Cities Index.
Attachment 3 - Final Environmental Impact Report_Redacted.Reduced.pdf

Chula Vista City Council
November 18, 2025

Document
Attachment 3 - Final Environmental Impact Report_Redacted.Reduced.pdf
Meeting
November 18, 2025
Body
Chula Vista City Council
Pages
50
Original file
41.4 MB
Text extracted from the city's file for reading and search. Open the original on pub-chulavista.escribemeetings.com. That file is the official record.

Hazards and Hazardous Materials
As described in Section 5.8, Hazards and Hazardous Materials, construction and operation of the project is not anticipated to create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials. In addition, because soil contamination would be remediated to San Deigo RWQCB and San Diego Department of Environmental Health and Quality standards prior to project construction, minor grading and trenching would not encounter contaminated soil that c ould result in a significant hazard to on -site construction personnel or the environment. Further, with compliance with the Construction General Permit and MS4 Permit, project construction would not create a significant hazard to the public or the environm ent through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment. Lastly, the project would not result in potentially hazardous conditions to nearby schools; result in safety hazards or exce ssive noise for people working or residing near an airport; result in interference with an adopted emergency response or evacuation plan; or result in the exposure of people or structures to wildfires. 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-23
Under the Exclusion of Hotel in Planning Area B-2 Alternative, development would occur in Planning Area B -1 and B-2 and potential use or storage of hazardous materials during construction and operation would occur similar to the proposed project. However, with compliance with the Construction General Permit and MS4 Permit, construction of this alternative would not create a significant hazard to the public or the environment through reasonably foreseeable upset or accident conditions involving the release of hazardous materials into the environment, similar to the proposed project . This alternative would occur on the same project site, so the same less -than-significant impacts would result as it relates to soil remediation, proximity to a school, conflicts with an emergency response or evacuation plan, and risk of wildfires. Therefore, impacts would be similar under this alternative compared to the proposed project.

Hydrology and Water Quality
As described in Section 5.9, Hydrology and Water Quality, through implementation of the requirements outlined in the CGP, construction-related impacts to surface water and groundwater would be minimized and impacts would be less than significant. With incorporation of water quality BMPs and project design features, the project would not violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality. The project would not substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin. The proposed storm drain system would be sufficient to satisfy Chula Vista criteria in the post-development condition (Appendix I1) and would not result in erosive scour and associated siltation of San Diego Bay. In addition, the project would not increase the rate of surface runoff; would not exceed the capacity of stormwater drainage systems; would not impede or redirect flood flows; is not located in a flood hazard, tsunami, or seiche zone; and would not interfere with implementation of water quality control plans or sustainable groundwater management plans.

Under the Exclusion of Hotel in Planning Area B-2 Alternative, development would occur in Planning Areas B-1 and B-2, and the existing industrial building would remain in operation in Planning Area A. New stormwater infrastructure would be installed and temporary water diversion and sediment capture devices would be used during construction.

Similar to the proposed project, engineered stormwater infrastructure would be created to ensure runoff is not polluted and ensure runoff would not exceed the capacity of existing infrastructure. The storm drain system under this alternative would be required to satisfy Chula Vista criteria in the post -development condition and would not result in erosive scour and associated siltation of San Diego Bay. Potential impacts to hydrology and water quality would be similar when compared to the proposed project.

Land Use
As described in Section 5.10, Land Use and Planning, the proposed project would not result in a significant environmental impact due to division of an established community, a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. Impacts would be less than significant.

Under the Exclusion of Hotel in Planning Area B -2 Alternative, development in Planning Areas B -1 and B-2 would still occur in compliance with the Specific Plan (Appendix B), although no hotel use would be allowed, or would be constructed. Regardless of the exclusion of the hotel, development would not conflict with a land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. A hotel arguably serves the policies of the Coastal Act better by allowing more p eople to visit the area near the Bay; however, s imilar to the proposed project, land use impacts would be less than significant. 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-24
Noise
As described in Section 5.11, Noise, short-term construction noise is predicted to be well below the FTA guidance of 80 dBA L eq over an 8 -hour period, and therefore is less than significant. Traffic related to construction activities would not result in a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies. Potential impacts at existing off-site noise-sensitive land uses along roadway segments and project- generated changes to future traffic noise would be less than significant. Noise generated by Planning Areas A, B-1, and B-2 are expected to be below the City’s 50 dBA L eq nighttime threshold for multi-family residential land uses.

Note that the multi -family residential land use threshold is applied to this analysis due to an absence of City thresholds for hotel land uses. Therefore, impacts associated with stationary operations noise would be less than significant. Lastly, because the predicted vibration level at 70 feet is less than this guidance limit of 0.2 to 0.3 ips PPV and because there are no residential structures adjacent to the project, the risk of vibration damage to nearby structures is considered less than significant.

Under the Exclusion of Hotel in Planning Area B-2 Alternative, development would still occur in Planning Areas B-1 and B -2, and the existing industrial building would remain in operation in Planning Area A. There would be an increase in noise associated with construction and operation because new land uses would be built and in operation. It is also assumed that predicted vibration level at 70 feet would be less than this guidance limit of 0.2 to 0.3 ips PPV and because there are no residential structures adjacent to the site, the risk of vibration damage to nearby structures under this alternative is considered less than significant. Regardless of the exclusion of the hotel, impacts related to noise would be similar under this alternative when compared to the proposed project.

Population and Housing
As described in Section 5.12, Population and Housing, once operational, the estimated 1,000 jobs that would result from the proposed project would result in some amount of population growth within the City due to new employment opportunities; however, this population growth would not be considered unplanned because the proposed project would restore what was previously a major job center for the City of Chula Vista. No existing residential uses occupy the project site as the site was previously developed with industrial buildings, which have since been demolished.

The proposed project does not include the construction of any residential units and would not displace existing housing or people or necessitate the construction of replacement housing elsewhere.

Similar to the proposed project, no housing would be developed under the Exclusion of Hotel in Planning Area B-2 Alternative and no housing would be displaced. An increase in employment and/or restoration of previous employment opportunities would also be provided under this alternative. Impacts were determined to be less than significant under the proposed project, and impacts would be similar under the Exclusion of Hotel in Planning Area B-2 Alternative.

Public Services
As described in Section 5.13, Public Services, the project would not substantially increase the demand of fire protection services requiring the construction of new or expanded fire protection facilities or facilitate the need for additional firefighters a nd equipment. The City’s PFDIF would help cover the cost of new or expanding public facilities within the City, including fire and police facilities. The proposed project would be subject to payment of the PFDIF fees at the rate in effect at the time build ing permits are issued. Payment of the PFDIF would be necessary to ensure that the project contributes its fair share of the cost of fire police facilities and equipment needed to 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-25
adequately accommodate increasing demand within the City. In addition, the project site is located within existing CFDs for CVESD and SUHSD, which impose a special tax on property owners to finance both school districts. Any development of new school facilities resulting from these CFDs would be undertaken by the school district at that time. Pursuant to Education Code Section 17620(a)(1), the governing board can authorize the levy of a fee, charge, dedication, or other requirements against any construction within school district boundaries, and with the school district’s collection of Statutory and Alternative fees developers can fully mitigate any impacts. Lastly, because the project is considered a commercial development, payment of PFDIF for libraries is not required.

Under the Exclusion of Hotel in Planning Area B-2 Alternative development would still occur in Planning Areas B-1 and B-2 consistent with land use and zoning designations as outlined in the Specific Plan (Appendix B) and the industrial building in Planning Area A would remain in operation. Payment of the City’s PFDIF would still be required under this alternative to help cover the cost of new or expanding public facilities within the City. It is likely the same amount of resources would be required to serve development under this alternative as the proposed project and impacts would be similar.

Recreation
As described in Section 5.14, Recreation, per CVMC Section 17.10.120, the proposed project would not be required to pay park development fees because there are no proposed residences within the project. Therefore, because the proposed project does not include a new residential population and would not increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated. Impacts would be less than significant.

Under the Exclusion of Hotel in Planning Area B-2 Alternative development would still occur in Planning Areas B-1 and B-2 consistent with land use and zoning designations as outlined in the Specific Plan (Appendix B) and the industrial building in Planning Area A would remain in operation. Residential uses are not currently an allowed use under the existing zoning or General Plan land use, so similar to the proposed project, the Exclusion of Hotel in Planning Area B -2 Alternative would not result in new pop ulation or residences , which would require additional recreational space or payment of fees. Therefore, development under this alternative would not be required to pay park development impact fees. Impacts would be similar to the proposed project.

Transportation
As described in Section 5.15, Transportation, the proposed project would not conflict with existing or proposed bicycle, pedestrian, or transit facilities in its vicinity. In addition, the proposed project (A, B1 , and B2) is located in census tract 12600. The SANDAG average VMT per employee is 18.90 and the threshold of 85 percent would be

16.06 VMT per employee or below. The average VMT per employee of this tract is 15.91, which is below the regional average VMT per employee of 18.90 as well as below the VMT per employee threshold (i.e., 85 percent of the reginal mean) of 16.06. Therefore, it can be concluded that the proposed project is in a VMT efficient area for all employee uses. Because the proposed project would meet the VMT screening criteria described above, a more detailed VMT analysis is not required, and can be presumed to result in a less-than-significant VMT impact.

Under the Exclusion of Hotel in Planning Area B-2 Alternative development would still occur in Planning Areas B-1 and B-2 consistent with land use and zoning designations as outlined in the Specific Plan (Appendix B) and the industrial building in Planning Area A would remain in operation. By excluding the hotel, a reduction in approximately 1,400 average daily trips would occur, which would be a substantial reduction in cars to the surrounding roadway network. However, traffic impacts under CEQA are based on VMT and the average VMT per employee of this tract 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-26
is 15.91, which is below the regional average VMT per employee of 18.90 as well as below the VMT per employee threshold (i.e., 85 percent of the reginal mean) of 16.06. Therefore, it can be concluded that similar to the proposed project, this alternative is in a VMT efficient area for all employee uses. B ecause this alternative would meet the VMT screening criteria, a more detailed VMT analysis would not be required, and can be presumed to result in a less-than-significant VMT impact. Thus, when compared to the proposed project, the Exclusion of Hotel in Planning Area B-2 Alternative would result in similar VMT impacts.

As shown in the LMA, the project would be fully responsible for signalizing the Bay Boulevard and G Street and Project Driveway and H Street intersections and retiming the signals at the I -5 Northbound Ramps and E Street, Bay Boulevard and H Street, I-5 Northbound Ramps and H Street, and I-5 Northbound and Southbound Ramps and J Street intersections. The Project would contribute its fair share towards the construction of a traffic signal or roundabout at the Bay Boulevard and F Street. The Project would contribute its fair share towards the construction of a traffic signal at the J Street and L Street intersections with Bay Boulevard. All proposed improvements would achieve LOS D or better conditions during both peak periods except for the roundabout at Bay Boulevard and F Street. The improvements identified in the LMA are recommendations and the final improvement plan and project funding responsibility will be defined and documented in a separate Rohr/Wohl Specific Plan Transportation Conditions of Approval memo.

The Exclusion of Hotel in Planning Area B -2 Alternative would result in a reduction in 1,400 daily trips associated with the hotel, but another, less intensive land use, consistent with the Specific Plan, would be built instead .

Therefore, traffic trips would be reduced when compared to the proposed project. For example, if a 100,000 square- foot warehouse was built instead of a hotel, average daily trips would be reduced by 900 trips (5 trips/ksf for warehouse uses). Therefore, implementation of this alternative would still introduce uses that would generate daily trips, albeit to a lesser degree. With a substantial reduction in trips realized, there would likely be less improvements and fair share payments required. Traffic implications would not be avoided under this alternative, but they would be reduced.

Utilities and Service Systems
As described in Section 5.16, Utilities and Service Systems, the proposed project would have adequate water, wastewater, stormwater, and telecommunication infrastructure. The project would be required to comply with all local and state regulations regardin g solid waste and the surrounding landfills would have capacity to serve the project. Impacts would be less than significant.

Under the Exclusion of Hotel in Planning Area B-2 Alternative development would still occur in Planning Areas B-1 and B-2 consistent with land use and zoning designations as outlined in the Specific Plan (Appendix B) and the industrial building in Planning Area A would remain in operation. Additional water supply would be needed, wastewater would be generated, and solid waste would be disposed of during construction or operation under this alternative. Depending on wh at was developed in place of the hotel u se, it’s anticipated that impacts would be similar regarding utilities and services systems when compared to the proposed project.

10.4.4 Exclusion of All Planning Area B-2 Alternative
Exclusion of Planning Area B-2 entirely would have reduced construction and operational impacts compared to the proposed project in the near -term. However, B -2 would remain vacant, zoned General Industrial, and future development could still occur in Planning Area B-2, albeit would not be required to adhere to the design guidelines outlined in the Specific Plan. This alternative would reduce near-term traffic impacts because average daily trips 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-27
would be reduced by 5,000 trips. There would also be a reduction in near-term construction emissions and noise; however, development would still likely occur in Planning Area B -2 at a later date, consistent with the underlying zoning and land use. Therefore, it’s unlikely that emissions and noise would be reduced in the long-term. Impacts would not be substantially reduced under this alternative when compared to the proposed project.

Aesthetics
As described in Section 5.1, Aesthetics, from both the Marina Parkway/H Street intersection and the northerly segment of Marina Parkway, the project site is not within westerly oriented views toward San Diego Bay, and therefore, implementation of the Speci fic Plan and construction and operation of potential future commercial, industrial, technology, and business park development in Planning Areas A, B -1, and B -2 would not result in blockage or substantial interruption of existing available views to San Diego Bay from Marina Parkway. The project site is not readily visible from a state scenic highway and proposed development would not remove or substantially alter scenic resources, including trees, rock outcroppings, and historic buildings. The project would not conflict with aesthetics-related policies of the General Plan. Because implementation of the Rohr Wohl Specific Plan and future development on the project site would be consistent with identified aesthetics -related policies of the Chula Vista General Plan, potential conflicts with existing regulations governing scenic quality are not anticipated, and impacts would be less than significant. In addition, exterior lighting installed on the project site to support operations would not adversely affect nighttime views in the area, and the project would not result in substantial glare that would adversely affect daytime views in the area.

Under the Exclusion of Planning Area B-2 Alternative, Planning Area B-1 would still be developed with allowed uses as specified in the Specific Plan (Appendix B) and the existing warehouse in Planning Area A would remain in its current condition and in ope ration. As with the proposed project, development in Planning Areas B -1 would complement the surrounding developments currently underway and would active the waterfront with compatible uses on site. Planning Area B-2 would remain a vacant, graded, and future development would not be required to adhere to the design guidelines as outlined in the Specific Plan (Appendix B). Leaving Planning Area B -2 vacant, while all other surrounding parcels in the bayfront are being developed with compatible uses, would likely result in a greater impact to the aesthetics of the area.

Air Quality
As described in Section 5.2, Air Quality, the proposed project fosters a development pattern that promotes orderly growth by developing on a site with previous industrial uses. As such, the project would not contribute to substantial population and employment growth and associated VMT that was not anticipated for the project site in the existing General Plan. Giving the previous uses that existed on the project site, the anticipated growth in employment and population would be within regional growth forecas ts. Implementation of the proposed project would not conflict with or obstruct the implementation of the RAQS and/or applicable portions of the SIP. Daily construction emissions for the project would exceed the SCAQMD’s significance thresholds for VOC, primarily from painting emissions .

Therefore, the project would have a potentially significant impact related to emissions of criteria air pollutant emissions during construction and mitigation is required to reduce the impact. Mitigation Measure AQ-1 (MM AQ-1) would require the use of super compliant VOC paint, which is 10 mg of VOC per liter. The net daily operational emissions for the project would not exceed the SCAQMD’s thresholds for any criteria air pollutant. Therefore, the project would result in a less-than-significant impact related to emissions of criteria air pollutant emissions during operation.

The construction HRA determined that DPM emissions from construction of the project would result in a Maximum Individual Cancer Risk of 20 in 1 million and a Chronic Hazard Index of 0.011. The Chronic Hazard Index would be 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-28
below the 1.0 significance threshold; however, the project would exceed the cancer risk threshold of 10 in a million and would be potentially significant without mitigation (MM-AQ-2 and MM-AQ-4). The operational HRA determined that DPM emissions from opera tion of the project would result in a Maximum Individual Cancer Risk of 205 in 1 million and a Chronic Hazard Index of 0.055. The Chronic Hazard Index would be below the 1.0 significance threshold; however, the project would exceed the cancer risk threshold of 10 in a million and would be potentially significant without mitigation (MM -AQ-4, MM -AQ-5, and MM -AQ-6). All impacts would be reduced to less than significant with mitigation.

Under the Exclusion of Planning Area B -2 Alternative, air pollutant emissions associated with construction, would be reduced, because no development would occur in Planning Area B-2. This alternative would not avoid significant but mitigable emissions related to exposure from construction emissions, because construction air pollutant emissions would still result from the development of Planning Area B -1. Emissions from traffic trips would be reduced when compared to the proposed project due to the reduction in daily trips; however, similar to the proposed project, implementation of this alternative would still introduce uses on Planning Area B -1 that would generate operational air pollutant emissions. In addition, although nothing would be built under this alternative in Planning Area B -2, development would likely occur at some point, consistent with the underlying land use and zoning.

Therefore, compared to the proposed project, the Exclusion of Planning Area B -2 Alternative, would have reduced air quality i mpacts in the near -term and similar air quality impacts in the long -term. Impacts would not be substantially reduced.

Biological Resources
As described in Section 5.3, Biological Resources, The entire project site consists of Tier IV habitats. Tier IV habitats are not considered significant and do not require mitigation. Special -status plant species were not documented within the study area and do not have a moderate or high potential to occur. Two documented special-status wildlife species were found within the study area, American peregrine falcon and osprey. This species has a low potential to nest on site. However, prior to mitigation, imp acts would be potentially significant. MM -BIO-1 would be implemented to reduce impacts to a less -than-significant level. Osprey have a moderate potential for nesting on the site; therefore, impacts would be potentially significant prior to mitigation (MM-BIO-2).

The study area has the potential to support nests that would be protected under the MBTA and/or the California Fish and Game Code Section 3503, under which it is unlawful to “take, possess, or needlessly destroy” avian nests or eggs. Thus, if additional vegetation clearing or grading happens during the breeding season, impacts would be potentially significant and mitigation (MM -BIO-3) would be required. The area is not known to support roosting colonies of special-status bats; therefore, construction is not anticipated to substantially affect either species (pallid bat and western mastiff bat) . Nonetheless, prior to mitigation (MM -BIO-4 and MM -BIO-5) impacts would be potentially significant.

In addition, compliance with regional and local laws, regulations, and policies, would ensure that indirect impacts would be less than significant; the proposed project would result in no impact to riparian habitats or other sensitive natural communities; the project site does not support areas that could be considered jurisdictional by USACE, RWQCB, the California Coastal Commission, or CDFW; the project does not propose any new barriers, such as new development or fencing, that would prevent wildlife move ment; and the proposed project would abide by all local policies and ordinances protecting biological resources in the City of Chula Vista. However, in order to ensure the project’s compliance with the MSCP Subarea Plan, mitigation (MM -BIO-6, MSCP Subarea Plan Consistency and Adjacency) would be required. Prior to mitigation impacts would be potentially significant. 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-29
The Exclusion of Planning Area B -2 Alternative would require some additional ground -disturbing activities in Planning Area B-1, but no additional ground-disturbing activities would occur in Planning Area B-2. This alternative could still result in potential direct and/or indirect impacts to nesting birds. This alternative would still require implementation of mitigation measures, similar to the proposed project. Therefore, as development would still occur under this alternative, compared to the proposed project, this alternative would result in similar impacts to biological resources and mitigation would be required.

Cultural and Tribal Cultural Resources
As described in Section 5.4, Cultural and Tribal Cultural Resources, the potential for intact cultural deposits to exist within native soils to the depths of proposed ground disturbance is unknown. In the event that unanticipated cultural resources are encountered during project implementation, impacts could be p otentially significant, and mitigation measures (MM-CUL-1) would be required. The results of the records search did not identify the presence of any previously recorded archaeological sites within t he project site. However, prior to mitigation impacts would be potentially significant. While the potential to encounter human remains is low, in the event that human remains are uncovered, impacts would also be potentially significant (MM-CUL-1). On May 3, 2024, the City sent notification letters pursuant to AB 52 and SB 18 to tribes who are traditionally and culturally affiliated with the area of the project. To date, one response from the San Pasqual Tribe was received on May 30, 2024. In respons e to the ir request, the City provided the project-specific Cultural Resources Report. The City reached out to the Tribe on July 17, 2024, via e-mail to conduct a formal consultation, and no response has been reciprocated. Consultation with Native American tribes is ongoing. Mitigation would still be required to reduce impacts to less than significant.

Under the Exclusion of Planning Area B -2 Alternative minimal additional ground -disturbing activities would be required and it would be limited to Planning Area B -1. As such, this alternative could still result in potential direct and/or indirect significant impacts to cultural or tribal cultural resources. This alternative would require implementation of MM-CUL-1 as proposed for the project. Therefore, compared to the proposed project, this alternative would result in similar impacts to cultural and tribal cultural resources.

Energy
As described in Section 5.5, Energy, construction and operational consumption of electricity, natural gas, and petroleum would not be considered inefficient, wasteful, or otherwise unnecessary and impacts would be less than significant. In addition, the project would not conflict with or obstruct a state or local plan for renewable energy or energy efficiency.

The Exclusion of Planning Area B -2 Alternative would reduce the amount of energy consumption required during construction because construction would only occur on Planning Area B-1. This Alternative would still consume additional energy during operation because development would occur in Planning Area B-1 and the warehouse on Planning Area A would remain in operation as it currently is. In addition, although nothing would be built under this alternative, development would likely occur at some point, consistent with the underlying land use and zoning. Therefore, compared to the proposed project, the Exclusion of Planning Area B-2 Alternative, would have reduced energy impacts in the near- term and similar energy impacts in the long-term. Impacts would not be substantially reduced.

Geology and Soils
As described in Section 5.6, Geology and Soils, impacts associated with landslides, seismic ground shaking, expansive soils and erosion would be less than significant. However, development of the proposed project would 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-30
require excavations for building foundations and utilities, and any excavations into the potentially fossil -bearing strata within the Bay Point and San Diego Formations could result in potentially significant impacts to paleontological resources, and mitigation measure MM-GEO-1 would be required. Impacts would be reduced to less than significant.

Under the Exclusion of Planning Area B -2 Alternative minimal additional ground -disturbing activities would be required for Planning Area B-1, but no additional ground disturbance would occur in Planning Area B -2. However, paleontological resources would have the potential to be disturbed under this alternative and implementation of MM-GEO-1 would still be required. Therefore, when compared to the proposed project, the Exclusion of Planning Area B-2 Alternative would have similar impacts to the proposed project.

Greenhouse Gas Emissions
As described in Section 5.7, Greenhouse Gas Emissions, the project’s significance is based on its potential to conflict with the applicable plans adopted for the purpose of reducing GHG emissions, including the City’s CAP, the 2022 Scoping Plan, the 2017 S coping Plan, AB 32 Regulations, SANDAG’s RTP/SCS and the City’s General Plan.

As demonstrated in Section 5.7, the project would not conflict with applicable GHG reduction plans and regulations, accordingly, the impact would be less than significant.

Under the Exclusion of Planning Area B -2 Alternative, GHG emissions associated with construction, would be reduced, because no development would occur in Planning Area B -2. GHG emissions related to construction and operation would be reduced, because development would only occur in Planning Area B -1 and Planning Area A would remain in operation. Emissions from traffic trips would be reduced when compared to the proposed project due to the reduction in daily trips associated with Planning Area B -2; however, similar to the proposed project, implementation of this alternative would still introduce uses that would generate operational GHG emissions. In addition, although nothing would be built under this alternative in Planning Area B -2, development would likely occur at some point, consistent with the underlying land use and zoning. Therefore, compared to the proposed project, the Exclusion of Planni ng Area B-2 Alternative, would have reduced greenhouse gas impacts in the near - term and similar greenhouse gas impacts in the long-term. Impacts would not be substantially reduced.

Hazards and Hazardous Materials
As described in Section 5.8, Hazards and Hazardous Materials, construction and operation of the project is not anticipated to create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials. In addition, because soil contamination would be remediated to San Deigo RWQCB and San Diego Department of Environmental Health and Quality standards prior to project construction, minor grading and trenching would not encounter contaminated soil that c ould result in a significant hazard to on -site construction personnel or the environment. Further, with compliance with the Construction General Permit and MS4 Permit, project construction would not create a significant hazard to the public or the environm ent through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment. Lastly, the project would not result in potentially hazardous conditions to nearby schools; result in safety hazards or exce ssive noise for people working or residing near an airport; result in interference with an adopted emergency response or evacuation plan; or result in the exposure of people or structures to wildfires.

Under the Exclusion of Planning Area B-2 Alternative, development would occur in Planning Area B-1 and potential use or storage of hazardous materials during construction and operation would occur similar to the proposed project. However, with compliance w ith the Construction General Permit and MS4 Permit, construction of this 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-31
alternative would not create a significant hazard to the public or the environment through reasonably foreseeable upset or accident conditions involving the release of hazardous materials into the environment, similar to the proposed project. This alternative would occur on the same project site, so the same less-than-significant impacts would result as it relates to soil remediation, proximity to a school, conflicts with an emergency response or evacuation plan, and risk of wildfires. Therefore, impacts would be similar under this alternative compared to the proposed project, regardless of the exclusion of development in Planning Area B-2.

Hydrology and Water Quality
As described in Section 5.9, Hydrology and Water Quality, through implementation of the requirements outlined in the CGP, construction-related impacts to surface water and groundwater would be minimized and impacts would be less than significant. With incorporation of water quality BMPs and project design features, the project would not violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality. The project would not substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin. The proposed storm drain system would be sufficient to satisfy Chula Vista criteria in the post-development condition (Appendix I1) and would not result in erosive scour and associated siltation of San Diego Bay. In addition, the project would not increase the rate of surface runoff; would not exceed the capacity of stormwater drainage systems; would not impede or redirect flood flows; is not located in a flood hazard, tsunami, or seiche zone; and would not interfere with implementation of water quality control plans or sustainable groundwater management plans.

Under the Exclusion of Planning Area B -2 Alternative, development would occur in Planning Areas B -1 and the existing industrial building would remain in operation in Planning Area A. New stormwater infrastructure would be installed and temporary water diversion and sediment capture devices would be used during construction. Similar to the proposed project, engineered stormwater infrastructure would be created to ensure runoff is not polluted and ensure runoff would not exceed the capacity of existing infras tructure. The storm drain system under this alternative would be required to satisfy Chula Vista criteria in the post-development condition and would not result in erosive scour and associated siltation of San Diego Bay. Potential impacts to hydrology and water quality would be similar when compared to the proposed project.

Land Use
As described in Section 5.10, Land Use and Planning, the proposed project would not result in a significant environmental impact due to division of an established community, a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. Impacts would be less than significant.

Under the Exclusion of Planning Area B -2 Alternative, development in Planning Areas B -1 would still occur in compliance with the Specific Plan (Appendix B) ; however, future development in Planning Area B -2 would not be required to adhere to the Specific Plan and would instead be subject to the existing regulations as outlined in the City’s Municipal Code. Although future development in Planning Area B -2 would likely not conflict with a land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect, it may be less cohesive or compatible due to its nonconformance with the Specific Plan. Overall, land use impacts would be less than significant similar to the proposed project.
10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-32
Noise
As described in Section 5.11, Noise, short-term construction noise is predicted to be well below the FTA guidance of 80 dBA L eq over an 8 -hour period, and therefore is less than significant. Traffic related to construction activities would not result in a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies. Potential impacts at existing off-site noise-sensitive land uses along roadway segments and project- generated changes to future traffic noise would be less than significant. Noise generated by Planning Areas A, B-1, and B-2 are expected to be below the City’s 50 dBA L eq nighttime threshold for multi-family residential land uses.

Note that the multi -family residential land use threshold is applied to this analysis due to an absence of City thresholds for hotel land uses. Therefore, impacts associated with stationary operations noise would be less than significant. Lastly, because the predicted vibration level at 70 feet is less than this guidance limit of 0.2 to 0.3 ips PPV and because there are no residential structures adjacent to the project, the risk of vibration damage to nearby structures is considered less than significant.

Under the Exclusion of Planning Area B-2 Alternative, development would still occur in Planning Area B-1, and the existing industrial building would remain in operation in Planning Area A. There would be an increase in noise associated with construction an d operation because new land uses would be built and in operation ; however, excluding development in Planning Area B-2 altogether would result in reduced construction noise and vibration in the near-term. However, although nothing would be built under this alternative in Planning Area B-2, development would likely occur at some point, consistent with the underlying land use and zoning. Therefore, compared to the proposed project, the Exclusion of Planning Area B -2 Alternative, would have reduced noise impac ts in the near - term and similar noise impacts in the long-term. Impacts would not be substantially reduced.

Population and Housing
As described in Section 5.12, Population and Housing, once operational, the estimated 1,000 jobs that would result from the proposed project would result in some amount of population growth within the City due to new employment opportunities; however, this population growth would not be considered unplanned because the proposed project would restore what was previously a major job center for the City of Chula Vista. No existing residential uses occupy the project site as the site was previously developed with industrial buildings, which have since been demolished.

The proposed project does not include the construction of any residential units and would not displace existing housing or people or necessitate the construction of replacement housing elsewhere.

Similar to the proposed project, no housing would be developed under the Exclusion of Planning Area B-2 Alternative and no housing would be displaced. An increase in employment and/or restoration of previous employment opportunities would still be provided under this alternative due to the development in Planning Area B -1 and the continued use of Planning Area A. Impacts were determined to be less than significant under the proposed project, and impacts would be similar under the Exclusion of Planning Area B-2 Alternative.

Public Services
As described in Section 5.13, Public Services, the project would not substantially increase the demand of fire protection services requiring the construction of new or expanded fire protection facilities or facilitate the need for additional firefighters and equipment. The City’s PFDIF would help cover the cost of new or expanding public facilities within the City, including fire and police facilities. The proposed project would be subject to payment of the PFDIF fees at the rate in effect at the time build ing permits are issued. Payment of the PFDIF would be necessary 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-33
to ensure that the project contributes its fair share of the cost of fire police facilities and equipment needed to adequately accommodate increasing demand within the City. In addition, the project site is located within existing CFDs for CVESD and SUHSD, which impose a special tax on property owners to finance both school districts. Any development of new school facilities resulting from these CFDs would be undertaken by the school district at that time. Pursuant to Education Code Section 17620(a)(1), the governing board can authorize the levy of a fee, charge, dedication, or other requirements against any construction within school district boundaries, and with the school district’s collection of Statutory and Alternative fees developers can fully mitigate any impacts. Lastly, because the project is considered a commercial development, payment of PFDIF for libraries is not required.

Under the Exclusion of Planning Area B-2 Alternative development would still occur in Planning Area B-1 consistent with land use and zoning designations as outlined in the Specific Plan (Appendix B) and the industrial building in Planning Area A would remain in operation. Payment of the City’s PFDIF would still be required under this alternative to help cover the cost of new or expanding public facilities within the City. However, a reduced amount of resources would be required to serve development under th is alternative in the near-term when compared to the proposed project. Although nothing would be built under this alternative in Planning Area B-2, development would likely occur at some point, consistent with the underlying land use and zoning. Therefore, compared to the proposed project, the Exclusion of Planning Area B-2 Alternative, would have reduced impacts in the near-term and similar impacts in the long-term. Impacts would not be substantially reduced.

Recreation
As described in Section 5.14, Recreation, per CVMC Section 17.10.120, the proposed project would not be required to pay park development fees because there are no proposed residences within the project. Therefore, because the proposed project does not include a new residential population and would not increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated. Impacts would be less than significant.

Under the Exclusion of Planning Area B-2 Alternative development would still occur in Planning Area B-1 consistent with land use and zoning designations as outlined in the Specific Plan (Appendix B) and the industrial building in Planning Area A would remain in operation. Residential uses are not currently an allowed use under the existing zoning or General Plan land use, so similar to the proposed project, the Exclusion of Planning Area B-2 Alternative would not result in new population or residences, which would require additional recreational space or payment of fees. Therefore, development under this alternative would not be required to pay park development impact fees.

Impacts would be similar to the proposed project.

Transportation
As described in Section 5.15, Transportation, the proposed project would not conflict with existing or proposed bicycle, pedestrian, or transit facilities in its vicinity. In addition, the proposed project (A, B1 , and B2) is located in census tract 12600. The SANDAG average VMT per employee is 18.90 and the threshold of 85 percent would be

16.06 VMT per employee or below. The average VMT per employee of this tract is 15.91, which is below the regional average VMT per employee of 18.90 as well as below the VMT per employee threshold (i.e., 85 percent of the reginal mean) of 16.06. Therefore, it can be concluded that the proposed project is in a VMT efficient area for all employee uses. Because the proposed project would meet the VMT screening criteria described above, a more detailed VMT analysis is not required, and can be presumed to result in a less-than-significant VMT impact. 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-34
Under the Exclusion of Planning Area B-2 Alternative development would occur in Planning Area B-1 consistent with land use and zoning designations as outlined in the Specific Plan (Appendix B) and the industrial building in Planning Area A would remain in operation. By excluding development in Planning Area B -2 entirely, a reduction in approximately 5,000 average daily trips would occur, which would be a substantial reduction in cars to the surrounding roadway network. However, traffic impacts under CEQA ar e based on VMT and the average VMT per employee of this tract is 15.91, which is below the regional average VMT per employee of 18.90 as well as below the VMT per employee threshold (i.e., 85 percent of the reginal mean) of 16.06. Therefore, it can be concluded that similar to the proposed project, this alternative is in a VMT efficient area for all employee uses. B ecause this alternative would meet the VMT screening criteria, a more detailed VMT analysis would not be required, and can be presumed to result in a less -than-significant VMT impact. Thus, when compared to the proposed project, the Exclusion of Planning Area B-2 Alternative would result in the same VMT impacts.

As shown in the LMA, the project would be fully responsible for signalizing the Bay Boulevard and G Street and Project Driveway and H Street intersections and retiming the signals at the I -5 Northbound Ramps and E Street, Bay Boulevard and H Street, I-5 Northbound Ramps and H Street, and I-5 Northbound and Southbound Ramps and J Street intersections. The Project would contribute its fair share towards the construction of a traffic signal or roundabout at the Bay Boulevard and F Street. The Project would contribute its fair share towards the construction of a traffic signal at the J Street and L Street intersections with Bay Boulevard. All proposed improvements would achieve LOS D or better conditions during both peak periods except for the roundabout at Bay Boulevard and F Street. The improvements identified in the LMA are recommendations and the final improvement plan and project funding responsibility will be defined and documented in a separate Rohr/Wohl Specific Plan Transportation Conditions of Approval memo.

As it relates to the reduction in trips as a result of this alternative, it can be assumed that less improvements and fair share payments would be required. However, although nothing would be built under this alternative in Planning Area B -2, development would likely occur at some point, consistent with the underlying land use and zoning.

Therefore, compared to the proposed project, the Exclusion of Planning A rea B-2 Alternative, would have reduced traffic implications in the near-term and similar traffic implications in the long-term.

Utilities and Service Systems
As described in Section 5.16, Utilities and Service Systems, the proposed project would have adequate water, wastewater, stormwater, and telecommunication infrastructure. The project would be required to comply with all local and state regulations regardin g solid waste and the surrounding landfills would have capacity to serve the project. Impacts would be less than significant.

The Exclusion of All Planning Area B-2 Alternative would develop Planning Area B -1 consistent with land use and zoning designations as outlined in the Specific Plan (Appendix B) and the industrial building in Planning Area A would remain in operation. Additional water supply would be needed, wastewater would be generated, and solid waste would be disposed of during construction or operation under this alternative. With no development occurring in Planning Area B-2, the demand on utilities would be reduced compared to the proposed project in the near-term.

However, development in Planning Area B-2 would likely occur at some point, consistent with the underlying land use and zoning. Therefore, compared to the proposed project, the Exclusion of Planning Area B-2 Alternative, would have reduced impacts on utilities in the near-term, but similar operational impacts in the long-term. 10 - ALTERNATIVES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 10-35

10.5 Environmentally Superior Alternative
The No Project (No Build) Alternative is the environmentally superior alternative because it would involve no changes on the project site. The project site would remain in its current condition, effectively eliminating those project impacts discussed in this EIR. In accordance with CEQA, if the environmentally superior alternative is the No Project (No Build) Alternative, the EIR must also identify an environmentally superior alternative among the other alternatives (Section 15126[e][2]). Table 10 -1 provide s a summary comparison of the significant impacts attributable to each of the alternatives relative to the proposed project.

As demonstrated in Table 10 -1, the next environmentally superior alternative would be the Exclusion of Hotel in Planning Area B-2 Alternative. Under this alternative development would still occur in Planning Area B -1 and the existing industrial building in Planning Area A would remain in operation; however, instead of a hotel being built in Planning Area B-2, a less intensive land use would be built instead. Implementation of this alternative would still introduce uses that would generate operational air pollutant emissions and greenhouse gas emissions, but not to the same extent that a hotel would. Compared to the proposed project, the Exclusion of Hotel in Planning Area B-2 Alternative, would have reduced impacts, because a hotel would not be built and a less intensive development, consistent with the Specific Plan, would be built instead. In addition, exclusion of a hotel in Planning Area B-2 would, because of the unique operational characteristics of a hotel, substantially reduce operational impacts associated traffic, and utilities (water supply, wastewater service, and solid waste generation). This alternative would still meet all of the project’s objectives. For these reasons, the Exclusion of Hotel in Planning Area B -2 is considered the environmentally superior alternative.

ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-1
11 References
Chapter 1 Executive Summary
City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan.

City of Chula Vista. 2013. Chula Vista Bayfront Local Coastal Program: Land Use Plan. Certified by the California Coastal Commission in May 2013.

City of Chula Vista. 2018. Chula Vista Bayfront Local Coastal Program Amendment: Bayfront Specific Plan.

Amended October 16, 2018. https://www.chulavistaca.gov/home/showpublisheddocument/ 8423/637817386683530000.

Chapter 2 Introduction
City of Chula Vista. 2003. City of Chula Vista MSCP Subarea Plan. February 2003. https://www.chulavistaca.gov/ departments/development-services/planning/habitat-conservation.

City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan.

City of Chula Vista. 2018. Chula Vista Bayfront Local Coastal Program Amendment: Bayfront Specific Plan.

Amended October 16, 2018. https://www.chulavistaca.gov/home/showpublisheddocument/ 8423/637817386683530000.

Chapter 3 Environmental Setting
City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan.

WRCC (Western Regional Climate Center). 2023. “Chula Vista, California (041758): Period of Record Monthly Climate Summary. Period of Record: 09/01/1918 to 05/31/206.” Accessed June 2023. https://wrcc.dri.edu/cgi-bin/cliMAIN.pl?ca1758.

Chapter 4 Project Description
City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-2
City of Chula Vista. 2013. Chula Vista Bayfront Local Coastal Program: Land Use Plan. Certified by the California Coastal Commission in May 2013.

City of Chula Vista. 2018. Chula Vista Bayfront Local Coastal Program Amendment: Bayfront Specific Plan.

Amended October 16, 2018. https://www.chulavistaca.gov/home/showpublisheddocument/ 8423/637817386683530000.

Chapter 5 Environmental Analysis
Section 5.1 Aesthetics
California Department of Finance. 2023. “Estimates-E1: Population and Housing Estimates for Cities, Counties, and the State — January 1, 2022 and 2023.” May 2023. https://dof.ca.gov/forecasting/ demographics/estimates-e1/.

Caltrans (California Department of Transportation). 2020. Scenic Highways System Lists. Accessed September 2023. https://dot.ca.gov/programs/design/lap-landscape-architecture-and-community-livability/ lap-liv-i-scenic-highways.

City of Chula Vista. 2003a. Chula Vista Greenbelt Master Plan. Adopted September 16, 2003. https://www.chulavistaca.gov/departments/development-services/planning/ chula-vista-greenbelt-master-plan.

City of Chula Vista. 2003b. City of Chula Vista MSCP Subarea Plan. February 2003. https://www.chulavistaca.gov/departments/development-services/planning/habitat-conservation.

City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005. https://www.chulavistaca.gov/departments/development-services/planning/planning-digital-library/ general-plan.

Port of San Diego. 2024. “Projects: Chula Vista Bayfront”. https://www.portofsandiego.org/projects/chula-vista- bayfront. Accessed July 31, 2024.

Section 5.2 Air Quality
CAPCOA (California Air Pollution Control Officers Association). 2022. California Emissions Estimator Model (CalEEMod) User’s Guide, Version 2022.1. Prepared by ICF, in collaboration with Sacramento Metropolitan Air Quality Management District, Fehr & Peers, STI, and Ramboll. April. Available:
https://caleemod.com/documents/user-guide/CalEEMod_User_Guide_v2022.1.pdf.

CARB (California Air Resources Board). 2000. Risk Reduction Plan to Reduce Particulate Matter Emissions from Diesel-Fueled Engines and Vehicles. October 2000. Available: http://www.arb.ca.gov/diesel/documents/ rrpfinal.pdf.

CARB. 2005. Air Quality and Land Use Handbook: A Community Health Perspective. April 2005. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-3
CARB. 2016. “Ambient Air Quality Standards.” May 4, 2016. Available: https://ww2.arb.ca.gov/ sites/default/files/2020-07/aaqs2.pdf.

CARB. 2023a. “iADAM: Air Quality Data Statistics.” Available: http://arb.ca.gov/adam. Accessed March 2023.

CARB. 2023b. “Area Designation Maps/State and National.” Available: http://www.arb.ca.gov/ desig/adm/adm.htm.

CARB. 2023c. “Ozone & Health.” Available: https://ww2.arb.ca.gov/resources/ozone-and-health.

CARB. 2023d. “Nitrogen Dioxide & Health.” Available: https://ww2.arb.ca.gov/resources/nitrogen-dioxide-and-health.

CARB. 2023e. “Carbon Monoxide & Health.” Available: https://ww2.arb.ca.gov/resources/carbon-monoxide-and-health.

CARB. 2023e. “Sulfur Dioxide & Health.” Available: https://ww2.arb.ca.gov/resources/sulfur-dioxide-and-health CARB. 2023f. Inhalable Particulate Matter and Health (PM2.5 and PM10). Available: https://www.arb.ca.gov/ research/aaqs/common-pollutants/pm/pm.htm.

CARB. 2023g. “Overview: Diesel Exhaust and Health.” Available: https://www.arb.ca.gov/research/diesel/ diesel-health.htm.

City of Chula Vista. General Plan 2005. Available: https://www.chulavistaca.gov/departments/development- services/planning/planning-digital-library/general-plan.

City of Chula Vista. 2011. Climate Adaptation Plans. May. Available: https://www.chulavistaca.gov/home/ showpublisheddocument/5443/635591545349170000
City of Chula Vista. 2017. Climate Action Plan. September. Available: https://www.chulavistaca.gov/ departments/clean/conservation/climate-action-plan.

County of San Diego. 2011. San Diego County General Plan Update: Final Environmental Impact Report. EIR No. 02-ZA-001. SCH No. 2002111067. August 2011. Available: https://www.sandiegocounty.gov/ content/sdc/pds/gpupdate/environmental.html.

County of San Diego. 2021. County of San Diego Communicable Disease Registry - Coccidioidomycosis Case Counts and Rates by Zip Code San Diego County Residents 2012-2020. Available:
https://www.sandiegocounty.gov/content/dam/sdc/pds/ceqa/JVR/AdminRecord/IBR/COUNTY%20OF% 20SAN%20DIEGO%202021%20Coccidioidomycosis_ZipCode_SanDiegoCounty_2010_2019.pdf CPUC (California Public Utilities Commission). 2021. “Natural Gas and California.” Available:
http://www.cpuc.ca.gov/natural_gas/
CPUC. 2022. “CPUC Sets Biomethane Targets for Utilities.” February 2022. Available: https://www.cpuc.ca.gov/ news-and-updates/all-news/cpuc-sets-biomethane-targets-for-utilities EPA. 2013. Integrated Science Assessment (ISA) of Ozone and Related Photochemical Oxidants (Final Report, Feb 2013). EPA/600/R-10/076F. February 2013. Accessed May 2019. Available: https://cfpub.epa.gov/ ncea/isa/recordisplay.cfm?deid=247492.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-4
EPA. 2022a. “Criteria Air Pollutants.” August 9, 2022. Accessed March 2023. Available: https://www.epa.gov/ criteria-air-pollutants.

EPA. 2022b. AERMOD Users’ Guide. Available: https://gaftp.epa.gov/Air/aqmg/SCRAM/models/preferred/ aermod/aermod_userguide.pdf.

EPA. 2022c. Basics of Climate Change. February 23. Available: https://www.epa.gov/climatechange-science/ basics-climate-change.

EPA. 2023a. Inventory of U.S. Greenhouse Gas Emissions and Sinks: 1990-2021. U.S. Environmental Protection Agency, EPA 430-R-23-002. https://www.epa.gov/ghgemissions/inventory-us-greenhouse-gas-emissions- and-sinks-1990-2021.

Mizuta Traffic Consulting. 2023. Rohr Wohl Specific Plan Local Mobility Analysis. July 2023.

NRC (National Research Council). 2005. Interim Report of the Committee on Changes in New Source Review Programs for Stationary Sources of Air Pollutants. Washington, DC: The National Academies Press.

Available: https://doi.org/10.17226/11208.

OEHHA (Office of Environmental Health Hazard Assessment). 2015. Air Toxics Hot Spots Program. Risk Assessment Guidelines. Guidance Manual for Preparation of Health Risk Assessments. February 2015.

Available: http://oehha.ca.gov/air/hot_spots/2015/2015GuidanceManual.pdf.

SANDAG (San Diego Association of Governments). 2015. San Diego Forward: The Regional Plan. October 2015.

Available: http://www.sdforward.com/pdfs/RP_final/The%20Plan%20-%20combined.pdf.

SANDAG. 2018. Regional Growth Forecast. Series 14 Regional Growth Forecast Documentation and Sustainable Communities Strategy Land Use Pattern Subregional Allocation. May 25, 2018. https://www.sandag.org/- /media/SANDAG/Documents/PDF/data-and-research/socioeconomics/estimates-and-forecasts/series- 14-regional-growth-forecast-SCS-land-use-pattern-subregional.pdf SANDAG. 2021a. San Diego Forward: The 2021 Regional Plan. Adopted December 10, 2021. https://www.sandag.org/regional-plan/2021-regional-plan/final-2021-regional-plan.

SANDAG. 2021b. Appendix F: Regional Growth Forecast and Sustainable Communities Strategy Land Use Pattern. December 2021. https://www.sandag.org/-/media/SANDAG/Documents/PDF/regional-plan/ 2021-regional-plan/final-2021-regional-plan/2021-regional-plan-appendix-f-2021-12-01.pdf SANDAG. 2021c. Appendix K: Regional Housing Needs Assessment Plan. December 2021. https://www.sandag.org/-/media/SANDAG/Documents/PDF/regional-plan/2021-regional-plan/ final-2021-regional-plan/2021-regional-plan-appendix-k-2021-05-01.pdf.

SCAQMD (South Coast Air Quality Management District). 2003. Final 2003 AQMP Appendix V. Modeling and Attainment Demonstrations. August 2003. https://www.aqmd.gov/docs/default-source/clean-air- plans/air-quality-management-plans/2003-air-quality-management-plan/2003-aqmp-appendix- v.pdf?sfvrsn=2
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-5
SCAQMD. 2008. Final Localized Significance Threshold Methodology. Revised July 2008. Available:
http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significance-thresholds/ final-lst-methodology-document.pdf?sfvrsn=2.docs/default-source/ceqa/handbook/ localized-significance-thresholds/appendix-c-mass-rate-lst-look-up- SCAQMD. 2014. Warehouse Truck Trip Study Data Results and Usage, July. https://www.aqmd.gov/home/ rules-compliance/ceqa/air-quality-analysis-handbook/high-cube-warehouse SCAQMD. 2023. South Coast AQMD Air Quality Significance Thresholds. Available: https://www.aqmd.gov/ docs/default-source/ceqa/handbook/south-coast-aqmd-air-quality-significance- thresholds.pdf?sfvrsn=25.

SDAPCD (San Diego Air Pollution Control District). 1976. Rules and Regulations. Regulation IV. Prohibitions. Rule

51. Nuisance. Effective November 8, 1976. Available: https://www.sdapcd.org/content/dam/ sdc/apcd/PDF/Rules_and_Regulations/Prohibitions/APCD_R50-1-51.pdf.

SDAPCD. 1979. Rules and Regulations. Regulation IV. Prohibitions. Rule 67.7. Cutback and Emulsified Asphalts.

Effective August 29, 1979. Available: https://www.sdapcd.org/content/dam/sdc/apcd/PDF/ Rules_and_Regulations/Prohibitions/APCD_R67-7.pdf.

SDAPCD. 1996. Regulation II: Permits; Rule 10: Permits Required. Effective May 15, 1996. Available:
https://www.sdapcd.org/content/dam/sdapcd/documents/rules/current-rules/Rule-10.pdf SDAPCD. 1997. SDAPCD Regulation IV: Prohibitions; Rule 50: Visible Emissions. Effective August 13, 1997.

Available: http://www.sandiegocounty.gov/content/dam/sdc/apcd/PDF/Rules_and_Regulations/ Prohibitions/APCD_R50.pdf.

SDAPCD. 2005. Measures to Reduce Particulate Matter in San Diego County. December 2005. Available:
https://www.sandiegocounty.gov/content/dam/sdc/apcd/PDF/Air%20Quality%20Planning/ PM-Measures.pdf.

SDAPCD. 2009. SDAPCD Regulation IV: Prohibitions; Rule 55: Fugitive Dust. June 24, 2009. Available:
http://www.sandiegocounty.gov/content/dam/sdc/apcd/PDF/Rules_and_Regulations/ Prohibitions/APCD_R55.pdf.

SDAPCD. 2015. SDAPCD Regulation IV: Prohibitions; Rule 67.0.1: Architectural Coatings. June 24, 2015.

Available: https://www.arb.ca.gov/DRDB/SD/CURHTML/R67.0.1.pdf.

SDAPCD. 2016a. 2008 Eight-Hour Ozone Attainment Plan for San Diego County. Updated December 2016.

Available: https://www.sdapcd.org/content/dam/sdapcd/documents/grants/planning/ 8-Hr-O3%20Attain%20Plan-08%20Std.pdf
SDAPCD 2016b. 2008 Eight-Hour Ozone Attainment Plan for San Diego County. Final. December 2016.

SDAPCD. 2020. Annual Air Quality Monitoring Network Report 2020. Available: https://www.sdapcd.org/ content/dam/sdapcd/documents/monitoring/2020-Network-Report.pdf. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-6
SDAPCD. 2021. Annual Air Quality Monitoring Network Report 2021. Available: https://www.sdapcd.org/ content/dam/sdapcd/documents/monitoring/2021-Network-Report.pdf.

SDAPCD. 2022a. Annual Air Quality Monitoring Network Report 2022. Available: https://www.sdapcd.org/ content/dam/sdapcd/documents/monitoring/2022-Network-Report.pdf.

SDAPCD. 2022b. Attainment Status. Available: https://www.sdapcd.org/content/sdapcd/planning/ attainment-status.html.

SDAPCD. 2022c. Supplemental Guidelines for Submission of Air Toxics “Hot Spots” Program Health Risk Assessments (HRAs). April. Available: https://www.sdapcd.org/content/dam/sdapcd/documents/ permits/air-toxics/Hot-Spots-Guidelines.pdf.

SJVAPCD (San Joaquin Valley Air Pollution Control District). 2022. Guidance for Air Dispersion Modeling. Available:
http://www.valleyair.org/busind/pto/tox_resources/Modeling_Guidance.pdf.

WRCC (Western Regional Climate Center). 2016. “Chula Vista Climate Summary.” Available: https://wrcc.dri.edu/ cgi-bin/cliMAIN.pl?ca1758.

Section 5.3 Biological Resources
CCB (Center for Conservation Biology). 2022. OspreyWatch. Accessed on May 20, 2022. http://www.osprey- watch.org.

City of Chula Vista. 2003. City of Chula Vista MSCP Subarea Plan. February 2003. https://www.chulavistaca.gov/ departments/development-services/planning/habitat-conservation.

City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan.

City of Chula Vista. 2019. Chula Vista Municipal Code. Chapter 17.35 Habitat Loss and Incidental Take (HLIT). Passed November 12, 2019.

Dudek. 2006. Biological Resources Report and Impact Assessment for Otay Ranch Villages 2 & 3, City of Chula Vista, San Diego County, California. Prepared for the Otay Ranch Company. February 2006.

Oberbauer, T., M. Kelly, and J. Buegge. 2008. Draft Vegetation Communities of San Diego County [Internet]. Based on “Preliminary Descriptions of the Terrestrial Natural Communities of California,” R.F. Holland, 1986. https://www.sandiegocounty.gov/content/dam/sdc/pds/ceqa/Soitec-Documents/Final-EIR- Files/references/rtcref/ch9.0/rtcrefaletters/O14%202014-12-19_OberbauerTM2008.pdf.

Section 5.4 Cultural and Tribal Cultural Resources
City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-7
City of Chula Vista. 2011a. City of Chula Vista Municipal Code – 21.04.100 Historical Designation – Findings of Fact and Eligibility Criteria. Amended 2011. Accessed September 4, 2020. https://chulavista.municipal.codes/CVMC/21.04.100.

City of Chula Vista. 2011b. City of Chula Vista Historic Preservation Program. Adopted July 19, 2011. Accessed September 8, 2020. http://www.chulavistaca.gov/home/showdocument?id=10964.

NPS (National Park Service). 1997. National Register Bulletin No. 15: How to Apply the National Register Criteria for Evaluation.

OPR (California Governor’s Office of Planning and Research). 2005. State of California Tribal Consultation Guidelines: Supplement to General Plan Guidelines. November 14, 2005. https://opr.ca.gov/docs/011414_Updated_Guidelines_922.pdf.

Section 5.5 Energy
CAPCOA (California Air Pollution Control Officers Association). 2022. California Emissions Estimator Model (CalEEMod) User’s Guide, Version 2022.1. Prepared by ICF, in collaboration with Sacramento Metropolitan Air Quality Management District, Fehr & Peers, STI, and Ramboll. April. Available:
https://caleemod.com/documents/user-guide/CalEEMod_User_Guide_v2022.1.pdf CEC (California Energy Commission). 2022. California Energy Demand Forecast, 2021 - 2035 Baseline Forecast - High Demand Case. January 2022. https://www.energy.ca.gov/data-reports/reports/ integrated-energy-policy-report/2021-integrated-energy-policy-report/2021-1.

CEC. 2023a. California Energy Demand Update, 2022-2035 – CEDU 2022 Baseline Forecast – SCE.

January 2023. https://efiling.energy.ca.gov/GetDocument.aspx?tn=248378 CEC. 2023b. “Gas Consumption by County.” http://ecdms.energy.ca.gov/gasbycounty.aspx.

CEC. 2023c. “Electricity Consumption by County.” http://ecdms.energy.ca.gov/elecbycounty.aspx.

City of Chula Vista. 2001. City Energy Strategy and Action Plan. Approved May 29, 2001. Accessed September 17, 2020. https://www.chulavistaca.gov/home/showdocument?id=5439.

City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended March 17, 2020.

Accessed September 17, 2020. https://www.chulavistaca.gov/home/showdocument?id=9337.

City of Chula Vista. 2011. Climate Adaptation Strategies – Implementation Plans. Adopted May 2011. Accessed September 15, 2020. https://www.chulavistaca.gov/home/showdocument?id=5443.

City of Chula Vista. 2017. Chula Vista Climate Action Plan (CAP). Adopted September 2017. Accessed September 15, 2020. https://www.chulavistaca.gov/home/showdocument?id=15586.

CPUC (California Public Utilities Commission). 2021. “Natural Gas and California.” Available:
http://www.cpuc.ca.gov/natural_gas/.

CPUC. 2022. “CPUC Sets Biomethane Targets for Utilities.” February 2022. Available: https://www.cpuc.ca.gov/ news-and-updates/all-news/cpuc-sets-biomethane-targets-for-utilities. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-8
EIA (U.S. Energy Information Administration). 2022. “State Electricity Profiles – California Electricity Profile 2021.” November 2022. Available: https://www.eia.gov/electricity/state/california/index.php.

EIA. 2023a. “California State Energy Profile.” Last updated April 20, 2023. Available: https://www.eia.gov/ state/print.php?sid=CA
EIA. 2023b. “Natural Gas Consumption by End Use.” January 2023. Available: https://www.eia.gov/ dnav/ng/ng_cons_sum_a_EPG0_VC0_mmcf_a.htm
EIA. 2023c. “Total Petroleum Consumption Estimates, 2020.” 2021. Available: https://www.eia.gov/ state/seds/data.php?incfile=/state/seds/sep_fuel/html/fuel_use_pa.html&sid=US&sid=CA EPA (U.S. Environmental Protection Agency). 2023b. “Overview for Renewable Fuel Standard.” Last updated February 20, 2023. Available: https://www.epa.gov/renewable-fuel-standard-program/ overview-renewable-fuel-standard.

SANDAG (San Diego Association of Governments). 2014. Regional Energy Strategy for the San Diego Region.

December 2009; updated June 2014. Accessed August 2024. https://www.sandag.org/-/ media/SANDAG/Documents/PDF/projects-and-programs/environment/regional-energy-planning/ regional-energy-strategy-2014-06-01.pdf.

SDG&E (San Diego Gas & Electric). 2021. “SDG&E Builder Services.” 2021. Available: https://www.sdge.com/ sites/default/files/documents/SDGE%20Builder%20Services%20Guidebook%20March2021.pdf The Climate Registry. 2023. The Climate Registry 2023 Default Emission Factors. June 2023. https://theclimateregistry.org/wp-content/uploads/2023/06/2023-Default-Emission-Factors-Final-1.pdf Section 5.6 Geology and Soils
CGS (California Geological Survey). 2008. Special Publication 117A: Guidelines for Evaluating and Mitigating Seismic Hazards in California.

City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan.

City of Chula Vista. 2022. BMP Design Manual: For Permanent Site Design, Storm Water Treatment, and Hydromodification Management. March 2019; updated August 2021; approved June 2, 2022.

Cohen, K.M., S.C. Finney, P.L. Gibbard, and J.-X. Fan. 2023. “The ICS International Chronostratigraphic Chart.” Episodes 36: 199–204. Published 2013; updated in 2023. http://www.stratigraphy.org/ ICSchart/ChronostratChart2023-04.pdf.

County of San Diego. 2009. Guidelines for Determining Significance, Paleontological Resources. County of San Diego, Department of Public Works, Department of Planning and Land Use. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-9
County of San Diego. 2017. Multi-Jurisdictional Hazard Mitigation Plan, San Diego, California. October 2017. https://www.sandiegocounty.gov/content/dam/sdc/oes/emergency_management/HazMit/2018/ 2018%20Hazard%20Mitigation%20Plan.pdf.

Deméré, T.A., 1982. “Review of the Lithostratigraphy, Biostratigraphy and Age of the San Diego Formation.” In Geologic Studies in San Diego, edited by P.L. Abbott, 127–134. San Diego Association of Geologists, Field Trip Guidebook.

Deméré, T.A., 1983. “The Neogene San Diego Basin: A Review of the Marine Pliocene San Diego Formation.” In Cenozoic Marine Sedimentation, Pacific Margin, U.S.A., edited by D.K. Larue and R.J. Steel, 187–195.

Society of Economic Paleontologists and Mineralogists, Pacific Section, Book 28.

Kennedy, M.P. 1975. “Geology of the San Diego Metropolitan Area, California. In California Division of Mines and Geology Bulletin 200, Section A – Western San Diego Metropolitan Area, 9–39.

Kennedy, M.P., and S.S. Tan. 2008. Geologic Map of the San Diego 30′ × 60′ Quadrangle, California. California Geological Survey, Regional Geologic Map RGM-3, 1:100,000 scale.

SVP (Society of Vertebrate Paleontology). 2010. “Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources.” SVP, Impact Mitigation Guidelines Revision Committee. http://vertpaleo.org/Membership/Member-Ethics/SVP_Impact_Mitigation_Guidelines.aspx.

Section 5.7 Greenhouse Gas Emissions
CAEP (California Association of Environmental Professionals). 2016. Final White Paper Beyond 2020 and Newhall: A Field Guide to New CEQA Greenhouse Gas Thresholds and Climate Action Plan Targets for California. October 18. 2026. Accessed August 16, 2024. https://califaep.org/docs/AEP- 2016_Final_White_Paper.pdf.

CALGreen (California Green Building Code). 2022. 2022 Green Building Standards Code. Accessed August 2024. https://codes.iccsafe.org/content/CAGBC2022P1.

CalRecycle (California Department of Resources Recycling and Recovery). 2015. AB 341 Report to the Legislature. August 2015. Accessed August 16, 2024. https://www.sandiegocounty.gov/content/ dam/sdc/pds/ceqa/JVR/AdminRecord/IBR/381%20Cal%20Recycle%202018%20AB%20371% 20Report%202015.pdf.

CalRecycle. 2019. “AB 341 Report to the Legislature (DRRR-2015-1538).” August 28, 2015.

CAPCOA (California Air Pollution Control Officers Association). 2008. CEQA & Climate Change: Evaluating and Addressing Greenhouse Gas Emissions from Projects Subject to the California Environmental Quality Act.

January 2008.

CAPCOA. 2022. Appendix D, Technical Source Documentation for Emissions Calculations. In California Emissions Estimator Model (CalEEMod) User’s Guide, Version 2022.1. Prepared by ICF, in collaboration with Sacramento Metropolitan Air Quality Management District, Fehr & Peers, STI, and Ramboll. April.

Available: https://caleemod.com/documents/user-guide/CalEEMod_User_Guide_v2022.1.pdf. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-10
CARB (California Air Resources Board). 2008a. Climate Change Scoping Plan: A Framework for Change.

December 2008. http://www.arb.ca.gov/cc/scopingplan/document/scopingplandocument.htm.

CARB. 2014a. First Update to the Climate Change Scoping Plan Building on the Framework Pursuant to AB 32 – The California Global Warming Solutions Act of 2006. May 2014. Accessed October 2017. http://www.arb.ca.gov/cc/scopingplan/2013_update/first_update_climate_change_scoping_plan.pdf.

CARB. 2014b. “California Greenhouse Gas Inventory for 2000–2012—by Category as Defined in the 2008 Scoping Plan.” Last updated March 24, 2014. Accessed October 2017. http://www.arb.ca.gov/ cc/inventory/data/tables/ghg_inventory_scopingplan_00-12_2014-03-24.pdf.

CARB. 2017. The 2017 Climate Change Scoping Plan Update. January 20. Accessed January 2017. https://www.arb.ca.gov/cc/scopingplan/2030sp_pp_final.pdf.

CARB. 2019. 2017 Scoping Plan-Identified VMT Reductions and Relationships to State Climate Goals. January 2019. https://ww2.arb.ca.gov/sites/default/files/2019-01/2017_sp_vmt_reductions_jan19.pdf CARB. 2021. 2020 Mobile Source Strategy. October 28, 2021. https://ww2.arb.ca.gov/sites/default/files/2021- 12/2020_Mobile_Source_Strategy.pdf
CARB. 2022a. 2022 Scoping Plan Update. November 16, 2022. Accessed December 2022. https://ww2.arb.ca.gov/our-work/programs/ab-32-climate-change-scoping-plan/2022-scoping- plan-documents
CARB. 2022b. Advanced Clean Cars II. https://ww2.arb.ca.gov/our-work/programs/advanced-clean-cars- program/advanced-clean-cars-ii.

CARB. 2022c. California’s Greenhouse Gase Emissions for 2000–2020. October 26, 2022. https://ww2.arb.ca.gov/sites/default/files/classic/cc/inventory/2000-2020_ghg_inventory_trends.pdf.

CARB. 2023. California Greenhouse Gas Emissions from 2000 to 2021: Trends of Emissions and Other Indicators. December 14, 2023. Accessed January 2024, at https://ww2.arb.ca.gov/sites/ default/files/2023-12/2000_2021_ghg_inventory_trends.pdf.

City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended March 17, 2020. Accessed October 2017. http://www.chulavistaca.gov/departments/development-services/ planning/general-plan.

City of Chula Vista. 2017. Climate Action Plan. Accessed October 2017. http://www.chulavistaca.gov/home/ showdocument?id=15586.

City of Chula Vista. 2022. “2020 Community Greenhouse Gas Emissions Inventory.” June 2022. Accessed August 16, 2024. https://www.chulavistaca.gov/home/showpublisheddocument/ 26651/638264070368670000.

CNRA (California Natural Resources Agency). 2009a. Final Statement of Reasons for Regulatory Action:

Amendments to the State CEQA Guidelines Addressing Analysis and Mitigation of Greenhouse Gas Emissions Pursuant to SB 97. December 2009.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-11
CNRA. 2009b. 2009 California Climate Adaptation Strategy: A Report to the Governor of the State of California in Response to Executive Order S-13-2008. Accessed August 16, 2024. https://resources.ca.gov/ CNRALegacyFiles/docs/climate/Statewide_Adaptation_Strategy.pdf.

CNRA. 2014. Safeguarding California: Reducing Climate Risk. An update to the 2009 California Climate Adaptation Strategy. Accessed October 2017. http://resources.ca.gov/docs/climate/ Final_Safeguarding_CA_Plan_July_31_2014.pdf.

CNRA. 2018. Fourth California Climate Change Assessment: California’s Changing Climate 2018. Updated August 27, 2018. https://www.energy.ca.gov/sites/default/files/2019-11/20180827_Summary_Brochure_ADA.pdf.

CNRA. 2019. Fourth California Climate Change Assessment: San Diego Regional Repot Updated March 21, 2019. https://www.energy.ca.gov/sites/default/files/2019-11/Reg_Report-SUM-CCCA4-2018- 009_SanDiego_ADA.pdf.

EPA. 2007. The Energy Independence and Security Act of 2007. December 19. Accessed October 2017. https://www.gpo.gov/fdsys/pkg/BILLS-110hr6enr/pdf/BILLS-110hr6enr.pdf.

EPA. 2016. “Glossary of Climate Change Terms.” August 9, 2016. Accessed August 2016. https://www3.epa.gov/ climatechange/glossary.html.

EPA. 2022. “Criteria Air Pollutants.” August 9, 2022. Accessed March 2023. Available: https://www.epa.gov/ criteria-air-pollutants.

EPA. 2023a. “Causes of Climate Change.” Last Updated April 25, 2023. https://www.epa.gov/climatechange- science/causes-climate-change.

EPA. 2023b. Inventory of U.S. Greenhouse Gas Emissions and Sinks: 1990-2021. U.S. Environmental Protection Agency, EPA 430-R-23-002. https://www.epa.gov/ghgemissions/inventory-us-greenhouse-gas-emissions- and-sinks-1990-2021.

EPA and NHTSA (Department of Transportation’s National Highway Traffic Safety Administration). 2016.

Regulations and Standards: Heavy-Duty. EPA and DOT Finalize Greenhouse Gas and Fuel Efficiency Standards for Medium- and Heavy-Duty Engines and Vehicles. Last updated on August 30, 2016.

Accessed October 2017. https://www3.epa.gov/otaq/climate/regs-heavy-duty.htm.

IPCC (Intergovernmental Panel on Climate Change). 2007. IPCC Fourth Assessment Synthesis of Scientific-Technical Information Relevant to Interpreting Article 2 of the U.N. Framework Convention on Climate Change.

IPCC. 2014. Climate Change 2014 Synthesis Report: A Report of the Intergovernmental Panel on Climate Change. Contribution of Working Groups I, II and III to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change. Accessed August 2016. http://www.ipcc.ch/ report/ar5/syr/.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-12
IPCC, 2018: Summary for Policymakers. In: Global Warming of 1.5°C. An IPCC Special Report on the impacts of global warming of 1.5°C above pre-industrial levels and related global greenhouse gas emission pathways, in the context of strengthening the global response to the threat of climate change, sustainable development, and efforts to eradicate poverty [Masson-Delmotte, V., P. Zhai, H.-O. Pörtner, D.

Roberts, J. Skea, P.R. Shukla, A. Pirani, W. Moufouma-Okia, C. Péan, R. Pidcock, S. Connors, J.B.R.

Matthews, Y. Chen, X. Zhou, M.I. Gomis, E. Lonnoy, T. Maycock, M. Tignor, and T. Waterfield (eds.)]. In Press. Available: https://www.ipcc.ch/site/assets/uploads/sites/2/2019/05/SR15_SPM_version_ report_LR.pdf.

OEHHA (Office of Environmental Health Hazard Assessment). 2018. Indicators of Climate Change. August 30.

Available: https://oehha.ca.gov/climate-change/document/indicators-climate-change-california.

OPR. 2008. CEQA and Climate Change: Addressing Climate Change through California Environmental Quality Act (CEQA) Review.

OPR. 2018.Discussion Draft CEQA and Climate Change Advisory. December 2018. https://opr.ca.gov/ docs/20181228-Discussion_Draft_Climate_Change_Adivsory.pdf PBL (PBL Netherlands Environmental Assessment Agency). 2022. Trends in Global CO2 and Total Greenhouse Gas Emissions, 2021 Summary Report. Accessed November 2022. https://www.pbl.nl/sites/default/ files/downloads/pbl-2022-trends-in-global-co2-and_total-greenhouse-gas-emissions-2021-summary- report_4758.pdf
SANDAG. 2021. 2021 Regional Plan. December 2021. https://www.sandag.org/-/media/SANDAG/Documents/ PDF/regional-plan/2021-regional-plan/final-2021-regional-plan/final-2021-regional-plan-flipbook.pdf SCAQMD (South Coast Air Quality Management District). 2008. Draft Guidance Document – Interim CEQA Greenhouse Gas (GHG) Significance Threshold
SDG&E (San Diego Gas and Electric). 2022. 2021 Power Content Label Sand Diego Gas & Electric. September 2022. https://www.sdge.com/sites/default/files/documents/FINAL_S2210024_Power_ Content_Label.pdf
Under 2 (Under 2 Coalition). 2016. “Global Climate Leadership: Under2 Memorandum of Understanding (MoU).” Accessed August 16, 2024. https://www.theclimategroup.org/sites/default/files/2021-10/ Under2%20MOU_English_2021.pdf.

Section 5.8 Hazards and Hazardous Materials
California DTSC (Department of Toxic Substances Control). 2024. EnviroStor. Accessed February 12, 2024. https://www.envirostor.dtsc.ca.gov/public/map/?myaddress=rohr+chula+vista. https://calepa.ca.gov/sitecleanup/corteselist/.

CalEPA (California Environmental Protection Agency). 2024. Site Cleanup-Cortese-CDOCAO List. Accessed February 12, 2024.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-13
SWRCB (State Water Resources Control Board). 2024. GeoTracker. Accessed February 12, 2024. https://geotracker.waterboards.ca.gov/map/?CMD=runreport&myaddress=rohr+chula+vista.

City of Chula Vista. 2004. Hazard Mitigation Plan. Accessed October 2, 2023. https://www.sandiegocounty.gov/ content/dam/sdc/oes/emergency_management/HazMit/2017/City-of-Chula-Vista-HazMit-Section-5.pdf.

City of Chula Vista. 2021. Chula Vista General Plan. Adopted December 13, 2005; amended July 13, 2021.

Accessed September 29, 2023. https://www.chulavistaca.gov/departments/development-services/ planning/planning-digital-library/general-plan.

City of Chula Vista. 2023a. Volunteers. City of Chula Vista Fire Department Information Page. Accessed September 29, 2023. http://www.chulavistaca.gov/departments/volunteer-programs.

City of Chula Vista. 2023b. BMP Design Manual for Permanent Site Design, Storm Water Treatment, and Hydromodifcation Management. Augus 2023 Update. Accessed February 12, 2024. https://www.chulavistaca.gov/home/showpublisheddocument/26756/638291652881200000.

County of San Diego. 2023a. Multi-Jurisdictional Hazard Mitigation Plan. Prepared by the County of San Diego Office of Emergency Services and the San Diego County Unified Disaster Council. Accessed September 29, 2023. https://www.sandiegocounty.gov/content/dam/sdc/oes/emergency_management/ HazMit/2023/MJHMP%20SD%20County%20Base%20Plan%202023.pdf.

County of San Diego. 2023b. Alert San Diego. Accessed November 2, 2023. https://www.readysandiego.org/ content/dam/alertsandiego/preparedness/en/tsunami/Map_SD_ChulaVistaFINALv2.pdf.

County of San Diego and USDCESO (Unified San Diego County Emergency Organization). 2022. Operational Area Emergency Operations Plan. September 2022. Accessed September 29, 2023. https://www.sandiegocounty.gov/content/dam/sdc/oes/emergency_management/plans/op-area-plan/ 2023-eop/EOP2023_Complete%20Plan.pdf.

Gallardo, Susan. Principal Engineer at GSI Environmental, Inc. 2024. Personal communication via email to Michael Knapton and Dudek on February 15, 2024.

Haley & Aldrich. 2023. Personal communication. Overview of Rohr Aircraft Environmental Cleanup Effort, February 2023.

OES (California Governor’s Office of Emergency Services). 2008. California Emergency Services Act, California Disaster Assistance Act, Emergency Compacts, and California Disaster and Civil Defense Master Mutual Aid Agreement. https://oes.tularecounty.ca.gov/oes/what-is-oes/california-emergency-services-act/.

SDCRAA (San Diego County Regional Airport Authority). 2010. Brown Field Municipal Airport Land Use Compatibility Plan. Airport Land Use Commission. Accessed September 29, 2023. https://www.san.org/ DesktopModules/Bring2mind/DMX/API/Entries/Download?EntryId=16145&Command=Core_ Download&language=en-US&PortalId=0&TabId=807.

SDCRAA. 2015. Naval Outlying Landing Field Imperial Beach, Airport Land Use Compatibility Plan. Accessed September 29, 2023. https://www.san.org/DesktopModules/Bring2mind/DMX/API/ Entries/Download?EntryId=16129&Command=Core_Download&language=en-US& PortalId=0&TabId=807.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-14
San Diego RWQCB (Regional Water Quality Control Board). 2021. Cleanup and Abatement Order No. R-9-2021- 0042, An Order Directing Rohr and Goodrich Corporation to Clean Up or Abate the Effects of Waste Discharged from the Rohr/Goodrich North Campus Property, Chula Vista, San Diego County. Accessed September 30, 2023. https://www.waterboards.ca.gov/sandiego/board_decisions/adopted_orders/ 2021/r9_2021_0042.pdf.

San Diego RWQCB. 2023. May 30, 2023, Data Gap Investigation Report (Redline) – North Campus Parcel B, Chula Vista, CA (Site ID #2092900).

SWRCB (State Water Quality Control Board). 2024. GeoTracker [data management system]. https://geotracker.waterboards.ca.gov/.

Section 5.9 Hydrology and Water Quality
Blankenship, T.G. 1997. Hydrogeology of the San Diego Formation, Chula Vista and National City, California. A Thesis Presented to the Faculty of San Diego State University. Accessed November 6, 2023. https://digitallibrary.sdsu.edu/islandora/object/sdsu%3A26210.

CGS (California Geological Survey). 2022. San Diego County Tsunami Hazard Areas. Accessed November 2, 2023. https://www.conservation.ca.gov/cgs/tsunami/maps/san-diego.

City of Chula Vista. 2018. Jurisdictional Runoff Management Program. Accessed November 1, 2023. https://www.chulavistaca.gov/home/showpublisheddocument/10060/636555985776200000.

City of Chula Vista. 2021. Chula Vista General Plan. Adopted December 13, 2005; amended July 13, 2021.

Accessed October 14, 2023. https://www.chulavistaca.gov/departments/development-services/ planning/planning-digital-library/general-plan.

City of Chula Vista. 2023a. BMP Design Manual for Permanent Site Design, Storm Water Treatment and Hydromodification Management. August 2023 Update. Accessed November 1, 2023. https://www.chulavistaca.gov/home/showpublisheddocument/26756/638291652881200000.

City of Chula Vista. 2023b. Water. Accessed November 2, 2023. https://www.chulavistaca.gov/departments/ clean/conservation/water-conservation-reuse#:~:text=The%20City%20of%20Chula%20Vista,conserve% 20water%20throughout%20the%20community.

City of Chula Vista, City of Coronado, City of Imperial Beach, City of La Mesa, City of Lemon Grove, City of National City, City of San Diego, County of San Diego, Port of San Diego, and San Diego County Regional Airport Authority. 2008. San Diego Bay Watershed Urban Runoff Management Program Document. March 24, 2008. Accessed November 1, 2023. https://pantheonstorage.blob.core.windows.net/environment/ Watershed-Urban-Runoff-Management-Program-Final-Document-2008.pdf.

County of San Diego. 2023. Alert San Diego. Accessed November 2, 2023. https://www.readysandiego.org/content/ dam/alertsandiego/preparedness/en/tsunami/Map_SD_ChulaVistaFINALv2.pdf.

EPA (U.S. Environmental Protection Agency). 2023. How’s My Waterway? Accessed October 15, 2023. https://mywaterway.epa.gov/community/chula%20vista,%20ca/overview. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-15
FEMA (Federal Emergency Management Agency). 2023. “FEMA Flood Map Service Center: Search by Address.” FIRM panel 06073C1913H, Effective December 20, 2019. Accessed November 2, 2023. https://msc.fema.gov/portal/search#searchresultsanchor.

HDR. 2021a. 2020 Urban Water Management Plan (Draft), Sweetwater Authority, Chula Vista, California. April 13, 2021. Accessed November 2, 2023. chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/ https://www.sweetwater.org/DocumentCenter/View/2326/2020-Urban-Water-Management-Plan-Draft.

HDR. 2021b. Water Distribution System Master Plan, Sweetwater Authority, December 28, 2021. Accessed November 3, 2023. https://www.sweetwater.org/DocumentCenter/View/2764/2020-Water-Distribution- System-Master-Plan-PDF.

Otay Water District. 2023. At-A-Glance. Accessed November 2, 2023. https://otaywater.gov/about-otay/ otay-at-a-glance/.

San Diego Bay Responsible Parties. 2016. San Diego Bay Watershed Management Area, Water Quality Improvement Plan. February 2016. Prepared by City of Chula Vista, City of Coronado, City of Imperial Beach, City of La Mesa, City of Lemon Grove, City of National City, City of San Diego, County of San Diego, Port of San Diego, San Diego County Regional Airport Authority, and Caltrans. Accessed November 1, 2023. https://projectcleanwater.org/document/san-diego-bay-sdb-water-quality-improvement-plan-wqip/.

San Diego Foundation. 2014. San Diego Foundation. 2014. San Diego, 2050 Is Calling. How Will We Answer? Facing the Future: How Science Can Help Prepare San Diego Regional Leaders for Climate Change. July 2014. Accessed October 15, 2023. http://catcher.sandiego.edu/items/usd/2050.pdf.

San Diego RWQCB. 2021. Water Quality Control Plan for the San Diego Basin. Accessed October 14, 2023. https://www.waterboards.ca.gov/sandiego/water_issues/programs/basin_plan/.

SWRCB (State Water Resources Control Board). 2017. Category 5, 2014 and 2016 California 303(d) List of Water Quality Limited Segments. Accessed October 15, 2023. https://www.waterboards.ca.gov/water_issues/ programs/tmdl/2014_16state_ir_reports/category5_report.shtml.

SWRCB. 2023. “Total Maximum Daily Load (TMDL) Program.” Accessed October 14, 2023. https://www.waterboards.ca.gov/water_issues/programs/tmdl/.

Sweetwater Authority. 2023. Our Water. Accessed November 2, 2023. https://www.sweetwater.org/31/Our-Water.

Section 5.10 Land Use and Planning
City of Chula Vista. 2001. City of Chula Vista Municipal Code, Title 19: Zoning Code.

City of Chula Vista. 2003. City of Chula Vista MSCP Subarea Plan. February 2003. https://www.chulavistaca.gov/ departments/development-services/planning/habitat-conservation.

City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended July 13, 2021. https://www.chulavistaca.gov/departments/development-services/planning/planning-digital-library/ general-plan.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-16
City of Chula Vista. 2012. Chula Vista Bayfront Local Coastal Program Land Use Plan. Adopted September 25, 2012. Amended December 5, 2017. https://www.chulavistaca.gov/home/showdocument?id=8421.

City of Chula Vista. 2001. Chula Vista Municipal Code (CVMC). 2001. Accessed May 2023. https://chulavista.municipal.codes/CVMC
SANDAG. 2021a. 2021 Regional Plan. December 2021. https://www.sandag.org/regional-plan/2021-regional- plan/-/media/8D0F181A086844E3A84C3D44576BED6B.ashx.

SANDAG. 2021b. Appendix M: Progress on Near-Term and Continuing Actions from San Diego Forward: The 2015 Regional Plan and the 2019 Federal Regional Transportation Plan. December 2021. https://www.sandag.org/-/media/SANDAG/Documents/PDF/regional-plan/2021-regional-plan/ final-2021-regional-plan/2021-regional-plan-appendix-m-2021-05-01.pdf.

SDAPCD (San Diego Air Pollution Control District). 2005. Measures to Reduce Particulate Matter in San Diego County.

Section 5.11 Noise
Baltrënas, P., D. Kazlauskas, and E. Petraitis. 2004. “Testing on Noise Level Prevailing at Motor Vehicle Parking Lots and Numeral Simulation of Its Dispersion.” Journal of Environmental Engineering and Landscape Management 12(2): 63–70.

Caltrans (California Department of Transportation). 2013. Technical Noise Supplement to the Traffic Noise Analysis Protocol. September 2013.

Caltrans. 2020. Transportation and Construction Vibration Guidance Manual. Sacramento, California: Division of Environmental Analysis, Environmental Engineering, Hazardous Waste, Air, Noise, Paleontology Office.

April 2020. https://dot.ca.gov/-/media/dot-media/programs/environmental-analysis/documents/ env/tcvgm-apr2020-a11y.pdf.

City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended March 17, 2020. https://www.chulavistaca.gov/departments/development-services/planning/ planning-digital-library/general-plan.

City of Chula Vista. 2020. Chula Vista Municipal Code. Updated February 25, 2020. https://chulavista.municipal.codes/CVMC.

DOT (U.S. Department of Transportation). 2006. FHWA Roadway Construction Noise Model: User’s Guide. Final Report. FHWA-HEP-06-015. DOT-VNTSC-FHWA-06-02. Cambridge, Massachusetts: DOT, Research and Innovative Technology Administration. August 2006.

FHWA (Federal Highway Administration). 2008. Roadway Construction Noise Model (RCNM), Software Version 1.1.

Washington, DC: U.S. Department of Transportation, Research and Innovative Technology Administration, John A. Volpe National Transportation Systems Center, Environmental Measurement and Modeling Division. December 8, 2008.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-17
FICON (Federal Interagency Committee on Noise). 1992. Federal Agency Review of Selected Airport Noise Analysis Issues. August 1992. Accessed August 2024. https://www.faa.gov/sites/faa.gov/files/ reports_noise_analysis.pdf.

FTA (Federal Transit Administration). 2018. Transit Noise and Vibration Impact Assessment. Final Report. FTA- Report No. 0123. September 2018. https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/ research-innovation/118131/transit-noise-and-vibration-impact-assessment-manual-fta-report- no-0123_0.pdf.

Google Earth. 2023. “Images of Project Site” [aerial images]. Mountainview, California: Google Earth Mapping Service. Accessed August 2023.

ICC (International Construction Code). 2019. California Building Code. Section 1206 – Sound Transmission. https://codes.iccsafe.org/content/chapter/15426/.

ISO (International Organization for Standardization). 1996. “Acoustics – Attenuation of Sound During Propagation Outdoors, Part 2: General Method of Calculation.” Standard 9613-2.

OPR (Governor’s Office of Planning and Research). 2017. 2017 State of California General Plan Guidelines.

Salter (Charles M. Salter Associates). 2014. Midpoint at 237: Loading Dock Noise Study. San Jose, California:

Charles M. Salter Associates. March 2014.

Section 5.12 Population and Housing
City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended July 13, 2021. https://www.chulavistaca.gov/departments/development-services/planning/planning-digital-library/ general-plan.

City of Chula Vista. 2020. “Housing Element Update 2021–2029 Presentation.” Accessed March 2023. https://www.chulavistaca.gov/home/showdocument?id=21346.

City of Chula Vista. 2012a. Guidelines to the Balanced Communities Policy. Adopted September 25, 2012; revised December 15, 2015. https://www.chulavistaca.gov/home/showdocument?id=4786.

City of Chula Vista. 2012b. Chula Vista Bayfront Local Coastal Program Land Use Plan. Adopted September 25, 2012. Amended December 5, 2017. https://www.chulavistaca.gov/home/showdocument?id=8421.

City of Chula Vista. 2021c. City of Chula Vista Housing Element of the General Plan. Adopted July 13, 2021; amended September 13, 2022. https://www.chulavistaca.gov/home/showdocument?id=5503.

SANDAG. 2018. Series 14 Regional Growth Forecast Documentation and Baseline Subregional Allocation.

May 25, 2018.https://www.sandag.org/data-and-research/socioeconomics/-/media/ 285C8F0581204B40A918F53642B8473D.ashx
SANDAG. 2021a. 2021 Regional Plan. December 2021. https://www.sandag.org/regional-plan/2021-regional- plan/-/media/8D0F181A086844E3A84C3D44576BED6B.ashx.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-18
SANDAG. 2021b. Appendix F: Regional Growth Forecast and Sustainable Communities Strategy Land Use Pattern. December 2021. https://www.sandag.org/-/media/SANDAG/Documents/PDF/regional- plan/2021-regional-plan/final-2021-regional-plan/2021-regional-plan-appendix-f-2021-12-01.pdf SANDAG 2021c. Appendix K: Regional Housing Needs Assessment Plan. December 2021. https://www.sandag.org/-/media/SANDAG/Documents/PDF/regional-plan/2021-regional-plan/ final-2021-regional-plan/2021-regional-plan-appendix-k-2021-05-01.pdf.

U.S. Census Bureau. 2021. American Community Survey: S2403: Industry by Sex for the Civilian Employed Population 16 Years and Over. https://data.census.gov/table?t=Employment:Industry& g=160XX00US0613392.

Section 5.13 Public Services
City of Chula Vista. 2005a. City of Chula Vista General Plan. Adopted December 13, 2005; amended March 7, 2020.

Accessed March 6, 2023. https://www.chulavistaca.gov/home/showdocument?id=9337.

City of Chula Vista. 2005b. “Public Facilities Development Impact Fee.” Approved December 2005. Accessed March 7, 2023. https://www.chulavistaca.gov/home/showdocument?id=16189.

City of Chula Vista. 2011. Chula Vista Public Library (CVPL) Strategic Facilities Plan. Approved April 2011.

Accessed March 8, 2023. https://www.chulavistaca.gov/home/showdocument?id=4812 City of Chula Vista. 2014. Chula Vista Public Library (CVPL) Strategic Vision Plan. Approved February 20, 2014.

Accessed March 8, 2023. https://www.chulavistaca.gov/home/showdocument?id=11716.

City of Chula Vista. 2020. “Calls for Service.” https://www.chulavistaca.gov/departments/police-department/ services/crime-and-community-safety
City of Chula Vista. 2021. City of Chula Vista Growth Management Oversight Commission – Annual Report for Fiscal Year 2020 (July 1, 2018–June 20, 2019). Approved January 28, 2021. Accessed March 8, 2023. https://pub-chulavista.escribemeetings.com/filestream.ashx?documentid=6786.

City of Chula Vista. 2023a. About Us – Fire Department webpage. Accessed March 6, 2023. https://www.chulavistaca.gov/departments/fire-department/about-us.

City of Chula Vista. 2023b. Fire Stations and Locations webpage. Accessed March 6, 2023. https://www.chulavistaca.gov/departments/fire-department/stations-locations/fire-stations-map.

CVESD (Chula Vista Elementary School District). 2020. Chula Vista Elementary School District Fee Justification Report for Residential & Commercial/Industrial Development. Escondido: CVESD, Special District Financing & Administration. May 2020. https://cdnsm5-ss12.sharpschool.com/UserFiles/Servers/ Server_411950/File/District/Departments/DeveloperFeeJustificationStudyMay2020.pdf.

Ed-data (Education Data Partnership). 2023a. “Chula Vista Elementary.” Fiscal, Demographic, and Performance Data on California’s K-12 Schools. California Department of Education, EdSource, and the Fiscal Crisis and Management Assistance Team/California School Information Services. 11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-19
Ed-data. 2023b. “Sweetwater Union High.” Fiscal, Demographic, and Performance Data on California’s K-12 Schools. California Department of Education, EdSource, and the Fiscal Crisis and Management Assistance Team/California School Information Services.

SUHSD (Sweetwater Union High School District). 2020. Sweetwater Union High School District Fee Justification Report for New Residential and Commercial/Industrial Development. March 18, 2022. SUHSD, Facilities and Planning Development, Special District Financing & Administration.

UDC (Unified Disaster Council of San Diego County). 2014. “Law Enforcement Mutual Aid Operations.” Annex C in Unified San Diego County Emergency Services Organization and County of San Diego Operational Area Emergency Operations Plan. September 2014.

Section 5.14 Recreation
City of Chula Vista 2003a. City of Chula Vista Greenbelt Master Plan. Adopted September 16, 2003. Accessed September 16, 2020. https://www.chulavistaca.gov/home/showdocument?id=212.

City of Chula Vista 2003b. City of Chula Vista Greenbelt Maintenance Map. Adopted September 16, 2003.

Accessed September 16, 2020. https://www.chulavistaca.gov/home/showdocument?id=234.

City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended March 17, 2020.

Accessed September 16, 2020. https://www.chulavistaca.gov/home/showdocument?id=9341.

City of Chula Vista. 2018. City of Chula Vista Parks and Recreation Master Plan. Adopted August 7, 2018.

Accessed September 18, 2020. https://www.chulavistaca.gov/home/showdocument?id=18294.

City of Chula Vista. 2020a. City of Chula Vista Active Transportation Plan (ATP). Approved May 12, 2020. Accessed September 18, 2020. https://www.chulavistaca.gov/home/showdocument?id=20838.

City of Chula Vista. 2020b. Growth Management Oversight Commission: Annual Report for Fiscal Year 2019.

January 30, 2020.

County of San Diego 2020. County of San Diego Parks and Recreation – Otay Lakes County Park webpage. Accessed September 29, 2020. https://www.sdparks.org/content/sdparks/en/park-pages/OtayLakes.html.

Section 5.15 Transportation
CAL FIRE (California Department of Forestry and Fire Protection). 2022. San Diego County State Responsibility Area Fire Hazard Severity Zones. November 21, 2022. https://osfm.fire.ca.gov/media/psdeiqck/ fhsz_county_sra_e_2022_sandiego_ada.pdf.

Caltrans (California Department of Transportation). 2020. Transportation Impact Study Guide. Vehicles Miles Traveled-Focused Draft. May 2020.

City of Chula Vista. 2001. Chula Vista Municipal Code (CVMC). 2001; Reprinted 2022. Accessed August 2024. https://chulavista.municipal.codes/CVMC.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-20
City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended July 13, 2021. https://www.chulavistaca.gov/departments/development-services/planning/planning-digital-library/ general-plan.

City of Chula Vista. 2012. Chula Vista Bayfront Local Coastal Program Land Use Plan. Adopted September 25, 2012. Amended December 5, 2017. https://www.chulavistaca.gov/home/showdocument?id=8421.

City of Chula Vista. 2020a. Transportation Study Guidelines. June 10, 2020; Revised January 2022. Accessed August 2024. https://www.chulavistaca.gov/home/showpublisheddocument/24299/ 637847624897770000.

City of Chula Vista. 2020b. Active Transportation Plan. Resolution No. 2020-099. Approved May 12, 2020.

Accessed August 2024. https://www.chulavistaca.gov/home/showpublisheddocument/20838/ 637346375732130000.

ITE (Institute of Transportation Engineers). 2021. Trip Generation Manual. 11th Edition.

OPR (Governor’s Office of Planning and Research). 2018. Technical Advisory on Evaluating Transportation Impacts in CEQA. December 2018. Accessed October 2023. http://opr.ca.gov/docs/20190122- 743_Technical_Advisory.pdf.

SANDAG (San Diego Association of Governments) 2002. “(Not So) Brief Guide of Vehicular Traffic Generation Rates for the San Diego Region.” April 2002. Accessed August 2024. https://www.sandiegocounty.gov/ content/dam/sdc/pds/ceqa/LehmanTPM/38%20Appendix%20T9_SANDAG%20Trip%20Generation% 20Rates.pdf.

SANDAG. 2021a. 2022 State Transportation Improvement Program. Submitted to the California Transportation Commission December 15, 2021. Accessed August 2024. https://www.sandag.org/-/media/ SANDAG/Documents/PDF/funding/funding-and-programming/state-transportation-improvement/ 2022-statetransportation-improvement-program-2021-12-15.pdf.

SANDAG. 2021b. 2021 Regional Plan. December 2021. Accessed August 2024. https://www.sandag.org/ regional-plan/2021-regional-plan/-/media/8D0F181A086844E3A84C3D44576BED6B.ashx.

SANDAG. 2021c. Appendix M: Progress on Near-Term and Continuing Actions from San Diego Forward: The 2015 Regional Plan and the 2019 Federal Regional Transportation Plan. December 2021. Accessed August 2024. https://www.sandag.org/-/media/SANDAG/Documents/PDF/regional-plan/2021-regional-plan/ final-2021-regional-plan/2021-regional-plan-appendix-m-2021-05-01.pdf.

SANDAG. 2022. 2023 Regional Transportation Improvement Program, FY 2023–2027. September 23, 2022.

Accessed August 2024. https://www.sandag.org/-/media/SANDAG/Documents/PDF/funding/funding- and-programming/regional-transportation-improvement-program/final-2023-rtip-2022-11-30.pdf.

SCAQMD (South Coast Air Quality Management District). 2014. Warehouse Truck Trip Study Data Results and Usage. Inland Empire Logistics Council. June 2014. Accessed August 2024. https://www.aqmd.gov/ docs/default-source/ceqa/handbook/high-cube-warehouse-trip-rate-study-for-air-quality-analysis/ final-ielc_6-19-2014.pdf?sfvrsn=2.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-21
Section 5.16 Utilities and Service Systems
CALGreen (California Green Building Code). 2019. 2019 California Green Building Standards Code, Title 24, Part 11 with Jan 2020 Errata. Accessed September 16, 2020. https://codes.iccsafe.org/content/CGBC2019P3.

CalRecycle (California Department of Resources Recycling and Recovery). 2024a. “SWIS Facility/Site Activity Details, Otay Landfill (37-AA-0010).” Accessed August 2024. https://www2.calrecycle.ca.gov/ SolidWaste/SiteActivity/Details/1790?siteID=2863.

CalRecycle. 2024b. “SWIS Facility/Site Activity Details, Sycamore Landfill (37-AA-0023).” Accessed August 2024. https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/1798?siteID=2871.

CEC (California Energy Commission). 2023. “California Energy Demand Forecast, 2022–2035 Baseline Forecast.” January 2023. Accessed August 2024. https://efiling.energy.ca.gov/GetDocument.aspx?tn=248378.

City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended March 17, 2020.

Accessed October 1, 2020. https://www.chulavistaca.gov/home/showdocument?id=9337.

City of Chula Vista. 2012. A Supplemental Environmental Impact Report for Amendments to the City of Chula Vista General Plan (GPA-09-01) and Otay Ranch General Development Plan (PCM-09-11). Approved June 2012. Accessed October 1, 2020. https://www.chulavistaca.gov/home/showdocument?id=11414.

City of Chula Vista. 2014. City of Chula Vista Wastewater Master Plan. Approved 2014. Accessed October 1, 2020. https://www.chulavistaca.gov/departments/public-works/master-plans/wastewater-master-plan.

City of Chula Vista. 2022. Recycling and Solid Waste Planning Manual. Revised January 2022. Accessed August 2024. https://www.chulavistaca.gov/home/showpublisheddocument/14105/637752624411130000.

EPA (U.S. Environmental Protection Agency). 1997. “RecycleMania, Volume-to-Weight Conversion Chart.” Accessed August 2024. https://archive.epa.gov/wastes/conserve/tools/rogo/web/pdf/ volume-weight-conversions.pdf.

MWD (Metropolitan Water District). 2021. 2020l Urban Water Management Plan. June 2021. Accessed August 2024. https://www.mwdh2o.com/media/21641/2020-urban-water-management-plan-june-2021.pdf.

SDCWA (San Diego County Water Authority). 2021. 2020 Urban Water Management Plan. March 2021. Accessed August 2024. https://www.sdcwa.org/wp-content/uploads/2021/03/Draft-2020-UWMP.pdf.

SDG&E (San Diego Gas and Electric Company). 2024. “Our Company.” Accessed August 2024. https://www.sdge.com/more-information/our-company.

Sweetwater Authority. 2021a. 2020 Urban Water Management Plan. April 13, 2021. Accessed August 2024. https://www.sweetwater.org/DocumentCenter/View/2594/2020-Urban-Water-Management-Plan-PDF.

Sweetwater Authority. 2021b. Water Distribution System Master Plan. December 28, 2021. Accessed August 2024. https://www.sweetwater.org/DocumentCenter/View/2764/2020-Water-Distribution-System- Master-Plan-PDF.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-22
Section 5.17 Wildfire
CAL FIRE (California Department of Forestry and Fire Protection). 2009. Fire Hazard Severity Zones in Local Responsibility Areas. Riverside County City FHSZ Maps, Murrieta. http://www.fire.ca.gov/ fire_prevention/fhsz_maps/FHSZ/riverside/Murrieta.pdf.

CAL FIRE. 2018. 2018 Strategic Fire Plan for California. August 22, 2018.

City of Chula Vista. 1989. Sunbow General Development Plan. December 5, 1989. https://www.chulavistaca.gov/ departments/development-services/planning/planning-digital-library/spa-plan.

City of Chula Vista. 2003. City of Chula Vista MSCP Subarea Plan. February 2003. Accessed October 2020. https://www.chulavistaca.gov/home/showdocument?id=7106.

City of Chula Vista. 2005. City of Chula Vista General Plan. Adopted December 13, 2005; amended March 17, 2020. https://www.chulavistaca.gov/departments/development-services/planning/ planning-digital-library/general-plan.

City of Chula Vista Municipal Code. 2020. Chula Vista Municipal Code, Chapter 15.36 Fire Code. Current through July 28, 2020. Accessed September 2020. https://chulavista.municipal.codes/CVMC/15.36.

County of San Diego. 2017. Multi-Jurisdictional Hazard Mitigation Plan. Accessed September 2020. https://www.sandiegocounty.gov/content/dam/sdc/oes/emergency_management/HazMit/2018/ 2018%20Hazard%20Mitigation%20Plan.pdf.

County of San Diego. 2018. San Diego County Emergency Operations Plan. Accessed September 2020. https://www.sandiegocounty.gov/content/sdc/oes/emergency_management/oes_jl_oparea.html.

DOI (U.S. Department of the Interior) and USDA (U.S. Department of Agriculture). 2000. “Managing the Impact of Wildfires on Communities and the Environment.” September 8, 2000.

FEMA (Federal Emergency Management Agency). 2020. “FEMA Flood Map Service Center,” FIRM panel 06071C6490H. Effective August 28, 2008. Accessed September, 2020. https://msc.fema.gov/ portal/search?AddressQuery=chulavista%20#searchresultsanchor.

International Fire Chiefs Association. 2013. Ready Set Go – My Personal Wildland Fire Action Guide. Accessed November 2, 2020. https://www.wildlandfirersg.org/s/iafc2/iafc-wildland-fire-programs-20Y3 m0000004EhqEAE?language=en_US
ICC (International Code Council). 2014. 2015 International Wildland–Urban Interface Code. May 30, 2014. https://codes.iccsafe.org/content/document/556?site_type=public.

ICC. 2017. 2018 International Fire Code. August 31, 2017. https://codes.iccsafe.org/content/ IFC2018?site_type=public.

International Fire Chiefs Association. 2013.

National Wildfire Coordinating Group. 2009. Guidance for Implementation of Federal Wildland Fire Management Policy. February 13, 2009.
11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-23
Chapter 6 Cumulative Impacts
No references cited in this chapter.

Chapter 7 Growth Inducement
City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan.

Chapter 8 Significant Irreversible Changes
No references cited in this chapter.

Chapter 9 Effects Found Not to Be Significant
CAL FIRE (California Department of Forestry and Fire Protection). 2022. San Diego County State Responsibility Area Fire Hazard Severity Zones. November 21, 2022. https://osfm.fire.ca.gov/media/psdeiqck/ fhsz_county_sra_e_2022_sandiego_ada.pdf.

City of Chula Vista. 2005. Chula Vista General Plan: Vision 2020. As amended. Adopted December 13, 2005; Amended July 13, 2021 (Resolution 2021-137). https://www.chulavistaca.gov/departments/ development-services/planning/planning-digital-library/general-plan.

DOC (California Department of Conservation). 2017. Updated Mineral Land Classification for Portland Cement Concrete-Grade Aggregate in the Western San Diego County Production-Consumption Region, California. 2017. https://www.conservation.ca.gov/cgs/Documents/SR_240_WSD_2017_Plate1.pdf DOC. 2018. California Important Farmland Finder. Accessed March 17, 2023. https://maps.conservation.ca.gov/ DLRP/CIFF/App/index.html?marker=-117.095215376033%2C32.629403498243086%2C% 2C%2C%2C&markertemplate=%7B%22title%22%3A%22%22%2C%22longitude%22% 3A-117.095215376033%2C%22latitude%22%3A32.629403498243086%2C%22isIncludeShareUrl% 22%3Atrue%7D&level=16.

Chapter 10 Alternatives
No references cited in this chapter.

11– REFERENCES
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 11-24

INTENTIONALLY LEFT BLANK
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 12-1
12 List of Preparers

12.1 Lead Agency Representatives
Todd Philips, Planning Manager, City of Chula Vista
Arturo Ortuno, Senior Planner, City of Chula Vista
Desmond Corley, Principal Planner, City of Chula Vista

12.2 Dudek – EIR Preparers
Carey Fernandes, Principal
Alexandra Martini, Project Manager
Perry Russel, Environmental Planner
Sabita Tewani, Traffic Engineer
Elena Nuno, Air Quality Specialist
Michael Williams, PhD, Archaeologist
Jim Cowan, INCE Bd. Cert., Senior Technical Specialist
Andrew Gries, Mapping/Surveying Analyst
Laurel Porter, ELS, Senior Technical Editor
Lia Kershaw, Technical Editor
Laura Reed, Formatting Specialist

12.3 Subconsultants – EIR Contributors
City Thinkers, Diego Velasco
Mizuta Traffic Consulting, Marc Mizuta
ClayCo., Stephanie Saathoff
Rocks Biological Consulting
GeoCon Incorporated
Dexter Wilson Engineering
Partner Engineering and Science Inc.
12 – LIST OF PREPARERS
ROHR WOHL SPECIFIC PLAN EIR 14541
JULY 2025 12-2

INTENTIONALLY LEFT BLANK

← All documents from this meeting