Line 1
Percent (%) Value ($)
Line 2 8.12% 1,493,263.91$
Line 3 16,906,736.09$
Line 4 1.83% 310,078.21$
Line 5 5.81% 982,912.00$
Line 6 3.50% 591,735.76$
Line 7 1.10% 185,974.10$
Line 8 0.90% 152,160.62$
Line 9 20.20% 3,716,124.60$
Line 10 13,190,611.49$
Name of DBE:BNB | CJ+C
Name of Authorized Signatory: James Awford
Signed:James Awford Date: 11/4/2025
Construction Phase Design Services - Percent of GMP Budget** =% of Line 3 (to be incorporated into GMP proposal)
Estimated Base GMP (Construction Cost, DBE Contingency, DBE Allowances, and City Allowances) =Line 3 - Line 9
**** Actual fees will vary as percentages dependent of GMP Budget
FEE PROPOSAL FORM PROGRESSIVE DESIGN-BUILD SERVICES
FOR
RENOVATIONS OF THE CITY OF CHULA VISTA’S CIVIC CENTER AND SOUTH LIBRARY
BRANCHES
CIP#: GGV0271 AND GGV0272
Project Budget * 18,400,000.00 $
Preconstruction Fee - Lump Sum*
GMP Budget
=Line 1 - Line 2
* Ref: Contract section 5.1, Should the City choose to increase the project budget per section 2.4 of the RFQ&P an increase in the Preconstruction Fee shall be negotiated between the DBE and the City** Ref: Contract section 5.4 *** Ref: Contract section 5.5
Total Fee ****
=Sum of Lines 2, 4, 5, 6, 7 & 8
DBE’s General Requirements - Percent of GMP Budget***
=% of Line 3
Overhead and Profit - Percent of GMP Budget***
=% of Line 3
Insurance - Percent of GMP Budget***
=% of Line 3, fee exclusive of Builder’s Risk “All Risk” Bonds - Percent of GMP Budget***
=% of Line 3