AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

DEPARTMENT: Infrastructure Division

AGENDA NUMBER: 7e
MEETING DATE: June 23, 2026
Calendar: Consent Calendar
Project Manager: Brian Carlomagno

Award Contract No. WW-766, Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements

Summary of Proposed
Commission Action:

Award Contract No. WW-766, Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements, to the responsible bidder that submitted the lowest responsive bid, Blocka Construction , Inc., in the amount of $3,387,000 and with a duration of 790 consecutive calendar days (approximately two year and two months), to improve health and safety conditions related to 930 Administration and Lab Structure in the Oceanside Water Pollution Control Plant.

Background: The San Francisco Public Utilities Commission (SFPUC) Wastewater Enterprise Oceanside Water Pollution Control Plant (OSP) provide s wastewater treatment for the Westside of San Francisco, and discharges treated effluent to the Pacific Ocean via the Southwest Ocean Outfall. The laboratory at OSP serves a critical function for SFPUC to monitor and test plant-treated effluent water quality discharged into the ocean, in compliance with regulatory permit requirements.

The existing laboratory fume hood ventilation systems at OSP laboratory were built in the 1990s and are at the end of their useful life. The contract will provide equipment replacements and system improvements to ensure operation of the laboratory exhaust ventilation systems, and ensure staff are protected from chemical fumes during testing.

Scope of Contract: The contract work locatio n is at the Oceanside Water Pollution Control Plant in the City and County of San Francisco.

The contract work consists of:
• Replacement of seven laboratory fume hoods and
appurtenances;
• Removal of one canopy and installation of one fume hood and associated casework replacement;

• Selective casework demolition, flooring repair, gypsum board wall repair, paint and soffits, existing cabinet and Agenda Title: WW-766, Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements Commission Meeting Date: June 23, 2026

Page 2 ends

countertop repair, acoustical metal pane and acoustical tile ceiling repair;
• Installation of six isolation duct dampers;
• Replacement of related supply and exhaust fans and
ductwork;
• Replacement of related plumbing system; and
• Replacement of related electrical system.

Funding and Costs: Funding Source: Project No. 10037735, Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements
Engineer’s Estimate: $5,867,000
Award: $3,387,000

Schedule: Estimated Notice-to-Proceed Date: October 2026 Estimated End Date: December 2028
Duration: 790 consecutive calendar days consecutive calendar days (730 consecutive calendar days to Substantial Completion and 60 consecutive calendar days to Final Completion)

Bid History:

Advertised: March 13, 2026

Bids Received: On April 16, 2026, SFPUC received sealed bids from five firms.

Bid Rank Bid Amount Bid
Preference
Compensable
Delay (75
days duration)
Adjusted Bid Final
Rank

1. Blocka
Construction, Inc. $3,387,000.00 Not Eligible $500.00 $3,424,500.00 1

2. Rodan Builders,
Inc. $5,318,000.00 Not eligible $500.00 $5,355,500.00 2

3. Buhler
Commercial $5,683,329.00 10% $1,000.00 $5,182,496.10 3

4. Rubecon
General
Contracting, Inc.
$6,202,059.00 10% $2,000.00 $5,716,853.10 4

5. Cal State
Constructors,
Inc.
$6,914,000.00 10% $100.00 $6,229,350.00 5

Application of bid preferences in accordance with Chapter 14B of the San Francisco Administrative Code did not change the final ranking of the low bidder.

Because the SFPUC anticipates that potential unforeseen conditions or other factors outside the contractor’s control may impact the schedule, Staff included a requirement in the Invitation Agenda Title: WW-766, Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements Commission Meeting Date: June 23, 2026

Page 3 ends

for Bids for bidders to provide a daily compensable time extension rate. At the bid opening, Staff announced that SFPUC would use the value of 75-
days to calculate the compensable delay bid
adjustment amount. Staff used the daily rate in each bid to determine the total Compensable Delay value shown in the table above by multiplying the bidder’s daily rate times 75. The Adjusted Bid value in the table above is the sum of the Base Bid Amount and Compensable Delay less any applicable bid discount. Staff used the Adjusted Bid value to compare and rank the bids to determine the lowest bidder. However, the contract award amount is the Base Bid value (not the Adjusted Bid value) and, if the Commission awards the contract, the bidder’s daily compensable delay rate will become a term of the contract.

Environmental
Review:

This action does not constitute a project under the California Environmental Quality Act Guidelines Section 15378 because it will not result in a physical change in the environment.

Local Business
Enterprise Utilization
and Non-
Discrimination in
Contracting:

The Contract Monitoring Division established a 20% Local Business Enterprise (LBE) subcontracting requirement for this contract. The contractor committed to a 20.47% LBE subcontractor participation with its bid submittal.

Attachment(s): 1. Contract Monitoring Division Memorandum Agenda Title: WW-766, Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements Commission Meeting Date: June 23, 2026

Page 4 ends

Location Map

This location map illustrates the project site at 3500 Great Highway, which is identified by a photo of the Oceanside Treatment Plant at the site location enclosed by a red circle.

Oceanside Water Pollution Control Plant
3500 Great Highway
San Francisco, CA 94132

PUBLIC UTILITIES COMMISSION
City and County of San Francisco
RESOLUTION NO. __________________

WHEREAS, The San Francisco Public Utilities Commission (SFPUC) Oceanside Water Pollution Control Plant (OSP) provides wastewater treatment for the Westside of San Francisco and discharges all treated effluent to the Pacific Ocean via the Southwest Ocean Outfall. The laboratory at OSP serves a critical function for SFPUC to monitor and test plant-treated effluent water quality discharged into the ocean , in compliance with regulatory permit requirements; and

WHEREAS, On March 13, 2026 , SFPUC advertised Contract No. WW-766, Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements; and

WHEREAS, The Engineer’s Estimate was $5,867,000 for this construction work to improve the health and safety conditions related to 930 Administration and Lab Structure, through selective demolition, structural support to mechanical/HVAC equipment and systems, laboratory fume hood replacement and ventilation system modifications, electrical conduit, wires, panels and devices; and

WHEREAS, The contract duration is 790 consecutive calendar days; and

WHEREAS, On April 16, 2026, SFPUC received and publicly opened five bids; and

WHEREAS, SFPUC staff and the Contract Monitoring Division (CMD) review ed the bids and the application of bid preferences and have determined that Blocka Construction, Inc., is the responsible bidder with the lowest responsive bid; and

WHEREAS, The Contract Monitoring Division established a Local Business Enterprise (LBE) subcontracting participation of 20% for this contract, and the contractor committed to an LBE subcontractor participation of 20.47% with its bid submittal; and

WHEREAS, This action does not constitute a project under the California Environmental Quality Act Guidelines Section 15378 because it will not result in a physical change in the environment; and

WHEREAS, Funds are available from Project No. 10037735, Admin Bldg. (OSP 930) Health Safety Improvements; now, therefore, be it

RESOLVED, That this Commission hereby awards Contract No. WW-766, Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements , in the amount of $3,387,000.00, and with a duration of 790 consecutive calendar days, to the responsible bidder that submitted the lowest responsive bid, Blocka Construction, Inc.

I hereby certify that the foregoing resolution was adopted by the San Francisco Public Utilities Commission at its meeting of June 23, 2026.

__________________________________
Director of Commission Affairs
San Francisco Public Utilities Commission

City & County of San Francisco
Daniel Lurie, Mayor
Office of the City Administrator
Carmen Chu, City Administrator

Contract Monitoring Division
Regina Chan, Director

MEMORANDUM

Date: May 8, 2026

To:

Brian Carlomagno, SFPUC
Erica Liang, SFPUC

From: Jovi Cuntapay-Vitin on behalf of Adriana Duran, Contract Monitoring Division

Subject:

CMD Review of Bids Submitted on April 16, 2026 for WW-766 Oceanside Water Pollution Control Plant 930 Administration and Lab Structure Health and Safety Improvements

**Note to SFPUC -- Please use the tables with the blue headers for your Peoplesoft project team entry.

Bids and Bid Discount

Blocka Construction, Inc. is the apparent low bidder after the bid discount.

The bid discount was applied to bidders who are certified by the Contract Monitoring Division, (“CMD”) as an LBE in the type of work that is specified for the bidder by the Contract Awarding Authority.

Bidder LBE Status,
Type and Size Base Bid
Compensable
Delay
(75 days)
Bid
Discount
Adjusted Bid
with
Bid Discount and
Compensable
Delay
Blocka
Construction, Inc. Non-LBE $3,387,000.00 $37,500.00 Not eligible $3,424,500.00
Rodan Builders,
Inc. Non-LBE $5,318,000.00 $37,500.00 Not
eligible $5,355,500.00
Buhler
Commercial

SF LBE-OBE
(Micro) $5,683,329.00 $75,000.00 10% $5,182,496.10
Rubecon General
Contracting, Inc.

SF LBE-MBE
(Small) $6,202,059.00 $150,000.00 10% $5,716,853.10
Cal State
Constructors, Inc.

SF LBE-OBE
(Micro) $6,914,000.00 $7,500.00 10% $6,229,350.00

LBE Subcontracting Participation Requirement

Blocka Construction, Inc. satisfactorily demonstrated how they will meet the LBE subcontractor participation requirement.

A combination of Micro-LBE and Small-LBE participation will count toward LBE subcontractor participation compliance. Blocka Construction, Inc.’s commitment for this contract:

Requirement
%
Commitment
%
Micro/Small
LBE 20.00% 20.47%

In their bid, Blocka Construction, Inc. listed the following subcontractors on this contract.

Supplier Name Scope of Work

LBE

LBE
Size

LBE
Percent

Percent
Of
Work
Amount
Apex Testing Lab Testing SF LBE-
MBE SML 100% 0.29% $9,716.00
Marinship
Development
Demo and Concrete SF LBE-
MBE SML 100% 2.95% $100,000.00
Leyder Electric Partial Electrical SF LBE-
MBE MICRO 100% 2.21% $75,000.00
Bullards Heating and
Air
Partial HVAC SF LBE-
OBE MICRO 100% 6.64% $225,000.00
Larratt Bros.

Plumbing
Plumbing SF LBE-
OBE SML 100% 8.37% $283,500.00

Farwest Insulation
Contracting Insulation Non-LBE 0.85% $28,790.00
Air Doctor Duct Cleaning Non-LBE 1.99% $67,250.00

“Good Faith Efforts” Requirement

Blocka Construction, Inc. satisfied the “Good Faith Efforts” requirement.

Blocka Construction, Inc. utilized Approach B by subcontracting with Micro-LBE firm: Apex Testing Laboratories, Inc.

CMD Determination

CMD finds Blocka Construction, Inc. is responsive to pre-award requirements of Chapter 14B. Once awarded, the contract will be monitored for compliance with the LBE subcontractor participation commitment, as well as other 14B requirements.

Primary CMD contact for the contract: Adriana Duran, [email protected]

CMD must be contacted immediately for:
- Subcontractor addition/substitution;
- Contract modification that cumulatively increases the original contract value by 20%; - Prompt payment issues;
- Any other issues pertaining to LBE subcontractor participation

Noncompliance may result in penalties, including monetary fines. Please communicate with CMD early.