We Exist to Build Great Things.
Qualifications
November 30, 2022
DPR Construction
®
DPR Overview
Core Market Project
Experience
What Sets Us Apart
1 2
3 Click section
headers
T able of Contents
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
1. DPR Overviewre below the section name.
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
FIRM HISTORY
DPR Construction is a 32-year-old national commercial building contractor and construction management firm with a passion for delivering great results on technical projects. Consistently ranked as one of the top general contractors in the country by Engineering News Record, DPR executes projects with relentless accountability—seeking customer feedback at the beginning, middle and end of each project to ensure that goals stay aligned and expectations are met.
Founded in 1990 by Doug Woods, Peter Nosler, and Ron Davidowski, three veterans of the construction industry, the company cultivates an entrepreneurial, open-office environment based on a well-defined purpose, “We Exist to Build Great Things,” and four core values, “integrity, enjoyment, uniqueness, ever forward.” A privately held, employee-owned, company, DPR is well positioned to handle a wide variety of jobs in both cost and complexity. Our projects range from $5,000 to over $1B.
DPR Construction is a unique technical builder with a passion for results. Ranked in the top 50 general contractors in the country since 1997, we are a national commercial contractor and construction manager that has grown with our customers by delivering measurably more value.
$11B
DPR was awarded more than
$11 billion worth of projects in
2021.
11th
DPR ranked No. 11
on ENR magazine’s top
contractors list for 2022.
90%
Average percentage of annual
revenue from repeat customers
over the last five years.
28 Offices around the United States
32 Years working
around the globe
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
CONSTRUCTION EXPERTISE
Critical Success Factors: If you aren’t keeping score,
it’s just practice. At DPR, we have identified six (6) keys to project success which we track and monitor on each project.
These factors are: Preconstruction, Safety, Quality, Change Management, Project Closeout, and Scheduling make us
uniquely qualified for your project.
PRECONSTRUCTION
EXCELLENCE GOAL:
The first baseline estimate
is a reliable forecast of the GMP .
SAFETY GOAL:
Zero incidents.
SCHEDULING GOAL:
The date given for substantial
completion at mobilization will
be met.
CHANGE MANAGEMENT GOAL:
Rough order magnitude to resolution
is less than 30 days.
ZERO DEFECTS GOAL:
Zero punchlist items at
substantial completion.
PROJECT CLOSEOUT GOAL:
Receive final payment within 60
days of substantial completion.
CRITICAL SUCCESS FACTORS
No. 5
DPR ranked No. 5 on Engineering News-Record magazine’s
list of top construction management-at-risk firms. (2021) 10,000+
DPR has completed more than 10,000 projects—large and
small—since 1990.
DPR OVERVIEW
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
GUIDING PHILOSOPHY
Why do we exist? Our guiding purpose is to build great things – great buildings, great relationships, a great company and a great reputation. To accomplish this, we rely on the contribution of the whole rather than the orders of a few. Our employee-manager relationship is designed to transcend titles and individual authority, and we all share the company’s core values - the foundation of DPR. The core values are fundamental beliefs that are displayed on the walls of every DPR jobsite trailer and throughout all DPR offices: Integrity, Enjoyment, Uniqueness, Ever Forward.
DPR OVERVIEW
ever forward integrity enjoyment uniqueness
CORE MARKETS
FOCUSED MARKETS. FOCUSED RESULTS. Completing a project that meets the quality standards of you and your end users on time and within budget is the baseline. Streamlining the process to increase efficiency and eliminate waste, while offering greater predictability, is how we define and deliver value. When you work with DPR, you can rest assured that our experienced, bullet-smart builders will do their very best. We promise nothing less.
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
3,642
Craft Employees
4,781
Full-Time Staff
30 Office Locations Globally
EVER FORWARD
We attribute our growth and success to the fact that DPR lives up to its commitments — not only those we make to our customers, but those we have made to ourselves. This is just the beginning.
We will continue on our efforts to raise the bar in construction, change the market, and drive innovation. We will continue to recruit to add to our team of talented and hardworking professionals and crafts people, who truly have made DPR the company it is today.
We will continue to implement new innovative systems to provide an even higher quality of service such as new emerging technologies, BIM, Lean and sustainable healthcare. And, we look forward to building upon the foundation that has been laid over the last twenty years in our quest for continual self-initiated change, improvement, learning, and the advancement of standards for their own sake.
DPR OVERVIEW
BALTIMORE
WASHINGTON, D.C.
RICHMOND
RALEIGH-DURHAM
ORLANDO
TAMPA
SOUTH FLORIDA
HOUSTON
DALLAS
AUSTIN
DENVER
SACRAMENTO
SAN FRANCISCO
REDWOOD CITY
SAN JOSE
PASADENA
NEWPORT BEACH
SAN DIEGO PHOENIX
BOSTON
NEW JERSEY
CHARLOTTE
ATLANTA
NASHVILLE
GREENVILLE
SAVANNAH
SEATTLE
TUCSON
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
2. Core Market Project Experience
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
San Diego, CA
Confidential Client
9880 Grad Labs
Customer
Confidential Client
Architect
Dowler-Gruman Architects
Project Value
$55,000,000
Project Dates
March 2018 - October 2019
Square Footage
127,000 SF
PROJECT DESCRIPTION
Ground-up, five-story, 127,000 sq. ft. building with a basement. The building features different sized spaces for offices and research labs.
ARCHITECTURAL CONCRETE CAST-IN-PLACE WINNING STRATEGIES
1. DPR coordinated all the electrical and low voltage in the decks so there were no exposed conduits. Our team was able to work with our subcontractors to 3D model all of that scope. Our strategy included heavy coordination with the architect and engineering teams to make sure the design of the systems were complete.
2. With the architectural concrete (Type 1L, nearly white) we had to pay extremely close attention to the supplying of concrete for the pours. We had a DPR repre- sentative at the plant and someone at the jobsite timing each of the trucks to make sure they were leaving on time to eliminate pour lines. We also made sure that the concrete was coming from the same batch to maintain a consistent color.
3. Consistent with #2 we evaluated how quickly we could pour and utilized an addi- tional pump for pours to pour faster and eliminate pour lines.
4. DPR utilized a 3rd party consultant to evaluate our concrete mix designs and work with our team and the concrete supplier to provide an optimum mix design that would perform well on pour day and finish well.
5. Since the floors were polished concrete, DPR coordinated the location of column kickers to fall within interior wall lines so you wouldn’t see the hole patches.
2022 Qualifications | DPR Construction | dpr.com
BACK TO TOC
San Diego, CA
Confidential Client
Pacific Center Campus Buildings AY and AZ
Customer
Confidential Client
Architect
BNIM
Project Value
$158,233,748
Project Dates
October 2012 - June 2015
Square Footage
420,000 SF
PROJECT DESCRIPTION
The Pacific Center Campus expansion entails two ground up buildings, a central plant expansion, a 475,000-sq.-ft., 1,570-stall parking structure, and site work. Building AY is a ground up five-story, 370,000-sq.-ft. building containing office and lab space with collaboration and social zones. Building AZ is a ground up two-story 53,000-sq.-ft. amenities building that features a 20,000-sq.-ft. vegetated roof with edible gardens, a 299-seat auditorium for large meetings and presentations, a cafeteria with an inside/ outside dining area, a fitness center and athletic field, and a health center. DPR received the “Commercial Structure” award by the American Concrete Institute in 2017 for our work on Building AZ, as well as ENR Best Project Award for the Office/Retail/Mixed Use Category in 2016. Both buildings achieved LEED-NC Gold certification.
ARCHITECTURAL CONCRETE CAST-IN-PLACE WINNING STRATEGIES This project involved ground-up construction in an operational campus, concrete and steel frame construction, and project complexity requiring multiple functions and phases. DPR prepared site logistics plans and a narrated video for planned campus construction that the client played in other campus buildings. DPR updated site logistics plans as construction continued and held town hall meetings and internal client meetings with DPR personnel communicating what was going on. DPR provided appropriate signage, fencing, and lockout/tagout protocols for planned shutdowns. As-cast architectural concrete structure, highly exposed, and most of the TI infrastructure wanted to be organized & embedded in the structure. Everything needed to line up with concrete formwork joints (mullions, lights, exit signs, etc, etc) and wanted to be embedded in concrete (e.g. electrical feeders) to create a simple, clean look. Detailed contractor input during design phase, including development of LOD400 BIM model, transfer of data from model to GPS field stations to layout & located embedded infrastructure in formwork prior to concrete placement.
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
San Francisco, CA
University of California, San Francisco
Medical Center at Mission Bay
Customer
University of California, San Francisco
Architect
Stantec
Project Value
$760,000,000
Project Dates
July 2010 - June 2014
Square Footage
878,000 SF
PROJECT DESCRIPTION
The $759M 878,000-sq.-ft. UCSF Medical Center at Mission Bay is an OSHPD, ground-up, integrated hospital complex that includes: The 183-bed UCSF Benioff Chil- dren’s Hospital at Mission Bay with an urgent care/emergency department, pediatric primary care, and specialty outpatient care; The UCSF Women’s Specialty Hospital with 36 beds, cancer care, specialty surgery, and birth center; UCSF Cancer Hospital at Mission Bay, Part of the Helen Diller Family Comprehensive Cancer Center which houses 70 beds and offers inpatient and outpatient surgery for cancer specialties; a 207,400-sq.-ft. outpatient center includes the NIH-funded Pediatric Clinic Research Center (PCRC), pathology, clinical labs, and a spec lab. The outpatient center also houses cancer treatment services, exam rooms, a dental suite, dialysis, and infusion areas. The 36,000-sq.-ft. central utility plant (known as the Energy center) provides 9MW of backup power for the entire facility from generators served by 80,000 gallons of diesel in underground storage tanks, 3,500 tons of chiller capacity, five 12MBH heating hot water boilers, two 18,000lbs/hr steam boilers, as well as the central control systems for the entire complex. Additional project scopes includes helipad, 1,049 parking spaces, and support services.
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
Customer
University of California, Davis
Architect
HKS, Inc.
Project Value
$36,666,000
Project Dates
July 2017 - April 2019
Square Footage
101,000 SF
University of California, Davis
PROJECT DESCRIPTION
DPR partnered with HKS Architects on this design-build, 101,000-sq.-ft., 4-story, 370-bed new student housing building. Located near the north campus entrance, the building is prominently situated but is also in a dense setting with little-to-no lay-down area. The project includes complete demolition of the existing Webster structure, and construction of a ground-up building in its place.
The new Webster Hall includes 370 beds in single and double rooms, including bath- rooms, common rooms, residence assistant apartments, lounges, recreation rooms, administrative offices, community space, community kitchen, music room, mainte- nance shop and laundry facilities. The project also includes abatement and demolition of existing wood framed student housing buildings. The project is targeting LEED Gold Certification.
The project utilized Digital Building Components to prefabricate the light gauge struc- tural wall and floor panels offsite. This system was proposed to UC Davis by DPR in lieu of traditional wood construction, which converted the building type from Type V to Type II. This improves the occupant safety and durability of the building.
Webster Hall Replacement
Davis, CA
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
Customer
California State University, Chico
Architect
SmithGroupJJR
Project Value
$61,849,000
Project Dates
May 2018 - April 2020
Square Footage
110,209 SF
CSU Chico
PROJECT DESCRIPTION
This CSU collaborative design-build project consists of the design and construction of a new multi-story science building near the center of campus. This building will replace the functions currently housed in the existing Physical Science Building.
The new building will house the departments of chemistry, physics, GEOS, and science education, including spaces for science teaching labs, prep rooms and storage areas.
A neuroscience program with both teaching and research lab space will also be included. In addition, there will be faculty offices, collaborative spaces, classrooms, and other support spaces.
The project will seek LEED Silver certification.
Science Replacement Building
Chico, CA
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
Customer
Arizona Board of Regents
Architect
CO Architects
Project Value
$106,800,000
Project Dates
January 2015 - January 2017
Square Footage
245,000 SF
University of Arizona
PROJECT DESCRIPTION
The distinctive, copper-clad Biomedical Sciences Partnership Building (BSPB) is the second phase of a nine-building academic medical and research complex on the biomedical campus in downtown Phoenix. BSPB brings the latest in technology and lab space to establish Phoenix’s foothold in the biomedical research community.
This 10-story high-rise research laboratory enables collaborative clinical and translational research organized into Centers of Excellence for cancer biology, neuroscience, traumatic brain injury, bioengineering and public health informatics.
Centralized core facilities include an imaging suite and vivarium, a CLIA-certified human tissue analysis core and Class 1000 clean room. The BSPB connects to the adjacent Health Sciences Education Building (HSEB) which the team completed in 2012.
Beginning without a program, BSPB was designed and constructed in a total of 30 months. This is the fastest the University has designed and constructed a project of this scale and complexity by nearly two years. It took a relentless 24/7 operation to complete this 10-story architectural masterpiece.The design and construction team worked hand-in-hand throughout the entire project to concurrently design, release and construct to maintain the schedule. The BSPB was awarded 2017 Best of the Best Higher Education Project in the nation by Engineering News-Record.
Biomedical Sciences Partnership Building
Phoenix, AZ
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
Special Services Group
Self-Perform Work
Sustainability
Preconstruction
Safety
Construction Technology
3. What Sets Us Aparte below the section name.
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
SSG brings the unlimited resources, services and benefits of working with a large national contractor, including
in-house MEP expertise, self-perform work crews, building information modeling experience, sustainability leadership and financial strength. DPR expertly matches individual talent with your specific project requirements to quickly and competently deliver premium results and greater
value. And we do it with a collaborative attitude, knowing that it’s often the little things that make a big difference.
DPR’s Special Services Group (SSG), a business
unit focused on interiors projects. Our dedicated SSG
resources are passionate about this type of work and are uniquely qualified to build this project for you. Some of the benefits of working with our Special Services Group include:
• Low overhead cost
• Intimate, personalized service
• Expertise working in operational facilities
• National resources
• Innovative solutions
• Experience working with tight budgets and
aggressive schedules
Smarter, Faster, Better: Simply put, we are never
satisfied with how good we’ve been, but are driven by
how great we can be for the benefit of our customers.
We provide creative solutions to improve the quality and speed of project delivery while minimizing the impact of construction in occupied buildings and the community.
Customer Satisfaction: DPR executes projects with
relentless accountability - seeking customer feedback at the beginning, middle, and end of each project to ensure that goals stay aligned and expectations are met. We
want to know how we are doing - where we can improve
to make your job easier and more fun.
Small Projects, Big Results
Special Services
Group
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
Being equipped to perform fundamental scopes of
work, such as foundations, drywall and carpentry,
offers customers more control, as well as sets the
tone and pace of the project. DPR crews also serve
as good examples for subcontractors and provide a
clear picture of quality expectations and
safety performance.
DPR SELF-PERFORM ADVANTAGE
Taking care of customers is our priority. DPR delivers
greater value through self-perform work. Schedules
are enhanced as work can start earlier in the field
rather than waiting for biddable documents. Budgets
can be improved with better crew productivity and
contractual arrangements, such as cost of work basis
and return savings to owners. Quality is superior with
a higher level of craftsmanship as DPR is able to
attract, retain and continuously train our craft.
Customers reap the rewards of
DPR’s ability to self perform several
key elements of the project.
EXPERTISE
Each DPR region across the country may self perform some or all of the following trades:
• Concrete, including Foundations, Slabs and Horizontal/Vertical Concrete • Drywall and Taping
• Doors, Frames and Hardware
• Rough Carpentry
• Acoustical Ceiling Work
• Light Demolition and Clean Up
Self-Perform Work
SELF-PERFORM WORK
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
DPR has extensive, every-growing knowledge of increasing building performance, including:
• Advanced Day lighting
• Mixed Mode and Displacement Ventilation
• Building Performance Feedback and User Interface
• High Performance Skin Systems
• Storm and Gray Water Reuse
• Net Zero Energy and Regenerative Strategies
• Material Sourcing for Salvage and Reuse
• Living or Green Roofs
THE SUSTAINABLE ADVANTAGE
To help owners develop and implement the best
sustainable strategies for their business, DPR
Construction combines experience people, a
collaborative methodology and custom tools.
High-performing buildings require high-performing
teams. DPR integrates early-on to guide educated
decision making. Whether the goal for your built
environment is net zero energy, regenerative, living
building or simply to save on your utility bills, DPR’s green professionals are prepared to assist the entire
project team to achieve success within budget.
CUSTOM TOOLS TO ENHANCE THE PROCESS
Understanding and evaluating cost premiums for
sustainable strategies are essential to any green
project. Imagine the advantage of having current
first costs and life cycle data at a very conceptual
phase-even before start of design. Using a custom
application call greenBook, DPR provides detailed
cost data and identifies the “break-even” point
based on estimated design and construction costs
and anticipated operational savings. This helps
teams determine with a higher degree of certainty
which sustainability measures make the most sense
of a specific project’s goals.
OUR NET-ZERO ENERGY BUILDINGS ARE OUR
LIVING LABS
A highly technical builder that specializes in complex
and sustainable projects, DPR is at the forefront
of the next step in sustainability—Net-Zero Energy
(NZE) buildings, which produce as much or more
energy onsite as they consume on an annual basis.
Additionally, we’ve made the commitment that our
own portfolio will be the dynamic and living labs
where we can imple-ment and evaluate innovation
for our customers and highlight the true lessons
we’ve learned through the process of these deep
green projects. We want to inspire and teach in our
spaces and that stays true to our core value of being
an Ever Forward company.In total, DPR has built
five net-zero projects, including four of our regional
offices, with the latest one located in Reston, VA.
This unique experience provides the canvas on
which DPR illustrates not only our commitment as
a leading national green builder but also one that
“walks the walk.”
6 Offices
DPR currently has 6
Net Zero Energy offices
(achieved or targeting)
around the country.
490+
DPR has nearly 500 LEED-
accredited professionals on
staff to help navigate LEED
certifications and provide
advice on sustainability.
299
DPR has 299 projects
that have achieved
or are pursuing LEED
Certification.
SUSTAINABILITY
Sustainability
SUSTAINABILITY
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
• Target Value Design
• Cost Control
• Cost Estimating
• Constructability Reviews
• Last Planner®/ Short-Interval Planning
• Life Cycle Cost Analysis
• Scheduling
• Subcontractor Selection
• Material Procurement
Precision Planning for Project Success
Overall project success relies heavily upon the decisions made at the initial stages of the job. Combining skilled professionals with an open and collaborative approach, DPR’s comprehensive preconstruction services offer advantages on projects of diverse sizes and complexities including:
Providing the assessments and recommendations necessary to make timely, informed and data-driven business decisions.
Better serving the interests of the project through relevant suggestions and hands-on partnership with owners, designers and construction teams.
Helping to manage the overall process by tracking details and holding team members accountable.
Our preconstruction services (listed below) go well beyond traditional open-book cost estimating and value engineering to create more reliable schedules and estimates. We use the most relevant tools, technologies and processes, and get the right people involved at the appropriate time, to drive down project costs while maintaining design intent and the customer’s overall goals and objectives.
Preconstruction
PRECONSTRUCTION
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
SAFETY
Many companies have great safety programs.
DPR has a great safety culture.
We promote and nurture an Injury-Free Environment (IFE), with the goal of achieving zero incidents on every project. Our teams measure and evaluate safety data daily. We use a mobile safety audit system to collect and analyze raw data from each jobsite, which helps teams identify leading indicators, those elements that lead to incidents occurring, and develop meaningful and valuable prevention plans.
DPR’s approach to safety centers on training, instilling and reinforcing safe behaviors throughout the company and entire project team, including owners, architects, and subcontractors. We provide the tools and information people need to make informed decisions through detailed root-cause analysis and pre-task planning. The output is a robust, value-based safety program that looks upstream at leading indicators to produce exceptional downstream results:
• We have some of the best safety statistics in the industry, including our current EMR of 0.41 and NCCI of 0.49.
• 1.21 was DPR’s recordable incident rate in 2019. This makes DPR one of the safest contractors in the nation (industry average is 3.6).
Safety
Safety Recognition & Engagement
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
Innovation
Innovation means we collaborate with owners and project teams to better understand the needs of a project and implement solutions that bring the most value. As an employee-owned company, we take great pride in constantly pushing the boundaries of innovation in the construction industry while delivering quality work to our customers.
We measure innovation by the value it brings to you, our customer. By consistently looking at various technological methodologies at every stage of the construction process from communication, estimating and planning, quality, and construction solutions in the field, we can provide efficiencies to our projects. Our teams are always looking for emerging technologies and innovative construction practices. Below are some of the innovative solutions DPR is currently bringing to our projects.
ESTIMATING AND PLANNING
• Model Based Estimating: Innovaya, DProfiler, WinEst, Model Logics and On-screen take off
• Model Based Scheduling and Production Control: Navisworks, Synchro or Vico Control
• Lean Practices: Last Planner / Pull Planning
• Collaborative Preconstruction: BIM360 Plan
CONSTRUCTION TECHNOLOGIES / FIELD IMPLEMENTATION
VIRTUAL BUILDING
• Self-Performing Detailing
• Laser Scanning
• Virtual Mock-ups
• Total Station Layout: Trimble Total Station
• Augmented Reality: AR Media, BIM Anywhere and SiteSpace 3D
FIELD INNOVATION
• Multi-Trade Prefabrication: Exterior/Interior panels, roof assemblies, and restroom units
• Model Based Spool Sheets
• Quality On-boarding and QC Platforms
• RFID Logistics Management
DIGITAL JOBSITES – SEAMLESS COMMUNICATION
• Electronic Documents - Preconstruction to Closeout
• From File to the Field
• Digital kiosks
• Online Collaborative Submittal Review: Bluebeam Revu • Jobsite Innovation Collaboration: Spigit and Icon
Laser Scanning
Field layout tools, such as Trimble Total Station, allow DPR and subcontractors to layout and verify points from the model directly in the field.
Augmented Reality technology helps with visualization on site.
RFID tags for logistics save time and increase productivity.
BACK TO TOC
2022 Qualifications | DPR Construction | dpr.com
COLLABORATIVE VIRTUAL BUILDING
BUILDING A NEW FRAMEWORK
Providing measurably more value is DPR’s guiding principle in using technology to enhance project delivery. As a long-established leader in Virtual Design and Construction (VDC), we know that technology alone cannot deliver the level of results we have all come to expect. Team members must be able to skillfully use and improve the application of the most relevant technologies to help achieve better value and savings, while creating practical and innovative solutions. Experience has proven that it is a combination of technology and a collaborative ideology, such as integrated project delivery (IPD) or design-build approach, that yields the greatest returns.
VDC – Virtual vs. Actual
No. 6
DPR ranked No. 6 on Building
Design + Construction magazine’s
building information modeling
(BIM) list. (2018)
VDC Consulting
VDC Execution Planning
Model-Based Quantity Take-off
Model-Based Estimating
Self-Perform Work Detailing and Tracking
MEP Coordination
4D Sequencing
BIM-Enabled Constructability Analysis
Laser Scanning
Total Station Integration
Site Logistics Planning
SERVICES
With more than 400 individuals trained in advanced VDC tools on staff across the country, DPR offers a wide range of virtual building services:
We Exist to Build Great Things