Cities Index.
Water Supply Conditions Update

CleanPowerSF Sfpuc Commission
September 23, 2025

Document
Water Supply Conditions Update
Meeting
September 23, 2025
Body
CleanPowerSF Sfpuc Commission
Original file
2.0 MB
Text extracted from the CCA's file for reading and search. Open the original on sfpuc.sharefile.com. That file is the official record.

1 Water Supply Conditions Update
Steven R. Ritchie
Assistant General Manager, Water
September 15, 2025
September 15, 2025 Reservoir Storage
2 Reservoir
Current
Storage1,2,3
Maximum
Storage4
Available
Capacity
Percent of
Maximum
Storage
Normal
Percent of
Maximum
Storage5
(AF) (AF) (AF)
Tuolumne System
Hetch Hetchy 294,200 360,360 66,160 81.6% 83.6%
Cherry 243,900 273,345 29,445 89.2% -
Eleanor 20,090 27,100 7,010 74.1% -
Water Bank 570,000 570,000 0 100.0% 99.8%
Total Tuolumne Storage 1,128,190 1,230,805 102,615 91.7% - Local System
Calaveras 71,106 96,670 25,564 73.6% -
San Antonio 48,216 53,266 5,050 90.5% -
Crystal Springs 48,147 68,953 20,806 69.8% -
San Andreas 15,915 18,675 2,760 85.2% -
Pilarcitos 1,784 3,125 1,341 57.1% -
Total Local Storage 185,168 240,689 55,521 76.9% -
Total System Storage 1,313,358 1,471,494 158,136 89.3% 82.1% Total without water bank 743,358 901,494 158,136 82.5% -

Other
California
Reservoirs
3 California Drought Monitor
4 Hetch Hetchy Precipitation
5 Upcountry 6-station Precipitation Index as of
September 14, 2025
12-Month Median Total: 30.92 inches
Current Year Total: 29.11 inches
6 Annual Comparison:

Bay Area 7-station Precipitation Index
as of September 14, 2025
12-Month Median Total: 23.35 inches
Current Year Total: 22.80 inches
7 Annual Comparison:

Water Available to the City
8 Tuolumne River Water Available
to the City
9 Upcountry
Precipitation
Forecast
10 Bay Area
Precipitation
Forecast
11 Total Deliveries
12

← All documents from this meeting