• Subtitle
New SV Clean Energy
PowerPoint Template
Item 3

PRESENTATION
• IOUs RPS portfolios available to all load
serving entities (“LSEs”), including SVCE
• LSE’s elect to participate for allocations
starting in January 2023
• Commitment by June 10, 2022, for
minimum 10-year term
Item 3

PRESENTATION
© Voluntary Allocation Market Offer ("VAMO")
VAMO authorized
by the CPUC as
part of the PCIA
proceeding
2 Item 3

PRESENTATION
© PG&E's RPS Resource Mix & VAMO products
84% of PG&E's
portfolio is from
Portfolio Content
Category One
("PCC1") resources
(solar PV, wind)
Some of PG&E's
portfolio comes with
biomass and
uncertain PCC0
resources
■ Bro
P Cl Po--Uo i
2% 7¥6
57%
2½
5%
3 Not typical RPS product procured by
SVCE
Resource types, quantity, REC price and term uncertain
•
•
•
•
Item 3

PRESENTATION
Staff anticipates that
no more than 40%
of its PG&E VAMO
share may be
necessary - this
translates to about
10% of SVCE's RPS
portfolio
Resource Type: May include out-of-state RPS resources
("PCC2"); un-bundled RECs ("PCC3"); and biomass/biogass resources which are limited from an annual compliance
standpoint and/or carry reportable greenhouse gas emissions.

Quantity: SVCE may elect to take allocation in increments of 10% of total share. The actual amount will vary based on generation output and subject to rebalancing if PG&E sells off RPS resources.

Price: based on annual PCIA market price benchmark which will vary year-to-year
Term: based on resources in PG&E's RPS portfolio which can be 30 years
4 •
•
•
Item 3

PRESENTATION
S8350 requires 65% of
RPS contracted through
long-term resources (10
years or greater)
SVCE Board approved a
5% over-procurement
margin as part of
Integrated Resource Plan
VAMO allocations are
from projects which
already exist and
therefore have no
development risk.

1. State Mandated RPS per Compliance
Period - % of Retail Sales

2. State Mandated % of Mandated RPS (Row
#1) to be Contracted Under RPS Long-term
Contracts

3. State Mandated % of Retail Sales with RPS
Long-term Contracts (Row 2* Row 1)

4. SVCE: Current Compliance with Row #3:

Existing RPS Achieved with Long-term
Contracts
'I
2021-
2024
40%
65%
26%

37.6%
2025-
2027
50%
65%
33%

60.6%
2028-
2030
60%
65%
39%

57.7%
5 • Authorize SVCE’s Chief Executive Officer (CEO) to participate in Pacific Gas and Electric’s (PG&E) Voluntary Allocation Market Offer (VAMO) for a portion of its load ratio share and execute necessary agreements including the Voluntary Allocation Confirmation under Pacific Gas and Electric (PG&E) and SVCE Master Power Purchase and Sale Agreement. • The CEO will only exercise the delegated authority should he deem it necessary to meet long-term procurement directives, in an amount not to exceed four increments of VAMO allocation - equivalent to approximately a 10% RPS - and will report back to the Board in a timely fashion.

Item 3

PRESENTATION
rA, s1L1coN VALLEY ~ CLEAN ENERGY 6
• Subtitle
New SV Clean Energy
PowerPoint Template
Item 4

PRESENTATION
Item 4

PRESENTATION
To provide a concise summary of your next
steps to adopt reach codes this year.
rA, s1L1coN VALLEY ~ CLEAN ENERGY 2
•
•
Item 4

PRESENTATION
© Reach Code Steps Board Member Checklist
This list can help you
track progress.

SVCE can provide
technical assistance and
outreach support
throughout the process.

Action
Attend first meeting w/SVCE staff
Identify your ideal level of reach
(your goal)
Confirm appropriate staff are
engaged and aware of your goals
Confirm council info sessions and
vote sessions are agendized
Confirm City Manager signed LOI
Vote
Suggested
Completion Done?
Date
2/1/2022
3/31/2022
3/31/2022
4/30/2022
4/30/2022
10/31/2022 3
•••
Item 4

PRESENTATION
All thirteen jurisdictions
Initial SVCE
Jurisdiction oardmembe Signed LOI Council/ Board Supported 1:1 Technical are actively engaged.
and Staff Item Agendized Public Consultation w
Meetings Outreach Consultants
Recommended Optional
Several jurisdictions
have leveraged SVCE
Campbell X X
for public outreach and Cupertino X X
TRC for technical Gilroy X X X
assistance. Los Altos X X Planned
Los Altos Hills X X
Los Gatos X X
We suggest completing Milpitas X X
all recommended Monte Sereno X X X
actions this month. Morgan Hill X X
Mountain View X X X
Santa Clara Co. X X
Saratoga X X
Sunnyvale X X X 4
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
LOI
Conduct Outreach
Effective
Vote
Potential CEC Submittals
Define Goals
Agendize
Engage Staff
Define Approach
Write Code Language
Council Info Sessions
Item 4

PRESENTATION
Orange text
indicates a
Boardmember task
Goals and Approach Defined
Reach Codes Agendized
City Manager LOI Signed
Staff Responsibilities Defined
Proposed Code language complete
Outreach conducted
Council informed
Final code language complete
Vote complete, same meeting as
state code adoption
Documentation done 5
•
•
Item 4

PRESENTATION
1-stop shop website for
three counties
Bayareareachcodes.org
-L* EASTBAY
I~ COMMUNITY ~ • ENERGY
A PENINSULA ~ CLEAN ENERGY

OFFICE OF

SUSTAINABILITY

COUNTY OF SAN MATEO
rlt\ SILICON VALLEY ~ CLEAN ENERGY
City Participation Recommended Reach Codes About Reach Codes Process & Timeline Resources FAQ Events Stay in Touch 2022 Building Electrification & EV Infrastructure Reach Code Initiative
6 Item 4

PRESENTATION
Videos
Model Reach Codes
Video: How Heat Pumps Work
Building Electrification
0 All-Electric
Building Code Ordinance
This model is based on an ordinance adopted
by the City of Menlo Park and can be used for
all Climate Zones in California. The
amendment is for 2022 Title 24 Part 11 Green
Building Standards (also referred to as
CALGreen) and allows only electric
appliances for specific end-uses. Over 30
jurisdictions adopted a simi lar model in
Cal ifornia in the 2019 code cycle.

PART 11 ALL-ELECTRIC BUILDING REACH

CODE ORDINANCE

EXCEPTIONS
Video: 5 Benefits of Induction Cooking
0 All-Electric
Municipal Code Ordin ance
This model is a municipal code ordinance that
broadly requires buildings to be constructed
without any natural gas lines with limited
exceptions. The municipal code amendment
is not tied to the building code cycle and can
be adopted indefinitely. Over the last two
years about 10 jurisdictions adopted some
form of this ordinance.

ALL ELECTRIC M UNICIPAL ORDI NANCE

EXCEPTIONS
Video: Why an Electric Home is Better
Existing Buildings
Electrification Ordinances
Due to added complexity and a heightened
need to address equity when decarbonizing,
cities have taken customized approaches to
decarbonizing their existing building stock.

Please visit back to access resources we are
developing, including:

1. Policy Framework and links to adopted
ordinances. Coming in April 2022.

2. All-Electric Municipal Code - code
language addressing existing building
permits. Coming in May 2022.

3. Templates and tools. Coming in May
2022.
7 Item 4

PRESENTATION
Process and
Timeline
Webinars
Process & Timeline
af----------------.+e....------ 0
Contact

PCE/SVCE/EBCE
to understand
resources
available*
Conduct
community
engagement
Draft local
amendments
' Letter of Intent for $10,000 support grant from your local CCA "Payment of $10,000 support grant from your local CCA
Upcoming Events
Ext.em,il Events
• April 26th, 2022 - Reach Codes Newcomers Webinar Series: Session 4 (BayREN) o Reach code ordinance options
o nme: 10:00 AM - 11 :30 AM PST. Location: Webinar
o Register here
• May 3rd, 2022 - Statewide Reach Codes Team Webinar
o Results & Findings: Single Family New Construction Cost-Effectiveness Study o nme: 10:00 AM - 11 :30 AM PDT. Location: Webinar
o Register here
• May 11th, 2022 - Statewide Reach Codes Team Webinar
o Draft Results: Nonresidential New Construction Cost-Effectiveness Study o nme: 10:00AM - 11 :30 AM PDT. Location: Webinar
o Register here
• September 27th, 2022 - Reach Codes Newcomers Webinar Series: Session 5 (BayREN) o Implementation
o nme: 10:00 AM - 11 :30 AM PST. Location: Webinar
o Register here
0 e e
Submit to council Application to File with Building
for review** Energy Standards
Commission Commission
Past Events
• April 13th, 2022 - City Staff Feedback Event (Existing Buildings) o n me: 2:00 PM - 4:00 PM PST. Location: Webinar
o View recording
• February 17th, 2022 - City Staff Feedback Event
o n me: 10:00AM -12:00 PM PST. Location: Webinar
o View slide deck
o View recording
• February 16th, 2022 - Community Feedback Event
o nme: 6:00 PM - 7:30 PM PST, Location: Webinar
o View slide deck
o View recording
• February 15th, 2022 - Building Industry Feedback Event o n me: 10:00AM -12:00 PM PST. Location: Webinar
o View slide deck
o View recording
• January 26th, 2022 - Kickoff Meeting for City Staff
o nme: 11 :00 AM - 12:30 PM PST, Location: Webinar
o View slide deck
o View recording
Item 4

PRESENTATION
EV Zoning Code
Support for
Adoption, Cost
Effectiveness and
Implementation
Electric Vehicle Infrastructure
Building on the stakeholder engagement learnings of 2019 building code cycle, we offer a Zoning Code amendment that exceeds the adopted 2022 Title 24 Part 11 Green Building Standards (also referred to as CALGreen). Similar to the All-Electric Municipal Ordinance, this zoning code amendment is not tied to the building code cycle and can be adopted indefinitely. The model code enhances charging accessibility while meeting driver needs, minimizing costs, and allowing for limited exceptions. Dozens of cities adopted a similar model code in 2019 under a CALGreen building code amendment.

This code amendment wi ll be translated into a 2022 CALGreen building code amendment, coming in April 2022.

EV ZONING CODE
Reach Code Support Resources
0 Adoption Tools Cost and Cost Effectiveness
a View Resources a View Resources
Implementation Tools
a View Resources
Item 4

PRESENTATION
Item 4

PRESENTATION
© 2019 Success - Your Efforts Made a Difference
Type
Building
Electric
Preferred
Mostly-Electric
All-Electric
Gas Ban
No Reach
How it works
Allows mixed-fuel buildings with high energy
performance. Electrification-ready panel and wiring
in mixed-fuel buildings.

Water and space heating must be electric,
exemptions for other appliances. Electrification-ready panel and wiring in mixed-fuel buildings.

All appliances must be electric, with very limited
exemptions.

No gas hookup (via municipal ordinance). Limited
exceptions.

Meet state code minimum requirements.

SVCE Members
2 - Milpitas, Monte Sereno
4 - Campbell (res), Los Altos, Los Altos
Hills (res), Saratoga
5 - County of Santa Clara, Cupertino,
Los Gatos (res), Mountain View,
Sunnyvale
1 - Morgan Hill
1 - Gilroy
11 Item 4

PRESENTATION
© 2019 Reach Codes - EV Charging
Type
EV Charging
How it works
More charging infrastructure for a higher
percentage of parking spaces.

SVCE Members
9 - County of Santa Clara, Cupertino,
Los Altos, Los Gatos, Mountain View,
Milpitas, Monte Sereno, Saratoga,
Sunnyvale
12 •
•
•
•
•
•
•
•
•
Item 4

PRESENTATION
© The Adopted 2022 California Building Code
New Construction Energy Code (Part 6)
Electric heat pumps are prescribed for:

Residential HVAC
Nonresidential - most include one or both of water heating and HVAC, depending on building type
Residential
Performance credit for all-electric buildings
Required higher ventilation rate for gas stoves
Pre-wiring required for residential dwellings
Energy storage readiness
Nonresidential - Solar PV and Battery Storage required
13