Cities Index.
Agenda packet

Coachella City Council
August 26, 2026

Document
Agenda packet
Meeting
August 26, 2026
Body
Coachella City Council
Pages
464
Original file
93.1 MB
Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

Item 11.

Indigo Banjo, EIT
system. Ms. Banjo has been providing support with the engineering services during construction portion of this project. She has assisted in structural observations and start-up and commissioning activities.

California Water Service Company Palos Verdes (PV) Station 15 Rebuild Project – Rolling Hills Estates, CA (Design)
Water Works Engineers was contracted by California Water Service to provide preliminary and final engineering design services to rebuild booster pump station PV 15. This includes the replacement of four vertical turbine booster pumps, the addition of a new vertical turbine booster pumps, two surge tank replacements, and the replacement and redesign of existing pressure reducing and pressure relief control valves. Ms. Banjo is supporting the design by assisting in preliminary layouts, cost estimates and developing project specifications.

California Water Service Dominguez Well 300 (DOM 300) Engineering Services During Construction – Compton, CA (Construction)
Water Works Engineers was contracted by California Water Service to provide chloramination and pyrolusite filtration to a water well that would supplement the Dominguez District water system. Ms.

Banjo has been providing support with the engineering services during construction of this project. She has assisted in field observations, start-up and commission activities and post construction mark-ups.

California Water Service Company - Per-and Polyfluoroalkyl Substances (PFAS) Program Engineering Assistance: RFP Development and Bidding Assistance– Various Locations, CA (Owner’s Agent) Water Works Engineers was contracted to provide engineering assistance as Owner’s Agent for California’s Water Service’s PFAs Program across four districts in California. This project involves the design-build of 46 existing sites requiring PFAS treatment. Ms. Banjo supported the program through project coordination, submittal reviews, and CEQA permitting support services.

Washington Water Service – PFAS Program Engineering Assistance: RFP Development and Bidding Assistance – Various Locations, WA (Owner’s Agent)
Water Works Engineers was contracted to provide engineering assistance as Owner’s Agent for Washington Water Service’s PFAs Program in Western Washington. This project involves the design-build of 18 existing groundwater systems for PFAS treatment. Ms. Banjo assisted in development process flow diagrams for each site, NEPA environmental coordination and general project management.

Casitas Municipal Water District – Ventura County/Santa Barbara County Water Intertie – Santa Barbara, CA (Design)
Water Works Engineers was contracted by Casitas Municipal Water District to construct a bidirectional pipeline between Ventura and Santa Barbara counties. Ms. Banjo has been providing support for this project by performing submittal reviews sent by the construction contractor by cross-referencing the equipment specs with WWE’s Bid Ready Specifications and WWE’s Bid Ready Design Drawings.

Page 341 ends

Item 11.

Darin Begay, EIT
Representative Project Experience
Surprise Special Planning Area (SPA) 2 Water Reclamation Facility (WRF), Surprise, AZ (Mechanical Engineer)
The City of Surprise assumed operation and maintenance of the SPA 2 WRF, a Developer Plant that has previously been privately operated and maintained. WaterWorks was retained to identify any repairs or rehabilitation needed before the City takes over the plant. Mr. Begay acted as Mechanical Engineer to provide condition assessments, mechanical assessments, and HVAC assessments of the facility structures.

Surprise Special Planning Area (SPA) 3 Water Reclamation Facility (WRF), Surprise, AZ (Mechanical Engineer)
The City of Surprise assumed operation and maintenance of the SPA 3 WRF, a Developer Plant that has previously been privately operated and maintained. WaterWorks was retained to identify any repairs or rehabilitation needed before the City takes over the plant. Mr. Begay acted as Mechanical Engineer to provide condition assessments, mechanical assessments, and HVAC assessments of the facility structures.

West Deer Valley Water Group BPS and Reservoir, Surprise, AZ (Mechanical Engineer) Mr. Begay was the Mechanical Engineer for this project which included the conceptual, detailed design and permitting of a regional booster pump station and reservoir site in west Surprise. The booster pump station consisted of vertical turbine pumps phased for an ultimate build-out of 19,600 gpm split between two pressure zones. Site planning and design was completed for an ultimate storage of (4) 2MG above grade steel water reservoirs.

As-Needed Engineering Support Services, City of Scottsdale, AZ (Mechanical Engineer) Mr. Begay acted as mechanical engineer in support of the As-Needed Engineering Support Services at various sites and facilities including the evaluation of three onsite chlorine generation systems and assisting the city in selecting the preferred unit as well as developing construction documents, acquiring MCESD permits and supervising the construction phase; developing a control strategy and designing the instrumentation needed to provide the required CT value; providing planning for a 3 mgd Reverse Osmosis facility and associated pH adjustment chemical feed systems, site planning and coordination with various departments; and designing a 4 mgd Granular Activated Carbon Facility that uses chlorine for disinfection – the design of the GAC and chlorination systems were performed within 6 months.

Rancho Mercado Water Facility, City of Surprise, AZ (Mechanical Engineer) WaterWorks was retained by the City of Surprise to design the Rancho Mercado Water Facility that supplies potable water to the Rancho Mercado Water System within the City’s SPA2 Pressure Zone 2C master planned area. Groundwater is supplied to the water facility via an onsite well (Well E1). The planned centralized water production facility was designed to include water treatment, water storage tanks, booster pump stations, and other ancillary equipment required to supply potable water to the surrounding development. It was determined that the best course of treatment of the groundwater in this area was a 6,000 gpm adsorption system for arsenic removal without pH adjustment. The treatment site included the design of adsorption vessels, backwash tanks, dewatering bins, sludge and recycle pump stations, and chemical storage and feed facilities. Mr. Begay provided mechanical engineering services.

Education
B.S. - Mechanical Engineering,
Arizona State University (2008)
Years of Experience
15 years with the firm/
18 years total
Registration
EIT
Darin Begay, EIT
Mechanical Engineer

Page 342 ends

Item 11.

Darin Begay, EIT
Desert Oasis Arsenic Treatment Facility, Surprise, AZ (Mechanical Engineer) The City of Surprise partnered with the SPA2 Water Group developers, including Altamira, Asante, Sunrise Range, and Verdugo, to develop a permanent arsenic treatment system (ATS) to replace a temporary system built around 2006. WaterWorks was retained to design the ATS to treat groundwater from Desert Oasis Well No.1 and 2 and four future well sites through the use of coagulation-filtration pressure filters. Treated water will be stored onsite within two existing potable water reservoirs. Additionally, additional pumping capacity will be added to the existing booster pump station to pump potable water from the reservoirs to the distribution system. The centralized ATS design also included chemical storage and handling facilities and solids handing facilities – including a backwash tank, sludge and decant pumps, and a dewatering roll off bin. Mr. Begay acted as the Mechanical Engineer for this project.

Arizona Public Service (APS) Reverse Osmosis (RO) Replacement, Tonopah, AZ (Mechanical Engineer) The Reverse Osmosis sub-system was nearing the end of its life with aging membrane vessels and outdated membrane technology. This project updated the system with new membranes and associated equipment including pumps, pre-treatments, and a control system. Development of the conceptual design included pre-treatment and reverse osmosis units and chemical feed systems to address operability, redundancy, maintenance, and constructability as well as produce an equipment procurement specification. As Mechanical Engineer, Mr. Begay assisted in the investigation of the performance of the media filters and if they could be improved through “tighter” gradation media, review the capacity versus the number of RO units with respect to average flow, peak demand, redundancy, and building size and footprint, and to evaluate the system layout while taking into consideration operational accessibility, RO skid size, and constructability.

CWS DOM 272 Well Improvements, Compton, CA (Mechanical Engineer) The Dominguez 272 (DOM 272) Well Improvements Project was implemented by California Water Service (CWS) to bring DOM 272 back online and improve water quality in the Rancho Dominguez system. DOM 272 was constructed in 1993 but has remained offline since 2014 due to several customer complaints of odor and discolored water. Prior to being taken offline, the well produced approximately 800-gpm.

However, the design assumed 1,000-gpm production rate, and the design production rate will be reconsidered after well rehabilitation. The DOM 272 wellsite is a 6,200-square foot, irregularly shaped site in an industrial area.

Mr. Begay acted as Mechanical Engineer in the design of the following:
• Air stripper system for dissolved oxygen augmentation and removal of hydrogen sulfide and methane.
• Granular Activated Carbon (GAC) gas scrubber to treat exhaust from air strippers (hydrogen sulfide removal)
• Booster pumps to boost up to system pressure after aeration system • Breakpoint chlorination vessel for reducing color and odor • Aqueous ammonia chemical system for formation of chloramines • Building, site, and mechanical improvements to support the operation of the DOM 272 wellsite.

As-Needed Engineering Support Services, City of Scottsdale, AZ (Mechanical Engineer) Mr. Begay acted as mechanical engineer in support of the As-Needed Engineering Support Services at various sites and facilities including the evaluation of three onsite chlorine generation systems and assisting the city in selecting the preferred unit as well as developing construction documents, acquiring MCESD permits and supervising the construction phase; developing a control strategy and designing the instrumentation needed to provide the required CT value; providing planning for a 3 mgd Reverse Osmosis facility and associated pH adjustment chemical feed systems, site planning and coordination with various departments; and designing a 4 mgd Granular Activated Carbon Facility that uses chlorine for disinfection – the design of the GAC and chlorination systems were performed within 6 months.

Page 343 ends

Item 11.

Representative Project Experience
Town of Gilbert North Water Treatment Plant Design and Improvements (Senior Electrical Engineer) The Gilbert NWTP is a 60-mgd drinking water plant that treats surface water and groundwater from four different sources. WaterWorks was the Design Engineer that led the team for this project that met an immediate need for improved Disinfection By-Product (DBP) compliance and maximized surface water supplies. The project was challenged by the differing sources of surface water and groundwater with primary sources changing based on the season. Both sources are extreme in their treatability with high turbidity and/or elevated TOC concentrations from one source and low turbidity, poor settleability, and poor filterability found from the other primary source. Water Works has performed water quality evaluations and identified treatability challenges, led the technology selection to replace and repair deficient and failing infrastructure, as well as expanded the treatment capacity from 45 mgd to 60 mgd to facilitate future capacity expansions. As Senior Electrical Engineer, Brian assisted with project meetings and workshops, evaluation of existing facilities, cost evaluation, pre-design, quality control/quality assurance, design-phase project master docs, 60%, 90%, and 100% detailed design, permitting, value engineering and differential design GMPs, and construction administration services.

City of Scottsdale Water Resources Engineering Support Services (Senior Electrical Engineer) The City of Scottsdale (COS) owns and operates a number of surface water, groundwater, wastewater, and advanced reclaimed water treatment facilities. These treatment facilities cover the range of technologies, including Conventional Surface Water Treatment (Coagulation, Sedimentation, Granular Media Filtration), Low Pressure Membrane Filtration (Ultrafiltration/Microfiltration), Cloth Media Filtration, Granular Activated Carbon (GAC) Adsorption, Biological Nitrification/De-Nitrification, Chlorination/Chloramination, Ozonation, Reverse Osmosis, Ultraviolet (UV), Vadose Zone Recharge, Air Stripping, Granular Iron Media Adsorption (Arsenic Removal), and Aquifer Storage and Recovery. Through this contract, Water Works provided process monitoring, technical support, training, and engineering analysis for process optimization. As Senior Electrical Engineer, Brian assisted with system design, construction administration, and specialty inspections.

City of Scottsdale Thomas Groundwater Treatment Facility (Senior Electrical Engineer) Water Works was retained by the City of Scottsdale as the lead consultant team to evaluate alternatives and provide the design of the City of Scottsdale Thomas Groundwater Treatment Facility. The TGTF is a treatment extension of the Central Groundwater Treatment Facility (CGTF) which treats TCE contaminated groundwater from Superfund Sites in Scottsdale. The project included treatment evaluation, including municipal site planning, space planning, reverse osmosis facility design, concept and development, cost estimating, and preparation of construction documents, coordination of agency review, bidding, public outreach services, and construction administration. As Senior Electrical Engineer, Brian assisted with construction phase services.

Education
B.S. - Electrical Engineering,
Ohio State University (1986)
Years of
Experience
10 years with
the firm/ 40
years total
Registration
Registered Electrical
Engineer:

Arizona - 52847
California – E20743
Utah – 8841511-2202
Certifications
MSHA Trained
OSHA 10Hr
Trained
Brian Young, PE
Electrical Engineer

Page 344 ends

Item 11.

Brian Young, PE
Arizona Water Company (AWC) Groundwater Treatment Projects, Arizona Water Company, AZ (Principal, Project Manager, Lead/Senior Project Engineer) As part of the ongoing On-Call contract with Arizona Water Company, WaterWorks has provided design, evaluation, and construction services for various water treatment facilities around Arizona for the projects listed below:
• Pinal Valley Well 13 and Cross Creek Ranch
The Pinal Valley Well 13 Water Facility is owned and operated by Arizona Water Company and supplies potable water to the Pinal Valley Water System. The Water Facility includes a 1,600 gpm onsite well, a 1,600 gpm adsorption arsenic removal facility, a 0.86 Mgal tank, and water storage tank, and 2,300 gpm (firm) booster pump station. PV Well 42 (offsite well) supplies groundwater to the Water Facility. As Senior Electrical Engineer, Mr. Young provided design phase services and office engineering and construction phase services.
• Baseline Arsenic Removal Facility Expansion
The Baseline ARF is owned and operated by Arizona Water Company. The Baseline ARF supplies potable water to the Company’s Apache Junction service area. The Baseline ARF includes a coagulation filtration arsenic removal facility, a water storage tank and a booster pump station and was expanded to increase capacity to accommodate additional water demands. The expansion included the addition of a pressure filter vessel, reconfiguration of filter headers to accommodate the addition of a new filter vessel and construction sequence, new chemical storage and feed facility (FeCl3 and NaOCL), temporary relocation of an existing backwash tank, new backwash tank, new decant, sludge and supernatant pump stations, yard piping and site improvements. As Senior Electrical Engineer, Mr. Young assisted with design phase services and office engineering and construction administration services.

Arizona Water Company: Pinal Valley Well 11 (PV 11) Fluoride Blending Plan and Fluoride Removal Facility Pilot Test and Conceptual Design (Design/Build Project with Hunter Contracting Company) Mr. Young, as Electrical Engineer, has assisted with the creation of design documents for the following:

Fluoride Blending Plan
PV 11 supplies potable water to the Company’s Pinal Valley Water System. The PV Well 11 groundwater has fluoride above the Safe Drinking Water Act (SDWA) maximum contaminant level (MCL) of 4.0 mg/L.

To comply with the fluoride and arsenic MCLs, the Company considered blending PV Well 11, PV 13 and PV Well 42 to reduce arsenic and fluoride and meet the MCLs. A PV 11, PV 13 and PV 42 blending plan was required to comply with the MCLs. WaterWorks, provided engineering services to develop blending plans, coordinate with agency for blending plan permits, and obtain blending plan permits. Additionally, WaterWorks provided design and construction services to the addition of a chlorination system at PV 42, addition of fluoride analyzers at PV 11 and PV 42.

Fluoride Removal Facility
The PV Well 11 groundwater has fluoride above the Safe Drinking Water Act (SDWA) maximum contaminant level (MCL) of 4.0 mg/L. WaterWorks provided engineering services to review fluoride removal technology for PV 11. The review included preliminary bench scale testing and assessment to determine initial parameters, conduct pilot test with the Company and equipment supplier, develop pilot testing evaluation and recommendations, and develop a preliminary design report for the PV 11 Fluoride Removal Facility.

Page 345 ends

Item 11.

Caden Carpenter, PE
Representative Project Experience
Town of Gilbert North Water Treatment Plant Design and Improvements (Electrical Engineer) The Gilbert NWTP is a 60-mgd drinking water plant that treats surface water and groundwater from four different sources. WaterWorks was the Design Engineer that led the team for this project that met an immediate need for improved Disinfection By-Product (DBP) compliance and maximized surface water supplies. The project was challenged by the differing sources of surface water and groundwater with primary sources changing based on the season. Both sources are extreme in their treatability with high turbidity and/or elevated TOC concentrations from one source and low turbidity, poor settleability, and poor filterability found from the other primary source.

Water Works has performed water quality evaluations and identified treatability challenges, led the technology selection to replace and repair deficient and failing infrastructure, as well as expanded the treatment capacity from 45 mgd to 60 mgd to facilitate future capacity expansions. As Electrical Engineer, Caden has assisted with value engineering and differential design GMPs as well as GMP construction administration services.

City of Scottsdale Water Resources Engineering Support Services (Electrical Engineer) The City of Scottsdale (COS) owns and operates a number of surface water, groundwater, wastewater, and advanced reclaimed water treatment facilities. These treatment facilities cover the range of technologies, including Conventional Surface Water Treatment (Coagulation, Sedimentation, Granular Media Filtration), Low Pressure Membrane Filtration (Ultrafiltration/Microfiltration), Cloth Media Filtration, Granular Activated Carbon (GAC) Adsorption, Biological Nitrification/De-Nitrification, Chlorination/Chloramination, Ozonation, Reverse Osmosis, Ultraviolet (UV), Vadose Zone Recharge, Air Stripping, Granular Iron Media Adsorption (Arsenic Removal), and Aquifer Storage and Recovery. Through this contract, Water Works provided process monitoring, technical support, training, and engineering analysis for process optimization. As Electrical Engineer, Caden assisted with 90% and 100% system design.

California Water Service PFAS Program Engineering Assistance: Phase 2 – Engineering Services During Design and Construction (Electrical Engineer)
WaterWorks has been providing engineering services and assistance to California Water Service (CWS) as an Owner’s Agent in support of CWS’ “Design-Build Services – PFAS Water Treatment Program” (Program). This program has involved design-build projects for installing and commissioning 47 PFAS treatment systems in four separate design-build packages. During these packages, Water Works has been taken on a Technical Engineering Lead role, which has included design review and as-needed engineering services. We have also performed select project management tasks and submittal reviews, and design reviews for each of the 47 sites. As Electrical Engineer, Caden has assisted with design reviews and construction technical support.

Mission Springs Water District (MSWD) On-Call General Engineering Support Services (Electrical Engineer) Water Works was contracted by Mission Springs Water District (MSWD) to provide preliminary design services for the installation of temporary hexavalent chromium (Cr(VI)) treatment system equipment to treat the Cr(VI) below the anticipated State of California MCL of 10-ug/L for the City of Desert Hot Springs – owned and operated by MSWD. The designated treatment equipment has been decided to be Strong Base Ion Exchange Roll-up Education
B.S. – Electrical Engineering Electrical
Power and Energy Systems
Arizona State University (2019)
A.S. – Engineering Technology
Chandler/Gilbert Community College
(2017)
Years of
Experience
2 years with the
firm/ 7 years total
Registration
Registered Electrical Engineer:

Arizona - 81342
California – 25956
New Mexico – 30993
Utah – 14244508-2202
Washington - 25025948
Caden Carpenter, PE
Electrical Engineer

Page 346 ends

Item 11.

Caden Carpenter, PE
Regeneration (IX-RUR). As Electrical Engineer, Caden has been assisting with treatment equipment coordination support services and basis of design technical memorandum.

Arizona Water Company Rainbow Well No. 6 Forever Chemical Removal Facility (Electrical Engineer) The United States Environmental Protection Agency ("EPA") wanted to institute a Maximum Contaminant Level ("MCL") and Hazard Index ("HI") for Forever Chemicals including PFOA, PFOS, PFBS, GenX, PFHxS, and PFNA.

Arizona Water Company discovered Forever Chemicals in Sedona Rainbow Well No. 6. The well had a production capacity of 353,000 gallons per day. The well pumps directly to the Rainbow Arsenic Removal Facility (“Rainbow ARF”) located in the same site, followed by a 255 GPM booster pump station that pumps into the water system.

Water Works has been assisting Arizona Water Company by performing a technology evaluation to determine the best available, cost-effective, and efficient technology to remove Forever chemicals from Sedona Rainbow Well No. 6. Caden, as Electrical Engineer, has assisted with making a drafty study technical memorandum, performing final study engineering services, and conducting preliminary design.

Arizona Public Water Service PVGS Reverse Osmosis Water System (Electrical Engineer) The Palo Verde Water Resources Facility (PVWR) has been using well water treated through a reverse osmosis (RO) system for drinking water and other clean uses. The existing RO system, installed in the 1980s, had reached the end of its useful life. Water Works provided a study that recommended its replacement with newer RO membrane technology to improve performance and operability, reduce water usage, and facilitate procurement of replacement parts. Subsequently, Water Works has been performing the design and construction administration of the new RO system including replacing four RO units and constructing a new RO building. The new RO system is expected to last at least 27 years and utilize thin film composite (TFC) membranes, raising recovery rates to over 80%. and integrating seamlessly into existing systems at PVWR. As Electrical Engineer, Caden has been assisting with design changes and work breakdown structures.

California Water Service Dominguez 301 (Electrical Engineer) California Water Service (Cal Water) contracted Water Works to provide preliminary and final design services for the Dominguez 301 Treatment Facility Project, which is expected to bring the new Dominguez Well 301 online to supplement the Dominguez District water system. The project includes the design and construction of a well pump, breakpoint reaction tanks, sodium hypochlorite and liquid ammonia sulfate storage and feed systems, and a new concrete masonry unit (CMU) building to house chemical storage, instrumentation, and electrical equipment. DOM 301 is in Long Beach, California, in an area served by Cal Water’s Dominguez District, which supplies approximately 32,800 customers across multiple cities. The new treatment facility is anticipated to enhance water quality by implementing breakpoint chlorination to remove in-situ ammonia and chloramination for secondary disinfection, ensuring compliance with water quality regulations and operational goals. Additionally, site improvements include yard piping, pump-to-waste infrastructure, and site drainage considerations to manage stormwater while maintaining compliance with regulatory entities. As Electrical Engineer, Caden has been assisting with preliminary engineering.

Page 347 ends

Item 11.

Representative Project Experience
Town of Gilbert North Water Treatment Plant Design and Improvements (Senior Structural Engineer) The Gilbert NWTP is a 60-mgd drinking water plant that treats surface water and groundwater from four different sources. WaterWorks was the Design Engineer that led the team for this project that met an immediate need for improved Disinfection By-Product (DBP) compliance and maximized surface water supplies. The project was challenged by the differing sources of surface water and groundwater with primary sources changing based on the season. Both sources are extreme in their treatability with high turbidity and/or elevated TOC concentrations from one source and low turbidity, poor settleability, and poor filterability found from the other primary source. Water Works has performed water quality evaluations and identified treatability challenges, led the technology selection to replace and repair deficient and failing infrastructure, as well as expanded the treatment capacity from 45 mgd to 60 mgd to facilitate future capacity expansions. As Senior Structural Engineer, Martin has assisted with evaluation of existing facilities, pre-design, project meetings and review workshops, design phase-project master docs, 60%, 90%, and 100% detailed design development, quality control/quality assurance, review of RFIs, and value engineering and differential design GMPs.

City of Scottsdale Water Resources Engineering Support Services (Senior Structural Engineer) The City of Scottsdale (COS) owns and operates a number of surface water, groundwater, wastewater, and advanced reclaimed water treatment facilities. These treatment facilities cover the range of technologies, including Conventional Surface Water Treatment (Coagulation, Sedimentation, Granular Media Filtration), Low Pressure Membrane Filtration (Ultrafiltration/Microfiltration), Cloth Media Filtration, Granular Activated Carbon (GAC) Adsorption, Biological Nitrification/De-Nitrification, Chlorination/Chloramination, Ozonation, Reverse Osmosis, Ultraviolet (UV), Vadose Zone Recharge, Air Stripping, Granular Iron Media Adsorption (Arsenic Removal), and Aquifer Storage and Recovery. Through this contract, Water Works provided process monitoring, technical support, training, and engineering analysis for process optimization. As Senior Structural Engineer, Martin has assisted with detailed design and permitting coordination.

City of Scottsdale Thomas Groundwater Treatment Facility (Senior Electrical Engineer) Water Works was retained by the City of Scottsdale as the lead consultant team to evaluate alternatives and provide the design of the City of Scottsdale Thomas Groundwater Treatment Facility. The TGTF is a treatment extension of the Central Groundwater Treatment Facility (CGTF) which treats TCE contaminated groundwater from Superfund Sites in Scottsdale. The project included treatment evaluation, including municipal site planning, space planning, reverse osmosis facility design, concept and development, cost estimating, and preparation of construction documents, coordination of agency Education
M.S. - Civil Engineering,
Brigham Young University (1984)
B.S. - Civil Engineering,
Brigham Young University (1983)
Years of
Experience
8 years
with the
firm/ 42
years total
Registration
Registered Civil Engineer:

Ariz. – 24051 - Structural
Calif. – S3889 - Structural
Calif. – C43331 - Civil
Certifications
City of Phoenix
Special
Inspector
Martin Puhlmann, PE, SE
Structural Engineer

Page 348 ends

Item 11.
review, bidding, public outreach services, and construction administration. As Senior Electrical Engineer, Martin assisted with detailed design.

Arizona Water Company Rainbow Well No. 6 Forever Chemical Removal Facility (Senior Structural Engineer)
The United States Environmental Protection Agency ("EPA") wanted to institute a Maximum Contaminant Level ("MCL") and Hazard Index ("HI") for Forever Chemicals including PFOA, PFOS, PFBS, GenX, PFHxS, and PFNA. Arizona Water Company discovered Forever Chemicals in Sedona Rainbow Well No. 6. The well had a production capacity of 353,000 gallons per day. The well pumps directly to the Rainbow Arsenic Removal Facility (“Rainbow ARF”) located in the same site, followed by a 255 GPM booster pump station that pumps into the water system. Water Works has been assisting Arizona Water Company by performing a technology evaluation to determine the best available, cost-effective, and efficient technology to remove Forever chemicals from Sedona Rainbow Well No. 6. Martin, as Senior Structural Engineer, has been assisting with final study technical memorandum and 30% preliminary design.

Arizona Water Company: Pinal Valley Well 13 Arsenic Removal Facility (Design Build) Mr. Puhlmann, as structural engineer, provided engineering and construction administration services.

The PV 13 ARF is part of the PV 13 Water Facility that supplies potable water to the Pinal Valley Water System. WaterWorks provided design and construction administration for the two PV 13 expansions. The PV 13 expansions included two 800 gpm arsenic removal adsorption vessel systems, bypass blending, back tank, backwash recycle pump station, sodium hypochlorite storage and feed facility, new submersible well pump, electrical and instrumentation controls, civil site and yard piping.

Arizona Water Company: Pinal Valley Well 11 (PV 11) Fluoride Blending Plan and Fluoride Removal Facility Pilot Test and Conceptual Design (Design/Build Project with Hunter Contracting Company) (Senior Structural Engineer)
As Senior Structural Engineer, Mr. Puhlmann helped with the creation of 15% conceptual design documents for the following projects.

Fluoride Blending Plan
PV 11 supplies potable water to the Company’s Pinal Valley Water System. The PV Well 11 groundwater has fluoride above the Safe Drinking Water Act (SDWA) maximum contaminant level (MCL) of 4.0 mg/L.

To comply with the fluoride and arsenic MCLs, the Company considered blending PV Well 11, PV 13 and PV Well 42 to reduce arsenic and fluoride and meet the MCLs. A PV 11, PV 13 and PV 42 blending plan was required to comply with the MCLs. WaterWorks, provided engineering services to develop blending plans, coordinate with agency for blending plan permits, and obtain blending plan permits. Additionally, WaterWorks provided design and construction services to the addition of a chlorination system at PV 42, addition of fluoride analyzers at PV 11 and PV 42.

Fluoride Removal Facility
The PV Well 11 groundwater has fluoride above the Safe Drinking Water Act (SDWA) maximum contaminant level (MCL) of 4.0 mg/L. WaterWorks provided engineering services to review fluoride removal technology for PV 11. The review included preliminary bench scale testing and assessment to determine initial parameters, conduct pilot test with the Company and equipment supplier, develop pilot testing evaluation and recommendations, and develop a preliminary design report for the PV 11 Fluoride Removal Facility.

Page 349 ends

Item 11.

Page 350 ends

Item 11.

Rachel Eising, EIT
Representative Project Experience
California Water Service PFAS Design-Build Engineering Services – Various locations, CA Ms. Eising provided engineering services during design and construction for 47 existing groundwater treatment stations across 6 of Cal Water Districts in California with varying flow rates. The project included administrative services to support the Design-Build Services – PFAS Water Treatment Program.

Washington Water Service PFAS Program Engineering Assistance – Various locations, WA Ms. Eising provided engineering services for RFP development and bidding assistance for 22 existing groundwater treatment stations across Northern and Southern Washington with varying flow rates. The project included administrative services to support the installing and commissioning 22 PFAS treatment systems.

Placer County Water District 2024 Operations & Maintenance 2025 – Rocklin, CA Ms. Eising assisted with updating digital Operations Guides for all 8 of the Agency’s water treatment plants. The Operations Guides serve as a central location for plant information such as equipment O&M manuals, as-built drawings, and SOPs.

Contra Costa Water District Randall Bold Water Treatment Plant Clearwell, Piping, Valve, and Chemical Improvements – Contra Costa, CA.

Ms. Eising provided engineering services for the Randall Bold Water Treatment plant project. The project included replacing the aqueous ammonia feed lines and installing a secondary caustic soda feed line.

Aqueous ammonia feed lines were replaced from their origin at the bulk chemical storage area to the clearwell. New caustic soda feed line was installed from the bulk storage tanks to the clearwell.

Placer County Water District 2024 Operations & Maintenance Manual Project – Rocklin, CA Ms. Eising assisted with developing digital Operations Guides for all 8 of the Agency’s water treatment plants. The Operations Guides serve as a central location for plant information such as equipment O&M manuals, as-built drawings, and SOPs. The Operations Guides include clickable links to relevant documents and are easily navigable for both Operations and Engineering Staff.

Santa Cruz County Sanitation District East Cliff Main Relocation at Murray St. Bridge – Santa Cruz, CA Ms. Eising served as staff engineer working under the project manager on the Murray Street Bridge Sewer Force Main Relocation which was part of the Murray Street Bridge Improvement project. Water Works proved construction support services during the construction phase of the project. The project involved the widening and seismic retrofitting of the 9-span structure over the Santa Cruz Harbor. The relocation of the existing Santa Cruz County Sanitation District’s sewer forcemain consists of one of the utility relocations necessitated by the widening/retrofit project. The project involves multiple construction phases/sequences to facilitate constructability while minimized public impacts.

El Dorado Irrigation District On-Call Services 2023-2025 Ms. Eising assisted in the design and preparation of the bid documents for the El Dorado Irrigation District (EID) Wastewater Treatment Plant (WWTP) Filter rehab project. This project included rehabilitation of Education
B.S. - Civil Engineering,
California State University (2024)
Years of Experience
2 years with the
firm/ 2 years total
Registration
Registered Engineer
in Training - 188236
Rachel Eising, EIT
Staff Engineer

Page 351 ends

Item 11.

Rachel Eising, EIT
two of the six existing tertiary treatment filters, which are trident adsorption clarification/ filtration units.

The project addressed the failure of two of the underdrain systems, inclusive of air scour piping, granular filter media and buoyant adsorption clarifier media and retaining screens.

El Dorado Irrigation District Sly Park Intertie Improvements Project – Pollock Pines, CA Ms. Eising served as the Staff Engineer collaborating with the team on design to this multi-facility, cross country project. This project included the replacement of a vital transmission main pipeline and booster pump station to connect two surface water treatment and distribution systems with different water quality constraints in Pollock Pines area in El Dorado County. This allowed for the shut down and maintenance of respective surface water treatment facilities, allowing for blending, and reduced pumping costs.

Casitas Municipal Water District Ventura County/Santa Barbara Intertie – Ojai, CA Ms. Eising served as the staff engineer working with the team for the preliminary design, PS&E for a bidirectional potable water transmission project between Santa Barbara and Ventura counties. The project provides mitigation to multiple hazards threatening regional water infrastructure for coastal communities with limited water supplies. Water Works Engineers developed the technical engineering report and identified constraints, a range of alignments, and recommended a project alternative that incorporated the bi-directional 8000-LF of 16” FPVC & CMCL steel pipe (design flow: 4500 gpm @ 150 to 450 PSI), 2x booster pump stations to pump water up to and along the Rincon mountain transmission main (built by USBR in the 1960s) to Casitas, and a dual treatment system to convert Free Chlorine (Carp. Valley) to/from Chloramine residual in the water supply.

Paradise Irrigation District Disaster Recovery Management Services – Paradise, CA Ms. Eising provided engineering services for the development and recommendation of recovery effort strategies as well as procedures the Paradise Irrigation District (PID) water distribution system following unprecedented damage resulting from the 2018 Camp Fire. Mr. Roy modeled different water distribution system scenarios in WaterGEMS to assist with recovery planning. Results of the model were integrated with GIS data to provide figures to convey results.

City of Roseville West Side Tank and Pump Station – Roseville, CA Ms. Eising assisted with design, plans and specifications for two pre-stressed concrete tanks, booster pump station, and new crew facility. The water tanks and pump station were delivered using the City’s design assist CM at Risk project delivery method and the crew build as design- build. Improvements to the greenfield site included:
 Two 6 MG partially buried AWWA D110 Type I pre-stressed concrete tank(s).  Booster Pump Station – four 3800 GPM @ 170’ TDH vertical turbine pumps and controls.  CMU block building with pump, E&IC and chemical feed rooms  Site design to minimize material off-haul and provide post construction drainage water quality enhancements
 Mechanical stabilized earth foundation improvements under tank to minimize differential settlement
 Crew building with office, training, lavatory, showers, kitchen and shop to support water operations and maintenance staff
 Architectural features of the site followed master planned community CC&Rs.

Page 352 ends

Item 11.

Chad Seidel, Ph.D., P.E.

President
Page | 1
Dr. Chad Seidel is the President and a founding partner at Corona, bringing more than 25 years of consulting experience providing small and large drinking water utilities with expert process engineering services. He is a nationally recognized authority on hexavalent chromium [Cr(VI)] occurrence and treatment, having spearheaded compliance, discovery, and testing initiatives for California drinking water supplies since 2000. His foundational expertise in this sector is anchored by a Ph.D. from the University of Colorado Boulder, where his doctoral dissertation focused explicitly on this topic:
“Investigation of Hexavalent Chromium as a Future Regulated Drinking Water Contaminant”.

Representative Projects
Hexavalent Chromium Compliance, Coachella Water Authority, CA: All of Coachella Water Authority’s (CWA) groundwater sources are impacted by the Division of Drinking Water's (DDW) 10 µg/L Cr(VI) maximum contaminant level (MCL). CWA has retained Corona to evaluate the most appropriate treatment technology to achieve Cr(VI) compliance, as well as to support them through regulatory requirements and preliminary design. As the Principal in Charge for this project, Chad is directing the team's efforts, including treatment alternatives analysis, bench- and pilot-scale testing, DDW permitting, and collaboration with design partners.

He is also supporting communications with leadership and customers.

Evaluation of Options to Comply with California’s Proposed Hexavalent Chromium Level, Coachella Valley Water District, California: The Coachella Valley Water District (CVWD) selected a multidisciplinary team consisting of West Yost, Confluence Engineering, and Corona to evaluate long-term options for complying with the California State Water Resources Control Board's Cr(VI) MCL of 10 µg/L. A primary focus of this effort was minimizing the total number of treatment systems required while maintaining an adequate water supply and system redundancy. This project included in-depth bench- and pilot-scale evaluations of stannous chloride without filtration, alongside other best available technologies. As the Principal in Charge, Chad directed the testing and assessment of both treatment and non-treatment compliance alternatives. He collaborated with CVWD staff to present these outcomes to the CVWD Board.

Hexavalent Chromium Well Treatment Improvements, Watsonville, CA: In collaboration with Carollo Engineers, Corona assisted the City of Watsonville in addressing Cr(VI) in six wells with concentrations exceeding 10 µg/L. Initially engaged in 2014, Corona identified Reduction Coagulation Filtration (RCF) as the preferred technology due to lower lifecycle costs and the City's ability to discharge backwash residuals to the sewer. This recommendation was validated via pilot testing, which also identified methods to reduce equipment footprints using high-rate, low-density filter media. This approach decreased instantaneous backwash rates by 75%, eliminating the need for storage tanks. Following the reinstatement of the MCL in 2024, the team was re-engaged to confirm these recommendations against updated water quality data.

Corona confirmed RCF as the most cost-effective solution and identified several wells requiring PFAS coremoval. Corona continues to serve as the treatment process technical advisor throughout the design phase.

Licenses
Registered Professional Engineer – AZ, CO, GA, IL, MA, NY, NJ, PA, TX, WA Education
Ph.D., Civil Engineering, University of Colorado Boulder, 2006 M.S., Civil Engineering, University of Colorado Boulder, 2000 B.S., Environmental Engineering, Montana Tech of the University of Montana: Valedictorian, 1998

Page 353 ends

Item 11.

Chad Seidel, Ph.D., P.E.

President
Page | 2
Hexavalent Chromium Implementation Study, Soquel Creek Water District, CA: Soquel Creek Water District (District) requires treatment for three groundwater wells to maintain compliance for DDW’s Cr(VI) MCL of 10 µg/L. Accordingly, the District engaged Corona to summarize the recommended treatment approach required for the District to achieve compliance, while accounting for the considerable efforts already expended to comply with the previous iterations of the MCL. This study included an overview of the available hexavalent chromium treatment technologies, site-specific water quality and production for the impacted wells, and the associated cost impacts for consolidated treatment of the impacted wells. This project also included a pilot study to inform full-scale design of a consolidated reduction coagulation filtration treatment facility for hexavalent chromium removal and ongoing design review. The new facility is expected to be operational in 2027.

Relevant Publications
Chad has published dozens of peer reviewed journal manuscripts and delivered over 100 presentations regarding water quality issues including Cr(VI). Selected relevant examples include:

Kennedy, A., Gregory, B., Medina, M., Whichard, D., Edjan, E., Henrie, T., Seidel, C., & Gorman, C. (2024).

Risks of stannous chloride without filtration for hexavalent chromium treatment. AWWA Water Science, 6(4), e1381.

Gorman, C., Kennedy, A., Samson, C., Plummer, S., Townsend, E., & Seidel, C. (2023). Improvements in the reduction coagulation filtration process for hexavalent chromium treatment. AWWA Water Science, 5(1), e1315.

Henrie, T., Plummer, S., Orta, J., Bigley, S., Gorman, C., Seidel, C., Shimabuku, K., & Liu, H. (2019). Full-scale demonstration testing of hexavalent chromium reduction via stannous chloride application. AWWA Water Science, 1(2), e1136.

Moffat, I., Martinova, N., Seidel, C., & Thompson, C. M. (2018). Hexavalent chromium in drinking water. Journal-American Water Works Association, 110(5), E22-E35.

Gorman, C., Seidel, C., Henrie, T., Huang, L., & Thompson, R. (2016). Pilot testing strong base anion exchange for Cr(VI) removal. Journal-American Water Works Association, 108(4), E240-E246.

Li, X., Green, P. G., Seidel, C., Gorman, C., & Darby, J. L. (2016). Chromium removal from strong base anion exchange waste brines. Journal-American Water Works Association, 108(4), E247-E255.

Li, X., Green, P. G., Seidel, C., Gorman, C., & Darby, J. L. (2016). Meeting California's hexavalent chromium MCL using strong base anion exchange resin. Journal-American Water Works Association, 108(9), E474- E481.

Seidel, C. J., & Corwin, C. J. (2013). Total chromium and hexavalent chromium occurrence analysis. JournalAmerican Water Works Association, 105(6), E310-E319.

Seidel, C. J., Najm, I. N., Blute, N. K., Corwin, C. J., & Wu, X. (2013). National and California treatment costs to comply with potential hexavalent chromium MCLs. Journal-American Water Works Association, 105(6), E320-E336.

McGuire, M. J., Blute, N. K., Seidel, C., Qin, G., & Fong, L. (2006). Pilot-scale studies of hexavalent chromium removal from drinking water. Journal-American Water Works Association, 98(2), 134-143.

Qin, G., McGuire, M. J., Blute, N. K., Seidel, C., & Fong, L. (2005). Hexavalent chromium removal by reduction with ferrous sulfate, coagulation, and filtration: a pilot-scale study. Environmental science & technology, 39(16), 6321-27.

Page 354 ends

Item 11.

Craig Gorman, P.E.

Principal
Page | 1
Craig has nearly 20 years of experience specializing in the treatment of groundwater contaminants. His technical expertise includes lead roles in technology selection, bench- and pilot-scale evaluations, cost estimating, and design for a variety of constituents including hexavalent chromium [Cr(VI)], arsenic, nitrate, fluoride, boron, uranium, and radium. Recently, he led Corona’s support for multiple utilities in California to identify optimal treatment configurations for Cr(VI) impacted wells while ensuring a congruent understanding of production needs. His work focuses on evaluating Best Available Technologies (BAT) to address complex water quality profiles, specifically evaluating the technical and economic viability of Reduction Coagulation Filtration (RCF) and ion exchange to meet stringent regulatory limits. Craig is proficient in navigating the California State Water Resources Control Board regulatory framework and has extensive experience conducting pilot studies to validate treatment processes for full-scale implementation.

Representative Projects
Evaluation of Options to Comply with California’s Proposed Hexavalent Chromium Level, Coachella Valley Water District, California: This multifaceted project re-evaluated water supply and treatment needs for the Coachella Valley Water District (CVWD) based on the current understanding of Cr(VI) treatment. A primary objective was to minimize the number of required treatment systems by maximizing the use of CVWD’s lowchromium groundwater supplies. Corona led the bench-scale evaluation of stannous chloride (SnCl2) without filtration and developed the pilot-scale testing protocol. While initially considered a promising, low-cost alternative, testing identified several critical failure points for this approach. Consequently, efforts shifted to evaluating other Best Available Technologies (BATs), which determined that reduction coagulation filtration (RCF) offered the lowest capital, operational, and lifecycle costs for CVWD. Additionally, Corona proposed and developed the water quality monitoring program that identified PFAS contamination in the system requiring treatment. The project culminated in a recommendation to achieve compliance by installing four clustered RCF systems in La Quinta (two), Sun City, and Desert Hot Springs, along with 14 new production wells, the rehabilitation of one existing well, transmission main improvements, and seven storage reservoirs.

Hexavalent Chromium and PFAS Well Treatment Improvements, City of Watsonville, CA: In collaboration with Carollo Engineers, Corona assisted the City of Watsonville in addressing Cr(VI) in six wells with concentrations exceeding 10 µg/L. During the initial 2014 regulatory period, the City engaged Corona to identify the appropriate treatment approach. RCF was identified as the preferred technology due to lower lifecycle costs and the City's ability to discharge backwash residuals to the sewer system. This recommendation was validated through comprehensive pilot testing, which also identified ways to reduce equipment footprints by implementing high-rate, low-density filter media. This approach decreased instantaneous backwash rates by 75%, eliminating the need for backwash storage tanks. After the initial maximum contaminant level (MCL) was rescinded and subsequently reinstated in 2024, Watsonville reengaged the project team. Corona confirmed that RCF remains the most cost-effective solution. During the study’s initial water quality analysis, Corona identified data gaps, requested additional sampling, and discovered several wells requiring PFAS co-removal. Corona continues to serve as the treatment process technical advisor through the design phase with MKN & Associates.

Licenses
Registered Professional Engineer – Colorado
Education
M.S. Civil Engineering, University of Colorado at Boulder, Boulder, CO, August 2005 B.S. Environmental Science, State University of New York at Plattsburgh, Plattsburgh, NY, December 1999

Page 355 ends

Item 11.

Craig Gorman, P.E.

Principal
Page | 2
Indio Water Authority Hexavalent Chromium Compliance Support, Indio, CA: In anticipation of the Division of Drinking Water (DDW) Cr(VI) MCL, the Indio Water Authority (IWA) engaged Corona to develop a Cr(VI) Treatment Roadmap. This involved evaluating current water quality and production needs against the current state of science for BATs. A primary consideration was the handling of discharge waste. Corona completed a 14-week RCF pilot study to validate ferrous dosing, characterize backwash quantity and quality, establish hydraulic loading rates, and demonstrate backwash water recycling. The outcomes verified the iron dose and contact time, characterized the waste, and confirmed the filter media configuration. Since this study, IWA elected to pursue a strong base anion exchange (SBA-IX) treatment approach for compliance. Corona continues to provide technical advisory services as IWA evaluates roll-up regeneration for their existing SBAIX systems, including the development of a test plan to seek approval for a full-scale demonstration of the roll-up regeneration process at a Cr(VI)-impacted well site.

Stannous Chloride Evaluation, California Water Service, Dixon District, CA: The application of SnCl2, an NSFcertified corrosion inhibitor, was considered a potential compliance alternative for Cr(VI) treatment. In this application, SnCl2 is added at the wellhead to reduce Cr(VI) to trivalent chromium without filtration. While successful at maintaining concentrations below the MCL, this method raises concerns regarding the fate, accumulation, and potential release of chromium in distribution systems and premise plumbing. Corona designed a simulated system at the pilot scale using representative pipe materials to study chromium accumulation. The system included in-home appurtenances, such as sediment and water filters, to understand how SnCl2 treated water impacts these items. Results showed significant accumulation of tin and chromium on pipe surfaces, fouling of in-home filtration devices, and samples with total chromium results more than 50 times the regulated limit. These findings prompted the client to proceed with RCF for compliance. Corona continues to provide support through the design phase, including developing the test matrix for upcoming vendor piloting.

Hexavalent Chromium Implementation Study, Soquel Creek Water District, CA: The Soquel Creek Water District (District) required treatment for three groundwater wells to comply with the Cr(VI) MCL of 10 µg/L.

Corona was engaged to summarize the recommended treatment approach, accounting for previous compliance efforts. The study provided an overview of available technologies, site-specific water quality and production data, and cost impacts for consolidated treatment. The project also included a pilot study to inform the full-scale design of a consolidated RCF treatment facility, along with an ongoing design review.

The new facility is expected to be operational in 2027.

Relevant Publications
Gorman, C., Kennedy, A., Samson, C., Plummer, S., Townsend, E., Seidel, C. (2023), Improvements in the Reduction Coagulation Filtration Process for Hexavalent Chromium Treatment. AWWA Water Science.

Kennedy, A., Gregory, B., Medina, M., Whichard, D., Edjan, E., Henrie, T., Seidel, C., Gorman, C. (2024) “Risks of stannous chloride without filtration for hexavalent chromium treatment”. AWWA Water Science.

Li, X. , Green, P. G., Seidel, C. , Gorman, C. and Darby, J. L. (2016), Meeting California's Hexavalent Chromium MCL Using Strong Base Anion Exchange Resin. Journal - American Water Works Association, 108: E474-E481.

Plummer, Sarah & Gorman, Craig & Henrie, Tarrah & Shimabuku, Kyle & Thompson, Robert & Seidel, Chad. (2018). Optimization of strong-base anion exchange O&M costs for hexavalent chromium treatment. Water Research.

Gorman, C. , Seidel, C. , Henrie, T. , Huang, L. and Thompson, R. (2016), Pilot Testing Strong Base Anion Exchange for CrVI Removal. Journal - American Water Works Association, 108: E240-E246.

Page 356 ends

Item 11.

Brittany Gregory, P.E.

Senior Water Process Engineer
Page | 1
Brittany is a Senior Water Process Engineer with experience in drinking water and wastewater research, as well as environmental remediation. She is focused on maximizing treatment performance and solving complex drinking water challenges for utilities by providing technical leadership on projects involving prevalent inorganic contaminants, including arsenic, manganese, and hexavalent chromium [Cr(VI)]. While Brittany primarily focuses on treatment process optimization through bench- and pilot-scale testing and water quality modeling, she also has extensive experience in distribution system water quality, data management, data visualization, and process modeling. She has a proven ability to lead multidisciplinary teams from initial process selection and treatment validation through full-scale implementation to ensure successful regulatory compliance.

Recently, Brittany has been helping utilities in California on their path for compliance with Cr(VI), manganese, and PFAS.

Representative Projects
Hexavalent Chromium Compliance, Coachella Water Authority, CA: With all Coachella Water Authority (CWA) groundwater sources were impacted by the Cr(VI) MCL, CWA retained Corona to evaluate treatment technologies and provide regulatory and design support. As the project manager, Brittany oversaw the schedule, budget, and resource planning. She also managed the development of the treatment technology evaluation that identified reduction coagulation filtration (RCF) as the optimal treatment at all wellsites, planned and executed bench- and pilot-scale testing, and assisted in developing the preliminary design report for the impacted well sites. Additionally, Brittany assists with regulatory communications, including customer notifications, the submission of the compliance plan accepted by the Division of Drinking Water (DDW), and ongoing funding support from the California Department of Water Resources Evaluation of Options to Comply with California’s Proposed Hexavalent Chromium Level, Coachella Valley Water District, California: The Coachella Valley Water District (CVWD) selected a multidisciplinary team consisting of West Yost, Confluence Engineering, and Corona to evaluate the most effective long-term compliance options for the DDW Cr(VI) maximum contaminant level (MCL) of 10 µg/L. A primary focus of this effort was to minimize the total number of treatment systems required for compliance while maintaining an adequate water supply and system redundancy. This work included an in-depth evaluation of stannous chloride (SnCl2) without filtration at both bench and pilot scales, as well as an assessment of other best available treatment technologies for Cr(VI) removal. Brittany helped develop the permit amendment approved by the DDW for the pilot-scale evaluation of SnCl2 without filtration.

She also assisted with the development, execution, and data analysis for bench- and pilot-scale testing.

Additionally, Brittany proposed and developed the water quality monitoring program that identified PFAS contamination in the system requiring treatment. Ultimately, the pilot-scale testing identified several critical failure points for the SnCl2 approach, shifting the project focus toward alternative treatment technologies.

Brittany assisted in developing the final deliverable that recommended RCF as the optimal treatment for CVWD. She also planned and executed RCF bench-scale testing to refine the project team’s understanding of the reduction times and ferrous doses required for the specific wells designated for Cr(VI) treatment.

Licenses
Registered Professional Engineer – New Brunswick, Nevada, IntPE and APEC Education
MASc., Civil and Resource Engineering, Dalhousie University, Halifax, Nova Scotia, 2017 BScE., Geological Engineering, University of New Brunswick, Fredericton, New Brunswick, 2015

Page 357 ends

Item 11.

Brittany Gregory, P.E.

Senior Water Process Engineer
Page | 2
Hexavalent Chromium and PFAS Well Treatment Improvements, City of Watsonville, CA: In collaboration with Carollo Engineers, Corona assisted the City of Watsonville in addressing Cr(VI) levels in six wells that exceeded the upcoming MCL. Corona developed Class 5 capital and operations and maintenance cost estimates for various blending and treatment scenarios, ultimately supporting the selection of RCF as the most cost-effective and operationally familiar technology for long-term compliance. Brittany completed the initial water quality analysis for this study and identified several wells that also required the co-removal of PFAS. This discovery led to a separate treatment alternatives analysis and cost estimates for the co-removal of these contaminants. Corona continues to support the City as a technical advisor through the design phase with MKN & Associates.

Stannous Chloride Evaluation, California Water Service, Dixon District, CA: The California Water Service (Cal Water) Dixon water system has multiple groundwater sources with Cr(VI) concentrations exceeding the DDW MCL. While three of these wells use regenerable SBA-IX for removal, a newly constructed well lacks treatment. Cal Water contracted Corona to determine the feasibility of using SnCl2 without filtration to reduce Cr(VI) to trivalent chromium prior to distribution. Bench- and pilot-scale testing were conducted to evaluate required SnCl2 doses and reduction times, as well as the impact on various pipe materials and premise plumbing fixtures. Brittany aided in the test plan development and implementation, completed the data analysis, and co-authored a peer-reviewed article on the study findings published in AWWA Water Science. She continues to support Cal Water through the design phase for the implementation of RCF treatment, including test matrix development and technical oversight for the upcoming vendor piloting of the proposed design.

Hexavalent Chromium Implementation Study, Soquel Creek Water District, CA: The Soquel Creek Water District engaged Corona to develop a treatment approach for three groundwater wells to maintain compliance with the Cr(VI) MCL. This study included an overview of available treatment technologies, sitespecific water quality and production analysis, and cost impacts for consolidated treatment. The project also featured a pilot study to inform the full-scale design of an RCF treatment facility. Brittany developed the treatment implementation study report, which included 20-year net present worth estimates, and executed the bench- and pilot-scale testing for the selected technology. She also managed project tasks, including supervising pilot staff and providing operational updates for progress meetings. Brittany presented the pilot findings at the 2025 AWWA ACE conference and provided treatment design support through 100% design Indio Water Authority Hexavalent Chromium Compliance Support, Indio, CA: In anticipation of the DDW Cr(VI) MCL, Indio Water Authority (IWA) engaged Corona to develop a Cr(VI) Treatment Roadmap. This included an evaluation of current water quality and production needs against the BATs. A primary consideration was the handling of discharge waste. Brittany supported a 14-week RCF pilot study to validate ferrous dosing, characterize backwash quantity and quality, establish hydraulic loading rates, and demonstrate backwash water recycling. The outcomes verified the iron dose and contact time, characterized the waste, and confirmed the filter media configuration. Since this study, IWA elected to pursue an SBA-IX treatment approach for compliance. Corona continues to provide technical advisory services as IWA evaluates roll-up regeneration for their existing SBA-IX systems, including the development of a test plan to seek approval for a full-scale demonstration of the roll-up regeneration at a Cr(VI) impacted well site.

Publications
Kennedy, A., Gregory, B., Medina, M., Whichard, D., Edjan, E., Henrie, T., Seidel, C., Gorman, C. (2024) “Risks of stannous chloride without filtration for hexavalent chromium treatment”. AWWA Water Science. 6(4), August 2024
Gorman, C., Kennedy, A., Gregory, B., Butler, C., Corwin, C., Johnson, S., Seidel, C. (2023) “Identifying Causes and Controls for Intermittent Nitrate Release from Granular Activated Carbon”. Water Research Foundation, Project Number 2046 (2023)

Page 358 ends

Item 11.

Mathieu Medina
Water Process Engineer
Page | 1
Mathieu Medina is a Water Process Engineer with experience in drinking water quality and water treatment process evaluation and optimization.

Through desktop analysis and bench- and pilot- scale testing he has assisted systems across the country in achieving their treated water and distribution system water quality goals with a focus in water quality and treatment process modeling and data analysis and visualization. Recently, Mathieu has been supporting utilities in California on their path for compliance with hexavalent chromium and in Arizona to improve and optimize their ion exchange treatment operations and performance.

Representative Projects
Hexavalent Chromium Compliance, Coachella Water Authority, CA: Coachella Water Authority (CWA) engaged Corona to evaluate the most appropriate treatment technology to achieve compliance at their hexavalent chromium [Cr(VI)] impacted groundwater wells, as well as supporting them through regulatory requirements and preliminary design with the support of Water Works Engineers (WWE). Mathieu developed a treatment implementation study report comparing strong base anion exchange (SBA-IX), weak base anion exchange (WBA-IX), and reduction coagulation filtration (RCF) treatment options for the six wellsites, including 20-year net present worth estimates based on capital and operations and maintenance (O&M) costs. He planned and executed RCF bench-scale testing to evaluate ferrous chloride for all of CWA’s Cr(VI) impacted wells. Mathieu supported pilot-scale testing at one of the impacted CWA wells to answer key design questions for full scale RCF treatment and backwash disposal options through on-site activities, data analysis, and client communication. He prepared the final pilot report which detailed the outcomes and implications of the pilot and bench-scale studies to inform preliminary design and treatment implementation for CWA.

Evaluation of Options to Comply with California’s Proposed Hexavalent Chromium Level, Coachella Valley Water District, California: Coachella Vally Water District (CVWD) selected a multi-disciplinary team, consisting of West Yost, Confluence Engineering, and Corona to evaluate the best long-term option for CVWD to comply with the California State Water Resources Control Board Division of Drinking Water (DDW) Cr(VI) maximum contaminant level (MCL) of 10 µg/L. A primary focus of this effort was to minimize the total number of treatment systems that would be needed to comply with the rule, while still maintaining adequate water supply and system redundancy. This included an in-depth evaluation of stannous chloride without filtration at bench-scale and the pilot-scale, as well as the evaluation of other best-available treatment technologies to achieve Cr(VI) removal. Mathieu supported the execution of bench-scale testing with stannous chloride without filtration; following, he supported the development and execution of bench-scale testing of RCF with ferrous chloride reductant to inform reduction times and ferrous doses required for wells expected to be treated for Cr(VI) compliance.

Stannous Chloride Evaluation, California Water Service, CA: California Water Service’s (Cal Water) Dixon Water system has multiple groundwater sources with Cr(VI) at concentrations exceeding the DDW MCL of 10 µg/L. Three of these wells utilize regenerable SBA-IX to remove Cr(VI) to below the anticipated MCL; however, a newly constructed groundwater well with elevated Cr(VI) is not yet equipped with treatment.

CalWater contracted Corona to determine the feasibility of applying stannous chloride without filtration to reduce Cr(VI) to trivalent chromium to achieve the anticipated MCL prior to distribution. Mathieu conducted Education
M.S.E., Environmental and Water Resources Engineering, University of Texas at Austin, Austin, Texas, 2023 B.S., Chemical Engineering, Massachusetts Institute of Technology, Cambridge, Massachusetts, 2021

Page 359 ends

Item 11.

Mathieu Medina
Water Process Engineer
Page | 2
bench-scale testing to evaluate the required stannous chloride doses and reduction times to achieve sufficient Cr(VI) reduction, along with its impact on various pipe materials and typical premise plumbing fixtures in parallel with pilot testing. The results obtained from this study were summarized in a peerreviewed article co-authored by Mathieu and published in AWWA Water Science.

Hexavalent Chromium Implementation Study, Soquel Creek Water District, CA: Soquel Creek Water District (District) requires treatment for three groundwater wells to maintain compliance for DDW’s Cr(VI) MCL of 10 µg/L. Accordingly, the District engaged Corona to summarize the recommended treatment approach required to achieve compliance, while accounting for the considerable efforts already expended to comply with the previous iterations of the MCL. This study included an overview of the available Cr(VI) treatment technologies, site-specific water quality and production for the impacted wells, and the associated cost impacts for consolidated treatment of the impacted wells Mathieu supported a pilot study to inform fullscale design of a consolidated reduction coagulation filtration treatment facility for Cr(VI) removal and ongoing design review. On-site pilot testing activities incldued sample collection, water quality analysis, and backwash water characterization.

Page 360 ends

Item 11.

JAMESA. BIANCHIN, PG, CEG
Jim is a Principal Engineering Geologist with more than 43 years of experience in managing and providing engineering geologic services for complex geotechnical projects located in Oregon, Nevada, throughout California, and in the former Soviet Union. He specializes in managing multifaceted, detailed geotechnical studies for difficult access sites and characterization of complex, geologically impacted sites.

Representative Project Experience
The following are brief project descriptions that highlight Jim s experience:

Oakland to San Francisco Bay Bridge Replacement Jim managed the preliminary geotechnical studies for the onshore components at Yerba Buena Island for the replacement of the Bay Bridge. These services included extensive onshore coring and geophysical surveys, offshore coring and downhole in-situ testing, extensive laboratory testing and geotechnical modeling, and preparation of a preliminary geotechnical report for the project.

Coastal Aqueduct Extension (Phase II) of the California State Water Project.

Jim was the manager of geotechnical services and responsible engineering geologist for the design of the Central Coast Water Authority s components of the Coastal Aqueduct Extension (Phase II) of the California State Water Project. This project included 73 miles of large-diameter flexible pipeline, three 2-million-gallon prestressed concrete tanks, a 40-million gallon-per-day water treatment plant, a pump station, a scour evaluation of the pipeline crossing of the Santa Maria River, and a microtunnel alignment beneath the Santa Ynez River.

Marathon Oil s Sakhalin Island, Russia, Feasibility Study. Marathon Oil obtained the first offshore oil and gas lease within Russia following the breakup of the Soviet Union. To develop the offshore oil field extraction and onshore infrastructure to support the processing and shipping of petroleum in this remote eastern margin of Russia, Marathon performed the first Environmental Impact Statement prepared using western standards. Jim interacted with Russian representatives while on Sakhalin Island, managed the collection and dissemination of geologic and geotechnical data relative to the project, and managed a team of geologists and geotechnical engineers in preparing the Geologic Resources section for the environmental document.

Redwood Creek Levee Stability Evaluation, Humboldt County. Jim managed geotechnical services for the evaluation of the 3.4-mile-long levee system (twin levees - 6.8 miles total), which was constructed in 1968 and was in the process of being recertified. The studies included performing explorations at 92 locations using sonic cores, cone penetrometer soundings, and conventional hollow-stem auger drill holes. The project involved extensive laboratory testing and transient seepage, slope stability, liquefaction, and settlement analyses for 18 cross sections along the levee to evaluate potential deficiencies for the levee system. 1 Page
ADA
Geosciences, Inc. BA RESUME
Position
Principal Engineering
Geologist
Years of
Experience
43 Education
B.A - Geology
California State University
at Humboldt
Registration
Professional Geologist
CA - 5966
Certified Engineering
Geologist
CA - 1644
OR - E1989
Associations
Association of
Environmental &
Engineering Geologists
American Society of Civil
Engineers
American Public Works
Association
Redding West Rotary Club

Page 361 ends

Item 11.

BA ADA JAMES A. BIANCHIN, PG, CEG RESUME
Geosciences, Inc.

Levees, Treatment
Plants and
Processing
Facilities
Pipelines, Tanks,
and Pump
Stations
Blue Lake Levee Geotechnical Evaluation, Humboldt County, CA; Jacobs Avenue Levee, Eureka, CA;
Redwood Creek Levee Geotechnical Evaluation, Orick, Humboldt County, CA; Olney Creek Levee, Redding, CA;
City of Shasta Lake WWTP Expansion project, Shasta Lake, CA; Clear Creek WWTP Levee Certification Study, Redding, CA Clear Creek WWTP Facilities Expansion, Redding, CA
Sierra Army Depot, Herlong, Lassen County, CA;
Battle Mountain WTP Battle Mountain, NV;
Dominguez Hills Well No. 203 Carson, CA;
Burney Creek Floodwall Study, Shasta County, CA;
Stillwater WWTP Expansion, Redding, CA
City of Fort Bragg Newman Gulch Reservoir, Mendocino County, CA; Port Orford Wastewater Treatment Plant, Port Orford, OR; Willows Wastewater Treatment Plant Expansion, Willows, CA; Fall River Mills Wastewater Facility Modification, Shasta County, CA; Coastal Aqueduct Extension (Phase II) CA Water Project, Kern, San Luis Obispo & Santa Barbara Counties; Polonio Pass Water Treatment Plant, San Luis Obispo County, CA; Santa Barbara El Estero Wastewater Treatment Plant, Santa Barbara, CA; Exxon s Las Flores Oil Processing Facility, Santa Barbara County, CA; Unocal s Platform Irene Oil Processing Facility, Santa Barbara County, CA; Calleguas Filtration Plant, Ventura County, CA;
Santa Barbara Desalination Facility, Santa Barbara, CA; MWD s Jensen Filtration Plant, Los Angeles County, CA;
Guadalupe Wastewater Treatment Plant, Santa Barbara County, CA; Delta Diablo s Bay Point Sewer Repairs, Contra Costa County, CA Columbine Station, San Jose, CA
Vickery Tank Replacement Project, Saratoga, CA
Overlook Tank, Los Gatos, CA;
12 large diameter steel tanks, San Jose Water Co.

McKean Tank and Pipeline, San Jose, CA;
Belgatos Reservoir, Los Gatos, CA;
Santa Rosa Tanks, Los Gatos, CA;
Franciscan Station, San Jose, CA;
Cambrian Station, Campbell, CA;
City of Redding s North Market St. HDD project, Redding, CA; City of Redding s North Market St. Lift Station, , Redding, CA City of Redding s Jenny Creek Sewer Pipeline & Lift Station, Redding, CA City of Redding s Mistletoe Sewer Replacement, Redding, CA; City of Redding s San Francisco Sewer Replacement, Redding, CA; City of Redding s Lake Redding Interceptor Pipeline, Redding, CA; City of Redding s Butte Street Water Pipeline Pipe Ramming Project, Redding, CA; Stillwater Business Park Sewer Pipelines, Shasta County, CA; Coastal Aqueduct Extension (Phase II) California State Water Project; City of Eureka s Martin Slough Conveyance Project, Eureka, CA; City of Port Orford s Wastewater Outfall Project, Port Orford, OR; Nacimiento Water Supply Project, San Luis Obispo County, CA; Whale Rock Pipeline Vulnerability Assessment, San Luis Obispo County, CA; All American Pipeline Project, Santa Barbara, Ventura & Los Angeles Counties, CA; Westside Conveyance Pipeline, Santa Barbara, CA;
Exxon Company USA s Las Flores Oil Storage Tanks, Santa Barbara County, CA; Texaco Transportation Corp s Gaviota Storage Facility, Santa Barbara County, CA; Carpinteria Valley Water District s Water Storage and Conveyance Project, Carpinteria, CA; Camarillo Wastewater Treatment Plant, Camarillo, CA
2 Page Page 362
Item 11.

BA ADA JAMES A. BIANCHIN, PG, CEG RESUME
Geosciences, Inc.

Roadway,
Transportation,
Airport, and
Bridge Projects
Landslides,
Faults,
Liquefaction,
Geohazards
Assessments, and
Mitigation Projects
School,
Educational,
Hospital, Critical
Facility, &
Recreational
Projects
Modoc County Roads 1, 91, 111N
Sacramento Drive Bridge, Redding, CA;
Inwood Road Bridge, Shasta County, CA;
Beaver Creek Bridge, Lassen County, CA;
Stillwater Creek Bridges, Shasta County;
Caltrans Highway 299, Buckhorn Grade Realignment Project, Phase I, Shasta County, CA; Caltrans Highway 89, Lake Britton Bridge, Shasta County, CA; Caltrans, San Francisco to Oakland Bay Bridge Replacement Project, Oakland & San Francisco, CA; Caltrans Highway 5, Gibson Maintenance Facility Expansion, Shasta County, CA; Klamath Falls International Airport Taxiway F Improvement Project, Shasta County, CA; Shasta County Old 44 Bridge Replacement, Shasta County, CA Caltrans Highway 154 Realignment, Santa Barbara County, CA; Caltrans Highway 1 Realignment, Santa Barbara County, CA; Santa Rosa Road Realignment Project, Santa Barbara County, CA; USAF Honda Ridge Road Stabilization Project, Vandenberg Air Force Base, Santa Barbara County, CA; Exxon USA s Santa Ynez Development Emergency Access Road, Santa Barbara County, CA; Susanville Airport, Lassen County, CA;
Redding Municipal Airport (three studies), Redding, CA; Oregon Air National Guard 173rd Fighter Wing, Kingsley Field, Klamath County, CA; Little River Airport, Mendocino County, CA
Round Valley Airport, Covelo, Mendocino County, CA;
Benton Airport, Redding, CA;
Lampson Field, Lake County, CA;
Battle Creek, Eagle Canyon Rockfall Mitigation, Manton, Shasta & Tehama Counties, CA; Shannon fault location study, Los Gatos, CA
Exxon Company USA s Corral Canyon Tributary Landslide, Santa Barbara County, CA; USAF Honda Ridge Road Landslide Stabilization Project, Vandenverg AFB, Santa Barbara County, CA; USAF Pillar Point Tracking Station Landslide and Coastal Retreat Studies, San Mateo County, CA; Aera Energy s Devil s Slide Study, Ventura County, CA;
Whale Rock Pipeline Vulnerability Assessment, San Luis Obispo County, CA; Nacimiento Water Supply Project Vulnerability Assessment, San Luis Obispo County, CA; Honey Lake Paleoseismic Study, Lassen County, CA;
Ventura Fault Paleoseismicity Study, Ventura, CA;
Malibu Fault Paleoseismicity Study, Los Angeles County, CA; Oak Ridge, Red Mountain, Simi-Santa Rosa, Garlock, and Hosgri Fault Location Studies; San Andreas Fault Study, Palmdale, CA;
Harbor Sanitation District Chetco River Crossing, Brookings, OR; Port Orford Sewer Outfall Project, Port Orford, OR;
Panorama Landslide Expert Witness Services, Dunsmuir, CA; Central Valley High School Additions, Shasta Lake, CA;
Buckeye School General Purpose Addition, Shasta County, CA; Shasta County Juvenile Rehabilitation Facility, Shasta County, CA; Law Enforcement Center, City of Shasta Lake, CA;
Weed Public Safety Facility, Weed, CA;
Ambrosini School Expansion, Fortuna, CA;
Mercy Medical Center New Parking Structure, Redding, CA; Mercy Medical Center, New Operating Complex, Mt. Shasta, CA; Fairchild Medical Center, Critical Care Nursing Facility, Yreka, CA; Mercy Medical Center, South Parking Lot Failure Study, Redding, CA; Arcata Schools New Child Care Facility, Arcata, CA;
Big League Dreams Sports Complex, Redding, CA;
U.C. Santa Barbara, numerous new buildings, Goleta, CA; 3 Page Page 363
Item 11.

David V. Cymanski, PE, GE
1 Page
ADA
Geosciences, Inc. BA RESUME
Position
Principal Geotechnical
Engineer
Years of
Experience
35 Education
B.S. - Civil Engineering
California State University
at Chico
Registration
California Registered Civil
Engineer (C51421)
California Registered
Geotechnical Engineer
(GE 2585)
Oregon Registered Civil
Engineer (80732)
Affiliations
American Society of Civil
Engineers
California Geotechnical
Engineers Association
Dave is a principal geotechnical engineer with over 35 years of experience as a consultant in the areas of geotechnical engineering. His experience has covered a wide variety of engineering projects throughout California, Oregon, and throughout the United States. His experience includes
roadways, pipelines, heavy industrial facilities, airports, erosion control, characterization of site conditions, evaluations of geologic hazards, and surface and subsurface drainage
facilities.

Representative Experience
 Responsible charge of geotechnical engineering, materials testing, special inspection and environmental consulting.
 Manage and perform subsurface investigation and geotechnical design activities.
 Manage Environmental Site Assessments.
 Perform geotechnical Expert Witness services; construction materials evaluations, and forensic studies of distressed structures, concrete foundations, pavements, retaining walls, drainage & landslides.
 Engineering oversight and compaction testing for all grading, excavation and earthwork filling operations.
 Evaluate and test subsurface ground improvement construction & underground utility backfill placement.
 Analyze and recommend pavement designs including lime & cement modification and stabilization.
 Foundation design and review including piling, drilled piers, caissons, footings & post-tension slabs.
 Provide soil criteria and analysis of soil nail, tie-back, MSE, CMU & conventional retaining walls.
 Evaluate and analysis of global slope stability, landslides & earth movement.
 Bridge, dams and canal studies.

TERRASEARCH, INC., Fairfield & Dublin, CA, 1989-1996
 Project Engineer & Staff Engineer.
 Perform geotechnical engineering investigations for commercial, industrial, residential and public works.
 Perform compaction testing of earthwork operations.
 Perform special inspections of reinforced and pre-stressed concrete, structural masonry & structural steel.
 Supervise engineering technicians and laboratory during grading and foundation operations.
 Review civil and structural plans for geotechnical conformance.  Evaluate distressed structures and perform forensic investigations of earthwork projects.

Page 364 ends

Item 11.

Appendix B - Scope of Work

Page 365 ends

Item 11.

P a g e | 1
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

SCOPE OF WORK
The following services will be provided by Water Works Engineers (WWE) for the CWA Hexavalent Chromium Treatment Design at Seven Well Sites (Project). This Scope of Work has been split into Tasks and Subtasks as follows:

Task Title
1 Project Administration, Management, and Quality Assurance/Quality Control 2 Environmental Coordination
3 Utility Research and Potholing
4 Project Survey
5 Geotechnical Investigation
6 Basis of Design Report / 30% Design
7 60% Design Submittal
8 90% Design Submittal
9 100% Design Submittal
10 Final Design Submittal
11 Bid Phase Assistance
12 Public Outreach and Communication (Optional)
13 Engineering Services During Construction
14 Permitting Support Services
Task 1 – Project Administration, Management, and Quality Assurance/Quality Control
Under this subtask, WWE will monitor and track the project budget and schedule to help ensure that all deadlines are met and that the project budget is not exceeded. WWE will coordinate with the Project Team to address items such as project schedule, project budget, and current issues of concern. WWE will also monitor progress and submit monthly progress reports to CWA. The following will be performed under this subtask:
1) Project Kick-off Meeting and Site Visit (to be conducted at local CWA Office followed by pre-design site visits at each well site)
a) WWE introductions to local CWA staff
b) Familiarize WWE with all project facilities
c) Gather operational data
d) Agree on Project Objectives
e) Agree on Project Components
2) Project Communication and Control
a) Coordination of all of WWE’s Project Team activities b) Communication of project progress and issues to CWA staff c) Project schedule maintenance and control of project tasks to keep project schedule on track d) Cost tracking of all engineering activities and active cost control of fees. e) Project Data Request Log (updated and disseminated as needed) f) Project Decision Log (updated and disseminated as needed) g) Ongoing State Water Resources Control Board, Department of Financial Assistance - Drinking Water State Revolving Fund (SWRCB, DFA – DWSRF) assistance
3) Quality Assurance/Quality Control
a) Plan and implement Quality Assurance/ Quality Control Policy with the entire project team b) Ensure QA/QC procedures are being followed at each step in the design process

Page 366 ends

Item 11.

P a g e | 2
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Meetings • Project Kick-Off and Field Reconnaissance Meeting (In-person/Teleconference and follow-up site walk)
• Weekly Project Update Meetings (Virtual; 1-hr./meeting) Deliverables • Project Kick-Off Meeting – Agenda and Meeting Notes (Elec., .docx and .pdf) • Weekly Project Update Meeting – Agenda and Meeting Notes (Elec., .msg and .pdf) • Monthly Status Reports, including Project Schedule and Project financials • Monthly Invoicing with Budget Summary Table
Task 2 – Environmental Coordination
WWE will provide support for CWA and CWA’s consultant, Terra Nova Planning & Research, Inc. (Terra Nova), to complete California Environmental Quality Act (CEQA) and CEQA-Plus documentation. Terra Nova will complete the CEQA and CEQA-Plus analysis for the Project, ensuring that the CEQA documentation will comply with applicable federal EPA NEPA requirements to support CWA’s application for funding through the SWRCB-DFA Drinking Water State Revolving Fund (DWSRF). CWA will act as the Lead Agency and the SWRCB will serve as the NEPA reviewer.

WWE will support CWA and Terra Nova in completing the CEQA-Plus documentation. WWE’s support will include attending coordination meetings, providing input on the project description, maps, schedules, and exhibits, and assistance in responding to public comments, if applicable.

Meetings • Environmental Compliance Coordination Meetings (Virtual; Up to 6 mtgs.;1- hr./mtg.)
Deliverables • Cultural Resources Analysis Review Comments (Elec., .docx or xlsx., and .pdf ) • Biological Resources Analysis Review Comments (Elec., .docx or xlsx., and .pdf ) • Air Quality and GHG Analysis - Design/Construction assumptions Review (Elec., .docx or xlsx., and .pdf )
• IS/MND Review Comments (Elec., .docx or xlsx., and .pdf ) Task 3 – Utility Research and Potholing
WWE will conduct utility research within the project areas, including along with the proposed sewer connection alignments to identify existing underground utilities. Based on available utility information, WWE will prepare a potholing plan showing the anticipated utility locations and utility types for CWA review prior to field investigation.

Following CWA review of the potholing plan, WWE’s subconsultant, Boudreau Pipeline Corporation (Boudreau) will perform utility potholing to verify the horizontal location and depth of existing underground utilities. This scope assumes up to five potholes per site, for a total of 35 potholes. Boudreau will document the findings in a Utility Potholing Report that will be provided to CWA and utilized by WWE in the design of the Project.

Meetings • Pothole Plan Review Meeting (Virtual; 2-hrs.) Deliverables • Draft and Final Pothole Plan (Elec., .pdf) • Utility Potholing Report (Elec., .pdf)

Page 367 ends

Item 11.

P a g e | 3
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Task 4 – Project Survey
WWE’s design surveying subconsultant, Calvada Surveying, Inc. (Calvada), will perform the following general design survey services (prevailing wage) in support of the design documents provided by WWE for the Project for each of the seven sites:

Surveying and Mapping - Surveying shall utilize researched benchmark data to provide planimetric and topographic to create a topographic base file, using NAVD 88 for vertical control and CCS83 for horizontal control.

The topographic survey information (based on 1-ft contour intervals) will include, but is not limited to:
• Identification of project control and benchmarks.
• Location of property corners and lines, permanent structures, and any relevant roadway features • Labeling of road names and property owners.
• Location of significant obstacles such as fences, trailers, sheds, vaults, power poles, light poles, trees, signs, etc. within and near project area.
• Location of existing fire hydrants, water valves, sewer manholes, and utility risers/boxes/vaults. • Setting construction benchmark(s) for listing on plans (northing, easting, elevation, description). • Location of existing connection points to the existing water distribution schematics with associated appurtenances
• Location of aboveground utilities
• Location of underground utilities identified by USA striping if USA striping performed prior to site survey
• Record of Survey – Well 12 and Well 18 only
Meetings • None
Deliverables • Site Survey CADD Files, including 3D surface file(s) (Elec., AutoCAD Civil 3D) • Signed/stamped Topographic Survey (Elec., .pdf)
• Record of Survey for Well 12 and 18; Total of 2 (Elec., .pdf) Task 5 – Geotechnical Investigation
WWE’s geotechnical subconsultant, Bajada Geosciences, Inc. (BAJADA), will perform a geotechnical investigation in support of the design documents prepared by WWE for the Project. BAJADA will prepare a comprehensive geotechnical report characterizing subsurface conditions and provide geotechnical recommendations necessary for construction of all Project components. Geotechnical investigation services include the following:

Subtask 5.1 – Pre-Exploration
Prior to subsurface exploration, BAJADA will mark proposed exploration locations at each well site and will contact Underground Service Alert (USA) to assist in identifying potential buried utility conflicts, as required by law. During this task, BAJADA will review selected, available, geologic and geotechnical data pertinent to the Project. Those data will likely include:
 Geotechnical data related to existing improvements located at the existing wells, if available;  Geologic hazard studies and zonation for the project region;  Historical aerial photographs of the project region;
 Regional geologic information; and
 LiDAR data for the site from open-source databases.

Page 368 ends

Item 11.

P a g e | 4
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Subtask 5.2 – Subsurface Exploration
BAJADA will explore each well site using exploratory drill holes advancing the following number of drill holes:

PROPOSED EXPLORATIONS
Well No. Number & Depths of Explorations
11 1 x 50’ deep, 1 x 20’ deep, & 1 x 10’ deep
12 1 x 50’ deep, 1 x 20’ deep, & 1 x 10’ deep
16 1 x 50’ deep, 1 x 20’ deep, & 1 x 10’ deep
17 1 x 50’ deep & 1 x 20’ deep
18 1 x 50’ deep & 1 x 10’ deep
19 1 x 50’ deep & 1 x 20’ deep
20 1 x 50’ deep & 1 x 20’ deep
Drilling will be performed using hollow-stem auger and/or rotary wash drilling methods. Sampling will be performed at approximately 5-foot-depth increments or less using a California-modified split spoon (CM) or Standard Penetration Test (SPT) sampler. CM and SPT samplers will be driven using a 140-pound auto-trip hammer in accordance with standard test methods ASTM D3550 and ASTM D1586. California modified splitspoon samples will be collected in 2.5-inch diameter by 6-inch-long brass or stainless-steel sleeves. Those sleeves will be capped, labeled, and transported to a laboratory for testing.

BAJADA personnel will log the soils and rocks exposed in the explorations using the Unified Soil Classification System (USCS). BAJADA will estimate exploration locations using a handheld Global Position System (GPS) receiver. Drill holes will be destroyed immediately following completion of sampling and logging. Cuttings will be spread and disposed of on site.

In addition, infiltrometer tests will then be performed at each well site using a modified Philip Dunne Infiltrometer in accordance with standard test method ASTM D8152. The infiltrometer testing will provide a hydraulic conductivity value for use in designing retention/detention basins and can be converted to percolation rates, if needed. Up to three infiltrometer tests will be performed at each well site.

Page 369 ends

Item 11.

P a g e | 5
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Subtask 5.3 – Laboratory Testing
Soil samples obtained during Subtask 5.2 will be delivered to a laboratory for testing. It is anticipated that the following laboratory tests will be performed during the course of this study:

ANTICIPATED LABORATORY TESTING SCHEDULE
Test
Standard
Test
Method
Well No.

Total
11 12 16 17 18 19 20
In-Situ Moisture
Density
ASTM
D2937 15 15 15 12 12 12 12 93
Grain-Size
Distribution
ASTM
D6913 6 6 6 4 4 4 4 34
Direct Shear ASTM
D3080 1 1 1 1 1 1 1 7
Consolidation ASTM
D2435 1 1 1 1 1 1 1 7
Collapse ASTM
D5333m 1 1 1 1 1 1 1 7
Max. Dry Density/Opt.

Moisture Content
ASTM
D1557 1 1 1 1 1 1 1 `7
R-Value Cal 301 1 1 1 1 1 1 1 7
Soil Chemistry AASHTO
T290/291 1 1 1 1 1 1 1 7
The actual types and numbers of tests that will be performed will be determined after the field exploration has been completed.

Subtask 5.4 – Geotechnical Analysis
Upon completion of the above-noted Task 5 subtasks, BAJADA will perform geotechnical evaluations for each of the well sites. Those evaluations will include the following for each well site:
 Geologic hazards that could impact each site;
 Subsurface soil profiles at the sites;
 Evaluation of groundwater depths and distribution, if encountered;  Excavatability of the on-site soils and rocks;
 2025 CBC seismic design parameters;
 Collapse potential of underlying soils;
 Anticipated total and differential settlement values;  Static and dynamic lateral earth pressures for retention structures;  Evaluation of expansive soil influence on project foundations and improvements;  Allowable bearing capacities, friction coefficients, passive pressures, etc.;  Modulus of soil reaction (E’N) for pipeline design;
 Hydraulic conductivity of near-surface soils; and
 Evaluation of structural pavement sections.

Page 370 ends

Item 11.

P a g e | 6
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Subtask 5.5 – Geotechnical Reporting
Results of the field investigation, laboratory testing, and engineering analyses will be summarized and concluded in a separate geotechnical report for each well site, as specified in the RFP. Those reports that will contain, at a minimum, the following:
 A description of the proposed project including a site plan showing the approximate location of the explorations advanced for this study;
 A description of select, existing, available data collected, reviewed, and utilized during this study;  A discussion regarding geologic hazards that could impact each well site;  A description of the site surface and subsurface conditions encountered at the time of our field investigation;
 A geologic map showing the distribution of earth materials across each well site;  Estimates of collapse potential exists beneath each site;  Estimates of total and differential settlement that could impact on the proposed improvements;  Estimated excavatability of soil and rock materials at the site;  Modulus of soil reaction (E’N) at each site;
 Hydraulic conductivities estimated for each well site;  2025 CBC seismic design parameters;
 Recommendations related to geotechnical aspects of:
o Site grading and drainage, including compaction criteria and potential reuse of on-site soils as select backfill materials;
o Allowable bearing capacities for structure foundations & slabs; o Allowable passive pressures for foundations, thrust blocks, and piers; o Lateral earth pressures (active, at-rest, and passive) under static and dynamic conditions for retention structures;
o Coefficients of friction for soil materials;
o Temporary excavations and shoring; and
o Structural pavement sections
 An appendix presenting a summary of the field investigation including exploration logs denoting sampling intervals and laboratory test results;
 An appendix presenting the results of our laboratory testing; and  An appendix presenting the results of the infiltrometer testing.

Meetings • None
Deliverables • Geotechnical Report (Elec., .pdf)

Page 371 ends

Item 11.

P a g e | 7
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Task 6 – Basis of Design Report/30% Design
WWE will produce a Basis of Design Report (BODR) and 30% design plan set for each of the seven well sites.

The BODR and 30% design plan set will include, at a minimum, the following information for each of the seven well sites:
1) Executive Summary
2) Introduction and Background
a) Description of existing facilities
b) Project location and site conditions
c) Nearby utilities, easements, and additional land requirements, if any 3) Project Purpose
a) Problem Description
b) Project Overview
4) Design Criteria
a) Applicable building codes
b) Seismic, wind, and other structural design criteria
c) Treatment design parameters and assumptions
5) Project Description
a) Process description
b) Simplified Process and Instrumentation Diagram (P&ID) c) Hydraulic analysis, including anticipated pressure losses through the treatment process d) Major equipment description, including lead times and estimated useful life e) Facility Layout/ Site Plan/ Drainage
f) Ancillary Systems
i) Electrical (including single-line diagram)
ii) Instrumentation and Controls
iii) Plumbing
6) 30% Design Drawings
a) Simplified P&ID
b) Civil, structural, and mechanical site plan
c) Electrical and instrumentation site plan
d) Electrical single-line diagram showing existing and proposed facilities e) Sewer pipeline alignment and connection location, as required per site 7) Draft Control Strategy
8) Opinion of Probable Construction Cost and Operation and Maintenance Cost 9) Project Schedule
10) Additional Project Support – Water Quality Monitoring and Baseline Confirmation (as provided by Corona) to include:
a) Continue to monitor and verify the historical water quality against ongoing groundwater monitoring results across all seven wellsites to safeguard full-scale RCF operations from potential water quality changes.
b) Develop a targeted water quality sampling protocol and provide data analysis following Well 16’s rehabilitation. This work will be used to verify that 2025 bench-scale results remain valid for fullscale design criteria and ensure no other contaminants of concern challenge the RCF treatment process at the intended design flow rate.
c) Establish baseline water quality conditions for the newly developed Well 20 wellsite once drilling is finished and well development is complete. Corona will review the water quality data at the design flow rate and confirm treatment sizing and provide treatment recommendations.

Page 372 ends

Item 11.

P a g e | 8
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

The BODR will be submitted to CWA twice; once in Draft form and then a Final BODR will be issued. Prior to the submittal of the Draft and Final BODR, the work product will be reviewed internally through the QA/QC process and, upon submittal to CWA, will have been reviewed and revised in accordance with the QA/QC plan. After the Draft BODR is prepared and submitted, WWE will hold the DRAFT BODR Review Workshop with CWA. Following the BODR Review Workshop, CWA will have 10 working days to review and to provide comments to WWE. WWE will meet with CWA to obtain feedback and solicit questions and clarifications, as required, for inclusion in the Final BODR.

Meetings • Draft BODR (30% Design) Review Workshop, total of 2-3 mtgs. (In-person/Online Video Confs; 1-hr./site)
Deliverables • Draft BODR, total of 7, 1 per site (Elec., .docx and .pdf) • DRAFT BODR Review Workshop Agenda and Meeting Notes (Elec., .pdf) • Final Draft BODR, total of 7, 1 per site (3 Hard copies per site, if requested; Elec., .pdf)
• Updated Data Request and Decision Logs (Elec., native format) Final Design
WWE will prepare the necessary contract documents (construction plans, typical details, specifications, and cost estimates) for the Project, based on the design criteria and recommendations included in the Final BODR. The preparation of the final design will be completed in four submittals: 60%, 90%, 100%, and Final Bid Documents. WWE will provide separate deliverables for each site if requested by CWA. However, WWE recommends a consolidated package through 90% to accelerate DDW and DWSRF review and to improve overall project coordination. The 100% Design and Final Bid Documents submittals will be split by well site, for a total of seven design deliverable packages to facilitate permitting, construction, and Record Drawings.

Prior to each submittal, the work product will be reviewed through WWE’s QA/QC process and, upon submittal to CWA, will have been reviewed and revised in accordance with the QA/QC plan. Presentation of the 60%, 90%, and 100% submittals will occur at the Project Review Workshops (1-day following the submittal) with the entire Project Team. The contents of the submittal will be presented to CWA to familiarize the group with the information being submitted and the design thought process behind the work. Per the Proposed Schedule, following the design submittal, CWA will generally have 10-working days to review and provide any additional comments which were not brought forward in the Project Review Workshops. Please note that additional review time for CWA has been assumed in the Proposed Schedule to account for an assumed 2-week CWA schedule blackout dates during the 2026/2027 Winter Holidays.

The design will include all of the Project facilities specifically listed and described in the RFP, the associated referenced PDR, and this Proposal which generally include the following facilities at each well site:
1) Small diameter vertical reduction vessels
2) Small diameter vertical filter vessels
3) Ferrous chloride chemical feed and storage facilities 4) Well pump and motor replacement (as needed)
5) Yard piping to support treatment system
6) Backwash processing equipment, as needed
a. Catch basin with air gap
b. Sewer pipeline connection
c. Equalization/Settling Tank
d. Recycle pump and piping (Well 19 only)

Page 373 ends

Item 11.

P a g e | 9
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

7) Ancillary Facility Upgrades (fencing, electrical, lighting, grading and drainage) 8) Electrical, Instrumentation, and Controls Upgrades
9) Off-site sanitary sewer piping (excluding Well 19)
Specifications will be provided by WWE for the equipment and materials needed to construct the facilities listed above, at a minimum. The following tasks will be performed:
1) Preparation of 60% Design Documents (option for single design package) 2) Preparation of 90% Design Documents (option for single design package) 3) Preparation of 100% Design Documents (seven packages, one per well site) 4) Preparation of Final Bid Documents (seven packages, one per well site) Task 7 - 60% Design Submittal
The 60% Design Submittal will communicate to CWA the project design so that meaningful discussion can take place and the core project decisions can be made as a group. WWE will use a combination of design drawings, 3-dimensional CADD models, manufacturers’ information, and other communication tools to allow CWA an opportunity for significant input into the design process. WWE will incorporate all comments from 30% design into the 60% Design Submittal. The following deliverables will be provided by WWE with this submittal:
1) 60% Design Drawings:
a) Site Plans
b) Grading and Utility plans
c) Yard Piping Plans
d) Tie-in and Connection Details
e) Hydraulic Profiles
f) Electrical Site Plans
g) Single Line Diagrams, Load Schedules, and Ladder Diagrams h) Conduit Layouts
i) Motor control center and PLC designs
j) Telemetry Designs
k) Mechanical Plans and Sections, including structure geometries l) Structural Plans and Elevations
m) Standard Construction Details
n) Sewer Pipeline Designs (as needed by site)
i) Plan and Profiles
ii) Location of tie-ins and connections
iii) Construction Details
o) Process and Instrumentation Diagrams (P&ID) and Control Block Diagrams 2) 60% Technical Specifications:
a) Draft of Division 26, 33, 40, 43 and 46 specifications 3) Revised Opinion of Probable Construction Cost
4) 60% Process Control Narrative
5) Draft Operations Plan

Page 374 ends

Item 11.

P a g e | 1 0
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

WWE will conduct an independent constructability review of the 60% design submittal to identify long lead items, potential construction challenges, and ways to minimize risk. Key findings and comments from the constructability review will be discussed with CWA and addressed in the 90% design submittal.

Meetings • 60% Design Review Workshop, total of 2-3 mtgs. (In-person/Online Video Confs; 1-hr./site)
Deliverables • 60% Design Drawings (3 hardcopies, 11x17; Elec., .pdf) • 60% Specifications (Elec., .pdf)
• Revised Cost Estimate (Elec., .pdf)
• 60% Process Control Narrative (Elec., .pdf)
• Draft Operations Plan (Elec., .pdf)
• 60% Design Review Workshop Agenda and Meeting Notes (Elec., .pdf) • Updated Data Request and Decision Logs (Elec., native format) Task 8 - 90% Design Submittal
In general, the 90% Design Submittal will be a complete project package, with all design drawings, details and specifications, draft front-end documents, and draft bid documents completed. The 90% Design Submittal will incorporate resolution of design review and constructability comments received on the 60% Design Submittal. The 90% Design Submittal will also be submitted to the City of Coachella, Engineering and Utilities Department and Division of Drinking Water (DDW) for review. In the 90% submittal, 2-dimensional plan and section drawings are incorporated with 3-dimensional isometrics to clearly show how complex piping systems are to be constructed.

Meetings • 90% Design Review Workshop, total of 2-3 mtgs. (In-person/Online Video Confs; 1-hr./site)
Deliverables • 90% Design Drawings (3 hardcopies, 11x17; Elec., .pdf) • 90% Specifications (Elec., .pdf), including DIV 0 and Div 1 (w/ Bid Item Sched. & Desc.)
• Revised Cost Estimate (Elec., .pdf)
• 90% Process Control Narrative (Elec., .pdf)
• Revised Operations Plan (Elec., .pdf)
• 90% Design Review Workshop Agenda and Meeting Notes (Elec., .pdf) • Updated Data Request and Decision Logs (Elec., native format)

Page 375 ends

Item 11.

P a g e | 1 1
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Task 9 - 100% Design Submittal
The period between 90% and 100% will be dedicated to addressing City comments, addressing the available authority having jurisdiction (including IID, RCFD, and DDW) comments, minor inter-disciplinary coordination, final QA/QC checking of all documents. In general, the 100% Design Submittal will be a complete project package, with all design drawings, details and specifications completed for each well site.

The 100% Design Submittal will incorporate resolution of comments received on the 90% Design Submittal.

In the 100% submittal, 2-dimensional plan and section drawings are provided, as needed, to clearly show how the piping system is to be constructed. The 100% Design Submittal will be submitted to all authorities having jurisdiction for review and comment.

Meetings • 100% Design Review Workshop, total of 2-3 mtgs. (In-person/Online Video Confs; 1-hr./site)
Deliverables • 100% Design Drawings for each site (3 hardcopies per site, 11x17; Elec., .pdf) • 100% Specifications for each site (Elec., .pdf)
• Revised Cost Estimate (Elec., .pdf)
• 100% Process Control Narrative (Elec., .pdf)
• 100% Operations Plan (3 hard copies per site, Elec., .pdf) • 100% Design Review Workshop Agenda and Meeting Notes (Elec., .pdf) • Updated Data Request and Decision Logs (Elec., native format) Task 10 - Final Design Submittal
WWE will prepare the Final Design Submittal (Bid Documents), incorporating resolution of comments received on the 100% design submittal. The final package will include signed and stamped plans, specifications, CWA front-end documents, and calculations by a California Registered Engineer, as applicable.

The Final Design Submittal will include final design calculations for all facilities, final Bid Items Schedule and Description, Final Engineer’s Construction Cost Estimate, Final Process Control Narrative, and Final Operations Plan. Prior to submittal, WWE will conduct QA/QC reviews of the project bid drawings, CWA front-end contract specifications, technical specifications, final bid items schedule and description, and final construction cost estimate.

Meetings • None
Deliverables • Bid Ready Design Drawings for each site (11x17), 4 copies per site • Bid Ready Design Drawings for each site (22x34), 2 copy per site • Bid Ready Specifications for each site, 4 copies per site • Final Process Control Narrative (Elec., .pdf)
• Final Operations Plan (3 hardcopies per site; Elec., .pdf) • PDF of Drawings and Specifications (via secure file sharing site) • CADD Files of Drawings (AutoCAD; via secure file sharing site)

Page 376 ends

Item 11.

P a g e | 1 2
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Task 11 – Bid Phase Assistance
WWE will support CWA during the bidding process for the Project. Services will include assisting with contractor pre-qualification evaluations, attending one Pre-Bid Conference, assisting CWA with preparation of the Pre-Bid Conference presentation, responding to technical questions from bidders, and preparing up to three addenda to clarify or amend the Contract Documents. Addenda will be signed and stamped by the Engineer of Record, as required.

CWA will be responsible for advertising the bid package, reviewing and tabulating bids, and preparing the Board Action Item to award the construction contract.

Meetings • Contractor Pre-qualification Evaluation Meeting (In-person/Online Video Confs; 2- hrs.)
• Pre-Bid Conference (Online Video Confs; 1-hr.)
• Pre-Bid Conference - Site Visits (In-person; 4-hrs.)
Deliverables • Contractor Pre-qualification Evaluations (Elec.; .xls or .pdf) • Pre-Bid Conference Agenda, Presentation, and Meeting Notes (Elec., .pdf) • Pre-Bid Conference - Site Visits Agenda and Meeting Notes (Hardcopies and Elec., .pdf)
• Bid-Phase RFI Responses (Elec., native format and .pdf) • Addenda Preparation (up to 3; Elec., .pdf)
• Bid Phase Agenda (3 copies ; Elec., .pdf)
Task 12– Public Outreach and Communication (Optional)
WWE will develop a public outreach and communication plan to support public understanding of the Project and its objectives throughout the planning and design process, if requested by CWA (optional per RFP). The outreach plan will identify key project messages and communication strategies to facilitate consistent and effective public information sharing.

WWE will prepare public information materials, as appropriate, including project fact sheets, frequently asked questions (FAQs), maps, diagrams, website content, and construction impact notifications for affected residents and stakeholders.

Meetings • Initial Public Outreach Communication Strategy Meeting (In-person/online Video Conf; 2-hrs.)
• Draft Engagement Plan Review Meeting (Online Video Confs; 2-hrs.) Deliverables • Draft Engagement Plan Presentation (Elec.; .ppt and .pdf) • Draft and Final Project Fact Sheets, FAQs, maps, and diagrams, includes website content information and graphics (Elec.; native format and .pdf) • Draft and Final Construction Impact Notification Fliers/Bill Insert (Elec.; native format and .pdf)

Page 377 ends

Item 11.

P a g e | 1 3
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Task 13 – Engineering Services During Construction
WWE will provide the following engineering services during construction, assuming a 15- to 18-month construction schedule per the attached Proposed Schedule:
1) Submittal Reviews (up to 525 submittals; 75 submittals per well site) 2) RFI Reviews (up to 210 RFIs; 30 per well site)
3) Change Order Request Review Assistance (up to 35 CORs; 5 per well site) 4) Participation in Weekly Project Conference Calls/Meetings Meetings • Weekly Project Conference Calls (up to 73 meetings, Online Video Conf., 1-hr. each) Deliverables • Submittal Reviews (Up to 525, Elec., .pdf) • RFI Reviews (Up to 210, Elec., .pdf)
• COR Reviews (Up to 35, Elec., .pdf)
Task 14 – Permitting Support Services
WWE will assist CWA in securing permits required for project completion. WWE will engage with appropriate agencies to determine applicable permit requirements for the project. WWE will provide necessary permit application documents and drawings, fill out permit applications, and respond to review comment questions. WWE will perform coordination with the following agencies to obtain all required permits for each of the sites:
1) City of Coachella Engineering and Utilities Department a) Initial Project Coordination (Permit Kick-off/Coordination Meeting incl. presentation of the 30% Design)
b) 60% Design Submittal and Review
c) 90% Design Submittal and Review
d) 100% Design Submittal and Review (Acceptance/Conditional Approval) e) Final Design Submittal (Final Approval/Final Building Permit) 2) Imperial Irrigation District (IID) Utility Coordination, As Needed a) Initial Project Coordination (Permit Kick-off/Coordination Meeting incl. presentation of the 30% Design)
b) 90% Design Submittal and Review
c) 100% Design Submittal and Review (Acceptance/Conditional Approval) d) Final Design Submittal (Final Approval/Final Permit) 3) Riverside County Fire Department
a) Initial Project Coordination (Permit Kick-off/Coordination Meeting incl. presentation of the 30% Design)
b) 90% Design Submittal and Review
c) 100% Design Submittal and Review (Acceptance/Conditional Approval) d) Final Design Submittal (Final Approval/Final Permit) 4) Department of Drinking Water (DDW), including Drawings and Operations Plan submittal a) Initial Project Coordination (Permit Kick-off/Coordination Meeting incl. presentation of the 30% Design)
b) 90% Design Submittal and Review (Incl. PCN and Ops Plan Review) c) 100% Design Submittal and Review (Acceptance/Conditional Approval) d) 100% Operations Plan Submittal and Approval
e) Final Design Submittal (Final Approval/Final Permit) f) DDW Permit Amendment

Page 378 ends

Item 11.

P a g e | 1 4
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

WWE will provide the following additional, site-specific, technical permitting support to CWA:
• Well 11 - Right-of-Way permit applications required from Coachella Valley Water District (CVWD) and Union Pacific Railroad (UPRR)
• Well 16 - Land acquisition activities
Meetings • Initial Project Coordination Meeting - 1-hr. virtual meetings/calls with each Agency (In-person; Total of 4 Meetings; 1-hr/mtg)
• Submittal Review/Discussion Meetings - Up to four 1-hr. meetings/calls with ea.

Agency
(Total of 16 Meetings; Online Video Conf.; 1-hr/mtg)
Deliverables • Meeting Agenda and Meeting Notes (Elec., .pdf) • Meeting Presentation Packages (Elec., native format/.ppt, and .pdf) • Permitting Application, as required per permitting agency • Permitting Application Support Documents, as required per permitting agency Assumptions
The following assumptions have been made in the development of this scope and fee. Additional Task Orders would be required in order to perform any of the work which is not listed in this scope or has been specifically identified as out of scope in the assumptions below:
1) The Project will be designed, bid, and constructed as a single Project including the 7 decentralized treatment facilities.
2) The RFP and the associated referenced PDR serve as the basis for the facility improvements included in the Project and this Proposal
3) Survey Services:
a. Fee based on prevailing wage rates
b. The site will be accessible and clear of obstructions at the requested time of survey. The survey will take place during normal business hours.
4) Geotechnical Services:
a. Fee based on prevailing wage rates, as required
b. A source of water to be used during exploration will be made available by the City c. By contacting USA regarding utility locations on-site, BAJADA will have performed the standard of care and due diligence required to avoid encountering buried utilities during exploration. If mislocated or unlocated utilities are encountered during exploration, BAJADA cannot be held responsible for the adverse effects caused by encountering those utilities. d. No unsuitable or hazardous material are on site.
5) Potholing Services:
a. Fee based on prevailing wage rates
b. By contacting USA regarding utility locations Boudreau will have performed the standard of care and due diligence required to avoid encountering buried utilities during exploration. c. Normal 8 hour work day Monday thru Friday between the hours of 7:00 AM and 3:30 PM d. All paving is temporary AC Cold Mix to a thickness of +/-4" to be maintained and/or replaced by others
6) CEQA/NEPA permitting to be performed by Terra Nova Planning & Research, Inc. 7) No owner-furnished equipment will be utilized in the Project

Page 379 ends

Item 11.

P a g e | 1 5
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

8) Project Funding
a. Project will be funded partially or in whole through state and federal funds received by CWA through the SWRCB-DFA DWSRF Program (DWSRF Funding)
b. WWE will assist in DWSRF Funding acquisition through the following, at a minimum:
i. Preparation of Technical Documents (i.e., Design Submittals: 30% through Final Bid) used in DWSRF Funding application
ii. Reference, adaptation, and summarization of Technical Documents for application and DFA review comment responses
iii. Preparation of the BODR in accordance with DWSRF Program’s “Engineering Report” requirements for CWA’s use in applying for DWSRF Fund reimbursement of the engineering-related Project costs
9) Assumes one set of Standard Details and Specifications, common to all 7 project sites, will be developed for the 60% and 90% Design Submittals
10) All permit fees will be paid by CWA.
11) Assumes CWA will provide review comments within 10 working days, with the exception of the 90% Submittal Review (additional 15-working days due to Winter 2026/2027 Holidays). 12) No hazardous material testing is included.
13) CWA will provide a current title report for all project site-related parcels, per RFP 14) Well 20
a. Well development and design, by Others
b. Site design for typical wellhead treatment (excluding the RCF Facilities identified in the Project), by Others.
i. Wellhead treatment design schedule for all design deliverables will precede the equivalent Project design deliverables by at least 3-months ii. All engineering reports and CAD files will be provided by CWA to Water Works Engineers to inform the Project design
c. CWA will coordinate meetings between the Well 20 Engineer and Water Works Engineers to facilitate the Project design coordination
d. Survey Services – If Water Works Engineers may utilize the survey completed for the Wellhead Treatment Project and it meets all of the Water Works Engineers’ design needs under the Project, Water Works Engineers scope and fee ($11,308) for the Well 20-related survey services for this site may be removed from the Project. e. Geotechnical Services – If Water Works Engineers may utilize the geotechnical completed for the Wellhead Treatment Project and it meets all of the Water Works Engineers’ design needs under the Project, Water Works Engineers scope and fee ($12,000) for the Well 20- related geotechnical services for this site may be removed from the Project.

Page 380 ends

Item 11.

P a g e | 1 6
C i t y o f C o a c h e l l a H e x a v a l e n t C h r o m i u m T r e a t m e n t P l a n t s a t 7 W e l l S i t e s P r o f e s s i o n a l E n g i n e e r i n g D e s i g n S e r v i c e s

Excluded from Scope:
1) The following Water Quality Support Services:
a) Water quality sampling, testing, and reporting (except those services provided in Task 6) b) Pilot and bench-scale testing
c) Analytical testing fees stemming from Well 16's return to service or Well 20's raw water matrix characterization are excluded from this budget and will be billed directly to CWA by their designated certified laboratory
2) The following Survey Services:
a) Title Reports by CWA, per RFP
b) A Record of Survey (except for Well Sites 12 and 18) c) Lot Tie Agreement and Lot Line Adjustment efforts
d) Legal descriptions and exhibits for dedications/easements 3) The following Potholing Services:
a) Fee based on prevailing wage rates
b) By contacting USA regarding utility locations Boudreau will have performed the standard of care and due diligence required to avoid encountering buried utilities during exploration. c) No engineering , bonds, inspection fees, restoration, compaction testing , or waivers of subrogation included.
d) No screening of backfill material included.
e) No import of soils/slurry included.
f) No Soils Report provided with plans.
g) Removal, protection and/or restoration of existing landscape, irrigation, trees, roots, hardscape, paving and/or other existing or proposed improvement
h) Removal of USA paint markings, permanent paving, concrete work, and/or overlay. 4) Site percolation/infiltration testing
5) Landscaping and irrigation design, assumed not needed relative to the existing facilities exclusion of landscape and irrigation
6) Hydraulic modeling beyond the water treatment site point of entry (i.e., distribution and collection system)
7) Transient analysis and/or surge facilities design
8) Arc flash and utility coordination studies, performed by Contractor 9) Radio Study
10) Environmental engineering services/studies, by CWA (Terra Nova) 11) Specialty printing (e.g., Mylars)
12) Public outreach campaigning and signage
13) Permitting fees
14) Traffic Control and/or traffic control plan during construction 15) Construction Management, by Others
16) Construction inspection/observation, by Others or under separate future contract 17) Materials testing, by Others
18) Application programming, provided by Contractor under Construction Contract 19) Project Start-up and Close-out
20) SWPPP, Contractor responsible for preparing SWPPP prior to construction. 21) Well-head equipping and completion of well-head design for Well 20, by Others.

Page 381 ends

Item 11.

Appendix C - Proposed Schedule

Page 382 ends

Item 11.

ID Task
Mode
Task Name Duration Start Finish Predecessors
1 Award/Notice to Proceed 4 days Wed 8/12/26 Mon 8/17/26 2 Total Project Duration 846 days Mon 6/15/26 Mon 9/10/29 3 Task 1 - Project Management 177 days Tue 8/18/26 Wed 4/21/27 4 Initial Data Request and Pre-design Field Visits 5 days Tue 8/18/26 Mon 8/24/26 1 5 Kickoff Meeting 0 days Mon 8/24/26 Mon 8/24/26 4
6 Basis of Design Workshop 0 days Tue 9/22/26 Tue 9/22/26 30 7 60% Design Workshop 0 days Tue 10/27/26 Tue 10/27/26 39 8 90% Design Workshop 0 days Fri 12/18/26 Fri 12/18/26 45 9 100% Design Workshop 0 days Wed 4/21/27 Wed 4/21/27 50 10 Task 2 - Environmental Coordination 133 days Wed 7/1/26 Fri 1/1/27 11 CEQA+_IS/MND (Terra Nova) 133 days Wed 7/1/26 Fri 1/1/27 43FF+10 days 12 Task 3 - Utility Research and Potholing 45 days Mon 9/28/26 Fri 11/27/26 13 Prepare Potholing Plan 5 days Mon 9/28/26 Fri 10/2/26 22 14 Submit Potholing Plan 0 days Fri 10/2/26 Fri 10/2/26 13 15 CWA Review of Potholing Plan 10 days Mon 10/5/26 Fri 10/16/26 14 16 On-Site Potholing Activities 5 days Mon 11/2/26 Fri 11/6/26 15FS+10 days 17 Prepare Utility Potholing Report 15 days Mon 11/9/26 Fri 11/27/26 16 18 Submit Utility Potholing Report 0 days Fri 11/27/26 Fri 11/27/26 17 19 Task 4 - Project Survey 19 days Tue 9/1/26 Fri 9/25/26 20 On-Site Surveying Activities 4 days Tue 9/1/26 Fri 9/4/26 5FS+5 days 21 Prepare Survey Files and Documents 15 days Mon 9/7/26 Fri 9/25/26 20 22 Submit Survey Files and Documents 0 days Fri 9/25/26 Fri 9/25/26 21 23 Task 5 - Geotechnical Investigation 40 days Tue 9/1/26 Mon 10/26/26 24 Pre-Exploration 10 days Tue 9/1/26 Mon 9/14/26 5FS+5 days 25 Sub-Surface Exploration 5 days Tue 9/15/26 Mon 9/21/26 24 26 Laboratory Testing Analysis, and Reporting 25 days Tue 9/22/26 Mon 10/26/26 25 27 Task 6 - Basis of Design Report 36 days Tue 8/25/26 Tue 10/13/26 28 Prepare Draft BODR/30% Design 20 days Tue 8/25/26 Mon 9/21/26 5 29 Submit BODR w/ 30% Design 0 days Mon 9/21/26 Mon 9/21/26 28 30 CWA Basis of Design Workshop 1 day Tue 9/22/26 Tue 9/22/26 29 31 CWA Review Period 10 days Wed 9/23/26 Tue 10/6/26 30 32 Prepare Final BODR 5 days Wed 10/7/26 Tue 10/13/26 31 33 Submit Final BODR 0 days Tue 10/13/26 Tue 10/13/26 32 34 SRF Engineering Report 20 days Wed 9/16/26 Tue 10/13/26 33FF 35 Task 7 - 60% Design 41 days Tue 9/15/26 Tue 11/10/26 36 Prepare 60% Design Submittal 30 days Tue 9/15/26 Mon 10/26/26 22FS-10 days,28FS-5 days 37 Prep. 60% Process Control Narr. (PCN) and Draft Ops Plan 15 days Wed 9/30/26 Tue 10/20/26 31FS-5 days 8/24
9/22
10/27
12/18
4/21
10/2
11/27
9/25
9/21
10/13

M M J S N J M M J S N J M M J S N J M M J S N
Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Critical
Critical Split
Progress
Manual Progress

Page 1 ends

Project: CWA Cr6 Design_Projec
Date: Mon 7/13/26

Page 383 ends

Item 11.

ID Task
Mode
Task Name Duration Start Finish Predecessors
38 Submit 60% Design Submittal, 60% PCN and Draft Ops Plan 0 days Mon 10/26/26 Mon 10/26/26 36,37 39 60% Design Review Workshop 1 day Tue 10/27/26 Tue 10/27/26 38 40 WWE Constructability Review Period 10 days Tue 10/27/26 Mon 11/9/26 38 41 CWA Review Period 10 days Wed 10/28/26 Tue 11/10/26 39 42 Task 8 - 90% Design 64 days Tue 10/27/26 Fri 1/22/27 43 Prepare 90% Design Submittal 39 days Tue 10/27/26 Fri 12/18/26 38,23FF-20 days 44 Submit 90% Design Submittal, Revised PCN and Ops Plan 0 days Fri 12/18/26 Fri 12/18/26 43 45 90% Design Review Workshop 0 days Fri 12/18/26 Fri 12/18/26 44 46 CWA Review Period 25 days Mon 12/21/26 Fri 1/22/27 44 47 Task 9 - 100% Design 70 days Mon 1/25/27 Fri 4/30/27 48 Prepare 100% Design Submittal 60 days Mon 1/25/27 Fri 4/16/27 46,18 49 Submit 100% Design Submittal, PCN and Ops Plan 0 days Fri 4/16/27 Fri 4/16/27 48 50 100% Design Review Workshop 0 days Wed 4/21/27 Wed 4/21/27 49FS+3 days 51 CWA Review Period 10 days Mon 4/19/27 Fri 4/30/27 49 52 Task 10 - Final Design Submittal 25 days Tue 7/13/27 Mon 8/16/27 53 Prepare Final Design and Bidding Documents 25 days Tue 7/13/27 Mon 8/16/27 51,11,108,114,120,126 54 Submit Final Design and Bidding Documents 0 days Mon 8/16/27 Mon 8/16/27 53 55 Funding Acquisition 261 days Fri 1/1/27 Mon 1/3/28
56 Submit to DWSRF 0 days Fri 1/1/27 Fri 1/1/27 45FS+9 days,11,34 57 DWSRF Review (1-yr assumed) 260 days Mon 1/4/27 Fri 12/31/27 56 58 DWSRF Approval 1 day Mon 1/3/28 Mon 1/3/28 57
59 Task 11 - Bid Phase Assistance 90 days Tue 12/7/27 Mon 4/10/28 60 RFP Development 30 days Tue 12/7/27 Mon 1/17/28 58FF+10 days 61 RFP Release 0 days Mon 1/17/28 Mon 1/17/28 60
62 Proposals Preparation 40 days Tue 1/18/28 Mon 3/13/28 61 63 Proposal Due 0 days Mon 3/13/28 Mon 3/13/28 62
64 Contracting and Award 20 days Tue 3/14/28 Mon 4/10/28 63 65 Task 12 - Public Outreach and Communication (Optional) 255 days Tue 8/25/26 Mon 8/16/27 66 Public Outreach During Design 255 days Tue 8/25/26 Mon 8/16/27 5 67 Task 13 - Engineering Services During Construction 370 days Tue 4/11/28 Mon 9/10/29 68 Group 1 Sites (3 Well Sites) 200 days Tue 4/11/28 Mon 1/15/29 69 Submittals 120 days Tue 4/11/28 Mon 9/25/28 64
70 Mobilization 5 days Tue 5/9/28 Mon 5/15/28 102,64,69SS+20 days 71 Construction Period 185 days Tue 4/11/28 Mon 12/25/28 72 Demolition 10 days Tue 5/16/28 Mon 5/29/28 70
73 Underground Utility Work 40 days Tue 5/30/28 Mon 7/24/28 72 10/26
12/18
12/18
4/16
4/21
8/16
1/1
1/17
3/13

M M J S N J M M J S N J M M J S N J M M J S N
Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Critical
Critical Split
Progress
Manual Progress

Page 2 ends

Project: CWA Cr6 Design_Projec
Date: Mon 7/13/26

Page 384 ends

Item 11.

ID Task
Mode
Task Name Duration Start Finish Predecessors
74 Foundation/Civil Work 30 days Tue 7/25/28 Mon 9/4/28 73 75 Long-lead Equipment Procurement 120 days Tue 4/11/28 Mon 9/25/28 69SS 76 Mechanical Installation 40 days Tue 9/5/28 Mon 10/30/28 75FF+20 days,74 77 Elec., Instr. & Controls 40 days Tue 10/31/28 Mon 12/25/28 76 78 Final Grading 10 days Tue 10/31/28 Mon 11/13/28 76
79 Startup and Commissioning 15 days Tue 12/26/28 Mon 1/15/29 78,77 80 Group 2 Sites (2 Well Sites) 285 days Tue 4/11/28 Mon 5/14/29 81 Mobilization 5 days Tue 9/5/28 Mon 9/11/28 74
82 Construction Period 270 days Tue 4/11/28 Mon 4/23/29 83 Demolition 10 days Tue 9/12/28 Mon 9/25/28 81
84 Underground Utility Work 40 days Tue 9/26/28 Mon 11/20/28 83 85 Foundation/Civil Work 30 days Tue 11/21/28 Mon 1/1/29 84 86 Long-lead Equipment Procurement 120 days Tue 4/11/28 Mon 9/25/28 69SS 87 Mechanical Installation 40 days Tue 1/2/29 Mon 2/26/29 86FF+20 days,85 88 Elec., Instr. & Controls 40 days Tue 2/27/29 Mon 4/23/29 87 89 Final Grading 10 days Tue 2/27/29 Mon 3/12/29 87
90 Startup and Commissioning 15 days Tue 4/24/29 Mon 5/14/29 89,88 91 Group 3 Sites (2 Well Sites) 370 days Tue 4/11/28 Mon 9/10/29 92 Mobilization 5 days Tue 1/2/29 Mon 1/8/29 85
93 Construction Period 355 days Tue 4/11/28 Mon 8/20/29 94 Demolition 10 days Tue 1/9/29 Mon 1/22/29 92
95 Underground Utility Work 40 days Tue 1/23/29 Mon 3/19/29 94 96 Foundation/Civil Work 30 days Tue 3/20/29 Mon 4/30/29 95 97 Long-lead Equipment Procurement 120 days Tue 4/11/28 Mon 9/25/28 69SS 98 Mechanical Installation 40 days Tue 5/1/29 Mon 6/25/29 97FF+20 days,96 99 Elec., Instr. & Controls 40 days Tue 6/26/29 Mon 8/20/29 98 100 Final Grading 10 days Tue 6/26/29 Mon 7/9/29 98
101 Startup and Commissioning 15 days Tue 8/21/29 Mon 9/10/29 100,99 102 Task 14 - Permitting Support Services 326 days Mon 6/15/26 Mon 9/13/27 103 City of Coachella Engineering and Utilities Dept Review 224 days Wed 10/14/26 Mon 8/23/27 104 Initial Coordination 5 days Wed 10/14/26 Tue 10/20/26 33 105 60% Review 10 days Wed 11/11/26 Tue 11/24/26 41
106 90% Review 10 days Mon 1/25/27 Fri 2/5/27 46
107 100% Review 10 days Mon 4/19/27 Fri 4/30/27 49
108 Acceptance/Conditional Approval 1 day Mon 5/3/27 Mon 5/3/27 107 109 Final Approval 5 days Tue 8/17/27 Mon 8/23/27 54,108,120,11 110 Imperial Irrigation District (IID) Utility Coordination 326 days Mon 6/15/26 Mon 9/13/27

M M J S N J M M J S N J M M J S N J M M J S N
Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Critical
Critical Split
Progress
Manual Progress

Page 3 ends

Project: CWA Cr6 Design_Projec
Date: Mon 7/13/26

Page 385 ends

Item 11.

ID Task
Mode
Task Name Duration Start Finish Predecessors
111 Initial Coordination 5 days Wed 10/14/26 Tue 10/20/26 33 112 90% Review 20 days Mon 6/15/26 Fri 7/10/26
113 100% Review 40 days Mon 4/19/27 Fri 6/11/27 49
114 Acceptance/Conditional Approval 1 day Mon 5/3/27 Mon 5/3/27 107 115 Final Approval 20 days Tue 8/17/27 Mon 9/13/27 54,108 116 Riverside County Fire Department 326 days Mon 6/15/26 Mon 9/13/27 117 Initial Coordination 5 days Wed 10/14/26 Tue 10/20/26 33 118 90% Review 20 days Mon 6/15/26 Fri 7/10/26
119 100% Review 40 days Mon 4/19/27 Fri 6/11/27 49
120 Acceptance/Conditional Approval 1 day Mon 5/3/27 Mon 5/3/27 107 121 Final Approval 20 days Tue 8/17/27 Mon 9/13/27 54,108 122 Department of Drinking Water (DDW) 199 days Wed 10/14/26 Mon 7/19/27 123 Initial Coordination 5 days Wed 10/14/26 Tue 10/20/26 33 124 DDW Permit Amendment 60 days Mon 4/19/27 Fri 7/9/27 49 125 100% Operations Plan Approval 60 days Mon 4/19/27 Fri 7/9/27 49 126 Acceptance/Conditional Approval 1 day Mon 7/12/27 Mon 7/12/27 124,125,11 127 Final Approval 5 days Tue 7/13/27 Mon 7/19/27 126

M M J S N J M M J S N J M M J S N J M M J S N
Half 1, 2026 Half 2, 2026 Half 1, 2027 Half 2, 2027 Half 1, 2028 Half 2, 2028 Half 1, 2029 Half 2, 2029 Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Critical
Critical Split
Progress
Manual Progress

Page 4 ends

Project: CWA Cr6 Design_Projec
Date: Mon 7/13/26

Page 386 ends

Item 11.

Appendix D - Drawings

Page 387 ends

Item 11.

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/9/2026 4:23:34 PM Designer
Author
Checker
Approver

GATE VALVE

CONTROL VALVE

AIR RELIEF VALVE

STATIC MIXER

CHEMICAL FEED PUMP

TO DISTRIBUTION

SYSTEM/ FINISH WATER

STORAGE TANK WELL
LEGEND:

BWR BACKWASH RECYCLED

BWW BACKWASH WASTEWATER
FECL2 FERROUS CHLORIDE

FM FLOW METER

FW FINISHED WATER

FTW FINISHED WATER TO WASTE

PTW PUMP TO WASTE

RW RAW WATER

SA SAMPLE

SD STORM DRAIN

SHC SODIUM HYPOCHLORITE

TW TREATED WATER

TTW TREAT TO WASTE FILTRATION

VESSELS

REDUCTION

VESSELS
PTW

TW/FW RW NC
FECL2

STORAGE
TANK
SHC

STORAGE
TANK

TO SANITARY
SEWER

AIR GAP
FM FECL2 SHC CATCH BASIN FM FREE CL SA TURBIDITY SA
BWW

DIRECT TO SEWER
WELL 11 AND WELL 18

GENERALIZED PROCESS FLOW DIAGRAM

Page 388 ends

Item 11.

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/9/2026 4:23:34 PM Designer
Author
Checker
Approver

EQUALIZATION TO SEWER
WELL 12, WELL 16, WELL 17, AND WELL 20

GENERALIZED PROCESS FLOW DIAGRAM
WELL
LEGEND:

BWR BACKWASH RECYCLED

BWW BACKWASH WASTEWATER
FECL2 FERROUS CHLORIDE

FM FLOW METER

FW FINISHED WATER

FTW FINISHED WATER TO WASTE

PTW PUMP TO WASTE

RW RAW WATER

SA SAMPLE

SD STORM DRAIN

SHC SODIUM HYPOCHLORITE

TW TREATED WATER

TTW TREAT TO WASTE FILTRATION

VESSELS

REDUCTION

VESSELS FW BWW

BACKWASH

EQUALIZATION
TANK
PTW

TW/FW TTW
RW NC
FECL2

STORAGE
TANK
SHC

STORAGE
TANK

AIR GAP
FM FECL2 SHC

DRY WELL/

CATCH BASIN FM FREE CL SA TURBIDITY SA

TO DISTRIBUTION

SYSTEM/ FINISH WATER

STORAGE TANK

TO SANITARY
SEWER

GATE VALVE

CONTROL VALVE

AIR RELIEF VALVE

STATIC MIXER

CHEMICAL FEED PUMP

Page 389 ends

Item 11.

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/9/2026 4:23:34 PM Designer
Author
Checker
Approver

BACKWASH RECYCLE
WELL 19

GENERALIZED PROCESS FLOW DIAGRAM
WELL
LEGEND:

BWR BACKWASH RECYCLED

BWW BACKWASH WASTEWATER
FECL2 FERROUS CHLORIDE

FM FLOW METER

FW FINISHED WATER

FTW FINISHED WATER TO WASTE

PTW PUMP TO WASTE

RW RAW WATER

SA SAMPLE

SD STORM DRAIN

SHC SODIUM HYPOCHLORITE

TW TREATED WATER

TTW TREAT TO WASTE FILTRATION

VESSELS

REDUCTION

VESSELS FW BWW

BACKWASH

RECLAIM
TANK
PTW

TW/FW BWR

BWR BWR
FM
BWR
PUMP
TTW
RW NC
FECL2

STORAGE
TANK
SHC

STORAGE
TANK FECL2 SHC DRY WELL FM

TO PUMPER
TRUCK

FREE CL SA TURBIDITY SA

TO DISTRIBUTION
SYSTEM

GATE VALVE

CONTROL VALVE

AIR RELIEF VALVE

STATIC MIXER

CHEMICAL FEED PUMP

Page 390 ends

Item 11.

EXISTING GEN SET

EXISTING

TRANSFORMER

EXISTING WELL HOUSE

REDUCTION

VESSELS

BACKWASH
TANK

FERROUS CHLORIDE

CHEMICAL STORAGE

BUILDING

EXISTING

PERIMETER WALL

EXISTING

RETENTION
BASIN

EXISTING

DRIVEWAY

FILTER VESSELS

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY

CONCEPTUAL SITE PLAN
WELL 19 - CR6 TREATMENT

FACILITY IMPROVEMENTS
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/10/2026 10:33:20 AM G-100

GENERAL AB
GR
AB
AB

SITE PLAN
NORTH
PLAN
1" = 10'-0"
10 2010
SCALE 1"=10'
0 FEET

Page 391 ends

Item 11.

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY
WELL 19 - CR6 TREATMENT

FACILITY IMPROVEMENTS
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/9/2026 4:23:34 PM Designer
Author
Checker
Approver 3D RENDERING
WELL 19 - AERIAL VIEW

Page 392 ends

Item 11.

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY
WELL 19 - CR6 TREATMENT

FACILITY IMPROVEMENTS
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/9/2026 4:23:34 PM Designer
Author
Checker
Approver 3D RENDERING
WELL 19 - NORTH FACING VIEW

Page 393 ends

Item 11.

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY
WELL 19 - CR6 TREATMENT

FACILITY IMPROVEMENTS
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/9/2026 4:23:34 PM Designer
Author
Checker
Approver 3D RENDERING
WELL 19 - WEST FACING VIEW

Page 394 ends

Item 11.

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY
WELL 19 - CR6 TREATMENT

FACILITY IMPROVEMENTS
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/9/2026 4:23:34 PM Designer
Author
Checker
Approver 3D RENDERING
WELL 19 - SITE ENTRANCE

Page 395 ends

Item 11.

DRAWING NUMBER

PROJECT NUMBER
DATE
D
C
B
A
4321 65
DESIGN
DRAWN

CHECKED

APPROVED

VERIFY SCALE
BAR IS ONE INCH ON ORIGINAL DRAWING.
0 1"

IF NOT ONE INCH ON

THIS SHEET, ADJUST
SCALES ACCORDINGLY.

REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGN INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SEVICE, IS THE PROPERTY OF WATER WORKS ENGINEERS, LLC.

AND IS NOT TO BE USED, IN WHOLE OR PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OE WATER WORKS ENGINEERS,LLC.

FILE PATH: DATE AND TIME:

SHEET NO.

NO. DATE REVISION BY APVD
24-034
CITY OF COACHELLA - JULY 2026 COACHELLA WATER

AUTHORITY
WELL 19 - CR6 TREATMENT

FACILITY IMPROVEMENTS
Autodesk Docs://Coachella BD /SITE COORDINATION.rvt 7/9/2026 4:23:34 PM Designer
Author
Checker
Approver 3D RENDERING
WELL 19 - EAST FACING VIEW

Page 396 ends

Item 11.

Page 397 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -1- PROFESSIONAL SERVICES AGREEMENT

CITY OF COACHELLA

PROFESSIONAL SERVICES AGREEMENT

1. PARTIES AND DATE.

This Agreement is made and entered into this _______ day of _______________, 2026, by and between the City of Coachella, a municipal corporation organized under the laws of the State of California with its principal place of business at 53462 Enterprise Way, Coachella, CA 92236 County of Riverside, State of California ("City") and Water Works Engineers, LLC, with its principal place of business at 21515 Hawthorne Blvd., Suite 590, Torrance, CA 90503 ("Consultant"). City and Consultant are sometimes individually referred to herein as "Party" and collectively as "Parties."

2. RECITALS.

2.1 Consultant.

Consultant desires to perform and assume responsibility for the provision of certain professional services required by the City on the terms and conditions set forth in this Agreement.

Consultant represents that it is experienced in providing engineering services to public clients, is licensed in the State of California, and is familiar with the plans of City.

2.2 Project.

City desires to engage Consultant to render such professional services for Hexavalent Chromium Treatment Plants at Seven Well Sites ("Project") as set forth in this Agreement.

3. TERMS.

3.1 Scope of Services and Term.

3.1.1 General Scope of Services. Consultant promises and agrees to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional engineering consulting services necessary for the Project ("Services"). The Services are more particularly described in Exhibit "A" attached hereto and incorporated herein by reference. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.

3.1.2 Term. The term of this Agreement shall be from August 26, 2026 to December 31, 2027, unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The Parties may, by mutual, written consent, extend the term of this Agreement if necessary to complete the Services.

3.2 Compensation.

3.2.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "C" attached hereto and incorporated herein by reference. The total compensation shall

Page 398 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -2- PROFESSIONAL SERVICES AGREEMENT
not exceed Four Million Five Hundred Eighty-One Thousand Seven Hundred Fifty-Six Dollars and No Cents ($4,581,756.00) without written approval of the City Council or City Manager, as applicable. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.

3.2.2 Payment of Compensation. Consultant shall submit to City a monthly invoice which indicates work completed and hours of Services rendered by Consultant. The invoice shall describe the amount of Services provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the invoice.

City shall, within 30 days of receiving such invoice, review the invoice and pay all non-disputed and approved charges. If the City disputes any of Consultant's fees, the City shall give written notice to Consultant within thirty (30) days of receipt of an invoice of any disputed fees set forth therein. Payment shall not constitute acceptance of any Services completed by Consultant. The making of final payment shall not constitute a waiver of any claims by the City for any reason whatsoever.

3.2.3 Reimbursement for Expenses. Consultant shall not be reimbursed for any expenses unless authorized in writing by City, or included in Exhibit "C" of this Agreement.

3.2.4 Extra Work. At any time during the term of this Agreement, City may request that Consultant perform Extra Work. As used herein, "Extra Work" means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement.

Consultant shall not perform, nor be compensated for, Extra Work without written authorization from the City.

3.3 Responsibilities of Consultant.

3.3.1 Independent Contractor; Control and Payment of Subordinates. The Services shall be performed by Consultant or under its supervision. Consultant will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Consultant on an independent contractor basis and not as an employee.

Any personnel performing the Services on behalf of Consultant shall not be employees of City and shall at all times be under Consultant's exclusive direction and control. Neither City, or any of its officials, officers, directors, employees or agents shall have control over the conduct of Consultant or any of Consultants officers, employees or agents, except as set forth in this Agreement. Consultant shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law.

Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance.

3.3.2 Schedule of Services. Consultant shall perform the Services in a prompt and timely manner and in accordance with the Schedule of Services set forth in Exhibit "B" attached hereto and incorporated herein by reference. Consultant represents that it has the professional and technical personnel required to perform the Services expeditiously. Upon request of City, Consultant shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services.

Page 399 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -3- PROFESSIONAL SERVICES AGREEMENT

3.3.3 Conformance to Applicable Requirements. All work prepared by Consultant shall be subject to the approval of City.

3.3.4 Substitution of Key Personnel. Consultant has represented to City that certain key personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. The key personnel for performance of this Agreement are as follows:

Andrew Borgic.

3.3.5 City's Representative. The City hereby designates the Cástulo Estrada, or his/her designee, to act as its representative in all matters pertaining to the administration and performance of this Agreement ("City's Representative"). City's Representative shall have the power to act on behalf of the City for review and approval of all products submitted by Consultant but not the authority to enlarge the Scope of Services or change the total compensation due to Consultant under this Agreement. The City Manager shall be authorized to act on City's behalf and to execute all necessary documents which enlarge the Scope of Services or change the Consultant's total compensation subject to the provisions contained in this Agreement.

Consultant shall not accept direction or orders from any person other than the Cástulo Estrada, City's Representative or his/her designee.

3.3.6 Consultant's Representative. Consultant hereby designates, or his/her designee, to act as its representative for the performance of this Agreement ("Consultant's Representative"). Consultant's Representative shall have full authority to represent and act on behalf of the Consultant for all purposes under this Agreement. The Consultant's Representative shall supervise and direct the Services, using his/her best skill and attention, and shall be responsible for all means, methods, techniques, sequences, and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.

3.3.7 Coordination of Services. Consultant agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times.

3.3.8 Standard of Care; Performance of Employees. Consultant shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Consultant represents and maintains that it is skilled in the professional calling necessary to perform the Services. Consultant warrants that all employees and subconsultants shall have sufficient skill and experience to perform the Services assigned to them. Consultant represents that it, its employees and subconsultants have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, and that such licenses and approvals shall be maintained throughout the term of this Agreement. Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant's failure to comply with the standard of care provided for herein. Any employee of the Consultant or its subconsultants who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform

Page 400 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -4- PROFESSIONAL SERVICES AGREEMENT
any of the Services or to work on the Project.

3.3.9 Period of Performance.

3.3.9.1 Consultant shall perform and complete all Services under this Agreement within the term set forth in Section 3.1.2 above (“Performance Time”). Consultant shall also perform the Services in strict accordance with any completion schedule or Project milestones described in Exhibits “A” or “B” attached hereto, or which may be separately agreed upon in writing by the City and Consultant (“Performance Milestones”). Consultant agrees that if the Services are not completed within the aforementioned Performance Time and/or pursuant to any such Performance Milestones developed pursuant to provisions of this Agreement, it is understood, acknowledged and agreed that the City will suffer damage.

3.3.9.2 Neither City nor Consultant shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the non-performing Party. For purposes of this Agreement, such circumstances include a Force Majeure Event. A Force Majeure Event shall mean an event that materially affects a Party’s performance and is one or more of the following: (1) Acts of God or other natural disasters; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the services); (4) strikes and other organized labor action occurring at the site and the effects thereof on the services, only to the extent such strikes and other organized labor action are beyond the control of Consultant and its subcontractors, and to the extent the effects thereof cannot be avoided by use of replacement workers; and (5) pandemics, epidemics or quarantine restrictions. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of a public agency applicable to the services and Agreement.

3.3.9.3 Should a Force Majeure Event occur, the non-performing Party shall, within a reasonable time of being prevented from performing, give written notice to the other Party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement. Force Majeure Events and/or delays, regardless of the Party responsible for the delay, shall not entitle Consultant to any additional compensation.

Notwithstanding the foregoing in this section, the City may still terminate this Agreement in accordance with the termination provisions of this Agreement.

3.3.10 Laws and Regulations; Employee/Labor Certification.

3.3.10.1 Compliance with Laws. Consultant shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Project or the Services, including all Cal/OSHA requirements, and shall give all notices required by law. Consultant shall be liable for all violations of such laws and regulations in connection with the Services and this Agreement. All violations of such laws and regulations shall be grounds for the City to terminate the Agreement for cause.

3.3.10.2 Employment Eligibility; Consultant. Consultant certifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time and shall require all subconsultants

Page 401 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -5- PROFESSIONAL SERVICES AGREEMENT
and sub-subconsultants to comply with the same. Consultant certifies that it has not committed a violation of any such law within the five (5) years immediately preceding the date of execution of this Agreement, and shall not violate any such law at any time during the term of the Agreement.

3.3.10.3 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subconsultant, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of City's Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.

3.3.10.4 Air Quality. To the extent applicable, Consultant must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Consultant shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Consultant, its subconsultants, or others for whom Consultant is responsible under its indemnity obligations provided for in this Agreement.

3.3.10.5 Water Quality Management and Compliance. Consultant shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Services including, without limitation, all applicable provisions of the City’s ordinances regulating water quality and storm water; the Federal Water Pollution Control Act (33 U.S.C. § 1251, et seq.); the California Porter-Cologne Water Quality Control Act (Water Code § 13000 et seq.); and any and all regulations, policies, or permits issued pursuant to any such authority. Consultant must additionally comply with the lawful requirements of the City, and any other municipality, drainage district, or other local agency with jurisdiction over the location where the Services are to be conducted, regulating water quality and storm water discharges. City may seek damages from Consultant for delay in completing the Services caused by Consultant’s failure to comply with the laws, regulations and policies described in this Section, or any other relevant water quality law, regulation, or policy.

3.3.10.6 Safety. Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed.

3.3.11 Insurance.

3.3.11.1 Time for Compliance. Consultant shall not commence work under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Consultant shall not allow any subconsultant to commence work on any subcontract until it has provided evidence satisfactory to the City that the subconsultant has secured all insurance required under this section. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Agreement for cause.

Page 402 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -6- PROFESSIONAL SERVICES AGREEMENT

3.3.11.2 Types of Insurance Required. As a condition precedent to the effectiveness of this Agreement for work to be performed hereunder, and without limiting the indemnity provisions of the Agreement, the Consultant, in partial performance of its obligations under such Agreement, shall procure and maintain in full force and effect during the term of the Agreement the following policies of insurance. If the existing policies do not meet the insurance requirements set forth herein, Consultant agrees to amend, supplement or endorse the policies to do so.
(A) Commercial General Liability: Commercial General Liability Insurance which affords coverage at least as broad as Insurance Services Office "occurrence" form CG 00 01, or the exact equivalent, with limits of not less than $1,000,000 per occurrence and no less than $2,000,000 in the general aggregate. Defense costs shall be paid in addition to the limits. The policy shall contain no endorsements or provisions (1) limiting coverage for contractual liability; (2) excluding coverage for claims or suits by one insured against another (cross-liability); (3) products/completed operations liability; or (4) containing any other exclusion(s) contrary to the terms or purposes of this Agreement. (B) Automobile Liability Insurance: Automobile Liability Insurance with coverage at least as broad as Insurance Services Office Form CA 00 01 covering "Any Auto" (Symbol 1), or the exact equivalent, covering bodily injury and property damage for all activities with limits of not less than $1,000,000 combined limit for each occurrence. (C) Workers' Compensation: Workers' Compensation
Insurance, as required by the State of California and Employer's Liability Insurance with a limit of not less than $1,000,000 per accident for bodily injury and disease. (D) Professional Liability (Errors & Omissions): Professional Liability insurance or Errors & Omissions insurance appropriate to Consultant’s profession with limits of not less than $1,000,000. Covered professional services shall specifically include all work to be performed under the Agreement and delete any exclusions that may potentially affect the work to be performed (for example, any exclusions relating to lead, asbestos, pollution, testing, underground storage tanks, laboratory analysis, soil work, etc.). If coverage is written on a claims-made basis, the retroactive date shall precede the effective date of the initial Agreement and continuous coverage will be maintained or an extended reporting period will be exercised for a period of at least five (5) years from termination or expiration of this Agreement.

3.3.11.3 Insurance Endorsements. Required insurance policies shall contain the following provisions, or Consultant shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
(A) Commercial General Liability: (1) Additional Insured: The City, its officials, officers, employees, agents, and volunteers shall be additional insureds with regard to liability and defense of suits or claims arising out of the performance of the Agreement.

Additional Insured Endorsements shall not (1) be restricted to "ongoing operations"; (2) exclude "contractual liability"; (3) restrict coverage to "sole" liability of Consultant; or (4) contain any other exclusions contrary to the terms or purposes of this Agreement. For all policies of Commercial General Liability insurance, Consultant shall provide endorsements in the form of ISO CG 20 10 10 01 and 20 37 10 01 (or endorsements providing the exact same coverage) to effectuate this requirement. (2) Cancellation: Required insurance policies shall not be canceled or the coverage

Page 403 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -7- PROFESSIONAL SERVICES AGREEMENT
reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (B) Automobile Liability. (1) Cancellation: Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium.
(C) Professional Liability (Errors & Omissions): (1) Cancellation:

Required insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (2) Contractual Liability Exclusion Deleted: This insurance shall include contractual liability applicable to this Agreement. The policy must “pay on behalf of” the insured and include a provision establishing the insurer’s duty to defend. (D) Workers' Compensation: (1) Cancellation: Required
insurance policies shall not be canceled or the coverage reduced until a thirty (30) day written notice of cancellation has been served upon the City except ten (10) days shall be allowed for non-payment of premium. (2) Waiver of Subrogation: A waiver of subrogation stating that the insurer waives all rights of subrogation against the City, its officials, officers, employees, agents, and volunteers.

3.3.11.4 Primary and Non-Contributing Insurance. All policies of Commercial General Liability and Automobile Liability insurance shall be primary and any other insurance, deductible, or self-insurance maintained by the City, its officials, officers, employees, agents, or volunteers shall not contribute with this primary insurance. Policies shall contain or be endorsed to contain such provisions.

3.3.11.5 Waiver of Subrogation. All required insurance coverages, except for the professional liability coverage, shall contain or be endorsed to waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.

3.3.11.6 Deductibles and Self-Insured Retentions. Any deductible or selfinsured retention must be approved in writing by the City and shall protect the City, its officials, officers, employees, agents, and volunteers in the same manner and to the same extent as they would have been protected had the policy or policies not contained a deductible or self-insured retention.

3.3.11.7 Evidence of Insurance. The Consultant, concurrently with the execution of the Agreement, and as a condition precedent to the effectiveness thereof, shall deliver either certified copies of the required policies, or original certificates on forms approved by the City, together with all endorsements affecting each policy. Required insurance policies shall not be in compliance if they include any limiting provision or endorsement that has not been submitted to the City for approval. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15 days) prior to the expiration of any such policy, evidence of insurance showing that

Page 404 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -8- PROFESSIONAL SERVICES AGREEMENT
such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced and not replaced immediately so as to avoid a lapse in the required coverage, Consultant shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies.

3.3.11.8 Acceptability of Insurers. Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A:VII and authorized to transact business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.

3.3.11.9 Enforcement of Agreement Provisions (non estoppel).

Consultant acknowledges and agrees that actual or alleged failure on the part of the City to inform Consultant of non-compliance with any requirement imposes no additional obligation on the City nor does it waive any rights hereunder.

3.3.11.10 Requirements Not Limiting. Requirement of specific coverage or minimum limits contained in this Section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance.

3.3.11.11 Additional Insurance Provisions
(A) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Consultant, and any approval of said insurance by the City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Consultant pursuant to this Agreement, including but not limited to, the provisions concerning indemnification.
(B) If at any time during the life of the Agreement, any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement.
(C) The City may require the Consultant to provide complete copies of all insurance policies in effect for the duration of the Project. (D) Neither the City nor any of its officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement.
(E) The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Consultant from liability in excess of such coverage, nor shall it limit the Consultant’s indemnification obligations to the City and shall not preclude the City from taking such other actions available to the City under other provisions of the Agreement or law.

Page 405 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -9- PROFESSIONAL SERVICES AGREEMENT
(F) Consultant shall report to the City, in addition to Consultant’s insurer, any and all insurance claims submitted by Consultant in connection with the Services under this Agreement.

3.3.11.12 Insurance for Subconsultants. Consultant shall include all subconsultants engaged in any work for Consultant relating to this Agreement as additional insureds under the Consultant's policies, or the Consultant shall be responsible for causing subconsultants to purchase the appropriate insurance in compliance with the terms of these Insurance Requirements, including adding the City, its officials, officers, employees, agents, and volunteers as additional insureds to the subconsultant's policies. All policies of Commercial General Liability insurance provided by Consultant’s subconsultants performing work relating to this Agreement shall be endorsed to name the City, its officials, officers, employees, agents and volunteers as additional insureds using endorsement form ISO CG 20 38 04 13 or an endorsement providing equivalent coverage. Consultant shall not allow any subconsultant to commence work on any subcontract relating to this Agreement until it has received satisfactory evidence of subconsultant’s compliance with all insurance requirements under this Agreement, to the extent applicable. The Consultant shall provide satisfactory evidence of compliance with this section upon request of the City.

3.4 Labor Code Requirements.

3.4.1 Prevailing Wages. Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. If the Services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. City shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant's principal place of business and at the project site. It is the intent of the parties to effectuate the requirements of sections 1771, 1774, 1775, 1776, 1777.5, 1813, and 1815 of the Labor Code within this Agreement, and Consultant shall therefore comply with such Labor Code sections to the fullest extent required by law. Consultant shall defend, indemnify and hold the City, its officials, officers, employees, agents, and volunteers free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.

3.4.2 Registration/DIR Compliance. If the Services are being performed on a public works project of over $25,000 when the project is for construction, alteration, demolition, installation, or repair work, or a public works project of over $15,000 when the project is for maintenance work, in addition to the foregoing, then pursuant to Labor Code sections 1725.5 and 1771.1, the Consultant and all subconsultants must be registered with the Department of Industrial Relations (“DIR”). Consultant shall maintain registration for the duration of the Project and require the same of any subconsultants.

3.4.3 Compliance Monitoring. This Project may also be subject to compliance monitoring and enforcement by the DIR. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements, including the submission of payroll

Page 406 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -10- PROFESSIONAL SERVICES AGREEMENT
records directly to the DIR. Any stop orders issued by the DIR against Consultant or any subconsultant that affect Consultant’s performance of services, including any delay, shall be Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Consultant caused delay and shall not be compensable by the City. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against Consultant or any subconsultant.

3.4.4 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.

3.5 Termination of Agreement.

3.5.1.1 Grounds for Termination. City may, by written notice to Consultant, terminate the whole or any part of this Agreement at any time and without cause by giving written notice to Consultant of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Upon termination, Consultant shall be compensated only for those Services which have been adequately rendered to City, and Consultant shall be entitled to no further compensation. Consultant may not terminate this Agreement except for cause. The rights and remedies of the City provided in this section shall not be exclusive and are in addition to any other rights and remedies provided by law, equity or under this Agreement.

3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of Services under this Agreement. Consultant shall be required to provide such document and other information within fifteen (15) days of the request.

3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

3.6 Indemnification.

3.6.1 To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s Services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses except such loss or damage caused by the sole negligence or willful misconduct of the City. Consultant's obligation to indemnify shall survive expiration or termination of this Agreement and shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or

Page 407 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -11- PROFESSIONAL SERVICES AGREEMENT
volunteers.

3.6.2 If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance as a “design professional” (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.

3.7 General Provisions.

3.7.1 Accounting Records. Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

3.7.2 Independent Contractors and Subcontracting.

3.7.2.1 Use of Consultants. Consultant is aware of statutory and case law regarding classification of workers as independent contractors, including California Labor Code Section 2750.3 and Dynamex Operations West, Inc. v. Superior Court, 4 Cal. 5th 903 (2018). To ensure that Consultant is in compliance with the California Labor Code, Consultant shall only utilize its employees to provide the Services. Consultant may not provide the services through any independent contractor, subcontractor or subconsultant (“Subcontractor(s)”) unless approved by the City as set forth in Section 3.7.2.2 below. Consultant represents and warrants that all personnel who perform the Services on Consultant’s behalf are Consultant’s employees, and that Consultant complies with all applicable laws, rules and regulations governing its employees, including, but not limited to, the California Labor Code, Unemployment Insurance Code and all applicable Industrial Welfare Commission Wage Orders.

3.7.2.2 Prior Approval Required. Consultant shall not use any Subcontractor to provide the Services, or any portion of the work required by this Agreement, without prior written approval of City. In the event that City authorizes Consultant to use a Subcontractor, Consultant shall enter into a written agreement with the Subcontractor, which must include all provisions of the Agreement, including a restriction on the Subcontractor’s use of further independent contractors, subcontractors or subconsultants without the City’s prior written consent.

3.7.3 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:

Consultant: Water Works Engineers, LLC.
21515 Hawthorne Blvd., Suite 590
Torrance, CA 90503 ATTN: Andrew Borgic

Page 408 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -12- PROFESSIONAL SERVICES AGREEMENT
City: City of Coachella
53462 Enterprise Way
Coachella, CA 92236
ATTN: Castulo Estrada
Such notice shall be deemed made when personally delivered or when mailed, forty-eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.7.4 Ownership of Materials and Confidentiality.

3.7.4.1 Documents & Data; Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). All Documents & Data shall be and remain the property of City, and shall not be used in whole or in substantial part by Consultant on other projects without the City’s express written permission. Within thirty (30) days following the completion, suspension, abandonment or termination of this Agreement, Consultant shall provide to City reproducible copies of all Documents & Data, in a form and amount required by City. City reserves the right to select the method of document reproduction and to establish where the reproduction will be accomplished. The reproduction expense shall be borne by City at the actual cost of duplication. In the event of a dispute regarding the amount of compensation to which the Consultant is entitled under the termination provisions of this Agreement, Consultant shall provide all Documents & Data to City upon payment of the undisputed amount. Consultant shall have no right to retain or fail to provide to City any such documents pending resolution of the dispute. In addition, Consultant shall retain copies of all Documents & Data on file for a minimum of fifteen (15) years following completion of the Project, and shall make copies available to City upon the payment of actual reasonable duplication costs. Before destroying the Documents & Data following this retention period, Consultant shall make a reasonable effort to notify City and provide City with the opportunity to obtain the documents.

3.7.4.2 Subconsultants. Consultant shall require all subconsultants to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subconsultant prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or its subconsultants, or those provided to Consultant by the City.

3.7.4.3 Right to Use. City shall not be limited in any way in its use or reuse of the Documents and Data or any part of them at any time for purposes of this Project or another project, provided that any such use not within the purposes intended by this Agreement or on a project other than this Project without employing the services of Consultant shall be at City’s sole risk. If City uses or reuses the Documents & Data on any project other than this Project, it shall remove the Consultant’s seal from the Documents & Data and indemnify and hold harmless Consultant and its officers, directors, agents and employees from claims arising out of the negligent use or re-use of the Documents & Data on such other project. Consultant shall be

Page 409 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -13- PROFESSIONAL SERVICES AGREEMENT
responsible and liable for its Documents & Data, pursuant to the terms of this Agreement, only with respect to the condition of the Documents & Data at the time they are provided to the City upon completion, suspension, abandonment or termination. Consultant shall not be responsible or liable for any revisions to the Documents & Data made by any party other than Consultant, a party for whom the Consultant is legally responsible or liable, or anyone approved by the Consultant.

3.7.4.4 Indemnification. Consultant shall defend, indemnify and hold the City, its directors, officials, officers, employees, volunteers and agents free and harmless, pursuant to the indemnification provisions of this Agreement, for any alleged infringement of any patent, copyright, trade secret, trade name, trademark, or any other proprietary right of any person or entity in consequence of the use on the Project by City of the Documents & Data, including any method, process, product, or concept specified or depicted.

3.7.4.5 Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents & Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant. Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the Services. Nor shall such materials be disclosed to any person or entity not connected with the performance of the Services or the Project. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential. Consultant shall not use City's name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City.

3.7.4.6 Confidential Information. The City shall refrain from releasing Consultant’s proprietary information ("Proprietary Information") unless the City's legal counsel determines that the release of the Proprietary Information is required by the California Public Records Act or other applicable state or federal law, or order of a court of competent jurisdiction, in which case the City shall notify Consultant of its intention to release Proprietary Information.

Consultant shall have five (5) working days after receipt of the release notice to give City written notice of Consultant's objection to the City's release of Proprietary Information. Consultant shall indemnify, defend and hold harmless the City, and its officers, directors, employees, and agents from and against all liability, loss, cost or expense (including attorney’s fees) arising out of a legal action brought to compel the release of Proprietary Information. City shall not release the Proprietary Information after receipt of an objection notice unless either: (1) Consultant fails to fully indemnify, defend (with City's choice of legal counsel), and hold City harmless from any legal action brought to compel such release; and/or (2) a final and non-appealable order by a court of competent jurisdiction requires that City release such information.

3.7.5 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.

3.7.6 Entire Agreement. This Agreement contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements.

Page 410 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -14- PROFESSIONAL SERVICES AGREEMENT

3.7.7 Attorneys’ Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party reasonable attorneys’ fees and all costs of such action.

3.7.8 Governing Law. This Agreement shall be governed by the laws of the State of California. Venue shall be in Riverside County. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, claims and/or changed conditions, Consultant must comply with the claim procedures set forth in Government Code sections 900 et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, claims, and/or changed conditions have been followed by Consultant. If no such Government Code claim is submitted, or if any prerequisite contractual requirements are not otherwise satisfied as specified herein, Consultant shall be barred from bringing and maintaining a valid lawsuit against the City.

3.7.9 Time of Essence. Time is of the essence for each and every provision of this Agreement.

3.7.10 City's Right to Employ Other Consultants. City reserves right to employ other consultants in connection with this Project.

3.7.11 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.

3.7.12 Assignment or Transfer. Consultant shall not assign, sublet, or transfer this Agreement or any rights under or interest in this Agreement without the written consent of the City, which may be withheld for any reason. Any attempt to so assign or so transfer without such consent shall be void and without legal effect and shall constitute grounds for termination.

Consultant shall not subcontract any portion of the Services required by this Agreement, except as expressly stated herein, without prior written approval of City. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.

3.7.13 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not work days. All references to Consultant include all personnel, employees, agents, and subconsultants of Consultant, except as otherwise specified in this Agreement. All references to City include its elected officials, officers, employees, agents, and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.

3.7.14 Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.

3.7.15 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit,

Page 411 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -15- PROFESSIONAL SERVICES AGREEMENT
privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.

3.7.16 No Third-Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.7.17 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

3.7.18 Prohibited Interests. Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Consultant further agrees to file, or shall cause its employees or subconsultants to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Services. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

3.7.19 Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.

3.7.20 Counterparts. This Agreement may be signed in counterparts, each of which shall constitute an original.

3.7.21 Survival. All rights and obligations hereunder that by their nature are to continue after any expiration or termination of this Agreement, including, but not limited to, the indemnification obligations, shall survive any such expiration or termination.

3.8 Federal Provisions. With respect to any conflict between such Federal Requirements and the terms of this Agreement and/or the provisions of state law, the more stringent requirement shall control.
[SIGNATURES ON NEXT PAGE]

Page 412 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) -16- PROFESSIONAL SERVICES AGREEMENT

SIGNATURE PAGE TO PROFESSIONAL SERVICES AGREEMENT

BETWEEN THE CITY OF COACHELLA AND
Water Works Engineers, LLC.

IN WITNESS WHEREOF, each of the Parties has caused this Agreement to be executed on the day and year first above written.

CITY OF COACHELLA Water Works Engineers, LLC.

By:

Its: Project Manager
Printed Name: Andrew Borgic
By:

Its:

Printed Name:

Approved By:

Gustavo J. Romo
City Manager
Approved as to Form:

CITY ATTORNEY
_____________________________________
City Attorney
Attest:

Angela M. Zepeda
City Clerk

Page 413 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) Exhibit “B”-1 PROFESSIONAL SERVICES AGREEMENT EXHIBIT "A"

SCOPE OF SERVICES

Page 414 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) Exhibit “B”-1 PROFESSIONAL SERVICES AGREEMENT EXHIBIT "B"

SCHEDULE OF SERVICES
August 26, 2026 to July 30, 2027

Page 415 ends

Item 11.
80237.00000\34369632.1
BB&K (2021) Exhibit “C”-1 PROFESSIONAL SERVICES AGREEMENT EXHIBIT "C"

COMPENSATION

Page 416 ends

Item 11.

Professional Engineering Design Services for Hexavalent Chromium Treatment Plants
Plan Holders
Date Company Contact
6/2/26 10:41 am AGC Plan Room
10140 Riverford Rd
Lakeside, CA 92040
Plan Room
Tel: 858-558-7444
Fax: 858-558-8444
7/9/26 8:58 am Alisto Inc
2737 N Main St, Suite 200
Walnut Creek, CA 94597
Reinaldo Freitas
Tel: 9252795000
Fax: 9252795001
5/29/26 10:54 am All American Building Services
PO Box 802586
Santa Clarita, CA 91380

ANTHONY INNABI
Tel: 3234226013
Fax: 3234226013
6/1/26 8:01 am City of Coachella Public Works
53462 Enterprise Way
Coachella, CA 92236
Itzel Barroso
Tel: 760-501-8109
6/2/26 4:50 am [email protected]
30 Technology Parkway South Suite 100
Norcross, GA 30092
Cheryl Sullivan
Tel: 800-364-2059
Fax: 866-570-8187
5/31/26 5:45 am Dodge Data & Analytics
2860 S State Hwy 161
Ste 160 #501
Grand Prairie, TX 75052
Jayalakshmi L
Tel: 413-376-7032
6/26/26 8:34 am Lawton Management LLC dba Squared Compass 9912 Charthouse Cv
Austin, TX 78730
Rodney Lee
Tel: 5712328300
6/4/26 10:52 am MSA Consulting
34200 Bob Hope Drive
Rancho Mirage, CA 92270
Bridgette Rowe
Tel: 760-320-9811
6/4/26 4:45 pm NCS Engineers
202 E Earll Dr Ste 110
Phoenix, AZ 85012
David Colangelo
Tel: 3156634418 Admin
Business Development Manager
President
Assistant Engineer
SCM
Director, Business Advisory
Contracts Administrator
National Director, Business Development
8/5/26, 1:25 PM Professional Engineering Design Services for Hexavalent Chromium Treatment Plants :: Plan Holders :: PlanIT Online Planroom https://www.planitplanroom.com/projects/1497/plan-holders/professional-engineering-design-services-for-hexavalent-chromium-treatment-plants 1/2

Page 417 ends

Item 11.

Date Company Contact
6/23/26 11:19 am Northern Digital, Inc.
4701 Corporate Court
Bakersfield, CA 93311
Johnny Balderas
Tel: 6613226044
6/1/26 6:09 pm Power Grid Solutions llc
79-885 Camelback Dr
Bermuda Dunes, CA 92203
Jaime Espinoza
Tel: (442) 471-6851
6/2/26 11:21 pm PWXpress
1900 Coffeeport Rd
Jacksonville, FL 32208
mary miller
Tel: 4086768941
Fax: PWXpress
6/1/26 10:51 am Water Works Engineers, LLC
7500 N. Dobson Road
Suite 200
Scottsdale, AZ 85256
Jodi Wagner
Tel: 9167582783
Sales Engineer
Co-owner
8/5/26, 1:25 PM Professional Engineering Design Services for Hexavalent Chromium Treatment Plants :: Plan Holders :: PlanIT Online Planroom https://www.planitplanroom.com/projects/1497/plan-holders/professional-engineering-design-services-for-hexavalent-chromium-treatment-plants 2/2

Page 418 ends

Item 11.

STAFF REPORT
8/26/2026
TO: Honorable Mayor and City Council Members
FROM: Kendra Reif, Community Development Director
PREPARED BY: Kendra Reif, Community Development Director Captain Andres Martinez, Riverside County Sheriff
SUBJECT: Citywide Short-Term Vacation Rental Calls for Service Report STAFF RECOMMENDATION:

Staff recommends that the City Council receive and file the Citywide Short-Term Vacation Rental (STVR) annual calls for service report.

EXECUTIVE SUMMARY:

The attached reports summarize (a) the location of all registered short-term vacation rentals (STVRs) in the City of Coachella, (b) the volume of law-enforcement calls for service generated at STVR addresses over the past 12 months, (c) the reasons those calls were placed, and (d) how those calls are distributed across the city’s neighborhoods. The two reports were compiled with data from August 5, 2025 through August 10, 2026.

Key findings from the annual review of calls for service are as follows:
583 calls for service were dispatched to STR addresses during the 12-month period — 264 at licensed properties and 316 at unlicensed properties. The calls for service specifically related to STVR operations represented 3.2% of the 18,169 calls handled city-wide in the same period.

Loud music, party and noise complaints are the single largest driver: 228 calls (39% of all STR calls), including 215 coded specifically as noise disturbances.

Calls are highly concentrated. 125 of 276 licensed properties (45%) generated at least one call; 29 licensed properties generated three or more. The single highest was 84131 Palermo Ct with 13 calls.

Three reporting districts — 81A5 (Calle Larriva / Chavez / Rodriguez), 80C4 (Camino Bahia / Chichen Itza / Camino Maya) and 82D2 (Palermo Ct / Siena Ln / Torino Pl) account for 216 calls, 37% of all STR calls.

Page 419 ends

Item 12.

Unlicensed properties generated more calls in total than licensed ones (319 vs 264) and a markedly different mix, with proportionally more domestic violence, restraining-order and property-crime calls.

Method and Limitations:

Calls were linked to STVR properties by matching the CAD address (house number and street) to the address on the City’s STVR list. Matching is exact on house number and street name; calls recorded only at an intersection or with a non-standard location cannot be linked and are excluded.

A call at an STVR address does not establish that the short-term rental activity caused the call, or that the guest rather than the owner or a neighbor was involved. Owner-occupied properties are included in the STVR list.

Calls per neighborhood use Sheriff’s reporting districts, not City-designated neighborhood boundaries.

RECOMMENDED ALTERNATIVE(S):

Staff recommends that the City Council receive and file the Citywide Short-Term Vacation Rental (STVR) annual calls for service report.

ATTACHMENTS:

1. Coachella STVR CFS Summary

2. Coachella STVR

Page 420 ends

Item 12.

To: Gustavo Romo, Coachella City Manager Date: August 10, 2026 From: Captain Andres Martinez
Reference: Coachella STVR Call for Service Analysis

1. Purpose
This report summarizes (a) the location of all registered short-term rentals (STRs) in the City of Coachella, (b) the volume of law-enforcement calls for service generated at STR addresses over the past 12 months, (c) the reasons those calls were placed, and (d) how those calls are distributed across the city’s neighborhoods.

2. Key findings
• 583 calls for service were dispatched to STR addresses during the 12-month period — 264 at licensed properties and 316 at unlicensed properties. That is about 3.2% of the 18,169 calls handled city-wide in the same period.
• Loud music, party and noise complaints are the single largest driver: 228 calls (39% of all STR calls), including 215 coded specifically as noise disturbances. • Calls are highly concentrated. 125 of 276 licensed properties (45%) generated at least one call; 29 licensed properties generated three or more. The single highest was 84131 Palermo Ct with 13 calls.
• Three reporting districts — 81A5 (Calle Larriva / Chavez / Rodriguez), 80C4 (Camino Bahia / Chichen Itza / Camino Maya) and 82D2 (Palermo Ct / Siena Ln / Torino Pl) account for 216 calls, 37% of all STR calls.
• Unlicensed properties generated more calls in total than licensed ones (319 vs 264) and a markedly different mix, with proportionally more domestic violence, restraining-order and property-crime calls.

Page 421 ends

Item 12.

3. Calls for service — volume
Property group Calls Properties with ≥1 call Avg calls/property Licensed STR’s 266 125 of 276 properties (45%) 0.96
Unlicensed STR’s 316 150 of 505 properties (30%) 0.63
Total STR’s 582 275 properties 0.75
City-wide Call Volume 16,193 — —
Monthly distribution
Month Licensed Unlicensed Total
2025 – August 19 24 43
2025 – September 14 15 29
2025 – October 12 21 33
2025 – November 23 17 40
2025 – December 22 22 44
2026 – January 27 27 54
2026 – February 16 37 53
2026 – March 28 32 60
2026 – April 15 21 36
2026 – May 26 33 59
2026 – June 32 24 56
2026 – July 28 46 74
Volume is year-round rather than festival-only. The highest single month was July 2026 (74 calls) and the lowest was September 2025 (29 calls).

5. Reasons for calls
Reason category Licensed Unlicensed Total Share
Loud music / party / noise 151 77 228 39%
Other disturbances (arguments, unknown trouble) 21 44 65 11% Suspicious activity / alarms / area checks 22 38 60 10% Administrative / assist / follow-up 17 37 54 9%
Domestic / family violence & restraining orders 10 41 51 9% Welfare / medical / mental health 13 25 38 7%
Other / miscellaneous 13 17 30 5%
Property crime (burglary, theft, vandalism, fraud) 7 20 27 5% Traffic / parking 7 12 19 3%
Violence / weapons 3 8 11 2%

Page 422 ends

Item 12.

6. Calls per neighborhood
The Sheriff’s Department records location by reporting district. The principal streets in each district are listed to identify the neighborhood for reference.

STR’s Calls Volume
Principal streets Total Lic. Unlic. Total
Calle Larriva, Calle Chavez, Calle Rodriguez 40 86 9 95 Camino Bahia Av, Chichen Itza Rd, Camino Maya 29 28 47 76 Palermo Ct, Siena Ln, Torino Pl 19 38 8 46
San Mateo Av, Chiriaco Summit St, Pinto Ln 21 10 25 35
Lapis Dr, Nicklecreek Dr, Shadowrock Dr 6 11 19 30
Calle Leandro, Calle Diego, Calle Gregorio 6 0 29 29
San Capistrano Dr, San Solano Rd, Calle Tolosa 18 12 17 29 Paseo Barcelona, Paseo Cadiz, Paseo Cordova 14 14 14 28 Corte Solis, Avenida Verano, Calle Ocaso 15 10 9 19
Camino Coras, Avenida San Domingo, Camino Magdalena 9 10 7 17 Fiesta Rd, Sierra St, Calendula Av 7 3 12 15
Avenida Raylynn, Avenida Aleenah, Avenida Grace 7 0 15 15 Nelson St 1 0 14 14
Capitola Av, Miramar Ct, Catalina Av 9 7 6 13
Corte Percebe, Redondo Sur, Corte Molino 6 1 11 12
The 15 districts above account for 472 of 583 STR calls (81%). STR calls were recorded in 39 districts in total.

7. Highest-volume STR addresses
Address Status Calls
52798 Calle Leandro Unlicensed 19
52300 Nelson Ave Unlicensed 14
84131 Palermo Ct Licensed 13
83680 Lapis Dr Unlicensed 10
83001 Camino Bahia Unlicensed 9
83560 Lapis Dr Licensed 9
48974 Chichen Itza Rd Licensed 9
84431 Calle Larriva Licensed 8
84464 Calle Larriva Licensed 7
83537 Lapis Dr Unlicensed 7
84167 Fiesta Rd Unlicensed 7
48399 Camino Maya Unlicensed 7
84459 Calle Chavez Licensed 6
50062 Paseo Cordova Unlicensed 6
84434 Calle Chavez Licensed 6
These 15 addresses account for 137 calls — 24% of all STR calls — at 15 of the 781 STR properties identified citywide.

Page 423 ends

Item 12.

8. Method and limitations
• Calls were linked to STR properties by matching the CAD address (house number and street) to the address on the City’s STR list. Matching is exact on house number and street name; calls recorded only at an intersection or with a non-standard location cannot be linked and are excluded.
• A call at an STR address does not establish that the short-term rental activity caused the call, or that the guest rather than the owner or a neighbor was involved. Owner-occupied properties are included in the STR list.
• Calls per neighborhood use Sheriff’s reporting districts, not City-designated neighborhood boundaries.

Page 424 ends

Item 12.

APN License # Address Unit Number Zone
768521007 TOT-000305 84131 Palermo Ct Coachella CA 92236 Coachella 612460028 TOT-000359 83560 Lapis Dr Coachella CA 92236 Coachella 612520031 TOT-000370 48974 Chichen Itza Rd Coachella CA 92236 Coachella 768500004 A-000000423 84431 Calle Larriva Coachella CA 92236 Coachella 768510007 TOT-000274 84464 Calle Larriva Coachella CA 92236 Coachella 768502008 TOT-000012 84434 Calle Chavez Coachella CA 92236 Coachella 768510011 TOT-000275 84459 Calle Chavez Coachella CA 92236 Coachella 768521023 TOT-000075 53032 Torino Pl Coachella CA 92236 Coachella 768010011 A-000000520 84026 Calle Granada Coachella CA 92236 Coachella 778472018 A-000000544 52324 Catarina Ct Coachella CA 92236 Coachella 779300028 A-000000569 50145 Camino Coras Coachella CA 92236 Coachella 768111023 TOT-000189 50740 Tabasco Coachella CA 92236 Coachella 768482022 TOT-000358 84210 Miramar Ct Coachella CA 92236 Coachella 768500023 TOT-000352 84420 Calle Rodriguez Coachella CA 92236 Coachella 768503005 TOT-000347 84421 Calle Chavez Coachella CA 92236 Coachella 768510030 TOT-000166 50508 Calle Cervantes Coachella CA 92236 Coachella 768501002 TOT-000033 84447 Calle Rodriguez Coachella CA 92236 Coachella 768500027 TOT-000126 84442 Calle Rodriguez Coachella CA 92236 Coachella 768021003 TOT-000338 50271 Paseo Cadiz Coachella CA 92236 Coachella 768511002 TOT-000168 50567 Calle Cebrino Coachella CA 92236 Coachella 779291002 TOT-000301 50289 San Capistrano Dr Coachella CA 92236 Coachella 768501010 A-000000576 84442 Calle Ysiano Coachella CA 92236 Coachella 603532022 A-000000590 48580 Calle Tecomaria Coachella CA 92236 Coachella 768460024 TOT-000372 84103 Siena Ln Coachella CA 92236 Coachella 612503020 A-000000574 48605 Camino Las Brisas Coachella CA 92236 Coachella 603525002 TOT-000343 84120 Avenida Europa Coachella CA 92236 Coachella 768511013 TOT-000288 50584 Calle Cervantes Coachella CA 92236 Coachella 768511011 TOT-000333 50656 Calle Cervantes Coachella CA 92236 Coachella 768510027 A-000000064 50502 Calle Cebrino Coachella CA 92236 Coachella 779262017 TOT-000332 50054 Calle Tolosa Coachella CA 92236 Coachella 768501009 A-000000418 84436 Calle Ysiano Coachella CA 92236 Coachella 612583006 TOT-000321 48805 Charlton Peak St Coachella CA 92236 Coachella 768460027 A-000000491 84067 Siena Ln Coachella CA 92236 Coachella 612611017 A-000000568 83777 Corte Solis Coachella CA 92236 Coachella 768520022 TOT-000304 53039 Modena Ter Coachella CA 92236 Coachella 768511014 A-000000417 50564 Calle Cervantes Coachella CA 92236 Coachella 768490019 A-000000114 84310 Catalina Ave Coachella CA 92236 Coachella 612590032 A-000000428 49282 Pluma Verde Pl Coachella CA 92236 Coachella 612590042 TOT-000361 83357 Pluma Dorada Ct Coachella CA 92236 Coachella 779271015 A-000000571 Unit B: 50133 Camino Convento Coachella CA 92236 B Coachella 768022003 TOT-000007 50223 Paseo Barcelona Coachella CA 92236 Coachella 612520022 TOT-000028 48939 Camino Cortez Coachella CA 92236 Coachella 768511006 TOT-000357 50707 Calle Cebrino Coachella CA 92236 Coachella 612602045 A-000000597 83777 Corte Estivo Coachella CA 92236 Coachella 768280003 A-000000245 52142 Allende Dr Coachella CA 92236 Coachella 612581018 TOT-000310 83628 Mecca Hills Ave Coachella CA 92236 Coachella

Page 425 ends

Item 12.
612431009 A-000000527 48068 Luna De Nicoleta St Coachella CA 92236 Coachella 612521003 A-000000585 48824 Camino Cortez Coachella CA 92236 Coachella 768510020 TOT-000264 50658 Calle Cebrino Coachella CA 92236 Coachella 612541007 A-000000467 83175 El Greco Ave Coachella CA 92236 Coachella 768520032 TOT-000154 53006 Modena Ter Coachella CA 92236 Coachella 768460016 TOT-000271 53045 Modena Ter Coachella CA 92236 Coachella 768500011 TOT-000300 50845 Calle Carrasco Coachella CA 92236 Coachella 768501006 A-000000514 84425 Calle Rodriguez Coachella CA 92236 Coachella 612532012 TOT-000360 83157 Todos Santos Ave Coachella CA 92236 Coachella 768520045 A-000000570 53019 Torino Pl Coachella CA 92236 Coachella 612510027 TOT-000261 83454 Todos Santos Ave Coachella CA 92236 Coachella 779301017 TOT-000348 83531 Avenida San Domingo Coachella CA 92236 Coachella 612544013 A-000000493 48665 El Castillo Rd Coachella CA 92236 Coachella 612530020 A-000000319 48999 Playa Del Amor Coachella CA 92236 Coachella 768501011 A-000000416 84446 Calle Ysiano Coachella CA 92236 Coachella 768272003 A-000000550 52043 Primitivo Dr Coachella CA 92236 Coachella 768010015 A-000000586 84052 Calle Granada Coachella CA 92236 Coachella 612461025 TOT-000344 83645 Lapis Dr Coachella CA 92236 Coachella 612583012 A-000000501 83503 San Mateo Ave Coachella CA 92236 Coachella 768020034 A-000000506 50253 Paseo Barcelona Coachella CA 92236 Coachella 768460013 TOT-000322 84044 Bellissima Ave Coachella CA 92236 Coachella 779271040 TOT-000364 50298 Camino Magdalena Coachella CA 92236 Coachella 768111022 A-000000221 50745 Tabasco Coachella CA 92236 Coachella 612571031 A-000000598 83637 Granite Pass Trl Coachella CA 92236 Coachella 603443017 A-000000478 84184 Fiesta Rd Coachella CA 92236 Coachella 603441018 A-000000504 49069 Summer St Coachella CA 92236 Coachella 778410008 A-000000397 85214 Corte Del Roble Coachella CA 92236 Coachella 612510006 TOT-000266 83437 Agua Blanca St Coachella CA 92236 Coachella 768521006 TOT-000351 84123 Palermo Ct Coachella CA 92236 Coachella 768501004 A-000000427 84435 Calle Rodriguez Coachella CA 92236 Coachella 779300030 A-000000515 50142 Camino Coras Coachella CA 92236 Coachella 779293018 TOT-000061 83437 San Asis Dr Coachella CA 92236 Coachella 612602020 A-000000573 83833 Corte Eclipse Coachella CA 92236 Coachella 612574014 A-000000607 48623 Charlton Peak St Coachella CA 92236 Coachella 768500026 A-000000503 84438 Calle Rodriguez Coachella CA 92236 Coachella 779291012 A-000000546 50262 Calle Tolosa Coachella CA 92236 Coachella 612611044 TOT-000076 83766 Corte Solis Coachella CA 92236 Coachella 612571020 TOT-000074 48456 Red Mountain Pl Coachella CA 92236 Coachella 768520031 TOT-000335 53005 Modena Ter Coachella CA 92236 Coachella 612584002 A-000000265 83585 Mecca Hills Ave Coachella CA 92236 Coachella 779620009 TOT-000307 50677 Paseo Cisneros Coachella CA 92236 Coachella 768500009 TOT-000153 50905 Calle Carrasco Coachella CA 92236 Coachella 779293011 A-000000129 83391 San Asis Dr Coachella CA 92236 Coachella 779293014 TOT-000016 83411 San Asis Dr Coachella CA 92236 Coachella 612611020 A-000000519 83819 Corte Solis Coachella CA 92236 Coachella 612453020 TOT-000341 83589 Shadowrock Dr Coachella CA 92236 Coachella 768503003 TOT-000021 84435 Calle Chavez Coachella CA 92236 Coachella

Page 426 ends

Item 12.
768483033 TOT-000230 84198 Capitola Ave Coachella CA 92236 Coachella 697320062 A-000000134 86177 Sonoma Creek Rd Coachella CA 92236 Coachella 768521027 TOT-000060 84136 Siena Ln Coachella CA 92236 Coachella 768501001 A-000000587 84453 Calle Rodriguez Coachella CA 92236 Coachella 768111015 A-000000199 50855 Chiapas Dr Coachella CA 92236 Coachella 768460014 TOT-000309 53055 Modena Ter Coachella CA 92236 Coachella 779262006 A-000000510 50159 San Capistrano Dr Coachella CA 92236 Coachella 768510009 TOT-000187 84452 Calle Larriva Coachella CA 92236 Coachella 603570001 TOT-000355 49896 Calle Quinterra Coachella CA 92236 Coachella 778400006 A-000000606 53910 Calle Balderas Coachella CA 92236 Coachella 768030012 A-000000446 50180 Goya Dr Coachella CA 92236 Coachella 768503008 A-000000236 84434 Calle Larriva Coachella CA 92236 Coachella 768510004 A-000000420 84451 Calle Larriva Coachella CA 92236 Coachella 768101004 A-000000206 50485 Jalisco Ave Coachella CA 92236 Coachella 768521019 TOT-000237 53016 Torino Pl Coachella CA 92236 Coachella 697320068 A-000000438 44452 Masson Dr Coachella CA 92236 Coachella 612510015 A-000000142 83473 Agua Blanca St Coachella CA 92236 Coachella 612581021 A-000000414 83670 Mecca Hills Ave Coachella CA 92236 Coachella 612600007 A-000000433 83763 Avenida Verano Coachella CA 92236 Coachella 768521017 TOT-000363 84129 Monza Ln Coachella CA 92236 Coachella 612600003 A-000000445 Unit ADU: 83819 Avenida Verano Coachella CA 92236 ADU Coachella 768503006 A-000000156 84422 Calle Larriva Coachella CA 92236 Coachella 768502001 A-000000389 84447 Calle Ysiano Coachella CA 92236 Coachella 779293013 A-000000456 83405 San Asis Dr Coachella CA 92236 Coachella 612441014 A-000000538 83391 Camino Bonito Ave Coachella CA 92236 Coachella 612602016 A-000000432 83777 Corte Eclipse Coachella CA 92236 Coachella 603454025 TOT-000314 84126 Calendula Ave Coachella CA 92236 Coachella 768021015 TOT-000263 50230 Paseo Barcelona Coachella CA 92236 Coachella 603525009 TOT-000368 84095 Avenida Cedrus Coachella CA 92236 Coachella 768022002 TOT-000121 50229 Paseo Barcelona Coachella CA 92236 Coachella 768510014 A-000000400 84481 Calle Chavez Coachella CA 92236 Coachella 779290012 A-000000288 50264 San Capistrano Dr Coachella CA 92236 Coachella 779300039 A-000000486 50247 Camino El Faro Coachella CA 92236 Coachella 612583003 A-000000190 48727 Charlton Peak St Coachella CA 92236 Coachella 697320037 TOT-000284 44471 Duckhorn Dr Coachella CA 92236 Coachella 768511008 TOT-000115 84460 Calle Chavez Coachella CA 92236 Coachella 768520057 TOT-000327 84172 Monza Ln Coachella CA 92236 Coachella 612611021 A-000000551 83833 Corte Solis Coachella CA 92236 Coachella 768282001 TOT-000328 52105 Malvasia Way Coachella CA 92236 Coachella 768500006 A-000000422 84415 Calle Larriva Coachella CA 92236 Coachella 768313009 A-000000306 84460 Indigo Ct Coachella CA 92236 Coachella 778403039 A-000000395 53881 Calle Ruiz Coachella CA 92236 Coachella 768500012 TOT-000025 50803 Calle Carrasco Coachella CA 92236 Coachella 768370011 A-000000093 84561 Calle Diego Coachella CA 92236 Coachella 779620010 TOT-000308 50691 Paseo Cisneros Coachella CA 92236 Coachella 603525008 A-000000495 84096 Avenida Europa Coachella CA 92236 Coachella 603551002 A-000000554 49660 Washingtonia Ave Coachella CA 92236 Coachella

Page 427 ends

Item 12.
612460010 TOT-000346 Unit 1: 49390 Copperidge St Coachella CA 92236 1 Coachella 778472019 A-000000528 52292 Catarina Ct Coachella CA 92236 Coachella 697320029 A-000000232 44458 Duckhorn Dr Coachella CA 92236 Coachella 612440006 TOT-000345 83390 La Costa Ave Coachella CA 92236 Coachella 779300012 A-000000522 50331 Camino Loreto Coachella CA 92236 Coachella 612540017 A-000000541 83198 El Greco Ave Coachella CA 92236 Coachella 612590022 A-000000487 49011 Pluma Verde Pl Coachella CA 92236 Coachella 768283003 A-000000178 84521 Malvasia Way Coachella CA 92236 Coachella 779290003 A-000000440 50317 San Solano Rd Coachella CA 92236 Coachella 768021013 A-000000529 50218 Paseo Barcelona Coachella CA 92236 Coachella 779262011 TOT-000043 50210 Calle Tolosa Coachella CA 92236 Coachella 778452025 A-000000370 85926 Avenida Raylynn Coachella CA 92236 Coachella 612510032 A-000000578 83474 Todos Santos Ave Coachella CA 92236 Coachella 768320008 TOT-000276 53913 W Sienna Cir Coachella CA 92236 Coachella 768313011 A-000000247 84471 N Sienna Cir Coachella CA 92236 Coachella 768200030 TOT-000191 50782 Sunburst St Coachella CA 92236 Coachella 612503042 A-000000589 83283 Pueblo Bonito Coachella CA 92236 Coachella 768140012 A-000000468 50671 Avenida Razon Coachella CA 92236 Coachella 612581038 A-000000594 83684 San Mateo Ave Coachella CA 92236 Coachella 612503011 A-000000380 48439 Agua Caliente St Coachella CA 92236 Coachella 779620002 A-000000601 50539 Paseo Cisneros Coachella CA 92236 Coachella 779291008 A-000000593 50366 Calle Tolosa Coachella CA 92236 Coachella 768361002 A-000000552 52856 Calle Diego Coachella CA 92236 Coachella 612531022 A-000000492 48847 El Arco St Coachella CA 92236 Coachella 768483006 A-000000548 51298 Monarch Rd Coachella CA 92236 Coachella 768520026 A-000000388 53023 Modena Ter Coachella CA 92236 Coachella 779261014 TOT-000293 50134 San Capistrano Dr Coachella CA 92236 Coachella 779621012 TOT-000317 83763 Calle Moreno Coachella CA 92236 Coachella 612611009 A-000000532 83850 Corte Estivo Coachella CA 92236 Coachella 778411016 A-000000473 85233 Avenida Tacuba Coachella CA 92236 Coachella 612241012 A-000000565 83489 Camino Pelicano Coachella CA 92236 Coachella 779300005 A-000000376 50322 Camino Loreto Coachella CA 92236 Coachella 612460037 A-000000482 Unit ADU: 83668 Lapis Dr Coachella CA 92236 ADU Coachella 612574007 TOT-000365 48441 Charlton Peak St Coachella CA 92236 Coachella 612590040 A-000000401 83329 Pluma Dorada Ct Coachella CA 92236 Coachella 768521031 A-000000509 84184 Siena Ln Coachella CA 92236 Coachella 612602056 A-000000496 83935 Corte La Morada Coachella CA 92236 Coachella 779620016 TOT-000369 83796 Calle Moreno Coachella CA 92236 Coachella 612530001 A-000000384 Unit ADU: 83241 Camino Bahia Coachella CA 92236 ADU Coachella 603560019 A-000000408 49629 Calle Quinterra Coachella CA 92236 Coachella 603571001 TOT-000367 49710 Redondo Este Coachella CA 92236 Coachella 612521013 A-000000600 83454 Puerto Escondido Coachella CA 92236 Coachella 697320066 A-000000560 44460 Masson Dr Coachella CA 92236 Coachella 778415002 A-000000083 85233 Avenida Yucateco Coachella CA 92236 Coachella 778400005 TOT-000280 53918 Calle Balderas Coachella CA 92236 Coachella 612583007 A-000000392 48831 Charlton Peak St Coachella CA 92236 Coachella 768140004 TOT-000334 50622 Avenida Razon Coachella CA 92236 Coachella

Page 428 ends

Item 12.
779293007 A-000000244 83386 San Asis Dr Coachella CA 92236 Coachella 697320002 TOT-000297 86115 Arrowood Ave Coachella CA 92236 Coachella 779300009 A-000000572 50313 Camino Loreto Coachella CA 92236 Coachella 779620015 TOT-000267 83784 Calle Moreno Coachella CA 92236 Coachella 612440016 A-000000582 48104 La Playa St Coachella CA 92236 Coachella 612501016 A-000000453 48426 Agua Caliente St Coachella CA 92236 Coachella 779261016 TOT-000313 50082 San Capistrano Dr Coachella CA 92236 Coachella 768325029 A-000000458 84357 Scarlet Way Coachella CA 92236 Coachella 779300007 A-000000605 50310 Camino Loreto Coachella CA 92236 Coachella 768142013 A-000000490 84489 Via Zahidi Coachella CA 92236 Coachella 779270018 TOT-000112 83542 Avenida Campanas Coachella CA 92236 Coachella 779300040 A-000000580 50241 Camino El Faro Coachella CA 92236 Coachella 778451026 A-000000385 85930 Avenida Grace Coachella CA 92236 Coachella 768503001 TOT-000125 84447 Calle Chavez Coachella CA 92236 Coachella 612602025 A-000000143 83907 Corte El Alba Coachella CA 92236 Coachella 697320010 TOT-000296 86153 Arrowood Ave Coachella CA 92236 Coachella 768510022 TOT-000340 50582 Calle Cebrino Coachella CA 92236 Coachella 768511012 TOT-000035 50616 Calle Cervantes Coachella CA 92236 Coachella 768520009 A-000000531 53035 Calle Empalme Coachella CA 92236 Coachella 612461020 A-000000300 83585 Lapis Dr Coachella CA 92236 Coachella 779271008 A-000000108 50010 Calle Frontera Coachella CA 92236 Coachella 768270015 TOT-000323 84560 Vermouth Dr Coachella CA 92236 Coachella 778451028 A-000000505 85942 Avenida Grace Coachella CA 92236 Coachella 768511004 A-000000558 50621 Calle Cebrino Coachella CA 92236 Coachella 768140006 A-000000437 50601 Avenida Razon Coachella CA 92236 Coachella 768502002 TOT-000152 84441 Calle Ysiano Coachella CA 92236 Coachella 768470044 TOT-000337 84030 Manhattan Ave Coachella CA 92236 Coachella 779263010 A-000000363 50157 Calle Tolosa Coachella CA 92236 Coachella 768470029 A-000000441 51135 Venice Ct Coachella CA 92236 Coachella 697344006 A-000000555 45916 Meritage Ln Coachella CA 92236 Coachella 768020025 A-000000333 84077 Calle Seville Coachella CA 92236 Coachella 768020029 A-000000588 50283 Paseo Barcelona Coachella CA 92236 Coachella 768502004 A-000000158 84429 Calle Ysiano Coachella CA 92236 Coachella 612590038 TOT-000051 49237 Pluma Blanca Pl Coachella CA 92236 Coachella 612591002 TOT-000128 49190 Pluma Blanca Pl Coachella CA 92236 Coachella 603561008 A-000000595 84318 Redondo Norte Coachella CA 92236 Coachella 768273025 A-000000535 52074 Amarone Cir Coachella CA 92236 Coachella 768490036 A-000000547 51416 Newport St Coachella CA 92236 Coachella 779292005 A-000000577 50391 Calle Tolosa Coachella CA 92236 Coachella 768500022 A-000000387 84412 Calle Rodriguez Coachella CA 92236 Coachella 779300042 TOT-000100 50229 Camino El Faro Coachella CA 92236 Coachella 612453014 A-000000248 83556 Nicklecreek Dr Coachella CA 92236 Coachella 697320067 TOT-000298 44456 Masson Dr Coachella CA 92236 Coachella 768020024 TOT-000354 84087 Calle Seville Coachella CA 92236 Coachella 768312013 A-000000545 53760 Slate Dr Coachella CA 92236 Coachella 779263012 TOT-000260 50209 Calle Tolosa Coachella CA 92236 Coachella 612552001 TOT-000181 48310 San Gorgonio Pl Coachella CA 92236 Coachella

Page 429 ends

Item 12.
697320034 A-000000559 44459 Duckhorn Dr Coachella CA 92236 Coachella 612560022 TOT-000366 83645 Palomar Ct Coachella CA 92236 Coachella 612500001 A-000000489 48369 Camino Maya Coachella CA 92236 Coachella 778405013 A-000000316 85161 Avenida Reforma Coachella CA 92236 Coachella 603532011 A-000000536 48709 Calle Eldarica Coachella CA 92236 Coachella 768283015 A-000000407 84506 Rodrejo St Coachella CA 92236 Coachella 603561019 A-000000483 49823 Redondo Poniente Coachella CA 92236 Coachella 697342009 TOT-000319 86226 Pinot Noir Ln Coachella CA 92236 Coachella 768500008 A-000000343 50947 Calle Carrasco Coachella CA 92236 Coachella 778461027 A-000000186 52124 Calle Anabella Coachella CA 92236 Coachella 768022006 A-000000421 50207 Paseo Barcelona Coachella CA 92236 Coachella 768511009 TOT-000209 84454 Calle Chavez Coachella CA 92236 Coachella 768011014 TOT-000277 50061 Paseo Cordova Coachella CA 92236 Coachella 612510025 A-000000557 83446 Todos Santos Ave Coachella CA 92236 Coachella 768510016 TOT-000055 50808 Calle Cebrino Coachella CA 92236 Coachella 697320035 TOT-000285 44463 Duckhorn Dr Coachella CA 92236 Coachella 768471040 TOT-000318 84039 Laguna Ln Coachella CA 92236 Coachella 603422015 A-000000561 49130 Jazmin St Coachella CA 92236 Coachella 768020020 A-000000424 50286 Paseo Cadiz Coachella CA 92236 Coachella 612521035 TOT-000362 83457 Ixtapa Ave Coachella CA 92236 Coachella 603504042 A-000000436 49321 Hibisco St Coachella CA 92236 Coachella 612600002 TOT-000117 83833 Avenida Verano Coachella CA 92236 Coachella 779271026 A-000000539 50199 Camino Rosario Coachella CA 92236 Coachella 779291005 A-000000556 50367 San Capistrano Dr Coachella CA 92236 Coachella 612574011 A-000000542 48545 Charlton Peak St Coachella CA 92236 Coachella 768381009 A-000000107 52280 Calle Techa Coachella CA 92236 Coachella 612440005 A-000000153 48041 Estrella Pedro Coachella CA 92236 Coachella 612611010 TOT-000138 83836 Corte Estivo Coachella CA 92236 Coachella 768323002 A-000000184 84422 Scarlet Way Coachella CA 92236 Coachella 612590020 TOT-000259 49072 Pluma Verde Pl Coachella CA 92236 Coachella 779293012 A-000000157 83397 San Asis Dr Coachella CA 92236 Coachella 768510026 A-000000419 50510 Calle Cebrino Coachella CA 92236 Coachella 779293006 A-000000471 83392 San Asis Dr Coachella CA 92236 Coachella 768313012 A-000000477 84459 N Sienna Cir Coachella CA 92236 Coachella 697320043 A-000000135 86124 Sonoma Creek Rd Coachella CA 92236 Coachella 768471006 A-000000507 84073 Manhattan Ave Coachella CA 92236 Coachella 778300016 A-000000365 85451 Valencia Ln Coachella CA 92236 Coachella 779300008 TOT-000303 50307 Camino Loreto Coachella CA 92236 Coachella 612532026 A-000000360 83398 Los Cabos Ave Coachella CA 92236 Coachella 603531009 TOT-000356 48663 Calle Cantara Coachella CA 92236 Coachella 697320022 A-000000139 44473 Masson Dr Coachella CA 92236 Coachella 779293024 A-000000513 50292 San Solano Rd Coachella CA 92236 Coachella

Page 430 ends

Item 12.

Owner Owner Occupied License status
Topchyan Karapet No current
Gray Line No current
Sigman Deborah No current
Burk Living Trust Dated 1/20/07 No reviewed
Topchyan Karapet No current
Yacoubian Talin No current
Noordin Ali No current
Phelps Joseph No current
Hurtado Abel Yes returned
Sandoval Concepcion Living Trust U/A Dtd 11/8/24 No submitted Godinez Carlos Adrian Lopez No submitted
Andonian Family Rev Trust Dtd 12/17/18 No current
Felix Guadalupe Mendoza Yes current
Acosta Humberto Osuna No current
Acosta Humberto Osuna No current
Carson Corey No current
Vargas Miguel Angel Magallon No current
Koenig Mikkel No current
P236 Llc No current
Perez Anthony Moises No current
Smith Zachery No current
Rabii Kathy No submitted
Moreno Navit Yes submitted
Anabad Llc No current
Kolpak Mariya No submitted
Kumar Family Trust No current
Sanjog & Asmita Revocable Trust Dtd 12/29/25 No current Lalani Devindi Yes current
Sigman Brandon No reviewed
Calle Tolosa Prop No current
Layton-Hartman Rebecca No submitted
Moreno Isela Margarita Acosta Yes current
Gonzalez Christopher Louis No submitted
Escamilla Lilia A No submitted
Topchyan Karapet Kevin No current
Dwight Ryan No reviewed
Ortiz Julio Cesar Gomez Yes reviewed
Sigman Family Partnership No submitted
Moreno Isela Margarita Acosta No current
Palmpik No submitted
Pelleg Amir No current
Munoz Carlos V Yes current
50-707 Calle Statutory Trust No current
Verdugo Judy N No submitted
Sanchez Hector No submitted
Acuna Juan C No current

Page 431 ends

Item 12.

Delgado Genaro No submitted
Sagryan Kristine No submitted
Muradyan Siranush Yes current
Pizinger Jerome M No submitted
Koenig Mikkel N No current
Elkassis George No current
Sunshine Escapes Carrasco Llc No current
Coachella Offspring No submitted
Herrman Cary R No current
Coach Polo No submitted
Gnak Group No current
Ramseys Vacation Rental No current
Carlson Jack Jay & Mary-Ann Nancy Ness Revocable Liv No submitted Barajas Oscar No submitted
Labha Joel No reviewed
Pinedo Alejandro V Yes submitted
R-Rivas Trucking Inc No submitted
Esqueda Everardo Jimenez No current
Acosta Isela No submitted
Humbles Blake No submitted
Eda Management No current
Ruiz Alberto No current
Cbpic Ca Owner I No submitted
Coronado David R & Beth C Family Trust Dtd 03/18/26 No submitted Delgado Jose Martin Yes submitted
Morales Ruben Salvador No submitted
Tellez Benjamin No submitted
Panussi Dona Trust Dtd 11/4/22 No current
Malik Irina No current
Blackrock Hospitality No submitted
Goshorn Barbara Marie Yes reviewed
Gevorkyan Temur No current
Driga Sergey No submitted
Wilson No submitted
Acosta Isela No submitted
Perez V Manuel No submitted
Lainer Arik No current
Red Mountain Splash Retreat No current
Element Group No current
Rodriguez Heriberto Jr No submitted
Clubhouseind No current
Koenig Mikkel No current
Sanchez Adriana No reviewed
Allier Holdings No current
Lupercio Efren Martinez No submitted
Ledesma Gil Family Trust Yes current
Gal Min Ji No current

Page 432 ends

Item 12.

Leon Lorenzo Irad No current
Vineyards Casitas Llc No reviewed
Patel Shaival No current
Calle Coachella No submitted
Lunetta Nellie No reviewed
Silverstein Joseph No current
Chavez Anna L Yes submitted
Rios Jacqueline M No current
Pogsar Family Trust Dated 03/14/2019 No current
Fonseca Mario No submitted
Enriquez Jose Antonio Salmeron No submitted
Flores Monica Yes submitted
Jk Uncharted Inv No reviewed
Gonzalez Cristian No reviewed
Malik Irina No current
Guezoumian Trust Dtd 05/19/25 No reviewed
Cheysadawoot No reviewed
Shahbazyan Vazgen No submitted
Madero Fredy Yes submitted
Luo Jingharng Gene No current
Ramirez Hector R Yes submitted
Tang Jungiang Alex Yes reviewed
Lagasca Jennifer Gozun No submitted
Pompa Carlos & Dulce Family Trust U/A Dated 6/28/021 No submitted Carrillo David A Yes submitted
Ibarra Manuela Grano Yes submitted
Dabu Macrey Robert C Yes current
Copernicus No current
Figueroa Rodriguez Agustin No current
Zellmer Michael No current
Casa Tulum Llc No submitted
Mondragon Alfredo No submitted
Kao Chadwick Edward No submitted
Mendoza Rafael No reviewed
Vineyards Casitas No current
Magana Jorge No current
Kakumani Akash No current
Huazano Cesar A No submitted
52105 Malvasia Way No current
Elegance House No reviewed
Wong Realty Trust U/A Dated 11/12/19 No submitted
Greenlee Lina No submitted
Anabad Llc No current
Kamangar Kambiz No reviewed
Clubhouseind No current
Garcia Juan Diaz No reviewed
Meraz Jaime No submitted

Page 433 ends

Item 12.

Desert Breeze 2020 No current
Castellanos Jose F Yes submitted
Facon Ranell No reviewed
Staychella Prop Yes current
Cheong Vincent No submitted
Filasky Taylor No submitted
Gonzalez Family Trust No submitted
Villarreal Juan No reviewed
Garcia Jose A Yes submitted
Beltran Hernan No submitted
Nam Family Trust Dated 1/28/2023 No current
Sasek Kevin No submitted
Romero Wilber Alexander No submitted
Topchyan Karapet Kevin No current
Garcia Alberto No submitted
Andonian Family Revocable Living Trust Dtd 12/17/18 No current Ramos Oscar E No submitted
Tarango Lindsey No submitted
Bederyan Zhorzh No submitted
Frias Joey No submitted
Pulte Home Co No submitted
Padilla Matthew Steven No submitted
Fuentes Lizette Yadira No submitted
Al Manasreh Ali A No submitted
Galvez Gerardo Vargas No submitted
Krjjj Living Trust Dtd 5/29/23 No submitted
Lopez Torres Jose Israel Yes current
Mardini Nabil Marcel No current
Garcia Rogelio Salcedo Yes submitted
Guaran Living Trust Dtd 04/04/22 No submitted
Dominguez Juan Armando No submitted
Lopez Jesse Solis Yes submitted
Rivera Areli Eslaen No submitted
Acosta Humberto Osuna No current
El Dorado Of The Desert No reviewed
Garcia Florentino G Sr Yes submitted
Briceno Patricia No submitted
Heybelian Haroutioun No current
Montes Mayra Sidumy Yes submitted
Delarosa Ariel Yes submitted
Garcia Juan Aguilar No current
Chuo Joey No submitted
Do Amaral Prisciane Amelia No submitted
Garcia Luis Fernando Gutierrez Yes reviewed
Aguilera Jose Rodriguez Yes current
Rubio Jose & Gloria Living Trust No submitted
Ringel Family Trust Dated 6/22/22 No current

Page 434 ends

Item 12.

Mejorado Gil No submitted
Vineyards Casitas No current
Palmpik No submitted
Yi Ki No current
Zwagemaker Jacob No submitted
Mandujano Jose Luis No submitted
Balbuena Gerardo Yes current
Valdez Fernando Yes submitted
Quinn Sterling No submitted
Amezquita Judith Living Trust U/A Dtd 8/21/2021 Yes submitted Ghanimian Zohrab C Family Living Trust Of Aug 2022 D No current Dang Lance No submitted
Trujillo Elisafat E Lopez No submitted
84442Callechavez No current
Coachella White House No reviewed
Vineyards Casitas No current
Arenas Jennifer No current
Hauer Ashleigh No current
Parsons Martha No submitted
Barwela Leo Canero No submitted
Hernandez David Jr No reviewed
Hernandez Gabriela Munoz Revocable Living Trust 3/07 Yes current Martinez Santiago No submitted
Yervandyan Vahagn Yes expired
Lopez Isaac Rosales No submitted
Koenig Mikkel No current
Arellano Eliseo Jr No current
Johantgen Sofia No submitted
Valenzuela Edwin Moya No reviewed
Ag & Jm Success Inc No submitted
Zuidema Jeffrey Alan No reviewed
Sigman Family Partnership No submitted
Benoy Richard No reviewed
Rivera Maria Elva Yes current
Ramirez Sergio Navarro Yes current
Nak Trust Dated 9/16/2021 No submitted
52074 Amarone Circle No submitted
Huerta Victor Sanchez Yes submitted
Saldivar Kyle Yes submitted
Delgado Abigail No submitted
Najera Erica Sanchez Yes current
Solorzano Fabio G No submitted
Vineyards Casitas No current
84087 Calle Selville No current
Ramirez Dayanna Yvette No submitted
Kj Coachella 2 Llc No current
Gal Jong Bin No current

Page 435 ends

Item 12.

Amaral Prisciane Amelia Do No reviewed
Khanjyan Arman No current
Jimenez Angelica Yes submitted
Salcido Karla I No submitted
Zamora Ramiro N Yes submitted
Servin Jorge Antonio Yes reviewed
Hanson Lena No submitted
Carrillo Ivan No current
Sigman Deborah Lynne No reviewed
Corona Oscar No reviewed
Sigman Michael Christopher No submitted
84454 Calle Chavez No current
Andoun Adeline No current
Pineda Israel Yes submitted
Turek Richard L No current
Vineyards Casitas No current
Morales Julio C Espinoza No current
Morales Sasha No submitted
Arreguin Karla K No reviewed
Batres Selvin Manolo Garcia No current
Lares Amanda No submitted
Kumar Kiran Jayant Kumar Jayant No current
Dang Mina Thanh-Mi No reviewed
Maldonado Roberto No submitted
Paz Damazo Yes submitted
Mayorga Viridiana V No reviewed
Canseco Carolina Mildred No reviewed
83836 Corte Estivo No current
Guerrero Gerardo Banuelos No reviewed
Pappula Veera Reddy No current
Hernandez Steven Joseph Yes reviewed
Carreon Matthew R Living Trust Dtd 7/10/24 No submitted Delara Juan M No submitted
Ceja Marco A No submitted
Vineyards Casitas Llc No reviewed
Martinez Julio C No submitted
Aguilar Hortencia No submitted
Santaneno Olivia Ramirez No current
Aguilar Lizette No submitted
Salcedo Pasquala No current
Servin Gerardo Mendoza No reviewed
Hicks Aurora Alicia Living Trust Dtd 01/23/23 Yes submitted

Page 436 ends

Item 12.

Calls (12 mo)
13998766555444444333333333333322222222222222222

Page 437 ends

Item 12.
22222222222222211111111111111111111111111111111

Page 438 ends

Item 12.
11111111111111111111111111111111000000000000000

Page 439 ends

Item 12.
00000000000000000000000000000000000000000000000

Page 440 ends

Item 12.
00000000000000000000000000000000000000000000000

Page 441 ends

Item 12.
000000000000000000000000000000000000000000

Page 442 ends

Item 12.

APN Address Unit Number Zone
779621003 83861 Calle Moreno Coachella CA 92236 Coachella 779301018 83525 Avenida San Domingo Coachella CA 92236 Coachella 779271007 50016 Calle Frontera Coachella CA 92236 Coachella 779270013 83512 Avenida Campanas Coachella CA 92236 Coachella 779271051 50295 Camino Magdalena Coachella CA 92236 Coachella 779300046 50238 Camino El Faro Coachella CA 92236 Coachella 779271024 50187 Camino Rosario Coachella CA 92236 Coachella 779271006 50022 Calle Frontera Coachella CA 92236 Coachella 779620032 83958 Calle Moreno Coachella CA 92236 Coachella 779620038 83934 Pyramid Ranch Dr Coachella CA 92236 Coachella 779270002 50049 Calle Frontera Coachella CA 92236 Coachella 779271001 50052 Calle Frontera Coachella CA 92236 Coachella 779271020 50112 Camino Convento Coachella CA 92236 Coachella 779270019 83548 Avenida Campanas Coachella CA 92236 Coachella 779270007 50019 Calle Frontera Coachella CA 92236 Coachella 779270017 83536 Avenida Campanas Coachella CA 92236 Coachella 779300032 50154 Camino Coras Coachella CA 92236 Coachella 779621007 83821 Calle Moreno Coachella CA 92236 Coachella 779300034 50166 Camino Coras Coachella CA 92236 Coachella 779270005 50031 Calle Frontera Coachella CA 92236 Coachella 779271031 50214 Camino Rosario Coachella CA 92236 Coachella 779620013 83762 Calle Moreno Coachella CA 92236 Coachella 779300036 50178 Camino Coras Coachella CA 92236 Coachella 779271039 50304 Camino Magdalena Coachella CA 92236 Coachella

Page 443 ends

Item 12.

Owner Owner Occupied Calls (12 mo)
Lucero Monica Soledad No 5
Solorio Lino Villanueva No 2
Morales Leticia Yes 2
Gurrola Miguel Hurtado No 2
Ortiz Shilynn T No 1
Konkala Venkata Siva Reddy No 0
Hilario Christopher No 0
Lopez Monica Yes 0
Flores Rudy V No 0
Villalobos Jorge A Hernandez No 0
Torres Rene No 0
Espinoza Alvaro Rosales No 0
Rubio Shamara Valdez No 0
Gonzalez Maria Guadalupe Yes 0
Trevino Marcy Christine Yes 0
Yacoubian Vahe Vasken No 0
Mares Jamison No 0
Navarro Melissa No 0
Rivera Jesus Rangel No 0
Rodriguez Amaris Angelica No 0
Alvarez Armando M & Irma Living Trust Dtd 03/25/08 No 0 Hernandez Liliana Beas No 0
Fausto Alejandro No 0
Saldivar Andres Yes 0

Page 444 ends

Item 12.

CAD Call # Date/Time Address Reporting District
Y--262140021 2026-08-03T03:43:20+00:00 83454 TODOS SANTOS AV, COACHELLA 80C4 Y--262130034 2026-08-02T05:54:14+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--262120044 2026-08-01T05:50:23+00:00 48580 CALLE TECOMARIA, COACHELLA 80B2 Y--262090036 2026-07-29T02:09:56+00:00 84420 CALLE RODRIGUEZ, COACHELLA 81A5 Y--262090034 2026-07-29T01:41:16+00:00 84434 CALLE CHAVEZ, COACHELLA 81A5 Y--262050057 2026-07-25T06:58:07+00:00 84136 SIENA LN, COACHELLA 82D2 Y--262050051 2026-07-25T05:17:17+00:00 50054 CALLE TOLOSA, COACHELLA 81A1 Y--262050041 2026-07-24T23:34:11+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--262050024 2026-07-24T20:48:58+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--262010013 2026-07-20T16:18:11+00:00 84126 CALENDULA AV, COACHELLA 80A6 Y--262010002 2026-07-20T08:11:23+00:00 84435 CALLE CHAVEZ, COACHELLA 81A5 Y--262000062 2026-07-20T05:18:54+00:00 84210 MIRAMAR CT, COACHELLA 81A7 Y--262000015 2026-07-19T14:45:02+00:00 48939 CAMINO CORTEZ, COACHELLA 80C4 Y--262000004 2026-07-19T08:17:00+00:00 84446 CALLE YSIANO, COACHELLA 81A5 Y--261980067 2026-07-18T04:56:34+00:00 84198 CAPITOLA AV, COACHELLA 81A7 Y--261980003 2026-07-17T08:18:35+00:00 83670 MECCA HILLS AV, COACHELLA 80B8 Y--261970040 2026-07-17T03:58:59+00:00 84434 CALLE CHAVEZ, COACHELLA 81A5 Y--261960030 2026-07-16T01:22:06+00:00 84464 CALLE LARRIVA, COACHELLA 81A5 Y--261930008 2026-07-12T10:11:14+00:00 84464 CALLE LARRIVA, COACHELLA 81A5 Y--261930006 2026-07-12T08:01:03+00:00 84447 CALLE RODRIGUEZ, COACHELLA 81A5 Y--261920032 2026-07-12T00:54:07+00:00 48068 LUNA DE NICOLETA ST, COACHELLA 80C5 Y--261910059 2026-07-11T06:45:29+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--261890038 2026-07-09T01:43:00+00:00 84120 AVENIDA EUROPA, COACHELLA 80B2 Y--261860020 2026-07-05T20:00:13+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--261850008 2026-07-04T11:52:10+00:00 48605 CAMINO LAS BRISAS, COACHELLA 80C4 Y--261840053 2026-07-04T05:06:43+00:00 83819 AVENIDA VERANO, COACHELLA 80B5 Y--261840021 2026-07-03T19:10:47+00:00 52142 ALLENDE DR, COACHELLA 82D7 Y--261830058 2026-07-03T05:55:57+00:00 52142 ALLENDE DR, COACHELLA 82D7 Y--261820008 2026-07-01T11:40:12+00:00 84464 CALLE LARRIVA, COACHELLA 81A5 Y--261820004 2026-07-01T10:13:21+00:00 84464 CALLE LARRIVA, COACHELLA 81A5 Y--261810070 2026-07-01T06:50:24+00:00 84442 CALLE RODRIGUEZ, COACHELLA 81A5 Y--261790027 2026-06-29T00:13:06+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--261790004 2026-06-28T09:17:17+00:00 50677 PASEO CISNEROS ST, COACHELLA 81D1 Y--261780035 2026-06-28T02:40:15+00:00 84095 AVENIDA CEDRUS, COACHELLA 80B2 Y--261780021 2026-06-27T20:55:28+00:00 83833 CORTE ECLIPSE, COACHELLA 80B5 Y--261780003 2026-06-27T08:33:43+00:00 48605 CAMINO LAS BRISAS, COACHELLA 80C4 Y--261770031 2026-06-26T18:09:07+00:00 84452 CALLE LARRIVA, COACHELLA 81A5 Y--261770003 2026-06-26T07:27:12+00:00 50223 PASEO BARCELONA, COACHELLA 81A4 Y--261760070 2026-06-26T06:04:45+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--261760069 2026-06-26T05:38:15+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--261740057 2026-06-24T03:13:27+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--261740021 2026-06-23T15:53:47+00:00 84451 CALLE LARRIVA, COACHELLA 81A5 Y--261710024 2026-06-21T00:27:18+00:00 48623 CHARLTON PEAK ST, COACHELLA 80B8 Y--261710015 2026-06-20T17:55:15+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--261700084 2026-06-20T06:53:48+00:00 83454 TODOS SANTOS AV, COACHELLA 80C4 Y--261690028 2026-06-19T00:07:00+00:00 53032 TORINO PL, COACHELLA 82D2

Page 445 ends

Item 12.

Y--261690016 2026-06-18T19:46:22+00:00 84120 AVENIDA EUROPA, COACHELLA 80B2 Y--261660051 2026-06-16T06:25:05+00:00 50271 PASEO CADIZ, COACHELLA 81A4 Y--261650040 2026-06-15T06:04:48+00:00 50271 PASEO CADIZ, COACHELLA 81A4 Y--261650039 2026-06-15T06:04:25+00:00 48805 CHARLTON PEAK ST, COACHELLA 80B8 Y--261650037 2026-06-15T05:17:06+00:00 83437 AGUA BLANCA AV, COACHELLA 80C4 Y--261640069 2026-06-14T04:06:43+00:00 50054 CALLE TOLOSA, COACHELLA 81A1 Y--261640055 2026-06-13T21:47:10+00:00 84120 AVENIDA EUROPA, COACHELLA 80B2 Y--261640003 2026-06-13T10:22:32+00:00 84442 CALLE YSIANO, COACHELLA 81A5 Y--261630043 2026-06-13T04:20:07+00:00 50584 CALLE CERVANTES, COACHELLA 81A5 Y--261620048 2026-06-12T05:15:38+00:00 49282 PLUMA VERDE PL, COACHELLA 80C1 Y--261610002 2026-06-10T07:07:21+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--261590028 2026-06-08T23:07:50+00:00 53005 MODENA TER, COACHELLA 82D2 Y--261580005 2026-06-07T07:50:07+00:00 53045 MODENA TER, COACHELLA 82D2 Y--261570064 2026-06-07T06:58:41+00:00 53019 TORINO PL, COACHELLA 82D2 Y--261570021 2026-06-06T16:08:42+00:00 83473 AGUA BLANCA AV, COACHELLA 80C4 Y--261560054 2026-06-06T06:37:38+00:00 84464 CALLE LARRIVA, COACHELLA 81A5 Y--261510038 2026-06-01T05:23:04+00:00 50564 CALLE CERVANTES, COACHELLA 81A5 Y--261470002 2026-05-27T09:09:41+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--261460039 2026-05-27T04:38:39+00:00 50145 CAMINO CORAS, COACHELLA 81A2 Y--261450080 2026-05-26T06:00:59+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--261440005 2026-05-24T08:14:59+00:00 83777 CORTE SOLIS, COACHELLA 80B5 Y--261430059 2026-05-24T06:40:33+00:00 83175 EL GRECO AV, COACHELLA 80C4 Y--261430002 2026-05-23T07:14:38+00:00 83531 AVENIDA SAN DOMINGO, COACHELLA 81A2 Y--261420042 2026-05-23T06:55:28+00:00 83531 AVENIDA SAN DOMINGO, COACHELLA 81A2 Y--261400002 2026-05-20T07:22:36+00:00 83157 TODOS SANTOS AV, COACHELLA 80C4 Y--261370003 2026-05-17T07:43:08+00:00 84447 CALLE RODRIGUEZ, COACHELLA 81A5 Y--261370002 2026-05-17T07:30:40+00:00 50564 CALLE CERVANTES, COACHELLA 81A5 Y--261360082 2026-05-16T23:00:37+00:00 50142 CAMINO CORAS, COACHELLA 81A2 Y--261360001 2026-05-16T07:22:41+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--261350028 2026-05-15T22:26:39+00:00 83357 PLUMA DORADA CT, COACHELLA 80C1 Y--261300018 2026-05-10T19:32:49+00:00 83628 MECCA HILLS AV, COACHELLA 80B8 Y--261300004 2026-05-10T08:03:25+00:00 84420 CALLE RODRIGUEZ, COACHELLA 81A5 Y--261300003 2026-05-10T07:54:18+00:00 84459 CALLE CHAVEZ, COACHELLA 81A5 Y--261300002 2026-05-10T07:21:54+00:00 50289 SAN CAPISTRANO DR, COACHELLA 81A1 Y--261290049 2026-05-10T06:51:20+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--261290028 2026-05-09T21:46:47+00:00 53045 MODENA TER, COACHELLA 82D2 Y--261230052 2026-05-04T04:20:03+00:00 84442 CALLE YSIANO, COACHELLA 81A5 Y--261230019 2026-05-03T14:04:21+00:00 84434 CALLE CHAVEZ, COACHELLA 81A5 Y--261230018 2026-05-03T13:53:40+00:00 86177 SONOMA CREEK RD, COACHELLA 84A8 Y--261220052 2026-05-03T06:31:35+00:00 83766 CORTE SOLIS, COACHELLA 80B5 Y--261220019 2026-05-02T16:48:25+00:00 84103 SIENA LN, COACHELLA 82D2 Y--261220006 2026-05-02T09:03:28+00:00 48580 CALLE TECOMARIA, COACHELLA 80B2 Y--261100045 2026-04-21T05:34:27+00:00 83763 AVENIDA VERANO, COACHELLA 80B5 Y--261090011 2026-04-19T09:01:07+00:00 50145 CAMINO CORAS, COACHELLA 81A2 Y--261070052 2026-04-18T06:09:16+00:00 83819 CORTE SOLIS, COACHELLA 80B5 Y--261070037 2026-04-18T02:11:13+00:00 53039 MODENA TER, COACHELLA 82D2 Y--261040009 2026-04-14T12:51:28+00:00 84044 BELLISSIMA AV, COACHELLA 82D2

Page 446 ends

Item 12.

Y--260990015 2026-04-09T14:35:50+00:00 50485 JALISCO AV, COACHELLA 81A6 Y--260960002 2026-04-06T07:21:35+00:00 84310 CATALINA AV, COACHELLA 81A7 Y--260960001 2026-04-06T07:16:23+00:00 50180 GOYA DR, COACHELLA 81A5 Y--260950025 2026-04-06T02:34:51+00:00 84422 CALLE LARRIVA, COACHELLA 81A5 Y--260950006 2026-04-05T07:52:58+00:00 48456 RED MOUNTAIN PL, COACHELLA 80B8 Y--260950001 2026-04-05T07:06:39+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--260940085 2026-04-05T05:48:59+00:00 49282 PLUMA VERDE PL, COACHELLA 80C1 Y--260940003 2026-04-04T08:40:10+00:00 84436 CALLE YSIANO, COACHELLA 81A5 Y--260930053 2026-04-04T05:37:34+00:00 84447 CALLE RODRIGUEZ, COACHELLA 81A5 Y--260930049 2026-04-04T03:53:19+00:00 84123 PALERMO CT, COACHELLA 82D2 Y--260900033 2026-04-01T03:20:06+00:00 83357 PLUMA DORADA CT, COACHELLA 80C1 Y--260890017 2026-03-30T17:21:29+00:00 84210 MIRAMAR CT, COACHELLA 81A7 Y--260890010 2026-03-30T15:15:43+00:00 84210 MIRAMAR CT, COACHELLA 81A7 Y--260870069 2026-03-29T06:45:03+00:00 48939 CAMINO CORTEZ, COACHELLA 80C4 Y--260870002 2026-03-28T07:52:08+00:00 44452 MASSON DR, COACHELLA 84A8 Y--260850010 2026-03-26T15:21:18+00:00 83585 MECCA HILLS AV, COACHELLA 80B8 Y--260840046 2026-03-26T04:59:08+00:00 84434 CALLE CHAVEZ, COACHELLA 81A5 Y--260840003 2026-03-25T08:26:50+00:00 50584 CALLE CERVANTES, COACHELLA 81A5 Y--260830067 2026-03-25T05:03:52+00:00 84435 CALLE RODRIGUEZ, COACHELLA 81A5 Y--260820053 2026-03-24T06:30:14+00:00 50502 CALLE CEBRINO ST, COACHELLA 81A5 Y--260820050 2026-03-24T04:47:50+00:00 50502 CALLE CEBRINO ST, COACHELLA 81A5 Y--260820022 2026-03-23T19:16:22+00:00 84431 CALLE LARRIVA, COACHELLA 81A5 Y--260820003 2026-03-23T07:53:59+00:00 50905 CALLE CARRASCO, COACHELLA 81A5 Y--260820002 2026-03-23T07:51:28+00:00 50502 CALLE CEBRINO ST, COACHELLA 81A5 Y--260810035 2026-03-23T04:06:05+00:00 84431 CALLE LARRIVA, COACHELLA 81A5 Y--260800058 2026-03-22T06:41:38+00:00 84446 CALLE YSIANO, COACHELLA 81A5 Y--260800045 2026-03-22T04:07:48+00:00 84431 CALLE LARRIVA, COACHELLA 81A5 Y--260790054 2026-03-21T05:30:01+00:00 84447 CALLE YSIANO, COACHELLA 81A5 Y--260790053 2026-03-21T05:21:34+00:00 84442 CALLE YSIANO, COACHELLA 81A5 Y--260740053 2026-03-16T06:05:14+00:00 53039 MODENA TER, COACHELLA 82D2 Y--260720053 2026-03-14T05:30:00+00:00 50567 CALLE CEBRINO, COACHELLA 81A5 Y--260670001 2026-03-08T08:02:17+00:00 84310 CATALINA AV, COACHELLA 81A7 Y--260660044 2026-03-08T06:53:25+00:00 84425 CALLE RODRIGUEZ, COACHELLA 81A5 Y--260660043 2026-03-08T06:41:22+00:00 50230 PASEO BARCELONA, COACHELLA 81A4 Y--260660041 2026-03-08T05:52:30+00:00 84425 CALLE RODRIGUEZ, COACHELLA 81A5 Y--260600040 2026-03-02T06:21:23+00:00 84026 CALLE GRANADA, COACHELLA 81A4 Y--260600013 2026-03-01T14:59:44+00:00 53019 TORINO PL, COACHELLA 82D2 Y--260600004 2026-03-01T08:44:30+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--260590045 2026-03-01T07:42:50+00:00 53032 TORINO PL, COACHELLA 82D2 Y--260590042 2026-03-01T06:47:59+00:00 48665 EL CASTILLO RD, COACHELLA 80C4 Y--260590031 2026-03-01T03:42:13+00:00 50855 CHIAPAS DR, COACHELLA 81A6 Y--260580054 2026-02-28T07:17:45+00:00 50845 CALLE CARRASCO, COACHELLA 81A5 Y--260580051 2026-02-28T06:26:30+00:00 84459 CALLE CHAVEZ, COACHELLA 81A5 Y--260580029 2026-02-28T00:06:38+00:00 48580 CALLE TECOMARIA, COACHELLA 80B2 Y--260500042 2026-02-20T00:38:33+00:00 50145 CAMINO CORAS, COACHELLA 81A2 Y--260470030 2026-02-17T01:16:48+00:00 52324 CATARINA CT, COACHELLA 82E6 Y--260450039 2026-02-15T05:31:54+00:00 50223 PASEO BARCELONA, COACHELLA 81A4

Page 447 ends

Item 12.

Y--260440047 2026-02-14T07:09:36+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--260420003 2026-02-11T14:09:17+00:00 50145 CAMINO CORAS, COACHELLA 81A2 Y--260380057 2026-02-08T06:41:39+00:00 50253 PASEO BARCELONA, COACHELLA 81A4 Y--260380052 2026-02-08T06:22:16+00:00 50656 CALLE CERVANTES, COACHELLA 81A5 Y--260360019 2026-02-05T20:42:47+00:00 52043 PRIMITIVO DR, COACHELLA 82D7 Y--260340015 2026-02-03T17:07:06+00:00 50745 TABASCO CT, COACHELLA 81A6 Y--260330011 2026-02-02T20:43:45+00:00 50845 CALLE CARRASCO, COACHELLA 81A5 Y--260310046 2026-02-01T07:02:30+00:00 84421 CALLE CHAVEZ, COACHELLA 81A5 Y--260310044 2026-02-01T06:33:11+00:00 84421 CALLE CHAVEZ, COACHELLA 81A5 Y--260310011 2026-01-31T14:46:37+00:00 50707 CALLE CEBRINO, COACHELLA 81A5 Y--260300053 2026-01-31T05:18:37+00:00 53910 CALLE BALDERAS, COACHELLA 82B6 Y--260210006 2026-01-21T11:03:56+00:00 84067 SIENA LN, COACHELLA 82D2 Y--260180041 2026-01-19T02:07:42+00:00 84210 MIRAMAR CT, COACHELLA 81A7 Y--260180010 2026-01-18T09:54:46+00:00 50289 SAN CAPISTRANO DR, COACHELLA 81A1 Y--260180006 2026-01-18T09:20:58+00:00 50508 CALLE CERVANTES, COACHELLA 81A5 Y--260180005 2026-01-18T09:08:09+00:00 83503 SAN MATEO AV, COACHELLA 80B8 Y--260170049 2026-01-18T07:58:38+00:00 84436 CALLE YSIANO, COACHELLA 81A5 Y--260170046 2026-01-18T07:00:00+00:00 50508 CALLE CERVANTES, COACHELLA 81A5 Y--260170038 2026-01-18T05:32:18+00:00 50271 PASEO CADIZ, COACHELLA 81A4 Y--260170037 2026-01-18T05:27:47+00:00 50508 CALLE CERVANTES, COACHELLA 81A5 Y--260170036 2026-01-18T04:49:29+00:00 50508 CALLE CERVANTES, COACHELLA 81A5 Y--260150004 2026-01-15T08:34:32+00:00 84067 SIENA LN, COACHELLA 82D2 Y--260120001 2026-01-12T08:32:55+00:00 50740 TABASCO CT, COACHELLA 81A6 Y--260100048 2026-01-11T04:37:28+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--260100038 2026-01-11T02:36:54+00:00 83560 LAPIS DR, COACHELLA 80B6 Y--260100001 2026-01-10T08:30:20+00:00 84438 CALLE RODRIGUEZ, COACHELLA 81A5 Y--260080018 2026-01-08T20:17:59+00:00 83391 CAMINO BONITO AV, COACHELLA 80C5 Y--260030043 2026-01-04T07:02:40+00:00 83391 SAN ASIS DR, COACHELLA 81A1 Y--260010033 2026-01-01T12:24:51+00:00 53032 TORINO PL, COACHELLA 82D2 Y--260010030 2026-01-01T11:57:29+00:00 84129 MONZA LN, COACHELLA 82D2 Y--260010027 2026-01-01T11:06:16+00:00 53016 TORINO PL, COACHELLA 82D2 Y--260010020 2026-01-01T09:38:42+00:00 84431 CALLE LARRIVA, COACHELLA 81A5 Y--260010019 2026-01-01T09:11:11+00:00 84431 CALLE LARRIVA, COACHELLA 81A5 Y--260010008 2026-01-01T08:21:21+00:00 84431 CALLE LARRIVA, COACHELLA 81A5 Y--253610009 2025-12-27T10:55:40+00:00 83411 SAN ASIS DR, COACHELLA 81A1 Y--253610008 2025-12-27T10:55:00+00:00 83437 SAN ASIS DR, COACHELLA 81A1 Y--253590047 2025-12-26T06:43:39+00:00 85214 CORTE DEL ROBLE, COACHELLA 82B7 Y--253590013 2025-12-25T10:06:09+00:00 84421 CALLE CHAVEZ, COACHELLA 81A5 Y--253560002 2025-12-22T08:21:32+00:00 50740 TABASCO CT, COACHELLA 81A6 Y--253560001 2025-12-22T08:20:38+00:00 50740 TABASCO CT, COACHELLA 81A6 Y--253550045 2025-12-22T06:33:45+00:00 83157 TODOS SANTOS AV, COACHELLA 80C4 Y--253550014 2025-12-21T11:58:25+00:00 84434 CALLE CHAVEZ, COACHELLA 81A5 Y--253550012 2025-12-21T11:43:47+00:00 84434 CALLE CHAVEZ, COACHELLA 81A5 Y--253540027 2025-12-21T00:36:02+00:00 84184 FIESTA RD, COACHELLA 80A6 Y--253540002 2025-12-20T08:25:02+00:00 50262 CALLE TOLOSA, COACHELLA 81A1 Y--253530041 2025-12-20T02:33:13+00:00 84464 CALLE LARRIVA, COACHELLA 81A5 Y--253520044 2025-12-19T07:35:20+00:00 50584 CALLE CERVANTES, COACHELLA 81A5

Page 448 ends

Item 12.

Y--253520042 2025-12-19T06:40:58+00:00 84464 CALLE LARRIVA, COACHELLA 81A5 Y--253520041 2025-12-19T06:04:10+00:00 48665 EL CASTILLO RD, COACHELLA 80C4 Y--253470040 2025-12-14T03:00:20+00:00 49069 SUMMER ST, COACHELLA 80A6 Y--253470001 2025-12-13T08:54:10+00:00 50264 SAN CAPISTRANO DR, COACHELLA 81A1 Y--253460052 2025-12-13T06:36:47+00:00 50289 SAN CAPISTRANO DR, COACHELLA 81A1 Y--253430038 2025-12-10T01:56:23+00:00 84026 CALLE GRANADA, COACHELLA 81A4 Y--253430003 2025-12-09T09:59:12+00:00 50740 TABASCO CT, COACHELLA 81A6 Y--253400007 2025-12-06T10:46:17+00:00 83175 EL GRECO AV, COACHELLA 80C4 Y--253390003 2025-12-05T09:41:15+00:00 83628 MECCA HILLS AV, COACHELLA 80B8 Y--253320001 2025-11-28T08:20:05+00:00 84420 CALLE RODRIGUEZ, COACHELLA 81A5 Y--253310061 2025-11-28T07:16:11+00:00 50567 CALLE CEBRINO, COACHELLA 81A5 Y--253310059 2025-11-28T07:12:27+00:00 50658 CALLE CEBRINO, COACHELLA 81A5 Y--253310058 2025-11-28T07:07:51+00:00 50707 CALLE CEBRINO, COACHELLA 81A5 Y--253300001 2025-11-26T08:01:06+00:00 83777 CORTE ESTIVO, COACHELLA 80B5 Y--253290018 2025-11-25T22:21:53+00:00 84026 CALLE GRANADA, COACHELLA 81A4 Y--253290004 2025-11-25T12:03:38+00:00 50133 CAMINO CONVENTO, COACHELLA 81A2 Y--253270014 2025-11-23T11:12:06+00:00 49896 CALLE QUINTERRA, COACHELLA 80A7 Y--253270003 2025-11-23T08:27:29+00:00 84420 CALLE RODRIGUEZ, COACHELLA 81A5 Y--253260039 2025-11-23T06:44:45+00:00 50229 PASEO BARCELONA, COACHELLA 81A4 Y--253240037 2025-11-21T00:16:38+00:00 84026 CALLE GRANADA, COACHELLA 81A4 Y--253220006 2025-11-18T09:09:25+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--253210056 2025-11-18T07:18:57+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--253210055 2025-11-18T05:53:45+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--253210002 2025-11-17T09:51:28+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--253200037 2025-11-17T07:37:11+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--253200036 2025-11-17T07:24:02+00:00 48805 CHARLTON PEAK ST, COACHELLA 80B8 Y--253180028 2025-11-14T23:57:09+00:00 84026 CALLE GRANADA, COACHELLA 81A4 Y--253130030 2025-11-10T00:00:28+00:00 84459 CALLE CHAVEZ, COACHELLA 81A5 Y--253120035 2025-11-09T07:04:30+00:00 83645 LAPIS DR, COACHELLA 80B6 Y--253120031 2025-11-09T04:31:08+00:00 50159 SAN CAPISTRANO DR, COACHELLA 81A1 Y--253110049 2025-11-08T05:20:55+00:00 83637 GRANITE PASS TRL, COACHELLA 80B8 Y--253060001 2025-11-02T07:03:00+00:00 48605 CAMINO LAS BRISAS, COACHELLA 80C4 Y--253040034 2025-11-01T00:46:22+00:00 83589 SHADOWROCK DR, COACHELLA 80B6 Y--252940057 2025-10-22T05:22:49+00:00 83777 CORTE ECLIPSE, COACHELLA 80B5 Y--252850005 2025-10-12T11:02:22+00:00 83777 CORTE SOLIS, COACHELLA 80B5 Y--252840043 2025-10-12T06:03:24+00:00 48068 LUNA DE NICOLETA ST, COACHELLA 80C5 Y--252840007 2025-10-11T09:47:55+00:00 84481 CALLE CHAVEZ, COACHELLA 81A5 Y--252830041 2025-10-11T05:00:50+00:00 84131 PALERMO CT, COACHELLA 82D2 Y--252800009 2025-10-07T17:54:53+00:00 48824 CAMINO CORTEZ, COACHELLA 80C4 Y--252780025 2025-10-05T22:00:01+00:00 53055 MODENA TER, COACHELLA 82D2 Y--252780021 2025-10-05T20:14:47+00:00 48824 CAMINO CORTEZ, COACHELLA 80C4 Y--252750047 2025-10-03T05:49:11+00:00 50567 CALLE CEBRINO, COACHELLA 81A5 Y--252750045 2025-10-03T05:35:53+00:00 50658 CALLE CEBRINO, COACHELLA 81A5 Y--252750016 2025-10-02T18:03:29+00:00 84459 CALLE CHAVEZ, COACHELLA 81A5 Y--252700047 2025-09-28T06:01:52+00:00 84103 SIENA LN, COACHELLA 82D2 Y--252690047 2025-09-27T06:42:46+00:00 84103 SIENA LN, COACHELLA 82D2 Y--252690003 2025-09-26T07:59:01+00:00 84442 CALLE RODRIGUEZ, COACHELLA 81A5

Page 449 ends

Item 12.

Y--252690001 2025-09-26T07:35:11+00:00 84442 CALLE RODRIGUEZ, COACHELLA 81A5 Y--252670030 2025-09-24T23:37:31+00:00 84434 CALLE LARRIVA, COACHELLA 81A5 Y--252650010 2025-09-22T17:33:01+00:00 53006 MODENA TER, COACHELLA 82D2 TS-252650016 2025-09-22T17:33:01+00:00 53006 MODENA TER, COACHELLA 82D2 Y--252630041 2025-09-21T05:49:32+00:00 50656 CALLE CERVANTES, COACHELLA 81A5 Y--252630038 2025-09-21T05:19:36+00:00 50656 CALLE CERVANTES, COACHELLA 81A5 Y--252620043 2025-09-20T01:24:02+00:00 84421 CALLE CHAVEZ, COACHELLA 81A5 Y--252510017 2025-09-08T19:06:18+00:00 52324 CATARINA CT, COACHELLA 82E6 Y--252480031 2025-09-05T22:07:42+00:00 52324 CATARINA CT, COACHELLA 82E6 Y--252480023 2025-09-05T20:12:24+00:00 52324 CATARINA CT, COACHELLA 82E6 Y--252440041 2025-09-02T06:50:18+00:00 48999 PLAYA DEL AMOR ST, COACHELLA 80C4 Y--252420046 2025-08-31T06:28:15+00:00 84453 CALLE RODRIGUEZ, COACHELLA 81A5 Y--252420039 2025-08-31T04:57:33+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--252410049 2025-08-30T06:17:00+00:00 84459 CALLE CHAVEZ, COACHELLA 81A5 Y--252410045 2025-08-30T06:00:51+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--252410016 2025-08-29T18:17:28+00:00 52324 CATARINA CT, COACHELLA 82E6 Y--252380039 2025-08-27T06:48:17+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--252370027 2025-08-26T02:49:47+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--252350038 2025-08-24T05:27:17+00:00 84431 CALLE LARRIVA, COACHELLA 81A5 Y--252350004 2025-08-23T08:16:03+00:00 50298 CAMINO MAGDALENA, COACHELLA 81A2 Y--252320038 2025-08-20T21:39:30+00:00 50133 CAMINO CONVENTO, COACHELLA 81A2 Y--252280025 2025-08-17T01:57:51+00:00 84431 CALLE LARRIVA, COACHELLA 81A5 Y--252280001 2025-08-16T07:20:56+00:00 53032 TORINO PL, COACHELLA 82D2 Y--252270046 2025-08-16T06:03:53+00:00 53032 TORINO PL, COACHELLA 82D2 Y--252270027 2025-08-15T23:09:49+00:00 48999 PLAYA DEL AMOR ST, COACHELLA 80C4 Y--252270002 2025-08-15T08:42:24+00:00 83405 SAN ASIS DR, COACHELLA 81A1 Y--252260020 2025-08-14T19:13:52+00:00 84052 CALLE GRANADA, COACHELLA 81A4 Y--252220040 2025-08-11T06:39:49+00:00 84459 CALLE CHAVEZ, COACHELLA 81A5 Y--252200050 2025-08-09T06:33:24+00:00 48974 CHICHEN ITZA RD, COACHELLA 80C4 Y--252170022 2025-08-05T22:25:08+00:00 83777 CORTE ESTIVO, COACHELLA 80B5

Page 450 ends

Item 12.

CAD Call Type Sub-Type Reason Reason category STR status APN DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612510027 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 DOMESTIC BATTERY Domestic Battery Domestic / family violence & restraining orders Licensed 603532022 911 CALL MOBILE/CELL PHONE 911 Call Administrative / assist / follow-up Licensed 768500023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768502008 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521027 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 779262017 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 ABANDONED VEHICLE Abandoned Vehicle Traffic / parking Licensed 603454025 UNKNOWN TROUBLE Unknown Trouble Other disturbance (verbal, subject, unknown trouble) Licensed 768503003 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768482022 PARKING VIOLATION Parking ViolationTraffic / parking Licensed 612520022 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768483033 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612581021 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768502008 ASSIST OTHER DEPARTMENT Assist Other Department Administrative / assist / follow-up Licensed 768510007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501002 DISTURBANCE FAMILY Disturbance - Domestic / family Domestic / family violence & restraining orders Licensed 612431009 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 SUSPICIOUS VEHICLE Suspicious Vehicle Suspicious activity / alarms / area checks Licensed 603525002 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 SHOOTING AT OCCUPIED DWELLING/VEHICLE Shooting At Occupied Dwelling/Vehicle Other / miscellaneous Licensed 612503020 FIREWORKS Fireworks Loud music / party / noiseLicensed 612600003 DRIVING WHILE INTOXICATED Driving While Intoxicated Other / miscellaneous Licensed 768280003 SUSPICIOUS PERSON Suspicious Person Suspicious activity / alarms / area checks Licensed 768280003 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500027 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 PUBLIC ASSIST Public Assist Administrative / assist / follow-up Licensed 779620009 MEDICAL AID - UNDER 18 Medical Aid - Under 18 Welfare / medical / mental health Licensed 603525009 DISTURBANCE Disturbance - Other Other disturbance (verbal, subject, unknown trouble) Licensed 612602020 DISCHARGING FIREARM IN GROSSLY NEGLIGENT MANNER Discharging Firearm In Grossly Negligent Manner Violent / weapons Licensed 612503020 CALIFORNIA VEHICLE CODE VIOLATIONCalifornia Vehicle Code Violation Traffic / parking Licensed 768510009 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768022003 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 SEXUAL ASSAULT/BATTERY Sexual Assault/Battery Other / miscellaneous Licensed 768510004 PUBLIC ASSIST Public Assist Administrative / assist / follow-up Licensed 612574014 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612510027 CHECK THE WELFARE Check The Welfare Welfare / medical / mental health Licensed 768521023

Page 451 ends

Item 12.

FOLLOW UP Follow Up Administrative / assist / follow-up Licensed 603525002 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768021003 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768021003 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612583006 CONTRIBUTING TO DELINQUENCY OF MINOR Contributing To Delinquency Of Minor Other disturbance (verbal, subject, unknown trouble) Licensed 612510006 DOMESTIC BATTERY Domestic Battery Domestic / family violence & restraining orders Licensed 779262017 BURGLARY IN PROGRESS Burglary Property crime (burglary, theft, vandalism, fraud) Licensed 603525002 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501010 DISTURBANCE Disturbance - Other Other disturbance (verbal, subject, unknown trouble) Licensed 768511013 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612590032 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768520031 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768460016 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768520045 DISTURBANCE Disturbance - Other Other disturbance (verbal, subject, unknown trouble) Licensed 612510015 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510007 DISTURBANCE, DISTURBANCE - NOISE NOISE Disturbance, Disturbance - Noise Other / miscellaneous Licensed 768511014 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 PARKING VIOLATION Parking ViolationTraffic / parking Licensed 779300028 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612611017 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612541007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 779301017 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 779301017 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612532012 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501002 OPEN DOOR Open Door Other / miscellaneous Licensed 768511014 ASSIST OTHER DEPARTMENT Assist Other Department Administrative / assist / follow-up Licensed 779300030 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 CIVIL VIOLATION/PROBLEM Civil Violation/Problem Other disturbance (verbal, subject, unknown trouble) Licensed 612590042 DISTURBANCE DOMESTIC VIOLENCE Disturbance - Domestic / family Domestic / family violence & restraining orders Licensed 612581018 MALICIOUS MISCHIEF/VANDALISM PAST Malicious Mischief/Vandalism Property crime (burglary, theft, vandalism, fraud) Licensed 768500023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510011 CHECK THE WELFARE Check The Welfare Welfare / medical / mental health Licensed 779291002 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 CHECK THE WELFARE Check The Welfare Welfare / medical / mental health Licensed 768460016 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501010 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768502008 OPEN DOOR Open Door Other / miscellaneous Licensed 697320062 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612611044 CHECK THE WELFARE Check The Welfare Welfare / medical / mental health Licensed 768460024 SUSPICIOUS CIRCUMSTANCE Suspicious Circumstance Suspicious activity / alarms / area checks Licensed 603532022 CHECK THE WELFARE Check The Welfare Welfare / medical / mental health Licensed 612600007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 779300028 KEEP THE PEACE Keep The PeaceOther disturbance (verbal, subject, unknown trouble) Licensed 612611020 PARKING VIOLATION Parking ViolationTraffic / parking Licensed 768520022 ILLEGAL ENTRY Illegal Entry Other / miscellaneous Licensed 768460013

Page 452 ends

Item 12.

TRAFFIC COLLISION NO INJURY - NO ROAD BLOCKAGE Traffic CollisionTraffic / parking Licensed 768101004 UNKNOWN TROUBLE Unknown Trouble Other disturbance (verbal, subject, unknown trouble) Licensed 768490019 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768030012 UNKNOWN TROUBLE Unknown Trouble Other disturbance (verbal, subject, unknown trouble) Licensed 768503006 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612571020 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 612590032 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501009 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501002 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521006 AREA CHECK Area Check Suspicious activity / alarms / area checks Licensed 612590042 FOLLOW UP Follow Up Administrative / assist / follow-up Licensed 768482022 DISTURBANCE Disturbance - Other Other disturbance (verbal, subject, unknown trouble) Licensed 768482022 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520022 UNKNOWN TROUBLE Unknown Trouble Other disturbance (verbal, subject, unknown trouble) Licensed 697320068 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 612584002 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768502008 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768511013 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501004 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510027 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510027 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500004 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500009 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510027 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500004 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500004 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768502001 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501010 BURGLARY IN PROGRESS Burglary Property crime (burglary, theft, vandalism, fraud) Licensed 768520022 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768511002 DOMESTIC BATTERY Domestic Battery Domestic / family violence & restraining orders Licensed 768490019 FOLLOW UP Follow Up Administrative / assist / follow-up Licensed 768501006 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768021015 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501006 DISTURBANCE DOMESTIC VIOLENCE Disturbance - Domestic / family Domestic / family violence & restraining orders Licensed 768010011 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 768520045 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521023 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 612544013 MAN DOWN Man Down Other / miscellaneous Licensed 768111015 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510011 CIVIL VIOLATION/PROBLEM Civil Violation/Problem Other disturbance (verbal, subject, unknown trouble) Licensed 603532022 DISTURBANCE FAMILY Disturbance - Domestic / family Domestic / family violence & restraining orders Licensed 779300028 BURGLARY PAST Burglary Property crime (burglary, theft, vandalism, fraud) Licensed 778472018 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768022003

Page 453 ends

Item 12.

DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 MALICIOUS MISCHIEF/VANDALISM PAST Malicious Mischief/Vandalism Property crime (burglary, theft, vandalism, fraud) Licensed 779300028 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768020034 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768511011 COUNTY/CITY ORDINANCE VIOLATIONCounty/City Ordinance Violation Other / miscellaneous Licensed 768272003 FOUND PROPERTY Found PropertyAdministrative / assist / follow-up Licensed 768111022 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 768500011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768503005 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768503005 UNKNOWN TROUBLE Unknown Trouble Other disturbance (verbal, subject, unknown trouble) Licensed 768511006 SUSPICIOUS PERSON Suspicious Person Suspicious activity / alarms / area checks Licensed 778400006 SUSPICIOUS VEHICLE Suspicious Vehicle Suspicious activity / alarms / area checks Licensed 768460027 INCORRIGIBLE JUVENILE Incorrigible Juvenile Other / miscellaneous Licensed 768482022 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 779291002 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510030 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612583012 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501009 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510030 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768021003 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510030 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510030 SUSPICIOUS PERSON Suspicious Person Suspicious activity / alarms / area checks Licensed 768460027 ASSIST OTHER DEPARTMENT Assist Other Department Administrative / assist / follow-up Licensed 768111023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612460028 UNKNOWN TROUBLE Unknown Trouble Other disturbance (verbal, subject, unknown trouble) Licensed 768500026 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 612441014 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 779293011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521017 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521019 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500004 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500004 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500004 DISCHARGING FIREARM IN GROSSLY NEGLIGENT MANNER Discharging Firearm In Grossly Negligent Manner Violent / weapons Licensed 779293014 SUSPICIOUS CIRCUMSTANCE Suspicious Circumstance Suspicious activity / alarms / area checks Licensed 779293018 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 778410008 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768503005 MEDICAL AID - UNDER 18 Medical Aid - Under 18 Welfare / medical / mental health Licensed 768111023 MEDICAL AID - UNDER 18 Medical Aid - Under 18 Welfare / medical / mental health Licensed 768111023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612532012 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768502008 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768502008 CHECK THE WELFARE Check The Welfare Welfare / medical / mental health Licensed 603443017 ANNOYING/OBSCENE TELEPHONE CALLSnnoying/Obscene Telephone Calls Other disturbance (verbal, subject, unknown trouble) Licensed 779291012 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768511013

Page 454 ends

Item 12.

DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612544013 SUSPICIOUS PERSON Suspicious Person Suspicious activity / alarms / area checks Licensed 603441018 AREA CHECK Area Check Suspicious activity / alarms / area checks Licensed 779290012 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 779291002 FOLLOW UP Follow Up Administrative / assist / follow-up Licensed 768010011 MEDICAL AID - UNDER 18 Medical Aid - Under 18 Welfare / medical / mental health Licensed 768111023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612541007 ASSIST OTHER DEPARTMENT Assist Other Department Administrative / assist / follow-up Licensed 612581018 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768511002 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510020 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768511006 DISCHARGING FIREARM IN GROSSLY NEGLIGENT MANNER Discharging Firearm In Grossly Negligent Manner Violent / weapons Licensed 612602045 CRIMES AGAINST CHILDREN-SEXUAL PAST Crimes Against Children-Sexual Other / miscellaneous Licensed 768010011 SUSPICIOUS CIRCUMSTANCE Suspicious Circumstance Suspicious activity / alarms / area checks Licensed 779271015 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 603570001 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768022002 ASSIST OTHER DEPARTMENT Assist Other Department Administrative / assist / follow-up Licensed 768010011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 ASSIST OTHER DEPARTMENT Assist Other Department Administrative / assist / follow-up Licensed 612583006 CHECK THE WELFARE Check The Welfare Welfare / medical / mental health Licensed 768010011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612461025 TERRORIST THREATS Terrorist ThreatsOther / miscellaneous Licensed 779262006 SUSPICIOUS VEHICLE Suspicious Vehicle Suspicious activity / alarms / area checks Licensed 612571031 UNKNOWN TROUBLE Unknown Trouble Other disturbance (verbal, subject, unknown trouble) Licensed 612503020 ASSIST OTHER DEPARTMENT Assist Other Department Administrative / assist / follow-up Licensed 612453020 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612602016 PARKING VIOLATION Parking ViolationTraffic / parking Licensed 612611017 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612431009 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510014 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521007 FOLLOW UP Follow Up Administrative / assist / follow-up Licensed 612521003 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 768460014 MISSING PERSON Missing PersonWelfare / medical / mental health Licensed 612521003 DISTURBANCE Disturbance - Other Other disturbance (verbal, subject, unknown trouble) Licensed 768511002 UNKNOWN TROUBLE Unknown Trouble Other disturbance (verbal, subject, unknown trouble) Licensed 768510020 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768460024 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768460024 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500027

Page 455 ends

Item 12.

DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500027 PATROL INFORMATION Patrol Information Other / miscellaneous Licensed 768503008 PETTY THEFT PAST Petty Theft Property crime (burglary, theft, vandalism, fraud) Licensed 768520032 PETTY THEFT PAST Petty Theft Property crime (burglary, theft, vandalism, fraud) Licensed 768520032 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768511011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768511011 SUSPICIOUS CIRCUMSTANCE Suspicious Circumstance Suspicious activity / alarms / area checks Licensed 768503005 CIVIL VIOLATION/PROBLEM Civil Violation/Problem Other disturbance (verbal, subject, unknown trouble) Licensed 778472018 DISTURBANCE FAMILY Disturbance - Domestic / family Domestic / family violence & restraining orders Licensed 778472018 DISTURBANCE FAMILY Disturbance - Domestic / family Domestic / family violence & restraining orders Licensed 778472018 VIOLATION OF RESTRAINING ORDER DOMESTIC VIOLENCE Violation Of Restraining Order Domestic / family violence & restraining orders Licensed 612530020 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768501001 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 CIVIL VIOLATION/PROBLEM Civil Violation/Problem Other disturbance (verbal, subject, unknown trouble) Licensed 778472018 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500004 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 779271040 ANNOYING/OBSCENE TELEPHONE CALLSnnoying/Obscene Telephone Calls Other disturbance (verbal, subject, unknown trouble) Licensed 779271015 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768500004 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521023 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768521023 CHECK THE WELFARE Check The Welfare Welfare / medical / mental health Licensed 612530020 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 779293013 AUDIBLE BURGLARY ALARM Audible Burglary Alarm Suspicious activity / alarms / area checks Licensed 768010015 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 768510011 DISTURBANCE NOISE Disturbance - Loud music / noise Loud music / party / noiseLicensed 612520031 FOLLOW UP Follow Up Administrative / assist / follow-up Licensed 612602045

Page 456 ends
← All documents from this meeting