Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 16 necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District No. 23 – La Colonia I
The improvements consist of two storm drainage retention basins, one open space lot, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District No. 24 – La Paloma Estates
The improvements consist of four storm drainage retention basins, one open space lot, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District No. 25 – Las Plumas
The improvements include two storm drainage detention basins, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District No. 27 – Rancho Mariposa
The improvements include two storm drainage detention basins, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 17 sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District No. 28 – La Morada
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District No. 29 – Somerset
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District No. 30 – Navarra / Sundate I
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 18 District 31 – Los Jardines
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District 32 – Aventine
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District 33 – Vista Escondida
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District 34 – Tierra Bonita
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 19 system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District 35 – Bellisima
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District 36 – Valencia
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District 37 – Volk (Tract Map Not Recorded, Not Developed) The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 20 District 38 – Rancho Cielo
The improvements include storm drainage detention basin, street lighting for the tracts, and parkway landscaping between the sidewalk and block wall adjacent to the tracts. The landscaping improvements could consist of an automatic sprinkler system, hardscape, plant material located in the areas described. The sprinkler system is complete with electric supply, water supply, automatic clock, piping, various types of heads and all other items incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf. The storm drain system is complete with catch basins, manholes, drywells, pipes drainage structures and all other incidental and necessary to make the system operational. The landscaping consists of materials such as trees, shrubs, ground cover, and turf.
District 39 – Sevilla
Landscape improvements generally include, but are not limited to, approximately:
eighty-six thousand, eight hundred and thirty-six (86,836) square feet of ground covering and shrubs including ninety-three (93) irrigated drought-tolerant trees.
Landscaping located on two (2) storm drainage detention basin lots, also on the north side of Avenue 51, including the entrance at Via Prado as well as the corners of Calle Perez and Calle Larriva. The street lighting improvements include providing energy to operate twenty-four (24) street lighting poles within Tract Map No. 38084.
District 40 – Mariposa Pointe
The District’s landscape improvements generally include but not limited to approximately: eighty four thousand seven hundred and five (84,705) square feet of ground covering and shrubs including one hundred nineteen (119) irrigated drought-tolerant 24” box trees and landscaping located on Avenue 50 and Calhoun Street, two (2) storm drainage detention basin lots, a pedestrian trail, and landscape improvements at the entryways on Avenue 50 and Calhoun Street. The street lighting improvements include but is not limited to approximately:
D. DESCRIPTION OF CAPITAL IMPROVEMENT PROJECTS
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 21 III. METHOD OF APPORTIONMENT
The 1972 Act permits the establishment of assessment districts by agencies for the purpose of providing certain public improvements, including the acquisition, construction, installation and servicing of landscape improvements and related facilities. The 1972 Act requires that the cost of these improvements be levied according to benefit rather than assessed value:
Section 22573 defines the net amount to be assessed as follows:
“The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.” The formula used for calculating assessments reflect the composition of parcels within the Districts and the improvements and activities to be provided and have been designed to fairly apportion the cost of providing those improvements based on a determination of the proportional special benefits to each parcel, consistent with the requirements of the 1972 Act and the provisions of Proposition 218 and Article XIII D of the California Constitution.
A. CALIFORNIA CONSTITUTION
The costs to operate and maintain the Districts improvements are identified and allocated to properties on the special benefits conferred. The improvements provided and for which properties within the Districts are to be assessed are identified as local improvements and related amenities that were installed in connection with the development of the properties and/or would otherwise be required for the development of properties within the Districts and consistent with the provisions of the 1972 Act. The assessments and method of apportionment described herein are based on the premise that these improvements would otherwise not have been installed and maintained by the County. The improvements were installed as part of the development or planned development of the parcels within the Districts and the level of maintenance required for the improvements is greater than what the County would otherwise install, maintain, and fund elsewhere in the County.
Article XIII D Section 2(d) defines District as follows:
“District means an area determined by an agency to contain all parcels which will receive a special benefit from a proposed public improvement or property-related service.”
Article XIII D Section 2(i) defines special benefit as follows:
“Special benefit” means a particular and distinct benefit over, and above general benefits conferred on real property located in the district or to the public at large.
General enhancement of property value does not constitute “special benefit.”
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 22 Article XIII D Section 4(a) defines proportional special benefit assessments as follows:
“An agency which proposes to levy an assessment shall identify all parcels which will have a special benefit conferred upon them and upon which an assessment will be imposed. The proportionate special benefit derived by each identified parcel shall be determined in relationship to the entirety of the capital cost of a public improvement, the maintenance and operation expenses of a public improvement, or the cost of the property related service being provided. No assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel.”
B. BENEFIT ANALYSIS
The improvements provided within the Districts, for which properties will be assessed have been identified as necessary, desired and/or required for the orderly development of the properties within the Districts to their full potential, consistent with the development plans.
SPECIAL BENEFITS
The ongoing maintenance of landscaped areas within the Districts will provide aesthetic benefits to the properties and are intended to provide a more pleasant environment to walk, drive, live, and work. The primary function of these improvements and related amenities is to serve as an aesthetically pleasing enhancement and open space area for the benefit of the immediate surrounding properties and development for which the improvements were constructed and installed, and/or were facilitated by the development or potential development of properties within the Districts. These improvements are an integral part of the physical environment associated with the parcels in the Districts and while these improvements may in part be visible to properties outside the Districts and/or occasionally accessed by the general public, if these improvements are not properly maintained, it is the parcels within the District that would be aesthetically burdened and/or impacted directly by potential environmental issues such as dust, debris, pests, water runoff, erosion, and fire hazards. Thus, the maintenance of these improvements provides advantages to the assessed properties that affect the assessed parcels in a way that is particular and distinct from their effect on other parcels and that real property in general and the public at large do not share.
Collectively these improvements, related amenities, and services which will be funded by the special benefit assessments, enhance the overall use, presentation, enjoyment, recreational access, and marketability of the properties, and ensure the long-term cost-efficiency of services that are obtained through the County provided maintenance (economy of scale).
GENERAL BENEFIT
In reviewing the location and extent of the specific landscaped areas and improvements to be funded by the Districts assessments and the proximity and
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 23 relationship to properties to be assessed, it is evident these improvements have been installed as part of the development of properties within the Districts or are improvements that would otherwise be shared by and/or required for development of those properties. Although the improvements are largely located on the north side of Avenue 51, including the entrance at Via Prado as well as the corners of Calle Perez and Calle Larriva of the development and may be visible and/or accessible to the general public, it is evident that the ongoing maintenance of these improvements are only necessary for the appearance and advantage of the properties within the Districts. It is also evident that these improvements were not required nor necessarily desired by any properties or developments outside of the Districts’ boundaries.
Ongoing maintenance of improvements are additionally located on the south side of Avenue 50, east side of Calhoun Street and Calle Frontera as well as the corner of Avenida San Domingo and Calle Xavier. It is evident that the ongoing maintenance of these improvements is only necessary for the appearance and advantage of the properties within the Districts. It is also evident that these improvements were not required nor necessarily desired by any properties or developments outside of the Districts’ boundaries.
In the absence of a special funding, these types of improvements would not have been installed by the developer per the City’s conditions and the City’s maintenance of these improvements would for the most part, be limited to weed abatement (fuel modification areas), rodent control, and erosion control services only. This basic or baseline level of service would typically provide for periodic servicing of the open space areas on an as-needed basis. This baseline level of service would only provide a level of service that was necessary to ensure public safety, essential property protection and potential property damage. However, this baseline level of service results in a far less visually pleasing environment than is created with the enhanced levels of services associated with the regular landscape maintenance that can be provided through the Districts assessments.
In addition to this baseline level of service, it is recognized that there are indirect or incidental benefits to properties within the Districts as well as the general public that are associated with regular landscape maintenance services, including minimization of dust and debris, and decreased potential water runoff from the open space areas.
It is also recognized that with the regular maintenance of the improvements, the effort and cost to monitor and address these more indirect issues are reduced to isolated areas and/or less frequent servicing, and these activities generally represent less than two percent (2%) of the overall maintenance costs. Therefore, conservatively, we estimate that the costs associated with these indirect and incidental benefits (General Benefit) do not exceed five percent (5%) of the combined annual expenses for General Maintenance identified in the annual maintenance budget contained in "Part IV –Districts Budget” of this Report.
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 24 C. ASSESSMENT METHODOLOGY
To assess benefits equitably it is necessary to calculate each property’s relative share of the special benefits conferred by the funded improvements and service.
The Equivalent Benefit Unit (EBU) method of assessment apportionment is utilized for the Districts and establishes a basic unit (base value) of benefit and then calculates the benefit derived by each assessed parcel as a multiple (or a fraction) of that basic unit. The EBU method of apportioning special benefits is typically seen as the most appropriate and equitable assessment methodology for assessment districts, as the benefit to each parcel from the improvements are apportioned as a function of comparable property characteristics which may include but is not limited to land use and property size.
Pursuant to the 1972 Act, the costs of the Districts may be apportioned by any formula or method that fairly distributes the net amount to be assessed, among all assessable parcels in proportion to the estimated benefits to be received by each parcel from the improvements. The benefit formula used for the Districts should reflect the composition of the parcels, and the improvements and services provided, to fairly apportion the costs based on special benefit to each parcel.
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 25
EBU APPLICATION
Single Family Residential — This land use is defined as a fully subdivided residential home site with or without a structure and the improvements and services associated with the parcel has been accepted or will be accepted by the City for maintenance in the fiscal year. This land use is assessed at 1.0 EBU per lot or parcel.
Planned -Residential Development — This land use is defined as any property that specific number of proposed single-family residential lots has been approved for development (not fully subdivided). This land use type shall be assigned 1.0 EBU per lot at build-out.
Vacant — This is defined as property that has been identified as parcels with no development but has development potential. Although it is recognized that the improvements provided within the Districts were primarily constructed and installed as the result of property development, it is also recognized that the majority of these improvements were constructed in part to support the overall development of properties within the District and/or Development to their full and best use, including vacant undeveloped properties.
ASSESSMENT CALCULATIONS
The benefit formula applied to parcels within each District is based on the preceding Equivalent Benefit Unit (EBU) discussion. Each parcel's EBU correlates the parcel’s special benefit received as compared to all other parcels benefiting from the improvements. The following formula is used to calculate each parcel’s EBU (proportional benefit).
Parcel Type EBU x Units = Parcel EBU
For each District, the total number of Equivalent Benefit Units (EBU’s) for the fiscal year equals the sum of all individual EBU’s applied to parcels in that District. An assessment amount per EBU (Rate) for the improvements is established by taking the total cost of the improvements (amount budgeted) and dividing that amount by the total number of EBU’s of all parcels to be assessed. This Rate is then applied back to each parcel’s individual EBU to determine the parcel’s proportionate benefit and assessment obligation for the improvements.
Total Balance to Levy (for the District)/ Total EBU (to be assessed) = Levy per EBU Levy per EBU x Parcel EBU = Parcel Levy Amount
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 26 D. ASSESSMENT RANGE FORMULA
Any new or increased assessment requires certain noticing and meeting requirements by law. Prior to the passage of Proposition 218 (California Constitution Articles XIIIC and XIIID), legislative changes in the Brown Act defined a "new or increased assessment" to exclude certain conditions. These conditions included "any assessment that does not exceed an assessment formula or range of assessments previously adopted by the agency or approved by the voters in the area where the assessment is imposed." This definition and conditions were later confirmed through Senate Bill 919 (the Proposition 218 implementing legislation).
The purpose of establishing an assessment range formula is to provide for reasonable increases and inflationary adjustment to annual assessments without requiring costly noticing and mailing procedures, which could add to the Districts costs and assessments. As part of the Districts formation, balloting of property owners is required pursuant to the Article XIIID Section 4. The property owner ballots include an Assessment to be approved, as well as the approval of an assessment range formula.
District No.’s 1 through 4, and 6 through 11, and 38 – The maximum assessment rates do not increase and will remain the same from FY 2023/2024.
District No.’s 12 through 25, and 27 through 36 – The maximum assessment rate may increase by the percentage increase of the Consumer Price Index (“CPI”) or three percent (3%). The CPI used shall be as determined by the Bureau of Labor Statistics for a similar period of time.
Each Fiscal Year, the Engineer shall compute the percentage difference between the CPI. By approval of the City Council, the assessment rate that may be levied for each EBU may be increased in each year in accordance with the U.S. Bureau of Labor Statistics Data, All Urban Consumers, Riverside-San Bernardino-Ontario CPI index. Such assessment adjustments shall not be considered an increase in assessment. A proposed assessment that exceeds the adjusted assessment rate will require property owner balloting approval before the increase may be imposed.
For Fiscal Year 2024/2025, the change in the Annual CPI for the All Urban Consumers, Riverside-San Bernardino-Ontario CPI index is 2.88% therefore the assessment rate will be adjusted by 3.00%.
District No.’s 39 and 40 – The maximum assessment rate may increase by the greater of three percent (3.00%) or the annual precent increase of the Consumer Price Index (“CPI”) determined by the Bureau of Labor Statistics.
If the proposed assessment (levy per unit or rate) for the current fiscal year is less than or equal to, the prior year's maximum assessment rate plus the adjustments described in the following, then the proposed assessment is not considered an increased assessment. The purpose of establishing an assessment range formula
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 27 is to provide for reasonable inflationary adjustment to the assessment amounts without requiring costly noticing, balloting and mailing procedures, which would be added to the Districts’ costs and assessments.
The Maximum Assessment is adjusted annually and is calculated independent of the annual budget and proposed annual assessment. Any proposed annual assessment (rate per EBU less than or equal to this Maximum Assessment) is not considered an increased assessment, even if the proposed assessment is greater than the assessment applied in the prior fiscal year.
Although the Maximum Assessment will increase each year, the actual assessment may remain unchanged. The Maximum Assessment adjustment is designed to establish a reasonable limit on assessments. The Maximum Assessment calculated each year does not require or facilitate an increase to the annual assessment and neither does it restrict assessments to the adjusted maximum amount. If the budget and assessment for the fiscal year do not require an increase, or the increase is less than the adjusted Maximum Assessment, then the required budget and assessment may be applied without additional property owner balloting. If the budget and assessments calculated requires an increase greater than the adjusted Maximum Assessment, then the assessment is considered an increased assessment and would be subject to balloting.
IV. DISTRICT BUDGETS
The 1972 Act provides that the estimated costs of the improvements shall include the total cost of the improvements, including incidental expenses.
The 1972 Act also provides that the amount of any surplus, deficit, or contribution be included in the estimated cost of improvements. The net amount to be assessed on the lots or parcels within the Districts is the total cost of maintenance, and servicing with adjustments either positive or negative for reserves, surpluses, deficits, and/or contributions.
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 29 TABLE II – 2024/2025 DISTRICT BUDGETS
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 30
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 30
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 32
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 33 APPENDIX A – DISTRICT ASSESSMENT DIAGRAMS
The boundary maps/diagrams for the Districts by this reference are incorporated and made a part of this Report. The boundary maps/diagrams are on file in the office of the City Clerk where it is available for public inspection. The following map pages are for general location only and are not to be considered the official boundary maps.
Item 11.
2024/2025 Consolidated Engineer’s Report City of Coachella - Assessment Districts Page 34 APPENDIX B – 2024/2025 PRELIMINARY ASSESSMENT ROLL
Parcel identification, for each lot or parcel within the Districts, shall be the parcel as shown on the County Assessor Parcel Maps and/or the Riverside County Secured Tax Roll for the year in which this Report is prepared.
Non-assessable lots or parcels may include government owned land; public utility owned property, land principally encumbered with public right-of-way’s or easements and dedicated common areas. These parcels will not be assessed.
A listing of parcels within the Districts, along with the proposed assessment amounts, has been submitted to the City Clerk, and by reference, are made part of this Report.
Upon approval of the Report, and confirmation of the assessments, the assessment information will be submitted to the County Auditor/Controller and included on the property tax roll in Fiscal Year 2024/2025. If the parcels or assessment numbers within the Districts and referenced in this Report, are re-numbered, re-apportioned or changed by the County Assessor’s Office after approval of the Report, the new parcel or assessment numbers with the appropriate assessment amount will be submitted to the County Auditor/Controller. If the parcel change made by the County includes a parcel split, parcel merger or tax status change, the assessment amount submitted on the new parcels or assessment numbers will be based on the method of apportionment and levy amount approved in this Report by the City Council.
Item 11.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Andrew Simmons, P.E., City Engineer
SUBJECT: Professional Service Agreement with Kimley-Horn to prepare a Local Road Safety Plan (LRSP) for the City of Coachella in an amount of $60,000.00.
STAFF RECOMMENDATION:
Authorize the City Manager to use on-call Professional Service Agreement with Kimley-Horn in an amount of $60,000 to prepare a Local Road Safety Plan (LRSP) for the City of Coachella.
BACKGROUND:
In October 2019, Caltrans announced a Call for Local Roadway Safety Plan (LRSP) applications.
The City submitted an LRSP application to Caltrans and the application was accepted and state funding allocation of $44,000 was approved. The City committed to a local match of $16,000 for a total budget of $60,000 to conduct the LRSP.
On October 12, 2022 City Council adopted Resolution 2022-90 approving Master Agreement No. 08-5294S21 and Program Supplement Agreement No. 000000X76 between the State of California and the City of Coachella for the Local Road Safety Plan Project Federal Aid #LRSPL-5294(019).
The LRSP will provide the City a look-ahead for safety improvements that can be applied systemically and programmed though the Capital Improvement Plan. Additionally, this information will be used to help the City apply for grants and other funding opportunities to implement these safety improvements.
DISCUSSION/ANALYSIS:
Staff published a request for qualifications for on-call engineering services and received 21 responses. On January 25, 2023 the City Council authorized the City Manager to qualify and execute Professional Service Agreements for on-call engineering services with eight (8) firms, including Kimley-Horn. The qualified firms were evaluated and Kimley-Horn was selected based on experience, schedule and familiarity with the area. Kimley-Horn has prepared Local Road Safety Plans for many cities throughout the Coachella Valley including Indio, Palm Springs, and Palm Desert. Their experience with LRSPs and the area will allow the LRSP to be completed correctly and quickly within budget.
Item 12.
FISCAL IMPACT:
No fiscal impact to CIP FY 23/24 budget. The local match for this project is $16,000 and has been appropriated in the CIP FY 23/24 budget.
ATTACHMENTS:
1. Kimley-Horn Proposal
2. Kimley-Horn PSA
Item 12.
kimley-horn.com 73-700 Dinah Shore Drive, Unit 101, Palm Desert, CA 92211 760 565 5103 May 28, 2024
By email
Ms. Brianna Greenwood
City of Coachella
53990 Enterprise Way
Coachella, CA 92236
RE: Proposal to Prepare a Local Road Safety Plan (LRSP) for the City of Coachella Dear Ms. Greenwood:
Kimley-Horn and Associates, Inc. (Kimley-Horn or “the Consultant”) is pleased to submit this letter proposal to the City of Coachella (the “Client”) to prepare a Local Road Safety Plan (LRSP). Our understanding, scope of services, schedule, and fee to perform these services are included below.
Project Understanding
The City received funding through Caltrans’ Highway Safety Improvement Program (HSIP) allocation for a LRSP. The City must complete the LRSP to be eligible for further HSIP funding in the Cycle 12 call for projects that is due for submittal in September 9, 2024. It is critical that the City has a qualified planning document in place before that submittal deadline. Additionally, there is an anticipated call for projects in August through the federal Safe Streets and Roads for All initiative that can be leveraged to enhance the LRSP to a full Safety Action Plan (SAP) that will have further utility for the City in reducing traffic injuries and fatalities, and will open more federal funding opportunities. The consultant will develop the LRSP with those goals in mind.
Scope of Services
Task 1 – Project Management & Meetings
Task 1.1 – Project Management & Kick-off Meeting, Project Update Meetings Kimley-Horn will prepare an agenda and conduct a project kick off meeting to review and refine the project methodology and schedule and to establish a Project Development Team (PDT) with key City staff, which we will maintain close and consistent communication through regular PDT status meetings to discuss plan development and project progress. Meetings are anticipated to be held virtually given current conditions.
Kimley-Horn will assist the City in providing administrative support to make sure the project is in compliance with the Local Assistance Procedure Manual guidelines.
Kimley-Horn has established internal quality control processes that include multiple levels of review before deliverables are submitted to a client, including a designated quality control officer that is not part of the core project team to provide objective feedback from the perspective of someone external to the project. Kimley-Horn recommends in-person meetings, if conditions allow, at the following project milestones:
Item 12.
kimley-horn.com 73-700 Dinah Shore Drive, Unit 101, Palm Desert, CA 92211 760 565 5103
1. Project Kick-Off
2. Selection of High-Collision Sites for Project Development
3. Field Review Debrief
4. Project Recommendations
Additionally, Kimley-Horn will hold a short bi-weekly project progress meeting with the City project manager to discuss the current status of the project and to make decisions about project direction as alternative courses emerge.
During our kick-off meeting we will identify safety partners/stakeholders who should be included in future project communications. We value representation from the local community, businesses, nonprofit organizations, local transportation providers, City’s Public Works department, Riverside County Sheriff, Riverside County Fire Department, Coachella Valley and Desert Sands School Districts, and health and safety agencies when creating a well-rounded safety plan.
Task 1 Deliverables:
• Project Kickoff Meeting
• Project Update Meeting Agenda & Notes
• Monthly Progress Reports
Task 2 - Identify and Engage Stakeholders
Task 2.1 – Identify Stakeholders
Kimley-Horn will work with the City to identify stakeholders that will be engage throughout the LRSP process. Key stakeholders will include those identified during the kick-off meeting in Task 1.
Task 2.2 – Identify Project Goals and Objectives
We will work with City staff to establish goals and objectives after completing the comprehensive data analysis with a focus on improving traffic and pedestrian safety. We will establish the emphasis areas.
The team will identify safety challenges specific to the City of Coachella that are elevating the risk of traffic injuries. The goals and objectives will be structured to meet the needs of the LRSP Program, provide optimal support of statewide funding priorities, and incorporate Priority Safety Strategies, Infrastructure Safety Projects, and Behavioral Safety Strategies and feedback from stakeholders and City staff. Each goal will be associated with a set of objectives that will help determine the prioritization of plan recommendations.
Task 2.3 – Stakeholder Meetings
Kimley-Horn will work with the City to reach out to safety partners/stakeholders from the contact list developed. Up to three Stakeholder meetings will be hosted, either virtually or in-person to allow for two-way communication and feedback on the materials communicated. The meetings will provide an overview of the LRSP process, identify/establish safety goals, objectives, strategies and emphasis areas, inform those present on the results found during the crash analysis, and outline the draft countermeasures and potential solutions. Stakeholders will be utilized for their local insight on the area, any challenges or opportunities they may know of, and their knowledge of “near-miss crashes.” Any
Item 12.
kimley-horn.com 73-700 Dinah Shore Drive, Unit 101, Palm Desert, CA 92211 760 565 5103 potential additions or changes to the recommended countermeasures, based on the feedback received during these meeting, will be discussed with the City. The group will prioritize plans for implementation and be able to review and comment on the draft and final LRSP before recommending approval of the document to be adopted by City Council.
Task 2 Deliverables:
• Stakeholder Identification List
• Technical Memo #1: Project Goals and Objectives
• Stakeholder Meetings
• Field Visit Package (crash diagrams, note sheets, site visit maps) • Field Notes
• Attendance at Traffic Advisory Committee Meetings
Task 3 – Roadway and Crash Analysis
Task 3.1 – Literature Review
We will conduct a literature review of existing plans published by the City, including the General Plan.
Documents produced by the Riverside County Transportation Commission (RCTC), Coachella Valley Association of Governments (CVAG), SCAG, and Caltrans will also be reviewed to identify projects, policies and programs that are in place or recommended that might be of value to this analysis.
Task 3.2 – Best Practices Analysis
Kimley-Horn will work with City staff to identify programs and policies within the City that are most supportive of safety, which ones could be updated to better align with current best practices, and where there are opportunities for new initiatives that would likely support safer roads and better driving behaviors. Kimley-Horn staff will collect the needed information by providing the City with a list of questions in advance, and will conduct an interview with City staff to finalize the responses.
Task 3.3 – Data Analysis
Kimley-Horn will perform a comprehensive data analysis review. Our approach to safety analysis includes statistical network screening using Highway Safety Manual Methods. These methods are selected to identify locations with higher than expected collision activity that can be reviewed to identify roadway and intersection characteristics associated with higher risk. These methods also review a variety of collision characteristics to identify locations where specific types of collisions are overrepresented. This helps to diagnose safety factors that are leading to elevated numbers of collisions.
The first screening step is to develop critical crash rates for segments and intersections in the City.
Average crash rates are developed for intersections based on control type, and roadway segments based on functional classification. A statistical threshold is then established based on daily traffic volumes for each segment and intersection. The difference between the actual crash rate and the critical crash rate for each location can then be used to estimate the relative risk faced by users of the given intersection or segment. This method builds on the High Collision or High Injury Networks that essentially mirror High Traffic networks to provide deeper insight into potential low-cost safety
Item 12.
kimley-horn.com 73-700 Dinah Shore Drive, Unit 101, Palm Desert, CA 92211 760 565 5103 measures. Roadways and intersections with lower classifications will also be identified, allowing the LRSP to broach risk factors associated with those roadways.
The second screening step focuses on crash type over-representation. City-wide data is used to determine the typical collision type mix for each of the functional classifications and intersection control types. Then the mixture is reviewed for each segment and intersection to highlight those with high concentrations of a specific collision factor. Factors analyzed would include:
• Fatal Collisions
• Fatal + Serious Injury Collisions
• Broadside Collisions
• Rear-End Collisions
• Sideswipe Collisions
• Head-On Collisions
• Single Vehicle Collisions (run off road, fixed object, parked vehicle, other) • Bicycle Collisions
• Pedestrian Collisions
• Wet/Slippery Road Collisions
• Nighttime Collisions
• Collisions Involving Alcohol/Drugs
• Collisions Involving Driver Inattention
• Collisions Involving Speeding/Aggressive Driving
The resulting list would include both the number of collisions for each factor, and the probability that any excess is not random.
Kimley-Horn will provide an inventory of sites including all roadway segments and intersections with three or more collisions (needed for statistical evaluation) ranked by overall number of collisions per Local Roadway Safety Manual Guidance. Kimley-Horn will then recommend up to ten locations for further evaluation and potential project development based on amount of collision activity, collision severity, unusual collision patterns, and site variability to maximize the potential number of systemic factors, and mitigations identified. We will identify potential conflicts between vehicles, pedestrians, and bicycles.
Task 3.4 Roadway Characteristics Inventory
Kimley-Horn will obtain available data on roadway functional classification, intersection control, schools, parks, transit stops, and other roadway characteristics that impact safety. Available traffic volume data will also be collected from the City.
Task 3.5 – Field Tour
At up to ten identified high collision locations (key corridors and intersections) identified in Task 2, field assessments with City staff will be conducted to collect additional information to better match roadway characteristics with collision activity, allowing the team to diagnose issues and develop systemic
Item 12.
kimley-horn.com 73-700 Dinah Shore Drive, Unit 101, Palm Desert, CA 92211 760 565 5103 recommendations. Deficiencies per the Highway Design Manual and other regulatory and guidance documents will be identified at these locations.
Task 3 Deliverables:
• Question List of Current Practices for City
• Technical Memorandum #2: Existing Plans and Programs
• Technical Memorandum #3: City-wide Safety Background and Trends • List of Intersection and Segments with Statistically Analyzable Collision Activity • City-wide Safety Trends and Recommended Focus Areas
• Crash Diagrams for High Crash Locations
• List of Potential Local Countermeasures
Task 4 – Develop Criteria and Identify Priority Projects & Countermeasures Task 4.1 – Develop Priority Criteria and Priority Areas Kimley-Horn will work with the City and stakeholders to develop priority criteria and identify priority areas that will be used to develop the countermeasures in Task 3.2. These countermeasures will address these priority areas and will align with State & Federal countermeasures that have been identified to assist in reducing fatal & injury collisions.
Task 4.2 – Identify Countermeasures
The identification of the potential projects will be developed by examining the crash data and determining the appropriate countermeasures improvements to roadway segments. The team will prepare a toolbox of systemic safety mitigations that can be applied citywide, or on key parts of the network.
Countermeasures will include a mixture of infrastructural improvements, educational initiatives, law enforcement strategies, emergency response, policy updates, coordination activities and other items that will contribute to the overall tapestry of roadway safety in the City. We will identify safety measures that are appropriate, cost efficient and proven effective countermeasures by the US Department of Transportation and the FHWA.
The toolbox will be developed in three steps:
1. The site visit locations will be used as case studies. Solutions that emerge from those will be associated with the conditions they are addressing and added to the toolbox.
2. The team will identify up to three safety emphasis areas for the City based on collision trends and patterns that can be looked at holistically to identify broader strategies that can be employed to address them.
3. The best practices review will be used to identify actions the City can take to improve the safety environment.
An implementation plan will be developed for inclusion in the LSRP report that will help the City prioritize improvements and identify potential funding sources while remaining responsive to funding
Item 12.
kimley-horn.com 73-700 Dinah Shore Drive, Unit 101, Palm Desert, CA 92211 760 565 5103 opportunities for HSIP and related grants, including evolving needs as plan implementation progresses.
Task 4.3 – Develop Priority Projects
Kimley-Horn will provide recommendations for operational safety improvements and develop project sheets for up to five high crash locations to improve roadway, traffic, and pedestrian safety. The sheets will profile the existing safety performance of the location, will include an aerial photo and map, and will outline potential countermeasures that had been identified through the safety analysis and workshop tasks and been approved by the City. Each countermeasure will also have a reported benefit/cost.
These sheets will provide the City with a scalable overview of the most cost-effective safety options at each location based on the level of resources available, allowing for phased implementation of multiple countermeasures, or to go straight to implementation of the most cost-effective solutions. Projects will be reviewed and recommended for available grants.
Task 4.4 – Implementation Strategy
Projects will be analyzed on their potential to reduce crash activity. Projects with the greatest and most cost-efficient crash reduction potential will be prioritized. Short-term, medium-term and longerterm projects will be identified based on their cost and likelihood of reducing crashes.
The Kimley-Horn team will work with the City to develop an action plan, and provide guidance for securing funding to address recommendations and achieve the goals and objectives identified for the local road safety plan.
This plan will also include a program for updates to the LRSP and an analysis procedure that City staff can use to update the network screening results to determine the effectiveness of countermeasures that have been implemented and to establish new priorities as existing ones are addressed and as roadway conditions and driver expectations change.
Task 4 Deliverables:
• List of Priority Criteria & Priority Areas
• Safety Countermeasure Toolbox
• Up to Five (5) Project Sheets Including List of Potential Projects • Cost estimates, mapping, and cost/benefit ratio of proposed safety improvements Task 5 – Development of Final LRSP
Task 5.1 – Draft LRSP
Kimley-Horn will prepare a Draft LRSP to document the findings of the previous tasks. The draft report will be submitted to the City for review and comment and we will assist in circulating the Draft LRSP to identified stakeholders for review. Kimley-Horn will collect a consolidated set of comments from City staff and stakeholders to refine the report into a final document.
Task 5.2 – Final LRSP
Item 12.
kimley-horn.com 73-700 Dinah Shore Drive, Unit 101, Palm Desert, CA 92211 760 565 5103 Kimley-horn will respond to all comments and incorporate feedback received on the Draft LRSP into the Final LRSP. This document will guide the City’s effort to improving transportation safety and reducing the number of incidents and the severity of those incidents on our transportation systems.
The LRSP will be a living document and analysis methods will be clearly outlined to facilitate future updates as the City completes projects, gets new collision data, as needs and priorities change, and seeks funding in future cycles after this report has reached its lifespan of up to five years per LRSP guidelines.
Kimley-Horn, along with City staff, will take the lead on plan adoption and present the Final LRSP to City Council.
Task 5 Deliverables:
• Draft LRSP
• Final LRSP
Additional Services
Any services not specifically described in the above scope, as well as any changes in the scope the Client requests, will be considered Additional Services and will be performed at our then-current hourly rates. Additional services we can provide include, but are not limited to, the following:
Additional analyses
Fee and Billing
Kimley-Horn will perform the services described in the above Tasks for a lump sum fee of $60,000 based on the following breakdown:
LABOR TASKS
Task 1: Project Management
Task 2: Stakeholder Engagement
Task 3: Crash Analysis
Task 4: Develop Criteria and Countermeasures
Task 5: Develop Local Road Safety Plan
Expenses
FEE
$4,801
$6,056
$17,345
$18,358
$12,440
$1,000
$60,000
Schedule
We will provide these services according to a mutually agreed upon schedule. Upon issuance of Notice to Proceed, we will work to complete the scope by the HSIP application deadline on September 9, 2024.
Closure
Item 12.
kimley-horn.com 73-700 Dinah Shore Drive, Unit 101, Palm Desert, CA 92211 760 565 5103 If you concur in all the foregoing and wish to direct us to proceed with the services, please return along with the appropriate contract documentation. This proposal is valid for sixty (30) days after the date of this letter.
We appreciate the opportunity to provide these services to you. Please contact me if you have any questions.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Alyssa Phaneuf, P.E.
Vice President
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
Item 12.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Andrew Simmons, P.E., City Engineer
SUBJECT: Authorization to file a Notice of Completion for pavement rehabilitation in Lewis Homes, which is a portion of Street Pavement Rehabilitation Phase 19, City Project No. ST-118.
STAFF RECOMMENDATION:
Accept the pavement rehabilitation in Lewis Homes, which is a portion of Street Pavement Rehabilitation Phase 19, City Project No. ST-118 as complete and direct the City Clerk to file a Notice of Completion attached hereto with the County of Riverside.
BACKGROUND:
On April 26,2023 City Council authorized the City Manager to execute a Maintenance of Effort Certification Statement for fiscal year 2023/2024, the Local Streets and Roads Revenue Projections, as well as, the projected five-year Measure A capital improvement plans budget for Measure A funding. The Street Pavement Rehabilitation Phase 19 Project was included in the budget and allocated $1,013.472 Measure A funds.
On October 25, 2024, the City of Coachella acted to Authorize a Construction Contract with Allied Paving Co. in the amount of $122,335 plus 15% contingency for Phase 1 of the pavement rehabilitation of Lewis Homes, Street Pavement Rehabilitation Phase 19, City Project No. ST-118.
On April 24, 2024, City Council authorized Amendment #1 for a total contract amount not-toexceed $240,081.25 for Phase 2 of the pavement rehabilitation of Lewis Homes.
DISCUSSION/ANALYSIS:
City Staff has inspected the Project and found the improvements to be in accordance with the plans, specifications, and applicable standards. Staff recommends the acceptance of this project and that the City Council authorizes the filing of a Notice of Completion.
FISCAL IMPACT:
The project was included in the City’s approved CIP FY 23/24 budget. The contract amount of $216,267 and contingency in an amount of $23,814.25 for a not to exceed amount of $240,081.25 is being funded by Measure A. Two Contract Change Orders were issued, and the project was constructed within budget including all quantities totaling $240,078.00.
Item 13.
ATTACHMENTS:
1. Notice of Completion
Item 13.
To be recorded with County Recorder
within 10 days after completion and
Acceptance. No recording fee.
When Recorded, return to:
Delia Granados, Deputy City Clerk
City of Coachella
53990 Enterprise Way
Coachella, CA 92236 (For Recorders Use)
Notice of Completion
(California Civil Code Section 3093 - Public Works)
Notice is hereby given by the undersigned owner, a political subdivision of the State of California that a public work improvement described as, pavement rehabilitation of Lewis Homes, a portion of Street Pavement Rehabilitation Phase 19, City Project No. ST-118 has been completed and was accepted by the undersigned awarding authority on the date hereof.
The contractor on such work was Allied Paving Co. and the surety on his bond is The Ohio Casualty Insurance Company located at 790 The City Drive South Suite 200, Orange, CA 92868.
The real property upon which said work was performed is in the City of Coachella, County of Riverside, and State of California.
The nature of the interest of the owner is in fee.
Date: June 12, 2024 City of Coachella
(Date of Acceptance) (Name of Political Subdivision)
Owner Address:
53990 Enterprise Way
Coachella, CA 92236
By: ________________________________
Steven A. Hernandez
Title: _________Mayor_________
State of California) City of Coachella
) ss
County of Riverside)
I hereby certify that I am the Deputy City Clerk of the governing board of the City of Coachella, the political subdivision which executed the foregoing notice and on whose behalf I make this verification; that I have read said notice, know its contents, and that the same is true. I certify under penalty of perjury that the foregoing is true and correct.
Executed at Coachella , California on (Date)
(City Where Signed)
________________________________
Delia Granados, Deputy City Clerk, City of Coachella County Counsel Form 1 (Rev. 5-64)
Item 13.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Andrew Simmons, P.E., City Engineer
SUBJECT: Amendment #2 to the Professional Service Agreement with Alta Planning + Design, Inc. in the amount of $10,000, and authorize appropriation of $10,000.00 from Fund 101 (General Fund) for Professional Engineering Services for the Connect Coachella Project, City Project ST-138.
STAFF RECOMMENDATION:
o Authorize the City Manager to execute Amendment #2 with Alta Planning + Design, Inc. in an amount of $10,000.00;
o Authorize appropriation of $10,000.00 from Fund 101 (General Fund) for Professional Engineering Services for the Connect Coachella Project, City Project ST-138.
BACKGROUND:
On June 21, 2022 the City entered into a reimbursement agreement with the Coachella Valley Mountains Conservancy (CVMC), Agreement #38500000P680017, in the amount of $200,000.
The agreement deliverables include a preliminary engineering report (PER) and state-approved CEQA clearances with 50% design drawings and project summary report for the Connecting Coachella Project (Grapefruit Boulevard Urban Greening Phase II), project No. ST-138. This will provide a complete project approval and environmental document (PA&ED) phase package. The City is actively seeking funding to complete the construction phase, a complete PA&ED package will strengthen future grant applications.
DISCUSSION/ANALYSIS:
In March 2023, City Council awarded a Professional Service Agreement to Alta Planning + Design, Inc. (Alta) to provide the PA&ED package for the Connect Coachella Project, in the amount of $240,225. This value was $40,225 above the maximum grant reimbursement. The PA&ED package is currently under review and nearly complete. City Staff has been preparing for the Active Transportation Program (ATP) Cycle 7 Grant Call for Projects expected in March 2024.
Based on ATP workshops and feedback from the California Transportation Committee (CTC) on previous applications, to provide the strongest and most complete package the City has requested Alta provide additional support services for the grant application.
Item 14.
In March 2024, City Council awarded Amendment #1 to provide additional services for the ATP grant application. These additional services included community engagement workshops and outreach events to increase the public engagement. It also provided additional maps, renderings and a project video for the grant application, as well as, extra support with the grant application in its’ entirety.
The City has requested Alta provide additional renderings to strengthen our vision for the Connect Coachella Project and reinforce our grant application. Alta has had success with the ATP grants and provided support services for many public agencies. City Staff recommends approving Amendment #2 to provide the additional services.
FISCAL IMPACT:
With this action, City Council authorizes the appropriation of $10,000.00 from Fund 101 (General Fund) to Fund 182 (CIP Project Fund). This amount includes both the value of Amendment #2.
ATTACHMENTS:
1. Cost Proposal
2. Amendment #2 – Alta Planning and Design, Inc.
Item 14.
SECOND AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT
BETWEEN THE CITY OF COACHELLA
AND ALTA PLANNING + DESIGN, INC.
THIS SECOND AMENDMENT ("Amendment") is made and entered into as of June 12th, 2024 by and between the City of Coachella ("City") and Alta Planning + Design, Inc. ("Consultant").
In consideration of the mutual covenants and conditions s et forth herein, the parties agree as follows:
1. RECITALS. This Amendment is made with the respect to the following facts and purposes:
a. On or about M a r c h 8
th
, 2023 t h e City and Consultant entered i n t o that c e r t a i n agreement entitled "City of Coachella Professional Services Agreement" between the City and Consultant to provide engineering design, and other services for the Connect Coachella Project ST-138 in the amount of $240,225.00.
b. On or about March 27th, 2024 the City and Consultant entered into the “First Amendment” to the agreement between the City and Consultant in the amount of $41,785.00. c. The parties now desire to amend the Agreement as set forth in this Amendment.
2. AMENDMENT.
3.1 General Scope of Services. Section 3.1.1 of the Agreement is hereby amended to include the additional Scope of Services to be performed for the Connect Coachella Project, ST-138 under this Amendment No. 1 referenced as EXHBIIT “A”.
3.2 Performance Period. Section 3.1.2 of the Agreement is hereby amended to go into effect on March 27, 2024 contingent upon approval by City, and Consultant shall commence work after notification to proceed by City’s Agreement Administrator. The Agreement shall end on June 30, 2024, unless extended by Agreement Amendment.
3.3 Allowable Costs and Payments. Section 3.3.1 of the Agreement is hereby amended to increase the compensation, including authorized reimbursements, for all services rendered under this Agreement as set forth in EXHIBIT “B” attached hereto and incorporated herein by reference.
The method of payment in Sections 3.3.1.A and B of the Agreement are hereby amended to actual cost plus a ten percent (10%) fixed fee. City will reimburse Consultant for actual costs (including labor costs, employee benefits, travel, equipment rental costs, overhead and other direct costs; plus ten percent fixed fee) incurred by Consultant in performance of the work. The total authorized compensation for the Amendment No. 2 is
Item 14.
in the amount not to exceed Ten Thousand Dollars and Zero Cents ($10,000.00).
The amended total compensation shall not exceed Two Hundred Eighty-Two Thousand Ten Dollars and Zero Cents ($282,010.00) without written approval of the City’s representative. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this agreement.
3.4 Continuing Effect of Agreement. Except as amended by this Amendment, all provisions of the Agreement shall remain unchanged and in full force and effect. From and after the date of this Amendment, whenever the term "Agreement" appears in the Agreement, itshall mean the Agreement as amended by this Amendment.
3.5 Adequate Consideration . The parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment.
3.6 Counterparts. This Amendment m a y be executed in duplicate originals, each of which is deemed to be an original, but when taken together shall constitute but one and the same instrument.
IN WITNESS THEREOF, the parties have executed this Amendment as of the day and year first set forth above, which date shall be considered by the parties to be the effective date of this Amendment.
CITY OF COACHELLA ALTA PLANNING + DESIGN, INC.
By:____________________________ By:_________________________ Gabriel Martin Name
City Manager Title
By: ________________________________
Carlos Campos, City Attorney
Attest: ___________________________________
Angela Zepeda, City Clerk
Item 14.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Maritza Martinez, Public Works Director
SUBJECT: Authorize City Manager to approve Notice of Completion for City Project No.
LL-03-021323, accept project as complete and direct City Clerk to record the Notice of Completion..
STAFF RECOMMENDATION:
Authorize City Manager to approve Notice of Completion for City Project No. LL-03-021323, accept project as complete and direct City Clerk to record the Notice of Completion.
EXECUTIVE SUMMARY:
The City published a Request for Bids Tierra Del Sol Decorative Lighting Improvements Project LL-03-021323. This bid closed on April 20, 2023 and the City received three responses. On May 10, 2023, the project was awarded to Desert Concepts Construction in the amount of $541,480.00.
The bid improvements have provided decorative lighting to all five entrances to the Tierra Del Sol residential community. Desert Concepts Construction has completed its responsibilities on the project. This project was completed at the awarded amount and has no change orders. Staff recommends that their work be accepted as complete and that the City Council authorize the filing of a Notice of Completion.
FISCAL IMPACT:
The recommended action will not have a fiscal impact.
Attachments:
Notice of Completion
Item 15.
To be recorded with County Recorder
within 10 days after completion and
Acceptance. No recording fee.
When Recorded, return to:
Delia Granados, Deputy City Clerk
City of Coachella
53462 Enterprise Way
Coachella, CA 92236 (For Recorders Use)
Notice of Completion
(California Civil Code Section 3093 - Public Works)
Notice is hereby given by the undersigned owner, a political subdivision of the State of California that a public work improvement described as:
Tierra Del Sol Decorative Entrance Lighting Improvements, City Project No. LL-03-021323 has been completed and was accepted by the undersigned awarding authority on the date hereof.
Decorative lighting improvements have been installed and energized.
The contractor on such work was Desert Concept Construction and the surety on his bond is Merchants Bonding Company (Mutual) located at P.O. Box 14498, Des Moines, Iowa 50306-3498. The real property upon which said work was performed is in the City of Coachella, County of Riverside, and State of California.
The nature of the interest of the owner is in fee.
Date: June 12, 2024 City of Coachella
(Date of Acceptance) (Name of Political Subdivision)
Owner Address:
53462 Enterprise Way
Coachella, CA 92236
By:________________________________
Gabriel D. Martin, Ph. D
Title: _________City Manager________
I hereby certify that I am the Deputy City Clerk of the governing board of the City of Coachella, the political subdivision which executed the foregoing notice and on whose behalf I make this verification; that I have read said notice, know its contents, and that the same is true. I certify under penalty of perjury that the foregoing is true and correct.
Executed at Coachella , California on June 12, 2024
(City Where Signed)
________________________________
Delia Granados, Deputy City Clerk, City of Coachella County Counsel Form 1 (Rev. 5-64)
Item 15.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Maritza Martinez, Public Works Director
SUBJECT: Award Amendment No. 3 to construction agreement with WGJ Enterprises Inc. (dba PCI) for the FY 2023-26 On-Call Striping Contract Project No. 083122 to extend their term through June 30, 2025 and compensation to increase by a not to exceed amount of $125,000.
STAFF RECOMMENDATION:
Award Amendment No. 3 to construction agreement with WGJ Enterprises Inc. (dba PCI) for the FY 2023-26 On-Call Striping Contract Project No. 083122 to extend their term through June 30, 2025 and compensation to increase by a not to exceed amount of $125,000.
EXECUTIVE SUMMARY:
The City published a Request for Proposals (“RFP”) for on-call striping services for fiscal years 2023-2026. This RFP closed on October 4, 2022 at 2pm. The City received one responsive and responsible proposal from WGH Enterprises Inc. and the City awarded the RFP to WGH Enterprises Inc. The services provided through this contract will address annual maintenance of city major and minor arterials. Staff is requesting the awarded term be extended through the upcoming fiscal year (June 30, 2025).
FISCAL IMPACT:
The recommended action will not have a fiscal impact.
Attachments:
Proposed Amendment
Item 16.
CONTRACTOR AGREEMENT – AMENDMENT NO 3
This Contract for Construction (“Contract”), is made and entered into this 12th day of June, 2024, by and between City of Coachella, a municipal corporation, organized under the laws of the State of California, with its principal place of business at 53462 Enterprise Way, Coachella, California 92236, sometimes hereinafter called the “City” and WGJ Enterprises Inc., dba PCI, sometimes hereinafter called “Contractor.”
WITNESSETH: That the parties hereto have mutually covenanted and agreed, and by these presents do covenant and agree with each other as follows:
ARTICLE 1. SCOPE OF WORK.
The Contractor shall perform all Work within the time stipulated in the Contract, and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5, below, for the following Project:
FY 2023-26 On-Call Striping Contract
CITY PROJECT NO. 083122
Contractor is an independent contractor and not an agent of the City. The Contractor and its surety shall be liable to the City for any damages arising as a result of the Contractor’s failure to comply with this obligation.
ARTICLE 2. TERM.
The term of this Amended Agreement shall commence on the 1 st day of November 2022, and
shall terminate on the 30
th day of June 2025, unless terminated earlier as set forth herein.
This Agreement may be mutually extended for up to three additional one-year terms, through fiscal year 2025/2026, upon satisfactory performance of all aspects of this Agreement. The City may submit written notice that the Agreement is to be extended at the same terms and compensation as the existing Agreement.
Contractor and City agree that time is of the essence regarding the performance of this Agreement. All work called for under this Agreement will require the Contractor submit and City approve a Project Schedule for completion of work requested.
ARTICLE 3. CONTRACT PRICE.
The City shall pay to the Contractor as full compensation for the performance of the Contract, subject to any additions or deductions as provided in the Contract Documents, and including all applicable taxes and costs, the not to exceed sum of One Hundred Twenty Thousand Dollars ($120,000.00) for FY 2022-2023 and One-Hundred Fifty Thousand Dollar ($150,000.00) for FY 2023-24 and FY 2024-25 ($125,000.00).. Payment shall be made as set forth in the General Conditions. The City will pay to Contractor compensation based upon the prices set forth in the Proposal Schedule.
Item 16.
ARTICLE 4. LIQUIDATED DAMAGES.
Contractor acknowledges that the City will sustain actual damages for each and every Working Day completion of the Project is delayed beyond the Contract Time (per approved Project Schedule). Because of the nature of the Project, it would be impracticable or extremely difficult to determine the City’s actual damages. Accordingly, in accordance with Government Code section 53069.85, it is agreed that the Contractor will pay the City the sum of $500.00 for each and every Working Day of delay beyond the time prescribed in the Contract Documents. In the event this is not paid, the Contractor agrees the City may deduct that amount from any money due or that may become due the Contractor under the Contract. This Section does not exclude recovery of other damages specified in the Contract Documents. Liquidated damages may be deducted from progress payments due Contractor, Project retention or may be collected directly from Contractor, or from Contractor's surety. These provisions for liquidated damages shall not prevent the City, in case of Contractor's default, from terminating the Contractor.
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT.
The “Contract Documents” include the following:
Notice Inviting Bids
Instructions to Proposers
ProposalForms
ProposalAcknowledgement
ProposalSchedule
ProposalGuarantee
Designation of Subcontractors
Information Required of Proposers
Non-Collusion Declaration Form
Iran Contracting Act Certification
Drug-Free Workplace Certification
Asbestos-Free Material Certification
Recycled Content Certification
Public Works Contractor DIR Registration Certification
Performance Bond
Payment (Labor and Materials) Bond
Contract for Construction
General Conditions
Special Conditions
Technical Specifications
Addenda
Construction Plans and Drawings
City of Coachella Standard Specifications and Procedures (June 2007) City of Coachella Standard Infrastructure Drawings (2007 Edition) including Surface Improvement Standards and Water Standards
Standard Specifications for Public Works Construction “Greenbook” (2018), Except Sections 1-9
Standard Plans for Public Works Construction “Greenbook” (2018) Caltrans Standard Specifications (2018), except Division 1 Caltrans Standard Plans (2018)
Applicable Local Agency Standards and Specifications, as last revised Reference Specifications
Item 16.
Approved and fully executed Change Orders
Permits
Any other documents contained in or incorporated into the Contract The Contractor shall complete the Work in strict accordance with all of the Contract Documents.
All of the Contract Documents are intended to be complementary. Work required by one of the Contract Documents and not by others shall be done as if required by all. In the event of conflict, the various Contract Documents will be given effect in the order set forth in the General Conditions. This Contract shall supersede any prior agreement of the parties.
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE.
Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.
ARTICLE 7. INDEMNIFICATION.
Contractor shall provide indemnification and defense as set forth in the General Conditions.
ARTICLE 8. PREVAILING WAGES.
Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code which such rates may be obtained online at http://www.dir.ca.gov and which must be posted at the job site.
ARTICLE 9. FALSE CLAIMS.
Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud and Contractor may be subject to criminal prosecution. Contractor acknowledges that the False Claims Act, California Government Code sections 12650, et seq., provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include within their scope false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. In the event the City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorneys’ fees. Contractor hereby acknowledges that the filing of a false claim may the Contractor to an administrative debarment proceeding wherein Contractor may be prevented from further bidding on public contracts for a period of up to five (5) years. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Item 16.
IN WITNESS WHEREOF, this Contract has been duly executed by the above-named parties, on the day and year above written.
CITY OF COACHELLA
By:
Gabriel D. Martin, PhD
City Manager
ATTEST:
By:
Angela M. Zepeda, City Clerk
APPROVED AS TO FORM:
By:
Best Best & Krieger LLP
City Attorney
WGJ ENTERPRISES INC., DBA PCI
By:
Its:
Printed
Name:
By:
Its:
Printed
Name:
____________________________________
Contractor’s License Number and
Classification
____________________________________
DIR Registration Number
Item 16.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Maritza Martinez, Public Works Director
SUBJECT: Award Amendment No. 1 to Vintage Associates, Inc for Landscape Maintenance Services for Grapefruit Blvd Medians and Parkway Project No. 121421; increasing term of agreement by one year and compensation by $67,620.
STAFF RECOMMENDATION:
Award Amendment No. 1 to Vintage Associates, Inc for Landscape Maintenance Services for Grapefruit Blvd Medians and Parkway Project No. 121421; increasing term of agreement by one year and compensation by $67,620.
EXECUTIVE SUMMARY:
The City published a Request for Proposals (“RFP”) for Landscape Maintenance Services for Grapefruit Blvd Medians and Parkway. This RFP closed on January 12, 2022 and in February 2022 was awarded to Vintage Associates, Inc. The original award was for a two-year term for $135,240.00.
Staff recommends awarding Vintage Associates, Inc Amendment No. 1 increasing their term for one additional year at the same annual rate. Thus, if awarded Amendment No. 1 would increase the contract amount to $202,860; an increase of $67,620 for the additional one-year term extension.
FISCAL IMPACT:
The recommended action will not have a fiscal impact as it is budgeted in the existing budget.
Attachments:
Proposed Agreement
Item 17.
1 ORANGE\CCAMPOS\34530. 2 BBK: MARCH 2007
Amendment No. 1 to the Maintenance Services Agreement
Between the City of Coachella
and
Vintage Landscape Project No. 121421
2. Parties And Date.
This Amendment No. 1 to the Maintenance Services Agreement ("Amendment No.1 ") is made and entered into this 12th day of June, 2024 by and between the City of Coachella ("City") and Vintage Landscape, ("Contractor"). City and Contractor are sometimes individually referred to as "Party" and collectively as "Parties" in this Amendment No.1.
2. Recitals.
2.2 Agreement. City and Contractor entered into that certain Agreement for Landscape Maintenance Service for Grapefruit Blvd Median and Parkway Project No. 121421 ("Agreement"), entered into on February 9, 2022.
2.2 Amendment. City and Contractor desire to amend the Agreement for the first time to amend the term of the Agreement as set forth in this Amendment No. 1.
3. Amendments.
3.1. Compensation. Section 3.1.2 and 3.3.1, of the Agreement are hereby deleted in their entirety and replaced with the following:
3.1.2 Term. The term of the Agreement shall be from February 14, 2022 to February 13, 2025, unless earlier terminated as provided herein. The City shall have the unilateral option, at its sole discretion, to renew this Agreement automatically for no more than two additional one-year terms. Contractor shall complete the Services within the term of the Agreement, and shall meet any other established schedules and deadlines. The Parties may be mutual written consent extend the term of this Agreement if necessary to complete the Services
3.3.1 Compensation. Contractor shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit ”C” attached hereto and incorporated herein by reference. The total compensation shall not exceed two-hundred two thousand and eight hundred sixty dollars and zero cents ($202,860.00) without written approval of City’s City Council. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.
3.2 Exhibit C. Exhibit C are hereby deleted and replaced with a revised Exhibit C attached hereto.
3.3 Continuing Effect of Agreement. Except as amended by this Amendment No.1, all provisions of the Agreement shall remain unchanged and in full force and effect. From and after the date of this Amendment No.1, whenever the term "Agreement" appears in the Agreement, it shall mean the Agreement as amended by this Amendment No.1.
Item 17.
2 ORANGE\CCAMPOS\34530. 2 BBK: MARCH 2007
3.4 Adequate Consideration. The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No.1.
3.5 Counterparts. This Amendment No.1 may be executed in duplicate originals, each of which is deemed to be an original, but when taken together shall constitute but one and the same instrument.
IN WITNESS WHEREOF, the parties have executed this Amendment. No. 1 as of the date first written above.
THE CITY OF COACHELLA VINTAGE LANDSCAPE
By:
_____________________________ By:__________________________ Dr. Gabriel D. Martin
City Manager
Attest:
____________________________
City Clerk
Approved as to Form:
____________________________
Carlos Campos, City Attorney
Item 17.
3 ORANGE\CCAMPOS\34530. 2 BBK: MARCH 2007
Item 17.
4 ORANGE\CCAMPOS\34530. 2 BBK: MARCH 2007
EXHIBIT “C”
COMPENSATION
Monthly = $4,900.00
Annual = $58,800.00
Three Year Term plus 15% contingency = $202,860.00
Item 17.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Jaime Arroyo, Grants Manager
SUBJECT: Authorize a Community-Based Grant to the Palm Springs Art Museum in the Amount of $1,500 to Fund Transportation for their Family+ Program STAFF RECOMMENDATION:
Staff recommends that the City Council consider awarding a Community-Based Grant (CBG) to the Palm Springs Art Museum in the amount of $1,500 to fund transportation for their Family+ Program.
BACKGROUND:
The Community Based Grant Program was established in 2010 and allows the City of Coachella to offer financial assistance to local nonprofit organizations, youth-serving organizations, and other community-based organizations that provide essential services, programs and activities to residents in Coachella. Applicant organizations are only eligible to submit one application for consideration each fiscal year and must be legally established with non-profit or tax-exempt status, be based in the Coachella Valley, or provide direct service to Coachella residents. Approval of grant funds does not constitute a precedent for grant allocations in subsequent years. All CBG grants are reimbursement grants to ensure that applicants are meeting their stated goals. The FY 23-24 budget included an allocation of $15,000 for the Community Based Grant Program.
DISCUSSION/ANALYSIS:
The Palm Springs Art Museum was founded in 1938. The museum has 28 galleries, two sculpture gardens, four classrooms, resource centers, five storage vaults, and a 433-seat theater.
As part of their Public Programming offerings, every third Sunday, Family+ offers families free workshops and activities, hosted by different artists, creatives, makers, and musicians. For the May 18th offering of Family+, the Palm Springs Art Museum arranged a charter bus to transport families from the Mecca and Coachella Library to and from the museum. This provided a great benefit to those families who face transportation and/or financial challenges. The funding request is to cover expenses related to the charter bus rental.
Item 18.
ALTERNATIVES:
1. Award a Community Based Grant in the amount of $1,500.
2. Do not award a Community Based Grant
FISCAL IMPACT:
Should the City Council approve the staff recommendation, the Community-Based Grant Program account will be reduced by $1,500.
ATTACHMENT(S):
CBG Application Packet
Item 18.
CITY OF COACHELLA, CA
COMMUNITY BASED GRANT PROGRAM
APPLICATION FOR FUNDS REQUEST
Please Type Information and Print
Information entered in the provided spaces cannot be saved. (Attach additional pages as needed, however applicants are encouraged to be brief.)
1. Application Funding Cycle: Date:
July 1, 20 - June 30, 20
2. Total Amount Requested: $
If requesting waiver of City fees or charges, please indicate the City service for which the waiver is being requested.
3. Proposed Program/Service of Funding Request:
4. Agency/Organization:
5. Mailing Address:
City: Zip:
6. Telephone:
Fax:
7. Official Contact Person:
Name:
Title:
Telephone:
Fax:
E-mail:
05/09/2024
23 24
1,500
Palm Springs Art Museum
101 N Museum Drv
Palm Spri 92262
(760) 322-4844
Daniela Rojas
Public Programs and Learning Manager
(760) 322-4844
[email protected]
Transport for Family+ at Palm Springs Art Museum
Item 18.
8. Does this organization have a non-profit status with the Internal Revenue Service (IRS)? Yes No (Attach documentation)
9. How long has this organization been in existence?
10. Has the organization previously received funding from the City of Coachella? Yes No
If yes, please identify the program/service, total prior grant allocation, and the fiscal year in which the funds were received.
11. Is this request for a New or Existing program/service within the City?
12. What is the anticipated time frame to provide the proposed program/service and the expenditure of the requested funds?
13. Describe briefly how the requested funds will be used.
14. Will the program/service require additional funding sources? If so, identify all funding sources and provide the steps taken to acquire funding.
15. If the program/service is planned to continue beyond the period provided by this grant, what funding plans are there to sustain the program/service?
16. How will the proposed program/service serve City of Coachella residents? Will the proposed program/service also serve non-Coachella residents? Please describe.
17. Describe the characteristics of the clients the proposed program/service anticipates to serve (i.e. age group, gender, income level, ethnicity, etc.)
18. Attach a proposed budget for requested funds.
Authorized Official: Title:
Signature: Date: 5/9/24
✔
✔
✔
Over 50 years
approximately $1,200
Shuttle service to the museum will be on May 18 ,2024.
Funds will be used to cover fees for a charter bus to transport community members from Coachella Library and Mecca Library to and from the museum for a free community event. no
The museum will cover the program costs($9,000) associated with Art in the Library; materials and supplies, program coordinator, art workshop hosts.
This service will provide Coachella and non-Coachella residents to access to Palm Springs Art Museum who face transportation and/or financial challenges.
Family+ at Palm Springs Art Museum is open for families and community members of all shapes and sizes. Activities and museum admission are free and accessible to all ages during this event.
Item 18.
Library Program Spring 2024
Palm Springs Art Museum hosts Family+ every third Sunday of the month where we host community members from 12pm-4pm for various workshops and activities led by local and regional artists. Family+ is free for everyone and includes museum admission.
Community members are invited to create art, explore a new medium, and engage with the museums art collection.
In previous years Palm Springs Art Museum partnered with local libraries to provide art boxes for community members to try new art activities with their families and introduce them to museum events and invite them to monthly Family+ program. This year the education team at Palm Springs Art Museum brought Family+ to three Coachella Valley libraries through Art in the Library. Community participants were introduced to Family+ and learned about three different art mediums and about the various events the museum hosts.
Workshops were hosted this spring to invite community members to our Family+ on May 18th, 2024 at Palm Springs Art Museum.
Coachella Library- May 1st 2024 – 36 attendance
Desert Hot Springs- May 2nd 2024 – 18 attendance
Mecca Library- May 4th 2024 – 17 attendance
Item 18.
Library Program Budget
Public Programs and Learning Manager Salaried
Program Coordinator - contractor
- Planning
- Event execution
- Final report
$2,000
Art Educator (1)- 3workshops $1,500
Art Educator (2)- 3 workshops $1,500
Art Educator (3)- 3 workshops $1,500
Supplies $380
Printing and marketing $150
Mileage- museum staff $120
Charter bus- community transportation $1500
Total $8,650
Palm Springs Art Museum total
contribution
$7,150
Community Partner(Asking) $1,500
Item 18.
Item 18.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Jaime Arroyo, Grants Manager
SUBJECT: Authorize a Community-Based Grant to the Read with Me Book Donation Program in the Amount of $2,000 to Purchase and Distribute Books to Five Coachella Elementary Schools
STAFF RECOMMENDATION:
Staff recommends that the City Council consider awarding a Community-Based Grant (CBG) to the Read with Me Book Donation Program in the amount of $2,000 to purchase and distribute books to five Coachella elementary schools.
BACKGROUND:
The Community Based Grant Program was established in 2010 and allows the City of Coachella to offer financial assistance to local nonprofit organizations, youth-serving organizations, and other community-based organizations that provide essential services, programs and activities to residents in Coachella. Applicant organizations are only eligible to submit one application for consideration each fiscal year and must be legally established with non-profit or tax-exempt status, be based in the Coachella Valley, or provide direct service to Coachella residents. Approval of grant funds does not constitute a precedent for grant allocations in subsequent years. All CBG grants are reimbursement grants to ensure that applicants are meeting their stated goals. The FY 23-24 budget included an allocation of $15,000 for the Community Based Grant Program.
DISCUSSION/ANALYSIS:
The 20-year-old Read with Me Volunteer Program helps children from low income, limited English speaking environments develop to their fullest potential by learning to read, comprehend and speak English. They do this through recruiting and training more than 600 volunteers to work with elementary school children in their classrooms, and to provide nearly 33,000 books to 11,500 children in 20 schools. The program focuses on giving books tailored specifically to the needs of our struggling students, with a strong emphasis on diversity, equity and inclusion. This funding will help in providing books for 750 children from the following Coachella schools: Cesar Chavez Elementary, Palm View Elementary, Peter Pendleton Elementary, Valle Del Sol Elementary, and Valley View Elementary.
Item 19.
ALTERNATIVES:
1. Award a Community Based Grant in the amount of $2,000.
2. Do not award a Community Based Grant.
FISCAL IMPACT:
Should the City Council approve the staff recommendation, the Community-Based Grant Program account will be reduced by $2,000.
ATTACHMENT(S):
CBG Application Packet
Item 19.
$2,000
Item 19.
Item 19.
READ WITH ME VOLUNTEER PROGRAMS
COACHELLA BOOK DISTRIBUTION PROJECT
2023-24 SCHOOL YEAR
BUDGET
SCHOOL # books distribution postage
Cesar Chavez 150 ($ 200.00) ($ 250.00)
Palm View 150 ($ 200.00) ($ 250.00)
Peter Pendleton 150 ($ 200.00) ($ 250.00)
Valle Del Sol 150 ($ 200.00) ($ 250.00)
Valley View 150 ($ 200.00) ($ 250.00)
Total Books 750
Total $5,250) $1,000) $1,250)
$7,500)
Item 19.
Item 19.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Jaime Arroyo, Grants Manager
SUBJECT: Authorize a Community-Based Grant to Seiden-Juku in the Amount of $1,000 to Help Fund Coachella Valley’s First Annual Para-Karate Tournament STAFF RECOMMENDATION:
Staff recommends that the City Council consider awarding a Community-Based Grant (CBG) to Seiden-Juku in the amount of $1,000 to help fund Coachella Valley’s First Annual Para-Karate Tournament.
BACKGROUND:
The Community Based Grant Program was established in 2010 and allows the City of Coachella to offer financial assistance to local nonprofit organizations, youth-serving organizations, and other community-based organizations that provide essential services, programs and activities to residents in Coachella. Applicant organizations are only eligible to submit one application for consideration each fiscal year and must be legally established with non-profit or tax-exempt status, be based in the Coachella Valley, or provide direct service to Coachella residents. Approval of grant funds does not constitute a precedent for grant allocations in subsequent years. All CBG grants are reimbursement grants to ensure that applicants are meeting their stated goals. The FY 23-24 budget included an allocation of $15,000 for the Community Based Grant Program.
DISCUSSION/ANALYSIS:
Seiden-Juku’s mission is to build leaders in inclusion and diversity through the art of karate-do.
Their programs include inclusive classes centered on teaching karate to special needs children and adults, children in foster care, and children survivors of abuse. Currently, they are producing Coachella Valley’s First Annual Para-Karate Tournament, which will take place at Rancho Mirage High School on July 13, 2024. This event will be a groundbreaking opportunity for individuals with disabilities to compete and showcase their skills in para-karate. The tournament will directly benefit 14 students who are residents of the City of Coachella. Funding will help cover the cost of the venue fees.
Item 20.
ALTERNATIVES:
1. Award a Community Based Grant in the amount of $1,000.
2. Do not award a Community Based Grant
FISCAL IMPACT:
Should the City Council approve the staff recommendation, the Community-Based Grant Program account will be reduced by $1,000.
ATTACHMENT(S):
CBG Application Packet
Item 20.
CITY OF COACHELLA, CA
COMMUNITY BASED GRANT PROGRAM
APPLICATION FOR FUNDS REQUEST
Please Type Information and Print
Information entered in the provided spaces cannot be saved. (Attach additional pages as needed, however applicants are encouraged to be brief.)
1. Application Funding Cycle: Date:
July 1, 20 - June 30, 20
2. Total Amount Requested: $
If requesting waiver of City fees or charges, please indicate the City service for which the waiver is being requested.
3. Proposed Program/Service of Funding Request:
4. Agency/Organization:
5. Mailing Address:
City: Zip:
6. Telephone:
Fax:
7. Official Contact Person:
Name:
Title:
Telephone:
Fax:
E-mail:
5/31/2024
24 24
1,000.00
Seiden - Juku
81-842 Thoroughbred Trail
La Quinta 92253
(760) 625-8381
Tamara R. Canedo
Sensei & CEO
(760) 625-8381
[email protected]
Seiden-Juku is seeking funding to support Coachella Valley's First Annual Para-Karate Tourn
Item 20.
8. Does this organization have a non-profit status with the Internal Revenue Service (IRS)? Yes No (Attach documentation)
9. How long has this organization been in existence?
10. Has the organization previously received funding from the City of Coachella? Yes No
If yes, please identify the program/service, total prior grant allocation, and the fiscal year in which the funds were received.
11. Is this request for a New or Existing program/service within the City?
12. What is the anticipated time frame to provide the proposed program/service and the expenditure of the requested funds?
13. Describe briefly how the requested funds will be used.
14. Will the program/service require additional funding sources? If so, identify all funding sources and provide the steps taken to acquire funding.
15. If the program/service is planned to continue beyond the period provided by this grant, what funding plans are there to sustain the program/service?
16. How will the proposed program/service serve City of Coachella residents? Will the proposed program/service also serve non-Coachella residents? Please describe.
17. Describe the characteristics of the clients the proposed program/service anticipates to serve (i.e. age group, gender, income level, ethnicity, etc.)
18. Attach a proposed budget for requested funds.
Authorized Official: Title:
Signature: Date:
✔
✔
✔
Four years.
The proposed time frame for providing the Coachella Valley's First Annual Para-Karate Tournament is a one-day event scheduled for July 13th, 2024. To date, the venue has been secured, and athletes have pre-registered. Seiden-Juku has secured one Gold Sponsor at The requested funds will be used to cover the cost of key items for the Coachella Valley's First Annual Para-Karate Tournament. Specifically, the funds will be allocated to:
1. Facility Setup: Arranging the venue to ensure it is properly equipped and prepared for all participants, volunteers, and attendees, including seating, equipment, and accessibility Yes, the program requires additional funding sources. Seiden-Juku has created a sponsorship packet and is seeking:
- Presenting Sponsor: $5,000
- Gold Sponsor: $2,500 (secured)
Coachella Valley’s Annual Para-Karate Tournament will continue yearly and grow with Seiden-Juku’s student base. Seiden-Juku provides year-round para-karate training, and the tournament will both showcase student skills and help fund ongoing instruction for over 50 para-athletes.
The Coachella Valley’s first annual para-karate tournament will directly benefit 14 students who are residents of the City of Coachella, making up 35% of the participants. Additionally, 26 students from other Coachella Valley cities will also participate, fostering regional inclusivity and community engagement.
The program serves a diverse group of students:
- Gender: 60% female, 40% male
- Ethnicity: Over 70% Hispanic
Tamara Canedo Sensei & CEO
Item 20.
SEIDEN-JUKU'S 1ST ANNUAL PARA-KARATE TOURNAMENT
Cost Discription: Fee:
Rancho Mirage Venue Gym $ 600.00
Janitor $ 500.00
Insurance $ 250.00
Security $ 1,000.00
Doctor for the day $ 500.00
Flags $ 100.00
PAPA HEADZ $ 125.00
Tables and chairs $ 100.00
Snack Bar $ 200.00
Office Supplies $ 200.00
Volunteer Shirts $ 300.00
Medals $ 1,000.00
Total cost: $ 4,875.00
Item 20.
Item 20.
STAFF REPORT
6/12/2024
TO: Honorable Mayor and City Council Members
FROM: Andrew Simmons, P.E., City Engineer
SUBJECT: Adopt Resolution 2024-20, a Resolution of the City Council of the City of Coachella, California, adopting a pavement management report dated May 2024.
STAFF RECOMMENDATION:
Authorize the City Manager to adopt Resolution 2024-20, a Resolution of the City Council of the City of Coachella, California, adopting a pavement management report dated May 2024.
BACKGROUND:
Staff published a request for qualifications for on-call engineering services and received 21 responses. On January 25, 2023 the City Council authorized the City Manager to qualify and execute Professional Service Agreements for on-call engineering services with eight (8) firms, including Michael Baker. The qualified firms were evaluated and Michael Baker was selected based on certified and advanced pavement data collection technologies and capability to provide deliverables efficiently.
The City’s Pavement Management System (PMS) was last updated in 2016. An updated report is needed to account for street improvements that have been completed since then and the wear and tear over the years. The PMS is utilized for pavement management decisions when planning and budgeting for future street projects. The deliverables included a pavement condition database, street network GIS map and a Pavement Management Report.
DISCUSSION/ANALYSIS:
The citywide pavement condition evaluation was conducted in November 2023, and the results show that the average Pavement Condition Index (PCI) of the City’s roads is 63.4 out of 100, corresponding to a “Fair” condition rating. The 10-year investment scenario forecasting analyses suggest that the City would need to invest an average of $4.6 million annually to maintain a network average PCI of 63.4.
This report includes details about the methodology used for pavement evaluations, pavement management system implementation details, and the results of six 10-year investment scenario forecasting analyses that the City can use to prepare informed pavement maintenance and rehabilitation projects.
Item 21.
FISCAL IMPACT:
No fiscal impact to FY 22/23 budget. Funds have been budgeted for on-call professional services and costs are within budget.
ATTACHMENTS:
1. Resolution 2024-20
2. Final Pavement Management Report
Item 21.
RESOLUTION NO. 2024-20
A RESOLUTION OF THE CITY OF COACHELLA, CALIFORNIA,
ADOPTING A PAVEMENT MANAGEMENT REPORT DATED MAY 2024
WHEREAS; the City of Coachella has established criteria for a Pavement Management Report to monitor the condition of and perform periodic maintenance and rehabilitation of streets; and
WHEREAS; the City of Coachella established a Pavement Condition Index (PCI) for residential and arterial streets and recommends pavement strategies for the City’s street network system; and
WHEREAS; the City of Coachella conducted an inventory of arterial, residential and collector routes, assessed pavement conditions of said routes, and identified pavement sections needing rehabilitation or replacement through the City’s Capital Improvement Program (CIP); and WHEREAS; the City of Coachella adopts the Final Pavement Management Report Dated May 2024;
PASSED, APPROVED and ADOPTED this 12th day of June 2024. ___________________________________
Steven A. Hernandez
Mayor
ATTEST:
___________________________________
Angela M. Zepeda
City Clerk
APPROVED AS TO FORM:
___________________________________
Carlos Campos
City Attorney
Item 21.
Resolution No. 2024-20
STATE OF CALIFORNIA
COUNTY OF RIVERSIDE
CITY OF COACHELLA
)
) ss.
)
I HEREBY CERTIFY that the foregoing Resolution No. 2024-20 was duly adopted by the City Council of the City of Coachella at a regular meeting thereof, held on the 12th day of June, 2024, by the following vote of Council:
AYES:
NOES:
ABSENT:
ABSTAIN:
___________________________________
Delia Granados
Deputy City Clerk
Item 21.
Pavement Management Report
THE CITY OF COACHELLA, CA
Submitted: May 2024
Michael Baker International, Inc.
75-410 Gerald Ford Drive, Suite 100 | Palm Desert, CA 92211
Item 21.
SECTION PAGE
1.0 EXECUTIVE SUMMARY 1
2.0 METHODOLOGY 2
2.1 Pavement Management Principles 2
2.2 Pavement Data Collection Approach 3
3.0 FINDINGS 5
3.1 Current Inventory 5
3.2 Current Condition 6
4.0 PAVEMENT MANAGEMENT SYSTEM IMPLEMENTATION 7
4.1 GIS Mapping 7
4.2 Maintenance and Rehabilitation Records 8
4.3 Deterioration Curves 8
4.4 Maintenance Activities 10
4.5 Maintenance Policy 11
4.6 AtlasView Public Dashboard 12
5.0 PAVEMENT MANAGEMENT ANALYSIS 13
5.1 Scenario 1: Unlimited Budget 13
5.2 Scenario 2: Backlog Elimination 15
5.3 Scenario 3: Do Nothing 17
5.4 Scenario 4: Maintain Current Condition 19
5.5 Scenario 5: Reach PCI of 70 21
5.6 Scenario 6: Current Budget 23
6.0 RECOMMENDATIONS 25
TABLE OF CONTENTS
Pavement Management Report | i
Item 21.
SECTION
APPENDIX A - Road Inventory with 2023 Inspection
APPENDIX B - Work Plan for Scenario 1: Unlimited Budget APPENDIX C - Work Plan for Scenario 2: Backlog Elimination APPENDIX D - Work Plan for Scenario 4: Maintain Current Condition APPENDIX E - Work Plan for Scenario 5: Reach PCI of 70
APPENDIX F - Work Plan for Scenario 6: Current Budget
APPENDICES
Pavement Management Report | ii
Item 21.
Pavement Management Report | 1
1.0 EXECUTIVE SUMMARY
The City of Coachella, CA (City) contracted Michael Baker International, Inc. (Michael Baker) to perform a detailed pavement condition evaluation of the City’s roadway network and implement a modern and updated pavement management system. The project included evaluating the pavement condition of the City’s approximately 140 miles of roadways, implementing the AtlasView pavement management system with updated roadway details and conditions, and performing various 10- year scenario forecasting analyses to evaluate the impacts of different infrastructure maintenance investment strategies. The project also included the deployment of the AtlasView Public Dashboard to facilitate transparency by enabling residents to have real-time access to the City’s roadway network condition information.
The citywide pavement condition evaluation was conducted in November 2023, and the results show that the average Pavement Condition Index (PCI) of the City’s roads is 63.4 out of 100, corresponding to a “Fair” condition rating. The 10-year investment scenario forecasting analyses suggest that the City would need to invest an average of $4.6 million annually to maintain a networkaverage PCI of 63.4.
This report includes details about the methodology used for pavement evaluations, pavement management system implementation details, and the results of six 10-year investment scenario forecasting analyses that the City can use to prepare informed pavement maintenance and rehabilitation projects
Item 21.
Pavement Management Report | 2
2.0 METHODOLOGY
2.1 Pavement Management Principals
Roadway networks are one of the most critical infrastructure assets that municipal agencies manage because roads facilitate transportation, making them vital to the local and regional economy. As municipalities such as the City of Coachella experience population growth, the demand on their roadway network also grows. However, many municipal agencies do not have sufficient funds to maintain their full roadway network in a state of good repair. Often, these municipal agencies focus their maintenance and rehabilitation activities on those segments of the roadway network that are in the worst condition. Unfortunately, this “worst-first” maintenance strategy falls short of improving the network-level condition because the majority of available funds are invested in expensive rehabilitation and reconstruction projects for only a few roads.
Modern pavement management systems focus on optimizing maintenance and rehabilitation investments across entire roadway networks with the goal of maximizing the average pavement condition of the road network. This is done by balancing the desire for reconstruction or rehabilitation of roads in poorer conditions with the need to prioritize the preservation of roads in relatively good condition. Municipal agencies achieve this by utilizing lower-cost pavement preservation applications. As shown in Figure 1, early intervention and investment in pavement preservation activities could have a Return on Investment (ROI) of up to 1,000% by delaying or eliminating more expensive reconstruction.
Item 21.
Pavement Management Report | 3
2.2 Pavement Data Collection Approach
Michael Baker performed the citywide pavement condition and roadway information data collection using the Network Survey Vehicle (NSV). The NSV used to capture data on the City’s roads was equipped with the following:
LCMS-2 pavement surface scanners to collect full-lane pavement scans with enough detail to identify rutting, surface distresses, and cracking as small as 1 mm wide.
Line-laser inertial profilers that meet ASTM E950 Class 1 specifications and that measure and calculate accurate International Roughness Index (IRI).
Four 9-megapixel high-definition right-of-way (ROW) cameras.
One 75-megapixel spherical camera that provides an industry-leading continuous 360-degree view of the roadway network.
Distance Measuring Instruments (DMI).
Differentially corrected GPS that spatially references (latitude, longitude, elevation) all collected data.
Inertial navigation with an Inertial Measurement Unit (IMU).
Figure 1: Benefits of Pavement Preservation
Item 21.
Pavement Management Report | 4
Michael Baker used the data
collected by the NSV to calculate a
PCI for each roadway segment in
accordance with the ASTM D6433
standard. To calculate the PCI,
Michael Baker used the continuous,
detailed, and precise 3D pavement
scans collected by the NSV to
process and generate a database
of pavement defects that include
location, type, severity, and quantity
of each pavement defect on
100% of the lane where data was
collected. Michael Baker Pavement
Analysts utilized the Distress
Selector application to review 3D
pavement frames for quality control
and assurance and to verify that all
distresses were correctly identified
and quantified.
Figure 3: Distress Selector Application Used for Pavement Data Quality Control The detailed pavement distress and defect information was uploaded into the PAVER software to calculate PCIs for each road segment per the ASTM D6433 standards.
Figure 2: Network Survey Vehicle (NSV)
Item 21.
Pavement Management Report | 5
3.0 FINDINGS
3.1 Current Inventory
The City’s roadway network has approximately 140 miles of roads divided into five functional classifications. At 43%, Residential roads make up the majority of the City’s roadway network. The total infrastructure asset replacement value of the City’s roadway network is approximately $580.6 million, making the roadway infrastructure one of the most valuable physical infrastructure the City manages.
Table 1 and Table 2 provide additional details about the City’s roadway network inventory. A full inventory of the City’s roadway network, including results of the pavement condition evaluation, is included in Appendix A.
Functional Classification Miles Percent of Network
Arterial 35.6 25.5%
Collector 31.2 22.4%
Residential 60.3 43.2%
Rural 11.5 8.2%
Alley 0.9 0.6%
Total 139.5 Miles
Functional Classification Area (sq ft) Replacement Cost Arterial 8,126,906 $162,538,120
Collector 7,556,157 $151,123,140
Residential 11,718,267 $234,365,340
Rural 1,528,383 $30,567,660
Alley 104,420 $2,088,400
Total 29,034,133 $580,682,660
Table 1: Roadway Network Miles
Table 2: Roadway Network Asset Value
Item 21.
Pavement Management Report | 6
3.2 Current Condition
Based on the pavement condition evaluation conducted in November 2023, the average (areaweighted) PCI of the City’s roadway network is 63.4. Approximately 68% of the roadway pavement (by area) is in Good, Satisfactory, or Fair condition, while approximately 28% of the roadway pavement is in Poor, Very Poor, or Serious condition. Approximately 1.5% of the roadway pavement area was found to be in a Failed condition, while another 1.5% had no reported PCI because they were not surfaced with asphalt or concrete pavement.
Table 3 provides the different condition categories, their respective PCI ranges, and the quantity of pavement area found in each condition category. Figure 4 shows the City’s pavement network in each condition category.
Figure 4: The City’s Pavement Condition by Area
Table 3: Condition Categories of the City’s Roads
Item 21.
Pavement Management Report | 7
4.0 PAVEMENT MANAGEMENT
SYSTEM IMPLEMENTATION
In addition to capturing updated pavement condition data for the City’s roadway network, this project had a critical objective to implement a modern and functional pavement management system. The City selected the AtlasView Pavement Management (AtlasView) application because of its ease of use, ease of access, GIS integration, and complex pavement management analysis capabilities.
AtlasView is a web-based pavement management application implemented as a centralized source of pavement condition reporting and pavement management planning.
4.1 GIS Mapping
Michael Baker used existing publicly available GIS map sources, including a GIS map file provided by the City, to create an updated GIS map of the City’s roadway network. The updated map was used during the field data collection. The map was further revised based on the collected roadway inspection data, and it was uploaded to the City’s AtlasView account as part of the pavement management system implementation task. AtlasView provides access to the City to update the GIS map directly within the pavement management system, and it can also download the GIS map as a shape file at any time.
Figure 5 shows the color-coded pavement condition of the City’s roadway network map.
Figure 5: AtlasView Pavement Network Map Module
Item 21.
Pavement Management Report | 8
4.2 Maintenance and Rehabilitation Records
Michael Baker collected historical maintenance, rehabilitation, and reconstruction records from available sources within the City and updated the pavement database in AtlasView. These historical maintenance records date back to 2017 and have been associated with each affected pavement segment in AtlasView. Additionally, AtlasView offers an easy way for the City to track all future maintenance records associated with each affected pavement segment. By maintaining updated maintenance records for each pavement segment in AtlasView, the City ensures that current pavement condition information is always available. This is because AtlasView recalculates the PCI of pavement segments, incorporating the positive impacts of maintenance activities.
Figure 6 above shows the maintenance record module in AtlasView.
4.3 Deterioration Curves
AtlasView uses deterioration curves to estimate future pavement conditions. Accurate deterioration modeling is critical to generating reliable budget and condition forecasts used for pavement management programming.
Three deterioration curves were established for the City’s roadway network. Figure 7, Figure 8, and Figure 9 show the deterioration models created and adopted for asphalt-surfaced pavements, surface-treated pavements, and concrete-surfaced pavements, respectively. The deterioration curves were developed based on a review of local and regional pavement performance information and pavement performance observations from the City staff. The City can review and update these deterioration models directly in AtlasView as more relevant performance data is acquired; however, it is not recommended to change models frequently.
Figure 6: AtlasView Pavement Maintenance Record Module
Item 21.
Pavement Management Report | 9
Figure 7: Asphalt Pavement Deterioration Curve in AtlasView Figure 8: Surface Treatment Deterioration Curve in AtlasView Figure 9: Concrete Pavement Deterioration Curve in AtlasView
Item 21.
Pavement Management Report | 10
4.4 Maintenance Activities
After a detailed discussion with City staff to review the different types of pavement maintenance and rehabilitation activities and their performance, Michael Baker developed a list of recommended activities along with their expected impact on PCI and unit cost. Table 4 shows the Maintenance and Rehabilitation Options that have been entered into the City’s AtlasView account.
Activity Name Condition Impact Unit Cost
Reconstruction – 6” Asphalt + 8” Base Reset PCI $20/sq ft
1.5” Thin Overlay Reset PCI $5/sq ft
3” Mill & Overlay Reset PCI $9/sq ft
Chip Seal Increase PCI by 30 $0.8/sq ft
High-Density Mineral Bond Increase PCI by 30 $0.5/sq ft Microsurfacing Increase PCI by 30 $1/sq ft
Slurry Seal Increase PCI by 30 $0.5/sq ft
Pavement Preservation
The further adoption of pavement preservation activities is highly recommended to the City because pavement preservation is relatively less expensive and helps extend the functional life of the pavement surface by preserving it in good condition. It is important to note that pavement preservation does not add additional structural capacity to roads, rather, it performs best when used on roads that are in Satisfactory Condition or better. While the City has used slurry seals extensively, information from the City suggests that Class-3 slurry seals have not always performed well on the City’s roads. However, the City has reported positive experiences with the use of rubberized slurry seals, which perform better in the high temperatures that are common in the City during the summer months.
The pavement preservation activities incorporated in the City’s Maintenance and Rehabilitation Options include slurry seals, microsurfacing, and chip seals. High-density mineral bonds and alternatives to slurry seals have also been added as an option for potential use on residential roads. Although the City does not have prior experience with high-density mineral bonds, these preservation applications are increasingly being adopted by municipalities with similar climates in Arizona, Utah, and Texas. The City may elect to perform small-scale demonstration projects to further assess the performance of high-density mineral bonds compared to slurry seals.
Furthermore, it is also recommended that the City use microsurfacing on higher-traffic roads, such as Arterials and Collectors, while using chip seals on rural roads.
When used appropriately, these pavement preservation activities can extend the functional life of the roadway pavement surface by up to 10 years.
Table 4: Maintenance and Rehabilitation Options
Item 21.
Pavement Management Report | 11
Rehabilitation
Once roadway pavement conditions fall out of the preservation range (below a PCI of 70), it is recommended to initiate rehabilitation activities to restore the roadway pavement surface. Two rehabilitation options have been included in the City’s Maintenance and Rehabilitation Options: thin overlays and thick overlays. Thin overlays are recommended to be no more than 1.5 inches thick while thick overlays can be up to 3 inches thick with some milling of the existing surface. In some instances, patching repairs may be needed before rehabilitation to address any localized issue that may compromise the performance of the rehabilitation. Additionally, it is recommended that crack sealing be performed prior to rehabilitation, especially for think overlay applications, to reduce the probability of existing cracks reflecting and forming on the surface of the rehabilitated pavement.
The City is encouraged to consider the use of geosynthetic and asphalt interlayers to enhance asphalt overlays by arresting existing cracks below the overlay surface, especially for projects where there is extensive cracking on the existing pavement surface. Additionally, the City is encouraged to consider the use of in-place recycling (cold in-place and hot in-place recycling) as a way to preserve the existing pavement by reusing it for rehabilitation. In-place recycling involves the milling of the top 2 to 5 inches of pavement and mixing it with a binder to re-pave it immediately. In-place recycling is performed by using a “train” of milling, paving, and compacting equipment, significantly reducing construction time since roads can usually be opened immediately after construction, and reducing virgin material needed for the construction project.
Reconstruction
Once roadway pavement conditions drop below a PCI of 30, the City should consider reconstruction.
Besides restoring the roadway pavement, reconstruction also offers an opportunity for the City to reconfigure lanes, realign geometries, and implement “Complete Streets” designs. The reconstruction option in the City’s Maintenance and Rehabilitation Options includes 6 inches of asphalt concrete over 8 inches base course.
Ongoing Maintenance
Ongoing roadway maintenance such as crack sealing and pothole filling is expected to occur as needed. Because they should be part of the regular roadway maintenance operations, these activities are not added to the Maintenance and Rehabilitation Options list. The City is encouraged to continue regular crack sealing operations on roads that are in Fair condition or better. Crack sealing reduces the amount of moisture and debris that enter the pavement structure through surface cracks and increases the performance and functional life of the pavement. Potholes should also be filled as soon as observed so that they do not pose any safety risks for the traveling public and delay further deterioration of the pavement surface around the pothole.
4.5 Maintenance Policy
A maintenance policy was developed and uploaded into the City’s AtlasView account that includes a decision tree detailing the condition range that warrants the application of preservation, rehabilitation, and reconstruction activities discussed in the previous section.
Table 5 describes the recommended PCI range for the application of each maintenance and rehabilitation activity for the City’s roadway network. The City can update or revise the maintenance policy directly in AtlasView. It is recommended that the City reviews the maintenance policy at least every two years to make sure it aligns with field observations and maintenance objectives.
Item 21.
Pavement Management Report | 12
Activity Type Functional
Classification PCI Range
Reconstruction – 6” Asphalt + 8” Base All Less than or equal to 30
1.5” Thin Overlay All Between 55 and 65
3” Mill & Overlay All Between 35 and 45
Chip Seal Rural Between 70 and 85
Microsurfacing Arterial & Collector Between 70 and 85
Slurry Seal Residential Between 70 and 85
Slurry Seal Increase PCI by 30 $0.5/sq ft
4.6 AtlasView Public Dashboard
One of the project’s objectives was to increase transparency and facilitate easy access to roadway condition information for all City residents. To achieve this, Michael Baker implemented AtlasView’s Public Dashboard (Dashboard) for the City alongside the new pavement management system.
The Dashboard is web-based and can be accessed through a URL (Infrastructure Management (atlasview.co)) which can be provided for public access on the City’s website. The Dashboard can also be embedded into the City’s website for added functionality.
The Dashboard is connected to the City’s pavement management system in real-time and provides up-to-date pavement condition information of the City’s roadway network. The Dashboard includes a color-coded map that shows the condition of the City’s roadway network. Users can zoom in and select a specific street to learn about the condition of that street segment. Figure 10 provides an image of the City’s Dashboard.
Figure 10: The City of Coachella’s AtlasView Public Dashboard Table 5: Maintenance Policy Decision Matrix
Item 21.
Pavement Management Report | 13
5.0 PAVEMENT MANAGEMENT
ANALYSIS
After uploading pavement condition data, deterioration models, maintenance activities, and the maintenance policy, Michael Baker performed a pavement management analysis that included six scenarios. These scenarios were analyzed for a period of ten years and show the expected roadway network condition as a result of six distinct annual investment plans over the analysis period. The findings and observations of these analyses are described in the following sections.
5.1 Scenario 1: Unlimited Budget
The Unlimited Budget scenario analyzes a hypothetical scenario in which the City has a “blank check” to perform all necessary pavement maintenance, rehabilitation, and reconstruction based on the established maintenance policy. While it is unlikely that any municipal agency would have access to funding that enables this scenario, the results provide an opportunity to review how much funding would be needed to “do everything.”
The results of the analysis show that the City needs to invest approximately $18 million annually, on average, over the next 10 years to perform all recommended maintenance rehabilitation tasks. The average roadway PCI after 10 years is expected to be 99.9. Figure 11 shows annual fluctuations of the budget and condition over the analysis period.
Figure 11: Annual Budget, Backlog, and Condition for the “Unlimited Budget” Scenario
Item 21.
Pavement Management Report | 14
As seen in Figure 11, this scenario includes a high investment of approximately $130.6 million in the first year to perform all activities that are currently in backlog; the following three years require a relatively reduced annual investment ranging approximately from $30.5 million to $31 million. The final six years have low annual investment requirements ranging from $24,000 to $1.3 million. Figure 12 shows how the network condition is expected to change for the analysis period.
Figure 12: Changes in Network Pavement Condition for the “Unlimited Budget” Scenario Appendix B includes the detailed annual work plan generated as part of this scenario analysis.
Item 21.
Pavement Management Report | 15
5.2 Scenario 2: Backlog Elimination
The Backlog Elimination scenario analyzes a hypothetical scenario in which the City has the needed funds to perform all necessary pavement maintenance, rehabilitation, and reconstruction based on the established maintenance policy with the goal of eliminating all backlog in 10 years. Similarly to the Unlimited Budget scenario, few municipal agencies would realistically have access to the level of funding that enables this scenario; however, this analysis provides an opportunity to review how much funding would be needed to gradually reduce the backlog of pavement maintenance work in the City.
The results of the analysis show that the City needs to invest approximately $20.2 million annually, on average, over the next 10 years to perform all recommended maintenance rehabilitation tasks. The average roadway PCI after 10 years is expected to be 98.6. Figure 13 shows annual fluctuations of the budget, backlog, and condition over the analysis period.
Figure 13: Annual Budget, Backlog, and Condition for the “Backlog Elimination” Scenario
Item 21.
Pavement Management Report | 16
As seen in Figure 13, this scenario includes a relatively stable annual budget ranging from approximately $20.7 million to $18.7 million, while the backlog gradually and consistently decreases over the analysis period. While the end network condition for the Backlog Elimination scenario is similar to the Unlimited Budget scenario (a difference of only 1.3 PCI points), the average annual budget and total investment for the two scenarios are different. The Backlog Elimination scenario requires an additional $2.2 million of investment per year resulting in over $22.1 million more in investments over the analysis period. This difference reflects the increasing cost of deferred work.
Deferring work increases backlog and addressing it in the future often requires even more funds due to the expected continual condition deterioration of roadway pavements. Therefore, it is critical to consider managing and reducing the backlog of work in addition to aiming to improve the roadway network condition.
Figure 14 shows how the network condition is expected to change for the analysis period.
Figure 14: Changes in Network Pavement Condition for the “Backlog Elimination” Scenario Appendix C includes the detailed annual work plan generated as part of this scenario analysis.
Item 21.
Pavement Management Report | 17
5.3 Scenario 3: Do Nothing
The Do Nothing scenario analyzes a hypothetical scenario in which the City has no funds to perform any of the necessary pavement maintenance, rehabilitation, and reconstruction based on the established maintenance policy over the next 10 years. Similarly to the previous two scenarios, few municipal agencies would find themselves in a situation where there is no roadway maintenance funding available for a decade; however, this analysis provides an opportunity to review the impact of a sustained lack of maintenance of the roadway pavement infrastructure.
The results of the analysis show that the City‘s average roadway PCI is expected to fall to 40.3 after 10 years. Figure 15 shows annual fluctuations of the backlog and condition over the analysis period.
Figure 15: Annual Budget, Backlog, and Condition for the “Do Nothing” Scenario As seen in Figure 15, the backlog gradually and consistently grows over the analysis period and reaches over $244.1 million at the end of the analysis period.
Figure 16 shows how the network condition is expected to change for the analysis period.
Item 21.
Pavement Management Report | 18
Figure 16: Changes in Network Pavement Condition for the “Backlog Elimination” Scenario
Item 21.
Pavement Management Report | 19
5.4 Scenario 4: Maintain Current Condition
The Maintain Current Condition scenario forecasts the necessary investment for the City to maintain the current average condition of its roadway network over the analysis period. The results of the analysis show that the City needs to invest approximately $4.6 million annually, on average, over the next 10 years to perform all recommended maintenance rehabilitation tasks. After 10 years, the average roadway pavement condition is expected to remain the same (PCI of 63.4). However, the PCI will fluctuate between 63.2 and 66 over the analysis period.
Figure 17 shows annual budget fluctuations, backlog, and condition over the analysis period.
Figure 18 shows how the network condition is expected to change for the analysis period.
Appendix D includes the detailed annual work plan generated as part of this scenario analysis.
Figure 17: Annual Budget, Backlog, and Condition for the “Maintain Current Condition” Scenario
Item 21.
Pavement Management Report | 20
Figure 18: Changes in Network Pavement Condition for the “Maintain Current Condition” Scenario
Item 21.
Pavement Management Report | 21
5.5 Scenario 5: Reach PCI of 70
The Reach PCI of 70 scenario forecasts how much investment the City needs to make so that the roadway network average condition reaches a PCI of 70 over the analysis period. The results of the analysis show that the City needs to invest approximately $6.9 million annually, on average, over the next 10 years to perform all recommended maintenance rehabilitation tasks. The average roadway pavement condition after 10 years is expected to reach a PCI of 70; however, the PCI will have values ranging between 66.9 and 70 over the analysis period.
Figure 19 shows annual budget fluctuations, backlog, and condition over the analysis period.
Figure 20 shows how the network condition is expected to change for the analysis period.
Appendix E includes the detailed annual work plan generated as part of this scenario analysis.
Figure 19: Annual Budget, Backlog, and Condition for the “Reach PCI of 70” Scenario
Item 21.
Pavement Management Report | 22
Figure 20: Changes in Network Pavement Condition for the “Reach PCI of 70” Scenario
Item 21.
Pavement Management Report | 23
5.6 Scenario 6: Current Budget
The Current Budget scenario forecasts how the network’s average pavement condition changes over the analysis period if the City continues to invest at the current annual budget level of $1 million.
The results of the analysis show that the City’s average roadway network condition will reduce by approximately 14 points and reach a PCI of 49.6 at the end of the analysis period. Based on the results of this analysis, the City’s current budget is insufficient to maintain the status quo and will ultimately lead to severe pavement condition degradation.
Figure 21 shows annual budget fluctuations, backlog, and condition over the analysis period.
Figure 22 shows how the network condition is expected to change for the analysis period.
Appendix F includes the detailed annual work plan generated as part of this scenario analysis.
Figure 21: Annual Budget, Backlog, and Condition for the “Current Budget” Scenario
Item 21.
Pavement Management Report | 24
Figure 22: Changes in Network Pavement Condition for the “Current Budget” Scenario
Item 21.
Pavement Management Report | 25
6.0 RECOMMENDATIONS
By gathering objective and accurate pavement condition data and implementing a modern and functional pavement management system, the City has taken a critical step towards understanding how its roadway pavement network condition changes over time and determining the investment levels needed to achieve network condition targets. It is also commendable that the City has increased transparency of the roadway network condition by implementing the AtlasView Public Dashboard. Below are some recommendations from Michael Baker for the City’s consideration:
Prior to the pavement condition evaluation in November 2023, the last cycle of pavement inspection was conducted seven years ago. It is recommended that the City conduct objective and accurate pavement condition evaluations every three to five years.
The City should review the list of maintenance options and the maintenance policy annually to make sure that they are applicable. The review and update can be done directly in the City’s AtlasView account.
The City should regularly update AtlasView with relevant information such as maintenance records and GIS map updates. A pavement management system, such as the City’s AtlasView system implemented as part of this project, remains reliable and accurate only when the underlying data is up to date.
The City should find a balance between pavement preservation activities and major rehabilitation or reconstruction activities. It is much more cost-effective to maintain good pavements in good condition through pavement preservation rather than waiting for pavements to reach poor conditions before intervening.
6.1 Budget and Financing
The City’s current annual maintenance budget of $1 million is not sufficient to continue maintaining the current condition. It is recommended that the City, at minimum, adopt the findings and recommendations of Scenario 4 (Maintain Current Condition) discussed in Section 5.4, which 1 2
3 4
Item 21.
Pavement Management Report | 26
suggests that the City increases pavement maintenance and rehabilitation funding to $4.6 million annually so that the current average PCI of 63.4 is maintained over the next 10 years. Increasing the annual pavement maintenance and rehabilitation budget by almost 400% will require the City to look for new revenue sources. Below are further recommendations for the City to consider implementing to secure sufficient and sustainable revenue sources for funding the City’s pavement maintenance and rehabilitation budget.
Home Owners’ Associations (HOA): as the City continues to grow, more residential housing developments are expected to come to the City to expand the real estate inventory. The City should consider requiring new housing developments to establish HOAs responsible for managing and maintaining all residential roads within the boundaries of each HOA. This approach will enable the City to continue expanding its roadway network without having the maintenance and rehabilitation responsibility that comes with a growing roadway network.
Community Facility Districts (CFD): CFDs are independent entities that can levy taxes for the purpose of infrastructure development and maintenance. CFDs can be established by municipal governments; however, all debts and financial obligations of CFDs are typically not liabilities of the municipal government that established the CFDs. The City should consider establishing a CFD for all new developments to fund their roadway repair and maintenance needs. This CFD can also serve as a taxing entity that raises funds for other infrastructure development and maintenance fund such as water/wastewater facilities, park improvement, school facilities, and landscaping improvements. Additionally, the City should also consider establishing a CFD to raise funds for citywide pavement maintenance and rehabilitation needs.
Tax: an alternative method to raise additional funds for roadway maintenance is to levy tax. A common approach is to levy additional sales tax or gasoline tax that would be indexed to the Consumer Pricing Index and be dedicated to citywide pavement rehabilitation and preservation.
For example, Washoe County (Nevada) has implemented a voter approved gasoline tax that directly funds the countywide pavement preservation projects; this dedicated and sustainable funding has enabled Washoe County to have one of the best implemented pavement preservation programs in the country. The City should consider implementing an additional tax measure through sales and gasoline tax to establish a dedicated, consistent, and sustainable funding source for roadway maintenance and rehabilitation.
Grants: regional entities (such as CVAG and RCTC), state government, and federal agencies have grants that municipal governments and local agencies can have access to for roadway improvement projects. These grants are usually targeted towards projects that improve existing roadways through implementations of “complete streets”, updated transit corridors, multiuse paths, and other roadway features that expand the use of the roadway. While meeting the primary grant requirements, these funds could also help pay for roadway pavement improvements. There usually are limited amount of grants available; however, the City should consider seeking out and applying for applicable grants to help fund some of the major roadway rehabilitation projects while also addressing other associated road use challenges.
Riverside County Transportation Commission (RCTC) Tax Relief Plan: The RCTC has proposed a Traffic Relief Plan that seeks to raise funds through a sales tax measure to help with regional transportation projects. This tax measure is expected to be on the ballot later in 2024 and, if approved, could be managed and administered through CVAG. The City should continue to work closely with CVAG to ensure that the City’s pavement maintenance and preservation needs are known, and actively work towards securing a consistent funding stream from this tax measure for the City’s pavement maintenance budget. 1 2
3 4
5
Item 21.
APPENDIX A:
ROAD INVENTORY WITH 2023
INSPECTION
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::1STST::1 1ST ST SH-86 PALM AVE 183 57 10431 Collector Asphalt 60 11/6/2023 COACH::1STST::2 1ST ST PALM AVE ORCHARD AVE 426 57 24282 Collector Asphalt 65 11/6/2023 COACH::1STST::3 1ST ST ORCHARD AVE VINE AVE 425 57 24225 Collector Asphalt 82 11/6/2023 COACH::1STST::4 1ST ST VINE AVE SH-111 454 57 25878 Collector Asphalt 79 11/6/2023 COACH::2NDST::1 2ND ST D/E PALM AVE 387 56 21672 Collector Asphalt 54 11/6/2023 COACH::2NDST::2 2ND ST PALM AVE ORCHARD AVE 426 56 23856 Collector Asphalt 49 11/6/2023 COACH::2NDST::3 2ND ST ORCHARD AVE VINE AVE 425 56 23800 Collector Asphalt 45 11/6/2023 COACH::2NDST::4 2ND ST VINE AVE ALLEY 245 56 13720 Collector Asphalt 50 11/6/2023 COACH::2NDST::5 2ND ST ALLEY SH-111 206 56 11536 Collector Asphalt 58 11/6/2023 COACH::3RDST::1 3RD ST D/E PALM AVE 387 56 21672 Collector Asphalt 49 11/6/2023 COACH::3RDST::2 3RD ST PALM AVE ORCHARD AVE 425 56 23800 Collector Asphalt 38 11/6/2023 COACH::3RDST::3 3RD ST ORCHARD AVE VINE AVE 425 56 23800 Collector Asphalt 36 11/6/2023 COACH::3RDST::4 3RD ST VINE AVE ALLEY 245 56 13720 Collector Asphalt 54 11/6/2023 COACH::3RDST::5 3RD ST ALLEY SH-111 207 56 11592 Collector Asphalt 49 11/6/2023 COACH::44THAVEE::1 44TH AVE HARRISON ST DILLON RD 5550 13 72150 Arterial Asphalt 96 11/6/2023 COACH::44THAVEW::1 44TH AVE HARRISON ST DILLON RD 5557 13 72241 Arterial Asphalt 98 11/6/2023 COACH::48THAVEE::1 48TH AVE JACKSON ST CIELO VICTORIA ST 1335 40 53400 Arterial Asphalt 62 11/6/2023 COACH::48THAVEE::2 48TH AVE CIELO VICTORIA ST CALHOUN ST 1327 40 53080 Arterial Asphalt 69 11/6/2023 COACH::48THAVEE::3 48TH AVE CALHOUN ST CHAPARROSA ST 710 40 28400 Arterial Asphalt 78 11/6/2023 COACH::48THAVEE::4 48TH AVE CHAPARROSA ST VAN BUREN ST 1940 40 77600 Arterial Asphalt 81 11/6/2023 COACH::48THAVEE::5 48TH AVE VAN BUREN ST SH-111 2210 20 44200 Arterial Asphalt 31 11/6/2023 COACH::48THAVEE::6 48TH AVE CITY LIMITS HARRISON ST 2395 24 57480 Arterial Asphalt 92 11/6/2023 COACH::48THAVEW::1 48TH AVE HARRISON ST CITY LIMITS 2385 24 57240 Arterial Asphalt 97 11/6/2023 COACH::48THAVEW::2 48TH AVE SH-111 VAN BUREN ST 2209 20 44180 Arterial Asphalt 30 11/6/2023 COACH::48THAVEW::3 48TH AVE VAN BUREN ST CHAPARROSA ST 1940 40 77600 Arterial Asphalt 74 11/6/2023 COACH::48THAVEW::4 48TH AVE CHAPARROSA ST CALHOUN ST 710 40 28400 Arterial Asphalt 76 11/6/2023 COACH::48THAVEW::5 48TH AVE CALHOUN ST CIELO VICTORIA ST 1327 40 53080 Arterial Asphalt 71 11/6/2023 COACH::48THAVEW::6 48TH AVE CIELO VICTORIA ST JACKSON ST 1335 40 53400 Arterial Asphalt 79 11/6/2023 COACH::49THAVE::1 49TH AVE VAN BUREN ST PRIMA VERA 849 38 32262 Collector Asphalt 60 11/6/2023 COACH::49THAVE::2 49TH AVE PRIMA VERA JAZMIN ST 611 38 23218 Collector Asphalt 47 11/6/2023 COACH::49THAVE::3 49TH AVE JAZMIN ST FREDERICK ST 1199 66 79134 Collector Asphalt 45 11/6/2023 COACH::49THAVE::4 49TH AVE FREDERICK ST LAS CRUCES ST 1158 66 76428 Collector Asphalt 28 11/6/2023 COACH::49THAVE::5 49TH AVE LAS CRUCES ST SH-111 406 66 26796 Collector Asphalt 22 11/6/2023 COACH::4THST::1 4TH ST SH-86 PALM AVE 972 56 54432 Collector Asphalt 34 11/6/2023 COACH::4THST::2 4TH ST PALM AVE ORCHARD AVE 425 56 23800 Collector Asphalt 49 11/6/2023 COACH::4THST::3 4TH ST ORCHARD AVE VINE AVE 425 56 23800 Collector Asphalt 26 11/6/2023 COACH::4THST::4 4TH ST VINE AVE SH-111 452 56 25312 Collector Asphalt 37 11/6/2023 COACH::50THAVE::1 50TH AVE SH-86 PETER RABBIT LN 1679 40 67160 Arterial Asphalt 80 11/6/2023 COACH::50THAVE::2 50TH AVE PETER RABBIT LN 1660' W/O TYLER ST 1062 40 42480 Arterial Asphalt 43 11/6/2023 COACH::50THAVE::3 50TH AVE 660' W/O TYLER ST 1660' W/O TYLER ST 1000 40 40000 Arterial Asphalt 21 11/6/2023 COACH::50THAVE::4 50TH AVE TYLER ST 660' W/O TYLER ST 658 40 26320 Arterial Asphalt 7 11/6/2023 COACH::50THAVE::5 50TH AVE 940' E/O TYLER ST TYLER ST 934 30 28020 Rural Asphalt 12 11/6/2023 COACH::50THAVE::6 50TH AVE TYLER ST 50TH AVE 1063 30 31890 Rural Asphalt 79 11/6/2023 COACH::50THAVE::7 50TH AVE 50TH AVE POLK ST 4426 30 132780 Rural Asphalt 49 11/6/2023 COACH::50THAVE::8 50TH AVE POLK ST FILLMORE ST 5310 26 138060 Rural Asphalt 18 11/6/2023 COACH::50THAVEE::1 50TH AVE CITY LIMITS COLONIA DR 1123 30 33690 Arterial Asphalt 18 11/6/2023 COACH::50THAVEE::10 50TH AVE FREDERICK ST PAVON PALMA 375 33 12375 Arterial Asphalt 18 11/6/2023 COACH::50THAVEE::11 50TH AVE PAVON PALMA AVENIDA DEL PARQUE 416 33 13728 Arterial Asphalt 55 11/6/2023 COACH::50THAVEE::12 50TH AVE AVENIDA DEL PARQUE AVENIDA DE ORO 541 33 17853 Arterial Asphalt 59 11/6/2023 COACH::50THAVEE::13 50TH AVE AVENIDA DE ORO BALBOA ST 132 33 4356 Arterial Asphalt 46 11/6/2023 COACH::50THAVEE::14 50TH AVE BALBOA ST AVENIDA DE PLATA 132 33 4356 Arterial Asphalt 51 11/6/2023 COACH::50THAVEE::15 50TH AVE AVENIDA DE PLATA CORONADO ST 132 33 4356 Arterial Asphalt 56 11/6/2023 COACH::50THAVEE::16 50TH AVE CORONADO ST AVENIDA DE PLATINA 133 33 4389 Arterial Asphalt 58 11/6/2023 COACH::50THAVEE::17 50TH AVE AVENIDA DE PLATINA KENMORE ST 131 33 4323 Arterial Asphalt 56 11/6/2023 COACH::50THAVEE::18 50TH AVE KENMORE ST SH-86 673 33 22209 Arterial Asphalt 85 11/6/2023 COACH::50THAVEE::2 50TH AVE COLONIA DR CALHOUN ST 521 30 15630 Arterial Asphalt 24 11/6/2023 COACH::50THAVEE::3 50TH AVE CALHOUN ST HORNBLEND ST 731 32 23392 Arterial Asphalt 99 11/6/2023 COACH::50THAVEE::4 50TH AVE HORNBLEND ST CALLE PUERTA DEL SOL 1240 32 39680 Arterial Asphalt 58 11/6/2023 COACH::50THAVEE::5 50TH AVE CALLE PUERTA DEL SOL VAN BUREN ST 679 32 21728 Arterial Asphalt 46 11/6/2023 COACH::50THAVEE::6 50TH AVE VAN BUREN ST WASHINGTONIA AVE 1203 41 49323 Arterial Asphalt 39 11/6/2023 COACH::50THAVEE::7 50TH AVE WASHINGTONIA AVE CALLE QUINTERRA 705 41 28905 Arterial Asphalt 30 11/6/2023 COACH::50THAVEE::8 50TH AVE CALLE QUINTERRA MAZATLAN DR 506 41 20746 Arterial Asphalt 55 11/6/2023 COACH::50THAVEE::9 50TH AVE MAZATLAN DR FREDERICK ST 253 41 10373 Arterial Asphalt 53 11/6/2023 COACH::50THAVEW::1 50TH AVE SH-86 KENMORE ST 673 33 22209 Arterial Asphalt 64 11/6/2023 COACH::50THAVEW::10 50TH AVE FREDERICK ST MAZATLAN DR 253 41 10373 Arterial Asphalt 65 11/6/2023 COACH::50THAVEW::11 50TH AVE MAZATLAN DR CALLE QUINTERRA 506 41 20746 Arterial Asphalt 72 11/6/2023 COACH::50THAVEW::12 50TH AVE CALLE QUINTERRA WASHINGTONIA AVE 705 41 28905 Arterial Asphalt 52 11/6/2023 COACH::50THAVEW::13 50TH AVE VAN BUREN ST CALLE PUERTA DEL SOL 679 32 21728 Arterial Asphalt 65 11/6/2023 COACH::50THAVEW::14 50TH AVE WASHINGTONIA AVE VAN BUREN ST 1203 41 49323 Arterial Asphalt 22 11/6/2023 COACH::50THAVEW::15 50TH AVE CALLE PUERTA DEL SOL HORNBLEND ST 1240 32 39680 Arterial Asphalt 71 11/6/2023 COACH::50THAVEW::16 50TH AVE HORNBLEND ST CALHOUN ST 731 32 23392 Arterial Asphalt 86 11/6/2023 COACH::50THAVEW::17 50TH AVE CALHOUN ST COLONIA DR 521 30 15630 Arterial Asphalt 59 11/6/2023 COACH::50THAVEW::18 50TH AVE COLONIA DR CITY LIMITS 1123 30 33690 Arterial Asphalt 58 11/6/2023 COACH::50THAVEW::2 50TH AVE KENMORE ST AVENIDA DE PLATINA 131 33 4323 Arterial Asphalt 49 11/6/2023 COACH::50THAVEW::3 50TH AVE AVENIDA DE PLATINA CORONADO ST 133 33 4389 Arterial Asphalt 37 11/6/2023 COACH::50THAVEW::4 50TH AVE CORONADO ST AVENIDA DE PLATA 132 33 4356 Arterial Asphalt 36 11/6/2023 COACH::50THAVEW::5 50TH AVE AVENIDA DE PLATA BALBOA ST 132 33 4356 Arterial Asphalt 33 11/6/2023 COACH::50THAVEW::6 50TH AVE BALBOA ST AVENIDA DE ORO 132 33 4356 Arterial Asphalt 73 11/6/2023 COACH::50THAVEW::7 50TH AVE AVENIDA DE ORO AVENIDA DEL PARQUE 541 33 17853 Arterial Asphalt 54 11/6/2023 COACH::50THAVEW::8 50TH AVE AVENIDA DEL PARQUE PAVON PALMA 416 33 13728 Arterial Asphalt 39 11/6/2023 COACH::50THAVEW::9 50TH AVE PAVON PALMA FREDERICK ST 375 33 12375 Arterial Asphalt 46 11/6/2023 COACH::51STAVE::1 51ST AVE CITY LIMITS VAN BUREN ST 1312 30 39360 Collector Asphalt 91 11/6/2023 COACH::51STAVE::2 51ST AVE VAN BUREN ST ZUMA DR 1166 42 48972 Collector Asphalt 52 11/6/2023 COACH::51STAVE::3 51ST AVE ZUMA DR CHIAPAS DR 799 42 33558 Collector Asphalt 20 11/6/2023 COACH::51STAVE::4 51ST AVE CHIAPAS DR FREDERICK ST 694 72 49968 Collector Asphalt 85 11/6/2023 COACH::51STAVE::5 51ST AVE FREDERICK ST 690' E/O FREDRICK ST 689 62 42718 Collector Asphalt 75 11/6/2023 COACH::51STAVE::6 51ST AVE 400' W/O AVENIDA ADOBE AVENIDA ADOBE 402 62 24924 Collector Asphalt 73 11/6/2023 COACH::51STAVE::7 51ST AVE AVENIDA ADOBE MECCA LANE 238 62 14756 Collector Asphalt 73 11/6/2023 COACH::51STAVE::8 51ST AVE MECCA LANE SUNCREST ST 969 60 58140 Collector Asphalt 81 11/6/2023 COACH::51STAVE::9 51ST AVE SUNCREST ST SH-86 360 60 21600 Collector Asphalt 75 11/6/2023 COACH::52NDAVE::1 52ND AVE CALHOUN ST VAN BUREN ST 2637 60 158220 Arterial Asphalt 97 11/6/2023 COACH::52NDAVE::16 52ND AVE SH-86 TIJSSELING CT 348 44 15312 Arterial Asphalt 61 11/6/2023 COACH::52NDAVE::17 52ND AVE TIJSSELING CT JENNIFER WAY 39 44 1716 Arterial Asphalt 79 11/6/2023 COACH::52NDAVE::18 52ND AVE JENNIFER WAY ALLEY 115 44 5060 Arterial Asphalt 53 11/6/2023 COACH::52NDAVE::19 52ND AVE ALLEY TRIPOLI WAY 140 44 6160 Arterial Asphalt 54 11/6/2023 COACH::52NDAVE::2 52ND AVE VAN BUREN ST PRIMITIVO DR 1325 60 79500 Arterial Asphalt 58 11/6/2023 COACH::52NDAVE::20 52ND AVE TRIPOLI WAY MORGAN AVE 274 50 13700 Arterial Asphalt 71 11/6/2023 COACH::52NDAVE::21 52ND AVE MORGAN AVE NELSON ST 276 50 13800 Arterial Asphalt 77 11/6/2023 COACH::52NDAVE::22 52ND AVE NELSON ST DATE AVE 110 50 5500 Arterial Asphalt 76 11/6/2023 COACH::52NDAVE::23 52ND AVE DATE AVE LAS PALMAS ST 158 44 6952 Arterial Asphalt 82 11/6/2023 COACH::52NDAVE::24 52ND AVE LAS PALMAS ST OASIS PALM AVE 259 44 11396 Arterial Asphalt 74 11/6/2023 COACH::52NDAVE::25 52ND AVE OASIS PALM AVE DOS PALMAS AVE 260 44 11440 Arterial Asphalt 75 11/6/2023 COACH::52NDAVE::26 52ND AVE DOS PALMAS AVE CYPRESS ST 260 44 11440 Arterial Asphalt 80 11/6/2023 COACH::52NDAVE::27 52ND AVE CYPRESS ST SHADY LN 260 44 11440 Arterial Asphalt 80 11/6/2023 COACH::52NDAVE::28 52ND AVE SHADY LN SHADY LN 142 44 6248 Arterial Asphalt 96 11/6/2023 COACH::52NDAVE::37 52ND AVE HERNANDEZ ST POLK ST 1999 30 59970 Arterial Asphalt 47 11/6/2023 COACH::52NDAVE::38 52ND AVE POLK ST 1030' E/O POLK ST 1030 30 30900 Rural Asphalt 56 11/6/2023 COACH::52NDAVE::39 52ND AVE 1030' E/O POLK ST 2700' W/O FILLMORE ST 2109 30 63270 Rural Asphalt 61 11/6/2023 COACH::52NDAVE::40 52ND AVE 2700' W/O FILLMORE ST 2200' W/O FILLMORE ST 505 30 15150 Rural Asphalt 57 11/6/2023 COACH::52NDAVE::41 52ND AVE 2200' W/O FILLMORE ST FILLMORE ST 2180 30 65400 Rural Asphalt 89 11/6/2023 COACH::52NDAVE::42 52ND AVE FILLMORE ST 5300' E/O FILLMORE ST 5302 15 79530 Rural Asphalt 19 11/6/2023 COACH::52NDAVE::43 52ND AVE 5300' E/O FILLMORE ST CITY LIMITS 901 15 13515 Rural Asphalt 77 11/6/2023 COACH::52NDAVEE::10 52ND AVE CALLE TECHA CALLE TECHA 121 26 3146 Arterial Asphalt 59 11/6/2023 COACH::52NDAVEE::11 52ND AVE CALLE TECHA CALLE AVILA 203 26 5278 Arterial Asphalt 63 11/6/2023 COACH::52NDAVEE::12 52ND AVE CALLE AVILA CALLE AVILA 58 26 1508 Arterial Asphalt 68 11/6/2023 COACH::52NDAVEE::13 52ND AVE CALLE AVILA CALLE CAMACHO 266 26 6916 Arterial Asphalt 71 11/6/2023 COACH::52NDAVEE::14 52ND AVE CALLE CAMACHO CESAR CHAVEZ ST 313 26 8138 Arterial Asphalt 52 11/6/2023 COACH::52NDAVEE::15 52ND AVE CESAR CHAVEZ ST SH-86 86 26 2236 Arterial Asphalt 56 11/6/2023 COACH::52NDAVEE::29 52ND AVE SHADY LN GENOA ST 525 45 23625 Arterial Asphalt 89 11/6/2023 COACH::52NDAVEE::3 52ND AVE PRIMITIVO DR FREDERICK ST 1288 30 38640 Arterial Asphalt 30 11/6/2023 COACH::52NDAVEE::30 52ND AVE GENOA ST CALLE LIMON 547 45 24615 Arterial Asphalt 69 11/6/2023 COACH::52NDAVEE::31 52ND AVE CALLE LIMON SUNSET DR 335 45 15075 Arterial Asphalt 70 11/6/2023 COACH::52NDAVEE::32 52ND AVE SUNSET DR SH-111 606 45 27270 Arterial Asphalt 78 11/6/2023 COACH::52NDAVEE::33 52ND AVE SH-111 TYLER ST 1106 45 49770 Arterial Asphalt 83 11/6/2023 COACH::52NDAVEE::34 52ND AVE TYLER ST LA PONDEROSA DR 2319 45 104355 Arterial Asphalt 35 11/6/2023 COACH::52NDAVEE::35 52ND AVE LA PONDEROSA DR ENTERPRISE WAY 418 45 18810 Arterial Asphalt 12 11/6/2023 COACH::52NDAVEE::36 52ND AVE ENTERPRISE WAY HERNANDEZ ST 634 45 28530 Arterial Asphalt 6 11/6/2023 COACH::52NDAVEE::4 52ND AVE FREDERICK ST DOUMA ST 703 26 18278 Arterial Asphalt 73 11/6/2023 COACH::52NDAVEE::5 52ND AVE DOUMA ST DOUMA CT 362 26 9412 Arterial Asphalt 74 11/6/2023 COACH::52NDAVEE::6 52ND AVE DOUMA CT CALLE TORRES ORDUNO 204 26 5304 Arterial Asphalt 69 11/6/2023 COACH::52NDAVEE::7 52ND AVE CALLE TORRES ORDUNO CALLE EMPALME 56 26 1456 Arterial Asphalt 59 11/6/2023 COACH::52NDAVEE::8 52ND AVE CALLE EMPALME CALLE EMPALME 184 26 4784 Arterial Asphalt 57 11/6/2023 COACH::52NDAVEE::9 52ND AVE CALLE EMPALME CALLE TECHA 140 26 3640 Arterial Asphalt 52 11/6/2023 COACH::52NDAVEW::1 52ND AVE HERNANDEZ ST ENTERPRISE WAY 631 45 28395 Arterial Asphalt 20 11/6/2023 A1
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::52NDAVEW::10 52ND AVE CESAR CHAVEZ ST CALLE CAMACHO 313 26 8138 Arterial Asphalt 49 11/6/2023 COACH::52NDAVEW::11 52ND AVE CALLE CAMACHO CALLE AVILA 266 26 6916 Arterial Asphalt 69 11/6/2023 COACH::52NDAVEW::12 52ND AVE CALLE AVILA CALLE AVILA 58 26 1508 Arterial Asphalt 55 11/6/2023 COACH::52NDAVEW::13 52ND AVE CALLE AVILA CALLE TECHA 203 26 5278 Arterial Asphalt 61 11/6/2023 COACH::52NDAVEW::14 52ND AVE CALLE TECHA CALLE TECHA 121 26 3146 Arterial Asphalt 66 11/6/2023 COACH::52NDAVEW::15 52ND AVE CALLE TECHA CALLE EMPALME 140 26 3640 Arterial Asphalt 60 11/6/2023 COACH::52NDAVEW::16 52ND AVE CALLE EMPALME CALLE EMPALME 184 26 4784 Arterial Asphalt 57 11/6/2023 COACH::52NDAVEW::17 52ND AVE CALLE EMPALME CALLE TORRES ORDUNO 57 26 1482 Arterial Asphalt 61 11/6/2023 COACH::52NDAVEW::18 52ND AVE CALLE TORRES ORDUNO DOUMA CT 203 26 5278 Arterial Asphalt 74 11/6/2023 COACH::52NDAVEW::19 52ND AVE DOUMA CT DOUMA ST 362 26 9412 Arterial Asphalt 68 11/6/2023 COACH::52NDAVEW::2 52ND AVE ENTERPRISE WAY LA PONDEROSA DR 418 45 18810 Arterial Asphalt 15 11/6/2023 COACH::52NDAVEW::20 52ND AVE DOUMA ST FREDERICK ST 703 26 18278 Arterial Asphalt 71 11/6/2023 COACH::52NDAVEW::21 52ND AVE FREDERICK ST PRIMITIVO DR 1286 30 38580 Arterial Asphalt 22 11/6/2023 COACH::52NDAVEW::3 52ND AVE LA PONDEROSA DR TYLER ST 2319 45 104355 Arterial Asphalt 55 11/6/2023 COACH::52NDAVEW::4 52ND AVE TYLER ST SH-111 1126 45 50670 Arterial Asphalt 77 11/6/2023 COACH::52NDAVEW::5 52ND AVE SH-111 SUNSET DR 587 45 26415 Arterial Asphalt 77 11/6/2023 COACH::52NDAVEW::6 52ND AVE SUNSET DR CALLE LIMON 335 45 15075 Arterial Asphalt 73 11/6/2023 COACH::52NDAVEW::7 52ND AVE CALLE LIMON GENOA ST 547 45 24615 Arterial Asphalt 70 11/6/2023 COACH::52NDAVEW::8 52ND AVE GENOA ST SHADY LN 525 45 23625 Arterial Asphalt 82 11/6/2023 COACH::52NDAVEW::9 52ND AVE SH-86 CESAR CHAVEZ ST 86 26 2236 Arterial Asphalt 46 11/6/2023 COACH::53RDAVE::1 53RD AVE FREDERICK ST CALLE LEANDRO 950 42 39900 Collector Asphalt 98 11/6/2023 COACH::53RDAVE::11 53RD AVE SH-86 CALLE BONITA 643 60 38580 Collector Asphalt 25 11/6/2023 COACH::53RDAVE::12 53RD AVE CALLE BONITA ADAM LN 282 60 16920 Collector Asphalt 64 11/6/2023 COACH::53RDAVE::13 53RD AVE ADAM LN LEE LN 272 60 16320 Collector Asphalt 75 11/6/2023 COACH::53RDAVE::14 53RD AVE LEE LN CALLE LA PAZ 327 60 19620 Collector Asphalt 68 11/6/2023 COACH::53RDAVE::15 53RD AVE CALLE LA PAZ CALLE SOLEDAD 272 60 16320 Collector Asphalt 69 11/6/2023 COACH::53RDAVE::16 53RD AVE CALLE SOLEDAD SHADY LN 714 60 42840 Collector Asphalt 68 11/6/2023 COACH::53RDAVE::17 53RD AVE SHADY LN SHADY LN 155 57 8835 Collector Asphalt 62 11/6/2023 COACH::53RDAVE::18 53RD AVE SHADY LN CDS 1121 32 35872 Collector Asphalt 53 11/6/2023 COACH::53RDAVE::19 53RD AVE FREDERICK ST CALLE LEANDRO 921 42 38668 Collector Asphalt 60 11/6/2023 COACH::53RDAVE::2 53RD AVE CALLE LEANDRO CALLE EMPALME 372 42 15624 Collector Asphalt 100 11/6/2023 COACH::53RDAVE::20 53RD AVE CALLE LEANDRO CALLE EMPALME 360 42 15110 Collector Asphalt 57 11/6/2023 COACH::53RDAVE::3 53RD AVE CALLE EMPALME CALLE TECHA 371 57 21147 Collector Asphalt 87 11/6/2023 COACH::53RDAVE::4 53RD AVE CALLE TECHA CALLE AVILA 370 57 21090 Collector Asphalt 73 11/6/2023 COACH::53RDAVE::5 53RD AVE CALLE AVILA 130' E/O CALLE AVILA 135 37 4995 Collector Asphalt 33 11/6/2023 COACH::53RDAVE::6 53RD AVE 130' W/O CALLE CAMACHO CALLE CAMACHO 135 37 4995 Collector Asphalt 31 11/6/2023 COACH::53RDAVE::7 53RD AVE CALLE CAMACHO 130' E/O CALLE CAMACHO 135 37 4995 Collector Asphalt 39 11/6/2023 COACH::53RDAVE::8 53RD AVE 115' W/O CESAR CHAVEZ ST CESAR CHAVEZ ST 115 37 4255 Collector Asphalt 64 11/6/2023 COACH::53RDAVE::9 53RD AVE CESAR CHAVEZ ST 50' W/O CESAR CHAVEZ ST 85 37 3145 Collector Asphalt 71 11/6/2023 COACH::54THAVE::11 54TH AVE FILLMORE ST 2645' E/O FILLMORE ST 2646 20 52920 Rural Asphalt 16 11/6/2023 COACH::54THAVE::12 54TH AVE 2645' E/O FILLMORE ST CITY LIMITS 1341 20 26820 Rural Asphalt 21 11/6/2023 COACH::54THAVEE::1 54TH AVE VAN BUREN ST SLATE DR 1864 15 27960 Arterial Asphalt 52 11/6/2023 COACH::54THAVEE::10 54TH AVE POLK ST CITY LIMITS 738 30 22140 Arterial Asphalt 31 11/6/2023 COACH::54THAVEE::2 54TH AVE SLATE DR FREDERICK ST 828 15 12420 Arterial Asphalt 54 11/6/2023 COACH::54THAVEE::3 54TH AVE FREDERICK ST SH-86 2639 15 39585 Arterial Asphalt 66 11/6/2023 COACH::54THAVEE::4 54TH AVE SH-86 CALLE BALDERAS 1107 15 16605 Arterial Asphalt 89 11/6/2023 COACH::54THAVEE::5 54TH AVE CALLE BALDERAS SHADY LN 1399 15 20985 Arterial Asphalt 89 11/6/2023 COACH::54THAVEE::6 54TH AVE SHADY LN TYLER ST 2831 12 33972 Arterial Asphalt 77 11/6/2023 COACH::54THAVEE::7 54TH AVE TYLER ST SH-111 3232 25 80800 Arterial Asphalt 97 11/6/2023 COACH::54THAVEE::8 54TH AVE SH-111 ENTERPRISE WAY 1082 36 38952 Arterial Asphalt 58 11/6/2023 COACH::54THAVEE::9 54TH AVE ENTERPRISE WAY POLK ST 1014 36 36504 Arterial Asphalt 70 11/6/2023 COACH::54THAVEW::1 54TH AVE POLK ST CITY LIMITS 738 30 22140 Arterial Asphalt 51 11/6/2023 COACH::54THAVEW::10 54TH AVE SLATE DR VAN BUREN ST 1864 15 27960 Arterial Asphalt 39 11/6/2023 COACH::54THAVEW::2 54TH AVE ENTERPRISE WAY POLK ST 1014 36 36504 Arterial Asphalt 60 11/6/2023 COACH::54THAVEW::3 54TH AVE SH-111 ENTERPRISE WAY 1093 36 39348 Arterial Asphalt 58 11/6/2023 COACH::54THAVEW::4 54TH AVE SH-111 TYLER ST 3221 25 80525 Arterial Asphalt 93 11/6/2023 COACH::54THAVEW::5 54TH AVE TYLER ST SHADY LN 2831 12 33972 Arterial Asphalt 92 11/6/2023 COACH::54THAVEW::6 54TH AVE SHADY LN CALLE BALDERAS 1399 15 20985 Arterial Asphalt 51 11/6/2023 COACH::54THAVEW::7 54TH AVE CALLE BALDERAS SH-86 1107 15 16605 Arterial Asphalt 72 11/6/2023 COACH::54THAVEW::8 54TH AVE SH-86 FREDERICK ST 2639 15 39585 Arterial Asphalt 52 11/6/2023 COACH::54THAVEW::9 54TH AVE FREDERICK ST SLATE DR 828 15 12420 Arterial Asphalt 55 11/6/2023 COACH::55THAVE::1 55TH AVE CITY LIMITS VAN BUREN ST 1321 10 13210 Collector Asphalt 44 11/6/2023 COACH::55THAVE::2 55TH AVE FILLMORE ST 1330' E/O FILLMORE ST 1327 20 26540 Rural Asphalt 61 11/6/2023 COACH::55THAVE::3 55TH AVE 1330' E/O FILLMORE ST 2660' E/O FILLMORE ST 1329 20 26580 Rural Asphalt 47 11/6/2023 COACH::55THAVE::4 55TH AVE 2675' W/O PEIRCE ST PIERCE ST 2672 20 53440 Rural Asphalt 47 11/6/2023 COACH::5THST::1 5TH ST D/E PALM AVE 387 56 21672 Collector Asphalt 35 11/6/2023 COACH::5THST::2 5TH ST PALM AVE ORCHARD AVE 425 56 23800 Collector Asphalt 56 11/6/2023 COACH::5THST::3 5TH ST VINE AVE SH-111 453 56 25368 Collector Asphalt 43 11/6/2023 COACH::6THST::1 6TH ST SH-86 TRIPOLI WAY 358 56 20048 Collector Asphalt 43 11/6/2023 COACH::6THST::2 6TH ST TRIPOLI WAY DATE AVE 366 56 20496 Collector Asphalt 99 11/6/2023 COACH::6THST::3 6TH ST DATE AVE PALM AVE 787 56 44072 Collector Asphalt 98 11/6/2023 COACH::6THST::4 6TH ST PALM AVE ORCHARD AVE 425 56 23800 Collector Asphalt 57 11/6/2023 COACH::6THST::5 6TH ST ORCHARD AVE VINE AVE 425 56 23800 Collector Asphalt 71 11/6/2023 COACH::6THST::6 6TH ST VINE AVE SH-111 453 56 25368 Collector Asphalt 69 11/6/2023 COACH::7THST::1 7TH ST TRIPOLI WAY DATE AVE 366 56 20496 Collector Asphalt 57 11/6/2023 COACH::7THST::2 7TH ST DATE AVE PALM AVE 788 56 44128 Collector Asphalt 60 11/6/2023 COACH::7THST::3 7TH ST PALM AVE ORCHARD AVE 424 56 23744 Collector Asphalt 54 11/6/2023 COACH::7THST::4 7TH ST ORCHARD AVE VINE AVE 424 56 23744 Collector Asphalt 36 11/6/2023 COACH::7THST::5 7TH ST VINE AVE SH-111 454 56 25424 Collector Asphalt 54 11/6/2023 COACH::8THST::1 8TH ST DATE AVE PENDLETON WAY 400 56 22400 Collector Asphalt 65 11/6/2023 COACH::8THST::2 8TH ST ORCHARD AVE VINE AVE 424 56 23744 Collector Asphalt 51 11/6/2023 COACH::8THST::3 8TH ST VINE AVE SH-111 454 56 25424 Collector Asphalt 51 11/6/2023 COACH::9THST::1 9TH ST BAGDAD AVE ORCHARD AVE 1029 56 57624 Collector Asphalt 62 11/6/2023 COACH::9THST::2 9TH ST ORCHARD AVE VINE AVE 424 56 23744 Collector Asphalt 87 11/6/2023 COACH::9THST::3 9TH ST VINE AVE SHADY LN 105 56 5880 Collector Asphalt 86 11/6/2023 COACH::9THST::4 9TH ST SHADY LN SH-111 333 56 18648 Collector Asphalt 100 11/6/2023 COACH::ADAMLN::1 ADAM LN 53RD AVE CDS 603 40 24120 Residential Asphalt 54 11/6/2023 COACH::ADRIANACT::1 ADRIANA CT AVENIDA ALEENAH CDS 234 36 8424 Residential Asphalt 65 11/6/2023 COACH::AGUABLANCA::1 AGUA BLANCA AVE AGUA CALIENTE ST LUNA DE NICOLETA ST 290 36 10440 Residential Asphalt 73 11/6/2023 COACH::AGUABLANCA::2 AGUA BLANCA AVE LUNA DE NICOLETA ST CAMINO MAYA 280 36 10080 Residential Asphalt 73 11/6/2023 COACH::AGUABLANCA::3 AGUA BLANCA AVE CAMINO MAYA CAMINO REAL 280 36 10080 Residential Asphalt 72 11/6/2023 COACH::AGUABLANCA::4 AGUA BLANCA AVE CAMINO REAL CHICHEN ITZA RD 280 36 10080 Residential Asphalt 77 11/6/2023 COACH::AGUACALIEN::1 AGUA CALIENTE ST AGUA BLANCA AVE CAMINO LAS BRISAS 180 37 6660 Residential Asphalt 63 11/6/2023 COACH::AGUACALIEN::2 AGUA CALIENTE ST CAMINO LAS BRISAS CALLE COLIMA 546 37 20202 Residential Asphalt 75 11/6/2023 COACH::AIRPORTBL::1 AIRPORT BLVD CITY LIMITS VAN BUREN ST 1321 43 56803 Collector Asphalt 100 11/6/2023 COACH::AIRPORTBL::2 AIRPORT BLVD CITY LIMITS 2640' W/O FILLMORE ST 185 50 9250 Collector Asphalt 91 11/6/2023 COACH::AIRPORTBL::3 AIRPORT BLVD 2640' W/O FILLMORE ST 1830' W/O FILLMORE ST 809 50 40450 Collector Asphalt 83 11/6/2023 COACH::AIRPORTBL::4 AIRPORT BLVD 1830' W/O FILLMORE ST 1395' W/O FILLMORE ST 435 50 21750 Collector Asphalt 90 11/6/2023 COACH::AIRPORTBL::5 AIRPORT BLVD 1395' W/O FILLMORE ST 1215' W/O FILLMORE ST 178 50 8900 Collector Asphalt 84 11/6/2023 COACH::AIRPORTBL::6 AIRPORT BLVD 1215' W/O FILLMORE ST 1085' W/O FILLMORE ST 130 50 6500 Collector PCC 100 11/6/2023 COACH::AIRPORTBL::7 AIRPORT BLVD 1085' W/O FILLMORE ST 860' W/O FILLMORE ST 226 50 11300 Collector Asphalt 88 11/6/2023 COACH::AIRPORTBL::8 AIRPORT BLVD 860' W/O FILLMORE ST FILLMORE ST 858 28 24024 Collector Asphalt 67 11/6/2023 COACH::AIRPORTBL::9 AIRPORT BLVD FILLMORE ST CITY LIMITS 670 28 18760 Collector Asphalt 82 11/6/2023 COACH::ALLENDEDR::1 ALLENDE DR D/E PROSECCO WAY 251 32 8032 Residential Asphalt 42 11/6/2023 COACH::ALLENDEDR::2 ALLENDE DR PROSECCO WAY SOLARCE ST 293 32 9376 Residential Asphalt 55 11/6/2023 COACH::ALLENDEDR::3 ALLENDE DR SOLARCE ST ALLENDE DR 469 32 15008 Residential Asphalt 41 11/6/2023 COACH::ALLENDEDR::4 ALLENDE DR ALLENDE DR VERMOUTH DR 99 32 3168 Residential Asphalt 15 11/6/2023 COACH::ALLENDEDR::5 ALLENDE DR ALLENDE DR VERMOUTH DR 347 32 11104 Residential Asphalt 30 11/6/2023 COACH::ALLEY::1 ALLEY 3RD ST ALLEY 188 20 3760 Alley Gravel N/A COACH::ALLEY::10 ALLEY ALLEY TRIPOLI WAY 140 20 2800 Residential Gravel N/A COACH::ALLEY::11 ALLEY PALM AVE ORCHARD AVE 425 20 8500 Alley Gravel N/A COACH::ALLEY::12 ALLEY ORCHARD AVE VINE AVE 425 20 8500 Alley Gravel N/A COACH::ALLEY::13 ALLEY ORCHARD AVE VINE AVE 425 20 8500 Alley Gravel N/A COACH::ALLEY::14 ALLEY VINE AVE ALLEY 244 16 3904 Alley Gravel N/A COACH::ALLEY::15 ALLEY VINE AVE ALLEY 244 20 4880 Alley Gravel N/A COACH::ALLEY::16 ALLEY ALLEY 2ND ST 188 24 4512 Alley Gravel N/A COACH::ALLEY::17 ALLEY 2ND ST ALLEY 188 20 3760 Alley Gravel N/A COACH::ALLEY::2 ALLEY 52ND AVE ALLEY 545 30 16350 Alley PCC 63 11/6/2023 COACH::ALLEY::3 ALLEY SH-86 ALLEY 521 26 13546 Alley Gravel N/A COACH::ALLEY::4 ALLEY SH-86 PALM AVE 380 18 6840 Alley Gravel N/A COACH::ALLEY::5 ALLEY CAIRO AVE '150 N/O CAIRO AVE 149 20 2980 Alley Gravel N/A COACH::ALLEY::6 ALLEY '150 S/O DEMASCUS AVE DAMASCUS AVE 149 20 2980 Alley Gravel N/A COACH::ALLEY::7 ALLEY DAMASCUS AVE '200 N/O DAMASCUS AVE 199 20 3980 Residential Gravel N/A COACH::ALLEY::8 ALLEY D\E PALM AVE 387 20 7740 Alley Gravel N/A COACH::ALLEY::9 ALLEY PALM AVE ORCHARD AVE 426 18 7668 Alley Gravel N/A COACH::AMAPOLALN::1 AMAPOLA LN CDS HIBISCO ST 344 37 12728 Residential Asphalt 49 11/6/2023 COACH::AMARONECIR::1 AMARONE CIR MALVASIA WAY CDS 180 32 5760 Residential Asphalt 56 11/6/2023 COACH::AMETHYSTCT::1 AMETHYST CT CDS SCARLET WAY 410 36 14760 Residential Asphalt 83 11/6/2023 COACH::ANDREALN::1 ANDREA LN JULIA DR LINDA AVE 260 37 9620 Residential Asphalt 86 11/6/2023 COACH::ANDREALN::2 ANDREA LN LINDA AVE CHRISTINA RD 259 37 9583 Residential Asphalt 69 11/6/2023 COACH::ANDREALN::3 ANDREA LN CHRISTINA RD '45' N/O CHRISTINA RD 45 37 1665 Residential Asphalt 100 11/6/2023 COACH::ANDREALN::4 ANDREA LN '45' N/O CHRISTINA RD CDS 377 37 13949 Residential Asphalt 85 11/6/2023 COACH::ARABYAVE::1 ARABY AVE TRIPOLI WAY DATE AVE 660 38 25080 Residential Surface Treatment 75 11/6/2023 COACH::ARABYAVE::2 ARABY AVE DATE AVE SHADY LN 1338 39 52182 Residential Surface Treatment 72 11/6/2023 A2
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::ARICADR::1 ARICA DR MCCOY PEAK AVE QUAIL MOUNTAIN TER 616 36 22176 Residential Asphalt 68 11/6/2023 COACH::ASHLERCT::1 ASHLER CT COPPERIDGE ST CDS 337 37 12469 Residential Asphalt 41 11/6/2023 COACH::AADOBE::1 AVENIDA ADOBE 51ST AVE CALLE CATHRON 174 40 6960 Residential Asphalt 12 11/6/2023 COACH::AADOBE::10 AVENIDA ADOBE 215' S/O CHRISTINA RD CHRISTINA RD 214 36 7704 Residential Asphalt 33 11/6/2023 COACH::AADOBE::11 AVENIDA ADOBE CHRISTINA RD 45' N/O CHRISTINA RD 45 36 1620 Residential Asphalt 45 11/6/2023 COACH::AADOBE::12 AVENIDA ADOBE 45' N/O CHRISTINA RD PEDRO DR 408 36 14688 Residential Asphalt 65 11/6/2023 COACH::AADOBE::2 AVENIDA ADOBE CALLE CATHRON CORTE CINDARELLA 239 40 9560 Residential Asphalt 55 11/6/2023 COACH::AADOBE::3 AVENIDA ADOBE CORTE CINDARELLA CORTE BERNARDO 289 40 11560 Residential Asphalt 49 11/6/2023 COACH::AADOBE::4 AVENIDA ADOBE CORTE BERNARDO VIA ZAHIDI 256 40 10240 Residential Asphalt 52 11/6/2023 COACH::AADOBE::5 AVENIDA ADOBE VIA ZAHIDI CORTE ALTURIAN 258 40 10320 Residential Asphalt 60 11/6/2023 COACH::AADOBE::6 AVENIDA ADOBE CORTE ALTURIAN WESTERFIELD WAY 128 40 5120 Residential Asphalt 57 11/6/2023 COACH::AADOBE::7 AVENIDA ADOBE WESTERFIELD WAY JULIA DR 149 36 5364 Residential Asphalt 36 11/6/2023 COACH::AADOBE::8 AVENIDA ADOBE JULIA DR LINDA AVE 259 36 9324 Residential Asphalt 58 11/6/2023 COACH::AADOBE::9 AVENIDA ADOBE LINDA AVE 215' S/O CHRISTINA RD 45 36 1620 Residential Asphalt 46 11/6/2023 COACH::AALEENAH::1 AVENIDA ALEENAH GENOA ST '150 E/O GENOA ST 149 36 5364 Residential Asphalt 52 11/6/2023 COACH::AALEENAH::2 AVENIDA ALEENAH '150 E/O GENOA ST ADRIANA CT 148 36 5328 Residential Asphalt 60 11/6/2023 COACH::AALEENAH::3 AVENIDA ALEENAH ADRIANA CT JULIA CT 392 36 14112 Residential Asphalt 58 11/6/2023 COACH::AALEENAH::4 AVENIDA ALEENAH JULIA CT '160 W/O CALLE FLORENA 99 36 3564 Residential Asphalt 58 11/6/2023 COACH::AALEENAH::5 AVENIDA ALEENAH '160 W/O CALLE FLORENA CALLE FLORENA 160 36 5760 Residential Asphalt 62 11/6/2023 COACH::AALEENAH::6 AVENIDA ALEENAH CALLE FLORENA '150 E/O CALLE FLORENA 148 36 5328 Residential Asphalt 74 11/6/2023 COACH::AALEENAH::7 AVENIDA ALEENAH '150 E/O CALLE FLORENA CALLE EMELIA 1021 36 36756 Residential Asphalt 57 11/6/2023 COACH::ACAMPANAS::1 AVENIDA CAMPANAS CALLE FRONTERA CAMINO CONVENTO 267 36 9612 Residential Asphalt 100 11/6/2023 COACH::ACAMPANAS::2 AVENIDA CAMPANAS CAMINO CONVENTO CAMINO ROSARIO 277 36 9972 Residential Asphalt 100 11/6/2023 COACH::ACAMPANAS::3 AVENIDA CAMPANAS CAMINO ROSARIO CAMINO MAGDALENA 289 36 10404 Residential Asphalt 100 11/6/2023 COACH::ACAMPANAS::4 AVENIDA CAMPANAS CAMINO MAGDALENA CALLE XAVIER 176 36 6336 Residential Asphalt 100 11/6/2023 COACH::ACEDRUS::1 AVENIDA CEDRUS CALLE CARMELLO CALLE TECOMARIA 560 36 20160 Residential Asphalt 54 11/6/2023 COACH::ACORTEZ::1 AVENIDA CORTEZ VERA CRUZ VIA HERMOSA 238 36 8568 Residential Asphalt 100 11/6/2023 COACH::ACORTEZ::2 AVENIDA CORTEZ VIA HERMOSA VIA DURANGO 243 36 8748 Residential Asphalt 68 11/6/2023 COACH::ACORTEZ::3 AVENIDA CORTEZ VIA DURANGO PASEO LAREDO 239 36 8604 Residential Asphalt 77 11/6/2023 COACH::ACORTEZ::4 AVENIDA CORTEZ PASEO LAREDO CALLE LEON 332 36 11952 Residential Asphalt 77 11/6/2023 COACH::ACRYSTAL::1 AVENIDA CRYSTAL CALLE DANIELLE CALLE ANABELLA 472 30 14160 Residential Asphalt 66 11/6/2023 COACH::ADEORO::1 AVENIDA DE ORO 50TH AVE AVENIDA DEL PARQUE 695 37 25715 Collector Asphalt 87 11/6/2023 COACH::ADEORO::2 AVENIDA DE ORO AVENIDA DEL PARQUE GUITRON ST 810 37 29970 Collector Asphalt 87 11/6/2023 COACH::ADEPLATA::1 AVENIDA DE PLATA 50TH AVE VIA CONCHILLA 553 40 22120 Residential Asphalt 32 11/6/2023 COACH::ADEPLATINA::1 AVENIDA DE PLATINA 50TH AVE VIA CONCHILLA 554 40 22160 Residential Asphalt 40 11/6/2023 COACH::ADELPARQUE::1 AVENIDA DEL PARQUE PEDRO DR 50TH AVE 200 40 8000 Residential Asphalt 61 11/6/2023 COACH::ADELPARQUE::2 AVENIDA DEL PARQUE 50TH AVE COURTE DEL PARQUE 574 40 22960 Residential Asphalt 99 11/6/2023 COACH::ADELPARQUE::3 AVENIDA DEL PARQUE COURTE DEL PARQUE AVENIDA DE ORO 472 40 18880 Residential Asphalt 86 11/6/2023 COACH::ADELPRADO::1 AVENIDA DEL PRADO CALLE RUIZ SHADY LN 927 38 35226 Residential Surface Treatment 93 11/6/2023 COACH::ADELROBLE::1 AVENIDA DEL ROBLE CALLE SANBORN AVENIDA DEL ROBLE 923 38 35074 Residential Surface Treatment 91 11/6/2023 COACH::ADELROBLE::2 AVENIDA DEL ROBLE AVENIDA DEL ROBLE AVENIDA YUCATECO 240 38 9120 Residential Surface Treatment 88 11/6/2023 COACH::AELFAROL::1 AVENIDA EL FAROL CALLE BALDERAS CALLE SANBORN 240 36 8640 Residential Surface Treatment 88 11/6/2023 COACH::AELFAROL::2 AVENIDA EL FAROL CALLE SANBORN CALLE RUIZ 240 36 8640 Residential Surface Treatment 86 11/6/2023 COACH::AEUROPA::1 AVENIDA EUROPA D\E CALLE CARMELLO 137 36 4932 Residential Asphalt 51 11/6/2023 COACH::AEUROPA::2 AVENIDA EUROPA CALLE CARMELLO CALLE TECOMARIA 560 36 20160 Residential Asphalt 52 11/6/2023 COACH::AFLORABUND::1 AVENIDA FLORABUNDA CALLE CARMELLO CALLE ABELIA 124 36 4464 Residential Asphalt 47 11/6/2023 COACH::AFLORABUND::2 AVENIDA FLORABUNDA CALLE ABELIA CALLE TECOMARIA 437 36 15732 Residential Asphalt 41 11/6/2023 COACH::AFLORABUND::3 AVENIDA FLORABUNDA CALLE TECOMARIA CALLE ELDARICA 280 36 10080 Residential Asphalt 61 11/6/2023 COACH::AFLORABUND::4 AVENIDA FLORABUNDA CALLE ELDARICA CALLE CANTARA 280 36 10080 Residential Asphalt 58 11/6/2023 COACH::AGRACE::1 AVENIDA GRACE CALLE JOYCE CALLE FLORENA 666 36 23976 Residential Asphalt 64 11/6/2023 COACH::AGRACE::2 AVENIDA GRACE CALLE FLORENA 150' E/O CALLE FLORENA 150 36 5400 Residential Asphalt 56 11/6/2023 COACH::AGRACE::3 AVENIDA GRACE 150' E/O CALLE FLORENA CALLE EMELIA 1022 36 36792 Residential Asphalt 40 11/6/2023 COACH::AHALAWAY::1 AVENIDA HALAWAY FREDERICK ST AVENIDA RAZON 174 36 6264 Residential Asphalt 61 11/6/2023 COACH::ALALUNA::1 AVENIDA LA LUNA CALLE OCASO CALLE EL SOL 957 37 35409 Residential Asphalt 52 11/6/2023 COACH::AMARIA::1 AVENIDA MARIA GENOA ST CALLE DANIELLE 509 33 16797 Residential Asphalt 58 11/6/2023 COACH::AMARIA::2 AVENIDA MARIA CALLE DANIELLE CALLE ANABELLA 497 33 16401 Residential Asphalt 74 11/6/2023 COACH::AMARIA::3 AVENIDA MARIA CALLE ANABELLA CALLE ALICIA 190 33 6270 Residential Asphalt 68 11/6/2023 COACH::ANERIUM::1 AVENIDA NERIUM CALLE CARMELLO CALLE GLORIOSA 330 36 11880 Residential Asphalt 47 11/6/2023 COACH::ANERIUM::2 AVENIDA NERIUM CALLE GLORIOSA CALLE TECOMARIA 230 36 8280 Residential Asphalt 65 11/6/2023 COACH::ANERIUM::3 AVENIDA NERIUM CALLE TECOMARIA CALLE ELDARICA 280 36 10080 Residential Asphalt 65 11/6/2023 COACH::ANERIUM::4 AVENIDA NERIUM CALLE ELDARICA CALLE CANTARA 280 36 10080 Residential Asphalt 64 11/6/2023 COACH::ANICOLE::1 AVENIDA NICOLE CALLE ALICIA CATARINA CT 287 36 10332 Residential Asphalt 68 11/6/2023 COACH::ANICOLE::2 AVENIDA NICOLE CATARINA CT MICHELLE DR 287 36 10332 Residential Asphalt 70 11/6/2023 COACH::ARAYLYNN::1 AVENIDA RAYLYNN GENOA ST CALLE JOYCE 280 36 10080 Residential Asphalt 59 11/6/2023 COACH::ARAYLYNN::2 AVENIDA RAYLYNN CALLE JOYCE CALLE FLORENA 673 36 24228 Residential Asphalt 54 11/6/2023 COACH::ARAYLYNN::3 AVENIDA RAYLYNN CALLE FLORENA 150' E/O CALLE FLORENA 144 36 5184 Residential Asphalt 25 11/6/2023 COACH::ARAYLYNN::4 AVENIDA RAYLYNN 150' E/O CALLE FLORENA CALLE EMELIA 1022 36 36792 Residential Asphalt 47 11/6/2023 COACH::ARAZON::1 AVENIDA RAZON CALLE CATHRON CORTE YAGER 255 37 9435 Residential Asphalt 71 11/6/2023 COACH::ARAZON::2 AVENIDA RAZON CORTE YAGER CORTE GILLAN 250 37 9250 Residential Asphalt 60 11/6/2023 COACH::ARAZON::3 AVENIDA RAZON CORTE GILLAN AVENIDA HALAWAY 125 37 4625 Residential Asphalt 57 11/6/2023 COACH::ARAZON::4 AVENIDA RAZON AVENIDA HALAWAY VIA ZAHIDI 130 37 4810 Residential Asphalt 68 11/6/2023 COACH::ARAZON::5 AVENIDA RAZON VIA ZAHIDI CDS 220 37 8140 Residential Asphalt 62 11/6/2023 COACH::AREFORMA::1 AVENIDA REFORMA CALLE RUIZ SHADY LN 925 36 33300 Residential Surface Treatment 90 11/6/2023 COACH::ASANDOMING::1 AVENIDA SAN DOMINGO CAMINO FRONTERA CAMINO CORAS 267 37 9879 Residential Asphalt 94 11/6/2023 COACH::ASANDOMING::2 AVENIDA SAN DOMINGO CAMINO CORAS CAMINO EL FARO 277 37 10249 Residential Asphalt 100 11/6/2023 COACH::ASANDOMING::3 AVENIDA SAN DOMINGO CAMINO EL FARO CAMINO LORETO 289 37 10693 Residential Asphalt 66 11/6/2023 COACH::ASANDOMING::4 AVENIDA SAN DOMINGO CAMINO LORETO CALLE XAVIER 169 37 6253 Residential Asphalt 100 11/6/2023 COACH::ATACUBA::1 AVENIDA TACUBA CALLE RUIZ SHADY LN 923 37 34151 Residential Surface Treatment 92 11/6/2023 COACH::AVERANO::1 AVENIDA VERANO CALLE OCASO CALLE PUERTA DEL SOL 484 37 17908 Residential Asphalt 71 11/6/2023 COACH::AVERANO::2 AVENIDA VERANO CALLE PUERTA DEL SOL CALLE EL SOL 475 37 17575 Residential Asphalt 54 11/6/2023 COACH::AVERONICA::1 AVENIDA VERONICA GENOA ST CALLE FLORENA 947 37 35039 Residential Asphalt 52 11/6/2023 COACH::AVESTAGO::1 AVENIDA VESTAGO REDONDO ESTE FREDERICK ST 201 46 9246 Residential Asphalt 55 11/6/2023 COACH::AYUCATECO::1 AVENIDA YUCATECO CALLE RUIZ AVENIDA DEL ROBLE 680 37 25160 Residential Surface Treatment 90 11/6/2023 COACH::AYUCATECO::2 AVENIDA YUCATECO AVENIDA DEL ROBLE SHADY LN 241 37 8917 Residential Surface Treatment 93 11/6/2023 COACH::AZOCALO::1 AVENIDA ZOCALO CALLE BALDERAS CALLE SANBORN 240 36 8640 Residential Surface Treatment 92 11/6/2023 COACH::AZOCALO::2 AVENIDA ZOCALO CALLE SANBORN CALLE RUIZ 240 36 8640 Residential Surface Treatment 91 11/6/2023 COACH::AVENUE49::1 AVENUE 49 CALHOUN ST GARNET RIDGE ST 468 38 17784 Collector Asphalt 79 11/6/2023 COACH::AVENUE49::2 AVENUE 49 GARNET RIDGE ST D/E 854 38 32452 Collector Asphalt 100 11/6/2023 COACH::AVENUE53::1 AVENUE 53 SHADY LN 1000' E/O CALLE EMELIA 1663 57 94791 Collector Asphalt 68 11/6/2023 COACH::AVENUE53::2 AVENUE 53 1000' E/O CALLE EMELIA CALLE EMELIA 995 57 56715 Collector Asphalt 61 11/6/2023 COACH::AVENUE53::3 AVENUE 53 CALLE EMELIA TYLER ST 316 57 18012 Collector Asphalt 73 11/6/2023 COACH::BAGDADAVE::1 BAGDAD AVE DOUMA ST LIBNAN ST 664 40 26560 Residential Asphalt 61 11/6/2023 COACH::BAGDADAVE::10 BAGDAD AVE TRIPOLI WAY DATE AVE 311 40 12440 Collector Asphalt 58 11/6/2023 COACH::BAGDADAVE::11 BAGDAD AVE DATE AVE DATE AVE 312 40 12480 Collector Asphalt 69 11/6/2023 COACH::BAGDADAVE::12 BAGDAD AVE DATE AVE 9TH ST 59 40 2360 Collector Asphalt 100 11/6/2023 COACH::BAGDADAVE::13 BAGDAD AVE 9TH ST SHADY LN 1258 40 50320 Collector Asphalt 56 11/6/2023 COACH::BAGDADAVE::14 BAGDAD AVE SHADY LN SHADY LN 20 40 800 Collector Asphalt 100 11/6/2023 COACH::BAGDADAVE::15 BAGDAD AVE SHADY LN GENOA ST 523 40 20920 Collector Asphalt 69 11/6/2023 COACH::BAGDADAVE::16 BAGDAD AVE GENOA ST SH-111 528 40 21120 Collector Asphalt 56 11/6/2023 COACH::BAGDADAVE::2 BAGDAD AVE LIBNAN ST MECCA LANE 130 40 5200 Residential Asphalt 68 11/6/2023 COACH::BAGDADAVE::3 BAGDAD AVE MECCA LANE CALLE AVILA 537 40 21480 Residential Asphalt 58 11/6/2023 COACH::BAGDADAVE::4 BAGDAD AVE CALLE AVILA CALLE CAMACHO 313 40 12520 Residential Asphalt 25 11/6/2023 COACH::BAGDADAVE::5 BAGDAD AVE CALLE CAMACHO SUEZ RD 156 40 6240 Residential Asphalt 54 11/6/2023 COACH::BAGDADAVE::6 BAGDAD AVE SUEZ RD SH-86 214 40 8560 Residential Asphalt 59 11/6/2023 COACH::BAGDADAVE::7 BAGDAD AVE SH-86 ALLEY 214 40 8560 Collector Asphalt 91 11/6/2023 COACH::BAGDADAVE::8 BAGDAD AVE PARKING LOT ENTRANCE TRIPOLI WAY 444 40 17760 Collector Asphalt 65 11/6/2023 COACH::BAGDADAVE::9 BAGDAD AVE TRIPOLI WAY TRIPOLI WAY 38 40 1520 Collector Asphalt 100 11/6/2023 COACH::BAJAWAY::1 BAJA WAY CHIAPAS DR FREDERICK ST 250 30 7500 Residential Asphalt 60 11/6/2023 COACH::BALBOAST::1 BALBOA ST D/E 50TH AVE 671 40 26840 Residential Asphalt 72 11/6/2023 COACH::BELLAROMA::1 BELLA ROMA LN D/E BELLISSIMA AVE 809 32 25888 Residential Asphalt 59 11/6/2023 COACH::BELLISSIMA::1 BELLISSIMA AVE FREDERICK ST MODENA TER 176 35 6160 Residential Asphalt 69 11/6/2023 COACH::BELLISSIMA::2 BELLISSIMA AVE MODENA TER BELLA ROMA LN 688 35 24080 Residential Asphalt 57 11/6/2023 COACH::BELLISSIMA::3 BELLISSIMA AVE BELLA ROMA LN CALLE EMPALME 454 35 15890 Residential Asphalt 54 11/6/2023 COACH::BIGBEARPL::1 BIG BEAR PL CHARLTON PEAK ST CHIRIACO SUMMIT ST 260 36 9360 Residential Asphalt 67 11/6/2023 COACH::BRENDALN::1 BRENDA LN CDS SHADY LN 634 38 24092 Residential Surface Treatment 55 11/6/2023 COACH::BRIANNELN::1 BRIANNE LN CALENDULA AVE CALENDULA AVE 5 37 185 Residential Asphalt 100 11/6/2023 COACH::BRIANNELN::2 BRIANNE LN CALENDULA AVE MAGNOLIA ST 253 37 9361 Residential Asphalt 63 11/6/2023 COACH::BRIANNELN::3 BRIANNE LN MAGNOLIA ST FIESTA RD 255 37 9435 Residential Asphalt 64 11/6/2023 COACH::BRIANNELN::4 BRIANNE LN FIESTA RD TERA VISTA 256 37 9472 Residential Asphalt 67 11/6/2023 COACH::BRIANNELN::5 BRIANNE LN TERA VISTA MEADOWS LN 258 37 9546 Residential Asphalt 65 11/6/2023 COACH::CAIROAVE::1 CAIRO AVE CALLE EMPALME CALLE TECHA 264 40 10560 Residential Asphalt 48 11/6/2023 COACH::CAIROAVE::2 CAIRO AVE CALLE TECHA CALLE AVILA 261 40 10440 Residential Asphalt 43 11/6/2023 COACH::CAIROAVE::3 CAIRO AVE CALLE AVILA CALLE CAMACHO 313 40 12520 Residential Asphalt 44 11/6/2023 COACH::CAIROAVE::4 CAIRO AVE CALLE CAMACHO SUEZ RD 156 40 6240 Residential Asphalt 51 11/6/2023 COACH::CAIROAVE::5 CAIRO AVE SH-86 ALLEY 214 44 9416 Residential Surface Treatment 43 11/6/2023 COACH::CAIROAVE::6 CAIRO AVE SUEZ RD SH-86 214 40 8560 Residential Asphalt 55 11/6/2023 COACH::CAIROAVE::7 CAIRO AVE ALLEY TRIPOLI WAY 447 37 16539 Residential Surface Treatment 68 11/6/2023 COACH::CAIROAVE::8 CAIRO AVE TRIPOLI WAY DATE AVE 660 38 25080 Residential Surface Treatment 70 11/6/2023 COACH::CAIROAVE::9 CAIRO AVE DATE AVE SHADY LN 1338 40 53520 Residential Surface Treatment 72 11/6/2023 COACH::CALENDULA::1 CALENDULA AVE SUMMER ST BRIANNE LN 977 37 36149 Residential Asphalt 67 11/6/2023 COACH::CALENDULA::2 CALENDULA AVE BRIANNE LN JAZMIN ST 271 37 10027 Residential Asphalt 68 11/6/2023 COACH::CALENDULA::3 CALENDULA AVE JAZMIN ST TULIPAN ST 259 37 9583 Residential Asphalt 16 11/6/2023 COACH::CALENDULA::4 CALENDULA AVE TULIPAN ST ORQUIDEA LN 253 37 9361 Residential Asphalt 44 11/6/2023 COACH::CALENDULA::5 CALENDULA AVE ORQUIDEA LN NARCISO LN 255 37 9435 Residential Asphalt 28 11/6/2023 A3
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::CALENDULA::6 CALENDULA AVE NARCISO LN HIBISCO ST 264 37 9768 Residential Asphalt 32 11/6/2023 COACH::CALHOUNST::1 CALHOUN ST CITY LIMITS 52ND AVE 629 24 15096 Collector Asphalt 99 11/6/2023 COACH::CALHOUNST::10 CALHOUN ST EAGLE AVE EL MAR AVE 425 62 26350 Collector Asphalt 63 11/6/2023 COACH::CALHOUNST::11 CALHOUN ST EL MAR AVE 48TH AVE 655 62 40610 Collector Asphalt 78 11/6/2023 COACH::CALHOUNST::12 CALHOUN ST CITY LIMITS VIA PICON 527 30 15817 Collector Asphalt 57 11/6/2023 COACH::CALHOUNST::13 CALHOUN ST VIA PICON 50TH AVE 775 30 23250 Collector Asphalt 57 11/6/2023 COACH::CALHOUNST::2 CALHOUN ST 52ND AVE CITY LIMITS 686 24 16464 Collector Asphalt 99 11/6/2023 COACH::CALHOUNST::3 CALHOUN ST CITY LIMITS VIA PICON 542 30 16260 Collector Asphalt 96 11/6/2023 COACH::CALHOUNST::4 CALHOUN ST VIA PICON 50TH AVE 794 30 23820 Collector Asphalt 97 11/6/2023 COACH::CALHOUNST::5 CALHOUN ST 50TH AVE SHADOWROCK DR 777 62 48174 Collector Asphalt 69 11/6/2023 COACH::CALHOUNST::6 CALHOUN ST SHADOWROCK DR LAS PLUMAS CT 317 62 19654 Collector Asphalt 52 11/6/2023 COACH::CALHOUNST::7 CALHOUN ST LAS PLUMAS CT AVENUE 49 1685 62 104470 Collector Asphalt 88 11/6/2023 COACH::CALHOUNST::8 CALHOUN ST AVENUE 49 SAN IGNACIO AVE 763 62 47306 Collector Asphalt 75 11/6/2023 COACH::CALHOUNST::9 CALHOUN ST SAN IGNACIO AVE EAGLE AVE 787 62 48794 Collector Asphalt 82 11/6/2023 COACH::CABELIA::1 CALLE ABELIA 49TH AVE AVENIDA FLORABUNDA 290 48 13920 Residential Asphalt 59 11/6/2023 COACH::CALICIA::1 CALLE ALICIA AVENIDA NICOLE MICHELLE DR 535 30 16050 Residential Asphalt 62 11/6/2023 COACH::CALICIA::2 CALLE ALICIA MICHELLE DR AVENIDA MARIA 109 30 3270 Residential Asphalt 72 11/6/2023 COACH::CAMIGOS::1 CALLE AMIGOS CALLE LA PAZ CDS 429 36 15444 Residential Asphalt 70 11/6/2023 COACH::CANABELLA::1 CALLE ANABELLA AVENIDA MARIA AVENIDA CRYSTAL 330 30 9900 Residential Asphalt 74 11/6/2023 COACH::CAVILA::1 CALLE AVILA D/E CALLE NOGAL 126 40 5040 Residential Asphalt 87 11/6/2023 COACH::CAVILA::2 CALLE AVILA CALLE NOGAL CALLE PINO 349 40 13960 Residential Asphalt 84 11/6/2023 COACH::CAVILA::3 CALLE AVILA CALLE PINO 53RD AVE 185 40 7400 Residential Asphalt 84 11/6/2023 COACH::CAVILA::4 CALLE AVILA 53RD AVE CALLE ZAMORA 661 40 26440 Residential Asphalt 74 11/6/2023 COACH::CAVILA::5 CALLE AVILA CALLE VERDE CALLE ROJO 648 40 25920 Residential Asphalt 71 11/6/2023 COACH::CAVILA::6 CALLE AVILA CALLE ROJO 52ND AVE 607 40 24280 Residential Asphalt 47 11/6/2023 COACH::CAVILA::7 CALLE AVILA 52ND AVE CAIRO AVE 678 40 27120 Residential Asphalt 37 11/6/2023 COACH::CAVILA::8 CALLE AVILA CAIRO AVE BAGDAD AVE 666 40 26640 Residential Asphalt 70 11/6/2023 COACH::CBALDERAS::1 CALLE BALDERAS 54TH AVE AVENIDA ZOCALO 783 36 28188 Residential Surface Treatment 88 11/6/2023 COACH::CBALDERAS::2 CALLE BALDERAS AVENIDA ZOCALO AVENIDA EL FAROL 502 36 18072 Residential Surface Treatment 82 11/6/2023 COACH::CBELLA::1 CALLE BELLA CALLE NINOS CDS 429 36 15444 Residential Asphalt 51 11/6/2023 COACH::CBERNARDO::1 CALLE BERNARDO CDS CALLE LEANDRO 559 34 19006 Residential Asphalt 65 11/6/2023 COACH::CBERNARDO::3 CALLE BERNARDO CALLE LEANDRO CDS 301 34 10234 Residential Asphalt 64 11/6/2023 COACH::CBONITA::1 CALLE BONITA CALLE NINOS CALLE FELIZ 312 36 11232 Residential Asphalt 47 11/6/2023 COACH::CBONITA::2 CALLE BONITA CALLE FELIZ CALLE ROSA 632 36 22752 Residential Asphalt 61 11/6/2023 COACH::CBONITA::3 CALLE BONITA CALLE ROSA 53RD AVE 179 36 6444 Residential Asphalt 56 11/6/2023 COACH::CBOUGANVIL::1 CALLE BOUGANVILIA TYLER ST CALLE CLAVEL 541 36 19476 Residential Asphalt 63 11/6/2023 COACH::CBOUGANVIL::2 CALLE BOUGANVILIA CALLE CLAVEL EL SOL ST 179 36 6444 Residential Asphalt 71 11/6/2023 COACH::CBOUGANVIL::3 CALLE BOUGANVILIA EL SOL ST CALLE GARDENIA 452 36 16272 Residential Asphalt 75 11/6/2023 COACH::CCAMACHO::1 CALLE CAMACHO D/E 53RD AVE 660 40 26400 Residential Asphalt 84 11/6/2023 COACH::CCAMACHO::2 CALLE CAMACHO 53RD AVE CALLE ZAMORA 661 40 26440 Residential Asphalt 82 11/6/2023 COACH::CCAMACHO::3 CALLE CAMACHO CALLE ZAMORA CALLE VERDE 661 40 26440 Residential Asphalt 80 11/6/2023 COACH::CCAMACHO::4 CALLE CAMACHO CALLE VERDE CALLE ROJO 648 40 25920 Residential Asphalt 78 11/6/2023 COACH::CCAMACHO::5 CALLE CAMACHO CALLE ROJO 52ND AVE 607 40 24280 Residential Asphalt 61 11/6/2023 COACH::CCAMACHO::6 CALLE CAMACHO 52ND AVE CAIRO AVE 337 40 13480 Residential Asphalt 62 11/6/2023 COACH::CCAMACHO::7 CALLE CAMACHO CAIRO AVE BAGDAD AVE 667 40 26680 Residential Asphalt 72 11/6/2023 COACH::CCANTARA::1 CALLE CANTARA AVENIDA FLORABUNDA AVENIDA NERIUM 859 36 30924 Residential Asphalt 63 11/6/2023 COACH::CCARMELLO::1 CALLE CARMELLO AVENIDA FLORABUNDA AVENIDA EUROPA 286 36 10296 Residential Asphalt 68 11/6/2023 COACH::CCARMELLO::2 CALLE CARMELLO AVENIDA EUROPA AVENIDA CEDRUS 286 36 10296 Residential Asphalt 56 11/6/2023 COACH::CCARMELLO::3 CALLE CARMELLO AVENIDA CEDRUS AVENIDA NERIUM 286 36 10296 Residential Asphalt 45 11/6/2023 COACH::CCARRASCO::1 CALLE CARRASCO CALLE LARRIVA CALLE CHAVEZ 282 36 10152 Residential Asphalt 100 11/6/2023 COACH::CCARRASCO::2 CALLE CARRASCO CALLE CHAVEZ CALLE YSIANO 266 36 9576 Residential Asphalt 89 11/6/2023 COACH::CCARRASCO::3 CALLE CARRASCO CALLE YSIANO CALLE RODRIGUEZ 276 36 9936 Residential Asphalt 100 11/6/2023 COACH::CCATHRON::1 CALLE CATHRON AVENIDA RAZON AVENIDA ADOBE 918 40 36720 Residential Asphalt 57 11/6/2023 COACH::CCEBRINO::1 CALLE CEBRINO CALLE CHAVEZ CDS 686 36 24696 Residential Asphalt 93 11/6/2023 COACH::CCERVANTES::1 CALLE CERVANTES 51ST AVE CALLE LARRIVA 214 20 4275 Residential Asphalt 100 11/6/2023 COACH::CCERVANTES::2 CALLE CERVANTES CALLE LARRIVA CALLE CHAVEZ 272 36 9792 Residential Asphalt 74 11/6/2023 COACH::CCERVANTES::3 CALLE CERVANTES CALLE CHAVEZ CALLE YSIANO 284 36 10224 Residential Asphalt 97 11/6/2023 COACH::CCERVANTES::4 CALLE CERVANTES CALLE YSIANO CALLE RODRIGUEZ 412 36 14832 Residential Asphalt 99 11/6/2023 COACH::CCERVANTES::5 CALLE CERVANTES 51ST AVE CALLE LARRIVA 214 20 4283 Residential Asphalt 100 11/6/2023 COACH::CCHAVEZ::1 CALLE CHAVEZ CALLE CARRASCO CALLE CERVANTES 378 36 13608 Residential Asphalt 100 11/6/2023 COACH::CCHAVEZ::2 CALLE CHAVEZ CALLE CERVANTES CALLE CEBRINO 339 36 12204 Residential Asphalt 100 11/6/2023 COACH::CCLAVEL::1 CALLE CLAVEL CALLE GERANIO CALLE VIOLETA 256 33 8448 Residential Asphalt 73 11/6/2023 COACH::CCLAVEL::2 CALLE CLAVEL CALLE VIOLETA CALLE BOUGANVILIA 255 33 8415 Residential Asphalt 79 11/6/2023 COACH::CCOLIMA::1 CALLE COLIMA AGUA CALIENTE ST LUNA DE NICOLETA ST 290 36 10440 Residential Asphalt 74 11/6/2023 COACH::CCOLIMA::2 CALLE COLIMA LUNA DE NICOLETA ST CAMINO MAYA 280 36 10080 Residential Asphalt 74 11/6/2023 COACH::CCOLIMA::3 CALLE COLIMA CAMINO MAYA CAMINO REAL 280 36 10080 Residential Asphalt 76 11/6/2023 COACH::CCOLIMA::4 CALLE COLIMA CAMINO REAL LA PLAYA ST 280 36 10080 Residential Asphalt 74 11/6/2023 COACH::CDANIELLE::1 CALLE DANIELLE AVENIDA MARIA AVENIDA CRYSTAL 324 30 9720 Residential Asphalt 70 11/6/2023 COACH::CDEVEGA::1 CALLE DE VEGA PASEO LAREDO CALLE LEON 332 40 13280 Residential Asphalt 100 11/6/2023 COACH::CDIEGO::1 CALLE DIEGO VIA SANTIAGO CALLE GREGORIO 582 34 19788 Residential Asphalt 70 11/6/2023 COACH::CDIEGO::2 CALLE DIEGO VIA SANTIAGO CALLE LEANDRO 696 34 23664 Residential Asphalt 83 11/6/2023 COACH::CDIEGO::3 CALLE DIEGO CALLE LEANDRO 150' E/O CALLE LEANDRO 153 34 5202 Residential Asphalt 54 11/6/2023 COACH::CDIEGO::4 CALLE DIEGO 150' E/O CALLE LEANDRO CDS 92 34 3128 Residential Asphalt 77 11/6/2023 COACH::CELSOL::1 CALLE EL SOL AVENIDA VERANO CORTE EL ALBA 280 37 10360 Residential Asphalt 50 11/6/2023 COACH::CELSOL::2 CALLE EL SOL CORTE EL ALBA CORTE LA MORADA 280 37 10360 Residential Asphalt 68 11/6/2023 COACH::CELSOL::3 CALLE EL SOL CORTE LA MORADA CORTE SOLEADO 280 37 10360 Residential Asphalt 59 11/6/2023 COACH::CELSOL::4 CALLE EL SOL CORTE SOLEADO AVENIDA LA LUNA 280 37 10360 Residential Asphalt 61 11/6/2023 COACH::CELDARICA::1 CALLE ELDARICA AVENIDA FLORABUNDA AVENIDA NERIUM 859 36 30924 Residential Asphalt 68 11/6/2023 COACH::CEMELIA::1 CALLE EMELIA AVENUE 53 AVENIDA RAYLYNN 197 36 7092 Residential Asphalt 56 11/6/2023 COACH::CEMELIA::2 CALLE EMELIA AVENIDA RAYLYNN AVENIDA GRACE 258 36 9288 Residential Asphalt 37 11/6/2023 COACH::CEMELIA::3 CALLE EMELIA AVENIDA GRACE AVENIDA ALEENAH 291 36 10476 Residential Asphalt 48 11/6/2023 COACH::CEMPALME::1 CALLE EMPALME BELLISSIMA AVE 53RD AVE 936 20 18720 Residential Asphalt 90 11/6/2023 COACH::CEMPALME::2 CALLE EMPALME 53RD AVE CALLE ZAMORA 661 36 23796 Residential Asphalt 79 11/6/2023 COACH::CEMPALME::3 CALLE EMPALME CALLE VERDE CALLE ROJO 648 40 25920 Residential Asphalt 77 11/6/2023 COACH::CEMPALME::4 CALLE EMPALME CALLE ROJO 52ND AVE 607 40 24280 Residential Asphalt 58 11/6/2023 COACH::CEMPALME::5 CALLE EMPALME 52ND AVE CAIRO AVE 677 44 29788 Residential Asphalt 53 11/6/2023 COACH::CESTRELLA::1 CALLE ESTRELLA CDS CALLE ROSA 242 36 8712 Residential Asphalt 72 11/6/2023 COACH::CFELIZ::1 CALLE FELIZ CALLE LOS HERMANOS CALLE BONITA 261 36 9396 Residential Asphalt 73 11/6/2023 COACH::CFLORENA::1 CALLE FLORENA AVENIDA RAYLYNN AVENIDA GRACE 282 36 10152 Residential Asphalt 61 11/6/2023 COACH::CFLORENA::2 CALLE FLORENA AVENIDA ALEENAH 110' N/O AVENIDA ALEENAH 109 36 3924 Residential Asphalt 66 11/6/2023 COACH::CFLORENA::3 CALLE FLORENA AVENIDA GRACE AVENIDA ALEENAH 280 36 10080 Residential Asphalt 75 11/6/2023 COACH::CFLORENA::4 CALLE FLORENA 110' N/O AVENIDA ALEENAH AVENIDA VERONICA 394 36 14184 Residential Asphalt 46 11/6/2023 COACH::CFRONTERA::1 CALLE FRONTERA AVENIDA SAN DOMINGO AVENIDA CAMPANAS 1010 36 36360 Residential Asphalt 98 11/6/2023 COACH::CGARDENIA::1 CALLE GARDENIA CALLE GERANIO CALLE VIOLETA 257 33 8481 Residential Asphalt 76 11/6/2023 COACH::CGARDENIA::2 CALLE GARDENIA CALLE VIOLETA CALLE BOUGANVILIA 256 33 8448 Residential Asphalt 74 11/6/2023 COACH::CGERANIO::1 CALLE GERANIO CALLE CLAVEL CALLE GARDENIA 633 33 20889 Residential Asphalt 73 11/6/2023 COACH::CGLORIOSA::1 CALLE GLORIOSA AVENIDA NERIUM D/E 153 36 5508 Residential Asphalt 77 11/6/2023 COACH::CGRANADA::1 CALLE GRANADA PASEO MADRID PASEO CORDOVA 300 36 10800 Residential Surface Treatment 97 11/6/2023 COACH::CGREGORIO::1 CALLE GREGORIO FREDERICK ST CALLE DIEGO 182 38 6916 Residential Asphalt 60 11/6/2023 COACH::CGREGORIO::2 CALLE GREGORIO CALLE DIEGO CALLE LEANDRO 666 38 25308 Residential Asphalt 56 11/6/2023 COACH::CJOYCE::1 CALLE JOYCE AVENIDA RAYLYNN AVENIDA GRACE 295 36 10620 Residential Asphalt 68 11/6/2023 COACH::CLAPAZ::1 CALLE LA PAZ CALLE NINOS CALLE ROSA 946 36 34056 Residential Asphalt 61 11/6/2023 COACH::CLAPAZ::2 CALLE LA PAZ CALLE ROSA 53RD AVE 179 36 6444 Residential Asphalt 50 11/6/2023 COACH::CLARRIVA::1 CALLE LARRIVA CALLE CARRASCO CALLE CERVANTES 374 36 13464 Residential Asphalt 100 11/6/2023 COACH::CLARRIVA::2 CALLE LARRIVA CALLE CERVANTES CDS 293 36 10548 Residential Asphalt 100 11/6/2023 COACH::CLEANDRO::1 CALLE LEANDRO 53RD AVE CALLE DIEGO 211 40 8440 Residential Asphalt 55 11/6/2023 COACH::CLEANDRO::2 CALLE LEANDRO CALLE DIEGO CALLE BERNARDO 282 40 11280 Residential Asphalt 56 11/6/2023 COACH::CLEANDRO::3 CALLE LEANDRO CALLE BERNARDO CALLE GREGORIO 389 40 15560 Residential Asphalt 70 11/6/2023 COACH::CLEANDRO::4 CALLE LEANDRO CALLE GREGORIO CDS 339 40 13560 Residential Asphalt 62 11/6/2023 COACH::CLEON::1 CALLE LEON CALLE DE VEGA AVENIDA CORTEZ 382 40 15280 Residential Asphalt 85 11/6/2023 COACH::CLIMON::1 CALLE LIMON GENOA ST CAMINO CORTO 219 30 6570 Residential Asphalt 68 11/6/2023 COACH::CLIMON::2 CALLE LIMON 52ND AVE CAMINO CORTO 581 30 17430 Residential Asphalt 59 11/6/2023 COACH::CLINDA::1 CALLE LINDA CDS CALLE ROSA 242 30 7260 Residential Asphalt 74 11/6/2023 COACH::CLOSHERMAN::1 CALLE LOS HERMANOS CALLE FELIZ CALLE ROSA 626 36 22536 Residential Asphalt 68 11/6/2023 COACH::CLYA::1 CALLE LYA CALLE TECHA CDS 362 30 10860 Residential Asphalt 71 11/6/2023 COACH::CMARBELLA::1 CALLE MARBELLA CALLE SEGOVIA VIA VALENCIA 338 33 11154 Residential Surface Treatment 93 11/6/2023 COACH::CMENDOZA::1 CALLE MENDOZA TYLER ST CORTE OLIVIA 635 33 20955 Residential Asphalt 67 11/6/2023 COACH::CMENDOZA::2 CALLE MENDOZA CORTE OLIVIA CALLE PIZANO 560 33 18480 Residential Asphalt 72 11/6/2023 COACH::CMENDOZA::3 CALLE MENDOZA LAS FLORES AVE CALLE PIZANO 463 33 15279 Residential Asphalt 66 11/6/2023 COACH::CNINOS::1 CALLE NINOS CALLE BONITA 50' W/O CALLE BONITA 43 36 1548 Residential Asphalt 72 11/6/2023 COACH::CNINOS::2 CALLE NINOS 50' W/O CALLE BONITA CALLE BELLA 235 36 8460 Residential Asphalt 66 11/6/2023 COACH::CNINOS::3 CALLE NINOS CALLE BELLA 140' W/O CALLE BELLA 143 36 5148 Residential Asphalt 66 11/6/2023 COACH::CNINOS::4 CALLE NINOS 140' W/O CALLE BELLA CALLE AMIGOS 143 36 5148 Residential Asphalt 60 11/6/2023 COACH::CNINOS::5 CALLE NINOS CALLE AMIGOS CALLE LA PAZ 277 36 9972 Residential Asphalt 61 11/6/2023 COACH::CNOGAL::1 CALLE NOGAL CALLE OLIVO CALLE AVILA 465 36 16740 Residential Asphalt 85 11/6/2023 COACH::COCASO::1 CALLE OCASO AVENIDA VERANO CORTE ECLIPSE 280 37 10360 Residential Asphalt 79 11/6/2023 COACH::COCASO::2 CALLE OCASO CORTE ECLIPSE CORTE ESTIVO 280 37 10360 Residential Asphalt 74 11/6/2023 COACH::COCASO::3 CALLE OCASO CORTE ESTIVO CORTE SOLIS 280 37 10360 Residential Asphalt 61 11/6/2023 COACH::COCASO::4 CALLE OCASO CORTE SOLIS AVENIDA LA LUNA 280 37 10360 Residential Asphalt 52 11/6/2023 COACH::COLIVO::1 CALLE OLIVO CALLE NOGAL CALLE PINO 348 30 10440 Residential Asphalt 92 11/6/2023 COACH::CPERA::1 CALLE PERA HILL DR CDS 209 32 6688 Residential Asphalt 65 11/6/2023 COACH::CPINO::1 CALLE PINO CALLE OLIVO CALLE AVILA 465 36 16740 Residential Asphalt 85 11/6/2023 COACH::CPIZANO::1 CALLE PIZANO TYLER ST COURTE STELLA 560 33 18480 Residential Asphalt 70 11/6/2023 COACH::CPIZANO::2 CALLE PIZANO COURTE STELLA CALLE MENDOZA 468 33 15444 Residential Asphalt 74 11/6/2023 A4
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::CPUERTADEL::1 CALLE PUERTA DEL SOL 50TH AVE AVENIDA VERANO 214 48 10272 Residential Asphalt 80 11/6/2023 COACH::CQUINTERRA::1 CALLE QUINTERRA 50TH AVE REDONDO SUR 212 37 7844 Residential Asphalt 48 11/6/2023 COACH::CQUINTERRA::2 CALLE QUINTERRA REDONDO SUR CORTE SANTOS 159 37 5883 Residential Asphalt 59 11/6/2023 COACH::CQUINTERRA::3 CALLE QUINTERRA CORTE SANTOS CORTE LORETO 370 37 13690 Residential Asphalt 32 11/6/2023 COACH::CQUINTERRA::4 CALLE QUINTERRA CORTE LORETO REDONDO NORTE 158 37 5846 Residential Asphalt 46 11/6/2023 COACH::CROBERTO::1 CALLE ROBERTO CALLE TECHA CDS 351 32 11232 Residential Asphalt 64 11/6/2023 COACH::CRODRIGUEZ::1 CALLE RODRIGUEZ CALLE CARRASCO CALLE CERVANTES 441 36 15876 Residential Asphalt 100 11/6/2023 COACH::CRODRIGUEZ::2 CALLE RODRIGUEZ CALLE CERVANTES CALLE CEBRINO 274 36 9864 Residential Asphalt 100 11/6/2023 COACH::CROJO::1 CALLE ROJO 260' W/O CALLE EMPALME D/E 660 40 26400 Residential Asphalt 38 11/6/2023 COACH::CROJO::2 CALLE ROJO 170 W/O CALLE EMPALME 260' W/O CALLE EMPALME 88 40 3520 Residential Asphalt 33 11/6/2023 COACH::CROJO::3 CALLE ROJO 85' W/O CALLE EMPALME 170' W/O CALLE EMPALME 88 40 3520 Residential Asphalt 38 11/6/2023 COACH::CROJO::4 CALLE ROJO 85' W/O CALLE EMPALME CALLE EMPALME 85 40 3400 Residential Asphalt 41 11/6/2023 COACH::CROJO::5 CALLE ROJO CALLE EMPALME CALLE TECHA 324 40 12960 Residential Asphalt 72 11/6/2023 COACH::CROJO::6 CALLE ROJO CALLE TECHA CALLE AVILA 324 40 12960 Residential Asphalt 70 11/6/2023 COACH::CROJO::7 CALLE ROJO CALLE AVILA CALLE CAMACHO 324 40 12960 Residential Asphalt 78 11/6/2023 COACH::CROJO::8 CALLE ROJO CALLE CAMACHO CESAR CHAVEZ ST 308 40 12320 Residential Asphalt 82 11/6/2023 COACH::CROJO::9 CALLE ROJO CESAR CHAVEZ ST SH-86 107 40 4280 Residential Asphalt 33 11/6/2023 COACH::CROSA::1 CALLE ROSA CALLE LOS HERMANOS CALLE BONITA 260 36 9360 Residential Asphalt 73 11/6/2023 COACH::CROSA::2 CALLE ROSA CALLE BONITA CALLE LINDA 287 36 10332 Residential Asphalt 73 11/6/2023 COACH::CROSA::3 CALLE ROSA CALLE LINDA 140' W/O CALLE ESTRELLA 143 36 5148 Residential Asphalt 78 11/6/2023 COACH::CROSA::4 CALLE ROSA 140' W/O CALLE ESTRELLA CALLE ESTRELLA 143 36 5148 Residential Asphalt 70 11/6/2023 COACH::CROSA::5 CALLE ROSA CALLE ESTRELLA CALLE LA PAZ 303 36 10908 Residential Asphalt 70 11/6/2023 COACH::CRUIZ::1 CALLE RUIZ AVENIDA YUCATECO AVENIDA TACUBA 240 36 8640 Residential Surface Treatment 91 11/6/2023 COACH::CRUIZ::2 CALLE RUIZ AVENIDA TACUBA AVENIDA ZOCALO 179 36 6444 Residential Surface Treatment 87 11/6/2023 COACH::CRUIZ::3 CALLE RUIZ AVENIDA ZOCALO AVENIDA REFORMA 179 36 6444 Residential Surface Treatment 98 11/6/2023 COACH::CRUIZ::4 CALLE RUIZ AVENIDA REFORMA AVENIDA DEL PRADO 240 36 8640 Residential Surface Treatment 99 11/6/2023 COACH::CRUIZ::5 CALLE RUIZ AVENIDA DEL PRADO AVENIDA EL FAROL 80 36 2880 Residential Surface Treatment 82 11/6/2023 COACH::CSANBORN::1 CALLE SANBORN AVENIDA DEL ROBLE AVENIDA ZOCALO 661 36 23796 Residential Surface Treatment 84 11/6/2023 COACH::CSANBORN::2 CALLE SANBORN AVENIDA ZOCALO AVENIDA EL FAROL 500 36 18000 Residential Surface Treatment 89 11/6/2023 COACH::CSEGOVIA::1 CALLE SEGOVIA PASEO BARCELONA CALLE MARBELLA 152 44 6688 Residential Surface Treatment 89 11/6/2023 COACH::CSEGOVIA::2 CALLE SEGOVIA CALLE MARBELLA PASEO CADIZ 148 44 6512 Residential Surface Treatment 86 11/6/2023 COACH::CSEVILLE::1 CALLE SEVILLE PASEO BARCELONA PASEO CADIZ 300 36 10800 Residential Surface Treatment 78 11/6/2023 COACH::CSOLEDAD::1 CALLE SOLEDAD VIA MISIONERO VIA TEPEYAC 868 36 31248 Residential Asphalt 76 11/6/2023 COACH::CSOLEDAD::2 CALLE SOLEDAD VIA TEPEYAC 53RD AVE 329 36 11844 Residential Asphalt 72 11/6/2023 COACH::CTECHA::1 CALLE TECHA 53RD AVE CALLE ZAMORA 661 40 26440 Residential Asphalt 81 11/6/2023 COACH::CTECHA::2 CALLE TECHA CALLE ZAMORA CALLE LYA 155 40 6200 Residential Asphalt 59 11/6/2023 COACH::CTECHA::3 CALLE TECHA CALLE LYA CALLE ROBERTO 251 40 10040 Residential Asphalt 70 11/6/2023 COACH::CTECHA::4 CALLE TECHA CALLE ROBERTO CALLE VERDE 256 40 10240 Residential Asphalt 73 11/6/2023 COACH::CTECHA::6 CALLE TECHA CALLE VERDE CALLE ROJO 648 40 25920 Residential Asphalt 75 11/6/2023 COACH::CTECHA::7 CALLE TECHA CALLE ROJO 52ND AVE 607 40 24280 Residential Asphalt 53 11/6/2023 COACH::CTECHA::8 CALLE TECHA 52ND AVE CAIRO AVE 678 40 27120 Residential Asphalt 50 11/6/2023 COACH::CTECOMARIA::1 CALLE TECOMARIA AVENIDA FLORABUNDA AVENIDA EUROPA 286 36 10296 Residential Asphalt 55 11/6/2023 COACH::CTECOMARIA::2 CALLE TECOMARIA AVENIDA EUROPA AVENIDA CEDRUS 286 36 10296 Residential Asphalt 42 11/6/2023 COACH::CTECOMARIA::3 CALLE TECOMARIA AVENIDA CEDRUS AVENIDA NERIUM 287 36 10332 Residential Asphalt 55 11/6/2023 COACH::CTOLOSA::1 CALLE TOLOSA SAN ASIS DR SANTO LN 385 37 14245 Residential Asphalt 66 11/6/2023 COACH::CTOLOSA::2 CALLE TOLOSA SANTO LN SAN REY DR 616 37 22792 Residential Asphalt 63 11/6/2023 COACH::CTORRESORD::1 CALLE TORRES ORDUNO 52ND AVE DOUMA CT 685 34 23290 Residential Asphalt 53 11/6/2023 COACH::CTORRESORD::2 CALLE TORRES ORDUNO DOUMA CT DAMASCUS AVE 336 34 11424 Residential Asphalt 50 11/6/2023 COACH::CVERDE::1 CALLE VERDE CALLE EMPALME CALLE TECHA 324 40 12960 Collector Asphalt 80 11/6/2023 COACH::CVERDE::2 CALLE VERDE CALLE TECHA CALLE AVILA 324 40 12960 Collector Asphalt 77 11/6/2023 COACH::CVERDE::3 CALLE VERDE CALLE AVILA CALLE CAMACHO 324 40 12960 Collector Asphalt 68 11/6/2023 COACH::CVERDE::4 CALLE VERDE CALLE CAMACHO CESAR CHAVEZ ST 302 40 12080 Collector Asphalt 61 11/6/2023 COACH::CVERDE::5 CALLE VERDE CESAR CHAVEZ ST SH-86 85 40 3400 Collector Asphalt 67 11/6/2023 COACH::CVIOLETA::1 CALLE VIOLETA CALLE CLAVEL CALLE GARDENIA 632 33 20856 Residential Asphalt 78 11/6/2023 COACH::CXAVIER::1 CALLE XAVIER AVENIDA SAN DOMINGO AVENIDA CAMPANAS 1006 36 36216 Residential Asphalt 99 11/6/2023 COACH::CYSIANO::1 CALLE YSIANO CALLE CARRASCO CALLE CERVANTES 439 36 15804 Residential Asphalt 100 11/6/2023 COACH::CZAMORA::1 CALLE ZAMORA CALLE EMPALME CALLE TECHA 371 36 13356 Residential Asphalt 75 11/6/2023 COACH::CZAMORA::2 CALLE ZAMORA CALLE TECHA CALLE AVILA 370 36 13320 Residential Asphalt 72 11/6/2023 COACH::CZAMORA::3 CALLE ZAMORA CALLE AVILA CALLE CAMACHO 270 36 9720 Residential Asphalt 69 11/6/2023 COACH::CZAMORA::4 CALLE ZAMORA CALLE CAMACHO CESAR CHAVEZ ST 256 36 9216 Residential Asphalt 55 11/6/2023 COACH::CZAMORA::5 CALLE ZAMORA CESAR CHAVEZ ST SH-86 107 36 3852 Residential Asphalt 68 11/6/2023 COACH::CBAHIAAVE::1 CAMINO BAHIA AVE PLAYA DEL AMOR ST CAMINO ROSARITO 680 36 24480 Residential Asphalt 74 11/6/2023 COACH::CBONITOAVE::1 CAMINO BONITO AVE ESTRELLA TOMAS ST ESTRELLA PEDRO ST 280 36 10080 Residential Asphalt 72 11/6/2023 COACH::CCONVENTO::1 CAMINO CONVENTO CDS AVENIDA CAMPANAS 434 36 15624 Residential Asphalt 100 11/6/2023 COACH::CCORAS::1 CAMINO CORAS AVENIDA SAN DOMINGO CDS 436 36 15696 Residential Asphalt 98 11/6/2023 COACH::CCORTEZ::1 CAMINO CORTEZ PUERTO ESCONDIDO AVE LOS CABOS AVE 280 36 10080 Residential Asphalt 52 11/6/2023 COACH::CCORTEZ::2 CAMINO CORTEZ LOS CABOS AVE TODOS SANTOS AVE 280 36 10080 Residential Asphalt 49 11/6/2023 COACH::CCORTO::1 CAMINO CORTO CALLE LIMON CDS 175 30 5250 Residential Asphalt 59 11/6/2023 COACH::CELFARO::1 CAMINO EL FARO AVENIDA SAN DOMINGO CDS 434 36 15624 Residential Asphalt 98 11/6/2023 COACH::CLASBRISAS::1 CAMINO LAS BRISAS EL CASTILLO RD AGLIA CALIENTE ST 766 36 27576 Residential Asphalt 76 11/6/2023 COACH::CAMLORETO::1 CAMINO LORETO AVENIDA SAN DOMINGO CDS 433 36 15588 Residential Asphalt 100 11/6/2023 COACH::CMAGDALENA::1 CAMINO MAGDALENA CDS AVENIDA CAMPANAS 434 36 15624 Residential Asphalt 98 11/6/2023 COACH::CMAYA::1 CAMINO MAYA AGUA BLANCA AVE CALLE COLIMA 726 36 26136 Residential Asphalt 73 11/6/2023 COACH::CPELICANO::1 CAMINO PELICANO CAMINO REAL LA PLAYA ST 280 36 10080 Residential Asphalt 71 11/6/2023 COACH::CREAL::1 CAMINO REAL AGUA BLANCA AVE CAMINO PELICANO 280 36 10080 Residential Asphalt 72 11/6/2023 COACH::CREAL::2 CAMINO REAL CAMINO PELICANO CALLE COLIMA 446 36 16056 Residential Asphalt 81 11/6/2023 COACH::CROSARIO::1 CAMINO ROSARIO CDS AVENIDA CAMPANAS 434 36 15624 Residential Asphalt 100 11/6/2023 COACH::CROSARITO::1 CAMINO ROSARITO D/E CAMINO BAHIA AVE 161 40 6440 Residential Asphalt 78 11/6/2023 COACH::CROSARITO::2 CAMINO ROSARITO CAMINO BAHIA AVE LOS CABOS AVE 280 40 11200 Residential Asphalt 77 11/6/2023 COACH::CAMPCT::1 CAMP CT CDS VISTA DEL SUR 892 44 39248 Collector Asphalt 59 11/6/2023 COACH::CAPITOLAAV::1 CAPITOLA AVE CDS MONARCH RD 361 36 12996 Residential Asphalt 70 11/6/2023 COACH::CAPITOLAAV::2 CAPITOLA AVE MONARCH RD LAGUNA LN 281 36 10116 Residential Asphalt 66 11/6/2023 COACH::CAPITOLAAV::3 CAPITOLA AVE LAGUNA LN VENENTA BLVD 330 36 11880 Residential Asphalt 30 11/6/2023 COACH::CAPITOLAAV::4 CAPITOLA AVE VENENTA BLVD NEWPORT ST 252 36 9072 Residential Asphalt 32 11/6/2023 COACH::CAPITOLAAV::5 CAPITOLA AVE NEWPORT ST OCEANO RD 373 36 13428 Residential Asphalt 45 11/6/2023 COACH::CARDELINAD::1 CARDELINA DR PALMERAS CIR PALMERAS CIR 458 36 16488 Residential Asphalt 47 11/6/2023 COACH::CARDINALDR::1 CARDINAL DR TYLER ST PALMERAS CIR 145 48 6960 Residential Asphalt 56 11/6/2023 COACH::CATALINAAV::1 CATALINA AVE NEWPORT ST OCEANO RD 373 36 13428 Residential Asphalt 46 11/6/2023 COACH::CATARINACT::1 CATARINA CT AVENIDA NICOLE CDS 260 36 9360 Residential Asphalt 63 11/6/2023 COACH::CESARCHAVE::1 CESAR CHAVEZ ST 53RD AVE CALLE ZAMORA 661 37 24457 Residential Asphalt 75 11/6/2023 COACH::CESARCHAVE::2 CESAR CHAVEZ ST CALLE VERDE CALLE ROJO 648 37 23976 Collector Asphalt 74 11/6/2023 COACH::CESARCHAVE::3 CESAR CHAVEZ ST CALLE ROJO 52ND AVE 607 37 22459 Collector Asphalt 13 11/6/2023 COACH::CHANNINGCT::1 CHANNING CT AVENIDA MARIA CDS 270 36 9720 Residential Asphalt 73 11/6/2023 COACH::CHAPARROSA::1 CHAPARROSA ST SAN MATEO AVE MECCA HILLS AVE 270 36 9720 Residential Asphalt 56 11/6/2023 COACH::CHAPARROSA::2 CHAPARROSA ST MECCA HILLS AVE GLENDORA RIDGE AVE 268 36 9648 Residential Asphalt 58 11/6/2023 COACH::CHAPARROSA::3 CHAPARROSA ST GLENDORA RIDGE AVE GRANITE PASS TRL 262 36 9432 Residential Asphalt 56 11/6/2023 COACH::CHAPARROSA::4 CHAPARROSA ST GRANITE PASS TRL COXCOMB DR 260 36 9360 Residential Asphalt 57 11/6/2023 COACH::CHAPARROSA::5 CHAPARROSA ST COXCOMB DR EAGLE AVE 311 36 11196 Residential Asphalt 64 11/6/2023 COACH::CHAPARROSA::6 CHAPARROSA ST EAGLE AVE MCCOY PEAK AVE 270 36 9720 Residential Asphalt 68 11/6/2023 COACH::CHAPARROSA::7 CHAPARROSA ST MCCOY PEAK AVE 48TH AVE 825 36 29700 Residential Asphalt 65 11/6/2023 COACH::CHARDONNAY::1 CHARDONNAY CIR MALVASIA WAY CDS 180 32 5760 Residential Asphalt 52 11/6/2023 COACH::CHARLTONPK::1 CHARLTON PEAK ST SAN MATEO AVE MECCA HILLS AVE 260 36 9360 Residential Asphalt 64 11/6/2023 COACH::CHARLTONPK::2 CHARLTON PEAK ST MECCA HILLS AVE BIG BEAR PL 895 36 32220 Residential Asphalt 64 11/6/2023 COACH::CHIAPASDR::1 CHIAPAS DR 51ST AVE 500' N/O 51ST AVE 506 28 14168 Residential Asphalt 55 11/6/2023 COACH::CHIAPASDR::2 CHIAPAS DR 500' N/O 51ST AVE TABASCO CT 264 28 7392 Residential Asphalt 67 11/6/2023 COACH::CHIAPASDR::3 CHIAPAS DR TABASCO CT 500' E/O TABASCO CT 499 28 13972 Residential Asphalt 64 11/6/2023 COACH::CHIAPASDR::4 CHIAPAS DR 500' E/O TABASCO CT BAJA WAY 369 28 10332 Residential Asphalt 69 11/6/2023 COACH::CHIAPASDR::5 CHIAPAS DR 315' E/O BAJA WAY BAJA WAY 316 28 8848 Residential Asphalt 60 11/6/2023 COACH::CHIAPASDR::6 CHIAPAS DR 220' S/O SALTILLO CT 315' E/O BAJA WAY 288 28 8064 Residential Asphalt 49 11/6/2023 COACH::CHIAPASDR::7 CHIAPAS DR 220' S/O SALTILLO CT SALTILLO CIR 221 28 6188 Residential Asphalt 69 11/6/2023 COACH::CHICHENITZ::1 CHICHEN ITZA RD PUERTO ESCONDIDO AVE IXTAPA AVE 280 36 10080 Residential Asphalt 73 11/6/2023 COACH::CHICHENITZ::2 CHICHEN ITZA RD IXTAPA AVE SAN IGNACIO AVE 249 36 8964 Residential Asphalt 53 11/6/2023 COACH::CHICHENITZ::4 CHICHEN ITZA RD SAN IGNACIO AVE AGUA BLANCA AVE 311 36 11196 Residential Asphalt 87 11/6/2023 COACH::CHIHUAHUA::1 CHIHUAHUA CT CDS MAZATLAN DR 236 28 6608 Residential Asphalt 61 11/6/2023 COACH::CHIRIACOSU::1 CHIRIACO SUMMIT ST GLENDORA RIDGE AVE BIG BEAR PL 618 36 22248 Residential Asphalt 68 11/6/2023 COACH::CHRISTINA::1 CHRISTINA RD FREDERICK ST ANDREA LN 180 36 6480 Residential Asphalt 90 11/6/2023 COACH::CHRISTINA::3 CHRISTINA RD ANDREA LN TOMAS LN 254 36 9144 Residential Asphalt 84 11/6/2023 COACH::CHRISTINA::4 CHRISTINA RD TOMAS LN RIGO CT 253 36 9108 Residential Asphalt 77 11/6/2023 COACH::CHRISTINA::5 CHRISTINA RD RIGO CT MARY CT 256 36 9216 Residential Asphalt 52 11/6/2023 COACH::CHRISTINA::6 CHRISTINA RD MARY CT AVENIDA ADOBE 258 36 9288 Residential Asphalt 63 11/6/2023 COACH::CHUPAROSA::1 CHUPAROSA DR PALMERAS CIR PALMERAS CIR 458 36 16488 Residential Asphalt 40 11/6/2023 COACH::CIELOVICTR::1 CIELO VICTORIA ST MARIANA AVE 48TH AVE 200 46 9200 Residential Asphalt 73 11/6/2023 COACH::CINNABARLN::1 CINNABAR LN JADEROCK RD NICKLECREEK DR 280 37 10360 Residential Asphalt 44 11/6/2023 COACH::CINNABARLN::2 CINNABAR LN NICKLECREEK DR SHADOWROCK DR 280 37 10360 Residential Asphalt 51 11/6/2023 COACH::CINNABARLN::3 CINNABAR LN SHADOWROCK DR LAPIS DR 280 37 10360 Residential Asphalt 54 11/6/2023 COACH::CINNABARLN::4 CINNABAR LN LAPIS DR SERPENTINE WAY 275 37 10175 Residential Asphalt 51 11/6/2023 COACH::COLONIADR::1 COLONIA DR SAN REY DR 50TH AVE 213 48 10224 Residential Brick N/A COACH::COPPERIDGE::1 COPPERIDGE ST JADEROCK RD NICKLECREEK DR 280 37 10360 Residential Asphalt 60 11/6/2023 COACH::COPPERIDGE::2 COPPERIDGE ST NICKLECREEK DR SHADOWROCK DR 280 37 10360 Residential Asphalt 33 11/6/2023 COACH::COPPERIDGE::3 COPPERIDGE ST SHADOWROCK DR LAPIS DR 280 37 10360 Residential Asphalt 31 11/6/2023 COACH::COPPERIDGE::4 COPPERIDGE ST LAPIS DR ASHLER CT 275 37 10175 Residential Asphalt 52 11/6/2023 COACH::CORONADOST::1 CORONADO ST D/E 50TH AVE 671 40 26840 Residential Asphalt 78 11/6/2023 COACH::CALTURIAN::1 CORTE ALTURIAN CDS AVENIDA ADOBE 654 40 26160 Residential Asphalt 60 11/6/2023 COACH::CBERNO::1 CORTE BERNARDO CDS AVENIDA ADOBE 360 40 14400 Residential Asphalt 65 11/6/2023 A5
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::CCINDARELA::1 CORTE CINDARELLA CDS AVENIDA ADOBE 334 40 13360 Residential Asphalt 87 11/6/2023 COACH::CDELPARQUE::1 CORTE DEL PARQUE CDS AVENIDA DEL PARQUE 162 28 4536 Residential Asphalt 99 11/6/2023 COACH::CECLIPSE::1 CORTE ECLIPSE CALLE OCASO CDS 382 37 14134 Residential Asphalt 75 11/6/2023 COACH::CELALBA::1 CORTE EL ALBA CDS CALLE EL SOL 416 37 15392 Residential Asphalt 80 11/6/2023 COACH::CESTIVO::1 CORTE ESTIVO CALLE OCASO CDS 382 37 14134 Residential Asphalt 71 11/6/2023 COACH::CGILLAN::1 CORTE GILLAN AVENIDA RAZON CDS 360 40 14400 Residential Asphalt 71 11/6/2023 COACH::CLAMIRADAE::1 CORTE LA MIRADA CALLE EL SOL VAN BUREN ST 218 37 8066 Residential Asphalt 72 11/6/2023 COACH::CLAMIRADAW::1 CORTE LA MIRADA VAN BUREN ST CALLE EL SOL 217 37 8029 Residential Asphalt 69 11/6/2023 COACH::CLAMORADA::1 CORTE LA MORADA CDS CALLE EL SOL 416 37 15392 Residential Asphalt 58 11/6/2023 COACH::CLORETO::1 CORTE LORETO CALLE QUINTERRA CDS 227 36 8172 Residential Asphalt 72 11/6/2023 COACH::CMOLINO::1 CORTE MOLINO CDS REDONDO NORTE 165 40 6600 Residential Asphalt 69 11/6/2023 COACH::COLIVIA::1 CORTE OLIVIA CDS CALLE MENDOZA 339 33 11187 Residential Asphalt 70 11/6/2023 COACH::CPERCEBE::1 CORTE PERCEBE REDONDO SUR CDS 164 36 5904 Residential Asphalt 61 11/6/2023 COACH::CSANTOS::1 CORTE SANTOS CDS CALLE QUINTERRA 243 36 8748 Residential Asphalt 67 11/6/2023 COACH::CSOLEADO::1 CORTE SOLEADO CDS CALLE EL SOL 415 37 15355 Residential Asphalt 60 11/6/2023 COACH::CSOLIS::1 CORTE SOLIS CALLE OCASO CDS 382 37 14134 Residential Asphalt 60 11/6/2023 COACH::CSTELLA::1 CORTE STELLA CALLE PIZANO CDS 121 33 3993 Residential Asphalt 65 11/6/2023 COACH::CYAGER::1 CORTE YAGER AVENIDA RAZON CDS 360 40 14400 Residential Asphalt 72 11/6/2023 COACH::CORTINAPL::1 CORTINA PLACE BELLISSIMA AVE SIENO LN 259 36 9324 Residential Asphalt 99 11/6/2023 COACH::CORTINAPL::2 CORTINA PLACE SIENO LN PALERMO CT 255 36 9180 Residential Asphalt 100 11/6/2023 COACH::CORTINAPL::3 CORTINA PLACE PALERMO CT MONZA LANE 233 36 8388 Residential Asphalt 100 11/6/2023 COACH::COXCOMBDR::1 COXCOMB DR CHAPARROSA ST RED MOUNTAIN PL 434 36 15624 Residential Asphalt 60 11/6/2023 COACH::COZUMELST::1 COZUMEL ST IXTAPA AVE TODOS SANTOS AVE 280 36 10080 Residential Asphalt 46 11/6/2023 COACH::CRESCENTW::1 CRESCENT WAY MOONLIT DR FIESTA RD 364 36 13104 Residential Asphalt 60 11/6/2023 COACH::CYPRESSST::1 CYPRESS ST VALENCIA LN VALLEY RD 294 38 11172 Residential Surface Treatment 62 11/6/2023 COACH::CYPRESSST::2 CYPRESS ST VALLEY RD 52ND AVE 1313 38 49894 Residential Surface Treatment 88 11/6/2023 COACH::DAMASCUSAV::1 DAMASCUS AVE DOUMA ST CALLE TORRES ORDUNO 514 38 19532 Residential Asphalt 58 11/6/2023 COACH::DAMASCUSAV::2 DAMASCUS AVE CALLE TORRES ORDUNO LIBNAN ST 150 38 5700 Residential Asphalt 74 11/6/2023 COACH::DAMASCUSAV::3 DAMASCUS AVE SH-86 ALLEY 192 38 7296 Residential Surface Treatment 88 11/6/2023 COACH::DAMASCUSAV::4 DAMASCUS AVE ALLEY TRIPOLI WAY 445 38 16910 Residential Surface Treatment 75 11/6/2023 COACH::DAMASCUSAV::5 DAMASCUS AVE TRIPOLI WAY DATE AVE 660 38 25080 Residential Surface Treatment 74 11/6/2023 COACH::DATEAVE::1 DATE AVE 52ND AVE ARABY AVE 280 36 10080 Residential Surface Treatment 68 11/6/2023 COACH::DATEAVE::10 DATE AVE 7TH ST 6TH ST 325 36 11700 Collector Asphalt 59 11/6/2023 COACH::DATEAVE::2 DATE AVE ARABY AVE ARABY AVE 56 36 2016 Residential Surface Treatment 58 11/6/2023 COACH::DATEAVE::3 DATE AVE ARABY AVE CAIRO AVE 214 36 7704 Residential Surface Treatment 63 11/6/2023 COACH::DATEAVE::4 DATE AVE CAIRO AVE CAIRO AVE 130 36 4680 Residential Surface Treatment 78 11/6/2023 COACH::DATEAVE::5 DATE AVE CAIRO AVE MEDINA AVE 140 36 5040 Residential Surface Treatment 75 11/6/2023 COACH::DATEAVE::6 DATE AVE MEDINA AVE DAMASCUS AVE 270 36 9720 Residential Surface Treatment 76 11/6/2023 COACH::DATEAVE::7 DATE AVE DAMASCUS AVE BAGDAD AVE 270 36 9720 Residential Surface Treatment 65 11/6/2023 COACH::DATEAVE::8 DATE AVE BAGDAD AVE 8TH ST 195 36 7020 Collector Asphalt 45 11/6/2023 COACH::DATEAVE::9 DATE AVE 8TH ST 7TH ST 376 36 13536 Collector Asphalt 55 11/6/2023 COACH::DIEGOCT::1 DIEGO CT CDS SHADY LN 434 36 15624 Residential Asphalt 82 11/6/2023 COACH::DILLONRD::1 DILLON RD CITY LIMITS HARRISON ST 209 96 20064 Arterial Asphalt 91 11/6/2023 COACH::DILLONRD::10 DILLON RD 800' S/O VISTA DEL NORTE 650' S/O VISTA DEL NORTE 148 96 14208 Arterial Asphalt 82 11/6/2023 COACH::DILLONRD::11 DILLON RD 650' S/O VISTA DEL NORTE 450' S/O VISTA DEL NORTE 194 96 18624 Arterial Asphalt 50 11/6/2023 COACH::DILLONRD::12 DILLON RD 450' S/O VISTA DEL NORTE VISTA DEL NORTE 453 96 43488 Arterial Asphalt 80 11/6/2023 COACH::DILLONRD::13 DILLON RD VISTA DEL NORTE DILLON RD 2921 96 280416 Arterial Asphalt 4 11/6/2023 COACH::DILLONRD::5 DILLON RD 3135' S/O VISTA DEL SUR VISTA DEL SUR 3136 96 301056 Arterial Asphalt 73 11/6/2023 COACH::DILLONRD::7 DILLON RD VISTA DEL SUR 1070' S/O VISTA DEL NORTE 232 96 22272 Arterial Asphalt 87 11/6/2023 COACH::DILLONRD::8 DILLON RD 1070' S/O VISTA DEL NORTE 800' S/O VISTA DEL NORTE 269 96 25824 Arterial Asphalt 91 11/6/2023 COACH::DILLONRDN::14 DILLON RD DILLON RD 44TH AVE 1526 33 50358 Arterial Asphalt 37 11/6/2023 COACH::DILLONRDS::1 DILLON RD 44TH AVE DILLON RD 1510 33 49830 Arterial Asphalt 24 11/6/2023 COACH::DOSPALMAS::1 DOS PALMAS AVE VALLEY RD 52ND AVE 1312 38 49856 Residential Surface Treatment 84 11/6/2023 COACH::DOUMACT::1 DOUMA CT 52ND AVE DOUMA CT 693 36 24948 Residential Asphalt 42 11/6/2023 COACH::DOUMACT::2 DOUMA CT DOUMA CT CALLE TORRES ORDUNO 185 36 6660 Residential Asphalt 28 11/6/2023 COACH::DOUMAST::1 DOUMA ST 52ND AVE DAMASCUS AVE 1025 38 38950 Residential Asphalt 65 11/6/2023 COACH::DOUMAST::2 DOUMA ST DAMASCUS AVE BAGDAD AVE 333 38 12654 Residential Asphalt 69 11/6/2023 COACH::ESIENNACIR::1 E SIENNA CIR SCARLET WAY INDIGO CT 291 36 10476 Residential Asphalt 82 11/6/2023 COACH::ESIENNACIR::2 E SIENNA CIR INDIGO CT N SIENNA CIR 264 36 9504 Residential Asphalt 62 11/6/2023 COACH::EAGLEAVE::1 EAGLE AVE CALHOUN ST SAN GORGONIO ST 188 38 7144 Residential Asphalt 54 11/6/2023 COACH::EAGLEAVE::2 EAGLE AVE SAN GORGONIO ST CHAPARROSA ST 435 38 16530 Residential Asphalt 69 11/6/2023 COACH::EAGLEAVE::3 EAGLE AVE CHAPARROSA ST PINTO LN 541 38 20558 Residential Asphalt 62 11/6/2023 COACH::EDMITCHELL::1 ED MITCHELL DR VAN BUREN ST MITCHELL DR 2880 26 74880 Collector Asphalt 55 11/6/2023 COACH::ELARCOST::1 EL ARCO ST LOS CABOS AVE TODOS SANTOS AVE 280 38 10640 Residential Asphalt 81 11/6/2023 COACH::ELARCOST::2 EL ARCO ST TODOS SANTOS AVE PUEBLO BONITO AVE 728 38 27664 Residential Asphalt 72 11/6/2023 COACH::ELCASTILLO::1 EL CASTILLO RD TODOS SANTOS AVE CAMINO LAS BRISAS 280 38 10640 Residential Asphalt 81 11/6/2023 COACH::ELCASTILLO::2 EL CASTILLO RD CAMINO LAS BRISAS PUEBLO BONITO AVE 448 38 17024 Residential Asphalt 81 11/6/2023 COACH::ELGRECOAVE::1 EL GRECO AVE PLAYA DEL AMOR ST TAXCO AVE 866 38 32908 Residential Asphalt 78 11/6/2023 COACH::ELMARAVE::1 EL MAR AVE LA PLAYA ST CALHOUN ST 194 44 8536 Residential Asphalt 63 11/6/2023 COACH::ELSOLST::1 EL SOL ST CALLE BOUGANVILIA LAS FLORES AVE 266 33 8778 Residential Asphalt 71 11/6/2023 COACH::ENTERPRISE::1 ENTERPRISE WAY D/E 54TH AVE 509 45 22905 Collector Asphalt 66 11/6/2023 COACH::ENTERPRISE::2 ENTERPRISE WAY 54TH AVE INDUSTRIAL WAY 4334 45 195030 Collector Asphalt 71 11/6/2023 COACH::ENTERPRISE::3 ENTERPRISE WAY INDUSTRIAL WAY 52ND AVE 1311 45 58995 Collector Asphalt 12 11/6/2023 COACH::ESTRELLAPE::1 ESTRELLA PEDRO ST CAMINO BONITO AVE LA COSTA AVE 350 36 12600 Residential Asphalt 61 11/6/2023 COACH::ESTRELLATO::1 ESTRELLA TOMAS ST CAMINO BONITO AVE MARIANA AVE 350 36 12600 Residential Asphalt 71 11/6/2023 COACH::FIESTARD::1 FIESTA RD CRESCENT WAY VALLE POSADA 957 36 34452 Residential Asphalt 57 11/6/2023 COACH::FIESTARD::2 FIESTA RD VALLE POSADA VAN BUREN ST 214 36 7704 Residential Asphalt 51 11/6/2023 COACH::FIESTARD::3 FIESTA RD VAN BUREN ST SUMMER ST 205 36 7380 Residential Asphalt 40 11/6/2023 COACH::FIESTARD::4 FIESTA RD SUMMER ST SIERRA ST 287 36 10332 Residential Asphalt 71 11/6/2023 COACH::FIESTARD::5 FIESTA RD SIERRA ST BRIANNE LN 691 36 24876 Residential Asphalt 74 11/6/2023 COACH::FILLMOREST::1 FILLMORE ST AIRPORT BLVD 55TH AVE 2660 24 63840 Rural Asphalt 53 11/6/2023 COACH::FILLMOREST::2 FILLMORE ST 55TH AVE 900' N/O 55TH AVE 900 24 21600 Rural Asphalt 33 11/6/2023 COACH::FILLMOREST::3 FILLMORE ST 1750' S/O 54TH AVE 54TH AVE 1739 24 41736 Rural Asphalt 3 11/6/2023 COACH::FILLMOREST::4 FILLMORE ST 54TH AVE CITY LIMIT 1320 24 31680 Rural Asphalt 81 11/6/2023 COACH::FILLMOREST::5 FILLMORE ST 52ND AVE 2650' N/O 52ND AVE 2649 24 63576 Rural Asphalt 8 11/6/2023 COACH::FILLMOREST::6 FILLMORE ST 2650' S/O 50TH AVE 50TH AVE 2630 24 63120 Rural Asphalt 17 11/6/2023 COACH::FREDERICK::1 FREDERICK ST 54TH AVE SCARLET WAY 632 36 22752 Collector Asphalt 73 11/6/2023 COACH::FREDERICK::11 FREDERICK ST BAJA WAY 520' N/O BAJA WAY 516 66 34056 Collector Asphalt 82 11/6/2023 COACH::FREDERICK::12 FREDERICK ST 660' S/O CHRISTINA RD JALISCO AVE 669 66 44154 Collector Asphalt 79 11/6/2023 COACH::FREDERICK::13 FREDERICK ST JALISCO AVE 50TH AVE 651 66 42966 Collector Asphalt 76 11/6/2023 COACH::FREDERICK::14 FREDERICK ST 50TH AVE AVENIDA VESTAGO 537 66 35442 Collector Asphalt 27 11/6/2023 COACH::FREDERICK::15 FREDERICK ST AVENIDA VESTAGO PASEO LAREDO 347 66 22902 Collector Asphalt 26 11/6/2023 COACH::FREDERICK::16 FREDERICK ST PASEO LAREDO PHOENIX AVE 467 66 30822 Collector Asphalt 23 11/6/2023 COACH::FREDERICK::17 FREDERICK ST PHOENIX AVE GUITRON ST 146 66 9636 Collector Asphalt 57 11/6/2023 COACH::FREDERICK::18 FREDERICK ST GUITRON ST IRIS AVE 276 66 18216 Collector Asphalt 52 11/6/2023 COACH::FREDERICK::19 FREDERICK ST IRIS AVE 150' N/O IRIS AVE 150 66 9900 Collector Asphalt 60 11/6/2023 COACH::FREDERICK::2 FREDERICK ST SCARLET WAY BELLISSIMA AVE 1079 36 38844 Collector Asphalt 50 11/6/2023 COACH::FREDERICK::20 FREDERICK ST 140' S/O LAS LUNAS AVE LAS LUNAS AVE 142 66 9372 Residential Asphalt 86 11/6/2023 COACH::FREDERICK::21 FREDERICK ST LAS LUNAS AVE 49TH AVE 647 66 42702 Collector Asphalt 71 11/6/2023 COACH::FREDERICK::3 FREDERICK ST BELLISSIMA AVE 53RD AVE 936 30 28080 Collector Asphalt 100 11/6/2023 COACH::FREDERICK::4 FREDERICK ST 53RD AVE CALLE GREGORIO 863 30 25890 Collector Asphalt 43 11/6/2023 COACH::FREDERICK::5 FREDERICK ST CALLE GREGORIO SOLARCE ST 926 30 27780 Collector Asphalt 47 11/6/2023 COACH::FREDERICK::6 FREDERICK ST SOLARCE ST 52ND AVE 778 66 51348 Collector Asphalt 63 11/6/2023 COACH::FREDERICK::7 FREDERICK ST 52ND AVE 1330' N/O 52ND AVE 1326 43 57018 Collector Asphalt 40 11/6/2023 COACH::FREDERICK::8 FREDERICK ST 1350' S/O 51ST AVE 51ST AVE 1350 43 58050 Collector Asphalt 40 11/6/2023 COACH::FREDERICK::9 FREDERICK ST 51ST AVE AVENIDA HALAWAY 804 66 53064 Collector Asphalt 82 11/6/2023 COACH::GARNETRIDG::1 GARNET RIDGE ST AVENUE 49 SAN MATEO AVE 210 36 7560 Residential Asphalt 69 11/6/2023 COACH::GENOAST::1 GENOA ST AVENUE 53 AVENIDA RAYLYNN 334 37 12358 Residential Asphalt 51 11/6/2023 COACH::GENOAST::10 GENOA ST CALLE LIMON VINETA LN 126 37 4662 Residential Asphalt 66 11/6/2023 COACH::GENOAST::11 GENOA ST VINETA LN SYLMAR LN 250 37 9250 Residential Asphalt 60 11/6/2023 COACH::GENOAST::12 GENOA ST SYLMAR LN NAPOLI LN 250 37 9250 Residential Asphalt 47 11/6/2023 COACH::GENOAST::13 GENOA ST NAPOLI LN BAGDAD ST 275 37 10175 Residential Asphalt 68 11/6/2023 COACH::GENOAST::2 GENOA ST AVENIDA RAYLYNN AVENIDA ALEENAH 560 37 20720 Residential Asphalt 45 11/6/2023 COACH::GENOAST::3 GENOA ST AVENIDA ALEENAH 150' N/O AVENIDA ALEENAH 143 37 5291 Residential Asphalt 24 11/6/2023 COACH::GENOAST::4 GENOA ST 380' S/O AVENIDA VERONICA AVENIDA VERONICA 382 37 14134 Residential Asphalt 33 11/6/2023 COACH::GENOAST::5 GENOA ST AVENIDA VERONICA 150' N/O AVENIDA VERONICA 148 37 5476 Residential Asphalt 30 11/6/2023 COACH::GENOAST::6 GENOA ST 200' S/O AVENIDA MARIA AVENIDA MARIA 204 37 7548 Residential Asphalt 70 11/6/2023 COACH::GENOAST::7 GENOA ST AVENIDA MARIA 52ND AVE 576 37 21312 Residential Asphalt 65 11/6/2023 COACH::GENOAST::8 GENOA ST 52ND AVE NILE LN 279 37 10323 Residential Asphalt 51 11/6/2023 COACH::GENOAST::9 GENOA ST NILE LN CALLE LIMON 124 37 4588 Residential Asphalt 56 11/6/2023 COACH::GLENDORARG::1 GLENDORA RIDGE AVE CHIRIACO SUMMIT ST CHAPARROSA ST 286 36 10296 Residential Asphalt 64 11/6/2023 COACH::GLENDORARG::2 GLENDORA RIDGE AVE CHAPARROSA ST CDS 425 36 15300 Residential Asphalt 69 11/6/2023 COACH::GRANITEPAS::1 GRANITE PASS TRL CHAPARROSA ST RED MOUNTAIN PL 429 36 15444 Residential Asphalt 63 11/6/2023 COACH::GRAPEFRUIT::1 GRAPEFRUIT BLVD CITY LIMITS 3310' S/O 54TH AVE 271 55 14905 Arterial Asphalt 79 11/6/2023 COACH::GRAPEFRUIT::2 GRAPEFRUIT BLVD 3310' S/O 54TH AVE 1660' S/O 54TH AVE 1646 55 90530 Arterial Asphalt 85 11/6/2023 COACH::GRAPEFRUIT::3 GRAPEFRUIT BLVD 1660' S/O 54TH AVE 54TH AVE 1657 55 91135 Arterial Asphalt 82 11/6/2023 COACH::GUADALUPAN::1 GUADALUPANA CT CDS SHADY LN 434 36 15624 Residential Asphalt 75 11/6/2023 COACH::GUITRONST::1 GUITRON ST FREDERICK ST REYES ST 181 34 6154 Residential Asphalt 33 11/6/2023 COACH::GUITRONST::2 GUITRON ST REYES ST NIETO ST 997 34 33898 Residential Asphalt 43 11/6/2023 COACH::GUITRONST::3 GUITRON ST NIETO ST AVENIDA DE ORO 145 34 4930 Residential Asphalt 60 11/6/2023 COACH::HARRISONST::1 HARRISON ST D/E 48TH AVE 3789 30 113670 Collector Asphalt 74 11/6/2023 COACH::HARRISONST::2 HARRISON ST CITY LIMITS CITY LIMITS 1322 96 126912 Residential Asphalt 72 11/6/2023 COACH::HEATHERLN::1 HEATHER LN OASIS PALM AVE SHADY LN 785 38 29830 Residential Surface Treatment 58 11/6/2023 COACH::HERMOSABL::1 HERMOSA BLVD HUNTINGTON AVE LA JOLLA AVE 256 36 9216 Residential Asphalt 79 11/6/2023 A6
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::HERNANDEZ::1 HERNANDEZ ST LA PONDEROSA DR PEREZ ST 398 40 15920 Residential Asphalt 97 11/6/2023 COACH::HERNANDEZ::2 HERNANDEZ ST PEREZ ST ORTIZ ST 483 40 19320 Residential Asphalt 96 11/6/2023 COACH::HERNANDEZ::3 HERNANDEZ ST 52ND AVE ORTIZ ST 1076 40 43040 Residential Asphalt 94 11/6/2023 COACH::HIBISCOST::1 HIBISCO ST PHOENIX AVE CALENDULA AVE 162 37 5994 Residential Asphalt 50 11/6/2023 COACH::HIBISCOST::2 HIBISCO ST CALENDULA AVE IRIS AVE 256 37 9472 Residential Asphalt 25 11/6/2023 COACH::HIBISCOST::3 HIBISCO ST IRIS AVE AMAPOLA LN 266 37 9842 Residential Asphalt 23 11/6/2023 COACH::HIBISCOST::4 HIBISCO ST AMAPOLA LN ROSAL AVE 251 37 9287 Residential Asphalt 37 11/6/2023 COACH::HIBISCOST::5 HIBISCO ST ROSAL AVE MARGARITA AVE 254 37 9398 Residential Asphalt 24 11/6/2023 COACH::HILLDR::1 HILL DR GENOA ST CALLE PERA 253 40 10120 Residential Asphalt 56 11/6/2023 COACH::HILLDR::2 HILL DR CALLE PERA SUNSET DR 204 40 8160 Residential Asphalt 58 11/6/2023 COACH::HILLDR::3 HILL DR SUNSET DR 240' W/O SH-111 141 40 5640 Residential Asphalt 19 11/6/2023 COACH::HILLDR::4 HILL DR 240' W/O SH-111 SH-111 236 40 9440 Residential Asphalt 58 11/6/2023 COACH::HORNBLEND::1 HORNBLEND ST 50TH AVE JADEROCK RD 228 37 8436 Residential Asphalt 89 11/6/2023 COACH::HUNTINGTON::1 HUNTINGTON AVE VENICE LN MONARCH RD 400 36 14400 Residential Asphalt 82 11/6/2023 COACH::HUNTINGTON::2 HUNTINGTON AVE MONARCH RD HERMOSA BLVD 250 36 9000 Residential Asphalt 74 11/6/2023 COACH::HUNTINGTON::3 HUNTINGTON AVE HERMOSA BLVD VENENTA BLVD 361 36 12996 Residential Asphalt 49 11/6/2023 COACH::HUXLEYCT::1 HUXLEY CT MICHELLE DR CDS 224 36 8064 Residential Asphalt 78 11/6/2023 COACH::INDIGOCT::1 INDIGO CT CDS E SIENNA CIR 304 36 10944 Residential Asphalt 81 11/6/2023 COACH::INDUSTRIAL::1 INDUSTRIAL WAY TYLER ST ENTERPRISE WAY 3581 45 161145 Collector Asphalt 50 11/6/2023 COACH::INDUSTRIAL::2 INDUSTRIAL WAY ENTERPRISE WAY POLK ST 1684 45 75780 Collector Asphalt 39 11/6/2023 COACH::IRISAVE::1 IRIS AVE HIBISCO ST FREDERICK ST 188 37 6956 Residential Asphalt 37 11/6/2023 COACH::IXTAPAAVE::1 IXTAPA AVE CDS COZUMEL ST 535 36 19260 Residential Asphalt 54 11/6/2023 COACH::IXTAPAAVE::2 IXTAPA AVE COZUMEL ST CHICHEN ITZA RD 280 36 10080 Residential Asphalt 46 11/6/2023 COACH::JACKSONST::1 JACKSON ST CITY LIMITS PUERTECITOS AVE 524 66 34584 Arterial Asphalt 70 11/6/2023 COACH::JACKSONST::2 JACKSON ST PUERTECITOS AVE LOS MOCHIS AVE 810 66 53460 Arterial Asphalt 75 11/6/2023 COACH::JACKSONST::3 JACKSON ST LOS MOCHIS AVE 48TH AVE 1298 66 85668 Arterial Asphalt 58 11/6/2023 COACH::JADEROCKRD::1 JADEROCK RD COPPERIDGE ST HORNBLEND ST 509 37 18833 Residential Asphalt 43 11/6/2023 COACH::JADEROCKRD::2 JADEROCK RD HORNBLEND ST CINNABAR LN 480 37 17760 Residential Asphalt 55 11/6/2023 COACH::JALISCOAVE::1 JALISCO AVE SALTILLO CIR JALISCO AVE 167 28 4676 Residential Asphalt 65 11/6/2023 COACH::JALISCOAVE::2 JALISCO AVE SALTILLO CIR JALISCO AVE 164 28 4592 Residential Asphalt 39 11/6/2023 COACH::JALISCOAVE::3 JALISCO AVE JALISCO AVE JALISCO ACE PARKING LOOP 206 28 5768 Residential Asphalt 62 11/6/2023 COACH::JALISCOAVE::4 JALISCO AVE JALISCO ACE PARKING LOOP 100' S/O TAXCO WAY 693 28 19404 Residential Asphalt 61 11/6/2023 COACH::JALISCOAVE::5 JALISCO AVE 100' S/O TAXCO WAY TAXCO WAY 108 28 3024 Residential Asphalt 52 11/6/2023 COACH::JALISCOAVE::6 JALISCO AVE TAXCO WAY FREDERICK ST 252 28 7056 Residential Asphalt 38 11/6/2023 COACH::JAZMINST::1 JAZMIN ST CALENDULA AVE MARGARITA AVE 1029 36 37044 Residential Asphalt 40 11/6/2023 COACH::JAZMINST::2 JAZMIN ST MARGARITA AVE 49TH AVE 177 37 6549 Residential Asphalt 25 11/6/2023 COACH::JENNIFER::1 JENNIFER WAY VALLEY RD 52ND AVE 1304 38 49552 Residential Surface Treatment 75 11/6/2023 COACH::JULIACT::1 JULIA CT AVENIDA ALEENAH CDS 230 36 8280 Residential Asphalt 75 11/6/2023 COACH::JULIADR::1 JULIA DR ANDREA LN AVENIDA ADOBE 1021 36 36756 Residential Asphalt 76 11/6/2023 COACH::KENMOREST::1 KENMORE ST D/E 50TH AVE 672 40 26880 Residential Asphalt 77 11/6/2023 COACH::KENTIACT::1 KENTIA CT CDS PHOENIX AVE 208 32 6656 Residential Asphalt 67 11/6/2023 COACH::KINGCT::1 KING CT CDS WASHINGTONIA AVE 313 32 10016 Residential Asphalt 81 11/6/2023 COACH::LACOSTAAVE::1 LA COSTA AVE ESTRELLA PEDRO ST LA PLAYA ST 280 34 9520 Residential Asphalt 76 11/6/2023 COACH::LAJOLLAAVE::1 LA JOLLA AVE CDS HERMOSA BLVD 355 36 12780 Residential Asphalt 77 11/6/2023 COACH::LAJOLLAAVE::2 LA JOLLA AVE HERMOSA BLVD ZUMA DR 326 36 11736 Residential Asphalt 74 11/6/2023 COACH::LAJOLLAAVE::3 LA JOLLA AVE ZUMA DR NEWPORT ST 287 36 10332 Residential Asphalt 51 11/6/2023 COACH::LAJOLLAAVE::4 LA JOLLA AVE NEWPORT ST CDS 99 36 3564 Residential Asphalt 49 11/6/2023 COACH::LAPLAYAST::1 LA PLAYA ST CAMINO PELICANO CALLE COLIMA 446 36 16056 Residential Asphalt 67 11/6/2023 COACH::LAPLAYAST::2 LA PLAYA ST CALLE COLIMA 140' N/O CALLE COLIMA 140 36 5040 Residential Asphalt 62 11/6/2023 COACH::LAPLAYAST::3 LA PLAYA ST 50' S/O EL MAR AVE EL MAR AVE 35 36 1260 Residential Asphalt 81 11/6/2023 COACH::LAPLAYAST::4 LA PLAYA ST EL MAR AVE LA COSTA AVE 455 36 16380 Residential Asphalt 79 11/6/2023 COACH::LAPONDEROS::1 LA PONDEROSA DR 52ND AVE NAOMI CT 339 36 12204 Residential Asphalt 83 11/6/2023 COACH::LAPONDEROS::2 LA PONDEROSA DR NAOMI CT HERNANDEZ ST 1167 36 42012 Residential Asphalt 92 11/6/2023 COACH::LAPONDEROS::3 LA PONDEROSA DR HERNANDEZ ST CDS 115 36 4140 Residential Asphalt 89 11/6/2023 COACH::LAGUNALN::1 LAGUNA LN CDS LAGUNA LN 643 36 23148 Residential Asphalt 73 11/6/2023 COACH::LAGUNALN::2 LAGUNA LN LAGUNA LN CAPITOLA AVE 259 36 9324 Residential Asphalt 58 11/6/2023 COACH::LAPISDR::1 LAPIS DR COPPERIDGE ST CINNABAR LN 989 37 36593 Residential Asphalt 46 11/6/2023 COACH::LASCRUCES::2 LAS CRUCES ST LA LUNAS AVE 49TH AVE 647 36 23292 Residential Asphalt 81 11/6/2023 COACH::LASFLORES::1 LAS FLORES AVE TYLER ST EL SOL ST 719 33 23727 Residential Asphalt 69 11/6/2023 COACH::LASFLORES::2 LAS FLORES AVE EL SOL ST CALLE MENDOZA 409 33 13497 Residential Asphalt 69 11/6/2023 COACH::LASFLORES::3 LAS FLORES AVE CALLE MENDOZA CDS 196 33 6468 Residential Asphalt 69 11/6/2023 COACH::LASLUNASAV::1 LAS LUNAS AVE FREDERICK ST SEDONA CT 199 36 7164 Residential Asphalt 74 11/6/2023 COACH::LASLUNASAV::2 LAS LUNAS AVE SEDONA CT MESA CT 316 36 11376 Residential Asphalt 77 11/6/2023 COACH::LASLUNASAV::3 LAS LUNAS AVE MESA CT RIO RANCHO CT 316 36 11376 Residential Asphalt 69 11/6/2023 COACH::LASLUNASAV::4 LAS LUNAS AVE RIO RANCHO CT LAS CRUCES ST 321 36 11556 Residential Asphalt 77 11/6/2023 COACH::LASPALMAS::1 LAS PALMAS ST VALLEY RD 52ND AVE 1309 38 49742 Residential Surface Treatment 77 11/6/2023 COACH::LASPLUMAS::1 LAS PLUMAS CT PLUMA AMARILLA PL CALHOUN ST 153 27 4137 Residential Surface Treatment 78 11/6/2023 COACH::LASPLUMAS::2 LAS PLUMAS CT PLUMA AMARILLA PL CALHOUN ST 153 27 4137 Residential Surface Treatment 78 11/6/2023 COACH::LEELN::1 LEE LN 53RD AVE CDS 604 40 24160 Residential Asphalt 55 11/6/2023 COACH::LIBNANST::1 LIBNAN ST DAMASCUS AVE BAGDAD AVE 333 14 4662 Residential Asphalt 100 11/6/2023 COACH::LINDAAVE::1 LINDA AVE ANDREA LN AVENIDA ADOBE 1021 36 36756 Residential Asphalt 79 11/6/2023 COACH::LIVISTONA::1 LIVISTONA CT CDS PHOENIX AVE 208 32 6656 Residential Asphalt 49 11/6/2023 COACH::LOOP::1 LOOP 4TH ST SH-86 541 30 16230 Collector Asphalt 100 11/6/2023 COACH::LOSCABOSAV::1 LOS CABOS AVE EL ARCO ST CAMINO ROSARITO 400 36 14400 Residential Asphalt 71 11/6/2023 COACH::LOSCABOSAV::2 LOS CABOS AVE CAMINO ROSARITO CAMINO CORTEZ 501 36 18036 Residential Asphalt 71 11/6/2023 COACH::LOSMOCHIS::1 LOS MOCHIS AVE JACKSON ST PLAYA DEL AMOR ST 196 44 8624 Residential Asphalt 79 11/6/2023 COACH::LUNADENICO::1 LUNA DE NICOLETA ST AGUA BLANCA AVE CALLE COLIMA 726 36 26136 Residential Asphalt 76 11/6/2023 COACH::LUNADENICO::2 LUNA DE NICOLETA ST CALLE COLIMA 140' N/O CALLE COLIMA 141 36 5076 Residential Asphalt 81 11/6/2023 COACH::LUNADENICO::3 LUNA DE NICOLETA ST 140' S/O PLAZA DE ORO AVE PLAZA DE ORO AVE 140 36 5040 Residential Asphalt 67 11/6/2023 COACH::LUNADENICO::4 LUNA DE NICOLETA ST PLAZA DE ORO AVE MARIANA AVE 350 36 12600 Residential Asphalt 70 11/6/2023 COACH::MAGNOLIAST::1 MAGNOLIA ST SUMMER ST BRIANNE LN 977 37 36149 Residential Asphalt 66 11/6/2023 COACH::MAHOGANYCT::1 MAHOGANY CT CDS SCARLET WAY 343 36 12348 Residential Asphalt 70 11/6/2023 COACH::MALIBUAVE::1 MALIBU AVE NEWPORT ST OCEANO RD 373 36 13428 Residential Asphalt 41 11/6/2023 COACH::MALVASIA::1 MALVASIA WAY PRIMITIVO DR RODREJO WAY 193 32 6176 Residential Asphalt 31 11/6/2023 COACH::MALVASIA::2 MALVASIA WAY RODREJO WAY MERCADO CIR 129 32 4128 Residential Asphalt 39 11/6/2023 COACH::MALVASIA::3 MALVASIA WAY MERCADO CIR CHARDONNAY CIR 397 32 12704 Residential Asphalt 42 11/6/2023 COACH::MALVASIA::4 MALVASIA WAY CHARDONNAY CIR PROSECCO WAY 195 32 6240 Residential Asphalt 45 11/6/2023 COACH::MANHATTAN::1 MANHATTAN AVE VAN BUREN ST MONARCH RD 587 36 21132 Residential Asphalt 69 11/6/2023 COACH::MARGARITA::1 MARGARITA AVE JAZMIN ST HIBISCO ST 1023 37 37851 Residential Asphalt 36 11/6/2023 COACH::MARIANAAVE::1 MARIANA AVE SOL DE LINDA ST CIELO VICTORIA ST 151 37 5587 Residential Asphalt 67 11/6/2023 COACH::MARIANAAVE::2 MARIANA AVE CIELO VICTORIA ST LUNA DE NICOLETA ST 293 37 10841 Residential Asphalt 63 11/6/2023 COACH::MARIANAAVE::3 MARIANA AVE LUNA DE NICOLETA ST ESTRELLA TOMAS ST 280 37 10360 Residential Asphalt 72 11/6/2023 COACH::MARIPOSADR::1 MARIPOSA DR PALMERAS CIR PALMERAS CIR 458 36 16488 Residential Asphalt 41 11/6/2023 COACH::MARYCT::1 MARY CT CHRISTINA RD CDS 193 32 6176 Residential Asphalt 64 11/6/2023 COACH::MAZATLANDR::1 MAZATLAN DR SALTILLO CIR MAZATLAN DR 186 32 5952 Residential Asphalt 64 11/6/2023 COACH::MAZATLANDR::2 MAZATLAN DR MAZATLAN DR SALTILLO CIR 189 32 6048 Residential Asphalt 62 11/6/2023 COACH::MAZATLANDR::3 MAZATLAN DR MAZATLAN DR MAZATLAN DR PARKING LOOP 194 32 6208 Residential Asphalt 45 11/6/2023 COACH::MAZATLANDR::4 MAZATLAN DR MAZATLAN DR PARKING LOOP CHIHUAHUA CT 216 32 6912 Residential Asphalt 57 11/6/2023 COACH::MAZATLANDR::5 MAZATLAN DR CHIHUAHUA CT TAXCO WAY 195 32 6240 Residential Asphalt 57 11/6/2023 COACH::MAZATLANDR::6 MAZATLAN DR MAZATLAN DR PARKING LOOP TAXCO WAY 311 32 9952 Residential Asphalt 54 11/6/2023 COACH::MAZATLANDR::7 MAZATLAN DR MAZATLAN DR PARKING LOOP MAZATLAN DR PARKING LOOP 270 32 8640 Residential Asphalt 60 11/6/2023 COACH::MAZATLANDR::8 MAZATLAN DR MAZATLAN DR PARKING LOOP MAZATLAN DR PARKING LOOP 540 32 17280 Residential Asphalt 83 11/6/2023 COACH::MAZATLANDR::9 MAZATLAN DR MAZATLAN DR PARKING LOOP 50TH AVE 366 32 11712 Residential Asphalt 71 11/6/2023 COACH::MCCOYPEAK::1 MCCOY PEAK AVE SAN GORGONIO ST ARICA DR 260 36 9360 Residential Asphalt 69 11/6/2023 COACH::MCCOYPEAK::2 MCCOY PEAK AVE ARICA DR CHAPARROSA ST 172 36 6192 Residential Asphalt 73 11/6/2023 COACH::MCCOYPEAK::3 MCCOY PEAK AVE CHAPARROSA ST SAN JACINTO LN 164 36 5904 Residential Asphalt 62 11/6/2023 COACH::MCCOYPEAK::4 MCCOY PEAK AVE SAN JACINTO LN PINTO LN 380 36 13680 Residential Asphalt 63 11/6/2023 COACH::MEADOWSLN::1 MEADOWS LN SIERRA ST PRIMA VERA 352 37 13024 Residential Asphalt 63 11/6/2023 COACH::MEADOWSLN::2 MEADOWS LN PRIMA VERA BRIANNE LN 337 37 12469 Residential Asphalt 66 11/6/2023 COACH::MECCAHILLS::1 MECCA HILLS AVE CHARLTON PEAK ST CHAPARROSA ST 557 36 20052 Residential Asphalt 65 11/6/2023 COACH::MECCAHILLS::2 MECCA HILLS AVE CHAPARROSA ST CDS 425 36 15300 Residential Asphalt 60 11/6/2023 COACH::MECCALANE::1 MECCA LANE BAGDAD AVE 670' N/O BAGDAD AVE 670 38 25460 Residential Asphalt 23 11/6/2023 COACH::MECCALANE::2 MECCA LANE 670' N/O BAGDAD AVE 51ST AVE 707 38 26866 Residential Asphalt 35 11/6/2023 COACH::MEDINAAVE::1 MEDINA AVE TRIPOLI WAY DATE AVE 660 38 25080 Residential Surface Treatment 69 11/6/2023 COACH::MERCADOCIR::1 MERCADO CIR MALVASIA WAY CDS 217 32 6944 Residential Asphalt 50 11/6/2023 COACH::MESACT::1 MESA CT LAS LUNAS AVE CDS 450 36 16200 Residential Asphalt 79 11/6/2023 COACH::MICHELLEDR::1 MICHELLE DR CALLE ALICIA MICHELLE DR 429 36 15444 Residential Asphalt 56 11/6/2023 COACH::MICHELLEDR::2 MICHELLE DR MICHELLE DR MICHELLE DR 225 36 8100 Residential Asphalt 73 11/6/2023 COACH::MICHELLEDR::3 MICHELLE DR AVENIDA NICOLE MICHELLE DR 393 36 14148 Residential Asphalt 66 11/6/2023 COACH::MICHELLEDR::4 MICHELLE DR AVENIDA ALEENAH AVENIDA NICOLE 165 36 5940 Residential Asphalt 80 11/6/2023 COACH::MIRAMARCT::1 MIRAMAR CT CDS NEWPORT ST 289 36 10404 Residential Asphalt 45 11/6/2023 COACH::MITCHELLDR::1 MITCHELL DR FREDERICK ST SH-111 667 38 25346 Collector Asphalt 65 11/6/2023 COACH::MODENATER::1 MODENA TER BELLISSIMA AVE SIENO LN 256 30 7680 Residential Asphalt 93 11/6/2023 COACH::MODENATER::2 MODENA TER SIENO LN CDS 517 30 15510 Residential Asphalt 100 11/6/2023 COACH::MONARCHRD::1 MONARCH RD CAPITOLA AVE MANHATTAN AVE 261 36 9396 Residential Asphalt 80 11/6/2023 COACH::MONARCHRD::2 MONARCH RD MANHATTAN AVE HUNTINGTON AVE 261 36 9396 Residential Asphalt 78 11/6/2023 COACH::MONZALANE::1 MONZA LANE TORINO PLACE CORTINA PLACE 560 36 20160 Residential Asphalt 100 11/6/2023 COACH::MOONLITDR::1 MOONLIT DR CRESCENT WAY VALLE POSADA 953 36 34308 Residential Asphalt 47 11/6/2023 COACH::MOONLITDR::2 MOONLIT DR VALLE POSADA VAN BUREN ST 210 36 7560 Residential Asphalt 49 11/6/2023 COACH::MORGANAVE::1 MORGAN AVE VALLEY RD 52ND AVE 1307 38 49666 Residential Surface Treatment 73 11/6/2023 COACH::NSIENNACIR::1 N SIENNA CIR W SIENNA CIR SLATE DR 251 36 9036 Residential Asphalt 70 11/6/2023 COACH::NSIENNACIR::2 N SIENNA CIR SLATE DR SAPPHIRE LN 266 36 9576 Residential Asphalt 67 11/6/2023 COACH::NSIENNACIR::3 N SIENNA CIR SAPPHIRE LN E SIENNA CIR 460 36 16560 Residential Asphalt 67 11/6/2023 COACH::NAOMICT::1 NAOMI CT LA PONDEROSA DR PEREZ ST 251 40 10040 Residential Asphalt 98 11/6/2023 A7
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::NAOMICT::2 NAOMI CT PEREZ ST CDS 156 40 6240 Residential Asphalt 91 11/6/2023 COACH::NAPOLILN::1 NAPOLI LN CDS GENOA ST 353 30 10590 Residential Asphalt 60 11/6/2023 COACH::NARCISOLN::1 NARCISO LN CALENDULA AVE CDS 286 36 10296 Residential Asphalt 43 11/6/2023 COACH::NELSONST::1 NELSON ST VALLEY RD 52ND AVE 1308 38 49704 Residential Surface Treatment 77 11/6/2023 COACH::NEWPORTST::1 NEWPORT ST MIRAMAR CT CAPITOLA AVE 259 36 9324 Residential Asphalt 51 11/6/2023 COACH::NEWPORTST::2 NEWPORT ST CAPITOLA AVE MALIBU AVE 258 36 9288 Residential Asphalt 47 11/6/2023 COACH::NEWPORTST::3 NEWPORT ST MALIBU AVE CATALINA AVE 258 36 9288 Residential Asphalt 60 11/6/2023 COACH::NEWPORTST::4 NEWPORT ST CATALINA AVE LA JOLLA AVE 262 36 9432 Residential Asphalt 41 11/6/2023 COACH::NICKLECREK::1 NICKLECREEK DR COPPERIDGE ST CINNABAR LN 989 37 36593 Residential Asphalt 77 11/6/2023 COACH::NIETOST::1 NIETO ST GUITRON ST ROMERO ST 280 34 9520 Residential Asphalt 50 11/6/2023 COACH::NILELN::1 NILE LN CDS GENOA ST 353 30 10590 Residential Asphalt 65 11/6/2023 COACH::OASISPALM::1 OASIS PALM AVE HEATHER LN VALLEY RD 561 38 21318 Residential Surface Treatment 63 11/6/2023 COACH::OASISPALM::2 OASIS PALM AVE VALLEY RD 52ND AVE 1311 38 49818 Residential Surface Treatment 78 11/6/2023 COACH::OATESLN::1 OATES LN OATES LN PETER RABBIT LN 536 33 17688 Collector Asphalt 40 11/6/2023 COACH::OATESLN::2 OATES LN OATES LN CITY LIMITS 1020 33 33660 Collector Asphalt 17 11/6/2023 COACH::OCEANORD::1 OCEANO RD CAPITOLA AVE MALIBU AVE 258 36 9288 Residential Asphalt 41 11/6/2023 COACH::OCEANORD::2 OCEANO RD MALIBU AVE CATALINA AVE 258 36 9288 Residential Asphalt 47 11/6/2023 COACH::OCEANORD::3 OCEANO RD CATALINA AVE CDS 239 36 8604 Residential Asphalt 47 11/6/2023 COACH::ORCHARDAVE::1 ORCHARD AVE 280' W/O SHADY LN SHADY LN 284 60 17040 Collector Asphalt 39 11/6/2023 COACH::ORCHARDAVE::10 ORCHARD AVE ALLEY 2ND ST 188 60 11280 Collector Asphalt 30 11/6/2023 COACH::ORCHARDAVE::11 ORCHARD AVE 2ND ST ALLEY 188 60 11280 Collector Asphalt 48 11/6/2023 COACH::ORCHARDAVE::12 ORCHARD AVE ALLEY 1ST ST 188 60 11280 Collector Asphalt 55 11/6/2023 COACH::ORCHARDAVE::2 ORCHARD AVE ORCHARD AVE 9TH ST 234 60 14040 Collector Asphalt 61 11/6/2023 COACH::ORCHARDAVE::3 ORCHARD AVE 9TH ST 8TH ST 375 60 22500 Collector Asphalt 50 11/6/2023 COACH::ORCHARDAVE::4 ORCHARD AVE 8TH ST 7TH ST 375 60 22500 Collector Asphalt 59 11/6/2023 COACH::ORCHARDAVE::5 ORCHARD AVE 7TH ST 6TH ST 325 60 19500 Collector Asphalt 50 11/6/2023 COACH::ORCHARDAVE::6 ORCHARD AVE 6TH ST 5TH ST 325 60 19500 Collector Asphalt 55 11/6/2023 COACH::ORCHARDAVE::7 ORCHARD AVE 5TH ST 4TH ST 325 60 19500 Collector Asphalt 54 11/6/2023 COACH::ORCHARDAVE::8 ORCHARD AVE 4TH ST 3RD ST 325 60 19500 Collector Asphalt 68 11/6/2023 COACH::ORCHARDAVE::9 ORCHARD AVE 3RD ST ALLEY 188 60 11280 Collector Asphalt 30 11/6/2023 COACH::ORQUIDEALN::1 ORQUIDEA LN CALENDULA AVE CDS 535 36 19260 Residential Asphalt 52 11/6/2023 COACH::ORTIZST::1 ORTIZ ST PEREZ ST HERNANDEZ ST 442 40 17680 Residential Asphalt 87 11/6/2023 COACH::PALERMOCT::1 PALERMO CT CDS CORTINA PLACE 343 36 12348 Residential Asphalt 100 11/6/2023 COACH::PALMAVE::1 PALM AVE 7TH ST 6TH ST 325 60 19500 Collector Asphalt 37 11/6/2023 COACH::PALMAVE::2 PALM AVE 6TH ST 5TH ST 325 60 19500 Collector Asphalt 36 11/6/2023 COACH::PALMAVE::3 PALM AVE 5TH ST 4TH ST 325 60 19500 Collector Asphalt 49 11/6/2023 COACH::PALMAVE::4 PALM AVE 4TH ST 3RD ST 325 60 19500 Collector Asphalt 55 11/6/2023 COACH::PALMAVE::5 PALM AVE 3RD ST ALLEY 188 60 11280 Collector Asphalt 59 11/6/2023 COACH::PALMAVE::6 PALM AVE ALLEY 2ND ST 188 60 11280 Collector Asphalt 63 11/6/2023 COACH::PALMAVE::7 PALM AVE 2ND ST ALLEY 188 60 11280 Collector Asphalt 48 11/6/2023 COACH::PALMAVE::8 PALM AVE ALLEY 1ST ST 188 60 11280 Collector Asphalt 71 11/6/2023 COACH::PALMERASCR::1 PALMERAS CIR PALOMA DR CARDINAL DR 460 36 16560 Residential Asphalt 22 11/6/2023 COACH::PALMERASCR::10 PALMERAS CIR PALOMA DR MARIPOSA DR 200 36 7200 Residential Asphalt 18 11/6/2023 COACH::PALMERASCR::11 PALMERAS CIR PALMERAS CIR PALOMA DR 271 36 9756 Residential Asphalt 35 11/6/2023 COACH::PALMERASCR::12 PALMERAS CIR CARDINAL DR PALMERAS CIR 166 36 5976 Residential Asphalt 18 11/6/2023 COACH::PALMERASCR::2 PALMERAS CIR PALOMA DR MARIPOSA DR 200 36 7200 Residential Asphalt 73 11/6/2023 COACH::PALMERASCR::3 PALMERAS CIR MARIPOSA DR CHUPAROSA DR 200 36 7200 Residential Asphalt 53 11/6/2023 COACH::PALMERASCR::4 PALMERAS CIR CHUPAROSA DR CARDELINA DR 200 36 7200 Residential Asphalt 16 11/6/2023 COACH::PALMERASCR::5 PALMERAS CIR CARDELINA DR PALMERAS CIR 200 36 7200 Residential Asphalt 48 11/6/2023 COACH::PALMERASCR::6 PALMERAS CIR PALMERAS CIR PALMERAS CIR 458 36 16488 Residential Asphalt 59 11/6/2023 COACH::PALMERASCR::7 PALMERAS CIR CARDELINA DR PALMERAS CIR 200 36 7200 Residential Asphalt 54 11/6/2023 COACH::PALMERASCR::8 PALMERAS CIR CHUPAROSA DR CARDELINA DR 200 36 7200 Residential Asphalt 36 11/6/2023 COACH::PALMERASCR::9 PALMERAS CIR MARIPOSA DR CHUPAROSA DR 200 36 7200 Residential Asphalt 34 11/6/2023 COACH::PALOMADR::1 PALOMA DR PALMERAS CIR PALMERAS CIR 458 36 16488 Residential Asphalt 46 11/6/2023 COACH::PALOMARCT::1 PALOMAR CT SAN JACINTO LN CDS 277 36 9972 Residential Asphalt 69 11/6/2023 COACH::PARKLN::1 PARK LN CITY LIMITS SH-86 601 30 18030 Collector Asphalt 55 11/6/2023 COACH::PARKLN::2 PARK LN SH-86 130' W/O SH-111 100 30 3000 Arterial Asphalt 58 11/6/2023 COACH::PARKLN::3 PARK LN 130' W/O SH-111 SH-111 127 30 3810 Arterial Asphalt 68 11/6/2023 COACH::PARKINGLOT::1 PARKING LOT 200' S/O BAGDAD AVE BAGDAD AVE 199 32 6368 Residential Asphalt 29 11/6/2023 COACH::PASEOBARCE::1 PASEO BARCELONA CALLE SEVILLE VIA MERIDA 506 36 18216 Residential Surface Treatment 96 11/6/2023 COACH::PASEOBARCE::2 PASEO BARCELONA VIA MERIDA CALLE SEGOVIA 296 36 10656 Residential Surface Treatment 89 11/6/2023 COACH::PASEOCADIZ::1 PASEO CADIZ CALLE SEVILLE CALLE SEGOVIA 802 36 28872 Residential Surface Treatment 93 11/6/2023 COACH::PASEOCORDO::1 PASEO CORDOVA VIA VALENCIA CALLE GRANADA 500 33 16500 Residential Surface Treatment 96 11/6/2023 COACH::PASEOLARED::1 PASEO LAREDO FREDERICK ST CALLE DE VEGA 159 40 6360 Residential Asphalt 98 11/6/2023 COACH::PASEOLARED::2 PASEO LAREDO CALLE DE VEGA AVENIDA CORTEZ 382 40 15280 Residential Asphalt 89 11/6/2023 COACH::PASEOMADRI::1 PASEO MADRID VIA VALENCIA CALLE GRANADA 500 33 16500 Residential Surface Treatment 86 11/6/2023 COACH::PAVONPALMA::1 PAVON PALMA 50TH AVE VERA CRUZ 180 40 7200 Residential Asphalt 70 11/6/2023 COACH::PEDRODR::1 PEDRO DR TOMAS LN AVENIDA DEL PARQUE 356 36 12816 Residential Asphalt 81 11/6/2023 COACH::PEDRODR::2 PEDRO DR AVENIDA DEL PARQUE AVENIDA ADOBE 411 36 14796 Residential Asphalt 74 11/6/2023 COACH::PENDLETON::1 PENDLETON WAY 7TH ST 9TH ST 752 40 30080 Collector Asphalt 67 11/6/2023 COACH::PEREZST::1 PEREZ ST NAOMI CT ROMUALDA CT 280 40 11200 Residential Asphalt 97 11/6/2023 COACH::PEREZST::2 PEREZ ST ROMUALDA CT ORTIZ ST 263 40 10520 Residential Asphalt 100 11/6/2023 COACH::PEREZST::3 PEREZ ST ORTIZ ST HERNANDEZ ST 431 40 17240 Residential Asphalt 83 11/6/2023 COACH::PETERRABBT::1 PETER RABBIT LN D/E 50TH AVE 1356 36 48816 Collector Asphalt 48 11/6/2023 COACH::PHOENIXAVE::1 PHOENIX AVE WASHINGTONIA AVE LIVISTONA CT 947 36 34092 Residential Asphalt 51 11/6/2023 COACH::PHOENIXAVE::2 PHOENIX AVE LIVISTONA CT KENTIA CT 270 36 9720 Residential Asphalt 43 11/6/2023 COACH::PHOENIXAVE::3 PHOENIX AVE KENTIA CT SABAL CT 270 36 9720 Residential Asphalt 44 11/6/2023 COACH::PHOENIXAVE::4 PHOENIX AVE SABAL CT HIBISCO ST 12 36 432 Residential Asphalt 100 11/6/2023 COACH::PHOENIXAVE::5 PHOENIX AVE HIBISCO ST FREDERICK ST 192 36 6912 Residential Asphalt 49 11/6/2023 COACH::PHOENIXCT::1 PHOENIX CT CDS WASHINGTONIA AVE 406 36 14616 Residential Asphalt 63 11/6/2023 COACH::PIERCEST::1 PIERCE ST 55TH AVE CITY LIMITS 1329 24 31896 Rural Asphalt 91 11/6/2023 COACH::PINTOLN::1 PINTO LN EAGLE AVE 120' S/O MCCOY PEAK AVE 144 36 5184 Residential Asphalt 58 11/6/2023 COACH::PINTOLN::2 PINTO LN 120' S/O MCCOY PEAK AVE MCCOY PEAK AVE 126 36 4536 Residential Asphalt 72 11/6/2023 COACH::PINTOLN::3 PINTO LN MCCOY PEAK AVE RIMROCK LN 310 36 11160 Residential Asphalt 65 11/6/2023 COACH::PISMOCT::1 PISMO CT CDS VENENTA BLVD 320 36 11520 Residential Asphalt 52 11/6/2023 COACH::PLAYADELAM::1 PLAYA DEL AMOR ST CAMINO BAHIA AVE PUERTECITOS AVE 290 36 10440 Residential Asphalt 76 11/6/2023 COACH::PLAYADELAM::3 PLAYA DEL AMOR ST PUERTECITOS AVE LOS MOCHIS AVE 810 36 29160 Residential Asphalt 74 11/6/2023 COACH::PLAYADELAM::4 PLAYA DEL AMOR ST LOS MOCHIS AVE PUEBLO BONITO AVE 188 36 6768 Residential Asphalt 76 11/6/2023 COACH::PLAYADELAM::5 PLAYA DEL AMOR ST PUEBLO BONITO AVE EL GRECO AVE 280 36 10080 Residential Asphalt 87 11/6/2023 COACH::PLAZADEORO::1 PLAZA DE ORO AVE SOL DE LINDA ST LUNA DE NICOLETA ST 444 36 15984 Residential Asphalt 75 11/6/2023 COACH::PLUMAAMARI::1 PLUMA AMARILLA PL PLUMA DORADA CT LAS PLUMAS CT 179 36 6444 Residential Surface Treatment 81 11/6/2023 COACH::PLUMAAMARI::2 PLUMA AMARILLA PL LAS PLUMAS CT PLUMA AZUL CT 180 36 6480 Residential Surface Treatment 87 11/6/2023 COACH::PLUMAAZUL::1 PLUMA AZUL CT PLUMA BLANCA PL PLUMA ROJA PL 291 36 10476 Residential Surface Treatment 83 11/6/2023 COACH::PLUMAAZUL::2 PLUMA AZUL CT PLUMA ROJA PL PLUMA GRIS PL 260 36 9360 Residential Surface Treatment 84 11/6/2023 COACH::PLUMAAZUL::3 PLUMA AZUL CT PLUMA GRIS PL PLUMA AMARILLA PL 291 36 10476 Residential Surface Treatment 85 11/6/2023 COACH::PLUMABLANC::1 PLUMA BLANCA PL PLUMA DORADA CT LAS PLUMAS CT 181 36 6516 Residential Surface Treatment 88 11/6/2023 COACH::PLUMABLANC::2 PLUMA BLANCA PL LAS PLUMAS CT PLUMA AZUL CT 178 36 6408 Residential Surface Treatment 94 11/6/2023 COACH::PLUMADORAD::1 PLUMA DORADA CT PLUMA BLANCA PL PLUMA ROJA PL 291 36 10476 Residential Surface Treatment 80 11/6/2023 COACH::PLUMADORAD::2 PLUMA DORADA CT PLUMA ROJA PL PLUMA GRIS PL 260 36 9360 Residential Surface Treatment 93 11/6/2023 COACH::PLUMADORAD::3 PLUMA DORADA CT PLUMA GRIS PL PLUMA AMARILLA PL 291 36 10476 Residential Surface Treatment 87 11/6/2023 COACH::PLUMAGRIS::1 PLUMA GRIS PL PLUMA DORADA CT PLUMA AZUL CT 469 36 16884 Residential Surface Treatment 87 11/6/2023 COACH::PLUMANEGRA::1 PLUMA NEGRA CT PLUMA VERDE PL PLUMA BLANCA PL 255 36 9180 Residential Surface Treatment 79 11/6/2023 COACH::PLUMAROJA::1 PLUMA ROJA PL PLUMA DORADA CT PLUMA AZUL CT 469 36 16884 Residential Surface Treatment 94 11/6/2023 COACH::PLUMAVERDE::1 PLUMA VERDE PL CDS LAS PLUMAS CT 216 36 7776 Residential Surface Treatment 91 11/6/2023 COACH::PLUMAVERDE::2 PLUMA VERDE PL LAS PLUMAS CT CDS 216 36 7776 Residential Surface Treatment 85 11/6/2023 COACH::POLKST::1 POLK ST 54TH AVE 1330' S/O INDUSTRIAL WAY 2739 46 125994 Collector Asphalt 68 11/6/2023 COACH::POLKST::2 POLK ST 1330' S/O INDUSTRIAL WAY 610' S/O INDUSTRIAL WAY 721 46 33166 Collector Asphalt 73 11/6/2023 COACH::POLKST::3 POLK ST 610' S/O INDUSTRIAL WAY INDUSTRIAL WAY 615 46 28290 Collector Asphalt 67 11/6/2023 COACH::POLKST::4 POLK ST 52ND AVE 2160' N/O 52ND AVE 2168 30 65040 Rural Asphalt 15 11/6/2023 COACH::POLKST::5 POLK ST 2160' N/O 52ND AVE 50TH AVE 1932 30 57960 Rural Asphalt 30 11/6/2023 COACH::PRIMAVERA::1 PRIMA VERA MEADOWS LN 49TH AVE 188 36 6768 Residential Asphalt 48 11/6/2023 COACH::PRIMITIVO::1 PRIMITIVO DR PRIMITIVO DR MALVASIA WAY 267 32 8544 Residential Asphalt 31 11/6/2023 COACH::PRIMITIVO::2 PRIMITIVO DR PRIMITIVO DR PRIMITIVO DR 97 32 3104 Residential Asphalt 38 11/6/2023 COACH::PRIMITIVO::3 PRIMITIVO DR PRIMITIVO DR VERMOUTH DR 758 32 24256 Residential Asphalt 29 11/6/2023 COACH::PRIMITIVO::4 PRIMITIVO DR VERMOUTH DR 52ND AVE 363 32 11616 Residential Asphalt 30 11/6/2023 COACH::PROSECCO::1 PROSECCO WAY RODREJO WAY ALLENDE DR 185 32 5920 Residential Asphalt 51 11/6/2023 COACH::PROSECCO::2 PROSECCO WAY RODREJO WAY PROSECCO WAY 127 32 4064 Residential Asphalt 62 11/6/2023 COACH::PROSECCO::3 PROSECCO WAY SOLARCE ST SOLARCE ST 200 32 6400 Residential Asphalt 55 11/6/2023 COACH::PROSECCO::4 PROSECCO WAY SOLARCE ST MALVASIA WAY 152 32 4864 Residential Asphalt 63 11/6/2023 COACH::PUEBLOBONI::1 PUEBLO BONITO AVE PLAYA DEL AMOR ST EL ACRO ST 280 36 10080 Residential Asphalt 81 11/6/2023 COACH::PUEBLOBONI::2 PUEBLO BONITO AVE EL ACRO ST EL CASTILLO RD 280 36 10080 Residential Asphalt 72 11/6/2023 COACH::PUEBLOBONI::3 PUEBLO BONITO AVE EL CASTILLO RD TAXCO AVE 306 36 11016 Residential Asphalt 83 11/6/2023 COACH::PUERTECITO::1 PUERTECITOS AVE JACKSON ST PLAYA DEL AMOR ST 199 44 8756 Residential Asphalt 82 11/6/2023 COACH::PUERTOESCO::1 PUERTO ESCONDIDO AVE CAMINO CORTEZ CHICHEN ITZA RD 1095 36 39420 Residential Asphalt 50 11/6/2023 COACH::QUAILMOUNT::1 QUAIL MOUNTAIN TER SAN GORGONIO ST ARICA DR 320 36 11520 Residential Asphalt 65 11/6/2023 COACH::QUEENCT::1 QUEEN CT CDS WASHINGTONIA AVE 317 34 10778 Residential Asphalt 76 11/6/2023 COACH::REDMOUNT::1 RED MOUNTAIN PL GRANITE PASS TRL COXCOMB DR 260 36 9360 Residential Asphalt 67 11/6/2023 COACH::REDONDOEST::1 REDONDO ESTE REDONDO SUR AVENIDA VESTAGO 338 36 12168 Residential Asphalt 68 11/6/2023 COACH::REDONDOEST::2 REDONDO ESTE AVENIDA VESTAGO REDONDO NORTE 331 36 11916 Residential Asphalt 64 11/6/2023 COACH::REDONDONOR::1 REDONDO NORTE REDONDO PONIENTE CORTE MOLINO 265 36 9540 Residential Asphalt 68 11/6/2023 COACH::REDONDONOR::2 REDONDO NORTE CORTE MOLINO CALLE QUINTERRA 290 36 10440 Residential Asphalt 62 11/6/2023 COACH::REDONDONOR::3 REDONDO NORTE CALLE QUINTERRA REDONDO ESTE 430 36 15480 Residential Asphalt 38 11/6/2023 COACH::REDONDOPON::1 REDONDO PONIENTE REDONDO SUR REDONDO NORTE 670 40 26800 Residential Asphalt 70 11/6/2023 COACH::REDONDOSUR::1 REDONDO SUR REDONDO PONIENTE CALLE QUINTERRA 430 37 15910 Residential Asphalt 63 11/6/2023 A8
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::REDONDOSUR::2 REDONDO SUR CALLE QUINTERRA CORTE PERCEBE 288 37 10656 Residential Asphalt 58 11/6/2023 COACH::REDONDOSUR::3 REDONDO SUR CORTE PERCEBE REDONDO ESTE 271 37 10027 Residential Asphalt 64 11/6/2023 COACH::REYESST::1 REYES ST GUITRON ST ROMERO ST 280 34 9520 Residential Asphalt 59 11/6/2023 COACH::RHAPISCT::1 RHAPIS CT CDS WASHINGTONIA AVE 407 34 13838 Residential Asphalt 68 11/6/2023 COACH::RIGOCT::1 RIGO CT CHRISTINA RD CDS 186 32 5952 Residential Asphalt 74 11/6/2023 COACH::RIMROCKLN::1 RIMROCK LN SAN JACINTO LN PINTO LN 370 36 13320 Residential Asphalt 68 11/6/2023 COACH::RIORANCHO::1 RIO RANCHO CT LAS LUNAS AVE CDS 450 36 16200 Residential Asphalt 78 11/6/2023 COACH::RODREJOWAY::1 RODREJO WAY MALVASIA WAY PROSECCO WAY 560 34 19040 Residential Asphalt 54 11/6/2023 COACH::ROMEROST::1 ROMERO ST REYES ST NIETO ST 997 34 33898 Residential Asphalt 49 11/6/2023 COACH::ROMUALDACT::1 ROMUALDA CT PEREZ ST CDS 153 40 6120 Residential Asphalt 93 11/6/2023 COACH::ROSALAVE::1 ROSAL AVE TULIPAN ST HIBISCO ST 768 37 28416 Residential Asphalt 30 11/6/2023 COACH::ROYALCT::1 ROYAL CT CDS WASHINGTONIA AVE 310 34 10540 Residential Asphalt 77 11/6/2023 COACH::SBALBOAST::1 S BALBOA ST WESTERFIELD WAY CDS 573 36 20628 Residential Asphalt 72 11/6/2023 COACH::SCORONADO::1 S CORONADO ST WESTERFIELD WAY CDS 574 36 20664 Residential Asphalt 67 11/6/2023 COACH::SKENMOREST::1 S KENMORE ST WESTERFIELD WAY CDS 574 36 20664 Residential Asphalt 67 11/6/2023 COACH::SABALCT::1 SABAL CT CDS PHOENIX AVE 208 30 6240 Residential Asphalt 59 11/6/2023 COACH::SAGRADODR::1 SAGRADO DR SAN SOLANO RD CALHOUN ST 168 40 6720 Residential Brick N/A COACH::SALTILLOCR::1 SALTILLO CIR CHIAPAS DR JALISCO AVE 192 26 4992 Residential Asphalt 67 11/6/2023 COACH::SALTILLOCR::2 SALTILLO CIR JALISCO AVE JALISCO AVE 165 26 4290 Residential Asphalt 72 11/6/2023 COACH::SALTILLOCR::3 SALTILLO CIR MAZATLAN DR JALISCO AVE 158 26 4108 Residential Asphalt 61 11/6/2023 COACH::SALTILLOCR::4 SALTILLO CIR MAZATLAN DR MAZATLAN DR 181 26 4706 Residential Asphalt 59 11/6/2023 COACH::SALTILLOCR::5 SALTILLO CIR CHIAPAS DR MAZATLAN DR 279 26 7254 Residential Asphalt 69 11/6/2023 COACH::SANASISDR::1 SAN ASIS DR CDS SOLEDAD PL 270 40 10800 Residential Asphalt 78 11/6/2023 COACH::SANASISDR::2 SAN ASIS DR SOLEDAD PL CALLE TOLOSA 265 40 10600 Residential Asphalt 70 11/6/2023 COACH::SANASISDR::3 SAN ASIS DR CALLE TOLOSA SAN CAPISTRANO DR 260 40 10400 Residential Asphalt 76 11/6/2023 COACH::SANASISDR::4 SAN ASIS DR SAN CAPISTRANO DR SAN SOLANO RD 260 40 10400 Residential Asphalt 67 11/6/2023 COACH::SANCAPISTR::1 SAN CAPISTRANO DR SAN ASIS DR SAN REY DR 1000 40 40000 Residential Asphalt 52 11/6/2023 COACH::SANGORGONI::1 SAN GORGONIO ST EAGLE AVE MCCOY PEAK AVE 270 36 9720 Residential Asphalt 68 11/6/2023 COACH::SANGORGONI::2 SAN GORGONIO ST MCCOY PEAK AVE QUAIL MOUNTAIN TER 610 36 21960 Residential Asphalt 61 11/6/2023 COACH::SANIGNACIO::1 SAN IGNACIO AVE CHICHEN ITZA RD CALHOUN ST 194 44 8536 Residential Asphalt 87 11/6/2023 COACH::SANJACINTO::1 SAN JACINTO LN MCCOY PEAK AVE RIMROCK LN 311 36 11196 Residential Asphalt 62 11/6/2023 COACH::SANJACINTO::2 SAN JACINTO LN RIMROCK LN PALOMAR CT 316 36 11376 Residential Asphalt 68 11/6/2023 COACH::SANMATEOAV::1 SAN MATEO AVE CHARLTON PEAK ST GARNET RIDGE ST 269 36 9684 Residential Asphalt 57 11/6/2023 COACH::SANMATEOAV::2 SAN MATEO AVE GARNET RIDGE ST CHAPARROSA ST 287 36 10332 Residential Asphalt 68 11/6/2023 COACH::SANMATEOAV::3 SAN MATEO AVE CHAPARROSA ST CDS 425 36 15300 Residential Asphalt 59 11/6/2023 COACH::SANREYDR::1 SAN REY DR CALLE TOLOSA COLONIA DR 160 40 6400 Residential Asphalt 61 11/6/2023 COACH::SANREYDR::2 SAN REY DR COLONIA DR SAN CAPISTRANO DR 100 40 4000 Residential Asphalt 60 11/6/2023 COACH::SANREYDR::3 SAN REY DR SAN CAPISTRANO DR SAN SOLANO RD 260 40 10400 Residential Asphalt 50 11/6/2023 COACH::SANSOLANO::1 SAN SOLANO RD SAN ASIS DR SAGRADO DR 410 40 16400 Residential Asphalt 73 11/6/2023 COACH::SANSOLANO::2 SAN SOLANO RD SAGRADO DR SAN REY DR 591 40 23640 Residential Asphalt 69 11/6/2023 COACH::SANTOLN::1 SANTO LN SOLEDAD PL CALLE TOLOSA 265 40 10600 Residential Asphalt 69 11/6/2023 COACH::SAPPHIRELN::1 SAPPHIRE LN SCARLET WAY N SIENNA CIR 652 36 23472 Residential Asphalt 70 11/6/2023 COACH::SCARLETWAY::1 SCARLET WAY SLATE DR SAPPHIRE LN 273 36 9828 Residential Asphalt 72 11/6/2023 COACH::SCARLETWAY::2 SCARLET WAY SAPPHIRE LN E SIENNA CIR 421 36 15156 Residential Asphalt 73 11/6/2023 COACH::SCARLETWAY::3 SCARLET WAY E SIENNA CIR FREDERICK ST 184 36 6624 Residential Asphalt 78 11/6/2023 COACH::SEDONACT::1 SEDONA CT LAS LUNAS AVE CDS 450 36 16200 Residential Asphalt 76 11/6/2023 COACH::SERPENTINE::1 SERPENTINE WAY CDS CINNABAR LN 352 37 13024 Residential Asphalt 50 11/6/2023 COACH::SH-111::1 SH-111 54TH AVE TYLER ST 5278 50 263900 Arterial Asphalt 81 11/6/2023 COACH::SH-111::14 SH-111 50TH AVE PARK LN 1025 50 51250 Arterial Asphalt 86 11/6/2023 COACH::SH-111::15 SH-111 PARK LN SH-86 699 50 34950 Arterial Asphalt 57 11/6/2023 COACH::SH-111::2 SH-111 TYLER ST 52ND AVE 1301 50 65050 Arterial Asphalt 83 11/6/2023 COACH::SH-111::3 SH-111 52ND AVE HILL DR 1230 50 61500 Arterial Asphalt 69 11/6/2023 COACH::SH-111::4 SH-111 HILL DR 9TH ST 1724 50 86200 Arterial Asphalt 71 11/6/2023 COACH::SH-111N::10 SH-111 4TH ST 3RD ST 325 50 16250 Arterial Asphalt 100 11/6/2023 COACH::SH-111N::11 SH-111 3RD ST 2ND ST 375 50 18750 Arterial Asphalt 100 11/6/2023 COACH::SH-111N::12 SH-111 2ND ST 1ST ST 375 50 18750 Arterial Asphalt 100 11/6/2023 COACH::SH-111N::13 SH-111 1ST ST 50TH AVE 819 50 40950 Arterial Asphalt 100 11/6/2023 COACH::SH-111N::16 SH-111 SH-86 SH-86 1435 50 71750 Arterial Asphalt 61 11/6/2023 COACH::SH-111N::17 SH-111 49TH AVE MITCHELL DR 1569 50 78450 Arterial Asphalt 57 11/6/2023 COACH::SH-111N::18 SH-111 MITCHELL DR 48TH AVE 1807 50 90350 Arterial Asphalt 63 11/6/2023 COACH::SH-111N::5 SH-111 9TH ST 8TH ST 378 50 18900 Arterial Asphalt 100 11/6/2023 COACH::SH-111N::6 SH-111 8TH ST 7TH ST 375 50 18750 Arterial Asphalt 100 11/6/2023 COACH::SH-111N::7 SH-111 7TH ST 6TH ST 325 50 16250 Arterial Asphalt 100 11/6/2023 COACH::SH-111N::8 SH-111 6TH ST 5TH ST 325 50 16250 Arterial Asphalt 100 11/6/2023 COACH::SH-111N::9 SH-111 5TH ST 4TH ST 325 50 16250 Arterial Asphalt 100 11/6/2023 COACH::SH-111S::1 SH-111 48TH AVE MITCHELL DR 1771 50 88550 Arterial Asphalt 37 11/6/2023 COACH::SH-111S::10 SH-111 6TH ST 7TH ST 325 50 16250 Arterial Surface Treatment 75 11/6/2023 COACH::SH-111S::11 SH-111 7TH ST 8TH ST 375 50 18750 Arterial Surface Treatment 97 11/6/2023 COACH::SH-111S::12 SH-111 8TH ST 9TH ST 378 50 18900 Arterial Surface Treatment 94 11/6/2023 COACH::SH-111S::2 SH-111 49TH AVE MITCHELL DR 1578 50 78900 Arterial Asphalt 58 11/6/2023 COACH::SH-111S::3 SH-111 49TH AVE SH-86 1462 50 73100 Arterial Asphalt 64 11/6/2023 COACH::SH-111S::4 SH-111 1ST ST 50TH AVE 726 50 36300 Arterial Surface Treatment 87 11/6/2023 COACH::SH-111S::5 SH-111 1ST ST 2ND ST 375 50 18750 Arterial Surface Treatment 90 11/6/2023 COACH::SH-111S::6 SH-111 2ND ST 3RD ST 375 50 18750 Arterial Surface Treatment 92 11/6/2023 COACH::SH-111S::7 SH-111 3RD ST 4TH ST 325 50 16250 Arterial Surface Treatment 96 11/6/2023 COACH::SH-111S::8 SH-111 4TH ST 5TH ST 325 50 16250 Arterial Surface Treatment 87 11/6/2023 COACH::SH-111S::9 SH-111 5TH ST 6TH ST 325 50 16250 Arterial Surface Treatment 86 11/6/2023 COACH::SH-86N::1 SH-86 54TH AVE 53RD AVE 2650 80 212000 Arterial Asphalt 77 11/6/2023 COACH::SH-86N::10 SH-86 DAMASCUS AVE BAGDAD AVE 334 80 26720 Arterial Asphalt 83 11/6/2023 COACH::SH-86N::11 SH-86 BAGDAD AVE BAGDAD AVE 64 80 5120 Arterial Asphalt 84 11/6/2023 COACH::SH-86N::12 SH-86 BAGDAD AVE 6TH ST 347 80 27760 Arterial Asphalt 86 11/6/2023 COACH::SH-86N::13 SH-86 6TH ST 4TH ST 924 80 73920 Arterial Asphalt 74 11/6/2023 COACH::SH-86N::14 SH-86 4TH ST ALLEY 986 80 78880 Arterial Asphalt 73 11/6/2023 COACH::SH-86N::15 SH-86 ALLEY WESTERFIELD WAY 336 80 26880 Arterial Asphalt 88 11/6/2023 COACH::SH-86N::16 SH-86 WESTERFIELD WAY 50TH AVE 1322 80 105760 Arterial Asphalt 64 11/6/2023 COACH::SH-86N::17 SH-86 50TH AVE PARK LN 1034 80 82720 Arterial Asphalt 65 11/6/2023 COACH::SH-86N::18 SH-86 PARK LN SH-111 558 80 44640 Arterial Asphalt 44 11/6/2023 COACH::SH-86N::2 SH-86 53RD AVE CALLE ZAMORA 661 80 52880 Arterial Asphalt 81 11/6/2023 COACH::SH-86N::3 SH-86 CALLE ZAMORA CALLE VERDE 659 80 52720 Arterial Asphalt 83 11/6/2023 COACH::SH-86N::4 SH-86 CALLE VERDE CALLE ROJO 648 80 51840 Arterial Asphalt 86 11/6/2023 COACH::SH-86N::5 SH-86 CALLE ROJO 52ND AVE 596 80 47680 Arterial Asphalt 69 11/6/2023 COACH::SH-86N::6 SH-86 52ND AVE ALLEY 560 80 44800 Arterial Asphalt 62 11/6/2023 COACH::SH-86N::7 SH-86 ALLEY CAIRO AVE 107 80 8560 Arterial Asphalt 81 11/6/2023 COACH::SH-86N::8 SH-86 CAIRO AVE CAIRO AVE 32 80 2560 Arterial Asphalt 70 11/6/2023 COACH::SH-86N::9 SH-86 CAIRO AVE DAMASCUS AVE 302 80 24160 Arterial Asphalt 73 11/6/2023 COACH::SH-86S::1 SH-86 SH-111 PARK LN 545 80 43600 Arterial Asphalt 34 11/6/2023 COACH::SH-86S::10 SH-86 DAMASCUS AVE CAIRO AVE 302 80 24160 Arterial Asphalt 87 11/6/2023 COACH::SH-86S::11 SH-86 CAIRO AVE CAIRO AVE 32 80 2560 Arterial Asphalt 86 11/6/2023 COACH::SH-86S::12 SH-86 CAIRO AVE ALLEY 107 80 8560 Arterial Asphalt 70 11/6/2023 COACH::SH-86S::13 SH-86 ALLEY 52ND AVE 560 80 44800 Arterial Asphalt 56 11/6/2023 COACH::SH-86S::14 SH-86 52ND AVE CALLE ROJO 596 80 47680 Arterial Asphalt 73 11/6/2023 COACH::SH-86S::15 SH-86 CALLE ROJO CALLE VERDE 648 80 51840 Arterial Asphalt 80 11/6/2023 COACH::SH-86S::16 SH-86 CALLE VERDE CALLE ZAMORA 659 80 52720 Arterial Asphalt 83 11/6/2023 COACH::SH-86S::17 SH-86 CALLE ZAMORA 53RD AVE 661 80 52880 Arterial Asphalt 81 11/6/2023 COACH::SH-86S::18 SH-86 53RD AVE 54TH AVE 2650 80 212000 Arterial Asphalt 71 11/6/2023 COACH::SH-86S::2 SH-86 PARK LN 50TH AVE 1024 80 81920 Arterial Asphalt 79 11/6/2023 COACH::SH-86S::3 SH-86 50TH AVE WESTERFIELD WAY 1322 80 105760 Arterial Asphalt 77 11/6/2023 COACH::SH-86S::4 SH-86 WESTERFIELD WAY ALLEY 336 80 26880 Arterial Asphalt 71 11/6/2023 COACH::SH-86S::5 SH-86 ALLEY 4TH ST 986 80 78880 Arterial Asphalt 69 11/6/2023 COACH::SH-86S::6 SH-86 4TH ST 6TH ST 924 80 73920 Arterial Asphalt 78 11/6/2023 COACH::SH-86S::7 SH-86 6TH ST BAGDAD AVE 347 80 27760 Arterial Asphalt 86 11/6/2023 COACH::SH-86S::8 SH-86 BAGDAD AVE BAGDAD AVE 64 80 5120 Arterial Asphalt 66 11/6/2023 COACH::SH-86S::9 SH-86 BAGDAD AVE DAMASCUS AVE 334 80 26720 Arterial Asphalt 84 11/6/2023 COACH::SHADOWROCK::1 SHADOWROCK DR CALHOUN ST COPPERIDGE ST 191 37 7067 Residential Asphalt 40 11/6/2023 COACH::SHADOWROCK::2 SHADOWROCK DR COPPERIDGE ST CINNABAR LN 989 37 36593 Residential Asphalt 42 11/6/2023 COACH::SHADYLN::1 SHADY LN 54TH AVE AVENIDA YUCATECO 357 56 19992 Residential Surface Treatment 94 11/6/2023 COACH::SHADYLN::10 SHADY LN 53RD AVE STACIE LN 193 56 10808 Residential Surface Treatment 32 11/6/2023 COACH::SHADYLN::11 SHADY LN STACIE LN BRENDA LN 265 56 14840 Residential Surface Treatment 68 11/6/2023 COACH::SHADYLN::12 SHADY LN BRENDA LN HEATHER LN 270 56 15120 Residential Surface Treatment 57 11/6/2023 COACH::SHADYLN::13 SHADY LN HEATHER LN VALENCIA LN 284 56 15904 Residential Surface Treatment 50 11/6/2023 COACH::SHADYLN::14 SHADY LN VALLEY RD 52ND AVE 1314 38 49932 Residential Surface Treatment 79 11/6/2023 COACH::SHADYLN::15 SHADY LN 52ND AVE ARABY AVE 336 56 18816 Collector Asphalt 35 11/6/2023 COACH::SHADYLN::16 SHADY LN ARABY AVE CAIRO AVE 324 56 18144 Collector Asphalt 30 11/6/2023 COACH::SHADYLN::17 SHADY LN BAGDAD AVE ORCHARD AVE 422 56 23632 Collector Asphalt 30 11/6/2023 COACH::SHADYLN::18 SHADY LN CAIRO AVE BAGDAD AVE 660 56 36960 Collector Asphalt 47 11/6/2023 COACH::SHADYLN::19 SHADY LN ORCHARD AVE 9TH ST 460 56 25760 Collector Asphalt 39 11/6/2023 COACH::SHADYLN::2 SHADY LN AVENIDA YUCATECO AVENIDA TACUBA 240 56 13440 Residential Surface Treatment 85 11/6/2023 COACH::SHADYLN::3 SHADY LN AVENIDA TACUBA AVENIDA REFORMA 358 56 20048 Residential Surface Treatment 99 11/6/2023 COACH::SHADYLN::4 SHADY LN AVENIDA REFORMA AVENIDA DEL PRADO 240 56 13440 Residential Surface Treatment 69 11/6/2023 COACH::SHADYLN::5 SHADY LN D/E VIA MISIONERO 129 56 7224 Residential Asphalt 79 11/6/2023 COACH::SHADYLN::6 SHADY LN VIA MISIONERO DIEGO CT 276 56 15456 Residential Asphalt 86 11/6/2023 COACH::SHADYLN::7 SHADY LN DIEGO CT GUADALUPANA CT 285 56 15960 Residential Asphalt 77 11/6/2023 COACH::SHADYLN::8 SHADY LN GUADALUPANA CT VIA TEPEYAC 276 56 15456 Residential Asphalt 82 11/6/2023 COACH::SHADYLN::9 SHADY LN VIA TEPEYAC 53RD AVE 348 56 19488 Residential Asphalt 79 11/6/2023 A9
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::SIENOLN::1 SIENA LN MODENA TER TORINO PLACE 261 36 9396 Residential Asphalt 100 11/6/2023 COACH::SIENOLN::2 SIENA LN TORINO PLACE CORTINA PLACE 613 36 22068 Residential Asphalt 99 11/6/2023 COACH::SIERRAST::1 SIERRA ST FIESTA RD TERA VISTA 256 37 9472 Residential Asphalt 66 11/6/2023 COACH::SIERRAST::2 SIERRA ST TERA VISTA MEADOWS LN 254 37 9398 Residential Asphalt 68 11/6/2023 COACH::SLATEDR::1 SLATE DR 54TH AVE W SIENNA CIR 202 36 7272 Residential Asphalt 84 11/6/2023 COACH::SLATEDR::2 SLATE DR W SIENNA CIR SCARLET WAY 257 36 9252 Residential Asphalt 73 11/6/2023 COACH::SLATEDR::3 SLATE DR SCARLET WAY N SIENNA CIR 762 36 27432 Residential Asphalt 77 11/6/2023 COACH::SLATEDR::4 SLATE DR N SIENNA CIR D/E 142 36 5112 Residential Asphalt 76 11/6/2023 COACH::SOLDELINDA::1 SOL DE LINDA ST PLAZA DE ORO AVE MARIANA AVE 350 40 14000 Residential Asphalt 74 11/6/2023 COACH::SOLARCEST::1 SOLARCE ST PROSECCO WAY SOLARCE ST 194 34 6596 Residential Asphalt 53 11/6/2023 COACH::SOLARCEST::2 SOLARCE ST PROSECCO WAY SOLARCE ST 159 34 5406 Residential Asphalt 51 11/6/2023 COACH::SOLARCEST::3 SOLARCE ST SOLARCE ST ALLENDE DR 131 34 4454 Residential Asphalt 47 11/6/2023 COACH::SOLARCEST::4 SOLARCE ST ALLENDE DR FREDERICK ST 238 34 8092 Residential Asphalt 47 11/6/2023 COACH::SOLEDADPL::1 SOLEDAD PL SAN ASIS DR SANTO LN 385 40 15400 Residential Asphalt 75 11/6/2023 COACH::STACIELN::1 STACIE LN CDS SHADY LN 634 40 25360 Residential Surface Treatment 62 11/6/2023 COACH::SUEZRD::1 SUEZ RD CAIRO AVE DAMASCUS AVE 334 20 6680 Residential Asphalt 63 11/6/2023 COACH::SUEZRD::2 SUEZ RD DAMASCUS AVE BAGDAD AVE 334 20 6680 Residential Asphalt 55 11/6/2023 COACH::SUMMERST::1 SUMMER ST CALENDULA AVE MAGNOLIA ST 262 37 9694 Residential Asphalt 65 11/6/2023 COACH::SUMMERST::2 SUMMER ST FIESTA RD CDS 478 37 17686 Residential Asphalt 71 11/6/2023 COACH::SUMMERST::3 SUMMER ST MAGNOLIA ST FIESTA RD 255 37 9435 Residential Asphalt 69 11/6/2023 COACH::SUNBURSTST::1 SUNBURST ST SUNSHINE AVE SUNRISE AVE 846 40 33840 Residential Asphalt 67 11/6/2023 COACH::SUNCRESTST::1 SUNCREST ST 51ST AVE SUNSHINE AVE 188 40 7520 Residential Asphalt 71 11/6/2023 COACH::SUNCRESTST::2 SUNCREST ST SUNSHINE AVE SUNDANCE LN 302 40 12080 Residential Asphalt 70 11/6/2023 COACH::SUNCRESTST::3 SUNCREST ST SUNDANCE LN SUNDOWN LN 286 40 11440 Residential Asphalt 78 11/6/2023 COACH::SUNCRESTST::4 SUNCREST ST SUNDOWN LN SUNRISE AVE 270 40 10800 Residential Asphalt 57 11/6/2023 COACH::SUNCRESTST::5 SUNCREST ST SUNRISE AVE WESTERFIELD WAY 288 40 11520 Residential Asphalt 56 11/6/2023 COACH::SUNDANCELN::1 SUNDANCE LN CDS SUNCREST ST 498 40 19920 Residential Asphalt 63 11/6/2023 COACH::SUNDOWNLN::1 SUNDOWN LN CDS SUNCREST ST 450 40 18000 Residential Asphalt 56 11/6/2023 COACH::SUNRISEAVE::1 SUNRISE AVE SUNBURST ST SUNCREST ST 686 40 27440 Residential Asphalt 60 11/6/2023 COACH::SUNSETDR::1 SUNSET DR 52ND AVE SH-111 1072 88 94336 Arterial Asphalt 76 11/6/2023 COACH::SUNSETDR::2 SUNSET DR 52ND AVE HILL DR 934 38 35492 Residential Asphalt 58 11/6/2023 COACH::SUNSHINEAV::1 SUNSHINE AVE SUNBURST ST SUNCREST ST 823 40 32920 Residential Asphalt 60 11/6/2023 COACH::SYLMARLN::1 SYLMAR LN CDS GENOA ST 353 30 10590 Residential Asphalt 66 11/6/2023 COACH::TABASCOCT::1 TABASCO CT CHIAPAS DR CDS 153 28 4284 Residential Asphalt 48 11/6/2023 COACH::TAXCOAVE::1 TAXCO AVE PUEBLO BONITO AVE EL GRECO AVE 280 40 11200 Residential Asphalt 87 11/6/2023 COACH::TAXCOWAY::1 TAXCO WAY MAZATLAN DR JALISCO AVE 369 28 10332 Residential Asphalt 57 11/6/2023 COACH::TEPEYACCT::1 TEPEYAC CT VIA TEPEYAC CDS 146 36 5256 Residential Asphalt 75 11/6/2023 COACH::TERAVISTA::1 TERA VISTA SIERRA ST BRIANNE LN 691 37 25567 Residential Asphalt 70 11/6/2023 COACH::TIJSSELING::1 TIJSSELING CT 52ND AVE CDS 322 36 11592 Residential Asphalt 70 11/6/2023 COACH::TODOSSANTO::1 TODOS SANTOS AVE EL ARCO ST EL CASTILLO RD 280 36 10080 Residential Asphalt 69 11/6/2023 COACH::TODOSSANTO::2 TODOS SANTOS AVE EL CASTILLO RD 420' W/O CAMINO CORTEZ 202 36 7272 Residential Asphalt 70 11/6/2023 COACH::TODOSSANTO::3 TODOS SANTOS AVE 420' W/O CAMINO CORTEZ CAMINO CORTEZ 418 36 15048 Residential Asphalt 75 11/6/2023 COACH::TODOSSANTO::4 TODOS SANTOS AVE CAMINO CORTEZ COZUMEL ST 815 36 29340 Residential Asphalt 68 11/6/2023 COACH::TOMASLN::2 TOMAS LN CHRISTINA RD PEDRO DR 453 36 16308 Residential Asphalt 81 11/6/2023 COACH::TOPAZCT::1 TOPAZ CT CDS W SIENNA CIR 110 37 4070 Residential Asphalt 71 11/6/2023 COACH::TORINOPL::1 TORINO PLACE SIENO LN MONZA LANE 508 36 18288 Residential Asphalt 100 11/6/2023 COACH::TRIPOLIWAY::1 TRIPOLI WAY VALLEY RD 52ND AVE 1305 36 46980 Residential Surface Treatment 75 11/6/2023 COACH::TRIPOLIWAY::10 TRIPOLI WAY ALLEY BAGDAD AVE 199 36 7164 Residential Surface Treatment 81 11/6/2023 COACH::TRIPOLIWAY::11 TRIPOLI WAY BAGDAD AVE 7TH ST 351 36 12636 Collector Asphalt 63 11/6/2023 COACH::TRIPOLIWAY::12 TRIPOLI WAY 7TH ST 6TH ST 325 36 11700 Collector Asphalt 60 11/6/2023 COACH::TRIPOLIWAY::2 TRIPOLI WAY 52ND AVE ARABY AVE 300 36 10800 Residential Asphalt 66 11/6/2023 COACH::TRIPOLIWAY::3 TRIPOLI WAY ARABY AVE ALLEY 240 36 8640 Residential Surface Treatment 64 11/6/2023 COACH::TRIPOLIWAY::4 TRIPOLI WAY ALLEY CAIRO AVE 30 36 1080 Residential Surface Treatment 76 11/6/2023 COACH::TRIPOLIWAY::5 TRIPOLI WAY CAIRO AVE CAIRO AVE 120 36 4320 Residential Surface Treatment 82 11/6/2023 COACH::TRIPOLIWAY::6 TRIPOLI WAY CAIRO AVE MEDINA AVE 150 36 5400 Residential Surface Treatment 75 11/6/2023 COACH::TRIPOLIWAY::7 TRIPOLI WAY MEDINA AVE DAMASCUS AVE 142 36 5112 Residential Surface Treatment 80 11/6/2023 COACH::TRIPOLIWAY::8 TRIPOLI WAY DAMASCUS AVE DAMASCUS AVE 128 36 4608 Residential Surface Treatment 60 11/6/2023 COACH::TRIPOLIWAY::9 TRIPOLI WAY DAMASCUS AVE 70' N/O DAMASCUS AVE 71 36 2556 Residential Surface Treatment 72 11/6/2023 COACH::TULIPANST::1 TULIPAN ST CALENDULA AVE ROSAL AVE 774 36 27864 Residential Asphalt 38 11/6/2023 COACH::TYLERLN::1 TYLER LN TYLER ST CDS 947 36 34092 Collector Asphalt 72 11/6/2023 COACH::TYLERST::1 TYLER ST CITY LIMITS 54TH AVE 1334 50 66700 Collector Asphalt 97 11/6/2023 COACH::TYLERST::11 TYLER ST LAS FLORES AVE CALLE PIZANO 274 40 10960 Collector Asphalt 31 11/6/2023 COACH::TYLERST::13 TYLER ST CALLE PIZANO CALLE MENDOZA 686 40 27440 Collector Asphalt 36 11/6/2023 COACH::TYLERST::15 TYLER ST CALLE MENDOZA 50TH AVE 1883 40 75320 Collector Asphalt 22 11/6/2023 COACH::TYLERST::16 TYLER ST 50TH AVE 50TH AVE 786 30 23580 Rural Asphalt 52 11/6/2023 COACH::TYLERST::17 TYLER ST 50TH AVE 4540' N/O 50TH AVE 4535 30 136050 Rural Asphalt 33 11/6/2023 COACH::TYLERST::18 TYLER ST 4785' S/O VISTA DEL SUR 3485' S/O VISTA DEL SUR 1299 30 38970 Rural Asphalt 100 11/6/2023 COACH::TYLERST::19 TYLER ST 3485' S/O VISTA DEL SUR 2125' S/O VISTA DEL SUR 1358 30 40740 Rural Asphalt 95 11/6/2023 COACH::TYLERST::2 TYLER ST 54TH AVE TYLER LN 1021 50 51050 Collector Asphalt 66 11/6/2023 COACH::TYLERST::20 TYLER ST 2125' S/O VISTA DEL SUR VISTA DEL SUR 2126 30 63780 Rural Asphalt 96 11/6/2023 COACH::TYLERST::3 TYLER ST TYLER LN 1640' N/O TYLER LN 1637 50 81850 Collector Asphalt 64 11/6/2023 COACH::TYLERST::4 TYLER ST 1615' S/O SH-111 SH-111 1614 50 80700 Collector Asphalt 60 11/6/2023 COACH::TYLERST::5 TYLER ST 52ND AVE 410' S/O CARDINAL DR 1316 40 52640 Collector Asphalt 44 11/6/2023 COACH::TYLERST::6 TYLER ST 410' S/O CARDINAL DR CARDINAL DR 410 40 16400 Collector Asphalt 32 11/6/2023 COACH::TYLERST::7 TYLER ST CARDINAL DR CALLE BOUGANVILIA 921 40 36840 Collector Asphalt 38 11/6/2023 COACH::TYLERST::9 TYLER ST CALLE BOUGANVILA LAS FLORES AVE 270 40 10800 Collector Asphalt 19 11/6/2023 COACH::VALENCIALN::1 VALENCIA LN CDS CYPRESS ST 245 36 8820 Residential Surface Treatment 57 11/6/2023 COACH::VALENCIALN::2 VALENCIA LN CYPRESS ST SHADY LN 265 36 9540 Residential Surface Treatment 48 11/6/2023 COACH::VALLEPOSAD::1 VALLE POSADA MOONLIT DR FIESTA RD 403 36 14508 Residential Asphalt 51 11/6/2023 COACH::VALLEYRD::1 VALLEY RD SH-86 JENNIFER WAY 396 40 15840 Collector Surface Treatment 61 11/6/2023 COACH::VALLEYRD::10 VALLEY RD SHADY LN SHADY LN 160 40 6400 Collector Surface Treatment 67 11/6/2023 COACH::VALLEYRD::2 VALLEY RD JENNIFER WAY TRIPOLI WAY 260 40 10400 Collector Surface Treatment 58 11/6/2023 COACH::VALLEYRD::3 VALLEY RD TRIPOLI WAY MORGAN AVE 268 40 10720 Collector Surface Treatment 53 11/6/2023 COACH::VALLEYRD::4 VALLEY RD MORGAN AVE NELSON ST 276 40 11040 Collector Surface Treatment 72 11/6/2023 COACH::VALLEYRD::5 VALLEY RD NELSON ST LAS PALMAS ST 268 40 10720 Collector Surface Treatment 67 11/6/2023 COACH::VALLEYRD::6 VALLEY RD LAS PALMAS ST OASIS PALM AVE 260 40 10400 Collector Asphalt 80 11/6/2023 COACH::VALLEYRD::7 VALLEY RD OASIS PALM AVE DOS PALMAS AVE 260 40 10400 Collector Surface Treatment 70 11/6/2023 COACH::VALLEYRD::8 VALLEY RD DOS PALMAS AVE CYPRESS ST 260 40 10400 Collector Surface Treatment 77 11/6/2023 COACH::VALLEYRD::9 VALLEY RD CYPRESS ST SHADY LN 260 40 10400 Collector Surface Treatment 70 11/6/2023 COACH::VANBURENST::1 VAN BUREN ST AIRPORT BLVD 55TH AVE 2644 20 52880 Collector Asphalt 76 11/6/2023 COACH::VANBURENST::10 VAN BUREN ST VIA VALENCIA 50TH AVE 695 48 33360 Collector Asphalt 38 11/6/2023 COACH::VANBURENST::11 VAN BUREN ST 50TH AVE MOONLIT DR 1580 76 120080 Collector Asphalt 38 11/6/2023 COACH::VANBURENST::12 VAN BUREN ST MOONLIT DR FIESTA RD 448 76 34048 Collector Asphalt 54 11/6/2023 COACH::VANBURENST::13 VAN BUREN ST FIESTA RD 49TH AVE 698 76 53048 Collector Asphalt 16 11/6/2023 COACH::VANBURENST::14 VAN BUREN ST 49TH AVE ED MITCHELL DR 1298 35 45430 Collector Asphalt 32 11/6/2023 COACH::VANBURENST::15 VAN BUREN ST ED MITCHELL DR 48TH AVE 1399 35 48965 Collector Asphalt 33 11/6/2023 COACH::VANBURENST::2 VAN BUREN ST 54TH AVE 2630' N/O 54TH AVE 2630 35 92050 Collector Asphalt 99 11/6/2023 COACH::VANBURENST::4 VAN BUREN ST 2630' N/O 54TH AVE 3290' N/O 54TH AVE 649 35 22715 Collector Asphalt 100 11/6/2023 COACH::VANBURENST::5 VAN BUREN ST 3290' N/O 54TH AVE 52ND AVE 1940 35 67900 Collector Asphalt 99 11/6/2023 COACH::VANBURENST::6 VAN BUREN ST 52ND AVE MANHATTAN AVE 1979 72 142488 Collector Asphalt 72 11/6/2023 COACH::VANBURENST::7 VAN BUREN ST MANHATTAN AVE 51ST AVE 694 72 49968 Collector Asphalt 32 11/6/2023 COACH::VANBURENST::8 VAN BUREN ST 51ST AVE VIA MERIDA 1307 48 62736 Collector Asphalt 40 11/6/2023 COACH::VANBURENST::9 VAN BUREN ST VIA MERIDA VIA VALENCIA 634 48 30432 Collector Asphalt 28 11/6/2023 COACH::VENENTABLD::1 VENENTA BLVD CAPITOLA AVE PISMO CT 261 36 9396 Residential Asphalt 55 11/6/2023 COACH::VENENTABLD::2 VENENTA BLVD PISMO CT HUNTINGTON AVE 261 36 9396 Residential Asphalt 59 11/6/2023 COACH::VENICELN::1 VENICE LN HUNTINGTON AVE CDS 232 36 8352 Residential Asphalt 79 11/6/2023 COACH::VERACRUZ::1 VERA CRUZ CDS PAVON PALMA 208 40 8320 Residential Asphalt 87 11/6/2023 COACH::VERACRUZ::2 VERA CRUZ PAVON PALMA AVENIDA CORTEZ 166 40 6640 Residential Asphalt 100 11/6/2023 COACH::VERMOUTHDR::1 VERMOUTH DR D/E PRIMITIVO DR 190 32 6080 Residential Asphalt 51 11/6/2023 COACH::VERMOUTHDR::2 VERMOUTH DR PRIMITIVO DR ALLENDE DR 866 32 27712 Residential Asphalt 36 11/6/2023 COACH::VIACONCHIL::1 VIA CONCHILLA AVENIDA DE PLATA AVENIDA DE PLATINA 265 40 10600 Residential Asphalt 51 11/6/2023 COACH::VIADURANGO::1 VIA DURANGO CDS AVENIDA CORTEZ 375 40 15000 Residential Asphalt 100 11/6/2023 COACH::VIAESTANCN::1 VIA ESTANCIA AVENIDA CAMPANAS 50TH AVE 180 18 3240 Residential Asphalt 99 11/6/2023 COACH::VIAESTANCS::1 VIA ESTANCIA AVENIDA CAMPANAS 50TH AVE 180 18 3240 Residential Asphalt 100 11/6/2023 COACH::VIAHERMOSA::1 VIA HERMOSA CDS AVENIDA CORTEZ 376 40 15040 Residential Asphalt 100 11/6/2023 COACH::VIAMERIDA::1 VIA MERIDA VAN BUREN ST PASEO BARCELONA 202 36 7272 Residential Surface Treatment 55 11/6/2023 COACH::VIAMISIONE::1 VIA MISIONERO CALLE SOLEDAD SHADY LN 659 36 23724 Residential Asphalt 72 11/6/2023 COACH::VIAPICON::1 VIA PICON CALHOUN ST CALLE FRONTERA 199 20 3990 Residential Asphalt 97 11/6/2023 COACH::VIAPICON::2 VIA PICON CALHOUN ST CALLE FRONTERA 201 20 4023 Residential Asphalt 97 11/6/2023 COACH::VIASANTIAG::1 VIA SANTIAGO CDS CALLE DIEGO 71 36 2556 Residential Asphalt 68 11/6/2023 COACH::VIATEPEYAC::1 VIA TEPEYAC CALLE SOLEDAD TEPEYAC CT 426 36 15336 Residential Asphalt 68 11/6/2023 COACH::VIATEPEYAC::2 VIA TEPEYAC TEPEYAC CT SHADY LN 288 36 10368 Residential Asphalt 74 11/6/2023 COACH::VIAVALENCI::1 VIA VALENCIA VAN BUREN ST PASEO MADRID 202 33 6666 Residential Surface Treatment 62 11/6/2023 COACH::VIAVALENCI::2 VIA VALENCIA PASEO MADRID CALLE MARBELLA 153 33 5049 Residential Surface Treatment 85 11/6/2023 COACH::VIAVALENCI::3 VIA VALENCIA CALLE MARBELLA PASEO CORDOVA 147 33 4851 Residential Surface Treatment 97 11/6/2023 COACH::VIAZAHIDI::1 VIA ZAHIDI AVENIDA RAZON AVENIDA ADOBE 1026 40 41040 Residential Asphalt 65 11/6/2023 COACH::VINEAVE::1 VINE AVE 9TH ST 8TH ST 375 52 19500 Collector Asphalt 28 11/6/2023 COACH::VINEAVE::10 VINE AVE ALLEY 1ST ST 188 52 9776 Collector Asphalt 58 11/6/2023 COACH::VINEAVE::2 VINE AVE 8TH ST 7TH ST 375 52 19500 Collector Asphalt 42 11/6/2023 COACH::VINEAVE::3 VINE AVE 7TH ST 6TH ST 325 52 16900 Collector Asphalt 27 11/6/2023 COACH::VINEAVE::4 VINE AVE 6TH ST 5TH ST 325 52 16900 Collector Asphalt 39 11/6/2023 COACH::VINEAVE::5 VINE AVE 5TH ST 4TH ST 325 52 16900 Collector Asphalt 32 11/6/2023 COACH::VINEAVE::6 VINE AVE 4TH ST 3RD ST 325 52 16900 Collector Asphalt 48 11/6/2023 COACH::VINEAVE::7 VINE AVE 3RD ST ALLEY 188 52 9776 Collector Asphalt 44 11/6/2023 A10
Item 21.
Asset Id Name Start Location End Location Length Width Area Functional Classification Pavement Type Last Inspection PCI Last Inspection Date COACH::VINEAVE::8 VINE AVE ALLEY 2ND ST 188 52 9776 Collector Asphalt 50 11/6/2023 COACH::VINEAVE::9 VINE AVE 2ND ST ALLEY 188 52 9776 Collector Asphalt 28 11/6/2023 COACH::VINETALN::1 VINETA LN CDS GENOA ST 353 30 10590 Residential Asphalt 65 11/6/2023 COACH::VISTADELNO::1 VISTA DEL NORTE HARRISON ST CITY LIMITS 2650 30 79500 Collector Asphalt 97 11/6/2023 COACH::VISTADELNO::2 VISTA DEL NORTE 760' W/O DILLON RD DILLON RD 756 60 45360 Collector Asphalt 41 11/6/2023 COACH::VISTADELNO::3 VISTA DEL NORTE DILLON RD 1630' E/O DILLON RD 1624 40 64960 Collector Asphalt 33 11/6/2023 COACH::VISTADELNO::4 VISTA DEL NORTE 1630' E/O DILLON RD TYLER ST 615 40 24600 Collector Asphalt 45 11/6/2023 COACH::VISTADELNO::5 VISTA DEL NORTE TYLER ST 980' E/O TYLER AVE 977 40 39080 Collector Asphalt 35 11/6/2023 COACH::VISTADELNO::6 VISTA DEL NORTE 980' E/O TYLER AVE 1580' E/O TYLER AVE 592 40 23680 Collector Asphalt 46 11/6/2023 COACH::VISTADELNO::7 VISTA DEL NORTE 1580' E/O TYLER AVE CITY LIMITS 1156 40 46240 Collector Asphalt 48 11/6/2023 COACH::VISTADELSU::1 VISTA DEL SUR DILLON RD CAMP CT 1084 40 43360 Collector Asphalt 47 11/6/2023 COACH::VISTADELSU::2 VISTA DEL SUR CAMP CT TYLER ST 2043 40 81720 Collector Asphalt 36 11/6/2023 COACH::VISTADELSU::3 VISTA DEL SUR TYLER ST CITY LIMITS 2805 40 112200 Collector Asphalt 29 11/6/2023 COACH::WSIENNACIR::1 W SIENNA CIR TOPAZ CT N SIENNA CIR 910 36 32760 Residential Asphalt 63 11/6/2023 COACH::WSIENNACIR::2 W SIENNA CIR TOPAZ CT 100' W/O SLATE DR 189 36 6804 Residential Asphalt 73 11/6/2023 COACH::WSIENNACIR::3 W SIENNA CIR 100' W/O SLATE DR SLATE DR 100 36 3600 Residential Asphalt 75 11/6/2023 COACH::WASHINGTON::1 WASHINGTONIA AVE 50TH AVE ROYAL CT 225 36 8100 Residential Asphalt 55 11/6/2023 COACH::WASHINGTON::2 WASHINGTONIA AVE ROYAL CT KING CT 254 36 9144 Residential Asphalt 51 11/6/2023 COACH::WASHINGTON::3 WASHINGTONIA AVE KING CT QUEEN CT 254 36 9144 Residential Asphalt 49 11/6/2023 COACH::WASHINGTON::4 WASHINGTONIA AVE QUEEN CT RHAPIS CT 254 36 9144 Residential Asphalt 46 11/6/2023 COACH::WASHINGTON::5 WASHINGTONIA AVE RHAPIS CT PHOENIX AVE 254 36 9144 Residential Asphalt 62 11/6/2023 COACH::WESTERFILD::1 WESTERFIELD WAY AVENIDA ADOBE 140' W/O S BALBOA ST 130 40 5200 Residential Asphalt 35 11/6/2023 COACH::WESTERFILD::2 WESTERFIELD WAY 140' W/O S BALBOA ST S BALBOA ST 137 40 5480 Residential Asphalt 44 11/6/2023 COACH::WESTERFILD::3 WESTERFIELD WAY S BALBOA ST 140' E/O S CORONADO ST 137 40 5480 Residential Asphalt 41 11/6/2023 COACH::WESTERFILD::4 WESTERFIELD WAY 140' E/O S CORONADO ST S CORONADO ST 137 40 5480 Residential Asphalt 61 11/6/2023 COACH::WESTERFILD::5 WESTERFIELD WAY S CORONADO ST 140' E/O S CORONADO ST 137 40 5480 Residential Asphalt 47 11/6/2023 COACH::WESTERFILD::6 WESTERFIELD WAY 140' E/O S CORONADO ST S KENMORE ST 137 40 5480 Residential Asphalt 53 11/6/2023 COACH::WESTERFILD::7 WESTERFIELD WAY S KENMORE ST SUNCREST ST 135 40 5400 Residential Asphalt 51 11/6/2023 COACH::WESTERFILD::8 WESTERFIELD WAY SUNCREST ST SH-86 510 40 20400 Residential Asphalt 39 11/6/2023 COACH::ZUMADR::1 ZUMA DR LA JOLLA AVE 51ST AVE 178 36 6408 Residential Asphalt 64 11/6/2023 A11
Item 21.
APPENDIX B:
WORK PLAN FOR SCENARIO 1:
UNLIMITED BUDGET
Item 21.
Asset Id Name Start Location End Location
Functional
Classification Area Treatment Name Maintenance Date
PCI Before
Treatment
PCI After Treatment Treatment Cost
COACH::FILLMOREST::3 FILLMORE ST 1750' S/O 54TH AVE 54TH AVE Rural 41,736.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 1.5 100 834,720.0 $ COACH::DILLONRD::13 DILLON RD VISTA DEL NORTE DILLON RD Arterial 280,416.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 3 100 5,608,320.0 $ COACH::52NDAVEE::36 52ND AVE ENTERPRISE WAY HERNANDEZ ST Arterial 28,530.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 4.5 100 570,600.0 $ COACH::50THAVE::4 50TH AVE TYLER ST 660' W/O TYLER ST Arterial 26,320.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 6 100 526,400.0 $ COACH::FILLMOREST::5 FILLMORE ST 52ND AVE 2650' N/O 52ND AVE Rural 63,576.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 7.5 100 1,271,520.0 $ COACH::ENTERPRISE::3 ENTERPRISE WAY INDUSTRIAL WAY 52ND AVE Collector 58,995.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 10.5 100 1,179,900.0 $ COACH::50THAVE::5 50TH AVE 940' E/O TYLER ST TYLER ST Rural 28,020.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 10.5 100 560,400.0 $ COACH::52NDAVEE::35 52ND AVE LA PONDEROSA DR ENTERPRISE WAY Arterial 18,810.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 10.5 100 376,200.0 $ COACH::AADOBE::1 AVENIDA ADOBE 51ST AVE CALLE CATHRON Residential 6,960.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 10.5 100 139,200.0 $ COACH::CESARCHAVE::3 CESAR CHAVEZ ST CALLE ROJO 52ND AVE Collector 22,459.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 12 100 449,180.0 $ COACH::POLKST::4 POLK ST 52ND AVE 2160' N/O 52ND AVE Rural 65,040.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 13.5 100 1,300,800.0 $ COACH::52NDAVEW::2 52ND AVE ENTERPRISE WAY LA PONDEROSA DR Arterial 18,810.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 13.5 100 376,200.0 $ COACH::ALLENDEDR::4 ALLENDE DR ALLENDE DR VERMOUTH DR Residential 3,168.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 13.5 100 63,360.0 $ COACH::VANBURENST::13 VAN BUREN ST FIESTA RD 49TH AVE Collector 53,048.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 15 100 1,060,960.0 $ COACH::54THAVE::11 54TH AVE FILLMORE ST 2645' E/O FILLMORE ST Rural 52,920.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 15 100 1,058,400.0 $ COACH::CALENDULA::3 CALENDULA AVE JAZMIN ST TULIPAN ST Residential 9,583.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 15 100 191,660.0 $ COACH::PALMERASCR::4 PALMERAS CIR CHUPAROSA DR CARDELINA DR Residential 7,200.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 15 100 144,000.0 $ COACH::50THAVE::8 50TH AVE POLK ST FILLMORE ST Rural 138,060.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 16.5 100 2,761,200.0 $ COACH::FILLMOREST::6 FILLMORE ST 2650' S/O 50TH AVE 50TH AVE Rural 63,120.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 16.5 100 1,262,400.0 $ COACH::50THAVEE::1 50TH AVE CITY LIMITS COLONIA DR Arterial 33,690.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 16.5 100 673,800.0 $ COACH::OATESLN::2 OATES LN OATES LN CITY LIMITS Collector 33,660.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 16.5 100 673,200.0 $ COACH::50THAVEE::10 50TH AVE FREDERICK ST PAVON PALMA Arterial 12,375.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 16.5 100 247,500.0 $ COACH::PALMERASCR::10 PALMERAS CIR PALOMA DR MARIPOSA DR Residential 7,200.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 16.5 100 144,000.0 $ COACH::PALMERASCR::12 PALMERAS CIR CARDINAL DR PALMERAS CIR Residential 5,976.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 16.5 100 119,520.0 $ COACH::52NDAVE::42 52ND AVE FILLMORE ST 5300' E/O FILLMORE ST Rural 79,530.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 18 100 1,590,600.0 $ COACH::TYLERST::9 TYLER ST CALLE BOUGANVILA LAS FLORES AVE Collector 10,800.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 18 100 216,000.0 $ COACH::HILLDR::3 HILL DR SUNSET DR 240' W/O SH-111 Residential 5,640.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 18 100 112,800.0 $ COACH::50THAVE::3 50TH AVE 660' W/O TYLER ST 1660' W/O TYLER ST Arterial 40,000.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 19.5 100 800,000.0 $ COACH::51STAVE::3 51ST AVE ZUMA DR CHIAPAS DR Collector 33,558.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 19.5 100 671,160.0 $ COACH::52NDAVEW::1 52ND AVE HERNANDEZ ST ENTERPRISE WAY Arterial 28,395.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 19.5 100 567,900.0 $ COACH::54THAVE::12 54TH AVE 2645' E/O FILLMORE ST CITY LIMITS Rural 26,820.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 19.5 100 536,400.0 $ COACH::TYLERST::15 TYLER ST CALLE MENDOZA 50TH AVE Collector 75,320.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 21 100 1,506,400.0 $ COACH::50THAVEW::14 50TH AVE WASHINGTONIA AVE VAN BUREN ST Arterial 49,323.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 21 100 986,460.0 $ COACH::52NDAVEW::21 52ND AVE FREDERICK ST PRIMITIVO DR Arterial 38,580.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 21 100 771,600.0 $ COACH::49THAVE::5 49TH AVE LAS CRUCES ST SH-111 Collector 26,796.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 21 100 535,920.0 $ COACH::PALMERASCR::1 PALMERAS CIR PALOMA DR CARDINAL DR Residential 16,560.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 21 100 331,200.0 $ COACH::DILLONRDS::1 DILLON RD 44TH AVE DILLON RD Arterial 49,830.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 22.5 100 996,600.0 $ COACH::FREDERICK::16 FREDERICK ST PASEO LAREDO PHOENIX AVE Collector 30,822.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 22.5 100 616,440.0 $ COACH::MECCALANE::1 MECCA LANE BAGDAD AVE 670' N/O BAGDAD AVE Residential 25,460.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 22.5 100 509,200.0 $ COACH::50THAVEE::2 50TH AVE COLONIA DR CALHOUN ST Arterial 15,630.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 22.5 100 312,600.0 $ COACH::HIBISCOST::3 HIBISCO ST IRIS AVE AMAPOLA LN Residential 9,842.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 22.5 100 196,840.0 $ COACH::HIBISCOST::5 HIBISCO ST ROSAL AVE MARGARITA AVE Residential 9,398.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 22.5 100 187,960.0 $ COACH::GENOAST::3 GENOA ST AVENIDA ALEENAH 150' N/O AVENIDA ALEENAH Residential 5,291.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 22.5 100 105,820.0 $ COACH::53RDAVE::11 53RD AVE SH-86 CALLE BONITA Collector 38,580.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 24 100 771,600.0 $ COACH::BAGDADAVE::4 BAGDAD AVE CALLE AVILA CALLE CAMACHO Residential 12,520.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 24 100 250,400.0 $ COACH::HIBISCOST::2 HIBISCO ST CALENDULA AVE IRIS AVE Residential 9,472.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 24 100 189,440.0 $ COACH::JAZMINST::2 JAZMIN ST MARGARITA AVE 49TH AVE Residential 6,549.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 24 100 130,980.0 $ COACH::ARAYLYNN::3 AVENIDA RAYLYNN CALLE FLORENA 150' E/O CALLE FLORENA Residential 5,184.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 24 100 103,680.0 $ COACH::FREDERICK::14 FREDERICK ST 50TH AVE AVENIDA VESTAGO Collector 35,442.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 25.5 100 708,840.0 $ COACH::4THST::3 4TH ST ORCHARD AVE VINE AVE Collector 23,800.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 25.5 100 476,000.0 $ COACH::FREDERICK::15 FREDERICK ST AVENIDA VESTAGO PASEO LAREDO Collector 22,902.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 25.5 100 458,040.0 $ COACH::VINEAVE::3 VINE AVE 7TH ST 6TH ST Collector 16,900.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 25.5 100 338,000.0 $ COACH::SHADYLN::10 SHADY LN 53RD AVE STACIE LN Residential 10,808.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 26 100 216,160.0 $ COACH::49THAVE::4 49TH AVE FREDERICK ST LAS CRUCES ST Collector 76,428.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 27 100 1,528,560.0 $ COACH::VANBURENST::9 VAN BUREN ST VIA MERIDA VIA VALENCIA Collector 30,432.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 27 100 608,640.0 $ COACH::VINEAVE::1 VINE AVE 9TH ST 8TH ST Collector 19,500.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 27 100 390,000.0 $ COACH::VINEAVE::9 VINE AVE 2ND ST ALLEY Collector 9,776.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 27 100 195,520.0 $ COACH::CALENDULA::5 CALENDULA AVE ORQUIDEA LN NARCISO LN Residential 9,435.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 27 100 188,700.0 $ COACH::DOUMACT::2 DOUMA CT DOUMA CT CALLE TORRES ORDUNO Residential 6,660.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 27 100 133,200.0 $ COACH::VISTADELSU::3 VISTA DEL SUR TYLER ST CITY LIMITS Collector 112,200.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 2,244,000.0 $ COACH::POLKST::5 POLK ST 2160' N/O 52ND AVE 50TH AVE Rural 57,960.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 1,159,200.0 $ COACH::48THAVEW::2 48TH AVE SH-111 VAN BUREN ST Arterial 44,180.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 883,600.0 $ COACH::52NDAVEE::3 52ND AVE PRIMITIVO DR FREDERICK ST Arterial 38,640.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 772,800.0 $ COACH::50THAVEE::7 50TH AVE WASHINGTONIA AVE CALLE QUINTERRA Arterial 28,905.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 578,100.0 $ COACH::ROSALAVE::1 ROSAL AVE TULIPAN ST HIBISCO ST Residential 28,416.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 568,320.0 $ COACH::PRIMITIVO::3 PRIMITIVO DR PRIMITIVO DR VERMOUTH DR Residential 24,256.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 485,120.0 $ COACH::SHADYLN::17 SHADY LN BAGDAD AVE ORCHARD AVE Collector 23,632.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 472,640.0 $ COACH::SHADYLN::16 SHADY LN ARABY AVE CAIRO AVE Collector 18,144.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 362,880.0 $ COACH::CAPITOLAAV::3 CAPITOLA AVE LAGUNA LN VENENTA BLVD Residential 11,880.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 237,600.0 $ COACH::PRIMITIVO::4 PRIMITIVO DR VERMOUTH DR 52ND AVE Residential 11,616.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 232,320.0 $ COACH::ORCHARDAVE::10 ORCHARD AVE ALLEY 2ND ST Collector 11,280.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 225,600.0 $ COACH::ORCHARDAVE::9 ORCHARD AVE 3RD ST ALLEY Collector 11,280.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 225,600.0 $ COACH::ALLENDEDR::5 ALLENDE DR ALLENDE DR VERMOUTH DR Residential 11,104.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 222,080.0 $ COACH::PARKINGLOT::1 PARKING LOT 200' S/O BAGDAD AVE BAGDAD AVE Residential 6,368.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 127,360.0 $ COACH::GENOAST::5 GENOA ST AVENIDA VERONICA 150' N/O AVENIDA VERONICA Residential 5,476.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 28.5 100 109,520.0 $ COACH::48THAVEE::5 48TH AVE VAN BUREN ST SH-111 Arterial 44,200.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 30 100 884,000.0 $ COACH::54THAVEE::10 54TH AVE POLK ST CITY LIMITS Arterial 22,140.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 30 100 442,800.0 $ COACH::TYLERST::11 TYLER ST LAS FLORES AVE CALLE PIZANO Collector 10,960.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 30 100 219,200.0 $ COACH::COPPERIDGE::3 COPPERIDGE ST SHADOWROCK DR LAPIS DR Residential 10,360.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 30 100 207,200.0 $ COACH::PRIMITIVO::1 PRIMITIVO DR PRIMITIVO DR MALVASIA WAY Residential 8,544.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 30 100 170,880.0 $ COACH::MALVASIA::1 MALVASIA WAY PRIMITIVO DR RODREJO WAY Residential 6,176.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 30 100 123,520.0 $ COACH::53RDAVE::6 53RD AVE 130' W/O CALLE CAMACHO CALLE CAMACHO Collector 4,995.0 Reconstruction - 6" Asphalt + 8" Base 11/6/2024 30 100 99,900.0 $ COACH::SH-111S::1 SH-111 48TH AVE MITCHELL DR Arterial 88,550.0 3" Mill & Overlay 11/6/2024 36 100 796,950.0 $ COACH::DILLONRDN::14 DILLON RD DILLON RD 44TH AVE Arterial 50,358.0 3" Mill & Overlay 11/6/2024 36 100 453,222.0 $ COACH::CAVILA::7 CALLE AVILA 52ND AVE CAIRO AVE Residential 27,120.0 3" Mill & Overlay 11/6/2024 36 100 244,080.0 $ COACH::4THST::4 4TH ST VINE AVE SH-111 Collector 25,312.0 3" Mill & Overlay 11/6/2024 36 100 227,808.0 $ COACH::PALMAVE::1 PALM AVE 7TH ST 6TH ST Collector 19,500.0 3" Mill & Overlay 11/6/2024 36 100 175,500.0 $ COACH::CEMELIA::2 CALLE EMELIA AVENIDA RAYLYNN AVENIDA GRACE Residential 9,288.0 3" Mill & Overlay 11/6/2024 36 100 83,592.0 $ COACH::HIBISCOST::4 HIBISCO ST AMAPOLA LN ROSAL AVE Residential 9,287.0 3" Mill & Overlay 11/6/2024 36 100 83,583.0 $ COACH::IRISAVE::1 IRIS AVE HIBISCO ST FREDERICK ST Residential 6,956.0 3" Mill & Overlay 11/6/2024 36 100 62,604.0 $ COACH::50THAVEW::3 50TH AVE AVENIDA DE PLATINA CORONADO ST Arterial 4,389.0 3" Mill & Overlay 11/6/2024 36 100 39,501.0 $ COACH::VANBURENST::11 VAN BUREN ST 50TH AVE MOONLIT DR Collector 120,080.0 3" Mill & Overlay 11/6/2024 37.5 100 1,080,720.0 $ COACH::INDUSTRIAL::2 INDUSTRIAL WAY ENTERPRISE WAY POLK ST Collector 75,780.0 3" Mill & Overlay 11/6/2024 37.5 100 682,020.0 $ COACH::50THAVEE::6 50TH AVE VAN BUREN ST WASHINGTONIA AVE Arterial 49,323.0 3" Mill & Overlay 11/6/2024 37.5 100 443,907.0 $ COACH::TYLERST::7 TYLER ST CARDINAL DR CALLE BOUGANVILIA Collector 36,840.0 3" Mill & Overlay 11/6/2024 37.5 100 331,560.0 $ COACH::VANBURENST::10 VAN BUREN ST VIA VALENCIA 50TH AVE Collector 33,360.0 3" Mill & Overlay 11/6/2024 37.5 100 300,240.0 $ COACH::54THAVEW::10 54TH AVE SLATE DR VAN BUREN ST Arterial 27,960.0 3" Mill & Overlay 11/6/2024 37.5 100 251,640.0 $ COACH::TULIPANST::1 TULIPAN ST CALENDULA AVE ROSAL AVE Residential 27,864.0 3" Mill & Overlay 11/6/2024 37.5 100 250,776.0 $ COACH::CROJO::1 CALLE ROJO 260' W/O CALLE EMPALME D/E Residential 26,400.0 3" Mill & Overlay 11/6/2024 37.5 100 237,600.0 $ COACH::SHADYLN::19 SHADY LN ORCHARD AVE 9TH ST Collector 25,760.0 3" Mill & Overlay 11/6/2024 37.5 100 231,840.0 $ COACH::3RDST::2 3RD ST PALM AVE ORCHARD AVE Collector 23,800.0 3" Mill & Overlay 11/6/2024 37.5 100 214,200.0 $ COACH::WESTERFILD::8 WESTERFIELD WAY SUNCREST ST SH-86 Residential 20,400.0 3" Mill & Overlay 11/6/2024 37.5 100 183,600.0 $ COACH::ORCHARDAVE::1 ORCHARD AVE 280' W/O SHADY LN SHADY LN Collector 17,040.0 3" Mill & Overlay 11/6/2024 37.5 100 153,360.0 $ COACH::VINEAVE::4 VINE AVE 6TH ST 5TH ST Collector 16,900.0 3" Mill & Overlay 11/6/2024 37.5 100 152,100.0 $ COACH::REDONDONOR::3 REDONDO NORTE CALLE QUINTERRA REDONDO ESTE Residential 15,480.0 3" Mill & Overlay 11/6/2024 37.5 100 139,320.0 $ COACH::50THAVEW::8 50TH AVE AVENIDA DEL PARQUE PAVON PALMA Arterial 13,728.0 3" Mill & Overlay 11/6/2024 37.5 100 123,552.0 $ COACH::JALISCOAVE::6 JALISCO AVE TAXCO WAY FREDERICK ST Residential 7,056.0 3" Mill & Overlay 11/6/2024 37.5 100 63,504.0 $ COACH::53RDAVE::7 53RD AVE CALLE CAMACHO 130' E/O CALLE CAMACHO Collector 4,995.0 3" Mill & Overlay 11/6/2024 37.5 100 44,955.0 $ COACH::JALISCOAVE::2 JALISCO AVE SALTILLO CIR JALISCO AVE Residential 4,592.0 3" Mill & Overlay 11/6/2024 37.5 100 41,328.0 $ COACH::MALVASIA::2 MALVASIA WAY RODREJO WAY MERCADO CIR Residential 4,128.0 3" Mill & Overlay 11/6/2024 37.5 100 37,152.0 $ COACH::CROJO::3 CALLE ROJO 85' W/O CALLE EMPALME 170' W/O CALLE EMPALME Residential 3,520.0 3" Mill & Overlay 11/6/2024 37.5 100 31,680.0 $ COACH::PRIMITIVO::2 PRIMITIVO DR PRIMITIVO DR PRIMITIVO DR Residential 3,104.0 3" Mill & Overlay 11/6/2024 37.5 100 27,936.0 $ COACH::CAIROAVE::5 CAIRO AVE SH-86 ALLEY Residential 9,416.0 3" Mill & Overlay 11/6/2024 38 100 84,744.0 $ COACH::VANBURENST::8 VAN BUREN ST 51ST AVE VIA MERIDA Collector 62,736.0 3" Mill & Overlay 11/6/2024 39 100 564,624.0 $ COACH::FREDERICK::8 FREDERICK ST 1350' S/O 51ST AVE 51ST AVE Collector 58,050.0 3" Mill & Overlay 11/6/2024 39 100 522,450.0 $ COACH::FREDERICK::7 FREDERICK ST 52ND AVE 1330' N/O 52ND AVE Collector 57,018.0 3" Mill & Overlay 11/6/2024 39 100 513,162.0 $ COACH::JAZMINST::1 JAZMIN ST CALENDULA AVE MARGARITA AVE Residential 37,044.0 3" Mill & Overlay 11/6/2024 39 100 333,396.0 $ COACH::AGRACE::3 AVENIDA GRACE 150' E/O CALLE FLORENA CALLE EMELIA Residential 36,792.0 3" Mill & Overlay 11/6/2024 39 100 331,128.0 $ COACH::ADEPLATINA::1 AVENIDA DE PLATINA 50TH AVE VIA CONCHILLA Residential 22,160.0 3" Mill & Overlay 11/6/2024 39 100 199,440.0 $ COACH::OATESLN::1 OATES LN OATES LN PETER RABBIT LN Collector 17,688.0 3" Mill & Overlay 11/6/2024 39 100 159,192.0 $ COACH::CHUPAROSA::1 CHUPAROSA DR PALMERAS CIR PALMERAS CIR Residential 16,488.0 3" Mill & Overlay 11/6/2024 39 100 148,392.0 $ COACH::FIESTARD::3 FIESTA RD VAN BUREN ST SUMMER ST Residential 7,380.0 3" Mill & Overlay 11/6/2024 39 100 66,420.0 $ COACH::SHADOWROCK::1 SHADOWROCK DR CALHOUN ST COPPERIDGE ST Residential 7,067.0 3" Mill & Overlay 11/6/2024 39 100 63,603.0 $ COACH::VISTADELNO::2 VISTA DEL NORTE 760' W/O DILLON RD DILLON RD Collector 45,360.0 3" Mill & Overlay 11/6/2024 40.5 100 408,240.0 $ COACH::SHADOWROCK::2 SHADOWROCK DR COPPERIDGE ST CINNABAR LN Residential 36,593.0 3" Mill & Overlay 11/6/2024 40.5 100 329,337.0 $ COACH::DOUMACT::1 DOUMA CT 52ND AVE DOUMA CT Residential 24,948.0 3" Mill & Overlay 11/6/2024 40.5 100 224,532.0 $ COACH::VINEAVE::2 VINE AVE 8TH ST 7TH ST Collector 19,500.0 3" Mill & Overlay 11/6/2024 40.5 100 175,500.0 $ COACH::MARIPOSADR::1 MARIPOSA DR PALMERAS CIR PALMERAS CIR Residential 16,488.0 3" Mill & Overlay 11/6/2024 40.5 100 148,392.0 $ COACH::AFLORABUND::2 AVENIDA FLORABUNDA CALLE ABELIA CALLE TECOMARIA Residential 15,732.0 3" Mill & Overlay 11/6/2024 40.5 100 141,588.0 $ COACH::ALLENDEDR::3 ALLENDE DR SOLARCE ST ALLENDE DR Residential 15,008.0 3" Mill & Overlay 11/6/2024 40.5 100 135,072.0 $ COACH::MALIBUAVE::1 MALIBU AVE NEWPORT ST OCEANO RD Residential 13,428.0 3" Mill & Overlay 11/6/2024 40.5 100 120,852.0 $ COACH::MALVASIA::3 MALVASIA WAY MERCADO CIR CHARDONNAY CIR Residential 12,704.0 3" Mill & Overlay 11/6/2024 40.5 100 114,336.0 $ COACH::ASHLERCT::1 ASHLER CT COPPERIDGE ST CDS Residential 12,469.0 3" Mill & Overlay 11/6/2024 40.5 100 112,221.0 $ COACH::CTECOMARIA::2 CALLE TECOMARIA AVENIDA EUROPA AVENIDA CEDRUS Residential 10,296.0 3" Mill & Overlay 11/6/2024 40.5 100 92,664.0 $ COACH::NEWPORTST::4 NEWPORT ST CATALINA AVE LA JOLLA AVE Residential 9,432.0 3" Mill & Overlay 11/6/2024 40.5 100 84,888.0 $ COACH::OCEANORD::1 OCEANO RD CAPITOLA AVE MALIBU AVE Residential 9,288.0 3" Mill & Overlay 11/6/2024 40.5 100 83,592.0 $ COACH::ALLENDEDR::1 ALLENDE DR D/E PROSECCO WAY Residential 8,032.0 3" Mill & Overlay 11/6/2024 40.5 100 72,288.0 $ COACH::WESTERFILD::3 WESTERFIELD WAY S BALBOA ST 140' E/O S CORONADO ST Residential 5,480.0 3" Mill & Overlay 11/6/2024 40.5 100 49,320.0 $ COACH::CROJO::4 CALLE ROJO 85' W/O CALLE EMPALME CALLE EMPALME Residential 3,400.0 3" Mill & Overlay 11/6/2024 40.5 100 30,600.0 $ COACH::50THAVE::2 50TH AVE PETER RABBIT LN 1660' W/O TYLER ST Arterial 42,480.0 3" Mill & Overlay 11/6/2024 42 100 382,320.0 $ COACH::GUITRONST::2 GUITRON ST REYES ST NIETO ST Residential 33,898.0 3" Mill & Overlay 11/6/2024 42 100 305,082.0 $ COACH::FREDERICK::4 FREDERICK ST 53RD AVE CALLE GREGORIO Collector 25,890.0 3" Mill & Overlay 11/6/2024 42 100 233,010.0 $ COACH::5THST::3 5TH ST VINE AVE SH-111 Collector 25,368.0 3" Mill & Overlay 11/6/2024 42 100 228,312.0 $ B1