12.1.2022C2 Building Group Qualifications
License: 996486
Local, Trusted,
Technical Builder.

C2 BUILDING GROUP
.02
4 5
15 25
27 29
30 Intro Cover Letter
Experience
Team
Revenue
References
Insurance
Conclusion
TABLE OF CONTENTS C2 BUILDING GROUP
.03

JOSH CHESNUT JEFF COLE
Introduction
C2 Building Group was formed in 2014 with a desire to build a great team working for great people doing what we love as builders. Josh and Jeff worked at DPR Constuction for 10 years and have extensive experience on large ground up projects. Our team hopes to be selected to work on this project as we are confident we can exceed expectations on the delivery of the project and within the project goals. We are headquartered in Solana Beach, Ca and are focused on staying a local San Diego technical builder. We look forward to the opportunity to work with your team on delivering this exciting project.

Key Data:

Year of Establishment: 2014
HQ: Solana Beach, Ca
Professional & Admin: 27 FTE
Operations & Field - 36 FTE
Payment Terms - 30 to 45 days
Gratefully,
INTRODUCTION C2 BUILDING GROUP
.04
.05
AnaptysBio TI
PROJECT SIZE: 39,336 SF
DURATION: 28 WEEKS
CUSTOMER: ANAPTYSBIO
PROJECT COMPLETED APRIL 2021
OWNER CONTACT: BRIAN BRADY
ARCHITECT: MCFARLANE
The AnaptysBio TI project features a second floor build out over an existing and operating lab tenant on the first floor. This buildout was finished only 14 weeks after the permit was issued and the team worked closely with the tenant during the project to ensure all the goals were met. The project was succesfully completed in April 2021.

This project demostrated C2 Building Group’s ability to deliver high end finishes and meet the technical requirements of AnaptysBio.

The project was divided into 2/3 lab and 1/3 office at Bioscience Properties’ campus at 10770 Waterridge. The scope included various new lab spaces with DI, compressed air, vacuum, N2, O2, and CO2 equipment and piping as well as a cold room and all new mechanical and electrical equipment including emergency power.

EXPERIENCE C2 BUILDING GROUP
Crown Bioscience TI
This lab and vivarium project consisted of
design-build construction of a 30,000 SF
space to meet the custom requirements for
Crown Bioscience. The scope included entirely
new mechanical systems to meet specialized
pressurization and isolation requirements, new
electrical systems including a tie-in to a back-up
generator and all new plumbing systems such as
compressed air, CO2, and O2. This project was
designed, permitted, and built on time and on
budget.

PROJECT VALUE: $5.4 MILLION
CUSTOMER: CROWNBIO
PROJECT COMPLETED FEBRUARY 2019
OWNER CONTACT: JAYANT THATTE, CROWN BIO
ARCHITECT: FPBA
EXPERIENCE C2 BUILDING GROUP
.06
.07
The Yard
Repositioning
Project
PROJECT SIZE: 45,000 SF
DURATION: 20 WEEKS
CUSTOMER: LOCALE
OWNER CONTACT: BRIAN BRADY
ARCHITECT: RIOS AND WARE MALCOMB
The Yard project is a great example of a cost effective repositioning project. C2 worked with Hollywood designer Rios Clemente Hale to achieve the design trends and rendering images with a practical budget. The project features painted tenant entries, painted stripes on the tilt up panels, and new landscaping and a steel and wood trellis in the courtyard area.

This project demostrated C2 Building Group’s ability to deliver high end design goals with a practical budget and in a tight timeline.

EXPERIENCE C2 BUILDING GROUP
.08
Space Craft
2051 PAR
PROJECT SIZE: 122,336 SF
CUSTOMER: STEELWAVE
PROJECT COMPLETED APRIL 2020
This project was over $8M and is a great example of a repositioning project. The project included a new open lobby entry featuring new heavy raw steel, new curtainwall glazing entrance, elevator screen, landscaping on the entire site, and a new outdoor amenity space.

The project was succesfully completed in April 2020.

EXPERIENCE C2 BUILDING GROUP
.09
SOVA Science
District
PROJECT SIZE: 14 BUILDINGS
DURATION: 28 WEEKS
CUSTOMER: LONGFELLOW
PROJECT COMPLETED AUGUST 2020
ARCHITECT: DGA
C2 Building Group is very proud of the work we delivered at the SOVA Science District. Our team worked closely with DGA to provide a cost-effective, practical solution to achieve the yellow facade panels on the renderings. The project included facade upgrade, a new fitness center, coffee shop, and outdoor amenity space.

EXPERIENCE C2 BUILDING GROUP
.10
TriLink TI
PROJECT SIZE: 14,300 SF
DURATION: 12 WEEKS
CUSTOMER: TRILINK
PROJECT COMPLETED FEBRUARY 2021
OWNER CONTACT: BRIAN BRADY
ARCHITECT: MCFARLANE
The TriLink Office Expansion project consisted of a 14,300 SF TI for the TriLink executive team. The timeline was expedited to support the company’s expansion due to being tied to the development of the COVID-19 vaccine. This project was a great example of what a team can accomplish with a common goal. The project was succesfully completed in February 2021.

This project demostrated C2 Building Group’s ability to manage an accelerated schedule in the current market. C2 was able to drive procurement and provide solutions to support an expedited schedule and move-in process without compromising quality or the high expectations of the team.

EXPERIENCE C2 BUILDING GROUP
Nautilus III Lab TI
This project consisted of a 25,000 SF buildout
of a new lab space for Fate Therapeutics in the
Nautilus campus in Torrey Pines. This space
features half lab and half office including custom
lab benches, fume hoods, tissue culture rooms,
and open creative office space with custom
wood ceilings and high end architectural
woodwork.

PROJECT VALUE: $6.2 MILLION
CUSTOMER: ALEXANDRIA REAL ESTATE
PROJECT COMPLETED DECEMBER 2019
ARCHITECT: GENSLER
EXPERIENCE C2 BUILDING GROUP
.11
.12
Abbott Rapid
Diagnostics
PROJECT SIZE: 46,000 SF
PROJECT VALUE: $5.2 WEEKS
CUSTOMER: ABBOTT
PROJECT COMPLETED APRIL 2019
OWNER CONTACT: MIKE LAND, ABBOTT
ARCHITECT: FPBA
The Abbott Rapid Diagnostics project consisted of a 46,000SF tenant improvement buildout comprised of 1/4 office, 3/4 lab in Carlsbad.

The office and lab portions of the project were phased, requiring coordination with FPBA and the City to allow for early occupancy of the office. The project was succesfully completed in April 2019.

This project demostrated C2 Building Group’s ability to manage and buildout a dense lab space for a tenant with demanding and sophisticated requirements and commissioning/validation processes.

The scope included various new lab spaces for multiple functions, each with their own mechanical and plumbing requirements such as humidification, pressurization and gas services. C2 provided all new mechanical, plumbing and electrical equipment and all other finishes while working closely with Abbott throughout to ensure their needs were met.

EXPERIENCE C2 BUILDING GROUP
.13
EXPERIENCE C2 BUILDING GROUP
Past clients.

Current friends.
.14

Josh Chesnut, LEED AP
Josh Chesnut was born and raised in San Diego, Ca and began his career working with DPR Construction. He is passionate about delivering project results and exceeding client’s expectations. He and Jeff Cole founded C2 Building Group with the drive to create a company to service clients from a hands on relationship driven approach. He leads a company of talented individuals that share in his vision of breaking the mold of how projects are delivered. C2 Building Group specializes in projects in the Life Science, Hospitality and Creative Office Markets.

B.A., Managerial and Organizational
Communications, Point Loma
Nazarene University
USGBC LEED® Accredited
Professional BD+C
PRECONSTRUCTION MANAGER/PRINCIPAL | 18 YEARS INDUSTRY EDUCATION

RELEVANT EXPERIENCE

CERTIFICATIONS
PROJECT STAFFING C2 BUILDING GROUP
DermTech TI
San Diego, CA
Project Value: $17.0M
Project Size: 90,255 SF
Shire Regenerative
Medicine, Inc. FKA
Advanced BioHealing
San Diego, CA
Project Value: $94,000,000
Ground-up Biotech
Scripps Health | Scripps
Radiation Therapy Center
San Diego, CA
Project Value: $21,000,000
Project Size: 45,000 SF
Oberlin Owner, llc |
The Yard Shell/Core
Renovations
San Diego, CA
Project Value: $3,200,000
Project Size: 50,000 SF
La Jolla Institute
La Jolla, CA
Project Value: $33,981,000
Project Size: 144,000 SF
Anka Property Group |
Alta - 6th & Market
San Diego, CA
Project Value: $49,000,000
Project Size: 213,000 SF
.16
Abbott Rapid Diagnostics
Carlsbad, CA
Project Value: Non-disclosed
Lab & Office TI for Abbott Faraday
Project Size: 45,675 SF
UCSD Sulpizio
Cardiovascular Center
San Diego, CA
Project Value: $147,000,000
Project Size: 128,000 SF
Project Size: 45,675 SF
Jeff Cole
Jeff Cole was born and raised in Santa Barbara, Ca. He attended Point Loma Nazarene University and acquired a degree in History. After graduation he began his career in construction and joined DPR Construction. He is a talented leader on projects and has a drive for operations. He has formed lasting relationships in the San Diego market and has extensive experience in the Life Science market sector. He has led C2 Building Group in preconstruction, estimating, and operations since founding C2.

B.A., History, Point Loma Nazarene
University
OWNER- PRECON/OPERATIONS | 18 YEARS INDUSTRY EDUCATION

RELEVANT EXPERIENCE
PROJECT STAFFING C2 BUILDING GROUP
Alexandria Real Estate |
Illumina B4 Shell
San Diego, CA
Project Value: $20,067,000
Project Size: 127,373 SF
Qualcomm BLDG AX
San Diego, CA
Project Value: $4,482,457
Project Size: 50,000 SF
Project Executive Anaptys
Bio Lab TI
San Diego, CA
Project Value: Non-Disclosed
Project Size: 45,000 SF
BMR | Isis Pharmaceuticals
Carlsbad, CA
Project Value: $49,100,000
Project Size: 175,000 SF
Abbott Vascular Temecula
Temecula, CA
Project Value: $94,626,000
Project Size: 165,000 SF
.17
Project Executive on
Space Craft Carlsbad
2051 Palomar Airport Rd
Repositioning Project
208,904 SF Project for Steelwave
Project Executive TriLink
Lab TI
San Diego, CA
Project Value: Non-Disclosed
Project Size: 20,000 SF
Project Executive Argen
Projects
San Diego, CA
Project Value: Non-Disclosed
Project Size: 40,000 SF
Matthew Horak
Matthew Horak was born in South Africa. He attended Point Loma Nazarene University and acquired a degree in Computer Science. After graduation he began his career in construction and joined RQ Construction then moved to DPR Construction after several years. Matthew has been on numerous high profile projects in San Diego and has a special focus for driving process improvement and efficiencies. He joined C2 in 2021 and has been instrumental in project leadership and process improvement.

B.S., Computer Science, Point Loma
Nazarene University
SR. PROJECT MANAGER | 14 YEARS INDUSTRY EDUCATION

RELEVANT EXPERIENCE
PROJECT STAFFING C2 BUILDING GROUP
Alexandria Real Estate |
Celgene Core/Shell & TI
San Diego, CA
Project Value: $24,867,000
Project Size: 60,373 SF
COBHAM (CAES) Buildings
1-7 - Lab & Manufacturing
San Diego, CA
Project Value: $28,000,000
Project Size: 100,000 SF
USD School of Nursing
San Diego, CA
Project Value: $17M
Project Size: 45,000 SF
Alexandria Real Estate |
Campus Point TI for Lily
San Diego, CA
Project Value: $100,100,000
Project Size: 350,000 SF
Shire Regenerative
Medicine, Inc. FKA
Advanced BioHealing
San Diego, CA
Project Value: $94,000,000
Ground-up Biotech
.18
Pacira - Phased Building
San Diego, Ca
$15M
50,000 SF
Abbott Laboratories TI
San Diego, CA
Project Value: Non-Disclosed
Project Size: 12,000 SF
Ansun TI - Lab TI
San Diego, CA
Project Value: $6M
Project Size: 20,000 SF
Nick Gowen
Nick is a passionate project manager that brings a technical skill level and commitment that adds value to the projects he works on. He is driven to do great things for C2 Building Group and their clients. He is a great leader and works well with teams of people. He has extensive experience in projects of this type and size and consistently exceeds the expectations of the project team.

PROJECT MANAGER 10 YEARS INDUSTRY

RELEVANT EXPERIENCE
PROJECT STAFFING C2 BUILDING GROUP
.19
Oregon State University
B.S. in Construction Engineering
Management

EDUCATION
2012—2016
Project Engineer, Fortis
Nike, Oregan State, Kaiser projects
• Project Engineer
• Managed field correspondence, RFIs, submittals, procurement for multiple large projects
• Project Budget Control for $55M project
2016—Present
C2 Building Group Project Executive
Torrey Reserve PX, Longfellow 14 building portfolio project reposition, Fitness Center, 2051 PAR $8M Reposition, Alexandria Real Estate Lab projects (Fate Therapeutics), One Del Mar, Argen Manufacturing, SOVA Lab TIs Karla Bokhoven
Karla brings nearly two decades experience to the team and provides very detailed and thoughtful estimates. She is a meticulous and organized person and brings her knowledge and skills forward in a humble and considerate way. She is deeply committed to the project success and delivers the highest quality work every time. Karla has strong connections with the subcontractor community and consistently exceeds expetations.

ESTIMATOR

RELEVANT EXPERIENCE
PROJECT STAFFING C2 BUILDING GROUP
.20
2007—2013
Project Manager, DPR
Construction
• Preconstruction buyout and procurement
- MEP Coordination
- Project Manager for multiple large scale projects
(Healthcare and Life Science Ground-up projects)
2019-Present
C2 Building Group Estimator
Longfellow SOVA Spec Suite Estimator
- 11545, 11750, 11772, 11585, etc.

Abbott Mesa Rim
- Lab and GMP Space for Abbott Labs - $2.5M
DermTech Lab TI
- Estimator for Lab & Office TI - $17.0M
Warner Bros Office TI
- Estimator for Office TI - $1.5M
2004—2007
Project Engineer, Reno
Contracting
• Procurement, constructability review, design/field
liaison.
- Cost control and review with owners.
- Ground up construction project support
Iowa State Universitdy
B.S. in Civil Engineering
Eli Anderson
Eli brings his experience as a lead foreman for Bergelectric to the C2 team and has been very successful leading complex and technical projects. He is driven to always exceed expectations and has a drive to deliver on each challenge. He is especially skilled at working with craft to drive quality, efficiency, and schedule.

SUPERINTENDENT | 10 YEARS EXPERIENCE

RELEVANT EXPERIENCE
PROJECT STAFFING C2 BUILDING GROUP
.21
2012—2017
Lead Foreman, Bergelectric
Licensed Electrical Journeyman & Inside Wireman
• Foreman on several OSHPD projects for Bergelectric
2017—Present
C2 Building Group Superintendent
Ferring Pharmaceuticals $10.0M TI, 11545 LF Lab TIs at SOVA, IDS Real Estate TI, State St Commons Ground Up Repositioning, Fairbanks Ranch Country Club, Crown Bioscience Vivarium
Greg Van Pelt
Greg brings over two decades of experience in the construction industry.

He recently finished the Warner Brothers TI in Carlsbad with LPA and the DermTech Lab and Office TI that is over 90,000 SF. Greg is a meticulous planner and has the highest expectations for quality. He brings to the project team his background of performing hands on work which equips him for holding the subcontractors accountable on schedule and quality. Greg is a team player and a great fit for supervising this important, technical project.

SUPERINTENDENT | 20 YEARS INDUSTRY

RELEVANT EXPERIENCE
PROJECT STAFFING C2 BUILDING GROUP
Superintendent

TORREY RESERVE CONVERSION
$38.0 MILLION
120,000 SF

DERMTECH LAB & OFFICE TI
$17.0M - 90,255 SF
WARNER BROS GAMES CARLSBAD OFFICE - 16K SF
COMPLETED SPRING 2021
Redevelopment Project - $8.6M
2051 Palomar Airport Rd
$8.3M Project
Superintendent
Supervised the development and
construction of a 22 home new
neighborhood.

Superintendent
Warner Brothers and Pacific
Sotheby’s TI
18,000 SF Office TI in newly
construction shell by C2
.22
Jay Miller
Jay is an uplifting and positive person. He is a great builder and has the technical knowledge to manage complex projects. He understands how to support a project to maintain consistent flow in the field. He is a hands on team player and is driven to exceed the expectations and demands of the project team.

ASSISTANT PROJECT MANAGER

RELEVANT EXPERIENCE
PROJECT STAFFING C2 BUILDING GROUP
.23
2015—2020
Superintendent,
davisREED Inc.
• Project List
- Godfrey Hotel Hollywood
- Contract Value: $60 Million
- Owner: Godfrey Hotel
- Size: 220-unit luxury hotel
Present
C2 Building Group Project
Manager
Torrey Reserve Conversion
- Contract Value: $38.0 Million
- Owner: Longfellow
- Size: 120,255 SF
Mesa Rim Life Science Conversion Project
- Contract Value: $4.0 Million
- Owner: Create Capital
- Size: 19,532 SF
DermTech TI
- Contract Value: $17.0 Million
2007-2015
Project Manager, Adam
Corolla Construction
• Lead over 10 employees from design through completion • Acted as owner/builder agent for inspection and
permitting processes
• Managed subcontractors and field crews
Pacific Coast University
School of Law, JD
University of Saint Francis, BA
Licensed General Contractor
#1006548
OSHA 30 Certified

CERTIFICATIONSEDUCATION
C2 Gross
Revenue
0 10,000,000
20,000,000
30,000,000
40,000,000
50,000,000
60,000,000
70,000,000
80,000,000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Company Revenue Growth
Revenue Goal Actual Revenue
2017 Goal: 12M
2017 Actual: 10.5M
2019 Goal: 25M
2019 Actual: 18M
2020 Goal: 30M
2020 Actual: 29.5M
2021 Goal: 45M
2021 Actual: 33M
2022 Goal: 45M
2022 To Date: 62M
2023 Goal $60M
2024 Goal $68M
2025 Goal $75M
2015 Goal: 3.5M
2015 Actual:3.6M
2016 Goal: 13M
2016 Actual: 7.7M
2018 Goal: 18M
2018 Actual: 21.4M
.24
.25
.26
REFERENCES C2 BUILDING GROUP
References &
Testimonials
Andy Darragh Mobile: (619) 850-0767
[email protected] ARCHITECT, FPBA
Tiffany English Mobile: (510) 816-0921

DIRECTOR OF ARCHITECTURE, QUALCOMM
Laura Andrews Mobile: (619) 929-3958
[email protected], LPA
Mike Barbera Mobile: (858) 361-2781
[email protected], INTERSECT MANAGEMENT Brian Brady Mobile: (858) 243-3652
[email protected], BIOSCIENCE PROPERTIES, INC. “C2 is motivated, easy to work with, accessible,
direct and honest. They bend over backwards with
management of cost, budget and time. This is added
value.”
“They bring new perspective, push the envelope,
embrace the design and support the approach.”
“Absolutely loved working with Jeff and Josh. They
were very detail-oriented and thought things through.

Very creative and intuitive with their solutions to
problems, and always professional and organized.”
— DIRECTOR OF FACILITIES, ABBOTT
“Organized; professional;
great problem-solving.”
— ARCHITECT, ANDAZ TI
— ARCHITECT, THE YARD PROJECT
“As a major nonprofit, we provide a variety of programs for the public in our offices. C2 Building Group understood our mission, and planned their work around our schedule. With C2 Building Group, we were able to continue delivering services throughout a major renovation.”
— PRESIDENT, ALZHEIMER’S ASSOCIATION TI
— ARCHITECT, KASHI TI
.28
INSURANCE C2 BUILDING GROUP
Insurance

ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD

PRODUCER CONTACT
NAME:

FAXPHONE
(A/C, No):(A/C, No, Ext):

E-MAIL
ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY)

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $
DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $

PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT
OTHER: $

COMBINED SINGLE LIMIT
$(Ea accident)
ANY AUTO BODILY INJURY (Per person) $

OWNED SCHEDULED
BODILY INJURY (Per accident) $AUTOS ONLY AUTOS

HIRED NON-OWNED PROPERTY DAMAGE
$AUTOS ONLY AUTOS ONLY (Per accident)
$

OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $

PER OTH-

STATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A
(Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
© 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03)

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
12/1/2022
(619) 346-9553 (619) 324-7035
C2 Building Group
107 South Cedros Ave., Suite 220
Solana Beach, CA 92075
A 2,000,000
CO-4P640551-22-26-G 1/1/2022 1/1/2023 300,000
Owner’s & Contractor 5,000
2,000,000
4,000,000
4,000,000

X ALL OCIP WORK EXCLUDED
2,000,000A
BA-4P656038-22-26-G 1/1/2022 1/1/2023
10,000,000B
CUP-4P659471-22-26-G 1/1/2022 1/1/2023 10,000,000
10,000
B
UB-2S741662-22-26-G 6/18/2022 6/18/2023 1,000,000
1,000,000
1,000,000
C Pollution Liability G71469256 004 1/1/2022 Per Occurrence 5,000,000 D Professional Liab ZCO-71N47715 2/5/2022 1/1/2023 Per Occurrence 3,000,000 $5,000,000 Occurrence/$10,000,000 Aggregate limits included in Pollution Liability policy. $3,000,000 Occurrence/$3,000,000 Aggregate limits included in Professional Liability policy.

Secondary $10,000,000 Occurrence/$10,000,000 Aggregate Umbrella included under Policy #FFX 7034790400 through Continental Casualty Insurance effective 11/18/2022-01/01/2023.

Evidence of Coverage.

Evidence of Coverage
C2BUILD-01 BRITTANY
Culture Insurance Services, LLC
140 West 3rd Avenue
Escondido, CA 92025 [email protected]
Travelers Indemnity Company of Connecticut
Travelers Property Casualty Company of America
Westchester Surplus Lines Insurance Company
St. Paul Surplus Lines Insurance Company
X
1/1/2023
X
X
X
X
X
XX
X
X
X

JOSH CHESNUT JEFF COLE
Conclusion
We promise to deliver this project successfully for your team and look at every commitment as a promise and not
a prediction. We enjoy simplifying the difficult process of construction by taking ownership of the entire journey and delivering efficient solutions. It is fulfilling to work together with a team of people to accomplish a common
goal and experience the tangible results of hard work.

We truly believe that C2 Building Group will exceed your expectations and we look forward to the opportunity to
work together. Thank you for your consideration.

Gratefully,
CONCLUSION C2 BUILDING GROUP
.29
C2SD.COM
858.232.0213
[email protected]
107 S. Cedros Ave #220
Solana Beach, Ca 92075
Contractor License #996486