DID YOU WATCH SANDAG VIDEO REPORT?
2024 LOSSAN RAIL ALIGNMENT SANDAG YOUTUBE (1:07:20)
AFTER PRESENTATION MY CALLOUT MOVE TRAIN TRACKS TO I5
NOT JUST DEL MAR BLUFF, INCLUDE NORTH OF SOLANA BEACH
https://www.youtube.com/watch?v=fiPeQeUG3PU&t=4040
YEARS OF DISCUSSION
SAFETY ISSUE LIVES ARE AT RISK
NO MORE USELESS STUDIES TAKE ACTION
MOVE ENTIRE TRACK AWAY FROM BLUFF NOW
IF TRACKS COLLAPSE COMMERCE STOPPED FROM BORDER
$BILLIONS OF FED HIGH SPEED RAIL FUNDS PULLED
USE THE FUNDS TO MOVE THE TRACK TO I5 CORRIDOR
5 SANDAG MEETING 9AM FRIDAY FEB 28
ZOOM https://us02web.zoom.us/j/84297597154
DEL MAR BLUFF COLLAPSE TRAIN TRACK RELOCATE
"The train route is San Diego’s only rail link to Los Angeles and the rest of the United States, but landslides and bluff erosion are making the trek more dangerous. SANDAG is expected to hear public comment on the proposed alignments Feb. 28. SANDAG has been considering several routes for the LOSSAN Rail Realignment Project in Del Mar."
https://www.nbcsandiego.com/news/local/new-routes-for-rail-realignment-project-in-del-mar- proposed-by-sandag/3749828/
SEE PAGE 120 OF REPORT
OPTION 10 AWAY FROM HOMES
ENTIRE TRACK MOVE PARALLEL I-5
LOSSAN Rail Realignment Project Final Value Analysis Study Report Years of studies, decades of failed attempts repair bluffs and yet more useless pilings result increase erosion of bluffs yet the train track still has not been moved away from the ocean! https://www.sandag.org/-/media/SANDAG/Documents/PDF/projects-and-programs/featured- projects/lossan-rail-improvements-del-mar-bluffs/lossan-realignment/sandag-lossan-rail- realignment-final-value-analysis-study-report-2025-02-07.pdf 6 BLUFF COLLAPSE SANDAG REPAIR PILINGS FAILURE