event, to the extent the SPO Fee was already paid by the Project Participant or by CCCFA, Morgan Stanley agrees to reimburse the Project Participant or CCCFA, as appropriate. To the extent CCCFA incurs any SPO Fee if the bonds are not issued as a result of the Project Participant’s unwillingness or inability to proceed, other than due to an inability to achieve a minimum established target discount, the Project Participant agrees that it will be liable for such SPO Fee and make direct payment to Kestrel therefor, or to CCCFA if the SPO Fee was already paid by CCCFA.

Morgan Stanley shall have no responsibility for any fees or expenses incurred by CCCFA or the Project Participant, or their agents, employees, advisors or counsel, in connection with the issuance of the Bonds and the purchase of the Prepaid Energy, other than the Rating Agency Fee and SPO Fee as described in this MOU and as further described in the Bond Purchase Agreement (as defined herein).

Miscellaneous
CCCFA and Project Participant each acknowledge and agree that: (i) the transaction contemplated by this MOU is, in each case, an arm’s length, commercial transaction between the CCCFA and Morgan Stanley (in its role as “Underwriter” and/or the “Energy Supplier”, as applicable) in which the Underwriter and the Energy Supplier are each acting solely as a principal and not acting as a municipal advisor, financial advisor or fiduciary to CCCFA or the Project Participant; and (ii) CCCFA and the Project Participant will consult their own legal, accounting, tax, financial and other advisors, as applicable, to the extent each has deemed appropriate.

CCCFA acknowledges and agrees that Morgan Stanley is not making a commitment to extend credit, make a loan or otherwise fund the Bonds beyond the obligations contained in a mutually satisfactory bond purchase agreement (the “Bond Purchase Agreement”). CCCFA acknowledges that the services provided under this MOU involve professional judgment on Morgan Stanley’s part and that the results cannot be, and are not, guaranteed.

Nothing contained herein shall preclude the Underwriter from carrying on its customary and usual business activities. The Underwriter specifically reserves the right, but is not obligated, to bid for and maintain secondary markets on any of CCCFA’s outstanding bonds subject to appropriate information barriers. Services provided by the Underwriter in connection with this MOU shall not limit the Underwriter from providing services for CCCFA or the Project Participant in conjunction with other services requested by CCCFA or the Project Participant except as limited by rule of law or regulation.

In connection with the services agreed to herein, it is understood that the Underwriter will render professional services as an independent contractor. Neither the Underwriter nor any of its agents or employees shall be deemed an employee of CCCFA or the Project Participant for any purpose.

Except as described in this paragraph, this MOU is intended to be, and shall be construed only as, a non-binding MOU, intent on summarizing and evidencing discussions between CCCFA, the Project Participant, and Morgan Stanley, as of the date hereof. Except as described below, any legally binding obligation of the parties with respect to the transaction described herein shall exist only upon the execution and delivery of definitive agreements related thereto, into which this MOU 640
Memorandum of Understanding
June [__], 2025

Page 3 ends

and all prior discussions shall merge. It is expressly understood that this MOU is not a contract to execute any definitive agreements or to otherwise consummate the transactions described herein. The parties will cooperate in negotiating definitive agreements providing for the transactions contemplated by this MOU, but each party reserves the right of final approval or disapproval, for any reason, of the documentation relating to such agreements. Notwithstanding the foregoing, the provisions above under the headings “Rating Agency Fee and SPO Fee” shall be binding upon the parties.

Sincerely,
_________________________
Grant Fraunfelder, Executive Director
MORGAN STANLEY & CO. LLC
ACCEPTED AND AGREED:

SAN DIEGO COMMUNITY POWER
By: ____________________________
Name: Eric Washington
Title: Chief Financial Officer
Date: June [__], 2025

CALIFORNIA COMMUNITY CHOICE FINANCING AUTHORITY
By: ____________________________
Name: Garth Salisbury
Title: Treasurer – Controller
Date: June [__], 2025
641
7 R2025-07

EXHIBIT B
Additional Project Documents
(see attached)
642
DRAFT 05.27.25
A-1

APPENDIX A

SAN DIEGO COMMUNITY POWER
Introduction
San Diego Community Power (“SDCP”) is a joint powers authority organized and existing under the Joint Exercise of Powers Act (constituting Chapter 5 of Division 7 of Title 1 (commencing with Section 6500), as amended or supplemented from time to time) (the “Joint Powers Act”), as a “community choice aggregator” (“CCA”) as defined in Section 331.1 of the Public Utilities Code of the State of California, as amended (the “Public Utilities Code”). For a general description of “community choice aggregators” in California, see the section “COMMUNITY CHOICE AGGREGATORS” in this Official Statement.

Formation, History, and Purpose of SDCP
General. SDCP was created on October 1, 2019, under the name “San Diego Regional Community Choice Energy Authority” as a CCA in California under a Joint Powers Agreement, as amended, by and among the cities participating in SDCP and named therein (the “JPA”).

San Diego Community Power was established to provide electricity services at competitive rates to residents and businesses within the municipal boundaries of its member public agencies.

Pursuant to its JPA, SDCP focuses on delivering a cleaner energy portfolio and achieving energy consumption reduction goals and the following key priorities:
• Promotion of Renewable and Distributed Energy Resources: SDCP prioritizes the use and development of local, cost-effective, renewable, and distributed energy sources, supporting local power generation and storage initiatives. Currently, SDCP procures clean energy from solar, wind, geothermal, large-hydro, and biomass sources. • Exclusion of Coal and Avoidance of Nuclear Contracts: SDCP seeks to exclude coal and avoid entering into nuclear contracts as part of its overall procurement strategy. • Economic and Workforce Development: SDCP aims to benefit the region economically by supporting workforce programs and development initiatives, such as working closely and collaboratively with local and regional developers and unions. This helps promote long-term electric rate stability and energy reliability for residents and businesses, by, for example, prioritizing local long-term power purchase agreements that lock in renewable energy supply, allowing SDCP to build its power supply portfolio while also providing power supply cost certainty.
• Community Ownership and Energy Reliability: SDCP promotes personal and community ownership of renewable generation and energy storage resources, in order to foster a sustainable and energy-independent future.

The parties to SDCP’s JPA consist of local governments whose governing bodies elect to join SDCP. Under the Public Utilities Code, when new parties join SDCP, all electricity customers in their jurisdiction, except those served under California’s Direct Access Program, automatically become SDCP’s customers for electric generation, provided customers are allowed to “opt-out.” 643
DRAFT 05.27.25
A-2
Commencement of Service and Expansion. SDCP began operations in March 2021 by serving approximately 600 municipal accounts. SDCP enrolled approximately 72,000 municipal and business customers in June 2021. SDCP enrolled approximately 700,000 residential customer accounts throughout 2022 across the city limits of San Diego, Chula Vista, La Mesa, Encinitas, and Imperial Beach. SDCP enrolled approximately 180,000 residential and non-residential customer accounts in National City and Unincorporated areas of San Diego County in 2023. As of April 21, 2025, SDCP was serving 956,724 active accounts with approximately 7,700,000 MWh of annual retail sales.

Service Area
SDCP currently serves seven jurisdictions in the County of San Diego. These jurisdictions include six cities (including San Diego, Chula Vista, Encinitas, La Mesa, Imperial Beach, and National City) and the unincorporated communities of the County of San Diego. SDCP is responsible for acquiring electric power for its service area.

Service Area Map. The service area of SDCP is shown in blue on the map below:

644
DRAFT 05.27.25
A-3
Governance and Management
Board of Directors. SDCP is governed by a seven-member board of directors (the “Board of Directors”), with a board member from each of the seven jurisdictions in the County of San Diego. SDCP’s Board of Directors has the rights and powers to set rates for the services SDCP furnishes, incur indebtedness, and issue bonds or other obligations. SDCP’s local government structure ensures public transparency. The Board of Directors meets monthly to discuss matters related to the operation of SDCP. All meetings are open to the public, and public comments are encouraged.

Management.

Karin Burns, Chief Executive Officer. As Chief Executive Officer of SDCP, Karin Burns leads the 2nd largest community choice aggregator in California with a team of mission-driven professionals providing affordable, clean electricity to approximately 956,700 customer accounts in San Diego County. In this capacity, she oversees a budget in excess of $1.0 billion, ensures sufficient and reliable clean power procurement, and develops and executes the organization’s strategic plan in collaboration with the Board and staff.

Before becoming CEO, Karin most recently served as Vice President of Corporate Development and Regional Vice President of the Pacific Region at Franklin Energy, a national provider of energy efficiency, demand response, electrification, and grid optimization solutions.

Before Franklin Energy acquired its assets, Karin served as Chief Executive Officer of Build It Green, where she oversaw a team of 40+ personnel, managed a diverse set of programs across energy efficiency, workforce development, low-income solar and energy efficiency direct installation, healthy homes and reach codes for utilities and local governments.

Previously, Karin served as Executive Director of the nonprofit Code REDD, an environmental company she built into a globally recognized brand. She spearheaded strategic planning and operations, sourced funding from USAID and the McArthur Foundation, and built the successful Stand for Trees campaign.

Before leading high-growth organizations, Karin was a Managing Director at Ambata Capital, where she managed investment and advisory projects in electric vehicles, sustainable agriculture, green buildings, and clean energy. She was previously a Vice President at Gulf Capital, where she sourced, conducted due diligence, and invested in alternative energy, new media, and energy services companies across the Gulf Cooperation Council. She has served on several boards and advisory boards of non-profits, early-stage companies and investment funds from the U.S. to Asia. She began her M&A and corporate finance career at JPMorgan Chase in Hong Kong. Karin earned a Fulbright Scholarship to India, speaks multiple languages, and spent several years overseas in emerging markets from Brazil to China. She has earned Certificates in Energy Innovation and Innovation & Entrepreneurship from Stanford School of Engineering, an M.P.A. in international development from Harvard University, an M.B.A. in finance with distinction from Edinburgh Business School, and a B.A. with Honors from Duke University. 645
DRAFT 05.27.25
A-4
Dr. Eric Washington, Chief Financial Officer. Dr. Eric Washington manages SDCP’s annual operating budget, capital investment plan, investment portfolio, and risk management functions. He helps SDCP balance decarbonization goals with the mandate of affordable clean energy at competitive rates. Eric led the development of strategies for SDCP that strengthened the organization’s net asset position and cash flow. He was also critical in growing SDCP’s net revenue from $15 million to over $1 billion in two years. Among his many contributions to SDCP, Eric spearheaded credit facility negotiations, which increased SDCP’s credit access from $35 million to $150 million.

At various points in his career, Eric has managed the administration and compliance of a $350 million nonprofit finance program, managed a $158 million real estate loan portfolio, including construction finance to developers and acquisition finance to real estate investors, and built and managed a diverse team of professionals who provided corporate fiscal analyses, compliance monitoring, and finance reporting in support of several loan officers at various production offices.

Before his role at SDCP, Eric served as a military leader in the U.S. Navy for 26 years, fostering collaboration among diverse teams to meet organizational objectives. Eric also has 25 years of experience in corporate banking and finance. He has served as a vice president, senior credit manager, senior portfolio manager, and senior relationship manager at several regional banking institutions (including California Bank & Trust and Torrey Pines Bank). Eric received his Doctor of Education (Ed.D.) from San Diego State University, M.B.A. from Webster University, and a Bachelor of Science from Southern Illinois University, Carbondale.

Jack Clark, Chief Operating Officer. Jack Clark oversees the day-to-day financial and operational management of SDCP. He works closely with the CEO and CFO to operationalize and execute the strategy and vision for SDCP. Jack has over twenty years of experience overseeing energy, environmental, and cultural programming directed at developing solutions to climate change. Jack has overseen large-scale clean energy market transformation initiatives that help stabilize the relationship between people and the environment.

Before his role at SDCP, Jack was Vice President of Partnerships for commercial vehicle electrification infrastructure at Ideanomics. He was also Senior Director of Customer Programs at Clean Power Alliance of Southern California, California’s largest community choice aggregator.

Before his time at Clean Power Alliance, Jack was Vice President of Sustainable Energy Use at DNV GL.

Before that, Jack was the Deputy Director of the Energy & Sustainability Division at the City of San Diego, where he was responsible for implementing the City’s comprehensive energy strategy, working with staff, other City departments, and community members to incorporate a broad range of energy efficiency, clean, renewable generation, and environmental quality issues into City operations and community programming. He oversaw the city operations of energy use of over 3500 accounts, billing, rates, Municipal Energy Plan, community energy and sustainability programs, compliance with the City Climate Action Plan, and Community Choice Aggregation feasibility analysis on San Diego’s goal of reaching 100% Renewable Electricity by 2035. 646
DRAFT 05.27.25
A-5
Prior to his role with the City of San Diego, Jack was the Director of Programs at the Center for Sustainable Energy, where he led the organization's growth from a regional to a national non-profit focusing on strategy, development, and execution of renewable energy, energy efficiency, clean transportation, distributed generation, and advanced clean energy market transformation initiatives. Jack received a Master of Administration in Sustainable Planning and a Bachelor of Science in Anthropology and Environmental Sciences, both from Northern Arizona University.

Veera Tyagi, General Counsel. Veera Tyagi serves as the General Counsel for SDCP.

In this capacity, Veera is responsible for ensuring compliance with general governance laws, regulatory requirements, and overseeing all contracting. Veera brings nearly twenty years of legal experience, primarily as in-house counsel for regulatory agencies, to SDCP. In that capacity, Veera handled various matters, including advising and ensuring compliance with the California Environmental Quality Act, the Federal and State Clean Air Acts, and other environmental laws, and in litigating actions in both federal and state courts that are brought under those laws. Veera also has extensive experience advising on general governmental law issues, including the Public Records Act, the Brown Act, and contract laws. Veera’s background is a Bachelor’s in Environmental Earth Systems Science from Queen’s University, and a Juris Doctorate, Cum Laude from the University of La Verne College of Law. Veera is a member of the State Bar of California.

Chief Commercial Officer (Vacant). SDCP is currently evaluating candidates for the role of Chief Commercial Officer with the position expected to be fulfilled by Q4 2025.

Customers
General. SDCP currently provides energy to approximately 956,700 municipal, residential, commercial, and industrial accounts in its service area. SDCP’s current customer load mix is approximately 41% residential, 37% medium and large commercial/industrial, 19% small commercial, and 3% agricultural and lighting-based.

Customer Energy Choices. As part of its ongoing efforts to provide clean energy at the greatest value for its customers, SDCP offers four service plans: PowerBase, PowerOn, Power100, and Power100 Green+. PowerBase is SDCP’s most affordable service plan and is currently 45% renewable and currently priced with an approximately 5.0% discount under San Diego Gas & Electric (SDG&E) rates. PowerOn is 54% renewable and currently priced approximately 3.0% below SDG&E rates. Power100 and Power100 Green+ are 100% renewable, carbon-free, and the latter is Green-e® certified. PowerOn is SDCP’s default electricity service offering. Most customers within SDCP’s service territory are automatically enrolled in PowerOn, with the exception of the City of Encinitas, whereby per City Council decision, customers within its city limits are automatically enrolled in SDCP’s Power100 service, which costs $0.01/kWh more than PowerOn.

Customers can choose to opt- up to the Power100 and Power100 Green+ options and purchase 100% renewable and carbon-free electricity at a slight premium. These options enable SDCP’s customers to take a more significant step towards reducing their carbon footprint.

Power100 Green+ provides 100% renewable, carbon-free, and Green-e® certified energy for businesses seeking LEED certification or requiring Green-e® certification to meet their corporate 647
DRAFT 05.27.25
A-6
social responsibility goals. Power100 Green+ costs $0.02 per kWh more than the standard PowerOn service level. Power100 Green+ allows customers to meet their organization’s reliability standards. Residents and businesses that do not require specific certification can still obtain 100% renewable and carbon-free power through Power100.

In 2025, the average SDCP residential customer is projected to use 341 kWh per month such that PowerOn will cost the average residential customer $1 per month above PowerBase.

Compared to SDG&E’s rates, PowerOn is expected to cost approximately $1.50 per month less for a typical residential customer. Compared to SDG&E’s rates, Power100 is expected to cost about $2 per month extra for a typical residential customer.

Customer Enrollment. Most customers within SDCP’s service territory are automatically enrolled in PowerOn, except for the City of Encinitas, wherein the City Council voted to automatically enroll customers within its city limits in SDCP’s Power100 service. Once enrolled, customers may opt up to Power100 or Power100 Green+ service, opt down to PowerBase service, or opt out of SDCP’s service.

New Customers. FY 2023-24 was SDCP’s first full year of operations, with its seven-member jurisdictions reaching full enrollment. There are no near-term plans for expansion.

Customer Election to Opt-out of Service. Customers have the right to opt out of SDCP service at any time and will not be charged any fees by SDCP if they opt out or cancel electric services. Customers who opt out before starting SDCP service or within the first 60 days of SDCP service may return to SDCP service at any time. Customers who opt out after the first 60 days of service with SDCP will be prohibited by SDG&E from returning to SDCP for one year and will be charged a one-time customer re-entry fee by SDG&E and will also be required to choose one of two options: an immediate return to SDG&E service, or a 6-month return to SDG&E service.

Cumulative Opt-Out Rate and Customer Retention. As of April 21, 2025, SDCP is serving a cumulative total count of 956,724 active accounts for a total participation rate of 95.4%.

Customers with newly established accounts or who have moved into a new service address within any of SDCP’s member jurisdictions receive two post-enrollment notices through the mail at their mailing address on file within 60 days of their account start date to notify them that they have defaulted to SDCP electric generation service.

The following graphic illustrates SDCP’s opt-out rate and customer retention data through April 21, 2025, reflected as a percentage of participation rates by jurisdiction. 648
DRAFT 05.27.25
A-7
649
DRAFT 05.27.25
A-8
Service Rates
General. SDCP electric generation rates are managed to provide cleaner electricity at competitive rates. SDCP’s Board of Directors determines rates and SDCP’s rates are not regulated by the California Public Utilities Commission (the “CPUC”). Any rate changes will be adopted at duly noticed public meetings of the SDCP Board of Directors. Under the terms of the Clean Energy Purchase Contract, SDCP covenants that it will establish, maintain, and set rates and charges to provide revenues sufficient to enable it to pay all amounts payable from the revenues of its operations and to keep any reserves as required by SDCP’s reserve policies. SDCP further covenants pursuant to the terms of the Clean Energy Purchase Contract that it will not grant any lien or security interest in, or otherwise pledge or encumber revenues if the effect of such lien, pledge or other encumbrance would result in such lien, pledge or encumbrance having priority over the obligations of SDCP under the Clean Energy Purchase Contract.

Determination of Rates for Energy. A customer’s cost of electric service is determined by SDCP’s charges for energy and SDG&E charges for transmission, distribution, and other non-by-passable charges. Changes to SDG&E or SDCP rates will impact cost comparisons between SDCP and SDG&E. SDG&E charges SDCP customers a monthly Power Charge Indifference Adjustment, which can vary annually based upon several market factors, including benchmarks for regional energy costs, resource adequacy, the year in which the community joined SDCP and other considerations, as well as a Franchise Fee Surcharge. SDCP has already accounted for these additional charges when calculating its commodity rates. Financial assistance programs like CARE (California Alternative Rates for Energy), FERA (Federal Electric Rate Assistance), and Medical Baseline Allowance remain the same for SDCP and SDG&E customers.

Current and Historical Rate Information. SDCP rates are designed to cover the costs of energy, resource adequacy, and operating, fund customer programs, and meet SDCP’s reserve and liquidity goals, as described in its Reserve Policy.

On January 18, 2024, the Board of Directors approved rates for SDCP that included:
• A 17.7% year-over-year average decrease, from 2023 to 2024, in SDCP electricity generation rates across all customer classes.
• A 23.2% year-over-year average decrease, from 2023 to 2024, in SDCP electricity generation winter rates and a 12.3% year-over-year average decrease in summer rates across all customer classes.
• Rates that support SDCP to maintain its current reserve levels and to allow it to work toward a 180-day cash-on-hand reserve target, with the goal of providing financial stability and support a credit rating.

Subsequently, on May 30, 2024, the Board of Directors approved the new PowerBase product offering that was effective July 1, 2024, which provided:
• A 2.5% discount for July through December 2024, compared to SDGE’s current rates as of March 1, 2024.
• A pathway for customers to return to SDCP’s standard service, PowerOn, or opt-up to Power100 more easily than if they opted out of SDCP service entirely. 650
DRAFT 05.27.25
A-9
• Support for SDCP’s mission to provide an affordable option that is cleaner than the competition.
• For 100% renewable energy by 2035 or sooner through customer retention, especially for price-sensitive customers.

On May 30, 2024, the Board of Directors approved the Power100 Green+ product offering, a stand-alone, 100% renewable, carbon-free energy service that is Green-e® certified. Power100 Green+ is priced as a $0.02/kWh adder to the PowerOn service and allows SDCP customers to earn LEED Tier 2 or 3 points in the renewable energy category. Currently, Power100 Green+ is only available to commercial and industrial customers.

Effective February 1, 2025, SDCP implemented rate changes resulting in the following comparisons for most SDCP customers, though exact comparisons may vary by rate schedule and customer usage:
• SDCP PowerOn is set at a ~3% discount to SDG&E’s rates on a total bill basis. • SDCP PowerBase is set at a ~5% discount to SDG&E's rates on a total bill basis.

SDCP’s Power100 and Power100 Green-e Certified services will maintain premiums of $0.01/kWh and $0.02/kWh, respectively.

California Renewable Portfolio Standards and Other Regulations General. Community choice aggregators such as SDCP are “load-serving entities” (“LSEs”) and, as such, are required to comply with California’s Renewable Portfolio Standard, Resource Adequacy requirements, and Power Source Disclosure requirements described below.

Renewable Portfolio Standard. California’s Renewable Portfolio Standard (“RPS”) requires LSEs to supply their retail sales with certain minimum quantities of eligible renewable energy. Senate Bill 100 directs all LSEs to procure 60% of their portfolios from RPS-eligible resources by 2030 and 100% of their retail sales from zero-carbon resources (or eligible renewable resources) by 2045. Based on the most recent Power Content Label filed with the California Energy Commission, in 2023, SDCP met 58.8% of its total retail sales with eligible RPS resources, which was above the 2023 RPS percentage target of 41.3%. SDCP has exceeded the annual RPS regulatory minimum requirements each year since its inception.

Resource Adequacy. Resource Adequacy (“RA”), a California program jointly administered by the CPUC, the California Energy Commission (“CEC”) and the California Independent System Operator (“CAISO”), directs LSEs to secure forward capacity and offer it into the CAISO’s Day-Ahead and Real-Time markets to ensure that there will be enough supply at suitable locations and with sufficient ramping capability to meet load. The RA program is comprised of three products: System RA, Local RA, and Flexible RA. Local RA obligations have been assigned to a Central Procurement Entity as of 2023.

Integrated Resource Planning. Integrated Resource Planning (“IRP”) requires LSEs to forecast their customer load and develop a plan to serve such load in alignment with their own vision and values and in accordance with regulatory requirements. In October 2015, California 651
DRAFT 05.27.25
A-10
codified this LSE responsibility with the passage of SB 350, which requires the CPUC to establish and oversee an IRP process to assist with meeting the state’s aggressive GHG targets (40% below 1990 levels by 2030). The IRP process, which is used in many states across the US, generally produces 10- to 20-year plans that map out both the supply-side and demand-side resources required for meeting customer load. Given the complexity of the grid and the time required to plan and build generating facilities, IRPs are critical for ensuring safe, reliable and clean power in a cost-effective manner. In addition to addressing the long-term planning horizon typical of an IRP process, the IRP process has been used in recent years to direct procurement of new capacity to meet near- and mid-term reliability and clean energy needs per CPUC Decision (“D.”) 19-11-016, D. 21-06-035 and D. 23-02-040. Pursuant to the procurement orders in these CPUC Decisions, LSEs are required to procure “Incremental System Capacity,” which is RA capacity from non-emitting, storage, and/or renewable resources that are in addition to the resources identified on a baseline list of existing, on-line and operating resources. SDCP has a strong track record of meeting its RA obligations, falling short only during periods of extreme resource scarcity. SDCP expects to meet its future RA obligations through its Energy Risk Management Policy to the extent that supply is available in the bilateral markets
Power Source Disclosure. California law requires LSEs to disclose the types of power resources used to supply retail sales. This mandate, known as the Power Source Disclosure Program (“PSDP”), is a consumer information program managed by the CEC. A key output of the PSDP is the Power Content Label (“PCL”). The PCL is an LSE-specific document that shows the breakdown of power resource types for each of the LSE’s energy products used to serve retail load and a breakdown of resource types for the overall California grid. The PCL is distributed to customers each year.

Energy Demand
Long-Term Load Forecast. SDCP’s long-term load forecast is a projection of the electricity that SDCP’s customers will consume. SDCP’s long-term load forecast considers the number and types of customers that SDCP expects to serve, historical electricity use patterns, temperature, and other weather conditions, as well as trends in energy efficiency, behind-the-meter, rooftop solar and electric vehicle adoption, appliance electrification, and other factors.

The table below shows SDCP’s long-term load forecast for 2025-2034 based on SDCP’s 2023 RPS Compliance Report filed with the CPUC on January 25, 2024. 652
DRAFT 05.27.25
A-11
Sources of Energy
General. In its procurement of energy supplies, SDCP prioritizes using and developing local renewable resources, stimulating local job creation through various programs and development, promoting personal and community ownership of distributed renewable resources, and promoting long-term electric rate stability and energy reliability for residents and businesses.

Energy Purchases. During the ordinary course of business, SDCP purchases electrical power from numerous suppliers. Electricity costs include the cost of energy and capacity arising from bilateral contracts with energy suppliers, generation credits, load, and other charges stemming from SDCP’s participation in the CAISO’s centralized market.

As SDCP strives to meet its environmental, financial, and regulatory compliance goals and requirements, long-term power purchase agreements (“PPAs”) are becoming integral components of its energy supply portfolio. Long-term PPAs provide renewable generation facility developers with a specific revenue stream against which they can finance upfront capital requirements, such that each long-term PPA that SDCP signs with a developing facility will underpin a new, incremental renewable energy project. In addition, long-term PPAs lock in renewable energy supply around which SDCP can build its power supply portfolio while providing cost certainty so that SDCP can develop its pro forma financial model. Moreover, the California RPS, modified in 2015 by Senate Bill 350, requires that SDCP provide 65% of its RPS-required renewable energy from contracts of at least ten years. Finally, in D.21-06-025, the CPUC required each LSE in California to make significant long-term purchase commitments for resource adequacy from new, incremental generation facilities that will achieve commercial operation during 2023 through 2026 for purposes of “Mid Term Reliability”. These requirements have been augmented and extended into 2026 and 2027 via CPUC’s D.23-02-040.

Over the past 18 months, SDCP staff released four requests for proposals (“RFPs”) for eligible Renewable Energy resources, including an RFP for Stand Alone Storage projects and an RFP for clean firm energy, in pursuit of long-term contracts for renewable energy. SDCP evaluated other contracting opportunities to meet SDCP’s procurement goals. The SDCP Board, through April 2025, has approved contracts for over 1,670 MW of renewable generation and over 1,960 MW of storage capacity. SDCP staff continues to negotiate with several other developers for Table 1: SDCP's 2025-2034 Load Forecast (MWh)
Year Load Forecast
2025 8,094,390
2026 8,239,804
2027 8,386,117
2028 8,428,047
2029 8,470,187
2030 8,512,538
2031 8,555,101
2032 8,597,877
2033 8,640,866
2034 8,684,070
653
DRAFT 05.27.25
A-12
additional renewable energy resources expected to be online between 2025 and 2029. Under CAISO’s revisions to their cluster study process for interconnecting future projects, SDCP staff issued an RFP in August 2024 for CAISO Cluster 15 projects, which will serve as a source of renewable and storage projects that SDCP is most interested in getting studied by the CAISO.

SDCP staff and the Energy Contracts Working Group (the “ECWG”) evaluate all RFP submissions before entering into negotiations with selected participants. Assuming that SDCP staff and shortlisted developer(s) can agree to mutually agreeable contracts consistent with terms authorized by the ECWG, SDCP staff then review the draft terms with the SDCP Board for approval and authorization for the CEO to execute the relevant documents.

SDCP also has an open request for information regarding local projects (“RFI”). The RFI has yielded eight board-approved contracts for local generation and storage facilities in the last twelve months. SDCP also released a request for offers (“RFO”) for distributed renewable energy resources (“DERs”), which focuses on a broad range of distribution-level renewable projects within San Diego County. The RFO has yielded two board approved contracts for ~25 MW of capacity.

Energy Load and Supply Risk Management. Through SDCP’s Energy Risk Management Policy, SDCP measures and updates its risks using various tools that model programmatic financial projections, market exposure, risk metrics, and short-term budget updates. The following items are measured, monitored, and reported:
• Mark-to-Market Valuation – marking to market determines the current value of contracted energy supply.
• Exposure Reporting – calculates the notional dollar risk exposure and value at risk of open portfolio positions at current market prices.
• Open Position Monitoring— calculates/monitors open positions for all energy and capacity products monthly. If energy open positions for the month following the then current month (prompt month) exceed 10% of the load, SDCP will solicit market energy to close open positions and make a commercial decision to close the position. • Counterparty Credit Exposure – calculates the notional and mark-to-market exposure to each SDCP counterparty by deal and in the aggregate. Counterparty exposure reporting includes contingent collateral posting risks arising from changes in market prices and other factors.
• Reserve Requirement Targets – no less than once per year, SDCP staff monitors SDCP’s financial reserves to ensure that they meet the targeted thresholds.

SDCP manages market price risk using its planning models, which define forecasted load, energy under contract, and SDCP’s open positions across various energy product types, including renewable energy (Portfolio Content Category I, II, and III), carbon-free energy, and system power relative to SDCP’s procurement targets.

Generally, SDCP manages its exposure to energy suppliers by exhibiting a preference for counterparties with investment-grade credit ratings as determined by Moody’s or S&P Global Ratings and using security requirements in the form of cash or letters of credit. SDCP measures its mark-to-market counterparty credit exposure in a way consistent with industry best practices. 654
DRAFT 05.27.25
A-13
SDCP manages energy delivery risks by ensuring that contracts include appropriate contractual penalties for non-delivery and acquiring energy from a geographically and technologically diverse portfolio of generating assets (with a range of generation profiles generally complementary to how SDCP’s customers use electric power). Due to known production variability and supply uncertainty related to renewable and other carbon-free energy products, SDCP includes planning margins in procuring such products to ensure that related targets/mandates are achieved.

SDCP manages load forecasting and related weather risks by contracting with qualified data management and scheduling coordinators. These coordinators independently or jointly provide the systems and data necessary to forecast and schedule load using good utility practice.

Load variability is also considered when establishing appropriate planning margins for renewable and carbon-free energy sources.

SDCP manages its regulatory and legislative risk through active participation in working groups and advocacy coalitions, such as the California Community Choice Association. SDCP also regularly participates in regulatory rulemaking proceedings and legislative affairs to protect its interests.

Procurement. All contracting for energy and energy-related products for SDCP, including but not limited to electricity, capacity, energy efficiency, distributed energy resources, demand response, and storage, are overseen by SDCP’s Power Services department. All contracts are further reviewed and approved by SDCP’s CEO and General Counsel. SDCP procures energy and RA in a way that is consistent with its Energy Risk Management Policy. Procurement is conducted through market-based transactions for products, including Fixed Price Energy, Portfolio Content Category 1 Renewable Energy, Portfolio Content Category 2 Renewable Energy, Carbon-Free Energy, and RA Capacity, as well as through longer-term PPAs entered into pursuant to statutory requirements or voluntary long-term resource acquisition decisions made independently by SDCP under its Integrated Resource Plan or other Board or Director-approved strategies.

Short-term procurement is conducted through participation in the CAISO and bilateral markets. SDCP may use various methods to procure long-term contracts, including competitive solicitations, bilaterally negotiated agreements, or regulatory proceedings, with oversight, including shortlist approvals or procurement recommendations, provided by the ECWG of the Board. Specific long-term procurement (e.g., contract terms longer than three years) is subject to Board approval.

Long-term Contracts. To date, SDCP has contracted for ~1,670 MW of nameplate capacity for renewable energy generation and 1,960 MW of nameplate capacity for energy storage projects, identified in Table 2 below, with expected commercial operation dates between 2024 and 2029. 655
DRAFT 05.27.25
A-14
Table 2: Long Term Contracts
Developer/
Project
Guaranteed
Commercial
Operation
Date
Nameplate Type
Ormat / Pomona
2 Online 10 MW Storage (2-hour)
Arevon / Vikings
Energy Farm
Online 136.8 MW-AC Generating Facility
and
145.5 MW-AC / 582 MWh Storage
Facility
Solar + Storage
Pattern / Duran
Mesa
Online 50 MW Wind
Intersect /
Oberon II
Online 75 MW Solar
Ormat /
Arrowleaf Solar
and Storage
4/15/25 42 MW-AC Generating Facility and
35 MW-AC / 140 MWh Storage
Facility
Solar + Storage
NextEra /
Yellow Pine
Solar:
6/1/27
Storage:
6/1/27
35 MW-AC Generating Facility and
35 MW-AC / 140 MWh Storage
Facility
Solar + Storage
SBE / Athos 1/1/26 200 MW Storage
Aypa / Vidal 12/1/26 160 MW (solar)
160 MW (storage)
Solar + Storage
Arevon / Avocet 4/15/26 200 MW Storage
MRP / Border 6/1/26 52 MW Storage (1-hour)
MRP / Enterprise 6/1/26 52 MW Storage (1-hour)
Wellhead /
CVEC2
6/1/26 49.7 MW Storage
Baywa / JVR
Energy Park
10/31/26 90 MW-AC solar photovoltaic
Generation Facility combined with a
70 MW-AC / 280 MWh-AC DC-coupled battery energy storage facility
Solar + Storage
Pattern / SunZia 3/31/27 150 MW Wind
NextEra / Desert
Sands
6/1/27 60 MW Long Duration
Storage
SBE / Pelicans
Jaw
9/1/26 440 MW (solar)
238.5 MW (storage)
Solar + Storage
Nobel Solar /
Purple Sage
6/1/28 400 MW (solar)
400 MW (storage)
Solar + Storage
Aypa / Euismod 6/1/28 200 MW Storage
656
DRAFT 05.27.25
A-15
Information Technology, Data Analytics and Cyber Security SDCP’s Information Technology (“IT”) and Data Analytics department is comprised of professionals who handle all aspects of information technology management, cloud infrastructure, and cybersecurity. This department is building a secure data platform that will enable and empower SDCP staff to develop full-scale in-house data management, data engineering, data science, and analytics capabilities. SDCP’s IT and Data Analytics Team focus on developing core operational competencies such as an Energy Trade & Risk Management application or Distributed Energy Resource Management platform to deliver efficiencies, simplifications, and cost savings for SDCP customers.

This department also oversees and is accountable for developing additional IT policies and standards, including responsible Artificial Intelligence and cybersecurity, identifying risk areas, and helping all personnel comply with policies and standards. All SDCP staff are responsible for reporting any noncompliance to management. SDCP makes information technology accessible only to authorized employees or designated vendors as needed, and only for authorized agency purposes.

SDCP’s IT and Data Analytics department has begun a holistic cybersecurity program leveraging the NIST 800 framework and ISO 27001 standards. SDCP’s current and new cybersecurity standards work to minimize threats and exposure to its assets and information.

SDCP additionally holds cybersecurity insurance coverage.

Financial Information
Revenues from Energy Sales and Operating Expenses. SDCP’s operating revenues are from selling electricity to commercial and residential customers throughout its territory. SDCP reports its revenue net of uncollectible accounts. In alignment with SDCP’s reserve policy and strategic goals, SDCP set rates in 2023,2024 and 2025 sufficient to grow revenue and net income to reach its 180-day cash-on-hand goal.

Other Sources of Revenue. In 2023, SDCP began receiving grant revenue from the California Public Utilities Commission Disadvantaged Communities-Green Tariff and Community Solar Green Tariff programs, which enable residential customers in disadvantaged communities who may be unable to install solar on their roof to benefit from a local solar project and receive a 20% bill discount. This funding originates from California Greenhouse Gas Auction Proceeds and Public Purpose Program funds.

In 2024, SDCP was also awarded $710,000 in grant funding from the California Department of Food and Agriculture to support its provision of technical assistance and refrigeration units to stock healthy food at stores in low income or low food-access areas throughout its service territory.

In January 2025, SDCP accepted, appropriated and developed plans to expend $124.27 million of funds from the CPUC to administer and implement energy efficiency programs focused on underserved and hard-to-reach residents, businesses, and public agencies in the region. Funds will be expended through the FY2025-29 capital investment plan. 657
DRAFT 05.27.25
A-16
SDCP additionally derives revenue from investment income. As SDCP’s operating reserves have grown, its investment income has also grown in lockstep as SDCP invests its reserves in interest-bearing accounts consistent with SDCP’s Investment Policy approved by the SDCP Board on June 27, 2024.

Financial Statements. For financial information related to SDCP, see the annual audited financial statements of SDCP for the fiscal years that ended June 30, 2024 and June 30, 2023, which are attached to this Official Statement as Appendix B.

Financial Reserves. SDCP maintains financial reserves, pursuant to the Financial Reserve Policy adopted by the Board of Directors, to be able to (a) meet SDCP’s strategic objectives; (b) secure, maintain, and improve a standalone investment grade credit rating; (c) secure favorable terms with vendors, including power producers; (d) satisfy working capital requirements; (e) adhere to contractual covenants; (f) provide funds to cover unanticipated expenditures; and (g) support rate stability.

Operating Reserve. SDCP maintains a reserve goal to secure 180 days of cash-on-hand held as unrestricted cash. Unrestricted cash equals total cash less cash held in accounts that are restricted from use (e.g., as collateral or by covenant). The contribution to operating reserves is determined through SDCP’s annual budget process as defined in the agency’s Budget Policy and SDCP’s rate-setting process as defined in the agency’s Rate Development Policy. To the extent that SDCP can meet operational expenses and maintain competitive rates, it will establish rates and adopt budgets to build and maintain its operating reserves at or above the 180-day cash-on-hand target level. As of March 31, 2025, its unrestricted net position totaled $401 million.

Risk Management. SDCP maintains a comprehensive risk management framework to identify and mitigate credit, liquidity, market, operational, regulatory, and other risks associated with participation in the California energy market. The framework employs credit risk strategies, including a preference for transacting with investment-grade counterparties, establishing credit limits, and securing collateral when necessary. SDCP utilizes hedging strategies, netting arrangements, and liquidity monitoring to address market risks. Internal controls and compliance mechanisms are in place to manage operational and regulatory risks, ensuring adherence to legal and market regulations. Risk monitoring and oversight are continuously performed through frequent reporting, with critical risks communicated promptly to stakeholders. This integrated approach enables SDCP to maintain a balanced risk profile while adapting to evolving market conditions.
658

SAN DIEGO COMMUNITY POWER
Staff Report – Item 16

TO: Board of Directors
FROM: Kenny Key, Director Power Contracts

VIA: Karin Burns, Chief Executive Officer
SUBJECT: Approve Amended and Restated Energy Storage Service Agreement with Yellow Pine Solar III, LLC
DATE: June 26, 2025

RECOMMENDATION:

Approve the proposed Amended and Restated Renewable Energy Storage Service Agreement with Yellow Pine Solar III, LLC to move the capacity between project sites, reduce the fixed capacity price, and make additional minor amendments, and authorize the Chief Executive Officer to execute the agreement.

BACKGROUND:

As San Diego Community Power (Community Power) strives to meet its environmental, financial, and regulatory compliance goals and requirements, long-term contracts of at least 10 years in duration are integral components of its energy supply portfolio. Long-term contracts provide renewable generation and clean energy storage facility developers with the certain revenue stream against which they can finance up-front capital requirements, so each long-term contract that Community Power signs with a developing facility will underpin a new, incremental renewable energy project. In addition, long-term contracts lock in energy and capacity supply around which Community Power can build its power supply portfolio while also providing power supply cost certainty around which Community Power can develop its pro forma financial model.

In D.21-06-025, the California Public Utilities Commission (CPUC) required each Load Serving Entity (LSE) in California to make significant long-term purchase commitments for resource adequacy from new, incremental generation and storage facilities that will achieve commercial operation during 2023 through 2026. Further, Decision 23-02-040 allowed LSEs to contract for long-lead time resources, including long duration storage, with commercial operations out into 2028 to meet its resource adequacy requirements.

The proposed Amended and Restated Energy Storage Service Agreement (ESSA) is for capacity, energy arbitrage and ancillary services benefits from a 60 MW/480 MWh, 8- hour battery energy storage facility (Yellow Pine BESS) with Yellow Pine Solar III, LLC, a 659
subsidiary of NextEra Energy Resources Development, LLC (NextEra). The original ESSA originated from an offer Community Power received in May 2023 via its 2023 Request for Offers for Standalone Storage. The Board approved the ESSA with Desert Sands Energy Storage II, LLC at the October 2023 board meeting.

After execution, the project was subject to notice about delays in critical network deliverability upgrades required by CAISO. These delays pushed the expected commercial operation date to the 2032-2034 timeline. Due to this delay, the project was deemed unviable. Community Power worked with NextEra to move the volumes to a different project site. The parties mutually agreed on terms to move forward with the project.

ANALYSIS AND DISCUSSION:

Staff negotiated the attached full toll ESSA for the purchase of capacity, energy arbitrage and ancillary services from the Yellow Pine BESS, which is a standalone battery storage project to be developed in Clark County, Nevada by NextEra.

The Yellow Pine BESS project is part of a larger planned standalone storage installation.

The ESSA also provides for a Guaranteed Commercial Operate date of June 1, 2027, which will provide sufficient buffer to help ensure the project meets the commercial operation date requirements under CPUC Decision 23-02-040.

Below is additional information regarding NextEra and the draft ESSA.

Background on NextEra:
• NextEra has over 33 years of experience with energy infrastructure development, predominantly renewable energy resources, in California • NextEra has developed over 4 GW in California across more than 30 projects • Notable recent projects from NextEra include:
• Desert Sunlight, 230 MW storage, 2022
• Arlington, 364 MW solar + 242 MW storage, 2022/2023
• Desert Peak, 400 MW standalone storage, 2023
• North Central Valley, 132 MW standalone storage, 2023 • Resurgence Solar, 138 MW solar + 115 MW storage, 2023 Contract Overview – Yellow Pine Solar III, LLC
• Project: 60 MW/480 MWh (8-hour) lithium-ion battery energy system • Project location: Clark County, Nevada
• Guaranteed commercial operation date: June 1, 2027
• Contract term: 20 years
• Pricing: Fixed capacity price adjusted for availability and verified capacity • Community Power would receive financial compensation in the event of seller’s failure to successfully achieve certain development milestones as well as seller’s failure to meet guaranteed efficiency rates once the project is operational. 660
Amendment Scope:
• Move the capacity from the Desert Sands project site to the Yellow Pine site • Reduce fixed capacity price
• Adjust language to accommodate slice of day resource adequacy requirements Community Benefits:
• NextEra is committed to a $250,000 contribution to a community benefits fund that is to be established to directly benefit stakeholders in Community Power’s service area.
• The project will provide 11 construction jobs and 1 permanent job. • The project will use union labor. NextEra’s primary engineering and procurement contractor will execute a project labor agreement for the project. • NextEra provides sole sponsorship of developing solar curriculum and research at University of Nevada Las Vegas, including mentoring the annual senior design project focused on solar energy systems.
• NextEra hosts a Renewable Energy Training (RET) simulation lab at University of Nevada Las Vegas and College of Southern Nevada.
• NextEra provides presentations at local high schools in Southern Nevada that highlight the benefits of renewable energy and growing career opportunities within the state.
• NextEra established an internship program that leads to career opportunities at NextEra solar and storage sites.
• NextEra has offered Clark County Public Schools to apply for its $50,000 STEM Classroom Makeover Grant.
• NextEra contributes back-to-school supplies in Clark County Public Schools. • NextEra contributes to the Three Square Food Bank in Clark County.

COMMITTEE REVIEW:

On June 3, 2025, the Energy Contracts Working Group (ECWG) approved key ESSA terms to move forward with the execution of this ESSA.

FISCAL IMPACT:

The competitive capacity pricing of the ESSA is confidential, but the long-term purchase of capacity, energy arbitration, and ancillary services will provide Community Power with significant value and cost certainty over the term of this ESSA.

ATTACHMENTS:

A: Amended and Restated Energy Storage Service Agreement with Yellow Pine Solar III, LLC (redacted version for commercially sensitive information) 661
ITEM 16

ATTACHMENT A
662
663
664
☒ Capacity Attributes
Scheduling Coordinator: Buyer or Buyer’s agent
Security Amount:

Development Security:

Performance Security:
665
i

TABLE OF CONTENTS
ARTICLE 1 DEFINITIONS .......................................................................................................... 1

1.1 Contract Definitions............................................................................................. 1

1.2 Rules of Interpretation ...................................................................................... 21 ARTICLE 2 TERM; CONDITIONS PRECEDENT ................................................................... 23

2.1 Contract Term. ................................................................................................... 23

2.2 Commercial Operation; Conditions Precedent ............................................... 23

2.3 Intentionally Omitted ........................................................................................ 24

2.4 Development; Construction; Progress Reports ............................................... 24

2.5 Remedial Action Plan ........................................................................................ 24

2.6 Pre-Commercial Operation Actions ................................................................. 25 ARTICLE 3 PURCHASE AND SALE ....................................................................................... 25

3.1 Product ................................................................................................................ 25

3.2 Discharging Energy ........................................................................................... 25

3.3 Capacity Attributes ............................................................................................ 25

3.4 Ancillary Services ............................................................................................... 26

3.5 Resource Adequacy Failure. ............................................................................. 26

3.6 Buyer’s Re-Sale of Product ............................................................................... 27

3.7 Compliance Expenditure Cap ........................................................................... 27 ARTICLE 4 OBLIGATIONS AND DELIVERIES .................................................................... 28

4.1 Delivery ............................................................................................................... 28

4.2 Interconnection .................................................................................................. 29

4.3 Seasonal Availability and Efficiency. ............................................................... 29

4.4 Facility Testing. .................................................................................................. 29

4.5 Testing Costs and Revenues. ............................................................................. 30

4.6 Facility Operations............................................................................................. 31

4.7 Dispatch Notices ................................................................................................. 31

4.8 Facility Unavailability to Receive Dispatch Notices ....................................... 31

4.9 Energy Management. ......................................................................................... 32

4.10 Capacity Availability Notice. ............................................................................ 34

4.11 Facility Rebalancing Dispatch .......................................................................... 34

4.12 Outages................................................................................................................ 34 ARTICLE 5 TAXES, GOVERNMENTAL COSTS ................................................................... 36

5.1 Allocation of Taxes and Charges ...................................................................... 36

5.2 Cooperation ........................................................................................................ 36 ARTICLE 6 MAINTENANCE AND REPAIR OF THE FACILITY ........................................ 36

6.1 Maintenance of the Facility ............................................................................... 36

6.2 Maintenance of Health and Safety ................................................................... 36

6.3 Shared Facilities ................................................................................................. 36 666
ii
ARTICLE 7 METERING ............................................................................................................ 37

7.1 Metering .............................................................................................................. 37

7.2 Meter Verification .............................................................................................. 37 ARTICLE 8 INVOICING AND PAYMENT; CREDIT ............................................................. 38

8.1 Invoicing.............................................................................................................. 38

8.2 Payment .............................................................................................................. 38

8.3 Books and Records ............................................................................................. 38

8.4 Payment Adjustments; Billing Errors ............................................................. 39

8.5 Billing Disputes................................................................................................... 39

8.6 Netting of Payments ........................................................................................... 39

8.7 Seller’s Development Security .......................................................................... 39

8.8 Seller’s Performance Security .......................................................................... 40

8.9 First Priority Security Interest in Cash or Cash Equivalent Collateral ....... 40

8.10 Provision of Financial Statements. ................................................................... 41 ARTICLE 9 NOTICES ................................................................................................................ 43

9.1 Addresses for the Delivery of Notices ............................................................... 43

9.2 Acceptable Means of Delivering Notice ........................................................... 43 ARTICLE 10 FORCE MAJEURE .............................................................................................. 44

10.1 Definition. ........................................................................................................... 44

10.2 No Liability If a Force Majeure Event Occurs ............................................... 45

10.3 Notice ................................................................................................................... 45

10.4 Termination Following Force Majeure Event ................................................. 45 ARTICLE 11 DEFAULTS; REMEDIES; TERMINATION ...................................................... 46

11.1 Events of Default ................................................................................................ 46

11.2 Remedies; Declaration of Early Termination Date ........................................ 49

11.3 Damage Payment; Termination Payment ....................................................... 50

11.4 Notice of Payment of Termination Payment or Damage Payment ............... 51

11.5 Disputes With Respect to Termination Payment or Damage Payment ........ 51

11.6 Seller Pre-COD Liability Limitations .............................................................. 51

11.7 Limitation on Seller’s Ability to Make or Agree to Third-Party Sales from the Facility after Early Termination Date .............................................. 52

11.8 Rights And Remedies Are Cumulative ............................................................ 52

11.9 Mitigation............................................................................................................ 52 ARTICLE 12 LIMITATION OF LIABILITY AND EXCLUSION OF WARRANTIES .......... 52

12.1 No Consequential Damages ............................................................................... 52

12.2 Waiver and Exclusion of Other Damages. ....................................................... 52 ARTICLE 13 REPRESENTATIONS AND WARRANTIES; COVENANTS .......................... 53

13.1 Seller’s Representations and Warranties ........................................................ 53

13.2 Buyer’s Representations and Warranties ........................................................ 54 667
iii

13.3 General Covenants ............................................................................................. 55

13.4 Seller’s Covenants .............................................................................................. 56

13.5 Project Labor ..................................................................................................... 56

13.6 Supplier Diversity .............................................................................................. 56

13.7 Community Benefits .......................................................................................... 56 ARTICLE 14 ASSIGNMENT ..................................................................................................... 57

14.1 General Prohibition on Assignments ............................................................... 57

14.2 Collateral Assignment; Financing Cooperation .............................................. 57

14.3 Permitted Assignments ...................................................................................... 57

14.4 Portfolio Financing. ........................................................................................... 58

14.5 Permitted Assignment by Buyer ....................................................................... 58 ARTICLE 15 DISPUTE RESOLUTION .................................................................................... 59

15.1 Governing Law ................................................................................................... 59

15.2 Judicial Reference .............................................................................................. 59

15.3 Dispute Resolution ............................................................................................. 59

15.4 Attorneys’ Fees ................................................................................................... 59 ARTICLE 16 INDEMNIFICATION ........................................................................................... 60

16.1 Indemnity. ........................................................................................................... 60

16.2 Claims.................................................................................................................. 60

16.3 Defense and Settlement...................................................................................... 60 ARTICLE 17 INSURANCE ........................................................................................................ 61

17.1 Insurance. ........................................................................................................... 61 ARTICLE 18 CONFIDENTIAL INFORMATION .................................................................... 62

18.1 Definition of Confidential Information ............................................................ 62

18.2 Duty to Maintain Confidentiality ..................................................................... 62

18.3 Irreparable Injury; Remedies ........................................................................... 63

18.4 Further Permitted Disclosure ........................................................................... 63

18.5 Press Releases ..................................................................................................... 63 ARTICLE 19 MISCELLANEOUS ............................................................................................. 64

19.1 Entire Agreement; Integration; Exhibits ......................................................... 64

19.2 Amendments ....................................................................................................... 64

19.3 No Waiver ........................................................................................................... 64

19.4 No Agency, Partnership, Joint Venture or Lease. .......................................... 64

19.5 Severability ......................................................................................................... 64

19.6 Mobile-Sierra...................................................................................................... 64

19.7 Counterparts ...................................................................................................... 65

19.8 Electronic Delivery ............................................................................................. 65

19.9 Binding Effect ..................................................................................................... 65

19.10 No Recourse to Members of Buyer ................................................................... 65

19.11 Forward Contract; Inapplicability/Waiver of Bankruptcy Code Section 366. ......................................................................................................... 65 668
669
1 AMENDED AND RESTATED

ENERGY STORAGE SERVICE AGREEMENT
(60MW - 8hr. BESS)
This Amended and Restated Energy Storage Service Agreement (60MW - 8hr. BESS) (“Agreement”) is entered into as of June ___, 2025 (the “Execution Date”), effective as of October 27, 2023 (the “Effective Date”), between Buyer and Seller. Buyer and Seller are sometimes referred to herein individually as a “Party” and jointly as the “Parties.” All capitalized terms used in this Agreement are used with the meanings ascribed to them in Article 1 to this Agreement.

RECITALS
WHEREAS, Buyer and Desert Sands Energy Storage II, LLC (“Desert Sands II”) previously entered into that certain Energy Storage Agreement dated as of October 27, 2023 (the “Prior ESA”), pursuant to which Desert Sands II agreed to sell, and Buyer agreed to purchase, on the terms and conditions set forth in the Prior ESA, certain product as set forth in the Prior ESA; WHEREAS, Desert Sands II has assigned and transferred all of its right, title, duties, obligations and interests in, to and under the Prior ESA to Seller pursuant to Section 14.3 of the Prior ESA;
WHEREAS, Seller intends to develop, design, construct, own, and operate the Facility; WHEREAS, Seller desires to sell, and Buyer desires to purchase, on the terms and conditions set forth in this Agreement, the Product; and WHEREAS, the Parties desire to amend and restate in its entirely the Prior ESA in accordance with the terms and conditions set forth in this Agreement.

NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, and for other good and valuable consideration, the sufficiency and adequacy of which are hereby acknowledged, the Parties agree to the following:

ARTICLE 1

DEFINITIONS

1.1 Contract Definitions. The following terms, when used herein with initial capitalization, shall have the meanings set forth below:
“AC” means alternating current.
“Accepted Compliance Costs” has the meaning set forth in Section 3.7(c). 670
2 “Affiliate” means, with respect to any Person, each Person that directly or indirectly controls, is controlled by, or is under common control with such designated Person. For purposes of this definition and the definition of “Permitted Transfer” and “Permitted Transferee”, “control” (including, with correlative meanings, the terms “controlled by” and “under common control with”), as used with respect to any Person, shall mean (a) the direct or indirect right to cast at least fifty percent (50%) of the votes exercisable at an annual general meeting (or its equivalent) of such Person or, if there are no such rights, direct or indirect ownership of at least fifty percent (50%) of the equity or other ownership interest in such Person, or (b) the right to direct the policies or operations of such Person. Notwithstanding the foregoing, the Parties hereby agree and acknowledge that with respect to Buyer the public entities designated as members or participants under the Joint Powers Agreement creating Buyer shall not constitute or otherwise be deemed an “Affiliate” for purposes of this Agreement, and with respect to Seller, Affiliate shall include any investment funds or publicly-traded vehicles for the ownership of operating power generation, storage, or transmission assets (such as a “yield co”) controlled by Seller, NextEra Energy, Inc. or an Affiliate of NextEra Energy, Inc., XPLR Infrastructure, LP (f/k/a NextEra Energy Partners, LP) (“NEP”), ”), XPLR Infrastructure Operating Partners, LP (f/k/a NextEra Energy Operating Partners, LP) (“NEOP”), and NextEra Energy Capital Holdings, Inc. (“NEECH”), and their respective direct or indirect subsidiaries.
“Agreement” has the meaning set forth in the Preamble and includes the Cover Sheet and all Exhibits hereto, and any schedules and written supplements hereto. “Alternative Dispatches” has the meaning set forth in Section 4.6(b). “Ancillary Services” means frequency regulation, spinning reserve, non-spinning reserve, regulation up, regulation down, voltage support, and any other ancillary services, in each case that the Facility is capable of providing consistent with the Operating Restrictions set forth in Exhibit Q, as each is defined in the CAISO Tariff, provided, for avoidance of doubt, the Ancillary Services do not include black start.
“Automated Dispatches” has the meaning set forth in Section 4.6(b). “Automated Dispatch System” or “ADS” has the meaning set forth in the CAISO Tariff. “Automatic Generation Control” or “AGC” has the meaning set forth in the CAISO Tariff.
“Availability Adjustment” has the meaning set forth in Exhibit C. “Availability Notice” has the meaning set forth in Section 4.10(b). “Availability Standards” has the meaning set forth in the CAISO Tariff or such other similar term as modified and approved by FERC hereafter to be incorporated in the CAISO Tariff. “Available Capacity” means the capacity of the Facility, expressed in whole MWs, that is mechanically available to charge and discharge Energy and provide Ancillary Services. 671
3 “Bankrupt” or “Bankruptcy” means with respect to any entity, such entity that (a) files a petition or otherwise commences, authorizes or acquiesces in the commencement of a proceeding or cause of action under any bankruptcy, insolvency, reorganization or similar Law, (b) has any such petition filed or commenced against it which remains unstayed or undismissed for a period of ninety (90) days, (c) makes an assignment or any general arrangement for the benefit of creditors, (d) otherwise becomes bankrupt or insolvent (however evidenced), (e) has a liquidator, administrator, receiver, trustee, conservator or similar official appointed with respect to it or any substantial portion of its property or assets, or (f) is generally unable to pay its debts as they fall due.
“Battery Charging Factor” means a fraction, the numerator of which is the amount of Charging Energy absorbed by the Facility after the first ten (10) hours of the charging phase of the applicable Capacity Test, and the denominator of which is the Effective Capacity. “Battery Discharging Factor” means one (1) minus a fraction, the numerator of which is the amount of Discharging Energy discharged during the first eight (8) hours of the discharging phase of the applicable Capacity Test, and the denominator of which is the Effective Capacity. “BESS Equipment” means batteries, battery modules, onboard sensors, control components, inverters, sub-inverters, transformers, or any of their components. “Business Day” means any day except a Saturday, Sunday, or a Federal Reserve Bank holiday in California. A Business Day begins at 8:00 a.m. and ends at 5:00 p.m. local time for the Party sending a Notice, or payment, or performing a specified action. “Buyer” has the meaning set forth on the Cover Sheet.
“Buyer Default” means an Event of Default of Buyer.
“Buyer Dispatched Test” has the meaning in Section 4.4(a)(ii). “Buyer’s Indemnified Parties” has the meaning set forth in Section 16.1(a). “CAISO” means the California Independent System Operator Corporation or any successor entity performing similar functions.
“CAISO Approved Meter” means a CAISO approved revenue quality meter or meters, metering scheme, CAISO approved data processing gateway or remote intelligence gateway, telemetering equipment and data acquisition services sufficient for monitoring, recording and reporting, in real time, all Charging Energy and Discharging Energy delivered to or from the Delivery Point.
“CAISO Certification” means the certification and testing requirements for a storage unit set forth in the CAISO Tariff that are applicable to the Facility, including certification and testing for all Ancillary Services (to the extent possible given that the Facility may not be deliverable on 672
4 a Full Capacity Deliverability Status basis at such time), PMAX, and PMIN associated with such storage units.
“CAISO Charges Invoice” has the meaning set forth in Exhibit D. “CAISO Dispatch” means any Charging Notice or Discharging Notice given by the CAISO to the Facility, whether through ADS, AGC or any successor communication protocol, communicating an Ancillary Service Award (as defined in the CAISO Tariff) or directing the Facility to charge or discharge at a specific MW rate for a specified period of time or amount of MWh.
“CAISO Grid” has the same meaning as “CAISO Controlled Grid” as defined in the CAISO Tariff.
“CAISO Tariff” means the California Independent System Operator Corporation Agreement and Tariff, Business Practice Manuals (BPMs), and Operating Procedures, as the same may be amended or modified from time-to-time and approved by FERC. “Capacity Attribute” means any current or future defined characteristic, certificate, tag, credit, or accounting construct associated with the ability of the Facility to charge, discharge and deliver to the Delivery Point at a particular moment and that can be purchased, sold or conveyed under CAISO or CPUC market rules, including Resource Adequacy Benefits. “Capacity Damages” has the meaning set forth in Section 5 of Exhibit B. “Capacity Test” or “CT” means any test or retest of the Facility to establish the Installed Capacity, Effective Capacity, or Efficiency Rate or any other test conducted pursuant to Exhibit O. “CEQA” means the California Environmental Quality Act, as amended or supplemented from time to time.
“Change of Control” means, except in connection with public market transactions of equity interests or capital stock of Seller’s Ultimate Parent, any circumstance in which Ultimate Parent ceases to own, directly or indirectly through one or more intermediate entities, more than fifty percent (50%) of the outstanding equity interests in Seller; provided that in calculating ownership percentages for all purposes of the foregoing:
(a) any ownership interest in Seller held by Ultimate Parent indirectly through one or more intermediate entities shall not be counted towards Ultimate Parent’s ownership interest in Seller unless Ultimate Parent directly or indirectly owns more than fifty percent (50%) of the outstanding equity interests in each such intermediate entity; and (b) ownership interests in Seller owned directly or indirectly by any Lender (including any cash equity or tax equity provider) or assignee or transferee thereof shall be excluded from the total outstanding equity interests in Seller; provided further, a Change of Control shall not be deemed to have occurred as a result of a Permitted Transfer.
673
674
6 “Costs” means, with respect to the Non-Defaulting Party, brokerage fees, commissions and other similar third-party transaction costs and expenses reasonably incurred by such Non-Defaulting Party either in terminating any arrangement pursuant to which it has hedged its obligations or entering into new arrangements which replace this Agreement; and all reasonable attorneys’ fees and expenses incurred by the Non-Defaulting Party in connection with terminating this Agreement.
“Cover Sheet” means the cover sheet to this Agreement, which is incorporated into this Agreement.
“COVID-19” means the epidemic disease designated COVID-19 and the related virus designated SARS-CoV-2 and any mutations thereof, and the efforts of a Governmental Authority to combat such disease.
“CPM Soft Offer Cap” has the meaning set forth in the CAISO Tariff. “CPUC” means the California Public Utilities Commission, or any successor entity performing similar functions.
“CPUC System RA Penalty Price” means the penalty price (in dollars per kW-month) adopted by the CPUC for a load serving entity’s failure to procure up to the system RAR that applies to the RA Shortfall Month.
“Credit Rating” means, with respect to any entity, the publicly available or (subject to the express condition that the Party seeking to use private rating reports has provided to the other Party true and correct copies of the private rating reports of such subject entity) private rating then assigned to such entity’s unsecured, senior long-term debt obligations (not supported by third party credit enhancements) or if such entity does not have a rating for its senior unsecured long-term debt, then the publicly available or (subject to the above parenthetical) private rating then assigned to such entity as an issuer rating by S&P, Fitch or Moody’s. If ratings by S&P, Fitch and Moody’s are not equivalent, the lower rating shall apply.
“Cure Plan” has the meaning set forth in Section 11.1(b)(iii). “Curtailment Order” means any of the following:
(a) CAISO orders, directs, alerts, or provides notice to a Party, including a CAISO Operating Order, to curtail deliveries of Facility Energy, and/or cease accepting or reduce acceptance of Charging Energy from the CAISO Grid for the following reasons: (i) any System Emergency, or (ii) any warning of an anticipated System Emergency, or warning of an imminent condition or situation, which jeopardizes CAISO’s electric system integrity or the integrity of other systems to which CAISO is connected;
(b) a curtailment ordered by the Participating Transmission Owner for reasons including, but not limited to, (i) any situation that affects normal function of the electric system including, but not limited to, any abnormal condition that requires action to prevent circumstances 675
676
8 “Discharging Notice” means the operating instruction, and any subsequent updates, given by Buyer, Buyer’s SC or the CAISO to the Facility, directing the Facility to discharge Discharging Energy at a specific MW rate or to a specified Stored Energy Level; provided, any such operating instruction or updates shall be in accordance with the Operating Restrictions. Any instruction to discharge the Facility pursuant to a Buyer Dispatched Test shall be considered a Discharging Notice.
“Disclosing Party” has the meaning set forth in Section 18.2. “Dispatch Notice” means any Charging Notice, Discharging Notice and any subsequent updates thereto, given by the CAISO, Buyer or Buyer’s SC, to Seller, directing the Facility to charge or discharge Energy at a specific MWh rate, for a specified period of time, and/or to a specified Stored Energy Level; provided, any such operating instruction or updates shall be in accordance with the Operating Restrictions.
“Early Termination Date” has the meaning set forth in Section 11.2(a). “Effective Capacity” means the lesser of (a) PMAX, and (b) maximum dependable operating capacity of the Facility to discharge Energy for eight (8) hours of continuous discharge, as measured in MW at the Delivery Point (i.e., measured at the Facility Meter and adjusted for Electrical Losses to the Delivery Point to the extent such Electrical Losses are not already reflected in the Facility Meter measurements) as determined pursuant to the most recent Capacity Test (including the Commercial Operation Capacity Test, and as evidenced by a certificate substantially in the form attached as Exhibit I hereto), in either case (a) or (b) up to but not in excess of (i) the Guaranteed Capacity (with respect to a Commercial Operation Capacity Test) or (ii) the Installed Capacity (with respect to any other Capacity Test).
“Effective Date” has the meaning set forth on the Preamble. “Effective Flexible Capacity” or “EFC” has the meaning set forth in the CAISO Tariff. “Efficiency Rate” means the tested rate calculated pursuant to Sections II.I(2) and III(A) of Exhibit O by dividing Discharging Energy by Charging Energy. “Electrical Losses” means, subject to meeting any applicable CAISO requirements and in accordance with Section 7.1, all transmission or transformation losses (a) between the Delivery Point and the Facility Metering Point associated with delivery of Charging Energy, and (b) between the Facility Metering Point and the Delivery Point associated with delivery of Discharging Energy.
“Energy” means electrical energy, measured in kilowatt-hours, megawatt-hours, or multiple units thereof.
677
9 “Event of Default” has the meaning set forth in Section 11.1. “Excused Hour” has the meaning set forth in Exhibit P.
“Execution Date” has the meaning set forth in the Preamble. “Facility” means the energy storage facility described on the Cover Sheet and in Exhibit A, located at the Site and including mechanical equipment and associated facilities and equipment required to deliver Product (but excluding any Shared Facilities), as such storage facility may be expanded or otherwise modified from time to time in accordance with the terms hereof. “Facility Energy” means the Discharging Energy.
“Facility Meter” means a CAISO Approved Meter, along with a CAISO-approved data processing gateway or remote intelligence gateway, telemetering equipment and data acquisition services sufficient for monitoring, recording and reporting, in real time, the amount of Charging Energy delivered to the Facility Metering Point and the amount of Discharging Energy discharged from the Facility at the Facility Metering Point to the Delivery Point for the purpose of invoicing in accordance with Section 8.1. The Facility may contain multiple measurement devices that will make up the Facility Meter, and, unless otherwise indicated, references to the Facility Meter shall mean all such measurement devices and the aggregated data of all such measurement devices, taken together.
“Facility Metering Point” means the location(s) of the Facility Meter shown in Exhibit R. “Facility Rebalancing Dispatch” has the meaning set forth in Section 4.11. “FERC” means the Federal Energy Regulatory Commission or any successor government agency.
“Flexible Capacity” has the meaning set forth in the CAISO Tariff. “Flexible RAR” means the flexible capacity requirements established for load-serving entities by the CAISO pursuant to the CAISO Tariff, the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority.
“Force Majeure Event” has the meaning set forth in Section 10.1(a). “Full Capacity Deliverability Status” or “FCDS” has the meaning set forth in the CAISO Tariff.
“Gains” means, with respect to the Non-Defaulting Party, an amount equal to the present value of the economic benefit to it, if any (exclusive of Costs), resulting from the termination of this Agreement for the remaining Contract Term, determined in a commercially reasonable manner. Factors used in determining the economic benefit to a Party may include reference to information supplied by one or more third parties, which shall exclude Affiliates of the 678
10 Non-Defaulting Party, including quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., SP-15), all of which should be calculated for the remaining Contract Term, and include the value of Capacity Attributes.
“Governmental Authority” means any federal, state, provincial, local or municipal government, any political subdivision thereof or any other governmental, congressional or parliamentary, regulatory, or judicial instrumentality, authority, body, agency, department, bureau, or entity with authority to bind a Party at law, including CAISO; provided, “Governmental Authority” shall not in any event include any Party.
“Guaranteed Capacity” means the maximum dependable operating capability of the Facility to discharge electric energy, as measured in MW AC at the Delivery Point for eight (8) hours of continuous discharge, as set forth on the Cover Sheet. “Guaranteed Commercial Operation Date” means the date set forth on the Cover Sheet, as such date may be extended pursuant to Exhibit B.
“Guaranteed Construction Start Date” means the date set forth on the Cover Sheet, as such date may be extended pursuant to Exhibit B.
“Guaranteed Efficiency Rate” means the minimum guaranteed Efficiency Rate of the Facility in each Contract Year of the Delivery Term, as set forth on the Cover Sheet. “Guaranteed RA Amount” means, at any point in time on or after the RA Guarantee Date, the maximum Net Qualifying Capacity (in MWs) for which a storage facility with storage capacity equal to the Installed Capacity with an eight (8)-hour continuous discharge capability at the Delivery Point, having achieved FDCS and performing with operational characteristics equal to those required by the Guaranteed Seasonal Availability and the Guaranteed Efficiency Rate, and as limited by the Operating Restrictions, may be counted toward meeting the RAR in any given Showing Month pursuant to the then current Law, including counting conventions set forth in the Resource Adequacy Rulings and the CAISO Tariff applicable to Resource Adequacy Resources. “Guaranteed Seasonal Availability” has the meaning set forth on the Cover Sheet. “Guarantor” means, with respect to Seller, any Person that (a) does not already have any material credit exposure to Buyer under any other agreements, guarantees, or other arrangements at the time its Guaranty is issued, (b) is an Affiliate of Seller, or other third party reasonably acceptable to Buyer, (c) has an Investment Grade Credit Rating, (e) is incorporated or organized in a
jurisdiction of the United States and is in good standing in such jurisdiction, and (f) executes and delivers a Guaranty for the benefit of Buyer. NEECH is approved as a Guarantor. “Guaranty” means a guaranty from a Guarantor provided for the benefit of Buyer substantially in the form attached as Exhibit L.
679
11 “Imbalance Energy” means the amount of Energy in MWh, in any given Settlement Period or Settlement Interval, by which the amount of Charging Energy or Discharging Energy, as applicable, deviates from the amount of Scheduled Energy. “Indemnified Party” shall mean (i) Buyer, with respect to all third-party claims, demands, losses, liabilities, penalties, and expenses arising out of, resulting from, or caused by the circumstances described in Section 16.1(a), and (ii) Seller, with respect to all third-party claims, demands, losses, liabilities, penalties, and expenses arising out of, resulting from, or caused by the circumstances described in Section 16.1(b).
“Indemnifying Party” shall mean (i) Seller, with respect to all third-party claims, demands, losses, liabilities, penalties, and expenses arising out of, resulting from, or caused by the circumstances described in Section 16.1(a), and (ii) Buyer, with respect to all third-party claims, demands, losses, liabilities, penalties, and expenses arising out of, resulting from, or caused by the circumstances described in Section 16.1(b).
“Initial Synchronization” means the commencement of Trial Operations (as defined in the CAISO Tariff).
“Installed Capacity” means the lesser of (a) PMAX, and (b) maximum dependable operating capacity of the Facility to discharge Energy for eight (8) hours of continuous discharge, as measured in MW AC at the Facility Meter Point by the Facility Meter and adjusted for Electrical Losses to the Delivery Point (to the extent such Electrical Losses are not already reflected in the Facility Meter measurements), that achieves Commercial Operation, as evidenced by a certificate substantially in the form attached as Exhibit I hereto, as such capacity may be adjusted pursuant to Section 5 of Exhibit B, but in either case (a) or (b) up to but not in excess of the Guaranteed Capacity.
“Insurable Force Majeure Event” means any Force Majeure Event that results in direct, physical loss to the Facility, excluding any Force Majeure Event involving any event or circumstance occurring at any point beyond the Delivery Point. “Inter-SC Trade” has the meaning set forth in the CAISO Tariff. “Interconnection Agreement” means the interconnection agreement(s) entered into by Seller or a Seller Affiliate pursuant to which the Facility will be interconnected with the Transmission System, providing for interconnection capacity available or allocable to the Facility that is no less than the Dedicated Interconnection Capacity, and pursuant to which Seller’s Interconnection Facilities and any other Interconnection Facilities will be constructed, operated and maintained during the Delivery Term.
680
681
13 a form substantially similar to the letter of credit set forth in: (a) Exhibit K or as previously provided by Seller to Buyer under the Prior ESA, if issued on behalf of Seller for the benefit of Buyer, .
“Licensed Professional Engineer” means an independent, professional engineer selected by Seller and reasonably acceptable to Buyer, licensed in the State of California or Nevada. “Local Capacity Area Resource” has the meaning set forth in the CAISO Tariff. “Local RAR” means the local Resource Adequacy Requirements established for load-serving entities by the CAISO pursuant to the CAISO Tariff, the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority with jurisdiction over Buyer. “Local RAR” may also be known as local area reliability, local resource adequacy, local resource adequacy procurement requirements, or local capacity requirement in other regulatory proceedings or legislative actions.
“Losses” means, with respect to the Non-Defaulting Party, an amount equal to the present value of the economic loss to it, if any (exclusive of Costs), resulting from termination of this Agreement for the remaining Contract Term, determined in a commercially reasonable manner.

Factors used in determining economic loss to a Party may include reference to information supplied by one or more third parties, which shall exclude Affiliates of the Non-Defaulting Party, including quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., SP-15), all of which should be calculated for the remaining Contract Term and must include the value of Capacity Attributes and Tax Credits. “Master File” has the meaning set forth in the CAISO Tariff. “Maximum Charging Capacity” means the highest level at which the Facility may be charged, expressed in MW and as set forth in Exhibit Q. “Maximum Discharging Capacity” means the highest level at which the Facility may be discharged, expressed in MW and as set forth in Exhibit Q. “Milestones” means the development activities for significant permitting, interconnection, and construction milestones set forth on the Cover Sheet. “Minimum Efficiency Rate” has the meaning set forth on the Cover Sheet. “Monthly Capacity Payment” means the payment required to be made by Buyer to Seller each month of the Delivery Term as compensation for the Product, as calculated in accordance with Exhibit C.
“Monthly Forecast” has the meaning set forth in Section 4.10(a). 682
14 “Moody’s” means Moody’s Investors Service, Inc., or its successor. “Must Offer Obligations” means the obligations to offer the Net Qualifying Capacity in order to satisfy Resource Adequacy Requirements, including under Section 40.6 of the CAISO Tariff.
“MW” means megawatts in alternating current, unless expressly stated in terms of direct current.
“MWh” means megawatt-hour measured in alternating current, unless expressly stated in terms of direct current.
“NEECH” has the meaning set forth in the definition of Affiliate. “NEER” means NextEra Energy Resources, LLC.
“NEOP” has the meaning set forth in the definition of Affiliate. “NEP” has the meaning set forth in the definition of Affiliate. “NERC” means the North American Electric Reliability Corporation, or any successor entity performing similar functions.
“Net Qualifying Capacity” or “NQC” has the meaning set forth in the CAISO Tariff. “Network Upgrades” means Delivery Network Upgrades and Reliability Network Upgrades.
“Non-Defaulting Party” has the meaning set forth in Section 11.2. 683
15 “Notice” shall, unless otherwise specified in the Agreement, mean written communications by a Party to be delivered by hand delivery, United States mail, next Business Day courier service, or electronic messaging (e-mail).
“Notification Deadline” in respect of a Showing Month shall be fifteen (15) Business Days before the relevant deadlines for the corresponding RA Compliance Showings for such Showing Month.
“Off-Peak Hour” means any hour that is not an On-Peak Hour. “On-Peak Hour” means any hour from hour-ending 0700 to hour-ending 2200 (i.e., 6:00 AM to 9:59 PM) on Monday through Saturday, Pacific Prevailing Time, excluding North American Electric Reliability Council (NERC) holidays.
“Operating Restrictions” means those restrictions, rules, requirements, and procedures set forth in Exhibit Q.
“Outage Schedule” has the meaning set forth in Section 4.12(a)(i). “Participating Transmission Owner” or “PTO” means an entity that owns, operates and maintains (or designates a third-party to operate or maintain on its behalf) transmission or distribution lines and associated facilities or has entitlements to use certain transmission or distribution lines and associated facilities where the Facility is interconnected. For purposes of this Agreement, the Participating Transmission Owner is set forth in Exhibit A. “Party” has the meaning set forth in the Preamble.
“Party A” has the meaning set forth in Section 8.9.
“Party B” has the meaning set forth in Section 8.9.
“Performance Security” means (i) cash or (ii) a Letter of Credit or (iii) a Guaranty in the amount set forth on the Cover Sheet.
“Permitted Transfer” means each of the following transactions:
(a) Transactions among Affiliates of Seller, including any corporate reorganization, merger, combination or similar transaction or transfer of assets or ownership interests involving Seller or its Affiliates; provided, that (i) the entity that is the Seller after completion of such transaction is a Permitted Transferee, (ii) Ultimate Parent retains the authority, directly or indirectly, to control Seller (or if applicable, the surviving entity), or (iii) a wholly-owned, indirect subsidiary of Ultimate Parent operates the Facility; (b) Any change of economic and voting rights triggered in Seller’s organization documents arising from the financing of the Facility and that does not result in the transfer of ownership, economic or voting rights in any entity that had no such rights immediately prior to the change;
684
685
17 “Portfolio” means the portfolio of electrical energy generating, electrical energy storage, or other assets and entities, including the Facility (or the interests of Seller or Seller’s Affiliates or the interests of their respective direct or indirect parent companies), that is pledged as collateral security in connection with a Portfolio Financing.
“Portfolio Financing” means any debt or equity financing incurred or entered into by an Affiliate of Seller that is secured only by a Portfolio. “Portfolio Financing Entity” means any Affiliate of Seller that incurs any debt or equity financing obligations in connection with any Portfolio Financing. “Prior ESA” has the meaning set forth in the Recitals.
“Product” has the meaning set forth on the Cover Sheet. “Progress Report” means a progress report including the items set forth in Exhibit E. “Prudent Operating Practice” means (a) the applicable practices, methods and acts required by or consistent with applicable Laws and reliability criteria, and otherwise engaged in or approved by a significant portion of the electric industry during the relevant time period with respect to grid-interconnected, utility-scale energy storage facilities in the Western United States, and (b) any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Prudent Operating Practice is not intended to be limited to the optimum practice, method or act to the exclusion of all others, but rather to acceptable practices, methods or acts generally accepted in the industry with respect to grid-interconnected, utility-scale energy storage facilities in the Western United States. Prudent Operating Practice shall include compliance with applicable Laws, applicable safety and reliability criteria, and the applicable criteria, rules and standards promulgated in the National Electric Safety Code and the National Electrical Code, as they may be amended or superseded from time to time, including the criteria, rules and standards of any successor organizations.
“Qualifying Capacity” has the meaning set forth in the CAISO Tariff. “RA Compliance Showing” means the (a) System RAR compliance or advisory showings (or similar or successor showings) and (b) Flexible RAR compliance or advisory showings (or similar successor showings), in each case, an entity is required to make to the CAISO pursuant to the CAISO Tariff, to the CPUC (and, to the extent authorized by the CPUC, to the CAISO) pursuant to the Resource Adequacy Rulings, or to any Governmental Authority. “RA Deficiency Amount” means the liquidated damages payment that Seller shall pay to Buyer for an applicable RA Shortfall Month, as calculated in accordance with Section 3.5(b). “RA Guarantee Date” has the meaning set forth on the Cover Sheet. 686
18 “RA Shortfall” has the meaning set forth in Section 3.5(b). “RA Shortfall Month” means, for purposes of calculating an RA Deficiency Amount under Section 3.4(a), any Showing Month, commencing with the First Showing Month, during which (i) the (a) lowest amount of Net Qualifying Capacity eligible to be qualified as RAR and, if applicable, Local RAR from the Facility by both the CPUC and CAISO for such Showing Month, plus (b) any Replacement RA (if applicable) that was included in the Showing Month for Buyer was less than (ii) the Guaranteed RA Amount for such Showing Month. “Real-Time Market” has the meaning set forth in the CAISO Tariff. “Receiving Party” has the meaning set forth in Section 18.2. “Reliability Network Upgrades” has the meaning set forth in the CAISO Tariff. “Remedial Action Plan” has the meaning in Section 2.4.
“Replacement RA” means replacement Resource Adequacy Benefits, if any, equivalent to those that would have been provided by the Facility with respect to the applicable month in which a RA Deficiency Amount is due to Buyer including the same Slice-of-Day (as defined in the Resource Adequacy Rulings), generation profile and related characteristics, any successor criteria applicable to the Facility, and as applicable, Flexible RAR and Local RA unless Buyer consents to accept Replacement RA from another facility that provides non-equivalent Resource Adequacy Benefits.
“Requested Confidential Information” has the meaning set forth in Section 18.2. “Resource Adequacy Benefits” means the rights and privileges attached to the Facility that satisfy any entity’s Resource Adequacy Requirements, as those obligations are set forth in any ruling issue by a Governmental Authority, including the Resource Adequacy Rulings, or the CAISO Tariff, and shall include Flexible Capacity and any local, zonal or otherwise locational attributes associated with the Facility.
“Resource Adequacy Capacity” or “RA Capacity” has the meaning set forth in the CAISO Tariff.
“Resource Adequacy Requirements” or “RAR” means the resource adequacy requirements applicable to an entity as established by the CAISO pursuant to the CAISO Tariff, by the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority.
“Resource Adequacy Resource” shall have the meaning used in Resource Adequacy Rulings.
“Resource Adequacy Rulings” means any applicable CPUC ruling or decision related to resource adequacy, or any other resource adequacy laws, rules or regulations enacted, adopted or promulgated by the CPUC or the CAISO, however described, as such decisions, rulings, Laws, rules or regulations may be amended or modified from time-to-time throughout the Contract Term. 687
19 “RETA” means the State of Nevada Renewable Energy Tax Abatement including pursuant to NRS 701A.300-.390, inclusive, and NAC 701A.500- 660, inclusive, as in effect from time-to-time throughout the Contract Term or any successor provision. “S&P” means the Standard & Poor’s Financial Services, LLC (a subsidiary of S&P Global Inc.) or its successor.
“SCADA Systems” means the standard supervisory control and data acquisition systems to be installed by Seller as part of the Facility, including those system components that enable Seller to receive ADS and AGC instructions from the CAISO or similar instructions from Buyer’s SC.
“Schedule” has the meaning set forth in the CAISO Tariff, and “Scheduled” and “Scheduling” have a corollary meaning.
“Scheduled Energy” means the Charging Energy schedule or Discharging Energy schedule, as applicable, that clears under the applicable CAISO market based on the final Day-Ahead Schedule, FMM Schedule (as defined in the CAISO Tariff), and/or any other financially binding Schedule, market instruction or CAISO dispatch for the Facility for a given period of time implemented in accordance with the CAISO Tariff.
“Scheduling Coordinator” or “SC” means an entity certified by the CAISO as qualifying as a Scheduling Coordinator pursuant to the CAISO Tariff for the purposes of undertaking the functions specified in “Responsibilities of a Scheduling Coordinator,” of the CAISO Tariff, as amended from time to time.
“Seasonal Availability” has the meaning set forth in Exhibit P. “Seasonal Period” means the Summer Season or the Winter Season. “Security Interest” has the meaning set forth in Section 8.9. “Seller” has the meaning set forth on the Cover Sheet.
“Seller’s Indemnified Parties” has the meaning set forth in Section 16.1(b). “Seller Initiated Test” has the meaning set forth in Section 4.4(a)(iii). “Settlement Amount” means the Non-Defaulting Party’s Costs and Losses, on the one hand, netted against its Gains, on the other. If the Non-Defaulting Party’s Costs and Losses exceed its Gains, then the Settlement Amount shall be an amount owing to the Non-Defaulting Party. If the Non-Defaulting Party’s Gains exceed its Costs and Losses, then the Settlement Amount shall be zero dollars ($0). The Settlement Amount does not include consequential, incidental, punitive, exemplary or indirect or business interruption damages. “Settlement Interval” has the meaning set forth in the CAISO Tariff. “Settlement Period” has the meaning set forth in the CAISO Tariff. 688
20 “Shared Facilities” means the gen-tie lines, transformers, substations, or other equipment, permits, contract rights, and other assets and property (real or personal), in each case, as necessary to enable delivery of Charging Energy and Discharging Energy to and from the Delivery Point to the Facility (which is excluded from Shared Facilities), including the Interconnection Agreement itself, that are used in common with third parties or by Seller for electric generation or storage facilities owned by Seller other than the Facility.
“Showing Month” shall be a calendar month of the Delivery Term, commencing with the First Showing Month, that is the subject of a RA Compliance Showing, as set forth in the Resource Adequacy Rulings and outlined in the CAISO Tariff. For illustrative purposes only, pursuant to the CAISO Tariff and Resource Adequacy Rulings in effect as of the Effective Date, the monthly RA Compliance Showing made in June is for the Showing Month of August. “Site” means the real property on which the Facility is or will be located, as further described in Exhibit A, and as shall be updated by Seller at the time Seller provides an executed Construction Start Date certificate in the form of Exhibit J to Buyer. “Site Control” means that, for the Contract Term, Seller or its Affiliate: (a) owns or has the option to purchase the Site; (b) is the lessee or has the option to lease the Site; or (c) is the holder of an easement or an option for an easement, right-of-way grant, or similar instrument with respect to the Site.
“SP-15” means the Existing Zone Generation Trading Hub for Existing Zone region SP15 as set forth in the CAISO Tariff.
“SQMD Plan” has the meaning set forth in the CAISO Tariff. “State of Charge” or “SOC” means the ratio of (a) the Stored Energy Level of the Facility to (b) the Effective Capacity multiplied by eight (8) hours, expressed as a percentage. “Station Use” means the Energy that is used within the Facility to power certain lights, motors, temperature control systems, control systems and other ancillary electrical loads that are necessary for operation of the Facility (or as otherwise defined by the retail energy provider and CAISO Tariff) except during periods in which the Facility is charging or discharging pursuant to a Charging Notice or Discharging Notice. Seller is solely responsible for Station Use. “Stored Energy Level” means, at a particular time, the amount of electric Energy in the Facility available to be discharged as Discharging Energy, expressed in MWh. “Summer Season” means the months of May through October, inclusive. “Subsequent Purchaser” means the purchaser or recipient of Product from Buyer in any conveyance, re-sale or remarketing of Product by Buyer. “Supplementary Capacity Test Protocol” has the meaning set forth in Exhibit O. “Supply Plan” has the meaning set forth in the CAISO Tariff. 689
21 “System Emergency” means any condition that requires, as determined and declared by CAISO or the Participating Transmission Owner, automatic or immediate action to (i) prevent or limit harm to or loss of life or property, (ii) prevent loss of transmission facilities or generation supply in the immediate vicinity of the Facility, or (iii) to preserve Transmission System reliability. “System RAR” means the Resource Adequacy Requirements established for load-serving entities by the CAISO pursuant to the CAISO Tariff, the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority, but excluding local and flexible Resource Adequacy Requirements. “System RAR” may also be known as system area reliability, system resource adequacy, system resource adequacy procurement requirements, or system capacity requirement in other regulatory proceedings or legislative actions. “Tax” or “Taxes” means all U.S. federal, state and local and any foreign taxes, levies, assessments, surcharges, duties and other fees and charges of any nature imposed by a Governmental Authority, whether currently in effect or adopted during the Contract Term, including ad valorem, excise, franchise, gross receipts, import/export, license, property, sales and use, stamp, transfer, payroll, unemployment, income, and any and all items of withholding, deficiency, penalty, additions, interest or assessment related thereto. “Tax Credits” means any (i) federal production tax credit, depreciation benefit, tax deduction and/or investment tax credit, including the ITC, specific to investments in renewable energy facilities and/or energy storage facilities, and any other state, and/or local tax benefit, grant or incentive including RETA, and (ii) any refundable credit, grant, or other cash payment in lieu of an incentive described in clause (i). For avoidance of doubt, any Tax Credits belong to Seller. “Termination Payment” has the meaning set forth in Section 11.3(b). “Throughput” means, for a day or Contract Year (as the context dictates), the cumulative amount of Discharging Energy from the Facility for such time period. “Transmission System” means the transmission facilities operated by the CAISO, now or hereafter in existence, which provide energy transmission service downstream from the Delivery Point.
“Transmission System Outage” means an outage on the Transmission System, other than a System Emergency, that is not caused by Seller’s actions or inactions and that prevents Buyer or the CAISO (as applicable) from receiving Facility Energy onto the Transmission System. “Ultimate Parent” means NextEra Energy, Inc., NEER, NEP, NEOP, or NEECH, and includes any combination thereof.
“Unplanned Outage” means a period during which the Facility is not capable of providing service due to the need to maintain or repair a component thereof, which period is not a Planned Outage.
“Winter Season” means the months of November through April, inclusive.

1.2 Rules of Interpretation. In this Agreement, except as expressly stated otherwise 690
22 or unless the context otherwise requires:
(a) headings and the rendering of text in bold and italics are for convenience and reference purposes only and do not affect the meaning or interpretation of this Agreement; (b) words importing the singular include the plural and vice versa and the masculine, feminine and neuter genders include all genders; (c) the words “hereof”, “herein”, and “hereunder” and words of similar import shall refer to this Agreement as a whole and not to any particular provision of this Agreement; (d) a reference to an Article, Section, paragraph, clause, Party, or Exhibit is a reference to that Article, Section, paragraph, clause of, or that Party or Exhibit to, this Agreement unless otherwise specified;
(e) a reference to a document or agreement, including this Agreement, shall mean such document, agreement or this Agreement including any amendment or supplement to, or replacement, novation or modification of such document, agreement or this Agreement, but disregarding any amendment, supplement, replacement, novation or modification made in breach of such document, agreement or this Agreement;
(f) a reference to a Person includes that Person’s successors and permitted assigns;
(g) the terms “include” and “including” mean “include or including (as applicable) without limitation” and any list of examples following such term shall in no way restrict or limit the generality of the word or provision in respect of which such examples are provided;
(h) references to any statute, code or statutory provision are to be construed as a reference to the same as it may have been, or may from time to time be, amended, modified or reenacted, and include references to all bylaws, instruments, orders and regulations for the time being made thereunder or deriving validity therefrom unless the context otherwise requires; (i) in the event of a conflict, a mathematical formula or other precise description of a concept or a term shall prevail over words providing a more general description of a concept or a term;
(j) references to any amount of money shall mean a reference to the amount in United States Dollars;
(k) the expression “and/or” when used as a conjunction shall connote “any or all of”;
(l) words, phrases or expressions not otherwise defined herein that (i) have a generally accepted meaning in Prudent Operating Practice shall have such meaning in this Agreement or (ii) do not have well known and generally accepted meaning in Prudent Operating 691
692
24 (c) Intentionally omitted;
(d) A Participating Generator Agreement and a Meter Service Agreement between Seller and CAISO shall have been executed and delivered and be in full force and effect, and a copy of each such agreement delivered to Buyer;
(e) Seller has obtained CAISO Certification for the Facility other than for Ancillary Services, which shall not be required to achieve the Commercial Operation Date or the start of the Delivery Term;
(f) The Facility has successfully completed all testing required by Prudent Operating Practice or any requirement of Law to operate the Facility; (g) All applicable regulatory authorizations, approvals and permits for the operation of the Facility have been obtained and all conditions thereof that are capable of being satisfied on the Commercial Operation Date have been satisfied and shall be in full force and effect;
(h) Seller or its Affiliate has Site Control;
(i) Seller has delivered the Performance Security to Buyer in accordance with Section 8.8, which may be provided in part by designating the Delivery Security as Performance Security;
(j) Insurance requirements for the Facility have been met, with evidence provided in writing to Buyer, in accordance with Section 17.1; and (f) Seller has paid Buyer for all amounts owing under this Agreement as of the Commercial Operation Date, if any, including Daily Delay Damages and Commercial Operation Delay Damages.

2.3 Intentionally Omitted.

2.4 Development; Construction; Progress Reports. Within fifteen (15) days after the close of (i) each calendar quarter from the first calendar quarter following the Effective Date until the Construction Start Date, and (ii) each calendar month from the first calendar month following the Construction Start Date until the Commercial Operation Date, Seller shall provide to Buyer a Progress Report and agrees to regularly scheduled meetings between representatives of Buyer and Seller to review such reports and discuss Seller’s construction progress. The form of the Progress Report is set forth in Exhibit E. Seller shall also provide Buyer with any reasonably requested documentation (subject to confidentiality restrictions) directly related to the achievement of Milestones within ten (10) Business Days of receipt of such request by Seller. Seller is solely responsible for the design and construction of the Facility, including the location of the Site, the Facility layout, and the selection and procurement of the equipment comprising the Facility.

2.5 Remedial Action Plan. If Seller misses a Milestone by more than ninety (90) days, except as the result of Force Majeure Event or Buyer Default, Seller shall submit to Buyer, within ten (10) Business Days of the end of such ninety (90)-day period following the Milestone 693
25 completion date, a remedial action plan (“Remedial Action Plan”), which will describe in detail any delays (actual or anticipated) beyond the scheduled Milestone dates, including the cause of the delay (e.g., governmental approvals, financing, property acquisition, design activities, equipment procurement, project construction, interconnection, or any other factor), Seller’s detailed description of its proposed course of action to achieve the missed Milestones and all subsequent Milestones, and the potential impact of the missed Milestones on achievement of the Commercial Operation Date in relation to the Guaranteed Commercial Operation Date. Delivery of a Remedial Action Plan shall not relieve Seller of its obligation to provide Remedial Action Plans with respect to any subsequent Milestones (when required under this Section 2.5), and to achieve the Guaranteed Commercial Operation Date in accordance with the terms of this Agreement. Subject to the provisions of Exhibit B, so long as Seller complies with its obligations under this Section

2.5, Seller shall not be considered in default of its obligations under this Agreement solely as a result of missing any Milestone.

2.6 Pre-Commercial Operation Actions. The Parties agree that, in order for Buyer to dispatch the Facility for its Commercial Operation Date, the Parties will have to perform certain of their Delivery Term obligations in advance of the Commercial Operation Date, including, without limitation, Seller’s delivery of an Availability Notice for the Commercial Operation Date, and Buyer’s delivery of a Dispatch Notice and nominating and scheduling the Facility for the Commercial Operation Date, in advance of the Commercial Operation Date. The Parties shall cooperate with each other in order for Buyer to be able to dispatch the Facility for the Commercial Operation Date.

ARTICLE 3

PURCHASE AND SALE

3.1 Product. Subject to the terms and conditions of this Agreement, during the Delivery Term, Buyer shall have the exclusive right to and shall purchase the Installed Capacity and Effective Capacity, as applicable, and all Product associated therewith. Seller shall operate the Facility and make available, charge and discharge, deliver, and sell the Product therefrom to Buyer when and as the Facility is available, subject to the terms and conditions of this Agreement, including the Operating Restrictions. Seller represents and warrants that it will deliver the Product to Buyer free and clear of all liens, security interests, claims and encumbrances. Seller shall not substitute or purchase any energy storage capacity, Energy, Ancillary Services or Capacity Attributes from any other energy storage resource or the market for delivery hereunder except as otherwise provided herein, nor shall Seller sell, assign or otherwise transfer any Product, or any portion thereof, to any third party other than to Buyer or the CAISO pursuant to this Agreement or as otherwise required by Law.

3.2 Discharging Energy. Subject to the terms and conditions of this Agreement, Seller commits to make available the Discharging Energy to Buyer during the Delivery Term, and Buyer shall have the exclusive rights to all such Discharging Energy, subject to the Operating Restrictions. Title to and risk of loss related to the Discharging Energy shall pass and transfer from Seller to Buyer at the Delivery Point.

3.3 Capacity Attributes. Seller shall request Full Capacity Deliverability Status for the Guaranteed Storage Capacity in the CAISO generator interconnection process. Seller shall use 694
26 commercially reasonable efforts to achieve the First Showing Month on a Full Capacity Deliverability Status or Interim Capacity Deliverability Status basis in the amount of the Guaranteed Storage Capacity by the RA Guarantee Date. As between Buyer and Seller, Seller shall be responsible for the cost and installation of any Network Upgrades associated with obtaining such Full Capacity Deliverability Status.
(a) From and after the RA Guarantee Date, and subject to Section 3.7, Seller grants, pledges, assigns and otherwise commits to Buyer all the Capacity Attributes from the Facility.
(b) If the Facility achieves the First Showing Month on an Interim Deliverability Status basis in an amount that is less than the Guaranteed Storage Capacity, for each Showing Month from that First Showing Month to the first Showing Month on a Full Capacity Deliverability Status basis, the Storage Payment shall be calculated in accordance with Exhibit C, Section (a).
(c) If the RA Guarantee Date occurs prior to the First Showing Month, Seller shall pay damages or provide Replacement RA to Buyer pursuant to Section 3.8 in the RA Deficiency Amount for each Showing Month from the RA Guarantee Date to the First Showing Month.
(d) From and after the First Showing Month and subject to Section 3.7, Seller shall take commercially reasonable administrative actions, including complying with all applicable registration and reporting requirements, and executing all documents or instruments necessary to enable Buyer to use all of the Capacity Attributes committed by Seller to Buyer pursuant to this Agreement. Seller shall promptly comply with all reasonable requests for information from the CPUC and all reasonable requests for information from Buyer necessary to demonstrate Buyer’s compliance with its RAR obligations with respect to the Facility.

3.4 Ancillary Services. Buyer shall have the exclusive rights to all Ancillary Services that the Facility is capable of providing during the Delivery Term consistent with the Operating Restrictions, with characteristics and quantities determined in accordance with the CAISO Tariff.

Seller shall operate and maintain the Facility throughout the Delivery Term so as to be able to provide Ancillary Services in accordance with the specifications set forth in the Facility’s initial CAISO Certification associated with the Installed Capacity, adjusted to reflect the Effective Capacity. Upon Buyer’s reasonable request, Seller shall submit the Facility for additional CAISO Certification so that the Facility may provide additional Ancillary Services that the Facility is, at the relevant time, actually physically capable of providing consistent with the definition of Ancillary Services herein and without modification of the Facility, provided that Buyer has agreed to reimburse Seller for any material costs Seller incurs in connection with conducting such additional CAISO Certification.

3.5 Resource Adequacy Failure.
(a) RA Deficiency Determination. For each RA Shortfall Month, Seller shall pay to Buyer as liquidated damages the RA Deficiency Amount, as set forth in Section 3.5(b), 695
696
28 (b) If Seller reasonably anticipates the need to incur out-of-pocket expenses in excess of the Compliance Expenditure Cap in order to take any Compliance Action Seller shall provide Notice to Buyer of such anticipated out-of-pocket expenses. (c) Buyer will have sixty (60) days to evaluate such Notice (during which time period Seller is not obligated to take any Compliance Actions described in the Notice) and shall, within such time, either (1) agree to reimburse Seller for all or some portion of the costs that exceed the Compliance Expenditure Cap (such Buyer-agreed upon costs, the “Accepted Compliance Costs”), or (2) waive Seller’s obligation to take such Compliance Actions, or any part thereof for which Buyer has not agreed to reimburse Seller. If Buyer does not respond to a Notice given by Seller under this Section 3.7 within sixty (60) days after Buyer’s receipt of same, Buyer shall be deemed to have waived its rights to require Seller to take the Compliance Actions that are the subject of the Notice, and Seller shall have no further obligation to take, and no liability for any failure to take, these Compliance Actions for the remainder of the Contract Term. (d) If Buyer agrees to reimburse Seller for the Accepted Compliance Costs, then Seller shall take such Compliance Actions covered by the Accepted Compliance Costs as agreed upon by the Parties and Buyer shall reimburse Seller for Seller’s actual costs to effect the Compliance Actions, not to exceed the Accepted Compliance Costs, within sixty (60) days from the time that Buyer receives an invoice and documentation of such costs from Seller. (e) If a change in Laws prevents Seller from complying with its obligations under this Agreement with respect to obtaining, maintaining, conveying or effectuating Buyer’s use of Capacity Attributes pursuant to Sections 3.1, 3.3, 3.5, or 3.6, and it is not possible to overcome the Change in Law through Compliance Actions or the expenditure of money, then, except as otherwise provided or contemplated in this Agreement with respect to how a change in Laws will be addressed, and the definition of Guaranteed RA Amount, Seller shall provide Notice to Buyer of such change in Laws and the consequences for Seller’s performance hereunder, the Parties shall enter into negotiations to make the minimum changes to this Agreement necessary to make this Agreement capable of being performed and administered consistent with such change in Laws, while attempting to preserve to the maximum extent possible the benefits, burdens, and obligations set forth in this Agreement as of the Effective Date, provided that if no such agreement is achieved resolution shall be determined in accordance with Article 15.

ARTICLE 4

OBLIGATIONS AND DELIVERIES

4.1 Delivery. Subject to the provisions of this Agreement, including Section 4.9(a), commencing on the Commercial Operation Date through the end of the Contract Term, Seller shall supply and deliver the Product to Buyer at the Delivery Point, and Buyer shall take delivery of the Product at the Delivery Point in accordance with the terms of this Agreement. Seller shall be responsible for paying or satisfying when due any costs or charges imposed in connection with the delivery of Discharging Energy to the Delivery Point, including any operation and maintenance charges imposed on Seller by the Participating Transmission Owner directly relating to the Facility’s operations. Buyer shall be responsible for all costs, charges and penalties, if any, imposed in connection with the delivery of Charging Energy to the Delivery Point (including the cost of Charging Energy itself) and delivery of Discharging Energy at and after the Delivery Point, 697
29 including without limitation transmission costs and transmission line losses and imbalance charges. The Charging Energy and Discharging Energy will be scheduled to the CAISO by Buyer in accordance with Exhibit D.

4.2 Interconnection. Seller shall be responsible for all costs of interconnecting the Facility to the Interconnection Point. During the Delivery Term, Seller shall have and maintain interconnection capacity available or allocable to the Facility that is no less (and no greater) than the Dedicated Interconnection Capacity throughout the Delivery Term.

4.3 Seasonal Availability and Efficiency.
(a) During the Delivery Term, the Facility shall maintain a Seasonal Availability during each Seasonal Period of no less than the Guaranteed Seasonal Availability, which Seasonal Availability shall be calculated in accordance with Exhibit P. If the Seasonal Availability during any Seasonal Period is less than the applicable Guaranteed Seasonal Availability for such Seasonal Period, then Seller shall owe liquidated damages pursuant to Exhibit C, which, except as set forth in Section 11.1(b)(iii) and (iv), shall be Buyer’s sole and exclusive remedy in respect of Seller’s failure to achieve the Guaranteed Seasonal Availability. (b) During the Delivery Term, the Facility shall maintain an Efficiency Rate of no less than the applicable Guaranteed Efficiency Rate, which Efficiency Rate shall be calculated in accordance with a Capacity Test conducted pursuant to Exhibit O. If the Efficiency Rate during any month is less than the applicable Guaranteed Efficiency Rate, then Seller shall owe liquidated damages pursuant to Exhibit C, which, except as set forth in Section 11.1(b)(v), shall be Buyer’s sole and exclusive remedy in respect of Seller’s failure to maintain the applicable Guaranteed Efficiency Rate.

4.4 Facility Testing.
(a) Capacity Tests. Prior to the Commercial Operation Date, Seller shall schedule and complete a Commercial Operation Capacity Test in accordance with Exhibit O.

Thereafter, Seller and Buyer shall have the right to run additional Capacity Tests in accordance with Exhibit O.
(i) Buyer shall have the right to send one or more representative(s) to witness all Capacity Tests. Alternatively, to the extent that any Capacity Tests are done remotely, and no representatives are needed on site, Seller shall arrange for both Parties to have access to all data and other information arising out of such tests. Buyer shall be responsible for all costs, expenses and fees payable or reimbursable to its representative(s) witnessing any Capacity Test.

Any such representative(s) of Buyer shall adhere to the safety and security procedures of Seller.

Buyer shall indemnify and hold Seller harmless for any losses or claims for personal injury, death or property damage to the Facility or Site to the extent caused by Buyer, its authorized agents, employees, and inspectors, during any such access.
(ii) Any testing of the Facility requested by Buyer, and all required annual tests pursuant to Section B of the section headed “Capacity Test Notice and Frequency” in Exhibit O, shall be deemed Buyer-instructed dispatches of the Facility (“Buyer Dispatched Test”). For any Buyer Dispatched Test, Buyer shall (1) pay for and be responsible for providing 698
30 all associated Charging Energy, (2) be liable for all CAISO costs and charged for associated Charging Energy, and (3) be entitled to any CAISO revenues associated with associated Discharging Energy.
(iii) For any Capacity Tests, or other operational tests initiated by Seller (“Seller Initiated Test”), including all tests conducted prior to Commercial Operation, any Commercial Operation Capacity Test, any Capacity Test conducted if the Effective Storage Capacity immediately prior to such Capacity Test is below of the Installed Storage Capacity, any test required by CAISO, and other Seller-requested discretionary tests or dispatches, Seller shall be (A) liable for all CAISO costs and charges for associated Charging Energy, and (B) entitled to any CAISO revenues associated with Discharging Energy. (iv) No Charging Notices or Discharging Notices shall be issued during any Seller Initiated Test. Charging Notices or Discharging Notices may be issued during a Buyer Dispatched Test as reasonably necessary to implement the applicable test. The Facility shall be deemed unavailable during any Seller Initiated Test. Any hour or partial hour when a Buyer Dispatched Test occurs shall be deemed an Excused Hour for the purposes of calculating the Seasonal Availability.
(v) For any Seller Initiated Test, other than Capacity Tests required by Exhibit O for which there is a stated notice requirement, Seller shall notify Buyer no later than prior thereto (or any shorter period reasonably acceptable to Buyer consistent with Prudent Operating Practices).
(vi) Following each Capacity Test, Seller shall submit a testing report in accordance with Exhibit O. If the actual capacity or efficiency rate determined pursuant to a Capacity Test varies from the then-current Effective Capacity and/or Efficiency Rate, as applicable, then the actual capacity and/or efficiency rate determined pursuant to such Capacity Test shall become the new Effective Capacity and/or Efficiency Rate, as applicable, at the beginning of the day following the completion of the test for all purposes under this Agreement until a revised Effective Capacity and/or Efficiency Rate, as applicable, is determined pursuant to a subsequent Capacity Test.
(b) Additional Testing. Seller shall conduct such additional testing as necessary to ensure the Facility is functioning properly and the Facility is able to respond to Dispatch Notices pursuant to Section 4.6(b).

4.5 Testing Costs and Revenues.
(a) Buyer shall be responsible for paying for all Charging Energy and shall be entitled to all CAISO revenues associated with a Buyer Dispatched Test. Seller shall be responsible for paying for all Energy to charge the Facility and shall be entitled to all CAISO revenues associated with a Seller Initiated Test. Buyer shall pay to Seller, in the month following Buyer’s receipt of such CAISO revenues and otherwise in accordance with Exhibit C, all applicable CAISO revenues received by Buyer and associated with the discharge Energy associated with such Seller Initiated Test.
699
31 (b) Buyer shall be responsible for all costs, expenses and fees payable or reimbursable to its representative(s) witnessing any Facility test. (c) Except as set forth in Sections 4.5(a) and (b), all other costs of any testing of the Facility shall be borne by Seller.

4.6 Facility Operations.
(a) Seller shall operate the Facility in accordance with Prudent Operating Practices.
(b) During the Delivery Term, Seller shall maintain SCADA Systems, communications links, and other equipment necessary to receive automated Dispatch Notices consistent with CAISO protocols and practice (“Automated Dispatches”). In the event of the failure or inability of the Facility to receive Automated Dispatches, Seller shall use all commercially reasonable efforts to repair or replace the applicable components as soon as reasonably possible, and if there is any material delay in such repair or replacement, Seller shall provide Buyer with a written plan of all actions Seller plans to take to repair or replace such components for Buyer’s review and comment. During any period during which the Facility is not capable of receiving or implementing Automated Dispatches, Seller shall implement back-up procedures consistent with the CAISO Tariff and CAISO protocols to enable Seller to receive and implement non-automated Dispatch Notices (“Alternative Dispatches”). (c) Seller shall maintain a daily operations log for the Facility which shall include but not be limited to information on Energy charging and discharging, electricity consumption and efficiency (if applicable), availability, outages, changes in operating status, inspections and any other significant events related to the operation of the Facility. Information maintained pursuant to this Section 4.6(c) shall be provided to Buyer within fifteen (15) days of Buyer’s request.
(d) Seller shall maintain accurate records with respect to all Capacity Tests. (e) Seller shall maintain and make available to Buyer records, including logbooks, demonstrating that the Facility is operated in accordance with Prudent Operating Practices. Seller shall comply with all reporting requirements and permit on-site audits, investigations, tests and inspections permitted or required under any Prudent Operating Practices.

4.7 Dispatch Notices. Buyer shall have the right to dispatch the Facility seven (7) days per week and twenty-four (24) hours per day (including holidays), by providing Dispatch Notices, subject to availability of the Facility and the requirements and limitations set forth in this Agreement, including the Operating Restrictions. Subject to the Operating Restrictions, each Dispatch Notice shall be effective unless and until such Dispatch Notice is modified by the CAISO, Buyer or Buyer’s SC. If Automated Dispatches are not possible for reasons beyond Buyer’s control, Alternative Dispatches may be provided pursuant to Section 4.6(b).

4.8 Facility Unavailability to Receive Dispatch Notices. To the extent the Facility is unable to receive or respond to Dispatch Notices either through Automated Dispatches or Alternative Dispatches during any Settlement Interval or Settlement Period, then as an exclusive 700
32 remedy, the time period corresponding to such Settlement Interval or Settlement Period shall be deemed unavailable for purposes of calculating the Seasonal Availability except to the extent that the Facility is unable to receive or respond to Dispatch Notices due to any circumstances at the high-voltage side of the Delivery Point or beyond that point, or during any Excused Hour.

4.9 Energy Management.
(a) Charging Generally. Upon receipt of a valid Charging Notice, Seller shall take all action necessary to deliver the Charging Energy to the Facility from the Delivery Point.

Seller shall maintain, repair or replace equipment in Seller’s possession or control used to deliver the Charging Energy from the Delivery Point to the Facility. Except as otherwise expressly set forth in this Agreement, Buyer shall be responsible for paying all costs and charges of delivering the Charging Energy to the Delivery Point, including all CAISO costs and charges associated with Charging Energy.
(b) Charging Notices. Buyer shall have the right to charge the Facility seven (7) days per week and twenty-four (24) hours per day (including holidays) during the Delivery Term, by causing Charging Notices to be issued, subject to availability of the Facility and the requirements and limitations set forth in this Agreement, including the Operating Restrictions.

Subject to compliance with the Operating Restrictions, each Charging Notice issued in accordance with this Agreement shall be effective unless and until Buyer, Buyer’s SC or CAISO modifies such Charging Notice by providing Seller with an updated Charging Notice. Buyer shall be responsible for issuing all Charging Notices necessary or required in connection with the Must Offer Obligations and all CAISO charges and penalties for failing to comply with the Must Offer Obligation.
(c) No Unauthorized Charging. Seller shall not charge the Facility during the Delivery Term other than pursuant to a valid Charging Notice (it being understood that Seller may adjust a Charging Notice to the extent necessary to maintain compliance with the Operating Restrictions), or in connection with a Buyer Initiated Test or a Seller Initiated Test (including Facility maintenance or a Capacity Test), or pursuant to a notice from the CAISO, Participating Transmission Owner, or any Governmental Authority. If, during the Delivery Term, Seller charges the Facility (i) to a Stored Energy Level greater than the Stored Energy Level provided for in a Charging Notice, or (ii) in violation of the first sentence of this Section 4.9(c), then (i) Seller shall pay to Buyer all Energy costs associated with such charging of the Facility, and (ii) Buyer shall be entitled to discharge such Energy and shall be entitled to all of the benefits (including Product) associated with such discharge.
(d) Discharging Notices. Buyer shall have the right to discharge the Facility seven (7) days per week and twenty-four (24) hours per day (including holidays) during the Delivery Term, by causing Discharging Notices to be issued, subject to availability of the Facility and the requirements and limitations set forth in this Agreement, including the Operating Restrictions. Each Discharging Notice issued in accordance with this Agreement shall be effective unless and until Buyer, Buyer’s SC or the CAISO modifies such Discharging Notice by providing the Facility with an updated Discharging Notice. Buyer shall be responsible for issuing all Discharging Notices necessary or required in connection with the Must Offer Obligations and all CAISO charges and penalties for failing to comply with the Must Offer Obligation. 701
33 (e) No Unauthorized Discharging. Seller shall not discharge the Facility during the Delivery Term other than pursuant to a valid Discharging Notice (it being understood that Seller may adjust a Discharging Notice to the extent necessary to maintain compliance with the Operating Restrictions), or in connection with a Seller Initiated Test (including Facility maintenance or a Storage Capacity Test), or pursuant to a notice from the CAISO, Participating Transmission Owner, or any Governmental Authority.
(f) Unauthorized Discharges. If, during the Contract Term, Seller (i) discharges the Facility other than as provided for in the Discharging Notice or (ii) discharges the Facility in violation of Section 4.5(e), then (i) Seller shall be responsible for two (2) times the amount of all Energy costs associated with, and shall hold Buyer harmless from, and reimburse Buyer for two (2) times the amount of all actual losses and costs that Buyer incurs as a result of , such discharging of the Facility, and (ii) Buyer shall be entitled to all of the benefits (including Product) associated with such discharge.
(g) CAISO Dispatches. During the Delivery Term, CAISO Dispatches shall have priority over any Charging Notice or Discharging Notice issued by Buyer or Buyer’s SC, and Seller shall have no liability for violation of this Section 4.9 or any Charging Notice or Discharging Notice if and to the extent such violation is caused by Seller’s compliance with any CAISO Dispatch. During any time interval during the Delivery Term in which the Facility is capable of responding to a CAISO Dispatch, but the Facility deviates from a CAISO Dispatch or Seller negligently or intentionally fails to accurately communicate to Buyer the Facility’s availability, Seller shall be responsible for all CAISO charges and penalties resulting from such deviations (in addition to any Buyer remedy related to overcharging of the Facility as set forth in Section 4.9(c)). (h) Pre-Commercial Operation Date Period. Prior to the Commercial Operation Date, Buyer shall have no rights to issue or cause to be issued Charging Notices or Discharging Notices, and Seller shall have exclusive rights to charge and discharge the Facility. (i) Curtailments. Notwithstanding anything in this Agreement to the contrary, during any Settlement Interval, Curtailment Orders applicable to such Settlement Interval shall have priority over any Dispatch Notices applicable to such Settlement Interval, and Seller shall have no liability for violation of this Agreement or any Dispatch Notice if and to the extent such violation is caused by Seller’s compliance with any Curtailment Order or other instruction or direction from a Governmental Authority or the Participating Transmission Owner. Buyer shall have the right, but not the obligation, to provide Seller with updated Dispatch Notices during any Curtailment Order, subject to availability of the Facility and the requirements and limitations set forth in this Agreement, including the Operating Restrictions. (j) Station Use. Notwithstanding anything to the contrary in this Agreement, the Parties acknowledge (i) Seller is responsible for providing all Energy to serve Station Use (including paying the cost of any Energy used to serve Station Use during periods in which the Facility is not charging or discharging pursuant to a Charging Notice or Discharging Notice), (ii) Energy supplied from Charging Energy or Discharging Energy during periods in which the Facility is charging or discharging pursuant to a Charging Notice or Discharging Notice shall not be considered Station Use, (iii) Station Use may be supplied over the same circuit as Charging Energy and Discharging Energy, and (iv) Seller shall indemnify and hold harmless Buyer from any and 702
703
35 Planned Outages to periods of the day when Seller does not reasonably believe the Facility will be dispatched. Within twenty (20) Business Days after its receipt of an Outage Schedule, Buyer shall give Notice to Seller of any reasonable request for changes to the Outage Schedule, and Seller shall, consistent with Prudent Operating Practices, accommodate Buyer’s requests regarding the timing of any Planned Outage. Seller shall deliver to Buyer the final Outage Schedule no later than ten (10) days after receiving Buyer’s comments.
(ii) If reasonably required in accordance with Prudent Operating Practices, Seller shall have the right, on no less than ninety (90) days advance Notice to Buyer, to propose changes to the Outage Schedule developed pursuant to Section 4.12(a)(i); provided, Seller shall schedule all Planned Outages within the time period determined by the CAISO for the Facility, as a Resource Adequacy Resource that is subject to the Availability Standards, to qualify for an “Approved Maintenance Outage” under the CAISO Tariff and Seller shall reimburse Buyer for any cost Buyer incurs in connection therewith (including replacement Capacity Attributes as required by the CAISO). Buyer may provide comments no later than ten (10) days after receiving Seller’s Notice of proposed changes to the Outage Schedule and shall permit any changes if doing so would not have a material adverse impact on Buyer and Seller agrees to reimburse Buyer for any costs or charges associated with such changes.
(b) No Planned Outages During Summer Months. Except as scheduled by the Parties under Section 4.12(a)(ii), during the Summer Season of each Contract Year, Seller shall not schedule any non-emergency outage or maintenance that reduces the Available Capacity of the Facility, unless (i) such outage or maintenance is required to avoid an emergency or damage to the Facility or its Interconnection Facilities, (ii) such outage or maintenance is necessary to maintain equipment warranties or is otherwise required by the equipment manufacturer and cannot be scheduled outside the Summer Season of each Contract Year, (iii) such outage or maintenance occurs in connection with any Force Majeure Event, (iv) such outage or maintenance is required by Law or by the CAISO Tariff or the tariffs of the Participating Transmission Owner, or (v) the Parties agree to such outage or maintenance in writing. (c) Planned Outage Timing. To the extent commercially reasonable, Seller shall schedule maintenance outages (i) within a single month, rather than across multiple months, (ii) during periods in which CAISO does not require resource substitution or replacement (if such periods are available), and (iii) otherwise in a manner to avoid reductions in the Resource Adequacy Benefits available from the Facility to Buyer. (d) Notice of Unplanned Outages Seller shall notify Buyer’s Scheduling Coordinator no later than ten (10) minutes following the occurrence of an Unplanned Outage, or if Seller has knowledge that an Unplanned Outage will occur, within twenty (20) minutes of determining that such Unplanned Outage will occur. Seller shall relay outage information to Buyer as required by the CAISO Tariff within twenty (20) minutes of the Unplanned Outage. Seller shall communicate to Buyer the estimated time of return of the Facility as soon as practical after Seller has knowledge thereof.
(e) Inspection. In the event of an Unplanned Outage, Buyer shall have the option to inspect the Facility and all records relating thereto on any Business Day reasonably convenient for Seller and at a reasonable time and Seller shall reasonably cooperate with Buyer 704
36 during any such inspection. Buyer shall comply with Seller’s safety and security rules and instructions during any inspection and shall not interfere with work on or operation of the Facility. (f) Reports of Outages. Seller shall promptly prepare and provide to Buyer, all reports of Unplanned Outages or Planned Outages that Buyer may reasonably require for the purpose of enabling Buyer to comply with CAISO requirements or any applicable Laws. Seller shall also report all Unplanned Outages or Planned Outages in the Daily Operating Report.

ARTICLE 5

TAXES, GOVERNMENTAL COSTS

5.1 Allocation of Taxes and Charges. Seller shall pay or cause to be paid all Taxes on or with respect to the Facility or on or with respect to the sale and making available of Product to Buyer, that are imposed on Product prior to its delivery to Buyer at the time and place contemplated under this Agreement (other than withholding or other Taxes imposed on Buyer’s income, revenue, receipts or employees). Buyer shall pay or cause to be paid all Taxes on or with respect to the delivery to and purchase by Buyer of Product that are imposed on Product at and after its delivery to Buyer at the time and place contemplated under this Agreement (other than withholding or other Taxes imposed on Seller’s income, revenue, receipts or employees) or on Charging Energy prior to its delivery to Seller. If a Party is required to remit or pay Taxes that are the other Party’s responsibility hereunder, such Party shall promptly pay the Taxes due and then seek and receive reimbursement from the other for such Taxes.

5.2 Cooperation. Each Party shall use reasonable efforts to implement the provisions of and administer this Agreement in accordance with the intent of the Parties to minimize all Taxes, so long as no Party is materially adversely affected by such efforts. The Parties shall cooperate to minimize Tax exposure; provided, neither Party shall be obligated to incur any financial or operational burden to reduce Taxes for which the other Party is responsible hereunder without receiving due compensation therefor from the other Party. All Product delivered by Seller to Buyer hereunder shall be a sale made at wholesale, with Buyer reselling such Product.

ARTICLE 6

MAINTENANCE AND REPAIR OF THE FACILITY

6.1 Maintenance of the Facility. Seller shall comply with Law and Prudent Operating Practice relating to the operation and maintenance of the Facility, the sale of Product, and the disposal or recycling of any equipment associated with the Facility, including batteries.

6.2 Maintenance of Health and Safety. Seller shall take reasonable safety precautions with respect to the operation, maintenance, repair and replacement of the Facility. If Seller becomes aware of any circumstances relating to the Facility that create an imminent risk of damage or injury to any Person or any Person’s property, Seller shall take prompt, reasonable action to prevent such damage or injury and shall give Buyer’s emergency contact identified in Exhibit N Notice of such condition. Such action may include disconnecting and removing all or a portion of the Facility or suspending the supply of Discharging Energy to the Delivery Point.

6.3 Shared Facilities. The Parties acknowledge and agree that certain of the Shared Facilities and Interconnection Facilities, and Seller’s rights and obligations under the 705
37 Interconnection Agreement, may be subject to certain shared facilities and/or co-tenancy agreements to be entered into among Seller, the Participating Transmission Owner, Seller’s Affiliates, and/or third parties. Seller agrees that any agreements regarding Shared Facilities (i) shall permit Seller to perform or satisfy, and shall not purport to limit, Seller’s obligations hereunder, including providing interconnection capacity for the Facility’s sole use in the amount of the Dedicated Interconnection Capacity, (ii) shall provide for separate metering and a separate CAISO Resource ID for the Facility, (iii) shall provide that any other generating or energy storage facilities not included in the Facility but using Shared Facilities shall not be included within the Facility’s CAISO Resource ID(s); and (iv) shall provide that any curtailment of the full capacity of Shared Facilities that is ordered by Participating Transmission Owner that Seller and its Affiliates have discretion to allocate across generating or energy storage facilities using the Shared Facilities shall not be allocated to the Facility in an amount that is higher than Buyer’s pro rata portion of the total capacity of all generating or energy storage facilities using the Shared Facilities.

ARTICLE 7

METERING

7.1 Metering. Seller shall measure the amount of Charging Energy and Facility Energy using the Facility Meter, which will be subject to adjustment in accordance with applicable CAISO meter requirements and Prudent Operating Practices, including to account for Electrical Losses.

The Facility Meter will be operated pursuant to applicable CAISO-approved calculation methodologies and maintained at Seller’s cost. If Seller elects to submit a SQMD Plan for the Facility, then the Facility Meter(s) will be programmed, operated and maintained pursuant to the applicable CAISO-approved SQMD Plan for the Facility, at Seller’s sole cost, throughout the period to which the SQMD Plan applies. Seller shall promptly provide to Buyer a copy of any CAISO-approved SQMD Plan and any modifications thereto and notice of any termination or withdrawal thereof. Subject to meeting any applicable CAISO requirements, the Facility Meter shall be programmed to adjust for all Electrical Losses from such meters to the Delivery Point in a manner subject to Buyer’s prior written approval, not to be unreasonably withheld. Metering shall be consistent with the Metering Diagram set forth as Exhibit R, a final version of which shall be provided to Buyer at least thirty (30) days prior to the Commercial Operation Date, as may also be revised to be consistent with any CAISO-approved SQMD Plan. Each meter shall be kept under seal, such seals to be broken only when the Facility Meters are to be tested, adjusted, modified or relocated. In the event Seller breaks a seal, Seller shall notify Buyer as soon as practicable. In addition, Seller hereby agrees to provide all Facility Meter data to Buyer in a form reasonably acceptable to Buyer, and consents to Buyer obtaining from CAISO the CAISO meter data directly relating to the Facility and all inspection, testing and calibration data and reports, to the extent such meter data and related meters are not the subject of a CAISO-approved SQMD Plan. Seller and Buyer, or Buyer’s Scheduling Coordinator, shall cooperate to allow both Parties to retrieve the meter reads from the CAISO Market Results Interface-Settlements (MRI-S) web and/or directly from the CAISO meter(s) at the Facility, to the extent such meter data and related meters are not the subject of a CAISO-approved SQMD Plan.

7.2 Meter Verification. Seller shall test the Facility Meter at least annually and more frequently than annually if Buyer or Seller reasonably believe there may be a meter malfunction.

The tests shall be conducted by independent third parties qualified to conduct such tests. Buyer shall be notified seven (7) days in advance of such tests and have a right to be present during such 706
38 tests. If a Facility Meter is inaccurate, it shall be promptly repaired or replaced. If a meter is inaccurate by more than and it is not known when the Facility Meter inaccuracy commenced (if such evidence exists, then such date will be used to adjust prior invoices), then the invoices covering the period of time since the last Facility Meter test shall be adjusted for the amount of the inaccuracy on the assumption that the inaccuracy persisted during one-half of such period if such adjustments are accepted by CAISO; provided, such period may not exceed twelve (12) months.

ARTICLE 8
INVOICING AND PAYMENT; CREDIT

8.1 Invoicing. Seller shall use commercially reasonable efforts to deliver an invoice to Buyer for Product within ten (10) days after the end of the prior monthly delivery period. Each invoice shall reflect (a) records of metered data, including (i) CAISO metering and transaction data sufficient to document and verify the amount of Product delivered by the Facility for any Settlement Period during the preceding month, including the amount of Charging Energy, Discharging Energy, and the amount of Replacement RA delivered to Buyer (if any) and (ii) Seller’s records of metered data, including data showing a calculation of the Monthly Capacity Payment and other relevant data for the prior month; and (b) be in a format reasonably specified by Buyer, covering the Product provided in the preceding month determined in accordance with the applicable provisions of this Agreement. Buyer shall, and shall cause its Scheduling Coordinator to, provide Seller with all reasonable access (including, in real time, to the maximum extent reasonably possible) to any records, including invoices or settlement data from the CAISO, forecast data and other information, all as may be necessary from time to time for Seller to prepare and verify the accuracy of all invoices. The invoice shall be delivered by electronic mail in accordance with Exhibit N.

8.2 Payment. Buyer shall make payment to Seller of Monthly Capacity Payments for Product by wire transfer or ACH payment to the bank account provided on each monthly invoice.

Buyer shall pay undisputed invoice amounts within thirty (30) days of Buyer’s receipt of Seller’s invoices; provided, if such due date falls on a weekend or legal holiday, such due date shall be the next Business Day. Payments made after the due date will be considered late and will bear interest on the unpaid balance. If the amount due is not paid on or before the due date or if any other payment that is due and owing from one Party to another is not paid on or before its applicable due date, a late payment charge shall be applied to the unpaid balance and shall be added to the next billing statement. Such late payment charge shall be calculated based on an annual Interest Rate equal to the prime rate published on the date of the invoice in The Wall Street Journal (or, if The Wall Street Journal is not published on that day, the next succeeding date of publication), plus (the “Interest Rate”). If the due date occurs on a day that is not a Business Day, the late payment charge shall begin to accrue on the next succeeding Business Day.

8.3 Books and Records. To facilitate payment and verification, each Party shall maintain all books and records necessary for billing and payments, including copies of all invoices under this Agreement, for a period of at least two (2) years or as otherwise required by Law. Upon fifteen (15) days’ Notice to the other Party, either Party shall be granted reasonable access to the accounting books and records within the possession or control of the other Party pertaining to all invoices generated pursuant to this Agreement. Seller acknowledges that in accordance with 707
39 California Government Code Section 8546.7, Seller may be subject to audit by the California State Auditor with regard to Seller’s performance of this Agreement because the compensation under this Agreement exceeds $10,000.

8.4 Payment Adjustments; Billing Errors. Payment adjustments shall be made if Buyer or Seller discovers there have been good faith inaccuracies in invoicing that are not otherwise disputed under Section 8.5 or an adjustment to an amount previously invoiced or paid is required due to a correction of data by the CAISO, or there is determined to have been a Facility Meter inaccuracy sufficient to require a payment adjustment. If the required adjustment is in favor of Buyer, Buyer’s next monthly payment shall be credited in an amount equal to the adjustment.

If the required adjustment is in favor of Seller, Seller shall add the adjustment amount to Buyer’s next monthly invoice. Adjustments in favor of either Buyer or Seller shall bear interest, until settled in full, in accordance with Section 8.2, accruing from the date on which the adjusted amount should have been due.

8.5 Billing Disputes. A Party may, in good faith, dispute the correctness of any invoice or any adjustment to an invoice rendered under this Agreement or adjust any invoice for any arithmetic or computational error within twelve (12) months of the date the invoice, or adjustment to an invoice, was rendered. In the event an invoice or portion thereof, or any other claim or adjustment arising hereunder, is disputed, payment of the undisputed portion of the invoice shall be required to be made when due. Any invoice dispute or invoice adjustment shall be in writing and shall state the basis for the dispute or adjustment. Payment of the disputed amount shall not be required until the dispute is resolved. Upon resolution of the dispute, any required payment shall be made within five (5) Business Days of such resolution along with interest accrued at the Interest Rate from and including the original due date to but excluding the date paid. Inadvertent overpayments shall be returned via adjustments in accordance with Section 8.4. Any dispute with respect to an invoice is waived if the other Party is not notified in accordance with this Section 8.5 within twelve (12) months after the invoice is rendered or subsequently adjusted, except to the extent any misinformation was from a third party not affiliated with any Party and such third party corrects its information after the twelve-month period. If an invoice is not rendered within twelve (12) months after the close of the month during which performance occurred, the right to payment for such performance is waived.

8.6 Netting of Payments. The Parties hereby agree that they shall discharge mutual debts and payment obligations due and owing to each other with respect to this Agreement on the same date through netting, in which case all amounts owed by each Party to the other Party for the purchase and sale of Product during the monthly billing period under this Agreement or otherwise arising out of this Agreement, including any related damages calculated pursuant to Exhibits B and P, interest, and payments or credits, shall be netted so that only the excess amount remaining due shall be paid by the Party who owes it.

8.7 Seller’s Development Security. To secure its obligations under this Agreement, Seller shall (a) deliver the Development Security to Buyer in an amount equal to the amount set forth for the Development Security on the Cover Sheet within thirty (30) days of the Execution Date. However, the Parties acknowledge and agree that (i) development security in the amount required under this Agreement of five million four hundred dollars ($5,400,000) was previously provided to Buyer under the Prior ESA and is currently being held by Buyer, and (ii) such 708
40 previously provided development security may be applied towards and shall fulfill Seller’s obligation to provide the Development Security required under this Agreement, provided that Seller shall provide, and Buyer shall have the right to require, within thirty (30) days of the Execution Date, any conforming changes or amendments to the previously provided development security currently being held by Buyer, including to reflect the new Seller and the new name of this Agreement. Seller shall maintain the Development Security in full force and effect until Buyer is required to return such Development Security hereunder. Upon the earlier of (a) Seller’s delivery of the Performance Security (unless Seller elects to use the Development Security to meet a portion of the Performance Security), or (b) sixty (60) days after termination of this Agreement, Buyer shall return the Development Security to Seller, less the amounts drawn in accordance with this Agreement. If the Development Security is a Letter of Credit and the issuer of such Letter of Credit (i) fails to maintain the minimum Credit Rating specified in the definition of Letter of Credit, (ii) indicates its intent not to renew such Letter of Credit and such Letter of Credit expires prior to the Commercial Operation Date, or (iii) fails to honor Buyer’s properly documented request to draw on such Letter of Credit by such issuer, Seller shall have ten (10) Business Days to either post cash or deliver a substitute Letter of Credit that meets the requirements set forth in the definition of Development Security. Notwithstanding anything to the contrary in this Section

8.7 or elsewhere in this Agreement, Seller shall have no replenishment obligation with respect to the Development Security.

8.8 Seller’s Performance Security. To secure its obligations under this Agreement, Seller shall deliver Performance Security to Buyer on or before the Commercial Operation Date.

Seller may elect to apply the Development Security toward the Performance Security. If the Performance Security is not in the form of cash or Letter of Credit, it shall be substantially in the form of Guaranty set forth in Exhibit L. Seller shall maintain the Performance Security in full force and effect, and Seller shall within ten (10) Business Days after any draw thereon replenish the Performance Security in the event Buyer collects or draws down any portion of the Performance Security for any reason permitted under this Agreement other than to satisfy a Termination Payment (provided, however, that the total amount of any replenishments shall not exceed two (2) times the amount of the original Performance Security), until the following have occurred: (a) the Delivery Term has expired or terminated early; and (b) all payment obligations of Seller due and payable under this Agreement, including compensation for penalties, Termination Payment, indemnification payments or other damages are paid in full (whether directly or indirectly such as through set-off or netting). Following the occurrence of both events, Buyer shall promptly return to Seller the unused portion of the Performance Security. If the Performance Security is a Letter of Credit and the issuer of such Letter of Credit (i) fails to maintain the minimum Credit Rating set forth in the definition of Letter of Credit, (ii) indicates its intent not to renew such Letter of Credit and such Letter of Credit expires prior to the Commercial Operation Date, or (iii) fails to honor Buyer’s properly documented request to draw on such Letter of Credit by such issuer, Seller shall have ten (10) Business Days to either post cash or deliver a substitute Letter of Credit that meets the requirements set forth in the definition of Performance Security. For avoidance of doubt, the limit on Seller’s obligation to replenish the Performance Security shall not be construed as a cap on Seller’s liabilities under this Agreement.

8.9 First Priority Security Interest in Cash or Cash Equivalent Collateral. To secure its obligations under this Agreement, and until released as provided herein, each Party (“Party A”) hereby grants to the other Party (“Party B”) a present and continuing first-priority 709
710
42 Commission.
711
43 ARTICLE 9

NOTICES

9.1 Addresses for the Delivery of Notices. Any Notice required, permitted, or contemplated hereunder shall be in writing, shall be addressed to the Party to be notified at the address set forth in Exhibit N or at such other address or addresses as a Party may designate for itself from time to time by Notice hereunder.

9.2 Acceptable Means of Delivering Notice. Each Notice required, permitted, or contemplated hereunder shall be deemed to have been validly served, given or delivered as follows: (a) if sent by United States mail with proper first class postage prepaid, three (3) Business Days following the date of the postmark on the envelope in which such Notice was deposited in the United States mail; (b) if sent by a regularly scheduled next Business Day delivery carrier with 712
44 delivery fees either prepaid or an arrangement with such carrier made for the payment of such fees, the next Business Day after the same is delivered by the sending Party to such carrier; (c) if sent by electronic communication (including electronic mail or other electronic means) and if concurrently with the transmittal of such electronic communication the sending Party provides a copy of such electronic Notice by hand delivery or next Business Day delivery carrier, at the time indicated by the time stamp upon delivery; or (d) if delivered in person, upon receipt by the receiving Party. Notwithstanding the foregoing, invoices sent pursuant to Section 8.1 and Notices of outages or other scheduling or dispatch information or requests may be sent by electronic communication and shall be considered delivered upon successful completion of such transmission.

ARTICLE 10

FORCE MAJEURE

10.1 Definition.
(a) “Force Majeure Event” means any act or event that delays or prevents a Party from timely performing all or a portion of its obligations under this Agreement or from complying with all or a portion of the conditions under this Agreement if such act or event, despite the exercise of reasonable efforts, cannot be avoided by and is beyond the reasonable control (whether direct or indirect) of and without the fault or negligence of the Party relying thereon as justification for such delay, nonperformance, or noncompliance. (b) Without limiting the generality of the foregoing, so long as the following events, despite the exercise of reasonable efforts, cannot be avoided by, and are beyond the reasonable control (whether direct or indirect) of and without the fault or negligence of the Party relying thereon as justification for such delay, nonperformance or noncompliance, a Force Majeure Event may include: an act of God or the elements, such as flooding, lightning, hurricanes, tornadoes, or ice storms; hail; explosion; fire; volcanic eruption; flood; epidemic or pandemic (including COVID-19) and any quarantine related to any such epidemic or pandemic); landslide; mudslide; sabotage; terrorism; earthquake; or other cataclysmic events; an act of public enemy; war; blockade; civil insurrection; riot; civil disturbance; or strikes or other labor difficulties caused or suffered by a Party or any third party except as set forth below. (c) Notwithstanding the foregoing, the term “Force Majeure Event” does not include: (i) economic conditions that render a Party’s performance of this Agreement at the Contract Price unprofitable or otherwise uneconomic (including Buyer’s ability to buy the Product at a lower price, or Seller’s ability to sell Product at a higher price, than the Contract Price); (ii) Seller’s inability to obtain permits or approvals of any type for the construction, operation, or maintenance of the Facility; (iii) the inability of a Party to make payments when due under this Agreement, unless the cause of such inability is an event that would otherwise constitute a Force Majeure Event as described above that disables physical or electronic facilities necessary to transfer funds to the payee Party; (iv) a Curtailment Order, except to the extent such Curtailment Order is caused by a Force Majeure Event; (v) Seller’s inability to obtain sufficient labor, equipment, materials, or other resources to build or operate the Facility or the Shared Facilities except to the extent such inability is caused by a Force Majeure Event; (vi) a strike, work stoppage or labor dispute limited only to any one or more of Seller, Seller’s Affiliates, Seller’s contractors, 713
45 their subcontractors, or any other third party employed by Seller to work on the Facility; or (vii) any equipment failure, except if such equipment failure is caused by a Force Majeure Event.

10.2 No Liability If a Force Majeure Event Occurs. Neither Seller nor Buyer shall be liable to the other Party in the event it is prevented from performing its obligations hereunder in whole or in part due to a Force Majeure Event. The Party rendered unable to fulfill any obligation by reason of a Force Majeure Event shall take reasonable actions necessary to remove such inability with due speed and diligence. The obligation to use due speed and diligence shall not be interpreted to require resolution of labor disputes by acceding to demands of the opposition when such course is inadvisable in the discretion of the Party having such difficulty. Nothing herein shall be construed as permitting that Party to continue to fail to perform after said cause has been removed, provided the suspension of performance due to a claim of Force Majeure Event shall include any reasonable time period for mobilization/re-mobilization. Neither Party shall be considered in breach or default of this Agreement if and to the extent that any failure or delay in the Party’s performance of one or more of its obligations hereunder is caused by a Force Majeure Event. Notwithstanding the foregoing, the occurrence and continuation of a Force Majeure Event shall not (a) suspend or excuse the obligation of a Party to make any payments due hereunder, (b) suspend or excuse the obligation of Seller to achieve the Guaranteed Construction Start Date or the Guaranteed Commercial Operation Date beyond the extensions provided in Exhibit B, (c) limit Buyer’s right to declare an Event of Default pursuant to Section 11.1(b)(ii) and receive a Damage Payment as liquidated damages upon exercise of Buyer’s default rights pursuant to Section 11.2 (provided that promptly upon Buyer’s receipt of the Damage Payment, Buyer shall return to Seller the Development Security to the extent it did not comprise (i.e., was not used as) the Damage Payment), or (d) limit Buyer’s right to terminate the Agreement with respect to the Facility pursuant to Section 2 and/or Section 4 of Exhibit B and receive the Damage Payment as liquidated damages, provided that promptly upon Buyer’s receipt of the Damage Payment, Buyer shall return to Seller the Development Security to the extent it did not comprise (i.e., was not used as) the Damage Payment.

10.3 Notice. Within two (2) weeks of becoming aware of the impact of a Force Majeure Event, the non-performing Party shall provide the other Party with Notice in the form of a letter describing in detail the particulars of the occurrence giving rise to the Force Majeure claim. Failure to provide timely written Notice as described in the preceding sentence constitutes a waiver of a Force Majeure claim as to all periods prior to the delivery of a Notice. The suspension of performance due to a claim of Force Majeure must be of no greater scope and of no longer duration than is required by the Force Majeure.
714
715
47 (viii) with respect to any outstanding Letter of Credit provided for the benefit of the other Party that is not then required under this Agreement to be canceled or returned, the failure by such Party to provide for the benefit of such other Party either cash or a substitute Letter of Credit from a different issuer meeting the criteria set forth in the definition of Letter of Credit, or, in the case of the Performance Security required to be provided by Seller, a Guarantor meeting the requirements of this Agreement, in each case, in the amount required hereunder within ten (10) Business Days after such Party receives Notice of the occurrence of any of the following events:
(A) the issuer of the outstanding Letter of Credit shall fail to maintain a Credit Rating of at least A- by S&P or Fitch or A3 by Moody’s; (B) the issuer of such Letter of Credit becomes Bankrupt; (C) the issuer of the outstanding Letter of Credit shall fail to comply with or perform its obligations under such Letter of Credit and such failure shall be continuing after the lapse of any applicable grace period permitted under such Letter of Credit;
(D) the issuer of the outstanding Letter of Credit shall fail to honor a properly documented request to draw on such Letter of Credit;
(E) the issuer of the outstanding Letter of Credit shall disaffirm, disclaim, repudiate or reject, in whole or in part, or challenge the validity of, such Letter of Credit;
(F) such Letter of Credit fails or ceases to be in full force and effect at any time; or
(G) such Party shall fail to renew or cause the renewal of each outstanding Letter of Credit on a timely basis as provided in the relevant Letter of Credit and as provided in accordance with this Agreement, and in no event less than sixty (60) days prior to the expiration of the outstanding Letter of Credit. (b) with respect to Seller as the Defaulting Party, the occurrence of any of the following:
(i) if at any time, Seller delivers or attempts to deliver Energy to the Delivery Point that was not discharged by the Facility; (ii) the failure by Seller to (A) achieve Construction Start on or before the Guaranteed Construction Start Date, as such date may be extended by Seller’s payment of Daily Delay Damages pursuant to Section 1(b) of Exhibit B and/or a Development Cure Period pursuant to Section 4 of Exhibit B, or (B) achieve Commercial Operation on or before the Guaranteed Commercial Operation Date, as such date may be extended by Seller’s payment of Commercial Operation Delay Damages pursuant to Section 2(b) of Exhibit B and/or a Development Cure Period pursuant to Section 4 of Exhibit B; 716
717
718
719
51 by Buyer’s Event of Default would be difficult or impossible to determine and that the damages set forth in this Section 11.3(a)(ii) are a reasonable approximation of Seller’s harm or loss. (b) Termination Payment On or After the Commercial Operation Date. The payment owed by the Defaulting Party to the Non-Defaulting Party for a termination of this Agreement under Section 11.2 occurring after the Commercial Operation Date (“Termination Payment”) shall be the Settlement Amount plus any and all other amounts due to or from the Non-Defaulting Party (as of the Early Termination Date) netted into a single amount. The Non-Defaulting Party shall calculate, in a commercially reasonable manner, a Settlement Amount as of the Early Termination Date. Third parties supplying information for purposes of the calculation of Gains or Losses may include dealers in the relevant markets, end-users of the relevant product, information vendors and other sources of market information. The Settlement Amount shall not include consequential, incidental, punitive, exemplary, indirect or business interruption damages.

Without prejudice to the Non-Defaulting Party’s duty to mitigate, the Non-Defaulting Party shall not have to enter into replacement transactions to establish a Settlement Amount. Each Party agrees and acknowledges that (i) the actual damages that the Non-Defaulting Party would incur in connection with a termination of this Agreement under Section 11.2 would be difficult or impossible to predict with certainty, (ii) the Termination Payment described in this Section 11.3(b) is a reasonable and appropriate approximation of such damages, and (iii) the Termination Payment described in this Section 11.3(b) is the exclusive remedy of the Non-Defaulting Party in connection with a termination of this Agreement after the Commercial Operation Date under Section 11.2 and the associated Event of Default.

11.4 Notice of Payment of Termination Payment or Damage Payment. As soon as practicable after a Terminated Transaction, but in no event later than sixty (60) days after the Early Termination Date (or such longer additional period, not to exceed an additional sixty (60) days, if the Non-Defaulting Party is unable, despite using commercially reasonable efforts, to calculate the Termination Payment or Damage Payment, as applicable, within such initial sixty (60)-day period despite exercising commercially reasonable efforts), Notice shall be given by the Non-Defaulting Party to the Defaulting Party of the amount of the Damage Payment or Termination Payment, as applicable, and whether the Termination Payment or Damage Payment, as applicable, is due to or from the Non-Defaulting Party. The Notice shall include a written statement explaining in reasonable detail the calculation of such amount and the sources for such calculation. The Termination Payment or Damage Payment, as applicable, shall be made to or from the Non-Defaulting Party, as applicable, within ten (10) Business Days after such Notice is effective.

11.5 Disputes With Respect to Termination Payment or Damage Payment. If the Defaulting Party disputes the Non-Defaulting Party’s calculation of the Termination Payment or Damage Payment, as applicable, in whole or in part, the Defaulting Party shall, within five (5) Business Days of receipt of the Non-Defaulting Party’s calculation of the Termination Payment or Damage Payment, as applicable, provide to the Non-Defaulting Party a detailed written explanation of the basis for such dispute. Disputes regarding the Termination Payment or Damage Payment, as applicable, shall be determined in accordance with Article 15.

11.6 Seller Pre-COD Liability Limitations. Notwithstanding anything to the contrary in this Agreement, Seller’s total liability prior to the Commercial Operation Date (excluding any Commercial Operation Delay Damages) shall not exceed
720
52 11.7 Limitation on Seller’s Ability to Make or Agree to Third-Party Sales from the Facility after Early Termination Date. If this Agreement is terminated by either Party prior to the Commercial Operation Date due to Seller’s Event of Default, neither Seller nor Seller’s Affiliates may sell, market or deliver any Product associated with or attributable to the Facility to a party other than Buyer for a period of following the Early Termination Date due to Seller’s Event of Default, unless prior to selling, marketing or delivering such Product, or entering into the agreement to sell, market or deliver such Product to a party other than Buyer, Seller or Seller’s Affiliates provide Buyer with a written offer to sell the Product on terms and conditions materially similar to the terms and conditions contained in this Agreement but with an adjusted schedule, and Buyer fails to accept such offer within forty-five (45) days of Buyer’s receipt thereof. Neither Seller nor Seller’s Affiliates may sell or transfer the Facility, or any part thereof, or the Facility’s interest in the land rights or interests in the Site (including the interconnection queue position of the Facility) each for the avoidance of doubt as and to the extent applicable to the Facility, so long as the limitations contained in this Section 11.7 apply, unless the transferee agrees to be bound by the terms set forth in this Section 11.7 pursuant to a written agreement approved by Buyer, which approval shall not be unreasonably withheld, conditioned, or delayed. Seller shall indemnify and hold Buyer harmless from all benefits lost and other damages sustained by Buyer as a result of any breach by Seller of its covenants contained within this Section 11.7.

11.8 Rights And Remedies Are Cumulative. Except where liquidated damages or other remedy are explicitly provided as the exclusive remedy herein, the rights and remedies of a Party pursuant to this Article 11 shall be cumulative and in addition to the rights of the Parties otherwise provided in this Agreement.

11.9 Mitigation. Any Non-Defaulting Party shall be obligated to use commercially reasonable efforts to mitigate its Costs, Losses and damages resulting from any Event of Default of the other Party under this Agreement.

ARTICLE 12
LIMITATION OF LIABILITY AND EXCLUSION OF WARRANTIES.

12.1 No Consequential Damages. EXCEPT TO THE EXTENT (A) PART OF AN

EXPRESS REMEDY OR MEASURE OF DAMAGES HEREIN, (B) PART OF A THIRD PARTY INDEMNITY CLAIM UNDER ARTICLE 16, (C) INCLUDED IN A LIQUIDATED DAMAGES CALCULATION, OR (D) RESULTING FROM A PARTY’S WILLFUL

MISCONDUCT, NEITHER PARTY SHALL BE LIABLE TO THE OTHER OR ITS

INDEMNIFIED PERSONS FOR ANY SPECIAL, PUNITIVE, EXEMPLARY, INDIRECT, OR

CONSEQUENTIAL DAMAGES, OR LOSSES OR DAMAGES FOR LOST REVENUE OR

LOST PROFITS, WHETHER FORESEEABLE OR NOT, ARISING OUT OF, OR IN CONNECTION WITH THIS AGREEMENT, BY STATUTE, IN TORT OR CONTRACT.

12.2 Waiver and Exclusion of Other Damages. EXCEPT AS EXPRESSLY SET

FORTH HEREIN, THERE IS NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR

A PARTICULAR PURPOSE, AND ANY AND ALL IMPLIED WARRANTIES ARE DISCLAIMED. THE PARTIES CONFIRM THAT THE EXPRESS REMEDIES AND

MEASURES OF DAMAGES PROVIDED IN THIS AGREEMENT SATISFY THE 721
53 ESSENTIAL PURPOSES HEREOF. ALL LIMITATIONS OF LIABILITY CONTAINED IN

THIS AGREEMENT, INCLUDING, WITHOUT LIMITATION, THOSE PERTAINING TO SELLER’S LIMITATION OF LIABILITY AND THE PARTIES’ WAIVER OF

CONSEQUENTIAL DAMAGES, SHALL APPLY EVEN IF THE REMEDIES FOR BREACH OF WARRANTY PROVIDED IN THIS AGREEMENT ARE DEEMED TO “FAIL OF THEIR ESSENTIAL PURPOSE” OR ARE OTHERWISE HELD TO BE INVALID OR UNENFORCEABLE.

FOR BREACH OF ANY PROVISION FOR WHICH AN EXPRESS AND EXCLUSIVE

REMEDY OR MEASURE OF DAMAGES IS PROVIDED, SUCH EXPRESS REMEDY OR

MEASURE OF DAMAGES SHALL BE THE SOLE AND EXCLUSIVE REMEDY, THE OBLIGOR’S LIABILITY SHALL BE LIMITED AS SET FORTH IN SUCH PROVISION, AND ALL OTHER REMEDIES OR DAMAGES AT LAW OR IN EQUITY ARE WAIVED.

IF NO REMEDY OR MEASURE OF DAMAGES IS EXPRESSLY PROVIDED HEREIN, THE OBLIGOR’S LIABILITY SHALL BE LIMITED TO DIRECT DAMAGES ONLY. THE

VALUE OF ANY TAX CREDITS, DETERMINED ON AN AFTER-TAX BASIS, LOST DUE TO BUYER’S DEFAULT (WHICH SELLER HAS NOT BEEN ABLE TO MITIGATE AFTER

USE OF REASONABLE EFFORTS) AND AMOUNTS DUE IN CONNECTION WITH THE

RECAPTURE OF ANY TAX CREDITS, IF ANY, SHALL BE DEEMED TO BE DIRECT DAMAGES. TO THE EXTENT ANY DAMAGES REQUIRED TO BE PAID HEREUNDER ARE LIQUIDATED, INCLUDING UNDER SECTIONS 3.5(b), 4.3, 4.9(c), 4.9(f), 11.2, 11.3 AND 11.6, AND AS PROVIDED IN EXHIBIT B, and EXHIBIT C, THE PARTIES

ACKNOWLEDGE THAT THE DAMAGES ARE DIFFICULT OR IMPOSSIBLE TO

DETERMINE, THAT OTHERWISE OBTAINING AN ADEQUATE REMEDY IS

INCONVENIENT, AND THAT THE LIQUIDATED DAMAGES CONSTITUTE A REASONABLE APPROXIMATION OF THE ANTICIPATED HARM OR LOSS. IT IS THE

INTENT OF THE PARTIES THAT THE LIMITATIONS HEREIN IMPOSED ON REMEDIES

AND THE MEASURE OF DAMAGES BE WITHOUT REGARD TO THE CAUSE OR

CAUSES RELATED THERETO, INCLUDING THE NEGLIGENCE OF ANY PARTY,

WHETHER SUCH NEGLIGENCE BE SOLE, JOINT OR CONCURRENT, OR ACTIVE OR PASSIVE. THE PARTIES HEREBY WAIVE ANY RIGHT TO CONTEST SUCH PAYMENTS AS AN UNREASONABLE PENALTY.

THE PARTIES ACKNOWLEDGE AND AGREE THAT MONEY DAMAGES AND THE

EXPRESS REMEDIES PROVIDED FOR HEREIN ARE AN ADEQUATE REMEDY FOR THE

BREACH BY THE OTHER OF THE TERMS OF THIS AGREEMENT, AND EACH PARTY

WAIVES ANY RIGHT IT MAY HAVE TO SPECIFIC PERFORMANCE WITH RESPECT TO ANY OBLIGATION OF THE OTHER PARTY UNDER THIS AGREEMENT.

ARTICLE 13
REPRESENTATIONS AND WARRANTIES; COVENANTS

13.1 Seller’s Representations and Warranties. As of the Execution Date, Seller represents and warrants as follows:
722
54 (a) Seller is a limited liability company, duly organized, validly existing and in good standing under the laws of the jurisdiction of its formation and is or will be qualified to conduct business in each jurisdiction where the failure to so qualify would have a material adverse effect on the business or financial condition of Seller. (b) Seller has the power and authority to enter into and (subject to potential management, board, or board committee approvals as and when required for the applicable performance obligations) perform this Agreement and is not prohibited from entering into this Agreement or discharging and (subject to the foregoing parenthetical) performing all covenants and obligations on its part to be performed under and pursuant to this Agreement, except where such failure does not have a material adverse effect on Seller’s performance under this Agreement.

The execution, delivery and (subject to the foregoing parenthetical) performance of this Agreement by Seller has been duly authorized by all necessary limited liability company action on the part of Seller and does not and will not require the consent of any trustee or holder of any indebtedness or other obligation of Seller or any other party to any other agreement with Seller. Notwithstanding the foregoing, Seller’s failure to obtain the approvals set forth in the parenthetical in the first two sentences above (i) shall not suspend or excuse Seller’s failure to perform its obligations under this Agreement, including the obligation of Seller to achieve the Guaranteed Construction Start Date or Guaranteed Commercial Operation Date beyond the extensions provided in Exhibit B, and (ii) shall not limit Buyer’s right to declare an Event of Default pursuant to Section 11.1(a) or Section 11.1(b) and receive a Damage Payment upon exercise of Buyer’s default rights pursuant to Section 11.2.
(c) The execution and delivery of this Agreement, consummation of the transactions contemplated herein, and fulfillment of and compliance by Seller with the provisions of this Agreement will not conflict with or constitute a breach of or a default under any Law presently in effect having applicability to Seller, subject to any permits that have not yet been obtained by Seller, the documents of formation of Seller or any outstanding trust indenture, deed of trust, mortgage, loan agreement or other evidence of indebtedness or any other agreement or instrument to which Seller is a party or by which any of its property is bound. (d) This Agreement has been duly executed and delivered by Seller. This Agreement is a legal, valid and binding obligation of Seller enforceable in accordance with its terms, except as limited by laws of general applicability limiting the enforcement of creditors’ rights or by the exercise of judicial discretion in accordance with general principles of equity. (e) Neither Seller nor its Affiliates have received notice from or been advised by any existing or potential supplier or service provider that the disease designated COVID-19 or the related virus designated SARS-CoV-2 have caused, or are reasonably likely to cause, a delay in the construction of the Facility or the delivery of materials necessary to complete the Facility, in each case that would cause the Commercial Operation Date to be later than the Guaranteed Commercial Operation Date. Notwithstanding anything to the contrary in this Agreement, Buyer’s only remedy for any breach of this representation by Seller shall be that Seller may not claim relief under Article 10 for a Force Majeure Event or Section 4 of Exhibit B for a Development Cure Period on the basis of such delays.

13.2 Buyer’s Representations and Warranties. As of the Execution Date, Buyer 723
55 represents and warrants as follows:
(a) Buyer is a joint powers authority and a validly existing community choice aggregator, duly organized, validly existing and in good standing under the laws of the State of California and the rules, regulations and orders of the CPUC, and is qualified to conduct business in its jurisdiction. All Persons making up the governing body of Buyer are the elected or appointed incumbents in their positions and hold their positions in good standing in accordance with the Joint Powers Agreement and other Law.
(b) Buyer has the power and authority to enter into and perform this Agreement and is not prohibited from entering into this Agreement or discharging and performing all covenants and obligations on its part to be performed under and pursuant to this Agreement, except where such failure does not have a material adverse effect on Buyer’s performance under this Agreement. The execution, delivery and performance of this Agreement by Buyer has been duly authorized by all necessary action on the part of Buyer and does not and will not require the consent of any trustee or holder of any indebtedness or other obligation of Buyer or any other party to any other agreement with Buyer.
(c) The execution and delivery of this Agreement, consummation of the transactions contemplated herein, and fulfillment of and compliance by Buyer with the provisions of this Agreement will not conflict with or constitute a breach of or a default under any Law presently in effect having applicability to Buyer, including but not limited to community choice aggregation, the Joint Powers Act, competitive bidding, public notice, open meetings, election, referendum, or prior appropriation requirements, the documents of formation of Buyer or any outstanding trust indenture, deed of trust, mortgage, loan agreement or other evidence of indebtedness or any other agreement or instrument to which Buyer is a party or by which any of its property is bound.
(d) This Agreement has been duly executed and delivered by Buyer. This Agreement is a legal, valid and binding obligation of Buyer enforceable in accordance with its terms, except as limited by laws of general applicability limiting the enforcement of creditors’ rights or by the exercise of judicial discretion in accordance with general principles of equity. (e) Buyer warrants and covenants that with respect to its contractual obligations under this Agreement, it will not claim immunity on the grounds of sovereignty or similar grounds with respect to itself or its revenues or assets from (1) suit, (2) jurisdiction of court, (3) relief by way of injunction, order for specific performance or recovery of property, (4) attachment of assets, or (5) execution or enforcement of any judgment.
(f) Buyer cannot assert sovereign immunity as a defense to the enforcement of its obligations under this Agreement.
(g) Buyer is a “local public entity” as defined in Section 900.4 of the Government Code of the State of California.

13.3 General Covenants. Each Party covenants that commencing on the Effective Date and continuing throughout the Contract Term:
724
56 (a) It shall continue to be duly organized, validly existing and in good standing under the laws of the jurisdiction of its formation and to be qualified to conduct business in each jurisdiction where the failure to so qualify would have a material adverse effect on its business or financial condition;
(b) It shall maintain (or obtain from time to time as required) all regulatory authorizations necessary for it to legally perform its obligations under this Agreement; and (c) It shall perform its obligations under this Agreement in compliance with all terms and conditions in its governing documents and in material compliance with any Law.

13.4 Seller’s Covenants. Seller covenants that commencing on the Effective Date and continuing throughout the Contract Term:
(a) Compliance with Laws. Seller shall comply with all applicable federal, state and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any courts or administrative bodies or tribunals, including, without limitation employment discrimination laws and prevailing wage laws.
(b) Seller shall obtain and maintain any and all permits and approvals necessary for the construction and operation of the Facility, including without limitation, environmental clearance under CEQA or other environmental law, as applicable, from the local jurisdiction where the Facility is or will be constructed.
(c) Seller or its Affiliate shall maintain Site Control throughout the Delivery Term.

13.5 Project Labor. Seller shall ensure that work performed in connection with construction of the Facility is conducted using one hundred percent (100%) union labor or a community workforce agreement, work site agreement, project labor agreement, collective bargaining agreement, or other similar agreement providing for terms and conditions of employment with applicable labor organization.

13.6 Supplier Diversity. Seller acknowledges that Buyer will request voluntary disclosure of Seller’s certification status with the CPUC Clearinghouse, and voluntary disclosure regarding Seller’s efforts to work with diverse business enterprises, including women, minority, disabled veteran, and lesbian, gay, bisexual, transgender and/or persons with disabilities business enterprises.

13.7 Community Benefits. Seller pledges to contribute two hundred fifty thousand dollars ($250,000) for community benefits initiatives that directly benefit stakeholders in Buyer’s service area and/or communities adjacent to the Site. Buyer and Seller shall identify initiatives that are of mutual interest such as housing, education, workforce training, environmental stewardship, and habitat improvement. Seller shall make this payment within sixty (60) days after the Commercial Operation Date.

ARTICLE 14
725
57 ASSIGNMENT

14.1 General Prohibition on Assignments. Except as provided below in this Article 14, neither Party may assign this Agreement or its rights or obligations under this Agreement, without the prior written consent of the other Party, which consent shall not be unreasonably withheld, conditioned or delayed. Any Change of Control of Seller (whether voluntary or by operation of law) will be deemed an assignment and will require the prior written consent of Buyer, which consent shall not be unreasonably withheld, conditioned or delayed, except as specified in Section 14.3. Any assignment made without the required written consent, or in violation of the conditions to assignment set out below, shall be null and void. The assigning Party shall pay the other Party’s reasonable expenses associated with the preparation, review, execution and delivery of documents in connection with any assignment of this Agreement by the assigning Party, including reasonable attorneys’ fees. Buyer shall cooperate with Seller or any Lender or other financing party to execute or arrange for the delivery of any consents, estoppels, and other documents reasonably requested by Seller, Lender, or such other financing party, including the Collateral Assignment Agreement provided in Section 14.2, to consummate any financing or refinancing, including in connection with a financing in which the membership interests of Seller or its direct or indirect parent are collaterally assigned in lieu of an assignment of this Agreement; provided, however, Buyer will have no obligation to provide any consent, or enter into any agreement, that materially and adversely affects any of Buyer’s rights, benefits, risks or obligations under this Agreement, or to modify the Agreement, except as provided in this Article 14.

14.2 Collateral Assignment; Financing Cooperation. Subject to the provisions of this Section 14.2, Seller has the right to assign this Agreement as collateral for any financing or refinancing of the Facility without the consent of Buyer. In connection with any financing or refinancing of the Facility, Buyer shall in good faith work with Seller and Lender to agree upon a consent to collateral assignment of this Agreement (“Collateral Assignment Agreement”), which shall be substantially in the form of Exhibit T and (ii) an estoppel certificate in a form substantially similar to the estoppel certificate set forth in Exhibit U (“Estoppel Certificate”). Seller shall pay Buyer’s reasonable expenses, including attorneys’ fees, incurred to provide consents, estoppels, or other required documentation in connection with Seller’s financing of the Facility. Buyer shall have no obligation to provide any consent, or enter into any agreement, that materially and adversely affects any of Buyer’s rights, benefits, risks or obligations under this Agreement, or to modify this Agreement.

14.3 Permitted Assignments. Seller may without the prior written consent of Buyer:
(a) assign this Agreement to an Affiliate of Seller, including to NEOP, NEP and NEECH; (b) assign, collaterally assign, or pledge its interest hereunder and/or in the Facility to a Lender or any other financing party in accordance with Section 14.2; or (c) make any Permitted Transfer or otherwise assign this Agreement pursuant to or in connection with any Permitted Transfer. Any Change of Control of Seller (whether voluntary or by operation of law) will be deemed an assignment and will require the prior written consent of Buyer, which consent shall not be unreasonably withheld, conditioned, or delayed; provided that, Buyer’s consent shall not be required if (i) such Change of Control is, or is a result of, a direct or indirect Change of Control of NEOP or NEP, or (ii) the entity that is the Seller at the conclusion of the Change of Control is a Permitted Transferee. For avoidance of doubt, (i) a Change of Control shall not be deemed to have occurred as a result of a Permitted Transfer, and no consent is required under this Agreement with 726
58 respect to a Permitted Transfer, and (ii) Seller may, without the prior written consent of Buyer, finance all or any portion of the Facility or the Interconnection Facilities or the Shared Facilities utilizing debt financing, equity financing (including tax equity), lease financing, or any other form of financing or any combination thereof, including pursuant to a portfolio financing of multiple energy generation, storage, and transmission facilities and other assets of Seller or Seller’s Affiliates (which may include cross-collateralization or similar arrangements).

14.4 Portfolio Financing. Buyer agrees and acknowledges that Seller may elect to finance all or any portion of the Facility or the Interconnection Facilities or the Shared Facilities (1) utilizing tax equity investment, and/or (2) through a Portfolio Financing, which may include cross-collateralization or similar arrangements. In connection with any financing or refinancing of the Facility, the Interconnection Facilities or the Shared Facilities by Seller or any Portfolio Financing, Buyer, Seller, Portfolio Financing Entity (if any), and Lender shall execute and deliver such further consents, approvals and acknowledgments as may be reasonable and necessary to facilitate such transactions; provided, Buyer shall not be required to agree to any terms or conditions which are reasonably expected to have a material adverse effect on Buyer and all reasonable attorney’s fees incurred by Buyer in connection therewith shall be borne by Seller.

14.5 Permitted Assignment by Buyer. If a change in Law occurs after the Effective Date that allows a tax-exempt load serving entity, including Buyer, to include product purchased under an energy storage agreement with a standalone storage facility, including Product purchased under this Agreement, in a municipal prepayment transaction, then subject to the terms and conditions of this Agreement, Buyer may make a limited assignment in connection with a municipal prepayment transaction to an entity (“Limited Assignee”) that has an Investment Grade Credit Rating of Buyer’s right to receive certain Product (which shall not be for retail sale, and which shall not include any right to issue Charging Notices or Dispatch Notices or to dispatch the Facility or any portion of the Product, or any right or obligation to act as the Scheduling Coordinator for the Facility or to offer any portion of the Product into the CAISO markets) and Buyer’s obligation to make payments for such Product to the Seller (subject to the foregoing exclusions, “Assigned Product”). The limited assignment shall not introduce, or purport to convey or otherwise allege, any right of Buyer or Limited Assignee to make any prepayment to Seller under the Agreement or to file or impose any lien on the Facility, or otherwise modify any provision of this Agreement, and shall be expressly subject to the Limited Assignee’s timely payment of amounts due under this Agreement with respect to the Assigned Product. Buyer shall pay Seller for any payments not timely made by Limited Assignee, and Buyer shall remain obligated to perform all of its obligations under this Agreement notwithstanding the limited assignment, including without limitation any credit-related requirements, and payment for all amounts due and owing under this Agreement, including the total gross amount due to Seller under each invoice. Any failure by the Limited Assignee to make payments to Seller when due hereunder shall be a Buyer Event of Default if not cured within the applicable cure period specified in this Agreement. Subject to the foregoing, Buyer may make such an assignment upon not less than thirty (30) days’ advance written notice by delivering to Seller a written request for Seller’s consent to such assignment and the proposed form of limited assignment agreement in form and substance acceptable to Seller and its Lenders (if any), including that Seller shall not be required to agree to any terms or conditions which are reasonably expected to have an adverse effect on Seller or its Lenders. Notwithstanding anything to the contrary in connection with such limited assignment, if (1) the assignment, transfer or conveyance of the Assigned Product pursuant to such limited 727
59 assignment, or (2) Seller’s performance of any obligation under the assignment agreement, fails to meet any requirements of this Agreement, then Seller shall not be deemed to be in breach of any obligation in this Agreement, including without limitation any representation or warranty herein.

Buyer shall reimburse Seller for its out-of-pocket costs and expenses, including reasonable attorneys’ fees in excess of $5,000, incurred in connection with any such assignment, or requested assignment, including in connection with obtaining required consents from its Lenders. Limited Assignee and Buyer shall comply with all reasonable requests received by Seller or any Lender in connection with such limited assignment, including providing any requested acknowledgments with respect to any Collateral Assignment Agreement.

ARTICLE 15

DISPUTE RESOLUTION

15.1 Governing Law. This Agreement and the rights and duties of the Parties hereunder shall be governed by and construed, enforced and performed in accordance with the laws of the state of California, without regard to principles of conflicts of Law. TO THE EXTENT

ENFORCEABLE AT SUCH TIME, EACH PARTY WAIVES ITS RESPECTIVE RIGHT

TO ANY JURY TRIAL WITH RESPECT TO ANY LITIGATION ARISING UNDER OR IN CONNECTION WITH THIS AGREEMENT. The Parties agree that any suit, action or other legal proceeding by or against any party (or its affiliates or designees) with respect to or arising out of this Agreement shall be brought in the federal courts of the United States or the courts of the State of California sitting in the County of San Diego, California.

15.2 Judicial Reference. Each of the Parties hereto hereby consents to the adjudication of all claims pursuant to judicial reference as provided in California Code of Civil Procedure Section 638, and the judicial referee shall be a retired judge and shall be empowered to hear and determine all issues in such reference, whether fact or law. Each of the Parties hereto represents that each has reviewed this waiver and consent and each knowingly and voluntarily waives its jury trial rights and consents to judicial reference following consultation with legal counsel on such matters. In the event of litigation, a copy of this Agreement may be filed as a written consent to a trial by the court or to judicial reference under California Code of Civil Procedure Section 638 as provided herein.

15.3 Dispute Resolution. In the event of any dispute arising under this Agreement, within ten (10) days following the receipt of a Notice from either Party identifying such dispute, the Parties shall meet, negotiate and attempt, in good faith, to resolve the dispute quickly and informally without significant legal costs. If the Parties are unable to resolve a dispute arising hereunder within thirty (30) days after Notice of the dispute, the Parties may pursue all remedies available to them at Law in or equity in accordance with this Agreement.

15.4 Attorneys’ Fees. In any proceeding brought to enforce this Agreement or because of the breach by any Party of any covenant or condition herein contained, the prevailing Party shall be entitled to reasonable attorneys’ fees (including reasonably allocated fees of in-house counsel) in addition to court costs and any and all other costs recoverable in said action. 728
60 ARTICLE 16

INDEMNIFICATION

16.1 Indemnity.
(a) Each Party (the “Indemnifying Party”) agrees to indemnify, defend and hold harmless the other Party and its Affiliates, directors, officers, employees and agents (collectively, the “Indemnified Party”) from and against all third party claims, demands, losses, liabilities, penalties, and expenses (including reasonable attorneys’ fees) (i) for personal injury or death to Persons and damage to the property of any third party to the extent arising out of, resulting from, or caused by the negligent or willful misconduct of the Indemnifying Party, its Affiliates, its directors, officers, employees, or agents, or (ii) for third-party claims resulting from the Indemnifying Party’s breach (including inaccuracy of any representation of warranty made hereunder), performance or non-performance of its obligations under this Agreement (“Indemnifiable Losses”).
(b) Nothing in this Section shall enlarge or relieve Seller or Buyer of any liability to the other for any breach of this Agreement. Neither Party shall be indemnified for its damages resulting from its sole negligence, intentional acts, or willful misconduct. These indemnity provisions shall not be construed to relieve any insurer of its obligations to pay claims consistent with the provisions of a valid insurance policy.

16.2 Claims. Promptly after receipt by a Party of any claim or Notice of the commencement of any action, administrative, or legal proceeding, or investigation as to which an indemnity provided for in this Article 16 may apply, the Indemnified Party shall notify the Indemnifying Party in writing of such fact. The Indemnifying Party shall assume the defense thereof with counsel designated by the Indemnifying Party and satisfactory to the Indemnified Party, provided, if the defendants in any such action include both the Indemnified Party and the Indemnifying Party and the Indemnified Party shall have reasonably concluded that there may be legal defenses available to it which are different from or additional to, or inconsistent with, those available to the Indemnifying Party, the Indemnified Party shall have the right to select and be represented by separate counsel, at the Indemnifying Party’s expense, unless a liability insurer is willing to pay such costs.

16.3 Defense and Settlement. If the Indemnifying Party fails to assume the defense of a claim meriting indemnification, the Indemnified Party may at the expense of the Indemnifying Party contest, settle, or pay such claim; provided, settlement or full payment of any such claim may be made only following consent of the Indemnifying Party or, absent such consent, written opinion of the Indemnified Party’s counsel that such claim is meritorious or warrants settlement.

Except as otherwise provided in this Article 16, in the event that a Party is obligated to indemnify and hold the other Party and its successors and assigns harmless under this Article 16, the amount owing to the Indemnified Party will be the amount of the Indemnified Party’s damages net of any insurance proceeds received by the Indemnified Party following a reasonable effort by the Indemnified Party to obtain such insurance proceeds.
729
730
62 standard “all risk” property insurance coverage in amounts that are not less than the actual replacement value of the Facility; provided, however, with respect to property insurance for natural catastrophes, Seller shall maintain limits equivalent to a probable maximum loss amount determined by a firm with experience providing such determinations. (i) Evidence of Insurance. Within thirty (30) days after execution of the Agreement and upon annual renewal thereafter, Seller shall deliver to Buyer certificates of insurance evidencing such coverage as is required to be in effect at the times specified above. Such certificates shall specify that Buyer shall be given at least thirty (30) days prior Notice by Seller in the event of any material modification, cancellation or termination of coverage. Such insurance shall be primary coverage without right of contribution from any insurance of Buyer. Any other insurance maintained by Seller is for the exclusive benefit of Seller and shall not in any manner inure to the benefit of Buyer. The general liability, auto liability and worker’s compensation policies shall be endorsed with a waiver of subrogation in favor of Buyer for all work performed by Seller, its employees, agents and sub-contractors.

ARTICLE 18

CONFIDENTIAL INFORMATION

18.1 Definition of Confidential Information. The following constitutes “Confidential Information,” whether oral or written which is delivered by Seller to Buyer or by Buyer to Seller including: (a) the terms and conditions of, and proposals and negotiations related to, this Agreement, and (b) information that either Seller or Buyer stamps or otherwise identifies as “confidential” or “proprietary” before disclosing it to the other. Confidential Information does not include (i) information that was publicly available at the time of the disclosure, other than as a result of a disclosure in breach of this Agreement; (ii) information that becomes publicly available through no fault of the recipient after the time of the delivery; (iii) information that was rightfully in the possession of the recipient (without confidential or proprietary restriction) at the time of delivery or that becomes available to the recipient from a source not subject to any restriction against disclosing such information to the recipient; and (iv) information that the recipient independently developed without a violation of this Agreement.

18.2 Duty to Maintain Confidentiality. The Party receiving Confidential Information (the “Receiving Party”) from the other Party (the “Disclosing Party”) shall not disclose Confidential Information to a third party (other than the Party’s members, employees, lenders or investors, counsel, accountants, directors or advisors, or any such representatives of a Party’s Affiliates, who have a need to know such information and have agreed to keep such terms confidential) except in order to comply with any applicable Law, regulation, or any exchange, control area or independent system operator rule or in connection with any court or regulatory proceeding applicable to such Party or any of its Affiliates; provided, each Party shall, to the extent practicable, use reasonable efforts to prevent or limit the disclosure. For the avoidance of doubt, the Parties acknowledge and agree that the information contained in Exhibit A is not Confidential Information. The Parties shall be entitled to all remedies available at law or in equity to enforce, or seek relief in connection with, this confidentiality obligation. The Parties agree and acknowledge that nothing in this Section 18.2 prohibits a Party from disclosing any one or more of the commercial terms of a transaction (other than the name of the other Party unless otherwise agreed to in writing by the Parties) to any industry price source for the purpose of aggregating and 731
63 reporting such information in the form of a published energy price index.

The Parties acknowledge and agree that the Agreement and any transactions entered into in connection herewith are subject to the requirements of the California Public Records Act (Government Code Section 7920 et seq.). In order to designate information as confidential, the Disclosing Party must clearly stamp and identify the specific portion of the material designated with the word “Confidential.” The Parties agree not to over-designate material as Confidential Information. Over-designation includes stamping whole agreements, entire pages or series of pages as “Confidential” that clearly contain information that is not Confidential Information.

Upon request or demand of any third person or entity not a Party hereto to Buyer pursuant to the California Public Records Act for production, inspection and/or copying of Confidential Information (“Requested Confidential Information”), Buyer shall as soon as practical notify Seller in writing via email that such request has been made. Seller shall be solely responsible for taking at its sole expense whatever legal steps are necessary to prevent release of the Requested Confidential Information to the third party by Buyer. If Seller takes no such action after receiving the foregoing notice from Buyer, Buyer shall, at its discretion, be permitted to comply with the third party’s request or demand and is not required to defend against it. If Seller does take or attempt to take such action, Buyer shall provide timely and reasonable cooperation to Seller, if requested by Seller, and Seller agrees to indemnify and hold harmless Buyer and Buyer’s Indemnified Parties from any claims, liability, award of attorneys’ fees, or damages, and to defend any action, claim or lawsuit brought against any of Buyer or Buyer’s Indemnified Parties for Buyer’s refusal to disclose any Requested Confidential Information.

18.3 Irreparable Injury; Remedies. Receiving Party acknowledges that its obligations hereunder are necessary and reasonable in order to protect Disclosing Party and the business of Disclosing Party, and expressly acknowledges that monetary damages would be inadequate to compensate Disclosing Party for any breach or threatened breach by Receiving Party of any covenants and agreements set forth herein. Accordingly, Receiving Party acknowledges that any such breach or threatened breach will cause irreparable injury to Disclosing Party and that, in addition to any other remedies that may be available, in law, in equity or otherwise, Disclosing Party will be entitled to obtain injunctive relief against the threatened breach of this Agreement or the continuation of any such breach, without the necessity of proving actual damages.

18.4 Further Permitted Disclosure. Notwithstanding anything to the contrary in this Article 18, Confidential Information may be disclosed by the Receiving Party to any of its agents, consultants, contractors, trustees, or actual or potential financing parties (including, in the case of Seller, its Lender(s)), so long as such Person to whom Confidential Information is disclosed agrees in writing to be bound by confidentiality provisions that are at least as restrictive as this Article 18 to the same extent as if it were a Party.

18.5 Press Releases. Neither Party shall issue (or cause its Affiliates to issue) a press release regarding the transactions contemplated by this Agreement unless both Parties have agreed upon the contents of any such press release.
732
64 ARTICLE 19

MISCELLANEOUS

19.1 Entire Agreement; Integration; Exhibits. This Agreement, together with the Cover Sheet and Exhibits attached hereto, constitutes the entire agreement and understanding between Seller and Buyer with respect to the subject matter hereof and supersedes all prior agreements relating to the subject matter hereof (including the Prior ESA), which are of no further force or effect. The Exhibits attached hereto are integral parts hereof and are made a part of this Agreement by reference. The headings used herein are for convenience and reference purposes only. In the event of a conflict between the provisions of this Agreement and those of the Cover Sheet or any Exhibit, the provisions of first the Cover Sheet, and then this Agreement shall prevail, and such Exhibit shall be corrected accordingly. This Agreement shall be considered for all purposes as prepared through the joint efforts of the Parties and shall not be construed against one Party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution hereof.

19.2 Amendments. Except as otherwise explicitly permitted herein, this Agreement may only be amended, modified or supplemented by an instrument in writing executed by duly authorized representatives of Seller and Buyer; provided, this Agreement may not be amended by electronic mail communications.

19.3 No Waiver. Waiver by a Party of any default by the other Party shall not be construed as a waiver of any other default.

19.4 No Agency, Partnership, Joint Venture or Lease. Seller and the agents and employees of Seller shall, in the performance of this Agreement, act in an independent capacity and not as officers or employees or agents of Buyer. Under this Agreement, Seller and Buyer intend to act as energy seller and energy purchaser, respectively, and do not intend to be treated as, and shall not act as, partners in, co-venturers in or lessor/lessee with respect to the Facility or any business related to the Facility. This Agreement shall not impart any rights enforceable by any third party (other than a permitted successor or assignee bound to this Agreement) and/or, to the extent set forth herein, any Lender and/or Indemnified Party.

19.5 Severability. In the event that any provision of this Agreement is unenforceable or held to be unenforceable, the Parties agree that all other provisions of this Agreement have force and effect and shall not be affected thereby. The Parties shall, however, use their best endeavors to agree on the replacement of the void, illegal or unenforceable provision(s) with legally acceptable clauses which correspond as closely as possible to the sense and purpose of the affected provision and this Agreement as a whole.

19.6 Mobile-Sierra. Notwithstanding any other provision of this Agreement, neither Party shall seek, nor shall they support any third party seeking, to prospectively or retroactively revise the rates, terms or conditions of service of this Agreement through application or complaint to FERC pursuant to the provisions of Section 205, 206 or 306 of the Federal Power Act, or any other provisions of the Federal Power Act, absent prior written agreement of the Parties. Further, absent the prior written agreement in writing by both Parties, the standard of review for changes to the rates, terms or conditions of service of this Agreement proposed by a Party shall be the 733
65 “public interest” standard of review set forth in United Gas Pipe Line Co. v. Mobile Gas Service Corp., 350 U.S. 332 (1956) and Federal Power Commission v. Sierra Pacific Power Co., 350 U.S. 348 (1956). Changes proposed by a non-Party or FERC acting sua sponte shall be subject to the most stringent standard permissible under applicable Law.

19.7 Counterparts. This Agreement may be executed in one or more counterparts, all of which taken together shall constitute one and the same instrument and each of which shall be deemed an original.

19.8 Electronic Delivery. This Agreement may be duly executed and delivered by a Party by electronic format (including portable document format (.pdf)). Delivery of an executed counterpart in .pdf electronic version shall be binding as if delivered in the original. The words “execution,” “signed,” “signature,” and words of like import in this Agreement shall be deemed to include electronic signatures or electronic records, each of which shall be of the same legal effect, validity, or enforceability as a manually executed signature or the use of a paper-based record keeping system, as the case may be, to the extent and as provided for in any applicable law.

19.9 Binding Effect. This Agreement shall inure to the benefit of and be binding upon the Parties and their respective successors and permitted assigns.

19.10 No Recourse to Members of Buyer. Buyer is organized as a Joint Powers Authority in accordance with the Joint Exercise of Powers Act of the State of California (Government Code Section 6500, et seq.) pursuant to its Joint Powers Agreement and is a public entity separate from its constituent members. As set forth in this Agreement, Buyer shall solely be responsible for all debts, obligations and liabilities accruing and arising out of this Agreement, and Seller shall have no rights and shall not make any claims, take any actions or assert any remedies against any of Buyer’s constituent members, or the officers, directors, advisors, contractors, consultants or employees of Buyer or its constituent members, in connection with this Agreement.

19.11 Forward Contract; Inapplicability/Waiver of Bankruptcy Code Section 366. (a) Each Party acknowledges, intends, and to the extent applicable agrees that (i) this Agreement and the transactions contemplated by this Agreement constitute a “forward contract” and at least one of the Parties is a “forward contract merchant” within the meaning of the United States Bankruptcy Code; (ii) all payments made or to be made by a Party pursuant to this Agreement, including the application by a Party of any security posted by the other Party to any amounts due and owing to such Party, constitute “settlement payments” within the meaning of the United States Bankruptcy Code; and (iii) its rights under Section 11.2 of this Agreement constitute a “contractual right to liquidate, terminate or accelerate” or offset under a forward contract within the meaning of ⸹⸹556, 561 of the Bankruptcy Code. (b) Each Party acknowledges and agrees that, upon a Party becoming Bankrupt, the other Party shall be entitled to exercise its rights and remedies under this Agreement in accordance with the safe harbor provisions of the Bankruptcy Code set forth in, inter alia, Sections 362(b)(6), 362(b)(17), 362(b)(27), 546(e), 548(d)(2), 556, and 561 thereof. (c) Each Party acknowledge and agrees that, for all purposes of this 734
66 Agreement, that the provisions of 11 U.S.C. § 366 in any bankruptcy case or proceeding wherein such Party is a debtor are inapplicable, or if found to be applicable each Party waives and agrees not to assert the applicability of the provisions of 11 U.S.C. § 366 in any bankruptcy case or proceeding wherein such Party is a debtor. In any such bankruptcy case or proceeding, each Party further waives the right to assert that the other Party is a provider of last resort to the extent such term relates to 11 U.S.C. §366 or any other provision of 11 U.S.C. § 101-1532.

19.12 Change in Electric Market Design. If a change in the CAISO Tariff renders this Agreement or any provisions hereof incapable of being performed or administered, then any Party may request that Buyer and Seller enter into negotiations to make the minimum changes to this Agreement necessary to make this Agreement capable of being performed and administered, while attempting to preserve to the maximum extent possible the benefits, burdens, and obligations set forth in this Agreement as of the Execution Date. Upon delivery of such a request, Buyer and Seller shall engage in such negotiations in good faith. If Buyer and Seller are unable, within sixty (60) days after delivery of such request, to agree upon changes to this Agreement or to resolve issues relating to changes to this Agreement, then any Party may submit issues pertaining to changes to this Agreement to the dispute resolution process set forth in Article 15. Notwithstanding the foregoing, (i) a change in cost shall not in and of itself be deemed to render this Agreement or any of the provisions hereof incapable of being performed or administered, and (ii) all of the unaffected provisions of this Agreement shall remain in full force and effect during any period of such negotiation or dispute resolution.

19.13 Further Assurances. Each of the Parties hereto agrees to provide such information, execute and deliver any instruments and documents and to take such other actions as may be necessary or reasonably requested by the other Party which are not inconsistent with the provisions of this Agreement and which do not involve the assumption of obligations other than those provided for in this Agreement, to give full effect to this Agreement and to carry out the intent of this Agreement.[Signatures on following page]
735
Signature Page
IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed as of the Effective Date.

YELLOW PINE SOLAR III, LLC
By:

Name:

Title:

SAN DIEGO COMMUNITY POWER
By:

Name:

Title:

Approved as to form:

By:

Name:

Title:
736

Exhibit A - 1

EXHIBIT A

FACILITY DESCRIPTION
Site Name: Yellow Pine Solar III (for clarification, the Facility will comprise only a portion of the entire Yellow Pine Solar III Complex)
Site includes all or some of the following APNs: 17100001004, 17100001010, 17100001011, 17100001012, 17100001009, 16800002025, 16800002024, 17100001007, 17100001008, 17100001005, 17100001006, 17100001004, 17100001005 *
County: Clark County, Nevada
Zip Code: 89061
Latitude and Longitude: 36.067942°, -115.780358°
Facility Description: A standalone battery energy storage facility located in Clark County, in the State of Nevada. The Facility is a portion of a larger complex. Seller may install additional inverter capacity to account for production and delivery losses.

Interconnection Point: The Facility shall interconnect at the PNode.

Delivery Point: The Delivery Point for the Facility shall be the PNode for the Facility.

Facility Meter: See Exhibit R.

PNode: If not available at the Execution Date, the PNode shall be established prior to the Commercial Operation Date. Seller shall promptly notify Buyer following establishment of the PNode.

Participating Transmission Owner: GridLiance
Additional Information: None
* The APNs identified above are sufficient for Seller to build the Facility. Seller may add additional APNs without the consent of Buyer.
737

Exhibit B - 1

EXHIBIT B

FACILITY CONSTRUCTION AND COMMERCIAL OPERATION

1. Construction of the Facility.
(a) “Construction Start” will occur upon Seller’s execution of an engineering, procurement and construction (EPC) contract related to the Facility and issuance of a full notice to proceed with the construction of the Facility under the EPC contract, mobilization to the Site by Seller and/or its designees that includes the physical movement of soil at the Site. The date of Construction Start will be evidenced by and subject to Seller’s delivery to Buyer of a certificate substantially in the form attached as Exhibit J hereto, and the date certified therein shall be the “Construction Start Date.” Seller shall cause Construction Start to occur no later than the Guaranteed Construction Start Date, as may be extended by Seller’s payment of Daily Delay Damages pursuant to Section 1(b) of this Exhibit B and/or a Development Cure Period pursuant to Section 4 of this Exhibit B.
(b) In addition to extensions pursuant to a Development Cure Period, Seller may extend the Guaranteed Construction Start Date by electing to pay Daily Delay Damages in advance to Buyer for each day Seller desires to extend the Guaranteed Construction Start Date, not to exceed a total of of extensions by such payment of Daily Delay Damages.

If Seller elects to extend the Guaranteed Construction Start Date, on or before the date that is ten (10) days prior to the then-current (including any previous extensions) Guaranteed Construction Start Date, Seller shall provide notice and payment to Buyer of the Daily Delay Damages for the number of days of extension to the Guaranteed Construction Start Date. For the avoidance of doubt, Seller has no obligation to pay any Daily Delay Damages in connection with any failure or delay in achieving the Guaranteed Construction Start Date. If Seller achieves Construction Start prior to the Guaranteed Construction Start Date, as extended by the payment of Daily Delay Damages, Buyer shall refund to Seller the Daily Delay Damages for each day Seller achieves Construction Start prior to the Guaranteed Construction Start Date times the Daily Delay Damages, not to exceed the total amount of Daily Delay Damages paid by Seller pursuant to this Section 1(b) of Exhibit B. If Seller achieves Commercial Operation on or before the Guaranteed Commercial Operation Date (not including any extensions to such date resulting from Seller’s payment of Commercial Operation Delay Damages, but as may be extended pursuant to a Development Cure Period), then Buyer shall refund to Seller all Daily Delay Damages paid by Seller and not previously refunded by Buyer.

2. Commercial Operation of the Facility. “Commercial Operation” means the condition existing when Seller has fulfilled all of the conditions precedent in Section 2.2 of the Agreement and provided Notice to Buyer substantially in the form of Exhibit H (the “COD Certificate”). The “Commercial Operation Date” shall be the date on which Commercial Operation is achieved. (a) Seller shall cause Commercial Operation to occur no later than the Guaranteed Commercial Operation Date, as such date may be extended by Seller’s election to pay Commercial Operation Delay Damages pursuant to Section 2(b) of this Exhibit B and/or a Development Cure Period pursuant to Section 4 of this Exhibit B. Seller shall notify Buyer at least sixty (60) days before the anticipated Commercial Operation Date. For the avoidance of doubt, Seller has no 738

Exhibit B - 2
obligation to pay any Commercial Operation Delay Damages in connection with any failure or delay in achieving the Guaranteed Commercial Operation Date. (b) In addition to extensions pursuant to a Development Cure Period, Seller may extend the Guaranteed Commercial Operation Date by paying Commercial Operation Delay Damages in advance to Buyer for each day Seller desires to extend the Guaranteed Commercial Operation Date, not to exceed a total of of extensions by such payment of Commercial Operation Delay Damages; provided, however, that Seller may apply any unrefunded Daily Delay Damages paid by Seller toward the payment of any Commercial Operation Delay Damages, and shall pay the remainder owed after such credit is applied. If Seller elects to extend the Guaranteed Commercial Operation Date, on or before the date that is ten (10) days prior to the then-current Guaranteed Commercial Operation Date, Seller may provide Notice and payment to Buyer of the Commercial Operation Delay Damages (less any amounts credited for payment of unrefunded Daily Delay Damages) for the number of days of extension to the Guaranteed Commercial Operation Date. If Seller achieves Commercial Operation prior to the Guaranteed Commercial Operation Date, as extended by the payment of Commercial Operation Delay Damages (including through crediting of unrefunded Daily Delay Damages), Buyer shall refund to Seller the Commercial Operation Delay Damages for each day Seller achieves Commercial Operation prior to the Guaranteed Commercial Operation Date times the Commercial Operation Delay Damages, not to exceed the total amount of Commercial Operation Delay Damages paid by Seller pursuant to this Section 2(b) of Exhibit B.

3. Termination for Failure to Timely Achieve Construction Start and/or Commercial Operation. If the Facility has not achieved Construction Start on or before the Guaranteed Construction Start Date (as may be extended hereunder), Buyer may elect to terminate this Agreement in accordance with Sections 11.1(b)(ii) and 11.2. If the Facility has not achieved Commercial Operation on or before the Guaranteed Commercial Operation Date (as may be extended hereunder), Buyer may elect to terminate this Agreement in accordance with Sections 11.1(b)(ii) and 11.2.

4. Extension of the Guaranteed Dates.
(a) The Guaranteed Construction Start Date and the Guaranteed Commercial Operation Date shall, subject to notice and documentation requirements set forth below, both be extended on a day-for-day basis (the “Development Cure Period”) for the duration of any and all delays (including for events that may have commenced or result from events prior to the Execution Date) arising out of the following circumstances to the extent the following circumstances are not the result of Seller’s failure to take all commercially reasonable actions to meet its requirements and deadlines:
(i) a delay caused by one or more Force Majeure Events, ;
(ii) the Interconnection Facilities or Network Upgrades are not complete and ready at least four (4) months prior to the Guaranteed Commercial Operation Date (as in effect before an extension under this Section 4(b)) to enable the Facility to sell Product at the Delivery Point by such Guaranteed 739

Exhibit B - 3
Commercial Operation Date, despite the exercise of diligent and commercially reasonable efforts by Seller,
(iii) Buyer has not made all necessary arrangements to receive the Facility Energy at the Delivery Point by the Guaranteed Commercial Operation Date; or
(b) Notwithstanding anything in this Agreement to the contrary, the cumulative extensions granted under the Development Cure Period (other than the extensions granted pursuant to clause 4(c) above, which shall not have a limit as applied to Seller) shall not exceed for any reason. Notwithstanding anything to the
contrary herein, no extension shall be given under a Development Cure Period if, and to the extent that (A) the delay was the result of Seller’s failure to take commercially reasonable actions to meet its requirements and deadlines, (B) Seller failed to provide requested documentation as provided below, or (C) Seller failed to provide written notice to Buyer as required for a Force Majeure Event (provided for clarification purposes, if the Force Majeure Event written notice is provided but not timely under Section 10.3, Seller shall be entitled to a Development Cure Period extension but reduced by the number of days that such notice is late), if applicable, or as required in the next sentence. Seller shall provide prompt written notice to Buyer of a delay, but in no case more than thirty (30) days after Seller became aware of such delay, except that in the case of a delay occurring within sixty (60) days of the Guaranteed Commercial Operation Date, or after such date, Seller must provide written notice within five (5) Business Days of Seller becoming aware of such delay.

Upon request from Buyer, Seller shall provide documentation demonstrating to Buyer’s reasonable satisfaction that the delays described above did not result from Seller’s actions or failure to take commercially reasonable actions.

5. Failure to Reach Guaranteed Capacity. If, at Commercial Operation, the Installed Capacity is less than one hundred percent (100%) of the Guaranteed Capacity, Seller shall have after the Commercial Operation Date to install additional capacity such that the Installed Capacity is up to (but not greater than) the Guaranteed Capacity, and Seller shall provide 740

Exhibit B - 4
to Buyer a new certificate substantially in the form attached as Exhibit I hereto specifying the new Installed Capacity. If Seller fails to achieve an Installed Capacity that is 100% of the Guaranteed Capacity by such date, Seller shall pay “Capacity Damages” to Buyer, in an amount equal to that the Guaranteed Capacity exceeds
the Installed Capacity, and the Guaranteed Capacity, Performance Security, and other applicable portions of the Agreement, including Exhibit Q, shall be adjusted accordingly. Capacity Damages shall not be offset or reduced by the payment of Daily Delay Damages, Commercial Operation Delay Damages, or any other form of liquidated damages under this Agreement. 741
Exhibit C - 1

EXHIBIT C

COMPENSATION
Buyer shall compensate Seller for the Product in accordance with this Exhibit C. 742
Exhibit C - 2
743
Exhibit D - 1

EXHIBIT D

SCHEDULING COORDINATOR RESPONSIBILITIES
(a) Buyer as Scheduling Coordinator for the Facility. Buyer shall be the Scheduling Coordinator or designate a qualified third party to provide Scheduling Coordinator services with the CAISO for the Facility for both the delivery and the receipt (as applicable) of Charging Energy, Discharging Energy and the Product at the Delivery Point. At least thirty (30) days prior to the Initial Synchronization, (i) Seller shall take all actions and execute and deliver to Buyer and the CAISO all documents necessary to authorize or designate Buyer (or Buyer’s designee) as the Scheduling Coordinator for the Facility, and (ii) Buyer shall, and shall cause its designee to, take all actions and execute and deliver to Seller and the CAISO all documents necessary to authorize or designate Buyer or its designee as the Scheduling Coordinator for the Facility. Seller shall not authorize or designate any other party to act as the Facility’s Scheduling Coordinator, nor shall Seller perform for its own benefit the duties of Scheduling Coordinator, and Seller shall not revoke Buyer’s authorization to act as the Facility’s Scheduling Coordinator unless agreed to by Buyer.

Buyer (as the Facility’s SC) shall submit Schedules to the CAISO in accordance with this Agreement and the applicable CAISO Tariff, protocols and Scheduling practices for Product on a day-ahead, hour-ahead, fifteen-minute market, real time or other CAISO market basis that may develop after the Effective Date, as determined by Buyer. (b) Notices. Buyer (as the Facility’s SC) shall provide Seller with access to a web-based system through which Seller shall submit to Buyer and the CAISO all notices and updates required under the CAISO Tariff regarding the Facility’s status, including, but not limited to, all outage requests, forced outages, forced outage reports, clearance requests, or must offer waiver forms. Seller shall cooperate with Buyer to provide such notices and updates. If the web-based system is not available, Seller shall promptly submit such information to Buyer and the CAISO (in order of preference) telephonically, by electronic mail, or transmission to the personnel designated to receive such information.
(c) CAISO Costs and Revenues. Buyer (as Scheduling Coordinator for the Facility) shall be responsible for CAISO costs (including Charging Energy, penalties, Imbalance Energy costs or revenues, and other charges) and shall be entitled to all CAISO revenues (including Discharging Energy, credits, Imbalance Energy revenues or costs, and other payments), including revenues associated with CAISO dispatches, bid cost recovery, Inter-SC Trade credits, or other credits in respect of the Product Scheduled or delivered from the Delivery Point and Charging Energy delivered to the Delivery Point; provided, however, Seller shall assume all liability and reimburse Buyer for any and all CAISO penalties (i) incurred by Buyer resulting from any failure by Seller to abide by the CAISO Tariff requirements imposed on it as Facility owner (but not in connection with obligations of Buyer hereunder) or the outage notification requirements set forth in this Agreement (except to the extent such non-compliance is caused by Buyer’s failure to perform its duties as Scheduling Coordinator for the Facility), or (ii) to the extent arising as a result of Seller’s failure to comply with a timely Curtailment Order if such failure results in incremental costs to Buyer. The Parties agree that any Availability Incentive Payments (as defined in the CAISO Tariff) are for the benefit of Seller and for Seller’s account and that any Non-Availability Charges (as defined in the CAISO Tariff) are the responsibility of Seller and for Seller’s account (if such penalties are related to Seller’s failure to adhere to its obligations under this Agreement). 744
Exhibit D - 2
In addition, if during the Delivery Term, the CAISO implements or has implemented any sanction or penalty related to scheduling, outage reporting, or generator operation, and any such sanctions or penalties are imposed upon the Facility or to Buyer as Scheduling Coordinator due to failure by Seller to abide by the CAISO Tariff or the outage notification requirements set forth in this Agreement, the cost of the sanctions or penalties shall be Seller’s responsibility. (d) CAISO Settlements. Buyer (as the Facility’s SC) shall be responsible for all settlement functions with the CAISO related to the Facility. Buyer shall render a separate invoice to Seller for any CAISO payments, charges or penalties (“CAISO Charges Invoice”) for which Seller is responsible under this Agreement. CAISO Charges Invoices shall be rendered after settlement information becomes available from the CAISO that identifies any CAISO charges.

Notwithstanding the foregoing, Seller acknowledges that the CAISO will issue additional invoices reflecting CAISO adjustments to such CAISO charges. Buyer shall review, validate, and if requested by Seller under paragraph (e) below, dispute any charges that are the responsibility of Seller in a timely manner and consistent with Buyer’s existing settlement processes for charges that are Buyer’s responsibilities. Subject to Seller’s right to dispute and to have Buyer pursue the dispute of any such invoices, Seller shall pay the amount of CAISO Charges Invoices within thirty (30) days of Seller’s receipt of the CAISO Charges Invoice. If Seller fails to pay such CAISO Charges Invoice within that period, Buyer may net or offset any amounts owing to it for such CAISO Charges Invoices against any future amounts it may owe to Seller under this Agreement.

The obligations under this Section with respect to payment of CAISO Charges Invoices in respect of performance prior to the expiration or termination of this Agreement shall survive the expiration or termination of this Agreement.
(e) Dispute Costs. Buyer (as the Facility’s SC) shall if requested by Seller dispute CAISO settlements in respect of the Facility. Seller agrees to pay Buyer’s costs and expenses (including reasonable attorneys’ fees) associated with its involvement with such CAISO disputes to the extent they relate to CAISO charges payable by Seller with respect to the Facility that Seller has directed Buyer to dispute, except to the extent such dispute arises from Buyer’s failure to perform its duties as Scheduling Coordinator for the Facility. (f) Terminating Buyer’s Designation as Scheduling Coordinator. At least thirty (30) days prior to expiration of this Agreement or as soon as reasonably practicable upon an earlier termination of this Agreement, the Parties will take all actions necessary to terminate the designation of Buyer as Scheduling Coordinator for the Facility as of 11:59 p.m. on such expiration date.
(g) Master Data File and Resource Data Template. Seller shall provide the data to the CAISO (and to Buyer) that is required for the CAISO’s Master Data File and Resource Data Template (or successor data systems) for the Facility consistent with this Agreement. Neither Party shall change such data without the other Party’s prior written consent. (h) NERC Reliability Standards. Buyer (as Scheduling Coordinator) shall cooperate reasonably with Seller to the extent necessary to enable Seller to comply, and for Seller to demonstrate Seller’s compliance with, NERC reliability standards. This cooperation shall include the provision of information in Buyer’s possession that Buyer (as Scheduling Coordinator) has 745
Exhibit D - 3
provided to the CAISO related to the Facility or actions taken by Buyer (as Scheduling Coordinator) related to Seller’s compliance with NERC reliability standards. 746
Exhibit E - 1

EXHIBIT E

PROGRESS REPORTING FORM
Each Progress Report must include the following items:

1. Executive Summary.

2. Facility description.

3. Site plan of the Facility.

4. Description of any material planned changes to the Facility or the Site.

5. Gantt chart schedule showing progress on achieving each of the Milestones.

6. Summary of activities during the previous calendar quarter or month, as applicable, including any OSHA labor hour reports.

7. Forecast of activities scheduled for the current calendar quarter.

8. Written description about the progress relative to Seller’s Milestones, including whether Seller has met or is on target to meet the Milestones.

9. List of issues that are reasonably likely to affect Seller’s Milestones.

10. A status report of start-up activities including a forecast of activities ongoing and after start-up, a report on Facility performance including performance projections for the next twelve (12) months.

11. [Prevailing wage reports as required by Law.]

12. Progress and schedule of all material agreements, contracts, permits, approvals, technical studies, financing agreements and major equipment purchase orders showing the start dates, completion dates, and completion percentages.

13. Pictures, in sufficient quantity and of appropriate detail, in order to document construction and startup progress of the Facility, the interconnection into the Transmission System and all other interconnection utility services.

14. Workforce Development or Supplier Diversity Reporting (if applicable). Format to be provided by Buyer.

15. Any other documentation reasonably requested by Buyer. 747
Exhibit F - 1

EXHIBIT F

FORM OF MONTHLY EXPECTED AVAILABLE CAPACITY REPORT
[Available Capacity, MW Per Hour] – [Insert Month]
1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24:00 Day 1
Day 2
Day 3
Day 4
Day 5
[insert additional rows for each day in the month]
Day
29 Day
30 Day
31 The foregoing table is provided for informational purposes only, and it shall not constitute, or be deemed to constitute, an obligation of any of the Parties to this Agreement.
748
Exhibit G - 1

EXHIBIT G

FORM OF DAILY AVAILABILITY NOTICE
Trading Day:

Station: Issued By:

Unit: Issued At:

Unit 100% Available No Restrictions:

Hour Ending Available Capacity Comments
(MW)
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
Comments:
749
Exhibit H - 1

EXHIBIT H

FORM OF COMMERCIAL OPERATION DATE CERTIFICATE
This certification (“Certification”) of Commercial Operation is delivered by _______ [licensed professional engineer] (“Engineer”) to San Diego Community Power, a California joint powers authority (“Buyer”) in accordance with the terms of that certain Amended and Restated Energy Storage Service Agreement (60 MW-8hr. BESS) dated _______ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement.

As of _______[DATE]_____, Engineer hereby certifies and represents to Buyer the following:

1. The Facility is fully operational, interconnected, and synchronized with the Transmission System in accordance with the Interconnection Agreement.

2. The Facility has met all Interconnection Agreement requirements and is capable of receiving Charging Energy from, and delivering Discharging Energy to, the CAISO Balancing Authority.

3. The commissioning of the equipment has been completed in accordance with the applicable material requirements of the manufacturers’ specifications.

4. The Facility’s Installed Capacity is no less than ninety-five percent (95%) of the Guaranteed Capacity and the Facility is capable of charging, storing and discharging Energy, all within the operational constraints and subject to the applicable Operating Restrictions.

5. Authorization to parallel the Facility was obtained by the Participating Transmission Owner, [Name of Participating Transmission Owner as appropriate] on___[DATE]____.

6. The Participating Transmission Owner has provided documentation supporting full unrestricted release for Commercial Operation by [Name of Participating Transmission Owner as appropriate] on _______[DATE]_____.

7. The CAISO has provided notification supporting Commercial Operation (which for avoidance of doubt shall not require certification including CAISO certification of ancillary services with respect to the Facility), in accordance with the CAISO Tariff on _______[DATE]_____.

EXECUTED by [LICENSED PROFESSIONAL ENGINEER]
this ________ day of _____________, 20__.
[LICENSED PROFESSIONAL ENGINEER]
By:

Its:

Date:
750
Exhibit I - 1

EXHIBIT I

FORM OF CAPACITY AND EFFICIENCY RATE TEST CERTIFICATE
This certification (“Certification”) of Capacity and Efficiency Rate Test results is delivered by [licensed professional engineer] (“Engineer”) to San Diego Community Power, a California joint powers authority (“Buyer”) in accordance with the terms of that certain Amended and Restated Energy Storage Service Agreement (60 MW-8hr. BESS) dated __________ (“Agreement”) by and between [SELLER ENTITY] and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement.

I hereby certify that a Capacity Test conducted on [Date] demonstrated (i) an [Installed or Effective] Capacity of __ MW AC to the Delivery Point at eight (8) hours of continuous discharge, and (ii) an Efficiency Rate of __%, all in accordance with the testing procedures, requirements and protocols set forth in Section 4.4 and Exhibit O.

EXECUTED by [LICENSED PROFESSIONAL ENGINEER]
this ________ day of _____________, 20__.
[LICENSED PROFESSIONAL ENGINEER]
By:

Its:

Date:
751

Exhibit J - 1

EXHIBIT J

FORM OF CONSTRUCTION START DATE CERTIFICATE
This certification of Construction Start Date (“Certification”) is delivered by [SELLER ENTITY] (“Seller”) to San Diego Community Power, a California joint powers authority (“Buyer”) in accordance with the terms of that certain Amended and Restated Energy Storage Service Agreement (60 MW-8hr. BESS) dated __________ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement.

Seller hereby certifies and represents to Buyer the following:
(1) Construction Start (as defined in Exhibit B of the Agreement) has occurred, and a copy of the notice to proceed that Seller issued to its contractor as part of Construction Start is attached hereto.
(2) the Construction Start Date occurred on _____________ (the “Construction Start Date”); and
(3) the precise Site on which the Facility is located is, which must be within the boundaries of the previously identified Site:
_____________________________________________________________________ (such description shall amend the description of the Site in Exhibit A of the Agreement.) IN WITNESS WHEREOF, the undersigned has executed this Certification on behalf of Seller as of the ___ day of ________.
[SELLER ENTITY]
By:

Its:

Date:
752

Exhibit K - 1

EXHIBIT K

FORM OF LETTER OF CREDIT
[Issuing Bank Letterhead and Address]
IRREVOCABLE STANDBY LETTER OF CREDIT NO. [XXXXXXX]
Date:

Bank Ref.:

Amount: US$[XXXXXXXX]
Expiry Date:

Beneficiary:

San Diego Community Power Authority
PO Box 12716
San Diego, CA 92112
Ladies and Gentlemen:

By the order of __________ (“Applicant”), we, [insert bank name and address] (“Issuer”) hereby issue our Irrevocable Standby Letter of Credit No. [XXXXXXX] (the “Letter of Credit”) in favor of San Diego Community Power, a California joint powers authority (“Beneficiary”), for an amount not to exceed the aggregate sum of U.S. $[XXXXXX] (United States Dollars [XXXXX] and 00/100), pursuant to that certain Amended and Restated Energy Storage Service Agreement (60 MW-8hr. BESS) dated as of ______ and as amended (the “Agreement”) between Applicant and Beneficiary. This Letter of Credit shall become effective immediately and shall renew annually until terminated in accordance with the terms hereof (the “Expiration Date”).

Funds under this Letter of Credit are available to Beneficiary by valid presentation on or before the Expiration Date of a dated statement purportedly signed by your duly authorized representative, in the form attached hereto as Exhibit A, containing one of the two alternative paragraphs set forth in paragraph 2 therein, referencing our Letter of Credit No. [XXXXXXX] (“Drawing Certificate”).

The Drawing Certificate may be presented by (a) physical delivery, (b) as a PDF attachment to an e-mail to [bank email address] or (c) facsimile to [bank fax number [XXX-XXX-XXXX]] confirmed by [e-mail to [bank email address]]. Transmittal by facsimile or email shall be deemed delivered when received.

The original of this Letter of Credit (and all amendments, if any) is not required to be presented in connection with any presentment of a Drawing Certificate by Beneficiary hereunder in order to receive payment.

We hereby agree with Beneficiary that all documents presented under and in compliance with the terms of this Letter of Credit will be duly honored upon presentation to Issuer on or before the 753
Exhibit K - 2
Expiration Date. All payments made under this Letter of Credit shall be made with Issuer’s own immediately available funds by means of wire transfer in immediately available United States dollars to Beneficiary’s account as indicated by Beneficiary in its Drawing Certificate or in a communication accompanying its Drawing Certificate.

Partial draws are permitted under this Letter of Credit, and this Letter of Credit shall remain in full force and effect with respect to any continuing balance.

This Letter of Credit may only be terminated upon one hundred twenty (120) days’ prior written notice from Issuer to Beneficiary by registered mail or overnight courier service that Issuer elects not to extend this Letter of Credit, in which case it will expire on the date specified in such notice.

No presentation made under this Letter of Credit after such Expiration Date will be honored.

Notwithstanding any reference in this Letter of Credit to any other documents, instruments or agreements, this Letter of Credit contains the entire agreement between Beneficiary and Issuer relating to the obligations of Issuer hereunder.

This Letter of Credit is subject to the Uniform Customs and Practice for Documentary Credits (2007 Revision) International Chamber of Commerce Publication No. 600 (the “UCP”), except to the extent that the terms hereof are inconsistent with the provisions of the UCP, including but not limited to Articles 14(b) and 36 of the UCP, in which case the terms of this Letter of Credit shall govern. In the event of an act of God, riot, civil commotion, insurrection, war or any other cause beyond Issuer’s control (as defined in Article 36 of the UCP) that interrupts Issuer’s business and causes the place for presentation of the Letter of Credit to be closed for business on the last day for presentation, the Expiration Date of the Letter of Credit will be automatically extended without amendment to a date thirty (30) calendar days after the place for presentation reopens for business.

Please address all correspondence regarding this Letter of Credit to the attention of the Letter of Credit Department at [insert bank address information], referring specifically to Issuer’s Letter of Credit No. [XXXXXXX]. For telephone assistance, please contact Issuer’s Standby Letter of Credit Department at [XXX-XXX-XXXX] and have this Letter of Credit available.

All notices to Beneficiary shall be in writing and are required to be sent by certified letter, overnight courier, or delivered in person to: San Diego Community Power, Chief Financial Officer, PO Box 12716, San Diego, CA 92112. Only notices to Beneficiary meeting the requirements of this paragraph shall be considered valid. Any notice to Beneficiary which is not in accordance with this paragraph shall be void and of no force or effect. [Bank Name]
___________________________
[Insert officer name]
[Insert officer title]
754
Exhibit K - 2
(DRAW REQUEST SHOULD BE ON BENEFICIARY’S LETTERHEAD)
Drawing Certificate
[Insert Bank Name and Address]
Ladies and Gentlemen:

The undersigned, a duly authorized representative of San Diego Community Power, a California joint powers authority, PO Box 12716, San Diego, CA 92112, as beneficiary (the “Beneficiary”) of the Irrevocable Letter of Credit No. [XXXXXXX] (the “Letter of Credit”) issued by [insert bank name] (the “Bank”) by order of __________ (the “Applicant”), hereby certifies to the Bank as follows:

1. Applicant and Beneficiary are party to that certain Amended and Restated Energy Storage Service Agreement (60 MW-8hr. BESS) dated as of ___________, 20__ (the “Agreement”).

2. Beneficiary is making a drawing under this Letter of Credit in the amount of U.S. $___________ because a Seller Event of Default (as such term is defined in the Agreement) has occurred or other occasion provided for in the Agreement where Beneficiary is authorized to draw on the letter of credit has occurred.

OR
Beneficiary is making a drawing under this Letter of Credit in the amount of U.S. $___________, which equals the full available amount under the Letter of Credit, because Applicant is required to maintain the Letter of Credit in force and effect beyond the expiration date of the Letter of Credit but has failed to provide Beneficiary with a replacement Letter of Credit or other acceptable instrument within thirty (30) days prior to such expiration date.

3. The undersigned is a duly authorized representative of San Diego Community Power and is authorized to execute and deliver this Drawing Certificate on behalf of Beneficiary.

You are hereby directed to make payment of the requested amount to San Diego Community Power by wire transfer in immediately available funds to the following account:
[Specify account information]
San Diego Community Power
_______________________________
Name and Title of Authorized Representative
Date___________________________
755
Exhibit L - 1

EXHIBIT L

FORM OF GUARANTY
This Guaranty (this “Guaranty”) is entered into as of [_____] (the “Effective Date”) by and between [_____], a [______] (“Guarantor”), and San Diego Community Power, a California joint powers authority (together with its successors and permitted assigns, “Buyer”).

Recitals
A. Buyer and [SELLER ENTITY], a _____________________ (“Seller”), entered into that certain Amended and Restated Energy Storage Service Agreement (60 MW-8hr. BESS) (as amended, restated or otherwise modified from time to time, the “ESSA”) dated as of [____], 20___.

B. Guarantor is entering into this Guaranty as Performance Security to secure Seller’s obligations under the ESSA, as required by Section 8.8 of the ESSA.

C. It is in the best interest of Guarantor to execute this Guaranty inasmuch as Guarantor will derive substantial direct and indirect benefits from the execution and delivery of the ESSA.

D. Initially capitalized terms used but not defined herein have the meaning set forth in the ESSA.

Agreement

1. Guaranty. For value received, Guarantor does hereby unconditionally, absolutely and irrevocably guarantee, as primary obligor and not as a surety, to Buyer the prompt payment by Seller of any and all amounts and payment obligations now or hereafter owing from Seller to Buyer under the ESSA,(the “Obligations”), including, without limitation, compensation for penalties, the Termination Payment, indemnification payments or other damages, as and when required pursuant to the terms of the ESSA ; provided, that the Guarantor’s aggregate liability under or arising out of this Guaranty for payment of the Obligations shall not exceed _______________ Dollars ($_______________) (the “Guaranteed Amount”). The Parties understand and agree that any payment by Guarantor or Seller of any portion of the Guaranteed Amount shall thereafter reduce Guarantor’s maximum aggregate liability hereunder on a dollar-for-dollar basis. This Guaranty is an irrevocable, absolute, unconditional and continuing guarantee of the punctual payment, and not of collection, of the Guaranteed Amount and, except as otherwise expressly addressed herein, is in no way conditioned upon any requirement that Buyer first attempt to collect the payment of the Guaranteed Amount from Seller, any other guarantor of the Guaranteed Amount or any other Person or entity or resort to any other means of obtaining payment of the Guaranteed Amount. In the event Seller shall fail to duly, completely or punctually pay any Guaranteed Amount as required pursuant to the ESSA, Guarantor shall promptly pay such amount as required herein.

2. Demand Notice. For avoidance of doubt, a payment shall be due for purposes of this Guaranty only when and if a payment is due and payable by Seller to Buyer under the terms and conditions of the ESSA. If Seller fails to pay any Guaranteed Amount as required pursuant to the 756
Exhibit L - 2
ESSA for five (5) Business Days following Seller’s receipt of Buyer’s written notice of such failure (the “Demand Notice”), then Buyer may elect to exercise its rights under this Guaranty and may make a demand upon Guarantor (a “Payment Demand”) for such unpaid Guaranteed Amount. A Payment Demand shall be in writing and shall reasonably specify in what manner and what amount Seller has failed to pay and an explanation of why such payment is due and owing, with a specific statement that Buyer is requesting that Guarantor pay under this Guaranty. Guarantor shall, within five (5) Business Days following its receipt of the Payment Demand, pay the Guaranteed Amount to Buyer.

3. Scope and Duration of Guaranty. This Guaranty applies only to the Guaranteed Amount.

This Guaranty shall continue in full force and effect from the Effective Date until the earlier of the following: (x) all Guaranteed Amounts have been paid in full (whether directly or indirectly through set-off or netting of amounts owed by Buyer to Seller), (y) replacement Performance Security is provided in an amount and form required by the terms of the ESSA, or (z) the [_________] anniversary of the Effective Date. Further, this Guaranty (a) shall remain in full force and effect without regard to, and shall not be affected or impaired by any invalidity, irregularity or unenforceability in whole or in part of this Guaranty, and (b) subject to the preceding sentence, shall be discharged only by complete performance of the undertakings herein. Without limiting the generality of the foregoing, the obligations of the Guarantor hereunder shall not be released, discharged, or otherwise affected and this Guaranty shall not be invalidated or impaired or otherwise affected for the following reasons:
(i) the extension of time for the payment of any Guaranteed Amount, or (ii) any amendment, modification or other alteration of the ESSA, or (iii) any indemnity agreement Seller may have from any party, or (iv) any insurance that may be available to cover any loss, except to the extent insurance proceeds are used to satisfy the Guaranteed Amount, or
(v) any voluntary or involuntary liquidation, dissolution, receivership, insolvency, bankruptcy, assignment for the benefit of creditors, reorganization, arrangement, composition or readjustment of, or other similar proceeding affecting, Seller or any of its assets, including but not limited to any rejection or other discharge of Seller’s obligations under the ESSA imposed by any court, trustee or custodian or any similar official or imposed by any law, statue or regulation, in each such event in any such proceeding, or
(vi) the release, modification, waiver or failure to pursue or seek relief with respect to any other guaranty, pledge or security device whatsoever, or (vii) any payment to Buyer by Seller that Buyer subsequently returns to Seller pursuant to court order in any bankruptcy or other debtor-relief proceeding, or (viii) those defenses based upon (A) the legal incapacity or lack of power or authority of any Person, including Seller and any representative of Seller to enter into the ESSA or perform its obligations thereunder, (B) lack of due execution, delivery, validity or enforceability, including of 757
Exhibit L - 3
the ESSA, or (C) Seller’s inability to pay any Guaranteed Amount or perform its obligations under the ESSA, or
(ix) any other event or circumstance that may now or hereafter constitute a defense to payment of the Guaranteed Amount, including, without limitation, statute of frauds and accord and satisfaction;
provided that Guarantor reserves the right to assert for itself any defenses, setoffs or counterclaims that Seller is or may be entitled to assert against Buyer (except for such defenses, setoffs or counterclaims that may be asserted by Seller with respect to the ESSA, but that are expressly waived under any provision of this Guaranty).

4. Waivers by Guarantor. Guarantor hereby unconditionally waives as a condition precedent to the performance of its obligations hereunder, with the exception of the requirements in Paragraph 2, (a) notice of acceptance, presentment or protest with respect to the Guaranteed Amounts and this Guaranty, (b) notice of any action taken or omitted to be taken by Buyer in reliance hereon, (c) any requirement that Buyer exhaust any right, power or remedy or proceed against Seller under the ESSA, and (d) any event, occurrence or other circumstance which might otherwise constitute a legal or equitable discharge of a surety. Without limiting the generality of the foregoing waiver of surety defenses, it is agreed that the occurrence of any one or more of the following shall not affect the liability of Guarantor hereunder:
(i) at any time or from time to time, without notice to Guarantor, the time for payment of any Guaranteed Amount shall be extended, or such performance or compliance shall be waived; (ii) the obligation to pay any Guaranteed Amount shall be modified, supplemented or amended in any respect in accordance with the terms of the ESSA; (iii) subject to Section 10, any (a) sale, transfer or consolidation of Seller into or with any other entity, (b) sale of substantial assets by, or restructuring of the corporate existence of, Seller or (c) change in ownership of any membership interests of, or other ownership interests in, Seller; or
(iv) the failure by Buyer or any other Person to create, preserve, validate, perfect or protect any security interest granted to, or in favor of, Buyer or any Person.

5. Subrogation. Notwithstanding any payments that may be made hereunder by the Guarantor, Guarantor hereby agrees that until the earlier of payment in full of all Guaranteed Amounts or expiration of the Guaranty in accordance with Section 3, it shall not be entitled to, nor shall it seek to, exercise any right or remedy arising by reason of its payment of any Guaranteed Amount under this Guaranty, whether by subrogation or otherwise, against Seller or seek contribution or reimbursement of such payments from Seller.

6. Representations and Warranties. Guarantor hereby represents and warrants that (a) it has all necessary and appropriate [limited liability company][corporate] powers and authority and the legal right to execute and deliver, and perform its obligations under, this Guaranty, (b) this Guaranty constitutes its legal, valid and binding obligations enforceable against it in accordance with its terms, except as enforceability may be limited by bankruptcy, insolvency, moratorium and 758
Exhibit L - 4
other similar laws affecting enforcement of creditors’ rights or general principles of equity, (c) the execution, delivery and performance of this Guaranty does not and will not contravene Guarantor’s organizational documents, any applicable Law or any contractual provisions binding on or affecting Guarantor which would invalidate or materially impair Guarantor’s ability to perform its obligations under this Guaranty, (d) there are no actions, suits or proceedings pending before any court, governmental agency or arbitrator, or, to the knowledge of the Guarantor, threatened, against or affecting Guarantor or any of its properties or revenues which may, in any one case or in the aggregate, adversely affect the ability of Guarantor to enter into or perform its obligations under this Guaranty, and (e) no consent or authorization of, filing with, or other act by or in respect of, any arbitrator or Governmental Authority, and no consent of any other Person (including, any stockholder or creditor of the Guarantor), that has not heretofore been obtained is required in connection with the execution, delivery, performance, validity or enforceability of this Guaranty by Guarantor.

7. Notices. Notices under this Guaranty shall be deemed received if sent to the address specified below: (i) on the day received if served by overnight express delivery, and (ii) four (4) Business Days after mailing if sent by certified, first class mail, return receipt requested. If transmitted by facsimile, such notice shall be deemed received when the confirmation of transmission thereof is received by the party giving the notice. Any party may change its address or facsimile to which notice is given hereunder by providing notice of the same in accordance with this Paragraph 7.

If delivered to Buyer, to it at [____]
Attn: [____]
Fax: [____]
If delivered to Guarantor, to it at [____]
Attn: [____]
Fax: [____]

8. Governing Law and Forum Selection. This Guaranty shall be governed by, and interpreted and construed in accordance with, the laws of the United States and the State of California, excluding choice of law rules. The Parties agree that any suit, action or other legal proceeding by or against any party (or its affiliates or designees) with respect to or arising out of this Guaranty shall be brought in the federal courts of the United States or the courts of the State of California sitting in the City and County of San Diego, California.

9. Miscellaneous. This Guaranty shall be binding upon Guarantor and its successors and assigns and shall inure to the benefit of Buyer and its successors and permitted assigns pursuant to the ESSA. No provision of this Guaranty may be amended or waived except by a written instrument executed by Guarantor and Buyer. This Guaranty is not assignable by Guarantor without the prior written consent of Buyer. No provision of this Guaranty confers, nor is any provision intended to confer, upon any third party (other than Buyer’s successors and permitted assigns) any benefit or right enforceable at the option of that third party. This Guaranty embodies the entire agreement and 759
Exhibit L - 5
understanding of the parties hereto with respect to the subject matter hereof and supersedes all prior or contemporaneous agreements and understandings of the parties hereto, verbal or written, relating to the subject matter hereof. If any provision of this Guaranty is determined to be illegal or unenforceable (i) such provision shall be deemed restated in accordance with applicable Laws to reflect, as nearly as possible, the original intention of the parties hereto and (ii) such determination shall not affect any other provision of this Guaranty and all other provisions shall remain in full force and effect. This Guaranty may be executed in any number of separate counterparts, each of which when so executed shall be deemed an original, and all of said counterparts taken together shall be deemed to constitute one and the same instrument. This Guaranty may be executed and delivered by electronic means with the same force and effect as if the same was a fully executed and delivered original manual counterpart.
[Signature on next page]
760
Exhibit L -1
IN WITNESS WHEREOF, the undersigned has caused this Guaranty to be duly executed and delivered by its duly authorized representative on the date first above written.

GUARANTOR:
[_______]
By:______________________________
Printed Name:__________________
Title:____________________________
BUYER:
[_______]
By:______________________________
Printed Name:__________________
Title:____________________________
By:______________________________
Printed Name:__________________
Title:____________________________
761
762
Exhibit M - 2
[SELLER ENTITY]
By:

Its:

Date:
763
Exhibit N - 1

EXHIBIT N

NOTICES

YELLOW PINE SOLAR III, LLC
(“Seller”)

SAN DIEGO COMMUNITY POWER
(“Buyer”)
All Notices:

Street: 700 Universe Blvd.

City: Juno Beach, FL 33408
Attn: Business Management
Phone: 561-691-2866 (Office)
561-371-0992 (Mobile)
Email: [email protected] and [email protected]
All Notices:

Street: PO Box 12716
City: San Diego, CA 92112
Attn: Chief Commercial Officer
Phone: (619) 657-0422
Email:
[email protected]

Reference Numbers:

Duns: [To be provided by Seller prior to the
Delivery Term]
Federal Tax ID Number: [To be provided by
Seller prior to the Delivery Term]
Reference Numbers:

Duns:

Federal Tax ID Number:

Invoices:

Attn: Business Management
Phone:

E-mail: [email protected] and [email protected]
Invoices:

Attn: SDCP Settlements
Phone: (619) 880-6545
Email: [email protected]
Scheduling:

Attn: DA – Christin Neff RT – PMI RT
desk
Phone: DA - 561-304-6053 RT – 561-625-
7100
Facsimile:

Email: [email protected], nepm.realtimede [email protected]
Scheduling:

Tenaska Power Services Co.

Attn: Kara Whillock
Phone: (972) 333-6122
Email: [email protected]
Day Ahead: (817) 303-1115
Real Time: (817) 303-1852
Facsimile: (817) 303-1104
764
765
Exhibit N - 3

YELLOW PINE SOLAR III, LLC
(“Seller”)

SAN DIEGO COMMUNITY POWER
(“Buyer”)
Emergency Contact:

Street: 700 Universe Blvd.

City: Juno Beach, FL 33408
Attn: Business Management
Phone: 561-694-3636 (Office)
Email: [email protected] and [email protected]
Emergency Contact:

Attn: Chief Commercial Officer
Phone: (619) 657-0422
Email:
[email protected]
766
Exhibit O - 1

EXHIBIT O

CAPACITY AND EFFICIENCY RATE TESTS
Capacity Test Notice and Frequency
A. Commercial Operation Capacity Test(s). Upon no less than ten (10) Business Days prior Notice to Buyer, Seller shall schedule and complete a Commercial Operation Capacity Test prior to the Commercial Operation Date. Such initial Commercial Operation Capacity Test (and any subsequent Commercial Operation Capacity Test permitted in accordance with Section 5 of Exhibit B) shall be performed in accordance with this Exhibit O and shall establish the Installed Capacity and initial Efficiency Rate hereunder based on the actual capacity and capabilities of the Facility determined by such Commercial Operation Capacity Test(s).

B. Subsequent Capacity Tests. Following the Commercial Operation Date, at least fifteen (15) days in advance of the start of each Contract Year, upon no less than ten (10) Business Days prior Notice to Buyer, Seller shall schedule and complete a Capacity Test. In addition to the annual capacity test, if Buyer has reason to believe that the Effective Capacity or the Efficiency Rate is materially less than shown by the most recent test results, Buyer shall have the right to require a Capacity Test at any time upon no less than five (5) Business Days prior Notice to Seller.

Seller shall have the right to run a retest of any Capacity Test at any time upon five (5) Business Days’ prior Notice to Buyer (or any shorter period reasonably acceptable to Buyer consistent with Prudent Operating Practice).

C. Test Results and Re-Setting of Effective Capacity and Efficiency Rate. No later than five (5) days following any Capacity Test, Seller shall submit a testing report detailing results and findings of the test. The report shall include Facility Meter readings and plant log sheets verifying the operating conditions and output of the Facility. In accordance with Section 4.4(a)(ii) of the Agreement and Part II(I) below, after the Commercial Operation Capacity Test(s), the Effective Capacity (up to, but not in excess of, the Installed Capacity) and Efficiency Rate determined pursuant to such Capacity Test shall become the new Effective Capacity and Efficiency Rate at the beginning of the day following the completion of the test for calculating the Monthly Capacity Payment and all other purposes under this Agreement.

Capacity Test Procedures
PART I. GENERAL.

A. Each Capacity Test shall be conducted in accordance with Prudent Operating Practices, the Operating Restrictions, and the provisions of this Exhibit O. For ease of reference, a Capacity Test is sometimes referred to in this Exhibit O as a “CT”.

Buyer or its representative may be present for the CT and may, for informational purposes only, use its own metering equipment (at Buyer’s sole cost).

B. Conditions Prior to Testing.
(1) EMS Functionality. The EMS shall be successfully configured to receive data from the Battery Management System (BMS), exchange DNP3 data 767
Exhibit O - 2
with the Buyer SCADA device, and transfer data to the database server for the calculation, recording and archiving of data points. (2) Communications. The Remote Terminal Unit (RTU) testing should be successfully completed prior to any testing. The interface between Buyer’s RTU and the Facility SCADA System should be fully tested and functional prior to starting any testing, including verification of the data transmission pathway between Buyer’s RTU and Seller’s EMS interface and the ability to record SCADA System data.
(3) Commissioning Checklist. Commissioning shall be successfully completed per manufacturer guidance on all applicable installed Facility equipment, including verification that all controls, set points, and instruments of the EMS are configured.

PART II. REQUIREMENTS APPLICABLE TO ALL CAPACITY TESTS.

Note: Seller shall have the right and option in its sole discretion to install storage capacity in excess of the Guaranteed Capacity; provided, for all purposes of this Agreement, the amount of Installed Capacity shall never be deemed to exceed the Guaranteed Capacity, and all SOC measurements associated with a Capacity Test shall be based on the Installed Capacity without taking into account any capacity that exceeds the Guaranteed Capacity.

A. Test Elements. Each CT shall include at least the following individual test elements, which must be conducted in the order prescribed in Part III of this Exhibit O, unless the Parties mutually agree to deviations therefrom. The Parties acknowledge and agree that should Seller fall short of demonstrating one or more of the Test Elements as specified below, the Test will still be deemed “complete,” and any adjustments necessary to the Effective Capacity or to the Efficiency Rate resulting from such Test, if applicable, will be made in accordance with this Exhibit O. (1) Electrical output at maximum discharging level (MW) for eight (8) continuous hours; and
(2) Electrical input at maximum charging level at the Facility Meter (MW), as sustained until the SOC reaches at least 90%, continued by the electrical input at a rate up to the maximum charging level at the Facility Meter (MW), as sustained until the SOC reaches 100%, not to exceed eleven (11) hours of total charging time.

B. Parameters. During each CT, the following parameters shall be measured and recorded simultaneously for the Facility, at two (2) second intervals:
(1) Time;
(2) The amount of Discharging Energy to the Facility Meters (kWh) (i.e., to each measurement device making up the Facility Meter);
768
Exhibit O - 3
(3) Net electrical energy input from the Facility Meters (kWh) (i.e., from each measurement device making up the Facility Meter); and
(4) Stored Energy Level (MWh).

C. Intentionally Omitted.

D. Test Showing. Each CT shall record and report the following datapoints:
(1) That the CT successfully started;
(2) The maximum sustained discharging level for eight (8) consecutive hours pursuant to A(1) above;
(3) The maximum sustained charging level for eleven (11) consecutive hours (or such lesser time as is required to reach 100% SOC) pursuant to A(2) above;
(4) Amount of time between the Facility’s electrical output going from 0 to the maximum sustained discharging level registered during the CT for purposes of calculating the ramp rate (with the parties acknowledging this this value may be effeviely instantaenous and unmeasurable with precision); (5) Amount of time between the Facility’s electrical input going from 0 to the maximum sustained charging level registered during the CT(for purposes of calculating the ramp rate);
(6) Amount of Charging Energy, registered at the Facility Meter, to go from 0% SOC to 100% SOC;
(7) Amount of Discharging Energy, registered at the Facility Meter, to go from 100% SOC to 0% SOC.

E. Test Conditions.
(1) General. At all times during a CT, the Facility shall be operated in compliance with Prudent Operating Practices, the Operating Restrictions, and all operating protocols recommended, required or established by the manufacturer for the Facility.
(2) Abnormal Conditions. If abnormal operating conditions that prevent the testing or recordation of any required parameter occur during a CT, Seller may postpone or reschedule all or part of such CT in accordance with Part II.F below.
(3) Instrumentation and Metering. Seller shall provide all instrumentation, metering and data collection equipment required to perform the CT. The instrumentation, metering and data collection equipment electrical meters 769
Exhibit O - 4
shall be calibrated in accordance with Prudent Operating Practice and, as applicable, the CAISO Tariff.

F. Incomplete Test. If any CT is not completed in accordance herewith, Buyer may in its sole discretion: (i) accept the results up to the time the CT stopped without any modification to the Effective Capacity or Efficiency Rate pursuant to Section I below; (ii) require that the portion of the CT not completed, be completed within a reasonable specified time period; or (iii) require that the CT be entirely repeated within a reasonable specified time period. Notwithstanding the above, if Seller is unable to complete a CT due to a Force Majeure Event or the actions or inactions of Buyer or the CAISO or the Participating Transmission Owner, Seller shall be permitted to reconduct such CT on dates and at times reasonably acceptable to the Parties.

G. Test Report. Within five (5) Business Days after the completion of any CT, Seller shall prepare and submit to Buyer a written report of the results of the CT, which report shall include:
(1) A record of the personnel present during the CT that served in an operating, testing, monitoring or other such participatory role;
(2) The measured and calculated data for each parameter set forth in Part II.A through D, including copies of the raw data taken during the test; and (3) Seller’s statement of either Seller’s acceptance of the CT or Seller’s rejection of the CT results and reason(s) therefor.

Within ten (10) Business Days after receipt of such report, Buyer shall notify Seller in writing of either Buyer’s acceptance of the CT results or Buyer’s rejection of the CT and reason(s) therefor. If either Party rejects the results of any CT, such CT shall be repeated in accordance with Part II.F.

H. Supplementary Capacity Test Protocol. No later than sixty (60) days prior to conducting the initial Commercial Operation Capacity Test, Seller shall deliver to Buyer for its review and approval (such approval not to be unreasonably delayed or withheld) a supplement to this Exhibit O with additional and supplementary details, procedures and requirements applicable to Capacity Tests based on the then current design of the Facility (“Supplementary Capacity Test Protocol”).

Thereafter, from time to time, Seller may deliver to Buyer for its review and approval (such approval not to be unreasonably delayed or withheld) any Seller recommended updates to the then-current Supplementary Capacity Test Protocol.

The initial Supplementary Capacity Test Protocol (and each update thereto), once approved by Buyer, shall be deemed an amendment to this Exhibit O.

I. Adjustment to Effective Capacity and Efficiency Rate. The Effective Capacity and Efficiency Rate shall be updated as follows:
770
Exhibit O - 5
(1) The total amount of Discharging Energy delivered to the Delivery Point (expressed in MWh AC) during the first eight (8) hours of discharge (up to, but not in excess of, the product of (i) (a) the Guaranteed Capacity (in the case of a Commercial Operation Capacity Test, including under Section 5 of Exhibit B) or (b) the Installed Capacity (in the case of any other Capacity Test), multiplied by (ii) eight (8) hours) shall be divided by eight (8) hours to determine the Effective Capacity, which shall be expressed in MW AC, and shall be the new Effective Capacity in accordance with Section

4.4(a)(ii) of the Agreement.
(2) The total amount of Discharging Energy (as reported under Section II.D(7) above) divided by the total amount of Charging Energy (as reported under Section II.D(6) above), and expressed as a percentage, shall be recorded as the new Efficiency Rate, and shall be used for the calculation in Exhibit C until updated pursuant to a subsequent Capacity Test.

PART III. INITIAL SUPPLEMENTARY CAPACITY TEST PROTOCOL.

A. Effective Capacity and Efficiency Rate Test
• Procedure:
(1) System Starting State: The Facility will be in the on-line state at 0% SOC. (2) Record the initial value of the SOC.
(3) Command a real power charge that results in an AC power of Facility’s maximum charging level and continue charging until the earlier of (a) the Facility has reached 100% SOC or (b) eleven (11) hours have elapsed since the Facility commenced charging.
(4) Record and store the SOC after the earlier of (a) the Facility has reached 100% SOC or (b) eleven (11) hours of continuous charging. Such data point shall be used for purposes of calculation of the Battery Charging Factor. (5) Record and store the amount of Charging Energy, registered at the Facility Meter, to go from 0% SOC to 100% SOC.
(6) Following one (1) hour rest period, or other period recommended by the battery manufacturer, command a real power discharge that results in an AC power output of the Facility’s maximum discharging level and maintain the discharging state until the earlier of (a) the Facility has discharged at the maximum discharging level for eight (8) consecutive hours, or (b) the Facility has reached 0% SOC.
(7) Record and store the SOC after eight (8) hours of continuous discharging.

Such data point shall be used for purposes of calculation of the Battery Discharging Factor. If the Facility SOC remains above zero percent (0%) 771
Exhibit O - 6
after discharging at a rate at or above the Guaranteed Capacity (or at or above the Installed Capacity after a Commercial Operation Capacity Test) for eight (8) consecutive hours pursuant to Part III.A.6(a), the SOC will be deemed 0 for the purposes of calculating the Battery Discharging Factor. (8) Record and store the Discharging Energy as measured at the Facility Meter.

Such data point shall be used for purposes of calculation of the Effective Capacity.
(9) If the Facility has not reached 0% SOC pursuant to Section III.A.6, continue discharging the Facility until it reaches a 0% SOC.
(10) Record and store the Discharging Energy as measured at the Facility Meter from the commencement of discharging pursuant to Part III.A.6 until the Facility has reached a 0% SOC pursuant to either Part III.A.7 or Part III.A.9, as applicable.
• Test Results:
(1) The resulting Effective Capacity measurement is the sum of the total Discharging Energy as recorded pursuant to Section III.A(8) above at the Facility Meter divided by eight (8) hours.
(2) The total amount of Discharging Energy (as reported under Section III.A(10) above) divided by the total amount of Charging Energy (as reported under Section III.A(5) above), and expressed as a percentage, shall be recorded as the new Efficiency Rate, and shall be used for the calculation in Exhibit C until updated pursuant to a subsequent Capacity Test.

B. AGC Discharge Test
• Purpose: This test will demonstrate the AGC discharge capability to achieve the Facility’s maximum discharging level within 1 second.
• System starting state: The Facility will be in the on-line state at 50% SOC and at an initial active power level of 0 MW and reactive power level of 0 MVAR. The EMS will be configured to follow a predefined agreed-upon active power profile. • Procedure:
(1) Record the Facility active power level at the Facility Meter. (2) Command the Facility to follow a simulated CAISO RIG signal of PMAX at .95 power factor for ten (10) minutes.
(3) Record and store the Facility active power response (in seconds). 772
Exhibit O - 7
• System end state: The Facility will be in the on-line state and at a commanded active power level of 0 MW.

C. AGC Charge Test
• Purpose: This test will demonstrate the AGC charge capability to achieve the facility’s full charging level within 1 second.
• System starting state: The Facility will be in the on-line state at 50% SOC and at an initial active power level of 0 MW and reactive power level of 0 MVAR. The Facility control system will be configured to follow a predefined agreed-upon active power profile.
• Procedure:
(1) Record the Facility active power level at the Facility Meter. (2) Command the Facility to follow a simulated CAISO RIG signal of PMAX at .95 power factor for ten (10) minutes.
(3) Record and store the Facility active power response (in seconds). • System end state: The Facility will be in the on-line state and at a commanded active power level of 0 MW.

D. Reactive Power Production Test
• Purpose: This test will demonstrate the reactive power production capability of the Facility.
• System starting state: The Facility will be in the on-line state at 50% SOC and at an initial active power level of 0 MW and reactive power level of 0 MVAR. The EMS will be configured to follow an agreed-upon predefined reactive power profile. • Procedure:
(1) Record the Facility reactive power level at the Facility Meter. (2) Command the Facility to follow 19.7 MVAR for ten (10) minutes. (3) Record and store the Facility reactive power response. • System end state: The Facility will be in the on-line state and at a commanded reactive power level of 0 MVAR.

E. Reactive Power Consumption Test
773
Exhibit O - 8
• Purpose: This test will demonstrate the reactive power consumption capability of the facility.
• System starting state: The Facility will be in the on-line state at 50% SOC and at an initial active power level of 0 MW and reactive power level of 0 MVAR. The Facility control system will be configured to follow an agreed-upon predefined reactive power profile.
• Procedure:
(1) Record the Facility reactive power level at the Facility Meter. (2) Command the Facility to follow 19.7 MVAR for ten (10) minutes. (3) Record and store the Facility reactive power response. • System end state: The Facility will be in the on-line state and at a commanded reactive power level of 0 MVAR.
774
775
Exhibit P - 2
that hour or part of an hour by 5:00 a.m. of the morning Buyer schedules or bids the Facility in the Day-Ahead Market, the Facility will be deemed to be available to the extent set forth in the revised Notice.

If the Facility or any component thereof was previously deemed unavailable for an hour or part of an hour and Seller provides a revised Notice indicating the Facility is available for that hour or part of an hour at least sixty (60) minutes prior to the time the Buyer is required to schedule or bid the Facility in the Real-Time Market, and the Facility is dispatched in the Real-Time Market, the Facility will be deemed to be available to the extent set forth in the revised Notice.

Availability Adjustment
If the Seasonal Storage Availability during any Season of the Delivery Term is less than the Guaranteed Storage Availability, then Seller shall pay to Buyer liquidated damages in an amount equal to the product of (i) the aggregate monthly Storage Payments for such Season and (ii) one hundred percent (100%) minus the availability factor (“AF”) for such Season, calculated as follows (the “Availability Adjustment”):
(I) If the Seasonal Storage Availability is greater than or equal to the Guaranteed Storage Availability, then:

AF = 100%
776
777
Exhibit R - 1

EXHIBIT R

METERING DIAGRAM
To be provided to Buyer at least sixty (60) days prior to the Commercial Operation Date. 778
Exhibit S - 1

EXHIBIT S
779
Exhibit S - 2
780
Exhibit S - 3
781
Exhibit S - 4
782
Exhibit S - 5
783
Exhibit S - 6
784
Exhibit S - 7
785
Exhibit T - 1

EXHIBIT T

FORM OF COLLATERAL ASSIGNMENT AGREEMENT

FORM OF CONSENT AND AGREEMENT
([NAME OF CONTRACTING PARTY])
([NAME OF ASSIGNED AGREEMENT])
This CONSENT AND AGREEMENT (this “Consent”), dated as of ___________, 20[ ], is executed by and among [NAME OF CONTRACTING PARTY], a [legal form of Contracting Party] organized under the laws of the State of [________] (the “Contracting Party”), [__________], a [___________] (the “Project Owner”), and [_____________], as collateral agent (in such capacity, together with its successors and permitted assigns, the “Collateral Agent”) for various financial institutions named from time to time as Lenders under the Credit Agreement (as defined below) and any other parties (or any of their agents) who hold any other secured indebtedness permitted to be incurred under the Credit Agreement (the Collateral Agent and all such parties collectively, the “Secured Parties”).

A. The Project Owner owns, operates and maintains [_________________] (the “Project”).

B. The Contracting Party and the Project Owner have entered into the agreement specified in Schedule I hereto (as further amended, restated, supplemented or otherwise modified from time to time in accordance with the terms thereof and hereof, the “Assigned Agreement”).

C. The Borrower, the Project Owner, the other affiliates of the Borrower as Guarantors, various financial institutions named therein from time to time as Lenders,[_________________] , as the Administrative Agent and Collateral Agent, have entered into a Credit Agreement, dated as of [________________](as amended, modified or supplemented from time to time, the “Credit Agreement”), providing for the extension of the credit facilities described therein.

D. As security for the payment and performance by the Project Owner of its obligations under the Credit Agreement and the other Financing Documents (as defined below) and for other obligations owing to the Secured Parties, the Project Owner has assigned all of its right, title and interest in, to and under, and granted a security interest in, the Assigned Agreement to the Collateral Agent pursuant to the Assignment and Security Agreement, dated as of [_____________________]between the Project Owner and the Collateral Agent (as amended, restated, supplemented or otherwise modified from time to time in accordance with the terms thereof, the "Security Agreement", and, together with the Credit Agreement and any other financing documents relating to the issuance of the Notes, the “Financing Documents”).

E. It is a requirement under the Credit Agreement that the Project Owner cause the Contracting Party to execute and deliver this Consent. 786
Exhibit T - 2
NOW, THEREFORE as an inducement for Lenders to make the Loans, and for other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, and intending to be legally bound, the parties hereto hereby agree as follows:

1. CONSENT TO ASSIGNMENT. THE CONTRACTING PARTY

HEREBY ACKNOWLEDGES AND CONSENTS TO THE PLEDGE AND ASSIGNMENT

OF ALL RIGHT, TITLE AND INTEREST OF THE PROJECT OWNER IN, TO AND

UNDER (BUT NOT ITS OBLIGATIONS, LIABILITIES OR DUTIES WITH RESPECT

TO) THE ASSIGNED AGREEMENT BY THE PROJECT OWNER TO THE
COLLATERAL AGENT PURSUANT TO THE SECURITY AGREEMENT.

2. REPRESENTATIONS AND WARRANTIES. THE CONTRACTING
PARTY REPRESENTS AND WARRANTS AS FOLLOWS:
(a) No Amendments. [Except as described in Schedule I hereto,] there are no amendments, modifications or supplements (whether by waiver, consent or otherwise) to the Assigned Agreement, either oral or written.
(b) No Previous Assignments. The Contracting Party affirms that it has no notice of any assignment relating to the right, title and interest of the Project Owner in, to and under the Assigned Agreement other than the pledge and assignment to the Collateral Agent referred to in Section 1 above.
(c) No Termination Event: No Disputes. After giving effect to the pledge and assignment referred to in Section 1, and after giving effect to the consent to such pledge and assignment by the Contracting Party, the Contracting Party has no knowledge of any event or condition (a “Termination Event”) that would entitle either the Project Owner or the Contracting Party to terminate the Assigned Agreement or suspend the performance of its obligations under the Assigned Agreement. [Except as set forth on Schedule III hereto,] there are no unresolved disputes between the parties under the Assigned Agreement. All amounts due under the Assigned Agreement as of the date hereof have been paid in full [, except as set forth on Schedule III hereto].

3. RIGHT TO CURE.
(a) From and after the date hereof and unless and until the Contracting Party shall have received written notice from the Collateral Agent that the lien of the Security Agreement has been released in full, the Collateral Agent shall have the right, but not the obligation, following an “event of default” or “default” (or any other similar event however defined) by the Project Owner under the Assigned Agreement, to pay all sums due under the Assigned Agreement by the Project Owner and to perform any other act, duty or obligation required of the Project Owner thereunder as described in Section 3(c) below; provided, that no such payment or performance shall be construed as an assumption by the Collateral Agent or any other Secured Party of any covenants, agreements or obligations of the Project Owner under or in respect of the Assigned Agreement.
787
Exhibit T - 3
(b) The Contracting Party agrees that it will not (i) terminate the Assigned Agreement [(other than pursuant to Section __ of the Assigned Agreement)]1 or (ii) suspend the performance of any of its obligations under the Assigned Agreement without first giving the Collateral Agent notice and opportunity to cure as provided below. The Contracting Party further agrees that it will not assign any obligation under the Assigned Agreement without the prior consent of the Collateral Agent, except to the extent the Contracting Party may subcontract such obligations to other parties.
(c) If a Termination Event shall occur [(other than a termination pursuant to Section 11.1(b)(iii), (iv) (v) or (vi) of the Assigned Agreement)]2, and the Contracting Party shall then be entitled to and shall desire to terminate the Assigned Agreement or suspend the performance of any of its obligations under the Assigned Agreement, the Contracting Party shall, prior to exercising such remedies or taking any other action with respect to such Termination Event, give written notice to the Collateral Agent of such Termination Event. If the Collateral Agent elects to exercise its right to cure as herein provided, it shall have a period of fifteen (15)3 days after receipt by it of notice from the Contracting Party referred to in the preceding sentence in which to cure the Termination Event specified in such notice if such Termination Event consists of a payment default, or if such Termination Event is an event other than a failure to pay amounts due and owing by the Project Owner (a “Non-monetary Event”) the Collateral Agent shall have such longer period as is required to cure such Termination Event so long as the Collateral Agent has commenced and is diligently pursuing appropriate action to cure such Termination Event; provided, however, that (i) if possession of the Project is necessary to cure such Non-monetary Event and the Collateral Agent has commenced foreclosure proceedings, the Collateral Agent will be allowed a reasonable time to complete such proceedings, and (ii) if the Collateral Agent is prohibited from curing any such Non-monetary Event by any process, stay or injunction issued by any governmental authority or pursuant to any bankruptcy or insolvency proceeding or other similar proceeding involving the Project Owner, then the time periods specified herein for curing a Termination Event shall be extended for the period of such prohibition. (d) Any curing of or attempt to cure any Termination Event shall not be construed as an assumption by the Collateral Agent or the other Secured Parties of any covenants, agreements or obligations of the Project Owner under or in respect of the Assigned Agreement.

4. REPLACEMENT AGREEMENTS. NOTWITHSTANDING ANY

PROVISION IN THE ASSIGNED AGREEMENT TO THE CONTRARY, IN THE EVENT

THE ASSIGNED AGREEMENT IS REJECTED OR OTHERWISE TERMINATED AS A

RESULT OF ANY BANKRUPTCY, INSOLVENCY, REORGANIZATION OR SIMILAR

PROCEEDINGS AFFECTING THE PROJECT OWNER, AT THE COLLATERAL AGENT’S REQUEST, THE CONTRACTING PARTY WILL ENTER INTO A NEW AGREEMENT WITH THE COLLATERAL AGENT OR THE COLLATERAL AGENT’S 1 Insert applicable provision, if any, of the Assigned Agreement giving the Contracting Party a right to terminate the Assigned Agreement other than upon a default or other event or condition curable by the Project Owner. 2
Insert applicable provision, if any, of the Assigned Agreement giving the Contracting Party a right to terminate the Assigned Agreement other than upon a default or other event or condition curable by the Project Owner. 3
Or longer cure period specified in Assigned Agreement.
788
Exhibit T - 4

DESIGNEE FOR THE REMAINDER OF THE ORIGINALLY SCHEDULED TERM OF

THE ASSIGNED AGREEMENT, EFFECTIVE AS OF THE DATE OF SUCH

REJECTION, WITH THE SAME COVENANTS, AGREEMENTS, TERMS,

PROVISIONS AND LIMITATIONS AS ARE CONTAINED IN THE ASSIGNED AGREEMENT. NOTWITHSTANDING THE FOREGOING, THE COLLATERAL AGENT OR THE COLLATERAL AGENT’S DESIGNEE WILL EITHER BE A

QUALIFIED OPERATOR OR CONTRACT WITH A QUALIFIED OPERATOR FOR THE OPERATION OF THE FACILITY.

5. SUBSTITUTE OWNER. THE CONTRACTING PARTY

ACKNOWLEDGES THAT IN CONNECTION WITH THE EXERCISE OF REMEDIES

FOLLOWING A DEFAULT UNDER THE FINANCING DOCUMENTS, THE

COLLATERAL AGENT MAY (BUT SHALL NOT BE OBLIGATED TO) ASSUME, OR

CAUSE ANY PURCHASER AT ANY FORECLOSURE SALE OR ANY ASSIGNEE OR

TRANSFEREE UNDER ANY INSTRUMENT OF ASSIGNMENT OR TRANSFER IN

LIEU OF FORECLOSURE TO ASSUME, ALL OF THE INTERESTS, RIGHTS AND

OBLIGATIONS OF THE PROJECT OWNER THEREAFTER ARISING UNDER THE ASSIGNED AGREEMENT. IF THE INTEREST OF THE PROJECT OWNER IN THE

ASSIGNED AGREEMENT SHALL BE ASSUMED, SOLD OR TRANSFERRED AS

PROVIDED ABOVE, THE ASSUMING PARTY SHALL AGREE IN WRITING TO BE

BOUND BY AND TO ASSUME THE TERMS AND CONDITIONS OF THE ASSIGNED

AGREEMENT AND ANY AND ALL OBLIGATIONS TO THE CONTRACTING PARTY

ARISING OR ACCRUING THEREUNDER FROM AND AFTER THE DATE OF SUCH

ASSUMPTION, AND THE CONTRACTING PARTY SHALL CONTINUE TO

PERFORM ITS OBLIGATIONS UNDER THE ASSIGNED AGREEMENT IN FAVOR OF

THE ASSUMING PARTY AS IF SUCH PARTY HAD THEREAFTER BEEN NAMED AS THE “CUSTOMER” UNDER THE ASSIGNED AGREEMENT; PROVIDED THAT IF

THE COLLATERAL AGENT OR ITS DESIGNEE (OR ANY ENTITY ACTING ON BEHALF OF THE COLLATERAL AGENT, THE COLLATERAL AGENT’S DESIGNEE

OR ANY OF THE OTHER SECURED PARTIES) ASSUMES THE ASSIGNED

AGREEMENT AS PROVIDED ABOVE, IT SHALL NOT BE PERSONALLY LIABLE

FOR THE PERFORMANCE OF THE OBLIGATIONS THEREUNDER EXCEPT TO

THE EXTENT OF ALL OF ITS RIGHT, TITLE AND INTEREST IN AND TO THE PROJECT. NOTWITHSTANDING THE FOREGOING, THE COLLATERAL AGENT

OR THE DESIGNEE, PURCHASER OR ASSIGNEE OF COLLATERAL AGENT WILL

EITHER BE A QUALIFIED OPERATOR OR CONTRACT WITH A QUALIFIED OPERATOR FOR THE OPERATION OF THE FACILITY.

6. PAYMENTS. THE CONTRACTING PARTY SHALL MAKE ALL

PAYMENTS DUE TO THE PROJECT OWNER UNDER THE ASSIGNED AGREEMENT

DIRECTLY INTO THE ACCOUNT SPECIFIED ON SCHEDULE II HERETO, OR TO

SUCH OTHER PERSON OR ACCOUNT AS SHALL BE SPECIFIED FROM TIME TO

TIME BY THE COLLATERAL AGENT TO THE CONTRACTING PARTY IN WRITING. ALL PARTIES HERETO AGREE THAT EACH PAYMENT BY THE

CONTRACTING PARTY AS SPECIFIED IN THE PRECEDING SENTENCE OF

AMOUNTS DUE TO THE PROJECT OWNER FROM THE CONTRACTING PARTY

UNDER THE ASSIGNED AGREEMENT SHALL SATISFY THE CONTRACTING 789
Exhibit T - 5
PARTY’S CORRESPONDING PAYMENT OBLIGATION UNDER THE ASSIGNED AGREEMENT.

7. NO AMENDMENTS. THE CONTRACTING PARTY

ACKNOWLEDGES THAT THE FINANCING DOCUMENTS RESTRICT THE RIGHT

OF THE PROJECT OWNER TO AMEND OR MODIFY THE ASSIGNED AGREEMENT,

OR TO WAIVE OR PROVIDE CONSENTS WITH RESPECT TO CERTAIN

PROVISIONS OF THE ASSIGNED AGREEMENT, UNLESS CERTAIN CONDITIONS SPECIFIED IN THE FINANCING DOCUMENTS ARE MET. THE CONTRACTING

PARTY SHALL NOT, WITHOUT THE PRIOR WRITTEN CONSENT OF THE

COLLATERAL AGENT, AMEND OR MODIFY THE ASSIGNED AGREEMENT, OR

ACCEPT ANY WAIVER OR CONSENT WITH RESPECT TO CERTAIN PROVISIONS

OF THE ASSIGNED AGREEMENT, UNLESS THE CONTRACTING PARTY HAS

RECEIVED FROM THE PROJECT OWNER A COPY OF A CERTIFICATE

DELIVERED BY THE PROJECT OWNER TO THE COLLATERAL AGENT TO THE

EFFECT THAT SUCH AMENDMENT, MODIFICATION, WAIVER OR CONSENT HAS

BEEN MADE IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE

FINANCING DOCUMENTS, WHICH MAY IN CERTAIN CIRCUMSTANCES

REQUIRE THE PRIOR WRITTEN CONSENT OF THE COLLATERAL AGENT THERETO.

8. ADDITIONAL PROVISIONS. [TO BE SPECIFIED IF NECESSARY TO CLARIFY THE ASSIGNED AGREEMENT.]

9. NOTICES. NOTICE TO ANY PARTY HERETO SHALL BE IN
WRITING AND SHALL BE DEEMED TO BE DELIVERED ON THE EARLIER OF: (A)

THE DATE OF PERSONAL DELIVERY, OR (B) SENT BY EXPRESS COURIER, IN

EACH CASE ADDRESSED TO SUCH PARTY AT THE ADDRESS INDICATED BELOW (OR AT SUCH OTHER ADDRESS AS SUCH PARTY MAY HAVE THERETOFORE

SPECIFIED BY WRITTEN NOTICE DELIVERED IN ACCORDANCE HEREWITH), UPON DELIVERY OR REFUSAL TO ACCEPT DELIVERY:

The Collateral Agent: [________________________]
[ ]
Attn: [ ]
Telephone No.: [ ]
The Project Owner:

The Contracting Party:

790
Exhibit T - 6

10. SUCCESSORS AND ASSIGNS. THIS CONSENT SHALL BE

BINDING UPON AND SHALL INURE TO THE BENEFIT OF THE SUCCESSORS AND

ASSIGNS OF THE CONTRACTING PARTY, AND SHALL INURE TO THE BENEFIT

OF THE COLLATERAL AGENT, THE OTHER SECURED PARTIES, THE PROJECT OWNER AND THEIR RESPECTIVE SUCCESSORS, TRANSFEREES AND ASSIGNS.

11. COUNTERPARTS. THIS CONSENT MAY BE EXECUTED IN ONE

OR MORE COUNTERPARTS WITH THE SAME EFFECT AS IF THE SIGNATURES THERETO AND HERETO WERE UPON THE SAME INSTRUMENT.

12. GOVERNING LAW. THIS CONSENT SHALL BE GOVERNED BY

AND CONSTRUED IN ACCORDANCE WITH THE LAWS OF THE STATE OF NEW

YORK, WITHOUT REGARD TO PRINCIPLES OF CONFLICTS OF LAWS THEREUNDER (OTHER THAN SECTION 5-1401 OF THE NEW YORK GENERAL OBLIGATIONS LAW).
791
Exhibit T - 7
IN WITNESS WHEREOF, the parties hereto have caused their duly authorized officers to execute and deliver this Consent as of the date first written above. [NAME OF CONTRACTING PARTY]
By:

Name:

Title:
[________________________]
as Collateral Agent
By:

Name:

Title:

Acknowledged and Agreed:
[_____________________________]
By:

Name:

Title:
792
Exhibit T - 8
Schedule I
Assigned Agreement
793
Exhibit T - 9
Schedule II
Payment Instructions
(Section 6)
All payments due to the Project Owner pursuant to the Assigned Agreement shall be made to [INSERT REVENUE ACCOUNT INFORMATION].
794
Exhibit T - 1
[Schedule III]
[Amounts Due and Unpaid under the Assigned Agreement
(Section 2(c))]
795
Exhibit U - 1

EXHIBIT U

FORM OF ESTOPPEL CERTIFICATE

ESTOPPEL CERTIFICATE
(Energy Storage Service Agreement – ____________ and
This ESTOPPEL CERTIFICATE (this “Estoppel Certificate”), dated as of ________ __, 201_, is provided by ___________________, a _________________ (“Buyer”).

RECITALS
A. Buyer and ______________________, a Delaware limited liability company (the “Project Company”) are parties to that certain Amended and Restated Energy Storage Service Agreement (60 MW-8hr. BESS), dated as of ______________, 201_ (the “Energy Storage Agreement”), pursuant to which Buyer agreed to purchase from the Project Company in accordance with the terms and conditions set forth therein certain energy storage-related products from the relevant energy storage project described therein (“Storage Project”).

B. Pursuant to that certain [Lender Financing Agreement], by and between [_____] and [_____] (collectively, the “Class B Equity Investors”), the Class B Equity Investors shall acquire the “Class B” membership interests in _____________, the 100% owner of the Project Company.

C. Pursuant to Section ____ of the [Lender Financing Agreement], the Lender has required that this Estoppel Certificate be delivered as a condition precedent to the consummation of the transactions described therein.

NOW, THEREFORE, in consideration of the foregoing recitals, Buyer hereby certifies, agrees and acknowledges as follows:

1. No default or event of default with respect to Buyer, nor, to the knowledge of Buyer, any other party has occurred under the Energy Storage Agreement, and there are no defaults or unsatisfied conditions presently existing (or which would exist after the passage of time and/or giving of notice) that would allow the Project Company or Buyer to terminate the Energy Storage Agreement.

2. There exists no event or condition that would, either immediately or with the passage of time or giving of notice, or both, entitle either the Project Company or Buyer to suspend the performance of its obligations under the Energy Storage Agreement.
796
Exhibit U - 2

3. Each representation or warranty made or given by Buyer in Section ____ of the Energy Storage Agreement is complete, true and correct.

4. As of the date hereof, (i) the Energy Storage Agreement is in full force and effect and has not been assigned, amended, supplemented or modified, (ii) there are no pending or threatened disputes or legal proceedings between Buyer and the Project Company, (iii) there is no pending or, to the knowledge of Buyer, threatened action or proceeding involving or relating to Buyer before any court, tribunal, governmental authority or arbitrator which purports to affect the legality, validity or enforceability of the Energy Storage Agreement, (iv) Buyer is not aware of any event, act, circumstance or condition constituting an event of force majeure under the Energy Storage Agreement, and (v) the Project Company owes no indemnity payments or other amounts to Buyer under the Energy Storage Agreement.

5. The execution, delivery and performance by Buyer of this Estoppel Certificate have been duly authorized by all necessary action on the part of Buyer and do not require any approval or consent of any other person or entity and do not violate any provision of any law, regulation, order, judgment, injunction or similar matters or breach any agreement presently in effect with respect to or binding on Buyer.

6. Buyer agrees that any notices required to be delivered to Seller under Section [__] of the Energy Storage Agreement, including notices of an [Event of Default], shall be delivered by Buyer to each of the Class B Equity Investors at their respective notice addresses set forth on Exhibit A hereto, and Buyer agrees that the Class B Equity Investors shall have the right (but not the obligation) to cure the defaults listed in any notice of default in accordance with Section [__] of the Energy Storage Agreement within a cure period that is the same length as the cure period afforded to Seller under the Energy Storage Agreement with respect to such event (but in no event less than 90 days), and which starts on the later of (i) the same date that the Seller’s cure period expires under the Energy Storage Agreement or (ii) the date that the Class B Equity Investors receive such notice that lists the default or defaults of the Seller under the Energy Storage Agreement.

7. [Additional provisions to be included if necessary to clarify the Energy Storage Agreement.]

8. This Estoppel Certificate shall be governed by the laws of the State of New York, without regard to principles of conflict of law.
[Signature page follows]
797
Exhibit U - 3
IN WITNESS WHEREOF, Buyer has caused this Estoppel Certificate to be executed by its undersigned authorized officer as of the date first set forth above.
_______________________________
By: _____________________________
Name:

Title:
798

SAN DIEGO COMMUNITY POWER
Staff Report – Item 17
TO: Board of Directors
FROM: Kenny Key, Director of Power Contracts

VIA: Karin Burns, Chief Executive Officer
SUBJECT: Approve Energy Storage Service Agreement for the North Johnson Energy Center
DATE: June 26, 2025
RECOMMENDATION:

Approve the proposed 15-year Energy Storage Service Agreement with North Johnson Energy Center, LLC for a 50 MW/200 MWh, 4-hour battery energy storage facility and authorize the Chief Executive Officer to execute the agreement.

BACKGROUND:

As San Diego Community Power (Community Power) strives to meet its environmental, financial, and regulatory compliance goals and requirements, long-term contracts of at least 10 years in duration are integral components of its portfolio. Long-term contracts provide renewable generation and clean energy storage facility developers with the certain revenue stream against which they can finance up-front capital requirements, so each long-term contract that Community Power signs with a developing facility will underpin a new, incremental project. In addition, long-term contracts lock in energy and capacity supply around which Community Power can build its power supply portfolio while also providing power supply cost certainty around which Community Power can develop its pro forma financial model.

In D.21-06-025, the California Public Utilities Commission (CPUC) required each Load Serving Entity (LSE) in California to make significant long-term purchase commitments for resource adequacy from new, incremental generation and storage facilities that will achieve commercial operation during 2023 through 2026. Further, Decision 23-02-040 allowed LSEs to contract for long-lead time resources, including long duration storage, with commercial operations out into 2028 to meet its resource adequacy requirements.

The proposed Energy Storage Service Agreement (ESSA) is for capacity, energy arbitrage and ancillary services benefits from a 50 MW/200 MWh, 4-hour battery energy storage facility, the North Johnson Energy Center project (“NJEC”), being developed by Wellhead Electric Company, Inc. (“Wellhead”). The ESSA originated from an offer 799
Community Power received in late 2023 via its 2023 Request for Information for projects seeking to apply to the CAISO Transmission Planning Process in 2024. Community Power engaged with Wellhead after short-listing the project to work on ESSA terms.

The SDCP board approved the ESSA at the February 27, 2025 board meeting. However, after such approval, changes to the tariff structure left the project financially unviable as contracted. Staff worked with Wellhead to adjust the contract to remain viable and reached terms mutually agreeable to both parties.

ANALYSIS AND DISCUSSION:

Staff negotiated the attached full toll ESSA for the purchase of capacity, energy arbitrage and ancillary services from the NJEC project, which is a standalone battery storage project to be developed in San Diego County by Wellhead.

As previously reviewed with the Ad Hoc Energy Contracts Working Group, the ESSA provides for a Guaranteed Commercial Operations DDate of June 1, 2026, providing critical local resource adequacy for Community Power’s portfolio.

Below is additional information regarding Wellhead and the revised ESSA.

Background on Wellhead:
• Since 1985, Wellhead has been involved in the development, construction, completion and/or operation of twenty gas fired generation facilities (including four CHP), one landfill gas generation facility, several hybrid and energy storage projects, and multiple solar PV projects. Wellhead and/or its affiliates currently own and/or operate eleven generating projects totaling over 525 MW. • Notable recent projects from Wellhead include:
• Stanton Battery Energy Storage Project (“SBES”):
 Commercial in 2023, SBES consists of a 68.8 MW, 4-Hour battery energy storage system (“BESS”).
• Fresno Energy Storage 1 (“FES1”):
 Commercial in 2023, FES1 consists of a 16 MW, 1-Hour BESS, hybridized with an existing gas turbine.
• Stanton Energy Reliability Center (“SERC”):
 Commercial in 2020, SERC consists of a 98 MW, hybrid electric gas turbine. This project includes two GE LM6000 Gas Turbines and two ~10 MW, ½-Hour BESS’s. The gas turbines and BESS’s were integrated with Wellhead’s patented EGT hybrid control system.

Contract Overview – North Johnson Energy Center
• Project: 50 MW/200 MWh (4-hour) lithium-ion battery energy system • Project location: San Diego County, California
• Guaranteed commercial operation date: June 1, 2026
• Contract term: 15 years
• Pricing: Fixed capacity price adjusted for availability and verified capacity 800
• Community Power would receive financial compensation in the event of seller’s failure to successfully achieve certain development milestones as well as seller’s failure to meet guaranteed efficiency rates once the project is operational.

Revisions to Board Approved ESSA:
• Increased capacity price
• Increased number of daily cycles available to SDCP
• Modifications to the scheduling coordinator functions • Updated for slice of day resource adequacy requirements Community Benefits:
• Wellhead is committed to using union labor at the project and has entered into a Project Labor Agreement.
• Project development will bring approximately 130 clean-energy jobs throughout construction and will be staffed during operations by Wellhead's 6-person San Diego area O&M staff.
• Project is located in a disadvantaged community and will help displace local and regional gas-fired generation in peak hours and fewer renewable curtailments will occur.
• Wellhead is providing scholarships to local high schools for students continuing education in the areas of Science, Technology, Engineering and Math.

COMMITTEE REVIEW:

The ECWG approved the shortlisting of the NJEC project in December of 2023. Further, the ECWG approve the revised ESSA in June of 2025.

FISCAL IMPACT:

The competitive capacity pricing of the ESSA is confidential, but the long-term purchase of capacity, energy arbitration, and ancillary services will provide Community Power with significant value and cost certainty over the term of this ESSA.

ATTACHMENTS:

Attachment A: Energy Storage Service Agreement for the North Johnson Energy Center project
801
ITEM 17

ATTACHMENT A
802

CONFIDENTIAL

EXECUTION VERSION

ENERGY STORAGE SERVICE AGREEMENT

COVER SHEET
Seller: North Johnson Energy Center, LLC (“Seller”)
Buyer: San Diego Community Power, a California joint powers authority (“Buyer”) Description of Facility: A 50 MW-AC/200 MWh battery energy storage facility, located in San Diego County, in the State of California, as further described in Exhibit A.

Milestones:

Milestone Date for
Completion
Evidence of Site Control
Executed Interconnection Agreement
Guaranteed Construction Start Date January 15, 2026
Transmission Plan Deliverability Allocation Obtained
In-Service Date (back-feed)
Initial Synchronization/Commencement of Trial
Operations
Guaranteed Commercial Operation Date
Initial Showing Month August 1, 2026
Delivery Term: 15 Contract Years
Guaranteed Capacity: 50 MW-AC at four (4) hours of continuous discharge Dedicated Interconnection Capacity: 50 MW
Guaranteed Availability:

Guaranteed Efficiency Rate:

Contract Year Guaranteed
Efficiency Rate
1 – 15
803
Minimum Efficiency Rate:

Contract Price:

Contract Year Contract Price
1 – 15
Product:
☒ Buyer Discharging Energy
☒ Buyer Charging Energy

☒ Installed Capacity and Effective Capacity
☒ Ancillary Services
☒ Capacity Attributes
Scheduling Coordinator: Wellhead Power eXchange, LLC (pursuant to and subject to Exhibit D)
Security Amount:

Development Security:

Performance Security:
804

TABLE OF CONTENTS
Page
i
ARTICLE 1 DEFINITIONS ........................................................................................................ 1

1.1 Contract Definitions ............................................................................................... 1

1.2 Rules of Interpretation ......................................................................................... 21 ARTICLE 2 TERM; CONDITIONS PRECEDENT.................................................................. 22

2.1 Contract Term. ..................................................................................................... 22

2.2 Commercial Operation; Conditions Precedent .................................................... 22

2.3 Development; Construction; Progress Reports .................................................... 23

2.4 Remedial Action Plan .......................................................................................... 24

2.5 Pre-Commercial Operation Actions ..................................................................... 24 ARTICLE 3 PURCHASE AND SALE ...................................................................................... 24

3.1 Product ................................................................................................................. 24

3.2 Discharging Energy ............................................................................................. 25

3.3 Capacity Attributes .............................................................................................. 25

3.4 Ancillary Services. ............................................................................................... 25

3.5 Resource Adequacy Failure. ................................................................................ 26

3.6 Buyer’s Re-Sale of Product ................................................................................. 27

3.7 Compliance Expenditure Cap .............................................................................. 27 ARTICLE 4 OBLIGATIONS AND DELIVERIES ................................................................... 27

4.1 Delivery................................................................................................................ 27

4.2 Interconnection .................................................................................................... 27

4.3 Storage Availability and Efficiency ..................................................................... 27

4.4 Facility Testing .................................................................................................... 28

4.5 Testing Costs and Revenues ................................................................................ 29

4.6 Facility Operations ............................................................................................... 29

4.7 Dispatch Notices .................................................................................................. 30

4.8 Facility Unavailability to Receive Dispatch Notices ........................................... 30

4.9 Energy Management. ........................................................................................... 30

4.10 Capacity Availability Notice. ............................................................................... 32

4.11 [Reserved]. ........................................................................................................... 32

4.12 Outages ................................................................................................................ 32 ARTICLE 5 TAXES, GOVERNMENTAL COSTS .................................................................. 34

5.1 Allocation of Taxes and Charges ......................................................................... 34

5.2 Cooperation .......................................................................................................... 34 ARTICLE 6 MAINTENANCE AND REPAIR OF THE FACILITY ....................................... 35

6.1 Maintenance of the Facility. ................................................................................ 35

6.2 Maintenance of Health and Safety. ...................................................................... 35

6.3 Shared Facilities. .................................................................................................. 35 ARTICLE 7 METERING ........................................................................................................... 36

7.1 Metering. .............................................................................................................. 36 805
ii

7.2 Meter Verification. ............................................................................................... 36 ARTICLE 8 INVOICING AND PAYMENT; CREDIT ............................................................ 36

8.1 Invoicing .............................................................................................................. 36

8.2 Payment................................................................................................................ 37

8.3 Books and Records .............................................................................................. 37

8.4 Payment Adjustments; Billing Errors .................................................................. 37

8.5 Billing Disputes ................................................................................................... 38

8.6 Netting of Payments ............................................................................................. 38

8.7 Seller’s Development Security ............................................................................ 38

8.8 Seller’s Performance Security .............................................................................. 38

8.9 First Priority Security Interest in Cash or Cash Equivalent Collateral ................ 39

8.10 Financial Statements ............................................................................................ 39 ARTICLE 9 NOTICES .............................................................................................................. 40

9.1 Addresses for the Delivery of Notices ................................................................. 40

9.2 Acceptable Means of Delivering Notice .............................................................. 40 ARTICLE 10 FORCE MAJEURE ............................................................................................. 41

10.1 Definition ............................................................................................................. 41

10.2 No Liability If a Force Majeure Event Occurs .................................................... 42

10.3 Notice ................................................................................................................... 42

10.4 Termination Following Force Majeure Event ...................................................... 42 ARTICLE 11 DEFAULTS; REMEDIES; TERMINATION ..................................................... 43

11.1 Events of Default ................................................................................................. 43

11.2 Remedies; Declaration of Early Termination Date. ............................................. 45

11.3 Damage Payment; Termination Payment ............................................................ 46

11.4 Notice of Payment of Termination Payment or Damage Payment ...................... 47

11.5 Disputes With Respect to Termination Payment or Damage Payment ............... 47

11.6 Limitation on Seller’s Ability to Make or Agree to Third-Party Sales from the Facility after Early Termination Date ............................................................ 47

11.7 Rights And Remedies Are Cumulative ................................................................ 48

11.8 Mitigation ............................................................................................................. 48 ARTICLE 12 LIMITATION OF LIABILITY AND EXCLUSION OF WARRANTIES ........ 48

12.1 No Consequential Damages ................................................................................. 48

12.2 Waiver and Exclusion of Other Damages ............................................................ 48 ARTICLE 13 REPRESENTATIONS AND WARRANTIES; COVENANTS ......................... 49

13.1 Seller’s Representations and Warranties ............................................................. 49

13.2 Buyer’s Representations and Warranties ............................................................. 50

13.3 General Covenants ............................................................................................... 51

13.4 Seller’s Covenants ............................................................................................... 51 ARTICLE 14 ASSIGNMENT.................................................................................................... 52 806
iii

14.1 General Prohibition on Assignments ................................................................... 52

14.2 Collateral Assignment .......................................................................................... 53

14.3 Permitted Assignment .......................................................................................... 53

14.4 Portfolio Financing .............................................................................................. 53

14.5 Buyer Financing Assignment ............................................................................... 54 ARTICLE 15 DISPUTE RESOLUTION ................................................................................... 54

15.1 Governing Law. ................................................................................................... 54

15.2 Dispute Resolution. .............................................................................................. 54

15.3 Attorneys’ Fees. ................................................................................................... 54 ARTICLE 16 INDEMNIFICATION ......................................................................................... 54

16.1 Indemnification. ................................................................................................... 54

16.2 Claims. ................................................................................................................. 55 ARTICLE 17 INSURANCE ...................................................................................................... 56

17.1 Insurance .............................................................................................................. 56 ARTICLE 18 CONFIDENTIAL INFORMATION ................................................................... 57

18.1 Definition of Confidential Information ................................................................ 57

18.2 Duty to Maintain Confidentiality ......................................................................... 57

18.3 Irreparable Injury; Remedies ............................................................................... 58

18.4 Further Permitted Disclosure ............................................................................... 59

18.5 Press Releases ...................................................................................................... 59 ARTICLE 19 MISCELLANEOUS ............................................................................................ 59

19.1 Entire Agreement; Integration; Exhibits .............................................................. 59

19.2 Amendments ........................................................................................................ 59

19.3 No Waiver ............................................................................................................ 59

19.4 No Agency, Partnership, Joint Venture or Lease ................................................. 59

19.5 Severability .......................................................................................................... 59

19.6 Mobile-Sierra ....................................................................................................... 60

19.7 Counterparts ......................................................................................................... 60

19.8 Electronic Delivery .............................................................................................. 60

19.9 Binding Effect ...................................................................................................... 60

19.10 No Recourse to Members of Buyer ..................................................................... 60

19.11 Forward Contract ................................................................................................. 60

19.12 Change in Electric Market Design ....................................................................... 61

19.13 Further Assurances............................................................................................... 61 Exhibits:

Exhibit A Facility Description
Exhibit B Facility Construction and Commercial Operation Exhibit C Compensation
Exhibit D Scheduling Coordinator Responsibilities
Exhibit E Progress Reporting Form
807
iv
Exhibit F Form of Monthly Expected Available Capacity Report Exhibit G Form of Daily Availability Notice
Exhibit H Form of Commercial Operation Date Certificate Exhibit I Form of Capacity and Efficiency Rate Test Certificate Exhibit J Form of Construction Start Date Certificate
Exhibit K Form of Letter of Credit
Exhibit L [Reserved]
Exhibit M Form of Replacement RA Notice
Exhibit N Notices
Exhibit O Capacity and Efficiency Rate Tests
Exhibit P Facility Availability Calculation
Exhibit Q Operating Restrictions
Exhibit R Metering Diagram
Exhibit S Workforce Development
Exhibit T Collateral Assignment Agreement
808
1 ENERGY STORAGE SERVICE AGREEMENT
This Energy Storage Service Agreement (“Agreement”) is entered into as of __________, 2025 (the “Effective Date”), between Buyer and Seller. Buyer and Seller are sometimes referred to herein individually as a “Party” and jointly as the “Parties.” All capitalized terms used in this Agreement are used with the meanings ascribed to them in Article 1 to this Agreement.

RECITALS
WHEREAS, Seller intends to develop, design, construct, own, and operate the Facility; and
WHEREAS, Seller desires to sell, and Buyer desires to purchase, on the terms and conditions set forth in this Agreement, the Product;
NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, and for other good and valuable consideration, the sufficiency and adequacy of which are hereby acknowledged, the Parties agree to the following:

ARTICLE 1

DEFINITIONS

1.1 Contract Definitions. The following terms, when used herein with initial capitalization, shall have the meanings set forth below:
“AC” means alternating current.
“Accepted Compliance Costs” has the meaning set forth in Section 3.7(c). “Administrative NQC Reduction” means a reduction in the maximum achievable Net Qualifying Capacity of the Facility due to (a) a reduction that has been generally applied to resources materially similar to the Facility in terms of type, market and operational characteristics (including those characteristics specified in the CPUC Master Resource Database), including any methodology that incorporates fleet averages or other average outage rates, or (b) a reduction that is specifically applied based on the operational characteristics of the Facility (e.g. any changes with respect to storage duration requirements) to the extent such reduction is not caused by Seller’s failure to meet its obligations under this Agreement.
“Affiliate” means, with respect to any Person, each Person that directly or indirectly controls, is controlled by, or is under common control with such designated Person. For purposes of this definition and the definition of “Permitted Transferee”, “control” (including, with correlative meanings, the terms “controlled by” and “under common control with”), as used with respect to any Person, shall mean (a) the direct or indirect right to cast at least fifty percent (50%) of the votes exercisable at an annual general meeting (or its equivalent) of such Person or, if there are no such rights, ownership of at least fifty percent (50%) of the equity or other ownership 809
2 interest in such Person, or (b) the right to direct the policies or operations of such Person.

Notwithstanding the foregoing, the Parties hereby agree and acknowledge that with respect to Buyer the public entities designated as members or participants under the Joint Powers Agreement creating Buyer shall not constitute or otherwise be deemed an “Affiliate” for purposes of this Agreement.
“Agreement” has the meaning set forth in the Preamble and includes the Cover Sheet and any Exhibits, schedules and any written supplements hereto. “Alternative Dispatch” has the meaning set forth in Section 4.6(b). “Ancillary Services” means frequency regulation, spinning reserve, non-spinning reserve, regulation up, regulation down, voltage support, and any other ancillary services, in each case that the Facility is capable of providing consistent with the Operating Restrictions set forth in Exhibit Q, as each is defined in the CAISO Tariff.
“Automated Dispatch System” or “ADS” has the meaning set forth in the CAISO Tariff. “Automatic Generation Control” or “AGC” has the meaning set forth in the CAISO Tariff.
“Availability Adjustment” has the meaning set forth in Exhibit C. “Availability Notice” has the meaning set forth in Section 4.10. “Availability Standards” has the meaning set forth in the CAISO Tariff or such other similar term as modified and approved by FERC hereafter to be incorporated in the CAISO Tariff. “Available Capacity” means the capacity of the Facility, expressed in whole MWs, that is mechanically available to charge and discharge Energy and provide Ancillary Services. “Bankrupt” or “Bankruptcy” means with respect to any entity, such entity that (a) files a petition or otherwise commences, authorizes or acquiesces in the commencement of a proceeding or cause of action under any bankruptcy, insolvency, reorganization or similar Law, (b) has any such petition filed or commenced against it which remains unstayed or undismissed for a period of ninety (90) days, (c) makes an assignment or any general arrangement for the benefit of creditors, (d) otherwise becomes bankrupt or insolvent (however evidenced), (e) has a liquidator, administrator, receiver, trustee, conservator or similar official appointed with respect to it or any substantial portion of its property or assets, or (f) is generally unable to pay its debts as they fall due.
“Battery Charging Factor” means a fraction, the numerator of which is the amount of Charging Energy absorbed by the Facility after the first five (5) hours of the charging phase of the applicable Capacity Test, and the denominator of which is the Effective Capacity. “Battery Discharging Factor” means one (1) minus a fraction, the numerator of which is the amount of Discharging Energy discharged during the first four (4) hours of the discharging phase of the applicable Capacity Test, and the denominator of which is the Effective Capacity. 810
3 “Business Day” means any day except a Saturday, Sunday, or a Federal Reserve Bank holiday in California. A Business Day begins at 8:00 a.m. and ends at 5:00 p.m. local time for the Party sending a Notice, or payment, or performing a specified action. “Buyer” has the meaning set forth on the Cover Sheet.
“Buyer Charging Energy” means Charging Energy received pursuant to a Charging Notice.
“Buyer Default” means a failure by Buyer to perform Buyer’s obligations hereunder, and includes an Event of Default of Buyer.
“Buyer Dispatched Test” has the meaning in Section 4.4(c). “Buyer Discharging Energy” means all Discharging Energy delivered pursuant to a Discharging Notice.
“Buyer’s Indemnified Parties” has the meaning set forth in Section 16.1(a). “CAISO” means the California Independent System Operator Corporation or any successor entity performing similar functions.
“CAISO Approved Meter” means a CAISO approved revenue quality meter or meters, CAISO approved data processing gateway or remote intelligence gateway, telemetering equipment and data acquisition services sufficient for monitoring, recording and reporting, in real time, all Charging Energy and Discharging Energy delivered to or from the Delivery Point. “CAISO Balancing Authority Area” has the meaning set forth in the CAISO Tariff. “CAISO Certification” means the certification and testing requirements for a storage unit set forth in the CAISO Tariff that are applicable to the Facility, including certification and testing for all applicable Ancillary Services, PMAX, and PMIN.
“CAISO Charges Invoice” has the meaning set forth in Exhibit D. “CAISO Dispatch” means any Charging Notice or Discharging Notice given by the CAISO to the Facility, whether through ADS, AGC or any successor communication protocol, communicating an Ancillary Service Award (as defined in the CAISO Tariff) or directing the Facility to charge or discharge at a specific MW rate for a specified period of time or amount of MWh.
“CAISO Grid” has the same meaning as “CAISO Controlled Grid” as defined in the CAISO Tariff.
“CAISO Tariff” means the California Independent System Operator Corporation Agreement and Tariff, Business Practice Manuals (BPMs), and Operating Procedures, as the same may be amended or modified from time-to-time and approved by FERC. 811
4 “Capacity Attribute” means any current or future defined characteristic, certificate, tag, credit, or accounting construct associated with the ability of the Facility to charge, discharge and deliver to the Delivery Point at a particular moment and that can be purchased, sold or conveyed under CAISO or CPUC market rules, including Resource Adequacy Benefits. “Capacity Damages” has the meaning set forth in Section 6 of Exhibit B. “Capacity Test” or “CT” means any test or retest of the Facility to establish the Installed Capacity, Effective Capacity, or Efficiency Rate or any other test conducted pursuant to Exhibit O.
“CEQA” means the California Environmental Quality Act.
“Change of Control” means a transaction or series of transactions where Wellhead Electric Company, WPower LLC, WPower Management Corporation or an Affiliate thereof which directly or indirectly have the power to control the management and policies of Seller prior to such transaction or series of transactions, ceases to directly or indirectly have the power to control the management and policies of Seller as a result of such transaction or series of transactions; provided that to the extent any of the foregoing entities cease to directly or indirectly continue to control the management and policies of Seller to accommodate any cash equity or tax equity transaction, such a change shall not constitute a Change of Control.
“Charging Energy” means the Energy delivered to the Facility, as measured at the Facility Metering Point by the Facility Meter, as such meter readings are adjusted by the CAISO for any applicable Electrical Losses and Station Use. All Charging Energy shall be used solely to charge the Facility.
“Charging Notice” means the operating instruction, and any subsequent updates, given by Buyer, the Facility SC or the CAISO, directing the Facility to charge at a specific MW rate for a specified period of time or to a specified Stored Energy Level; provided, any such operating instruction shall be in accordance with the Operating Restrictions and the CAISO Tariff. For avoidance of doubt, any charging instructions made in connection with Seller’s Dispatch Rights shall not be considered a Charging Notice. Any instruction to charge the Facility pursuant to a Buyer Dispatched Test shall be considered a Charging Notice. “Collateral Assignment Agreement” has the meaning set forth in Section 14.2 and substantially in the form attached as Exhibit T.
“Commercial Operation” has the meaning set forth in Exhibit B. “Commercial Operation Capacity Test” means the Capacity Test conducted in connection with Commercial Operation of the Facility, including any additional Capacity Test for additional capacity installed after the Commercial Operation Date pursuant to Section 6 of Exhibit B.
“Commercial Operation Date” or “COD” has the meaning set forth in Exhibit B. 812
5 “Commercial Operation Delay Damages” means an amount equal to (a) the Development Security amount required hereunder, divided by (b) “Communications Protocols” means certain Operating Restrictions developed by the Parties pursuant to Exhibit Q that involve procedures and protocols regarding communication with respect to the operation of the Facility pursuant to this Agreement. “Compliance Actions” has the meaning set forth in Section 3.7(a). “Compliance Expenditure Cap” has the meaning set forth in Section 3.7. “Confidential Information” has the meaning set forth in Section 18.1. “Construction Start” has the meaning set forth in Exhibit B. “Construction Start Date” has the meaning set forth in Exhibit B. “Contract Price” has the meaning set forth on the Cover Sheet. “Contract Term” has the meaning set forth in Section 2.1(a). “Contract Year” means a period of twelve (12) consecutive months. The first Contract Year shall commence on the Commercial Operation Date and each subsequent Contract Year shall commence on the anniversary of the Commercial Operation Date. “Costs” means, with respect to the Non-Defaulting Party, brokerage fees, commissions, breakage, recapture, prepayment and other similar third-party transaction costs and expenses reasonably incurred by such Party either in terminating or repaying any arrangement pursuant to which it has hedged its obligations or entering into new arrangements (including any such hedging arrangements) which replace the Agreement; and all reasonable attorneys’ fees and expenses incurred by the Non-Defaulting Party in connection with terminating the Agreement. “Cover Sheet” means the cover sheet to this Agreement, which is incorporated into this Agreement.
“CPM Soft Offer Cap” has the meaning set forth in the CAISO Tariff. “CPUC” means the California Public Utilities Commission, or any successor entity performing similar functions.
“Credit Rating” means, with respect to any entity, the rating then assigned to such entity’s unsecured, senior long-term debt obligations (not supported by third party credit enhancements) or if such entity does not have a rating for its senior unsecured long-term debt, then the rating then assigned to such entity as an issuer rating by S&P or Moody’s. If ratings by S&P and Moody’s are not equivalent, the lower rating shall apply.
“Cure Plan” has the meaning set forth in Section 11.1(b)(iii). “Curtailment Order” means any of the following:
813
6 (a) CAISO orders, directs, alerts, or provides notice to a Party, including a CAISO Operating Order, to curtail deliveries of Charging Energy or Discharging Energy for the following reasons: (i) any System Emergency, (ii) any warning of an anticipated System Emergency, or warning of an imminent condition or situation, which jeopardizes CAISO’s electric system integrity or the integrity of other systems to which CAISO is connected, or (iii) for any other reason;
(b) a curtailment ordered by the Transmission Provider for reasons including, but not limited to, (i) any situation that affects normal function of the electric system including, but not limited to, any abnormal condition that requires action to prevent circumstances such as equipment damage, loss of load, or abnormal voltage conditions, (ii) any warning, forecast or anticipation of conditions or situations that jeopardize the Transmission Provider’s electric system integrity or the integrity of other systems to which the Transmission Provider is connected, or (iii) any public safety power shutoff or equivalent curtailment to address wildfire or related risks; (c) a curtailment ordered by CAISO or the Transmission Provider due to a Transmission System Outage; or
(d) a curtailment in accordance with Seller’s obligations or limitations under its Interconnection Agreement with the Transmission Provider or distribution operator. “Daily Delay Damages” means an amount equal to (a) the Development Security amount required hereunder, divided by (b)
“Damage Payment” means the amount to be paid by the Defaulting Party to the Non-Defaulting Party after a Terminated Transaction occurring prior to the Commercial Operation Date, in a dollar amount set forth in Section 11.3(a).
“Day-Ahead Market” has the meaning set forth in the CAISO Tariff. “Day-Ahead Schedule” has the meaning set forth in the CAISO Tariff. “Deemed Delivered RA” means for the applicable Showing Month the amount of Net Qualifying Capacity expressed in MW that the Facility would have delivered to the Delivery Point, but for (i) a Force Majeure Event, and/or (ii) Planned Outages permitted by the terms of this Agreement to the extent such Planned Outages reduce the maximum achievable Net Qualifying Capacity of the Facility.
“Dedicated Interconnection Capacity” means an instantaneous amount of Charging Energy, Buyer Charging Energy, Buyer Discharging Energy and/or Discharging Energy, as applicable, that is permitted to be delivered from and/or to the Delivery Point under Seller’s Interconnection Agreement, in the amount of MWs as set forth on the Cover Sheet. “Defaulting Party” has the meaning set forth in Section 11.1(a). “Delivered RA” means the sum of (a) the Net Qualifying Capacity of the Facility for such month able to be shown on Buyer’s monthly or annual Resource Adequacy Plan to the CAISO and 814
7 CPUC and counted as Resource Adequacy Capacity by both the CAISO and CPUC, (b) Deemed Delivered RA and (c) Replacement RA.
“Deliverability” has the meaning set forth in the CAISO Tariff. “Deliverability Allocation Date” means the date on which Seller notifies Buyer that CAISO has confirmed to Seller’s reasonable satisfaction that the Facility has been allocated Deliverability which is sufficient, in Seller’s reasonable judgment, to finance and construct the Facility, but which is no less than 50 MW.
“Deliverability Status” means the receipt and designation by CAISO of either Interim Deliverability Status or Full Capacity Deliverability Status with no contingencies. “Delivery Point” means the PNode assigned to the Facility by the CAISO. “Delivery Term” shall mean the period of Contract Years set forth on the Cover Sheet beginning on the Guaranteed Commercial Operation Date, unless terminated earlier in accordance with the terms and conditions of this Agreement.
“Development Cure Period” has the meaning set forth in Exhibit B. “Development Security” means (a) cash or (b) a Letter of Credit in the amount set forth on the Cover Sheet.
“Discharging Energy” means all Energy delivered from the Facility to the Delivery Point during any Settlement Interval or Settlement Period, as measured at the Facility Metering Point by the Facility Meter, as such meter readings are adjusted by the CAISO for Station Use and Electrical Losses to the Delivery Point.
“Discharging Notice” means the operating instruction, and any subsequent updates, given by Buyer, the Facility SC, or the CAISO, directing the Facility to discharge Discharging Energy at a specific MW rate for a specified period of time or to a specified Stored Energy Level; provided, any such operating instruction or updates shall be in accordance with the Operating Restrictions and the CAISO Tariff. For avoidance of doubt, any discharging instructions made in connection with Seller’s Dispatch Rights shall not be considered a Discharging Notice. Any instruction to discharge the Facility pursuant to a Buyer Dispatched Test shall be considered a Discharging Notice.
“Disclosing Party” has the meaning set forth in Section 18.2. “Dispatch Notice” means any Charging Notice, Discharging Notice and any subsequent updates thereto, given by the CAISO or Buyer to Seller or the Facility SC, directing the Facility to charge or discharge Energy at a specific MWh rate, for a specified period of time, and/or to a specified Stored Energy Level; provided, any such operating instruction or updates shall be in accordance with the Operating Restrictions. For avoidance of doubt, any instructions made in connection with Seller’s Dispatch Rights shall not be considered a Dispatch Notice. “Early Termination Date” has the meaning set forth in Section 11.2(a). 815
8 “Effective Capacity” means the lesser of (a) PMAX, and (b) maximum dependable operating capacity of the Facility to discharge Energy for four (4) hours of continuous discharge, as measured in MW at the Delivery Point (i.e., measured at the Facility Meter and adjusted for Electrical Losses to the Delivery Point to the extent such Electrical Losses are not already reflected in the Facility Meter measurements) as determined pursuant to the most recent Capacity Test (including the Commercial Operation Capacity Test), and as evidenced by a certificate substantially in the form attached as Exhibit I hereto, in either case (a) or (b) up to but not in excess of (i) the Guaranteed Capacity (with respect to a Commercial Operation Capacity Test) or (ii) the Installed Capacity (with respect to any other Capacity Test). “Effective Date” has the meaning set forth in the Preamble. “Effective Flexible Capacity” or “EFC” has the meaning set forth in the CAISO Tariff. “Efficiency Rate” means the tested rate calculated pursuant to Sections II.I(2) and III(A) of Exhibit O by dividing Discharging Energy by Charging Energy. “Electrical Losses” means, subject to meeting any applicable CAISO requirements and in accordance with Section 7.1, all transmission or transformation losses (a) between the Delivery Point and the Facility Metering Point associated with delivery of Charging Energy, and (b) between the Facility Metering Point and the Delivery Point associated with delivery of Discharging Energy.
“Emission Reduction Credits” or “ERCs” means emission reductions that have been authorized by a local air pollution control district pursuant to California Division 26 Air Resources; Health and Safety Code Sections 40709 and 40709.5, whereby a district has established a system by which all reductions in the emission of air contaminants that are to be used to offset certain future increases in the emission of air contaminants shall be banked prior to use to offset future increases in emissions.
“Energy” means electrical energy, measured in kilowatt-hours, megawatt-hours, or multiple units thereof.
“Energy Management System” or “EMS” means the Facility’s energy management system.
“Energy Tolling Period” has the meaning set forth in Section 2.2. “Energy Tolling Resource” means the Facility is being operated in a manner in which Seller will make available, charge and discharge, deliver, and sell electricity therefrom to Buyer when and as the Facility is available, subject to the terms and conditions of this Agreement, including the Operating Restrictions.
“Environmental Cost” means costs incurred in connection with acquiring and maintaining all environmental permits and licenses for the Facility, and the Facility’s compliance with all applicable environmental laws, rules and regulations, including capital costs for pollution mitigation or installation of emissions control equipment required to permit or license the Facility, all operating and maintenance costs for operation of pollution mitigation or control equipment, 816
9 costs of permit maintenance fees and emission fees as applicable, the costs of all Emission Reduction Credits or Marketable Emission Trading Credits required by any applicable environmental laws, rules, regulations, and permits to operate the Facility, and the costs associated with the disposal and clean-up of hazardous substances introduced to the Site, and the decontamination or remediation, on or off the Site, necessitated by the introduction of such hazardous substances on the Site.
“Event of Default” has the meaning set forth in Section 11.1. “Excused Event” has the meaning set forth in Exhibit P. “Extension Term” has the meaning set forth in Section 2.1(b). “Facility” means the energy storage facility described on the Cover Sheet and in Exhibit A, located at the Site and including the Energy Management System and mechanical equipment and associated facilities and equipment required to deliver Product (but excluding any Shared Facilities), as such storage facility may be expanded or otherwise modified from time to time in accordance with the terms hereof.
“Facility Meter” means a CAISO Approved Meter, along with a CAISO-approved data processing gateway or remote intelligence gateway, telemetering equipment and data acquisition services sufficient for monitoring, recording and reporting, in real time, the amount of Charging Energy delivered to the Facility Metering Point and the amount of Discharging Energy discharged from the Facility at the Facility Metering Point to the Delivery Point for the purpose of invoicing in accordance with Section 8.1. The Facility may contain multiple measurement devices that will make up the Facility Meter, and, unless otherwise indicated, references to the Facility Meter shall mean all such measurement devices and the aggregated data of all such measurement devices, taken together.
“Facility Metering Point” means the location(s) of the Facility Meter shown in Exhibit R. “Facility SC” means (i) as of the Effective Date, Wellhead Power Exchange, LLC, or (ii) if Buyer has revoked its selection of Seller as the responsible Party for Scheduling Coordinator Services in accordance with Exhibit D, then, either Buyer or Buyer’s designee acting as the Facility’s Scheduling Coordinator.
“FERC” means the Federal Energy Regulatory Commission or any successor government agency.
“Flexible Capacity” has the meaning set forth in the CAISO Tariff. “Flexible Capacity Category” has the meaning set forth in the CAISO Tariff. “Flexible RAR” means the flexible capacity requirements established for load-serving entities by the CAISO pursuant to the CAISO Tariff, the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority.
“Force Majeure Event” has the meaning set forth in Section 10.1. 817
10 “Full Capacity Deliverability Status” or “FCDS” has the meaning set forth in the CAISO Tariff.
“Gains” means, with respect to any Party, an amount equal to the present value of the economic benefit to it, if any (exclusive of Costs), resulting from the termination of this Agreement for the remaining Contract Term, determined in a commercially reasonable manner. Factors used in determining the economic benefit to a Party may include, without limitation, reference to information supplied by one or more third parties, which shall exclude Affiliates of the Non-Defaulting Party, including without limitation, quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., NP-15), all of which should be calculated for the remaining Contract Term, and include the value of Capacity Attributes.
“Governmental Authority” means any federal, state, provincial, local or municipal government, any political subdivision thereof or any other governmental, congressional or parliamentary, regulatory, or judicial instrumentality, authority, body, agency, department, bureau, or entity with authority to bind a Party at law, including CAISO and CPUC; provided, “Governmental Authority” shall not in any event include any Party. “Guaranteed Availability” means the minimum guaranteed Monthly Capacity Availability of the Facility in each month of the Delivery Term, as set forth on the Cover Sheet. “Guaranteed Capacity” means the maximum dependable operating capability of the Facility to discharge electric energy, as measured in MW AC at the Delivery Point for four (4) hours of continuous discharge, as set forth on the Cover Sheet. “Guaranteed Commercial Operation Date” means the date set forth on the Cover Sheet, as such date may be extended pursuant to Exhibit B.
“Guaranteed Construction Start Date” means the date set forth on the Cover Sheet, as such date may be extended pursuant to Exhibit B.
“Guaranteed Efficiency Rate” means the guaranteed Efficiency Rate of the Facility in each Contract Year of the Delivery Term, as set forth on the Cover Sheet. “Guaranteed RA Amount” means the Qualifying Capacity of the Facility based upon the Effective Capacity, as determined by the CPUC, minus Administrative NQC Reduction in the applicable Showing Month.
“Guarantor” means, with respect to Seller, any Person that (a) does not already have any material credit exposure to Buyer under any other agreements, guarantees, or other arrangements at the time its Guaranty is issued, (b) is an Affiliate of Seller, or other third party reasonably acceptable to Buyer, (c) has a Credit Rating of
, (d) has a tangible net worth of at least
, (e) is incorporated or organized in a jurisdiction of the United States and is in 818
11 good standing in such jurisdiction, and (f) executes and delivers a Guaranty for the benefit of Buyer.
“Guaranty” means a guaranty from a Guarantor provided for the benefit of Buyer substantially in the form attached as Exhibit L.
“Hazardous Substance” means, collectively, (a) any chemical, material or substance that is listed or regulated under applicable Laws as a “hazardous” or “toxic” substance or waste, or as a “contaminant” or “pollutant” or words of similar import, (b) any petroleum or petroleum products, flammable materials, explosives, radioactive materials, asbestos, urea formaldehyde foam insulation, and transformers or other equipment that contain polychlorinated biphenyls, and (c) any other chemical or other material or substance, exposure to which is prohibited, limited or regulated by any Laws.
“Imbalance Energy” means the amount of Energy in MWh, in any given Settlement Period or Settlement Interval, by which the amount of Charging Energy or Discharging Energy, as applicable, deviates from the amount of Scheduled Energy. “Indemnified Party” shall mean (i) Buyer, with respect to all third-party claims, demands, losses, liabilities, penalties, and expenses arising out of, resulting from, or caused by the circumstances described in Section 16.1(a), and (ii) Seller, with respect to all third-party claims, demands, losses, liabilities, penalties, and expenses arising out of, resulting from, or caused by the circumstances described in Section 16.1(b).
“Indemnifying Party” shall mean (i) Seller, with respect to all third-party claims, demands, losses, liabilities, penalties, and expenses arising out of, resulting from, or caused by the circumstances described in Section 16.1(a), and (ii) Buyer, with respect to all third-party claims, demands, losses, liabilities, penalties, and expenses arising out of, resulting from, or caused by the circumstances described in Section 16.1(b).
“Initial Showing Month” means August 2026; provided however, if the Guaranteed Commercial Operation Date is extended as set forth in Exhibit B, the Initial Showing Month shall be the first month following the Commercial Operation Date that the Facility SC is capable of including the Resource Adequacy Benefits from the Facility on a Supply Plan. “Initial Synchronization” means the commencement of Trial Operations (as defined in the CAISO Tariff).
“Installed Capacity” means the lesser of (a) PMAX, and (b) maximum dependable operating capacity of the Facility to discharge Energy for four (4) hours of continuous discharge, as measured in MW AC at the Facility Meter Point by the Facility Meter and adjusted for Electrical Losses to the Delivery Point (to the extent such Electrical Losses are not already reflected in the Facility Meter measurements), that achieves Commercial Operation, as evidenced by a certificate substantially in the form attached as Exhibit I hereto, as such capacity may be adjusted pursuant to Section 6 of Exhibit B, but in either case (a) or (b) up to but not in excess of the Guaranteed Capacity.
“Insurable Force Majeure Event” means any Force Majeure Event which results in direct, physical loss to the Facility.
819
12 “Interim Deliverability Notice” has the meaning set forth in Section 3.3(d). “Interim Deliverability Period” has the meaning set forth in Section 3.3(d). “Interim Deliverability Status” has the meaning set forth in the CAISO Tariff. “Inter-SC Trade” has the meaning set forth in the CAISO Tariff. “Interconnection Agreement” means the interconnection agreement(s) entered into by Seller or a Seller Affiliate pursuant to which the Facility will be interconnected with the Transmission System, providing for interconnection capacity available or allocable to the Facility that is no less than the Dedicated Interconnection Capacity, and pursuant to which Seller’s Interconnection Facilities and any other Interconnection Facilities will be constructed, operated and maintained during the Contract Term.
“Interconnection Delay” has the meaning set forth in Section 4 of Exhibit B. “Interconnection Facilities” means the interconnection facilities, control and protective devices and metering facilities required to connect the Facility with the Transmission System in accordance with the Interconnection Agreement.
“Interconnection Point” has the meaning set forth in Exhibit A. “Interest Rate” has the meaning set forth in Section 8.2. “ITC” means the investment tax credit established pursuant to Section 48 or other applicable provisions of the United States Internal Revenue Code of 1986. “Joint Powers Act” means the Joint Exercise of Powers Act of the State of California (Government Code Section 6500 et seq.).
“Joint Powers Agreement” means that certain Joint Powers Agreement dated October 1, 2019, as amended from time to time, under which Buyer is organized as a Joint Powers Authority in accordance with the Joint Powers Act.
“kWh” means a kilowatt-hour measured in alternating current, unless expressly stated in terms of direct current.
“Law” means any applicable law, statute, rule, regulation, decision, writ, order, decree or judgment, permit or any interpretation thereof, promulgated or issued by a Governmental Authority.
“Lender” means, collectively, any Person (a) providing senior or subordinated construction, interim, letter of credit, back leverage or long-term debt, equity or tax equity financing or refinancing for or in connection with the development, construction, purchase, installation or operation of the Facility, whether that financing or refinancing takes the form of private debt (including back-leverage debt), equity (including tax equity), public debt or any other form (including financing or refinancing provided to a member or other direct or indirect owner 820
13 of Seller), including any Person directly or indirectly providing financing or refinancing for the Facility or purchasing equity ownership interests of Seller and/or its Affiliates, and any trustee or agent or similar representative acting on their behalf, (b) providing interest rate or commodity protection under an agreement hedging or otherwise mitigating the cost of any of the foregoing obligations and/or (c) participating in a lease financing (including a sale leaseback, pass-through lease or leveraged leasing structure) with respect to the Facility. “Letter(s) of Credit” means one or more irrevocable, standby letters of credit issued by (i) Zions Bancorporation, N.A or (ii) The Bank of Nova Scotia, New York Agency or (iii) a U.S. commercial bank or a foreign bank with a U.S. branch with such bank (a) having a Credit Rating of at least A- with an outlook designation of “stable” from S&P or A3 with an outlook designation of “stable” from Moody’s or (b) being reasonably acceptable to Buyer, in a form substantially similar to the letter of credit set forth in Exhibit K. To the extent Seller’s preferred standby letter of credit issuer requests reasonable changes to the form of Exhibit K, Buyer will endeavor to accommodate such requested changes in good faith.
“Licensed Professional Engineer” means an independent, professional engineer selected by Seller and reasonably acceptable to Buyer, licensed in the State of California. “Local Capacity Area Resource” has the meaning set forth in the CAISO Tariff. “Local RAR” means the local Resource Adequacy Requirements established for load-serving entities by the CAISO pursuant to the CAISO Tariff, the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority. “Local RAR” may also be known as local area reliability, local resource adequacy, local resource adequacy procurement requirements, or local capacity requirement in other regulatory proceedings or legislative actions. “Losses” means, with respect to any Party, an amount equal to the present value of the economic loss to it, if any (exclusive of Costs), resulting from termination of this Agreement for the remaining Contract Term, determined in a commercially reasonable manner. Factors used in determining economic loss to a Party may include, without limitation, reference to information supplied by one or more third parties, which shall exclude Affiliates of the Non-Defaulting Party, including without limitation, quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., NP-15), all of which should be calculated for the remaining Contract Term and must include the value of Capacity Attributes. “Marketable Emission Trading Credits” means emissions trading credits or units pursuant to the requirements of California Division 26 Air Resources; Health & Safety Code Section 39616 and Section 40440.2 for market-based incentive programs such as the South Coast Air Quality Management District’s Regional Clean Air Incentives Market, also known as RECLAIM, and allowances of sulfur dioxide trading credits as required under Title IV of the Federal Clean Air Act (42 U.S.C. § 7651b (a) to (f)).
“Master File” has the meaning set forth in the CAISO Tariff. 821
14 “Maximum Charging Capacity” means the highest level at which the Facility may be charged, expressed in MW and as set forth in Exhibit Q. “Maximum Discharging Capacity” means the highest level at which the Facility may be discharged, expressed in MW and as set forth in Exhibit Q. “Milestones” means the development activities for significant permitting, interconnection, and construction milestones set forth on the Cover Sheet. “Minimum Efficiency Rate” means the percentage specified on the Cover Sheet. “Monthly Capacity Availability” has the meaning set forth in Exhibit P. “Monthly Capacity Payment” means the payment required to be made by Buyer to Seller each month of the Delivery Term as compensation for the Product, as calculated in accordance with Exhibit C.
“Moody’s” means Moody’s Investors Service, Inc., or its successor. “Must Offer Obligations” means the obligations to offer the Net Qualifying Capacity in order to satisfy Resource Adequacy Requirements, including under Section 40.6 of the CAISO Tariff.
“MW” means megawatts in alternating current, unless expressly stated in terms of direct current.
“MWh” means megawatt-hour measured in alternating current, unless expressly stated in terms of direct current.
“NERC” means the North American Electric Reliability Corporation, or any successor entity performing similar functions.
“Net Qualifying Capacity” or “NQC” has the meaning set forth in the CAISO Tariff. “Network Upgrades” has the meaning set forth in the CAISO Tariff. “Non-Defaulting Party” has the meaning set forth in Section 11.2. “Notice” shall, unless otherwise specified in the Agreement, mean written communications by a Party to be delivered by hand delivery, United States mail, overnight courier service, or electronic messaging (e-mail).
“Notification Deadline” in respect of a Showing Month shall be fifteen (15) Business Days before the relevant deadlines for the corresponding RA Compliance Showings for such Showing Month.
“NP-15” means the Existing Zone Generation Trading Hub for Existing Zone region NP15 as set forth in the CAISO Tariff.
822
15 “Operating Procedures” has the meaning set forth in the CAISO Tariff. “Operating Restrictions” means those restrictions, rules, requirements, and procedures set forth in Exhibit Q.
“Outage Schedule” has the meaning set forth in Section 4.12(a)(i). “Partial Deliverability Amount” has the meaning set forth in Section 3.3(d)(iii). “Party” has the meaning set forth in the Preamble.
“Performance Security” means (i) cash or (ii) a Letter of Credit or (iii) a Guaranty in the amount set forth on the Cover Sheet.
“Permitted Transferee” means (i) any Affiliate of Seller or (ii) any entity that satisfies, or is controlled by another Person that satisfies, the following requirements:
(a) A tangible net worth or assets under management of not less than or a Credit Rating of at least
s; and
(b) At least two (2) years of experience in the ownership and operations of energy generation or storage facilities similar to the Facility or has retained a third-party with such experience to operate the Facility.
“Person” means any individual, sole proprietorship, corporation, limited liability company, limited or general partnership, joint venture, association, joint-stock company, trust, incorporated organization, institution, public benefit corporation, unincorporated organization, government entity or other entity.
“Planned Outage” means a period during which the Facility is either in whole or in part not capable of providing service due to planned maintenance that has been scheduled in advance in accordance with Section 4.12(a).
“PMAX” means the applicable CAISO-certified maximum operating level of the Facility. “PMIN” means the applicable CAISO-certified minimum operating level of the Facility. “PNode” has the meaning set forth in the CAISO Tariff.
“Portfolio” means the portfolio of electrical energy generating, electrical energy storage, or other assets and entities, including the Facility (or the interests of Seller or Seller’s Affiliates or the interests of their respective direct or indirect parent companies), that is pledged as collateral security in connection with a Portfolio Financing.
“Portfolio Financing” means any debt incurred by an Affiliate of Seller that is secured only by a Portfolio.
823
16 “Portfolio Financing Entity” means any Affiliate of Seller that incurs debt in connection with any Portfolio Financing.
“Pre-Deliverability Period” has the meaning set forth in Section 2.2(b). “Product” has the meaning set forth on the Cover Sheet. “Progress Report” means a progress report including the items set forth in Exhibit E. “Prudent Operating Practice” means (a) the applicable practices, methods and acts required by or consistent with applicable Laws and reliability criteria, and otherwise engaged in or approved by a significant portion of the electric industry during the relevant time period with respect to grid-interconnected, utility-scale energy storage facilities in the Western United States, and (b) any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Prudent Operating Practice is not intended to be limited to the optimum practice, method or act to the exclusion of all others, but rather to acceptable practices, methods or acts generally accepted in the industry with respect to grid-interconnected, utility-scale energy storage facilities in the Western United States. Prudent Operating Practice shall include compliance with applicable Laws, applicable safety and reliability criteria, and the applicable criteria, rules and standards promulgated in the National Electric Safety Code and the National Electrical Code, as they may be amended or superseded from time to time, including the criteria, rules and standards of any successor organizations.
“Qualifying Capacity” has the meaning set forth in the CAISO Tariff. “RA Compliance Showing” means the (a) System RAR compliance or advisory showings (or similar or successor showings) and (b) Flexible RAR compliance or advisory showings (or similar successor showings), in each case, an entity is required to make to the CAISO pursuant to the CAISO Tariff, to the CPUC (and, to the extent authorized by the CPUC, to the CAISO) pursuant to the Resource Adequacy Rulings, or to any Governmental Authority. “RA Deficiency Amount” means the liquidated damages payment that Seller shall pay to Buyer for an applicable RA Shortfall Month, as calculated in accordance with Section 3.5(b). “RA Guarantee Date” means

“RA Penalties” means the RA penalties assessed against load serving entities by the CPUC for RA deficiencies that are not replaced or cured, as established by the CPUC in the Resource Adequacy Rulings and subsequently incorporated into the annual Filing Guide for System, Local and Flexible Resource Adequacy Compliance Filings that is issued by the CPUC Energy Division, or any replacement or successor documentation established by the CPUC Energy Division to reflect RA penalties that are established by the CPUC and assessed against load serving entities for RA deficiencies; provided, that RA Penalties shall not include any CPUC penalty multipliers resulting from Buyer’s prior or aggregate RA deficiencies. 824
17 “RA Shortfall Amount” shall be determined by calculating the difference of the Guaranteed RA Amount minus the Delivered RA in the applicable Showing Month; provided, if the CPUC adopts another methodology for calculating a load serving entity’s procurement deficiencies in Resource Adequacy Benefits for purposes of the Resource Adequacy Requirements, the Parties shall cooperate in good faith to amend this definition to conform to such new methodology in order to preserve to the maximum extent possible the benefits, burdens, and obligations set forth in this definition as of the Effective Date. If the result of the calculation is a negative number, the RA Shortfall Amount shall be deemed to be zero MW for such Showing Month.
“RA Shortfall Month” means any Showing Month during the Delivery Term, commencing with the Showing Month that contains the RA Guarantee Date, during which there is an RA Shortfall Amount;
“Real-Time Market” has the meaning set forth in the CAISO Tariff. “Receiving Party” has the meaning set forth in Section 18.2. “Reliability Network Upgrades” has the meaning set forth in the CAISO Tariff. “Remedial Action Plan” has the meaning set forth in Section 2.4. “Replacement RA” means Resource Adequacy Benefits from a Resource Adequacy Resource (as defined in the CAISO Tariff), if any, (a) equivalent in all respects to those that would have been provided by the Facility under the RA resource counting rules established by the CPUC, CAISO or other Governmental Body with jurisdiction with respect to the applicable Showing Month in which a RA Deficiency Amount is due to Buyer, including, as applicable, the same Slice-of-Day (as defined in the Resource Adequacy Rulings), generation profile and related characteristics, and any successor criteria applicable to the Facility, and any Local RAR, unless Buyer consents, such consent not to be unreasonably withheld, conditioned or delayed, to accept Replacement RA from another facility that provides non-equivalent Resource Adequacy Benefits, and (b) located within the CAISO Balancing Authority Area.

“Requested Confidential Information” has the meaning set forth in Section 18.2. “Resource Adequacy Benefits” means the rights and privileges attached to the Facility that satisfy any entity’s Resource Adequacy Requirements, as those obligations are set forth in any applicable decision or final guidance document issued by a Governmental Authority, including the 825
18 Resource Adequacy Rulings, or the CAISO Tariff, and shall include Flexible Capacity, and any local, zonal or otherwise locational attributes associated with the Facility. “Resource Adequacy Capacity” or “RA Capacity” has the meaning set forth in the CAISO Tariff.
“Resource Adequacy Requirements” or “RAR” means the resource adequacy requirements applicable to an entity as established by the CAISO pursuant to the CAISO Tariff, by the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority.
“Resource Adequacy Resource” has the meaning set forth in the CAISO Tariff. “Resource Adequacy Rulings” means CPUC Decisions 04-01-050, 04-10-035, 05-10-042, 06-04-040, 06-06-064, 06-07-031, 07-06-029, 08-06-031, 09-06-028, 10-06-036, 11-06-022, 12-06-025, 13-06-024, 14-06-050, 15-06-063, 16-06-045, 17-06-027, 18-06-030, 18- 06-031, 19-02-022, 19-06-026, 19-10-021, 20-01-004, 20-03-016, 20-06-002, 20-06-031, 20-06- 028, 20-12-006 and any other existing or subsequent ruling or decision, or any other resource adequacy laws, rules or regulations enacted, adopted or promulgated by the CPUC or the CAISO, however described, as such decisions, rulings, Laws, rules or regulations may be amended or modified from time-to-time throughout the Contract Term. “S&P” means the Standard & Poor’s Financial Services, LLC (a subsidiary of S&P Global Inc.) or its successor.
“SCADA Systems” means the standard supervisory control and data acquisition systems to be installed by Seller as part of the Facility, including those system components that enable Seller to receive ADS and AGC instructions from the CAISO or similar instructions from the Facility SC.
“Schedule” has the meaning set forth in the CAISO Tariff, and “Scheduled” and “Scheduling” have a corollary meaning.
“Scheduled Energy” means the Charging Energy schedule or Discharging Energy schedule, as applicable, that clears under the applicable CAISO market based on the final Day-Ahead Schedule, FMM Schedule (as defined in the CAISO Tariff), and/or any other financially binding Schedule, market instruction or CAISO dispatch for the Facility for a given period of time implemented in accordance with the CAISO Tariff.
“Scheduling Coordinator” or “SC” means an entity certified by the CAISO as qualifying as a Scheduling Coordinator pursuant to the CAISO Tariff for the purposes of undertaking the functions specified in “Responsibilities of a Scheduling Coordinator,” of the CAISO Tariff, as amended from time to time.
“Scheduling Coordinator Services” has the meaning in Exhibit D. “Security Interest” has the meaning set forth in Section 8.9. 826
19 “Seller” has the meaning set forth on the Cover Sheet. “Seller Dispatch” has the meaning set forth in Section 4.9(k). “Seller’s Dispatch Rights” has the meaning set forth in Section 4.9(k). “Seller’s Indemnified Parties” has the meaning set forth in Section 16.1(b). “Seller Initiated Test” has the meaning set forth in Section 4.4(c). “Settlement Amount” means the Non-Defaulting Party’s Costs and Losses, on the one hand, netted against its Gains, on the other. If the Non-Defaulting Party’s Costs and Losses exceed its Gains, then the Settlement Amount shall be an amount owing to the Non-Defaulting Party. If the Non-Defaulting Party’s Gains exceed its Costs and Losses, then the Settlement Amount shall be zero dollars ($0). The Settlement Amount does not include consequential, incidental, punitive, exemplary or indirect or business interruption damages. “Settlement Interval” has the meaning set forth in the CAISO Tariff. “Settlement Period” has the meaning set forth in the CAISO Tariff. “Shared Facilities” means the gen-tie lines, transformers, substations, or other equipment, permits, contract rights, and other assets and property (real or personal), in each case, as necessary to enable delivery of Charging Energy and Discharging Energy to and from the Delivery Point to the Facility (which is excluded from Shared Facilities) that are used in common with third parties or by Seller for electric generation or storage facilities owned by Seller or its Affiliates other than the Facility.
“Showing Month” shall be a calendar month of the Delivery Term, commencing with the Showing Month that contains the RA Guarantee Date, that is the subject of a RA Compliance Showing, as set forth in the Resource Adequacy Rulings and outlined in the CAISO Tariff. For illustrative purposes only, pursuant to the CAISO Tariff and Resource Adequacy Rulings in effect as of the Effective Date, the monthly RA Compliance Showing made in June is for the Showing Month of August.
“Site” means the real property on which the Facility is or will be located, as further described in Exhibit A, and as shall be updated by Seller at the time Seller provides an executed Construction Start Date certificate in the form of Exhibit J to Buyer; provided, that any such update to the Site that includes real property that was not originally contained within the Site boundaries described in Exhibit A shall be subject to Buyer’s approval of such updates in its sole discretion. “Site Control” means that, for the Contract Term, Seller (or, prior to the Delivery Term, Seller or its Affiliate): (a) owns or has the option to purchase the Site; (b) is the lessee or has the option to lease the Site; or (c) is the holder of an easement or an option for an easement, right-of-way grant, or similar instrument with respect to the Site. “State of Charge” or “SOC” means the ratio of (a) the Stored Energy Level of the Facility to (b) the Effective Capacity multiplied by four (4) hours, expressed as a percentage. 827
20 “Station Use” has the meaning defined by the retail energy provider or the distribution service provider’s tariff.
“Stored Energy Level” means, at a particular time, the amount of electric Energy in the Facility available to be discharged to the Delivery Point as Discharging Energy, expressed in MWh.
“Subsequent Purchaser” means the purchaser or recipient of Product from Buyer in any conveyance, re-sale or remarketing of Product by Buyer. “Supplementary Capacity Test Protocol” has the meaning set forth in Exhibit O. “Supply Plan” has the meaning set forth in the CAISO Tariff. “System Emergency” means any condition that requires, as determined and declared by CAISO or the Transmission Provider, automatic or immediate action to (i) prevent or limit harm to or loss of life or property, (ii) prevent loss of transmission facilities or generation supply in the immediate vicinity of the Facility, or (iii) to preserve Transmission System reliability. “System RAR” means the Resource Adequacy Requirements established for load-serving entities by the CAISO pursuant to the CAISO Tariff, the CPUC pursuant to the Resource Adequacy Rulings, or by any other Governmental Authority, but excluding local and Flexible RAR. “System RAR” may also be known as system area reliability, system resource adequacy, system resource adequacy procurement requirements, or system capacity requirement in other regulatory proceedings or legislative actions.
“Tax” or “Taxes” means all U.S. federal, state and local and any foreign taxes, levies, assessments, surcharges, duties and other fees and charges of any nature imposed by a Governmental Authority, whether currently in effect or adopted during the Contract Term, including ad valorem, excise, franchise, gross receipts, import/export, license, property, sales and use, stamp, transfer, payroll, unemployment, income, and any and all items of withholding, deficiency, penalty, additions, interest or assessment related thereto. “Tax Credits” means any (i) federal production tax credit, depreciation benefit, tax deduction and/or investment tax credit, including the ITC, specific to investments in renewable energy facilities and/or energy storage facilities and (ii) any refundable credit, grant, or other cash payment in lieu of an incentive described in clause (i). “Terminated Transaction” has the meaning set forth in Section 11.2(a). “Termination Payment” has the meaning set forth in Section 11.3(b). “Throughput” means, for a day or Contract Year (as the context dictates), the cumulative amount of Discharging Energy from the Facility for such time period. “Transmission Provider” means any entity that owns, operates and maintains transmission or distribution lines and associated facilities and/or has entitlements to use certain 828
21 transmission or distribution lines and associated facilities for the purpose of transmitting or transporting the Discharging Energy from the Delivery Point. “Transmission System” means the transmission facilities operated by the CAISO, now or hereafter in existence, which provide energy transmission service downstream from the Delivery Point.
“Transmission System Outage” means an outage on the Transmission System, other than a System Emergency, that is not caused by Seller’s actions or inactions and that prevents (i) Buyer or the CAISO (as applicable) from receiving Discharging Energy onto the Transmission System or (ii) Seller from receiving Charging Energy at the Delivery Point or delivering Discharging Energy to the Delivery Point.
“Unplanned Outage” means a period during which the Facility is not capable of providing service due to the need to maintain or repair a component thereof, which period is not a Planned Outage.

1.2 Rules of Interpretation. In this Agreement, except as expressly stated otherwise or unless the context otherwise requires:
(a) headings and the rendering of text in bold and italics are for convenience and reference purposes only and do not affect the meaning or interpretation of this Agreement; (b) words importing the singular include the plural and vice versa and the masculine, feminine and neuter genders include all genders; (c) the words “hereof”, “herein”, and “hereunder” and words of similar import shall refer to this Agreement as a whole and not to any particular provision of this Agreement; (d) a reference to an Article, Section, paragraph, clause, Party, or Exhibit is a reference to that Article, Section, paragraph, clause of, or that Party or Exhibit to, this Agreement unless otherwise specified;
(e) a reference to a document or agreement, including this Agreement shall mean such document, agreement or this Agreement including any amendment or supplement to, or replacement, novation or modification of this Agreement, but disregarding any amendment, supplement, replacement, novation or modification made in breach of such document, agreement or this Agreement;
(f) a reference to a Person includes that Person’s successors and permitted assigns;
(g) the terms “include” and “including” mean “include or including (as applicable) without limitation” and any list of examples following such term shall in no way restrict or limit the generality of the word or provision in respect of which such examples are provided;
829
22 (h) references to any statute, code or statutory provision are to be construed as a reference to the same as it may have been, or may from time to time be, amended, modified or reenacted, and include references to all bylaws, instruments, orders and regulations for the time being made thereunder or deriving validity therefrom unless the context otherwise requires; (i) in the event of a conflict, a mathematical formula or other precise description of a concept or a term shall prevail over words providing a more general description of a concept or a term;
(j) references to any amount of money shall mean a reference to the amount in United States Dollars;
(k) the expression “and/or” when used as a conjunction shall connote “any or all of”;
(l) words, phrases or expressions not otherwise defined herein that (i) have a generally accepted meaning in Prudent Operating Practice shall have such meaning in this Agreement or (ii) do not have well known and generally accepted meaning in Prudent Operating Practice but that have well known and generally accepted technical or trade meanings, shall have such recognized meanings; and
(m) each Party acknowledges that it was represented by counsel in connection with this Agreement and that it or its counsel reviewed this Agreement and that any rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this Agreement.

ARTICLE 2
TERM; CONDITIONS PRECEDENT

2.1 Contract Term.
(a) The term of this Agreement shall commence on the Effective Date and shall remain in full force and effect until the conclusion of the Delivery Term, subject to any early termination provisions and any contract term extension provisions set forth herein (“Contract Term”); provided, Buyer’s obligations to pay for or accept any Product are subject to Seller’s completion of the conditions precedent pursuant to Section 2.3. (b) Delivery Term Extension. Provided that Seller reasonably believes that the Facility can perform its obligations under this Agreement for an additional five (5) years after the Contract Term, Buyer may, in its sole discretion, elect to extend the Contract Term for an additional five (5) year period (“Extension Term”). Within ninety (90) days prior to the conclusion of the Delivery Term, Buyer shall provide Seller written notice of Buyer’s decision on whether to extend the Delivery Term. The Parties shall cooperate in good faith to make only those changes to this Agreement that are necessary to reflect the extension of the Delivery Term.

All other terms and conditions of this Agreement, including Contract Price, shall remain in effect during the Extension Term.
830
23 (c) Survival. Applicable provisions of this Agreement shall continue in effect after termination, including early termination, to the extent necessary to enforce or complete the duties, obligations or responsibilities of the Parties arising prior to termination. The confidentiality obligations of the Parties under Article 18 shall remain in full force and effect for two (2) years following the termination of this Agreement, and all audit rights shall remain in full force and effect for three (3) years following the termination of this Agreement.

2.3 Commercial Operation; Conditions Precedent. Seller shall provide Notice to Buyer of the expected Commercial Operation Date at least sixty (60) days in advance of such date.

Seller shall provide Notice to Buyer when Seller believes it has provided the required documentation to Buyer and met all the conditions precedent set forth below for achieving Commercial Operation. Following Buyer’s receipt of such Notice, Buyer shall have five (5) Business Days to approve or reject Seller’s request for confirmation of Commercial Operation, which, if confirmed, shall be deemed to have occurred as of the date of such Notice. If Buyer fails to respond to Seller’s Notice within such five (5) Business Day period, Buyer will be deemed to have approved Seller’s request for confirmation of Commercial Operation. Upon Buyer’s approval (or deemed approval) of Seller’s achievement of Commercial Operation, Buyer shall provide Seller with written acknowledgement of the Commercial Operation Date. (a) Seller has delivered to Buyer (i) a completion certificate from a Licensed Professional Engineer substantially in the form of Exhibit H and (ii) a certificate from a Licensed Professional Engineer substantially in the form of Exhibit I setting forth the Installed Capacity and Efficiency Rate on the Commercial Operation Date;
(b) Seller has executed an Interconnection Agreement with the Transmission Provider, which shall be in full force and effect and a copy of the Interconnection Agreement delivered to Buyer;
(c) Seller has provided Buyer with (i) a copy of written notice (or other evidence reasonably acceptable to Buyer) from CAISO that the Facility has achieved Interim Deliverability Status or Full Capacity Deliverability Status in the amount of the Guaranteed Capacity; or (ii) notice that the Facility will be operated as an Energy Tolling Resource pursuant to Section 2.2;
831
24 (d) A Participating Generator Agreement and a Meter Service Agreement between Seller and CAISO shall have been executed and delivered and be in full force and effect, and a copy of each such agreement delivered to Buyer;
(e) Seller has obtained CAISO Certification for the Facility; (f) The Facility has successfully completed all testing required by Prudent Operating Practice or any requirement of Law to commence operations of the Facility; (g) All applicable regulatory authorizations, approvals and permits for the commencement of operation of the Facility have been obtained and all conditions thereof that are capable of being satisfied on the Commercial Operation Date have been satisfied and shall be in full force and effect;
(h) Seller has Site Control;
(i) Seller has delivered the Performance Security to Buyer in accordance with Section 8.8;
(j) Insurance requirements for the Facility have been met, with evidence provided in writing to Buyer, in accordance with Section 17.1; and (f) Seller has paid Buyer for all amounts owing under this Agreement as of the Commercial Operation Date, if any, including Daily Delay Damages and Commercial Operation Delay Damages.

2.4 Development; Construction; Progress Reports. Within fifteen (15) days after the close of (i) each calendar quarter from the first calendar quarter following the Effective Date until the Construction Start Date, and (ii) each calendar month from the first calendar month following the Construction Start Date until the Commercial Operation Date, Seller shall provide to Buyer a Progress Report and shall be available to hold regularly scheduled meetings between representatives of Buyer and Seller to review such monthly reports and discuss Seller’s construction progress. The form of the Progress Report is set forth in Exhibit E. Seller shall also provide Buyer with any reasonably requested documentation (subject to confidentiality restrictions) directly related to the achievement of Milestones within ten (10) Business Days of receipt of such request by Seller. Seller is solely responsible for the design and construction of the Facility, including the location of the Site, the Facility layout, and the selection and procurement of the equipment comprising the Facility.

2.5 Remedial Action Plan. If Seller misses a Milestone by more than sixty (60) days, except as the result of Force Majeure Event, Buyer Default, or any failure of the Facility’s SC if the Facility SC is the Scheduling Coordinator for the Facility, Seller shall submit to Buyer, within ten (10) Business Days of the end of such sixty (60)-day period following such missed Milestone completion date, a remedial action plan (“Remedial Action Plan”), which will describe in detail any delays (actual or anticipated) beyond the scheduled Milestone dates, including the cause of the delay, if known (e.g., governmental approvals, financing, property acquisition, design activities, equipment procurement, project construction, interconnection, or any other factor), Seller’s detailed description of its proposed course of action to achieve the missed Milestones and all 832
25 subsequent Milestones by the Guaranteed Commercial Operation Date; provided, delivery of any Remedial Action Plan shall not relieve Seller of its obligation to provide Remedial Action Plans with respect to any subsequent Milestones and to achieve the Guaranteed Commercial Operation Date in accordance with the terms of this Agreement. Subject to the provisions of Exhibit B, so long as Seller complies with its obligations under this Section 2.4, Seller shall not be considered in default of its obligations under this Agreement solely as a result of missing any Milestone.

2.6 Pre-Commercial Operation Actions. The Parties agree that, in order for Buyer to dispatch the Facility for its Commercial Operation Date, the Parties will have to perform certain of their Delivery Term obligations in advance of the Commercial Operation Date, including, without limitation, Seller’s delivery of an Availability Notice for the Commercial Operation Date, and Buyer’s delivery of a Dispatch Notice and nominating and scheduling the Facility for the Commercial Operation Date, in advance of the Commercial Operation Date. The Parties shall cooperate with each other in order for Buyer to be able to dispatch the Facility for the Commercial Operation Date.

ARTICLE 3

PURCHASE AND SALE

3.1 Product. Subject to the terms and conditions of this Agreement, during the Delivery Term, Buyer shall have the exclusive right to the Effective Capacity and all Product associated therewith. Seller shall operate the Facility and make available, charge and discharge, deliver, and sell the Product therefrom to Buyer when and as the Facility is available, subject to the terms and conditions of this Agreement, including the Operating Restrictions. Seller represents and warrants that it will deliver the Product to Buyer free and clear of all liens, security interests, claims and encumbrances. Seller shall not substitute or purchase any energy storage capacity, Energy, Ancillary Services or Capacity Attributes from any other energy storage resource or the market for delivery hereunder except as otherwise provided herein, nor shall Seller sell, assign or otherwise transfer any Product, or any portion thereof, to any third party other than to Buyer or the CAISO pursuant to this Agreement or as otherwise required by Law.

3.2 Discharging Energy. Subject to the terms and conditions of this Agreement, Seller commits to make available the Discharging Energy to Buyer during the Delivery Term, and Buyer shall have the exclusive rights to all such Discharging Energy, subject to the Operating Restrictions and Seller’s Dispatch Rights (if applicable). Title to and risk of loss related to Buyer Discharging Energy shall pass and transfer from Seller to Buyer at the Delivery Point.

3.3 Capacity Attributes. Seller shall request Full Capacity Deliverability Status for the Facility’s Guaranteed Capacity in the CAISO generator interconnection process. As between Buyer and Seller, Seller shall be responsible for the cost and installation of any Network Upgrades associated with obtaining such Full Capacity Deliverability Status. (a) Throughout the Delivery Term, Seller grants, pledges, assigns and otherwise commits to Buyer all available Capacity Attributes from the Facility. (b) Throughout the Delivery Term and subject to Sections 2.2, 3.3(d) and 3.7, Seller shall maintain Interim Deliverability Status or Full Capacity Deliverability Status for the 833
26 Facility from the CAISO and shall perform all commercially reasonable actions necessary to ensure that the Facility qualifies to provide Resource Adequacy Benefits, including Flexible Capacity, to Buyer. Throughout the Delivery Term and subject to Section 3.7, Seller hereby covenants and agrees to use commercially reasonable efforts to transfer all available Resource Adequacy Benefits from the Facility to Buyer.
(c) For the duration of the Delivery Term, and subject to Section 3.7, Seller shall take all commercially reasonable actions, including complying with all applicable registration and reporting requirements, and execute all documents or instruments necessary to enable Buyer to use all of the Capacity Attributes committed by Seller to Buyer pursuant to this Agreement. (d) The Parties acknowledge and agree that Seller will need to obtain Interim Deliverability Status from the CAISO on a yearly basis until such time as certain network upgrades (which may include certain transmission plan upgrades) are completed that will allow the Facility to achieve Full Capacity Deliverability Status (such time period, the “Interim Deliverability Period”). Beginning in the year prior to the first year of expected Commercial Operation and continuing throughout the Interim Deliverability Period, Seller shall provide Buyer with Notice no later than August 1 of each year as to whether it has obtained Interim Deliverability for all or any portion of the Guaranteed Capacity for the following calendar year (“Interim Deliverability Notice”); provided however, if CAISO has not provided notice to Seller by August 1, Seller shall provide the Interim Deliverability Notice to Buyer within two (2) Business Days of receipt of notice from CAISO of the deliverability status of the Facility. (i) If Seller confirms in an Interim Deliverability Notice that the CAISO has granted Interim Deliverability Status to the Facility in the amount of the Guaranteed Capacity for the following calendar year, then the Contract Price for such year shall be as set forth on the Cover Sheet.
(ii) If Seller confirms in an Interim Deliverability Notice that the CAISO has not granted Interim Deliverability Status to the Facility in the amount of the Guaranteed Capacity for the following calendar year, Seller shall have the right to provide Replacement RA in the amount of any shortfall and up to but not exceeding the Guaranteed Capacity for each of the Showing Months in such year and, if such Replacement RA is fully provided, the Contract Price for such following year shall be as set forth on the Cover Sheet. Seller shall provide Notice to Buyer by no later than August 1 of each year during the Interim Deliverability Period of the amount of Replacement RA to be provided by Seller for each Showing Month of the following calendar year. Seller may offer Replacement RA to Buyer after August 1 for the following calendar year; provided however, acceptance of such offer shall be at Buyer’s sole discretion.
(iii) If Seller confirms in an Interim Deliverability Notice that the CAISO has not granted Interim Deliverability Status to the Facility in the full amount of the Guaranteed Capacity for the following calendar year and Seller does not fully provide Replacement RA for such year, then the Facility will be designated as an Energy Tolling Resource for such year. During any calendar year in which the Facility is an Energy Tolling Resource, (A) Buyer will only show the Facility in its yearly or any monthly Supply Plan showings in an amount equal to the number of MW of Facility NQC (inclusive of the quantity of Replacement RA 834
27 provided, if any) that Seller is able to provide to Buyer for the applicable monthly Supply Plan, if any (the “Partial Deliverability Amount”);
(C) the Parties shall agree upon
any technical or operational changes necessary to allow Buyer to operate the Facility as an Energy Tolling Resource for such year; and (D) Seller shall not be deemed to be in default or otherwise in violation of this Agreement solely as the result of the CAISO not granting Interim Deliverability Status to the Facility in the amount of the Guaranteed Capacity for such year. (iv) Notwithstanding Sections 3.3(d)(ii) and (iii), if CAISO has not granted Interim Deliverability Status to the Facility for 2029, commencing on January 1, 2029 to the first Showing Month that Buyer can show the Facility on its monthly supply plan, Seller shall provide Replacement RA to Buyer in the amount of the Guaranteed Capacity from the Replacement RA Unit which Replacement RA shall equal the full NQC of the Replacement RA Unit and be included in the calculation of Delivered RA in an amount equal to the Guaranteed Capacity. If Seller provides such Replacement RA to Buyer in the amount of the Guaranteed Capacity from the Replacement RA Unit, the Contract Price shall be as set forth on the Cover Sheet. For the avoidance of doubt, the Replacement RA Unit’s Replacement RA shall be deemed to be equal to the NQC MW’s that the Facility would have qualified for if the Facility was granted Full Capacity Deliverability Status or Interim Deliverability Status. Shortfalls in Replacement RA from the Replacement RA Unit shall be included in the calculation of RA Shortfall Amount for the applicable month and Section 3.5 shall apply to such shortfalls.

3.4 Ancillary Services.
(a) Ancillary Services. Buyer shall have the exclusive rights to all Ancillary Services that the Facility is capable of providing during the Delivery Term consistent with the Operating Restrictions, with characteristics and quantities determined in accordance with the CAISO Tariff. Seller shall operate and maintain the Facility throughout the Delivery Term so as to be able to provide Ancillary Services in accordance with the specifications set forth in the Facility’s initial CAISO Certification associated with the Effective Capacity. Upon Buyer’s reasonable request, Seller shall submit the Facility for additional CAISO Certification so that the Facility may provide additional Ancillary Services that the Facility is, at the relevant time, actually physically capable of providing consistent with the definition of Ancillary Services herein and without modification of the Facility, provided that Buyer has agreed to reimburse Seller for any material costs Seller incurs in connection with conducting such additional CAISO Certification.

3.5 Resource Adequacy Failure.
835
28 3.6 Buyer’s Re-Sale of Product. Buyer shall have the exclusive right in its sole discretion to convey, use, market, or sell the Product, or any part of the Product, to any Subsequent Purchaser; and Buyer shall have the right to all revenues generated from the conveyance, use, re-sale or remarketing of the Product, or any part of the Product. If the CAISO or CPUC develops a centralized capacity market, Buyer shall have the exclusive right to offer, bid, or otherwise submit the Capacity Attributes for re-sale into such market, and Buyer shall retain and receive all revenues from such re-sale. Seller shall take all commercially reasonable actions and execute all documents or instruments reasonably necessary to allow Subsequent Purchasers to use such resold Product, but without increasing Seller’s obligations or liabilities under this Agreement. If Buyer incurs any liability to a Subsequent Purchaser due to the failure of Seller to comply with this Section 3.6, Seller shall be liable to Buyer for the amounts Seller would have owed Buyer under this Agreement if Buyer had not resold the Product.

3.7 Compliance Expenditure Cap. If a change in Laws occurring after the Effective Date has increased Seller’s cost to comply with Seller’s obligations under this Agreement with respect to obtaining, maintaining, conveying or effectuating Buyer’s use of Capacity Attributes, then the Parties agree that the maximum aggregate amount of costs and expenses Seller shall be required to bear during the Contract Term to comply with all of such obligations shall be capped at of Guaranteed Capacity (“Compliance
Expenditure Cap”).
(a) Any actions required for Seller to comply with its obligations set forth in the first paragraph above, the cost of which will be included in the Compliance Expenditure Cap, shall be referred to collectively as the “Compliance Actions.” For clarity, Compliance Actions shall not require Seller to install any additional MW or MWh of energy storage capacity, or otherwise alter the physical design or configuration of the Facility in any material manner. (b) If Seller reasonably anticipates the need to incur out-of-pocket expenses in excess of the Compliance Expenditure Cap in order to take any Compliance Action Seller shall provide Notice to Buyer of such anticipated out-of-pocket expenses. (c) Buyer will have sixty (60) days to evaluate such Notice (during which time period Seller is not obligated to take any Compliance Actions described in the Notice) and shall, within such time, either (1) agree to reimburse Seller for all or some portion of the costs that exceed the Compliance Expenditure Cap (such Buyer-agreed upon costs, the “Accepted Compliance 836
29 Costs”), or (2) waive Seller’s obligation to take such Compliance Actions, or any part thereof for which Buyer has not agreed to reimburse Seller.
(d) If Buyer agrees to reimburse Seller for the Accepted Compliance Costs, then Seller shall take such Compliance Actions covered by the Accepted Compliance Costs as agreed upon by the Parties and Buyer shall reimburse Seller for Seller’s actual costs to effect the Compliance Actions, not to exceed the Accepted Compliance Costs, within sixty (60) days from the time that Buyer receives an invoice and documentation of such costs from Seller. (e) If (x) Buyer does not respond to a Notice given by Seller under this Section

3.7 within sixty (60) days after Buyer’s receipt of same, (y) Buyer does not pay, or refuses to pay, the compliance costs specified in the Notice that are in excess of the Compliance Expenditure Cap, or (z) it is not possible for Seller to achieve compliance with this Agreement or a change in Law through the payment or incurrence of costs, then in each case (i) Seller shall have no further obligation to take, and no liability for any failure to take, the Compliance Actions specified in the Notice for the remainder of the Contract Term and Seller shall not be deemed to be in breach or default hereunder, (ii) Seller shall not owe any damages that would have otherwise been due hereunder arising from or attributable to any failure to take such Compliance Actions specified in the Notice, and (iii) Buyer shall continue to pay Seller under this Agreement for the remainder of the Contract Term without any reduction in payments as if all such Compliance Actions were taken.

ARTICLE 4

OBLIGATIONS AND DELIVERIES

4.1 Delivery. Subject to the provisions of this Agreement, including Section 4.9(a), commencing on the Commercial Operation Date through the end of the Contract Term, Seller shall supply and deliver the Product to Buyer at the Delivery Point, and Buyer shall take delivery of the Product at the Delivery Point in accordance with the terms of this Agreement; provided, that the Parties acknowledge and agree that Capacity Attributes shall be deemed supplied and delivered by Seller once the Facility SC includes the Capacity Attributes on a Supply Plan or at Buyer’s direction does not include the Capacity Attributes or a portion thereof on a Supply Plan. Seller shall be responsible for paying or satisfying when due any costs or charges imposed in connection with the delivery of Discharging Energy to the Delivery Point, including any operation and maintenance charges imposed on Seller by the Transmission Provider directly relating to the Facility’s operations. Buyer shall be responsible for all costs, charges and penalties, if any, imposed in connection with the delivery of Buyer Charging Energy to the Delivery Point (including the cost of Buyer Charging Energy itself) and delivery of Buyer Discharging Energy at and after the Delivery Point, including without limitation transmission costs and transmission line losses and imbalance charges. The Buyer Charging Energy and Buyer Discharging Energy will be scheduled to the CAISO by Buyer in accordance with Exhibit D.

4.2 Interconnection. Seller shall be responsible for all costs of interconnecting the Facility to the Interconnection Point. During the Delivery Term, Seller shall have and maintain interconnection capacity available or allocable to the Facility that is no less than the Dedicated Interconnection Capacity throughout the Delivery Term.
837
30 4.3 Storage Availability and Efficiency.
(a) During the Delivery Term, the Facility shall maintain a Monthly Capacity Availability during each month of no less than the Guaranteed Availability, which Monthly Capacity Availability shall be calculated in accordance with Exhibit P. If the Monthly Capacity Availability during any month is less than the Guaranteed Availability, then Buyer’s Monthly Capacity Payment shall be calculated by reference to the Availability Adjustment (as determined in accordance with Exhibit C).
(b) During the Delivery Term, the Facility shall maintain an Efficiency Rate of no less than Guaranteed Efficiency Rate, which Efficiency Rate shall be calculated in accordance with a Capacity Test conducted pursuant to Exhibit O. If the Efficiency Rate during any month is less than the Guaranteed Efficiency Rate, Seller shall owe liquidated damages pursuant to Exhibit C.

4.4 Facility Testing.
(a) Capacity Tests. Prior to the Commercial Operation Date, Seller shall schedule and complete a Commercial Operation Capacity Test in accordance with Exhibit O.

Thereafter, Seller and Buyer shall have the right to run additional Capacity Tests in accordance with Exhibit O.
(i) Buyer shall have the right to send one or more representative(s) to witness all Capacity Tests. Alternatively, to the extent that any Capacity Tests are done remotely, and no representatives are needed on site, Seller shall arrange for both Parties to have access to all data and other information arising out of such tests.
(ii) Following each Capacity Test, Seller shall submit a testing report in accordance with Exhibit O. If the actual capacity or efficiency rate determined pursuant to a Capacity Test varies from the then-current Effective Capacity and/or Efficiency Rate, as applicable, then the actual capacity and/or efficiency rate determined pursuant to such Capacity Test shall become the new Effective Capacity and/or Efficiency Rate, as applicable, at the beginning of the day following the completion of the test for all purposes under this Agreement until a revised Effective Capacity and/or Efficiency Rate, as applicable, is determined pursuant to a subsequent Capacity Test.
(b) Additional Testing. Seller shall conduct such additional testing as necessary to ensure the Facility is functioning properly and the Facility is able to respond to Dispatch Notices pursuant to Section 4.6(b).
(c) Any testing of the Facility requested by Buyer after the Commercial Operation Capacity Tests, and all required annual tests pursuant to Section B of the section headed “Capacity Test Notice and Frequency” in Exhibit O, shall be deemed Buyer-instructed dispatches of the Facility (“Buyer Dispatched Test”). Any test of the Facility that is not a Buyer Dispatched Test, including all tests conducted prior to Commercial Operation, any Commercial Operation Capacity Test, any Capacity Test conducted if the Effective Capacity immediately prior to such Capacity Test is below seventy percent (70%) of the Installed Capacity, any test required by CAISO (including any test required to obtain or maintain CAISO Certification), and other Seller-838 31 requested discretionary tests or dispatches, at times and for durations reasonably agreed to by Buyer, that Seller deems necessary for purposes of reliably operating or maintaining the Facility or for re-performing a required test within a reasonable number of days of the initial required test (considering the circumstances that led to the need for a retest) shall be deemed a “Seller Initiated Test”.
(i) For any Seller Initiated Test other than a Capacity Test required by Exhibit O for which there is a stated notice requirement, Seller shall notify Buyer no later than twenty-four (24) hours prior thereto (or any shorter period reasonably acceptable to Buyer consistent with Prudent Operating Practices).
(ii) No Dispatch Notices shall be issued during any Seller Initiated Test.

Dispatch Notices may be issued during a Buyer Dispatched Test as reasonably necessary to implement the applicable test. The Facility shall be deemed unavailable during any Seller Initiated Test. Any Buyer Dispatched Test shall be deemed an Excused Event for the purposes of calculating the Monthly Capacity Availability.

4.5 Testing Costs and Revenues.
(a) Buyer shall be responsible for paying for all Charging Energy and shall be entitled to all CAISO revenues associated with a Buyer Dispatched Test. Seller shall be responsible for paying for all Energy to charge the Facility and shall be entitled to all CAISO revenues associated with a Seller Initiated Test. Buyer shall pay to Seller, in the month following Buyer’s receipt of such CAISO revenues and otherwise in accordance with Exhibit C, all applicable CAISO revenues received by Buyer and associated with the discharge Energy associated with such Seller Initiated Test.
(b) Buyer shall be responsible for all costs, expenses and fees payable or reimbursable to its representative(s) witnessing any Facility test. (c) Except as set forth in Sections 4.5(a) and (b), all other costs of any testing of the Facility shall be borne by Seller.

4.6 Facility Operations.
(a) Seller shall operate the Facility in accordance with Prudent Operating Practices.
(b) During the Delivery Term, Seller shall maintain SCADA Systems, communications links, and other equipment necessary to receive automated Dispatch Notices consistent with CAISO protocols and practice (“Automated Dispatches”). In the event of the failure or inability of the Facility to receive Automated Dispatches, Seller shall use all commercially reasonable efforts to repair or replace the applicable components as soon as reasonably possible, and if there is any material delay in such repair or replacement, Seller shall provide Buyer with a written plan of all actions Seller plans to take to repair or replace such components for Buyer’s review and comment. During any period during which the Facility is not capable of receiving or implementing Automated Dispatches, Seller shall implement back-up 839
32 procedures consistent with the CAISO Tariff and CAISO protocols to enable Seller to receive and implement non-automated Dispatch Notices (“Alternative Dispatches”). (c) Seller shall maintain a daily operations log for the Facility which shall include but not be limited to information on Energy charging and discharging, electricity consumption and efficiency (if applicable), availability, outages, changes in operating status, inspections and any other significant events related to the operation of the Facility. Information maintained pursuant to this Section 4.6(c) shall be provided to Buyer within fifteen (15) days of Buyer’s request.
(d) Seller shall maintain accurate records with respect to all Capacity Tests. (e) Seller shall maintain and make available to Buyer upon request records, including logbooks, demonstrating that the Facility is operated in accordance with Prudent Operating Practices. Seller shall comply with all reporting requirements and upon request permit on-site audits, investigations, tests and inspections permitted or required under any Prudent Operating Practices.

4.7 Dispatch Notices. Buyer shall have the right to dispatch the Facility seven (7) days per week and twenty-four (24) hours per day (including holidays), by providing Dispatch Notices, subject to availability of the Facility and the requirements and limitations set forth in this Agreement, including the Operating Restrictions. Subject to the Operating Restrictions, each Dispatch Notice shall be effective unless and until such Dispatch Notice is modified by the CAISO, Buyer or the Facility SC. If Automated Dispatches are not possible for reasons beyond Buyer’s control, Alternative Dispatches may be provided pursuant to Section 4.6(b).

4.8 Facility Unavailability to Receive Dispatch Notices. To the extent the Facility is unable to receive or respond to Dispatch Notices either through Automated Dispatches or Alternative Dispatches during any Settlement Interval or Settlement Period, then as an exclusive remedy, the time period corresponding to such Settlement Interval or Settlement Period shall be deemed unavailable for purposes of calculating the Monthly Capacity Availability except to the extent that the Facility is unable to receive or respond to Dispatch Notices due to an Excused Event or any circumstances at the high-voltage side of the Delivery Point or beyond that point.

4.9 Energy Management.
(a) Charging Generally. Upon receipt of a valid Charging Notice, Seller shall take all commercially reasonable action necessary to deliver the Charging Energy to the Facility from the Delivery Point. Seller shall maintain, repair or replace equipment in Seller’s possession or control used to deliver the Charging Energy from the Delivery Point to the Facility. Except as otherwise expressly set forth in this Agreement, Buyer shall be responsible for paying all costs and charges of delivering the Buyer Charging Energy to the Delivery Point, including all CAISO costs and charges associated with Buyer Charging Energy.
(b) Charging Notices. Buyer shall have the right to direct Seller to charge the Facility seven (7) days per week and twenty-four (24) hours per day (including holidays) during the Delivery Term, by causing Charging Notices to be issued, subject to availability of the Facility and the requirements and limitations set forth in this Agreement, including the Operating 840
33 Restrictions. Each Charging Notice issued by Buyer in accordance with this Agreement shall be effective unless and until Buyer, Facility SC, or CAISO modifies such Charging Notice by providing Seller and the Facility SC with an updated Charging Notice. Buyer shall be responsible for issuing all Charging Notices necessary or required in connection with the Must Offer Obligations and all CAISO charges and penalties for failing to comply with the Must Offer Obligation.
(c) No Unauthorized Charging. Seller shall not charge the Facility during the Delivery Term other than (i) pursuant to a valid Charging Notice (it being understood that Seller may adjust a Charging Notice to the extent necessary to maintain compliance with the Operating Restrictions), (ii) in connection with a Seller Initiated Test (including Facility maintenance or a Capacity Test), (iii) pursuant to a notice from the Transmission Provider or Governmental Authority, or (iv) in connection with Seller’s Dispatch Rights (if applicable). If, during the Delivery Term, Seller charges the Facility (i) to a Stored Energy Level greater than the Stored Energy Level provided for in a Charging Notice (except as allowed by Seller’s Dispatch Rights, if applicable), or (ii) in violation of the first sentence of this Section 4.9(c), then (i) Seller shall pay to Buyer all Energy costs associated with such charging of the Facility, and (ii) Buyer shall be entitled to discharge such Energy and shall be entitled to all of the benefits (including Product) associated with such discharge. If, during the Delivery Term, and only if Seller is the Facility SC, Seller charges the Facility as allowed pursuant to Seller’s Dispatch Rights, then (x) Seller shall be responsible for all Energy costs associated with such charging of the Facility, and (y) Seller shall be entitled to discharge such Energy and shall be entitled to any and all revenues associated with such discharge.
(d) Discharging Notices. Buyer shall have the right to direct Seller to discharge the Facility seven (7) days per week and twenty-four (24) hours per day (including holidays) during the Delivery Term, by causing Discharging Notices to be issued, subject to availability of the Facility and the requirements and limitations set forth in this Agreement, including the Operating Restrictions. Each Discharging Notice issued in accordance with this Agreement shall be effective unless and until Buyer, the Facility SC or the CAISO modifies such Discharging Notice by providing the Seller and the Facility SC with an updated Discharging Notice. Buyer shall be responsible for issuing all Discharging Notices necessary or required in connection with the Must Offer Obligations and all CAISO charges and penalties for failing to comply with the Must Offer Obligation unless such CAISO charges and penalties arise from a Seller Dispatch (if applicable). (e) No Unauthorized Discharging. Seller shall not discharge the Facility during the Delivery Term other than (i) pursuant to a valid Discharging Notice (it being understood that Seller may adjust a Discharging Notice to the extent necessary to maintain compliance with the Operating Restrictions), (ii) in connection with a Seller Initiated Test (including Facility maintenance or a Storage Capacity Test), (iii) pursuant to a notice from the Transmission Provider or Governmental Authority, or (iv) as allowed pursuant to Seller’s Dispatch Rights (if applicable). (f) Unauthorized Charges and Discharges. If Seller or any third party charges, discharges or otherwise uses the Facility other than as permitted hereunder, or as is expressly addressed in this Section 4.9, it shall be a breach by Seller and Seller shall hold Buyer harmless from, and indemnify Buyer against, all actual costs or losses associated therewith, and be responsible to Buyer for any damages arising therefrom, and, if Seller fails to implement 841
34 procedures reasonably acceptable to Buyer to prevent any further occurrences of the same, then the failure to implement such procedures shall be an Event of Default under Article 11. Seller shall have no obligation to comply with and shall have no liability arising out of any failure or refusal to comply with any Notice, instrument, order, Charging Notice or Discharging Notice that is inconsistent with the Operating Restrictions.
(g) CAISO Dispatches. During the Delivery Term, CAISO Dispatches shall have priority over any Charging Notice or Discharging Notice issued by Buyer or the Facility SC, as applicable, and Seller shall have no liability for violation of this Section 4.9 or any Charging Notice or Discharging Notice if and to the extent such violation is caused by Seller’s compliance with any CAISO Dispatch. During any time interval during the Delivery Term in which the Facility is capable of responding to a CAISO Dispatch, but the Facility deviates from a CAISO Dispatch or Seller negligently or intentionally fails to accurately communicate to Buyer the Facility’s availability, Seller shall be responsible for all CAISO charges and penalties resulting from such deviations (in addition to any Buyer remedy related to overcharging of the Facility as set forth in Section 4.9(c)).
(h) Pre-Commercial Operation Date Period. Prior to the Guaranteed Commercial Operation Date, Buyer shall have no rights to issue or cause to be issued Charging Notices or Discharging Notices, and Seller shall have exclusive rights to (i) charge and discharge the Facility and (ii) sell any and all available Resource Adequacy Benefits to a third party; provided that prior to selling Resource Adequacy Benefits pursuant to this Section 4.9(h) to any third party, Seller shall provide Buyer with a written offer to sell such Resource Adequacy Benefits to Buyer on the same terms and conditions that Seller would offer to a third party. If Buyer fails to accept such offer within ten (10) Business Days of receipt of such offer, Seller shall have the right to market and sell such Resource Adequacy Benefits to a third party. Notwithstanding any other provision of this Agreement, if Seller is able to sell Resource Adequacy Benefits prior to the Guaranteed Commercial Operation Date, the RA Guarantee Date shall be June 1, 2026. (i) Curtailments. Notwithstanding anything in this Agreement to the contrary, during any Settlement Interval, Curtailment Orders applicable to such Settlement Interval shall have priority over any Dispatch Notices applicable to such Settlement Interval, and Seller shall have no liability for violation of this Agreement or any Dispatch Notice if and to the extent such violation is caused by Seller’s compliance with any Curtailment Order or other instruction or direction from a Governmental Authority or the Transmission Provider. Buyer shall have the right, but not the obligation, to provide Seller with updated Dispatch Notices during any Curtailment Order, subject to availability of the Facility and the requirements and limitations set forth in this Agreement, including the Operating Restrictions.
(j) Station Use. Notwithstanding anything to the contrary in this Agreement, the Parties acknowledge (i) Seller is responsible for providing all Energy to serve Station Use (including paying the cost of any Energy used to serve Station Use during periods in which the Facility is not charging or discharging pursuant to a Charging Notice or Discharging Notice), (ii) Energy supplied from Charging Energy or Discharging Energy during periods in which the Facility is charging or discharging pursuant to a Charging Notice or Discharging Notice shall not be considered Station Use, (iii) Station Use may be supplied over the same circuit as Charging Energy and Discharging Energy, and (iv) Seller shall indemnify and hold harmless Buyer from any and 842
35 all costs, penalties or charges for Energy supplied for Station Use by any means other than retail service from the applicable utility, and shall take any additional measures to ensure Station Use (other than that supplied from Charging Energy or Discharging Energy as provided in clause (ii) or over the same circuit as Charging Energy and Discharging Energy as provided in clause (iii)) is supplied by the applicable utility’s retail service if necessary to avoid any such costs, penalties or charges.
(k) Seller’s Dispatch Rights. Notwithstanding anything to the contrary in this Agreement, and provided that Buyer has elected Seller as the Facility SC and only in such case, Seller shall have the right to charge or discharge the Facility (a “Seller Dispatch”) (i) in an amount not to exceed (x) 10,000 kwh per day and (y) twenty-seven (27) cycles during the Delivery Term and (ii) only during any period for which Buyer has not provided either a Charging Notice or Discharging Notice (such rights, “Seller’s Dispatch Rights”). Seller’s Dispatch Rights are subject to, and shall not interfere with, Buyer’s right to the Product. To the extent that a Seller Dispatch conflicts with a Buyer Charging Notice, Buyer Discharging Notice or CAISO Dispatch, such Buyer Notice or CAISO Dispatch shall take priority. Should a Seller Dispatch prevent Buyer from receiving any Product, Seller shall reimburse Buyer for any lost revenues for the period during which Buyer was prevented from receiving the Product.

4.10 Capacity Availability Notice.
(a) No less than thirty (30) days before the beginning of Commercial Operation, and thereafter ten (10) Business Days before the beginning of each month during the Delivery Term, Seller shall provide to Buyer and the SC (if applicable) a non-binding forecast of the hourly expected Available Capacity for each day of the following month in a form substantially similar to Exhibit F (“Monthly Forecast”).
(b) During the Delivery Term, no later than two (2) Business Days before each schedule day for the Day-Ahead Market in accordance with CAISO scheduling practices, Seller shall provide Buyer and the SC (if applicable) with an hourly schedule of the Available Capacity that the Facility is expected to have for each hour of such schedule day (the “Availability Notice”).

Seller shall provide Availability Notices (including updated Availability Notices) using the form attached in Exhibit G, or other form as reasonably requested by Buyer, by (in order of preference) electronic mail or telephonically to Buyer personnel or its Scheduling Coordinator designated to receive such communications.
(c) Seller shall notify Buyer and the SC (if applicable) as soon as practicable with an updated Monthly Forecast and Availability Notice, as applicable, if the Available Capacity of the Facility changes or is expected to change after Buyer’s receipt of a Monthly Forecast or Availability Notice. Seller shall accommodate Buyer’s reasonable requests for changes in the time of delivery of Availability Notices.

4.11 Excess Installed Capacity. It is acknowledged that Seller has the right and option in its discretion to install capacity in excess of the Guaranteed Capacity as back-up for the Installed Capacity and Effective Capacity. For all purposes of this Agreement, the amount of Installed Capacity or Effective Capacity shall never be deemed to exceed the Guaranteed Capacity, and (for the avoidance of doubt) Buyer shall have no rights to instruct Seller to (i) charge or discharge the 843
36 Facility at an instantaneous rate (in MW) in excess of the Effective Capacity or (ii) charge the Facility to a level (in MWh) in excess of the Effective Capacity multiplied by four (4) hours.

4.12 Outages
(a) Planned Outages.
(i) No later than January 15, April 15, July 15 and October 15 of each Contract Year, and at least sixty (60) days prior to the Commercial Operation Date, Seller shall submit to Buyer Seller’s schedule of proposed Planned Outages (“Outage Schedule”) for the following twelve (12)-month period in a form reasonably agreed to by Buyer. Seller shall endeavor to limit Planned Outages to periods of the day when Seller does not reasonably believe the Facility will be dispatched. Within twenty (20) Business Days after its receipt of an Outage Schedule, Buyer shall give Notice to Seller of any reasonable request for changes to the Outage Schedule, and Seller shall, consistent with Prudent Operating Practices, accommodate Buyer’s reasonable requests regarding the timing of any Planned Outage. Seller shall deliver to Buyer the final Outage Schedule no later than ten (10) days after receiving Buyer’s comments. (ii) If reasonably required in accordance with Prudent Operating Practices, Seller shall have the right, on no less than ninety (90) days advance Notice to Buyer, to propose changes to the Outage Schedule developed pursuant to Section 4.12(a)(i); provided, Seller shall schedule all Planned Outages within the time period determined by the CAISO for the Facility, as a Resource Adequacy Resource that is subject to the Availability Standards, to qualify for an “Approved Maintenance Outage” under the CAISO Tariff and Seller shall reimburse Buyer for any cost Buyer incurs in connection therewith (including replacement Capacity Attributes as required by the CAISO). For avoidance of doubt, if the CAISO requires substitution RA in order for the Outage to be an Approved Maintenance Outage, then Seller may procure such substitution RA from a third party and Buyer or the Facility SC, if applicable, will cooperate to allow Seller to make use of such substitution RA. Buyer may provide comments no later than ten (10) days after receiving Seller’s Notice of proposed changes to the Outage Schedule and shall permit any changes if doing so would not have a material adverse impact on Buyer and Seller agrees to reimburse Buyer for any costs or charges associated with such changes. (b) No Planned Outages During Summer Months. Notwithstanding anything in this Agreement to the contrary, no Planned Outages of the Facility shall be scheduled or planned from each June 1 through October 31 during the Delivery Term, unless approved by Buyer in writing in its sole discretion. In the event Seller has a previously Planned Outage that becomes coincident with a System Emergency, Seller shall make all reasonable efforts to reschedule such Planned Outage.
(c) Planned Outage Timing. To the extent commercially reasonable, Seller shall schedule maintenance outages (i) within a single month, rather than across multiple months, (ii) during periods in which CAISO does not require resource substitution or replacement, and (iii) otherwise in a manner to avoid reductions in the Resource Adequacy Benefits available from the Facility to Buyer.
(d) Notice of Unplanned Outages Seller shall notify Buyer and the Facility SC 844
37 no later than ten (10) minutes following Seller becoming aware of the occurrence of an Unplanned Outage, or if Seller has knowledge that an Unplanned Outage will occur, within twenty (20) minutes of determining that such Unplanned Outage will occur. Seller shall relay outage information to Buyer and the Facility SC as required by the CAISO Tariff within twenty (20) minutes of the Unplanned Outage. Seller shall communicate to Buyer and the Facility SC the estimated time of return of the Facility as soon as practical after Seller has knowledge thereof. (e) Inspection. In the event of an Unplanned Outage, Buyer shall have the option to inspect the Facility and all records relating thereto on any Business Day and at a reasonable time and Seller shall reasonably cooperate with Buyer during any such inspection.

Buyer shall comply with Seller’s safety and security rules and instructions during any inspection and shall not interfere with work on or operation of the Facility. (f) Reports of Outages. Seller shall promptly prepare and provide to Buyer, all reports of Unplanned Outages or Planned Outages that Buyer may reasonably require for the purpose of enabling Buyer to comply with CAISO requirements or any applicable Laws. Seller shall also report all Unplanned Outages or Planned Outages in the Daily Operating Report.

ARTICLE 5

TAXES, GOVERNMENTAL COSTS

5.1 Allocation of Taxes and Charges. Seller shall pay or cause to be paid all Taxes on or with respect to the Facility or on or with respect to the sale and making available of Product to Buyer, that are imposed on Product prior to its delivery to Buyer at the time and place contemplated under this Agreement (other than withholding or other Taxes imposed on Buyer’s income, revenue, receipts or employees). Buyer shall pay or cause to be paid all Taxes on or with respect to the delivery to and purchase by Buyer of Product that are imposed on Product at and after its delivery to Buyer at the time and place contemplated under this Agreement (other than withholding or other Taxes imposed on Seller’s income, revenue, receipts or employees) or on Buyer Charging Energy prior to its delivery to Seller. If a Party is required to remit or pay Taxes that are the other Party’s responsibility hereunder, such Party shall promptly pay the Taxes due and then seek and receive reimbursement from the other for such Taxes. In the event any sale of Product hereunder is exempt from or not subject to any particular Tax, Buyer shall provide Seller with all necessary documentation to evidence such exemption or exclusion within thirty (30) days after the date Buyer makes such claim. Buyer shall indemnify, defend, and hold Seller harmless from any liability with respect to Taxes for which Buyer is responsible hereunder and from which Buyer claims it is exempt.

5.2 Cooperation. Each Party shall use commercially reasonable efforts to implement the provisions of and administer this Agreement in accordance with the intent of the Parties to minimize all Taxes, so long as no Party is materially adversely affected by such efforts. The Parties shall cooperate to minimize Tax exposure; provided, neither Party shall be obligated to incur any financial or operational burden to reduce Taxes for which the other Party is responsible hereunder without receiving due compensation therefor from the other Party. All Product delivered by Seller to Buyer hereunder shall be a sale made at wholesale, with Buyer reselling such Product. 845
38 ARTICLE 6

MAINTENANCE AND REPAIR OF THE FACILITY

6.1 Maintenance of the Facility.
(a) Seller shall, as between Seller and Buyer, be solely responsible for the operation, inspection, maintenance and repair of the Facility, and any portion thereof, in accordance with applicable Law and Prudent Operating Practices. Seller shall maintain and deliver maintenance and repair records of the Facility to Buyer’s scheduling representative upon request.

Nothing herein shall limit Seller’s right to replace or augment existing batteries and other equipment to maintain the capacity of the Facility.
(b) Seller shall promptly make all necessary repairs to the Facility, and any portion thereof, and take all actions necessary in order to provide the Product to Buyer in accordance with the terms of this Agreement (and, at a minimum, the Guaranteed Availability and the Guaranteed Efficiency Rate).

6.2 Maintenance of Health and Safety. Seller shall take reasonable safety precautions with respect to the operation, maintenance, repair and replacement of the Facility. If Seller becomes aware of any circumstances relating to the Facility that create an imminent risk of damage or injury to any Person or any Person’s property, Seller shall take prompt, reasonable action to prevent such damage or injury and shall give Buyer’s emergency contact identified in Exhibit N Notice of such condition. Such action may include disconnecting and removing all or a portion of the Facility or suspending the supply of Discharging Energy to the Delivery Point.

6.3 Shared Facilities. The Parties acknowledge and agree that certain of the Shared Facilities and Interconnection Facilities, and Seller’s rights and obligations under the Interconnection Agreement, may be subject to certain shared facilities and/or co-tenancy agreements to be entered into among Seller, the Transmission Provider, Seller’s Affiliates, and/or third parties. Seller agrees that any agreements regarding Shared Facilities (i) shall permit Seller to perform or satisfy, and shall not purport to limit, Seller’s obligations hereunder, (ii) shall provide for separate metering of the Facility; (iii) shall not reduce the interconnection capacity under the Interconnection Agreement available for the Facility’s sole use below the Dedicated Interconnection Capacity; (iv) shall provide that any other generating or energy storage facilities not included in the Facility but using Shared Facilities shall not be included within the Facility’s CAISO Resource ID; and (iv) shall provide that any curtailment or restriction of Shared Facility capacity not attributable to a specific project or projects shall be allocated to all generating or storage facilities utilizing the Shared Facilities based on their pro rata allocation of the Shared Facility capacity prior to such curtailment or reduction. Seller shall not, and shall not permit any Affiliate to, allocate to other Persons a share of the total interconnection capacity under the Interconnection Agreements in excess of an amount equal to the total interconnection capacity under the Interconnection Agreements minus the Dedicated Interconnection Capacity.

ARTICLE 7

METERING
846
39 7.1 Metering. Seller shall measure the amount of Charging Energy and Discharging Energy using the Facility Meter. The Facility Meter will be operated pursuant to applicable CAISO-approved calculation methodologies and maintained at Seller’s cost. Subject to meeting any applicable CAISO requirements, the Facility Meter shall be programmed to adjust for Electrical Losses and Station Use, as applicable, from such meters to the Delivery Point in a manner subject to Buyer’s prior written approval, not to be unreasonably withheld. Seller shall separately meter all Station Use. Metering shall be consistent with the Metering Diagram set forth as Exhibit R, a final version of which shall be provided to Buyer at least thirty (30) days before the Commercial Operation Date. The Facility Meter shall be kept under seal, such seals to be broken only when the Facility Meter is to be tested, adjusted, modified or relocated. In the event Seller breaks a seal, Seller shall notify Buyer as soon as practicable. In addition, Seller hereby agrees to provide all Facility Meter data to Buyer in a form reasonably acceptable to Buyer, and consents to Buyer obtaining from CAISO the CAISO meter data directly relating to the Facility and all inspection, testing and calibration data and reports. Seller and Buyer shall cooperate to allow both Parties to retrieve the meter reads from the CAISO Market Results Interface - Settlements (MRI-S) web and/or directly from the CAISO meter(s) at the Facility.

7.2 Meter Verification. Seller shall use commercially reasonable efforts to request permission from CAISO to test the Facility Meter at least annually and more frequently than annually if Buyer or Seller reasonably believe there may be a meter malfunction. The tests shall be conducted by independent third parties qualified to conduct such tests. Buyer shall be notified seven (7) days in advance of such tests and have a right to be present during such tests. If a Facility Meter is inaccurate, it shall be promptly repaired or replaced. If a meter is inaccurate by more than one percent (1%) and it is not known when the Facility Meter inaccuracy commenced (if such evidence exists, then such date will be used to adjust prior invoices), then the invoices covering the period of time since the last Facility Meter test shall be adjusted for the amount of the inaccuracy on the assumption that the inaccuracy persisted during one-half of such period if such adjustments are accepted by CAISO; provided, such period may not exceed twelve (12) months.

ARTICLE 8
INVOICING AND PAYMENT; CREDIT

8.1 Invoicing. Seller shall use commercially reasonable efforts to deliver an invoice to Buyer for Product within ten (10) days after the end of the prior monthly delivery period. Each invoice shall reflect (a) records of metered data, including (i) CAISO metering and transaction data sufficient to document and verify the amount of Product delivered by the Facility for any Settlement Period during the preceding month, including the amount of Buyer Charging Energy, Buyer Discharging Energy, and the amount of Replacement RA delivered to Buyer (if any) and (ii) Seller’s records of metered data, including data showing a calculation of the Monthly Capacity Payment and other relevant data for the prior month; and (b) be in a format reasonably specified by Buyer, covering the Product provided in the preceding month determined in accordance with the applicable provisions of this Agreement. Buyer shall, and shall cause its Scheduling Coordinator to, provide Seller with all reasonable access (including, in real time, to the maximum extent reasonably possible) to any records, including invoices or settlement data from the CAISO, forecast data and other information, all as may be necessary from time to time for Seller to prepare and verify the accuracy of all invoices. The invoice shall be delivered by electronic mail in accordance with Exhibit N.
847
40 8.2 Payment. Buyer shall make payment to Seller of Monthly Capacity Payments for Product by wire transfer or ACH payment to the bank account provided on each monthly invoice.

Buyer shall pay undisputed invoice amounts within thirty (30) days of Buyer’s receipt of Seller’s invoices; provided, if such due date falls on a weekend or legal holiday, such due date shall be the next Business Day. Payments made after the due date will be considered late and will bear interest on the unpaid balance. If the amount due is not paid on or before the due date or if any other payment that is due and owing from one Party to another is not paid on or before its applicable due date, a late payment charge shall be applied to the unpaid balance and shall be added to the next billing statement. Such late payment charge shall be calculated based on an annual Interest Rate equal to the prime rate published on the date of the invoice in The Wall Street Journal (or, if The Wall Street Journal is not published on that day, the next succeeding date of publication), plus two percent (2%) (the “Interest Rate”). If the due date occurs on a day that is not a Business Day, the late payment charge shall begin to accrue on the next succeeding Business Day.

8.3 Books and Records. To facilitate payment and verification, each Party shall maintain all books and records necessary for billing and payments, including copies of all invoices under this Agreement, for a period of at least two (2) years or as otherwise required by Law. Upon fifteen (15) days’ Notice to the other Party, either Party shall be granted reasonable access to the accounting books and records within the possession or control of the other Party pertaining to all invoices generated pursuant to this Agreement. Seller acknowledges that in accordance with California Government Code Section 8546.7, Seller may be subject to audit by the California State Auditor with regard to Seller’s performance of this Agreement because the compensation under this Agreement exceeds Ten Thousand Dollars ($10,000).

8.4 Payment Adjustments; Billing Errors. Payment adjustments shall be made if Buyer or Seller discovers there have been good faith inaccuracies in invoicing that are not otherwise disputed under Section 8.5 or an adjustment to an amount previously invoiced or paid is required due to a correction of data by the CAISO, or there is determined to have been a Facility Meter inaccuracy sufficient to require a payment adjustment. If the required adjustment is in favor of Buyer, Buyer’s next monthly payment shall be credited in an amount equal to the adjustment.

If the required adjustment is in favor of Seller, Seller shall add the adjustment amount to Buyer’s next monthly invoice. Adjustments in favor of either Buyer or Seller shall bear interest, until settled in full, in accordance with Section 8.2, accruing from the date on which the adjusted amount should have been due.

8.5 Billing Disputes. A Party may, in good faith, dispute the correctness of any invoice or any adjustment to an invoice rendered under this Agreement or adjust any invoice for any arithmetic or computational error within twelve (12) months of the date the invoice, or adjustment to an invoice, was rendered. In the event an invoice or portion thereof, or any other claim or adjustment arising hereunder, is disputed, payment of the undisputed portion of the invoice shall be required to be made when due. Any invoice dispute or invoice adjustment shall be in writing and shall state the basis for the dispute or adjustment. Payment of the disputed amount shall not be required until the dispute is resolved. Upon resolution of the dispute, any required payment shall be made within thirty (30) days of such resolution along with interest accrued at the Interest Rate from and including the original due date to but excluding the date paid. Inadvertent overpayments shall be returned via adjustments in accordance with Section 8.4. Any dispute with respect to an invoice is waived if the other Party is not notified in accordance with this Section 8.5 848
41 within twelve (12) months after the invoice is rendered or subsequently adjusted, except to the extent any misinformation was from a third party not affiliated with any Party and such third party corrects its information after the twelve-month period. If an invoice is not rendered within twelve (12) months after the close of the month during which performance occurred, the right to payment for such performance is waived.

8.6 Netting of Payments. The Parties hereby agree that they shall discharge mutual debts and payment obligations due and owing to each other on the same date through netting, in which case all amounts owed by each Party to the other Party for the purchase and sale of Product during the monthly billing period under this Agreement or otherwise arising out of this Agreement, including any related damages calculated pursuant to Exhibits B and P, interest, and payments or credits, shall be netted so that only the excess amount remaining due shall be paid by the Party who owes it.

8.7 Seller’s Development Security. To secure its obligations under this Agreement, Seller shall (a) deliver the Development Security to Buyer in an amount equal to the amount set forth for the Development Security on the Cover Sheet within thirty (30) days of the Effective Date. Seller shall maintain the Development Security in full force and effect until Buyer is required to return such Development Security hereunder. Within five (5) Business Days following any draw by Buyer on the Development Security, Seller shall replenish the amount drawn such that the Development Security is restored to the applicable amount; Upon
the earlier of (a) Seller’s delivery of the Performance Security, or (b) sixty (60) days after termination of this Agreement, Buyer shall return the Development Security to Seller, less the amounts drawn in accordance with this Agreement. If the Development Security is a Letter of Credit and the issuer of such Letter of Credit (i) fails to maintain the minimum Credit Rating specified in the definition of Letter of Credit, (ii) indicates its intent not to renew such Letter of Credit and such Letter of Credit expires prior to the Commercial Operation Date, or (iii) fails to honor Buyer’s properly documented request to draw on such Letter of Credit by such issuer, Seller shall have ten (10) Business Days to either post cash or deliver a substitute Letter of Credit that meets the requirements set forth in the definition of Development Security. If requested by Seller, Buyer shall from time to time reasonably cooperate with Seller to enable Seller to exchange one permitted form of Development Security for another permitted form.

8.8 Seller’s Performance Security. To secure its obligations under this Agreement, Seller shall deliver Performance Security to Buyer on or before the Commercial Operation Date.

If the Performance Security is not in the form of cash or Letter of Credit, it shall be substantially in the form of Guaranty set forth in Exhibit L. Seller shall maintain the Performance Security in full force and effect, and Seller shall within five (5) Business Days after any draw thereon replenish the Performance Security in the event Buyer collects or draws down any portion of the Performance Security for any reason permitted under this Agreement other than to satisfy a Termination Payment, until the following have occurred: (a) the Delivery Term has expired or terminated early; and (b) all payment obligations of Seller due and payable under this Agreement, including compensation for penalties, Termination Payment, indemnification payments or other damages are paid in full (whether directly or indirectly such as through set-off or netting).

Following the occurrence of both events, Buyer shall promptly return to Seller the unused portion 849
42 of the Performance Security. If the Performance Security is a Letter of Credit and the issuer of such Letter of Credit (i) fails to maintain the minimum Credit Rating set forth in the definition of Letter of Credit, (ii) indicates its intent not to renew such Letter of Credit and such Letter of Credit expires prior to the Commercial Operation Date, or (iii) fails to honor Buyer’s properly documented request to draw on such Letter of Credit by such issuer, Seller shall have ten (10) Business Days to either post cash or deliver a substitute Letter of Credit (or other instrument) that meets the requirements set forth in the definition of Performance Security. If requested by Seller, Buyer shall from time to time reasonably cooperate with Seller to enable Seller to exchange one permitted form of Performance Security for another permitted form. If the Development Security was posted as a Letter of Credit, then Buyer shall reasonably cooperate with Seller to amend or modify such Letter of Credit so that such Letter of Credit satisfies the requirements of the Performance Security.

8.9 First Priority Security Interest in Cash or Cash Equivalent Collateral. To secure its obligations under this Agreement, and until released as provided herein, Seller hereby grants to Buyer a present and continuing first-priority security interest (“Security Interest”) in, and lien on (and right to net against), and assignment of any cash collateral posted as the Development Security or Performance Security pursuant to Sections 8.7 and 8.8 and any and all interest thereon or proceeds resulting therefrom or from the liquidation thereof, whether now or hereafter held by, on behalf of, or for the benefit of Buyer, and Seller agrees to take all action as Buyer reasonably requires in order to perfect Buyer’s Security Interest in, and lien on (and right to net against), such collateral and any and all proceeds resulting therefrom or from the liquidation thereof.

Upon or any time after the occurrence and continuation of an Event of Default caused by Seller, an Early Termination Date resulting from an Event of Default caused by Seller, or an occasion provided for in this Agreement where Buyer is authorized to retain all or a portion of the Development Security or Performance Security, Buyer may do any one or more of the following (in each case subject to the final sentence of this Section 8.9):
(a) Exercise any of its rights and remedies with respect to the Development Security and Performance Security, including any such rights and remedies under Law then in effect;
(b) Draw on any outstanding Letter of Credit issued for its benefit and retain any cash held by Buyer as Development Security or Performance Security; and (c) Liquidate all Development Security or Performance Security (as applicable) then held by or for the benefit of Buyer free from any claim or right of any nature whatsoever of Seller, including any equity or right of purchase or redemption by Seller.

Buyer shall apply the proceeds of the collateral realized upon the exercise of any such rights or remedies to reduce Seller’s obligations under this Agreement (Seller remains liable for any amounts owing to Buyer after such application), subject to Buyer’s obligation to return any surplus proceeds remaining after such obligations are satisfied in full.

8.10 Financial Statements. In the event a Guaranty is provided as Performance Security 850
43 in lieu of cash or a Letter of Credit, Seller shall provide to Buyer, or cause the Guarantor to provide to Buyer, unaudited quarterly and annual audited financial statements of the Guarantor (including a balance sheet and statements of income and cash flows), all prepared in accordance with generally accepted accounting principles in the United States, consistently applied.

ARTICLE 9

NOTICES

9.1 Addresses for the Delivery of Notices. Any Notice required, permitted, or contemplated hereunder shall be in writing, shall be addressed to the Party to be notified at the address set forth in Exhibit N or at such other address or addresses as a Party may designate for itself from time to time by Notice hereunder.

9.2 Acceptable Means of Delivering Notice. Each Notice required, permitted, or contemplated hereunder shall be deemed to have been validly served, given or delivered as follows: (a) if sent by United States mail with proper first class postage prepaid, three (3) Business Days following the date of the postmark on the envelope in which such Notice was deposited in the United States mail; (b) if sent by a regularly scheduled overnight delivery carrier with delivery fees either prepaid or an arrangement with such carrier made for the payment of such fees, the next Business Day after the same is delivered by the sending Party to such carrier; (c) if sent by electronic communication (including electronic mail or other electronic means) at the time indicated by the time stamp upon delivery and, if after 5 pm, on the next Business Day; or (d) if delivered in person, upon receipt by the receiving Party. Notwithstanding the foregoing, Notices of outages or other scheduling or dispatch information or requests, may be sent by electronic communication and shall be considered delivered upon successful completion of such transmission.

ARTICLE 10

FORCE MAJEURE

10.1 Definition.
(a) “Force Majeure Event” means any act or event that delays or prevents a Party from timely performing all or a portion of its obligations under this Agreement or from complying with all or a portion of the conditions under this Agreement if such act or event, despite the exercise of commercially reasonable efforts, cannot be avoided by and is beyond the reasonable control (whether direct or indirect) of and without the fault or negligence of the Party relying thereon as justification for such delay, nonperformance, or noncompliance. (b) Without limiting the generality of the foregoing, so long as the following events, despite the exercise of reasonable efforts, cannot be avoided by, and are beyond the reasonable control (whether direct or indirect) of and without the fault or negligence of the Party relying thereon as justification for such delay, nonperformance or noncompliance, a Force Majeure Event may include an act of God or the elements, such as flooding, lightning, hurricanes, tornadoes, or ice storms; explosion; fire; volcanic eruption; flood; epidemic; pandemic; landslide; mudslide; sabotage; terrorism; earthquake; or other cataclysmic events; an act of public enemy; 851
44 war; blockade; civil insurrection; riot; civil disturbance; or strikes or other labor difficulties caused or suffered by a Party or any third party except as set forth below. (c) Notwithstanding the foregoing, the term “Force Majeure Event” does not include (i) economic conditions or changes in Law that render a Party’s performance of this Agreement at the Contract Price unprofitable or otherwise uneconomic (including an increase in component or compliance costs for any reason, including foreign or domestic tariffs, Buyer’s ability to buy Product at a lower price, or Seller’s ability to sell the Product, or any component thereof, at a higher price, than under this Agreement), except to the extent caused by a Force Majeure Event; (ii) Seller’s inability to obtain permits or approvals of any type for the construction, operation, or maintenance of the Facility, except to the extent such inability is caused by a Force Majeure Event; (iii) the inability of a Party to make payments when due under this Agreement, unless the cause of such inability is an event that would otherwise constitute a Force Majeure Event as described above that disables physical or electrical facilities necessary to transfer funds to the payee party; (iv) a Curtailment Order, except to such extent such Curtailment Order is caused by a Force Majeure Event; (v) Seller’s inability to obtain sufficient labor, equipment, materials, or other resources to build or operate the Facility, including the lack of wind, sun or other fuel source of an inherently intermittent nature, except to the extent such inability is caused by a Force Majeure Event; (vi) a strike, work stoppage or labor dispute limited only to any one or more of Seller, Seller’s Affiliates, Seller’s contractors, their subcontractors thereof or any other third party employed by Seller to work on the Facility, except to the extent any work stoppage is caused by a Force Majeure Event; (vii) any equipment failure except if such equipment failure is caused by a Force Majeure Event; (viii) events otherwise constituting a Force Majeure Event that prevents Seller from achieving Construction Start or Commercial Operation of the Facility, except to the extent expressly permitted as an extension under this Agreement; or (ix) any action or inaction by any third party, including Transmission Provider, that delays or prevents the approval, construction or placement in service of any Interconnection Facilities or Network Upgrades, except to the extent caused by a Force Majeure Event.

10.2 No Liability If a Force Majeure Event Occurs. Except as provided in Section 4 of Exhibit B, neither Seller nor Buyer shall be liable to the other Party in the event it is prevented or delayed from performing its obligations hereunder in whole or in part due to a Force Majeure Event. The Party rendered unable (or delayed) to fulfill any obligation by reason of a Force Majeure Event shall take commercially reasonable actions necessary to remove such inability or delay with due speed and diligence. Nothing herein shall be construed as permitting that Party to continue to fail to perform or delay after said cause has been removed. The obligation to use due speed and diligence shall not be interpreted to require resolution of labor disputes by acceding to demands of the opposition when such course is inadvisable in the discretion of the Party having such difficulty. Neither Party shall be considered in breach or default of this Agreement if and to the extent that any failure or delay in the Party’s performance of one or more of its obligations hereunder is caused by a Force Majeure Event. Notwithstanding the foregoing, the occurrence and continuation of a Force Majeure Event shall not (a) suspend or excuse the obligation of a Party to make any payments due hereunder unless the cause of such inability is an event that would otherwise constitute a Force Majeure Event as described above that disables physical or electrical facilities necessary to transfer funds to the payee Party, or (b) subject to Section 5 of Exhibit B, suspend or excuse the obligation of Seller to achieve the Guaranteed Construction Start Date or the Guaranteed Commercial Operation Date beyond the extensions provided in Section 4 of 852
45 Exhibit B, or (c) limit Buyer’s right to declare an Event of Default pursuant to Section 11.1(b)(ii) after all applicable extensions of the Guaranteed Construction Start Date and the Guaranteed Commercial Operation Date and receive a Damage Payment upon exercise of Buyer’s remedies pursuant to Section 11.2.

10.3 Notice. Within four (4) Business Days of the claiming Party’s awareness of the impact of Force Majeure Event, the claiming Party shall provide the other Party with oral notice of the Force Majeure Event, and within two (2) weeks of the claiming Party’s awareness of the impact of the Force Majeure Event the claiming Party shall provide the other Party with notice in the form of a letter describing in detail the occurrence giving rise to the Force Majeure Event, including the nature, cause, estimated date of commencement thereof, and the anticipated extent of any delay or interruption in performance. Failure to provide timely notice constitutes a waiver of a Force Majeure Event claim as to all periods prior to the delivery of a timely Notice solely if Buyer is materially and adversely impacted by such failure. Upon written request from Buyer, Seller shall provide documentation demonstrating to Buyer’s reasonable satisfaction that each day of the claimed delay was the result of a Force Majeure Event and did not result from Seller’s actions or failure to exercise due diligence or take reasonable actions. The claiming party shall promptly notify the other Party in writing of the cessation or termination of such Force Majeure Event, all as known or estimated in good faith by the affected Party. The suspension of performance due to a claim of Force Majeure must be of no greater scope and of no longer duration than is required by the Force Majeure Event.

ARTICLE 11
DEFAULTS; REMEDIES; TERMINATION

11.1 Events of Default. An “Event of Default” shall mean, (a) with respect to a Party (the “Defaulting Party”) that is subject to the Event of Default the occurrence of any of the following:
(i) the failure by such Party to make, when due, any payment required pursuant to this Agreement and such failure is not remedied within ten (10) Business Days after Notice thereof;
(ii) any representation or warranty made by such Party herein is false or misleading in any material respect when made, and such default is not remedied within thirty (30) days after Notice thereof (or such longer additional period, not to exceed an additional sixty (60) 853
46 days, if the Defaulting Party is unable to remedy such default within such initial thirty (30)-day period despite exercising commercially reasonable efforts); (iii) the failure by such Party to perform any material covenant or obligation set forth in this Agreement (except to the extent constituting a separate Event of Default set forth in this Section 11.1; and except for (A) failure to provide Capacity Attributes, the exclusive remedies for which are set forth in Section 3.5, (B) failures related to the Monthly Capacity Availability that do not trigger the provisions of Section 11.1(b)(iii), the exclusive remedies for which are set forth in Exhibit C and Exhibit P, and (C) failure to maintain the Guaranteed Efficiency Rate that does not trigger the provisions of Section 11.1(b)(iv), the exclusive remedies for which are set forth in Exhibit C), and such failure is not remedied within thirty (30) days after Notice thereof (or such longer additional period, not to exceed an additional ninety (90) days, if the Defaulting Party is unable to remedy such default within such initial thirty (30)-day period despite exercising commercially reasonable efforts); (iv) such Party becomes Bankrupt;
(v) such Party assigns this Agreement or any of its rights hereunder other than in compliance with Article 14, if applicable; or (vi) such Party consolidates or amalgamates with, or merges with or into, or transfers all or substantially all of its assets to, another entity and, at the time of such consolidation, amalgamation, merger or transfer, the resulting, surviving or transferee entity fails to assume all the obligations of such Party under this Agreement to which it or its predecessor was a party by operation of Law or pursuant to an agreement reasonably satisfactory to the other Party. (b) with respect to Seller as the Defaulting Party, the occurrence of any of the following:
(i) if at any time, Seller delivers or attempts to deliver Energy to the Delivery Point that was not discharged by the Facility; (ii) the failure by Seller to (A) achieve Construction Start on or before the Guaranteed Construction Start Date, as such date may be extended by Seller’s payment of Daily Delay Damages pursuant to Section 1(b) of Exhibit B and/or a Development Cure Period pursuant to Section 4 of Exhibit B, or (B) achieve Commercial Operation on or before the Guaranteed Commercial Operation Date, as such date may be adjusted pursuant to Section 2(a) of Exhibit B and extended by Seller’s payment of Commercial Operation Delay Damages pursuant to Section 2(b) of Exhibit B and/or a Development Cure Period pursuant to Section 4 of Exhibit B;
(iii) if, in any Contract Year, the simple average of the Monthly Capacity Availability for such Contract Year is and
Seller fails to (x) deliver to Buyer within ten (10) Business Days after Notice from Buyer a plan or report developed by Seller that describes the cause of the failure of the simple average of the Monthly Capacity Availability calculations for such Contract Year and the actions that Seller has taken, is taking, or proposes to take in an effort to cure such condition along with the written confirmation of a Licensed Professional Engineer that such plan 854
47 or report is in accordance with Prudent Operating Practices and capable of cure within a reasonable period of time, not to exceed one hundred eighty (180) days (“Cure Plan”) and (y) complete such Cure Plan in all material respects as set forth therein, including within the timeframe set forth therein;
(iv) if, Seller fails to maintain an average Efficiency Rate equal to or greater than the Minimum Efficiency Rate over a rolling twelve (12) month period; (v) if not remedied within ten (10) days after Notice thereof, the failure by Seller to deliver a Remedial Action Plan required under Section 2.4 that demonstrates a reasonable plan for completing the Facility by the Guaranteed Commercial Operation Date; (vi) Seller sells, assigns, or otherwise transfers, or commits to sell, assign, or otherwise transfer, the Product, or any portion thereof, during the Delivery Term to any party other than Buyer except as expressly permitted under this Agreement; (vii) if Seller fails to maintain an Effective Capacity of the Installed Capacity for more than three hundred sixty (360) consecutive days;
(viii) failure by Seller to satisfy the collateral requirements pursuant to Sections 8.7 or 8.8 within ten (10) Business Days after Notice from Buyer, including the failure to replenish the Performance Security amount in accordance with this Agreement in the event Buyer draws against it for any reason other than to satisfy a Termination Payment; (ix) with respect to any outstanding Letter of Credit provided for the benefit of Buyer that is not then required under this Agreement to be canceled or returned, the failure by Seller to provide for the benefit of Buyer either (1) cash, or (2) a Letter of Credit from a different issuer meeting the criteria set forth in the definition of Letter of Credit, in each case, in the amount required hereunder within ten (10) Business Days after Seller receives Notice of the occurrence of any of the following events:
(A) the issuer of the outstanding Letter of Credit shall fail to maintain a Credit Rating of at least A- by S&P or A3 by Moody’s; (B) the issuer of such Letter of Credit becomes Bankrupt; (C) the issuer of the outstanding Letter of Credit shall fail to comply with or perform its obligations under such Letter of Credit and such failure shall be continuing after the lapse of any applicable grace period permitted under such Letter of Credit;
(D) the issuer of the outstanding Letter of Credit shall fail to honor a properly documented request to draw on such Letter of Credit; (E) the issuer of the outstanding Letter of Credit shall disaffirm, disclaim, repudiate or reject, in whole or in part, or challenge the validity of, such Letter of Credit;
855
48 (F) such Letter of Credit fails or ceases to be in full force and effect at any time; or
(G) Seller shall fail to renew or cause the renewal of each outstanding Letter of Credit on a timely basis as provided in the relevant Letter of Credit and as provided in accordance with this Agreement, and in no event less than twenty (20) days prior to the expiration of the outstanding Letter of Credit.

11.2 Remedies; Declaration of Early Termination Date. If an Event of Default with respect to a Defaulting Party shall have occurred and be continuing, the other Party (“Non-Defaulting Party”) shall have the following rights:
(a) to send Notice, designating a day, no earlier than the day such Notice is deemed to be received and no later than twenty (20) days after such Notice is deemed to be received, as an early termination date of this Agreement (“Early Termination Date”) that terminates this Agreement (the “Terminated Transaction”) and ends the Delivery Term effective as of the Early Termination Date;
(b) to accelerate all amounts owing between the Parties, and to collect as liquidated damages (i) the Damage Payment, or (ii) the Termination Payment, as applicable, in each case calculated in accordance with Section 11.3 below; (c) to withhold any payments due to the Defaulting Party under this Agreement; (d) to suspend performance; and
(e) to exercise any other right or remedy available at law or in equity, including specific performance or injunctive relief, except to the extent such remedies are expressly limited under this Agreement; provided, payment by the Defaulting Party of the Damage Payment or Termination Payment, as applicable, shall constitute liquidated damages and the Non-Defaulting Party’s sole and exclusive remedy for any Terminated Transaction and the Event of Default related thereto.

Notwithstanding the foregoing, in the event that a Seller Event of Default occurs under Section

11.1(b)(ii), and Buyer as the Non-Defaulting Party does not establish any Early Termination Date within thirty (30) days following the occurrence of such Seller Event of Default, then Seller may in its sole discretion terminate this Agreement upon written Notice to Buyer that designates an Early Termination Date, and Buyer shall be entitled to the remedies set forth in this Section 11.2 subject to the limitations set forth in Article 12.

11.3 Damage Payment; Termination Payment. If an Early Termination Date has been declared, the Non-Defaulting Party shall calculate, in a commercially reasonable manner, the Damage Payment or Termination Payment, as applicable, in accordance with this Section 11.3. (a) Damage Payment Prior to Commercial Operation Date. If the Early Termination Date occurs before the Commercial Operation Date, then the Damage Payment shall be calculated in accordance with this Section 11.3(a).
856
49 (i) If Seller is the Defaulting Party, then the Damage Payment shall be owed to Buyer and shall be a dollar amount that equals the entire amount of the Development Security plus, if the Development Security is posted as cash, any interest accrued thereon. Buyer shall be entitled to retain all Daily Delay Damages and Commercial Operation Delay Damages paid prior to the Termination Date and immediately retain for its own benefit those funds held as Development Security and any interest accrued thereon if the Development Security is posted as cash, and any amount of Development Security that Seller has not yet posted with Buyer shall be immediately due and payable by Seller to Buyer. There will be no amounts owed to Seller. The Parties agree that Buyer’s damages in the event of an Early Termination Date prior to the Commercial Operation Date caused by Seller’s Event of Default would be difficult or impossible to determine and that the damages set forth in this Section 11.3(a)(i) are a reasonable approximation of Buyer’s harm or loss.
(ii) If Buyer is the Defaulting Party, then a Damage Payment shall be owed to Seller and shall equal the aggregate of all Settlement Amounts plus any and all other amounts due to or from Seller (as of the Early Termination Date) netted into a single amount.

There will be no amount owed to Buyer. Seller shall calculate, in a commercially reasonable manner, a Settlement Amount for the Terminated Transaction as of the Early Termination Date.

Third parties supplying information for purposes of the calculation of Gains or Losses may include, without limitation, dealers in the relevant markets, end-users of the relevant product, information vendors and other sources of market information. The Settlement Amount shall not include consequential, incidental, punitive, exemplary, indirect or business interruption damages. Without prejudice to Seller’s duty to mitigate, Seller shall not have to enter into replacement transactions to establish a Settlement Amount. The Parties agree that Seller’s damages in the event of an Early Termination Date prior to the Commercial Operation Date caused by Buyer’s default would be difficult or impossible to determine and that the damages set forth in this Section 11.3(a)(ii) are a reasonable approximation of Seller’s harm or loss.
(b) Termination Payment On or After the Commercial Operation Date. The payment owed by the Defaulting Party to the Non-Defaulting Party for a Terminated Transaction occurring after the Commercial Operation Date (“Termination Payment”) shall be the aggregate of all Settlement Amounts plus any and all other amounts due to or from the Non-Defaulting Party (as of the Early Termination Date) netted into a single amount. The Non-Defaulting Party shall calculate, in a commercially reasonable manner, a Settlement Amount for the Terminated Transaction as of the Early Termination Date. Third parties supplying information for purposes of the calculation of Gains or Losses may include, without limitation, dealers in the relevant markets, end-users of the relevant product, information vendors and other sources of market information.

The Settlement Amount shall not include consequential, incidental, punitive, exemplary, indirect or business interruption damages. Without prejudice to the Non-Defaulting Party’s duty to mitigate, the Non-Defaulting Party shall not have to enter into replacement transactions to establish a Settlement Amount. Each Party agrees and acknowledges that (i) the actual damages that the Non-Defaulting Party would incur in connection with a Terminated Transaction would be difficult or impossible to predict with certainty, (ii) the Termination Payment described in this Section

11.3(b) is a reasonable and appropriate approximation of such damages, and (iii) the Termination Payment described in this Section 11.3(b) is the exclusive remedy of the Non-Defaulting Party in connection with a Terminated Transaction but shall not otherwise act to limit any of the Non-857 50 Defaulting Party’s rights or remedies if the Non-Defaulting Party does not elect a Terminated Transaction as its remedy for an Event of Default by the Defaulting Party.

11.4 Notice of Payment of Termination Payment or Damage Payment. As soon as practicable after a Terminated Transaction, but in no event later than sixty (60) days after the Early Termination Date (or such longer additional period, not to exceed an additional sixty (60) days, if the Non-Defaulting Party is unable, despite using commercially reasonable efforts, to calculate the Termination Payment or Damage Payment, as applicable, within such initial sixty (60)-day period despite exercising commercially reasonable efforts), Notice shall be given by the Non-Defaulting Party to the Defaulting Party of the amount of the Damage Payment or Termination Payment, as applicable, and whether the Termination Payment or Damage Payment, as applicable, is due to or from the Non-Defaulting Party. The Notice shall include a written statement explaining in reasonable detail the calculation of such amount and the sources for such calculation. The Termination Payment or Damage Payment, as applicable, shall be made to or from the Non-Defaulting Party, as applicable, within ten (10) Business Days after such Notice is effective.

11.5 Disputes With Respect to Termination Payment or Damage Payment. If the Defaulting Party disputes the Non-Defaulting Party’s calculation of the Termination Payment or Damage Payment, as applicable, in whole or in part, the Defaulting Party shall, within five (5) Business Days of receipt of the Non-Defaulting Party’s calculation of the Termination Payment or Damage Payment, as applicable, provide to the Non-Defaulting Party a detailed written explanation of the basis for such dispute. Disputes regarding the Termination Payment or Damage Payment, as applicable, shall be determined in accordance with Article 15. 858
51 11.7 Rights And Remedies Are Cumulative. Except where liquidated damages or other remedy are explicitly provided as the exclusive remedy herein, the rights and remedies of a Party pursuant to this Article 11 shall be cumulative and in addition to the rights of the Parties otherwise provided in this Agreement.

11.8 Mitigation. Any Non-Defaulting Party shall be obligated to use commercially reasonable efforts to mitigate its Costs, Losses and damages resulting from any Event of Default of the other Party under this Agreement.

ARTICLE 12
LIMITATION OF LIABILITY AND EXCLUSION OF WARRANTIES.

12.1 No Consequential Damages. EXCEPT TO THE EXTENT (A) PART OF AN

EXPRESS REMEDY OR MEASURE OF DAMAGES HEREIN, (B) PART OF A THIRD PARTY INDEMNITY CLAIM UNDER ARTICLE 16, (C) INCLUDED IN A LIQUIDATED DAMAGES CALCULATION, (D) RESULTING FROM A PARTY’S WILLFUL

MISCONDUCT, OR (E) CONSTITUTING LOST OR FOREGONE TAX CREDITS, NEITHER

PARTY SHALL BE LIABLE TO THE OTHER OR ITS INDEMNIFIED PERSONS FOR ANY

SPECIAL, PUNITIVE, EXEMPLARY, INDIRECT, OR CONSEQUENTIAL DAMAGES, OR

LOSSES OR DAMAGES FOR LOST REVENUE OR LOST PROFITS, WHETHER

FORESEEABLE OR NOT, ARISING OUT OF, OR IN CONNECTION WITH THIS AGREEMENT, BY STATUTE, IN TORT OR CONTRACT.

12.2 Waiver and Exclusion of Other Damages. EXCEPT AS EXPRESSLY SET

FORTH HEREIN, THERE IS NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR

A PARTICULAR PURPOSE, AND ANY AND ALL IMPLIED WARRANTIES ARE DISCLAIMED. THE PARTIES CONFIRM THAT THE EXPRESS REMEDIES AND

MEASURES OF DAMAGES PROVIDED IN THIS AGREEMENT SATISFY THE ESSENTIAL PURPOSES HEREOF. ALL LIMITATIONS OF LIABILITY CONTAINED IN

THIS AGREEMENT, INCLUDING, WITHOUT LIMITATION, THOSE PERTAINING TO SELLER’S LIMITATION OF LIABILITY AND THE PARTIES’ WAIVER OF

CONSEQUENTIAL DAMAGES, SHALL APPLY EVEN IF THE REMEDIES FOR BREACH OF WARRANTY PROVIDED IN THIS AGREEMENT ARE DEEMED TO “FAIL OF THEIR ESSENTIAL PURPOSE” OR ARE OTHERWISE HELD TO BE INVALID OR UNENFORCEABLE.

FOR BREACH OF ANY PROVISION FOR WHICH AN EXPRESS AND EXCLUSIVE

REMEDY OR MEASURE OF DAMAGES IS PROVIDED, SUCH EXPRESS REMEDY OR

MEASURE OF DAMAGES SHALL BE THE SOLE AND EXCLUSIVE REMEDY, THE OBLIGOR’S LIABILITY SHALL BE LIMITED AS SET FORTH IN SUCH PROVISION, AND ALL OTHER REMEDIES OR DAMAGES AT LAW OR IN EQUITY ARE WAIVED. 859
52 IF NO REMEDY OR MEASURE OF DAMAGES IS EXPRESSLY PROVIDED HEREIN, THE OBLIGOR’S LIABILITY SHALL BE LIMITED TO DIRECT DAMAGES ONLY. THE

VALUE OF ANY TAX CREDITS, DETERMINED ON AN AFTER-TAX BASIS, LOST DUE TO BUYER’S DEFAULT (WHICH SELLER HAS NOT BEEN ABLE TO MITIGATE AFTER

USE OF REASONABLE EFFORTS) AND AMOUNTS DUE IN CONNECTION WITH THE

RECAPTURE OF ANY RENEWABLE ENERGY INCENTIVES, IF ANY, SHALL BE DEEMED TO BE DIRECT DAMAGES. TO THE EXTENT ANY DAMAGES REQUIRED TO BE PAID HEREUNDER ARE LIQUIDATED, INCLUDING UNDER SECTIONS 2.2(c), 3.5,

4.3, 11.2 AND 11.3, AND AS PROVIDED IN EXHIBIT B, and EXHIBIT C, THE PARTIES

ACKNOWLEDGE THAT THE DAMAGES ARE DIFFICULT OR IMPOSSIBLE TO

DETERMINE, THAT OTHERWISE OBTAINING AN ADEQUATE REMEDY IS

INCONVENIENT, AND THAT THE LIQUIDATED DAMAGES CONSTITUTE A REASONABLE APPROXIMATION OF THE ANTICIPATED HARM OR LOSS. IT IS THE

INTENT OF THE PARTIES THAT THE LIMITATIONS HEREIN IMPOSED ON REMEDIES

AND THE MEASURE OF DAMAGES BE WITHOUT REGARD TO THE CAUSE OR

CAUSES RELATED THERETO, INCLUDING THE NEGLIGENCE OF ANY PARTY,

WHETHER SUCH NEGLIGENCE BE SOLE, JOINT OR CONCURRENT, OR ACTIVE OR PASSIVE. THE PARTIES HEREBY WAIVE ANY RIGHT TO CONTEST SUCH PAYMENTS AS AN UNREASONABLE PENALTY.

THE PARTIES ACKNOWLEDGE AND AGREE THAT MONEY DAMAGES AND THE

EXPRESS REMEDIES PROVIDED FOR HEREIN ARE AN ADEQUATE REMEDY FOR THE

BREACH BY THE OTHER OF THE TERMS OF THIS AGREEMENT, AND EACH PARTY

WAIVES ANY RIGHT IT MAY HAVE TO SPECIFIC PERFORMANCE WITH RESPECT TO ANY OBLIGATION OF THE OTHER PARTY UNDER THIS AGREEMENT.

ARTICLE 13
REPRESENTATIONS AND WARRANTIES; COVENANTS

13.1 Seller’s Representations and Warranties. As of the Effective Date, Seller represents and warrants as follows:
(a) Seller is a limited liability company, duly organized, validly existing and in good standing under the laws of the jurisdiction of its formation, and is qualified to conduct business in each jurisdiction where the failure to so qualify would have a material adverse effect on the business or financial condition of Seller.
(b) Seller has the power and authority to enter into and perform this Agreement and is not prohibited from entering into this Agreement or discharging and performing all 860
53 covenants and obligations on its part to be performed under and pursuant to this Agreement, except where such failure does not have a material adverse effect on Seller’s performance under this Agreement. The execution, delivery and performance of this Agreement by Seller has been duly authorized by all necessary limited liability company action on the part of Seller and does not and will not require the consent of any trustee or holder of any indebtedness or other obligation of Seller or any other party to any other agreement with Seller. (c) The execution and delivery of this Agreement, consummation of the transactions contemplated herein, and fulfillment of and compliance by Seller with the provisions of this Agreement will not conflict with or constitute a breach of or a default under any Law presently in effect having applicability to Seller, subject to any permits that have not yet been obtained by Seller, the documents of formation of Seller or any outstanding trust indenture, deed of trust, mortgage, loan agreement or other evidence of indebtedness or any other agreement or instrument to which Seller is a party or by which any of its property is bound. (d) This Agreement has been duly executed and delivered by Seller. This Agreement is a legal, valid and binding obligation of Seller enforceable in accordance with its terms, except as limited by laws of general applicability limiting the enforcement of creditors’ rights or by the exercise of judicial discretion in accordance with general principles of equity. (e) Neither Seller nor its Affiliates have received written notice from or been advised in writing by any existing supplier or service provider that the disease designated COVID-19 or the related virus designated SARS-CoV-2 have caused, or are reasonably likely to cause, a delay in the construction of the Facility or the delivery of materials necessary to complete the Facility, in each case that would cause the Commercial Operation Date to be later than the Guaranteed Commercial Operation Date.

13.2 Buyer’s Representations and Warranties. As of the Effective Date, Buyer represents and warrants as follows:
(a) Buyer is a joint powers authority and a validly existing community choice aggregator, duly organized, validly existing and in good standing under the laws of the State of California and the rules, regulations and orders of the California Public Utilities Commission, and is qualified to conduct business in its jurisdiction. All Persons making up the governing body of Buyer are the elected or appointed incumbents in their positions and hold their positions in good standing in accordance with the Joint Powers Agreement and other Law. (b) Buyer has the power and authority to enter into and perform this Agreement and is not prohibited from entering into this Agreement or discharging and performing all covenants and obligations on its part to be performed under and pursuant to this Agreement, except where such failure does not have a material adverse effect on Buyer’s performance under this Agreement. The execution, delivery and performance of this Agreement by Buyer has been duly authorized by all necessary action on the part of Buyer and does not and will not require the consent of any trustee or holder of any indebtedness or other obligation of Buyer or any other party to any other agreement with Buyer.
861
54 (c) The execution and delivery of this Agreement, consummation of the transactions contemplated herein, and fulfillment of and compliance by Buyer with the provisions of this Agreement will not conflict with or constitute a breach of or a default under any Law presently in effect having applicability to Buyer, including but not limited to community choice aggregation, the Joint Powers Act, competitive bidding, public notice, open meetings, election, referendum, or prior appropriation requirements, the documents of formation of Buyer or any outstanding trust indenture, deed of trust, mortgage, loan agreement or other evidence of indebtedness or any other agreement or instrument to which Buyer is a party or by which any of its property is bound.
(d) This Agreement has been duly executed and delivered by Buyer. This Agreement is a legal, valid and binding obligation of Buyer enforceable in accordance with its terms, except as limited by laws of general applicability limiting the enforcement of creditors’ rights or by the exercise of judicial discretion in accordance with general principles of equity. (e) Buyer warrants and covenants that with respect to its contractual obligations under this Agreement, it will not claim immunity on the grounds of sovereignty or similar grounds with respect to itself or its revenues or assets from (1) suit, (2) jurisdiction of court, (3) relief by way of injunction, order for specific performance or recovery of property, (4) attachment of assets, or (5) execution or enforcement of any judgment.
(f) Buyer cannot assert sovereign immunity as a defense to the enforcement of its obligations under this Agreement.
(g) Buyer is a “local public entity” as defined in Section 900.4 of the Government Code of the State of California.

13.3 General Covenants. Each Party covenants that commencing on the Effective Date and continuing throughout the Contract Term:
(a) It shall continue to be duly organized, validly existing and in good standing under the laws of the jurisdiction of its formation and to be qualified to conduct business in each jurisdiction where the failure to so qualify would have a material adverse effect on its business or financial condition;
(b) It shall maintain (or obtain from time to time as required) all regulatory authorizations necessary for it to legally perform its obligations under this Agreement; and (c) It shall perform its obligations under this Agreement in compliance with all terms and conditions in its governing documents and in material compliance with any Law.

13.4 Seller’s Covenants. Seller covenants that commencing on the Effective Date and continuing throughout the Contract Term:
(a) Compliance with Laws. To the extent applicable to Seller or the Facility, Seller shall comply with all federal, state and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any courts or administrative bodies or tribunals, including, without limitation those related to employment discrimination and prevailing wage, non-discrimination 862
55 and non-preference; conflict of interest; environmentally preferable procurement; single serving bottled water; gifts; and disqualification of former employees. Seller shall not discriminate against any employee or applicant for employment on the basis of the fact or perception of that person's race, color, religion, ancestry, national origin, age, sex (including pregnancy, childbirth or related medical conditions), legally protected medical condition, family care status, veteran status, sexual orientation, gender identity, transgender status, domestic partner status, marital status, physical or mental disability, or AIDS/HIV status.
(b) Seller shall obtain and maintain any and all permits and approvals necessary for the construction and operation of the Facility, including without limitation, environmental clearance under CEQA or other environmental law, as applicable, from the local jurisdiction where the Facility is or will be constructed.

13.5 Site Control. Seller shall maintain Site Control throughout the Delivery Term.

13.6 Prevailing Wage. Seller shall use commercially reasonable efforts to ensure that all employees hired by Seller, and its contractors and subcontractors, that will perform construction work or provide services at the Site related to construction of the Facility are paid wages at rates not less than those prevailing for workers performing similar work in the locality as provided by applicable California law, if any (“Prevailing Wage Requirement”). Nothing herein shall require Seller, its contractors and subcontractors to comply with, or assume liability created by other inapplicable provisions of any California labor laws. Buyer agrees that Seller’s obligations under this Section 13.6 will be satisfied, as one of many means or methods, upon the execution of a project labor agreement related to construction of the Facility.

13.7 Workforce Development. Seller acknowledges that Buyer will, from time to time, request voluntary disclosure of Seller’s certification status with the CPUC Clearinghouse, and voluntary disclosure regarding Seller’s efforts to work with diverse business enterprises, including women, minority, disabled veteran, and lesbian, gay, bisexual, transgender and/or persons with disabilities business enterprises in a form similar to Exhibit S.

ARTICLE 14

ASSIGNMENT

14.1 General Prohibition on Assignments. Except as provided below in this Article 14, neither Party may assign this Agreement or its rights or obligations under this Agreement, without the prior written consent of the other Party, which consent shall not be unreasonably withheld, conditioned or delayed. Seller may, without Buyer’s consent, assign this Agreement to any Person as part of a tax equity transaction or otherwise, provided that such Person must be subject to management control by the same Person(s) that had the power to control the management and policies of Seller. Any Change of Control of Seller (whether voluntary or by operation of law) will be deemed an assignment and will require the prior written consent of Buyer, which consent shall not be unreasonably withheld, conditioned or delayed; provided, a Change of Control of Seller shall not require Buyer’s consent and will not be subject to Section 14.2 or Section 14.3 if the assignee or transferee is a Permitted Transferee. Any assignment made without the required written consent, or in violation of the conditions to assignment set out below, shall be null and void. The assigning Party shall pay the other Party’s reasonable expenses associated with 863
56 the preparation, review, execution and delivery of documents in connection with any assignment of this Agreement by the assigning Party, including without limitation reasonable attorneys’ fees.

14.2 Collateral Assignment. Subject to the provisions of this Section 14.2, Seller has the right to assign this Agreement as collateral for any financing or refinancing of the Facility without the consent of Buyer. In connection with any financing or refinancing of the Facility, Buyer shall in good faith work with Seller and Lender to agree upon a consent to collateral assignment of this Agreement (“Collateral Assignment Agreement”), which shall be substantially in the form of Exhibit T. Seller shall pay Buyer’s reasonable expenses, including attorneys’ fees, incurred to provide consents, estoppels, or other required documentation in connection with Seller’s financing or refinancing of the Facility. Other than the Collateral Assignment Agreement, Buyer shall have no obligation to provide any consent, or enter into any agreement, that materially and adversely affects any of Buyer’s rights, benefits, risks or obligations under this Agreement, or to modify this Agreement.

14.3 Permitted Assignment.
(a) Seller may, without the prior written consent of Buyer, transfer or assign this Agreement directly or indirectly to an Affiliate of Seller if, and only if:
(i) Seller has given Buyer Notice at least fifteen (15) Business Days before the date of such proposed assignment; and
(ii) Seller has provided Buyer a written agreement signed by the Affiliate to which Seller wishes to assign its interests that provides that such Affiliate will assume all of Seller’s obligations and liabilities under this Agreement upon such transfer or assignment. (b) Seller may, without the prior written consent of Buyer, transfer or assign this Agreement to any Person succeeding to all, or substantially all, of the assets of Seller (whether voluntary or by operation of law), if, and only if:
(i) The assignee is a Permitted Transferee;
(ii) Seller has given Buyer Notice at least fifteen (15) Business Days before the date of such proposed assignment; and
(iii) Seller has provided Buyer a written agreement signed by the Person to which Seller wishes to assign its interests that (x) provides that such Person will assume all of Seller’s obligations and liabilities under this Agreement upon such transfer or assignment and (y) certifies that such Person meets the definition of a Permitted Transferee. (c) Notwithstanding the foregoing, any assignment by Seller, its successors or assigns under this Section 14.3 shall be of no force and effect unless and until such Notice and agreement by the assignee have been received and confirmed by Buyer.

14.4 Portfolio Financing. Buyer agrees and acknowledges that Seller may elect to finance or refinance all or any portion of the Facility or the Interconnection Facilities or the Shared Facilities (1) utilizing tax equity investment, and/or (2) through a Portfolio Financing, which may 864
57 include cross-collateralization or similar arrangements. In connection with any financing or refinancing of the Facility, the Interconnection Facilities or the Shared Facilities by Seller or any Portfolio Financing, Buyer, Seller, Portfolio Financing Entity (if any), and Lender shall execute and deliver such further consents, approvals and acknowledgments as may be reasonable and necessary to facilitate such transactions; provided, Buyer shall not be required to agree to any terms or conditions which are reasonably expected to have a material adverse effect on Buyer and all reasonable attorney’s fees incurred by Buyer in connection therewith shall be borne by Seller.

14.5 Buyer Financing Assignment. Buyer may assign this Agreement to a financing entity that will pre-pay all of Buyer’s payment obligations under this Agreement with Seller’s prior written consent, which consent shall not be unreasonably withheld, delayed or conditioned; provided that Seller has reasonably determined that the terms and conditions of such pre-payment arrangements are satisfactory to Seller and its Lenders and do not adversely affect Seller or its arrangements with Lenders in any material respect.

ARTICLE 15

DISPUTE RESOLUTION

15.1 Governing Law. This Agreement and the rights and duties of the Parties hereunder shall be governed by and construed, enforced and performed in accordance with the laws of the state of California, without regard to principles of conflicts of Law. To the extent enforceable at such time, each Party waives its respective right to any jury trial with respect to any litigation arising under or in connection with this Agreement. Subject to Section 15.2, the Parties agree that any suit, action or other legal proceeding by or against any party (or its affiliates or designees) with respect to or arising out of this Agreement shall be brought in the federal courts of the United States or the courts of the State of California sitting in the County of San Diego, California.

15.2 Dispute Resolution. In the event of any dispute arising under this Agreement, within ten (10) days following the receipt of a Notice from either Party identifying such dispute, the Parties shall meet, negotiate and attempt, in good faith, to resolve the dispute quickly and informally without significant legal costs. If the Parties are unable to resolve a dispute arising hereunder within thirty (30) days after Notice of the dispute, the Parties may pursue all remedies available to them at Law in or equity.

15.3 Attorneys’ Fees. In any proceeding brought to enforce this Agreement or because of the breach by any Party of any covenant or condition herein contained, the prevailing Party shall be entitled to reasonable attorneys’ fees (including reasonably allocated fees of in-house counsel) in addition to court costs and any and all other costs recoverable in said action.

ARTICLE 16

INDEMNIFICATION

16.1 Indemnification.
(a) Seller agrees to indemnify, defend and hold harmless Buyer and its Affiliates, directors, officers, attorneys, employees, representatives and agents (collectively, the “Buyer’s Indemnified Parties”) from and against all third-party claims, demands, losses, liabilities, penalties, and expenses (including reasonable attorneys’ fees and expert witness fees), 865
58 howsoever described, to the extent arising out of, resulting from, or caused by (i) Seller’s breach of this Agreement (including inaccuracy of any Seller representation of warranty made hereunder), (ii) a violation of applicable Laws by Seller or its Affiliates, including but not limited to violations of any laws in constructing or operating the Facility, or (iii) negligent or willful misconduct by Seller or its Affiliates, directors, officers, employees, or agents. (b) Buyer agrees to indemnify, defend and hold harmless Seller and its Affiliates, directors, officers, attorneys, employees, representatives and agents (collectively, the “Seller’s Indemnified Parties”) from and against all third-party claims, demands, losses, liabilities, penalties, and expenses (including reasonable attorneys’ fees and expert witness fees), howsoever described, to the extent arising out of, resulting from, or caused by (i) Buyer’s breach of this Agreement (including inaccuracy of any representation of warranty made hereunder), (ii) a violation of applicable Laws by Buyer or its Affiliates, or (iii) negligent or willful misconduct of Buyer or its Affiliates, its directors, officers, employees, or agents. (c) Seller shall indemnify, defend, and hold harmless Buyer’s Indemnified Parties, from any claim, liability, loss, injury or damage arising out of, or in connection with Environmental Costs and any environmental matters associated with the Facility, including the storage, disposal and transportation of Hazardous Substances, or the contamination of land, including but not limited to the Site, with any Hazardous Substances by or on behalf of the Seller or at the Seller’s direction or agreement.
(d) Nothing in this Section 16.1 shall enlarge or relieve Seller or Buyer of any liability to the other for any breach of this Agreement. Neither Party shall be indemnified for its damages resulting from its own sole negligence, intentional acts or willful misconduct. These indemnity provisions shall not be construed to relieve any insurer of its obligation to pay claims consistent with the provisions of a valid insurance policy.

16.2 Claims. Promptly after receipt by a Party of any claim or Notice of the commencement of any action, administrative, or legal proceeding, or investigation as to which an indemnity provided for in this Article 16 may apply, the Indemnified Party shall notify the Indemnifying Party in writing of such fact. The Indemnifying Party shall assume the defense thereof with counsel designated by the Indemnifying Party and satisfactory to the Indemnified Party, provided, if the defendants in any such action include both the Indemnified Party and the Indemnifying Party and the Indemnified Party shall have reasonably concluded that there may be legal defenses available to it which are different from or additional to, or inconsistent with, those available to the Indemnifying Party, the Indemnified Party shall have the right to select and be represented by separate counsel, at the Indemnifying Party’s expense for the associated reasonable legal costs and expenses, unless a liability insurer is willing to pay such costs. If the Indemnifying Party fails to assume the defense of a claim meriting indemnification, the Indemnified Party may at the expense of the Indemnifying Party contest, settle, or pay such claim; provided, settlement or full payment of any such claim may be made only following consent of the Indemnifying Party or, absent such consent, written opinion of the Indemnified Party’s counsel that such claim is meritorious or warrants settlement. Except as otherwise provided in this Article 16, in the event that a Party is obligated to indemnify and hold the other Party and its successors and assigns harmless under this Article 16, the amount owing to the Indemnified Party will be the amount of 866
59 the Indemnified Party’s damages net of any insurance proceeds received by the Indemnified Party following a reasonable effort by the Indemnified Party to obtain such insurance proceeds.

ARTICLE 17

INSURANCE

17.1 Insurance.
(a) General Liability. Seller shall maintain, or cause to be maintained at its sole expense, (i) commercial general liability insurance, including products and completed operations and personal injury insurance, in a minimum amount of per occurrence, and an annual aggregate of not less than endorsed to provide contractual liability in said amount, specifically covering Seller’s obligations under this Agreement and including Buyer as an additional insured. Defense costs shall be provided as an additional benefit and not included within the limits of liability. Such insurance shall contain standard cross-liability and severability of interest provisions. (b) Employer’s Liability Insurance. Seller, if it has employees, shall maintain Employers’ Liability insurance with limits of not less than for injury or death occurring as a result of each accident. With regard to bodily injury by disease, the policy limit will apply to each employee.
(c) Workers Compensation Insurance. Seller, if it has employees, shall also maintain at all times during the Contract Term workers’ compensation and employers’ liability insurance coverage in accordance with applicable requirements of California Law. (d) Business Auto Insurance. Seller shall maintain at all times during the Contract Term business auto insurance for bodily injury and property damage with limits of per occurrence. Such insurance shall cover liability arising out of Seller’s use of all owned (if any), non-owned and hired vehicles, including trailers or semi-trailers in the performance of the Agreement and shall name Buyer as an additional insured and contain standard cross-liability and severability of interest provisions. (e) Pollution Liability. Seller shall maintain or cause to be maintained during the construction of the Facility prior to the Commercial Operation Date, Pollution Legal Liability Insurance in the amount of per occurrence and in the aggregate, naming Seller (and Lender if any) as additional named insured. (f) Umbrella Liability Insurance. Seller shall maintain or cause to be maintained an umbrella liability policy with a limit of liability of per occurrence and in the aggregate. Such insurance shall be in excess of the General Liability, Employer’s Liability, and Business Auto Insurance coverages. Seller may choose any combination of primary, excess or umbrella liability policies to meet the insurance limits required under Sections 17.1(a), 17.1(b) and 17.1(d) above. (g) Construction All-Risk Insurance. Seller shall maintain or cause to be maintained during the construction of the Facility prior to the Commercial Operation Date, 867
60 construction all-risk form property insurance covering the Facility during such construction periods, and naming Seller (and Lender if any) as the loss payee. (h) Property Insurance. On and after the Commercial Operation Date, Seller shall maintain or cause to be maintained insurance against loss or damage from all causes under standard “all risk” property insurance coverage in amounts that are not less than the actual replacement value of the Facility; provided, however, with respect to property insurance for natural catastrophes, Seller shall maintain limits equivalent to a probable maximum loss amount determined by a firm with experience providing such determinations. Such insurance shall include business interruption coverage in an amount equal to twelve (12) months of expected revenue from this Agreement.
(i) Subcontractor Insurance. Seller shall make commercially reasonable efforts to require all of its subcontractors to carry: (i) comprehensive general liability insurance with a combined single limit of coverage not less than (ii) workers’ compensation insurance and employers’ liability coverage in accordance with applicable requirements of Law; and (iii) business auto insurance for bodily injury and property damage with limits of per occurrence. All subcontractors shall name Seller as an additional insured to insurance carried pursuant to clauses (i)(i) and (i)(iii). All subcontractors shall provide a primary endorsement and a waiver of subrogation to Seller for the required coverage pursuant to this Section 17.1(i).
(j) Evidence of Insurance. Within ten (10) days after execution of the Agreement and upon annual renewal thereafter, Seller shall deliver to Buyer certificates of insurance evidencing such coverage. To the extent commercially and reasonably available, such certificates shall specify that Buyer shall be given at least thirty (30) days prior Notice by Seller in the event of any material modification, cancellation or termination of coverage; provided that to the extent any such notices of modification are not commercially and reasonably available, Seller shall provide Buyer at least thirty (30) days prior Notice in the event of any material modification, cancellation or termination of coverage. Such insurance shall be primary coverage without right of contribution from any insurance of Buyer. Any other insurance maintained by Seller is for the exclusive benefit of Seller and shall not in any manner inure to the benefit of Buyer. The general liability, auto liability and worker’s compensation policies shall be endorsed with a waiver of subrogation in favor of Buyer for all work performed by Seller, its employees, agents and sub-contractors.

ARTICLE 18

CONFIDENTIAL INFORMATION

18.1 Definition of Confidential Information. The following constitutes “Confidential Information,” whether oral or written which is delivered by Seller to Buyer or by Buyer to Seller including: (a) the terms and conditions of, and proposals and negotiations related to, this Agreement, and (b) information that either Seller or Buyer stamps or otherwise identifies as “confidential” or “proprietary” before disclosing it to the other. Confidential Information does not include (i) information that was publicly available at the time of the disclosure, other than as a result of a disclosure in breach of this Agreement; (ii) information that becomes publicly available through no fault of the recipient after the time of the delivery; (iii) information that was rightfully 868
61 in the possession of the recipient (without confidential or proprietary restriction) at the time of delivery or that becomes available to the recipient from a source not subject to any restriction against disclosing such information to the recipient; and (iv) information that the recipient independently developed without a violation of this Agreement.

18.2 Duty to Maintain Confidentiality. The Party receiving Confidential Information (the “Receiving Party”) from the other Party (the “Disclosing Party”) shall not disclose Confidential Information to a third party (other than the Party’s members, employees, actual or potential lenders or investors, counsel, accountants, contractors, vendors, directors or advisors, or any such representatives of a Party’s Affiliates, who have a need to know such information and have agreed to keep such terms confidential) except in order to comply with any applicable Law, regulation, or any exchange, control area or independent system operator rule or in connection with any court or regulatory proceeding applicable to such Party or any of its Affiliates; provided, each Party shall, to the extent practicable, use reasonable efforts to prevent or limit the disclosure.

The Parties shall be entitled to all remedies available at law or in equity to enforce, or seek relief in connection with, this confidentiality obligation. The Parties agree and acknowledge that nothing in this Section 18.2 prohibits a Party from disclosing any one or more of the commercial terms of a transaction (other than the name of the other Party unless otherwise agreed to in writing by the Parties) to any industry price source for the purpose of aggregating and reporting such information in the form of a published energy price index.

The Parties acknowledge and agree that the Agreement and any transactions entered into in connection herewith are subject to the requirements of the California Public Records Act (Government Code Section 6250 et seq.). In order to designate information as confidential, the Disclosing Party must clearly stamp and identify the specific portion of the material designated with the word “Confidential.” The Parties agree not to over-designate material as Confidential Information. Over-designation includes stamping whole agreements, entire pages or series of pages as “Confidential” that clearly contain information that is not Confidential Information.

Upon request or demand of any third person or entity not a Party hereto to Buyer pursuant to the California Public Records Act for production, inspection and/or copying of Confidential Information (“Requested Confidential Information”), Buyer shall as soon as practical notify Seller in writing via email that such request has been made. Seller shall be solely responsible for taking at its sole expense whatever legal steps are necessary to prevent release of the Requested Confidential Information to the third party by Buyer. If Seller takes no such action after receiving the foregoing notice from Buyer, Buyer shall, at its discretion, be permitted to comply with the third party’s request or demand and is not required to defend against it. If Seller does take or attempt to take such action, Buyer shall provide timely and reasonable cooperation to Seller, if requested by Seller, and Seller agrees to indemnify and hold harmless Buyer and Buyer’s Indemnified Parties from any claims, liability, award of attorneys’ fees, or damages, and to defend any action, claim or lawsuit brought against any of Buyer or Buyer’s Indemnified Parties for Buyer’s refusal to disclose any Requested Confidential Information.

18.3 Irreparable Injury; Remedies. Receiving Party acknowledges that its obligations hereunder are necessary and reasonable in order to protect Disclosing Party and the business of Disclosing Party, and expressly acknowledges that monetary damages would be inadequate to compensate Disclosing Party for any breach or threatened breach by Receiving Party of any 869
62 covenants and agreements set forth herein. Accordingly, Receiving Party acknowledges that any such breach or threatened breach will cause irreparable injury to Disclosing Party and that, in addition to any other remedies that may be available, in law, in equity or otherwise, Disclosing Party will be entitled to obtain injunctive relief against the threatened breach of this Agreement or the continuation of any such breach, without the necessity of proving actual damages.

18.4 Further Permitted Disclosure. Notwithstanding anything to the contrary in this Article 18, Confidential Information may be disclosed by the Receiving Party to any of its agents, consultants, contractors, trustees, or actual or potential financing parties (including, in the case of Seller, its Lender(s)) or investors or purchasers (including tax credit buyers), so long as such Person to whom Confidential Information is disclosed agrees in writing to be bound by confidentiality provisions that are at least as restrictive as this Article 18 to the same extent as if it were a Party.

18.5 Press Releases. Neither Party shall issue (or cause its Affiliates to issue) a press release regarding the transactions contemplated by this Agreement unless both Parties have agreed upon the contents of any such press release. A Party’s consent shall not be unreasonably withheld, conditioned or delayed.

ARTICLE 19

MISCELLANEOUS

19.1 Entire Agreement; Integration; Exhibits. This Agreement, together with the Cover Sheet and Exhibits attached hereto constitutes the entire agreement and understanding between Seller and Buyer with respect to the subject matter hereof and supersedes all prior agreements relating to the subject matter hereof, which are of no further force or effect. The Exhibits attached hereto are integral parts hereof and are made a part of this Agreement by reference. The headings used herein are for convenience and reference purposes only. In the event of a conflict between the provisions of this Agreement and those of the Cover Sheet or any Exhibit, the provisions of first the Cover Sheet, and then this Agreement shall prevail, and such Exhibit shall be corrected accordingly. This Agreement shall be considered for all purposes as prepared through the joint efforts of the Parties and shall not be construed against one Party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution hereof.

19.2 Amendments. Except as otherwise explicitly permitted herein, this Agreement may only be amended, modified or supplemented by an instrument in writing executed by duly authorized representatives of Seller and Buyer; provided, this Agreement may not be amended by electronic mail communications.

19.3 No Waiver. Waiver by a Party of any default by the other Party shall not be construed as a waiver of any other default.

19.4 No Agency, Partnership, Joint Venture or Lease. Seller and the agents and employees of Seller shall, in the performance of this Agreement, act in an independent capacity and not as officers or employees or agents of Buyer. Under this Agreement, Seller and Buyer intend to act as energy seller and energy purchaser, respectively, and do not intend to be treated 870
63 as, and shall not act as, partners in, co-venturers in or lessor/lessee with respect to the Facility or any business related to the Facility. This Agreement shall not impart any rights enforceable by any third party (other than a permitted successor or assignee bound to this Agreement) and/or, to the extent set forth herein or in any Collateral Assignment Agreement, any Lender and/or Indemnified Party.

19.5 Severability. In the event that any provision of this Agreement is unenforceable or held to be unenforceable, the Parties agree that all other provisions of this Agreement have force and effect and shall not be affected thereby. The Parties shall, however, use their best endeavors to agree on the replacement of the void, illegal or unenforceable provision(s) with legally acceptable clauses which correspond as closely as possible to the sense and purpose of the affected provision and this Agreement as a whole.

19.6 Mobile-Sierra. Notwithstanding any other provision of this Agreement, neither Party shall seek, nor shall they support any third party seeking, to prospectively or retroactively revise the rates, terms or conditions of service of this Agreement through application or complaint to FERC pursuant to the provisions of Section 205, 206 or 306 of the Federal Power Act, or any other provisions of the Federal Power Act, absent prior written agreement of the Parties. Further, absent the prior written agreement in writing by both Parties, the standard of review for changes to the rates, terms or conditions of service of this Agreement proposed by a Party shall be the “public interest” standard of review set forth in United Gas Pipe Line Co. v. Mobile Gas Service Corp., 350 U.S. 332 (1956) and Federal Power Commission v. Sierra Pacific Power Co., 350 U.S. 348 (1956). Changes proposed by a non-Party or FERC acting sua sponte shall be subject to the most stringent standard permissible under applicable Law.

19.7 Counterparts. This Agreement may be executed in one or more counterparts, all of which taken together shall constitute one and the same instrument and each of which shall be deemed an original.

19.8 Electronic Delivery. This Agreement may be duly executed and delivered by a Party by electronic format (including portable document format (.pdf)). Delivery of an executed counterpart in .pdf electronic version shall be binding as if delivered in the original. The words “execution,” “signed,” “signature,” and words of like import in this Agreement shall be deemed to include electronic signatures or electronic records, each of which shall be of the same legal effect, validity, or enforceability as a manually executed signature or the use of a paper-based record keeping system, as the case may be, to the extent and as provided for in any applicable law.

19.9 Binding Effect. This Agreement shall inure to the benefit of and be binding upon the Parties and their respective successors and permitted assigns.

19.10 No Recourse to Members of Buyer. Buyer is organized as a Joint Powers Authority in accordance with the Joint Exercise of Powers Act of the State of California (Government Code Section 6500, et seq.) pursuant to its Joint Powers Agreement and is a public entity separate from its constituent members. Each Party shall solely be responsible for all its debts, obligations and liabilities accruing and arising out of this Agreement, and neither Party shall have any rights and shall not make any claims, take any actions or assert any remedies against the other 871
64 Party’s constituent members, or the officers, directors, advisors, contractors, consultants or employees of the other Party, in connection with this Agreement.

19.11 Forward Contract. The Parties acknowledge and agree that this Agreement constitutes a “forward contract” within the meaning of the U.S. Bankruptcy Code, and Buyer and Seller are “forward contract merchants” within the meaning of the U.S. Bankruptcy Code. Each Party further agrees that, for all purposes of this Agreement, each Party waives and agrees not to assert the applicability of the provisions of 11 U.S.C. § 366 in any Bankruptcy proceeding wherein such Party is a debtor. In any such proceeding, each Party further waives the right to assert that the other Party is a provider of last resort to the extent such term relates to 11 U.S.C. §366 or another provision of 11 U.S.C. § 101-1532.

19.12 Change in Electric Market Design. If a change in the CAISO Tariff renders this Agreement or any provisions hereof incapable of being performed or administered, then any Party may request that Buyer and Seller enter into negotiations to make the minimum changes to this Agreement necessary to make this Agreement capable of being performed and administered, while attempting to preserve to the maximum extent possible the benefits, burdens, and obligations set forth in this Agreement as of the Effective Date. Upon delivery of such a request, Buyer and Seller shall engage in such negotiations in good faith. If Buyer and Seller are unable, within sixty (60) days after delivery of such request, to agree upon changes to this Agreement or to resolve issues relating to changes to this Agreement, then any Party may submit issues pertaining to changes to this Agreement to the dispute resolution process set forth in Article 15. Notwithstanding the foregoing, (i) a change in cost shall not in and of itself be deemed to render this Agreement or any of the provisions hereof incapable of being performed or administered, and (ii) all of the unaffected provisions of this Agreement shall remain in full force and effect during any period of such negotiation or dispute resolution.

19.13 Further Assurances. Each of the Parties hereto agrees to provide such information, execute and deliver any instruments and documents and to take such other actions as may be necessary or reasonably requested by the other Party which are not inconsistent with the provisions of this Agreement and which do not involve the assumption of obligations other than those provided for in this Agreement, to give full effect to this Agreement and to carry out the intent of this Agreement.
[Signatures on following page]
872
Signature Page
IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed as of the Effective Date.

NORTH JOHNSON ENERGY CENTER,
LLC
By:

Name:

Title:

SAN DIEGO COMMUNITY POWER
By:

Name:

Title:

873

Exhibit A - 1

EXHIBIT A

FACILITY DESCRIPTION
Site Name: North Johnson Energy Center
Site includes all or some of the following APNs:

County: San Diego County
CEQA Lead Agency: City of El Cajon
Zip Code: 92020
Latitude and Longitude:

Facility Description: Battery Energy Storage Projected rated at 50 MW & 200 MWh Interconnection Point: El Cajon 69/12kV Substation
Facility Meter: See Exhibit R
Facility Metering Points: See Exhibit R
P-node: ELCAJN_6_LM6K (Proxy until assigned by CAISO)
Transmission Provider: PTO = SDG&E
Additional Information: Site Plan provided below.
874

Exhibit B - 1

EXHIBIT B

FACILITY CONSTRUCTION AND COMMERCIAL OPERATION

1. Construction of the Facility.
a. “Construction Start” will occur upon Seller’s acquisition of all applicable regulatory authorizations, approvals and permits necessary to commence construction of the Facility, and once Seller has engaged all contractors and ordered all essential equipment and supplies as, in each case, can reasonably be considered necessary so that physical construction of the Facility may begin and proceed to completion without foreseeable interruption of material duration, and has executed an engineering, procurement, and construction contract (or similar contract) and issued thereunder a notice to proceed that authorizes the contractor to mobilize to Site and begin physical construction (including, at a minimum, excavation for foundations or the installation or erection of improvements) at the Site. The date of Construction Start will be evidenced by and subject to Seller’s delivery to Buyer of a certificate substantially in the form attached as Exhibit J hereto, and the date certified therein shall be the “Construction Start Date.” Seller shall cause Construction Start to occur no later than the Guaranteed Construction Start Date, as may be extended by Seller’s payment of Daily Delay Damages pursuant to Section 1(b) of this Exhibit B and/or a Development Cure Period pursuant to Section 4 of this Exhibit B.
b. In addition to extensions pursuant to a Development Cure Period, Seller may extend the Guaranteed Construction Start Date by paying Daily Delay Damages in advance to Buyer for each day Seller desires to extend the Guaranteed Construction Start Date, not to exceed of extensions by such payment of
Daily Delay Damages. If Seller elects to extend the Guaranteed Construction Start Date, on or before the date that is ten (10) days prior to the then-current (including any previous extensions) Guaranteed Construction Start Date, Seller shall provide notice and payment to Buyer of the Daily Delay Damages for the number of days of extension to the Guaranteed Construction Start Date. If Seller achieves Construction Start prior to the Guaranteed Construction Start Date, as extended by the payment of Daily Delay Damages, Buyer shall refund to Seller the Daily Delay Damages for each day Seller achieves Construction Start prior to the Guaranteed Construction Start Date times the Daily Delay Damages, not to exceed the total amount of Daily Delay Damages paid by Seller pursuant to this Section 1(b) of Exhibit B. If Seller achieves Commercial Operation on or before the Guaranteed Commercial Operation Date (not including any extensions to such date resulting from Seller’s payment of Commercial Operation Delay Damages, but as may be extended pursuant to a Development Cure Period), then Buyer shall refund to Seller all Daily Delay Damages paid by Seller and not previously refunded by Buyer.

2. Commercial Operation of the Facility. “Commercial Operation” means the condition existing when (i) Seller has fulfilled all of the conditions precedent in Section 2.3 of the 875

Exhibit B - 2
Agreement and provided Notice to Buyer substantially in the form of Exhibit H (the “COD Certificate”) (ii) Seller has notified Buyer in writing that it has provided the required documentation to Buyer and met the conditions for achieving Commercial Operation, and (iii) Buyer has acknowledged to Seller in writing that Buyer agrees that Commercial Operation has been achieved, which acknowledgement shall not be unreasonably withheld, conditioned or delayed. The “Commercial Operation Date” shall be the date on which Commercial Operation is achieved.
b. Seller shall cause Commercial Operation to occur no later than the Guaranteed Commercial Operation Date, as such date may be adjusted pursuant to Section 2(a) of this Exhibit B, and extended by Seller’s payment of Commercial Operation Delay Damages pursuant to Section 2(c) of this Exhibit B and/or a Development Cure Period pursuant to Section 4 of this Exhibit B. Seller shall notify Buyer at least sixty (60) days before the anticipated Commercial Operation Date. c. In addition to extensions pursuant to a Development Cure Period, Seller may extend the Guaranteed Commercial Operation Date by paying Commercial Operation Delay Damages in advance to Buyer for each day Seller desires to extend the Guaranteed Commercial Operation Date, not to exceed
by such payment of Commercial Operation Delay
Damages. If Seller elects to extend the Guaranteed Commercial Operation Date, on or before the date that is ten (10) days prior to the then-current Guaranteed Commercial Operation Date, Seller may provide Notice and payment to Buyer of the Commercial Operation Delay Damages for the number of days of extension to the Guaranteed Commercial Operation Date. If Seller achieves Commercial Operation prior to the Guaranteed Commercial Operation Date, as extended by the payment of Commercial Operation Delay Damages, Buyer shall refund to Seller the Commercial Operation Delay Damages for each day Seller achieves Commercial Operation prior to the Guaranteed Commercial Operation Date times the Commercial Operation Delay Damages, not to exceed the total amount of Commercial Operation Delay Damages paid by Seller pursuant to this Section 2(b) of Exhibit B.

3. Termination for Failure to Timely Achieve Construction Start and/or Commercial Operation. If the Facility has not achieved Construction Start on or before the Guaranteed Construction Start Date (as may be extended hereunder), Buyer may elect to terminate this Agreement in accordance with Sections 11.1(b)(ii) and 11.2. If the Facility has not 876

Exhibit B - 3
achieved Commercial Operation on or before the Guaranteed Commercial Operation Date (as may be extended hereunder), Buyer may elect to terminate this Agreement in accordance with Sections 11.1(b)(ii) and 11.2.

4. Extension of the Guaranteed Dates. The Guaranteed Construction Start Date and the Guaranteed Commercial Operation Date shall, subject to notice and documentation requirements set forth below, both be automatically extended on a day-for-day basis (the “Development Cure Period”) for the duration of any and all delays arising out any of the following circumstances to the extent the following circumstances are not the result of Seller’s failure to take all commercially reasonable actions to meet its requirements and deadlines:
a. a Force Majeure Event occurs; or
b. the Interconnection Facilities or Reliability Network Upgrades are not complete and ready for the Facility to connect and sell Product at the Delivery Point by the Guaranteed Commercial Operation Date despite the exercise of diligent and commercially reasonable efforts by Seller (an “Interconnection Delay”); or c. Buyer or the Facility SC has not made all necessary arrangements to receive the Product at the Delivery Point by the Guaranteed Commercial Operation Date or Buyer has otherwise breached it obligation(s) under this Agreement and such breach causes a delay in the COD.
877

Exhibit B - 4
878

EXHIBIT C
879
Exhibit C - 2
880
Exhibit D - 1

EXHIBIT D

SCHEDULING COORDINATOR RESPONSIBILITIES
(a) Election of SC. As of the Effective Date, Buyer hereby (i) selects Seller to be responsible for the provision of Scheduling Coordinator Services and (ii) consents to allowing Wellhead Power Exchange, LLC (“WPX”) to be the Scheduling Coordinator for the Facility for both the delivery and the receipt (as applicable) of Charging Energy, Discharging Energy and the Product at the Delivery Point. Commencing on the Commercial Operation Date, Buyer will pay Seller $10,000 per month in arrears for Scheduling Coordinator Services for each month WPX remains the Facility SC. Such services will include, but not be limited to, bid optimization to maximize Buyer revenues in coordination with and subject to approval by Buyer, subject to the Operating Restrictions and the CAISO Tariff. The Parties shall enter into good faith negotiations to agree on necessary amendments to this Agreement, if any, to effectuate the selection of Seller as responsible for Scheduling Coordinator Services and WPX as the Facility SC so long as such amendment will not require approval by Buyer’s board of directors. Such negotiations shall be limited to necessary amendments related to the Scheduling Coordinator Services for the Facility and shall, to the greatest extent possible, maintain the relative benefits, burdens, and obligations under this Agreement. Buyer shall have the right to revoke its selection of Seller as the responsible Party for Scheduling Coordinator Services and remove WPX as the Facility SC at any time and at Buyer’s sole discretion, (1) if WPX fails, in the sole opinion of Buyer, to adequately perform the Scheduling Coordinator Services, or (2) if Buyer elects to revoke the selection for any cost related reasons. Such revocation will become effective [sixty (60) days] after Buyer provides notice to Seller of its revocation pursuant to this clause (a) (the “Change in SC Effective Date”). If such a revocation occurs, Buyer or Buyer’s agent will become the Facility SC. (b) Buyer as Scheduling Coordinator for the Facility. If pursuant to clause (a) immediately above, Buyer elects to be the Facility SC or designates a qualified third party to provide Scheduling Coordinator Services with the CAISO for the Facility at least thirty (30) days prior to the Change in SC Effective Date, (i) Seller shall take all commercially reasonable actions and execute and deliver to Buyer and the CAISO all documents in Seller’s control and responsibility which are necessary to authorize or designate Buyer (or Buyer’s designee) as the Scheduling Coordinator for the Facility effective as of the Change in SC Effective Date, and (ii) Buyer shall, and shall cause its designee to, expeditiously take all actions and execute and deliver to Seller and the CAISO all documents necessary to authorize or designate Buyer or its designee as the Scheduling Coordinator for the Facility effective as of the Change in SC Effective Date through the termination or expiration of the Delivery Term. On or after the Change in SC Effective Date, Seller shall not authorize or designate any other party to act as the Facility’s Scheduling Coordinator, nor shall Seller perform for its own benefit the duties of Scheduling Coordinator, and Seller shall not revoke Buyer’s authorization to act as the Facility’s Scheduling Coordinator unless agreed to by Buyer. From and after the Change in SC Effective Date, the Facility SC shall provide Seller with access to a web-based system through which Seller shall submit to Buyer and the CAISO all notices and updates required under the CAISO Tariff regarding the Facility’s status, including, but not limited to, all outage requests, forced outages, forced outage reports, clearance requests, or must offer waiver forms. Seller shall cooperate with Buyer to provide such notices and updates. If the web-based system is not available, Seller shall promptly submit such information 881
Exhibit D - 2
to Buyer and the CAISO (in order of preference) telephonically, by electronic mail, or transmission to the personnel designated to receive such information. (c) Scheduling Coordinator Services. The Facility SC shall submit Schedules to the CAISO in accordance with this Agreement and the applicable CAISO Tariff, protocols and Scheduling practices for Product on a day-ahead, hour-ahead, fifteen-minute market, real time or other CAISO market basis that may develop after the Effective Date, as determined by Buyer (the “Scheduling Coordinator Services”).
(d) CAISO Costs and Revenues. Buyer shall be responsible for CAISO costs, charges and penalties (including Buyer Charging Energy, penalties, Imbalance Energy costs or revenues when related to Buyer Charging Energy or Buyer Discharging Energy, and other charges) that do not result from Seller exercising Seller’s Dispatch Rights and shall be entitled to all CAISO revenues (including Buyer Discharging Energy, credits, Imbalance Energy revenues or costs when related to Buyer Charging Energy or Buyer Discharging Energy, and other payments) that do not result from Seller exercising Seller’s Dispatch Rights, including revenues associated with CAISO dispatches, bid cost recovery, Inter-SC Trade credits, or other credits in respect of the Product Scheduled or delivered from the Delivery Point and Buyer Charging Energy delivered to the Delivery Point; provided, however, Seller shall assume all liability and reimburse Buyer for any and all CAISO penalties (i) incurred by Buyer resulting from any failure by Seller to abide by the CAISO Tariff requirements imposed on it as Facility owner (but not in connection with obligations of Buyer hereunder) or the outage notification requirements set forth in this Agreement (except to the extent such non-compliance is caused by Buyer’s failure to perform its duties as Scheduling Coordinator for the Facility, if Buyer or Buyer’s agent is the Facility SC), (ii) to the extent arising as a result of Seller’s failure to comply with a timely Curtailment Order if such failure results in incremental costs to Buyer, or (iii) resulting from Seller exercising Seller’s Dispatch Rights. The Parties agree that any Availability Incentive Payments (as defined in the CAISO Tariff) are for the benefit of Seller and for Seller’s account and that any Non-Availability Charges (as defined in the CAISO Tariff) are the responsibility of Seller and for Seller’s account (except to the extent such Non-Availability Charges arise out of Buyer’s failure to perform its duties as Scheduling Coordinator for the Facility, if Buyer or Buyer’s agent is the Facility SC). In addition, if during the Delivery Term, the CAISO implements or has implemented any sanction or penalty related to scheduling, outage reporting, or generator operation, and any such sanctions or penalties are imposed upon the Facility or to Buyer as Scheduling Coordinator due to failure by Seller to abide by the CAISO Tariff or the outage notification requirements set forth in this Agreement, the cost of the sanctions or penalties shall be Seller’s responsibility. (e) CAISO Settlements. The Facility SC shall be responsible for all settlement functions with the CAISO related to the Facility. The Facility SC shall render a separate invoice to each of Seller and Buyer for any CAISO payments, charges or penalties (“CAISO Charges Invoice”) for which such Party is responsible under this Agreement. CAISO Charges Invoices shall be rendered after settlement information becomes available from the CAISO that identifies any CAISO charges. Notwithstanding the foregoing, each Party acknowledges that the CAISO will issue additional invoices reflecting CAISO adjustments to such CAISO charges. The Facility SC shall review, validate, and if requested by a Party under clause (f) below, dispute any charges that are the responsibility of such Party in a timely manner and consistent with the Facility SC’s existing settlement processes for charges. Subject to each Party’s right to dispute and to have the 882
Exhibit D - 3
Facility SC pursue the dispute of any such invoices, the disputing Party shall pay the amount of CAISO Charges Invoices within ten (10) Business Days of such Party’s receipt of the CAISO Charges Invoice. If a Party fails to pay such CAISO Charges Invoice within that period, the Facility SC may net or offset any amounts owing to it for such CAISO Charges Invoices against any future amounts it may owe to the other Party under this Agreement. The obligations under this Section with respect to payment of CAISO Charges Invoices in respect of performance prior to the expiration or termination of this Agreement shall survive the expiration or termination of this Agreement.
(f) Dispute Costs. The Facility SC may be required by either Party to dispute CAISO settlements in respect of the Facility. Such Party agrees to pay the Facility SC’s costs and expenses (including reasonable attorneys’ fees) associated with its involvement with such CAISO disputes to the extent they relate to CAISO charges payable by the disputing Party with respect to the Facility that the disputing Party has directed the Facility SC to dispute, except to the extent such dispute arises from the Facility Party’s failure to perform its duties as Scheduling Coordinator for the Facility.
(g) Terminating Buyer’s Designation as Scheduling Coordinator. If Buyer or its agent is the Facility SC, at least thirty (30) days prior to expiration of this Agreement or as soon as reasonably practicable upon an earlier termination of this Agreement, the Parties will take all actions necessary to terminate the designation of Buyer or its agent as Scheduling Coordinator for the Facility as of 11:59 p.m. on such expiration date.
(h) Master Data File and Resource Data Template. Seller shall provide the data to the CAISO (and to Buyer) that is required for the CAISO’s Master Data File and Resource Data Template (or successor data systems) for the Facility consistent with this Agreement. Neither Party shall change such data without the other Party’s prior written consent. (i) NERC Reliability Standards. If Buyer is the Facility SC, Buyer shall cooperate reasonably with Seller, or cause its designated Scheduling Coordinator to cooperate reasonably with Seller, to the extent necessary to enable Seller to comply, and for Seller to demonstrate Seller’s compliance with, NERC reliability standards. This cooperation shall include the provision of information in Buyer’s possession or its designated SC’s possession, and if applicable, that Buyer (as the Facility SC) or its designated Scheduling Coordinator, as applicable, has provided to the CAISO related to the Facility or actions taken by Buyer (as Facility SC) or its designated Scheduling Coordinator, as applicable, related to Seller’s compliance with applicable NERC reliability standards.
883
Exhibit E - 1

EXHIBIT E

PROGRESS REPORTING FORM
Each Progress Report must include the following items:

1. Executive Summary.

2. Facility description.

3. Site plan of the Facility.

4. Description of any material planned changes to the Facility or the Site.

5. Gantt chart schedule showing progress on achieving each of the Milestones.

6. Summary of activities during the previous calendar quarter or month, as applicable, including any OSHA incidents.

7. Forecast of activities scheduled for the current calendar quarter.

8. Written description about the progress relative to Seller’s Milestones, including whether Seller has met or is on target to meet the Milestones.

9. List of issues that are reasonably likely to affect Seller’s Milestones.

10. A status report of start-up activities including a forecast of activities ongoing and after start-up, a report on Facility performance including performance projections for the next twelve (12) months.

11. Prevailing wage reports as required by Law.

12. Progress and schedule of all material agreements, contracts, permits, approvals, financing agreements and major equipment purchase orders showing the projected and completion dates.

13. Pictures, in sufficient quantity and of appropriate detail, in order to document construction and startup progress of the Facility, the interconnection into the Transmission System and all other interconnection utility services.

14. Workforce Development or Supplier Diversity Reporting (if applicable). Format to be provided by Buyer.

15. Any other documentation reasonably requested by Buyer. 884
Exhibit F - 1

EXHIBIT F

FORM OF MONTHLY EXPECTED AVAILABLE CAPACITY REPORT
[Available Capacity, MW Per Hour] – [Insert Month]
1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24:00 Day 1
Day 2
Day 3
Day 4
Day 5
[insert additional rows for each day in the month]
Day
29 Day
30 Day
31 The foregoing table is provided for informational purposes only, and it shall not constitute, or be deemed to constitute, an obligation of any of the Parties to this Agreement.
885
Exhibit G - 1

EXHIBIT G

FORM OF DAILY AVAILABILITY NOTICE
Trading Day:

Station: Issued By:

Unit: Issued At:

Unit 100% Available No Restrictions:

Hour Ending Available Capacity Comments
(MW)
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
12:00
13:00
14:00
15:00
16:00
17:00
18:00
19:00
20:00
21:00
22:00
23:00
0:00
Comments:
886
Exhibit H - 1

EXHIBIT H

FORM OF COMMERCIAL OPERATION DATE CERTIFICATE
This certification (“Certification”) of Commercial Operation is delivered by _______ [licensed professional engineer] (“Engineer”) to San Diego Community Power, a California joint powers authority (“Buyer”) in accordance with the terms of that certain Energy Storage Service Agreement dated _______ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement.

As of _______[DATE]_____, Engineer hereby certifies and represents to Buyer the following:

1. The Facility is fully operational, interconnected, and synchronized with the Transmission System in accordance with the Interconnection Agreement.

2. The Facility has met all Interconnection Agreement requirements and is capable of receiving Charging Energy from, and delivering Discharging Energy to, the CAISO Balancing Authority.

3. The commissioning of the equipment has been completed in accordance with the applicable material requirements of the manufacturers’ specifications.

4. The Facility’s Installed Capacity is no less than ninety-five percent (95%) of the Guaranteed Capacity and the Facility is capable of charging, storing and discharging Energy, all within the operational constraints and subject to the applicable Operating Restrictions.

5. Authorization to parallel the Facility was obtained by the Transmission Provider, [Name of Transmission Provider as appropriate] on___[DATE]____.

6. The Transmission Provider has provided documentation supporting full unrestricted release for Commercial Operation by [Name of Transmission Provider as appropriate] on _______[DATE]_____.

7. The CAISO has provided notification supporting Commercial Operation, in accordance with the CAISO Tariff on _______[DATE]_____.

8. Seller has segregated and separately metered Station Use to the extent required in accordance with the retail service provider’s tariff, and any such meter(s) have the same or greater level of accuracy as is required under the retail service provider’s tariff.

EXECUTED by [LICENSED PROFESSIONAL ENGINEER]
this ________ day of _____________, 20__.
[LICENSED PROFESSIONAL ENGINEER]
By:

Its:

Date:
887
Exhibit I - 1

EXHIBIT I

FORM OF CAPACITY AND EFFICIENCY RATE TEST CERTIFICATE
This certification (“Certification”) of Capacity and Efficiency Rate Test results is delivered by [licensed professional engineer] (“Engineer”) to San Diego Community Power, a California joint powers authority (“Buyer”) in accordance with the terms of that certain Energy Storage Service Agreement dated __________ (“Agreement”) by and between [SELLER ENTITY] and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement.

I hereby certify that a Capacity Test conducted on [Date] demonstrated (i) an [Installed or Effective] Capacity of __ MW AC to the Delivery Point at four (4) hours of continuous discharge, (ii) a Battery Charging Factor of __%, (iii) a Battery Discharging Factor of __%, and (iv) an Efficiency Rate of __%, all in accordance with the testing procedures, requirements and protocols set forth in Section 4.4 and Exhibit O.

EXECUTED by [LICENSED PROFESSIONAL ENGINEER]
this ________ day of _____________, 20__.
[LICENSED PROFESSIONAL ENGINEER]
By:

Its:

Date:
888

Exhibit J - 1

EXHIBIT J

FORM OF CONSTRUCTION START DATE CERTIFICATE
This certification of Construction Start Date (“Certification”) is delivered by [SELLER ENTITY] (“Seller”) to San Diego Community Power, a California joint powers authority (“Buyer”) in accordance with the terms of that certain Energy Storage Service Agreement dated __________ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Certification but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement.

Seller hereby certifies and represents to Buyer the following:
(1) Construction Start (as defined in Exhibit B of the Agreement) has occurred, and a copy of the notice to proceed that Seller issued to its contractor as part of Construction Start is attached hereto.
(2) the Construction Start Date occurred on _____________ (the “Construction Start Date”); and
(3) the precise Site on which the Facility is located is, which must be within the boundaries of the previously identified Site:
_____________________________________________________________________ (such description shall amend the description of the Site in Exhibit A of the Agreement.) IN WITNESS WHEREOF, the undersigned has executed this Certification on behalf of Seller as of the ___ day of ________.
[SELLER ENTITY]
By:

Its:

Date:
889

Exhibit K - 1

EXHIBIT K
Form of Letter of Credit

IRREVOCABLE NON-TRANSFERABLE STANDBY LETTER OF CREDIT
LETTER OF CREDIT NUMBER: []
ISSUANCE DATE: []
EXPIRATION DATE: []
PLACE OF EXPIRY: []
ISSUING BANK:
[•]
BENEFICIARY:
[•]
APPLICANT:
[•]
AVAILABLE AMOUNT: USD [•] (UNITED STATES DOLLARS [•])
LADIES AND GENTLEMEN:

WE, [•], [•], (THE "BANK") HEREBY ESTABLISHES THIS IRREVOCABLE NON-TRANSFERABLE STANDBY LETTER OF CREDIT NO. [] ("LETTER OF CREDIT") IN FAVOR OF [•] (THE "BENEFICIARY"), FOR THE ACCOUNT OF [•], A [] LIMITED LIABILITY CORPORATION (THE "APPLICANT"), FOR THE AMOUNT STATED ABOVE (THE "AVAILABLE AMOUNT"), EFFECTIVE IMMEDIATELY.

THIS LETTER OF CREDIT SHALL BE OF NO FURTHER FORCE OR EFFECT AT 5:00 P.M.,

NEW YORK TIME ON THE EXPIRATION DATE STATED ABOVE OR, IF SUCH DAY IS

NOT A BUSINESS DAY (AS HEREINAFTER DEFINED), ON THE NEXT BUSINESS DAY (AS MAY BE EXTENDED PURSUANT TO THE TERMS OF THIS LETTER OF CREDIT) (THE "EXPIRATION DATE").

FOR THE PURPOSE HEREOF, "BUSINESS DAY" SHALL MEAN ANY DAY OTHER THAN:

1. A SATURDAY OR A SUNDAY,

2. A DAY ON WHICH BANKING INSTITUTIONS IN THE STATE OF NEW YORK ARE

REQUIRED OR AUTHORIZED BY LAW TO REMAIN CLOSED, OR
890
Exhibit K - 2

3. A DAY ON WHICH THE PAYMENT SYSTEM OF THE FEDERAL RESERVE SYSTEM IS NOT OPERATIONAL.

IT IS A CONDITION OF THIS LETTER OF CREDIT THAT THE EXPIRATION DATE SHALL BE AUTOMATICALLY EXTENDED, WITHOUT AMENDMENT, FOR ONE (1)

YEAR FROM THE EXPIRATION DATE HEREOF OR ANY FUTURE EXPIRATION DATE, UNLESS AT LEAST SIXTY (60) DAYS PRIOR TO SUCH EXPIRATION DATE, THE BANK

HAS SENT BENEFICIARY WRITTEN NOTICE BY CERTIFIED MAIL OR OVERNIGHT

COURIER, AT THE ADDRESS STATED BELOW, THAT THE BANK ELECTS NOT TO EXTEND THIS LETTER OF CREDIT FOR ANY SUCH ADDITIONAL PERIOD. NO

PRESENTATION MADE UNDER THIS LETTER OF CREDIT AFTER SUCH EXPIRATION DATE WILL BE HONORED.

SUBJECT TO THE TERMS AND CONDITIONS HEREIN, FUNDS UNDER THIS LETTER

OF CREDIT ARE AVAILABLE TO BENEFICIARY BY COMPLYING PRESENTATION ON OR BEFORE 5:00 P.M. NEW YORK TIME, ON OR BEFORE THE THEN CURRENT EXPIRATION DATE OF THE FOLLOWING:

1. THE ORIGINAL OF THIS LETTER OF CREDIT AND ALL AMENDMENTS, OR A COPY

OF SUCH DOCUMENTS IN THE CASE OF PARTIAL DRAWINGS,

2. A DRAWING CERTIFICATE ISSUED IN THE FORM OF ATTACHMENT "A"

ATTACHED HERETO AND WHICH FORMS AN INTEGRAL PART HEREOF, DULY

COMPLETED AND BEARING THE SIGNATURE OF AN AUTHORIZED

REPRESENTATIVE OF THE BENEFICIARY SIGNING AS SUCH, AND

3. A SIGHT DRAFT IN THE FORM OF ATTACHMENT "B" ATTACHED HERETO AND

WHICH FORMS AN INTEGRAL PART HEREOF, DULY COMPLETED AND BEARING THE SIGNATURE OF AN AUTHORIZED REPRESENTATIVE OF THE BENEFICIARY.

DRAWINGS MAY ALSO BE PRESENTED AS A PDF ATTACHMENT TO AN EMAIL TO [BANK EMAIL ADDRESS] OR BY FACSIMILE TRANSMISSION ("FAX") TO FAX NUMBER [] OR SUCH OTHER NUMBER AS SPECIFIED FROM TIME-TO-TIME BY THE

BANK WITH TELEPHONE CONFIRMATION BY THE BENEFICIARY TO THE BANK AT [] OR [], OR SUCH OTHER NUMBERS AS SPECIFIED FROM TIME-TO-TIME BY THE BANK. BENEFICIARY'S FAILURE TO SEEK SUCH A TELEPHONE CONFIRMATION DOES NOT AFFECT THE BANK'S OBLIGATION TO HONOR SUCH A PRESENTATION.

THE EMAIL OR FACSIMILE TRANSMITTAL SHALL BE DEEMED DELIVERED WHEN RECEIVED. IT IS UNDERSTOOD THAT ANY SUCH FAX PRESENTATION SHALL BE CONSIDERED THE SOLE OPERATIVE INSTRUMENT OF DRAWING. IN THE EVENT OF

PRESENTATION BY EMAIL OR FAX, THE ORIGINAL DOCUMENTS SHOULD NOT ALSO BE PRESENTED.

PARTIAL DRAWING OF FUNDS SHALL BE PERMITTED UNDER THIS LETTER OF

CREDIT, AND THIS LETTER OF CREDIT SHALL REMAIN IN FULL FORCE AND EFFECT 891
Exhibit K - 2

WITH RESPECT TO ANY CONTINUING BALANCE, PROVIDED, THE AVAILABLE

AMOUNT SHALL BE REDUCED BY THE AMOUNT OF EACH SUCH DRAWING PAID HEREUNDER.

THIS LETTER OF CREDIT IS NOT TRANSFERABLE OR ASSIGNABLE. ANY

PURPORTED TRANSFER OR ASSIGNMENT SHALL BE VOID AND OF NO FORCE OR EFFECT.

ALL CORRESPONDENCE AND ANY DRAWINGS (OTHER THAN THOSE MADE BY FACSIMILE) HEREUNDER ARE TO BE DIRECTED TO [•]. ATTN: [•].

ALL NOTICES TO BENEFICIARY WILL BE IN WRITING AND ARE REQUIRED TO BE SENT BY CERTIFIED MAIL OR OVERNIGHT COURIER TO: [•], MANAGER OF RISK OPERATIONS AND COLLATERAL MANAGEMENT, [•]. [•]. ONLY NOTICES TO

BENEFICIARY MEETING THE REQUIREMENTS OF THIS PARAGRAPH SHALL BE CONSIDERED VALID. ANY NOTICE TO BENEFICIARY WHICH IS NOT IN

ACCORDANCE WITH THIS PARAGRAPH SHALL BE VOID AND OF NO FORCE OR EFFECT.

BANKING CHARGES SHALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT.

THIS LETTER OF CREDIT SETS FORTH IN FULL OUR OBLIGATIONS AND SUCH

OBLIGATIONS SHALL NOT IN ANY WAY BE MODIFIED, AMENDED, AMPLIFIED OR

LIMITED BY REFERENCE TO ANY DOCUMENTS, INSTRUMENTS OR AGREEMENTS

REFERRED TO HEREIN, EXCEPT ONLY THE ATTACHMENT REFERRED TO HEREIN,

AND ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE BY

REFERENCE ANY DOCUMENT, INSTRUMENT OR AGREEMENT EXCEPT FOR SUCH ATTACHMENT. EXCEPT IN THE CASE OF AN INCREASE IN THE AVAILABLE

AMOUNT OR EXTENSION OF THE EXPIRATION DATE, THIS LETTER OF CREDIT MAY

NOT BE AMENDED OR MODIFIED WITHOUT THE BENEFICIARY'S PRIOR WRITTEN CONSENT.

THE BANK ENGAGES WITH THE BENEFICIARY THAT BENEFICIARY'S DRAFTS

DRAWN UNDER AND IN COMPLIANCE WITH THE TERMS OF THIS LETTER OF

CREDIT WILL BE DULY HONORED IF PRESENTED TO THE BANK ON OR BEFORE THE EXPIRATION DATE.

EXCEPT SO FAR AS OTHERWISE STATED, THIS LETTER OF CREDIT IS SUBJECT TO THE INTERNATIONAL STANDBY PRACTICES ISP98 (ALSO KNOWN AS ICC PUBLICATION NO. 590), OR REVISION CURRENTLY IN EFFECT (THE "ISP"). AS TO

MATTERS NOT COVERED BY THE ISP, THE LAWS OF THE STATE OF NEW YORK,

WITHOUT REGARD TO THE PRINCIPLES OF CONFLICTS OF LAWS THEREUNDER, SHALL GOVERN ALL MATTERS WITH RESPECT TO THIS LETTER OF CREDIT. [•]

AUTHORIZED SIGNATURE FOR BANK
892
Exhibit K - 2
BY:

NAME:

TITLE:
893
Exhibit K - 2

ATTACHMENT A

DRAWING CERTIFICATE
TO: [•]
[•]
[•]
ATTN: [•]

IRREVOCABLE NON-TRANSFERABLE STANDBY LETTER OF CREDIT REFERENCE NUMBER: []
DATE: (INSERT DATE OF ISSUE)
[•] (THE "BENEFICIARY"), DEMANDS [•], (THE "BANK") PAYMENT TO THE ORDER OF

THE BENEFICIARY THE AMOUNT OF USD (INSERT AMOUNT) (INSERT AMOUNT IN WORDS U.S. DOLLARS), DRAWN UNDER THE LETTER OF CREDIT REFERENCED ABOVE (THE "LETTER OF CREDIT"), FOR THE FOLLOWING REASON(S) (CHECK APPLICABLE PROVISION):
( )A. AN EVENT OF DEFAULT, AS DEFINED IN THAT CERTAIN [] AGREEMENT BETWEEN [•] OR ITS SUCCESSOR (THE “APPLICANT”) AND BENEFICIARY, DATED AS OF [] (AS MAY BE AMENDED FROM TIME TO TIME) (THE "AGREEMENT") WITH RESPECT TO THE APPLICANT HAS OCCURRED AND IS CONTINUING. ( )B. THE LETTER OF CREDIT WILL EXPIRE IN FEWER THAN [] BUSINESS DAYS (AS

DEFINED IN THE AGREEMENT) FROM THE DATE HEREOF, AND THE APPLICANT OR

ITS SUCCESSOR HAS NOT PROVIDED BENEFICIARY ALTERNATIVE FINANCIAL SECURITY ACCEPTABLE TO BENEFICIARY.
( )C. BENEFICIARY IS ENTITLED TO RETAIN ALL OR PART OF THE PROJECT SECURITY (AS DEFINED IN THE AGREEMENT).

UNLESS OTHERWISE PROVIDED HEREIN, CAPITALIZED TERMS WHICH ARE USED

AND NOT DEFINED HEREIN SHALL HAVE THE MEANING GIVEN EACH SUCH TERM IN THE LETTER OF CREDIT.

AUTHORIZED SIGNATURE FOR BENEFICIARY:
[•]
BY:

NAME: (PRINT NAME)
TITLE: (PRINT TITLE)
894
Exhibit K - 2

ATTACHMENT B

SIGHT DRAFT
TO: [•]
[•]
[•]
[•]
DATE: (INSERT ISSUE DATE)
PAY AT SIGHT TO THE ORDER OF [•] (THE "BENEFICIARY")

THE AMOUNT OF (USD INSERT AMOUNT) (AMOUNT IN WORDS)
DRAWN UNDER [•], IRREVOCABLE NON-TRANSFERABLE STANDY LETTER OF CREDIT NUMBER [] ISSUED ON []

FUNDS PAID PURSUANT TO THE PROVISIONS OF THE LETTER OF CREDIT SHALL BE

WIRE TRANSFERRED TO THE BENEFICIARY IN ACCORDANCE WITH THE FOLLOWING INSTRUCTIONS:
(INSERT WIRING INSTRUCTION)

AUTHORIZED SIGNATURE
[•]
BY:

NAME: (PRINT NAME)
TITLE: (PRINT TITLE)
895
Exhibit L -1

EXHIBIT L
[RESERVED]
896
Exhibit M - 1

EXHIBIT M

FORM OF REPLACEMENT RA NOTICE
This Replacement RA Notice (this “Notice”) is delivered by [SELLER ENTITY] (“Seller”) to [______], a California joint powers authority (“Buyer”) in accordance with the terms of that certain Energy Storage Service Agreement dated __________ (“Agreement”) by and between Seller and Buyer. All capitalized terms used in this Notice but not otherwise defined herein shall have the respective meanings assigned to such terms in the Agreement.

Pursuant to Section 3.5 of the Agreement, Seller hereby provides the below Replacement RA product information:
897
Exhibit M - 2
[SELLER ENTITY]
By:

Its:

Date:
898
Exhibit N - 1

EXHIBIT N

NOTICES

NORTH JOHNSON ENERGY CENTER,
LLC
(“Seller”)

SAN DIEGO COMMUNITY POWER
(“Buyer”)
All Notices:

Street: 650 Bercut Dr. Suite C
City: Sacramento, CA 95811
Attn: Hal Dittmer
Phone: 916-447-5171
Email: [email protected]
All Notices:

PO Box 12716
San Diego, CA 92112
Attn: Chief Commercial Officer
Phone: (619) 657-0422
Email:
[email protected]
Reference Numbers:

Duns: [To be Updated]
Federal Tax ID Number: [To be Updated]
Reference Numbers:

Duns:

Federal Tax ID Number:

Invoices:

Attn: Accounting department
Phone: 916-447-5171
Email: [email protected]
Invoices:

Attn: SDCP Settlements
Phone: (619) 880-6545
Email: [email protected]
Scheduling:

Attn: 24 Hour Operations
Phone: 916-447-5171
Email: [email protected]
Scheduling:

Tenaska Power Services Co.

Attn: Kara Whillock
Phone: (972) 333-6122
Email: [email protected]
Day Ahead: (817) 303-1115
Real Time: (817) 303-1852
Facsimile: (817) 303-1104
Confirmations:

Attn: 24 Hour Operations
Phone: 916-447-5171
Email: [email protected]
Confirmations:

Attn: SDCP Settlements
Phone: (619) 880-6545
Email: [email protected]
Payments:

Attn: Accounting department
Phone: 916-447-5171
Email: [email protected]
Payments:

Attn: Michael Maher
Phone: (415) 526-3020
Email: [email protected]
Wire Transfer: [To be Updated]
BNK:

ABA:

ACCT:

Wire Transfer:

BNK: River City Bank
ABA:

ACCT:
899
Exhibit N - 2

NORTH JOHNSON ENERGY CENTER,
LLC
(“Seller”)

SAN DIEGO COMMUNITY POWER
(“Buyer”)
With additional Notices of an Event of
Default to:

Attn: Gregory Contreras
Phone: 916-281-8440

Email:[email protected]
With additional Notices of an Event of
Default to:

PO Box 12716
San Diego, CA 92112
Attn: SDCP General Counsel
Email: [email protected]
Emergency Contact: [To be Updated]
Attn:

Phone:

Email:

Emergency Contact:

Attn: Chief Commercial Officer
Phone: (619) 657-0422
Email:
[email protected]
900
Exhibit O - 1

EXHIBIT O

CAPACITY AND EFFICIENCY RATE TESTS
Capacity Test Notice and Frequency
A. Commercial Operation Capacity Test(s). Upon no less than ten (10) Business Days prior Notice to Buyer, Seller shall schedule and complete a Commercial Operation Capacity Test prior to the Commercial Operation Date. Such initial Commercial Operation Capacity Test (and any subsequent Commercial Operation Capacity Test permitted in accordance with Section 6 of Exhibit B) shall be performed in accordance with this Exhibit O and shall establish the Installed Capacity and initial Efficiency Rate hereunder based on the actual capacity and capabilities of the Facility determined by such Commercial Operation Capacity Test(s).

B. Subsequent Capacity Tests. Following the Commercial Operation Date, at least fifteen (15) days in advance of the start of each Contract Year, upon no less than ten (10) Business Days prior Notice to Buyer, Seller shall schedule and complete a Capacity Test. In addition to the annual capacity test, if Buyer has reason to believe that the Effective Capacity or the Efficiency Rate is materially less than shown by the most recent test results, Buyer shall have the right to require a Capacity Test at any time upon no less than five (5) Business Days prior Notice to Seller.

Seller shall have the right to run a retest of any Capacity Test at any time upon five (5) Business Days’ prior Notice to Buyer (or any shorter period reasonably acceptable to Buyer consistent with Prudent Operating Practice).

C. Test Results and Re-Setting of Effective Capacity and Efficiency Rate. No later than five (5) days following any Capacity Test, Seller shall submit a testing report detailing results and findings of the test. The report shall include Facility Meter readings and plant log sheets verifying the operating conditions and output of the Facility. In accordance with Section 4.4(a)(ii) of the Agreement and Part II(I) below, after the Commercial Operation Capacity Test(s), the Effective Capacity (up to, but not in excess of, the Installed Capacity) and Efficiency Rate determined pursuant to such Capacity Test shall become the new Effective Capacity and Efficiency Rate at the beginning of the day following the completion of the test for calculating the Monthly Capacity Payment and all other purposes under this Agreement.

Capacity Test Procedures
PART I. GENERAL.

A. Each Capacity Test shall be conducted in accordance with Prudent Operating Practices, the Operating Restrictions, and the provisions of this Exhibit O. For ease of reference, a Capacity Test is sometimes referred to in this Exhibit O as a “CT”.

Buyer or its representative may be present for the CT and may, for informational purposes only, use its own metering equipment (at Buyer’s sole cost).

B. Conditions Prior to Testing.
901
Exhibit O - 2
(1) EMS Functionality. The EMS shall be successfully configured to receive data from the Battery Management System (BMS), exchange DNP3 data with the Buyer SCADA device, and transfer data to the database server for the calculation, recording and archiving of data points. (2) Communications. The Remote Terminal Unit (RTU) testing should be successfully completed prior to any testing. The interface between Buyer’s RTU and the Facility SCADA System should be fully tested and functional prior to starting any testing, including verification of the data transmission pathway between Buyer’s RTU and Seller’s EMS interface and the ability to record SCADA System data.
(3) Commissioning Checklist. Commissioning shall be successfully completed per manufacturer guidance on all applicable installed Facility equipment, including verification that all controls, set points, and instruments of the EMS are configured.

PART II. REQUIREMENTS APPLICABLE TO ALL CAPACITY TESTS.

Note: Seller shall have the right and option in its sole discretion to install storage capacity in excess of the Guaranteed Capacity; provided, for all purposes of this Agreement, the amount of Installed Capacity shall never be deemed to exceed the Guaranteed Capacity, and all SOC measurements associated with a Capacity Test shall be based on the Installed Capacity without taking into account any capacity that exceeds the Guaranteed Capacity.

A. Test Elements. Each CT shall include at least the following individual test elements, which must be conducted in the order prescribed in Part III of this Exhibit O, unless the Parties mutually agree to deviations therefrom. The Parties acknowledge and agree that should Seller fall short of demonstrating one or more of the Test Elements as specified below, the Test will still be deemed “complete,” and any adjustments necessary to the Effective Capacity or to the Efficiency Rate resulting from such Test, if applicable, will be made in accordance with this Exhibit O. (1) Electrical output at maximum discharging level (MW) for four (4) continuous hours; and
(2) Electrical input at maximum charging level at the Facility Meter (MW), as sustained until the SOC reaches at least 90%, continued by the electrical input at a rate up to the maximum charging level at the Facility Meter (MW), as sustained until the SOC reaches 100%, not to exceed six (6) hours of total charging time.

B. Parameters. During each CT, the following parameters shall be measured and recorded simultaneously for the Facility, at the specified intervals:
(1) Time in 1-minute intervals;
902
Exhibit O - 3
(2) The amount of Discharging Energy to the Facility Meters (kWh) (i.e., to each measurement device making up the Facility Meter) in 5-minute intervals;
(3) Net electrical energy input from the Facility Meters (kWh) (i.e., from each measurement device making up the Facility Meter) in 5-minute intervals; and
(4) Stored Energy Level (MWh) in 1-minute intervals.

C. Site Conditions. During each CT, the following conditions at the Site shall be measured and recorded simultaneously at thirty (30) minute intervals:
(1) Relative humidity (%);
(2) Barometric pressure (inches Hg) near the horizontal centerline of the Facility; and
(3) Ambient air temperature (°F).

D. Test Showing. Each CT shall record and report the following datapoints:
(1) That the CT successfully started;
(2) The maximum sustained discharging level for four (4) consecutive hours pursuant to A(1) above;
(3) The maximum sustained charging level for six (6) consecutive hours (or such lesser time as is required to reach 100% SOC) pursuant to A(2) above; (4) Intentionally Omitted;
(5) Intentionally Omitted;
(6) Amount of Charging Energy, registered at the Facility Meter, to go from 0% SOC to 100% SOC;
(7) Amount of Discharging Energy, registered at the Facility Meter, to go from 100% SOC to 0% SOC.

E. Test Conditions.
(1) General. At all times during a CT, the Facility shall be operated in compliance with Prudent Operating Practices, the Operating Restrictions, and all operating protocols recommended, required or established by the manufacturer for the Facility.
903
Exhibit O - 4
(2) Abnormal Conditions. If abnormal operating conditions that prevent the testing or recordation of any required parameter occur during a CT, Seller may postpone or reschedule all or part of such CT in accordance with Part II.F below.
(3) Instrumentation and Metering. Seller shall provide all instrumentation, metering and data collection equipment required to perform the CT. The instrumentation, metering and data collection equipment electrical meters shall be calibrated in accordance with Prudent Operating Practice and, as applicable, the CAISO Tariff.

F. Incomplete Test. If any CT is not completed in accordance herewith, Buyer may in its sole discretion: (i) accept the results up to the time the CT stopped without any modification to the Effective Capacity or Efficiency Rate pursuant to Section I below; (ii) require that the portion of the CT not completed, be completed within a reasonable specified time period; or (iii) require that the CT be entirely repeated within a reasonable specified time period. Notwithstanding the above, if Seller is unable to complete a CT due to a Force Majeure Event or the actions or inactions of Buyer or the CAISO or the Transmission Provider, Seller shall be permitted to reconduct such CT on dates and at times reasonably acceptable to the Parties.

G. Test Report. Within five (5) Business Days after the completion of any CT, Seller shall prepare and submit to Buyer a written report of the results of the CT, which report shall include:
(1) A record of the personnel present during the CT that served in an operating, testing, monitoring or other such participatory role;
(2) The measured and calculated data for each parameter set forth in Part II.A through D, including copies of the raw data taken during the test; and (3) Seller’s statement of either Seller’s acceptance of the CT or Seller’s rejection of the CT results and reason(s) therefor.

Within ten (10) Business Days after receipt of such report, Buyer shall notify Seller in writing of either Buyer’s acceptance of the CT results or Buyer’s rejection of the CT and reason(s) therefor. If either Party rejects the results of any CT, such CT shall be repeated in accordance with Part II.F.

H. Supplementary Capacity Test Protocol. No later than sixty (60) days prior to commencing Facility construction, Seller shall deliver to Buyer for its review and approval (such approval not to be unreasonably delayed or withheld) a supplement to this Exhibit O with additional and supplementary details, procedures and requirements applicable to Capacity Tests based on the then current design of the Facility (“Supplementary Capacity Test Protocol”). Thereafter, from time to time, Seller may deliver to Buyer for its review and approval (such approval not to be unreasonably delayed or withheld) any Seller recommended updates to the then-904 Exhibit O - 5
current Supplementary Capacity Test Protocol. The initial Supplementary Capacity Test Protocol (and each update thereto), once approved by Buyer, shall be deemed an amendment to this Exhibit O.

I. Adjustment to Effective Capacity and Efficiency Rate. The Effective Capacity and Efficiency Rate shall be updated as follows:
(1) The total amount of Discharging Energy delivered to the Delivery Point (expressed in MWh AC) during the first four (4) hours of discharge (up to, but not in excess of, the product of (i) (a) the Guaranteed Capacity (in the case of a Commercial Operation Capacity Test, including under Section 6 of Exhibit B) or (b) the Installed Capacity (in the case of any other Capacity Test), multiplied by (ii) four (4) hours) shall be divided by four (4) hours to determine the Effective Capacity, which shall be expressed in MW AC, and shall be the new Effective Capacity in accordance with Section 4.4(a)(ii) of the Agreement.
(2) The total amount of Discharging Energy (as reported under Section II.D(7) above) divided by the total amount of Charging Energy (as reported under Section II.D(6) above), and expressed as a percentage, shall be recorded as the new Efficiency Rate, and shall be used for the calculation of the Efficiency Rate liquidated damages in Exhibit C until updated pursuant to a subsequent Capacity Test.

PART III. INITIAL SUPPLEMENTARY CAPACITY TEST PROTOCOL.

A. Effective Capacity and Efficiency Rate Test
• Procedure:
(1) System Starting State: The Facility will be in the on-line state at 0% SOC. (2) Record the initial value of the SOC.
(3) Command a real power charge that results in an AC power of Facility’s maximum charging level and continue charging until the earlier of (a) the Facility has reached 100% SOC or (b) six (6) hours have elapsed since the Facility commenced charging.
(4) Record and store the SOC after the earlier of (a) the Facility has reached 100% SOC or (b) six (6) hours of continuous charging. Such data point shall be used for purposes of calculation of the Battery Charging Factor. (5) Record and store the amount of Charging Energy, registered at the Facility Meter, to go from 0% SOC to 100% SOC.
905
Exhibit O - 6
(6) Following one (1) hour rest period, command a real power discharge that results in an AC power output of the Facility’s maximum discharging level and maintain the discharging state until the earlier of (a) the Facility has discharged at the maximum discharging level for four (4) consecutive hours, or (b) the Facility has reached 0% SOC.
(7) Record and store the SOC after four (4) hours of continuous discharging.

Such data point shall be used for purposes of calculation of the Battery Discharging Factor. If the Facility SOC remains above zero percent (0%) after discharging at a rate at or above the Guaranteed Capacity (or at or above the Installed Capacity after a Commercial Operation Capacity Test) for four (4) consecutive hours pursuant to Part III.A.6(a), the SOC will be deemed 0 for the purposes of calculating the Battery Discharging Factor. (8) Record and store the Discharging Energy as measured at the Facility Meter.

Such data point shall be used for purposes of calculation of the Effective Capacity.
(9) If the Facility has not reached 0% SOC pursuant to Section III.A.6, continue discharging the Facility until it reaches a 0% SOC.
(10) Record and store the Discharging Energy as measured at the Facility Meter from the commencement of discharging pursuant to Part III.A.6 until the Facility has reached a 0% SOC pursuant to either Part III.A.7 or Part III.A.9, as applicable.
• Test Results:
(1) The resulting Effective Capacity measurement is the sum of the total Discharging Energy after 4 hours of continuous discharging at the Facility Meter divided by four (4) hours.

The starting interval of the Capacity Test is the first 5-minute interval for which the output is above 99% of the commanded discharge output.

The ending interval of the Capacity Test is the 5-minute interval that ends 4 hours after the commencement of the starting interval. (2) The total amount of Discharging Energy (as reported under Section III.A(10) above) divided by the total amount of Charging Energy (as reported under Section III.A(5) above), and expressed as a percentage, shall be recorded as the new Efficiency Rate, and shall be used for the calculation of the Efficiency Rate liquidated damages in Exhibit C until updated pursuant to a subsequent Capacity Test.

The starting interval of the Efficiency Rate test is the interval before the first 5-minute interval for which the output is above 99% of the commanded 906
Exhibit O - 7
discharge output.

The ending interval of the Efficiency Rate test is the interval after the last 5-minute interval for which the output is above 99% of the commanded discharge output.

B. Intentionally Omitted.

C. Intentionally Omitted.

D. Intentionally Omitted.

E. Intentionally Omitted.
907
Exhibit P - 1

EXHIBIT P

FACILITY AVAILABILITY CALCULATION
Monthly Capacity Availability Calculation. Seller shall calculate the “Monthly Capacity Availability” from the Commercial Operation Date through the RA Guarantee Date and thereafter for each given month of the Delivery Term using the formula set forth below:
[AVAILHRSm + EXCUSEDHRSm]
Monthly Capacity Availability (%) =
[MONTHRSm]
Where:
m = relevant month “m” in which Monthly Capacity Availability is calculated; MONTHRSm is the total number of hours for the month;
AVAILHRSm is the total number of hours, or partial hours, in the month during which the Facility was available to charge and discharge Energy between the Facility and the Delivery Point and to provide Ancillary Services at the Delivery Point (excluding, for avoidance of doubt, all circumstances at the high-voltage side of the Delivery Point or beyond that may limit Seller’s delivery of Product). If the Facility is available pursuant to the preceding sentence during any applicable hour, or partial hour, but for less than the full amount of the Effective Capacity, the AVAILHRSm for such time period shall be calculated by multiplying such AVAILHRSm by a percentage determined by dividing (a) by (b); where (a) is the lower of (i) such capacity amount reported as available by Seller’s real-time EMS data feed to Buyer for the Facility for such hours, or partial hours, and (ii) Seller’s most recent Availability Notice (as updated pursuant to Section 4.10(b)), and (b) is the Effective Capacity.