Cities Index.
Contract Advertisement Report

CleanPowerSF Sfpuc Commission
April 28, 2026

Document
Contract Advertisement Report
Meeting
April 28, 2026
Body
CleanPowerSF Sfpuc Commission
Pages
10
Original file
647 KB
Text extracted from the CCA's file for reading and search. Open the original on sfpuc.sharefile.com. That file is the official record.

OUR MISSION: To provide our customers with high-quality, efficient and reliable water, power and sewer services in a manner that values environmental and community interests and sustains the resources entrusted to our care.

Contract Administration Bureau
525 Golden Gate Avenue, 8th Floor
San Francisco, CA 94102
T 415.551.4603
F 415.554.3225
TTY 415.554.3488

TO: Commissioner Joshua Arce, President
Commissioner Stephen E. Leveroni, Vice President
Commissioner Avni Jamdar
Commissioner Kate H. Stacy
Commissioner Meghan Thurlow

THRU: Dennis J. Herrera, General Manager

FROM: Kyndra Cox, Director - Contract Administration Bureau, Infrastructure Division

Stephen Robinson, Assistant General Manager, Infrastructure Division

DATE: April 16, 2026

SUBJECT: Contract Advertisement Report and Competitive Selection Process Communications Policy Restricted Communications Period Report: April 28, 2026

Contract Advertisement Report
Construction:

Contract Number and Title:

DB-142, 525 Golden Gate On-Site Non-Potable Water System Contract Estimate:
$22,500,000
Program:

Water Enterprise
Estimated Date of Advertisement:

May 2026
Description of Contract Work:

Design and construction of new on-site water recycling system to provide non-potable water for toilet flushing within the 525 Golden Gate Building.

Project also includes the design and construction of a new potable reuse side stream treatment system to provide water tasting for educational purposes. Other work includes design and construction of irrigation system modifications, retrofitting of existing wetland planters, decommissioning of the Living Machine system, upgrades to the existing rainwater harvesting system and other related work for a complete and operable system.

Project Manager:

Barbara Palacios

Page 2 of 10 ends

Contract Number and Title:

WW-764, Various Locations Sewer Replacement No. 22
Contract Estimate:
$3,000,000
Program:

San Francisco Public Utilities Commission (SFPUC) Wastewater Enterprise, Renewal and Replacement (R&R) Program
Estimated Date of Advertisement:

May 2026
Description of Contract Work:

Contract work consists of replacing/lining the existing sewers on 7th Avenue from Hugo Street to Irving Street; Shrader Street from Waller Street to Beulah Street; Clayton Street from Waller Street to Frederick Street; Market Street from Short Street to Copper Alley; Miraloma Drive from Portola Drive to Marne Avenue; Joost Avenue from Detroit Street to Congo Street; Joost Avenue from Baden Street to Acadia Street; and 19th Avenue from Banbury Drive to Junipero Serra Boulevard.

Project Manager:

Aileen Caylao

Contract Number and Title:

WW-786, As-Needed Sewer Inspection (FY26) and Spot Lining Contract Estimate:
$4,500,000
Program:

SFPUC Wastewater Enterprise, R&R Program
Estimated Date of Advertisement:

July 2026
Description of Contract Work:

Contract work consists of contingency based as-needed sewer camera inspection and main sewer spot lining work at locations to be determined throughout San Francisco.

Project Manager:

John Wong

Page 3 of 10 ends

Contract Number and Title:

WW-787, Various Locations Main Sewer Inspection No. 4 and Spot Lining Contract Estimate:
$11,000,000
Program:

SFPUC Wastewater Enterprise, R&R Program
Estimated Date of Advertisement:

July 2026
Description of Contract Work:

Contract work consists of sewer camera inspection and spot lining work at various locations throughout San Francisco.

Project Manager:

John Wong

Contract Number and Title:

WW-796, Various Large Diameter Brick Sewer Improvement
Contract Estimate:
$21,500,000
Program:

SFPUC Wastewater Enterprise, R&R Program
Estimated Date of Advertisement:

July 2026
Description of Contract Work:

The purpose of the project is to rehabilitate and/or replace approximately 9,000 linear feet of existing sewers, and associated manholes along sewer segments on Lombard Street, Greenwich Street, Taylor Street, Jackson Street, 1st Street, 4th Street, Mission Street, Jessie Street, Minna Street, Natoma Street, Tehama Street, Guerrero Street, Harrison Street, Lake Street, 14th Avenue, California Street, Anza Street, 6th Avenue and 10th Avenue. The sewers are constructed of brick materials, egg-shaped, and are generally 3-foot wide by 5-foot high in size. Rehabilitation will be via the cured-in-place liner (CIPL) method. Other work includes: traffic control, and pavement restoration work.

Project Manager:

Carman Luk

Page 4 of 10 ends

Professional Service:

Contract Number and Title:

PRO.0295, Water Supply and Treatment Division (WSTD) Technical Services for Pipeline and Tunnel Inspection and Repair Program
Contract Estimate:
$9,000,000
Program:

Water Enterprise
Estimated Date of Advertisement:

July 2026
Description of Contract Work:

SFPUC seeks to retain the services of a qualified Proposer to provide support to the Regional Water System’s Pipeline and Tunnel Inspection and Repair Renewal and Replacement Program. The contract will analyze the water transmission system to understand operations, failure mechanisms, and how to inspect/assess, maintain, and perform work on the asset, which must remain partially in service to meet water level of service goals defined by SFPUC Water System Improvement Program. The Contractor will support the WSTD staff efforts to understand failure mechanisms, perform comprehensive condition assessment, recommend monitoring programs, and repair and replacement strategies. The Contractor will also provide technical support for condition assessment of steel pipe, non-steel pipe, and tunnels utilizing current and available inspection technologies.

Project Manager:

Eric Choi

Contract Number and Title:

PRO.0355, As-Needed Geotechnical Engineering Services
Contract Estimate:
$6,000,000
Program:

Infrastructure
Estimated Date of Advertisement:

June 2026
Description of Contract Work:

SFPUC seeks to retain the services of qualified Proposers to provide as- needed geotechnical engineering services to support the planning, design, and construction of various SFPUC water, wastewater, and power infrastructure projects. Services may include field investigations, laboratory testing, geotechnical engineering analysis, preparation of design criteria, hazard assessment, and other specialized geotechnical services.

Project Manager:

Stephanie Wong

Page 5 of 10 ends

Competitive Selection Process Communications Policy
Restricted Communications Period Report
The following competitive solicitations are published and are within the Restricted Communications Period under the Public Utilities Commission Competitive Selection Process
Communications Policy
1:

Program Contract No. Title Publication
Date
Infrastructure PRO.0355 As-Needed Geotechnical
Engineering Services April 28, 2026
Water Enterprise PRO.0295
WSTD Technical Services for
Pipeline and Tunnel
Inspection and Repair
Program
April 28, 2026
SFPUC Wastewater
Enterprise, R&R
Program
WW-796 Various Large Diameter Brick
Sewer Improvement April 28, 2026
SFPUC Wastewater
Enterprise, R&R
Program
WW-787
Various Locations Main Sewer
Inspection No. 4 and Spot
Lining
April 28, 2026
SFPUC Wastewater
Enterprise, R&R
Program
WW-786 As-Needed Sewer Inspection
(FY26) and Spot Lining April 28, 2026
SFPUC Wastewater
Enterprise, R&R
Program
WW-764 Various Locations Sewer
Replacement No. 22 April 28, 2026
Water Enterprise DB-142 525 Golden Gate On-Site
Non-Potable Water System April 28, 2026
SFPUC Wastewater
Enterprise, R&R
Program
WW-799 As-Needed Large Diameter
Sewer Inspection No. 1 April 14, 2026

1 On February 9, 2021, by Resolution No. 21-0022, the San Francisco Public Utilities Commission adopted a Competitive Selection Process Communications Policy. The policy establishes a Restricted Communications Period. The period starts immediately upon the publication of a Request for Qualifications, Request for Proposals, Request for Bids, Advertisement for Bids, or any other type of competitive solicitation for a contract or lease.

The period ends when the Commission awards the contract or lease or terminates the competitive process.

Page 6 of 10 ends

Program Contract No. Title Publication
Date
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2919
8- and 12-Inch Ductile Iron
Water Main Replacement and
Rehabilitation, Sewer
Replacement and
Rehabilitation, and Pavement
Renovation on 18th and
Mariposa Streets from Potrero
Ave. to Texas St. and on
Various Side Streets
April 14, 2026
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2918
8-Inch Ductile Iron Water
Main Replacement and Sewer
Replacement and
Rehabilitation on Harkness
Ave., Goettingen St., Brussels
St., Girard St., and Various
Locations
April 14, 2026
Water Capital
Improvement Program WD-2917
Harry Tracy Water Treatment
Plant Equipment Protection
Upgrades
April 14, 2026
Water Capital
Improvement Program WD-2914
Bay Division Pipelines Nos. 1
through 4 Lining and As-
Needed Pipeline Repairs
April 14, 2026
N/A JOC-118
Electrical (C-10 License)
Construction, San Francisco,
San Mateo, Santa Clara, and
Alameda Counties
April 14, 2026
N/A JOC-117
General Building (B-License)
Construction, San Francisco,
San Mateo, Santa Clara, and
Alameda Counties
April 14, 2026
Infrastructure Division
Project Management PRO.0339(R) Power Capital Program
Management (Re-Bid) March 24, 2026
Infrastructure PRO.0317(R) As-Needed Safety Pre-
Qualification Consultant March 24, 2026
Sewer System
Improvement Program WW-797 Griffith Dry-Weather Force
Main Rehabilitation March 24, 2026
Hetchy Capital
Improvement Program HH-1024 O’Shaughnessy Camp Utility
Upgrades March 24, 2026

Page 7 of 10 ends

Program Contract No. Title Publication
Date
SFPUC Wastewater
Enterprise, Renewal and
Replacement (R&R)
Program
WW-765 Various Locations Sewer
Replacement No. 23 March 10, 2026
Water Enterprise Capital
Improvement Program WD-2932
Cathodic Protection for
Transmission Pipelines at
Various Locations, Phase 3
March 10, 2026
Water Enterprise Local
Conveyance/Distribution
System Program
WD-2877
As-Needed Ductile Iron Water
Main Replacement at Various
Locations – No. 3
March 10, 2026
N/A PW-013
As-Needed Electrical
Transmission/Distribution,
Installation, and Construction
Support No. 2
March 10, 2026
N/A JOC-116
General Engineering (A-
License) Construction, San
Joaquin, Stanislaus, and
Tuolumne Counties, Hetch
Hetchy
March 10, 2026
Hetchy Capital
Improvement Program HH-1020 Moccasin Dam and Reservoir
Long-Term Improvements March 10, 2026
Sewer System
Improvement Program DB-140
Southeast Water Pollution
Control Plant – Secondary
Clarifiers Rehabilitation
March 10, 2026
Wastewater Enterprise
Capital Improvements
Program
DB-136 Wastewater Facilities Security
Enhancements March 10, 2026
Wastewater Enterprise WW-770 Oceanside Water Pollution
Control Plant HVAC Upgrades
February 24,
2026
Wastewater Enterprise WW-766
Oceanside Water Pollution
Control Plant 930
Administration and Lab
Structure Health and Safety
Improvements
February 24,
2026
Wastewater Enterprise WW-745
Oceanside Water Pollution
Control Plant Solids
Thickening Process Upgrade
February 24,
2026
Sewer System
Improvement Program WW-668 Upper Yosemite Creek
Daylighting Project
February 24,
2026

Page 8 of 10 ends

Program Contract No. Title Publication
Date
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2780
8-Inch Ductile Iron Water
Main Replacement and Sewer
Replacement on 21st St. from
Eureka St. to Church St. and
on Hill St. from Castro St. to
Church St. and Various Side
Streets
February 24,
2026
Water Enterprise Local
Water Capital
Improvement Program
WD-2931 Harding Park Pump Station February 10,
2026
Water Enterprise Local
Conveyance/Distribution
System Program -
Wastewater Enterprise
Renewal and
Replacement Program
WD-2922
8-inch Ductile Iron Water
Main Replacement on Lincoln
Way and Irving St from
Sunset Blvd to 19th Ave and
Various Side Streets
February 10,
2026
Local Water Capital
Improvement Program
– Local Water
Conveyance/Distribution
System Program
WD-2885
8-Inch Ductile Iron Water
Main Replacement, Sewer
Replacement, and Paving
Renovation on Fulton St. from
Great Highway to 31st Ave.
and on Various Side Streets
February 10,
2026
N/A JOC-114
General Engineering (A-
License) Construction, San
Francisco, San Mateo, Santa
Clara, and Alameda Counties
February 10,
2026
Urban Watershed
Planning PRO.0319 Urban Watershed Planning,
Programs & Policy
January 27,
2026
SFPUC Wastewater
Enterprise, Renewal and
Replacement Program
WW-785 As-Needed Spot Sewer
Replacement No. 49
January 27,
2026
N/A WW-782
Wastewater Enterprise
Elevator Maintenance, Repair,
and Modernization 2026-2030
January 27,
2026
Hetch Hetchy Water &
Power HH-1019 2023 Storm Damage
Remaining Road Repairs
January 27,
2026
Hetch Hetchy Capital
Improvement Program DB-139R
Transmission Line Clearance
Mitigation Moderate and Low
Risk
January 27,
2026

Page 9 of 10 ends

Program Contract No. Title Publication
Date
SFPUC Wastewater
Enterprise, Renewal and
Replacement Program
WW-788 Various Large Diameter
Sewer Inspection No. 3
January 13,
2026
Water Capital
Improvement Program WD-2930B Master-As-Needed Peninsula Watershed Improvements
January 13,
2026
Water Capital
Improvement Program WD-2930A Master-As-Needed Alameda
Watershed Improvements
January 13,
2026
Hetch Hetchy Water and
Power 10-year Capital
Improvement Project
PRO.0347 As-Needed HHWP Engineering
Services
December 09,
2025
San Francisco Public
Utilities Commission
Local Water System
PRO.0346 As-Needed Curb Ramp
Engineering Design Services
December 09,
2025
Water Capital
Improvement Program WD-2915 Crystal Springs Pipeline No. 2 Reach 5 Lining Replacement
December 09,
2025
Hetchy Capital
Improvement Project
under the Water Capital
Program
PRO.0343
Hetchy Capital Improvement
Projects As-Needed
Construction Management
and Staff Augmentation
Services
November 10,
2025
Wastewater Capital WW-756
Lower Alemany Area
Stormwater Improvements
Project
November 10,
2025
Environmental
Management Group PRO.0333 As-Needed Environmental
Review
October 14,
2025
Infrastructure Division PRO.0337
As-Needed Electrical and
Mechanical Engineering
Services
September 23,
2025
Water Enterprise PRO.0336 Specialized and Technical As- Needed Services
September 23,
2025
Power Enterprise PRO.0234 CleanPowerSF In-City Solar September 23, 2025
Power Enterprise PRO.0223(R) 2025 Disadvantaged
Communities Green Tariff
September 23,
2025
SFPUC Wastewater
Enterprise, Renewal and
Replacement (R&R)
Program
WW-784 As-Needed Spot Sewer
Replacement No. 48
September 23,
2025

Page 10 of 10 ends

Program Contract No. Title Publication
Date
Local Water Main
Replacement Program WD-2920
Water Main and Sewer
Replacement On Moraga,
Noriega, and Ortega Streets
From 8th to 11th Ave. and
Various Side Streets
September 23,
2025
Hetch Hetchy Power PW-014 As-Needed Solar Services September 23, 2025
SFPUC Wastewater
Enterprise, Sewer
System Improvement
Program
WW-780
Pump Station Security
Upgrades Cesar Chavez Pump
Station (CCS), Griffith Pump
Station (GFS), Channel Pump
Station (CHS), Merlin Morris
Pump (MMS)
February 25,
2025
Infrastructure PRO.0323 Government Procurement
Software
February 11,
2025
Sewer System
Improvement Program WW-719B
Folsom Area Stormwater
Improvements – Alameda
Street Wet Weather
Conveyance Tunnel
September 10,
2024
Power Enterprise PRO.0280 2024 CleanPowerSF
Renewable Energy Supplies June 25, 2024

← All documents from this meeting