City Council Chamber
1515 6th Street, Coachella, California
(760) 398-3502 www.coachella.org
AGENDA
OF A REGULAR MEETING
OF THE
CITY OF COACHELLA
PLANNING COMMISSION
May 01, 2024
6:00 PM
In-Person Meeting
Location:
City Council Chamber
1515 6th Street,
Coachella, CA
If you would like to attend the meeting via Zoom, here is the link:
https://us02web.zoom.us/j/84544257915?pwd=VTdHWitpYVdOUk1NQW8vZ1pqUm0zQT 09 Or One tap mobile : +16694449171,,84544257915#,,,,*380084# Or Telephone:
US: +1 669 900 6833
Webinar ID: 845 4425 7915
Passcode: 380084
Spanish: El idioma español está disponible en Zoom seleccionado la opción en la parte de abajo de la pantalla
Public comments may be received either in person, via email, telephonically, or via Zoom with a limit of 250 words, or three minutes:
o In Real Time:
If participating in real time via Zoom or phone, during the Public Comment Period, use the “raise hand” function on your computer, or when using a phone, participants can raise their hand by pressing *9 on the keypad.
o In Writing:
Written comments may be submitted to the City Council electronically via email to [email protected]. Transmittal prior to the start of the meeting is required. All written comments received will be forwarded to the City Council and entered into the record. o If you wish, you may leave a message at (760) 262-6240 before 5:30 p.m. on the day of the meeting. The live stream of the meeting may be viewed online by accessing the city's website at www.coachella.org, and clicking on the "Watch Council Meetings" tab located on the home page, and then clicking on the "live" button.
1 CALL TO ORDER:
PLEDGE OF ALLEGIANCE:
ROLL CALL:
APPROVAL OF AGENDA:
“At this time the Commission may announce any items being pulled from the agenda or continued to another date or request the moving of an item on the agenda.”
APPROVAL OF THE MINUTES:
1. Planning Commission Meeting Minutes April 17, 2024
WRITTEN COMMUNICATIONS:
PUBLIC COMMENTS (NON-AGENDA ITEMS):
“The public may address the Commission on any item of interest to the public that is not on the agenda, but is within the subject matter jurisdiction thereof. Please limit your comments to three (3) minutes.” REPORTS AND REQUESTS:
NON-HEARING ITEMS:
2. Code Enforcement Update - Commercial Centers
PUBLIC HEARING CALENDAR (QUASI-JUDICIAL):
3. CUP No. 254 (Modification), AR No. 24-02 Coachella Gateway – a modification to add a drive-thru multitenant commercial building within the Coachella Gateway shopping center approved under CUP No. 254 at the southwest corner of Ave 48 and Grapefruit Boulevard, adjacent to the Dillon Bridge. Applicant: Chandi & Karan LLC
4. CUP 375 AR No. 23-14 – Coachella Islamic Center Parking Lot for the construction of a parking lot to serve the existing building at 84650 Ave 49. Applicant: Islamic Society of Palm Springs. Recommendation:
Continue to May 15, 2024.
INFORMATIONAL:
ADJOURNMENT:
Complete Agenda Packets are available for public inspection at the City Clerk’s Office at 53-462 Enterprise Way, Coachella, California, and on the City’s website www.coachella.org.
THIS MEETING IS ACCESSIBLE TO PERSONS WITH DISABILITIES 2 City Council Chamber
1515 6th Street, Coachella,
(760) 398-3502
www.coachella.org
AGENDA
DE UNA REUNIÓN DE LA
COMISIÓN DE PLANIFICACIÓN
PLANNING COMMISSION
1 de Mayo, 2024
6:00 PM
https://us02web.zoom.us/j/84544257915?pwd=VTdHWitpYVdOUk1NQW8vZ1pqUm0zQT09 O one tap mobile:
Us: +16699006833,, 84544257915#,,,,* 380084# US
O teléfono:
Us: +1 669 900 6833
ID del webinar: 845 4425 7915
Código de acceso: 380084
Español: El idioma español está disponible en Zoom seleccionado la opción en la parte de abajo de la pantalla Los comentarios públicos se pueden recibir por correo electrónico, por teléfono o por zoom con un límite de 250 palabras o tres minutos:
En vivo:
Si participa en vivo a través de zoom o teléfono, durante el período de comentarios públicos, use la función "levantar la mano" en su computadora, o cuando use un teléfono, los participantes pueden levantar la mano presionando *9 en el teclado.
Por escrito:
Los comentarios escritos pueden enviarse a la comisión electrónicamente por correo electrónico a [email protected]. Se requiere la transmisión antes del inicio de la reunión. Todos los comentarios escritos recibidos serán enviados a la comisión e ingresados en el registro.
SI LO DESEA, PUEDE DEJAR UN MENSAJE EN EL (760) 398-3102, EXTENSIÓN 122, ANTES DE LAS 4:00 P.M. DEL DÍA DE LA REUNIÓ
3 LLAMADO AL ORDEN:
JURAMENTO A LA BANDERA:
PASE DE LISTA:
APROBACIÓN DE LA
AGENDA:
“En este momento, la Comisión puede anunciar cualquier punto que está siendo retirado de la agenda o continuado a otra fecha o solicitar el traslado de un punto de la agenda”.
APROBACION DE LAS ACTAS:
1. Borrador de las Actas de la Comisión de Planificación – 17 de Abril 2024.
COMUNICACIONES ESCRITAS:
COMENTARIOS DEL PÚBLICO (PUNTOS QUE NO ESTÁN EN LA AGENDA):
“El público puede dirigirse a la Comisión sobre cualquier tema de interés para el público que no esté en la agenda, pero que esté dentro de la jurisdicción de la materia de la misma. Por favor limite sus comentarios a tres
(3) minutos”.
INFORMES Y SOLICITUDES:
PUNTOS QUE NO SON DE AUDIENCIA:
2. Actualización sobre la aplicación del código: centros comerciales CALENDARIO DE AUDIENCIAS PÚBLICAS (CUASI-JUDICIAL):
1. CUP No. 254 (Modificación), AR No. 24-02 Coachella Gateway: una modificación para agregar un edificio comercial de múltiples inquilinos con servicio de autoservicio dentro del centro comercial Coachella Gateway aprobado bajo CUP No. 254 en la esquina suroeste de Ave 48 y Grapefruit Boulevard, adyacente al puente Dillon.
Solicitante: Chandi & Karan LLC
2. AR No. 23-14 CUP 375 Estacionamiento del Centro Islámico de Coachella para la construcción de un estacionamiento para servir al edificio existente de la Sociedad Islámica de Coachella de Palm Springs en 84650 49th Avenue. Solicitante: Sociedad Islámica de Palm Springs INFORMATIVO:
SE SUSPENDE LA SESIÓN:
4 Agenda Planning Commission May 01, 2024
ESTA REUNIÓN ES ACCESIBLE PARA PERSONAS CON DISCAPACIDAD Los paquetes completos de la agenda están disponibles para inspección pública en el Departamento de Servicios de Desarrollo en 53-990 Enterprise Way, Coachella, California, y en el sitio web de la ciudad www.coachella.org.
5 City Council Chamber
1515 6th Street, Coachella, CA
(760) 398-3502 www.coachella.org
MINUTES
OF AREGULARMEETING
OF THE
CITY OFCOACHELLA
PLANNING COMMISSION
April 17, 2024
6:00 PM
If you would like to attend the meeting via zoom, here is the link:
https://us02web.zoom.us/j/84544257915?pwd=VTdHWitpYVdOUk1NQW8vZ1pqUm0zQT09 Or one tap mobile :
Us: +16699006833,, 84544257915#,,,,* 380084# US
Or telephone:
Us: +1 669 900 6833
Webinar ID: 845 4425 7915
Passcode: 380084
Spanish: El idioma español está disponible en Zoom seleccionado la opción en la parte de abajo de la pantalla Public comments may be received via email, telephonically, or via zoom with a limit of 250 words, or three minutes:
In real time:
If participating in real time via zoom or phone, during the public comment period, use the “raise hand” function on your computer, or when using a phone, participants can raise their hand by pressing *9 on the keypad.
In writing:
Written comments may be submitted to the commission electronically via email to [email protected]. Transmittal prior to the start of the meeting is required. All written comments received will be forwarded to the commission and entered into the record.
IF YOU WISH, YOU MAY LEAVE A MESSAGE AT (760) 398-3102, EXTENSION 122, BEFORE 4:00 P.M. ON THE DAY OF THE MEETING
6 Item 1.
CALL TO ORDER: 6:02 PM
PLEDGE OF ALLEGIANCE:
Alternate Commissioner Fonseca.
ROLL CALL:
Commissioners Present: Commissioner Arvizu, Chair Hernandez, Vice Chair Gonzalez, Commissioner Ramirez, Alternate Commissioner Fonseca.
Commissioners Absent: Commissioner Murillo.
Staff Present: *Gabriel Perez, Development Services Director. *Adrian Moreno, Associate Planner.
*Andrew Simmons, City Engineer
*Jesus Medina, Information Technology Technician
APPROVAL OF AGENDA:
“At this time the Commission may announce any items being pulled from the agenda or continued to another date or request the moving of an item on the agenda.”
IT WAS MOVED BY COMMISSIONER RAMIREZ AND SECONDED BY COMMISSIONER ARVIZU TO APPROVE THE AGENDA AND TABLE ITEMS THREE (3) AND FOUR (4).
Approved by the following roll call vote:
AYES: Commissioner Ramirez, Vice Chair Gonzalez, Chair Hernandez, Commissioner Arvizu, Alternate Commissioner Fonseca.
NOES: None.
ABSTAIN: None.
ABSENT: Commissioner Murillo.
APPROVAL OF THE MINUTES:
1. Planning Commission Meeting Minutes – March 20, 2024.
IT WAS MOVED BY COMMISSIONER RAMIREZ AND SECONDED BY ALTERNATE COMMISSIONER FONSECA TO APPROVE THE MINUTES.
Approved by the following roll call vote:
AYES: Vice Chair Gonzalez, Commissioner Ramirez, Alternate Commissioner Fonseca, Commissioner Arvizu, and Chair Hernandez.
NOES: None.
ABSTAIN: None.
ABSENT: Commissioner Murillo.
WRITTEN COMMUNICATIONS:
None.
PUBLIC COMMENTS (NON-AGENDA ITEMS):
7 Item 1.
“The public may address the Commission on any item of interest to the public that is not on the agenda, but is within the subject matter jurisdiction thereof. Please limit your comments to three (3) minutes.” REPORTS AND REQUESTS:
None.
NON-HEARING ITEMS:
2. CUP 364 1-Year Time Extension – AMPM – Type 21 Alcohol Sales for the 1-year time extension for CUP 364 for (ABC License Type 21, Off-Sale General) at the “AMPM” convenience store at 48055 Grapefruit Blvd. Applicant: GSC & Son Corporation
Adrian Moreno, Associate Planner, informed the Planning Commission that this item will be tabled due to CUP 364 not needing a 1-year time extension.
3. Coachella Valley Apartments 1st 1-Year Time Extension Architectural Review No. 22-12. The project consists of a proposed development of a 242-unit multi-family residential gated community with 15 buildings totaling 223,740 square feet on 9.7 acres of vacant land located near the southwest corner of Van Buren Street and Avenue 48. HCM Development (Applicant).
Item tabled.
PUBLIC HEARING CALENDAR (QUASI-JUDICIAL):
4. CUP 375 AR No. 23-14 – Coachella Islamic Center Parking Lot for the construction of a parking lot to serve the existing building at 84650 Ave 49. Applicant: Islamic Society of Palm Springs.
Item tabled.
5. La Mango – Type 40 ABC License Conditional Use Permit No. 378 to allow liquor sales (ABC Type 40, On-Sale Beer) within a 1,711 SF restaurant located at 51704 Cesar Chavez Street. Applicant: Arlent Irani Torres Cardenas.
Adrian Moreno, Associate Planner, gave a brief presentation for the item. A copy of the presentation is on file in the Planning Division.
Public Hearing Opened at 6:14pm by Chair Hernandez
Arlent Irani Torres Cardenas, Applicant, spoke and provided comments.
Public Hearing Closed at 6:20pm by Chair Hernandez
IT WAS MOVED BY VICE CHAIR GONZALEZ AND SECONDED BY COMMISSIONER ARVIZU ADOPT RESOLUTION NO. PC 2024-09 APPROVING CONDITIONAL USE PERMIT NO. 378 TO ALLOW LIQUOR SALES (ABC TYPE 40, ON-SALE BEER) WITHIN A 1,711 SF RESTAURANT LOCATED AT 51704 CESAR CHAVEZ STREET WITH THE FOLLOWING REQUEST:
REPORT BACK TO THE PLANNING COMMISSION IN 6 MONTHS ON CODE ENFORCEMENT EFFORTS TO BRING SITE CONDITIONS INTO COMPLIANCE.
Approved by the following roll call vote:
8 Item 1.
AYES: Commissioner Arvizu, Alternate Commissioner Fonseca, Commissioner Ramirez, Vice Chair Hernandez, Chair Gonzalez.
NOES: None.
ABSTAIN: None.
ABSENT: Commissioner Murillo.
6. Encanto Project Change of Zone No. 24-01, Tentative Tract Map No 38429, Conditional Use Permit No. 376, Architectural Review No. 22-11, Environmental Assessment No. 22-04 a proposal to subdivide 19.2 acres into 111 single family lots with a minimum lot size of 4,500 square feet with seven single family residential production model homes located west of Van Buren Street, between Avenue 51 and Avenue 52, APN 779-360-001; Applicant: Joseph Rivani, Global Investment and Development.
Gabriel Perez, Development Services Director, gave a brief presentation for the item. A copy of the presentation is on file in the Planning Division.
Public Hearing Opened at 7:02pm by Chair Hernandez
Rich Malacoff, Applicant representative, spoke and provided comments.
Public Hearing Closed at 7:05pm by Chair Hernandez
IT WAS MOVED BY ALTERNATE COMMISSIONER FONSECA AND SECONDED BY VICE CHAIR GONZALEZ TO ADOPT RESOLUTION NO. PC 2024-10 APPROVING CHANGE OF ZONE NO. 24-01, TENTATIVE TRACT MAP NO. 38429, CONDITIONAL USE PERMIT NO. 376, ARCHITECTURAL REVIEW NO. 22-11, ENVIRONMENTAL ASSESSMENT NO. 22-04 A PROPOSAL TO SUBDIVIDE 19.2 ACRES INTO 111 SINGLE FAMILY LOTS WITH A MINIMUM LOT SIZE OF 4,500 SQUARE FEET WITH
SEVEN SINGLE FAMILY RESIDENTIAL PRODUCTION MODEL HOMES LOCATED WEST OF VAN BUREN STREET BETWEEN AVENUE 51 AND AVENUE 52, APN: 779-360-001 WITH THE FOLLOWING CONDITION:
NO OWNER SHALL BE PERMITTED TO RENT OR LEASE SUCH OWNER’S LOT FOR TRANSIENT OR HOTEL PURPOSES, OR FOR A PERIOD OF LESS THAN 30 DAYS UNLESS
PERMITTED BY THE CITY TWO YEARS AFTER THE FINAL OCCUPANCY PERMIT IS ISSUED FOR TR. 38557, CUP 372, AND AR 23-13.
Approved by the following roll call vote:
AYES: Commissioner Arvizu, Alternate Commissioner Fonseca, Vice Chair Hernandez, Chair Gonzalez, Commissioner Ramirez.
NOES: None.
ABSTAIN: None.
ABSENT: Commissioner Murillo.
INFORMATIONAL:
Director’s Development Updates
City of Coachella is recommended for a Community Resilience Centers Implementation Grant award.
Final award decisions will be made at the SGC Council Meeting on April 24, 2024. City of Coachella will be receiving an Inland Empire Section APA award for the pre-approved ADU plan effort.
Farmchella will be taking place Thursday, April 18, 2024. 9 Item 1.
Carin Leon will be receiving the Key to the City on Saturday, April 20, 2024 at 10:30am.
Respectfully Submitted by,
Gabriel Perez
Planning Commission Secretary
ADJOURNMENT: 7:45 PM
THIS MEETING IS ACCESSIBLE TO PERSONS WITH DISABILITIES Complete Agenda Packets are available for public inspection in the Development Services Department at 53-990 Enterprise Way, Coachella, California, and on the City’s website www.coachella.org.
10 Item 1.
11 Item 1.
STAFF REPORT
5/1/2024
TO: Planning Commission Chair and Commissioners
FROM: Adrian Moreno, Associate Planner
SUBJECT: CUP No. 254 (Modification), AR No. 24-02 Coachella Gateway – a modification to add a drive-thru multi-tenant commercial building within the Coachella Gateway shopping center approved under CUP No. 254 at the southwest corner of Ave 48 and Grapefruit Boulevard, adjacent to the Dillon Bridge. Applicant:
Chandi & Karan LLC
STAFF RECOMMENDATION:
Staff recommends that the Planning Commission adopt Resolution No. PC2024-11 adopting CUP 254 (MOD) and AR No. 24-02, subject to the findings and conditions attached to this staff report.
BACKGROUND:
On December 12, 2012, the Planning
Commission approved Conditional Use
Permit Nos. 254 and 256, Tentative Parcel
Map 36481, and Architectural Review
No. 12-07 for the refurbishment of an
existing service station/mini-market and
the construction of four new commercial
buildings on 4.85 acres on the southwest
corner of Avenue 48 and Grapefruit
Boulevard. On June 3, 2015, Planning
Commission approved a 24-month
retroactive time extension for the project.
On October 21, 2015, Planning
Commission approved a modification to
the original approved project to add a new
drive-thru restaurant and other site
modifications. On June 7, 2017, Planning Commission approved a sign program for the site. On April 19, 2023, Planning Commission approved Conditional Use Permit No. 364 to allow ABC License Type 21 at the AMPM at the subject site at 48055 Grapefruit Blvd.
The applicant requests a second modification to the site to add a drive-thru for a multi-tenant commercial building originally approved as a stand-alone sit-down restaurant under CUP No. 254. 12 Item 3.
The building was originally approved for a sit-down restaurant. The building is on Grapefruit Boulevard, adjacent to the Dillon Bridge.
DISCUSSION/ANALYSIS:
The surrounding land uses and zoning designations are as follows:
North: Tower Market (City of Indio).
South: Dillon Bridge (C-G, General Commercial).
East: Grapefruit Boulevard and Union Pacific Railroad
West: Dillon Road/Bridge and vacant lot/old Glenroy Hotel Project site (C-G, General Commercial)
Site Plan
The exhibit below illustrates the proposed modification to the site plan layout for the proposed 4,605 SF drive-thru restaurant a modification from the original plan for a sit-down restaurant. A double-drive thru entrance is proposed that merges into one drive thru-lane and wraps around the south and east sides of the building. There project will construct 26 new off-street parking spaces, a total of 20 are at the north and west ends of the building. There is a new landscape island to the north of the building with 6 adjacent parking spaces, and a new trash enclosure. 13 Item 3.
The building is proposed as a 4,605 SF retail shell building consisting of 2 retail tenants and 1 quick-stop retail tenant. There is no proposed floor plans for the 2 retail tenants at this time, however the floor plan for the 1 quick stop retail tenant proposes 1,299 SF of non-customer area and 107 SF of customer area. The drive-thru serves the quick-stop retail tenant, which includes a walk-up window intended for quick stop rather than a customer area with seating and tables customary of other Coachella drive thru fast food establishments.
The applicant proposes high quality elevations for the project with both horizontal and vertical modulation, a compatible desert color scheme, and textured exterior finishes. The applicant proposes a metal canopy over the drive-thru window and building entrances at the north elevation.
The applicant also proposes an 8 foot tall trash enclosure structure with steel doors and CMU wall.
The trash enclosure provides a high quality design with a color scheme that is compatible with buildings on-site.
LANDSCAPING
The project proposes a new conceptual landscape plan for the parcel of the subject building. The on-site landscaping includes landscaping around the building, landscape medians, and landscape common area. Landscaping is composed of various shrubs, palm trees, shade trees adjacent to parking, vines adjacent to the trash enclosure, and a landscaped median between the proposed double drive-thru lane. All landscape areas around the subject building provide ¾ crushed rock with several desert shrub varieties that include red bird of paradise and desert accents that include red yucca. Palm trees are proposed at common area landscape areas adjacent to the public rightof-way to match existing, and 24” box mulga trees provide shade to on-site parking near the subject building. There is a landscape median at the two entry drive-thru entrance proposed with ¾ inch gravel and lantana shrubs. Staff will require additional on-site landscape improvements that include vines adjacent to new structures, increasing the landscaped area that adjoins the existing car wash, and landscape improvements to the entire center to provide a unified look that may include adding shade trees, ¾ inch rock, and/or large stones. Staff discussed adding conditions of approval for the project to improve the bridge dirt berm area. Instad staff request the applicant provide complete access to the City to south berm adjacent to the Dillon Bridge to ensure improvements can be made by the City.
As a condition of approval, a final landscape, lighting, and irrigation plan will be required for the Figure 1 East Elevation East Elevation - Facing Grapefruit Boulevard Facing Grapefruit Boulevard Figure 2 Northeast Elevation 14 Item 3.
project. As a condition of approval, Staff will require landscape improvements for the entire center along landscape areas visible from the public R.O.W.
SIGNAGE
The applicant proposes a modification to the sign program previously approved for the center. The proposed modified sign program provides a new modified site plan, and new elevations that show signage locations for the modified 4,605 SF subject building and modified pylon directory sign.
The sign program is amended to add additional regulations pertaining to roof signs, exterior merchandise signs, electronic message board signs, and more regulations that are pulled from the Coachella Sign Ordinance. There are specific regulations on pylon directory signs prohibiting flat signs, moving electronic signs, and that lights shall only shine through individual letters.
The previously approved 25 foot tall directory sign incorporated a plastic and aluminum design at approximately 135 SF of tenant signage at each sign face and was never completed. The new proposed 25 foot tall directory sign proposes a stucco textured finish and a cement board finish with a wooden appearance. There is approximately 86 SF of tenant signage at each sign face, with approximately 38 SF of sign face dedicated to City of Coachella branded signage. The improved signage materials, color scheme, and reduction of tenant signage at each sign face provides a high quality design that is an improvement from the original design. Also, as a condition of approval, the existing on-site billboard sign adjacent to Grapefruit Boulevard shall be removed.
PARKING
The applicant proposes 26 new parking spaces to serve the subject commercial building. The project proposes 3 tenants, with 1 of those tenants being a quick stop retail (QSR) restaurant. The Figure 2 Old Design Directory Sign
Figure 3 New Modified Directory Sign
15 Item 3.
restaurant requires 10 parking spaces. The other two tenants parked at the standard commercial retail ratio will require 12 parking spaces. The building requires 22 parking spaces, and 26 are provided, the amount of proposed parking is sufficient for the proposed use. There may be tenants in the future that require a higher parking ratio, for this reason the center is conditioned to allow the Director of Development Services to require parking improvements that meet the parking needs of the site.
ENVIRONMENTAL REVIEW:
The Planning Division has determined that the proposed project is categorically exempt from environmental review pursuant to the guidelines of the California Environmental Quality Act as “In-Fill Development” (CEQA Guidelines, Section 15301). The proposed project consists of the development within city limits on a project site of no more than five acres substantially surrounded by urban uses. This was a previously approved project, and this is a modification of that approved project.
ALTERNATIVES
1) Adopt Resolution No. PC2024-11 approving Conditional Use Permit 254 (Modification) and Architectural Review No. 24-02 with the findings as recommended by Staff. 2) Adopt Resolution No. PC2024-11 with the findings and conditions as recommended by Staff with modifications as proposed by the Planning Commission. 3) Not approve Resolution No. PC 2024-11 and request that staff prepare a Planning Commission Resolution for denial of Conditional Use Permit 254 (Modification) and Architectural Review No. 24-02.
4) Continue this item and provide staff and the applicant with direction.
RECOMMENDED ALTERNATIVE(S):
Staff recommends that the Planning Commission approve Alternative #1.
Attachments:
1. Resolution PC2024-11
a. Exhibit A – Conditions of Approval
b. Exhibit B – 2015 Conditions of Approval
c. Exhibit C – Modified Development Plan Set
d. Exhibit D – Original Development Plan Set
2. Aerial Photo
3. Outside Agency Comments
16 Item 3.
ATTACHMENT 1
Resolution No. PC2024-11
RESOLUTION NO. PC 2024-11
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
COACHELLA, CALIFORNIA APPROVING CONDITIONAL USE
PERMIT MODIFICATION AND ARCHITECTURAL REVIEW FOR
THE ADDITION OF A DRIVEWAY AND FOR DEVELOPMENT OF
THE 4,605 SF BUILDING LOCATED AT THE SOUTHWEST CORNER
OF GRAPEFRUIT BOULEVARD AND AVENUE 48, ADJACENT TO
THE DILLON BRIDGE. CHANDI & KAREN LLC, APPLICANT.
WHEREAS, Chandi and Karan LLC filed an application for a Conditional Use Permit Modification and Architectural Review for the addition of a driveway and for development of the 4,605 SF building located at the southwest corner of Grapefruit Boulevard and Avenue 48, adjacent to the Dillon Bridge (APN: 603-220-056, 603-220- 057, 603-220-058, 603-220-059); and,
WHEREAS, on November 7, 2012, the Planning Commission conducted a duly noticed public hearing on the originally approved project.
WHEREAS, on October 21, 2015, the Planning Commission conducted a duly noticed public hearing on the modification on the approved project and adopted, with the conditions as set forth in those resolutions attached as Exhibit “B”.
WHEREAS, on May 1, 2024, the Planning Commission conducted a duly noticed public hearing on the proposed second modification to the project in the subject application, considered written and oral comments, and facts and evidence presented by the applicant, City staff, and other interested parties; and
WHEREAS, the Applicant and members of the public were present and were afforded an opportunity to testify regarding the Project; and, WHEREAS, the proposed use is necessary or desirable for the development of the community, is consistent with the objectives of the City’s General Plan, and is not detrimental to the existing uses or the uses specifically permitted in the zone in which the proposed use is to be located; and,
WHEREAS, the proposed site is adequate in size and shape to accommodate the proposed development; and,
WHEREAS, the site for the proposed use relates properly to streets which are designed to carry the type and quantity of traffic to be generated by the proposed use; and, WHEREAS, the proposed project is exempt from the California Environmental Quality Act, as amended; and,
WHEREAS, the conditions of approval as stipulated by the City are necessary to protect the public health, safety and welfare of the community. 17 Item 3.
ATTACHMENT 1
Resolution No. PC2024-11
NOW, THEREFORE, BE IT RESOLVED, THE PLANNING COMMISSION OF
THE CITY OF COACHELLA, CALIFORNIA DOES HEREBY FIND
DETERMINE AND RESOLVE AS FOLLOWS:
SECTION 1. Recitals. The above recitals are true and correct and incorporated herein as findings of fact.
SECTION 2. CEQA Findings.
Based upon its review of the entire record, including the Staff Report, any public comments or testimony presented to the Planning Commission, and the facts outlined below, the Planning Commission hereby finds and determines that the proposed project is categorically exempt from environmental review pursuant to the guidelines of the California Environmental Quality Act as an “In-Fill Development” project (CEQA Guidelines, Section 15332) as the proposed project consists of the development within city limits on a project site of no more than five acres substantially surrounded by urban uses. This was a previously approved project, and this is a modification of that approved project and architectural review for new proposed elevations.
SECTION 3. Conditional Use Permit, Architectural Review Findings With respect to Conditional Use Permit No. 254 Modification and Architectural Review No. 24-02, the Planning Commission finds as follows for the addition of a driveway and for development of the 4,605 SF building located at the southwest corner of Grapefruit Boulevard and Avenue 48, adjacent to the Dillon Bridge.
1. The proposed conditional use permit modification and architectural review are consistent with the General Plan and the City of Coachella Official Zoning Map governing the site.
The subject site is a 4.85-acre site on four parcels with adequate access and lot dimensions to allow for the intended commercial development in a manner consistent with the Suburban Retail District land use designation of the General Plan and General Commercial Zoning Designation.
2. The proposed use will be located, designed, constructed, operated and maintained so as to be compatible with the existing or intended character of the general vicinity and shall not change the essential character of the same area. The modification to the project design to include addition of a driveway and development of the 4,605 SF building would be located in the General Commercial area and is compatible with existing adjacent uses that are similar land uses.
3. Consideration was given to harmony in scale, bulk, coverage and density, to the availability of public facilities and utilities, to harmful effect, in any, upon desirable neighborhood character, to the generation of traffic and the capacity of surrounding streets, and to any other relevant impact of the development. The proposed project uses are compatible uses with existing similar uses in the area. 18 Item 3.
ATTACHMENT 1
Resolution No. PC2024-11
4. Where the proposed use may be potentially hazardous or disturbing to existing or reasonable expected neighboring uses, it must be justified by the common public interest as a benefit to the community as a whole. The Development Services Department does not anticipate any potentially hazardous or disturbing impacts on existing or neighboring uses. The proposed use is anticipated to add an amenity to City residents and to the entire Coachella Valley in providing an anchor for the commercial corridor which would provide jobs and increase the City’s sales tax revenues.
SECTION 4. Location and Custodian of Records. The documents and materials that constitute the record of proceedings on which these findings are based are located at Coachella Civic Center. The Development Services Director is the custodian of the record of proceedings.
SECTION 5. Execution of Resolution. The Chairman shall sign this Resolution and the City Clerk shall attest and certify to the passage and adoption thereof.
SECTION 6. Planning Commission Approval Based on the foregoing recitals and findings above, and the written and oral comments, facts and evidence presented, the City of Coachella Planning Commission hereby approves Conditional Use Permit No. 254 Modification and Architectural Review No. 24-02 for the Coachella Gateway project subject to and amended by conditions of approval in “Exhibit A” and includes conditions of approval in “Exhibit B”, and the modified plans as set forth in “Exhibit C”, a modification of the original approved plans set forth in “Exhibit D”.
PASSED APPROVED and ADOPTED this 1
st day of May 2024.
__________________________________
Jason Hernandez, Chairperson
Coachella Planning Commission
ATTEST:
___________________________________
Gabriel Perez
Planning Commission Secretary
APPROVED AS TO FORM:
___________________________________
Carlos Campos
City Attorney
19 Item 3.
ATTACHMENT 1
Resolution No. PC2024-11
I HEREBY CERTIFY that the foregoing Resolution No. PC-2024-11, was duly adopted at a regular meeting of the Planning Commission of the City of Coachella, California, held on the 1
st day of May, by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
___________________________________
Gabriel Perez
Planning Commission Secretary
20 Item 3.
Resolution No. PC2024-11 EXHIBIT A
Exhibit A – Resolution No. PC2024-11
CONDITIONS OF APPROVAL FOR
CONDITIONAL USE PERMIT 254 (MODIFICATION) AND ARCHITECTURAL REVIEW NO. 24-02 COACHELLA GATEWAY
General Conditions
1.) The applicant shall comply with all requirements and conditions of approval as included in CUP 254, CUP 256, CUP 364, Tentative Parcel Map No. 36481, AR 12-07, and any modifications or extensions thereof, as listed in those Notice of Actions for each respective approval and City Council Resolution 2012-49 and Reso. No. PC2023-08.
2.) The applicant shall defend, indemnify and hold harmless the City of Coachella, its officials, officers, employees, and agents from and against any claim, action, or proceeding against the City, its officials, officers, employees or agents to attack, set aside, void or annul any project approval or condition of approval of the city concerning this project, including but not limited to any approval or condition of approval or mitigation measure imposed by the City Council or Planning Commission. The City shall promptly notify the applicant of any claim, action, or proceeding concerning the project and the City shall cooperate fully in the defense of the matter. The City reserves the right, at its own option, to choose its own attorney to represent the City, its officials, officers, employees and agents in the defense of the City Attorney, within five days of the effective date of this approval
3.) Prior to Certificate of Occupancy, missing offsite improvements shall be installed along Grapefruit Boulevard. Applicant shall install and continue sidewalk along the southeastern portion of the commercial center and continued under Dillon Bridge.
4.) Shade Trees shall be implemented along public right of way to the satisfaction of the Development Services Director.
5.) General Landscaping. The applicant shall submit a final landscape, lighting, and irrigations plans for review and approval by the Development Services Department with added low intensity landscape lighting. The final landscape plan shall be for the entire center, including existing and new landscape common areas along public R.O.W, landscape medians on Grapefruit Boulevard, site landscaping for the 4,605 SF retail building adjacent to the Dillon Bridge, etc.
6.) New Landscaping. Applicant shall provide ¾ inch rock for all new proposed landscape areas. Shade trees shall be implemented along the public R.O.W. Up lighting shall be provided for new trees. Landscape areas shall include a diversity of shrubs including flowering varieties. Additionally, the site landscaping west of the building 4,605 SF building shall extend to landscape the unlandscaped areas adjacent to the existing car wash site. Vines (wired) shall be attached to each CMU wall face of the trash enclosure. Vines wired to the building shall be implemented on the south side of the 4,605 SF building to the satisfaction of the Development Services Director.
21 Item 3.
Resolution No. PC2024-11 EXHIBIT A
7.) Berm Landscaping. The applicant shall provide the City with complete access for entry to the entire south berm area adjacent to the Dillon Bridge for purposes of maintenance and improvements to the berm area. The applicant shall include the berm area enter into project’s Landscape Maintenance Agreement with the City of Coachella for the maintenance of the berm to include weed abatement.
8.) Existing Landscaping. Applicant shall rehabilitate existing landscape areas. Landscape areas shall be rehabilitated along all landscape areas visible from the public R.O.W along Grapefruit Boulevard and Avenue 48. To the satisfaction of the Development Services Director, shade trees shall be implemented along the public R.O.W, and up lighting shall be provided for new trees. Applicant shall replace missing, dead, or decaying landscaping, refresh decorative gravel where sparse, and shall add matching ¾ inch gravel in all landscape areas visible from the public R.O.W along Grapefruit Boulevard and Avenue 48 to the satisfaction of the Code Enforcement Manager and Development Services Director prior to Certificate of Occupancy. The applicant shall submit a final landscape plan for the entire center, to be approved by the Development Services Director, that create consistency across the entire center, which may include large stone in street-adjacent corner areas, and some ¾ inch gravel along common area landscape areas.
9.) General Landscaping. All landscaping, lighting, and irrigation related conditions of approval shall be met to the satisfaction and discretion of the Development Services Director and City Engineer.
10.) Landscape Maintenance Agreement. Applicant shall enter into a Landscape Maintenance Agreement with the City of Coachella for the commercial center landscape areas prior to Certificate of Occupancy for the multi-tenant commercial building.
11.) The pad owner of the proposed 4,695 sq. ft. building shall address any traffic back-up issues that is observed by the City Engineer to regularly conflict with/obstruct on-site circulation from the commercial center to the satisfaction of the City Engineer and Fire Department. Such improvements may include reconfiguration of the queuing drive through lanes or other means that is acceptable to the City Engineer.
12.) Applicant shall submit the updated sign program for stamped approval by the Development Services Department. The applicant shall update the sign program to be complete that includes complete signage details for the center. The site plan on the sign program shall show the repurposed pylon sign and the existing monument price signage on site.
13.) Existing on-site billboard on Grapefruit Blvd shall be removed prior to Certificate of Occupancy.
14.) The construction improvements to the existing abandoned pylon directory sign, pursuant to the approved updated sign program, shall be completed prior to final inspection of new commercial multi-tenant building.
15.) At the discretion of the Development Services Director, the Director may require parking improvement measures if it is determined that the parking impacts/demand from the 22 Item 3.
Resolution No. PC2024-11 EXHIBIT A
businesses at the Coachella Gateway Center do not meet the current on-site or off-site parking supply.
16.) Completion of Landscape Improvements on-site and removal or rehabilitation of the pylon directory sign may satisfy Condition of Approval #4 of PC Resolution PC2023-08.
17.) The owner will be required to consult with the Utilities Manager and Environmental Programs Coordinator regarding water and sewer connections, and utility connection impact fees, and any proposed sewer dump connections.
18.) If it is observed by the City Engineer that the drive through lane capacity is consistently exceeded so as to create a conflict with on-site circulation, the applicant upon notice by the City Engineer shall propose measures to reduce such impacts such as placement of employees to expedite drive through orders, reconfiguration of the existing drive through lane to improve capacity, or other measures that best mitigate such conflicts.
Building Department
19.) Provide access from building to Public Right of Way on Grapefruit Blvd.
20.) Proposed conceptual drawing are missing California Green Building Standard Code Requirements for the following features:
5.106.4.1.1 Short-Term Bicycle Parking
5.106.4.1.2 Long-Term Bicycle Parking
5.106.12 Shade Trees for both (5.106.12.1) Surface Parking Areas, (5.106.12.2) Landscape Areas and (5.106.12.3) Hardscape Areas.
21.) Provide a second egress door at the electrical room.
Utilities
22.) The applicant shall submit water and sewer plans for approval. The proposed project shall be required to connect to the City’s public water and sewer system.
23.) Water & Sewer impact fees to be paid prior to final approval of plans.
24.) The project will require a Water Quality Management Plan (WQMP).
25.) Based on findings of the Source Control application, all modifications shall be completed prior to issuance of a certificate of occupancy.
26.) The applicant shall install above ground “Double Check Detector Assembly” DCDA for fire system to protect water supply from contamination or pollution.
27.) Backflow devices will require Reduced Pressure Principle Device (RP) within 12 inches of water service installed to protect water supply from contamination or pollution.
28.) A separate AMI 4-G metering system for each building shall be installed. 23 Item 3.
Resolution No. PC2024-11 EXHIBIT A
29.) A separate AMI 4-G water service meter for the irrigation system shall be installed.
30.) All facilities will be required to submit a source control survey.
31.) Detailed plumbing and mechanical plans shall be submitted.
32.) The project must implement the State’s drought mandate which prohibits irrigation with potable water outside newly constructed homes and buildings that is not delivered by drip or microspray systems.
33.) If there is an existing sewer connection it will have to be inspected via camera at the project’s expense to determine acceptance.
34.) Water and sewer design engineer shall check in with the Utilities Department for material approvals
35.) All water services shall be copper tubing
36.) Plumbing blueprints depicting water, sanitary, and grease waste line. (Grease waste lines if applicable)
37.) Water and sewer point of connection to the City’s utilities.
38.) Plumbing code fixture schedule with total DFU’s listed.
39.) Complete wastewater discharge survey.
40.) Pretreatment equipment/Sample box: (if applicable) Provide manufacture scarifications and sizing chart.
o Pretreatment Equipment Minimum Requirements:
750 gal minimum
Clean outs and vents before and after pretreatment equipment Sample box immediately downstream of the pretreatment equipment
Multi suite buildings requesting pretreatment installation require separate sewer lateral connection per pretreatment device.
41.) Stormwater runoff must be contained within the property. 24 Item 3.
Resolution No. PC2024-11 EXHIBIT A
Engineering
PRIOR TO APPROVAL OF ENGINEERING PLANS or ISSUANCE OF ENGINEERING PERMITS:
GENERAL:
42.) A focused Traffic Analysis (TA) shall be prepared for the project by an appropriately licensed professional engineer. Prior to the preparation of the TA, the engineer shall submit a scoping letter for the TA for the City Engineer’s approval. The TA shall include but not limited to identification of trip generation, traffic distribution and impact on existing transportation facilities and at time of General Plan build-out, all relevant, ingress and egress movements, lines of sight, queuing analysis, and alignment studies (preliminary signing and striping plan). Applicant shall obtain approval of site access and circulation from the Fire Marshall.
43.) A preliminary soils report shall be prepared for the project by an appropriately licensed professional engineer. At a minimum, the soils report shall provide specific analyses and recommendations for grading, pavement structural sections, and infiltration.
44.) A comprehensive drainage report, prepared by California Registered Civil Engineer, shall be submitted for review and approval by the City Engineer prior to issuance of any permits.
The report shall contain pre- and post-development hydrology maps showing on-site and off-site tributary drainage areas and shall be prepared in accordance with the requirements of the Riverside County Flood Control District. Adequate provisions shall be made to accept and conduct the existing tributary drainage flows around or through the site in a manner which will not adversely affect adjacent or downstream properties. If the design of the project includes a retention basin, it shall be sized to contain the runoff resulting from a 10-year storm event and the runoff from a 100-year storm event shall be contained within basin with shallow ponding (3.5' max.). The basin shall be designed to evacuate a 10-year storm event within 72 hours. The size of the retention basin(s) shall be determined by the hydrology report and be approved by the City Engineer. Retention basin shall be provided with a minimum of 2.00 feet sandy soil if determined to contain silt or clay materials.
Maximum allowable percolation rate for design shall be 10 gal./s.f./day unless otherwise approved by the City Engineer. A percolation test for this site is required to be submitted.
A combination drywell vertical drain field shall be constructed at all points where runoff enters the retention basin. Drywell & vertical drain field design shall be based on soils borings made at the proposed drywell locations after the retention basins have been rough graded. Minimum depth shall be 45-feet. A log that includes sieve analysis for each strata of the borings shall be submitted to the City Engineer for confirmation of depth of the vertical drain fields. Underground retention under the proposed parking area will be considered as an alternative to surface retention subject to the approval of the City Engineer.
45.) Prepare and record necessary drainage easements to implement the project in accordance with drainage law.
46.) A storm water quality management plan shall be prepared for the project by California Registered Civil Engineer in compliance with NPDES and State Water Quality Control 25 Item 3.
Resolution No. PC2024-11 EXHIBIT A
Board regulations. The project shall be designed to specify preferential use of Low Impact Development Best Management Practices that reduce pollutants and runoff volume.
47.) Applicant shall comply with the valley wide NPDES permit requirements including but not limited to submittal of a WQMP for plan review accompanied by a $3,000 plan check deposit for approval including executed maintenance agreement. All unused plan check fees will be refunded to the applicant upon approval of the Final WQMP.
48.) The developer shall submit a Fugitive Dust Control and Erosion Control plan in accordance with Guidelines set forth by CMC and SCAQMD to maintain wind and drainage erosion and dust control for all areas disturbed by grading. Exact method(s) of such control shall be subject to review and approval by the City Engineer. No sediment is to leave the site.
Additional securities, in bond form, in amount of $2,000.00 per acre of gross area, and a one-time cash deposit of $2,000.00 are required to insure compliance with this requirement.
No work may be started on or off site unless the PM-10 plan has been approved, the original plans, and executed dust control agreement, are filed in the engineering department at the City of Coachella.
49.) Applicant shall submit for review and approval by the City Engineer all documents related to any existing and proposed on-site and off-site easements that may affect the development of the site. All easements shall be identified on the engineering plans.
50.) Site access improvements shall be in conformance with the requirements of Title 24 of the California Administrative Code. This shall include access ramps for off-site and on-site streets as required.
51.) Applicant shall obtain approval of site access and circulation from Fire Marshall.
52.) The applicant shall provide necessary utility easements for IID and underground overhead distribution lines within the project boundaries. Applicant shall submit to the City a letter from IID that satisfies this requirement.
53.) The applicant shall pay all necessary plan check, permit and inspection fees. Fees will be determined when plans are submitted to the City Engineering Department for plan check.
ROUGH GRADING:
54.) Prepare and submit rough grading and erosion control plans for the project.
55.) The project’s soils engineer shall certify to the adequacy of the grading plan.
56.) All projects developing one (1) acre or more of total land area, or which are part of a larger phased development that will disturb one acre of land, are required to obtain coverage under the State Water Resources Control Board’s (SWRCB) General Permit for storm water discharges associated with construction activity. Proof of filing a Notice of Intent (NOI) with the SWRCB for coverage under this permit is required. The Waste Discharger’s Identification Number (WDID), issued by the SWRCB, must be shown on the grading plans. The project’s Storm Water Pollution Prevention Plan shall be submitted for the City’s review and approval.
26 Item 3.
Resolution No. PC2024-11 EXHIBIT A
PRECISE GRADING:
57.) A precise grading/improvement plan, prepared by a California Registered Civil Engineer, showing building footprints, pad elevations, finished grades, drainage routes, retaining walls, erosion control, slope easements, and all other pertinent information shall be submitted for review and approval by the City Engineer.
58.) Rough grading shall be certified by the project soils engineer prior to issuance of a permit for precise grading or building construction.
59.) Provide and record a reciprocal use and maintenance agreement to assure common ingress and egress and joint maintenance of all common access, parking areas and drives.
60.) If applicant is planning to build a wall, separate permits shall be required for wall construction. The maximum height of any wall shall be limited to six (6) feet as measured from an average of the ground elevations on either side.
61.) Applicant shall evaluate existing conditions of Storm Drain Structures and retention basins located on the project, and if applicant needs to change the location or size of any Storm Drain structures or retention basins a Drainage Report, prepared by California Registered Civil Engineer, shall be submitted for review and approval by the City Engineer prior to issuance of any permits.
STREET IMPROVEMENTS:
62.) Street improvement plans prepared by a California Registered Civil Engineer shall be submitted for review and approval by the City Engineer. All street improvements including street lights shall be designed and constructed in conformance with City Municipal Code, General Plan, and Standards and Specifications. Street flow line grade shall have a minimum slope of 0.35 %.
63.) Applicant shall construct all off-site and on-site improvements including street pavement, curb, gutter, sidewalk, street trees, perimeter walls, perimeter landscaping and irrigation, storm drain, street lights, and any other incidental works necessary to complete the improvements. Driveways shall conform to City of Coachella standards for commercial driveways with a minimum width of 24.00 feet and curbed radius entrances.
64.) Applicant shall construct and dedicate the following streets and street improvements to conform to the General Plan and/or requirements of Traffic Study. 1) Grapefruit Boulevard- Public Roadway as shown on the RAC and per these comments shall include the following:
a. Dedication of land along Southbound lane within project limits is required. This street is classified as Major Arterial with Bicycle Lanes with 118 feet of right-of-way as per City of Coachella General Plan.
b. Existing street measured at Center line to westerly curb is 46-foot. c. Applicant shall install all sidewalk, curb and gutter transitions to uniformly connect to existing adjacent improvements and coordinate installation and/or relocation of fire hydrants, water 27 Item 3.
Resolution No. PC2024-11 EXHIBIT A
meters, storm drain, wells, streetlights, landscape and all other appurtenances as required to the satisfaction of the City Engineer. d. Applicant shall construct all appurtenant roadway components within project limits such as, but not limited to: sidewalk, ADA ramps, Traffic control striping, legends, Traffic control signs, Street Lights and street name signs to the satisfaction of the City Engineer. e. Applicant shall extend new sidewalk on Grapefruit Blvd. southbound lane from project limits to south side of Dillon Bridge abutment to the satisfaction of the City Engineer.
f. Applicant shall installed hardscape on exiting Grapefruit Blvd. in front of project limits.
g. Applicant shall landscape Dillon Bridge slope that is located at southerly side of project location to the satisfaction of the City Engineer.
SEWER and WATER IMPROVEMENTS:
65.) Sewer & Water Improvement Plans prepared by a California Registered Civil Engineer shall be submitted for engineering plan check and City Engineer approval.
66.) Applicant shall construct all off-site and on-site water improvements and any other incidental works necessary to complete the improvements. Size and location of sewer and water improvements shall be approved by the City Engineer.
PRIOR TO ISSUANCE OF BUILDING PERMITS:
67.) A final soils report, compaction report and rough grading certificate shall be submitted and approved prior to issuance of any building permits.
68.) Prior to issuance of building permits, all required public improvements, including landscaping and lighting of the retention basins, and landscaped areas along the exterior streets, shall be completed or secured with appropriate sureties to the satisfaction of the City Engineer. An engineering final inspection is required. "As-built" plans shall be submitted to and approved by the City Engineer. Prior to acceptance of the improvements by the City, such plans, once approved, shall be given to the city on compact disk in AutoCad format.
All off-site and on-site improvements shall be completed to the satisfaction of the City Engineer prior to acceptance of improvements for maintenance by the City.
69.) The applicant’s Civil Engineer shall field verify and certify that all BMPs are designed, constructed, and functional in accordance with the approved WQMP.
PRIOR TO RELEASE OF OCCUPANCY PERMITS/ACCEPTANCE OF PUBLIC IMPROVEMENTS:
70.) Prior to issuance of certificate of occupancy, all public improvements, including landscaping and lighting of the retention basins, and landscaped areas along the exterior streets, shall be completed to the satisfaction of the City Engineer. An engineering final inspection is required. "As-built" plans shall be submitted to and approved by the City Engineer. Prior to acceptance of the improvements by the City, such plans, once approved, shall be given to the city on compact disk in AutoCad format. All off-site and on-site 28 Item 3.
Resolution No. PC2024-11 EXHIBIT A
improvements shall be completed to the satisfaction of the City Engineer prior to acceptance of improvements for maintenance by the City.
FIRE CONDITIONS
71.) Fire Protection Water Supplies/Fire Flow - Minimum fire flow for the construction of all buildings is required per CFC Appendix B. Prior to building permit issuance for new construction, the applicant shall provide documentation to show a (existing/proposed) water system capable of delivering the required fire flow. Specific design features may increase or decrease the required fire flow.
a. Will Serve Letters from the responsible water purveyor are required prior to a map recordation.
72.) Fire Protection Water Supplies/Hydrants - The minimum number of fire hydrants required, as well as the location and spacing of fire hydrants, shall comply with CFC Appendix C and NFPA 24. Fire hydrants shall be located no more than 400 feet from all portions of the exterior of the building along an approved route on a fire apparatus access road, unless otherwise approved by the Fire Department. Where new water mains are extended along streets where hydrants are not needed for protection of structures, standard fire hydrants shall be provided at spacing not to exceed 1000 feet along streets for transportation hazards.
Fire hydrants shall be at least 40 feet from the building it is serving. A fire hydrant shall be located within 20 to 100 feet of the fire department connection for buildings protected with a fire sprinkler system. The size and number of outlets required for the approved fire hydrants are 4” x 2 ½” x 2 ½” (super hydrant). Reference CFC as amended and NFPA 24.
73.) Fire Department Access - Fire apparatus access roads shall be provided to within 150 feet of all exterior portions of buildings, unless otherwise approved by the Fire Department. Fire apparatus access roads shall have an unobstructed width of not less than 24 feet. Dead-end fire apparatus access roads in excess of 150 feet shall be provided with an approved turn around. The minimum required turning radius of a fire apparatus access road is 38 feet outside radius and 14 feet inside radius. The construction of the fire apparatus access roads shall be all weather and capable of sustaining 75,000 lbs. Unless otherwise approved, the grade of a fire apparatus access road shall not exceed 16 percent and the cross slope shall not exceed 2.5 percent. The angles of approach and departure for fire apparatus access roads shall be a maximum of 6 percent grade change for 25 feet of approach/departure. Reference CFC as amended and Riverside County Fire Department Policies and Standards. a. Fire Lane marking: Identification and marking of fire lanes, including curb details and signage shall be in compliance with Riverside County Fire Department Standards.
74.) Fire Department Building Construction Plan Review - Submittal of construction plans to the Fire Department will be required. Final fire and life safety conditions will be addressed when the Fire Department reviews the plans. These conditions will be based on California Fire Code, California Building Code (CBC), and related codes/standards adopted at the time of construction plan submittal. Reference CFC as amended.
75.) Fire Sprinkler System - All new commercial buildings and structures 3,600 square feet or larger will be required to install a fire sprinkler system. Reference CFC as amended. 29 Item 3.
Resolution No. PC2024-11 EXHIBIT A
76.) Fire Alarm and Detection System - A water flow monitoring system and/or fire alarm system may be required as determined at time of building construction plan review.
Reference CFC as amended.
77.) Traffic Calming Devices - Requests for installation of traffic calming designs/devices on fire apparatus access roads shall be submitted for evaluation purposes, resulting in denial or approval by the Fire Code Official. Reference CFC as amended.
78.) Gate Access - All electronically operated gates shall be provided with Knox key switches and automatic sensors for access. These gates shall be provided with access to gate equipment or another method to open the gate if there is a power failure. (Manual gates shall not be locked unless a Knox padlock or Knox Box containing the key to the lock is installed in an approved location on the approach side of the gate). A pedestrian gate, if used to provide access, shall be a minimum 3 feet wide and provided with a Knox Box/Padlock if locked. Reference CFC as amended.
79.) Water Plans - If fire hydrants are required to be installed, applicant/developer shall furnish the water system fire hydrant plans to the Fire Department for review and approval prior to building permit issuance. Plans shall be signed by a registered civil engineer, and shall confirm hydrant type, location, spacing, and minimum fire flow. Once plans are signed and approved by the local water authority, the originals shall be presented to the Fire Department for review and approval. Reference CFC as amended. 30 Item 3.
CHANDI GROUP USA – GATEWAY PROJECT
CONDITIONS OF APPROVAL FOR CONDITIONAL USE PERMIT NO. 254 (MODIFICATION):
1. This Conditional Use Permit 254 (modification) hereby relinquishes, and replaces in their entirety, the prior approved phasing plan and related conditions of approval, in order to allow two drive-thru restaurants and a single phasing plan for the proposed project. A building permit must be obtained and construction diligently pursued for all phases of the development within 12 months of the effective date, unless a time extension is granted by the Planning Commission.
2. The applicant shall incorporate an outdoor dining area with permanent seating and shade structures to serve the patrons of the drive-thru restaurant pad located at the northern portion of the site, subject to review and approval by the Development Services Director.
3. The applicant shall provide a lighting plan showing adequate illumination of all exterior parking lots, and common areas of the site, subject to review by the Development Services Department.
4. A maximum of 20% of window area may be used for signs. All banners and temporary signs shall be prohibited except as allowed under the City’s sign regulations for special sales and promotional events.
5. All improvements for the car wash tunnel building, subject to Architectural Review No. 12- 07, shall be constructed before the operation of the facility. Operational restrictions of the car wash imposed by Conditional Use Permit No. 256, are incorporated herein as listed below.
a. The car wash facility and vacuum area may operate between the hours of 5 AM to 10 PM daily.
b. An on-site car wash attendant shall be available during regular business hours of the car wash.
c. Wash water from the car wash must be recycled and cannot be discharged to the sewer system.
d. The car wash and vacuum area shall be operated as an automated car wash and maintained regularly, free of trash and debris.
6. Trash receptacles shall be provided in areas convenient for customers and shall be emptied daily.
31 Item 3.
CONDITIONS OF APPROVAL FOR ARCHITECTURAL REVIEW 12-07 (MODIFICATION):
1. This Architectural Review 12-07 (modification) relinquishes, and replaces in their entirety, the prior conditions of approval for Architectural Review No12-07 and allows a modified placement of the car wash tunnel, two drive-thru restaurants and an augmented service station canopy and new mini-market building. A building permit must be obtained and construction diligently pursued for all phases of the project within 12 months of the effective date, unless a time extension is granted by the Planning Commission.
2. The construction shall be in conformance with the plans submitted and conditions imposed herein for Architectural Review No. 12-07. This shall include the materials and colors as shown on the approved plans. The applicant or successor in interest shall submit detailed plans to the Building Division for review and approval.
3. A comprehensive sign program shall be submitted for review by the Planning Commission prior to issuance of a Certificate of Occupancy.
4. The project shall comply with all applicable codes, laws and regulations, regardless of whether they are listed in these conditions.
5. The applicant shall pay all applicable school impact fees to the Coachella Valley Unified School District prior to the issuance of building permit.
6. Additional cabling will be required to provide electric service from Imperial Irrigation District. Existing cable will require upgrading to include switches and other subsurface structures.
Grading and Drainage
7. A preliminary geological and soils engineering investigation shall be conducted by a registered soils engineer, and a report submitted for review with the grading plan and shall include pavement recommendations (on-site & off-site). The report recommendations shall be incorporated into the grading plan design prior to grading plan approval. The soils engineer and/or the engineering geologist shall certify to the adequacy of the grading plan.
8. A grading plan, prepared by a California Registered Civil Engineer, shall be submitted for review and approval by the City Engineer prior to issuance of any permits. A final soils report, compaction report and rough grading certificate shall be submitted and approved prior to issuance of any building permits.
9. A Drainage Report, prepared by California Registered Civil Engineer, shall be submitted for review and approval by the City Engineer prior to issuance of any permits. 100% of the post development runoff shall be retained onsite. The report shall contain a Hydrology Map showing on-site and off-site tributary drainage areas and shall be prepared in accordance with the requirements of the Riverside County Flood Control District. Adequate provisions 32 Item 3.
shall be made to accept and conduct the existing tributary drainage flows around or through the site in a manner which will not adversely affect adjacent or downstream properties. If the design of the project includes a retention basin, it shall be sized to contain the runoff resulting from a 10-year storm event and the runoff from a 100-year storm event shall be contained within basin with shallow ponding (2.5' max.) and within the public streets. The basin shall be designed to evacuate a 10-year storm event within 72 hours. The size of the detention basin(s) shall be determined by the hydrology report and be approved by the City Engineer. Detention basin shall be provided with a minimum of 2.00 feet sandy soil if determined to contain silt or clay materials. Maximum allowable percolation rate for design shall be 10 gal./s.f./day unless otherwise approved by the City Engineer. A percolation test for this site is required to be submitted. A combination drywell vertical drain field shall be constructed at all points where runoff enters the retention basin.
Drywell & vertical drain field design shall be based on soils borings made at the proposed drywell locations after the retention basins have been rough graded. Minimum depth of borings shall be 45-feet. A log that includes sieve analysis for each strata of the borings shall be submitted to the City Engineer for confirmation of depth of the vertical drain fields.
10. Site access improvements shall be in conformance with the requirements of Title 24 of the California Administrative Code. This shall include the replacement or installation of access ramps for off-site and on-site streets as required.
11. Applicant shall obtain approval of site access and circulation from Fire Marshall and trash disposal company.
12. Applicant shall construct all off-site and on-site improvements including street pavement, curb, gutter, sidewalk, street trees, perimeter walls, perimeter landscaping and irrigation, storm drain, street lights, and any other incidental works necessary to complete the improvements. Driveways shall be in accordance with City standard drawing S-18.
Damaged curb, gutter and sidewalk shall be replaced as required.
Sewer and Water Improvements
13. Sewer & Water Improvement Plans prepared by a California Registered Civil Engineer shall be submitted for Engineering plan check and City Engineer approval.
14. Applicant shall construct all off-site and on-site water improvements and any other incidental works necessary to complete the improvements. Size and location of sewer and water improvements shall be approved by the City Engineer.
15. Minimum depth of sewer manholes shall be 5.00 feet (top of pipe to top of rim). Size and slope of sewer mains shall be approved by the City Engineer. The minimum slope for sewer main shall be as follows: (1) 8" - 0.33 percent, (2) 10" - 0.24 percent, (3) 12" - 0.19 percent, (4) 15", 18", 24", 27" & 33" 0.14 percent.
33 Item 3.
16. Applicant shall connect to the existing sewer main in the relocated 48 grade separation via six inch laterals with a clean out at the property line. On site sewer shall be constructed according to City Standards and shall be subject to inspection by the City.
17. Applicant shall connect to the existing 12 inch water main in Grapefruit Blvd. and the 48 Grade separation as required to provide adequate pressure to serve both domestic and fire services, including all fire hydrants, valves, 4 inch blow offs, fittings and, any other incidental works necessary to complete the improvements according to City standards.
18. Applicant shall provide the City with bonding for all off-site improvements, such bonding amounts shall be based on an Engineer’s Estimate provided by the Applicant.
General
19. A composite utility plan showing all utilities shall be submitted for review and approval by the City Engineer. The applicant shall construct all other utilities such as gas, telephone, television cable, electrical, and any other incidental works necessary to complete the utility improvements. All utilities will be constructed underground and extended to the tract boundary. Existing overhead utilities within the limit of construction shall be relocated underground and behind sidewalk. Street improvement plans shall not be approved until this plan is submitted and deemed substantially complete and correct.
20. The developer shall submit a Fugitive Dust Control and Erosion Control plan in accordance with Guidelines set forth by CMC and SCAQMD to maintain wind and drainage erosion and dust control for all areas disturbed by grading. Exact method(s) of such control shall be subject to review and approval by the City Engineer. No sediment is to leave the site.
Additional securities, in bond form, in amount of $2,000.00 per acre of gross area, and a one-time cash deposit of $2,000.00 are required to insure compliance with this requirement.
No work may be started on or off site unless the PM-10 plan has been approved, the original plans, and executed dust control agreement, are filed in the engineering department at the City of Coachella.
21. The applicant shall pay all necessary plan check, permit and inspection fees. Fees will be determined when plans are submitted to the City Engineering Department for plan check.
22. The applicant shall comply with the valley wide NPDES permit requirements including but not limited to submittal of a Preliminary WQMP and a Final WQMP for final approval including executed maintenance agreement.
Completion
23. "As-built" plans or composite utility plans shall be submitted to and approved by the City Engineer prior to acceptance of the improvements by the City. All off-site and on-site improvements shall be completed to the satisfaction of the City Engineer prior to acceptance of improvements by the City.
34 Item 3.
24. Submit plumbing plans for facility. Facility will need oil/grease interceptors and oil/water clarifiers and sample wyes installed.
25. Install above ground “double check detector assembly” DCDA for fire system to protect water supply from contamination or pollution
26. Backflow devices shall be installed and will require reduced pressure principle device (RP) installed to protect water supply from contamination or pollution.
27. Submit a site plan for stormwater including basin retention plan
28. Submit a spill containment and response plan to prevent non-stormwater spills to storm system; spill response kit to be maintained in the immediate area along with a record’s log to document occurrences of spill events.
29. Building height shall not exceed thirty (35) feet.
30. Separate permits shall be required for wall or fence construction. The maximum height of any wall shall be limited to eight (8) feet as measured from an average of the ground elevations on either side.
31. Concrete decorative paving shall be installed at the full driveway width, and with a depth of 20 feet at each driveway entrance to the project site.
32. The applicant shall install and maintain all landscaping and irrigation within the landscape parkway and the sidewalk on frontage areas along Grapefruit Blvd, Dillon Road, and Avenue 48 and shall assume landscape maintenance responsibilities of all parkway areas through a maintenance agreement with the City. The owner may enter into an agreement with the City for landscape installation and maintenance agreement on the south berm area adjacent to the Dillon Bridge prior to issuance of a building permit.
33. The developer must submit a landscape plan following the guidelines of the adopted Landscape Development Guidelines and Specifications prepared by VC2 Group dated September 2000. Landscaping shall also conform to Chapter 17.54 of the Coachella Municipal Code.
34. The Development Services Department may request minor substitutions of plant materials or request additional sizing or quantity of materials during plan check.
35. The landscape and irrigation plan shall show compliance with the following development standards for the parking areas.
a) Where any parking area abuts a street there shall be a minimum setback of ten (10) feet from the public right of way, which shall be fully landscaped and irrigated unless a greater setback is required by any other provision of the title. 35 Item 3.
b) Internal landscaping equal to a minimum of five percent (5%) of the parking area and driveway area is required and shall be established throughout the parking area. The landscape plan shall include common and botanical names and include size of each species. The applicant shall submit an irrigation plan for review and approval by Directors of Community Development and Engineering. Landscaping and automatic irrigation system must be completed prior to occupancy of the first tenant space. c) All landscape planter beds in interior parking areas shall be not less than five (5) feet in width and bordered by a concrete curb not less than six (6) inches nor more than eight (8) inches in height adjacent to the parking surface.
d) Where a drive aisle abuts the side of a parking space a landscaped planter shall separate the parking space from the drive aisle. The masonry wall proposed to screen the drivethru aisle along the Avenue 48 and Dillon Road frontage shall be a minimum of four feet in height and vertical shrubs shall be used to further screen the drive-thru aisle from view to the street.
e) At least one (1) fifteen (15) gallon tree shall be provided within the parking area for every ten (10) parking spaces, with size, height and species acceptable to staff. f) All internal landscape planters shall have permanent and automatic sprinklers or drip irrigation systems.
36. Mature Date Palm trees shall be planted with a minimum trunk height of 12 feet.
37. All roof mounted mechanical equipment shall be obscured from view by parapet walls that exceed the height of the equipment.
38. All new lighting shall be low pressure sodium and shall be directed away from adjacent properties. Prior to issuance of a building permit, a lighting plan shall be required to be submitted for review and approval by the Planning Director showing lighting standards, locations, and light levels throughout the project site. Lighting shall also be provided along all walkways between, building #1, car wash building, and Arco AM/PM building.
Landscape accent lighting shall be used in all perimeter landscape areas.
39. A minimum of five (5) trash enclosures shall be constructed; this shall include doors and a concrete foundation within the enclosure, and a concrete apron for the area in the swing of the gates, and include space for recycling containers. Trash enclosures shall be compatible with the architecture of the project. These bins shall be of a size and design that is acceptable to Burrtec. The trash enclosures shall be maintained in a clean and sanitary manner.
40. The applicant shall submit plans that demonstrate existing billboard sign will not interfere with on-site vehicle circulation.
41. Tenant infill improvement plans shall be required to be approved by the Planning, Building and Fire Departments prior to the issuance of building permits. All buildings shall be subject 36 Item 3.
to conformance with applicable building codes including the Uniform Building and Plumbing Codes.
Fire Department
42. Provide or show there exists a water system capable of delivering a fire flow 1500 gallons per minute for a 2 hours duration at 20 psi residual operating pressure, which must be available before any combustible material is placed on the construction site. (Fire flow may be adjusted, based on building use, sprinkler installation, and/or building size)
43. Approved accessible on-site fire hydrants shall be located not to exceed 500 feet apart in any direction. Any portion of the facility or of an exterior wall of the first story of the building shall not be located more than 150 feet from fire apparatus as measured by an approved route around the complex, exterior of the facility or building. No portion of a building shall be further than 400 feet from a fire hydrant. Fire hydrants shall provide the required fire flow.
44. (If an onsite fire hydrant is necessary) Prior to building plan approval and construction, applicant/developer shall furnish two copies of the water system fire hydrant plans to Fire Department for review and approval. Plans shall be signed by a registered civil engineer, and shall confirm hydrant type, location, spacing, and minimum fire flow. Once plans are signed and approved by the local water authority, the originals shall be presented to the Fire Department for review and approval.
45. Prior to issuance of building permits, the water system for fire protection must be provided as approved by the Fire Department and the local water authority. If a water system already exists; a letter from the local water District, verifying an adequate water flow, will need to be submitted for review.
46. Blue dot retro-reflectors pavement markers on private, public streets and driveways to indicated location of the fire hydrant shall be per Standard 06-11 if an onsite fire hydrant is necessary.
47. Driveway loops, fire apparatus access lanes and entrance curb radius should be designed to adequately allow access of emergency fire vehicles. The applicant or developer shall include in the building plans the required fire lanes and include the appropriate lane printing and/or signage
48. Approved fire apparatus lanes shall be provided for every commercial/ public use facility, building or portion of a building. All access lanes shall extend to within 150 feet of all portions of the buildings.
49. Access lane shall be constructed with a surface so as to provide all weather driving capabilities.
50. An approved Fire Department access key lock box (Minimum Knox Box 3200 series model) shall be installed next to the approved Fire Department access door to the building. If the 37 Item 3.
buildings are protected with an alarm system, the lock box shall be required to have tampered monitoring. Required order forms and installation standards may be obtained at the Fire Department.
51. Display street numbers in a prominent location on the address side of building(s) and/or rear access if applicable. Numbers and letters shall be a minimum of 12” in height for building(s) up to 25’ in height. In complexes with alpha designations, letter size must match numbers.
All addressing must be legible, of a contrasting color, and adequately illuminated to be visible from street at all hours.
52. Install a complete commercial fire sprinkler system (per NFPA 13 1999 Edition). Fire sprinkler system(s) with pipe sizes in excess of 4” in diameter will require the project Structural Engineer to certify with a “wet signature”, that the structural system is designed to support the seismic and gravity loads to support the additional weight of the sprinkler system.
All fire sprinkler risers shall be protected from any physical damage. The PIV and FCD shall be located to the front, within 25 to 50 feet of hydrant, and a minimum of 25 feet from the building(s). Sprinkler riser room must have indicating exterior and/or interior door signs. A C-16 licensed contractor must submit plans, along with current permit fees, to the Fire Department for review and approval prior to installation.
53. Install an alarm monitoring system for fire sprinkler system(s) with 20 or more heads A C-10 licensed contractor must submit plans along with the current permit fees to the Fire Department for review and approval prior to installation.
54. Install a portable fire extinguisher, with a minimum rating of 2A-10BC, for every 3,000 sq. ft. and/or 75 feet of travel distance. Fire extinguishers shall be mounted 3.5 to 5 ft. above finished floor, measured to the top of the extinguisher. Where not readily visible, signs shall be posted above all extinguishers to indicate their locations. Extinguishers must have current CSFM service tags affixed.
55. Where applicable; a UL 300 hood/duct fire extinguishing system must be installed over the cooking equipment. A C-16 licensed contractor must submit plans, along with the current permit fee, to the Fire Department for review and approval prior to installation.
56. No hazardous materials shall be stored and/or used within the building, which exceeds quantities listed in 2007 California Building Code. No class I, II or IIIA of combustible/flammable liquid shall be used in any amount in the building.
57. Exit designs, exit signs, door hardware, exit markers, exit doors, and exit path marking shall be installed per the 2007 California Building Code.
58. Electrical room doors, FAC, fire riser, roof access if applicable shall be labeled as per use.
59. Access shall be provided to all mechanical equipment located on the roof as per 2007 California Mechanical Code.
38 Item 3.
60. Air handling systems supplying air in excess of 2000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shut off as per 2007 California Mechanical Code.
61. The Proposed project may have a cumulative adverse impact on the Fire Department’s ability to provide an acceptable level of service. These impacts include an increase in the number of emergency and public service calls due to the increased presence of structures, traffic and population. The project proponents/developers will be expected to provide for a proportional mitigation to these impacts via capital improvements and/or impact fees.
62. The project will need to comply with the City’s Industrial Pretreatment Program. All proposed discharges that are generated as a part of operations (garage, car washing) must meet discharge requirements.
63. The applicant is encouraged utilize energy efficient design in the construction of the proposed building to address issues such as water conservation/reuse, ventilation, insulation, building materials, energy production (solar, wind), and site planning.
64. The applicant shall construct a bus shelter or dedicate right-of-way for a future shelter at the Sunline transit stop on Grapefruit Boulevard. Bus shelter plans or plans for the dedication of right-of-way shall be submitted by the applicant for review by the Sunline Transit Agency, City Engineer and the Development Services Director.
65. The applicant shall install bicycle racks in accessible areas to each building, excluding the car wash service building.
66. A path of travel shall be provided with access to all tenant spaces from Grapefruit Blvd, Dillon Road and Avenue 48.
67. The project shall comply with the City of Coachella Art in Public Places Program by the dedication of an approved artwork at the project site, payment of an in-lieu fee to the Public Arts Fund, the posting of a financial security or the donation of approved artwork in conformance with The Ordinance No. 1034.
68. The applicant shall defend, indemnify and hold harmless the City and its officers, agents and employees from any claim, action, or proceedings against the City or its officers, agents or employees. The applicant shall further defend, indemnify and hold harmless the City, its officers, agents and employees from any damages, liabilities, claims, suits, or causes of auction of any kind or form, whether for personal injury, death or property damage, arising out of or in connection with the activities or performance of the applicant, its agents, employees, licensees, contractors, subcontractors or independent contractors, pursuant to the approval issues by the City. The applicant shall submit an indemnification agreement in a form acceptable to the City Attorney.
39 Item 3.
OF SHEETS SHEET 01
INC. Black Gold Engineering
Engineering ● Land Survey ● Design
42270 Spectrum Street, Indio, California, 92203
PH: 760-396-9260 FX: 760-396-5245
PREPARED BY: DATE REVISION NO. USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLYCONDITIONAL USE PERMIT MODIFICATION FOR:
48151 GRAPEFRUIT BOULEVARD
COACHELLA, CA 92236 C 68972 EXP. 12/31/25 REGISTERED PROFESIONAL ENGINEER STATE OF CALIFORNIA MARK H. CHAP ELL C I V I L
COACHELLA GATEWAY
SHOPPING CENTERRETAIL BUILDING COACHELLA GATEWAY SHOPPING CENTER EXPANSION CL AVENUE 48 CL CL GRAPEFRUIT BOULEVARD (STATE HIGHWAY 111) CL FREDERICK STREET (DILLON ROAD OVERPASS) CL (DILLON ROAD OVERPASS) LEGAL DESCRIPTION: EXISTING LAND USE: PROPOSED LAND USE: SITE ADDRESS: EXISTING ZONING: APPLICANT: PROPERTY OWNER: FLOOD HAZARD ZONE: ASSESSOR'S PARCEL NO: LEGEND: ABBREVIATIONS: C1.0 UTILITIES: PROJECT SITE AVENUE 48 INDIO BLVD. DILLON RD GRAPEFRUIT BLVD. VICINITY MAP P:\121 - Coachella-GSC 48th\03 - CIVIL\DWGS\CUP MODIFICATION_STARBUCKS\STARBUCKS_COACHELLA GSC_GP_4-18-24.dwg, Layout1, 4/18/2024 3:27:34 PM 40 Item 3.
321 54 98
11 10
12 R F R F 76 HP
VAN
ACCESSIBLE NO
PARKING VAN ACCESSIBLE NO PARKING VAN ACCESSIBLE NO PARKING NO
PARKING
EV
CHARGING ONLY
EV
CHARGING ONLY 77-899 WOLF RD. PH. (760) 777-9131
FAX (760) 777-9132
PALM DESERT, CA
LIC# 2754, EXP 04/30/26 92211 HERMANN RIVERSIDE COUNTY, CA COACHELLA GATEWAY EXPANSION DESIGN GROUP SUITE 102 PRELIMINARY LANDSCAPE PLAN 41 Item 3.
VAN
ACCESSIBLE
NO
PARKING
VAN
ACCESSIBLE
NO
PARKING
VAN
ACCESSIBLE
NO
PARKING
NO
PARKING
EV
CHARGING ONLY
EV
CHARGING ONLY
1 2
3 4
5 8
9 10
11 12
R F R
F
6 7
HP PROJECT NUMBER DATE 121-04 4/18/2024
48151 Grapefruit Blvd.
Coachella, CA 92236
CONDITIONAL USE PERMIT AMENDMENT FOR
Coachella Gateway
Retail Building
NO.
- REVISION
- DATE-
LACK OLD NGINEERING
INC
B G E
Civil Engineering - Land Surveying - Design
42270 Spectrum Street, Indio, CA 92203
Ph: (760) 396-9260 - Fx: (760) 396-5245 USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLY A0.1 ARCHITECTURAL SITE PLAN SITE PLAN SCALE: 1" = 20.00' NOR
TH PROJECT DESCRIPTION: 1. NEW 4,605.50 SQ. FT. RETAIL SHELL BUILDING CONSISTING OF 2 RETAIL TENANTS AND 1 QSR TENANT. 2. ADDITION OF TRASH ENCLOSURE. 3. ADDITION OF DOUBLE DRIVE-THRU ENTRANCE PROJECT ADDRESS: 48151 GRAPEFRUIT BLVD. COACHELLA CA 92236 APN: 603-220-057 ZONE: CG - GENERAL COMMERCIAL LOT AREA: 0.77 ACRES (33,541 SQ. FT.) LANDSCAPED AREA: 6,978 SQ. FT. LANDSCAPE COVERAGE: 20.8 PERCENT RETAIL BUILDING AREA SUMMARY: TENANT A: 1,519.75 SQ. FT. TENANT B: 1,493.00 SQ. FT. TENANT C (PROPOSED STARBUCKS): 1,407.25 SQ. FT. CUSTOMER AREA = 107.50 SQ. FT. NON-CUSTOMER AREA = 1,299.75 SQ. FT. ELECTRICAL ROOM: 140.00 SQ. FT. FIRE RISER ROOM: 45.50 SQ. FT. PARKING ANALYSIS: (OFF STREET PARKING) QSR CUSTOMER AREA (1 STALL/45 SQ. FT.): 107.50/45 = 3 RETAIL AREA (1 STALLS/200 SQ. FT.): 4498/200 = 23 PARKING REQUIRED: 26 SPACES PARKING PROVIDED: 26 SPACES ADA PARKING: (PER 2022 CBC 11B-208.2) REQUIRED - 2 SPACES PROVIDED - 2 SPACES EV SPACES: (PER 2022 CAL GREEN 5.106.5.3) EVCS REQUIRED - 6 EVSE REQUIRED - 2 EVCS PROVIDED - 2 LEVEL 2 EVSE PROVIDED - 1 DIRECT CURRENT FAST CHARGING EVSE PROVIDED - 1 NOTE: THE INSTALLATION OF EACH DCFC EVSE SHALL BE PERMITTED TO REDUCE THE MINIMUM NUMBER OF REQUIRED EV CAPABLE SPACES WITHOUT EVSE BY FIVE AND REDUCE PROPORTIONALLY THE REQUIRED ELECTRICAL LOAD CAPACITY TO THE SERVICE PANEL OR SUBPANEL. (2022 CAL GREEN SECTION 5.106.5.3.2) BICYCLE SPACES REQUIRED: 5% OF ADDITIONAL OFF STREET PARKING (5%)(26) = 2 SPACES 2 SHORT TERM BICYCLE SPACES PROVIDED. 2 LONG TERM BICYCLE SPACES PROVIDED. SITE DATA EX. 125' CARWASH TUNNEL
(NOT A PART)
EX. C-STORE
(NOT A PART)
EX. BURGER KING
(NOT A PART)
EX. 10 MPD FUEL CANOPY
(NOT A PART)
EX. PAD FOR
FUTURE RESTAURANT
(NOT A PART)
PROPOSED
RETAIL BUILDING
4,605 SQ. FT. (3 TENANTS)
42 Item 3.
VAN
ACCESSIBLE
NO
PARKING
VAN
ACCESSIBLE
NO
PARKING
NO
PARKING
EV
CHARGING ONLY
EV
CHARGING ONLY
7 1
7 7
8 8
8 8
8 8
9 9 13 10 10 10 10 10 10 10 10 11 11 12 11 13 13 13 13 13 10 10 10 6 6
6 13
9 10 15
9 8
8 13 14 14
6 13
1 2
3 4
5 8
9 10
11 12
R
F
R
F
6 7
HP
2 4
4 4
5 5
7 7 10 13
7 7
7 14 14 14 16 17 17 18 19 2020 21 21 22 23 24 24 24 24 24 19'-0"
28'-0"
19'-0"
12'-6" 15
9'-0"
12'-0"
3'-0"
12'-0"
10'-0"
26'-0"
5'-6"
19'-0"
28'-0"
19'-0"
13'-0"
19'-0"
9'-0"
9'-0"
9'-0"
26'-11
3 4
"
9'-0"
12'-0"
15'-6"
21'-8
1 16
"
19'-7
15 16
"
12'-0"
56'-6"
84'-6"
8'-0"
1'-0"
31'-11
15 16
" PROJECT NUMBER DATE 121-04 4/18/2024
48151 Grapefruit Blvd.
Coachella, CA 92236
CONDITIONAL USE PERMIT AMENDMENT FOR
Coachella Gateway
Retail Building
NO.
- REVISION
- DATE-
LACK OLD NGINEERING
INC
B G E
Civil Engineering - Land Surveying - Design
42270 Spectrum Street, Indio, CA 92203
Ph: (760) 396-9260 - Fx: (760) 396-5245 USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLY A0.2 ENLARGED SITE PLAN ENLARGED SITE PLAN SCALE: 1" = 10.00' NOR
TH (E) DRIVEWAY APPROACH (E) SIDEWALK. (E) CURBED RAMP. (E) PARKING LOT PAVING. (E) LANDSCAPED AREA. (E) PARKING LOT LIGHTS CONCRETE SIDEWALK PER CIVIL PLANS CONCRETE PAVING PER CIVIL PLANS PARKING LOT PAVING PER CIVIL PLANS LANDSCAPED AREA ACCESSIBLE PARKING STALLS TRASH ENCLOSURE PARKING LOT LIGHTS SET BEHIND CURB MINIMUM OF 2'-6" CURB TO BE PAINTED RED W/ SIGNAGE "NO PARKING, FIRE LANE" BIKE RACK/BIKE LOCKER GREASE INTERCEPTOR EV CAPABLE SPACE VAN ACCESSIBLE EV CHARGING SPACE WITH LEVEL 2 EV SUPPLY EQUIPMENT EV SPACE WITH DIRECT CURRENT FAST CHARGING SUPPLY EQUIPMENT AC BURM PER CIVIL PLANS. 8" WIDE WHITE CHANNELIZING LINE PER CIVIL PLANS. FIRE RISER ROOM ELECTRICAL ROOM ACCESSIBLE PEDESTRIAN PATH STRIPING 2346SITE KEYNOTES NO. DESCRIPTION789101112131415161719202122231185
TENANT B
TENANT A
TENANT C
EX. C-STORE
(NOT A PART)
EX. 10 MPD FUEL CANOPY
(NOT A PART)
EX. PAD FOR
FUTURE RESTAURANT
(NOT A PART) 24 43
Item 3.
MANUFACTURER: DUNN EDWARDS COLOR: MISSION TRAIL NOTES: EPOXY FINISH TO BE APPLIED TO METAL ROOF (15 YEAR FILM COATING & 5 YEAR FADE WARRANTY MIN.) MANUFACTURER: ORCO BLOCK PRODUCT: SPLIT FACE BLOCK COLOR: TAN MW EXTERIOR MATERIAL /FINISH SCHEDULE PX-1 PX-2 1. THE INTERIOR WALL SURFACES OF THE TRASH ENCLOSURE ARE TO BE SMOOTH, SEALED AND WASHABLE. APPLY ONE COAT EPOXY FILLER/SEALER AND ONE COAT GLOSS POLYURETHANE. 2. CMU TO BE FINISHED PX-2. EXTERIOR FINISH NOTES 6'-0" 2'-0"
1'-3" 4" STEEL POST (TYP.) CORRUGATED METAL DOORS WITH DECORATIVE TOP. 8X8X16 CMU WALL8'-0" CORRUGATED METAL DOORS WITH DECORATIVE TOP. 4" STEEL POST. HEAVY DUTY GATE HINGES, 3 PER DOOR. SEE DETAIL 05/A0.5 HEAVY DUTY CANE BOLTS. SEE DETAIL 04/A0.5 CORRUGATED METAL DOORS WITH DECORATIVE TOP. 8X8X16 CMU WALL 4" STEEL POST. 5'-6" 2'-0" 1'-3" METAL ROOF. 2" STEEL HORIZONTAL RAILS 8X8X16 CMU WALL 4x4 ROOF DRAIN 5" 4" 4" 1" GAP (TYP.)
2'-412" 2'-412"
7" 7'-0" 8X8X16 CMU WALL 4" STEEL POST.
5'-6" 2'-0" 1'-3" METAL ROOF. 2" STEEL HORIZONTAL RAILS 4" STEEL POST. 8X8X16 CMU WALL 4" STEEL POST. 5'-6" 2'-0" 1'-3" METAL ROOF. 2" STEEL HORIZONTAL RAILS 2" STEEL POST (TYP.) 2'-1
13 16" 2'-1
13 16"
6'-712" 0"
4" 512" HEAVY DUTY GATE HINGES, 3 PER DOOR. SEE DETAIL 05/A0.5 4" STEEL POST. METAL ROOF. 8X8X16 CMU WALL 4" STEEL POST (TYP.) 4" STEEL POST.4" A0.4 TRASH ENCLOSURE ELEVATIONS TRASH ENCLOSURE ELEVATION 01 SCALE: 1/2" = 1'-0" TRASH ENCLOSURE ELEVATION 02 SCALE: 1/2" = 1'-0" TRASH ENCLOSURE ELEVATION 03 SCALE: 1/2" = 1'-0" TRASH ENCLOSURE ELEVATION 04 SCALE: 1/2" = 1'-0" PROJECT NUMBER DATE 121-04 4/18/2024 48151 Grapefruit Blvd.
Coachella, CA 92236
CONDITIONAL USE PERMIT AMENDMENT FOR
Coachella Gateway
Retail Building
NO. - REVISION - DATE -
LACK OLD NGINEERING
INC B G E
Civil Engineering - Land Surveying - Design
42270 Spectrum Street, Indio, CA 92203
Ph: (760) 396-9260 - Fx: (760) 396-5245 USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLY 44 Item 3.
23'-0" TOP OF PARAPET 17'-0" TOP OF PARAPET 10'-0" TOP OF STOREFRONT BOTTOM OF CANOPY 0'-0" TOP OF SLAB 0'-0" TOP OF SLAB 11'-0" TOP OF STOREFRONT BOTTOM OF CANOPY 20'-0" TOP OF PARAPET 21'-0" TOP OF PARAPET M-1 P-1 M-1 P-1 P-1 M-1 P-1 P-3 ST-2 P-3 CB-1 ST-1 P-2 ST-1 P-2 ST-2 P-1 CB-3 P-2 CB-3 P-1 ST-1 P-5 C-1 C-1 C-1 ST-2 P-3 ST-1 P-4 ST-2 P-1 ST-1 P-5 ST-2 P-1 CB-3 P-2 CB-2 P-2 CB-2 P-2 ST-1 P-1 48151 20'-0" TOP OF PARAPET 0'-0" TOP OF SLAB 0'-0" TOP OF SLAB 10'-0" TOP OF STOREFRONT BOTTOM OF CANOPY 23'-0" TOP OF PARAPET M-1 P-1 M-1 P-1 CB-3 P-2 CB-3 P-1 CB-3 P-2 CB-2 P-2 CB-2 P-2 CB-1 ST-2 P-3 ST-2 P-3 C-1 ST-1 P-1 48151 A1.2 EXTERIOR BUILDING ELEVATIONS PROJECT NUMBER DATE 121-04 4/16/2024 48151 Grapefruit Blvd.
Coachella, CA 92236
CONDITIONAL USE PERMIT AMENDMENT FOR
Coachella Gateway
Retail Building
NO.
- REVISION
- DATE-
LACK OLD NGINEERING
INC
B G E
Civil Engineering - Land Surveying - Design
42270 Spectrum Street, Indio, CA 92203
Ph: (760) 396-9260 - Fx: (760) 396-5245 USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLY BUILDING ELEVATION 1 SCALE: 1/4" = 1'-0" BUILDING ELEVATION 2 SCALE: 1/4" = 1'-0" FINISH SCHEDULE FINISH DESCRIPTION P PAINT & STAIN P-2 P-1 P-3 MANUFACTURER: DUNN EDWARDS COLOR: DE6223 "MISSION TRAIL" MANUFACTURER: DUNN EDWARDS COLOR: DE6192 "NOMADIC TAUPE" MANUFACTURER: DUNN EDWARDS COLOR: DE6193 "BAMBOO SCREEN" EXTERIOR FINISHES PRODUCT: 3-COAT STUCCO SYSTEM FINISH: FINE SAND FLOAT FINISH ST-1 CB-1 P-4 MANUFACTURER: DUNN EDWARDS COLOR: DE5375 "SANTA FE TAN" P-5 MANUFACTURER: DUNN EDWARDS COLOR: DE5272 "SEDONA AT SUNSET" INTERIOR FINISHES GB-1 5/8" TYPE X, GYPSUM BOARD. LEVEL 5 FINISH PLY-1 PLYWOOD, REFER TO STRUCTURAL PLANS M-1 MANUFACTURER: PRODUCT/FINISH: METAL FLASHING / TRIM PRODUCT: METAL CANOPY FINISH: CLEAR ANODIZED ALUMINUM C-1 PRODUCT: ARCHITECTURAL WALL PANEL CEMENT BOARD MANUFACTURER: NICHIHA MODEL: VINTAGEWOOD "REDWOOD" PRODUCT: 3-COAT STUCCO SYSTEM FINISH: COMBED FINISH ST-2 CB-2 PRODUCT: ARCHITECTURAL WALL PANEL CEMENT BOARD MANUFACTURER: NICHIHA MODEL: ILLUMINATION "CUSTOM" CB-3 PRODUCT: ARCHITECTURAL WALL PANEL CEMENT BOARD MANUFACTURER: NICHIHA MODEL: RIBBED "CUSTOM" 45 Item 3.
20'-0" TOP OF PARAPET 0'-0" TOP OF SLAB 21'-0" TOP OF PARAPET 0'-0" TOP OF SLAB 10'-0" TOP OF STOREFRONT BOTTOM OF CANOPY 23'-0" TOP OF PARAPET 17'-0" TOP OF PARAPET P-1 M-1 P-1 CB-3 P-2 CB-3 P-1 CB-3 P-2 CB-2 P-2 CB-2 P-2 ST-1 P-1 ST-2 P-3 ST-2 P-3 C-1 23'-0" TOP OF PARAPET 10'-0" TOP OF STOREFRONT BOTTOM OF CANOPY 0'-0" TOP OF SLAB 0'-0" TOP OF SLAB 20'-0" TOP OF PARAPET ST-1 P-5 ST-2 P-1 ST-1 P-5 ST-2 P-1 M-1 P-1 ST-1 P-1 M-1 P-1 CB-3 P-2 CB-3 P-1 CB-3 P-2 CB-2 P-2 CB-2 P-2 C-1 A1.3 EXTERIOR BUILDING ELEVATIONS PROJECT NUMBER DATE 121-04 4/16/2024 48151 Grapefruit Blvd.
Coachella, CA 92236
CONDITIONAL USE PERMIT AMENDMENT FOR
Coachella Gateway
Retail Building
NO.
- REVISION
- DATE-
LACK OLD NGINEERING
INC
B G E
Civil Engineering - Land Surveying - Design
42270 Spectrum Street, Indio, CA 92203
Ph: (760) 396-9260 - Fx: (760) 396-5245 USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLY BUILDING ELEVATION 3 SCALE: 1/4" = 1'-0" BUILDING ELEVATION 4 SCALE: 1/4" = 1'-0" FINISH SCHEDULE FINISH DESCRIPTION P PAINT & STAIN P-2 P-1 P-3 MANUFACTURER: DUNN EDWARDS COLOR: DE6223 "MISSION TRAIL" MANUFACTURER: DUNN EDWARDS COLOR: DE6192 "NOMADIC TAUPE" MANUFACTURER: DUNN EDWARDS COLOR: DE6193 "BAMBOO SCREEN" EXTERIOR FINISHES PRODUCT: 3-COAT STUCCO SYSTEM FINISH: FINE SAND FLOAT FINISH ST-1 CB-1 P-4 MANUFACTURER: DUNN EDWARDS COLOR: DE5375 "SANTA FE TAN" P-5 MANUFACTURER: DUNN EDWARDS COLOR: DE5272 "SEDONA AT SUNSET" INTERIOR FINISHES GB-1 5/8" TYPE X, GYPSUM BOARD. LEVEL 5 FINISH PLY-1 PLYWOOD, REFER TO STRUCTURAL PLANS M-1 MANUFACTURER: PRODUCT/FINISH: METAL FLASHING / TRIM PRODUCT: METAL CANOPY FINISH: CLEAR ANODIZED ALUMINUM C-1 PRODUCT: ARCHITECTURAL WALL PANEL CEMENT BOARD MANUFACTURER: NICHIHA MODEL: VINTAGEWOOD "REDWOOD" PRODUCT: 3-COAT STUCCO SYSTEM FINISH: COMBED FINISH ST-2 CB-2 PRODUCT: ARCHITECTURAL WALL PANEL CEMENT BOARD MANUFACTURER: NICHIHA MODEL: ILLUMINATION "CUSTOM" CB-3 PRODUCT: ARCHITECTURAL WALL PANEL CEMENT BOARD MANUFACTURER: NICHIHA MODEL: RIBBED "CUSTOM" PROJECT NUMBER DATE 121-04 4/16/2024 48151 Grapefruit Blvd.
Coachella, CA 92236
CONDITIONAL USE PERMIT AMENDMENT FOR
Coachella Gateway
Retail Building
NO.
- REVISION
- DATE-
LACK OLD NGINEERING
INC
B G E
Civil Engineering - Land Surveying - Design
42270 Spectrum Street, Indio, CA 92203
Ph: (760) 396-9260 - Fx: (760) 396-5245 USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLY 46 Item 3.
A1.4 BUILDING PERSPECTIVE VIEWS PROJECT NUMBER DATE 121-04 4/16/2024 48151 Grapefruit Blvd.
Coachella, CA 92236
CONDITIONAL USE PERMIT AMENDMENT FOR
Coachella Gateway
Retail Building
NO.
- REVISION
- DATE-
LACK OLD NGINEERING
INC
B G E
Civil Engineering - Land Surveying - Design
42270 Spectrum Street, Indio, CA 92203
Ph: (760) 396-9260 - Fx: (760) 396-5245 USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLY PROJECT NUMBER DATE 121-04 4/16/2024 48151 Grapefruit Blvd.
Coachella, CA 92236
CONDITIONAL USE PERMIT AMENDMENT FOR
Coachella Gateway
Retail Building
NO.
- REVISION
- DATE-
LACK OLD NGINEERING
INC
B G E
Civil Engineering - Land Surveying - Design
42270 Spectrum Street, Indio, CA 92203
Ph: (760) 396-9260 - Fx: (760) 396-5245 USE OF THIS DRAWING AND ANY REPRODUCTIONS SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED. REPRODUCTION OR RE-USE OF THIS DRAWING FOR ANY OTHER PURPOSE IS STRICTLY PROHIBITED FOR CITY USE ONLY 47 Item 3.
48 Item 3.
49 Item 3.
50 Item 3.
51 Item 3.
52 Item 3.
53 Item 3.
54 Item 3.
55 Item 3.
56 Item 3.
57 Item 3.
58 Item 3.
59 Item 3.
60 Item 3.
61 Item 3.
62 Item 3.
63 Item 3.
64 Item 3.
65 Item 3.
66 Item 3.
67 Item 3.
COACHELLAGATEWAY
CW-1CARWASH
CARWASH
FLOORPLAN
3/16”=1’-0”
68 Item 3.
69 Item 3.
70 Item 3.
71 Item 3.
72 Item 3.
73 Item 3.
74 Item 3.
75 Item 3.
76 Item 3.
77 Item 3.
COACHELLAGATEWAY R-5QUICKSERVICERESTAURANT QSR ELEVATIONS Restaurant
Restaurant
78 Item 3.
79 Item 3.
80 Item 3.
81 Item 3.
82 Item 3.
83 Item 3.
84 Item 3.
85 Item 3.
86 Item 3.
87 Item 3.
88 Item 3.
89 Item 3.
90 Item 3.
91 Item 3.
92 Item 3.
93 Item 3.
94 Item 3.
95 Item 3.
Vicinity Map
96 Item 3.
From: Tyler Hull
To: Adrian Moreno
Cc: Tommy Fowlkes
Subject: FW: RAC - CUP 377 AR 24-02 Coachella Gateway
Date: February 14 24 2:22:03 PM
Attachments: image002.png
image003.png
image005.png
RAC Transmittal.docx
Site Plan and Elevations.pdf
Hi AdrianCVWD has no comments for the proposed additional 4,627 shell building with drive-thru. Per the attached request for comments.
Thank you,
Tyler Hull
Utility Coordinator
Coachella Valley Water District
760-398-2661 ext. 2571
www.cvwd.org
FFrom: Adrian Moreno <[email protected]>
Sent: Wednesday, February 14, 2024 9:26 AM
To: Gabriel Perez <[email protected]>; Adrian Moreno <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; Andrew Simmons <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; IC-EnvironmentalServ <[email protected]>; ICEngineering <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]
Subject: FW: RAC - CUP 377 AR 24-02 Coachella Gateway
External e-mail: Do not click on links or open attachments unless you recognize the sender and you know the content is safe. o365
97 Item 3.
Hello Everyone,
I am forwarding the development plan set at a reduced file size to ensure everyone was able to receive the email. Please see email below.
Please return comments by Wednesday, February 28, 2024.
Feel free to reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
From: Adrian Moreno
Sent: February 14 24 9:07 AM
To: Gabriel Perez <[email protected]>; Adrian Moreno <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; 'andrew Simmons ([email protected])' <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>
Subject: RAC - CUP 377 AR 24-02 Coachella Gateway
98 Item 3.
Hello Everyone,
For your review, please find the attached Request for Agency Comments for CUP 377 AR 24-02 Coachella Gateway project.
The submittal for a Conditional Use Permit and Architectural Review for the proposed construction of a 4,627 square foot shell building with a drive-thru at the vacant parcel on Grapefruit Boulevard, south of Avenue 48, and north of the Dillon bridge at APN 603-220-057. A total of 27 new parking spaces are proposed, 18 spaces to the north and west of the building and 9 spaces on a separate landscape island. The proposed drive-thru provides vehicle stacking for approximately 22 vehicles.
The billboard on this lot will be removed as part of this project. Attached are the site plan, landscaping, and elevations for the project.
You may also access the files via Bluebeam Session ID: 640-743-919 Session URL: https://studio.bluebeam.com/hyperlink.html?link=studio.bluebeam.com/sessions/640- 743-919
Please return comments by Wednesday, February 28, 2024.
Please reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
99 Item 3.
100
Item 3.
101
Item 3.
102
Item 3.
103
Item 3.
City of Coachella
Enclosure Recommendation
Copy to City of Coachella | 2/27/24
February 27, 2024
Project Name: Coachella Gateway
Dear Chandi & Karan, LLC.,
Thank you for contacting Burrtec to review your plans for waste and recycling enclosure specifications. Per the site plans and construction information you provided for the proposed building at 48151 Grapefruit Blvd. in Coachella, Burrtec would be able to service the waste enclosure as seen on the plans.
Please see below for additional details pertaining to our recommendation:
Requires the following services:
☒ Solid waste service: Minimum level of service 3 yard/1 time per week ☒ Recycling service: Minimum level of service 3 yard/1 time per week meets AB341 Law ☒ Organics recycling service: Minimum level of service (1) 64-gallon commercial service/1 time per week meets AB1826/SB1383 Law
☐ De Minimis Waiver for Organics: Reviewed and organic matter not referenced Business type: ____________________________________________ Explanation: Approximate organic waste produced: Below 20-gallon/1 time per week threshold (subject to a follow-up post project completion) Enclosure Details: Commercial standard 3 yard bins are 81" wide (3.75') and 42" deep (3.5') with 6" curbs along the sides; rear facing commercial bins with the bins backing up to the sidewalls with 4' of clearance between them. Two 3 yard commercial bins can easily fit into an enclosure that is 12' wide and 9' deep.
That said, enclosure location appears to meet Burrtec requirements for service vehicle accessibility, safety and clearance. Burrtec is proud to service the City of Coachella. We look forward to providing services to your future project. Please contact me if you have any questions, or if I can be of further assistance at [email protected] .
Sincerely,
Cynthia Avalos
District Environmental Coordinator
104
Item 3.
From: Cynthia Avalos
To: Adrian Moreno
Subject: Re: RAC - CUP 377 AR 24-02 Coachella Gateway
Date: February 27 24 3:48:07 PM
Attachments: image002.png
image003.png
Outlook-tijj2v5i.png
Letter of Enclosure Service - Coachella Gateway.pdf
Hello,
On behalf of Burrtec Waste & Recycling Services there are no comments regarding changes to the site plans provided.
I have attached a letter of enclosure service for your records.
Please have the builder contact me for help with the diversion plan and with help setting up services.
Thank you,
Cynthia Avalos, BA
District Environmental Coordinator
Burrtec Waste and Recycling Services
Direct Number (760) 674-1034
Cell Number (760) 851-8930
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information or otherwise be protected by law. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message.
From: Adrian Moreno <[email protected]>
Sent: Tuesday, February 27, 2024 3:32 PM
To: Gabriel Perez <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; Andrew Simmons <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] 105
Item 3.
IMPORTANT: This email contains a POTENTIALLY DANGEROUS
ATTACHMENT. Do not click any link and do not open attachments unless you have confirmed the sender.
CAUTION: This is an external email from outside the organization. Please take care when clicking links or opening attachments. When in doubt, contact the IT Department. <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <IC[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; Cynthia Avalos <[email protected]>; [email protected] <[email protected]>; [email protected] <[email protected]>; Christopher Nicosia <[email protected]>; Eric Jordan <[email protected]> Subject: RE: RAC - CUP 377 AR 24-02 Coachella Gateway
You don't often get email from [email protected]. Learn why this is important Hello Everyone,
I just wanted to provide a friendly reminder that if your department has any comments for the CUP 377 AR 24-02 Coachella Gateway, please provide by the end of the day tomorrow Wednesday, February 28, 2024.
Feel free to reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
From: Adrian Moreno
Sent: February 14 24 9:26 AM
To: Gabriel Perez <[email protected]>; Adrian Moreno <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; andrew Simmons ([email protected]) <[email protected]>; Efrain Rodriguez 106
Item 3.
<[email protected]>; Celina Jimenez <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]
Subject: FW: RAC - CUP 377 AR 24-02 Coachella Gateway
Hello Everyone,
I am forwarding the development plan set at a reduced file size to ensure everyone was able to receive the email. Please see email below.
Please return comments by Wednesday, February 28, 2024.
Feel free to reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
From: Adrian Moreno
Sent: February 14 24 9:07 AM
To: Gabriel Perez <[email protected]>; Adrian Moreno <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; 'andrew Simmons ([email protected])' <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; 107
Item 3.
'[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>
Subject: RAC - CUP 377 AR 24-02 Coachella Gateway
Hello Everyone,
For your review, please find the attached Request for Agency Comments for CUP 377 AR 24-02 Coachella Gateway project.
The submittal for a Conditional Use Permit and Architectural Review for the proposed construction of a 4,627 square foot shell building with a drive-thru at the vacant parcel on Grapefruit Boulevard, south of Avenue 48, and north of the Dillon bridge at APN 603-220-057. A total of 27 new parking spaces are proposed, 18 spaces to the north and west of the building and 9 spaces on a separate landscape island. The proposed drive-thru provides vehicle stacking for approximately 22 vehicles.
The billboard on this lot will be removed as part of this project. Attached are the site plan, landscaping, and elevations for the project.
You may also access the files via Bluebeam Session ID: 640-743-919 Session URL: https://studio.bluebeam.com/hyperlink.html?link=studio.bluebeam.com/sessions/640- 743-919
Please return comments by Wednesday, February 28, 2024.
Please reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
108
Item 3.
CAL FIRE - RIVERSIDE UNIT
RIVERSIDE COUNTY FIRE DEPARTMENT
BILL WEISER - FIRE CHIEF
Office of the Fire Marshal (East)
77-933 Las Montanas Rd., Ste 201, Palm Desert, CA 92211 Bus: (760) 863-8886 ~ Fax: ~ rivcoplus.org
PROUDLY SERVING THE
UNINCORPORATED AREAS
OF RIVERSIDE COUNTY
AND THE CITIES OF:
BANNING
BEAUMONT
COACHELLA
DESERT HOT SPRINGS
EASTVALE
INDIAN WELLS
INDIO
JURUPA VALLEY
LAKE ELSINORE
LA QUINTA
MENIFEE
MORENO VALLEY
NORCO
PALM DESERT
PERRIS
RANCHO MIRAGE
RUBIDOUX CSD
SAN JACINTO
TEMECULA
WILDOMAR
BOARD OF SUPERVISORS
KEVIN JEFFRIES
DISTRICT 1
KAREN SPIEGEL
DISTRICT 2
CHARLES WASHINGTON
DISTRICT 3
V. MANUEL PEREZ
DISTRICT 4
DR. YXSTIAN GUTIERREZ
DISTRICT 5
Chandi & Karan LLC March 01, 2024
Attn:
Grapefruit Boulevard, south of Avenue 48, and north of the Dillon bridge
COACHELLA, CA
Project Name: RAC - CUP 377 AR 24-02 Coachella Permit Number: FPCUP2400008 Gateway: Bluebeam Session ID:
640-743-919: The submittal for a
Conditional Use Permit and
Architectural Review for the
proposed construction of a 4,627
square foot shell building with a
drive-thru at the vacant parcel on
Grapefruit Boulevard, south of
Avenue 48, and north of the Dillon
bridge at APN 603-220-057. A total
of 27 new parking spaces are
proposed, 18 spaces to the north
and west of the building and 9
spaces on a separate landscape
island. The proposed drive-thru
provides vehicle stacking for
approximately 22 vehicles. The
billboard on this lot will be removed
as part of this project.
Project Address:Grapefruit Boulevard, south of Case Type: Fire Conditional Use Permit (FPCUP) Avenue 48, and north of the Dillon
bridge
COACHELLA, CA
APN(s): 603220057 Reviewer: Kohl Hetrick
Review Number: 2
Riverside County Fire Department (RVCFD) Office of the Fire Marshal (OFM) has reviewed the submitted plans for the referenced project and they are approved with the following conditions. 015 - Fire
General Fire Department Advisory Comments - Commercial
With respect to the planning conditions for the referenced project, the fire department requires the following fire protection measures be provided in accordance with Riverside County Ordinances, the current edition of California Fire Code (CFC) as adopted and amended by the County of Riverside and/or recognized fire protection standards.
These conditions are preliminary and further review will be conducted upon receipt of additional entitlement and/or construction submittals. Additional requirements may be required based upon the adopted codes at the time of submittal.
1. Fire Protection Water Supplies/Fire Flow - Minimum fire flow for the construction of all buildings is required per CFC Appendix B. Prior to building permit issuance for new construction, the applicant shall provide documentation to show a (existing/proposed) water system capable of delivering the required fire flow. Specific design features may increase or 109
Item 3.
CAL FIRE - RIVERSIDE UNIT
RIVERSIDE COUNTY FIRE DEPARTMENT
BILL WEISER - FIRE CHIEF
Office of the Fire Marshal (East)
77-933 Las Montanas Rd., Ste 201, Palm Desert, CA 92211 Bus: (760) 863-8886 ~ Fax: ~ rivcoplus.org
PROUDLY SERVING THE
UNINCORPORATED AREAS
OF RIVERSIDE COUNTY
AND THE CITIES OF:
BANNING
BEAUMONT
COACHELLA
DESERT HOT SPRINGS
EASTVALE
INDIAN WELLS
INDIO
JURUPA VALLEY
LAKE ELSINORE
LA QUINTA
MENIFEE
MORENO VALLEY
NORCO
PALM DESERT
PERRIS
RANCHO MIRAGE
RUBIDOUX CSD
SAN JACINTO
TEMECULA
WILDOMAR
BOARD OF SUPERVISORS
KEVIN JEFFRIES
DISTRICT 1
KAREN SPIEGEL
DISTRICT 2
CHARLES WASHINGTON
DISTRICT 3
V. MANUEL PEREZ
DISTRICT 4
DR. YXSTIAN GUTIERREZ
DISTRICT 5
decrease the required fire flow.
a. Will Serve Letters from the responsible water purveyor are required prior to a map recordation.
2. Fire Protection Water Supplies/Hydrants - The minimum number of fire hydrants required, as well as the location and spacing of fire hydrants, shall comply with CFC Appendix C and NFPA 24. Fire hydrants shall be located no more than 400 feet from all portions of the exterior of the building along an approved route on a fire apparatus access road, unless otherwise approved by the Fire Department. Where new water mains are extended along streets where hydrants are not needed for protection of structures, standard fire hydrants shall be provided at spacing not to exceed 1000 feet along streets for transportation hazards. Fire hydrants shall be at least 40 feet from the building it is serving.
A fire hydrant shall be located within 20 to 100 feet of the fire department connection for buildings protected with a fire sprinkler system. The size and number of outlets required for the approved fire hydrants are 4” x 2 ½” x 2 ½” (super hydrant). Reference CFC as amended and NFPA 24.
3. Fire Department Access - Fire apparatus access roads shall be provided to within 150 feet of all exterior portions of buildings, unless otherwise approved by the Fire Department.
Fire apparatus access roads shall have an unobstructed width of not less than 24 feet.
Dead-end fire apparatus access roads in excess of 150 feet shall be provided with an approved turn around. The minimum required turning radius of a fire apparatus access road is 38 feet outside radius and 14 feet inside radius. The construction of the fire apparatus access roads shall be all weather and capable of sustaining 75,000 lbs. Unless otherwise approved, the grade of a fire apparatus access road shall not exceed 16 percent and the cross slope shall not exceed 2.5 percent. The angles of approach and departure for fire apparatus access roads shall be a maximum of 6 percent grade change for 25 feet of approach/departure. Reference CFC as amended and Riverside County Fire Department Policies and Standards.
a. Fire Lane marking: Identification and marking of fire lanes, including curb details and signage shall be in compliance with Riverside County Fire Department Standards.
4. Fire Department Building Construction Plan Review - Submittal of construction plans to the Fire Department will be required. Final fire and life safety conditions will be addressed when the Fire Department reviews the plans. These conditions will be based on California Fire Code, California Building Code (CBC), and related codes/standards adopted at the time of construction plan submittal. Reference CFC as amended.
5. Fire Sprinkler System - All new commercial buildings and structures 3,600 square feet or larger will be required to install a fire sprinkler system. Reference CFC as amended.
6. Fire Alarm and Detection System - A water flow monitoring system and/or fire alarm system may be required as determined at time of building construction plan review.
Reference CFC as amended.
7. Traffic Calming Devices - Requests for installation of traffic calming designs/devices on fire apparatus access roads shall be submitted for evaluation purposes, resulting in denial or approval by the Fire Code Official. Reference CFC as amended.
8. Gate Access - All electronically operated gates shall be provided with Knox key switches and automatic sensors for access. These gates shall be provided with access to gate equipment or another method to open the gate if there is a power failure. (Manual gates shall not be locked unless a Knox padlock or Knox Box containing the key to the lock is 4080 Lemon Street, 10th Floor, Riverside, CA 92501 - (951) 955-4777 ~ Fax: (951) 955-4886 110
Item 3.
CAL FIRE - RIVERSIDE UNIT
RIVERSIDE COUNTY FIRE DEPARTMENT
BILL WEISER - FIRE CHIEF
Office of the Fire Marshal (East)
77-933 Las Montanas Rd., Ste 201, Palm Desert, CA 92211 Bus: (760) 863-8886 ~ Fax: ~ rivcoplus.org
PROUDLY SERVING THE
UNINCORPORATED AREAS
OF RIVERSIDE COUNTY
AND THE CITIES OF:
BANNING
BEAUMONT
COACHELLA
DESERT HOT SPRINGS
EASTVALE
INDIAN WELLS
INDIO
JURUPA VALLEY
LAKE ELSINORE
LA QUINTA
MENIFEE
MORENO VALLEY
NORCO
PALM DESERT
PERRIS
RANCHO MIRAGE
RUBIDOUX CSD
SAN JACINTO
TEMECULA
WILDOMAR
BOARD OF SUPERVISORS
KEVIN JEFFRIES
DISTRICT 1
KAREN SPIEGEL
DISTRICT 2
CHARLES WASHINGTON
DISTRICT 3
V. MANUEL PEREZ
DISTRICT 4
DR. YXSTIAN GUTIERREZ
DISTRICT 5
installed in an approved location on the approach side of the gate). A pedestrian gate, if used to provide access, shall be a minimum 3 feet wide and provided with a Knox Box/Padlock if locked. Reference CFC as amended.
9. Water Plans - If fire hydrants are required to be installed, applicant/developer shall furnish the water system fire hydrant plans to the Fire Department for review and approval prior to building permit issuance. Plans shall be signed by a registered civil engineer, and shall confirm hydrant type, location, spacing, and minimum fire flow. Once plans are signed and approved by the local water authority, the originals shall be presented to the Fire Department for review and approval. Reference CFC as amended.
We appreciate the oppprtunity to work together to ensure fire, rescue, medical and all hazard emergency services are provided to our County and all of the residents.
Should you have additional questions, please contact me via phone at or email at [email protected].
Steven Gonzalez
Fire Safety Specialist
4080 Lemon Street, 10th Floor, Riverside, CA 92501 - (951) 955-4777 ~ Fax: (951) 955-4886 111
Item 3.
From: Tsang, Kevin
To: Adrian Moreno
Subject: RE: RAC - CUP 377 AR 24-02 Coachella Gateway
Date: February 27 24 4:46:39 PM
Attachments: image002.png
image003.png
Hello Adrian,
Thank you for the opportunity to review the development project. I do not have any comments to provide.
Thanks
From: Adrian Moreno <[email protected]>
Sent: Tuesday, February 27, 2024 3:33 PM
To: Gabriel Perez <[email protected]>; Eva Lara <[email protected]>; mmartinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; Andrew Simmons <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; Vasquez, Randy <[email protected]>; [email protected]; IC[email protected]; [email protected]; Hetrick, Kohl <[email protected]>; Tsang, Kevin <[email protected]>; Pablo, Marisela <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; Christopher Nicosia <[email protected]>; Eric Jordan <[email protected]>
Subject: RE: RAC - CUP 377 AR 24-02 Coachella Gateway
CAUTION: This email originated externally from the Riverside County email system. DO NOT click links or open attachments unless you recognize the sender and know the content is safe.
Hello Everyone,
I just wanted to provide a friendly reminder that if your department has any comments for the CUP 377 AR 24-02 Coachella Gateway, please provide by the end of the day tomorrow Wednesday, February 28, 2024.
Feel free to reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
112
Item 3.
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
From: Adrian Moreno
Sent: February 14 24 9:26 AM
To: Gabriel Perez <[email protected]>; Adrian Moreno <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; andrew Simmons ([email protected]) <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]
Subject: FW: RAC - CUP 377 AR 24-02 Coachella Gateway
Hello Everyone,
I am forwarding the development plan set at a reduced file size to ensure everyone was able to receive the email. Please see email below.
Please return comments by Wednesday, February 28, 2024.
Feel free to reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
113
Item 3.
Website | Map
From: Adrian Moreno
Sent: February 14 24 9:07 AM
To: Gabriel Perez <[email protected]>; Adrian Moreno <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; 'andrew Simmons ([email protected])' <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>
Subject: RAC - CUP 377 AR 24-02 Coachella Gateway
Hello Everyone,
For your review, please find the attached Request for Agency Comments for CUP 377 AR 24-02 Coachella Gateway project.
The submittal for a Conditional Use Permit and Architectural Review for the proposed construction of a 4,627 square foot shell building with a drive-thru at the vacant parcel on Grapefruit Boulevard, south of Avenue 48, and north of the Dillon bridge at APN 603-220-057. A total of 27 new parking spaces are proposed, 18 spaces to the north and west of the building and 9 spaces on a separate landscape island. The proposed drive-thru provides vehicle stacking for approximately 22 vehicles.
The billboard on this lot will be removed as part of this project. Attached are the site plan, landscaping, and elevations for the project.
You may also access the files via Bluebeam Session ID: 640-743-919 Session URL: https://studio.bluebeam.com/hyperlink.html?link=studio.bluebeam.com/sessions/640- 743-919
Please return comments by Wednesday, February 28, 2024.
Please reach out with any questions.
Thanks,
114
Item 3.
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
Confidentiality Disclaimer
This email is confidential and intended solely for the use of the individual(s) to whom it is addressed. The information contained in this message may be privileged and confidential and protected from disclosure.
If you are not the author's intended recipient, be advised that you have received this email in error and that any use, dissemination, forwarding, printing, or copying of this email is strictly prohibited. If you have received this email in error please delete all copies, both electronic and printed, and contact the author immediately.
County of Riverside California
115
Item 3.
From: Vasquez, Randy <[email protected]>
Sent: February 28 24 8:04 AM
To: Adrian Moreno
Subject: RE: RAC - CUP 377 AR 24-02 Coachella Gateway
No comments
Lieutenant Randy Vasquez #1541
Thermal Station
86625 Airport Boulevard
Thermal, CA 92274
E-mail: [email protected]
Office: 760-863-8990
Desk: 760-863-7962
From: Adrian Moreno <[email protected]>
Sent: Tuesday, February 27, 2024 3:33 PM
To: Gabriel Perez <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; Andrew Simmons <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; Vasquez, Randy <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; Tsang, Kevin <[email protected]>; Pablo, Marisela <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; Christopher Nicosia <Christopher.Nicosia@29palmsbominsn.gov>; Eric Jordan <[email protected]> Subject: RE: RAC - CUP 377 AR 24-02 Coachella Gateway
Hello Everyone,
I just wanted to provide a friendly reminder that if your department has any comments for the CUP 377 AR 24-02 Coachella Gateway, please provide by the end of the day tomorrow Wednesday, February 28, 2024.
Feel free to reach out with any questions.
CAUTION: This email originated from outside the Riverside Sheriff email system.
DO NOT click links or open attachments unless you recognize the sender and know the content is safe. 116
Item 3.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
From: Adrian Moreno
Sent: February 14 24 9:26 AM
To: Gabriel Perez <[email protected]>; Adrian Moreno <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; andrew Simmons ([email protected]) <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected]; [email protected] Subject: FW: RAC - CUP 377 AR 24-02 Coachella Gateway
Hello Everyone,
I am forwarding the development plan set at a reduced file size to ensure everyone was able to receive the email. Please see email below.
Please return comments by Wednesday, February 28, 2024.
Feel free to reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
117
Item 3.
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
From: Adrian Moreno
Sent: February 14 24 9:07 AM
To: Gabriel Perez <[email protected]>; Adrian Moreno <[email protected]>; Eva Lara <[email protected]>; Maritza Martinez <[email protected]>; Castulo Estrada <[email protected]>; Abraham Vega <[email protected]>; Gabriel Martin <[email protected]>; Lizzandro Diaz <[email protected]>; 'andrew Simmons ([email protected])' <[email protected]>; Efrain Rodriguez <[email protected]>; Celina Jimenez <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>
Subject: RAC - CUP 377 AR 24-02 Coachella Gateway
Hello Everyone,
For your review, please find the attached Request for Agency Comments for CUP 377 AR 24-02 Coachella Gateway project.
The submittal for a Conditional Use Permit and Architectural Review for the proposed construction of a 4,627 square foot shell building with a drive-thru at the vacant parcel on Grapefruit Boulevard, south of Avenue 48, and north of the Dillon bridge at APN 603-220-057. A total of 27 new parking spaces are proposed, 18 spaces to the north and west of the building and 9 spaces on a separate landscape island.
The proposed drive-thru provides vehicle stacking for approximately 22 vehicles. The billboard on this lot will be removed as part of this project. Attached are the site plan, landscaping, and elevations for the project.
You may also access the files via Bluebeam Session ID: 640-743-919 Session URL: https://studio.bluebeam.com/hyperlink.html?link=studio.bluebeam.com/sessions/640- 743-919
118
Item 3.
Please return comments by Wednesday, February 28, 2024.
Please reach out with any questions.
Thanks,
Adrian Moreno | Associate Planner
City of Coachella ◦ Development Services Department
53990 Enterprise Way ◦ Coachella, CA 92236
Phone: 760-398-3502 Ext: 118
Email: [email protected]
Office Hours: Monday - Thursday 7:00 AM to 6:00 PM
Closed Fridays
Website | Map
119
Item 3.
STAFF REPORT
5/1/2024
TO: Planning Commission Chair and Commissioners
FROM: Adrian Moreno, Associate Planner
SUBJECT: CUP 375 AR No. 23-14 – Coachella Islamic Center Parking Lot for the construction of a parking lot to serve the existing building at 84650 Ave 49.
Applicant: Islamic Society of Palm Springs.
STAFF RECOMMENDATION:
Staff recommends that the Planning Commission continue consideration of Resolution No.
PC2024-07 approving Conditional Use Permit 375 and Architectural Review No. 23-14 for the construction of a parking lot to serve the existing building at 84650 Ave 49, (APN: 603-250-015) to the Planning Commission meeting of May 15, 2024 as the project will require site plan modifications subject to Fire Department safety concerns. 120
Item 4.