Award Contract No. WD-2885, 8-Inch Ductile Iron Water Main Replacement , Sewer Replacement, and Paving Renovation on Fulton St. from Great Highway to 31st Ave. and on Various Side Streets
Summary of
Proposed
Commission
Action:
Award Contract No. WD-2885, 8 -Inch Ductile Iron Water Main Replacement, Sewer Replacement , and Paving Renovation on Fulton Street from Great Highway to 31st Avenue and on Various Side Streets, to the responsible bidder that submitted the lowest responsive bid, KJ Woods Construction, Inc., in the amount of $9,888,000 and with a duration of 630 consecutive calendar days (approximately one year and eight months), to install water mains and sewer lines in the Outer Richmond neighborhood of San Francisco. The Planning Department has determined that the Project is exempt from the California Environmental Quality Act (CEQA), and the Commission will rely on that determination to make its decision on this action. This action constitutes the Approval Action for the Project for the purposes of the CEQA pursuant to San Francisco Administrative Code Section 31.04(h).
Background: The water main installation work under this contract is part of the San Francisco Public Utilities Commission (SFPUC) Water Enterprise Local Conveyance/Distribution System Program. The program includes the replacement of pipes that have either been damaged or are at the end of their useful service life, to ensure reliable water delivery within the City and County of San Francisco. B etween 1917 and 1936, t
he City installed the
existing 4- to 8-inch cast iron water mains scheduled to be replaced under this contract. Due to the advanced age of the pipes (between 90 to 109 years), material, and history of repeated main breaks in the neighborhood, SFPUC has prioritized their replacement.
This contract also includes a
sewer line replacement component in the same work area.
Scope of
Contract:
The contract work location is in the Outer Richmond neighborhood in the City and County of San Francisco.
The contract work consists of:
• Installing 12,500 feet of 4- to 8 -inch diameter ductile iron water conveyance pipe;
• Installing ancillary water service pipe;
Agenda Title: WD-2885, 8-Inch Ductile Iron Water Main Replacement and Sewer Replacement, and Paving Renovation on Fulton St. from Great Highway to 31st Ave. and on Various Side Streets.
Commission Meeting Date: September 8, 2026
• Installing 42 feet of sewer pipe;
• Lining 631 feet of sewer pipe;
• Slip lining 549 feet of sewer pipe;
• Constructing curb ramps, bus pads; and
• Performing pavement restoration
Funding and
Costs:
Funding Source: Project No. 10037742, SFPUC Water Enterprise Local Conveyance/Distribution System Program, SFPUC Wastewater Renewal and Replacement Program
Engineer’s Estimate: $12,100,000
Award: $9,888,000
DEPARTMENT FUNDING SOURCE AMOUNT
SFPUC: Water
Enterprise Local Conveyance / Distribution System Program $8,689,506 SFPUC: Wastewater
Enterprise Renewal and Replacement $1,114,598
San Francisco Public
Works: Roadway Street Resurfacing Program $83,896
Contract Total: $9,888,000
Schedule: Estimated Notice-to-Proceed Date: February 2027 Estimated End Date: November 2028
Contract Duration: 630 consecutive calendar days (585 consecutive calendar days to Substantial Completion and an additional 45 consecutive calendar days to Final Completion).
Bid History:
Advertised: June 2, 2026
Bids Received: On July 9, 2026, SFPUC received eleven sealed bids:
Bid Rank Bid Amount Bid
Preference
Adjusted Bid Final Rank
1. Westland
Contractors, Inc. $9,774,273.00 2.00% $9,578,787.54 Withdrawn
2. KJ Woods
Construction Inc. $9,888,000.00 N/A $9,888,000.00 1
3. Bassett Engineering $10,585,034.00 2.00% $10,373,333.32 2
4. Koios Engineering,
Inc. $10,893,969.00 2.00% $10,676,089.62 3
5. Mitchell Engineering $11,427,665.50 2.00% $11,199,112.19 4
6. M Squared
Construction, Inc. $11,449,408.00 2.00% $11,220,419.84 5
7. NTK Construction,
Inc. $12,192,456.00 2.00% $11,948,606.88 6
Agenda Title: WD-2885, 8-Inch Ductile Iron Water Main Replacement and Sewer Replacement, and Paving Renovation on Fulton St. from Great Highway to 31st Ave. and on Various Side Streets.
Commission Meeting Date: September 8, 2026
8. A. Ruiz Construction
Co. & Assoc., Inc $12,941,550.10 2.00% $12,682,719.10 7
9. Cratus, Inc. $13,470,333.50 N/A $13,470,333.50 8
10. JMB Construction,
Inc. $14,301,985.00 N/A $14,301,985.00 9
11. Mountain Cascade,
Inc. $17,895,170.00 N/A $17,895,170.00 10
Application of bid preferences in accordance with Chapter 14B of the San Francisco Administrative Code did not change the final ranking of the low bidder.
The apparent low bidder, Westland Contractors, Inc., formally withdrew its bid on July 14, 2026. Staff then determined that KJ Woods Construction, Inc., is the responsible bidder that submitted the lowest responsive bid.
Environmental
Review:
On August 17, 2026, the Planning Department determined the Project to be categorically exempt from environmental review under CEQA Guidelines Section 15302, Class 2 (Replacement or Reconstruction) and Section 15303, Class 3 (New Construction or Conversion of Small Structures) (Case No. 2025- 005658ENV). View the exemption determination.
This action constitutes the Approval Action for the Project for the purposes of the CEQA pursuant to San Francisco Administrative Code Section
31.04(h).
Local Business
Enterprise
Utilization and
Non-
Discrimination
in Contracting:
The Contract Monitoring Division (CMD) established a 20% Local Business Enterprise (LBE) subcontracting requirement for this contract. The contractor committed to a 28.72% LBE subcontractor participation with its bid submittal.
Attachment(s): CMD Memorandum
Agenda Title: WD-2885, 8-Inch Ductile Iron Water Main Replacement and Sewer Replacement, and Paving Renovation on Fulton St. from Great Highway to 31st Ave. and on Various Side Streets.
Commission Meeting Date: September 8, 2026
WD-2885 Vicinity Map
WD-2885 Detailed Location Map
PUBLIC UTILITIES COMMISSION
City and County of San Francisco
RESOLUTION NO.
WHEREAS, The San Francisco Public Utilities Commission (SFPUC) Water Enterprise Local Conveyance/Distribution Program provides for the replacement of water distribution pipes that are at the end of their useful service life to ensure a reliable water delivery system within the City and County of San Francisco; and
WHEREAS, On June 2, 2026, SFPUC advertised Contract No. WD-2885, 8-Inch Ductile Iron Water Main Replacement and Sewer Replacement , and Paving Renovation on Fulton Street from Great Highway to 31
st Avenue and on Various Side Streets; and
WHEREAS, The Engineer’s Estimate is $12,100,000 for this construction work to install approximately 12,000 feet of ductile iron water conveyance pipe and ancillary water service pipe, 42 feet of sewer pipe, 631 feet of sewer lining, 549 feet of slip lining, curb ramps, bus pads, and perform complete pavement restoration, in the Outer Richmond neighborhood in the City and County of San Francisco; and
WHEREAS, The contract duration is 630 consecutive calendar days; and
WHEREAS, On July 9, 2026, SFPUC received and publicly opened eleven bids; and
WHEREAS, On July 14 , 2026, bidder Westland Contractors, Inc. , formally withdrew its bid; and
WHEREAS, SFPUC staff and the Contract Monitoring Division (CMD) review ed the bids and the application of bid preferences and have determined that KJ Woods Construction Inc., is the responsible bidder with the lowest responsive bid; and
WHEREAS, The CMD established a 20% Local Business Enterprise (LBE) subcontracting requirement for this contract, and the contractor committed to 28.72% LBE subcontractor participation in its bid submittal; and
WHEREAS, On August 17, 2026, the Planning Department determined the Project to be categorically exempt from environmental review under the California Environmental Quality Act Guidelines Section 15302, Class 2 (Replacement or Reconstruction) and Section 15303, Class 3 (New Construction or Conversion of Small Structures) (Case No. 2025-0005658ENV); and
WHEREAS, Funds are available from Project No. 100 37742, SFPUC Local Conveyance/Distribution System Program , Wastewater Enterprise Renewal and Replacement Program; now, therefore, be it
RESOLVED, That this Commission hereby awards Contract No. WD-2885, 8-Inch Ductile Iron Water Main Replacement and Sewer Replacement , and Paving Renovation on Fulton Street from Great Highway to 31st Avenue and on Various Side Streets, in the amount of $9, 888,000, and with a duration of 630 consecutive calendar days , to the responsible bidder that submitted the lowest responsive bid, KJ Woods Construction, Inc.
I hereby certify that the foregoing resolution was adopted by the San Francisco Public Utilities Commission at its meeting of September 8, 2026.
__________________________________
Director of Commission Affairs
San Francisco Public Utilities Commission
City & County of San Francisco
Daniel Lurie, Mayor
Office of the City Administrator
Carmen Chu, City Administrator
Contract Monitoring Division
Regina Chan, Director
MEMORANDUM
Date: August 11, 2026
To: Jeremy Brooks, PUC
Cynthia Morell, PUC
Jon Cantu, PUC
From: Adriana Duran, on behalf of Jim Oerther, CMD
Subject: REVISION 2—CMD Review of Bids Submitted on 7/9/2026 for WD-2885 8-Inch Ductile Iron Water Main Replacement, Sewer Replacement, and Paving Renovation on Fulton St. from Great Highway to 31
st Ave. and on Various Side
Streets
Westland Contractor’s Inc. is the apparent low bidder after the bid discount.
The bid discount was applied to bidders who are certified by the Contract Monitoring Division (“CMD”), as an LBE in the type of work that is specified for the bidder by the Contract Awarding Authority. [Sec. 14B.7(D)]
Bidder
LBE Status,
Type and
Size
Base Bid
Bid Discount
Adjusted Bid
with
Bid Discount
Westland Contractors,
Inc.
SF LBE
(Micro)
$9,774,273.00 2.00% $9,578,787.54
KJ Woods
Construction, Inc.
Non-LBE $9,888,000.00 Not eligible $9,888,000.00
Basset Engineering SF LBE
(Micro)
$10,585,034.00 2.00% $10,373,333.32
Koisos Engineering,
Inc.
SF LBE
(Micro)
$10,893,696.00 2.00% $10,676,089.62
Mitchell Engineering SF LBE
(Small)
$11,427,665.50 2.00% $11,199,112.19
M Squared
Construction, Inc.
SF LBE
(Small)
$11,449,408.00 2.00% $11,220,419.84
NTK Construction, Inc. SF LBE
(Small)
$12,192,456.00 2.00% $11,948,606.88
A. Ruiz Construction
Co. & Assoc., Inc.
SF LBE
(Micro)
$12,941,550.10 2.00% $12,682,719.10
Cratus, Inc. Non-LBE $13,470,333.50 Not Eligible $13,470,333.50 JMB Construction, Inc. Non-LBE $14,301,985.00 Not Eligible $14,301,985.00 Mountain Cascade,
Inc.
Non-LBE $17,895,170.00 Not Eligible $17,895,170.00
KJ Woods Construction, Inc. (“KJ”) is the lowest responsive and responsible bidder because Westland Contractors, Inc. withdrew their bid on 7/14/2026.
KJ satisfactorily demonstrated how they will meet the LBE subcontractor participation requirement.
A combination of Micro-LBE and Small-LBE participation will count toward LBE subcontractor participation compliance. KJ’s commitment for this contract:
Requirement % Commitment %
Micro/Small LBE 20.00% 28.72%
In their bid, KJ listed the following subcontractors on this contract.
Supplier Name Scope of Work
LBE
LBE
Size
LBE
Percent
Percent
Of
Work
Amount
Camajani Trucking Trucking
SF LBE
MICR
100%
3.00% $300,000
Golden State
Construction &
Utility, Inc
Partial Excavation SF LBE MICR 100% 15.17% $1,500,000
DR Traffic Control Traffic Control -
Partial SF LBE MICR 100% 0.40% $40,000
QA Constructors,
Inc.
2” Grind and
Overlay SF LBE MICR 100% 10.11% $1,000,000
SAK Construction
LLC CIPP Lining 4.76% $471,052
KJ satisfied the “Good Faith Efforts” requirement.
KJ utilized Approach A and exceeded the LBE subcontractor participation requirement by 35%.
CMD finds KJ is responsive to pre-award requirements of Chapter 14B. Once awarded, the contract will be monitored for compliance with the LBE subcontractor participation commitment, as well as other 14B requirements.
Primary CMD contact for the contract: Adriana Duran, [email protected]
CMD must be contacted immediately for:
- Subcontractor addition/substitution;
- Contract modification that cumulatively increases the original contract value by 20%; - Prompt payment issues;
- Any other issues pertaining to LBE subcontractor participation