GENERAL CONDITIONS
52 9) At the completion of work each day, leave the Project site in a clean, safe condition.
10) Comply with any stage construction and traffic handling plans. Access to residences and businesses shall be maintained at all times.

These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the Work involved in the preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefor.
e. Should damage to persons or property occur as a result of The Work, Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. The City shall be entitled to inspect and copy any such documentation, video, or photographs.

ARTICLE 28. CONTRACTORS MEANS AND METHODS
Contractor is solely responsible for the means and methods utilized to perform the Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.

ARTICLE 29. INSPECTOR’S FIELD OFFICE
a. The Contractor shall be responsible for providing the inspector’s field office. The Office shall be a substantial waterproof construction with adequate natural light and ventilation by means of stock design windows. Door shall have a key type lock or padlock clasp.

The office shall have heating and air conditioning and shall be equipped with a telephone, a telephone answering machine, and a fax machine at Contractor’s expense. b. A table satisfactory for the study of plans and two chairs shall be Provided by Contractor.

Contractor shall Provide and pay for adequate electric lights, local telephone service, and adequate heat and air conditioning for the field office until authorized removal.

ARTICLE 30. AUTHORIZED REPRESENTATIVES
The City shall designate representatives, who shall have the right to be present at the Project site at all times. The City may designate an inspector who shall have the right to observe all of the Contractor’s Work. The inspector is not authorized to make changes in the Contract Documents.

The inspector shall not be responsible for the Contractor’s failure to carry out The Work in accordance with the Contract Documents. Contractor shall provide safe and proper facilities for such access.

ARTICLE 31. HOURS OF WORK
a. Eight (8) hours of work shall constitute a legal day’s work. The Contractor and each subcontractor shall forfeit, as penalty to the City, twenty-five dollars ($25) for each worker employed in the execution of Work by the Contractor or any subcontractor for each day during which such worker is required or permitted to work more than eight (8)

Page 334 of 735 ends

GENERAL CONDITIONS
53 hours in any one day and forty (40) hours in any week in violation of the provisions of the Labor Code, and in particular, Section 1810 to Section 1815, except as provided in Labor Code Section 1815.
b. Work shall be accomplished on a regularly scheduled eight (8) hour per day work shift basis, Monday through Friday, between the hours of 7:00 a.m. and 5:00 p.m. c. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project site, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on City-observed holidays, unless otherwise Approved by the Engineer:
1) Powered Vehicles
2) Construction Equipment
3) Loading and Unloading Vehicles
4) Domestic Power Tool.

ARTICLE 32. PAYROLL RECORDS
a. Pursuant to Labor Code Section 1776, the Contractor and each subcontractor shall maintain weekly certified payroll records showing the name, address, social security number, work classification, straight time and overtime hours paid each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed in connection with the work. Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate.

Contractor shall also require subcontractor(s) to certify weekly payroll records under penalty of perjury.
b. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City. The Contractor shall also provide the following:
1) A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.
2) A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the Department of Industrial Relations (“DIR”).
c. The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.
d. Any copy of records made available for inspection and furnished upon request to the public shall be marked or obliterated in such a manner as to prevent disclosure of an

Page 335 of 735 ends

GENERAL CONDITIONS
54 individual’s name, address, and social security number. The name and address of the Contractor or any subcontractor shall not be marked or obliterated. e. In the event of noncompliance with the requirements of this Section, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notice specifying any item or actions necessary to ensure compliance with this section. Should noncompliance still be evident after such ten (10) day period, the Contractor shall, as a penalty to the City, forfeit Twenty-five Dollars ($25.00) for each day, or portion thereof, for each worker until strict compliance is effectuated. Upon the request of the DIR, such penalties shall be withheld from contract payments.

ARTICLE 33. PREVAILING RATES OF WAGES
a. The Contractor is aware of the requirements of Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “pubic works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Agreement from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov/dlsr/.

In the alternative, the Contractor may view a copy of the prevailing rates of per diem wages at the City. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.
b. The Contractor and each subcontractor shall forfeit as a penalty to the City not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the stipulated prevailing wage rate for any work done by him, or by any subcontract under him, in violation of the provisions of the Labor Code. The difference between such stipulated prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the stipulated prevailing wage rate shall be paid to each worker by the Contractor. c. Contractor shall post, at appropriate conspicuous points on the Project site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.
d. If the Work involves federal funds or otherwise requires compliance with the DavisBacon Fair Labor Standards Act, the Contractor and all its subcontractors shall comply with the higher of the state or federal prevailing wage rates.

Page 336 of 735 ends

GENERAL CONDITIONS
55 ARTICLE 34. EMPLOYMENT OF APPRENTICES
The Contractor’s attention is directed to the provisions of Sections 1777.5, 1777.6, and 1777.7 of the Labor Code concerning employment of apprentices by the Contractor or any subcontractor.

The Contractor shall obtain a certificate of apprenticeship before employing any apprentice pursuant to Section 1777.5, 1777.6, and 1777.7 of the Labor Code. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, the Administrator of Apprenticeships, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

ARTICLE 35. NONDISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY Pursuant to Labor Code Section 1735 and other applicable provisions of law, the Contractor and its subcontractors shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap.

ARTICLE 36. LABOR/EMPLOYMENT SAFETY
The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4.

WORKERS’ COMPENSATION INSURANCE
The Contractor shall Provide, during the life of this Contract, workers’ compensation insurance for all of the employees engaged in Work under this Contract, on or at the Project site, and, in case any of sublet Work, the Contractor shall require the subcontractor similarly to provide workers’ compensation insurance for all the latter’s employees as prescribed by State law. Any class of employee or employees not covered by a subcontractor’s insurance shall be covered by the Contractor’s insurance. In case any class of employees engaged in work under this Contract, on or at the Project site, is not protected under the Workers’ Compensation Statutes, the Contractor shall provide or shall cause a subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected. The Contractor is required to secure payment of compensation to his employees in accordance with the provisions of Section 3700 of the Labor Code. The Contractor shall file with the City certificates of his insurance protecting workers. Company or companies providing insurance coverage shall be acceptable to the City, if in the form and coverage as set forth in the Contract Documents.

ARTICLE 37. EMPLOYER’S LIABILITY INSURANCE
Contractor shall provide during the life of this Contract, Employer’s Liability Insurance, including Occupational Disease, in the amount of, at least, one million dollars ($1,000,000.00) per person per accident. Contractor shall provide City with a certificate of Employer’s Liability Insurance. Such insurance shall comply with the provisions of the Contract Documents. The

Page 337 of 735 ends

GENERAL CONDITIONS
56 policy shall be endorsed, if applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and contain a Waiver of Subrogation in favor of the City.

ARTICLE 38. COMMERCIAL GENERAL LIABILITY INSURANCE
a. Contractor shall procure and maintain during the life of this Contract and for such other period as may be required herein, at its sole expense, Commercial General Liability insurance coverage, including but not limited to, premises liability, contractual liability, products/completed operations if applicable, personal and advertising injury – which may arise from or out of Contractor’s operations, use, and management of the Project site, or the performance of its obligations hereunder. Policy limits shall not be less than $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess of such coverage, nor shall it limit Contractor’s indemnification obligations to the City, and shall not preclude the City from taking such other actions available to the City under other provisions of the Contract Documents or law.
c. Contractor shall make certain that any and all subcontractors hired by Contractor are insured in accordance with this Contract. If any subcontractor’s coverage does not comply with the foregoing provisions, Contractor shall indemnify and hold the City harmless from any damage, loss, cost, or expense, including attorneys’ fees, incurred by the City as a result thereof.
d. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.
e. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non-owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions, relating to liability for injury to or death of persons and damage to property. If the coverage contains one or more aggregate limits, a minimum of 50% of any such aggregate limit must remain available at all times; if over 50% of any aggregate limit has been paid or reserved, the City may require additional coverage to be purchased by Contractor to restore the required limits.

Contractor may combine primary, umbrella, and as broad as possible excess liability coverage to achieve the total limits indicated above. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents.

Page 338 of 735 ends

GENERAL CONDITIONS
57 ARTICLE 39. AUTOMOBILE LIABILITY INSURANCE
Contractor shall take out and maintain at all times during the term of this Contract Automobile Liability Insurance in the amount of, at least, one million dollars ($1,000,000). Such insurance shall provide coverage for bodily injury and property damage including coverage for non-owned and hired vehicles, in a form and with insurance companies acceptable to the City. Such insurance shall comply with the provisions of Article 30 below.

ARTICLE 40. BUILDER’S RISK [“ALL RISK”]
a. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s Risk [ “All Risk”] extended coverage insurance on all work, material, equipment, appliances, tools, and structures which are a part of the Contract and subject to loss or damage by fire, and vandalism and malicious mischief, in an amount to cover 100% of the replacement cost. The City accepts no responsibility until the Contract is formally accepted by the Governing Board for the work. The Contractor is required to file with the City a certificate evidencing fire insurance coverage.
b. Provide insurance coverage on completed value form, all-risk or special causes of loss coverage.
1) Insurance policies shall be so conditioned as to cover the performance of any extra work performed under the Contract.
2) Coverage shall include all materials stored on site and in transit. 3) Coverage shall include Contractor’s tools and equipment. 4) Insurance shall include boiler, machinery and material hoist coverage. c. Such insurance shall comply with the provisions of the Contract Documents.

ARTICLE 41. FORM AND PROOF OF CARRIAGE OF INSURANCE
a. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by the City Risk Manager. Carrier(s) shall have an A.M. Best rating of not less than an A:VIII. Insurance deductibles or self-insured retentions must be declared by the Contractor, and such deductibles and retentions shall have the prior written consent from the City. At the election of the City the Contractor shall either 1) reduce or eliminate such deductibles or self-insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses.
b. Contractor shall cause its insurance carrier(s) to furnish the City with either 1) a properly executed original Certificates(s) of Insurance and certified original copies of Endorsements effecting coverage as required herein, or 2) if requested to do so in writing by the City Risk Manager, provide original Certified copies of policies including all

Page 339 of 735 ends

GENERAL CONDITIONS
58 Endorsements and all attachments thereto, showing such insurance is in full force and effect. The City, its Director’s and officers, employees, agents or representatives are named as Additional Insureds and Provide a Waiver of Subrogation in favor of those parties. Further, said Certificates(s) and policies of insurance shall contain the covenant of the insurance carrier(s) that shall provide no less than thirty (30) days written notice be given to the City prior to any material modification or cancellation of such insurance. In the event of a material modification or cancellation of coverage, the City may terminate or Stop Work pursuant to the Contract Documents, unless the City receives, prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original policies, including all endorsements and attachments thereto evidencing coverages set forth herein and the insurance required herein is in full force and effect. Contractor shall not take possession, or use the Project site, or commence operations under this Agreement until the City has been furnished original Certificate(s) of Insurance and certified original copies of Endorsements or policies of insurance including all Endorsements and any and all other attachments as required in this Section. The original Endorsements for each policy and the Certificate of Insurance shall be signed by an individual authorized by the insurance carrier to do so on its behalf.
c. It is understood and agreed to by the parties hereto and the insurance company(s), that the Certificate(s) of Insurance and policies shall so covenant and shall be construed as primary, and the City’s insurance and/or deductibles and/or self-insured retentions or self-insured programs shall not be construed as contributory. d. The City reserves the right to adjust the monetary limits of insurance coverage’s during the term of this Contract including any extension thereof-if in the City’s reasonable judgment, the amount or type of insurance carried by the Contractor becomes inadequate. e. Contractor shall pass down the insurance obligations contained herein to all tiers of subcontractors working under this Contract.

ARTICLE 42. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
a. Time for Completion/Liquidated Damages. Work shall be commenced within ten (10) days of the date stated in the City’s Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The City is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by the City’s receipt or acceptance of the Contractor’s proposed earlier completion date. Furthermore, Contractor shall not, under any circumstances, receive additional compensation from the City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date. If The Work is not completed as stated in the Contract Documents, it is understood that the City will suffer damage. In accordance with Government Code section 53069.85, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum stipulated in the Contract for each day of delay until The Work is fully completed.

Page 340 of 735 ends

GENERAL CONDITIONS
59 Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages. b. Inclement Weather. Contractor shall abide the Engineer’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule.
c. Extension of Time. Contractor shall not be charged liquidated damages because of any delays in completion of The Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its subcontractors or suppliers).

Contractor shall within five (5) Days of identifying any such delay notify the City in writing of causes of delay. The City shall ascertain the facts and extent of delay and grant extension of time for completing The Work when, in its judgment, the facts justify such an extension. Time extensions to the Project shall be requested by the Contractor as they occur and without delay. No delay claims shall be permitted unless the event or occurrence delays the completion of the Project beyond the Contract completion date. d. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for which the City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable City delay, including delays caused by items that are the responsibility of the City pursuant to Government Code section 4215, shall be based on actual costs only, no proportions or formulas shall be used to calculate any delay damages.

ARTICLE 43. COST BREAKDOWN AND PERIODIC ESTIMATES
Contractor shall furnish on forms Approved by the City:
a. Within ten (10) Days of award of the Contract a detailed estimate giving a complete breakdown of the Contract price;
b. A monthly itemized estimate of Work done for the purpose of making progress payments.

In order for the City to consider and evaluate each progress payment application, the Contractor shall submit a detailed measurement of Work performed and a progress estimate of the value thereof before the tenth (10th) Day of the following month. c. Contractor shall submit, with each of its payment requests, an adjusted list of actual quantities, verified by the Engineer, for unit price items listed, if any, in the Bid Form. d. Following the City’s Acceptance of the Work, the Contractor shall submit to the City a written statement of the final quantities of unit price items for inclusion in the final payment request.
e. The City shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.

Page 341 of 735 ends

GENERAL CONDITIONS
60 Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.

ARTICLE 44. MOBILIZATION
a. When a bid item is included in the Bid Form for Mobilization, the costs of Work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress estimate (“Initial Mobilization”). When no bid item is provided for “Initial Mobilization,” payment for such costs will be deemed to be included in the other items of The Work.
b. Payment for Mobilization based on the lump sum provided in the Bid Form, which shall constitute full compensation for all such Work. No payment for Mobilization will be made until all of the listed items have been completed to the satisfaction of the Engineer.

The scope of the Work included under Mobilization shall include, but shall not be limited to, the following principal items:

1. Obtaining and paying for all bonds, insurance, and permits.

2. Moving on to the Project site of all Contractor’s plant and equipment required for first month’s operations.

3. Installing temporary construction power, wiring, and lighting facilities.

4. Establishing fire protection system.

5. Developing and installing a construction water supply.

6. Providing and maintaining the field office trailers for the Contractor and the Engineer, complete, with all specified furnishings and utility services including telephones, telephone appurtenances, computer and printer, and copying machine.

7. Providing on-site communication facilities for the Owner and the Engineer, including telephones, radio pagers, and fax machines.

8. Providing on-site sanitary facilities and potable water facilities as specified per Cal-OSHA and these Contract Documents.

9. Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work. All such storage shall meet manufacturer’s specified storage requirements, and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security.

10. Arranging for and erection of Contractor’s work and storage yard.

Page 342 of 735 ends

GENERAL CONDITIONS
61 11. Posting all OSHA required notices and establishment of safety programs per CalOSHA.

12. Full-time presence of Contractor’s superintendent at the job site as required herein.

13. Submittal of Construction Schedule as required by the Contract Documents.

ARTICLE 45. PAYMENTS
a. The City shall make monthly progress payments following receipt of undisputed and properly submitted payment requests. Contractor shall be paid a sum equal to ninety percent (90%) of the value of Work performed up to the last day of the previous month, less the aggregate of previous payments.
b. The Contractor shall, after the full completion of The Work, submit a final payment application. All prior progress estimates shall be subject to correction in the final estimate and payment.
c. Unless otherwise required by law, the final payment of ten percent (10%) of the value of the Work, if unencumbered, shall be paid no later than sixty (60) Days after the date of recordation of the Notice of Completion.
d. Acceptance by Contractor of the final payment shall constitute a waiver of all claims against the City arising from this Contract.
e. Payments to the Contractor shall not be construed to be an acceptance of any defective work or improper materials, or to relieve the Contractor of its obligations under the Contract Documents.
f. The Contractor shall submit with each payment request the Contractor’s conditional waiver of lien for the entire amount covered by such payment request, as well as a valid unconditional waiver of lien from the Contractor and all subcontractors and materialmen for all work and materials included in any prior invoices. Waivers of lien shall be in the forms prescribed by California Civil Code Section 3262. Prior to final payment by the City, the Contractor shall submit a final waiver of lien for the Contractor’s work, together with releases of lien from any subcontractor or materialmen.

ARTICLE 46. PAYMENTS WITHHELD AND BACKCHARGES
In addition to amounts which the City may retain under other provisions of the Contract Documents the City may withhold payments due to Contractor as may be necessary to cover:
a. Stop Notice Claims.
b. Defective work not remedied.
c. Failure of Contractor to make proper payments to its subcontractors or suppliers.

Page 343 of 735 ends

GENERAL CONDITIONS
62 d. Completion of the Contract if there exists a reasonable doubt that the work can be completed for balance then unpaid.
e. Damage to another contractor or third party.
f. Amounts which may be due the City for claims against Contractor. g. Failure of Contractor to keep the record (“as-built”) drawings up to date. h. Failure to provide updates on the construction schedule. i. Site clean up.
j. Failure of the Contractor to comply with requirements of the Contract Documents. k. Liquated damages.
l. Legally permitted penalties.

Upon completion of the Contract, the City will reduce the final Contract amount to reflect costs charged to the Contractor, backcharges or payments withheld pursuant to the Contract Documents.

ARTICLE 47. CHANGES AND EXTRA WORK
a. Change Order Work.
1) The City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, the Contract amount and Contract time being adjusted accordingly. All such changes in the Work shall be authorized by Change Order, and shall be performed under the applicable conditions of the Contract Documents. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in the Contract amount or the Contract time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.
2) All claims for additional compensation to the Contractor shall be presented in writing before the expense is incurred and will be adjusted as provided herein.

No work shall be allowed to lag pending such adjustment, but shall be promptly executed as directed, even if a dispute arises. No claim will be considered after the work in question has been done unless a written contract change order has been issued or a timely written notice of claim has been made by Contractor.

Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done. Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included

Page 344 of 735 ends

GENERAL CONDITIONS
63 in the Contract, and shall be subject to all terms, conditions and provisions of the original Contract.
3) Owner Initiated Change. The Contractor must submit a complete cost proposal, including any change in the Contract time, within seven (7) Days after receipt of a scope of a proposed change order, unless the City requests that proposals be submitted in less than seven (7) Days.
4) Contractor Initiated Change. The Contractor must give written notice of a proposed change order required for compliance with the Contract Documents within seven (7) Days of discovery of the facts giving rise to the proposed change order.
5) Whenever possible, any changes to the Contract amount shall be in a lump sum mutually agreed to by the Contractor and the City.
6) Price quotations from the Contractor shall be accompanied by sufficiently detailed supporting documentation to permit verification by the City. 7) If the Contractor fails to submit the cost proposal within the seven (7) Day period (or as requested), the City has the right to order the Contractor in writing to commence the work immediately on a force account basis and/or issue a lump sum change to the contract price in accordance with the City’s estimate of cost. If the change is issued based on the City estimate, the Contractor will waive its right to dispute the action unless within fifteen (15) Days following completion of the added/deleted work, the Contractor presents written proof that the City’s estimate was in error.
8) Estimates for lump sum quotations and accounting for cost-plus-percentage work shall be limited to direct expenditures necessitated specifically by the subject extra work, and shall be segregated as follows:
(a) Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the extra work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from Federal, State or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the extra work cost will not be permitted unless the contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental.
(b) Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight and delivery. Materials cost shall be based upon supplier or manufacturer’s invoice. If invoices or other satisfactory

Page 345 of 735 ends

GENERAL CONDITIONS
64 evidence of cost are not furnished within fifteen (15) Days of delivery, then the Engineer shall determine the materials cost, at its sole discretion. (c) Tool and Equipment Use. No payment will be made for the use of small tools, tools which have a replacement value of $1,000 or less. Regardless of ownership, the rates to be used in determining equipment use costs shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, at the time the work is performed.
(d) Overhead, Profit and Other Charges. The mark-up for overhead (including supervision) and profit on work added to the Contract shall be according to the following:
i. “Net Cost” is defined as consisting of costs of labor, materials and tools and equipment only excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and subcontractors at cost only, without mark-up. ii. For Work performed by the Contractor’s forces the added cost for overhead and profit shall not exceed fifteen (15%) percent of the Net Cost of the Work.
iii. For Work performed by a subcontractor, the added cost for overhead and profit shall not exceed fifteen (15%) percent of the Net Cost of the Work to which the Contractor may add five (5%) percent of the subcontractor’s Net Cost.
iv. For Work performed by a sub-subcontractor the added cost for overhead and profit shall not exceed fifteen (15 %) percent of the Net Cost for Work to which the subcontractor and general contractor may each add an additional five (5 %) percent of the Net Cost of the lower tier subcontractor.
iv. No additional mark up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by City exceed twenty-five (25%) percent of the Net Cost as defined herein.
9) For added or deducted Work by subcontractors, the Contractor shall furnish to the City the subcontractor’s signed detailed estimate of the cost of labor, material and equipment, including the subcontractor markup for overhead and profit. The same requirement shall apply to sub-subcontractors.
10) For added or deducted work furnished by a vendor or supplier, the Contractor shall furnish to the City a detailed estimate or quotation of the cost to the Contractor, signed by such vendor or supplier.

Page 346 of 735 ends

GENERAL CONDITIONS
65 11) Any change in The Work involving both additions and deletions shall indicate a net total cost, including subcontracts and materials. Allowance for overhead and profit, as specified herein, shall be applied if the net total cost is an extra; overhead and profit allowances shall not be applied if the net total cost is a credit.

The estimated cost of deductions shall be based on labor and material prices on the date the Contract was executed.
12) Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the change order for work. No claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s change order form in an attempt to reserve additional rights.
13) If the City disagrees with the proposal submitted by Contractor, it will notify the Contractor and the City will provide its opinion of the appropriate price and/or time extension. If the Contractor agrees with the City, a change order will be issued by the City. If no agreement can be reached, the City shall have the right to issue a unilateral change order setting forth its determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work.

Such determination shall become final and binding if the Contractor fails to submit a claim in writing to the City within fifteen (15) Days of the issuance of the unilateral change order, disputing the terms of the unilateral change order. 14) No dispute, disagreement or failure of the parties to reach agreement on the terms of the change order shall relieve the Contractor from the obligation to proceed with performance of the work, including extra work, promptly and expeditiously. 15) Any alterations, extensions of time, extra work or any other changes may be made without securing consent of the Contractor’s surety or sureties.

ARTICLE 48. OCCUPANCY
The City reserves the right to occupy or utilize any portion of The Work at any time before completion, and such occupancy or use shall not constitute Acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.

ARTICLE 49. INDEMNIFICATION
Contractor shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, agents, employees, and representatives free and harmless from any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages or injuries, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, to the extent arising out of or incident to any acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Work or this Contract,

Page 347 of 735 ends

GENERAL CONDITIONS
66 including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorneys fees and other related costs and expenses.

Contractor shall defend, at Contractor’s own cost, expense and risk, with counsel of City’s choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its officials, officers, agents, employees and representatives. To the extent of its liability, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City, its officials, officers, employees, agents, employees and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse City, its officials, officers, agents, employees and representatives for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code Section 2782.

ARTICLE 50. RECORD (“AS BUILT”) DRAWINGS
a. Contractor shall prepare and maintain a complete set of record drawings (herein referred to as “as-builts”) and shall require each trade to prepare its own as-builts. The as-builts must show the entire site for each major trade, including but not limited to water, sewer, electrical, data, telephone, cable, fire alarm, gas and plumbing. Contractor shall mark the as-builts to show the actual installation where the installation varies from the Work as originally shown. Contractor shall mark whichever drawings are most capable of showing conditions fully and where shop drawings are used, Contractor must record a cross-reference at the corresponding location on the contract drawings. Contractor shall give particular attention to concealed elements that would be difficult to measure and record at a later date. Contractor shall use colors to distinguish variations in separate categories of The Work.
b. Contractor shall note related change order numbers where applicable. Contractor shall organize as-builts into manageable sets, bound with durable paper cover sheets and shall print suitable title, dates and other identification on the cover of each set. Contractor to also provide an electronic version of the as-builts. The suitability of the as-builts will be determined by the Engineer.

ARTICLE 51. RESOLUTION OF CONSTRUCTION CLAIMS
a. In accordance with Public Contract Code Sections 20104 et seq. and other applicable law, public works claims of $375,000 or less which arise between the Contractor and the City shall be resolved under the following the statutory procedure unless the City has elected to resolve the dispute pursuant to Public Contract Code Section 10240 et seq. b. All Claims: All claims shall be submitted in writing and accompanied by substantiating documentation. Claims must be filed on or before the date of final payment unless other notice requirements are provided in the contract. "Claim" means a separate demand by the claimant for (1) a time extension, (2) payment of money or damages arising from work done by or on behalf of the claimant and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled, or (3) an amount the payment of which is disputed by the City.

Page 348 of 735 ends

GENERAL CONDITIONS
67 c. Claims Under $50,000. The City shall respond in writing to the claim within 45 days of receipt of the claim, or, the City may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses or claims the City may have. If additional information is needed thereafter, it shall be provided upon mutual agreement of the City and the claimant. The City's written response shall be submitted 15 days after receiving the additional documentation, or within the same period of time taken by the claimant to produce the additional information, whichever is greater.
d. Claims over $50,000 but less than or equal to $375,000. The City shall respond in writing within 60 days of receipt, or, may request in writing within 30 days of receipt of the claim, any additional documents supporting the claim or relating to defenses or claims the City may have against the claimant. If additional information is needed thereafter, it shall be provided pursuant to mutual agreement between the City and the claimant. The City's response shall be submitted within 30 days after receipt of the further documents, or within the same period of time taken by the claimant to produce the additional information or documents, whichever is greater. The Contractor shall make these records and documents available at all reasonable times, without any direct charge. e. The Contractor will submit the claim justification in the following format:
1) Summary of claim merit and price, and Contract clause pursuant to which the claim is made.
2) List of documents relating to claim
(a) Specifications
(b) Drawings
(c) Clarifications (Requests for Information)
(d) Schedules
(e) Other
3) Chronology of events and correspondence
4) Analysis of claim merit
5) Analysis of claim cost
6) Analysis of time impact analysis in CPM format
7) Cover letter and certification of validity of the claim f. If the claimant disputes the City's response, or if the City fails to respond within the statutory time period(s), the claimant may so notify the City within 15 days of the receipt

Page 349 of 735 ends

GENERAL CONDITIONS
68 of the response or the failure to respond, and demand an informal conference to meet and confer for settlement. Upon such demand, the City shall schedule a meet and confer conference within 30 Days.
g. If following the meet and confer conference, the claim or any portion thereof remains in dispute, the claimant may file a claim pursuant to Government Code 900 et seq. and Government Code 910 et seq. For purposes of those provisions, the time within which a claim must be filed shall be tolled from the time the claimant submits the written claim until the time the claim is denied, including any time utilized for the meet and confer conference.
h. Submission of a claim, properly certified, with all required supporting documentation, and written rejection or denial of all or part of the claim by City, is a condition precedent to any action, proceeding, litigation, suit, general conditions claim, or demand for arbitration by Contractor.

ARTICLE 52. CITY’S RIGHT TO TERMINATE CONTRACT
a. Termination for Cause: The City may, without prejudice to any other right or remedy, serve written notice upon Contractor of its intention to terminate this Contract if the Contractor: (i) refuses or fails to prosecute The Work or any part thereof with such diligence as will ensure its completion within the time required; (ii) fails to complete The Work within the required time; (iii) should file a bankruptcy petition or be adjudged a bankrupt; (iv) should make a general assignment for the benefit of its creditors; (v) should have a receiver appointed; (vi) should persistently or repeatedly refuse or fail to supply enough properly skilled workers or proper materials to complete the work; (vii) should fail to make prompt payment to subcontractors or for material or labor; (viii) persistently disregard laws, ordinances, other requirements or instructions of the City; or (ix) should violate any of the provisions of the Contract Documents.

The notice of intent to terminate shall contain the reasons for such intention to terminate.

Unless within ten (10) Days after the service of such notice, such condition shall cease or satisfactory arrangements (acceptable to the City) for the required correction are made, this Contract shall be terminated. In such case, Contractor shall not be entitled to receive any further payment until the Project has been finished. The City may take over and complete The Work by any method it may deem appropriate. Contractor and its surety shall be liable to the City for any excess costs or other damages incurred by the City to complete the Project. If the City takes over The Work, the City may, without liability for so doing, take possession of and utilize in completing The Work such materials, appliances, plant, and other property belonging to the Contractor as may be on the Project site.
b. Termination For Convenience: The City may terminate performance of The Work in whole or, in part, if the City determines that a termination is in the City's interest.

The Contractor shall terminate all or any part of The Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the

Page 350 of 735 ends

GENERAL CONDITIONS
69 convenience of the City, the extent of termination, and the effective date of such termination.

After receipt of Notice of Termination, and except as directed by the City, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this Termination for Convenience clause, immediately proceed with the following obligations:
1) Stop Work as specified in the Notice.
2) Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents.
3) Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Documents is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety.
4) Terminate all subcontracts to the extent that they relate to the portions of The Work terminated.
5) Place no further subcontracts or orders, except as necessary to complete the remaining portion of The Work.
6) Submit to the City, within ten (10) Days from the effective date of the Notice of Termination, all of the documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the Effective Date of the Notice of Termination. Any documentation substantiating costs incurred by the Contractor solely as a result of the City's exercise of its right to terminate this Contract pursuant to this clause, which costs the Contractor is authorized under the Contract Documents to incur, shall: (i) be submitted to and received by the City no later than thirty (30) Days after the Effective Date of the Notice of Termination; (ii) describe the costs incurred with particularity; and (iii) be conspicuously identified as "Termination Costs Occasioned by the City's Termination for Convenience."
7) These provisions are in addition to and not in limitation of any other rights or remedies available to the City.
c. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the City may immediately order Contractor to cease Work on the Project until such safety or liability issues are addressed to the satisfaction of the City or the Contract is terminated.

Page 351 of 735 ends

GENERAL CONDITIONS
70 ARTICLE 53. WARRANTY AND GUARANTEE
a. Contractor warrants that all materials and equipment furnished under this Contract shall be new unless otherwise specified in the Contract Documents; and that all Work conforms to the Contract Document requirements and is free of any defect whether performed by the Contractor or any subcontractor or supplier. b. Unless otherwise stated, all warranty periods shall begin upon the filing of the Notice of Completion. Unless otherwise stated, the warranty period shall be for one year. c. The Contractor shall remedy at its expense any damage to City-owned or controlled real or personal property.
d. Contractor shall furnish the City with all warranty and guarantee documents prior to final Acceptance of the Project by the City.
e. The City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days after being notified commence and perform with due diligence all necessary Work. If the Contractor fails to promptly remedy any defect, or damage; the county shall have the right to replace, repair, or otherwise remedy the defect, or damage at the Contractor’s expense.
f. In the event of any emergency constituting an immediate hazard to health, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, the City may undertake at Contractor’s expense, and without prior notice, all Work necessary to correct such condition. g. With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for Work performed and Materials furnished under this Contract, the Contractor shall:
1) Obtain for City all warranties that would be given in normal commercial practice; 2) Require all warranties to be executed, in writing, for the benefit of the City; and 3) Enforce all warranties for the benefit of the City, unless otherwise directed in writing by the City.

This Article shall not limit the City’s rights under this Contract or with respect to latent defects, gross mistakes, or fraud. The City specifically reserves all rights related to defective work, including but not limited to the defect claims pursuant to California Code of Civil Procedure Section 337.15.

Page 352 of 735 ends

GENERAL CONDITIONS
71 ARTICLE 54. DOCUMENT RETENTION & EXAMINATION
a. In accordance with Government Code Section 8546.7, records of both the City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment.
b. Contractor shall make available to the City any of the Contractor’s other documents related to the Project immediately upon request of the City. c. In addition to the State Auditor rights above, the City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the City, for a period of four (4) years after final payment.

ARTICLE 55. SOILS INVESTIGATIONS
When a soils investigation report for the Project site is available, such report shall not be a part of the Contract Documents. Any information obtained from such report as to subsurface soil condition, or to elevations of existing grades or elevations of underlying rock, is approximate only and is not guaranteed. Contractor acknowledges that any soils investigation report (including any borings) was prepared for purposes of design only and Contractor is required to examine the site before submitting its bid and must make whatever tests it deems appropriate to determine the underground condition of the soil.

ARTICLE 56. SEPARATE CONTRACTS
a. The City reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs.
b. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the work in place or discrepancies with the Contract Documents. c. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the City in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be interpreted as granting to Contractor exclusive occupancy at site of the Project. Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer shall decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The City shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting

Page 353 of 735 ends

GENERAL CONDITIONS
72 directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project site.

ARTICLE 57. NOTICE AND SERVICE THEREOF
All notices shall be in writing and either served by personal delivery or mailed to the other party as designated in the Bid Forms. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to City shall be addressed to the City as designated in the Notice Inviting Bids unless City designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) Days after being sent by first class mail, whichever is earlier.

Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party.

ARTICLE 58. NOTICE OF THIRD PARTY CLAIMS
Pursuant to Public Contract Code Section 9201, the City shall provide Contractor with timely notification of the receipt of any third-party claim relating to the Contract.

ARTICLE 59. STATE LICENSE BOARD NOTICE.

Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

ARTICLE 60. INTEGRATION
a. Oral Modifications Ineffective. No oral order, objection, direction, claim or notice by any party or person shall affect or modify any of the terms or obligations contained in the Contract Documents.
b. Contract Documents Represent Entire Contract. The Contract Documents represent the entire agreement of the City and Contractor.

ARTICLE 61. ASSIGNMENT
Contractor shall not assign, transfer, convey, sublet, or otherwise dispose of this Contract or any part thereof including any claims, without prior written consent of the City. Any assignment without the written consent of the City shall be void. Any assignment of money due or to become due under this Contract shall be subject to a prior lien for services rendered or Material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such Materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.

Page 354 of 735 ends

GENERAL CONDITIONS
73 ARTICLE 62. CHANGE IN NAME AND NATURE OF CONTRACTOR’S LEGAL ENTITY
Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected on the Contract.

ARTICLE 63. ASSIGNMENT OF ANTITRUST ACTIONS
Pursuant to Section 7103.5 of the Public Contract Code, in entering into a public works contract or subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (chapter 2 (commencing with Section 16700) of part 2 of division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this Contract or any subcontract. This assignment shall be made and become effective at the time the City makes final payment to the Contractor, without further acknowledgment by the parties.

ARTICLE 64. PROHIBITED INTERESTS
No City official or representative who is authorized in such capacity and on behalf of the City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.

ARTICLE 65. LAWS AND REGULATIONS
a. Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified by their terms. References to specific laws, rules or regulations in this Contract are for reference purposes only, and shall not limit or affect the applicability of provisions not specifically mentioned. If Contractor observes that drawings and specifications are at variance therewith, he shall promptly notify the Engineer in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in work. If Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Engineer, he shall bear all costs arising therefrom.
b. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA laws, rules and regulations. Contractor shall comply with the Historic Building Code, including, but not limited to, as it relates to the ADA, whenever applicable. c. Contractor acknowledges and understands that, pursuant to Public Contract Code Section 20676, sellers of "mined material" must be on an approved list of sellers published

Page 355 of 735 ends

GENERAL CONDITIONS
74 pursuant to Public Resources Code Section 2717(b) in order to supply mined material for this Contract.

ARTICLE 66. PATENT FEES OR ROYALTIES.

The Contractor shall include in its bid amount the patent fees or royalties on any patented article or process furnished or used in the Work. Contractor shall assume all liability and responsibility arising from the use of any patented, or allegedly patented, materials, equipment, devices or processes used in or incorporated with The Work, and shall defend, indemnify and hold harmless the City, its officials, officers, agents, employees and representatives from and against any and all liabilities, demands, claims, damages, losses, costs and expenses, of whatsoever kind or nature, arising from such use.

ARTICLE 67. OWNERSHIP OF DRAWING
All Contract Documents furnished by the City are City property. They are not to be used by Contractor or any subcontractor on other work nor shall Contractor claim any right to such documents. With exception of one complete set of Contract Documents, all documents shall be returned to the City on request at completion of The Work.

ARTICLE 68. NOTICE OF TAXABLE POSSESSORY INTEREST
In accordance with Revenue and Taxation Code Section 107.6, the Contract Documents may create a possessory interest subject to personal property taxation for which Contractor will be responsible.

Page 356 of 735 ends

77 SPECIAL PROVISIONS

Page 357 of 735 ends

78 San Bernardino Avenue Street Improvement Project
The unit prices to be paid for the items listed in the Bid shall include full compensation for furnishing all labor, materials, tools and equipment and doing all work involved in furnishing and installing the materials complete and in place, and in furnishing to the CITY a complete and functional system in accordance with the Specifications, the Plans, these Special Provisions and the direction of the Engineer.

The scope of Work for each item of work in the Bid shall be as described in the Specifications and in the corresponding items of these Special Provisions. Payment for each bid item shall be as specified in the Bid Schedule unless modified by these Special Provisions.

SECTION 1: MOBILIZATION

GENERAL
Mobilization shall conform to the provisions in Section 9-3.4, “Mobilization”, of the Standard Specifications for Public Works Construction.

Mobilization shall consist of preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, materials, tools, equipment and incidentals to the project site, and for the establishment of all offices, buildings and other facilities necessary for work on the project. Mobilization shall be exclusive of work and/or operations the cost of which are included in any of the Bid Items listed on the Bid Schedule and for which a specific price has been bid. The Mobilization bid item shall include any required items of work not specifically included under the other bid items shown on the bid schedule.

MEASUREMENT AND PAYMENT
Mobilization shall be measured as a lump sum.

The contract lump sum price paid for Mobilization includes full compensation for furnishing all labor, materials, tools, equipment, insurance, bonds, and incidentals and for doing all work involved in mobilization to the site, including demobilization and removal of all temporary facilities, equipment and materials, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 2: TEMPORARY TRAFFIC CONTROL

GENERAL
The Contractor shall be responsible for maintaining traffic control necessary for the construction of the project, in accordance with the provisions of Subsection 7-10 of the Standard Specifications, the current requirements set forth in the “Manual on Uniform Traffic Control Devices” published by the Federal Highway Administration, 2022 and the California Supplements 2023, published by the Department of Transportation, State of California, and the requirements of the Traffic Control Plan, Standard Specifications, and these Special Provisions.

Page 358 of 735 ends

79 The Contractor’s shall keep at least one (1) lane of traffic in opposite directions open between the hours of 9:00 a.m. to 3:00 p.m. No traffic lanes or road closures will be allowed during any other times.

The Contractor shall submit a traffic control plan and obtain approval by the City Traffic Engineer and an encroachment permit from the City prior to construction. All construction work and traffic control shall be scheduled and constructed to provide for a minimum inconvenience and maximum safety to the public vehicular and pedestrian traffic along and upstream of the project work area.

The Contractor’s equipment and personal vehicles of the Contractor’s employees shall not be parked on the traveled way or shoulders at any time, except as provided in the approved Traffic Control Plan.

The Contractor shall submit a detailed traffic control plan detailing the delineation, temporary signing and striping and protective measures to be undertaken, for CITY, and if required, other agencies’ approval.

Attention is directed to Section 7-10, "Public Convenience and Safety" of the Standard Specifications. The Contractor shall maintain at least one lane of traffic during working hours.

An exhibit showing Advance Warning, Lane Closure, Signing, Detours, and delineation shall be submitted by the Contractor, in accordance with the Work Area Traffic Control Handbook (W.A.T.C.H.), to the City Traffic Engineer for approval.

The Contractor shall maintain all temporary signing and devices to the satisfaction of the City Traffic Engineer. The Contractor shall, at his/her expense, furnish, install, temporary reflective centerline and laneline tapes and painted barricades or provide flagmen in sufficient number to the satisfaction of the City Traffic Engineer for adequate traffic control in and on the streets that lead to the construction area. No paper signs other than temporary "No Parking" signs are allowed. Conflicting traffic signs and posts shall be removed, covered or relocated as directed by the City Traffic Engineer.

CONSTRUCTION SIGNING
Traffic detour construction signs, delineators, and barricades shall comply with the “Manual on Uniform Traffic Control Devices” published by the Federal Highway Administration, 2022 and the California Supplements 2023, published by the Department of Transportation, State of California. Traffic control signs shall be installed prior to starting any work, maintained throughout the duration of the work, kept free of graffiti at all times during construction, and shall not be removed until all work has been completed. Traffic control signs shall be covered when not in use.

The Contractor shall notify the Engineer of its intention to begin work at least five (5) working days before starting any work. The Contractor shall cooperate with the Engineer in handling traffic through the work area and shall make its own arrangements relative to keeping the area clear of parked vehicles.

TEMPORARY STRIPING

Page 359 of 735 ends

80 Temporary striping and pavement markings for traffic control shall conform to 601-4 of the Standard Specifications and the Manual on Uniform Traffic Control Devices. Temporary striping and markings, which have no further use, shall be removed by wet sandblasting, and all sand used in sandblasting shall be removed without delay as the sandblasting operation progresses.

RESTRICTIONS ON CLOSURE OF TRAFFIC LANES
No road or lane closures will be allowed with the exception that the Contractor will be allowed to maintain one traffic lane in opposite directions between the hours of 9:00 a.m. and 3:00 p.m. Traffic lanes shall be safely maintained at all times due to vehicular and heavy truck movements to and from the project site.

Standard Specification:

Temporary Traffic Control shall comply with the “Work Area Traffic Control Handbook” (W.A.T.C.H. Manual), as shown on the Plans, Standard Drawings and these Special Provisions. Traffic Control Plan shall be prepared (in triplicate) by a Registered Civil Engineer, and each set shall be wet-signed and submitted to the City engineer for review prior to the start of any work.

Special Provisions:

Traffic Control Plan shall include any lane, shoulder, parking, bike lane, driveway, alley or sidewalk closures on San Bernardino Avenue or intersecting streets during the duration of the project. Prior to implementation, the Traffic Control Plan shall be reviewed and approved by the City of Colton.

MEASUREMENT AND PAYMENT
Temporary Traffic Control shall be measured as a lump sum.

The contract lump sum price paid for Temporary Traffic Control includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in temporary traffic control, including installation and removal of temporary pavement markings and traffic control devices, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 3: WATER POLLUTION CONTROL AND STORM WATER POLLUTION

PREVENTION PLAN (SWPPP)

GENERAL
Water Pollution Control and Storm Water Pollution Prevention Plan (SWPPP) shall conform to the provisions in Section 7-8.6, “Water Pollution Control”, of the Standard Specifications for Public Works Construction.

MEASUREMENT AND PAYMENT
Water Pollution Control and Storm Water Pollution Prevention Plan (SWPPP) shall be measured as a lump sum.

Page 360 of 735 ends

81 The contract lump sum price paid for Water Pollution Control and Storm Water Pollution Prevention Plan (SWPPP) includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in water pollution control and Storm Water Pollution Prevention Plan implementation, including permit compliance, design calculations, installation, maintenance and removal of pollution control BMPs, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 4: CONSTRUCTION SURVEYING

GENERAL
This item shall consist of all construction surveying and layout required for the construction of the project and shall be performed in accordance with the Standard Specifications, the plans, and these Special Provisions. Surveying shall conform to SSPWC Section 2-9 “Construction Surveying” except as modified or amended below.

The City will provide established horizontal and vertical control survey points on request.

These will be set prior to the commencement of construction. The Contractor shall preserve these points as well as any other surveys established by the Engineer for use by the contractor for the duration of their usefulness. If any survey points established by the Engineer are lost or disturbed and need to be replaced. Such replacement shall be by the Engineer at the expense of the Contractor. The Contractor shall employ engineers or surveyors to perform adequate surveys and staking necessary to construct the Work to the lines and grades shown on the Plans and for the Engineer’s use in checking such work. Copies of the field notes or diagrams used in setting stakes shall be promptly furnished to the Engineer. Contractor shall notify the City for inspection after the striping layout is completed (dribble lines) and construction stakes are set in the field. Contractor shall not proceed before the layout and stakes are approved by the City.

MEASUREMENT AND PAYMENT
Construction Surveying shall be measured as a lump sum.

The contract lump sum price paid for Construction Surveying, as specified in the Bid Schedule, includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in construction surveying, including layout of all demolition and improvements, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 5: CLEARING AND GRUBBING

GENERAL
Clearing and Grubbing shall comply with Section 300 “Earthwork”, of the Standard Specifications for Public Works Construction. Clearing and Grubbing work shall include all site demolition including, but not limited to, removal of existing curb, gutter, sidewalk, cross gutter, curb ramps, driveway approaches, AC pavement and other surface improvements indicated to be removed. The location of the existing concrete curb, gutter, sidewalk, curb ramps, driveway approaches and AC paving to be removed shall be as indicated on Plan; the

Page 361 of 735 ends

82 resultant materials shall be disposed of according to the Caltrans Standard Specifications, Section 7-1.13 – Disposal of Material Outside the Highway Right of Way. Work for this item shall include all necessary saw cutting and shall be performed in accordance with Section 300-

1.3.2 of the Standard Specifications for Public Works Construction.

MEASUREMENT AND PAYMENT
Clearing and Grubbing shall be measured as a lump sum.

The contract lump sum price paid for Clearing and Grubbing includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in clearing and grubbing the site, including disposal of all cleared and grubbed materials at a legal site, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 6: UNCLASSIFIED EXCAVATION

GENERAL
Standard Specification:

Unclassified Excavation shall comply with Section 300 “Earthwork”, of the Standard Specifications for Public Works Construction.

MEASUREMENT AND PAYMENT
Unclassified Excavation shall be measured by the cubic yard.

The contract unit price paid for Unclassified Excavation includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in unclassified excavation, including placement as engineered fill onsite or disposal of excavated materials at a legal site, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 7: CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLEY

INTERSECTIONS, ACCESS RAMPS AND DRIVEWAYS

GENERAL
Standard Specification:

Construction of Portland Cement Concrete (PCC) curbs, walks, gutters, cross gutters, alley intersections, access ramps and driveways shall comply with Section 201-1, "Portland Cement Concrete", Section 300, “Earthwork”, and Section 301-1, "Subgrade Preparation", and Section 303-5, “Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways” of the Standard Specifications for Public Works Construction, as shown on the Plans, Standard Drawings and these Special Provisions.

MEASUREMENT AND PAYMENT
PCC curbs, walks, gutters, cross gutters, alley intersections, access ramps and driveways shall be measured as each or by the linear foot or square foot as indicated in the bid schedule.

Page 362 of 735 ends

83 The contract unit prices paid for PCC curbs, walks, gutters, cross gutters, alley intersections, access ramps and driveways includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in constructing PCC surface improvements, including laying out and constructing fully ADA-compliant improvements, retaining c and detectable warning surfaces, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 8: ASPHALT CONCRETE PAVING

GENERAL
Standard Specification:

Construction of Asphalt Concrete (AC) paving, new pavement restoration or overlay, shall comply with Section 39, “Asphalt Concrete”, of the Caltrans Standard Specifications. Asphalt concrete shall be Type A HMA.

MEASUREMENT AND PAYMENT
Asphalt Concrete Paving shall be measured by the ton.

The contract unit price paid for Asphalt Concrete Paving, of the type and thickness indicated on the plans, includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in constructing AC paving, including crack sealing, tack coat and pavement grinding, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 9: SLURRY SEAL

GENERAL
DELETE section 203-5 and REPLACE with the following:

Slurry seal shall be emulsion-aggregate slurry (EAS) conforming to 203-5.4 of the Greenbook.

Emulsion-aggregate slurry shall be Type II. The amount and type of accelerator or retardant used shall be approved by the Engineer and shall provide for curing sufficiently to support traffic within 2 hours of initial placement.
203-5.1 MIX DESIGN (DELETE the first paragraph and REPLACE with the following) Prior to the time of delivery of each shipment of asphalt emulsion, the Contractor shall submit certified copies of the mix design in accordance with 2-5.3.4 for each combination of emulsified asphalt grade and aggregate gradation to be used in the work. Each mix design shall conform to ASTM D3910. Laboratory reports supporting each mix design shall identify the aggregate source and supplier, emulsified asphalt supplier, type and grade of asphalt emulsion, date and point of proposed delivery, quantity, purchase order number, and results of the specified tests required in ASTM D3910. The test report shall be signed by an authorized representative of the vendor, shall certify that the product delivered conforms to the standard specifications and is compatible with the proposed aggregate. Testing shall be accomplished by an accredited materials testing

Page 363 of 735 ends

84 laboratory approved by the Engineer.

Prior to a change of asphalt emulsion, Contractor shall thoroughly clean all emulsion tanks and mixing units to prevent any chemical reaction between the two emulsions.

Contractor shall schedule and coordinate the delivery of aggregate to the stockpile(s) such that:
(1) deliveries originate at the plant and arrive at the stockpile site within normal work hours on the same calendar day, (2) delivery site and project name are explicitly stated on each delivery ticket, (3) successive deliveries on the same calendar day show the cumulative total for that day, (4) copies of all delivery tickets are delivered to the Engineer before the end of the working day, whereas any delivery tickets not so delivered may be rejected by the Engineer. Any deviation from this process must have the prior approval of the Engineer.

ADD the following section
203-5.6 ASPHALT RUBBER CRACK SEALANT
The crack sealant shall consist of a mixture of paving grade asphalt and vulcanized granulated crumb rubber. The mixture shall contain not less than 25% granulated reclaimed rubber, by weight. Rubber gradation shall conform to the following requirements:

SIEVE SIZE PERCENT PASSING
No. 8 100
No. 10 98-100
No. 30 -
No. 40 0-10
The sealant shall conform to the following requirements:

Cone Penetration, 77 ºF 40 maximum
Softening Point, ºF 175 minimum
Resilience, 77 ºF 30 minimum
The sealant shall be capable of being melted and applied to cracks at temperatures below 400 ºF. When heated, the material shall readily penetrate cracks ¼ inch in width or wider.

Modifiers may be used to facilitate blending.

CONTROL OF MATERIALS: Each lot of sealant shipped to the job site shall be accompanied by a Certificate of Compliance as provided in Section 6-1.07 of the State of California Department of Transportation’s Standard Specifications (2010 edition), and shall be accompanied by storage instructions, heating instructions, and caution instructions.

ACCELERATOR OR RETARDANT: The retardant shall be the type stated in the job mix formula and shall be approved by the Engineer before use. The amount of accelerator to be included in the mixture shall be that amount necessary to ensure the applied crack seal can support vehicular traffic within four (4) hours after the last application.

Page 364 of 735 ends

85 Prior to application of the crack sealant, the cracks to be filled shall be routed and cleaned of all loose material, silt, sand, dust, vegetation, and other objectionable material. The cleaning and routing operations shall result in clean and dry crevices such that an effective bond between the sealant material and adjacent surfaces is achieved.

MEASUREMENT AND PAYMENT
Slurry Seal shall be measured by the square foot, in place.

The contract unit price paid per square foot for slurry seal, of the type indicated, includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in constructing slurry seal, including crack routing and sealing, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 10: AGGREGATE BASE

GENERAL
Standard Specification:

Aggregate Base shall be ¾ inch Class 2 aggregate base according to the provisions of Section 26, “Aggregate Bases”, of the Caltrans Standard Specifications.

MEASUREMENT AND PAYMENT
Aggregate Base shall be measured by the cubic yard, in place.

The contract unit price paid per cubic yard for aggregate base, of the thickness indicated on the plans, includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in constructing aggregate base, including subgrade preparation, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 11: RELOCATE/ADJUST UTILITY BOX

GENERAL
Standard Specification:

Relocations and adjustments to existing utility boxes shall comply with Section 402, "Utilities", of the Greenbook Standard Specifications, as shown on the Plans, Standard Drawings and these Special Provisions.

MEASUREMENT AND PAYMENT
Relocate/Adjust Utility Box shall be measured as each.

The contract unit price paid each for Relocate/Adjust Utility Box includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in relocating and/or adjusting utility boxes, including replacement of the box and

Page 365 of 735 ends

86 cover in kind and extending the conduit and conductors, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 12: TRAFFIC SIGNAGE

GENERAL
Standard Specification:

Installation, relocation and removal of existing signs and posts shall comply with Section 82, “Signs and Markers” of the Caltrans Standard Specifications. All signs shall comply with the Manual on Uniform Traffic Control Devices (MUTCD).

MEASUREMENT AND PAYMENT
Traffic Signage shall not be measured for payment.

The contract lump sum price paid for Traffic Signage, of the size and type indicated on the plans, includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in installing, relocating or removing traffic signs, including sign posts and foundations, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 13: TRAFFIC STRIPING AND PAVEMENT MARKINGS

GENERAL
Standard Specification:

Traffic stripes and pavement markings shall comply with Section 84-2, “Traffic Stripes and Pavement Markings”, of the Caltrans Standard Specifications. All materials shall be thermoplastic unless otherwise indicated.

MEASUREMENT AND PAYMENT
Traffic Striping and Pavement Markings shall not be measured for payment.

The contract lump sum price paid for Traffic Striping and Pavement Markings includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in installing traffic striping and pavement markings, including removal of existing traffic striping and pavement markings, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

SECTION 14: REMOVAL OF TRAFFIC STRIPING AND PAVEMENT MARKINGS

GENERAL
Standard Specification:

Removal of existing traffic striping and pavement markings shall comply with Section 84-9, “Existing Markings”, of the Caltrans Standard Specifications.

Page 366 of 735 ends

87 MEASUREMENT AND PAYMENT
Removal of existing traffic striping and pavement markings shall not be measured for payment.

Full compensation for removal of existing traffic stripes and pavement markings is included in the contract price(s) paid for the various items of work requiring removal of existing traffic striping and pavement markings, and no additional compensation will be allowed therefor.

SECTION 15: TRAFFIC SIGNAL LOOP REPLACEMENT

GENERAL
Standard Specification:

Replacement of existing traffic signal detection loops shall comply with Section 87, “Electrical Systems”, of the Caltrans Standard Specifications.

MEASUREMENT AND PAYMENT
Traffic Signal Loop Replacement shall be measured as each.

The contract unit price paid each for Traffic Signal Loop Replacement includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all work involved in replacing traffic signal loops, including reconnection to the controller, as shown on the plans, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer.

Page 367 of 735 ends

23152.04000\42402756.1
Exhibit C-1
EXHIBIT “C”

SPECIAL CONDITIONS
ARTICLE 1. BONDS
Concurrently with this Contract, the Contractor shall deliver to the City four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the City and included as Exhibit “F” to the Contract. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price.

Page 368 of 735 ends

23152.04000\42402756.1
Exhibit D-1
EXHIBIT “D”

CERTIFICATION
LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700, et seq., of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.

HARDY & HARPER, INC.

By: _________________________
Signature
_________________________
Name (Print)
_________________________
Title (Print)

Page 369 of 735 ends

23152.04000\42402756.1
Exhibit E-1
EXHIBIT “E”

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/PublicWorks/PublicWorks.html for additional information.

No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.1
Name of Contractor:

DIR Registration Number:

DIR Registration Expiration:__________________________
Small Project Exemption: _____ Yes or _____ No
Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges:

1. Contractor shall maintain a current DIR registration for the duration of the project.

2. Contractor shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

3. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Contractor:____________________
Signature:

Name and Title:

Dated:
1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”

Page 370 of 735 ends

23152.04000\42402756.1
Exhibit F-1
EXHIBIT “F”

PAYMENT AND PERFORMANCE BONDS

Page 371 of 735 ends

23152.04000\42402756.1
Exhibit F-2

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Colton (hereinafter referred to as “City”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ______________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:

Page 372 of 735 ends

23152.04000\42402756.1
Exhibit F-3
(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of sections 2819 and 2845 of the California Civil Code.

Remainder of This Page is Intentionally Left Blank

Page 373 of 735 ends

23152.04000\42402756.1
Exhibit F-4
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__).
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal)
Surety
By
Attorney-in-Fact
Signatures of those signing for the Principal and Surety must be notarized and evidence of corporate authority attached. An original Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety)
(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety
and Agent or Representative for
service of process in California)

Page 374 of 735 ends

23152.04000\42402756.1
Exhibit F-5
Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above

Page 375 of 735 ends

23152.04000\42402756.1
Exhibit F-6

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the City of Colton (hereinafter designated as the “City”), by action taken or a resolution passed ___________ , 20____has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
_____________________________________________________ (the “Project”); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated __________________ (“Contract Documents”), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW, THEREFORE, we, the Principal and __________________________, a corporation organized and existing under the laws of the State of _______________ and authorized to transact surety business under the laws of the State of California as Surety, are held and firmly bound unto City in the sum of ______________ Dollars ($___________) lawful money of the United States of America, the sum not being less than One Hundred Percent (100%) of the total amount of the Contract, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or

Page 376 of 735 ends

23152.04000\42402756.1
Exhibit F-7
released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of sections 2819 and 2845 of the California Civil Code.

The Remainder of this Page is Intentionally Left Blank

Page 377 of 735 ends

23152.04000\42402756.1
Exhibit F-8
IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.
(Corporate Seal)
Contractor/ Principal
By
Title
(Corporate Seal) Surety
By
Attorney-in-Fact
Title
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. An original Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THE FOLLOWING INFORMATION IS MANDATORY
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________
(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California)

Page 378 of 735 ends

23152.04000\42402756.1
Exhibit F-9
Notary Acknowledgment
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally
appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT Individual
Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited
General Number of Pages
Attorney-In-Fact
Trustee(s)
Guardian/Conservator Date of Document
Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above

Page 379 of 735 ends

23152.04000\42402756.1
Exhibit G-1
EXHIBIT “G”

FEDERAL REQUIREMENTS

Page 380 of 735 ends

Item: 7.

Staff Report
Meeting Date: August 5, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Chad Blais, PW & Utility Services Director Item Name: Contract Award - PTM General Engineering Services, Inc. - Approve the Award of Contract to PTM General Engineering Services, Inc. for the New Traffic Signal - Meridian Avenue at San Bernardino Avenue and Olive Street Project in the Amount of $404,004.00.

Recommended Action:

Staff recommends that the City Council take the following action:

1. Authorize the award of contract for the New Traffic Signal – Meridian Avenue at San Bernardino Avenue and Olive Street Project to PTM General Engineering Services, Inc. as the lowest responsive and responsible bidder in the amount of $404,004.00 and authorize the City Manager to execute the contract agreement.

Background:

On February 2020, the City Traffic engineer prepared a technical memorandum at the request of the City to review the warrant analysis for a potential traffic signal at the intersection of Meridian Avenue at San Bernardino Avenue and Olive Street. This intersection is currently STOP controlled for all approaches. Meridian Avenue is classified as a Major Collector in the California Road System Map (CRS Map). Through analysis of collected traffic volume counts and staff field observations it was determined that based on the evaluation procedures contained in the latest California Manual on Uniform Traffic Control Devices (CAMUTCD) that the conditions of this intersection satisfy the minimum warrant criteria needed to justify the installation of traffic signals at the intersection and find that installation of a traffic signal would improve overall traffic flow in the area.

Issues/Analysis:

On April 11, 2022, City Council authorized the award of a design services contract to Transportation & Energy Solutions, Inc. for the preparation of plans and specifications for this project. The plan and specifications were completed on May 30, 2024.

Page 381 of 735 ends

In accordance with Colton Municipal Code (CMC) Section 3.08.090, a request for Notice Inviting Formal Bids was published in The Press Enterprise on June 3, 2025, and June 10, 2025.

Bids were opened on July 10, 2025, and staff received the following bids:

Contractor Bid Amount
PTM General Engineering Service $404,004.00
Elecnor Belco Electric $459,970.00
Estate Design and Construction $478,900.00
Select Electric $486,699.00
Ferreira Construction $498,978.00
Alfaro Communications $508,191.87
DBX $510,800.00
California Professional Engineering $523,469.00
Crosstown Electrical $531,987.00
CalProMax Engineering $585,400.00

Staff reviewed and evaluated submitted bids and recommend awarding the contract (Exhibit B) for the New Traffic Signal – Meridian Avenue at San Bernardino Avenue and Olive Street Project to PTM General Engineering Services, Inc.as the lowest responsive and responsible bidder in the amount of $404,004.00.

Fiscal Impacts:

Sufficient appropriations are available for carryover and in the FY2025-26 adopted budget for the project in the following accounts:

Funding Source Account No. Total Funding (5%
Contingency)
Contract Amount
Traffic Impact
Fund
249-2226-6150-3890-0000-
000
$331,004.90 $331,004.90
Measure I 218-2618-6150-3890-0000-
000
$93,995.10 $72,999.10
Total $425,000.00 $404,004.00
Total funding includes a 5% contingency.

Alternatives:

1. Provide alternative direction to staff.

Attachments:

1. Exhibit A - Project Plans

2. Exhibit B - Contract

Page 382 of 735 ends

TRAFFIC SIGNAL PLAN
5/30/2024
6/6/2024
6160

Page 383 of 735 ends

LEGEND:
p EXISTING SIGN AND POST
p NEW SIGN AND POST
.,. INSTALL CALTRANS TYPE IV (LT) PAVEMENT ARROW AS SHOWN W3-1 2
I
I
J
OJ
IT]
IT]
0 IT]
0 0
0 w
:::)
z
w
> I
<( a.. ""
"" ....I �
u <(
<( �
z m (/)
0 (/)
<(
0 0
�
,- 0::
" u
0 � u...
� 0
0::::
w
�
SAN

STREET LIGHTING TO BE REMOVED
(SEE TRAFFIC SIGNAL PLAN)

BERNARDINO AVENUE

JOIN EX STRIPING
LO LO
LO f')
0 N
-------------========- ========= ==- ---=---
EX. R26(CA)
0 N
W3-3, R26(CA)
200' TAPER
250'
90' TO BACK
!35 MPH! OF CROSSWALK
CONSTRUCTION NOTES:

REMOVE EXISTING CONFLICTING STRIPING, LEGEND, OR MARKING BY GRINDING. WHEN APPLICABLE, LENGTH NOTED ON PLAN.

REMOVE AND SALVAGE EXISTING SIGN(S) AND POST (WHEN APPLICABLE).

INSTALL 12" WHITE LIMIT LINE.

INSTALL 4" DOUBLE-YELLOW STRIPE PER CALTRANS STD. PLAN NO. A20A DETAIL 21.

INSTALL 8" SOLID WHITE CHANNELIZING LINE PER CALTRANS STD. PLAN NO. A20A DETAIL 38A.

INSTALL BIKE LOOP DETECTOR SYMBOL PER CALTRANS STD. PLAN NO. A24C.

REFURBISH EXISTING STRIPING, CROSSWALKS, AND PAVEMENT LEGENDS IN KIND WITH THERMOPLASTIC. INSTALL REFLECTORS WHERE MISSING.

INSTALL LADDER CROSSWALK PER CALTRANS STD. PLAN NO. A24F. CROSSWALK LINES SHALL BE 1' WIDE, LONGITUDINAL LINES SHALL BE 2' WIDE, AND THE SPACES BETWEEN EACH LONGITUDINAL LINE SHALL BE 2' WIDE.

REMOVE AND DISPOSE OF EXISTING FADED SIGN.

FURNISH AND INSTALL NEW SIGN.

FURNISH AND INSTALL NEW SIGN AND POST.

RELOCATE EXISTING SIGNS TO NEW POST.

RELOCATE SIGN FROM STREET LIGHT POLE TO NEW TRAFFIC SIGNAL POLE.

INSTALL 6" WHITE BROKEN STRIPING PER CALTRANS STD. PLAN NO, A20A DETAIL 9.

INSTALL PAVEMENT LEGENDS IN KIND WITH THERMOPLASTIC.

R26(CA) 2

STREET LIGHT TO BE REMOVED
(SEE TRAFFIC SIGNAL PLAN)
EX. OMNITRANS

BUS SIGN
20 18'
44'
24' ' 24' 20'
I
I
EX. R28F(CA) MOD
"COMMERCIAL VEHICLE
OVER 2 TON CAPACITY"

SIGNING AND STRIPING GENERAL NOTES

1. TRAFFIC SIGNING AND STRIPING SHALL CONFORM TO THE 2022 CAL TRANS STANDARD PLANS AND SPECIFICATIONS, AND 2014 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES REV 6, UNLESS OTHERWISE INDICATED.

2. ALL CONFLICTING STRIPING, MARKINGS AND LEGENDS SHALL BE REMOVED. ALL STRIPING THAT IS TO BE REMOVED SHALL HAVE THE PAVEMENT MARKERS PRIED OFF PRIOR TO REMOVAL. ALL MARKINGS AND LEGENDS THAT ARE TO BE REMOVED SHALL BE REMOVED IN A SQUARED OFF PATTERN TO REMOVE ANY EVIDENCE OF ITS ORIGINAL CONFIGURATION. EXISTING THERMOPLASTIC STRIPING TO BE REMOVED SHALL BE REMOVED BY GRINDING METHOD APPROVED BY THE CITY. EXISTING PAINTED STRIPING TO BE REMOVED SHALL BE REMOVED BY WATER BLASTING METHOD UNLESS APPROVED OTHERWISE BY THE CITY.

3. ALL NEW TRAFFIC STRIPING AND PAVEMENT MARKINGS INCLUDING CROSSWALKS SHALL BE THERMOPLASTIC MATERIAL, UNLESS OTHERWISE NOTED ON THIS PLAN.

4. STRIPING SHALL BE SPOTTED FOR THE TRAFFIC/TRANSPORTATION ENGINEER OR HIS DESIGNEE'S APPROVAL PRIOR TO FINAL INSTALLATION. A MINIMUM OF FIVE WORKING DAYS MAY BE REQUIRED FOR THE TRAFFIC/TRANSPORTATION ENGINEER OR HIS DESIGNEE TO INVESTIGATE/APPROVE SPOTTED SITE.

5. SEE SHEET 1 FOR MORE GENERAL NOTES.

SERENATA STREET
EX. R2-1(40)
9 10 R28F(CA) MOD "COMMERCIAL VEHICLE OVER 2 TON CAPACITY" 1 STREET LIGHTING TO BE REMOVED
(SEE TRAFFIC SIGNAL PLAN) OLIVE STREET
!30 MPH!
33'
•
'
::
<
,d
11 ll 1
"
.
,, '
,,
,,
,,
,
,,
,
'•'
1 11
1 '
,
,
,,
,
,
,
,
'
'
"
"
"
'"
"
"
"
"
"
"
"
"
"
"
II
"
30'
11 I llr I
R30B(CA) MOD "STREET SWEEPING"
180' TO BACK
""
"" ....I
u...:
<(�
m (/)
(/)
00 ,- 0::
" u
LO u...
;'. 0
R1-1,
2 SNS
I
a..
�
0 �
0)
9 10 R26(CA) MOD
EX. OMNITRANS

BUS SIGN
EX. RED CURB
R26(CA) MOD 10 9
1DH��II ----�
1 l1IIL/lU
'
'
'
I 1:
,
,
,
,
'
'
'
'
,
,
,
,
'
'
'
'
'
" '
e,'t
jl I I o
,.Jj12.5, 1
1 :13 :6
. I , .
' ' '
' ' '
' ' '
' ' '
11 II I
W3-1
EX. R26
48'
48'
10 R26(CA) MOD
0 ix, "'
EX. RED CURB
40 20 --0
1 "=40'
40 80

GRAPHIC SCALE
£..-' �Transportation ctEnergy Solutions, Inc.

Underground Service Alert
Coll: TOLL FREE
1-800
422-4133

CITY OF COLTON

PUBLIC WORKS DEPARTMENT
PREPARED BY: TRANSPORTATION & ENERGY
SOLUTIONS, INC.

SIGNING AND STRIPING PLAN

MERIDIAN AVENUE
SCALE
3400 INLAND EMPIRE BLVD,
STE. 227 ONTARIO, CA 91764
NAME: DAVID E NELSON
EXPIRES: 6/30/25 AT
HORIZ:
1 :40
VERT:

DRAWN BY: TRS/KBG
PHONE: (714) 685-0001 FAX: (714) 453-9602
R.C.E. 18275 �-
�
30-25
ilQtviJf�\

SAN BERNARDINO AVENUE /

OLIVE STREET
DATE: XX
TWO WORKING DAYS BEFORE YOU DIG DATE: ___ _ SHEET 2 OF 3 APPROVED: _______ DATE: ___ _
PLAN NO. 61 60

CITY ENGINEER
NAME: VICTOR ORTIZ, P.E.

R.C.E.: 73848
6/6/2024

Page 384 of 735 ends

PROPOSED PHASE DIAGRAM

GROUP A GROUP B
LEGEND: w
=>
aJc:l VIDEO DETECTION SYSTEM z
......

I l
' I
- <l----1>
T
�
z
0:::
-

L UNUSED
w <l----1> I "' � ADVANCE DETECTION AREA > <( CONDUCTOR SCHEDULE 0 ,: 0 <( BICYCLE LOOP DETECTION � f- if)
if)
SAN
- - -------- - -
z "1
<( 0 N
- - -
w
�

BERNARDINO AVENUE
0 0:::
u
I
, .
11 '
I
I " '
I J IO
ji I
"'
I
"'
I
24'
0 <D
I
� �
("')()
,,)--/ l"
'
4 21
I
I
I
I
20·
_a_
;- STREET LIGHT POLE TO

BE REMOVED BY

COL TON ELECTRIC
----------------,--,,-------- ------- ffi\ : J -- ' ," f> "
/ /) ,�1�:' :�\ _,<�314171
4 @ 5 � re. ----< L,./ .,,,,;:;;;;1\ LO
"1
!l)1 ¢2
N
�
z

UNUSED UNUSED
0:::
¢5 ¢6
¢3 ¢4
UNUSED
!!
¢7 ¢8

OLIVE STREET
!30 MPH!
185' TO
5 CROSSWALK
'""""".�" � 1'21 .u..._ ��
fsl /\
PROVIDE 5' CLEARANCE 0 ,. / /8\
BETW§EN POWER POLE AND r.;-';:

H J 1?5� e -
-++
I
� '4f ;_ �-,�(E',:C.

I
=:....------ - ---_....,.--,,--- - - -------- - - -------- - - --- LO TRAFFIC SIGNAL POLE. '-H l ),c .. ;·. =�=�=-,;e�=�=�=t,o'nn',,, ;\cl 1====-==-=-e � \Y, •I.: _ e -==:--:===-=,�oofhi1. ,::::::oi±:1-=i:=-=-e�-'===--==="=-{ �oh�, ;;=:-=_:=_::::_-,Q'-Jtla ----+ , · ·''h , '-. //., L � • � .:;/ I "e 1 _ ,v, · '- , - " "' e =oh
- "'
= C
C JL1Ll
�l. • • ...--:-- - f " £ I,( '
- k>�
-
-
- ---g- ---- - 1---g- --- - ---g- --- --+---9- --- - 9 r--- -J+..Hr+-H-+_, ' '\. J \ r'-' ,Y..,,
- - - - - - - - - - - - - - - - - - -� > � I 3 I 4 I 7 j l / I >-------j!..;l C\' 1� - �
"
c -- -�� ..-
"'
--
\c -- -- - -
tc -- -- - - \c -- �, ..l
-
ti,.�,.....,----
- _- _-____ - _ -__ - -��--=
:_: __ ----,
,
�-�-�-�
-
�'r<::tc: :=_ -�w�-"=�:�}=��::��\�c:=� -w
��-"
=��
-
2:l��-=
���-��-
_"
_
t
�
c
:=
�
_
w
"� _:-�::::(��:'- � ...... 1
�
o��l'�"'��ij/ � -cl�=:;;:\-,
--t-t:;:t-�-t-t
'i"
--- �--+
o
�,::,"'
1 1-tw--tw-iilv_ff.:F!c:=
"=
.
-
tr
:-=�\�
-
-:-
- ;
----t-
;-_-,.c:_=_=_ =_= _=_=_=- --
--= -=-=- =- ----= -=-= = � = = = = = = = = = = = = = = = = = = = � = = = = = = = "'
I
- - -tc
�
w
tr e
e e
I'
31,, rv w w w --
I '
, ' "
• -+-
-� 1 i \c 1-�E::::�i:+,�C::'-�$-�������,-�����������������������t§:�������� e Jc e "'-' - Ce e ID ,��� " / � gJ \� � 4� � ,(0 J
\
\
I_
ISJ
_ t'b---isi �
,.
,,
""•
,_ Ir Ir ,_
p
,,
\_ ABANDON STREET ;,. L..::'J , "= ,,. '\
+t+llk--'.Pii - -
,,,
- --'---'-------
V �
I "'
OF STREET LIGHT BE REMOVED BY , /\ / �,,bii,iij, 5• -
1 '\ '
6 \
-- -- -
LIGHT CONDUIT EAST N STREET LIGHT POLE TO _//0 �� I I
I
COLTON ELECTRIC /9, B, ,/ I I�, -- I
' - - -:2
:
1 :
o
=·=T=O===---- - .._ __ - - --------
- - ........... _
M
_
O
_
D
-
IF
-
Y
-
SP
_
R
_
IN
-
K
-
LE;
S
-
TO _J
1 ' I 1 � � '/ :'.� ......

CROSSWALK PREVENT SPRAY ON CABINETS / ]J:j :.,// \ �'
",j
u
1 !35 MPH! ABANDON STREET LIGHT

CONDUIT AND PULL BOX
�
7 �
3 �
4 �
y � , f/ :� /� C ��:· d i
:

I JO "
I
I
,, '.:
,. I
STREET LIGHT POLE TO �

BE REMOVED BY

COL TON ELECTRIC
Q)
I
/
1 : I
1 1
I
I
I
I in
< I

EXISTING BLOCK WALL
RUN No.

AWG
POLE PHASE & & & ill ill ill IA ill & A & A
0 - 1 - - - - - - - - - -
0 - 1 - - - - - - 1 - - -
© - 1 - - - - - - - 1 - 1
0 - 1 - - - - - - - 1 1 -
12CSC ©
- 1 1 - - 1 - 1 - - - -
© - 1 1 - - 1 - - - - - -
0 - 1 1 - 1 - - - - - - -
0 - 1 - 1 - - - - - - - -
0 - 1 - - - - - - - 1 - -
0 - 1 1 - - - - - - - - -
TOTAL 12CSC CABLES - 10 4 1 1 2 - 1 1 3 1 1
0 - 1 - - - - - - - - - -
0 - 1 - - - - - - 1 - - -
© - 1 - - - - - - - 1 - 1
0 - 1 - - - - - - - 1 1 -
©
- 1 1 - - 1 - - - - - -
3CSC ©
- 1 1 - - - - - - - 1 1
0 - 1 1 - 1 - - - - - - -
0 - 1 - 1 - - - - - - - -
0 - 1 - - - - - - - 1 - -
0 - 1 1 - - - - - - - - -
TOTAL 3CSC - 10 4 1 1 2 - 1 1 3 1 1
#6 9CN<'J... 5ER\1CE 2 - - - - - - - - - - -
#10 LUMN/>JRES 4 4 2 2 - 2 2 - 2 2 2 -
#12 IISNS - 4 2 2 - 2 2 - 2 2 2 -
12 SMFO COMM CABLE - - - - - - - - - - - -
CCTV CAT 6 ETHERNET - - - - - - - - - - - -

POWER - - - - - - - - - - - -
VIDEO
CABLE 1 1 1 1 1 1 1 1

DETECTION
- - - -
POWER - 1 1 1 - 1 1 - 1 1 1 -
IP CAMERA CAT 6 ETHERNET - - - - - - - - - - - -

POWER - - - - - - - - - - - -
LOOP
DLC

DETECTION
- - - - - - - - - - - -

A - - - - - - - - - - - -
B - 2 2 - - 2 - - - - - -

C - - - - - - - - - - - -
DLC D - 2 2 2 - - - - - - - -

E - - - - - - - - - - - -
F - 2 - - - - - - - - - -

G - - - - - - - - - - - -
H - 3 - - - - - - - 3 - 3
TOTAL DLCs - 9 4 2 - 2 - - - 3 - 3
CONDUIT SIZE 2" 2/3.5" 3.5" 2.5" 2" 3" 2" 2" 2" 3" 2" 2"

POLE SCHEDULE
I 1,
I
I
I
24'
1 I 6'

STANDARD LUMINAIRE
SIGNAL

SIGNAL HEADS AND MOUNTINGS PEDESTRIAN PUSH BUTTON POLE LOCATION

IISNS (LED)
CONSTRUCTION NOTES:
� INSTALL 332 CABINET WITH MODEL 2070 CONTROLLER WITH 2033 SOFTWARE, 764 PHASE SELECTION AND 768 AUX. PANEL AND ALL ANCILLARY EQUIPMENT. [TI FURNISH AND INSTALL TYPE Ill CF ELECTRICAL EQUIPMENT ENCLOSURE PER CALTRANS STANDARD PLAN ES-2F
[TI INSTALL 721 OPTICOM DETECTION. INCLUDE CABLE AND MOUNTING HARDWARE "1 FURNISH AND INSTALL ITERIS VANTAGE VECTOR NEXT DETECTOR MODEL #4010260-01 ON L.:'.J SIGNAL MAST ARM PER CALTRANS STANDARD PLAN ES-7R. DETAIL "B r-;:-J REMOVE EXISTING CURB RAMP, AND CONTRUCT NEW CURB RAMP PER CASE A PER CAL TRANS L..::..J REVISED STANDARD PLAN RSP A88A. INSTALL 8" RETAINING CURB.

Q REMOVE EXISTING CURB RAMP, AND CONTRUCT NEW CURB RAMP PER CASE C PER CALTRANS � REVISED STANDARD PLAN RSP A88A. [TI INSTALL LED TYPE IISNS.
0 REMOVE INTERFERING WALL FOOTING AND 4" CONDUIT.
�-H-1o---1t--->+---J-+---f'-' ---,H � �· '
I 24'
133'
'I
[ I
I
I
I I
I
Q)
I
I I 1, I
I : I I
I
1 1
I I
I
I I
I I
l< 1 I � �I I:
11 'I
11 I 1
11 I 1
11 11
11 11 (
11 '
11 'I I
I
I
I
I
I
I 1
-u
I
I
.
30 I
I
1j 0
1 1I
JI
I
I
I
I
I
I
I
� ii ] C I
I
iu,
:5
�
f2 (f) if)
o 0
"1 0:::

NU
No.

TYPE
0 1-A
0--
0:::
0 u 17-2-100 <( rn
ECR
I ©
1-A
<(
cV
®
19-2-100
©
1-A
,B -B, ©
19-2-100
C, 6 ©
1-A
®
19-2-100
DETAIL
"A" CD PPB POST
(NO SCALE) 0
1-A
£,/ �Transportation ct Energy Solutions,
3400 INLAND EMPIRE BLVD,
STE. 227 ONTARIO, CA 91764
Inc.

PHONE: (714) 685-0001 FAX: (714) 453-9602
Underground Service Alert
Co/1:TOLL FREE
1-800
422
-
4133

TWO WORKING DAYS BEFORE YOU DIG
M.A.

HEIGHT M.A. LED VEHICLE PED PHASE ARROW
1 o·
-
30' 12· 165
1 o·
-
30' 12· 165
1 o·
-
30' 12· 165
1 o·
-
30' 12· 165
- -
1 o·
-
TV-1-T SP-1-T
15' SV-1-T MAS SP-1-T
TV-1-T SP-1-T
25' SV-1-T MAS-4B SP-1-T
TV-1-T SP-1-T
25' SV-1-T MAS SP-1-T
TV-1-T SP-1-T
25' MAS-4B
TV-1-T SP-1-T

CITY OF COLTON

PUBLIC WORKS DEPARTMENT
PREPARED BYc TRANSPORTATION & ENERGY
SOLUTIONS, INC.

NAME, DAVID E NELSON
4 1
1 8
2 ..
2 8
4 EXPIRES, 6/30/25
R.C.E. 18275 �
RE
�-
0 .
6 _:--
:
0-25
ktzoi)/1/)f,��
DATE, ___ _
(BLUE W/ CITY
LOCAllO'J A B C
LOGO)
EAST 1' 2·
NORTH 6' 2· San Bernardino Ave
NORTH
WEST
SOUTH
SOUTH
EAST
WEST
1' 2·
2· 8'
1' 2·
3' 2·
6' 2·
6' 2·
2· 2·
5' 2·
20 10 --0
1 "=20'

TRAFFIC SIGNAL PLAN

MERIDIAN AVENUE
AT
Meridian Ave
Olive St
Meridian Ave
20 ---�
40 GRAPHIC SCALE
SCALE
HORIZ:
1 :20
VERT:

SAN BERNARDINO AVENUE /

OLIVE STREET
DRAWN BY: TRS/KBG
DATE: XX
SHEET 3 OF 3
APPROVED,------- DATEc ___ _
PLAN NO. 61 60

CITY ENGINEER
NAME, VICTOR ORTIZ. P.E.

R.C.E.c 73848
6/6/2024

Page 385 of 735 ends

23152.04000\42402756.1

CITY OF COLTON

SHORT FORM CONSTRUCTION CONTRACT

NEW SIGNAL-MERIDIAN AVENUE AT SAN BERNARDINO AVENUE AND OLIVE STREET

PROJECT

1. PARTIES AND DATE.

This Contract is made and entered into this 5th day of August, 2025 by and between the City of Colton, a municipal corporation organized under the laws of the State of California with its principal place of business at 650 North La Cadena Drive, Colton, California 92324, County of San Bernardino, State of California (“City”) and PTM General Engineering Services, Inc., a Corporation with its principal place of business at 5942 Acorn Street, Riverside, California 92504 (“Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Contract.

2. RECITALS.

2.1 City. City is a public agency organized under the laws of the State of California, with power to contract for services necessary to achieve its purpose

2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain construction services required by the City on the terms and conditions set forth in this Contract. Contractor represents that it is duly licensed and experienced in providing traffic signal related construction services to public clients, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of City. The following license classifications are required for this Project: Class A

2.3 Project. City desires to engage Contractor to render such services for the San Bernardino Avenue Street Improvement Project (“Project”) as set forth in this Contract.

2.4 Project Documents & Certifications. Contractor has obtained, and delivers concurrently herewith, applicable performance bond, payment bond, insurance documents and other certifications as required by the Contract.

3. TERMS

3.1 Incorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:
• Services/Schedule (Exhibit “A”)
• Plans and Specifications (Exhibit “B”)
• Special Conditions (Exhibit “C”)
• Contractor’s Certificate Regarding Workers’ Compensation (Exhibit “D”) • Public Works Contractor Registration Certification (Exhibit “E”) • Payment and Performance Bonds (Exhibit “F”)
• Federal Requirements (Exhibit “G”)
• Addenda
• Change Orders executed by the City

Page 386 of 735 ends

23152.04000\42402756.1
2 • Edition of the Standard Specifications for Public Works Construction (The Greenbook), Excluding Sections 1-9
• Notice Inviting Bids, if any
• Instructions to Bidders, if any
• Contractor’s Bid

3.1.1 Precedence. To the extent there is a conflict between any portions of this Contract, the order of precedence shall be as follows: change orders, special conditions, technical specifications, plans/construction drawings, general contract terms, scope of work, standard plans, advertisements for bid/proposals, bids/proposals or other documents submitted by Contractor.

3.2 Contractor’s Basic Obligation; Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in the Contract (hereinafter sometimes referred to as the “Work”), for a Total Contract Price as specified pursuant to this Contract. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the exhibits attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in Exhibit “B” attached hereto and incorporated herein by this reference. Special Conditions, if any, relating to the Work are described in Exhibit “C” attached hereto and incorporated herein by this reference.

3.2.1 Change in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in advance and in writing by a valid change order executed by the City.

3.2.1.1 Change Orders. Changes to the Contract Time (as defined in Section 3.3) or Total Contract Price shall be in the form of a written Change Order, either signed by both parties or issued unilaterally by the City. No adjustment shall be made to the Contract Time unless the delay impacts the critical path to completion and the delay was not caused in whole or in part by the Contractor. Failure to timely request a Change Order shall constitute a waiver of any right to adjust the Contract Time or the Total Contract Price. All requests for Change Orders shall be accompanied by detailed supporting documentation, including but not limited to payroll records, invoices, schedules, and any other documentation requested by the City for the purpose of determining the additional costs or the impact of any delay. If the change involves Work bid at a unit price, then the Total Contract Price shall be increased at the unit price. If there is no unit price, then the Total Contract Price shall be adjusted to account for costs actually incurred plus an allowed mark-up of fifteen percent (15%), which shall constitute the entire amount of profit, mark-ups, field or home office overhead costs, including personnel, equipment or office space, any materials, or any costs of equipment idle time for such work. Nothing herein shall prevent the Parties from agreeing to a lump sum cost.
(A) Changes Ordered By City. City may at any time issue a written directive ordering additions, deletions, or changes to the Work. Contractor shall proceed with the work in accordance with the directive. To the extent the directive results in extra work or requires additional Contract Time, Contractor shall request a Change Order within seven (7) days of receiving the Work Directive. If any costs are not capable of being determined within

Page 387 of 735 ends

23152.04000\42402756.1
3 seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined. (B) Changes Requested By Contractor. With respect to any matter that may involve or require an adjustment to the Contract Time or the Contract Price, Contractor shall provide written notice of the underlying facts and circumstances that gave rise to the potential change within seven (7) days or prior to the alteration of conditions, whichever is earlier. Failure to give notice shall constitute a waiver of Contractor’s right to a change order. If any costs are not capable of being determined within seven (7) days, then Contractor shall request a Change Order within seven (7) days of when the costs are capable of being determined.

3.2.2 Substitutions/”Or Equal”. Pursuant to Public Contract Code Section 3400(b), the City may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.”
Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the City may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with Contractor.

The City has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted. Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit.

Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution.

Contractor shall bear all of the City’s costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400.

Page 388 of 735 ends

23152.04000\42402756.1
4 3.3 Period of Performance and Liquidated Damages. Contractor shall perform and complete all Work under this Contract within 180 calendar days, beginning the effective date of the Notice to Proceed (“Contract Time”). Contractor shall perform its Work in strict accordance with any completion schedule, construction schedule or project milestones developed by the City.

Such schedules or milestones may be included as part of Exhibits “A” or “B” attached hereto, or may be provided separately in writing to Contractor. Contractor agrees that if such Work is not completed within the aforementioned Contract Time and/or pursuant to any such completion schedule, construction schedule or project milestones developed pursuant to provisions of the Contract, it is understood, acknowledged and agreed that the City will suffer damage. Pursuant to Government Code Section 53069.85, Contractor shall pay to the City as fixed and liquidated damages the sum of Five-Hundred Dollars ($500) per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule, construction schedule or Project milestones established pursuant to the Contract.

3.4 Standard of Performance; Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Contractor shall perform, at its own cost and expense and without reimbursement from the City, any work necessary to correct errors or omissions which are caused by Contractor’s failure to comply with the standard of care provided for herein. Any employee who is determined by the City to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the City, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work.

3.5 Control and Payment of Subordinates; Contractual Relationship. City retains Contractor on an independent contractor basis and Contractor is not an employee of City. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance.

3.6 City’s Basic Obligation. City agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the City shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the belowreferenced compensation in accordance with compensation provisions set forth in the Contract.

3.7 Compensation and Payment.

3.7.1 Amount of Compensation. As consideration for performance of the Work required herein, City agrees to pay Contractor the Total Contract Price of Four-Hundred

Page 389 of 735 ends

23152.04000\42402756.1
5 Four Thousand Four Dollars ($404,004.00) (“Total Contract Price”) provided that such amount shall be subject to adjustment pursuant to the applicable terms of this Contract or written change orders approved and signed in advance by the City.

3.7.2 Payment of Compensation. If the Work is scheduled for completion in thirty (30) or less calendar days, City will arrange for payment of the Total Contract Price upon completion and approval by City of the Work. If the Work is scheduled for completion in more than thirty (30) calendar days, City will pay Contractor on a monthly basis as provided for herein.

On or before the fifth (5th) day of each month, Contractor shall submit to the City an itemized application for payment in the format supplied by the City indicating the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Contract and such other documentation as the City may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. Contractor may be required to furnish a detailed schedule of values upon request of the City and in such detail and form as the City shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments.

3.7.3 Prompt Payment. City shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others.

3.7.4 Contract Retentions. From each approved progress estimate, five percent (5%) will be deducted and retained by the City, and the remainder will be paid to Contractor. All Contract retention shall be released and paid to Contractor and subcontractors pursuant to California Public Contract Code Section 7107.

3.7.5 Other Retentions. In addition to Contract retentions, the City may deduct from each progress payment an amount necessary to protect City from loss because of:
(1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the City in performing any of Contractor’s obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by City during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the City, incurred by the City for which Contractor is liable under the Contract; and (11) any other sums which the City is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the City to deduct any of these sums from a progress payment shall not constitute a waiver of the City’s right to such sums.

3.7.6 Substitutions for Contract Retentions. In accordance with California Public Contract Code Section 22300, the City will permit the substitution of securities for any monies withheld by the City to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the City, or with a state or federally chartered bank in California as the escrow agent, and thereafter

Page 390 of 735 ends

23152.04000\42402756.1
6 the City shall then pay such monies to Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the City has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon.

The escrow agreement used for the purposes of this Section shall be in the form provided by the City.

3.7.7 Payment to Subcontractors. Contractor shall pay all subcontractors for and on account of work performed by such subcontractors in accordance with the terms of their respective subcontracts and as provided for in Section 7108.5 of the California Business and Professions Code. Such payments to subcontractors shall be based on the measurements and estimates made and progress payments provided to Contractor pursuant to this Contract.

3.7.8 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the City at the time of payment. To the extent that title has not previously been vested in the City by reason of payments, full title shall pass to the City at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the City, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items.

3.7.9 Labor and Material Releases. Contractor shall furnish City with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by City.

3.8 Labor

3.8.1 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Since the Work is being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request, and shall post copies at Contractor’s principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

3.8.2 Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the

Page 391 of 735 ends

23152.04000\42402756.1
7 California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

3.8.3 Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day’s work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.

3.8.4 Payroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty to City, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on Contractor.

In accordance with Labor Code section 1771.4, the Contractor and each subcontractor shall furnish the certified payroll records directly to the DIR on a weekly basis and in the format prescribed by the DIR, which may include electronic submission. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.8.5 Contractor and Subcontractor Registration. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit “E” prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

Page 392 of 735 ends

23152.04000\42402756.1
8 3.8.6 Labor Compliance; Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the City.

Contractor shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.9 Performance of Work; Jobsite Obligations.

3.9.1 Water Quality Management and Compliance.

3.9.1.1 Water Quality Management and Compliance. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter-Cologne Water Quality Control Act, to any ground or surface water in the State.

3.9.1.2 Compliance with the Statewide Construction General Permit.

Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board (“Permit”). It shall be Contractor’s sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity which results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires the SWPPP to be a “living document” that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor’s sole responsibility to update the SWPPP as necessary to address conditions at the project site.

Without in any way diminishing Contractor's sole responsibility for obtaining coverage under, and complying with, the Permit, the City will use reasonable efforts to assist Contractor in filing the Notice of Intent when the City's participation is required by the Permit.

3.9.1.3 Other Water Quality Rules, Regulations, and Policies.

Contractor shall comply with the lawful requirements of the Environmental Protection Agency, the State Water Resources Control Board, the Santa Ana Regional Water Quality Control Board, and the City, as well as any other applicable municipality, drainage district, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

Page 393 of 735 ends

23152.04000\42402756.1
9 3.9.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during construction of the Work. Therefore, the Contractor, hereby acknowledges that it has investigated the risk arising from such waters and assumes any and all risks and liabilities arising therefrom.

3.9.1.5 Liability for Non-Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the City and its directors, officials, officers, employees, volunteers and agents for any alleged violations of this Section

3.9.1.5, including the Permit or any of the laws, rules, regulations and policies provided for herein..

In addition, City may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor’s failure to comply with the Permit.

3.9.1.6 Reservation of Right to Defend. City reserves the right to defend any enforcement action brought against the City for Contractor’s failure to comply with the Permit or any other relevant water quality law, regulation, or policy. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the City for the costs (including the City’s attorney’s fees) associated with, any settlement reached between the City and the relevant enforcement entity.

3.9.1.7 Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.9.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by City, regarding the requirements of the laws, regulations and policies described in paragraph 3.9.1 as they may relate to the Work provided under this Contract.

Upon request, City will provide the Contractor with a list of training programs that meet the requirements of this paragraph.

3.9.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site.

3.9.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give

Page 394 of 735 ends

23152.04000\42402756.1
10 all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with the Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the City in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Contractor shall be solely responsible for all costs arising therefrom. City is a public entity of the State of California subject to certain provisions of the Health & Safety Code, Government Code, Public Contract Code, and Labor Code of the State. It is stipulated and agreed that all provisions of the law applicable to the public contracts of a municipality are a part of this Contract to the same extent as though set forth herein and will be complied with. Contractor shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.9.4 Permits and Licenses. Contractor shall be responsible for securing City permits and licenses necessary to perform the Work described herein, including, but not limited to, a City Business License. While Contractor will not be charged a fee for any City permits, Contractor shall pay the City’s applicable business license fee. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

3.9.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for City’s review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

3.9.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify City of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by City; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, City shall promptly investigate the conditions to determine whether a change order is appropriate.

In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute.

3.9.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, City shall compensate Contractor for the costs of: (1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the construction drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of City to provide for removal or relocation of such utility facilities.

Page 395 of 735 ends

23152.04000\42402756.1
11 3.9.8 Air Quality.

3.9.8.1 Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. Contractor shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Contract.

3.9.8.2 Contractor shall comply, and ensure all subcontractors comply, with all applicable requirements of Title 13, California Code of Regulations Division 3, Chapter 9 (“Regulation”).

3.9.8.3 Throughout the Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and any subcontractors’ fleet including, without limitation, all Certificates of Reported Compliance, fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City.

3.9.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling.

3.9.10 Inspection Of Site. Contractor has visited sites where Work is to be performed and has become acquainted with all conditions affecting the Work. Contractor warrants that it has made such examinations as it deems necessary to determine the condition of the Work sites, its accessibility to materials, workmen and equipment, and to determine the Contractor’s ability to protect existing surface and subsurface improvements. No claim for allowances–time or money–will be allowed as to such matters.

3.9.11 Field Measurements. Contractor shall make field measurements, verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing activities.

Errors, inconsistencies or omissions discovered shall be reported to the City immediately and prior to performing any work or altering the condition.

3.10 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify City in writing and shall furnish all labor and material releases required by this Contract. City shall thereupon inspect the Work. If the Work is not acceptable to the City, the City shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a re-inspection by the City. Once the Work is acceptable to City, City shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which City may be authorized or directed by law to retain.

Page 396 of 735 ends

23152.04000\42402756.1
12 Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code.

3.11 Claims; Government Code Claim Compliance.

3.11.1 Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims.

The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes.

3.11.2 The following requirements apply to all contracts entered into after January 1, 1991, and all claims to which this section applies:

3.11.2.1 Prerequisites. If any dispute shall arise between the City and Contractor regarding performance of the work, or any alleged change in the work, Contractor shall timely perform the disputed work and shall give written notice of a claim for additional compensation for the work to the City within three (3) days after commencement of the disputed work. Contractor’s failure to give written notice within the three (3)-day period constitutes an agreement by Contractor that it will receive no extra compensation for the disputed work and shall constitute a waiver of the right to these procedures.

3.11.2.2 Claim Submittal. For purposes of this section, “Claim” means a separate demand by the Contractor, after a change order duly requested in accordance with the terms of this Contract has been denied by the City, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the City. Claims governed by this section may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order procedures contained herein, and Contractor’s request for a change has been denied in whole or in part. The claim shall be submitted in writing to the City and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Claims governed by this procedure must be filed on or before the date of final payment. Nothing in this section is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

3.11.2.3 Supporting Documentation: The Contractor shall submit all claims in the following format:
(1) Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made
(2) List of documents relating to claim:
(A) Specifications

Page 397 of 735 ends

23152.04000\42402756.1
13 (B) Drawings
(C) Clarifications (Requests for Information)
(D) Schedules
(E) Other
(3) Chronology of events and correspondence
(4) Analysis of claim merit
(5) Analysis of claim cost
(6) Time impact analysis in CPM format

3.11.2.4 City’s Response. Upon receipt of a claim pursuant to this section, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the public entity issues its written statement. (1) If the City needs approval from the City Council to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City Council does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three days following the next duly publicly noticed meeting of the City Council after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
(2) Within 30 days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the City may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor.
(3) The City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $50,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

3.11.2.5 Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 days of receipt of the City’s response or within 15 days of the City’s failure to respond within the time prescribed, respectively, and demand an informal conference to

Page 398 of 735 ends

23152.04000\42402756.1
14 meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute.

3.11.2.6 Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement.

Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.
(1) If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. (2) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(3) Unless otherwise agreed to by the City and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(4) The mediation shall be held no earlier than the date the Contractor completes the Work or the date that the Contractor last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.
(5) If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference or mediation.

3.11.2.7 Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this section:

Page 399 of 735 ends

23152.04000\42402756.1
15 (1) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to nonbinding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures.. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.
(2) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.
(A) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

3.11.2.8 Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Section 900, et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the Project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.

3.11.2.9 City’s Responses. The City’s failure to respond to a claim from the Contractor within the time periods described in this section or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. City’s failure to respond shall not waive City’s rights to any subsequent procedures for the resolution of disputed claims.

3.12 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to

Page 400 of 735 ends

23152.04000\42402756.1
16 herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by City. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the City may terminate this Contract pursuant to Section 3.18.3; provided, however, that the City needs to provide Contractor with only one (1) day advanced written notice.

3.13 Indemnification.

3.13.1 Scope of Indemnity. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the City, its officials, employees, agents and volunteers free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, (collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor’s services, the Project or this Contract, including without limitation the payment of all expert witness fees, attorneys’ fees, and other related costs and expenses.

Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City’s agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons.

3.13.2 Additional Indemnity Obligations. Contractor shall defend, with counsel of City’s choosing and at Contractor’s own cost, expense and risk, any and all Claims covered by this section that may be brought or instituted against City or its officials, employees, agents and volunteers. In addition, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City or its officials, employees, agents and volunteers as part of any such claim, suit, action or other proceeding. Contractor shall also reimburse City for the cost of any settlement paid by City or its officials, employees, agents and volunteers as part of any such claim, suit, action or other proceeding. Such reimbursement shall include payment for City’s attorney’s fees and costs, including expert witness fees. Contractor shall reimburse City and its officials, employees, agents and volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Contractor’s obligation to indemnify shall survive expiration or termination of this Contract, and shall not be restricted to insurance proceeds, if any, received by the City, its officials, employees, agents and volunteers.

3.14 Insurance.

3.14.1 Time for Compliance. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause.

3.14.2 Minimum Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or

Page 401 of 735 ends

23152.04000\42402756.1
17 damages to property which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage:

3.14.2.1 Minimum Scope of Insurance. Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01) OR Insurance Services Office Owners and Contractors Protective Liability Coverage Form (CG 00 09 11 88) (coverage for operations of designated contractor); (2) Automobile Liability: Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto); (3) Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance; and (4) Builders’/All Risk: Builders’/All Risk insurance covering for all risks of loss, including explosion, collapse, underground excavation and removal of lateral support (and including earthquakes and floods if requested by the City). Policies shall not contain exclusions contrary to this Contract, including but not limited to endorsements or provisions limiting coverage for (1) contractual liability (including but not limited to ISO CG 24 26 or 21 29); or (2) cross liability for claims or suits by one insured against another.

3.14.2.2 Minimum Limits of Insurance. Contractor shall maintain limits no less than: (1) General Liability: $1,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used including, but not limited to, form CG 2503, either the general aggregate limit shall apply separately to this Contract/location or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability: $1,000,000 per accident for bodily injury and property damage; (3) Workers’ Compensation and Employer’s Liability: Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease; and (4) Builders’/All Risk: Completed value of the project. Defense costs shall be available in addition to the limits. Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the parties required to be named as additional insureds pursuant to this Contract.

3.14.2.3 Notices; Cancellation or Reduction of Coverage. At least fifteen (15) days prior to the expiration of any such policy, evidence showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or materially reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies. In the event any policy of insurance required under this Contract does not comply with these specifications or is canceled and not replaced, the City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by the City will be promptly reimbursed by Contractor or the City may withhold amounts sufficient to pay premium from Contractor payments. In the alternative, the City may suspend or terminate this Contract.

3.14.3 Insurance Endorsements. The insurance policies shall contain the following provisions, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the City to add the following provisions to the insurance policies:

Page 402 of 735 ends

23152.04000\42402756.1
18 3.14.3.1 General Liability. The general liability policy shall include or be endorsed (amended) to state that: (1) using ISO CG forms 20 10 and 20 37, or endorsements providing the exact same coverage, the City of Colton, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to the Services or ongoing and completed operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; and (2) using ISO form 20 01, or endorsements providing the exact same coverage, the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any excess insurance shall contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of the City, before the City’s own primary insurance or self-insurance shall be called upon to protect it as a named insured. Any insurance or self-insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way. Notwithstanding the minimum limits set forth in Section 3.14.2.2, any available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as additional insureds pursuant to this Section

3.14.3.1. 3.14.3.2 Automobile Liability. (1) The City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way. Notwithstanding the minimum limits set forth in Section 3.14.2.2, any available insurance proceeds in excess of the specified minimum limits of coverage shall be available to the parties required to be named as additional insureds pursuant to this Section 3.14.3.2.

3.14.3.3 Workers’ Compensation and Employer’s Liability Coverage.

The insurer shall agree to waive all rights of subrogation against the City, its directors, officials, officers, employees, agents and volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor.

3.14.3.4 All Coverages. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days (10 days for nonpayment of premium) prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, officers, employees, agents and volunteers.

Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officials, officers, employees, agents and volunteers, or any other additional insureds.

3.14.4 Builders’/All Risk Policy Requirements. The builders’/all risk insurance shall provide that the City be named as loss payee. In addition, the insurer shall waive all rights of subrogation against the City.

Page 403 of 735 ends

23152.04000\42402756.1
19 3.14.5 Separation of Insureds; No Special Limitations; Waiver of Subrogation.

All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the City, its directors, officials, officers, employees, agents and volunteers. All policies shall waive any right of subrogation of the insurer against the City, its officials, officers, employees, agents, and volunteers, or any other additional insureds, or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, its officials, officers, employees, agents, and volunteers, or any other additional insureds, and shall require similar written express waivers and insurance clauses from each of its subcontractors.

3.14.6 Professional Liability Insurance. All architects, engineers, consultants or design professionals retained by Contractor shall also procure and maintain, for a period of five (5) years following completion of the Contract, errors and omissions liability insurance with a limit of not less than $1,000,000 per occurrence. This insurance shall name the City, its directors, officials, officers, employees, agents and volunteers as additional and insureds with respect to Work performed, and shall otherwise comply with all requirements of this Section. Defense costs shall be paid in addition to the limits.

3.14.7 Deductibles and Self-Insurance Retentions. Any deductibles or selfinsured retentions must be declared to and approved by the City. Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or selfinsured retentions as respects the City, its directors, officials, officers, employees, agents and volunteers; or (2) the Contractor shall procure a bond guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

3.14.8 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A:VIII, licensed to do business in California, and satisfactory to the City.

3.14.9 Verification of Coverage. Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the City. All certificates and endorsements must be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

3.14.10 Subcontractors. Contractor shall not allow any subcontractors to commence work on any subcontract relating to the work under the Contract until they have provided evidence satisfactory to the City that they have secured all insurance required under this Section. If requested by Contractor, the City may approve different scopes or minimum limits of insurance for particular subcontractors. The Contractor and the City shall be named as additional insureds on all subcontractors’ policies of Commercial General Liability using ISO form 20 38, or coverage at least as broad. In addition, Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor.

All coverages for subcontractors shall be subject to all of the requirements stated herein.

3.14.11 Reporting of Claims. Contractor shall report to the City, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the Work under this Contract.

Page 404 of 735 ends

23152.04000\42402756.1
20 3.15 Bond Requirements.

3.15.1 Payment Bond. If required by law or otherwise specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Payment Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.15.2 Performance Bond. If specifically requested by City in Exhibit “C” attached hereto and incorporated herein by reference, Contractor shall execute and provide to City concurrently with this Contract a Performance Bond in an amount required by the City and in a form provided or approved by the City. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the City.

3.15.3 Bond Provisions. Should, in City’s sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from City. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the City, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the City. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request of the City, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the City. If Contractor fails to furnish any required bond, the City may terminate the Contract for cause.

3.15.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the City.

3.16 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the Work or non-conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor’s obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work.

Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal,

Page 405 of 735 ends

23152.04000\42402756.1
21 replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor’s sole expense.

Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.

3.17 Employee/Labor Certifications.

3.17.1 Contractor’s Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker’s Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contract as Exhibit “D” and incorporated herein by reference, shall be executed simultaneously with this Contract.

3.17.2 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

3.17.3 Verification of Employment Eligibility. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same. The City shall not be responsible for any costs or expenses related to Contractor’s compliance with the requirements provided for in Section 3.17 or any of its sub-sections.

3.18 General Provisions.

3.18.1 City’s Representative. The City hereby designates the Public Works Director or his or her designee, to act as its representative for the performance of this Contract (“City’s Representative”). City’s Representative shall have the power to act on behalf of the City for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the City’s Representative or his or her designee.

3.18.2 Contractor’s Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the City (“′Contractor’s Representative”). Following approval by the City, Contractor’s Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor’s Representative shall

Page 406 of 735 ends

23152.04000\42402756.1
22 supervise and direct the Work, using his best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract. Contractor’s Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the City, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the City, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor’s Representative, Contractor shall provide the information specified above and obtain the City’s written approval.

3.18.3 Termination. This Contract may be terminated by City at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by City for any reason other than the fault of Contractor, City shall pay Contractor for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, City may terminate this Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offset City’s resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, City may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by Contractor in connection with its performance of this Contract.

Contractor shall be required to provide such document and other information within fifteen (15) days of the request. The City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Contractor shall not be entitled to payment for unperformed Work, including, without limitation, any overhead and profit on the portion of the Work that is terminated and shall not be entitled to damages or compensation of any kind or nature for termination of Work.

3.18.4 Contract Interpretation. Should any question arise regarding the meaning or import of any of the provisions of this Contract or written or oral instructions from City, the matter shall be referred to City’s Representative, whose decision shall be binding upon Contractor.

3.18.5 Anti-Trust Claims. This provision shall be operative if this Contract is applicable to California Public Contract Code Section 7103.5. In entering into this Contract to supply goods, services or materials, Contractor hereby offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Contract. This assignment shall be made and become effective at the time the City tender final payment to Contractor, without further acknowledgment by the Parties.

3.18.6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be provided by the mailing thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows:

Page 407 of 735 ends

23152.04000\42402756.1
23 CONTRACTOR:

PTM GENERAL ENGINEERING SERVICES, INC.
5942 ACORN STREET
RIVERSIDE, CA 92504
ATTN: ELIZABETH H. MENDOZA, PRESIDENT
CITY:

CITY OF COLTON
650 NORTH LA CADENA DRIVE
COLTON, CA 92324
ATTN: CHAD BLAIS, PUBLIC WORKS DIRECTOR
Any notice so given shall be considered received by the other Party three (3) days after deposit in the U.S. Mail as stated above and addressed to the Party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

3.18.7 Time of Essence. Time is of the essence in the performance of this Contract.

3.18.8 Assignment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of City. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, City may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee

3.18.9 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.

3.18.10 Laws, Venue. This Contract shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Contract, the action shall be brought in a state or federal court situated in the County of San Bernardino, State of California.

3.18.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original.

3.18.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract.

3.18.13 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to terminate this Contract without liability.

Page 408 of 735 ends

23152.04000\42402756.1
24 3.18.14 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, City shall have the right to rescind this Contract without liability. For the term of this Contract, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the City’s Filing Officer as required under state law in the performance of the Work.

3.18.15 Certification of License.

3.18.15.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor’s license of the classification indicated below under Contractor’s signature.

3.18.15.2 Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O.

Box 26000, Sacramento, California 95826.

3.18.16 Authority to Enter Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party.

3.18.17 Entire Contract; Modification. This Contract contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties.

3.18.18 Non-Waiver. None of the provisions of this Contract shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.18.19 City’s Right to Employ Other Contractors. City reserves right to employ other contractors in connection with this Project or other projects.

3.18.20 Federal Provisions. When funding for the Work is provided, in whole or in part, by an agency of the federal government, Contractor shall also fully and adequately comply with the provisions included in Exhibit “G” (Federal Requirements) attached hereto and incorporated herein by reference (“Federal Requirements”). With respect to any conflict between such Federal Requirements and the terms of this Contract and/or the provisions of state law, the more stringent requirement shall control.
[Signatures on Next Page]

Page 409 of 735 ends

23152.04000\42402756.1
25 SIGNATURE PAGE FOR CONSTRUCTION CONTRACT

BETWEEN THE CITY OF COLTON
AND PTM GENERAL ENGINEERING SERVICES, INC.

IN WITNESS WHEREOF, the Parties have entered into this Contract as of the 5 th day of
August 2025.

CITY OF COLTON HARDY & HARPER, INC.

CORPORATION
By: ____________________________ By: _________________________ Bill Smith Elizabeth H. Mendoza
City Manager President
Attest:
____
Isaac T. Suchil
City Clerk
_______________________________
Contractor’s License Number/Classification
_______________________________
DIR Registration Number
Approved as to Form:
______________________________
Best Best & Krieger LLP
City Attorney

Page 410 of 735 ends

23152.04000\42402756.1
Exhibit A-1
EXHIBIT “A”

SERVICES / SCHEDULE

Page 411 of 735 ends
Page 412 of 735 ends
Page 413 of 735 ends
Page 414 of 735 ends
Page 415 of 735 ends
Page 416 of 735 ends
Page 417 of 735 ends
Page 418 of 735 ends
Page 419 of 735 ends
Page 420 of 735 ends
Page 421 of 735 ends
Page 422 of 735 ends
Page 423 of 735 ends
Page 424 of 735 ends
Page 425 of 735 ends
Page 426 of 735 ends
Page 427 of 735 ends
Page 428 of 735 ends
Page 429 of 735 ends
Page 430 of 735 ends
Page 431 of 735 ends
Page 432 of 735 ends
Page 433 of 735 ends
Page 434 of 735 ends
Page 435 of 735 ends
Page 436 of 735 ends
Page 437 of 735 ends
Page 438 of 735 ends

23152.04000\42402756.1
Exhibit B-1
EXHIBIT “B”

PLANS AND SPECIFICATIONS

Page 439 of 735 ends

TRAFFIC SIGNAL PLAN
5/30/2024
6/6/2024
6160

Page 440 of 735 ends

LEGEND:
p EXISTING SIGN AND POST
p NEW SIGN AND POST
.,. INSTALL CALTRANS TYPE IV (LT) PAVEMENT ARROW AS SHOWN W3-1 2
I
I
J
OJ
IT]
IT]
0 IT]
0 0
0 w
:::)
z
w
> I
<( a.. ""
"" ....I �
u <(
<( �
z m (/)
0 (/)
<(
0 0
�
,- 0::
" u
0 � u...
� 0
0::::
w
�
SAN

STREET LIGHTING TO BE REMOVED
(SEE TRAFFIC SIGNAL PLAN)

BERNARDINO AVENUE

JOIN EX STRIPING
LO LO
LO f')
0 N
-------------========- ========= ==- ---=---
EX. R26(CA)
0 N
W3-3, R26(CA)
200' TAPER
250'
90' TO BACK
!35 MPH! OF CROSSWALK
CONSTRUCTION NOTES:

REMOVE EXISTING CONFLICTING STRIPING, LEGEND, OR MARKING BY GRINDING. WHEN APPLICABLE, LENGTH NOTED ON PLAN.

REMOVE AND SALVAGE EXISTING SIGN(S) AND POST (WHEN APPLICABLE).

INSTALL 12" WHITE LIMIT LINE.

INSTALL 4" DOUBLE-YELLOW STRIPE PER CALTRANS STD. PLAN NO. A20A DETAIL 21.

INSTALL 8" SOLID WHITE CHANNELIZING LINE PER CALTRANS STD. PLAN NO. A20A DETAIL 38A.

INSTALL BIKE LOOP DETECTOR SYMBOL PER CALTRANS STD. PLAN NO. A24C.

REFURBISH EXISTING STRIPING, CROSSWALKS, AND PAVEMENT LEGENDS IN KIND WITH THERMOPLASTIC. INSTALL REFLECTORS WHERE MISSING.

INSTALL LADDER CROSSWALK PER CALTRANS STD. PLAN NO. A24F. CROSSWALK LINES SHALL BE 1' WIDE, LONGITUDINAL LINES SHALL BE 2' WIDE, AND THE SPACES BETWEEN EACH LONGITUDINAL LINE SHALL BE 2' WIDE.

REMOVE AND DISPOSE OF EXISTING FADED SIGN.

FURNISH AND INSTALL NEW SIGN.

FURNISH AND INSTALL NEW SIGN AND POST.

RELOCATE EXISTING SIGNS TO NEW POST.

RELOCATE SIGN FROM STREET LIGHT POLE TO NEW TRAFFIC SIGNAL POLE.

INSTALL 6" WHITE BROKEN STRIPING PER CALTRANS STD. PLAN NO, A20A DETAIL 9.

INSTALL PAVEMENT LEGENDS IN KIND WITH THERMOPLASTIC.

R26(CA) 2

STREET LIGHT TO BE REMOVED
(SEE TRAFFIC SIGNAL PLAN)
EX. OMNITRANS

BUS SIGN
20 18'
44'
24' ' 24' 20'
I
I
EX. R28F(CA) MOD
"COMMERCIAL VEHICLE
OVER 2 TON CAPACITY"

SIGNING AND STRIPING GENERAL NOTES

1. TRAFFIC SIGNING AND STRIPING SHALL CONFORM TO THE 2022 CAL TRANS STANDARD PLANS AND SPECIFICATIONS, AND 2014 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES REV 6, UNLESS OTHERWISE INDICATED.

2. ALL CONFLICTING STRIPING, MARKINGS AND LEGENDS SHALL BE REMOVED. ALL STRIPING THAT IS TO BE REMOVED SHALL HAVE THE PAVEMENT MARKERS PRIED OFF PRIOR TO REMOVAL. ALL MARKINGS AND LEGENDS THAT ARE TO BE REMOVED SHALL BE REMOVED IN A SQUARED OFF PATTERN TO REMOVE ANY EVIDENCE OF ITS ORIGINAL CONFIGURATION. EXISTING THERMOPLASTIC STRIPING TO BE REMOVED SHALL BE REMOVED BY GRINDING METHOD APPROVED BY THE CITY. EXISTING PAINTED STRIPING TO BE REMOVED SHALL BE REMOVED BY WATER BLASTING METHOD UNLESS APPROVED OTHERWISE BY THE CITY.

3. ALL NEW TRAFFIC STRIPING AND PAVEMENT MARKINGS INCLUDING CROSSWALKS SHALL BE THERMOPLASTIC MATERIAL, UNLESS OTHERWISE NOTED ON THIS PLAN.

4. STRIPING SHALL BE SPOTTED FOR THE TRAFFIC/TRANSPORTATION ENGINEER OR HIS DESIGNEE'S APPROVAL PRIOR TO FINAL INSTALLATION. A MINIMUM OF FIVE WORKING DAYS MAY BE REQUIRED FOR THE TRAFFIC/TRANSPORTATION ENGINEER OR HIS DESIGNEE TO INVESTIGATE/APPROVE SPOTTED SITE.

5. SEE SHEET 1 FOR MORE GENERAL NOTES.

SERENATA STREET
EX. R2-1(40)
9 10 R28F(CA) MOD "COMMERCIAL VEHICLE OVER 2 TON CAPACITY" 1 STREET LIGHTING TO BE REMOVED
(SEE TRAFFIC SIGNAL PLAN) OLIVE STREET
!30 MPH!
33'
•
'
::
<
,d
11 ll 1
"
.
,, '
,,
,,
,,
,
,,
,
'•'
1 11
1 '
,
,
,,
,
,
,
,
'
'
"
"
"
'"
"
"
"
"
"
"
"
"
"
"
II
"
30'
11 I llr I
R30B(CA) MOD "STREET SWEEPING"
180' TO BACK
""
"" ....I
u...:
<(�
m (/)
(/)
00 ,- 0::
" u
LO u...
;'. 0
R1-1,
2 SNS
I
a..
�
0 �
0)
9 10 R26(CA) MOD
EX. OMNITRANS

BUS SIGN
EX. RED CURB
R26(CA) MOD 10 9
1DH��II ----�
1 l1IIL/lU
'
'
'
I 1:
,
,
,
,
'
'
'
'
,
,
,
,
'
'
'
'
'
" '
e,'t
jl I I o
,.Jj12.5, 1
1 :13 :6
. I , .
' ' '
' ' '
' ' '
' ' '
11 II I
W3-1
EX. R26
48'
48'
10 R26(CA) MOD
0 ix, "'
EX. RED CURB
40 20 --0
1 "=40'
40 80

GRAPHIC SCALE
£..-' �Transportation ctEnergy Solutions, Inc.

Underground Service Alert
Coll: TOLL FREE
1-800
422-4133

CITY OF COLTON

PUBLIC WORKS DEPARTMENT
PREPARED BY: TRANSPORTATION & ENERGY
SOLUTIONS, INC.

SIGNING AND STRIPING PLAN

MERIDIAN AVENUE
SCALE
3400 INLAND EMPIRE BLVD,
STE. 227 ONTARIO, CA 91764
NAME: DAVID E NELSON
EXPIRES: 6/30/25 AT
HORIZ:
1 :40
VERT:

DRAWN BY: TRS/KBG
PHONE: (714) 685-0001 FAX: (714) 453-9602
R.C.E. 18275 �-
�
30-25
ilQtviJf�\

SAN BERNARDINO AVENUE /

OLIVE STREET
DATE: XX
TWO WORKING DAYS BEFORE YOU DIG DATE: ___ _ SHEET 2 OF 3 APPROVED: _______ DATE: ___ _
PLAN NO. 61 60

CITY ENGINEER
NAME: VICTOR ORTIZ, P.E.

R.C.E.: 73848
6/6/2024

Page 441 of 735 ends

PROPOSED PHASE DIAGRAM

GROUP A GROUP B
LEGEND: w
=>
aJc:l VIDEO DETECTION SYSTEM z
......

I l
' I
- <l----1>
T
�
z
0:::
-

L UNUSED
w <l----1> I "' � ADVANCE DETECTION AREA > <( CONDUCTOR SCHEDULE 0 ,: 0 <( BICYCLE LOOP DETECTION � f- if)
if)
SAN
- - -------- - -
z "1
<( 0 N
- - -
w
�

BERNARDINO AVENUE
0 0:::
u
I
, .
11 '
I
I " '
I J IO
ji I
"'
I
"'
I
24'
0 <D
I
� �
("')()
,,)--/ l"
'
4 21
I
I
I
I
20·
_a_
;- STREET LIGHT POLE TO

BE REMOVED BY

COL TON ELECTRIC
----------------,--,,-------- ------- ffi\ : J -- ' ," f> "
/ /) ,�1�:' :�\ _,<�314171
4 @ 5 � re. ----< L,./ .,,,,;:;;;;1\ LO
"1
!l)1 ¢2
N
�
z

UNUSED UNUSED
0:::
¢5 ¢6
¢3 ¢4
UNUSED
!!
¢7 ¢8

OLIVE STREET
!30 MPH!
185' TO
5 CROSSWALK
'""""".�" � 1'21 .u..._ ��
fsl /\
PROVIDE 5' CLEARANCE 0 ,. / /8\
BETW§EN POWER POLE AND r.;-';:

H J 1?5� e -
-++
I
� '4f ;_ �-,�(E',:C.

I
=:....------ - ---_....,.--,,--- - - -------- - - -------- - - --- LO TRAFFIC SIGNAL POLE. '-H l ),c .. ;·. =�=�=-,;e�=�=�=t,o'nn',,, ;\cl 1====-==-=-e � \Y, •I.: _ e -==:--:===-=,�oofhi1. ,::::::oi±:1-=i:=-=-e�-'===--==="=-{ �oh�, ;;=:-=_:=_::::_-,Q'-Jtla ----+ , · ·''h , '-. //., L � • � .:;/ I "e 1 _ ,v, · '- , - " "' e =oh
- "'
= C
C JL1Ll
�l. • • ...--:-- - f " £ I,( '
- k>�
-
-
- ---g- ---- - 1---g- --- - ---g- --- --+---9- --- - 9 r--- -J+..Hr+-H-+_, ' '\. J \ r'-' ,Y..,,
- - - - - - - - - - - - - - - - - - -� > � I 3 I 4 I 7 j l / I >-------j!..;l C\' 1� - �
"
c -- -�� ..-
"'
--
\c -- -- - -
tc -- -- - - \c -- �, ..l
-
ti,.�,.....,----
- _- _-____ - _ -__ - -��--=
:_: __ ----,
,
�-�-�-�
-
�'r<::tc: :=_ -�w�-"=�:�}=��::��\�c:=� -w
��-"
=��
-
2:l��-=
���-��-
_"
_
t
�
c
:=
�
_
w
"� _:-�::::(��:'- � ...... 1
�
o��l'�"'��ij/ � -cl�=:;;:\-,
--t-t:;:t-�-t-t
'i"
--- �--+
o
�,::,"'
1 1-tw--tw-iilv_ff.:F!c:=
"=
.
-
tr
:-=�\�
-
-:-
- ;
----t-
;-_-,.c:_=_=_ =_= _=_=_=- --
--= -=-=- =- ----= -=-= = � = = = = = = = = = = = = = = = = = = = � = = = = = = = "'
I
- - -tc
�
w
tr e
e e
I'
31,, rv w w w --
I '
, ' "
• -+-
-� 1 i \c 1-�E::::�i:+,�C::'-�$-�������,-�����������������������t§:�������� e Jc e "'-' - Ce e ID ,��� " / � gJ \� � 4� � ,(0 J
\
\
I_
ISJ
_ t'b---isi �
,.
,,
""•
,_ Ir Ir ,_
p
,,
\_ ABANDON STREET ;,. L..::'J , "= ,,. '\
+t+llk--'.Pii - -
,,,
- --'---'-------
V �
I "'
OF STREET LIGHT BE REMOVED BY , /\ / �,,bii,iij, 5• -
1 '\ '
6 \
-- -- -
LIGHT CONDUIT EAST N STREET LIGHT POLE TO _//0 �� I I
I
COLTON ELECTRIC /9, B, ,/ I I�, -- I
' - - -:2
:
1 :
o
=·=T=O===---- - .._ __ - - --------
- - ........... _
M
_
O
_
D
-
IF
-
Y
-
SP
_
R
_
IN
-
K
-
LE;
S
-
TO _J
1 ' I 1 � � '/ :'.� ......

CROSSWALK PREVENT SPRAY ON CABINETS / ]J:j :.,// \ �'
",j
u
1 !35 MPH! ABANDON STREET LIGHT

CONDUIT AND PULL BOX
�
7 �
3 �
4 �
y � , f/ :� /� C ��:· d i
:

I JO "
I
I
,, '.:
,. I
STREET LIGHT POLE TO �

BE REMOVED BY

COL TON ELECTRIC
Q)
I
/
1 : I
1 1
I
I
I
I in
< I

EXISTING BLOCK WALL
RUN No.

AWG
POLE PHASE & & & ill ill ill IA ill & A & A
0 - 1 - - - - - - - - - -
0 - 1 - - - - - - 1 - - -
© - 1 - - - - - - - 1 - 1
0 - 1 - - - - - - - 1 1 -
12CSC ©
- 1 1 - - 1 - 1 - - - -
© - 1 1 - - 1 - - - - - -
0 - 1 1 - 1 - - - - - - -
0 - 1 - 1 - - - - - - - -
0 - 1 - - - - - - - 1 - -
0 - 1 1 - - - - - - - - -
TOTAL 12CSC CABLES - 10 4 1 1 2 - 1 1 3 1 1
0 - 1 - - - - - - - - - -
0 - 1 - - - - - - 1 - - -
© - 1 - - - - - - - 1 - 1
0 - 1 - - - - - - - 1 1 -
©
- 1 1 - - 1 - - - - - -
3CSC ©
- 1 1 - - - - - - - 1 1
0 - 1 1 - 1 - - - - - - -
0 - 1 - 1 - - - - - - - -
0 - 1 - - - - - - - 1 - -
0 - 1 1 - - - - - - - - -
TOTAL 3CSC - 10 4 1 1 2 - 1 1 3 1 1
#6 9CN<'J... 5ER\1CE 2 - - - - - - - - - - -
#10 LUMN/>JRES 4 4 2 2 - 2 2 - 2 2 2 -
#12 IISNS - 4 2 2 - 2 2 - 2 2 2 -
12 SMFO COMM CABLE - - - - - - - - - - - -
CCTV CAT 6 ETHERNET - - - - - - - - - - - -

POWER - - - - - - - - - - - -
VIDEO
CABLE 1 1 1 1 1 1 1 1

DETECTION
- - - -
POWER - 1 1 1 - 1 1 - 1 1 1 -
IP CAMERA CAT 6 ETHERNET - - - - - - - - - - - -

POWER - - - - - - - - - - - -
LOOP
DLC

DETECTION
- - - - - - - - - - - -

A - - - - - - - - - - - -
B - 2 2 - - 2 - - - - - -

C - - - - - - - - - - - -
DLC D - 2 2 2 - - - - - - - -

E - - - - - - - - - - - -
F - 2 - - - - - - - - - -

G - - - - - - - - - - - -
H - 3 - - - - - - - 3 - 3
TOTAL DLCs - 9 4 2 - 2 - - - 3 - 3
CONDUIT SIZE 2" 2/3.5" 3.5" 2.5" 2" 3" 2" 2" 2" 3" 2" 2"

POLE SCHEDULE
I 1,
I
I
I
24'
1 I 6'

STANDARD LUMINAIRE
SIGNAL

SIGNAL HEADS AND MOUNTINGS PEDESTRIAN PUSH BUTTON POLE LOCATION

IISNS (LED)
CONSTRUCTION NOTES:
� INSTALL 332 CABINET WITH MODEL 2070 CONTROLLER WITH 2033 SOFTWARE, 764 PHASE SELECTION AND 768 AUX. PANEL AND ALL ANCILLARY EQUIPMENT. [TI FURNISH AND INSTALL TYPE Ill CF ELECTRICAL EQUIPMENT ENCLOSURE PER CALTRANS STANDARD PLAN ES-2F
[TI INSTALL 721 OPTICOM DETECTION. INCLUDE CABLE AND MOUNTING HARDWARE "1 FURNISH AND INSTALL ITERIS VANTAGE VECTOR NEXT DETECTOR MODEL #4010260-01 ON L.:'.J SIGNAL MAST ARM PER CALTRANS STANDARD PLAN ES-7R. DETAIL "B r-;:-J REMOVE EXISTING CURB RAMP, AND CONTRUCT NEW CURB RAMP PER CASE A PER CAL TRANS L..::..J REVISED STANDARD PLAN RSP A88A. INSTALL 8" RETAINING CURB.

Q REMOVE EXISTING CURB RAMP, AND CONTRUCT NEW CURB RAMP PER CASE C PER CALTRANS � REVISED STANDARD PLAN RSP A88A. [TI INSTALL LED TYPE IISNS.
0 REMOVE INTERFERING WALL FOOTING AND 4" CONDUIT.
�-H-1o---1t--->+---J-+---f'-' ---,H � �· '
I 24'
133'
'I
[ I
I
I
I I
I
Q)
I
I I 1, I
I : I I
I
1 1
I I
I
I I
I I
l< 1 I � �I I:
11 'I
11 I 1
11 I 1
11 11
11 11 (
11 '
11 'I I
I
I
I
I
I
I 1
-u
I
I
.
30 I
I
1j 0
1 1I
JI
I
I
I
I
I
I
I
� ii ] C I
I
iu,
:5
�
f2 (f) if)
o 0
"1 0:::

NU
No.

TYPE
0 1-A
0--
0:::
0 u 17-2-100 <( rn
ECR
I ©
1-A
<(
cV
®
19-2-100
©
1-A
,B -B, ©
19-2-100
C, 6 ©
1-A
®
19-2-100
DETAIL
"A" CD PPB POST
(NO SCALE) 0
1-A
£,/ �Transportation ct Energy Solutions,
3400 INLAND EMPIRE BLVD,
STE. 227 ONTARIO, CA 91764
Inc.

PHONE: (714) 685-0001 FAX: (714) 453-9602
Underground Service Alert
Co/1:TOLL FREE
1-800
422
-
4133

TWO WORKING DAYS BEFORE YOU DIG
M.A.

HEIGHT M.A. LED VEHICLE PED PHASE ARROW
1 o·
-
30' 12· 165
1 o·
-
30' 12· 165
1 o·
-
30' 12· 165
1 o·
-
30' 12· 165
- -
1 o·
-
TV-1-T SP-1-T
15' SV-1-T MAS SP-1-T
TV-1-T SP-1-T
25' SV-1-T MAS-4B SP-1-T
TV-1-T SP-1-T
25' SV-1-T MAS SP-1-T
TV-1-T SP-1-T
25' MAS-4B
TV-1-T SP-1-T

CITY OF COLTON

PUBLIC WORKS DEPARTMENT
PREPARED BYc TRANSPORTATION & ENERGY
SOLUTIONS, INC.

NAME, DAVID E NELSON
4 1
1 8
2 ..
2 8
4 EXPIRES, 6/30/25
R.C.E. 18275 �
RE
�-
0 .
6 _:--
:
0-25
ktzoi)/1/)f,��
DATE, ___ _
(BLUE W/ CITY
LOCAllO'J A B C
LOGO)
EAST 1' 2·
NORTH 6' 2· San Bernardino Ave
NORTH
WEST
SOUTH
SOUTH
EAST
WEST
1' 2·
2· 8'
1' 2·
3' 2·
6' 2·
6' 2·
2· 2·
5' 2·
20 10 --0
1 "=20'

TRAFFIC SIGNAL PLAN

MERIDIAN AVENUE
AT
Meridian Ave
Olive St
Meridian Ave
20 ---�
40 GRAPHIC SCALE
SCALE
HORIZ:
1 :20
VERT:

SAN BERNARDINO AVENUE /

OLIVE STREET
DRAWN BY: TRS/KBG
DATE: XX
SHEET 3 OF 3
APPROVED,------- DATEc ___ _
PLAN NO. 61 60

CITY ENGINEER
NAME, VICTOR ORTIZ. P.E.

R.C.E.c 73848
6/6/2024

Page 442 of 735 ends

37 GENERAL CONDITIONS
ARTICLE 1. DEFINITIONS
a. Acceptable, Acceptance or words of similar import shall be understood to be the acceptance of the Engineer and/or the City.
b. Act of God an Act of God is an earthquake of magnitude 3.5 on the Richter scale and tidal waves.
c. Approval means written authorization by Engineer and/or City. d. Contract Documents includes all documents as stated in the Contract. e. City and Contractor are those stated in the Contract. The terms City and Owner may be used interchangeably.
f. Day shall mean calendar day unless otherwise specifically designated. g. Engineer shall mean the General Manager, or his or her designee, of the Department of Public Works for the City of Colton, acting either directly or through properly authorized agents, such as agents acting within the scope of the particular duties entrusted to them.

Also sometimes referred to as the “City’s Representative” or “Representative” in the Contract Documents.
h. Equal, Equivalent, Satisfactory, Directed, Designated, Selected, As Required and similar words shall mean the written approval, selection, satisfaction, direction, or similar action of the Engineer and/or City.
i. Indicated, Shown, Detailed, Noted, Scheduled or words of similar meaning shall mean that reference is made to the drawings, unless otherwise noted. It shall be understood that the direction, designation, selection, or similar import of the Engineer and/or City is intended, unless stated otherwise.
j. Install means the complete installation of any item, equipment or material. k. Material shall include machinery, equipment, manufactured articles, or construction such as form work, fasteners, etc., and any other classes of material to be furnished in connection with the Contract. All materials shall be new unless specified otherwise. l. Perform shall mean that the Contractor, at Contractor’s expense, shall take all actions necessary to complete The Work, including furnishing of necessary labor, tools, and equipment, and providing and installing Materials that are indicated, specified, or required to complete such performance.
m. Project is The Work planned by City as provided in the Contract Documents.

Page 443 of 735 ends

38 n. Provide shall include provide complete in place, that is furnish, install, test and make ready for use.
o. Recyclable Waste Materials shall mean materials removed from the Project site which are required to be diverted to a recycling center rather than an area landfill. Recyclable Waste Materials include asphalt, concrete, brick, concrete block, and rock. p. Specifications means that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards and workmanship for the work. Except for Sections 1-9 of the Standard Specifications for Public Works Construction (“Greenbook”), 2021 edition which are specifically excluded from incorporation into these Contract Documents, the Work shall be done in accordance with the Greenbook, including all current supplements, addenda, and revisions thereof. In the case of conflict between the Greenbook and the Contract Documents, the Contract Documents shall prevail.
q. The Work means the entire improvement planned by the City pursuant to the Contract Documents.
r. Work means labor, equipment and materials incorporated in, or to be incorporated in the construction covered by the Contract Documents.

ARTICLE 2. CONTRACT DOCUMENTS
a. Contract Documents. The Contract Documents are complementary, and what is called for by one shall be as binding as if called for by all.
b. Interpretations. The Contract Documents are intended to be fully cooperative and to be complementary. If Contractor observes that any documents are in conflict, the Contractor shall promptly notify the Engineer in writing. In case of conflicts between the Contract Documents, the order of precedence shall be as follows:

1. Change Orders or Work Change Directives

2. Addenda

3. Special Provisions (or Special Conditions)

4. Technical Specifications

5. Plans (Contract Drawings)

6. Contract

7. General Conditions

8. Instructions to Bidders

9. Notice Inviting Bids

10. Contractor’s Bid Forms

11. Greenbook Standard Specifications (Sections 1-9 Excluded)

12. Standard Plans

13. Reference Documents
With reference to the Drawings, the order of precedence shall be as follows:

Page 444 of 735 ends

39 1. Figures govern over scaled dimensions

2. Detail drawings govern over general drawings

3. Addenda or Change Order drawings govern over Contract Drawings

4. Contract Drawings govern over Standard Drawings

5. Contract Drawings govern over Shop Drawings
c. Conflicts in Contract Documents. Notwithstanding the orders of precedence established above, in the event of conflicts, the higher standard shall always apply. d. Organization of Contract Documents. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing The Work among subcontractors or in establishing the extent of Work to be performed by any trade.

ARTICLE 3. CONTRACTS DOCUMENTS: COPIES & MAINTENANCE
Contractor will be furnished, free of charge, five (5) copies of the Contract Documents.

Additional copies may be obtained at cost of reproduction.

Contractor shall maintain a clean, undamaged set of Contract Documents at the Project site.

ARTICLE 4. DETAIL DRAWINGS AND INSTRUCTIONS
a. Examination of Contract Documents. Before commencing any portion of The Work, Contractor shall again carefully examine all applicable Contract Documents, the Project site and other information given to Contractor as to materials and methods of construction and other Project requirements. Contractor shall immediately notify the Engineer of any potential error, inconsistency, ambiguity, conflict or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any subcontractor proceed with Work if uncertain as to the applicable requirements.
b. Additional Instructions. After notification of any error, inconsistency, ambiguity, conflict or lack of detail or explanation, the Engineer will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work.
c. Quality of Parts, Construction and Finish. All parts of The Work shall be of the best quality of their respective kinds and the Contractor must use all diligence to inform itself fully as to the required construction and finish. In no case shall Contractor proceed with The Work without obtaining first from the Engineer such Approval may be necessary for the proper performance of Work.
d. Contractor’s Variation from Contract Document Requirements. If it is found that the Contractor has varied from the requirements of the Contract Documents including the requirement to comply with all applicable laws, ordinances, rules and regulations, the

Page 445 of 735 ends

40 Engineer may at any time, before or after completion of the Work, order the improper Work removed, remade or replaced by the Contractor at the Contractor’s expense.

ARTICLE 5. EXISTENCE OF UTILITIES AT THE WORK SITE
a. The City has endeavored to determine the existence of utilities at the Project site from the records of the owners of known utilities in the vicinity of the Project. The positions of these utilities as derived from such records are shown on the Plans. b. No excavations were made to verify the locations shown for underground utilities. The service connections to these utilities are not shown on the plans. It shall be the responsibility of the Contractor to determine the exact location of all service connections.

The Contractor shall make its own investigations, including exploratory excavations, to determine the locations and type of service connections, prior to commencing Work which could result in damage to such utilities. The Contractor shall immediately notify the City in writing of any utility discovered in a different position than shown on the Plans or which is not shown on the Plans.
c. All water meters, water valves, fire hydrants, electrical utility vaults, telephone vaults, gas utility valves, and other subsurface structures shall be relocated or adjusted to final grade by the Contractor. Locations of existing utilities shown on the Plans are approximate and may not be complete. The Contractor shall be responsible for coordinating its Work with all utility companies during the construction of The Work. d. Notwithstanding the above, pursuant to Section 4215 of the Government Code, the City has the responsibility to identify, with reasonable accuracy, main or trunkline facilities on the plans and specifications. In the event that main or trunkline utility facilities are not identified with reasonable accuracy in the plans and specifications made a part of the invitation for bids, City shall assume the responsibility for their timely removal, relocation, or protection.
e. Contractor, except in an emergency, shall contact the appropriate regional notification center, Southern California Underground Service Alert at 1-800-227-2600 at least two working days prior to commencing any excavation if the excavation will be performed in an area which is known, or reasonably should be known, to contain subsurface installations other than the underground facilities owned or operated by the City, and obtain an inquiry identification number from that notification center. No excavation shall be commenced or carried out by the Contractor unless such an inquiry identification number has been assigned to the Contractor or any subcontractor of the Contractor and the City has been given the identification number by the Contractor.

ARTICLE 6. SCHEDULE
a. Estimated Schedule. Within fourteen (14) days after the issuance of the Notice to Proceed, Contractor shall prepare a Project schedule and shall submit this to the Engineer for Approval. The receipt or Approval of any schedules by the Engineer or the City shall not in any way relieve the Contractor of its obligations under the Contract Documents. The Contractor is fully responsible to determine and provide for any and all staffing and

Page 446 of 735 ends

41 resources at levels which allow for good quality and timely completion of the Project.

Contractor’s failure to incorporate all elements of Work required for the performance of the Contract or any inaccuracy in the schedule shall not excuse the Contractor from performing all Work required for a completed Project within the specified Contract time period. If the required schedule is not received by the time the first payment under the Contract is due, Contractor shall not be paid until the schedule is received, reviewed and accepted by the Engineer.
b. Schedule Contents. The schedule shall allow enough time for inclement weather. The schedule shall indicate the beginning and completion dates of all phases of construction; critical path for all critical, sequential time related activities; and “float time” for all “slack” or “gaps” in the non-critical activities. The schedule shall clearly identify all staffing and other resources which in the Contractor’s judgment are needed to complete the Project within the time specified for completion. Schedule duration shall match the Contract time.

Schedules indicating early completion will be rejected. c. Schedule Updates. Contractor shall continuously update its construction schedule.

Contractor shall submit an updated and accurate construction schedule to the Engineer whenever requested to do so by Engineer and with each progress payment request. The Engineer may withhold progress payments or other amounts due under the Contract Documents if Contractor fails to submit an updated and accurate construction schedule.

ARTICLE 7. SUBSTITUTIONS
a. Pursuant to Public Contract Code Section 3400(b) the City may make a finding that is described in the invitation for bids that designates certain products, things, or services by specific brand or trade name.
b. Unless specifically designated in the Contract Documents, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in the Contract Documents. However, the City may have adopted certain uniform standards for certain materials, processes and articles. c. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with the Contractor. The City has the complete and sole discretion to determine if a

Page 447 of 735 ends

42 material, process or article is an “or equal” material, process or article that may be substituted.
d. Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from the Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution. e. The Contractor shall bear all of the City’s costs associated with the review of substitution requests.
f. The Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article.
g. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400.

ARTICLE 8. SHOP DRAWINGS
a. Contractor shall check and verify all field measurements and shall submit with such promptness as to provide adequate time for review and cause no delay in his own Work or in that of any other contractor, subcontractor, or worker on the Project, six (6) copies of all shop or setting drawings, calculations, schedules, and materials list, and all other provisions required by the Contract. Contractor shall sign all submittals affirming that submittals have been reviewed and approved by Contractor prior to submission to Engineer. Each signed submittal shall affirm that the submittal meets all the requirements of the Contract Documents except as specifically and clearly noted and listed on the cover sheet of the submittal.
b. Contractor shall make any corrections required by the Engineer, and file with the Engineer six (6) corrected copies each, and furnish such other copies as may be needed for completion of the Work. Engineer’s approval of shop drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called Engineer’s attention to such deviations at time of submission and has secured the Engineer’s written Approval. Engineer’s Approval of shop drawings shall not relieve Contractor from responsibility for errors in shop drawings.

Page 448 of 735 ends

43 ARTICLE 9. SUBMITTALS
a. Contractor shall furnish to the Engineer for approval, prior to purchasing or commencing any Work, a log of all samples, material lists and certifications, mix designs, schedules, and other submittals, as required in the specifications. The log shall indicate whether samples will be provided in accordance with other provisions of this Contract. b. Contractor will provide samples and submittals, together with catalogs and supporting data required by the Engineer, to the Engineer within a reasonable time period to provide for adequate review and avoid delays in the Work.
c. These requirements shall not authorize any extension of time for performance of this Contract. Engineer will check and approve such samples, but only for conformance with design concept of work and for compliance with information given in the Contract Documents. Work shall be in accordance with approved samples and submittals.

ARTICLE 10. MATERIALS
a. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, water, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities of every nature whatsoever necessary to execute and complete this Contract within specified time.
b. Unless otherwise specified, all materials shall be new and the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality. c. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of The Work and shall be stored properly and protected asrequired by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work.
d. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the work and agrees upon completion of all work to deliver the Project, to the City free from any claims, liens, or charges.
e. Materials shall be stored on the Project site in such manner so as not to interfere with any operations of the City or any independent contractor.

ARTICLE 11. CONTRACTOR’S SUPERVISION
Contractor shall continuously keep at the Project site, a competent and experienced full-time Project superintendent approved by the City. Superintendent must be able to proficiently speak, read and write in English. Contractor shall continuously provide efficient supervision of the Project.

Page 449 of 735 ends

44 ARTICLE 12. WORKERS
a. Contractor shall at all times enforce strict discipline and good order among its employees.

Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.
b. Any person in the employ of the Contractor whom the City may deem incompetent or unfit shall be dismissed from The Work and shall not be employed on this Project except with the written Approval of the City.

ARTICLE 13. SUBCONTRACTORS
a. Contractor agrees to bind every subcontractor to the terms of the Contract Documents as far as such terms are applicable to subcontractor’s portion of The Work. Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by Contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the City.
b. The City reserves the right to approve all subcontractors. The City’s Approval of any subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.
c. Prior to substituting any subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code section 4100 et seq.

ARTICLE 14. PERMITS AND LICENSES
Permits and licenses necessary for prosecution of The Work shall be secured and paid for by Contractor, unless otherwise specified in the Contract Documents. a. Contractor shall obtain and pay for all other permits and licenses required for The Work, including excavation permit and for plumbing, mechanical and electrical work and for operations in or over public streets or right of way under jurisdiction of public agencies other than the City.
b. The Contractor shall arrange and pay for all off-site inspection of the Work related to permits and licenses, including certification, required by the specifications, drawings, or by governing authorities, except for such off-site inspections delineated as the City's responsibility pursuant to the Contract Documents.
c. Before Acceptance of the Project, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to the City.

Page 450 of 735 ends

45 ARTICLE 15. UTILITY USAGE
a. All temporary utilities, including but not limited to electricity, water, gas, and telephone, used on the Work shall be furnished and paid for by Contractor. Contractor shall provide necessary temporary distribution systems, including meters, if necessary, from distribution points to points on The Work where the utility is needed. Upon completion of The Work, Contractor shall remove all temporary distribution systems. b. Contractor shall provide necessary and adequate utilities and pay all costs for water, electricity, gas, oil, and sewer charges required for completion of the Project. c. All permanent meters Installed shall be listed in the Contractor’s name until Project Acceptance.
d. If the Contract is for construction in existing facilities, Contractor may, with prior written Approval of the City, use the City’s existing utilities by compensating the City for utilities used by Contractor.

ARTICLE 16. INSPECTION FEES FOR PERMANENT UTILITIES
All inspection fees and other municipal charges for permanent utilities including, but not limited to, sewer, electrical, phone, gas, water, and irrigation shall be paid for by the City. Contractor shall be responsible for arranging the payment of such fees, but inspection fees and other municipal fees relating to permanent utilities shall be paid by the City. Contractor may either request reimbursement from the City for such fees, or shall be responsible for arranging and coordination with City for the payment of such fees.

ARTICLE 17. TRENCHES
a. Trenches Five Feet or More in Depth. The Contractor shall submit to the City, in advance of excavation, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from the hazard of caving ground during the excavation of any trench or trenches five feet or more in depth. If the plan varies from shoring system standards, the plan shall be prepared by a registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations.
b. Excavations Deeper than Four Feet. If work under this Contract involves digging trenches or other excavation that extends deeper than four feet below the surface, Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any:
1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.

Page 451 of 735 ends

46 2) Subsurface or latent physical conditions at the site differing from those indicated. 3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract.

The City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of The Work, shall issue a change order under the procedures described in the Contract Documents.

In the event that a dispute arises between the City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any part of The Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.

ARTICLE 18. DIVERSION OF RECYCLABLE WASTE MATERIALS
In compliance with the applicable City’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests.

Contractor shall complete and execute any certification forms required by City or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of the Contractor.

ARTICLE 19. REMOVAL OF HAZARDOUS MATERIALS
Should Contractor encounter material reasonably believed to be polychlorinated biphenyl (PCB) or other toxic wastes and hazardous materials which have not been rendered harmless at the Project site, the Contractor shall immediately stop work at the affected Project site and shall report the condition to the City in writing. The City shall contract for any services required to directly remove and/or abate PCBs and other toxic wastes and hazardous materials, if required by the Project site(s), and shall not require the Contractor to subcontract for such services. The Work in the affected area shall not thereafter be resumed except by written agreement of the City and Contractor.

ARTICLE 20. SANITARY FACILITIES
Contractor shall provide sanitary temporary toilet buildings for the use of all workers. All toilets shall comply with local codes and ordinances. Toilets shall be kept supplied with toilet paper and shall have workable door fasteners. Toilets shall be serviced no less than once weekly and shall be present in a quantity of not less than 1 per 20 workers as required by CAL-OSHA regulation. The toilets shall be maintained in a sanitary condition at all times. Use of toilet

Page 452 of 735 ends

47 facilities in The Work under construction shall not be permitted. Any other Sanitary Facilities required by CAL-OSHA shall be the responsibility of the Contractor.

ARTICLE 21. AIR POLLUTION CONTROL
Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes.

All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements.

ARTICLE 22. COMPLIANCE WITH STATE STORM WATER PERMIT
a. Contractor shall be required to comply with all conditions of the State Water Resources Control Board (“State Water Board”) National Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction Activity (“Permit”) for all construction activity which results in the disturbance of in excess of one acre of total land area or which is part of a larger common area of development or sale. Contractor shall be responsible for filing the Notice of Intent and for obtaining the Permit. Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (“SWPPP”) prior to initiating Work. In bidding on this Contract, it shall be Contractor’s responsibility to evaluate the cost of procuring the Permit and preparing the SWPPP as well as complying with the SWPPP and any necessary revision to the SWPPP. Contractor shall comply with all requirements of the State Water Resources Control Board. Contractor shall include all costs of compliance with specified requirements in the Contract amount. b. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, monitoring and reporting requirements as required by the Permit. Contractor shall provide copies of all reports and monitoring information to the Engineer. c. Contractor shall comply with the lawful requirements of any applicable municipality, the City, drainage district, and other local agencies regarding discharges of storm water to separate storm drain system or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs. d. Storm, surface, nuisance, or other waters may be encountered at various times during construction of The Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom. e. Failure to comply with the Permit is in violation of federal and state law. Contractor hereby agrees to indemnify and hold harmless City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, losses or liabilities of any kind or nature which City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for noncompliance with the Permit arising out of or in connection with the Project, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its

Page 453 of 735 ends

48 officials, officers, agents, employees or authorized volunteers. City may seek damages from Contractor for delay in completing the Contract in accordance with the Contract Documents, caused by Contractor’s failure to comply with the Permit.

ARTICLE 23. CLEANING UP
a. Contractor at all times shall keep premises free from debris such as waste, rubbish, and excess materials and equipment. Contractor shall not store debris under, in, or about the premises. Upon completion of Work, Contractor shall clean the interior and exterior of the building or improvement including fixtures, equipment, walls, floors, ceilings, roofs, window sills and ledges, horizontal projections, and any areas where debris has collected so surfaces are free from foreign material or discoloration. Contractor shall clean and polish all glass, plumbing fixtures, and finish hardware and similar finish surfaces and equipment and contractor shall also remove temporary fencing, barricades, planking and construction toilet and similar temporary facilities from site. Contractor shall also clean all buildings, asphalt and concrete areas to the degree necessary to remove oil, grease, fuel, or other stains caused by Contractor operations or equipment.
b. Contractor shall fully clean up the site at the completion of The Work. If the Contractor fails to immediately clean up at the completion of The Work, the City may do so and the cost of such clean up shall be charged back to the Contractor.

ARTICLE 24. LAYOUT AND FIELD ENGINEERING
All field engineering required for laying out The Work and establishing grades for earthwork operations shall be furnished by the Contractor at its expense. Layout shall be done by a registered civil engineer Approved by the Engineer. Any required “as-built” drawings of the Work shall be prepared by the registered civil engineer.

ARTICLE 25. EXCESSIVE NOISE
a. The Contractor shall use only such equipment on the work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by CAL-OSHA.
b. The Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.

Page 454 of 735 ends

49 ARTICLE 26. TESTS AND INSPECTIONS
a. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or public authority require any part of The Work to be tested or Approved, Contractor shall provide the Engineer at least two (2) working days notice of its readiness for observation or inspection. If inspection is by a public authority other than the City, Contractor shall promptly inform the City of the date fixed for such inspection. Required certificates of inspection (or similar) shall be secured by Contractor. Costs for City testing and City inspection shall be paid by the City. Costs of tests for Work found not to be in compliance shall be paid by the Contractor.
b. If any Work is done or covered up without the required testing or approval, the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost in compliance with the Contract Documents. c. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the City, and not by Contractor. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.
d. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the City so that the City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into The Work.
e. If the manufacture of materials to be inspected or tested will occur in a plant or location outside the geographic limits of City, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging.
f. Reexamination of Work may be ordered by the City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the City shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.

ARTICLE 27. PROTECTION OF WORK AND PROPERTY
a. The Contractor shall be responsible for all damages to persons or property that occur as a result of The Work. Contractor shall be responsible for the proper care and protection of all materials delivered and Work performed until completion and final Acceptance by the City. All Work shall be solely at the Contractor’s risk. Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed.

Contractor shall erect and properly maintain at all times, as required by field conditions

Page 455 of 735 ends

50 and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.
b. In an emergency affecting safety of life or of work or of adjoining property, Contractor, without special instruction or authorization from the Engineer, is hereby permitted to act to prevent such threatened loss or injury; and Contractor shall so act, without appeal, if so authorized or instructed by the Engineer or the City. Any compensation claimed by Contractor on account of emergency work shall be determined by and agreed upon by the City and the Contractor.
c. Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions. d. Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by The Work operations. Contractor shall:
1) Enclose the working area with a substantial barricade, and arrange work to cause minimum amount of inconvenience and danger to the public. 2) Provide substantial barricades around any shrubs or trees indicated to be preserved. 3) Deliver materials to the Project site over a route designated by the Engineer. 4) Provide any and all dust control required and follow the Applicable air quality regulations as appropriate. If the Contractor does not comply, the City shall have the immediate authority to provide dust control and deduct the cost from payments to the Contractor.
5) Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or directions of the Engineer. Contractor shall not unreasonably encumber the Project site with its materials.
6) Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by an approved civil engineer or land surveyor, at no cost to the City.
7) Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to the City. 8) Preserve and protect from injury all buildings, pole lines and all direction, warning and mileage signs that have been placed within the right-of-way.

Page 456 of 735 ends

51 9) At the completion of work each day, leave the Project site in a clean, safe condition.
10) Comply with any stage construction and traffic handling plans. Access to residences and businesses shall be maintained at all times.

These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the Work involved in the preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefor. e. Should damage to persons or property occur as a result of The Work, Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired. The City shall be entitled to inspect and copy any such documentation, video, or photographs.

ARTICLE 28. CONTRACTORS MEANS AND METHODS
Contractor is solely responsible for the means and methods utilized to Perform The Work. In no case shall the Contractor’s means and methods deviate from commonly used industry standards.

ARTICLE 29. INSPECTOR’S FIELD OFFICE
a. The Contractor shall be responsible for providing the inspector’s field office. The Office shall be a substantial waterproof construction with adequate natural light and ventilation by means of stock design windows. Door shall have a key type lock or padlock clasp. The office shall have heating and air conditioning and shall be equipped with a telephone, a telephone answering machine, and a fax machine at Contractor’s expense. b. A table satisfactory for the study of plans and two chairs shall be Provided by Contractor.

Contractor shall Provide and pay for adequate electric lights, local telephone service, and adequate heat and air conditioning for the field office until authorized removal.

ARTICLE 30. AUTHORIZED REPRESENTATIVES
The City shall designate representatives, who shall have the right to be present at the Project site at all times. The City may designate an inspector who shall have the right to observe all of the Contractor’s Work. The inspector is not authorized to make changes in the Contract Documents.

The inspector shall not be responsible for the Contractor’s failure to carry out The Work in accordance with the Contract Documents. Contractor shall provide safe and proper facilities for such access.

ARTICLE 31. HOURS OF WORK
a. Eight (8) hours of work shall constitute a legal day’s work. The Contractor and each subcontractor shall forfeit, as penalty to the City, twenty-five dollars ($25) for each worker employed in the execution of Work by the Contractor or any subcontractor for each day during which such worker is required or permitted to work more than eight (8)

Page 457 of 735 ends

52 hours in any one day and forty (40) hours in any week in violation of the provisions of the Labor Code, and in particular, Section 1810 to Section 1815, except as provided in Labor Code Section 1815.
b. Work shall be accomplished on a regularly scheduled eight (8) hour per day work shift basis, Monday through Friday, between the hours of 7:00 a.m. and 5:00 p.m. c. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project site, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on City-observed holidays, unless otherwise Approved by the Engineer:
1) Powered Vehicles
2) Construction Equipment
3) Loading and Unloading Vehicles
4) Domestic Power Tool.

ARTICLE 32. PAYROLL RECORDS
a. Pursuant to Labor Code Section 1776, the Contractor and each subcontractor shall maintain weekly certified payroll records showing the name, address, social security number, work classification, straight time and overtime hours paid each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed in connection with the work. Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor shall also require subcontractor(s) to certify weekly payroll records under penalty of perjury. b. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City. The Contractor shall also provide the following:
1) A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.
2) A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the Department of Industrial Relations (“DIR”).
c. The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.
d. Any copy of records made available for inspection and furnished upon request to the public shall be marked or obliterated in such a manner as to prevent disclosure of an

Page 458 of 735 ends

53 individual’s name, address, and social security number. The name and address of the Contractor or any subcontractor shall not be marked or obliterated. e. In the event of noncompliance with the requirements of this Section, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notice specifying any item or actions necessary to ensure compliance with this section. Should noncompliance still be evident after such ten (10) day period, the Contractor shall, as a penalty to the City, forfeit Twenty-five Dollars ($25.00) for each day, or portion thereof, for each worker until strict compliance is effectuated. Upon the request of the DIR, such penalties shall be withheld from contract payments.

ARTICLE 33. PREVAILING RATES OF WAGES
a. The Contractor is aware of the requirements of Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects.

Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Agreement from the website of the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov/dlsr/. In the alternative, the Contractor may view a copy of the prevailing rates of per diem wages at the City. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.
b. The Contractor and each subcontractor shall forfeit as a penalty to the City not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the stipulated prevailing wage rate for any work done by him, or by any subcontract under him, in violation of the provisions of the Labor Code. The difference between such stipulated prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the stipulated prevailing wage rate shall be paid to each worker by the Contractor.
c. Contractor shall post, at appropriate conspicuous points on the Project site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.
d. If the Work involves federal funds or otherwise requires compliance with the Davis- Bacon Fair Labor Standards Act, the Contractor and all its subcontractors shall comply with the higher of the state or federal prevailing wage rates.

Page 459 of 735 ends

54 ARTICLE 34. EMPLOYMENT OF APPRENTICES
The Contractor’s attention is directed to the provisions of Sections 1777.5, 1777.6, and 1777.7 of the Labor Code concerning employment of apprentices by the Contractor or any subcontractor.

The Contractor shall obtain a certificate of apprenticeship before employing any apprentice pursuant to Section 1777.5, 1777.6, and 1777.7 of the Labor Code. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, the Administrator of Apprenticeships, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

ARTICLE 35. NONDISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY Pursuant to Labor Code Section 1735 and other applicable provisions of law, the Contractor and its subcontractors shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training without regard to their race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap.

ARTICLE 36. LABOR/EMPLOYMENT SAFETY
The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4.

WORKERS’ COMPENSATION INSURANCE
The Contractor shall Provide, during the life of this Contract, workers’ compensation insurance for all of the employees engaged in Work under this Contract, on or at the Project site, and, in case any of sublet Work, the Contractor shall require the subcontractor similarly to provide workers’ compensation insurance for all the latter’s employees as prescribed by State law. Any class of employee or employees not covered by a subcontractor’s insurance shall be covered by the Contractor’s insurance. In case any class of employees engaged in work under this Contract, on or at the Project site, is not protected under the Workers’ Compensation Statutes, the Contractor shall provide or shall cause a subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected. The Contractor is required to secure payment of compensation to his employees in accordance with the provisions of Section 3700 of the Labor Code. The Contractor shall file with the City certificates of his insurance protecting workers.

Company or companies providing insurance coverage shall be acceptable to the City, if in the form and coverage as set forth in the Contract Documents.

ARTICLE 37. EMPLOYER’S LIABILITY INSURANCE
Contractor shall provide during the life of this Contract, Employer’s Liability Insurance, including Occupational Disease, in the amount of, at least, one million dollars ($1,000,000.00) per person per accident. Contractor shall provide City with a certificate of Employer’s Liability Insurance.

Such insurance shall comply with the provisions of the Contract Documents. The

Page 460 of 735 ends

55 policy shall be endorsed, if applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and contain a Waiver of Subrogation in favor of the City.

ARTICLE 38. COMMERCIAL GENERAL LIABILITY INSURANCE
a. Contractor shall procure and maintain during the life of this Contract and for such other period as may be required herein, at its sole expense, Commercial General Liability insurance coverage, including but not limited to, premises liability, contractual liability, products/completed operations if applicable, personal and advertising injury – which may arise from or out of Contractor’s operations, use, and management of the Project site, or the performance of its obligations hereunder. Policy limits shall not be less than $2,000,000 per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess of such coverage, nor shall it limit Contractor’s indemnification obligations to the City, and shall not preclude the City from taking such other actions available to the City under other provisions of the Contract Documents or law.
c. Contractor shall make certain that any and all subcontractors hired by Contractor are insured in accordance with this Contract. If any subcontractor’s coverage does not comply with the foregoing provisions, Contractor shall indemnify and hold the City harmless from any damage, loss, cost, or expense, including attorneys’ fees, incurred by the City as a result thereof.
d. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.
e. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non-owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions, relating to liability for injury to or death of persons and damage to property. If the coverage contains one or more aggregate limits, a minimum of 50% of any such aggregate limit must remain available at all times; if over 50% of any aggregate limit has been paid or reserved, the City may require additional coverage to be purchased by Contractor to restore the required limits. Contractor may combine primary, umbrella, and as broad as possible excess liability coverage to achieve the total limits indicated above. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents.

Page 461 of 735 ends

56 ARTICLE 39. AUTOMOBILE LIABILITY INSURANCE
Contractor shall take out and maintain at all times during the term of this Contract Automobile Liability Insurance in the amount of, at least, one million dollars ($1,000,000). Such insurance shall provide coverage for bodily injury and property damage including coverage for non-owned and hired vehicles, in a form and with insurance companies acceptable to the City. Such insurance shall comply with the provisions of Article 30 below.

ARTICLE 40. BUILDER’S RISK [“ALL RISK”]
a. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s Risk [ “All Risk”] extended coverage insurance on all work, material, equipment, appliances, tools, and structures which are a part of the Contract and subject to loss or damage by fire, and vandalism and malicious mischief, in an amount to cover 100% of the replacement cost. The City accepts no responsibility until the Contract is formally accepted by the Governing Board for the work. The Contractor is required to file with the City a certificate evidencing fire insurance coverage.
b. Provide insurance coverage on completed value form, all-risk or special causes of loss coverage.
1) Insurance policies shall be so conditioned as to cover the performance of any extra work performed under the Contract.
2) Coverage shall include all materials stored on site and in transit. 3) Coverage shall include Contractor’s tools and equipment. 4) Insurance shall include boiler, machinery and material hoist coverage. c. Such insurance shall comply with the provisions of the Contract Documents.

ARTICLE 41. FORM AND PROOF OF CARRIAGE OF INSURANCE
a. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by the City Risk Manager. Carrier(s) shall have an A.M. Best rating of not less than an A:VIII. Insurance deductibles or self-insured retentions must be declared by the Contractor, and such deductibles and retentions shall have the prior written consent from the City. At the election of the City the Contractor shall either 1) reduce or eliminate such deductibles or self-insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses. b. Contractor shall cause its insurance carrier(s) to furnish the City with either 1) a properly executed original Certificates(s) of Insurance and certified original copies of Endorsements effecting coverage as required herein, or 2) if requested to do so in writing by the City Risk Manager, provide original Certified copies of policies including all

Page 462 of 735 ends