OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.
Contract Administration Bureau
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
T 415.551.4603
F 415.554.3225
TTY 415.554.3488
TO: Commissioner Joshua Arce, President
Commissioner Stephen E. Leveroni, Vice President
Commissioner Avni Jamdar
Commissioner Kate H. Stacy
Commissioner Meghan Thurlow
THRU: Dennis J. Herrera, General Manager
FROM: Kyndra Cox, Director - Contract Administration Bureau, Infrastructure Division
Stephen Robinson, Assistant General Manager, Infrastructure Division
DATE: February 2, 2026
SUBJECT: Contract Advertisement Report and Competitive Selection Process Communications Policy Restricted Communications Period Report: February 10, 2026
Contract Advertisement Report
Construction:
Contract Number and Title:
JOC-114, General Engineering (A-License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Contract Estimate:
$5,000,000
Program:
N/A
Estimated Date of Advertisement:
March 2026
Description of Contract Work:
The contract work locations are San Francisco, San Mateo, Santa Clara, and Alameda Counties. This Job Order Contract will be utilized for general engineering (A – License) construction tasks to construct, maintain, repair and/or install facilities and assets for all San Francisco Public Utilities Commission (SFPUC) enterprise operations and bureaus as set forth in the contract bidding documents, and may include the following: Moving, Demolition, Cathodic Protection, Concrete, Construction Traffic Control Services, Earthwork & Paving, Electrical, General Building Construction, Hazardous Waste and Remediation Service, Landscape, Masonry, Painting/Waterproofing, Pipeline, Plumbing, Reinforcing Steel, Security Integration, Tree Service, Trucking & Hauling, Welding, Well Pump Repair, and Well Drilling.
Project Manager:
Judy Chin
Contract Number and Title:
WD-2885, 8-Inch Ductile Iron Water Main Replacement, Sewer Replacement, and Paving Renovation on Fulton St. from Great Highway to 31st Ave. and on Various Side Streets
Contract Estimate:
$12,100,000
Program:
Local Water Capital Improvement Program – Local Water
Conveyance/Distribution System Program
Estimated Date of Advertisement:
February 2026
Description of Contract Work:
The scope of work includes installing approximately 18,300 linear feet of 4–, 6–, and 8–inch ductile iron pipe and installing and/or support of approximately 7,550 linear feet of 1–inch and 2–inch copper tubing service pipe, upgrade sewer lines and complete paving renovation.
Project Manager:
Jon Cantu
Contract Number and Title:
WD-2922, 8-inch Ductile Iron Water Main Replacement on Lincoln Way and Irving St from Sunset Blvd to 19th Ave and Various Side Streets Contract Estimate:
$20,800,000
Programs:
Water Enterprise Local Conveyance/Distribution System Program - Wastewater Enterprise Renewal and Replacement Program
Estimated Date of Advertisement:
February 2026
Description of Contract Work:
The contract work includes the installation of 24,300 feet of 4-, 6-inch and 8-inch ductile iron water conveyance pipe, sewer lining and replacement work, ancillary water service pipe, curb ramps, and pavement restoration.
Project Manager:
Ryan Freeborn
Contract Number and Title:
WD-2931, Harding Park Pump Station
Contract Estimate:
$3,100,000
Program:
Water Enterprise Local Water Capital Improvement Program Estimated Date of Advertisement:
March 2026
Description of Contract Work:
The contract work consists of constructing a new, conditioned concrete masonry unit electrical building to house new electrical equipment, replacing the existing Watertronics vendor Programmable Logic Controller (PLC) with a SFPUC standard PLC, and various repairs and modifications to the existing pump station building.
Project Manager:
Barbara Palacios
Competitive Selection Process Communications Policy
Restricted Communications Period Report
The following competitive solicitations are published and are within the Restricted Communications Period under the Public Utilities Commission Competitive Selection Process
Communications Policy0F0F
1:
Program Contract No. Title Publication
Date
Water Enterprise Local
Water Capital
Improvement Program
WD-2931 Harding Park Pump Station February 10,
2026
Water Enterprise Local
Conveyance/Distribution
System Program -
Wastewater Enterprise
Renewal and
Replacement Program
WD-2922
8-inch Ductile Iron Water
Main Replacement on Lincoln
Way and Irving St from
Sunset Blvd to 19th Ave and
Various Side Streets
February 10,
2026
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2885
8-Inch Ductile Iron Water
Main Replacement, Sewer
Replacement, and Paving
Renovation on Fulton St. from
Great Highway to 31st Ave.
and on Various Side Streets
February 10,
2026
N/A JOC-114
General Engineering (A-
License) Construction, San
Francisco, San Mateo, Santa
Clara, and Alameda Counties
February 10,
2026
Urban Watershed
Planning PRO.0319 Urban Watershed Planning,
Programs & Policy
January 27,
2026
SFPUC Wastewater
Enterprise, Renewal and
Replacement Program
WW-785 As-Needed Spot Sewer
Replacement No. 49
January 27,
2026
1 On February 9, 2021, by Resolution No. 21-0022, the San Francisco Public Utilities Commission adopted a Competitive Selection Process Communications Policy. The policy establishes a Restricted Communications Period. The period starts immediately upon the publication of a Request for Qualifications, Request for Proposals, Request for Bids, Advertisement for Bids, or any other type of competitive solicitation for a contract or lease.
The period ends when the Commission awards the contract or lease or terminates the competitive process.
Program Contract No. Title Publication
Date
N/A WW-782
Wastewater Enterprise
Elevator Maintenance, Repair,
and Modernization 2026-2030
January 27,
2026
Hetch Hetchy Water &
Power HH-1019 2023 Storm Damage
Remaining Road Repairs
January 27,
2026
Hetch Hetchy Capital
Improvement Program DB-139R
Transmission Line Clearance
Mitigation Moderate and Low
Risk
January 27,
2026
SFPUC Wastewater
Enterprise, Renewal and
Replacement Program
WW-788 Various Large Diameter
Sewer Inspection No. 3
January 13,
2026
Water Capital
Improvement Program WD-2930B Master-As-Needed Peninsula Watershed Improvements
January 13,
2026
Water Capital
Improvement Program WD-2930A Master-As-Needed Alameda
Watershed Improvements
January 13,
2026
Hetch Hetchy Water and
Power 10-year Capital
Improvement Project
PRO.0347 As-Needed HHWP Engineering
Services
December 09,
2025
San Francisco Public
Utilities Commission
Local Water System
PRO.0346 As-Needed Curb Ramp
Engineering Design Services
December 09,
2025
Water Enterprise PRO.0295
WSTD Technical Services for
Pipeline and Tunnel
Inspection and Repair
Program
December 09,
2025
Water Capital
Improvement Program WD-2915 Crystal Springs Pipeline No. 2 Reach 5 Lining Replacement
December 09,
2025
Hetchy Capital
Improvement Project
under the Water Capital
Program
PRO.0343
Hetchy Capital Improvement
Projects As-Needed
Construction Management
and Staff Augmentation
Services
November 10,
2025
Wastewater Capital WW-756
Lower Alemany Area
Stormwater Improvements
Project
November 10,
2025
Environmental
Management Group PRO.0333 As-Needed Environmental
Review
October 14,
2025
Program Contract No. Title Publication
Date
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2919
8-Inch and 12-Inch Ductile
Iron Water Main Replacement
on 18th and Mariposa Streets
from Potrero Ave. to Texas
St. and on Various Side
Streets
October 14,
2025
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2918
8-Inch Ductile Iron Water
Main Replacement and Sewer
Replacement and
Rehabilitation on Harkness
Ave., Goettingen St., Brussels
St., and Various Locations
October 14,
2025
External Affairs PRO.0350(G) Hummingbird Urban
Demonstration Farm
September 23,
2025
Infrastructure Division PRO.0339 Power Capital Program
Management
September 23,
2025
Infrastructure Division PRO.0337
As-Needed Electrical and
Mechanical Engineering
Services
September 23,
2025
Water Enterprise PRO.0336 Specialized and Technical As- Needed Services
September 23,
2025
Infrastructure Division PRO.0317 As-Needed Safety Pre-
Qualification Consultant
September 23,
2025
Power Enterprise PRO.0234 CleanPowerSF In-City Solar September 23, 2025
Power Enterprise PRO.0223(R) 2025 Disadvantaged
Communities Green Tariff
September 23,
2025
SFPUC Wastewater
Enterprise, Renewal and
Replacement (R&R)
Program
WW-784 As-Needed Spot Sewer
Replacement No. 48
September 23,
2025
Local Water Main
Replacement Program WD-2923
24-Inch Water Main
Rehabilitation from University
Mound Reservoir South to 3rd
St.
September 23,
2025
Program Contract No. Title Publication
Date
Local Water Main
Replacement Program WD-2920
Water Main and Sewer
Replacement On Moraga,
Noriega, and Ortega Streets
From 8th to 11th Ave. and
Various Side Streets
September 23,
2025
Water Capital
Improvement Program WD-2914
Bay Division Pipelines Nos. 1
through 4 Lining and As-
Needed Pipeline Repairs
September 23,
2025
Hetch Hetchy Power PW-014 As-Needed Solar Services September 23, 2025
Hetchy Capital
Improvement Projects HH-1022
Cherry Valley Dam Spillway
Short Term Improvements
and Eleanor Dam Bridge
Interim Repair
September 23,
2025
Power Enterprise PRO.0286
As-Needed Technical Support
Services for Electric
Distribution Systems
July 22, 2025
Sewer System
Improvement Program WW-789
Southeast Water Pollution
Control Plant 516 and 516A
Sodium Bisulfite Storage
Tanks and Fill Station
July 22, 2025
Water Enterprise Capital
Improvement Program WD-2932
Cathodic Protection for
Transmission Pipelines at
Various Locations, Phase 3
July 22, 2025
Water Enterprise DB-142 525 Golden Gate On-Site
Non-Potable Water System July 08, 2025
Sewer System
Improvement Program DB-140
Secondary Clarifiers
Southeast Plant 230
Rehabilitation
July 08, 2025
Sewer System
Improvement Program DB-136
System-Wide Security
Enhancements for Treatment
Facilities and Pump Stations
July 08, 2025
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2886 University Mound Reservoir
North Basin Roof Coating June 10, 2025
Program Contract No. Title Publication
Date
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2877
As-Needed Ductile Iron Water
Main Replacement at Various
Locations No. 3
June 10, 2025
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2780
8-Inch Ductile Iron Water
Main Replacement on 21st St.
from Eureka St. to Church St.
and on Hill St. from Castro St.
to Church St. and Various
Side Streets
June 10, 2025
Hetch Hetchy Power PW-008R Moscone West Solar May 27, 2025 Hetch Hetchy Water
Program PRO.0327
Hetch Hetchy Water & Power
(HHWP) North American
Electric Reliability Corporation
(NERC) Compliance and Audit
Support
May 13, 2025
Southeast Community
Center Access Program PRO.0326(G)
Digital Equity Operator for the
Southeast Community Center
(SECC) Access Program
May 13, 2025
Workforce and
Economics Program
Services
PRO.0314
As-Needed Technical Support
Services for Contractors
Assistance Center
May 13, 2025
SFPUC Wastewater
Enterprise, Sewer
System Improvement
Program
WW-780
Pump Station Security
Upgrades Cesar Chavez Pump
Station (CCS), Griffith Pump
Station (GFS), Channel Pump
Station (CHS), Merlin Morris
Pump (MMS)
February 25,
2025
Infrastructure PRO.0323 Government Procurement
Software
February 11,
2025
Sewer System
Improvement Program WW-719B
Folsom Area Stormwater
Improvements – Alameda
Street Wet Weather
Conveyance Tunnel
September 10,
2024
Power Enterprise PRO.0280 2024 CleanPowerSF
Renewable Energy Supplies June 25, 2024