Cities Index.
Attachment 2 - Bayshore Bikeway - Lagoon Dr to H St Exhibit.pdf

Chula Vista City Council
October 25, 2022

Document
Attachment 2 - Bayshore Bikeway - Lagoon Dr to H St Exhibit.pdf
Meeting
October 25, 2022
Body
Chula Vista City Council
Original file
605 KB
Text extracted from the city's file for reading and search. Open the original on pub-chulavista.escribemeetings.com. That file is the official record.

LAGOON DRIVE

G STREET

H STREET
F ST

BAY BOULEVARD

BAY BOULEVARD

X X X X X X X X X X X

X X X X X X X X X X X X

X X X X X X X X X X X

X X X X X X X X X X X X XXXXXXXXXXXXXXX
XXXXX
X
X
X

XXXXXXXXXXXXXXX
XXXXX
X
X
X
XING
BIKE
XING
BIKE
XING
BIKE

XINGBIKE

XINGBIKE
XING
BIKE
XXX
XXX
X X X
X X X
XING
BIKE
XING
BIKE
XING
BIKE
XING
BIKE
5'5'2' 2'±27'
14' CLASS 1 SHARED USE PATH
± 40' SD&AE R/W

PROTECT IN PLACE

EXISTING INACTIVE RAIL

8.5' MIN FROM CL OF RAIL

PROPOSED FENCING PROPOSED FENCING
±260-360' TO BAY BOULEVARD

X X X X

X X X X
XXXX
XX
XX
XING
BIKE
XING
BIKE
5'5'2' 2'
14' CLASS 1 SHARED USE PATH
± 40' SD&AE R/W

REMOVE OR BURY

EXISTING INACTIVE RAIL

4.7' - 6.8'7.5' - 13'

EXISTING

UNNAMED ROAD

EXISTING

PARKING LOT

PROPOSED FENCINGPROPOSED FENCING

ACCESS TO EXISTING

WAREHOUSE BUILDINGS
Bayshore Bikeway - Chula Vista Segment
Proposed Project Plan and Cross Section
9/29/2022
Sheet 1 of 1
Q:\_Projects\STM0369 - ADV Planning (Signing-Striping)\Bayshore Bikeway\CAD\STM0369_6B Exhibit.dwg Plot: Yan Liu Date: 9/29/2022 2:06:47 PM

LAGOON DR BIKE PATH CROSSING
(TO BE CONSTRUCTED WITH SEGMENT 6A)
SCALE: 1'=20'

PROPOSED H ST BIKE PATH CROSSING
SCALE: 1'=20'

PROPOSED SECTION - LAGOON DR TO G ST

NOT TO SCALE

SEE DETAIL BELOW

SEE DETAIL BELOW
CONSTRUCT CLASS 1

SHARED USE PATH

CITY OF CHULA VISTA R/W

CITY OF CHULA VISTA R/W
SD&AE

RAIL R/W
SEGMENT 6A'S HAWK TRAFFIC SIGNAL
(INCLUDING FOUNDATION, POLE,

MAST ARMS, SIGNALS, LUMINAIRE)
SEGMENT 6A'S HAWK TRAFFIC SIGNAL
(INCLUDING FOUNDATION, POLE,

MAST ARMS, SIGNALS, LUMINAIRE) PEDESTRIAN RAMP

PEDESTRIAN RAMP

BIKLE HAWK XING

BAYSHORE BIKEWAY
SEGMENT 6A CONNECTION

BAYSHORE BIKEWAY
SEGMENT 6B (PROPOSED)

BAYSHORE BIKEWAY
SEGMENT 6B (PROPOSED)

CONSTRUCT PEDESTRIAN RAMP

CONSTRUCT HAWK TRAFFIC SIGNAL
(INCLUDING FOUNDATION, POLE,

MAST ARMS, SIGNALS, LUMINAIRE)

CONSTRUCT PED XING

CONSTRUCT HAWK TRAFFIC

SIGNAL (INCLUDING

FOUNDATION, POLE, MAST

ARMS, SIGNALS, LUMINAIRE)

PEDESTRIAN XING

CONSTRUCT BIKE HAWK XING

CONSTRUCT PEDESTRIAN RAMP

CONNECT TO EXISTING
CLASS 1 BIKE PATH
Feet
0100200

PROPOSED G ST BIKE PATH CROSSING
SCALE: 1'=20'

REMOVE OR BURY EXISTING INACTIVE RAIL
CONSTRUCT CLASS 1

SHARED USE PATH

REMOVE OR BURY

EXISTING INACTIVE RAIL

CONSTRUCT PEDESTRIAN RAMP
(INCLUDING YIELD

SIGNING & STRIPING)CONSTRUCT PEDESTRIAN RAMP
(INCLUDING YIELD

SIGNING & STRIPING)

CONSTRUCT PED XING

REMOVE OR BURY

EXISTING INACTIVE RAIL

REMOVE OR BURY

EXISTING INACTIVE RAIL

PROPOSED SECTION - G ST TO H STREET

NOT TO SCALE

SEE DETAIL BELOW

PROTECT IN PLACEEXISTING INACTIVE RAIL
LAGOON DRIVE TO G STREET = 1
4 MILEG STREET TO H STREET = 1
4 MILE
ATTACHMENT 2

← All documents from this meeting