Exhibit B - Change Order No. 2

Chino City Council
September 17, 2024

Document
Exhibit B - Change Order No. 2
Meeting
September 17, 2024
Body
Chino City Council
Original file
949 KB
Text extracted from the city's file for reading and search. Open the original on chino.legistar1.com. That file is the official record.

DATE: 2PROJECT:3,195,550.00$ 109,901.00$ LOCATION:923,990.64$ 4,229,441.64$ TO (Contractor):ITEM NO. QUANTITY UNIT UNIT PRICEDECREASE IN CONTRACT PRICE INCREASE IN CONTRACT PRICE 11.00 LS 7,911.33$ -$ 7,911.33$ 21.00 LS 21,940.55$ -$ 21,940.55$ 31.00 LS 26,657.92$ -$ 26,657.92$ 41.00 LS 53,328.84$ -$ 53,328.84$ 51.00 LS 153,162.00$ -$ 153,162.00$ 61.00 LS 28,000.00$ -$ 28,000.00$ 6.1156,000.00 SF 0.88$ -$ 137,280.00$ 6.2156,000.00 SF 2.59$ -$ 404,040.00$ 6.35,130.00 SF 1.49$ -$ 7,643.70$ 6.4100.00 TN 138.00$ -$ 13,800.00$ 6.51.00 LS 24,126.30$ -$ 24,126.30$ 6.620.00 EA 490.00$ -$ 9,800.00$ 6.721.00 EA 300.00$ -$ 6,300.00$ 6.820.00 EA 1,500.00$ -$ 30,000.00$ Remove Conflicting Striping & Install Traffic Striping, Markings, RPMS, and SignsAsphalt Overlay 3" Depth In Two Lifts Full Width From Chino Ave to Schaefer AveRamona Ave at Marigold Water main ReplacementRamona Ave and Dahila Road Water Main ReplacementTraffic Control for Ramona Ave Street Closure Perform Full Width Ground Penetrating Radar On Ramona Ave, From Chino Ave to Schaefer AveCold Mill AC Pavement (3" Depth) Full Width From Chino Ave to Schaefer AveTraffic Control for Ramona Ave Street Repaving From Chino Ave to Schaefer AveRamona Ave at Marigold Street ReconstructionDouble Adjust Utility ManholesDouble Adjust Water Valve Traffic LoopsPave Additional 1.5" Asphalt Deep Grind as makred out by City Representative923,990.64$ NET CHANGE IN CONTRACT PRICE 923,990.64$ -$ .$4,229,441.64thereby isTOTAL CHANGEand the total adjusted contract price to date$3,305,451.00is hereby added to the current contract price of $923,990.64The sum of LOCAL STREET REHABILITATION PROJECT (ST241)
This document shall become an amendment to the contract and all provisions of the contract will apply hereto. This Change Order constitutes a complete and final resolution of all claims of the contract for additional time or additional compensation related to or affected by work that is the subject of this Change Order. Quantities of items other than Lump Sum are not to exceed the amounts indicated.The time provided for completion in the contract is extended by 0 days.

THE CONTRACT IS CHANGED AS FOLLOWS: Project is under budget, therefore, does not require Council approval. PUBLIC WORKS DEPARTMENTCONTRACT CHANGE ORDER9/5/2024CONTRACT NO.: CHANGE ORDER NO.: YORBA AVE STREET IMPROVEMENTS PROJECT (ST233) &Original Contract Amount2024-204Previously Authorized Change Order AmountRAMONA AVE FROM SCHAEFER AVE TO CHINO AVEAuthorized Amount for Current Change OrderAdjusted Contract AmountHARDY AND HARPER, INCDESCRIPTION APPROVED BY:Hye Jin Lee, PEDirector of Public WorksDateProject Manager DateAPPROVED BY:Alberto Espinoza, PECity EngineerDateACCEPTED BY:Marie AyalaContractor NOTE: All workmanship and materials called for by this Change Order shall be fully in accordance with the original Contract Document insofar as the same may be applied without conflict to the conditions set forth by this Change Order. The time for completing the Contract will not be extended unless expressly provided for in the Change Order. This Change Order shall not be considered as such until it has been signed by authorized representatives of the Contractor and the City. Upon final approval, distribution of copies will be made as required.ATTEST:Natalie GonzagaCity ClerkDateAPPROVED BY:Dr. Linda ReichCity ManagerDate DateRECOMMENDED BY:Anthony Flores
DATE: 21.Necessity for change: Yes No2. Yes No3. Yes No4. Yes No5.Has consent of surety been obtained? Yes N/A6. Yes NoYes No7. Yes No CHANGE ORDER NO.:This change reflects the cumulation of field verified changes to the bid quantities. Effect on operation and maintenance costs: Will proposed change alter the project scope?Effect of this change on project contractors?During pothole investigations of the street an 8 inch water main was ruptured at the intersection of Marigold Dr and Ramona Ave during the potholing process. The force of the water main break caused soil heaving and several inches of pavement uplift which needed to be replaced. Additionally, due to concerns with the condition of the aging water main crossing at Dahlia Road and Ramona Ave, the City requested from Hardy and Harper to replace a segment of 8 inch pipe. Lastly, at a community meeting held with the neighboring residents and businesses on July 18, 2024, homeowners brought up concerns about the noise of traffic and overall appearance of the roadway. To mitigate these concerns City staff has requested from Hardy and Harper to rehabilitate Ramona Ave pavement from Chino Ave to Schaefer Ave. Is proposed change an alternate bid?Will this change effect expiration or extent of coverage?If Yes, will the policies be extended? CONTRACT CHANGE ORDER 9/5/2024CONTRACT NO.: 2024-204REQUEST AND JUSTIFICATION FOR CHANGE