Water Enterprise & Hetch Hetchy Water New Proposals
Division Proposal FY 2026‐27 FY 2027‐28 Page
Water Administration 466 Water Data Analyst 168,015 $ 212,676 $ 1‐2 Water Quality Division 452 Water System Regulatory Fees 186,871 $ 308,664 $ 3‐4 459 Transition temporary position to permanent FTE 248,285 $ 314,284 $ 5‐6 460 Hazard Assessment Program 471,550 $ 480,141 $ 7‐10 461 Transition 2 temporary positions to permanent FTE 389,526 $ 11‐12 886 Transition temporary position to permanent FTE ‐ ‐$ 13‐14 Water Supply & Treatment 572 SVWTP Ozone Facility ‐ Maintenance Engineering 246,446 $ 311,957 $ 15‐16 582 SVWTP Ozone Facility ‐ Maintenance 456,330 $ 555,418 $ 17‐20 559 SVWTP Ozone Facility ‐ System Operations 163,302 $ 206,263 $ 21‐24 Natural Resources & Land Management 684 New NRLM staffing proposal 315,015 $ 373,564 $ 25‐28 2,255,814 $ 3,152,493 $
Hetch Hetchy Water 302 Transition 5 temporary positions to permanent FTE ‐$ ‐$ 29‐32 388 HHW 1A ‐ Mandatory Payments 1,260,341 $ 2,566,795 $ 33‐36 1,260,341 $ 2,566,795 $
$ 3,516,155 $ 5,719,288
*FTE costs show preliminary estimates and do not include latest COLA assumptions due to timing Water and Hetch Hetchy Water Total
‐
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR01 Administration (232396)
Proposal: AUTO - 466 - Water Data Analyst
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232396/10000/10029994/0010 This will convert a Cat 18 1052 to permanent in the Hydrology and Water Systems (HAWS) group. HAWS provides watershed and water systems analyses for the Regional Water System and alternative supply project planning. HAWS’ water data management system requires continuous upgrades, improvements, and modernizations. The 1052 will manage upgrades, implement database optimizations, create training manuals/SOPs, and test new analytical tools to ensure the usability of the data by multiple divisions.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 116,677 5010 - Salaries 116,677
5130 - Fringe Benefits 519990 - Other Fringe Benefits 51,338 5130 - Fringe Benefits 51,338
Summary 168,015
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR01
Administration
(232396)
AN NEW - 1052_C - IS Business Analyst 0.79 168,015 This role has been filled by a temporary position. This will convert a Cat 18 1052 to permanent in the Hydrology and Water Systems (HAWS) group. HAWS provides watershed and water systems analyses for the Regional Water System and alternative supply project planning. HAWS’ water data management system requires continuous upgrades, improvements, and modernizations. The 1052 will manage upgrades, implement database optimizations, create training manuals/SOPs, and explore new analytical tools to ensure the usability of the data by multiple divisions.
Total 0.79 168,015
1 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR01 Administration (232396)
Proposal: AUTO - 466 - Water Data Analyst
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232396/10000/10029994/0010 This will convert a Cat 18 1052 to permanent in the Hydrology and Water Systems (HAWS) group. HAWS provides watershed and water systems analyses for the Regional Water System and alternative supply project planning. HAWS’ water data management system requires continuous upgrades, improvements, and modernizations. The 1052 will manage upgrades, implement database optimizations, create training manuals/SOPs, and test new analytical tools to ensure the usability of the data by multiple divisions.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 147,692 5010 - Salaries 147,692
5130 - Fringe Benefits 519990 - Other Fringe Benefits 64,984 5130 - Fringe Benefits 64,984
Summary 212,676
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR01
Administration
(232396)
AN NEW - 1052_C - IS Business Analyst 1.00 212,676 This role has been filled by a temporary position. This will convert a Cat 18 1052 to permanent in the Hydrology and Water Systems (HAWS) group. HAWS provides watershed and water systems analyses for the Regional Water System and alternative supply project planning. HAWS’ water data management system requires continuous upgrades, improvements, and modernizations. The 1052 will manage upgrades, implement database optimizations, create training manuals/SOPs, and explore new analytical tools to ensure the usability of the data by multiple divisions.
Total 1.00 212,676
2 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR0401 WQD Administration (232415)
Proposal: AUTO - 452 - Water System Regulatory Fees
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232415/10000/10029996/0004 SWRCB has increased the Water System Permit Fees assessed to the SFPUC by 82.8% over the past five years. WQD currently has $750,000 allocated in NPS to cover these fees (for the Regional Water System. Town of Sunol, Pleasanton Well Field, Moccasin, O'Shaunessy, Early Intake, Thomas Shaft, and CDD). Using the 5-year average increase (13%), we project that the fees will increase to $829,089 in FY26, $936,871 in FY27, and $1,058,664 in FY28. The SWRCB uses emergency rulemaking to adjust the rate of fees, usually within the same fiscal year that the fees are assessed, making forecasting difficult other than using a five-year average. Please see attached spreadsheet for breakdown.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 552000 - Taxes, Licenses & Permits-Bdgt 186,871 5210 - Non-Personnel Services 186,871
Summary 186,871
Non-Personnel Services
Organization Account Total
Request
Justification
WTR0401 WQD Administration (232415) 552000 - Taxes, Licenses & Permits-Bdgt 186,871 These funds will cover projected increases of Water System Permit Fees assessed by the SWRCB.
Non-Personnel Services Total 186,871
3 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR0401 WQD Administration (232415)
Proposal: AUTO - 452 - Water System Regulatory Fees
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232415/10000/10029996/0004 SWRCB has increased the Water System Permit Fees assessed to the SFPUC by 82.8% over the past five years. WQD currently has $750,000 allocated in NPS to cover these fees (for the Regional Water System. Town of Sunol, Pleasanton Well Field, Moccasin, O'Shaunessy, Early Intake, Thomas Shaft, and CDD). Using the 5-year average increase (13%), we project that the fees will increase to $829,089 in FY26, $936,871 in FY27, and $1,058,664 in FY28. The SWRCB uses emergency rulemaking to adjust the rate of fees, usually within the same fiscal year that the fees are assessed, making forecasting difficult other than using a five-year average. See attached spreadsheet for a breakdown.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 552000 - Taxes, Licenses & Permits-Bdgt 308,664 5210 - Non-Personnel Services 308,664
Summary 308,664
Non-Personnel Services
Organization Account Total
Request
Justification
WTR0401 WQD Administration (232415) 552000 - Taxes, Licenses & Permits-Bdgt 308,664 These funds are used to cover projected increases of Water System Permit Fees assessed by the SWRCB.
Non-Personnel Services Total 308,664
4 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR0403 WQD Envnmtl Services (232417)
Proposal: AUTO - 459 - Transition temporary position to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232417/10000/10029996/0004 WQD has three primary customs developed on-prem applications which are core to their business processes - namely Cross Connections Assembly Management System (CCAMS); Water Quality Sampling Manual (WQSM); and Backflow Assembly Tracking (BFAT). These 3 applications maintain their critical regulatory information about WQD operations, and they cannot afford any downtime to these apps. The strategy is two-fold: 1) reduce dependence on consulting partners and do the software maintenance/ enhancements with inhouse resources and then 2) to g radually move some of these custom applications to Commercial-off-the-shelf Software solutions (COTS) that can meet WQD business functionality and ITS requirements. WQD hired a CAT18 1044 Software Engineer in FY25 and within one year he has become well acquainted with application codes and has demonstrated IT expertise, ability to take responsibility, implement and deliver technical solutions resulting in significant cost savings. The potential cost savings is expected to further increase over the time. Du e to the recent influx of significant regulatory programs (Lead, Hazard Assessment, etc.) combined with the Water Enterprise’s revenue restraints, reliance on software solutions to achieve greater efficiency will only grow. Failure to approve this resource long-term will result in continued reliance on expensive consultants, greater staffing needs, and possibly regulatory violations.
WQD continues to be subjected to the risks of depending on consultants and that poses a serious risk to continuity of operations for WQD. Between custom software solutions and COTS solutions, there will be always enough maintenance, security patching, enhancements, and developing WQ dashboard applications (e.g., regulatory reports, LCRI monitoring, Lead sampling in schools and childcare facilities, Backflow tag management etc.), as well as integration work with other in-house SFPUC systems like Customer Care and Billing etc., that a permanent 1044 needs to be in place. WQ needs to have this critical full-time 1044 Principal IS Engineer dedicated programming resource to manage a large portfolio of their applications, analyze system data and make data-driven decisions while reducing reliance on vendors.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 172,420 5010 - Salaries 172,420
5130 - Fringe Benefits 519990 - Other Fringe Benefits 75,865 5130 - Fringe Benefits 75,865
Summary 248,285
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0403 WQD
Envnmtl Services
(232417)
AN NEW - 1044_C - IS Engineer-Principal 0.79 248,285 This role has been filled by a temporary position. Provide WQD with support for existing custom applications, applications in development, and transition to COTS applications by performing project management, product management, software maintenance, software engineering, and coordination with SFPUC IT. This position is critical for WQD to manage a large portfolio of applications internally, while reducing reliance on vendors and support from SFPUC-ITS.
Total 0.79 248,285
5 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR0403 WQD Envnmtl Services (232417)
Proposal: AUTO - 459 - Transition temporary position to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232417/10000/10029996/0004 WQD has three primary customs developed on-prem applications which are core to their business processes - namely Cross Connections Assembly Management System (CCAMS); Water Quality Sampling Manual (WQSM); and Backflow Assembly Tracking (BFAT). These 3 applications maintain their critical regulatory information about WQD operations, and they cannot afford any downtime to these apps. The strategy is two-fold: 1) reduce dependence on consulting partners and do the software maintenance/ enhancements with inhouse resources and then 2) to g radually move some of these custom applications to Commercial-off-the-shelf Software solutions (COTS) that can meet WQD business functionality and ITS requirements. WQD hired a CAT18 1044 Software Engineer in FY25 and within one year he has become well acquainted with application codes and has demonstrated IT expertise, ability to take responsibility, implement and deliver technical solutions resulting in significant cost savings. The potential cost savings is expected to further increase over the time. Du e to the recent influx of significant regulatory programs (Lead, Hazard Assessment, etc.) combined with the Water Enterprise’s revenue restraints, reliance on software solutions to achieve greater efficiency will only grow. Failure to approve this resource long-term will result in continued reliance on expensive consultants, greater staffing needs, and possibly regulatory violations.
WQD continues to be subjected to the risks of depending on consultants and that poses a serious risk to continuity of operations for WQD. Between custom software solutions and COTS solutions, there will be always enough maintenance, security patching, enhancements, and developing WQ dashboard applications (e.g., regulatory reports, LCRI monitoring, Lead sampling in schools and childcare facilities, Backflow tag management etc.), as well as integration work with other in-house SFPUC systems like Customer Care and Billing etc., that a permanent 1044 needs to be in place. WQ needs to have this critical full-time 1044 Principal IS Engineer dedicated programming resource to manage a large portfolio of their applications, analyze system data and make data-driven decisions while reducing reliance on vendors.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 218,253 5010 - Salaries 218,253
5130 - Fringe Benefits 519990 - Other Fringe Benefits 96,031 5130 - Fringe Benefits 96,031
Summary 314,284
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0403 WQD
Envnmtl Services
(232417)
AN NEW - 1044_C - IS Engineer-Principal 1.00 314,284 This role has been filled by a temporary position. Provide WQD with support for existing custom applications, applications in development, and transition to COTS applications by performing project management, product management, software maintenance, software engineering, and coordination with SFPUC IT. This position is critical for WQD to manage a large portfolio of applications internally, while reducing reliance on vendors and support from SFPUC-ITS.
Total 1.00 314,284
6 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR0403 WQD Envnmtl Services (232417)
Proposal: AUTO - 460 - Hazard Assessment Program
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232417/10000/10029996/0004 Under the State of California’s new cross-connection control regulations, the SFPUC must review all service connections to properties in San Francisco, as well as the eight other water systems under SFPUC’s control, to evaluate potential hazards to the public drinking water distribution system arising from activities on user premises. If user premises present a hazard to the public water system, the SFPUC must ensure that users install backflow protection. Compliance requires communication with customers, site visits by WQD Inspectors, and enforcement efforts when customers do not comply, all of which require significant staff and other resources. In addition, the new regulations require the installation of backflow prevention assemblies on about 4,200 fire service connections; these upgrades require significant effort by WQD, SFWD, and SFFD and coordination with customers. The new regulations also require upgrading backflow protection on temporary connections to fire hydrants for miscellaneous uses, such as construction. SFPUC has submitted a plan to the SWRCB with deadlines for completing hazard assessments by 2049, ensuring backflow prevention assemblies on all dedicated fire services by 2044, and upgrading temporary protection on hydrants by mid-2027. In addition, the field services section has increasing regulatory responsibilities for monitoring lead in schools and childcare centers and for constituents of emerging concern. Without the requested resources, hazards to the public water system and public health will not be addressed. SFPUC will not be able to meet its commitments to the SWRCB and thus will be in violation of state regulations.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 216,932 5010 - Salaries 216,932
5130 - Fringe Benefits 519990 - Other Fringe Benefits 95,449 5130 - Fringe Benefits 95,449
5600 - Equipment 560290 - Automotive & Other Vehicles 59,169 5600 - Equipment 59,169
5810 - Work Orders 581570 - GF-Chs-Medical Service 100,000 5810 - Work Orders 100,000
Summary 471,550
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0403 WQD
Envnmtl Services
(232417)
AN NEW - 0932_C - Manager IV 0.79 254,903 The 0932 will oversee implementation of SWRCB's new CCC requirements related to hazard assessments and upgrading backflow protection on fire service connections.
Program activities require monitoring of progress, staffing/resource needs and budgets, coordination with SFPUC Communications, SFPUC ITS, SFWD, SFFD, SFDBI, and consultants, conducting pilot studies, and public outreach to residential, commercial, industrial, and City customers.
WTR0403 WQD
Envnmtl Services
(232417)
AS 72040002 -
01100358
0933_C - Manager V 1.00 348,033 The 0933 will oversee the expanded ES/FS section: both subsections have grown to address new/complex drinking water regulations, including new management staff (0932). The 0933 must ensure that WQD complies with CCC requirements related to hazard assessments, upgrading backflow protection on fire service connections, and hydrant protection. Program activities must be incorporated into WQD's existing 7 of 36
operations and coordinated with SFDPH, SFDBI, SFWD, SFFD, customers, and private contractors.
WTR0403 WQD
Envnmtl Services
(232417)
AS 72040002 -
01100358
7204_C - Chief W
ater Service
Inspector
-1.00 -290,555 The 0933 will oversee the expanded ES/FS section: both subsections have grown to address new/complex drinking water regulations, including new management staff (0932). The 0933 must ensure that WQD complies with CCC requirements related to hazard assessments, upgrading backflow protection on fire service connections, and hydrant protection. Program activities must be incorporated into WQD's existing operations and coordinated with SFDPH, SFDBI, SFWD, SFFD, customers, and private contractors.
Total 0.79 312,381
Equipment
Organization Equipment No. Equipment
Ind
Item Title Quantity Base Total Accessories
Cost
Total
Request
Justification
WTR0403 WQD
Envnmtl Services
(232417)
PUC2027WE3191 N 72308 - 4a 1 59,169 0 59,169 Water Service Inspector will need vehicle to travel from Burlingame to SF to conduct site visits, investigations, coordination with SFWD, and meet with property owners.
Equipment Total 59,169 59,169
Work Orders
Organization Account Total
Request
Justification
WTR0403 WQD Envnmtl Services (232417) 581570 - GF-Chs-Medical Service 100,000 Work Order to DPH to fund a Hearing Officer to resolve disputes with property owners assessed fines for non-compliance with Cross Connection Control/Hazard Assessment requirements. Work order funds with DPH or other external City department required to remove conflict of interest.
Work Orders Total 100,000
8 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR0403 WQD Envnmtl Services (232417)
Proposal: AUTO - 460 - Hazard Assessment Program
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232417/10000/10029996/0004 Under the State of California’s new cross-connection control regulations, the SFPUC must review all service connections to properties in San Francisco, as well as the eight other water systems under SFPUC’s control, to evaluate potential hazards to the public drinking water distribution system arising from activities on user premises. If user premises present a hazard to the public water system, the SFPUC must ensure that users install backflow protection. Compliance requires communication with customers, site visits by WQD Inspectors, and enforcement efforts when customers do not comply, all of which require significant staff and other resources. In addition, the new regulations require the installation of backflow prevention assemblies on about 4,200 fire service connections; these upgrades require significant effort by WQD, SFWD, and SFFD and coordination with customers. The new regulations also require upgrading backflow protection on temporary connections to fire hydrants for miscellaneous uses, such as construction. SFPUC has submitted a plan to the SWRCB with deadlines for completing hazard assessments by 2049, ensuring backflow prevention assemblies on all dedicated fire services by 2044, and upgrading temporary protection on hydrants by mid-2027. In addition, the field services section has increasing regulatory responsibilities for monitoring lead in schools and childcare centers and for constituents of emerging concern. Without the requested resources, hazards to the public water system and public health will not be addressed. SFPUC will not be able to meet its commitments to the SWRCB and thus will be in violation of state regulations.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 263,987 5010 - Salaries 263,987
5130 - Fringe Benefits 519990 - Other Fringe Benefits 116,154 5130 - Fringe Benefits 116,154
5810 - Work Orders 581570 - GF-Chs-Medical Service 100,000 5810 - Work Orders 100,000
Summary 480,141
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0403 WQD
Envnmtl Services
(232417)
AN NEW - 0932_C - Manager IV 1.00 322,662 The 0932 will oversee implementation of SWRCB's new CCC requirements related to hazard assessments and upgrading backflow protection on fire service connections.
Program activities require monitoring of progress, staffing/resource needs and budgets, coordination with SFPUC Communications, SFPUC ITS, SFWD, SFFD, SFDBI, and consultants, conducting pilot studies, and public outreach to residential, commercial, industrial, and City customers.
WTR0403 WQD
Envnmtl Services
(232417)
AS 72040002 -
01100358
0933_C - Manager V 1.00 348,034 The 0933 will oversee the expanded ES/FS section: both subsections have grown to address new/complex drinking water regulations, including new management staff (0932). The 0933 must ensure that WQD complies with CCC requirements related to hazard assessments, upgrading backflow protection on fire service connections, and hydrant protection. Program activities must be incorporated into WQD's existing operations and coordinated with SFDPH, SFDBI, SFWD, SFFD, customers, and private contractors.
WTR0403 WQD
Envnmtl Services
(232417)
AS 72040002 -
01100358
7204_C - Chief Water Service
Inspector
-1.00 -290,555 The 0933 will oversee the expanded ES/FS section: both subsections have grown to address new/complex drinking water regulations, including new management staff (0932). The 0933 must ensure that WQD complies with CCC requirements related to 9 of 36
hazard assessments, upgrading backflow protection on fire service connections, and hydrant protection. Program activities must be incorporated into WQD's existing operations and coordinated with SFDPH, SFDBI, SFWD, SFFD, customers, and private contractors.
Total 1.00 380,141
Work Orders
Organization Account Total
Request
Justification
WTR0403 WQD Envnmtl Services (232417) 581570 - GF-Chs-Medical Service 100,000 Work Order to DPH to fund a Hearing Officer to resolve disputes with property owners assessed fines for non-compliance with Cross Connection Control/Hazard Assessment requirements. Work order funds with DPH or other external City department required to remove conflict of interest.
Work Orders Total 100,000
10 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR0404 WQD Labs (232418)
Proposal: AUTO - 461 - Transition 2 temporary positions to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232418/10000/10029996/0004 "Two Cat-18 positions (2486 and 2482) were hired to support the Recycled Water Program. The Recycled Water Program startup has been de layed but is expected to occur by FY27. This request is to make these positions permanent. This request can be budgeted for year 2.
This proposal requests approval to establish one (1) PCS 2486 Chemist position and one (1) PCS 2482 Water Quality Technician III to support the start-up and ongoing operations of the newly constructed and soon to be commissioned Westside Recycled Water Treatment Facility (Facility). The positions are essential to meeting regulatory requirements under the California Recycled Water Regulations and the National Pollutant Discharge Elimination System (NPDES) permit and ensuring the Facility’s operational readiness and protection of public and environmental health." Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 225,306 5010 - Salaries 225,306
5130 - Fringe Benefits 519990 - Other Fringe Benefits 99,134 5130 - Fringe Benefits 99,134
5600 - Equipment 560290 - Automotive & Other Vehicles 65,086 5600 - Equipment 65,086
Summary 389,526
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0404 WQD
Labs (232418)
AN NEW - 2486_C - Chemist 0.79 170,136 The Chemist will perform a wide range of analytical functions, including testing of wastewater and recycled water compliance samples related to the new recycled water system and ensuring all work complies with California Environmental Accreditation Program Regulations. The Chemist also manages data reporting/upload through the Laboratory Information Management System, support quality assurance processes, and provide critical data for operational decision-making ensuring regulatory compliance.
WTR0404 WQD
Labs (232418)
AN NEW - 2482_C - Water Quality Technician
III
0.79 154,304 The Water Quality Technician III is needed to coordinate additional sample collection/field tests, staff training, and compliance reporting. A lead technician is needed to integrate the additional reporting criteria and procedures into existing sample scheduling and record management systems and ensure effective coordination with operations, project/program, and laboratory staff. Accurate and timely data for operational decision-making is essential to ensuring regulatory compliance.
Total 1.58 324,440
11 of 36
Equipment
Organization Equipment No. Equipment
Ind
Item Title Quantity Base Total Accessories
Cost
Total
Request
Justification
WTR0404 WQD
Labs (232418)
PUC2028WE3197 N 72308 - 4a 1 65,086 0 65,086 2482 Water Quality Technician III will need a vehicle to travel from Burlingame to sample sites in SF and transport samples to Laboratory in Millbrae Equipment Total 65,086 65,086
12 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR0405 WQD Capital Programs (232419)
Proposal: AUTO - 886 - Transition temporary position to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232419/10000/10029996/0004 This request seeks to convert the current 5207 (CAT18) Associate Engineer from a three-year temporary position to a permanent civil service (PCS) role. Permanent staffing is essential to secure decade-long program continuity, retain specialized expertise, and ensure compliance with evolving public health regulations governing the Regional Cross-Connection Controls Program.
The Regional Cross-Connection Controls Program is funded and scheduled through 2036, with two major components: an ongoing $18.6M project and a new $26.3M project beginning in FY 2028. • Regional Cross Connection Controls Project ($18.6M): An in-house project jointly managed by WQD and WSTD, this effort upgrades critical appurtenances in the Regional Water System (RWS) including air vacuum valves (AVVs), air release valves (ARVs), and blowoff valves (BOs) to align with the latest public health protection standards. Delivering this project requires utility surveys, property owner engagement, and mitigation planning for converting bottom blowoffs (BBOs) to top blowoffs (TBOs). The BBO-to-TBO conversion scope was added in early 2025 due to operations’ priority to upgrade aging assets, improve access for dewatering, and address cross-connection potentials all while maintaining alignment with the long-term pipeline inspection cycle. The Associate Engineer provides essential project management by conducting field inspections, preparing traffic control plans, documenting non-conformances, coordinating corrective actions, verifying completion, and maintaining compliance records.
• Underground Air Valve with ROW Needs Project ($26.3M): Scheduled to start in FY2028, this project will address 43 unforeseen appurtenance sites beneath public roadways. The work involves securing permits from multiple jurisdictions, trenching within public streets, relocating appurtenances, acquiring permanent easements on private property, and coordination with the SFPUC Real Estate Division and City Attorney’s Office for permits and easements. The complexity of this project will require sustained interagency coordination and stakeholder engagement.
The scope of the program may expand and extend beyond 2036 as state regulations and operation’s priority evolve. To deliver these long-term projects effectively, uninterrupted staffing is critical.
Converting the Associate Engineer position to PCS will:
• Secure a permanent budget allocation,
• Reduce turnover risk, and
• Retain the specialized expertise needed to support decade-long projects.
The Associate Engineer role is highly technical, requiring advanced knowledge of environmental and sanitary engineering principles and application of standards from the EPA, American Waterworks Association, and National Sanitation Federation. Duties include developing scopes, budgets, and schedules; monitoring timelines; coordinating with contractors; verifying deliverables; reviewing quality assurance; preparing reports; and supporting operational activities post-construction.
Permanent staffing will strengthen program delivery, ensure regulatory compliance, and protect public health through rigorous cross-connection control measures.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 0
5010 - Salaries 0
Summary 0
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0405 WQD
Capital Programs
(232419)
ON NEW - 5207_C - Associate Engineer 0.79 0 This role has been filled by a temporary position. The Associate Engineer plays a central role in managing tasks required to successfully complete these projects, including conducting field inspections, preparing traffic control plans, documenting non-conformances, coordinating corrective actions, verifying completion, managing budgets, and maintaining compliance records
Total 0.79 0
13 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR0405 WQD Capital Programs (232419)
Proposal: AUTO - 886 - Transition temporary position to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232419/10000/10029996/0004 This request seeks to convert the current 5207 (CAT18) Associate Engineer from a three-year temporary position to a permanent civil service (PCS) role. Permanent staffing is essential to secure decade-long program continuity, retain specialized expertise, and ensure compliance with evolving public health regulations governing the Regional Cross-Connection Controls Program.
The Regional Cross-Connection Controls Program is funded and scheduled through 2036, with two major components: an ongoing $18.6M project and a new $26.3M project beginning in FY 2028. • Regional Cross Connection Controls Project ($18.6M): An in-house project jointly managed by WQD and WSTD, this effort upgrades critical appurtenances in the Regional Water System (RWS) including air vacuum valves (AVVs), air release valves (ARVs), and blowoff valves (BOs) to align with the latest public health protection standards. Delivering this project requires utility surveys, property owner engagement, and mitigation planning for converting bottom blowoffs (BBOs) to top blowoffs (TBOs). The BBO-to-TBO conversion scope was added in early 2025 due to operations’ priority to upgrade aging assets, improve access for dewatering, and address cross-connection potentials all while maintaining alignment with the long-term pipeline inspection cycle. The Associate Engineer provides essential project management by conducting field inspections, preparing traffic control plans, documenting non-conformances, coordinating corrective actions, verifying completion, and maintaining compliance records.
• Underground Air Valve with ROW Needs Project ($26.3M): Scheduled to start in FY2028, this project will address 43 unforeseen appurtenance sites beneath public roadways. The work involves securing permits from multiple jurisdictions, trenching within public streets, relocating appurtenances, acquiring permanent easements on private property, and coordination with the SFPUC Real Estate Division and City Attorney’s Office for permits and easements. The complexity of this project will require sustained interagency coordination and stakeholder engagement.
The scope of the program may expand and extend beyond 2036 as state regulations and operation’s priority evolve. To deliver these long-term projects effectively, uninterrupted staffing is critical.
Converting the Associate Engineer position to PCS will:
• Secure a permanent budget allocation,
• Reduce turnover risk, and
• Retain the specialized expertise needed to support decade-long projects.
The Associate Engineer role is highly technical, requiring advanced knowledge of environmental and sanitary engineering principles and application of standards from the EPA, American Waterworks Association, and National Sanitation Federation. Duties include developing scopes, budgets, and schedules; monitoring timelines; coordinating with contractors; verifying deliverables; reviewing quality assurance; preparing reports; and supporting operational activities post-construction.
Permanent staffing will strengthen program delivery, ensure regulatory compliance, and protect public health through rigorous cross-connection control measures.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 0
5010 - Salaries 0
Summary 0
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0405 WQD
Capital Programs
(232419)
ON NEW - 5207_C - Associate Engineer 1.00 0 This role has been filled by a temporary position. The Associate Engineer plays a central role in managing tasks required to successfully complete these projects, including conducting field inspections, preparing traffic control plans, documenting non-conformances, coordinating corrective actions, verifying completion, managing budgets, and maintaining compliance records
Total 1.00 0
14 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR0503 WST Maint Engr (232423)
Proposal: AUTO - 572 - SVWTP Ozone Facility
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232423/10000/10029997/0002 In recent years, the San Francisco Public Utilities Commission’s Sunol Valley Water Treatment Plant (SVWTP) has experienced more frequent taste and odor (T&O) events from seasonal algal blooms than had occurred historically. Algae blooms can occur at any time, but large blooms tend to occur in the Spring and Fall due to nutrient availability, temperature, and sunlight. The SVWTP Ozone project’s objective is to install ozone treatment facilities as a long-term solution to control T&O events encountered in the raw water supply from both the San Antonio and Calaveras Reservoir sources.
The project will improve the SFPUC’s ability to reliably meet water quality goals, especially during warm months and during Hetch Hetchy shutdowns. The driver for the current project is a response to changing conditions in the local reservoirs. At the same time, there will be secondary benefits including disinfection redundancy and reduction of disinfection byproducts, color, and emerging contaminants. This s a $326.4M dollar capital project, with a forecast completion in March 2030.
WSTD estimates that 15 new positions will be needed to operate and maintain this new facility post construction. 6 of 15 positions are being requested in this operating budget request (FY27 and FY28).
Four positions are new, and two will be reassigned and repurposed. These positions only pertain to the startup/commissioning and operations of the facility and do not address the maintenance requirements:
o 1 of 2 - 7341 Water Treatment Operators
o 1 of 2- 7345 Electricians
o 1 of 2- 7318 Electronic Maintenance Technicians
o 1 - 7332 Maintenance Machinist
o
1- 7347 P
lumber
o 1 - 5241 Mechanical Engineer
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 171,143 5010 - Salaries 171,143
5130 - Fringe Benefits 519990 - Other Fringe Benefits 75,303 5130 - Fringe Benefits 75,303
Summary 246,446
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0503 WST
Maint Engr
(232423)
AN NEW - 5241_C - Engineer 0.79 246,446 A 5241 – Mechanical Engineer is necessary to provide the required maintenance for the various valves, actuators, and pumps associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility. Current engineering staffing levels cannot support the start-up, commissioning, and maintenance of this new and critical asset used for water treatment.
Total 0.79 246,446
15 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR0503 WST Maint Engr (232423)
Proposal: AUTO - 572 - SVWTP Ozone Facility
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232423/10000/10029997/0002 In recent years, the San Francisco Public Utilities Commission’s Sunol Valley Water Treatment Plant (SVWTP) has experienced more frequent taste and odor (T&O) events from seasonal algal blooms than had occurred historically. Algae blooms can occur at any time, but large blooms tend to occur in the Spring and Fall due to nutrient availability, temperature, and sunlight. The SVWTP Ozone project’s objective is to install ozone treatment facilities as a long-term solution to control T&O events encountered in the raw water supply from both the San Antonio and Calaveras Reservoir sources.
The project will improve the SFPUC’s ability to reliably meet water quality goals, especially during warm months and during Hetch Hetchy shutdowns. The driver for the current project is a response to changing conditions in the local reservoirs. At the same time, there will be secondary benefits including disinfection redundancy and reduction of disinfection byproducts, color, and emerging contaminants. This s a $326.4M dollar capital project, with a forecast completion in March 2030.
WSTD estimates that 15 new positions will be needed to operate and maintain this new facility post construction. 6 of 15 positions are being requested in this operating budget request (FY27 and FY28).
Four positions are new, and two will be reassigned and repurposed. These positions only pertain to the startup/commissioning and operations of the facility and do not address the maintenance requirements:
o 1 of 2 - 7341 Water Treatment Operators
o 1 of 2- 7345 Electricians
o 1 of 2- 7318 Electronic Maintenance Technicians
o 1 - 7332 Maintenance Machinist
o 1- 7347 P
lum
ber
o 1 - 5241 Mechanical Engineer
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 216,637 5010 - Salaries 216,637
5130 - Fringe Benefits 519990 - Other Fringe Benefits 95,320 5130 - Fringe Benefits 95,320
Summary 311,957
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0503 WST
Maint Engr
(232423)
AN NEW - 5241_C - Engineer 1.00 311,957 A 5241 – Mechanical Engineer is necessary to provide the required maintenance for the various valves, actuators, and pumps associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility. Current engineering staffing levels cannot support the start-up, commissioning, and maintenance of this new and critical asset used for water treatment.
Total 1.00 311,957
16 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR0504 WST Maintenance (232424)
Proposal: AUTO - 582 - SVWTP Ozone Facility
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232424/10000/10029997/0020 In recent years, the San Francisco Public Utilities Commission’s Sunol Valley Water Treatment Plant (SVWTP) has experienced more frequent taste and odor (T&O) events from seasonal algal blooms than had occurred historically. Algae blooms can occur at any time, but large blooms tend to occur in the Spring and Fall due to nutrient availability, temperature, and sunlight. The SVWTP Ozone project’s objective is to install ozone treatment facilities as a long-term solution to control T&O events encountered in the raw water supply from both the San Antonio and Calaveras Reservoir sources.
The project will improve the SFPUC’s ability to reliably meet water quality goals, especially during warm months and during Hetch Hetchy shutdowns. The driver for the current project is a response to changing conditions in the local reservoirs. At the same time, there will be secondary benefits including disinfection redundancy and reduction of disinfection byproducts, color, and emerging contaminants. This s a $326.4M dollar capital project, with a forecast completion in March 2030.
WSTD estimates that 15 new positions will be needed to operate and maintain this new facility post construction. 6 of 15 positions are being requested in this operating budget request (FY27 and FY28).
Four positions are new, and two will be reassigned and repurposed. These positions only pertain to the startup/commissioning and operations of the facility and do not address the maintenance requirements:
o 1 of 2 - 7341 Water Treatment Operators
o 1 of 2- 7345 Electricians
o 1 of 2- 7318 Electronic Maintenance Technicians
o 1 - 7332 Maintenance Machinist
o
1- 7347 P
lumber
o 1 - 5241 Mechanical Engineer
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 316,896 5010 - Salaries 316,896
5130 - Fringe Benefits 519990 - Other Fringe Benefits 139,434 5130 - Fringe Benefits 139,434
Summary 456,330
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0504 WST
Maintenance
(232424)
AN NEW - 7318_C - Electronic Maintenance
Technician
0.79 194,613 A 7318 - Electronics Maintenance Technician is necessary to provide the required preventative and corrective maintenance for the various electrical components and analyzers associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility. Current EMT staffing levels cannot support the maintenance of this critical facility used for water treatment.
WTR0504 WST
Maintenance
(232424)
AS 75140031 -
01091515
7345_C - Electrician 1.00 223,698 A 7345 - Electrician is necessary to provide the required preventative and corrective maintenance for the various electrical components associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment 17 of 36
Facility. Current Electrician staffing levels cannot support the maintenance of this critical facility used for water treatment.
WT
R0504 WST
Maintenance
(232424)
AS 75140031 -
01091515
7514_C - G
eneral Laborer -1.00 -140,126 A 7345 - Electrician is necessary to provide the required preventative and corrective maintenance for the various electrical components associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility. Current Electrician staffing levels cannot support the maintenance of this critical facility used for water treatment.
WTR0504 WST
Maintenance
(232424)
AN NEW - 7347_C - Plumber 0.79 178,145 A 7347 - House Plumber is necessary to provide the required preventative and corrective maintenance for the various chemical feed lines and chemical tanks associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility.
Total 1.58 456,330
18 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR0504 WST Maintenance (232424)
Proposal: AUTO - 582 - SVWTP Ozone Facility
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232424/10000/10029997/0020 In recent years, the San Francisco Public Utilities Commission’s Sunol Valley Water Treatment Plant (SVWTP) has experienced more frequent taste and odor (T&O) events from seasonal algal blooms than had occurred historically. Algae blooms can occur at any time, but large blooms tend to occur in the Spring and Fall due to nutrient availability, temperature, and sunlight. The SVWTP Ozone project’s objective is to install ozone treatment facilities as a long-term solution to control T&O events encountered in the raw water supply from both the San Antonio and Calaveras Reservoir sources.
The project will improve the SFPUC’s ability to reliably meet water quality goals, especially during warm months and during Hetch Hetchy shutdowns. The driver for the current project is a response to changing conditions in the local reservoirs. At the same time, there will be secondary benefits including disinfection redundancy and reduction of disinfection byproducts, color, and emerging contaminants. This s a $326.4M dollar capital project, with a forecast completion in March 2030.
WSTD estimates that 15 new positions will be needed to operate and maintain this new facility post construction. 6 of 15 positions are being requested in this operating budget request (FY27 and FY28).
Four positions are new, and two will be reassigned and repurposed. These positions only pertain to the startup/commissioning and operations of the facility and do not address the maintenance requirements:
o 1 of 2 - 7341 Water Treatment Operators
o 1 of 2- 7345 Electricians
o 1 of 2- 7318 Electronic Maintenance Technicians
o 1 - 7332 Maintenance Machinist
o 1- 7347 Plumber
o 1 - 5241 Mechanical Engineer
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 385,707 5010 - Salaries 385,707
5130 - Fringe Benefits 519990 - Other Fringe Benefits 169,711 5130 - Fringe Benefits 169,711
Summary 555,418
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0504 WST
Maintenance
(232424)
AN NEW - 7318_C - Electronic Maintenance
Technician
1.00 246,345 A 7318 - Electronics Maintenance Technician is necessary to provide the required preventative and corrective maintenance for the various electrical components and analyzers associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility. Current EMT staffing levels cannot support the maintenance of this critical facility used for water treatment.
WTR0504 WST
Maintenance
(232424)
AS 75140031 -
01091515
7345_C - Electrician 1.00 223,698 A 7345 - Electrician is necessary to provide the required preventative and corrective maintenance for the various electrical components associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment 19 of 36
Facility. Current Electrician staffing levels cannot support the maintenance of this critical facility used for water treatment.
WT
R0504 WST
Maintenance
(232424)
AS 75140031 -
01091515
7514_C - G
eneral Laborer -1.00 -140,126 A 7345 - Electrician is necessary to provide the required preventative and corrective maintenance for the various electrical components associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility. Current Electrician staffing levels cannot support the maintenance of this critical facility used for water treatment.
WTR0504 WST
Maintenance
(232424)
AN NEW - 7347_C - Plumber 225,501 A 7347 - House Plumber is necessary to provide the required preventative and corrective maintenance for the various chemical feed lines and chemical tanks associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility.
Total 2.00 555,418
20 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR0505 WST Systems Ops (232425)
Proposal: AUTO - 559 - SVWTP Ozone Facility
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232425/10000/10029996/0004 In recent years, the San Francisco Public Utilities Commission’s Sunol Valley Water Treatment Plant (SVWTP) has experienced more frequent taste and odor (T&O) events from seasonal algal blooms than had occurred historically. Algae blooms can occur at any time, but large blooms tend to occur in the Spring and Fall due to nutrient availability, temperature, and sunlight. The SVWTP Ozone project’s objective is to install ozone treatment facilities as a long-term solution to control T&O events encountered in the raw water supply from both the San Antonio and Calaveras Reservoir sources.
The project will improve the SFPUC’s ability to reliably meet water quality goals, especially during warm months and during Hetch Hetchy shutdowns. The driver for the current project is a response to changing conditions in the local reservoirs. At the same time, there will be secondary benefits including disinfection redundancy and reduction of disinfection byproducts, color, and emerging contaminants. This s a $326.4M dollar capital project, with a forecast completion in March 2030.
WSTD estimates that 15 new positions will be needed to operate and maintain this new facility post construction. 6 of 15 positions are being requested in this operating budget request (FY27 and FY28).
Four positions are new, and two will be reassigned and repurposed. These positions only pertain to the startup/commissioning and operations of the facility and do not address the maintenance requirements:
o 1 of 2 - 7341 Water Treatment Operators
o 1 of 2- 7345 Electricians
o 1 of 2- 7318 Electronic Maintenance Technicians
o 1 - 7332 Maintenance Machinist
o 1- 7347 Plumber
o 1 - 5241 Mechanical Engineer
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 113,404 5010 - Salaries 113,404
5130 - Fringe Benefits 519990 - Other Fringe Benefits 49,898 5130 - Fringe Benefits 49,898
Summary 163,302
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0505 WST
Systems Ops
(232425)
AN NEW - 7332_C - Maintenance Machinist 0.79 161,618 A 7332 - Maintenance Machinist is necessary to provide the required maintenance for the various valves, actuators, and pumps associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility. Current machinist staffing levels cannot support the maintenance of this new and critical asset used for water treatment.
WTR0505 WST
Systems Ops
(232425)
AS 73320018 -
01003667
7332_C - Maintenance Machinist -1.00 -204,579 Additional 7341 - Water Treatment Operator staff is necessary to operate and maintain the new ozonation facility at the Sunol Valley Water Treatment Plant.
Current operator staffing levels are limited and do not have the capacity to properly operate and maintain this critical asset used for water treatment.
WTR0505 WST
Systems Ops
AS 73320018 -
01003667
7341_C - Stationary Engineer,
Water Treatment Plant
1.00 206,263 Additional 7341 - Water Treatment Operator staff is necessary to operate and maintain the new ozonation facility at the Sunol Valley Water Treatment Plant. 21 of 36
(232425) Current operator staffing levels are limited and do not have the capacity to properly operate and maintain this critical asset used for water treatment.
Total 0.79 163,302
22 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR0505 WST Systems Ops (232425)
Proposal: AUTO - 559 - SVWTP Ozone Facility
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/232425/10000/10029996/0004 In recent years, the San Francisco Public Utilities Commission’s Sunol Valley Water Treatment Plant (SVWTP) has experienced more frequent taste and odor (T&O) events from seasonal algal blooms than had occurred historically. Algae blooms can occur at any time, but large blooms tend to occur in the Spring and Fall due to nutrient availability, temperature, and sunlight. The SVWTP Ozone project’s objective is to install ozone treatment facilities as a long-term solution to control T&O events encountered in the raw water supply from both the San Antonio and Calaveras Reservoir sources.
The project will improve the SFPUC’s ability to reliably meet water quality goals, especially during warm months and during Hetch Hetchy shutdowns. The driver for the current project is a response to changing conditions in the local reservoirs. At the same time, there will be secondary benefits including disinfection redundancy and reduction of disinfection byproducts, color, and emerging contaminants. This s a $326.4M dollar capital project, with a forecast completion in March 2030.
WSTD estimates that 15 new positions will be needed to operate and maintain this new facility post construction. 6 of 15 positions are being requested in this operating budget request (FY27 and FY28).
Four positions are new, and two will be reassigned and repurposed. These positions only pertain to the startup/commissioning and operations of the facility and do not address the maintenance requirements:
o 1 of 2 - 7341 Water Treatment Operators
o 1 of 2- 7345 Electricians
o 1 of 2- 7318 Electronic Maintenance Technicians
o 1 - 7332 Maintenance Machinist
o 1- 7347 Plumber
o 1 - 5241 Mechanical Engineer
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 143,238 5010 - Salaries 143,238
5130 - Fringe Benefits 519990 - Other Fringe Benefits 63,025 5130 - Fringe Benefits 63,025
Summary 206,263
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR0505 WST
Systems Ops
(232425)
AN NEW - 7332_C - Maintenance Machinist 1.00 204,579 A 7332 - Maintenance Machinist is necessary to provide the required maintenance for the various valves, actuators, and pumps associated with the new ozonation facility that is currently in construction at the Sunol Valley Water Treatment Facility. Current machinist staffing levels cannot support the maintenance of this new and critical asset used for water treatment.
WTR0505 WST
Systems Ops
(232425)
AS 73320018 -
01003667
7332_C - Maintenance Machinist -1.00 -204,579 Additional 7341 - Water Treatment Operator staff is necessary to operate and maintain the new ozonation facility at the Sunol Valley Water Treatment Plant.
Current operator staffing levels are limited and do not have the capacity to properly operate and maintain this critical asset used for water treatment.
WTR0505 WST
Systems Ops
AS 73320018 -
01003667
7341_C - Stationary Engineer,
Water Treatment Plant
1.00 206,263 Additional 7341 - Water Treatment Operator staff is necessary to operate and maintain the new ozonation facility at the Sunol Valley Water Treatment Plant. 23 of 36
(232425) Current operator staffing levels are limited and do not have the capacity to properly operate and maintain this critical asset used for water treatment.
Total 1.00 206,263
24 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WTR06 Natural Resources (292656)
Proposal: AUTO - 684 - New NRLM staffing proposal
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/292656/10000/10029995/0036 New proposal to add two (2) new positions:
1) Asset Management Senior Engineer. Currently borrowed from CDD and will go off-budget. This new position will oversee contractors implementing watershed infrastructure maintenance projects such as culvert replacements, road maintenance, and stock pond embankment repairs. 2) Tuolumne River Environmental Science Manager. This new position will oversee the SFPUC environmental stewardship efforts related to the Tuolumne River. This work includes managing the multi- agency Upper River Workgroup and Lower River requirements and investments in coordination with the Turlock and Modesto Irrigation Districts.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 218,761 5010 - Salaries 218,761
5130 - Fringe Benefits 519990 - Other Fringe Benefits 96,254 5130 - Fringe Benefits 96,254
Summary 315,015
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR06 Natural
Resources
(292656)
ON NEW - 5211_C - Engineer/Architect/Landscape
Architect Senior
0.79 0 This new position will oversee contractors implementing watershed infrastructure maintenance projects such as culvert replacements, road maintenance, and stock pond embankment repairs. Under the direction of the NRLM Division Manager and in coordination with watershed staff, this position will develop project designs, draft scopes of work for bid packages, oversee contractors, review invoices, perform site inspections, and work with asset planners to plan future work and associated budgets.
WTR06 Natural
Resources
(292656)
AN NEW - 0923_C - Manager II 0.79 220,261 This new position will oversee the SFPUC environmental stewardship efforts related to the Tuolumne River. This work includes managing the multi-agency Upper River Workgroup (in coordination with the Yosemite National Park Service and Stanislaus National Forest) and Lower River requirements and investments in coordination with the Turlock and Modesto Irrigation Districts, including SFPUC’s contribution to the District’s FERC license for Don Pedro Dam and the Healthy Rivers and Landscapes effort.
WTR06 Natural
Resources
(292656)
AS 09310027 -
01108596
0931_C - Manager III -1.00 -300,657 This substitution is to address an internal equity issue and to recognize growth and change of the current position within the division.
WTR06 Natural
Resources
(292656)
AS 09310027 -
01108596
0933_C - Manager V 1.00 348,034 This substitution is to address an internal equity issue and to recognize growth and change of the current position within the division.
WTR06 Natural
Resources
AS 09310028 -
01114968
0931_C - Manager III -1.00 -300,657 This substitution is to address an internal equity issue and to recognize growth and change of the current position within the division. 25 of 36
(292656)
WTR06 Natural
Resources
(292656)
AS 09310028 -
01114968
0933_C - Manager V 1.00 348,034 This substitution is to address an internal equity issue and to recognize growth and change of the current position within the division.
Total 1.58 315,015
26 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WTR06 Natural Resources (292656)
Proposal: AUTO - 684 - New NRLM staffing proposal
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 25940/292656/10000/10029995/0036 New proposal to add two (2) new positions:
1) Asset Management Senior Engineer. Currently borrowed from CDD and will go off-budget. This new position will oversee contractors implementing watershed infrastructure maintenance projects such as culvert replacements, road maintenance, and stock pond embankment repairs. 2) Tuolumne River Environmental Science Manager. This new position will oversee the SFPUC environmental stewardship efforts related to the Tuolumne River. This work includes managing the multi- agency Upper River Workgroup and Lower River requirements and investments in coordination with the Turlock and Modesto Irrigation Districts.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 259,420 5010 - Salaries 259,420
5130 - Fringe Benefits 519990 - Other Fringe Benefits 114,144 5130 - Fringe Benefits 114,144
Summary 373,564
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WTR06 Natural
Resources
(292656)
ON NEW - 5211_C - Engineer/Architect/Landscape
Architect Senior
1.00 0 This new position will oversee contractors implementing watershed infrastructure maintenance projects such as culvert replacements, road maintenance, and stock pond embankment repairs. Under the direction of the NRLM Division Manager and in coordination with watershed staff, this position will develop project designs, draft scopes of work for bid packages, oversee contractors, review invoices, perform site inspections, and work with asset planners to plan future work and associated budgets.
WTR06 Natural
Resources
(292656)
AN NEW - 0923_C - Manager II 1.00 278,810 This new position will oversee the SFPUC environmental stewardship efforts related to the Tuolumne River. This work includes managing the multi-agency Upper River Workgroup (in coordination with the Yosemite National Park Service and Stanislaus National Forest) and Lower River requirements and investments in coordination with the Turlock and Modesto Irrigation Districts, including SFPUC’s contribution to the District’s FERC license for Don Pedro Dam and the Healthy Rivers and Landscapes effort.
WTR06 Natural
Resources
(292656)
AS 09310027 -
01108596
0931_C - Manager III -1.00 -300,657 This substitution is to address an internal equity issue and to recognize growth and change of the current position within the division.
WTR06 Natural
Resources
(292656)
AS 09310027 -
01108596
0933_C - Manager V 1.00 348,034 This substitution is to address an internal equity issue and to recognize growth and change of the current position within the division.
WTR06 Natural
Resources
AS 0931_C - Manager III -1.00 -300,657 This substitution is to address an internal equity issue and to recognize growth and change of the current position within the division. 27 of 36
(292656)
WTR06 Natural
Resources
(292656)
AS 09310028 -
01114968
0933_C - Manager V 1.00 348,034 This substitution is to address an internal equity issue and to recognize growth and change of the current position within the division.
Total 2.00 373,564
28 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: HHP10 Hetchy Water (298646)
Proposal: AUTO - 302 - Transition 5 temporary positions to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 24970/298646/10000/10029992/0014 HHW is requesting conversion of Cat 18 positions to reflect that these positions are performing a permanent function. HHW manages a $15 billion portfolio of assets, many of which are beyond their useful lives. Temporary positions have been added to address both new and ongoing maintenance for the 100-year-old system. Conversion of these positions from Temp to Perm, will provide for the stability of these positions, and for ongoing maintenance of the Hetch Hetchy Water and Power system.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 649,042 5010 - Salaries 59993M - Attrition Savings (649,042)
5010 - Salaries 0
5130 - Fringe Benefits 519990 - Other Fringe Benefits 0 5130 - Fringe Benefits 0
Summary 0
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
HHP10 Hetchy
Water (298646)
AN NEW - 5601_C - Utility Analyst 0.79 153,101 This role has been filled by a temporary position. Hetch Hetchy Water (HHW) manages a $15 billion asset portfolio comprised of over 12,000 asset records. These asset records are maintained by the HHW Planning Section and are critical to the operation and maintenance of water and power systems. To ensure the HHW Planning Section can keep pace with this growth, maintain accurate asset records, and continue to develop effective maintenance strategies, a temporary to permanent conversion of a 5601 position is requested.
HHP10 Hetchy
Water (298646)
AN NEW - 7318_C - Electronic Maintenance
Technician
0.79 194,613 This role has been filled by a temporary position. Temporary to permanent position conversion is requested for ongoing maintenance projects for the 100-year-old HHWP System, including integration of new assets. The position performs a wide variety of highly skilled technical work including troubleshooting, maintenance, testing, repair, calibration, fabrication, installation and modification of electronic equipment and related control system components of powerhouses, power transmission and distribution systems.
HHP10 Hetchy
Water (298646)
AN NEW - 7344_C - Carpenter 0.79 153,098 This role has been filled by a temporary position. Temporary to permanent position conversion is requested for ongoing maintenance projects for the 100-year-old HHWP System. The position does carpentry work including maintenance, rehabilitation, and repair of aging assets.
HHP10 Hetchy
Water (298646)
AN NEW - 5207_C - Associate Engineer 0.79 216,904 This role has been filled by a temporary position. Temporary to permanent position conversion is requested for this electrical engineering position. Currently a 5201 fills this role. We are requesting 5207 so incumbent has flex-up opportunities. Our goal is 29 of 36
to train and retain employees as they grow in experience and skillsets related to the hydro-generation assets that we maintain.
HHP10 Hetchy
Water (298646)
AN NEW - 5207_C - Associate Engineer 0.79 216,904 This role has been filled by a temporary position. Temporary to permanent position conversion is requested for this mechanical engineering position. Currently a 5201 fills this role. We are requesting a 5207 so incumbent has flex-up opportunities. Our goal is to train and retain employees as they grow in experience and skillsets related to the hydro-generation assets that we maintain.
HHP10 Hetchy
Water (298646)
S 0.00 -934,620 To offset temporary to permanent positions with budgeted attrition savings Total 3.95 0
30 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: HHP10 Hetchy Water (298646)
Proposal: AUTO - 302 - Transition 5 temporary positions to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 24970/298646/10000/10029992/0014 HHW is requesting conversion of Cat 18 positions to reflect that these positions are performing a permanent function. HHW manages a $15 billion portfolio of assets, many of which are beyond their useful lives. Temporary positions have been added to address both new and ongoing maintenance for the 100-year-old system. Conversion of these positions from Temp to Perm, will provide for the stability of these positions, and for ongoing maintenance of the Hetch Hetchy Water and Power system.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 821,571 5010 - Salaries 59993M - Attrition Savings (821,571)
5010 - Salaries 0
5130 - Fringe Benefits 519990 - Other Fringe Benefits 0 5130 - Fringe Benefits 0
Summary 0
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
HHP10 Hetchy
Water (298646)
AN NEW - 5601_C - Utility Analyst 1.00 193,798 This role has been filled by a temporary position. Hetch Hetchy Water (HHW) manages a $15 billion asset portfolio comprised of over 12,000 asset records. These asset records are maintained by the HHW Planning Section and are critical to the operation and maintenance of water and power systems. To ensure the HHW Planning Section can keep pace with this growth, maintain accurate asset records, and continue to develop effective maintenance strategies, a temporary to permanent conversion of a 5601 position is requested.
HHP10 Hetchy
Water (298646)
AN NEW - 7318_C - Electronic Maintenance
Technician
1.00 246,345 This role has been filled by a temporary position. Temporary to permanent position conversion is requested for ongoing maintenance projects for the 100-year-old HHWP System, including integration of new assets. The position performs a wide variety of highly skilled technical work including troubleshooting, maintenance, testing, repair, calibration, fabrication, installation and modification of electronic equipment and related control system components of powerhouses, power transmission and distribution systems.
HHP10 Hetchy
Water (298646)
AN NEW - 7344_C - Carpenter 1.00 193,795 This role has been filled by a temporary position. Temporary to permanent position conversion is requested for ongoing maintenance projects for the 100-year-old HHWP System. The position does carpentry work including maintenance, rehabilitation, and repair of aging assets.
HHP10 Hetchy
Water (298646)
AN NEW - 5207_C - Associate Engineer 1.00 274,562 This role has been filled by a temporary position. Temporary to permanent position conversion is requested for this electrical engineering position. Currently a 5201 fills this role. We are requesting 5207 so incumbent has flex-up opportunities. Our goal is 31 of 36
to train and retain employees as they grow in experience and skillsets related to the hydro-generation assets that we maintain.
HHP10 Hetchy
Water (298646)
AN NEW - 5207_C - Associate Engineer 1.00 274,562 This role has been filled by a temporary position. Temporary to permanent position conversion is requested for this mechanical engineering position. Currently a 5201 fills this role. We are requesting a 5207 so incumbent has flex-up opportunities. Our goal is to train and retain employees as they grow in experience and skillsets related to the hydro-generation assets that we maintain.
HHP10 Hetchy
Water (298646)
S 0.00 -1,183,062 To offset temporary to permanent positions with budgeted attrition savings Total 5.00 0
32 of 36
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: HHP10 Hetchy Water (298646)
Proposal: AUTO - 388 - HHW 1A - Mandatory Payments
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 24970/298646/10000/10029992/0014 Mandatory payment increases including payments to other governments, payments related to OSHA required medicals for staff, OS HA required training, and leasing payments for facilities.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 522000 - Training - Budget 54,000 5210 - Non-Personnel Services 527000 - Prof & Specialized Svcs-Bdgt 120,000 5210 - Non-Personnel Services 530000 - Rents-Leases-Bldgs&Struct-Bdgt 221,866 5210 - Non-Personnel Services 552110 - Taxes 10,721
5210 - Non-Personnel Services 552210 - Fees Licenses Permits 362,266 5210 - Non-Personnel Services 552410 - Payments To Other Govt 491,488 5210 - Non-Personnel Services 1,260,341
Summary 1,260,341
Professional Services
Organization Proposal Contractor Total
Request
Justification
HHP10 Hetchy Water (298646) AUTO - 388 - HHW 1A - Mandatory Payments
tbd 120,000 OSHA required medical surveillance testing and employee new hire physicals that DPH has said they can no longer support ($120k annually).
Professional Services Total 120,000
Non-Personnel Services
Organization Account Total
Request
Justification
HHP10 Hetchy Water (298646) 552210 - Fees Licenses Permits 19,784 Increase for miscellaneous fees, licenses and permits, including payments the California Department of Safety of Dams, CA professional license fees, state water system permits, county permit renewals, MTA parking permits, and Central Valley Salinity Coalition.
HHP10 Hetchy Water (298646) 552410 - Payments To Other Govt 491,488 Increase for payments to other governments including Turlock and Modesto Irrigation District (TID and MID) and Don Pedro Recreation association related to the FERC 4th Agreement and relicensing of Don Pedro Dam. Tuolumne County for essential services, United States Geological Survey for stream gauge operations and maintenance.
HHP10 Hetchy Water (298646) 552210 - Fees Licenses Permits 342,482 Increase for payments to the National Park Service, Yosemite National Park for Watershed Protection and Security. The requested budget includes a proposal to convert law 33 of 36
enforcement staffing from seasonal to permanent staffing.
HHP10 Hetchy Water (298646) 552110 - Taxes 10,721 Increase to cover projected tax payments to Stanislaus, Tuolumne, San Joaquin, and Alameda counties, the city of Oakdale, and Banta Carbona Irrigation District.
HHP10 Hetchy Water (298646) 522000 - Training - Budget 54,000 OSHA required Health & Safety training.
HHP10 Hetchy Water (298646) 530000 - Rents-Leases-Bldgs&Struct-Bdgt 26,030 Permanent lease of office space in Sacramento (ongoing) with an annual cost increase of 3%
HHP10 Hetchy Water (298646) 530000 - Rents-Leases-Bldgs&Struct-Bdgt 195,836 Temporary lease of warehouse space while warehouse is being rebuilt. This cost will be ongoing for 5 years with an annual cost increase of 3%
Non-Personnel Services Total 1,140,341
34 of 36
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: HHP10 Hetchy Water (298646)
Proposal: AUTO - 388 - HHW 1A - Mandatory Payments
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 24970/298646/10000/10029992/0014 Mandatory payment increases including payments to other governments, payments related to OSHA required medicals for staff, OS HA required training, and leasing payments for facilities.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 522000 - Training - Budget 108,000 5210 - Non-Personnel Services 527000 - Prof & Specialized Svcs-Bdgt 245,220 5210 - Non-Personnel Services 530000 - Rents-Leases-Bldgs&Struct-Bdgt 450,389 5210 - Non-Personnel Services 552110 - Taxes 21,604
5210 - Non-Personnel Services 552210 - Fees Licenses Permits 802,649 5210 - Non-Personnel Services 552410 - Payments To Other Govt 938,933 5210 - Non-Personnel Services 2,566,795
Summary 2,566,795
Professional Services
Organization Proposal Contractor Total
Request
Justification
HHP10 Hetchy Water (298646) AUTO - 388 - HHW 1A - Mandatory Payments
tbd 245,220 OSHA required medical surveillance testing and employee new hire physicals that DPH has said they can no longer support ($120k annually).
Professional Services Total 245,220
Non-Personnel Services
Organization Account Total
Request
Justification
HHP10 Hetchy Water (298646) 552210 - Fees Licenses Permits 40,458 Increase for miscellaneous fees, licenses and permits, including payments the California Department of Safety of Dams, CA professional license fees, state water system permits, county permit renewals, MTA parking permits, and Central Valley Salinity Coalition.
HHP10 Hetchy Water (298646) 552410 - Payments To Other Govt 938,933 Increase for payments to other governments including Turlock and Modesto Irrigation District (TID and MID) and Don Pedro Recreation association related to the FERC 4th Agreement and relicensing of Don Pedro Dam. Tuolumne County for essential services, United States Geological Survey for stream gauge operations and maintenance.
HHP10 Hetchy Water (298646) 552210 - Fees Licenses Permits 762,191 Increase for payments to the National Park Service, Yosemite National Park for Watershed Protection and Security. The requested budget includes a proposal to convert law 35 of 36
enforcement staffing from seasonal to permanent staffing.
HHP10 Hetchy Water (298646) 552110 - Taxes 21,604 Increase to cover projected tax payments to Stanislaus, Tuolumne, San Joaquin, and Alameda counties, the city of Oakdale, and Banta Carbona Irrigation District.
HHP10 Hetchy Water (298646) 522000 - Training - Budget 108,000 OSHA required Health & Safety training.
HHP10 Hetchy Water (298646) 530000 - Rents-Leases-Bldgs&Struct-Bdgt 52,841 Permanent lease of office space in Sacramento (ongoing) with an annual cost increase of 3%
HHP10 Hetchy Water (298646) 530000 - Rents-Leases-Bldgs&Struct-Bdgt 397,548 Temporary lease of warehouse space while warehouse is being rebuilt. This cost will be ongoing for 5 years with an annual cost increase of 3%
Non-Personnel Services Total 2,321,575