Sutter Pointe Specific Plan – Sutter County, CA | Served as an adjunct to Sutter County’s Planning Services staff, facilitating the project’s entitlement review process among various departments. The project encompassed approximately 7,500 acres along the southern edge of the County within the commute shed of downtown Sacramento and provided for a mix of land uses including several residential villages, employment centers, and a town center. Initially, Mr. Jones’ role was to provide peer review services for the various entitlements, ensuring that the documentation prepared by the project applicant, such as the specific plan, development standards, and design guidelines, were complete and adequate and would effectively guide future buildout.

However, as the entitlement process ensued, his role evolved to writing significant sections of the project’s development regulations. This effort included writing several sections of the project’s Zoning Code, as well as providing significant input on the makeup and framework for design guidelines and development regulations.

Regional University Specific Plan – Placer County, CA | Vance’srole was to assist the project manager with the county’s entitlement review effort for a master-planned community in western Placer County. The 1,100-acre project consisted of a university on 600 acres and an adjoining 500-acre, mixed-use, planned urban development. Under the direction of the county’s planning staff, Mr. Jones worked collaboratively with the project applicant to create the development standards for the design of a University Town Center, located adjacent to the university. In this role, he helped direct the location and orientation of land uses that would result in a high-density/intensity urban core that would be supported by the university. This included a retail town center along the university’s eastern edge and a central promenade on which the Town Center and adjoining residential neighborhoods would be organized. Further, he developed the development standards and design guidelines to ensure that the University Town Center would develop as envisioned.

Roseville 2020 General Plan Update – Roseville, CA| Vance….

City of Foster City General Plan Update – Foster City, CA|Vance….

West Roseville Specific Plan –Roseville, CA| Vance….

OTHER PROJECT EXPERIENCE
Subdivision Maps
• Bickford Ranch Large and Small Lot Tentative Maps, Placer County, CA • Placer Ranch Large Lot Tentative Map, Placer County, CA • Creekview Specific Plan, Small Lot Tentative Maps, Roseville, CA • Sierra Vista Specific Plan, Solaire Large and Small Lot Tentative Maps, Roseville, CA • West Roseville Specific Plan Parcel F-55 Small Lot Tentative Map, Roseville, CA • Westpark Business Center Tentative Parcel Map, Roseville, CA • Village 7 Specific Plan Small Lot Tentative Map, Lincoln, CA • Sierra View Country Club Small Lot Tentative Map, Roseville, CA Specific Plans, Master Plans, General Plans
• Placer Commerce Center Master Plan, Placer County, California • Placer Ranch Specific Plan, Placer County, California • Sierra Vista Specific Plan, Roseville, California
• Regional University Specific Plan, Placer County, California • Village 7 Specific Plan, Lincoln, California
Item 8C135
Vance Jones (continued)

Page 6 ends

• South Lathrop Specific Plan, Lathrop, California
• Southeast Elk Grove Specific Plan, Elk Grove, California • Berenda Ranch Specific Plan, Madera County, California • Fresno Campus Community Plan, Fresno, California
• Sutter Pointe Specific Plan, Sutter, California
• Moore Ranch Specific Plan, Lincoln, California
• Dixon Downs Specific Plan Revisions, Dixon, California • West Roseville Specific Plan, Roseville, California
• Stone Point Master Plan, Roseville, California
• Burchell Hill Specific Plan, Oakdale, California
• Highway 33 Specific Plan, Newman, California
• Twelve Bridges Master Plan, including Master Land Use Plan, Specific Plans, and General Development Plans, Lincoln, California
• Pelandale-Snyder Specific Plan, Modesto, California
• Del Rio Hills Planned Unit Development, Rio Vista, California • Aitken Ranch II General Development Plan, Lincoln, California • City of Sacramento General Plan Update, Sacramento, California • Sutter County General Plan Update, Sutter County, California • City of Roseville General Plan Update, Roseville, California • City of Foster City General Plan Update, Foster City, California • Community Profile, Foster City, California
• Roseville On-Call Planning Services, Roseville, California Redevelopment
• Marlin Cove Redevelopment Project Environmental Impact Report, Foster City, California • Port O’Call Redevelopment Project Environmental Impact Report (Miramar Apartments), Foster City, California • Foster-Woodstock Redevelopment Project General Plan Amendment (Parkside Towers), Foster City, California Urban Design Plans
• McHenry Avenue Urban Design Plan, Escalon, California • Clovis Avenue Railroad Corridor Area Plan, Clovis, California • Villa Del Lago Architectural Design Guidelines, Stanislaus County, California • Twelve Bridges Community Design Framework Manual, Lincoln, California • Foster City Residential Architectural and Solar Guidelines, Foster City, California Transportation
• Lathrop Bicycle Transportation Plan, Lathrop, California Item 8C136
Vance Jones (continued)

Page 7 ends

• Twelve Bridges Multimodal Transportation Plan, Lincoln, California Item 8C137
Tim Chamberlain
Tim Chamberlain is a Principal Environmental Planner specializing in the delivery of small- and large-scale infrastructure projects. He has 20 years of experience leading environmental technical studies, preparing environmental documents, and managing teams of environmental specialists from project concept through construction. Timbrings extensive experience in a wide variety of planning projects, including land use, environmental permitting and regulatory compliance, cultural resources, and community outreach and engagement. He has worked on public works projects, specializing in those with federal funding, for most of his career and is experienced in the CEQA and NEPA analysis, technical document preparation, and project approvals processes. As a former Caltrans employee, Timreceived extensive training and experience in Intermodal Transportation Management System and GIS based programs.

RELEVANT PROJECT EXPERIENCE
US-50/Western Placerville Interchanges – Placerville, CA | Lead Environmental Planner. The US-50/Western Placerville Interchanges Project included improvements to the existing interchange at US-50 and Placerville drive as well as a new freeway connection at the existing Ray Lawyer Drive overcrossing. Tim worked on this project from 2009 through 2020 including Phases 1A, 1B, 2, and 2.2 which included phased construction of improvements on Fair Lane, Mother Lode Drive, and the Ray Lawyer Interchange. Tim’s role as lead environmental planner included multiple updates to the environmental record including a supplemental EIR in 2014 and iterative NEPA revalidations. The phased construction also required updated technical reports to accommodate design changes. Tim also led the effort to obtain multiple sets of environmental permits for the various phases including a 404 permit from the Army Corps of Engineers, a 401 Water Quality Certification from the Regional Water Quality Control Board, and a 1602 Streambed Alteration Agreement from the California Department of Fish and Wildlife.
5th Street Bridge Replacement – Yuba City, CA | Lead Environmental Planner. Tim managed the complete environmental process including preparation of environmental technical studies, CEQA and NEPA documents, obtaining all necessary environmental permits, coordination of Endangered Species Act Consultation, Native American Consultation, flood agency coordination, and providing full service environmental construction support. Constructions support activities included full time Native American Monitoring in sensitive area of the project, preconstruction surveys, regulator coordination with regulatory agencies to ensure permit measures were implemented, elderberry shrub transplanting, mitigation bank purchases, on-site habitat restoration, fish protection/relocation in the Feather River and hydroacoustic monitoring for protected fish migrating up the Feather River.

Bodega Avenue Corridor Reconstruction – Sebastopol, CA | Providing preliminary environmental studies for the reconstruction of a major east-west route that services much regional traffic in addition to local city vehicles. The project involves perform engineering design and project sequence planning for Bodega Avenue between High Street to the east and Pleasant Hill Road to the west Infrastructure improvements along Bodega Avenue including roadway stabilization, repaving, adding sidewalks to eliminate gaps, and bicycle lane striping. A key component of sidewalks work will be making determination whether or not sufficient right-ofway is present for the sidewalk work to occur. Repaving includes assessments of the existing pavement condition and the methods required to reconstruct to modern standards. Wood Rodgers is providing project management/administration, mapping, utility coordination, engineering studies, preliminary design, final design, and environmental NEPA documentation.

PROJECT ROLE
Environmental Lead

CLASSIFICATION
Principal Environmental Planner

EDUCATION
BA, Political Science, University of
California, Los Angeles, 2005

PROFESSIONAL AFFILIATIONS
American Public Works Association

YEARS OF EXPERIENCE
• 20 years total
• 4 years with Wood Rodgers
Item 8C138
Tim Chamberlain (continued)

Page 2 ends

City of Sacramento, Sacramento River Parkway Trail – Sacramento CA| Environmental lead for this project to complete preliminary engineering, public outreach, environmental clearance, final design, and right-of-way services for the Sacramento River Parkway Project. The project proposes an approximately 4-mile-long multi-use trail along the east levee of the Sacramento River, from Garcia Bend Park to Zacharias Park. This federally funded project also includes preparing documentation to obtain necessary approvals to comply with the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA).

Grant Avenue/State Route (SR) 128/Russell Blvd Bike and Pedestrian Improvements –Winters, CA| Providing environmental supportfor the construction of this project located in unincorporated Yolo County. This project is listed in the Metropolitan Transportation and Improvement Plan (MTIP) for the Sacramento Area Council of Governments and project isfunded with Regional Active Transportation Program and Regional Surface Transportation Program grant funds and local Traffic Impact Fees. As such, a key component of the project involves bicycle and pedestrian improvements as well as greenhouse gas reduction characteristics.

Additionally, this project schedule is driven by funding constraints with construction in 2026. The project includes bicycle and pedestrian improvements from the intersection of Matsumoto Lane and Grant Avenue/SR 128 in Winters to Russell Blvd/County Road (CR) 32 and Shams Way in unincorporated Yolo County. Scope of services include project management for the planning, project approval, environmental compliance, right of way acquisition, utility relocation, and development of complete project plans, specifications, and estimates for the public bidding and construction of the project.

Monier Circle Stormwater Detention Basin – City of Rancho Cordova, CA | Lead Environmental Planner providing full service CEQA and NEPA documentation for this federally funded flood risk reduction project. The project would provide additional flood capacity to alleviate flooding at downstream roadway crossings of the Folsom South Canal. Mr. Chamberlain is overseeing a team of environmental specialists to provide a cultural and biological study, CEQA document, and coordination with Cal OES and FEMA for NEPA documentation associated with flood protection funding. This project has completed CEQA and is proceeding with regulatory permits at the Regional Water Quality Control Board and the California Department of Fish and Wildlife. Construction is expected in 2025.

Knights Landing Small Community Flood Risk Reduction Project – Yolo County, CA | Lead Environmental Planner supporting Yolo County (County) for its Small Communities Flood Risk Reduction Program (SCFRRP) Phase 2 Grant. Services included preparation of environmental technical studies including a biological resources report, wetland delineation, cultural resources report, and hazardous waste site assessment and soil testing. Tim lead the effort to prepare a CEQA Initial Study leading to a Mitigated Negative Declaration. The project was able to avoid all impacts to the adjacent wetland habitat avoiding the need for regulatory permits.

City of Chico Storm Water Master Plan – Butte County, CA | Lead Environmental Plannerfor the completion and update of the Storm Water Master Plan in coordination and compliance with MS4 permit requirements for the City of Chico. Tim is leading the effort to prepare a Program Level Environmental Impact Report that will support the Storm Water Master Plan and a variety of smaller improvement projects needed to implement that plan. Scope includes assisting the City with revising the SDMP to create a SWMP and will model the current system for hydraulics and hydrology to assist with stormwater planning. The plan will also update the City’s digital storm water maps and provide recommendations for improvement to the current system to stay within current local, state, and federal guidelines.

RD 817 Bear River North Levee Setback Project – Yuba County, CA | Lead Environmental Planner providing full services environmental for the Gibbs Pond and 40 Mile Road culvert replacements through the Bear River Levee. These services included preparation of environmental technical studies, preparation of a CEQA Initial Study leading to a Mitigated Negative Declaration, and obtaining environmental permits.

Marysville and Yuba City Boat Ramp Dredging – Marysville/Yuba City, CA | Lead Environmental Planner and Project Manager.

This project involved dredging soil from areas around the Yuba City and Marysville Boat Ramps. Sediment from upstream flows had built up around these boat launching facilities preventing their use for predominantly recreational use of the Feather River. Tim led an environmental team to provide full environmental services to Sutter County and the City of Marysville including preparation of environmental technical studies, CEQA documentation, and environmental permits for the proposed action. Permitting included coordination with CDFW, Army Corps of Engineers, and Section 7 Consultation with the National Marine Fisheries Service to provide protection for federally listed anadromous fish species that spawn up the Feather River. Tim also managed the environmental construction support process for these projects which included use of fish screening and turbidity curtains to minimize impacts to protected fish.

Item 8C139
Dennis Barber, PLS
Dennis Barber is the Principal Surveyor and manager of Wood Rodgers’ Sacramento Survey Department. He brings 25 years of surveying experience in Central and Northern California, from which he has developed effective collaboration and strong relationships with state and local agencies. Dennis is known for providing reliable and consistent production and processing of the surveying and mapping aspects of land development and public works projects. He has experience with all aspects of surveying and mapping including GPS Control Setup; boundaries, plats, and descriptions; exhibits; Record Maps; right-of-way mapping; photogrammetric and planimetric mapping; as well as cadastral, topographic, and bathymetric surveys. Survey elements include waterways, all surface features associated with land development, roadways and highways, levees, floodplain mapping, and others.

RELEVANT PROJECT EXPERIENCE
Sacramento County On-Call Surveying and Mapping – Sacramento, CA| Principal Surveyor supporting county-wide on-call surveying and mapping services, from mapping intakes to full control, construction staking, and topographic surveys. Responsible for the intake, review, and processing of all County records-of-survey, along with plats and legal description and corner records. Collaborates closely with the Sacramento County field survey section and provides surveys in support of the County’s workload.

Tasks include boundary surveys requiring the setting of monuments along property lines memorialized with a record-of-survey. Under this on-call contract, Wood Rodgers has provided the following additional services:

GPS Surveys, UAS flight services, LiDAR (aerial, mobile, and terrestrial), topographic mapping, boundary/legal support, plat mapping, map review, construction surveys, and final staking on an as needed basis.

City of Oakland, Surveying Services for Safe Routes to Schools 2021 – 2023 –Oakland, CA |Dennis provided QA/QC for this project for land surveying services at 12 intersections in the City of Oakland for the Department of Transportation to support plans to implement Safe Routes to School improvements at the 12 locations. The project proposed various countermeasures as well as upgrades in pedestrian facilities. All surface features within the project limits were collected (but not limited to): curb, gutter,sidewalk, edge of pavement, driveways, handicap ramps, parking, walls, fences, vaults, pull boxes, pedestals, utility poles, overhead lines, surface indications of subsurface utilities. Appropriate survey methods were used to obtain elevations of sewer and drainage improvements. The field survey is being used to develop engineering base drawings and digital terrain models (DTM) to be used in the detailed civil design as well as for the production of complete biddable PS&E package for the proposed design.

City of Oakland, Citywide Surveying for Paving Projects –Oakland, CA | Dennis provided QA/QC for preparation of Corner Records for the City's paving projects. This effort is for 150 monuments on various streets within the City of Oakland. Specific scope of services included mobilization of a survey crew to locate monuments, set reference monuments, then prepare Corner Records and submit to the County of Alameda for processing.

PROJECT ROLE
Survey & Mapping Manager

CLASSIFICATION
Principal Surveyor I

EDUCATION
BS, Surveying, Pennsylvania State
University, 1999

REGISTRATIONS/CERTIFICATIONS
Professional Land Surveyor, CA #8067

ADDITIONAL TRAINING
Subdivision Map Act, Michael Durkee,
2002
Boundary Control and Legal Principles,
Walter Robillard, 2003
Land Survey Exam Review Course,
Paul Cuomo, 2004 & 2005
Modern Boundary Principles, Paul
Cuomo, 2005
The Preparation and Processing of
Condominium Plans, Michael J.

Pallamary, 2006

YEARS OF EXPERIENCE
• 25 years total
• 23 years with Wood Rodgers
Item 8C140
Dennis Barber, PLS (continued)

Page 2 ends

Town of Paradise, On-System Rehabilitation & System Safety - Paradise, CA | Survey Manager for field surveying and base mapping support for this project that includes Geotechnical/Pavement Design Report, Pavement Design Memorandum, utility coordination, preliminary roadway, signal, intersection and HSIP improvement design’ plans,specifications and estimates (PS&E), Caltrans coordination; public outreach and engagement; bidding assistance; and construction support, and systemic intersection safety improvements for the Zone 3 area in Paradise California.

On-Call Surveying City College Water T-Main Replacement – Sacramento, CA| Principal Surveyor and Project Manager supporting as-needed surveying services. Under this contract, Dennis supervised generation of a topographical base map to support the water transmission main replacement project for nearly four miles of roadway along Freeport Boulevard and 21st Street. Services included complete topographic surveying and base mapping, record data research, and right-of-way mapping. Mobile LiDAR data was collected and processed to establish a foundation for the topographic survey. Detailed conventional surveys were performed to supplement the more vital areas of the project, including underground utilities and protected features such as trees and historic landmarks. To support monument preservation, completed research and location of existing monuments to support the pre- and post-construction Corner Records. Surveying and mapping were provided for ultimate design and construction of a water transmission main replacement. All base mapping supported plans, specifications, and estimates with the City’s Procedures Manual, and Standard Specifications and Plans.

On-Call Surveying Fruitridge Manor & Lawrence Park – Sacramento, CA| Project Surveyor supporting on-call survey tasks. Under this contract, Dennis supervised the base mapping, record data research, and right-of-way mapping to support the ultimate design to include, utilities improvements, curb and gutter, sidewalk, and crosswalks. The base mapping supported plans, specifications, and estimates with current procedures, Standard Specifications, and Plans.

Sutter Butte Flood Control Agency, Feather River West Levee Project – Sutter and Butte Counties, CA| Project Surveyor in support of the project right-of-way team for 40 miles of levee improvements at the west levee of the Feather River between the Sutter Bypass and ThermalitoAfterbay. Efforts include base map and boundary resolution, management of preparation and processing of appraisal exhibits, plats and legals for land acquisition and easements, topographic, bathymetric, and construction quality control surveys, monumentation and Record-of-Surveys to memorialize the project acquisitions and overall survey/mapping support of the project right-of-way team.

East 5th Street Sewer and Water Main Replacement – Lincoln, CA| Supported the survey team for a project to prepare plans, specifications, and estimates to rehabilitate or replace the water and sewer mains on East 5th Street, construct drainage improvements including new curb and gutter, reconstruct the roadway include signage and striping, and remove a Valley Oak Tree situated within the roadway. Provided surveying and topographic mapping for the project area. The design level topographic survey captured existing improvements pertinent for the analysis of the water and sewer mains. Features collected included USA markings, major surface features from sidewalk to sidewalk, and overhead and subsurface facility locations. Developed a base map that included the design level topographic survey together with the existing right-of-way lines, existing easements, and lot lines.

Roseville Benchmarks – Roseville, CA| Project Surveyor to support the City’s benchmark network extending into West Roseville.

Managed the day-to-day operations of providing field surveying to establish several new City benchmarks in West Roseville.

Sacramento County, Elverta Road/SR-99 Interchange – Sacramento, CA| Project Surveyor responsible for the day-to-day coordination of any survey or mapping effort needed to support a project to construct a new partial-cloverleaf interchange to replace an existing signalized intersection on a four-lane expressway section of State Route 99/70.

US Army Corps of Engineers, Sacramento Weir Widening –West Sacramento, CA| For this ongoing United State Army Corps of Engineers (USACE) project, Dennis is Project Surveyor providing survey support for the widening of the existing weir between the Sacramento River and the Sacramento/Yolo Bypass, located in Yolo County, California. The project includes the realignment of the existing Old River Road, supporting fish passage through the Sacramento Bypass. Survey efforts include a large-scale control network, underground utility surveys, aerial topographic surveys, detailed ground surveys, boundary surveys, bathymetric surveying, and integrated digital terrain model in and surrounding the Sacramento Bypass. Coordination with various agencies including City of West Sacramento, Yolo County, Sacramento Flood Control Agency, State of California Department of Water Resources and the USACE was required to determine project requirements and specifications and acceptance.

Department of Water Resources, Floodplain Mapping – Sacramento, CA| Project Surveyor supporting the design team with bathymetric and hydraulic surveys, Mission Planning and Post Processing of Control for LiDAR acquisition and photo imagery for Item 8C141
Dennis Barber, PLS (continued)

Page 3 ends

approximately 2,000 square miles for floodplain mapping of the Lower Sacramento River System. The hydraulic surveys included over 2,000 cross-section surveys, over 250 hydraulic structures, and stream gage surveys as needed by the design team. All survey data was collected to the standard set by and the approval of DWR, FEMA, and the USACE. Dennis worked side-by side with the project staff, subcontractors and DWR; participated in all pertinent meetings and conference calls; and attended all Survey Work Group Meetings to discuss and determine scope and procedures for current and future task orders.

Sutter Butte Flood Control Agency, Feather River West Levee Project – Sutter and Butte Counties, CA| Project Surveyor in support of the project right-of-way team for 40 miles of levee improvements at the west levee of the Feather River between the Sutter Bypass and ThermalitoAfterbay. Efforts include base map and boundary resolution, managing preparation and processing of appraisal exhibits, plats, and legals for over 250 land acquisitions and easements, topographic, bathymetric, and construction quality control surveys, and overallsurvey/mapping support of the project right-of-way team.

US Army Corps of Engineers, Sacramento RiverbankProtection Program Erosion Site Surveys – Sacramento, Sutter, and Yolo Counties, CA| Project Surveyor providing survey support to the USACE for the design of erosion repairs as well as protection and control measures. Managed the day-to-day operations of a complex workflow that included topographic, bathymetric, and tree surveys, together with the development with DTM surfaces for large areas along the river channel. The contract included 43 project sites totaling approximately 25 miles of bank surveys along with approximately 62 miles of bathymetric surveys. Notable erosion sites include three along the Pocket/Little Pocket east levees, and two in the area of Pioneer Reservoir and the Sacramento Deep Water Ship Canal lock. Coordinated with the USACE, DWR, Caltrans, and a variety of Levee and Reclamation Districts.

Lookout Slough Restoration Project – Solano County, CA| For an ongoing Ecosystem Investment Partners (EIP) project, Dennis is the Project Surveyor providing survey support for the restoration of 3,600 acres of tidal marsh north of the Cache Slough Complex in the Sacramento-San Joaquin Rivers Delta, located in Solano County, California. The survey efforts included an overall project control network, topographic, bathymetric, and boundary survey. Coordination with various agencies including Solano, County, Yolo County, and the State Lands Commission was required to determine water rights and their impacts on the property. A project Record-of-Survey is being processed through Solano County to document the findings.

City of Sacramento, Dixieanne Avenue “Green Street” – Sacramento, CA| Project Surveyor in support of a project to retrofit an existing six-block residential/commercial corridor to a more pedestrian “friendly” passageway.

Moss Landing Segment of Monterey Bay Sanctuary Scenic Trail –Monterey County, CA| Project Surveyor and responsible for the day-to-day coordination and any survey or mapping effort needed to support the project. This segment is approximately 4,200 feet long and crosses Elkhorn Slough on a new 380-ft-long bridge, passes through sensitive natural environment and cultural resources, and passes through the Moss Landing Power Plant. This project will be constructed in the State right of way and requires close coordination with Caltrans.

Oakland Waterfront Trail –US Audio/Capture Technologies Segment –Oakland, CA| Project Surveyor for providing surveys as part of the design services for a gap closure segment of the Oakland Waterfront Trail. Part of the San Francisco Bay Trail, the Oakland Waterfront Trail is a planned 400-mile network of bicycle and hiking trails that will form a continuous ring around the Bay.

International Drive Extension – Rancho Cordova, CA| Project Surveyor and responsible for the day-to-day coordination and any survey or mapping effort needed to support a project that extends a new 6-lane arterial roadway as part of a road and bridge project that connects Kilgore Road to Sunrise Boulevard.

John Laing Homes, Meridian at Lincoln Crossing – Lincoln, CA| Responsible forlayout, preparation, and processing of one Subdivision Map containing 257 lots.

DR Horton, Sierra View at Lincoln Crossing – Lincoln, CA| Responsible forlayout, preparation, and processing of a subdivision map for a condominium project.Dennis was also responsible for the preparation and processing of nine sets of condo plans containing 174 units.

Elliott Homes, Stoneridge East – Roseville, CA| Responsible for the preparation and processing of two subdivision maps containing 300 lots.

Hirschdale Road Bridge Replacement Project –Nevada County, CA| Project Surveyor for an approximate 1/3 mile stretch of rural 2-lane roadway in Nevada County concurrent with the replacement of the road’s two bridges, performing surveys within the Truckee River and the Union Pacific Railroad.

Item 8C142
Dennis Barber, PLS (continued)

Page 4 ends

Lennar Communities, Westborough – Sacramento, CA| Responsible forlayout, preparation, and processing of 13 subdivision maps containing 900 lots.

Lennar Communities, North Natomas Estates – Sacramento, CA| Responsible forlayout, preparation, and processing of two subdivision maps containing 110 lots.

Lennar Communities, Northpointe Park Phase 2 – Sacramento, CA| Responsible forlayout, preparation, and processing of a Master Parcel Map covering 463-acres and 18 Subdivision Maps containing 1500 Lots.

Lennar Communities, Northborough Phase II – Sacramento, CA| Responsible for preparation and processing of a master parcel map covering 250-acres, including 12 Subdivision Maps containing 800 lots.

Lennar Communities, The Meadows, Lennar Communities – Sacramento, CA| Responsible forlayout, preparation, and processing of two subdivision maps containing 99 lots.

JTS Communities, Meadowview Estates – Sacramento, CA| Responsible forlayout, preparation, and processing of two subdivision maps containing 250 lots.

DR Horton, Natomas Creek – Sacramento, CA| Responsible forlayout, preparation, and processing of three subdivision maps containing 490 lots.

Lennar Communities, Regency Park – Sacramento, CA| Responsible for layout, preparation, and processing of four subdivision maps containing 350 lots.

Lennar Communities, Heritage at Natomas Park – Sacramento, CA| Responsible forlayout, preparation, and processing of a master parcel map covering 291-acres, including 21 subdivision maps containing 1,250 lots.

Alleghany Properties, Parkview – Sacramento, CA| Responsible forlayout, preparation, and processing of two master parcel maps covering 242-acres, including 10 subdivision maps containing 680 lots.

KB Homes, The Hamptons – Sacramento, CA| Responsible forlayout, preparation, and processing of eight subdivision maps containing 1,268 lots.

Kern Schumacher, Schumacher Property – Sacramento, CA| Responsible forlayout, preparation, and processing of multiple master parcel maps covering 400-acres.

Elliot Homes, Villages of Zinfandel – Rancho Cordova, CA| Responsible forlayout, preparation, and processing of a large lot map covering 190-acres, including 16 Subdivision Maps containing 1,400 lots.

DR Horton, North Laguna Pointe – Sacramento, CA| Responsible forlayout, preparation, and processing of a subdivision map for a condominium project, including seven sets of Condo Plans containing 153 units.

RD 817 Bear River North Levee Setback Project – Yuba County, CA| Survey Manager for land and bathymetric surveying portion of this project. The existing levee has experienced some erosion since the 2008 California Department of Water Resources Central Valley Floodplain Evaluation and Delineation (CVFED) Project developed topographic mapping for the area. In addition, the setback levee alignment requires supplemental planimetric surveying data for use in a setback levee design. As a result, new topographic mapping will be prepared for the project for the length of the setback levee alignment and 250 feet upstream and downstream of the project’s limits. The survey will extend laterally from the northern waterline of the Bear River to a point 200 feet landward of the setback levee landside toe. Bathymetric cross sections will be prepared at 200-foot intervals throughout the Project length. A total of ten bathymetric cross sections will be prepared.

Item 8C143
Mischelle “Mickey” Smith, PE, GE
Mickey has 27 years of professional experience in geotechnical engineering, materials engineering, and construction quality control. She has been responsible for the overview of all field exploration and laboratory testing and design services executed during performance of geotechnical investigation reports and Engineer of Record project management. Mickey is responsible for the formulation of foundation design recommendations for structures, structural pavement sections (AASHTO), public and private improvements, and mass grading operations. She is also responsible for the design and evaluation of flood retention structures and embankments. She is experienced in performing slope stability analyses, rockfall simulation utilizing CRSP, and design of catchment areas. Mickey has also led a team of engineers in developing local policies regarding slope evaluation and design limitations associated with hillside developments and retaining structures.

RELEVANT PROJECT EXPERIENCE

ROADWAY
South Virginia Street Widening, RTC of Washoe County | Reno Nevada The project consists of rehabilitation and/or reconstructing South Virginia Street from Longley Lane to NB I-580 Off Ramp. Wood Rodgers provided geotechnical exploration testing and reporting services to identify and report existing structural pavement sections (including subbase, CTB, base course, and plantmix bituminous pavement section). Mickey provided project oversight and technical review of exploration protocols and report development for the geotechnical characterization of site conditions. Site conditions were relied upon to qualify subgrade conditions and to help develop pavement rehabilitation/reconstruction approaches.

Holcomb Avenue Improvements, RTC of Washoe County | Reno, Nevada This project consists of the rehabilitation of approximately 0.55 miles of Holcomb Avenue from Burns Street to Liberty Avenue in Reno, Nevada. The project will include demolition, grading, pavement reconstruction, sidewalk, driveway, curb and gutter replacement as necessary, correction of localized drainage deficiencies, ADA/PROWAG assessment and compliance, construction of pedestrian ramps, reconstruction of driveways, preparation of easement documentation, traffic signal modifications and other incidentals necessary for the roadway within the Project limits. Wood Rodgers is responsible to perform engineering design, topographic survey and quality assurance and construction management services. Mickey provided project oversight and technical review of exploration protocols and report development for the geotechnical characterization of site conditions. Site conditions were relied upon to qualify subgrade conditions and to help develop pavement rehabilitation/ reconstruction approaches.

Ski Way Traffic Safety Improvements, IVGID | Incline Village, Nevada Mickey provided geotechnical support for this project that included preparing a unique plan to improve safety and circulation for Ski Way, a busy local Lake Tahoe roadway in the winter. Ski Way acts as both a local road connecting the Tyrolian Village neighborhood with Incline Village and parking for visitors to Diamond Peak Ski Resort. IVGID contacted Wood Rodgers and asked for help in developing a solution in conjunction with programmed pavement reconstruction. After extensive analysis of existing conditions and behaviors, Wood Rodgers engineered a plan that

PROJECT ROLE
Geotechnical Engineering

CLASSIFICATION
Principal

EDUCATION
BS, Civil Engineering, University of Reno,
Nevada, 1980
BS, Geological Engineering, University of
Nevada, Reno, 1981

REGISTRATIONS/CERTIFICATIONS
Professional Civil Engineer, CA #38777
Professional Civil Engineer, NV #6972
Professional Geological Engineer, CA
#2892

PROFESSIONAL AFFILIATIONS
Member, Association of Engineering
Geologists, Sierra Nevada Chapter
Member, Builders Association of Northern
Nevada
Member, City of Reno Development
Advisory Group

YEARS OF EXPERIENCE
• 27 years total
• 14 years with Wood Rodgers
Item 8C144
Mischelle “Mickey” Smith, PE, GE (continued)

Page 2 ends

incorporates a family of roundabouts (including unique mini roundabouts) to improve circulation while slowing down through-traffic to mitigate conflicts with loading/unloading skiers. These roundabouts were combined with revised parking layouts that help offset the loss of roadside parking from the roundabout footprints and potential safety enhancements such as roadside pedestrian buffers.

SE McCarran Boulevard Widening and Rehabilitation, RTC | Reno, Sparks, Nevada This project involves the widening of McCarran Boulevard from Longley Lane to Greg Street. This roadway is part of the National Highway System as well as the State Highway System. These designations dictate additional coordination with NDOT, City of Reno, City of Sparks, Truckee Meadows Flood Management Project as well as other entities. This project includes construction of sound walls, drainage improvements including large box culvert, pedestrian bridges as well as a complete geometric design for a six lane facility to fit in as much as possible in the existing right-of-way. Mickey was the laboratory manager on this project and the lead geotechnical engineering.

USA Parkway, NDOT (Sub to Jacobs) | Storey/Lyon Counties Nevada Approximately 12 miles of highway will be designed and constructed as part of this project. One of the most unique components of the project is that this section of roadway extends across virgin terrain. This characteristic creates a very different approach demand.

Material analyses for cut/fills, aggregate sources, slope stability analyses, etc., are essentially approached with limited physical constraints other than a concern for costs. Mickey was the lead geotechnical engineer for the project overseeing: exploration, materials testing, preliminary identification of borrow sources, slope analyses for both cuts and embankments, and formulation of grading recommendations. Supplementary investigations specific to structures will also be provided as the design progresses.

Terminal Way Rehabilitation, RTC | Reno, Nevada
Mickey was responsible for the formulation and characterization of geotechnical design constraints associated with the 1 + mile of pavement rehabilitation proposed for the Terminal Way, Gentry Way, Neil Road Corridor. A unique approach Mischelle has adopted when considering rehabilitation design is to evaluate the design R-Value based not only on the standard protocols but also based on the existing subgrade moisture contents. Due to the R-Value strength sensitivity to moisture content, this provides a more reasonable assessment base that considers long term subgrade conditions not just end of construction.

Raggio Parkway Improvements, DRI Research Parks, Ltd. | Reno, Nevada Mickey provided geotechnical support for the rehabilitation of the mile-long roadway in support of development of the surrounding 328 acre Dandini Research Park, Desert Research Institute and Truckee Meadows Community College campuses. The project is a complex mixture of pavement rehabilitation, intersection and roundabout improvements, and pedestrian and ADA compliance work.

As the roadway serves three community assets in the Research Park, DRI and TMCC campuses, the project relies upon involvement from those institutions as well as other community stakeholder groups including the City of Reno, Regional Transportation Commission, Nevada Department of Transportation and the Nevada State Public Works Board. Additional work on Raggio Parkway included construction management, construction coordination with contractor, construction meetings, as-built drawings, observation of asphalt concrete removal and overexcavation for new structural section, concrete placement for pedestrian ramps, curb/gutter and sidewalk, placement of new pavement, density testing, and concrete testing. Inspection, testing, and documentation were performed in accordance with the Standard Specifications for Public Works Construction (Orange Book).

Diamond Road Improvement Project, Duckwater Shoshone Tribe and Reck Brothers Construction, LLC | Nevada Ms. Smith is the geotechnical manager for this project that consists of the design and construction of approximately 0.7 mile of roadway on the Duckwater Shoshone Reservation in Nye County, Nevada. Responsibilities included overseeing exploration and testing services, culminating in the preparation of a geotechnical report which presented site preparation and grading requirements as well as design parameter for the structural pavement section. Estimated Construction Cost: $8.5 million.

WATER RESOURCES
City of Portola General Plan Safety Element Update & Local Hazard Mitigation Plan, City of Portola | California (2009) Ms. Smith is providing geologic and seismic analysis on this project for the development of the City of Portola’s Local Hazard Mitigation Plan (following the 2008 FEMA Guidance Documents) and updating the General Plan Safety Element. Funding for the project is provided through the CDBG and 2008 DRI grant program. Unique aspects of the project include project web site with interactive community survey, risk assessment using the HAZUS-MH analysis tool, consideration of volcanic activity impacts, and evaluation of Grizzly Valley Dam break risk and impact. The work is progressing in close coordination with the City and involved agencies and citizens groups.

Item 8C145
Mischelle “Mickey” Smith, PE, GE (continued)

Page 3 ends

Hellwinkle Channel, Town of Gardnerville | Nevada
Project Manager on this traffic analysis, design, and NDOT permitting to accommodate a change in control of access, ramp terminal improvements and tying in future Warrior Lane. Wood Rodgers has prepared a detailed operations analysis of the proposed roundabout ramp terminal for eastbound traffic using SIDRA software. The operations of this intersection have also been modeled with the proposed Warrior Lane roundabout and a Major Deviation from NDOT Access Management Standards prepared to support the proposed layout. Wood Rodgers will be conducting a complete interchange operations analysis including current and future performance of westbound ramp intersections, effects on adjacent interchanges, and developing mitigation strategies to support the planned growth.

Griff Creek, County of Placer | King’s Beach, California Ms. Smith led geotechnical evaluations in support of water quality improvements planned for the Griff Park of the King’s Beach community. Included were geotechnical test pits, soil sampling, evaluation of seasonal high groundwater based on mottling and gleying of in-situ soils, assessment of height of capillary rise, and percolation testing. Design components include ditch improvements, stream restoration and infiltration and detention basins.

NDOT US50 Glenbrook Slope Stabilization, NDOT | Nevada
Ms. Smith led geotechnical evaluations in support of slope stabilization for the Glenbrook area of US50. Included were geotechnical borings, REMI seismic refraction analysis, evaluation of rockfall, and design recommendations which have been accepted by the project TAC. The project is currently final design of US50 Project A has been completed with construction anticipated 2011. Design of US50 Project B is ongoing. Design components include rockfall netting, retaining walls, & Vegetated Reinforced Soil Slopes (VRSS).

SR431 evaluations have included gabion stabilized slopes and evaluations of retaining walls.

Lake Forest Erosion Control Project, Placer County Public Works | Placer County, California Ms. Smith led geotechnical evaluations in support of water quality improvements planned for the Lake Forest community and improvement area. Included were geotechnical test pits, soil sampling, evaluation of seasonal high groundwater based on mottling and gleying of in-situ soils, and percolation testing. Design components include permeable pavement, curb and gutter, and stream restoration.

Gonowabie Slope Assessment, Washoe County | South Lake Tahoe, California As Project Manager, Mrs. Smith has recently completed performing the geotechnical investigation and analyses associated with a localized slope failure. Located in the Tahoe Basin, this project requires careful consideration of long-term impact slope mitigation measures will have on adjacent improvements. Limited construction area, constrained both by access and desire/need to limit impact, presents special concerns and sensitivity to project approach. Design components will include retaining structures complimented by revegetation considerations.

US 50, Pioneer Trail to SR 207 | Washoe and Douglas Counties, Nevada Reviewed Project Study Report for preliminary geotechnical constraints as related to the integrated development of a regionalsystem of transportation in the Tahoe Region through the completion of a loop road between California and Nevada.

AVIATION
Project 2413 Taxiways A, F &F Improvements, Clark County Department of Aviation | North Las Vegas Airport, Las Vegas, Nevada Mrs. Smith provided geotechnical services on this project that consisted of subsurface soils investigations, laboratory testing, pavement design and preparation of complete plans, specifications and engineers estimate. The project consisted of miscellaneous FAA required airfield improvements including drainage improvements for much of the airfield, restriping of several taxiways and runways as well as pavement reconfiguration of 2 taxiways within the airfield to improve airfield safety. Additionally, several signage and lighting upgrades were designed to update the airfield to current FAA standards. During construction, our staff will provide Engineer of Record Services to monitor construction activities for conformance with the plans and specifications including review of material submittals, construction pavement requests, change orders and preparation of record drawings.

Runway 16L-34R Touchdown Area Rehabilitation, Reno-Tahoe Airport Authority | Reno-Tahoe International Airport, Reno, Nevada
Mrs. Smith provided geotechnical services on this project that consisted of civil design of the rehabilitation of runway pavement at the touchdown and turning areas of the runway. Project design included a full evaluation of the entire length of the runway, mapping surface distresses along the length of the runway, pavement design, electrical design, geotechnical engineering as well as project Item 8C146
Mischelle “Mickey” Smith, PE, GE (continued)

Page 4 ends

phasing. This work consisted of pulverization of existing portland cement concrete pavement, subgrade preparation, asphalt-treated permeable base, PCC pavement, removal replacement of centerline lights and marking. During construction, will provide Engineer of Record Services to monitor construction activities for conformance with the plans and specifications including review of material submittals, construction payment requests, change orders and preparation of record drawings.

Reno Tahoe International Airport Stage 14, Reno Tahoe Airport Authority | Reno, Nevada The project entailed reconstructing the existing Portland Cement Concrete (PCC) and Asphalt Treated Permeable Base (ATPB) apron along the southern side of Concourse B. Mischelle was responsible for formulating the geotechnical design parameters based on existing data and conducting verification testing during construction through plate bearing test analyses on both the existing and newly constructed ATPB surfaces and subgrade. Subgrade stabilization recommendations were also an important component of the geotechnical considerations due to the presence of fine grained soils and close proximity to groundwater.

Reno Tahoe International Airport Stage 15, Reno Tahoe Airport Authority | Reno, Nevada Stage 15 consists of reconstructing the existing PCC/ATPB apron section along the northern side of Concourse B and improving an equipment storage area just north of the terminal. Mischelle was responsible for performing the geotechnical investigations and design level report for the planned improvements in accordance with AC 150/5320-6E. Subgrade stabilization recommendations were also an important component of the geotechnical considerations due to the presence of fine grained soils and close proximity to groundwater.

STRUCTURES
RTIA Snow Removal Equipment Building, Reno Tahoe Airport Authority | Reno, Nevada Wood Rodgers provided complete civil design and geotechnical engineering for the Snow Removal Equipment building. Vehicle loads for airport snow plows and equipment are huge. The specialized equipment required additional considerations for structural pavement sections and slab-on-grade support. Mischelle prepared the design level geotechnical report presenting recommendations regarding: site preparation and grading, foundation support requirements, and roadbed and slab on grade preparation.

VA Hospital Seismic upgrade | Reno, Nevada
Mrs. Smith was the project manager on this projects that consisted of restoring the original Veterans Administration Hospital – Reno Campus hospital from an administrative hub back to a medical facility. The original structure needed to undergo a seismic evaluation and retrofit design to meet current standards. Wood Rodgers’ services included: surveying, geotechnical engineering, materials testing and verification of structural members.

Renown Kiley Campus | Sparks, Nevada
The current plan for the Renown Kiley Campus is the construction of a main structure with supplemental access and parking via a secondary structure. Phased construction will lend itself to incorporating terraced facilities with retaining walls and varying grades.

The Campus is in relatively close proximity to the Spanish Springs Fault Zone. Use of Refraction Microtremor Surveys helped identify and characterize the potential for liquefaction prior to drilling. This allows WR the flexibility to be focused in their exploration protocols especially for critical structures such as a hospital or medical facility. The REMI surveys also allow IBC site classification to be refined without the need to advance 100 feet deep borings. Mischelle was the geotechnical engineer for the project and responsible for the formulation of design parameters including: earth pressures, bearing capacities, seismic design parameters, and structural pavement section considerations.

UNR Living Learning Center | Reno Nevada
The Living Learning Center at the University of Nevada, Reno offers a contemporary living and learning environment to help our students make a successful transition to the working environment. One of the first dormitory environments that offers the convenience of living facilities in close proximity to teachers and research staff, this 6 story facility provides a contemporary approach to education that encompasses the learning, the working, and the living. Mischelle was responsible for the geotechnical design considerations associated with this project. The steep cross-gradient of the property required some special considerations for foundations and retaining structures.

Item 8C147
Mischelle “Mickey” Smith, PE, GE (continued)

Page 5 ends

RENEWABLE ENERGY
PabcoSolar | Las Vegas, Nevada
Responding to the Client’s demand for a fast track geotechnical report, the geotechnical investigation/report and pile load testing program were completed within one month for this 300 acre photovoltaic site. The presence of gypsic and gypsiferous soils presented unique concerns to the design of the project. Mischelle was responsible for formulation of geotechnical design considerations and identification of geologic hazards associated with the development of the project. In addition, the fast track timeline helps to highlight Wood Rodger’s commitment to our clients’ needs.

Fresno County Solar Project, GA Solar | Fresno, California Wood Rodgers is currently providing site feasibility services to GA Solar on a 320-acre property in Fresno County, California. Mrs.

Smith is leading the geotechnical investigation for the project site. Wood Rodgers scope of services has included preliminary engineering, geotechnical engineering, ALTA mapping, and topographic survey. Due to the timing and proprietary information relative to the project, the details of the developer and project cannot be shared at this time.

San Bernardino Solar Project, Axio Power| San Bernardino, California Wood Rodgers is currently providing site feasibility services to Axio Power on a 150-acre property in San Bernardino County, California.

Wood Rodgers scope of services has included preliminary hydrology, geotechnical, and structural feasibility analysis. Due to the timing and proprietary information relative to the project, the details of the developer and project cannot be shared at thistime. 20 MW Photovoltaic Project, Blue Oak Energy | Las Vegas, Nevada Mrs. Smith was responsible for the review of geotechnical reports and data. Provide value engineering and alternative design recommendations and excavatability review of geotechnical conditions presented in the final report. Also Wood Rodgers provided civil scope of services including the design of the overall grading of the 150± acre site, pad design for tracker blocks, Operations and Maintenance building and medium voltage substation, on-site and off-site roadway and drainage improvements. The project required Wood Rodgers to design an economically viable grading approach that would not detrimentally affect the operating performance of the PV tracker units due to shading. Wood Rodgers created a 3D earthwork model for the site and worked closely with the solar resource modeling team member to asses the overall performance of the PV system. Additionally, Wood Rodgers provided Blue Oak Energy with an analysis of the on-site soil conditions, which resulted in a value engineering decision making process for the design of the tracker foundations. Wood Rodgers analysis of the soil condition and foundations led to an approximate 40% savings in material costs. Due to the timing and proprietary information relative to the project, the details of the developer and project cannot be shared at this time.

Item 8C148
Dan Rich, PE
Dan has thirty years of experience in planning, designing, and evaluating processes for wastewater and sludge treatment. He specializes in treatment process development, process modeling and design, performance evaluation, troubleshooting, and NPDES compliance. He has served as Project Manager for over twenty sewer master plans and twelve wastewater treatment plant designs for cities across California. Dan cofounded Nexgen Utility Management in 2005 and is a Vice President of the firm. In his spare time, Dan serves as an elected member of the San Juan Water District which provides treated water to 300,000 people in Placer and Sacramento Counties.

RELEVANT PROJECT EXPERIENCE
Coke Street Pump Station Upgrades Mapping –West Sacramento, CA| Dan served as Project Manager for design and construction of upgrades for two sewer pump stations (Coke Street and Triangle lift station upgrades had a combined construction cost of $1.42 million). Coordinated field surveying and mapping, condition assessment, hydraulic evaluation, coordinated with geotechnical engineering and structural sub-consultants.

Design included a new wet well made of fiber reinforced plastic (FRP), two submersible pumps, emergency bypass connection to the force main, emergency generators, FOG and odor control, and a secure concrete building. Provided constructability review, bid support, and engineering support during construction.

Pump Station Rehabilitation Projects –Auburn, CA |Dan is the Project Manager for four PS upgrades (Vista, Monicello, Vintage Oaks, Diamond Ridge) which included the following improvements:
• New standby generators
• Odor scrubbers
• New epoxy-coated pre-cast
wet wells
• New submersible pumps
• New SCADA and control
systems
Utilized Virtual Project Manager (VPM) and Wrike to manage project documentation and details, facilitate communication between all parties, and keep everyone informed of latest updates during the project.

Regional Sewer Project Pump Station Design -Wheatland, CA |NEXGEN performed an alternatives analysis to determine the best regionalization option for the City of Wheatland’s wastewater treatment. We determined that a pipeline to a neighboring community’s WWTP was the most cost-effective solution. NEXGEN is working with the City to determine the placement of the 3 pump stations required to transport Wheatland’s wastewater.

All three pump stations are being designed with submersible pumps, a “trench” style concrete wet well with epoxy liners to allow self-cleaning operation, grade valves and flow meter, alarms and operation tied to City SCADA, a control building, and an emergency generator or diesel pump. One station will have a sampling station and one station, located near a residential area, is being designed for chemical addition for odor and corrosion control.

Dan manages the project and coordinates regularly with project stakeholders: Yuba Water Agency, Yuba County, OPUD, LCWD, Wheatland staff, members of Wheatland’s City Council, and the City’s consultants preparing the financial plan and environmental documentation
Jackson Rancheria New Influent Pump Station and Headworks Design | The previous pump station had a number of deficiencies:
the pumps and pipes were overloaded, odors were traveling up the storm drainpipes and could be detected in the Rancheria parking lot, required significant maintenance, and access was on a road leading to many homes.

PROJECT ROLE
Wastewater Treatment Plant
Engineering

CLASSIFICATION
Principal Engineer for
Nexgen Utility Management

EDUCATION
B.S. Civil Engineering, University of
Colorado at Boulder, Boulder, CO
MBA, University of California at Davis,
Davis, CA
M.S. Sanitary Engineering, University
of California at Davis, Davis, CA

REGISTRATIONS/CERTIFICATIONS
Professional Civil Engineer No.56365,
State of California

YEARS OF EXPERIENCE
• 30 years total
Item 8C149
Dan Rich, PE (continued)

Page 2 ends

Dan oversaw the $100,000 design of the new influent pump station which included:
• Relocating the pump station to a less trafficked
location
• Three VSPs (two duty, one standby)
• Magnetic influent flow meter
• Emergency storage tank
• Carbon odor scrubber for odor control
• Plant influent sampler
• Small building for electrical control panels and
some chemical systems
• Two parallel 8-inch forcemains
• Magnesium hydroxide feed system for alkalinity
control (includes a storage tank with mixer and two
chemical metering pumps to meter magnesium
hydroxide slurry into the wet well)
NEXGEN also provided construction management, specialty inspection, and construction support for this project (2018).

WWTP Solids Dewatering and Pumping Systems Upgrades Project (2020 – 2023). –Auburn, CA|Dan was the Project Manager for design, bid support, and construction management services of this $5 million construction project.

The project includes:
• New 3,550 sq. ft. solids dewatering building to
house new dewatering facilities
• New 1,000 sq. ft. loading dock
• Upgrades to plant water pumps to provide
additional water supply capacity because of the
screw press and polymer water system demands.

WATER &WASTEWATER DESIGN EXPERIENCE
WWTP Solids Dewatering and Pumping Systems Upgrades Project (2020 – Current). –Auburn, CA|Dan is the Project Manager for design, bid support, and construction management services of this $5 million construction project.

The project includes:
• New 3,550 sq. ft. solids dewatering building to
house new dewatering facilities
• New 1,000 sq. ft. loading dock to accommodate
large solid waste trucks to haul dewatered solids to
the landfill
• The new building will house: the new screw press
equipment, chemical feed system, restroom, and
sampling facilities
• A new outlet box level transmitter and motor
operated outlet control valve will be installed at the
oxidation ditch outlet to minimize air entrainment
in the water during periods of high flow.
• New sewer to bypass the Pond 1B pump and
measure diverted flow using a Parshall flume
WWTP Improvements (2008- Current) –Woodland, CA| Since 2008, NEXGEN has served as the City of Woodland’s Wastewater Consultant and Dan has served as the City’s Project Manager for various plant improvement projects. In 2009 and 2014, Dan served as PM for NPDES permit renewals. In each renewal, the adopted permit limits became less restrictive. Each summer since 2010, Dan has served as the PM for sludge stabilization, drying, and hauling operations at the WWTP. The WWTP utilizes a novel system of facultative ponds which use solar energy/algae to digest and dry the solids. The stabilized solids are used for alternative daily cover at the nearby landfill. In 2015, Dan served as City advisor for a $1.4 million pond project that cement and lime treatsthe bottom of two 10-acre ponds and constructs various piping and valving improvements. In 2010-2013, Dan served as PM for improvements to the WWTP secondary system. The project included converting three 2 MG existing oxidation ditches to energy efficient fine bubble nitrifying/ denitrifying bioreactors. The project doubled the treatment capacity, cut power costs by half, fully nitrified and removed nitrates to below 10 mg/L, and improved effluent turbidity. The project construction cost was $15 million.

Dan also prepared documents for State Revolving Loans for WPCF upgrades in 2013 and two water recycling projects.

Treatment Improvements (2014- 2019) –Auburn, CA| Project Manager for a $10 million upgrade to the City of Auburn’s WWTP.

The secondary process upgrades will allow the city to treat 1.8 mgd to stringent ammonia and nitrate standards. The project includes new fine screens, a magnesium hydroxide feed system for alkalinity addition, a new return sludge pump station, and modifications to the stormwater pond system. The new 2.3 MG ditch is designed for maximum energy efficiency including 18-foot deep vertical walls, vertical aerators with by variable frequency drives, submersible mixers to mix contents during low load conditions, online nitrate and ORP sensors to match horsepower with influent loads, and a separate anoxic basin to remove nitrates and recover oxygen.

Item 8C150
Samuel W. Terry
Sam has over forty years of experience designing, planning, value engineering, modeling, documenting, operating, testing and troubleshooting electrical, mechanical, instrumentation and control systems. Sam has spent the last thirty years managing resources and people to meet clients’ project goals. Sam is a register Electrical Engineer and six states (including California) and a Registered Control System Engineer in California.

Sam is responsible for plan review on all projects and for design and project management of municipal, industrial and large institutional projects. An expert in the application of variable frequency drives, and their associated control systems, he is also proficient in the use of numerous field test instruments.

Sam and his staff have demonstrated a true talent for communicating with clients, vendors, and contractors, by evaluating real issues, generating workable alternatives and client orientated solutions and then, repeatedly, incorporating them into final engineering design. ECS provides quality work, while meeting deadlines in a branch of engineering that dictates very quick turnaround, we also follow our projects through construction by providing construction support, factory and field over-site testing witnessing, and inspection services.

ECS Engineering, Incorporated specializes in the Electrical and Control Systems Engineering of industrial facilities, water/wastewater treatment plants and pump stations. We apply “Total Systems Engineering" and, problem solving solutions for power distribution, communications, networking, SCADA systems, control systems, programmable logic controllers, remote telemetry units, motor controls, variable frequency drives and instrumentation. We also provide design for prime, cogeneration, standby and emergency on-site power generation.

ECS Engineering is not managed as a traditional engineering firm. We have a virtual office, using 21st century technology. Most of our projects are in California and Nevada, with occasional projects in Arizona, Hawaii, Oregon, and Washington. Technology allows us to be close to our clients and projects at all times. When confronting a design problem, our firm believes the solution must not only address the technical issues but should also considerthe economic issues and scheduling constraints.

Sam has been using SKM software for over 30 years and ETAP for over five years.

RELEVANT PROJECT EXPERIENCE
ColfaxWWTP DAF/SAF Project – Colfax, CA |
The electrical design work at the WWTP for the DAF/SAF project electrical loads and SCADA monitoring for the new system and related equipment. The DAF/SAF system wasskid mounted including motor controls, pumps, compressors, electric actuated valves, controls and instruments, as well as replacement of the Pond 3 Irrigation Booster Pump Station and upgrade of the CCB Pump Station motor controls and related instrumentation. Legacy switchboard/ MCC gear was replaced and the existing 3- water/NPW Pumpswere automated. The existing main plant PLC, SCADA and related computer hardware was also replaced.

Various Sewer Pump Station Projects in the Greater Sacramento Region (past three years).

The electrical design work generally included new electrical service, transfer switch, motor controls, low voltage panelboard, PLC/RTU, instrumentation and site lighting. New duplex or triplex pumps ranged from 5 to 385 HP submersible sewage pumps with pump protection relays and soft starter motor controls. The designs often include generators, load bank, crane panel and provisions for a future odor control.

Lakeside Sewer Pump Station – Sutter County
Arista Del Sol Sewer Pump Station – Rancho Cordova
Liberty Ranch Sewer Pump Station –Galt
Elliott Ranch Sewer Lift Station –Galt
Summerfield Sewer Pump Station –Galt
Metrolink Stormwater Pump Station –Glendora
Metrolink Stormwater Pump Station – San Dimas
Turkey Creek Sewer Pump Station – Lincoln
Garcia Rivera Sewer Pump Station – Sacramento County
Amoruso Ranch Sewer Pump Station – Roseville

PROJECT ROLE
Electrical Engineer

EDUCATION
BS, College of Notre Dame, 1984
Tech, US Navy, 1980

PROFESSIONAL ORGANIZATIONS
Institute of Electrical Electronic
Engineers

YEARS OF EXPERIENCE
• 45 years total
Item 8C151
Allen Johnson
Allen has over 20 years of experience as a consultant and city manager, specializing in land development, labor contracts, economic development, and public finance. As a consultant with Al Johnson Consulting LLC since 2003, he has advised private and public projects, negotiated developmentrelated agreements, and served as an expert witness. In his roles with the City of Roseville, California, he managed a $300 million budget, oversaw utility operations, and led the implementation of major development projects. Allen also has extensive experience in administrative services and personnel management, having directed departments in both Roseville and Yuba City.

RELEVANT PROJECT EXPERIENCE
Consultant -Al Johnson Consulting LLC –Roseville , CA | Since 2003, Allen has been a consultant to private development firms and public agencies, specializing in land development, labor contracts, economic development, and public finance. He has advised on private and public projects, including specific plans, development agreements, infrastructure planning, financing plans, fee structures, and retail, office, and industrial projects. As a negotiator, he has handled development-related projects such as condemnation actions, tax sharing agreements, public financing, labor negotiations, and LAFCO annexations. Additionally, Allen has trained on management topics like negotiation techniques, infrastructure planning and financing, park and recreation development, and regional issues resolution. He also serves as an expert witness for development-related issues.

City Manager, City of Roseville – Roseville, CA | As City Manager of Roseville, California, Allenmanaged day-to-day operations for a full-service city with a $300 million annual budget and 1,000 employees. He oversaw utility operations, including city-owned electric, water, regional wastewater, and refuse services. Allen negotiated agreements and led the implementation of nine specific plan developments ranging from 500 to 3,000 acres. He also negotiated public-private partnerships, project-specific development agreements for retail and manufacturing investments, joint power agency financing plans for public projects, and fee agreements.

Additionally, Allen served as a speaker and trainer at community, conference, and retreat forums, addressing up to 1,000 participants on various management, development, and regional issues.

Administrative Services Director, City of Roseville – Roseville, CA | As the Administrative Services Director for the City of Roseville, Allen planned, directed, and reviewed the activities and operations of the city's Administrative Services Department, which included Personnel, Risk Management, Information Technology, Public Information, Purchasing, Garage, Central Stores, Labor Relations, and City Clerk offices. He was responsible for overseeing major city-wide projects involving all city departments and served as Acting City Manager in the absence of the City Manager.

Director of Personnel, City of Roseville –Roseville, CA |As Director of Personnel for the City of Roseville, Allen planned, directed, and reviewed the activities and operations of the city's Personnel Division. His duties included managing labor relations, recruitment and selection, risk management, training programs, workers' compensation, safety programs, self-insurance programs, and employee benefit programs.

Director of Personnel, City of Yuba City – Yuba City, CA | As Director of Personnel for the City of Yuba City, Allen planned, directed, and reviewed the activities and operations of the city's Personnel Division. His duties included managing labor relations, recruitment and selection, risk management, training programs, workers' compensation, safety programs, self-insurance programs, and employee benefit programs.

PRESENTATIONS
State of the City; Roseville Rotary Club, Roseville, CA; December 2002 State of the City; Roseville/Granite Bay Chamber of Commerce Board of Directors Retreat; Greenhorn Creek, CA; (1998-2002)

PROJECT ROLE
Annexation Director

EDUCATION
BS, Sacramento State University,
Sacramento, 1976
MS, Public Administration, Golden
Gate University, 1985

PROFESSIONAL ORGANIZATIONS
American Leadership Forum (ALF)
Senior Fellow Status, April 2000)

YEARS OF EXPERIENCE
• 45 years total
Item 8C152
Allen Johnson (continued)

Page 2 ends

Council-Manager Relations; Municipal Management Association of Northern California Annual Conference; Sonoma, CA; October 2002
Communicating the Value of Parks and Recreation to Decision makers (keynote address); National Recreation and Park Association Annual Conference; La Jolla, CA; October 2002
Negotiation Techniques; National Recreation and Park Association Annual Conference; La Jolla, CA; October (1995-2004) Roseville Redevelopment Agency Bond Rating Presentation;New York, NY; September 2002 City of Roseville: Organization and Budgeting; Leadership Roseville/Roseville Chamber of Commerce; September (1997-2003) (2017)
Sales Tax Sharing Legislation and Utility Users Tax; Sacramento Regional Economic Forum; Chico, CA; June 2002 Roseville Update; Annual Keynote Address to 1,000 members of Chamber of Commerce; Roseville, CA; (1998-2002) AB 680 – A Local Government Perspective; California State University Alumni Association; Sacramento, CA: February 2002 Leadership Forum for Board of Directors; Community Services District, El Dorado Hills; February 2004 Keynote Address, Lambda Alpha Society, January 2005
Panelist, Placer County Workforce Symposium, April 2005 Item 8C153
Marcus J. Lo Duca
For the past 30 years, Marcus J. Lo Duca has focused exclusively on land use and environmental law, representing residential, commercial, and industrial developers and property owners across the greater Sacramento region and various parts of California. He handles all aspects of the land use entitlement process, drafts development agreements, and manages administrative processes before public bodies. His expertise includes State Planning and Housing laws, the Subdivision Map Act, and environmental laws related to development projects, including CEQA, wetlands, and endangered species. His clients range from the nation's largest homebuilders and retailers to leading land developers and major builders of apartments, offices, hotels, and industrial complexes. He has entitled approximately 500 projects in his 38-year career, including specific plans, regional shopping centers, apartment complexes, offices, hotels, recreational venues, and industrial parks. He has also served as special counsel to several cities and counties on land use planning matters and has expertise in redevelopment law, having represented various redevelopment agencies in California.

RELEVANT PROJECT EXPERIENCE
He has served on the boards of directors of over 30 non-profit organizations, acting as an officer in 16 of these organizations, including terms as president of the Roseville Chamber of Commerce, the Lincoln Chamber of Commerce, the Placer SPCA, the Associates Council of the Building Industry Association, the Roseville Police Activities League, Inc. (12 terms), the Roseville Community Crime Stoppers Foundation (2 terms), the alumni associations of California State University, Sacramento, and of Jesuit High School(3 terms), and three business association political action committees. He has served on several local government task forces and committees, with appointments from the cities of Roseville, Rocklin (administrative appeals hearing officer), and CitrusHeights, and the County of Placer. For four years, he was a member of the faculty of the Government Department at California State University, Sacramento. He has also represented over 20 non-profit organizations on a pro bono basis in his career. He has been awarded numerous professional honors from both business groups and educational institutions.

PROJECT ROLE
Annexation Legal Adviser

EDUCATION
BS, Sacramento State University,
Sacramento, CA
MA, Government, Sacramento State
University, Sacramento, CA
JS, UC Berkley’s Boalt Hall of Law,
Berkley, CA

YEARS OF EXPERIENCE
• 38 years
Item 8C154
Roseanne Chamberlain
Roseanne has extensive experience in managing and coordinating municipal projects and inter-agency collaborations. As Executive Officer for Amador LAFCO from 2006 to 2023, she handled various organizational changes, CEQA compliance, project management, annexations, and district formations. She led inter-agency cooperation, conducted municipal service reviews, and managed administrative systems. From 1996 to 2006, she served as Executive Officer for El Dorado LAFCO, where she executed similar duties and facilitated the incorporation of the City of El Dorado Hills.

Additionally, Roseanne has held leadership roles in the Sacramento Local Agency Formation Commission and the California Association LAFCOs and served as Interim Executive Officer for Solano LAFCO in 2017.

RELEVANT PROJECT EXPERIENCE
Executive Officer, Amador LAFCO – Amador, CA | Roseanne has handled numerous organizational changes, including CEQA compliance, project management, annexations, reorganizations, and district formations or dissolutions. As an inter-agency liaison, she coordinated city-county staff cooperation for cost savings. She conducted municipal service reviews and adopted and amended Spheres of Influence. Roseanne led the Amador LAFCO start-up to implement Hertzberg changes (2000) and establish LAFCO as a non-county agency. She developed administrative systems, procedures, record management systems, and commission policies, and provided education and training to county, city, and district staff on LAFCO requirements and functions.

Executive Officer, El Dorado LAFCO – El Dorado, CA |During her tenure, Roseanna managed numerous organizational changes, including CEQA compliance, project management, annexations, reorganizations, and district formations or dissolutions. She provided education and training to county, city, and district staff on LAFCO requirements and functions. She conducted municipal service reviews and adopted and amended Spheres of Influence. Roseanna set up independent accounting, financial, HR, and business processes and services for LAFCO. Additionally, she was involved in the incorporation efforts of the City of El Dorado Hills, overseeing revenue neutrality, CEQA compliance, and fiscal analysis with consultant advisors.

Administrative Services Director, City of Roseville – Roseville, CA | As the Administrative Services Director for the City of Roseville, John planned, directed, and reviewed the activities and operations of the city's Administrative Services Department, which included Personnel, Risk Management, Information Technology, Public Information, Purchasing, Garage, Central Stores, Labor Relations, and City Clerk offices. He was responsible for overseeing major city-wide projects involving all city departments and served as Acting City Manager in the absence of the City Manager.

ADDITIONAL HISTORY
Sacramento Local Agency Formation Commission: Public Member, Chairman, 1988-1996 California Association LAFCOs, Executive Board/Chairmanmultiple years Interim Executive Officer, Solano LAFCO, January 2017- August 2017, including recruitment and hiring permanent EO

REFERENCES
Pat Crew, Chairman Amador LAFCO 2017 to present (Amador County Board of Supervisors); [email protected] or (209) 304- 9345
Jose Henriquez, Executive Officer, Sacramento LAFCO, 916-874-6458 Michelle MacIntyre, Executive Officer, Placer LAFCO, (530) 889-4097Sales Tax Sharing Legislation and Utility Users Tax;

PROJECT ROLE
LAFCo Liaison

EDUCATION
BS, Sacramento State University,
Sacramento, 1976
MS, Public Administration, Golden
Gate University, 1985

PROFESSIONAL ORGANIZATIONS
American Leadership Forum (ALF)
Senior Fellow Status, April 2000)

YEARS OF EXPERIENCE
• 36 years
Item 8C155
DPFG is a national real estate consulting firm that represents land developers and builders on many land use related matters. The firm specializes in providing land development and financing solutions in the local market for its clients which include, but are not limited to, to the following areas:

Consulting Milestones:
 Completed over 2,565 Land Secured Public Financings with over $16 billion in bonds.  Completed over 550 Fiscal Impact Analysis Reviews and Reports.  Negotiated over 350 School Mitigation Agreements.
 Completed over 150 Public Facilities Financing Reports.  Completed over 600 Project Cash Flows, Valuation and Feasibility Analysis.  Completed over 4,000 Disclosure Analysis Reviews and Reports.  Completed over 100 Redevelopment projects.
 Restructured over 100 Land Secured Public Financing Districts.  Completed over 4,000 Property Tax Appeals nationwide.  Look Back Diagnostic findings reached over $125 million.

The Management Team at DPFG has over 300 years of combined real estate experience in performing the firm’s core services and other general real estate consulting services as follows:

DPFG Executive Management Team:
 Chris Austin – Managing Principal 22 Years Experience  Chris Cole – Managing Principal 21 Years Experience
 Chris Lightburne – Managing Principal 33 Years Experience  Peter Pillar – Managing Principal 36 Years Experience DPFG Senior Management Team:
 Lucy Gallo – Managing Principal 21 Years Experience
 Rick Rosenberg – Managing Principal 41 Years Experience  Chris Hall – Principal 17 Years Experience
 Eric Quinlan – Sr. Manager 17 Years Experience
 Kelly Restelli – Sr. Manager 9 Years Experience
 Marc Santos – Sr. Manager 15 Years Experience
 Mary Lu – Sr. Manager 16 Years Experience
 Vanessa Stowe – Sr. Manager 9 Years Experience
 Zach Crawford – Sr. Manager 7 Years Experience
 Joey Lujan – Manager 11 Years Experience
 Manju Pokharel – Manager 9 Years Experience
 Matt Johnson – Manager 17 Years Experience
 Nathan Morris – Manager 12 Years Experience
 Ryan Hall – Manager 11 Years Experience
 Steve Johnston – Manager 10 Years Experience
DPFG has over 40 other professionals that are at work with the Management Team to help process and solve their client's jobs and problems.

Item 8C156
Shady Glen Consolidation Planning Grant ApplicationResolution __-2026 Wood Rodgers Agreement Amendment City of Colfax
City Council
Resolution № __-2026

AUTHORIZING THE CITY MANAGER OR DESIGNEE TO EXECUTE A

PROFESSIONAL SERVICES AGREEMENT WITH WOOD RODGERS TO PROVIDE

PLANNING AND DESIGN FOR SHADY GLEN COMMUNITY CONSOLIDATION

PROJECT
WHEREAS, The City of Colfax will enter into a Clean Water State Revolving Fund grant agreement with the State Water Resources Control Board (Water Board) for the planning and design of the Shady Glen Community Consolidation Project (Project) for $1,653,000; and, WHEREAS, The City would like Wood Rodgers to continue to provide management, planning and design for the Project based on the Planning Application approved by the Water Board; and, WHEREAS, Wood Rodgers provided a scope of work to provide the needed services with a not to exceed amount of $1,300,160.

NOW THEREFORE, BE IT RESOLVED the City Council of the City of Colfax authorizes the City Manager or designee to execute a professional services agreement with Wood Rodgers bases on their proposal; and,
BE IT FURTHER RESOLVED that the City Manager may not execute the agreement until the aforementioned grant agreement between the City and the Water Board is fully executed.

THE FOREGOING RESOLUTION WAS DULY AND REGULARLY ADOPTED at the Regular Meeting of the City Council of the City of Colfax held on the 11th day of February 2026 by the following vote of the Council:

AYES:

NOES:

ABSTAIN:

ABSENT:
_________________________________________
Caroline McCully, Mayor
ATTEST:
____________________________________
Ron Walker, Interim City Clerk
Item 8C157

← All documents from this meeting