DEPARTMENT

Infrastructure Division

AGENDA NO. 6c

MEETING DATE

March 10, 2026

AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

Calendar: Consent Calendar
Project Manager: Jon Cantu

Award Contract No. WD-2886, University Mound Reservoir North Basin Roof Coating

Summary of Proposed
Commission Action:

Award Contract No. WD-2886, University Mound Reservoir North Basin Roof Coating, to the responsible bidder that submitted the lowest responsive bid, Angelus Waterproofing and Restoration, Inc., in the amount of $2,838,777 and with a duration of 154 consecutive calendar days (approximately five months), to recoat the entirety of the University Mound Reservoir north basin roof slab.

Background: The recoating work under this contract is part of the San Francisco Public Utilities Commission (SFPUC) Water Enterprise Local Reservoir/Tank Improvements Program . The program focuses on the renewal and rehabilitation of water storage reservoirs and tanks within the San Francisco water distribution system. The existing roof coating system at the University Mound Reservoir N orth Basin was installed in 2011 and r epairs to the
waterproofing membrane are now needed to ensure the roof remains watertight.

SFPUC Power Enterprise plans to install a solar array on top of the University Mound Reservoir North Basin roof under a separate future contract, with an anticipated service life of approximately 25 years . In support of this effort, the existing roof coating was evaluated in early 2021 to determine whether it could provide an additional 20 years of service life without recoating. The assessment concluded that recoating would be necessary to achieve the appropriate service life concurrent with the planned solar installation.

Scope of Contract: The contract work location is in the Portola District in the City and County of San Francisco.

The contract work includes the following:
• Pressure washing of all surfaces to be coated, including the perimeter gutter to remove all dirt and debris;
• Wire brushing of all oxidation at the aluminum expansion joints and application of a rust inhibitive primer;
• Repair of the waterproofing membrane as needed;
• Provision of a suitable containment system to contain dust, debris, and overspray; and,
• Application of primer and two coats of polyurethane coating over the entire concrete roof slab of the University Mound Reservoir North Basin, totaling approximately 380,000 square-feet.

Agenda Title: WD-2886, University Mound Reservoir North Basin Roof Coating Commission Meeting Date: March 10, 2026

Page 2 ends

Funding and Costs: Funding Source: Project No. 10037794, University Mound Reservoir North Basin Roof Coating
Engineer’s Estimate: $4,665,000
Award: $2,838,777
Schedule: Estimated Notice-to-Proceed Date: July 2026
Estimated End Date: December 2026
Contract Duration: 154 consecutive calendar days ( 109 consecutive calendar days to Substantial Completion and an additional 45 consecutive calendar days to Final Completion).

Bid History:

Advertised: November 7, 2025
Bids Received: On December 11, 2025, SFPUC received 12 sealed bids.

Bid Rank Bid Amount Bid
Preference Adjusted Bid Final
Rank

1. Angelus
Waterproofing and
Restoration, Inc.
$2,838,777.00 N/A $2,838,777.00 1

2. Graham Prewett,
Inc. $3,685,000.00 N/A $3,685,000.00 2

3. Waterproofing
Associates, Inc. $4,228,865.00 N/A $4,228,865.00 3

4. Diablo Roofing,
Inc. $4,307,945.00 N/A $4,307,945.00 4

5. Brazos Thermal
Systems, Inc. DBA
Brazos Urethane
$4,351,619.00 N/A $4,351,619.00 5

6. 8. Pioneer
Contractors, Inc. $4,981,000.00 10% $4,482,900.00 6

7. San Francisco
Roofing Services,
Inc.10. San
Francisco Roofing
Services, Inc.
$5,076,600.00 10% $4,568,940.00 7

8. Best Contracting
Services, Inc.6. Best
Contracting Services,
Inc.
$4,630,950.00 N/A $4,630,950.00 8

9. Roofing
Constructors DBA
Western Roofing
Service7. Roofing
Constructors DBA
Western Roofing
Service
$4,789,652.00 N/A $4,789,652.00 9

10. Andy’s Roofing
Company, Inc.9.

Andy’s Roofing
$5,008,600.00 N/A $5,008,600.00 10
Agenda Title: WD-2886, University Mound Reservoir North Basin Roof Coating Commission Meeting Date: March 10, 2026

Page 3 ends

Company, Inc.

11. Courtney, Inc. $5,420,000.00 N/A $5,420,000.00 11

12. Stronger Building
Services $7,075,000.00 N/A $7,075,000.00 12

Application of bid preferences in accordance with Chapter 14B of the San Francisco Administrative Code changed the final ranking. However, there is no change to the lowest bidder. Pioneer Contractors, Inc., moved from 8 th to
6th ranked, and San Francisco Roofing Services, Inc., moved from 10th to 7th rank.

Environmental
Review:

This action does not constitute a project under the California Environmental Quality Act Guidelines S ection 15378 because there would be no physical change in the environment.

Local Business
Enterprise Utilization
and Non-
Discrimination in
Contracting:

The Contract Monitoring Division waived the Local Business Enterprise (LBE) subcontracting participation requirement for this contract.

Agenda Title: WD-2886, University Mound Reservoir North Basin Roof Coating Commission Meeting Date: March 10, 2026

Page 4 ends

San Francisco Project Location Map

PUBLIC UTILITIES COMMISSION
City and County of San Francisco

RESOLUTION NO.

WHEREAS, The San Francisco Public Utilities Commission (SFPUC) Water Enterprise Local Reservoir/Tank Improvements Program provides for renewal and rehabilitation of water storage reservoirs and tanks within the San Francisco distribution system . Staff identified the University Mound Reservoir, located in the Portola District of the City and County of San Francisco, as requiring restoration of its roof slab; and

WHEREAS, On November 7, 2025, SFPUC advertised Contract No. WD-2886, University Mound Reservoir North Basin Roof Coating; and

WHEREAS, The Engineer’s Estimate is $ 4,665,000 for this contract to recoat the entire University Mound Reservoir North Basin roof slab; and

WHEREAS, The contract duration is 154 consecutive calendar days; and

WHEREAS, On December 11, 2025, SFPUC received and publicly opened 12 bids; and

WHEREAS, SFPUC staff review ed the bids and the application of bid preferences and have determined that Angelus Waterproofing and Restoration, Inc., is the responsible bidder with the lowest responsive bid; and

WHEREAS, CMD waived the Local Business Enterprise (LBE) subcontracting participation requirement for this contract; and

WHEREAS, This action does not constitute a project under the California Environmental Quality Act Guidelines S ection 15378 because there would be no physical change in the environment; and

WHEREAS, Funds are available from Project No. 10037794, University Mound Reservoir North Basin Roof Coating; now, therefore, be it,

RESOLVED, That this Commission hereby awards Contract No. WD-2886, University Mound Reservoir North Basin Roof Coating, in the amount of $2,838,777 and a duration of 154 consecutive calendar days , to the responsible bidder that submitted the lowest responsive bid, Angelus Waterproofing and Restoration, Inc.

I hereby certify that the foregoing resolution was adopted by the San Francisco Public Utilities Commission at its meeting of March 10, 2026.

Director of Commission Affairs
San Francisco Public Utilities Commission