Cities Index.
Agenda packet

Industry City Council
July 23, 2026

Document
Agenda packet
Meeting
July 23, 2026
Body
Industry City Council
Pages
211
Original file
22.7 MB
Text extracted from the city's file for reading and search. Open the original on industryca.api.civicclerk.com. That file is the official record.

CITY COUNCIL REGULAR MEETING AGENDA
JULY 23, 2026

CITY COUNCIL

REGULAR MEETING
AGENDA
JULY 23, 2026 AT 9:00 AM

MAYOR CORY MOSS

MAYOR PRO TEM MICHAEL GREUBEL

COUNCIL MEMBER STEVE MARCUCCI
COUNCIL MEMBER MARK D. RADECKI

COUNCIL MEMBER NEWELL RUGGLES
LOCATION: City Council Chambers, 15651 Mayor Dave Way, City of Industry, California Watch Live Meetings: https://publicinput.com/cityofindustry Or call in or scan
Phone #: (855) 925-2801 Meeting Code: 6943
ADDRESSING THE CITY COUNCIL:

Agenda Items: (In Person Comments) : Members of the public may address the City Council on any matter listed on the Agenda. In order to conduct a timely meeting, there will be a one-minute time limit per person for any matter listed on the Agenda. Anyone wishing to speak to the City Council is asked to complete a Speaker’s Card or register online with the QR Code which both can be found at the back of the room and at the podium.

The completed card should be submitted to the City Clerk prior to the Agenda item being called and prior to the individual being heard by the City Council.

In Person Public Comments (Non-Agenda Items): Anyone wishing to address the City Council on an item not on the Agenda may do so during the “Public Comments” period. In order to conduct a timely meeting, there will be a one-minute time limit per person for the Public Comments portion of the Agenda. State law prohibits the City Council from taking action on a specific item unless it appears on the posted Agenda. Anyone wishing to speak to the City Council is asked to complete a Speaker’s Card or register online with the QR code which both can be found at the back of the room and at the podium. The completed card should be submitted to the City Clerk prior to the Agenda item being called by the City Clerk and prior to the individual being heard by the City Council.

Electronic Comments: Visit https://publicinput.com/cityofindustry Click register, the system will prompt you to create a password then locate desired meeting click register for this meeting. Fill in details such as name, email, phone number, preferred attendance method and request to speak. Click submit. You will receive an email confirmation with meeting details, including the date, time, link, and access instructions.

AMERICANS WITH DISABILITIES ACT:

In compliance with the ADA, if you need special assistance to participate in any City meeting (including assisted listening devices), please contact the City Clerk’s Office (626) 333-2211. Notification of at least 48 hours prior to the meeting will assist staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting.

AGENDAS AND OTHER WRITINGS:

In compliance with SB 343, staff reports and other public records permissible for disclosure related to open session agenda items are available at City Hall, 15625 Mayor Dave Way, City of Industry, California, at the office of the City Clerk during regular business hours, Monday through Thursday 8:00 a.m. to 5:00 p.m., Fridays 8:00 a.m. to 4:00 p.m. Any person with a question concerning any agenda item may call the City Clerk’s Office at (626) 333-2211.

Page 1 of 211 ends

CITY COUNCIL REGULAR MEETING AGENDA
JULY 23, 2026

1. Call to Order

2. Flag Salute

3. AB 2449 Vote on Emergency Circumstances (if necessary)

4. Roll Call

5. Presentations-Homestead Quarterly Update

6. CONSENT CALENDAR

6.1. Consideration of the Register of Demands for July 23, 2026 RECOMMENDED ACTION: Approve the Register of Demands and authorize the appropriate personnel to pay the bills.

6.2. Consideration of a Maintenance Services Agreement with Garcia’s Fence Corporation, for City-owned properties and City right of way fence and gate maintenance, in an amount not to exceed $225,000.00, through June 30, 2029
RECOMMENDED ACTION: Approve the Agreement.

6.3. Consideration of authorization to advertise for public bids for Contract No.

CITY-1546, Annual Slurry FY25, for an estimated cost of $598,000 (MP 24- 05)
RECOMMENDED ACTION: Approve the plans and specifications and authorize the solicitation of public bids.

6.4. Consideration of Amendment No. 1 to the Professional Services Agreement with Fehr & Peers for On-call Transportation Planning and Analysis Services extending the term through June 30, 2031 and updating the rate schedule
RECOMMENDED ACTION: Approve Amendment No. 1.

6.5. Consideration of a Sewer System Management Plan, and Adoption of a Notice of Exemption regarding same
RECOMMENDED ACTION: Approve the 2026 Sewer System
Management Plan, adopt a Notice of Exemption for the Plan.

Page 2 of 211 ends

CITY COUNCIL REGULAR MEETING AGENDA
JULY 23, 2026

6.6. Consideration of Amendment No. 1 to the Professional Services Agreement with NHA Advisors, LLC, for financial advisory services to the City, increasing compensation by $200,000.00
RECOMMENDED ACTION: Approve Amendment No. 1 to the
Professional Services Agreement with NHA

7. ACTION ITEMS-NONE

8. PUBLIC HEARINGS-NONE

9. CLOSED SESSION

9.1. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION Pursuant to Government Code Section 54956.9(d)(1)
Case: Puente Hills Community Preservation Association, et al. v. City of Industry, et al.

Los Angeles County Superior Court Case No. 26STCP01080

9.2. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION Pursuant to Government Code Section 54956.9(d)(1)
Case: City of Industry v. Legacy Point, LLC
Los Angeles County Superior Court Case No. 25STCV03700

9.3. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION Pursuant to Government Code Section 54956.9(d)(1)
Case: City of Industry v. Legacy City Center, LLC
Los Angeles County Superior Court Case No. 25STCV03524

9.4. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION Pursuant to Government Code Section 54956.9(d)(1)
Case: City of Industry v. E-Ho One, LLC, et al
Los Angeles County Superior Court Case No. 25STCV03695

9.5. CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION Pursuant to Government Code Section 54956.9(d)(1)
Case: Legacy Point, LLC v. City of Industry, et al.

Los Angeles County Superior Court Case No. 24STCV20043

Page 3 of 211 ends

CITY COUNCIL REGULAR MEETING AGENDA
JULY 23, 2026

9.6. CONFERENCE WITH REAL PROPERTY NEGOTIATORS Pursuant to Government Code Section 54956.8:

Property: Two vacant lots on East Nelson Avenue, west
of Maypop Avenue Assessor Parcel Numbers: 8208-024-906 and 8208- 024-907
Agency Negotiators: Joshua Nelson, City Manager,
James Casso, City Attorney
Negotiating Parties: HKTSNTRLT LLC
Under Negotiation: Price and terms of payment

9.7 CONFERENCE WITH REAL PROPERTY NEGOTIATORS Pursuant to Government Code Section 54956.8:

Property: 17545 Gale Ave Assessor Parcel Number:
8264-012-919
Agency Negotiators:        Joshua Nelson, City Manager, James Casso, City Attorney
Negotiating Parties:        Best Buy Stores, L.P.

Under Negotiation:        Price and terms of payment.

9.8 CONFERENCE WITH LEGAL COUNSEL—ANTICIPATED LITIGATION Significant exposure to litigation; Pursuant to Government Code section 54956.9(d)(2), One potential case

Page 4 of 211 ends

CITY COUNCIL REGULAR MEETING AGENDA
JULY 23, 2026

10. CITY MANAGER REPORTS

11. AB 1234 REPORTS

12. CITY COUNCIL COMMUNICATIONS

13. PUBLIC COMMENTS

14. Adjournment. The next regular City Council Meeting is Thursday, August 13, 2026, at 9:00 AM.

Page 5 of 211 ends

ITEM NO. 6.1

Page 6 of 211 ends
Page 7 of 211 ends
Page 8 of 211 ends
Page 9 of 211 ends
Page 10 of 211 ends
Page 11 of 211 ends
Page 12 of 211 ends
Page 13 of 211 ends
Page 14 of 211 ends
Page 15 of 211 ends
Page 16 of 211 ends
Page 17 of 211 ends
Page 18 of 211 ends
Page 19 of 211 ends
Page 20 of 211 ends
Page 21 of 211 ends
Page 22 of 211 ends
Page 23 of 211 ends
Page 24 of 211 ends
Page 25 of 211 ends
Page 26 of 211 ends
Page 27 of 211 ends
Page 28 of 211 ends
Page 29 of 211 ends
Page 30 of 211 ends
Page 31 of 211 ends
Page 32 of 211 ends
Page 33 of 211 ends
Page 34 of 211 ends
Page 35 of 211 ends
Page 36 of 211 ends
Page 37 of 211 ends
Page 38 of 211 ends

ITEM NO. 6.2

Page 39 of 211 ends

MEMORANDUM
TO: Honorable Mayor and Members of the City Council
FROM: Joshua Nelson, City Manager
STAFF: Mathew Hudson, Director of Public Works
James Cramsie, Sr. Director of Engineering
Justin Aguilar, Field Operations Project Manager
DATE: July 23, 2026
SUBJECT: Consideration of a Maintenance Services Agreement with Garcia’s Fence Corporation, for City-owned properties and City right of way fence and gate maintenance, in an amount not to exceed $225,000.00, through June 30, 2029
Background:

The City currently does not have an on-call contractor to maintain perimeter and security fencing along the public right of way and on City-owned properties. Garcia’s Fence Corporation (“Garcia’s) has provided fencing-related maintenance and repairs for the City for several years, which have been approved and paid for under separate purchase orders each time. Garcia’s provides the materials needed to support the safety and security for related fence maintenance needs. Garcia’s is a locally owned and operated service provider that can respond quickly and efficiently to service all fencing related services.

Discussion:

Fence maintenance and repairs have been an increasing need in the City, and having a contractor on-call to support this growing need moving forward would be beneficial for Staff.

Staff recommends approving a Maintenance Services Agreement with Garcia’s through June 30, 2029, to provide these services in an amount not to exceed $225,000.00. The locations with fences and gates in the City include:

Page 40 of 211 ends

1123 -1135 Hatcher Ave
130-138 Turnbull Canyon Rd
205 Hudson Ave
150 S. Hacienda Blvd
220 S. Hacienda Blvd
242 S. Hacienda Blvd
15710 Rausch Rd
15625 Mayor Dave Way
15651 Mayor Dave Way
15415 Don Julian Rd
555 El Encanto Rd
13900-13910Lomita Ave
290 San Fidel Ave
747 Anaheim-Puente Rd
1 Industry Hills Pkwy
600 Brea Canyon Rd
208 Waddingham Way
1146 S. Nogales St
19772 Business Parkway
19001 Tonner Canyon Road
Additional City-owned parcels include APNs 8269-036-270 (off of Brea Canyon Cutoff Road), 8719-009-915 (strip of land west of the IBC), and 8269-008-270 (open space west of the 57 freeway, south of Pathfinder Road).

Fiscal Impact:

The fiscal impact is $225,000.00. This is funded under various accounts within the adopted Fiscal Year 2026-2027 General Fund Budget, depending on the location within the City the work

Page 41 of 211 ends

was done. The accounts include: 100-624-7410 (Public Right of Way Maintenance), 100-628- 8510 (Property Maintenance), MP 00 20 (Tonner Canyon Property), 100-625-8510 (Property Maintenance), MP 12 06 26 (Turnbull Canyon Properties), 100-625-8510 (Property Maintenance), and MP 14 10 (City Maintenance Yard at 1123 Hatcher Avenue).

Recommendation:

Approve the Maintenance Services Agreement with Garcia’s Fence Corporation.

Exhibits:

1. Maintenance Services Agreement with Garcia’s Fence Corporation, dated July 23, 2026

Page 42 of 211 ends
Page 1 of 17 ends

CITY OF INDUSTRY

MAINTENANCE SERVICES AGREEMENT
This MAINTENANCE SERVICES AGREEMENT (“Agreement”), is made and effective as of July 23, 2026 (“Effective Date”), between the City of Industry, a municipal corporation (“City”) and Garcia’s Fence Corporation, a California corporation (“Contractor”). The City and Contractor are hereinafter collectively referred to as the “Parties”.

RECITALS
WHEREAS, City desires to engage Contractor to perform the services described herein, and Contractor desires to perform such services in accordance with the terms and conditions set forth herein.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions herein contained, City and Contractor agree as follows:

1. TERM
This Agreement shall commence on the Effective Date, and shall remain and continue in effect until tasks described herein are completed, but in no event later than June 30, 2029, unless sooner terminated pursuant to the provisions of this Agreement.

2. SERVICES
(a) Contractor shall perform the tasks (“Services”) described and set forth in Exhibit A, attached hereto and incorporated herein as though set forth in full. (“Scope of Services”). Tasks other than those specifically described in the Scope of Services shall not be performed without prior written approval of the City. The Services shall be performed by Contractor, unless prior written approval is first obtained from the City. In the event of conflict or inconsistency between the terms of this Agreement and Exhibit A, the terms of this Agreement shall prevail.
(b) City shall have the right to request, in writing, changes to the Services. Any such changes mutually agreed upon by the Parties, and any corresponding increase or decrease in compensation, shall be incorporated by written amendment to this Agreement.
(c) Contractor shall perform all Services in a manner reasonably satisfactory to the City and in a first-class manner in conformance with the standards of quality normally observed by an entity providing fence and gate related maintenance services, serving a municipal agency.
(d) Contractor shall comply with all applicable federal, state, and local laws, regulations and ordinances in the performance of this Agreement, including but not limited to, the conflict of interest provisions of Government Code Section 1090 and the

Page 43 of 211 ends
Page 2 of 17 ends

Political Reform Act (Government Code Section 81000 et seq.)). During the term of this Agreement, Contractor shall not perform any work for another person or entity for whom Contractor was not working on the Effective Date if both (i) such work would require Contractor to abstain from a decision under this Agreement pursuant to a conflict of interest statute or law; and (ii) City has not consented in writing to Contractor’s performance of such work. No officer or employee of City shall have any financial interest in this Agreement that would violate California Government Code Sections 1090 et seq. Contractor hereby warrants that it is not now, nor has it been in the previous twelve (12) months, an employee, agent, appointee, or official of the City. If Contractor was an employee, agent, appointee, or official of the City in the previous twelve (12) months, Contractor warrants that it did not participate in any manner in the forming of this Agreement. Contractor understands that, if this Agreement is made in violation of Government Code §1090 et seq., the entire Agreement is void and Contractor will not be entitled to any compensation for Services performed pursuant to this Agreement, and Contractor will be required to reimburse the City for any sums paid to the Contractor. Contractor understands that, in addition to the foregoing, it may be subject to criminal prosecution for a violation of Government Code § 1090 and, if applicable, will be disqualified from holding public office in the State of California. (e) Contractor represents that it has, or will secure at its own expense, all licensed personnel required to perform the Services. All Services shall be performed by Contractor or under its supervision, and all personnel engaged in the Services shall be qualified and licensed to perform such services.

3. MANAGEMENT
City Manager shall represent the City in all matters pertaining to the administration of this Agreement, review and approval of all products submitted by Contractor, but shall have no authority to modify the Services or the compensation due to Contractor.

4. PAYMENT
(a) The City agrees to pay Contractor monthly, in accordance with the payment rates and terms and the schedule of payment as set forth in Exhibit B (“Rate Schedule”), attached hereto and incorporated herein by this reference as though set forth in full, based upon actual time spent on the above tasks. This amount shall not exceed Two Hundred Twenty Five Thousand dollars ($225,000.00) for the total Term of the Agreement unless additional payment is approved as provided in this Agreement.
(b) Contractor shall not be compensated for any services rendered in connection with its performance of this Agreement which are in addition to those set forth herein, unless such additional services are authorized in advance and in writing by the City. Contractor shall be compensated for any additional services in the amounts and in the manner as agreed to by City and Contractor at the time City’s written authorization is given to Contractor for the performance of said services.

Page 44 of 211 ends
Page 3 of 17 ends

(c) Contractor shall submit invoices monthly for actual services performed. Invoices shall be submitted on or about the first business day of each month, or as soon thereafter as practical, for services provided in the previous month. Payment shall be made within thirty (30) days of receipt of each invoice as to all non-disputed fees. If the City disputes any of Contractor’s fees it shall give written notice to Contractor within thirty (30) days of receipt of an invoice of any disputed fees set forth on the invoice. Any final payment under this Agreement shall be made within 45 days of receipt of an invoice therefore.

5. LABOR CODE AND PREVAILING WAGES
(a) Contractor represents and warrants that it is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “Public Works" and “Maintenance” projects. If the Services are being performed as part of an applicable “Public Works” or “Maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $15,000.00 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and any location where the Services are performed. Contractor shall indemnify, defend and hold harmless, the City, its elected officials, officers, employees and agents, from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including legal counsel fees and costs, court costs, interest, defense costs, and expert witness fees), where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, Contractor’s or by any individual or agency for which Contractor is legally liable, including but not limited to officers, agents, employees or subcontractors of Contractor, failure or alleged failure to comply with Prevailing Wage Laws. (b) In accordance with the requirements of Labor Code Section 1776, Contractor shall keep accurate payroll records which are either on forms provided by the Division of Labor Standards Enforcement or which contain the same information required by such forms. Contractor shall make all such records available for inspection at all reasonable hours.
(c) To the extent applicable, Consultant shall comply with the provisions of Section 1777.5 of the Labor Code with respect to the employment of properly registered apprentices upon public works.
(d) Contractor shall comply with the legal days work and overtime requirements of Sections 1813 and 1815 of the Labor Code.

Page 45 of 211 ends
Page 4 of 17 ends

(e) If the Services are being performed as part of an applicable Public Works or Maintenance project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Contractor and all subcontractors performing such Services must be registered with the Department of Industrial Relations. Contractor shall maintain registration for the duration of the Agreement and require the same of any subcontractors, as applicable. The Services set forth in this Agreement may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Contractor's sole responsibility to comply with all applicable registration and labor compliance requirements.

6. SUSPENSION OR TERMINATION OF AGREEMENT
(a) The City may at any time, for any reason, with or without cause, suspend or terminate this Agreement, or any portion hereof, by serving upon the Contractor at least ten (10) days prior written notice. Upon receipt of said notice, the Contractor shall immediately cease all work under this Agreement, unless the notice provides otherwise. If the City suspends or terminates a portion of this Agreement such suspension or termination shall not make void or invalidate the remainder of this Agreement. (b) In the event this Agreement is terminated pursuant to this Section, the City shall pay to Contractor the actual value of the work performed up to the time of termination, provided that the work performed is of value to the City. Upon termination of the Agreement pursuant to this Section, the Contractor shall submit an invoice to the City pursuant to Section 5 of this Agreement.

7. OWNERSHIP OF DOCUMENTS
(a) Contractor shall maintain complete and accurate records with respect to sales, costs, expenses, receipts, and other such information required by City that relate to the performance of services under this Agreement. Contractor shall maintain adequate records of services provided in sufficient detail to permit an evaluation of services. All such records shall be maintained in accordance with generally accepted accounting principles and shall be clearly identified and readily accessible. Contractor shall provide free access to the representatives of City or its designees at reasonable times to review such books and records; shall give City the right to examine and audit said books and records; shall permit City to make transcripts or copies therefrom as necessary; and shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement. Such records, together with supporting documents, shall be maintained for a period of three (3) years after receipt of final payment.
(b) Upon completion of, or in the event of termination or suspension of this Agreement, all original documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared in the course of providing the services to be performed pursuant to this Agreement shall become the sole property of the City and may be used, reused, or otherwise disposed of by the City without the permission of the Contractor. With respect to computer files, Contractor shall make available to the City, at the Contractor’s office, and upon reasonable written request by the City, the necessary computer software and hardware for purposes of accessing, compiling, transferring, copying

Page 46 of 211 ends
Page 5 of 17 ends

and/or printing computer files. Contractor hereby grants to City all right, title, and interest, including any copyright, in and to the documents, designs, drawings, maps, models, computer files, surveys, notes, and other documents prepared by Contractor in the course of providing the services under this Agreement. All reports, documents, or other written material developed by Contractor in the performance of the Services pursuant to this Agreement, shall be and remain the property of the City.

8. INDEMNIFICATION
(a) Indemnity for professional liability
When the law establishes a professional standard of care for Contractor’s Services, to the fullest extent permitted by law, Contractor shall indemnify, protect, defend and hold harmless the City and any and all of its officials, employees and agents (“Indemnified Parties”) from and against any and all losses, liabilities, damages, costs and expenses, including legal counsel’s fees and costs caused in whole or in part by any negligent or wrongful act, error or omission of Contractor, its officers, agents, employees or Subcontractors (or any agency or individual that Contractor shall bear the legal liability thereof) in the performance of professional services under this Agreement. (b) Indemnity other than for professional liability
Other than in the performance of professional services and to the full extent permitted by law, Contractor shall indemnify, defend and hold harmless City, and any and all of its employees, officials and agents from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including legal counsel fees and costs, court costs, interest, defense costs, and expert witness fees), where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Contractor or by any individual or agency for which Contractor is legally liable, including but not limited to officers, agents, employees or subcontractors of Contractor.
(c) Duty to defend.

In the event the City, its officers, employees, agents and/or volunteers are made a party to any action, claim, lawsuit, or other adversarial proceeding arising from the performance of the services encompassed by this Agreement, and upon demand by City, Contractor shall have an immediate duty to defend the City at Contractor’s cost or at City’s option, to reimburse the City for its costs of defense, including reasonable attorney’s fees and costs incurred in the defense of such matters.

Payment by City is not a condition precedent to enforcement of this indemnity. In the event of any dispute between Contractor and City, as to whether liability arises from the sole negligence of the City or its officers, employees, or agents, Contractor will be obligated to pay for City’s defense until such time as a final judgment has been entered adjudicating the City as solely negligent. Contractor will not be entitled in the absence of such a

Page 47 of 211 ends
Page 6 of 17 ends

determination to any reimbursement of defense costs including but not limited to attorney’s fees, expert fees and costs of litigation.

9. INSURANCE
Contractor shall maintain prior to the beginning of and for the duration of this Agreement insurance coverage as specified in Exhibit C attached hereto and incorporated herein by reference.

10. INDEPENDENT CONTRACTOR
(a) Contractor is and shall at all times remain as to the City a wholly independent Contractor and/or independent contractor. The personnel performing the services under this Agreement on behalf of Contractor shall at all times be under Contractors exclusive direction and control. Neither City nor any of its officers, employees, or agents shall have control over the conduct of Contractor or any of Contractor’s officers, employees, or agents, except as set forth in this Agreement. Contractor shall not at any time or in any manner represent that it or any of its officers, employees, or agents are in any manner officers, employees, or agents of the City. Contractor shall not incur or have the power to incur any debt, obligation, or liability whatever against the City, or bind the City in any manner. (b) No employee benefits shall be available to Contractor in connection with the performance of this Agreement. Except for the fees paid to Contractor as provided in the Agreement, City shall not pay salaries, wages, or other compensation to Contractor for performing services hereunder for City. City shall not be liable for compensation or indemnification to Contractor for injury or sickness arising out of performing services hereunder.
(c) Contractor shall indemnify, defend and hold harmless, the City, its elected officials, officers, employees and agents, from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including contributions to any retirement and/or pension plan, legal counsel fees and costs, court costs, interest, defense costs, and expert witness fees), where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, Contractor’s or by any individual or agency for which Contractor is legally liable, including but not limited to officers, agents, employees or subcontractor of Contractor, service as an independent contractor. The indemnity provisions set forth in this Section 10 (c) shall survive the termination of this Agreement, and are in addition to any other rights or remedies the City may have under the law.

11. LEGAL RESPONSIBILITIES
The Contractor shall keep itself informed of State and Federal laws and regulations which in any manner affect those employed by it or in any way affect the performance of its service pursuant to this Agreement. The Contractor shall at all times observe and comply

Page 48 of 211 ends
Page 7 of 17 ends

with all such laws and regulations. The City, and its officers and employees, shall not be liable at law or in equity occasioned by failure of the Contractor to comply with this Section.

12. UNDUE INFLUENCE
Contractor declares and warrants that no undue influence or pressure was used against or in concert with any officer or employee of the City in connection with the award, terms or implementation of this Agreement, including any method of coercion, confidential financial arrangement, or financial inducement. No officer or employee of the City has or will receive compensation, directly or indirectly, from Contractor, or from any officer, employee or agent of Contractor, in connection with the award of this Agreement or any work to be conducted as a result of this Agreement. Violation of this Section shall be a material breach of this Agreement entitling the City to any and all remedies at law or in equity.

13. NO BENEFIT TO ARISE TO LOCAL OFFICERS AND EMPLOYEES No member, officer, or employee of City, or their designees or agents, and no public official who exercises authority over or responsibilities with respect to the Project during his/her tenure or for one year thereafter, shall have any interest, direct or indirect, in any agreement or sub-agreement, or the proceeds thereof, for work to be performed in connection with the Project performed under this Agreement.

14. RELEASE OF INFORMATION/CONFLICTS OF INTEREST
(a) All information gained by Contractor in performance of this Agreement shall be considered confidential and shall not be released by Contractor without City’s prior written authorization. Contractor, its officers, employees, agents, or subcontractors, shall not without written authorization from the City, voluntarily provide declarations, letters of support, testimony at depositions, response to interrogatories, or other information concerning the work performed under this Agreement or relating to any project or property located within the City, unless otherwise required by law or court order. (b) Contractor shall promptly notify City should Contractor, its officers, employees, agents, or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions, or other discovery request (“Discovery”), court order, or subpoena from any person or party regarding this Agreement and the work performed there under or with respect to any project or property located within the City, unless Contractor is prohibited by law from informing the City of such Discovery, court order or subpoena. City retains the right, but has no obligation, to represent Contractor and/or be present at any deposition, hearing, or similar proceeding as allowed by law. Unless City is a party to the lawsuit, arbitration, or administrative proceeding and is adverse to Contractor in such proceeding, Contractor agrees to cooperate fully with the City and to provide the opportunity to review any response to discovery requests provided by Contractor. However, City's right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response.

Page 49 of 211 ends
Page 8 of 17 ends

15. NOTICES
Any notices which either party may desire to give to the other party under this Agreement must be in writing and may be given either by (i) personal service, (ii) delivery by a reputable document delivery service, such as but not limited to, Federal Express, which provides a receipt showing date and time of delivery, or (iii) mailing in the United States Mail, certified mail, postage prepaid, return receipt requested, addressed to the address of the party as set forth below or at any other address as that party may later designate by notice:

To City: City of Industry
15625 Mayor Dave Way
City of Industry, CA 91744

Attention: City Manager
With a Copy To: Casso & Sparks, LLP
13300 Crossroads Parkway North, Suite 410
City of Industry, CA 91746
Attention: James M. Casso, City Attorney
To Contractor: Garcia’s Fence Corporation
614 Giano Avenue
La Puente, CA 91744
Attention: Jose J. Garcia, C.E.O

16. ASSIGNMENT
The Contractor shall not assign the performance of this Agreement, nor any part thereof, nor any monies due hereunder, without prior written consent of the City.

Before retaining or contracting with any subcontractor for any services under this Agreement, Contractor shall provide City with the identity of the proposed subcontractor, a copy of the proposed written contract between Contractor and such subcontractor which shall include and indemnity provision similar to the one provided herein and identifying City as an indemnified party, or an incorporation of the indemnity provision provided herein, and proof that such proposed subcontractor carries insurance at least equal to that required by this Agreement or obtain a written waiver from the City for such insurance.

Notwithstanding Contractor’s use of any subcontractor, Contractor shall be responsible to the City for the performance of its subconsultant as it would be if Contractor had performed the Services itself. Nothing in this Agreement shall be deemed or construed to create a contractual relationship between the City and any subcontractor employed by Contractor. Contractor shall be solely responsible for payments to any subcontractors.

Contractor shall indemnify, defend and hold harmless the Indemnified Parties for any claims arising from, or related to, the services performed by a subcontractor under this Agreement.

Page 50 of 211 ends
Page 9 of 17 ends

17. GOVERNING LAW/ATTORNEYS’ FEES
The City and Contractor understand and agree that the laws of the State of California shall govern the rights, obligations, duties, and liabilities of the parties to this Agreement and also govern the interpretation of this Agreement. Any litigation concerning this Agreement shall take place in the municipal, superior, or federal district court in Los Angeles County, California. If any action at law or suit in equity is brought to enforce or interpret the provisions of this Agreement, or arising out of or relating to the Services provided by Contractor under this Agreement, the prevailing party shall be entitled to reasonable attorneys' fees and all related costs, including costs of expert witnesses and Contractors, as well as costs on appeal, in addition to any other relief to which it may be entitled.

18. ENTIRE AGREEMENT
This Agreement contains the entire understanding between the Parties relating to the obligations of the Parties described in this Agreement. All prior or contemporaneous agreements, understandings, representations, and statements, oral or written and pertaining to the subject of this Agreement or with respect to the terms and conditions of this Agreement, are merged into this Agreement and shall be of no further force or effect. Each party is entering into this Agreement based solely upon the representations set forth herein and upon each party's own independent investigation of any and all facts such party deems material.

19. SEVERABILITY
If any term or provision of this Agreement or the application thereof to any person or circumstance shall, to any extent, be invalid or unenforceable, then such term or provision shall be amended to, and solely to, the extent necessary to cure such invalidity or unenforceability, and in its amended form shall be enforceable. In such event, the remainder of this Agreement, or the application of such term or provision to persons or circumstances other than those as to which it is held invalid or unenforceable, shall not be affected thereby, and each term and provision of this Agreement shall be valid and be enforced to the fullest extent permitted by law.

20. COUNTERPARTS
This Agreement may be executed in multiple counterparts, each of which shall be deemed an original, but all of which taken together shall constitute one and the same instrument.

21. CAPTIONS
The captions appearing at the commencement of the sections hereof, and in any paragraph thereof, are descriptive only and shall have no significance in the interpretation of this Agreement.

Page 51 of 211 ends
Page 10 of 17 ends

22. WAIVER
The waiver by City or Contractor of any breach of any term, covenant or condition herein contained shall not be deemed to be a waiver of such term, covenant or condition or of any subsequent breach of the same or any other term, covenant or condition herein contained. No term, covenant or condition of this Agreement shall be deemed to have been waived by City or Contractor unless in writing.

23. REMEDIES
Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such party of any of all of such other rights, powers or remedies.

24. AUTHORITY TO EXECUTE THIS AGREEMENT
The person or persons executing this Agreement on behalf of Contractor represents and warrants that he/she has the authority to execute this Agreement on behalf of the Contractor and has the authority to bind Contractor to the performance of its obligations hereunder.

IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the Effective Date.
“CITY” “CONTRACTOR”
City of Industry Garcia’s Fence Corporation
By:________________________________ By__________________________ Joshua Nelson, City Manager Jose T. Garcia, C.E.O

Attest:

By:______________________________
Julie Gutierrez-Robles, City Clerk
Approved as to form:

By:

James M. Casso, City Attorney

Page 52 of 211 ends
Page 11 of 17 ends

Attachments: Exhibit A Scope of Services
Exhibit B Rate Schedule
Exhibit C Insurance Requirements

Page 53 of 211 ends
Page 12 of 17 ends

EXHIBIT A

SCOPE OF SERVICES
The Contractor shall provide the following maintenance services at the below listed Cityowned properties and Citywide right-of-way perimeter fences, gates, and operators:

Locations
1123 -1135 Hatcher Ave (MP 14-10)
130-138 Turnbull Canyon Rd (MP 12-06 #26)
205 Hudson Ave (JN-6201)
150 S. Hacienda Blvd (JN-6201)
220 S. Hacienda Blvd (JN-6201)
242 S. Hacienda Blvd (JN-6201)
15710 Rausch Rd (JN-6201)
15625 Mayor Dave Way (MP 03-24 #2)
15651 Mayor Dave Way (MP 03-24 #4)
15415 Don Julian Rd
555 El Encanto Rd (MP 07-24)
13900-13910 Lomita Ave
290 San Fidel Ave
747 Anaheim-Puente Rd
1 Industry Hills Pkwy
600 Brea Canyon Rd
208 Waddingham Way
1146 S. Nogales St
19772 Business Parkway
19001 Tonner Canyon Rd (BREA, CA) (MP 00-20)
Additional City-owned parcels:

APN 8269-036-270, 8719-009-915, and 8269-008-270
Services

1. Provide on-call maintenance services for repair or replacement of damaged or missing perimeter fence-related materials.

2. The following items shall be provided on an as-needed basis:
a. Products
i. Chain-link mesh of various gauges and structures.
ii. Fencing support poles and mounting hardware.
iii. Fencing attachments/connections and closing hardware.

Page 54 of 211 ends
Page 13 of 17 ends

iv. Various opening, closing, and locking mechanisms.
v. Posthole digging and concrete pole supports.
vi. Fence attachments include landscape and wind screens. b. Services
i. 24/7 Emergency Service calls.
ii. Temporary patch and repairs services.
iv. Welding support related to fencing repairs and improvements. v. Automated gate services.
c. Materials
i. Non-standard materials costs may vary by request.

Page 55 of 211 ends
Page 14 of 17 ends

EXHIBIT B

RATE SCHEDULE
Service Call Repairs – Typical Repairs
Patch Hole – Chain Link Fence
• Initial trip and Single Hole patch $565.00
• Each additional patch $150.00
Post Replacement or Repair – Chain Link Fence
• Initial trip and Single Post Replacement $565.00
• Each additional post $185.00
Iron Panel Repair
• Fallen Panel Repair $750.00
(includes initial trip and replacement of legs and brackets) • Replace damaged/missing pickets (up to 5) $565.00
Automated Gate Service Calls $565.00
(troubleshoot gate operators)
Labor Costs:
• Initial Trip + First 2 Hours (2 techs) $585.00
• Additional Labor Hour (2 techs) $185.00

Page 56 of 211 ends
Page 15 of 17 ends

EXHIBIT C

INSURANCE REQUIREMENTS
Without limiting Contractor’s indemnification of City, and prior to commencement of the Services, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City.

General liability insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000.00 per occurrence, $2,000,000.00 general aggregate, for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.

Automobile liability insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000.00 combined single limit for each accident.

Professional liability (errors & omissions) insurance. Contractor shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of $1,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this agreement and Contractor agrees to maintain continuous coverage through a period no less than three years after completion of the services required by this agreement.

Workers’ compensation insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000.00).

Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its officers, agents, employees and volunteers.

Proof of insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsement must be approved by City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this contract. City reserves the right to require complete, certified copies of all required insurance policies, at any time.

Duration of coverage. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Services hereunder by Contractor, his agents, representatives, employees or subcontractors.

Page 57 of 211 ends
Page 16 of 17 ends

Primary/noncontributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.

City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Contractor, or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Agreement.

Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VI (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager.

Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors.

Enforcement of contract provisions (non estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of noncompliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.

Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

Notice of cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to City with a thirty (30) day notice of cancellation (except for nonpayment for

Page 58 of 211 ends
Page 17 of 17 ends

which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.

Additional insured status. General liability policies shall provide or be endorsed to provide that City and its officers, officials, employees, and agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess liability policies.

Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing.

Separation of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability.

The policy(ies) shall not contain any cross-liability exclusions.

Pass Through Clause. Contractor agrees to ensure that its subcontractors, subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with Contractors, subcontractors, and others engaged in the project will be submitted to City for review.

City’s right to revise specifications. The City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor’s compensation.

Self-insured retentions. Any self-insured retentions must be declared to and approved by the City. The City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the City.

Timely notice of claims. Contractor shall give the City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.

Additional insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work.

Page 59 of 211 ends

ITEM NO. 6.3

Page 60 of 211 ends

MEMORANDUM
TO: Honorable Mayor and Members of the City Council
FROM: Joshua Nelson, City Manager
STAFF: Mathew Hudson, Director of Public Works
James Cramsie, Sr. Director of Engineering
Arlene Lopez, Sr. Project Manager
DATE: July 23, 2026
SUBJECT: Consideration of authorization to advertise for public bids for Contract No. CITY-1546, Annual Slurry FY25, for an estimated cost of $598,000 (MP 24-05) Background:

Each year, the City maintains certain streets with slurry seal to preserve and protect the underlying pavement structure and provide a new driving surface. The application of slurry seal serves to seal the cracks, which helps in extending the life of the pavement. This project will be implemented as Contract No. CITY-1546 (“Contract”), subject to the approval of the City Council.

Discussion:

The scope of work involves providing all labor, materials, and equipment to slurry seal various city streets. Work will include preparation of pavement surface by crack sealing, removal of existing raised pavement markers, application of surface treatment, and installation of pavement striping and pavement markers. Existing red curb will also be cleaned, prepared, and repainted, with a minimum removal of 80 percent of the existing red paint. In addition to City streets, the Metrolink parking lot will be resurfaced with a seal coat to preserve the pavement. All curbs within the parking lot will be repainted and parking lot striping and pavement markers will be installed.

The project also includes piloting a type of pavement preservation with the application of fiber reinforced slurry seal. This will be applied on two of the streets, Russell Street and Canada Court, and will be observed over the next two to three years for durability compared to other similar street that receive conventional slurry seal. Fiber reinforced slurry seal increases flexibility, which will minimize reflective cracking and therefore will extend the life of the pavement compared to one applied with conventional slurry seal.

Page 61 of 211 ends

The following streets and parking lot are scheduled to be done under this Contract:
• Rausch Road – Mayor Dave Way to Cul de sac
• El Encanto Road – Parriott Place to Proctor Avenue
• Parriott Place West – Proctor Avenue to Don Julian Road • Canada Court – Rowland Street to Cul de sac
• Radecki Court – Rowland Street to Cul de sac
• Ajax Avenue – Rowland Street to Cul de sac
• Curl Court – Rowland Street to Cul de sac
• Russel Street – Valley Boulevard to Cul de sac
• John Reed Court (north of Gale Ave) – Gale Avenue to Cul de sac • John Reed Court (south of Gale Ave) – Gale Avenue to Cul de sac • Evergreen Place – Gale Avenue to Cul de sac
• Johnson Drive – Gale Avenue to Cul de sac
• Green Drive – Gale Avenue to Gale Avenue
• Green Drive – Gale Avenue to Walmart Parking Lot Entrance • Marion Court – Johnson Drive to Cul de sac
• Darius Court – Johnson Drive to Cul de sac
• Bixby Drive – Gale Avenue to Johnson Drive
• Brea Canyon Metrolink Parking Lot
Fiscal Impact:

The estimated cost for this project is $598,000.00.

Recommendation:

It is hereby recommended that the City Council approve the plans and specifications and authorize the solicitation of public bids.

Exhibits:

1. Notice of Inviting Bids

2. Cost Estimate Sheet

3. Section A Pages A-1 through A-8

4. Reduced Set of Project Plans

Page 62 of 211 ends

Contract No. CITY-1546 – Specifications

FOR PUBLICATION
NOTICE INVITING BIDS FOR:

CITY OF INDUSTRY
PROJECT NO. 546
Annual Slurry Seal FY 25
CONTRACT NO. CITY-1546
The CITY OF INDUSTRY, hereinafter referred to as the CITY, will receive bids for the construction of the above project until 10:00 A.M. on Tuesday, September 8, 2026, via the City of Industry’s PlanetBidsTM vendor portal. Bids are to be submitted through https://www.planetbids.com/portal/portal.cfm?CompanyID=29042.

Postmarks, mailed, emailed, or hard copy bids will not be accepted. Late bids will not be accepted.

It is the responsibility of the bidder to be sure the bid is submitted prior to the date and time indicated above. Free digital versions of the plans and specifications are available on the vendor portal. Hard copies are no longer available for purchase.

At the time of submission of the bid and thereafter, each bidder must be licensed as a Class A - General Engineering; C-12 Earthwork and Paving or C-32 Parking and Highway Improvements as defined in Sections 7055-7058 of the Business and Professions Code. Each bidder shall set forth on the Bidder's Information Sheet and the Contractor's License Affidavit the classification and number of the requisite license which that bidder holds.

The CITY reserves the right to award the contract to the contractor with another license class if the CITY determines that the license class is proper for the proposed work.

A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. Please note: It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. Any bids submitted without proof that bidder and any listed subcontractor(s) are currently registered and qualified to perform public work, pursuant to Labor Code Section 1725.5, may not be accepted by the CITY.

ATTACHMENT A

Page 63 of 211 ends

Contract No. CITY-1546 – Specifications
The Scope of Work is as follows: Provide all labor, materials, and equipment to slurry seal various City Streets and seal coat the Metrolink parking lot. Work will include preparation of surface by crack sealing. Installation of pavement striping and pavement markers and existing red curb will be repainted after a minimum 80% removal of existing paint and surface preparation.

Online Questions and Answers will be due via the City of Industry’s PlanetBidsTM vendor portal on Friday, August 28, 2026 at 5:00 P.M.

Page 64 of 211 ends

Contract No. CITY-1546 – Specifications

CITY OF INDUSTRY
PROJECT NO. 546
Annual Slurry Seal FY 25
CONTRACT NO. CITY-1546
Each bid shall be accompanied by a bid guarantee in the form of a Cashier's Check or Bidder's Bond for not less than ten percent (10%) of the total amount of the bid, made payable to the CITY OF INDUSTRY.

The contractor may, at his own expense, substitute securities for monies to be withheld to ensure performance under the contract.

By the order of the CITY OF INDUSTRY dated Thursday, July 23, 2026 Julie Gutierrez- Robles, City Clerk

Page 65 of 211 ends

ESTIMATE FOR:

CITY OF INDUSTRY
PROJECT NO. 546
Annual Slurry Seal FY 25
CONTRACT NO. CITY-1546

ENGINEER'S ESTIMATE
$598,000.00

ATTACHMENT B

Page 66 of 211 ends

Contract No. CITY-1546 – Specifications A-1

SECTION A

CITY OF INDUSTRY
PROJECT NO. 546
Annual Slurry Seal FY 25
CONTRACT NO. CITY-1546
The CITY OF INDUSTRY, hereinafter referred to as the CITY, will receive bids for the construction of the above project until 10:00 A.M. on Tuesday, September 28, 2026, via the City of Industry’s PlanetBidsTM vendor portal. Bids are to be submitted through https://www.planetbids.com/portal/portal.cfm?CompanyID=29042.

Postmarks, mailed, emailed, or hard copy bids will not be accepted. Late bids will not be accepted.

It is the responsibility of the bidder to be sure the bid is submitted prior to the date and time indicated above. Free digital versions of the plans and specifications are available on the vendor portal. Hard copies are no longer available for purchase.

At the time of submission of the bid and thereafter, each bidder must be licensed as a Class A - General Engineering; C-12 Earthwork and Paving or C-32 Parking and Highway Improvements as defined in Sections 7055-7058 of the Business and Professions Code. Each bidder shall set forth on the Bidder's Information Sheet and the Contractor's License Affidavit the classification and number of the requisite license which that bidder holds.

The CITY reserves the right to award the contract to the contractor with another license class if the CITY determines that the license class is proper for the proposed work.

A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. Please note: It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. Any bids submitted without proof that bidder and any listed subcontractor(s) are currently registered and qualified to perform public work, pursuant to Labor Code Section 1725.5, may not be accepted by the CITY.

The Scope of Work is as follows: Provide all labor, materials, and equipment to slurry seal various City Streets and seal coat the Metrolink parking lot. Work will include preparation of surface by crack sealing. Installation of pavement striping and pavement markers and existing red curb will be repainted after a minimum 80% removal of existing paint and surface preparation.

ATTACHMENT C

Page 67 of 211 ends

Contract No. CITY-1546 – Specifications A-2
Online Questions and Answers will be due via the City of Industry’s PlanetBidsTM vendor portal on Friday, August 28, 2026 at 5:00 P.M.

The bid shall be accompanied by a bid guarantee in the form of a Cashier's Check or Bidder's Bond for not less than ten percent (10%) of the total amount of the bid, payable to the CITY OF INDUSTRY. The bid guarantee is to insure that the bidder, if awarded the work, will enter into a contract with the CITY. Failure of a contractor to enter into a contract within ten (10) days following award will cause the bid guarantee to be forfeited.

If the bid guarantee is a Cashier’s Check it must be delivered to City Hall prior to the bid opening date and time. The Cashier’s Check shall be sealed in an envelope, endorsed as follows: CITY-1546 - Annual Slurry Seal FY 25, City of Industry City Hall, 15625 Mayor Dave Way, City of Industry, California 91744. If a bid bond is chosen, a scanned PDF will be accepted through PlanetBidsTM, however, the three apparent low bidders will be contacted to submit the original bid bond and signed bid package to the CITY and will be given a deadline to submit.

The CITY may, upon refusal or failure of a successful responsible bidder to accept the contract, award it to the next lowest bidder. If the CITY awards the contract to the second lowest bidder, the amount of the lowest bidder's bid guarantee shall be applied by the CITY to the difference between the low bid and the second lowest bid; the surplus, if any, shall be returned to the lowest bidder if cash is used, or to the surety company if a bond is used.

The successful bidder will be required to furnish a labor and materials bond in an amount equal to one hundred percent (100%) of the contract price and a faithful performance bond in an amount equal to one hundred percent (100%) of the contract price.

A maintenance bond equal to ten percent (10%) of the total bid price amount is to remain in force for one (1) year after the date of completion of work, shall be submitted prior to execution of contract The above bonds shall be secured by a surety company satisfactory to the CITY, and licensed as a Surety Insurer in the State of California and rated at least B+:V in the latest "Best's Insurance Guide." The attached bond forms shall be used without exception.

CONTRACTOR

INSURANCE
Prior to the beginning of and throughout the duration of the Project, Contractor and its subcontractors shall maintain insurance in conformance with the requirements set forth below. Contractor will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth herein, Contractor agrees to amend, supplement or endorse the existing coverage to do so.

Contractor acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to Contractor or its subcontractors in excess of the limits and coverage identified

Page 68 of 211 ends

Contract No. CITY-1546 – Specifications A-3
in this Agreement and which is applicable to a given loss, claim or demand, will be equally available to the CITY.

Contractor shall provide the following types and amounts of insurance:

Without limiting Contractor’s indemnification of CITY, and prior to commencement of the Project, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to the CITY.

General Liability Insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $5,000,000 per occurrence, $10,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $5,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.

Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.

Umbrella or Excess CGL Insurance. If the CONTRACTOR elects to include an umbrella or excess policy to cover any of the total limits required beyond the primary commercial general liability (“CGL”) policy limits and/or the primary commercial automobile liability policy limits, then the policy must include the following:
• The umbrella or excess policy shall follow form over the CONTRACTOR's primary general liability coverage and shall provide a separate aggregate limit for products and completed operations coverage.
• The umbrella or excess policy shall not contain any restrictions or exclusions beyond what is contained in the primary policy.
• The umbrella or excess policy shall contain a clause stating that it takes effect (drops down) in the event the primary limits are impaired or exhausted. • The umbrella or excess policy must also extend coverage over the automobile policy if it is to be used in combination with the primary automobile policy to meet the total insurance requirement limits.

Workers’ Compensation Insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for Contractor ’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s

Page 69 of 211 ends

Contract No. CITY-1546 – Specifications A-4
Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.

Contractor shall submit to the CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the CITY, its officers, agents, employees and volunteers.

Pollution Liability Insurance. Environmental Impairment Liability Insurance shall be written on a Contractor’s Pollution Liability form or other form acceptable to the CITY providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.

Completed Operations Coverage. Products/completed operations coverage shall extend a minimum of ten years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The CITY, its officials, officers, agents, and employees, shall be included as insureds under the policy.

Other provisions or requirements:

Proof of Insurance. Contractor shall provide certificates of insurance to the CITY as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by the CITY's risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with the CITY at all times during the term of this contract. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time.

Duration of Coverage. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the work hereunder by Contractor, his agents, representatives, employees or subcontractors. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. The CITY and its officers, officials, employees, and agents shall continue as additional insureds under such policies.

Primary/Noncontributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by the CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess

Page 70 of 211 ends

Contract No. CITY-1546 – Specifications A-5
insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of the CITY before the CITY's own insurance or self-insurance shall be called upon to protect it as a named insured.

CITY’s Rights of Enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, the CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by the CITY will be promptly reimbursed by Contractor or the CITY will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, the CITY may cancel this Agreement.

Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY's risk manager.

Waiver of Subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against CITY, and shall require similar written express waivers and insurance clauses from each of its subconsultants.

Enforcement of Contract Provisions (non estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform Contractor of non-compliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder.

Requirements Not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY.

Notice of Cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.

Page 71 of 211 ends

Contract No. CITY-1546 – Specifications A-6
Additional Insured Status. General liability policies shall provide or be endorsed to provide that CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.

Prohibition of Undisclosed Coverage Limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to CITY and approved of in writing.

Separation of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.

Pass Through Clause. Contractor agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to CITY for review.

CITY’s Right to Revise Requirements. The CITY reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor a ninety (90)-day advance written notice of such change. If such change results in substantial additional cost to the Contractor, the CITY and Contractor may renegotiate Contractor’s compensation.

Self-insured Retentions. Any self-insured retentions must be declared to and approved by CITY. CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the CITY.

Timely Notice of Claims. Contractor shall give CITY prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.

Additional Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work.

EXPERIENCE AND SAFETY
The successful bidder may be required to submit a statement attesting to its financial responsibility, technical ability, experience, and safety record.

Page 72 of 211 ends

Contract No. CITY-1546 – Specifications A-7

PREVAILING WAGES
A. Wage rates for this Project shall be in accordance with the “General Wage Determination Made by the Director of Industrial Relations Pursuant To California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773 and 1773.1 ", for Los Angeles County. Wage rates shall conform to those on file at City Hall and the Project site.

B. The following Labor Code sections are hereby referenced and made a part of this Agreement:
(i) Section 1775, Penalty for Failure to Comply with Prevailing Wage Rates.
(ii) Section 1777.4, Apprenticeship Requirements.
(iii) Section 1777.5, Apprenticeship Requirements.
(iv) Section 1813, Penalty for Failure to Pay Overtime. (v) Section 1810 and 1811, Working Hour Restrictions.
(vi) Section 1775, Payroll Records.
(vii) Section 1773.8, Travel and Subsistence Pay.

CONTRACTOR REGISTRATION PROGRAM
A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. Please note: It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. Any bids submitted without proof that bidder and any listed subcontractor(s) are currently registered and qualified to perform public work, pursuant to Labor Code Section 1725.5, may not be accepted by the CITY.

LABOR COMPLIANCE MONITORING AND ENFORCEMENT
The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (California Labor Code Section 1771.4).

Page 73 of 211 ends

Contract No. CITY-1546 – Specifications A-8

AGREEMENT
When the award of a contract is made to a corporation, the Agreement must be signed by the Secretary/Treasurer of the corporation in addition to the signature of the President/Vice President, or the public agency needs to receive a copy of a resolution adopted by the Board of Directors of the corporation indicating that the party executing the contract has the authority to bind the corporation.

SURETY BONDS
All surety bonds issued in connection with projects for public works must be accompanied by a power of attorney from the surety company authorizing the person executing the bond to sign on behalf of the company. The power of attorney and the bonds must be executed by the same person, and such signatures shall be notarized.

By the order of the CITY OF INDUSTRY dated Thursday, July 23, 2026 Julie Gutierrez- Robles, City Clerk

Page 74 of 211 ends
Page 75 of 211 ends
Page 76 of 211 ends
Page 77 of 211 ends
Page 78 of 211 ends
Page 79 of 211 ends
Page 80 of 211 ends
Page 81 of 211 ends
Page 82 of 211 ends
Page 83 of 211 ends
Page 84 of 211 ends
Page 85 of 211 ends
Page 86 of 211 ends
Page 87 of 211 ends
Page 88 of 211 ends

ITEM NO. 6.4

Page 89 of 211 ends

MEMORANDUM
TO: Honorable Mayor and Members of the City Council
FROM: Joshua Nelson, City Manager
STAFF: Bing Hyun, Asst. City Manager
Kathy Tai, Dev. Services Manager
DATE: July 23, 2026
SUBJECT: Consideration of Amendment No. 1 to the Professional Services Agreement with Fehr & Peers for On-call Transportation Planning and Analysis Services extending the term through June 30, 2031 and updating the rate schedule Background:

On June 25, 2020, the City Council adopted Resolution No. CC 2020-20, establishing Vehicle Miles Traveled (“VMT”) thresholds of significance in conformance with Senate Bill 743 and the California Environmental Quality Act (“CEQA”) Guidelines. The VMT methodology replaced the previous Level of Service (“LOS”) approach for analyzing transportation impacts associated with development projects subject to CEQA. To support implementation of these requirements, on October 28, 2021, the City Council approved a Professional Services Agreement with Fehr & Peers to provide transportation planning and analysis services.

Discussion:

Fehr & Peers has served as the City’s VMT transportation planning consultant for the past five years, providing professional and responsive transportation planning and analysis services in support of the City’s implementation of VMT requirements. The proposed amendment will extend the Agreement through June 30, 2031 and update the rate schedule.

Fiscal Impact:

The fiscal impact depends on the work assignments. Most of Fehr & Peers’ work will support developer applications, with costs fully reimbursed by project applicants. For City projects requiring VMT-related services, costs will be paid by the applicable project funding sources, such as General Fund or special funds.

Recommendation:

Staff recommends that the City Council approve Amendment No. 1.

Page 90 of 211 ends

Exhibits:

1. Fehr & Peers Amendment No. 1

Page 91 of 211 ends

1 AMENDMENT NO. 1

TO PROFESSIONAL SERVICES AGREEMENT WITH

FEHR & PEERS
This Amendment No. 1 to the Professional Services Agreement (“Agreement”), is made and entered into this 1st day of July 2026 (“Effective Date”), by and between the City of Industry, a California municipal corporation (“City”) and Fehr & Peers, a California corporation (“Consultant”). The City and Consultant are hereinafter collectively referred to as the “Parties”.

RECITALS
WHEREAS, on or about October 28, 2021, the Agreement was entered into and executed between the City and Consultant for On-call Transportation Planning and Analysis Services; and
WHEREAS, the Parties desire to amend the Agreement to update the rate schedule and extend the term through June 30, 2031; and WHEREAS, for the reasons set forth herein, the City and Consultant desire to enter into this Amendment No. 1, as set forth below.

AMENDMENT
NOW, THEREFORE, in consideration of the mutual covenants, promises and agreements set forth herein, it is agreed the aforesaid Agreement, and incorporated herein by reference, shall remain in full force and effect except as otherwise hereinafter provided:

Section 1. TERM
This section is hereby amended to read in its entirety as follows:

This Agreement shall commence on the Effective Date, and shall remain and continue in effect until tasks described herein are completed, but in no event later than June 30, 2031, unless sooner terminated pursuant to the provisions of this Agreement.

EXHIBIT B RATE SCHEDULE
The Rate Schedule is hereby rescinded in its entirety and replaced with the rates set forth in Attachment No. 1 attached hereto, and incorporated herein by reference.

The person or persons executing this Agreement on behalf of Consultant represents and warrants that he/she has the authority to execute this Agreement on behalf of the Consultant and has the authority to bind Consultant to the performance of its obligations hereunder.

Page 92 of 211 ends

2 IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 1 to be executed as of the Effective Date.
“CITY” “CONSULTANT”
City of Industry Fehr & Peers
By: ________________________________ By: _____________________________ Joshua Nelson, City Manager John Muggridge, Principal
Attest:

By: ____________________________________
Julie Gutierrez-Robles, City Clerk

APPROVED AS TO FORM
By: ________________________________
James M. Casso, City Attorney

Page 93 of 211 ends

3 ATTACHMENT NO. 1

EXHIBIT B

RATE SCHEDULE

Page 94 of 211 ends

ITEM NO. 6.5

Page 95 of 211 ends

MEMORANDUM
TO: Honorable Mayor and Members of the City Council
FROM: Joshua Nelson, City Manager
STAFF: Mathew Hudson, Director of Public Works
Sean Calvillo, Director of Operations
DATE: July 23, 2026
SUBJECT: Consideration of a Sewer System Management Plan, and Adoption of a Notice of Exemption regarding same
Background:

On December 6, 2022, the State Water Resources Control Board (SWRCB) adopted Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems, Water Quality Order No. 2022-0103-DWQ (Sanitary Sewer Systems WDR). The Sanitary Sewer Systems WDR requires public agencies that own and/or operate sanitary sewer systems to:
• Comply with Federal and State prohibitions of discharge of sewage to waters of the State, including Federal waters of the United States
• Comply with specifications and notification, monitoring, reporting, and recordkeeping requirements
• Proactively operate and maintain resilient sanitary sewer systems to prevent spills • Eliminate discharges of sewage to Waters of the State through effective implementation of a Sewer System Management Plan
• Monitor, track, and analyze spills for ongoing system-specific performance improvements.

The regulations were put in place to ensure that publicly owned sanitary sewer collection systems in the State of California with more than one mile of infrastructure are well managed, operated, and maintained to prevent or significantly minimize the occurrence of sanitary sewer overflows.

Pursuant to the SWRCB Sanitary Sewer Systems WDR, the City is required to present the SSMP to the City Council for readoption every six years following the date of its original approval or whenever there is a significant change in the document. The SSMP was initially

Page 96 of 211 ends

adopted by the City Council in 2009. The City Council last recertified the SSMP on December 12, 2019. The City Council’s adoption of the SSMP will satisfy the SWRCB’s recertification requirements, due August 2, 2026.

Discussion:

Staff worked with Los Angeles County Consolidated Sewer Maintenance District (“CSMD”) on updating the Sewer System Management Plan for 2026. Upon City Council approval, the SSMP will be implemented. The goal of the SSMP is to ensure that the City’s sewer system is cost effective, well managed, operated and maintained in order to reduce sanitary sewer overflows and protect public health and the environment. The SSMP covers topics that include the City’s legal authority to regulate the sewer system and its users, establish an operation and maintenance program, provide design and performance guidelines, execute an overflow emergency response plan, enforce a sewer pipe blockage control program that regulates the fat, oil and grease discharged by food service/restaurant operations, provide a monitoring program and provide public access to the SSMP.

CSMD carries out the maintenance program for the City’s nearly 50 miles of sanitary sewers.

The City’s sewer system mostly ranges in size from 8 inches to 18 inches in diameter, but up to 36 inches diameter. CSMD implements system specific procedures to proactively prioritize operations and maintenance, condition assessments and repair, and rehabilitation to address system resilience.

City Staff has determined that this project is subject to review under the California Environmental Quality Act (“CEQA”), however, it is exempt pursuant to Sections 15301 (maintenance of existing facilities) and 15308 (actions take to assure the maintenance/protection of the environment) of the CEQA Guidelines. As set forth above, the Los Angeles County Department of Public Works is responsible for all operation and maintenance activities of the City’s sewer collection system. The City is not responsible for any operation, maintenance or construction activities related to the system. Further, the plan does not explicitly commit the City to future construction or maintenance activities. Pursuant to Section 15308 of the CEQA Guidelines, actions taken by regulatory agencies to assure the maintenance, restoration, enhancement, or protection of the environment where the regulatory process involves procedures for protection of the environment, are exempt from CEQA. Under the instant circumstances, the SSMP is mandated by the State Water Board to minimize future sewer system overflows in the City, thereby reducing water quality issues that could pose serious health and safety issues. Given that the SSMP is adopted for the purpose of protecting the environment, it is exempt under Section 15308. Further, because the SSMP applies to an existing sanitary collection system, and its implementation may result in the repair or replacement of existing systems involving negligible or no expansion of capacity, the SSMP is exempt from CEQA pursuant to Section 15301 of the CEQA Guidelines. Based on the foregoing, Staff is recommending that the City Council adopt a Notice of Exemption for the Sewer System Management Plan.

Fiscal Impact:

There are no additional costs associated with the 2026 Sewer System Management Plan approval. Sewer maintenance funds are handled through the County’s Consolidated Sewer

Page 97 of 211 ends

Maintenance District’s budget.

Recommendation:

Staff recommends that the City Council approve the 2026 Sewer System Management Plan, adopt a Notice of Exemption for the Plan, and permit the Director of Public Works to make minor revisions to the Plan, as necessary.

Exhibits:

1. 2026 Sewer System Management Plan

2. Notice of Exemption, dated July 23, 2026

Page 98 of 211 ends

Sewer System
Management Plan
2026 SSMP Update
City of Industry / Los Angeles County Public
Works
Los Angeles, California
FINAL - July 31, 2026

Page 99 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
FINAL - July 31, 2026 | i
Contents
1 Goal and Introduction..........................................................................................................................1

1.1 Regulatory Context ...................................................................................................................1

1.2 SSMP Goal and System Management Objectives....................................................................4

1.3 SSMP Update Schedule ...........................................................................................................5

1.4 Sewer System Asset Overview .................................................................................................8

1.4.1 Access to Up-to-Date Mapping ..................................................................................12

1.5 SSMP Overview ......................................................................................................................12 2 Organization......................................................................................................................................13

2.1 Overview .................................................................................................................................13

2.2 Authorized Representatives ....................................................................................................16

2.3 Positions Responsible for Implementing Specific SSMP Elements ........................................19

2.3.1 Positions Responsible................................................................................................19

2.3.2 Lines of Authority........................................................................................................19

2.4 Spill Reporting Chain of Communication ................................................................................22 3 Legal Authority ..................................................................................................................................24

3.1 Overview .................................................................................................................................24

3.2 Authority to Prevent Illicit Industrial Waste Discharges into the Collection System ................26

3.2.1 Prevention of Illicit Discharge of FOG ........................................................................26

3.2.2 Prevention of Illicit Discharge of Infiltration/Inflow......................................................26

3.3 Authority to Collaborate with Storm Sewer Agencies..............................................................26

3.4 Authority to Require Proper Design and Construction of Sewers ...........................................27

3.5 Authority to Ensure Access to Publicly Owned Portion of Lateral...........................................27

3.6 Limit the Authority to Discharge of FOG and other Debris......................................................27

3.7 Authority to Obtain Easement Accessibility Agreements When Applicable............................27 4 Operation and Maintenance Program ...............................................................................................29

4.1 Up-to-Date Map of the Collection System...............................................................................29

4.1.1 Procedures for Maintaining and Providing Access to Water Boards Staff .................29

4.1.2 Availability of Up-to-Date Mapping to Support Collection System Management ..............................................................................................................32

4.2 Preventive Maintenance Program...........................................................................................33

4.2.1 CCTV Inspection........................................................................................................33

4.2.2 Sewer Line and Manhole Visual Inspection ...............................................................34

4.2.3 Gas Trap Manholes and Siphons...............................................................................34

4.2.4 Drop Manholes...........................................................................................................34

4.2.5 Sewer Line Cleaning..................................................................................................34

4.2.6 Root Foaming.............................................................................................................34

4.2.7 Periodic Maintenance.................................................................................................34

4.2.8 Vermin and Odor Control ...........................................................................................34

4.2.9 Treatment Plants and Pumping Stations....................................................................35

4.3 Scheduling and Data Collection..............................................................................................35

4.4 Training ...................................................................................................................................35

4.5 Equipment Inventory ...............................................................................................................36

Page 100 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
FINAL - July 31, 2026 | ii
5 Design and Performance Provisions.................................................................................................38

5.1 Design and Construction Standards and Specifications .........................................................38

5.2 Procedures and Standards for Inspecting and Testing System Improvements ......................38 6 Spill Emergency Response Plan.......................................................................................................40

6.1.1 Pre-Planned Coordination with Other Agencies or Departments...............................40 7 Sewer Pipe Blockage Control Program.............................................................................................41

7.1 Program Overview ..................................................................................................................41

7.2 Implementation Plan and Schedule for Public Outreach.........................................................41

7.2.1 Summary of Outreach Activities.................................................................................41

7.2.2 Plan and Schedule of Events .....................................................................................42

7.3 Plan and Schedule for Disposal of FOG .................................................................................42

7.4 Authority to Prohibit FOG Discharges and Identify Measures to Prevent FOG Spills.............42

7.4.1 Authority .....................................................................................................................42

7.4.2 Preventative Measures ..............................................................................................42

7.5 FOG Program Requirements and Design Standards..............................................................43

7.5.1 Requirements to Install Grease Removal Devices.....................................................43

7.5.2 Design Standards for Grease Removal Devices........................................................43

7.5.3 Maintenance Requirements .......................................................................................44

7.5.4 Best Management Practices Requirements...............................................................44

7.5.5 The Pretreatment Guidelines for Restaurants and Food Service Operations provide guidelines and best management practices for selecting and installing pretreatment devices. These guidelines outline the installation requirements for grease interceptors and offer a list of alternative pretreatment devices that can be used in lieu of a grease interceptor.......................44

7.5.6 Record Keeping and Reporting Requirements ..........................................................44

7.5.7 Procedures.................................................................................................................44

7.6 Inspection and Enforcement Program.....................................................................................45

7.6.1 Authority to Inspect Grease Producing Facilities .......................................................45

7.6.2 Authority to Enforce....................................................................................................45

7.6.3 Resource Plan to Inspect and Enforce.......................................................................46

7.7 Maintenance Program to Address FOG Issues ......................................................................46

7.8 Implementation of Source Control Measures to Address FOG Issues ...................................46

7.8.1 Summary of Source Control Measures ......................................................................46

7.8.2 Summary of Source Control Program Enforcement...................................................46 8 System Evaluation, Capacity Assurance and Capital Improvements ...............................................48

8.1 System Evaluation and Condition Assessment.......................................................................48

8.1.1 Best Practices and New Technology .........................................................................48

8.1.2 Amount of System Condition Assessment.................................................................48

8.1.3 Inspection and Condition Assessment Prioritization ..................................................48

8.1.4 Inspection Methods ....................................................................................................49

8.1.5 Utilizing Observations for Condition Assessment ......................................................49

8.1.6 Inspection and Assessment Recordkeeping..............................................................50

8.1.7 Assessing Assets Vulnerable to Climate Change......................................................50

8.2 Capacity Assessment and Design Criteria..............................................................................51

8.2.1 Gravity Facilities.........................................................................................................51

8.2.2 Pressure Facilities......................................................................................................51

8.2.3 Infiltration and Inflow ..................................................................................................52

8.2.4 Erosive Forces in Canyons and Streams...................................................................52

8.2.5 Design Flow and Weather Events..............................................................................52

8.2.6 Capacity Assessment Data........................................................................................52

Page 101 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
FINAL - July 31, 2026 | iii

8.2.7 Capacity Enhancement Plan......................................................................................53

8.3 Prioritization of Corrective Actions ..........................................................................................53

8.4 Capital Improvement Plan.......................................................................................................53

8.4.1 Accumulative Capital Outlay Program .......................................................................54

8.4.2 Joint Coordination and Interagency Coordination......................................................54 9 Monitoring, Measurement and Program Modifications......................................................................55

9.1 Maintenance of Information to Prioritize SSMP Activities .......................................................55

9.2 Monitoring of Implementation and Effectiveness of the SSMP ...............................................57

9.3 Program Audits .......................................................................................................................57

9.4 Assessment of Preventative Maintenance Program ...............................................................57

9.5 Identification and Illustration of Spill trends.............................................................................57

9.6 Approach to Program Modifications and Plan Updates ..........................................................58 10 SSMP Program Audits ......................................................................................................................59

10.1 Schedule of Program Audits and Updates ..............................................................................59

10.2 SSMP Audit Process...............................................................................................................60

10.3 SSMP Audit Report.................................................................................................................60

10.4 Audit Implementation and Tracking of Results........................................................................60 11 Communication Program ..................................................................................................................61

11.1 Procedures to Communicate with Public for Spills and Discharges........................................61

11.2 Procedures for General Communication with Public on SSMP ..............................................61

11.3 Procedures to Communicate with Connecting Systems and Contract Agencies....................62 Tables
Table 1-1: Summary of General Order Requirements..................................................................................1 Table 1-2: LACDPW Sewer-Related Services to the 38 CSMD Cities1........................................................3 Table 1-3: SSMP Audit and Update Schedule..............................................................................................5 Table 1-4: Planned SSMP Implementation Milestones Addressing Prevention of Sewer Spills...................7 Table 2-1: Collection Systems Operated, Maintained and Managed by Los Angeles County Public Works.............................................................................................................................................17 Table 2-2: Positions Responsible for SSMP...............................................................................................19 Table 3-1: Summary of Legal Authorities Relating Legal Authority Element of General Order ..................25 Table 3-2: Summary of Legal Authorities Relating Sewer Pipe Blockage Control Program Element of General Order............................................................................................................................25 Table 4-1: Summary of Training Program...................................................................................................36 Table 4-2: List of Major Equipment.............................................................................................................37 Table 6-1: Spill Emergency Response Plan General Order Compliance ...................................................40 Table 8-1: ACO Program Contract List.......................................................................................................54 Table 9-1: Information Systems Relevant to SSMP Implementation and Monitoring.................................56 Table 10-1: SSMP Audit and Update Schedule..........................................................................................59

Page 102 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
FINAL - July 31, 2026 | iv
Figures
Figure 1-1: City and CSMD Service Area Map...........................................................................................10 Figure 2-1: City and LACPWs Organizational Chart...................................................................................20 Figure 2-2a: SMD Organizational Chart......................................................................................................21 Figure 2-2b: City Organizational Chart .......................................................................................................21 Figure 2-3: Spill Reporting Chain of Communication – Normal Business Hours........................................22 Figure 2-4: Spill Reporting Chain of Communication – After Hours............................................................23 Figure 4-1: Sewer Network Map.................................................................................................................30 Figure 4-2: Sewer Plans Webpage.............................................................................................................31 Figure 4-3: Operations Map Overview Map................................................................................................32 Appendices
Appendix A1 - Governing Board Approval
Appendix A2 – State Water Resources Control Board - General Order for Sanitary Sewer Systems Appendix A3 – Asset Summary Per Collection System
Appendix B1 – List of Staff Responsible for Implementing Specific Elements of the SSMP Appendix B2 – City and Sewer Maintenance Division Staff Contact Sheet Appendix C – Not Used
Appendix D – LACPWs Field Operations Yard and Pump Station Map Appendix E – Not Used
Appendix F – Spill Emergency Response Plan
Appendix G – IDWP Conditions and Limitations
Appendix H – Not Used
Appendix I – Not Used
Appendix J – Not Used
Appendix K – Not Used

Page 103 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
FINAL - July 31, 2026 | v
Acronyms
Acronym Definition
ACO Accumulative Capital Outlay
BMP Best Management Practices
BSD Building and Safety Division
CCTV Closed Circuit Television
CAD Computer-Aided Design and Drafting
CALOSHA California Occupational Safety and Health Administration CAP Condition Assessment Program
CIP Capital Improvement Plan
CIPP Cured-In-Place Pipe
CIWQS California Integrated Water Quality System
CGRG Community and Government Relations Group
CS Collection System
CSMD Consolidated Sewer Maintenance District
CWEA California Water Environment Association
EPD Environmental Programs Division
FOG Fats, Oils and Grease
FSE Food Service Establishment
GI Grease Interceptor
GIS Geographic Information System
GRD Grease Removal Device
IBEW International Brotherhood of Electrical Workers
I/I Infiltration and Inflow
IWDP Industrial Waste Disposal Permit
LACO Los Angeles County Ordinance
LACPW Los Angeles County Public Works
LACSD Los Angeles County Sanitation Districts
LDD Land Development Division
LRO Legally Responsible Official
LVMWD Las Virgenes Municipal Water District
MMS Maintenance Management System
MSMD Marina Sewer Maintenance Division
NASSCO National Association of Sewer Service Companies
PACP Pipeline Assessment and Certification Program
PM Periodic Maintenance

Page 104 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
FINAL - July 31, 2026 | vi
Acronym Definition
PMD III Project Management Division III
SCADA Supervisory Control and Data Acquisition System
SERP Spill Emergency Response Plan
SMD Sewer Maintenance Division
SSMP Sewer System Management Plan
SWRCB State Water Resources Control Board
WDR Wastewater Discharge Requirements

Page 105 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
FINAL - July 31, 2026 | vii
This page is intentionally left blank.

Page 106 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 1
1 Goal and Introduction

1.1 Regulatory Context
The City of Industry (“City”), along with Los Angeles County Public Works (“LACPW”), has prepared this updated Sewer System Management Plan (“SSMP”) pursuant to the State Water Resources Control Board (“SWRCB”) December 6, 2022, Statewide Sanitary Sewer Systems General Order 2022- 0103-DWQ (“General Order”). This SSMP provides a management plan for the City and Los Angeles County Department of Public Works (“PW”), which administers the Sewer Maintenance Districts (“Districts”) in Los Angeles County, responsible for operating and maintaining the Consolidated Sewer Maintenance District (“CSMD”) collection system, of which the City is a member.

Table 1-1 summarizes the General Order requirements addressed by this SSMP1. These requirements are defined by General Order specifications and associated General Order attachments. All agencies that own and operate collection systems greater than one mile in length must comply with these requirements.

Table 1-1: Summary of General Order Requirements
Specification Description Linkage to SSMP

5.2 SSMP
Development and
Implementation
Requires development and implementation of a SSMP
Entire SSMP

5.3 Certification of
SSMP and Plan
Updates
Requires City to certify and upload the SSMP to CIWQS
Entire SSMP

5.5 Six-Year SSMP
Update
Requires update of the SSMP every 6 years, at a
minimum. Requires governing board approval of SSMP.

Requires City to certify and upload SSMP to CIWQS.

Entire SSMP

5.6 System Resilience Requires LACPW to include and implement systemspecific procedures to proactively prioritize operations and maintenance, condition assessments and repair and
rehabilitation to address system resilience
D.4 Operations and
Maintenance
D.8 System Evaluation,
Capacity Assurance
and Capital Planning

5.10 System Capacity Requires City to maintain system capacity to convey dry weather and forecasted wet weather flows
D.8 System Evaluation,
Capacity Assurance
and Capital Planning

5.19 Operation and
Maintenance
Requires City and LACPW to maintain in good working
order and operate as design any facilities, treatment or control systems design to contain and convey sewer.

D.4 Operations and
Maintenance
D.8 System Evaluation,
Capacity Assurance
and Capital Planning
1 Summarized from the SWRCB Order No. 2022-0103-DWQ Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems

Page 107 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 2
This document serves as the 2026 update to the SSMP approved and adopted by the City Council at a public meeting on July 23, 2026. Appendix A1 includes documentation of approval by the City Council. Appendix A2 includes the General Order.

The sewer-related services that the Districts provide vary from city to city depending on the service agreements. Table 1-2 summarizes the CSMD cities and the sewer-related services currently provided by the LACPW to the City. LACPW applied for coverage under the reissued General Order for facilities it owns, and the CSMD member cities applied for coverage under the reissued General Order for facilities they own. LACPW and the member cities own the sewer mainlines and the point of connection to the sewer mainlines, but do not own any portion of the sewer lateral beyond the sewer connection.

LACPW, as operator of the CSMD, prepares and updates the SSMP for activities LACPW perform for managing, operating, and maintaining sewer systems including the Districts.

The City, as well as the other County departments serviced by CSMD, as owners of their respective system, are responsible for preparing and updating an SSMP specific to the collection system owned by those entities. The City is responsible for implementing the legal authorities required by the General Order and also are responsible for conducting capacity studies of their collection system when necessary and correcting identified hydraulic deficiencies. The CSMD performs functions required by the General Order related to the operation and maintenance of sanitary sewer systems.

A pdf copy of this SSMP is available on the internet at:

LACPW:
https://pw.lacounty.gov/core-service-areas/environmental-services/sewermaintenance/reports-documents/#sewer-system-management-plan City of Industry:
https://www.cityofindustry.org/179/Sewer-System-Management-Plan Table 1-2: LACDPW Sewer-Related Services to the City1
City CSMD ACO
Program
Sewer Maintenance
Agreement
Building and
Safety
Industrial
Waste
City
Engineers
Industry X X X
1Through the General Services Agreement, a city can request LACPW resources upon specific request. LACDPW currently provides at least some degree of service to all 88 cities in the County of Los Angeles.

1.2 SSMP Goal and System Management Objectives
The goal of the SSMP is to provide a plan and schedule to properly manage, operate, and maintain all parts of the collection system. This will help reduce and prevent spills, as well as mitigate any spills that do occur. The City and LACPW has adopted and is dedicated to achieving the following collection system management objectives:
• Proper operation, maintenance, and management of the Districts’ sanitary sewer collection system facilities to reduce the frequency and severity of sewer spills and their potential impacts on public health, safety, and the environment.

Page 108 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 3
• Prompt action when sewer spills occur to identify, contain, and remove the cause, promptly report the event to appropriate regulatory authorities, and ensure the public is adequately and timely notified.
• Document all sewer spills and system deficiencies and the remedial actions taken. • Adequately train and equip the Districts’ sewer system operators, employees, contractors, responders, or other agents to address a sewer spill event. • Maintain and repair the Districts’ sewer system to provide adequate capacity to convey base flows and peak flows while meeting or exceeding applicable regulations, laws, and generally accepted practices relative to sanitary sewer system operations and maintenance.

This SSMP documents how the City and LACPWs collection system practices are integrated toward the achievement of the City’s and LACPWs objectives. The City’s and LACPW have identified the following actions to be taken under this SSMP to ensure the accomplishment of these goals:
• Conduct a planned and scheduled maintenance program that will minimize the risk and occurrence of sewer spills, in support of the SSMP goals. • When sewer spills do occur, respond to the reported site in a timely manner and undertake feasible remedial actions to contain the spill to minimize impacts, including stopping the flow from reaching the storm drain, if possible. • Stop the spill as soon as possible and limit public access to the spill area to prevent public contact with any wastewater contamination.
• Recover the spill to the extent feasible and return it to the sewer system and then clean up the contaminated area.
• Gather and compile all pertinent information regarding the spill event, investigate as necessary to determine probable cause, document findings, report to the appropriate regulatory agencies in a timely manner, and file the completed report.

1.3 SSMP Update Schedule
Pursuant to the General Order, CSMD conducts program monitoring and triennial audits of its SSMP, prepares SSMP updates, and implements planned activities to achieve the City’s and LACPWs collection system program objectives. The City’s SSMP update was prepared upon completion of the most recent SSMP Program Audit, dated January 15, 2026, and LACPWs SSMP update.

The schedule for auditing and updating this SSMP is provided in Table 1-3. Element 10 of the SSMP includes a longer-term schedule for SSMP audits and updates.

Table 1-3: SSMP Audit and Update Schedule
Activity Collection System Name SSMP Audit
Due Date
SSMP Update
Due Date
CSMD – City City of Industry 2/2/2026 8/2/2026

Page 109 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 4
LACPW plans to complete implementation of several significant initiatives addressing the prevention of sewer spills. Table 1-4 provides a schedule for incorporation of these activities into the Districts’ SSMP program implementation.

Table 1-4: Planned SSMP Implementation Milestones Addressing Prevention of Sewer Spills
Element Milestone Milestone Due
Date
Relevance to Spill Prevention
4 – Operations and
Maintenance
Program
Implementation of
Cityworks asset
management system
June 20261Improve tracking of system issues
and planning and scheduling of
maintenance activities
4 – Operations and
Maintenance
Program
Implementation of
GraniteNet cloudbased CCTV software2
November 2027 Improve sharing of condition
assessment data for streamline
decision-making and communication
Specification 5.7 –
Allocation of
Resources
Approval of sewer fee
increase
July 2025 Collect revenue needed to sustain
operations and maintenance service
delivery
8 – System
Evaluation
Initiate Condition
Assessment Program
for remaining pump
stations3
November 2027 Collect information to identify system
condition deficiencies
8 – System
Evaluation
Initiate next cycle of
Condition Assessment
Program for sewer
pipelines
July 20254 Collect information to identify system
condition deficiencies
1Currently anticipated, subject to change
2Software development began in May 2025 for the implementation of the GraniteNet Cloud-based CCTV Software 3Began with the Condition Assessment for pump stations for the City of Diamond Bar. Report was completed in June 2019
4New CCTV contract to begin in July 2025 and continue the 2nd phase of the Condition Assessment project

1.4 Sewer System Asset Overview
The City’s Public Works Department (“City PW”) manages the sanitary sewer collection system, which serves a population of approximately 263 residents and consists of 49.86 miles of sewer lines. The City's local sewers discharge into the Sanitation Districts of Los Angeles County facilities for conveyance, treatment, and disposal.

The City is responsible for the budgeted management positions directly involved in sewer system responsibilities. The field operation and maintenance services are fulfilled by utilizing the services provided by LACPW.

These personnel, in collaboration with LACPW personnel, administer the City's sewer collection system operation, provide engineering evaluation of proposed and existing sewer facilities, administer preventive maintenance and sewer construction programs, and oversee the maintenance of sewer collection system facilities and related records and plans. Appendix A3 provides a summary of assets for all collection systems.

Other relevant information regarding the City’s collection systems and management program includes:

Page 110 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 5
• Location: Collection systems are located in Los Angeles County. • Service Area Boundary:
•
•
•
• a and 1-1b shows the geographic service area boundary in the City and Districts. • Community Served: The City covers 9.16 square miles including commercial, industrial, agricultural, recreational, institutional, and miscellaneous properties. • Data Management Systems: Districts use the following data management systems.
o Maximo: LACPW legacy Maintenance Management System (MMS) used for managing maintenance activities. Field crew activities are recorded in various forms such as service requests, cleaning reports, sewer maintenance daily reports, manhole adjustments, overflow report forms, etc., and are stored in the MMS. The LACPW is in the process of

Page 111 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 6
implementing Cityworks Maintenance Management System to schedule and track maintenance activities.
o Cityworks: LACPW is implementing Cityworks Maintenance Management System to schedule and track maintenance activities. The condition assessment schedule and eventually CCTV is planned to be added to Cityworks. Cityworks will be used to record what sections have been inspected, the schedule of activities, and whether work has been completed or not. It will also be used to schedule and track FOG source control inspections of industrial and commercial establishments. o HMS: LACPW utilizes the HMS database to maintain records of all sites and their locations under the FOG program. Inspectors document their findings and enter data into the HMS database, which automates the inspection process and is used to track and manage permit inspection and source control data.
o PowerBI: PowerBI is utilized to display spill trends and analysis, as well as City profiles, which include detailed information on manholes, pipes, pump stations, and properties. Additionally, Power BI is used to display productivity reports, detailing maintenance activities for each city. o CCTV Database: Wincan and GraniteNet are used to document inspection events, inspection observations and associated videos.

These systems serve as the repository for historical CCTV inspection data. LACPW is in the process of linking GraniteNet with Cityworks to maintain CCTV records.
o CADD: As-built plans of the Districts’ facilities are maintained by LACPW for unincorporated Los Angeles County areas and by each city within the CSMD for their own jurisdiction, with LACPW maintaining a copy for maintenance operations. Data gathered from the plans, such as system locations and alignment, pipe material, size, etc., are stored in the SMD’s Computer-Aided Design and Drafting (CADD) System and Geographical Information System (GIS).
o GIS: LACPW and the City utilize GIS to generate a mapping system that includes sewer features and map base layers such as aerial images, streets, parcels, and storm drain systems also available from other Divisions within LACPW, County Departments and other governmental agencies. The City utilizes GIS for the system boundary, the locations of domestic waste clearance permits with grease control devices, and other related items.
o SCADA: Supervisory Control and Data Acquisition system used to collect and store pump station alarm and instrumentation data. o Microsoft Office: Various collection system programs are managed using Microsoft Office applications as an electronic database. Currently, Office is used to store the schedule for FOG program activities, but this will eventually be performed using Cityworks.

Page 112 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 7
• Lateral Ownership and Operational Responsibilities: LACPW and the City do not own any portion of the service lateral. Private service laterals are the responsibility of the property owner and must be maintained by the property owner.

Operation and maintenance of the local main sewer lines are the responsibility of LACPW. Regional trunk sewer lines are the responsibility of the publicly owned treatment works, such as the Los Angeles County Sanitation Districts (“LACSD”), for operation and maintenance.
• Breakdown of Service Connections: City of Industry breakdown of services connections is roughly 1 percent is residential, 17 percent is commercial, 70 percent is industrial, and 12 percent are a combination of agricultural, recreational, institutional, and miscellaneous properties.
• Unique Service Boundary Conditions and Challenges: The service area faces issues with conflicts involving local lines and jurisdictional determinations between agencies like the LACSD and the City of Los Angeles, impacting operations and maintenance.

Page 113 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 8
Figure 1-1a: City of Industry Service Area Map

Page 114 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 9
Figure 1-2b: CSMD Service Area Map

Page 115 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 10

1.4.1 Access to Up-to-Date Mapping
LACPW provide public access to up-to-date sewer mapping through their website.

LA County Sanitary Sewer Network GIS Map:
• https://pw.lacounty.gov/smd/sewernetwork/
Operation Maps:
• https://dpw.lacounty.gov/sewer/Page_15

1.5 SSMP Overview
This SSMP complies with the General Order and meets the following General Order objectives:
a) Properly fund, manage, operate and maintain, with adequately trained staff and/or contractors possessing adequate knowledge, skills, and abilities as demonstrated through a validated certification program at all times, all parts of the collection system owned and/or operated by the discharger.
b) Provide adequate capacity to convey base flows and peak flows, including flows during wet weather events, to the minimum design criteria as defined in the discharger’s System Evaluation and Capacity Assurance Plan (a required component of the SSMP), for all parts of the collection system owned and/or operated by the discharger.
c) Take all feasible steps to stop and mitigate the impact of spills in the collection system owned and/or operated by the discharger.

The City together with LACPW achieves these objectives by implementing a comprehensive sewer infrastructure asset management program that is documented in the following 11 SSMP elements:

1. Goal and Introduction

2. Organization

3. Legal Authority

4. Operation and Maintenance Program

5. Design and Performance Provisions

6. Spill Emergency Response Plan

7. Sewer Pipe Blockage Control Program

8. System Evaluation, Capacity Assurance and Capital Improvements

9. Monitoring, Measurement, and Program Modifications

10. SSMP Program Audits

11. Communication Program
When appropriate, the SSMP references other program documentation for greater detail.

Page 116 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 11
2 Organization

2.1 Overview
LACPW are governed by the Board of Supervisors, who establish laws and approve all LACPWs contracts and agreements. LACPW is led by the Director, who sets policies and oversees their implementation. Supporting the Director are the Chief Deputy Director, Assistant Director, Deputy Director, and Assistant Deputy Director, who help manage daily operations and special projects.

The Sewer Maintenance Division has 213 budgeted positions. The distribution of the SMD personnel is depicted in the organizational chart presented in Section 2.3.2 of this chapter.

These personnel provide engineering evaluations of proposed and existing sewer facilities, administer LACPWs sewer service charge ordinance, carry out annexation proceedings for new territories, form and dissolve service zones, maintain facility record plans, and administer preventive maintenance and sewer construction programs.

Key roles include the Principal Engineer and the Senior Civil Engineers, who manage engineering and field staff. There is a Senior Civil Engineer designated for office engineering and budget, field operations team for pump stations, and field operations team for the gravity system. The gravity system unit includes the Regional Sewer Maintenance Superintendent and Sewer Maintenance Supervisor, who assists the Senior Civil Engineer and oversee sewer maintenance activities, with field crews performing the actual maintenance work. For the pump station unit, the Electro-Mechanic Supervisors and their teams handle pump station operations. Office Administrative and Clerical Assistants are part of all units and assist in the preparation of the SMD budget, Board letters, and other correspondence, and are responsible for the sewer service charge direct assessments.

Other divisions within the LACPW are currently and will continue to be responsible for carrying out some of the compliance actions called for by the WDRs for the LACPW. The key support divisions and their responsibilities are described below:
• Workforce Support Division: Responsible for procuring equipment, materials, and supplies needed for day-to-day operations and maintenance activities; printing and mailing public education outreach program materials. • Business Relations and Contracts Division: Responsible for procuring contract services for engineering, emergency sewer repair projects, and closed-circuit televising of sewer lines.
• Building and Safety Division (BSD): Responsible for issuing permits for sewer connections. May also enforce Plumbing Codes involving proper connections, maintenance of sewer house laterals, and preventing illegal discharges into public sewers upon city contract.

Page 117 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 12
• Sewer Maintenance Division (SMD): Responsible for administering the Districts including operation and maintenance of the sewer systems, repairs and rehabilitation, and providing regulatory compliance.
• Environmental Programs Division (EPD): Responsible for enforcing the Districts’ Fats, Oils, and Grease (FOG) program, including point source control, inspection of industrial waste and grease-generating facilities, investigation of illicit discharges of chemicals, debris, etc., into the public sewer, and conducting water quality monitoring for spills of 50,000 gallons or more to surface water. • Stormwater Maintenance Division: Assists the Districts’ crew in tracing, containing, and cleaning up spills that reach a storm drain system. • Emergency Management Group: Responsible for operating the Emergency Operation Center for the entire Department, including handling service calls, spills, and pump station malfunction calls for the Districts.
• Human Resources Division: Responsible for staffing the Districts and training personnel.
• Design Division: Responsible for developing design standards and criteria for capital improvements.
• Project Management Division III (PMD III): Responsible for providing project management services for the construction of capital improvements. • Land Development Division (LDD): Responsible for subdivision plan checks to ensure compliance with County standards for the construction of new sewer collection systems. Reviews sewer capacity studies for proposed lines and sets requirements to ensure adequate capacity in existing systems. • Survey/Mapping and Property Management Division: Responsible for processing access easement documents and procuring easements for public sewer facilities located on private properties. Also responsible for investigating spill-related claims and litigations against the SMD.

City of Industry is governed by the City Council, who establishes new and amending existing ordinances and policies governing the municipal operations and the operation of the City’s sanitary sewer system, including the approvals of all SO&M contracts and agreements, to protect the community’s interest. The City Manager for the City is responsible for the overall management and application of all legal and policy directives that relate to the City's activities, including the operation and maintenance of the City's sanitary sewer system. The Director of Public Works/City Engineer implements City policy within the scope of the City Council’s direction and legal requirements, directs policy execution, and evaluates work accomplished by the City, assists with the development and enactment of new ordinances, and directs the enforcement of Plumbing Codes involving illegal connections, upkeep of sewer laterals, and the design and construction of new and rehabilitation of existing sewer collection systems. As necessary, the Director of Public Works/City Engineer manages or performs the following duties:
• Directs emergency sewer repair activities, special studies, investigations, and reports concerning the City’s sewer infrastructure.

Page 118 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 13
• Directs studies, investigations, and the preparation of reports, budget, and contractual agreements with other organizations for the City’s sewer system. • Oversees office engineering, clerical, and field operation and maintenance staff.

The Director of Public Works/City Engineer will have authority to make future revisions to this SSMP as this plan is an evolving document subject to future field conditions. However, if the revisions to the SSMP are significant, the updated document will be brought to the City Council for approval.

Other Departments or Divisions within the City and specific contracted services, including L.A. County, are currently and will continue to be responsible for carrying out some of the compliance actions called for by the WDRs for the City. The key support units and their responsibilities are described below:
• Administrative Services Department (L.A. County) – Responsible for procuring equipment and as-needed contract services for emergency sewer repair projects; printing and mailing of public education outreach program materials; procuring materials and supplies needed for the dayto-day operation and maintenance activities; accounting services; and training of personnel. Also responsible for investigating SSO-related claims and litigations against the City.
• Building and Safety Division (L.A. County) – Responsible for reviewing various building permit applications, their relationship to public easements and facilities, and issuing permits for sewer connections. Also, the enforcement of Plumbing Codes involving proper connection and discharge into the public sewer system and the property owner's maintenance of their respective sewer laterals between the structure served and the public mainline sewer.
• Construction Division (L.A. County) – Responsible for administrating the City’s sewer rehabilitation and reconstruction contracts and emergency sewer repair projects when requested by the City.
• Sanitation Districts of Los Angeles County - Responsible for the City’s Industrial Waste Program and for enforcing the Fat, Oil, and Grease Program (FOG), including source control and grease-generating facilities.
• Stormwater Maintenance Division (L.A. County) – Assists the City in tracing, containing, and cleaning up SSOs that reach a storm drain system. • LACPW – LACPW provide critical services to the City to address the mandates of the WDRs. Sewer Maintenance Division is responsible for operational maintenance services of the City's sewer collection system, including cleaning, closed-circuit television (CCTV) inspection, manhole inspection, and repairs.
• County of Los Angeles Fire Department – Responsible for assisting with protecting the public in the event of an SSO that expands into high-use public travel ways and/or those that reach storm drains or water courses and spread the effect of public risk to health and safety impacts.
• County of Los Angeles Sheriff's Department – Responsible for operating the Emergency Operation Center for the entire City, including handling after-hour service calls reporting SSOs, pump station malfunction calls, and forwarding those reports to the LACPW.

Page 119 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 14
• CNC Engineering (City Consultant)
• Directly assists the City in preparing studies, investigations and reports, and review of budget and contractual agreements with other organizations. • Responsible for subdivision plan checks to ensure compliance with the Department’s standards for construction of new sewer collection systems. CNC checks sewer-capacity studies to size proposed SMDs lines and sets requirements to ensure adequate capacity in existing systems.
• Responsible for the processing of access easement documents and procuring easements for public sewer facilities located in private properties. Also assists in investigating SSO-related claims and litigations against the City. • Prepares or directs emergency repair activities, special studies, and investigations and reports concerning the City’s sewer infrastructure. • Oversees office engineering, clerical, field inspection, field operation, and maintenance staff on behalf of the City.

The distribution of the City’s personnel is depicted in the organizational chart presented in Section 2.3.2 of this chapter.

2.2 Authorized Representatives
The Director of Public Works/City Engineer for the City and the Assistant Deputy Director for SMD are responsible for the execution of the compliance actions required under the WDRs. This includes, but is not limited to, signing and certification of all reports and correspondence as required under this order. The Principal Engineer and Senior Civil Engineers in SMD may also perform these duties on behalf of the SMD’s Assistant Deputy Director or Director of Public Works for the City.

The Sewer Maintenance Districts has following staff authorized to serve as Onsite Managers for the collection systems managed by LACPW:
• Andrew Ngumba, Assistant Deputy Director (Primary LRO for LACPW) • Alex Villarama, Principal Civil Engineer (Secondary LRO for LACPW) • Jeffrey Bouse, Senior Civil Engineer
• Haris Harouny, Senior Civil Engineer
• May Hong, Civil Engineer
• Eric Liu, Civil Engineer
Each of these staff members are authorized to act on behalf of each of LACPWs collection system to serve as Legally Responsible Officials for each of the collection systems listed in Table 2-1. District LROs coordinate to ensure one of the designated LROs is available for required reporting certification in CIWQS. In addition, each collection system in the County owned by a city also has at least one Legally Responsible Official from that City’s staff.

Page 120 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 15
City of Industry Legally Responsible Official:

Joshua Nelson, City Manager (Primary LRO for City of Industry) Mathew Hudson, Director of Public Works (Secondary LRO for City of Industry) Table 2-1: Collection Systems Operated, Maintained and Managed by Los Angeles County Public Works
WDID Type2 CIWQS WDID CIWQS Collection System Name
CSMD – City 4SSO10394 City of Industry

2.3 Positions Responsible for Implementing Specific SSMP Elements

2.3.1 Positions Responsible
A list of positions responsible for implementing specific SSMP elements is provided in Table 2-2. Additionally, Appendix B1 contains a list of staff responsible for implementing specific SSMP elements, including position, telephone number and email address. 2 CSMD – Consolidated Sewer Maintenance District
MSMD – Marina Sewer Maintenance District
SMA – Sewer Maintenance Agreement
Table 2-2: Positions Responsible for SSMP
SSMP Element Responsible Org. Unit Responsible Position

1. Introduction and Goal Sewer Maintenance Division/
City of Industry: Public Works
Division Manager and City’s
Director of Public Works

2. Organization Sewer Maintenance Division/
City of Industry: Public Works
Division Manager and City’s
Director of Public Works

3. Legal Authorities Sewer Maintenance Division/
City of Industry: Public Works
Division Manager and City’s
Director of Public Works

4. Operation and Maintenance Program - Pipelines Sewer Maintenance Division Principal Civil Engineer, Pipelines

4. Operation and Maintenance Program – Pump
Stations
Sewer Maintenance Division Senior Civil Engineer, Treatment Plants and Pump Stations

5. Design and Performance Provisions - Design City of Industry: Public Works City’s Director of Public Works

5. Design and Performance Provisions – Design -
Construction
City of Industry: Public Works City’s Director of Public Works

6. Spill Emergency Response Plan Sewer Maintenance Division Principal Civil Engineer, Pipelines

7. Sewer Pipe Blockage Control Program City of Industry: Public Works City’s Director of Public Works and Operations Manager/CNC
Engineering

8. System Evaluation, Capacity Assurance and
Capital Improvements – Condition Assessment and
Prioritization of Corrective Actions
Sewer Maintenance Division Senior Civil Engineer, Technical Services

8. System Evaluation, Capacity Assurance and
Capital Improvements – Capacity Assurance
City of Industry: Public Works City’s Director of Public Works

8. System Evaluation, Capacity Assurance and
Capital Improvements – Capital Improvement Plan
City of Industry: Public Works City’s Director of Public Works

Page 121 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 16

2.3.2 Lines of Authority
Figure 2-1, Figure 2-2a, and Figure 2-2b includes an SSMP Program Implementation organization chart showing the lines of authority for the positions responsible for the management of the collection system and implementation of the SSMP. The contact information for the Sewer Maintenance Division staff and City’s staff listed in Figure 2-2 can be found in Appendix B2.

Table 2-2: Positions Responsible for SSMP
SSMP Element Responsible Org. Unit Responsible Position

9. Monitoring, Measurement and Program
Modifications
Sewer Maintenance Division/
City of Industry: Public Works
Division Manager and City’s
Director of Public Works

10. Internal Audit Sewer Maintenance Division/
City of Industry: Public Works
Division Manager and City’s
Director of Public Works

11. Communication Program Sewer Maintenance Division/
City of Industry: Public Works
Division Manager and City’s
Director of Public Works

Page 122 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 17
Figure 2-1: LACPW Organizational Chart

Page 123 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 18
Figure 2-2a: SMD Organizational Chart
Figure 2-2b: City Organizational Chart

Page 124 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 19

2.4 Spill Reporting Chain of Communication
LACPWs Spill Emergency Response Plan, described in Element 6 and included in Appendix F1, includes procedures for effective communication and reporting of spills from receipt of complaint, including the person responsible for reporting spills into the State Water Board’s CIWQS database. The Spill Emergency Response Plan includes a flowchart and notification table providing clear step-by-step procedures for communication and reporting. Figure 2-3 summarizes the spill reporting chain of communication during normal business hours. Normal Business hours are Monday through Friday from 6:30 a.m. to 5:00 p.m. Figure 2-4 summarizes the spill reporting chain of communication during afterhours.

Figure 2-3: Spill Reporting Chain of Communication – Normal Business Hours *Normal Business hours are Monday through Friday from 6:30 a.m. to 5:00 p.m.

County
Dispatch
• Receives Call
• Dispatches Field Crew
SMD Field
Crew
• Responds to Spill
• Documents Field Spill Report
SMD
Supervisor
or Supt
• Reviews Field Spill Report
CIWQS
Data
Submitter
• Request Additional Information from Field Staff, if needed • Enters Draft CIWQS Spill Report
CIWQS
LRO
• Review Draft CIWQS Spill Report
• Certifies Report

Page 125 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 20
Figure 2-4: Spill Reporting Chain of Communication – After Hours *After Hours are any hours that are not Normal Business Hours.

County
Dispatch
• Receives Call
• Dispatches Field Crew
On-Call
Supervisor
or Supt
• Investigates Spill
Standby
SMD Field
Crew
• Responds to Spill
• Documents Field Spill Report
SMD
Supervisor
or Supt
• Reviews Field Spill Report
CIWQS
Data
Submitter
• Request Additional Information from Field Staff, if needed • Enters Draft CIWQS Spill Report
CIWQS
LRO
• Review Draft CIWQS Spill Report
• Certifies Report

Page 126 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 21
3 Legal Authority

3.1 Overview
The City's legal authority to own and operate a sanitary sewer system is derived from its incorporation as a city. The City on June 26, 1986, by Resolution No. 1338, granted the LACPW the consent and jurisdiction to annex portions of the City’s sewer system into the CSMD. By that action, the City has entrusted the management, operation, and maintenance of its local sanitary sewer system to the CSMD. The City, however, still maintains ownership of the sewer system.

The legal authorities for the specific areas stipulated in the General Order are covered in various sections of the City Municipal Codes (“CMC”s). The City has adopted by reference the 2022 Edition of the California Plumbing Code together with the Los Angeles County Title 28 – Plumbing Code and the Los Angeles County Title 20 – Utilities, which regulates sanitary sewers and industrial waste in in the County as its Sanitary Sewer and Industrial Waste Ordinance.
• City of Industry Municipal Code - https://ecode360.com/IN4941 • Plumbing Code Chapter 15.24 - https://ecode360.com/44192105#44192105 • Sanitary Sewers and Industrial Waste – Ordinance No. 751-U “Urgency ordinance adopting the Los Angeles County Code Chs. 20.20, 20.24, 20.28 and

20.32 by reference” the City has also adopted all portions of Division 2 of LACO TITLE 20, which regulates sanitary sewers.

The Districts were formed pursuant to Chapter 4 of the State of California Health and Safety Code (Section H4870 – 8), with the County of Los Angeles Board of Supervisors acting as their governing body. By law, the Board of Supervisors may make and enforce all rules and regulations necessary for the administration of the Districts and for the cleaning, repair, construction, rehabilitation, renewal, replacement, operation, and maintenance of collection sewers within the Districts. Consistent with the law, several ordinances have been established by the Board of Supervisors to govern all aspects of the Districts' operations. The legal authorities for the specific areas stipulated in the WDRs are covered in various sections of the Los Angeles County Plumbing Code (LACO Plumbing Code) and Chapters 20.20, 20.24, 20.26, 20.32, 20.34, 20.36, and 20.40 of the Los Angeles County Code (LACO Code) Title 20 – Utilities, some of which are discussed below. Table 3-1 and Table 3-2 summarizes these authorities and relates them to elements of the SSMP that are impacted or utilize these authorities. Specific legal authorities are described in more detail in the elements that follow.

For the contracted cities that have service agreements with the Districts, the provision of services is dependent on the specific terms of the agreement. It is assumed that the legal authorities are extended to the Districts to provide services to these Cities.

The LACO Code, LACO Plumbing Codes, standard plans, specifications, and other materials cited in this Section are filed at the office of the Director of Public Works and can be found online in the links below:
• Los Angeles County Code

Page 127 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 22
(https://library.municode.com/ca/los_angeles_county/codes/code_of_ordinances) • Los Angeles County Plumbing Code
(https://library.municode.com/ca/los_angeles_county/codes/code_of_ordinances ?nodeId=TIT28PLCO)
Table 3-1: Summary of Legal Authorities Relating Legal Authority Element of General Order
Requirement Reference
Prevent illicit discharges into the wastewater
collection system
LACO 20.24.020 – Applicability of Division 2 provisions LACO 20.24.200 – Notification of uncontrolled discharges required LACO 20.32.080 – Excessive discharge of sewage – Conditional permit requirements
LACO 20.32.650 – Dumping of effluent - Conditions
LACO 20.36.010 – Discharge of offensive or damaging substances prohibited
LACO 20.36.400 – Deposit of certain substances prohibited CPC 714.1 – Unlawful Practices
CPC 714.2 – Prohibited Water Discharge
Collaborate with storm sewer agencies to
coordinate emergency spill responses, ensure
access to storm sewer systems during spill
events, and prevent unintentional cross
connections of sanitary sewer infrastructure to
storm sewer infrastructure
The City is part of Consolidated Sewer Maintenance District, which is managed by LACPW. All city spills will flow to city storm drainage system and then to the County flood control system. CSMD and the Flood Control District are both part of Los Angeles County Public Works and staff have direct contact with one another to coordinate and access additional resources and support, if needed
Require that sewers and connection be
properly designed and constructed
LACO 20.32.010 – Sewer construction permit required when – Period of validity
LACO 20.32.330 – New main sewer lines
LACO 20.32.340 – Water pollution control and sewage pumping plants
LACO 20.32.350 – New house laterals
LACO 20.32.390 – Dedication of sewers
LACO 20.32.580 – Materials and construction – Conformity with standard specifications
LACO 20.30.590 – Inspection by county engineer
Ensure access for maintenance, inspection,
and/or repairs for portions of the service
lateral owned or maintained by the Agency
LACO 20.20.130 – House lateral
LACO 20.24.080 – Maintenance of sewer and laterals
The City does not own or maintain any portion of the house lateral.

The house lateral is the part of the sewer piping within the street or right-of-way extending from the property or sewer right-of-way line to point of connection with the main-line sewer
Enforce any violations of its sewer ordinances,
service agreements, and/or other legally
binding procedures
LACO 20.24.100 – Enforcement—County engineer powers
LACO 20.24.110 – Delegation of powers
LACO 20.24.160 – Violation – Penalty
LACO 20.24.170 – Continued violations
Obtain easement accessibility agreements for
locations requiring sewer system operations
and maintenance, as applicable
LACO 20.32.240 – Sewer easement processing fees
LACO 20.32.430 – Sewer easement requirements
Table 3-2: Summary of Legal Authorities Relating Sewer Pipe Blockage Control Program Element of General Order
Requirement Reference
Requirements to install grease removal
devices (such as traps or interceptors)
LACO 20.36.560 – Installation – Required when
Design standards for the grease removal
devices
LACO 20.36.570 – Pretreatment – Standards and criteria

Page 128 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 23
Maintenance requirements, BMP
requirements, record keeping and reporting
requirements for grease removal devices
LACO 20.36.610 – Operation and maintenance
Industrial Waste Permits – Authorities enable the inclusion of additional specific maintenance requirements on Industrial Waste Permits provided to food service establishments.

Authority to inspect grease producing facilities LACO 20.24.090 – Inspection to ascertain compliance—Access required—Acceptance of permit conditions
LACO 20.24.150 – Interference with inspectors prohibited when LACO 20.36.620 – Inspection and testing
LACO 20.36.630 – Right of entry for inspection authorized when

3.2 Authority to Prevent Illicit Industrial Waste Discharges into the Collection System
The LACO Plumbing Code Title 28 (Sections 306.2, 714.2, and 1101.2) prohibits the unauthorized discharge of rain, surface, or subsurface water into the collection system.

The illegal dumping of offensive or damaging substances such as chemicals and debris, which are considered inflows, is prohibited by LACO Code, Section 20.36.010.

3.2.1 Prevention of Illicit Discharge of FOG
Section 20.36.400 of the LACO Code prohibits the discharge of Fats, Oils, and Grease and other substances that may, among other things, clog, obstruct, fill, or necessitate frequent repairs, cleaning out, or flushing of sewer facilities in the sewer system.

3.2.2 Prevention of Illicit Discharge of Infiltration/Inflow LACPW have an Inflow/Infiltration (I/I) control program as part of their ongoing sewer line cleaning and maintenance program, which includes closed-circuit television and other mechanisms to detect I/I. By ordinance, the Board of Supervisors has established a financial plan to ensure capital replacement or rehabilitation of sewer lines prone to I/I within the Consolidated Sewer Maintenance District (LACO Code, Section 20.40.045).

The Marina Sewer Maintenance District provides adequate funding to eliminate I/I sources in the mainline sewers and manholes.

The LACO Code, Section 20.24.080, requires property owners to maintain their house laterals, including the elimination of cracks, tree roots, and other debris. A similar requirement is found in Section 101.3.2 of the LACO Plumbing Code Title 28.

3.3 Authority to Collaborate with Storm Sewer Agencies
Spills from the City’s collection systems flow into the City’s storm drainage systems and Los Angeles County Flood Control drainage systems. Los Angeles County Public Health requires all cities in the Districts to report sewer spills that reach a drainage system within 15 minutes of knowledge of the event. As a result, Los Angeles County Flood Control is notified and can provide support to provide information and access to County drainage system facilities, if needed. The Sewer Maintenance Division, being a sister division to Stormwater Maintenance Divisions that manages the Flood Control System, allows for direct collaboration, allowing for efficient management and resolution of spills and drainage issues.

Page 129 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 24
With regards to preventing cross connections of sanitary sewer infrastructure to storm sewer infrastructure, the City works under the services of the LACPWs Building and Safety Division (“BSD”).

3.4 Authority to Require Proper Design and Construction of Sewers
The LACO Code Sections 20.32.330 and 20.32.340, as adopted by the City under Ordinance 751-U, require that the design of new mainline sewers and pumping plants, respectively, be in conformity with requirements of Part 3 of Chapter 20.32 of the LACO Code. Similarly, Section 20.32.350 of the LACO Code requires that the design of new house laterals conform to the requirements of Part 3, Chapter 20.32 of the LACO Code unless otherwise covered by the LACO Plumbing Code, Title 28. The construction of a collection sewer system, by law (LACO Code 20.32.580), is required to conform to all the requirements prescribed by Division 2 of the LACO Code, by the Standard Specifications for Public Works Construction (“Green Book”) and by the Special Provisions and Standard Plans, all on file in the office of the Director of Public Works (“County Engineer”). The inspection and construction of mainline sewers and pumping plants to ensure proper construction is covered under Section 20.32.590 of the LACO Code, and regulated under the City’s CMCs. The construction of house laterals is covered under the LACO Plumbing Code.

3.5 Authority to Ensure Access to Publicly Owned Portion of Lateral
The City and County do not own or maintain private lateral sewer lines. Property owners are responsible for proper installation, operation, and maintenance laterals (the pipe that connects from the building to the main) and clean-outs (which provide access to clean and repair the pipe from the building to the main). This includes laterals on the County-owned easement.

3.6 Limit the Authority to Discharge of FOG and other
Debris
The Director of Public Works under the LACO Plumbing Code, Title 28, as adopted under Ordinance No. 751-U, has the legal authority to require the installation of grease interceptors at restaurants and other food establishments that generate grease. Section

20.36.560 of LACO Code also gives the Director of Public Works the authority to require the installation of treatment facilities, including grease interceptors, at any facility that generates FOG in the amount that will damage or increase the maintenance costs of the sewer collection system.

The City’s adoption of LACO Code Section 20.24.090 gives the Director of Public Works the legal authority to inspect mainline sewers, sewage pumping plants, interceptors, etc., as often as he deems necessary, to ascertain whether such facilities are maintained and operated in accordance with the provisions of Division 2 of the LACO Code.

Page 130 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 25
Authority to Enforce Violations of Sewer Ordinances.

Under Section 20.24.100 of the LACO Code, as adopted by the City under Ordnance No. 751-U, the Director of Public Works is empowered to enforce all of the requirements prescribed in Division 2 – Sanitary Sewers and Industrial Waste of the Code and in accordance with Section 20.24.110 may delegate this authority. LACO Code Section

20.24.160 allows criminal penalties for any violations of the Sewer and Industrial Waste Ordinances.

3.7 Authority to Obtain Easement Accessibility Agreements When Applicable
Title 20, Division 2 of the LACO Code, as adopted by the City under Ordinance 751-U, gives the LACPW the legal right to set requirements that allow unrestricted maintenance access to the public sewer infrastructure. This access is secured through the LACPW unwavering enforcement of the requirement for sewer easements around all public sewer appurtenances located in private properties. These easements are detailed by the designer on the sewer construction plans and are reviewed through the iterative plan check process. Plan checkers take special care to ensure that maintenance crews will have room for access and equipment usage for both routine maintenance and replacement or repair construction as necessary. Title 20 requires easements to be free of obstruction, and this is reiterated on all sewer plans that contain easements. The potential for conflict or restriction of access is reviewed exhaustively during plan check.

Page 131 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 26
4 Operation and Maintenance Program

4.1 Up-to-Date Map of the Collection System
LACPW gathers as-built plans and compiles into a central Document Management System, CADD System, and GIS system maintained by the Districts. The City utilizes GIS and paper copy maps for maintaining as-built maps and the LACPW collects a copy for maintenance operations. Data gathered from the plans, such as system locations and alignment, pipe material, size, etc., are stored in LACPWs Computer-Aided Design and Drafting System and GIS.

4.1.1 Procedures for Maintaining and Providing Access to Water Boards Staff
LACPW provides access to up-to-date maps of the sewer system via:
• Interactive GIS-maps
• Electronically available as-builts
• Printed and electronically available Map Books
GIS Maps
The interactive GIS-based map of the sewer system is available online on the LACPWs and City’s websites:
• https://dpw.lacounty.gov/smd/sewernetwork/
• https://gisindustry.hub.arcgis.com/datasets/e39d8da8a7534288a3a83a3fb83ffdd6_64/expl ore?location=34.018000%2C-117.935100%2C12
Within GIS, the Districts maintains a mapping system as seen in Figure 4-1 that includes sewer features such as pipe or manhole location, diameter, material, flow direction, etc.

The system includes map base layers such as aerial images, streets, parcels, and storm drain systems also available from other Divisions within LACPW and other governmental agencies. The maps are regularly updated to reflect any changes in the system. Once Cityworks is implemented, valves will be included into the system map.

Page 132 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 27
Figure 4-1: CSMD Sewer Network Map
Sewer As-Builts
Sewer as-builts can be obtained from the City and/or LACPW. To retrieve the as-builts, LACPW has provided detailed instructions on how to locate the as-builts for a desired sewer line on the SMD webpage. Using the sewer network map to obtain the overlay operation map book, the map book lists the as-built sewer plan number that can be searched on LACPWs Land Record Site, see Figure 4-2. The City maintains original asbuilts of sewers at City Hall.

The sewer as-builts are located on LACPWs Land Record site:
• https://pw.lacounty.gov/smpm/landrecords/SewerPlans.aspx

Page 133 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 28
Figure 4-2: Sewer Plans Webpage
Map Books
Printed system maps are stored in the Mapping and Annexation Unit of the SMD located at 1000 South Fremont Avenue, Alhambra, California. These maps are also distributed to the SMD’s field crew, for work scheduling and responding to emergencies, and to the City.

Individual map books can be found using the operation maps overview map as seen in Figure 4-3.

These map book pages are electronically available on the LACPWs website:
• https://dpw.lacounty.gov/sewer/Page_15

Page 134 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 29
Figure 4-3: Operations Map Overview Map

4.1.2 Availability of Up-to-Date Mapping to Support Collection System Management
LACPWs print map books for sewer maintenance crews to use in the field for locating sewer infrastructure. When discrepancies are identified in sewer mapping, crews note them on printed map pages or through GIS on a phone and forward them to SMD GIS resources for updates. Field crews have access to both paper maps and the GIS phone application, depending on their preference.

Cityworks will eventually be downloaded onto cell phones and new LACPWs tablets, allowing crews to access facility information in real-time and log operation and maintenance activities directly into the system. The City’s GIS is continually being updated to include up to date sewer infrastructure maps of the system.

Page 135 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 30

4.2 Preventive Maintenance Program
LACPWs maintenance services are provided from six maintenance yards strategically located within the County of Los Angeles for efficient management of maintenance activities including Spills and other emergencies. A map showing locations of the field maintenance yards and pump stations in Appendix D.

The cornerstone of LACPWs maintenance operation is the preventive maintenance program as described in LACPWs training guide maintained in each of the field maintenance yards. This program consists of regular inspection of the sewer system including manholes, pipes, siphons, pump stations (although no pump stations in the City), treatment plants, regular cleaning, repair, and related activities. This program is designed and carried out to detect and correct potential problems before they develop into major problems. The preventative maintenance program is implemented through the following key activities:
• CCTV Inspection
• Sewer Line and Manhole Visual Inspection
• Gas Trap Manholes and Siphons
• Drop Manholes
• Sewer Line Cleaning
• Root Foaming
• Periodic Maintenance
• Vermin and Odor Control
The Preventive Maintenance program utilizes LACPWs Sewer Maintenance Division Maintenance and Operations Manual, which describes these activities in detail. This manual is available on the SMD’s webpage:
• https://dpw.lacounty.gov/sewer/maintenanceandoperationmanual.pdf For each activity, the tasks and their frequency are determined either periodically, while others are determined based on inspection findings and yard determinations. The descriptions of inspection and maintenance activities and the frequencies for each activity are detailed below.

4.2.1 CCTV Inspection
Closed-circuit television (“CCTV”) inspections of sewer pipes are conducted to investigate and diagnose issues. Factors such as maintenance history, past overflow records, sewer line locations, and age are used to determine which pipes will be televised.

Additionally, LACPW implements CCTV inspections at a programmatic level through the Condition Assessment Program. This program aims to perform CCTV inspections and structurally rate approximately 500 miles of sewer infrastructure each year. Inspections are prioritized based on the number of spills per 100 miles for each jurisdiction.

Page 136 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 31

4.2.2 Sewer Line and Manhole Visual Inspection
The interior and exterior of manholes are inspected twice a year for any structural defects, sewage flow condition, presence of vermin or rodents, deleterious industrial waste, odors, and any signs of unusual settlement around or evidence of debris within the manholes and along sewer alignments.

4.2.3 Gas Trap Manholes and Siphons
In the south area, gas traps are inspected and cleared of any stoppages or flow restrictions every 6 months. In other parts of the County, they are inspected and cleared of any blockages on a monthly basis. Siphons may differ in timeframe depending on the type of lines but are generally performed monthly.

4.2.4 Drop Manholes
These facilities are inspected and cleared of stoppages and flow restrictions on a variable frequency and is dependent on prior inspection. The inspection cycle of the drop manholes aligns with the manhole inspection cycle in Section 4.2.2.

4.2.5 Sewer Line Cleaning
Sewer lines are cleaned by hydro jet or rodding. Frequency of cleaning is based on inspection records. Sewer lines known to accumulate grease, garbage grinds, or sand are put on monthly, quarterly, or semi-annual cleaning schedule and those prone to root growth are periodically rodded or chemically treated.

4.2.6 Root Foaming
Root foaming is performed on main sewer lines based on root intrusion and need, usually associated with overflowing. The frequency of root foaming is initially 1 year, then increases to an 18-to-24-month frequency.

4.2.7 Periodic Maintenance
Periodic Maintenance (“PM”s) are sites that require higher-frequency cleanings due to maintenance issues. These "hot spots" are identified in the field during maintenance and inspections of sewer facilities and are often caused by debris, root intrusion, or other factors. Segments that experience spills are also added under periodic maintenance.

4.2.8 Vermin and Odor Control
When evidence of infestations is observed during an inspection or a service request or complaint is received, sewers and structures are dusted or baited. Sewers infested by insects are chemically treated.

Page 137 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 32

4.2.9 Treatment Plants and Pumping Stations
The majority of the LACPWs pump stations are equipped with SCADA/alarm systems and are inspected at least once a week. Pumps and motors are lubricated, control mechanisms and valves are checked and adjusted as necessary, and equipment is repaired or modified as required.

Treatment Plants are inspected daily to comply with permit-required sampling and testing and perform routine maintenance. The equipment is cleaned and calibrated, and mechanical components and process units are checked. This is included for reference, as no pump station or treatment plant are located in the City.

4.3 Scheduling and Data Collection
Historically, LACPW generated and tracked work orders using the Maximo maintenance management system. The LACPW is in the process of implementing Cityworks maintenance management system to schedule and track maintenance activities. The activities the field crew performs are recorded in various forms such as service requests, cleaning reports, sewer maintenance daily reports, manhole adjustments, overflow report forms, etc., and are stored in the maintenance management system. All the asset inventory documenting maintenance activities and data collected are transferred over to the Cityworks maintenance management system to aid in the electronic filing and tracking.

4.4 Training
LACPWs staff responsible for the operation and maintenance of the sewer collection system attend formalized training classes or seminars provided by agencies such as California Occupational Safety and Health Administration (“CALOSHA”), California Water Environment Association (“CWEA”), and International Brotherhood of Electrical Workers (“IBEW”). Through this training, staff are well-versed in the latest industry, the best practices for safely and efficiently performing their tasks. Training is required for new staff and when new procedures are introduced.

LACPW also utilizes informal training approaches, including tailgate meetings, monthly safety meetings, and apprenticeship training programs led by higher-level staff. New Legally Responsible Officials and staff responsible for submitting data are informally instructed by an internal reporting expert. Additionally, only companies with well-trained and experienced staff are considered for either emergency spill mitigation or sewer construction and rehabilitation work.

The Sewer Operations Superintendents manage field operations and maintenance activities and are responsible for making sure all collection system field employees receive training in emergency response, spill investigation, and spill reporting duties. LACPW maintains records for all Spill Emergency Response Plan (“SERP”)-related training. The date, content, trainers, and attendees are recorded for all scheduled training courses.

Page 138 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 33
With regards to spill response training and spill volume estimation training, the field crews operate a large system with enough spill events to provide opportunities for senior crew members to provide live-drill training for new and less experienced staff. When these events occur, new crew members are invited to observe until they can perform activities on their own. This on-the-job training involves shadowing experienced crew members and learning directly on site, rather than through drills.

To estimate spill volume, the LACPW uses three methods most regularly: eyeball, measure volume, duration and flowrate. The District Staff preparing the estimate employ the method most appropriate to the sewer spill in question and use the best information available.

Table 4-1: Summary of Training Program
Training Type Description Recurrence
General Order
Requirements
Review of General Order Requirements performed
throughout the year in morning briefings at each yard.

Monthly – One element discussed
each month.

Spill Emergency
Response and Drills and
Spill Volume Estimation
Staff are trained in the field during live spill events.

Staff being trained observe trained crew members
perform activities to learn and then perform the
activities under supervision to check the training was
received.

Performed as-needed or at least
once annually.

CIWQS Reporting New Data Submitters are trained by experienced inhouse Data Submitters. Staff also attend industry provided training by CWEA and CASA and utilize
training videos from the State Water Board website.

Performed as-needed or at least
once annually.

4.5 Equipment Inventory
The maintenance crews are equipped with standard industry technologies including radio equipped trucks for easy communication, cellular phones, heavy and light construction equipment, vacuum trucks, pumps, generators, trucks equipped with closed-circuit television units for interior inspection of sewer lines, and various types of safety equipment.

Equipment is regularly checked, adjusted, repaired, or replaced as necessary. However, major fixed assets are replaced when they meet or exceed LACPW established fixed assets replacement criteria based on the age of the equipment, mileage, hours of use, repair history, etc.

Equipment categorized as Class 9 (less than ¼ ton) or lower is automatically replaced by the Fleet Management Group when it meets the replacement criteria. The request to replace equipment higher than Class 9 is made as part of LACPW annual budget. In addition to the above replacement criteria, an analysis and recommendation by trained staff of LACPW and approval by LACPWs administration is required to replace equipment higher than Class 9.

The City has acquired basic first responder equipment. The City’s field operations team coordinates with the crews of LA County in responses, however, the City field operations team maintains absorbent socks to contain spills in the event of arriving to a sewer system overflow first.

Page 139 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 34
Table 4-2: List of Major Equipment
Equipment Type Count
Inspection 22
Rodder 12
Vacuum 7
Compressor 2
Jetter 10
Pickup 25
Utility 4
Pump 6
Masonry 4
Dump 4
Construction 2
Sedan 1
Van/Passenger 2
Crane 2
2Axle 3
Stake 5
Tractor 2
TOTAL 113
These criteria, notwithstanding, a piece of equipment can also be replaced if its reliability or safety of operation becomes questionable. New and additional equipment are also acquired when fully justified based on increased workload, new activity, additional personnel, technological improvements, time and cost savings, employee or public safety requirements, etc. Each Collection System Yard maintains the spare equipment and parts needed by that yard to maintain the sewer pipelines and pump stations within the yard’s service area and each is responsible for ordering replacements.

Page 140 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 35
5 Design and Performance Provisions

5.1 Design and Construction Standards and Specifications The City requires that all sewers be designed in accordance with LACPWs standards. The LACPW has standard plans and specifications for the construction of sanitary sewers and appurtenances to ensure that sewer lines and connections are properly designed and constructed. The LACPW specifications by reference incorporate the:
• Standard Plans for Public Works Construction;
• Standard Specifications for Public Works Construction (“Green Book”); • Standard Plans Public Works 2000 Edition;
• Special Provisions; and
• Standard Drawings.

In addition, LACPW has other publications such as the Private Contract Sanitary Sewer Procedural Manual, Guidelines for the Design of Pump Stations, etc., to maintain consistency in the design of collection systems within the City/CSMD.

The City requires that these publications also be followed in the design of sewer systems within the City. To further ensure that sewer facilities are properly designed, the City requires construction drawings to be prepared by licensed engineers. The construction drawings are thoroughly reviewed by the City and SMDs engineers prior to approval for construction and inspection of the actual construction work. SMD review plans to ensure that appropriate maintenance standards are integrated into the design from a maintenance standpoint only.

5.2 Procedures and Standards for Inspecting and Testing System Improvements
To further assure that sewer facilities are properly designed and constructed, the LACPW requires that sanitary sewer plans are designed by licensed engineers and provides thorough review of plans prior to approval for and conducting inspection of construction work. Each city within CSMD has its own design and construction standards and requirements. Prior to accepting a newly completed sewer system for maintenance, each city is responsible for assuring sewers are designed and constructed to standard. The following procedures are used to ensure compliance with LACPW standards for portions of the system designed and constructed in unincorporated areas:

The following procedures are used to ensure compliance with LACPW standards for portions of the system designed and constructed within the City:
• The City provides inspection by outsourcing to qualified consultants for the inspection of new sewer construction projects. The City requires that as-built plans of the completed projects be submitted prior to final approval for acceptance of sewer facilities for public use.

Page 141 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 36
• Within the City new sewers, as well as sewer lines rehabilitated by lining, be televised and the video reviewed by SMD’s personnel prior to the acceptance of the completed project.
• In compliance with LACPWs policy, the City requires that all new or rehabilitated pumping stations be inspected by experienced SMD Electro-Mechanics prior to acceptance for maintenance by the SMD.
• LACPWs inspectors are well trained in pipeline and pump station construction.

They attend training classes and educational seminars to stay familiar with advancements in the industry. The inspectors are also provided with adequate materials to perform their jobs, including the Standard Specification for Public Works Construction Inspection Manual, the Green Book, etc.

Page 142 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 37
6 Spill Emergency Response Plan
The LACPWs Spill Emergency Response Plan (“SERP”), included in Appendix F provides guidelines for LACPWs maintenance crew to follow in responding to, cleaning up, and reporting sewer spills that may occur within the Districts’ service area, which includes the City. The purpose of the SERP is to support an orderly and effective response to sewer spills that ensure all regulatory requirements are met. The LACPWs SERP comprehensively addresses notification, response, assessment, and recordkeeping requirements of the SWCRB General Order as summarized in Table 6-1.

Table 6-1: Spill Emergency Response Plan General Order Compliance Order Requirement SERP
Section
Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
2, 3.4
Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; 2, 3.4, 3.7
Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; 4 Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
6 Address emergency system operations, traffic control and other necessary response activities; 3 Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;

3.4 Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;

3.4, 3.6
Remove sewage from the drainage conveyance system; 3.6
Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters;

3.6 Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;

3.6 Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; -
Conduct post-spill assessments of spill response activities; 3.8, 4.5 Document and report spill events as required in this General Order; and 4 Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.

6.1 6.1.1 Pre-Planned Coordination with Other Agencies or Departments The City’s field operations team supports securing the site and initial containment upon arriving first, before SMD field crews arrive. When appropriate, LACPW invites LACSD staff to discuss any jurisdictional inquiries or investigations of spills.

Page 143 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 38
7 Sewer Pipe Blockage Control Program

7.1 Program Overview
Analysis of sewer overflows over the last 3 years indicates an average of 83 percent of spills within the City collection system are linked to roots, vandalism, and others either as a primary or secondary cause factor. Between 2022 and 2025, an average of 9 percent of spills were linked to grease accumulation and 9 percent linked to debris accumulation. To prevent the build-up of fats, oils and grease (“FOG”) that can cause blockages and restrictions in flow, the City has implemented a FOG program to prevent sewage overflows into the environment, as well as to reduce the discharge of FOG to the sewer system.

The City’s Public Works (“PW”) department is responsible for performing fats, oils, and grease source control inspections of food service establishments (“FSE”s). Furthermore, as to the industrial wastewater discharge into the sewer system from non-FSA facilities, the Los Angeles County Sanitation District regulates industrial waste disposal on behalf of the City.

The City’s PW department issues a Domestic Wastewater Clearance permit (“DWWC”) found on the City website, where a pretreatment device may be required:
• https://industryca.portal.opengov.com/categories/1072/record-types/6471 The website provides FOG guidelines, standard drawings for grease pretreatment devices, permit forms, and details on EPD’s FOG program.

7.2 Implementation Plan and Schedule for Public Outreach

7.2.1 Summary of Outreach Activities
The LACPW conducts public outreach through various channels to educate the community about Fats, Oils, and Grease management:
• Community Events: LACPW participates in resource fairs, park events, and Earth Day- themed events, where staff distribute FOG brochures and answer questions from the community.
• Website Resources: The FOG page on LACPWs website provides a comprehensive list of FOG do’s and don’ts:
https://pw.lacounty.gov/SMD/grease/Index.cfm and
https://www.cityofindustry.org/179/Sewer-System-Management-Plan • Inspections: During inspections of FSEs, FOG inspectors provide educational materials on best management practices (“BMP”s) for grease traps and interceptors. Newly permitted FSEs also receive BMP materials.

By engaging with the community and FSEs through these activities, LACPW aims to promote effective FOG management practices and prevent blockages in the sewer system.

The City benefits from the LACPW community outreach benefits, and to complement the efforts, the City continues its own public education outreach programs through disseminating material to through City’s social media, website and business council. City personnel also

Page 144 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 39
disseminate information to residents during meetings or while conducting right-of-way lateral work inspections.

7.2.2 Plan and Schedule of Events
The schedule of outreach activities is based on opportunities for public engagement and the frequency of FSE inspections. When an opportunity arises for SMD or the City to participate in a public event, the County’s Community and Government Relations Group (“CGRG”) notifies them. Many of these events occur annually and SMD tries to be involved if notified by the CGRG in time to coordinate. CGRG keeps track of all the events the county participates in annually, providing a summary of events at the end of the year.

FSE Outreach is timed around FSE inspections. FSE owners are provided with educational material when FOG inspectors visit to inspect grease traps and interceptors and check for any violations.

7.3 Plan and Schedule for Disposal of FOG
For the disposal of grease and other pipe-blocking substances, FSE’s must obtain a Domestic Waste Clearance permit from City PW that requires a schedule of frequent maintenance and documentation of maintenance and disposal of waste. Under the permit, grease traps are required to be maintained/pumped at the frequency required to prevent overflows, while grease traps/interceptors that can handle 750 gallons or greater require quarterly maintenance. FSEs are required to log their frequencies of maintenance and submit upon request by the City PW.

The solidified fats found in the City’s collection system during cleaning operations are trapped, collected, and taken to the maintenance yard dump bins. Once the bins are full, these and other debris collected from the system are taken to the County Sanitation Districts of Los Angeles County facilities.

7.4 Authority to Prohibit FOG Discharges and Identify
Measures to Prevent FOG Spills

7.4.1 Authority
The legal authority and mandate to prohibit discharges of FOG into the sewer system is discussed in Chapter 3 of this document. Requirements for grease interceptors at food establishments to prevent the discharge of grease to the collection sewer system and educating the public on proper disposal methods for FOG are also discussed in this chapter.

7.4.2 Preventative Measures
The LACPW, on behalf of the City, utilize semiannual manhole inspections of all manholes and the scheduled and unscheduled sewer line cleaning, the television inspection of the interior of sewer pipes to identify pipe segments experiencing heavy grease accumulation, and in mitigating any problems. These legal mandates and maintenance practices are

Page 145 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 40
complemented by the City’s and LACPW’s Public Education and Outreach Program discussed in Section 7.1 to minimize Spills and blockages caused by FOG.

7.5 FOG Program Requirements and Design Standards
A pretreatment system/device is required for any new and existing food service establishment or similar facility where FOG from food preparation is discharged into the sewer system in quantities that may cause blockages or interfere with sewage treatment or disposal. All pretreatment facilities, whether required by City PW or installed voluntarily, shall be maintained and operated under a valid DWWC for the operating life of the facility.

FOG program requirements are outlined in the DWWC Conditions and Limitations (Appendix G1) and are supported by the Pretreatment Guidelines For Restaurants And Food Service Operations.

7.5.1 Requirements to Install Grease Removal Devices
The City’s legal authorities to enforce the requirements stipulated in this Section are discussed in Chapter 3. The Director of Public Works/City Engineer has enforcement authority for industrial waste permitting per Section 20.36.040 of the LACO Code and City’s PW handles permitting and enforcement of inspections of food service establishments that discharge into the City’s sanitary sewer system. New or remodeled FSEs including those under new ownership, must also secure a DWWC permit from City PW. If there is a FOGrelated problem associated with a DWWC permit, the City will take enforcement action against the permittee. Enforcement actions include, but are not limited to the written Notices of Violations, order for pumping and cleaning of pre-treatment devices and cleaning of sewer laterals, as necessary. The City PW requires that domestic waste generating facilities of FOG and any FSE with the potential to produce grease install a grease control device (“GCD”).

The LACO Code prohibits the discharge of “any material, which may create a public nuisance, or menace to the public health or safety, or which may pollute underground or surface waters, or which may cause damage to any storm-drain channel or public or private property” (Section 20.36.010). If during inspection of the sanitary sewer system City personnel or contracted consultants determine that a FOG-related problem exists and is traceable to a domestic sewage source of such character that is not satisfactory, under the LACO Code (section 20.20.100), pretreatment could be required or the discharge required to be eliminated. Domestic waste containing FOG can lead to spills, which are public nuisances and is a violation of California Health and Safety Code Division 5, Part 3, Chapter 6, Article 2, which can also be used to impose appropriate domestic sewage discharge requirements.

7.5.2 Design Standards for Grease Removal Devices
FSEs are required to size, design and construct grease traps and interceptors according to the latest LACO Plumbing Code. Additionally, they are required to be approved, installed, and operated in a manner to control discharges of FOG into the sanitary sewer system and to ensure that the facilities do not create nuisances, menaces to the public

Page 146 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 41
peace, health or safety hazards, or adverse impacts to the public sewerage system, soil, underground, and/or surface waters.

The DWWC online page on the City’s website provides standard drawings for grease pretreatment devices:
https://industryca.portal.opengov.com/categories/1072/record-types/6471

7.5.3 Maintenance Requirements
The DWWC Conditions and Limitations has a minimum maintenance frequency condition and a requirement to maintain the GCD in proper working order. During inspections, inspectors physically examine the GCD. If a grease interceptor (“GI”) is used, FSEs are required to open and inspect it. If issues are identified, they are documented, and a job order is created. The FSE signs off on the order and receives a receipt. If cleaning records are not provided, or if the GI cannot be accessed, the FSE must clean it by a specified time limit in the order. Permit conditions require:
• GIs to be cleaned at least once every three months
• FSEs with grease traps are required to perform daily maintenance

7.5.4 Best Management Practices Requirements

7.5.5 The Pretreatment Guidelines for Restaurants and Food Service Operations provide guidelines and best management practices for selecting and installing pretreatment devices. These guidelines outline the installation requirements for grease interceptors and offer a list of alternative pretreatment devices that can be used in lieu of a grease interceptor.

During inspections, inspectors verify whether best management practices are being followed, such as maintaining proper documentation, using adequate devices, and employing appropriate disposal methods. Inspectors may distribute flyers outlining the dos and don’ts of fog management and request that these flyers be displayed at workstations for workers to see.

7.5.6 Record Keeping and Reporting Requirements
As a condition of the DWWC permit, FSEs must record the maintenance of grease trap/interceptors on a maintenance log report. The log records date of the service performed, types of services performed, and person/company providing service.

Additionally, for any liquid or solid industrial wastes transported from the site, FSEs must obtain and keep copies of receipts for grease trap/interceptor maintenance and pumping for at least 180 days.

The maintenance log report and receipts shall be made available to the City upon request.

Page 147 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 42

7.5.7 Procedures
LACPW, on behalf of the City, implements the following procedure to identify and manage sections of the system impacted by FOG blockages:
• Identification: Sections impacted by FOG blockages are identified through regular inspections conducted by cleaning crews, CCTV inspections, and reports of spills.
• Investigation: Once identified, these sections are thoroughly investigated to assess the extent of the blockages and determine the appropriate actions needed to address them.
• Maintenance: Based on the investigation findings, a periodic cleaning schedule is defined and implemented for each affected section to ensure ongoing maintenance and prevent future blockages.

7.6 Inspection and Enforcement Program

7.6.1 Authority to Inspect Grease Producing Facilities
As discussed in Chapter 3 of this document, Section 20.36.400 of the LACO Code provides legal authority to inspect FOG-producing facilities, prohibiting the discharge of substances that may obstruct or require frequent maintenance of the sewer system. Section 17.36.080 of the City’s municipal code authorizes the Director of Public Works/City Engineer to issue a clearance for all domestic and permit for industrial waste discharges. This provides the Director of Public Works/City Engineer with the authority to inspect grease-producing facilities for compliance with permit requirements and pursue enforcement of any code violations.

The source control inspection process follows a standard workflow, including researching plans, preparing for the inspection, reviewing operations, and requesting GCD maintenance documentation. Inspectors may ask questions about waste oil management, changes in operations that affect the permit, and maintenance frequency. They also check for compliance with Best Management Practices such as ensuring BMP posters are visible in the kitchen. Inspectors document their findings and enter data into the City’s GIS database.

When SMD encounters, on behalf of the City, FOG issues in the collection system whether from spills CCTV inspections or sewer cleaning, the source of the problem is evaluated as either residential, commercial, or both. For residential spills, SMD or City Staff may notify residents door-to-door, providing information on proper grease disposal practices. For recurring issues, the affected area is placed on a preventive maintenance schedule.

In the case of commercial spills, the incident is referred to City PW for investigation. City PW checks GCD maintenance and requires corrective actions when needed. If a FSE without a GCD is responsible for a spill, City PW mandates the installation of a GCD. If FSE equipped with a GCD causes a spill, more frequent maintenance may be required.

All investigations are documented in the City’s GIS database, and results are communicated to SMD, as needed.

Page 148 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 43

7.6.2 Authority to Enforce
City PW inspectors will issue a Notice of Violation or Order to Comply with a set deadline.

Follow-up inspections verify compliance, and unresolved issues may be escalated to City Staff. Upon further non-compliance efforts by the FSE’s, compliance issues are referred to the City Manager’s office for further action.

7.6.3 Resource Plan to Inspect and Enforce
City PW has sufficient inspection and enforcement staffing to achieve an annual FSE inspection cycle and follow up on requirements and violations identified. City Staff will monitor current funding and budget for the future accordingly based on the year-to-year expenses related to inspection and enforcement.

7.7 Maintenance Program to Address FOG Issues
As described in Section 4, FOG prone sections of the Districts’ collection system, referred to as “hot spots,” are identified during routine maintenance operations and investigation of stoppages and spills in the City. These portions of the system found to have persistent FOG problems are put on monthly, quarterly, or semi-annual periodic cleaning schedule, depending on the magnitude of the problem. Furthermore, segments of the collection system with persistent FOG problems are referred to the Environmental Programs Division of the Department of Public Works for additional investigation and enforcement actions and discussed with the City for further enforcement and inspection.

7.8 Implementation of Source Control Measures to Address FOG Issues

7.8.1 Summary of Source Control Measures
Pretreatment devices are used to remove grease from sewage to prevent the accumulation of FOG that can lead to blockages. The City, in addition to the County SMD, provides pretreatment guidelines to FSEs, offering guidance on how to adequately select, size, and install a pretreatment device based on the amount of grease produced. The maintenance of these devices is outlined in the DWWC to ensure proper operation and functionality.

Under the DWWC, the City or County, in support of the City, may require upgrades to grease interceptors if maintenance is inadequate or if the interceptor is too small to handle the waste stream.

7.8.2 Summary of Source Control Program Enforcement
City PW conducts routine inspections of FSEs and inspects new establishments.

Investigations are also performed when spills occur. When the responding County SMD crew receives complaints and determines that FOG may have caused a spill or has the potential to cause a spill (e.g., grease accumulation), they reach out to City PW for further investigation. Upon investigation, the City may make adjustments to the DWWC permit and treatment requirements to prevent such incidents and/or place the impacted area under periodic maintenance as described in Section 4.2.7. Under the DWWC permit, the

Page 149 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 44
City, and with input from the County, may modify the DWWC permit and its conditions and limitations, as necessary, to ensure proper waste disposal.

Page 150 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 45
8 System Evaluation, Capacity Assurance and
Capital Improvements
The LACPW has implemented procedures for system evaluation, capacity assurance, investment prioritization, and capital improvement planning. This section documents the procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• Capital improvement planning.

8.1 System Evaluation and Condition Assessment

8.1.1 Best Practices and New Technology
LACPW uses CCTV as the primary tool for condition assessment of pipelines which is in accordance with industry standards for small diameter pipelines. Use of CCTV is the industry best practice for sewer pipeline condition assessment given the pipe size range (8-inch to 36-inch) the County owns and operates.

8.1.2 Amount of System Condition Assessment
Under the Condition Assessment Program (“CAP”), SMD plans to perform CCTV inspections at a rate of approximately 500 miles of sewer infrastructure each year starting in 2025. The complete cycle is scheduled to last a total of approximately 10 years, with the period between inspections dependent upon age and results from the last inspection.

Newer pipe segments found to be in good condition in the prior inspection will have a low priority in the next inspection cycle. SMD inspects all manholes twice a year.

8.1.3 Inspection and Condition Assessment Prioritization Historically, LACPWs CAP prioritized condition assessment projects based on jurisdiction/cities with ordering based on spill rate. The assessment prioritized sewer lines with the most potential for repair needs based on maintenance history, past overflow records, sewer line locations, and age. Based on the reissued General Order LACPW will incorporate additional factors into condition assessment prioritization. These include areas that:
• Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies; • Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas; • Are within the vicinity of receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List;

Page 151 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 46
The LACPW plans to develop and implement an approach to incorporate these factors into condition assessment prioritization by May 2027.

8.1.4 Inspection Methods
The LACPW uses CCTV inspection as the primary means for collecting visual observations of system conditions. This CCTV inspection program digitally records the condition of the pipe interior from manhole to manhole using a robotic camera tethered to a camera van.

While the video is being captured, a National Association of Sewer Service Companies (“NASSCO”) Pipeline Assessment and Certification Program (PACP) certified crew member views and logs events such as defects and observations using the standardized NASSCO PACP observation codes. With GraniteNet, the digital video inspections files are transferred via cloud enabling access to anyone with credentials and password access using a laptop or mobile device.

In addition to CCTV inspection, visual inspection is conducted on sewer facilities during sewer system maintenance activities. In the past, a field crew would document visual observations and system issues on a form to trigger follow up inspections and repair actions. With the implementation of Cityworks, field crews now provide these observations electronically using mobile devices for immediate communication to SMD Superintendents and Supervisors to trigger follow-on actions to address issues.

8.1.5 Utilizing Observations for Condition Assessment
The LACPW utilizes the NASSCO rating system to identify defects and observations using PACP observation codes. The City plans to continue using the NASSCO PACP condition rating for sewer pipelines and is planning to incorporate the MACP for manhole condition assessments. The LACPW prioritizes repairs of critical structural defects. These include NASSCO PACP Structural Grade 5 defects with potential for soil migration and undermining of pipe bedding leading to pipe movement and having potential for accelerated deterioration (i.e., pipe collapse, broken void visible, broken soil visible, hole void visible, hole soil visible, missing wall, and severe offsets impeding flow). These types of defects also have potential for leakage. Other less severe NASSCO PACP Structural Grade 5 and NASSCO PACP Structural Grade 4 defects are not prone to leakage due to collimation and sealing of the defects with sedimentation and biological growth.

Throughout Los Angeles County, historical rivers and creeks have been concrete-lined or replaced with storm drainage piping. The LACPW is not aware of any locations in the CSMD service area where there is potential for subsurface leakage reaching water of the State.

The LACPW also performs visual inspections weekly at pump stations to verify the pumps are performing well, are properly maintained, and are in compliance with standards. If issues are identified, they are addressed via a corrective maintenance work order or elevated to be included in a project.

Page 152 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 47

8.1.6 Inspection and Assessment Recordkeeping
LACPW documents and recordkeeping of system evaluation and condition assessment inspections and activities have historically been maintained using WinCan software with videos stored on LACPW servers. LACPW recently transitioned to using GraniteNet, a cloud-based CCTV software, which will enable access to CCTV data and videos to anyone with password access and credentials from mobile devices or laptops connected to the internet.

In the past, when field crews conduct visual inspections during maintenance activities, system deficiencies requiring action were recorded as footnotes on forms for replacements, repairs, and issue identification. Once the Cityworks is implemented, field crews can use mobile devices to document these issues in the Cityworks Maintenance Management System to better manage and keep record of findings and address issues.

8.1.7 Assessing Assets Vulnerable to Climate Change
The District’s service area has sections of the system that are susceptible to climate change impacts from flooding, landslides, wildfires, and power disruptions that may cause service disruptions. LACPW plans to develop and implement procedures to identify and address system assets vulnerable to direct and indirect impacts of climate change by November 2027, including but not limited to:
• Sea level rise
• Flooding and/or erosion due to increased storm volumes, frequency, and/or intensity
• Wildfires
• Increased power disruptions
LACPW has an overarching Emergency Response Plan for addressing large-scale emergency events. These procedures provide comprehensive guidelines for personnel to effectively respond to various emergency situations including communication directives, preparatory assignments, and specific actions for different types of emergencies.

Specific Emergency Procedures related to climate change include:
• Earthquake Response Procedures
• Fire Response Procedures
• Storm Response Procedures
• Electrical Power and Telecommunication Outage
• Tsunami (Large Wave) and High Tide Procedures
• Sewage Leakage and Overflows
• Air Pollution Emergency Response Procedures
• Land Movement and Rockslide Response

Page 153 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 48

8.2 Capacity Assessment and Design Criteria

8.2.1 Gravity Facilities
The City is responsible for confirming that newly constructed pipelines are constructed with adequate hydraulic capacity. A study is required for each development to analyze the capacity of the existing system and will set forth mitigation requirements for developers to ensure adequate capacity sizing of proposed sewer lines to accommodate the current design and future base, peak, and wet weather flows.

CSMD member cities are responsible for capacity assurance within their jurisdictional boundaries.

A preliminary assessment determines whether a sewer area study is required, based on zoning and acreage to estimate the load. If the estimated load exceeds thresholds, a sewer area study is triggered. Sewer load calculations are lot-based, determined using parcel size and zoning type. A standard measure, such as cubic feet per second (cfs) per acre, is used, with flow rates varying by zoning type. This methodology results in sewer lines are designed to handle the specific load for each parcel. Increased densification due to new zoning or development to full capacity may necessitate resizing existing sewer pipes.

For all new projects impacting the capacity of the public sewer system, the LACPW requires the submission of a sewer area study. The capacity assessment assumes an ideal system with no illegal connections and uses a design criterion of ½-full pipe capacity as adequate for lines smaller than 15-inch in diameter, and ¾-full pipe for lines 15-inch and greater. Reports are submitted and reviewed through a plan check process.

The sewer area study procedure and support materials for the unincorporated areas of Los Angeles County can be found on the Land Development Division website:
• https://pw.lacounty.gov/ldd/lddservices/sewerAreaStudy/sewerAreaStudy.shtml The City is responsible for ensuring that the public sewer infrastructure is correctly designed, adequately sized, and easily maintained. LACPW provides a supporting role in reviewing all proposed sewer plans for new developments in the City to ensure that they conform to LACPWs design standards and to ensure that requirements for acceptability for maintenance are met.

The Director of Public Works/City Engineer or hired qualified private company provides thorough review of all sewer plans for proposed development projects in the City to ensure that (1) they are properly designed with sufficient capacity for current and future base, peak, and wet-weather flow demands; and (2) any impact of proposed project on existing sewer system is mitigated prior to being approved by the Director of Public Works/City Engineer. During construction, the projects are continuously inspected by the Director of Public Works/City Engineer or hired construction inspectors to ensure that sewer facilities are constructed in accordance with the approved plans and specifications.

8.2.2 Pressure Facilities
Pump stations within the City and LACPW are designed for full buildout and include redundancy in controls and pumping systems. If developers seek to connect additional

Page 154 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 49
tracts, they must hire an engineer to evaluate the pump station’s capacity needs. Flow studies are conducted on a case-by-case basis through the permitting process. Sewer line flow measurements are performed to assess the capacity of lines suspected of being surcharged. These measurements are straightforward for established sewer systems, though more remote systems require additional permissions for access.

8.2.3 Infiltration and Inflow
The assessment of increased infiltration and inflow (I/I) is conducted in collaboration with LACSD. LACSD performs studies to identify sources of I/I into their system, which may include LACPWs collection systems, potentially triggering an assessment of LACPWs system. Mitigation strategies include sealing manholes and sewer lining, LACPW with LACSD providing the sealant and lining materials. Additionally, LACSD and LACPW develop a list of manholes affected by I/I. LACSD typically requests that manholes be sealed and peepholes corked. Sampling and analysis are performed as needed.

8.2.4 Erosive Forces in Canyons and Streams
The LACPW mitigates erosive forces for pipelines crossing or near rivers and streams by requiring these pipelines to be concrete encased. The methods of encasement are defined in LACPWs Design Standards Manual.

8.2.5 Design Flow and Weather Events
The system is designed according to LACPWs Design Standards to accommodate dry weather peak flow conditions and design storm and wet weather events. Approximately 91 percent of pipelines in CSMD system are 8-inch vitrified clay pipes and approximately 8 percent are 10-inch to 15-inch diameter. The City has approximately 55 percent of pipes that are 8-inch vitrified clay pipes, approximately 44 percent are 9-inch to 18-inch diameter, and approximately 1 percent is 19-inch to 36-inch diameter. These pipelines collect flows from small sewer catchment areas and convey the flows to the nearest LACSD trunk sewers for conveyance to an LACSD treatment plant for treatment and disposal.

8.2.6 Capacity Assessment Data
When performing sewer capacity studies within the City’s boundary, developers can obtain reference data for the development of sewer studies and capacity assessments directly from the City. LACPWs Land Development Division (“LDD”) can assist upon request from the City.

When performing sewer capacity studies within the unincorporated areas of Los Angeles County, developers can obtain reference data for the development of sewer studies and capacity assessments on LDD’s website. The website provides guidance on the approval process, links to information such as as-builts and sewer locators, and examples of required documents. If contractors need additional information, they may reach out to LDD directly to request any additional materials.

The LDD collects, maintains, and archives all sewer studies and flow data performed, and can provide this information upon request. Additionally, LDD has access to and can provide information as needed from sewer pipeline condition assessments, system

Page 155 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 50
inspections, spill history, and other available data used to assess system deficiencies and identify necessary system repairs and rehabilitation.

There is no pump station located within the City.

8.2.7 Capacity Enhancement Plan
The Sewer Collection System Capacity Enhancement Program is a combined effort between the City and LACPW. LACPWs Capacity Enhancement Plan focuses on managing infiltration and inflow (I/I) by requiring proper system design through plan checks, careful inspection during construction, and the use of appropriate pipe materials.

After installation, multiple strategies are employed to identify and eliminate I/I sources where feasible. Detection strategies include visual inspections, CCTV, and smoke and dye testing.
• If the sources are due to illicit connections such as sump pumps, roof drainage, surface water diversion into a manhole, etc., applicable laws are enforced to eliminate them.
• Significant structural issues like collapses, breaks, holes, or severe offsets are corrected through repair, replacement, or lining.
• Maintenance issues such as grease accumulation and debris are addressed through regular sewer line cleaning, and flow measurements are used to assess the capacity of sewer lines suspected of surcharging.

8.3 Prioritization of Corrective Actions
LACPW prioritizes corrective action based on:
• Likelihood of failure which is determined from findings of condition assessment (e.g., prioritizing NASSCO PACP rating, 4 and 5) and;
• Consequence of failure (e.g., proximity to water body, railroad, road type, and easement)
• Areas with multiple priority segments to factor in areas to be repaired at a time Based on the condition grading and observed defects, LACPW prioritizes sewer segments for remediation. NASSCO PACP Structural Grade 5 defects are significant structural deficiencies. Pipe segments with these defects are placed on a repair list with the highest priority focused on pipes with NASSCO PACP Structural Grade 5 defects prone to accelerated deterioration. Sewer repairs are also prioritized based on maintenance history, past overflow records, sewer line locations, and age as they contribute to the likelihood and severity of spills.

8.4 Capital Improvement Plan
Responsibility for capital improvements varies based on the type of improvement required.

For new sewer installations, collection systems owned by the Cities receive funding from the City. New connections and capacity-related improvements in unincorporated areas are funded and constructed by the developers, including construction contracting (refer to

Page 156 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 51
Section 8.2). The County provides oversight throughout the design and construction of the capacity related improvements, including review and acceptance during permitting, design reviews, and construction. The Design Division is responsible for developing the design criteria for CIP projects, and Project Management Division III manages the development, design and construction. The Land Development Division manages the County Improvement Projects in unincorporated areas, including tracking budget, scope, and schedule.

The City manages their own CIP schedule, tracking budget, scope, design, and construction of new connections and capacity-related improvements within their boundary.

For rehabilitation and repair, the Districts manage and funds projects for both City systems and unincorporated areas. The Districts focuses on lining and emergency point repairs for damaged pipes to maintain operations and reduce the risk of sewer spills.

Most repairs are delivered through on-call contracts, including work on gravity mains, force mains, pump stations, and treatment plants. The Accumulative Capital Outlay Program (ACO) and special zones fund the repair and maintenance of SMD facilities.

8.4.1 Accumulative Capital Outlay Program
The Accumulative Capital Outlay (“ACO”) Program fund was established in 1987 as a mechanism to pay for sewer pipe replacements, relief sewer construction, and maintenance improvements to sewage pumping stations. The objectives of the fund are to establish a charge to be collected from each parcel of real property in the CSMD and utilize these monies for sewer line repair and rehabilitation projects (emergency or scheduled).

Additionally, some deteriorated lines are discovered during preventive maintenance of our sewer lines. These lines are either immediately repaired by force account, using emergency contractors, or added to the list of future ACO projects. Table 8-1 lists the contracts under the ACO program as of May 5, 2025.

All sewer pipe segments within the District’s service areas found to have significant structural deficiencies will continue to be repaired or rehabilitated under the ACO program.

Table 8-1: ACO Program Contract List (County Only)
Projects Name Amount Start Date End Date
Fountain Springs Pump Station 1,214,199 Sept, 2026 Sept, 2028 San Dimas Pump Station 1,214,199 January, 2026 April, 2027 On-Call As-Needed Contract 62,202,057 Est. July 2025 Est. July 2030

8.4.2 Joint Coordination and Interagency Coordination
The majority of collection system improvements are managed by Sewer Maintenance Division staff using resources from on-call contracts for planning, design, and

Page 157 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 52
construction. In some cases, projects are managed by PMD III. In either case, coordination between operation and maintenance staff, County engineering staff, consultants and contractors occur throughout the planning, design and construction phases of project delivery. Project delivery incorporates coordination meetings and milestone deliverable reviews by all stakeholders.

Early in the project delivery process, impacted agencies and entities are identified to initiate communication and permitting to streamline project delivery. This includes communication and coordination with CSMD Cities if the work is being performed on their collection system. Another primary impact agency is LACSD, since there are numerous connections between LACPWs collection systems and LACSD trunk sewers. LACPW also coordinate with the City of Los Angeles and Las Virgenes when necessary, when working in areas where their systems connect to LACPWs systems.

Other impacted entities can include Army Corps of Engineers, Department of Fish and Wildlife, railroads, schools, neighboring cities, or CSMD member cities. Collaboration helps align project planning, and resource allocation for engineering, design, and construction. Regular communication, data sharing, and joint meetings support the coordination of timelines, permitting, and infrastructure improvements while reducing conflicts across jurisdictions. All coordination of stakeholders and community engagement is managed by LDD staff.
9 Monitoring, Measurement and Program
Modifications

9.1 Maintenance of Information to Prioritize SSMP Activities Relevant information for prioritization of SSMP activities is collected in an array of information systems, databases, and spreadsheets.
• WinCan and GraniteNet are used to video and log events from CCTV inspection.

WinCan is the legacy repository. LACPW recently implemented GraniteNet and will be using GraniteNet for all future inspections.
• Historically, LACPW documented maintenance activities in the field using paper forms and work orders and later entered into Maximo. LACPW is transitioning from Maximo to Cityworks for management of maintenance activities. The implementation of Cityworks will streamline data collection and improve asset management efficiency.
• FOG inspection activities are recorded on paper and stored in the HMS database. • Spill data is stored in the State Water Resources Control Board’s CIWQS database and SMD internal PowerBI database. Productivity reports documenting and summarizing the work performed per City can be generated by PowerBI. • Previous audits findings are documented in an Audit Progress Tracker updated by SMD staff.

Page 158 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 53
Table 9-1: Information Systems Relevant to SSMP Implementation and Monitoring System Description of Primary Functions Related SSMP Activities Maximo Maintenance management system for
managing maintenance activities. Field crew
activities are recorded in various forms and
stored in the MMS. LACPW is transitioning to
Cityworks
• Managing and recording work
orders and maintenance activities
Cityworks Maintenance management system to
schedule and track maintenance, condition
assessment and FOG activities
• Used to plan, schedule, and track
work orders and activities for
maintenance
• Recording CCTV videos and
condition assessment findings
• Managing FOG source control
inspections
GIS Database Asset database of record, including asset
attribute information such as material type,
diameter. Represents asset physical location
spatially
• Creating and maintaining maps of
sewer features and related
infrastructure
CADD Database Database of as-built plans of the city’s
facilities
• Storing and managing as-built
plans and system data
Productivity Report (Power BI) Maintains record of all spills that occur in the system. Display spill trends and analysis
• Generating spill analysis reports
and figures
• Analyzing and displaying spill
trends
• Documenting and summarizing
the work performed per city
CCTV Log (database) Videos and log CCTV events, serving as the repository for historical CCTV inspection data
• Recording and maintaining CCTV
inspection data
Community Profiles (Power BI) Cities profiles with detailed information on population, manholes, pipes, pump stations,
and properties
• Records detailed city’s profiles
that summarizes the infrastructure
within each city
• Generating service area overview
and breakdown
Supervisory Control and Data
Acquisition (SCADA) system
Tracks pumping plants operating, alarm, and
instrumentation data
• Monitoring real-time performance
of pumping plants to trigger
maintenance action
• Collecting and storing pump
station data
HMS Database Maintain records of all sites and locations under the FOG program. Tracks permits,
inspection, investigations, and records
source control data
• Documenting past inspections
and investigations
• Records permits, and
investigation and inspection
findings
• Creates notices for FSEs and
inspections schedules
Microsoft Office Used to manage various collection system programs as an electronic database.

Currently stores the schedule for FOG
program activities, transitioning to Cityworks.
• Managing schedules and data for
FOG program activities
Audit Progress Tracker Spreadsheet listing past audit findings used to document corrective actions, task leads,
deadlines, and progress.
• Document audit findings and
corrective actions
• Tracking implementation to
address audit findings

Page 159 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 54

9.2 Monitoring of Implementation and Effectiveness of the SSMP
The City and LACPW monitor the implementation and effectiveness of the SSMP through coordination of SMD staff and collection supervisors. The effectiveness of the program is primarily monitored and tracked by overall sewer overflow performance such as amount of sewer spills, spill response time, and reduction of repeated spills.

Monthly meetings between SMD Superintendents and Supervisors focus on discussing safety procedures, operational and personnel issues, and the status of spills. Additionally, productivity reports on Power BI are reviewed to track progress in meeting inspection and maintenance targets, which are set and monitored by the superintendents.

Collection supervisors meet bi-weekly to go over status and tracking of maintenance activities. These meetings serve as a forum to facilitate communication between SMD Management and SMD Superintendents and Supervisors.

9.3 Program Audits
Every three years, LACPW and the City perform an internal audit of the SSMP and the SSMP program implementation. The various LACPW and City’s divisions and positions responsible for SSMP implementation, as identified in Table 2-2a and 2-2b, are involved in the audit. Each element of the SSMP is reviewed for effectiveness towards reducing the frequency and/or mitigating the impacts of spills and for compliance with the General Order requirements. Corrective actions to address identified deficiencies are prioritized, scheduled and incorporated into division plans.

9.4 Assessment of Preventative Maintenance Program
LACPW assesses the success of its Preventative Maintenance Programs by monitoring spill trends and spill events to identify improvements in their operation. By keeping track of sewer blockages and overflow, LACPW can respond with the appropriate corrective measure and program adjustments.

9.5 Identification and Illustration of Spill trends
Data acquisition, analysis, and management of sewer spills is supported by a dynamic information management system. Spill data is visualized in SMD’s PowerBI database which allows for the identification and tracking of spill trends. PowerBI can generate spill analysis reports and figures, illustrate these trends and provide the metrics needed to identify spill trends and evaluate the overall success of the SSMP program.

This system enables LACPW to review spill performance based on frequency (seasonal variations, year-over-year comparisons), location (known problem areas, system characteristics such as pipe material and installation timeline), and volume (totals reaching surface waters, average volumes, and changes over time, which can indicate the effectiveness of response times).

Page 160 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 55

9.6 Approach to Program Modifications and Plan Updates
The City and LACPW update the SSMP every six years. The update consists of:
• Reviewing the existing SSMP language and updating any outdated information.

This includes updates to staff positions, names and organizational lines of authority that have changed, changes to system characteristics such as basin areas, etc. • Incorporation of the adopted and implemented recommendations from previous SSMP program audits.

Upon completion of the six-year SSMP update, the SSMP is provided to the Board of Supervisors by LACPW and to the City Council by the City with a request for approval.

Upon acceptance by the Board for LACPW SSMP update and City Council for the City’s SSMP update, the SSMP is uploaded to the State Water Board CIWQS database and certified. SMD also posts the SSMP on the LACPW webpage and City also posts their SSMP on City’s webpage.

Page 161 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 56
10 SSMP Program Audits
LACPW and City audit the SSMP and program implementation to identify actions for improving how it manages, operates, and maintains the collection system. This process identifies the tasks and actions that are required to meet SSMP goals and defines and prioritizes them. Cities are responsible for either performing their own SSMP development and audits on their collection systems or requesting support from CSMD to complete their audit through a City Service Request.

10.1 Schedule of Program Audits and Updates
LACPW and City perform an internal audit of its SSMP every three years in accordance with General Order requirements. Every six years, LACPW and City update and recertify the SSMP. Table 10-1 shows the anticipated schedule for SSMP audits and updates for the next six years.

LACPW provide operation and maintenance services for the City’s sewer facilities; therefore, some components of the City’s audit and SSMP may be similar to LACPWs audit and SSMP update prepared in group 1.

Table 10-1: SSMP Audit and Update Schedule
Collection System Group Audit Due Audit Due Update Due
Unincorporated County Area CSMD South/County
Sanitation District CS
1 11/2/2027 11/2/2030 5/2/2031
CITY OF INDUSTRY, 4SSO10397 4 2/2/2029 2/2/2032 8/2/2032

10.2 SSMP Audit Process
The City’s Director of Public Works and SMD Division Manager assemble division staff and field crew personnel to perform an internal audit in accordance with the General Order requirements for Sewer System Management Plan Audits. Over the course of approximately three months, the audit team, including representatives from the divisions responsible for each SSMP section, conducts a series of in-person meetings to evaluate the effectiveness of each SSMP Part and Sub-part, identify any deficiencies, and make recommendations for improvements and updates. This process involves reviewing the program documentation in the Sewer System Management Plan, assessing current procedures and practices employed by staff, and discussing potential program modifications to enhance program effectiveness.

10.3 SSMP Audit Report
The findings from the SSMP audit are documented in an audit report. The audit report includes the following elements:
• Audit findings and recommended corrective actions;

Page 162 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 57
• A statement that sewer system operators’ input on the audit findings has been considered; and
• A proposed schedule to address identified deficiencies Once the audit report is complete, a quality check review of the audit report is performed, with a focus on consistency and completeness. The final audit report is reviewed by the CSMD and City’s LRO before final acceptance. Audit reports and related materials are maintained in a hard copy and an electronic document tracking and management system.

Copies of the SSMP will be maintained in the SMD’s Alhambra Headquarters Office and all SMD Maintenance Yards and posted in the LACPWs internet site. A copy of the City’s SSMP will be maintained by the City’s Director of Public Works at 15625 Mayor Dave Way in the City of Industry and posted on City’s webpage. The document shall also be made readily available to State Water Resources Control Board or Regional Water Quality Control Board representatives upon request, to all CMSD Cities, and to the operators of any collection system or treatment facility downstream of the LACPWs system.

10.4 Audit Implementation and Tracking of Results
The SSMP program audit recommended corrective actions are incorporated into the CIP development and budgeting process to provide the necessary resources to implement audit corrective actions and recommendations. Through that process, implementation progress is measured and reported on an ongoing basis to ensure timely completion of corrective actions. Deficiencies in meeting the schedule are identified or anticipated and mitigation measures developed and implemented to manage completion of the corrective actions from the audit. Each subsequent audit update begins with a review of the previous audit to determine if the corrective action remains relevant and, if so, to reiterate the program deficiency and recommended corrective action in the current SSMP audit report.

Page 163 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 58
11 Communication Program
LACPW employs a variety of means for communicating with the public and contract agencies on the development, implementation and update of the SSMP. The following sections describe LACPWs procedures for:
• Communicating with the public for spills and discharges resulting in closures of public areas, or that enter a source of drinking water. • Communicating with the public on the development, implementation, and update of its SSMP, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including tributary systems, for system operation, maintenance, and capital improvementrelated activities.

11.1 Procedures to Communicate with Public for Spills and Discharges
LACPWs procedures for communication with the public for spills and discharges are included in the Spill Emergency Response Plan in Appendix F. Chapter 3 of these procedures provides instructions for communicating with the public when spills result in closure of public areas or enter a source of drinking water.

Within 15 minutes of receiving confirmation that a spill with the potential to reach a storm drain or public waterway has occurred, LACPWs Field Crew must contact Los Angeles County Department of Public Health through LACPWs Operator. The Department of Public Health will post and remove signage for waterways and beach closures as required and will not remove the signs until the effects of the spill have been mitigated. A public press release will be made of the temporary closure due to a spill.

11.2 Procedures for General Communication with Public on SSMP
LACPW provides operation and maintenance services for the City’s collection system. The City also benefits from the educational and informational materials that LACPW provide to their service areas. The City provides the following information to the public on their webpage: https://www.cityofindustry.org/179/Sewer-System-Management-Plan • Current SSMP
• LACPW website
• LACPW Help line for sewer related issues
• City Hall phone number and email address for inquiries LACPW provides the public and residents in its service areas with educational and informational materials related to the sewer collection system and the sewer maintenance services the County provides. LACPW relies heavily on SMD’s webpage on the LACPWs

Page 164 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works
| 59
webpage to provide the public with ample information regarding the SSMP and SSMP program implementation: https://dpw.lacounty.gov/smd/smd/index.cfm The following information is publicly accessible on the LACPWs webpage:
• Current SSMP
• SSMP Audit Report
• Interactive sewer mapping provides the public with a means to find the sewer map and sewer pipeline servicing their property
• Annual performance reports
• Condition assessment reports
• FOG best management practices
• Homeowner responsibilities
• Outreach Brochures (in multiple languages)
• Answers to frequently asked questions (in multiple languages) • LACPWs webpage provides a “Contact Us” link providing the public with a phone number for inquiries, an 800 number for emergencies and a mailing address for written inquiries.
• To report urgent problems, LACPWs webpage provides an emergency contact link:
o https://pw.lacounty.gov/Contact/#emergencyInfo
The public can provide feedback on the SSMP and the performance of the Districts using the online survey located on the LACPWs Webpage:
• https://ladpw.org/general/survey/index.cfm?pid=ISBQICAK

11.3 Procedures to Communicate with Connecting Systems
and Contract Agencies
LACPW is in constant communication with entities that are connected to the system for operations, maintenance, and spill response related activities including the City of Los Angeles, LACSD, and member cities. For all agencies, SMD communicates with the agency when capital improvement-related activities will impact each other's system. Email broadcasts are sent to member cities to provide updates and communicate deadlines such as audit due dates. The City of Los Angeles also exchange emails with LACPW monthly for mainly billing and flow metering. LACPW maintains constant communication with LACSD, ensuring that at least one of the Districts’ staff serves as the main point of contact.

Additionally, SMD staff also will communicate directly with District staff when necessary for coordination.

Page 165 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix A1 - Governing Board Approval

Page 166 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix A2 – State Water Resources Control
Board - General Order for Sanitary Sewer
Systems

Page 167 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Page 168 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix A3 – Asset Summary Per Collection
System

Page 169 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix B1 – List of Staff Responsible for
Implementing Specific Elements of the SSMP

Page 170 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Page 171 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix B2 – City and Sewer Maintenance
Division Staff Contact Sheet

Page 172 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Page 173 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix C – Not Used
Reserved for future attachments associated with SSMP Element 3 – Legal Authorities.

Page 174 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix D – Field Operations Yard and Pump
Station Map

Page 175 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix E – Not Used
Reserved for future attachments associated with SSMP Element 5 – Design and Performance Provisions.

Page 176 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix F – Spill Emergency Response Plan

Page 177 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix G – IDWP Conditions and Limitations

Page 178 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix H – Not Used
Reserved for future attachments associated with SSMP Element 8 – System Evaluation, Capacity Assurance and Capital Improvements.

Page 179 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix I – Not Used
Reserved for future attachments associated with SSMP Element 9 – Monitoring, Measurement and Program Modifications.

Page 180 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix J – Not Used
Reserved for future attachments associated with SSMP Element 10 – Internal Audits.

Page 181 of 211 ends

Sewer System Management Plan
City of Industry /Los Angeles County Public Works

Appendix K – Not Used
Reserved for future attachments associated with SSMP Element 11 – Communication Program.

Page 182 of 211 ends

NOTICE OF EXEMPTION
To: County Clerk
County of Los Angeles
Environmental Filings
12400 East Imperial Highway #2001
Norwalk, CA 90650
From: City of Industry
15625 Mayor Dave Way
City of Industry, CA 91744
Project Title: Sewer System Management Plan
Project Location - Specific: City of Industry
Project Location-City: City of Industry Project Location-County: Los Angeles Description of Project: 2026 Sewer System Management Plan for the City of Industry Name of Public Agency Approving Project: City Council, City of Industry Name of Person or Agency Carrying Out Project: City of Industry and Los Angeles County Department of Public Works/Sewer Maintenance Division
Exempt Status: (check one)
 Ministerial (Sec. 21080(b)(1); 15268);
 Declared Emergency (Sec. 21080(b)(3); 15269(a));
 Emergency Project (Sec. 21080(b)(4); 15269(b)(c));
 Categorical Exemption. State type and section number: 15301 and 15308  Statutory Exemptions. State code number:

Reasons why project is exempt: This project is subject to review under the California Environmental Quality Act (“CEQA”), however, it is exempt pursuant to Section 15308 of the CEQA Guidelines, and Section 15301. As set forth above, the Los Angeles County Department of Public Works is responsible for all operation and maintenance activities of the City’s sewer collection system. The City is not responsible for any operation, maintenance or construction activities related to the system. Further, the plan does not explicitly commit the City to future construction or maintenance activities. Pursuant to Section 15308 of the CEQA Guidelines, actions taken by regulatory agencies to assure the maintenance, restoration, enhancement, or protection of the environment where the regulatory process involves procedures for protection of the environment, are exempt from CEQA. Under the instant circumstances, the SSMP is mandated by the State Water Board to minimize future sewer system overflows in the City, thereby reducing water quality issues that could pose serious health and safety issues. Given that the SSMP is adopted for the purpose of protecting the environment, it is exempt under Section 15308.

Further, because the SSMP applies to an existing sanitary collection system, and its implementation may result in the repair or replacement of existing systems involving negligible or no expansion of capacity, the SSMP is exempt from CEQA pursuant to Section 15301 of the CEQA Guidelines.

Lead Agency
Contact Person: Mathew Hudson Telephone: (626) 333-2211 Signature: Date: July 23, 2026
Title: Director of Public Works

Page 183 of 211 ends

ITEM NO. 6.6

Page 184 of 211 ends

MEMORANDUM
TO: Honorable Mayor and Members of the City Council
FROM: Joshua Nelson, City Manager
STAFF: Yamini Pathak, Finance Director
DATE: July 23, 2026
SUBJECT: Consideration of Amendment No. 1 to the Professional Services Agreement with NHA Advisors, LLC, for financial advisory services to the City, increasing compensation by $200,000.00
Background:

NHA Advisors, LLC (“NHA”) has provided financial advisory services to the City and its related entities since 2015. NHA assists the City in preparing documents to establish the applicable tax rate to generate sufficient property tax override revenue to pay the City’s outstanding general obligation bonds, along with developing reports to administer the outstanding bonded debt while identifying opportunities for outstanding debt. NHA also acts as a liaison for the City in communicating with Moody’s to ensure the City’s bond rating is up to governmental standards, provides general financial assistance in both development and utility finance, and in reviewing development plans for financeable components.

Discussion:

On June 26, 2025, the City Council approved a new Professional Services Agreement (“Agreement”) with NHA for financial advisory services, for a not-to-exceed amount of $50,000.00, through June 30, 2030. Amendment No. 1 increases compensation by $200,000.00 for a total amount not-to-exceed $250,000.00, and the annual amount per fiscal year will not exceed $50,000.00.

Fiscal Impact:

The cost for financial advisory services is included in the annual budget under General Fund – Finance– Professional Services (Account No. 100-506-5120.01). No appropriation is needed at this time.

Recommendation:

Staff recommends that the City Council approve Amendment No. 1 to the Professional Services

Page 185 of 211 ends

Agreement with NHA.

Exhibits:

1. COI NHA Advisors PSA Amendment No. 1

2. NHA ADVISORS LLC PROFESSIONAL SERVICES AGREEMENT JUN 26 2025

Page 186 of 211 ends

1 AMENDMENT NO. 1

TO PROFESSIONAL SERVICES AGREEMENT WITH
NHA ADVISORS, LLC.

This Amendment No. 1 to the Professional Services Agreement (“Agreement”), is made and entered into this 23rd day of July, 2026 (“Effective Date”), by and between the City of Industry, a municipal corporation (“City”) and NHA Advisors, LLC, a California limited liability company (“Consultant”). The City and Consultant are hereinafter collectively referred to as the “Parties”.

RECITALS
WHEREAS, on or about June 26, 2025, the City Council approved the Agreement with Consultant to provide financial advisory services to the City; and WHEREAS, the Parties desire to amend the Agreement to increase compensation by $200,000.00, for a total amount not-to-exceed $250,000.00, and the annual amount per fiscal year shall not exceed $50,000.00; and WHEREAS, for the reasons set forth herein, the City and Consultant desire to enter into this Amendment No. 1, as set forth below.

AMENDMENT
NOW, THEREFORE, in consideration of the mutual covenants, promises and agreements set forth herein, it is agreed the aforesaid Agreement, and incorporated herein by reference, shall remain in full force and effect except as otherwise hereinafter provided:

Section 4. PAYMENT
The second sentence of Section 4(a) is hereby revised in its entirety as follows:

This amount shall not exceed Two-Hundred Fifty Thousand Dollars ($250,000.00) for the total Term of the Agreement, and shall not exceed Fifty Thousand Dollars ($50,000) per fiscal year, unless additional payment is approved as provided in this Agreement.

The person or persons executing this Agreement on behalf of Consultant represents and warrants that he/she has the authority to execute this Agreement on behalf of the Consultant and has the authority to bind Consultant to the performance of its obligations hereunder.

[SIGNATURES ON FOLLOWING PAGE]

Page 187 of 211 ends

2 IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 1 to be executed as of the Effective Date.
“CITY” “CONSULTANT”
City of Industry NHA Advisors, LLC.

By: ________________________________ By: _____________________________ Joshua Nelson, City Manager Eric J. Scriven, Principal
Attest:

By: ________________________________
Julie Gutierrez-Robles, City Clerk

APPROVED AS TO FORM
By: ________________________________
James M. Casso, City Attorney

Page 188 of 211 ends

3 EXHIBIT A TO AMENDMENT NO. 1

PROFESSIONAL SERVICES AGREEMENT WITH NHA ADVISORS, LLC, DATED JUNE 26, 2025

Page 189 of 211 ends
Page 190 of 211 ends
Page 191 of 211 ends
Page 192 of 211 ends
Page 193 of 211 ends
Page 194 of 211 ends
Page 195 of 211 ends
Page 196 of 211 ends
Page 197 of 211 ends

Each right, power and remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otheruise shall be cumulative and shall be in addition to every other right, power, or remedy provided for herein or now or hereafter existing at law, in equity, by statute, or otherwise. The exercise, the commencement of the exercise, or the forbearance of the exercise by any party of any one or more of such rights, powers or remedies shall not preclude the simultaneous or later exercise by such party of any of all of such other rights, powers or remedies.

23. AUTHORIW TO EXECUTE THIS AGREEMENT
The person or persons executing this Agreement on behalf of Consultant represents and warrants that he/she has the authority to execute this Agreement on behalf of the Consultant and has the authority to bind Consultant to the performance of its obligations hereunder.
lN WTNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the Efiective Date.

By: nr]641,^-
,: osnH/6Eon, C ity-trlanagEr
"ctw"
Cig of lndustry
A
re Guti o es, City Clerk
Approved as to form
Ja M. Casso, City Attorney
Exhibit A
Exhibit B
Exhibit C
Exhibit D
..CONSULTANT''
NHA Advisors,
En Scriven, Principal
By
By:

Scope of Services
Rate Schedule
lnsurance Requirements
Disclosures
Attachments

Page 9 of 22 ends
Page 198 of 211 ends
Page 199 of 211 ends
Page 200 of 211 ends
Page 201 of 211 ends
Page 202 of 211 ends
Page 203 of 211 ends
Page 204 of 211 ends
Page 205 of 211 ends
Page 206 of 211 ends
Page 207 of 211 ends
Page 208 of 211 ends
Page 209 of 211 ends
Page 210 of 211 ends
Page 211 of 211 ends
← All documents from this meeting