CITY COUNCIL REGULAR MEETING AGENDA
MARCH 12, 2026
CITY COUNCIL
REGULAR MEETING
AGENDA
MARCH 12, 2026 AT 9:00 AM
MAYOR CORY MOSS
MAYOR PRO TEM MICHAEL GREUBEL
COUNCIL MEMBER STEVE MARCUCCI
COUNCIL MEMBER MARK D. RADECKI
COUNCIL MEMBER NEWELL RUGGLES
LOCATION: City Council Chambers, 15651 Mayor Dave Way, City of Industry, California ADDRESSING THE CITY COUNCIL:
Agenda Items: Members of the public may address the City Council on any matter listed on the Agenda. In order to conduct a timely meeting, there will be a one-minute time limit per person for any matter listed on the Agenda. Anyone wishing to speak to the City Council is asked to complete a Speaker’s Card which can be found at the back of the room and at the podium. The completed card should be submitted to the City Clerk prior to the Agenda item being called and prior to the individual being heard by the City Council.
Public Comments (Non-Agenda Items):Anyone wishing to address the City Council on an item not on the Agenda may do so during the “Public Comments” period. In order to conduct a timely meeting, there will be a one-minute time limit per person for the Public Comments portion of the Agenda. State law prohibits the City Council from taking action on a specific item unless it appears on the posted Agenda. Anyone wishing to speak to the City Council is asked to complete a Speaker’s Card which can be found at the back of the room and at the podium. The completed card should be submitted to the City Clerk prior to the Agenda item being called by the City Clerk and prior to the individual being heard by the City Council.
At the time of publication, no Councilmembers intend to take part in the meeting remotely under the provisions of AB 2449. Should that change between the time of publication and the start of the meeting, a live webcasting of the meeting will be accessible via the link, meeting ID, and meeting passcode listed below. Whenever possible, an announcement will be made at the start of the meeting via the live webcast to confirm whether or not a Councilmember will join remotely. If they will not be joining remotely, then the live webcast will terminate after the announcement. www.microsoft.com/microsoft-teams/join-a-meeting
Meeting ID: 286 316 350 481 74
Meeting Passcode: T2Ut6SL6
Or call in (audio only)
+1 657-204-3264,
Phone Conference ID: 136 924 68#
AMERICANS WITH DISABILITIES ACT:
In compliance with the ADA, if you need special assistance to participate in any City meeting (including assisted listening devices), please contact the City Clerk’s Office (626) 333-2211.
Notification of at least 48 hours prior to the meeting will assist staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting.
AGENDAS AND OTHER WRITINGS:
In compliance with SB 343, staff reports and other public records permissible for disclosure related to open session agenda items are available at City Hall, 15625 Mayor Dave Way, City of Industry, California, at the office of the City Clerk during regular business hours, Monday through Thursday 8:00 a.m. to 5:00 p.m., Fridays 8:00 a.m. to 4:00 p.m. Any person with a question concerning any agenda item may call the City Clerk’s Office at (626) 333-2211.
CITY COUNCIL REGULAR MEETING AGENDA
MARCH 12, 2026
1. Call to Order
2. Flag Salute
3. AB 2449 Vote on Emergency Circumstances (if necessary)
4. Roll Call
5. Presentations-City Council & Employee Milestone Recognition
6. CONSENT CALENDAR
6.1. Consideration of the Register of Demands for March 12, 2026 RECOMMENDED ACTION:
Approve the Register of Demands and authorize the appropriate personnel to pay the bills.
6.2. Consideration of Award of Contract No. CITY-1501, Kella Avenue and Rooks Road Storm Drain and Pavement Rehabilitation to Voltaire Engineering, in an amount not to exceed $975,635.00, and adopt Notice of Exemption regarding same
RECOMMENDED ACTION: Award the contract to Voltaire
Engineering. in an amount not to exceed $975,635.00.
6.3. Consideration of Resolution No. CC 2026- 08- RESOLUTION OF THE CITY
COUNCIL OF THE CITY OF INDUSTRY, CALIFORNIA, AUTHORIZING THE DEDICATION OF A PORTION OF ASSESSOR’S PARCEL NUMBER 8564-007-901, AT THE NORTHWEST CORNER OF VALLEY BOULEVARD AND TEMPLE AVENUE IN THE CITY OF INDUSTRY, and adopting Notice of Exemption regarding same
RECOMMENDED ACTION: Adopt Resolution No. CC 2026-08 and adopt the Notice of Exemption
6.4. Consideration of a License Agreement with Johann-Ren Collantes for Access to 19001 Tonner Canyon Road, for temporary use for filming RECOMMENDED ACTION: Authorize the City Manager to approve the License Agreement in a form approved by the City Attorney
CITY COUNCIL REGULAR MEETING AGENDA
MARCH 12, 2026
7. ACTION ITEMS
7.1. Update on the La Puente Valley County Water District proposed office building and maintenance yard on Rausch Road
RECOMMENDED ACTION: Discuss and provide direction
8. PUBLIC HEARINGS - NONE
9. CLOSED SESSION
9.1. CONFERENCE WITH REAL PROPERTY NEGOTIATORS Pursuant to Government Code Section 54956.8:
Property: Assessor Parcel
Numbers: 306-021-01, 306-021-02, 306-021-13, 306-021-16, 306-021-17, 306-021-18, 306-021-19, 308-031-18, 308-031-24, 308-031-32, 8714-026- 270, 8714-026-271, 8714-026-272, 8714-026-273, 8714-026-274, 8714- 026-275, 8714-027-270, 8714-027-272, 8714-028-270, 8714-028-271, 8714-029-270 (generally known as Tonner Canyon)
Agency Negotiators: Joshua Nelson, City
Manager, James Casso, City Attorney,
Negotiating Parties: Johann-Ren Collantes
Under Negotiation: Price and terms of payment
9.2. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION Pursuant to Government Code Section 54956.9(d)(1)
Case: City of Industry v. San Gabriel Valley Water and Power, LLC, et al.
Los Angeles County Superior Court Case No. 19STCV10150
9.3. CONFERENCE WITH REAL PROPERTY NEGOTIATORS Pursuant to Government Code Section 54956.8:
Property: Two vacant lots on East Nelson Avenue, west of Maypop Avenue Assessor Parcel Numbers:8208-024-906 and
8208-024-907
Agency Negotiators: Joshua Nelson, City Manager, James Casso, City Attorney
Negotiating Parties: HKTSNTRLT LLC
Under Negotiation: Price and terms of payment
10. CITY MANAGER REPORTS
11. AB 1234 REPORTS
12. CITY COUNCIL COMMUNICATIONS
13. PUBLIC COMMENTS
CITY COUNCIL REGULAR MEETING AGENDA
MARCH 12, 2026
14. Adjournment. The next regular City Council Meeting is Thursday, March 26, 2026, at 9:00 AM.
ITEM NO. 6.1
ITEM NO. 6.2
MEMORANDUM
TO: Honorable Mayor and Members of the City Council
FROM: Joshua Nelson, City Manager
STAFF: Mathew Hudson, Director of Public Works
Arlene Lopez, Sr. Project Manager
James Cramsie, Sr. Director of Engineering
DATE: March 12, 2026
SUBJECT: Consideration of Award of Contract No. CITY-1501, Kella Avenue and Rooks Road Storm Drain and Pavement Rehabilitation to Voltaire Engineering, in an amount not to exceed $975,635.00, and adopt Notice of Exemption regarding same
Background:
On October 23, 2025, the City Council authorized solicitation of public bids for Kella Avenue and Rooks Road Storm Drain and Pavement Rehabilitation project for an estimated cost of $1,148,000.00. This project was bid to procure a contractor to provide asphalt concrete and Portland Cement removal, construction, and repair. Concrete sidewalk removal and reconstruction, trenching, storm drain and catch basin construction, traffic control, and signing and striping.
On November 25, 2025, the bid was posted in the City’s PlanetBids™ vendor portal and an email notification was sent to 724 vendors. The bid was viewed by 89 prospective bidders.
The appropriate trade journals were notified on November 25, 2025. The bid was advertised on December 1, 2025 and December 8, 2025 in the San Gabriel Valley Tribune. Questions pertaining to the bid were received up until January 2, 2026 at 5:00 p.m. in the City’s Planetbids™ vendor portal.
Discussion:
The bid process closed on January 22, 2026. Fourteen (14) bids were received. The review of bids has found that Voltaire Engineering, has submitted the lowest responsive bid and has the relevant experience, qualifications, and licensing necessary to complete this project. Below is a table of all bidders and their prices, showing that Voltaire Engineering is the lowest responsive
bidder.
Bidder Bid Price
Voltaire Engineering $975,635.00
Towo Enterprises, Inc. $1,020,835.00
Gentry General Engineering, Inc. $1,035,847.40
Gentry Brothers, Inc. $1,087,800.00
Van Engineering, Inc. $1,127,060.00
Hardy & Harper, Inc. $1,275,000.00
ONYX Paving Company, Inc. $1,308,000.00
Toro Enterprises, Inc. $1,438,838.75
Sequel Contractors, Inc. $1,445,300.00
Sully-Miller Contracting Company $1,454,020.00
All American Asphalt $1,658,220.00
CEM Construction Corporation $1,783,825.00
PALP dba Excel Paving Company $1,987,755.00
Crosby Plumbing, Inc. $2,287,483.35
Staff has determined that this project is subject to review under the California Environmental Quality Act (“CEQA”), however, it falls within the Categorical Exemption, Section 15301 Class 1, minor alteration of existing public facilities. As set forth above, the project involves asphalt concrete and portland concrete cement removal, construction, and repair. Concrete sidewalk removal and reconstruction, trenching, storm drain and catch basin construction and signing and striping., and pursuant to Section 15301 of the CEQA Regulations, the repair, maintenance, or minor alteration of existing City streets is exempt, as long as there is no expansion (or only negligible expansion) of the use. Here, Staff is proposing to complete maintenance on existing streets and storm drain construction, the project does not result in an expansion of the use, as the streets are not being expanded to allow for additional traffic, it’s simply routine maintenance work.
Fiscal Impact:
The fiscal impact is $975,635.00. In the adopted Fiscal Year 2025-2026 Capital Improvement Project budget, $1,000,000.00 is approved for this project (Account No. 120-703-5205, CIP-SD19-041-B/MP 12-07 #4).
Recommendation:
1. Staff recommends that the City Council consider the results of the Kella Avenue and Rooks Road Storm Drain and Pavement Rehabilitation bid and award the bid to Voltaire Engineering; and
2. Authorize the City Manager to approve change orders up to ten percent of the contract amount; and
3. Staff recommends that the Council adopt the Notice to Exemption for this project Exhibits:
1. Bid Results
2. Bid Schedule Packet (Bid Bond and Pages C-4R through C-15)
3. Contractor’s State of California and Department of Industrial relations License Detail
4. Notice of Exemption
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
Voltaire
Engineering - Unit
Price
Voltaire
Engineering - Line
Total
1 Mobilization LS 1 $30,000.00 $30,000.00
2 Traffic Control LS 1 $30,000.00 $30,000.00
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 $3,795.00 $3,795.00 4 Sawcut and Remove Existing AC Pavement SF 20500 $2.00 $41,000.00 5 Repair Up To 25% Underlying PCC Pavement SF 5110 $5.50 $28,105.00 6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 $10.00 $51,100.00 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 $2.00 $39,800.00 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 $30.00 $22,350.00 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 $5.00 $3,600.00 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 $5.00 $4,700.00 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 $10.00 $950.00 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 $3,000.00 $15,000.00 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 $1,300.00 $1,300.00 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 $400.00 $1,200.00 15 Modify Existing Irrigation Facilities LS 1 $3,250.00 $3,250.00 16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2 $1,500.00 $3,000.00
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 $200.00 $158,000.00
Item No Description
Unit of
Measure Qty
Voltaire
Engineering - Unit
Price
Voltaire
Engineering - Line
Total
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 $210.00 $203,700.00 19 Construct Crushed Aggregate Base CY 190 $170.00 $32,300.00 20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 $55.00 $40,975.00 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 $20.00 $14,400.00 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 $5,500.00 $5,500.00 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 $25.00 $23,500.00 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 $75.00 $7,125.00 25 Pavement Markers, Markings and Traffic Striping LS 1 $33,075.00 $33,075.00 26 Install Traffic Signal Loop Detector LF 260 $20.00 $5,200.00 27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 $400.00 $800.00 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 $65.00 $33,475.00 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 $12,000.00 $12,000.00 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 $179.00 $83,235.00 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 $5,000.00 $5,000.00 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 $7,000.00 $21,000.00 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 $160.00 $11,200.00 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 $6,000.00 $6,000.00 Subtotal $975,635.00
Total $975,635.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 Towo Enterprise
Inc - Unit Price
Towo Enterprise Inc -
Line Total
$35,000.00 $35,000.00
$25,000.00 $25,000.00
$10,000.00 $10,000.00
$2.50 $51,250.00
$5.00 $25,550.00
$6.00 $30,660.00
$7.00 $139,300.00
$8.00 $5,960.00
$3.00 $2,160.00
$4.00 $3,760.00
$5.00 $475.00
$2,500.00 $12,500.00
$1,500.00 $1,500.00
$1,800.00 $5,400.00
$5,000.00 $5,000.00
$15,000.00 $30,000.00
$150.00 $118,500.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 Towo Enterprise
Inc - Unit Price
Towo Enterprise Inc -
Line Total
$165.00 $160,050.00
$120.00 $22,800.00
$75.00 $55,875.00
$11.00 $7,920.00
$7,000.00 $7,000.00
$22.00 $20,680.00
$55.00 $5,225.00
$20,000.00 $20,000.00
$22.00 $5,720.00
$1,200.00 $2,400.00
$80.00 $41,200.00
$15,000.00 $15,000.00
$190.00 $88,350.00
$10,000.00 $10,000.00
$12,000.00 $36,000.00
$80.00 $5,600.00
$15,000.00 $15,000.00
$1,020,835.00
$1,020,835.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 Gentry General
Engineering, Inc. -
Unit Price
Gentry General
Engineering, Inc. - Line
Total
$46,200.00 $46,200.00
$11,760.00 $11,760.00
$17,146.00 $17,146.00
$3.00 $61,500.00
$3.34 $17,067.40
$17.00 $86,870.00
$3.00 $59,700.00
$72.00 $53,640.00
$16.00 $11,520.00
$7.00 $6,580.00
$62.00 $5,890.00
$624.00 $3,120.00
$1,560.00 $1,560.00
$910.00 $2,730.00
$17,318.00 $17,318.00
$2,411.00 $4,822.00
$165.00 $130,350.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 Gentry General
Engineering, Inc. -
Unit Price
Gentry General
Engineering, Inc. - Line
Total
$159.00 $154,230.00
$140.00 $26,600.00
$62.00 $46,190.00
$16.00 $11,520.00
$8,751.00 $8,751.00
$27.00 $25,380.00
$88.00 $8,360.00
$6,556.00 $6,556.00
$20.00 $5,200.00
$1,364.00 $2,728.00
$92.00 $47,380.00
$9,535.00 $9,535.00
$200.00 $93,000.00
$9,535.00 $9,535.00
$9,405.00 $28,215.00
$174.00 $12,180.00
$2,714.00 $2,714.00
$1,035,847.40
$1,035,847.40
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 Gentry Brothers,
Inc. - Unit Price
Gentry Brothers, Inc. -
Line Total
$50,000.00 $50,000.00
$20,000.00 $20,000.00
$5,000.00 $5,000.00
$4.00 $82,000.00
$20.00 $102,200.00
$28.00 $143,080.00
$4.50 $89,550.00
$35.00 $26,075.00
$3.00 $2,160.00
$3.00 $2,820.00
$12.00 $1,140.00
$800.00 $4,000.00
$250.00 $250.00
$175.00 $525.00
$10,000.00 $10,000.00
$3,250.00 $6,500.00
$100.00 $79,000.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 Gentry Brothers,
Inc. - Unit Price
Gentry Brothers, Inc. -
Line Total
$100.00 $97,000.00
$65.00 $12,350.00
$45.00 $33,525.00
$7.00 $5,040.00
$1,800.00 $1,800.00
$9.00 $8,460.00
$35.00 $3,325.00
$50,000.00 $50,000.00
$20.00 $5,200.00
$450.00 $900.00
$150.00 $77,250.00
$15,000.00 $15,000.00
$240.00 $111,600.00
$4,000.00 $4,000.00
$10,000.00 $30,000.00
$65.00 $4,550.00
$3,500.00 $3,500.00
$1,087,800.00
$1,087,800.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 Van Engineering inc -
Unit Price
Van Engineering inc -
Line Total
$50,000.00 $50,000.00
$40,000.00 $40,000.00
$10,000.00 $10,000.00
$1.00 $20,500.00
$12.00 $61,320.00
$20.00 $102,200.00
$1.50 $29,850.00
$6.00 $4,470.00
$3.00 $2,160.00
$5.00 $4,700.00
$15.00 $1,425.00
$2,300.00 $11,500.00
$1,800.00 $1,800.00
$450.00 $1,350.00
$5,000.00 $5,000.00
$5,000.00 $10,000.00
$200.00 $158,000.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 Van Engineering inc -
Unit Price
Van Engineering inc -
Line Total
$206.00 $199,820.00
$100.00 $19,000.00
$40.00 $29,800.00
$6.00 $4,320.00
$1,200.00 $1,200.00
$8.00 $7,520.00
$25.00 $2,375.00
$50,000.00 $50,000.00
$25.00 $6,500.00
$1,500.00 $3,000.00
$100.00 $51,500.00
$15,000.00 $15,000.00
$350.00 $162,750.00
$4,500.00 $4,500.00
$15,000.00 $45,000.00
$100.00 $7,000.00
$3,500.00 $3,500.00
$1,127,060.00
$1,127,060.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 Hardy & Harper,
Inc - Unit Price
Hardy & Harper, Inc -
Line Total
$30,000.00 $30,000.00
$267,555.00 $267,555.00
$10,000.00 $10,000.00
$1.50 $30,750.00
$2.00 $10,220.00
$10.00 $51,100.00
$6.50 $129,350.00
$80.00 $59,600.00
$25.00 $18,000.00
$30.00 $28,200.00
$25.00 $2,375.00
$2,000.00 $10,000.00
$2,000.00 $2,000.00
$2,000.00 $6,000.00
$1,000.00 $1,000.00
$5,000.00 $10,000.00
$125.00 $98,750.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 Hardy & Harper,
Inc - Unit Price
Hardy & Harper, Inc -
Line Total
$140.00 $135,800.00
$40.00 $7,600.00
$65.00 $48,425.00
$12.00 $8,640.00
$1,500.00 $1,500.00
$20.00 $18,800.00
$60.00 $5,700.00
$15,000.00 $15,000.00
$16.00 $4,160.00
$2,000.00 $4,000.00
$15.00 $7,725.00
$13,000.00 $13,000.00
$400.00 $186,000.00
$5,000.00 $5,000.00
$10,000.00 $30,000.00
$125.00 $8,750.00
$10,000.00 $10,000.00
$1,275,000.00
$1,275,000.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790
ONYX PAVING
COMPANY INC. - Unit
Price
ONYX PAVING
COMPANY INC. - Line
Total
$100,000.00 $100,000.00
$133,697.25 $133,697.25
$10,000.00 $10,000.00
$2.10 $43,050.00
$1.25 $6,387.50
$23.20 $118,552.00
$4.15 $82,585.00
$59.50 $44,327.50
$13.00 $9,360.00
$17.00 $15,980.00
$25.50 $2,422.50
$2,300.00 $11,500.00
$830.00 $830.00
$250.00 $750.00
$4,000.00 $4,000.00
$10,000.00 $20,000.00
$180.00 $142,200.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1
ONYX PAVING
COMPANY INC. - Unit
Price
ONYX PAVING
COMPANY INC. - Line
Total
$180.00 $174,600.00
$129.00 $24,510.00
$48.00 $35,760.00
$9.00 $6,480.00
$1,000.00 $1,000.00
$14.00 $13,160.00
$33.00 $3,135.00
$14,700.00 $14,700.00
$16.80 $4,368.00
$5,100.00 $10,200.00
$23.35 $12,025.25
$13,300.00 $13,300.00
$414.00 $192,510.00
$4,800.00 $4,800.00
$10,600.00 $31,800.00
$133.00 $9,310.00
$10,700.00 $10,700.00
$1,308,000.00
$1,308,000.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 Toro Enterprises,
Inc. - Unit Price
Toro Enterprises, Inc. -
Line Total
$183,000.00 $183,000.00
$118,800.00 $118,800.00
$30,320.00 $30,320.00
$1.65 $33,825.00
$3.05 $15,585.50
$28.00 $143,080.00
$4.00 $79,600.00
$42.55 $31,699.75
$13.25 $9,540.00
$17.00 $15,980.00
$45.00 $4,275.00
$1,900.00 $9,500.00
$1,300.00 $1,300.00
$1,600.00 $4,800.00
$3,800.00 $3,800.00
$25,200.00 $50,400.00
$151.60 $119,764.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 Toro Enterprises,
Inc. - Unit Price
Toro Enterprises, Inc. -
Line Total
$140.80 $136,576.00
$93.25 $17,717.50
$75.00 $55,875.00
$18.60 $13,392.00
$1,500.00 $1,500.00
$25.30 $23,782.00
$28.50 $2,707.50
$12,900.00 $12,900.00
$33.00 $8,580.00
$1,400.00 $2,800.00
$185.30 $95,429.50
$13,900.00 $13,900.00
$276.00 $128,340.00
$5,140.00 $5,140.00
$15,160.00 $45,480.00
$156.00 $10,920.00
$8,530.00 $8,530.00
$1,438,838.75
$1,438,838.75
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 Sequel Contractors,
Inc. - Unit Price
Sequel Contractors, Inc.
- Line Total
$100,000.00 $100,000.00
$188,400.00 $188,400.00
$25,000.00 $25,000.00
$2.00 $41,000.00
$2.50 $12,775.00
$22.00 $112,420.00
$2.20 $43,780.00
$12.00 $8,940.00
$2.00 $1,440.00
$3.00 $2,820.00
$4.00 $380.00
$2,000.00 $10,000.00
$1,000.00 $1,000.00
$600.00 $1,800.00
$5,000.00 $5,000.00
$8,000.00 $16,000.00
$150.00 $118,500.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 Sequel Contractors,
Inc. - Unit Price
Sequel Contractors, Inc.
- Line Total
$150.00 $145,500.00
$235.00 $44,650.00
$55.00 $40,975.00
$13.00 $9,360.00
$5,000.00 $5,000.00
$14.00 $13,160.00
$60.00 $5,700.00
$60,000.00 $60,000.00
$30.00 $7,800.00
$2,500.00 $5,000.00
$60.00 $30,900.00
$20,000.00 $20,000.00
$600.00 $279,000.00
$12,000.00 $12,000.00
$20,000.00 $60,000.00
$100.00 $7,000.00
$10,000.00 $10,000.00
$1,445,300.00
$1,445,300.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790
SULLY-MILLER
CONTRACTING
COMPANY - Unit Price
SULLY-MILLER
CONTRACTING
COMPANY - Line Total
$135,000.00 $135,000.00
$121,000.00 $121,000.00
$4,500.00 $4,500.00
$4.00 $82,000.00
$6.00 $30,660.00
$27.00 $137,970.00
$5.50 $109,450.00
$29.00 $21,605.00
$22.00 $15,840.00
$20.00 $18,800.00
$95.00 $9,025.00
$1,800.00 $9,000.00
$2,500.00 $2,500.00
$1,000.00 $3,000.00
$500.00 $500.00
$10,000.00 $20,000.00
$210.00 $165,900.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1
SULLY-MILLER
CONTRACTING
COMPANY - Unit Price
SULLY-MILLER
CONTRACTING
COMPANY - Line Total
$201.00 $194,970.00
$200.00 $38,000.00
$41.00 $30,545.00
$22.00 $15,840.00
$4,000.00 $4,000.00
$22.00 $20,680.00
$36.00 $3,420.00
$10,000.00 $10,000.00
$31.00 $8,060.00
$1,500.00 $3,000.00
$56.00 $28,840.00
$14,000.00 $14,000.00
$315.00 $146,475.00
$11,000.00 $11,000.00
$9,000.00 $27,000.00
$92.00 $6,440.00
$5,000.00 $5,000.00
$1,454,020.00
$1,454,020.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 All American Asphalt -
Unit Price
All American Asphalt -
Line Total
$163,000.00 $163,000.00
$135,000.00 $135,000.00
$14,000.00 $14,000.00
$4.20 $86,100.00
$5.50 $28,105.00
$33.00 $168,630.00
$4.30 $85,570.00
$34.00 $25,330.00
$10.00 $7,200.00
$13.00 $12,220.00
$15.00 $1,425.00
$4,100.00 $20,500.00
$1,300.00 $1,300.00
$2,800.00 $8,400.00
$7,600.00 $7,600.00
$15,000.00 $30,000.00
$147.00 $116,130.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 All American Asphalt -
Unit Price
All American Asphalt -
Line Total
$293.00 $284,210.00
$188.00 $35,720.00
$89.00 $66,305.00
$20.00 $14,400.00
$1,300.00 $1,300.00
$32.00 $30,080.00
$57.00 $5,415.00
$22,500.00 $22,500.00
$33.00 $8,580.00
$2,800.00 $5,600.00
$11.00 $5,665.00
$13,500.00 $13,500.00
$423.00 $196,695.00
$4,880.00 $4,880.00
$10,850.00 $32,550.00
$133.00 $9,310.00
$11,000.00 $11,000.00
$1,658,220.00
$1,658,220.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790
CEM CONSTRUCTION
CORP - Unit Price
CEM CONSTRUCTION
CORP - Line Total
$80,000.00 $80,000.00
$55,000.00 $55,000.00
$15,000.00 $15,000.00
$5.00 $102,500.00
$15.00 $76,650.00
$10.00 $51,100.00
$5.00 $99,500.00
$10.00 $7,450.00
$5.00 $3,600.00
$5.00 $4,700.00
$10.00 $950.00
$2,500.00 $12,500.00
$1,250.00 $1,250.00
$1,200.00 $3,600.00
$15,000.00 $15,000.00
$8,500.00 $17,000.00
$325.00 $256,750.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1
CEM CONSTRUCTION
CORP - Unit Price
CEM CONSTRUCTION
CORP - Line Total
$350.00 $339,500.00
$200.00 $38,000.00
$125.00 $93,125.00
$40.00 $28,800.00
$12,500.00 $12,500.00
$45.00 $42,300.00
$150.00 $14,250.00
$17,500.00 $17,500.00
$110.00 $28,600.00
$150.00 $300.00
$185.00 $95,275.00
$22,500.00 $22,500.00
$375.00 $174,375.00
$9,500.00 $9,500.00
$17,500.00 $52,500.00
$125.00 $8,750.00
$3,500.00 $3,500.00
$1,783,825.00
$1,783,825.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 PALP dba Excel Paving
Company - Unit Price
PALP dba Excel
Paving Company -
Line Total
P
A
L
P
d
b
$196,000.00 $196,000.00
$329,000.00 $329,000.00
$14,000.00 $14,000.00
$4.00 $82,000.00
$9.00 $45,990.00
$19.00 $97,090.00
$5.00 $99,500.00
$24.00 $17,880.00
$10.00 $7,200.00
$12.00 $11,280.00
$14.00 $1,330.00
$3,500.00 $17,500.00
$1,800.00 $1,800.00
$1,300.00 $3,900.00
$18,000.00 $18,000.00
$65,000.00 $130,000.00
$237.00 $187,230.00
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 PALP dba Excel Paving
Company - Unit Price
PALP dba Excel
Paving Company -
Line Total
P
A
L
P
d
b
$230.00 $223,100.00
$150.00 $28,500.00
$70.00 $52,150.00
$20.00 $14,400.00
$4,000.00 $4,000.00
$31.00 $29,140.00
$43.00 $4,085.00
$21,000.00 $21,000.00
$17.00 $4,420.00
$800.00 $1,600.00
$136.00 $70,040.00
$15,000.00 $15,000.00
$400.00 $186,000.00
$9,000.00 $9,000.00
$17,000.00 $51,000.00
$76.00 $5,320.00
$9,300.00 $9,300.00
$1,987,755.00
$1,987,755.00
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
1 Mobilization LS 1
2 Traffic Control LS 1
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 4 Sawcut and Remove Existing AC Pavement SF 20500
5 Repair Up To 25% Underlying PCC Pavement SF 5110
6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 15 Modify Existing Irrigation Facilities LS 1
16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 Crosby Plumbing, Inc
- Unit Price
Crosby Plumbing, Inc -
Line Total
$75,000.00 $75,000.00
$185,000.00 $185,000.00
$45,000.00 $45,000.00
$3.95 $80,975.00
$7.20 $36,792.00
$33.98 $173,637.80
$4.08 $81,192.00
$55.20 $41,124.00
$10.39 $7,480.80
$19.90 $18,706.00
$39.37 $3,740.15
$1,500.00 $7,500.00
$1,200.00 $1,200.00
$480.00 $1,440.00
$7,500.00 $7,500.00
$15,000.00 $30,000.00
$323.16 $255,296.40
Item No Description
Unit of
Measure Qty
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 19 Construct Crushed Aggregate Base CY 190
20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 25 Pavement Markers, Markings and Traffic Striping LS 1 26 Install Traffic Signal Loop Detector LF 260
27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 Crosby Plumbing, Inc
- Unit Price
Crosby Plumbing, Inc -
Line Total
$307.58 $298,352.60
$188.84 $35,879.60
$192.00 $143,040.00
$21.60 $15,552.00
$1,800.00 $1,800.00
$30.00 $28,200.00
$60.00 $5,700.00
$110,000.00 $110,000.00
$75.00 $19,500.00
$500.00 $1,000.00
$500.00 $257,500.00
$16,000.00 $16,000.00
$525.00 $244,125.00
$3,000.00 $3,000.00
$11,000.00 $33,000.00
$225.00 $15,750.00
$7,500.00 $7,500.00
$2,287,483.35
$2,287,483.35
City of Industry
e and Rooks Road Storm Drain and Pavement Rehabilitation (CITY-1501) Issued on 11/25/2025
Due on January 22, 2026 10:00 AM (PST)
Exported on 01/22/2026
Line Totals (Unit Price * Quantity)
Item No Description
Unit of
Measure Qty
Voltaire Engineering - Unit
Price
Voltaire
Engineering - Line
Total
1 Mobilization LS 1 $30,000.00 $30,000.00
2 Traffic Control LS 1 $30,000.00 $30,000.00
3 Preparation and Implementation of the Storm Water Pollution Prevention Plan (SWPPP) LS 1 $3,795.00 $3,795.00 4 Sawcut and Remove Existing AC Pavement SF 20500 $2.00 $41,000.00 5 Repair Up To 25% Underlying PCC Pavement SF 5110 $5.50 $28,105.00 6 Remove & Replace Up To 25% of Underlying PCC Pavement SF 5110 $10.00 $51,100.00 7 Sawcut and Remove Existing AC Pavement & 3" CAB SF 19900 $2.00 $39,800.00 8 Sawcut and Remove Existing PCC Curb and Gutter Including Base, as Required LF 745 $30.00 $22,350.00 9 Sawcut and Remove Existing PCC Sidewalk and Base Materials SF 720 $5.00 $3,600.00 10 Sawcut and Remove Existing PCC Driveway and Base Materials SF 940 $5.00 $4,700.00 11 Sawcut and Remove Existing PCC Curb Ramp and Base Materials SF 95 $10.00 $950.00 12 Adjust Manhole Cover and Frame to Finished Grade EA 5 $3,000.00 $15,000.00 13 Adjust Pull Box or Utility Cover & Frame to Finish Grade EA 1 $1,300.00 $1,300.00 14 Adjust Water or Gas Valve Cover and Frame to Finished Grade EA 3 $400.00 $1,200.00 15 Modify Existing Irrigation Facilities LS 1 $3,250.00 $3,250.00 16 Remove and Salvage Existing Wrought Iron Gate and Reinstall Wrought Iron Gate on New Guide Channel. EA 2 $1,500.00 $3,000.00
17 Construct High Stability Asphalt Concrete (Type C2 PG 70-10-R0) TN 790 $200.00 $158,000.00
Item No Description
Unit of
Measure Qty
Voltaire Engineering - Unit
Price
Voltaire
Engineering - Line
Total
18 Construct Asphalt Concrete Base Course (Type B PG 64-10-R0) TN 970 $210.00 $203,700.00 19 Construct Crushed Aggregate Base CY 190 $170.00 $32,300.00 20 Construct Type A2 PCC Curb and Gutter per City of Industry Standard Plan 112 LF 745 $55.00 $40,975.00 21 Construct PCC Sidewalk and Obstruction Flare per City of Industry Standard Plan 115 SF 720 $20.00 $14,400.00 22 Construct Local Depression, Case 2, per City of Industry Standard Plan 212 EA 1 $5,500.00 $5,500.00 23 Reconstruct PCC Driveway Per Modified City of Industry Std. Plan No. 114 SF 940 $25.00 $23,500.00 24 Reconstruct PCC Curb Ramp per Caltrans Std. Plan A88A SF 95 $75.00 $7,125.00 25 Pavement Markers, Markings and Traffic Striping LS 1 $33,075.00 $33,075.00 26 Install Traffic Signal Loop Detector LF 260 $20.00 $5,200.00 27 Adjust Survey Monument Handhole Cover to Finish Grade EA 2 $400.00 $800.00 28 Sawcut and Remove Existing AC Pavement, CAB and Excavate Trench CY 515 $65.00 $33,475.00 29 Construct Catch Basin per SPPWC Standard Plan 300-4 EA 1 $12,000.00 $12,000.00 30 Construct 24" RCP per Plan with Sand Trench Backfill per Detail A on Sheet 7 LF 465 $179.00 $83,235.00 31 Construct Junction Structure per SPPWC Standard Plan No. 331-3 EA 1 $5,000.00 $5,000.00 32 Construct Manhole Structure per SPPWC Standard Plan No. 321-2 EA 3 $7,000.00 $21,000.00 33 8-inch Crushed Aggregate Base per Detail A on Sheet 7 CY 70 $160.00 $11,200.00 34 Remove and Replace Curb, Dowels and Face Plate at Existing Catch Basin EA 1 $6,000.00 $6,000.00 Subtotal $975,635.00
Total $975,635.00
!"#$%&'$"%()*+',#),-,$&+./"%*+',#),0
1123413
56789:6;<=>:?@ABCDBDEFEGDAHBAIJKLM@NBD@COLKPFE@LCEFIBCOKLPEHB879Q ?@ABCDBNFEFRFDBSQBOLKBKB?T@CULCEH@D@COLKPFE@LCVTLGDHLG?NRBFWFKBLOEHB OL??LW@CU?@P@EFE@LCDS
XY)+#,))Z#/"%[&$+"#
\]^_``ab^a``_^ab^ac
dce_^b`\`
_`a
fc
gd
e
hi
ajklgdgmndd
<CE@ETc
o
6DDGB5FEBpd
<qJ@KB5FEB rstuvtwrwx
*+',#),y$&$Y)
zH@D?@ABCDB@DAGKKBCEFCNFAE@MBS
:??@COLKPFE@LCRB?LWDHLG?NRBKBM@BWBNS
!.&))+/+'&$+"#)
X"#{+#|Z#/"%[&$+"#
c
}
e
~
]i
~c
}
e
~
i_c^a
_ac`cha
QLCNGPRBK>
gnp
QLCN:PLGCE>pf
<
BAE@MB5FEB>p
p
c
}
e
~
e
~
^ ~
~
]i
~
~h`]`_`b
~ii
i
o
i
j
i
o
i
o i
fie
~
^ ~
~
~
<
BAE@MB5FEB>pd
"%,%)(!"[,#)&$+"#
]i
i
o
ii`\`_`
]h_`^`_^a
_ac`
cha
L?@ATGPRBK>gnp
<
BAE@MB5FEB>dnp
<qJ@KB5FEB>dn
}c
o
c
e
o
~
~jkehgdl^
i
j
oj
o
~
i
ooj
c
i
~
~
j
~
~
o
~
c
e~
~kehgggl
j
~
i
o
ii
~fij
ii
j ~
ij
~}
~j
mb`a`_`ab^a``_^ab
emb`a`_e^^ab
"
!
#
$
%
&
'
(
)
(
)
!"#$%&''()&(''&()*&(+
,--,-./01/23456789::;<8;::98;<=8;>?
>@ABCDEF7GGC@HB5CCI@J
KL>9
,--,-./01/
>CHBFMGBCFNBMB@A
>N5O
,,P-Q,-
O@ARHEAAKSCHE
T-T.0.U0,0
:VB
9EWRABFMBRCHNBMFBXMBE
X897JJFCYEZ
!"
#$%!#& "
' #$($'$ ) )!
"
!$*" '"
"! + + , "-"" '"- . /"
0'"
1
2+/
3
1
1
(
1
4-
! "
#
$
%
&
$
'
$
'
(
) )
&
"
*
+ +
NOTICE OF EXEMPTION
To: County Clerk
County of Los Angeles
Environmental Filings
12400 East Imperial Highway #2001
Norwalk, CA 90650
From: City of Industry
15625 Mayor Dave Way
City of Industry, CA 91744
Project Title: CITY-1501 Kella Avenue and Rooks Road Storm Drain and Pavement Rehabilitation Project Location - Specific: Kella Avenue and Rooks Road at the 605 Freeway Project Location-City: City of Industry Project Location-County: Los Angeles Description of Project: Asphalt concrete and Portland Cement removal, construction, and repair. Concrete sidewalk removal and reconstruction, trenching, storm drain and catch basin construction and signing and striping.
Name of Public Agency Approving Project: City of Industry Name of Person or Agency Carrying Out Project: City of Industry Exempt Status: (check one)
Ministerial (Sec. 21080(b)(1); 15268);
Declared Emergency (Sec. 21080(b)(3); 15269(a));
Emergency Project (Sec. 21080(b)(4); 15269(b)(c));
Categorical Exemption. State type and section number: 15301 Class 1 Statutory Exemptions. State code number:
Reasons why project is exempt: The proposed project is exempt from the California Environmental Quality Act (“CEQA”) per Section 15301 Class 1 of the CEQA Regulations in which the minor alteration of existing public or private structures or facilities involve negligible or no expansion of existing use. This project will reconstruct the existing pavement section on Kella Avenue and a portion of Rooks Road; construction of a 24-inch reinforced concrete pipe storm drain and catch basins; repair broken curbs, gutters, driveways, and sidewalks, upgrade curb ramps to current ADA standard, adjust existing utility covers to finish grade, and install pavement markings, striping, and re-paint red curb throughout. The project does not result in an expansion of the use, as the streets are not being expanded to allow for additional traffic, it’s simply routine maintenance work.
Lead Agency
Contact Person: Mathew Hudson Telephone: (626) 333-2211 Signature: Date: March 12, 2026
Title: Director of Public Works
ITEM NO. 6.3
Backup Material will be distributed prior to Meeting
ITEM NO. 6.4
Verbal Presentation
ITEM NO. 7.1
Verbal Presentation