Measure P:

Delivering on
the Promise
-DAVID GARCIAS, CHAIR

CITIZENS OVERSIGHT COMMITTEE
Chula Vista voters approved Measure P
– a temporary, ten-year, half-cent sales
tax to fund high priority infrastructure
needs. Collection of the sales tax began
April 1, 2017. As of March 2023, the
sales tax has raised $140.1 million in
revenue which has been reinvested into
our City's future.

The City's Infrastructure, Facilities and
Equipment Expenditure Plan has guided
implementation of Measure P sales tax
funds and has been successfully used
to upgrade police, fire, paramedic and
9-1-1 equipment, vehicles and facilities;
fund streets and sidewalks; replace
storm drains to prevent sinkholes;
improve parks; repair recreation
facilities; and repair and replace other
city infrastructure.

Read more on prominent Measure P-
funded infrastructure projects that have
benefited our community.
"By successfully leveraging and
investing our Measure P revenue to fund
our priority infrastructure needs, the
City has delivered on their promise to
maintain a stronger, safer Chula Vista
and improving the quality of life for our
residents and visitors. "

PUBLIC SAFETY
Major Projects

FUNDED BY REVENUE GENERATED FROM MEASURE P
$30 million in Measure P funding has facilitated major
rehabilitation of Fire Stations throughout the City-
Including the design and construction of new Fire
Stations 3 and 5 and reconstruction of Fire
Station 1, improving emergency services and
response times in the community.

The Loma Verde Community Center is currently undergoing a $22.5 million renovation. When complete, it will have a new multi-purpose gymnasium, dance rooms, crafts room, fitness room, game room, restrooms, two new pools and splash pad, shower/changing rooms, and classrooms. (Summer 2023)

PUBLIC FACILITY RENOVATIONS
Measure P has funded a multitude of much-
needed upgrades and repairs at Chula Vista's largest
park, covering nearly 60 acres, including reconstruction of the basketball courts, bleachers, picnic benches, and drinking fountains; expansion of ADA access; and new restroom facilities (in progress).

Over 300 residential street segments were in failing condition and required major rehabilitation and repairs at costs
significantly more than typical preventative
maintenance. Measure P funding allowed for
major asphalt replacement and rehabilitation
on these streets placing them into a
sustainable cycle of preventative
maintenance for years to come.

CITY INFRASTRUCTURE PROJECTS
21%
37%42%

LOMA VERDE COMMUNITY CENTER
The Chula Vista Civic Center Library opened its doors in 1976, and thanks to Measure P, the City has been able to address significant infrastructure repairs including replacing the roof, restroom renovations for ADA access, and electrical/HVAC upgrades. All with the focus of increasing access to services and materials for the public.

CIVIC CENTER LIBRARY
Funding from Measure P has secured a new
$1.4 million PremierOne Computer Aided
Dispatch (CAD) System, a critical component of
the 911 emergency service framework, ensuring that
the system remains stable and reliable with expanded
technological capabilities directly impacting response
times and officer safety.

POLICE SERVICES

RESIDENTIAL STREET REHABILITATION & REPAIR

ROHR PARK RENOVATION

FIRE FACILITIES & EQUIPMENT
Spent on rehabilitating and
repairing 337 residential street
segments with the lowest
condition scores citywide.
$22.9 MILLION
337
Street Segments
Repaved/Repaired
Public Safety Vehicles
Replaced
Storm Drain Locations
Repaired or Replaced
City Buildings &
Public Facilities
Renovated
175 150 13
Pave, maintain and repair
neighborhood streets and fix
potholes
Improve traffic signal systems
Replace storm drains to
prevent sinkholes
Upgrade or replace aging
police, fire and 911 emergency
response facilities, vehicles
and equipment
Upgrade irrigation systems to
conserve water and save
energy
Make essential repairs to older
libraries, senior center and
recreation centers
Repair sports fields and courts
and park infrastructure
Approved Expenditure
Plan Priorities
0 25 50 75 100
City Infrastructure
Public Safety
Public Facilities
Measure P Expenditures
CURRENT EMCUMBRANCES & PROJECTED ALLOCATIONS FROM FY2017-FY2027 (IN MILLIONS)

SPENT TO DATE OR COMMITTED ESTIMATED UNSPENT
$64.8
$52.4
$33.8
$91.4
$80
$44.2$10.4
$27.6
$26.6

TOTAL PROJECTED ALLOCATIONS
For More Measure P Resources
$91.4 MILLION
$80 MILLION $44.2 MILLION
16K
41 5
9 Energy

ELECTRIC & PLUG-IN

HYBRIDS ADDED TO

CITY FLEET

ENERGY EFFICIENT

HVAC UPGRADES AT

CITY FACILITIES

LOW FLOW RESTROOM

TOILET RENOVATIONS

TO CONSERVE WATER
New!
1 CITYWIDE WATER

EFFICIENT IRRIGATION

SYSTEM INSTALLED

ELECTRIC VEHICLE

CHARGING STATIONS

INSTALLED
Conservation
Projects

LIGHTBULBS

REPLACED WITH LEDS

ACROSS THE CITY
City Infrastructure
ASSETS INCLUDE OVER:
4,200,000 linear feet of curb &
gutters
54,000 public street and park
trees
10,000 streetlights
2,000 acres of open space
1,000 miles of sidewalks, trails,
and paths
570 acres of park land
500 miles of sewer pipes
550 kW of solar photovoltaics
460 miles of public streets
249 miles of storm drains

CITIZENS

OVERSIGHT

COMMITTEE
Per CVMC3.33.160, the
function of the COC is to:

Review and comment on each
year's Finance Department
Report; Measure P Spending
Plan; and Audit Report.

Prepare an Annual Report
regarding the Finance
Department Report for
presentation to the City
Council at a Public Meeting.

Work with City Staff to
identify and apply "best
practices" for tracking &
reporting on Measure P
revenues and expenditures.

CITY INFRASTRUCTURE

UPGRADES
$244.8 Million

TOTAL REVENUE PROJECTED TO BE GENERATED FROM MEASURE P THAT WILL BE REINVESTED BACK INTO THE CITY (CURRENT 10-YEAR PROJECTION THROUGH 2027)
Over $22.9 million has been invested intomaintaining, preserving, and restoring theCity's paved streets. Measure P addressed thestreets in most need of repair through the"Pavement Condition Index" (PCI), repairing all169 identified residential street segments rated"very poor". Over 337 street segments havebeen repaired to date.

STREET REPAIR PUBLIC INFRASTRUCTURE
Replacement of the City network & upgradesto telecommunications has allowed for SmartCity functionality which reduces trafficcongestion and associated carbon emissions,enhances energy savings in City buildings,provides advanced citizen engagementthrough the capabilities of virtual City Hall,and enables enhanced security at City parksand other locations. $25.9 million has been allocated for the repairand maintenance of our City's storm drains,drainage systems, and sidewalks. Over 150drainage pipe locations have been repaired orreplaced, and to date 2,731 sidewalksegments have been serviced and 1,733locations where sidewalk edges were sliced toalleviate trip hazards.

PARKS, FIELDS & COURTS
Measure P funds a multitude of much-neededupgrades and repairs for City-wide parks,fields and sports courts. Projects include theresurfacing of 38 courts, adding energy andwater efficient upgrades, and construction ofADA access at walkways. Over $15.7 millionhas been committed to maintaining andpreserving the community's public parkinfrastructure.

CITY NETWORK UPGRADES

INVESTMENT IN

PUBLIC SAFETY

FIRE SERVICES
Repairs, upgrades, new equipment andvehicles are being funded by Measure P,helping protect life and property of ChulaVista residents, businesses and visitors andensuring Chula Vista remains one of the safestcities in the nation. Including funding thereplacement of the 20-year-old ComputerAided Dispatch (CAD) system.

Funding from Measure P has allowed for themajor rehabilitation of the City's fire stations.Expansion to accommodate new fireapparatus, retrofitting for seismic buildingcode compliance, along with the constructionof new stations to meet service deliverydemands and improve response times to thecommunity.

POLICE SERVICES

REC & SENIOR CENTERS
$16.4 million in Measure P funds haveremediated infrastructure needs at manyother community locations around the City,including the Animal Care Facility, LivingCoast Discovery Center, the Ken Lee Building,and both the Civic Center and South ChulaVista Libraries.

With the high volume use of the City's ninerecreation centers, two aquatic facilities and56 parks, Measure P funding has addressedmany infrastructure needs to keep thesefacilities safe and available to the community.Including new roofs, water and wastewaterplumbing, HVAC, floor resurfacing, andexpanding ADA access.

COMMUNITY FACILITIES

PUBLIC FACILITY

RENOVATIONS