Cities Index.
Attachment 1 - Bayshore Bikeway Between Lagoon Drive and H Street.pdf

Chula Vista City Council
July 28, 2026

Document
Attachment 1 - Bayshore Bikeway Between Lagoon Drive and H Street.pdf
Meeting
July 28, 2026
Body
Chula Vista City Council
Original file
3.2 MB
Text extracted from the city's file for reading and search. Open the original on pub-chulavista.escribemeetings.com. That file is the official record.

X X X X X X X X X X X X X X X X X X X X XXX X

XXXXXXXXXXXXXXXXXXXXX

LAGOON DRIVEG STREET

H STREETF STBAY BOULEVARD BAY BOULEVARD

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Q:\_Projects\STM0369 - ADV Planning (Signing-Striping)\Bayshore Bikeway\CAD\STM0369_6B Exhibit.dwg Plot: Yan Liu Date: 9/29/2022 2:06:47 PM

SEE DETAIL BELOW SEE DETAIL BELOW
CONSTRUCT CLASS 1SHARED USE PATH

CITY OF CHULA VISTA R/W

CITY OF CHULA VISTA R/W

SD&AERAIL R/W

REMOVE OR BURY EXISTING INACTIVE RAIL
CONSTRUCT CLASS 1SHARED USE PATHSEE DETAIL BELOWPROTECTIN PLACEEXISTING INACTIVE RAIL LAGOON DRIVE TO G STREET =14MILE G STREET TO H STREET =14MILE AABB
XX
X
XXX
XXXX
X X X
X X X
X

X X X X X X
XXXXXX
2'5'5'2' ±27'14' CLASS 1 SHARED USE PATH± 40' SD&AE R/WPROTECT IN PLACEEXISTING INACTIVE RAIL8.5' MIN FROM CL OF RAILPROPOSED FENCINGPROPOSED FENCING±260-360' TO BAY BOULEVARD

PROPOSED SECTION B-B (LAGOON DR TO G ST)NOT TO SCALE
2'5'5'2'14' CLASS 1 SHARED USE PATH± 40' SD&AE R/W

REMOVE OR BURYEXISTING INACTIVE RAIL

4.7' - 6.8'7.5' - 13'EXISTINGUNNAMED ROADEXISTINGPARKING LOT

PROPOSED FENCINGPROPOSED FENCING

ACCESS TO EXISTINGWAREHOUSE BUILDINGS

PROPOSED SECTION A-A (NORTH OF H STREET)NOT TO SCALE
NORTH0GRAPHIC SCALE IN FEET
100
50100200
Bayshore Bikeway - Chula Vista SegmentProposed Project Plan and Cross Sectionc:\users\brigid.ahern\kh\2024 grant applications - documents\atp cycle 8\chula vista - bayshore bikeway phase 6b\design\plan sheets\chula vista - bayshore bikeway.dwg 6/11/2026 PROPOSED H ST BIKE PATH CROSSINGSCALE 1"=20'
PROPOSED G ST BIKE PATH CROSSINGSCALE 1"=20'
LAGOON DR BIKE PATH CROSSING(TO BE CONSTRUCTED WITH SEGMENT 6A)SCALE 1"=20'

CONSTRUCT HAWK TRAFFIC SIGNAL(INCLUDING FOUNDATION, POLE, MASTARMS, SIGNALS, LUMINAIRE)CONSTRUCT PED XINGCONSTRUCT PEDESTRIAN RAMP

CONSTRUCT HAWK TRAFFIC SIGNAL(INCLUDING FOUNDATION, POLE, MASTARMS, SIGNALS, LUMINAIRE)CONSTRUCT BIKE HAWK XING ADA IMPROVEMENTS FORPEDESTRIAN RAMPCONNECT TO EXISTINGCLASS 1 BIKE PATH

CONSTRUCT PED XINGCONSTRUCT PEDESTRIAN RAMP(INCLUDING YIELD SIGNING &STRIPING)

CONSTRUCT PEDESTRIAN RAMP(INCLUDING YIELD SIGNING &STRIPING)

BIKE HAWK XING

CONSTRUCT PEDESTRIAN RAMP

CONSTRUCT HAWK TRAFFIC SIGNAL(INCLUDING FOUNDATION, POLE, MASTARMS, SIGNALS, LUMINAIRE)

CONSTRUCT HAWK TRAFFIC SIGNAL(INCLUDING FOUNDATION, POLE, MASTARMS, SIGNALS, LUMINAIRE) BAYSHORE BIKEWAYSEGMENT 6B (PROPOSED)
SEGEMENT 6A'SPEDESTRIAN RAMPBAYSHORE BIKEWAYSEGMENT 6A CONNECTION

PEDESTRIAN XING
5/22/2026SHEET 1 OF 1
SEGEMENT 6A'SPEDESTRIAN RAMP
FURNISH & INSTALL PEDESTRIAN SCALE LIGHTING & ELECTRICAL: CONDUIT, WIRING, VANDAL-PROOF PULLBOXES, METER PEDESTAL, & SERVICE CONNECTION

UPGRADE DRIVEWAY APRON

← All documents from this meeting