LAGOON DRIVEG STREET
H STREETF STBAY BOULEVARD BAY BOULEVARD
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Q:\_Projects\STM0369 - ADV Planning (Signing-Striping)\Bayshore Bikeway\CAD\STM0369_6B Exhibit.dwg Plot: Yan Liu Date: 9/29/2022 2:06:47 PM
SEE DETAIL BELOW SEE DETAIL BELOW
CONSTRUCT CLASS 1SHARED USE PATH
CITY OF CHULA VISTA R/W
CITY OF CHULA VISTA R/W
SD&AERAIL R/W
REMOVE OR BURY EXISTING INACTIVE RAIL
CONSTRUCT CLASS 1SHARED USE PATHSEE DETAIL BELOWPROTECTIN PLACEEXISTING INACTIVE RAIL LAGOON DRIVE TO G STREET =14MILE G STREET TO H STREET =14MILE AABB
XX
X
XXX
XXXX
X X X
X X X
X
X X X X X X
XXXXXX
2'5'5'2' ±27'14' CLASS 1 SHARED USE PATH± 40' SD&AE R/WPROTECT IN PLACEEXISTING INACTIVE RAIL8.5' MIN FROM CL OF RAILPROPOSED FENCINGPROPOSED FENCING±260-360' TO BAY BOULEVARD
PROPOSED SECTION B-B (LAGOON DR TO G ST)NOT TO SCALE
2'5'5'2'14' CLASS 1 SHARED USE PATH± 40' SD&AE R/W
REMOVE OR BURYEXISTING INACTIVE RAIL
4.7' - 6.8'7.5' - 13'EXISTINGUNNAMED ROADEXISTINGPARKING LOT
PROPOSED FENCINGPROPOSED FENCING
ACCESS TO EXISTINGWAREHOUSE BUILDINGS
PROPOSED SECTION A-A (NORTH OF H STREET)NOT TO SCALE
NORTH0GRAPHIC SCALE IN FEET
100
50100200
Bayshore Bikeway - Chula Vista SegmentProposed Project Plan and Cross Sectionc:\users\brigid.ahern\kh\2024 grant applications - documents\atp cycle 8\chula vista - bayshore bikeway phase 6b\design\plan sheets\chula vista - bayshore bikeway.dwg 6/11/2026 PROPOSED H ST BIKE PATH CROSSINGSCALE 1"=20'
PROPOSED G ST BIKE PATH CROSSINGSCALE 1"=20'
LAGOON DR BIKE PATH CROSSING(TO BE CONSTRUCTED WITH SEGMENT 6A)SCALE 1"=20'
CONSTRUCT HAWK TRAFFIC SIGNAL(INCLUDING FOUNDATION, POLE, MASTARMS, SIGNALS, LUMINAIRE)CONSTRUCT PED XINGCONSTRUCT PEDESTRIAN RAMP
CONSTRUCT HAWK TRAFFIC SIGNAL(INCLUDING FOUNDATION, POLE, MASTARMS, SIGNALS, LUMINAIRE)CONSTRUCT BIKE HAWK XING ADA IMPROVEMENTS FORPEDESTRIAN RAMPCONNECT TO EXISTINGCLASS 1 BIKE PATH
CONSTRUCT PED XINGCONSTRUCT PEDESTRIAN RAMP(INCLUDING YIELD SIGNING &STRIPING)
CONSTRUCT PEDESTRIAN RAMP(INCLUDING YIELD SIGNING &STRIPING)
BIKE HAWK XING
CONSTRUCT PEDESTRIAN RAMP
CONSTRUCT HAWK TRAFFIC SIGNAL(INCLUDING FOUNDATION, POLE, MASTARMS, SIGNALS, LUMINAIRE)
CONSTRUCT HAWK TRAFFIC SIGNAL(INCLUDING FOUNDATION, POLE, MASTARMS, SIGNALS, LUMINAIRE) BAYSHORE BIKEWAYSEGMENT 6B (PROPOSED)
SEGEMENT 6A'SPEDESTRIAN RAMPBAYSHORE BIKEWAYSEGMENT 6A CONNECTION
PEDESTRIAN XING
5/22/2026SHEET 1 OF 1
SEGEMENT 6A'SPEDESTRIAN RAMP
FURNISH & INSTALL PEDESTRIAN SCALE LIGHTING & ELECTRICAL: CONDUIT, WIRING, VANDAL-PROOF PULLBOXES, METER PEDESTAL, & SERVICE CONNECTION
UPGRADE DRIVEWAY APRON