Cities Index.
Item 5.7 - Curry Presentation.pdf

Chula Vista City Council
October 17, 2023

Document
Item 5.7 - Curry Presentation.pdf
Meeting
October 17, 2023
Body
Chula Vista City Council
Original file
2.7 MB
Text extracted from the city's file for reading and search. Open the original on pub-chulavista.escribemeetings.com. That file is the official record.

The City of Chula Vista will build new bike lanes on Broadway from C Street on the north end to Main Street on the south end. Broadway currently has no bike lanes; adding them will provide a safer north-south route for bicyclists 54 and scooter riders, encouraging more people to get out of their cars.

C Street
The City also will install a variety of traffic signal upgrades intended to smooth 4th Ave 805 the flow of cars, bicycles and pedestrians along and across Broadway by Broadway responding and adjusting to real-time traffic conditions. The upgrades also will help city traffic engineers better understand and manage traffic patterns.

E Street
THESE UPGRADES INCLUDE:

New advanced transportation • Upgraded traffic signals at the computer controllers at all intersections of Broadway and H Street
signalized intersections. Gand Broadway and F
Broadway 4th Ave
Video detection systems that Fiber-optic cable to support provide accurate counts of advanced traffic signal
J Street
vehicles and bicycles traveling communications
through key intersections • Traffic monitoring cameras
Dedicated short-range that allow traffic engineers to study L Street communications (DSRC) antennas traffic patterns at specific times of day that will enable future vehicle-to- Bluetooth sensors that infrastructure (V2X) communications 805
anonymously measure the time
to support autonomous vehicles Palomar St
it takes to travel between certain
points along the corridor
• Additionally, the City is working with Metropolitan Transit System to build new bus shelters for the Metropolitan Transit System Route 932 Main St bus stops on Broadway.

For more information, visit chulavistaca.gov/smartcity
CHULA VISTA BROADWAY Est Gst

BIKE ROUTE BIKE LANE DANGEROUS

MISSING SIGNS RIGHT LANE TURN RIGHT

BROADWAY TRAFFIC CONGESTION RISK

CARS RACE TO MERGE PASS TRAFFIC LIGHT
Left: Existing conditions on Broadway
Above: Rendering of completed bike lanes

BROADWAY CORRIDOR RIGHT LANE
THRU
CHULA VISTA | IMPROVEMENTS ONLY TRAFFIC
MUST

MAJOR IMPROVEMENTS ARE COMING TO THE BUSIEST NORTH-SOUTH MERGE CORRIDOR IN WESTERN CHULA VISTA OVER THE SUMMER AND FALL OF 2019. LEFT The City of Chula Vista will build new bike lanes on Broadway from TURN RIGHT C Street on the north end to Main Street on the south end. Broadway currently has no bike lanes; adding them will provide a safer north-south route for bicyclists and scooter riders, encouraging more people to get out of their cars.

The City also will install a variety of traffic signal upgrades intended to smooth (Street
the flow of cars, bicycles and pedestrians along and across Broadway by responding and adjusting to real-time traffic conditions. The upgrades also Broadway PREVENT BIKE CAR ROAD ACCIDENTS will help city traffic engineers better understand and manage traffic patterns.

E Street
THESE UPGRADES INCLUDE: MARK RIGHT LANE RIGHT TURN ONLY • New advanced transportation • Upgraded traffic signals at the computer controllers at all intersections of Broadway and POLICE COLLECT ALL ACCIDENT DATA signalized intersections. G and Broadway and F H Street • Video detection systems that • Fiber-optic cable to support 4th Ave provide accurate counts of advanced traffic signal EVEN IF NO INJURIES STUDY HAZARD vehicles and bicycles traveling commilinications J Street through key intersections
• Traffic monitoring cameras
• Dedicated short-range that allow traffic engineers to study L Street https://www.chulavistaca.gov/businesses/smart
communications (DSRC) antennas traffic patterns at specific times of day that will enable future vehicle-to- • Bluetooth sensors that infrastructure (V2X) communications anonymously measure the time -city/projects/broadway-corridor-improvements to support autonomous vehicles it takes to travel between certain Palomar St points along the corridor
• Additionally, the City is working with Metropolitan Transit System to https://www.chulavistaca.gov/home/show build new bus shelters for the Metropolitan Transit System Route 932 Main st bus stops on Broadway.

For more information, visit chulavistaca.gov/smartcitypublisheddocument/19589/637048302679800000 THRU

TRAFFIC
MERGE
LFFT
RIGHT
LANE
MUST
TURN
RIGHT
ZONE
AHEAD

2.5 ONL
Gas Depot 559
186 575
Fogerty Brothers
Trailer Park
Broadway 567
Jiffy Lube Ash Ave
$25 Off Full
Synthetic Oil S17
199
Supreme Gasoline
E St Ash Ave
568
La Quinta Grill E Park Ln
204
Restaurante
Mexican: S$
USA Checks Cashed
& Payday Advance.
625 KO Ash Ave
Himalayan House
Restaurant
E St S.D. Kabob Shack Order Delivery
S10 Off First with Postmates 212
Order Use Give10
S17 216

SD PHONE REPAIR
626 i Wendy's 208
Fast Food•S Broadway
Rose Gold Venue Yum Yum Donuts
220
Donuts •$ E Park Ln ASHAME
H&R Block 200-26
BE
9 Layers Google 226
Banh Mi Paris Express
EZ CAmagery e2023 Airbus, CNES / Airbus, Maxar Technologies, Sanborn, U.S. Geological Survey, Map data @2023 Google A Pisacon Feedback 50ft

Broadway North South Est
RIGHT LANE Broadway North Only Gst
THRU
TRAFFIC MUST OPTION 1 PAINT RIGHT

MERGE TURN ARROW ON ROAD

LEFT TURN RIGHT
OPTION 2 ADD SIGNS

BEST OPTION SAFETY
PREVENT BIKE CAR ROAD ACCIDENTS MOVE BIKE LANE 4TH AVE

MARK RIGHT LANE RIGHT TURN ONLY

BROADWAY TRAFFIC

POLICE COLLECT ALL ACCIDENT DATA CONGESTION CHANGE

EVEN IF NO INJURIES STUDY HAZARD BACK TO FOUR LANES

← All documents from this meeting