Cities Index.
Draft 26-67 User Fee Schedule

Chino City Council
July 21, 2026

Document
Draft 26-67 User Fee Schedule
Meeting
July 21, 2026
Body
Chino City Council
Original file
4.4 MB
Text extracted from the city's file for reading and search. Open the original on chino.legistar1.com. That file is the official record.

Administration
# Service Center #Service Center Name Base Fee/SubcategoryUnit Notes 2026 Fee 1 City Code Update Subscriptions Cost Of Printed Update Material $0.00 2 ADM-09100 City Code Books $0.00
3 ADM-10100 Administrative Decision Appeal
Hearings Requiring More Than One Hour
Of Staff Time -- Basic Fee Plus Actual Costs,
Including Hearing Officer
271
4 For Non-Applicant Filing Appeal 0
5 ADM-10200 Document Printing Maximum Allowable
Under Public Records Act Actual Cost
6 ADM-10400Document Certification Fee $17.00
7 ADM-05200 Duplication Of Public Records Page Or = To 10 Pages - Free 1st Rpt To Victim - Free (Crime Reports Only) $0.00
8 Cost of device CD R $1.00
9 Cost of device Flash Drive 8 GB $5.00
10 Cost of device Flash Drive 16 GB $8.00
11 Cost of device Flash Drive 32 GB $10.00
12 Cost of device Flash Drive 64 GB $13.00
13 Cost of device Flash Drive 128 GB $26.00
14 Cost of device 1 TB External Drive $73.00
User Fee Schedule Effective 7/1/26 (Highlighted fees will be effective if approval by Council 7-21-26) 1 Finance
#
Service Center
# Service Center Name Base Fee/Subcategory Unit Notes 2026 Fee 1 FIN-07500 Temporary Hydrant Meter Rental Per Rental
Deposit Required For Cost Of Meter
Replacement And Estimated Water Usage -
Residential $900; Commercial $2,000$305.00
2 Temporary Hydrant Meter Rental - Residential Deposit Deposit Required For Cost Of Meter
Replacement And Estimated Water Usage -
Residential $900; Commercial $2,000$922.00
3 Temporary Hydrant Meter Rental - Commercial Deposit Deposit Required For Cost Of Meter
Replacement And Estimated Water Usage -
Residential $900; Commercial $2,000$2,048.00
4 FIN-07700 Requested Meter Test Plus Actual Cost Of Outside Service$282.00 5 FIN-07800 Water Turn-On Service Fee $50.00
6 FIN-08000 Delinquency Notification Base Fee $6.00
7 FIN-09500 Returned Check Collection Personal Delivery To House $58.00 8 Mailed $31.00
9 Electronic Notice $20.00
10 FIN-09600 Small Claims Hearing Fee $164.00
11 FIN-09700 Reminder/Final Notice Fee $123.00
12 FIN-09800 Small Claims Filing Fee $41.00
13 FIN-10800 After Hours Reconnection Fee $336.00
14 FIN-11400 Assessment District Liens Plus Cost Of Assessment Consultant$686.00 15 FIN-12200 Pulled Meter Penalty Fee $114.00
16 FIN-12300 One-Day Water Permit Plus Usage. Plus Pro-Rated Readiness-To- Serve Charge If Kept Longer Than 1 Day $154.00
17 FIN-13900 Damage To City Property
18 FIN-14900 Assessment Dist App Fee Fee $396.00
19 FIN-15100 Escrow Retention Agreement Agreement $759.00 20 Plus Per Month Maintenance Fee $18.00
21 FIN-15800 Special Event Vendor Permit Fee $20.00
22 Developer Paid -Municipal Services Fee Per Residential Unit $1,759.00
23 Developer Paid -Municipal Services Fee
Per Acre Of Non-
Residential
Property
$7,036.00
Note: 1-2% Subsidy is due to rounding issue
1 Business License
# Service Center # Service Center Name Base Fee/Subcategory Unit Notes 2026 Fee 2026 Fee 1 FIN-04100 Special Business Permit Hearing - Non-ProfitNo Fee $0.00 2 FIN-04100A Special Business Permit Hearing - RegularNo Hearing $310.00 3 With Hearing Plus Actual Cost For Hearing
Officer $781.00
4 FIN-04100B Special Business Permit -Advertising By
Distribution Of Samples Or Handbills
Base Fee Per
Business $39.00
5 Plus Per Distributor $8.00
6 FIN-04200 Special Permit Investigation Minimum Plus Actual Cost Of Police Investigation $202.00
7 FIN-09900 Duplicate Business License Certificate Fee $41.00 8 FIN-10700 Film Permit Application Base
Plus Costs For Associated Staff
Time; Plus Negotiated Rental
Fee For Use Of Public Property
$425.00
9 FIN-10900 Special Business Permit Renewal Regular Applicant $244.00 Chino Non-
Proftit Fees
All Other
Fees
10 FIN-13000 Special Event Permit - Major Small Event - up to 200 attendees* $401.00 $1,002.00 11 Medium Event - 201-500 attendees* $448.00 $1,121.00
12 Large Event - 501-1,500 attendees* $80.00 $2,050.00
13 Major Event - 1,501 attendees and above* $1,152.00 $2,880.00 14 City Partnered/Sponsored Events $0.00 $0.00
15 Recognized Sports Groups/Tournaments** $0.00 $0.00
16 FIN-13011 Special Event Permit - Expediting FeeFee Additional 50% of base feeAdd'l 50% Add'l 50% 17 FIN-13015 Special Event Flyer Street NotificationFee $211.00 18 FIN-15200 Adult-Oriented Business Application FeeFee $534.00 19 FIN-15300 Adult Entertainer Application Fee Fee $279.00 20 FIN-15401 City Business Listing Cd Or Printout (Plus Applicable Calif. Sales Tax) $164.00
Note: 1-2% Subsidy is due to rounding issue
1 City of Chino

COMMUNITY SERVICES, PARKS RECREATION FEES
Resolution 2026-XXX
Exhibit B
SERVICE CENTER NAME Unit/Category 2025
Fees
2026
FeesP
ercent of Direct Cost
Recovery
ADULT SPORTS PROGRAMS 100%
Women's Soccer Individual fee $35 $35
Sports Leagues and Tournament Fees Team fee $25 - $400 $25 - $400 Forfeit Fee Team fee $55 - $80 $55 - $80
Late Registration Fee (Non-Refundable) Team fee $25 $25 YOUTH SPORTS PROGRAMS1 56%
Programs and Tournament Fees $5 - $150 $5 - $150
Late Registration Fee (Non-Refundable) $10 $10
Jersey Fee*** $10 - $40 $10 - $40
BATTING CAGES 100%
Token 15 pitches $1.50 $2
15 minutes Session $11 $15
30 minutes Session $21 $25
60 minutes Session $35 $40
Team Reservation, 60 minutes Session $30 $35
SPORTS FACILITY RENTALS (Hourly)*
Sports Field Rental Staffing Hourly $30 $30
Resident Youth Team Hourly $9 $9
Resident Youth Team (1/2 Soccer Field) Hourly $4.50 $4.50 Non-Resident Youth Team Hourly $20 $20
Non-Resident Youth Team (1/2 Soccer Field) Hourly $10 $10 Resident Adult Team Hourly $20 $20
Resident Adult Team (1/2 Soccer Field) Hourly $10 $10
Non-Resident Adult Team Hourly $40 $40
Non-Resident Adult Team (1/2 Soccer Field) Hourly $20 $20 Softball/Baseball Field Prep (2 or more Fields) Each
Contracted Service -
Fees set by
Contractor
Contracted Service -
Fees set by
Contractor
Softball/Baseball Field Prep (1 Field Only) Each
Contracted Service -
Fees set by
Contractor
Contracted Service -
Fees set by
Contractor
Soccer Field Prep Each $100 $100
Tournament Security Deposit Deposit $500 $500
Ayala Park Synthetic Field Youth Resident Hourly $45 $45 Ayala Park Synthetic Field Adult Resident Hourly $50 $50 Ayala Park Synthetic Field Youth Non-Resident Hourly $55 $55 Ayala Park Synthetic Field Adult Non-Resident Hourly $60 $60 Commercial Park Rental Permit Fee - Resident Monthly $200 $200 Commercial Park Rental Permit Fee - Non-Resident Monthly $300 $300 Pitching Mound Rental Daily $50 $50
Restroom Custodial Staff - Ayala Park **** $45
Late Payment Processing Fee**** Daily $25 REMOVE

SPORTS FACILITY MAINTENANCE (HOURLY)
Resident Youth Team (ballfield) $2 $2
Resident Youth Team (soccer field/stadium) $3 $3
Non-Resident Youth Team (ballfield) $3 $3
Non-Resident Youth Team (soccer field/stadium) $4 $4
Resident Adult Team (ballfield) $2 $2
Resident Adult Team (soccer field/stadium) $3 $3
Non-Resident Adult Team (ballfield) $3 $3
Non-Resident Adult Team (soccer field/stadium) $4 $4
1 City of Chino

COMMUNITY SERVICES, PARKS RECREATION FEES
Resolution 2026-XXX
Exhibit A
SERVICE CENTER NAME Unit/Category 2025
Fees
2026
Fees
Percent of Direct Cost
Recovery
SPORTS FIELD LIGHTING 100%
Youth Groups Hourly $18 $18
Youth Groups (2 groups per soccer field) Hourly $9 $9
Adult Groups Hourly $24 $24
Adult Groups (2 groups per soccer field) Hourly $12 $12 SWIMMING LESSONS 41%
Group Lessons Individual fee $72 $72
Semi-private Lessons Individual fee $109 $109
RECREATIONAL SWIMMING Individual fee $2 $2
SENIOR PROGRAMS 20%
Various Various
RECREATION CLASSES1
80%
Various Various
CAMP3
100%
Camp Individual fee/weekly $175 $190
Camp - Daily Individual/daily $45 $50
TINY TOTS CLASSES 100%
3-days per week Individual fee/5 weeks $245 $245
2-days per week Individual fee/5 weeks $185 $185
Enrichment Classes Monthly $55 - $75 $55 - $75
COMMUNITY EVENTS4
Corporate Challenge Entry Fee Team fee $900 $900
Tier 1-Non-Profit Vendor (Food) Individual fee $105 $105 Tier 1- Non-Profit Vendor Fee (Retail) Individual fee $80 $80 Tier 1 - Commercial Vendor Fee (Food) Individual fee $175 $175 Tier 1 - Commercial Vendor Fee (Retail) Individual fee $135 $135 Tier 1 - Commercial Vendor (Information Booth) Individual fee $90 $90 Tier 2 - Non-Profit Vendor Fee (Food) Individual fee $75 $75 Tier 2 - Non-Profit Vendor Fee (Retail) Individual fee $60 $60 Tier 2 - Commercial Vendor Fee (Food) Individual fee $115 $115 Tier 2 - Commercial Vendor Fee (Retail) Individual fee $90 $90 Tier 2 - Commercial Vendor (Information Booth) Individual fee $60 $60 Tier 3 - Non-Profit Vendor Fee (Food) Individual fee $40 $40 Tier 3 - Non-Profit Vendor Fee (Retail) Individual fee $35 $35 Tier 3 - Commercial Vendor Fee (Food) Individual fee $85 $85 Tier 3 - Commercial Vendor Fee (Retail) Individual fee $65 $65 Tier 3 - Commercial Vendor (Information Booth) Individual fee $45 $45 Tier 4 - Non-Profit Vendor Fee (Food) Individual fee $25 $25 Tier 4 - Non-Profit Vendor Fee (Retail) Individual fee $20 $20 Tier 4 - Commercial Vendor Fee (Food) Individual fee $50 $50 Tier 4 - Commercial Vendor Fee (Retail) Individual fee $40 $40 Tier 4 - Commercial Vendor (Information Booth) Individual fee $25 $25 Non-Profit Vendor (Information Booth) Individual fee $20 $20 Homemade Craft Vendor Fee Individual fee $40 $40
10' X 10' Vendor Canopy Rental Individual fee $25 $25
Community Events Participation Fee Individual fee $5-$25 MEETING ROOM/FACILITY RENTALS (Hourly)5

Room Set Up Fee Flat $35 - $65 $35 - $65
Clean Up Fee - Optional Flat $55 - $265 $55 - $265
Deposit Refundable $250 $250
Custodial Personnel Hourly $45 $45
Gym Floor Coverage Fee Service fee $80 $80
Facility Rental - Application Processing Fee** Flat $35 $35 Round Tables Rental Each $15 $15
2 City of Chino

COMMUNITY SERVICES, PARKS RECREATION FEES
Resolution 2026-XXX
Exhibit A
SERVICE CENTER NAME Unit/Category 2025
Fees
2026
Fees
Percent of Direct Cost
Recovery
Group II Rentals 35%
Group II - Small room Hourly $20 $20
Group II - Medium room Hourly $25 $25
Group II - Large room Hourly $30 $30
Group II - Double room Hourly $40 $40
Group II - Auditorium Hourly $45 $45
Group II - Kitchen Flat $30 $30
Group II - Gymnasium Hourly $55 $55
Group III Rentals 100%
Group III - Small room Hourly $40 $40
Group III - Medium room Hourly $50 $50
Group III - Large room Hourly $65 $65
Group III - Double room Hourly $75 $75
Group III - Auditorium Hourly $100 $100
Group III - Kitchen Flat $40 $40
Group III - Gymnasium Hourly $75 $75
Group IV Rentals 100%
Group IV - Small room Hourly $55 $55
Group IV - Medium room Hourly $70 $70
Group IV - Large room Hourly $80 $80
Group IV - Double room Hourly $100 $100
Group IV - Auditorium Hourly $145 $145
Group IV - Kitchen Flat $65 $65
Group IV - Gymnasium Hourly $95 $95
Group V Rentals
Group V - Small room Hourly $70 $70
Group V - Medium room Hourly $80 $80
Group V - Large room Hourly $90 $90
Group V - Double room Hourly $110 $110
Group V - Auditorium Hourly $155 $155
Group V - Kitchen Flat $65 $65
Group V - Gymnasium Hourly $105 $105
Alcohol Deposit Deposit $500 $500
Security Guard Hourly/per guard $45 $45
Partner Universities/Colleges
Monday - Thursday Rentals Hourly $26 $26
Friday - Sunday Rentals Hourly $37 $37
PICNIC PAVILION RENTALS 100%
Deposit - (up to 100 people) Refundable deposit $50 $50 Deposit - (101+ people) Refundable deposit $100 $100
(50 people or less) Daily $80 $80
(51-100 people) Daily $120 $120
(101-199 people) Daily $155 $155
(200+ people) Daily $195 $195
Bouncer Service fee $30 $30
AFTER SCHOOL RECREATION6
70%
Monthly Individual fee $170 $170
Monthly - Low/Moderate Income Qualified Individual fee $80 $80 3 City of Chino

COMMUNITY SERVICES, PARKS RECREATION FEES
Resolution 2026-XXX
Exhibit A
SERVICE CENTER NAME Unit/Category 2025
Fees
2026
Fees
Percent of Direct Cost
Recovery
TEEN PROGRAMS 10%
Monthly Individual fee $8 $8
Shuttle Fee Individual fee/monthly $50 $50
TRIPS & TOURS7
100%
Excursion Fee Per trip Actual Cost Actual Cost

OTHER FEES
Replacement Jersey/T-Shirt Fee Individual fee $5 - $40 $5 - $40 Resident Counseling Fee Hourly $15 $15
Non-Resident Individual Counseling Hourly $35 $35
Non-Resident Program Fee 8 Individual fee $10 $10
Staff Fee Hourly $35 $35
Late Pickup Fee (After School, Camp, Tiny Tots) Minute $1 PC 1000 Individual fee/26 weeks
Fee Set by
San Bernardino
County
Fee Set by
San Bernardino
County
Choices Individual fee/52 weeks
Fee Set by
San Bernardino
County
Fee Set by
San Bernardino
County
Sunrise Kids (before school care) Individual/weekly fee $75 $75 100% Open Gym - Adult Resident Individual fee $3 $3
Open Gym - Adult Non-Resident Individual fee $4 $4
Open Gym - Youth Non-Resident Individual fee $1 $1
Gym Monthly Membership Individual fee $27 $27
Gym Identification Card Fee Individual fee $5 $5
Chino Store Products Per Item $1 - $100 $1 - $100
Street Banner Fee Group fee $165 $165
City BBQ Rental Fee Group fee $100 $100
City BBQ Rental Fee - 2 day period Group fee $175 $175
Skate Park Rental Hourly $150 - $1,000 $150 - $1,000
Skate Park Deposit Refundable $500 $500
Refund Processing Fee Per Activity/Per Participant $5 $5 Senior Programs Refund Processing Fee Per Activity/Per Participant $2 $2 Family Campout Family of 4 $70 - $100 $70 - $100
Family Campout - Additional Campers (Maximum 2) Individual $10 $10 HEALTHY CHINO 5%
Healthy Chino Programs Individual fee $5 - $60 $5 - $60 Community Garden Plot Deposit Deposit $25 $25
Community Garden Plot Rental Fee Yearly $25- $75 $25- $75 Chino Youth Museum Events, Programs and
Merchandise
Fees set by
the Chino Youth
Museum Board of
Directors
Fees set by
the Chino Youth
Museum Board of
Directors
Boxing Events, Programs and Merchandise
Fees set by
the Chino Youth
Boxing Board of
Directors
Fees set by
the Chino Youth
Boxing Board of
Directors
4 City of Chino

COMMUNITY SERVICES, PARKS RECREATION FEES
Resolution 2026-XXX
Exhibit A
SERVICE CENTER NAME Unit/Category 2025
Fees
2026
Fees
Percent of Direct Cost
Recovery
2 Youth Boxing: Under 18 or current high school student 4 Community Events Tiers
Tier 1: 4,000+ attendees
Tier 2: 1,000 - 3,999 attendees
Tier 3: 1 - 1,000 attendees
Tier 4: Consecutive Weeks Event
5 Meeting Room/Facility Rental Classification Definitions and Cancellation policy Group I - City of Chino and City of Chino Service Clubs (charged only the staff time when applicable) Group II - City of Chino non-profits including churches and community groups Group III - City of Chino residents, non-resident non-profits including churches and community groups Group IV - Non-resident private rentals and resident commercial use Group V - Non-resident commercial
Cancellation of reservation 30+ days from date of event, flat fee of $30 Cancellation of reservation 14-30 days from date of the event, 50% of the fees are refundable.

Cancellation of reservation less than 14 days from date of the event, fees are non-refundable. 8 Excluding Recreational Swimming, Sports Field Rentals, After school, Meeting Room Rentals, and track. *** Non-refundable once jersey order is placed.
**** Up to 7 days. If not paid, permit will be cancelled.

Notes:
****Tournaments require restroom custodial staff. Custodial staff will begin one hour after the start of the tournament each day and will end one hour before the tournament ends each day. Renting 4-6 softball/baseball fields requires one custodial staff. Renting 4-5 soccer fields requires one custodial staff and 6 or more requires two custodial staff. ** A non-refundable application fee of $35 will be applied to every facility rental request, except from those user groups that are exempt as specified in the facility reservation policy. This fee will be collected at the time of application submittal. Sports Facilities Rentals are excluded from this fee.
*Cancellations must be submitted in writing. Cancellation of reservation 30 days from permit date, 100% of fees are refundable.

Cancellation of reservation 14-29 days from permit date, 50% of fees and deposit are refundable. Cancellation of reservation 13 days from permit date, fees and deposit are non-refundable.
7 Trips and Tours: Refunds and credits are issued only if a requested cancellation can be filled from the waitlist. 1 Refund Policy: Refunds/Credits will only be issued before the second class/program/sport meeting. 3 Camp: Fees are non-refundable. Fees are transferable based on availability. Transferring weekly fees must be made by the Friday prior to the registered week.
6 After School Recreation: Transfers, credits, and refunds are only available if requested by the Friday prior to the registered week. Fees are transferrable based on availability.
5 Parking Fines
2025 Fee 2026 Fee
# Description Fee Fee
1 Municipal Code Violations
2 10.28.030(b) - Stop/Park In Yellow or Green Zones, Painted Curb or Posted Sign $35.00 $36.00
3 10.28.050 - Stop/ Park in Parkway $35.00 $36.00
4 10.28.060(a) - Stop/Park within Divisional Island Unless Indicated by Signs/Markings $35.00 $36.00
5 10.28.060(d) - No Parking Zone/Red Paint or Posted Sign$35.00 $36.00 6 10.28.060(f) - Stop/Park Creating a Traffic Hazard $35.00 $36.00 7 10.28.060(g) - Temporary No Parking/Posted 24 Hours in Advance $35.00 $36.00
8 10.28.060(h) - Within 20 feet of X-Walk/Intersection/Business Dist. when Posted or Red Curb Except at Bus Stop$35.00 $36.00 9 10.28.065 - No Parking on Specified Streets during Specified Days (street sweeping) $35.00 $36.00
10 10.28.090(a)(1) - Unlawful to Park Except: Diagonal Parking Within Markings $35.00 $36.00
11 10.28.090(a)(2) - Unlawful to Park Except: Diagonal
Parking/Right Front Wheel 6" from Curb $35.00 $36.00
12 10.28.100 - One Way Street/Parking on Left Side $35.00 $36.00 13 10.28.110(b) - Emergency No Parking Signs $35.00 $36.00 14 10.28.120(b) - No Parking Signs Are Adjacent to School/ When Posted $35.00 $36.00
15 10.28.130 - No Longer Than 2hr Parking/Between 7am-6pm, except Sundays & Holidays $35.00 $36.00
16 10.28.140(b) - Parking on Narrow Street/Roadway Width Less Than 20 feet / When Posted $35.00 $36.00
17 10.28.150 - Stop/Park in Any Alley $35.00 $36.00
18 10.28.160 - Park for Sale or Advertising on Street $35.00 $36.00 19 10.28.170 - Parking for Auto Repairs or Greasing, on Highway$35.00 $36.00 20 10.28.180(a) - Park/Vending from Vehicle or Pushcart/Excess of 10 Minutes $35.00 $36.00
21 10.28.190 - Parking Excess of 72 Hours/on Highway$50.00 $51.00 22 10.29.060(j) - Permit Parking Only: 1st Violation $50.00 $51.00 23 10.29.060(j) - Permit Parking Only: 2nd Violation $150.00 $154.00 24 10.29.060(j) - Permit Parking Only: 3rd Violation $250.00 $256.00 25 10.30.030(a) - Park Commercial Veh. on Public/Private Prop./Excess of 3 hrs, 10,000lbs: 1st Violation within one year$50.00 $51.00 1 Parking Fines
2025 Fee 2026 Fee
# Description Fee Fee
26 10.30.030(a) - Park Commercial Veh. on Public/Private Prop./Excess of 3 hrs, 10,000lbs: 2nd Violation within one year$100.00 $102.00 27 10.30.030(a) - Park Commercial Veh. on Public/Private Prop./Excess of 3 hrs, 10,000lbs: 3rd Violation within one year$250.00 $256.00 28 10.30.030(b) - Store Commercial Veh. on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 1st Violation $50.00 $51.00 29 10.30.030(b) - Store Commercial Veh. on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 2nd Violation within one year
$100.00 $102.00
30 10.30.030(b) - Store Commercial Veh. on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs: 3rd Violation within one year
$250.00 $256.00
31 10.30.030(c) - Park Trailer or Semi-trailer on Public/Private Prop./Excess of 3 hrs, 10,000lbs: 1st Violation $50.00 $51.00 32 10.30.030(c) - Park Trailer or Semi-trailer on Public/Private Prop./Excess of 3 hrs, 10,000lbs: 2nd Violation within one year$100.00 $102.00 33 10.30.030(c) - Park Trailer or Semi-trailer on Public/Private Prop./Excess of 3 hrs, 10,000lbs: 3rd Violation within one year$250.00 $256.00 34 10.30.030(d) - Store Trailer or Semi-trailer on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs:
1st Violation
$50.00 $51.00
35 10.30.030(d) - Store Trailer or Semi-trailer on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs:
2nd Violation within one year
$100.00 $102.00
36 10.30.030(d) - Store Trailer or Semi-trailer on Private Residential Prop./Excess of 3 hrs, in 30 day period, 10,000lbs:
3rd Violation within one year
$250.00 $256.00
37 10.30.030(e) - Stopped, Standing, or Parked, Commercial Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for a Consecutive Period of 6 hrs, 10,000lbs: Deemed abandoned. 1st Violation
$50.00 $51.00
2 Parking Fines
2025 Fee 2026 Fee
# Description Fee Fee
38 10.30.030(e) - Stopped, Standing, or Parked, Commercial Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for a Consecutive period of 6 hrs, 10,000lbs: Deemed abandoned. 2nd Violation within one year
$100.00 $102.00
39 10.30.030(e) - Stopped, Standing, or Parked, Commercial Vehicle, Trailer or Semi-trailer on Private Prop./Unattended for a consecutive period of 6 hrs, 10,000lbs: Deemed abandoned. 3rd Violation within one year
$250.00 $256.00
40 10.30.040 - Parked Vehicle for Sale on Commercially Zoned Prop/Excess of 2 hours: 1st Violation $50.00 $51.00
41 10.30.040 - Parked Vehicle for Sale on Commercially Zoned Prop/Excess of 2 hours: 2nd Violation within one year$100.00 $102.00 42 10.30.040 - Parked Vehicle for Sale on Commercially Zoned Prop/Excess of 2 hours: 3rd Violation within one year$250.00 $256.00 43 10.32.060(a)(1) - Stop/Park in Commercial Loading Zone Exceeding 20 mins $35.00 $36.00
44 10.32.060(b)(1) - Stop/Park in Passenger Loading Zone Exceeding 3 mins $35.00 $36.00
45 10.32.070 - Park Yellow Zone for Loading or Unloading of Passengers or Matarials $35.00 $36.00
46 10.32.080 - Stop/Park Yellow Zone/Excess of 3 mins/ Other Than to Load or Unload $35.00 $36.00
47 10.32.090 - Stop/Park in Alley/See 10.28.060 for Time Limits$35.00 $36.00 48 10.44.010 - Parked Off a Truck Route/10,000lbs Gross Vehicle Weight Or More $100.00 $102.00
49 10.44.015 - Unattached Trailer or Semi-Trailer $100.00 $102.00 50 Vehicle Code Violations Fine*
51 4000a - Expired Registration $75.00 $77.00
52 VC 5200 - Displayed Issued Plates $36.00
53 5204(a) - No Tabs $75.00 $77.00
54 21113(a) Unauthorized Parking on School or Public Grounds$35.00 $36.00 55 21211(b) Park/place Bike Vehicle in Bike Path $75.00 $77.00 56 22500a- Vehicle Parked Within Intersection $35.00 $36.00 57 22500b - Vehicle Parked on Crosswalk $35.00 $36.00
58 22500c - Vehicle Parked Adjacent to Safety Zone $35.00 $36.00 3 Parking Fines
2025 Fee 2026 Fee
# Description Fee Fee
59 22500d - Vehicle Parked Within 15ft of Fire Station Driveway$35.00 $36.00 60 22500e - Vehicle Blocking Driveway $35.00 $36.00
61 22500f - Vehicle Parked on a Sidewalk $35.00 $36.00
62 22500g - Vehicle Blocking Excavation $35.00 $36.00
63 22500h - Double Parking $35.00 $36.00
64 22500i - Vehicle Parked in Posted Bus Loading Zone$35.00 $36.00 65 22500k - Vehicle Parked on Bridge or Tunnel $35.00 $36.00 66 22500.1 - Parked In Fire Lane $75.00 $77.00
67 VC 22500(n)(1)(A) - Blockng Crosswalk Approach $36.00 68 22502a - 18 Inches From Curb / Wrong Way $35.00 $36.00 69 22505 - Park on State Highway/when Posted $35.00 $36.00 70 22507.8(a) - Handicap Disabled Only $300.00 $307.00
71 22507.8(b) - Block or Obstruct Disabled Stall/Space$300.00 $307.00 72 22507.8(c)(2) - Block or Obstruct Disabled Stall/Space$300.00 $307.00 73 22514 - Within 15ft of Fire Hydrant $50.00 $51.00
74 22515 - Unattended Running Vehicle $35.00 $36.00
75 22516 - Vehicle Locked with Person Who Can't Escape$35.00 $36.00 76 22517 - Door Open to Traffic $50.00 $51.00
77 22520 - Stopping on a Freeway $35.00 $36.00
78 22521 - Parked Within 7.5ft of Rail Road $75.00 $77.00 79 22522- Parking Within 3ft of Sidewalk Access Ramp$75.00 $77.00 80 22526a- Grid Lock $75.00 $77.00
81 County Code Violations
82 CC 53.064a - Failed to Park In Stall $13.50 $14.00
83 CC 53.064b - Failed to Comply with Signs/Directions$13.50 $14.00 84 CC 53.064c - Failed to Park in Designated Lot/Stalls$13.50 $14.00 85 CC 53.064d - Parked to Cause Obstruction/ Hazard$13.50 $14.00 86 CC 53.065 - 15mph or Posted Speed Limit $13.50 $14.00 87 CC 52.0119 - Parked in Excess of 72 hours $28.50 $29.00 *Plus State/County Surcharge of $12.50 when applicable, per County GC 76000(b) and State GC Sec. 70372(b) and 76000.3 1st Penalty Late Charge $25.00 at 32 days
2nd Penalty Late Charge $25.00 at 62 days
Delinquent Citation sent to DMV at 63 days
3rd Penalty Late Charge $25.00 at 92 days
4 Police Revenue Analysis
#
Service Center
# Service Center Name Base Fee/Subcategory Unit Notes
Subject to CPI
Increase? 2025 Fee 2026 Fee
1 PERMITTED TOW SERVICE OPERATOR FEE SCHEDULE
2 Initial tow service
This fee is for up to one hour of services
performed, inclusive of one driver and one
light duty tow vehicle. This fee is retained by
the tow service operator.

No At Contract Rate At Contract Rate
3 Additional hourly labor rate
This fee is for additional time after the initial
hour of the tow service or a second driver and
tow vehicle, if needed for a complicated tow
or scene, at the request of a police
No At Contract Rate At Contract Rate
4 Daily outside storage*
This fee is for storage of a stored or
impounded vehicle at the tow providers
storage yard, including the initial day of the
towed vehicle.

No At Contract Rate At Contract Rate
5 Daily inside storage*
This fee is for the storage of a stored or
impounded vehicle at the tow providers
storage yard, including the initial day of the
towed vehicle.

No At Contract Rate At Contract Rate
6 After hours tow yard release
This fee is authorized in the event of a vehicle
release after the normal, posted business
hours of a tow service operator. This fee is
retained by the tow service operator.

No At Contract Rate At Contract Rate
7 PD-04210 Special Permit (Id Badge) Yes $68.00 $70.00
8 PD-04300 Bicycle Registration Fee (Set at $3) Fee Set By State No $3.00 $3.00 9 PD-04500 Parking Enforcement Fines Set By City Resolution/Bail Schedule, Plus State/County Surcharges **
10 PD-04600 Vehicle Inspection Yes $40.00 $41.00
11 PD-04650 Vin Verification Yes $53.00 $54.00
12 PD-05100 False Alarm Response (In A 12-Month Period From July 1-June 30) .

Fourth Response and
Subsequent Yes $149.00 $153.00
13 PD-05260 Subpoena Duces Tecum Processing Photocopy Page Yes $0.10 $0.10 14 Postage No Actual Cost Actual Cost
15 Prod & Deliv Qtr. Hr. Yes $6.00 $6.00
16 On-Site Records Yes $15.00 $15.00
17 8 GB Flash Dr Yes $5.00 $5.00
18 128 GB Flash Dr Yes $25.00 $26.00
19 1 TB External Dr Yes $71.00 $73.00
20 1 CD-R Yes $1.00 $1.00
21 64 GB Flash Dr Yes $13.00 $13.00
22 16 GB Flash Dr Yes $8.00 $8.00
23 32 GB Flash Dr Yes $10.00 $10.00
24 PD-05300 Local Criminal History Record (Set At $25)Application Yes $25.00 $26.00 25 PD-05400 Fingerprint Service Plus State/County Fees For All Other Applicants Yes $34.00 $35.00
26 PD-05500AClearance Letter/Records Check Abc Letter Yes $74.00 $76.00 27 PD-05500B Clearance Letter/Records Check Passport Letter Yes $14.00 $14.00 28 PD-05800 Special Parking Permit Permit Yes $21.00 $22.00 29 PD-05900 Parade Services (Actual) City Or School District Sponspored Events No $0* $0.00
30 PD-05900 Parade Services Other Applicants No Actual Cost Of City Services
Actual Cost of
City Services
31 PD-11000 Dui Response Not To Exceed $10,000 No Actual Cost Actual Cost 32 PD-11800 Department Of Justice Permit - Pawn & Second Hand Dealer Shops Yes $148.00 $152.00
33 PD-11900 Vehicle Release Fee No Fee For Victim No $0.00 $0.00 34 Other Than Victim Plus
Towing Fee Yes $214.00 $219.00
35 PD-13300 Repossessed Vehicle Fee (Set by State statute at $15) Fee Set By Statute At $15 No $15.00 $15.00
36 PD-13800 Truancy/Curfew Fee Plus Hourly Rate For Officer Yes $60.00 $61.00 37 PD-15700 Firearm Storage Fee First Gun Yes $219.00 $224.00 38 PD-15700 Firearm Storage Fee Second Gun Plus Yes $93.00 $95.00 * The tow service operator shall transmit one-half of all storage fees collected to the Police Chief and retain one-half of such fees as compensation for its storage services, and shall remit the balance at the end of each month to the city (CMC 5.36.130 F) 1 Deveopment Services
#
Service Center
# Service Center Name Base Fee/Subcategory Unit Notes 2026 Fee 1 DS-00810 Tentative Tract Map Base Fee $10,057.00
2 Plus Per Lot $20.00
3 DS-00820 Tentative Parcel Map Base Fee $9,099.00
4 Plus Per Lot $20.00
5 DS-01100a Env.Review-Mnd,Nd, Addendum (Mitigated Negative Declaration,Negative Declaration, Addendum) $5,497.00
6 DS-01100b Env.Review - Eir $11,155.00
7 DS-01700 General Plan Update of the job valuation 0.05% 8 DS-01710 General Plan Amendment-Map Change $9,339.00
9 DS-01720 General Plan Amendment-Text Change $8,220.00 10 DS-01750 Specific Plan Amendment Review $10,101.00
11 DS-01800 Special Conditional Use Permit Only - Commercial/Industrial $7,671.00 12 DS-01800 Special Conditional Use Permit Only - Residential/Owner Occupied (68% Subsidy) $7,395.00 13 DS-01850 Special Conditional Use Permit And Site Approval Concurrently $12,681.00 14 DS-01860 Developer Modification -- Scup $5,398.00
15 DS-01900 Variance Fee $5,574.00
16 Residential Applicant $240.00
17 DS-01950 Admin Review-Residential W/O Drc $787.00
18 DS-01955 Admin Review-Residential W/O Drc Time Extension $594.00 19 DS-01960 Admin Review-Commercial Or Industrial With Drc Review $5,138.00 20 DS-01961 Developer Modification Of Admin Review-Comm/Ind. With Drc Review $3,272.00 21 DS-01970 Admin Review-Commercial Or Industrial Without Drc Review $2,418.00 22 DS-01971 Developer Modification Of Admin Review-Comm/Ind. Without Drc Review $1,353.00 23 DS-02000 City Council Appeal Processing - Non-Resident Applicant Appealing A Planning Commission Decision $4,921.00
24 DS-02000 City Council Appeal Processing - Resident Applicant Appealing A Planning Commission Decision $1,230.00
25 DS-02010 Planning Commission Appeal Processing - Non-Resident Applicant Appealing A Decision Regarding Development $6,598.00
26 DS-02010 Planning Commission Appeal Processing - Resident Applicant Appealing A Decision Regarding Development $1,607.00
27 DS-02015 SB18/AB52 $748.00
28 DS-02100 Development Time Extension-Administrative $1,975.00 29 DS-02110 Development Time Extension -Discretionary $2,521.00 30 DS-02300 Zone Change Review $10,274.00
31 DS-02320 Pre-Zone With Annexation Fee Plus Lafco
Fees $14,350.00
32 DS-02400 Zoning Ordinance Amendment $6,439.00
33 DS-02410 Zoning Verification $259.00
34 DS-02500 Sign Review $408.00
35 DS-02550 Sign Program Review $1,639.00
36 DS-02600 Site Approval Review - When Applied For Separately $11,370.00 37 DS-02610 Master Site Approval Review - The Preserve/College Park 5-20 Acres $8,993.00 38 21- 125 Acres $9,958.00
39 126 & Above $15,233.00
40 DS-02700 Sign Ordinance Amendment $8,025.00
41 DS-02800 Sign Ordinance Variance $3,480.00
42 DS-02900 Development Agreement Processing City Attorney And Staff Time Actual Cost
43 DS-02910 Development Agreement Annual Compliance Review City Attorney And Staff Time Actual Cost
44 DS-03000 Preliminary Project Review $4,106.00
45 DS-03100 Developer Modification Request For Site Approval $8,738.00 46 DS-03101 Developer Modification Request For Site Approval/Scup -Admin Review $2,479.00 47 DS-03131 Developer Modification Request For Subdivision $4,352.00 48 DS-03132 Developer Modification - Condition Of Approval $2,425.00 49 DS-03140
Covenants, Conditions & Restrictions (Cc&R) Review
Plus Actual Cost
Of City Attorney
Review
$1,113.00
50 DS-03200 Agricultural Preserve Withdrawal Plus Outside Costs $2,482.00
51 DS-03300 Agricultural Contract -Partial Notice Of Non-Renewal Plus Outside Costs $2,055.00
52 DS-03310 Agricultural Contract-Notice Of Non-Renewal Plus Outside Costs $2,096.00
53 DS-03320 Agricultural Contract Cancellation Plus Outside Costs $4,503.00
54 DS-03600 Special Agreement To Assist Development Actual Cost 55 DS-03660 Model Home Agreements Actual Cost
56 DS-10000 Mobile Home Annual Registration Per Space $23.00 1 Deveopment Services
#
Service Center
# Service Center Name Base Fee/Subcategory Unit Notes 2026 Fee 57 DS-10001 Mobile Home Premium Hearing Application $5,286.00 58 DS-10600 Abandoned Vehicles Plus Towing Fee $126.00
59 DS-11700-710 Landscaping/Lighting/Wall Plan Review Base Plus Actual Cost Of
Outside Consultant For
Construction Plans
$1,183.00
60 Landscaping/Lighting/Wall Plan Review
Base Plus Cost Of Outside
Consultant For Conceptual
Plans/Minor Administrative
Landscape Review
$556.00
61 Landscape Revision $556.00
62 DS-15001 Temporary Banner Permit $41.00
63 DS-15500 Design Review Board-The Preserve & College Park Base Plus Actual Staff Time For DRB $3,469.00
64 DS-15804 Public Notice For Project Entitlements- Developer (Plus Actual Mailing Costs) Base Fee Plus Actual
Notice And
Mailing Cost
$309.00
65 No Fee For Residential
Applicant $0.00
66 DS-15805 Collection Container Permit $280.00
67 DS-15806 Collection Container Renewal Permit $46.00
68 DS-15807 Collection Container Replacement Permit Sticker $74.00 69 Verbatim Minutes Management Assistant (FBHR
+ Time) Flat Rate $411.00
70 Sign Program Review PC Approval $2,330.00
71 Design Guideline Review Fee $6,625.00
72 Administrative Fee Residential with DRC Review $1,274.00 73 Home Occupation Permit charged same as DS-01950
"Residential w/o DRC" $283 $247.00
74 SB9 Administrative Lot Splits (Tentative Parcel Map) $3,557.00 75 SB330 Application Review $2,108.00
76 Sign Program Revision $468.00
77 Document Recordation $123.00
78 Art in Public Places 0.1% of Total Building
Permit Valuation
Note:
1-2% Subsidy is due to rounding issue
Expedite Fee: 100% surcharge on all fees
2 Deveopment Services
# Service Center #Service Center Name Base Fee/Subcategory Unit Notes 2026 Fee 1 DS-00110 Building Permit / Inspection (Plus 7.5% Technology Fee) Of Building Permit Fee Most Recent Version Of Uniform Administrative Code Actual Cost 2 DS-00110 Electrical Permit / Inspection (Plus Technology Fee = 7.5% Of Electrical Permit Fee)
Of Building
Permit Fee Most Recent Version Of Uniform Administrative Code Actual Cost 3 DS-00110 Mechanical Permit / Inspection (Plus Technology Fee = 7.5% Of Mechanical Permit Fee)
Of Building
Permit Fee Most Recent Version Of Uniform Administrative Code Actual Cost 4 DS-00110 Plumbing Permit / Inspection (Plus Technology Fee = 7.5% Of Plumbing Permit Fee)
Of Building
Permit Fee Most Recent Version Of Uniform Administrative Code Actual Cost 5 DS-00120 Green Building Standards (Cbsc Fee) Fee Set By Sb 1473, Based On Building Valuation Actual Cost
6 DS-01200 Building Plan Review Of Building
Permit Fee
To Cover Cost Of Plan Check And Title 24 Energy Calculations, As Well As American Disability Act Requirements. For Plan Check On Plans For Housing Tracts With Model Homes, 75% Of Building Fee For Each Individual Model And 35% Of Building Fee For Each Additional Residential Unit 75%
7 DS-03900 Special Permit Building Inspection $251.00
8 DS-03905 Special Inspection Registration $83.00
9 DS-13600 Legal Address Change $582.00
10 DS-15801 Solar Panel - Residential Base Fee Plus $15 Per Kw For Each Kw Above 15 Kw (Capped at $450) $450.00 11 DS-15802 Solar Panel - Non-Residential, 0-250Kw Base Fee Plus $7 Per Kw Between 51Kw And 250Kw (Capped at $1,000)$922.00 12 DS-15803 Solar Panel - Non-Residential, Above 250Kw Base Fee Plus $5 Per Kw Above 250 Kw $1,024.00 13 DS-15808 Temporary Certificate Of Occupancy -Small Project $1,027.00 14 DS-15809 Temporary Certificate Of Occupancy -Medium Project $1,404.00 15 DS-15810 Temporary Certificate Of Occupancy -Large Project $2,066.00 16 Technology Fee Of Building
Permit Fee 7.5%
17 Inspections outside of normal business hours per hour (minimum charge -- two hours) $252.00 18 Re-inspection fee assessed under CBC Section C.B.C per hour ** Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
$252.00
19 Additional plan review required by changes, additions or revisions to approved plans per hour (minimum charge -- one hour) $168.00 20 New Construction Fee $543
$543.00 or $.33
per sq ft
whichever is
greater
21 Job Valuation Fee > $12,000
This differs from the job valuation table via the ICC. This fee is applied for valuations over $12,000 to contractors, and owner builders. 0-$12,000 (no fee), $12,001-$35,0000 ($10 plus $1 per each $1,000 or fraction thereof in excess of $12,000), $35,001-$70,000 ($30 plus $.75 per each $1,000 or fraction thereof in excess of $35,000), $70,001 - $120,000 ($56.25 plus $.50 per each $1,000 fraction thereof in excess of $70,000), $120,001 - $500,000 ($81.25 plus $.375 per each $1,000 or fraction thereof in excess of $120,000), $500,001 - $1,000,000 ($223.75 plus $.25 per each $1,000 fraction thereof in excess of $500,000), $1,000,001 and up ($348.75 plus $.15 per each $1,000 fraction thereof in excess of $1,000,000)
22 Affordable Housing Compliance Monitoring Fee by Unit Count 0-9 units $458.27 23 Affordable Housing Compliance Monitoring Fee by Unit Count 10-25 units $781.50 24 Affordable Housing Compliance Monitoring Fee by Unit Count 26-50 units $1,148.20 25 Affordable Housing Compliance Monitoring Fee by Unit Count 51-100 units $1,472.07 26 Affordable Housing Compliance Monitoring Fee by Unit Count 101-200 units $2,037.49 27 Affordable Housing Compliance Monitoring Fee by Unit Count 201-300 units $2,553.77 28 New Home Security Fee $100 $100
Note:

Expedite Fee: 100% surcharge on all fees
1 Minimum
Value
Maximum
Value Base Rate Plus $$ For every
1 500 25.66 0.00 0
501 2,000 25.66 2.05 100
2,001 25,000 46.19 9.24 1,000
25,001 50,000 258.68 6.67 1,000
50,001 100,000 425.49 4.62 1,000
100,001 500,000 656.45 3.59 1,000
500,001 1,000,000 2,093.56 3.08 1,000
1,000,001 + 3,633.32 2.05 1,000
Building Valuation Table
Current (All New Construction)
1 Public Works - Engineering
#
Service Center
# Service Center Name Base Fee/Subcategory Unit Notes 2026 Fee 1 PW-00510 Grading Plan-Roughs (Maximum 3 Plan Checks) Minimum For 5 To 10 Acres Per Sheet $880.00 2 PW-00520 Grading Plan Check (Maximum 3 Plan Checks) Base Fee For First 10 Acres NA 3 Plus For Each Additional 5 Acres NA
4 PW-00530 Grading Plan Check-Precise (Maximum 3 Plan Checlks) Base Fee First Acre Per Sheet $1,250.00 5 Plus Additional Acre Or Portion Thereof, Up To 10 Acres NA 6 PW-00540 Grading Plan Check-Precise (Maximum 3 Plan Checks) Base Fee First 10 Acres NA 7 Plus Each Additional 5 Acres NA
8 PW-00550 Grading Inspection-Rough Base Fee First 5 Acres $2,520.00 9 Plus Each Additional 5 Acres $162.00
10 PW-00560 Grading Inspection-Precise- 0 To 10 Acres Base Fee First Acre $6,840.00 11 Plus Each Additional Acre Or Portion Thereof, Up To 10 Acres $105.00 12 PW-00570 Grading Inspection-Precise- Greater Than 10 Acres Base Fee First 10 Acres $7,918.00 13 Plus Each Additional 5 Acres $105.00
14 PW-00590 Preliminary & Final Hydrology Study Review Base Fee First 3 Acres $2,255.00 15 Plus Every Acre Or Portion Thereof Above 3 Acres $326.00 16 PW-00592 Erosion Control Plan Review (Maximum 3 Plan Checks) Base Fee First 5 Acres $1,237.00 17 Plus Each Additional 5 Acres Or Portion Thereof $174.00 18 PW-00594 Geotechnical Soil Report Review $1,478.00
19 PW-00910 Final Subdivision Map-Tract (Maximum 3 Plan Checks) Base Fee $6,607.00 20 Plus Per Lot $62.00
21 PW-00920 Final Subdivision Map-Parcel (Maximum 3 Plan Checks) First Lot $4,948.00 22 Plus Per Lot $62.00
23 PW-01321 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 Plan Checks) $0 To $25,000 Plus 10.8% Of Amount > $10,000 $2,367.00 24 PW-01322 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 Plan Checks) $25,001 To $75,000 Plus 5.2% Of Amount > $25,000 $4,030.00 25 PW-01323 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 Plan Checks) $75,001 To $125,000 Plus 5.1% Of Amount > $75,000 $6,694.00 26 PW-01324 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 Plan Checks) $125,001 To $200,000 Plus 4.9% Of Amount > $125,000 $9,296.00 27 PW-01325 Engineering Plan Check--Fee Based On Job Valuation (Maximum 3 Plan Checks) $200,001 And Above Plus 1.5% Of Amount > $200,000 $13,053.00 28 PW-01340 Inspection Of Residential Driveway $463.00
29 PW-01341 Inspection Of Commercial Driveway $686.00
30 PW-01342 Inspection Of Utility Service Cut Less Or Equal To 5'X20' $408.00 31 PW-01343 Inspection Of Sidewalk Less Than 150 Sq.Ft $299.00 32 PW-01344 Simple Inspection-Traffic Control $461.00
33 PW-01400 Revision Of Engineering Plans $1,005.00
34 PW-01500 Traffic Impact Analysis Review Actual Cost/FBHR Assigned Staff
35 PW-01550 Traffic Control Plan Review (Maximum 3 Plan Checks) Actual Cost/FBHR Assigned Staff
36 PW-01600 Public/Private Improvement Inspection Minimum Plus 4.8% Of The Estimated Value Of Construction $917.00
37 PW-03400 Right-Of-Way (R.O.W.) Encroachment $492.00
38 PW-03401 Right-Of-Way (R..O.W.) Encroachment Permit Extension Request Fee $129.00 39 PW-03402 New Dedication of R-O-W (Actual) $2,100 depost is collected upfront and the remaining amount is refunded if any.

Actual Cost/FBHR
Assigned Staff
40 PW-03410 Newsrack Permit Per Publication -
One Time Fee $137.00
41 PW-03420 Right-Of-Way (R.O.W.) Encroachment - Minor $289.00 42 PW-03500 Wide/Overweight Vehicle Permit
Current Fees As Allowed By State And Actual Cost For
Additional Plan Checking And Inspection For Excessive Loads ($90 annual, $16 single trip)
Actual Costs
43 PW-03610 Lot Line Adjustment (Flat fee) $2,101.00
44 PW-03630 Deeds Of Right-Of-Way/Easement/Summary Vacation (Maximum 3 Plan Checks) $2,253.00 45 PW-03700 Detour/Lane Closure Permit $312.00
46 PW-03800 Survey Monument Restoration Base Fee Plus Cost Of Licensed Surveyor $281.00 47 PW-11200 After Hours Inspection Actual Costs Using Fully Burdened Rates Actual Costs 48 PW-13210A Public Utility/Public Agency Inspection-Value Less Than $1,000 $668.00 49 PW-13210B Public Utility/Public Agency Inspection-Value Between $1,001 And $100,000 Base Plus 3.3% Of Construction Cost $764.00
50 PW-13220 Public Utility/Public Agency Inspection-Value Greater Than $100,000 Base Plus .8% Of The Cost Over $100,000 $3,407.00
51 PW-15600 Preliminary & Final Water Quality Management Plan Review First 5 Acres $3,491.00 52 Plus Each Additional 5 Acres $411.00
53 PW-10010 Small Wireless Facility Application Each Application $627.00 54 PW-10011 Sewer Annexation Application Each Application $547.00 55 City Attorney/Legal Review For Public Improvement Agreements per hr minimum 1 hour $394.00 56 General Vacation of Right-of-Way $2,968.00
57 Certificate of Correction $512.00
58 Traffic Sign Bagging/Unbagging each request $213.00
1 Public Works
#
Service
Center # Service Center Name Base Fee/Subcategory Unit Notes 2026 Fee 1 PW-07600 Water Meter Installation
City Installed, Jumper Included
Plus Cost Of Meter For 3/4" To 1"
Meters $499.00
2 City Installed, No Jumper Plus
Cost Of Meter For 1 1/2" To 2"
Meters
$480.00
3 Developer Installed, No Jumper
Plus Cost Of Meter For Meters
Larger Than 2"
$352.00
4 PW-07610 Water Meter Downsize Or Upgrade Plus Meter Cost (Customer Responsible For Meter Installation Greater Than 2")$319.00
5 PW-07900Delinquent Processing Charge Fee $193.00
6 Fee If Meter Lock Has Been
Tampered With $76.00
7 Fee If Water Valve Has Been
Tampered With Plus Cost Of The
Valve
$766.00
8 PW-08100Sewer Stoppage Investigation $62.00
9 PW-08200Sewer Dye Test $136.00
10 PW-08300Industrial User Discharge Permit--Application $161.00 11 PW-08310 Industrial User Discharge Permit Processing-Significant Discharger $399.00
12 PW-08311Industrial User Discharge Permit Processing-Class I & II $303.00 13 PW-08315 Industrial User Discharge Permit Processing-Non-Discharger $174.00 14 PW-08320 Industrial User Discharge Inspection-Significant Discharger $450.00 15 PW-08325Industrial User Discharge Inspection-Class I $241.00 16 PW-08326Industrial User Discharge Inspection-Class II $252.00 17 PW-08327Industrial User Discharge Inspection-Non-Discharger $172.00 18 PW-08333 Industrial User Discharge Permit-Sampling
Base Fee If Performed By City
Staff; Actual Cost If Processed By
Contract Company$24

9.00 19 PW-08344 Industrial User Discharge Permit Modification $261.00 20 PW-08350 Industrial Permit Sample Analysis Base Fee Plus Cost Of Outside Laboratory Work $51.00 21 PW-12500 Fire Hydrant Flow Test Field Test $409.00
22 PW-12550 Backflow Device Penalty Field Test $352.00
23 PW-15601 Water Quality Management Plan Inspection $160.00 24 PW-15610 Industrial User Wastewater Enforcement / Investigation $265.00 25 PW-15620 Storm Water Inspection $130.00
26 PW-04700 Graffiti Vandalism Cost Recovery Per Sq. Ft. Plus Max Allowed By Court For Police Investigation $12.00
27 Grease interceptors waivers for food service establishments $323.00 1 Public Works - Engineering
#
Service Center
# Service Center Name Base Fee/Subcategory Unit Notes 2026 Fee 59 Center Line Ties/Land Surveyor per sheet plus
20% Admin fee $618.00
60 Road Closure Permit Policy 1-10 days; Up to $100,000 Value of Work Being Completed refundable deposit $1,000 per day rate $20,000.00
61 Road Closure Permit Policy 10-30 days; $100,001 - $500,000 Value of Work Being Completed
refundable
deposit $1,500 per day rate $30,000.00
62 Road Closure Permit Policy 31-90 days; $500,001 - $1,000,000 Value of Work Being Completed
refundable
deposit $2,000 per day rate $60,000.00
63 Road Closure Permit Policy 91-180 days; $1,000,001 - $3,000,000 Value of Work Being Completed
refundable
deposit $3,000 per day rate $100,000.00
64 Road Closure Permit Policy Over 180 days; Over $3,000,001 Value of Work Being Completed
refundable
deposit $5,000 per day rate $300,000.00
65 Refundable Deposits Public Improvements/Monumentation refundable deposit
Based on Eng Cost
Est.
66 Bond Substiituition $2,815.00
67 Sewer Study
Actual Cost
consultant, plus 15%
Admin
NOTE:

Additional fees may be assessed at City discretion if plan check exceeds three rounds of review 1-2% Subsidy is due to rounding issue
Expedite Fee: 100% surcharge on all fees
2 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item

STREETS
EA Tree Removal 901.12$ -$
CY Concrete Removal 366.59$ -$
CY AC Pavement Removal 112.64$ -$
CY Imported Common Fill (Incl. Compaction) 37.89$ -$ SF Preparation of Subgrade, Sidewalk and Paving 1.13$ -$ LF PCC 8" Curb & 24" Gutter on 6" AB 29.70$ -$ LF PCC 6" Curb & 24" Gutter on 6" AB 26.62$ -$ LF PCC Curb Only 22.53$ -$
LF 8" A.C. Berm 22.53$ -$
SF 8" PCC Cross Gutter on 6" AB 18.43$ -$ SF 4" PCC Sidewalk 6.55$ -$
SF 6" PCC Thick Drive Approach on 6" AB 14.08$ -$ SF 8" PCC Thick Drive Approach on 6" AB 16.90$ -$ LF 2" x 6" Redwood Header 8.45$ -$
EA Street Sign and Post 535.55$ -$
EA Traffic Sign and Post 450.56$ -$
EA Reflector Sign and Post 197.63$ -$
EA Painted Legend 7.17$ -$
SF Prime or Tack Coat 0.09$ -$
TON AC Variable - <300T 146.43$ -$
TON AC Variable - >300T 135.17$ -$
TON CAB Variable - <300T 112.64$ -$
TON CAB Variable - >300T 101.38$ -$
EngCostEstimate Page 1 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item

STREETS
EA Adjust Sewer Manhole to Grade 1,070.08$ -$
EA Adjust Sewer Cleanout to Grade 563.20$ -$ EA Adjust Water Valve and Can to Grade 591.87$ -$ EA Street Light (City Owner) 8,673.28$ -$
EA Electrical Pedestal 7,321.60$ -$
EA Lot Monument Setting Fee 619.52$ -$
LF Sawcut A.C. 3.38$ -$
LF Sawcut Concrete 3.38$ -$
SF Cold Plane A.C. 2" Thick 0.32$ -$
LF Signing & Striping for
Arterial 21.50$ -$
Collector 14.34$ -$
Local 8.19$ -$
EA Traffic Signal (8 - Phase Controller) 394,240.00$ -$ EA Modify existing Traffic Signal per Quadrant 84,480.00$ -$ LF Chain Link Fence
4 foot Residential Grade (Add $7.00/LF for Removal
of Existing Fence) 28.67$ - $
6 foot School fence (Add $9.00/LF for Removal of
Existing Fence) 39.94$ - $
EA Utility Poles
Transmission 12,953.60$ -$
Distribution 9,011.20$ -$
Service 3,379.20$ -$
EngCostEstimate Page 2 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item

STREETS
SF
Landscape (Including shrubs, Hardscape, Irrigation,
Ground Cover, Lighting, Installation Labor and Connection to Existing Systems) 17.41$ - $
LF
14 foot Median with Landscape, Irrigation, Lighting,
Hardscape, Curb, Gutter & Pavement 337.92$ - $ Rail Road Crossing
LS
Safety Equipment (Complete Including Crossing
Gates, Signs, and Lights) 563,200.00$ - $
SF Track Crossing (Concrete) 197.63$ -$
SF Approach 4.51$ -$
EA S.W. Ramps (A.D.A. Compliant) 4,505.60$ -$
EA Traffic Signal Loops 675.84$ -$

STREETS
STREET SUBTOTAL - $
LS Mobilzation (5% of Construction Cost) 5% -$
LS Traffic Control (5% of Construction Cost) 5% -$
LS Clear & Grub Site (5% of Construction Cost) 5% -$
LS Excavation (Clean Material) (5% of Construction Cost) 5% -$ GRAND TOTAL STREETS ONLY -$
EngCostEstimate Page 3 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item
WATER
LF Trench Support/Shoring (6 foot depth) 17.41$ -$ CY Pipe Bedding & Compaction (Imported) 101.38$ -$ LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration 90.11$ - $ LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. 112.64$ - $ LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration 152.58$ - $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration 197.63$ - $ LF Removal, Disposal of ACP and Backfill 168.96$ -$ EA 6" Gate Valve 2,252.80$ -$
EA 8" Gate Valve 2,928.64$ -$
EA 12" Gate Valve 5,068.80$ -$
EA 18" Gate Valve 8,448.00$ -$
EA Fire Hydrant Assembly per City Std. 8,448.00$ -$ EA Blow-off Assembly 4" per City Std. 9,687.04$ -$ EA 2" Air Relief Assembly 5,068.80$ -$
EA 1" Water Service/Meter 3,942.40$ -$
EA 2" Water Service/Meter 5,068.80$ -$
WATER
WATER SUBTOTAL -$
LS Mobilzation (5% of Construction Cost) 5% -$
LS Traffic Control (5% of Construction Cost) 5% -$
GRAND TOTAL WATER ONLY -$
EngCostEstimate Page 4 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item

RECYCLED WATER
LF Trench Support/Shoring (6 foot depth) 17.41$ -$ CY Pipe Bedding (Imported) 101.38$ -$
LF
6" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration 90.11$ - $ LF
8" Pipe & Fittings Installed, including excavation, bedding, backfill and pavement restoration. 112.64$ - $ LF
12" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration 152.58$ - $ LF
18" Pipe & Fittings Installed, including excavation,
bedding, backfill and pavement restoration 197.63$ - $ EA 6" Gate Valve 2,252.80$ -$
EA 8" Gate Valve 2,928.64$ -$
EA 12" Gate Valve 5,068.80$ -$
EA 18" Gate Valve 8,448.00$ -$
EA Fire Hydrant Assembly per City Std. 8,448.00$ -$ EA Blow-off Assembly 5" per City Std. 9,687.04$ -$ EA 2" Air Relief Assembly 5,068.80$ -$
EA 1" Water Service/Meter 3,942.40$ -$
EA 2" Water Service/Meter 5,068.80$ -$

RECYCLED WATER
RECYCLED WATER SUBTOTAL -$
LS Mobilzation (5% of Construction Cost) 5% -$
LS Traffic Control (5% of Construction Cost) 5% -$
GRAND TOTAL RECYCLED WATER ONLY -$
EngCostEstimate Page 5 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item
SEWER
LF Trench Support/Shoring 17.41$ -$
LF
4" Installed, including excavation, bedding, backfill and pavement restoration 84.99$ - $
LF
8" Installed, including excavation, bedding, backfill and pavement restoration 104.45$ - $
LF
10" Installed, including excavation, bedding, backfill and pavement restoration 115.71$ - $
LF
12" Installed, including excavation, bedding, backfill and pavement restoration 138.24$ - $
LF
15" Installed, including excavation, bedding, backfill and pavement restoration 160.77$ - $
LF
18" Installed, including excavation, bedding, backfill and pavement restoration 183.30$ - $
LF
21" Installed, including excavation, bedding, backfill and pavement restoration 217.09$ - $
LF
24" Installed, including excavation, bedding, backfill and pavement restoration 234.50$ - $
EA Sewer Saddle 506.88$ -$
EA Wyes 4" x 8" Typical 253.95$ -$
EA 48" Sewer Manhole 5,294.08$ -$
EA 60" Sewer Manhole 8,448.00$ -$
EA Sewer Cleanout 2,027.52$ -$
SEWER
SEWER SUBTOTAL -$
LS Mobilization (5% of Construction Cost) 5% -$
LS Traffic Control (5% of Construction Cost) 5% -$
GRAND TOTAL SEWER ONLY -$
EngCostEstimate Page 6 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item

STORM DRAIN
LF 24" X 36" C.M.P.A. (10 Gauge) 259.07$ -$
LF 27" x 43" C.M.P.A (10 Gauge) 281.60$ -$
EA Storm Drain Manhole #1 11,264.00$ -$
EA Junction Structure #2 (24" or larger) 9,968.64$ -$ EA Junction Structure #4 (24" or smaller) 4,505.60$ -$ EA Outlet Structure 7,884.80$ -$
EA Catch Basin 3.5' Width 8,110.08$ -$
EA Catch Basin 7' Width/L.D. 8,898.56$ -$
EA Catch Basin 10' Width/L.D. 11,207.68$ -$
EA Catch Basin 14' Width/L.D. 12,390.40$ -$
EA Catch Basin 21' Width/L.D. 14,643.20$ -$
LF
18 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 225.28$ - $ LF
24 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 270.34$ - $ LF
27 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 292.86$ - $ LF
30 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 315.39$ - $ LF
33 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 332.80$ - $ LF
36 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 349.18$ - $ LF
39 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 360.45$ - $ LF
42 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 371.71$ - $ LF
45 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 405.50$ - $ LF
48 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 434.18$ - $ LF
54 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 495.62$ - $ LF
60 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 563.20$ - $ EngCostEstimate Page 7 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item

STORM DRAIN
LF
66 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 630.78$ - $ LF
72 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 704.51$ - $ LF
78 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 777.22$ - $ LF
84 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 862.21$ - $ LF
90 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 934.91$ - $ LF
96 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 1,036.29$ - $ LF
102 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 1,126.40$ - $ LF
108 inch RCP Installed, including excavation, bedding,
backfill and pavement restoration 1,211.39$ - $ LF
7' x 6' RCB Installed, including excavation, bedding,
backfill and pavement restoration 788.48$ - $ LF
7' x 8.5' RCB Installed, including excavation, bedding, backfill and pavement restoration 923.65$ - $ LF
7' x 9.5' RCB Installed, including excavation, bedding, backfill and pavement restoration 979.97$ - $ LF
8' x 11' RCB Installed, including excavation, bedding,
backfill and pavement restoration 1,126.40$ - $ LF
8' x 13' RCB Installed, including excavation, bedding,
backfill and pavement restoration 1,239.04$ - $ LF
9' x 9' RCB Installed, including excavation, bedding,
backfill and pavement restoration 1,126.40$ - $ LF
9' x 12' RCB Installed, including excavation, bedding,
backfill and pavement restoration 1,239.04$ - $ LF
4' x 6' RCB Installed, including excavation, bedding,
backfill and pavement restoration 765.95$ - $

STORM DRAIN
STORM DRAIN SUBTOTAL -$
LS Mobilization (5% of Construction Cost) 5% -$
LS Traffic Control (5% of Construction Cost) 5% -$
GRAND TOTAL STORM DRAIN ONLY -$
EngCostEstimate Page 8 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item
DIRECT COSTS GRAND TOTAL STREETS ONLY - $
GRAND TOTAL WATER ONLY -$
GRAND TOTAL RECYCLED WATER ONLY -$
GRAND TOTAL SEWER ONLY -$
GRAND TOTAL STORM DRAIN ONLY -$

GRAND TOTAL (FOR PLAN CHECK & INSPECTION FEE
DETERMINATION) -$
PROJECT ADDITIVES Project Contingencies 10% -$
Construction Staking 3% -$
Soils Testing 1% -$
Material Testing 1% -$
Construction Inspection 4.8% -$
Contract Administration 1% -$
GRAND TOTAL (FOR BOND AMOUNTS) -$
EngCostEstimate Page 9 of 10 Effective Date: August 18, 2025 RESOLUTION NO 2025-029

CITY OF CHINO

ENGINEERING COST ESTIMATE
PROJECT NO:

LOCATION :

By:

DATE:

Quantity Unit Item Unit Total Cost
Price Per Item

BY ENGINEER
Prepared By:

R.C.E. Number:

Expiration:

Place R.C.E. Stamp and Signature Here (required)

BY CITY
Faithful Performance Bond (100% of Construction Cost) -$ Labor & Material Bond (50% of Construction Cost) -$
Warranty Bond (10% of Construction Cost) -$
EngCostEstimate Page 10 of 10 Effective Date: August 18, 2025

← All documents from this meeting