AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

DEPARTMENT: Infrastructure Division

AGENDA NUMBER: 9i _____
MEETING DATE: October 13, 2026
Calendar: Consent Calendar
Contract/Project Manager: Joey Yan

Award Contract No. DB-136, Wastewater Facilities Security Enhancements

Summary of Proposed
Commission Action:

Award Contract No. DB-136, Wastewater Facilities Security Enhancements, to the sole, qualified, responsible, and responsive proposer, Cupertino Electric, Inc., to design and construct security enhancements at S an Francisco Public Utilities Commission Wastewater Enterprise facilities in accordance with San Francisco Administrative Code section 6.23(c)( 2), with an initial award for design and pre-construction services in the not-to-exceed amount of $7,072,108, and with a total contract duration of 730 consecutive calendar days (approximately two years). The Planning Department has determined that the Project is exempt from the California Environmental Quality Act (CEQA), and the Commission will rely on that determination to make its decision on this action. This action constitutes the Approval Action for the Project for the purposes of the CEQA pursuant to San Francisco Administrative Code Section

31.04(h).

Background: In 2017, the San Francisco Public Utilities Commission (SFPUC) performed a security evaluation to identify the security risks towards Wastewater Enterprise facilities, assets, staff, and operations from outside malevolent acts. As part of the Health, Safety, and Security level-of service goal, security measures were recommended to enhance protect ion of staff, assets, and facilities at the following sites included in the scope of this project: Southeast Water Pollution Control Plant, Islais Creek (Booster) Pump Station , Bruce Flynn Pump Station, North Point Facility, North Shore Pump Station, Oceanside Water Pollution Control Plant, and Westside Pump Station.

The General Manager approved the project delivery method of Best Value Progressive Design-Build for this project based on costs and schedule savings . Contract No. DB -136, Wastewater Facilities Security Enhancements, provides design and construction services to implement security enhancements across Wastewater
Enterprise facilities.

The initial recommended contract award is for the Design-Builder to proceed with design, pre-construction services, and to prepare the Target Value Design Cost Model and Trade Package Plan (as Agenda Title: DB-136, Wastewater Facilities Security Enhancements Commission Meeting Date: October 13, 2026

Page 2 ends

defined in the contract), to allow the design to be progressively developed into individual work trade packages and allow for any pre-construction services to commence such as utility and field conditions verification, site assessments, hazardous material investigations, geotechnical investigations, and site surveys to optimize the cost, schedule, and quality of the project while reducing the risk of cost and schedule changes during construction.

Under the Progressive Design-Build procedure, the award of this contract would be Action 1. As the pre-construction work progresses, we will return to the Commission with additional actions for approval.

If the Commission approves the project upon completion of the Target Value Design Cost Model and Trade Package Plan, and authorizes the project to proceed, the Design -Builder will proceed with construction services.

Scope of Contract: The contract work locations include Wastewater Facilities throughout the City and County of San Francisco: Southeast Water Pollution Control Plant, Islais Creek (Booster) Pump Station, Bruce Flynn Pump Station, North Point Facility, North Shore Pump Station, Oceanside Water Pollution Control Plant, and Westside Pump Station.

The contract work consists of security upgrades, including:
• fencing and gates,
• cameras,
• lighting,
• card readers and door contacts,
• intrusion detection systems,
• servers for video recording and analytics,
• fiber optics,
• landscaping, and
• signage.

Funding and Costs: Funding: Wastewater Capital Improvement Program Project No. 10038373, Wastewater Facilities Security
Enhancements

Engineer’s Estimate: $40,000,000, with an estimated direct cost of construction of $30,000,000

Total Not-To-Exceed Initial Contract Award Amount:
$7,072,108
Anticipated Total Design-Build Budget:
$42,472,108

Agenda Title: DB-136, Wastewater Facilities Security Enhancements Commission Meeting Date: October 13, 2026

Page 3 ends

Schedule: Advertised: May 5, 2026
Estimated Pre-Construction Notice-to-Proceed Date:

November 2026
Estimated Construction Notice-to-Proceed Date if Commission Approves Project: May 2027
Estimated End Date: November 2028
Total Not -To-Exceed Contract Duration: 730 consecutive calendar days

Evaluation and
Selection Criteria:

On October 21, 2024, the SFPUC advertised a Request for Qualifications (RFQ) for Contract No. DB -136, Wastewater Facilities Security Enhancements. The RFQ process screened the field of proposers and identified those who established meeting the minimum qualifications. On January 8, 2025, the SFPUC received responses from two proposers. SFPUC evaluated and pre-qualified the following two firms:

• Anvil Builders Inc
• Cupertino Electric, Inc.

On May 5, 2026, the SFPUC advertised the Request for Proposals (RFP) for Contract No. DB -136, Wastewater Facilities Security Enhancements and invited the two pre -qualified firms to submit design-build proposals. The RFP contained primarily “performance based” requirements, providing the Design -Builder the opportunity to develop cost -effective solutions. The RFP also included a Supplemental Request for Qualifications (SRFQ). On the proposal deadline of July 21, 2026, the SFPUC received one proposal from Cupertino Electric, Inc.

One Responsive Bid Received; No Other Bids Received : The General Manager’s determination per section 6.23(c)(2) for Contract No. DB-136, Wastewater Facilities Security
Enhancements, is that further outreach efforts would not result in more than one proposal, and r emoval or modification of certain requirements in the contract would not result in more than one proposal. Therefore, staff recommends the Commission approve the General Manager’s determination to award Contract No. DB- 136, Wastewater Facilities Security Enhancements , to the sole, qualified, responsible, and responsive proposer, Cupertino Electric, Inc.

Environmental
Review:

On October 8, 2025, the Planning Department determined the Project to be categorically exempt from environmental review under the CEQA Guidelines Section 15061(b)(3) (Common Sense
Exemption) (Case No. 2025-002127ENV). View the exemption.

Agenda Title: DB-136, Wastewater Facilities Security Enhancements Commission Meeting Date: October 13, 2026

Page 4 ends

This action constitutes the Approval Action for the Project for the purposes of the CEQA pursuant to San Francisco Administrative Code Section 31.04(h).

Local Business
Enterprise Utilization
and Non-
Discrimination in
Contracting:

The Contract Monitoring Division established a Local Business Enterprise (LBE) subcontractor participation requirement of 8% for Pre-Construction (Design) services and 20% for Construction services for this contract. Cupertino Electric, Inc., committed to an LBE subcontractor participation of 15.50% for Pre -Construction (Design) services and submitted a Certificate of Commitment to a 20% LBE subcontractor participation for the Construction Phase.

Attachment(s): Contract Monitoring Division Memorandum
Agenda Title: DB-136, Wastewater Facilities Security Enhancements Commission Meeting Date: October 13, 2026

Page 5 ends

Location Map

This location map illustrates the project areas as identified by the red circles, at three main treatment facilities and other adjacent facilities.

PUBLIC UTILITIES COMMISSION
City and County of San Francisco
RESOLUTION NO. __________________

WHEREAS, The San Francisco Public Utilities Commission (SFPUC) Wastewater Enterprise is responsible for the design and construction of wastewater facilities security enhancements; and

WHEREAS, On May 5, 2026 , SFPUC advertised Contract No. DB-136, Wastewater Facilities Security Enhancements and invited the two pre-qualified proposers to submit proposals by July 21, 2026; and

WHEREAS, The Engineer’s Estimate is $40,000,000 for this design-build contract to address security enhancements at SFPUC wastewater facilities; and

WHEREAS, The contract duration is 730 consecutive calendar days; and

WHEREAS, On July 21, 2026, one pre-qualified proposer submitted a proposal for the project; and

WHEREAS, SFPUC staff and the Contract Monitoring Division (CMD) reviewed the proposal and have determined that Cupertino Electric, Inc. , is the sole responsible proposer with a responsive proposal; and

WHEREAS, Pursuant to San Francisco Administrative Code section 6.23(c)(2), SFPUC staff conducted an analysis and determined that further outreach efforts would not result in more than one proposal, that removal or modification of certain requirements in the contract would not result in more than one proposal, and the General Manager has executed a memorandum adopting this determination; and

WHEREAS, The Contract Monitoring Division established a Local Business Enterprise (LBE) subcontracting participation requirement of 8% and 20% for the respective design and construction phases for this contract, and Cupertino Electric, Inc., has committed to an LBE subcontractor participation of 15.50% for Pre -Construction (Design) services and submitted a Certificate of Commitment to a 20% LBE subcontractor participation for the Construction Phase; and

WHEREAS, On October 8, 2025, the Planning Department determined the Project to be categorically exempt from environmental review under the California Environmental Quality Act Guidelines Section 15061(b)(3) (Common Sense Exemption) (Case No. 2025- 002127ENV); and

WHEREAS, This action is to award Contract No. DB -136, Wastewater Facilities Security Enhancements, approve the project, and authorize proceeding with design and pre-construction services only; and

WHEREAS, Funds are available from Project No. 10038373, Wastewater Facilities Security Enhancements; now, therefore, be it,

RESOLVED, That this Commission hereby awards Contract No. DB -136, Wastewater Facilities Security Enhancements, in the initial Contract Award not-to-exceed amount of $7,072,108, and a contract duration of 730 consecutive calendar days, to the sole qualified, responsible, and responsive bidder, Cupertino Electric, Inc., and authorizes commencement of design and pre-construction services only under DB-136 in the amount not-to-exceed $7,072,108 and with a duration of 730 consecutive calendar days.

I hereby certify that the foregoing resolution was adopted by the San Francisco Public Utilities Commission at its meeting of October 13, 2026.

__________________________________
Director of Commission Affairs
San Francisco Public Utilities Commission
City & County of San Francisco
Daniel Lurie, Mayor
Office of the City Administrator
Carmen Chu, City Administrator

Contract Monitoring Division
Regina Chan, Director

1455 Market Street, Suite 16A, San Francisco, CA 94103
Telephone (415) 554 0630

MEMORANDUM

Date: August 26, 2026

To: Joey Yan, SFPUC
Holly Chan, SFPUC
Frank Gennaccaro, SFPUC

From: Adriana Duran, CMD

Subject: CMD Review of Bid Submitted on July 21, 2026, for DB-136 Wastewater Facilities
Security Enhancements

The Contract Monitoring Division (“CMD”) has reviewed the proposal and supporting documentation and applied the appropriate rating bonuses submitted for the above referenced design build project. Based on this review, CMD has determined that the proposals were materially compliant with Chapter 14B pre-award requirements.

The LBE rating bonus was not applicable because there were no LBE Proposers.

Proposer LBE Status
Cupertino Electric, Inc. Non-LBE

DESIGN PHASE: LBE Subcontracting Participation Requirement

The LBE subcontracting participation requirement for the Design Phase is 8%. The 8% LBE sub requirement for the Design Phase must be met at the time of proposal. The LBE sub requirements for Design Phase can only be met by CMD certified San Francisco Micro and/or Small-LBEs.

At the time of proposal, Cupertino Electric, Inc. met the 8% LBE subcontracting participation requirement by listing the following LBE subcontractors on its CMD Form 2A (CMD Contract Participation Form):

LBE Subcontractors Scope of Work Status Listed
Participation
Credited
Participation
EDESIGNC, Inc. SOW-Electrical
Design

SF-LBE WBE
(Micro) 7.90% 7.90%
Freyer & Laureta,
Inc. SOW-Civil Design SF-LBE MBE
(Small) 7.60% 7.60%
TOTAL 15.50% 15.50%

Cupertino Electric, Inc. also listed the following non-LBE subcontractors on its CMD Form 2A:

Non-LBE Firms Scope of Work

Listed Participation

Faith Group, LLC Low Voltage & Civil Design 34.60%
Stone Security SOW-Security Design 12.90%
TOTAL 47.50%

Cupertino Electric, Inc. satisfied the “Good Faith Efforts” requirement.

Cupertino Electric, Inc. utilized Approach A and exceeded the LBE subcontractor requirement by 35%.

CONSTRUCTION PHASE: LBE Subcontracting Participation Requirement

The LBE Subcontracting Requirement is 20% for the Construction Phase. The LBE subcontracting requirements for Construction Phase can only be met by CMD certified San Francisco Micro and/or Small- LBEs.

Due to the anticipated time lapse between proposal submission and the submission of the construction trade bid packages, Proposers were required to submit the LBE Commitment Certification form which is confirmation by the Proposer that it will meet the LBE subcontracting participation requirement established for the Construction Phase through the various trade packages. Cupertino Electric, Inc. has submitted this form.

CMD finds Cupertino Electric, Inc. is responsive to pre-award requirements of Chapter 14B. Once awarded, the contract will be monitored for compliance with the LBE subcontractor participation commitment, as well as other 14B requirements.

Primary CMD contact for the contract: Adriana Duran, [email protected]

CMD must be contacted immediately for:
- Subcontractor addition/substitution;
- Contract modification that cumulatively increases the original contract value by more than 20%;
- Prompt payment issues;
- Any other issues pertaining to LBE subcontractor participation

Noncompliance may result in penalties, including monetary fines. Please communicate with CMD early.

[cco/AD]