City of Chino
5-Year Capital Improvement Program Budget
Fiscal Years 2026-27 through 2030-31
T
he City’s Capital Improvement Program (CIP) uses a structured numbering system to ensure every project is clearly identified, consistently categorized, and easy to track across the Five-Year planning period. An example of the numbering system for project number ST201would be as follows – the ST represents a category titled Street Projects, the 21 represents the FY20-21, in which the project was established and the 1 represents the first Street Project of the fiscal year. The categories and their abbreviations are listed as follows: Miscellaneous (MS), Parks (PK), Public Facilities (PF), Water (WA), Sewer (SW), Sanitation (SN), Storm Drain (SD), Streets (ST), Traffic (TR) and Reimbursements from outside agencies (R). The last page of the Five-Year CIP includes a section titled Reimbursements and Non-Capital Improvement Project Group. This Group represents projects that don’t meet the requirements to be classified as a Capital Improvement Project, but would like to be tracked along with all the CIP projects
T
he following schedules list the Four-Year Capital Improvement Program budget for Fiscal Years 2026-27 through 2030-31. The City’s Capital Improvement Program (CIP) budget consists of a wide range of projects that improve the community’s infrastructure and provide long-term benefit. Examples of such projects include construction and repair of roads and bridges, installation and upgrade of traffic signals, rehabilitation of water and sewer lines, construction and renovation of parks and City facilities, and installation of streetlights and sidewalks.

I
ncluded below is a brief description of the various schedules contained in the following pages:
• D
etailed Schedule of all Capital Improvement Projects: Listing of all projects by Groups, Category, and Project Number.

T
he CIP proposed budget for the 2026- 27 Fiscal Year includes a total commitment of approximately $3. 3 million of new projects, $23.2 million of additional funding for existing projects, and $111.7 million of carryover projects, which represents over 80 individual projects totaling approximately $138.2 million. Listed below are the categories of projects and the total amounts representing new funding and carry over funds for FY2026-27.

PAR
K PROJECTS $ 5,175,955 S TREET PROJECTS $ 24,489,096 PUBLIC FACILITY PROJECTS $ 3,405,412 T RAFFIC PROJECTS $ 6,775,373 SEWER PROJECTS $ 3,084,700 WATER PROJECTS $ 84,674,403 STORM DRAIN PROJECTS $ 6,640,463 SANITATION PROJECTS $ 3,938,515 T
he largest individual projects in terms of remaining budgeted dollars are:
• W ater Line Replacement – Russell Ave $ 7,568,803
• P ine Ave at SR71 Interchange Ramp Improvements $ 3,543,159 • Euclid Ave Bridge Project $ 2,754,859
• Merrill Ave Widening, Interconnect, and Euclid Median Improvements $ 737,754 • Alley Sanitation Rehab FY2022-23 – 12th St. $ 1,559,253 1 This page left intentionally blank.
2 Rev. 04/17/25 FY2026-27 PROPOSED 5-YEAR CAPITAL PROJECTS Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 ST203 Pine Ave. Improvements 2,035,646.41 2,035,646.41 1,989,284.19 1,989,284.19 320 Fund 260-Transfer-B/S/T Preserve DIF 1,713,857.19 1,713,857.19 14,736.00 1,699,121.19 1,699,121.19 100 Lewis Falloncrest Reimbursement-Fund 260-Transfer-B/S/T Preserve DIF 290,163.00 290,163.00 0.00 290,163.00 290,163.00 327 Fund 327 SB1- Road Maint Rehab Account 31,626.22 31,626.22 0.00 31,626.22 0.00 0.00 ST204 Pine Ave at SR71 Interchange Ramp Improvements 3,543,159.35 3,543,159.35 3,543,159.35 3,543,159.35 G7203 R 320 Caltrans Grant 1L370-SOP Project(1) 964,080.23 964,080.23 0.00 964,080.23 964,080.23 COMMITTED 320 Fund 100-Transfer-General Fund (3) 62,049.99 62,049.99 0.00 62,049.99 62,049.99 R 328 Fund 328-Measure I Arterial Funding-SBCTA-Reimbursement (2) 2,517,029.13 2,517,029.13 0.00 2,517,029.13 2,517,029.13 ST222 Kimball/El Prado/Central Traffic Improvements 436,594.47 436,594.47 0.00 COMMITTED 320 Fund 220 Transfer-B/S/T Citywide 150,000.00 150,000.00 0.00 150,000.00 0.00 Deferred RTFB 322 Fund 322- Measure I(2) 224,440.00 224,440.00 0.00 224,440.00 0.00 320 Fund 100-General Fund Transfer 62,154.47 62,154.47 0.00 62,154.47 0.00 ST232 Kimball Ave Preserve Improvements 932,542.39 932,542.39 0.00 Completed 320 Fund 260-Preserve BST 58,150.44 58,150.44 58,131.42 19.02 0.00 REIMB DUE R 540 Fund 540- Storm Drain Fund REIMB San Bern. County 403,501.50 403,501.50 0.00 403,501.50 0.00 327 Fund 327 SB1- Road Maint Rehab Account 434,736.32 434,736.32 34,736.32 400,000.00 0.00 322 Fund 322- Measure I 36,154.13 36,154.13 36,154.13 0.00 ST233 Yorba Ave Street Improvements-CVUSD 234,809.08 54,809.08 0.00 Completed 320 Fund 100-General Fund Transfer (4) 184,809.08 -180,000.00 4,809.08 4,353.39 455.69 0.00 320 Fund 220 Transfer-B/S/T Citywide (Developer: Yorba XC, LLC) (2) 0.00 0.00 0.00 0.00 320 Developer Contribution-On Acct (Developer: Yorba XC, LLC) (1) 0.00 0.00 0.00 0.00 327 Fund 327 SB1- Road Maint Rehab Account (3) 50,000.00 50,000.00 50,000.00 0.00 ST241 MV MV-Local Street Rehabilitation Project FY2024 770,464.85 361,464.85 295,257.52 0.00 Completed 320 Fund 100-General Fund Transfer (3) 540,675.37 -409,000.00 131,675.37 65,468.04 66,207.33 0.00 327 Fund 327 SB1- Road Maint Rehab Account (2) 0.00 0.00 0.00 0.00 322 Fund 322- Measure I (1) 229,789.48 229,789.48 229,789.48 0.00 ST242 College Park Roundabout Imp 102,000.00 163,000.00 0.00 Deferred RTFB 320 Fund 320-Transportation-HOA-Reimb 33% each-College Park & Chaffey College 0.00 0.00 0.00 0.00 200,000 322 Fund 322-Measure I (1) 102,000.00 102,000.00 0.00 102,000.00 0.00 320 Fund 100-General Fund Transfer(2) 0.00 61,000.00 61,000.00 0.00 61,000.00 0.00 ST243 MV MV-Euclid Ave Bridge Project 3,262,486.01 3,851,486.01 2,754,859.01 2,754,859.01 320 Fund 100-General Fund Transfer 3,262,486.01 589,000.00 3,851,486.01 1,096,627.00 2,754,859.01 2,754,859.01 5,528,038 TBD 103,407,000
ST244 Kimball Avenue Median Improvements Project-Reimb. Cty ARPA Funds 44,188.50 44,188.50 0.00 G7241 R 320 Fund 320-San Bernardino County ARPA Funds 44,188.50 44,188.50 0.00 44,188.50 0.00 Completed 320 Fund 100-General Fund Transfer 0.00 0.00 0.00 0.00 ST251 Citywide ADA Ramp Improvements 258,307.50 318,307.50 307.00 6,307.00 327 Fund 327 SB1- Road Maint Rehab Account (2) 0.00 0.00 0.00 0.00 0.00 322 Fund 322- Measure I (1) 258,307.50 60,000.00 318,307.50 318,000.50 307.00 6,000.00 6,307.00 320 Fund 100-General Fund Transfer 0.00 0.00 0.00 0.00
ST253 East End Railroad Improvements 35,000.00 44,700.00 44,700.00 44,700.00 322 Fund 322-Measure I (2) 0.00 0.00 0.00 0.00 0.00 265,400 320 Fund 220 Transfer- B/S/T Citywide DIF Developer Contribution(Alere) 35,000.00 9,700.00 44,700.00 0.00 44,700.00 44,700.00 ST260 Pavement Improvements Zone 1 647,500.00 647,500.00 647,500.00 327 Fund 327- RMRA 647,500.00 647,500.00 0.00 647,500.00 647,500.00 FY 2026-27 5-Year Capital Improvement Program
Transportation Group
Street Category
3 Rev. 04/17/25 FY2026-27 PROPOSED 5-YEAR CAPITAL PROJECTS Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 FY 2026-27 5-Year Capital Improvement Program
ST261 Pine Ave Connector/ Bridge Project 48,796.00 7,013,782.99 6,612,317.99 6,659,113.99 320 Fund 220 Transfer-B/S/T Citywide 48,796.00 48,796.00 2,000.00 46,796.00 0.00 0.00 220 Fund 220- B/S/T Citywide 2,086,590.28 2,086,590.28 70,533.00 2,016,057.28 46,796.00 2,062,853.28 G7261 R 320 Fund 320-SAFETEA-LU Grant 3,505,806.71 3,505,806.71 282,136.00 3,223,670.71 3,223,670.71 R 328 Fund 328-Measure I Arterial Funding 1,372,590.00 1,372,590.00 0.00 1,372,590.00 1,372,590.00 ST252 Cypress Ave Rehab 0.00 17,206.00 0.00
327 Fund 327 SB1- Road Maint Rehab Account (2) 0.00 0.00 0.00 0.00 322 Fund 322- Measure I (1) 0.00 17,206.00 17,206.00 17,206.00 0.00 320 Fund 100-General Fund Transfer 0.00 0.00 0.00 0.00
ST262 Benson Avenue Safe Routes to School Improvements 65,000.00 65,000.00 65,000.00 322 Fund 322- Measure I 20,150.00 20,150.00 0.00 20,150.00 20,150.00 G7264 R 321 Fund 321- TDA 44,850.00 44,850.00 0.00 44,850.00 44,850.00 ST263 Pavement Improvements (Zone 2) Edison & Chino Ave 200,000.00 188,000.00 4,588,000.00 322 Fund 322- Measure I 0.00 0.00 0.00 400,000.00 400,000.00 327 Fund 327- RMRA 200,000.00 200,000.00 12,000.00 188,000.00 4,000,000.00 4,188,000.00 ST270 NEW Pavement Improvements (Zone 3) 150,000.00
327 Fund 327- RMRA 150,000.00 150,000.00 3,000,000$
320 Fund 100-General Fund Transfer 0.00 1,000,000$
ST271 NEW ROW ADA Improvements FY2027 250,000.00
320 Fund 100-General Fund Transfer 250,000.00 250,000.00 R7200 MV Central Ave. St. Rte. 60 Improvements- REIMBURSEMENT 2,957,923.60 4,016,668.60 2,066,326.34 2,066,326.34 320 Fund 220 Transfer- B/S/T Citywide DIF 2,337,483.60 2,337,483.60 1,950,342.26 387,141.34 387,141.34 220 Fund 220- B/S/T Citywide DIF 988,803.00 988,803.00 0.00 988,803.00 988,803.00 320 Fund 260-Transfer- B/S/T Preserve DIF 0.00 0.00 0.00 0.00 0.00 320 Fund 100-General Fund Transfer 620,440.00 69,942.00 690,382.00 0.00 690,382.00 690,382.00 320 City of Montclair Reimb. at end of project 0.00 0.00 0.00 0.00 0.00 320 County of San Bernardino Reimburse at end of project 0.00 0.00 0.00 0.00 0.00 R7231 Chino Hills Parkway Pavement Rehabilitation-CO-OP Reimbursement Agreement 13.5% Share 987,091.50 987,091.50 987,091.50 987,091.50 322 Fund 322-Measure I 987,091.50 987,091.50 0.00 987,091.50 987,091.50 327 Fund 327 - RMRA 0.00 0.00 0.00 0.00 0.00
R2501 Merrill Ave. Widening, Interconnect, and Euclid Ave. Median Improvements 4,716,226.23 7,377,543.23 6,639,788.91 737,754.32 737,754.32 320 Fund 320- Scannell Deposit 320-35335 0.00 0.00 0.00 0.00 0.00 320 Fund 220 Transfer- B/S/T Citywide DIF 0.00 2,322,542.00 2,322,542.00 2,090,287.80 232,254.20 232,254.20 320 Fund 260-Transfer- B/S/T Preserve DIF 4,716,226.23 338,775.00 5,055,001.23 4,549,501.11 505,500.12 505,500.12 TBD Pavement Improvements (Zone 4)
100 Fund 100 -General Fund Transfer 5,000,000
TBD Pavement Improvements (Zone 1)
100 Fund 100 -General Fund Transfer 5,000,000
20,365,235.89 778,200.00 10,967,254.99 32,110,690.88 17,817,048.88 1,592,388.73 19,636,299.70 4,852,796.00 24,489,096 9,465,400 113,935,038 0 0Street Category Totals 4 Rev. 04/17/25 FY2026-27 PROPOSED 5-YEAR CAPITAL PROJECTS Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 FY 2026-27 5-Year Capital Improvement Program
TR131 Traffic Signal Modifications- Riverside @ Ramona 23,566.00 23,566.00 23,566.00 1,380,174.00 320 Fund 100 -General Fund Transfer 0.00 0.00 0.00 0.00 0.00 320 Fund 220 Transfer-B/S/T Citywide 0.00 0.00 0.00 0.00 0.00 322 Fund 322-Measure I 23,566.00 23,566.00 0.00 23,566.00 1,356,608.00 1,380,174.00 TR171 TSM- Grand Spectrum/East & West Paving-Pipeline/Roswell 118,045.80 118,045.80 0.00 COMMITTED 322 Fund 322-Measure I(1) 0.00 0.00 0.00 0.00 Completed 320 Fund 100 - General Fund Transfer(2) 118,045.80 118,045.80 0.00 118,045.80 0.00 TR212 Traffic Signal Install - Monte Vista and Walnut 342,124.50 3,527,257.50 3,517,882.50 3,517,882.50 COMMITTED 322 Fund 322 - Measure I 0.00 509,000.00 509,000.00 0.00 509,000.00 509,000.00 320 Fund 100-General Fund Transfer 46,095.00 46,095.00 0.00 46,095.00 46,095.00 320 Fund 220-Citywide DIF Transfer 296,029.50 900,000.00 1,196,029.50 9,375.00 1,186,654.50 1,186,654.50 327 Fund 327-RMRA 1,776,133.00 1,776,133.00 0.00 1,776,133.00 1,776,133.00 TR213 Traffic Signal Install - Merrill and Hellman-Reimbursement 390,000.00 390,000.00 390,000.00 390,000.00 320 Fund 260- BST Preserve 390,000.00 390,000.00 0.00 390,000.00 390,000.00 TR221 CCTV Camera Installation Phase 3 2,196.79 2,196.79 0.00 Completed 322 Fund 322-Measure I 2,196.79 2,196.79 0.00 2,196.79 0.00 TR240 Traffic Signal Modification- Eucalyptus & Fern 143,686.74 143,686.74 0.00 Completed 320 Fund 220-Citywide DIF Transfer (3) 143,686.74 143,686.74 63,141.69 80,545.05 0.00 320 Fund 320-Developer Fair Share Contribution (2) 0.00 0.00 0.00 0.00 320 Fund 320-Transportation-Remediation Settlement Agreement (1) 0.00 0.00 0.00 0.00 322 Fund 322-Measure I (1) 0.00 0.00 0.00 0.00
TR250 CCTV Camera Installation Phase 4 225,000.00 225,000.00 225,000.00 227,196.00 322 Fund 322-Measure I 225,000.00 225,000.00 0.00 225,000.00 2,196.00 227,196.00 TR251 FY25 Traffic Signal Interconnect Project 254,968.02 254,968.02 0.00 Completed 320 Fund 220-Citywide DIF Transfer 249,950.00 249,950.00 0.00 249,950.00 0.00 322 Fund 322 - Measure I 5,018.02 5,018.02 4,999.05 18.97 0.00 TR260 FY26 Traffic Signal Interconnect 143,500.00 143,500.00 143,500.00 322 Fund 322 - Measure I 143,500.00 143,500.00 0.00 143,500.00 143,500.00 TR261 MV Pedestrian Improvements-Yorba @ Walnut 571,120.00 571,120.00 571,120.00 322 Fund 322 Measure I 377,520.00 377,520.00 0.00 377,520.00 377,520.00 320 Fund 100 - General Fund Transfer 193,600.00 193,600.00 0.00 193,600.00 193,600.00 TR262 Central Avenue Traffic Signal Safety Improvements 250,500.00 250,500.00 250,500.00 G7262 326 Fund 326- HSIP 225,450.00 225,450.00 0.00 225,450.00 225,450.00 322 Fund 322 - Measure I 25,050.00 25,050.00 0.00 25,050.00 25,050.00 TR270 NEW FY27 Traffic Signal Interconnect 145,000.00
322 Fund 322 - Measure I 145,000.00 145 ,000.00
TR271 NEW Intersection Improvements - Moonspinner St at West Preserve Loop 150,000.00 320 Fund 100 - General Fund Transfer 50,000.00 50 ,000.00 322 Fund 322 - Measure I 100,000.00 100 ,000.00
TBD Traffic Signal Mod. - Central Ave/Eucalyptus Ave.
322 Fund 322- Measure I 300,000$
1,499,587.85 4,150,253.00 0.00 5,649,840.85 77,515.74 450,756.61 5,121,568.50 1,653,804.00 6,775,373 300,000 0 0 0 21,864,823.74 4,928,453 10,967,255 37,760,532 17,894,565 2,043,145 24,757,868 6,506,600 31,264,468 9,765,400 113,935,038 0 0 Traffic Category
Traffic Category Totals
Transportation Group Total
5 Rev. 04/17/25 FY2026-27 PROPOSED 5-YEAR CAPITAL PROJECTS Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 FY 2026-27 5-Year Capital Improvement Program
WA211 Well 11 Pipeline Project 76,542.72 76,542.72 75,906.72 75,906.72 520 Fund 520-Water Fund 76,542.72 76,542.72 636.00 75,906.72 75,906.72 WA212 State Street Water Treatment Project-Need FB to PW 57,076,610.14 57,076,610.14 55,146,503.14 55,146,503.14 G7211 R 520 Federal Grant -Water SMART BOR-DO-20-F002 750,000.00 750,000.00 0.00 750,000.00 750,000.00 R 520 Fund 520-Water Fund DW SRF Loan #2 38,708,159.00 -25,000,000.00 13,708,159.00 0.00 13,708,159.00 13,708,159.00 520 Fund 520-Water Fund 15,618,451.14 15,618,451.14 0.00 15,618,451.14 15,618,451.14 G7263 R 520 Fund 520-Water Fund Emerging Contaminates Grant 0.00 25,000,000.00 25,000,000.00 1,930,107.00 23,069,893.00 23,069,893.00 G7252 R 520 Norma Torres County Funding-PENDING AWARD LETTER 2,000,000.00 2,000,000.00 0.00 2,000,000.00 2,000,000.00 WA213 Benson Reservoir 3 (1.5mg) Improvement Project 4,268,107.45 4,268,107.45 3,796,148.95 3,796,148.95 520 Fund 520- Water Fund 4,268,107.45 4,268,107.45 471,958.50 3,796,148.95 3,796,148.95 13,500,222 WA214 Well 17 Equipping Project 5,600,837.64 5,600,837.64 5,528,447.64 5,528,447.64 520 Fund 520-Water Fund 5,600,837.64 5,600,837.64 72,390.00 5,528,447.64 5,528,447.64 WA223 Water Main Line Replacement- Russell Ave 890,155.00 926,155.00 846,155.00 7,568,803.00 520 Fund 520-Water Fund 690,155.00 690,155.00 0.00 690,155.00 6,430,648.00 7,120,803.00 322 Fund 322- Measure I 120,000.00 36,000.00 156,000.00 0.00 156,000.00 292,000.00 448,000.00 530 Fund 530- Sewer Fund 80,000.00 80,000.00 0.00 80,000.00 0.00 0.00 WA224 MV Water Main Replacement - B St Alley 1,569,264.00 2,134,264.00 2,134,264.00 2,134,264.00 520 Fund 520- Water Fund 1,569,264.00 1,569,264.00 0.00 1,569,264.00 1,569,264.00 320 Fund 100-General Fund Transfer 565,000.00 565,000.00 0.00 565,000.00 565,000.00 WA231 Well 4 & 6 Treatment Plant Project 92,717.25 92,717.25 0.00 Cancelled 520 Fund 520- Water Fund 92,717.25 92,717.25 0.00 92,717.25 0.00 550 Fund 550-Sanitation Fund
WA234 Well 16 Upgrade Project 161,613.69 1,136,320.69 932,209.19 932,209.19 520 Fund 520- Water Fund 161,613.69 774,707.00 936,320.69 204,111.50 732,209.19 732,209.19 261 Fund 261- Preserve Water 200,000.00 200,000.00 0.00 200,000.00 200,000.00 WA241 Phillips Reservoir 2 Demo 487,472.00 487,472.00 0.00 520 Fund 520- Water Fund 487,472.00 487,472.00 0.00 487,472.00 0.00 500,000 3,505,000 3,505,000 WA242 Water Main Replacement Philadelphia & Walnut 1,008,843.82 1,008,843.82 908,956.82 5,492,120.82 520 Fund 520-Water Fund 1,008,843.82 1,008,843.82 99,887.00 908,956.82 4,583,164.00 5,492,120.82 WA253 Emergency Power Plant Supply Study 500,000.00 500,000.00 500,000.00 500,000.00 520 Fund 520-Water Fund 500,000.00 500,000.00 0.00 500,000.00 500,000.00 WA255 Water Service Lateral Replacement in Hampshire Village 1,829,102.00 1,829,102.00 0.00 Completed 520 Fund 520-Water Fund 1,829,102.00 1,829,102.00 694,112.69 1,134,989.31 0.00 WA260 Water Main Replacement- Central Ave- C St to Riverside Dr 200,000.00 200,000.00 2,000,000.00 520 Fund 520-Water Fund 200,000.00 200,000.00 0.00 200,000.00 1,800,000.00 2,000,000.00 WA270 NEW SCADA System Upgrade 1,500,000.00
520 Fund 520-Water Fund 1,500,000.00 1,500,000.00
TBD SCADA System Upgrade (Phase 2)
520 Fund 520-Water Fund 3,055,300
Enterprise Group
Water Category
6 Rev. 04/17/25 FY2026-27 PROPOSED 5-YEAR CAPITAL PROJECTS Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 FY 2026-27 5-Year Capital Improvement Program
TBD Portable Emergency Generator for the Groundwater Sites 520 Fund 520-Water Fund 2,402,000
TBD Benson Water Treatment Facility Emergency Power Generator Project- Design 520 Fund 520-Water Fund 483,000 4,070,000
TBD Emergency Generator Connection & Pad State St Water Treatment Facility 520 Fund 520-Water Fund 620,000 2,100,000
TBD 790 Booster Pumps
520 Fund 520-Water Fund 500,000 5,100,000
TBD Benson Ave Treatment Plant
520 Fund 520-Water Fund 300,000
TBD Phillips 980 Booster Pumps (EWTF)
520 Fund 520-Water Fund 300,000 2,200,000
TBD Reservoir 4 Rehabilitation Phillips
520 Fund 520-Water Fund 2,737,940 600,000 600,000
TBD Pipeline Replacement Program - Phase I
520 Fund 520-Water Fund 550,000 4,000,000
TBD Pipeline Replacement Program - Phase II
520 Fund 520-Water Fund 600,000
TBD Phillips Generator Installation
520 Fund 520-Water Fund 602,000 3,100,000
TBD Water Main Replacement C St to Walnut Ave
520 Fund 520-Water Fund 500,000 2,500,000
73,561,265.71 801,000.00 974,707.00 75,336,972.71 3,473,202.69 1,795,178.56 70,068,591.46 14,605,812.00 84,674,403 26,350,462 27,475,000 4,105,000 0 SW201 Preserve Lift Station Expansion & Improvement Project- DEV.REIMBURSEMENT 853,987.74 853,987.74 0.00 Completed 530 Fund 262 Transfer- Preserve Sewer DIF Fund 0.00 0.00 0.00 0.00 530 Fund 530 Sewer Fund 853,987.74 853,987.74 0.00 853,987.74 0.00 SW260 530 Sewer Rehab FY26 2,000,000.00 2,000,000.00 2,884,700.00 Fund 530 - Sewer Fund 2,000,000.00 2,000,000.00 0.00 2,000,000.00 884,700.00 2,884,700.00 SW270 NEW 530 Sewer Rehab FY27 200,000.00
Fund 530 - Sewer Fund 200,000.00 200,000.00
TBD Sewer Rehab FY2025-26 Walnut Ave-Benson to Oaks, Walnut Ave- Oaks to Magnolia 530 Funding TBD from Sewer Fund and or DIF 1,038,125
TBD Sewer Rehab FY2026- Grand Ave-Pipeline to Roswell, Roswell Ave-Grand Ave to Schaefer 530 Funding TBD from Sewer Fund and or DIF 1,543,125 1,543,125 1,543,125 853,987.74 2,000,000.00 0.00 2,853,987.74 0.00 853,987.74 2,000,000.00 1,084,700.00 3,084,700 2,581,250 1,543,125 1,543,125 0Sewer Category Totals Water Category Totals
Sewer Category
7 Rev. 04/17/25 FY2026-27 PROPOSED 5-YEAR CAPITAL PROJECTS Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 FY 2026-27 5-Year Capital Improvement Program
SD222 Storm Drain Rehab FY2021-22-Philadelphia/Monte Vista to Marshall Elementary 50,009.50 50,009.50 50,009.50 50,009.50 540 Fund 540-Storm Drain 50,009.50 50,009.50 0.00 50,009.50 50,009.50 3,513,056 530 Fund 530-Sewer Fund 171,950
540 Fund 100 Transfer - General Fund 290,819
SD231 Catch Basin Trash Capture Retrofit 329,950.00 329,950.00 329,950.00 329,950.00 540 Fund 540-Storm Drain 329,950.00 329,950.00 0.00 329,950.00 329,950.00 SD240 Euclid Avenue Storm Drain Extension Line I 1,712,617.98 1,712,617.98 1,689,502.98 1,689,502.98 540 Fund 263 Transfer-Storm Drain Preserve DIF 1,712,617.98 1,712,617.98 23,115.00 1,689,502.98 1,689,502.98 Funding TBD 23,000,000
SD251 Storm Drain Rehab FY2024-25-Francis Ave./Norton to Monte Vista 0.00 0.00 540 Fund 540-Storm Drain 0.00 0.00 0.00 2,875,400 2,875,400 SD260 Catch Basin Trash Capture Retrofit- Phase 2 500,000.00 500,000.00 500,000.00 540 Fund 540 Storm Drain Fund 500,000.00 500,000.00 0.00 500,000.00 500,000.00 SD270 NEW Catch Basin Trash Capture Retrofit- Phase 3 500,000.00 540 Fund 540 Storm Drain Fund 500,000.00 500,000.00
R8001 San Antonio Ave Regional Storm Drain CO-OP (CITY REIMB TO ONT.) 3,571,047.18 3,576,047.18 3,571,000.18 3,571,000.18 540 Fund 540- Storm Drain Fund 2,071,047.18 2,071,047.18 47.00 2,071,000.18 2,071,000.18 530 Fund 530-Sewer Fund 1,500,000.00 1,500,000.00 0.00 1,500,000.00 1,500,000.00 520 Fund 520- Water Fund 5,000.00 5,000.00 0.00 5,000.00 0.00 0.00 5,663,624.66 505,000.00 0.00 6,168,624.66 23,162.00 5,000.00 6,140,462.66 500,000.00 6,640,463 26,975,825 2,875,400 2,875,400 0 SN221 MV MV-FY22 Alley Rehab /Alley 20 1,539,762.84 3,117,234.84 2,305,334.84 2,305,334.84 550 Fund 550-Sanitation Fund 898,528.84 898,528.84 5,900.00 892,628.84 892,628.84 320 Fund 100 Transfer-General Fund 641,234.00 771,472.00 1,412,706.00 0.00 1,412,706.00 1,412,706.00 520 Fund 520- Water Fund 806,000.00 806,000.00 0.00 806,000.00 0.00 0.00 SN231 Alley/Sanitation Rehab FY2022-23-12th St 1,559,252.70 1,559,252.70 1,559,252.70 1,559,252.70 550 Fund 550-Sanitation Fund 376,606.20 376,606.20 0.00 376,606.20 376,606.20 550 Fund 550-Sanitation Fund (Waste Mgmt. Cont) 489,646.50 489,646.50 0.00 489,646.50 489,646.50 320 Fund 100 Transfer-General Fund 0.00 0.00 0.00 0.00 0.00 520 Fund 520- Water Fund 693,000.00 693,000.00 0.00 693,000.00 693,000.00 SN240 Alley/Improvements FY23-24 432,911.55 482,933.50 73,927.81 73,927.81 R 350 Fund 350- CDBG 432,911.55 31,500.00 464,411.55 408,257.25 56,154.30 56,154.30 320 Fund 100 Transfer-General Fund 18,521.95 18,521.95 748.44 17,773.51 17,773.51 3,531,927.09 1,577,472.00 50,021.95 5,159,421.04 414,905.69 806,000.00 3,938,515.35 0.00 3,938,515.35 0 0 0 0 83,610,805.20 4,883,472.00 1,024,728.95 89,519,006.15 3,911,270.38 3,460,166.30 82,147,569.47 16,190,512.00 98,338,081 55,907,537 31,893,525 8,523,525 0 Storm Drain Category
Storm Drain Category Totals
Sanitation Category
Sanitation Category Total
Grand Total Enterprise Group
8 Rev. 04/17/25 FY2026-27 PROPOSED 5-YEAR CAPITAL PROJECTS Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 FY 2026-27 5-Year Capital Improvement Program
PK223 MV MV-Walnut Park Playground Improvements-Surface/Shade/Equip 787,803.45 787,803.45 714,009.27 2,000,000.27 G8223 R 340 The Natural Resource Agency Dept Grant 43,863.16 43,863.16 0.00 43,863.16 43,863.16 COMMITTED 340 Fund 100- General Fund Transfer 743,940.29 743,940.29 73,794.18 670,146.11 1,285,991.00 1,956,137.11 PK234 Carolyn Owens Comm Center Demonstration Garden- 480,983.85 480,983.85 440,763.50 1,440,000.50 340 Fund 100- General Fund Transfer 0.00 0.00
340 Fund 520- Water Fund Transfer 319,656.85 319,656.85 40,220.35 279,436.50 0.00 279,436.50 520 Fund 520- Water Fund 161,327.00 161,327.00 0.00 161,327.00 999,237.00 1,160,564.00 PK252 ADJ MV MV-Carolyn Owens Community Center Playground Project 0.00 75,000.00 36,095.00 36,095.00 340 Fund 100- General Fund Transfer 0.00 75,000.00 75,000.00 38,905.00 36,095.00 36,095.00 1,063,905 PK253 Glen E. Duncan Splash Pad 87,752.50 999,752.50 989,752.50 989,752.50 340 Fund 341-Transfer- Park Fund Preserve 87,752.50 912,000.00 999,752.50 10,000.00 989,752.50 989,752.50 PK255 ADJ Monte Vista Park Expansion 0.00 351,499.01 329,749.01 329,749.01 350 Fund 350- CDBG 0.00 351,499.01 351,499.01 21,750.00 329,749.01 329,749.01 340 Fund 100- General Fund Transfer 0.00 0.00 437,920
PK261 MV MV-Heritage Park Improvements 0.00 273,680.00 205,260.00 205,260.00 340 Fund 100- General Fund Transfer 0.00 100,000.00 173,680.00 273,680.00 68,420.00 205,260.00 0.00 205,260.00 5,000,000 PK262 MV Shady Grove Improvements Project 0.00 233,464.00 175,098.00 175,098.00 340 Fund 100- General Fund Transfer 0.00 100,000.00 133,464.00 233,464.00 58,366.00 175,098.00 175,098.00 5,500,000 PK256 ADJ Ayala Park Playground & South Picnic Replacement Project 0.00 0.00 340 Fund 100- General Fund Transfer 0.00 0.00 1,600,000 TBD Liberty Park Playground Improvements 0.00 0.00
340 Fund 100- General Fund Transfer 0.00 0.00 0.00 300,000 3,500,000 TBD MV Ayala Park Improvements-APOC 0.00 0.00
ADJ 340 Fund 100- General Fund Transfer 0.00 0.00 1,360,000 TBD Ayala Park Improvements-Path of Travel Accessibility 0.00 0.00 ADJ 340 Fund 100- General Fund Transfer 0.00 0.00 1,061,000 TBD Villa Park Improvement Project
340 Fund 100- General Fund Transfer 300,000 3,500,000 TBD Monte Vista Park Improvement Project
340 Fund 100- General Fund Transfer 300,000
TBD Mountain View Park Improvement Project
340 Fund 100- General Fund Transfer 300,000
TBD Cypress Trails Park Improvement Project
340 Fund 100- General Fund Transfer 300,000 3,500,000
1,356,539.80 1,538,499.01 307,144.00 3,202,182.81 311,455.53 0.00 2,890,727.28 2,285,228.00 5,175,955.28 2,401,825 17,800,000 6,221,000 1,600,000 Special Revenue Group
Parks Category
Parks Category Totals
9 Rev. 04/17/25 FY2026-27 PROPOSED 5-YEAR CAPITAL PROJECTS Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 FY 2026-27 5-Year Capital Improvement Program
PF210 City Hall & City Hall South Interior and Accessibility Improvements 2,053,665.83 2,053,665.83 1,553,665.83 1,553,665.83 COMMITTED 650 Fund 650 - Building Management Fund 0.00 0.00 0.00 0.00 0.00 650 Fund 100 General Fund Transfer 2,053,665.83 2,053,665.83 500,000.00 1,553,665.83 1,553,665.83 PF233 MV Cultural Arts Building- Purchase of Property 0.00 0.00 Completed 650 Fund 100- General Fund Transfer 0.00 0.00 PF234 Police Dept. Solar Project- Finance Project 25,952.00 25,952.00 0.00 Completed 650 Fund 650 - Building Management Fund 25,952.00 25,952.00 25,199.50 752.50 0.00 PF261 MV MV-Youth Museum Interior Improvements 161,368.00 66,026.00 66,026.00 650 Fund 100- General Fund Transfer 100,000.00 61,368.00 161,368.00 40,342.00 55,000.00 66,026.00 0.00 66,026.00 PF262 Channel 3 Production $ Film Studio 75,000.00 0.00 Move to PF264 650 Fund 650 - Backfill with Fund 345 PEG Fund 75,000.00 75,000.00 0.00 75,000.00 0.00 PF263 MV MV-Central Plant Replacement 150,000.00 107,920.00 442,920.00 650 Fund 100- General Fund Transfer 150,000.00 150,000.00 42,080.00 107,920.00 335,000.00 442,920.00 10,000,000 PF264 MV MV-Epic Facility (The Lab) Rehab 247,500.00 117,800.00 892,800.00 100 Fund 100- General Fund 37,500.00 37,500.00 37,500.00 0.00 0.00 650 Fund 100- General Fund Transfer 150,000.00 150,000.00 32,200.00 117,800.00 117,800.00 650 Fund 660- Equipment Management Transfer 700,000.00 700,000.00 610 Fund 610- Central Services Fund 60,000.00 60,000.00 60,000.00 0.00 0.00 345 Fund 345- PEG Funding 75,000.00 75,000.00
PF265 MV MV-Civic Center Paint Project/Design 50,000.00 40,000.00 50,000.00 650 Fund 100- General Fund Transfer 50,000.00 50,000.00 10,000.00 40,000.00 10,000.00 50,000.00 PF270 NEW Cultural Arts Building Rehab. 100,000.00
650 Fund 100- General Fund Transfer 100,000.00 100,000.00 PF271 Community Building Improvements- Interior 0.00
650 Fund 100- General Fund Transfer 0.00 0.00 200,000 2,000,000 PF272 NEW Community Building Improvements- Exterior (Include Liberty Courtyard & Playground) 300,000.00 650 Fund 100- General Fund Transfer 69,202.00 69,202.00 R 350 Fund 350- CDBG Fund 230,798.00 230,798.00
2,079,617.83 525,000.00 158,868.00 2,763,485.83 747,321.50 130,752.50 1,885,411.83 1,520,000.00 3,405,411.83 200,000 2,000,000 10,000,000 0 3,436,158 2,063,499 466,012 5,965,669 1,058,777 130,753 4,776,139 3,805,228 8,581,367 2,601,825 19,800,000 16,221,000 1,600,000 108,911,787 11,875,424 12,457,996 133,245,207 22,864,612 5,634,064 111,681,577 26,502,340 138,183,917 68,274,762 165,628,563 24,744,525 1,600,000Grand Total All Groups Public Facilities Category
Public Facilities Category Totals
Special Revenue Group Totals
10 Project Rev. 04/17/25 Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 ST163 Edison Ave. Improvements Lennar- College Park 4,830,775.57 4,830,775.57 4,830,775.57 4,830,775.57 101 Fund 101-Successor Agency Admin Cost 0.00 0.00 0.00 0.00 0.00 328 Fund 328- Measure I Arterial Subprogram 0.00 0.00 0.00 0.00 0.00 320 Fund 220-Citywide DIF YE Transfer 4,830,775.57 4,830,775.57 0.00 4,830,775.57 4,830,775.57 327 Fund 327 RMRA 0.00 0.00 0.00 0.00 0.00
401 Fund 401- Successor Agency-Admin 0.00 0.00 0.00 0.00 0.00 703 Fund 703- Retirement Obligation 0.00 0.00 0.00 0.00 0.00 4,830,775.57 0.00 0.00 4,830,775.57 0.00 0.00 4,830,775.57 0.00 4,830,776 0 0 0 0 R7250 Chino Airport Driveway Improvement Project 163,685.00 163,685.00 0.00 320 Fund 320-Transportation Fund- San Bern. County Reimbursement 163,685.00 163,685.00 163,685.00 0.00 0.00 163,685.00 0.00 0.00 163,685.00 163,685.00 0.00 0.00 0.00 0.0 0000 0 MS191 MV Traffic Signal Cabinet Project-5thYear of a 5Yr Program 329,686.28 329,686.28 0.00 Completed 320 Fund 100- General Fund Transfer 329,686.28 329,686.28 107,608.04 222,078.24 0.00 MS201 Water Master Plan/GIS Conversion Project 261,945.84 261,945.84 0.00 Closed 520 Fund 520 - Water Fund 261,945.84 261,945.84 0.00 261,945.84 0.00 MS211 Sewer Master Plan Update 105,769.85 105,769.85 0.00 Closed 530 Fund 530- Sewer Fund 105,769.85 105,769.85 105,769.85 0.00 MS212 Pavement Management System Software Project 34,851.00 34,851.00 0.00 Closed 327 Fund 327 - RMRA 34,851.00 34,851.00 34,851.00 0.00 MS215 City Facilities Fiber & Conduit Installation Project 200,000.00 140,000.00 140,000.00 140,000.00 320 Fund 100- Transfer- General Fund 0.00 0.00 0.00 0.00 0.00 610 Fund 610- Central Services Fund 200,000.00 -60,000.00 140,000.00 0.00 140,000.00 140,000.00 MS221 Citywide Signage Project 221,352.90 221,352.90 0.00 Completed 327 Fund 327 SB1- Road Maint Rehab Account 221,352.90 221,352.90 221,352.90 0.00 MS232 Chino Spectrum Traffic Study 31,082.44 31,082.44 31,082.44 31,082.44 322 Fund 322- Measure I 31,082.44 31,082.44 0.00 31,082.44 31,082.44 MS233 Citywide Telecommunications Master Plan 0.00 0.00 Hold 322 Fund 322- Measure I 0.00 0.00 50,000
MS236 MV MV-Traffic Signal Synchronization 161,160.00 161,160.00 161,160.00 161,160.00 320 Fund 100 Transfer -General Fund 20,000.00 20,000.00 20,000.00 20,000.00 322 Fund 322- Measure I 141,160.00 141,160.00 141,160.00 141,160.00 MS251 Citywide Storm Drainage Master Plan Update 500,000.00 500,000.00 500,000.00 500,000.00 540 Fund 255 Transfer-Storm Drain DIF 500,000.00 500,000.00 500,000.00 500,000.00 MS260 Urban Forest Management Plan 250,000.00 240,000.00 240,000.00 100 Fund 100- General Fund 250,000.00 250,000.00 10,000.00 240,000.00 240,000.00 MS262 Animal Resource Center 462,975.67 2,451,999.67 0.00 2,076,224.00 100 Fund 100- General Fund 462,975.67 1,920,000.00 69,024.00 2,451,999.67 2,451,999.67 0.00 2,076,224.00 2,076,224.00 Non-Capital - Reimbursements - Misc. Project Group
FY 2026-27 Non-Capital - Reimbursement - Misc. Projects Successor Agency Projects-Information Only
RDA-ROPS Project
Successor Agency Project Category
Grand Total Successor Agency Category Total
Reimbursement Project Category
Reimbursement Category Totals
Non-Capital Improvement Project Category
11 Project Rev. 04/17/25 Act CA New Addl CA Total Est Exp Return to FB Est CA New Total FY FY FY FY Number Fund Project Description 2024-25 2025-26 2025-26 2025-26 2025-26 2025-26 2025-26 2026-27 2026-27 2027-28 2028-29 2029-30 2030-31 FY 2026-27 Non-Capital - Reimbursement - Misc. Projects MS263 Chino Ford Freeway Sign 288,192.00 0.00
100 Fund 100- General Fund 288,192.00 288,192.00 288,192.00 0.00 MS264 Purchase of 6th St Property 1,097,114.42 1,097,114.42 0.00 100 Fund 100- General Fund 1,097,114.42 1,097,114.42 1,071,795.00 25,319.42 0.00 MS265 Relinquishment of Euclid Ave State Route 83 60,000.00 10,000.00 10,000.00 100 Fund 100- General Fund 60,000.00 60,000.00 50,000.00 10,000.00 10,000.00 MS266 Chino Comprehensive Safety Action Plan 500,000.00 500,000.00 500,000.00 G7265 320 Fund 320-Transportation Fund Grant 400,000.00 400,000.00 0.00 400,000.00 400,000.00 322 Fund 322- Measure I 100,000.00 100,000.00 0.00 100,000.00 100,000.00 MS267 13272 6th St. Property Purchase 2,511,000.00 0.00 0.00 100 Fund 100- General Fund 2,511,000.00 2,511,000.00 2,511,000.00 0.00 0.00 MS271 NEW Citywide Waterline Condition Assessment 300,000.00 520 Fund 520- Water Fund 300,000.00 300,000.00
MS273 NEW Citywide Water Meter Replacement 2,210,300.00 520 Fund 520-Water Fund 2,210,300.00 2,210,300.00
MS274 NEW Traffic Control Capital Replacement FY2027- Euclid Ave 200,000.00 100 Fund 100- General Fund 200,000.00 200,000.00
NC221 PD Handheld Radio Replacement Project- 2 OF 5 Year Replacement 424,344.15 550,677.10 126,332.95 126,332.95 660 Fund 660 - Equipment Management Fund 424,344.15 126,332.95 550,677.10 424,344.15 126,332.95 126,332.95 NC222 PD Vehicle Radio Replacement Project 3 OF 5 Year Replacement 160,709.93 394,020.73 73,085.54 73,085.54 660 Fund 660 - Equipment Management Fund 160,709.93 160,440.00 72,870.80 394,020.73 320,935.19 73,085.54 73,085.54 NC251 MV MV-Citywide Slurry FY2025 2,089,552.00 2,072,346.00 804,044.00 804,044.00 320 Fund 100 - General Fund 1,268,302.00 1,268,302.00 1,268,302.00 0.00 0.00 322 Fund 322- Measure I 281,250.00 -17,206.00 264,044.00 0.00 264,044.00 264,044.00 327 Fund 327- RMRA 540,000.00 540,000.00 0.00 540,000.00 540,000.00 NC252 Water Operational Improvements 481,000.00 531,000.00 0.00 Closed 520 Fund 520- Water Fund 481,000.00 50,000.00 531,000.00 0.00 531,000.00 0.00 NC831 Fire Station #1 Demo and Landscape Project 0.00 0.00 Hold 650 Fund 100 General Fund Transfer 0.00 0.00 92,920 372,080 ST173 Transportation ROW ADA Improvements 157,451.13 157,451.13 0.00 0.00 COMMITTED 320 Fund 100 Transfer-General Fund 157,451.13 157,451.13 0.00 157,451.13 0.00 0.00 Closed
TBD MV MV-Arterial Street Landscape Plan & Entry Monuments Branding 100 Fund 100 - General Fund 250,000
MS272 MV MV-Pavement Management Inventory Update
100 Fund 100 - General Fund 250,000
6,718,996 2,728,632 3,202,022 12,649,649 8,504,176 1,559,768 2,585,705 4,786,524 7,372,229 642,920 0 372,080 0 $11,713,456 $2,728,632 $3,202,022 $17,644,110 $8,667,861 $1,559,768 $7,416,481 $4,786,524 $12,203,005 $642,920 $0 $372,080 $0 Non-Capital Improvement Category Totals
Grand Total of Reimbursement and Non-Capital Projects
12