Cities Index.
Attachment 2 - Bayshore Bikeway Exhibit.pdf

Chula Vista City Council
June 7, 2022

Document
Attachment 2 - Bayshore Bikeway Exhibit.pdf
Meeting
June 7, 2022
Body
Chula Vista City Council
Original file
5.0 MB
Text extracted from the city's file for reading and search. Open the original on pub-chulavista.escribemeetings.com. That file is the official record.

LAGOON DRIVE

BAY BOULEVARD
BAY BOULEVARDCONSTRUCT CLASS 1

SHARED USED PATH

PROTECT IN PLACE

EXISTING INACTIVE RAIL

SD&AERAIL R/W

SEE DETAIL BELOW
CONSTRUCT CLASS 1

SHARED USED PATH
A
A

CITY OF CHULA VISTA R/W

CITY OF

CHULA VISTA R/W

SEE DETAIL BELOW
CONSTRUCT ~200' OF BRIDGE
5' 5' 2'2' ±25'1'
MIN
14' CLASS 1 SHARED USE PATH
± 40' SD&AE R/W

PROTECT IN PLACE

EXISTING INACTIVE RAIL

8.5' MIN FROM CL OF RAIL

PROPOSED FENCING

PROPOSED FENCING
4"AC/8"AB

RAMP TO BE CONSTRUCTED (BY

OTHERS) BY FUTURE SWEETWATER
BICYCLE PATH PROJECT MID-2021

RAMP TO BE CONSTRUCTED (BY

OTHERS) BY FUTURE SWEETWATER
BICYCLE PATH PROJECT MID-2021

RAMP TO BE CONSTRUCTED (BY

OTHERS) BY FUTURE SWEETWATER
BICYCLE PATH PROJECT MID-2021
CLASS 1 SHARED USED

PATH TO BE CONSTRUCTED
(BY OTHERS) BY FUTURE

SWEETWATER BICYCLE
PATH PROJECT MID-2021

EXISTING BAYSHORE BIKEWAY

ROAD EXTENSION TO BE CONSTRUCTED
(BY OTHERS) BY FUTURE SWEETWATER
BICYCLE PATH PROJECT MID-2021

XING TO BE CONSTRUCTED (BY

OTHERS) BY FUTURE SWEETWATER
BICYCLE PATH PROJECT MID-2021

XING TO BE CONSTRUCTED (BY

OTHERS) BY FUTURE SWEETWATER
BICYCLE PATH PROJECT MID-2021

CONSTRUCT PED XING

CONNECT TO FUTRE

BAYSHORE BIKEWAY

SEGMENT

CONSTRUCT BIKE HAWK XING

CONSTRUCT PEDESTRIAN RAMP

CONSTRUCT PEDESTRIAN RAMP

CONSTRUCT PEDESTRIAN RAMP

CONSTRUCT HAWK TRAFFIC SIGNAL
(INCLUDING FOUNDATION, POLE, MAST

ARMS ,SIGNALS, LUMINAIRE)

CONSTRUCT HAWK TRAFFIC SIGNAL
(INCLUDING FOUNDATION, POLE, MAST

ARMS ,SIGNALS, LUMINAIRE)
Bayshore Bikeway - Chula Vista Segment
Proposed Project Plan and Cross Section
9/8/2020
Sheet 1 of 1
C:\CRA_SP\Chen Ryan\262-Chula_Vista_ATP - Files\CAD\Exhibits\262_Exh_Sheet 1.dwg Plot: Izzad J. Loh Date: 9/15/2020 8:44:00 N
0' 50' 100'

PROPOSED CONNECTION TO BAYSHORE BIKEWAY

AT BAY BLVD AND GUNPOWDER POINT DR
SCALE: 1" = 20'

PROPOSED LAGOON DR TRAIL CROSSING
SCALE: 1" = 20'

PROPOSED SECTION THROUGH SD&AE R/W

NOT TO SCALE

CONNECT TO FUTURE BAYSHORE BIKEWAY /

SWEETWATER BICYCLE PATH JUNCTION

PROPOSED BAYSHORE
BIKEWAY SEGMENT 6A
Attachment 2

← All documents from this meeting