AGENDA ITEM
Public Utilities Commission
City and County of San Francisco

DEPARTMENT: Infrastructure Division

AGENDA NUMBER: 6b
MEETING DATE: October 27, 2026

Calendar: Consent Calendar
Project Manager: Ming Yee

Award Contract No. WW-797, Griffith Dry Weather Force Main Rehabilitation

Summary of
Proposed
Commission Action:

Award Contract No. WW-797, Griffith Dry Weather Force Main Rehabilitation, to the responsible bidder that submitted the lowest responsive bid , Corcus Construction, Inc. , in the amount of $727,503, and with a duration of 270 consecutive calendar days (approximately 9 months), to rehabilitate portions of the Griffith dry weather force main, install a new connection manhole, inspect the remaining concrete portion of the force main and replace if conditions are deemed poor, within the City and County of San Francisco.

The Planning Department has determined that the Project is exempt from the California Environmental Quality Act (CEQA), and the Commission will rely on that determination to make its decision on this action. This action constitutes the Approval Action for the Project for the purposes of the CEQA pursuant to San Francisco
Administrative Code Section 31.04(h).

Background: The San Francisco Public Utilities Commission (SFPUC) Wastewater Enterprise operates the Griffith Street Pump Station and its force main in the southeast area of San Francisco. Griffith Street Pump Station is an important component of the Yosemite/Fitch and Sunnydale facilities, which are an interconnected, integrated system of wastewater and stormwater pumping and transport/storage for the southern Bayside system.

The Griffith dry-weather force main was originally constructed in 1985. Certain portions of the force main were inspected while other portions have yet to be inspected. This project will include an inspection of the remaining portion of the force main, rehabilitation of the portions deemed to be in poor condition, and installation of a new connection manhole for future access.

This project will help maintain Wastewater Enterprise’s Operational Reliability Level of Service goal by replacing the section of the force main that was determined to need replacement, inspecting the remaining portion of the force main, and replacing those portions as necessary.

Agenda Title: WW-797, Griffith Dry Weather Force Main Rehabilitation Commission Meeting Date: October 27, 2026

Page 2 ends

Scope of Contract: The contract work will be performed at the Griffith Street Pump Station, located at the Griffith Street and Thomas Avenue intersection in San Francisco.

The contract work consists of:
• Replacing the steel section of force main;
• Constructing new thrust blocks;
• Constructing new tee and new manhole;
• Disconnecting and relocating existing air release valve; • Inspecting the concrete section of force main and replacing if needed; and
• Restoring pavement and landscape.

Funding and Costs: Funding Source: Sewer System Improvement Program funded Project No.10041814, Griffith Dry Weather Force Main Rehabilitation Engineer’s Estimate: $2,500,000
Award: $727,503

Schedule: Estimated Notice-to-Proceed Date: February 2027 Estimated Completion Date: November 2027
Duration: 270 consecutive calendar days (210 consecutive calendar days to Substantial Completion and an additional 60 consecutive calendar days to Final Completion)

Bid History:

Advertised: July 30, 2026

Bids Received: On September 10, 2026 , SFPUC received five sealed bids, as follows:

Bid Rank Bid Amount Bid
Preference
Compensable
Delay
Adjusted Bid Final Rank

1. Corcus Construction,
Inc.
$727,502.12 10.00% $13,500.00 $666,901.91 1

2. JDB & Sons
Construction, Inc.
$1,114,800.00 11.50% $15,000.00 $999,873.00 2

3. Precision
Engineering, Inc.
$1,482,225.00 13.00% $30.00 $1,289,561.85 3

4. Basset Engineering $1,499,979.00 11.50% $33,000.00 $1,356,686.42 4

5. Mitchell Engineering $1,524,510.00 12.00% $30,000.00 $1,367,968.80 5 Agenda Title: WW-797, Griffith Dry Weather Force Main Rehabilitation Commission Meeting Date: October 27, 2026

Page 3 ends

Because the SFPUC anticipates that potential unforeseen conditions or other factors outside of the contractor’s control may impact the schedule, staff included a requirement in the Invitation for Bids for bidders to provide a daily compensable time extension rate. At the bid opening, staff announced that SFPUC would use the value of 30 days to calculate the Compensable Delay bid adjustment amount.

Staff used the daily rate in each bid item to determine the total Compensable Delay value shown in the table above , which represents the sum of the Base Bid and Compensable Delay less any applicable Local Business Enterprise (LBE) bid discount. Staff used the Adjusted Bid value to compare and rank the bids to determine the lowest bidder. However, the contract award amount is the Base Bid value (not the Adjusted Bid value) . If the Commission awards the contract, the bidder’s daily compensable delay rate will become a term of the contract.

Application of bid preferences in accordance with Chapter 14B of the San Francisco Administrative Code did not change the final ranking of the low bidder.

Environmental
Review:

On March 3, 2026, the Planning Department determined the Project to be exempt from environmental review under the CEQA Guidelines Section 15601(b)(3) (Common Sense Exemption) (Case No. 2026- 000596ENV). View the exemption.

This action constitutes the Approval Action for the Project for the purposes of the CEQA pursuant to San Francisco Administrative Code Section 31.04(h).

Local Business
Enterprise Utilization
and Non-
Discrimination in
Contracting:

The Contract Monitoring Division established a 15% LBE
subcontracting requirement for this contract. Corcus Construction, Inc., committed to a 15.55% LBE subcontractor participation with its bid submittal.

Attachment(s): Contract Monitoring Division Memorandum

Agenda Title: WW-797, Griffith Dry Weather Force Main Rehabilitation Commission Meeting Date: October 27, 2026

Page 4 ends

Location Map

PUBLIC UTILITIES COMMISSION
City and County of San Francisco
RESOLUTION NO. __________________

WHEREAS, The San Francisco Public Utilities Commission (SFPUC) has identified improvements needed for the Griffith Dry Weather Force Main to maintain the Wastewater Enterprise’s Operational Reliability Level of Service goal; and

WHEREAS, On July 30, 2026, SFPUC advertised Contract No. WW-797, Griffith Dry Weather Force Main Rehabilitation; and

WHEREAS, The Engineer’s Estimate is $ 2,500,000 for this construction work to rehabilitate the Griffith dry weather force main by replacing the existing steel portion of the force main, and inspecting the concrete section of force main and replacing if needed; and

WHEREAS, The contract duration is 270 consecutive calendar days; and

WHEREAS, On September 10, 2026, SFPUC received and publicly opened five bids; and

WHEREAS, SFPUC staff and the Contract Monitoring Division (CMD) review ed the bids and the application of bid preferences and have determined that Corcus Construction, Inc., is the responsible bidder with the lowest responsive bid; and

WHEREAS, The CMD established a 15% Local Business Enterprise (LBE) subcontracting requirement for this contract, and Corcus Construction, Inc., committed to

15.55% LBE subcontractor participation in its bid submittal; and

WHEREAS, On March 3, 2026, the Planning Department determined the Project to be exempt from environmental review under the C alifornia Environmental Quality Act Guidelines Section 15601(b)(3) (Common Sense Exemption ) (Case No. 202 6- 000596ENV); and

WHEREAS, Funds are available from Project No. 10041814, Griffith Dry Weather Force Main Rehabilitation; now, therefore, be it,

RESOLVED, That this Commission hereby awards Contract No. WW-797, Griffith Dry Weather Force Main Rehabilitation , in the amount of $727,503, and with a duration of 270 consecutive calendar days, to the responsible bidder that submitted the lowest responsive bid, Corcus Construction, Inc.

I hereby certify that the foregoing resolution was adopted by the San Francisco Public Utilities Commission at its meeting of October 27, 2026.

__________________________________
Director of Commission Affairs
San Francisco Public Utilities Commission
City & County of San Francisco
Daniel Lurie, Mayor

Office of the City Administrator
Carmen Chu, City Administrator

Contract Monitoring Division
Regina Chan, Director

MEMORANDUM

Date: September 22, 2026

To: Ming Yee, SFPUC
Venessa Arif, SFPUC

From: Helen Smolinski, Contract Monitoring Division

Subject: CMD Review of Bids Submitted on September 10, 2026 for WW-797 Griffith Dry Weather Force Main Rehabilitation

Bids and Bid Discounts
Corcus Construction, Inc. (“Corcus”) is the apparent low bidder after the bid discount.

The bid discount was applied to bidders who are certified by the Contract Monitoring Division (“CMD”) as an LBE in the type of work that is specified for the bidder by the Contract Awarding Authority. The Pilot Neighborhood LBE Program discounts were also applied to bidders below, as applicable. [Sec. 14B.22(d)]

Bidder Base Bid Compensable
Delay
Total Bid with
Compensable
Delay
CMD
Discount
Adjusted Total
Bid with CMD
Discount
Corcus Construction, Inc. $727,502.12 $13,500.00 $741,002.12 10.00% $666,901.91 JDB & Sons Construction Inc $1,114,800.00 $15,000.00 $1,129,800.00 11.50% $999,873.00 Precision Engineering Inc $1,482,225.00 $30.00 $1,482,255.00 13.00% $1,289,561.85 Basset Engineering $1,499,979.00 $33,000.00 $1,532,979.00 11.50% $1,356,686.42 Mitchell Engineering $1,524,510.00 $30,000.00 $1,554,510.00 12.00% $1,367,968.80

LBE Subcontracting Participation Requirement
Corcus satisfactorily demonstrated how they will meet the LBE subcontractor participation requirement.

A combination of Micro LBE and Small LBE participation will count toward LBE subcontractor participation compliance. Corcus’s commitment for this contract:

Requirement % Commitment %
Micro/Small LBE 15% 15.55%

In their bid, Corcus listed the following subcontractors on this contract:

Supplier Name Scope of Work

LBE

LBE
Size

LBE
Percent

Percent
of
Work
Amount
Crana Trucking Inc
Trucking – import of
material and export
of dirt

SF LBE-
OBE SML 100% 3.44% $25,000.00
Alta Group, Inc. Rebar SF LBE-
WBE SML 100% 0.69% $5,000.00
Apex Testing
Laboratories Inc Material testing SF LBE-
MBE SML 100% 1.57% $11,428.00
DR Traffic Control Traffic control SF LBE-
MBE MICR 100% 0.51% $3,720.00
GSW Construction
Inc.

Structural concrete
(partial), Paving
(partial), Concrete
flatwork (partial)

SF LBE-
OBE MICR 100% 9.35% $68,000.00
Pipe and Plant
Solutions CCTV & Flushing N/A N/A N/A 0.76% $5,500.00

“Good Faith Efforts” Requirement
Corcus satisfied the “Good Faith Efforts” requirement.

Corcus utilized Approach A by relying on self-performed contract work to meet the 35% good faith efforts requirement.

CMD Determination
CMD finds Corcus is responsive to pre-award requirements of Chapter 14B. Once awarded, the contract will be monitored for compliance with the LBE subcontractor participation commitment, as well as other 14B requirements.

Primary CMD contact for the contract: Helen Smolinski, [email protected]

CMD must be contacted immediately for:
- Subcontractor addition/substitution;
- Contract modification that cumulatively increases the original contract value by 20%; - Prompt payment issues;
- Any other issues pertaining to LBE subcontractor participation

Noncompliance may result in penalties, including monetary fines. Please communicate with CMD early.