1 • Subtitle
New SV Clean Energy
PowerPoint Template
Update on Potential Plans for
Return to In-Person Board /
Committee Meetings
Kevin Armstrong, Admin Svcs Mgr
Andrea Pizano, Board Clerk
April 8, 2022
Item 3

PRESENTATION
2 Remote Meetings and Noticing Requirements
AB361 allows for
remote meetings with
relaxed noticing until
Jan 1, 2024
If the State of
Emergency is lifted
before legislation is
enacted, previous
Brown Act noticing
requirements will apply
• If the Governor lifts the State of Emergency
then previous Brown Act noticing
requirements will apply:
• Noticing remote locations in advance
• Making remote locations open and accessible
to the public
• New Legislation may codify existing
“relaxed” notification requirements, but may
not take effect until Jan 1, 2023
Item 3

PRESENTATION
3 Virtual Attendance
If stricter Brown Act
requirements return,
SVCE staff recommend
that:
• Board members utilize an existing publicly-accessible location that allows for ADA access and full public participation
• City Halls / Community Centers / Etc.
• SVCE work with Member Agencies to cover
any fees / staff time needed to open
facilities for Meetings (evenings)
• Provide the ability to attend meetings from
SVCE’s office (Committee meetings / fully-remote Board meetings) Item 3

PRESENTATION
4 Draft Schedule
SVCE proposes easing
back into hybrid
meetings over the next
2-3 months
• April:
• Test Hybrid Meeting Setup with Cupertino staff
• Survey Board Members for Remote Location
Needs / Desires
• May:
• Initial Hybrid Board Meeting at Cupertino
• June - July:
• Expected completion of SVCE Conference
Room Upgrades – Committee Meetings may
resume in hybrid format
Item 3

PRESENTATION
5 Recommendation
Conduct the May 11, 2022 Board of Directors Meeting as a Hybrid Meeting, with the option to attend in-person at Cupertino Community Hall, or remote via Zoom.

Item 3

PRESENTATION
6 Appendices
Pending Legislation
Remote Location Assistance
Options Available
Item 3

PRESENTATION
7 Pending Legislation
Several bills at the
State Legislature could
affect Brown Act
teleconferencing
requirements; but none
are considered urgent
legislation
• AB 1944 (Support) – private locations do
not require noticing; public teleconferencing
required
• SB 1100 (Support) – public agencies may
remove disruptive audience members
individually
• AB 2449 (Watch) – public agencies may
relax teleconferencing requirements if
quorum of body is present in one location
Item 3

PRESENTATION
8 Remote Location Assistance
SVCE Staff will work to
ensure smooth remote
participation by all
Board members, in
coordination with on-site staff
• SVCE staff will cover fees associated with
the use of an off-site location, including
working with member agencies to develop
reimbursement agreements for member
agency staff time needed to open public
facilities for remote attendance
• SVCE staff will do their best to provide the
technical equipment needed for remote
meetings, but will not be able to provide on-site support at remote locations Item 3

PRESENTATION
9 Options Available
SVCE Staff is working
to prepare for Hybrid
Brown Act Meetings,
both on- and off-site, to
prepare for a period
under prior Brown Act
requirements, but
before permanent
legislation is enacted
• In-Person / Hybrid Meetings
• Board - Cupertino Community Hall
• Re-opening for in-person Meetings in April
• SVCE staff to conduct dry run of hybrid setup in April • Committee - SVCE Offices
• SVCE outfitting conference rooms with improved audio-visual equipment
• Public accessibility may affect meeting requirements
• Fully-remote
• Board members, staff, and public continue to attend from individual locations
• More likely if Brown Act noticing requirements aren’t applicable Item 3

PRESENTATION
• Subtitle
New SV Clean Energy
PowerPoint Template
Item 4

PRESENTATION
•
Item 4

PRESENTATION
Item 4

PRESENTATION
2022- Q1 Slate & Big Beau Solar+ Storage, Coso Geothermal .. ...
,. ...
2022 - Q2 Casa Diablo Geothermal
2022 - Q3 Rabbitbrush Solar+ Storage
.. ... ,. ...
2022 - Q4 Yellow Pine Solar+ Storage & Atlas Solar
2023- Q1 Mountain View & Cameron Crest Wind
2023- Q2, Q3 Angela & Aratina Solar+ Storage
2023- Q3, Q4 Victory Pass & San Luis West Solar+ Storage 3 •
•
•
•
•
•
•
•
•
•
•
Item 4

PRESENTATION
Projects are coming on-line but face interconnection and other challenges Online
Coso's existing Geothermal project started delivery on January 1, 2022 Recurrent's Slate solar plus energy storage plant achieved PPA and CAISO COD in Q1 2022 Under Construction / Pre-COD
EDF's Big Beau solar PV testing and CAISO grid synchronization started in November 2021.

Storage system delayed.

Ormat's Casa Diablo geothermal expected to COD in Q2 2022.

AES's Mountain View Wind project expected to be completed 6 months early Leeward's Rabbitbrush solar plus storage project started construction in November 2021.

NextEra's Yellow Pine solar plus storage project started construction in Q1 2022 Pre-Construction
Other projects continue to face delays due to COVID-19, labor shortages and/or supply-chain delivery issues
4 •
•
Item 4

PRESENTATION
Slate Solar (93 MW) + Storage (46.5 MW) COD January 2022 Operating in the 24x7
CAISO Day-Ahead
and Real-Time
markets
SVCE is working in
partnership with 3CE
and ZGlobal to
develop optimal
market strategies that
maximize capacity
attributes and energy
value
5 Item 4

PRESENTATION
Big Beau Solar (70 MW) + Storage (22 MW)
CODQ2 2022 6
Item 4

PRESENTATION
Ormat's CD4 New Geothermal 7 MW
COD June 15, 2022
Mountain View Wind - Repowered 33.5 MW
COD January 2023
7 Item 4

PRESENTATION
Rabbitbrush Solar (40 MW) + Storage (8 MW)
CODQ3 2022
8 Item 4

PRESENTATION
Yellow Pine Solar (50 MW)+ Storage (26 MW)
CODQ42022
9 Item 4

PRESENTATION
,, .... ~ .
......
.
.

← All documents from this meeting