Cities Index.
Agenda packet

Coachella City Council
October 12, 2022

Document
Agenda packet
Meeting
October 12, 2022
Body
Coachella City Council
Pages
371
Original file
46.9 MB
Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

Item 29.

A-6
80237.00000\19870870.1
shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its directors, officials, officers, employees, agents, and volunteers; or (2) the Consultant shall procure a bond guaranteeing payment of losses and related investigation costs, claims, and administrative and defense expenses.

3.2.10.7 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VIII, licensed to do business in California, and satisfactory to the City.

3.2.10.8 Verification of Coverage. Consultant shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Agreement on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms provided by the City if requested. All certificates and endorsements must be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

3.2.10.9 Reporting of Claims. Consultant shall report to the City, in addition to Consultant’s insurer, any and all insurance claims submitted by Consultant in connection with the Services under this Agreement.

3.2.11 Safety. Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life saving equipment and procedures; (B) instructions in accident prevention for all employees and subconsultants, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

3.3 Fees and Payments.

3.3.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit ”C” attached hereto and incorporated herein by reference. The total compensation shall not exceed Twenty-Five Thousand Dollars ($25,000) without written approval of the City’s Engineer. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

3.3.2 Payment of Compensation. Consultant shall submit to the City a monthly itemized statement which indicates work completed and hours of the Services rendered by Consultant. The statement shall describe the amount of the Services and supplies provided since

Page 326 ends

Item 29.

A-7
80237.00000\19870870.1
the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. The City shall, within 45 days of receiving such statement, review the statement and pay all approved charges thereon.

3.3.3 Reimbursement for Expenses. Consultant shall not be reimbursed for any expenses unless authorized in writing by the City.

3.3.4 Extra Work. At any time during the term of this Agreement, the City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by the City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

3.3.5 Labor Code Requirements.

3.3.5.1 Prevailing Wages. Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. The City shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant’s principal place of business and at the project site. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

3.3.5.2 Registration and Labor Compliance. If the Services are being performed as part of an applicable “public works” or “maintenance” project, then, in addition to the foregoing, pursuant to Labor Code sections 1725.5 and 1771.1, Consultant and all subconsultants must be registered with the Department of Industrial Relations (“DIR”).

Consultant shall maintain registration for the duration of the Project and require the same of any subconsultants. This Project may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll records directly to the DIR.

3.4 Accounting Records.

3.4.1 Maintenance and Inspection. Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of the City during normal business hours to examine, audit, and make transcripts or copies of such records and any

Page 327 ends

Item 29.

A-8
80237.00000\19870870.1
other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

3.5 General Provisions.

3.5.1 Termination of Agreement.

3.5.1.1 Grounds for Termination. The City may, by written notice to Consultant, terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Consultant of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Consultant shall be compensated only for those services which have been adequately rendered to the City, and Consultant shall be entitled to no further compensation. Consultant may not terminate this Agreement except for cause.

3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, the City may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of the Services under this Agreement. Consultant shall be required to provide such document and other information within fifteen (15) days of the request.

3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, the City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:

Consultant:

City:

Atlas Technical Consultants LLC
6280 Riverdale Street
San Diego, CA 92120
Attn: Mehrnoush Yavary, P.E., Director of Engineering
City of Coachella
53990 Enterprise Way
Coachella, CA 92236
Attn: Andrew Simmons, P.E., City Engineer
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.5.3 Ownership of Materials and Confidentiality.

Page 328 ends

Item 29.

A-9
80237.00000\19870870.1

3.5.3.1 Documents & Data; Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for the City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subconsultants to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subconsultant prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. The City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at the City’s sole risk.

3.5.3.2 Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents and Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant.

Such materials shall not, without the prior written consent of the City, be used by Consultant for any purposes other than the performance of the Services. Nor shall such materials be disclosed to any person or entity not connected with the performance of the Services or the Project.

Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use the City’s name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of the City.

3.5.4 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.5.5 Attorneys’ Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorneys’ fees and all other costs of such action.

3.5.6 Indemnification. To the fullest extent permitted by law, Consultant shall defend, indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any alleged acts, omissions or willful misconduct of Consultant, its officials, officers, employees, agents, consultants and contractors in connection with the performance of the Services, the Project or this Agreement, including without limitation the payment of all consequential damages, expert witness fees and attorneys’ fees and other related costs and expenses. Consultant shall defend, at Consultant’s own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every

Page 329 ends

Item 29.

A-10
80237.00000\19870870.1
kind that may be brought or instituted against the City, its directors, officials, officers, employees, agents or volunteers. Consultant shall pay and satisfy any judgment, award or decree that may be rendered against the City or its directors, officials, officers, employees, agents or volunteers, in any such suit, action or other legal proceeding. Consultant shall reimburse the City and its directors, officials, officers, employees, agents and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Consultant’s obligation to indemnify shall survive expiration or termination of this Agreement and shall not be restricted to insurance proceeds, if any, received by the City, its officials officers, employees, agents or volunteers. Notwithstanding the foregoing, to the extent Consultant’s Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant.

3.5.7 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified by a writing signed by both parties.

3.5.8 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Riverside County.

3.5.9 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.5.10 City’s Right to Employ Other Consultants. City reserves right to employ other consultants in connection with this Project.

3.5.11 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.5.12 Assignment or Transfer. Consultant shall not assign, hypothecate or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the City. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.

3.5.13 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Consultant include all personnel, employees, agents, and subconsultants of Consultant, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content or intent of this Agreement.

Page 330 ends

Item 29.

A-11
80237.00000\19870870.1

3.5.14 Amendment; Modification. No supplement, modification or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.5.15 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel or otherwise.

3.5.16 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.5.17 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.5.18 Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Consultant further agrees to file, or shall cause its employees or subconsultants to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Services. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.5.19 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subconsultant, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of City’s Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.5.20 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake selfinsurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5.21 Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

Page 331 ends

Item 29.

A-12
80237.00000\19870870.1

3.5.22 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

3.6 Subcontracting.

3.6.1 Prior Approval Required. Consultant shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.

CITY OF COACHELLA ATLAS TECHNICAL CONSULTANTS LLC
By: By:

Gabriel Martin Mehrnoush Yavary
City Manager Director of Engineering
APPROVED AS TO FORM:

Carlos Campos
City Attorney

Page 332 ends

Item 29.

A-1
80237.00000\19870870.1
EXHIBIT “A”

SCOPE OF SERVICES

Page 333 ends

Item 29.

B

SCHEDULE OF FEES
California Prevailing Wage
Effective February 1, 2021
Revised February 1, 2021

PROFESSIONAL SERVICES
Professional (Engineering, Geology, Environment, Envelope Services) Director/Principal Professional ................................................................................................................................. $190 Senior Professional....................................................................................................................................................165 Project Professional ...................................................................................................................................................145 Staff Professional.......................................................................................................................................................120 Drafter Level II..............................................................................................................................................................95 Drafter Level I...............................................................................................................................................................85 Project Management
Senior Project Manager ...........................................................................................................................................$160 Project Manager.........................................................................................................................................................135 Administrative Assistant ...............................................................................................................................................67 Field Services (Geotechnical, Special Inspection)
Field Supervisor ......................................................................................................................................................$118 LA Certified Grading Inspector ..................................................................................................................................123 Off Site Inspector .........................................................................................................................................................91 Laboratory Technician..................................................................................................................................................74 Group 1 (Field Soils, Material Tester) ........................................................................................................................108 Group 2 (Special Inspection)......................................................................................................................................113 Group 3 (NDT Testing)...............................................................................................................................................117 Coring ........................................................................................................................................................................166 Field Services (SUE Level B Utility Evaluations and Rebar Locating) Line Tracer, Ground Penetrating Radar, Electromagnetics, Magnetics Full Day ..........................................................................................................................................................$1,950 Hourly Rate (A Mob/Demob charge of $250 applies to projects billed on hourly rates).......................................215 Letter Report........................................................................................................................................................300 Map (per day of field work) ..................................................................................................................................350 Field Services (Geophysical Data Acquisition)
UST, Landfill, Oil Well, Void, Pile Integrity Testing
Full Day .........................................................................................................................................................$2,400 Hourly Rate (A Mob/Demob charge of $335 applies to projects billed on hourly rates).......................................270 Field Services (Advanced Geophysical Studies)
Seismic, Sting ERT, Resistivity, Groundwater, UXO/MEC
Full Day .........................................................................................................................................................$3,000 Hourly Rate (A Mob/Demob charge of $550 applies to projects billed on hourly rates).......................................325 Field Services (Seismic ReMi)
One Line.........................................................................................................................................................$1,500 Each Additional Line............................................................................................................................................300 For Pavement/Requires Drilling...........................................................................................................................300 Field Services (Vibration Monitoring)
Mobilization ....................................................................................................................................................$1,000 Equipment (Daily) ...............................................................................................................................................200 Daily Analysis & Reporting (Daily) ........................................................................................................................75 Final Report Preparation ....................................................................................................................................750 Manned Vibration Monitoring...........................................................................................................................Quote Field Services (Building Envelope)
Field Tech Level II....................................................................................................................................................$125 Field Tech Level I.......................................................................................................................................................115 Electronic Leak Detection (hourly, 4 hour minimum)..................................................................................................250 Fenestration Testing (ASTM E1105/E783) – Hourly Rate (2 technicians) ................................................................. 400 Fenestration Testing (AAMA 501.2) – Hourly Rate (2 technicians)............................................................................225 Drainage Efficiency of Exterior Insulation and Finish Systems (EIFS) Clad Wall Assemblies (ASTM E2273) .......1,500

Page 334 ends

Item 29.

ATLAS SCHEDULE OF FEES Page 2 of 4
Revised February 1, 2021
Travel and Miscellaneous
Pick Up ..............................................................................................................................................................$55/hour Travel Time ................................... Hourly Rate (or $125/hour beyond 1 hour from San Diego for Geophysical Crews) Overtime and Saturday Rate ..................................................................................................1.5 x Regular Hourly Rate Sunday and Nationally Recognized Holiday Rate (including the day after Thanksgiving) .........2 x Regular Hourly Rate Rush Surcharge .......................................................................................................................... Normal Rate plus 50% Per Diem (variable, depending on location) .......................................................................................................... Quote Prevailing Wage Hourly Surcharge for Technicians and Inspectors per California Labor Code §720, et. Seq .... Quote Specialty Equipment Surcharge ........................................................................................................................... Quote

LABORATORY TESTS
Soil and Aggregate
California Bearing Ratio (ASTM D854) ...................................................................................................................$418 California Impact (Cal 216) ........................................................................................................................................206 Clay Lumps in Aggregate (ASTM C142)....................................................................................................................150 Cleanness Value (Cal 227) ........................................................................................................................................200 Consolidation (ASTM D2435) ....................................................................................................................................200 Corrosivity Testing (Soluble Chlorides and Sulfates, pH and Resistivity)...................................................................187 Crushed Particles (Cal 205, ASTM D693)..................................................................................................................150 Direct Shear (ASTM D3080) ......................................................................................................................................260 Durability Factor (Cal 229, ASTM D3744)....................................................................................................................97 Durability Index (Cal 229, ASTM D3744) ...................................................................................................................224 Expansion Index (ASTM D4289)................................................................................................................................177 Fine Aggregate Angularity (AASHTO T304) ..............................................................................................................200 Fineness Modulus (ASTM C136) ................................................................................................................................. 24 Flat & Elongated Pieces (ASTM D4791)....................................................................................................................175 Light Weight Pieces (ASTM C123).............................................................................................................................175 Liquid Limit (Cal 204, ASTM D4318)............................................................................................................................75 Los Angeles Abrasion - 1 ½ inch and smaller (Cal 211, ASTM C131).......................................................................224 Maximum Density Check Point (ASTM D698/D1557)..................................................................................................88 Maximum Density/Optimum Moisture – 4 inch (ASTM D698, D1557)........................................................................200 Maximum Density/Optimum Moisture – 6 inch (ASTM D698, D1557)........................................................................220 Minimum Density (ASTM D1556)................................................................................................................................. 74 Moisture Content (Cal 226, ASTM C566, ASTM D2216) .............................................................................................35 Natural Density Chunk Sample (ASTM D2937) ...........................................................................................................45 Natural Moisture/Density Ring or Core Sample (ASTM D2937)...................................................................................40 Organic Impurities (Cal 213, ASTM C40).....................................................................................................................90 Organic Matter (ASTM D2974).....................................................................................................................................75 Percent Finer than #200 (ASTM C117, ASTM D1140) ................................................................................................70 Permeability Remold Sample (ASTM D2434) ............................................................................................................200 Permeability Remold Sample (ASTM D5084) ........................................................................................................Quote Permeability Undisturbed Sample (ASTM D5084) ................................................................................................. Quote Petrographic Analysis (Cal 215, ASTM C295) .......................................................................................................Quote pH & Resistivity (Cal 643, ASTM G51).......................................................................................................................126 Plasticity Index (Cal 204, ASTM 4318).......................................................................................................................127 Potential Reactivity (ASTM C289)..............................................................................................................................220 Residual Shear (ASTM D6467)..................................................................................................................................442 Rock Correction (ASTM D4718)...................................................................................................................................26 R-Value (Cal 301, ASTM D2844)...............................................................................................................................276 Sandcastle Test (USACE)..........................................................................................................................................195 Sand Equivalent (Cal 217, ASTM D2419)....................................................................................................................88 Sieve Analysis (ASTM C136, ASTM D6913, Cal 202) ...............................................................................................110 Sieve Analysis with Hydrometer (Cal 203, ASTM D422)............................................................................................200 Soil Cement Compression Strength (Cal 312, ASTM D1633)......................................................................................50 Soil Cement Cylinder Fabrication (Cal 312, ASTM D1632)........................................................................................100 Soluble Chlorides (Cal 422) .........................................................................................................................................62 Soluble Sulfate (Cal 417) .............................................................................................................................................62 Soundness 5 Cycles (Cal 214, ASTM C88) ...............................................................................................................375 Specific Gravity Coarse Aggregate (Cal 206, ASTM C127).......................................................................................115 Specific Gravity Fine Aggregate (Cal 207, ASTM C128)............................................................................................115 Triaxial Shear Consolidated - Undrained (ASTM D4767).......................................................................................Quote Triaxial Shear Unconsolidated - Undrained (ASTM D2850)...................................................................................Quote Triaxial Staged Consolidated - Undrained (ASTM D4767).....................................................................................Quote Triaxial Staged Unconsolidated - Undrained (ASTM D2850) .................................................................................Quote Unconfined Compression (ASTM D2166)..................................................................................................................162 Unit Weight Aggregate (Cal 212, ASTM C29)..............................................................................................................80

Page 335 ends

Item 29.

ATLAS SCHEDULE OF FEES Page 3 of 4
Revised February 1, 2021
Asphalt Concrete
Asphalt Core Specific Gravity (Cal 308, ASTM D2726) .............................................................................................$68 Asphalt Core Specific Gravity Waxed (Cal 308, ASTM D1188) ...................................................................................84 Emulsion Content (CTM 382).....................................................................................................................................178 Film Stripping (Cal 302) .........................................................................................................................................Quote Gyratory Compacted Maximum Specific Gravity (AASHTO T312).............................................................................350 Hamburg Wheel Plant Produced HMA (AASHTO T324/Caltrans Section 39) ...........................................................900 Hveem Maximum Bulk Specific Gravity (Cal 308)......................................................................................................300 Hveem & Stabilometer Value (Cal 366) ...................................................................................................................$400 Ignition Oven Correction Factor (AASHTO T308) ......................................................................................................250 Ignition Oven Degradation Factor (AASHTO T308) ...................................................................................................250 Marshall Density Stability & Flow (ASTM D6927) ......................................................................................................400 Marshall Density (ASTM D6926)................................................................................................................................300 Moisture Content of Asphalt Mixtures Using Microwave (Cal 370)...............................................................................50 Moisture Vapor Susceptibility (Cal 307) .................................................................................................................Quote Optimum Bitumen Content (AASHTO R35/Cal 367) ..............................................................................................3,100 Percent Bitumen Asphaltic Concrete (Cal 382, ASTM D6307) ..................................................................................180 Residue by Evaporation (Cal 331) .............................................................................................................................178 Rice Maximum Theoretical Specific Gravity AC (Cal 309, ASTM D2041)..................................................................133 Sieve Analysis Extracted Aggregate (Cal 382, ASTM D5444).....................................................................................90 Stability and Flow (ASTM D1559) ..............................................................................................................................350 Stabilometer Value (Cal 366) .....................................................................................................................................350 RAP Testing Fractionated (ASTM D2172, AASHTO T308, Caltrans Section 39) ..................................................Quote RAP Testing Not Fractionated (ASTM D2172, AASHTO T308, Caltrans Section 39) .......................................... Quote Tensile Strength Ratio Plant Produced HMA (AASHTO T283)..................................................................................900 Wet Track Abrasion (ASTM D3910)...........................................................................................................................185 Concrete
2X2 Cube Compression ............................................................................................................................................$27 Chloride Ion Testing (ASTM C1218) ..........................................................................................................................220 Concrete Core Compression (ASTM C42)...................................................................................................................59 Concrete Cylinder Compression (Cal 521, ASTM C39) ...............................................................................................27 Flex Beam Modulus of Rupture (Cal 523, ASTM C78)................................................................................................. 74 Modulus of Elasticity (Cal 522, ASTM C469) .............................................................................................................261 Shotcrete Mockup Panel (ASTM C1140) ...............................................................................................................1,040 Shotcrete Panel, 3 Cores Compression (CBC)..........................................................................................................290 Shrinkage Hardened Concrete (ASTM C157 Modified) .............................................................................................371 Split Tensile Concrete Cylinder (ASTM C496) .............................................................................................................74 Time of Set (ASTM C403)..........................................................................................................................................200 Trial Batch Fabrication (ASTM C192) ........................................................................................................................298 Unit Weight Hardened Concrete (ASTM C642)............................................................................................................55 Unit Weight Lightweight Concrete (ASTM C567) .........................................................................................................69 Masonry
Absorption Block (ASTM C140) ..............................................................................................................................$115 Compression Adobe...................................................................................................................................................155 Compression Block Standard (ASTM C140)..............................................................................................................150 Compression Brick (ASTM C67) ................................................................................................................................115 Efflorescence Block....................................................................................................................................................175 Efflorescence Brick (ASTM C67)................................................................................................................................175 Grout Prism Compression (ASTM C1019)...................................................................................................................27 Masonry Core Compression (ASTM C42)....................................................................................................................51 Masonry Core Shear (CBC 2105A.4)...........................................................................................................................95 Masonry Prism Compression (ASTM E447) ..............................................................................................................150 Mortar Bond Strength Pull Test (ASTM C482).............................................................................................................62 Mortar Cylinder Compression.......................................................................................................................................27 Mortar Shear Strength (ANSI 118).............................................................................................................................100 Relative Mortar Strength (Cal 515) ............................................................................................................................850 Shrinkage Masonry Block (ASTM C426)....................................................................................................................250 Trial Grout Prisms (ASTM C942) ................................................................................................................................. 38 Water Retention and Air Content (ASTM C270).........................................................................................................550

Page 336 ends

Item 29.

ATLAS SCHEDULE OF FEES Page 4 of 4
Revised February 1, 2021
Metal
Bolt Assembly Hardness Test ...................................................................................................................................$74 Bolt Assembly Tensile & Proof Load Test ..................................................................................................................125 Modulus of Elasticity (Steel).......................................................................................................................................146 Post-Tension Tendon Tensile Testing........................................................................................................................185 Tensile Strength & Bend Test Structural Steel (ASTM A370) ....................................................................................180 Tensile Strength & Bend Test Reinforcing Steel (ASTM A615/A706) ........................................................................125 Tensile Strength #14 - #18 Bar (ASTM A615)........................................................................................................Quote Tensile Strength Mechanical Splices #9 and Smaller (Cal 670).............................................................................Quote Tensile Strength Mechanical Splices #10 to #14 (Cal 670)....................................................................................Quote Tensile Strength Mechanical Splices #18 (Cal 670) ............................................................................................. Quote Miscellaneous
Fire Proofing Density Test (ASTM E605) ..................................................................................................................$69 Fiber Reinforced Polymer Tensile (ASTM D3039) .....................................................................................................520 Material Preparation ....................................................................................................................................................70 Relative Humidity Test (ASTM F2170) .................................................................................................................. 80/kit Concrete Vapor Emission Kits (ASTM F1869) ...................................................................................................... 72/kit Miscellaneous Charges .......................................................................................................................................Various Default Expense ..................................................................................................................................................Various

TERMS AND CONDITIONS
Prevailing wage rates will increase consistent with general prevailing wage determinations made by the California Department of Industrial Relations.

All field services will be charged portal to portal with the following minimum charges:

1. The client will be invoiced only for the hours actually worked in 4- and 8-hour increments.

2. A 2-hour show-up charge will be applied to any service canceled the same day of service.

3. Work in excess of 8 hours up to 12 hours in a single day will be charged in 1-hour increments at 1.5 times the standard rate.

4. Work in excess of 12 hours in a single day will be charged in 1-hour increments at 2 times the standard rate.

Work performed by field or laboratory personnel outside of normal business hours (6:30 a.m. to 5:00 p.m.) will be charged a premium on a case-by-case basis. Work performed for Geophysical Studies outside of a standard work week will be charged an additional 30%.

Fees for specialty geophysical services such as seismic reflection, crosshole, gravity, pile integrity testing, vibration monitoring, magnetotellurics, UXO, MEC, etc. will based on a per project basis. Utility focused projects requiring specialized training such as MSHA (mines) or RSO (refineries) will be billed at a General Geophysical rate.

Other Direct Charges: Our company reserves the right to charge for services outside of the contract in the form of reimbursables, including but not limited to, the following: diamond coring bits, fuel, patching materials, mileage, travel time, equipment rental and administrative time.

Mileage will be charged at the standard federal rate per mile for distances over 50 miles from the location of dispatch.

Per Diem charges will be applied to projects outside a 50-mile radius of our office.

Subcontracted services will be charged at cost plus 20 percent.

Invoices will be submitted monthly. These invoices are due in full upon presentation to the client. Invoices outstanding over 30 days will be considered past due. A finance charge computed at the rate of 1.5 percent per month, which is an annual rate of 18 percent, will be charged on all past due accounts. If legal action is brought on delinquent accounts, the prevailing party shall be entitled to recover its reasonable attorney’s fees and other costs of collection.

Our services are performed in accordance with the current standards of practice in the industry. No other warranty or representation, express or implied, is made or intended.

Page 337 ends

Item 29.
(rev_6/1/20)
Schedule B
SCHEDULE OF FEES California Prevailing Wage
Effective July 1, 2019

PROFESSIONAL SERVICES
Professional (Engineering, Geology, Environmental)
Principal Professional .......................................................................................................................................................................... $180 Senior Professional ............................................................................................................................................................................... 160 Project Professional............................................................................................................................................................................... 140 Staff Professional .................................................................................................................................................................................. 115 Drafter ..................................................................................................................................................................................................... 87 Field Services (Geotechnical, Inspection)
Field Supervisor...................................................................................................................................................................................$115 LA Certified Grading Inspector .............................................................................................................................................................. 120 Off Site Inspector.....................................................................................................................................................................................65 Laboratory Technician .............................................................................................................................................................................72 Group 1 (Geotechnical, Concrete Sampling)......................................................................................................................................... 106 Group 2 (Special Inspection) ................................................................................................................................................................. 110 Group 3 (NDT Testing) .......................................................................................................................................................................... 114 Coring.................................................................................................................................................................................................... 162 Field Services (Utility/Rebar Locating)
Hourly Rate (A Mob/Demob charge of $300 applies to projects billed onhourly rates) ....................................................................... $215 Full Day .............................................................................................................................................................................................. 1,950 Letter Report ......................................................................................................................................................................................... 300 Map (per day of field work) .................................................................................................................................................................... 350 Field Services (Geophysical Studies: UST, Landfill, Well, Void, UXO, Groundwater) Ground Penetrating Radar, Electromagnetics, Magnetics
Full Day ............................................................................................................................................................................................ $2,350 Hourly Rate (A Mob/Demob charge of $325 applies to projects billed on hourly rates.)........................................................................ 265 Seismic (Refraction, MASW, Downhole/Crosshole), Resistivity (Sting, Standard, Wenner 4-Pin) Full Day ............................................................................................................................................................................................ $3,000 Hourly Rate (A Mob/Demob charge of $550 applies to projects billed on hourly rates.)........................................................................ 325 Seismic ReMi
One Line........................................................................................................................................................................................... $1,500 Each Additional Line.............................................................................................................................................................................. 300 For Pavement/Requires Drilling............................................................................................................................................................. 300 Project Management
Senior Project Manager....................................................................................................................................................................... $158 Project Manager .................................................................................................................................................................................... 130 Administrative Assistant .......................................................................................................................................................................... 67 Travel and Miscellaneous
Pick Up ..............................................................................................................................................................................................$55/hr Travel Time .................................................................. Hourly Rate (or $125/hr beyond 2 hours from San Diego for GeophysicalCrews) Per Diem (variable, depending on location)....................................................................................................................................... Quote Prevailing Wage Hourly Surcharge for Technicians and Inspectors per California Labor Code §720,et. Seq................................... Quote Overtime and Saturday Rate ..............................................................................................................................1.5 x Regular Hourly Rate Sunday and Nationally Recognized Holiday Rate (including the day after Thanksgiving)......................................2 x Regular Hourly Rate Rush Surcharge....................................................................................................................................................... Normal Rate plus 50% Specialty Equipment Surcharge ........................................................................................................................................................ Quote

Page 338 ends

Item 29.
(rev_6/1/20)

SCHEDULE OF FEES CONTINUED

LABORATORY TESTS
Soil and Aggregate
California Bearing Ratio (ASTM D854)................................................................................................................................................ $418 California Impact (Cal 216).................................................................................................................................................................... 206 Chloride Ion Testing (Cal 422)............................................................................................................................................................... 150 Clay Lumps in Aggregate (ASTM C142) ............................................................................................................................................... 150 Cleanness Value (Cal 227).................................................................................................................................................................... 200 Consolidation (ASTM D2435)................................................................................................................................................................ 200 Corrosivity Testing (Soluble Chlorides and Sulfates, pH and Resistivity) .............................................................................................. 187 Crushed Particles (Cal 205, ASTM D693) ............................................................................................................................................. 150 Direct Shear (ASTM D3080).................................................................................................................................................................. 260 Durability Factor (Cal 229, ASTM D3744) ............................................................................................................................................... 97 Durability Index (Cal 229, ASTM D3744)............................................................................................................................................... 224 Expansion Index (ASTM D4289) ........................................................................................................................................................... 177 Fine Aggregate Angularity (AASHTO T304).......................................................................................................................................... 200 Fineness Modulus (ASTM C136)............................................................................................................................................................. 24 Flat & Elongated Pieces (ASTM D4791)................................................................................................................................................ 175 Light Weight Pieces (ASTM C123)........................................................................................................................................................ 175 Liquid Limit (Cal 204, ASTM D4318) ....................................................................................................................................................... 75 Los Angeles Abrasion - 1 1/2” and smaller (Cal 211, ASTM C131)....................................................................................................... 224 Maximum Density Check Point (ASTM D698/D1557) ............................................................................................................................. 88 Maximum Density/Optimum Moisture – 4” (ASTM D698, D1557) ......................................................................................................... 200 Maximum Density/Optimum Moisture – 6” (ASTM D698, D1557) ......................................................................................................... 220 Minimum Density (ASTM D1556)............................................................................................................................................................ 74 Moisture Content (Cal 226, ASTM C566, ASTM D2216)......................................................................................................................... 35 Natural Density - Chunk Sample (ASTM D2937)..................................................................................................................................... 41 Natural Moisture/Density Ring or Core Sample (ASTM D2937) .............................................................................................................. 35 Organic Impurities (Cal 213, ASTM C40) ................................................................................................................................................ 90 Organic Matter (ASTM D2974)................................................................................................................................................................ 75 Percent Finer than #200 (ASTM C117, ASTM D1140)............................................................................................................................ 70 Permeability Remold Sample (ASTM D2434) ....................................................................................................................................... 200 Permeability Remold Sample (ASTM D5084) ....................................................................................................................................Quote Permeability Undisturbed Sample (ASTM D5084)..............................................................................................................................Quote Petrographic Analysis (Cal 215, ASTM C295)................................................................................................................................... Quote pH & Resistivity (Cal 643, ASTM G51).................................................................................................................................................. 126 Plasticity Index (Cal 204, ASTM 4318) .................................................................................................................................................. 127 Potential Reactivity (ASTM C289) ......................................................................................................................................................... 220 Residual Shear (ASTM D6467) ............................................................................................................................................................. 442 Rock Correction (ASTM D4718).............................................................................................................................................................. 26 R-Value (Cal 301, ASTM D2844) .......................................................................................................................................................... 276 Sand Castle Test (USACE) ................................................................................................................................................................... 195 Sand Equivalent (Cal 217, ASTM D2419) ............................................................................................................................................... 88 Sieve Analysis (ASTM C136, ASTM D6913, Cal 202)........................................................................................................................... 110 Sieve Analysis with Hydrometer (Cal 203, ASTM D422) ....................................................................................................................... 200 Soil Cement Compression Strength (Cal 312, ASTM D1633) ................................................................................................................. 50 Soil Cement Cylinder Fabrication (Cal 312, ASTM D1632) ................................................................................................................... 100 Soluble Chlorides (Cal 422)..................................................................................................................................................................... 62 Soluble Sulfate (Cal 417)......................................................................................................................................................................... 62 Soundness 5 Cycles (Cal 214, ASTM C88)........................................................................................................................................... 375 Specific Gravity Coarse Aggregate (Cal 206, ASTM C127)................................................................................................................... 115 Specific Gravity Fine Aggregate (Cal 207, ASTM C128) ....................................................................................................................... 115 Triaxial Shear Consolidated - Undrained (ASTM D4767) .................................................................................................................. Quote Triaxial Shear Unconsolidated - Undrained (ASTM D2850) .............................................................................................................. Quote Triaxial Staged Consolidated - Undrained (ASTM D4767) ................................................................................................................ Quote Triaxial Staged Unconsolidated - Undrained (ASTM D2850)............................................................................................................. Quote Unconfined Compression (ASTM D2166) ............................................................................................................................................. 162 Unit Weight Aggregate (Cal 212, ASTM C29) ......................................................................................................................................... 80

Page 339 ends

Item 29.
(rev_6/1/20)

SCHEDULE OF FEES CONTINUED
Asphalt Concrete
Asphalt Core Specific Gravity (Cal 308, ASTM D2726 .......................................................................................................................... $58 Asphalt Core Specific Gravity Waxed (Cal 308, ASTM D1188)............................................................................................................... 74 Emulsion Content (CTM 382)................................................................................................................................................................ 178 Film Stripping (Cal 302)..................................................................................................................................................................... Quote Gyratory Compacted Maximum Specific Gravity (AASHTO T312)........................................................................................................ 350 Hamburg Wheel - Plant Produced HMA (AASHTO T324/Cal-Trans Section 39) .................................................................................. 900 Hveem - Maximum Bulk Specific Gravity (Cal 308)............................................................................................................................... 300 Hveem & Stabilometer Value (Cal 366)................................................................................................................................................. 400 Ignition Oven Correction Factor (AASHTO T308) ................................................................................................................................. 250 Ignition Oven Degradation Factor (AASHTO T308) .............................................................................................................................. 250 Marshall Density, Stability & Flow (ASTM D6927)................................................................................................................................. 400 Marshall Density (ASTM D6926)........................................................................................................................................................... 300 Moisture Content of Asphalt Mixtures Using Microwave (Cal 370).......................................................................................................... 50 Moisture Vapor Susceptibility (Cal 307)............................................................................................................................................. Quote Optimum Bitumen Content (AASHTO R35/Cal 367) .......................................................................................................................... 3,100 Percent Bitumen Asphaltic Concrete (Cal 382, ASTM D6307).............................................................................................................. 180 Residue by Evaporation (Cal 331)......................................................................................................................................................... 178 Rice - Maximum Theoretical Specific Gravity AC (Cal 309, ASTM D2041)........................................................................................... 133 Sieve Analysis - Extracted Aggregate (Cal 382, ASTM D5444) .............................................................................................................. 90 Stability and Flow (ASTM D1559) ......................................................................................................................................................... 350 Stabilometer Value (Cal 366) ................................................................................................................................................................ 350 RAP Testing - Fractionated (ASTM D2172/AASHTO T308/Cal-TransSection 39............................................................................. Quote RAP Testing - Not Fractionated (ASTM D2172/AASHTO T308/Cal-Trans Section 39)..................................................................... Quote Tensile Strength Ratio - Plant Produced HMA (AASHTO T283) ........................................................................................................... 900 Wet Track Abrasion (ASTM D3910)...................................................................................................................................................... 185 Concrete
2X2 Cube Compression ........................................................................................................................................................................ $27 Concrete Core Compression (ASTM C42).............................................................................................................................................. 59 Concrete Cylinder Compression (Cal 521, ASTM C39) .......................................................................................................................... 27 Flex Beam Modulus of Rupture (Cal 523, ASTM C78) ............................................................................................................................ 74 Modulus of Elasticity (Cal 522, ASTM C469)......................................................................................................................................... 261 Shotcrete Mockup Panel (ASTM C1140)............................................................................................................................................ 1,040 Shotcrete Panel, 3 Cores - Compression (CBC) ................................................................................................................................... 290 Shrinkage - Hardened Concrete (ASTM C157 - Modified) .................................................................................................................... 371 Split Tensile, Concrete Cylinder (ASTM C496) ....................................................................................................................................... 74 Time of Set (ASTM C403) ..................................................................................................................................................................... 200 Trial Batch Fabrication (ASTM C192).................................................................................................................................................... 298 Unit Weight, Hardened Concrete (ASTM C642)...................................................................................................................................... 45 Unit Weight, Lightweight Concrete (ASTM C567) ................................................................................................................................... 59 Masonry
Absorption Block (ASTM C140)........................................................................................................................................................... $115 Compression Adobe.............................................................................................................................................................................. 155 Compression Block, Standard (ASTM C140) ........................................................................................................................................ 150 Compression, Brick (ASTM C67) .......................................................................................................................................................... 115 Efflorescence Block............................................................................................................................................................................... 175 Efflorescence, Brick (ASTM C67).......................................................................................................................................................... 175 Grout Prism Compression (ASTM C1019) .............................................................................................................................................. 27 Masonry Core Compression (ASTM C42)............................................................................................................................................... 51 Masonry Core Shear (CBC 2105A.4)...................................................................................................................................................... 95 Masonry Prism Compression (ASTM E447).......................................................................................................................................... 150 Mortar Bond Strength - Pull Test (ASTM C482) ...................................................................................................................................... 62 Mortar Cylinder Compression.................................................................................................................................................................. 27 Mortar Shear Strength (ANSI 118) .......................................................................................................................................................... 53

Page 340 ends

Item 29.
(rev_6/1/20)

SCHEDULE OF FEES CONTINUED

TERMS AND CONDITIONS
Masonry - Continued
Relative Mortar Strength (Cal 515)...................................................................................................................................................... $850 Shrinkage - Masonry Block (ASTM C426)............................................................................................................................................. 250 Trial Grout Prisms (ASTM C942)............................................................................................................................................................. 38 Water Retention and Air Content (ASTM C270).................................................................................................................................... 470 Metal
Bolt Assembly - Hardness Test ............................................................................................................................................................. $74 Bolt Assembly - Tensile & Proof Load Test ........................................................................................................................................... 125 Modulus of Elasticity (Steel) .................................................................................................................................................................. 146 Post-Tension Tendon Tensile Testing................................................................................................................................................... 185 Tensile Strength & Bend Test, Reinforcing Steel (ASTM A615/A706)................................................................................................... 125 Tensile Strength #14 - #18 Bar (ASTM A615) ................................................................................................................................... Quote Tensile Strength - Mechanical Splices #9 and Smaller (Cal 670) ...................................................................................................... Quote Tensile Strength - Mechanical Splices #10 to #14 (Cal 670) ............................................................................................................. Quote Tensile Strength - Mechanical Splices #18 (Cal 670) ........................................................................................................................ Quote Tensile Strength and Bend Test, Structural Steel (ASTM A370)........................................................................................................... 180 Miscellaneous
Fire Proofing Density Test (ASTM E605) .............................................................................................................................................. $69 Fiber Reinforced Polymer, Tensile (ASTM D3039) ............................................................................................................................... 520 Material Preparation ............................................................................................................................................................................70/hr Relative Humidity Test (ASTM F2170) ................................................................................................................................................80/kit Concrete Vapor Emission Kits (ASTM F1869).....................................................................................................................................72/kit Test Chamber and Water Spray Rack (ASTM E1105) .................................................................................................................. 275/hour Miscellaneous Charges ...................................................................................................................................................................Various Default Expense ..............................................................................................................................................................................Various All field services will be charged portal to portal with the following minimum charges:
• A two-hour show-up charge will be applied to any service canceled the same day of service. • The client will be invoiced only for the hours actually worked in 4 and 8 hour increments. • Work in excess of eight hours up to twelve hours in a single day, will be charged in one-hour increments at 1.5 times the standard rate. • Work in excess of twelve hours in a day will be charged in one-hour increments at 2.0 times the standard rate.

Work performed by field or laboratory personnel outside of normal business hours (6:30 AM – 5:00 PM) will be charged a premium on a case-by-case basis.

Reimbursables: Our company reserves the right to charge for services outside of the contract in the form of reimbursables. These items include, but are not limited to, the following consumables: diamond coring bits, fuel, patching materials, mileage, travel time, equipment rental and administrative time.

Subcontracted services that are included on the Fee Schedule will be charged at those rates. Subcontracted services not included in our Fee Schedule will be charged at cost plus 20 percent. Per Diem charges will be applied to projects outside a 50-mile radius of our office. Mileage will be charged at the rate of 54.4 cents per mile for distances over 50 miles from the location of dispatch.

Invoices for all services completed or in progress will be submitted monthly. These invoices are due in full upon presentation to the client. Invoices outstanding over 30 days will be considered past due. A finance charge will be computed at the rate of 1.5 percent per month, which is an annual rate of 18 percent and charged on all past due accounts. If legal action is brought on delinquent accounts, the prevailing party shall be entitled to recover its reasonable attorney’s fees and other costs of collection.

Our professional engineering, geology, and inspection services are performed in accordance with the current standards of practice in the industry. No other warranty or representation, express or implied, is made or intended.

Prevailing wage rates will increase consistent with general prevailing wage determinations made by the California Department of Industrial Relations.

Page 341 ends

Item 29.

B-1
80237.00000\19870870.1
EXHIBIT “B”

SCHEDULE OF SERVICES
October 12, 2022 through October 12, 2023.

Page 342 ends

Item 29.

C-1
80237.00000\19870870.1
EXHIBIT “C”

COMPENSATION
Not to Exceed $25,000.00.

Page 343 ends

Item 29.

STAFF REPORT
10/12/2022
TO: Honorable Mayor and City Council Members
FROM: Celina Jimenez, Grants Manager
SUBJECT: Approve an Art in Public Places Proposal for a City of Coachella Art Mural at Acrisure Arena in the Amount of $10,000
STAFF RECOMMENDATION:

Staff recommends that the City Council considers approving and awarding a grant to Flat Black Art Supply in the amount of $10,000 from the City of Coachella’s Art in Public Places Program to install a mural at Acrisure Arena as part of the Nine Desert Cities wall art initiative that will be displayed on the Iceplex for each city. The City of Coachella Cultural and Arts Commission reviewed and approved this item for Council’s final approval at its meeting held on September 27, 2022.

BACKGROUND:

On January 1, 2011, the City Council approved Ordinance No. 1034 establishing an Art in Public Places Program and implementing a new development impact fee for certain new construction, remodeling and reconstruction of public art installations. The purpose of the Art in Public Places ordinance is to develop and maintain a visual arts program for the residents and visitors of Coachella, to add to the economic vitality of the community, and to enhance the environment and unique character of Coachella by providing for the acquisition and maintenance of quality works of public art.

DISCUSSION/ANALYSIS:

The submitted proposal is a painted mural project as part of the #TheDesertNine art initiative at Acrisure Arena where all nine desert cities will each have a mural representing their city. The mural size will be 10-foot wide by 20-foot in height.

Page 344 ends

Item 30.

Wall Display Area at Acrisure Arena
Proposed Mural Rendering
Artist: Frank Lemus

Page 345 ends

Item 30.

Funding Request: $10,000
Sponsorship (paid to Flat Black Art Supply) includes:
 Curation and creation of all artwork
 Installation and insurance requirements (provided by Flat Black Art Supply)  Artist recognition plaques and large format signage highlighting the collection and each desert city produced by Acrisure Arena
 1,000 oversized postcards representing each mural produced by Acrisure Arena  Invitations for up to 10 guests to attend #TheDesertNine Reveal party (produced by Acrisure Arena)
 Acrisure Arena Website highlight, minimum one post and story via social channels @AcrisureArena, and feature in Arena e-newsletter
 Inclusion in Arena opening PR campaign, distributed nationally.

ALTERNATIVES:

1. Not Approve an Art in Public Places Proposal for a City of Coachella Mural at Acrisure Arena in the Amount of $10,000

2. Not Approve
FISCAL IMPACT:

If the City Council approves the staff recommendation, the funds in the amount of $10,000 will be withdrawn from the Special Revenue Funds (130) – Development Impact Fees for Public Art for Fiscal Year 2022-23.

Page 346 ends

Item 30.
#TheDesertNine
Proposal

Page 347 ends

Item 30.
#TheDesertNine
In partnership with nine desert cities, and local mural curator, Flat Black Art Supply, create nine murals in the Arena Iceplex by local artists that celebrate Coachella Valley. Showcased along the massive Iceplex walls, each mural will be 10’w x 20’h.

Premium
Level: Iceplex

Page 348 ends

Item 30.
3 #TheDesertNine
Bold colors, iconic settings and whimsical interpretations of desert landscapes will serve as the perfect Instagrammable background highlighting the unique qualities of each city. Both City and artist social handles will be featured, and each mural will feature a connective graphic thread.

Page 349 ends

Item 30.
4 #TheDesertNine
Nearly 1M guests take part
#TheDesertNine
With over 200k guests* frequenting the Iceplex annually, the murals* can be seen from multiple levels, and will take visitors and locals on a visual journey across our Valley.

Acrisure Arena will provide the overarching theme for the murals which will celebrate unity and diversity of our remarkable landscape and culture. Cities will collaborate with Flat Black Art Supply and Acrisure Arena to select artists for the project and Acrisure Arena will approve final artwork.

The murals will be featured at the Arena for a minimum of three years.

Page 350 ends

Item 30.

City Sponsorship: $10,000
Sponsorship (paid to Flat Black Art Supply) includes:
• Curation and creation of all artwork
• Installation and insurance requirements (provided by Flat Black Art Supply) • Artist recognition plaques and large format signage highlighting the collection and each desert city produced by Acrisure Arena • 1,000 oversized postcards representing each mural produced by Acrisure Arena • Invitations for up to 10 guests to attend #TheDesertNine Reveal party (produced by Acrisure Arena) • Acrisure Arena Website highlight, minimum one post and story via social channels @AcrisureArena, and feature in Arena enewsletter • Inclusion in Arena opening PR campaign, distributed nationally. 5

Page 351 ends

Item 30.

August 15 - 26
• Artists selected and approved by each city, with support from Flat Black Art Supply and Acrisure Arena
August 29 – September 16
• Conceptual mural designs submitted to Flat Black Art Supply.

September 19 – October 1
• Flat Black Art Supply submits mural concepts to each City and Acrisure Arena for review/approval.
6 October 3 – October 17
• Mural concepts approved
November 1 – 30
• Mural painting
December 1 – 9
• Plaque/signage installation, touch-ups
January 4
• Opening Celebration and Mural Unveiling
Timeline

Page 352 ends

Item 30.

STAFF REPORT
10/12/2022
TO: Honorable Mayor and City Council Members
FROM: Celina Jimenez, Grants Manager
SUBJECT: Approve an Art in Public Places Proposal for a City of Coachella 75th Anniversary Mural by Michelle Guerrero in the Amount of $16,000 STAFF RECOMMENDATION:

Staff recommends that the City Council consider approving and awarding a grant to Michelle Guerrero in the amount of $16,000 from the City of Coachella’s Art in Public Places Program to install a mural on the Anaya’s Towing building on the corner of Fifth Street and Grapefruit Boulevard. The Cultural and Arts Commission reviewed and approved this item for Council’s final approval at its meeting held on September 27, 2022.

BACKGROUND:

On January 1, 2011, the City Council approved Ordinance No. 1034 establishing an Art in Public Places Program and implementing a new development impact fee for certain new construction, remodeling and reconstruction of public art installations. The purpose of the Art in Public Places ordinance is to develop and maintain a visual arts program for the residents and visitors of Coachella, to add to the economic vitality of the community, and to enhance the environment and unique character of Coachella by providing for the acquisition and maintenance of quality works of public art.

DISCUSSION/ANALYSIS:

The submitted proposal is a painted mural project approximately 40 feet in length celebrating the City of Coachella’s 75th anniversary featuring MrBBaby’s (Michelle Guerrero) signature character “Chucho”, who is a colorful furry piñata. The brief history of the piñata is that they originated in China when paper figures were filled with seeds and broken as a way to bring good luck for the coming harvest season. In Mexico, the Aztecs honored the birthday of the solar god Huitzilopochtli in mid-December by decorating a pot with feathers to represent the god. In the ritual, the pot was broken and the fruits of the season and other edibles were shared. Life was meant to grow out of destruction—this message has been a driving force behind MrBBaby’s work and has defined Chucho, who is a symbol of hope, resilience and mental health awareness as Chucho is always looking at the brighter side of things, especially the negative ones.

Page 353 ends

Item 31.

Budget
Installation Costs – Labor $9,000
Installation Costs – Equipment Rental $1,500
Other Costs – Materials $3,000
Insurance $200
Miscellaneous Costs $2,300
TOTAL $16,000
About the Artist
Michelle Guerrero (also known as, “MrBBaby” for Michelle Ruby Brown Baby) was born and raised in San Diego, California. She uses elements of her heritage as an inspiration for her striking and lively art work. MrBbaby is heavily influenced by her community, as well as her Puerto Rican/Mexican heritage. By combining vibrant colors with traditional imagery, Michelle is able to uplift her audiences and intrigue her viewers. The artist aims to bring happiness and joy to her collectors and community, while also having stronger messages intertwined, all of which are open to the viewer's interpretation. Michelle holds a Bachelor’s Degree in Fine Arts from the Academy of Art University – San Francisco, CA. Her art murals have been commissioned by the following acclaimed companies:
 Coachella Music and Arts Festival
 Dodger Stadium
 Sony Electronics
 Cheetos
 The Getty
 El Pollo Loco
 City of Chula Vista
 San Diego Jewish Center
 Los Angeles Art District
 Random House (book illustration for “Crux” by Jean Guerrero)  Women on Walls (Puebla, Mexico)
 Pandora Jewelry
 Converse Shoes
 UPS and Kids of Immigrants
 Displayed Work at Galleries: Chicano Park, Chimmaya Gallery, Just Another Gallery

Page 354 ends

Item 31.

Proposed Mural Design Rendition
75th Anniversary Mural
Artist: Michelle Ruby Guerrero

Page 355 ends

Item 31.

ALTERNATIVES:

1. Not Approve An Art in Public Places Proposal for a City of Coachella 75th Anniversary Mural by Michelle Guerrero in the Amount of $16,000

2. Provide Alternative Direction
FISCAL IMPACT:

If the City Council approves the staff recommendation, the $16,000 will be withdrawn from the Special Revenue Funds (130) – Development Impact Fees for Public Art for Fiscal Year 2022-

23.

Page 356 ends

Item 31.

STAFF REPORT
10/12/2022
TO: Honorable Mayor and City Council Members
FROM: Celina Jimenez, Grants Manager
SUBJECT: Approve an Art in Public Places Proposal for a City of Coachella 75th Anniversary Mural on the U.S. Postal Service Building by Michelle Guerrero in the Amount of $15,000
STAFF RECOMMENDATION:

Staff recommends that the Cultural and Arts Commission consider approving and awarding a grant to Michelle Guerrero in the amount of $15,000 from the City of Coachella’s Art in Public Places Program to install a mural on the U.S. Postal Service building on the corner of Sixth Street and Orchard Street. The Cultural and Arts Commission reviewed and approved this item for Council’s final approval at its meeting held on September 27, 2022.

BACKGROUND:

On January 1, 2011, the City Council approved Ordinance No. 1034 establishing an Art in Public Places Program and implementing a new development impact fee for certain new construction, remodeling and reconstruction of public art installations. The purpose of the Art in Public Places ordinance is to develop and maintain a visual arts program for the residents and visitors of Coachella, to add to the economic vitality of the community, and to enhance the environment and unique character of Coachella by providing for the acquisition and maintenance of quality works of public art.

DISCUSSION/ANALYSIS:

The submitted proposal is a painted mural project approximately 40 feet in length celebrating the City of Coachella’s 75th anniversary featuring MrBBaby’s (also known as, “MrBBaby” for Michelle Ruby Brown Baby) signature character “Chucho”, who is a colorful furry piñata. The brief history of the piñata is that they originated in China when paper figures were filled with seeds and broken as a way to bring good luck for the coming harvest season. In Mexico, the Aztecs honored the birthday of the solar god Huitzilopochtli in mid-December by decorating a pot with feathers to represent the god. In the ritual, the pot was broken and the fruits of the season and other edibles were shared. Life was meant to grow out of destruction—this message has been a driving force behind MrBBaby’s work and has defined Chucho, who is a symbol of hope, resilience and mental health awareness as Chucho is always looking at the brighter side of things, especially the negative ones.

Page 357 ends

Item 32.

Budget
Installation Costs – Labor $9,000
Installation Costs – Equipment Rental $500
Other Costs – Materials $3,000
Miscellaneous Costs $2,500
TOTAL $15,000
About the Artist
Michelle Guerrero (also known as, “MrBBaby” for Michelle Ruby Brown Baby) was born and raised in San Diego, California. She uses elements of her heritage as an inspiration for her striking and lively art work. MrBbaby is heavily influenced by her community, as well as her Puerto Rican/Mexican heritage. By combining vibrant colors with traditional imagery, Michelle is able to uplift her audiences and intrigue her viewers. The artist aims to bring happiness and joy to her collectors and community, while also having stronger messages intertwined, all of which are open to the viewer's interpretation. Michelle holds a Bachelor’s Degree in Fine Arts from the Academy of Art University – San Francisco, CA. Her art murals have been commissioned by the following acclaimed companies:
 Coachella Music and Arts Festival
 Dodger Stadium
 Sony Electronics
 Cheetos
 The Getty
 El Pollo Loco
 City of Chula Vista
 San Diego Jewish Center
 Los Angeles Art District
 Random House (book illustration for “Crux” by Jean Guerrero)  Women on Walls (Puebla, Mexico)
 Pandora Jewelry
 Converse Shoes
 UPS and Kids of Immigrants
 Displayed Work at Galleries: Chicano Park, Chimmaya Gallery, Just Another Gallery

Page 358 ends

Item 32.

Proposed Mural Design Rendition
75th Anniversary Mural at U.S. Postal Service Building
Artist: Michelle Ruby Guerrero

Page 359 ends

Item 32.

ALTERNATIVES:

1. Not Approve an Art in Public Places Proposal for a City of Coachella 75th Anniversary Mural on the U.S. Postal Service Building by Michelle Guerrero in the Amount of $15,000

2. Provide Alternative Direction
FISCAL IMPACT:

If the City Council approves the staff recommendation, the $15,000 will be withdrawn from the Special Revenue Funds (130) – Development Impact Fees for Public Art for Fiscal Year 2022-

23.

Page 360 ends

Item 32.

STAFF REPORT
10/12/2022
TO: Honorable Mayor and City Council Members
FROM: Celina Jimenez, Grants Manager
SUBJECT: Approve an Art in Public Places Program Proposal to Restore the Shady Lane Murals by Culturas Music and Arts in the Amount of $13,000 STAFF RECOMMENDATION:

Staff recommends that City Council approve the Cultural and Arts Commission recommendation awarding a sponsorship grant to Culturas Music and Arts in the amount of $13,000 from the City of Coachella’s Art in Public Places Program to restore the art mural walls along Shady Lane between Bagdad Street and Avenue 52. This item was previously approved by the Cultural and Arts Commission at its meeting held on September 21, 2021 with the condition that Culturas Music and Arts brought back the rendering for the blank space available on the Shady Lane Mural wall. Culturas Music and Arts brought back the rendering and the Cultural and Arts Commission recommended this item for Council’s final approval at its meeting held on September 27, 2022.

BACKGROUND:

On January 1, 2011, the City Council approved Ordinance No. 1034 establishing an Art in Public Places Program and implementing a new development impact fee for certain new construction, remodeling and reconstruction of public art installations. The purpose of the Art in Public Places ordinance is to develop and maintain a visual arts program for the residents and visitors of Coachella, to add to the economic vitality of the community, and to enhance the environment and unique character of Coachella by providing for the acquisition and maintenance of quality works of public art.

DISCUSSION/ANALYSIS:

The submitted proposal is to restore the existing art murals along Shady Lane between Bagdad Street and Avenue 52. Last November marked the tenth anniversary of the installation of the murals. Each mural that needs to be repainted is 50’ x 6’ in size and Culturas Music and Arts intends to clean and reseal them with anti-graffiti sealer. It is the intention of Culturas Music and Arts to have the original artists work on restoring their respective murals, if they are available— otherwise, other local artists will be sought. The original murals were painted using Nova Color Paint, which is the best paint product in the industry to use on outdoor murals. One mural will be repainted and it is the “low rider” mural, which will be painted by an artist named Alvarez Ink (sample works below)

Page 361 ends

Item 33.

According to Culturas Music and Arts, the Shady Lane Murals are the oldest Chicano public art murals in the State of California. The Shady Lane Murals are a beloved public art landmark for the community because they depict the community’s history and heritage., which might explain why it has escaped all the graffiti and tagging it used to get for nearly a decade.

Budget
Installation Costs – Labor (Artists Stipends) $4,000
Fabrication Costs – Materials $1,000
Fabrication Costs – Paint $5,000
Fabrication Costs – Resealing $3,000
TOTAL $13,000
Rendering for available mural space (by artist Alvarez Ink) Samples of art works by Artist

A Segment of the Shady Lane Murals

Page 362 ends

Item 33.

ALTERNATIVES:

1. Not Approve an Art in Public Places Program Proposal to Restore the Shady Lane Murals by Culturas Music and Arts in the Amount of $13,000

2. Provide Alternative Direction
FISCAL IMPACT:

If the City Council approves the staff recommendation, the $13,000 will be appropriated from the Special Revenue Funds (130) – Development Impact Fees for Public Art for Fiscal Year 2022-23.

Page 363 ends

Item 33.

STAFF REPORT
10/12/2022
TO: Honorable Mayor and City Council Members
FROM: Dr. Gabriel Martin, City Manager
SUBJECT: Memorandum of Understanding (MOU) with Twenty-Nine Palms Mission Indians in Regards to the Dillon Road Corridor Improvement Project STAFF RECOMMENDATION:

Staff recommends that the City Council approve the Memorandum of Understanding (MOU) with Twenty-Nine Palms Bands of Mission Indians and the City of Coachella in regards to the Dillon Road Corridor Improvement Project
BACKGROUND:

The Twenty-Nine Palms Band of Mission Indians (“Tribe”) is a federally recognized Indian tribe, and is empowered and authorized to contract on its own behalf. The Tribe operate and owns the Spotlight 29 Casino located at 46200 Harrison Place, Coachella, CA 92236.

The Tribe are descendants of the Chemehuevi people, a peaceful and nomadic Tribe whose territory once covered parts of California, Utah, Arizona, and Southern Nevada. The Twenty-Nine Palms Band settled at the sacred site known as the Oasis of Mara, located near the town of Twentynine Palms, California. With the European occupation of the West, many Tribal members were relocated to the Coachella Valley and Banning Pass areas. The Twenty-Nine Palms Reservation was established by the Executive Order of 1895 in Twenty-nine Palms, CA. The Reservation was expanded in 1979 with an additional parcel in Coachella, California.

Today, the Tribe has established business enterprises and governmental operations on its sovereign lands, with Spotlight 29 Casino and the Tribal Government Offices near the city of Coachella, and Tortoise Rock Casino near the town of Twenty-nine Palms. The Tribe provides employment to over 700 people, contributes to the community through charitable contributions, and supports the Tribe’s government operations and programs. The Tribal Administration manages all the tribal affairs and general welfare programs for the tribal membership. The Tribe has obtained several federal grants and has demonstrated its capability in managing programs that support its infrastructure.

DISCUSSION/ANALYSIS:

This Agreement is being entered into for the purpose of establishing communication and

Page 364 ends

Item 34.
coordination between the Tribe and Coachella on construction and maintenance work on the portion of Dillon Road within the Reservation lands of the Tribe. It is not intended to limit or otherwise alter, enhance, or limit the respective jurisdiction of either the Tribe or Coachella.

This Agreement does not authorize exchange of currency, regardless of the source, between the two parties. Rather, the Parties will continue discussions, in good faith, and develop further commitments regarding their respective contributions and cost and resource sharing on the Dillon Road Corridor Improvement Project. The Parties commit to engage in regular government-togovernment meetings to review the planning, construction, and financial investments for the Dillon Road Corridor Improvement Project at no less than monthly intervals. During such meetings, the Parties commit to providing appropriate decision-making personnel in attendance.

The Parties agree that the Dillon Road Corridor Improvement Project will include the following elements:
(a) Improved traffic signalization, signage, and other traffic control devices. (b) Beautification and landscaping of the center medians and along the road frontage. (c) Dillon Road Bridge replacement.
(d) Lane expansion from four to six lanes of traffic.
(e) Improvements to Dillon Road intersections with CV-Link, crosswalks, and green path.
(f) Dedicated turn-in/turn-out locations, lanes and construction of new entrance to Spotlight 29 Casino.
(g) Improvements to utility infrastructure.
(h) Beautification and landscaping to Dillon Road interchanges with Interstate 10 and Highway 86.

The Parties agree that further discussions on the Dillon Road Corridor Improvement Project may result in further amendment to the items listed above.

ALTERNATIVES:

1. To not approve MOU and provide new direction to Staff FISCAL IMPACT:

No Fiscal Impact
ATTACHMENT(S):
 Memorandum of Understanding (MOU) Agreement with Attachment “A”

Page 365 ends

Item 34.

TWENTY-NINE PALMS BAND OF MISSION INDIANS
AND

CITY OF COACHELLA

MEMORANDUM OF UNDERSTANDING (MOU)

REGARDING THE DILLON ROAD CORRIDOR IMPROVEMENT PROJECT

1. INTRODUCTION
This Memorandum of Agreement (“Agreement”) is entered into by the Twenty-Nine Palms Band of Mission Indians (“Tribe”) and the City of Coachella (“Coachella”) (individually “Party”, collectively “Parties”) for the purpose of establishing the Parties’ commitment to and responsibilities for certain construction and maintenance activities for a section of Dillon Road that traverses on the Reservation lands of the Tribe (“Dillon Road Corridor Improvement Project”).

This Agreement shall be effective as to the Tribe and Coachella on the date of adoption of the corresponding Resolution authorizing the Agreement by the Tribe and Coachella (the “Effective Date”).

2. AUTHORITY
This Agreement is entered into under the authority granted to each party by its respective governing body to enter into written agreements.

The City of Coachella is a public agency authorized and empowered to contract for the joint exercise of powers under Articles 1 through 4, Chapter 5, Division 7, Title 1 (commencing with Section 6500) of the Government Code of the State of California.

The Twenty-Nine Palms Band of Mission Indians is a federally recognized Indian tribe, and is empowered and authorized to contract on its own behalf.

3. SCOPE OF AGREEMENT
This Agreement is being entered into for the purpose of establishing communication and coordination between the Tribe and Coachella on construction and maintenance work on the portion of Dillon Road within the Reservation lands of the Tribe. It is not intended to limit or otherwise alter, enhance, or limit the respective jurisdiction of either the Tribe or Coachella.

This Agreement does not authorize exchange of currency, regardless of the source, between the two parties. Rather, the Parties will continue discussions and develop further commitments regarding their respective contributions and cost and resource sharing on the Dillon Road Corridor Improvement Project.

3.1. ELEMENTS OF DILLON ROAD CORRIDOR IMPROVEMENT PROJECT

Page 366 ends

Item 34.

Page 2 of 6 ends

The Parties agree that the Dillon Road Corridor Improvement Project will include the following elements:
(a) Improved traffic signalization, signage, and other traffic control devices. (b) Beautification and landscaping of the center medians and along the road frontage. (c) Dillon Road Bridge replacement.
(d) Lane expansion from four to six lanes of traffic.
(e) Improvements to Dillon Road intersections with CV-Link, crosswalks, and green path.
(f) Dedicated turn-in/turn-out locations, lanes and construction of new entrance to Spotlight 29 Casino.
(g) Improvements to utility infrastructure.
(h) Beautification and landscaping to Dillon Road interchanges with Interstate 10 and Highway 86.

The Parties agree that further discussions on the Dillon Road Corridor Improvement Project may result in further amendment to the items listed above.

3.2. GOOD FAITH
This Agreement is mutually beneficial because the Dillon Road Corridor Improvement Project will ensure critical improvements to a key corridor that serves the communities of the Tribe and Coachella. Therefore, each of the Parties agrees to use good faith efforts to cooperatively share resources during the Dillon Road Corridor Improvement Project to enhance the working function of this portion of Dillon Road. This includes communication, coordination, and adhering to the established rules and regulations of each Party.

3.3. COMMITMENT TO ENGAGE IN PRODUCTIVE MEETINGS
The Parties commit to engage in regular government-to-government meetings to review the planning, construction, and financial investments for the Dillon Road Corridor Improvement Project at no less than monthly intervals. During such meetings, the Parties commit to providing appropriate decision-making personnel in attendance.

4. SUPERVISION
When personnel and/or equipment are furnished under this Agreement, the Party dispatching personnel and/or equipment shall have responsibility for supervising said personnel and/or equipment. The presiding policies and procedures of each Party shall prevail during their supervision of their respective resources. Personnel dispatched from either Party remains an employee of that Party and is subject to the personnel policies solely of that Party.

5. WAIVERS
Each Party (“Indemnitor”) hereby agrees to defend, indemnify and hold free and harmless

Page 367 ends

Item 34.

Page 3 of 6 ends

the other Party (“Indemnitee”) from and against any and all liability, expense, including defense costs and legal fees, and claims for damages of any nature whatsoever, including, but not limited to, bodily injury, personal injury, death or property damage, arising from or connected with the Indemnitor’s activities under this Agreement, including any Worker’s Compensation suits, liability, or expense, arising from or connected with services performed on behalf of Indemnitor by any person pursuant to this Agreement, whether such claims, damages, liabilities, costs and/or judgments are based upon alleged negligence, a dangerous condition of public property, or any other theory of liability. Indemnitor’s duty to indemnify Indemnitee shall survive the expiration or other termination of this Agreement as to any injuries, occurrences or claims occurring or alleged to have occurred prior to its expiration or termination.

6. TERM AND TERMINATION
The Term of this Agreement shall commence on the Effective Date and renew automatically on each anniversary thereafter. Any Party hereto may terminate this Agreement at any time by giving thirty (30) days’ written notice of the intention to do so to the other Party. Such notice shall be sent to the governing body of the other Party.

7. BENEFIT STATUS
The Parties hereto recognize and agree that under this Agreement employee health and retirement benefits accrue in the manner prescribed by the employee's regular employment and are the responsibility of the regular employer as if the employee were performing the employee's regular duties. No additional benefits arise due to participation in assistance under this Agreement.

8. ASSIGNMENTS/SUBCONTRACTS
Except as expressly provided herein, the Parties hereto recognize and agree not to assign, sell, transfer, and subcontract or sublet rights, or delegate responsibilities under this Agreement, in whole or in part, without the prior written approval of the other Party hereto.

9. SUCCESSORS IN INTEREST
The provisions of this Agreement shall be binding upon and inure to the benefit of all Parties to this Agreement and to their respective successors and assigns.

10. COMPLIANCE WITH GOVERNMENT REGULATIONS
Each Party to this Agreement agrees to comply with federal laws, codes, and regulations applicable to the work performed under this Agreement.

11. FORCE MAJEURE

Page 368 ends

Item 34.

Page 4 of 6 ends

No Party to this Agreement shall be held responsible for delay or default caused by fires, riots, acts of God and/or war, which is beyond the reasonable control of the Parties.

12. RELATIONSHIP OF THE PARTIES
Nothing contained in this Agreement shall be deemed or construed by the Parties or by any third person to create the relationship of principal and agent, or partnership or joint venture, or any association between the Tribe and Coachella, and none of the provisions contained in this Agreement or any act of the Parties shall be deemed to create any relationship other than as specified herein, nor shall this Agreement be construed, except as expressly provided herein, to authorize either Party to act as the agent for the other.

13. SEVERABILITY
If any provision of this Agreement is declared by a court having jurisdiction to be illegal or in conflict with any applicable law, the validity of the remaining terms and provisions shall not be affected; the rights and obligations of the Parties shall be construed and enforced as if this Agreement did not contain the particular provision held to be invalid.

14. AMENDMENTS
The terms and conditions of this Agreement shall not be waived, altered, modified, supplemented, or amended in any manner whatsoever without prior written approval of the Parties hereto.

15. DISPUTE RESOLUTION
This Agreement shall be governed by and construed in accordance with the laws of the United States of America as interpreted by the United States Federal Courts. However, the Parties may attempt to resolve any dispute arising under this Agreement by any appropriate means of dispute resolution, except binding arbitration.

16. SIGNATURES
Each of the undersigned warrants and represents that he is duly authorized to execute this Agreement on behalf of his respective jurisdiction and to bind the staff representing such entity.

Page 369 ends

Item 34.

Page 5 of 6 ends

TWENTY-NINE PALMS BAND OF MISSION INDIANS
By:

Signature Date
Name: Darrell Mike
Its: Tribal Chairman

CITY OF COACHELLA
By:

Signature Date
Name: Steven Hernandez
Its: Mayor

Page 370 ends

Item 34.

Page 6 of 6 ends

Attachment “A” - Map of Maintenance Area

Page 371 ends

Item 34.

← All documents from this meeting