Redwood Coast Energy Authority
633 3rd Street, Eureka, CA 95501
Phone: (707) 269-1700 Toll-Free (800) 931-7232 Fax: (707) 269-1777 E-mail: [email protected] Web: www.redwoodenergy.org

BOARD OF DIRECTORS REGULAR MEETING

REVISED AGENDA
Wharfinger Building, Bay Room (downstairs) September 26, 2024 1 Marina Way, Eureka, CA 95501 Thursday, 3:30 p.m.

Any member of the public needing special accommodation to participate in this meeting or access the meeting materials should email [email protected] or call (707) 269- 1700 at least 3 business days before the meeting. Assistive listening devices are available.

Pursuant to Government Code section 54957.5, all writings or documents relating to any item on this agenda which have been provided to a majority of the Board, including those received less than 72 hours prior to the Committee’s meeting, will be made available to the public at www.RedwoodEnergy.org.

NOTE: Speakers wishing to distribute materials to the Board at the meeting, please provide 13 copies to the Board Clerk.

THIS IS A HYBRID IN-PERSON AND VIRTUAL MEETING.

The RCEA Board of Directors holds in-person hybrid meetings. When attending, please socially distance as much as possible and be courteous to those who choose to wear a mask.

To participate in the meeting online, go to https://us02web.zoom.us/j/81972368051. To participate by phone, call (669) 900-6833 or (253) 215-8782. Enter webinar ID: 819 7236 8051.

To make a comment during the public comment periods, raise your hand in the online Zoom webinar, or press star (*) 9 on your phone to raise your hand. You will continue to hear the meeting while you wait. When it is your turn to speak, a staff member will prompt you to unmute your phone or computer. You will have 3 minutes to speak.

You may submit written public comment by email to [email protected].

Please identify the agenda item number in the subject line. Comments will be included in the meeting record but not read aloud during the meeting.

While downloading the Zoom application may provide a better meeting experience, Zoom does not need to be installed on your computer to participate. After clicking the webinar link above, click “start from your browser.”
1 RCEA September 26, 2024, Board of Directors Meeting Revised Agenda

Page 2 ends

OPEN SESSION Call to Order

1. ROLL CALL - REMOTE DIRECTOR PARTICIPATION

1.1. Approve teleconference participation request for this meeting by Director pursuant to Brown Act revisions of AB 2449 due to an emergency circumstance to be briefly described.

2. REPORTS FROM MEMBER ENTITIES

3. ORAL AND WRITTEN COMMUNICATIONS
This time is provided for people to address the Board or submit written communications on matters not on the agenda.

At the conclusion of all oral communications, the Board may respond to statements. Any request that requires Board action will be set by the Board for a future agenda or referred to staff.

4. CONSENT CALENDAR
All matters on the Consent Calendar are considered to be routine by the Board and are enacted in one motion. There is no separate discussion of any of these items. If discussion is required, that item is removed from the Consent Calendar and considered separately. At the end of the reading of the Consent Calendar, Board members or members of the public can request that an item be removed for separate discussion.

4.1 Approve Minutes of August 22, 2024, Board Meeting.

4.2 Approve Disbursements Report.

4.3 Accept Financial Reports.

4.4 Approve Resolution 2024-10, Approving and Attesting to the Veracity of the 2023 Power Source Disclosure Report.

4.5 Adopt Resolution 2024-11 adopting a Procurement Policy, Investment Policy and amending the Financial Management Policy.

4.6 Approve Resolution 2024-12 Approving the Form of and Authorizing the Execution of the First Amendment to the Resource Adequacy Agreement with the Regents of the University of California.

4.7 Approve Resolution 2024-13 Approving the Form of and Authorizing the Execution of the Second Amendment to the North Coast Highway Solar 1 Power Purchase Agreement and the Second Amendment to the North Coast Highway Solar 2 Power Purchase Agreement Reducing Delay Damages Rates for the Feed-In Tariff Projects.

4.8 For the North Coast Plug-In Electric Vehicle Charging Network Phase 2 Construction Contract Award:

1. Determine that the Hooven & Reese and A.T.C. bids are responsive to IFB-24-505.

2. Reject the bid protest submitted by ACGC, inc. on September 20, 2024.

3. Award a contract for the installation of electric vehicle charging stations for the RCEA North Coast Plug-In Electric Vehicle Charging Network Expansion Project to Hooven & Reese Inc. in the amount of $142,414.30 for the McKinleyville and Arcata sites; and authorize the Executive Director to execute all applicable documents subject to RCEA General Counsel review. 2 RCEA September 26, 2024, Board of Directors Meeting Revised Agenda

Page 3 ends

5. REMOVED FROM CONSENT CALENDAR ITEMS
Items removed from the Consent Calendar will be heard under this section.

COMMUNITY CHOICE ENERGY (CCE) BUSINESS (Confirm CCE Quorum) Items under this section of the agenda relate to CCE-specific business matters that fall under RCEA’s CCE voting provisions, with only CCE-participating jurisdictions voting on these matters with weighted voting as established in the RCEA joint powers agreement.

6. OLD CCE BUSINESS – None.

7. NEW CCE BUSINESS

7.1. Interconnection Process Enhancements Request for Information Authorize issuance of the Request for Information for CAISO Queue Cluster 15 Resources in accordance with the terms and conditions of the attached RFI Protocol and Commercial Interest Exclusivity Agreement.

7.2. Statewide Allocation of Carbon-Free Attributes from Diablo Canyon Nuclear Power Plant
Direct staff on whether to accept the nuclear allocation, making a short-term exception to the RCEA Energy Risk Management Policy’s prohibition on nuclear power procurement, as allowed for in the Energy Risk Management Policy.

Provide guidance on strategic use of the nuclear allocation as a tool for cost savings or greenhouse reductions, should the Board elect to accept the allocation.

Direct staff to report back to the Board with options for Policy Platform updates related to nuclear energy.

END OF COMMUNITY CHOICE ENERGY (CCE) BUSINESS

8. OLD BUSINESS – None.

9. NEW BUSINESS

9.1 Rural Regional Energy Network North Administrative Actions – Administrative Consultant Contract and Termination of Previous RuralREN Memoranda of Understanding

1. Award a contract with Frontier Energy for RuralREN North Administrative Services for a term of 2024-2027 and a not-to-exceed amount of $1,200,265 and Authorize the Interim Executive Director to execute all applicable documents subject to RCEA General Counsel review. 3 RCEA September 26, 2024, Board of Directors Meeting Revised Agenda

Page 4 ends

2. Authorize the Interim Executive Director to execute all documents to terminate the original RuralREN agreements subject to RCEA General Counsel review.

9.2 Addition and Reclassification of Staff Positions
Approve:

1. Addition of an TERAS Project Analyst position,

2. Unfreezing a DSM Manager Position and Reclassify as DSM Technician contingent on final approval of RuralREN North by the CPUC,

3. Unfreezing a DSM Specialist Position and Reclassify as DSM Coordinator contingent on final approval of RuralREN North by the CPUC,

4. Reclassifying Power Resource Specialist to Power Resource Analyst,

5. RCEA Organization Chart with approved changes.

10. STAFF REPORTS

10.1 Interim Executive Director’s Report

11. FUTURE AGENDA ITEMS
Any request that requires Board action will be set by the Board for a future agenda or referred to staff.

12. CLOSED SESSION

12.1. Public Employment, pursuant to Government Code Section 54957: Executive Director recruitment.

13. RECONVENE TO OPEN SESSION

14. CLOSED SESSION REPORT

15. ADJOURNMENT

NEXT REGULAR MEETING
Thursday, October 24, 2024, 3:30 p.m.

Wharfinger Building downstairs Bay Room, 1 Marina Way, Eureka, CA 95501 Online and phone participation will also be possible via Zoom. 4

Page 1 of 2 ends

STAFF REPORT
Agenda Item # 1.1
AGENDA DATE: September 26, 2024
TO: RCEA Board of Directors
FROM: Eileen Verbeck, Interim Executive Director
SUBJECT: Member Teleconference Participation

BACKGROUND
Since emergency Brown Act meeting law changes went into effect in 2020 due to the COVID-19 public health emergency, the RCEA Board of Directors, Community Advisory Committee (CAC) and the subcommittees of those bodies met online with no physical, public meeting location.

Governor Newsom signed AB 361 into law in September 2021, which allowed these bodies to continue meeting completely virtually without publishing each member’s participation location while the COVID state of emergency continued and state or local officials recommended social distancing measures or the RCEA Board determined that meeting in person posed health and safety risks.

The COVID-19 State of Emergency ended on February 28, 2023, and RCEA Board and CAC meetings returned to meeting in-person at a physical location, with allowances under existing Brown Act rules or new AB 2449 Brown Act rules should a Board or CAC member need to participate from a remote location for certain reasons. If another state of emergency is declared, these bodies may be able to return to completely remote meetings.

SUMMARY
RCEA Board Directors may attend up to two meetings per year from a remote location without making the location accessible to the public for the following reasons:

1. “Just cause”
a. To provide childcare or caregiving need to a child, parent, grandparent, grandchild, sibling, spouse, or domestic partner;
b. Due to a contagious illness that prevents the member from attending in-person; c. Due to a need related to a physical or mental disability as defined in Government Code sections 12926 and 12926.1 not otherwise accommodated; and d. Due to travel while on official business of the legislative body or another state or local agency.

2. “Emergency circumstance” due to a physical or family medical emergency that prevents the member from attending in person.

If a Board Director would like to attend the meeting remotely due to an emergency circumstance, the Board will take action by majority vote to approve the Director’s remote participation. A vote is not necessary for a request to attend remotely for just cause. A brief 5

Page 2 of 2 ends

description, protecting the Director’s (or Director’s family member’s) medical privacy, needs to be provided in both cases.

The remotely participating Board Director needs to publicly disclose at the meeting before any action (vote) is taken, whether anyone 18 years of age or older is present in the room at the remote location with the Director, and the general nature of the individual’s relationship with the Director.

If the Board Director anticipates needing to participate remotely for more than 2 meetings per year, staff recommends arranging for a publicly and ADA accessible space with visual and audio meeting capabilities from which to participate.

Staff asks to be notified one-week in advance, if possible, of remote meeting attendance so the Director’s publicly and ADA accessible remote meeting address can be published in the agenda, if required per Brown Act open meeting laws.

Current Remote Participation Requests
As of the writing of this staff report, there have been no remote director participation for “just cause” or “emergency circumstances” requests.

RECOMMENDED ACTION (if needed)
Approve teleconference participation request for this meeting by Director pursuant to Brown Act revisions of AB 2449 due to an emergency circumstance to be briefly described. 6 Redwood Coast Energy Authority
633 3rd Street, Eureka, CA 95501
Phone: (707) 269-1700 Toll-Free (800) 931-7232 Fax: (707) 269-1777 E-mail: [email protected] Web: www.redwoodenergy.org

BOARD OF DIRECTORS DRAFT MEETING MINUTES
Wharfinger Building, Bay Room August 22, 2024
1 Marina Way, Eureka, CA 95501 Thursday, 3:30 p.m.

Vice Chair Scott Bauer called a regular meeting of the Board of Directors of the Redwood Coast Energy Authority to order on the above date at 3:33 p.m. Notice of this meeting was posted on August 16, 2024.

PRESENT: Natalie Arroyo, Vice Chair Scott Bauer, Skip Jorgensen, Elise Scafani, Jack Tuttle, Frank Wilson, Sheri Woo. ABSENT: Kris Mobley, Frankie Myers, Jason Ramos, Chair Sarah Schaefer.

STAFF AND OTHERS PRESENT: Regulatory and Legislative Policy Manager Faith Carlson, Finance Specialist Ronnie Chaussé, Power Resources Director Richard Engel, Senior Power Resources Manager Jocelyn Gwynn, The Energy Authority (TEA) California Account Director Jaclyn Harr, Human Resources Manager Kristy Siino, Board Clerk Lori Taketa, Interim Executive Director Eileen Verbeck. Closed session: Tripepi Smith Director Christine Martin.

REPORTS FROM MEMBER ENTITIES
Director Tuttle reported that Swell Energy is no longer operating in Humboldt County.

ORAL AND WRITTEN COMMUNICATIONS
California Forest Pest Council Chair Danielle Lindler submitted a comment supporting RCEA’s biomass power procurement.

Member of the public Sharon Kramer submitted a comment supporting microgrids designed for sheep co-grazing.

Member of the public Ken Miller submitted an article opposing the state’s net-energy metering program changes and supporting residential solar and distributed energy generation.

CONSENT CALENDAR

4.1 Approve Minutes of June 27, 2024, Board Meeting.

4.2 Approve Disbursements Reports.

4.3 Accept Financial Reports.

4.4 Accept Quarterly Budget Report for Fiscal Year 2023-2024 Q4.

4.5 Authorize the Executive Director to Execute Amendment No. 4 to the Agreement for Professional Services with Aiqueous for Demand-Side Management Database Operation Services to Extend Services through June 2025 for a Total Amended Budget of $373,950.
7 RCEA August 22, 2024, Board of Directors DRAFT Meeting Minutes

Page 2 ends

4.6 Adopt Resolution 2024-09 of the Redwood Coast Energy Authority Authorizing Access to Summary Criminal History Information for Employment, Licensing or Certification Purposes.

4.7 Approve Revised Community Advisory Committee Charter.

4.8 Appoint Benjamin Fordham to the Community Advisory Committee County 3 Seat for a Term Ending on March 31, 2026.

Director Woo requested item 4.8 be pulled from the Consent Calendar.

M/S: Arroyo, Woo: Approve the Consent Calendar with the exception of item 4.8.

The motion passed with a unanimous vote. Ayes: Arroyo, Bauer, Jorgensen, Scafani, Tuttle, Wilson, Woo. Noes: None. Absent: Mobley, Myers, Ramos, Schaefer, Abstain:

None.

ITEMS REMOVED FROM CONSENT CALENDAR

4.8 Community Advisory Committee County 3 Seat Appointment CAC candidate Benjamin Fordham introduced himself and described his energy-related experience. There was no public comment on this item.

M/S: Woo, Arroyo: Appoint Benjamin Fordham to the Community Advisory Committee County 3 Seat for a Term Ending on March 31, 2026.

The motion passed with a unanimous vote. Ayes: Arroyo, Bauer, Jorgensen, Scafani, Tuttle, Wilson, Woo. Noes: None. Absent: Mobley, Myers, Ramos, Schaefer, Abstain:

None.

OLD CCE BUSINESS

6.1. Energy Risk Management Quarterly Report
TEA’s California Account Director Harr reported that California’s renewable energy and energy storage resource development efforts successfully addressed this summer’s electricity needs so far. As the CPUC determines how the new Slice of Day Resource Adequacy procurement requirement is to be implemented, it appears RCEA may pay for the higher reliability requirements incrementally. The previous cash reserve forecast’s extreme drop has been more evenly redistributed, but still results in a decreased reserve building rate.

The Diablo Canyon nuclear power plant’s retirement has been postponed to 2030 and all California load serving entities (LSEs) are being offered portions of the plant’s carbon free renewable energy credit allocation. LSEs’ customers must help pay for the plant’s operating cost via the Power Charge Indifference Adjustment on their electric bills regardless of whether the LSE accepts these credits. The plant will not increase its energy production.

The directors discussed RCEA’s current prohibition of long-term nuclear procurement, the problem of safe nuclear waste storage, and how the renewable certificates will affect the program’s procurement portfolio, the agency’s bottom line and future nuclear plant development. The directors will discuss accepting the nuclear allocation at their next meeting.

There was no public comment on this item.
8 RCEA August 22, 2024, Board of Directors DRAFT Meeting Minutes

Page 3 ends

M/S: Arroyo, Scafani: Accept Energy Risk Management Quarterly Report and 2024 California Summer Market Conditions Assessment.

The motion passed with a unanimous vote. Ayes: Arroyo, Bauer, Jorgensen, Scafani, Tuttle, Wilson. Noes: None. Absent: Mobley, Myers, Ramos, Schaefer, Abstain: None.

Non-Voting: Woo.

6.2. Feed-In Tariff Redesign
Senior Power Resources Manager Gwynn described RCEA’s feed-in tariff program which offers above-market pricing and a streamlined application and agreement process for developers of local renewable energy projects of up to 1 MW. Of six projects enrolled in the program after the 2019 program launch, only the two North Coast Highway Solar projects remain under contract due to pandemic-driven changes. Staff hope to revive the stalled Hatchery Road projects with the same developers and recognize the need to update FIT program terms to attract new projects. Staff proposed increasing project capacity to up to 5 MW, requiring battery storage pairing and ability to provide resource adequacy for projects larger than 1 MW, and increasing pricing including higher payment for energy delivered during the grid’s peak demand hours.

The directors discussed how waste digester projects may participate in the FIT program.

There was no public comment on this item.

M/S: Jorgensen, Arroyo:

1. Authorize issuance of the redesigned Feed-In Tariff Program with terms and conditions consistent with the revised Tariff Schedule and Power Purchase Agreement.

2. Authorize the Executive Director to approve administrative revisions to the Feed-In Tariff Schedule and Power Purchase Agreement, in consultation with legal counsel in the instance of the power Purchase Agreement, on condition that the revisions do not fundamentally change the terms and conditions of the program or measurably increase risk exposure for RCEA.

The motion passed with a unanimous vote. Ayes: Arroyo, Bauer, Jorgensen, Scafani, Tuttle, Wilson. Noes: None. Absent: Mobley, Myers, Ramos, Schaefer, Abstain: None.

Non-Voting: Woo.

OLD BUSINESS

8.1 Tumbleweed Long Duration Energy Storage Amendment
Power Resources Director Engel described the proposed amendment to the long-duration storage agreement between Rev Renewables and California Community Power, a joint powers authority to which RCEA belongs. The developer requested a price increase due to higher equipment costs and potential tariff changes for batteries manufactured in China.

Under the most negative conditions, RCEA would pay an additional $2.5 million over the contract’s 15-year term. A more likely scenario is that RCEA will pay $1.5 million more over that period. If RCEA chose to leave the contract, the agency would need to find a 9 RCEA August 22, 2024, Board of Directors DRAFT Meeting Minutes

Page 4 ends

replacement buyer or face paying the contracted price without receiving any long-duration storage development credit.

The directors discussed whether the agency would realize any financial gain from this amendment, and the reason RCEA entered this agreement, which was to comply with the CPUC Mid-Term Reliability procurement mandate. There was no public comment.

M/S: Arroyo, Jorgensen: Authorize RCEA’s continued participation in the Tumbleweed Energy Storage Services Agreement under the terms of the Second Amendment.

The motion passed with a unanimous vote. Ayes: Arroyo, Bauer, Jorgensen, Scafani, Tuttle, Wilson, Woo. Noes: None. Absent: Mobley, Myers, Ramos, Schaefer, Abstain:

None.

STAFF REPORTS

10.1 Interim Executive Director’s Report (Information only) Interim Executive Director Verbeck reported that the Fairhaven battery storage resource adequacy contract was terminated after CAISO informed the project developer that its grid interconnection would be delayed several years due to prolonged inactivity of the biomass plant that previously made use of the site’s grid connection. RCEA and Swell terminated the behind-the-meter battery storage partnership and Swell no longer supports Humboldt County Self-Generation Incentive Program (SGIP) participants. Another company may step in to offer SGIP services. The Humboldt County Regional Climate Action Plan is ready for public comment. A public meeting will be held on September 10. The Department of Energy will negotiate the Tribal Energy Resilience and Sovereignty grant award agreement prior to a potential administration change. Ms. Verbeck shared photos of workers installing photovoltaic panels at the Sandrini solar project site. A CPUC Administrative Law Judge issued a proposed decision to split the Rural Regional Energy Network into distinct North and Central Regional Energy Networks (RENs), with RCEA to lead the Rural REN North. The proposed Rural REN North funding was $33.1 million over three years, slightly more than requested in the group’s petition. After the comment period ends on September 10, and a reply period, the CPUC could vote on the project as early as September 26. There was no public comment on this item.

CLOSED SESSION

12.1 Public Employment, pursuant to Government Code Section 54957: Executive Director recruitment.

There was no public comment on the closed session agenda item. The Directors convened in closed session at 5:03 p.m. and reconvened in open session at 6:09 p.m. Vice Chair Bauer stated there was no closed session report and adjourned the meeting at 6:10 p.m.

Lori Taketa
Board Clerk
10 Accrual Basis Redwood Coast Energy Authority
Disbursements Report
As of July 31, 2024
Type Date Num Name Memo Amount
Check 07/03/2024 18423 CCE Customer CCE Equipment Rebate - Res 240604-2109 -400.00 Check 07/03/2024 18424 CCE Customer CCE Heat Pump Rebate - Res 240327-2003 -1,875.00 Check 07/03/2024 18425 CCE Customer CCE Heat Pump Rebate - Res 240603-2108 -700.00 Check 07/03/2024 18426 CCE Customer CCE Heat Pump Rebate - Res 240425-2041 -600.00 Check 07/03/2024 18427 CCE Customer CCE Heat Pump Rebate - Res 240425-2040 -600.00 Check 07/03/2024 18428 CCE Customer Res EV rebate #EV14 -2,000.00 Bill Pmt -Check 07/03/2024 18429 Donald Dame CCE Consulting services- June 2024 -262.50 Bill Pmt -Check 07/03/2024 18430 Engel, R. June 2023 Mileage Reimb -115.24 Bill Pmt -Check 07/03/2024 18431 Frontier Energy, Inc. PA Program Consulting - May 2024 -516.00 Bill Pmt -Check 07/03/2024 18432 Hilson, D. Mileage reimbursement - June 2024 -172.26 Bill Pmt -Check 07/03/2024 18433 Kullmann, S. CCEC Forum, Lodging & Taxi -678.85 Bill Pmt -Check 07/03/2024 18434 Quest VEEAM O365 Backup 1 yr for 47 users -991.00 Bill Pmt -Check 07/03/2024 18435 Revolution Bicycles June 2024: 1 E-Bike Voucher -500.00 Bill Pmt -Check 07/03/2024 18436 Rodriguez, Louis Mileage reimbursement - June 2024 -34.84 Bill Pmt -Check 07/03/2024 18437 Taketa, L. Mileage Reimb & Employee Reimb - June -39.26 Bill Pmt -Check 07/03/2024 18438 Times Printing Company Envelopes for Late Notice letters -389.59 Liability Check 07/05/2024 ACH Ascensus Paydate 07/05/2024 -12,209.97 Liability Check 07/05/2024 ACH Ascensus Paydate 07/05/2024 -11,570.63 Liability Check 07/05/2024 ACH EDD Paydate 07/05/2024 -7,665.59 Liability Check 07/05/2024 ACH Internal Revenue Service Paydate 07/05/2024 -34,223.59 Bill Pmt -Check 07/05/2024 ACH CalCCA Operational Member dues Q1 FY 24/25 -28,094.00 Bill Pmt -Check 07/05/2024 ACH Leapfrog Power, Inc June 2024 RA Invoice -36,740.00 Bill Pmt -Check 07/05/2024 ACH Viridity Energy Solutions, Inc. Tierra Buena RA-June 2024 -16,900.00 Paycheck 07/05/2024 ACH Employees Paydate 07/05/2024 -83,448.55 Bill Pmt -Check 07/15/2024 ACH The Energy Authority TEA Invoice #TEA 62024 June 2024 -3,662,831.58 Bill Pmt -Check 07/18/2024 ACH The Energy Authority Special Invoice- Capacity Sales Sept 2024 -1,000,000.00 Liability Check 07/19/2024 ACH Ascensus Paydate 07/19/24 -12,857.55 Liability Check 07/19/2024 ACH Ascensus Paydate 07/19/24 -11,632.51 Liability Check 07/19/2024 ACH CICCS Coalition for Controlling Insurance July 2024 EAP Coverage -64.94 Liability Check 07/19/2024 ACH Keenan Aug 2024 Medical Coverage -26,729.55 Liability Check 07/19/2024 ACH EDD Paydate 07/19/24 -8,145.47 Liability Check 07/19/2024 ACH Internal Revenue Service Paydate 07/19/24 -35,791.77 Bill Pmt -Check 07/19/2024 ACH Amerex Brokers LLC May 2024 Brokerage Fee for LT RPS PCC3 -80,000.00 Bill Pmt -Check 07/19/2024 ACH CalPine Corporation Calpine June 2024 Costs -63,795.21 Bill Pmt -Check 07/19/2024 ACH Humboldt Sawmill Co. June 2024 Electricity Generation -676,564.92 Bill Pmt -Check 07/19/2024 ACH Snow Mountain Hydro, LLC June 2024 Electricity Generation -20,191.74 Bill Pmt -Check 07/19/2024 ACH PG&E EV Account H St EV station 06/05-07/04/2024 -322.12 Bill Pmt -Check 07/19/2024 ACH PG&E Office Utility 06/06-07/07/2024 utilities for 917 3rd Street -415.46 Bill Pmt -Check 07/19/2024 ACH Recology Act 061371327, 917 3rd St. June 2024 -71.48 Bill Pmt -Check 07/19/2024 ACH Recology Act 060703330, 633 3rd St. June 2024 -105.52 Liability Check 07/19/2024 18439 Ameritas - Dental VOID: Aug 2024 Coverage 0.00 Liability Check 07/19/2024 18440 Ameritas - Vision VOID: Aug 2024 Coverage 0.00 Liability Check 07/19/2024 18441 Ameritas - Dental Aug 2024 Coverage -2,391.76 Liability Check 07/19/2024 18442 Ameritas - Vision Aug 2024 Coverage -444.68 Check 07/19/2024 18443-54 NEM Customers NEM Account Closeout -1,073.23 Check 07/19/2024 18455 CCE Customer CCE Equipment Rebate - Res #240625-2132 -400.00 Check 07/19/2024 18456 CCE Customer CCE Heat Pump Rebate - Res #240319-1981 -1,212.50 Check 07/19/2024 18457 CCE Customer VOID: Ck 18457, $297.84 reissued on 08/02/24 0.00

Page 1 of 2 ends

11 Accrual Basis Redwood Coast Energy Authority
Disbursements Report
As of July 31, 2024
Type Date Num Name Memo Amount
Check 07/19/2024 18458 CCE Customer Res EV rebate #EV16 -2,000.00 Bill Pmt -Check 07/19/2024 18459 Aiqueous, LLC May 2024 & June 2024 database services -17,352.48 Bill Pmt -Check 07/19/2024 18460 Amazon.com Office and IT supplies - June 2024 -1,442.07 Bill Pmt -Check 07/19/2024 18461 AT&T RCAM Router fee: 05/19-06/18/24 -163.00 Bill Pmt -Check 07/19/2024 18462 AT&T RCAM charges: 06/29-07/28/24 -879.96 Bill Pmt -Check 07/19/2024 18463 AT&T Long Distance Phone charges: 06/25 - 07/24/2024 -115.66 Bill Pmt -Check 07/19/2024 18464 Baker Tilly US, LLP Professional services - period ending 6/28/24 -11,655.00 Bill Pmt -Check 07/19/2024 18465 Bithell, M. June 2024 Mileage & Purchase Reimbursement -51.42 Bill Pmt -Check 07/19/2024 18466 Carter Properties, LLC 917 3rd Street Office Lease - Aug 2024 -2,375.00 Bill Pmt -Check 07/19/2024 18467 City of Arcata June 2024 Excessive Energy Use Tax -503.29 Bill Pmt -Check 07/19/2024 18468 City of Arcata June 2024 Utility User Tax -11,628.24 Bill Pmt -Check 07/19/2024 18469 City of Eureka-Water 917 3rd St & 633 3rd St June bills -327.03 Bill Pmt -Check 07/19/2024 18470 Diamond, Nancy June 2024 Legal Services -24,641.20 Bill Pmt -Check 07/19/2024 18471 Enterprise Car rental June 2024 -106.23 Bill Pmt -Check 07/19/2024 18472 Hertz Car rental June 2024 - CalCCA LegCom -448.85 Bill Pmt -Check 07/19/2024 18473 HireRight Background screening -102.75 Bill Pmt -Check 07/19/2024 18474 Humboldt Bay Coffee Co. Office Coffee - 633 3rd St -51.90 Bill Pmt -Check 07/19/2024 18475 Humboldt County DHHS 24/25 Annual HazMat Fees - RCAM -511.70 Bill Pmt -Check 07/19/2024 18476 Humboldt HyCycle June 2024: 1 E-Bike Voucher -500.00 Bill Pmt -Check 07/19/2024 18477 Local Worm Guy June 2024 Compost service 633 & 917 3rd St -96.00 Bill Pmt -Check 07/19/2024 18478 Mission Uniform & Linen July 2024 Mat cleaning and supplies -302.13 Bill Pmt -Check 07/19/2024 18479 North Coast Cleaning June 2024 Cleaning Services -1,090.00 Bill Pmt -Check 07/19/2024 18480 Optimum Business-633 633 3rd St: Phone & Internet - 6/28-7/27/2024 -1,102.64 Bill Pmt -Check 07/19/2024 18481 Pacific Paper Company Office Supplies: Paper, Post-its, Batteries -95.10 Bill Pmt -Check 07/19/2024 18482 Revolution Bicycles June 2024: 2 E-Bike Vouchers -1,700.00 Bill Pmt -Check 07/19/2024 18483 Terry, P. CCEC Forum : Lodging & Parking 6/24-6/27/24 -618.66 Bill Pmt -Check 07/19/2024 18484 Times Printing Company June 2024 mailers -1,434.95 Bill Pmt -Check 07/19/2024 18485 Ubeo Business Services 633 3rd St Printer Charges: 06/06-07/05/24 -213.88 Bill Pmt -Check 07/19/2024 18486 Winzler, John Office Lease - 633 3rd St., Aug 2024 -7,946.31 Bill Pmt -Check 07/19/2024 18487 Yakovleva, Vera A. CALCCA LegCom.: Gas 6/27-6/29/24 -97.08 Paycheck 07/19/2024 ACH Employees Paydate 07/19/24 -85,415.73 Check 07/22/2024 Debit Umpqua Service Charge -234.66
Liability Check 07/25/2024 ACH Principal Life Insurance Company August 2024 Coverage -104.22 Liability Check 07/25/2024 ACH Colonial Life July 2024 Coverage -2,353.55 Bill Pmt -Check 07/25/2024 ACH PG&E - ACV RCAM site utilities 05/29-06/26/2024 -322.23 Bill Pmt -Check 07/29/2024 ACH CA Dept. of Tax & Fee Administration Electrical Energy Surcharge Return Q2 2024 -39,920.00 Bill Pmt -Check 07/29/2024 ACH The Energy Authority CAISO Invoice #CISO072424-JULY -17,634.49 TOTAL -6,081,306.27

Page 2 of 2 ends

12 Redwood Coast Energy Authority
Profit & Loss Budget vs. Actual
July 2024
Jul 24 Budget % of Budget
Ordinary Income/Expense
Income
5 REVENUE EARNED
Total 5000 · Revenue - government agencies 246,764.61 1,375,000.00 17.95% Total 5100 · Revenue - program related 491,597.30 50,000.00 983.2% Total 5400 · Revenue-nongovernment agencies 51,707.50 413,000.00 12.52% Total 5500 · Revenue - Electricity Sales 7,225,479.72 68,501,255.00 10.55% Total 5 REVENUE EARNED 8,015,549.13 70,339,255.00 11.4% Total Income 8,015,549.13 70,339,255.00 11.4%
Gross Profit 8,015,549.13 70,339,255.00 11.4%
Expense
Total 6 WHOLESALE POWER SUPPLY 5,826,453.84 61,063,849.00 9.54% Total 7 PERSONNEL EXPENSES 190,665.53 5,251,342.00 3.63% Total 8.1 FACILITIES AND OPERATIONS 163,983.07 979,125.00 16.75% Total 8.2 COMMUNICATIONS AND OUTREACH 7,721.41 114,150.00 6.76%

8.4 PROFESSIONAL & PROGRAM SRVS
8400 · Regulatory 9,538.67 164,300.00 5.81%
8410 · Contracts - Program Related Ser 204.75 1,418,600.00 0.01% 8420 · Accounting 0.00 60,000.00 0.0%
8430 · Legal 9,967.20 185,000.00 5.39%
8450 · Wholesale Services - TEA 70,476.97 817,124.00 8.63% 8460 · Procurement Credit - TEA 13,271.29 639,430.00 2.08% 8470 · Data Management - Calpine 63,826.42 855,276.00 7.46% 8480 · Customer Billing - PG&E 21,648.76 272,714.00 7.94% Total 8.4 PROFESSIONAL & PROGRAM SRVS 188,934.06 4,412,444.00 4.28% Total 8.6 INCENTIVES & REBATES 13,134.90 230,000.00 5.71% Total 9 NON OPERATING COSTS 9,735.35 129,000.00 7.55%
Total Expense 6,400,628.16 72,179,910.00 8.87%
Net Ordinary Income 1,614,920.97 -1,840,655.00 -87.74%
Net Income 1,614,920.97 -1,840,655.00 -87.74%

Page 1 of 1 ends

13 Redwood Coast Energy Authority
Balance Sheet
As of July 31, 2024
Jul 31, 24
ASSETS
Current Assets
Checking/Savings
1010 · Petty Cash 300.00
1060 · Umpqua Checking Acct 0560 425,573.37
1071 · Umpqua Deposit Cntrol Acct 8215 21,352,614.76
1075 · Umpqua Reserve Account 2300 1,700,000.00
1077 · JP Morgan Chase Act 74999 399,967.48
Total Checking/Savings 23,878,455.61
Total Accounts Receivable 300,141.74
Other Current Assets
1101 · Allowance for Doubtful Accounts -7,093,015.45
1103 · Accounts Receivable-Other 20,179,997.53
1120 · Inventory Asset 18,614.90
1205 · Prepaid Insurance 64,297.68
1210 · Retentions Receivable 25,337.96
Total Other Current Assets 13,195,232.62
Total Current Assets 37,373,829.97
Total Fixed Assets 9,579,342.36
Other Assets
1700 · Security Deposits 4,201,403.86
Total Other Assets 4,201,403.86
TOTAL ASSETS 51,154,576.19

LIABILITIES & EQUITY
Liabilities
Current Liabilities
Total Accounts Payable 4,779,427.87
Total Credit Cards 24,203.18
Other Current Liabilities
2002 · Deposits Refundable 979,170.01
2011 · NEM Escrow Liability 103,071.87
Total 2100 · Payroll Liabilities 181,345.52
Total 2200 · Accrued Expenses 13,857.36
Total Other Current Liabilities 1,277,444.76
Total Current Liabilities 6,081,075.81
Total Long Term Liabilities 5,942,119.90
Total Liabilities 12,023,195.71
Equity
3900 · Fund Balance 37,516,459.51
Net Income 1,614,920.97
Total Equity 39,131,380.48
TOTAL LIABILITIES & EQUITY 51,154,576.19

Page 1 of 1 ends

14

Page 1 ends

STAFF REPORT
Agenda Item # 4.4
AGENDA DATE: September 26, 2024
TO: Board of Directors
PREPARED BY: Jocelyn Gwynn, Senior Power Resources Manager SUBJECT: 2023 Power Source Disclosure Attestation

BACKGROUND
Each year, the Board is presented with RCEA’s power mix from the previous year that was submitted to the California Energy Commission (CEC) as part of the Power Source Disclosure (PSD) Program.

Staff submitted the 2023 PSD Report (Exhibit I to Attachment A) to the CEC by the due date. The report shows RCEA’s annual energy purchases from each generating facility from last year, and percentages of each resource type in the REpower and REpower+ products. Additionally, the PSD includes the greenhouse gas (GHG) emissions intensity of each product.

Staff will soon prepare the 2023 Power Content Label (PCL) that is to be mailed out to all current RCEA customers and submitted to the CEC this fall. The PCL includes information from the PSD Report and compares RCEA’s power content and GHG emissions to the state’s overall mix and emissions. The CEC is delayed in issuing the PCL template this year, so RCEA expects the mailers won’t go out until Q4.

SUMMARY
Staff ask that the Board adopt a resolution formally approving and attesting to the information in the 2023 PSD Report as part of the documentation required by the CEC for compliance with the PSD Program.

RCEA’s 2023 REpower power mix was about 30% renewable, 65% carbon-free large hydro, and 5% unspecified sources. In comparison, RCEA’s 2022 REpower power mix was 50% renewable, 45% carbon-free large hydro, and 5% unspecified sources. The 2023 renewable and carbon-free levels fall short of RCEA’s 2022 levels due to short-term financial challenges and delays in long-term renewable energy projects under contract coming online. However, the final 2023 numbers are better than what staff had projected in discussion with the Board earlier this year (28% renewable, 64% carbon-free, and 8% unspecified sources).

The state’s mix of renewables was 35.8% in 2022, with 2023 still being calculated. RCEA’s 2023 REpower+ 100% renewable power mix consisted of 33% solar, 33% wind, and 33% small hydro power.

ALIGNMENT WITH RCEA’S STRATEGIC PLAN
Not applicable, this is a compliance requirement.
15

Page 2 ends

EQUITY IMPACTS
Not applicable, this is a compliance requirement.

FINANCIAL IMPACT
None.

STAFF RECOMMENDATION
Adopt Resolution 2024-10 Approving and Attesting to the Veracity of RCEA’s 2023 Power Source Disclosure Report.

ATTACHMENTS
Resolution 2024-10
Exhibit A: RCEA 2023 Power Source Disclosure Report
16

Page 1 of 3 ends

RESOLUTION NO. 2024-10

A RESOLUTION OF THE BOARD OF DIRECTORS

OF THE REDWOOD COAST ENERGY AUTHORITY

APPROVING AND ATTESTING TO THE VERACITY
OF THE 2023 POWER SOURCE DISCLOSURE REPORT
WHEREAS, Senate Bill 1305 was adopted in 1997, establishing an Electricity Generation Source Disclosure (also known as Power Source Disclosure or “PSD”) Program, which requires retail suppliers of electricity to annually submit a PSD Report to the California Energy Commission (“CEC”) and to annually mail a Power Content Label (“PCL”) to their electricity customers; and WHEREAS, Redwood Coast Energy Authority (“RCEA”) is a retail supplier of electricity as defined by the PSD Program (Ca. Code of Regs., Title 20, Section 1391(r)); and WHEREAS, the PSD Regulation requiring an annual audit by an outside certified public accountant of the information in the annual PSD Report, was updated effective May 4, 2020, with an exemption from this requirement for retail suppliers that are public agencies providing electric services, provided that the governing body of the public agency approves at a public meeting the submission to the CEC of an attestation of the veracity of the annual report for each electricity product; and WHEREAS, RCEA is a public agency providing electric services; and WHEREAS, the CEC exemption therefore allows the RCEA Board of Directors to approve an attestation of the veracity of RCEA’s 2023 PSD Annual Report provided hereto as Exhibit A.

NOW, THEREFORE, the Board of Directors of the Redwood Coast Energy Authority resolves as follows:

1. The 2023 Power Source Disclosure Report provided as Exhibit A is hereby approved; and

2. The Board of Directors hereby attests to the veracity of the information presented in the 2023 Power Source Disclosure Report.

Adopted this 26th day of September 2024.

ATTEST:

Sarah Schaefer, RCEA Board Chair Lori Taketa, Clerk of the Board Date: _________________________ Date: ________________________ 17

Page 2 of 3 ends

CLERK'S CERTIFICATE
I hereby certify that the foregoing is a true and correct copy of Resolution 2024-10 passed and adopted at a regular meeting of the Redwood Coast Energy Authority, County of Humboldt, State of California, held on the 26th day of September 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTENTIONS:

Clerk of the Board, Redwood Coast Energy Authority
18

Page 3 of 3 ends

Exhibit A: RCEA 2023 Power Source Disclosure Report
19 Version: April 2024
If you have questions, contact Power Source Disclosure (PSD) staff at [email protected] or (916) 639-0573.

NOTE: Information submitted in this report is not automatically held confidential. If your company wishes the information submitted to be considered confidential an authorized representative must submit an application for confidential designation (CEC-13), which can be found on the California Energy Commissions's website at https://www.energy.ca.gov/about/divisions-and-offices/chief-counsels-office.

WEBSITE URL FOR
PCL POSTING https://redwoodenergy.org/power-resources/
Submit the Annual Report and signed Attestation in PDF format with the Excel version of the Annual Report to [email protected]. Remember to complete the Retail Supplier Name, Electricity Portfolio Name, and contact information above, and submit separate reports and attestations for each additional portfolio if multiple were offered in the previous year.

CITY, STATE, ZIP Eureka, CA 95521
PHONE 707-269-1700
EMAIL [email protected]
NAME Forrest Novotny
TITLE Power Resources Specialist
MAILING ADDRESS 633 3rd St.

CONTACT INFORMATION
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT
For the Year Ending December 31, 2023

RETAIL SUPPLIER NAME
Redwood Coast Energy Authority

ELECTRICITY PORTFOLIO NAME
REpower
Retail suppliers are required to use the posted template and are not allowed to make edits to this format. Please complete all requested information.

GENERAL INSTRUCTIONS
20 Version: April 2024
557,001
527,466
29,535
-
-
-
527,466
18,536

0.0333

DIRECTLY DELIVERED RENEWABLES
Facility Name Fuel Type
State or
Province WREGIS ID RPS ID N/A EIA ID
Gross MWh
Procured
MWh
Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions (in MT
CO2e) N/A
ABEC Bidart-Old River LLC Biomass & biowasCA W3519 62369 58699 149 - 149 149 0.6921 103 ABEC Bidart-Stockdale LLC - ABEC Bidart-Stockd Biomass & biowasCA W2971 60886 P168 6 - 6 6 1.1335 7 Potrero Hills Energy Producers - Potrero Hills Ener Biomass & biowasCA W4867 63116 59952 104 - 104 104 0.0021 0 Sunshine Gas Producers - Sunshine Gas Produce Biomass & biowasCA W4144 60815 58429 203 - 203 203 0.0033 1 Mt. Poso Cogeneration Facility - MTNPOS_1_UNITBiomass & biowasCA W1091 60695 54626 1,918 - 1,918 1,918 0.0394 76 Pacific Lumber Co. - Pacific Lumber Co. Unit 1 Biomass & biowasCA W645 60083 50049 22,318 - 22,318 22,318 0.0501 1,118 Pacific Lumber Co. - Pacific Lumber Co. Unit 2 Biomass & biowasCA W790 60083 50049 37,234 - 37,234 37,234 0.0501 1,865 Pacific Lumber Co. - Pacific Lumber Co. Unit 3 Biomass & biowasCA W791 60083 50049 52,340 - 52,340 52,340 0.0501 2,622 Sierra Pacific Burney Facility - Sierra Pacific Indus Biomass & biowasCA W667 60087 50110 143 - 143 143 0.0092 1 Sierra Pacific Ind. (Lincoln) - Sierra Pacific Industry Biomass & biowasCA W668 60088 10144 104 - 104 104 0.0109 1 Sierra Pacific Ind. (Quincy) - Sierra Pacific Industry Biomass & biowasCA W669 60089 50112 285 - 285 285 0.0479 14 Sierra Pacific Sonora - Sierra Pacific Sonora Biomass & biowasCA W852 60576 54517 35 - 35 35 0.0733 3 SPI Anderson 2 - SPI Anderson 2 Biomass & biowasCA W4674 61146 59658 227 - 227 227 0.0102 2 Stockton Biomass - Stockton Biomass Biomass & biowasCA W3540 60964 54238 587 - 587 587 0.0289 17 Mammoth Pacific L. P. (MP1) - Mammoth Pacific L Geothermal CA W417 60306 10480 115 - 115 115 0.0702 8 Mammoth Pacific L. P. I (PLES) - Mammoth Pacific Geothermal CA W416 60315 10481 208 - 208 208 0.0702 15 A. G. Wishon Powerhouse - A. G. Wishon PowerhEligible hydro CA W344 60032 293 28 - 28 28 - - Alta Powerhouse - Alta Powerhouse Eligible hydro CA W335 60033 214 4 - 4 4 - - Big Creek Hydro Project - Big Creek Water Works Eligible hydro CA W1586 60900 10282 90 - 90 90 - - Coleman Powerhouse - Coleman Powerhouse Eligible hydro CA W347 60037 227 61 - 61 61 - - Cow Creek Powerhouse - Cow Creek PowerhouseEligible hydro CA W348 60038 229 3 - 3 3 - - Crane Valley Powerhouse - Crane Valley PowerhoEligible hydro CA W349 60039 230 5 - 5 5 - - De Sabla Powerhouse - De Sabla Powerhouse Eligible hydro CA W351 60041 232 84 - 84 84 - - Deer Creek Powerhouse - Deer Creek Powerhous Eligible hydro CA W350 60040 233 18 - 18 18 - - Dutch Flat #2 Powerhouse - Dutch Flat #2 PowerhEligible hydro CA W488 60264 413 93 - 93 93 - - Dutch Flat No. 1 Powerhouse - Dutch Flat No. 1 P Eligible hydro CA W352 60042 237 199 - 199 199 - - Hat Creek No. 1 Powerhouse - Hat Creek No. 1 PoEligible hydro CA W355 60045 243 40 - 40 40 - - Hat Creek No. 2 Powerhouse - Hat Creek No. 2 PoEligible hydro CA W356 60046 244 12 - 12 12 - - Nevada Irrigation District - Bowman Hydro Project Eligible hydro CA W635 60171 50546 30 - 30 30 - - Newcastle Powerhouse - Newcastle Powerhouse Eligible hydro CA W364 60053 632 30 - 30 30 - - Phoenix Powerhouse - Phoenix Powerhouse Eligible hydro CA W366 60054 264 12 - 12 12 - - Rock Creek - Rock Creek Unit 2 Eligible hydro CA W2644 62269 275 1 - 1 1 - - Rollins Powerhouse - Rollins Powerhouse Eligible hydro CA W699 60265 34 145 - 145 145 - - Snow Mtn Hydro (Cove) - Cove Eligible hydro CA W674 60178 10707 11,882 - 11,882 11,882 - - South Powerhouse - South Powerhouse Eligible hydro CA W370 60059 280 32 - 32 32 - - Spaulding No. 1 Powerhouse - Spaulding No. 1 PoEligible hydro CA W371 60060 281 48 - 48 48 - - Spaulding No. 2 Powerhouse - Spaulding No. 2 PoEligible hydro CA W372 60061 282 21 - 21 21 - - Spaulding No. 3 Powerhouse - Spaulding No. 3 PoEligible hydro CA W373 60062 283 32 - 32 32 - - Spring Gap Powerhouse - Spring Gap Powerhous Eligible hydro CA W374 60063 284 55 - 55 55 - - Three Forks Water Power Project - Three Forks W Eligible hydro CA W758 60502 54308 26 - 26 26 - - Toadtown Powerhouse - Toadtown Powerhouse Eligible hydro CA W375 60064 714 4 - 4 4 - - Volta No. 1 Powerhouse - Volta No. 1 PowerhouseEligible hydro CA W377 60066 290 3 - 3 3 - - Volta No. 2 Powerhouse - Volta No. 2 PowerhouseEligible hydro CA W378 60067 180 5 - 5 5 - - West Point Powerhouse - West Point PowerhouseEligible hydro CA W379 60068 291 147 - 147 147 - - Retail Sales (MWh)
Net Specified Procurement (MWh)
Unspecified Power (MWh)
Procurement to be adjusted
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT
SCHEDULE 1: PROCUREMENTS AND RETAIL SALES
For the Year Ending December 31, 2023
Redwood Coast Energy Authority
REpower
GHG Emissions Intensity (in MT CO2e/MWh)
Net Specified Natural Gas
Net Specified Coal & Other Fossil Fuels
Net Specified Nuclear, Large Hydro, Renewables, and ACS Power GHG Emissions (excludes grandfathered emissions)
Instructions: Enter information about power procurements underlying this electricity portfolio for which your company is filing the Annual Report.

Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto-populate as needed and should not be filled out. For EIA IDs for unspecified power or specified system mixes from asset-controlling suppliers, enter "Unspecified Power", "BPA", or "Tacoma Power" as applicable. For specified procurements of ACS power, use the ACS Procurement Calculator to calculate the resource breakdown comprising the ACS system mix. Procurements of unspecified power must not be entered as line items below; unspecified power will be calculated automatically in cell N9. Unbundled RECs must not be entered on Schedule 1; these products must be entered on Schedule 2. At the bottom portion of the schedule, provide the other electricity end-uses that are not retail sales including, but not limited to transmission and distribution losses or municipal street lighting. Amounts should be in megawatt-hours. 21 Version: April 2024
Wise No. 1 Powerhouse - Wise No. 1 PowerhouseEligible hydro CA W380 60069 292 116 - 116 116 - -
Rock Creek - Rock Creek Unit 1 Eligible hydro CA W2643 62269 50987 29 - 29 29 - - Rock Creek - Rock Creek Unit 2 Eligible hydro CA W2644 62269 10809 43 - 43 43 - - Agua Caliente Solar - Block 1 Solar AZ W2427 60894 57373 118 - 118 118 - - Agua Caliente Solar - Block 10 Solar AZ W3621 60894 57373 99 - 99 99 - - Agua Caliente Solar - Block 11 Solar AZ W3829 60894 57373 99 - 99 99 - - Agua Caliente Solar - Block 12 Solar AZ W3953 60894 57373 44 - 44 44 - - Agua Caliente Solar - Block 2 Solar AZ W2576 60894 57373 118 - 118 118 - - Agua Caliente Solar - Block 3 Solar AZ W2668 60894 57373 118 - 118 118 - - Agua Caliente Solar - Block 4 Solar AZ W2782 60894 57373 84 - 84 84
- -
Agua Caliente Solar - Block 5 Solar AZ W2838 60894 57373 118 - 118 118 - - Agua Caliente Solar - Block 6 Solar AZ W2844 60894 57373 118 - 118 118 - - Agua Caliente Solar - Block 7 Solar AZ W2925 60894 57373 118 - 118 118
- -
Agua Caliente Solar - Block 8 Solar AZ W3240 60894 57373 99 - 99 99 - - Agua Caliente Solar - Block 9 Solar AZ W2812 60894 57373 99 - 99 99 - - Alamo Solar - Alamo Solar Solar CA W4546 61453 59469 87 - 87 87 - - Antelope West Solar - Antelope West Solar Solar CA W4322 61850 58626 106 - 106 106 - - Atwell Island - Atwell Island PV Solar Generating FSolar CA W3159 60947 58366 60 - 60 60 - - AV Solar Ranch 1, LLC - Antelope Solar Ranch - B Solar CA W3474 60790 57378 116 - 116 116 - - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Solar CA W4141 60790 57378 189 - 189 189 - - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Solar CA W2803 60790 57378 112 - 112 112 - - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Solar CA W3274 60790 57378 126 - 126 126 - - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Solar CA W3275 60790 57378 79 - 79 79 - - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Solar CA W3280 60790 57378 65 - 65 65 - - AV Solar Ranch 1, LLC - AVSR1 - Antelope Solar Solar CA W3849 60790 57378 212 - 212 212 - - Avenal Park - Avenal Park LLC Solar CA W2074 60912 57359 96 - 96 96 - - Bakersfield Solar - SKIC 20 Solar CA W4550 61558 61117 90 - 90 90 - - Bayshore Solar A - Big Sky Solar 6 Solar CA W5731 63133 60481 94 - 94 94 - - Bayshore Solar B - Big Sky Solar 7 Solar CA W5737 63134 60474 89 - 89 89 - - Bayshore Solar C - Big Sky Solar 8 Solar CA W5738 63135 60475 91 - 91 91 - - Blackwell Solar - Blackwell Solar, LLC Solar CA W4587 61892 59524 54 - 54 54 - - CA Flats 150 - CA Flats 150 Solar CA W7112 62552 60034 59 - 59 59 - - California Valley Solar Ranch - Block1 Solar CA W2847 60603 57439 97 - 97 97
- -
California Valley Solar Ranch - Block2 Solar CA W3106 60603 57439 276 - 276 276 - - California Valley Solar Ranch - Block3 Solar CA W3111 60603 57439 553 - 553 553 - - California Valley Solar Ranch - Block4 Solar CA W3187 60603 57439 206 - 206 206
- -
CalRENEW-1 - CalRENEW-1 Solar CA W1519 60475 56768 23 - 23 23 - - Cantua Solar Station - Cantua Solar Station Solar CA W2580 61823 57522 67 - 67 67 - - CED Corcoran - CED Corcoran Solar CA W3408 60948 58374 63 - 63 63 - - CED White River Solar - CED White River Solar Solar CA W3406 60949 58373 81 - 81 81 - - CID Solar - Corcoran Irrigation District - CID Solar, Solar CA W4227 62285 59183 77 - 77 77 - - CM10 - CM10 Solar NV W883 60713 56944 162 - 162 162 - - CM48 - CM48 Solar NV W1460 60786 57205 266 - 266 266 - - Copper Mountain Solar 2 - CMS 2 (1) Solar NV W2818 60990 58017 152 - 152 152 - - Copper Mountain Solar 2 - CMS 2 (2) Solar NV W2943 60990 58017 135 - 135 135 - - Copper Mountain Solar 2 - CMS 2 (3) Solar NV W3201 60990 58017 135 - 135 135 - - Copper Mountain Solar 2 - CMS 2 (4) Solar NV W4555 60990 58017 135 - 135 135 - - Copper Mountain Solar 2 - CMS 2 (5) Solar NV W4589 60990 58017 159 - 159 159 - - Cuyama Solar - Cuyama Solar Solar CA W5611 61891 60043 150 - 150 150
- -
DESERT SUNLIGHT 300, LLC - DSL-BLK01 - 04 Solar CA W3793 61068 57993 599 - 599 599 - - DESERT SUNLIGHT 300, LLC - DSL-BLK05 & 06 Solar CA W3798 61068 57993 196 - 196 196 - - DESERT SUNLIGHT 300, LLC - DSL-BLK07 & 08 Solar CA W3800 61068 57993 94 - 94 94 - - DESERT SUNLIGHT 300, LLC - DSL-BLK09 Solar CA W3801 61068 57993 117 - 117 117 - - DESERT SUNLIGHT 300, LLC - DSL-BLK10 & 11 Solar CA W3783 61068 57993 196 - 196 196 - - Five Points Solar Station - Five Points Solar Statio Solar CA W2201 61432 59523 33 - 33 33 - - Gates Solar Station - Gates Solar Station Solar CA W3477 62353 57892 75 - 75 75 - - GENESIS SOLAR, LLC - SGN-1 Solar CA W3790 60605 57394 573 - 573 573 - - GENESIS SOLAR, LLC - SGN2 Solar CA W3791 60605 57394 556 - 556 556 - - Giffen Solar Station - Giffen Solar Station Solar CA W2581 61822 59522 26 - 26 26 - - Guernsey Solar Station - Guernsey Solar Station Solar CA W3476 62354 58975 48 - 48 48 - - Henrietta Solar Plant - Parrey, LLC Solar CA W5056 61841 58975 130 - 130 130 - - Huron Solar Station - Huron Solar Station Solar CA W2579 61821 57523 62 - 62 62 - - Ivanpah - Unit 1 Solar CA W3189 62273 57073 412
- 412 412 0.0596 25
Ivanpah - Unit 3 Solar CA W3190 62275 57075 305 - 305 305 0.0596 18 22 Version: April 2024
Java Solar Solar CA W13698 63137 P368 46 - 46 46 - -
Kansas - Kansas Solar CA W4192 61263 58985 77 - 77 77 - - Kent South - Kent South Solar CA W4193 61262 58991 82 - 82 82 - - Lost Hills - Lost Hills Solar, LLC Solar CA W4586 61893 58712 98 - 98 98 - - Mesquite Solar 1 (10) - Mesquite Solar 1 (10) Solar AZ W3205 60875 57707 60 - 60 60 - - Mesquite Solar 1 (11) - Mesquite Solar 1 (11) Solar AZ W3130 60875 57707 67 - 67 67 - - Mesquite Solar 1 (12) - Mesquite Solar 1 (12) - Me Solar AZ W3183 60875 57707 67 - 67 67 - - Mesquite Solar 1 (1-3) - Mesquite Solar 1 (1-3) Solar AZ W2399 60875 57707 180 - 180 180 - - Mesquite Solar 1 (4) - Mesquite Solar 1 (4) Solar AZ W2755 60875 57707 67 - 67 67 - - Mesquite Solar 1 (5) - Mesquite Solar 1 (5) Solar AZ W2784 60875 57707 67 - 67 67 - - Mesquite Solar 1 (6) - Mesquite Solar 1 (6) Solar AZ W2807 60875 57707 33 - 33 33 - - Mesquite Solar 1 (7) - Mesquite Solar 1 (7) Solar AZ W2841 60875 57707 67 - 67 67 - - Mesquite Solar 1 (8) - Mesquite Solar 1 (8) Solar AZ W2871 60875 57707 50 - 50 50 - - Mesquite Solar 1 (9) - Mesquite Solar 1 (9) Solar AZ W3095 60875 57707 67 - 67 67 - - Michael E. Bowler Memorial Solar Farm - Westland Solar CA W3963 61755 58616 79 - 79 79 - - Midway Solar Farm I - Midway Solar Farm I Solar CA W5367 61295 60336 246 - 246 246 - - Mojave Solar Project - Mojave Solar Project - Alph Solar CA W4255 60848 57331 550 - 550 550 - - Mojave Solar Project - Mojave Solar Project - Beta Solar CA W4450 60848 57331 550 - 550 550 - - North Star Solar - North Star Solar, LLC Solar CA W4629 61198 58713 244 - 244 244 - - Old River One - Old River One Solar CA W4194 60853 58986 69 - 69 69 - - Orion Solar I - Orion Solar I, LLC Solar CA W3981 61570 58718 58 - 58 58 - - Portal Ridge Solar C - Portal Ridge Solar C Solar CA W5211 61684 60311 34 - 34 34 - - RE Astoria 1 - RE Astoria 1 Solar CA W4930 62284 59976 127 - 127 127 - - RE Kansas South - RE Kansas South Solar CA W3109 61264 58148 102 - 102 102 - - Sand Drag - Sand Drag LLC Solar CA W2072 60914 57361 303 - 303 303 - - Shafter Solar, LLC - Shafter Solar, LLC Solar CA W4680 62325 59408 33 - 33 33 - - Solar Alpine LLC - Solar Alpine LLC Solar CA W2872 60755 57295 254 - 254 254 - - SPS Alpaugh 50 - SPS Alpaugh 50 Solar CA W2826 60945 58003 131 - 131 131 - - SPS Alpaugh North - SPS Alpaugh North Solar CA W2825 60946 58002 41 - 41 41 - - Stroud Solar Station - Stroud Solar Station Solar CA W2203 61434 57497 44 - 44 44 - - Sun City Project LLC - Sun City Solar CA W2073 60913 57360 93 - 93 93 - - Sunray 2- SEGS II - Sunray 2- SEGS II Solar CA W466 62694 10437 110 - 110 110 - - Topaz Solar Farms LLC - Topaz 10-16 Solar CA W3226 61698 57695 591 - 591 591 - - Topaz Solar Farms LLC - Topaz 17 - 20 Solar CA W3227 61698 57695 322 - 322 322 - - Topaz Solar Farms LLC - Topaz 1-9 Solar CA W3193 61698 57695 816 - 816 816 - - Topaz Solar Farms LLC - Topaz 21 - 22 Solar CA W3229 61698 57695 158 - 158 158 - - Vaca Dixon Solar Station - Vaca Dixon Solar StatioSolar CA W1455 60966 57041 6 - 6 6 - - West Gates Solar Station - West Gates Solar Stat Solar CA W3478 62352 58206 40 - 40 40 - - Western Antelope Blue Sky Ranch A - WABSRA Solar CA W4264 61517 58626 89 - 89 89 - - Westside Solar Station - Westside Solar Station Solar CA W2202 61433 57499 33 - 33 33 - - Blackspring Ridge 1A - Blackspring Ridge 1A Wind Wind AB W3978 60987 P200 832 - 832 832 - - Blackspring Ridge 1B - Blackspring Ridge 1B Wind Wind AB W3979 60988 P201 906 - 906 906 - - Coram Brodie Wind Project - Brookfield Tehachap Wind CA W2773 60973 54750 1,983 - 1,983 1,983 - - Diablo Winds, LLC - Diablo Winds, LLC Wind CA W762 60030 56271 357 - 357 357 - - FPL Energy Montezuma Wind - FPL Energy Monte Wind CA W1745 60543 57201 164 - 164 164 - - Halkirk I Wind Facility - Halkirk I Wind Facility Wind AB W2900 60989 P208 4,080 - 4,080 4,080 - - Hatchet Ridge - Hatchet Ridge Wind CA W1600 60741 56654 2,232 - 2,232 2,232 - - Klondike III - Klondike Wind Power III LLC Wind OR W237 60602 56468 375 - 375 375 - - Montezuma Wind II - Nextera Energy Montezuma Wind CA W2400 61345 57701 353 - 353 353 - - North Sky River - North Sky River - Phase I Wind CA W3206 61385 58154 773 - 773 773 - - Rattlesnake Road - Rattlesnake Road Wind OR W805 60553 62936 1,616 - 1,616 1,616 - - Rising Tree Wind Farm II LLC - Rising Tree Wind Wind CA W4445 62426 57621 96 - 96 96 - - Shiloh III Wind Project, LLC - Shiloh III Wind Proje Wind CA W2142 61069 57586 2,480 - 2,480 2,480 - - Shiloh IV Wind Project, LLC - Shiloh IV Wind Proj Wind CA W2780 61617 57725 588 - 588 588 - - Shiloh Wind Project 2, LLC - Shiloh Wind Project 2 Wind CA W811 60639 56874 1,580 - 1,580 1,580 - - Tehachapi Wind Resource II - Pajuela Peak - Teha Wind CA W508 61468 54909 322 - 322 322 - - Vantage - Vantage Wind Energy LLC Wind WA W2046 60712 57188 2,084 - 2,084 2,084 - - Vasco Winds - Vasco Winds Wind CA W2401 61344 57700 388 - 388 388 - -

FIRMED-AND-SHAPED IMPORTS
Facility Name Fuel Type
State or
Province WREGIS ID RPS ID
EIA ID of
REC
Source
EIA ID of
Substitute
Power
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e)
Eligible for
Grandfathered
Emissions?
- - #N/A
- - #N/A
23 Version: April 2024
- - #N/A
- - #N/A
- - #N/A

SPECIFIED NON-RENEWABLE PROCUREMENTS
Facility Name Fuel Type
State or
Province N/A N/A N/A EIA ID
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e) N/A
Balch #1 PH Large hydro CA 217 1,645 1,645 1,645 - -
Balch #2 PH Large hydro CA 218 4,186 4,186 4,186 - -
Belden Large hydro CA 219 2,186 2,186 2,186 - -
Bucks Creek Large hydro CA 220 650 650 650 - -
Butt Valley Large hydro CA 221 1,253 1,253 1,253 - -
Caribou 1 Large hydro CA 222 1,686 1,686 1,686 - -
Caribou 2 Large hydro CA 223 3,926 3,926 3,926 - -
Cresta Large hydro CA 231 1,035 1,035 1,035 - -
Drum #1 Large hydro CA 235 782 782 782 - -
Drum #2 Large hydro CA 236 2,487 2,487 2,487 - -
Electra Large hydro CA 239 3,531 3,531 3,531 - -
Haas Large hydro CA 240 4,293 4,293 4,293 - -
James B Black Large hydro CA 249 4,161 4,161 4,161 - -
Kerckhoff #2 PH Large hydro CA 682 4,487 4,487 4,487 - - Kings River Large hydro CA 254 1,759 1,759 1,759 - -
Pit 1 Large hydro CA 265 1,806 1,806 1,806 - -
Pit 3 Large hydro CA 266 3,222 3,222 3,222 - -
Pit 4 Large hydro CA 267 3,753 3,753 3,753 - -
Pit 5 Large hydro CA 268 6,550 6,550 6,550 - -
Pit 6 Large hydro CA 269 2,366 2,366 2,366 - -
Pit 7 Large hydro CA 270 2,485 2,485 2,485 - -
Poe Large hydro CA 272 6,024 6,024 6,024 - -
Rock Large hydro CA 275 4,081 4,081 4,081 - -
Salt Springs Large hydro CA 279 1,850 1,850 1,850 - -
Stanislaus Large hydro CA 285 3,090 3,090 3,090 - -
Tiger Creek Large hydro CA 287 2,178 2,178 2,178 - -
NID
‐
Chicago Park Large hydro CA 412 1,245 1,245 1,245 - -
Middle Fork/Ralston Large hydro CA 425 250,000 250,000 250,000 - - Colgate Unit 1 Large hydro CA 454 7,574 7,574 7,574 - - Holm Hydro Unit 2 Large hydro 380 20,000 20,000 20,000 - - Colgate Unit 2 Large hydro CA 454 7,425 7,425 7,425 - -

PROCUREMENTS FROM ASSET-CONTROLLING SUPPLIERS
Facility Name Fuel Type N/A N/A N/A N/A EIA ID
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e) N/A
- #N/A
- #N/A
- #N/A
- #N/A
END USES OTHER THAN RETAIL SALES MWh
24 Version: April 2024
Adjusted Net
Procured (MWh)
Percent of Total
Retail Sales
Renewable Procurements 165,750 29.8%
Biomass & Biowaste 115,653 20.8%
Geothermal 323 0.1%
Eligible Hydroelectric 13,298 2.4%
Solar 15,267 2.7%
Wind 21,209 3.8%
Coal - 0.0%
Large Hydroelectric 361,716 64.9%
Natural gas - 0.0%
Nuclear - 0.0%
Other - 0.0%
Unspecified Power 29,535 5.3%
Total 557,001 100.0%
557,001
73 0.0%
Total Retail Sales (MWh)
GHG Emissions Intensity (converted to lbs CO2e/MWh)
Percentage of Retail Sales Covered by Retired Unbundled RECs
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT
SCHEDULE 3: POWER CONTENT LABEL DATA
For the Year Ending December 31, 2023
Redwood Coast Energy Authority
REpower
Instructions: No data input is needed on this schedule. Retail suppliers should use these auto-populated calculations to fill out their Power Content Labels. 25 Version: April 2024
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT

ATTESTATION FORM
For the Year Ending December 31, 2023
Redwood Coast Energy Authority
REpower
I, Forrest Novotny, Power Resource Specialist, declare under penalty of perjury, that the information provided in this report is true and correct, subject to modification following audit and resolution of the WREGIS software issues, and that I, as an authorized agent of Redwood Coast Energy Authority, have authority to submit this report on the retail supplier's behalf. I further declare that all of the electricity claimed as specified purchases as shown in this report was sold once and only once to retail customers.

Name: Forrest Novotny
Representing: Redwood Coast Energy Authority
Signature:

Dated: 8/26/2024
Executed at: 633 3rd Street, Eureka, CA 95501
26 Version: April 2024
If you have questions, contact Power Source Disclosure (PSD) staff at [email protected] or (916) 639-0573.

NOTE: Information submitted in this report is not automatically held confidential. If your company wishes the information submitted to be considered confidential an authorized representative must submit an application for confidential designation (CEC-13), which can be found on the California Energy Commissions's website at https://www.energy.ca.gov/about/divisions-and-offices/chief-counsels-office.

WEBSITE URL FOR
PCL POSTING redwoodenergy.org/power-resources
Submit the Annual Report and signed Attestation in PDF format with the Excel version of the Annual Report to [email protected]. Remember to complete the Retail Supplier Name, Electricity Portfolio Name, and contact information above, and submit separate reports and attestations for each additional portfolio if multiple were offered in the previous year.

CITY, STATE, ZIP Eureka, CA, 95501
PHONE 707-269-1700
EMAIL [email protected]
NAME Forrest Novotny
TITLE Power Resources Specialist
MAILING ADDRESS 633 3rd St.

CONTACT INFORMATION
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT
For the Year Ending December 31, 2023

RETAIL SUPPLIER NAME
Redwood Coast Energy Authority

ELECTRICITY PORTFOLIO NAME
REpower+
Retail suppliers are required to use the posted template and are not allowed to make edits to this format. Please complete all requested information.

GENERAL INSTRUCTIONS
27 Version: April 2024
6,909
6,909
-
-
-
-
6,909
0 0.0000

DIRECTLY DELIVERED RENEWABLES
Facility Name Fuel Type
State or
Province WREGIS ID RPS ID N/A EIA ID
Gross MWh
Procured
MWh
Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions (in
MT CO2e) N/A
CA Flats 150 - CA Flats 150 Solar CA W7112 62552 60034 550 550 550 - - CM48 - CM48 Solar NV W1460 60786 57205 578 578 578 - -
Henrietta Solar Plant - Parrey, LLC Solar CA W5056 61841 58975 338 338 338 - - RE Astoria 1 - RE Astoria 1 Solar CA W4930 62284 59976 400 400 400 - - Redwood Coast Airport Microgrid - Redwood Coas Solar CA W12135 64947 64766 219 219 219 - - Sun City Project LLC - Sun City Solar CA W2073 60913 57360 218 218 218 - - Shiloh Wind Project 2, LLC - Shiloh Wind Project 2 Wind CA W811 60639 56874 2,303 2,303 2,303 - - Snow Mtn Hydro (Cove) - Cove Eligible hydro CA W674 60178 10707 2,303 2,303 2,303 - -

FIRMED-AND-SHAPED IMPORTS
Facility Name Fuel Type
State or
Province WREGIS ID RPS ID
EIA ID of
REC
Source
EIA ID of
Substitute
Power
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e)
Eligible for
Grandfathered
Emissions?
- - #N/A
- - #N/A
- - #N/A
- - #N/A
- - #N/A

SPECIFIED NON-RENEWABLE PROCUREMENTS
Facility Name Fuel Type
State or
Province N/A N/A N/A EIA ID
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e) N/A
- - #N/A
- - #N/A
- - #N/A
- - #N/A
- - #N/A
- - #N/A
- - #N/A
- - #N/A
- - #N/A

PROCUREMENTS FROM ASSET-CONTROLLING SUPPLIERS
Facility Name Fuel Type N/A N/A N/A N/A EIA ID
Gross MWh
Procured MWh Resold
Net MWh
Procured
Adjusted Net MWh
Procured
GHG Emissions
Factor (in MT
CO2e/MWh)
GHG Emissions
(in MT CO2e) N/A
- #N/A
- #N/A
- #N/A
- #N/A
END USES OTHER THAN RETAIL SALES MWh
Retail Sales (MWh)
Net Specified Procurement (MWh)
Unspecified Power (MWh)
Procurement to be adjusted
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT
SCHEDULE 1: PROCUREMENTS AND RETAIL SALES
For the Year Ending December 31, 2023
Redwood Coast Energy Authority
REpower+
GHG Emissions Intensity (in MT CO2e/MWh)
Net Specified Natural Gas
Net Specified Coal & Other Fossil Fuels
Net Specified Nuclear, Large Hydro, Renewables, and ACS Power GHG Emissions (excludes grandfathered emissions)
Instructions: Enter information about power procurements underlying this electricity portfolio for which your company is filing the Annual Report.

Insert additional rows as needed. All fields in white should be filled out. Fields in grey auto-populate as needed and should not be filled out. For EIA IDs for unspecified power or specified system mixes from asset-controlling suppliers, enter "Unspecified Power", "BPA", or "Tacoma Power" as applicable. For specified procurements of ACS power, use the ACS Procurement Calculator to calculate the resource breakdown comprising the ACS system mix. Procurements of unspecified power must not be entered as line items below; unspecified power will be calculated automatically in cell N9. Unbundled RECs must not be entered on Schedule 1; these products must be entered on Schedule 2. At the bottom portion of the schedule, provide the other electricity end-uses that are not retail sales including, but not limited to transmission and distribution losses or municipal street lighting. Amounts should be in megawatt-hours. 28 Version: April 2024
Adjusted Net
Procured (MWh)
Percent of Total
Retail Sales
Renewable Procurements 6,909 100.0%
Biomass & Biowaste - 0.0%
Geothermal - 0.0%
Eligible Hydroelectric 2,303 33.3%
Solar 2,303 33.3%
Wind 2,303 33.3%
Coal - 0.0%
Large Hydroelectric - 0.0%
Natural gas - 0.0%
Nuclear - 0.0%
Other - 0.0%
Unspecified Power - 0.0%
Total 6,909 100.0%
6,909
-

0.0%
Total Retail Sales (MWh)
GHG Emissions Intensity (converted to lbs CO2e/MWh)
Percentage of Retail Sales Covered by Retired Unbundled RECs
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT
SCHEDULE 3: POWER CONTENT LABEL DATA
For the Year Ending December 31, 2023
Redwood Coast Energy Authority
REpower+
Instructions: No data input is needed on this schedule. Retail suppliers should use these auto-populated calculations to fill out their Power Content Labels. 29 Version: April 2024
2023 POWER SOURCE DISCLOSURE ANNUAL REPORT

ATTESTATION FORM
For the Year Ending December 31, 2023
Redwood Coast Energy Authority
REpower+
I, Forrest Novotny, Power Resource Specialist, declare under penalty of perjury, that the information provided in this report is true and correct, subject to modification following audit and resolution of the WREGIS software issues, and that I, as an authorized agent of Redwood Coast Energy Authority, have authority to submit this report on the retail supplier's behalf. I further declare that all of the electricity claimed as specified purchases as shown in this report was sold once and only once to retail customers.

Name: Forrest Novotny
Representing: Redwood Coast Energy Authority
Signature:

Dated: 8/26/2024
Executed at: 633 3rd Street, Eureka, CA 95501
30

Page 1 ends

STAFF REPORT
Agenda Item #4.5
AGENDA DATE: September 26, 2024
TO: Board of Directors
PREPARED BY: Lori Biondini, Director Business Planning and Finance SUBJECT: Procurement Policy, Investment Policy and Financial Management Policy Update

SUMMARY
Staff has been working closely with RCEA General Counsel on drafting two new financially related policies for RCEA. Staff referenced applicable California government codes provided by General Counsel in addition to best practices of other Joint Powers Authorities and Community Choice Aggregators when writing and settling on the attached versions.

The first is a Procurement Policy to provide guidelines for purchasing activities, including soliciting and contracting. The policy designates a Purchasing Agent for RCEA and sets the Agent’s spending authority at $50,000 per individual vendor/contractor, per year. The policy also describes standards of conduct, authorized procurement methods, and public contracting procedures. The policy also states a preference for environmentally beneficial and local purchasing, with definitions.

The second is an Investment Policy to provide guidelines for the management of RCEA funds, including cash, deposits and investments. The policy describes investment objectives, standard of care and authority for management of funds, and lists the authorized investments that Staff is recommending. Within the investments permitted by California Government Code, staff chose a narrowed list to include in this policy based on the likelihood of such investments being made, but the list can be expanded in the future through a policy update, if needed.

The Board adopted a Financial Management Policy in June 2017, and subsequent updates in December 2021, which defines financial responsibilities, including authorizing the Executive Director’s spending authority at $20,000 per vendor/contractor, per year. If the Procurement Policy is adopted as presented, the Financial Management Policy should be updated to reflect the increase of ED spending authority to $50,000.

RECOMMENDED ACTIONS:

Adopt Resolution 2024-11 adopting a Procurement Policy, Investment Policy and amending the Financial Management Policy.

ATTACHMENT:

Resolution 2024-11, including associated policies.
31

Page 1 of 3 ends

RESOLUTION NO. 2024-11

A RESOLUTION OF THE BOARD OF DIRECTORS

OF THE REDWOOD COAST ENERGY AUTHORITY

AMENDING THE RCEA FINANCIAL MANAGEMENT POLICY, ADOPTING A

PROCUREMENT POLICY, AND ADOPTING AN INVESTMENT POLICY
WHEREAS, RCEA is committed to implementing and maintaining a robust set of policies that align with local government best practices to support RCEA’s effectiveness and establish a solid organizational foundation for RCEA’s programs and projects; and WHEREAS, the RCEA Board of Directors wishes to establish processes to ensure that RCEA’s finances are managed transparently, efficiently, and with responsible stewardship; and WHEREAS, since the adoption of the RCEA Financial Policy in 2017, the agency’s procurement needs, funds, and cash management responsibilities have grown.

NOW THEREFORE, BE IT RESOLVED that the Board of Directors of the Redwood Coast Energy Authority hereby adopts the following Procurement Policy, Investment Policy, and amended RCEA Financial Management Policy as set forth in Appendix A attached.

Adopted this ____ day of _________________, 2024
ATTEST:
______________________________ ____________________________ Sarah Schaefer, RCEA Board Chair Lori Taketa, Clerk of the Board Date: _________________________ Date: ________________________ 32

Page 2 of 3 ends

CLERK'S CERTIFICATE
I hereby certify that the foregoing is a true and correct copy of Resolution No. 2024-11 passed and adopted at a regular meeting of the Redwood Coast Energy Authority, County of Humboldt, State of California, held on the ____ day of __________________, 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTENTIONS:

Clerk of the Board, Redwood Coast Energy Authority
33

Page 3 of 3 ends

Appendix A
Amended Redwood Coast Energy Authority Financial Management Policy, RCEA Procurement Policy, and RCEA Investment Policy 34 REDWOOD COAST ENERGY AUTHORITY

PROCUREMENT POLICY

1.0 GENERAL PROVISIONS

1.1 Purpose1 The purpose of this Procurement Policy is to establish clear guidelines for authorization, soliciting, and appropriate conduct of purchasing activities relating to the acquisition of approved goods and services. This policy is intended to promote impartial, transparent, and fair processes that seek to provide the best value for RCEA and ensure compliance with federal and state requirements. All purchases must be made in accordance with this policy, other RCEA policies and procedures, as well as any and all applicable laws and are subject to audit at any time.

1.2 Purchasing Agent2

1.2.1 Designation. The Executive Director is designated the Purchasing Agent for RCEA. As Purchasing Agent, the Executive Director may, in accordance with all requirements of this Policy, purchase supplies, materials, equipment and goods, and contract for services and public works projects. No less frequently than annually, the Executive Director shall prepare procedures to implement the Procurement policy, including naming any designees and/or setting contract approval authority and spending limits for Department Directors and other RCEA employees.

1.2.2 Limit of Spending Authority. Except as otherwise specified in this Policy or approved by the Board of Directors, the Executive Director is authorized to purchase supplies, materials, equipment and goods, and contract for services and public works projects up to and including $50,000.00. The Board of Directors shall approve the procurement of all supplies, materials, equipment and goods, and contract for services and public works projects that exceed $50,000.00.

1.3 Other Responsibilities

1.3.1 Finance Director. Assists the Purchasing Agent with the following:

1.3.1.1 Prepare, maintain, and amend procedures to implement the Procurement Policy.

1.3.1.2 Help departments in matters related to identifying supply sources, examining alternative products, order follow-up, and adherence to contract terms and conditions.

1.3.1.3 Determining the appropriate method of acquisition and solicitation.

1.3.1.4 Purchasing, rent, or lease of supplies, equipment and services.

1.3.1.5 Sell, lease, trade, or otherwise dispose of property that is no longer needed for RCEA use.

1.3.1.6 Registration of any equipment

1.3.2 Department Directors. Assists the Purchasing Agent and/or designees with the following:
1 Public Contract Code §§100, 20150.5; Government Code §§25508, 54202 2 Government Code §§25500 et seq.; Public Contract Code §20132 35 Procurement Policy, 2024

Page 2 ends

1.3.2.1 Ensure that all purchases within their department are made for RCEA business and make appropriate use of RCEA funds.

1.3.2.2 Submit requests for the acquisition of goods and services in a manner suitable to the type of solicitation required.

1.3.2.3 Assure all requests are properly budgeted.

1.3.2.4 Provide adequate descriptions, specifications, scopes of work, or other instructions to assure a clear understanding of the requirements, including special conditions required by any grant or outside funding source to be used for the purchase.

1.3.2.5 Provide punctual responses to questions throughout the procurement process.

1.3.2.6 Provide adequate inspection, receiving, and quality control practices for all purchases.

1.3.2.7 Assure receipt and payment are consistent with the approved contract and payment terms.

1.3.2.8 Consult with the Finance Director and Purchasing Agent as needed for assistance with resolving problems with product or service delivery and vendor performance.

2.0 STANDARDS OF CONDUCT FOR PURCHASING AND PROCUREMENT ACTIVITIES3

2.1 Policy Statement. It is RCEA’s policy to promote government integrity and guard against the actual and appearance of impropriety by prescribing the following standards of ethical conduct for all procurement and purchasing activities. All employees shall adhere to following standards of conduct when engaged in any procurement activities.

2.1.1 Employees shall discharge their duties impartially so as to assure fair competitive access to governmental procurement by responsible contractors and to foster public confidence in the integrity of RCEA’s procurement system.

2.1.2 Employees shall not solicit, demand, accept or agree to accept a gratuity, an offer of employment or any other benefit in connection with any decision, approval, disapproval, recommendation, or preparation of any part of a program requirement, specification, standard, solicitation or contract.

2.1.3 Employees shall not participate directly or indirectly in a procurement when the employee knows that:
• The employee or any member of the employee's immediate family has a personal financial interest pertaining to the procurement; • A business or organization in which the employee, or any member of the employee's immediate family, has a personal financial interest pertaining to the procurement; or
• Any other person, business or organization with which the employee or any member of the employee's immediate family is negotiating or has an arrangement concerning employment is involved in the procurement. 3 Government Code §§4525 et seq., 4529.10 et seq.
36 Procurement Policy, 2024

Page 3 ends

2.2 Discovery of an Actual or Potential Conflict of Interest. Upon discovery of an actual or potential conflict of interest, an employee shall promptly withdraw from further participation in the transaction involved and notify their immediate supervisor. The supervisor will consult with their director (or in the case of an actual or potential conflict of the Executive Director, with RCEA General Counsel) to determine whether an actual or potential conflict of interest exists and the appropriate mitigation if necessary. If there is a possibility that participation would create an appearance of conflict but not an actual or potential conflict, the Director shall consult with the Executive Director and General Counsel for direction on how to mitigate such appearance of conflict. In the case of an appearance of a conflict of interest by the Executive Director, the Executive Director shall consult with the Chair of the Board of Directors and General Counsel for direction on how to mitigate such appearance of conflict.

2.3 Discipline for Violation. The violation of any of these Standards will subject the violator to disciplinary action deemed appropriate by the Executive Director, up to and including dismissal.

2.4 Supplier, Contractor Ethics

2.4.1 It shall be a violation of ethical standards for any third party to offer, give, or agree to give any RCEA employee a gratuity, an offer of employment or any other benefit in connection with any RCEA decision, approval, disapproval, recommendation, specification, standard, solicitation or contract.

2.4.2 It shall be a violation of ethical standards for any person or firm to present false documents to RCEA or falsely represent its firm.

2.4.3 Suppliers and contractors shall exercise reasonable care and diligence to prevent any actions or conditions that could result in a conflict with RCEA’s best interests. This obligation shall apply to suppliers’ and contractors’ employees, agents, subcontractors, and third parties associated with accomplishing work for RCEA.

2.4.4 A violation of Supplier, Contractor Ethics may result in disqualification of the third party, or other parties involved in the conduct, from consideration of any procurement awards.

2.4.5 Any prospective contractor who develops or drafts specifications, requirements, statements of work, or other documents relevant to a particular procurement is excluded from competing for such procurements.

2.5 Personal Purchases. RCEA employees shall not make personal purchases, or cause them to be made, through RCEA's procurement system unless such purchases have been authorized by the Board as a special program available to all RCEA employees.

3.0 PROCUREMENT METHODS

3.1 Competitive Procurement. It is RCEA’s responsibility to make appropriate use of public and rate-payer funds and promote transparency through the use of open and full competition to the maximum extent possible. Contracts for the purchase of goods and services shall be awarded as the result of a competitive process, except as otherwise 37 Procurement Policy, 2024

Page 4 ends

provided for in this policy or by law. Purchases shall not be artificially divided to circumvent any competitive bidding requirement. In addition, no department or employee shall draft or cause to be drafted any specifications in such a manner as to limit the bidding directly or indirectly to any one specific vendor or any specific brand, product, thing, or service, except for those items that are standardized for a particular purpose, are approved as exempt from competitive bidding requirements, or are approved as sole source purchases.

3.1.1 Dollar Thresholds for Purchases The following thresholds apply to procurement activities for the purchase of any goods or services required by RCEA departments where a competitive process is required, except for public projects:
• Mid-Sized Purchases. Purchases of supplies or equipment where the amount is more than $4,000 but not expected to exceed $10,000 require at least three quotes. Acceptance of a quote that is not the lowest cost is permissible when supported with written justification that the supplier provides best value for RCEA based on specified reasons such as time constraints, past performance, or quality. If only one quote is obtained after reasonable efforts to obtain more, the Department Director will consider whether a Sole Source justification exists and if not whether additional solicitation efforts would result in additional quotes.
• Large Purchases. Purchases of supplies or equipment where the amount is expected to equal or exceed $10,000, but not exceed the spending limit of the Executive Director, must be supported by at least three quotes and approved by the Executive Director. If only two or fewer price quotations are obtained after reasonable efforts, the Executive Director may proceed to award the contract.
• Formal Solicitations
Purchases of goods or services with an estimated total cost of more than $50,000 shall be made in accordance with the applicable procedures for competitive sealed solicitations, included but not limited to Invitations for Bids, Requests for Proposals, Requests for Qualifications, Requests for Information and any other formal solicitation method.

3.2 Energy Procurement. RCEA must secure sufficient power resources and energy attributes to serve its customers, comply with State law and meet RCEA’s goals. The Executive Director is authorized to enter into agreements in accordance with the RCEA Board-approved Energy Risk Management Policy. Procurement of and contracts for energy (sometimes referred to as Power Purchase Agreements or PPAs) or for energy related products shall be subject to the requirements, approvals, and signing authorities set out in the Energy Risk Management Policy.

3.3 Piggyback or Cooperative Purchasing4. Supplies, goods, information technology and services may be procured without convening a competitive procurement process if the supplier has been awarded contracts by the state or other local agencies for the purchase of such supplies or services under a competitive process. RCEA may contract directly with the vender without additional process if: 1) the prices paid are competitive with comparable products offered in the marketplace, 2) the original procurement was in compliance with the procurement requirements for the originally procuring entity, and 3) the conflict-of-interest provisions of this Policy are adhered to. 4 Public Contract Code §§ 10298 – 10299
38 Procurement Policy, 2024

Page 5 ends

3.4 Contracts for Certain Professional Services

3.4.1 Professional Services5. Professional services require extended analysis, the exercise of discretion, and independent judgment in the performance and/or application of an advanced, specialized type of knowledge, expertise, or training, which is customarily acquired either by a prolonged course of study or equivalent experience in the field. Examples include licensed professionals such as attorneys, accountants, design professionals, and real estate brokers, as well as non-licensed professionals such as software developers, financial, security professionals and other consultants. Such contracts may be awarded only on the basis of demonstrated competence and qualifications necessary for the type of services required, and at a fair and reasonable price.

3.4.1.1 Design and Engineering Professionals6. Architectural, design and engineering professionals must specifically be procured in a fair and competitive process that prohibits RCEA employees from participating in the selection process when the employee has a financial or business relationship with any private entity seeking the contract.

3.5 Single and Sole Source Purchases and Contracting.

Single and sole source procurement is generally not permitted except under circumstances specifically identified in this Policy. All single and sole source purchases must be justified in writing, with review and approval by the Executive Director when within the spending limits authorized for the Executive Director, and otherwise by the Governing Board of Directors.

3.5.1 Single Source Procurement Defined. There may be more than one possible source, yet there is a strong compelling reason to only use one specific vendor.

Examples of acceptable rationale for single sourcing could be agency standardization or vendor ability to meet time constraints. Repeat business with a vendor or contractor is not justification for a single source.

3.5.2 Sole Source Procurement Defined. Purchases are directed to one source because there is only one particular vendor able to fulfill the procurement need.

This may be based upon a lack of competition, copyright or proprietary issues, or a supplier’s unique capability.

3.6 Exempt Purchasing. The Board of Directors hereby provides that the following transactions are exempt from the above purchasing and procurement authority limits, provided that such expenditures are consistent with the budget adopted by the Board:

3.6.1 Utilities, where there is no reasonable basis for competitive procurement

3.6.2 Renewal policies for insurance benefits already approved.

3.7 Emergency Purchases7. In the case of an emergency, the Executive Director is authorized to take action to repair or replace a public facility, take any directly related and immediate action required by that emergency, and procure the necessary equipment, services and supplies for those purposes without giving notice for bids to 5 Government Code §§4525 et seq., 31000, 53060
6 Government Code §4529.10 et seq.
7 Public Contract Code §§1102, 22050
39 Procurement Policy, 2024

Page 6 ends

let contracts. The Executive Director may contact one or more suppliers by telephone or electronically, and, as expeditiously as possible, determine the best price and quality of product or services available from the supplier(s).

3.7.1 For purposes of this Policy, “emergency” means a sudden, unexpected occurrence that poses a clear and imminent danger, requiring immediate attention to prevent or mitigate the loss or impairment of life, health, property, or essential public services including the provision of energy or power to RCEA customers. Before taking action, the Executive Director shall make a finding, based on substantial evidence that the emergency will not permit a delay resulting from a competitive solicitation and that the action is necessary to respond to the emergency.

3.7.2 The Executive Director shall Report to the Board of the Directors at its next meeting the reasons why the emergency will not permit a delay resulting from a competitive solicitation for bids and why the action is necessary to respond to the emergency.

3.7.3 The meeting which the Executive Director shall report to the Board must be not later than seven days after the action, or at the Board of Director’s next regularly scheduled meeting if that meeting is not later than 14 days after the action.

Thereafter, the Executive Director shall report to the Board of Directors at least at every regularly scheduled meeting until the action is terminated.

3.7.4 The Board of Directors will review the Executive Director’s report and determine by four-fifths vote whether there is need to continue the action.

3.7.5 The Board of Directors shall terminate the action at the earliest possible date that conditions warrant so that the remainder of the emergency action may be completed by giving notice for bids to let contracts.

4.0 PUBLIC PROJECTS CONSTRUCTION CONTRACTS

4.1 Public Projects, Defined and Applicability8. A “public project” means a project for the erection, improvement, painting and repair of public buildings and works. The bidding procedures contained in this Policy must be used for all public projects.

4.1.1 Small Public Projects (less than $4,000)9. Public projects that are estimated to cost less than $4,000, exclusive of the costs of equipment, supplies, materials, plans, specifications and engineering, may be procured by informal procedures, as set forth below, including requests for quotes. Work may be done under purchase order without additional written contract.

4.1.2 Mid-Sized Public Projects ($4,000 - $10,000)10. Public projects that are estimated to cost between $4,000 and $10,000, exclusive of the costs of equipment, supplies, materials, plans, specifications and engineering, may be procured by 8 Public Contract Code §§20121, 20150.1
9 Public Contract Code §20121
10 Public Contract Code §20150.4
40 Procurement Policy, 2024

Page 7 ends

informal or formal bidding procedures, as set forth below. All work must be done under contract rather than by purchase order.

4.1.3 Large Public Projects ($10,000 and greater)11. Public projects estimated to cost $10,000 or more, exclusive of the costs of equipment, supplies, materials, plans, specifications and engineering, must be procured using formal bidding procedures. All work must be done under written contract rather than by purchase order.

4.2 Prevailing Wage12. Prevailing wage requirements will apply to, and prevailing wages must be paid on, any “public works” project with total cost in excess of $1,000. For purposes of prevailing wage requirements, “public works” means the “construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part out of public funds, including work done during preconstruction design, site assessment, tree removal, and feasibility study.”

4.3 Public Projects Bidding Procedures

4.3.1 Informal Bidding Procedures (Small and Mid-Sized Projects up to $10,000)13.

The following procedures must be followed when using an informal bidding process for small and mid-sized public projects:
• Registering Contractors. Prior to initiating an informal bidding process for a specific public project, RCEA must register contractors in Humboldt County by publishing notice of the opportunity to register with RCEA to be subsequently notified of informal public project bidding opportunities. The list of such contractors is a public record.
• Notice Inviting Bids14. Notice inviting bids for a specific small to mid-sized public project must be published at least one time in a newspaper of general circulation at least 24 hours prior to the time for opening bids. The Notice must describe the project in general terms and state the closing date for submission of bids. In RCEA’s discretion, the notice may also be published in any trade publication and/or mailed directly to the contractors registered with RCEA.

4.3.2 Formal Bidding Procedures (Large Public Projects $10,000 and Greater)

15. The
following procedures must be followed when using formal bidding process for public projects in excess of $10,000:
• Notice Inviting Bids. Notice inviting formal bids for a specific public project must be published at least 10 days before the date for opening bids, and must be published at least twice, not less than 5 days apart, in a newspaper of general circulation. The notice must describe the project in general terms 11 Public Contract Code §§ 20121, 20150.1
12 Labor Code §§1720, 1771
13 Public Contract Code §§20150.4 - 20150.7
14 Government Code §6061
15 Public Contract Code §§ 20121, 21024, 20125, 20128, 20129, 20150.8 41 Procurement Policy, 2024

Page 8 ends

and state the closing date for submission of bids. In RCEA’s discretion, the notice may also be published in any trade publication.
• Project Plan Adoption. The RCEA Board of Directors must adopt the plans, specifications and working details for all public projects expected to exceed $10,000.
• Contract Award. Contract awards shall be made by the Board of Directors to the lowest responsible bidder.

4.3.3 No Bid Splitting16. RCEA is committed to a program of purchasing competitively and wisely from responsible parties that are properly suited to the job intended, both as to price and quality. Purchase requisitions may not be artificially divided or split to circumvent any competitive bidding requirement. In addition, specifications may not be drafted in such a manner as to limit the bidding directly or indirectly to any one specific concern, or any specific brand, product, thing, or service. Certain items are approved as exempt from competitive bidding requirements or are approved as sole source purchases as provided for under this Policy.

5.0 ENVIRONMENTALLY PREFERABLE PURCHASING
RCEA’s goal is to reduce greenhouse gas emissions generated by its operations whenever practicable. In this endeavor, terms and conditions of all solicitations shall encourage, whenever possible, services and products that are proven to be beneficial to the environment. Except when otherwise prohibited, whenever RCEA acquires services and/or supplies by purchase or contract, the Purchasing Agent, in evaluating the price or bid of shall award a fifteen percent preference on the price submitted involving the following environmentally beneficial attributes:
• Recycled Content: recycled product includes all non-hazardous materials, goods, and supplies and must contain at least 50 percent by weight secondary and/or postconsumer material, with at least 10 percent being post-consumer recycled product shall include any product which could have been disposed of as solid waste at the completion of its life cycle as a consumer item, but which otherwise is refurbished for reuse without substantial alteration of its form.
• Greener Products and Services: products that meet the standards and have ecolabels/certifications in their respective category (e.g. Energy Star for electronics) per the Environmental Protection Agency (EPA)’s Recommendations of Specifications, Standards and Ecolabels.

6.0 HUMBOLDT COUNTY PREFERNCE
In recognition of the economic benefits provided by business located within RCEA’s jurisdiction, a local preference credit of 5%, for Humboldt County businesses shall be permitted when evaluating competitive solicitations for supplies, equipment, materials and services that are not part of a public project. A Humboldt County business is defined as 1) conducting business in an office with a physical location within the County of Humboldt; and 2) holding a valid business license issued by the County of Humboldt or any City within the County. The Purchase Agent’s determination regarding a business’ local preference credit shall be final.
16 Public Contract Code §§100, 20120 et seq., 20123.5
42 Procurement Policy, 2024

Page 9 ends

7.0 SURPLUS PROPERTY DISPOSAL17
The term surplus property shall mean any property other than real property that is no longer needed or useable by RCEA. Any item of surplus property of an estimated value of one thousand dollars ($1,000.00) or less may be declared surplus to RCEA needs by the Purchasing Agent. Any other item may be declared surplus by the Board of Directors.

7.1 Surplus Property Disposal Procedures. The Purchasing Agent is responsible for the disposition of all declared surplus property. The Purchasing Agent shall determine which of the following methods of disposition to use; the priority for disposition shall be in the order listed below:

7.1.1 Trade In. Surplus property may be offered as a trade-in for credit toward the acquisition of new property. All trade-in offers will be submitted for the review and approval of the Purchasing Agent.

7.1.2 Return to Manufacturer. Surplus property may, when possible, be returned to the manufacturer for buy-back or credit toward the purchase of new property.

7.1.3 Sale. Surplus property may be offered for sale. All surplus property is for sale “as-is” and “where-is” with no warranty, guarantee, or representation of any kind, expressed or implied, as to the condition, utility, or usability of the property offered for sale. Proceeds received from the sale of surplus property shall be paid into the RCEA treasury. Appropriate methods for sale are as follows:
• Public Auction: A public auction must convey surplus property to the highest bidder, for cash. A public auction sale or lease may be made at such place as the Board approves by vote. Notice of the sale or lease shall be given for five days prior thereto either by publication in a newspaper published in the county or by posting in three public places in the county. If the property does not exceed in value the sum of five hundred dollars ($500), or the monthly rental value thereof is less than seventy-five dollars ($75), it may be sold or leased at private sale without advertising authorized by a majority vote of the Board.
• Sealed Bids: Sealed bids may be solicited for the sale of surplus property.

Surplus property disposed of in this manner shall be sold to the highest responsive bidder.
• Selling for Scrap: Surplus property with a minimal fair market value may be sold as scrap.

7.1.4 Donation or Disposal. If RCEA is unable to sell surplus property after using the methods provided in sections above, or if the cost of locating a buyer exceeds the estimated sale price of surplus property, the property may be donated to another public agency, educational institution, or registered non-profit entity under 501(c)(3) upon written request and determination that it is in the public interest to do so.
17 Government Code §25363
43 This page
intentionally
left blank.
44 REDWOOD COAST ENERGY AUTHORITY

INVESTMENT POLICY

1.0 PURPOSE
The purpose of this Investment Policy is to provide objectives and guidelines to Redwood Coast Energy Authority (RCEA) officers and employees for the management of cash, deposits and investments (together, “funds”) at RCEA. This Policy covers all funds and investment activities under the direct authority of RCEA, as set forth in the California Government Code, Sections 53600 et seq.

2.0 OBJECTIVES
When managing funds, RCEA’s primary objectives, in order of importance, shall be to safeguard the principal of the funds, meet the liquidity needs of RCEA, and achieve a return on investment on funds in RCEA’s control.
• Safety. Safety of principal is the foremost objective of cash and investment management activities. The investment of funds shall be undertaken in a manner that seeks to ensure the preservation of principal.
• Liquidity. The funds shall remain sufficiently liquid to meet all operating needs that may be reasonably anticipated. Since all possible cash demands cannot be anticipated, the investment of funds in deposits or instruments available on demand is recommended. • Return on Investment. The deposit and investment portfolio shall be designed with the objective of attaining market rate of return throughout the economic cycle while considering risk and liquidity constraints. The return on deposits and investments is of secondary importance compared to the safety and liquidity objectives described above.

3.0 STANDARD OF CARE
RCEA will manage funds in accordance with the Prudent Investor Standard1.

4.0 DELEGATION OF AUTHORITY2
The responsibility to manage funds is delegated to the Treasurer of RCEA. The Treasurer may appoint Deputy Treasurers as the Treasurer deems necessary and convenient for the prompt and faithful discharge of its duties to invest and reinvest the funds of RCEA. 1 Government Code §53600.3.1: “Governing bodies of local agencies or persons authorized to make investment decisions on behalf of those local agencies investing public funds are trustees and therefore fiduciaries subject to the prudent investor standard. When investing, reinvesting, purchasing, acquiring, exchanging, selling or managing public funds, a trustee shall act with care, skill, prudence and diligence under the circumstances then prevailing, that a prudent person acting in a like capacity and familiarity with those matters would use in the conduct of funds of a like character and with like aims, to safeguard the principal and maintain the liquidity needs of the agency.

Within the limitations of this section and considering individual investments as part of an overall strategy, investments may be acquired as authorized by law.”
2 Government Code §53607
45 Investment Policy, 2024
RCEA may engage the services of one or more external investment advisers, who are registered under the Investment Advisers Act of 1940, to assist in the management of RCEA’s investment portfolio in a manner consistent with this Policy. External investment advisers may also be granted discretion to purchase and sell investment securities in accordance with this Policy. The Treasurer will review this Policy annually and any changes will be submitted to the RCEA Board of Directors for approval.

5.0 ETHICS AND CONFLICT OF INTEREST
All participants in the investment process shall act as custodians of the public trust. The investment portfolio is subject to public review and evaluation and thus all involved in the investment process shall refrain from personal business activity that could create a conflict of interest or the appearance of a conflict with proper execution of the investment program, or which could impair their ability to make impartial investment decisions.

Employees and investment officials shall disclose to RCEA’s General Counsel or designee any material interests in financial institutions with which they conduct business, and they shall further disclose any large personal financial/investment positions that could be related to the performance of the investment portfolio. Employees and officers shall refrain from undertaking any personal investment transactions with the same individual with whom business is conducted on behalf of RCEA. Employees and officers shall not accept honoraria, gifts, and gratuities from advisors, brokers, dealers, bankers, or other person with whom RCEA conducts business.

6.0 AUTHORIZED INVESTMENTS3
Within the investments permitted by code, RCEA seeks to further restrict eligible investments to the guidelines listed below. In the event a discrepancy is found between this Policy and code, the more restrictive parameters will take precedence. Percentage holding limits and minimum credit quality requirements listed in this section apply at the time the security is purchased.

6.1 Deposits at Bank(s)4. Funds may be invested in non-interest-bearing depository accounts to meet RCEA’s operating and collateral needs. Funds not needed for these purposes may be invested in interest bearing depository accounts or Federal Deposit Insurance Corporation (FDIC) insured certificates of deposit with maturities not to exceed five years. Banks must collateralize RCEA deposits beyond the FDIC insured amount. Banks eligible to receive deposits must be federally or state chartered and have a rating of not less than “satisfactory” in its most recent evaluation by the appropriate federal financial supervisory authority. The Treasurer will monitor the credit quality of eligible banks to ensure the safety of RCEA deposits. 3 Government Code §§53600 et seq.
4 Government Code §53635.2
46 Investment Policy, 2024

6.2 Money Market Funds5. Funds may be invested in money market funds that are registered with the Securities and Exchange Commission under the Investment Company Act of 1940.

6.3 Local Agency Investment Fund (LAIF)6. Funds may be invested in the Local Agency Investment Fund. The LAIF was established by the California State Treasurer for the benefit of local agencies.

6.4 California Joint Power Authority (JPA) Investment Pools7. Funds may be invested in JPAs, such as the California Cooperative Liquid Assets Securities System (CA CLASS), and CalTRUST, that offer pooled investment options.

6.5 US Treasury Obligations. Funds may be directly invested in United States Treasury obligations and other government obligations for which the full faith and credit of the United States are pledged for the payment of principal and interest with a term to maturity not exceeding five (5) years. There are not limits on the dollar amount or percentage that RCEA may invest in U.S. Treasuries.

6.6 Federal Agency Securities. Funds may be directly invested in Federal Agency Securities or United States Government-Sponsored Enterprise obligations, participations, or other instruments, including those issued by or fully guaranteed as to principal and interest by federal agencies or United States government-sponsored enterprises. There are no limits on the dollar amount or percentage that RCEA may invest in Federal Agency or Government-Sponsored Enterprises with a term to maturity not exceeding five (5) years. No more than 10% of the portfolio may be invested in any single Agency/Enterprise, and the maximum percent of Agency callable securities in the portfolio shall be 10%. Federal agency and GSE obligations must be rated in a rating category of AA or equivalent or better.

6.7 Municipal Securities Funds may be directly invested in municipal securities including obligations of RCEA, the State of California and any local agency within the State of California, provided that:
• The securities are rated in a minimum rating category of “A+” or its equivalent or better by at least one nationally recognized statistical rating organization. • No more than 5% of the portfolio may be invested in any single issuer. • No more than 20% of the portfolio may be in Municipal Securities. • The maximum maturity does not exceed five (5) years.
5 Government Code §53601(I)(2); §53601 (I)(4)
6 Government Code §§16429 et seq.
7 Government Code §6500
47 Investment Policy, 2024

7.0 MANAGEMENT OF INVESTMENTS

7.1 Prohibited Transactions.
8 RCEA shall not invest funds in any security that could result in a zero-interest accrual, or less, if held to maturity. The purchase of foreign currency denominated securities is prohibited. Trading securities for the sole purpose of speculating on the future direction of interest rates is prohibited. Purchasing or selling securities on margin is prohibited. The use of reverse re-purchase agreements, securities lending or any other form of borrowing or leverage is prohibited.

7.2 Portfolio Management. The term to maturity of any funds invested as measured from settlement date to maturity date shall not exceed five (5) years. The Treasurer will allocate funds among authorized investments consistent with the objectives and standards of care outlined in this Policy.

7.3 Due Diligence. Prior to the purchase of an investment the persons authorized to make the investments shall assess the market and market prices using information obtained from available sources including investment services, brokers/dealers, and the media.

7.4 Brokers. To the extent practicable, the Treasurer shall endeavor to complete investment transactions using a competitive bid process whenever possible. Selection of financial institutions and broker/dealers authorized to engage in transactions will be at the sole discretion of RCEA, except where RCEA utilizes an external investment adviser in which case RCEA may rely on the adviser for selection. Institutions eligible to transact investment business with RCEA include:
• Those licensed by the state as a broker-dealer.
• Members of a federally regulated securities exchange. • Primary government dealers as designated by the Federal Reserve Bank and non-primary government dealers. • Nationally or state-chartered banks.
• The Federal Reserve Bank.
• Direct issuers of securities eligible for purchase.

Selection of broker/dealers used by an external investment adviser retained by RCEA will be at the sole discretion of the adviser. Where possible, transactions with brokers/dealers shall be selected on a competitive basis and their bid or offering prices shall be recorded. If there is no other readily available competitive offering, best efforts shall be made to document quotations for comparable or alternative securities. When purchasing original issue instrumentality securities, no competitive offerings will be required as all dealers in the selling group offer those securities at the same original issue price.
8 Government Code §53601.6
48 Investment Policy, 2024
The Treasurer shall be prohibited from selecting any broker, brokerage firm, or securities firm that has, within any 48-month consecutive period following January 1, 1996, made a political contribution in an amount exceeding the limitations contained in Rule G-37 of the Municipal Securities Rulemaking Board to any member of the RCEA Board, or any candidate for those offices. The brokers/dealers shall be provided with an acknowledge receipt of this Policy.

7.5 Losses. Losses are acceptable on a sale before maturity and may be taken if required to meet the liquidity needs of RCEA or if the reinvestment proceeds will earn an income flow with a present value higher than the present value of the income flow that would have been generated by the original investment, considering any investment loss or foregoing interest on the original investment.

7.6 Delivery and Safekeeping. The delivery and safekeeping of all securities shall be made through a third-party custodian when practical and cost effective as determined by the Treasurer and in accordance with Section 53608. The Finance Manager shall review all transaction confirmations for conformity with the original transaction.

7.7 Risk Management and Diversification.

7.7.1 Credit Risk. Credit risk is the risk that a security or a portfolio will lose some or all its value due to a real or perceived change in the ability of the issuer to repay its debt. RCEA will mitigate credit risk by adopting the following strategies:
• The diversification requirements included in the “Authorized Investments” section of this policy are designed to mitigate credit risk in the portfolio. • No more than 5% of the total portfolio may be deposited with or invested in securities issued by any single issuer unless otherwise specified in this policy. • RCEA may elect to sell a security prior to its maturity and record a capital gain or loss in order to manage the quality, liquidity or yield of the portfolio in response to market conditions or RCEA’s risk preferences. • If a security owned by RCEA is downgraded to a level below the requirements of this policy, making the security ineligible for additional purchases, the following steps will be taken:
• Any actions taken related to the downgrade by the investment manager will be communicated to the Treasurer in a timely manner.
• If a decision is made to retain the security, the credit situation will be monitored and reported to the RCEA Board.

7.7.2 Market Risk. Market risk is the risk that the portfolio value will fluctuate due to changes in the general level of interest rates. RCEA recognizes that, over time, longer-term portfolios have the potential to achieve higher returns. On the other hand, longer-term portfolios have higher volatility of return. RCEA will mitigate market risk by providing adequate liquidity for short-term cash needs, and by making longer-term investments only with funds that are not needed for current cash flow purposes.
49 Investment Policy, 2024
RCEA further recognizes that certain types of securities, including variable rate securities, securities with principal paydowns prior to maturity, and securities with embedded options, will affect the market risk profile of the portfolio differently in different interest rate environments. RCEA, therefore, adopts the following strategies to control and mitigate its exposure to market risk:
• RCEA will maintain a minimum of $15 million in cash and overnight investments at all times to provide sufficient liquidity for expected disbursements.
• The maximum stated final maturity of individual securities in the portfolio will be five (5) years, except as otherwise stated in this policy. • The duration of the portfolio will generally be approximately equal to the duration (typically, plus or minus 20%) of a Market Benchmark, an index selected by RCEA based on RCEA’s investment objectives, constraints and risk tolerances.

8.0 AUDITS
RCEA’s funds shall be subject to a process of independent review by its external auditors.

RCEA’s external auditors shall review the investment portfolio in connection with the annual audit for compliance with the Investment Policy. The results of the audit shall be reported to the RCEA Board of Directors.

9.0 REPORTS

9.1 Monthly: The Treasurer will perform a monthly review of the investment function and shall submit a monthly report of all investment transactions to the Board of Directors.

Investment transactions are defined as the purchase, sale or exchange of securities.

9.2 Annually: The Treasurer will submit an annual report to the Board of Directors and Executive Director within 45 days of the end of a fiscal year providing the following:

9.2.1 A list identifying the type of investment, issuer, date of maturity, par and dollar amount invested on all securities, the market value and source of the market value information; A statement that the portfolio is in compliance with the Investment Policy and in accordance with Government Code Section 53646 or the manner in which the portfolio is not in compliance; and

9.2.2 A statement of RCEA’s ability to meet expenditure requirements for the upcoming 12 months.
50 1

REDWOOD COAST ENERGY AUTHORITY

FINANCIAL MANAGEMENT POLICY

1. Introduction
This policy been prepared to define the financial management duties and procedures of the Redwood Coast Energy Authority (RCEA). Their purpose is to ensure that finances are managed transparently, efficiently, and with responsible stewardship. All terms and conditions of other RCEA policies shall apply to this policy. All terms and conditions made pursuant to agreements with grantor agencies and contractors shall apply to this policy. This policy is intended to replace all previous financial management and accounting policies to the extent they are inconsistent.

2. Division of Duties
The following is a list of personnel who have responsibilities for the accuracy and integrity of RCEA’s financial management and reporting:

Board of Directors:
• Reviews financial reports.
• Reviews and approves warrants reports of financial transactions. • Reviews and approves the annual budget as well as interim adjustments. • Reviews and approves independent financial audits.
• Reviews and approves all contracts for goods and services that will exceed $250,000 during any fiscal year.
• Designates check signing and disbursement authority, including electronic funds disbursement. Such authority shall include the Board Chair and the Vice Chair.

Executive Director:
• Reviews and approves all financial reports for submission to the Board of Directors. • Has check signature authority as one of two required signatories. • Reviews and approves all contracts for goods and services $250,000 or less during any fiscal year.
• Reviews and approves internal accounting standards and operating procedures and any changes to those procedures.
• Has authority to initiate disbursements and transfer funds, per this policy.

Director of Business Planning and Finance:
• Serves as RCEA Treasurer.
• Approves reconciliations of bank accounts.
• Develops and maintains internal accounting standards and operating procedures to be approved by the Executive Director.
• Reviews and approves electronic funds transfers and submits them to the Executive Director for review and approval. The Executive Director’s approval may occur after the funds have been transferred.
• Has check signature authority as one of two required signatories. • Has authority to initiate disbursements and transfer funds, per this policy. 51 2
Deputy Executive Director:
• Reviews reconciliations of bank accounts.
• Reviews and approves electronic funds transfers with the Director of Business Planning and Finance. This may occur after funds have been transferred. • Has check signature authority as one of two required signatories. • Has authority to initiate disbursements and transfer funds, per this policy.

3. Spending Authority
The Executive Director is authorized to approve expenditures provided that:
• The expenditure complies with the above division of duties so that contracts reasonably expected to cost $250,000 or more in any fiscal year be approved by the Board of Directors. • The expenditure is consistent with all adopted RCEA policies, including but not limited to the Energy Risk Management Policy and Procurement Policy.
• The total cost of the expenditure will not result in exceeding the amount annually budgeted and approved in the applicable category by 5%.

All cash disbursements made by check shall be double-signed by authorized check signors as approved by the Board of Directors. Cash disbursements made by check in excess of $250,000 for the payment of expenditures not under a contract previously approved by the Board of Directors shall be signed by at least one Board Member who is also an authorized check signor.

All disbursements by electronic funds transfer via the Automated Clearing House (ACH) apparatus shall be approved by two authorized check signors. Such authorization may take the form of an electronic approval or electronic signature. The first approval shall occur prior to the transfer while the second approval may occur subsequent to the transfer. ACH cash disbursement in excess of $250,000 for the payment of expenditures not under a contract previously approved by the Board of Directors shall be signed by at least one Board Member who is also an authorized check signor

4. RCEA Treasurer
RCEA’s Amended and Restated Joint Powers Agreement establishes that the RCEA Board shall designate a qualified person to service as RCEA Treasurer. The agreement states that Treasurer shall have charge of depositing and maintaining custody of all funds held by the RCEA, and shall maintain strict accountability for all funds and reports of all receipts and disbursements. In addition, the Treasurer shall perform all other duties that may be imposed by applicable law (including Government Code Sections 6505 and 6505.5), RCEA’s Joint Powers Agreement, or any rules of the Board.

Through this Policy the Board designates the Director Business Planning and Finance to serve as RCEA Treasurer.

5. Independent Financial Audits
RCEA’s Joint Powers Agreement establishes that the RCEA Board shall designate an RCEA Auditor.

Through this policy the RCEA Board establishes that it will select a qualified person or entity to perform the function of independent auditor, and that the independent auditor will report directly to the RCEA 52 3
Board of Directors and will be selected by the board through a process determined by the Board.

The auditor will be responsible for conducting annual financial audits that will be performed according to generally accepted accounting standards and government auditing standards. Audited financial statements, including the auditor's opinion thereon, will be submitted and presented to the RCEA Board for their review and approval after the financial statements have been reviewed by the Director of Business Planning and Finance and the Executive Director.

The Auditor will complete annual audits in a timely fashion and by no later than 10 months after the end of the applicable fiscal year. It is the responsibility of the Director of Business Planning and Finance, as well as all other RCEA staff, to provide any necessary information to the auditor so that audits can be completed in a timely fashion.

6. Budgeting
RCEA’s fiscal year is July 1 to June 30; prior to June 30 of each year the Executive Director will submit to the Board of Directors a proposed operating budget for the fiscal year commencing the following July

1. The operating budget includes proposed expenditures and the means of financing them.

Unless otherwise directed by the Board, the Executive Director will present a preliminary draft budget to the Board of Directors and the public at the regularly scheduled May Board of Directors meeting. The final proposed budget will be presented to the Board at its regularly scheduled June business meeting.

The Board may choose to hold additional public hearings or study sessions prior to the June business meeting as it sees fit.

During the course of the year the Board may elect to adopt revisions to the annual budget as needed.

The annual budget and any subsequent revisions the Board elects to make will be approved by motion of the Board.

7. Financial Reporting
Staff will provide the RCEA Board with regular financial reports, including disbursements, monthly profit and loss statements, balance sheets, and year-to-date budget versus actual reports. The Board of Directors may request other reports as it sees fit. The Director of Business Planning and Finance will prepare present these reports monthly for review and approval or acceptance by the Board at their monthly meeting and made available to the public through RCEA’s website as well as in hard copy at RCEA’s main business office.

8. Accounting and Financial Operating Procedures
Consistent with this and other RCEA policies, generally accepted accounting standards, and any applicable laws the Director of Business Planning and Finance will develop and maintain internal accounting operating procedures and standards to guide day-to-day financial operations. These operating procedures, and any subsequent updates or revisions to them, will be approved by the Executive Director and presented to the board, and also made available for public review on RCEA’s website as well as in hard copy at RCEA’s main business office. 53 4

9. Wholesale Power Procurement
To ensure successful operation of the community choice energy (CCE) program, RCEA has contracted an experienced Power Manager who will be executing on RCEA’s behalf the preponderance of power transactions as government by RCEA’s Board-adopted Energy Risk Management Policy and RCEA’s contract with the Power Manager. Power procurement not included in the authorized transaction types listed in the ERMP, or wholesale power transactions that fall outside of the delegations outlined in the ERMP will be purchased under this policy (e.g. local renewable energy purchase agreements, or transactions exceeding the approved limits).

10. Operating Reserves
During the first 12 months of CCE operations, RCEA will deposit funds in a reserve account such that at least $5 million is in the account at the end of the first 12 months, and maintain such amount thereafter. The reserve requirement shall be funded from program revenue available after fully funding the aggregate of operating expenses in RCEA’s approved budget. After the first 12 months of power procurement, the reserve account will continue to serve as credit support for RCEA power transactions through its contracted Power Manager. The amount in the fund shall be equal or greater than the credit exposure as calculated by the Power Manger on an annual basis.

In the first 12 months of CCE operations RCEA will also establish a minimum operating balance of $1 million in RCEA’s CCE operating account.

In addition to the minimum reserve requirement, the RCEA Board may set additional reserve targets or requirements as it deems appropriate.

11. Bad Debt or Uncollectable Accounts
RCEA shall include in its annual budget a reserve for bad debt or uncollectable accounts. This budgetary reserve will be calculated by the Director of Business Planning and Finance in coordination with RCEA’s contracted Power Manager. On an annual basis, if actual collections experience so indicates, the bad debt reserve shall be modified appropriately. 54

Page 1 of 2 ends

STAFF REPORT
Agenda Item # 4.6
AGENDA DATE: September 26, 2024
TO: Board of Directors
PREPARED BY: Jocelyn Gwynn, Senior Power Resources Manager SUBJECT: UC Resource Adequacy Agreement Amendment

BACKGROUND
In 2020, the Board approved a 10-year Resource Adequacy (RA) Agreement with the University of California Regents (UC) for resale of a small portion of Sandrini Sol 1’s RA capacity. The agreement helped UC achieve compliance with the California Public Utilities Commission’s (CPUC) first procurement mandate under Decision 19-11-016.

Since then, Sandrini has faced numerous delays, the CPUC has adopted a new RA framework, and RCEA and the project developer have executed a contract for co-located energy storage at the Sandrini site. All these developments warrant an amendment to the RA Agreement between RCEA and UC.

SUMMARY
Staff asks the Board to approve an amendment that would make the following substantive changes to the UC RA Agreement.
• Names a second unit from which RCEA will supply RA, the Sandrini Battery Energy Storage System. The storage facility is expected to begin operation approximately one year after Sandrini solar begins operation, at which point the RA will switch from the solar to the storage.
• Incorporates relevant changes to maintain a commensurate contract amount under the new Slice of Day (SOD) RA framework. Under SOD, different technology types receive different RA value, which means the agreement needs different methods to quantify contract amounts when RA is supplied from the solar facility versus the storage facility.

Under the original agreement, the contract amount is 0.6 MW. Under the amendment, the contract amount would be 2.2% of the total RA capacity from the solar facility. The contract amount reverts to 0.6 MW from the storage facility once it is online. • Updates the commercial operation date (COD) milestone and retains the initial COD for compliance purposes.
55

Page 2 of 2 ends

ALIGNMENT WITH RCEA’S STRATEGIC PLAN
Not applicable, this is a contract for grid reliability compliance.

EQUITY IMPACTS
Not applicable, this is a contract for grid reliability compliance.

FINANCIAL IMPACT
Relative to the original contract, staff expect some marginal savings under this amendment in the first contract year while the RA is supplied to UC from Sandrini solar. This is due to the change in how the contract amount is quantified and because solar is now worth less in terms of RA than when the contract was executed. The exact amount of savings is uncertain since we do not know exactly how much RA Sandrini solar will be able to deliver. However, once Sandrini storage is operational and for the remaining nine years of the delivery term, no financial impacts are expected relative to the original contract, because the battery storage will provide the same amount of RA each month.

STAFF RECOMMENDATION
Approve Resolution 2024-12 Approving the Form of and Authorizing the Execution of the First Amendment to the Resource Adequacy Agreement with the Regents of the University of California.

ATTACHMENTS
Resolution 2024-12
First Amendment to the RCEA-UC Resource Adequacy Agreement 56 1
RESOLUTION NO. 2024-12

A RESOLUTION OF THE BOARD OF DIRECTORS

OF THE REDWOOD COAST ENERGY AUTHORITY

APPROVING THE FORM OF AND AUTHORIZING THE EXECUTION

OF THE FIRST AMENDMENT TO THE RESOURCE ADEQUACY AGREEMENT

WITH THE REGENTS OF THE UNIVERSITY OF CALIFORNIA
WHEREAS, Redwood Coast Energy Authority (“RCEA”) entered into a Resource Adequacy (“RA”) Agreement with The Regents of the University of California (“UC”) on October 16, 2020 ("Agreement"), to assist UC with a capacity procurement compliance obligation; and WHEREAS, the California Public Utilities Commission has enacted substantive changes to the RA compliance program; and

WHEREAS, RCEA and the upstream developer have enacted substantive changes to the project from which RCEA is supplying the RA product to UC under the Agreement; and WHEREAS, the Parties desire to amend the Agreement as set forth in the amendment provided as Exhibit A (“Amendment”).

NOW, THEREFORE, the Board of Directors of the Redwood Coast Energy Authority resolves as follows:

1. The First Amendment to the Resource Adequacy Agreement between Redwood Coast Energy Authority and The Regents of the University of California is hereby approved.

2. The Executive Director of Redwood Coast Energy Authority is authorized to execute the Amendment substantially in the form attached hereto as Exhibit A on behalf of RCEA, and, in consultation with legal counsel, is authorized to approve any needed future amendment to the Agreement so long as the term, volume, and price are not changed and the amendment does not fundamentally change the business terms of the Agreement or measurably increase risk exposure for RCEA.

Adopted this 26th day of September 2024.

ATTEST:

Sarah Schaefer, RCEA Board Chair Lori Taketa, Clerk of the Board Date: _________________________ Date: ________________________ 57 2

CLERK'S CERTIFICATE
I hereby certify that the foregoing is a true and correct copy of Resolution 2024-12 passed and adopted at a regular meeting of the Redwood Coast Energy Authority, County of Humboldt, State of California, held on the 26th day of September 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTENTIONS:

Clerk of the Board, Redwood Coast Energy Authority
58 3
Exhibit A: First Amendment to Resource Adequacy Agreement with The Regents of the University of California
59 FIRST AMENDMENT TO

RESOURCE ADEQUACY AGREEMENT
This FIRST AMENDMENT TO RESOURCE ADEQUACY AGREEMENT (this "Amendment"), is entered into as of ____ _, 2024 (the "Effective Date") by and between Redwood Coast Energy Authority, a California joint powers authority ("Seller" or "RCEA") and The Regents of the University of California ("Buyer"), each individually a "Party'' and collectively, the "Parties".

RECITALS
WHEREAS, Buyer and Seller entered into that ce1tain Resource Adequacy Agreement, dated October 16, 2020 (the "Agreement");
WHEREAS, the Pa1ties desire to amend the Agreement as set fo1th herein; and WHEREAS, the Pa11ies are ente1ing into this Amendment in accordance with Section 17.8 of the Agreement to implement such amendments.

AGREEMENT
NOW THEREFORE, in consideration of the mutual promises set fo11h below, and other good and valuable consideration, the receipt and sufficiency of which ar·e hereby acknowledged, the Pa1ties hereby agree as follows:
l. Amendments to the Agreement.
a. Section A of the Cover Sheet (Unit Info1mation) is hereby deleted in its entirety and replaced with the following:

Unit 1:

Unit Name: \ EDPR CA Solar· Par·k II LLC
Location: Kem Countv, CA
CAISO Resource ID: To be assigned by CAISO
Unit SCID: To be assigned by CAISO
UnitNQC: To be assigned by CAISO
(27 MW August NQC under CY
2021 Solar ELCC Factors)
UnitEFC: NIA
Resource Tvve: Solar
Path 26 (No11h or South): No11h
Local Capacity Area (if any, as of NIA Effective Date):

Deliverability restdctions, if any, as
described in most recent CAISO None
deliverabilitv assessment:

Run Hour Restiictions: NIA
Unit 2:

I Unit Name: I Sanddni BESS Storage LLC
1 60
Location: Kem Countv, CA
CAISO Resource ID: To be assimed bv CAISO
Unit SCID: To be assimed bv CAISO
UnitNQC: To be assigned by CAISO
(92 MW August NOC exoected)
Unit EFC NIA
Resource Type: Batte1y Storage
Path 26 (No1th or South): No1th
Local Capacity Area (if any, as of NIA
Effective Date):

Deliverability restiictions, if any, as None .
described in most recent CAISO '
deliverabilitv assessment:

Run Hour Restiictions: NIA \
b. Section D of the Cover Sheet (Contract Quantities) is hereby deleted in its entirety and replaced with the following:

For the period of time from Initial Delivery Date through the occurrence of all of the following (a) the Commercial Operation Date of Unit 2 has occurred, and (b) the CAISO has determined that the deliverability status has been transferred from Unit 1 to Unit 2, and (c) Unit 2 is available to be included in a Supply Plan for Buyer, the Contract Quantity shall be delivered from Unit 1 and shall equal:

Contract Quantity: Two point two percent (2.2%) of the RA Capacity made available to Seller for each hour of each Showing Month by Developer for Unit 1.

RA Atti·ibutes: Two point two percent (2.2%) of the NQC made available to Seller for each hour of each Showing Month by Developer for Unit 1.

Local RA Atti·ibutes: NIA
Flexible RA Atti·ibutes: NIA
For the period of time following the occurrence of all of the following (a) the Commercial Operation Date of Unit 2 has occurred, and (b) the CAISO has determined that the deliverability status has been transferred.from Unit 1 to Unit 2, and (c) Unit 2 is available to be included in a Supply Plan for Buyer, the Contract Quantity shall be delivered from Unit 2 and shall equal:

Contract Quantity: 0.60 MW of RA Atti·ibutes, as set forth below RA Atti·ibutes: 0.60 MW NQC (for a storage unit with four ( 4) hours of continuous discharge, meaning 0.60 MW NQC will be available for Buyer to show for a maximum of four ( 4) hours on its Resource Adequacy Plan)
Local RA Atti·ibutes: NIA
Flexible RA Atti·ibutes: NIA
c. Section G of the Cover Sheet (Milestones) is hereby deleted in its entirety and replaced with the following:
2 61
Milestone Date for Completion
Evidence of Site control for Unit 1 Complete
Evidence of Site control for Unit 2 Complete
Executed Interconnection Agreement Complete
Expected Constrnction Strut Date for Unit 1 Complete
Expected Const.met.ion Strut Date for Unit 2 May 1, 2025 O1iginal Expected Commercial Operation Date December 31, 2022 for Unit 1 Expected Commercial Operation Date for Unit 1 November 1, 2024 ~ Expected Commercial Operation Date for Unit 2 December 31, 2025 d. Section I of the Cover Sheet (Notices) is hereby deleted in its entirety and replaced with the following:

Buyer Notices
Delivery Address:
1111 Franklin Street
Oakland, CA 94607
Mail Address:

Attn: Cynthia Clark
Title: Clean Power Program Director
Phone:

Email:

DUNS: 00-398-5512
Federal Tax ID Number: 94-3067788
Invoices & Payments:

Attn: Matthew Kozuch
Phone:

Email:

Scheduling:

Attn: Jaclyn Han
Account Director - California
Phone 1:

Email:

Wire Transfer:

BNK: Bank of America
ACHRoutingNo.:-
and
3 Seller Notices
Delivery Address:
633 3rd St
Eureka, CA 95501
Mail Address:

Attn: Richard Engel
Title: Director of Power Resources
Phone:

Email:

With cc t
and
DUNS:-
Federal Tax ID Number:_
Invoices & Payments:

Attn: Accounting
Phone:~
Email:-
Scheduling:

Attn: The Energy Authority designated as
Buyer's SC
Day Ahead Desk Phone:

Real Time Desk Phone:

Email:

Wire Transfer:

BNK: Umpqua Bank
ABA:-
62 WIRERoutingNo.:-
ACCT:-
Credit and Collections:

Attn: Cynthia Clark
Clean Power Pro ·am Director
Phone:

Email: and
Notices of an Event of Default to:

Attn: Cynthia Clark
Clean Power Pro ·am Director
Phone:

Email:

With additional Notices of an Event of Default
to:

Attn: Nick Edwards, UC Legal
Phone:

Email:

ACCT:-
Credit and Collections:

Attn: Lori Biondini
Director of Business Planning and Finance
Phone:

Email:

Notices of an Event of Default to:

Attn: Lori Biondini
Director of Business Planning and Finance
Phone:

Email:

With additional Notices of an Event of
Default to:

Nancy Diamond, RCEA General Counsel
Phone:

Email:
e. Section 1.15 is hereby deleted in its entirety and replaced with the following:
"Commercially Operable" with respect to the Project, is a condition occuning after such time as the Developer has confumed in w1iting to Seller that Unit I or Unit 2, as applicable, has achieved commercial operation.
f. Section 1.3 1 is hereby deleted in its entirety and replaced with the following:
"Developer" means, as applicable, (a) EDPR CA Solar Park II LLC, a Delaware Limited Liability Company, with respect to Unit 1, and/or (b) Sandiini BESS Storage LLC, a Delaware limited liability company, with respect to Unit 2. g. Section 1.57 is hereby deleted in its entirety and replaced with the following:
"Interconnection Agreement" means the interconnection agreement entered into by Developer pursuant to which the Project and the Interconnection Facilities for Unit 1 and Unit 2 will be interconnected with the Transmission System during the Delive1y Te1m. h. Section 1.58 is hereby deleted in its entirety and replaced with the following:
"Interconnection Facilities" means the interconnection facilities, control and protective devices and metering facilities required to connect Unit 1 and Unit 2 with the Transmission System in accordance with the Interconnection Agreement. i. Section 1.85 is hereby deleted in its entirety and replaced with the following:
4 63
"Project" means the co-located units described in Section A of the Cover Sheet and in Exhibit D. The Project includes two units: (a) a 100 MW solar photovoltaic generating unit that is that is being developed by EDPR CA Solar Park II LLC, a Delaware Limited Liability Company (Unit 1) and (b) a co-located 92 MW / 368 MWh lithium-ion energy storage facility being developed by Sanchini BESS Storage LLC, a Delaware limited liability company (Unit 2).

J. Section 1.117 is hereby deleted in its entirety and replaced with the following:
"Unit" or "Units" shall mean, as applicable, Unit 1 and/or Unit 2, as described in Section A of the Cover Sheet and Exhibit D hereof (including any Replacement Units), from which RA Capacity is provided by Seller to Buyer. A Unit or Replacement Unit may not include a coal-fired or nuclear generating resource. As used herein, Unit shall refer to the unit from which the Contract Quantity is to be delivered in accordance with Section D of the Cover Sheet.
k. Sections 2.3(a)-(c) are hereby deleted in their entirety and replaced with the following:
(a) Seller shall have caused Unit 1 to become Commercially Operable. (b) Seller shall have secured all CAI SO and Governmental Approvals as are necessa1y for the safe and lawful operation and maintenance of Unit 1 and to enable Seller to deliver the Product to Buyer, including at the Contract Quantity. (c) Seller or Seller's agent shall have constructed or caused to be constrncted Unit 1 as of the Initial Delive1y Date in accordance with this Agreement to enable Seller to satisfy the obligations of the Seller herein, including the provision of the Product from Unit 1.

1. Section 3.3 is hereby deleted in its entirety and replaced with the following:
[Rese1ved]
m. Section 3.S(d) is hereby deleted in its entirety.
n. Section 10.3(m) is hereby deleted in its entirety and replaced with the following:

The Project as constrncted, operated, and maintained by Developer conesponds with the Desc1iption of Project provided in Exhibit D ofthis agreement and the Storage Operational Characteristics described in Exhibit E of this agreement. o. In Alticle 11 (Confidentiality),"§ 6250" is replaced with "§ 7920, as may be modified, amended, supplemented or updated from time to time" .
p. Section 16.1 is hereby deleted in its entirety and replaced with the following:

Progress Repo1ts. Seller shall timely provide Buyer notice of material events that may cause delays in the achievement of the COD by Developer. Seller shall timely provide to Buyer project development info1mation and documentation necessa1y to comply with relevant repo1ting requirements of any Governmental Body or Governmental Authority. q. Section 16.2(a) is hereby deleted in its entirety and replaced with the following:
5 64
Commercial Operation Date. "Commercial Operation Date" means the date on which Unit 1 or Unit 2, as applicable, became Commercially Operable, as stated by Seller in the written notice provided to Buyer substantially in the fo1m of Exhibit C (the "COD Ce11ificate"), subject to Buyer's acknowledgement to Seller in w1iting that Buyer agrees that the Commercial Operation Date with respect to Unit 1 or Unit 2, as applicable, has been achieved.
r. Section 16.2(b) is hereby deleted in its entirety and replaced with the following:

Te1mination for Failure to Achieve Commercial Operation. If Unit 1 has not achieved the Commercial Operation Date on or before the Initial Delive1y Date Deadline despite commercially reasonable eff 011s by Seller, then Buyer may te1minate this Agreement upon thirty (30) days' written notice without any fmt her obligation to the other Pa1ty. In addition, if the contract for the constrnction of either Unit 1 or Unit 2 with the applicable Developer is te1minated and not replaced, then Seller may te1minate this Agreement on thilty (30) days' written notice without any fmt her obligation to Buyer. For avoidance of doubt, if either Paity te1minates the Agreement pursuant to this section 16.2( c ), such te1mination shall not constitute an Event of Default and the te1minating Paity shall not, on the basis of such te1mination, owe the other Paity any damages or any Te1mination Payment.
s. Exhibit C is hereby deleted in its entirety and replaced with Exhibit C attached to this Amendment.
t. Exhibit D is hereby deleted in its entirety and replaced with Exhibit D attached to this Amendment.
u. Exhibit E is hereby deleted in its entirety and replaced with Exhibit E attached to this Amendment.
v. Exhibit F is hereby deleted in its entirety and replaced with Exhibit F attached to this Amendment.

2. General.
a. Definitions: Interpretation. All capitalized te1ms used in this Amendment (including the recitals hereof) and not othe1wise defined herein shall have the meanings assigned to them in the Agreement.
b. Agreement Othe1wise Not Affected. Except for the amendments pursuant hereto, the Agreement remains unchanged and in full force and effect and is hereby ratified and confumed in all respects. The execution and delive1y of, or acceptance of, this Amendment and any other documents and instiuments in connection herewith by either Pa1ty shall not be deemed to create a course of dealing or othe1wise create any express or implied duty by it to provide any other or further amendments, consents, or waivers in the future. c. Entire Agreement. This Amendment constitutes the entfre agreement and understanding of the Parties with respect to its subject matter and supersedes all oral communication or prior w1itings related thereto.
6 65
d. Binding Effect. This Amendment shall be binding upon, inure to the benefit of and be enforceable by the Parties hereto and their respective successors and assigns. e. No Reliance. Each Party hereby acknowledges and confiims that it is executing this Amendment on the basis of its own investigation and for its own reasons without reliance upon any agreement, representation, understanding or communication by or with the other Party or its agents, representatives or attorneys not set forth within the Agreement or this Amendment.
f. Costs and Expenses. Each Pa1ty shall be responsible for any costs and expenses incuned by such Paity in connection with the negotiation, prepai·ation, execution and delive1y of this Amendment and any other documents to be delivered in connection herewith. g. Governing Law. THIS AMENDMENT SHALL BE GOVERNED BY, CONSTRUED,

AND ENFORCED UNDER THE LAWS OF THE STATE OF CALIFORNIA WITHOUT

GIVING EFFECT TO ITS CONFLICTS OF LAW PRINCIPLES THAT WOULD REQUIRE THE APPLICATION OF THE LAWS OF ANOTHER STATE.
h. Amendments. This Amendment may not be modified, amended or otherwise altered except by w1itten instrument executed by the Paities' duly authorized representatives. i. Interpretation. This Amendment is the result of negotiations between and has been reviewed by counsel to each of the Pa1ties and is the product of all Paities hereto.

Accordingly, this Amendment shall not be constmed against either Pa1ty merely because of such Paity' s involvement in the preparation hereof.

J. Counterpaits. This Amendment may be executed and delivered in counterpaits, all of which taken together shall constitute one and the same ins1l11ment. Delive1y of an executed signature page of this Amendment by electronic mail tr·ansmission (including PDF) shall be the same as delive1y of a maimally executed signature page. [Signature Page Follows]
IN WITNESS WHEREOF, the Pa1ties hereto have caused this Amendment to be duly executed as of the Effective Date.
7 66

THE REGENTS OF THE UNIVERSITY OF

CALIFORNIA
Sign:

P1int:

Title:

Date:
8 REDWOOD COAST ENERGY AUTHORITY,
a California joint powers authodty
Sign:

P1int:

Title:

Date:
67 EXHIBIT C: FORM OF COMMERCIAL OPERATION DATE CERTIFICATE This ce1tification ("Ce1tification") of Commercial Operation is delivered by [Seller], a California joint powers authority ("Seller") to [Buyer] ("Buyer") in accordance with the te1ms of that Agreement dated [date] ("Agreement") by and between Seller and Buyer. All capitalized te1ms used in this Ce1tification but not otherwise defined herein shall have the respective meanings assigned to such te1ms in the Agreement.

As of ___ [DATE] __ , Seller hereby ce1tifies and represents to Buyer the following:
a) [Unit l] [Unit 2] is fully operational, reliable and interconnected, fully integrated and synchronized with the Transmission System.
b) The applicable Developer has installed equipment for [Unit l ] [Unit 2] with a nameplate capacity of no less than ninety-five percent (95%) of the contract capacity expected for such unit. c) [Unit 2 is fully capable of charging, storing and discharging energy up to no less than ninety-five percent (95%) of the contract capacity expected for such unit and receiving instmctions to charge, store and discharge energy, all within the operational constraints and subject to the applicable Storage Operational Characte1istics.]
d) Autho1ization to parallel [Unit l] [Unit 2] was obtained by the Pa1ticipating Transmission Owner, [Name of Pruticipating Transmission Owner as appropriate] on [DATE] SELLER or SELLER'S AGENT:

Signature: _______________ _
Name: _____________ _
Title:
------------------
Date:
------------------

ENGINEER
Signature: _______________ _
Name:
-----------------
Title:
------------------
Date:
------------------
9 68
EXHIBIT D: DESCRIPTION OF PROJECT
The following describes the Project to be constrncted, operated and maintained through the Te1m in accordance with the Agreement.

Unit 1 name: EDPR CA Solar Park II LLC
Resource type: Solar PV
Nameplate capacity: 100 MW
Location: Kem County, CA
For Unit 1:

CAISO transmission access charge area: PG&E
Point of interconnection: Wheeler Ridge 70kV
Existing zone: NP-15
PNode: TBD
CAISO Resource ID: TBD
Substation: Wheeler Ridge
Unit 2 name: Sandrini BESS Storage LLC
Resource type: Batte1y Storage
Nameplate capacity: 92 MW
Location: Kem County, CA
For Unit 2:

CAISO transmission access charge area: PG&E
Point of interconnection: Wheeler Ridge 70kV
Existing zone: NP-15
PNode: TBD
CAISO Resource ID: TBD
Substation: Wheeler Ridge
69 EXHIBIT E: STORAGE OPERATIONAL CHARACTERISTICS
Unit 2 Pmax = TBD
Unit 2 roundt:rip efficiency =1%
Unit 2 discharge duration = four ( 4) hours of continuous discharge Unit 2 maximum cycles per day =I
Unit 2 maximum cycles per ■
Unit 2 pairing = co-located with Unit 1
Unit 2 gii d charging capability = yes
Unit 2 interconnection capacity limit MW
11 70
EXHIBIT F: [RESERVED]
12 71
This page
intentionally
left blank.
72

Page 1 of 2 ends

Staff report revised 9/25/24 to correct
clerical error.

STAFF REPORT
Agenda Item # 4.7
AGENDA DATE: September 26, 2024
TO: Board of Directors
PREPARED BY: Jocelyn Gwynn, Senior Power Resources Manager SUBJECT: North Coast Highway Solar Feed-In Tariff PPA Amendments

BACKGROUND
In Q2 2020, the Board approved Power Purchase Agreements (PPA) with the North Coast Highway Solar (NCHS) 1 and 2 Feed-In Tariff (FIT) projects, being developed in Hydesville. The projects were originally contracted with a commercial operation date (COD) of November 2021 but have experienced a number of delays including change in ownership of the projects, permitting, site control and access, and interconnection issues. Due to some of these delays, staff allowed a 12-month extension of the NCHS CODs without penalties, pursuant to the FIT PPA terms.

In August 2021, the Board approved a revision to the FIT Program, including all executed contracts, reducing the daily delay damages rate from $0.20 per kilowatt of contracted capacity per day to $0.10/kW/day, to make the program less punitive on delays. The developer of the NCHS projects, EDP Renewables (EDPR), has been diligently paying these delay damages since missing their extended COD, while continuing to advance development of the local project in spite of significant challenges. The current expected COD for the projects is October 2025.

SUMMARY
Staff asks the Board to approve an amendment that would reduce the daily delay damages rate as the project achieves certain milestones. The developer is currently choosing to pay delay damages and continue to develop the project in good faith instead of terminating the PPAs.

However, they have reported to staff that the project is at risk of failure at the current damages rate, as the project’s COD continues to be pushed out due to delays outside the developer’s control. Staff believe that a reduction in the delay damage rate is necessary to ensure the project’s success, which is an important part of RCEA’s local development goals. Additionally, the amount of delay damages being collected from the projects is nominal with respect to RCEA’s budget and financial wellbeing, given the small project size.

The following is the revised daily delay damages rate schedule in the proposed amendments:
1) The rate will reduce to $0.075/kW/day upon completion of the PG&E pole restudy. 2) The rate will reduce to $0.05/kW/day upon approval of the conditional use permit. 3) The rate will reduce to $0.025/kW/day upon commencement of construction. 73

Page 2 of 2 ends

ALIGNMENT WITH RCEA’S STRATEGIC PLAN
The FIT program and projects advance many of the agency’s strategic goals, a subset of which are:
• 4.1.1 Maximize the Use of Local Renewable Energy to the Extent Technically and Economically Feasible and Prudent.
• 4.1.7.3 Provide Feed-In-Tariff Power Procurement Program for Small Generators. • 4.1.8.2 Procure Local Solar Energy.

EQUITY IMPACTS
N/A, these are amendments to existing contracts.

FINANCIAL IMPACT
Assuming the project achieves COD in October 2025, these amendments would result in approximately $50,000 less in liquidated damages collected from the developer than if the PPAs were not amended. However, as discussed above, it is more likely the developer would elect to terminate the contracts and cease project development rather than continuing to pay damages at the current rate.

STAFF RECOMMENDATION
Approve Resolution 2024-13 Approving the Form of and Authorizing the Execution of the Second Amendment to the North Coast Highway Solar 1 Power Purchase Agreement and the Second Amendment to the North Coast Highway Solar 2 Power Purchase Agreement.

ATTACHMENTS
Resolution 2024-13
Second Amendment to the North Coast Highway Solar 1 PPA Second Amendment to the North Coast Highway Solar 2 PPA 74 1
RESOLUTION NO. 2024-13

A RESOLUTION OF THE BOARD OF DIRECTORS

OF THE REDWOOD COAST ENERGY AUTHORITY

APPROVING THE FORM OF AND AUTHORIZING THE EXECUTION
OF THE SECOND AMENDMENT TO THE NORTH COAST HIGHWAY SOLAR 1 POWER

PURCHASE AGREEMENT AND THE SECOND AMENDMENT TO THE NORTH COAST HIGHWAY SOLAR 2 POWER PURCHASE AGREEMENT
WHEREAS, Redwood Coast Energy Authority (“RCEA”) entered into separate contracts with North Coast Highway Solar 1 LLC (“NCHS1”) and North Coast Highway Solar 2 LLC (“NCHS2”), both effective June 25, 2020 and amended on March 28, 2022 (collectively "Agreements"), pursuant to RCEA’s Feed-In Tariff Program and local power procurement goals; and
WHEREAS, NCHS1 and NCHS2 have experienced development delays beyond their control resulting in an inability to achieve project milestones by the corresponding agreed upon target dates; and
WHEREAS, consistent with the Parties’ respective goals for achieving successful project completion, the Parties desire to amend the Agreements as set forth in the amendments provided as Exhibit A and B (collectively “Amendments”); and
NOW, THEREFORE, the Board of Directors of the Redwood Coast Energy Authority resolves as follows:

1. The Second Amendment to the North Coast Highway Solar 1 Power Purchase Agreement between Redwood Coast Energy Authority and NCHS1 LLC is hereby approved.

2. The Second Amendment to the North Coast Highway Solar 2 Power Purchase Agreement between Redwood Coast Energy Authority and NCHS2 LLC is hereby approved.

3. The Executive Director of Redwood Coast Energy Authority is authorized to execute the Amendments substantially in the form attached hereto as Exhibit A and Exhibit B on behalf of RCEA, and, in consultation with legal counsel, is authorized to approve any needed future amendment to the Agreements so long as the term, volume, and price are not changed and the amendment does not fundamentally change the business terms of the Agreements or measurably increase risk exposure for RCEA.

Adopted this 26th day of September 2024.

ATTEST:

Sarah Schaefer, RCEA Board Chair Lori Taketa, Clerk of the Board Date: _________________________ Date: ________________________ 75 2

CLERK'S CERTIFICATE
I hereby certify that the foregoing is a true and correct copy of Resolution 2024-13 passed and adopted at a regular meeting of the Redwood Coast Energy Authority, County of Humboldt, State of California, held on the 26th day of September 2024, by the following vote:

AYES:

NOES:

ABSENT:

ABSTENTIONS:

Clerk of the Board, Redwood Coast Energy Authority
76 3
Exhibit A: Second Amendment to North Coast Highway Solar 1 Power Purchase Agreement
77 AMENDMENT No. 2 To PPA, NCHS 1 Page 1 of 3
AMENDMENT No. 2 TO

POWER PURCHASE AGREEMENT
(Feed-In Tariff, NCHS 1)
This is an amendment (“Amendment”) to that certain Power Purchase Agreement made by and between the Redwood Coast Energy Authority (“Buyer”) and North Coast Highway Solar 1, LLC (“Seller”) dated June 25, 2020, and amended on March 28, 2022 (collectively, “Agreement”). This Amendment is effective on _________, 2024.

RECITALS
WHEREAS, Buyer launched its Feed-In Tariff Program with the purpose of fostering the development of local, small-scale renewable generation resources; WHEREAS, Seller experienced Project development delays beyond its control resulting in Seller’s inability to achieve certain milestones by the corresponding agreed upon target dates, including achieving a Commercial Operation Date (“COD”) of November 1, 2021, which Seller extended pursuant to the terms of the Agreement; WHEREAS, Seller elected to pay daily delay damages to Buyer instead of terminating the Agreement and forfeiting the Reservation Deposit out of commitment to achieving successful Project completion in a commercially prudent manner; WHEREAS, despite Seller’s desire to see Project completion, the total amount of daily delay damages to be paid by Seller until the currently anticipated COD is estimated to exceed Seller’s expected revenue under the Agreement, which would not be economically viable for the Project;
WHEREAS, consistent with the Parties’ respective goals for achieving successful Project completion, the Parties desire to amend the Agreement to reduce the daily delay damage rate as set forth in this Amendment.

NOW THEREFORE, in consideration of the mutual covenants, conditions and terms recited herein and made a material part hereof, the Parties agree to amend the Agreement as follows:

1. Daily Delay Damages. Section 2.6.4 is hereby deleted in its entirety and replaced with the following:
“2.6.4 Notwithstanding anything in this Agreement, if Seller is unable to achieve Commercial Operation by the expected Commercial Operation Date specified in Section 2.6.1, which may be extended pursuant to Section

2.6.2, then Seller shall either (i) terminate the Agreement, in which case Buyer may retain the full Reservation Deposit, or (ii) pay to Buyer daily delay damages in the amounts and pursuant to the conditions set forth in Sections 2.6.4.1 and 2.6.4.2.
78 AMENDMENT No. 2 To PPA, NCHS 1 Page 2 of 3

2.6.4.1 Beginning on the expected Commercial Operation Date specified in Section 2.6.1, as extended pursuant to Section

2.6.2, Seller shall pay to Buyer daily delay damages in the amount of ten cents ($0.10) for each kilowatt of Contract Capacity for each day until Seller achieves the first milestone specified in Table 1, below. At such time Seller achieves the first specified milestone, Seller shall pay to Buyer daily delay damages at the corresponding rate shown in Table 1. Seller shall thereafter continue to pay such daily delay damages at the specified rate until achievement of the next milestone, at which time Seller shall pay daily damages at the corresponding rate shown. In the case of the last milestone, daily delay damages shall be payable to Buyer upon achievement of the COD.

Table 1. Delay Damage Payment Schedule

2.6.4.2 Beginning on the Effective Date of this Agreement, Seller shall include progress updates to Buyer of its commercially
reasonable efforts to meet the milestones identified in Table 1 as part of Seller’s regular Project development report required in Section 6.9 of this Agreement. Upon achievement of any
milestone identified in Table 1, Seller shall promptly advise Buyer thereof in writing of the date of milestone achievement and shall promptly submit such documents as reasonably
requested by Buyer to substantiate milestone achievement.”

2. Ratification of Agreement. The terms and conditions of the Agreement, including all exhibits and attachments, are ratified in their entirety except to the extent inconsistent with the terms and provisions of this Amendment. In the event of such inconsistency, this Amendment shall control.

Milestone Delay Damage Rate
($/kW/day)
Completion of PG&E Pole Placement Restudy $0.075
Approval of Conditional Use Permit by County of Humboldt $0.05 Issuance of Notice to Proceed with Construction to Contractor $0.025 79 AMENDMENT No. 2 To PPA, NCHS 1 Page 3 of 3
IN WITNESS WHEREOF, the Parties have executed this Amendment No. 2 effective as of the date written above.

SELLER, North Coast Highway Solar 1, LLC
By: ______________________ Date: _________________
Name:

Title:

BUYER, Redwood Coast Energy Authority
By: _______________________ Date: _________________
Eileen Verbeck, Interim Executive Director
80 4
Exhibit B: Second Amendment to North Coast Highway Solar 2 Power Purchase Agreement
81 AMENDMENT No. 2 To PPA, NCHS 2 Page 1 of 3
AMENDMENT No. 2 TO

POWER PURCHASE AGREEMENT
(Feed-In Tariff, NCHS 2)
This is an amendment (“Amendment”) to that certain Power Purchase Agreement made by and between the Redwood Coast Energy Authority (“Buyer”) and North Coast Highway Solar 2, LLC (“Seller”) dated June 25, 2020, and amended on March 28, 2022 (collectively, “Agreement”). This Amendment is effective on _________, 2024.

RECITALS
WHEREAS, Buyer launched its Feed-In Tariff Program with the purpose of fostering the development of local, small-scale renewable generation resources; WHEREAS, Seller experienced Project development delays beyond its control resulting in Seller’s inability to achieve certain milestones by the corresponding agreed upon target dates, including achieving a Commercial Operation Date (“COD”) of November 1, 2021, which Seller extended pursuant to the terms of the Agreement; WHEREAS, Seller elected to pay daily delay damages to Buyer instead of terminating the Agreement and forfeiting the Reservation Deposit out of commitment to achieving successful Project completion in a commercially prudent manner; WHEREAS, despite Seller’s desire to see Project completion, the total amount of daily delay damages to be paid by Seller until the currently anticipated COD is estimated to exceed Seller’s expected revenue under the Agreement, which would not be economically viable for the Project;
WHEREAS, consistent with the Parties’ respective goals for achieving successful Project completion, the Parties desire to amend the Agreement to reduce the daily delay damage rate as set forth in this Amendment.

NOW THEREFORE, in consideration of the mutual covenants, conditions and terms recited herein and made a material part hereof, the Parties agree to amend the Agreement as follows:

1. Daily Delay Damages. Section 2.6.4 is hereby deleted in its entirety and replaced with the following:
“2.6.4 Notwithstanding anything in this Agreement, if Seller is unable to achieve Commercial Operation by the expected Commercial Operation Date specified in Section 2.6.1, which may be extended pursuant to Section

2.6.2, then Seller shall either (i) terminate the Agreement, in which case Buyer may retain the full Reservation Deposit, or (ii) pay to Buyer daily delay damages in the amounts and pursuant to the conditions set forth in Sections 2.6.4.1 and 2.6.4.2.
82 AMENDMENT No. 2 To PPA, NCHS 2 Page 2 of 3

2.6.4.1 Beginning on the expected Commercial Operation Date specified in Section 2.6.1, as extended pursuant to Section

2.6.2, Seller shall pay to Buyer daily delay damages in the amount of ten cents ($0.10) for each kilowatt of Contract Capacity for each day until Seller achieves the first milestone specified in Table 1, below. At such time Seller achieves the first specified milestone, Seller shall pay to Buyer daily delay damages at the corresponding rate shown in Table 1. Seller shall thereafter continue to pay such daily delay damages at the specified rate until achievement of the next milestone, at which time Seller shall pay daily damages at the corresponding rate shown. In the case of the last milestone, daily delay damages shall be payable to Buyer upon achievement of the COD.

Table 1. Delay Damage Payment Schedule

2.6.4.2 Beginning on the Effective Date of this Agreement, Seller shall include progress updates to Buyer of its commercially
reasonable efforts to meet the milestones identified in Table 1 as part of Seller’s regular Project development report required in Section 6.9 of this Agreement. Upon achievement of any
milestone identified in Table 1, Seller shall promptly advise Buyer thereof in writing of the date of milestone achievement and shall promptly submit such documents as reasonably
requested by Buyer to substantiate milestone achievement.”

2. Ratification of Agreement. The terms and conditions of the Agreement, including all exhibits and attachments, are ratified in their entirety except to the extent inconsistent with the terms and provisions of this Amendment. In the event of such inconsistency, this Amendment shall control.

Milestone Delay Damage Rate
($/kW/day)
Completion of PG&E Pole Placement Restudy $0.075
Approval of Conditional Use Permit by County of Humboldt $0.05 Issuance of Notice to Proceed with Construction to Contractor $0.025 83 AMENDMENT No. 2 To PPA, NCHS 2 Page 3 of 3
IN WITNESS WHEREOF, the Parties have executed this Amendment No. 2 effective as of the date written above.

SELLER, North Coast Highway Solar 2, LLC
By: ______________________ Date: _________________
Name:

Title:

BUYER, Redwood Coast Energy Authority
By: _______________________ Date: _________________
Eileen Verbeck, Interim Executive Director
84

Page 1 of 3 ends

STAFF REPORT
Agenda Item # 4.8
AGENDA DATE: September 26, 2024
TO: Board of Directors
PREPARED BY: Mike Avcollie, Senior Manager, Infrastructure Projects SUBJECT: North Coast Plug-in Electric Vehicle Charging Network Phase 2 Construction Contract Award

BACKGROUND
In 2022, RCEA received a Notice of Proposed Award of $700,000 from the California Energy Commission (CEC) for the North Coast Plug-in Electric Vehicle Charging Network Phase 2 project focused on placing Level 2 electric vehicle service equipment at 10 strategic community hubs in Humboldt County by 2026. Since then, Staff have been implementing the project, including contracting for design and engineering work for all 10 sites, and subsequently soliciting bids for construction at sites in Orleans, Redway, Garberville, Eureka, and Fortuna.

The Board has awarded three construction contracts based on bids received for those five areas. On August 14, 2024, Staff issued invitation for bids (IFB) IFB-24-505 for all necessary construction work at Azalea Hall/McKinleyville Library in McKinleyville, at Mad River Community Hospital and at Carlson Park in Arcata.

SUMMARY
In response to IFB-24-505, RCEA received three (3) bids (A.T.C, Hooven & Reese Inc., and Adams Commercial General Contracting). The lowest bid was provided by Hooven & Reese Inc. for a total bid amount of $142,414.30. Copies of the three bids received are attached to this report.

Responsiveness of Hooven & Reese Inc.’s Bid
The lowest bidder, Hooven & Reese Inc, did not submit a completed Bidder’s Qualification Form as was requested in the IFB. In its place, this bid contained separately generated sheets answering the detailed questions asked on the Bidder’s Qualification Form about actual prior construction projects in the Form’s Part B, sub question 3.

Determining the responsiveness of a bid is within the discretion of the awarding agency, and is made based on evaluating the face of the bid rather than the qualifications of the underlying bidder. A bid may be responsive even if it contains minor deviations from the bid requirements as long as the deviations are inconsequential and do not:

1. Affect the amount of the bid;

2. Affect the ability to make bid comparisons;

3. Provide a potential vehicle for favoritism;
NOTE: This staff report was revised
on Sept. 24, 2024.

Page 2 of 3 ends

4. Influence potential bidders to refrain from bidding; or

5. Give a bidder a competitive advantage over others by, for example allowing it to withdraw the bid without forfeiting its bid security.

Information provided elsewhere in Hooven & Reese’s bid supply answers to those questions of the Bidder’s Qualification Form that were not completed. Importantly, the omissions of this information from the Form especially when supplied elsewhere in the bid do not appear to affect the items listed above (1-5). Staff therefore believe that this bid is responsive to the IFB and recommends that the Board waive as inconsequential any discrepancies between the bid and the IFB instructions to award the contract.

Responsiveness of A.T.C.’s Bid
The next lowest bidder, A.T.C., submitted an outdated Price Breakdown Form instead of the updated version provided by addendum to the IFB. The question of A.T.C. bid’s responsiveness is moot if Hooven & Reese’s bid is deemed responsive.

Bid Protest
On September 20, 2024, RCEA received a bid protest from Adams Commercial General Contracting (ACGC inc). Specifically, ACGC inc. asserts that the bid packets submitted by Hooven & Reese, Inc. and A.T.C. are nonresponsive and should not be considered by RCEA.

Additionally, ACGC inc. states that A.T.C.’s registration with the Department of Industrial Relations (DIR) for public works projects is expired.

As discussed above, the bid submitted by Hooven & Reese is responsive. Although the responsiveness of A.T.C.’s bid is not relevant, Staff notes that the Price Breakdown Form was updated by narrative scope only. The price breakdown information required on that Form remained unchanged. A.T.C. certified receipt of the addendum that updated this Form, with the result that A.T.C. would be held to the price break down supplied in its bid. Additionally, the DIR database shows that A.T.C. is registered with the DIR for public works projects with a registration expiration of June 30, 2025.

ALIGNMENT WITH RCEA’S STRATEGIC PLAN
By expanding our existing EV charging network and enabling future resiliency work at locations across the county, this project contributes to these Strategic Plan goals:
• 2.1.5 Integrate Distributed Energy Resources
• 3.2.2 Promote Advanced Fuels
• 3.2.3 Support Electric Vehicle Adoption
• 3.3.1 Develop Transportation Electrification Infrastructure • 3.3.4 Promote Vehicle-to-Grid Connection

EQUITY IMPACTS
The CEC grant award requires that at least 50% of project costs be spent on low-income or disadvantaged communities or both. All project sites are within the AB 1550 Low-Income Communities designated area, and an August 2022 CEC staff report “Localized Health Impacts

Page 3 of 3 ends

Report” lists our project sites as meeting one or more Environmental Justice indicators for age, poverty, or unemployment.

FINANCIAL IMPACT
The project budget is $875,000, comprised of $700,000 in CEC grant funds and $175,000 in RCEA matching funds. The previously awarded design and construction costs total $458,919.36; award of this contract will increase the total to $601,333.66 which is within budget.

STAFF RECOMMENDATION
Staff Recommends:

1. Determine that the Hooven & Reese and A.T.C. bids are responsive to IFB-24-505.

2. Reject the bid protest submitted by ACGC, inc. on September 20, 2024.

3. Award a contract for the installation of electric vehicle charging stations for the RCEA North Coast Plug-In Electric Vehicle Charging Network Expansion Project to Hooven & Reese Inc. in the amount of $142,414.30 for the McKinleyville and Arcata sites; and authorize the Executive Director to execute all applicable documents subject to RCEA General Counsel review.

ATTACHMENTS

1. IFB-24-505 - EVSE Installation ARCATA & MCKINLEYVILLE (linked online at https://redwoodenergy.org/board-of-directors/)

2. Hooven & Reese Bid

3. ATC Bid

4. ACGC Bid

5. Bid Tabulation Form

6. ACGC, inc. Bid Protest
SECTION 00 43 93 - BID SUBMITTAL CHECK LIST
The following documents shall be submitted by each Bidder, as part of their complete Bid:

RCEA2024
IFB-24-505
Section 00 41 00 -Bid Form
Section 00 43 13 -Bid Security Form (Bid Bond)
Section 00 43 36 - Subcontractor List
Section 00 45 13 -- Bidder's Qualifications
Section 00 45 19 - Non-Collusion Declaration
Section 00 45 26- Workers' Compensation Certification
Section 00 45 48 - Debarment and Suspension Certification ~ND OF SECTION 00 43 93

BID SUBMITTAL CHECK LIST
Section 00 43 93 - Page 2
87 SECTION 00 4100-BID FORM
TO: Redwood Coast Energy Authority
Installation of EV Charging Stations for RCEA Charging Network-ARCATA &

MCKINLEYVILLE
RCEA Project No. IFB-24-505
Name of Bidder:

Business Address:

Telephone Number:

Residence Address:

Hooven & Reese, Inc.
(Note: Name must be exactly as it appears on Contractor's License.) 3445 Central Ave
McKinleyville, CA 95519
707-839-1291
3445 Central Ave
McKinleyville, CA 95519
The work to be done shall be constructed in accordance with the Contract Documents and the General Prevailing Wage provisions as specified in the "Invitation To Bidders".

Bids are submitted for the entire work. The amount of "The Bid" for comparison purposes will be the determination of the apparent low bid as specified in Section 00 21 13, "Instructions to Bidders".

The Bidder shall set forth for the Base Bid and each Alternate, if any, in clearly legible figures, a written lump sum price and a numeric lump sum price.

In case of a discrepancy between the two notated prices, the written price shall prevail, unless, however, if the amount set forth in writing is ambiguous, unintelligible, or uncertain for any cause, or is omitted, then the amount set forth in the numeric column for the item shall prevail.

If this proposal shall be accepted and the undersigned fails to enter into the Contract and to give the bonds as required within ten (10) calendar days after the Bidder has received notice that the contract has been awarded, RCEA may, at its option, determine that the Bidder has abandoned the Contract, and thereupon this bid and the acceptance thereof shall be null and void and the forfeiture of such security accompanying this bid shall be forfeited and become the property ofRCEA.

The undersigned, as Bidder, declares that the only persons or parties interested in this bid as principals are those named therein; that the bid is submitted without collusion with any other person, firm, or corporation; that Bidder has carefully examined the location of the proposed work, the proposed form of contract, and the plans therein referred to; and proposes and agrees if this bid is accepted, that Bidder will contract with RCEA in the form of RCEA' s contract, to provide al I necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the material specified in the contract, in the manner and time therein RCEA2024
IFB-24-505

BID FORM
Section 00 41 00 - Page 1
88 prescribed, and according to the requirements of the Owner's Engineer as therein set forth, and that he will take in full payment therefor the following item prices to wit:

Receipt and compliance with the following Addenda to the Contract Documents is acknowledged:

I. Addendum No._1_ Dated 8/29/24

2. Addendum No._2_ Dated 9/13/24

3. Addendum No. Dated --

4. Addendum No. Dated --

5. Addendum No. Dated --
I, _T_im_H_o_o_v_e_n ______________________ _, as an agent for Hooven & Reese, Inc. declare under penalty of perjury under the laws of the State of California, that the information contained in this Bid is true and correct.

Executed at McKinleyville California, on _9_/1_7 ____ ....:, 2024 The project shall be complete within the time limits specified in Section 00 22 13, "Supplementary Instructions To Bidders." The undersigned is aware the Contract includes provisions for liquidated damages as specified in Section 00 21 13, "Supplementary Instructions To Bidders," if the Project is not completed within the agreed time of completion.

THE UNDERSIGNED, as Bidder, proposes the following:

BASE BID:

To furnish and complete the entire work as shown on the drawings and listed in the specifications, including required contract, bonds, and insurance, without additions or subtractions on account of specified alternates, for the sum of:

Base Bid (Lump Sum):

One Hundred Forty-Two Thousand Four Hundred Fourteen and 30/100$ __ 142,414.30 _..;.. _______ .....

Total Amount in Words Total
RCEA2024
IFB-24-505

BID FORM
Section 00 41 00 - Page 2
89 PRICE BREAKDOWN:

RCEA will provide the new charging station equipment (dual-port ChargePoint CP602 l units) to be installed at each site, so those costs should be omitted from this bid.

Note the following details about civil work at each site:
• Civil work at the Azalea Hall/McKinleyville Library site and the Mad River Community Hospital site will include foundations, trenching, backfilling, concrete, paving, and striping associated with construction of parking stalls.
• Civil work at the Carlson Park site will be limited to marking/designating parking stalls as ''EV Charging Only .. and installation of two (2) ,,heel stops. Wheel stops shall be: Rubberform Wheel Stop RF-RBR I 4HDG. charging station foundations, bollards and st=rif)ing associated with designation of f)arking stalls. No new paving for parking stalls will be required at the Carlson Park site.

Note the following details about electrical work at each site:
• Electrical work at the Azalea Hall/McKinleyville Librruy site and the Mad River Community Hospital site will include the meter panel, breakers, pull boxes, wire, conduit, and installation of the RCEA-provided chru·ging stations.
• At the Carlson Pru·k site, the meter socket and CT cabinet, disconnect and subpane l will be provided and installed by others and is not in scope for this contract. • Electrical work at the Carlson Park site will be limited to providing and installing EV circuit conductors (in conduit by others). breakers for EV circuits (in sub-panel by others). and installation and activation of EV Charging Stations (Stations provided by others, chru·ging station foundations provided by others). include breakers, conductors, and installati on ofRCEA f)rovided charging stations
Please provide information below to break out the civil and electrical work for easier evaluation.

Site
Azalea Hall/McKinleyville
Library site
Mad River Community Hospital
site
Carlson Park site
Total Project Cost
BID ALTERNATES:

None for this project

UNIT PRICES
RCEA 2024
IFB-24-505
Civil Cost
$
38,673.25
$ 43,453.77
3,372.99
$85,500.01
Electrical Cost
$
26,999.91
$ 29,253.30
661.08
$56,914.29
Total Site Cost
$
$
$
65,673.16
72,707.07
4,034.07
142,414.30
BrDFORM
Section 00 4 1 00 - Page 3
90 For changing quantities of work items from those indicated on the contract drawings and specifications, upon written instructions from the Owner's Engineer, the following prices shall prevail:

1. None for this project
The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance etc., to cover the finished work of the several kinds called for. Changes shall be processed in accordance with the General Conditions.

Proposal Signature Page
Accompanying this proposal is _B_i_d_d_e _r's_ B_o_n_d ______ ____ _____ _ (Insert the words "Cash($)", "Cashier's Check", "Certified Check", or "Bidder's Bond", as the case may be) in the amount of at least ten percent (I 0%) of the total Bid Price submitted. The names of all persons interested in the foregoing proposal as Principals are as follows:

Nick Reese, President; David Hooven, VP;
Tim Hooven, CFO; Pat Hooven, Secretary
(NOTE: lfa Bidder or other interested person is a Corporation, state the legal name of the corporation, also names of the president, secretary, treasurer, and manager thereof; if a Co-partnership, state the true name of the firm, also state the names ofall individual co-partners composing the film; if the Bidder or other interested person is an Individual, state the first and last names in full.) Licensed in accordance with the Act providing for the registration of Contractors:

License No.: 1078205 Expiration Date: _
7_1_3_11_2_5 _ _ ___ _
DfR Number: PW-LR-1000859605
By my signature on this bid I certify, under penalty of perjury under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code Section IO 162, and I 0232, are true and correct and that the bidder has complied with the requirements of Section 8102 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2 of the California Administrative Code). By my signature on this bid I further certify, under penalty of perjury under the laws of the State of Californi a and the United States of America, that the No[\"'f;9~w,ion Declaration required by Title 23 United States Code, Section 11 2, and Public Contract Co~~ ctioR7~~~nd the Title 49 Code of Federal Regulation, Part 29 Debarment and Suspension Certifi~on ~~~(<K'tJ"ect. ~-<-..··· ·vl'fA'l~··.u·~-.. fLJ.J/CJ0sEA~--~~
~>~() 2021 :<(j_:"'-9_11_71_2_4 ______ _
Signature of Bidder -:. 0
0 -...~/ a~"-/<": Date ...... );~ IFO~·: () ... If a Bidder is a Corporation or a Co~~~_ne~~~-·· , , ' .. .. ,,,,, .... ,,,, RCEA 2024
IFB-24-505
Hooven & Reese, Inc.

Name of Corporation or Firm Name of Co-partnership
BlD FORM
Section 00 4 1 00 - Page 4
91 92
,,,, .. ,,,,,
Signatures ofofficer(s) or partners authorized to sign contracts on behalf of the Corporation or Co-,,'''' ~ .... B~f ,, partnership, Corporations require signature by 2 (two) corporate officers: ~ ~ .• 0~0~j;-., (P'-:. ... /Jj .• (J ~ •. {\'\";.

CFO 2>[ SEA~ ~- ~
1 ~ame
i/, f', ---
Title -0\C'> 2021 ~i-:
_______ \O;~~o~ts~..: Title ,,; Y •••.. •• , ....
,,, * ,,,' ,,,,,.,,,,
If Signature is by an agent, other than an officer of a corporation or a member of a partnership, a Power of Attorney must be on file with RCEA prior to opening Bids or may be submitted with the Bid; otherwise, the Bid will be disregarded as irregular and unauthorized.

RCEA 2024
IFB-24-505
END OF SECTION 00 41 00

BID FORM
Section 00 4 1 00 - Page 5
93 SECI'ION 00 43 13-BID SECURITY FORM (BID BOND)
KNOW ALL PERSONS BY THESE PRESENTS:

We, the Contractor, Hooven & Reese. Inc. as principal ("Principal;, and Contractors Bonding and Insurance Company , a corporation, oiganized and existing under and by virtue of the laws of the State of Illinois and authorized to do surety business in the State of California, as surety ("Surety"), are firmly bound unto the Redwood Coast Energy Authority ("RCEA"), State of California, as Obligee in the penal sum of Ten Percent of Bid Amount .

Dollam ($10% of Bid Amount). representing ten percent (I 00/4) of the total amount of the bid of the Principal submitted to RCEA for the work described below for the payment of which sum in lawtbl money of the United States, we bind ourselves, our heirs, executors, administrators, successors, and 1migns, jointly and severally, flnnly by this agteement.

Whereas, the Principal has submitted the accompanying bid ("Bid") dated September 17, 2024 , for the following project (
16Project"):

Installation of EV Charging Stations for RCEA Chmging Network-ARCATA &

MCKINLEYVILLE
RCEA Project No. IFB-24-S0S
THE CONDITION OF THIS OBLIOA TION IS SUCH that whereas the Principal has submitted a bid to the Redwood Coast Energy Authority, State of Califomia, for all work specificaJly described in the accompanying bid;
NOW, THEREFORE, if the aforesaid Principal is awarded the contract, and within 1he time and manner required under the specifications, after the prescribed fonns are presented to Principal for signature, enters into a written contract in the prescribed fonn, in accordance with the bid, and files the two bonds, one guaranteeing faithful perfonnance and the other guaranteeing payment for labor and materials as required by law, or if the said Principal shall fully reimburse and save hannless the Obligee from any damage sustained by the Obligee through failure of the Principal to enter into the written contract and to file the required perfonnance and labor and material bonds, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

In the event suit is brought upon this bond by the Obligee and judgment is recovered, the Surety shall pay all costs incurred by the Obligee in such suit, including a reasonable attorney's fee to be fixed by the Court.

In witness whereof the above-bound parties have executed this instrument under their several seals this 16th day of September , 2024, the name and corporate seal of each corporate Party being hereunder affixed, and these presents duly signed by its undersigned representative. pursuant to the authority ofits governing body.

RCEA2024
IFB-24-SOS

BID SECURITY FORM (BID BOND)
Section 00 43 13 - Page I
94 ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.

State of California
County of Marin
On Jpp±e-vh k.xt: \ k', ')..?~~ before me, Emma Nichols, Notary Public (insert name and title of the officer)
personally appeared Jon Richard Sullivan
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies). and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENAL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
(Seal)
95 POWER OF ATTORNEY
RLI Insurance Company
Contractors Bonding and Insurance Company
9025 N. LinJbcn?h Dr. Peoria. IL 61615
Phnnc: -800-645-2-102
Know All Men by These Presents:

That this Power of Attorney is not valid or in effect unkss nllached to the bond which it authorizes executed. but may be detached by the approving officer if desired.

That RU Insurance Company and/or Contractors Bonding and Insurance Company_ each an Illinois corporation. {separately and together, the "Company") do hereby make. constitute and appoint:

Susan J. McGowan, Jon Richard Sullivan, Karen Rhodes. Tamnw Bates. Emmalvn Nichols. joimlv or scvcrallv in the City of Novato , State of California its true and lawful Agcnt(s) and Attomcy(s) in Fact. with full power and authority hereby conferred. to sign, execute. acknowledge nnd deliver for and on its behalf as Surcty. in gcneral. any and all bonds and undertakings in an amount not to exceed Twcntv Five Million Dollars ( $25_000_000.00 ) for any single obligation.

The acknowledgment and execution of such bond by the said Allorney in Fact shall be as binding upon the Company as if such bond had been executed and acknowledged by the regularly clech:d officers or the Company.

RLI Insurance Company and/or Contractors Bondin~ and Insurance Compa ny. as applicable, have each funhcr ccnificd that the following is a true and exact copy of a Resolution adopted by thl' Board of Directors of each such corporation. and is now in force. to-wit:
"All bonds, policies, undertakings. Powers of Auorney or oth.:r obligations of the coq,orarion shall be executed in the corporate name of the Company by the President, Sccrcta1y. any Assistant Sccn:ta1y. Treasurer. or any Vice President. or by such other officers as the Board of Directors may authorize. The President. any Vi1.:..: Prcsidcnt. Secretary, any Assistant Secretary. or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority lo issu,: bonds, policies or undenakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers or Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." fN WITNESS WHEREOF, the RLI Insurance Company
caused these presents to be executed by its respective
and/or Contractors Bonding and Insurance Company, as applicable, have Vice President with its corporate seal affixed this 10th day of Mav 2022 .

State of Illinois
County of Peoria } ss
On this 20th day of May ?012 . befor~ me. a Nul:tr) Public. personally appeared Barton W Oavis . who being by me dul~ sworn. acknowledged that he signed the above Power of Allomcy as the aforesaid officer of the RU Insurance Company and/or Contractors Bonding and Insurance Company and acknowkdged said instrument to be 1h.: , 11luntary act and deed of said corporation.

By: --- --- Catherine D. Glover
CATHERINE 0. GLOVEA . OFFICIAL SEAL
Notary Public -S-01 lllinobl
MyCotrln!alon Elcp,-
March 24, 2024
Noiar~ Public
RU Insurance Company
Contractors Bonding and Insurance Company
By:

Barton Vice President

CERTIFICATE
I. 1he undersigned ollicer of RU Insurance Company and/or Contractors Bonding and Insura nce Company. do hereby certify that the allachcd Power of Attorney is in full force and effect and is irrevocable: and furthennorc. 1hat 1he Resolution of the Company as set fonh in 1hc Power of !\llomcy. is now in force. In testimony whereof. I have hereunto set my hand and the seal of 1hc RLI Insurance Company and/or Contractors Bondin:,? and Insurance Company 1his --1.filh__ d3y of September . ~- RLI Insurance Company
Contractors Bondin:: and Insurance Company
C orpora1e Secretary
,\0058D1 9
96 Attach Attorney-In-Fact Certificate
Hooven & Reese, Inc.

Principal/Contractor
By- -----
Title: _l+Q__._ ____________ _
(Corporate Seal)
Contractors Bonding and Insurance Company
Surety
B __ _
Jc:5-n Richard Sullivan, Attorney-in-Fact
Title
To be signed by Principal and Surety and Acknowledgment and Notary Seal to be attached.

RCEA2024
IFB-24-505
END OF SECTION 00 43 13

BID SECURITY FORM (BID BOND)
Section 00 43 13 - Page 2
97 SECTION 00 43 36 - SUBCONTRACTOR LIST
The Bidder shall list all Subcontractors in accordance with Article 18 of the Supplementary General Conditions.

Name of Subcontractor,
CA Contractor License and
DIR Number
Hooven & Co., Inc.
663866, 08/25, "A"
General Engineering
DIR# 1000013619
RCEA2024
IFB-24-505
Address
3445 Central Avenue,
McKinleyville CA 95519
END OF SECTION 00 43 36
Description of Work
to be Performed
Civil

SUBCONTRACTOR LIST
Section 00 43 36 - Page 1
98 Similar Projects
i. Year contract awarded 2021
ii. Type of work: EV Charging
iii. Contract completion time called for/actual completion time 6 mos, 1.5 years actual (Material Delays)
iv. Contract price 13,500
v. For whom performed, including person to call for a reference and telephone number.RCEA (707) 269-1700
vi. Location of work Eureka
vii. Number of stop notices file. 0
viii. For each contract, list any lawsuits filed relating to that contract in which you were a defendant or plaintiff. n/a
ix. Amount of liquidated damages assessed. n/a
i. Year contract awarded 2022
ii. Type of work: Generator Installation
iii. Contract completion time called for/actual completion time 6 months, 1 year iv. Contract price 80,361
v. For whom performed, including person to call for a reference and telephone number.

City of Fortuna, 707-725-7600
vi. Location of work Fortuna CA
vii. Number of stop notices file.a
viii. For each contract, list any lawsuits filed relating to that contract in which you were a defendant or plaintiff. n/a
ix. Amount of liquidated damages assessed. n/a
i. Year contract awarded 2023 Hooven Co Eureka Bus Garage ii. Type of work Electrical installation and troubleshooting iii. Contract completion time called for/actual completion time n/a iv. Contract price 91,000
v. For whom performed, including person to call for reference and phone number Hooven & Co, 707-839-1291
vi. Location of work Eureka
vii. Number of stop notices filed 0
viii. For each contract list any lawsuits filed relating to that contract in which you were a defendant or plaintiff n/a
ix. Amount of liquidated damages assessed. n/a
i. Year contract awarded
ii. Type of work
iii. Contract completion time called for/actual completion time iv. Contract price
v. For whom performed, including person to call for reference and phone number vi. Location of work
vii. Number of stop notices filed
viii. For each contract list any lawsuits filed relating to that contract in which you were a defendant or plaintiff
99 Projects for government agencies
i. Year contract awarded 2021
ii. Type of work: EV Charging
iii. Contract completion time called for/actual completion time 6 mos, 1.5 years actual (Material Delays)
iv. Contract price 13,500
v. For whom performed, including person to call for a reference and telephone number.RCEA (707) 269-1700
vi. Location of work Eureka
vii. Number of stop notices file. 0
viii. For each contract, list any lawsuits filed relating to that contract in which you were a defendant or plaintiff. n/a
ix. Amount of liquidated damages assessed. n/a
i. Year contract awarded 2022
ii. Type of work: Generator Installation
iii. Contract completion time called for/actual completion time 6 months, 1 year iv. Contract price 80,361
v. For whom performed, including person to call for a reference and telephone number.

City of Fortuna, 707-725-7600
vi. Location of work Fortuna CA
vii. Number of stop notices file.a
viii. For each contract, list any lawsuits filed relating to that contract in which you were a defendant or plaintiff. n/a
ix. Amount of liquidated damages assessed. n/a
i. Year contract awarded 2024
ii. Type of work Remodel
iii. Contract completion time called for/actual completion time 90 days, 60 days iv. Contract price 13,181
v. For whom performed, including person to call for a reference and telephone number.

HCRD - 707-442-6508
vi. Location of work McKinleyville
vii. Number of stop notices file.a
viii. For each contract, list any lawsuits filed relating to that contract in which you were a defendant or plaintiff.n/a
ix. Amount of liquidated damages assessed.n/a
100
SECTION 00 45 19- NON-COLLUSION DECLARATION
The undersigned declares:
1 am the CFO of Hooven & Reese, Inc. , the party making the foregoing -------- bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other Bidder.

All statements contained in the bid are true. The Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty ofperjuiy under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on t 9117124 [date], a\/ft~ini~; [city], _C_A _____ _ ___ (stateJ. ,,,, ~ R~s,
Signature of Bidder
Date: 9/17/24
--~ •~o~·.~'d\', :~/c.,0
SEA1~\~ >• L - -
~0 io 2021 ~J-~ ~ cf=f<,Fo~~-b~~ ',, 'Y •··········••• , ... ,, ,,, * ,, ,,' ''""''''
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

RCEA 2024
IFB-24-505
END OF SECTION 00 45 19

NON-COLLUSION DECLARATION
Section 00 45 19 - Page 6
101
SECTION 00 45 26 - WORKERS' COMPENSATION CERTIFICATION ST A TEMENT Labor Code §3700 in relevant part provides:
"Every employer except the State shall secure the payment of compensation in one or more of the following ways:
(a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations a certificate of consent to self-insure, which may be given upon furnishing proof satisfactory to the Director oflndustrial Relations of ability to self-insure and to pay any compensation that may become due to his employees."
I am aware of the provisions of §3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake sel~ilrtY)ince in accordance with the provisions of that Code, and 1 will comply with such provisions befor~~~ performance of the work of this Contract and will require all Subcontractors to do the s~~•r ~ 0{:,6~~&'',, ... ~~ ··~ '"1)'"". '.A'\:, : """"":(j 'O ~ A. I,, \\'. ":, --up St:r''- .~ • §;.,{ 202'\ ~}-§ -: o··.0 ~: :z:

Signature of Contractor \ d;.1,~JF<.ff.l0./
',, ,....,. ····~ ,,' ,, 7' ,, ,,,,,. .. ,,,,
Date: 9/17 /24
In accordance with Article 5 (commencing at § 1860), Chapter 1, Part 7, Division 2 of the Labor Code, the above certificate must be signed and filed with the awarding body prior to performing any work under this Contract.

RCEA 2024
IFB-24-505
END OF SECTION 00 45 26

WORKERS' COMPENSATION CERTIFICATION STATEMENT
Section 00 45 26 - Page I
102
103
SECTION 00 45 48 - DEBARMENT AND SUSPENSION CERTIFICATION TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The CONTRACTOR, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:

I. is not currently under suspension, debarment, vol untary exclusion, or determination of ineligibility by any Federal, State, or local agency;

2. has not been suspended, debarred, voluntarily excluded, or determined ineligible by any Federal, State, or local agency within the past 3 years;

3. does not have a proposed debarment pending; and

4. has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent j urisdiction in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

Exceptions will not necessarily result in denial of award but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

NOTE: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Sign in~ this Proposal on the signature portion thereof shall also constitute signature of this Certifdh~'- R" 's' I I I, ,,· ~ ~,, ... ' ~~·o··, ··••••· ,
Signature of Contractor
Date: 9/17/24
RCEA 2022
IFB-24-505
' .. .. " ~ .•·o fi<i_x •. u\ .. , :: l.JJ ... 0 s EA• ~ • .. ((\: ~>: L ~~ • :
-o;o 2021 ~l : . :-,.; . -. - ·~ ~·~· '-,,?J:;·{{f..9.f.·:·6 /. , ' ,,,, * ,,,' ,,,, .. ,,,,
END OF SECTION 00 45 48

DEBARMENT AND SUSPENSION CERTIFICATION
Section 00 45 48 - Page I
104

REDWOOD COAST
Energy Authority
IFB-24-505 Addendum No.1:

Questions from Bidders:

1. Question: What is in-scope of this contract at the Carlson Park site? Answer: Civil work at the Carlson Park site will be limited to marking/designating parking stalls as "EV Charging Only" and installation of two (2) wheel stops. Wheel stops shall be:

Rubberform Wheel Stop RF-RBR14HDG. No new paving for parking stalls will be required at the Carlson Park site.

Electrical work at Carlson Park will be limited to providing and installing EV circuit conductors (in conduit by others), breakers for EV circuits (in sub-panel by others), and installation and activation of EV Charging Stations (stations provided by others, charging station foundations provided by others).

2. Question: Will RCEA provide an updated Bid form to reflect the updated scope of work? Answer: Yes, Bidders must use the updated Bid Form, attached to this Addendum, for their bid submission.

3. Can RCEA provide a copy of the attendee's list from the mandatory pre-bid conference? Answer: Yes, see attached.

4. Question: Can RCEA provide the PG&E construction drawings for the McKinleyville Library and Mad River Community Hospital sites?
Answer: Yes, see attached.

5. Is it possible to substitute an Eaton product for the specified Siemens panel board? Answer: Yes, it is acceptable to substitute an Eaton product in place of the Siemens product.

PG&E has approved the switch gear submittal, so any alternative has to be completely equivalent in meeting all PG&E Greenbook requirements. Bidders may submit spec sheets for proposed substitutions to RCEA by 3:00 p.m. PDT, Wednesday, September 4, 2024, and RCEA www.redwoodenergy.org
633 3rd Street - Eureka, CA 95501
707.269. 1700 (local) - 800.931-RCEA (toll-free) - 707.269.1777 (fax) 105
will submit to PG&E for review and approval and will share PG&E's response with bidders, if possible, no later than 72 hours prior to the bid deadline.

6. Question: Are the EVCS signage details (detail #10) and signpost details (detail #9} that are shown as "optional" on sheet Cl required for this project.

Answer: No, those signs are not required, please do not include these in your bid.

7. Question: It appears that Note 4 (about residual current detection} Note 5 (max number of stations downstream of an RCD) and Note 7 (about type 2 surge protection from IEC reference) on Sheet El all come from ChargePoint's European spec sheets. Are these required for this project?
Answer: No, these provisions are not required for this project, please ignore notes 4, 5, and 7 on Sheet El. See below for updated El notes:

1. iNSTA_, C 1-·ARGING ST.ATICf\JS ;::,EK MAN§AC I UF\c-"'. R::c OMMLN0ATIONS, INS_A __ AT 1-:)N NS-R1.1c-10f\b, c:=-c 2022, ME'! .A,i s-AL .A\JJ l8CAL BUI'._] NG CODc:S.

2. RECOMMUD CH/iRGEP'.JI\JI CHAKGlf\JG Sit! ()\JS R AP 0 RCVEJ ~8UIVALENT).

St:~ S;'::: S0 :~:: r C: ~ ·;:_ ::,: ·:._::_ -s =-cR .::, 0 :::::.,: .- ~ : -:.ARC \JG s-.A: O\J vlODELS.

3. EV CHARGERS AR:. ro B:: TV:):_ , , L::v::L 2 CHARGERS.

0. 7
A D::JICA7 C:0:: R::11-: .3ri/: •. __ R-C HARGER ( EC si:::6 1 7 7 2:). ,_ISED
6:-v1." ~DC JD (IEC 6G3H
'.:rl.6'._'._ a:: :::a 1_11° 0 =-:' ',,',/LJ /\\j EARTl: 1\JC RQJ 11.i'l? :?::: :.::<? 1_11::::>'.JED 1/"~'. 1 l 6 :voe:
2 ::' 1JRG::- ::ip0r=-c-,v;- 9r:\11-;;::-, 1 '1s·r!l'._'.._::_~l I f")I'•[) .:Y)L f;b' ,we- ~J" 1" z:::f;?'•JIGL ~ =-: 6~~6/ ,• 7 22;.

8. A MEANS OF ) SCONNLC- INSTALL::D IN ,4 ~::AJ L':" ACCESS,BL:: LOCATION w.Tr--W\J FYES Cf -- T- .,.:--E c i 1t-.RG1~JG s-.A: 'J\JS ~~= ::-c G2S.L.3:).

9. EV C :-l ARCING C AB . ::- S M ...J ST \JOT EX C ::ED ; ::; ff r:-i· IN LL NG I H AND h AV C N 0 M!D-C OKD C ')1_p_ \JGS (C EC 625. 1 7) L,c\JD GE '.i:f- R1J)C :<' =:D --o J:=: -E\JERCIZE vVr-:EN .JN::i~ucG:.:.O ;.·ROM .A ,:l,1C,_:=: C~ .:.::J3v:C: ;-:::, 1C STR::'SS (C::C 625. 18).
'. 0. .A'._'._ C CNDUC 1 8RS A>-1:) C 'J\n I - ~A\/':.. 3 ::_ \J ::, Z:.J -'::: A:: C C;011\,1CDA-::: 19f<W C f--LA.RG NG s--4 ~ !C\~ S. C l~.A~C1 :,JG Si A.Tl '.J~.j ::_ :]JI :=i'vH i\J! H; BE sn Ci Fir'') 3 ':" LOCA1ICf\J.
106
I
PROJECT:

DATE:

MEETING LOCATION:

CONTRACTOR/PROPOSER

BUSINESS NAME
AC. C-SIGN-IN SHEET FOR PRE-BID CONFERENCE I
Installation of EV Charging Stations for RCEA Network-ARCATA & MCKINLEYVILLE August 28, 2024. Time Started: 9:00 am
1606 Pickett Rd, McKinleyvllle CA, 95519, Mad River Hospital, Arcata, Carlson Park, Arcata

CONTRACTOR

LICENSE NUMBER

ATTENDEE NAME
(Please Print)
PHONE
NUMBER

EMAIL ADDRESS
; ,c.· '-JI e,, '/AHOO con
1 107
-End of IFB-24-505 Addendum No.-1
108

REDWOOD COAST
Energy Authority
IFB-24-505 Addendum No.2:

Additional Information from RCEA:

Bidders shall be required to add the City of Arcata as "additionally insured" on all insurance policies covering the work at Carlson Park.

Questions from Bidders:

1. Question: Will we be using the specified bollards with plates from Grainger for McKinleyville and Carlson Park, as they will be placed on existing sidewalks, or will we be saw cutting and removing sections of sidewalk to pour the new base?
Answer: Bidders may use the "Bolt Down Option" from detail 7 "Bollard Detail" on sheet C1 for the McKinfeyville.

Bollards at Carlson Park are by others and should not be included in this bid.

2. Question : If we are using the surface mount bollard, this spec'd item is not rated for vehicle impact per t he supplier. Can you confirm this is still the one to use? Answer: Please use the "Bolt Down Option" from detail 7 "Bollard Detail" on sheet C1 per the existing plans.

3. Question: The Mad River Hospital location does not have adjacent existing asphalt. Does RCEA have specs for the base preparation and edge slope to existing gravel, similar to what there is for the sites with existing AC? There is a detail for this on Sheet C-1, Detail 2, but it is crossed out and marked "not used".

Answer: That is an error on the drawings. Detail 2, Sheet C1 is the correct callout. Detail 1 on Sheet 2.3 has the correct callout, but C1 is incorrect in having the "not used" label over this detail.

Bidders shall use Detail 2 on Sheet C1 for the base preparation and edge slope to existing gravel at Mad River Community Hospital.
www.redwoodenergy.org
633 3rd Street - Eureka, CA 95501
707.269. 1700 (local) - 800.931-RCEA (toll-free) - 707.269.1777 (fax) 109

4. Question: The Eaton panel board to be used in lieu of the Siemens is 3BR4242L400R for the 3- phase panel, and BR4242L400R for the single-phase panel. Can we get approval for those 2 items?
Answer: RCEA submitted the specs for these Eaton panels to PG&E for review and approval on September 3, 2024. PG&E has not responded as of September 13, 2024.

5. Compaction is spec'd in a couple places on the plans, for both trenches and under parking stalls.

Is compaction testing required on this project?
Answer: Compaction testing is not required for this project.

6. Question: Are the bollards required to be painted, and/or have reflective taping, applied? Answer:No
-End of IFB-24-505 Addendum No.-2
110
Hooven & Reese, Inc. /F"
HOOVEN & rmse 3445 Central Avenue
---z:# McKinleyville, CA 95519
License #1078205
DIR# PW-LR-1000859605

REDWOOD COAST ENERGY AUTHORITY
---
TIME \d::si:, PM
RECEIVED BY CJvvt ~u.s

INITIALS
~

RECEIVED
SEP l 7 LU~4
Re~ Ciat Energy Autherity
SEALED BID for the Installation of EV
Charging Stations for RCEA Charging
Network - ARCATA & MCKINLEYVILLE -
Attn: Mike Avcollie
1:00 PM
Redwood Coast Energy Authority
633 3rd Street
Eureka, CA 95501
111
SECTION 00 41 00 - BID FORM
TO: Redwood Coast Energy Authority
Installation of EV Charging Stations for RCEA Charging Network - ARCATA &

MCKINLEYVILLE
RCEA Project No. IFB-24-505
Name of Bidder:
(Note: Name must be exactly as it appears on Contractor's License.) Business Address:

Telephone Number:

Residence Address:

The work to be done shall be constructed in accordance with the Contract Documents and the General Prevailing Wage provisions as specified in the "Invitation To Bidders".

Bids are submitted for the entire work. The amount of "The Bid" for comparison purposes will be the determination of the apparent low bid as specified in Section 00 21 13, "Instructions to Bidders".

The Bidder shall set forth for the Base Bid and each Alternate, if any, in clearly legible figures, a written lump sum price and a numeric lump sum price.

In case of a discrepancy between the two notated prices, the written price shall prevail, unless, however, if the amount set forth in writing is ambiguous, unintelligible, or uncertain for any cause, or is omitted, then the amount set forth in the numeric column for the item shall prevail.

If this proposal shall be accepted and the undersigned fails to enter into the Contract and to give the bonds as required within ten ( 10) calendar days after the Bidder has received notice that the contract has been awarded, RCEA may, at its option, detennine that the Bidder has abandoned the Contract, and thereupon this bid and the acceptance thereof shall be null and void and the forfeiture of such security accompanying this bid shall be forfeited and become the property of RCEA.

The undersigned, as Bidder, declares that the only persons or parties interested in this bid as principals are those named therein; that the bid is submitted without collusion with any other person, firm, or corporation; that Bidder has carefully examined the location of the proposed work, the proposed form of contract, and the plans therein referred to; and proposes and agrees if this bid is accepted, that Bidder will contract with RCEA in the form of RCEA' s contract, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the material specified in the contract, in the manner and time therein prescribed, and according to the requirements of the Owner's Engineer as therein set forth, and that he will take in full payment therefor the following item prices to wit:

RCEA2024
IFB-24-505

BID FORM
Section 00 41 00 - Page 1
112
Receipt and compliance with the following Addenda to the Contract Documents is acknowledged:

1. Addendum No._l _ Dated 08-l.1-2-4

2. Addendum No._l,_ Dated o't-13 - ').. '1

3. Addendum No. Dated --

4. Addendum No. Dated --

5. Addendum No. Dated --
I, ___ .z._A...__D ...... P:-~• 6=-Looc::-_-__.f__.f\~N'-"'b ...... \.l~\ ___________ _,,, as an agent for A , •• C • declare under penalty of perjwy under the laws of the State of California, that the infonnation contained in this Bid is true and correct.

Executed at -I Rt /\J , DA-o , California, on Cl')- I ~ ,2024 The project shall be complete within the time limits specified in Section 00 22 13, "Supplementary Instructions To Bidders." The undersigned is aware the Contract includes provisions for liquidated damages as specified in Section 00 2113, "Supplementary Instructions To Bidders," if the Project is not completed within the agreed time of completion.

THE UNDERSIGNED, as Bidder, proposes the following:

BASE BID:

To furnish and complete the entire work as shown on the drawings and listed in the specifications, including required contract, bonds, and insurance, without additions or subtractions on account of specified alternates, for the sum of:

Base Bid (Lump Sum):

Total Amount in Words
RCEA2024
IFB-24-505

BIDFORM
Section 00 41 00 - Page 2
113
PRICE BREAKDOWN:

RCEA will provide the new charging station equipment (dual-port ChargePoint CP6021 units) to be installed at each site, so those costs should be omitted from this bid.

Note the following details about civil work at each site:
• Civil work at the Azalea Hall/McKinleyville Library site and the Mad River Community Hospital site will include foundations, trenching, backfilling, concrete, paving, and striping associated with construction of parking stalls.
• Civil work at the Carlson Park site will be limited to charging station foundations, bollards and striping associated with designation of parking stalls. No new paving for parking stalls will be required at the Carlson Park site.

Note the following details about electrical work at each site:
• Electrical work at the Azalea Hall/McK.inleyville Library site and the Mad River Community Hospital site will include the meter panel, breakers, pull boxes, wire, conduit, and installation of the RCEA-provided charging stations.
• At the Carlson Park site, the meter socket and CT cabinet, disconnect and subpanel will be provided and installed by others and is not in scope for this contract. • Electrical work at the Carlson Park site will include breakers, conductors, and installation of RCEA-provided charging stations
Please provide information below to break out the civil and electrical work for easier evaluation.

Site Civil Cost Electrical Cost Total Site Cost
Azalea Hall/McKinleyville $ 3Ll I 8"10 ~ $32,~~~~ S(o7, 535~ Library site
Mad River Community Hospital $31 '3~D<?.9 $33i Z1-5~ s '71.., c, o!,' 9E. site I Carlson Park site J,'7,c;SS~ l, ~, D 16 9fJ. 4 f G, I C,'-}.S ~ Total Project Cost $ 2f(1 i'JS~ $ '7 1, °)&/ D '?..E- $ I E°G, I I 8S EE BID ALTERNATES:

None for this project

UNIT PRICES
For changing quantities of work items from those indicated on the contract drawings and specifications, upon written instructions from the Owner's Engineer, the following prices shall prevail:

I. None for this project
The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance etc., to cover the finished work of the several kinds called for. Changes shall be processed in accordance with the General Conditions.

RCEA2024
IFB-24-505

BIDFORM
Section 00 41 00 - Page 3
114
Proposal Signature Page
Accompanying this proposal is __ B_i O_1)_~ __ ? _ __,B,_____OJv'---l> _________ _ (Insert the words "Cash($)", "Cashier's Check", "Certified Check", or "Bidder's Bond", as the case may be) in the amount of at least ten percent ( 10%) of the total Bid Price submitted. The names of all persons interested in the foregoing proposal as Principals are as follows:
(NOTE: If a Bidder or other interested person is a Corporation, state the legal name of the c01poration, also names of the president, secretary, treasurer, and manager thereof; if a Co-partnership, state the true name of the firm, also state the names of all individual co-partners composing the firm; if the Bidder or other interested person is an Individual, state the first and last names in full.) Licensed in accordance with the Act providing for the registration of Contractors:

License No.: 't'1"1'1'1S B--; C-10 Expiration Date: I D- 3 I - 1-'t DIR Number: l O O I tf·i, 1-'1?
By my signature on this bid I certify, under penalty of perjury under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code Section 10162, and 10232, are true and correct and that the bidder has complied with the requirements of Section 8102 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2 of the California Administrative Code). By my signature on this bid I further certify, under penalty of perjury under the laws of the State of California and the United States of America, that the Non-Collusion Declaration required by Title 23 United States Code, Section 112, and Public Contract Code Section 7106; and the Title 49 Code of Federal Regulation, Part 29 Deoonll;~ML, d S:ion Jertification are true Md correct. _......,.O ___ Cj_-_l-=Ga--...... 2==L---f __ _ Signature of Bidder Date If a Bidder is a Corporation or a Co-partnership:

RCEA2024
IFB-24-505
Name of Corporation or Finn Name of Co-partnership

BID FORM
Section 00 41 00 - Page 4
115
Signatures of officer(s) or partners authorized to sign contracts on behalf of the Corporation or Co-partnership, Corporations require signature by 2 (two) corporate officers:

Name Title
Name Title
If Signature is by an agent, other than an officer of a corporation or a member of a partnership, a Power of Attorney must be on file with RCEA prior to opening Bids or may be submitted with the Bid; otherwise, the Bid will be disregarded as irregular and unauthorized.

RCEA2024
IFB-24-505
END OF SECTION 00 41 00

BID FORM
Section 00 41 00 - Page 5
116
Bond No. 67193563
SECTION 00 4313 -BID SECURITY FORM @ID BOND}
KNOW ALL PERSONS BY THESE PRESENTS:

We, the Contractor, ADRIBL TANSKI DBA AT C as principal (''Principal"), and WESTERN SURETY COMP ANY , a corporation, organized and existing under and by virtue of the laws of the State of SOUTH DAKOTA and authorized to do surety business in the State of California, as surety ("Surety'), are finnly bound unto the Redwood Coast Energy Authoricy (''RCEA"), State of California, as Obligee in the penal sum of Fifteen Thousand Eight Hundred apd 00/100 Dollars($ 15,800.00 }~ representing ten percent (10%) of the total amount of the bid of the Principal submitted to RCEA for the work described below for the payment of which sum in lawful money of the United States, we bind ourselves, our heirs, executors, administrators, successors, and assigns, )ointly and severally, firmly by this agreement
Whereas, the Principal has submitted the accompanying bid ("Bid") dated September 17, 2024 1 for the following project {''Project''):

Installation of EV Charging Stations for RCEA Charging Network-ARCATA &

MCKINLEYVILLE
RCEA Project No. IFB-24-505
THE CONDmON OF TillS OBLIGATION IS SUCH that whereas the Principal has submitted a bid to the Redwood Coast Energy Authority, State of California, for all work specifically descnoed in the accompanying bid;
NOW, THEREFORE, if the aforesaid Principal is awarded the contract, and within the time and manner required under the specifications, after the prescribed fonns are presented to Principal for signature, enters into a written contract in the prescribed form, in accordance with the bid, and files the two bonds, one guaranteeing faithful performance and the other guaranteeing payment for labor and materials as required by law, or if the said Principal shall fully reimburse and save harmless the Obligee from any damage sustained by the Obligee through failure of the Principal to enter into the written contract and to file the required performance and labor and material bonds, then this obligation shall be null and void; otherwise, it shall be and remain in :full force andeffect
In the event suit is brought upon this bond by the Obligee and judgment is recovered, the Surety shall pay all costs incurred by the Obligee in such suit, including a reasonable attorney's fee to be fixed by the Court.

In witness whereof the above-bound parties have executed this instrument under their several seals this 13th day of September , 2024, the name and corporate seal of each corporate Party being hereunder affixed, and these presents duly signed by its undersigned representative, pursuant to the authority of its governing body.

RCEA2024
IFB-24-505

BID SECURITY FORM (BID BOND)
Section 00 43 13 - Page 1
117
(Corporate Seal) AATC
Title: OWNER
(Corporate Seal)

WESTERN SURETY COMPANY
Surety
Attach Attomey-In-Fact Certificate
To be signed by Principal and Surety and Acknowledgment and Notary Seal to be attached RCEA2024
IFB-24-505
END OF SECTION 00 43 13

BID SECURITY FORM (BID BOND)
Section 00 43 13 - Page 2
118

ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.

State of California
County of Sacramento )
on September 13, 2024 before me, David M. Neeley, Notary Public (insert name and title of the officer)
personally appeared _J_a_co_b_E_lle_n ____________________ _ who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENAL TY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature (Seal)
DAVID M. "IEELEY
Notary Public • Cailfor,ia
Sacramento Count..,
Commission; 2389312
My Comm. Expires Jan 3. 2026
119
Western Surety Company

POWER OF ATTORNEY - CERTIFIED COPY
Bond No. 67193563
Know All Men By These Presents, that WESTERN SURETY COMPANY, a corporation ,duly organized and existing under the laws of the State of South Dakota, and having its principal office in Sioux Falls, South Dakota (the 11Company11), does by these presents make, constitute and appoint Jacob Michael Ellen
its true and lawful attomey(s)•in-fact, with full power and authority hereby conferred, to execute, acknowledge and deliver for and on its behalf as Surety, bonds for:

Principal: Adriel Tanski dba A T C
Obligee: Redwood Coast Energy Author! ty
Amount: $1,000,000 .. 00
and to bind the Company thereby as fully and to the same extent as if such bonds were signed by the Vice President, sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said attorney.(s)•in-fact may do within the above stated limitations. Said appointment is made under and by authority of the following bylaw of Western Surety Company which remains in full force and effect. 11Section 7. All bonds, policies, undertakings, Powers of Att.omey or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President or by such other officers as the Board of Directors may authorize. The President, any V-ice President, Secretary, any .Assisf.anl; S"ecretary, or the Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attomey or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." This Power of Att.orney may be signed by digital signature and sealed by a digital or otherwise electronic-formatted corporate seal under and by the authority of the following Resolution adopted by the Board of Directors of the Company by unanimous written consent dated the 27th day of April, 2022: 11RESOLVED: That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify and confirm the use of a digital or otherwise electronic-formatted corporate seal, each to be considered the act and deed of the Company.11
If Bond No. 671 93563 is not issued on or before midnight of December 16th, 2024 , all authoril"Q\\lfe~~ this Power of Attorney shall expire and terminate. ~~":-
~+' ~ttE T¥"''"'~
Surefy Company has caused tbeo~1'888Dts ID he sil!!l!ld by its v,... President, Lany Kasten, and Its r.n~~.aea!H§a • ...., • 17th day of SeptemQer , 2024 . 1f!To~~ _ ..,,.,~ ·i-os i:t\tJ ~j~J WES.TERN SURET COMPANY
~~~f ~JaA }ss co~t;u·a~ lij~::Jfl
On this 17th day of September , in the year 2024 , before me, a notary public, personally appeared Larry Kasten, who being to me duly sworn, acknowledged that be signed the above Power of Attorney as the aforesaid officer of ~ SURETYNO:= =~lodged said instrument ID he the voluntary act dsed ~ ~ ~ ~ Notary Public - South Dakota
•-',c,,ca1,c,c!~;'!~,~=~!:11,=,•s=,,.,.,i: My Commission Expires F-ebruary 12, 2027 I the undersigned officer of Western Surety Company, a stock corporation of the State of South Dakota, do hereby certify that the attached Power of Attomey is in full force and effect and is irrevociJ>~ and furthermore, that Section 7 of the bylaws of the Company as set forth in the Power of Attorney is now in force. ... ~.,....A. ....... y ~ ~ .... ;--·~-~ ....,..., .. ~
In testimony whereof, I have hereunto set my hancl~n,a)spa¼fWes~~ Company this 17th day of September 2024 J-.l ~ .,..::. .. ~~;.
:.,,..-= .::;, ........._ ':. ..... =
=-::: o~~ ~ST =~~ ~'=-~ ::.:= s.,~ c,,- ~~ ~-:::: ~ ~~ -D.., "'--1...: .:~ ~ ~ .-"' ,;;;, ... ~..,;--...:. ---- ~ ~~~--,, ~ ~ resident ~.... ..:/_f'~- .l..'...,. ~ ...

To validate bond authenticity, go to ~Q.\lvner/Obligee Services >Validate Bond· Coverage.

Form F5306-5-2D23
120
SECTION 00 43 36- SUBCONTRACTOR LIST
The Bidder shall list all Subcontractors in accordance with Article 18 of the Supplementary General Conditions.

Name of Subcontractor,
CA Contractor License and
DIR Number
.S. P, M,
Address
l 7G,52- 1-llR.~C~ c,
/?!JJ D ER.!.>o JJ., Cf:) 'f <eo6?
Description of Work
to be Perfonned
---············································-··············································································································-········································-·······-· RCEA2024
IFB-24-505
END OF SECTION 00 43 36

SUBCONTRACTOR LIST
Section 00 43 36 - Page I
121
SECTION 00 45 13 - BIDDER'S QUALIFICATIONS
Installation of EV Charging Stations for RCEA Charging Network - ARCATA &

MCKINLEYVILLE
RCEA Project No. IFB-24-505
TO THE BIDDER:

In making its award, the Board of Directors for RCEA will take into consideration the Bidder's experience, financial responsibility and capability. The following questionnaire is a part of the bid. Any bid received without this completed form may be rejected as nonresponsive. The Board will use, but will not be limited to, the information provided herein for evaluating the qualifications and responsibility of the Bidder and the Bidder's organization to carry out satisfactorily the terms of the Contract Document. The questionnaire must be filled out accurately and completely and submitted with the bid. Any errors, omissions or misrepresentation of information may be considered as a basis for the rejection of the bid and may be grounds for the termination of any contract executed as a result of the bid. Please fill in all questions or mark "not applicable."
A. Description of Bidder's Organization

1. Firm Name A••• C ----------------------- 2. Address P, 0, i3 OX 'l. J..S-5 nc::.1< IN t-.1:"I VII-LE1 c~ ";.!J-SIJ

3. Telephone Number ? p?- Lto/1-l..~ 18

4. Type of Organization
a. Corporation? Yes No ✓ If yes, list the officers and positions, and the State in which incorporated.

If th B' dd Nt(p.. b • d" • d dW' f • 1 er corporation 1s a su st 1ary, give name an a ess o parent corporation. b. Partnership? Yes __ No /
If yes, list partner names and addresses
General Partners:

Limited Partners:
c. Individual Proprietorship? Yes ✓ No
If yes, list name and address of proprietor:

RCEA2024
IFB-24-505
A \)R,f EL Tf\,N6KI

BIDDER'S QUALIFICATIONS
Section 00 45 13 - Page 3
122
B. Nature of Operations

1. How long have you been engaged in the contracting business under your present business name? t '-l "I Eh~ ~

2. How many years of experience does your business have in construction work similar to that called for under this bid? l'-1. YEert2....~

3. Have you now contracts, or have you ever contracted, to provide construction for any government agency or special district in the State of California? Yes__ No~ a. If ''yes," on a separate attached sheet, provide the following infonnation for all construction projects you have had with government agencies or special districts during the last four ( 4) years:
i. Year contract awarded
ii. Type of work
iii. Contract completion time called for/actual completion time iv. Contract price
v. For whom performed, including person to call for a reference and telephone number. vi. Location of work
vii. Number of stop notices file.
viii. For each contract, list any lawsuits filed relating to that contract in which you were a defendant or plaintiff.
ix. Amount of liquidated damages assessed.
b. On a separate attached sheet, provide the following infonnation for all construction contracts of a similar nature as called for in this bid that you have had with other entities during the last four (4) years:
i. Year contract awarded
ii. Type of work
iii. Contract completion time called for/actual completion time iv. Contract price
v. For whom perfonned, including person to call for reference and phone number vi. Location of work
vii. Number of stop notices filed
viii. For each contract list any lawsuits filed relating to that contract in which you were a defendant or plaintiff
ix. Amount of liquidated damages assessed.
c. For each construction contract that you have failed to complete within the contract time in the last four years please state the reasons for the untimely perfonnance.

C. Past Experience

1. If any of the business endeavors referred to above are no longer operating, or you are no longer associated with them, please give brief details:

RCEA2024
IFB-24-505

BIDDER'S QUALIFICATIONS
Section 00 45 13 - Page 4
123

2. The following surety companies may be contacted as references as to the financial responsibility and general reliability of the Bidder:

Surety Name
C!.c I.>
Contact Person
O~VU> NEELEY
Phone Number
'j/G,-3~3 r2.~G,3
I certify under penalty of perjwy of the laws of the State of California that the foregoing is true and correct.

Executed at Tf\W lb~)) , California, on Cfl-l~-2-4 , 2024.

Signature of Bidder
Name (print)
Company
RCEA2024
IFB-24-505
END OF SECTION 00 45 14

BIDDER'S QUALIFICATIONS
Section 00 45 13 - Page 5
124
RE: Similar Work
A.T.C.

BUILDING AND ELECTRICAL CONTRACTOR
PO BOX 2155 MCKINLEYVILLE, CA 95519
707-499-2618 [email protected]
LICENSE NUMBER 944965
September 16, 2024
A.TC. has not installed these exact commercial EV Chargers, but has performed many projects both electrical and site work/grading, including commercial electrical jobs, residential electrical, generator installations, concrete parking lots, grading, foundations, including new construction of commercial buildings.

A.TC. has not been issued stop notices, had lawsuits filed, been assessed liquidated damages, or failed to complete any projects.

Adriel Tanski
125
SECTION 00 45 19-NON-COLLUSION DECLARATION
The undersigned declares:

I am the bLOAJ E"J2..
bid.
the party making the foregoing
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other Bidder.

All statements contained in the bid are true. The Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed onffl-/ ,-2'·/ [date], at Tf\ w, D M) [city], C:N...1 fOW IP.

Signature of Bidder
Date: C> ~ - I"-2..'i
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

RCEA2024
IFB-24-505
END OF SECTION 00 45 19

NON-COLLUSION DECLARATION
Section 00 45 19 - Page 6
126
SECTION 00 4S 26-WORKERS' COMPENSATION CERTIFICATION STATEMENT Labor Code §3700 in relevant part provides:
"Every employer except the State shall secure the payment of compensation in one or more of the following ways:
( a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations a certificate of consent to self-insure, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his employees."
I am aware of the provisions of §3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the perfonnance of the work of this Contract and will require all Subcontract to do the same.

Signature of Contractor
In accordance with Article 5 ( commencing at § 1860), Chapter 1, Part 7, Division 2 of the Labor Code, the above certificate must be signed and filed with the awarding body prior to performing any work under this Contract.

RCEA2024
IFB-24-505
END OF SECTION 00 45 26

WORKERS' COMPENSATION CERTIFICATION STATEMENT
Section 00 45 26 - Page 1
127
SECTION 00 45 48-DEBARMENT AND SUSPENSION CERTIFICATION TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The CONTRACTOR, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:

1. is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal, State, or local agency;

2. has not been suspended, debarred, voluntarily excluded, or determined ineligible by any Federal, State, or local agency within the past 3 years;

3. does not have a proposed debarment pending; and

4. has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

Exceptions will not necessarily result in denial of award but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

NOTE: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Certification.

Signature of Contractor
Date: C>Cf- I Ce,- ~'1
RCEA2022
IFB-24-505
END OF SECTION 00 45 48

DEBARMENT AND SUSPENSION CERTIFICATION
Section 00 45 48 - Page
128
I
B \\) ~(.)\'l... T l-\'E l,N !.'T1>.'\.,t..)>.-,l()/J Of· 6 \) C-HP.R~l)..l(.. ..S~Tll)}J!, - Pvt.le!'liA l'WJ) MC.l.i,IIJ<..l?f Vlt.LE ,.

RECEIVED
SEP 1 7 2024

REDWOOD COAST ENERGY AUTHORITY
-
- -
TIME \l:Cl N1
RECEIVED BY ('l,,A/vl ~ ~ l,l,EES
INITIALS G(JZ._ --
129
SECTION 00 41 00 - BID FORM
TO: Redwood Coast Energy Authority
Installation of EV Charging Stations for RCEA Charging Network-ARCATA &

MCKINLEYVILLE
RCEA Project No. IFB-24-505
Name of Bidder:

Business Address:

Telephone Number:

Residence Address:

Adams Commercial General Contracting, Inc.
(Note: Name must be exactly as it appears on Contractor's License.) 339 2nd Street, Eureka, CA 95501
707-443-6000
Arcata, CA
The work to be done shall be constructed in accordance with the Contract Documents and the General Prevailing Wage provisions as specified in the "Invitation To Bidders".

Bids are submitted for the entire work. The amount of "The Bid" for comparison purposes will be the determination of the apparent low bid as specified in Section 00 21 13, "Instructions to Bidders".

The Bidder shall set forth for the Base Bid and each Alternate, if any, in clearly legible figures, a written lump sum price and a numeric lump sum price.

In case of a discrepancy between the two notated prices, the written price shall prevail, unless, however, if the amount set forth in writing is ambiguous, unintelligible, or uncertain for any cause, or is omitted, then the amount set forth in the numeric column for the item shall prevail.

If this proposal shall be accepted and the undersigned fails to enter into the Contract and to give the bonds as required within ten ( 10) calendar days after the Bidder has received notice that the contract has been awarded, RCEA may, at its option, determine that the Bidder has abandoned the Contract, and thereupon this bid and the acceptance thereof shall be null and void and the forfeiture of such security accompanying this bid shall be forfeited and become the property of RCEA.

The undersigned, as Bidder, declares that the only persons or parties interested in this bid as principals are those named therein; that the bid is submitted without collusion with any other person, firm, or corporation; that Bidder has carefully examined the location of the proposed work, the proposed form of contract, and the plans therein referred to; and proposes and agrees if this bid is accepted, that Bidder will contract with RCEA in the form of RCEA 's contract, to provide al I necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the material specified in the contract, in the manner and time therein RCEA2024
IFB-24-505

BID FORM
Section 00 41 00 - Page I
130
J
prescribed, and according to the requirements of the Owner's Engineer as therein set forth, and that he will take in full payment therefor the following item prices to wit:

Receipt and compliance with the following Addenda to the Contract Documents is acknowledged:

I. Addendum No. 1 Dated 8/29/2024 --

2. Addendum No. 2 Dated 9/13/2024 --

3. Addendum No. Dated --

4. Addendum No. Dated --

5. Addendum No. Dated --
I, WillAdams as an agent for
Adams Commercial General Contracting, Inc. declare under penalty of perjury under the laws of the State of California, that the information contained in this Bid is true and correct.

Executed at __ E_u_re_k_a ____ _, California, on September 17 2024 The project shall be complete within the time limits specified in Section 00 22 13, "Supplementary Instructions To Bidders." The undersigned is aware the Contract includes provisions for liquidated damages as specified in Section 00 21 13, "Supplementary Instructions To Bidders," if the Project is not completed within the agreed time of completion.

THE UNDERSIGNED, as Bidder, proposes the following:

BASE BID:

To furnish and complete the entire work as shown on the drawings and listed in the specifications, including required contract, bonds, and insurance, without additions or subtractions on account of specified alternates, for the sum of:

Base Bid (Lump Sum):

One Hundred Sixty-Five Thousand,
Eight Hundred Forty-Six Dollars
Total Amount in Words
RCEA 2024
IFB-24-505
$ 165,846
Total

BID FORM
Section 00 41 00 - Page 2
131
PRICE BREAKDOWN:

RCEA will provide the new charging station equipment (dual-port ChargePoint CP602 I units) to be installed at each site, so those costs should be omitted from this bid.

Note the following details about civil work at each site:
• Civil work at the Azalea Hall/McKinleyville Library site and the Mad River Community Hospital site will include foundations, trenching, backfilling, concrete, paving, and striping associated with construction of parking stalls.
• Civi l work at the Carlson Park site will be limited to marking/designating parking stalls as "EV Charging Only"' and installation of two (2) wheel stops. Wheel stops shall be: Rubberform Wheel Stop RF-RBR I 4HDG. eharging station foundations, bollards and striping assoeiated with designation of parldng stalls. No new paving for parking stalls will be required at the Carlson Park site.

Note the following details about electrical work at each site:
• Electrical work at the Azalea Hall/McKinleyville Library site and the Mad River Community Hospital site wi ll include the meter panel, breakers, pull boxes, wire, conduit, and installation of the RCEA-provided charging stations.
• At the Carlson Park site, the meter socket and CT cabinet, disconnect and subpanel will be provided and installed by others and is not in scope for this contract. • Electrical work at the Carlson Park site will be limited to providing and installing EV circuit conductors (in conduit by others), breakers for EV circuits (in sub-panel by others), and installation and activation of EV Charging Stations (Stations provided by others, charging station foundations provided by others). inelude breakers, eonduetors, and installation of RCEA pro¥ided eharging stations
Please provide information below to break out the civil and electrical work for easier evaluation.

Site
Azalea Hall/McKinleyville
Library site
Mad River Community Hospital
site
Carlson Park site
Total Project Cost
BID ALTERNATES:

None for this project

UNIT PRICES
RCEA 2024
IFB-24-505
Civil Cost
$ 39,980
$ 38,618
$2,580
$ 81 ,178
Electrical Cost
$ 32,400
$ 33,108
$ 19,160
$ 84,668
Total Site Cost
$
$
$
$
72,380
71,726
21 ,740
165,846

BID FORM
Section 00 4 1 00 - Page 3
132
For changing quantities of work items from those indicated on the contract drawings and specifications, upon written instructions from the Owner's Engineer, the following prices shall prevail:

I. None for this project
The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance etc., to cover the finished work of the several kinds called for. Changes shall be processed in accordance with the General Conditions.

Proposal Signature Page
Accompanying this proposal is _ B_id_d_e_r'_s_B_o_n_d ________________ _ (Insert the words "Cash($)", "Cashier's Check", "Certified Check", or "Bidder's Bond", as the case may be) in the amount of at least ten percent ( I 0%) of the total Bid Price submitted. The names of all persons interested in the foregoing proposal as Principals are as follows:

Will Adams, President
(NOTE: lfa Bidder or other interested person is a Corporation, state the legal name of the corporation, also names of the president, secretary, treasurer, and manager thereof; if a Co-partnership, state the true name of the tinn, also state the names of all individual co-partners composing the tinn; if the Bidder or other interested person is an Individual, state the first and last names in full.) L icensed in accordance with the Act providing for the registration of Contractors:

L icense No.: 875823 Expiration Date: _ 2_/2_8_/2_0_2_6 ____ _ DIR Number: 1000000607
By my signature on this bid I certify, under penalty of perjury under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code Section I O 162, and I 0232, are true and correct and that the bidder has complied with the requirements of Section 8102 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2 of the California Administrative Code). By my signature on this bid J further certify, under penalty of perjury under the laws of the State of California and the United States of America, that the Non-Collusion Declaration required by Title 23 United States Code, Section 11 2, and Public Contract Code Section 7106; and the Title 49 Code of Federal Regulation, Part 29 Debannent and Suspension Certification are true and correct. 9/17/2024
Signature 6t' Bidder Date
If a Bidder is a Corporation or a Co-partnership:

Adams Commercial General Contracting, Inc.

Name of Corporation or Finn Name of Co-partnership
RCEA 2024
IFB-24-505

BID FORM
Section 00 41 00 - Page 4
133
Signatures of officer(s) or partners authorized to sign contracts on behalf of the Corporation or Co-partnership, Corporations require signature by 2 (two) corporate office rs:

Name
President
Title
Secretary
Title
If Signature is by an agent, other than an officer of a corporation or a member of a partnership, a Power of Attorney must be on file with RCEA prior to opening Bids or may be submitted with the Bid; otherwise, the Bid will be disregarded as irregular and unauthorized.

RCEA 2024
IFB-24-505
END OF SECTION 00 41 00

BID FORM
Section 00 4 1 00 - Page 5
134
#164
SECTION 00 43 13 - BID SECURITY FORM (BID BOND}
KNOW ALL PERSONS BY THESE PRESENTS:

We, the Contractor, Adams Commercial General Contracting, Inc. as principal (""Principal"), and Travelers Casualty and Surety Company of America , a corporation, organized and existing under and by virtue of the laws of the State of Connecticut and authorized to do surety business in the State of California. as surety ('"Surety"), are firmly bound unto the Redwood Coast Energy Authority (''RCEA''), State of California, as Obligee in the penal sum of_T_e_n_P_e_rc_e_n_t _______ _ Dollars ($ 10% ), representing ten percent ( 10%) of the total amount of the bid of the Principal submitted to RCEA for the work described below for the payment of which sum in lawful money of the United States, we bind ourselves, our heirs, executors, administrators. successors, and assigns, jointly and severally, firmly by this agreement.

Whereas, the Principal has submitted the accompanying bid ('"Bid") dated _0_9_/1_7_/2_4 _____ _, for the following project ("Project"):

Installation of EV Charging Stations for RCEA Charging Network - ARCATA &

MCKINLEYVILLE
RCEA Project No. IFB-24-505
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted a bid to the Redwood Coast Energy Authority, State of California, for all work specifically described in the accompanying bid;
NOW, THEREFORE, if the aforesaid Principal is awarded the contract, and within the time and manner required under the specifications, after the prescribed forms are presented to Principal for signature, enters into a written contract in the prescribed form, in accordance with the bid, and files the two bonds, one guaranteeing faithful performance and the other guaranteeing payment for labor and materials as required by law, or if the said Principal shall fully reimburse and save harmless the Obligee from any damage sustained by the Obligee through failure of the Principal to enter into the written contract and to file the required performance and labor and material bonds, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

In the event suit is brought upon this bond by the Obligee and judgment is recovered, the Surety shall pay all costs incurred by the Obligee in such suit, including a reasonable attorney's fee to be fixed by the Court.

In witness whereof the above-bound parties have executed this instrument under their several seals this 11th day of September , 2024, the name and corporate seal of each corporate Party being hereunder affixed, and these presents duly signed by its undersigned representative, pursuant to the authority of its governing body.

RCEA 2024
IFB-24-505

BID SECURITY FORM (BID BOND)
Section 00 43 13 - Page 1
135
.,
(Corporate Seal)
Attach Attorney-In-Fact Ce11ificate
Adams Commercial General Contracting, Inc.

By ____
Title: President
(Corporate Seal)
Travelers Casualty and Surety Company of America
Surety
By
Attorney-in-Fact \ ~ Title
To be signed hy Principal and Surety and Acknowledgment and Notmy Seal to he al/ached.

RCEA 2024
IFB-24-505
END OF SECTION 00 43 13

BID SECURITY FORM (BID BOND)
Section 00 43 13 - Page 2
136
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness. accuracy, or validity of that document.

State of California
County of Sacramento
On C?{ ✓ ]l-')d)
Date i
J . Swalley, notary public before me, ______________________ _ Here Insert Name and Title of the Officer
personally appeared _______ s_h_i_r_le_y_a_au_g_h ____________________ _ Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. ~ dlt OA\12: ft tllhdlM3> 4>: elhA:,7
.,'-"~ _-:?~ ~.., J. SWALLEY
~'- Nota:-y Public · California
j ~~< ~~? Sac'.~mento County ! ~ ,, .;- Comm1sston :; 2424922 L::.:::!Y z:m.z· !:P~:_::3o. :026.

Place Notary Seal Above
I certify under PENAL TY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.
----------------OPTIONAL----------------
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: _____________________________ _ Document Date: ____________________ Number of Pages: _____ _ Signer(s) Other Than Named Above: _______________________ _ Capacity(ies) Claimed by Signer(s)
Signer's Name: ____________ _ Signer's Name: ____________ _ - Corporate Officer - Title(s): ______ _ - Corporate Officer - Title(s): ______ _ _ Partner - = Limited = General Partner - = Limited = General _ Individual = Attorney in Fact Individual -:: Attorney in Fact Trustee = Guardian or Conservator ,.... Trustee := Guardian or Conservator - Other: _______________ _ - Other: ______________ _
Signer Is Representing: _________ _ Signer Is Representing: _________ _ ©2016 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 137
. '
..... TRAVELERS J
Travelers Casualty and Surety Company of America
Travelers Casualty and Surety Company
St. Paul Fire and Marine Insurance Company

POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint Shirley Baugh of SACRAMENTO , California , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.

IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021.

State of Connecticut
City of Hartford ss.

On this the 21 st day of April, 2021 , before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do. executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer.

IN WITNESS WHEREOF, I hereunto set my hand and official seal.

My Commission expires the 30th day of June, 2026
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows:

RESOLVED, that the Chairman, the President. any Vice Chairman. any Executive Vice President. any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her: and it is FURTHER RESOLVED, that the Chairman. the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance. contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President. any Senior Vice President or any Vice President, any Second Vice President. the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President. any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached.

I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect.

Dated this 11th day of September , 2024
I, Kevin E. Hughes, Assistant Secretary
To ver17y the authenticity of this Power of Attorney, please call us at 1-800-421-3880.

Please refer to the above-named Attorney{s)-in-Fact and the details of the bond to which this Power of Attorney is attached. 138
SECTION 00 43 36 - SUBCONTRACTOR LIST
The Bidder shall list all Subcontractors in accordance with Article 18 of the Supplementary General Conditions.

Name of Subcontractor,
CA Contractor License and
DIR Number
Foster Striping
Lie. 912183
DIR 1000053402
RCEA2024
IFB-24-505
Address
730 Herrick Avenue
Eureka, CA 95503
END OF SECTION 00 43 36
Description of Work
to be Performed
Pavement Marking

SUBCONTRACTOR LIST
Section 00 43 36 - Page 1
139
.L
SECTION 00 4513-BIDDER'S QUALIFICATIONS
Installation of EV Charging Stations for RCEA Charging Network - ARCATA &

MCKINLEYVILLE
RCEA Project No. IFB-24-505
TO THE BIDDER:

In making its award, the Board of Directors for RCEA will take into consideration the Bidder's experience, financia] responsibility and capability. The following questionnaire is a part of the bid. Any bid received without this comp1eted form may be rejected as nonresponsive. The Board will use, but will not be limited to, the information provided herein for evaluating the qualifications and responsibility of the Bidder and the Bidder's organization to carry out satisfactorily the terms of the Contract Document. The questionnaire must be filled out accurately and completely and submitted with the bid. Any errors, omissions or misrepresentation of information may be considered as a basis for the rejection of the bid and may be grounds for the termination of any contract executed as a result of the bid. Please fill in all questions or mark "not applicable."
A. Description of Bidder's Organization

1. Firm Name Adams Commercial General Contracting, Inc.

2. Address 339 2nd Street, Eureka, CA 95501

3. Telephone Number ..;..7.;::;..07'--4--'-4...;..3;;:;...-6..;;;;..0=0;;;..;;0;;...._ _____________ _

4. Type of Organization
a. Corporation? Yes~ No __
If yes, list the officers and positions, and the State in which incorporated.

Will Adams, President, California
If the Bidder corporation is a subsidiary, give name and address of parent corporation. n/a
b. Partnership? Yes __ No .1,.

If yes, list partner names and addresses
General Partners:

Limited Partners:
c. Individual Proprietorship? Yes
RCEA 2024
IFB-24-505
If yes, list name and address of proprietor:

Noy_

BIDDER'S QUALIFICATIONS
Section 00 45 13 - Page 3
140
.. __-
B. Nature of Operations

1. How long have you been engaged in the contracting business under your present business name? 13 years

2. How many years of experience does your business have in construction work similar to that called for under this bid? _2_1 ____ _

3. Have you now contracts, or have you ever contracted, to irovide construction for any government agency or special district in the State of California? Yes x.._ No __ a. If "yes," on a separate attached sheet, provide the following information for all construction projects you have had with government agencies or special districts during the last four (4) years:
i. Year contract awarded
ii. Type of work
iii. Contract completion time called for/actual completion time iv. Contract price
v. For whom performed, including person to call for a reference and telephone number. vi. Location of work
vii. Number of stop notices file.
viii. For each contract, list any lawsuits filed relating to that contract in which you were a defendant or plaintiff.
ix. Amount of liquidated damages assessed.
b. On a separate attached sheet, provide the following information for all construction contracts of a similar nature as called for in this bid that you have had with other entities during the last four (4) years:
i. Year contract awarded
ii. Type of work
iii. Contract completion time called for/actual completion time iv. Contract price
v. For whom performed, including person to call for reference and phone number vi. Location of work
vii. Number of stop notices filed
viii. For each contract list any lawsuits filed relating to that contract in which you were a defendant or plaintiff
ix. Amount of liquidated damages assessed.
c. For each construction contract that you have failed to complete within the contract time in the last four years please state the reasons for the untimely performance.

C. Past Experience

1. If any of the business endeavors referred to above are no longer operating, or you are no longer associated with them, please give brief details:

RCEA2024
IFB-24-505
n/a

BIDDER'S QUALIFICATIONS
Section 00 45 13 - Page 4
141

2. The following surety companies may be contacted as references as to the financial responsibility and general reliability of the Bidder:

Surety Name Contact Person Phone N umber
Travelers Casualty & Surety Company of America
Contact: JoBeth Swalley of Valley Surety Insurance Agency Phone: 916-567-6676
I certify under penalty of perjury of the laws of the State of California that the foregoing is true and correct.

Executed at Eure~a , California, on September 17 , 2024.

Signature of Bidder
Name (print)
Company
RCEA 2024
TFB-24-505
;;,
Will Adams
Adams Commercial General Contracting, Inc.

END OF SECTION 00 45 14
BIDDER'S QUALi FICA TIONS
Section 00 45 13 - Page 5
142
SECTION 00 45 19 - NON-COLLUSION DECLARATION
The undersigned declares:

I am the President
bid.

Adams Commercial General
of Contracting, Inc. , the party making the foregoing
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organi zation, or corporation. The bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other Bidder.

All statements contained in the bid are true. The Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, thi s declaration on behal f of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 9/17/2024 [date], at Eureka [city], California ___ [state].

Signature '6f Bidder
Date: 9/17/2024
Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

RCEA 2024
IFB-24-505
END OF SECTION 00 45 19

NON-COLLUSION DECLARATION
Section 00 45 19 - Page 6
143
SECTION 00 45 26-WORKERS' COMPENSATION CERTIFICATION STATEMENT Labor Code §3700 in relevant par1 provides:
"Every employer except the State shall secure the payment of compensation in one or more of the following ways:
(a) By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this State. (b) By securing from the Director of Industrial Relations a certificate of consent to self-insure, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his employees."
I am aware of the provisions of §3700 o f the Labor Code which require every employer to be insured against liability for workers' compensation or to unde11ake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract and will require all Subcontractors to do the same.

Signature of Contractor
Date: 9/1 7/2024
In accordance with Article 5 (commencing at § I 860), Chapter I, Part 7, Division 2 of the Labor Code, the above certificate must be signed and fi led with the awarding body prior to performing any work under this Contract.

RCEA 2024
IFB-24-505
END OF SECTION 00 45 26

WORKERS' COMPENSATION CERTIFICATION STATEMENT
Section 00 45 26 - Page I
144
SECTION 00 45 48 - DEBARMENT AND SUSPENSION CERTIFICATION TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
The CONTRACTOR, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:

I. is not currently under suspension, debarment, voluntary exclusion, or dete1mination of ineligibility by any Federal, State, or loca l agency;

2. has not been suspended, debarred, voluntarily excluded, or determined ineligible by any Federal, State, or local agency within the past 3 years;

3. does not have a proposed debarment pending; and

4. has not been indicted, convicted, or had a c ivil judgment rendered against it by a court of competent jurisdiction in any matter invol ving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

Exceptions will not necessarily result in denial of award but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

NOTE: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing this Proposal on the signature pottion thereof shall also constitute signature of this Certification.

Signature tr Contractor
Date: 9/17/2024
RCEA 2022
IFB-24-505
END OF SECTION 00 45 48

DEBARMENT AND SUSPENSION CERTIFICATION
Section 00 45 48 - Page 1
145
... ,
ADAMS COMMERCIAL GENERAL CONTRACTING, INC.

CONTRACT REFERENCES II
!PROJECT VALUE OWNER ARCHITECT %COMPLETE COMPLETION DATE Newburg Glen Apartments $ 4,680,110 Newburg Glen, LLC Mcsorley Arcitecture 0% 12/31/2025 Humbodlt County Courthouse Reroof $ 1,632,531 County of Humboldt Public Works Mcsorley Architecture 90% 8/30/2024 Fred Endert Municipal Swimming Pool HVAC $ 1,172,729 City of Crescent City Public Works Aecom 5% 2/1/2025 County of Humboldt DA's Office Flooring Replacement $ 350,802 County of Humboldt Administrative Office Nichols, Melburg & Rossetto 5% 10/10/2024 Cal Poly Humboldt BSS/KA Boiler Replacements $ 655,880 Cal Poly Humboldt Cal Poly Humboldt 95% 8/10/2024 Buhne Street Townhomes $ 612,400 Humboldt Development Company ORY Drafting and Design 5% 6/1/2025 Alt. & New Bldgs at Albee Stadium & Bud Cloney Field $ 26,283,330 Eureka City Schools FF&J Architects, Inc. 12% 3/1/2026 Arcata High School Restrooms Remodel $ 1,100,261 Northem Humboldt Union School District Nichols, Melburg & Rossetto 65% 10/1/2024 339 2nd Street Mixed Use Building $ 4,162,370 Northern Humboldt Development company, LLC Mcsorley Architecture 100% 3/1/2024 217 E Street Tenant Improvement $ 124,000 Provisor Investments Design/Build 0% 11/1/2024 Alterations to Building Cat Eureka High School $ 9,979,680 Eureka Qty Schools FF&J Architects, Inc. 99% 8/1S/2024 Rohnerville Fire Station $ 2,768,046 Fortuna Fire Protection District CleekCo Drafting & Design 100% 7/20/2024 Ridgewood Elem. School Modernization, Ph. 1 $ 1,161,180 Cutten Elementary School District StudioW Architects 100% 3/30/2024 Scotia Baseball Field Accessibility Improvements $ 213,434 Scotia Community Servies District Whitchurch Engineering, Inc. 100% 4/15/2024 Petaluma Veterans Bldg. Seismic & Reroof $ 1,992,410 County of Sonoma Dept. of Public Infrastructure nerney/Figueiredo Architects 100% 12/27/2023 Early Head Start & Head Start Classrooms $ 1,583,246 Northcoast Children's Services K. Boodjeh Architects 65% 9/1/2024 Humboldt County Probation Bldg. Fire Reconstruction $ 267,014 County of Humboldt Public Works Nichols, Melburg & Rossetto 100% 3/20/2024 City of Clearlake City Hall Interior Remodel $ 1,359,679 City of Clearlake StudioW Architects 100% 3/10/2024 Humboldt County Auditor/Controller Office $ 709,640 Couny of Humboldt Administrative Office Nichols, Melburg & Rossetto 100% 7/15/2024 Clark Complex ADA Modification Project $ 346,012 County of Humboldt Administrative Office Brokaw Design 100% 1/31/2024 City of Eureka Coast Guard Building $ 278,841 City of Eureka Publlc Works Department Whitchurch Engineering, Inc. 100% 1/19/2024 Courthouse 4th Street ADA Modification Project $ 514,068 County of Humboldt Administrative Office Nichols, Melburg & Rossetto 100% 3/1S/2024 Courthouse ADA Improvements (Restrooms) $ 2,185,849 County of Humboldt Administrative Office Nichols, Melburg & Rossetto 88% 11/10/2024 Cal Poly Humboldt Library Flat Roof Replacement $ 1,709,458 California State University Board ofTrustees Suarez-Kuehne Architecture 100% 1/31/2024 Humboldt County Jail Exercise Room $ 59,474 County of Humboldt Public Works County of Humboldt Public Works 100% 6/23/2023 Valley East Lofts $ 3,286,470 Northern Humboldt Property Development, LLC Julian Berg Designs 70% 8/1/2024 Arcata House Partnership 2 Motel Remodel $ 415,000 Arcata House Partnership Design/Build 100% 4/1/2024 MacKerricher State Park Accessibllity Upgrades $ 4,308,236 California State Dept. of Parks & Recreation CA State Dept. of Parks & Recreation 77% 11/30/2024 El Pueblo Market $ 2,186,312 Engelberto Tejada Whitchurch Engineering, Inc. 90% 8/30/2024 Scotia Museum ADA Upgrades & HVAC $ 307,212 Scotia Community Servies District Whitchurch Engineering, Inc. 100% 11/1S/2023 Homekey Transitional Housing $ 1,039,517 Arcata House Partnership Design/Build 100% 3/1/2022 Arcata Gardens Apartment Remodel, Phase II $ 206,459 Humboldt Bay Housing Development Corporation Trinity Valley Consulting Engineers, Inc. 100% 2/3/2023 Anderson Valley High School HVAC Replacement $ 486,283 Anderson Valley Unified School District Alameida Architecture 100% 12/21/2022 Old Town Eureka Commercial & Residential Dev. $ 4,436,230 Northern Humboldt Property Development, LLC Mcsorley Architecture 100% 2/15/2024 Houda Point Accessibility Trail $ 81,072 Trinidad Coastal Land Trust K. Boodjeh Architects 100% 7/20/2022 Smith Lane, Fortuna Apartments $ 4,363,554 Adams Development Company, LLC JMB Architecture 100% 3/2022 Parents & Friends Residential Care Facility $ 2,903,613 Parents & Friends, Inc. K. Boodjeh Architects 100% S/12/2023 Humboldt County Jail Accessibility Improvements $ 1,211,867 County of Humboldt Administrative Office Nichols, Melburg & Rossetto 100% 5/31/2023 Correctional Facility Safety Netting $ 112,20S County of Humboldt Public Works LOA Partners, Inc. 100% 5/31/2023 Davenport Essential Oils Tenant Improvement $ 1,032,256 Davenport Essential Oils CleekCo Drafting & Design 100% 12/31/2023 Cutten Elementary School Modernization $ 1,525,826 Cutten Elementary School District StudioW Architects 100% 8/1/2023 Lutheran Home for the Aging 4-Plexes $ 1,809,696 Lutheran Home for the Aging Clare Freeman Residential Design 100% 10/8/2023 Tish Non Townhomes $ 1,747,109 Bear River Band of the Rohnervllle Rancheria Trinity Valley Consulting Engineers, Inc. 100% S/2023 Human Services Building $ 1,037,631 Hoopa Valley Tribe Design/Build 100% 2/3/2023 Murphy's Market Warehouse $ 244,466 Patrick Murphy Design/Build 100% 1/10/2024 Coast Guard Medical Clinic Reconfigure $ 1,305,319 US Coast Guard US Coast Guard avil Engineering Unit Oakland 100% 11/3/2023 146
\.,
STHS Tenant Improvement $ 3,312,701 Southern Trinity Health Services CleekCo Drafting & Design 100% 12/1/2022 Garberville DHHS ADA Modifications $ 187,950 County of Humboldt Administrative Office Alameida Architecture 100% 12/13/2022 Ill Sunset Hall Roof Replacement $ 822,308 Cal Poly Humboldt Suarez-Kuehne Architecture 100% 11/16/2022 Eureka Pet Cremation Remodel $ 147,658 Eureka Pet Cremation Design/Build 100% 8/20/2022 Arena Elementary Roof/Ceiling Replacement $ 179,651 Arena Union Elementary School District Alameida Architecture 100% 7/15/2022 Veterans Services ADA Modifications $ 67,150 County of Mendocino General Services Department Brokaw Design 100% 6/10/2022 Mental Health Water Damage $ 21,008 Mendocino County Executive Office Mendocino County Executive Office, Facilities & Fleet Div 100% 4/6/2022 Trinidad Grading/Erosion Control $ 133,161 Trinidad Rancheria Trinity Valley Consulting Engineers, Inc. 100% 3/30/2022 Willits Fire Station $ 5,831,915 Little Lake Fire Protection District calpo Hom & Dong Architects 100% 2/23/2022 Bear River Casino Poker Room $ 635,808 Bear River Casino Resort Design/Build 100% 1/31/2022 Regional Behavioral Health Training Center $ 308,482 County of Mendocino Executive Office Schlosser, Newberger Architects 100% 11/19/2021 Trinidad Rancherla Victim Services $ 548,501 Trinidad Rancheria Trinity Valley Consulting Engineers, Inc. 100% 10/2021 Garberville Mini Complex $ 2,428,303 County of Humboldt County Administrative Office Sally Swanson Architects 100% 10/2021 Ambrosini Elementary Mod $ 246,270 Fortuna Elementary School District BCA Architects 100% 9/15/2021 Tish Non Multifamily $ 2,153,258 Bear River Band of the Rohnerville Rancheria CleekCo Drafting & Design 100% 8/16/2021 Big Blue Cafe $ 482,278 Slack Family, LLC Heartwood Design/Build 100% 7/31/2021 Cher-AE Heights Slope Stabilization $ 402,587 Trinidad Rancherla Trinity Valley Consulting Engineers, Inc. 100% 6/7/2021 Arcata Gardens Apartment Remodel, Phase I $ 1,153,246 Humboldt Bay Housing Development Corporation Philippe Lapotre Architect 100% 5/27/2021 Homekey Transitional Housing $ 1,195,832 County of Mendocino Executive Office Brokaw Design 100% 5/24/2021 CCCU ATM Upgrades $ 280,394 Coast Central Credit Union McSorley Architecture 100% 2/15/2021 Pacific Union School District Classroom Addition $ 1,602,686 Pacific Union School District Siskiyou Design Group 100% 12/30/2020 Trinidad Rancheria Emergency Operations Center $ 715,705 Trinidad Rancheria Trinity Valley Consulting Engineers, Inc. 100% 12/22/2020 Thirsty Bear Lounge $ 295,997 Bear River Casino Resort I-S Design Build 100% 12/22/2020 Bear River Softball Field $ 830,859 Bear River Band of the Rohnerville Rancheria CleekCo. Drafting & Design 100% 11/20/2020 Humboldt County Courthouse 5th Floor Remodel $ 2,976,571 County of Humboldt Public Works NMR Architects 100% 10/1/2020 Coastal Grove Charter School $ 65,957 Arcata School District N/A 100% 9/24/2020 Fortuna Vets Hall $ 172,978 Humboldt County Publlc Works Mcsorley Architecture 100% 8/28/2020 Poletski's Appliance Fa~ade Remodel $ 214,486 Rick Poletski Cleekco Drafting & Design 100% 8/26/2020 Eagle Prairie Elementary Modernization $ 1,024,348 Rio Dell School District BCA 100% 8/20/2020 Church & Pine St. Development $ 612,000 Humboldt Development Company ORY Drafting and Design 100% 7/8/2020 Sunny Brae Middle School Modernization $ 3,694,300 Arcata School District Siskiyou Design Group 100% 4/3/2020 County of Humboldt Mental Health ADA $ 355,000 County of Humboldt Public Works Brokaw Design 100% 11/1/2019 Pacific Union School MP Roof and Wall $ 411,490 Pacific Union School District Siskiyou Design Group 100% 10/29/2019 County of Humboldt Clam Beach ADA $ 280,000 County of Humboldt Public Works KPA Architects 100% 9/15/2019 Public Defender ADA $ 68,720 County of Humboldt County Administrative Office The KPA Group 100% 9/10/2019 McKinleyville High School Phase 2 Fields $ 1,539,000 Northern Humboldt Unified School District Verde Design 100% 9/1/2019 Rio Dell Library $ 59,640 County of Humboldt County Administrative Office Brokaw Design 100% 8/20/2019 Humboldt Plaza Tenant Improvement $ 1,038,000 Humboldt Partners LLC Kash Boodjeh Architects 100% 8/1/2019 Jedediah Smith Redwoods State Park $ 423,699 State of California - Department of Parks & Recreation Laura Serena Wood 100% 8/1/2019 Veterans Memorial Building Seismic Retrofit $ 8,435,000 County of Humboldt Kash Boodjeh Architects 100% 7/15/2019 Stillman Way $ 412,000 Humboldt Development Company Design/Build 100% 5/21/2019 Freshwater Park ADA Improvements $ 164,000 County of Humboldt Public Works KPA Architects 100% 5/1/2019 Bear River Entertainment Center $ 4,438,000 Bear River Band Rohnerville Rancheria Paradigm Design 100% 5/1/2019 Bear River Gift Shop/Business Center $ 350,000 Bear River Casino Design/Build 100% 5/1/2019 Department of General Services TI $ 1,438,000 The Carrington Company Vitae 100% 3/20/2019 Salvation Army Sllvercrest $ 285,865 The Salvation Army Silvercrest aeekco Drafting & Design 100% 11/8/2018 Pacific Union School Computer Lab Removal $ 33,400 Pacific Union School District n/a 100% 8/1/2018 Humboldt Sr. Resource Center $ 77,060 Humboldt Senior Resource Center Pacific Affiliates 100% 7/1/2018 Fortuna Mixed Use Building $ 1,320,000 Humboldt Development Company Cleekco 100% S/1/2018 Humboldt County Jail ADA Project $ 151,000 County of Humboldt NMR Architects 100% 4/1/2018 147
~
'1,
Humboldt County Animal Shelter $ 12,184 County of Humboldt The KPA Group 100% 4/1/2018 Bear River Housing Phase VII $ 826,300 Bear River Band Rohnerville Rancheria SHN Consulting 100% 2/1/2018 q Humboldt State· SERC Building Addition $ 832,120 Humboldt State University Suarez-Kuehne Architecture 100% 9/15/2017 Juniper Apartment Remodel $ 645,000 Housing Humboldt Phillipe Lapotre 100% 9/1/2017 BMW New Dealership $ 1,798,000 Reza Lankarani Whitfield Associates 100% 3/1/2017 Crescent City Fire Hall Seismic Retrofit $ 1,248,000 City of Crescent City Stover Engineering 100% 2/1/2017 Bear River Recreation Center Phase 2 $ 4,350,000 Bear River Band of the Rohnerville Rancheria CleekCo 100% 7/30/2016 Marine Terminal 3 Remodel $ 878,000 Humboldt Bay Harbor Recreation & Conservation District Design/Build 100% 7/15/2016 McKinleyville Teen Center $ 2,015,000 McKlnleyville Community Services District LDA Partners, Inc. 100% 5/15/2016 MultiFamlly Housing $ 1,120,000 Humboldt Development Company CleekCo 100% 2/15/2016 Coast Central Credit Union Tl $ 465,000 Coast Central Credit Union Eric Lindstrom Architects 100% 11/15/2015 CR Mendocino Hall Reroof and Abatement $ 400,000 College of the Redwoods Nichols Rossetto. 100% 9/25/2015 Bear River Casino Gaming Floor Remodel $ 750,000 Bear River Casino 1-5 Design 100% 7/30/2015 Happy Camp Duplex Project $ 920,449 Karuk Tribe Housing Authority KAS & Associates, Inc. 100% 6/1/2015 NCUAQMD Tenant Improvement $ 262,761 NCUAQMD Eric Lindstrom Architects 100% 12/22/2014 Bear River Tribe Phase VI Homes $ 859,312 Bear River Band Rohnerville Rancheria LACO Associates 100% 12/14/2014 Eureka Internal Medicine Tl $ 110,615 St. Joseph Medical Design/Build 100% 11/17/2014 Trinidad Elementary School Modernization $ 1,842,825 Trinidad Union School District Siskiyou Design Group 100% 11/15/2014 Arcata Elementary School Modernization $ 2,337,676 Arcata School District Siskiyou Design Group 100% 9/30/2014 Tobacco Traders Coffee & Tobacco Store $ 632,082 Bear River Band Rohnerville Rancheria Matson & Vallerga 100% 9/1/2014 TisnNon Health & Wellness Phase I $ 438,000 Bear River Band of the Rohnerville Rancheria CleekCo 100% 6/1/2014 HSU Marine Wildlife Care Center Addition $ 289,000 Humboldt State University Suarez-Kuehne Architecture 100% 1/10/2014 Bear River Casino Addition $ 920,000 Bear River Casino Design/Build 100% 12/15/2013 Bear River Tribe Phase V Homes $ 984,000 Bear River Band of the Rohnerville Rancheria LACO Associates 100% 12/1/2013 Union Green Student Housing $ 2,242,000 Yurok Indian Housing Authority David Pierce Architect 100% 11/1/2013 SunnyBrae Middle School Modernization $ 909,000 Arcata School District Siskiyou Design Group 100% 10/31/2013 McKinleyvllle High School Media Center $ 268,000 Northern Humboldt Unified School District Davis Pierce Architect 100% 9/15/2013 Orleans Health and Wellness Center $ 625,000 KarukTribe Design/Build 100% 6/15/2013 Bear River Tribe Phase IV Homes $ 911,000 Bear River Band Rohnerville Rancheria LACO Associates 100% 4/1/2013 Vector Aquatic Center $ 615,000 Vector Rehabilitation Phillippe Lapotre 100% 3/1/2013 Eureka Muni. Auditorium Seismic $ 413,000 City of Eureka LACO Associates 100% 1/15/2013 County Health Dept. Tl $ 476,000 County of Humboldt 707 Architecture Workshop 100% 12/23/2012 HFD Station 11 Addition $ 538,000 Humboldt Fire District #1 JAG 100% 2/15/2012 148

REDWOOD COAST ENERGY AUTHORITY
---·-
;:;,,
TIME ~
;;-: S)- 0 :6
::,
UI --"" <.: ...., - RECEl'lD BY f > c---J i
OUf S w ,-. w ~- - INITIALS
~ w 0.... ft LJ..J .... , er: (/) ~
1i ..,
u;
-
I\ "-'•, ~"•°'·' If f II'.. I NI I, •1 , ~J l f, i r•-, 339 2"' Street. Eureka. CA 95501 / Loe. #87S823 / DIR 1000000607 BID PROPOSAL:

INSTALLATION OF EV CHARGING

STATIONS FOR RCEA CHARGING

NETWORK
Redwood Coast Energy Authority
633 3rd Street, Eureka, California 95501
9/17/24@ 1:00PM
RECEIVE[:

SEP 1 7 2024
149
Project: Installation of RCEA EV Charging Stations - McKinleyville/Arcata Invitation for Bids (IFB)-24-505
Bids received by no later than 1:00 pm September 17, 2024 Bidder
Base Bid:Total Bid
Amount Date/ Time Received
Addenda
Noted Bid Form
Bid
Security
Form/
Check
Sub-contractor
List Form
Bidder's
Qualification
Non-Coll.

Declaration
Worker's
Comp Cert
Debarment &
Suspension
Cert Form DIR # CSLB #
ATC $156,185.00 9/17/2024 at 11:02 AM X X X X X X X X 1001049299 944965 Hooven & Reece inc. $142,414.30 9/17/2024 at 12:35 PM X X X X X X X X 1000859605 1078205 Adams Commercial Gen.

Contracting $165,846.00 9/17/2024 at 12:52 PM X X X X X X X X 1000000607 875823 150
CA Lic. #875823
Phone: (707) 443-6000 • Fax: (707) 268-8381 • [email protected] 339 2nd Street, Eureka, CA 95501 • www.acgcinc.com Page 1 of 3 September 20, 2024
Mike Avcollie
Redwood Coast Energy Authority (RCEA)
633 3rd Street
Eureka, CA 95501
Sent via email: [email protected]; [email protected] Re: Bid Protest
Installation of EV Charging Stations for RCEA Network – Arcata & McKinleyville Dear Mr. Avcollie,
Per Specifications Section 00 73 00 Supplementary General Conditions, Article SGC 23. Bid Protest, we formally protest the bids submitted for the above-mentioned project on September 17, 2024 by both Hooven & Reese, Inc. and A.T.C.

Hooven & Reese, Inc.:

The bid packet submitted by Hooven & Reese, Inc. is missing the majority of Specifications Section 00 45 013 Bidder’s Qualifications and therefore does not comprise a responsive bid.

The idea that this form or lack thereof is inconsequential is not correct. If the form is inconsequential, then why is it included in the bid documents? There is no way to determine if the bidder is qualified to perform this work, as they did not submit their qualifications. For this reason, the bid of Hooven & Reese, Inc. should be thrown out.

Specifications Section 00 11 16 Invitation to Bidders clearly states:
“Each Bid must contain all components specified in Section 00 43 93 – Bid Submittal Check List and shall be submitted on the forms furnished by RCEA within the Bid Documents. All forms must be completed.” Specifications Section 00 21 13 Instructions to Bidders, Item E. Required Bid Form states:
“Bids must be full and complete. Bidders must complete all bid items and supply all information required by the bidding documents and specifications.” Additionally, Specifications Section 00 21 13 Instructions to Bidders, Item F. Contents of Bid Envelope lists in detail:
“The bid envelope shall contain all of the following:

Section 00 41 00 - Bid Form
CA Lic. #875823
Phone: (707) 443-6000 • Fax: (707) 268-8381 • [email protected] 339 2nd Street, Eureka, CA 95501 • www.acgcinc.com Page 2 of 3 Section 00 43 13 - Bid Security Form (Bid Bond), if required Section 00 43 36 - Subcontractor List
Section 00 45 13 – Bidder’s Qualification (emphasis added) Section 00 45 19 - Non-Collusion Declaration
Section 00 45 26 - Workers' Compensation Certification Statement Section 00 45 48 - Debarment and Suspension Certification” Specifications Section 00 43 93 Bid Submittal Check List also lists in detail:
“The following documents shall be submitted by each Bidder, as part of their complete Bid:

Section 00 41 00 – Bid Form
Section 00 43 13 – Bid Security Form (Bid Bond)
Section 00 43 36 – Subcontractor List
Section 00 45 13 – Bidder’s Qualifications (emphasis added) Section 00 45 19 – Non-Collusion Declaration
Section 00 45 26 – Workers’ Compensation Certification
Section 00 45 48 – Debarment and Suspension Certification END OF SECTION 00 43 93”
As described in the email sent September 20, 2024 by Mike Avcollie, Hooven & Reese, Inc. failed to include the Bidder’s Qualifications form provided in the bid documents in their bid packet and instead attached a separate sheet outlining previous projects completed by their company. The Bidder’s Qualifications form requests much more information that all other bidders are required to provide that Hooven & Reese, Inc. failed to provide, including Description of Bidder’s Organization, Nature of Operations, Surety Contact, and the bidder’s signature. The above repeatedly stated requirements have not been met and Hooven & Reese, Inc. should be disqualified as a responsive bidder.

A.T.C.

The bid submitted by A.T.C. should also be considered non-responsive, as this contractor is not currently registered with the Department of Industrial Relations (DIR) and they failed to include the required updated bid form.

A.T.C.’s registration with the DIR expired on June 30, 2024 and has not been renewed. Please see the attached printout from the DIR website. Specifications Section 00 11 16 Invitation to Bidders states:
“This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Each contractor or subcontractor listed on CA Lic. #875823
Phone: (707) 443-6000 • Fax: (707) 268-8381 • [email protected] 339 2nd Street, Eureka, CA 95501 • www.acgcinc.com Page 3 of 3 the bid proposal must be registered with the Department of Industrial Relations at the time of bidding pursuant to Labor Code section 1725.5.” Additionally, State of California Labor Code Section 1725.5 requires all contractors bidding on a Public Works project to have current registration with the DIR before submitting a bid. Please see the attached printout.

Addendum 1 of the bid documents included an updated Bid Form. As described in the email sent September 20, 2024 by Mike Avcollie, A.T.C. submitted their bid packet on the old Bid Form. Specifications Section 00 21 13 Instructions to Bidders, Item E. Required Bid Form states:
“All bidders must submit bids on the Section 00 41 00, the “Bid Form.” RCEA will reject as non-responsive any bid not submitted on the required form.” Addendum 1 updates the requirements of the bid and A.T.C. should be disqualified as a responsive bidder as a result of ignoring the updates provided in Addendum 1.

The bid proposal we submitted on September 17, 2024 is complete, on updated forms, and we hold current registration with the DIR. Adams Commercial General Contracting, Inc. is the only responsive bidder for this project and the contract should be awarded to our company.

Thank you,
_____
Will Adams, President
Cc: ATC, [email protected]
Hooven & Reese, [email protected]
Timothy J. Wykle: Mathews, Kluck, Walsh & Wykle, LLP, [email protected]

!"#!$%&#'()*&$&+,-./012+-3+4
5 6
789
6 7
7 :5:;<$=&/#!$%&#'()*&$&+,-./012+-3+4 7>

:
?@ABC8DEFG:5::12$H&#=,#!$%&#'()*&$&+,-./012+-3+4 IJKLMLM

67 6 NOPQRSTIMUVWXYZ[\]XY^Z_`W[aIJKbcIJdefg=&%h#,#!$%&#'()*&$&+,-./012+-3+4 ijklmnojmknpqorrstntuvpmtntwxynpyolmmkmqvpptjmvklmkstzyorv{vtwmksvwkl|strvpmtwvlosvwxnkxkpor|pys}tjmmkmqtntzyvnt~tlmp k{tjmvkl€‚€k{mqtƒysrvj„klmnojm„kwt|kntluoutvlmqtxtn{kn~oljtk{ol xysrvj†kn‡jklmnojmmqomvppys}tjmmkmqtntzyvnt~tlmpk{ mqvpjqoxmtnˆ‰knmqtxynxkptpk{mqvpptjmvkl|Šjklmnojmkn‹vljrywtpopysjklmnojmknopwt{vltws tjmvklŒˆˆ Žokzyorv{
{knntuvpmnomvklylwtnmqvpptjmvkl|ojklmnojmknpqorrwkorrk{mqt{krrk†vlu‘ ށŽi’tuvpmtn†vmqmqt“txonm~tlmk{”lwypmnvor’tromvklpvlmqt~olltnxntpjnvstws mqtwtxonm~tlmolwxo
olvlvmvorlklnt{ylwosrt oxxrvjomvkl{ttk{{kynqylwntwwkrronpŽ•€‚‚mkzyorv{ {knntuvpmnomvklylwtnmqvpptjmvklolwolollyorntlt†or{ttklknst{knt–yr k{ tojq
tonmqtnto{mtnˆqtwvntjmkn~o
tpmosrvpqolwow}ypmollyorntuvpmnomvklolwntlt†or{ttps
xysrvpqvlumqt{ttpklmqtwtxonm~tlm—p vlmtnltm†tspvmtˆqtvlvmvorntuvpmnomvklolwntlt†or{ttp~o stow}ypmtwlk~kntmqolollyorr
s
mqtwvntjmknmkpyxxknmmqtjkpmp pxtjv{vtwvltjmvklŒŒˆ˜ˆ Ž™™tuvllvlu–ylt|‚š|ojklmnojmkn~o ntuvpmtnknntlt†ojjknwvlumkmqvppyswv›vpvklvlollyorvljnt~tlmpyxmkmqntt tonp{nk~ mqtwomtk{ntuvpmnomvklˆ„klmnojmknp†qk†vpqmkwkpk†vrrstntzyvntwmkxntxo mqtoxxrvjosrtlklnt{ylwosrtoxxrvjomvklknntlt†or{ttp mkzyorv{ {knmqtly~stnk{
tonp{kn†qvjqmqt
†vpqmkxntntuvpmtnˆ Žƒnk›vwtt›vwtljt|wvpjrkpyntp|knntrtoptpopontltjtppon mktpmosrvpqorrk{mqt{krrk†vlu‘ Žiœkn‡tnp—jk~xtlpomvkljk›tnoutmqom~ttmpmqtntzyvnt~tlmpk{“v›vpvkl€Žjk~~tljvlu†vmqtjmvkl˜‚‚olwvljrywtppy{{vjvtlm jk›tnout{knol †kn‡tn†qk~mqtjklmnojmknt~xrk
pmkxtn{kn~†kn‡mqomvppys}tjmmkxnt›ovrvlu†outntzyvnt~tlmpkmqtnmqolo jklmnojmkn†qkvpptxonomtr ntuvpmtntwylwtnmqvpptjmvklˆ„k›tnout~o
stt›vwtljtws
ojynntlmolw›orvwjtnmv{vjomtk{†kn‡tnp— jk~xtlpomvklvlpynoljtknjtnmv{vjomvklk{ptr{vlpynoljtntzyvntwylwtntjmvklŒžk{mqt™ypvltppolwƒnk{tppvklp„kwtˆ Ž™”{oxxrvjosrt|mqtjklmnojmknvprvjtlptwvlojjknwoljt†vmq„qoxmtnšŽjk~~tljvlu†vmqtjmvklŒ‚‚‚k{mqt™ypvltppolwƒnk{tppvklp „kwtˆ Ž„qtjklmnojmknwktplkmqo›tol wtrvlzytlmrvosvrvm
mkolt~xrk
ttknmqtpmomt{knol
opptpp~tlmk{soj‡†outpknntromtw wo~outp|vlmtntpm|{vltp|knxtlormvtpxynpyolmmkol {vlor}ywu~tlm|knwtn|knwtmtn~vlomvkls
ojkynmknol
{twtnor|pmomt|knrkjor ow~vlvpmnomv›toutlj
|vljrywvluojkl{vn~twonsvmnomvklo†onwˆŸk†t›tn|{knxynxkptpk{mqvpxonounoxq|mqtjklmnojmknpqorrlkmst wvpzyorv{vtw{knol }ywu~tlm|knwtn|knwtmtn~vlomvklmqomvpylwtnoxxtor|xnk›vwtwmqommqtjklmnojmknqopptjyntwmqtxo ~tlmk{ol
o~kylmt›tlmyorr
{kylwwytmqnkyuqosklwknkmqtnoxxnkxnvomt~tolpˆ Ž“qtjklmnojmknvplkmjynntlmr wtsonntwylwtntjmvklŒŒŒˆknylwtnol
kmqtn{twtnorknpmomtro†xnk›vwvlu{knmqtwtson~tlmk{ jklmnojmknp{nk~xysrvj†kn‡pˆ Ž qtjklmnojmknqoplkmsvwkloxysrvj†kn‡pjklmnojm|sttlrvpmtwvlosvwxnkxkpor|kntluoutwvlmqtxtn{kn~oljtk{ojklmnojm{kn xysrvj†kn‡p†vmqkymstvluro†{yrr ntuvpmtntwvlojjknwoljt†vmqmqvpptjmvkl|†vmqvlmqtxntjtwvlu~klmqpknpvljtmqtt{{tjmv›twomtk{ mqtntzyvnt~tlmpptm{knmqvlpyswv›vpvklŽt|†qvjqt›tnvptonrvtn|olwqoplkmsttlo†onwtwojklmnojm{kn|knqoplkmtluoutwvlmqt xtn{kn~oljtk{|†kn‡klxnk}tjmpknwt›trkx~tlmp†vmqkymstvluro†{yrr ntuvpmtntwvlojjknwoljt†vmqtjmvklŒžˆ¡†vmqvlmqt
xntjtwvlu~klmqpˆ”{ojklmnojmknvp{kylwmkstvl›vkromvklk{mqtntzyvnt~tlmpk{mqvpxonounoxq|mqtxtnvkwk{wvpzyorv{vjomvklpqorrst †ov›twv{skmqk{mqt{krrk†vluontmnyt‘ Žvqtjklmnojmknqoplkmxnt›vkypr sttl{kylwmkstvl›vkromvklk{mqtntzyvnt~tlmpk{mqvpxonounoxq†vmqvlmqtxntjtwvlu ~klmqpˆ Žvvqtjklmnojmknxo polowwvmvklorlklnt{ylwosrtxtlorm
ntuvpmnomvkl{ttk{m†kmqkypolwwkrronpŽ•|‚‚‚ˆ Žs‰ttpntjtv›twxynpyolmmkmqvpptjmvklpqorrstwtxkpvmtwvlmqtmomtƒysrvjœkn‡p l{knjt~tlm‰ylwtpmosrvpqtws tjmvklŒŒˆ˜olw pqorrstyptwklr
{knmqtxynxkptppxtjv{vtwvlmqomptjmvklˆ Žjijklmnojmkn†qk{ovrpmkxo mqtntlt†or{ttntzyvntwylwtnxonounoxqށk{pyswv›vpvklŽoklknst{kntmqtt¢xvnomvklk{ol xnvknxtnvkw k{ntuvpmnomvklpqorrstxnkqvsvmtw{nk~svwwvluklkntluouvluvlmqtxtn{kn~oljtk{ol jklmnojm{knxysrvj†kn‡ylmvrkljtouovlntuvpmtntw xynpyolmmkmqvpptjmvklˆ”{mqt{ovryntmkxo mqtntlt†or{tt†opvlow›tnmtlm|mqtjklmnojmkn~o
ntlt†vmpntuvpmnomvklntmnkojmv›tr
s
xo
vlu olowwvmvklorlklnt{ylwosrtxtlorm
ntlt†or{tttzyormkmqto~kylmk{mqtntlt†or{tt†vmqvlš‚wo
pk{mqtwytwomtk{mqtntlt†or{ttˆ Žw”{|o{mtnoskw
o†onwvluojklmnojmojjtxmpmqtjklmnojmkn—psvwkno†onwpmqtjklmnojm|mqt†kn‡jk›tntws mqtsvwknjklmnojmvp wtmtn~vltwmkstoxysrvj†kn‡mk†qvjqtjmvklŒŒoxxrvtp|tvmqtnopmqtntpyrmk{owtmtn~vlomvkls mqtwvntjmknxynpyolmmktjmvklŒŒ˜ˆž knojkynmwtjvpvkl|mqtntzyvnt~tlmpk{mqvpptjmvklpqorrlkmoxxr |pys}tjmmkmqt{krrk†vluntzyvnt~tlmp‘ ށqtskw
mqomo†onwtwmqtjklmnojm{ovrtw|vlmqtsvwpxtjv{vjomvklknvlmqtjklmnojmwkjy~tlmp|mkvwtlmv{ opoxysrvj†kn‡mqomxknmvklk{ mqt†kn‡mqommqtwtmtn~vlomvklknwtjvpvklpysptzytlmr jroppv{vtpopoxysrvj†kn‡ˆ
£¤¥¦¤¥§¨©ª«©¬­®¯°±²³´µ®¯°±¶®·¸¹º¯µ»·µ°´¼¤³·»¯¶¤½º±²¸¾´¿¯À¯»¸±´²Á±²¿´ÂµÃĸŮƮ·Â¾´¿¯ÇÈÉÊË·º¸±»®¯Ç«µË¶¯»¸±´²Ì¹Åǫͥεε˴½Ï¶¸·¸¹¯¶Ç¥¦¥§Ð ĸ¸½¶ª¤¤®¯°±²³´µ®¯°±¶®·¸¹º¯µ»·µ°´¼¤³·»¯¶¤½º±²¸¾´¿¯À¯»¸±´²Á±²¿´ÂµÃĸŮƮ·Â¾´¿¯ÇÈÉÊË·º¸±»®¯Ç«µË¶¯»¸±´²Ì¹Åǫͥεε˴½Ï¶¸·¸¹¯¶Ç¥¦¥§Ë´½Ï»Ä·½¸¯ºÐ«¤¥

!!"#$

%

&

# "'(

(
&

&
&%

# '(

)
&
$&

%&

&*

+ &
$&

%

%
,

&
-&

%
*
# '

%

%.
/

0$&

. &

&
&

&
%%

%.

0 $&

.

%# +

!$#1

(

# '

,
&
1&

# 234567572898456757:;<=8=9>?@?ABCD>AEB<5F>?AG:;<=8=9>?@?HBCD>I?B<5F>?J>23KJLJGMNN5F=OP5QRS;?B?@?H>T5U58S5789VNQRS; JB?@?WB:;O=9VX6UYVPO9OV69><55S8=5YVU5Y8=OP5P5Y9OV6B898456757:;<5F>??VN<=8=9>?@?HBCD>I?>G Z[\][\^_`ab`cdefghijklefghmenopqflrnlgks[jnrfm[tqhioukvfwfrohkixhivkylz{o|e}enyukvf~€‚nqohref~bl‚mfrohkiƒp|~b„\ l
l‚kt†monopfm~\]\^‡
{ootma[[efghijklefghmenopqflrnlgks[jnrfm[tqhioukvfwfrohkixhivkylz{o|e}enyukvf~€‚nqohref~bl‚mfrohkiƒp|~b„\ l
l‚kt†monopfm~\]\^‚kt†r{ntofq‡\[\

! " "#$%&'(%#& "#$%&'(%#&)*+,$-++-.',/ '%(01234'5## (#. "#$%&'(%#&('%,#$-667'%- 898:;9<;9: "#$%&'(%#&=&+%$'.- 7&,-/ "#$%&'(%#&.',/,$>(,%4 !&,$,7'7 ?@AB@ACDEFG?HIJKLKMK
NOOPQF@@QRSTUVRQKWUSKVXKYZT@YQP[UW\WUS]P^_`UV]aZSbcOX_`R\d]VWZUA]`ROa]VZSR]VZeOSXVOZS]`ZZf^PcQgQ]UW\RVARhiCCVEVhCiGBaBh?W?RVBjBGEGW_G@C

!

"#
$%

&
' (
) *
+,-.,-/0123+45678797
:;;<=2,,=>?@AB>=7CA?7BD7EF@,E=<GACHCA?I<JKLABIMF?NO;DKL>HPIBCFA-IL>;MIBF?>IBFQ;?DB;F?ILFFRJ<O=S=IACH>B->TU//B1BT/U3.M.T+C+>B.V.313CK-,/

!"

#
!"

$ $ %! $!

$
&%
!'
$ (
!

)*+,*+-./01)23456575
899:;0**;<=>?@<;5A?=5@B5CD>*C;:E?AFA?=G:HIJ?@GKD=LM9BIJ<FNG@AD?+GJ<9KG@D=<G@DO9=B@9D=GJDDPH:M;Q;G?AF<@+<RS--@/@R-S1,K,R)A)<@,T,1/1AI/*-

!

"

"

#

$

%%
&
'

'

()*+)*,-
./0(
12345464
7889:/)):;<=>?;:4@><4?A4BC=)B:9D>@E@><F9GHI>?FJC<KL8AHI;EMF?@C>*FI;8JF?C<;F?CN8<A?8C<FICCOG9L:P:F>@E;?*;QR,,?.?Q,R0+J+Q(@(;?+S+0.0@H,),

Page 1 of 3 ends
← All documents from this meeting