Those persons wishing to speak on any item included on the agenda, or on any matter within the subject matter jurisdiction of the City Council, are invited fill out and submit to the City Clerk a “Request to Speak” form (name and address optional) which is available at the entrance to the Council Chambers. Additionally, members of the public may submit electronic public comments to [email protected] no later than 4:00 p.m. on the day of the meeting. In your email, please include the meeting date, agenda item you are commenting on, and your comment. All comments received by the deadline will be forwarded to the City Council for consideration before action is taken on the matter and will be entered into the record for the meeting specified in email received.
If you require a reasonable accommodation to participate in this meeting per your rights under the Americans with Disabilities Act or for any other reason, please contact the City Clerk’s Office (909) 334-3306, at least 48 hours prior to the advertised starting time of the meeting.
Any documents produced by the City and distributed to a majority of the City Council regarding any item on this agenda will be made available in the City Clerk’s Office during normal business hours at City Hall located at 13220 Central Avenue, Chino. In addition, such documents will be posted on the City’s website at www.cityofchino.org.
CHINO CITY COUNCIL
SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY
CITY HALL COUNCIL CHAMBERS
13220 CENTRAL AVENUE
CHINO, CA 91710
TUESDAY, DECEMBER 2, 2025
REGULAR MEETING
AGENDA
CLOSED SESSION – 5:00 PM
OPEN SESSION – 6:00 PM
_________________________________________________________________________________
ROLL CALL
Mayor Eunice M. Ulloa, Mayor Pro Tem Curtis Burton, Council Member Karen C. Comstock, Council Member Christopher Flores, Council Member Marc Lucio.
CLOSED SESSION PUBLIC COMMENTS
This is the time and place for the general public to address the City Council about the closed session items. Ordinance No. 97-08 (Chino Municipal Code Section 2.04.090) limits speakers to no more than five (5) minutes in which to address the Council, except as provided under Government Code 54954.3(b)(2).
CLOSED SESSION
1. CONFERENCE WITH REAL PROPERTY NEGOTIATOR Pursuant to Government Code 54956.8 Property: APN: 1014-281-04; NEC of Central & Francis Ave., Chino; Agency Negotiator: Linda Reich, City Manager or her designee; Negotiating Parties: Dave Kuo; Under Negotiation: Price and Terms of Potential Acquisition
2. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Pursuant to paragraph (1) of subdivision (d) of Government Code Section 54956.9 Name of case: Mary Ingrid Culp vs. City of Chino; (Case No. CIVSB2222717) 1 CHINO CITY COUNCIL
DECEMBER 2, 2025 2
3. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Pursuant to paragraph (1) of subdivision (d) of Government Code Section 54956.9 Name of case: G.M., A Minor By and Through Tanya Baez vs. City of Chino; (Case No.
CIVRS2508042)
4. CONFERENCE WITH LABOR NEGOTIATOR Pursuant to Government Code Section 54957.6:
Agency Negotiator: Terry Doyle, Director of Human Resources/Risk Management Employee or her designee Organizations: Chino City Hall Confidential Employee Association; Chino Police Management Association (CPMA); Chino Police Officers Association (CPOA); Chino Police Professional Employees Association (CPPEA); Teamsters Local1932 Professional, Technical and Clerical Unit; American Federation of State, County, and Municipal Employees (AFSCME District Council 36 - Local 3183); Unrepresented Management Sworn and Professional; Executive Management and Deputy Directors; and Part-time Employees
FLAG SALUTE
PERFORMANCE BY THE CHINO VALLEY COMMUNITY CHORUS
CEREMONIALS
Presentations
Boy’s Republic - Della Robbia Wreath Presentation.
2025 Sports Legends Youth Volunteer Award Winner - Recognition of the 2025 Sports Legends Volunteer Award Winner, Courtney Garcia, Chino American Little League, for service to youth sports in the Chino community.
Business of the Month - Award of Business of the Month for December 2025 to:
- Royalty Cakes
- Sokol Elite Gymnastics
Mayor’s Home Beautification Award - Award of Mayor’s Home Beautification Award for December 2025.
REPORT OUT OF CLOSED SESSION
AGENDA ADDITIONS/REVISIONS
PUBLIC ANNOUNCEMENTS
This is the time and place for the Mayor to inform the public of all upcoming events and past occurrences of communitywide interest and concern.
PUBLIC COMMENTS
This is the time and place for the general public to address the City Council about subjects that do not appear elsewhere on the agenda. Due to Council policy and Brown Act requirements, action will not be taken on any issues not on the Agenda. Ordinance No. 97-08 (Chino Municipal Code Section
2.04.090) limits speakers to no more than five (5) minutes in which to address Council, except as provided under Government Code 54954.3(b)(2). If more than three (3) persons seek to address the same agenda item or the same subject matter, the Mayor shall establish a maximum period of time not to exceed thirty (30) minutes.
2 CHINO CITY COUNCIL
DECEMBER 2, 2025 3
CONSENT CALENDAR
At this time, members of the public may present testimony as to why an item should be removed from the Consent Calendar for separate discussion. Unless a member of the public or City Council requests that an item be removed from the Consent Calendar, all items will be acted upon as a whole and by one vote. Items placed on the Consent Calendar represent routine expenditures and/or actions that support ongoing City operations.
1. Warrants. Approve expenses as audited and within budget for warrants 7773100 to 7773337, and Electronic Fund Transfers 525349E to 525456E, totaling $7,934,495.06.
2. Minutes. Regular Meeting Minutes for November 18, 2025 (All Members Present).
3. Elected City Officials’ Report Regarding Travel, Training, and Meetings. Receive and file the Elected City Officials’ Report reflecting City Council business related expenses incurred by the City.
4. City Council Regular Meeting Cancellation. Authorize staff to cancel the January 6, 2026 City Council Regular Meeting.
5. Replacement Subdivision Improvement Agreement for Tract Map No. 16420-6 (Block 11 - Lots 2 & 3) - Lennar Homes of California, LLC. Approve replacement Subdivision Improvement Agreement for Tract Map No. 16420-6 (Block 11- Lots 2 & 3), generally located south of Legacy Park Street, east of Main Street, and west of East Preserve Loop.
6. Replacement Subdivision Improvement Agreement for Tract Map No. 16420-6 (Block 11 - Lot 9) - Richmond American Homes of Maryland, Inc. Approve replacement Subdivision Improvement Agreement for Tract Map No. 16420-6 (Block 11- Lot 9), generally located south of Legacy Park Street, east of Main Street, and west of East Preserve Loop.
NEW BUSINESS
7. Award of Contract - Citywide HVAC Preventative Maintenance and Repairs. Award a Public Works contract with C.E. Mechanical, Inc., Chino, CA for Citywide HVAC Preventative Maintenance and Repairs.
Staff Report By: Andrea Bauer, Assistant Parks and Facilities Manager RECOMMENDATION: 1) Award a contract with C.E. Mechanical Inc., Chino, CA for Citywide Heating Ventilation Air Conditioning (HVAC) Preventative Maintenance and Repairs in the amount of $476,000 for preventative maintenance and $900,000 for repairs for a total not-to-exceed contract amount of $1,376,000 for two and one-half years through June 30, 2028, and two additional one-year options to renew; 2) appropriate $75,000 to the Building Management Fund; and 3) authorize the City Manager to execute all necessary documents on behalf of the City.
8. Cooperative Agreement with the California Department of Transportation (Caltrans) for the relinquishment of State Route 83 (Euclid Avenue). Authorize the City Manager to execute a Cooperative Agreement with Caltrans for the relinquishment of State Route 83 (Euclid Avenue).
Staff Report By: Michelle Chapman, CIP Engineering Manager 3 CHINO CITY COUNCIL
DECEMBER 2, 2025 4
RECOMMENDATION: 1) Adopt Resolution No. 2025-090, authorizing the City Manager to execute Agreement No. 08-1799 (Relinquishment Agreement) with Caltrans to accept a lump sum payment of $18,823,725 for the transfer of ownership of State Route 83 to the City of Chino; 2) establish a revenue object code within the General Fund for the deposit and project number MS265 for tracking future expenditures; 3) appropriate $60,000 to the Euclid Avenue Program for contract services to secure the transfer of easements on Federal Land for the Euclid Avenue Relinquishment Project MS265; and 4) authorize the City Manager to execute the necessary documents on behalf of the City.
9. Award a Professional Services Agreement to Biggs Cardosa Associates for Environmental and Design Services for the Pine Avenue Connector/Bridge Project (ST261) and grant (G7261).
Award a Professional Services Agreement to Biggs Cardosa Associates for Environmental and Design Services for the Pine Avenue Connector/Bridge Project (ST261).
Staff Report By: Michele Hindersinn, Senior Engineer
RECOMMENDATION: 1) Award a professional services agreement to Biggs Cardosa Associates in the amount of $6,964,986.99 for Environmental and Design Services for the Pine Avenue Connector/Bridge Project (ST261); 2) appropriate $2,086,590.28 from the Citywide Development Impact Fee (Fund 220), establish a new grant project G7261 and appropriate $3,505,806.71 to the Transportation Fund (Fund 320) for utilizing SAFETEA-LU grant funds and appropriate $1,372,590.00 to Measure I Arterial (Fund 328) (backfill from Fund 220) for a total project appropriation amount of $6,964,986.99 and a revised total project budget for Project ST261 and G7261, in the amount of $7,014,986.99; and 3) authorize the City Manager to execute all necessary documents on behalf of the City.
10. Amendment to the Construction Reimbursement Agreement for the Ontario Ranch Business Park Project (referred to as the REDA Project) - Merrill Avenue Widening, Interconnect, and Euclid Avenue Median Improvements Project R2501. Approve an amendment to the Construction Reimbursement Agreement for the Merrill Avenue Widening, Interconnect, and Euclid Median Improvements.
Staff Report By: Sylvia Ramos, Contracts & DIF Administrator and Jesus Plasencia, Assistant City Engineer
RECOMMENDATION: 1) Approve a budget amendment, as shown in the Fiscal Impact section of this report, reallocating and updating project funding sources for Project R2501 (Merrill Avenue Widening, Interconnect, and Euclid Avenue Median Improvements) to reflect approved change order work and updated cost allocations among appropriate funding sources, and increase the total project budget by $1,983,767, for a revised total project budget not to exceed $17,692,868; 2) appropriate $2,322,542 to the Transportation Fund 320 with a back fill from the Citywide Circulation Development Impact Fee Fund 220 to support the revised project budget and reduce the Preserve Fund 260 budget by ($338,775); 3) approve an amendment to the Construction Reimbursement Agreement between the City of Chino and Euclid Land Venture, LLC, a Delaware limited liability company, increasing the reimbursement amount by $1,983,767 for a total not-to-exceed amount of $17,692,868; and 4) authorize the City Manager to execute all the necessary documents on behalf of the City.
11. Construction Contract - CJ Concrete Construction, Inc. for the CDBG Alley Improvements FY2023-24 Project (SN240). Award a Construction Contract to CJ Concrete Construction, Inc. for the CDBG Alley Improvements FY2023-24 Project (SN240).
Staff Report By: Eduardo Diaz, Associate Engineer
4 CHINO CITY COUNCIL
DECEMBER 2, 2025 5
RECOMMENDATION: 1) Approve the plans and specifications for construction as approved by the Director of Public Works and award a construction contract to CJ Concrete Construction, Inc. for the CDBG Alley Improvements FY2023-24 Project (SN240) for $407,955; 2) appropriate $18,521.95 to the Transportation Fund (Fund 320) with a backfill from the General Fund (Fund 100); 3) increase the project budget of the CDBG Alley Improvements FY2023-24 Project (SN240) by $18,521.95 for a revised project budget of $568,146.60; 4) authorize the Public Works Director up to $40,795.50 (10% of the contract amount) for construction contingencies as allowable per the Public Contract Code; and 5) authorize the City Manager to execute the necessary documents on behalf of the City.
12. New Commune DTLA LLC v. City of Redondo Beach Appeal. Authorization to Participate as Amicus Curiae in the New Commune DTLA v. City of Redondo Beach, California Supreme Court Appeal.
Staff Report By: Fred Galante, City Attorney
RECOMMENDATION: That the City Council authorize participation in the appeal of the Court of Appeal’s New Commune DTLA LLC v. City of Redondo Beach decision to the Supreme Court as amicus curiae (often referred to as a “friend of the court” brief supporting the position of one of the parties) to advocate for clarity and flexibility in the application of Government Code § 65583.2 to overlay zoning strategies.
MAYOR AND COUNCIL REPORTS
This is the time and place for the Mayor and Council Members to report on prescheduled Council Committee Assignment Meetings that were held since the last Regular Council Meeting, and any other items of interest. Upon request by an individual Council Member, the City Council may choose to take action on any of the subject matters listed below.
Mayor Ulloa
Mayor Pro Tem Burton
Council Member Comstock
Council Member Flores
13. Community Support Fund - Council Member Flores. Approve community support fund contributions to Chino Police Officers' Foundation, Chino Valley Fire Foundation, and Soroptimist International of the Chino Valley.
Staff Report By: Council Member Flores
RECOMMENDATION: Approve a community support fund contribution of $500 Chino Police Officers Foundation, $500 to Chino Valley Fire Foundation, and $500 to Soroptimist International of the Chino Valley.
Council Member Lucio
City Manager's Report
City Attorney's Report
Police Chief's Report
Director's Report
Fire Chief's Report
5 CHINO CITY COUNCIL
DECEMBER 2, 2025 6
ADJOURN
The next Regular Meeting of the City Council will be held on Tuesday, December 16, 2025 at 6:00 p.m. (Closed Session no earlier than 4:00 p.m. if necessary) in these Council Chambers.
I, Natalie Gonzaga, City Clerk of the City of Chino, hereby declare that on Wednesday, November 26, 2025 this agenda was posted on the south window of Chino City Hall and this agenda together with all of the agenda reports and related documents were posted on the City’s website at www.cityofchino.org by myself or under my direction.
_______________________________________
Natalie Gonzaga, City Clerk.
6 MEMORANDUM
CITY OF CHINO
ADMINISTRATION DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: MAYOR AND CITY COUNCIL MEMBERS, CITY OF CHINO
FROM: LINDA REICH, CITY MANAGER
SUBJECT
..titl e
Boy’s Republic
..end
..body
7 MEMORANDUM
CITY OF CHINO
COMMUNITY SERVICES, PARKS & RECREATION DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: LINDA REICH, CITY MANAGER
FROM: SILVIA AVALOS, DIRECTOR OF COMMUNITY SERVICES, PARKS &
RECREATION
SUBJECT
..titl e
Recognition of the 2025 Sports Legends Youth Volunteer Award Winner, Courtney Garcia, Chino American Little League, for service to youth sports in the Chino community. ..end
..body
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
Commitment to Our Community
Public Service Excellence through Internal and External Partnerships 8 MEMORANDUM
CITY OF CHINO
ADMINISTRATION DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: MAYOR AND CITY COUNCIL MEMBERS, CITY OF CHINO
FROM: LINDA REICH, CITY MANAGER
SUBJECT
..titl e
Business of the Month.
..end
..body
9 MEMORANDUM
CITY OF CHINO
ADMINISTRATION DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: MAYOR AND CITY COUNCIL MEMBERS, CITY OF CHINO
FROM: EUNICE M. ULLOA, MAYOR
SUBJECT
..titl e
Award of Mayor’s Home Beautification Award.
..end
..body
10 MEMORANDUM
CITY OF CHINO
FINANCE DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: LINDA REICH, CITY MANAGER
FROM: KIM SAO, DIRECTOR OF FINANCE
SUBJECT
..titl e
Warrants.
..end
RECOMMENDATION
Approve expenses as audited and within budget for warrants 7773100 to 7773337, and Electronic Fund Transfers 525349E to 525456E, totaling $7,934,495.06. ..body
FISCAL IMPACT
Sufficient funds have been included in the Fiscal Year 25-26 Adopted Budgets.
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
Financial Stability
Revenue: Expenditure:
11 CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: WARRANTS.
PAGE: 2
BACKGROUND
As prescribed by Government Code Sections 37202 and 37208, the following demand registers are herewith submitted for Council ratification:
NO. WARRANTS CHECK DATE FY AMOUNT
1. 7773100 – 7773192 10/30/25 25-26 $1,088,949.88
2. 7773193 – 7773246 11/06/25 25-26 $587,178.40
3. 7773247 – 7773337 11/13/25 25-26 $1,241,672.41
4. 525349E – 525385E 10/31/25 25-26 $1,400,444.00
5. 525386E – 525414E 11/07/25 25-26 $1,389,093.97
6. 525415E – 525456E 11/14/25 25-26 $2,227,156.40
TOTAL $7,934,495.06
ISSUES/ANALYSIS
See attached exhibit for detailed information on warrants exceeding $50,000.
Attachment
12 Council Meeting 12/02/25
CITY OF CHINO
A/P Warrant Register Over $50,000
Check Date
Check
Number Vendor Name Description Amount
10/30/2025 7773124 ELECTRA-MEDIA, INC ECONOMIC DEV-CHINO FORD $144,096.00 7773188 WASTE MANAGEMENT COLLECTION SERVICES $591,992.81 10/31/2025 525355
CHINO VALLEY INDEPENDENT FIRE
DISTRICT FIRE PROTECTION SERVICES $1,310,147.00
11/06/2025 7773220 M K SMITH CHEVROLET NEW UNIT 835 - 1500 CHEVROLET $79,012.32 7773240 SO CAL EDISON CO SERVICE PERIOD: 09/30-10/28 $304,570.14 7773243 TRANSWEST TRUCK CENTER LLC UNIT 547 - 2025 FORD F150 POLICE DEPT $59,972.31 11/07/2025 525402 HARDY & HARPER INC AS NEEDED PAVEMENT SERVICES $206,684.00 525403 INLAND EMPIRE UTILITIES AGENCY SEWAGE TREATMENT SERVICES $1,039,829.03 11/13/2025 7773272
DYETT & BHATIA, URBAN & REGIONAL
PLANNERS GENERAL PLAN SERVICES $84,774.61
7773293 KB HOMES DIF REFUND-FALLONCREST $915,327.48
11/14/2025 525422
CHINO VALLEY INDEPENDENT FIRE
DISTRICT FIRE PROTECTION SERVICES $1,310,147.00
525433 FISHER SCIENTIFIC CO LLC CITY CONSIDERATION 7/1/25-9/30 $589,048.20 525445 MODEL 1 COMMERCIAL VEHICLES, INC. CITY CONSIDERATION 07/01/25-09 $148,480.22 TOTAL $6,784,081.12
13 MEMORANDUM
CITY OF CHINO
ADMINISTRATION DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: LINDA REICH, CITY MANAGER
FROM: NATALIE GONZAGA, CITY CLERK
SUBJECT
..titl e
Minutes.
..end
..body
14 CHINO CITY COUNCIL
SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY
REGULAR MEETING - CITY HALL COUNCIL CHAMBERS
13220 CENTRAL AVENUE
CHINO, CA 91710
TUESDAY, NOVEMBER 18, 2025
MINUTES
CLOSED SESSION – 5:00 PM
OPEN SESSION – 6:00 PM
_________________________________________________________________________________
CALL TO ORDER
The November 18, 2025, Regular Meeting of the Chino City Council / Successor Agency to the Redevelopment Agency was called to order at 5:12 pm by Mayor Eunice M. Ulloa in the Council Chambers.
ROLL CALL
PRESENT: Mayor Eunice M. Ulloa, Mayor Pro Tem Curtis Burton, Council Member Karen C.
Comstock, Council Member Christopher Flores, and Council Member Marc Lucio ABSENT: NONE.
CLOSED SESSION PUBLIC COMMENTS
There were no requests to speak.
CLOSED SESSION
City Attorney Fred Galante read into the record the items listed on the Closed Session agenda.
1. CONFERENCE WITH REAL PROPERTY NEGOTIATOR Pursuant to Government Code 54956.8 Property: APN: 1020-282-12; NWC of Chino Ave. & 6th St. 13272 6th Street, Chino; Agency Negotiator: Linda Reich, City Manager or her designee; Negotiating Parties: Tannehill Langdon TR; Under Negotiation: Price and Terms of Potential Acquisition
2. CONFERENCE WITH LABOR NEGOTIATOR Pursuant to Government Code Section 54957.6: Agency Negotiator: Terry Doyle, Director of Human Resources/Risk Management Employee or her designee Organizations: Chino City Hall Confidential Employee Association; Chino Police Management Association (CPMA); Chino Police Officers Association (CPOA); Chino Police Professional Employees Association (CPPEA); Teamsters Local1932 Professional, Technical and Clerical Unit; American Federation of State, County, and Municipal Employees (AFSCME District Council 36 - Local 3183); Unrepresented Management Sworn and Professional; Executive Management and Deputy Directors; and Part-time Employees The City Council recessed to Closed Session at 5:14 p.m. and concluded at 5:59 p.m. The City Council reconvened the meeting at 6:08 p.m.
15 CHINO CITY COUNCIL
NOVEMBER 18, 2025 2
FLAG SALUTE
Chino Rotary Club Troop 201 led the Pledge of Allegiance.
CEREMONIALS
Proclamations
American Cancer Society’s Great American Smokeout Day - Proclaim November 20, 2025 as American Cancer Society's Great American Smokeout Day in the City of Chino.
Mayor Ulloa read into the record the Proclamation designating November 20, 2025, as American Cancer Society's Great American Smokeout Day in Chino. Michael Adams, CSPR Supervisor, and Kaylee Henriquez, Chino Police Department D.A.R.E. Officer, accepted the Proclamation.
REPORT OUT OF CLOSED SESSION
City Attorney Fred Galante reported out of closed session as follows:
1. CONFERENCE WITH REAL PROPERTY NEGOTIATOR Pursuant to Government Code 54956.8 Property: APN: 1020-282-12; NWC of Chino Ave. & 6th St. 13272 6th Street, Chino; Agency Negotiator: Linda Reich, City Manager or her designee; Negotiating Parties: Tannehill Langdon TR; Under Negotiation: Price and Terms of Potential Acquisition The City Council received a briefing, provided direction, and no further reportable action was taken.
2. CONFERENCE WITH LABOR NEGOTIATOR Pursuant to Government Code Section 54957.6: Agency Negotiator: Terry Doyle, Director of Human Resources/Risk Management Employee or her designee Organizations: Chino City Hall Confidential Employee Association; Chino Police Management Association (CPMA); Chino Police Officers Association (CPOA); Chino Police Professional Employees Association (CPPEA); Teamsters Local1932 Professional, Technical and Clerical Unit; American Federation of State, County, and Municipal Employees (AFSCME District Council 36 - Local 3183); Unrepresented Management Sworn and Professional; Executive Management and Deputy Directors; and Part-time Employees The City Council received an update, provided direction, and no further reportable action was taken.
AGENDA ADDITIONS/REVISIONS
City Manager Linda Reich reported there were no additions or revisions to the agenda.
INFORMATION
External Agency Report for November 18, 2025. Receive and file the External Agency Report for November 18, 2025 (Covering Meetings from September 1 - September 30, 2025).
Mayor Ulloa announced the External Agency Report was included in the agenda packet.
San Antonio Regional Hospital Presentation. Update Presentation from San Antonio Regional Hospital.
Brenda Nuno Gutierrez, Government Affairs Coordinator, San Antonio Regional Hospital, provided an update regarding their services and the state of healthcare in the region. 16 CHINO CITY COUNCIL
NOVEMBER 18, 2025 3
PUBLIC ANNOUNCEMENTS
Mayor Ulloa provided the following event reminders and announcements:
- Gobbler Gloves Boxing Showcase is Sunday, November 23, 2025, at the Neighborhood Activity Center, 5201 D Street. For information, visit cityofchino.org/cspr or call 909-334-3260. - Chino Cares Challenge is open community-wide by collecting food, grocery and fast food gift cards, to help Chino families in need. For donation drop-off information, visit cityofchino.org/ccc.
- City Hall and most city facilities will be closed on Thanksgiving Day, November 27, and the day after Thanksgiving, November 28, 2025. City Hall will resume normal operating hours on Monday, December 1, 2025.
- Santa's Workshop and Tree Lighting Ceremony is Saturday, December 6, 2025, starting at 4:00 p.m., Chino City Hall Lawn. For information, visit cityofchino.org/events. - Chino Youth Christmas Parade & Fair is Saturday, December 13, 2025. For information, visit cityofchino.org/events.
PUBLIC COMMENTS
Pastor Kaylyn Unterkofler, Crosspoint Church, provided the invocation.
Bella Barajas, Allegiance STEAM Academy student, provided an introduction.
Imam Salomon, Ahmadiyya Muslim community, provided an introduction and invitation to their 28th West Coast Jalsa event on December 27, 2025.
Ray Morales, Chino Boxing Foundation, provided an invitation to the Gobbler Gloves Boxing Showcase and thanked the Council Members, Chief of Police, Fire Chief, and City Staff for the outstanding job on the Saturdays Night Fights event.
Bob Nigg, spoke regarding the City of Chino Housing Element in relation to the City of Redondo Beach case, regarding the Regional Housing Needs Allocation (RHNA) overlays.
City Attorney Galante addressed the City of Redondo Beach case.
Mike Gutierrez, inquired about a new city hall plan. Mayor Ulloa stated there is a Civic Center Master Plan that we hope to someday implement, however, there is no current plan to move forward.
Scouts from Troop 201 and Troop 2012 provided an introduction.
CONSENT CALENDAR
1. Warrants. Approve expenses as audited and within budget for warrants 7772823 to 7773099, and Electronic Fund Transfers 525251E to 525348E, totaling $4,774,463.99.
Item No. 2 was pulled from the Consent Calendar for a separate action. 17 CHINO CITY COUNCIL
NOVEMBER 18, 2025 4
3. Elected City Officials’ Report Regarding Travel, Training, and Meetings. Receive and file the Elected City Officials’ Report reflecting City Council business related expenses incurred by the City.
4. Government Relations Update for November 18, 2025. Receive and file the November 18, 2025, Government Relations Update.
5. Adjustments in Compensation for Affected Members of the City of Chino. Approve 1) Resolutions for MOU Amendments and Compensation and Benefit Plans; 2) Resolution No. 2025-079 to amend the City's Classification Plans and Salary Schedules; and 3) Appropriations in the amount of $328,928 to various funds for FY 2025-26.
6. Live Entertainment Permit - Kenwood’s Kitchen and Tap. Approval of a Live Entertainment Permit for Kenwood's Kitchen and Tap, 16287 Main St., Ste 110 Chino, CA, for a period of 12 months, subject to quarterly review of satisfactory compliance with terms, conditions, and restrictions of permit.
7. 2025 Citizens’ Option for Public Safety (COPS) Grant Funds Additional Appropriation. Accept additional funds of $145,294.48 received for the identified expenditure areas of the FY 2024-25 COPS Program Grant G4256 and appropriate an additional expenditure and revenue in the amount of $145,294.48 in the State COPS Fund 130.
8. 2026 Citizens’ Option for Public Safety (COPS) Grant. Accept and approve the use of grant funds for the identified expenditure areas of the 2025-26 COPS Program Grant G4265; appropriate $145,497 to the AB3229-State COPS Grant Fund 130, with a corresponding increase to revenues in the same fund.
9. Notice of Completion for the FY24-25 Traffic Signal Interconnect Project (TR251) with Branson Industries, LLC. Accept Project TR251, Contract No. 2025-251, as complete; authorize the Director of Public Works to file the Notice of Completion; and authorize the release of retention funds following the 35-day lien period absent any claims.
10. Landscape Maintenance Agreement between the City of Chino and Caltrans for the new median on SR-83/Euclid Avenue (Merrill Avenue north to Eucalyptus Avenue). Approve an Agreement between the City of Chino and the State of California, Department of Transportation (Caltrans), for the ongoing maintenance of new median landscaping improvements within the State Highway right-of-way along State Route 83/Euclid Ave.
11. Award a Professional Services Agreement to Proactive Engineering Consultants, Inc. for the Monte Vista Park Expansion Project (PK255). Award a professional services agreement to Proactive Engineering Consultants, Inc. for $163,243.00 to provide engineering design services for the Monte Vista Park Expansion Project (PK255).
12. Adopt Resolution No. 2025-080 to enter into a Funding Agreement D2502006 with the State Water Resources Control Board for the Drinking Water State Revolving Fund program to fund the State Street Water Treatment Plant Project (WA212). Authorize the City to enter into an Agreement with the State Water Resources Control Board through the Drinking Water State Revolving Fund Program to fund WA212; accept the Emerging Contaminates Grant included in the Agreement in the amount of $25,000,000
Motion by Mayor Pro Tem Burton, seconded by Council Member Comstock, to approve the Consent Calendar Items 1 and 3-12 as presented; with item 2 pulled for separate action. The motion carried by the following vote:
AYES: ULLOA, BURTON, COMSTOCK, FLORES, AND LUCIO
NOES: NONE.
18 CHINO CITY COUNCIL
NOVEMBER 18, 2025 5
ABSENT: NONE.
ITEMS PULLED FROM CONSENT
2. Minutes. Regular Meeting Minutes for November 4, 2025 (Mayor Ulloa Absent-Excused).
Motion by Mayor Pro Tem Burton, seconded by Council Member Flores, to approve Consent Calendar Item 2 as presented. The motion carried by the following vote:
AYES: BURTON, COMSTOCK, FLORES, AND LUCIO
NOES: NONE.
ABSENT: NONE.
ABSTAIN: ULLOA
NEW BUSINESS
13. Approve a Memorandum of Understanding (MOU) with the County of San Bernardino for the Operation of the West End Navigation Center. Approve a Memorandum of Understanding (MOU) with the County of San Bernardino for the operation of the West End Navigation Center.
Staff Report By: Silvia Avalos, Director of Community Services, Parks & Recreation.
RECOMMENDATION: 1) Approve a Memorandum of Understanding (MOU) between the City of Chino, County of San Bernardino, and cities of Chino Hills, Fontana, Montclair, Ontario, Rancho Cucamonga, Rialto, and Upland; 2) approve the City of Chino’s share of $200,000 for each of the first two years for the joint operation of the West End Navigation Center located at 11109 Jasmine Street, Fontana, CA; and 3) authorize the City Manager to execute all necessary documents on behalf of the City.
Silvia Avalos, Director of Community Services, Parks and Recreation, and Police Captain Ryan Croley, provided a report on the item.
Mayor Pro Tem Burton inquired about the process, medical staff, and operational hours. Police Captain Croley explained once contact is made and a need is identified, the center will provide wrap around services. He noted the City will provide transportation to the center and assist with the intake process, confirmed there is medical staff and the center will be available 24 hours a day, seven days a week.
Council Member Comstock commented this is resource has been missing in San Bernardino County for some time and is long overdue for the community. She thanked staff and the Mayor for working on it and the County for taking the lead.
Mayor Ulloa discussed the West End Mayor's Roundtable group's years of planning and efforts. She thanked the City of Fontana for moving forward to build the center.
Motion by Mayor Pro Tem Burton, seconded by Council Member Flores, to 1) Approve a Memorandum of Understanding (MOU) between the City of Chino, County of San Bernardino, and cities of Chino Hills, Fontana, Montclair, Ontario, Rancho Cucamonga, Rialto, and Upland; 2) approve the City of Chino's share of $200,000 for each of the first two years for the joint operation of the West End Navigation Center located at 11109 Jasmine Street, Fontana, CA; and 3) authorize the City Manager to execute all necessary documents on behalf of the City. The motion carried by the following vote:
19 CHINO CITY COUNCIL
NOVEMBER 18, 2025 6
AYES: ULLOA, BURTON, COMSTOCK, FLORES, AND LUCIO
NOES: NONE.
ABSENT: NONE.
14. Issuance of Bonds for Community Facilities District 2003-3 Improvement Area 11. Adopt Resolution 2025-081 and Authorize the Issuance of Bonds for Community Facilities District 2003-3 IA 11.
Staff Report By: Kim Sao, Director of Finance and Jon White, Director, Urban Futures, Inc.
RECOMMENDATION: Adopt Resolution No. 2025-081 of the City Council of the City of Chino, acting as the legislative body for Community Facilities District No. 2003-3 of the City of Chino (the “District”), on behalf of Improvement Area No. 11 therein (“Improvement area No. 11”), approving the issuance of the bonds and the substantially final forms of the Preliminary Official Statement, Fiscal Agent Agreement, Bond Purchase Agreement, Continuing Disclosure Agreement, and Appraisal Report (collectively, the “Bond Documents”).
Kim Sao, Director of Finance, and Jon White, Director, Urban Futures, Inc. provided a presentation on the item.
Mr. White noted a minor revision to the Preliminary Official Statement (POS) attachment to incorporate the ownership to include 15 lots owned by Century to read "Century Landbank", which has been submitted to the City Council and saved to the meeting record.
Council Member Lucio inquired about some neighboring cities who issue bonds for 99 years and if this results in a lower payment for the homeowner. Mr. White explained he is not aware, but believes that beyond the life of the bond, the extra funds are used for local improvements.
Motion by Council Member Lucio, seconded by Mayor Pro Tem Burton, to Adopt Resolution No. 2025-081 of the City Council of the City of Chino, acting as the legislative body for Community Facilities District No. 2003-3 of the City of Chino (the "District"), on behalf of Improvement Area No. 11 therein ("Improvement area No. 11"), approving the issuance of the bonds and the substantially final forms of the Preliminary Official Statement, Fiscal Agent Agreement, Bond Purchase Agreement, Continuing Disclosure Agreement, and Appraisal Report (collectively, the "Bond Documents"). The motion carried by the following vote:
AYES: ULLOA, BURTON, COMSTOCK, FLORES, AND LUCIO
NOES: NONE.
ABSENT: NONE.
15. Adjustments in Compensation for Affected Members of the City of Chino. Approve 1) Resolutions for Compensation and Benefit Plans; 2) Resolution No. 2025-078 to amend the City's Classification Plans and Salary Schedules; and 3) Appropriations in the amount of $27,534 to various funds for FY 2025-26.
Staff Report By: Fred Galante, City Attorney
RECOMMENDATION: 1) Adopt Resolution Nos. 2025-088 and 2025-089 approving the Compensation and Benefit Plans for Executive Management and Unrepresented Sworn Management; 2) Adopt Resolution No. 2025-078 to amend the Classification Plan and Compensation Schedule for Executive Management; and 3) Approve appropriation in the amount of $27,534 to the various funds detailed in the fiscal impact section of the staff report. 20 CHINO CITY COUNCIL
NOVEMBER 18, 2025 7
Fred Galante, City Attorney, provided a report on the item. Pursuant to Government Code Sections 53262, 54953(c)(3), and 54956(b), City Attorney Galante reported updates to compensation outlined in the resolutions and exhibits being presented for approval. The updates for Executive Management include a one-time, non-pensionable Retention Pay, a 3% COLA effective the beginning of the pay period after City Council approval, which is November 24, 2025; and a 3% COLA effective the beginning of the pay period that includes July 1, 2026.
Motion by Mayor Pro Tem Burton, seconded by Council Member Comstock, to 1) Adopt Resolution Nos. 2025-088 and 2025-089 approving the Compensation and Benefit Plans for Executive Management and Unrepresented Sworn Management; 2) Adopt Resolution No. 2025-078 to amend the Classification Plan and Compensation Schedule for Executive Management; and 3) Approve appropriation in the amount of $27,534 to the various funds detailed in the fiscal impact section of the staff report. The motion carried by the following vote:
AYES: ULLOA, BURTON, COMSTOCK, FLORES, AND LUCIO
NOES: NONE.
ABSENT: NONE.
16. Ad Hoc Committees. Request to Establish Temporary City Council Ad Hoc Committees.
Staff Report By: Linda Reich, City Manager
RECOMMENDATION: Establish and assign City Council Members to temporary Ad Hoc Committees for 1) Downtown Chino and 2) Information Technology and Training.
City Manager Reich provide a report on the item.
Mayor Ulloa inquired about how often the Ad Hoc Committees will meet. City Manager Reich stated they will meet as needed.
Mayor Ulloa asked that two City Council Members volunteer to serve on the Downtown Chino Ad Hoc Committee. Council Member Flores and Mayor Pro Tem Burton volunteered to serve on the Committee.
Motion by Council Member Comstock, seconded by Council Member Lucio, to establish and assign Council Member Flores and Mayor Pro Tem Burton to the temporary Ad Hoc Committee for Downtown Chino. The motion carried by the following vote:
AYES: ULLOA, BURTON, COMSTOCK, FLORES, AND LUCIO
NOES: NONE.
ABSENT: NONE.
Mayor Ulloa asked that two City Council Members volunteer and serve on the Information Technology and Training Ad Hoc Committee. Council Member Comstock and Council Member Lucio volunteered to serve on the Committee.
Motion by Council Member Flores, seconded by Mayor Pro Tem Burton, to establish and assign Council Member Comstock and Council Member Lucio to the temporary Ad Hoc 21 CHINO CITY COUNCIL
NOVEMBER 18, 2025 8
Committee for Information Technology and Training. The motion carried by the following vote:
AYES: ULLOA, BURTON, COMSTOCK, FLORES, AND LUCIO
NOES: NONE.
ABSENT: NONE.
MAYOR AND COUNCIL REPORTS
Mayor Ulloa
Mayor Ulloa reported on the following meetings and events including the Omnitrans Board of Director's meeting; San Bernardino County Transportation Authority Board of Directors meeting; River Street Market Ecology Center San Juan Capistrano tour; Senior Birthdays; Bark Around Ayala Park; Veterans Day ceremony; Omnitrans Administration and Finance Committee meeting; SBCTA Transit Metro Valley Committee meeting; and City Manager meeting.
Mayor Pro Tem Burton
17. Community Support Fund - Mayor Pro Tem Burton. Approve community support fund contribution to Chino Kiwanis Club (Golf Tournament).
Staff Report By: Mayor Pro Tem Burton
RECOMMENDATION: Approve community support fund contribution of $300 to Chino Kiwanis Club (Golf Tournament).
Motion by Council Member Flores, seconded by Council Member Comstock, to Approve community support fund contribution of $300 to Chino Kiwanis Club (Golf Tournament).
The motion carried by the following vote:
AYES: ULLOA, BURTON, COMSTOCK, FLORES, AND LUCIO
NOES: NONE.
ABSENT: NONE.
Mayor Pro Tem Burton reported on the following meetings and events including a meeting to discuss noise issues from the Ontario International Airport; Chino Valley Historical Society meeting; Bark Around Ayala Park; City Manager meeting; Mayor's Prayer Breakfast; Howard Cattle Elementary Veterans Day event; Youth Sports President's dinner; Chino Basin Watermaster Appropriative Pool Committee meeting; Animal Resource Center Design meeting; Closed Session; thanked Bella Barajas and Bob Nigg, who provided a public comment; and reminded everyone about the Gobbler Gloves boxing event.
Council Member Comstock
Council Member Comstock complimented the City Veterans Day event; complimented the efforts of the Chino Police Department as they provided service to Deputy Nunez's funeral and their work on the retail theft operations; spoke regarding the current rain conditions and the past challenges; and expressed her sympathy to Mayor Pro Tem Burton for the loss of his Mother in Law.
22 CHINO CITY COUNCIL
NOVEMBER 18, 2025 9
Council Member Lucio
Council Member Lucio expressed his condolences to Mayor Pro Tem Burton and his wife Bertie; provided a suicide prevention reminder; wished everyone a Happy Thanksgiving and encouraged everyone to volunteer in a food give away program and help others in need.
Council Member Flores
Council Member Flores reported he participated in the Learning Experience community helpers lesson; wished everyone a Happy Thanksgiving; announced upcoming Thanksgiving food giveaways; and expressed his condolences to the Burton family.
City Manager's Report
City Manager Reich had no report.
City Attorney's Report
City Attorney Galante had no report.
Police Chief's Report
Police Chief Mensen reported that over $7,500 raised from the pink patch fundraiser will be donated to the Loma Linda Cancer Care Center; the first Stuff the Sleigh event will be at Painted Dough on Saturday, November 22 from 1:00-3:00 p.m.; and announced the retail theft operation is in effect, with Proposition 36 violators subject to felony bookings.
Director's Report
Hye Jin Lee, Director of Public Works, provided a report on the current weather condition and confirmed there are no significant incidents; announced fire stations are restocked with sand and sandbags; and provided a highlight regarding Consent Calendar Item 12, where staff secured an additional $15 million grant for the State Street water project.
Fire Chief's Report
Fire Chief Dave Williams had no report.
ADJOURN
The meeting adjourned at 7:57 p.m. The next Regular Meeting of the City Council will be held on Tuesday, December 2, 2025 at 6:00 p.m. (Closed Session no earlier than 4:00 p.m. if necessary) in these Council Chambers.
APPROVED AND ADOPTED THIS 2ND DAY OF DECEMBER 2025.
________________________________
EUNICE M. ULLOA, MAYOR
ATTEST:
________________________________
NATALIE GONZAGA, CITY CLERK
**************************************************
(These minutes are not official until signed.)
23 MEMORANDUM
CITY OF CHINO
ADMINISTRATION DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: LINDA REICH, CITY MANAGER
FROM: NATALIE GONZAGA, CITY CLERK
SUBJECT
..titl e
Elected City Officials’ Report Regarding Travel, Training, and Meetings. ..end
RECOMMENDATION
Receive and file the Elected City Officials’ Report reflecting City Council business related expenses incurred by the City.
..body
FISCAL IMPACT
Sufficient funding is available in the adopted Fiscal Year 2025-26 Operating Budget.
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above furthers the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
Superior Customer Service
Responsible Long-Range Planning
Exemplary Leadership
Public Service Excellence through Internal and External Partnerships Revenue: Expenditure: 1002000-43320
Transfer In: Transfer Out:
24 CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: ELECTED CITY OFFICIALS’ REPORT REGARDING TRAVEL, TRAINING, AND MEETINGS.
PAGE: 2
BACKGROUND
In accordance with Government Code Sections 53232.2 and 53232.3, implementing Assembly Bill (AB) 1234 on January 1, 2006, the City adopted Resolution No. 2005-093 establishing a Business-Related Expense Policy. On December 6, 2016, the City approved Resolution No. 2016-075 adopting the latest revisions to this policy. In addition to requiring local agencies to adopt a business-related expense policy, AB 1234 requires that Elected Officials provide a brief report on meetings attended at the expense of the local agency at the next regular meeting of the legislative body.
ISSUES/ANALYSIS
In response to AB 1234, a report regarding Elected City Officials’ Travel, Training, and Meetings (Exhibit A) was created and is placed on the City Council Agenda Consent Calendar, as needed. The documents that pertain to the items listed on Exhibit A are available for public inspection at the City Clerk’s office located in City Hall at 13220 Central Avenue, Chino, CA.
Attachment – Exhibit A
25 12/2/2025 City Council Meeting
Event Date Meeting Purpose
and Subject
Matter
Location City Official
Attendees
November 21, 2025 League of California
Cities Division
Meeting
Ontario, CA Mayor Pro Tem
Burton
26 MEMORANDUM
CITY OF CHINO
ADMINISTRATION DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: MAYOR AND CITY COUNCIL MEMBERS, CITY OF CHINO
FROM: LINDA REICH, CITY MANAGER
SUBJECT
..titl e
City Council Regular Meeting Cancellation.
..end
RECOMMENDATION
Authorize staff to cancel the January 6, 2026 City Council Regular Meeting. ..body
FISCAL IMPACT
No Fiscal Impact.
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
Responsible Long-Range Planning
Revenue: Click or tap here to enter text. Expenditure:
Transfer In: Click or tap here to enter text. Transfer Out: Click or tap here to enter text. 27 CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: CITY COUNCIL REGULAR MEETING CANCELLATION.
PAGE: 2
BACKGROUND
From time to time, the City Council has voted to cancel regularly scheduled meetings due to conflicts with events or holidays. The Tuesday, January 6, 2026 regular City Council meeting falls near the 2025 City holiday closure.
ISSUES/ANALYSIS
City staff is recommending cancellation of this meeting due to the proximity of the agenda posting deadline and the meeting date to the City holiday closure. With the December 16, 2025 and January 20, 2026 regular meetings scheduled, there is no significant gap in meetings, allowing for the continuation of City business.
Should the City Council approve the cancellation of the Tuesday, January 6, 2026 meeting, the next regular meeting of the City Council would be held on January 20, 2026. 28 MEMORANDUM
CITY OF CHINO
PUBLIC WORKS DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: LINDA REICH, CITY MANAGER
FROM: HYE JIN LEE, PUBLIC WORKS DIRECTOR
SUBJECT
..titl e
Replacement Subdivision Improvement Agreement for Tract Map No. 16420-6 (Block 11 - Lots 2 & 3) – Lennar Homes of California, LLC.
..end
RECOMMENDATION
Approve replacement Subdivision Improvement Agreement and securities with Lennar Homes of California, LLC for Tract Map No. 16420-6 (Block 11 - Lots 2 & 3); and authorize the City Manager to execute any necessary documents on behalf of the City. ..body
FISCAL IMPACT
There is no direct fiscal impact to the City.
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above will further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
Responsible Long-Range Planning
Public Service Excellence Through Internal & External Partnerships 29 CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: REPLACEMENT SUBDIVISION IMPROVEMENT AGREEMENT FOR TRACT MAP NO. 16420-6 (BLOCK 11 - LOTS 2 & 3) - LENNAR HOMES OF CALIFORNIA, LLC.
PAGE: 2
BACKGROUND
In 2008, the City’s Planning Commission approved an “A” level Master Site Approval and Tentative Tract Map No. 16420 to subdivide 522 acres of land generally located south of Pine Avenue, west of Hellman Avenue, and north and east of Chino Corona Road for what is known as the South of Pine area in The Preserve. An "A" level master site development plan is a preliminary, conceptual plan for a large-scale land development project. The purpose of the original Master Site Approval was to establish large parcels, and phase major backbone street systems for both future residential and non-residential development within the master plan area.
On February 23, 2022, the City’s Planning Commission conditionally approved a Development Modification to the Master Site Approval and Tentative Tract Map No. 16420. The modification removed the phased development concept originally approved, divided the larger land area into smaller lots to be reconveyed for development, and established improvement areas for future development. It is important to note that the Developer modification also incorporated conditions of approval for improvements along Pine Avenue for associated developments within the larger project area to help facilitate needed improvements to the area.
Subsequently, on September 19, 2022, the City’s Planning Commission approved a 32.63-acre Master Site Approval PL21-0056 and Tentative Tract Map No. 20445 for the future development of 305 single-family homes within four neighborhoods, a pocket park, and private recreation center located in the MDR (Medium Density Residential) and CC16 (Community Core 16) land use designations known as “Block 11.” This project is generally located south of Legacy Park Street, east of Main Street, and north of East Preserve Loop.
The developer, Chino Preserve Development Corporation, a Lewis Management Corporation company (“Lewis”), received City Council approval of Final Map No. 16420-6 on April 1, 2025, to subdivide the previously approved Tentative Tract Map No. 16420, as shown in Exhibit A. Lewis is actively developing the site and has entered into purchase agreements with four guest builders.
The Engineering Conditions of Approval (COA) for Block 11 requires public improvements including, but not limited to curb, gutter, sidewalk, streetlights, asphalt concrete pavement, median/parkway landscape, sewer, water, recycled water and drainage improvements. To guarantee the completion of these public improvements, Lewis entered into a Subdivision Improvement Agreement (SIA) with the City and obtained the necessary securities for the improvements which were approved with the Final Map on April 1, 2025.
ISSUES/ANALYSIS
Now that the final escrows for the guest builders have closed, City staff is coordinating with each builder to execute replacement SIAs to transfer and secure their respective obligations.
Lennar Homes, LLC has acquired Lots 2 and 3, as shown in Exhibit A of the attached replacement SIA. The conditions established at the time of tentative map approval have been met through execution of the replacement agreement for Tract Map No. 16420-6 and the posting of securities guaranteeing construction of the public improvements required for Block
11. The City Attorney has reviewed and approved the replacement SIA and associated securities. Additionally, Lewis has executed a Partial Assignment and Assumption Agreement to the Development Agreement with Lennar Homes of California, LLC.
Attachments:
Exhibit A - Location Map Tract Map No. 16420-6
30 CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: REPLACEMENT SUBDIVISION IMPROVEMENT AGREEMENT FOR TRACT MAP NO. 16420-6 (BLOCK 11 - LOTS 2 & 3) - LENNAR HOMES OF CALIFORNIA, LLC.
PAGE: 3
Exhibit B – Replacement Subdivision Improvement Agreement 31 32
01225.0006/366470.2 Updated 10-2020
SUBDIVISION IMPROVEMENT AGREEMENT
by and between
CITY OF CHINO
and
LENNAR HOMES OF CALIFORNIA, LLC
33 01225.0006/366470.2
SUBDIVISION IMPROVEMENT AGREEMENT BETWEEN
THE CITY OF CHINO
AND
LENNAR HOMES OF CALIFORNIA, LLC
INLAND DIVISION
Agreement Date: December 2, 2025
Subdivider Name: Lennar Homes of California, LLC
Subdivision Description: A request to construct 84 detached residential condominium dwelling units on 5.7 adjusted gross acres of land at a density of 11.9 dwelling units per acre in the Medium Density Residential (MDR) land use designation and 18.4 dwelling units per acre in the Community Core 16 (CC 16) land use designation of The Preserve Specific Plan located within Tract Map 16420-6, Block 11, Lots 2 & 3.
Location: Generally located south of Legacy Park Street, east of Main Street, and west of East Preserve Loop (APNs: 1057-181-20, and -43)
Tentative Map No.: 16420-6 Lots 2 & 3
Estimated Total Cost of Improvements: $888,855.49
Estimated Total Cost of Monumentation: $0 (based upon the plans, including individual lots, subdivision boundary and public improvements).
Security:
Lots 2 & 3 In-Tract Streets $143,660.21
Lots 2 & 3 In-Tract Wet Utilities $128,865.28
Lots 2 & 3 Public Water in Private Alleys $616,330.00
34 01225.0006/366470.2
Designees for the Service of Written Notice:
CITY: SUBDIVIDER:
Jesus Plasencia
Assistant City Engineer
13220 Central Avenue
Chino, CA 91710
(909) 334-3417
[email protected]
Lennar Homes of California, LLC
c/o Geoffrey Smith
Lennar Homes of California, LLC
4140 Temescal Canyon Rd., Suite 410
Corona, CA 92883
Office: (949) 278-6661
[email protected]
CITY PROJECT INSPECTOR
Isaac Ortega
Permit & Inspection Supervisor
13220 Central Avenue
Chino, CA 91710
(909) 334-3501
[email protected]
35 01225.0006/366470.2
TABLE OF CONTENTS
1. Construction Obligations
1.1 Works of Improvement
1.2 Other Obligations Referenced in Conditions of Tentative Map Approval
1.3 Intent of Plans
1.4 Survey Monuments
1.5 Performance of Work
1.6 Changes in the Work
1.7 Defective Work
1.8 No Warranty by City
1.9 Authority of the City Engineer
1.10 Documents Available at the Site
1.11 Inspection
1.12 Compliance with Law; Applicable Standards for Improvements
1.13 Suspension of Work
1.14 Erosion and Dust Control and Environmental Mitigation
1.15 Final Acceptance of Works of Improvement
1.16 Vesting of Ownership
1.17 Subdivider’s Obligation to Warn Public During Construction
1.18 Injury to Public Improvements, Public Property or Public Utility
2. Time for Performance
2.1 Commencement and Completion Dates
2.2 Phasing Requirements
2.3 Force Majeure
2.4 Continuous Work
2.5 Reversion to Acreage
3. Labor
3.1 Labor Standards
3.2 Nondiscrimination
3.3 Licensed Contractors
3.4 Workers’ Compensation
4. Security
4.1 Required Security
4.2 Form of Security Instruments
4.3 Subdivider’s Liability
4.4 Letters of Credit
4.5 Release of Security Instruments
5. Cost of Construction and Provision of Inspection Service
5.1 Subdivider Responsible for All Related Costs of Construction 36 01225.0006/366470.2
5.2 Payment to City for Cost of Related Inspection and Engineering Services
5.3 Payment of Development Impact Fees
6. Acceptance of Offers of Dedication
7. Warranty of Work
8. Default
8.1 Default by Subdivider
8.2 Remedies
8.3 Remedies Not Exclusive
8.4 Attorney’s Fees and Costs
8.5 Waiver
9. Indemnity/Hold Harmless
10. Subdivider’s Indemnity of Project Approval
11. Insurance Requirements
12. Environmental Warranty
13. General Provisions
13.1 Successors and Assigns
13.2 No Third-Party Beneficiaries
13.3 No Vesting Rights
13.4 Subdivider is Not Agent of City
13.5 Time of the Essence
13.6 Notices
13.7 No Apportionment
13.8 Severability
13.9 Captions
13.10 Incorporation of Recitals
13.11 Interpretation
13.12 Entire Agreement; Waivers and Amendments
13.13 Counterparts
14.Authority
37 01225.0006/366470.2
1 SUBDIVISION IMPROVEMENT AGREEMENT
THIS SUBDIVISION IMPROVEMENT AGREEMENT (this “Agreement”) is entered into this 2nd day of December, 2025, by and between the CITY OF CHINO, a municipal corporation, organized and existing in the County of San Bernardino, under and by virtue of the laws of the State of California, (“CITY”), and Lennar Homes of California LLC, (“SUBVIDER”).
RECITALS
A. Subdivider is the owner of, and has obtained approval of a subdivision map identified as Tentative Tract Map No. 16420-6 (Lots 2 & 3), (the “Map”), located in the City of Chino, County of San Bernardino, State of California (the “Property”), as described on Exhibit “A”. The Map requires Subdivider to comply with certain conditions of approval for the development of the Property (the “Conditions”) as described on Exhibit “B”.
B. Pursuant to the Conditions, Subdivider, by the Map, has offered for dedication to City for public use of the streets and easements shown on the Map. City desires to accept the streets and easements shown on the Map for public use, and certain other improvements described in this Agreement.
C. Subdivider has delivered to City, and City has approved, plans and specifications and related documents for certain “Works of Improvement” (as hereinafter defined) which are required to be constructed and installed in order to accommodate the development of the Property.
D. Subdivider’s agreement to construct and install the Works of Improvement pursuant to this Agreement and its offer of dedication of the streets, easements and other improvements and facilities, as shown on the Map, are a material consideration to City in approving Final Map No. 16420-6 (Lots 2 & 3) for the Property and permitting development of the Property to proceed.
COVENANTS
Based upon the foregoing Recitals which are incorporated herein by reference and in consideration of City’s approving the Map for the Property and permitting development of the Property to proceed, Subdivider agrees to timely perform all of its obligations as set forth herein.
1. Construction Obligations.
1.1. Works of Improvement. Subdivider agrees, at its sole cost and expense, to construct or install, or cause to be constructed or installed the street, drainage, domestic water, sanitary sewer, street lighting, landscaping, utility, and other improvements more fully described in Exhibit “B” attached hereto (the “Works of Improvement”), as the same may be supplemented and revised from time to time as set forth in this Agreement (said plans and 38 01225.0006/366470.2
2 specifications, together with all related documents, the “Plans”). The estimated construction cost for the Works of Improvement is $888,855.49.
1.2. Other Obligations Referenced in Conditions of Tentative Map Approval. In addition to the foregoing, Subdivider shall satisfy all of the Conditions on the Map for the Property. The Conditions associated with the Map are included in Exhibit “B” attached hereto.
1.3. Intent of Plans. The intent of the Plans referenced in Section 1.1 is to prescribe a complete work of improvement which Subdivider shall perform or cause to be performed in a manner acceptable to the City Engineer, (or designee), and in full compliance with all codes and the terms of this Agreement. Subdivider shall complete a functional or operable improvement or facility, even though the Plans may not specifically call out all items of work required for Subdivider’s contractor to complete its tasks, incidental appurtenances, materials, and the like. If any omissions are made or information necessary to carry out the full intent and meaning of the Plans, Subdivider or its contractor shall immediately notify its design engineer who will seek approval of the City Engineer for furnishing of detailed instructions. In the event of any doubt or question arising regarding the true meaning of any of the Plans, reference shall be made to the City Engineer whose decision thereon shall be final.
Subdivider recognizes that the Plans consist of general drawings. All authorized alterations affecting the requirements and information given on the Plans shall be in writing and approved by the City Engineer. The Plans shall be supplemented by such working or shop drawings as are necessary to adequately control the work. Without the City Engineer’s prior written approval, no change shall be made by Subdivider or its contractor to any plan, specification, or working or shop drawing after it has been stamped as approved.
1.4. Survey Monuments. Before final approval of street improvements, Subdivider shall place survey monuments as shown on Final Map No. 16420-6 (Lots 2 &3) in accordance with the provisions of the State Subdivision Map Act and the Subdivision Ordinance of the City of Chino. Subdivider shall provide security for such obligation as provided in Section 4.1(a)(iii) and, after setting the monuments, Subdivider shall furnish the City Engineer written notice of the setting of said monuments and written proof of having paid the engineer or surveyor for the setting of said monuments.
1.5. Performance of Work. Subdivider shall furnish or cause to be furnished all materials, labor, tools, equipment, utilities, transportation, and incidentals required to perform Subdivider’s obligations under this Agreement.
1.6. Changes in the Work. The City Engineer, without invalidating this Agreement and without notification to any of the sureties or financial institutions referenced in Paragraph 4, may order extra work or may make changes by altering or deleting any portion of the Works of Improvement as specified herein or as deemed necessary or desirable by the City Engineer as determined necessary to accomplish the purposes of this Agreement and to protect the public health, safety, or welfare. The City Engineer shall notify Subdivider or its contractor in writing (by Correction Notice) at the time a determination has been made to require changes in the work. No field changes performed or proposed by Subdivider or its contractor shall be binding on City unless approved in writing by the City Engineer. The City and Subdivider may mutually 39 01225.0006/366470.2
3 agree upon changes to the Works of Improvement, subject to the security requirements in Section 4.
1.7. Defective Work. Subdivider shall cause its contractor to repair, reconstruct, replace, or otherwise make acceptable any work found by the City Engineer to be defective.
1.8. No Warranty by City. The Plans for the Works of Improvement have been prepared by or on behalf of Subdivider or its consultants or contractors, and City makes no representation or warranty, express or implied, to Subdivider or to any other person regarding the adequacy of the Plans or related documents.
1.9. Authority of the City Engineer. In addition to the authority granted to the City Engineer elsewhere in this Agreement, the City Engineer shall have the authority to decide all questions which may arise as to the quality and acceptability of materials furnished and work performed, and all questions as to the satisfactory and acceptable fulfillment of the terms of this Agreement by Subdivider and its contractor.
1.10. Documents Available at the Site. Subdivider shall cause its contractor to keep a copy of all approved Plans at the job site and shall give access thereto to the City’s inspectors and engineers at all times.
1.11. Inspection. Subdivider shall have an authorized representative on the job site at all times during which work is being done who has full authority to act for Subdivider, or its design engineer, and Subdivider’s contractor(s) regarding the Works of Improvement.
Subdivider shall cause its contractor to furnish the City with every reasonable facility for ascertaining whether or not the Works of Improvement as performed are in accordance with the requirements and intent of this Agreement, including the Plans. If the City inspector requests it, the Subdivider’s contractor, at any time before acceptance of the Works of Improvement, shall remove or uncover such portions of the finished work as may be directed which have not previously been inspected. After examination, the Subdivider’s contractor shall restore said portions of the work to the standards required hereunder. Inspection or supervision by the City Engineer (or designee) shall not be considered as direct control of the individual workmen on the job site. City’s inspectors shall have the authority to stop any and all work not in accordance with the requirements contained or referenced in this Agreement.
The inspection of the work by City shall not relieve Subdivider or its contractor of any obligations to fulfill this Agreement as herein provided, and unsuitable materials or work may be rejected notwithstanding that such materials or work may have been previously overlooked or accepted.
1.12. Compliance with Law; Applicable Standards for Improvements. In addition to the express provisions of this Agreement and the Plans, Subdivider shall cause construction of the Works of Improvement to be completed in accordance with all other applicable federal, state, and local laws, ordinances, rules and regulations. In addition, without limiting the foregoing, the Subdivider shall, at its expense, obtain and comply with the conditions of all necessary permits and licenses for the construction of the Works of Improvement. The Subdivider shall also give all necessary notices and pay all fees and taxes as required by law. 40 01225.0006/366470.2
4 Subdivider shall construct the improvements in accordance with the City standards in effect at the time of the adoption of the Approved Tentative Map. City reserves the right to protect the public safety or welfare or comply with applicable Federal or State law or City zoning ordinances.
1.13. Suspension of Work. The City Engineer shall have authority to order suspension of the work for failure of the Subdivider’s contractor to comply with law pursuant to Section
1.12. In case of suspension of work for any cause whatsoever, Subdivider and its contractor shall be responsible for all materials and shall store them properly if necessary and shall provide suitable interim drainage and/or dust control measures, and erect temporary structures where necessary.
1.14. Erosion and Dust Control and Environmental Mitigation. All grading, landscaping, and construction activities shall be performed in a manner to control erosion and prevent flooding problems. The City Engineer shall have the authority to require erosion plans to prescribe reasonable controls on the method, manner, and time of grading, landscaping, and construction activities to prevent nuisances to surrounding properties. Plans shall include without limitation temporary drainage and erosion control requirements, dust control procedures, restrictions on truck and other construction traffic routes, noise abatement procedures, storage of materials and equipment, removal of garbage, trash, and refuse, securing the job site to prevent injury, and similar matters.
1.15. Final Acceptance of Works of Improvement. After Subdivider’s contractor has completed all of the Works of Improvement, Subdivider shall then request a final inspection of the work. If items are found by the City’s inspectors to be incomplete or not in compliance with this Agreement or any of the requirements contained or referenced herein, City will inform the Subdivider or its contractor of such items. After the Subdivider’s contractor has completed these items, the procedure shall then be the same as specified above for the Subdivider’s contractor’s initial request for final inspection. If items are found by City’s inspectors to be incomplete or not in compliance after two (2) “final” inspections, the City may require the Subdivider or its contractor, as a condition to performing further field inspections, to submit in writing a detailed statement of the work performed subsequent to the date of the previous inspection which was found to be incomplete or not in compliance at that time. Subdivider shall be responsible for payment to City Engineer of re-inspection fees in the amount necessary to cover the City’s costs for additional final inspections, as determined by the City Engineer.
No inspection or acceptance pertaining to specific parts of the Works of Improvement shall be construed as final acceptance of any part until the overall final acceptance by the City Engineer is made. The City Engineer shall make a certification of completion and acceptance on the Works of Improvement by recordation of a Notice of Acceptance on behalf of the City.
Final acceptance shall not constitute a waiver by the City Engineer of defective work subsequently discovered.
The date on which the Works of Improvement will be considered as complete shall be the date of the Notice of Acceptance.
41 01225.0006/366470.2
5 1.16. Vesting of Ownership. Upon recordation of the Notice of Acceptance, ownership of the Works of Improvement shall vest in the City.
1.17. Subdivider’s Obligation to Warn Public During Construction. Until recordation of the Notice of Acceptance, Subdivider shall give good and adequate warning to the public of any dangerous condition of the Works of Improvements and shall take reasonable actions to protect the public from such dangerous condition. Until recordation of the Notice of Acceptance, Subdivider shall provide forty-eight (48) hours’ advance written notice to all neighboring property owners and tenants affected by Subdivider’s operations or construction of the hours, dates and duration of any planned construction activities.
1.18. Injury to Public Improvements, Public Property or Public Utility. Until recordation of the Notice of Acceptance of the Works of Improvement, Subdivider assumes responsibility for the care and maintenance of, and any damage to, the Works of Improvements. Subdivider shall replace or repair all Works of Improvements, public property, public utility facilities, and surveying or subdivision monuments and benchmarks which are destroyed or damaged for any reason, regardless whether resulting from the acts of the Subdivider, prior to the recordation of the Notice of Acceptance. Subdivider shall bear the entire cost of such replacement or repairs regardless of what entity owns the underlying property. Any repair or replacement shall be to the satisfaction, and subject to the approval, of the City Engineer.
Neither the City, nor any officer or employee thereof, shall be liable or responsible for any accident, loss or damage, regardless of cause, occurring to the work or Works of Improvements prior to recordation of the Notice of Acceptance of the work or improvements.
2. Time for Performance.
2.1. Commencement and Completion Dates. Subject to Sections 2.2 and 2.3 below, Subdivider shall (i) commence with construction and installation of the Works of Improvement thirty (30) days following City’s approval of the Plans (“Commencement Date”); and (ii) complete or cause to be completed all of the Works of Improvement within two (2) years after the Commencement Date. In the event good cause exists as determined by the City Engineer, the time for commencement of construction or completion of the Works of Improvement hereunder may be extended by up to three (3) additional one-year periods. Extensions shall be executed in writing by the City Engineer. The City Engineer in his or her sole discretion determines whether or not the Subdivider has established good cause for an extension. As a condition of such extension, the City Engineer may require Subdivider to furnish new security guaranteeing performance of this Agreement, as extended, in an increased amount to compensate for any increase in construction costs as determined by the City Engineer. If Subdivider requests and is granted an extension of time for completion of the improvements, City may apply the standards in effect at the time of the extension.
2.2. Phasing Requirements. Notwithstanding the provisions of Section 2.1, the City reserves the right to control and regulate the phasing of completion of specific Works of Improvement as required to comply with applicable City ordinances, regulations, and rules relating to the timely provision of public services and facilities. In addition to whatever other remedies the City may have for Subdivider’s failure to satisfy such phasing requirements, as 42 01225.0006/366470.2
6 the same now exist or may be amended from time to time, Subdivider acknowledges City’s right to withhold the issuance of further building permits on the Property until such phasing requirements are satisfied. Prior to issuance of building permits, Subdivider shall provide satisfactory evidence that all applicable requirements that are a condition to issuance of building permits have been satisfied. Such requirements may include the payment of fees, construction of improvements, or both. Final inspections or issuance of Certificates of Occupancy may be withheld from the Subdivider by the City, if, upon a determination by the City Engineer, completion of specific Works of Improvements or other requirements associated with the development of the Property have not been completed to the City Engineer’s satisfaction.
2.3. Force Majeure. Notwithstanding the provisions of Section 2.1, Subdivider’s time for commencement and completion of the Works of Improvement shall be extended for the period of any enforced delay caused due to circumstances beyond the control and without the fault of Subdivider, including to the extent applicable adverse weather conditions, flood, earthquakes, strikes, lockouts, pandemics, acts or failures to act of a public agency (including City), required changes to the scope of work required by City, and similar causes; provided, however, that the period of any enforced delay hereunder shall not include any period longer than five (5) days prior to City’s receipt of a written notice from Subdivider or its contractor detailing the grounds for Subdivider’s claim to a right to extend its time for performance hereunder. The City Engineer shall evaluate all claims to Force Majeure and make a reasonable determination regarding the length of any extension of time for commencement and/or completion of the Works of Improvement and the City Engineer’s decision shall be final.
2.4. Continuous Work. After commencement of construction of the Works of Improvement (or separate portion thereof), Subdivider shall cause such work to be diligently pursued to completion and shall not abandon the work for a consecutive period or more than thirty (30) days, events of Force Majeure excepted.
2.5. Reversion to Acreage. In addition to whatever other rights City may have due to Subdivider’s failure to timely perform its obligations hereunder, Subdivider recognizes that City reserves the right to revert the Property to acreage subject to the limitations and requirements set forth in California Government Code Section 66499.11 through Section 66499.20.1.
3. Labor.
3.1. Labor Standards. This Agreement is subject to, and Subdivider agrees to comply with, all of the applicable provisions of the Labor Code including, but not limited to, the wage and hour, prevailing wage, worker compensation, and various other labor requirements in Division 2, Part 7, Chapter 1, including section 1720 to 1740, 1770 to 1780, 1810 to 1815, 1860 to 1861, which provisions are specifically incorporated herein by reference as set forth herein in their entirety. Subdivider shall expressly require compliance with the provisions of this Section in all agreements with contractors and subcontractors for the performance of the Works of Improvement.
3.2. Nondiscrimination. In accordance with the California Fair Employment and Housing Act (“FEHA”), California Government Code Section 12940 et seq., Subdivider agrees 43 01225.0006/366470.2
7 that Subdivider, its agents, employees, contractors, and subcontractor performing any of the Works of Improvement shall not discriminate, in any way, against any person on the basis of race, ethnicity, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status. Subdivider shall expressly require compliance with the provisions of this Section in all agreements with contractors and subcontractors for the performance of this Agreement.
3.3. Licensed Contractors. Subdivider shall cause all of the Works of Improvement to be constructed by contractors and subcontractors with valid California Contractors’ licenses for the type of work being performed. All of Subdivider’s contractors and subcontractors shall obtain a valid City of Chino business license prior to performing any work pursuant to this Agreement. Subdivider shall provide the City Engineer with a list of all of its contractors and subcontractors prior to initiating any work, and all valid Contractor’s licenses and business licenses issued thereto as a condition of constructing the Works of Improvements.
3.4. Worker’s Compensation. Subdivider shall cause every contractor and subcontractor performing any of the Works of Improvement to carry Workers’ Compensation Insurance as required by the Labor Code of the State of California and shall cause each such contractor and subcontractor to submit to City a Certificate of Insurance verifying such coverage prior to such contractor or subcontractor entering onto the job site.
4. Security.
4.1. Required Security.
(a) At the time Subdivider executes this Agreement, Subdivider shall furnish to City the following bonds, letters of credit, instruments of credit (assignment of deposit account) or other security acceptable to City in its sole and absolute discretion and satisfying the requirements of the applicable provisions of this Section 4 below (hereinafter “Security Instruments”):
(i) A Security Instrument securing Subdivider’s faithful performance of all of the Works of Improvement (“Faithful Performance Security Instrument”), in the amount of $888,855.49 equal to 100% of the estimated construction cost referenced in Section 1.1.
(ii) A Security Instrument guaranteeing the payment to contractors, subcontractors, and other persons furnishing labor, materials, and/or equipment (“Labor and Materials Security Instrument”) with respect to the Works of Improvement in an amount equal to $444,427.75 equal to 50% of the estimated construction cost referenced in Section 1.1.
(iii) A Security Instrument guaranteeing the payment of the cost of setting monuments as required in Section 1.4 in the amount of $0 equal to 100% of the cost thereof.
44 01225.0006/366470.2
8 This Agreement shall not be effective for any purpose until such Security Instruments are supplied to and approved by City in accordance herewith. (b) Required Security Instrument for Maintenance and Warranty. Prior to the City Council’s acceptance of the Works of Improvement and recordation of a Notice of Completion, Subdivider shall deliver a Security Instrument warranting the work accepted for a period of one (1) year following said acceptance (“Maintenance and Warranty Security Instrument”), in the amount of $1,623,613.00 equal to 10% of the estimated construction cost set forth in Section 1.1 or a suitable amount determined by the City Engineer.
4.2. Form of Security Instruments. All Security Instruments shall be in the amounts required under Section 4.1 (a) or 4.1(b), as applicable, shall meet the following minimum requirements and otherwise shall be in a form provided by City or otherwise approved by the City Attorney:
(a) Bonds. For Security Instruments provided in the form of bonds, any such bond must be issued and executed by an insurance company or bank authorized to transact surety business in the State of California. Any insurance company acting as surety shall have a minimum rating of A-IX, as rated by the current edition of Best’s Key Rating Guide published by A.M. Best’s Company, Oldwick, New Jersey, 08858. Any bank acting as surety shall have a minimum rating of AA, as rated by Moody’s or Standard & Poor’s.
(b) Letters of Credit. For Security Instruments which are letters of credit, any letter of credit shall be an original separate unconditional, irrevocable, negotiable and transferable commercial letter of credit issued by a financial institution with offices in the State of California acceptable to City. Any such letter of credit shall specifically permit City to draw on same by unilateral certification of the City Engineer of the City that Subdivider is in default under its payment or performance obligations hereunder or in the event Subdivider fails to deliver a replacement letter of credit not less than thirty (30) days prior to the date of expiration of any such letter of credit and shall further be subject to the provisions of Section 4.4.
(c) Instrument of Credit. For Security Instruments which are Instruments of Credit, any Instrument of Credit shall be an assignment of deposit account assigning as security to City all of Subdivider’s interest in funds on deposit in one or more bank accounts with financial institutions acceptable to City. (d) General Requirements for all Security Instruments.
(i) Payments under any Security Instruments shall be required to be made (and, with respect to bonds, litigation shall be required to be instituted and maintained) in the City of Chino, State of California (and the Security Instrument shall so provide).
45 01225.0006/366470.2
9 (ii) Each Security Instrument shall have a minimum term of one (1) year after the deadline for Subdivider’s completing the Works of Improvement, in accordance with Section 2.1 (other than Instruments of Credit, which shall have no defined term or expiration date).
(iii) Each Security Instrument shall provide that changes may be made in the Works of Improvement pursuant to the terms of this Agreement without notice to any issuer or surety and without affecting the obligations under such Security Instrument. (iv) If the Subdivider seeks to replace any security with another security, the replacement shall: (1) comply with all the requirements for security in this Agreement; (2) be provided by the Subdivider to the City Engineer; and (3) upon its written acceptance by the City Engineer, be deemed a part of this Agreement. Upon the City Engineer’s acceptance of a replacement security, the former security shall be released by the City.
4.3. Subdivider’s Liability. While no action of Subdivider shall be required in order for City to realize on its security under any Security Instrument, Subdivider agrees to cooperate with City to facilitate City’s realization under any Security Instrument, and to take no action to prevent City from such realization of any Security Instrument. Notwithstanding the giving of any Security Instrument or the subsequent expiration of any Security Instrument or any failure by any surety or financial institution to perform its obligations with respect thereto, Subdivider shall be personally liable for performance under this Agreement and for payment of the cost of the labor and materials for the improvements required to be constructed or installed hereby and shall, within ten (10) days after written demand therefor, deliver to City such substitute security as City shall require satisfying the requirements in this Section 4.
4.4. Letters of Credit.
(a) In the event a letter of credit is given pursuant to Section 4.2(b), City shall be entitled to draw on any such letter of credit if a replacement letter of credit (expiring in not less than one (1) year, unless City agrees to a lesser term in City’s sole and absolute discretion) is not delivered not less than thirty (30) days prior to the expiration of the original letter of credit, such substitute letter of credit being in the same amount and having the terms and conditions as the initial letter of credit delivered hereunder, issued by a financial institution acceptable to City as of the date of delivery of the replacement letter of credit. (b) In the event of draw by the City on a letter of credit, the City may elect, in its sole and absolute discretion, to apply any such funds drawn to the obligations secured by such letter of credit or to hold such funds in an account under the control of the City, with no interest accruing thereon for the benefit of the Subdivider. If the City elects to hold the funds in an account pursuant to the foregoing, City may thereafter at any time elect instead to apply such funds as 46 01225.0006/366470.2
10 provided in the foregoing. Subdivider agrees and hereby grants City a security interest in such account to the extent required for City to realize on its interests therein and agrees to execute and deliver to City any other documents requested by City in order to evidence the creation and perfection of City’s security interest in such account.
4.5. Release of Security Instruments. The City shall release all Security Instruments consistent with Government Code Sections 66499.7 and 66499.8, Section 19.09.010 of the Chino Municipal Code, and as follows:
(a) City shall release the Faithful Performance Security Instrument and Labor and Materials Security Instrument when all of the following have occurred:
(i) Subdivider has made written request for release and provided evidence of satisfaction of all other requirements in this Section 4.5; (ii) the Works of Improvement have been accepted;
(iii) Subdivider has delivered the Maintenance and Warranty Security Instrument; and
(iv) after passage of the time within which lien claims are required to be made pursuant to Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code of the State of California. If lien claims have been timely filed, City shall hold the Labor and Materials Security Instrument until such claims have been resolved, Subdivider has provided a statutory bond, or otherwise as required by applicable law.
(b) City shall release the Maintenance and Warranty Security Instrument upon Subdivider’s written request upon the expiration of the warranty period, and settlement of any claims filed during the warranty period. (c) The City may retain from any security released, an amount sufficient to cover costs and reasonable expenses and fees, including reasonable attorney’s fees.
5. Cost of Construction and Provision of Inspection Service.
5.1. Subdivider Responsible for All Costs of Construction. Subdivider shall be responsible for payment of all costs incurred for construction and installation of the Works of Improvement. In the event Subdivider is entitled to reimbursement from City for any of the Works of Improvement, such reimbursement shall be subject to a separate Reimbursement Agreement to be entered into between Subdivider and City prior to construction of the Works of Improvement.
5.2. Payment to City for Cost of Related Inspection and Engineering Services.
Subdivider shall compensate City for all of City’s costs reasonably incurred in having its 47 01225.0006/366470.2
11 authorized representative make the usual and customary inspections of the Works of Improvement. In addition, Subdivider shall compensate City for all design, plan check, evaluating any proposed or agreed-upon changes in the work. The procedures for deposit and payment of such fees shall be as established by the City. In no event shall Subdivider be entitled to additional inspections or a final inspection and acceptance of any of the Works of Improvement until all City fees and charges have been fully paid, including without limitation, charges for applicable penalties and additional required inspections.
5.3. Payment of Development Impact Fees. Subdivider shall pay Development Impact Fees pursuant to and in accordance with Chino Municipal Code Chapter 3.40 or 3.45, as applicable.
6. Acceptance of Offers of Dedication. The City Council shall pass as appropriate resolution or resolutions accepting all offers of dedication shown on the Map for the Property, with acceptance to become effective upon completion and acceptance by City of the Works of Improvement. Such resolution(s) shall authorize the City Clerk to execute the Certificate made a part of the Map regarding said acceptance of the offer of dedication.
7. Warranty of Work. Subdivider shall guarantee all Works of Improvement against defective materials and workmanship for a period of one (1) year from the date of final acceptance. If any of the Works of Improvement should fail or prove defective within said one (1) year period due to any reason other than improper maintenance, or if any settlement of fill or backfill occurs, or should any portion of the Works of Improvement fail to fulfill any requirements of the Plans, Subdivider, within fifteen (15) days after written notice of such defects, or within such shorter time as may reasonably be determined by the City in the event of emergency, shall commence to repair or replace the same together with any other work which may be damaged or displaced in so doing. Should Subdivider fail to remedy defective material and/or workmanship or make replacements or repairs within the period of time set forth above, City may make such repairs and replacements and the actual cost of the required labor and materials shall be chargeable to and payable by Subdivider. The warranty provided herein shall not be in lieu of, but shall be in addition to, any warranties or other obligations otherwise imposed by law.
8. Default.
8.1. Default by Subdivider. Default by Subdivider shall include, but not be limited to:
(a) Subdivider’s failure to timely commence construction of Works of Improvement under this Agreement;
(b) Subdivider’s failure to timely complete construction of the Works of Improvement;
(c) Subdivider’s failure to perform substantial construction work for a period for 20 consecutive calendar days after commencement of the work; 48 01225.0006/366470.2
12 (d) Subdivider’s insolvency, appointment of a receiver, or the filing of any petition in bankruptcy, either voluntary or involuntary, which Subdivider fails to discharge within 30 days;
(e) The commencement of a foreclosure action against the subdivision or a portion thereof, or any conveyance in lieu or in avoidance of foreclosure; or (f) Subdivider’s failure to perform any other obligation under this Agreement.
8.2. Remedies. The City reserves all remedies available to it at law or in equity for a default or breach of Subdivider’s obligations under this Agreement. The City shall have the right, subject to this Section, to draw upon or use the appropriate security to mitigate the City’s damages in the event of default by Subdivider. The City’s right to draw upon or use the security is in addition to any other remedy available to City. The parties acknowledge that the estimated costs and security amounts may not reflect the actual cost of construction of the improvements and, therefore, City’s damages for Subdivider’s default shall be measured by the cost of completing the required improvements. The City may use the sums provided by the securities for the completion of the Works of Improvement in accordance with the plans. In the event the Subdivider fails to cure any default under this Agreement within 20 days after the City mails a notice of such default to the Subdivider and the Subdivider’s surety, Subdivider authorizes the City to perform the obligation for which Subdivider is in default and agrees to pay the entire cost of such performance by the City. The City may take over the work and complete the Works of Improvement, by contract or by any other method City deems appropriate, at the expense of the Subdivider. In such event, City, without liability for doing so, may complete the Works of Improvement using any of Subdivider’s materials, appliances, plans and other property that are at the work site and that are necessary to complete the Works of Improvement.
8.3. Remedies Not Exclusive. In any case where this Agreement provides a specific remedy to City for a default by Subdivider hereunder, the Subdivider agrees that the choice of remedy or remedies for Subdivider’s breach shall be in the discretion of the City. Additionally, any remedy specifically provided in this Agreement shall be in addition to, and not exclusive of, City’s right to pursue any other administrative, legal, or equitable remedy to which it may by entitled.
8.4. Attorney’s Fees and Costs. In the event that Subdivider fails to perform any obligation under this Agreement, Subdivider agrees to pay all costs and expenses incurred by City in securing performance of such obligations, including costs of suit and reasonable attorney’s fees. In the event of any dispute arising out of Subdivider’s performance of its obligations under this Agreement or under any of the Security Instruments referenced herein, the prevailing party in such action, in addition to any other relief which may be granted, shall be entitled to recover its reasonable attorney’s fees and costs. Such attorney’s fees and cost shall include fees and costs on any appeal, and in addition a party entitled to attorney’s fees and costs shall be entitled to all other reasonable costs incurred in investigating such action, taking depositions and discovery, retaining expert witnesses, and all other necessary and related costs with respect to the litigation. All such fees and costs shall be deemed to have 49 01225.0006/366470.2
13 accrued on commencement of the action and shall be enforceable whether or not the action is prosecuted to judgment.
8.5. Waiver. No waiver by the City of any breach or default by the Subdivider shall be considered valid unless in writing, and no such waiver by the City shall be deemed a waiver of any subsequent breach or default by the Subdivider.
9. Indemnity/Hold Harmless. City or any officer, employee or agent thereof shall not be liable for any injury to persons or property occasioned by reason of the acts or omissions of Subdivider, its agents, employees, contractors and subcontractors in the performance of this Agreement. Subdivider further agrees to protect, defend, indemnify and hold harmless City, its officials, boards and commissions, and members thereof, agents, and employees from any and all claims, demands, causes of action, liability or loss of any sort, because of, or arising out of, acts or omissions of Subdivider, its agents, employees, contractors and subcontractors in the performance of this Agreement, except for such claims, demands, causes of action, liability or loss arising out of the sole active negligence of the City, its officials, boards, commissions, the members thereof, agents and employees, including all claims, demands, causes of action, liability or loss because of or arising out of, in whole or in part, the design or construction of the improvements. This indemnification and agreement to hold harmless shall extend to injuries to persons and damages or taking of property resulting from the design or construction of said Subdivision, and the public improvements as provided herein, and in addition, to adjacent property owners as a consequence of the diversion of waters from the design and construction of public drainage systems, streets and other improvements.
Recordation of the Notice of Acceptance by the City of the Works of Improvements shall not constitute an assumption by the City of any responsibility for any damage or taking covered by this Section. City shall not be responsible for the design or construction of the property to be dedicated or the improvements pursuant to the approved improvement plans or map, regardless of any negligent action or inaction taken by the City in approving the plans or map, unless the particular improvement design was specifically required by City over written objection by Subdivider submitted to the City Engineer before approval of the particular improvement design, which objection indicated that the particular improvement design was dangerous or defective and suggested an alternative safe and feasible design.
After recordation of the Notice of Acceptance, the Subdivider shall remain obligated to eliminate any latent defect in design or dangerous condition caused by the design or construction defect for a period of one (1) year; however, Subdivider shall not be responsible for routine maintenance. It is the intent of this section that Subdivider shall be responsible for all liability for design and construction of the improvements installed or work done pursuant to this Agreement and that City shall not be liable for any negligence, nonfeasance, misfeasance or malfeasance in approving or reviewing any work or construction. The improvement security shall not be required to cover the provisions of this Paragraph.
Subdivider shall reimburse the City for all costs and expenses, including but not limited to fees and charges of architects, engineers, attorneys, and other professionals, and court costs, incurred by City in enforcing this Section.
50 01225.0006/366470.2
14 10. Subdivider’s Indemnity of Project Approval. Subdivider shall defend, indemnify, and hold harmless the City and its agents, officers, and employees from any claim, action, or proceeding against the City or its agents, officers, or employees to attack, set aside, void, or annul, an approval of the City, advisory agency, appeal board, or legislative body concerning the Subdivision. The City shall promptly notify the Subdivider of any claim, action, or proceeding and cooperate fully in the defense of any such claim, action, or proceeding. In the event City fails to promptly notify the Subdivider of any claim, action, or proceeding, or if the City fails to cooperate in the defense, the Subdivider shall not thereafter be responsible to defend, indemnify, or hold harmless the City. Nothing in this Section prohibits the City from participating in the defense of any claim, action, or proceeding if City bears its own attorney’s fees and costs and defends the action in good faith. Subdivider shall not be required to pay or perform any settlement unless the settlement is approved by the Subdivider.
11. Insurance Requirements. Subdivider, at Subdivider’s sole cost and expense and for the full term of this Agreement and any extensions thereto, shall obtain and maintain all of the following minimum insurance requirements in a form approved by the City’s authorized designee for Risk Management prior to commencing any work:
(a) Commercial General Liability policy with a minimum $1 million combined single limit for bodily injury and property damage providing all of the following minimum coverage without deductibles:
(i) Premises operations; including X, C, and U coverage; (ii) Owners’ and contractors’ protection;
(iii) Blanket contractual;
(iv) Completed operations; and
(v) Products.
(b) Commercial Business Auto policy with a minimum $1 million combined single limit for bodily injury and property damage, providing all of the following minimum coverage without deductibles:
(i) Coverage shall apply to any and all leased, owned, hired, or nonowned vehicles used in pursuit of any of the activities associated with this Agreement; and
(ii) Any and all mobile equipment including cranes which are not covered under the above Commercial Business Auto policy shall have said coverage provided under the Commercial General Liability policy. (c) Workers Compensation and Employers’ Liability policy in accordance with the laws of the State of California and providing coverage for any and all employees of the Subdivider:
51 01225.0006/366470.2
15 (i) This policy shall provide coverage for Workers’ Compensation (Coverage A); and
(i) This policy shall provide coverage for $1,000,000 Employers’ Liability (Coverage B).
(ii) Pursuant to Labor Code section 1861, Subdivider by executing this Agreement certifies: “I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract.”
(iii) Prior to commencement of work, the Subdivider shall file with the City’s Risk Manager a Certificate of Insurance or certification of permission to self-insure workers’ compensation conforming to the requirements of the Labor Code.
(d) Endorsements. All of the following endorsements are required to be made a part of each of the above-required policies as stipulated below:
(i) “The City of Chino, its officers, employees and agents are hereby added as additional insureds.”
(ii) “This policy shall be considered primary insurance with respect to any other valid and collectible insurance the City may possess, including any self- insured retention the City may have and any other insurance the City does possess shall be considered excess insurance only.”
(iii) “This insurance shall act for each insured and additional insured as though a separate policy has been written for each. This, however, will not act to increase the limit of the insuring company.” (iv) “Thirty (30) days prior written notice of cancellation shall be given to the City of Chino in the event of cancellation and/or reduction in coverage, except that ten (10) days prior written notice shall apply in the event of cancellation for non-payment of premium.” Such notice shall be sent to the Risk Manager at the address indicated in Subsection f below.
(v) Subsection d(iv) hereinabove “Cancellation Notice” is the only endorsement required of the Workers’ Compensation and Employers’ Liability policy.
52 01225.0006/366470.2
16 (e) Admitted Insurers. All insurance companies providing insurance to the Subdivider under this Agreement shall be admitted to transact the business of insurance by the California Insurance Commissioner.
(f) Proof of Coverage. Copies of all required endorsements shall be attached to the Certificate of Insurance which shall be provided by the Subdivider’s insurance company as evidence of the coverage required herein and shall be mailed to:
City of Chino
Risk Management
13220 Central Avenue
Chino, CA 91710
12. Environmental Warranty.
12.1. Prior to the acceptance of any dedications or Works of Improvement by City, Subdivider shall provide City with a written warranty in a form substantially similar to Exhibit “C” attached hereto and incorporated herein by reference, that:
(a) Neither the property to be dedicated nor Subdivider are in violation of any environmental law, and neither the property to be dedicated nor the Subdivider are subject to any existing, pending or threatened investigation by any federal, state or local governmental authority under or in connection with the environmental laws relating to the property to be dedicated. (b) Neither Subdivider nor any other person with Subdivider’s permission to be upon the property to be dedicated shall use, generate, manufacture, produce, or release, on, under, or about the property to be dedicated, any Hazardous Substance except in compliance with all applicable environmental laws. For the purposes of this Agreement, the term “Hazardous Substances” shall mean any substance or material which is capable of posing a risk of injury to health, safety or property, including all those materials and substances designated as hazardous or toxic by any federal, state or local law, ordinance, rule, regulation or policy, including but not limited to, all of those materials and substances defined as “Toxic Materials” in Sections 66680 through 66685 of Title 22 of the California Code of Regulations, Division 4, Chapter 30, as the same shall be amended from time to time, or any other materials requiring remediation under federal, state or local laws, ordinances, rules, regulations or policies. (c) Subdivider has not caused or permitted the release of and has no knowledge of the release or presence of any Hazardous Substance on the property to be dedicated or the migration of any hazardous substance from or to any other property adjacent to, or in the vicinity of, the property to be dedicated. (d) Subdivider’s prior and present use of the property to be dedicated has not resulted in the release of any hazardous substance on the property to be dedicated.
53 01225.0006/366470.2
17 12.2. Subdivider shall give prompt written notice to City of:
(a) Any proceeding or investigation by any federal, state or local governmental (b) authority with respect to the presence of any hazardous substance on the property to be dedicated or the migration thereof from or to any other property adjacent to, or in the vicinity of, the property to be dedicated. (c) Any claims made or threatened by any third party against City or the property to be dedicated relating to any loss or injury resulting from any hazardous substance; and
(d) Subdivider’s discovery of any occurrence or condition on any property adjoining or in the vicinity of the property to be dedicated that could cause the property to be dedicated or any part thereof to be subject to any restrictions on its ownership, occupancy, use for the purpose for which it is intended, transferability or suit under any environmental law.
13. General Provisions.
13.1. Successors and Assigns. This Agreement shall be binding upon all successors and assigns to Subdivider’s right, title, and interest in and to the Property and any portion thereof. Subdivider hereby consents to City recording this Agreement as official records of San Bernardino County, affecting fee title interest to the Property to provide constructive notice of the rights and obligations incurred by Subdivider in the City’s approval of this Agreement. In the event the Property is subsequently conveyed by Subdivider to a third party prior to completion of the Works of Improvement, whereby the third party is intended to assume Subdivider’s responsibilities with regard to this Agreement, (the “Replacement Subdivider”), the rights and obligations of this Agreement shall transfer to the Replacement Subdivider; however, the Security Instruments required pursuant to Section 4 of this Agreement, and furnished by Subdivider as a condition of the City’s approval of this Agreement, shall remain Subdivider’s responsibility to maintain until such time as Subdivider and its Replacement Subdivider enter into a Transfer and Assignment of Subdivision Agreement, (the “Transfer Agreement”), to acknowledge the transfer of fee title to the Property from the Subdivider to its Replacement Subdivider, and to acknowledge the rights and obligations associated with this Agreement upon the Replacement Subdivider, including Replacement Subdivider’s responsibility to furnish replacement Security Instruments meeting the City’s approval pursuant to Section 4 of this Agreement. Until such time as a Transfer Agreement, meeting the City’s approval, is executed by Subdivider and its Replacement Subdivider, and replacement Security Instruments meeting City’s approval are furnished by the Replacement Subdivider, Subdivider retains sole responsibility for maintaining all Security Instruments required pursuant to Section 4 of this Agreement.
13.2. No Third-Party Beneficiaries. This Agreement is intended to benefit only the parties hereto and their respective successors and assigns. Neither City nor Subdivider intend to create any third-party beneficiary rights in this Agreement in any contractor, subcontractor, member of the general public, or other person or entity. 54 01225.0006/366470.2
18 13.3. No Vesting Rights. Performance by the Subdivider of this Agreement shall not be construed to vest Subdivider’s rights with respect to any change in any zoning or building law or ordinance.
13.4. Subdivider is Not Agent of City. Neither Subdivider nor Subdivider’s agents, contractors, or subcontractors are agents or contractors of the City in connection with the performance of Subdivider’s obligations under this Agreement.
13.5. Time of the Essence. Time is of the essence of Subdivider’s performance of all of its obligations under this Agreement.
13.6. Notices. Unless otherwise specified in this Agreement, all notices required or provided for under this Agreement shall be in writing and delivered in person or sent by mail, postage prepaid and addressed as provided in this Section. Notice shall be effective on the date is delivered in person, or, if mailed, on the date of deposit in the United States Mail.
Notice shall be provided to the persons listed on Pages 1 and 2 of this Agreement by the parties for this purpose.
Either party may provide a new designated representative and/or address by written notice as provided in this Section.
13.7. No Apportionment. Nothing contained in this Agreement shall preclude City from expending monies pursuant to agreements concurrently or previously executed between the parties, or from entering into agreements with other subdividers for the apportionment of costs of water and sewer mains, or other improvements pursuant to the provisions of the City ordinances providing, therefore. Nor shall anything in the Agreement commit City to any such apportionment.
13.8. Severability. If any portion of this Agreement is held invalid by a court of competent jurisdiction, the remainder of the Agreement shall remain in full force and effect unless amended or modified by mutual written consent of the parties.
13.9. Captions. The captions of this Agreement are for convenience and reference only and shall not be used in the interpretation of any provision of this Agreement.
13.10. Incorporation of Recitals. The recitals to this Agreement are hereby incorporated into the terms of this Agreement.
13.11. Interpretation. This Agreement shall be interpreted in accordance with the laws of the State of California.
13.12. Entire Agreement; Waivers and Amendments. This Agreement integrates all of the terms and conditions mentioned herein, or incidental hereto, and supersedes all negotiations and previous agreements between the parties with respect to all or part of the subject matter hereof, except as may be expressly provided herein. All waivers of the provisions of this Agreement must be in writing and signed by an authorized representative of the party to be charged, and all amendments hereto must be in writing and signed by the appropriate representatives of both parties.
55 01225.0006/366470.2
19 13.13. Counterparts. This Agreement may be executed in one or more counterparts, all of which taken together shall be deemed one original.
14. Authority. The persons executing this Agreement on behalf of the parties warrant the (I) party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into of this Agreement does not violate any provisions of any other agreement to which said party is bound. [SIGNATURES ON NEXT PAGE]
56 01225.0006/366470.2
20 IN WITNESS WHEREOF, the City and the Subdivider have caused this Agreement to be executed the day and year first above written.
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
___________________________ _____________________________ Fred Galante, City Attorney Hye Jin Lee, P.E.
Director of Public Works
LENNAR HOMES OF CALIFORNIA, LLC,
By: __________________________
Its: Authorized Agent
Geoffrey Smith
CITY OF CHINO
Dr. Linda Reich, City Manager
Date:
ATTEST:
By
Natalie Gonzaga, City Clerk
Dated: ___________________________
57 01225.0006/366470.2
58 01225.0006/366470.2 A-1
EXHIBIT “A”
[attached]
59 60
01225.0006/366470.2 B-1
EXHIBIT “B”
TENTATIVE TRACT MAP 16420-6 (LOTS 2 &3) WORKS OF IMPROVEMENT A. Removal of undesirable, dangerous and dead plant materials and roots.
B. All onsite and offsite grading as specified on the approved grading plan.
C. Relocation of all public utility structures as necessary to properly construct the required improvements.
D. Storm drain facilities as required and shown on the approved construction plans and in accordance with City Standards.
E. Sanitary sewers constructed as shown on the approved, engineered plans and in accordance with City Standards.
F. Water mains, valves, hydrants, services, meters and appurtenances to serve each lot as shown on the approved construction plans and in accordance with City Standards.
G. Underground installation of all electrical, telephone, cable television and any other energy or communication lines that abut or are within the project site.
H. A street lighting system (City-owned) in accordance with City Standards.
I. Disposal of all rocks and debris located within any public right-of-way within said development or on the boundary streets thereof.
J. Installation of concrete curbs, gutters, sidewalks, cross gutters, driveways and intersections as shown on approved construction plans and in accordance with City Standards.
K. Installation of asphalt concrete or Portland Cement Concrete street pavement on base material as shown on approved construction plans and in accordance with City Standards.
L. Street signs at intersections per the City Standards.
M. Installation of approved landscaping (plants and materials).
N. Setting monuments as required by the State Code.
The Subdivider shall also perform all work and furnish all materials necessary, in the opinion of the Director of Development Services or his designee and on his order, to complete the improvements in accordance with the plans and specifications on file as hereinbefore specified, or any changes required or ordered by said Engineer which, in his opinion, are necessary or required to complete this work. 61 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
EA Tree Removal $ 800.00 $ -
17 CY Concrete Removal $ 325.00 $ 5,525.00
131 CY AC Pavement Removal $ 100.00 $ 13,100.00
CY Imported Common Fill (Incl. Compaction) $ 34.00 $ -
SF Preparation of Subgrade, Sidewalk and Paving $ 1.00 $ - 3513 LF PCC 8" Curb & 24" Gutter on 6" AB $ 26.00 $ 91,338.00 4182 LF PCC 6" Curb & 24" Gutter on 6" AB $ 24.00 $ 100,368.00 4391 LF PCC Curb Only $ 20.00 $ 87,820.00
LF 8" A.C. Berm $ 20.00 $ -
240 SF 8" PCC Cross Gutter on 6" AB $ 16.00 $ 3,840.00
66375 SF 4" PCC Sidewalk $ 5.80 $ 384,975.00
1021 SF 6" PCC Thick Pavement on 6" AB $ 12.50 $ 12,762.50 SF 8" PCC Thick Drive Approach on 6" AB $ 15.00 $ -
LF 2" x 6" Redwood Header $ 7.50 $ -
EA Street Sign and Post $ 475.00 $ -
EA Traffic Sign and Post $ 400.00 $ -
EA Reflector Sign and Post $ 175.00 $ -
EA Painted Legend $ 6.50 $ -
SF Prime or Tack Coat $ 0.08 $ -
TON AC Variable - <300T $ 130.00 $ -
TON 4,399 AC Variable - >300T $ 120.00 $ 527,880.00
TON CAB Variable - <300T $ 100.00 $ -
TON 5,005 CAB Variable - >300T $ 90.00 $ 450,450.00
EngCostEstimate Page 1 of 10 Effective Date: January 1, 2021 62 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
24 EA Adjust Sewer Manhole to Grade $ 950.00 $ 22,800.00 EA Adjust Sewer Cleanout to Grade $ 500.00 $ -
42 EA Adjust Water Valve and Can to Grade $ 525.00 $ 22,050.00 26 EA Street Light $ 7,700.00 $ 200,200.00
1 EA Electrical Pedestal $ 6,500.00 $ 6,500.00
EA Lot Monument Setting Fee $ 550.00 $ -
LF Sawcut A.C. $ 3.00 $ -
LF Sawcut Concrete $ 3.00 $ -
SF Cold Plane A.C. 2" Thick $ 0.28 $ -
Signing & Striping for
LF Arterial $ 19.00 $ -
3225 LF Collector $ 13.00 $ 41,925.00
LF Local $ 7.00 $ -
EA Traffic Signal (8 - Phase Controller) $ 350,000.00 $ - EA Modify existing Traffic Signal per Quadrant $ 75,000.00 $ - LF Chain Link Fence
4 foot Residential Grade (Add $7.00/LF for Removal
of Existing Fence) $ - 25.00 $
6 foot School fence (Add $9.00/LF for Removal of
Existing Fence) $ - 35.00 $
EA Utility Poles
Transmission $ 11,500.00 $ -
Distribution $ 8,000.00 $ -
Service $ 3,000.00 $ -
EngCostEstimate Page 2 of 10 Effective Date: January 1, 2021 63 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
SF
Landscape (Including shrubs, Hardscape, Irrigation,
Ground Cover, Lighting, Installation Labor and Connection to Existing Systems) $ - 15.00 $
LF
14 foot Median with Landscape, Irrigation, Lighting,
Hardscape, Curb, Gutter & Pavement $ - 300.00 $
Rail Road Crossing
LS
Safety Equipment (Complete Including Crossing
Gates, Signs, and Lights) $ - 500,000.00 $
SF Track Crossing (Concrete) $ 175.00 $ -
SF Approach $ 4.00 $ -
36 EA S.W. Ramps (A.D.A. Compliant) $ 4,000.00 $ 144,000.00 EA Traffic Signal Loops $ 600.00 $ -
SF 691 4" to 6" Fresno River Cobble Pavement $ 10.00 $ 6,910.00 LF 148 Metal Beam Guard Rail $ 70.00 $ 10,360.00
STREETS
STREET SUBTOTAL 2,132,803.50 $
LS Mobilzation (5% of Construction Cost) 5% 106,640.18 $ LS Traffic Control (5% of Construction Cost) 5% $ 106,640.18 LS Clear & Grub Site (5% of Construction Cost) 5% $ 106,640.18 LS Excavation (Clean Material) (5% of Construction Cost) 5% 106,640.18 $ GRAND TOTAL STREETS ONLY $ 2,559,364.20
EngCostEstimate Page 3 of 10 Effective Date: January 1, 2021 64 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
WATER
LF Trench Support/Shoring (6 foot depth) $ 15.00 $ -
CY Pipe Bedding & Compaction (Imported) $ 90.00 $ -
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ - 80.00 $
275 LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ 27,500.00 100.00 $ 3101 LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ 418,635.00 135.00 $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 175.00 $ LF Removal, Disposal of ACP and Backfill $ 150.00 $ -
EA 6" Gate Valve $ 2,000.00 $ -
5 EA 8" Gate Valve $ 2,600.00 $ 13,000.00
11 EA 12" Gate Valve $ 4,500.00 $ 49,500.00
EA 18" Gate Valve $ 7,500.00 $ -
6 EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ 45,000.00 7 EA Blow-off Assembly 4" per City Std. $ 8,600.00 $ 60,200.00 EA 2" Air Relief Assembly $ 4,500.00 $ -
EA 1" Water Service/Meter $ 3,500.00 $ -
EA 2" Water Service/Meter $ 4,500.00 $ -
WATER
WATER SUBTOTAL $ 613,835.00
LS Mobilzation (5% of Construction Cost) 5% $ 30,691.75 LS Traffic Control (5% of Construction Cost) 5% 30,691.75 $ GRAND TOTAL WATER ONLY $ 675,218.50
EngCostEstimate Page 4 of 10 Effective Date: January 1, 2021 65 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
RECYCLED WATER
LF Trench Support/Shoring (6 foot depth) $ 15.00 $ -
CY Pipe Bedding (Imported) $ 90.00 $ -
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ - 80.00 $
3182 LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ 318,200.00 100.00 $ LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 135.00 $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 175.00 $ EA 6" Gate Valve $ 2,000.00 $ -
10 EA 8" Gate Valve $ 2,600.00 $ 26,000.00
EA 12" Gate Valve $ 4,500.00 $ -
EA 18" Gate Valve $ 7,500.00 $ -
EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ -
4 EA Blow-off Assembly 5" per City Std. $ 8,600.00 $ 34,400.00 1 EA 2" Air Relief Assembly $ 4,500.00 $ 4,500.00
EA 1" Water Service/Meter $ 3,500.00 $ -
EA 2" Water Service/Meter $ 4,500.00 $ -
RECYCLED WATER
RECYCLED WATER SUBTOTAL $ 383,100.00
LS Mobilzation (5% of Construction Cost) 5% $ 19,155.00 LS Traffic Control (5% of Construction Cost) 5% 19,155.00 $ GRAND TOTAL RECYCLED WATER ONLY $ 421,410.00
EngCostEstimate Page 5 of 10 Effective Date: January 1, 2021 66 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
SEWER
LF Trench Support/Shoring $ 15.00 $ -
LF
4" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $75.00 - $
LF
8" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $93.00 - $
LF
10" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $103.00 - $
LF
12" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $123.00 - $
LF
15" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $143.00 - $
LF
18" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $163.00 - $
LF
21" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $193.00 - $
LF
24" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $208.00 - $
EA Sewer Saddle $450.00 $ -
EA Wyes 4" x 8" Typical $225.00 $ -
EA 48" Sewer Manhole $4,700.00 $ -
EA 60" Sewer Manhole $7,500.00 $ -
EA Sewer Cleanout $1,800.00 $ -
SEWER
SEWER SUBTOTAL $ -
LS Mobilization (5% of Construction Cost) 5% $ -
LS Traffic Control (5% of Construction Cost) 5% - $
GRAND TOTAL SEWER ONLY $ -
EngCostEstimate Page 6 of 10 Effective Date: January 1, 2021 67 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STORM DRAIN
LF 24" X 36" C.M.P.A. (10 Gauge) $ 230.00 $ -
LF 27" x 43" C.M.P.A (10 Gauge) $ 250.00 $ -
17 EA Storm Drain Manhole #1 $ 10,000.00 $ 170,000.00
EA Junction Structure #2 (24" or larger) $ 8,850.00 $ - 4 EA Junction Structure #4 (24" or smaller) $ 4,000.00 $ 16,000.00 EA Outlet Structure $ 7,000.00 $ -
22 EA Catch Basin 3.5' Width $ 7,200.00 $ 158,400.00
EA Catch Basin 7' Width/L.D. $ 7,900.00 $ -
EA Catch Basin 10' Width/L.D. $ 9,950.00 $ -
EA Catch Basin 14' Width/L.D. $ 11,000.00 $ -
EA Catch Basin 21' Width/L.D. $ 13,000.00 $ -
LF
18 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 200.00 $
2002 LF
24 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ 480,480.00 240.00 $ LF
27 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 260.00 $
LF
30 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 280.00 $
LF
33 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 295.00 $
LF
36 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 310.00 $
LF
39 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 320.00 $
1589 LF
42 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ 524,370.00 330.00 $ LF
45 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 360.00 $
169 LF
48 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ 65,065.00 385.00 $
LF
54 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 440.00 $
LF
60 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 500.00 $
EngCostEstimate Page 7 of 10 Effective Date: January 1, 2021 68 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STORM DRAIN
LF
66 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 560.00 $
LF
72 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 625.00 $
LF
78 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 690.00 $
LF
84 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 765.00 $
LF
90 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 830.00 $
LF
96 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 920.00 $
LF
102 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
LF
108 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,075.00 $
LF
7' x 6' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 700.00 $
LF
7' x 8.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ - 820.00 $
LF
7' x 9.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ - 870.00 $
LF
8' x 11' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
LF
8' x 13' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,100.00 $
LF
9' x 9' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
2 EA 24" CMP Riser $ 1,250.00 $ 2,500.00
77 LF 24" CSP Pipe $ 200.00 $ 15,400.00
3 EA PIPE END CAPS $ 200.00 $ 600.00
42 LF 8" HDPE N12 DRAIN PIPE $ 50.00 $ 2,100.00
STORM DRAIN
STORM DRAIN SUBTOTAL $ 1,434,915.00
LS Mobilization (5% of Construction Cost) 5% 71,745.75 $ LS Traffic Control (5% of Construction Cost) 5% 71,745.75 $ GRAND TOTAL STORM DRAIN ONLY $ 1,578,406.50
EngCostEstimate Page 8 of 10 Effective Date: January 1, 2021 69 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
DIRECT COSTS GRAND TOTAL STREETS ONLY 2,559,364.20 $
GRAND TOTAL WATER ONLY $ 675,218.50
GRAND TOTAL RECYCLED WATER ONLY $ 421,410.00
GRAND TOTAL SEWER ONLY $ -
GRAND TOTAL STORM DRAIN ONLY $ 1,578,406.50
GRAND TOTAL (FOR PLAN CHECK & INSPECTION FEE
DETERMINATION) $ 5,234,399.20
PROJECT ADDITIVES Project Contingencies 10% $ 523,439.92 Construction Staking 3% $ 157,031.98
Soils Testing 1% $ 52,343.99
Material Testing 1% $ 52,343.99
Construction Inspection 4.8% $ 251,251.16
Contract Administration 1% $ 52,343.99
GRAND TOTAL (FOR BOND AMOUNTS) $ 6,323,154.23
Faithful Performance Bond (100% of Construction Cost)
Labor & Material Bond (50% of Construction Cost)
Warranty Bond (10% of Construction Cost)
EngCostEstimate Page 9 of 10 Effective Date: January 1, 2021 70 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
C. Berard
45183
BY ENGINEER
Prepared By:
R.C.E. Number:
Expiration:
Place R.C.E. Stamp and Signature Here (required)
BY CITY
$ 6,323,200.00
$ 3,161,600.00
$ 632,300.00
Faithful Performance Bond (100% of Construction Cost)
Labor & Material Bond (50% of Construction Cost)
Warranty Bond (10% of Construction Cost)
EngCostEstimate Page 10 of 10 Effective Date: January 1, 2021 71 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
EA Tree Removal $ 800.00 $ -
CY Concrete Removal $ 325.00 $ -
CY AC Pavement Removal $ 100.00 $ -
CY Imported Common Fill (Incl. Compaction) $ 34.00 $ -
SF Preparation of Subgrade, Sidewalk and Paving $ 1.00 $ - LF PCC 8" Curb & 24" Gutter on 6" AB $ 26.00 $ -
LF PCC 6" Curb & 24" Gutter on 6" AB $ 24.00 $ -
LF PCC Curb Only $ 20.00 $ -
LF 8" A.C. Berm $ 20.00 $ -
SF 8" PCC Cross Gutter on 6" AB $ 16.00 $ -
66375 SF 4" PCC Sidewalk $ 5.80 $ 384,975.00
SF 6" PCC Thick Pavement on 6" AB $ 12.50 $ -
SF 8" PCC Thick Drive Approach on 6" AB $ 15.00 $ -
LF 2" x 6" Redwood Header $ 7.50 $ -
EA Street Sign and Post $ 475.00 $ -
EA Traffic Sign and Post $ 400.00 $ -
EA Reflector Sign and Post $ 175.00 $ -
EA Painted Legend $ 6.50 $ -
SF Prime or Tack Coat $ 0.08 $ -
TON AC Variable - <300T $ 130.00 $ -
TON AC Variable - >300T $ 120.00 $ -
TON CAB Variable - <300T $ 100.00 $ -
TON CAB Variable - >300T $ 90.00 $ -
EngCostEstimate Page 1 of 10 Effective Date: January 1, 2021 72 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
24 EA Adjust Sewer Manhole to Grade $ 950.00 $ 22,800.00 EA Adjust Sewer Cleanout to Grade $ 500.00 $ -
42 EA Adjust Water Valve and Can to Grade $ 525.00 $ 22,050.00 26 EA Street Light (Install only. SLs are purchased) $ 3,000.00 $ 78,000.00 EA Electrical Pedestal $ 6,500.00 $ -
EA Lot Monument Setting Fee $ 550.00 $ -
LF Sawcut A.C. $ 3.00 $ -
LF Sawcut Concrete $ 3.00 $ -
SF Cold Plane A.C. 2" Thick $ 0.28 $ -
Signing & Striping for
LF Arterial $ 19.00 $ -
3225 LF Collector $ 13.00 $ 41,925.00
LF Local $ 7.00 $ -
EA Traffic Signal (8 - Phase Controller) $ 350,000.00 $ - EA Modify existing Traffic Signal per Quadrant $ 75,000.00 $ - LF Chain Link Fence
4 foot Residential Grade (Add $7.00/LF for Removal
of Existing Fence) $ - 25.00 $
6 foot School fence (Add $9.00/LF for Removal of
Existing Fence) $ - 35.00 $
EA Utility Poles
Transmission $ 11,500.00 $ -
Distribution $ 8,000.00 $ -
Service $ 3,000.00 $ -
EngCostEstimate Page 2 of 10 Effective Date: January 1, 2021 73 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
SF
Landscape (Including shrubs, Hardscape, Irrigation,
Ground Cover, Lighting, Installation Labor and Connection to Existing Systems) $ - 15.00 $
LF
14 foot Median with Landscape, Irrigation, Lighting,
Hardscape, Curb, Gutter & Pavement $ - 300.00 $
Rail Road Crossing
LS
Safety Equipment (Complete Including Crossing
Gates, Signs, and Lights) $ - 500,000.00 $
SF Track Crossing (Concrete) $ 175.00 $ -
SF Approach $ 4.00 $ -
36 EA S.W. Ramps (A.D.A. Compliant) $ 4,000.00 $ 144,000.00 EA Traffic Signal Loops $ 600.00 $ -
SF 691 4" to 6" Fresno River Cobble Pavement $ 10.00 $ 6,910.00 LF 148 Metal Beam Guard Rail $ 70.00 $ 10,360.00
1 EA Final Punchlist Work $ 25,000.00 $ 5,000.00
STREETS
STREET SUBTOTAL 716,020.00 $
LS Mobilzation (5% of Construction Cost) 5% - $
LS Traffic Control (5% of Construction Cost) 5% $ -
LS Clear & Grub Site (5% of Construction Cost) 5% $ -
LS Excavation (Clean Material) (5% of Construction Cost) 5% - $ GRAND TOTAL STREETS ONLY $ 716,020.00
EngCostEstimate Page 3 of 10 Effective Date: January 1, 2021 74 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
WATER
LF Trench Support/Shoring (6 foot depth) $ 15.00 $ -
CY Pipe Bedding & Compaction (Imported) $ 90.00 $ -
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ - 80.00 $
LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ - 100.00 $
LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 135.00 $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 175.00 $ LF Removal, Disposal of ACP and Backfill $ 150.00 $ -
EA 6" Gate Valve $ 2,000.00 $ -
EA 8" Gate Valve $ 2,600.00 $ -
EA 12" Gate Valve $ 4,500.00 $ -
EA 18" Gate Valve $ 7,500.00 $ -
EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ -
EA Blow-off Assembly 4" per City Std. $ 8,600.00 $ -
EA 2" Air Relief Assembly $ 4,500.00 $ -
EA 1" Water Service/Meter $ 3,500.00 $ -
EA 2" Water Service/Meter $ 4,500.00 $ -
1 EA Final Punchlist Work $ 25,000.00 $ 25,000.00
WATER
WATER SUBTOTAL $ 25,000.00
LS Mobilzation (5% of Construction Cost) 0% $ -
LS Traffic Control (5% of Construction Cost) 0% - $
GRAND TOTAL WATER ONLY $ 25,000.00
EngCostEstimate Page 4 of 10 Effective Date: January 1, 2021 75 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
RECYCLED WATER
LF Trench Support/Shoring (6 foot depth) $ 15.00 $ -
CY Pipe Bedding (Imported) $ 90.00 $ -
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ - 80.00 $
LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ - 100.00 $
LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 135.00 $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 175.00 $ EA 6" Gate Valve $ 2,000.00 $ -
EA 8" Gate Valve $ 2,600.00 $ -
EA 12" Gate Valve $ 4,500.00 $ -
EA 18" Gate Valve $ 7,500.00 $ -
EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ -
EA Blow-off Assembly 5" per City Std. $ 8,600.00 $ -
EA 2" Air Relief Assembly $ 4,500.00 $ -
EA 1" Water Service/Meter $ 3,500.00 $ -
EA 2" Water Service/Meter $ 4,500.00 $ -
1 EA Final Punchlist Work $ 25,000.00 $ 25,000.00
RECYCLED WATER
RECYCLED WATER SUBTOTAL $ 25,000.00
LS Mobilzation (5% of Construction Cost) 0% $ -
LS Traffic Control (5% of Construction Cost) 0% - $
GRAND TOTAL RECYCLED WATER ONLY $ 25,000.00
EngCostEstimate Page 5 of 10 Effective Date: January 1, 2021 76 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
SEWER
LF Trench Support/Shoring $ 15.00 $ -
LF
4" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $75.00 - $
LF
8" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $93.00 - $
LF
10" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $103.00 - $
LF
12" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $123.00 - $
LF
15" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $143.00 - $
LF
18" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $163.00 - $
LF
21" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $193.00 - $
LF
24" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $208.00 - $
EA Sewer Saddle $450.00 $ -
EA Wyes 4" x 8" Typical $225.00 $ -
EA 48" Sewer Manhole $4,700.00 $ -
EA 60" Sewer Manhole $7,500.00 $ -
EA Sewer Cleanout $1,800.00 $ -
1 EA Final Punchlist Work $ 25,000.00 $ 25,000.00
SEWER
SEWER SUBTOTAL $ 25,000.00
LS Mobilization (5% of Construction Cost) 0% $ -
LS Traffic Control (5% of Construction Cost) 0% - $
GRAND TOTAL SEWER ONLY $ 25,000.00
EngCostEstimate Page 6 of 10 Effective Date: January 1, 2021 77 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STORM DRAIN
LF 24" X 36" C.M.P.A. (10 Gauge) $ 230.00 $ -
LF 27" x 43" C.M.P.A (10 Gauge) $ 250.00 $ -
EA Storm Drain Manhole #1 $ 10,000.00 $ -
EA Junction Structure #2 (24" or larger) $ 8,850.00 $ - EA Junction Structure #4 (24" or smaller) $ 4,000.00 $ - EA Outlet Structure $ 7,000.00 $ -
EA Catch Basin 3.5' Width $ 7,200.00 $ -
EA Catch Basin 7' Width/L.D. $ 7,900.00 $ -
EA Catch Basin 10' Width/L.D. $ 9,950.00 $ -
EA Catch Basin 14' Width/L.D. $ 11,000.00 $ -
EA Catch Basin 21' Width/L.D. $ 13,000.00 $ -
LF
18 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 200.00 $
LF
24 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 240.00 $
LF
27 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 260.00 $
LF
30 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 280.00 $
LF
33 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 295.00 $
LF
36 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 310.00 $
LF
39 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 320.00 $
LF
42 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 330.00 $
LF
45 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 360.00 $
LF
48 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 385.00 $
LF
54 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 440.00 $
LF
60 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 500.00 $
EngCostEstimate Page 7 of 10 Effective Date: January 1, 2021 78 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STORM DRAIN
LF
66 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 560.00 $
LF
72 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 625.00 $
LF
78 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 690.00 $
LF
84 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 765.00 $
LF
90 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 830.00 $
LF
96 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 920.00 $
LF
102 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
LF
108 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,075.00 $
LF
7' x 6' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 700.00 $
LF
7' x 8.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ - 820.00 $
LF
7' x 9.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ - 870.00 $
LF
8' x 11' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
LF
8' x 13' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,100.00 $
LF
9' x 9' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
EA 24" CMP Riser $ 1,250.00 $ -
LF 24" CSP Pipe $ 200.00 $ -
EA PIPE END CAPS $ 200.00 $ -
LF 8" HDPE N12 DRAIN PIPE $ 50.00 $ -
1 EA Final Punchlist Work $ 25,000.00 $ 25,000.00
STORM DRAIN
STORM DRAIN SUBTOTAL $ 25,000.00
LS Mobilization (5% of Construction Cost) 0% - $
LS Traffic Control (5% of Construction Cost) 0% - $
GRAND TOTAL STORM DRAIN ONLY $ 25,000.00
EngCostEstimate Page 8 of 10 Effective Date: January 1, 2021 79 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
DIRECT COSTS GRAND TOTAL STREETS ONLY 716,020.00 $
GRAND TOTAL WATER ONLY $ 25,000.00
GRAND TOTAL RECYCLED WATER ONLY $ 25,000.00
GRAND TOTAL SEWER ONLY $ 25,000.00
GRAND TOTAL STORM DRAIN ONLY $ 25,000.00
GRAND TOTAL (FOR PLAN CHECK & INSPECTION FEE
DETERMINATION) $ 816,020.00
PROJECT ADDITIVES Project Contingencies 10% $ 81,602.00 Construction Staking 3% $ 24,480.60
Soils Testing 1% $ 8,160.20
Material Testing 1% $ 8,160.20
Construction Inspection 4.8% $ 39,168.96
Contract Administration 1% $ 8,160.20
GRAND TOTAL (FOR BOND AMOUNTS) $ 985,752.16
Faithful Performance Bond (100% of Construction Cost) $ 0.24 Labor & Material Bond (50% of Construction Cost)
Warranty Bond (10% of Construction Cost)
EngCostEstimate Page 9 of 10 Effective Date: January 1, 2021 80 RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
C. Berard
45183
BY ENGINEER
Prepared By:
R.C.E. Number:
Expiration:
Place R.C.E. Stamp and Signature Here (required)
BY CITY
$ 985,800.00
$ 492,900.00
$ 98,600.00
Faithful Performance Bond (100% of Construction Cost)
Labor & Material Bond (50% of Construction Cost)
Warranty Bond (10% of Construction Cost)
EngCostEstimate Page 10 of 10 Effective Date: January 1, 2021 81 82
Block 11
Backbone Street
Bond
Block 11 Sewer,
SD,Water,RW
Bond
Block 11
Backbone
Street Bond
(Reduction)
Block 11 Sewer,
SD,Water,RW
Bond
(Reduction) Street Bond Wets Bond
Street Bond
(Reduced)
Wets Bond
(Reduced) Street Bond Wets Bond
Street Bond
(Reduced)
Wets Bond
(Reduced) - Street Bond Wets Bond
Street Bond
(Reduced)
Wets Bond
(Reduced) Street Bond Wets Bond
Street Bond
(Reduced)
Wets Bond
(Reduced) -
Faithful Performance
Bond (100% of
Construction Cost) $ 3,103,741.72 $ 3,219,412.52 $ 748,020.00 24.10% $ 643,882.50 20.00% $ 524,114.18 $ 644,326.42 $ 143,660.21 27.41% $ 128,865.28 20.00% $ 1,823,954.24 $ 2,364,010.78 $ 545,587.05 29.91% $ 472,802.16 $ 109,117.41 $ 727,098.06 $ 1,023,881.48 $ 186,670.00 25.67% $ 204,776.30 20.00% $ 1,007,104.00 $ 1,182,212.06 $ 285,209.40 28.32% $ 236,442.41 $ 57,041.88 Labor & Material Bond
(50% of Construction
Cost) $ 1,551,870.86 $ 1,609,706.26 $ 374,010.00 24.10% $ 321,941.25 20.00% $ 262,057.09 $ 322,163.21 $ 71,830.11 27.41% $ 64,432.64 20.00% $ 911,977.12 $ 1,182,005.39 $ 272,793.53 29.91% $ 236,401.08 $ 54,558.71 $ 363,549.03 $ 511,940.74 $ 93,335.00 25.67% $ 102,388.15 20.00% $ 503,552.00 $ 591,106.03 $ 142,604.70 28.32% $ 118,221.21 $ 28,520.94 Warranty Bond (10% of
Construction Cost) $ 310,374.17 $ 321,941.25 $ 310,374.17 100.00% $ 321,941.25 100.00% $ 52,411.42 $ 64,432.64 $ 52,411.42 100.00% $ 64,432.64 100.00% $ 182,395.42 $ 236,401.08 $ 182,395.42 100.00% $ 236,401.08 $ 182,395.42 $ 72,709.81 $ 102,388.15 $ 72,709.81 100.00% $ 102,388.15 100.00% $ 100,710.40 $ 118,221.21 $ 100,710.40 100.00% $ 118,221.21 $ 100,710.40 Bond# 24282451 24282446 24282453 24282448 24282452 24282447 24282455 24282450 24252454 24282449 Description
16420-6 OnsiteLot 2 & 3 Intract
Street Imps
16420-6 OnsiteLot 2 & 3
Intract
16420-6 Onsite- Lot
4 & 7 Intract
Street Imps
16420-6 OnsiteLot 4 & 7 Intract
Wet Util.
16420-6 OnsiteLot 5,6 & 8
Intract
16420-6 OnsiteLot 5,6 & 8
Intract Wet Util.
16420-6 OnsiteLot 9 Intract
Street Imps
16420-6 OnsiteLot 9 Intract
Wet Util. Imps
Lennar Shea Homes Richmond American Beazer
Note: Cells in green highlight represent values in which estimated remaining costs are less than 20% of initial bond amount per the prior tabs. Values set at 20% of original bond amount Backbone Lots 2 & 3 Lots 4 & 7 Lots 5,6,8 Lot 9
83 84
85 86
87 88
89 90
91 01225.0006/366470.2 C-1
EXHIBIT “C”
TRACT NO. 16420-6 (LOTS 2 & 3)
LENNAR HOMES OF CALIFORNIA, LLC
ENVIRONMENTAL WARRANTY
As a condition precedent to acceptance of the dedications and public improvements to be conveyed by the above-named Subdivider to the City of Chino for the above-referenced Subdivision, Subdivider hereby warrants to the City of Chino that:
1. Neither the property to be dedicated nor Subdivider are in violation of any environmental law, and neither the property to be dedicated nor the Subdivider are subject to any existing, pending or threatened investigation by any federal, state or local governmental authority under or in connection with the environmental laws relating to the property to be dedicated.
2. Neither Subdivider nor any other person with Subdivider’s permission to be upon the property to be dedicated has used, generated, manufactured, produced, or released, on, under, or about the property to be dedicated, any Hazardous Substance except in compliance with all applicable environmental laws. For the purposes of this warranty, the term “Hazardous Substances” shall mean any substance or material which is capable of posing a risk of injury to health, safety or property, including all those materials and substances designated as hazardous or toxic by any federal, state or local law, ordinance, rule, regulation or policy, including but not limited to, all of those materials and substances defined as “Toxic Materials” in Sections 66680 through 66685 of Title 22 of the California Code of Regulations, Division 4, Chapter 30, as the same shall be amended from time to time, or any other materials requiring remediation under federal, state or local laws, ordinances, rules, regulations or policies.
3. Subdivider has not caused or permitted the release of and has no knowledge of the release or presence of any Hazardous Substance on the property to be dedicated or the migration of any hazardous substance from or to any other property adjacent to, or in the vicinity of, the property to be dedicated.
4. Subdivider’s prior and present use of the property to be dedicated has not resulted in the release of any Hazardous Substance on the property to be dedicated.
5. All persons executing this warranty hereby represent and warrant to the City of Chino, and Subdivider hereby represents and warrants, that the signators hereto have the legal power, right and authority to execute this warranty on behalf of the Subdivider and that the signators hereto have sufficient knowledge or expertise, either personally, through reasonable inspection and investigation of the property, or through reasonable reliance upon the investigation and professional opinion of Subdivider’s environmental experts, to make the representations herein, and that no consent of any other party is 92 01225.0006/366470.2 C-2
required to execute this warranty and make the representations herein on behalf of the Subdivider to the City of Chino.
Each of the undersigned persons declares under penalty of perjury that the foregoing is true and correct.
Dated: _________________________
LENNAR HOMES OF CALIFORNIA, LLC*
By:
*Proof of authorization for Subdivider’s signatures is required to be submitted concurrently with this environmental warranty.
93 MEMORANDUM
CITY OF CHINO
PUBLIC WORKS DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: LINDA REICH, CITY MANAGER
FROM: HYE JIN LEE, PUBLIC WORKS DIRECTOR
SUBJECT
..titl e
Replacement Subdivision Improvement Agreement for Tract Map No. 16420-6 (Block 11 - Lot 9) - Richmond American Homes of Maryland, Inc.
..end
RECOMMENDATION
Approve replacement Subdivision Improvement Agreement and securities with Richmond American Homes of Maryland, Inc. for Tract Map No. 16420-6 (Block 11 – Lot 9); and authorize the City Manager to execute any necessary documents on behalf of the City. ..body
FISCAL IMPACT
There is no direct fiscal impact to the City.
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above will further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
Responsible Long-Range Planning
Public Service Excellence Through Internal & External Partnerships 94 CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: REPLACEMENT SUBDIVISION IMPROVEMENT AGREEMENT FOR TRACT MAP NO. 16420-6 (BLOCK 11 - LOT 9) - RICHMOND AMERICAN HOMES OF MARYLAND, INC.
PAGE: 2
BACKGROUND
In 2008, the City’s Planning Commission approved an “A” level Master Site Approval and Tentative Tract Map No. 16420 to subdivide 522 acres of land generally located south of Pine Avenue, west of Hellman Avenue, and north and east of Chino Corona Road for what is known as the South of Pine area in The Preserve. An "A" level master site development plan is a preliminary, conceptual plan for a large-scale land development project. The purpose of the original Master Site Approval was to establish large parcels, and phase major backbone street systems for both future residential and non-residential development within the master plan area.
On February 23, 2022, the City’s Planning Commission conditionally approved a Development Modification to the Master Site Approval and Tentative Tract Map No. 16420. The modification removed the phased development concept originally approved, divided the larger land area into smaller lots to be reconveyed for development, and established improvement areas for future development. It is important to note that the Developer modification also incorporated conditions of approval for improvements along Pine Avenue for associated developments within the larger project area to help facilitate needed improvements to the area.
Subsequently, on September 19, 2022, the City’s Planning Commission approved a 32.63-acre Master Site Approval PL21-0056 and Tentative Tract Map No. 20445 for the future development of 305 single-family homes within four neighborhoods, a pocket park, and private recreation center located in the MDR (Medium Density Residential) and CC16 (Community Core 16) land use designations known as “Block 11.” This project is generally located south of Legacy Park Street, east of Main Street, and north of East Preserve Loop.
The developer, Chino Preserve Development Corporation, a Lewis Management Corporation company (“Lewis”), received City Council approval of Final Map No. 16420-6 on April 1, 2025, to subdivide the previously approved Tentative Tract Map No. 16420, as shown in Exhibit A. Lewis is actively developing the site and has entered into purchase agreements with four guest builders.
The Engineering Conditions of Approval (COA) for Block 11 requires public improvements including, but not limited to curb, gutter, sidewalk, streetlights, asphalt concrete pavement, median/parkway landscape, sewer, water, recycled water and drainage improvements. To guarantee the completion of these public improvements, Lewis entered into a Subdivision Improvement Agreement (SIA) with the City and obtained the necessary securities for the improvements which were approved with the Final Map on April 1, 2025.
ISSUES/ANALYSIS
Now that the final escrows for the guest builders have closed, City staff is coordinating with each builder to execute replacement SIAs to transfer and secure their respective obligations.
Richmond American Homes of Maryland, Inc. has acquired Lot 9, as shown in Exhibit A of the attached replacement SIA. The conditions established at the time of tentative map approval have been met through execution of the replacement agreement for Tract Map No. 16420-6 and the posting of securities guaranteeing construction of the public improvements required for Block 11. The City Attorney has reviewed and approved the replacement SIA and associated securities. Additionally, Lewis has executed a Partial Assignment and Assumption Agreement to the Development Agreement with Richmond American Homes of Maryland, Inc.
Attachments:
Exhibit A - Location Map Tract Map No. 16420-6
95 CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: REPLACEMENT SUBDIVISION IMPROVEMENT AGREEMENT FOR TRACT MAP NO. 16420-6 (BLOCK 11 - LOT 9) - RICHMOND AMERICAN HOMES OF MARYLAND, INC.
PAGE: 3
Exhibit B – Replacement Subdivision Improvement Agreement 96 97
01225.0006/366470.2 Updated 10-2020
SUBDIVISION IMPROVEMENT AGREEMENT
by and between
CITY OF CHINO
and
RICHMOND AMERICAN HOMES OF MARYLAND, INC.
98 01225.0006/366470.2
SUBDIVISION IMPROVEMENT AGREEMENT BETWEEN
THE CITY OF CHINO
AND
RICHMOND AMERICAN HOMES OF MARYLAND, INC.
Agreement Date: December 2, 2025
Subdivider Name: Richmond American Homes of Maryland, Inc.
Tentative Map No.: 16420-6 Lot 9
Estimated Total Cost of Improvements: $521,651.81
Estimated Total Cost of Monumentation: $0 (based upon the plans, including individual lots, subdivision boundary and public improvements).
Security:
Lot 9 In-Tract Street $285,209.40
Lot 9 In- Tract Wet Utilities $236,442.41
99 01225.0006/366470.2
Designees for the Service of Written Notice:
CITY: SUBDIVIDER:
Jesus Plasencia
Assistant City Engineer
13220 Central Avenue
Chino, CA 91710
(909) 334-3417
[email protected]
Richmond American Homes of Maryland, Inc.
c/o Monica Ultreras
Richard American Homes
2405 York Road, Suite 201
Lutherville Timonium, MD
Office: (949) 274-0746
[email protected]
CITY PROJECT INSPECTOR
Isaac Ortega
Permit & Inspection Supervisor
13220 Central Avenue
Chino, CA 91710
(909) 334-3501
[email protected]
100
01225.0006/366470.2
TABLE OF CONTENTS
1.Construction Obligations
1.1 Works of Improvement
1.2 Other Obligations Referenced in Conditions of Tentative Map Approval
1.3 Intent of Plans
1.4 Survey Monuments
1.5 Performance of Work
1.6 Changes in the Work
1.7 Defective Work
1.8 No Warranty by City
1.9 Authority of the City Engineer
1.10 Documents Available at the Site
1.11 Inspection
1.12 Compliance with Law; Applicable Standards for Improvements
1.13 Suspension of Work
1.14 Erosion and Dust Control and Environmental Mitigation
1.15 Final Acceptance of Works of Improvement
1.16 Vesting of Ownership
1.17 Subdivider’s Obligation to Warn Public During Construction
1.18 Injury to Public Improvements, Public Property or Public Utility
2. Time for Performance
2.1 Commencement and Completion Dates
2.2 Phasing Requirements
2.3 Force Majeure
2.4 Continuous Work
2.5 Reversion to Acreage
3. Labor
3.1 Labor Standards
3.2 Nondiscrimination
3.3 Licensed Contractors
3.4 Workers’ Compensation
4. Security
4.1 Required Security
4.2 Form of Security Instruments
4.3 Subdivider’s Liability
4.4 Letters of Credit
4.5 Release of Security Instruments
5. Cost of Construction and Provision of Inspection Service
5.1 Subdivider Responsible for All Related Costs of Construction 101
01225.0006/366470.2
5.2 Payment to City for Cost of Related Inspection and Engineering Services
5.3 Payment of Development Impact Fees
6. Acceptance of Offers of Dedication
7. Warranty of Work
8. Default
8.1 Default by Subdivider
8.2 Remedies
8.3 Remedies Not Exclusive
8.4 Attorney’s Fees and Costs
8.5 Waiver
9. Indemnity/Hold Harmless
10. Subdivider’s Indemnity of Project Approval
11. Insurance Requirements
12. Environmental Warranty
13. General Provisions
13.1 Successors and Assigns
13.2 No Third-Party Beneficiaries
13.3 No Vesting Rights
13.4 Subdivider is Not Agent of City
13.5 Time of the Essence
13.6 Notices
13.7 No Apportionment
13.8 Severability
13.9 Captions
13.10 Incorporation of Recitals
13.11 Interpretation
13.12 Entire Agreement; Waivers and Amendments
13.13 Counterparts
14.Authority
102
01225.0006/366470.2
1 SUBDIVISION IMPROVEMENT AGREEMENT
THIS SUBDIVISION IMPROVEMENT AGREEMENT (this “Agreement”) is entered into this 2nd day of December, 2025, by and between the CITY OF CHINO, a municipal corporation, organized and existing in the County of San Bernardino, under and by virtue of the laws of the State of California, (“CITY”), and Richmond American Homes of Maryland, Inc., (“SUBDIVDER”).
RECITALS
A. Subdivider is the owner of, and has obtained approval of a subdivision map identified as Tentative (Tract/Parcel) Map No. 16420-6 (Lot 9), (the “Map”), located in the City of Chino, County of San Bernardino, State of California (the “Property”), as described on Exhibit “A”. The Map requires Subdivider to comply with certain conditions of approval for the development of the Property (the “Conditions”) as described on Exhibit “B”.
B. Pursuant to the Conditions, Subdivider, by the Map, has offered for dedication to City for public use of the streets and easements shown on the Map. City desires to accept the streets and easements shown on the Map for public use, and certain other improvements described in this Agreement.
C. Subdivider has delivered to City, and City has approved, plans and specifications and related documents for certain “Works of Improvement” (as hereinafter defined) which are required to be constructed and installed in order to accommodate the development of the Property.
D. Subdivider’s agreement to construct and install the Works of Improvement pursuant to this Agreement and its offer of dedication of the streets, easements and other improvements and facilities, as shown on the Map, are a material consideration to City in approving Final Map No. 16420-6 (Lot 9) for the Property and permitting development of the Property to proceed.
COVENANTS
Based upon the foregoing Recitals which are incorporated herein by reference and in consideration of City’s approving the Map for the Property and permitting development of the Property to proceed, Subdivider agrees to timely perform all of its obligations as set forth herein.
1. Construction Obligations.
1.1. Works of Improvement. Subdivider agrees, at its sole cost and expense, to construct or install, or cause to be constructed or installed the street, drainage, domestic water, sanitary sewer, street lighting, landscaping, utility, and other improvements more fully described in Exhibit “B” attached hereto (the “Works of Improvement”), as the same may be supplemented and revised from time to time as set forth in this Agreement (said plans and 103
01225.0006/366470.2
2 specifications, together with all related documents, the “Plans”). The estimated construction cost for the Works of Improvement is $521,651.81.
1.2. Other Obligations Referenced in Conditions of Tentative Map Approval. In addition to the foregoing, Subdivider shall satisfy all of the Conditions on the Map for the Property. The Conditions associated with the Map are included in Exhibit “B” attached hereto.
1.3. Intent of Plans. The intent of the Plans referenced in Section 1.1 is to prescribe a complete work of improvement which Subdivider shall perform or cause to be performed in a manner acceptable to the City Engineer, (or designee), and in full compliance with all codes and the terms of this Agreement. Subdivider shall complete a functional or operable improvement or facility, even though the Plans may not specifically call out all items of work required for Subdivider’s contractor to complete its tasks, incidental appurtenances, materials, and the like. If any omissions are made or information necessary to carry out the full intent and meaning of the Plans, Subdivider or its contractor shall immediately notify its design engineer who will seek approval of the City Engineer for furnishing of detailed instructions. In the event of any doubt or question arising regarding the true meaning of any of the Plans, reference shall be made to the City Engineer whose decision thereon shall be final.
Subdivider recognizes that the Plans consist of general drawings. All authorized alterations affecting the requirements and information given on the Plans shall be in writing and approved by the City Engineer. The Plans shall be supplemented by such working or shop drawings as are necessary to adequately control the work. Without the City Engineer’s prior written approval, no change shall be made by Subdivider or its contractor to any plan, specification, or working or shop drawing after it has been stamped as approved.
1.4. Survey Monuments. Before final approval of street improvements, Subdivider shall place survey monuments as shown on Final Map No. 16420-6 (Lot 9) in accordance with the provisions of the State Subdivision Map Act and the Subdivision Ordinance of the City of Chino. Subdivider shall provide security for such obligation as provided in Section 4.1(a)(iii) and, after setting the monuments, Subdivider shall furnish the City Engineer written notice of the setting of said monuments and written proof of having paid the engineer or surveyor for the setting of said monuments.
1.5. Performance of Work. Subdivider shall furnish or cause to be furnished all materials, labor, tools, equipment, utilities, transportation, and incidentals required to perform Subdivider’s obligations under this Agreement.
1.6. Changes in the Work. The City Engineer, without invalidating this Agreement and without notification to any of the sureties or financial institutions referenced in Paragraph 4, may order extra work or may make changes by altering or deleting any portion of the Works of Improvement as specified herein or as deemed necessary or desirable by the City Engineer as determined necessary to accomplish the purposes of this Agreement and to protect the public health, safety, or welfare. The City Engineer shall notify Subdivider or its contractor in writing (by Correction Notice) at the time a determination has been made to require changes in the work. No field changes performed or proposed by Subdivider or its contractor shall be binding on City unless approved in writing by the City Engineer. The City and Subdivider may mutually 104
01225.0006/366470.2
3 agree upon changes to the Works of Improvement, subject to the security requirements in Section 4.
1.7. Defective Work. Subdivider shall cause its contractor to repair, reconstruct, replace, or otherwise make acceptable any work found by the City Engineer to be defective.
1.8. No Warranty by City. The Plans for the Works of Improvement have been prepared by or on behalf of Subdivider or its consultants or contractors, and City makes no representation or warranty, express or implied, to Subdivider or to any other person regarding the adequacy of the Plans or related documents.
1.9. Authority of the City Engineer. In addition to the authority granted to the City Engineer elsewhere in this Agreement, the City Engineer shall have the authority to decide all questions which may arise as to the quality and acceptability of materials furnished and work performed, and all questions as to the satisfactory and acceptable fulfillment of the terms of this Agreement by Subdivider and its contractor.
1.10. Documents Available at the Site. Subdivider shall cause its contractor to keep a copy of all approved Plans at the job site and shall give access thereto to the City’s inspectors and engineers at all times.
1.11. Inspection. Subdivider shall have an authorized representative on the job site at all times during which work is being done who has full authority to act for Subdivider, or its design engineer, and Subdivider’s contractor(s) regarding the Works of Improvement.
Subdivider shall cause its contractor to furnish the City with every reasonable facility for ascertaining whether or not the Works of Improvement as performed are in accordance with the requirements and intent of this Agreement, including the Plans. If the City inspector requests it, the Subdivider’s contractor, at any time before acceptance of the Works of Improvement, shall remove or uncover such portions of the finished work as may be directed which have not previously been inspected. After examination, the Subdivider’s contractor shall restore said portions of the work to the standards required hereunder. Inspection or supervision by the City Engineer (or designee) shall not be considered as direct control of the individual workmen on the job site. City’s inspectors shall have the authority to stop any and all work not in accordance with the requirements contained or referenced in this Agreement.
The inspection of the work by City shall not relieve Subdivider or its contractor of any obligations to fulfill this Agreement as herein provided, and unsuitable materials or work may be rejected notwithstanding that such materials or work may have been previously overlooked or accepted.
1.12. Compliance with Law; Applicable Standards for Improvements. In addition to the express provisions of this Agreement and the Plans, Subdivider shall cause construction of the Works of Improvement to be completed in accordance with all other applicable federal, state, and local laws, ordinances, rules and regulations. In addition, without limiting the foregoing, the Subdivider shall, at its expense, obtain and comply with the conditions of all necessary permits and licenses for the construction of the Works of Improvement. The Subdivider shall also give all necessary notices and pay all fees and taxes as required by law. 105
01225.0006/366470.2
4 Subdivider shall construct the improvements in accordance with the City standards in effect at the time of the adoption of the Approved Tentative Map. City reserves the right to protect the public safety or welfare or comply with applicable Federal or State law or City zoning ordinances.
1.13. Suspension of Work. The City Engineer shall have authority to order suspension of the work for failure of the Subdivider’s contractor to comply with law pursuant to Section
1.12. In case of suspension of work for any cause whatsoever, Subdivider and its contractor shall be responsible for all materials and shall store them properly if necessary and shall provide suitable interim drainage and/or dust control measures, and erect temporary structures where necessary.
1.14. Erosion and Dust Control and Environmental Mitigation. All grading, landscaping, and construction activities shall be performed in a manner to control erosion and prevent flooding problems. The City Engineer shall have the authority to require erosion plans to prescribe reasonable controls on the method, manner, and time of grading, landscaping, and construction activities to prevent nuisances to surrounding properties. Plans shall include without limitation temporary drainage and erosion control requirements, dust control procedures, restrictions on truck and other construction traffic routes, noise abatement procedures, storage of materials and equipment, removal of garbage, trash, and refuse, securing the job site to prevent injury, and similar matters.
1.15. Final Acceptance of Works of Improvement. After Subdivider’s contractor has completed all of the Works of Improvement, Subdivider shall then request a final inspection of the work. If items are found by the City’s inspectors to be incomplete or not in compliance with this Agreement or any of the requirements contained or referenced herein, City will inform the Subdivider or its contractor of such items. After the Subdivider’s contractor has completed these items, the procedure shall then be the same as specified above for the Subdivider’s contractor’s initial request for final inspection. If items are found by City’s inspectors to be incomplete or not in compliance after two (2) “final” inspections, the City may require the Subdivider or its contractor, as a condition to performing further field inspections, to submit in writing a detailed statement of the work performed subsequent to the date of the previous inspection which was found to be incomplete or not in compliance at that time. Subdivider shall be responsible for payment to City Engineer of re-inspection fees in the amount necessary to cover the City’s costs for additional final inspections, as determined by the City Engineer.
No inspection or acceptance pertaining to specific parts of the Works of Improvement shall be construed as final acceptance of any part until the overall final acceptance by the City Engineer is made. The City Engineer shall make a certification of completion and acceptance on the Works of Improvement by recordation of a Notice of Acceptance on behalf of the City.
Final acceptance shall not constitute a waiver by the City Engineer of defective work subsequently discovered.
The date on which the Works of Improvement will be considered as complete shall be the date of the Notice of Acceptance.
106
01225.0006/366470.2
5 1.16. Vesting of Ownership. Upon recordation of the Notice of Acceptance, ownership of the Works of Improvement shall vest in the City.
1.17. Subdivider’s Obligation to Warn Public During Construction. Until recordation of the Notice of Acceptance, Subdivider shall give good and adequate warning to the public of any dangerous condition of the Works of Improvements and shall take reasonable actions to protect the public from such dangerous condition. Until recordation of the Notice of Acceptance, Subdivider shall provide forty-eight (48) hours’ advance written notice to all neighboring property owners and tenants affected by Subdivider’s operations or construction of the hours, dates and duration of any planned construction activities.
1.18. Injury to Public Improvements, Public Property or Public Utility. Until recordation of the Notice of Acceptance of the Works of Improvement, Subdivider assumes responsibility for the care and maintenance of, and any damage to, the Works of Improvements. Subdivider shall replace or repair all Works of Improvements, public property, public utility facilities, and surveying or subdivision monuments and benchmarks which are destroyed or damaged for any reason, regardless whether resulting from the acts of the Subdivider, prior to the recordation of the Notice of Acceptance. Subdivider shall bear the entire cost of such replacement or repairs regardless of what entity owns the underlying property. Any repair or replacement shall be to the satisfaction, and subject to the approval, of the City Engineer.
Neither the City, nor any officer or employee thereof, shall be liable or responsible for any accident, loss or damage, regardless of cause, occurring to the work or Works of Improvements prior to recordation of the Notice of Acceptance of the work or improvements.
2. Time for Performance.
2.1. Commencement and Completion Dates. Subject to Sections 2.2 and 2.3 below, Subdivider shall (i) commence with construction and installation of the Works of Improvement thirty (30) days following City’s approval of the Plans (“Commencement Date”); and (ii) complete or cause to be completed all of the Works of Improvement within two (2) years after the Commencement Date. In the event good cause exists as determined by the City Engineer, the time for commencement of construction or completion of the Works of Improvement hereunder may be extended by up to three (3) additional one-year periods. Extensions shall be executed in writing by the City Engineer. The City Engineer in his or her sole discretion determines whether or not the Subdivider has established good cause for an extension. As a condition of such extension, the City Engineer may require Subdivider to furnish new security guaranteeing performance of this Agreement, as extended, in an increased amount to compensate for any increase in construction costs as determined by the City Engineer. If Subdivider requests and is granted an extension of time for completion of the improvements, City may apply the standards in effect at the time of the extension.
2.2. Phasing Requirements. Notwithstanding the provisions of Section 2.1, the City reserves the right to control and regulate the phasing of completion of specific Works of Improvement as required to comply with applicable City ordinances, regulations, and rules relating to the timely provision of public services and facilities. In addition to whatever other remedies the City may have for Subdivider’s failure to satisfy such phasing requirements, as 107
01225.0006/366470.2
6 the same now exist or may be amended from time to time, Subdivider acknowledges City’s right to withhold the issuance of further building permits on the Property until such phasing requirements are satisfied. Prior to issuance of building permits, Subdivider shall provide satisfactory evidence that all applicable requirements that are a condition to issuance of building permits have been satisfied. Such requirements may include the payment of fees, construction of improvements, or both. Final inspections or issuance of Certificates of Occupancy may be withheld from the Subdivider by the City, if, upon a determination by the City Engineer, completion of specific Works of Improvements or other requirements associated with the development of the Property have not been completed to the City Engineer’s satisfaction.
2.3. Force Majeure. Notwithstanding the provisions of Section 2.1, Subdivider’s time for commencement and completion of the Works of Improvement shall be extended for the period of any enforced delay caused due to circumstances beyond the control and without the fault of Subdivider, including to the extent applicable adverse weather conditions, flood, earthquakes, strikes, lockouts, pandemics, acts or failures to act of a public agency (including City), required changes to the scope of work required by City, and similar causes; provided, however, that the period of any enforced delay hereunder shall not include any period longer than five (5) days prior to City’s receipt of a written notice from Subdivider or its contractor detailing the grounds for Subdivider’s claim to a right to extend its time for performance hereunder. The City Engineer shall evaluate all claims to Force Majeure and make a reasonable determination regarding the length of any extension of time for commencement and/or completion of the Works of Improvement and the City Engineer’s decision shall be final.
2.4. Continuous Work. After commencement of construction of the Works of Improvement (or separate portion thereof), Subdivider shall cause such work to be diligently pursued to completion and shall not abandon the work for a consecutive period or more than thirty (30) days, events of Force Majeure excepted.
2.5. Reversion to Acreage. In addition to whatever other rights City may have due to Subdivider’s failure to timely perform its obligations hereunder, Subdivider recognizes that City reserves the right to revert the Property to acreage subject to the limitations and requirements set forth in California Government Code Section 66499.11 through Section 66499.20.1.
3. Labor.
3.1. Labor Standards. This Agreement is subject to, and Subdivider agrees to comply with, all of the applicable provisions of the Labor Code including, but not limited to, the wage and hour, prevailing wage, worker compensation, and various other labor requirements in Division 2, Part 7, Chapter 1, including section 1720 to 1740, 1770 to 1780, 1810 to 1815, 1860 to 1861, which provisions are specifically incorporated herein by reference as set forth herein in their entirety. Subdivider shall expressly require compliance with the provisions of this Section in all agreements with contractors and subcontractors for the performance of the Works of Improvement.
3.2. Nondiscrimination. In accordance with the California Fair Employment and Housing Act (“FEHA”), California Government Code Section 12940 et seq., Subdivider agrees 108
01225.0006/366470.2
7 that Subdivider, its agents, employees, contractors, and subcontractor performing any of the Works of Improvement shall not discriminate, in any way, against any person on the basis of race, ethnicity, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status. Subdivider shall expressly require compliance with the provisions of this Section in all agreements with contractors and subcontractors for the performance of this Agreement.
3.3. Licensed Contractors. Subdivider shall cause all of the Works of Improvement to be constructed by contractors and subcontractors with valid California Contractors’ licenses for the type of work being performed. All of Subdivider’s contractors and subcontractors shall obtain a valid City of Chino business license prior to performing any work pursuant to this Agreement. Subdivider shall provide the City Engineer with a list of all of its contractors and subcontractors prior to initiating any work, and all valid Contractor’s licenses and business licenses issued thereto as a condition of constructing the Works of Improvements.
3.4. Worker’s Compensation. Subdivider shall cause every contractor and subcontractor performing any of the Works of Improvement to carry Workers’ Compensation Insurance as required by the Labor Code of the State of California and shall cause each such contractor and subcontractor to submit to City a Certificate of Insurance verifying such coverage prior to such contractor or subcontractor entering onto the job site.
4. Security.
4.1. Required Security.
(a) At the time Subdivider executes this Agreement, Subdivider shall furnish to City the following bonds, letters of credit, instruments of credit (assignment of deposit account) or other security acceptable to City in its sole and absolute discretion and satisfying the requirements of the applicable provisions of this Section 4 below (hereinafter “Security Instruments”):
(i) A Security Instrument securing Subdivider’s faithful performance of all of the Works of Improvement (“Faithful Performance Security Instrument”), in the amount of $521,651.81 equal to 100% of the estimated construction cost referenced in Section 1.1.
(ii) A Security Instrument guaranteeing the payment to contractors, subcontractors, and other persons furnishing labor, materials, and/or equipment (“Labor and Materials Security Instrument”) with respect to the Works of Improvement in an amount equal to $260,825.91 equal to 50% of the estimated construction cost referenced in Section 1.1.
(iii) A Security Instrument guaranteeing the payment of the cost of setting monuments as required in Section 1.4 in the amount of $0 equal to 100% of the cost thereof.
109
01225.0006/366470.2
8 This Agreement shall not be effective for any purpose until such Security Instruments are supplied to and approved by City in accordance herewith. (b) Required Security Instrument for Maintenance and Warranty. Prior to the City Council’s acceptance of the Works of Improvement and recordation of a Notice of Completion, Subdivider shall deliver a Security Instrument warranting the work accepted for a period of one (1) year following said acceptance (“Maintenance and Warranty Security Instrument”), in the amount of $1,561,980.00 equal to 10% of the estimated construction cost set forth in Section 1.1 or a suitable amount determined by the City Engineer.
4.2. Form of Security Instruments. All Security Instruments shall be in the amounts required under Section 4.1 (a) or 4.1(b), as applicable, shall meet the following minimum requirements and otherwise shall be in a form provided by City or otherwise approved by the City Attorney:
(a) Bonds. For Security Instruments provided in the form of bonds, any such bond must be issued and executed by an insurance company or bank authorized to transact surety business in the State of California. Any insurance company acting as surety shall have a minimum rating of A-IX, as rated by the current edition of Best’s Key Rating Guide published by A.M. Best’s Company, Oldwick, New Jersey, 08858. Any bank acting as surety shall have a minimum rating of AA, as rated by Moody’s or Standard & Poor’s.
(b) Letters of Credit. For Security Instruments which are letters of credit, any letter of credit shall be an original separate unconditional, irrevocable, negotiable and transferable commercial letter of credit issued by a financial institution with offices in the State of California acceptable to City. Any such letter of credit shall specifically permit City to draw on same by unilateral certification of the City Engineer of the City that Subdivider is in default under its payment or performance obligations hereunder or in the event Subdivider fails to deliver a replacement letter of credit not less than thirty (30) days prior to the date of expiration of any such letter of credit and shall further be subject to the provisions of Section 4.4.
(c) Instrument of Credit. For Security Instruments which are Instruments of Credit, any Instrument of Credit shall be an assignment of deposit account assigning as security to City all of Subdivider’s interest in funds on deposit in one or more bank accounts with financial institutions acceptable to City. (d) General Requirements for all Security Instruments.
(i) Payments under any Security Instruments shall be required to be made (and, with respect to bonds, litigation shall be required to be instituted and maintained) in the City of Chino, State of California (and the Security Instrument shall so provide).
110
01225.0006/366470.2
9 (ii) Each Security Instrument shall have a minimum term of one (1) year after the deadline for Subdivider’s completing the Works of Improvement, in accordance with Section 2.1 (other than Instruments of Credit, which shall have no defined term or expiration date).
(iii) Each Security Instrument shall provide that changes may be made in the Works of Improvement pursuant to the terms of this Agreement without notice to any issuer or surety and without affecting the obligations under such Security Instrument. (iv) If the Subdivider seeks to replace any security with another security, the replacement shall: (1) comply with all the requirements for security in this Agreement; (2) be provided by the Subdivider to the City Engineer; and (3) upon its written acceptance by the City Engineer, be deemed a part of this Agreement. Upon the City Engineer’s acceptance of a replacement security, the former security shall be released by the City.
4.3. Subdivider’s Liability. While no action of Subdivider shall be required in order for City to realize on its security under any Security Instrument, Subdivider agrees to cooperate with City to facilitate City’s realization under any Security Instrument, and to take no action to prevent City from such realization of any Security Instrument. Notwithstanding the giving of any Security Instrument or the subsequent expiration of any Security Instrument or any failure by any surety or financial institution to perform its obligations with respect thereto, Subdivider shall be personally liable for performance under this Agreement and for payment of the cost of the labor and materials for the improvements required to be constructed or installed hereby and shall, within ten (10) days after written demand therefor, deliver to City such substitute security as City shall require satisfying the requirements in this Section 4.
4.4. Letters of Credit.
(a) In the event a letter of credit is given pursuant to Section 4.2(b), City shall be entitled to draw on any such letter of credit if a replacement letter of credit (expiring in not less than one (1) year, unless City agrees to a lesser term in City’s sole and absolute discretion) is not delivered not less than thirty (30) days prior to the expiration of the original letter of credit, such substitute letter of credit being in the same amount and having the terms and conditions as the initial letter of credit delivered hereunder, issued by a financial institution acceptable to City as of the date of delivery of the replacement letter of credit. (b) In the event of draw by the City on a letter of credit, the City may elect, in its sole and absolute discretion, to apply any such funds drawn to the obligations secured by such letter of credit or to hold such funds in an account under the control of the City, with no interest accruing thereon for the benefit of the Subdivider. If the City elects to hold the funds in an account pursuant to the foregoing, City may thereafter at any time elect instead to apply such funds as 111
01225.0006/366470.2
10 provided in the foregoing. Subdivider agrees and hereby grants City a security interest in such account to the extent required for City to realize on its interests therein and agrees to execute and deliver to City any other documents requested by City in order to evidence the creation and perfection of City’s security interest in such account.
4.5. Release of Security Instruments. The City shall release all Security Instruments consistent with Government Code Sections 66499.7 and 66499.8, Section 19.09.010 of the Chino Municipal Code, and as follows:
(a) City shall release the Faithful Performance Security Instrument and Labor and Materials Security Instrument when all of the following have occurred:
(i) Subdivider has made written request for release and provided evidence of satisfaction of all other requirements in this Section 4.5; (ii) the Works of Improvement have been accepted;
(iii) Subdivider has delivered the Maintenance and Warranty Security Instrument; and
(iv) after passage of the time within which lien claims are required to be made pursuant to Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code of the State of California. If lien claims have been timely filed, City shall hold the Labor and Materials Security Instrument until such claims have been resolved, Subdivider has provided a statutory bond, or otherwise as required by applicable law.
(b) City shall release the Maintenance and Warranty Security Instrument upon Subdivider’s written request upon the expiration of the warranty period, and settlement of any claims filed during the warranty period. (c) The City may retain from any security released, an amount sufficient to cover costs and reasonable expenses and fees, including reasonable attorney’s fees.
5. Cost of Construction and Provision of Inspection Service.
5.1. Subdivider Responsible for All Costs of Construction. Subdivider shall be responsible for payment of all costs incurred for construction and installation of the Works of Improvement. In the event Subdivider is entitled to reimbursement from City for any of the Works of Improvement, such reimbursement shall be subject to a separate Reimbursement Agreement to be entered into between Subdivider and City prior to construction of the Works of Improvement.
5.2. Payment to City for Cost of Related Inspection and Engineering Services.
Subdivider shall compensate City for all of City’s costs reasonably incurred in having its 112
01225.0006/366470.2
11 authorized representative make the usual and customary inspections of the Works of Improvement. In addition, Subdivider shall compensate City for all design, plan check, evaluating any proposed or agreed-upon changes in the work. The procedures for deposit and payment of such fees shall be as established by the City. In no event shall Subdivider be entitled to additional inspections or a final inspection and acceptance of any of the Works of Improvement until all City fees and charges have been fully paid, including without limitation, charges for applicable penalties and additional required inspections.
5.3. Payment of Development Impact Fees. Subdivider shall pay Development Impact Fees pursuant to and in accordance with Chino Municipal Code Chapter 3.40 or 3.45, as applicable.
6. Acceptance of Offers of Dedication. The City Council shall pass as appropriate resolution or resolutions accepting all offers of dedication shown on the Map for the Property, with acceptance to become effective upon completion and acceptance by City of the Works of Improvement. Such resolution(s) shall authorize the City Clerk to execute the Certificate made a part of the Map regarding said acceptance of the offer of dedication.
7. Warranty of Work. Subdivider shall guarantee all Works of Improvement against defective materials and workmanship for a period of one (1) year from the date of final acceptance. If any of the Works of Improvement should fail or prove defective within said one (1) year period due to any reason other than improper maintenance, or if any settlement of fill or backfill occurs, or should any portion of the Works of Improvement fail to fulfill any requirements of the Plans, Subdivider, within fifteen (15) days after written notice of such defects, or within such shorter time as may reasonably be determined by the City in the event of emergency, shall commence to repair or replace the same together with any other work which may be damaged or displaced in so doing. Should Subdivider fail to remedy defective material and/or workmanship or make replacements or repairs within the period of time set forth above, City may make such repairs and replacements and the actual cost of the required labor and materials shall be chargeable to and payable by Subdivider. The warranty provided herein shall not be in lieu of, but shall be in addition to, any warranties or other obligations otherwise imposed by law.
8. Default.
8.1. Default by Subdivider. Default by Subdivider shall include, but not be limited to:
(a) Subdivider’s failure to timely commence construction of Works of Improvement under this Agreement;
(b) Subdivider’s failure to timely complete construction of the Works of Improvement;
(c) Subdivider’s failure to perform substantial construction work for a period for 20 consecutive calendar days after commencement of the work; 113
01225.0006/366470.2
12 (d) Subdivider’s insolvency, appointment of a receiver, or the filing of any petition in bankruptcy, either voluntary or involuntary, which Subdivider fails to discharge within 30 days;
(e) The commencement of a foreclosure action against the subdivision or a portion thereof, or any conveyance in lieu or in avoidance of foreclosure; or (f) Subdivider’s failure to perform any other obligation under this Agreement.
8.2. Remedies. The City reserves all remedies available to it at law or in equity for a default or breach of Subdivider’s obligations under this Agreement. The City shall have the right, subject to this Section, to draw upon or use the appropriate security to mitigate the City’s damages in the event of default by Subdivider. The City’s right to draw upon or use the security is in addition to any other remedy available to City. The parties acknowledge that the estimated costs and security amounts may not reflect the actual cost of construction of the improvements and, therefore, City’s damages for Subdivider’s default shall be measured by the cost of completing the required improvements. The City may use the sums provided by the securities for the completion of the Works of Improvement in accordance with the plans. In the event the Subdivider fails to cure any default under this Agreement within 20 days after the City mails a notice of such default to the Subdivider and the Subdivider’s surety, Subdivider authorizes the City to perform the obligation for which Subdivider is in default and agrees to pay the entire cost of such performance by the City. The City may take over the work and complete the Works of Improvement, by contract or by any other method City deems appropriate, at the expense of the Subdivider. In such event, City, without liability for doing so, may complete the Works of Improvement using any of Subdivider’s materials, appliances, plans and other property that are at the work site and that are necessary to complete the Works of Improvement.
8.3. Remedies Not Exclusive. In any case where this Agreement provides a specific remedy to City for a default by Subdivider hereunder, the Subdivider agrees that the choice of remedy or remedies for Subdivider’s breach shall be in the discretion of the City. Additionally, any remedy specifically provided in this Agreement shall be in addition to, and not exclusive of, City’s right to pursue any other administrative, legal, or equitable remedy to which it may by entitled.
8.4. Attorney’s Fees and Costs. In the event that Subdivider fails to perform any obligation under this Agreement, Subdivider agrees to pay all costs and expenses incurred by City in securing performance of such obligations, including costs of suit and reasonable attorney’s fees. In the event of any dispute arising out of Subdivider’s performance of its obligations under this Agreement or under any of the Security Instruments referenced herein, the prevailing party in such action, in addition to any other relief which may be granted, shall be entitled to recover its reasonable attorney’s fees and costs. Such attorney’s fees and cost shall include fees and costs on any appeal, and in addition a party entitled to attorney’s fees and costs shall be entitled to all other reasonable costs incurred in investigating such action, taking depositions and discovery, retaining expert witnesses, and all other necessary and related costs with respect to the litigation. All such fees and costs shall be deemed to have 114
01225.0006/366470.2
13 accrued on commencement of the action and shall be enforceable whether or not the action is prosecuted to judgment.
8.5. Waiver. No waiver by the City of any breach or default by the Subdivider shall be considered valid unless in writing, and no such waiver by the City shall be deemed a waiver of any subsequent breach or default by the Subdivider.
9. Indemnity/Hold Harmless. City or any officer, employee or agent thereof shall not be liable for any injury to persons or property occasioned by reason of the acts or omissions of Subdivider, its agents, employees, contractors and subcontractors in the performance of this Agreement. Subdivider further agrees to protect, defend, indemnify and hold harmless City, its officials, boards and commissions, and members thereof, agents, and employees from any and all claims, demands, causes of action, liability or loss of any sort, because of, or arising out of, acts or omissions of Subdivider, its agents, employees, contractors and subcontractors in the performance of this Agreement, except for such claims, demands, causes of action, liability or loss arising out of the sole active negligence of the City, its officials, boards, commissions, the members thereof, agents and employees, including all claims, demands, causes of action, liability or loss because of or arising out of, in whole or in part, the design or construction of the improvements. This indemnification and agreement to hold harmless shall extend to injuries to persons and damages or taking of property resulting from the design or construction of said Subdivision, and the public improvements as provided herein, and in addition, to adjacent property owners as a consequence of the diversion of waters from the design and construction of public drainage systems, streets and other improvements.
Recordation of the Notice of Acceptance by the City of the Works of Improvements shall not constitute an assumption by the City of any responsibility for any damage or taking covered by this Section. City shall not be responsible for the design or construction of the property to be dedicated or the improvements pursuant to the approved improvement plans or map, regardless of any negligent action or inaction taken by the City in approving the plans or map, unless the particular improvement design was specifically required by City over written objection by Subdivider submitted to the City Engineer before approval of the particular improvement design, which objection indicated that the particular improvement design was dangerous or defective and suggested an alternative safe and feasible design.
After recordation of the Notice of Acceptance, the Subdivider shall remain obligated to eliminate any latent defect in design or dangerous condition caused by the design or construction defect for a period of one (1) year; however, Subdivider shall not be responsible for routine maintenance. It is the intent of this section that Subdivider shall be responsible for all liability for design and construction of the improvements installed or work done pursuant to this Agreement and that City shall not be liable for any negligence, nonfeasance, misfeasance or malfeasance in approving or reviewing any work or construction. The improvement security shall not be required to cover the provisions of this Paragraph.
Subdivider shall reimburse the City for all costs and expenses, including but not limited to fees and charges of architects, engineers, attorneys, and other professionals, and court costs, incurred by City in enforcing this Section.
115
01225.0006/366470.2
14 10. Subdivider’s Indemnity of Project Approval. Subdivider shall defend, indemnify, and hold harmless the City and its agents, officers, and employees from any claim, action, or proceeding against the City or its agents, officers, or employees to attack, set aside, void, or annul, an approval of the City, advisory agency, appeal board, or legislative body concerning the Subdivision. The City shall promptly notify the Subdivider of any claim, action, or proceeding and cooperate fully in the defense of any such claim, action, or proceeding. In the event City fails to promptly notify the Subdivider of any claim, action, or proceeding, or if the City fails to cooperate in the defense, the Subdivider shall not thereafter be responsible to defend, indemnify, or hold harmless the City. Nothing in this Section prohibits the City from participating in the defense of any claim, action, or proceeding if City bears its own attorney’s fees and costs and defends the action in good faith. Subdivider shall not be required to pay or perform any settlement unless the settlement is approved by the Subdivider.
11. Insurance Requirements. Subdivider, at Subdivider’s sole cost and expense and for the full term of this Agreement and any extensions thereto, shall obtain and maintain all of the following minimum insurance requirements in a form approved by the City’s authorized designee for Risk Management prior to commencing any work:
(a) Commercial General Liability policy with a minimum $1 million combined single limit for bodily injury and property damage providing all of the following minimum coverage without deductibles:
(i) Premises operations; including X, C, and U coverage; (ii) Owners’ and contractors’ protection;
(iii) Blanket contractual;
(iv) Completed operations; and
(v) Products.
(b) Commercial Business Auto policy with a minimum $1 million combined single limit for bodily injury and property damage, providing all of the following minimum coverage without deductibles:
(i) Coverage shall apply to any and all leased, owned, hired, or nonowned vehicles used in pursuit of any of the activities associated with this Agreement; and
(ii) Any and all mobile equipment including cranes which are not covered under the above Commercial Business Auto policy shall have said coverage provided under the Commercial General Liability policy. (c) Workers Compensation and Employers’ Liability policy in accordance with the laws of the State of California and providing coverage for any and all employees of the Subdivider:
116
01225.0006/366470.2
15 (i) This policy shall provide coverage for Workers’ Compensation (Coverage A); and
(i) This policy shall provide coverage for $1,000,000 Employers’ Liability (Coverage B).
(ii) Pursuant to Labor Code section 1861, Subdivider by executing this Agreement certifies: “I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract.”
(iii) Prior to commencement of work, the Subdivider shall file with the City’s Risk Manager a Certificate of Insurance or certification of permission to self-insure workers’ compensation conforming to the requirements of the Labor Code.
(d) Endorsements. All of the following endorsements are required to be made a part of each of the above-required policies as stipulated below:
(i) “The City of Chino, its officers, employees and agents are hereby added as additional insureds.”
(ii) “This policy shall be considered primary insurance with respect to any other valid and collectible insurance the City may possess, including any self- insured retention the City may have and any other insurance the City does possess shall be considered excess insurance only.”
(iii) “This insurance shall act for each insured and additional insured as though a separate policy has been written for each. This, however, will not act to increase the limit of the insuring company.” (iv) “Thirty (30) days prior written notice of cancellation shall be given to the City of Chino in the event of cancellation and/or reduction in coverage, except that ten (10) days prior written notice shall apply in the event of cancellation for non-payment of premium.” Such notice shall be sent to the Risk Manager at the address indicated in Subsection f below.
(v) Subsection d(iv) hereinabove “Cancellation Notice” is the only endorsement required of the Workers’ Compensation and Employers’ Liability policy.
117
01225.0006/366470.2
16 (e) Admitted Insurers. All insurance companies providing insurance to the Subdivider under this Agreement shall be admitted to transact the business of insurance by the California Insurance Commissioner.
(f) Proof of Coverage. Copies of all required endorsements shall be attached to the Certificate of Insurance which shall be provided by the Subdivider’s insurance company as evidence of the coverage required herein and shall be mailed to:
City of Chino
Risk Management
13220 Central Avenue
Chino, CA 91710
12. Environmental Warranty.
12.1. Prior to the acceptance of any dedications or Works of Improvement by City, Subdivider shall provide City with a written warranty in a form substantially similar to Exhibit “C” attached hereto and incorporated herein by reference, that:
(a) Neither the property to be dedicated nor Subdivider are in violation of any environmental law, and neither the property to be dedicated nor the Subdivider are subject to any existing, pending or threatened investigation by any federal, state or local governmental authority under or in connection with the environmental laws relating to the property to be dedicated. (b) Neither Subdivider nor any other person with Subdivider’s permission to be upon the property to be dedicated shall use, generate, manufacture, produce, or release, on, under, or about the property to be dedicated, any Hazardous Substance except in compliance with all applicable environmental laws. For the purposes of this Agreement, the term “Hazardous Substances” shall mean any substance or material which is capable of posing a risk of injury to health, safety or property, including all those materials and substances designated as hazardous or toxic by any federal, state or local law, ordinance, rule, regulation or policy, including but not limited to, all of those materials and substances defined as “Toxic Materials” in Sections 66680 through 66685 of Title 22 of the California Code of Regulations, Division 4, Chapter 30, as the same shall be amended from time to time, or any other materials requiring remediation under federal, state or local laws, ordinances, rules, regulations or policies. (c) Subdivider has not caused or permitted the release of and has no knowledge of the release or presence of any Hazardous Substance on the property to be dedicated or the migration of any hazardous substance from or to any other property adjacent to, or in the vicinity of, the property to be dedicated. (d) Subdivider’s prior and present use of the property to be dedicated has not resulted in the release of any hazardous substance on the property to be dedicated.
118
01225.0006/366470.2
17 12.2. Subdivider shall give prompt written notice to City of:
(a) Any proceeding or investigation by any federal, state or local governmental (b) authority with respect to the presence of any hazardous substance on the property to be dedicated or the migration thereof from or to any other property adjacent to, or in the vicinity of, the property to be dedicated. (c) Any claims made or threatened by any third party against City or the property to be dedicated relating to any loss or injury resulting from any hazardous substance; and
(d) Subdivider’s discovery of any occurrence or condition on any property adjoining or in the vicinity of the property to be dedicated that could cause the property to be dedicated or any part thereof to be subject to any restrictions on its ownership, occupancy, use for the purpose for which it is intended, transferability or suit under any environmental law.
13. General Provisions.
13.1. Successors and Assigns. This Agreement shall be binding upon all successors and assigns to Subdivider’s right, title, and interest in and to the Property and any portion thereof. Subdivider hereby consents to City recording this Agreement as official records of San Bernardino County, affecting fee title interest to the Property to provide constructive notice of the rights and obligations incurred by Subdivider in the City’s approval of this Agreement. In the event the Property is subsequently conveyed by Subdivider to a third party prior to completion of the Works of Improvement, whereby the third party is intended to assume Subdivider’s responsibilities with regard to this Agreement, (the “Replacement Subdivider”), the rights and obligations of this Agreement shall transfer to the Replacement Subdivider; however, the Security Instruments required pursuant to Section 4 of this Agreement, and furnished by Subdivider as a condition of the City’s approval of this Agreement, shall remain Subdivider’s responsibility to maintain until such time as Subdivider and its Replacement Subdivider enter into a Transfer and Assignment of Subdivision Agreement, (the “Transfer Agreement”), to acknowledge the transfer of fee title to the Property from the Subdivider to its Replacement Subdivider, and to acknowledge the rights and obligations associated with this Agreement upon the Replacement Subdivider, including Replacement Subdivider’s responsibility to furnish replacement Security Instruments meeting the City’s approval pursuant to Section 4 of this Agreement. Until such time as a Transfer Agreement, meeting the City’s approval, is executed by Subdivider and its Replacement Subdivider, and replacement Security Instruments meeting City’s approval are furnished by the Replacement Subdivider, Subdivider retains sole responsibility for maintaining all Security Instruments required pursuant to Section 4 of this Agreement.
13.2. No Third-Party Beneficiaries. This Agreement is intended to benefit only the parties hereto and their respective successors and assigns. Neither City nor Subdivider intend to create any third-party beneficiary rights in this Agreement in any contractor, subcontractor, member of the general public, or other person or entity. 119
01225.0006/366470.2
18 13.3. No Vesting Rights. Performance by the Subdivider of this Agreement shall not be construed to vest Subdivider’s rights with respect to any change in any zoning or building law or ordinance.
13.4. Subdivider is Not Agent of City. Neither Subdivider nor Subdivider’s agents, contractors, or subcontractors are agents or contractors of the City in connection with the performance of Subdivider’s obligations under this Agreement.
13.5. Time of the Essence. Time is of the essence of Subdivider’s performance of all of its obligations under this Agreement.
13.6. Notices. Unless otherwise specified in this Agreement, all notices required or provided for under this Agreement shall be in writing and delivered in person or sent by mail, postage prepaid and addressed as provided in this Section. Notice shall be effective on the date is delivered in person, or, if mailed, on the date of deposit in the United States Mail.
Notice shall be provided to the persons listed on Pages 1 and 2 of this Agreement by the parties for this purpose.
Either party may provide a new designated representative and/or address by written notice as provided in this Section.
13.7. No Apportionment. Nothing contained in this Agreement shall preclude City from expending monies pursuant to agreements concurrently or previously executed between the parties, or from entering into agreements with other subdividers for the apportionment of costs of water and sewer mains, or other improvements pursuant to the provisions of the City ordinances providing, therefore. Nor shall anything in the Agreement commit City to any such apportionment.
13.8. Severability. If any portion of this Agreement is held invalid by a court of competent jurisdiction, the remainder of the Agreement shall remain in full force and effect unless amended or modified by mutual written consent of the parties.
13.9. Captions. The captions of this Agreement are for convenience and reference only and shall not be used in the interpretation of any provision of this Agreement.
13.10. Incorporation of Recitals. The recitals to this Agreement are hereby incorporated into the terms of this Agreement.
13.11. Interpretation. This Agreement shall be interpreted in accordance with the laws of the State of California.
13.12. Entire Agreement; Waivers and Amendments. This Agreement integrates all of the terms and conditions mentioned herein, or incidental hereto, and supersedes all negotiations and previous agreements between the parties with respect to all or part of the subject matter hereof, except as may be expressly provided herein. All waivers of the provisions of this Agreement must be in writing and signed by an authorized representative of the party to be charged, and all amendments hereto must be in writing and signed by the appropriate representatives of both parties.
120
01225.0006/366470.2
19 13.13. Counterparts. This Agreement may be executed in one or more counterparts, all of which taken together shall be deemed one original.
14. Authority. The persons executing this Agreement on behalf of the parties warrant the (I) party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into of this Agreement does not violate any provisions of any other agreement to which said party is bound. [SIGNATURES ON NEXT PAGE]
121
01225.0006/366470.2
20 IN WITNESS WHEREOF, the City and the Subdivider have caused this Agreement to be executed the day and year first above written.
APPROVED AS TO FORM: APPROVED AS TO CONTENT:
___________________________ _____________________________ Fred Galante, City Attorney Hye Jin Lee, P.E.
Director of Public Works
RICHMOND AMERICAN HOMES OF MARYLAND, INC.
By: __________________________
Its: Authorized Agent
Monica Ultreras
CITY OF CHINO
Dr. Linda Reich, City Manager
Date:
ATTEST:
By
Natalie Gonzaga, City Clerk
Dated: ___________________________
122
01225.0006/366470.2
123
01225.0006/366470.2 A-1
EXHIBIT “A”
[attached]
124
125
01225.0006/366470.2 B-1
EXHIBIT “B”
TENTATIVE TRACT MAP NO. 16420-6 (LOT 9) WORKS OF IMPROVEMENT A. Removal of undesirable, dangerous and dead plant materials and roots.
B. All onsite and offsite grading as specified on the approved grading plan.
C. Relocation of all public utility structures as necessary to properly construct the required improvements.
D. Storm drain facilities as required and shown on the approved construction plans and in accordance with City Standards.
E. Sanitary sewers constructed as shown on the approved, engineered plans and in accordance with City Standards.
F. Water mains, valves, hydrants, services, meters and appurtenances to serve each lot as shown on the approved construction plans and in accordance with City Standards.
G. Underground installation of all electrical, telephone, cable television and any other energy or communication lines that abut or are within the project site.
H. A street lighting system (City-owned) in accordance with City Standards.
I. Disposal of all rocks and debris located within any public right-of-way within said development or on the boundary streets thereof.
J. Installation of concrete curbs, gutters, sidewalks, cross gutters, driveways and intersections as shown on approved construction plans and in accordance with City Standards.
K. Installation of asphalt concrete or Portland Cement Concrete street pavement on base material as shown on approved construction plans and in accordance with City Standards.
L. Street signs at intersections per the City Standards.
M. Installation of approved landscaping (plants and materials).
N. Setting monuments as required by the State Code.
The Subdivider shall also perform all work and furnish all materials necessary, in the opinion of the Director of Development Services or his designee and on his order, to complete the improvements in accordance with the plans and specifications on file as hereinbefore specified, or any changes required or ordered by said Engineer which, in his opinion, are necessary or required to complete this work. 126
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
EA Tree Removal $ 800.00 $ -
17 CY Concrete Removal $ 325.00 $ 5,525.00
131 CY AC Pavement Removal $ 100.00 $ 13,100.00
CY Imported Common Fill (Incl. Compaction) $ 34.00 $ -
SF Preparation of Subgrade, Sidewalk and Paving $ 1.00 $ - 3513 LF PCC 8" Curb & 24" Gutter on 6" AB $ 26.00 $ 91,338.00 4182 LF PCC 6" Curb & 24" Gutter on 6" AB $ 24.00 $ 100,368.00 4391 LF PCC Curb Only $ 20.00 $ 87,820.00
LF 8" A.C. Berm $ 20.00 $ -
240 SF 8" PCC Cross Gutter on 6" AB $ 16.00 $ 3,840.00
66375 SF 4" PCC Sidewalk $ 5.80 $ 384,975.00
1021 SF 6" PCC Thick Pavement on 6" AB $ 12.50 $ 12,762.50 SF 8" PCC Thick Drive Approach on 6" AB $ 15.00 $ -
LF 2" x 6" Redwood Header $ 7.50 $ -
EA Street Sign and Post $ 475.00 $ -
EA Traffic Sign and Post $ 400.00 $ -
EA Reflector Sign and Post $ 175.00 $ -
EA Painted Legend $ 6.50 $ -
SF Prime or Tack Coat $ 0.08 $ -
TON AC Variable - <300T $ 130.00 $ -
TON 4,399 AC Variable - >300T $ 120.00 $ 527,880.00
TON CAB Variable - <300T $ 100.00 $ -
TON 5,005 CAB Variable - >300T $ 90.00 $ 450,450.00
EngCostEstimate Page 1 of 10 Effective Date: January 1, 2021 127
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
24 EA Adjust Sewer Manhole to Grade $ 950.00 $ 22,800.00 EA Adjust Sewer Cleanout to Grade $ 500.00 $ -
42 EA Adjust Water Valve and Can to Grade $ 525.00 $ 22,050.00 26 EA Street Light $ 7,700.00 $ 200,200.00
1 EA Electrical Pedestal $ 6,500.00 $ 6,500.00
EA Lot Monument Setting Fee $ 550.00 $ -
LF Sawcut A.C. $ 3.00 $ -
LF Sawcut Concrete $ 3.00 $ -
SF Cold Plane A.C. 2" Thick $ 0.28 $ -
Signing & Striping for
LF Arterial $ 19.00 $ -
3225 LF Collector $ 13.00 $ 41,925.00
LF Local $ 7.00 $ -
EA Traffic Signal (8 - Phase Controller) $ 350,000.00 $ - EA Modify existing Traffic Signal per Quadrant $ 75,000.00 $ - LF Chain Link Fence
4 foot Residential Grade (Add $7.00/LF for Removal
of Existing Fence) $ - 25.00 $
6 foot School fence (Add $9.00/LF for Removal of
Existing Fence) $ - 35.00 $
EA Utility Poles
Transmission $ 11,500.00 $ -
Distribution $ 8,000.00 $ -
Service $ 3,000.00 $ -
EngCostEstimate Page 2 of 10 Effective Date: January 1, 2021 128
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
SF
Landscape (Including shrubs, Hardscape, Irrigation,
Ground Cover, Lighting, Installation Labor and Connection to Existing Systems) $ - 15.00 $
LF
14 foot Median with Landscape, Irrigation, Lighting,
Hardscape, Curb, Gutter & Pavement $ - 300.00 $
Rail Road Crossing
LS
Safety Equipment (Complete Including Crossing
Gates, Signs, and Lights) $ - 500,000.00 $
SF Track Crossing (Concrete) $ 175.00 $ -
SF Approach $ 4.00 $ -
36 EA S.W. Ramps (A.D.A. Compliant) $ 4,000.00 $ 144,000.00 EA Traffic Signal Loops $ 600.00 $ -
SF 691 4" to 6" Fresno River Cobble Pavement $ 10.00 $ 6,910.00 LF 148 Metal Beam Guard Rail $ 70.00 $ 10,360.00
STREETS
STREET SUBTOTAL 2,132,803.50 $
LS Mobilzation (5% of Construction Cost) 5% 106,640.18 $ LS Traffic Control (5% of Construction Cost) 5% $ 106,640.18 LS Clear & Grub Site (5% of Construction Cost) 5% $ 106,640.18 LS Excavation (Clean Material) (5% of Construction Cost) 5% 106,640.18 $ GRAND TOTAL STREETS ONLY $ 2,559,364.20
EngCostEstimate Page 3 of 10 Effective Date: January 1, 2021 129
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
WATER
LF Trench Support/Shoring (6 foot depth) $ 15.00 $ -
CY Pipe Bedding & Compaction (Imported) $ 90.00 $ -
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ - 80.00 $
275 LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ 27,500.00 100.00 $ 3101 LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ 418,635.00 135.00 $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 175.00 $ LF Removal, Disposal of ACP and Backfill $ 150.00 $ -
EA 6" Gate Valve $ 2,000.00 $ -
5 EA 8" Gate Valve $ 2,600.00 $ 13,000.00
11 EA 12" Gate Valve $ 4,500.00 $ 49,500.00
EA 18" Gate Valve $ 7,500.00 $ -
6 EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ 45,000.00 7 EA Blow-off Assembly 4" per City Std. $ 8,600.00 $ 60,200.00 EA 2" Air Relief Assembly $ 4,500.00 $ -
EA 1" Water Service/Meter $ 3,500.00 $ -
EA 2" Water Service/Meter $ 4,500.00 $ -
WATER
WATER SUBTOTAL $ 613,835.00
LS Mobilzation (5% of Construction Cost) 5% $ 30,691.75 LS Traffic Control (5% of Construction Cost) 5% 30,691.75 $ GRAND TOTAL WATER ONLY $ 675,218.50
EngCostEstimate Page 4 of 10 Effective Date: January 1, 2021 130
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
RECYCLED WATER
LF Trench Support/Shoring (6 foot depth) $ 15.00 $ -
CY Pipe Bedding (Imported) $ 90.00 $ -
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ - 80.00 $
3182 LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ 318,200.00 100.00 $ LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 135.00 $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 175.00 $ EA 6" Gate Valve $ 2,000.00 $ -
10 EA 8" Gate Valve $ 2,600.00 $ 26,000.00
EA 12" Gate Valve $ 4,500.00 $ -
EA 18" Gate Valve $ 7,500.00 $ -
EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ -
4 EA Blow-off Assembly 5" per City Std. $ 8,600.00 $ 34,400.00 1 EA 2" Air Relief Assembly $ 4,500.00 $ 4,500.00
EA 1" Water Service/Meter $ 3,500.00 $ -
EA 2" Water Service/Meter $ 4,500.00 $ -
RECYCLED WATER
RECYCLED WATER SUBTOTAL $ 383,100.00
LS Mobilzation (5% of Construction Cost) 5% $ 19,155.00 LS Traffic Control (5% of Construction Cost) 5% 19,155.00 $ GRAND TOTAL RECYCLED WATER ONLY $ 421,410.00
EngCostEstimate Page 5 of 10 Effective Date: January 1, 2021 131
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
SEWER
LF Trench Support/Shoring $ 15.00 $ -
LF
4" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $75.00 - $
LF
8" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $93.00 - $
LF
10" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $103.00 - $
LF
12" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $123.00 - $
LF
15" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $143.00 - $
LF
18" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $163.00 - $
LF
21" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $193.00 - $
LF
24" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $208.00 - $
EA Sewer Saddle $450.00 $ -
EA Wyes 4" x 8" Typical $225.00 $ -
EA 48" Sewer Manhole $4,700.00 $ -
EA 60" Sewer Manhole $7,500.00 $ -
EA Sewer Cleanout $1,800.00 $ -
SEWER
SEWER SUBTOTAL $ -
LS Mobilization (5% of Construction Cost) 5% $ -
LS Traffic Control (5% of Construction Cost) 5% - $
GRAND TOTAL SEWER ONLY $ -
EngCostEstimate Page 6 of 10 Effective Date: January 1, 2021 132
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STORM DRAIN
LF 24" X 36" C.M.P.A. (10 Gauge) $ 230.00 $ -
LF 27" x 43" C.M.P.A (10 Gauge) $ 250.00 $ -
17 EA Storm Drain Manhole #1 $ 10,000.00 $ 170,000.00
EA Junction Structure #2 (24" or larger) $ 8,850.00 $ - 4 EA Junction Structure #4 (24" or smaller) $ 4,000.00 $ 16,000.00 EA Outlet Structure $ 7,000.00 $ -
22 EA Catch Basin 3.5' Width $ 7,200.00 $ 158,400.00
EA Catch Basin 7' Width/L.D. $ 7,900.00 $ -
EA Catch Basin 10' Width/L.D. $ 9,950.00 $ -
EA Catch Basin 14' Width/L.D. $ 11,000.00 $ -
EA Catch Basin 21' Width/L.D. $ 13,000.00 $ -
LF
18 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 200.00 $
2002 LF
24 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ 480,480.00 240.00 $ LF
27 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 260.00 $
LF
30 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 280.00 $
LF
33 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 295.00 $
LF
36 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 310.00 $
LF
39 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 320.00 $
1589 LF
42 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ 524,370.00 330.00 $ LF
45 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 360.00 $
169 LF
48 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ 65,065.00 385.00 $
LF
54 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 440.00 $
LF
60 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 500.00 $
EngCostEstimate Page 7 of 10 Effective Date: January 1, 2021 133
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STORM DRAIN
LF
66 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 560.00 $
LF
72 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 625.00 $
LF
78 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 690.00 $
LF
84 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 765.00 $
LF
90 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 830.00 $
LF
96 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 920.00 $
LF
102 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
LF
108 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,075.00 $
LF
7' x 6' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 700.00 $
LF
7' x 8.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ - 820.00 $
LF
7' x 9.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ - 870.00 $
LF
8' x 11' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
LF
8' x 13' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,100.00 $
LF
9' x 9' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
2 EA 24" CMP Riser $ 1,250.00 $ 2,500.00
77 LF 24" CSP Pipe $ 200.00 $ 15,400.00
3 EA PIPE END CAPS $ 200.00 $ 600.00
42 LF 8" HDPE N12 DRAIN PIPE $ 50.00 $ 2,100.00
STORM DRAIN
STORM DRAIN SUBTOTAL $ 1,434,915.00
LS Mobilization (5% of Construction Cost) 5% 71,745.75 $ LS Traffic Control (5% of Construction Cost) 5% 71,745.75 $ GRAND TOTAL STORM DRAIN ONLY $ 1,578,406.50
EngCostEstimate Page 8 of 10 Effective Date: January 1, 2021 134
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
DIRECT COSTS GRAND TOTAL STREETS ONLY 2,559,364.20 $
GRAND TOTAL WATER ONLY $ 675,218.50
GRAND TOTAL RECYCLED WATER ONLY $ 421,410.00
GRAND TOTAL SEWER ONLY $ -
GRAND TOTAL STORM DRAIN ONLY $ 1,578,406.50
GRAND TOTAL (FOR PLAN CHECK & INSPECTION FEE
DETERMINATION) $ 5,234,399.20
PROJECT ADDITIVES Project Contingencies 10% $ 523,439.92 Construction Staking 3% $ 157,031.98
Soils Testing 1% $ 52,343.99
Material Testing 1% $ 52,343.99
Construction Inspection 4.8% $ 251,251.16
Contract Administration 1% $ 52,343.99
GRAND TOTAL (FOR BOND AMOUNTS) $ 6,323,154.23
Faithful Performance Bond (100% of Construction Cost)
Labor & Material Bond (50% of Construction Cost)
Warranty Bond (10% of Construction Cost)
EngCostEstimate Page 9 of 10 Effective Date: January 1, 2021 135
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
C. Berard
45183
BY ENGINEER
Prepared By:
R.C.E. Number:
Expiration:
Place R.C.E. Stamp and Signature Here (required)
BY CITY
$ 6,323,200.00
$ 3,161,600.00
$ 632,300.00
Faithful Performance Bond (100% of Construction Cost)
Labor & Material Bond (50% of Construction Cost)
Warranty Bond (10% of Construction Cost)
EngCostEstimate Page 10 of 10 Effective Date: January 1, 2021 136
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
EA Tree Removal $ 800.00 $ -
CY Concrete Removal $ 325.00 $ -
CY AC Pavement Removal $ 100.00 $ -
CY Imported Common Fill (Incl. Compaction) $ 34.00 $ -
SF Preparation of Subgrade, Sidewalk and Paving $ 1.00 $ - LF PCC 8" Curb & 24" Gutter on 6" AB $ 26.00 $ -
LF PCC 6" Curb & 24" Gutter on 6" AB $ 24.00 $ -
LF PCC Curb Only $ 20.00 $ -
LF 8" A.C. Berm $ 20.00 $ -
SF 8" PCC Cross Gutter on 6" AB $ 16.00 $ -
66375 SF 4" PCC Sidewalk $ 5.80 $ 384,975.00
SF 6" PCC Thick Pavement on 6" AB $ 12.50 $ -
SF 8" PCC Thick Drive Approach on 6" AB $ 15.00 $ -
LF 2" x 6" Redwood Header $ 7.50 $ -
EA Street Sign and Post $ 475.00 $ -
EA Traffic Sign and Post $ 400.00 $ -
EA Reflector Sign and Post $ 175.00 $ -
EA Painted Legend $ 6.50 $ -
SF Prime or Tack Coat $ 0.08 $ -
TON AC Variable - <300T $ 130.00 $ -
TON AC Variable - >300T $ 120.00 $ -
TON CAB Variable - <300T $ 100.00 $ -
TON CAB Variable - >300T $ 90.00 $ -
EngCostEstimate Page 1 of 10 Effective Date: January 1, 2021 137
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
24 EA Adjust Sewer Manhole to Grade $ 950.00 $ 22,800.00 EA Adjust Sewer Cleanout to Grade $ 500.00 $ -
42 EA Adjust Water Valve and Can to Grade $ 525.00 $ 22,050.00 26 EA Street Light (Install only. SLs are purchased) $ 3,000.00 $ 78,000.00 EA Electrical Pedestal $ 6,500.00 $ -
EA Lot Monument Setting Fee $ 550.00 $ -
LF Sawcut A.C. $ 3.00 $ -
LF Sawcut Concrete $ 3.00 $ -
SF Cold Plane A.C. 2" Thick $ 0.28 $ -
Signing & Striping for
LF Arterial $ 19.00 $ -
3225 LF Collector $ 13.00 $ 41,925.00
LF Local $ 7.00 $ -
EA Traffic Signal (8 - Phase Controller) $ 350,000.00 $ - EA Modify existing Traffic Signal per Quadrant $ 75,000.00 $ - LF Chain Link Fence
4 foot Residential Grade (Add $7.00/LF for Removal
of Existing Fence) $ - 25.00 $
6 foot School fence (Add $9.00/LF for Removal of
Existing Fence) $ - 35.00 $
EA Utility Poles
Transmission $ 11,500.00 $ -
Distribution $ 8,000.00 $ -
Service $ 3,000.00 $ -
EngCostEstimate Page 2 of 10 Effective Date: January 1, 2021 138
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STREETS
SF
Landscape (Including shrubs, Hardscape, Irrigation,
Ground Cover, Lighting, Installation Labor and Connection to Existing Systems) $ - 15.00 $
LF
14 foot Median with Landscape, Irrigation, Lighting,
Hardscape, Curb, Gutter & Pavement $ - 300.00 $
Rail Road Crossing
LS
Safety Equipment (Complete Including Crossing
Gates, Signs, and Lights) $ - 500,000.00 $
SF Track Crossing (Concrete) $ 175.00 $ -
SF Approach $ 4.00 $ -
36 EA S.W. Ramps (A.D.A. Compliant) $ 4,000.00 $ 144,000.00 EA Traffic Signal Loops $ 600.00 $ -
SF 691 4" to 6" Fresno River Cobble Pavement $ 10.00 $ 6,910.00 LF 148 Metal Beam Guard Rail $ 70.00 $ 10,360.00
1 EA Final Punchlist Work $ 25,000.00 $ 5,000.00
STREETS
STREET SUBTOTAL 716,020.00 $
LS Mobilzation (5% of Construction Cost) 5% - $
LS Traffic Control (5% of Construction Cost) 5% $ -
LS Clear & Grub Site (5% of Construction Cost) 5% $ -
LS Excavation (Clean Material) (5% of Construction Cost) 5% - $ GRAND TOTAL STREETS ONLY $ 716,020.00
EngCostEstimate Page 3 of 10 Effective Date: January 1, 2021 139
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
WATER
LF Trench Support/Shoring (6 foot depth) $ 15.00 $ -
CY Pipe Bedding & Compaction (Imported) $ 90.00 $ -
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ - 80.00 $
LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ - 100.00 $
LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 135.00 $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 175.00 $ LF Removal, Disposal of ACP and Backfill $ 150.00 $ -
EA 6" Gate Valve $ 2,000.00 $ -
EA 8" Gate Valve $ 2,600.00 $ -
EA 12" Gate Valve $ 4,500.00 $ -
EA 18" Gate Valve $ 7,500.00 $ -
EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ -
EA Blow-off Assembly 4" per City Std. $ 8,600.00 $ -
EA 2" Air Relief Assembly $ 4,500.00 $ -
EA 1" Water Service/Meter $ 3,500.00 $ -
EA 2" Water Service/Meter $ 4,500.00 $ -
1 EA Final Punchlist Work $ 25,000.00 $ 25,000.00
WATER
WATER SUBTOTAL $ 25,000.00
LS Mobilzation (5% of Construction Cost) 0% $ -
LS Traffic Control (5% of Construction Cost) 0% - $
GRAND TOTAL WATER ONLY $ 25,000.00
EngCostEstimate Page 4 of 10 Effective Date: January 1, 2021 140
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
RECYCLED WATER
LF Trench Support/Shoring (6 foot depth) $ 15.00 $ -
CY Pipe Bedding (Imported) $ 90.00 $ -
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration $ - 80.00 $
LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. $ - 100.00 $
LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 135.00 $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration $ - 175.00 $ EA 6" Gate Valve $ 2,000.00 $ -
EA 8" Gate Valve $ 2,600.00 $ -
EA 12" Gate Valve $ 4,500.00 $ -
EA 18" Gate Valve $ 7,500.00 $ -
EA Fire Hydrant Assembly per City Std. $ 7,500.00 $ -
EA Blow-off Assembly 5" per City Std. $ 8,600.00 $ -
EA 2" Air Relief Assembly $ 4,500.00 $ -
EA 1" Water Service/Meter $ 3,500.00 $ -
EA 2" Water Service/Meter $ 4,500.00 $ -
1 EA Final Punchlist Work $ 25,000.00 $ 25,000.00
RECYCLED WATER
RECYCLED WATER SUBTOTAL $ 25,000.00
LS Mobilzation (5% of Construction Cost) 0% $ -
LS Traffic Control (5% of Construction Cost) 0% - $
GRAND TOTAL RECYCLED WATER ONLY $ 25,000.00
EngCostEstimate Page 5 of 10 Effective Date: January 1, 2021 141
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
SEWER
LF Trench Support/Shoring $ 15.00 $ -
LF
4" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $75.00 - $
LF
8" V.C.P Installed, including excavation, bedding, backfill and pavement restoration $93.00 - $
LF
10" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $103.00 - $
LF
12" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $123.00 - $
LF
15" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $143.00 - $
LF
18" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $163.00 - $
LF
21" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $193.00 - $
LF
24" V.C.P. Installed, including excavation, bedding,
backfill and pavement restoration $208.00 - $
EA Sewer Saddle $450.00 $ -
EA Wyes 4" x 8" Typical $225.00 $ -
EA 48" Sewer Manhole $4,700.00 $ -
EA 60" Sewer Manhole $7,500.00 $ -
EA Sewer Cleanout $1,800.00 $ -
1 EA Final Punchlist Work $ 25,000.00 $ 25,000.00
SEWER
SEWER SUBTOTAL $ 25,000.00
LS Mobilization (5% of Construction Cost) 0% $ -
LS Traffic Control (5% of Construction Cost) 0% - $
GRAND TOTAL SEWER ONLY $ 25,000.00
EngCostEstimate Page 6 of 10 Effective Date: January 1, 2021 142
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STORM DRAIN
LF 24" X 36" C.M.P.A. (10 Gauge) $ 230.00 $ -
LF 27" x 43" C.M.P.A (10 Gauge) $ 250.00 $ -
EA Storm Drain Manhole #1 $ 10,000.00 $ -
EA Junction Structure #2 (24" or larger) $ 8,850.00 $ - EA Junction Structure #4 (24" or smaller) $ 4,000.00 $ - EA Outlet Structure $ 7,000.00 $ -
EA Catch Basin 3.5' Width $ 7,200.00 $ -
EA Catch Basin 7' Width/L.D. $ 7,900.00 $ -
EA Catch Basin 10' Width/L.D. $ 9,950.00 $ -
EA Catch Basin 14' Width/L.D. $ 11,000.00 $ -
EA Catch Basin 21' Width/L.D. $ 13,000.00 $ -
LF
18 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 200.00 $
LF
24 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 240.00 $
LF
27 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 260.00 $
LF
30 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 280.00 $
LF
33 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 295.00 $
LF
36 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 310.00 $
LF
39 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 320.00 $
LF
42 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 330.00 $
LF
45 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 360.00 $
LF
48 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 385.00 $
LF
54 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 440.00 $
LF
60 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 500.00 $
EngCostEstimate Page 7 of 10 Effective Date: January 1, 2021 143
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
STORM DRAIN
LF
66 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 560.00 $
LF
72 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 625.00 $
LF
78 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 690.00 $
LF
84 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 765.00 $
LF
90 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 830.00 $
LF
96 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 920.00 $
LF
102 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
LF
108 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,075.00 $
LF
7' x 6' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 700.00 $
LF
7' x 8.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ - 820.00 $
LF
7' x 9.5' RCB Installed, including excavation, bedding, backfill and pavement restoration $ - 870.00 $
LF
8' x 11' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
LF
8' x 13' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,100.00 $
LF
9' x 9' RCB Installed, including excavation, bedding,
backfill and pavement restoration $ - 1,000.00 $
EA 24" CMP Riser $ 1,250.00 $ -
LF 24" CSP Pipe $ 200.00 $ -
EA PIPE END CAPS $ 200.00 $ -
LF 8" HDPE N12 DRAIN PIPE $ 50.00 $ -
1 EA Final Punchlist Work $ 25,000.00 $ 25,000.00
STORM DRAIN
STORM DRAIN SUBTOTAL $ 25,000.00
LS Mobilization (5% of Construction Cost) 0% - $
LS Traffic Control (5% of Construction Cost) 0% - $
GRAND TOTAL STORM DRAIN ONLY $ 25,000.00
EngCostEstimate Page 8 of 10 Effective Date: January 1, 2021 144
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
DIRECT COSTS GRAND TOTAL STREETS ONLY 716,020.00 $
GRAND TOTAL WATER ONLY $ 25,000.00
GRAND TOTAL RECYCLED WATER ONLY $ 25,000.00
GRAND TOTAL SEWER ONLY $ 25,000.00
GRAND TOTAL STORM DRAIN ONLY $ 25,000.00
GRAND TOTAL (FOR PLAN CHECK & INSPECTION FEE
DETERMINATION) $ 816,020.00
PROJECT ADDITIVES Project Contingencies 10% $ 81,602.00 Construction Staking 3% $ 24,480.60
Soils Testing 1% $ 8,160.20
Material Testing 1% $ 8,160.20
Construction Inspection 4.8% $ 39,168.96
Contract Administration 1% $ 8,160.20
GRAND TOTAL (FOR BOND AMOUNTS) $ 985,752.16
Faithful Performance Bond (100% of Construction Cost) $ 0.24 Labor & Material Bond (50% of Construction Cost)
Warranty Bond (10% of Construction Cost)
EngCostEstimate Page 9 of 10 Effective Date: January 1, 2021 145
RESOLUTION NO 2020-080
EXHIBIT C
CITY OF CHINO
ENGINEERING COST ESTIMATE
PROJECT NO: Tract No. 16420-6
LOCATION : East Preserve Loop at Main Street
By: TS
DATE: January 9, 2025
Quantity Unit Item Unit Total Cost
Price Per Item
C. Berard
45183
BY ENGINEER
Prepared By:
R.C.E. Number:
Expiration:
Place R.C.E. Stamp and Signature Here (required)
BY CITY
$ 985,800.00
$ 492,900.00
$ 98,600.00
Faithful Performance Bond (100% of Construction Cost)
Labor & Material Bond (50% of Construction Cost)
Warranty Bond (10% of Construction Cost)
EngCostEstimate Page 10 of 10 Effective Date: January 1, 2021 146
147
Block 11
Backbone Street
Bond
Block 11 Sewer,
SD,Water,RW
Bond
Block 11
Backbone
Street Bond
(Reduction)
Block 11 Sewer,
SD,Water,RW
Bond
(Reduction) Street Bond Wets Bond
Street Bond
(Reduced)
Wets Bond
(Reduced) Street Bond Wets Bond
Street Bond
(Reduced)
Wets Bond
(Reduced) - Street Bond Wets Bond
Street Bond
(Reduced)
Wets Bond
(Reduced) Street Bond Wets Bond
Street Bond
(Reduced)
Wets Bond
(Reduced) -
Faithful Performance
Bond (100% of
Construction Cost) $ 3,103,741.72 $ 3,219,412.52 $ 748,020.00 24.10% $ 643,882.50 20.00% $ 524,114.18 $ 644,326.42 $ 143,660.21 27.41% $ 128,865.28 20.00% $ 1,823,954.24 $ 2,364,010.78 $ 545,587.05 29.91% $ 472,802.16 $ 109,117.41 $ 727,098.06 $ 1,023,881.48 $ 186,670.00 25.67% $ 204,776.30 20.00% $ 1,007,104.00 $ 1,182,212.06 $ 285,209.40 28.32% $ 236,442.41 $ 57,041.88 Labor & Material Bond
(50% of Construction
Cost) $ 1,551,870.86 $ 1,609,706.26 $ 374,010.00 24.10% $ 321,941.25 20.00% $ 262,057.09 $ 322,163.21 $ 71,830.11 27.41% $ 64,432.64 20.00% $ 911,977.12 $ 1,182,005.39 $ 272,793.53 29.91% $ 236,401.08 $ 54,558.71 $ 363,549.03 $ 511,940.74 $ 93,335.00 25.67% $ 102,388.15 20.00% $ 503,552.00 $ 591,106.03 $ 142,604.70 28.32% $ 118,221.21 $ 28,520.94 Warranty Bond (10% of
Construction Cost) $ 310,374.17 $ 321,941.25 $ 310,374.17 100.00% $ 321,941.25 100.00% $ 52,411.42 $ 64,432.64 $ 52,411.42 100.00% $ 64,432.64 100.00% $ 182,395.42 $ 236,401.08 $ 182,395.42 100.00% $ 236,401.08 $ 182,395.42 $ 72,709.81 $ 102,388.15 $ 72,709.81 100.00% $ 102,388.15 100.00% $ 100,710.40 $ 118,221.21 $ 100,710.40 100.00% $ 118,221.21 $ 100,710.40 Bond# 24282451 24282446 24282453 24282448 24282452 24282447 24282455 24282450 24252454 24282449 Description
16420-6 OnsiteLot 2 & 3 Intract
Street Imps
16420-6 OnsiteLot 2 & 3
Intract
16420-6 Onsite- Lot
4 & 7 Intract
Street Imps
16420-6 OnsiteLot 4 & 7 Intract
Wet Util.
16420-6 OnsiteLot 5,6 & 8
Intract
16420-6 OnsiteLot 5,6 & 8
Intract Wet Util.
16420-6 OnsiteLot 9 Intract
Street Imps
16420-6 OnsiteLot 9 Intract
Wet Util. Imps
Lennar Shea Homes Richmond American Beazer
Note: Cells in green highlight represent values in which estimated remaining costs are less than 20% of initial bond amount per the prior tabs. Values set at 20% of original bond amount Backbone Lots 2 & 3 Lots 4 & 7 Lots 5,6,8 Lot 9
148
149
150
151
152
153
154
155
156
01225.0006/366470.2 C-1
EXHIBIT “C”
TRACT NO. 16420-6 (LOT 9)
RICHMOND AMERICAN HOMES OF MARYLAND, INC.
ENVIRONMENTAL WARRANTY
As a condition precedent to acceptance of the dedications and public improvements to be conveyed by the above-named Subdivider to the City of Chino for the above-referenced Subdivision, Subdivider hereby warrants to the City of Chino that:
1. Neither the property to be dedicated nor Subdivider are in violation of any environmental law, and neither the property to be dedicated nor the Subdivider are subject to any existing, pending or threatened investigation by any federal, state or local governmental authority under or in connection with the environmental laws relating to the property to be dedicated.
2. Neither Subdivider nor any other person with Subdivider’s permission to be upon the property to be dedicated has used, generated, manufactured, produced, or released, on, under, or about the property to be dedicated, any Hazardous Substance except in compliance with all applicable environmental laws. For the purposes of this warranty, the term “Hazardous Substances” shall mean any substance or material which is capable of posing a risk of injury to health, safety or property, including all those materials and substances designated as hazardous or toxic by any federal, state or local law, ordinance, rule, regulation or policy, including but not limited to, all of those materials and substances defined as “Toxic Materials” in Sections 66680 through 66685 of Title 22 of the California Code of Regulations, Division 4, Chapter 30, as the same shall be amended from time to time, or any other materials requiring remediation under federal, state or local laws, ordinances, rules, regulations or policies.
3. Subdivider has not caused or permitted the release of and has no knowledge of the release or presence of any Hazardous Substance on the property to be dedicated or the migration of any hazardous substance from or to any other property adjacent to, or in the vicinity of, the property to be dedicated.
4. Subdivider’s prior and present use of the property to be dedicated has not resulted in the release of any Hazardous Substance on the property to be dedicated.
5. All persons executing this warranty hereby represent and warrant to the City of Chino, and Subdivider hereby represents and warrants, that the signators hereto have the legal power, right and authority to execute this warranty on behalf of the Subdivider and that the signators hereto have sufficient knowledge or expertise, either personally, through reasonable inspection and investigation of the property, or through reasonable reliance upon the investigation and professional opinion of Subdivider’s environmental experts, to make the representations herein, and that no consent of any other party is 157
01225.0006/366470.2 C-2
required to execute this warranty and make the representations herein on behalf of the Subdivider to the City of Chino.
Each of the undersigned persons declares under penalty of perjury that the foregoing is true and correct.
Dated: _________________________
RICHARD AMERICAN HOMES OF MARYLAND, INC.*
By:
*Proof of authorization for Subdivider’s signatures is required to be submitted concurrently with this environmental warranty.
158
MEMORANDUM
CITY OF CHINO
COMMUNITY SERVICES, PARKS & RECREATION DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: LINDA REICH, CITY MANAGER
FROM: SILVIA AVALOS, DIRECTOR OF COMMUNITY SERVICES, PARKS &
RECREATION
SUBJECT
..titl e
Award of Contract – Citywide HVAC Preventative Maintenance and Repairs. ..end
RECOMMENDATION
..recommendation
1) Award a contract with C.E. Mechanical Inc., Chino, CA for Citywide Heating Ventilation Air Conditioning (HVAC) Preventative Maintenance and Repairs in the amount of $476,000 for preventative maintenance and $900,000 for repairs for a total not-to-exceed contract amount of $1,376,000 for two and one-half years through June 30, 2028, and two additional one-year options to renew; 2) appropriate $75,000 to the Building Management Fund; and 3) authorize the City Manager to execute all necessary documents on behalf of the City. ..body
FISCAL IMPACT
Requires an additional appropriation of $75,000 from the available Building Management Fund Balance 650. Funding for subsequent years will be requested as part of the annual budget process.
Initial Six Months Funding Summary for Preventative Maintenance Building Management Fund 650 $50,000
Additional Appropriation from the Building Mgmt. Fund 650 $75,000 Total Contract Funding Summary for Initial Six Months $125,000 Total Contract Summary
Preventative Maintenance Initial Six Months (through FY 2026) $125,000 Preventative Maintenance Year 2 (FY 2026-27) $172,000
Preventative Maintenance Year 3 (FY 2027-28) $179,000
Repairs (January 2026–June 2028) $900,000
Total Two and One-Half Year Contract $1,376,000
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above further the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
159
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: AWARD OF CONTRACT - CITYWIDE HVAC PREVENTATIVE MAINTENANCE AND REPAIRS.
PAGE: 2
Financial Stability
Responsible Long-Range Planning
Revenue: Expenditure: 6508310-43580 and 6508310-43585
Transfer In: Transfer Out:
160
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: AWARD OF CONTRACT - CITYWIDE HVAC PREVENTATIVE MAINTENANCE AND REPAIRS.
PAGE: 3
BACKGROUND
The City of Chino has an HVAC inventory of approximately 130 pieces of equipment to service its facilities. With the exception of the Police facility, no documents have been found regarding a previous HVAC preventive maintenance contract for all other facilities. It is important to have scheduled preventative maintenance on HVAC equipment to properly clean, maintain, and monitor all systems per industry standards. Having a HVAC preventative maintenance contract will benefit the City in several ways, including extending the lifespan of HVAC equipment and better proactive preparation when repairs and replacements are required. It is particularly important now, given that staff is in the preliminary design phase to replace the entire HVAC system at City Hall.
The Fiscal Year 2025-26 Adopted Budget includes funding for Citywide HVAC repair and replacement services only. Although the Community Services, Parks & Recreation Department, Parks and Facilities team is addressing the aging HVAC infrastructure annually, most of the equipment has outlived its lifespan and require reoccurring repairs to keep functioning. Industry standards state the average lifespan of commercial used HVAC equipment is 15-25 years. Staff has identified that 84% of Chino’s HVAC equipment is older than 15 years and 19% is older than 25 years.
ISSUES/ANALYSIS
On July 10, 2025, the City released a Request for Proposals (RFP No. 2025-0015A) for "Citywide HVAC Preventative Maintenance and Repairs" via PlanetBids in accordance with City procurement policies. The City received six proposals by the closing date of August 7, 2025. A review committee, consisting of City staff, evaluated proposals separately to maintain confidentiality and fairness. Staff then scored these proposals using the following weighted criteria:
Experience/Qualifications: 30%
Past Performance/References: 20%
Plan Methodology/Project Approach: 20%
Quality and Responsiveness of Proposal: 15%
Cost Evaluation: 15%
Following evaluation, C.E. Mechanical, Inc. received the highest average score and is recommended for contract award. For the past two years, the City has maintained a contract with C.E. Mechanical, Inc. for citywide HVAC repairs only. Throughout their tenure with the City, C.E. Mechanical, Inc. has consistently provided a reliable and satisfactory level of repair service.
On July 10, 2025, the City released a Request for Proposals (RFP No. 2025-0015A) for "Citywide HVAC Preventative Maintenance and Repairs" via PlanetBids in accordance with City procurement policies. The City received six proposals by the closing date of August 7, 2025. A review committee, consisting of City staff, evaluated proposals separately to maintain confidentiality and fairness. Staff then scored these proposals using the following weighted criteria:
Experience/Qualifications: 30%
161
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: AWARD OF CONTRACT - CITYWIDE HVAC PREVENTATIVE MAINTENANCE AND REPAIRS.
PAGE: 4
Past Performance/References: 20%
Plan Methodology/Project Approach: 20%
Quality and Responsiveness of Proposal: 15%
Cost Evaluation: 15%
Following evaluation, C.E. Mechanical, Inc. received the highest average score and is recommended for contract award. For the past two years, the City has maintained a contract with C.E. Mechanical, Inc. for citywide HVAC repairs only. Throughout their tenure with the City, C.E. Mechanical, Inc. has consistently provided a reliable and satisfactory level of repair service.
Evaluation Results:
RANKING CONTRACTOR
1 C.E. Mechanical, Inc.
2 EMCOR Services Mesa Energy Systems
3 ACCO Engineered Systems, Inc.
4 Artic Cooling Systems
5 Diversified Thermal Services, Inc.
6 Johnson Controls, Inc.
Staff requests City Council approval to award a contract to C.E. Mechanical, Inc. for Citywide HVAC Preventative Maintenance and Repairs, in the amount not-to-exceed of $1,376,000 for two and one-half years through June 30, 2028, with two additional one-year options to renew.
Attachment: C.E. Mechanical, Inc. Agreement
162
01225.0006/515653.2
Contract No.:
Approved:
AGREEMENT
“CITYWIDE HVAC PREVENTATIVE MAINTENANCE AND REPAIRS”
THIS AGREEMENT is made and entered into this 2nd day of December, 2025 by and between THE CITY OF CHINO, a municipal corporation, hereinafter called “City”, and C.E.
MECHANICAL, INC., hereinafter called “Contractor”.
WITNESSETH, that the parties hereto mutually agree as follows:
ARTICLE I: For and in consideration of the payments and agreements hereinafter mentioned to be made and performed by City, Contractor agrees to perform and complete all of the work for the project entitled “CITYWIDE HVAC PREVENTATIVE MAINTENANCE AND REPAIRS” in a good and workmanlike manner in accordance with all plans and specifications therefor, to furnish at Contractor’s sole cost and expense all tools, equipment, labor, and materials necessary therefor, except such materials and equipment as are expressly stipulated to be furnished by City, and to do everything required by the Contract Documents.
ARTICLE II: Contractor shall be responsible for furnishing all labor, materials, equipment, tools, and services, furnishing and removing all plants, temporary structures, tools, and equipment, and doing everything required by this Agreement and by the Contract Documents. Contractor shall also be responsible for all losses and damages arising out of the performance of the Work, from the action of the elements, or from any unforeseen difficulties that may arise during the prosecution of the Work until its acceptance by City; for all risks of every description associated with the Work; and for all expenses resulting from the suspension or discontinuance of the Work.
City shall pay Contractor, and Contractor shall receive, for completing the Work in accordance with the requirements of the Contract Documents and in full compensation therefor, the price named in the Bid Proposal. Subject to any additions or deductions that may be made by change order or amendment, and any penalties or damages that may be assessed against Contractor, Contractor shall receive a total contract amount of One Million Three Hundred Seventy-Six Thousand Dollars and Zero Cents ($1,376,000.00) for completion of the contract work.
ARTICLE III: The City hereby employs said Contractor to perform the work according to the terms of this Agreement for the above-mentioned price(s), and agrees to pay the same at the time, in the manner, and upon the conditions stipulated in the Contract Documents; and the said parties for themselves, their heirs, executors, administrators, successors and assignees, do hereby agree to the full performance of the covenants herein contained.
ARTICLE IV: The term of this Agreement shall commence as of January 1, 2026. The term of this Agreement shall expire on June 30, 2028, unless the City exercises its option to renew for two (2) additional one (1) year terms.
ARTICLE V: The Notice Inviting Bids, the Summary of Work, the Instructions to Bidders, the Bid Documents, the Required Post-Bid Documents, the General Provisions, the Special Provisions, the Technical Specifications, and all other drawing, plans, or specifications for the Work (collectively, “Contract Documents”) are hereby incorporated into and made part of this Agreement.
163
01225.0006/515653.2
ARTICLE VI: Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with Contractor's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. In instances where City is shown to have been actively negligent and where City’s active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City. Should conflict of interest principles preclude a single legal counsel from representing both City and Contractor, or should City otherwise find Contractor’s legal counsel unacceptable, then Contractor shall reimburse the City its costs of defense, including without limitation reasonable attorneys’ fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
ARTICLE VII: No officer or employee of the City shall have any financial interest in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which affects his financial interest or the financial interest of any corporation, partnership or association in which he is interested, in violation of any State statute or regulation.
Similarly, Contractor warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.
ARTICLE VIII: This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of San Bernardino, State of California, or any other appropriate court in such county, and Consultant covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S.
District Court, venue shall lie exclusively in the Central District of California, in the County of San Bernardino, State of California.
ARTICLE IX: Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement.
Acceptance by City of any work or services by Contractor shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.
ARTICLE X: No officer or employee of the City shall be personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms 164
01225.0006/515653.2
of this Agreement.
ARTICLE XI: The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply.
ARTICLE XII: In the course of its work under this Agreement, the Contractor, its agents and employees shall be bound by and comply with all applicable federal, state and local laws and requirements.
ARTICLE XIII: The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. [SIGNATURES ON FOLLOWING PAGE]
165
01225.0006/515653.2
IN WITNESS WHEREOF, the parties hereto have caused this contract to be executed on the day and year first above written.
Approved as to Form: Approved as to Content:
City Attorney Silvia Avalos, Director of Community
Services, Parks & Recreation
CONTRACTOR
Dated: By:
(Signature)
Name:
(Please Type or Print Name)
Title:
(Please Type or Print Title)
CITY OF CHINO
Dated:
Linda Reich, City Manager
ATTEST:
Natalie Gonzaga, City Clerk
Date
166
Request for Proposal No. 2025-0015A
CITYWIDE HVAC PREVENTATIVE
MAINTENANCE AND REPAIRS
P T #y
CITY OF CHINO / PURCHASING
Contract Documents
167
1 TABLE OF CONTENTS
A. INTRODUCTION................................................................................................................................................................................. 2 A1. Overview.............................................................................................................................................................................................................................2 A2. About the City...................................................................................................................................................................................................................2 A3. Proposed Schedule .........................................................................................................................................................................................................2 B. INSTRUCTIONS TO PROPOSERS...................................................................................................................................................... 3 B1. Submission of RFP ...........................................................................................................................................................................................................3 B2. Questions and Addenda................................................................................................................................................................................................3 B3. Validity of Proposals .......................................................................................................................................................................................................3 B4. Confidentiality...................................................................................................................................................................................................................3 B5. Proposer RFP Examination............................................................................................................................................................................................3 B6. Proposal Compliance......................................................................................................................................................................................................4 B7. Proposal Rejection...........................................................................................................................................................................................................4 B8. Pre-Contractual Expenses..............................................................................................................................................................................................4 B9. Negotiations ......................................................................................................................................................................................................................4 B10. Contract............................................................................................................................................................................................................................4 B11. Protest Procedures........................................................................................................................................................................................................5 C. PROPOSAL REQUIREMENTS............................................................................................................................................................. 6 C1. Cover Letter / Letter of Introduction.........................................................................................................................................................................6 C2. Experience and Qualification of the Firm.................................................................................................................................................................6 C3. Project Team Qualifications/Qualifications of Key Personnel ...........................................................................................................................6 C4. References..........................................................................................................................................................................................................................6 C5. Plan Methodology/Project Approach .......................................................................................................................................................................6 C6. Sealed Fee Proposal........................................................................................................................................................................................................6 C7. Conflict of Interest Statement......................................................................................................................................................................................7 C8. Acknowledgement of Insurance Requirements.....................................................................................................................................................7 C9. Acknowledgement of Terms and Conditions .........................................................................................................................................................7 C10. Appendices......................................................................................................................................................................................................................7 D. EVALUATION CRITERIA .................................................................................................................................................................... 8 D1. Experience/Qualifications .............................................................................................................................................................................................8 D2. Plan Methodology / Project Approach.....................................................................................................................................................................8 D3. Past Performance/Reference .......................................................................................................................................................................................8 D4. Quality of Responsiveness of Proposal ....................................................................................................................................................................8 D5. Competitive Pricing.........................................................................................................................................................................................................8 E. SELECTION PROCESS......................................................................................................................................................................... 9 E1. Selections ...........................................................................................................................................................................................................................9 E2. Award...................................................................................................................................................................................................................................9 E3. Implementation.................................................................................................................................................................................................................9 E4. Insurance Requirements...........................................................................................................................................................................................9-11 F. SCOPE OF SERVICES ...................................................................................................................................................................12-32 ATTACHMENTS........................................................................................................................................................................................33 Attachment A: Required Form ..........................................................................................................................................................................................33 168
2 INTRODUCTION
A1 OVERVIEW
The City of Chino (“City”) is seeking proposals from qualified firms (“Proposers”) to establish a contract for Citywide HVAC Preventative Maintenance and Repairs RFP#2025-0015A. Work provided shall be in accordance with the Scope of Service requirements herein. The City welcomes proposals from all qualified firms.
A2 About the City
The City of Chino was incorporated as a general law City on February 28, 1910. Chino has a separately elected Mayor and four Council members, each elected to overlapping four-year terms. The Mayor and Council appoint the City Manager and City Attorney, with department directors appointed by the City Manager.
The City provides a full range of services for its citizens, including police services, parks and recreation programs, planning and development, and street maintenance and lighting. It also operates water, sewer, and storm drain utilities and provides for refuse collection, and cable television through outside contracts.
The City also provides its citizens with a wide range of recreational opportunities through activities at the Senior Citizens Center and youth activities at the Neighborhood Activity Center, as well as providing a unique balance of human services programs that assist youth and families with a comprehensive counseling program.
In addition, the City's Public Works Department provides many street and infrastructure improvements.
A3 Proposed Schedule
Timeline Dates
Mandatory Pre-Bid Meeting July 18, 2025 Time: 8:00 a.m.
Address: Chino City Hall 13220 Central Avenue, Chino, CA 91710 Public Entrance near Flagpoles/Fountain
*Meeting mandatory if you did not attend the pre-bid meeting on 06/06/25 (under RFP# 2025-0015). Attendance at both pre-bid meetings is not necessary.
Questions Due Date July 24, 2025 Time: 10:00 a.m.
Proposals Due Date August 7, 2025 Time: 10:00 a.m.
Electronic proposals are due on or before the date and time specified above.
LATE PROPOSALS WILL NOT BE ACCEPTED REGARDLESS OF CIRCUMSTANCES.
City Council Award Date (Tentative) September 16, 2025
169
3 B. INSTRUCTIONS TO PROPOSERS
B1 SUBMISSION OF RFP
All proposals must be submitted online via PlanetBids at https://www.planetbids.com/portal/portal.cfm?CompanyID=26384.
The City will only accept proposals submitted online via PlanetBids on or before the Proposal Due Date specified in this RFP. Interested firms must be registered on the City’s PlanetBids portal in order to participate in this RFP.
All documents specified in Section C, “Proposal Requirements,” shall be scanned and uploaded to PlanetBids including the fee proposal. Any proposal submitted other than in the manner specified in this RFP will be rejected.
B2 QUESTIONS AND ADDENDA
All questions or requests for interpretation regarding this RFP must be submitted online through PlanetBids.
Proposers are not to contact City personnel with any questions or clarifications concerning this RFP other than through PlanetBids. Any City response for this RFP that is not posted through PlanetBids is unauthorized and will be considered invalid.
If clarification or interpretation of this solicitation is considered necessary by the City, a written addendum shall be issued. Any interpretation of or correction to this solicitation will be made only by addendum issued through PlanetBids. It is the responsibility of each Proposer to ensure that they have received and reviewed any and all addenda to this RFP. For technical support with the PlanetBids system, contact PlanetBids at (818) 992-1771.
B3 VALIDITY OF PROPOSALS
Proposals must be valid for a period of at least 120 calendar days from the closing date and time for receipt of proposals.
B4 CONFIDENTIALITY
Proposals are not to be marked as confidential or proprietary. City may refuse to consider any proposal so marked. Proposals submitted in response to this RFP may become subject to public disclosure. The City shall not be liable in any way for disclosure of any such records. Additionally, all proposals shall become the property of the City.
B5 PROPOSER RFP EXAMINATION
By submitting a proposal, Proposer represents that it has thoroughly examined City’s requirements and is familiar with the services required under this RFP and that it is qualified and capable of providing the services to achieve City’s objectives.
B6 PROPOSAL COMPLIANCE
Each Proposer must submit its proposal in strict accordance with all requirements of this RFP and compliance must be stated in the proposal. Deviations, clarifications and/or exceptions must be clearly identified and listed separately as alternative items for the City’s consideration. 170
4 B. INSTRUCTIONS TO PROPOSERS
B7 PROPOSAL REJECTION
Any proposal may be rejected if it is conditional, incomplete, or deviates from specifications in this RFP. The City reserves the right to waive, at its discretion, any procedural irregularity, immaterial defects, or other improprieties which City deems reasonably correctable or otherwise not warranting rejection of the proposal.
Any waiver of a requirement in this RFP will not excuse a Proposer from full compliance with the City’s requirements for the work.
B8 PRE-CONTRACTUAL EXPENSES
The City shall not, in any event, be liable for any pre-contractual expense incurred by the Proposer in the preparation of its proposal. Pre-contractual expenses are defined as expenses incurred by the Proposer in:
Preparing its proposal in response to this RFP
Submitting its proposal to the City
Negotiating with the City on any matter related to the proposal Any other expenses incurred by the Proposer prior to date of contract award B9 NEGOTIATIONS
The City reserves the right to: a) negotiate the final Contract with any Proposer(s); b) withdraw this RFP in whole or in part at any time without prior notice and, furthermore, makes no representations that any Contract will be awarded to any Proposer responding to this RFP; c) award its total requirements to one Proposer or to apportion those requirements among two or more Proposers; or d) reject any proposal if it is conditional, incomplete or deviates significantly from the requirements in this RFP. In addition, negotiations may or may not be conducted with Proposer; therefore, the proposal submitted should contain Proposer’s most favorable terms and conditions, since the selection and award may be made without discussion with any Proposer.
B10 CONTRACT
It is anticipated that the contract(s) resulting from this RFP, if awarded, will be effective for one (1) year, with the option to renew for four (4) additional one-year periods, unless otherwise stated in this RFP. The City reserves the right to cancel the contract at any time, with or without cause, upon thirty (30) days’ prior written notice to Consultant of its intent to terminate.
Proposers shall provide firm, fixed pricing for the initial one-year term. For Years 2 through 5, proposers must include proposed annual pricing and any applicable price escalation methodology, such as Consumer Price Index (CPI) adjustments. CPI-based increases must reference a specific index (e.g., CPI-U, Los AngelesRiverside-Orange County) and include a not-to-exceed cap of __% per year. All renewal periods are contingent upon City approval, contractor performance, and budget availability. 171
5 B. INSTRUCTIONS TO PROPOSERS
B11 PROTEST PROCEDURES
Only a Proposer who has actually submitted a proposal in response to this RFP is eligible to submit a protest.
The City will not accept or entertain RFP protests from anyone who did not submit a proposal for the project or work being protested.
Proposers may file a protest of an RFP with the Finance Department – Purchasing Division, City of Chino, 13220 Central Avenue, Chino, CA 91710, no later than 4:00 p.m. on the fifth business day from the date the Notice of Intent to Award was announced.
At the time of the filing, the protest shall:
a. Be submitted on the Proposer’s formal letterhead and include the Proposer’s company name, address, phone number and the name and title of the individual filing the protest; b. List the reasons for the protest including the specific section of the documents or technical specifications being disputed; and
c. Site any statutes or case law supporting or serving as the basis for the protest and describe how they support the item(s) being disputed.
If the protest does not meet these requirements, the City will reject it without further review. If the protest is submitted on time and complies with all the above requirements, the Director of Finance or his designee, shall review the protest and all relevant information submitted by the protestor. The City will provide a written response to the protestor. The City has the right to respond to any protest until the date on which the contract is awarded by the Chino City Council.
The procedure and time limits set forth in this paragraph are mandatory and are the sole and exclusive remedy in the event of an RFP protest. Failure to comply with these procedures shall constitute a failure to exhaust administrative remedies and a waiver of any right to further pursue the proposal protest, including filing a Government Code Claim or legal proceedings.
If the City determines that the protest is frivolous, the party originating the protest may be determined to be non-responsible and may be determined to be ineligible for future contract awards. 172
6 C. PROPOSAL REQUIREMENTS
Proposal shall be up to a TOTAL page limit of twenty-five (25) pages (NOT INCLUDING dividers, transmittal letter, table of contents, and required forms). Proposers should not include any unnecessarily elaborate promotional material. Lengthy narrative is discouraged, and proposal should be brief, clear and concise.
C1 COVER LETTER/ LETTER OF INTRODUCTION
Proposals must be signed and include a letter of introduction along with firm name, website, address, telephone number, email, and name of person authorized to submit the proposal and who will have contractual responsibility with the City of Chino, along with the person’s title. If the firm operates from more than one location, please specify the office to which this project will be assigned. Identify all sub-consultants that will be involved. Include a statement that the proposal shall remain valid for a period of not less than 120 days from the date of submittal. Include a statement attesting that all information submitted with the proposal is true and correct.
C2 EXPERIENCE AND QUALIFICATION OF THE FIRM
Proposals must describe the firm’s qualifications possessed to perform services under the engagement.
Include information about pertinent prior experience, number of years the firm has been in business, specialized expertise, and experience with California municipalities. This section of the proposal should establish that the contractor can satisfactorily perform the required work, the requisite previous experience on similar assignments, and the stability and professional standing of the firm. The proposal must include the firm’s valid California Contractor License (C-20), including the license number, issue date, and current license status. Firms must also confirm their financial capacity and bonding ability to furnish 100% Payment and Performance bonds, as required for this contract.
C3 PROJECT TEAM QUALIFICATIONS/QUALIFICATIONS OF KEY PERSONNEL Proposals must include a brief description of the proposed representative(s) and key staff. Include a chart identifying the key personnel assigned to the project and their respective resume(s). Identify any consultants/sub-consultants that you would expect to use, noting relevant disciplines. Include information regarding those firm(s) qualifications.
C4 REFERENCES
The proposal must include the firm and sub-consultant(s) references. Please provide reference information and brief project descriptions for at least three (3) current clients. Reference projects should have been completed within the last four (4) years and similar in nature to those described in this RFP. Please include the following:
1. Name of client.
2. Name and title of client’s primary contact.
3. Telephone number, email address, and mailing address of the client’s primary contact.
4. A brief description of the type of services provided, the overall scope of services, duration of the project and status of the project.
173
7 C. PROPOSAL REQUIREMENTS
C5 PLAN METHODOLOGY/PROJECT APPROACH
Describe the services and activities that your firm proposes to provide to the City. Include a statement of your understanding of the assignment(s). Describe your approach and methodology for tasks and scope of services. Contractors are strongly encouraged to suggest refinements and innovative methodologies that ultimately achieve the work products described in the RFP.
C6 SEALED FEE PROPOSAL
The sealed fee proposals must be submitted, in a separate cost file, electronically in PlanetBids. Do not include fees within the body of the proposal. Provide all fees for which compensation is expected.
Proposed fees structure must be clearly itemized to reflect all fees by task, position, rate and hours, as well as miscellaneous billing fees. This original fee proposal must be received by the RFP due date and time specified. Please ensure that prevailing wage is included, if applicable.
It is anticipated that the contract(s) resulting from this RFP, if awarded, will be effective for one (1) year, with the option to renew for four (4) additional one-year periods, unless otherwise stated in this RFP. The City reserves the right to cancel the contract at any time, with or without cause, upon thirty (30) days’ prior written notice to Consultant of its intent to terminate.
Proposers shall provide firm, fixed pricing for the initial one-year term. For Years 2 through 5, proposers must include proposed annual pricing and any applicable price escalation methodology, such as Consumer Price Index (CPI) adjustments. CPI-based increases must reference a specific index (e.g., CPI-U, Los AngelesRiverside-Orange County) and include a not-to-exceed cap of __% per year. All renewal periods are contingent upon City approval, contractor performance, and budget availability.
C7 CONFLICT OF INTEREST STATEMENT
Complete and submit the Conflict of Interest Statement (Attachment A) with the proposal.
C8 ACKNOWLEDGEMENT OF INSURANCE REQUIREMENTS
Complete and submit the Acknowledgement of Insurance Requirements (Attachment A) with the proposal.
C9 ACKNOWLEDGEMENT OF TERMS AND CONDITIONS
Complete and submit the Acknowledgement of Terms and Conditions (Attachment A) with the proposal.
Any requests for exceptions to the terms of the RFP and Professional Services Agreement (Attachment B) must be noted and submitted on this required attachment. If no exceptions to the terms are requested, please confirm by stating “none.”
C10 APPENDICES
Information considered by Proposer to be pertinent to this RFP and which has not been specifically solicited in any of the aforementioned sections may be placed in a separate appendix section. Proposers are cautioned, however, that this does not constitute an invitation to submit large amounts of extraneous materials. Appendices shall be relevant and brief.
174
8 D. EVALUATION CRITERIA
All proposals will be reviewed by a Selection Committee established by the City. The City’s final selection will not be based on any single factor, including price. A firm may be eliminated from consideration for failure to comply with any of the requirements of this RFP, depending upon the critical nature of such requirements. Proposal will be evaluated on the criteria specified below:
D1 EXPERIENCE/QUALIFICATIONS 30%
Proposer’s experience in performing work of a similar nature, experience working with public agencies and particularly California municipalities, and strength, resources, and stability of the firm. This will include an assessment of whether the proposal provides detailed information about key personnel and whether such personnel meet established experience requirements and have sufficient training and credentials. This will also include an assessment of whether the allocation of personnel to the project is appropriate for meeting project expectations.
D2 PLAN METHODOLOGY/PROJECT APPROACH 20%
This will include an assessment of the detailed description of the approach and methodology to be used to accomplish the Scope of Services of the RFP, including whether the work plan provided is clear and detailed and demonstrates ability to meet the City’s objectives, and whether the work plan includes identified benchmarks and practices. This will also include an assessment of whether the Proposer is capable of performing the services promptly, within the time specified, and without delay.
D3 PAST PERFORMANCE/REFERENCES 20%
This will include an assessment of the Proposer’s prior experience in performing similar services for other public entities based on provided references, including an assessment of the character, integrity, reputation, and judgment of the Proposer.
D4 QUALITY OF RESPONSIVENESS OF PROPOSAL 15%
This will include an assessment of the completeness of the Proposer’s response in accordance with the RFP instructions and the thoroughness of proposal, including whether all required information is provided in the format specified.
D5 COMPETITIVE PRICING 15%
This will include an assessment of whether the price proposal is fair, reasonable, and competitive, and whether the cost schedule aligns with the project schedule. 175
9 E. SELECTION PROCESS
E1 SELECTION
All proposals will be reviewed by a Selection Committee established by the City. The City will review proposals and check references. Each reviewer will use the evaluation criteria set forth in this RFP and score each RFP independently.
The highest-ranking proposals may be invited to the City for interviews with the Selection Committee.
It is the City’s intent to select one (1) Proposer to provide services; however, the City may, in its sole discretion, enter into contracts with multiple qualified Proposer’s or may reject all proposals and not award a contract at this time.
The City reserves the right to make final decisions regarding the selected Proposer and the number of selected Proposers based on the quantity and quality of the RFPs received. This right extends to modifying the selection process to eliminate interviews if an insufficient number of qualified Proposer’s submit an RFP.
E2 AWARD
The award is based on the criteria in Section D. City shall send a Notice of Intent to Award to all Proposers via PlanetBids, to announce the City’s intent to award the contract to the top-ranked selected Proposer.
E3 IMPLEMENTATION
1. Kick-off Meeting: A Kick-off meeting may be held after award of contract. Consultant and its team will meet with the City staff to conduct introduction, discuss scope of services, and implementation process. The consultant shall plan on monthly meetings to update City staff on project progress.
2. Notice to Proceed: Following the kick-off meeting a formal Notice to Proceed (NTP) may be issued after the agreement is fully executed and all insurance documents and other required documents have been received and approved.
E4 INSURANCE REQUIREMENT
City of Chino insurance requirements for Citywide HVAC Preventative Maintenance and Repairs Contract:
Contractor shall procure and maintain for the duration of the contract, and for 5 years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $1,000,000 per accident for bodily injury and property damage. 176
10 3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
If the contractor maintains broader coverage and/or higher limits than the minimums shown above, the Entity requires and shall be entitled to the broader coverage and/or the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the Entity.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the Entity. The Entity may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or Entity. The CGL and any policies, including Excess liability policies, may not be subject to a self-insured retention (SIR) or deductible that exceeds $25,000 unless approved in writing by Entity. Any and all deductibles and SIRs shall be the sole responsibility of Contractor or subcontractor who procured such insurance and shall not apply to the Indemnified Additional Insured Parties. Entity may deduct from any amounts otherwise due Contractor to fund the SIR/deductible. Policies shall NOT contain any self-insured retention (SIR) provision that limits the satisfaction of the SIR to the Named Insured. The policy must also provide that Defense costs, including the Allocated Loss Adjustment Expenses, will satisfy the SIR or deductible. Entity reserves the right to obtain a copy of any policies and endorsements for verification.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. The Entity, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
2. For any claims related to this project, the Contractor’s insurance coverage shall be primary and noncontributory insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the Entity, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the Entity, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it. This requirement shall also apply to any Excess or Umbrella liability policies.
3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the Entity.
Claims Made Policies
If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.
3. If coverage is cancelled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to the Entity for review. 177
11 5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
Umbrella or Excess Policies: The Contractor may use Umbrella or Excess Policies to provide the liability limits as required in this agreement. This form of insurance will be acceptable provided that all of the Primary and Umbrella or Excess Policies shall provide all of the insurance coverages herein required, including, but not limited to, primary and non-contributory, additional insured, Self-Insured Retentions (SIRs), indemnity, and defense requirements. The Umbrella or Excess policies shall be provided on a true “following form” or broader coverage basis, with coverage at least as broad as provided on the underlying Commercial General Liability insurance. No insurance policies maintained by the Additional Insureds, whether primary or excess, and which also apply to a loss covered hereunder, shall be called upon to contribute to a loss until the Contractor’s primary and excess liability policies are exhausted.
Acceptability of Insurers: Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the Entity.
Waiver of Subrogation: Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the Entity for all work performed by the Contractor, its employees, agents and subcontractors.
Verification of Coverage: Contractor shall furnish the Entity with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause and a copy of the Declarations and Endorsements Pages of the CGL and any Excess policies listing all policy endorsements. All certificates and endorsements and copies of the Declarations & Endorsements pages are to be received and approved by the Entity before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The Entity reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. Entity reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Subcontractors: Contractor shall require and verify that all subcontractors maintain insurance meeting all requirements stated herein, and Contractor shall ensure that Entity is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13.
Duration of Coverage: CGL & Excess liability policies for any construction related work, including, but not limited to, maintenance, service, or repair work, shall continue coverage for a minimum of 5 years for Completed Operations liability coverage. Such Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.
Special Risks or Circumstances: Entity reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances. 178
12 F. SCOPE OF SERVICES
Citywide HVAC Preventative Maintenance, Repairs, and Automation Scope of Work/Specifications It shall be the Contractor’s responsibility to develop and implement a routine maintenance program to effectively maintain, to the satisfaction of the City representative, all aspects of HVAC systems in City commercial facilities. For the purpose of this contract, routine preventative HVAC maintenance shall be defined as quarterly scheduled routine inspection and proactive servicing of HVAC systems to facilitate heating/cooling with a minimal downtime. On-call, as-needed services (24 hours, 7 days a week, 365 days per year) will be for unplanned, and/or emergency repair services, as listed herein.
The routine maintenance and all repairs shall be provided in accordance with the highest standards of the industry, skill, workmanship, applicable trade practices, meet warranties and in conformance to all applicable laws, codes, and regulations. The Contractor’s maintenance program and repairs shall, at a minimum, include but not limited to the specifications outlined herein.
Preventative maintenance and repairs described in this Scope of Work are to be performed on the HVAC equipment at the following locations in City of Chino:
1. Chino Police Department – 5450 Guardian Way
2. City Hall – 13220 Central Ave.
3. City Hall South- 13250 Central Ave.
4. Neighborhood Activity Center (NAC) – 5201 D. St.
5. Children’s Youth Museum – 13191 6th St.
6. Chino Branch Library – 13180 Central Ave.
7. Assemblymember Office - 13160 7th St.
8. Gray Building (Chamber of Commerce) – 13150 7th St.
9. 7th Street Theatre – 13123 7th St.
10. Senior Center – 13170 Central Ave.
11. Carolyn Owens Community Center (COCC) – 13201 Central Ave.
12. Family Services – 13271 Central Ave.
13. Community Building – 5443 B. St.
14. Old School House Museum – 5493 B. St.
15. Public Works Services (Yard) - 5050 Schaefer Ave.
16. Ayala Park Operation Center (APOC) – 5575 Edison Ave.
17. Monte Vista Park – 13196 Monte Vista Ave.
18. Liberty Park – 11860 Telephone Ave.
19. Chino Champion – 13179/13191 9th St.
20. Chaffey Tech Center - 13170 7th St, Chino, CA 91710
21. EPIC Building - 13106 Central Ave, Chino, CA 91710
I. SERVICE SPECIFICATIONS
Preventative maintenance will include any and all costs for providing the necessary labor, tools, travel, equipment, mobilization/demobilization, licenses and incidental materials such as fluids, belts and filters, etc. per the Preventative Maintenance lists below to test, maintain, and diagnose the specified HVAC equipment, including but not limited to air flow analysis, water flow, delta T, humidity, Freon and electronic conditions.
Preventative Maintenance activities shall also specifically include but not limited to the following:
179
13 1. Test and Inspection – All labor to visually inspect and search for worn, failed and/or doubtful parts.
Visually check coil surfaces, fan blades, fan belts, couplings, equipment housings, motor mounts, dampers, valves, fluid levels, VAV boxes, heat exchangers, etc. Make recommendations to the City of any necessary replacements and/or adjustments.
2. Preventative Maintenance and Predictive Maintenance – Labor to perform preventative maintenance on the equipment included. Maintenance intervals for systems and equipment are determined by run time, system use, application, location, and manufacturer’s recommendations.
3. Consumable Materials – Normal consumable materials and supplies, such as lubricants, grease, towels/rags, wire nuts, cleaning solutions, oil and clean-up materials.
4. Air Filter Media and Service – Includes regular air filter changing per the manufacturer’s specifications. Includes monitoring of air filter conditions. Should additional changes be required, Air Filter Media and Service includes notifying the City of any recommended adjustments to the maintenance program.
5. Coil Service – Two (2) Semi-annual cleaning of each condenser coil during the contract year and or per manufacture’s recommendations. Should additional cleaning be required, Coil Service includes notifying the City of any necessary adjustments to this program.
6. Belt Service – This agreement will include one (1) annual belt change for each belt in the system at the beginning of the contract year or per the manufacture’s recommendations. Should additional belt changes be required, Belt Service includes notifying the City of any necessary adjustments to this program. Contractor to provide all belts.
II. PREVENTATIVE MAINTENANCE
Quarterly Service Activities: Along with Preventative Maintenance Regularly Scheduled Activities (see section below), the Quarterly Service Activities will be the City’s primary maintenance program normally scheduled during the month of July, October, January, and April unless otherwise specified by the Maintenance Supervisor or Authorized City Representative.
1. Spring Inspection/Service: The Contractor shall schedule and perform a pre-cooling season maintenance service call. The following services shall be performed in addition to Preventative Maintenance Regularly Scheduled Activities.
A. Cycle units and check pressures and refrigerant charge B. Ensure condensate lines are clean and pump is working properly C. Visually inspect all wiring
D. Check and clean the indoor and outdoor coil if needed E. Replace filters, inspect belts, replace as needed
2. Summer Inspection/Service: The Contractor shall schedule and perform the following in addition to Preventative Maintenance Regularly Scheduled Activities:
A. Replace filters, inspect belts, replace as needed
B. Visually inspect all wiring
180
14 3. Fall Inspection/Service: The Contractor shall schedule and perform a Pre-Heating season maintenance service call. The following services shall be performed in addition to Preventative Maintenance Regularly Scheduled Activities:
A. Cycle and check each unit for proper heating operation B. Check and clean pilot lights and bearings if needed
C. Replace filters, inspect belts, replace as needed
D. Visually inspect all wiring
E. Inspect and service or repair gas radiant tube and space heaters
4. Winter Inspection / Service: The Contractor shall schedule and perform the following services in addition to Preventative Maintenance Regularly Scheduled Activities.
A. Replace filters, inspect belts, replace as needed
B. Visually inspect all wiring
5. Preventative Maintenance Regularly Scheduled Activities: Preventative Maintenance shall be comprehensive and consist (at minimum) of the following:
A. Heating and Air Conditioning Equipment
a) Check with Facility Maintenance Supervisor for operational deficiencies b) Check area around equipment
c) Examine each piece of equipment and device to see that it is functioning properly and is in good operational condition
d) Clean all components of dust, old lubricants, etc. to allow the equipment to function as designed
e) Lubricate all equipment where needed to permit bearings, gears, and all contact wearing points to operate freely and without undue wear f) Adjust all linkages, motors, drives, etc. that have drifted from the initial design settings and positions
g) Calibrate all sensing, monitoring, output, safety, and readout devices for proper ranges, settings, and optimum efficiencies
h) Check system thermostat operation, temperature and pressure controls and adjust as necessary
i) Inspect and tighten all electrical connections
j) Check for proper voltage and amp draw
k) Inspect safeties
l) Inspect all contacts and relays
m) Inspect all wiring for chafing, burning, or deteriorated insulation n) Inspect all breakers
o) Inspect capacitors
p) Check rain guards
q) Check insulation and clamps
r) Check and adjust dampers
s) Lubricate all motors, bearings, and other moving parts t) Inspect air filters and clear or replace as needed (air filters to be provided by Contractor)
181
15 u) Check all applicable belts for proper condition; replace all belts once beginning of each contract year and then as necessary
v) Check all applicable belt tension and adjust as necessary w) Check drives and pulleys for tightness and alignment x) Inspect fan control
y) Inspect and adjust all valves
z) Inspect oil in compressors and add as necessary
aa) Wash fans at beginning of each contract year
bb) Any applicable VAV Boxes are to be serviced once per year cc) Check for unusual noises, vibration, and wear
dd) Carry out other preventative maintenance procedures recommended by the equipment manufacturer
ee) Test and cycle all equipment as a system after it has been cleaned, lubricated, adjusted, and calibrated to see that it is in good operational condition and at optimum efficiency
ff) Provide itemized checklist documentation of preventative maintenance activities per location and report observations and any unusual or out of scope conditions to the Maintenance Supervisor
gg) Recommend the repair of the device by the addition of replacement parts, should the describe maintenance not be adequate
hh) Recommend the replacement of the device if needed, in view of its condition, age, and cost of previous subsequent repair
ii) Provide service tag on all service units, containing the information listed per specifications
B. Heating Equipment
a) Inspect all pilot lights and operation of the ignition system b) Inspect and clean the flame sensor
c) Inspect and adjust burner assembly
d) Inspect flue pipe, diverter, and flue connections
e) Inspect the heat exchanger
f) Inspect heating coils
g) Inspect temperature rise
h) Inspect furnace safety controls
i) Inspect fuel input
j) Inspect for gas leaks
k) Inspect gas valve operation
l) Inspect gas pressure and set factory specifications
m) Inspect backup heat elements
n) Inspect sequencer operation
o) Inspect actual amperage draw on motors
p) Inspect actual voltage to the unit
q) Inspect oil filter and oil pressure switches
r) Inspect all high limits and safety controls
s) Inspect reversing valve operation
t) Inspect valves, step traps, and belts
182
16 u) Inspect any applicable hot water heaters, boilers, and related pumps.
Inspection shall include annual tune-up of burners and cleaning of boilers as required
C. Air Conditioning Equipment
a) Check refrigerant systems for leaks and operation
b) Inspect temperature drop
c) Check condenser general operation and condition and clean condenser coil thoroughly at the beginning of each contract year and then as necessary i. Check for scaling or corrosion of water-cooled condensers, clean as required
ii. Check condition of air-cooled condensers, clean as required d) Check and adjust condensate pumps and drains as necessary e) Inspect and clean condensate drain pan, drains, and traps to ensure proper draining. Inform the Facility Maintenance Supervisor of unusual or discolored drain pan accumulations
f) Inspect condenser fans – blade conditions, clearances, etc. g) Lubricate condenser fan motors and bearings
h) Inspect amp and voltage draw
i) Inspect evaporator coils and clean at the beginning of each contract year, then as necessary
j) Inspect evaporator drip pan, drains, and filters
k) Inspect all compressors and starter – contacts and free movement l) Inspect compressor general operation and condition, oil level, head pressure, and suction pressures
m) Inspect refrigerant pressure and change
n) Inspect refrigerant system for leaks and for potential leak points – chafing lines, cap tubes, etc.
o) Record amount of refrigerant. If applicable, remove from system and replace appropriate amount
p) Inspect unit disconnect system. Record unit voltage – rated and actual q) Inspect “economizer”, if applicable
r) Megohm or oil test compressors – record readings
s) Inspect compressor terminals
t) Inspect disconnect power box
u) Inspect all coils for cleanliness, fin condition
v) Check for leaks in air supply if applicable
w) Inspect the system to avoid the correct freeze up
D. Air Handlers
a) Check and change filters as necessary
b) Replace all belts one time per year
c) Check drive components for wear and alignment
d) Check blower wheels – conditions and cleanliness
e) Inspect blower housing, deck mountings – cracks, loose bolts, etc. f) Check fan bearings
g) Check blower bearings
h) Check blower motor bearings
183
17 i) Lubricate all bearings at least once at the beginning of each contract year and then as necessary
j) Record supply fan amperage – rated and actual
k) Record return fan amperage – rated and actual
l) Inspect and service VFDs located at each AHU per the following:
i. Clean with dry nitrogen, blowing out the permanent air filter ii. Wipe down cabinet interior, check for proper electrical ground iii. Check with Triac for voltage leakage, tighten connections, and check and reset any alarms (replace/repair parts when necessary) m) Inspect all wiring for chafing, burning, and deteriorated insulation n) Record overall condition of equipment
o) Check heat and cooling coils for cleanliness and clean if needed E. Residential Refrigerant Type A/C Units, Heat Pumps
• Check economizer operation
• Check compressor crankcase heater(s)
• Record:
i. Compressor voltage
ii. Compressor amperage
iii. Operating suction pressure
iv. Operating head pressure
v. Operating superheat
vi. Operating oil level
vii. Operating oil pressure
1. Check unloader function, if applicable
2. Check hot gas bypass function, if applicable
3. Check all controls for proper function and set points
4. Check and record discharge air temperature
5. Record overall condition of equipment
F. Forced Hot Air Heaters, Gas
a) Check combustion controls
b) Check room air intake system
c) Check contacts
d) Check mercury bulbs
e) Inspect all wiring for chafing, burning, and deteriorated insulation f) Clean internal surfaces, if necessary
g) Clean external surfaces
h) Clean burner assembly, if necessary
i) Clean fireside
j) Clean flue
k) Inspect refractory
l) Prepare heater for winter conditions
m) Do efficiency test and record
n) Log heater condition at departure
G. Controls – Temperature, Humidity HVAC Sensors
a) Check alarms
184
18 b) Check the operation of all controls, thermostats, starters, relays, pressure switches, disconnect switches and fuses
c) Perform programming adjustments where needed
d) Clean where needed
e) Check for any overrides
f) Check set points, make adjustments where needed
g) Check contacts and relays, clean and tighten contact where necessary h) Check thermostats, calibrate if necessary
i) Check sensors and adjust if necessary
H. Chillers and Boilers
a) Visual inspections of:
i. Fan assemblies
ii. Belts and sheaves
iii. Motor mounts and vibration pads
iv. Electrical connections and contactors
v. Heating and cooling coils
vi. Filter media and racks
vii. Sign glass condition
viii. Bearings
ix. Spray nozzles and pans
x. Igniter and flame assembly
xi. Heat exchanger
xii. Compressor sections
xiii. Condensing sections
xiv. Heating sections
xv. Humidifiers and strainers
xvi. Seals and packing
xvii. Condensate drains and pans
xviii. Flame composition
b) Physical check and/or test of components including but not limited to:
i. Lubrication requirements
ii. Oil sump, heaters, and temperatures
iii. Starter operations
iv. Water flows
v. Alignment on couplings
vi. Motor operating conditions
vii. Suction and discharge pressures
viii. Flow switch operations
ix. Control interlocks
x. Flue stack assembly
xi. Damper operations
xii. External interlocks
xiii. Motor voltage and amperage
xiv. Refrigerant charges
xv. System(s) leaks
xvi. Oil and fluid levels
xvii. Pressure and temperatures
185
19 xviii. Outside air intakes
xix. Refrigerant pump down
c) Perform air filter replacements provided by the Contractor I. Raypak Boilers
a) Replace air filters
b) Replace the hot surface igniter and flame rod if necessary c) Inspect the gas pressure, combustion pressure, flue, and operating controls d) Calibrate temperature sensors
e) Perform operating check and log performance data
f) Observe operation of related pumps
g) Take external bearing temperature readings with laser thermometer, grease bearings
J. Screw Chillers
Water-cooled Trane RTCH Chiller annual to include but not limited to the following:
a) Mega-Ohm (megger) readings of the main compressor motor b) Contractor to conduct an EPA refrigerant leak check and audit per California State Law, AB32
c) Condenser tube brushing
d) Oil filter replacement and oil sample for laboratory Spectro analysis and report
e) Check operation of oil heater, controls, and safeties f) Calibrate temperature and pressure sensors
g) Perform operating check and log performance data
h) Check and record approach in both evaporator and condenser i) Observe operation of related pumps
j) Take external bearing temperature readings with laser thermometer, grease bearings as needed
K. Air Cooled Chiller
Air-cooled Carrier 30RAN Chiller annual to include but not limited to the following:
a) Mega-Ohm (megger) readings of the compressor motors
b) Contractor to conduct an EPA refrigerant leak check and audit per California Law, AB32
c) Condenser tube brushing
d) Check operation of the oil heaters, controls, and safeties e) Calibrate temperature and pressure sensors
f) Perform operating check and log performance data
g) Check and record approach in both evaporator and condenser h) Observe operation of related pumps
i) Take external bearing temperature readings with laser thermometer, grease bearings as needed
j) Wash condenser coils with water and an EPA approved coil cleaner L. Cooling Tower
186
20 a) Basin cleaning
b) Tower strainer cleaning
c) Float assembly adjustment
d) Inspection of make-up water system
e) Check fan belt, adjust and replace if needed. Contractor to provide matched drive belts, inspect and grease bearings
f) Remove debris from tower basin and remove from site for proper disposal M. Smardt Turbocor Air Cooled Chiller (Police Department) a) Check for visible mechanical damage to compressor
b) Check for excessive vibration from other rotating equipment c) Connect to the compressor using the Service Monitoring Tools software and download fault and event logs. Review and save logs for future reference d) Check main power supply voltages
e) Check for signs of hotspots/discoloration on power cables f) Check amperages as per design
g) Check DC bus voltage
h) Check capacitor mid bus voltage
i) Check all communication cables are secure and tight
j) Check all electronic modules are secure
k) Check physical condition of all exposed printed circuit boards (PCBs) l) Check system refrigeration charge
m) Check system and motor cooling liquid line to ensure sufficient sub-cooling n) Verify discharge check valve operation
o) Check airflow is not obstructed
p) Check fin surfaces are clean
q) Check fan rotation (direction)
r) Annual service to include:
i. Contractor to conduct an EPA refrigerant leak check and audit per California State Law AB32
ii. Check electrical terminals are tight
iii. Check operation of all system safety devices and interlocks iv. Check for oil in the system (compressor must operate in an oil-free environment)
v. Check all exposed PCBs for dust build-up and clean if necessary vi. Check calibration of pressure/temperature sensors
vii. Check operation of IGV assembly
viii. Check superheat level/control, if applicable
ix. Check EXV winding resistance
x. Check fan motor overload devices
xi. Perform moisture-prevention measures
xii. Clean condenser coils with water and an EPA approved coil cleaner xiii. Check fan blades for tightness on shaft
xiv. Check fans for loose rivets and cracks
xv. Check coil fins for damage
xvi. Check and record approach in both evaporator and condenser for each circuit
xvii. Take external bearing temperature readings with laser thermometer 187
21 xviii. Observe operation of related pumps
xix. Check bladder-type expansion tanks for proper air pressure, adjust as required
N. Ajax Boilers (Police Department)
a) Test operating and temperature controls
b) Observe noise level
c) Check for water leaks and lockout codes
d) Test operating control
e) Check pilot/main flame signal using a voltmeter
f) Inspect and clean air filter
g) Observe condition of main flame
h) Annual service to include:
i. Lubricate pilot blower
ii. Check the burner
iii. Clean the coils
iv. Clean gas inlet screen
v. Examine vent system
vi. Examine connections
vii. Check for corrosion
viii. Test for gas leaks
ix. Perform a pilot spark test (every 6 mo.)
x. Perform combustion test (check CO, CO2, excess air, nox, and combustion chamber pressure)
xi. Calibrate temperature sensors, perform operating check and log performance data
xii. Observe operation of related pumps
xiii. Check bladder-type expansion tanks for proper air pressure, adjust as required
O. Chilled Water Air Handling Units, except the firing range units (Police Department) a) Inspect the air handling units for operation
b) Check supply and return fan motors for proper operation c) Check unit for abnormal vibration or broken supports d) Check wiring for burnt or chafed conductors
e) Check belts, bearings, and sheaves for wear, damage, and alignment f) Check contactors and relays for pitting, wear, and damage g) Check heating and cooling coils for leaks, lint, and dirt condition h) Check and clean coil drain pans
i) Check and adjust air dampers (outside, mixed, and return) j) Replace all air filters (Contractor to provide filters) k) Check air filter housing integrity
l) Check P-trap, prime as needed to ensure proper operation m) Check drive alignment, wear, seating, and operation
n) Annual service to include:
i. Wash cooling coil
ii. Perform and log full load performance check
iii. Meg-Ohm (check motors [20Hp and greater] log values) iv. Disassemble and clean magnetic motor starters
188
22 v. Check and tighten electrical connections
vi. Lubricate supply, return fan and motor bearings
vii. Check operation of dampers and actuators
viii. Check integrity of all panels on equipment, replace fasteners as needed
ix. Inspect for evidence of moisture carryover beyond the drain pan from cooling coils
x. Visually inspect exposed ductwork and external piping for insulation and vapor barrier for integrity
xi. Check, make appropriate adjustments and if needed, replace fan belts (Contractor to provide belts)
P. Variable Frequency Drives VFDs (Police Department)
a) Clean cabinet with nitrogen and vacuum
b) Confirm operation of muffin fan
c) Tighten all electrical connections
d) Return unit to normal operation
e) Annual service to include:
i. Clean the permanent air filter
ii. Check for proper electrical ground
iii. Check the Triac for voltage leakage
iv. Tighten connections
v. Check and reset any alarms
Q. Trane Condensing Units (Police Department)
a) Check compressors and fan motors for proper operation b) Check refrigerant tubing for chafing, vibration, or broken supports c) Check wiring for burnt or chafed conductors
d) Check refrigerant system for proper charge and operation e) Check contactors and relays for pitting, wear, and damage f) Annual service to include:
i. Perform leak check
ii. General cleaning and lubrication
iii. Check and tighten electrical connections
iv. Clean condenser coils with water and an EPA approved coil cleaner R. DX Air Handling Units (Police Department)
a) Inspect the air handling units for proper operation
b) Check supply and return fan motors for proper operation c) Check unit for abnormal vibration or broken supports d) Check wiring for burnt or chafed conductors
e) Check belts, bearings, and sheaves for wear, damage, and alignment f) Check contactors and relays for pitting, wear, and damage g) Check heating and cooling coils for leaks, lint, and dirt condition h) Check and clean coil drain pans
i) Check and adjust air dampers (outside, mixed, and return) j) Replace all air filters (Contractor to provide filters) k) Check air filter housing integrity
189
23 l) Check P-trap, prime as needed to ensure proper operation m) Check drive alignment, wear, seating, and operation
n) Annual service to include:
i. Wash cooling coil
ii. Perform and log load performance check
iii. Meg-Ohm (check motors [20Hp and greater] log values) iv. Disassemble and clean magnetic motor starters
v. Check and tighten electrical connections
vi. Lubricate supply, return fan and motor bearings
vii. Check operation of dampers and actuators
viii. Check integrity of all panels on equipment, replace fasteners as needed
ix. Inspect for evidence of moisture carryover beyond the drain pan from cooling coils
x. Visually inspect exposed ductwork and external piping for insulation and vapor barrier for integrity
xi. Check, make appropriate adjustments and if needed, replace fan belts (Contractor to provide belts)
xii. Inspect/replace hot and cold water line actuators when necessary Note: City is responsible for the monthly chilled water treatment for the chiller.
6. Biannual Maintenance - Indoor and Outdoor Coil cleaning is to be completed on a bi-annual basis (twice per year), regularly scheduled in April and October, unless otherwise specified by the Facility Maintenance Supervisor or Authorized City Representative.
7. Annual Maintenance – Contractor will perform scheduled annual preventative maintenance in accordance equipment manufacturer’s instructions and recommendations, with a program of standard routines as determined by your experience, equipment application, and equipment operating hours and location. This service is designed to optimize the reliability and efficiency of the equipment, extend the useful life of the City’s equipment, and provide proactive indications of excessive wear and damage to HVAC systems before a catastrophic failure occurs during the next operating season.
8. Contractor will troubleshoot and/or diagnose HVAC/Mechanical problems and recommend emergency or routine repair programs as required. Contractor will also provide recommendations for additional service(s) that will better enhance equipment performance.
Annual maintenance and repairs will be performed on an hourly basis under the On-call HVAC Services portion of the Agreement. Services include, but not limited to:
A. Eddy Current Testing - Contractor will perform non-destructive eddy current tests on the chiller equipment listed. Testing will be conducted on the condenser and evaporator tub bundles every other year, with the first test completed within six (6) months of the Agreement being executed and every other year thereafter. A report will be submitted on each piece of equipment tested identifying the procedures used to test the equipment, the equipment, calibration methods, test results with description of any abnormal conditions that may exist, recommendations and photographs of the equipment, tubes and tube sheets.
190
24 B. Oil Analysis - Contractor will perform oil analysis on equipment listed. Testing will be conducted every other year, with the first test completed within six (6) months of the Agreement being executed and every other year thereafter. A report will be submitted on sample tested identifying the test date, chiller location, manufacturer, model system, serial number, oil type, and oil information, test results with description of any abnormal conditions that may exist and recommendations.
C. Vibration Analysis - Contractor will perform vibration analysis on equipment listed.
Testing will be conducted every other year, with the first test completed within six (6) months of the Agreement being executed and every other year thereafter. A report will be submitted on each piece of equipment tested identifying the procedures used to test the equipment, the equipment, calibration methods, and test results with description of any abnormal conditions that may exist, recommendations and photographs of the equipment.
9. Building Automation Services – Quarterly services will be provided by the Contractor starting within two weeks of contract award or per the discretion of the City Facility Supervisor. Building automated services will be provided at the following locations:
• City Hall: 13220 Central Ave.
• Police Department: 5450 Guardian Way
Contractor is to conduct a complete inspection, improve equipment operations, increase energy efficiency and other necessary services to reduce or eliminate all premature equipment failure or downtime per the list below:
• Clean control panels and verify the ambient temperature within the panels is not extreme.
• Verify electrical connections in the panels are secure and not loose. • Check and verify that all controllers are online and their programs are intact and are running properly.
• Maintain the system graphical displays and make changes as facilities personnel require.
• Perform software maintenance, file maintenance and database backups (on-site and remote).
• Check and remove conditions or situations that reduce system optimization. • Review historical logs to determine control effectiveness and efficiency. • Field sensor (temperature, humidity, pressure, flow, etc.) accuracy verification and calibration based on spot checks.
• Perform hardware communication tests to determine functional verifications of proper and consistent digital communication.
• Evaluate program control loops and implement modifications and tuning in an effort to enhance system performance.
• Provide supplemental training for system users and operators on an as needed basis.
• Address issues and problems discovered by the City between visits that have been recorded in an on-site trouble log.
• Implement free software system upgrades when these upgrades are released by the manufacture.
• Verify the following:
191
25 • Proper operation of dampers.
• Proper operations of valves.
• Equipment (fan, pump, etc.) variable frequency drive (VFD) operation is working correctly.
• Economizers are not jammed or stuck and exhaust fans are operating correctly. • Make recommendations to City regarding potential modifications of the existing operating hardware and software to enhance performance and increase efficiency.
Provide the City with a cost for any upgrades. Upon approval, the City will issue a separate purchase order for the upgrade.
• Inform the City of any control system hardware or software upgrades which may be beneficial to the system operation.
• Provide a equipment performance report which is to be submitted to the City after each preventative maintenance visit.
III. ON-CALL HVAC SERVICES
On-call Non-Emergency and Emergency HVAC Service calls shall be performed on a 24-hour, 7- day- a-week basis, and unrelated to preventative maintenance activities. The on-call services bid item will provide qualified manpower and equipment on an hourly basis to perform routine HVAC/Mechanical repairs or replacements that do not fall under the description of Preventative Maintenance.
1. On-call non-emergency HVAC service calls: When notified, the Contractor will respond by telephone within thirty (30) minutes after the request is placed. At the discretion of the Facility Maintenance Supervisor, the Contractor shall physically respond to repair calls during normal business hours (Monday – Friday, 6:00 a.m. – 6:00 p.m.) within four (4) hours of receiving the call. Repair calls that occur between 6:00 p.m. through 6:00 a.m., or on weekends and holidays, will be billed at the appropriate premium time rate differential. The Contractor has to provide a written estimate for non-emergency service calls within two (2) days and begin repair work within five (5) days of the original request if the proposed repairs are approved.
A. The Parks and Facilities Manager will authorize all non-emergency work. The Contractor will provide written “not-to-exceed” estimates on all non-emergency work. The estimate will include the number of hours, hourly rate, number and type of employees required, estimated material cost and completion date.
B. It will be the Contractor’s responsibility to ensure they have all information to prepare accurate estimates, at no additional cost to the City.
C. Work will only be performed with the City’s written authorization within the time agreed upon between the City and the Contractor. Upon authorization, actual work will not exceed the Contractor’s estimate. Unreasonable estimates will be deemed cause to terminate this contract.
2. Emergency HVAC Service Calls: When notified, the contractor will respond by telephone within thirty (30) minutes and provide service at the affected site within two (2) hours after the request is placed. The Contractor shall provide a twenty-four (24) hour emergency phone number. The City reserves the right to contract with any vendor in the case of an emergency if no response or untimely response has been made by the contractor. The Parks and Facilities Manager will authorize all emergency work.
192
26 IV. INITIAL SERVICES
1. First Preventative Maintenance Visit: The Contractor shall make arrangements with the Facility Maintenance Supervisor, once the contract is awarded, to perform the Preventative Maintenance seasonal service visit necessary for the current time of the year, within four weeks of the contract documents being completed. The Contractor shall then provide a preventative maintenance and inspections program covering all City HVAC equipment to the Maintenance Supervisor, within ten (10) calendar days of the first service visit. The remaining quarterly visits shall then be scheduled as listed herein or as determined by both parties.
2. First Preventative Maintenance Visit Inventory: The first service for each unit will include confirmation, in writing, of each unit’s location, type, model number, serial number, size and filter.
The Contractor shall manually write-in any updates/changes needed for the HVAC Equipment Inventory and submit it to the Facility Maintenance Supervisor within four (4) months from the contract being executed. Contractor shall submit updated inventory list to the Facility Maintenance Supervisor annually at the beginning of the contract year.
3. Annual Audit: At the request of the Facility Maintenance Supervisor, Contractor to provide a detailed audit of the condition of equipment and provide recommendations.
V. NOTIFICATIONS
The Contractor will notify at least one City representative in the order listed below for impacts to each related activity, a minimum of forty-eight (48) hours before start of any maintenance service.
Martin Soto Facility Maintenance Supervisor (909) 536-8769 Jeff Benson Parks and Facilities Manager (909) 334-3479 VI. SERVICE HOURS
The Contractor shall be prepared to respond to all requests for service 24 hours per day, 365 days per year including unscheduled or emergency work during the following time periods below. The following service hours shall be the basis for the On-call HVAC Services portion of the Agreement.
1. Business Hours: Shall be work performed between 6:00 AM and 6:00 PM, Monday through Friday, excluding legal holidays,
2. Emergency and After-Hour Services: Refers to services/repairs that must be made to continue the uninterrupted operations of the City during regular business hours requiring a response time outside of standard business hours. Work after hours shall be performed after regular business hours, Saturdays, Sundays, or during any City holiday requiring immediate response for any emergency situations that arise.
3. Hours outside the designated regular business hours will be allowed by the City if deemed necessary and approved in advance and in writing by the City's designated representative.
4. Work performed in excess of regular work hours or on weekends or holidays shall be based on the appropriate premium time rate differential. Contractor shall submit a total hourly and rate price for labor that includes, but not be limited to, all costs for labor, overhead charges, travel, and payroll expenses.
193
27 A. Contractor shall try to complete work during the service call in order to prevent follow up work. If follow up work is required to correct recent work, including improper repairs, installation, or substandard parts, the City shall not be charged.
B. If a job cannot be completed during regular business hours and the Contractor can make a temporary repair, the Contractor will be allowed to finish the repair during regular business hours.
VII. RESPONSE TIME
All planned service under this Agreement will be performed during the City’s regular business hours from 6:00 AM to 6:00 PM, Monday to Friday.
1. Preventative Maintenance Service Visits: The Contractor shall notify the Facility Maintenance Supervisor a minimum of 48 hours prior to appearing onsite for a preventative maintenance service. Routine services shall be performed from 6:00 AM to 6:00 PM Monday through Friday.
2. The City expects the Contractor to give “priority” service to any call for repairs in the City.
Contractors responding to this bid must be able to provide service within the times noted herein 24 hours a day, 7 days a week, 365 days a year, including holidays for the duration of this contract.
3. The Contractor must regularly report to the Facility Maintenance Supervisor to keep the City informed of the status of work being performed. Time shall be based on actual time spent on the job site(s). Travel charges to the job site will not be allowed. Lunch break time periods will also not be allowed to be charged.
VIII. TOOLS AND EQUIPMENT
The Contractor shall furnish and maintain all equipment necessary for properly maintaining HVAC systems in City facilities. The City reserves the right to inspect equipment to be used to perform services under this contract. Any equipment determined to be in poor condition must be replaced immediately, at the Contractor’s expense. Failure to provide suitable equipment for carrying out all requirements of this contract may be grounds for termination.
At the request of the City, the Contractor must be able to provide rental equipment if necessary while repairs or replacements are being made.
IX. SERVICE TAG
All technicians shall complete a service tag/sticker and attach it to the serviced equipment after completion of work. The service tag/sticker shall be used to document the following information: the date serviced, the name of the technician(s), and a description of the service(s) performed. The service tag/sticker must contain adequate space to document future repairs and must be placed in a location to prevent weather related damages. The technician shall not place the new service tag over pre-existing service tags, including tags that have previous history and repairs.
X. WARRANTY SERVICE
Contractor material and workmanship guarantee for one (1) year after acceptance. Where parts or material becomes defective during this warranty period, the Contractor shall notify the City so that the warranty may be exercised. The Contractor shall be responsible for exercising maintenance and replacement covered by the warranty.
194
28 XI. PAYMENT
All payments will be made within thirty (30) days after an invoice has been approved for payment by the City’s designated representative. Copies of all invoices for supplies, materials, and installed equipment should be included with the sent invoice. For cost accounting purposes, the invoice should be emailed to the City’s accounts payable at [email protected].
XII. WAGES PAID TO CONTRACTOR’S WORKERS
Pursuant to California Labor Code Article 2, Wages, Section 1770 et seq., the work described herein is a “public work” as defined by this Article of the Labor Code and requires payment of prevailing wages pursuant to Labor Code Section 1771. Contractors are advised to familiarize themselves with this provision and with Department of Industrial Relations opinions and interpretations relative to HVAC maintenance. Failure to comply with Labor Code 2, Wages, of the Labor Code may result in imposition of statutory penalties enumerated in Labor Code Section 1775.
XIII. CONTRACT PERIOD, RENEWAL, AND PRICE ADJUSTMENTS
The facilities HVAC contract will be for three (3) years. This contract may be extended by the City for additional two (2) years after the initial contract period. Before the contract renewal period, the maximum total hourly rate increase for that contract period may be increased up to 5% from the preceding term based on approval by the City. The City in its discretion may base increases in the contract price on relevant fluctuations in the Construction Price Index (“CPI”) for the Riverside-San Bernardino-Ontario metropolitan area.
XIV. INVENTORY LIST
LOCATION ADDRESS TYPE/ITEM DESCRIPTION MANUFACTURER MODEL NUMBER CITY HALL SALLY PORT 13250 Central Ave BOILER RYPAK H7-2004 CITY HALL SALLY PORT 13250 Central Ave CHILLER TRANE
RTHC1B1F0H0B1LFVQU
CD
CITY HALL SALLY PORT 13250 Central Ave CHILLER CARRIER 30HXC186R--640-- CITY HALL ROOF TOP 13220 Central Ave CHILLER CARRIER 30RAN015---511PT CITY HALL ROOF TOP 13220 Central Ave AIR HANDLER MCQUAY RDS800BY CITY HALL ROOF TOP 13220 Central Ave AIR HANDLER MCQUAY RDS800BY CITY HALL COUNCIL CHAMBERS 13220 Central Ave AIR HANDLER TRANE 4YCC4036A1070AB CITY HALL COUNCIL CHAMBERS 13220 Central Ave AIR HANDLER TRANE 4YCC4036A1070AB CITY HALL BASEMENT 13220 Central Ave AIR HANDLER YORK 39MN08B00561N11XXS NAC 5201 D. St. PACKAGED GAS/ELECTRIC CARRIER 48HJD006
NAC 5201 D. St. PACKAGED GAS/ELECTRIC CARRIER 48HJD006
NAC 5201 D. St. PACKAGED GAS/ELECTRIC CARRIER 48HJD006
NAC 5201 D. St. PACKAGED GAS/ELECTRIC CARRIER 48HJD012
NAC 5201 D. St. PACKAGED GAS/ELECTRIC CARRIER 48HJD025
CHILDREN'S YOUTH MUSEUM 13191 6th St.. PACKAGED GAS/ELECTRIC CARRIER 48HJD006--531-- CHILDREN'S YOUTH MUSEUM 13191 6th St.. PACKAGED GAS/ELECTRIC CARRIER 48HJD006--531-- 195
29 CHILDREN'S YOUTH MUSEUM 13191 6th St.. PACKAGED GAS/ELECTRIC CARRIER 48HJD006--531-- CHILDREN'S YOUTH MUSEUM 13191 6th St.. PACKAGED GAS/ELECTRIC CARRIER 48HJD006--531-- LIBARAY 13180 Central Ave. BOILER RYPAK H3-HD401
LIBRARY 13123 libaray Ra. CHILLER CARRIER 30RAP0405JC4DF10 LIBRARY 13180 Central Ave. AIR HANDLER PACE A-30 AF SI
7TH ST THEATER 13123 7th St. PACKAGED GAS/ELECTRIC CARRIER 48GPN024040311 7TH ST THEATER 13123 7th St. PACKAGED GAS/ELECTRIC CARRIER 48GPN024040311 7TH ST THEATER 13123 7th St. PACKAGED GAS/ELECTRIC CARRIER 48GPN024040311 7TH ST THEATER 13123 7th St. PACKAGED HEAT PUMP YORK 50FCQM17A3A5A0A0A0 7TH ST THEATER 13123 7th St. SPLIT SYSTEM HEAT PUMP YORK 38YCC060540/FB4RNF05
0 PUBLIC WORKS ADMIN 5050 Schaefer Ave. PACKAGED GAS/ELECTRIC YORK ZJ090510N2EZZ50001A PUBLIC WORKS ADMIN 5050 Schaefer Ave. PACKAGED HEAT PUMP YORK XP090C00R2A1BAA1A2 PUBLIC WORKS ADMIN 5050 Schaefer Ave. PACKAGED HEAT PUMP YORK B1HX036A06A PUBLIC WORK WAREHOUSE 5050 Schaefer Ave. SPLIT SYSTEM HEAT PUMP YORK CZH02411CA/MC35B3XH
1H
PUBLIC WORK WAREHOUSE 5050 Schaefer Ave. SPLIT SYSTEM HEAT PUMP YORK CZH02411CA/MC35B3XH
1H
PUBLIC WORK WAREHOUSE 5050 Schaefer Ave. SPLIT SYSTEM HEAT PUMP YORK YZH036311B/AM480CT FLEET 5050 Schaefer Ave. COOLER REZNOR RDH350
FLEET 5050 Schaefer Ave. COOLER REZNOR RDH350
COMMUNITY BUILDING 5443 B. St. PACKAGED GAS/ELECTRIC YORK ZJ061S07N2EZZ50001A COMMUNITY BUILDING 5443 B. St. PACKAGED GAS/ELECTRIC YORK ZJ061S07N2EZZ50001A COMMUNITY BUILDING 5443 B. St. PACKAGED GAS/ELECTRIC YORK ZJ061S07N2EZZ50001A COMMUNITY BUILDING 5443 B. St. PACKAGED GAS/ELECTRIC YORK ZJ061S07N2EZZ50001A COMMUNITY BUILDING 5443 B. St. SPLIT SYSTEM HEAT PUMP YORK YHJF24S41S1A COMMUNITY BUILDING 5443 B. St. SPLIT SYSTEM HEAT PUMP YORK YCS36B22SA OLD SCHOOL HOUSE 5493 B. St. SPLIT SYSTEM HEAT PUMP YORK YHE48B21SA/AX480CT OLD SCHOOL HOUSE BARN 5493 B. St. MINI SPLIT SYSTEM SAMSUNG AM048TXMDCH FAMILY SERVICES 13271 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 580BPZ240255AAAV APOC 5575 Edison Ave. SPLIT SYSTEM HEAT PUMP YORK
YHJD60S44S4A/AHX60D
3XH21A
CITY HALL SOUTH 13250 Central Ave. PACKAGED HEAT PUMP YORK B1HH060A25B CITY HALL SOUTH 13250 Central Ave. PACKAGED HEAT PUMP YORK B1HH060A25B CITY HALL SOUTH 13250 Central Ave. AIR HANDLER MCQUAY RDS802BY CITY HALL SOUTH 13250 Central Ave. AIR HANDLER MCQUAY RDS802BY GREY BUILDING 13150 7th St. SPLIT SYSTEM GAS YORK
CZH06011CA/TM9X060B
12MP11A
GREY BUILDING 13150 7th St. SPLIT SYSTEM GAS YORK
CZH06011CA/TM9X060B
12MP11A
196
30 LIBERTY PARK
11860 Telephone
Ave. PACKAGED HEAT PUMP BARD W36H1-AOOVP4
LIBERTY PARK
11860 Telephone
Ave. PACKAGED HEAT PUMP BARD W36H1-AOOVP4
MONTE VISTA PARK
13196 Monte Vista
Ave. SPLIT SYSTEM YORK YCJD60S41S2A
MONTE VISTA PARK
13196 Monte Vista
Ave. PACKAGED HEAT PUMP YORK HA120C00A2AAA1A
SENIOR CENTER 13170 Central Ave. PACKAGED GAS/ELECTRIC YORK ZJO90S10N2EZZ50001A SENIOR CENTER 13170 Central Ave. PACKAGED GAS/ELECTRIC YORK ZJO90S10N2EZZ50001A SENIOR CENTER 13170 Central Ave. PACKAGED GAS/ELECTRIC YORK ZJ061S07N2EZZ50001A SENIOR CENTER 13170 Central Ave. PACKAGED GAS/ELECTRIC YORK ZJ061S07N2EZZ50001A SENIOR CENTER 13170 Central Ave. PACKAGED GAS/ELECTRIC YORK ZJ061507N2EZZ50001A SENIOR CENTER 13170 Central Ave. PACKAGED GAS/ELECTRIC YORK ZJ300S32J2EZZ10001B SENIOR CENTER 13170 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 48HJM004 SENIOR CENTER 13170 Central Ave. MINI SPLIT SYSTEM
MITSUBISHI
ELECTRIC PUZ-836NK37
COCC 13201 Central Ave. CHILLER YORK YCAL0055EC46XDBSDT COCC 13201 Central Ave. BOILER AO SMITH GB0 750 E42N020000 COCC 13201 Central Ave. AIR HANDLER MAGIC AIRE 090-BRW-4-C COCC 13201 Central Ave. AIR HANDLER MAGIC AIRE 60-BR-C
COCC 13201 Central Ave. AIR HANDLER MAGIC AIRE 60-BR-C
COCC 13201 Central Ave. AIR HANDLER MAGIC AIRE 60-BR-C
CHAFFEY/ASSEMBLY BUILDING 13160 7th St. PACKAGED HEAT PUMP YORK WP078C00R4AABAA1A CHAFFEY/TECH CENTER 13170 7th St. PACKAGED GAS/ELECTRIC LENNOX LGA088HH2G CHAFFEY/TECH CENTER 13171 7th St. PACKAGED GAS/ELECTRIC LENNOX LGC072SH1G CHAFFEY/TECH CENTER 13172 7th St. PACKAGED GAS/ELECTRIC LENNOX LGC120SH1G CHAFFEY/TECH CENTER 13173 7th St. PACKAGED GAS/ELECTRIC LENNOX LGC102SH1G CHAFFEY/TECH CENTER 13174 7th St. PACKAGED GAS/ELECTRIC LENNOX LGC150SH1G EPIC BUILDING 13106 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13107 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13108 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13109 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13110 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13111 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13112 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13113 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13114 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 EPIC BUILDING 13115 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50HJQ006- - -501 197
31 EPIC BUILDING 13116 Central Ave. PACKAGED GAS/ELECTRIC CARRIER 50GCQM06A2A5A0A0A0 PD 5450 Guardian Way CHILLER #1 Smardt SAA059-2BG6-2A5V PD 5450 Guardian Way CHILLER #2 Smardt SAA059-2BG6-2A5V PD 5450 Guardian Way BOILER #1 Ajax WCP-2001-N
PD 5450 Guardian Way BOILER #2 Ajax WCP-2001-N
PD 5450 Guardian Way SPLIT SYSTEM Trane TWE240E40TAA
PD 5450 Guardian Way SPLIT SYSTEM Trane TTA240E40TAA
PD 5450 Guardian Way SPLIT SYSTEM Trane 4TEC3F60B1000AA PD 5450 Guardian Way SPLIT SYSTEM Trane 4TWA3060A4000BB PD 5450 Guardian Way AIR HANDLER Trane CSAA010UAC00
PD 5450 Guardian Way AIR HANDLER Trane 174F7603/ X13170900230 PD 5450 Guardian Way AIR HANDLER Trane 174F7608/ X13170900270 PD 5450 Guardian Way AIR HANDLER Trane CSAA010UAC00
PD 5450 Guardian Way AIR HANDLER Trane 174F7599/ X13170900190 PD 5450 Guardian Way AIR HANDLER Trane 174F7608/ X13170900270 PD 5450 Guardian Way AIR HANDLER Trane CSAA021UAC00
PD 5450 Guardian Way AIR HANDLER Trane 174F7608/ X13170900270 PD 5450 Guardian Way AIR HANDLER Trane
177U0802/
X13170900301
PD 5450 Guardian Way AIR HANDLER Trane CSAA010UACOO
PD 5450 Guardian Way AIR HANDLER Trane 174F7603/ X13170900230 PD 5450 Guardian Way AIR HANDLER Trane 174F7608/ X13170900270 PD 5450 Guardian Way AIR HANDLER Trane CSAA010UAC00
PD 5450 Guardian Way AIR HANDLER Trane 174F7603/ X13170900230 PD 5450 Guardian Way AIR HANDLER Trane 174F7608/ X13170900270 PD 5450 Guardian Way AIR HANDLER Trane CSAA003UAC00
PD 5450 Guardian Way AIR HANDLER Trane 174F7595/ X13170900150 PD 5450 Guardian Way AIR HANDLER Trane 174F7599/ X13170900190 PD 5450 Guardian Way AIR HANDLER Trane CSAA006UAC00
PD 5450 Guardian Way AIR HANDLER Trane 174F7599/ X13170900190 PD 5450 Guardian Way AIR HANDLER Trane 174F7603/ X13170900230 PD 5450 Guardian Way AHU RANGE SUPPLY Team Air CAH21600S PD 5450 Guardian Way AIR HANDLER Trane CSAA014UAC00
PD 5450 Guardian Way AIR HANDLER Trane 174F7608/ X13170900270 PD 5450 Guardian Way AIR HANDLER Trane 174F7608/ X13170900270 198
32 PD 5450 Guardian Way AIR HANDLER Trane CSAA017UAC00
PD 5450 Guardian Way AHU RANGE EXHAUST Team Air CAH28500S 199
33 Signature of President, Secretary, Partner, Owner or Authorized Representative Date
ATTACHMENT A
Conflict of Interest Statement
Provide in this section a statement disclosing any past, ongoing or potential conflict of interest that your firm, proposed staff, or any subcontractors may have as a result of performing this work. If there is no conflict of interest, then state “None.”
If there is a real or perceived conflict of interest that exists with the submission of a proposal, or would exist if the Proposer entered into an Agreement with the City of Chino in this proposal, full details should be provided in this section. Detail a plan to manage the conflict of interest.
Acknowledgement of Insurance Requirements
I, (Printed Name), the (Title)
of (Company Name), certify that the Insurance Requirements set forth in the Proposed Agreement for this RFP have been read and understood. I certify that (Company Name) (is/are) able to provide the coverages specified.
Exemptions to RFP
Proposers shall make a commitment to accept the terms and conditions in the RFP and Professional Services Agreement, including acknowledgement of receipt of all amendments and/or addenda to the RFP. Any requests for exceptions to the terms of the RFP and Professional Services Agreement (Attachment B) must be noted and submitted in a separate sheet marked “EXCEPTIONS TO RFP.” City Attorney will review any exceptions submitted. 200
City of Chino Purchasing Division
PRESENTED TO:
Nick Tickenoff
PRESENTED BY:
C.E. MECHANICAL, INC. 13327 ELLIOT AVE CHINO CA 91710 CSLB #: 765670 Citywide HVAC Preventative
Maintenance and Repairs
AUGUST 2025
City of Chino
RFP#2025-0015A
Contract Documents
201
Subject: Proposal Submission - RFP #2025-0015 Citywide HVAC Preventative Maintenance and Repairs
To the City of Chino Evaluation Committee:
On behalf of C.E. Mechanical, Inc., we are pleased to submit this proposal in response to the City of Chino’s Request for Proposals No. 2025-0015A. We appreciate the opportunity to support the City's municipal facilities with professional, reliable, and fully code-compliant HVAC maintenance and emergency services.
As a Chino-based contractor operating from our office at 13327 Elliot Avenue, we take pride in supporting our community with responsive service, strong local presence, and an unwavering commitment to safety, sustainability, and performance. C.E. Mechanical, Inc. is a fully licensed, bonded, and DIR-registered California mechanical contractor (CSLB License No. 765670, DIR No. 2000001498) with a 25-year track record of successful execution for public agencies across Southern California.
We acknowledge the City’s need for dependable quarterly maintenance, time-sensitive emergency response, seasonal equipment optimization, and specialized BAS support. Our proposal affirms our readiness to mobilize within 14 calendar days of award and complete initial service within the City’s required window. We maintain 24/7/365 emergency dispatch capacity with guaranteed on-site response within two hours for urgent calls.
This proposal, including all attachments and the separately submitted sealed cost file, shall remain valid for a period of no less than 120 calendar days from the RFP deadline. We confirm that all information is true and correct, and that we take no exceptions to the RFP terms unless explicitly stated in Attachment A. We also affirm that no conflicts of interest exist in connection with this proposal. We also confirm receipt and acknowledge Addendum 1 and 1A.
We thank the Evaluation Committee for this opportunity and look forward to the potential of continuing our service to the City of Chino. Should additional detail or clarification be required, please do not hesitate to contact me directly.
C.E. Mechanical, Inc.
13327 Elliot Ave Chino, CA 91710
Phone: (909) 548-0925
www.cemech.com · [email protected]
Cover Letter
C.E. MECHANICAL, INC. · CSLB #: 765670
City of Chino – Purchasing Division
13220 Central Avenue
Chino, CA 91710
Nick Tickenoff
C.E. Mechanical, Inc.
(909) 230-2113
[email protected]
Nick Tickenof
202
Experience & Qualifications
C.E. MECHANICAL, INC. · CSLB #: 765670
C.E. MECHANICAL, INC.
(A C-20 LICENSED CALIFORNIA CORPORATION)
13327 ELLIOT AVE
CHINO, CA 91710
24/7 Service
Phone: (909) 548-0925
E-Mail: [email protected]
C.E. Mechanical, Inc. is a licensed, bonded, and DIR-registered California mechanical contractor (CSLB License No. 765670, DIR Registration No. 2000001498) headquartered in Chino, California. Our City of Chino Business License number is 24360.
For over 25 years, we have delivered professional, code-compliant HVAC and building automation services throughout Southern California, with a primary focus on serving municipal, institutional, and public agency clients. Our firm has developed a reputation for reliability, responsiveness, and technical excellence across a wide range of mechanical systems, including chillers, boilers, air handlers, pumps, controls, and energy-efficient retrofits.
Our experience spans the full lifecycle of HVAC system management - ranging from preventive maintenance and predictive diagnostics to capital equipment replacement and control system integration. We are familiar with the operational demands of public-sector facilities, including critical environments such as police departments, administrative centers, and community buildings. Our services consistently align with California Title 24 energy efficiency mandates, CALGreen building standards, and South Coast AQMD and CARB environmental compliance requirements.
C.E. Mechanical has proudly supported the City of Chino through multiple mechanical service contracts, including HVAC repairs, emergency callouts, and seasonal maintenance tasks. This longstanding relationship has given us deep familiarity with the City’s equipment inventory, service expectations, and operational protocols. We have also delivered HVAC solutions for other municipalities and public agencies, giving us extensive knowledge of prevailing wage compliance, public works documentation, and California procurement practices. Our technicians are trained in ASHRAE 180 maintenance standards, EPA refrigerant management rules, and Cal/OSHA safety regulations. Field staff maintain current EPA 608 certifications and participate in ongoing manufacturer-specific training for systems including Trane, Carrier, and others.
We maintain deep expertise in optimizing integrated HVAC systems, including air- and water-cooled chillers, high-efficiency boilers, variable-frequency air handlers, rooftop units, split systems, and ductmounted ventilation and filtration equipment. Our team also delivers control system diagnostics and BAS optimization services to ensure alignment with facility schedules, thermal performance targets, and fault detection protocols. Each service is backed by quality assurance procedures and a field-proven workflow that prioritizes energy performance, occupant comfort, and mechanical reliability.
As a Chino-based firm, we are uniquely positioned to respond rapidly to service requests, dispatch local technicians, and maintain hands-on oversight from our management team. We are very experienced working in occupied and sensitive civic environments and have coordinated closely with City staff to avoid disruptions, maintain safety, and ensure transparent communication.
C.E. Mechanical’s combination of local experience, technical strength, and public agency familiarity enables us to meet the performance and reliability standards required under RFP #2025-0015A. We are fully prepared to support the City of Chino’s infrastructure with trusted, compliant, and sustainable mechanical services.
203
Project Team Qualifications
C.E. MECHANICAL, INC. · CSLB #: 765670
NICK TICKENOFF
CONSTRUCTION MANAGER
[email protected]
(909) 230-2113
With over a decade of experience experience,
Nick is a Local 250 JJATC graduate (2010-
2015) and Leon Maxwell Award winner. He
specializes in diagnosing and resolving
equipment issues, reverse engineering
problematic systems, and leading projects
from package unit change-outs (1-100 tons) to
central plant installations. His expertise spans
package unit maintenance, cooling tower
overhauls (25-500 tons), and system retrofits.
MIGUEL GUTIERREZ
SERVICE TECHNICIAN
[email protected]
(909) 261-2136
Miguel has been with C.E. Mechanical for 6 years
and is a reliable and trusted service technician. He
has worked on City of Chino and Riverside County
maintenance projects/scopes previously. His
expertise in HVAC equipment will be vital for the
routine procedures required by the RFP.
BRYAN WAKEFIELD
LEAD FIELD PERSONNEL
[email protected]
(562) 394-3515
Bryan brings over seven years of hands-on HVAC
experience, with substantial involvement in
municipal projects for the City of Chino, City and
County of Riverside, and Los Angeles County. He
has developed comprehensive knowledge of
complex mechanical systems, including chillers,
building automation controls, and integrated
HVAC networks. Bryan holds certifications in
Turbocor and Trane overhaul procedures, as well
as LG and Mitsubishi VRF systems.
JEFF LAKSO
LEAD FIELD PERSONNEL
[email protected]
(909) 270-6409
Jeff brings 26 years of experience in HVAC service
and electrical work, specializing in compressors,
dryers, package units of various tonnages, builtup systems, chillers, comfort cooling, process cooling, and retrofits. He has been a valuable part
of C.E. Mechanical, Inc. for the past three years.
All proposed primary technicians and supervisory personnel are based out of our central office at 13327 Elliot Avenue, Chino, CA 91710, and reside locally to ensure rapid response to all service and emergency calls. Our team is available 24 hours a day, 7 days a week, and is fully capable of meeting the City’s specified two-hour emergency response requirement. Each team member is experienced in supporting public-sector facilities and possesses the technical qualifications required to service the City’s diverse HVAC inventory, including chillers, boilers, BAS-integrated systems, and packaged units. Detailed resumes and references for staff are available upon request.
ASSIGNED EMPLOYEES DESIGNATION PROJECT ROLE
Jeff Lakso Lead Field Personnel Primary HVAC Mechanic
Bryan Wakefield Lead Field Personnel Primary HVAC Mechanic Miguel Gutierrez Service Technician Secondary HVAC Mechanic Nick Tickenoff Construction Manager Supervisor
Apprentice Technicians (to be assigned) Service Technician General Low-Level Maintenance 204
Project Understanding
C.E. Mechanical, Inc. understands that the City of Chino seeks a qualified mechanical contractor to deliver comprehensive, proactive HVAC preventative maintenance and on-call repair services across its public facilities. We recognize that this assignment is essential to supporting occupant comfort, energy efficiency, and uninterrupted operations across a diverse portfolio of City buildings. The RFP’s scope - including quarterly preventative maintenance, biannual and annual specialized services, emergency response, and building automation support - requires a structured, accountable, and responsive program executed by experienced professionals.
Our approach combines field-tested maintenance procedures with smart scheduling, performance reporting, and technician continuity. We tailor each task to the specific equipment type, manufacturer guidelines, operational schedules, and code compliance requirements of the facility. Our service delivery model is built around four key principles: preventive action, operational transparency, systems optimization, and regulatory alignment.
We fully understand that the City’s HVAC inventory includes a range of packaged rooftop units, split systems chillers, boilers, air handling units, and specialized equipment such as Smardt Turbocor chillers and integrated BAS platforms. These systems operate across police, administrative, and civic buildings with varying levels of criticality, occupancy schedules, and equipment access challenges.
The RFP specifies quarterly HVAC preventative maintenance at all covered facilities, with additional biannual coil cleaning, annual belt replacement, and emergency response with a twohour arrival commitment. Building automation system inspections and adjustments are required quarterly at City Hall and the Police Department. Also included are specialized services such as oil analysis, vibration testing, and eddy current tube inspections for chiller systems.
C.E. Mechanical is fully prepared to fulfill all required tasks while maintaining detailed records, minimizing service interruptions, and proactively identifying issues that may impact performance or compliance. Our internal protocols exceed ASHRAE 180 and EPA 608 standards and incorporate manufacturer-specific PM schedules and reporting methods.
Preventive Maintenance Strategy
Each quarterly preventative maintenance visit follows a structured, equipment-specific checklist based on ASHRAE 180-2018 standards and OEM maintenance protocols. Our technicians begin with a complete visual and mechanical inspection of HVAC system components to identify wear, corrosion, or signs of degradation. Filters are replaced with a minimum MERV-10 rated media (and V-Belt MERV 14 for the Police Station Shooting Range AHU’s), per City specifications, to maintain indoor air quality and protect internal coil surfaces. Belts are inspected, adjusted, and lubricated at each visit, with full replacements performed annually or sooner if wear thresholds are exceeded.
Plan Methodology and
Project Approach
C.E. MECHANICAL, INC. · CSLB #: 765670 205
System performance is verified through refrigerant pressure readings, subcooling evaluations, and delta-T temperature checks across coils and heat exchangers. Technicians record voltage and amp draw measurements for motors, compressors, and fan assemblies to detect imbalance or early-stage failure. Thermostats and local control interfaces are tested for accuracy and functionality.
For City Hall and the Police Department, where building automation systems are in place, our technicians perform point-to-point verification of sensors and outputs, validate alarm functions, and confirm that setpoints and schedules align with occupant usage patterns. All inspection results, readings, and findings are documented electronically and reviewed by a field supervisor prior to submittal to City personnel.
All tasks are recorded digitally using our field service platform, allowing for photo documentation, timestamped task completion, and digital reporting. Work orders are submitted within 48 hours and can be formatted to match City reporting preferences. For chillers, boilers, and central plant equipment, our team performs detailed inspections using temperature delta readings, flow rate analysis, and trending of historical operational data when available. Critical components such as expansion valves, oil levels, condenser cleanliness, and compressor envelope readings are verified and logged.
Emergency Response and Dispatch Protocol
We provide 24/7/365 emergency service with a live dispatcher and technician on call at all times.
Upon receiving an emergency request, our dispatcher verifies access conditions and technician availability and mobilizes a qualified service technician within minutes. All emergency calls are tracked in our internal system and followed by a completed service report within 24 hours.
Because our team is based in Chino, we can meet the RFP’s two-hour on-site response requirement without exception. We also pre-position tools and common spare parts for highpriority facilities such as police and administrative offices to minimize downtime.
Building Automation and Controls Support
Our BAS-qualified technicians perform quarterly inspections of control panels and user interface settings at City Hall and the Police Department. We verify sensor calibration, alarm functionality, time-of-day scheduling, and demand-response logic. Control sequences are adjusted as needed in accordance with Title 24 and occupant schedules. If trend data or occupancy feedback identifies inefficiencies, our team provides recommendations for minor logic edits, setpoint adjustments, or component replacement. For any systems operating on Tridium/Niagara, Carrier i-Vu, or equivalent open platforms, we are capable of performing deeper programming-level diagnostics. Our controls team works under the direction of our field supervisor to align automation system behavior with HVAC equipment health and energy goals.
Plan Methodology and
Project Approach
C.E. MECHANICAL, INC. · CSLB #: 765670 206
Quality Control, Communication, and Reporting
Each preventative maintenance and repair task is logged through our digital service platform, which generates a completed checklist, photographic documentation of equipment and any identified deficiencies, and technician notes on observed conditions or developing trends. Recommendations for corrective actions are clearly noted, and each report includes timestamps and technician credentials.
All PMs are reviewed by a field supervisor prior to submittal, with a running log of completed work maintained by site. We also offer quarterly summary reports to support capital planning and budgeting. Regular coordination meetings with City staff are recommended to review service history, open repair items, and upcoming scheduling needs—ensuring proactive alignment and continuous improvement.
Innovations and Refinements
To enhance system performance and asset planning, C.E. Mechanical provides several refinements beyond the base scope. These include integration with existing BAS platforms to monitor trend data and detect system faults early, and advanced diagnostics for chillers and s based on temperature delta patterns and compressor cycling behavior. We also offer annual condition scorecards to support long-term equipment replacement strategies. Where applicable, we adjust PM schedules based on actual runtime or demand instead of fixed calendar intervals.
These innovations improve reliability, reduce reactive costs, and support the City’s sustainability and operational resilience goals.
C.E. Mechanical, Inc. affirms without exception that we will perform the full scope of services defined in Section F of RFP #2025-0015A. This includes, but is not limited to, quarterly HVAC maintenance; biannual coil cleaning; annual belt replacement; chiller oil analysis, vibration testing, and eddy current inspections; BAS functionality checks at City Hall and the Police Department; and routine service of filters, refrigerant systems, dampers, heat exchangers, and so on. Our emergency team guarantees two-hour on-site response, and all service activities will be documented with photographic verification and technician credentials.
All work will be performed in strict compliance with Title 24, CALGreen, ASHRAE 180, SCAQMD, CARB, and Cal/OSHA requirements. Our pricing fully reflects the scope as written, with no exclusions. Should the City request additional refinements during the contract term, we are prepared to implement them promptly and in full regulatory alignment. C.E. Mechanical is committed to delivering responsive, compliant, and performance-driven HVAC services that meet the City of Chino’s long-term operational goals.
Annual Escalation Clause
Pricing submitted herein shall remain firm for the initial twelve (12) months of the contract term. Thereafter, on an annual basis, pricing may be adjusted to reflect increases in the cost of labor and materials, based on the percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), Los Angeles-Long BeachAnaheim, CA, All Items, as published by the U.S. Bureau of Labor Statistics (BLS).
Any adjustment shall be calculated using the most recent 12-month period available prior to contract renewal, and shall not exceed 3.5% per year unless otherwise approved in writing by the City of Chino.
If the CPI reflects a negative value (deflation), no increase will be granted. The contractor shall provide a written request for any adjustment, including supporting CPI data, no less than 30 days prior to the renewal date. No retroactive pricing changes will be permitted.
Plan Methodology and
Project Approach
C.E. MECHANICAL, INC. · CSLB #: 765670 207
12 F. SCOPE OF SERVICES
Citywide HVAC Preventative Maintenance, Repairs, and Automation Scope of Work/Specifications It shall be the Contractor’s responsibility to develop and implement a routine maintenance program to effectively maintain, to the satisfaction of the City representative, all aspects of HVAC systems in City commercial facilities. For the purpose of this contract, routine preventative HVAC maintenance shall be defined as quarterly scheduled routine inspection and proactive servicing of HVAC systems to facilitate heating/cooling with a minimal downtime. On-call, as-needed services (24 hours, 7 days a week, 365 days per year) will be for unplanned, and/or emergency repair services, as listed herein.
The routine maintenance and all repairs shall be provided in accordance with the highest standards of the industry, skill, workmanship, applicable trade practices, meet warranties and in conformance to all applicable laws, codes, and regulations. The Contractor’s maintenance program and repairs shall, at a minimum, include but not limited to the specifications outlined herein.
Preventative maintenance and repairs described in this Scope of Work are to be performed on the HVAC equipment at the following locations in City of Chino:
1. Chino Police Department – 5450 Guardian Way
2. City Hall – 13220 Central Ave.
3. City Hall South- 13250 Central Ave.
4. Neighborhood Activity Center (NAC) – 5201 D. St.
5. Children’s Youth Museum – 13191 6th St.
6. Chino Branch Library – 13180 Central Ave.
7. Assemblymember Office - 13160 7th St.
8. Gray Building (Chamber of Commerce) – 13150 7th St.
9. 7th Street Theatre – 13123 7th St.
10. Senior Center – 13170 Central Ave.
11. Carolyn Owens Community Center (COCC) – 13201 Central Ave.
12. Family Services – 13271 Central Ave.
13. Community Building – 5443 B. St.
14. Old School House Museum – 5493 B. St.
15. Public Works Services (Yard) - 5050 Schaefer Ave.
16. Ayala Park Operation Center (APOC) – 5575 Edison Ave.
17. Monte Vista Park – 13196 Monte Vista Ave.
18. Liberty Park – 11860 Telephone Ave.
19. Chino Champion – 13179/13191 9th St.
20. Chaffey Tech Center - 13170 7th St, Chino, CA 91710
21. EPIC Building - 13106 Central Ave, Chino, CA 91710
I. SERVICE SPECIFICATIONS
Preventative maintenance will include any and all costs for providing the necessary labor, tools, travel, equipment, mobilization/demobilization, licenses and incidental materials such as fluids, belts and filters, etc. per the Preventative Maintenance lists below to test, maintain, and diagnose the specified HVAC equipment, including but not limited to air flow analysis, water flow, delta T, humidity, Freon and electronic conditions.
Preventative Maintenance activities shall also specifically include but not limited to the following:
208
13 1. Test and Inspection – All labor to visually inspect and search for worn, failed and/or doubtful parts.
Visually check coil surfaces, fan blades, fan belts, couplings, equipment housings, motor mounts, dampers, valves, fluid levels, VAV boxes, heat exchangers, etc. Make recommendations to the City of any necessary replacements and/or adjustments.
2. Preventative Maintenance and Predictive Maintenance – Labor to perform preventative maintenance on the equipment included. Maintenance intervals for systems and equipment are determined by run time, system use, application, location, and manufacturer’s recommendations.
3. Consumable Materials – Normal consumable materials and supplies, such as lubricants, grease, towels/rags, wire nuts, cleaning solutions, oil and clean-up materials.
4. Air Filter Media and Service – Includes regular air filter changing per the manufacturer’s specifications. Includes monitoring of air filter conditions. Should additional changes be required, Air Filter Media and Service includes notifying the City of any recommended adjustments to the maintenance program.
5. Coil Service – Two (2) Semi-annual cleaning of each condenser coil during the contract year and or per manufacture’s recommendations. Should additional cleaning be required, Coil Service includes notifying the City of any necessary adjustments to this program.
6. Belt Service – This agreement will include one (1) annual belt change for each belt in the system at the beginning of the contract year or per the manufacture’s recommendations. Should additional belt changes be required, Belt Service includes notifying the City of any necessary adjustments to this program. Contractor to provide all belts.
II. PREVENTATIVE MAINTENANCE
Quarterly Service Activities: Along with Preventative Maintenance Regularly Scheduled Activities (see section below), the Quarterly Service Activities will be the City’s primary maintenance program normally scheduled during the month of July, October, January, and April unless otherwise specified by the Maintenance Supervisor or Authorized City Representative.
1. Spring Inspection/Service: The Contractor shall schedule and perform a pre-cooling season maintenance service call. The following services shall be performed in addition to Preventative Maintenance Regularly Scheduled Activities.
A. Cycle units and check pressures and refrigerant charge B. Ensure condensate lines are clean and pump is working properly C. Visually inspect all wiring
D. Check and clean the indoor and outdoor coil if needed E. Replace filters, inspect belts, replace as needed
2. Summer Inspection/Service: The Contractor shall schedule and perform the following in addition to Preventative Maintenance Regularly Scheduled Activities:
A. Replace filters, inspect belts, replace as needed
B. Visually inspect all wiring
209
14 3. Fall Inspection/Service: The Contractor shall schedule and perform a Pre-Heating season maintenance service call. The following services shall be performed in addition to Preventative Maintenance Regularly Scheduled Activities:
A. Cycle and check each unit for proper heating operation B. Check and clean pilot lights and bearings if needed
C. Replace filters, inspect belts, replace as needed
D. Visually inspect all wiring
E. Inspect and service or repair gas radiant tube and space heaters
4. Winter Inspection / Service: The Contractor shall schedule and perform the following services in addition to Preventative Maintenance Regularly Scheduled Activities.
A. Replace filters, inspect belts, replace as needed
B. Visually inspect all wiring
5. Preventative Maintenance Regularly Scheduled Activities: Preventative Maintenance shall be comprehensive and consist (at minimum) of the following:
A. Heating and Air Conditioning Equipment
a) Check with Facility Maintenance Supervisor for operational deficiencies b) Check area around equipment
c) Examine each piece of equipment and device to see that it is functioning properly and is in good operational condition
d) Clean all components of dust, old lubricants, etc. to allow the equipment to function as designed
e) Lubricate all equipment where needed to permit bearings, gears, and all contact wearing points to operate freely and without undue wear f) Adjust all linkages, motors, drives, etc. that have drifted from the initial design settings and positions
g) Calibrate all sensing, monitoring, output, safety, and readout devices for proper ranges, settings, and optimum efficiencies
h) Check system thermostat operation, temperature and pressure controls and adjust as necessary
i) Inspect and tighten all electrical connections
j) Check for proper voltage and amp draw
k) Inspect safeties
l) Inspect all contacts and relays
m) Inspect all wiring for chafing, burning, or deteriorated insulation n) Inspect all breakers
o) Inspect capacitors
p) Check rain guards
q) Check insulation and clamps
r) Check and adjust dampers
s) Lubricate all motors, bearings, and other moving parts t) Inspect air filters and clear or replace as needed (air filters to be provided by Contractor)
210
15 u) Check all applicable belts for proper condition; replace all belts once beginning of each contract year and then as necessary
v) Check all applicable belt tension and adjust as necessary w) Check drives and pulleys for tightness and alignment x) Inspect fan control
y) Inspect and adjust all valves
z) Inspect oil in compressors and add as necessary
aa) Wash fans at beginning of each contract year
bb) Any applicable VAV Boxes are to be serviced once per year cc) Check for unusual noises, vibration, and wear
dd) Carry out other preventative maintenance procedures recommended by the equipment manufacturer
ee) Test and cycle all equipment as a system after it has been cleaned, lubricated, adjusted, and calibrated to see that it is in good operational condition and at optimum efficiency
ff) Provide itemized checklist documentation of preventative maintenance activities per location and report observations and any unusual or out of scope conditions to the Maintenance Supervisor
gg) Recommend the repair of the device by the addition of replacement parts, should the describe maintenance not be adequate
hh) Recommend the replacement of the device if needed, in view of its condition, age, and cost of previous subsequent repair
ii) Provide service tag on all service units, containing the information listed per specifications
B. Heating Equipment
a) Inspect all pilot lights and operation of the ignition system b) Inspect and clean the flame sensor
c) Inspect and adjust burner assembly
d) Inspect flue pipe, diverter, and flue connections
e) Inspect the heat exchanger
f) Inspect heating coils
g) Inspect temperature rise
h) Inspect furnace safety controls
i) Inspect fuel input
j) Inspect for gas leaks
k) Inspect gas valve operation
l) Inspect gas pressure and set factory specifications
m) Inspect backup heat elements
n) Inspect sequencer operation
o) Inspect actual amperage draw on motors
p) Inspect actual voltage to the unit
q) Inspect oil filter and oil pressure switches
r) Inspect all high limits and safety controls
s) Inspect reversing valve operation
t) Inspect valves, step traps, and belts
211
16 u) Inspect any applicable hot water heaters, boilers, and related pumps.
Inspection shall include annual tune-up of burners and cleaning of boilers as required
C. Air Conditioning Equipment
a) Check refrigerant systems for leaks and operation
b) Inspect temperature drop
c) Check condenser general operation and condition and clean condenser coil thoroughly at the beginning of each contract year and then as necessary i. Check for scaling or corrosion of water-cooled condensers, clean as required
ii. Check condition of air-cooled condensers, clean as required d) Check and adjust condensate pumps and drains as necessary e) Inspect and clean condensate drain pan, drains, and traps to ensure proper draining. Inform the Facility Maintenance Supervisor of unusual or discolored drain pan accumulations
f) Inspect condenser fans – blade conditions, clearances, etc. g) Lubricate condenser fan motors and bearings
h) Inspect amp and voltage draw
i) Inspect evaporator coils and clean at the beginning of each contract year, then as necessary
j) Inspect evaporator drip pan, drains, and filters
k) Inspect all compressors and starter – contacts and free movement l) Inspect compressor general operation and condition, oil level, head pressure, and suction pressures
m) Inspect refrigerant pressure and change
n) Inspect refrigerant system for leaks and for potential leak points – chafing lines, cap tubes, etc.
o) Record amount of refrigerant. If applicable, remove from system and replace appropriate amount
p) Inspect unit disconnect system. Record unit voltage – rated and actual q) Inspect “economizer”, if applicable
r) Megohm or oil test compressors – record readings
s) Inspect compressor terminals
t) Inspect disconnect power box
u) Inspect all coils for cleanliness, fin condition
v) Check for leaks in air supply if applicable
w) Inspect the system to avoid the correct freeze up
D. Air Handlers
a) Check and change filters as necessary
b) Replace all belts one time per year
c) Check drive components for wear and alignment
d) Check blower wheels – conditions and cleanliness
e) Inspect blower housing, deck mountings – cracks, loose bolts, etc. f) Check fan bearings
g) Check blower bearings
h) Check blower motor bearings
212
17 i) Lubricate all bearings at least once at the beginning of each contract year and then as necessary
j) Record supply fan amperage – rated and actual
k) Record return fan amperage – rated and actual
l) Inspect and service VFDs located at each AHU per the following:
i. Clean with dry nitrogen, blowing out the permanent air filter ii. Wipe down cabinet interior, check for proper electrical ground iii. Check with Triac for voltage leakage, tighten connections, and check and reset any alarms (replace/repair parts when necessary) m) Inspect all wiring for chafing, burning, and deteriorated insulation n) Record overall condition of equipment
o) Check heat and cooling coils for cleanliness and clean if needed E. Residential Refrigerant Type A/C Units, Heat Pumps
• Check economizer operation
• Check compressor crankcase heater(s)
• Record:
i. Compressor voltage
ii. Compressor amperage
iii. Operating suction pressure
iv. Operating head pressure
v. Operating superheat
vi. Operating oil level
vii. Operating oil pressure
1. Check unloader function, if applicable
2. Check hot gas bypass function, if applicable
3. Check all controls for proper function and set points
4. Check and record discharge air temperature
5. Record overall condition of equipment
F. Forced Hot Air Heaters, Gas
a) Check combustion controls
b) Check room air intake system
c) Check contacts
d) Check mercury bulbs
e) Inspect all wiring for chafing, burning, and deteriorated insulation f) Clean internal surfaces, if necessary
g) Clean external surfaces
h) Clean burner assembly, if necessary
i) Clean fireside
j) Clean flue
k) Inspect refractory
l) Prepare heater for winter conditions
m) Do efficiency test and record
n) Log heater condition at departure
G. Controls – Temperature, Humidity HVAC Sensors
a) Check alarms
213
18 b) Check the operation of all controls, thermostats, starters, relays, pressure switches, disconnect switches and fuses
c) Perform programming adjustments where needed
d) Clean where needed
e) Check for any overrides
f) Check set points, make adjustments where needed
g) Check contacts and relays, clean and tighten contact where necessary h) Check thermostats, calibrate if necessary
i) Check sensors and adjust if necessary
H. Chillers and Boilers
a) Visual inspections of:
i. Fan assemblies
ii. Belts and sheaves
iii. Motor mounts and vibration pads
iv. Electrical connections and contactors
v. Heating and cooling coils
vi. Filter media and racks
vii. Sign glass condition
viii. Bearings
ix. Spray nozzles and pans
x. Igniter and flame assembly
xi. Heat exchanger
xii. Compressor sections
xiii. Condensing sections
xiv. Heating sections
xv. Humidifiers and strainers
xvi. Seals and packing
xvii. Condensate drains and pans
xviii. Flame composition
b) Physical check and/or test of components including but not limited to:
i. Lubrication requirements
ii. Oil sump, heaters, and temperatures
iii. Starter operations
iv. Water flows
v. Alignment on couplings
vi. Motor operating conditions
vii. Suction and discharge pressures
viii. Flow switch operations
ix. Control interlocks
x. Flue stack assembly
xi. Damper operations
xii. External interlocks
xiii. Motor voltage and amperage
xiv. Refrigerant charges
xv. System(s) leaks
xvi. Oil and fluid levels
xvii. Pressure and temperatures
214
19 xviii. Outside air intakes
xix. Refrigerant pump down
c) Perform air filter replacements provided by the Contractor I. Raypak Boilers
a) Replace air filters
b) Replace the hot surface igniter and flame rod if necessary c) Inspect the gas pressure, combustion pressure, flue, and operating controls d) Calibrate temperature sensors
e) Perform operating check and log performance data
f) Observe operation of related pumps
g) Take external bearing temperature readings with laser thermometer, grease bearings
J. Screw Chillers
Water-cooled Trane RTCH Chiller annual to include but not limited to the following:
a) Mega-Ohm (megger) readings of the main compressor motor b) Contractor to conduct an EPA refrigerant leak check and audit per California State Law, AB32
c) Condenser tube brushing
d) Oil filter replacement and oil sample for laboratory Spectro analysis and report
e) Check operation of oil heater, controls, and safeties f) Calibrate temperature and pressure sensors
g) Perform operating check and log performance data
h) Check and record approach in both evaporator and condenser i) Observe operation of related pumps
j) Take external bearing temperature readings with laser thermometer, grease bearings as needed
K. Air Cooled Chiller
Air-cooled Carrier 30RAN Chiller annual to include but not limited to the following:
a) Mega-Ohm (megger) readings of the compressor motors
b) Contractor to conduct an EPA refrigerant leak check and audit per California Law, AB32
c) Condenser tube brushing
d) Check operation of the oil heaters, controls, and safeties e) Calibrate temperature and pressure sensors
f) Perform operating check and log performance data
g) Check and record approach in both evaporator and condenser h) Observe operation of related pumps
i) Take external bearing temperature readings with laser thermometer, grease bearings as needed
j) Wash condenser coils with water and an EPA approved coil cleaner L. Cooling Tower
215
20 a) Basin cleaning
b) Tower strainer cleaning
c) Float assembly adjustment
d) Inspection of make-up water system
e) Check fan belt, adjust and replace if needed. Contractor to provide matched drive belts, inspect and grease bearings
f) Remove debris from tower basin and remove from site for proper disposal M. Smardt Turbocor Air Cooled Chiller (Police Department) a) Check for visible mechanical damage to compressor
b) Check for excessive vibration from other rotating equipment c) Connect to the compressor using the Service Monitoring Tools software and download fault and event logs. Review and save logs for future reference d) Check main power supply voltages
e) Check for signs of hotspots/discoloration on power cables f) Check amperages as per design
g) Check DC bus voltage
h) Check capacitor mid bus voltage
i) Check all communication cables are secure and tight
j) Check all electronic modules are secure
k) Check physical condition of all exposed printed circuit boards (PCBs) l) Check system refrigeration charge
m) Check system and motor cooling liquid line to ensure sufficient sub-cooling n) Verify discharge check valve operation
o) Check airflow is not obstructed
p) Check fin surfaces are clean
q) Check fan rotation (direction)
r) Annual service to include:
i. Contractor to conduct an EPA refrigerant leak check and audit per California State Law AB32
ii. Check electrical terminals are tight
iii. Check operation of all system safety devices and interlocks iv. Check for oil in the system (compressor must operate in an oil-free environment)
v. Check all exposed PCBs for dust build-up and clean if necessary vi. Check calibration of pressure/temperature sensors
vii. Check operation of IGV assembly
viii. Check superheat level/control, if applicable
ix. Check EXV winding resistance
x. Check fan motor overload devices
xi. Perform moisture-prevention measures
xii. Clean condenser coils with water and an EPA approved coil cleaner xiii. Check fan blades for tightness on shaft
xiv. Check fans for loose rivets and cracks
xv. Check coil fins for damage
xvi. Check and record approach in both evaporator and condenser for each circuit
xvii. Take external bearing temperature readings with laser thermometer 216
21 xviii. Observe operation of related pumps
xix. Check bladder-type expansion tanks for proper air pressure, adjust as required
N. Ajax Boilers (Police Department)
a) Test operating and temperature controls
b) Observe noise level
c) Check for water leaks and lockout codes
d) Test operating control
e) Check pilot/main flame signal using a voltmeter
f) Inspect and clean air filter
g) Observe condition of main flame
h) Annual service to include:
i. Lubricate pilot blower
ii. Check the burner
iii. Clean the coils
iv. Clean gas inlet screen
v. Examine vent system
vi. Examine connections
vii. Check for corrosion
viii. Test for gas leaks
ix. Perform a pilot spark test (every 6 mo.)
x. Perform combustion test (check CO, CO2, excess air, nox, and combustion chamber pressure)
xi. Calibrate temperature sensors, perform operating check and log performance data
xii. Observe operation of related pumps
xiii. Check bladder-type expansion tanks for proper air pressure, adjust as required
O. Chilled Water Air Handling Units, except the firing range units (Police Department) a) Inspect the air handling units for operation
b) Check supply and return fan motors for proper operation c) Check unit for abnormal vibration or broken supports d) Check wiring for burnt or chafed conductors
e) Check belts, bearings, and sheaves for wear, damage, and alignment f) Check contactors and relays for pitting, wear, and damage g) Check heating and cooling coils for leaks, lint, and dirt condition h) Check and clean coil drain pans
i) Check and adjust air dampers (outside, mixed, and return) j) Replace all air filters (Contractor to provide filters) k) Check air filter housing integrity
l) Check P-trap, prime as needed to ensure proper operation m) Check drive alignment, wear, seating, and operation
n) Annual service to include:
i. Wash cooling coil
ii. Perform and log full load performance check
iii. Meg-Ohm (check motors [20Hp and greater] log values) iv. Disassemble and clean magnetic motor starters
217
22 v. Check and tighten electrical connections
vi. Lubricate supply, return fan and motor bearings
vii. Check operation of dampers and actuators
viii. Check integrity of all panels on equipment, replace fasteners as needed
ix. Inspect for evidence of moisture carryover beyond the drain pan from cooling coils
x. Visually inspect exposed ductwork and external piping for insulation and vapor barrier for integrity
xi. Check, make appropriate adjustments and if needed, replace fan belts (Contractor to provide belts)
P. Variable Frequency Drives VFDs (Police Department)
a) Clean cabinet with nitrogen and vacuum
b) Confirm operation of muffin fan
c) Tighten all electrical connections
d) Return unit to normal operation
e) Annual service to include:
i. Clean the permanent air filter
ii. Check for proper electrical ground
iii. Check the Triac for voltage leakage
iv. Tighten connections
v. Check and reset any alarms
Q. Trane Condensing Units (Police Department)
a) Check compressors and fan motors for proper operation b) Check refrigerant tubing for chafing, vibration, or broken supports c) Check wiring for burnt or chafed conductors
d) Check refrigerant system for proper charge and operation e) Check contactors and relays for pitting, wear, and damage f) Annual service to include:
i. Perform leak check
ii. General cleaning and lubrication
iii. Check and tighten electrical connections
iv. Clean condenser coils with water and an EPA approved coil cleaner R. DX Air Handling Units (Police Department)
a) Inspect the air handling units for proper operation
b) Check supply and return fan motors for proper operation c) Check unit for abnormal vibration or broken supports d) Check wiring for burnt or chafed conductors
e) Check belts, bearings, and sheaves for wear, damage, and alignment f) Check contactors and relays for pitting, wear, and damage g) Check heating and cooling coils for leaks, lint, and dirt condition h) Check and clean coil drain pans
i) Check and adjust air dampers (outside, mixed, and return) j) Replace all air filters (Contractor to provide filters) k) Check air filter housing integrity
218
23 l) Check P-trap, prime as needed to ensure proper operation m) Check drive alignment, wear, seating, and operation
n) Annual service to include:
i. Wash cooling coil
ii. Perform and log load performance check
iii. Meg-Ohm (check motors [20Hp and greater] log values) iv. Disassemble and clean magnetic motor starters
v. Check and tighten electrical connections
vi. Lubricate supply, return fan and motor bearings
vii. Check operation of dampers and actuators
viii. Check integrity of all panels on equipment, replace fasteners as needed
ix. Inspect for evidence of moisture carryover beyond the drain pan from cooling coils
x. Visually inspect exposed ductwork and external piping for insulation and vapor barrier for integrity
xi. Check, make appropriate adjustments and if needed, replace fan belts (Contractor to provide belts)
xii. Inspect/replace hot and cold water line actuators when necessary Note: City is responsible for the monthly chilled water treatment for the chiller.
6. Biannual Maintenance - Indoor and Outdoor Coil cleaning is to be completed on a bi-annual basis (twice per year), regularly scheduled in April and October, unless otherwise specified by the Facility Maintenance Supervisor or Authorized City Representative.
7. Annual Maintenance – Contractor will perform scheduled annual preventative maintenance in accordance equipment manufacturer’s instructions and recommendations, with a program of standard routines as determined by your experience, equipment application, and equipment operating hours and location. This service is designed to optimize the reliability and efficiency of the equipment, extend the useful life of the City’s equipment, and provide proactive indications of excessive wear and damage to HVAC systems before a catastrophic failure occurs during the next operating season.
8. Contractor will troubleshoot and/or diagnose HVAC/Mechanical problems and recommend emergency or routine repair programs as required. Contractor will also provide recommendations for additional service(s) that will better enhance equipment performance.
Annual maintenance and repairs will be performed on an hourly basis under the On-call HVAC Services portion of the Agreement. Services include, but not limited to:
A. Eddy Current Testing - Contractor will perform non-destructive eddy current tests on the chiller equipment listed. Testing will be conducted on the condenser and evaporator tub bundles every other year, with the first test completed within six (6) months of the Agreement being executed and every other year thereafter. A report will be submitted on each piece of equipment tested identifying the procedures used to test the equipment, the equipment, calibration methods, test results with description of any abnormal conditions that may exist, recommendations and photographs of the equipment, tubes and tube sheets.
219
24 B. Oil Analysis - Contractor will perform oil analysis on equipment listed. Testing will be conducted every other year, with the first test completed within six (6) months of the Agreement being executed and every other year thereafter. A report will be submitted on sample tested identifying the test date, chiller location, manufacturer, model system, serial number, oil type, and oil information, test results with description of any abnormal conditions that may exist and recommendations.
C. Vibration Analysis - Contractor will perform vibration analysis on equipment listed.
Testing will be conducted every other year, with the first test completed within six (6) months of the Agreement being executed and every other year thereafter. A report will be submitted on each piece of equipment tested identifying the procedures used to test the equipment, the equipment, calibration methods, and test results with description of any abnormal conditions that may exist, recommendations and photographs of the equipment.
9. Building Automation Services – Quarterly services will be provided by the Contractor starting within two weeks of contract award or per the discretion of the City Facility Supervisor. Building automated services will be provided at the following locations:
• City Hall: 13220 Central Ave.
• Police Department: 5450 Guardian Way
Contractor is to conduct a complete inspection, improve equipment operations, increase energy efficiency and other necessary services to reduce or eliminate all premature equipment failure or downtime per the list below:
• Clean control panels and verify the ambient temperature within the panels is not extreme.
• Verify electrical connections in the panels are secure and not loose. • Check and verify that all controllers are online and their programs are intact and are running properly.
• Maintain the system graphical displays and make changes as facilities personnel require.
• Perform software maintenance, file maintenance and database backups (on-site and remote).
• Check and remove conditions or situations that reduce system optimization. • Review historical logs to determine control effectiveness and efficiency. • Field sensor (temperature, humidity, pressure, flow, etc.) accuracy verification and calibration based on spot checks.
• Perform hardware communication tests to determine functional verifications of proper and consistent digital communication.
• Evaluate program control loops and implement modifications and tuning in an effort to enhance system performance.
• Provide supplemental training for system users and operators on an as needed basis.
• Address issues and problems discovered by the City between visits that have been recorded in an on-site trouble log.
• Implement free software system upgrades when these upgrades are released by the manufacture.
• Verify the following:
220
25 • Proper operation of dampers.
• Proper operations of valves.
• Equipment (fan, pump, etc.) variable frequency drive (VFD) operation is working correctly.
• Economizers are not jammed or stuck and exhaust fans are operating correctly. • Make recommendations to City regarding potential modifications of the existing operating hardware and software to enhance performance and increase efficiency.
Provide the City with a cost for any upgrades. Upon approval, the City will issue a separate purchase order for the upgrade.
• Inform the City of any control system hardware or software upgrades which may be beneficial to the system operation.
• Provide a equipment performance report which is to be submitted to the City after each preventative maintenance visit.
III. ON-CALL HVAC SERVICES
On-call Non-Emergency and Emergency HVAC Service calls shall be performed on a 24-hour, 7- day- a-week basis, and unrelated to preventative maintenance activities. The on-call services bid item will provide qualified manpower and equipment on an hourly basis to perform routine HVAC/Mechanical repairs or replacements that do not fall under the description of Preventative Maintenance.
1. On-call non-emergency HVAC service calls: When notified, the Contractor will respond by telephone within thirty (30) minutes after the request is placed. At the discretion of the Facility Maintenance Supervisor, the Contractor shall physically respond to repair calls during normal business hours (Monday – Friday, 6:00 a.m. – 6:00 p.m.) within four (4) hours of receiving the call. Repair calls that occur between 6:00 p.m. through 6:00 a.m., or on weekends and holidays, will be billed at the appropriate premium time rate differential. The Contractor has to provide a written estimate for non-emergency service calls within two (2) days and begin repair work within five (5) days of the original request if the proposed repairs are approved.
A. The Parks and Facilities Manager will authorize all non-emergency work. The Contractor will provide written “not-to-exceed” estimates on all non-emergency work. The estimate will include the number of hours, hourly rate, number and type of employees required, estimated material cost and completion date.
B. It will be the Contractor’s responsibility to ensure they have all information to prepare accurate estimates, at no additional cost to the City.
C. Work will only be performed with the City’s written authorization within the time agreed upon between the City and the Contractor. Upon authorization, actual work will not exceed the Contractor’s estimate. Unreasonable estimates will be deemed cause to terminate this contract.
2. Emergency HVAC Service Calls: When notified, the contractor will respond by telephone within thirty (30) minutes and provide service at the affected site within two (2) hours after the request is placed. The Contractor shall provide a twenty-four (24) hour emergency phone number. The City reserves the right to contract with any vendor in the case of an emergency if no response or untimely response has been made by the contractor. The Parks and Facilities Manager will authorize all emergency work.
221
26 IV. INITIAL SERVICES
1. First Preventative Maintenance Visit: The Contractor shall make arrangements with the Facility Maintenance Supervisor, once the contract is awarded, to perform the Preventative Maintenance seasonal service visit necessary for the current time of the year, within four weeks of the contract documents being completed. The Contractor shall then provide a preventative maintenance and inspections program covering all City HVAC equipment to the Maintenance Supervisor, within ten (10) calendar days of the first service visit. The remaining quarterly visits shall then be scheduled as listed herein or as determined by both parties.
2. First Preventative Maintenance Visit Inventory: The first service for each unit will include confirmation, in writing, of each unit’s location, type, model number, serial number, size and filter.
The Contractor shall manually write-in any updates/changes needed for the HVAC Equipment Inventory and submit it to the Facility Maintenance Supervisor within four (4) months from the contract being executed. Contractor shall submit updated inventory list to the Facility Maintenance Supervisor annually at the beginning of the contract year.
3. Annual Audit: At the request of the Facility Maintenance Supervisor, Contractor to provide a detailed audit of the condition of equipment and provide recommendations.
V. NOTIFICATIONS
The Contractor will notify at least one City representative in the order listed below for impacts to each related activity, a minimum of forty-eight (48) hours before start of any maintenance service.
Martin Soto Facility Maintenance Supervisor (909) 536-8769 Jeff Benson Parks and Facilities Manager (909) 334-3479 VI. SERVICE HOURS
The Contractor shall be prepared to respond to all requests for service 24 hours per day, 365 days per year including unscheduled or emergency work during the following time periods below. The following service hours shall be the basis for the On-call HVAC Services portion of the Agreement.
1. Business Hours: Shall be work performed between 6:00 AM and 6:00 PM, Monday through Friday, excluding legal holidays,
2. Emergency and After-Hour Services: Refers to services/repairs that must be made to continue the uninterrupted operations of the City during regular business hours requiring a response time outside of standard business hours. Work after hours shall be performed after regular business hours, Saturdays, Sundays, or during any City holiday requiring immediate response for any emergency situations that arise.
3. Hours outside the designated regular business hours will be allowed by the City if deemed necessary and approved in advance and in writing by the City's designated representative.
4. Work performed in excess of regular work hours or on weekends or holidays shall be based on the appropriate premium time rate differential. Contractor shall submit a total hourly and rate price for labor that includes, but not be limited to, all costs for labor, overhead charges, travel, and payroll expenses.
222
27 A. Contractor shall try to complete work during the service call in order to prevent follow up work. If follow up work is required to correct recent work, including improper repairs, installation, or substandard parts, the City shall not be charged.
B. If a job cannot be completed during regular business hours and the Contractor can make a temporary repair, the Contractor will be allowed to finish the repair during regular business hours.
VII. RESPONSE TIME
All planned service under this Agreement will be performed during the City’s regular business hours from 6:00 AM to 6:00 PM, Monday to Friday.
1. Preventative Maintenance Service Visits: The Contractor shall notify the Facility Maintenance Supervisor a minimum of 48 hours prior to appearing onsite for a preventative maintenance service. Routine services shall be performed from 6:00 AM to 6:00 PM Monday through Friday.
2. The City expects the Contractor to give “priority” service to any call for repairs in the City.
Contractors responding to this bid must be able to provide service within the times noted herein 24 hours a day, 7 days a week, 365 days a year, including holidays for the duration of this contract.
3. The Contractor must regularly report to the Facility Maintenance Supervisor to keep the City informed of the status of work being performed. Time shall be based on actual time spent on the job site(s). Travel charges to the job site will not be allowed. Lunch break time periods will also not be allowed to be charged.
VIII. TOOLS AND EQUIPMENT
The Contractor shall furnish and maintain all equipment necessary for properly maintaining HVAC systems in City facilities. The City reserves the right to inspect equipment to be used to perform services under this contract. Any equipment determined to be in poor condition must be replaced immediately, at the Contractor’s expense. Failure to provide suitable equipment for carrying out all requirements of this contract may be grounds for termination.
At the request of the City, the Contractor must be able to provide rental equipment if necessary while repairs or replacements are being made.
IX. SERVICE TAG
All technicians shall complete a service tag/sticker and attach it to the serviced equipment after completion of work. The service tag/sticker shall be used to document the following information: the date serviced, the name of the technician(s), and a description of the service(s) performed. The service tag/sticker must contain adequate space to document future repairs and must be placed in a location to prevent weather related damages. The technician shall not place the new service tag over pre-existing service tags, including tags that have previous history and repairs.
X. WARRANTY SERVICE
Contractor material and workmanship guarantee for one (1) year after acceptance. Where parts or material becomes defective during this warranty period, the Contractor shall notify the City so that the warranty may be exercised. The Contractor shall be responsible for exercising maintenance and replacement covered by the warranty.
223
Section Type UnitOfMeasure Quantity Manufacturer ModelNum DeliveryLoc UnitPrice TotalPrice BASE BID - PM BOILER QUARTERLY 4 RYPAK H7-2004 13250 Central Ave $ - BASE BID - PM CHILLER QUARTERLY 4 TRANE RTHC1B1F0H0B1LFVQUCD 13250 Central Ave $ - BASE BID - PM CHILLER QUARTERLY 4 CARRIER 30HXC186R--640-- 13250 Central Ave $ - BASE BID - PM CHILLER QUARTERLY 4 CARRIER 30RAN015---511PT 13220 Central Ave $ - BASE BID - PM AIR HANDLER QUARTERLY 4 MCQUAY RDS800BY 13220 Central Ave $ - BASE BID - PM AIR HANDLER QUARTERLY 4 MCQUAY RDS800BY 13220 Central Ave $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE 4YCC4036A1070AB 13220 Central Ave $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE 4YCC4036A1070AB 13220 Central Ave $ - BASE BID - PM AIR HANDLER QUARTERLY 4 YORK 39MN08B00561N11XXS 13220 Central Ave $ - BASE BID - PM AIR HANDLER QUARTERLY 4 DATA AIR DACD-1132 13220 Central Ave $ - BASE BID - PM AIR HANDLER QUARTERLY 4 DATA AIR DACD-1132 13220 Central Ave $ - BASE BID - PM COOLING TOWER QUARTERLY 4 RECOLD 15125a 13220 Central Ave $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD006 5201 D. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD006 5201 D. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD006 5201 D. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD012 5201 D. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD025 5201 D. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD006--531-- 13191 6th St.. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD006--531-- 13191 6th St.. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD006--531-- 13191 6th St.. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48HJD006--531-- 13191 6th St.. $ - BASE BID - PM BOILER QUARTERLY 4 RYPAK H3-HD401 13180 Central Ave. $ - BASE BID - PM CHILLER QUARTERLY 4 CARRIER 30RAP0405JC4DF10 13123 libaray Ra. $ - BASE BID - PM AIR HANDLER QUARTERLY 4 PACE A-30 AF SI 13180 Central Ave. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48GPN024040311 13123 7th St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48GPN024040311 13123 7th St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48GPN024040311 13123 7th St. $ - BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 YORK 50FCQM17A3A5A0A0A0 13123 7th St. $ - BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 YORK 38YCC060540/FB4RNF050 13123 7th St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 YORK ZJ090510N2EZZ50001A 5050 Schaefer Ave. $ - BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 YORK XP090C00R2A1BAA1A2 5050 Schaefer Ave. $ - BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 YORK B1HX036A06A 5050 Schaefer Ave. $ - BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 YORK CZH02411CA/MC35B3XH1H 5050 Schaefer Ave. $ - BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 YORK CZH02411CA/MC35B3XH1H 5050 Schaefer Ave. $ - BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 YORK YZH036311B/AM480CT 5050 Schaefer Ave. $ - BASE BID - PM COOLER QUARTERLY 4 REZNOR RDH350 5050 Schaefer Ave. $ - BASE BID - PM COOLER QUARTERLY 4 REZNOR RDH350 5050 Schaefer Ave. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 YORK ZJ061S07N2EZZ50001A 5443 B. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 YORK ZJ061S07N2EZZ50001A 5443 B. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 YORK ZJ061S07N2EZZ50001A 5443 B. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 YORK ZJ061S07N2EZZ50001A 5443 B. St. $ - BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 YORK YHJF24S41S1A 5443 B. St. $ - BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 YORK YCS36B22SA 5443 B. St. $ - BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 YORK YHE48B21SA/AX480CT 5493 B. St. $ - BASE BID - PM MINI SPLIT SYSTEM QUARTERLY 4 SAMSUNG AM048TXMDCH 5493 B. St. $ - BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 580BPZ240255AAAV 13271 Central Ave. $ - BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 YORK YHJD60S44S4A/AHX60D3XH21A 5575 Edison Ave. $ - BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 YORK B1HH060A25B 13250 Central Ave. $ - BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 YORK B1HH060A25B 13250 Central Ave. $ - BASE BID - PM AIR HANDLER QUARTERLY 4 MCQUAY RDS802BY 13250 Central Ave. $ - BASE BID - PM AIR HANDLER QUARTERLY 4 MCQUAY RDS802BY 13250 Central Ave. $ - BASE BID - PM SPLIT SYSTEM GAS QUARTERLY 4 YORK CZH06011CA/TM9X060B12MP11A 13150 7th St. $ - BASE BID - PM SPLIT SYSTEM GAS QUARTERLY 4 YORK CZH06011CA/TM9X060B12MP11A 13150 7th St. $ - BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 BARD W36H1-AOOVP4 11860 Telephone Ave. $ - BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 BARD W36H1-AOOVP4 11860 Telephone Ave. $ - BASE BID - PM SPLIT SYSTEM QUARTERLY 4 YORK YCJD60S41S2A 13196 Monte Vista Ave. $ - 224
BASE BID - PM PACKAGED HEAT PUMP QUARTERLY
4 YORK HA120C00A2AAA1A 13196 Monte Vista Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 YORK ZJO90S10N2EZZ50001A 13170 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 YORK ZJO90S10N2EZZ50001A 13170 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 YORK ZJ061S07N2EZZ50001A 13170 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 YORK ZJ061S07N2EZZ50001A 13170 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 YORK ZJ061507N2EZZ50001A 13170 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 YORK ZJ300S32J2EZZ10001B 13170 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 48HJM004 13170 Central Ave. $
-
BASE BID - PM MINI SPLIT SYSTEM QUARTERLY
4 MITSUBISHI ELECTRIC PUZ-836NK37 13170 Central Ave. $
-
BASE BID - PM CHILLER QUARTERLY
4 YORK YCAL0055EC46XDBSDT 13201 Central Ave. $
-
BASE BID - PM BOILER QUARTERLY
4 AO SMITH GB0 750 E42N020000 13201 Central Ave. $
-
BASE BID - PM AIR HANDLER QUARTERLY
4 MAGIC AIRE 090-BRW-4-C 13201 Central Ave. $
-
BASE BID - PM AIR HANDLER QUARTERLY
4 MAGIC AIRE 60-BR-C 13201 Central Ave. $
-
BASE BID - PM AIR HANDLER QUARTERLY
4 MAGIC AIRE 60-BR-C 13201 Central Ave. $
-
BASE BID - PM AIR HANDLER QUARTERLY
4 MAGIC AIRE 60-BR-C 13201 Central Ave. $
-
BASE BID - PM PACKAGED HEAT PUMP QUARTERLY
4 YORK WP078C00R4AABAA1A 13160 7th St. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 LENNOX LGA088HH2G 13170 7th St. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 LENNOX LGC072SH1G 13171 7th St. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 LENNOX LGC120SH1G 13172 7th St. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 LENNOX LGC102SH1G 13173 7th St. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 LENNOX LGC150SH1G 13174 7th St. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13106 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13107 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13108 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13109 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13110 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13111 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13112 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13113 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13114 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50HJQ006- - -501 13115 Central Ave. $
-
BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 CARRIER 50GCQM06A2A5A0A0A0 13116 Central Ave. $
-
BASE BID - PM CHILLER #1 QUARTERLY
4 SMARDT SAA059-2BG6-2A5V 5450 Gardian Way $
-
BASE BID - PM CHILLER #2 QUARTERLY
4 SMARDT SAA059-2BG6-2A5V 5450 Gardian Way $
-
BASE BID - PM BOILER #1 QUARTERLY
4 AJAX WCP-2001-N 5450 Gardian Way $
-
BASE BID - PM BOILER #2 QUARTERLY
4 AJAX WCP-2001-N 5450 Gardian Way $
-
BASE BID - PM SPLIT SYSTEM QUARTERLY
4 TRANE TWE240E40TAA 5450 Gardian Way $
-
BASE BID - PM SPLIT SYSTEM QUARTERLY
4 TRANE TTA240E40TAA 5450 Gardian Way $
-
BASE BID - PM SPLIT SYSTEM QUARTERLY
4 TRANE 4TEC3F60B1000AA 5450 Gardian Way $
-
BASE BID - PM SPLIT SYSTEM QUARTERLY
4 TRANE 4TWA3060A4000BB 5450 Gardian Way $
-
BASE BID - PM AIR HANDLER QUARTERLY
4 TRANE CSAA010UAC00 5450 Gardian Way $
-
BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7603/ X13170900230 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7608/ X13170900270 5450 Gardian Way N/A N/A
BASE BID - PM AIR HANDLER QUARTERLY
4 TRANE CSAA010UAC00 5450 Gardian Way $
-
BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7599/ X13170900190 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7608/ X13170900270 5450 Gardian Way N/A N/A
BASE BID - PM AIR HANDLER QUARTERLY
4 TRANE CSAA021UAC00 5450 Gardian Way $
-
BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7608/ X13170900270 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 177U0802/ X13170900301 5450 Gardian Way N/A N/A
BASE BID - PM AIR HANDLER QUARTERLY
4 TRANE CSAA010UACOO 5450 Gardian Way $
-
BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7603/ X13170900230 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7608/ X13170900270 5450 Gardian Way N/A N/A
BASE BID - PM AIR HANDLER QUARTERLY
4 TRANE CSAA010UAC00 5450 Gardian Way $
-
BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7603/ X13170900230 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7608/ X13170900270 5450 Gardian Way N/A N/A
BASE BID - PM AIR HANDLER QUARTERLY
4 TRANE CSAA003UAC00 5450 Gardian Way $
-
BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7595/ X13170900150 5450 Gardian Way N/A N/A 225
BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7599/ X13170900190 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA006UAC00 5450 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7599/ X13170900190 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7603/ X13170900230 5450 Gardian Way N/A N/A BASE BID - PM AHU RANGE SUPPLY QUARTERLY 4 TEAM AIR CAH21600S 5450 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA014UAC00 5450 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7608/ X13170900270 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY N/A TRANE 174F7608/ X13170900270 5450 Gardian Way N/A N/A BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA017UAC00 5450 Gardian Way $ - BASE BID - PM AHU RANGE EXHAUST QUARTERLY 4 TEAM AIR CAH28500S 5450 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA012UAC00 5450 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA017UAC00 5451 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA010UAC00 5452 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA010UAC00 5453 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA003UAC00 5454 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA006UAC00 5455 Gardian Way $ - BASE BID - PM AIR HANDLER QUARTERLY 4 TRANE CSAA010UAC00 5456 Gardian Way $ - BASE BID - BUILDING AUTOMATION CITY HALL CHILLER/BOIILER/VAV/AHU Month 12 N/A N/A 13250 Central Ave $ - BASE BID - BUILDING AUTOMATION PD CHILLER/BOILER/VAV/AHU Month 12 N/A N/A 5450 Gardian Way $ - BASE BID - EXTRA WORK REGULAR WORKING HOURS Hour 1 N/A N/A N/A $ - BASE BID - EXTRA WORK HOLIDAY HOURS Hour 1 N/A N/A N/A $ - BASE BID - EXTRA WORK AFTER HOURS Hour 1 N/A N/A N/A $ - ALTERNATE BID - ANNUAL AUDIT ALL EQUIPMENT YEAR 1 ALL EQUIPMENT ALL EQUIPMENT CITYWIDE $ - ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 TRANE 4YCC4030A1070AA 13179/13191 9th St. $ - ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 TRANE 4YCC4030A1070AA 13179/13191 9th St. $ - ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 TRANE 4YCC4030A1070AA 13179/13191 9th St. $ - ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 TRANE 4YCC4024A1060AB 13179/13191 9th St. $ - ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 TRANE 4YCC4024A1060AB 13179/13191 9th St. $ - ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 CARRIER 48GSN030040301 13179/13191 9th St. $ - 226
Experience and
References
Over the past five years and beyond, C.E. Mechanical, Inc. has successfully completed numerous contracts as the lead contractor for local Southern California companies, governments, institutions, and more, demonstrating our capability to handle projects of similar scope and complexity.
City of Riverside
(Contact: Ron Herrero, 951-710-5007, [email protected]) Job 1: Five Year Air Compressor and Drier Maintenance. Location: RERC 3&4 and Springs Power Plant. Manufacturer: Ingersoll Rand. Model Numbers: Sierra-H100A, HL6001HE0AA, SSR-EP100S, and TZ1050-EMS.
Our team completed comprehensive Five-Year Preventive Maintenance on Ingersoll Rand compressed air systems at RERC 3&4 and Springs Power Plant, in strict accordance with manufacturer IOM protocols and site-specific operational requirements. The scope included fullservice inspections and OEM-specified component replacements for models Sierra-H100A, HL6001HE0AA, SSR-EP100S, and TZ1050-EMS. Key tasks performed encompassed oil analysis and changeout, separator and inlet valve servicing, drive motor alignment verification, desiccant and filter media replacement in dryers, and thorough inspection of heat exchangers, control systems, and condensate management components. All work was executed with equipment de-energized under lockout/tagout (LOTO) conditions, ensuring Cal/OSHA compliance. Detailed service records were logged, with post-maintenance performance benchmarks recorded to verify reliability, efficiency, and continued uptime of critical air supply infrastructure supporting power generation operations.
Hyundai Corporate
(Contact: Peter Lutgen, Building Engineer, 909-569-3994, [email protected]) Full preventative maintenance for multiple Hyundai Southern California Facilities for many years.
Location: Hyundai Engineering America Technical Center - 81 Bunsen Irvine CA 92618; 12610 East End Ave China CA 91710; 3668 Placentia Ct Chino CA 91710; 14011/14091 12 Street Chino CA 91710; 101 Peters Canyon Rd Irvine CA 92606. Equipment covered: All HVAC/mechanical system equipment types that are listed in City of Chino’s RFP#2025-0015A and beyond.
th
Many other preventative maintenance references available upon request.
C.E. MECHANICAL, INC. · CSLB #: 765670 227
C.E. MECHANICAL, INC. · CSLB #: 765670
Public Agency References
Experience on Public Works Contracts
City of Chino (Reference Contact: Griselda Lara, Buyer, 909-334-3481, [email protected]):
Job 1: Unit Repairs and Unit Replacement. Location: Public Works Yard. Manufacturer: York.
Model Number: ZJ090S10.
Job 2: Unit Service and Repairs. Location: 7th St Theater. Manufacturer: Carrier Model Number: 48GPN0300.
Job 3: Chiller Replacement and Servicing. Location: Chino Library. Manufacturer: Carrier. Model Number: 30GT050510KA.
Job 4: VFD Replacement. Location: 7th St Theater Manufacturer: ABB.
Model Number: ACH58001031A-2.
County of Riverside (Reference Contact: Daniel Ayala, Facilities Management, 951-295-6625, [email protected]):
Job 1: Chiller Service, Repairs, and Maintenance. Location: 911 Call Center. Manufacturer:
Trane. Model Number: CGAFC404AAA1T.
Job 2: Controls, Service, Repairs, and Maintenance. Location: 911 Call Center. Manufacturer:
Carrier (Chiller 1 & 2). Model Numbers: 30RPD10064
Job 3: Service and Repair Existing Tridium Controls System. Location: 911 Call Center.
Manufacturer: Tridium Controls. Model Number: N/A
Job 4: Service Repair and Replacement of Boiler. Location: Public Defenders Office.
Manufacturer: Lochinvar. Model Number: CH-0752.
Department of Transportation (Contact: Denyel Lanik, Procurement, 909-806-3982, [email protected]):
Location: Caltrans San Bernardino, Rosa Parks Memorial Building:
Job 1: Equipment: CRAC (Computer Room Air Conditioning) Unit, Manufacturer: Leibert. Model Number: MND18A-PR074.
Job 2: Replacement of 230/240HP Pumps with addition of VFDs. Chilled water and condenser water pumps. Manufacturer: Peerless Pumps. Model Number: F2-12505F.
Job 3: Chillers 1-3 Service, Repair, and Maintenance. Manufacturer: Trane Chiller 1 Model Number: RT8A0304M. Chiller 2 Model Number: CVHE450. Chiller 3 Model Number: CVHF650. 228
13327 Elliot Ave Chino, CA 91710
Phone: (909) 548-0925
Website: www.cemech.com
Email: [email protected]
Controls References
C.E. MECHANICAL, INC. · CSLB #: 765670
Reference 1 - Elite Property Management - 801 S Chevy Chase Dr, Glendale, CA 91205 Contact: Eric Johnson - [email protected] - 323-448-8671 Description: The building automation system for 801 Chevy Chase was upgraded with ABB BACnet controls, replacing outdated JCI and Delta mechanical systems. The upgrade involved installing BACnet MSTP controllers, sensors, and related devices to enable efficient control of HVAC systems, including boilers, AHUs, and VAVs throughout the building. Operator’s Workstation software was implemented, providing system configuration, a graphical interface, flexible scheduling, and alarm reporting.
A new HMI touchscreen was installed in the penthouse, with provisions for secure remote access to the system. Existing wiring, sensors, and enclosures were reused where feasible to optimize costs and minimize waste. The scope included all programming, commissioning, and engineering work, with a two-year warranty provided for labor and materials.
Reference 2 - Northrup Grumman - 9401 Corbin Ave, Los Angeles, CA 91324 Contact: Alicia Wilkerson - [email protected] - 818-224-0266 Description: The existing Carrier IVU system was successfully replaced with a new ABB automation system, designed with standalone zones to comply with security requirements. Each secured zone was equipped with an Aspect control engine, complete with RS-485 protocol support, housed in dedicated electrical cabinets, and operated via touchscreen interfaces. Up to four control engines were installed along with their respective control panels and touch screens, while 112 BACnet IP VAV controllers and temperature/humidity sensors were also added. Additionally, up to 36 hot water valve actuators were replaced, and air balance was performed in line with the latest building drawings.
Integration was completed for four large package units and four small package units, covering functionalities like start/stop, temperature control, and fan settings. Nine humidifiers and four exhaust fans were also successfully integrated into the automation system with status monitoring capabilities. The graphics package was included, and all necessary wiring was completed to meet Northrop Grumman security standards. Onsite training was provided to ensure operational readiness.
Reference 3 - City Commercial Management - 3350 Shelby St, Ontario, CA 91764 Contact: Marlon Ferman - [email protected] - 909-948-1662 Description: This work involved the furnishing and installation of 46 ABB/Cylon controllers, temperature and humidity wall sensors, duct sensors, four RIB 100va transformers, a 5-port POE switch, and 25 Belimo actuators with 2-way hot water valves. Additionally, conduit and low voltage wire were provided and installed, along with controls programming and a floor plan. Comfort balance and 120v electrical work with conduit were completed, with all tasks performed during normal business hours.
229
Evidence of Insurance
C.E. MECHANICAL, INC. · CSLB #: 765670 230
Certifications
C.E. MECHANICAL, INC. · CSLB #: 765670 231
232
For hardware components, including compressors, inverters, control boards, fan coils, electrical components, exhaust fans, miscellaneous hardware, and replacement motors, and other repair parts pricing will be determined based on verified market rates at the time of procurement.
An industry standard markup of 18% will be applied to cover procurement, logistics, and handling.
Market rates will be substantiated through supplier quotations, manufacturer invoices, or publicly available price indexes to ensure transparency and fairness for both parties. Documentation of market rates will be provided upon request. This markup accounts for potential fluctuations in market conditions, availability, and vendor pricing while ensuring the use of high-quality, manufacturer-approved components.
The pricing structure applies exclusively to the aforementioned hardware and parts not explicitly priced or specified in the RFP response. Labor, service fees, and other non-material costs will be billed as per the agreed rates in the cost proposal with a standard 8.75% tax that is not reflected in our pricing.
Pricing submitted herein shall remain firm for the initial twelve (12) months of the contract term.
Thereafter, on an annual basis, pricing may be adjusted to reflect increases in the cost of labor and materials, based on the percentage change in the Consumer Price Index for All Urban Consumers (CPIU), Los Angeles-Long Beach-Anaheim, CA, All Items, as published by the U.S. Bureau of Labor Statistics (BLS).
Any adjustment shall be calculated using the most recent 12-month period available prior to contract renewal, and shall not exceed 3.5% per year unless otherwise approved in writing by the City of Chino.
If the CPI reflects a negative value (deflation), no increase will be granted. The contractor shall provide a written request for any adjustment, including supporting CPI data, no less than 30 days prior to the renewal date. No retroactive pricing changes will be permitted.
Discounted PM labor:
$167.00/hr Apprentice and $187.00/hr Journeyman (limited to year 1); truck charge: $125.00 Filters (price per) - examples:
20” x 24” x 1”: $5.98 cost with 18% markup
10” x 10” x 1”: $4.35 cost with 18% markup
20” x 22” x 1”: $4.57 cost with 18% markup
16” x 20” x 1”: $5.09 cost with 18% markup
16” x 24” x 2”: $5.42 cost with 18% markup
12” x 20” x 1”: $4.80 cost with 18% markup
Belts - example:
B44: $14.38 cost with 18% markup
Coil Cleaning - example:
$25-50
C.E. Mechanical, Inc.
13327 Elliot Ave Chino, CA 91710
Phone: (909) 548-0925
Pricing Information
C.E. MECHANICAL, INC. · CSLB #: 765670
Contract Documents
233
C.E. Mechanical, Inc.
13327 Elliot Ave Chino, CA 91710
Phone: (909) 548-0925
C.E. MECHANICAL, INC. · CSLB #: 765670 234
Examples:
City Hall: $38,507.80
NAC: $3,919.60
Children’s Youth Museum: $4,711.00
Library: $8,384.72
7 St Theater: $3,134.76
th
Public Works Admin, Warehouse, Fleet: $6,198.32
Pricing summaries are fully matrixed in the attached pages.
C.E. Mechanical, Inc.
13327 Elliot Ave Chino, CA 91710
Phone: (909) 548-0925
Pricing Information - Year 1
C.E. MECHANICAL, INC. · CSLB #: 765670 235
BASE BID - PM
$ 1 BOILER QUARTERLY 4 $953.00 $3,812.00 Yes RYPAK H7-2004 2 CHILLER QUARTERLY 4 $2,054.51 $8,218.04 Yes TRANE RTHC1B1F0H0B1L… 3 CHILLER QUARTERLY 4 $2,054.51 $8,218.04 Yes CARRIER 30HXC186R--640-- 4 CHILLER QUARTERLY 4 $2,054.51 $8,218.04 Yes CARRIER 30RAN015---511PT 5 AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes MCQUAY RDS800BY 6 AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes MCQUAY RDS800BY 7 AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes TRANE 4YCC4036A1070AB 8 AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes TRANE 4YCC4036A1070AB 9 AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes YORK 39MN08B00561N11… 10 AIR HANDLER QUARTERLY
4 $318.32 $1,273.28 Yes DATA AIR DACD-1132
11 AIR HANDLER QUARTERLY
4 $318.32 $1,273.28 Yes DATA AIR DACD-1132
12 COOLING TOWER QUARTERLY
4 $600.50 $2,402.00 Yes RECOLD 15125a
13 PACKAGED GAS/E… QUARTERLY
4 $195.98 $783.92 Yes CARRIER 48HJD006
14 PACKAGED GAS/E… QUARTERLY
4 $195.98 $783.92 Yes CARRIER 48HJD006
15 PACKAGED GAS/E… QUARTERLY
4 $195.98 $783.92 Yes CARRIER 48HJD006
16 PACKAGED GAS/E… QUARTERLY
4 $195.98 $783.92 Yes CARRIER 48HJD012
17 PACKAGED GAS/E… QUARTERLY
4 $195.98 $783.92 Yes CARRIER 48HJD025
18 PACKAGED GAS/E… QUARTERLY
4 $235.55 $942.20 Yes CARRIER 48HJD006--531--
19 PACKAGED GAS/E… QUARTERLY
4 $235.55 $942.20 Yes CARRIER 48HJD006--531--
20 PACKAGED GAS/E… QUARTERLY
4 $235.55 $942.20 Yes CARRIER 48HJD006--531--
21 PACKAGED GAS/E… QUARTERLY
4 $235.55 $942.20 Yes CARRIER 48HJD006--531--
22 BOILER QUARTERLY
4 $840.59 $3,362.36 Yes RYPAK H3-HD401
23 CHILLER QUARTERLY
4 $840.59 $3,362.36 Yes CARRIER 30RAP0405JC4DF10
24 AIR HANDLER QUARTERLY
4 $415.00 $1,660.00 Yes PACE A-30 AF SI
25 PACKAGED GAS/E… QUARTERLY
4 $148.03 $592.12 Yes CARRIER 48GPN024040311
26 PACKAGED GAS/E… QUARTERLY
4 $148.03 $592.12 Yes CARRIER 48GPN024040311
27 PACKAGED GAS/E… QUARTERLY
4 $148.03 $592.12 Yes CARRIER 48GPN024040311
28 PACKAGED HEAT … QUARTERLY
4 $211.85 $847.40 Yes YORK 50FCQM17A3A5A0…
29 SPLIT SYSTEM HE… QUARTERLY
4 $202.75 $811.00 Yes YORK 38YCC060540/FB4…
30 PACKAGED GAS/E… QUARTERLY
4 $212.72 $850.88 Yes YORK ZJ090510N2EZZ50…
31 PACKAGED HEAT … QUARTERLY
4 $196.11 $784.44 Yes YORK XP090C00R2A1BA…
32 PACKAGED HEAT … QUARTERLY
4 $196.11 $784.44 Yes YORK B1HX036A06A
33 SPLIT SYSTEM HE… QUARTERLY
4 $182.24 $728.96 Yes YORK CZH02411CA/MC3…
34 SPLIT SYSTEM HE… QUARTERLY
4 $182.24 $728.96 Yes YORK CZH02411CA/MC3…
35 SPLIT SYSTEM HE… QUARTERLY
4 $182.24 $728.96 Yes YORK YZH036311B/AM48…
36 COOLER QUARTERLY
4 $198.96 $795.84 Yes REZNOR RDH350
37 COOLER QUARTERLY
4 $198.96 $795.84 Yes REZNOR RDH350
38 PACKAGED GAS/E… QUARTERLY
4 $212.31 $849.24 Yes YORK ZJ061S07N2EZZ50…
39 PACKAGED GAS/E… QUARTERLY
4 $212.31 $849.24 Yes YORK ZJ061S07N2EZZ50…
40 PACKAGED GAS/E… QUARTERLY
4 $212.31 $849.24 Yes YORK ZJ061S07N2EZZ50…
41 PACKAGED GAS/E… QUARTERLY
4 $212.31 $849.24 Yes YORK ZJ061S07N2EZZ50…
42 SPLIT SYSTEM HE… QUARTERLY
4 $198.97 $795.88 Yes YORK YHJF24S41S1A
43 SPLIT SYSTEM HE… QUARTERLY
4 $198.97 $795.88 Yes YORK YCS36B22SA
44 SPLIT SYSTEM HE… QUARTERLY
4 $190.64 $762.56 Yes YORK YHE48B21SA/AX48…
45 MINI SPLIT SYSTEM QUARTERLY
4 $190.64 $762.56 Yes SAMSUNG AM048TXMDCH
46 PACKAGED GAS/E… QUARTERLY
4 $221.12 $884.48 Yes CARRIER 580BPZ240255AAAV
47 SPLIT SYSTEM HE… QUARTERLY
4 $198.12 $792.48 Yes YORK YHJD60S44S4A/AH…
48 PACKAGED HEAT … QUARTERLY
4 $211.85 $847.40 Yes YORK B1HH060A25B
49 PACKAGED HEAT … QUARTERLY
4 $211.85 $847.40 Yes YORK B1HH060A25B
50 AIR HANDLER QUARTERLY
4 $318.32 $1,273.28 Yes MCQUAY RDS802BY
51 AIR HANDLER QUARTERLY
4 $318.32 $1,273.28 Yes MCQUAY RDS802BY
52 SPLIT SYSTEM GAS QUARTERLY
4 $198.38 $793.52 Yes YORK CZH06011CA/TM9…
53 SPLIT SYSTEM GAS QUARTERLY
4 $198.38 $793.52 Yes YORK CZH06011CA/TM9…
Asset Frequency Qty Frequency Cost Total Annual Cost Year 1 Make Model 236
54 PACKAGED HEAT … QUARTERLY
4 $227.47 $909.88 Yes BARD W36H1-AOOVP4
55 PACKAGED HEAT … QUARTERLY
4 $227.47 $909.88 Yes BARD W36H1-AOOVP4
56 SPLIT SYSTEM QUARTERLY
4 $201.69 $806.76 Yes YORK YCJD60S41S2A
57 PACKAGED HEAT … QUARTERLY
4 $201.69 $806.76 Yes YORK HA120C00A2AAA1A
58 PACKAGED GAS/E… QUARTERLY
4 $209.76 $839.04 Yes YORK ZJO90S10N2EZZ50…
59 PACKAGED GAS/E… QUARTERLY
4 $209.76 $839.04 Yes YORK ZJO90S10N2EZZ50…
60 PACKAGED GAS/E… QUARTERLY
4 $209.76 $839.04 Yes YORK ZJ061S07N2EZZ50…
61 PACKAGED GAS/E… QUARTERLY
4 $209.76 $839.04 Yes YORK ZJ061S07N2EZZ50…
62 PACKAGED GAS/E… QUARTERLY
4 $209.76 $839.04 Yes YORK ZJ061507N2EZZ50…
63 PACKAGED GAS/E… QUARTERLY
4 $209.76 $839.04 Yes YORK ZJ300S32J2EZZ10…
64 PACKAGED GAS/E… QUARTERLY
4 $209.76 $839.04 Yes CARRIER 48HJM004
65 MINI SPLIT SYSTEM QUARTERLY
4 $185.00 $740.00 Yes MITSUBISHI ELEC… PUZ-836NK37
66 CHILLER QUARTERLY
4 $985.50 $3,942.00 Yes YORK YCAL0055EC46XD…
67 BOILER QUARTERLY
4 $985.50 $3,942.00 Yes AO SMITH GB0 750 E42N020000
68 AIR HANDLER QUARTERLY
4 $265.03 $1,060.12 Yes MAGIC AIRE 090-BRW-4-C
69 AIR HANDLER QUARTERLY
4 $265.03 $1,060.12 Yes MAGIC AIRE 60-BR-C
70 AIR HANDLER QUARTERLY
4 $265.03 $1,060.12 Yes MAGIC AIRE 60-BR-C
71 AIR HANDLER QUARTERLY
4 $265.03 $1,060.12 Yes MAGIC AIRE 60-BR-C
72 PACKAGED HEAT … QUARTERLY
4 $225.75 $903.00 Yes YORK WP078C00R4AABA…
73 PACKAGED GAS/E… QUARTERLY
4 $213.33 $853.32 Yes LENNOX LGA088HH2G
74 PACKAGED GAS/E… QUARTERLY
4 $213.33 $853.32 Yes LENNOX LGC072SH1G
75 PACKAGED GAS/E… QUARTERLY
4 $213.33 $853.32 Yes LENNOX LGC120SH1G
76 PACKAGED GAS/E… QUARTERLY
4 $213.33 $853.32 Yes LENNOX LGC102SH1G
77 PACKAGED GAS/E… QUARTERLY
4 $213.33 $853.32 Yes LENNOX LGC150SH1G
78 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
79 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
80 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
81 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
82 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
83 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
84 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
85 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
86 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
87 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50HJQ006- - -501
88 PACKAGED GAS/E… QUARTERLY
4 $170.50 $682.00 Yes CARRIER 50GCQM06A2A5A0…
89 CHILLER #1 QUARTERLY
4 $1,900.37 $7,601.48 Yes SMARDT SAA059-2BG6-2A5V
90 CHILLER #2 QUARTERLY
4 $1,900.37 $7,601.48 Yes SMARDT SAA059-2BG6-2A5V
91 BOILER #1 QUARTERLY
4 $985.99 $3,943.96 Yes AJAX WCP-2001-N
92 BOILER #2 QUARTERLY
4 $985.99 $3,943.96 Yes AJAX WCP-2001-N
93 SPLIT SYSTEM QUARTERLY
4 $181.50 $726.00 Yes TRANE TWE240E40TAA
94 SPLIT SYSTEM QUARTERLY
4 $181.50 $726.00 Yes TRANE TTA240E40TAA
95 SPLIT SYSTEM QUARTERLY
4 $181.50 $726.00 Yes TRANE 4TEC3F60B1000AA
96 SPLIT SYSTEM QUARTERLY
4 $181.50 $726.00 Yes TRANE 4TWA3060A4000BB
97 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA010UAC00
98 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA010UAC00
99 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA021UAC00
100 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA010UACOO
101 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA010UAC00
102 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA003UAC00
103 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA006UAC00
104 AHU RANGE SUPP… QUARTERLY
4 $188.88 $755.52 Yes TEAM AIR CAH21600S
105 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA014UAC00
106 AIR HANDLER QUARTERLY
4 $255.24 $1,020.96 Yes TRANE CSAA017UAC00
237
107 AHU RANGE EXHA… QUARTERLY 4 $188.88 $755.52 Yes TEAM AIR CAH28500S 108 AIR HANDLER QUARTERLY 4 $255.24 $1,020.96 Yes TRANE CSAA012UAC00 109 AIR HANDLER QUARTERLY 4 $255.24 $1,020.96 Yes TRANE CSAA017UAC00 110 AIR HANDLER QUARTERLY 4 $255.24 $1,020.96 Yes TRANE CSAA010UAC00 111 AIR HANDLER QUARTERLY 4 $255.24 $1,020.96 Yes TRANE CSAA010UAC00 112 AIR HANDLER QUARTERLY 4 $255.24 $1,020.96 Yes TRANE CSAA003UAC00 113 AIR HANDLER QUARTERLY 4 $255.24 $1,020.96 Yes TRANE CSAA006UAC00 114 AIR HANDLER QUARTERLY 4 $255.24 $1,020.96 Yes TRANE CSAA010UAC00
BASE BID - BUILDING AUTOMATION CITY HALL
115 CHILLER/BOIILER/… Month 12 $307.52 $3,690.24 Yes N/A N/A
BASE BID - BUILDING AUTOMATION PD
116 CHILLER/BOILER/V… Month 12 $307.52 $3,690.24 Yes N/A N/A
BASE BID - EXTRA WORK
117 REGULAR WORKI… Hour 1 $197.00 $197.00 Yes N/A N/A
118 HOLIDAY HOURS Hour 1 $394.00 $394.00 Yes N/A N/A
119 AFTER HOURS Hour 1 $295.50 $295.50 Yes N/A N/A
ALTERNATE BID - ANNUAL AUDIT
120 ALL EQUIPMENT YEAR 1 $158,190.40 excluding automation and alternative PM below ALL EQUIPMENT ALL EQUIPMENT ALTERNATE BID - PM $4,092.00
121 PACKAGED GAS/E… QUARTERLY 4 $170.50 $682.00 Yes TRANE 4YCC4030A1070AA 122 PACKAGED GAS/E… QUARTERLY 4 $170.50 $682.00 Yes TRANE 4YCC4030A1070AA 123 PACKAGED GAS/E… QUARTERLY 4 $170.50 $682.00 Yes TRANE 4YCC4030A1070AA 124 PACKAGED GAS/E… QUARTERLY 4 $170.50 $682.00 Yes TRANE 4YCC4024A1060AB 125 PACKAGED GAS/E… QUARTERLY 4 $170.50 $682.00 Yes TRANE 4YCC4024A1060AB 126 PACKAGED GAS/E… QUARTERLY 4 $170.50 $682.00 Yes CARRIER 48GSN030040301 238
City of Chino
Bid Results for Project CITYWIDE HVAC PREVENTATIVE MAINTENANCE AND REPAIRS (RFP#2025-0015A) Issued on 07/10/2025
Bid Due on August 07, 2025 10:00 AM (PDT)
Exported on 09/04/2025
Line Totals (Unit Price * Quantity)
Item Num Section Item Code Description Reference Unit of Measure Quantity C.E. Mechanical, Inc. - Unit Price C.E. Mechanical, Inc. - Line Total C.E. Mechanical, Inc. - Response C.E. Mechanical, Inc. - Comment 1 BASE BID - PM BOILER QUARTERLY 4 $953.00 $3,812.00 Yes 2 BASE BID - PM CHILLER QUARTERLY 4 $2,054.51 $8,218.04 Yes 3 BASE BID - PM CHILLER QUARTERLY 4 $2,054.51 $8,218.04 Yes 4 BASE BID - PM CHILLER QUARTERLY 4 $2,054.51 $8,218.04 Yes 5 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 6 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 7 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 8 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 9 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 10 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 11 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 12 BASE BID - PM COOLING TOWER QUARTERLY 4 $600.50 $2,402.00 Yes 13 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $195.98 $783.92 Yes 14 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $195.98 $783.92 Yes 15 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $195.98 $783.92 Yes 16 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $195.98 $783.92 Yes 17 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $195.98 $783.92 Yes 18 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $235.55 $942.20 Yes 19 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $235.55 $942.20 Yes 20 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $235.55 $942.20 Yes 21 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $235.55 $942.20 Yes 22 BASE BID - PM BOILER QUARTERLY 4 $840.59 $3,362.36 Yes 23 BASE BID - PM CHILLER QUARTERLY 4 $840.59 $3,362.36 Yes 24 BASE BID - PM AIR HANDLER QUARTERLY 4 $415.00 $1,660.00 Yes 25 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $148.03 $592.12 Yes 26 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $148.03 $592.12 Yes 27 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $148.03 $592.12 Yes 28 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 $211.85 $847.40 Yes 29 BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 $202.75 $811.00 Yes 30 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $212.72 $850.88 Yes 31 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 $196.11 $784.44 Yes 32 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 $196.11 $784.44 Yes 33 BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 $182.24 $728.96 Yes 34 BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 $182.24 $728.96 Yes 35 BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 $182.24 $728.96 Yes 36 BASE BID - PM COOLER QUARTERLY 4 $198.96 $795.84 Yes 37 BASE BID - PM COOLER QUARTERLY 4 $198.96 $795.84 Yes 38 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $212.31 $849.24 Yes 39 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $212.31 $849.24 Yes 40 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $212.31 $849.24 Yes 41 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $212.31 $849.24 Yes 42 BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 $198.97 $795.88 Yes 43 BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 $198.97 $795.88 Yes 44 BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 $190.64 $762.56 Yes 45 BASE BID - PM MINI SPLIT SYSTEM QUARTERLY 4 $190.64 $762.56 Yes 46 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $221.12 $884.48 Yes 47 BASE BID - PM SPLIT SYSTEM HEAT PUMP QUARTERLY 4 $198.12 $792.48 Yes 48 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 $211.85 $847.40 Yes 49 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 $211.85 $847.40 Yes 50 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 51 BASE BID - PM AIR HANDLER QUARTERLY 4 $318.32 $1,273.28 Yes 52 BASE BID - PM SPLIT SYSTEM GAS QUARTERLY 4 $198.38 $793.52 Yes 53 BASE BID - PM SPLIT SYSTEM GAS QUARTERLY 4 $198.38 $793.52 Yes 54 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 $227.47 $909.88 Yes 55 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 $227.47 $909.88 Yes 56 BASE BID - PM SPLIT SYSTEM QUARTERLY 4 $201.69 $806.76 Yes 57 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY 4 $201.69 $806.76 Yes 58 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $209.76 $839.04 Yes Contract Documents
239
59 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY
4 $209.76 $839.04 Yes
60 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $209.76 $839.04 Yes 61 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $209.76 $839.04 Yes 62 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $209.76 $839.04 Yes 63 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $209.76 $839.04 Yes 64 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $209.76 $839.04 Yes 65 BASE BID - PM MINI SPLIT SYSTEM QUARTERLY4 $185.00 $740.00 Yes 66 BASE BID - PM CHILLER QUARTERLY4 $985.50 $3,942.00 Yes 67 BASE BID - PM BOILER QUARTERLY4 $985.50 $3,942.00 Yes 68 BASE BID - PM AIR HANDLER QUARTERLY4 $265.03 $1,060.12 Yes 69 BASE BID - PM AIR HANDLER QUARTERLY4 $265.03 $1,060.12 Yes 70 BASE BID - PM AIR HANDLER QUARTERLY4 $265.03 $1,060.12 Yes 71 BASE BID - PM AIR HANDLER QUARTERLY4 $265.03 $1,060.12 Yes 72 BASE BID - PM PACKAGED HEAT PUMP QUARTERLY4 $225.75 $903.00 Yes 73 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $213.33 $853.32 Yes 74 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $213.33 $853.32 Yes 75 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $213.33 $853.32 Yes 76 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $213.33 $853.32 Yes 77 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $213.33 $853.32 Yes 78 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 79 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 80 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 81 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 82 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 83 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 84 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 85 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 86 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 87 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 88 BASE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY4 $170.50 $682.00 Yes 89 BASE BID - PM CHILLER #1 QUARTERLY4 $1,900.37 $7,601.48 Yes 90 BASE BID - PM CHILLER #2 QUARTERLY4 $1,900.37 $7,601.48 Yes 91 BASE BID - PM BOILER #1 QUARTERLY4 $985.99 $3,943.96 Yes 92 BASE BID - PM BOILER #2 QUARTERLY4 $985.99 $3,943.96 Yes 93 BASE BID - PM SPLIT SYSTEM QUARTERLY4 $181.50 $726.00 Yes 94 BASE BID - PM SPLIT SYSTEM QUARTERLY4 $181.50 $726.00 Yes 95 BASE BID - PM SPLIT SYSTEM QUARTERLY4 $181.50 $726.00 Yes 96 BASE BID - PM SPLIT SYSTEM QUARTERLY4 $181.50 $726.00 Yes 97 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 98 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 99 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 100 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 101 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 102 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 103 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 104 BASE BID - PM AHU RANGE SUPPLY QUARTERLY4 $188.88 $755.52 Yes 105 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 106 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 107 BASE BID - PM AHU RANGE EXHAUST QUARTERLY4 $188.88 $755.52 Yes 108 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 109 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 110 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 111 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 112 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 113 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes 114 BASE BID - PM AIR HANDLER QUARTERLY4 $255.24 $1,020.96 Yes $158,190.40
115 BASE BID - BUILDING AUTOMATION CITY HALL CHILLER/BOIILER/VAV/AHU Month 12 $307.52 $3,690.24 Yes $3,690.24
116 BASE BID - BUILDING AUTOMATION PD CHILLER/BOILER/VAV/AHU Month 12 $307.52 $3,690.24 Yes $3,690.24
117 BASE BID - EXTRA WORK REGULAR WORKING HOURS Hour1 $197.00 $197.00 Yes 118 BASE BID - EXTRA WORK HOLIDAY HOURS Hour1 $394.00 $394.00 Yes 119 BASE BID - EXTRA WORK AFTER HOURS Hour1 $295.50 $295.50 Yes $886.50
120 ALTERNATE BID - ANNUAL AUDIT ALL EQUIPMENT YEAR1 No Base total is $158,190.40 without automation; $ 240
$0.00
121 ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $170.50 $682.00 Yes 122 ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $170.50 $682.00 Yes 123 ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $170.50 $682.00 Yes 124 ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $170.50 $682.00 Yes 125 ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $170.50 $682.00 Yes 126 ALTERNATE BID - PM PACKAGED GAS/ELECTRIC QUARTERLY 4 $170.50 $682.00 Yes $4,092.00
$170,549.38
241
1 full year bid proposal base bid: $ 165,570.88
6 month base bid w/automation and bonds: $ 125,000.00
Year 2 (with 3.5% CPI) $ 172,000.00
Year 3 (with 3.5% CPI) $ 179,000.00
Total PM: $ 476,000.00
Total Extra Repairs: $ 900,000.00
CONTRACT TOTAL 2.5 YEARS: $ 1,376,000.00
CONTRACT TOTAL 2.5 YEARS
Contract Cost Summary
242
MEMORANDUM
CITY OF CHINO
PUBLIC WORKS DEPARTMENT
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TO: LINDA REICH, CITY MANAGER
FROM: HYE JIN LEE, PE, DIRECTOR OF PUBLIC WORKS
SUBJECT
..titl e
Cooperative Agreement with the California Department of Transportation (Caltrans) for the relinquishment of State Route 83 (Euclid Avenue).
..end
RECOMMENDATION
..recommendation
1) Adopt Resolution No. 2025-090, authorizing the City Manager to execute Agreement No. 08- 1799 (Relinquishment Agreement) with Caltrans to accept a lump sum payment of $18,823,725 for the transfer of ownership of State Route 83 to the City of Chino; 2) establish a revenue object code within the General Fund for the deposit and project number MS265 for tracking future expenditures; 3) appropriate $60,000 to the Euclid Avenue Program for contract services to secure the transfer of easements on Federal Land for the Euclid Avenue Relinquishment Project MS265; and 4) authorize the City Manager to execute the necessary documents on behalf of the City.
..body
FISCAL IMPACT
This transaction will require a revenue increase in the General Fund of $18,823,725 and an appropriation of $60,000 from the General Fund 100, to prepare an easement transfer document required for relinquishment. A new revenue account and project number MS265 will be established to track all transactions for the relinquishment funds. During the close of each fiscal year, Accounting will reserve and track unspent amounts in the General Fund Assigned balance to be earmarked for future maintenance and project costs of Euclid Avenue.
Following California Transportation Commission (CTC) approval, tentatively scheduled for its March 2026 meeting, Caltrans will file a Resolution of Relinquishment with the County Recorder’s Office. Approximately 30 days following this recordation, the City will receive a onetime lump-sum payment of $18,823,725. Anticipated annual maintenance and capital improvement expenses will be incorporated into the Fiscal Year 2026-27 budget and 5-year Capital Improvement Program. Maintenance costs to close out Fiscal Year 2025-26 will be absorbed through current Citywide maintenance programs.
CITY OF CHINO MISSION / VISION / VALUES / STRATEGIC ISSUES The recommendation detailed above furthers the City’s values and strategic issues that serve as key pillars on which identified priorities, goals, and action plans are built, by fostering:
Positive City Image
Financial Stability
Responsible Long-Range Planning
Public Service Excellence through Internal and External Partnerships 243
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: COOPERATIVE AGREEMENT WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) FOR THE RELINQUISHMENT OF STATE ROUTE 83 (EUCLID AVENUE).
PAGE: 2
Revenue: 1001000-TBD-MS265 Expenditure: 1007010-40010-43650-MS265 Transfer In: Transfer Out:
244
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: COOPERATIVE AGREEMENT WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) FOR THE RELINQUISHMENT OF STATE ROUTE 83 (EUCLID AVENUE).
PAGE: 3
BACKGROUND
Euclid Avenue was established as a state highway in 1934 and designated as California State Route 83 (SR-83) in 1964. SR-83 has historically served as a key north-south corridor for the region spanning 14 miles through the cities of Upland, Ontario, and Chino. In 2010, the City of Upland completed the relinquishment of SR-83 within its city limits, transferring control from Caltrans to Upland. Similarly, in 2024, the City of Ontario finalized the relinquishment of the portion of SR-83 within its jurisdiction, gaining local authority over the roadway for future planning, maintenance, and improvements.
On January 17, 2023, City Council adopted Resolution No. 2023-006 supporting and initiating State Legislation for the California Transportation Commission’s (CTC) relinquishment of SR-83 in the City of Chino. SR-83 spans 6.25 miles from Riverside Drive to State Route 71 (Exhibit A).
In October 2023, Assembly Bill 250 passed, authorizing the CTC to consider relinquishing the portion of SR-83 within the City of Chino limits.
In September 2024, Caltrans staff provided a formal compensation offer to the City in the amount of $15,885,000 for the relinquishment of SR-83. This financial offer began further discussions between the City and Caltrans regarding potential terms of a relinquishment agreement. In April 2025, the City received a draft Relinquishment Agreement for review and comment. In August 2025, Caltrans, City staff, and City Attorney came to an agreement on the final language and terms. In September 2025, after negotiations between City staff and Caltrans District 8, Caltrans Headquarters approved an additional $2,938,725 in funding—an
18.5% increase over the original allocation—raising the total compensation to $18,823,725.
On September 30, 2025, City staff presented an update to the Infrastructure/Streets Committee on the progress of the relinquishment and negotiated financial compensation. The Committee provided support of the relinquishment to staff, allowing the Resolution to be brought forth to City Council for consideration.
ISSUES/ANALYSIS
Taking ownership of Euclid Avenue from Caltrans will enable the City to strategically align roadway improvements with local economic development goals. With greater control, the City can implement infrastructure upgrades and streetscape enhancements that attract investment, support local businesses, and create a more vibrant commercial corridor. This transition positions the City to proactively shape Euclid Avenue into a catalyst for sustained economic growth.
With relinquishment, the City gains the ability to pursue state and federal grants, as well as other external funding opportunities through SBCTA, to support roadway upgrades, safety enhancements, tailored traffic management, traffic signal interconnect and cameras, and beautification projects without relying solely on general fund dollars. This empowers Chino with greater local control, ensuring that improvements reflect community priorities and can be implemented more efficiently. Ultimately, the transition provides both fiscal flexibility and the autonomy needed to shape Euclid Avenue into a corridor that better serves residents, businesses, and visitors.
By signing the Agreement and adopting Resolution No. 2025-090, the City will accept and assume full maintenance, ownership, responsibility, control, and liability in perpetuity over the relinquished facilities in exchange for the payment of $18,823,725 from Caltrans to the City of Chino.
245
CITY COUNCIL MEETING DATE: DECEMBER 2, 2025
TITLE: COOPERATIVE AGREEMENT WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) FOR THE RELINQUISHMENT OF STATE ROUTE 83 (EUCLID AVENUE).
PAGE: 4
A portion of Euclid Avenue between SR-71 and Pine Avenue is located on federally managed lands of the United States Army Corps of Engineers (USACE). To transfer those rights, the City will need to enter into a temporary License Agreement with USACE for interim rights to access and maintain Euclid Avenue until a permanent roadway easement is executed between the City and USACE. To secure outstanding rights of Euclid Avenue on Federal land, the City will need to appropriate $60,000 to have an on-call consultant complete a legal description at a price of $7,475 and have USACE administer the process at an approximate cost of $50,000 which will finalize the easement transfer.
Staff recommends adoption of Resolution No. 2025-090 authorizing the City Manager to execute a Cooperative Agreement with Caltrans for the relinquishment of Euclid Avenue to the City. Following the CTC’s approval of the Resolution of Relinquishment, Caltrans’s recording of said Resolution with the County Recorder’s Office, and City’s receipt of an additional 18.5% funding allocation, totaling $2,938,725 above the original $15,885,000 programmed amount for a combined total of $18,823,715, the City shall formally accept the portion of Euclid Avenue in perpetuity identified in the Relinquishment Agreement.
Attachments: Exhibit A – Relinquishment Area Vicinity Map Exhibit B – Resolution No. 2025-090 (Authorizing Cooperative Agreement) Exhibit C – Agreement No. 08-1799 (Relinquishment Agreement) 246
247
RESOLUTION NO. 2025-090
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHINO,
CALIFORNIA, AUTHORIZING THE CITY MANAGER TO EXECUTE A
COOPERATIVE AGREEMENT FOR RELINQUISHMENT 509-S WITH THE
CALIFORNIA DEPARTMENT OF TRANSPORTATION TO RELINQUISH STATE ROUTE 83 (EUCLID AVENUE) WITHIN THE CITY OF CHINO FROM STATE ROUTE 71 TO THE NORTH CITY LIMIT AT RIVERSIDE DRIVE.
WHEREAS, the State of California Department of Transportation (“Caltrans”) is authorized to relinquish certain areas of right of way pursuant to Streets and Highways Code Section 73 within a local agency’s jurisdiction, with the local agency’s consent, and with the approval of the California Transportation Commission (“CTC”); and WHEREAS, Caltrans and the City of Chino (“City”), pursuant to California Streets and Highways Code Sections 73 and 383, are authorized to enter into a Cooperative Agreement providing for relinquishment by Caltrans to the City a portion of State Highway 83 (“SR-83”) also known as Euclid Avenue. Said portion referred to hereinafter as Relinquished Facilities; and WHEREAS, Caltrans desires to relinquish to the City those portions of SR-83 (Euclid Avenue) within City limits from Post Mile 0.197 to Post Mile 6.41 (northeast of State Route 71 to Riverside Drive) as depicted in Exhibits A-1 through A-5, attached hereto and incorporated by this reference; and
WHEREAS, Caltrans desires to relinquish to the City those portions of SR-83 crossing the federally-managed lands of the United States Army Corps of Engineers (USACE) shown as Segment 1 from Post Mile 0.197 to Post Mile 1.63 as depicted in Exhibits A-1, A-2 and A-3 previously attached and incorporated above. Currently, Caltrans holds a non-transferrable highway easement for SR-83 assigned by USACE. Upon relinquishment by Caltrans, the City understands USACE will immediately assign a permit to operate and maintain said relinquished federal portion shown as Segment 1. City also understands a perfection of title will be completed with USACE resulting in a final road easement to the City and no further action will be required by Caltrans within the relinquished portion; and
WHEREAS, Caltrans desires the City acknowledge the receipt and review of the Environmental Disclosure Memo (EDM): Relinquishment Rel-#509-S dated April 2, 2025 and Caltrans CEQA Determination from Categorically Exempt (CE) dated January 23, 2025; and WHEREAS, Caltrans is willing to make a lump sum payment to the City to satisfy its obligations set forth in the Cooperative Agreement; and WHEREAS, during the fund request of financial contribution (FCO) to CTC, Caltrans will include an additional 18.5% allocation, or $2,938,725 in addition to the original programmed amount of $15,885,000 for a total funding amount of $18,823,725.00.
WHEREAS, the City is willing to accept the Relinquished Property from Caltrans upon approval by the CTC of a Resolution of Relinquishment and Caltrans’ recording of said Resolution in the County Recorder’s Office as a means to fulfill its obligations under the Cooperative Agreement; and
248
RESOLUTION NO. 2025-090