Cities Index.
Exhibit A - User Fee Schedule.pdf

Chino City Council
June 17, 2025

Document
Exhibit A - User Fee Schedule.pdf
Meeting
June 17, 2025
Body
Chino City Council
Original file
3.8 MB
Text extracted from the city's file for reading and search. Open the original on chino.legistar1.com. That file is the official record.

Administration
# Service Center # Service Center Name Base Fee/Subcategory Current Fee/Charge Unit Notes Full Cost Subsidy% Suggested Fee Fee4 1 City Code Update Subscriptions Actual Cost Cost Of Printed Update Material NA NA Actual Cost $0 Cost Of Printing Cost Of Printing
2 ADM-09100 City Code Books And Binding (Actual NA NA And Binding $0 Cost) (Actual Cost)
Hearings Requiring More Than One Hour
3 ADM-10100 Administrative Decision Appeal 262.00 Of Staff Time -- Basic Fee Plus Actual $5,406.55 95% $265.00 $3 Costs, Including Hearing Officer
4 For Non-Applicant Filing Appeal 0.00 $5,406.55 100% $0.00 $0 5 ADM-10200 Document Printing Maximum Allowable Actual Cost NA NA Actual Cost $0 Under Public Records Act 6 ADM-10400 Document Certification Fee 17.00 $17.69 4% $17.00 $0 7 ADM-05200 Duplication Of Public Records 0.10 Page Or= To 10 Pages - Free 1st Rpt To Victim - NA NA $0.10 $0 Free (Crime Reports Only) 8 Cost of device CDR 1.00 $1.00 0% $1.00 $0
9 Cost of device Flash Drive 8 GB 5.00 $5.00 0% $5.00 $0 10 Cost of device Flash Drive 16 GB 8.00 $8.00 0% $8.00 $0 11 Cost of device Flash Drive 32 GB 10.00 $10.00 0% $10.00 $0 12 Cost of device Flash Drive 64 GB 13.00 $13.00 0% $13.00 $0 13 Cost of device Flash Drive 128 GB 25.00 $25.00 0% $25.00 $0 14 Cost of device 1 TB External Drive 71.00 $71.00 0% $71.00 $0 Finance
SeNlce Center
# # SeNlce Center Name Base Fee/Subcategory Current Fee/Chara:e Unit Notes Full Cost Subsidy" Suggested Fee Fee4 Deposit Required For Cost Of Meter
FIN-07500 Temporary Hydrant Meter Rental 237.00 Per Rental Replacement And Estimated Water Usage - $298.95 0% $298.00 $61 Residential $900; Commercial $2,000 Deposit Required For Cost Of Meter
2 Temporary Hydrant Meter Rental - Residential 900,00 Deposit Replacement And Estimated Water Usage - NA NA $900.00 $0 Residential $900; Commercial $2,000 Deposit Required For Cost Of Meter
3 Temporary Hydrant Meter Rental - Commercial 2,000.00 Deposit Replacement And Estimated Water Usage - NA NA $2,000.00 $0 Residential $900; Commercial $2,000 4 FIN-07700 Requested Meter Test 228.00 Plus Actual Cost Of Outside Service $275.92 0% $275.00 $47 5 FIN-07800 Water Turn-On Service Fee 39.00 $49.82 2% $49.00 $10 6 FIN-08000 Delinquency Notification Base Fee 5.00 $6.72 11% $6.00 $1 7 FIN-09500 Returned Check Collection Personal Delivery To House 46.00 $58.56 3% $57.00 $11 8 Mailed 24.00 $33.31 10% $30.00 $6
9 Electronic Notice 16.00 $20.82 4% $20.00 $4
10 FIN-09600 Small Claims Hearing Fee 145.00 $160.16 0% $160.00 $15 11 FIN-09700 Reminder/Final Notice Fee 109.00 $120.12 0% $120.00 $11 12 FIN-09800 Small Claims Filing Fee 36.00 $40.04 0% $40.00 $4 13 FIN-10800 After Hours Reconnection Fee 215.00 $317.05 -3% $328.00 $113 14 FIN-11400 Assessment District Liens 571.00 Plus Cost Of Assessment Consultant $670.11 0% $670.00 $99 15 FIN-12200 Pulled Meter Penalty Fee 89.00 $111.19 0% $111.00 $22 16 FIN-12300 One-Day Water Permit 118.00 Plus Usage. Plus Pro-Rated Readiness-To- $150.91 1% $150.00 $32 Serve Charge If Kept Longer Than 1 Day Actual Cost Using Fully- Actual Cost Using Fully
17 FIN-13900 Damage To City Property Burdened Hourly Rates NA NA Burdened Hourly $0 Plus Cost Of Outside Rates Plus Cost Of Service Outside Service
18 FIN-14900 Assessment Dist App Fee Fee 340.00 $387.33 0% $387.00 $47 19 FIN-15100 Escrow Retention Agreement Agreement 665.00 $741.88 0% $741.00 $76 20 Plus Per Month Maintenance Fee 17.00 $18.30 2% $18.00 $1 21 FIN-15800 Special Event Vendor Permit Fee 13.00 $80.08 75% $20.00 $7 22 Developer Paid -Municipal Services Fee 1,433.00 Per Residential Unit NA NA $1,718.00 $285
Per Acre Of Non-
23 Developer Paid -Municipal Services Fee 5,729.00 Residential NA NA $6,871.00 $1,142 Property
Note: 1-2% Subsidy is due to rounding issue
l
• ml
2 3
4 5
6 7
8 9
10 11
12 13
14 15
16 17
18 19
20 21
22 Business License
FIN-04100
FIN-04100A
FIN-04200
FIN-09900
FIN-10700
FIN-10900
FIN-13000
FIN-13005
FIN-13010
FIN-13011
FIN-13015
FIN-15200
FIN-15300
FIN-15401
Service Center Name
Special Event Permit- Major -longer Duration 0
lar er Size Event - Pc Review
Special Event Permit - Minor
S ecial Event Permit - Ex editin Fee
Special Event Flyer Street Notification
Adult-Oriented Business A lication Fee
Adult Entertainer Application Fee
Cit Business Listin
Note: 1-2% Subsidy is due to rounding issue
Base Fee/Subcategory
No Fee
No Hearing
With Hearin
Plus Per Distributor
Fee
Base
Regular A licant
Non-Profit Group: No Fee
Fee
Plus each additional event
Non- rofit rou s- No fee
Fee
Each Additional Previously
A roved Event
Advanced Security Deposit And
City Services Deposit For Actual
Costs Required (Estimated By The
Cit Staff)
Fee
Fee
Fee
Fee
Fee
Cd Or Printout
Current Fee/Charge Notes Full Cost Subsidy" Suaested Fee Fee4 $988.68 100% $0.00 $0
243.00 $988.68 69% $303.00 $60
611.00 Plus Actual Cost For Hearin Officer $1,525.88 50% $763.00 $152

31.00 Base Fee Per $800.82 95% $38.00
$7 Business

7.00 $800.82 99% $8.00 $1
221.00 Minimum Plus Actual Cost Of Police lnvesti ation $197.30 0% $197.00 ·$24

36.00 $40.04 0% $40.00 $4
332.00 Plus Costs For Associated Staff Time; Plus Negotiated $1,228.81 66% $415.00 $83 Rental Fee For Use Of Public Property 191.00 $1,081.66 78% $238.00 $47

0.00 $1,081.66 100% $0.00 $0
1,961.00 $2,136.91 0% $2,136.00 $175
1,961.00 $2,136.91 0% $2,136.00 $175

0.00 $2,136.91 100% $0.00 $0
3,320.00 $3,670.42 0% $3,670.00 $350
1,961.00 $2,136.91 0% $2,136.00 $175
NA NA $0
1,467.00 $1,643.52 0% $1,643.00 $176

18.00 $20.02 0% $20.00 $2
203.00 $206.71 0% $206.00 $3
591.00 $521.04 0% $521.00 -$70
336.00 $272.58 0% $272.00 -$64
145.00 $160.16 0% $160.00 $15
I
Sonla!Cornri Unit
Soedal Business Permit Hearin• - Non-Profit 0.00
Soecial Business Perm it Heari ni:e - Reaular
g g
FIN-041008 Sp@cial Business. Perm it -Advert ising By
Distribution Of Samples Or Handbills
Special Permit Investigation g
DuP.li~ t~ ~IJs.[ne~s Li~ n~~ Cigrtif!cat ~
, ilm Permit Application
Special Business Permit Renewal pp
Special Event Perm it - Ma ier
0 • D
I
g
pp
..
,
p p g
pp
y
•
*
City of Chino

COMMUNITY SERVICES FEES
SERVICE CENTER NAME Unit/Category

ADULT SPORTS PROGRAMS
Women's Soccer Individual fee
Sports Leagues and Tournament Fees Team fee
Forfeit Fee Team fee
Late Registration Fee (Non-Refundable) Team fee
YOUTH SPORTS PROGRAMS 1
ProQrams and Tournament Fees
Late Registration Fee (Non-Refundable)
Jersey Fee***

BATTING CAGES
Token 15 pitches
15 minutes Session
30 minutes Session
60 minutes Session
Team Reservation , 60 minutes Session
SPORTS FACILITY RENTALS (Hourly)
Sports Field Rental StaffinQ Hourly
Resident Youth Team Hourly
Resident Youth Team (1/2 Soccer Field) Hourly
Non-Resident Youth Team Hourly
Non-Resident Youth Team (1/2 Soccer Field) Hourly
Resident Adult Team Hourly
Resident Adult Team (1/2 Soccer Field) Hourly
Non-Resident Adult Team Hourly
Non-Resident Adult Team (1/2 Soccer Field) Hourly
Softball/Baseball Field Prep (2 or more Fields) Each
Softball/Baseball Field Prep (1 Field Only) Each
Soccer Field Prep Each
Tournament Security Deposit Deposit
Ayala Park Synthetic Field Youth-Resident Hourly
Ayala Park Synthetic Field Adult-Resident Hourly
Ayala Park Synthetic Field Youth Non-Resident Hourly
Ayala Park Synthetic Field Adult-Non-Resident Hourly
Commerical Park Rental Permit Fee - Resident Monthly
Commerical Park Rental Permit Fee - Non-Resident Monthly Pitching Mound Rental Daily
Late Payment Processing Fee**** Daily

SPORTS FACILITY MAINTENANCE (HOURLY)
Resident Youth Team (ballfield)
Resident Youth Team (soccer field/stadium)
Non-Resident Youth Team (ballfield)
Non-Resident Youth Team (soccer field/stadium)
Resident Adult Team (ballfield)
Resident Adult Team (soccer field/stadium)
Non-Resident Adult Team (ballfield)
Non-Resident Adult Team (soccer field/stadium)

SPORTS FIELD LIGHTING
Youth Groups Hourly
Youth Groups (2 Qroups per soccer field) Hourly
Adult Groups Hourly
Adult Groups (2 Qroups per soccer field) Hourly

SWIMMING LESSONS
2024 2025 Percent of Direct Cost
Fees Fees Recovery
100%
$32 $35
$25-$400 $25-$400
$55-$70 $55-$80
$15 $25
56%
$5- $150 $5-$150
$10 $10
$10 - $40
100%
$1 .50 $1 .50
$11 $11
$21 $21
$35 $35
$30 $30
100%
$25 $30
$9 $9
$4.50 $4.50
$16 $20
$8 $10
$15 $20
$7.50 $10
$29 $40
$14.50 $20

1.,omraciea ::,erv1ce -
Fees set by
$35 Contracto1

1.,on,raciea ;:,erv1ce -
Fees set by
$50 Contracto1
$97 $100
$350 $500
$43 $45
$46 $50
$55
$60
$200 $200
$300 $300
$50 $50
$25
$1 $2
$2 $3
$2 $3
$3 $4
$1 $2
$2 $3
$2 $3
$3 $4
100%
$18 $18
$9 $9
$22 $24
$11 $12
41%
City of Chino

COMMUNITY SERVICES FEES
SERVICE CENTER NAME Unit/Category
Group Lessons Individual fee
Semi-private Lessons Individual fee
RECREATIONAL SWIMMING Individual fee

SENIOR PROGRAMS
RECREATION CLASSES1
CAMP3
Camp Individual fee/weekly
Camp - Daily Individual/daily

TINY TOT CLASSES
3-days per week Individual fee/6 weeks
2-days per week Individual fee/6 weeks
Enrichment Classes Monthly
COMMUNITY EVENTS4
Corporate ChallenQe Entrv Fee Team fee
Tier 1-Non-Profit Vendor (Food) Individual fee
Tier 1-Non-Profit Vendor Fee (Retail) Individual fee
Tier 1 -Commercial Vendor Fee (Food) Individual fee
Tier 1 -Commercial Vendor Fee (Retail) Individual fee
Tier 1 -Commercial Vendor (Information Booth) Individual fee Tier 2 -Non-Profit Vendor Fee (Food) Individual fee
Tier 2 -Non-Profit Vendor Fee (Retail) Individual fee
Tier 2 -Commercial Vendor Fee (Food) Individual fee
Tier 2 -Commercial Vendor Fee (Retail) Individual fee
Tier 2 -Commercial Vendor (Information Booth) Individual fee Tier 3 -Non-Profit Vendor Fee (Food) Individual fee
Tier 3 -Non-Profit Vendor Fee (Retail) Individual fee
Tier 3 -Commercial Vendor Fee (Food) Individual fee
Tier 3 -Commercial Vendor Fee (Retail) Individual fee
Tier 3 -Commercial Vendor (Information Booth) Individual fee Tier 4 -Non-Profit Vendor Fee (Food) Individual fee
Tier 4 -Non-Profit Vendor Fee (Retail) Individual fee
Tier 4 -Commercial Vendor Fee (Food) Individual fee
Tier 4 -Commercial Vendor Fee (Retail) Individual fee
Tier 4 -Commercial Vendor (Information Booth) Individual fee Non-Profit Vendor (Information Booth) Individual fee
Homemade Craft Vendor Fee Individual fee
1 O' X 1 O' Vendor Canopy Rental Individual fee
MEETING ROOM/FACILITY RENTALS (Hourly)5
Room Set Up Fee Flat
Clean Up Fee - Optional Flat
Deposit Refundable
Custodial Personnel Hourly
Gym Floor Coverage Fee Service fee
Facility Rental - Aoolication ProcessinQ Fee** Flat
Round Tables Rental Each
Group II Rentals
Group -Small room Hourly
Group - Medium room Hourly
Group - Large room Hourly
Group - Double room Hourly
Group - Auditorium Hourly
Group - Kitchen Flat
Group -Gymnasium Hourly
Group Ill Rentals
Group Ill -Small room Hourly

2024 2025 Percent of Direct Cost
Fees Fees Recovery
$72 $72
$109 $109
$2 $2
20%
Various Various
80%
Various Various
100%
$130 $175
$35 $45
100%
$180 $245
$120 $185
$55-$75
$750 $900
$90 $105
$65 $80
$145 $175
$105 $135
$65 $90
$60 $75
$45 $60
$90 $115
$65 $90
$40 $60
$30 $40
$25 $35
$65 $85
$45 $65
$30 $45
$20 $25
$15 $20
$40 $50
$30 $40
$20 $25
$15 $20
$35 $40
$20 $25
$35-$65 $35-$65
$55- $265 $55- $265
$250 $250
$45 $45
$70 $80
$25 $35
$15 $15
35%
$15 $20
$20 $25
$25 $30
$35 $40
$40 $45
$25 $30
$50 $55
100%
$35 $40

SERVICE CENTER NAME
Group Ill - Medium room
Group Ill - Large room
Group Ill - Double room
Group Ill - Auditorium
Group Ill - Kitchen
Group Ill - Gymnasium
Group IV Rentals
Group IV - Small room
Group IV - Medium room
Group IV - Large room
Group IV - Double room
Group IV - Auditorium
Group IV - Kitchen
Group IV - Gymnasium
Group V Rentals
Group V - Small room
Group V - Medium room
Group V - Large room
Group V - Double room
Group V - Auditorium
Group V - Kitchen
Group V - Gymnasium
Alcohol Deposit
Security Guard
Partner Universities/Colleges
Monday - Thursday Rentals
Friday - Sunday Rentals

PICNIC PAVILION RENTALS
Deposit - (up to 100 people)
Deposit - ( 1 01 + people)
(50 people or less)
(51-100 people)
(101-199 people)
(200+ people)
Bouncer
AFTER SCHOOL RECREATION6
Monthly
Monthly -Low/Moderate Income Qualified

TEEN PROGRAMS
Monthly
Shuttle Fee
TRIPS & TOURS 7
Excursion Fee

OTHER FEES
Replacement Jersey/T-Shirt Fee
Resident CounselinQ Fee
Non-Resident Individual Counseling
Non-Resident Program Fee 8
Staff Fee
PC 1000
Choices
City of Chino

COMMUNITY SERVICES FEES
Unit/Category
Hourly
Hourly
Hourly
Hourly
Flat
Hourly
Hourly
Hourly
Hourly
Hourly
Hourly
Flat
Hourly
Hourly
Hourly
Hourly
Hourly
Hourly
Flat
Hourly
Deposit
Hourly/per guard
Hourly
Hourly
Refundable deposit
Refundable deposit
Daily
Daily
Daily
Daily
Service fee
Individual fee
Individual fee
Individual fee
Individual fee/monthly
Per trip
Individual fee
Hourly
Hourly
Individual fee
Hourly
Individual fee/16 weeks
Individual fee/52 weeks
2024
Fees
$45
$60
$70
$95
$35
$70
$50
$65
$75
$95
$140
$60
$90
$65
$75
$85
$105
$150
$60
$100
$500
$40
$26
$37
$50
$100
$75
$115
$150
$190
$30
$150
$60
$7
$30
Actual Cost
$5-$40
$10
$30
$10
$25
,-ee ;:,e1 uy
San Bernardino
County
i-ee ;,et oy
San Bernardino
County
2025 Percent of Direct Cost
Fees Recovery
$50
$65
$75
$100
$40
$75
100%
$55
$70
$80
$100
$145
$65
$95
$70
$80
$90
$110
$155
$65
$105
$500
$45
$26
$37
100%
$50
$100
$80
$120
$155
$195
$30
70%
$170
$80
10%
$8
$50
100%
Actual Cost
$5-$40
$15
$35
$10
$35
,-ee ;:,e1 uy
San Bernardino
Count)
i-ee ;,et oy
San Bernardino
Count)
City of Chino

COMMUNITY SERVICES FEES
SERVICE CENTER NAME Unit/Category
Sunrise Kids (before school care ) Individual/weekly fee Open Gym - Adult Resident Individual fee
Open Gym - Adult Non-Resident Individual fee
Open Gym - Youth Non-Resident Individual fee
Gym Monthly Membership Individual fee
Gym Identification Card Fee Individual fee
Chino Store Products Per Item
Street Banner Fee Group fee
City BBQ Rental Fee Group fee
Citv BBQ Rental Fee - 2 day period Group fee
Skate Park Rental Hourly
Skate Park Deposit Refundable
Refund Processing Fee Per Activity/Per Participant
Senior Programs Refund Processing Fee Per Activity/Per Participant Family Campout Family of 4
Family Campout - Additional Campers (Maximum 2) Individual

HEAL THY CHINO
Healthy Chino Programs Individual tee
Community Garden -Key Plot Deposit Deposit
Community Garden Plot Rental Fee Yearly
Chino Youth Museum Events , Programs and
Merchandise
Boxing Events , Programs and Merchandise
Notes:
2024
Fees
$70
$2
$3
$1
$27
$5
$1 -$100
$150
$100
$175
$150-$1,000
$350
$5
$2
$5-$60
$20
1 Refund Policy: Refunds/Credits will only be issued before the second class/program/sport meeting. 2 Youth Boxing: Under 18 or current high school student 2025
Fees
$75
$3
$4
$1
$27
$5
$1 -$100
$165
$100
$175
$150 -$1,000
$500
$5
$2
$70 -$100
$10
$5-$60
$25
$25-$75
r��� ��• Uj
the Chino Youtt
Museum Board 01
Directors
r �w��,uy
the Chino Youtt
Boxing Board o
Directors
3 Camp: Fees are non-refundable. Fees are transferable based on availability. Transferring weekly fees must be made by the 4 Community Events Tiers
Tier 1: 4,000+ attendees
Tier 2: 1,000 - 3,999 attendees
Tier 3: 1 - 1,000 attendees
Tier 4: Consecutive Weeks Event
5 Meeting Room/Facility Rental Classification Definitions and Cancellation policy Group I - City of Chino and City of Chino Service Clubs (charged only the staff time when applicable) Group II - City of Chino non-profits including churches and community groups Group Ill - City of Chino residents, non-resident non-profits including churches and community groups Group IV - Non-resident private rentals and residentcommercial use Group V - Non-resident commercial
Cancellation of reservation 30+ days from date of event, flat fee of $30 Cancellation of reservation 14-30 days from date of the event, 50% of the fees are refundable.

Cancellation of reservation less than 14 days from date of the event, fees are non-refundable.

Percent of Direct Cost
Recovery
100%
5%
6 After School Recreation: Transfers, credits, and refunds are only available if requested by the Friday prior to the registered week. Fees are 7 Trips and Tours: Refunds and credits are issued only if a requested cancellation can be filled from the wait/ist. 8 Excluding Recreational Swimming, Sports Field Rentals, After school, Meeting Room Rentals, and track. *Cancellations must be submitted in writing. Cancellation of reservation 30 days from permit date, 100% of fees are refundable.

Cancellation of reservation 14-29 days from permit date, 50% of fees and deposit are refundable. Cancellation of reservation 13 days from permit date, fees and deposit are non-refundable.
** A non-refundable application fee of $25 will be applied to every facility rental request, except from those user groups that are exempt as specified in the facility reservation policy. This fee will be collected at the time of application submittal. Sports Facilities Rentals are excluded from this fee.
*** Non-refundable once jersey order is placed.
**** Up to 7 days. If not paid, permit will be cancelled.

Parking Fines
# Description Current Fee/Charge Full Cost Subsidy% Suggested Fee Fee4 1 Municipal Code Violations
2 10.28.030(b) - Stop/Park In Yellow or Green Zones, Painted 35.00 Curb or Posted Sign NA NA $35.00 $0 3 10.28.050 - Stop/ Park in Parkway 35.00 NA NA $35.00 $0 4 10.28.060(a) - Stop/Park within Divisional Island Unless 35.00 NA NA $35.00 $0 Indicated by Signs/Markings 5 10.28.060(d) - No Parking Zone/Red Paint or Posted Sign 35.00 NA NA $35.00 $0 6 10.28.060(f) - Stop/Park Creating a Traffic Hazard 35.00 NA NA $35.00 $0 7 10.28.060(g) - Temporary No Parking/Posted 24 Hours in 35.00 Advance NA NA $35.00 $0 8 10.28.060(h) - Within 20 feet of X-Walk/lntersection/Business 35.00 NA NA $35.00 $0 Dist. when Posted or Red Curb Except at Bus Stop 9 10.28.065 - No Parking on Specified Streets during Specified 35.00 NA NA $35.00 $0 Days (street sweeping) 10 10.28.090(a)(1) - Unlawful to Park Except: Diagonal Parking 35.00 Within Markings NA NA $35.00 $0 11 10.28.090(a)(2) - Unlawful to Park Except: Diagonal 35.00 NA NA $35.00 $0 Parking/Right Front Wheel 6" from Curb 12 10.28.100 - One Way Street/Parking on Left Side 35.00 NA NA $35.00 $0 13 10.28.llO(b) - Emergency No Parking Signs 35.00 NA NA $35.00 $0 14 10.28.120(b) - No Parking Signs Are Adjacent to School/ When 35.00 Posted NA NA $35.00 $0 15 10.28.130 - No Longer Than 2hr Parking/Between 7am-6pm, 35.00 except Sundays & Holidays NA NA $35.00 $0 16 10.28.140(b) - Parking on Narrow Street/Roadway Width Less 35.00 NA NA $35.00 $0 Than 20 feet / When Posted 17 10.28.150 - Stop/Park in Any Alley 35.00 NA NA $35.00 $0 18 10.28.160 - Park for Sale or Advertising on Street 35.00 NA NA $35.00 $0

Parking Fines
# Description Current Fee/Charge Full Cost Subsidy% Suggested Fee Fee4 19 10.28.170 - Parking for Auto Repairs or Greasing, on Highway 35.00 NA NA $35.00 $0 20 10.28.180(a) - Park/Vending from Vehicle or Pushcart/Excess 35.00 NA NA $35.00 $0 of 10 Minutes
21 10.28.190 - Parking Excess of 72 Hours/on Highway 50.00 NA NA $50.00 $0 22 10.29.0G0(j) - Permit Parking Only: 1st Violation 50.00 NA NA $50.00 $0 23 10.29.0G0(j) - Permit Parking Only: 2nd Violation 150.00 NA NA $150.00 $0 24 10.29.0G0(j) - Permit Parking Only: 3rd Violation 250.00 NA NA $250.00 $0 25 10.30.030(a) - Park Commercial Veh. on Public/Private 50.00 NA NA $50.00 $0 Prop./Excess of 3 hrs, 10,000lbs: 1st Violation within one year 26 10.30.030(a) - Park Commercial Veh. on Public/Private 100.00 NA NA $100.00 $0 Prop./Excess of 3 hrs, 10,000lbs: 2nd Violation within one year 27 10.30.030(a) - Park Commercial Veh. on Public/Private 250.00 NA NA $250.00 $0 Prop./Excess of 3 hrs, 10,000lbs: 3rd Violation within one year 28 10.30.030(b) - Store Commercial Veh. on Private Residential 50.00 NA NA $50.00 $0 Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 1st Violation

10.30.030(b) - Store Commercial Veh. on Private Residential 29 Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 2nd 100.00 NA NA $100.00 $0 Violation within one year

10.30.030(b) - Store Commercial Veh. on Private Residential 30 Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 3rd 250.00 NA NA $250.00 $0 Violation within one year
31 10.30.030(c) - Park Trailer or Semi-trailer on Public/Private 50.00 NA NA $50.00 $0 Prop./Excess of 3 hrs, 10,000lbs: 1st Violation
Parking Fines
# Description Current Fee/Charge Full Cost Subsidy% Suggested Fee Fee4 32 10.30.030(c) - Park Trailer or Semi-trailer on Public/Private 100.00 NA NA $100.00 $0 Prop./Excess of 3 hrs, 10,000lbs: 2nd Violation within one year 33 10.30.030(c) - Park Trailer or Semi-trailer on Public/Private 250.00 NA NA $250.00 $0 Prop./Excess of 3 hrs, 10,000lbs: 3rd Violation within one year

10.30.030(d) - Store Trailer or Semi-trailer on Private 34 Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 50.00 NA NA $50.00 $0 1st Violation

10.30.030(d) - Store Trailer or Semi-trailer on Private 35 Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 100.00 NA NA $100.00 $0 2nd Violation within one year

10.30.030(d) - Store Trailer or Semi-trailer on Private 36 Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 250.00 NA NA $250.00 $0 3rd Violation within one year

10.30.030(e) - Stopped, Standing, or Parked, Commercial 37 Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for 50.00 NA NA $50.00 $0 a Consecutive Period of 6 hrs, 10,000lbs: Deemed abandoned. 1st Violation

10.30.030(e) - Stopped, Standing, or Parked, Commercial 38 Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for 100.00 NA NA $100.00 $0 a Consecutive period of 6 hrs, 10,000lbs: Deemed abandoned. 2nd Violation within one year

10.30.030(e) - Stopped, Standing, or Parked, Commercial 39 Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for 250.00 NA NA $250.00 $0 a consecutive period of 6 hrs, 10,000lbs: Deemed abandoned. 3rd Violation within one year
40 10.30.040 - Parked Vehicle for Sale on Commercially Zoned 50.00 NA NA $50.00 $0 Prop/Excess of 2 hours: 1st Violation

Parking Fines
# Description Current Fee/Charge Full Cost Subsidy% Suggested Fee Fee4 41 10.30.040 - Parked Vehicle for Sale on Commercially Zoned 100.00 NA NA $100.00 $0 Prop/Excess of 2 hours: 2nd Violation within one year 42 10.30.040 - Parked Vehicle for Sale on Commercially Zoned 250.00 NA NA $250.00 $0 Prop/Excess of 2 hours: 3rd Violation within one year 43 10.32.060(a)(l) - Stop/Park in Commercial Loading Zone 35.00 Exceeding 20 mins NA NA $35.00 $0 44 10.32.060(b)(l) - Stop/Park in Passenger Loading Zone 35.00 Exceeding 3 mins NA NA $35.00 $0 45 10.32.070 - Park Yellow Zone for Loading or Unloading of 35.00 NA NA $35.00 $0 Passengers or Mata rials 46 10.32.080 - Stop/Park Yellow Zone/Excess of 3 mins/ Other 35.00 NA NA $35.00 $0 Than to Load or Unload 47 10.32.090 - Stop/Park in Alley/See 10.28.060 for Time Limits 35.00 NA NA $35.00 $0 48 10.44.010 - Parked Off a Truck Route/10,000lbs Gross Vehicle 100.00 NA NA $100.00 $0 Weight Or More 49 10.44.015 - Unattached Trailer or Semi-Trailer 100.00 NA NA $100.00 $0 so Vehicle Code Violations Fine*
51 4000a - Expired Registration 75.00 NA NA $75.00 $0
52 5204(a) - No Tabs 75.00 NA NA $75.00 $0
53 21113(a) Unauthorized Parking on School or Public Grounds 35.00 NA NA $35.00 $0 54 21211(b) Park/place Bike Vehicle in Bike Path 75.00 NA NA $75.00 $0 55 22500a- Vehicle Parked Within Intersection 35.00 NA NA $35.00 $0 56 22500b - Vehicle Parked on Crosswalk 35.00 NA NA $35.00 $0 57 22500c - Vehicle Parked Adjacent to Safety Zone 35.00 NA NA $35.00 $0 58 22500d - Vehicle Parked Within 15ft of Fire Station Driveway 35.00 NA NA $35.00 $0 59 22500e - Vehicle Blocking Driveway 35.00 NA NA $35.00 $0 60 22500f - Vehicle Parked on a Sidewalk 35.00 NA NA $35.00 $0

Parking Fines
# Description Current Fee/Charge Full Cost Subsidy% Suggested Fee Fee4 61 22500g - Vehicle Blocking Excavation 35.00 NA NA $35.00 $0 62 22500h - Double Parking 35.00 NA NA $35.00 $0
63 22500i - Vehicle Parked in Posted Bus Loading Zone 35.00 NA NA $35.00 $0 64 22500k - Vehicle Parked on Bridge or Tunnel 35.00 NA NA $35.00 $0 65 22500.1 - Parked In Fire Lane 75.00 NA NA $75.00 $0
66 22502a - 18 Inches From Curb / Wrong Way 35.00 NA NA $35.00 $0 67 22505 - Park on State Highway/when Posted 35.00 NA NA $35.00 $0 68 22507.8(a) - Handicap Disabled Only 300.00 NA NA $300.00 $0 69 22507.8(b) - Block or Obstruct Disabled Stall/Space 300.00 NA NA $300.00 $0 70 22507.8(c)(2) - Block or Obstruct Disabled Stall/Space 300.00 NA NA $300.00 $0 71 22514 - Within 15ft of Fire Hydrant 50.00 NA NA $50.00 $0 72 22515 - Unattended Running Vehicle 35.00 NA NA $35.00 $0 73 22516 - Vehicle Locked with Person Who Can't Escape 35.00 NA NA $35.00 $0 74 22517 - Door Open to Traffic 50.00 NA NA $50.00 $0
75 22520 - Stopping on a Freeway 35.00 NA NA $35.00 $0
76 22521 - Parked Within 7.5ft of Rail Road 75.00 NA NA $75.00 $0 77 22522- Parking Within 3ft of Sidewalk Access Ramp 75.00 NA NA $75.00 $0 78 22526a- Grid Lock 75.00 NA NA $75.00 $0

Parking Fines
# Description Current Fee/Charge Full Cost Subsidy% Suggested Fee 79 County Code Violations
80 CC 53.064a - Failed to Park In Stall 13.50 NA NA $13.50 81 CC 53.064b - Failed to Comply with Signs/Directions 13.50 NA NA $13.50 82 CC 53.064c - Failed to Park in Designated Lot/Stalls 13.50 NA NA $13.50 83 CC 53.064d - Parked to Cause Obstruction/ Hazard 13.50 NA NA $13.50 84 CC 53.065 - 15mph or Posted Speed Limit 13.50 NA NA $13.50 85 CC 52.0119 - Parked in Excess of 72 hours 28.50 NA NA $28.50 *Plus State/County Surcharge of $12.50 when applicable, per County GC 76000(b) and State GC Sec. 70372(b) and 76000.3 1st Penalty Late Charge $25.00 at 32 days
2nd Penalty Late Charge $25.00 at 62 days
Delinquent Citation sent to DMV at 63 days
3rd Penalty Late Charge $25.00 at 92 days

Fee4
$0
$0
$0
$0
$0
$0
Police
Service Center Current
# # Service Center Name Base Fee/Subcategory Fee/Charge Unit Notes Full Cost Subsidy% suaested Fee Fee4 1 PERMITTED TOW SERVICE DPERATOR FEE SCHEDULE
This fee is for up to one hour of services performed, inclusive 2 Initial tow service 227.00 of one driver and one light duty tow vehicle. This fee is NA NA At Contract Rate NA retained by the tow service operator.

This fee is for additional time after the initial hour of the tow service or a second driver and tow vehicle, if needed for a 3 Additional hourly labor rate 206.00 complicated tow or scene, at the request of a police NA NA At Contract Rate NA department employee. This fee is retained by the tow service operator.

This fee is for storage of a stored or impounded vehicle at the 4 Daily outside storage* 47.00 tow providers storage yard, including the initial day of the NA NA At Contract Rate NA towed vehicle.

This fee is for the storage of a stored or impounded vehicle at 5 Daily inside storage* 54.00 the tow providers storage yard, including the initial day of the NA NA At Contract Rate NA towed vehicle.

This fee is authorized in the event of a vehicle release after 6 After hours tow yard release 103.00 the normal, posted business hours of a tow service operator. NA NA At Contract Rate NA This fee is retained by the tow service operator.
7 P0-04210 Special Permit (Id Badge) 27.00 $70.59 4% $68.00 $41 8 P0-04300 Bicycle Registration Fee (Set at $3) 3.00 Fee Set By State NA NA $3.00 $0 9 P0-04500 Parking Enforcement Fines .. Set By City Resolution/Bail Schedule, Plus State/County Surcharges NA NA .. $0
10 P0-04600 Vehicle Inspection 38.00 $40.51 1% $40.00 $2 11 P0-04650 Vin Verification 51.00 $53.46 1% $53.00 $2
12 P0-05100 False Alarm Response (In A 12-Month Period From Fourth Response and Subsequent 65.00 July 1-June 30) . $169.09 12% $149.00 $84 13 P0-05260 Subpoena Duces Tecum Processing Photocopy 0.10 Page $0.10 0% $0.10 $0 14 Postage Actual Cost NA NA Actual Cost $0
15 Prod & Oeliv 6.00 Qtr.Hr. $6.00 0% $6.00 $0
16 On-Site Records 15.00 $15.00 0% $15.00 $0
17 8 GB Flash Or 5.00 $5.00 0% $5.00 $0
18 128 GB Flash Or 25.00 $25.00 0% $25.00 $0
19 1 TB External Or 71.00 $71.00 0% $71.00 $0
20 lCO-R 1.00 $1.00 0% $1.00 $0
21 64 GB Flash Or 13.00 $13.00 0% $13.00 $0
22 16 GB Flash Or 8.00 $8.00 0% $8.00 $0
23 32 GB Flash Or 10.00 $10.00 0% $10.00 $0
24 P0-05300 Local Criminal History Record (Set At $25) Application 25.00 $42.48 41% $25.00 $0 25 P0-05400 Fingerprint Service 30.00 Plus State/County Fees For All Other Applicants $34.84 2% $34.00 $4 26 P0-05500A Clearance Letter/Records Check Abe Letter 64.00 $74.57 1% $74.00 $10 27 P0-05500B Clearance Letter/Records Check Passport Letter 13.00 $14.44 3% $14.00 $1 28 P0-05800 Special Parking Permit Permit 19.00 $21.24 1% $21.00 $2 29 P0-05900 Parade Services (Actual) City Or School District Sponspored Events $0* NA NA so• $0 30 P0-05900 Parade Services Other Applicants Actual Cost Of City Services NA NA Actual Cost Of City SO Services
31 P0-11000 Dui Response Actual Cost Not To Exceed $10,000 NA NA Actual Cost $0 32 P0-11800 Department Of Justice Permit - Pawn & Second 163.00 Hand Dealer Shops $148.36 0% $148.00 -$15 33 P0-11900 Vehicle Release Fee No Fee For Victim 0.00 NA NA $0.00 $0 34 Other Than Victim Plus Towing Fee 215.00 $214.74 0% $214.00 -$1

II II
Police
Service Center Current
# # Service Center Name Base Fee/Subcategory Fee/Charge Unit Notes 35 PD-13300 Repossessed Vehicle Fee (Set by State statute at 15.00 Fee Set By Statute At $15 $15) 36 PD-13800 Truancy/Curfew Fee 55.00 Plus Hourly Rate For Officer 37 PD-15700 Firearm Storage Fee First Gun 216.00
38 PD-15700 Firearm Storage Fee Second Gun Plus 90.00
* The tow service operator shall transmit one-half of all storage fees collected to the Police Chief and retain one-half of such fees as compensation for its storage services, and shall remit the balance at the end of each month to the city (CMG 5.36.130 F) Note: 1-2% Subsidy is due to rounding issue
Full Cost Subsidy% suaested Fee Fee4
NA NA $15.00 $0
$60.29 0% $60.00 $S
$219.22 0% $219.00 $3
$93.90 1% $93.00 $3
Deveopment Services
Service Center Current
# # Service Center Name Base Fee/Subcategory Fee/Charge Unit Notes Full Cost Subsidy% Suggested Fee Feell 1 05-00810 Tentative Tract Map Base Fee 8,091.00 $9,821.05 0% $9,821.00 $1,730 2 Plus Per Lot 16.00 $20.48 2% $20.00 $4
3 05-00820 Tentative Parcel Map Base Fee 6,080.00 $8,886.23 0% $8,886.00 $2,806 4 Plus Per Lot 16.00 $20.48 2% $20.00 $4
5 05-0llOOa Env.Review-Mnd,Nd, Addendum (Mitigated Negative Declaration,Negative 5,621.00 Declaration, Addendum) $5,368.87 0% $5,368.00 -$253 6 05-0llOOb Env.Review - Eir 10,164.00 $10,894.38 0% $10,894.00 $730 7 05-01700 General Plan Update 0.05% of the job valuation NA NA 0.05% $0 8 05-01710 General Plan Amendment-Map Change 6,517.00 $9,120.44 0% $9,120.00 $2,603 9 05-01720 General Plan Amendment-Text Change 6,008.00 $8,027.15 0% $8,027.00 $2,019 10 05-01750 Specific Plan Amendment Review 7,859.00 $9,864.16 0% $9,864.00 $2,005 11 05-01800 Special Conditional Use Permit Only - Commercial/Industrial 4,698.00 $7,491.30 0% $7,491.00 $2,793 12 05-01800 Special Conditional Use Permit Only - Residential/Owner Occupied (68% Subsidy) 1,504.00 $7,222.60 0% $7,222.00 $5,718 13 05-01850 Special Conditional Use Permit And Site Approval Concurrently 10,372.00 $12,384.80 0% $12,384.00 $2,012 14 05-01860 Developer Modification - Scup 3,641.00 $5,271.20 0% $5,271.00 $1,630 15 05-01900 Variance Fee 4,205.00 $5,443.65 0% $5,443.00 $1,238 16 Residential Applicant 210.00 $5,443.65 96% $234.60 $25 17 05-01950 Admin Review-Residential W/O Dre 283.00 $769.98 0% $769.00 $486 18 05-01955 Admin Review-Residential W/O Dre Time Extension 198.00 $580.44 0% $580.00 $382 19 05-01960 Admin Review-Commercial Or Industrial With Dre Review 3,765.00 $5,018.31 0% $5,018.00 $1,253 20 05-01961 Developer Modification Of Admin Review-Comm/Ind. With Dre Review 2,199.00 $3,195.96 0% $3,195.00 $996 21 05-01970 Admin Review-Commercial Or Industrial Without Dre Review 1,918.00 $2,361.33 0% $2,361.00 $443 22 05-01971 Developer Modification Of Admin Review-Comm/Ind. Without Dre Review 1,022.00 $1,321.93 0% $1,321.00 $299 23 05-02000 City Council Appeal Processing - Non-Resident Applicant Appealing A Planning 3,667.00 Commission Decision $4,806.33 0% $4,806.00 $1,139 24 05-02000 City Council Appeal Processing - Resident Applicant Appealing A Planning 0.00 Commission Decision $4,806.33 75% $1,201.00 $1,201 25 05-02010 Planning Commission Appeal Processing - Non-Resident Applicant Appealing A 4,919.00 Decision Regarding Development $6,443.98 0% $6,443.00 $1,524 26 05-02010 Planning Commission Appeal Processing - Resident Applicant Appealing A Decision 0.00 Regarding Develooment $6,279.94 75% $1,569.00 $1,569 27 05-02015 SB18/AB52 472.00 $730.44 0% $730.00 $258
28 05-02100 Development Time Extension-Administrative 1,270.00 $1,929.26 0% $1,929.00 $659 29 05-02110 Development Time Extension -Discretionary 1,724.00 $2,462.01 0% $2,462.00 $738 30 05-02300 Zone Change Review 7,252.00 $10,033.15 0% $10,033.00 $2,781 31 05-02320 Pre-Zone With Annexation 12,190.00 Fee Plus Lafco Fees $14,014.14 0% $14,014.00 $1,824
32 05-02400 Zoning Ordinance Amendment 4,601.00 $6,288.44 0% $6,288.00 $1,687 33 05-02410 Zoning Verification 168.00 $253.28 0% $253.00 $85 34 05-02500 Sign Review 300.00 $398.31 0% $398.00 $98
35 05-02550 Sign Program Review 901.00 $1,601.47 0% $1,601.00 $700 36 05-02600 Site Approval Review - When Applied For Separately 8,730.00 $11,104.34 0% $11,104.00 $2,374 37 05-02610 Master Site Approval Review - The Preserve/College Park 5-20 Acres 2,369.00 $8,782.67 0% $8,782.00 $6,413 38 21- 125 Acres 4,742.00 $9,725.84 0% $9,725.00 $4,983 39 126 & Above 12,665.00 $14,876.73 0% $14,876.00 $2,211 40 05-02700 Sign Ordinance Amendment 6,699.00 $7,837.23 0% $7,837.00 $1,138 41 05-02800 Sign Ordinance Variance 2,860.00 $3,398.04 0% $3,398.00 $538 I
Deveopment Services
Service Center
# # Service Center Name Base Fee/Subcategory
42 DS-02900 Development Agreement Processing
43 DS-02910 Development Agreement Annual Compliance Review 44 DS-03000 Preliminary Project Review
45 DS-03100 Developer Modification Request For Site Approval 46 DS-03101 Developer Modification Request For Site Approval/Scup -Admin Review 47 DS-03131 Developer Modification Request For Subdivision 48 DS-03132 Developer Modification - Condition Of Approval 49 DS-03140
Covenants, Conditions & Restrictions (Cc&R) Review
50 DS-03200 Agricultural Preserve Withdrawal
51 DS-03300 Agricultural Contract -Partial Notice Of Non-Renewal 52 DS-03310 Agricultural Contract-Notice Of Non-Renewal 53 DS-03320 Agricultural Contract Cancellation
54 DS-03600 Special Agreement To Assist Development
55 DS-03660 Model Home Agreements
56 DS-10000 Mobile Home Annual Registration Per Space
57 DS-10001 Mobile Home Premium Hearing Application
58 DS-10600 Abandoned Vehicles
Base Plus Actual Cost Of
59 DS-11700-710 Landscaping/Lighting/Wall Plan Review Outside Consultant For Construction Plans
Base Plus Cost Of Outside
60 Landscaping/Lighting/Wall Plan Review Consultant For Conceptual Plans/Minor Administrative
Landsca e Review
61 Landscape Revision
62 DS-15001 Temporary Banner Permit
63 DS-15500 Design Review Board-The Preserve & College Park Base 64 DS-15804 Public Notice For Project Entitlements-Developer (Plus Actual Mailing Costs) Base Fee 65 No Fee For Residential
Applicant
66 DS-15805 Collection Container Permit
67 DS-15806 Collection Container Renewal Permit
68 DS-15807 Collection Container Replacement Permit Sticker 69 Verbatim Minutes Management Assistant (FBHR
+Time)
Current
Fee/Charge
Actual Cost
Actual Cost
3,998.00
6,752.00
1,223.00
2,786.00
1,758.00
454.00
2,091.00
1,571.00
1,571.00
3,589.00
Actual Cost
Actual Cost

20.00 4,436.00
102.00
916.00
165.00
New

40.00 2,673.00
129.00

0.00 188.00

18.00 38.00
New

Unit
Flat Rate
Notes
City Attorney
And Staff nme
City Attorney
And Staff nme
Plus Actual Cost
Of City Attorney
Review
Plus Outside
Costs
Plus Outside
Costs
Plus Outside
Costs
Plus Outside
Costs
Plus Towing Fee
Plus Actual Staff
Time ForDRB
Plus Actual
Notice And
Mailing Cost
Full Cost Subsidy% Suggested Fee Feell
NA NA Actual Cost $0
NA NA Actual Cost $0
$4,010.13 0% $4,010.00 $12
$8,533.72 0% $8,533.00 $1,781
$2,421.39 0% $2,421.00 $1,198
$4,250.29 0% $4,250.00 $1,464
$2,368.78 0% $2,368.00 $610
$1,087.35 0% $1,087.00 $633
$2,424.88 0% $2,424.00 $333
$2,007.29 0% $2,007.00 $436
$2,047.41 0% $2,047.00 $476
$4,397.24 0% $4,397.00 $808
$0.00 NA Actual Cost $0
NA NA Actual Cost $0
$22.93 4% $22.00 $2
$5,162.24 0% $5,162.00 $726
$123.36 0% $123.00 $21
$1,155.94 0% $1,155.00 $239
$543.96 0% $543.00 $378
$543.96 0% $543.00 NA
$106.04 62% $40.00 $0
$3,388.28 0% $3,388.00 $715
$302.04 0% $302.00 $173
$230.56 100% $0.00 $0
$273.57 0% $273.00 $85
$45.23 1% $45.00 $27
$72.12 0% $72.00 $34
$401.27 0% $401.00 NA
II I
70 71
72 73
74 75
76 77
78 Note:

Deveopment Services
Service Center
# Service Center Name
Sign Program Review PC Approval
Design Guideline Review Fee
Administrative Fee Residential with DRC Review
Home Occupation Permit
SB9 Administrative Lot Splits (Tentative Parcel Map)
SB330 Application Review
Sign Program Revision
Document Recordation
Art in Public Places
1-2% Subsidy is due to rounding issue
Expedite Fee: 100% surcharge on all fees
Base Fee/Subcategory
Current
Fee/Charge Unit
New
New
New
New
New
New
New
New
New

charged same as DS-01950 "Residential
w/o DRC" $283
Notes Full Cost Subsidy% Suggested Fee Feell
$2,275.28 0% $2,275.00 NA
$6,470.55 0% $6,470.00 NA
$1,244.52 0% $1,244.00 NA
$241.66 0% $241.00 NA
$3,474.77 0% $3,474.00 NA
$2,059.38 0% $2,059.00 NA
$457.68 0% $457.00 NA
$120.66 1% $120.00 NA
NA NA 0.1% of Total Building NA Permit Valuation
Deveopment Services
Current
# Service Center# Service Center Name Base Fee/ Fee/Charge Unit Notes Full Cost Subsidy" Suggested Fee Fee4 1 DS-00110 Building Permit/ Inspection !Plus 7% Technology Fee) Actual Cost Of Building Most Recent Version Of Uniform Administrative Code NA NA Actual Cost $0 Permit Fee 2 DS-00110 Electrical Permit/ Inspection !Plus Technology Fee= 7% Of Actual Cost Of Building Most Recent Version Of Uniform Administrative Code NA NA Actual Cost $0 Electrical Permit Fee) Permit Fee DS-00110 Mechanical Permit/ Inspection !Plus Technology Fee= 7% Of Actual Cost Of Building Most Recent Version Of Uniform Administrative Code NA NA Actual Cost $0 Mechanical Permit Fee) Permit Fee 4 DS-00110 Plumbing Permit/ Inspection !Plus Technology Fee= 7% Of Actual Cost Of Building Most Recent Version Of Uniform Administrative Code NA NA Actual Cost $0 Plumbin Permit Fee) Permit Fee Fee Set
By Sb
1473,
DS-00120 Green Building Standards (Cbsc Fee) Based
On Actual Cost NA NA Actual Cost $0
Building
Valuatio
n
To Cover Cost Of Plan Check And Title 24 Energy Calculations, As Well As 6 DS-01200 Building Plan Review 75% Of Building American Disability Act Requirements. For Plan Check On Plans For Housing NA NA 75% $0 Permit Fee Tracts With Model Homes, 75% Of Building Fee For Each Individual Model And 35% Of Building Fee For Each Additional Residential Unit 7 DS-03900 S ecial Permit Buildin Ins ection 191.00 $245.69 0% $245.00 $54 8 DS-03905 68.00 $81.50 1% $81.00 $13
9 DS-13600 270.00 $568.50 0% $568.00 $298
10 DS-15801 Solar Panel - Residential Base Fee 520.00 Plus $15 Per Kw For Each Kw Above 15 Kw (Capped at $450) $647.00 30% $450.00 -$70 11 DS-15802 Solar Panel - Non-Residential, 0-250Kw Base Fee 879.00 Plus $7 Per Kw Between SlKw And 250Kw (Ca ed at $1,000) $1,074.41 16% $900.00 $21 12 DS-15803 Solar Panel - Non-Residential, Above 250Kw Base Fee 1,000.00 Plus $5 Per Kw Above 250 Kw $1,563.24 36% $1,000.00 $0 13 DS-15808 796.00 $1,003.45 0% $1,003.00 $207
14 DS-15809 1,107.00 $1,371.44 0% $1,371.00 $264
15 DS-15810 -Lar e Pro· ect 1,636.00 $2,018.08 0% $2,018.00 $382 16 Technology Fee 7% Of Building 12% 39% 7.5% 0.5% Permit Fee 17 Inspections outside of normal business hours 119.70 per hour (minimum charge -- two hours) $246.12 0% $246.00 $126 "'* Or the total hourly cost to the jurisdiction, whichever is greatest. This cost 18 Re-inspection fee assessed under CBC Section C.B.C 79.80 per hour shall include supervision, overhead, equipment, hourly wages and fringe $246.12 0% $246.00 $166 benefits of the em lo ees involved.
19 Additional plan review required by changes, additions or revisions 100.76 per hour (minimum charge -- one hour) $164.04 0% $164.00 $63 to a roved lans Note:

Expedite Fee: 100% surcharge on all fees
S ecial Ins ction Re istration
Legat Address Change
Building Valuation Table
Current (All New Construction)
1 500 25.00 25.66 0.00
501 2,000 25.00 25.66 2.00
2,001 25,000 45.00 46.19 9.00
25,001 50,000 252.00 258.68 6.50
50,001 100,000 414.50 425.49 4.50
100,001 500,000 639.50 656.45 3.50
500,001 1,000,000 2,039.50 2,093.56 3.00
1,000,001 + 3,539.50 3,633.32 2.00
Percent Change = 3%
Cost Recovery Level = 100%

0.00 0

2.05 100

9.24 1,000

6.67 1,000

4.62 1,000

3.59 1,000

3.08 1,000

2.05 1,000
Minimum Maximum Current Base Suggested Base Current Suggested Value Value Rate Rate Plus $$ Plus $$ For every
Servk:eCenter CUm,nt
• • Servk:e Center Name Base Fee/Subcatesory Fee/Otara:e Unit ..... Fl.Ill Cost ... ...,,, .. _ ..... New Unit If needed .... 1 PW-00510 Grading Plan-Roughs (Maximum 3 Plan Checks) Minimum For S To 10 Acres 2,312.00 $860.24 0% $860.00 Per Sheet Variable 2 PW-00520 Grading Plan Check (Maximum 3 Plan Checks) Base Fee For First 10 Acres 2,312.00 NA NA NA Variable 3 Plus For Each Additional 5 Acres 664.00 NA NA NA Variable 4 PW-00530 Grading Plan Check-Precise (Maximum 3 Plan Checlks) Base Fee First Acre 1,174.00 $1,220.90 0% $1,220.00 Per Sheet Variable 5 Plus Additional Acre Or Portion Thereof, Up To 10 Acres 245.00 NA NA NA Variable 6 PW-00540 Grading Plan Check-Precise (Maximum 3 Plan Checks) Base Fee First 10 Acres 3,378.00 NA NA NA Variable 7 Plus Each Additional 5 Acres 700.00 NA NA NA Variable 8 PW-00550 Grading Inspection-Rough Base Fee First 5 Acres 729.00 $2,464.36 0% $2,464.00 $1,735 9 Plus Each Additional 5 Acres 295.00 $158.07 0% $158.00 -$137 10 PW-00560 Grading Inspection-Precise- 0 To 10 Acres Base Fee First Acre 797.00 $6,679.65 0% $6,679.00 $5,882 11 Plus Each Additional Acre Or Portion Thereof, Up To 10 Acres 126.00 $105.38 0% $105.00 -$21 12 PW-00570 Grading Inspection-Precise- Greater Than 10 Acres Base Fee First 10 Acres 1,934.00 $7,733.48 0% $7,733.00 $5,799 13 Plus Each Additional 5 Acres 567.00 $105.38 0% $105.00 -$462 14 PW-00590 Preliminary & Final Hydrology Study Review Base Fee First 3 Acres 1,386.00 $2,202.21 0% $2,202.00 $816 15 Plus Every Acre Or Portion Thereof Above 3 Acres 487.00 $326.70 0% $326.00 -$161 16 PW-00592 Erosion Control Plan Review (Maximum 3 Plan Checks) Base Fee First 5 Acres 294.00 $1,208.39 0% $1,208.00 $914 17 Plus Each Additional 5 Acres Or Portion Thereof 166.00 $174.85 0% $174.00 $8 18 PW-00594 Geotechnical Soil Report Review 1,548.00 $1,444.59 0% $1,444.00 -$104 19 PW-00910 Final Subdivision Map-Tract (Maximum 3 Plan Checks) Base Fee 4,153.00 $6,452.30 0% $6,452.00 $2,299 20 Plus Per Lot 70.00 $62.68 1% $62.00 -$8
21 PW-00920 Final Subdivision Map-Parcel (Maximum 3 Plan Checks) First Lot 3,553.00 $4,832.30 0% $4,832.00 $1,279 22 Plus Per Lot 70.00 $62.68 1% $62.00 -$8
23 PW-01321 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 $0 To $25,000 1,991.00 Plus 7.7% Of Amount> $10,000 Plan Checksl $2,312.97 0% $2,312.00 Plus 10.8% Of Amount > $321 $10,000 24 PW-01322 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 $25,001 To $75,000 3,749.00 Plus 3% Of Amount> $25,000 Plan Checksl $3,935.55 0% $3,935.00 Plus 5.2% Of Amount> $186 $25,000 25 PW-01323 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 $75,001 To $125,000 6,330.00 Plus 2.5% Of Amount> $75,000 Plan Checksl $6,537.78 0% $6,537.00 Plus 5.1% Of Amount> $207 $75,000 26 PW-01324 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 $125,001 To $200,000 8,666.00 Plus 2.4% Of Amount> $125,000 Plan Checksl $9,078.99 0% $9,078.00 Plus 4.9% Of Amount> $412 $125,000 27 PW-01325 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 $200,001 And Above 11,063.00 Plus 1.3% Of Amount> $200,000 Plan Checksl $12,747.70 0% $12,747.00 Plus 1.5% Of Amount > $1,684 $200,000 28 PW-01340 Inspection Of Residential Driveway 245.00 $452.72 0% $452.00 $207 29 PW-01341 Inspection Of Commercial Driveway 424.00 $670.34 0% $670.00 $246 30 PW-01342 Inspection Of Utility Service Cut Less Or Equal To 5'X20' 198.00 $398.17 0% $398.00 $200 31 PW-01343 Inspection Of Sidewalk Less Than 150 Sq.Ft 159.00 $292.78 0% $292.00 $133 32 PW-01344 Simple Inspection-Traffic Control 49.00 $450.08 0% $450.00 $401 33 PW-01400 Revision Of Engineering Plans 777.00 $981.86 0% $981.00 $204 Actual
34 PW-01500 Traffic Impact Analysis Review Cost/FBHR
Assigned Staff
NA NA Actual Cost/FBHR $0 Assigned Staff
Actual
35 PW-01550 Traffic Control Plan Review (Maximum 3 Plan Checks) Cost/FBHR Assigned Staff
NA NA Actual Cost/FBHR $0 Assigned Staff
36 PW-01600 Public/Private Improvement Inspection 599.00 Minimum Plus 4.8% Of The Estimated Value Of Construction $896.23 0% $896.00 $297 37 PW-03400 Right-Of-Way (R.O.W.) Encroachment 185.00 $480.96 0% $480.00 $295 38 PW-03401 Right-Of-Way (R .. O.W.) Encroachment Permit Extension Request 111.00 Fee $126.38 0% $126.00 $15 39 PW-03402 New Dedication of R-0-W (Actual) $2,100 depost is collected upfront and the remaining Actual Costs amount is refunded if anv. NA NA Actual Cost/FBHR $0 Assi,med Staff 40 PW-03410 Newsrack Permit 115.00 Per Publication
One Time Fee $134.35 0% $134.00 $19
41 PW-03420 Right-Of-Way (R.O.W.) Encroachment - Minor 53.00 $282.97 0% $282.00 $229 Current Fees As Allowed By State And Actual Cost For
42 PW-03500 Wide/Overweight Vehicle Permit Additional Plan Checking And Inspection For Excessive Loads Actual Costs NA NA Actual Costs $0 ($90 annual, $16 single trip I
43 PW-03610 lot Line Adjustment (Flat fee) 1,293.00 $2,052.39 0% $2,052.00 $759 44 PW-03630 Deeds Of Right-Of-Way/Easement/Summary Vacation (Maximum 918.00 $2,200.59 0% $2,200.00 $1,282 Ill
Servk:eCenter
• • Servk:e Center Name Base Fee/Subcatesory
45 PW-03700 Detour/Lane Closure Permit
46 PW-03800 Survey Monument Restoration Base Fee Plus Cost Of Licensed Surveyor 47 PW-11200 After Hours Inspection Actual Costs Using Fully Burdened Rates 48 PW-13210A Public Utility/Public Agency Inspection-Value less Than $1,000 49 PW-13210B Public Utility/Public Agency Inspection-Value Between $1,001 And Base $100,000 so PW-13220 Public Utility/Public Agency Inspection-Value Greater Than Base $100,000 51 PW-15600 Preliminary & Final Water Quality Management Plan Review First 5A cres 52 Plus Each Additional 5 Acres
53 PW-10010 Small Wireless Facility Application Each Application 54 PW-10011 Sewer Annexation Application Each Application 55 c; Attorne /Le al Review For Public Im rovement reements 56 General Vacation of Right-of-Way
57 Certificate of Correction
58 Traffic Sign Bagging/Unbagging
59 Center Line Ties/Land Surveyor
60 Road Closure Permit Policy 1-10 days; Up to $100,000 Value of Work Being Completed 61 Road Closure Permit Policy 10-30 days; $100,001 - $500,000 Value of Work Being Com leted
62 Road Closure Permit Policy 31-90 days; $500,001 - $1,000,000 Value of Work Being Com leted
63 Road Closure Permit Policy 91-180 days; $1,000,001 - $3,000,000 Value of Work Being Com leted
64 Road Closure Permit Policy Over 180 days; Over $3,000,001 Value of Work Being Com leted
65 Refundable Deposits Public lmprovements/Monumentation 66 Bond Substiituition
67 Sewer Study
NOTE:

Additional fees may be assessed at City discretion if plan check exceeds three rounds of review 1-2% Subsidy is due to rounding issue
Expedite Fee: 100% surcharge on all fees
CUm,nt
Fee/Otara:e Unit
157.00
626.00
Actual Costs
385.00
385.00
6,012.00
1,568.00
519.00
555.00
485.00
New er hr
New
New
New each request
New
per sheet plus
20% Admin fee
20,000.00 refundable
30,000.00
60,000.00
100,000.00
300,000.00 deposit
New
refundable
deposit
New
New
. ....

Plus 3.3% Of Construction Cost
Plus .8% Of The Cost Over
$100,000
minimum 1 hour
$1,000 per day rate
$1,500 per day rate
$2,000 per day rate
$3,000 per day rate
$5,000 per day rate
Fl.Ill Cost ... ...,,, .. _ ..... New Unit If needed .... $305.09 0% $305.00 $148
$274.97 0% $274.00 -$352
NA NA Actual Costs $0
$652.42 0% $652.00 $267
$746.46 0% $746.00 $361
$3,327.97 0% $3,327.00 -$2,685
$3,409.62 0% $3,409.00 $1,841
$411.04 0% $411.00 -$108
$612.55 0% $612.00 $57
$534.78 0% $534.00 $49
$385.91 0% $385.00 NA
$2,898.01 0% $2,898.00 NA
$699.68 29% $500.00 NA
$208.84 0% $208.00 NA
$604.76 0% $604.00 NA
NA NA $20,000.00 $0.00
NA NA $30,000.00 $0.00
NA NA $60,000.00 $0.00
NA NA $100,000.00 $0.00
NA NA $300,000.00 $0.00
NA NA $1,000.00 NA
NA NA $2,749.00 NA
NA NA Actual Cost consultant, NA
lclus 15% Adm In
Public Works
Service Current
# Center# Service Center Name Base Fee/Subcategory Fee/Charge Unit Notes Full Cost Subsidy% Suggested Fee Fee4 City Installed, Jumper Included
1 PW-07600 Water Meter Installation Plus Cost Of Meter For 3/4" To 1" Meters 394.00 $487.20 0% $487.00 $93
City Installed, No Jumper Plus
2 Cost Of Meter For 1 1/2" To 2" 371.00 $469.91 0% $469.00 $98 Meters
Developer Installed, No Jumper
3 Plus Cost Of Meter For Meters 267.00 $344.94 0% $344.00 $77 Larger Than 2"
Plus Meter Cost
{Customer
Responsible
4 PW-07610 Water Meter Downsize Or Upgrade 208.00 For Meter $392.40 20% $312.00 $104 Installation
Greater Than
2")
5 PW-07900 Delinquent Processing Charge Fee 138.00 $188.31 0% $188.00 $50 6 Fee If Meter Lock Has Been 62.00 $74.17 0% $74.00 $12 Tampered With Fee If Water Valve Has Been
7 Tampered With Plus Cost Of The 536.00 $748.05 0% $748.00 $212 Valve
8 PW-08100 Sewer Stoppage Investigation 41.00 $695.91 91% $61.00 $20 9 PW-08200 Sewer Dye Test 89.00 $600.83 78% $133.00 $44 10 PW-08300 Industrial User Discharge Permit--Application 105.00 $410.68 62% $157.00 $52 11 PW-08310 Industrial User Discharge Permit Processing-Significant 260.00 $622.92 37% $390.00 $130 Discharger 12 PW-08311 Industrial User Discharge Permit Processing-Class I & II 204.00 $296.59 0% $296.00 $92 13 PW-08315 Industrial User Discharge Permit Processing-Non-Discharger 114.00 $170.70 0% $170.00 $56 14 PW-08320 Industrial User Discharge Inspection-Significant Discharger 293.00 $551.36 20% $439.00 $146 15 PW-08325 Industrial User Discharge Inspection-Class I 157.00 $404.79 42% $235.00 $78 16 PW-08326 Industrial User Discharge Inspection-Class II 164.00 $404.79 39% $246.00 $82 17 PW-08327 Industrial User Discharge Inspection-Non-Discharger 112.00 $358.81 53% $168.00 $56 Base Fee If Performed By City
18 PW-08333 Industrial User Discharge Permit-Sampling Staff; Actual Cost If Processed By 162.00 $377.48 36% $243.00 $81 Contract Company
19 PW-08344 Industrial User Discharge Permit Modification 170.00 $280.35 9% $255.00 $85 Plus Cost Of
20 PW-08350 Industrial Permit Sample Analysis Base Fee 50.00 Outside $357.63 Laboratory 86% $50.00 $0 Work

Public Works
Service Current
# Center# Service Center Name Base Fee/Subcategory Fee/Charge Unit Notes Full Cost Subsidy% Suggested Fee Fee4 21 PW-12500 Fire Hydrant Flow Test Field Test 218.00 $463.72 14% $399.00 $181 22 PW-12550 Backflow Device Penalty Field Test 251.00 $344.11 0% $344.00 $93 23 PW-15601 Water Quality Management Plan Inspection 104.00 $524.05 70% $156.00 $52 24 PW-15610 Industrial User Wastewater Enforcement/ Investigation 173.00 $388.55 33% $259.00 $86 25 PW-15620 Storm Water Inspection 85.00 $377.48 66% $127.00 $42 Plus Max
Allowed By
26 PW-04700 Graffiti Vandalism Cost Recovery 7.00 Per Sq. Ft. Court For $343.73 97% $12.00 $5 Police
Investigation
27 Grease interceptors waivers for food service establishments New $315.26 0% $315.00 NA Note: 1-2% Subsidy is due to rounding issue

ENGINEERING COST ESTIMATE
Unit Item

STREETS
EA Tree Removal
CY Concrete Removal
CY AC Pavement Removal
CY Imported Common Fill (Incl. Compaction)
SF Preparation of Subgrade, Sidewalk and Paving
LF PCC 8" Curb & 24" Gutter on 6" AB
LF PCC 6" Curb & 24" Gutter on 6" AB
LF PCC Curb Only
LF 8" A.C. Berm
SF 8" PCC Cross Gutter on 6" AB
SF 4" PCC Sidewalk
SF 6" PCC Thick Drive Approach on 6" AB
SF 8" PCC Thick Drive Approach on 6" AB
LF 2" x 6" Redwood Header
EA Street Sign and Post
EA Traffic Sign and Post
EA Reflector Sign and Post
EA Painted Legend
SF Prime or Tack Coat
TON AC Variable - <300T
TON AC Variable - >300T
TON CAB Variable - <300T
TON CAB Variable - >300T
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit
Price
880.00
358.00
110.00

37.00 1.10

29.00 26.00

22.00 22.00

18.00 6.40

13.75 16.50

8.25 523.00
440.00
193.00

7.00 0.09
143.00
132.00
110.00

99.00 I
- - I

ENGINEERING COST ESTIMATE
Unit Item

STREETS
EA Adjust Sewer Manhole to Grade
EA Adjust Sewer Cleanout to Grade
EA Adjust Water Valve and Can to Grade
EA Street Light (City Owner)
EA Electrical Pedestal
EA Lot Monument Setting Fee
LF Sawcut A.C.

LF Sawcut Concrete
SF Cold Plane A.C. 2" Thick
LF Signing & Striping for
Arterial
Collector
Local
EA Traffic Signal (8 - Phase Controller)
EA Modify existing Traffic Signal per Quadrant
LF Chain Link Fence
4 foot Residential Grade (Add $7.00/LF for Removal of
Existing Fence)
6 foot School fence (Add $9.00/LF for Removal of
Existing Fence)
EA Utility Poles
Transmission
Distribution
Service
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit
Price
1,045.00
550.00
578.00
8,470.00
7,150.00
605.00

3.30 3.30

0.31 21.00

14.00 8.00
385,000.00
82,500.00

28.00 39.00
12,650.00
8,800.00
3,300.00

ENGINEERING COST ESTIMATE
Unit Item

STREETS
Landscape (Including shrubs, Hardscape, Irrigation, Ground Cover, Lighting, Installation Labor and Connection to
SF Existing Systems)
14 foot Median with Landscape, Irrigation, Lighting,
LF Hardscape, Curb, Gutter & Pavement
Rail Road Crossing
Safety Equipment (Complete Including Crossing Gates,
LS Signs, and Lights)
SF Track Crossing (Concrete)
SF Approach
EA S.W. Ramps (AD.A. Compliant)
EA Traffic Signal Loops

STREETS

STREET SUBTOTAL
LS Mobilzation (5% of Construction Cost)
LS Traffic Control (5% of Construction Cost)
LS Clear & Grub Site (5% of Construction Cost)
LS Excavation (Clean Material) (5% of Construction Cost)

GRAND TOTAL STREETS ONLY
$
$
$
$
$
$
$
Unit
Price

17.00 330.00
550,000.00
193.00

4.40 4,400.00
660.00
5%
5%
5%
5%
I
II

ENGINEERING COST ESTIMATE
Unit Item
WATER
LF Trench Support/Shoring (6 foot depth)
CY Pipe Bedding & Compaction (Imported)
6" Pipe & Fittings Installed, including excavation, bedding, LF backfill and pavement restoration
8" Pipe & Fittings Installed, including excavation, bedding, LF backfill and pavement restoration.
12" Pipe & Fittings Installed, including excavation, bedding, LF backfill and pavement restoration
18" Pipe & Fittings Installed, including excavation, bedding, LF backfill and pavement restoration
LF Removal, Disposal of ACP and Backfill
EA 6" Gate Valve
EA 8" Gate Valve
EA 12" Gate Valve
EA 18" Gate Valve
EA Fire Hydrant Assembly per City Std.

EA Blow-off Assembly 4" per City Std.

EA 2" Air Relief Assembly
EA 1" Water Service/Meter
EA 2" Water Service/Meter
WATER

WATER SUBTOTAL
LS Mobilzation (5% of Construction Cost)
LS Traffic Control (5% of Construction Cost)

GRAND TOTAL WATER ONLY

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit
Price

17.00 99.00

88.00 110.00
149.00
193.00
165.00
2,200.00
2,860.00
4,950.00
8,250.00
8,250.00
9,460.00
4,950.00
3,850.00
4,950.00
5%
5%
I
I
I
I \
I

ENGINEERING COST ESTIMATE
Unit Item

RECYCLED WATER
LF Trench Support/Shoring (6 foot depth)
CY Pipe Bedding (Imported)
6" Pipe & Fittings Installed, including excavation, bedding, LF backfill and pavement restoration
8" Pipe & Fittings Installed, including excavation, bedding, LF backfill and pavement restoration.
12" Pipe & Fittings Installed, including excavation, bedding, LF backfill and pavement restoration
18" Pipe & Fittings Installed, including excavation, bedding, LF backfill and pavement restoration
EA 6" Gate Valve
EA 8" Gate Valve
EA 12" Gate Valve
EA 18" Gate Valve
EA Fire Hydrant Assembly per City Std.

EA Blow-off Assembly 5" per City Std.

EA 2" Air Relief Assembly
EA 1" Water Service/Meter
EA 2" Water Service/Meter

RECYCLED WATER

RECYCLED WATER SUBTOTAL
LS Mobilzation (5% of Construction Cost)
LS Traffic Control (5% of Construction Cost)

GRAND TOTAL RECYCLED WATER ONLY

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit
Price

17.00 99.00

88.00 110.00
149.00
193.00
2,200.00
2,860.00
4,950.00
8,250.00
8,250.00
9,460.00
4,950.00
3,850.00
4,950.00
5%
5%
I
I
I
I \
I

ENGINEERING COST ESTIMATE
Unit Item
SEWER
LF Trench Support/Shoring
4" Installed, including excavation, bedding, backfill and LF pavement restoration
8" Installed, including excavation, bedding, backfill and LF pavement restoration
10" Installed, including excavation, bedding, backfill and LF pavement restoration
12" Installed, including excavation, bedding, backfill and LF pavement restoration
15" Installed, including excavation, bedding, backfill and LF pavement restoration
18" Installed, including excavation, bedding, backfill and LF pavement restoration
21" Installed, including excavation, bedding, backfill and LF pavement restoration
24" Installed, including excavation, bedding, backfill and LF pavement restoration
EA Sewer Saddle
EA Wyes 4" x 8" Typical
EA 48" Sewer Manhole
EA 60" Sewer Manhole
EA Sewer Cleanout
SEWER

SEWER SUBTOTAL
LS Mobilization (5% of Construction Cost)
LS Traffic Control (5% of Construction Cost)

GRAND TOTAL SEWER ONLY
$
Unit
Price

17.00 $83.00
$102.00
$113.00
$135.00
$157.00
$179.00
$212.00
$229.00
$495.00
$248.00
$5,170.00
$8,250.00
$1,980.00
5%
5%
I
I
I J
I

ENGINEERING COST ESTIMATE
Unit Item

STORM DRAIN
LF 24" X 36" C.M.P.A. (10 Gauge)
LF 27" x 43" C.M.P.A (10 Gauge)
EA Storm Drain Manhole #1
EA Junction Structure #2 (24" or larger)
EA Junction Structure #4 (24" or smaller)
EA Outlet Structure
EA Catch Basin 3.5' Width
EA Catch Basin 7' Width/LO.

EA Catch Basin 1 O' Width/LO.

EA Catch Basin 14' Width/LO.

EA Catch Basin 21' Width/LO.
18 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
24 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
27 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
30 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
33 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
36 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
39 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
42 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
45 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
48 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
54 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
60 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit
Price
253.00
275.00
11,000.00
9,735.00
4,400.00
7,700.00
7,920.00
8,690.00
10,945.00
12,100.00
14,300.00
220.00
264.00
286.00
308.00
325.00
341.00
352.00
363.00
396.00
424.00
484.00
550.00

ENGINEERING COST ESTIMATE
Unit Item

STORM DRAIN
66 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
72 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
78 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
84 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
90 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
96 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
102 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
108 inch RCP Installed, including excavation, bedding,
LF backfill and pavement restoration
7' x 6' RCB Installed, including excavation, bedding, backfill LF and pavement restoration
7' x 8.5' RCB Installed, including excavation, bedding, LF backfill and pavement restoration
7' x 9.5' RCB Installed, including excavation, bedding, LF backfill and pavement restoration
8' x 11' RCB Installed, including excavation, bedding, backfill LF and pavement restoration
8' x 13' RCB Installed, including excavation, bedding, backfill LF and pavement restoration
9' x 9' RCB Installed, including excavation, bedding, backfill LF and pavement restoration
9' x 12' RCB Installed, including excavation, bedding, backfill LF and pavement restoration
4' x 6' RCB Installed, including excavation, bedding, backfill LF and pavement restoration

STORM DRAIN

STORM DRAIN SUBTOTAL
LS Mobilization (5% of Construction Cost)
LS Traffic Control (5% of Construction Cost)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Unit
Price
616.00
688.00
759.00
842.00
913.00
1,012.00
1,100.00
1,183.00
770.00
902.00
957.00
1,100.00
1,210.00
1,100.00
1,210.00
748.00
5%
5%
-
I

← All documents from this meeting