Wastewater Enterprise New Proposals
Division Proposal FY 2026‐27 FY 2027‐28 Page
WWE Administration 354 Transition 3 temporary position to permanent FTE ‐$ ‐$ 1‐4 Southeast Community Center 1182 SECC New Proposal 450,000 $ 450,000$ 5‐6 Regulatory Compliance 365 Transition 2 temporary position to permanent FTE ‐$ ‐$ 7‐8 Maintenance 724 Biogas O&M Contract 1,000,000$ 9
725 Biosolids Digester Facilities Project Power 4,000,000$ 10 743 Furniture for Biosolids Digester Facilities Project & South East Plant 940 2,189,907 $ 11 744 Furniture for South East Plant 7 2,000,000$ 12
Operations 899 Chemical Increase from Biosolids Digester Facilities and TI 1,500,000$ 13 Environmental Engineering 620 Equipment Maintenance Increase 712,000 $ 712,000$ 14‐15 Wastewater Lab 537 New Proposal ‐ Equipment 327,082 $ 16‐17 538 New Proposal ‐ Equipment 580,987$ 18‐19
3,678,989 $ 10,242,987$
*FTE costs show preliminary estimates and do not include latest COLA assumptions due to timing Wastewater Total
‐
‐
‐
‐
‐
‐
‐
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WWE0101 Administration (229267)
Proposal: AUTO - 354 - Transition 3 temporary position to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229267/10000/10030000/0001 Transition 3 temporary position to permanent FTE.
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 380,550 5010 - Salaries 59993M - Attrition Savings (380,550)
5010 - Salaries 0
5130 - Fringe Benefits 519990 - Other Fringe Benefits 0 5130 - Fringe Benefits 0
Summary 0
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WWE0101
Administration
(229267)
S 0.00 -547,992 offset new positions with attrition savings WWE0101
Administration
(229267)
AN NEW - 1824_C - Principal Administrative
Analyst
0.79 204,713 This role has been filled by a temporary position. This position fulfills an essential function in managing and administering the CIP. The role provides oversight of capital funds, ensures compliance with SFPUC/CCSF finance & bond requirements, facilitates coordination btw the Enterprise, Finance, and Project Controls. These responsibilities are not temporary or project specific. A permanent position is critical and will ensure stability, accountability, and continuity in enterprise capital budget management and reporting.
WWE0101
Administration
(229267)
AN NEW - 1840_C - Junior Management
Assistant
0.79 123,019 This role has been filled by a temporary position. This position is essential to WWE’s recruitment operations. The role develops, implements, and refines hiring processes; coordinates recruitment activities; and ensures consistent communication across depts and stakeholders. These duties are not project-based, support long-term org goals by improving efficiency, maintaining compliance, and aligning workforce planning. A permanent position will provide continuity, accountability, and sustained process improvement critical to WWE’s hiring success.
WWE0101
Administration
(229267)
AN NEW - 0923_C - Manager II 0.79 220,260 This role has been filled by a temporary position. This position oversees critical, ongoing functions central to WWE’s workforce development and operational readiness. These responsibilities are continuous and essential to maintaining compliance, ensuring skilled staffing for plant operations, and supporting long-term 1 of 19
workforce sustainability. Converting the position to permanent will provide the stability and continuity necessary to effectively manage these programs and strengthen WWE’s operational capacity.
Total 2.37 0
2 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE0101 Administration (229267)
Proposal: AUTO - 354 - Transition 3 temporary position to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229267/10000/10030000/0001 Transition 3 temporary positions to permanent FTE
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 481,709 5010 - Salaries 59993M - Attrition Savings (481,709)
5010 - Salaries 0
5130 - Fringe Benefits 519990 - Other Fringe Benefits 0 5130 - Fringe Benefits 0
Summary 0
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WWE0101
Administration
(229267)
S 0.00 -693,661 offset new positions with attrition savings WWE0101
Administration
(229267)
AN NEW - 1824_C - Principal Administrative
Analyst
1.00 259,131 This role has been filled by a temporary position. This position fulfills an essential function in managing and administering the CIP. The role provides oversight of capital funds, ensures compliance with SFPUC/CCSF finance & bond requirements, facilitates coordination btw the Enterprise, Finance, and Project Controls. These responsibilities are not temporary or project specific. A permanent position is critical and will ensure stability, accountability, and continuity in enterprise capital budget management and reporting.
WWE0101
Administration
(229267)
AN NEW - 1840_C - Junior Management
Assistant
1.00 155,720 This role has been filled by a temporary position. This position is essential to WWE’s recruitment operations. The role develops, implements, and refines hiring processes; coordinates recruitment activities; and ensures consistent communication across depts and stakeholders. These duties are not project-based, support long-term org goals by improving efficiency, maintaining compliance, and aligning workforce planning. A permanent position will provide continuity, accountability, and sustained process improvement critical to WWE’s hiring success.
WWE0101
Administration
(229267)
AN NEW - 0923_C - Manager II 1.00 278,810 This role has been filled by a temporary position. This position oversees critical, ongoing functions central to WWE’s workforce development and operational readiness. These responsibilities are continuous and essential to maintaining compliance, ensuring skilled staffing for plant operations, and supporting long-term 3 of 19
workforce sustainability. Converting the position to permanent will provide the stability and continuity necessary to effectively manage these programs and strengthen WWE’s operational capacity.
Total 3.00 0
4 of 19
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WWE0102 Admin SE Community (229268)
Proposal: AUTO - 1182 - Southeast Community Center (SECC) Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229268/10000/10030000/0001 Currently, the Southeast Community Center (SECC) does not have a sustainable source of funding for events, programs, and services. The SECC has historically relied on addback funding, creating inconsistency and uncertainty since funds are not guaranteed each year. The addition of these funds to the WWE Operating Budget will reduce SECC’s reliance on addback funding and provide the necessary funding needed for events, programs, and services to continue, ensuring that the SFPUC meets its community obligation and adhere to Order No. WQG 81-1 of the California State Waterboard.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 527000 - Prof & Specialized Svcs-Bdgt 450,000 5210 - Non-Personnel Services 450,000
Summary 450,000
Professional Services
Organization Proposal Contractor Total
Request
Justification
WWE0102 Admin SE Community
(229268)
AUTO - 1182 - Southeast
Community Center (SECC)
TBD 450,000 The addition funds to the WWE Operating Budget will reduce SECC’s reliance on addback funding and provide the necessary funding needed for events, programs, and services to continue, ensuring that the SFPUC meets its community obligation and adhere to Order No. WQG 81-1 of the California State Waterboard.
Professional Services Total 450,000
5 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE0102 Admin SE Community (229268)
Proposal: AUTO - 1182 - Southeast Community Center (SECC) Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229268/10000/10030000/0001 Currently, the Southeast Community Center (SECC) does not have a sustainable source of funding for events, programs, and services. The SECC has historically relied on addback funding, creating inconsistency and uncertainty since funds are not guaranteed each year. The addition of these funds to the WWE Operating Budget will reduce SECC’s reliance on addback funding and provide the necessary funding needed for events, programs, and services to continue, ensuring that the SFPUC meets its community obligation and adhere to Order No. WQG 81-1 of the California State Waterboard.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 527000 - Prof & Specialized Svcs-Bdgt 450,000 5210 - Non-Personnel Services 450,000
Summary 450,000
Professional Services
Organization Proposal Contractor Total
Request
Justification
WWE0102 Admin SE Community
(229268)
AUTO - 1182 - Southeast
Community Center (SECC)
TBD 450,000 The addition funds to the WWE Operating Budget will reduce SECC’s reliance on addback funding and provide the necessary funding needed for events, programs, and services to continue, ensuring that the SFPUC meets its community obligation and adhere to Order No. WQG 81-1 of the California State Waterboard.
Professional Services Total 450,000
6 of 19
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WWE0103 Regulatory Compliance (229269)
Proposal: AUTO - 365 - Transition 2 temporary position to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229269/10000/10030000/0001 Transition 2 temporary positions to permanent FTE
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 255,564 5010 - Salaries 59993M - Attrition Savings (255,564)
5010 - Salaries 0
5130 - Fringe Benefits 519990 - Other Fringe Benefits 0 5130 - Fringe Benefits 0
Summary 0
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WWE0103
Regulatory
Compliance
(229269)
AN NEW - 5620_C - Regulatory Specialist 0.79 184,006 This role has been filled by a temporary position. This proposal seeks to move this 5620 Regulatory Specialist from a temporary funded position to a permanent PCS position. This position in Regulatory Compliance plays a key role is assuring WWE’s compliance with Federal, State, and local regulations. There is an ongoing need for the work performed by this 5620 Regulatory Specialist and WWE needs to fund on a permanent rather than temporary basis.
WWE0103
Regulatory
Compliance
(229269)
S 0.00 -368,012 offset new positions with attrition savings WWE0103
Regulatory
Compliance
(229269)
AN NEW - 5620_C - Regulatory Specialist 0.79 184,006 This role has been filled by a temporary position. This proposal seeks to move this 5620 Regulatory Specialist from a temporary funded position to a permanent PCS position. This position in Regulatory Compliance plays a key role is assuring WWE’s compliance with Federal, State, and local regulations. There is an ongoing need for the work performed by this 5620 Regulatory Specialist and WWE needs to fund on a permanent rather than temporary basis.
Total 1.58 0
7 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE0103 Regulatory Compliance (229269)
Proposal: AUTO - 365 - Transition 2 temporary position to permanent FTE Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229269/10000/10030000/0001 Transition 2 temporary positions to permanent FTE
Account Level 5 Account Total Request
5010 - Salaries 501010 - Perm Salaries-Misc-Regular 323,498 5010 - Salaries 59993M - Attrition Savings (323,498)
5010 - Salaries 0
5130 - Fringe Benefits 519990 - Other Fringe Benefits 0 5130 - Fringe Benefits 0
Summary 0
Position Change
Organization Indicator Position
Identifier
Position Count Total
Request
Justification
WWE0103
Regulatory
Compliance
(229269)
AN NEW - 5620_C - Regulatory Specialist 1.00 232,919 This role has been filled by a temporary position. This proposal seeks to move this 5620 Regulatory Specialist from a temporary funded position to a permanent PCS position. This position in Regulatory Compliance plays a key role is assuring WWE’s compliance with Federal, State, and local regulations. There is an ongoing need for the work performed by this 5620 Regulatory Specialist and WWE needs to fund on a permanent rather than temporary basis.
WWE0103
Regulatory
Compliance
(229269)
S 0.00 -465,838 offset new positions with attrition savings WWE0103
Regulatory
Compliance
(229269)
AN NEW - 5620_C - Regulatory Specialist 1.00 232,919 This role has been filled by a temporary position. This proposal seeks to move this 5620 Regulatory Specialist from a temporary funded position to a permanent PCS position. This position in Regulatory Compliance plays a key role is assuring WWE’s compliance with Federal, State, and local regulations. There is an ongoing need for the work performed by this 5620 Regulatory Specialist and WWE needs to fund on a permanent rather than temporary basis.
Total 2.00 0
8 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE04 Bayside Operations (229292)
Proposal: AUTO - 724 - Biogas O&M Contract
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229292/10000/10030002/0004 WWE's new Biogas Facility will take digester gas from the Biosolids Digester Facilities Project (BDFP), clean the gas to PG&E standards, and inject the gas into the PG&E gas grid. This facility is expected to become operational in January of 2027. The Operation and Maintenance of the facility will be contracted to a third party for the first 5 years of its existence. The contract will go out to bid and have bids received before January 2027. Cost of the contract is currently projected to be $1M annually. WWE expects to absorb the costs during the first six month but will require new funding beginning in FY28.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 527000 - Prof & Specialized Svcs-Bdgt 1,000,000 5210 - Non-Personnel Services 1,000,000
Summary 1,000,000
Professional Services
Organization Proposal Contractor Total
Request
Justification
WWE04 Bayside Operations (229292) AUTO - 724 - Biogas O&M Contract TBD 1,000,000 WWE's new Biogas Facility is expected to become operational in January of 2027. The Operation and Maintenance of the facility will be contracted to a third party for the first 5 years of its existence. The contract will go out to bid and have bids received before January 2027. Cost of the contract is currently projected to be $1M annually. WWE expects to absorb the costs during the first six month but will require new funding beginning in FY28.
Professional Services Total 1,000,000
9 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE04 Bayside Operations (229292)
Proposal: AUTO - 725 - Biosolids Digester Facilities Project (BDFP) and Biogas Power Increase Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229292/10000/10030002/0004 The Biosolids Digester Facilities Project (BDFP), which will change the way sludge is processed at the Southeast Plant (SEP), is scheduled to begin startup testing in January 2027, with full operations anticipated in July 2027.
For ongoing operations, the BDFP is expected to use approximately 4.1 MW of power, with a connected load of over 10 MW. In comparison, current solids treatment at SEP uses about 1.5 MW, which means the BDFP will add an estimated 2.6 MW of additional power demand.
The Biogas facility is projected to use about 1.6 MW, with a connected load of 2.6 MW. Taken together, the BDFP and Biogas facilities will increase total power usage by about 4.2 MW once both are in startup testing.
At an electricity rate of $0.18/kWh, this increase equates to an additional annual power cost of approximately $6,622,000.
Given the uncertainty surrounding actual power demand during startup and early operations, only $4,000,000 is being requested at this time to cover anticipated costs.
Account Level 5 Account Total Request
5810 - Work Orders 581051 - GF-PUC-Light Heat & Power 4,000,000 5810 - Work Orders 4,000,000
Summary 4,000,000
Work Orders
Organization Account Total
Request
Justification
WWE04 Bayside Operations (229292) 581051 - GF-PUC-Light Heat & Power 4,000,000 Current solids treatment at SEP is estimated to use approximately 1.5 MW of power. Once BDFP and the Biogas Facility are online power usage is estimated to increase to roughly
4.1MW, with a connected load of over 10 MW, leaving an increase of 2.6 MW to account for. WWE expects to absorb these increases for the initial period of operation from Jan- June of 2027, but additional funds are needed to support the power needs of the new facilities.
Work Orders Total 4,000,000
10 of 19
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WWE03 Maintenance (229281)
Proposal: AUTO - 743 - Furniture for Biosolids Digester Facilities Project (BDFP) & South East Plant (SEP) 940 Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229281/10000/10030002/0001 New facilities are delivered unfurnished and not ready for occupancy. BDFP's furniture and other Materials and Supplies for o ffices, conference room, control room, etc., is estimated at $439,500 and $1,317,648 for non-process equipment (forklifts, pallet jacks, grinders, etc.), totaling $1.8M. SEP 940, the Maintenance Building at the Southeast Plant, is being renovated. New furniture is needed for offices, break rooms and conference rooms. Furniture is estimated at $254,568, with an additional $92,543 in Equipment costs, for a total of $347,112. Costs are based on prices of city approved vendors.
Account Level 5 Account Total Request
5400 - Materials & Supplies 549990 - Other Materials & Supplies 779,716 5400 - Materials & Supplies 779,716
5600 - Equipment 560990 - Other Equipment 1,410,191
5600 - Equipment 1,410,191
Summary 2,189,907
Equipment
Organization Equipment No. Equipment
Ind
Item Title Quantity Base Total Accessories
Cost
Total
Request
Justification
WWE03
Maintenance
(229281)
PUC2027WW6238 N BDFP & 940
Equipment
1 0 0 1,410,191 These new facilities are not delivered with non-process equipment that is critical to the ongoing operation and maintenance of the facilities including Operations Consoles, Microwave Analyzers, Scissor Lifts, etc. Included in these costs are also large-scale workstations and other furnishings valued at more than $10K/unit
Equipment Total 0 1,410,191
Materials & Supplies
Organization Account Total
Request
Justification
WWE03 Maintenance (229281) 549990 - Other Materials & Supplies 779,716 These facilities are delivered without the furnishings and other supplies to make them habitable workspaces. This includes desks and chairs, computer equipment, and conference room and breakroom materials
Materials & Supplies Total 779,716
11 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE03 Maintenance (229281)
Proposal: AUTO - 744 - Furniture for South East Plant (SEP) 7 Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229281/10000/10030002/0001 SEP 850 is being demolished and SEP-7 Operations, Engineering, and Maintenance - Buildings 603 and 914 will be under construction, anticipated to be complete in March 2028. Funding for furniture is estimated at $2M with funding needed at the beginning of FY28.
Account Level 5 Account Total Request
5600 - Equipment 560990 - Other Equipment 2,000,000
5600 - Equipment 2,000,000
Summary 2,000,000
Equipment
Organization Equipment No. Equipment
Ind
Item Title Quantity Base Total Accessories
Cost
Total
Request
Justification
WWE03
Maintenance
(229281)
PUC2028WW6239 N SEP-7
Equipment
0 0 2,000,000 SEP-7 Operations, Engineering, and Maintenance - Buildings 603 and 914 will be under construction, anticipated to be complete in March 2028. Funding for furniture is estimated at $2M with funding needed at the beginning of FY28.
Equipment Total 0 2,000,000
12 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE04 Bayside Operations (229292)
Proposal: AUTO - 899 - Chemical Increase from BDFP and TIF Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229292/10000/10030002/0004 Treasure Island Water Resource Recovery Facility (TIF) is anticipated to go through startup testing in the winter/spring of 2026 and be online starting in FY27. Biosolids Digester Facilities Project (BDFP), startup testing is scheduled to begin in January 2027 with full operation anticipated at the beginning of FY28. These new facilities will require more and different chemicals than the old facility. Chemical expenses will increase once startup testing commences. WWE expects to absorb these increases for the initial period of operation from winter/spring of 2026-June 2027.
Account Level 5 Account Total Request
5400 - Materials & Supplies 548990 - Water &Sewage Treatment Supply 1,500,000 5400 - Materials & Supplies 1,500,000
Summary 1,500,000
Materials & Supplies
Organization Account Total
Request
Justification
WWE04 Bayside Operations (229292) 548990 - Water &Sewage Treatment Supply 1,500,000 The Treasure Island Water Resource Facility (TIF) is anticipated to go through startup testing in 2026 and be online in FY27. BDFP startup testing is scheduled to begin in Jan 2027 with full operation anticipated at the beginning of FY28. These new facilities will require more and different chemicals than the old facility. Chemical expenses will increase once startup testing commences. WWE expects to absorb these increases for the initial period of operation in FY27.
Materials & Supplies Total 1,500,000
13 of 19
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WWE06 Environmental Engr (229302)
Proposal: AUTO - 620 - Equipment Maintenance Increase
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229302/10000/10030002/0001 Engineering’s current budget for Other Equipment Maintenance is $16,000, which is not sufficient to cover the annual cost of the Foxboro Distributed Control System (DCS) support contract. An additional $712,000 per year is needed in FY27 and FY28 to ensure continued vendor support and maintenance of this critical system.
In recent years, the Operations Division has absorbed these costs; however, their budget for this account is also inadequate to sustain such a large, ongoing expense. Without dedicated funding in Engineering’s budget, the reliability and supportability of the Foxboro DCS system—an essential component of plant operations—would be at risk.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 529990 - Other Equip Maint 712,000 5210 - Non-Personnel Services 712,000
Summary 712,000
Non-Personnel Services
Organization Account Total
Request
Justification
WWE06 Environmental Engr (229302) 529990 - Other Equip Maint 712,000 The Foxboro Distributed Control System is an essential, existing component of plant operations which requires ongoing support and maintenance via this service contract.
These costs have been absorbed in past years, but Engineering requires dedicated funding for this essential component of plant operations.
Non-Personnel Services Total 712,000
14 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE06 Environmental Engr (229302)
Proposal: AUTO - 620 - Equipment Maintenance Increase
Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/229302/10000/10030002/0001 Engineering’s current budget for Other Equipment Maintenance is $16,000, which is not sufficient to cover the annual cost of the Foxboro Distributed Control System (DCS) support contract. An additional $712,000 per year is needed in FY27 and FY28 to ensure continued vendor support and maintenance of this critical system.
In recent years, the Operations Division has absorbed these costs; however, their budget for this account is also inadequate to sustain such a large, ongoing expense. Without dedicated funding in Engineering’s budget, the reliability and supportability of the Foxboro DCS system—an essential component of plant operations—would be at risk.
Account Level 5 Account Total Request
5210 - Non-Personnel Services 529990 - Other Equip Manit 712,000 5210 - Non-Personnel Services 712,000
Summary 712,000
Non-Personnel Services
Organization Account Total
Request
Justification
WWE06 Environmental Engr (229302) 529990 - Other Equip Maint 712,000 The Foxboro Distributed Control System is an essential, existing component of plant operations which requires ongoing support and maintenance via this service contract.
These costs have been absorbed in past years, but Engineering requires dedicated funding for this essential component of plant operations.
Non-Personnel Services Total 712,000
15 of 19
Budget Request Summary by Proposal
Fiscal Year: 2026-27
Organization: WWE11 Wastewater Lab (295644)
Proposal: AUTO - 537 - New Proposal - Equipment FY26-27 Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/295644/10000/10030002/0001 Southeast, Oceanside, and Treasure Island Laboratories owns approximately $3,000,000 in laboratory analytical equipment that were manufactured with an intended useful life of seven to ten years. As part of the SFPUC’s on-going effort to implement an effective Asset Management program, the Laboratories requests funds to replace equipment that is woefully out-of-date. This equipment, sophisticated equipment manufactured to support complex analytical testing, is critical to ensuring compliance with State and Federal regulations, as well protecting public health, and responding to emergencies.
Account Level 5 Account Total Request
5600 - Equipment 560000 - Equipment Purchase-Budget 327,082 5600 - Equipment 327,082
Summary 327,082
Equipment
Organization Equipment No. Equipment
Ind
Item Title Quantity Base Total Accessories
Cost
Total
Request
Justification
WWE11
Wastewater Lab
(295644)
PUC2027WW4396 N Gas
Chromatograph-
Mass
Spectrometer
1 0 0 241,364 Gas Chromatograph-Mass Spectrometer (GC-MS) replacement is needed for testing of EPA 625.1 SVOC. This is used to detect 53 EPA Priority Pollutants which affect public health and environmental safety. Our current GC-MS unit is 11 years old and has increased maintenance, resulting in frequent downtime. This affects our ability to meet regulatory requirements of our treatment plants and industrial pretreatment programs.
WWE11
Wastewater Lab
(295644)
PUC2027WW4400 N HEPA (High-
Efficiency
Particulate Air)
fume hood
1 0 0 42,219 HEPA (High-Efficiency Particulate Air) fume hood creates an ultra-clean, particle-free environment that prevents contamination from dust and particulates. Since (13) Priority Pollutant trace metal analysis detects elements at parts-per-trillion levels, even minimal contamination can compromise results. Metals analysis is needed to comply with NPDES regulatory requirements for SE/OS/TI Treatment Plants. Our current HEPA hoods are over 20 years old and cannot find replacement parts for repairs.
WWE11
Wastewater Lab
(295644)
PUC2027WW4398 N Laboratory
Glassware
Washer
1 0 0 13,485 Laboratory Glassware Washer needed to replace older units that are over 20 years old. This equipment designed to properly clean and disinfect scientific glassware, preventing contamination and ensuring the accuracy of testing. These units can withstand exposure to harsh chemicals, high temperatures, and reagent residues. They can clean narrow-necked volumetric flasks and pipettes, ensuring thorough cleaning needed for contaminant-sensitive procedures.
WWE11
Wastewater Lab
(295644)
PUC2027WW8322 N Laboratory
Glassware
Washer
1 0 0 13,485 Laboratory Glassware Washer needed to replace older units that are over 20 years old. This equipment designed to properly clean and disinfect scientific glassware, preventing contamination and ensuring the accuracy of testing. These units can withstand exposure to harsh chemicals, high temperatures, and reagent residues. They can clean narrow-necked volumetric flasks and pipettes, ensuring thorough cleaning needed for 16 of 19
contaminant-sensitive procedures.
WWE11
Wastewater Lab
(295644)
PUC2027WW4359 N Millipore Sigma 1 0 0 16,530 Millipore IQ 7000 purification system: Lab requires system to remove organic contaminants from DI water used in QC samples and sample extraction. This is needed NPDES monitoring and compliance. Testing for EPA Priority Pollutants demands detection at parts-per-trillion levels. Any contamination by organic substances could severely hinder laboratory operations, compromise the integrity of results, and place regulatory compliance at significant risk.
Equipment Total 0 327,082
17 of 19
Budget Request Summary by Proposal
Fiscal Year: 2027-28
Organization: WWE11 Wastewater Lab (295644)
Proposal: AUTO - 538 - New Proposal - Equipment FY27-28 Change Request Type: New Proposals
Fund/Dept/Auth/Proj/Act: 20160/295644/10000/10030002/0001 Southeast, Oceanside, and Treasure Island Laboratories owns approximately $3,000,000 in laboratory analytical equipment that were manufactured with an intended useful life of seven to ten years. As part of the SFPUC’s on-going effort to implement an effective Asset Management program, the Laboratories requests funds to replace equipment that is woefully out-of-date. This equipment, sophisticated equipment manufactured to support complex analytical testing, is critical to ensuring compliance with State and Federal regulations, as well protecting public health, and responding to emergencies.
Account Level 5 Account Total Request
5600 - Equipment 560000 - Equipment Purchase-Budget 580,987 5600 - Equipment 580,987
Summary 580,987
Equipment
Organization Equipment No. Equipment
Ind
Item Title Quantity Base Total Accessories
Cost
Total
Request
Justification
WWE11
Wastewater Lab
(295644)
PUC2028WW4404 N FIALYZER 1 0 0 97,980 FIAlyzer is a flow injection analysis (FIA) system used for Ammonia (NH3) and Total Kjeldahl Nitrogen (TKN) analysis. It improves throughput, accuracy, and sensitivity by eliminating interferences and allows more samples to be processed and increases sensitivity for NH3 analysis which will meet the new TIF NPDES permit. For TKN, automated in-line digestion increases efficiency and reduces the use of hazardous chemicals. This equipment is used analyze NPDES Regulatory and other client samples.
WWE11
Wastewater Lab
(295644)
PUC2028WW4401 N Gas
Chromatograph-
Mass
Spectrometer
(GC-MS)
1 0 0 317,228 Gas Chromatograph-Mass Spectrometer (GC-MS) replacement is needed for testing of EPA 624.1 VOC. This is used to detect (32) EPA Priority Pollutants which affects public health and environmental safety. Our current GC-MS unit is 7 years old and has increased maintenance, resulting in frequent downtime. This affects our ability to meet regulatory requirements of our treatment plants and industrial pretreatment programs.
WWE11
Wastewater Lab
(295644)
PUC2028WW4402 N Gas
Chromatograph-
Mass
Spectrometer
(GC-MS)
1 0 0 131,323 Gas Chromatography Electron Capture Detector (GC-ECD) replacement is needed analyze EPA 608.3 PCBs and Pesticides. This is used to detect (25) EPA Priority Pollutants which affect public health and environmental safety.
Our current GC-ECD unit is 15 years old and has increased maintenance, resulting in frequent downtime. This affects our ability to meet regulatory requirements of our treatment plants and industrial pretreatment programs.
WWE11
Wastewater Lab
(295644)
PUC2028WW4405 N Microwave
Digestor
1 0 0 34,456 Microwave Digestor is used for metals analysis by using high temperatures and pressures in a closed system to completely break down complex sample matrices into a liquid which allows samples to be tested on ICP-MS.
The efficiency and speed of microwave digestion also reduce sample contamination, improve the quality of the digested solution, and increase overall lab throughput. It will cause serious complications for the Laboratory and Regulatory Group jeopardizing regulatory compliance. 18 of 19
Equipment Total 0 580,987