• Subtitle
New SV Clean Energy
PowerPoint Template
•••
•
•
•
•
Reduce dependence on fossil fuels by providing carbon free, affordable, and reliable electricity and innovative programs for the SVCE community
2022-23 Strategic
Focus Area:
24x7 CLEAN ENERGY:
Explore 24x7 clean energy
delivery at scale,
to improve on the current
100% clean energy goal
•••
•
••
••
•
•
SVCE on track to meet RPS requirements with planned additional procurement in 2023 & will have excess RPS in years beyond 2024 through 2030. 0 500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
2022 2023 2024 2025 2026 2027 2028 2029 2030
Solar + Storage Solar Geothermal Wind VAMO Short Term PCC1 •••••••
Seller Project Name Technology Generation MW
Storage
MW
Approximate %
of Annual load
in 2025 Term (years)
Lifetime Not
to Exceed
Authority
(MM$)
SVCE
Board
Approval Status
1 MN8 Slate Solar + Storage 93.0 46.5 6.7% 17 $198 Oct-18 Online 2 Ormat Casa Diablo Geothermal 7.0 1.4% 10 $43 Feb-20 Online 3 Atlantica Coso Geothermal 43.8 9.6% 15 $331 Mar-20 Online 4 Leeward Rabbitbrush Solar + Storage 40.0 8 3.0% 15 $64 Apr-20 Online 5 NextEra Yellow Pine Solar + Storage 50.0 26 4.1% 20 $128 May-20 Construction 6 Avantus Aratina Solar + Storage 80.0 20 6.6% 20 $174 Jun-20 Pre-construction 7 174 Power Global Atlas Solar 50.0 0 3.8% 10 $27 Jan-21 Pre-construction 8 SB Energy Angela Solar + Storage 20.0 10 1.4% 15 $35 Mar-21 Pre-construction 9 AES Mountain View Wind 62.5 15.625 3% 20 $128 Apr-21 Online 10 Origis San Luis West Solar + Storage 33.5 4% 15 $74 Apr-21 Pre-construction 11 Clearway Victory Pass Solar + Storage 100.0 25 8% 15 $149 May-21 Construction 12 Terra-Gen Cameron Crest Wind 77.7 5% 15 $150 May-21 Online 13 Rev Renewables Tumbleweed Long Duration Storage 14.6 n/a 15 $100 Feb-22 Pre-construction 14 Onward Goal Line Long Duration Storage 14.2 n/a 15 $100 Mar-22 Pre-construction 15 Ormat Geothermal Portfolio Geothermal 16.75 3.3% 20 $256 Jun-22 Pre-construction 16 OME Fish Lake Geothermal 1.82 0.4% 20 $30 Jun-22 In-development •••••••
0%
10%
20%
30%
40%
50%
60%
70%
CP 4 - 2021-2024 CP 5 - 2025-2027 CP 6 - 2028-2030
Actual SB 350 % relative to SVCE Load Minimum LTR Need for SB 350 - (65% of SB 100 Target) •
•
•
•
0 500
1000
1500
2000
2500
3000
3500
4000
4500
5000
2022 2023 2024 2025 2026 2027 2028 2029 2030
RPS - Current Carbon Free - Current Total Green Requirements ••••