Meridian Consultants 43 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
This Addendum evaluates the potential incremental effects of the proposed project in comparison to baseline environmental conditions (buildout of the City in accordance with the 2013 General Plan).
There have been no substantial changes in circumstances since preparation of the General Plan EIR that would require major revisions to the EIR due to the involvement of new significant impacts or substantial increase in the severity of impacts previously identified.
3. No new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
a. The project will have one or more significant effects not discussed in the previous EIR or negative declaration
There have been no changes of substantial importance that would result in one or more significant effects not discussed in the original General Plan EIR. The proposed project would not result in any new significant effects relative to the original General Plan EIR. b. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
This Addendum reviews all environmental topics for the proposed project’s potential impacts. The project would result in beneficial impacts and would not result in any impacts more severe than the original General Plan EIR. c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
The proposed project would result in beneficial impacts to some categories and not affect the majority of impact categories. Implementation would not result in more severe impacts than the original General Plan EIR and no additional mitigation measures or alternatives were considered.
d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
See Response to condition C. No additional mitigation measures or alternatives were required or considered.
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
RESOLUTION NO._R-93-25__
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COLTON
APPROVING AMENDMENTS TO 2013 GENERAL PLAN MOBILITY
ELEMENT AS IT PERTAINS TO TRUCK ROUTES IN THE CITY OF
COLTON AND ADOPTING THE ACCOMPANYING ADDENDUM TO
THE ENVIRONMENTAL IMPACT REPORT FOR THE COLTON 2013
GENERAL PLAN UPDATE PROJECT (STATE CLEARINGHOUSE NO.
2012031037): FILE INDEX NUMBER DAP25-0024
WHEREAS, on August 20, 2013, the 2013 General Plan Mobility Element was adopted by the City Council by Resolution No. R-61-13; and
WHEREAS, the Mobility Element of the General Plan is a Citywide Traffic/Circulation Plan which outlines the City’s Goals and Policies for the orderly development of the local transportation system; and
WHEREAS, on November 11, 20 25, the Planning Commission of the City of Colton ("Planning Commission") conducted a duly noticed public hearing and recommended by a vote of 5 to 0 that the City Council adopt a General Plan Amendment No. DAP 25-0024 to amend the Mobility Element of the General Plan, to specifically address a revision to various policies as specified herein as related to truck routes within the 2013 Mobility Element; and
WHEREAS, on November 13, 2025, the Reche Canyon Traffic Ad Hoc Committee me and unanimously arrived at a consensus in reaffirming the Planning Commission’s recommendation to the City Council; and
WHEREAS, on ____________2025, the Colton City Council conducted a duly noticed public hearing to consider General Plan Amendment No. DAP25 -0024 to amend the Mobility Element of the General Plan; and
WHEREAS, the General Plan Amendment described herein is being adopted to implement the standards and requirements established by recent State law, specifically Assembly Bill 98 (2024) and Senate Bill 415 (2025); and
WHEREAS, all other legal prerequisites to the adoption of this Ordinance have occurred.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COLTON
DOES ORDAIN AS FOLLOWS:
SECTION 1. The City Council hereby adopts the recitals and findings set forth above and in the agenda report prepared in connection with this Ordinance.
SECTION 2. General Plan Consistency. Based on the entire record before the City Council and all written and oral evidence presented, including the staff report and the findings made in this Ordinance, the City Council hereby finds and determines that the proposed Amendment to the General Plan Mobility Element is consistent with the goals
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Colton City Council Resolution No. R-93-25
- 2 -
and policies of the City of Colton General Plan and is reasonably related to the public welfare of the citizens of the City and surrounding regions. Specifically, the Major Highway designation of San Bernardino Avenue has been determined to be unnecessary due to long -term and short -term traffic projections and also infeasible due to existing development constraints adjacent to that roadway.
SECTION 3. The Mobility Element of the General Plan , is hereby amended by deleting, modifying and/or adding the text as shown in the attached pages of the General Plan Mobility Element (Exhibit A-2) (New Text is shown Double Underline and deleted text is shown in strikethrough.)
SECTION 4. Severability. If any section, subsection, subdivision, sentence, clause, phrase, or portion of this Resolution for any reason is held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Resolution. The City Council hereby declares that it would have adopted this Resolution, and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared invalid or unconstitutional.
SECTION 5. Based on the entire record before it and all written and oral evidence presented, the City Council finds that pursuant to the California Environmental Quality Act (CEQA), under California Public Resources Code section 21080.17, the California Environmental Quality Act (“CEQA”), pursuant to the California Environmental Quality Act Guidelines, an Addendum to the 2013 EIR was prepared because the proposed modifications to the 2013 Mobility Element do not result in any of the circumstances requiring a Subsequent or Supplemental EIR within Exhibit-“A.1” of this resolution. The proposed modifications do not result in development that differs in street use or changes contrary to policies within the 2013 Mobility Element than what was assumed in the 2013 EIR, those modifications do not trigger the need for preparation of a Subse quent or Supplemental EIR under the criteria listed in CEQA Guidelines Sections 15162 and 15163, respectively. The Addendum to the 2013 EIR demonstrates that no substantial changes would result from the revised project modifications nor have the existing conditions in the project vicinity substantially changed such that major revisions to the 2013 EIR would be required. The project would not result in a new significant environmental effect or a substantial increase in the severity of previously identified significant effects. Specifically, the proposed Truck Route amendments, as compared to the 2016 Truck Route Master Plan, do not result in new or substantially greater significant impacts because the scale and nature of the proposed truck routes are sufficiently similar to that analyzed in the 2013 General Plan EIR such that the impacts of the proposed amendments to the 2016 Truck Route Master Plan are within the levels and types of environmental impacts disclosed in the 2013 General Plan EIR
SECTION 6. Certification/Publication. The City Clerk shall certify to the passage of the Resolution and cause the same or a summary thereof to be published within fifteen (15) days after adoption in a newspaper of general circulation published and circulated in the City of Colton.
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Colton City Council Resolution No. R-93-25
- 3 -
SECTION 7. This Resolution shall become effective thirty (30) days after its adoption in accordance with the provisions of California law. .
PASSED, APPROVED AND ADOPTED on this ___ day of ______, 2025.
___________________________________
Frank Navarro
Mayor
ATTEST:
__________________________________
Isaac T. Suchil
City Clerk
Exhibit A-1
of Reso #R-93-25
Addendum to 2013
General Plan EIR
23152.06300\44427883.1
EIR ADDENDUM
GENERAL PLAN AMENDMENT
AB 98 MOBILITY ELEMENT UPDATE
CITY OF COLTON
Prepared for:
City of Colton
Planning Department
659 N. La Cadena Drive
Colton, CA 92324
Prepared by:
Westlake Village
860 Hampshire Road, Suite P
Westlake Village, CA 91361
NOVEMBER 2025
Exhibit A-1
of Reso # R-93-25
Meridian Consultants i AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
TABLE OF CONTENTS
1.0 Introduction ................................ ................................ ................................ ........... 1
1.1 Overview .............................................................................................................. 1
1.2 Purpose ................................................................................................................ 1
1.3 City of Colton Background ..................................................................................... 2
1.4 Assembly Bill 98 ................................................................................................... 2
1.5 California Environmental Quality Act ..................................................................... 3
1.6 Environmental Procedures .................................................................................... 3
1.7 City of Colton General Plan (Approved Project) ...................................................... 5
1.8 Prior Environmental Documentation: General Plan Draft EIR .................................. 8
2.0 Project Description ................................ ................................ ................................ 10
2.1 Project Location ................................................................................................. 10
2.2 Project Background............................................................................................. 10
2.3 Project Characteristics ....................................................................................... 13
3.0 Environmental Analysis ................................ ................................ ......................... 23
3.1 Approach ..................................................................Error! Bookmark not defined.
3.2 Environmental Topics Determined To Have “No Impact” ...................................... 25
3.3 Environmental Factors Potentially Affected ......................................................... 25
3.4 Air Quality ........................................................................................................... 25
3.5 Greenhouse Gas Emissions ................................................................................ 29
3.6 Land Use & Planning ........................................................................................... 31
3.7 Noise and Vibration ............................................................................................ 33
3.8 Transportation/Traffic ......................................................................................... 37
4.0 Findings ................................ ................................ ................................ ................ 40
List of Figures
1 City of Colton Boundary ................................................................................................. 11 2 Truck Routes Existing Conditions .................................................................................... 12 3 Proposed Truck Route Removals .................................................................................... 20 4 Proposed Truck Routes Plan ........................................................................................... 21 5 Proposed Truck Route Plan and Land Use Map .............................................................. 22
Meridian Consultants 1 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
1.0 INTRODUCTION
1.1 OVERVIEW
This document is an Addendum to the City of Colton General Plan Environmental Impact Report (General Plan EIR), State Clearinghouse No. 20122031037, which was certified May 2013 . This Addendum evaluates the potential environmental impacts of the currently proposed updates to the Mobility Element of the General Plan in comparison to the General Plan adopted in May 2013. The 2013 General Plan serves as “baseline” conditions for the impact comparison. This Addendum was prepared for the City’s proposed amendment of the Mobility Element of the Colton General Plan and amendment of Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal Code (proposed Project), as defined in CEQA Guidelines Sections 15050−15051. The Lead Agency , the City of Colton, is defined as the agency with primary responsibility for approving and carrying out the proposed Project.
1.2 PURPOSE
The purpose of the proposed Project is to the bring the City into compliance with the recent legislation and its impact upon cities and counties located within a Warehouse Concentration Region (WCR) , as defined in Government Code Section 65098 , which states, “ ’Warehouse concentration region’ includes the unincorporated areas within Counties of Riverside and San Bernardino and the Cities of Chino, Colton, Fontana, Jurupa Valley, Moreno Valley, Ontario, Perris, Rancho Cucamonga, Redlands, Rialto, Riverside, and San Bernardino.” On October 3, 2025, Senate Bill 415 (SB 415) was signed into law providing various clarifications to AB 98. However, SB 415 did not alter the substantive requirements set forth by AB 98 for circulation element updates for cities and counties in the warehouse concentration region, such as Colton. As such, the City of Colton City Council is required to approved and adopt regulations to be in compliance with AB 98.
AB 98 introduces specific requirements for assigning truck routes and adopting them into the Circulation Element (Transportation and Mobility Element) of the General Plan. The City must adopt the following Truck Route Requirements:
• Truck Routes must be adopted by January 1, 2026, in the Warehouse Concentration Region (WCR) which includes the City of Colton.
• Truck Routes must maximize the use of major highways and only utilize commercial roads when necessary.
• Truck Routes will be provided in a Geographic Information System (GIS) format and will be made publicly accessible.
• Conspicuous signage will be installed to identify truck routes, truck parking, and appropriate idling locations.
1.0—Introduction
Meridian Consultants 2 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• The City must provide opportunities for public input and participation.
1.3 CITY OF COLTON BACKGROUND
Colton traces its beginnings to its founding as a railroad town. The original town of Colton, with its classic grid street network that is still evident today, was laid out when the Southern Pacific Railway (now Union Pacific) was constructed through the San Bernardino Valley on its way eastward from Los Angeles in 1875. The area around Colton was selected for a train stop instead of the City of San Bernardino due to the direct location of the town on the planned route. In fact, Colton was named for David Douty Colton, then Vice President of the Southern Pacific Railroad Company.
While the railroad defined the shape of early Colton, construction of Interstate 10 in 1957 bisected the City. Interstate 10 and later Interstate 215, opened in 1963, linked Colton by roadway to the region and the nation, but the freeways created divides that made it difficult for residents and employees of local businesses to move across town. The General Plan’s Mobility Element looks to re -establish connections to bind the community together again, even as large -scale improvements to rail lines and freeways proceed.
In 2013, the City of Colton ( City) completed an update of its General Plan, to establish a vision and guiding policies to shape and manage long term growth in the Colton planning area, which is referred to as the “General Plan Update” and is the subject of the Certified Environmental Impact Report. The General Plan Update is a long-range planning program, to guide the orderly growth and development of the Colton planning area over the long-term.
The adopted General Plan Update includes the City’s Mobility Element which establishes long‐term goals and policies designed to improve the local transportation system and create options for residents to move about the City. The Mobility Element balances the need for efficient traffic operations with the desire to maintain Colton as a safe and attractive community, one with walkable neighborhoods, successful business districts, and distinctive streets. Key transportation corridors— such as Mount Vernon Avenue and Valley Boulevard —must be able to accommodate new development and complement regional transportation while meeting local mobility needs. Policies in the Mobility and Land Use Elements together shape the overall physical structure and form of Colton.
1.4 ASSEMBLY BILL 98
The City of Colton proposes to update its 2013 General Plan Mobility Element to comply with Assembly Bill 98 (AB 98) passed on September 30, 2024, and the subsequent cleanup legislation, Senate Bill 415 (SB 415) passed on October 3, 2025. This legislation introduces significant changes to how California regulates logistics uses defined as facilities in excess of 250,000 square feet that
1.0—Introduction
Meridian Consultants 3 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
are primarily used for the handling, storage, and distribution of goods. A key component of the legislation is the requirement for cities designated by the legislation as warehouse concentration region jurisdictions to designate truck routes that are consi stent with the requirements of the bill (codified as Section 65302.02 of the Government Code) and incorporate the routes into the General Plan before January 1, 2026. This will supplement the City’s recent work in updating the City Zoning Code that resulted in the adoption of Ordinance O-01-23, adopted on February 21, 2023, amending various sections of Title 18 (Zoning Code) and providing new definitions, permitted uses, and Special Provisions which provide added standards for all City Industrial zones rel ated to truck and trail er storage uses, general warehouses, and warehouse logistics and distribution projects.
Per AB 98, the City must consider the following when updating the truck routes:
• Ensure efficient and safe routes for goods movement
• Maximize the use of freeways, highways, and major roadways (arterials/collectors fronted by commercial/industrial uses)
• Minimize exposure of sensitive receptors as defined by Section 65098(e) • Make a diligent effort to achieve public participation of all economic segments of the community
The proposed project would revise the City’s Mobility Element to include updated truck route designations, goals, and policies in compliance with the legislation.
1.5 CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
CEQA is a Statewide environmental law codified in the California Public Resources Code §§ 21000 - 21177. CEQA applies to most public agency decisions to carry out, authorize, or approve actions that have the potential to adversely affect the environment. CEQA requires that public agencies analyze and acknowledge the environmental consequences of their discretionary actions and consider alternatives and mitigation measures that could avoid or reduce significant adverse impacts to the environment when avoidance or reduction is feasible. The CEQA compliance process also gives other public agencies and the general public an opportunity to comment on a proposed project’s environmental effects.
1.6 ENVIRONMENTAL PROCEDURES
When a General Plan EIR has been certified for a project, the California Environmental Quality Act (CEQA) and the State CEQA Guidelines define standards and the procedure for additional environmental review. Sections 15162–15164 of the State CEQA Guidelines define the standards for determining the level of additional environmental review required when an EIR has been certified for a project.
1.0—Introduction
Meridian Consultants 4 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Pursuant to Section 15162 of the State CEQA Guidelines, when an EIR has been certified or a negative declaration adopted for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following:
2. Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
3. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the involvement of new significant environmental effects or a substantia l increase in the severity of previously identified significant effects; or
4. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following:
A) The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
B) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure o r alternative.
Under Section 15164 of the State CEQA Guidelines, when an EIR has been prepared and certified, and new information becomes available, it is appropriate to prepare an addendum to the EIR when only minor or technical additions or changes to an EIR are requir ed. The changes to the EIR are considered minor if the new information being addressed does not result either in the identification of any new significant impacts or a substantial increase in the severity of significant impacts previously identified in the EIR. A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included in an addendum to an EIR, the lead agency‘s findings on the project, or elsewhere in the record. The explanation must be supported by sub stantial evidence.
This Addendum to the certified EIR has been prepared because evaluation of the proposed project has not indicated any of the circumstances requiring a subsequent or supplemental EIR is required.
1.0—Introduction
Meridian Consultants 5 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
As demonstrated in Chapter 3, Environmental Analysis, of this Addendum, the proposed project would not result in new or more severe impacts than the approved project, and it would not trigger the need for preparation of a subsequent or supplemental EIR under the criteria in CEQA Guidelines Sections 15162(a) and 15163(a).
This Addendum demonstrates that no substantial changes are proposed to the approved project that would require major revisions to the certified EIR or substantially increase the severity of previously identified significant effects (see CEQA Guidelines Sec tion 15162[a][1]). Therefore, the impacts of the proposed project are within the levels and types of environmental impacts disclosed in the certified EIR.
As substantiated in Section 3 of this Addendum, the proposed project would not result in new significant impacts or substantially increase the severity of the impacts of the approved project due to substantial changes in circumstances since the certification of the EIR (see CEQA Gui delines Section 15162[a][2]).
In addition, no information that was not known and could not have been known at the time the General Plan EIR was certified has been revealed that shows new or substantially more severe significant impacts would result (see CEQA Guidelines Section 15162[a][3]). There are no new or considerably different mitigation measures that would substantially reduce one or more significant impacts of the approved project but that are not adopted.
Because this Addendum does not identify new or substantially more severe significant impacts, circulation for public review and comment is not necessary (CEQA Guidelines Section 15164[c]).
However, the City has considered this Addendum together with the pr eviously certified EIR prior to adoption of the proposed project, pursuant to CEQA Guidelines Section 15164(d).
1.7 CITY OF COLTON GENERAL PLAN (APPROVED
PROJECT)
1.7.1 Overview
The City of Colton incorporated in 2013 and the City Council adopted the City’s first locally prepared General Plan on May 2013. Prior to that time, the City was within the boundaries of San Bernardino County. The General Plan serves as the primary tool to guide the development and character of Colton.
The General Plan reflects consensus and compromise among citizens, businesses, and property owners. All cities and counties in California must prepare and adopt general plans and, per state law, they must include seven sections, or “elements:” Land Use, Housing, Circulation (Mobility), Noise,
1.0—Introduction
Meridian Consultants 6 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Safety, Open Space, and Conservation. The organization of these seven elements, and any optional elements, is determined by the local jurisdiction.
The elements contained in the City of Colton’s 2013 General Plan are:
• Air Quality
• Cultural Resources
• Housing
• Land Use
• Mobility
• Noise
• Open Space and Conservation
The General Plan expresses the Community’s values and broad consensus in the form of goals, policies, and programs. Goals are aspirational statements of intent that are not necessarily achievable within the 5- to 10-year planning period of this General Plan. Policies are statements that guide decision-making; they identify decisions the City must take to implement the General Plan and to make progress in achieving its goals. Programs are specific actions to be taken to carry out the General Plan’s intent.
1.7.2 Mobility Element
The Mobility Element guides the long -term circulation system of the City. Its goals and policies are designed to improve the local transportation system and create options for residents to move about the City. The Mobility Element balances the need for efficient traffic operations with the desire to maintain Colton as a safe and attractive community, with walkable neighborhoods, successful business districts, and distinctive streets. Policies within the Mobility and Land Use Elements shape the overall physi cal structure and form of Colton , so that key transportation corridors – such as Mount Vernon Avenue and Valley Boulevard – are able to accommodate new development and complement regional transportation while meeting local mobility needs.
The relevant section for the proposed Project including designating truck routes pursuant to AB 98 is Chapter: Goods Movement, Section: Truck Routes, available on page M -47 of the General Plan Mobility Element. The delivery of goods directly to and from Colton businesses is primarily provided by trucks on surface streets. Routes are designated based on the industrial districts served, access to freeways, industrial , and connector streets, and avoidance of residential neighborhoods. The following roadways serve as existing truck routes to support industrial business activity:
• Valley Boulevard
1.0—Introduction
Meridian Consultants 7 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Pepper Avenue
• Mount Vernon Avenue
• Colton Avenue
• Fairway Drive
• La Cadena Drive
• Rancho Avenue (south of Valley Boulevard)
• Washington Street
Designated truck routes are not included in the Mobility Element, as they may change over time to reflect changing land use patterns and to provide the best interests of businesses, truck drivers, and residential neighborhoods. When revising the designatio n of truck routes in Colton, as adopted by ordinance, routes must adhere to the following performance criteria:
1. Avoid unnecessary intrusions into residential neighborhoods to limit noise, vibration, and air quality impacts.
2. To the extent feasible, truck routes will not be provided on local streets and on streets with mostly residential frontage.
3. Truck routes must be located on roadways that provide direct and convenient access between Major Arterials and freeways (I -10 and I -215) and industrial and commercial businesses.
4. Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
1.7.3 Mobility Element Policies and Programs
The following Mobility Element policies and programs specifically apply to commercial trucks and routes.
Goals
Goal M-3: Develop a safe, efficient, and attractive street system that provides capacity to meet existing and future demand.
Goal M-5: Maintain an efficient network of goods and freight movement that supports the needs of Colton businesses while reducing truck and rail traffic impacts on residential neighborhoods.
Policies
1.0—Introduction
Meridian Consultants 8 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Policy M-3.2: Implement traffic-calming measures in Colton’s residential neighborhoods that are severely impacted by speeding, excessive vehicular volumes, truck traffic, and/or cut -through traffic. Use the City’s adopted traffic -calming policies to apply appropriate solutions.
Policy M-5.5: Vigorously enforce established truck routes to discourage truck shortcuts through residential neighborhoods.
Policy M-5.6: Ensure that the designated truck routes conform to the following performance criteria:
• Truck routes must avoid intrusions into residential neighborhoods to limit noise, vibration, and air quality impacts.
• To the extent feasible, truck routes will not be provided on local streets and on streets with mostly residential frontage.
• Truck routes must be located on roadways that provide direct and convenient access between Major Arterials and freeways (I -10 and I -215) and industrial and commercial businesses.
• Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
1.8 PRIOR ENVIRONMENTAL DOCUMENTATION: GENERAL
PLAN DRAFT EIR
The proposed Project is an amendment to the Mobility Element of the City of Colton General plan.
Therefore, this Addendum relies on the findings of the January 2013 Draft EIR and May 2013 Final EIR, and per CEQA Guidelines Section 15164, contains all the information necessary to ensure that the Addendum fully evaluates the proposed Project.
In accordance with CEQA Guidelines Section 15148 and 15150, this Addendum incorporates the 2013 Certified EIR (and its constituent parts) by reference. All documents incorporated by reference are available for review at the City of Colton, 659 N. La Cadena Drive, Colton, CA 92324.
A summary of the 2017 Certified EIR follows:
The City of Colton circulated the 2013 Draft EIR for a 45-day public review period. The EIR evaluated 17 topics in detail.
• Aesthetics
• Agriculture and Forestry Resources
1.0—Introduction
Meridian Consultants 9 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Air Quality
• Biological Resources
• Cultural Resources
• Geology and Soils
• Greenhouse Gas Emissions and Global Climate Change
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use and Planning
• Mineral Resources
• Noise
• Population and Housing
• Public Services
• Recreation
• Transportation and Traffic
• Utilities and Service Systems
All impacts of the Project were found to be less than significant with the implementation of the recommended mitigation measures except for the following:
• Air Quality (conflict with applicable air quality plan; violation of air quality standard or contribute substantially to air quality violation)
• Greenhouse Gas Emissions (long-term emissions; conflict with applicable plan, policy, or regulation)
• Recreation (existing parks and recreational facilities) • Transportation and Traffic (future level-of-service)
The City of Colton approved the General Plan and certified the General Plan Final EIR (State Clearinghouse No. 2012031037) on May 2013.
Meridian Consultants 0 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
2.0 PROJECT DESCRIPTION
2.1 PROJECT LOCATION
The proposed Project is located throughout most of the City of Colton, as it includes certain streets that large trucks (e.g., Big Rigs , Tractor-Trailers, or 18-wheelers) are authorized to drive on as they access locations that they deliver their goods to within the City.
The Project boundary is the same as the City’s Municipal Boundary as truck operations are mobile.
The City’s Municipal Boundary is shown in Figure 1: City of Colton Boundary, below.
2.2 PROJECT BACKGROUND
The proposed project for this Addendum is an amendment to the City of Colton General Plan’s Mobility Element. The amendment is required to comply with Assembly Bill 98 (AB 98, revised SB 415) namely to establish designated truck routes where properties fronting these roads at least 50 percent commercial and industrial, thereby lim iting sensitive receptors (i.e. residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes. The City’s existing truck routes are shown in Figure 2: Truck Routes Existing Conditions, below. The proposed truck routes, along with proposed General Plan Mobility text and policy updates represent the proposed project.
2.0—Project Description
Meridian Consultants 1 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 1 CITY OF COLTON BOUNDARY
2.0—Project Description
Meridian Consultants 2 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 2 TRUCK ROUTES EXISTING CONDITIONS
2.0—Project Description
Meridian Consultants 3 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
2.3 PROJECT CHARACTERISTICS
The proposed project for this Addendum is an amendment to the City of Colton General Plan’s Mobility Element. The amendment is required to comply with Assembly Bill 98 (AB 98, revised SB 415) namely to establish designated truck routes where properties fronting these roads at least 50 percent commercial and industrial, thereby lim iting sensitive receptors (i.e. , residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes.
The City of Colton’s (City) proposes a General Plan Amendment to update the 2013 Mobility Update to comply with Assembly Bill 98 (AB 98), which was signed by the Governor on September 30, 2024.
Subsequently, the Legislat ure passed Senate Bill 415 (SB 415) , legislation intended to clarify the regulations set forth in AB 98. SB 415 was signed by the Governor on October 3, 2025.
AB 98 and SB 415 add regulations for warehouse logistics developments that primarily handle, store, and distribute goods and these regulations must be implemented no later than January 1, 2026. As stated in Government Code Subsections 65098.1 (a)(4) and (5), (b)(4) and (5), (c)(4) and (5), and (d)(2) and (7), applicable new or expanded logistics use developments must implement the following:
• Have a separate entrance to the logistics use development or logistics park for heavy -duty trucks accessible via a truck route, arterial road, major thoroughfare, or a local road that predominantly serves commercial, agricultural, or industrial uses. A sep arate entrance for heavy-duty trucks may include a driveway with a lane dedicated to heavy -duty trucks and a lane dedicated for other vehicles.
• Locate truck entry, exit, and internal circulation away from sensitive receptors. Heavy -duty diesel truck drive aisles shall be prohibited from being used on sides of the building that are directly adjacent to a sensitive receptor property line.
In addition, Government Code Section 65098.1 establishes the deadline for complying with truck route requirements and Section 65302.02 provides specifications for designating truck routes. The City proposes to update the Mobility Element of the General Plan and amend Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal Code to ensure that any future or in - process applications for logistic use development, comply with these provisions of AB 98 and SB 415. To facilitate these updates t he City of Colton (City) proposes a General Plan Amendment to update the 2013 Mobility Element and the 2016 Truck Route Plan. The City has determined that an EIR Addendum (Addendum) is the appropriate environmental document to comply with the California Environmental Quality Act (CEQA). This is herein further known as the “Project”.
The EIR Addendum will supplement the City of Colton General Plan EIR (State Clearinghouse #2012031037). This EIR Addendum focuses on providing additional information and analysis necessary to address proposed changes within the Mobility Element of the General Plan Update and the amendment of Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal
2.0—Project Description
Meridian Consultants 4 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Code as to transportation diagrams and typical street cross sections included in the Truck Route Plan.
2.3.1 General Plan
The following text changes to the General Plan Mobility Element are proposed to better align with AB 98/SB 415 requirements. The proposed edits are shown in strike through text for deletions and double underlined text for additions.
General Plan Text Revisions
Recommended Changes to Page M-47 of the 2013 Mobility Element:
Truck Routes
The delivery of goods directly to and from Colton businesses is primarily provided by trucks on surface streets. The State of California Vehicle Code has established regulations on the use of local roads by trucks and other heavy vehicles. To protect residential neighborhoods from the impacts of the high volumes truck traffic, certain streets have been designated as truck routes by local ordinance. The City strives to connect local truck routes with other cities’ truck routes to form an integrated regional network for the movement of goods.
Routes are designated based on the industrial districts served, access to freeways, industrial, and connector streets, and avoidance of residential neighborhoods. Identifying truck routes is important not just to preserve dedicated routes to serve industrial districts and reduce land use conflicts, but also to allow for proper street construction and maintenance, given that heavy truck traffic impacts physical street conditions more quickly than automobile traffic.
Truck routes are listed below and shown on Figure M-8.1. will continue to be defined by ordinance via the Municipal Code and will require City Council approval for modification. Truck routes are subject to change based on vehicular traffic, changes to surrounding city truck routes, enforcement, and trucking demand through Colton. Modification to designated truck routes will require a General Plan Amendment to the Mobility Element and an update and dissemination of a new GIS truck map.
The specified portions of the following public streets are hereby designated as "Truck Routes. " Truck Routes. These truck routes provide access to businesses within and adjacent to the City.
1. Mt. Vernon Avenue (Washington Street to North City Limits)
2. Colton Avenue (Mt. Vernon Avenue to East City Limits)
3. Fairway Drive (Mt. Vernon Avenue to East City Limits)
2.0—Project Description
Meridian Consultants 5 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
4. Valley Boulevard (within Colton City Limits between Pepper Avenue and western City limit and between Rancho Avenue and its eastern terminus at Sperry Drive)
5. Pepper Avenue (within Colton City Limits)
6. La Cadena Drive (Valley Boulevard to South City Limits)
7. Agua Mansa Road (West City limits to Rancho Avenue)
8. 10. Riverside Avenue (within Colton City Limits)
9. 11. Iowa Avenue (La Cadena Drive to South City Limits)
10. 12. M Street (La Cadena Drive to Mt. Vernon Avenue)
12. 13. Barton Road (within Colton City Limits between La Cadena Drive and I-215)
13. 14. Washington Street (Mt. Vernon Avenue to East City Limits I-215)
14. 15. Hunts Lane (Washington Street Commercial Road to North City Limits)
15. 16. Rancho Avenue (La Cadena Drive to Valley Boulevard) The specified portions of the following public streets are hereby designated as “Local Truck Routes” .
Local truck routes provide access to businesses that require use of local roadways to access existing industrial uses. Local Truck Routes:
1. M Street (La Cadena Drive to Mt. Vernon Avenue)
2. Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive)
3. Laurel Street (Pennsylvania Avenue to La Cadena Drive)
4. La Cadena Drive (Laurel Street to Mt. Vernon Avenue)
5. Cooley Drive (Mt. Vernon Avenue to 514 feet north of Valleywood Street)
6. Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street)
7. Congress Street (Fogg Street to 8th Street)
8. 8th Street (Congress Street to Fogg Street)
Proposed Changes to Page M-56 of the 2013 General Plan Mobility Element Goods Movement
2.0—Project Description
Meridian Consultants 6 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
The efficient movement of goods and freight support the economic success of the City and local and regional businesses. The transportation system needs to respond to the needs of businesses to easily access regional routes and access local commercial and industrial business. The designation of truck routes and maintained rail lines and spurs are central to these needs.
Goal M-5: Maintain an efficient network of goods and freight movement that supports the needs of Colton businesses while reducing truck and rail traffic impacts on residential neighborhoods.
Policy M‐5.1: Work with railroad operators to limit the aesthetic, noise, vibration, traffic congestion, and air quality impacts of new projects on residential neighborhoods adjacent to railroad lines and railroad projects.
Policy M-5.2: Ensure that Colton Crossing design, construction activities, maintenance, and railroad operations do not create negative adverse impacts to surrounding residential properties.
Policy M-5.3: Maintain the Railroad Quiet Zones through Colton to limit locomotive horn blowing adjacent to residential neighborhoods.
Policy M-5.4: Support the abandonment or the realignment of railroad spurs that no longer serve industrial ‐support services and that create pedestrian safety conditions.
Policy M-5.5: Vigorously enforce established truck routes to discourage truck shortcuts through residential neighborhoods and study the feasibility of new alternative routes that avoid sensitive receptors. Designate Truck Routes in coordination with adjacent jurisdictions to accommodate the safe and efficient movement of trucks to truck -served uses. Establish Local Truck Rout es that permit access to local businesses only and prohibit through truck traffic.
Policy M-5.6: The City shall establish and maintain specific truck routes for the transport of goods, materials, or freight for storage, transfer, or redistribution to safely accommodate additional truck traffic and avoid residential areas and sensitive receptors, as de fined by Section 65098 of the California Government Code as follows: Truck routes shall maximize the use of interstate or state divided highways as preferred routes for truck routes and maximize use of arterial roads, major thoroughfares, and local roads that predominantly serve commercial or industrial uses when state or interstate highways are not utilized.
2.0—Project Description
Meridian Consultants 7 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Major or minor collector streets and local roads that predominantly serve commercial or industrial uses shall be used for truck routes only when strictly necessary to reach existing industrial uses. Truck routes shall be designated on streets that minimize exposure to sensitive receptors, including residential areas, schools, public parks, and hospitals. • Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
• The City shall install conspicuous signage to identify truck routes and additional signage for truck parking and appropriate locations for idling and parking.
• The City shall engage all economic segments of the community when changes or modifications to the City’s designated truck routes are being considered.
• The City shall maintain a GIS map of the designated truck routes and share the information with appropriate users.
Ensure that the designated truck routes conform to the following performance criteria:
• Truck routes must avoid intrusions into residential neighborhoods to limit noise, vibration, and air quality impacts.
• To the extent feasible, truck routes will not be provided on local streets and on streets with mostly residential frontage.
• Truck routes must be located on roadways that provide direct and convenient access between Major Arterials and freeways (I‐10 and I‐215) and industrial and commercial businesses.
• Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
2.3.2 Municipal Code
The City proposes to amend Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal Code. The following text changes to Title 10 of the Colton Municipal Code are proposed to better align with AB 98/SB 415 requirements. The proposed edits are shown in strike through text for deletions and double underlined text for additions.
2.0—Project Description
Meridian Consultants 8 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Municipal Code Text Revisions
Recommended Changes to Title 10 of the Colton Municipal Code:
Title 10 - VEHICLES AND TRAFFIC
Chapter 10.60 DESIGNATED TRUCK ROUTES
10.60.010 Title.
This Chapter shall be known as the Truck Route Ordinance. The City of Colton hereinafter shall be called "City. " This Chapter shall be applicable in the incorporated territory of the City. (Ord. No. O-20-16, § 1, 10-18-2016)
10.60.020 Designated.
A. The use of all streets within the City by any vehicle exceeding a gross weight of six fourteen thousand pounds, except upon the Truck Routes specified in the City of Colton General Plan Mobility Element Section 10.60.020(B) is prohibited. A vehicle in excess of six fourteen thousand pounds up to a maximum of fourteen thousand eighty thousand pounds, including its load, may utilize the streets and portions of streets designated as Truck Routes. Except as otherwise provided in Section 21101 et seq. and Sectio n 35701 et seq. of the California Vehicle Code, no vehicle in excess of fourteen eighty thousand pounds, including its load, shall utilize the streets and portions of streets designated as Truck Routes. Streets designated as Local Truck Routes in the City of Colton General Plan Mobility Element shall only be used by local businesses. Through truck traffic is not permitted on Local Truck Routes.
B. The specified portions of the following public streets are hereby designated as "Truck Routes. "
1. Mt. Vernon Avenue (Washington Street to North City Limits)
2. Laurel Street (Pennsylvania Avenue to La Cadena Drive)
3. La Cadena Drive (Laurel Street to Mt. Vernon Avenue)
4. Colton Avenue (Mt. Vernon Avenue to East City Limits)
5. Fairway Drive (Mt. Vernon Avenue to East City Limits)
2.0—Project Description
Meridian Consultants 9 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
6. Valley Boulevard (within Colton City Limits between Pepper Avenue and western City limit and between Rancho Avenue and its eastern terminus at Sperry Drive)
7. Pepper Avenue (within Colton City Limits)
8. La Cadena Drive (Valley Boulevard to South City Limits)
9. Agua Mansa Road (West City limits to Rancho Avenue)
10. Riverside Avenue (within Colton City Limits)
11. Iowa Avenue (La Cadena Drive to South City Limits)
12. M Street (La Cadena Drive to Mt. Vernon Avenue)
13. Barton Road (within Colton City Limitsbetween La Cadena Drive and I-215)
14. Washington Street (Mt. Vernon Avenue to East City LimitsI-215)
15. Hunts Lane (Washington Street Commercial Road to North City Limits)
16. Rancho Avenue (La Cadena Drive to Agua Mansa Road)
CB. The following street segment is proposed for restrictions to allow only trucks with a kingpin- to-rear-axle (KPRA) length of twenty-six feet or less:
1. Rancho Avenue (Valley Boulevard to Agua Mansa Road)
(Ord. No. O-20-16, § 1, 10-18-2016)
2.0—Project Description
Meridian Consultants 10 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 3 PROPOSED TRUCK ROUTE REMOVALS
2.0—Project Description
Meridian Consultants 11 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 4 PROPOSED TRUCK ROUTES PLAN
2.0—Project Description
Meridian Consultants 12 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 5 PROPOSED TRUCK ROUTE PLAN AND LAND USE MAP
Meridian Consultants 23 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
3.0 ENVIRONMENTAL ANALYSIS
3.1 APPROACH
This section summarizes the conclusions of the certified EIR and then evaluates whether the proposed project would meet the conditions described in CEQA Guidelines Section 15164 for preparation of an Addendum. The net change in environmental impacts for th e approved Project (buildout of the City in accordance with the adopted General Plan including the Mobility Element) in comparison to future conditions of the City upon implementation of the proposed Project (Mobility Element Amendment) are assessed. The a pproach to this section considers the limited topics that the proposed Project could impact. The proposed project:
• Would not alter any land use designations and therefore not permit any new land uses in comparison to the existing General Plan.
• Is limited to designating truck routes and assigning weight restrictions for some roadways and modifying applicable policies and implementation actions.
A primary objective of AB 98/SB 415 is to minimize the environmental impact of logistic facilities on surrounding communities, and in particular to sensitive receptors (residential, schools, daycare, etc.). As described in Section 2.0, Project Description, the approach reviewing truck routes focused on identifying potential roadways adjacent to residential and other sensitive receptors, that currently carry truck traffic, or are anticipated to accommodate future, area-wide growth in truck volumes. The team then considered the potential to divert these truck volumes to less sensitive roadways. If appropriately designed and implemented, the truck route designations would result in beneficial impacts to operational impacts including air quality (including health risk), and noise.
3.2 ENVIRONMENTAL TOPICS DETERMINED TO HAVE “NO
IMPACT”
Implementation of the Mobility Element Amendment would not result in direct, or reasonably foreseeable indirect, physical changes to the built environment or any ground disturbance that could impact environmental resources. The proposed Project would remove existing 2016 City Truck Routes on four (4) roadways, reclassify four (4) routes from a City Truck Route to a Local Truck Route, and designate four (4) additional routes as Local Truck Routes. The proposed update to the City’s truck route designations reflects current truck activity and access to truck -generating uses while minimizing trucks on roadways with sensitive receptors. It would not involve any proposed changes such as the re-classification of arterial, collector or other road types, or right-of-way modifications.
As such, there would be no potential for impacts to any of the following resources:
• Aesthetics
Meridian Consultants 24 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Agriculture and Forestry Resources
• Biological Resources
• Cultural Resources
• Geology and Soils
• Hydrology and Water Quality
• Mineral Resources
• Population and Housing
• Public Services
• Recreation
• Tribal Cultural Resources
• Utilities and Service Systems
• Wildfire
3.3 ENVIRONMENTAL TOPICS DETERMINED TO HAVE
“LESS THAN SIGNIFICANT IMPACT”
• Hazard or Hazardous Materials
Implementation of the Mobility Element would not result in potential significant Hazard or Hazardous Materials-related impacts. The City’s 2016 Truck Route Master Plan identifies higher capacity roadways that can accommodate truck traffic and separate it from residential areas.
Currently, residential development is located along all designated truck routes. The updated City Truck Routes’ reclassification of routes from a City Truck Route to a Local Truck Route would create designated local routes for trucks to access commercial businesses and reduce neighborhood cut- through truck traffic. Thus, the risks associated with routine transport of hazardous materials may be reduced in comparison to the existing Mobility Element. Further, the General Plan contains Policy M-
5.5, which enforces established truck routes and Policy M-5.6, which establishes truck routing performance standards. Adherence to these performance standards ensures that transport of hazardous materials is routed away from residential neighborhoods to the maximum extent possible.
The Project proposes to update the General Plan Mobility Element Policy M -5.5 and Policy M-5.6 to reflect recent updates to California Government Code Sections 65098 and 65302 , which would,
Meridian Consultants 25 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
ensure that federal and state regulations continue to govern the transport, use, and disposal of hazardous materials. Accordingly, potential impacts would be less than significant.
3.4 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
Given the characteristics of the project, therefore, the following environmental analysis focuses on the following environmental topics:
• Air Quality
• Greenhouse Gas Emissions
• Land Use and Planning
• Noise
• Transportation
These topics are reviewed relative to the General Plan land uses designations within the City as well as existing, specific sensitive receptors. Whether or not the General Plan land use designation for a parcel is consistent with the existing use, the designations represent the anticipated long-term land use for each parcel. Since this Addendum analyzes the long-term potential impact of the Project and designated truck routes in comparison to buildout conditions for the existing General Plan, the land use designations are an appropriate basis for this impact analysis.
The following section is formatted to address the CEQA Appendix G checklist for the four topics listed above. A summary of the impact conclusions under the General Plan EIR for each category is also provided, along with a list of any relevant mitigation me asures included in the General Plan EIR for the respective impact.
3.5 AIR QUALITY
3.5.1 Summary of Impacts Identified in the 2013 Gener al Plan EIR
The Air Quality section of the General Plan Draft EIR concluded that the following impacts would be significant and unavoidable even with implementation of General Plan policies. No feasible mitigation measures were identified:
• Air Quality Management Plan (AQMP) Consistency: As a policy document, no development is authorized or would directly occur from the General Plan Update, however development would occur within the planning area as guided by the policies of the General
Meridian Consultants 26 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Plan Update. It was estimated that emissions resulting from buildout under the General Plan Update would exceed South Coast Air Quality Management District (SCAQMD) daily operational thresholds after the first year of growth, and emissions would continue to increase proportionally as growth occurs long -term in the City. While the SCAQMD daily thresholds are not intended to be applied to the program -level; however, they do provide a guidepost for comparing incremental increases in emissions guided by the pro gram.
Additionally, the projected population growth is not completely accommodated by the capacity of the proposed General Plan, while the projected employment growth is accommodated. Therefore, the proposed General Plan is inconsistent with the growth projections used in the RTP/SCS and would be inconsistent with the 2012 AQMP.
• Long Term Operational Related Emissions : The projected long -term net increase in emissions associated with operations under the General Plan Update would exceed the SCAQMD thresholds and therefore, mitigation measures required by SCAQMD should be implemented to the greatest extent possible. The Project emissions with the recommended mitigation measures would be reduced to an extent. However, due to the General Plan’s inconsistency with the Southern California Association of Government’s (SCAG) population growth projections for the City, the potential still remains for an interference with the implementation of the AQMP. Thus, long -term impacts to air quality remain potentially significant and unavoidable.
The Air Quality section of the General Plan Draft EIR concluded that the following impacts would be less than significant with mitigation:
• Short-Term Construction Related E missions: As a policy document, no development is authorized or would directly occur from the adoption of the General Plan Update, however development would occur within the planning area as guided by the policies of the General Plan Update. Short-term criteria pollutant emissions w ould occur during site preparation, grading, building construction, paving, and painting/coating activities. Emissions would occur from use of construction equipment, worker, vendor, and hauling trips, and disturbance of on -site soils (fugitive dust). Short-term air quality impacts would be determined on a project-by-project basis; if significant, then mitigation measures would be required by SCAQMD Rules to reduce construction emissions and to be implemented on an individual basis.
• Carbon Monoxide (CO) Hot Spots: CO hotspots are typically associated with intersections with lower ratings of Level of Services (LOS), such as LOS E or F, which indicate high congestion and high amounts of idling vehicles that have the potential to generate a CO hotspot. There is one intersection within the City currently operating at LOS E, and there are 17 intersections within the City that are anticipated to operate at LOS E or F in either or both
Meridian Consultants 27 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
of the morning or evening peak hours without implementation of recommended circulation system improvements. Pursuant to General Plan policies, future development projects would be screened and analyzed pursuant to the CO Protocol to determine if a CO hotspot may occur at congested intersections. Mitigation may be required, if necessary, to alleviate traffic congestion and minimize the hotspot potential. With implementation of the proposed General Plan Update policies to require air quality analyses and traffic Level of Service (LOS) requirements, impacts related to carbon monoxide hotspots would be less than significant.
The Air Quality section of the General Plan Draft EIR concluded that the following impacts would be less than significant with the implementation of General Plan policies and the application of standard development practices without mitigation:
• Sensitive Receptors: Emissions from future development projects would have the potential to expose sensitive receptors to temporary, localized pollutant concentrations in excess of air quality standards. General Plan policies would require preparation of an air quality impact analysis for individual development projects where possible emissions could impact sensitive receptors, and such analysis would include project -specific mitigation measures, as appropriate. Furthermore, future construction activities w ould be subject to routine control measures as required by SCAQMD as well as guidelines set forth by the California Air Resources Board (CARB). With the implementation of General Plan Policies and existing regulations, impacts would not be significant.
• Toxic Air Contaminants: The General Plan land use plan includes an Industrial Park (IP), Light Industrial (LI), and Heavy Industrial (HI) land use categories that permit varying degrees of manufacturing, processing, and distribution activities. Future businesses of these types that may be developed within the designated industrial areas could result in emissions of a variety of toxic air contaminants. CARB has developed guidelines to assist local government agencies in siting new land uses that could be oc cupied by “sensitive individuals” at a safe distance from such sources. General Plan policies for future development includes preparation of air quality analysis, which would include health risk assessments where appropriate, which would address any potential impact that could occur in the City. With implementation of proposed General Plan programs and existing regulations that regulate and monitor toxic emitters, potential health impacts to sensitive receptors due to exposure to toxic air contaminants would be less than significant.
• Odors: There are multiple existing potential sources of odors within the City, including two wastewater treatment facilities, crematoriums, as well as light and heavy industrial uses.
Future development within the area of these and other potential odor sources would have to consider potential impacts individually. Pursuant to General Plan policies, future
Meridian Consultants 28 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
development would be evaluated in regards to potential impacts related to odors. While siting is the primary mitigation to prevent exposure to odors, odors can also be mitigated in similar fashion to air pollutant emissions (i.e. filtering). Impacts related to odors w ould be less than significant with implementation of the proposed General Plan policies.
3.5.2 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Conflict with or obstruct implementation of the applicable air quality plan? b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or State ambient air quality standard?
c) Expose sensitive receptors to substantial pollutant concentrations? d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
3.5.3 Environmental Impacts
a) Conflict with or obstruct implementation of the applicable air quality plan? No Impact. The Project proposes to remove existing 2016 City Truck Routes on four (4) roadways:
Valley Boulevard (between Pepper Avenue and western City limit), Barton Road (between La Cadena Drive and I-215), Washington Street (Mt. Vernon Avenue to I-215), and Hunts Lane (Commercial Road to North City Limits) . The Project also proposes the reclassification of four (4) routes, M Street (La Cadena Drive to Mt. Vernon Avenue), Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive), Laurel Street (Pennsylvania Avenue to La Cadena Drive), and La Cadena Drive (Laurel Street to Mt. Vernon Avenue) from a C ity Truck Route to a Local Truck Route. The reclassification would restrict truck access to only trucks accessing local commercial businesses and reduce neighborhood cut-through truck traffic. Trucks currently using reclassified Local Truck Routes as cut-through to other jurisdictions would instead remain on the freeways (I-10 and I-215) to reach their destination. The Project also designates four ( 4) additional road segments as Local Truck Routes, Cooley Drive (Mt. Vernon Avenue to the driveway north of V alleywood Street), Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street), Congress Street (Fogg Street to 8th Street), and 8th Street (Congress Street to Fogg Street). The Local Truck Route designation at the four (4) new road segments formalizes truck movements already occurring to access existing local commercial businesses. Count data was collected to confirm existing truck activity. At Cooley Drive east of Mt. Vernon Avenue 414 heavy-duty trucks were recorded. The Fogg Street, Congress Street, and 8 th Street Local Truck Routes are connected, representing one corridor for commercial businesses with 208 heavy-duty trucks were recorded accessing this corridor at Fogg Street south of M Street. Trucks currently rely on these routes; the Local Truck Route designation does not create new truck demand and ensures that trucks continue to operate only on these routes to access their
Meridian Consultants 29 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
businesses rather than dispersing and cutting through on nearby neighborhood streets where children are frequently present.
The proposed Project would not result in any land use or policy changes that would result in new development or population or employment growth beyond what was projected in the City’s General Plan. The Project would not change absolute number of truck trips. The Project would reroute existing truck trips or formalize routes already containing truck traffic . This change is anticipated to result in up to 50 trucks trips a day being rerouted from a roadway with more sensitive receptors to any City Truck Route with fewer sensitive receptors, including heavy truck trips. The proposed project would not alter the significant and unavoidable impacts identified in the General Plan EIR. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or State ambient air quality standard?
No Impact. As summarized above, the proposed Project would not result in any land use or policy changes that would result in new development or population or employment growth beyond what was projected in the City’s General Plan. Similarly , the proposed Project would remove existing 2016 City Truck Routes on four (4) roadways, reclassify four (4) routes from a City Truck Route to a Local Truck Route , and designate four (4) additional routes as Local Truck Routes . Trucks currently using reclassified Local Truck Routes as cut-through to other jurisdictions would instead remain on the freeways (I-10 and I-215) to reach their destination. Newly designated Local Truck Routes are currently used by trucks to access local commercial businesses. The Project would not change absolute number of truck trips. The Project would reroute existing truck trips or formalize routes already containing truck traffic and would not result in the generation of additional vehicle trips, including heavy truck trips. As a result, there would be no increase of any criteria pollutant emissions The implementation of the proposed project would not increase or alter criteria pollutant emissions. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
c) Expose sensitive receptors to substantial pollutant concentrations? No Impact. The General Plan EIR concluded that implementation of proposed policies and programs would provide sufficient protection for sensitive receptors. As summarized above, t he proposed Project would remove existing 2016 City Truck Routes on four (4) roadways, reclassify four (4) routes from a City Truck Route to a Local Truck Route, and designate four (4) additional routes as Local Truck Routes. The Project would reroute existing truck trips or formalize routes already containing truck traffic and would not result in the generation of additional vehicle trips, including heavy truck trips.
Meridian Consultants 30 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Trucks currently using reclassified Local Truck Routes as cut-through to other jurisdictions would instead remain on the freeways (I-10 and I-215) to reach their destination. Newly designated Local Truck Routes are currently used by trucks to access local commercial businesses. Consistent with AB 98, the proposed Project would not introduce additional exposure and limit sensitive receptors (i.e. residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes. The Project would not change absolute number of truck trips. The rerouted trucks would not result in an increase of over 50 trucks trips being rerouted to any City Truck Route. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people
No Impact. The proposed project does not include any direct or reasonably foreseeable indirect physical changes to the environment or development of any new uses. The Project would reroute existing truck trips and would not result in the generation of additional vehicle trips, including heavy truck trips. The Project would not change absolute number of truck trips. The rerouted trucks would not result in an increase of over 50 trucks trips being rerouted to any City Truck Route .
There would be no construction activities that could result in odor impacts, and operational changes to truck traffic would not result in new odor generation. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
3.5.4 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR did not identify any Air Quality mitigation measures.
3.6 GREENHOUSE GAS EMISSIONS
3.6.1 Summary of Impacts Identified in the 2013 General Plan EIR
The Greenhouse Gas section of the General Plan Draft EIR concluded that the following impacts would be significant and unavoidable even with implementation of General Plan policies. No feasible mitigation measures were identified:
• Long Term Operational Related Emissions: The projected long-term net increase in greenhouse gas (GHG) emissions from future development projects would result in GHG emissions from mobile, area, and operation sources. New development in the planning area guided by the proposed General Plan Update would generate approximately 24,502 metric tons of carbon dioxide equivalent (MTCO2e) after the first year of growth and would increase additively as growth occurs over the long term. This volume of GHG emissions would exceed
Meridian Consultants 31 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
the SCAQMD interim threshold. It should be noted that the interim thresholds are not intended to be applied to the program -level, however as discussed below, the General Plan Update would be inconsistent with the CARB Scoping Plan and the Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) based on SCAG’s growth projections. • Greenhouse Gas Reduction Plans: The proposed General Plan Update supports four of the action categories, in the CARB Scoping Plan, through energy efficiency, green building, recycling/waste, and water conservation through its policies. The proposed General Plan Update would directly support the implementation of the RTP/SCS in achieving mandated GHG reduction targets through its policies. However, t he General Plan Update is not consistent with the population growth forecasts of the RTP/SCS because it does not provide the capacity for residential development to accommodate the projected population growth.
This inability to accommodate the projected population growth would indirectly generate growth elsewhere in the region and thus could potentially alter transportation plans and models of the RTP/SCS determined to achieve the noted GHG reduction targets.
The Greenhouse Gas of the General Plan Draft EIR concluded that the following impacts would be less than significant with the implementation of General Plan policies and the application of standard development practices without mitigation:
• Short-Term Construction Related Emissions: As a policy document, no development is authorized or would directly occur from the General Plan Update, however development would occur within the planning area as guided by the policies of the General Plan Update.
Construction activities are short -term and cease to emit greenhouse gases upon completion, unlike operational emissions that are continuous year after year until operation of the use ceases. General Plan policies require analysis of GHG emissions and po tential climate change impacts for future development projects.
3.6.2 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment.
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases.
3.6.3 Environmental Impacts
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment.
Meridian Consultants 32 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
No Impact. The Project proposes to remove existing 2016 City Truck Routes on four (4) roadways:
Valley Boulevard (between Pepper Avenue and western City limit), Barton Road (between La Cadena Drive and I-215), Washington Street (Mt. Vernon Avenue to I-215), and Hunts Lane (Commercial Road to North City Limits). The Project also proposes the reclassification of four (4) routes, M Street (La Cadena Drive to Mt. Vernon Avenue), Laurel Street (Pennsylvania Avenue to La Cadena Drive), and La Cadena Drive (Laurel Street to Mt. Vernon Avenue), and Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive) from a City Truck Route to a Local Truck Route. The reclassification would restrict truck access to only trucks accessing local commercial businesses and reduce neighborhood cut-through truck traffic. The Project also designates four (4) additional road segments as Local Truck Routes, Cooley Drive (Mt. Vernon Avenue to the driveway north of Valleywood Street), Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street) , Congress Street (Fogg Street to 8 th Street), and 8th Street (Congress Street to Fogg Street) . Count data recorded 414 heavy-duty trucks currently using Cooley Drive and 208 heavy-duty trucks using the Fogg Street/Congress Street/8th Street corridor. The Local Truck Route designation allows local trucks to continue to operate only on these routes to access their businesses rather than dispersing and cutting-through on nearby neighborhood streets where children are frequently present. The Project would not change absolute number of truck trips. The Project would not alter land uses and would not result in an increase of over 50 trucks trips being rerouted to any City Truck Route, including heavy truck trips, which could generate additional GHG emissions. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project. b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases.
No Impact. As summarized above, t he proposed Project would reroute existing truck trips or formalize routes already containing truck traffic and would not result in an increase of over 50 trucks trips for any City Truck Route, including heavy truck trips, and would not result in any land use or policy changes that would result in new development or population or employment growth beyond what was projected in the City’s General Plan . No change in the level of significance, identified in the Certified EIR, would occur through operation of the proposed Project.
3.6.4 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR did not identify any Greenhouse Gas mitigation measures.
3.7 LAND USE & PLANNING
Summary of Impacts Identified in the 2013 General Plan EIR All of the potential Land Use and Planning impacts were determined to be Less Than Significant upon implementation of General Plan policies without Mitigation.
Meridian Consultants 33 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Physically Divide an Established Community: According to the 2013 General Plan EIR, the proposed Circulation Element would not establish any new transportation routes or facilities.
No other types of major corridors are planned that would require clearing of existing land uses. The proposed General Plan supports maintenance of established neighborhoods through the General Plan Land Use (LU) Policies, including Policy LU-1.6, LU-1.9, LU-6.1, LU-
6.2, LU-6.3, LU-6.4, and LU-6.5. With the implementation of the proposed LU policies , no impact would occur.
• Conflict with Applicable Land Use Plans, Policies, or Regulations: According to the 2013 General Plan EIR, the planning area is subject to a variety of federal, State and locally adopted plans designated to mitigate environmental impacts and preserve important resources. The 2013 General Plan EIR concluded that applicable land use plans, policies, and regulations would have a less than significant impact.
• Conflict with Any Applicable Habitat or Natural Community Conservation Plan: The 2013 General Plan EIR identified that portions of the City are located within Recovery Units of the adopted Delhi -Sands Flower -Loving Fly Recovery Plan . The City is not within any other adopted habitat conservation plan or natural community conservation plan. As discussed in the 2013 General Plan EIR’s Biological Resources section, t he Recovery Units of the Delhi - Sands Flower-Loving Fly Recovery Plan is designated as open space. Thus, it supports the objectives of the plan, and would have no effect upon the plan.
3.7.1 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Physically divide an established community?
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
3.7.2 Environmental Impacts
a) Physically divide an established community?
No Impact. As described above, the updated City Truck Routes’ reclassification of routes from a City Truck Route to a Local Truck Route would create designated local routes for trucks which maintain access to commercial businesses and reduce neighborhood cut-through truck traffic. The introduction of additional Local Truck Routes formally establishes routes trucks already use d to access local businesses while reducing surrounding neighborhood cut-through truck traffic on roadways where children are frequent ly present. The Project’s reclassification and designation of Local Truck Routes would not physically divide an established community. The Project’s reduction of neighborhood cut-through truck tr affic would improve the surrounding residential areas.
Meridian Consultants 34 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Furthermore, the Project proposes to update the General Plan Mobility Element Policy M -5.5 and Policy M -5.6, which would improve residential neighborhood conditions. Policy M-5.5 enforces established truck routes, in order to discourage truck shortcuts through residential neighborhoods.
Policy M -5.6 includes performance criteria for designated truck routes , which includes avoiding intrusions into residential neighborhoods. Thus, implementation of the Project would not physically divide an established community and would improve residential areas with compliance to AB 98 and SB 415. No impact would occur.
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
No Impact. The Project would not conflict with any land use plan, policy or regulation adopted for the purpose of mitigating an environmental impact. As described above, the Project proposes to update the Mobility Element of the General Plan and amend Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal Code in order to comply with AB 98/ SB 415. The Project’s reclassification of routes, designation of additional Local Truck Routes, and General Plan Mobility Element updates would minimize environmental impacts to local communities. The Local Truck Routes are aimed at reducing neighborhood cut-through truck traffic while maintaining truck access to local commercial businesses. The Project proposes to update the General Plan Mobility Element Policy M -5.5 and Policy M -5.6 to reflect recent updates to California Government Code Sections 65098 and 65302. Implementation of the Project would ensure compliance with AB 98 and SB 415 and would not conflict with any land use plans, policies or re gulations. No impact would occur.
3.7.3 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR did not include any Land Use and Planning mitigation measures.
3.8 NOISE AND VIBRATION
3.8.1 Summary of Impacts Identified in the 2013 General Plan EIR
The Nosie section of the General Plan Draft EIR concluded that the following impacts would be Less Than Significant upon implementation of General Plan policies without Mitigation. • Construction Noise: As a policy document, no development is authorized or would directly occur from the adoption of the General Plan Update, however development that would occur within the planning area as guided by the policies of the General Plan Update. Grading,
Meridian Consultants 35 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
paving, landscaping and building construction processes involve equipment and vehicles that are known to produce intrusive levels of noise. This would result in temporary increase in local noise levels near the active construction sites that could adversely affect neighboring land uses, particularly those where sensitive receptors are located. Continuing enforcement of the Municipal Code would reduce potential nuisance noise impacts. • Traffic Noise: Future population and employment growth within the planning area would result in increased traffic and the need for roadway and intersection improvements necessary to maintain desired levels of service. Increases in traffic could result in permanent increases in ambient noise levels, e.g., where a roadway segment is proposed to be expanded with additional travel lanes over the long-term to achieve level of service standards. Roadway noise could also increase on an existing roadway that would carry increasing traffic volumes.
In either set of circumstances, roadway noise levels could increase to beyond the levels considered acceptable for the adjacent land uses as defined by the City of Colton Noise Guidelines. Potential increases in noise levels along existing and proposed roadways would be assessed in conjunction with the City’s review of site-specific noise impact analyses. • Vibration: Development that would occur within the planning area as guided by the policies of the General Plan Update has the potential to generate perceptible vibration levels to sensitive receptors within 20 feet from the operation of heavy equipment. The proposed General Plan Update does not authorize any construction or other land altering activity that could result in construction-related vibration. Potential vibration due to future construction activities would be assessed in conjunction with the City’s routine review of site -specific geotechnical studies and the recommended grading and foundation design measures.
The Nosie section of the General Plan Draft EIR concluded that th ere would be no impacts with implementation of General Plan policies:
• Airport Noise: The City of Colton is not located within an airport land use plan area or within two miles of a public airport or private airstrip. The nearest airport is the San Bernardino International Airport is located approximately three miles east of Colton. The City is not located within the 65 dBA contour map for the San Bernardino International Airport. As such, the proposed project would not expose residents or workers within two miles of an airport to excessive noise levels associated with air traffic.
3.8.2 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan
Meridian Consultants 36 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
or noise ordinance, or applicable standards of other agencies? b) Generation of excessive groundborne vibration or groundborne noise levels? c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the p roject area to excessive noise levels?
3.8.3 Environmental Impacts
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less than Significant Impact. Since the proposed project would not involve any new development, there would be no potential for substantial temporary or permanent noise levels related to construction activities. There would also be no noise generation changes with operations associated with development since there would be no land uses changes.
The potential for noise changes due to the proposed project would be limited to traffic noise, and in particular truck-related noise. Implementation of the proposed designated truck routes would be expected to reduce truck traffic along the following roadway segments within residential areas where 2016 City Truck Routes have been proposed for removal:
• Valley Boulevard (between Pepper Avenue and western City limit) • Barton Road (between La Cadena Drive and I-215)
• Washington Street (Mt. Vernon Avenue to I-215)
• Hunts Lane (Commercial Road to North City Limits)
The Project also proposes to reclassify routes from a City Truck Route to a Local Truck Route. The reclassification would create designated local routes for trucks to access commercial businesses and reduce neighborhood cut-through truck traffic. The following 2016 City Truck Routes are proposed to be reclassified as Local Truck Routes:
• M Street (La Cadena Drive to Mt. Vernon Avenue)
• Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive) • Laurel Street (Pennsylvania Avenue to La Cadena Drive) The removal of La Cadena Drive (Laurel Street to Mt. Vernon Avenue) as a Truck Route would restrict through trucks from using reclassified Local Truck Routes as cut-through to other jurisdictions and
Meridian Consultants 37 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
would require them to instead remain on the freeways (I -10 and I -215) to reach their destination.
Noise levels on the aforementioned Truck Routes would be reduced consistent with the reduction of truck traffic along these routes. The rerouting of existing truck traffic would result in no more than 50 truck trips per day being rerouted to the proposed Truck Routes.
The following additional routes are to be designated as Local Truck Routes:
• Cooley Drive (Mt. Vernon Avenue to the driveway north of Valleywood Street) • Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street) • Congress Street (Fogg Street to 8th Street)
• 8th Street (Congress Street to Fogg Street)
Count data recorded 414 heavy-duty trucks currently using Cooley Drive and 208 heavy-duty trucks using the Fogg Street/Congress Street/8 th Street corridor. The truck volumes at the aforementioned routes would be maintained with the truck route designation. Existing truck traffic rerouted to these routes would originate from other local -serving trucks accessing commercial businesses on other neighborhood streets fronted by a park and an elementary school . The rerouting of existing truck traffic would result in no more than 50 truck trips per day being rerouted to Local Truck Routes.
According to standard traffic noise modeling methodology (FHWA), a doubling in traffic volume results in an increase of approximately 3 dBA in roadway noise levels. 1 A 3 -dBA increase is considered a noticeable but marginal increase in noise and is at the threshold of perceptibility for most people. The rerouting of existing truck trips would not result in a doubling of traffic volumes on any of the Truck Routes. Any increases in noise levels would be negligible. Further, the proposed Truck Routes would be consistent with AB 98 requirements and would establish designated truck routes where properties fronting these roads at least 50 percent commercial and industrial, thereby limiting sensitive receptors (i.e. residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project. b) Generation of excessive groundborne vibration or groundborne noise levels?
1 Federal Highway Adminstration, Highway Traffic Noise: Analysis and Abatement Guidance, https://www.fhwa.dot.gov/environment/noise/regulations_and_guidance/analysis_and_abatement_guidance/revguidance.pdf . Accessed November 2025.
Meridian Consultants 38 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Less than Significant Impact. Since the proposed project would not involve any new development, there would be no potential for substantial temporary or permanent excessive groundborne vibration. As discussed above, the potential for vibration changes due to the proposed project would be limited to traffic vibration, and in particular truck -related vibration. According to the F ederal Transit Administration,2 typical road traffic–induced vibration levels are unlikely to be perceptible by people. Trucks and buses typically generate ground-borne vibration velocity levels of approximately 63 VdB (at a 50-foot distance). The Project would not change the absolute number of truck trips. The rerouting of existing truck traffic would result in no more than 50 truck trips per day being rerouted to the proposed Truck Routes. The rerouting of existing truck trips would not result in a doubling of traffic volumes on any of the Truck Routes. Any increases in vibration levels would be negligible. Further, the proposed Truck Routes would be consistent with AB 98 requirements and would establish designated truck routes where propert ies fronting these roads at least 50 percent commercial and industrial, thereby limiting sensitive receptors (i.e. residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
No Impact. The proposed Project does not include any development and would not expose people residing or working in the project area to airport noise. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
3.8.4 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR did not identify any Noise mitigation measures.
2 Federal Transit Administration. Transit Noise and Vibration Impact Assessment, FTA report no. 0123. September 2018 https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/research-innovation/118131/transit-noise-and-vibration-impact- assessment-manual-fta-report-no-0123_0.pdf. Accessed November 2025.
Meridian Consultants 39 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
3.9 TRANSPORTATION /TRAFFIC
3.9.1 Summary of Impacts Identified in the 2013 General Plan EIR
The Transportation section of the General Plan Draft EIR concluded that the following impacts would be Significant and Unavoidable even with implementation of General Plan policies. No feasible mitigation measures were identified:
• Individual and Cumulative Level of Service Standards and Traffic Load and Capacity: The 2013 General Plan EIR identified that with the intensities of development associated with the General Plan Update, nineteen (19) study intersections would operate at a deficient level of service (LOS) F . Conditions following the intersections would worsen to LOS F , or compound to worse LOS F operations, in the future due to long -term implementation of General Plan land use policies and new development, including the West Valley Specific Plan area and in the Pellissier Ranch/La Loma Hills area. Therefore, long-term implementation of the General Plan Update land use policy, in combination with regional contributions to traffic on the local road network, would result in significant and avoidable impacts to LOS standards and traffic load and capacity.
The Transportation and Traffic of the General Plan Draft EIR concluded that the following impacts would be Less Than Significant with the implementation of General Plan policies and Without Mitigation:
• Air Traffic Patterns, Traffic Levels, or Location: According to the 2013 General Plan EIR, future development proposed pursuant to the General Plan Update would not affect air traffic patterns due to Colton’s distance from Ontario International Airport. Therefore, impacts on air traffic patterns would be less than significant and no mitigation is required. • Design Features or Incompatible Uses: According to the 2013 General Plan EIR, intent of the Mobility Element includes provision of safe traffic conditions citywide, for all mobility modes. Therefore, the General Plan Update would include Policy M-1.2, M-3.2, M-3.6, and M-
4.1. With implementation of the proposed Mobility Element policies, street improvements would be designed in accordance with all applicable standards relating to vehicle traffic, bicycles, and pedestrian safety. Impacts would be less than significant and no mitigation is required.
• Emergency Access: According to the General Plan EIR, future development of the General Plan Update would be subject to the provisions of the City’s Fire Code with regard to providing adequate emergency access. The General Plan Update does not include policies that would
Meridian Consultants 40 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
change standards to emergency access or interfere with policy implementation. Therefore, impacts would be less than significant and no mitigation is required. • Parking Capacity: According to the 2013 General Plan EIR, the General Plan Update supports provision of adequate parking in future developments through Policy M-6.1 thru M-6.6.
Through implementation of these policies, in conjunction with the parking supply and design standards of the City’s Zoning Code, impacts to adequate parking would be less than significant. No mitigation is required.
• Adopted Policies, Plans, or Programs : According to the 2013 General Plan EIR, the General Plan Update would not interfere with any adopted plan or policy related to alternative transportation. The General Plan Update would include Policies M-1.1 through M-1.5, Policies M-2.1 through M-2.14, and Policy M-3.8, which would support alternative modes of transportation including public transit, bicycling, and walking. Additionally, the proposed Complete Streets Plan would promote development of street design that can accommodate diverse travel modes. Therefore, no adverse impact to alternative transportation plans, programs, or facilities would occur and impacts would be less than significant. No mitigation is required.
3.9.2 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)? c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? d) Result in inadequate emergency access?
3.9.3 Environmental Impacts
a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? No Impact. In compliance with AB 98, the proposed project is an update to the General Plan Mobility Element. As described in Section 2.0, Project Description, the project complies with this legislation.
The project, including the designation of truck routes and weight restricted routes, would not conflict with any policies, plans or programs for transportation. b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)? No Impact . The General Plan EIR evaluated potential level of service impacts to the City’s transportation network but did not analyze potential Vehicle Miles Traveled (VMT) with and without
Meridian Consultants 41 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
the project. On September 27, 2013, SB 743 was signed into law and started the process to eliminate auto delay, level of service (LOS) and traffic congestion as the basis of determining significant impacts under CEQA. The Governor’s Office of Planning and Research developed alternative metrics and thresholds based on VMT. The guidelines were certified by the Secretary of the Natural Resources Agency in December 2018, and automobile delay, as described solely by level of service— or similar measures of vehicu lar capacity or traffic congestion —is not considered a significant impact on the environment. There was an opt-in period until July 1, 2020, for agencies to adopt new VMT-based criteria. The City of Colton published VMT Guidelines for General Plan Compliance analysis and CEQA VMT Analysis in June 2020.
The proposed project would not alter land uses and therefore would not change truck volumes as a whole, but rather shift no more than 50 truck trips onto parallel routes. Route changes as a result of designated truck routes and weight restrictions could affect the distance of some truck travel. This would be anticipated to be minimal. Regardless, the VMT methodology does not include heavy trucks. The model includes total VMT per capita for residential projects and VMT per employee for office and industrial projects. The proposed project would not impact VMT. c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? No Impact . The proposed project does not include circulation network modifications or improvements. Implementation would not result in impacts related to traffic hazards. d) Result in inadequate emergency access?
No Impact . The proposed project does not include circulation network modifications or improvements. The proposed Project would remove existing 2016 City Truck Routes on four (4) roadways and would, reclassify two four (24) routes from a City Truck Route to a Local Truck Route, and designate four (4) additional routes as Local Truck Route s. The Project would not change the absolute number of truck trips. The rerouting of existing truck traffic would result in no more than 50 existing truck trips per day bein g rerouted to the proposed Truck Routes and would not result in a significant increase of trips on designated evacuation routes. Implementation would not result in impacts related to emergency access.
3.9.1 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR includes mitigation measures to address the LOS impacts of implementing the General Plan. These measures are not applicable to the proposed Mobility Element update.
Meridian Consultants 42 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
4.0 FINDINGS
As summarized below, and for the reasons described in Section 3, Environmental Analysis, of this Addendum, the City of Colton has concluded that the proposed project meets the conditions of CEQA Guidelines Section 15164 and that therefore an Addendum to the certified EIR is the appropriate CEQA document to address the proposed project.
As previously discussed, under CEQA Guidelines Section 15164, an addendum to an EIR or MND may be prepared if only minor technical changes or additions are necessary or none of the conditions described in CEQA Guidelines Section 15162 calling for the preparation of a subsequent EIR or MND have occurred. The following restates the standards set forth in CEQA Guidelines Section 15162 as they relate to the proposed project.
1. No substantial changes are proposed in the project which would require major revisions of the previous EIR due to the involvement of new significant environmental effect or a substantial increase in the severity of previously identified significant effect.
The proposed project, the General Plan Update, is a focused effort undertaken specifically to comply with 2023 California legislation, AB 98 (and associated cleanup legislation enabled by SB 415). A primary objective of AB 98 is to minimize the environment al impact of logistic facilities on surrounding communities, and in particular to sensitive receptors (residential, schools, daycare, etc.). As summarized in Section 3.0, Environmental Analysis, The proposed project:
• Would not alter any land use designations and therefore not permit any new land uses in comparison to the existing General Plan.
• Is limited to designating truck routes and assigning weight restrictions for some roadways and modifying applicable policies.
As detailed in the Environmental analysis, Implementation of updated General Plan would not involve any new significant environmental effects or substantially increase the severity of any previously identified significant impact. On the contrary, the analy sis in this Addendum demonstrates that potential beneficial environmental impacts anticipated due to the proposed project.
2. No substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
Meridian Consultants 43 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
This Addendum evaluates the potential incremental effects of the proposed project in comparison to baseline environmental conditions (buildout of the City in accordance with the 2013 General Plan).
There have been no substantial changes in circumstances since preparation of the General Plan EIR that would require major revisions to the EIR due to the involvement of new significant impacts or substantial increase in the severity of impacts previously identified.
3. No new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
a. The project will have one or more significant effects not discussed in the previous EIR or negative declaration
There have been no changes of substantial importance that would result in one or more significant effects not discussed in the original General Plan EIR. The proposed project would not result in any new significant effects relative to the original General Plan EIR. b. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
This Addendum reviews all environmental topics for the proposed project’s potential impacts. The project would result in beneficial impacts and would not result in any impacts more severe than the original General Plan EIR. c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
The proposed project would result in beneficial impacts to some categories and not affect the majority of impact categories. Implementation would not result in more severe impacts than the original General Plan EIR and no additional mitigation measures or alternatives were considered.
d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
See Response to condition C. No additional mitigation measures or alternatives were required or considered.
Exhibit A-2
of Reso #R-93-25
General Plan Mobility Element
TRUCK ROUTES
Colton, California, Code of Ordinances Created: 2025-10-01 08:22:21 [EST] (Supp. No. 39)
General Plan Mobility Element Update (December 2025)
Recommended Changes to Page M-47 of the 2013 Mobility Element Truck Routes
The delivery of goods directly to and from Colton businesses is primarily provided by trucks on surface streets.
The State of California Vehicle Code has established regulations on the use of local roads by trucks and other heavy vehicles. To protect residential neighborhoods from the impacts of the high volumes truck traffic, certain streets have been designated as truck routes by local ordinance. The City strives to connect local truck routes with other cities’ truck routes to form an integrated regional network for the movement of goods.
Routes are designated based on the industrial districts served, access to freeways, industrial, and connector streets, and avoidance of residential neighborhoods. Identifying truck routes is important not just to preserve dedicated routes to serve industrial districts and reduce land use conflicts, but also to allow for proper street construction and maintenance, given that heavy truck traffic impacts physical street conditions more quickly than automobile traffic.
Truck routes are listed below and shown on Figure M-8.1. will continue to be defined by ordinance via the Municipal Code and will require City Council approval for modification. Truck routes are subject to change based on vehicular traffic, changes to surrounding city truck routes, enforcement, and trucking demand through Colton.
Modification to designated truck routes will require a General Plan Amendment to the Mobility Element and an update and dissemination of a new GIS truck map.
The specified portions of the following public streets are hereby designated as "Truck Routes." Truck Routes. These truck routes provide access to businesses within and adjacent to the City.
1. Mt. Vernon Avenue (Washington Street to North City Limits)
2. Colton Avenue (Mt. Vernon Avenue to East City Limits)
3. Fairway Drive (Mt. Vernon Avenue to East City Limits)
4. Valley Boulevard ( within Colton City Limits between Pepper Avenue and western City limit and between Rancho Avenue and its eastern terminus at Sperry Drive)
5. Pepper Avenue (within Colton City Limits)
6. La Cadena Drive (Valley Boulevard to South City Limits)
7. Agua Mansa Road (West City limits to Rancho Avenue)
8. 10. Riverside Avenue (within Colton City Limits)
9. 11. Iowa Avenue (La Cadena Drive to South City Limits) Exhibit A-2
Of Reso # R-93-25
Created: 2025-10-01 08:22:20 [EST]
(Supp. No. 39)
10. 12. M Street (La Cadena Drive to Mt. Vernon Avenue)
12. 13. Barton Road (within Colton City Limits between La Cadena Drive and I-215)
13. 14. Washington Street (Mt. Vernon Avenue to East City Limits I-215)
14. 15. Hunts Lane (Washington Street Commercial Road to North City Limits)
15. 16. Rancho Avenue (La Cadena Drive to Valley Boulevard) The specified portions of the following public streets are hereby designated as “Local Truck Routes”. Local truck routes provide access to businesses that require use of local roadways to access existing industrial uses. Local Truck Routes:
1. M Street (La Cadena Drive to Mt. Vernon Avenue)
2. Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive)
3. Laurel Street (Pennsylvania Avenue to La Cadena Drive)
4. La Cadena Drive (Laurel Street to Mt. Vernon Avenue)
5. Cooley Drive (Mt. Vernon Avenue to 514 feet north of Valleywood Street)
6. Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street)
7. Congress Street (Fogg Street to 8th Street)
8. 8th Street (Congress Street to Fogg Street)
Proposed Changes to Page M-56 of the 2013 General Plan Mobility Element
Created: 2025-10-01 08:22:20 [EST]
(Supp. No. 39)
Proposed Changes to Page M-56 of the 2013 General Plan Mobility Element Goods Movement
The efficient movement of goods and freight support the economic success of the City and local and regional businesses. The transportation system needs to respond to the needs of businesses to easily access regional routes and access local commercial and industrial business. The designation of truck routes and maintained rail lines and spurs are central to these needs.
Goal M-5: Maintain an efficient network of goods and freight movement that supports the needs of Colton businesses while reducing truck and rail traffic impacts on residential neighborhoods.
Policy M‐5.1: Work with railroad operators to limit the aesthetic, noise, vibration, traffic congestion, and air quality impacts of new projects on residential neighborhoods adjacent to railroad lines and railroad projects.
Policy M‐5.2: Ensure that Colton Crossing design, construction activities, maintenance, and railroad operations do not create negative adverse impacts to surrounding residential properties.
Policy M‐5.3: Maintain the Railroad Quiet Zones through Colton to limit locomotive horn blowing adjacent to residential neighborhoods.
Policy M‐5.4: Support the abandonment or the realignment of railroad spurs that no longer serve industrial‐support services and that create pedestrian safety conditions.
Policy M‐5.5: Vigorously enforce established truck routes to discourage truck shortcuts through residential neighborhoods and study the feasibility of new alternative routes that avoid sensitive receptors. Designate Truck Routes in coordination with adjacent jurisdictions to accommodate the safe and efficient movement of trucks to truck-served uses. Establish Local Truck Routes that permit access to local businesses only and prohibit through truck traffic.
Policy M-5.6: The City shall establish and maintain specific truck routes for the transport of goods, materials, or freight for storage, transfer, or redistribution to safely accommodate additional truck traffic and avoid residential areas and sensitive receptors, as defined by Section 65098 of the California Government Code as follows: Truck routes shall maximize the use of interstate or state divided highways as preferred routes for truck routes and maximize use of arterial roads, major thoroughfares, and local roads that predominantly serve commercial or industrial uses when state or interstate highways are not utilized. • Major or minor collector streets and local roads that predominantly serve commercial or industrial uses shall be used for truck routes only when strictly necessary to reach existing industrial uses. Truck routes shall be designated on streets that minimize exposure to sensitive receptors, including residential areas, schools, public parks, and hospitals.
Created: 2025-10-01 08:22:20 [EST]
(Supp. No. 39)
• Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
• The City shall install conspicuous signage to identify truck routes and additional signage for truck parking and appropriate locations for idling and parking. • The City shall engage all economic segments of the community when changes or modifications to the City’s designated truck routes are being considered. • The City shall maintain a GIS map of the designated truck routes and share the information with appropriate users.
Ensure that the designated truck routes conform to the following performance criteria:
• Truck routes must avoid intrusions into residential neighborhoods to limit noise, vibration, and air quality impacts.
• To the extent feasible, truck routes will not be provided on local streets and on streets with mostly residential frontage.
• Truck routes must be located on roadways that provide direct and convenient access between Major Arterials and freeways (I‐10 and I‐215) and industrial and commercial businesses.
• Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
! !
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
! !
!
!
!
! ! ! ! ! !
! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
! ! ! ! !
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!!!!!
!
!
!
!
!
!
! !!!!
!!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
Date: 12-2-2025, Proposed.
Prepared by: Fehr & Peers.
Source: City of Colton, 2025.
0 2,000 4,000 6,000 8,000
Feet
Adjacent Agency Truck Route
National Highway Freight Network
Local Truck Route
City Truck Route
Truck Routes
Watercourse
Railroad Tracks
! ! ! !
Sphere of Influence
City Boundary
Boundaries
Truck Route Plan
Figure M-8:
Lytle Cree
k Chan
nel
CIT Y O F
R IA LTO
CIT Y O F
G R A N D T ERR A CE
CIT Y O F
LO M A LI ND A
CIT Y O F
SA N B ER N A R D I NO
R IV ER S I D E CO U N TY
CIT Y O F
R IA LTO
K St
H St
L St
Glenwood Ave
Washington St
3rd St
D St
7th
St
Rancho Ave
Canyon
Rd
tS ggoF
M St
Pellissier Rd
Shasta Dr
evA reppeP
Valley Blvd
Riverside Ave
tS eniP
Cahuilla St
.rD yelooC
6th
St
y
W zerauJ nhoJ
evA ainavlysnneP
F St
Mansa
Barton Rd
Washington St
Bordwell Ave
Cooley Ln
Palm Ave
Congress St
La Cadena Dr
Rancho Ave
Cypress St
Pennsylvania Ave
La Cadena Dr
Rd
Prado Ln
Ellen St
Agua
Rosedale Ave
4th
St
Sycamore Ave
Citrus St
evA reppeP
evA naidire
M
C St
evA nonreV .t
MLa Cadena Dr.
Fairway Dr
Michelle Dr.
Barton Rd
8th St
Rancho Ave
San Bernardino Ave
Fogg St
Litton Ave
Shadid Dr.
Cisco St.
evA evilO
Grand Ave
Johnston St
evA weivriaF
Olive St
Mill St
Colton Ave
Reche
Citrus St
B St
10th St
O St
tS ht8
Cooley Dr
Randall Ave
evA nonreV .t
M
Slover Ave
N St
F St
G St
Bostick Ave
Valley Blvd
H St
Steel Rd
tS ht5
9th
St
evA sutpylacuE
E St
Laurel St
Hanna St
M St
C St
Hunts Ln
Santa Ana River
Santa Ana River
Highgrove
Riverside Chann
el
Rialto Channel
W. Riverside
Chann
el
Gage Channel
Blue
Prado Lane Creek
Rec
he Canyon Channel
Warm Creek
Lytle Creek
San Timoteo
City Creek Channel
Cooley
Channel
Creek
Moun
tain
lennahC egaG
Channel
Wash
SAN BERNARDINO
COUNTY
Lytle Creek C
hann
el
CIT Y O F
R IA LTO
CIT Y O F
G R A N D T ERRA CE
CIT Y O F
LO M A LI ND A
CIT Y O F
SA N B ER N A R D I NO
R IV ER S I D E CO U N TY
CIT Y O F
R IA LTO
K St
H St
L St
Glenwood Ave
Washington St
3rd St
D St
7th
St
Rancho Ave
Canyon
Rd
tS ggoF
M St
Pellissier Rd
Shasta Dr
evA reppeP
Valley Blvd
Riverside Ave
tS eniP
Cahuilla St
.rD yelooC
6th
St
y
W zerauJ nhoJ
evA ainavlysnneP
F St
Mansa
Barton Rd
Washington St
Bordwell Ave
Cooley Ln
Palm Ave
Congress St
La Cadena Dr
Rancho Ave
Cypress St
Pennsylvania Ave
La Cadena Dr
Rd
Prado Ln
Ellen St
Agua
Rosedale Ave
4th
St
Sycamore Ave
Citrus St
evA reppeP
evA naidire
M
C St
evA nonreV .t
MLa Cadena Dr.
Fairway Dr
Michelle Dr.
Barton Rd
8th St
Rancho Ave
San Bernardino Ave
Fogg St
Litton Ave
Shadid Dr.
Cisco St.
evA evilO
Grand Ave
Johnston St
evA weivriaF
Olive St
Mill St
Colton Ave
Reche
Citrus St
B St
10th St
O St
tS ht8
Cooley Dr
Randall Ave
evA nonreV .t
M
Slover Ave
N St
F St
G St
Bostick Ave
Valley Blvd
H St
Steel Rd
tS ht5
9th
St
evA sutpylacuE
E St
Laurel St
Hanna St
M St
C St
Hunts Ln
Santa Ana
River
Santa Ana River
Highgrove
Riverside
Cha
nne
l
Rialto Channe
l
W. River
side
Channe
l
Gage Channe
l
Blue
Prado
Lane Creek
Reche
Canyon
Chann
el
Warm Creek
Lytle Creek
San Timoteo
City Creek Channel
Cooley
Channel
Creek
Mount
ain
lennahC egaG
Channel
Wash
SAN BERNARDINO
COUNTY
Union Pacific
Colton Railyard
BNSF San Bernardino
Railyard
10 215
Union Pacific
Colton Railyard
BNSF San Bernardino
Railyard
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
! !
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
! !
!
!
!
! ! ! ! ! !
! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
! ! ! ! !
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!!!!!
!
!
!
!
!
!
! !!!!
!!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
Date: 12-2-2025, Proposed.
Prepared by: Fehr & Peers.
Source: City of Colton, 2025.
0 2,000 4,000 6,000 8,000
Feet
Adjacent Agency Truck Route
City Truck Route
Local Truck Route
Removed City Truck Route
National Highway Freight Network
Watercourse
Railroad Tracks
! ! ! !
Sphere of Influence
City Boundary
Boundaries
Truck Route Removals
Figure M-8.1:
Truck Routes
Lytle Cree
k Chan
nel
CIT Y O F
R IA LTO
CIT Y O F
G R A N D T ERR A CE
CIT Y O F
LO M A LI ND A
CIT Y O F
SA N B ER N A R D I NO
R IV ER S I D E CO U N TY
CIT Y O F
R IA LTO
K St
H St
L St
Glenwood Ave
Washington St
3rd St
D St
7th
St
Rancho Ave
Canyon
Rd
tS ggoF
M St
Pellissier Rd
Shasta Dr
evA reppeP
Valley Blvd
Riverside Ave
tS eniP
Cahuilla St
.rD yelooC
6th
St
y
W zerauJ nhoJ
evA ainavlysnneP
F St
Mansa
Barton Rd
Washington St
Bordwell Ave
Cooley Ln
Palm Ave
Congress St
La Cadena Dr
Rancho Ave
Cypress St
Pennsylvania Ave
La Cadena Dr
Rd
Prado Ln
Ellen St
Agua
Rosedale Ave
4th
St
Sycamore Ave
Citrus St
evA reppeP
evA naidire
M
C St
evA nonreV .t
MLa Cadena Dr.
Fairway Dr
Michelle Dr.
Barton Rd
8th St
Rancho Ave
San Bernardino Ave
Fogg St
Litton Ave
Shadid Dr.
Cisco St.
evA evilO
Grand Ave
Johnston St
evA weivriaF
Olive St
Mill St
Colton Ave
Reche
Citrus St
B St
10th St
O St
tS ht8
Cooley Dr
Randall Ave
evA nonreV .t
M
Slover Ave
N St
F St
G St
Bostick Ave
Valley Blvd
H St
Steel Rd
tS ht5
9th
St
evA sutpylacuE
E St
Laurel St
Hanna St
M St
C St
Hunts Ln
Santa Ana River
Santa Ana River
Highgrove
Riverside Chann
el
Rialto Channel
W. Riverside
Chann
el
Gage Channel
Blue
Prado Lane Creek
Rec
he Canyon Channel
Warm Creek
Lytle Creek
San Timoteo
City Creek Channel
Cooley
Channel
Creek
Moun
tain
lennahC egaG
Channel
Wash
SAN BERNARDINO
COUNTY
Lytle Creek C
hann
el
CIT Y O F
R IA LTO
CIT Y O F
G R A N D T ERRA CE
CIT Y O F
LO M A LI ND A
CIT Y O F
SA N B ER N A R D I NO
R IV ER S I D E CO U N TY
CIT Y O F
R IA LTO
K St
H St
L St
Glenwood Ave
Washington St
3rd St
D St
7th
St
Rancho Ave
Canyon
Rd
tS ggoF
M St
Pellissier Rd
Shasta Dr
evA reppeP
Valley Blvd
Riverside Ave
tS eniP
Cahuilla St
.rD yelooC
6th
St
y
W zerauJ nhoJ
evA ainavlysnneP
F St
Mansa
Barton Rd
Washington St
Bordwell Ave
Cooley Ln
Palm Ave
Congress St
La Cadena Dr
Rancho Ave
Cypress St
Pennsylvania Ave
La Cadena Dr
Rd
Prado Ln
Ellen St
Agua
Rosedale Ave
4th
St
Sycamore Ave
Citrus St
evA reppeP
evA naidire
M
C St
evA nonreV .t
MLa Cadena Dr.
Fairway Dr
Michelle Dr.
Barton Rd
8th St
Rancho Ave
San Bernardino Ave
Fogg St
Litton Ave
Shadid Dr.
Cisco St.
evA evilO
Grand Ave
Johnston St
evA weivriaF
Olive St
Mill St
Colton Ave
Reche
Citrus St
B St
10th St
O St
tS ht8
Cooley Dr
Randall Ave
evA nonreV .t
M
Slover Ave
N St
F St
G St
Bostick Ave
Valley Blvd
H St
Steel Rd
tS ht5
9th
St
evA sutpylacuE
E St
Laurel St
Hanna St
M St
C St
Hunts Ln
Santa Ana
River
Santa Ana River
Highgrove
Riverside
Cha
nne
l
Rialto Channe
l
W. River
side
Channe
l
Gage Channe
l
Blue
Prado
Lane Creek
Reche
Canyon
Chann
el
Warm Creek
Lytle Creek
San Timoteo
City Creek Channel
Cooley
Channel
Creek
Mount
ain
lennahC egaG
Channel
Wash
10 215
SAN BERNARDINO
COUNTY
Grand Terrace
Fontana
Rialto
Loma Linda
Bloomington
CDP
Unincorporated
Valley
San
Bernardino
Jurupa Valley
Riverside
Jurupa Valley
City of Colton
COL
TON
AVE
LAUREL ST
FAIRWAY DR
COOLEY LN
RECHE CANYON RD
OLIVE ST
B ST
PEPPER AVE
CONGRESS ST
MILL ST
O ST
PENNS
YLVA
NIA
A
VE
ROS
ED
ALE A
VE
RANDALL AVE
STEEL RD
LITTON AVE
C ST
CITRUS ST
JOHNSTON ST
8TH ST
M
ERIDIAN AVE
D ST
SLOVER AVE
LA CADENA DR
7TH S
T
9TH ST
5TH S
T
H ST
N ST
F ST
E ST
M ST
G STVALLEY BLVD
BOSTICK AVE
10TH S
T
RANCHO A
VE
BARTON RD
COOLEY DR
AGUA MANSA RD
EUCALYPTUS AVE
WASHINGTON ST
RIVER
SIDE A
VE
MIGUEL BUSTAM
A
N
TE PKWY
MT. VERNON A
VE
HUNTS LN
COOLEY DR
FOGG S
T
10 215
Citywide 2025 Truck Route Update
0 1 2
Miles
City Boundary
Adjacent Agency Truck Route
City of Colton Truck Route
Legend
Local Truck Route
National Highway Freight Network
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
ORDINANCE NO._O-10-25__
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF COLTON
TO SECTION 10.60 OF TITLE 10 OF THE COLTON MUNICIPAL CODE,
AS THEY PERTAIN TO TRUCK ROUTES IN THE CITY OF COLTON
AND ADOPTION OF AN ADDENDUM TO THE ENVIRONMENTAL
IMPACT REPORT FOR THE COLTON 2013 GENERAL PLAN UPDATE
PROJECT (STATE CLEARINGHOUSE NO. 2012031037): FILE INDEX NUMBER DAP25-0024
WHEREAS, on November 16, 2016, the City Council adopted Section 10.60 of Title 10 of the Colton Municipal Code, amending the 2016 Truck Routes Master Plan; and
WHEREAS, the Planning Commission of the City of Colton (“Planning Commission”) held a public hearing on November 11, 2025, after giving duly published notice, to consider an amendment to the General Plan Mobility Element and to Section
10.60 of T itle 10 of the C olton Municipal Code regarding truck routes and to adopt an accompanying addendum to the EIR for the 2013 General Plan Update Project, at which time it considered all oral and written testimony regarding the amendment; and WHEREAS, all other legal prerequisites to the adoption of this ordinance have occurred;
WHEREAS, the City of Colton Planning Commission has determined that the above-described project will not have a significant effect on the environment and has recommended adoption of an addendum to 2013 General Plan Environmental Impact Report (EIR).
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COLTON
DOES ORDAIN AS FOLLOWS:
SECTION 1. The City Council hereby adopts the recitals and findings set forth above and in the agenda report prepared in connection with this Ordinance.
SECTION 2. Title 10, Chapter 10.60 (Truck Routes) , is hereby amended by deleting, modifying and/or adding the text as shown in the attached pages of Section 10.60 (Truck Routes) of Title 10 of the Colton Municipal Code, as it pertains to truck routes in the City of Colton (Exhibit A-2) (New Text is shown Double Underline and deleted text is shown in strikethrough.)
SECTION 3. . Severability. If any section, subsection, subdivision, sentence, clause, phrase, or portion of this ordinance for any reason is held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this ordinance. The City Council hereby declares that it would have adopted this ordinance, and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof, irrespective of t he fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, or portions thereof be declared invalid or unconstitutional.
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
Colton Planning Commission Ordinance No. O-10-25
- 2 -
SECTION 4. Based on the entire record before it and all written and oral evidence presented, the City Council finds that pursuant to the California Environmental Quality Act (CEQA), under California Public Resources Code section 21080.17, the California Environmental Quality Act (“CEQA”), pursuant to the California Environmental Quality Act Guidelines, an Addendum to the 2013 EIR was prepared because the proposed modifications to the 2013 Mobility Element do not result in any of the circumstances requiring a Subsequent or Supplemental EIR within Exhibit-“A.1” of this ordinance. The proposed modifications do not result in development that differs in street use or changes contrary to policies within the 2013 Mobility Element than what was assumed in the 2013 EIR, those modifications do not trigger the need for preparation of a Subse quent or Supplemental EIR under the criteria listed in CEQA Guidelines Sections 15162 and 15163, respectively. The Addendum to the 2013 EIR demonstrates that no substantial changes would result from the revised project modifications nor have the existing conditions in the project vicinity substantially changed such that major revisions to the 2013 EIR would be required. The project would not result in a new significant environmental effect or a substantial increase in the severity of previously identified significant effects. Specifically, the proposed Truck Route amendments, as compared to the 2016 Truck Route Master Plan, do not result in new or substantially greater significant impacts because the scale and nature of the proposed truck routes are sufficiently similar to that analyzed in the 2013 General Plan EIR such that the impacts of the proposed amendments to the 2016 Truck Route Master Plan are within the levels and types of environmental impacts disclosed in the 2013 General Plan EIR.
SECTION 5. Certification/Publication. The City Clerk shall certify to the passage of the ordinance and cause the same or a summary thereof to be published within fifteen (15) days after adoption in a newspaper of general circulation published and circulated in the City of Colton.
SECTION 6. This ordinance shall become effective thirty (30) days after its adoption in accordance with the provisions of California law. .
PASSED, APPROVED AND ADOPTED on this ___ day of ______, 2025. ___________________________________
Frank Navarro
Mayor
ATTEST:
__________________________________
Isaac T. Suchil
City Clerk
Exhibit A-1
of Ordinance #O-10-25
Addendum to 2013
General Plan EIR
23152.06300\44427883.1
EIR ADDENDUM
GENERAL PLAN AMENDMENT
AB 98 MOBILITY ELEMENT UPDATE
CITY OF COLTON
Prepared for:
City of Colton
Planning Department
659 N. La Cadena Drive
Colton, CA 92324
Prepared by:
Westlake Village
860 Hampshire Road, Suite P
Westlake Village, CA 91361
NOVEMBER 2025
Exhibit A-1
of Reso # R-93-25
Meridian Consultants i AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
TABLE OF CONTENTS
1.0 Introduction ................................ ................................ ................................ ........... 1
1.1 Overview .............................................................................................................. 1
1.2 Purpose ................................................................................................................ 1
1.3 City of Colton Background ..................................................................................... 2
1.4 Assembly Bill 98 ................................................................................................... 2
1.5 California Environmental Quality Act ..................................................................... 3
1.6 Environmental Procedures .................................................................................... 3
1.7 City of Colton General Plan (Approved Project) ...................................................... 5
1.8 Prior Environmental Documentation: General Plan Draft EIR .................................. 8
2.0 Project Description ................................ ................................ ................................ 10
2.1 Project Location ................................................................................................. 10
2.2 Project Background............................................................................................. 10
2.3 Project Characteristics ....................................................................................... 13
3.0 Environmental Analysis ................................ ................................ ......................... 23
3.1 Approach ..................................................................Error! Bookmark not defined.
3.2 Environmental Topics Determined To Have “No Impact” ...................................... 25
3.3 Environmental Factors Potentially Affected ......................................................... 25
3.4 Air Quality ........................................................................................................... 25
3.5 Greenhouse Gas Emissions ................................................................................ 29
3.6 Land Use & Planning ........................................................................................... 31
3.7 Noise and Vibration ............................................................................................ 33
3.8 Transportation/Traffic ......................................................................................... 37
4.0 Findings ................................ ................................ ................................ ................ 40
List of Figures
1 City of Colton Boundary ................................................................................................. 11 2 Truck Routes Existing Conditions .................................................................................... 12 3 Proposed Truck Route Removals .................................................................................... 20 4 Proposed Truck Routes Plan ........................................................................................... 21 5 Proposed Truck Route Plan and Land Use Map .............................................................. 22
Meridian Consultants 1 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
1.0 INTRODUCTION
1.1 OVERVIEW
This document is an Addendum to the City of Colton General Plan Environmental Impact Report (General Plan EIR), State Clearinghouse No. 20122031037, which was certified May 2013 . This Addendum evaluates the potential environmental impacts of the currently proposed updates to the Mobility Element of the General Plan in comparison to the General Plan adopted in May 2013. The 2013 General Plan serves as “baseline” conditions for the impact comparison. This Addendum was prepared for the City’s proposed amendment of the Mobility Element of the Colton General Plan and amendment of Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal Code (proposed Project), as defined in CEQA Guidelines Sections 15050−15051. The Lead Agency , the City of Colton, is defined as the agency with primary responsibility for approving and carrying out the proposed Project.
1.2 PURPOSE
The purpose of the proposed Project is to the bring the City into compliance with the recent legislation and its impact upon cities and counties located within a Warehouse Concentration Region (WCR) , as defined in Government Code Section 65098 , which states, “ ’Warehouse concentration region’ includes the unincorporated areas within Counties of Riverside and San Bernardino and the Cities of Chino, Colton, Fontana, Jurupa Valley, Moreno Valley, Ontario, Perris, Rancho Cucamonga, Redlands, Rialto, Riverside, and San Bernardino.” On October 3, 2025, Senate Bill 415 (SB 415) was signed into law providing various clarifications to AB 98. However, SB 415 did not alter the substantive requirements set forth by AB 98 for circulation element updates for cities and counties in the warehouse concentration region, such as Colton. As such, the City of Colton City Council is required to approved and adopt regulations to be in compliance with AB 98.
AB 98 introduces specific requirements for assigning truck routes and adopting them into the Circulation Element (Transportation and Mobility Element) of the General Plan. The City must adopt the following Truck Route Requirements:
• Truck Routes must be adopted by January 1, 2026, in the Warehouse Concentration Region (WCR) which includes the City of Colton.
• Truck Routes must maximize the use of major highways and only utilize commercial roads when necessary.
• Truck Routes will be provided in a Geographic Information System (GIS) format and will be made publicly accessible.
• Conspicuous signage will be installed to identify truck routes, truck parking, and appropriate idling locations.
1.0—Introduction
Meridian Consultants 2 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• The City must provide opportunities for public input and participation.
1.3 CITY OF COLTON BACKGROUND
Colton traces its beginnings to its founding as a railroad town. The original town of Colton, with its classic grid street network that is still evident today, was laid out when the Southern Pacific Railway (now Union Pacific) was constructed through the San Bernardino Valley on its way eastward from Los Angeles in 1875. The area around Colton was selected for a train stop instead of the City of San Bernardino due to the direct location of the town on the planned route. In fact, Colton was named for David Douty Colton, then Vice President of the Southern Pacific Railroad Company.
While the railroad defined the shape of early Colton, construction of Interstate 10 in 1957 bisected the City. Interstate 10 and later Interstate 215, opened in 1963, linked Colton by roadway to the region and the nation, but the freeways created divides that made it difficult for residents and employees of local businesses to move across town. The General Plan’s Mobility Element looks to re -establish connections to bind the community together again, even as large -scale improvements to rail lines and freeways proceed.
In 2013, the City of Colton ( City) completed an update of its General Plan, to establish a vision and guiding policies to shape and manage long term growth in the Colton planning area, which is referred to as the “General Plan Update” and is the subject of the Certified Environmental Impact Report. The General Plan Update is a long-range planning program, to guide the orderly growth and development of the Colton planning area over the long-term.
The adopted General Plan Update includes the City’s Mobility Element which establishes long‐term goals and policies designed to improve the local transportation system and create options for residents to move about the City. The Mobility Element balances the need for efficient traffic operations with the desire to maintain Colton as a safe and attractive community, one with walkable neighborhoods, successful business districts, and distinctive streets. Key transportation corridors— such as Mount Vernon Avenue and Valley Boulevard —must be able to accommodate new development and complement regional transportation while meeting local mobility needs. Policies in the Mobility and Land Use Elements together shape the overall physical structure and form of Colton.
1.4 ASSEMBLY BILL 98
The City of Colton proposes to update its 2013 General Plan Mobility Element to comply with Assembly Bill 98 (AB 98) passed on September 30, 2024, and the subsequent cleanup legislation, Senate Bill 415 (SB 415) passed on October 3, 2025. This legislation introduces significant changes to how California regulates logistics uses defined as facilities in excess of 250,000 square feet that
1.0—Introduction
Meridian Consultants 3 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
are primarily used for the handling, storage, and distribution of goods. A key component of the legislation is the requirement for cities designated by the legislation as warehouse concentration region jurisdictions to designate truck routes that are consi stent with the requirements of the bill (codified as Section 65302.02 of the Government Code) and incorporate the routes into the General Plan before January 1, 2026. This will supplement the City’s recent work in updating the City Zoning Code that resulted in the adoption of Ordinance O-01-23, adopted on February 21, 2023, amending various sections of Title 18 (Zoning Code) and providing new definitions, permitted uses, and Special Provisions which provide added standards for all City Industrial zones rel ated to truck and trail er storage uses, general warehouses, and warehouse logistics and distribution projects.
Per AB 98, the City must consider the following when updating the truck routes:
• Ensure efficient and safe routes for goods movement
• Maximize the use of freeways, highways, and major roadways (arterials/collectors fronted by commercial/industrial uses)
• Minimize exposure of sensitive receptors as defined by Section 65098(e) • Make a diligent effort to achieve public participation of all economic segments of the community
The proposed project would revise the City’s Mobility Element to include updated truck route designations, goals, and policies in compliance with the legislation.
1.5 CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
CEQA is a Statewide environmental law codified in the California Public Resources Code §§ 21000 - 21177. CEQA applies to most public agency decisions to carry out, authorize, or approve actions that have the potential to adversely affect the environment. CEQA requires that public agencies analyze and acknowledge the environmental consequences of their discretionary actions and consider alternatives and mitigation measures that could avoid or reduce significant adverse impacts to the environment when avoidance or reduction is feasible. The CEQA compliance process also gives other public agencies and the general public an opportunity to comment on a proposed project’s environmental effects.
1.6 ENVIRONMENTAL PROCEDURES
When a General Plan EIR has been certified for a project, the California Environmental Quality Act (CEQA) and the State CEQA Guidelines define standards and the procedure for additional environmental review. Sections 15162–15164 of the State CEQA Guidelines define the standards for determining the level of additional environmental review required when an EIR has been certified for a project.
1.0—Introduction
Meridian Consultants 4 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Pursuant to Section 15162 of the State CEQA Guidelines, when an EIR has been certified or a negative declaration adopted for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following:
2. Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
3. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the involvement of new significant environmental effects or a substantia l increase in the severity of previously identified significant effects; or
4. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the Negative Declaration was adopted, shows any of the following:
A) The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
B) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure o r alternative.
Under Section 15164 of the State CEQA Guidelines, when an EIR has been prepared and certified, and new information becomes available, it is appropriate to prepare an addendum to the EIR when only minor or technical additions or changes to an EIR are requir ed. The changes to the EIR are considered minor if the new information being addressed does not result either in the identification of any new significant impacts or a substantial increase in the severity of significant impacts previously identified in the EIR. A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included in an addendum to an EIR, the lead agency‘s findings on the project, or elsewhere in the record. The explanation must be supported by sub stantial evidence.
This Addendum to the certified EIR has been prepared because evaluation of the proposed project has not indicated any of the circumstances requiring a subsequent or supplemental EIR is required.
1.0—Introduction
Meridian Consultants 5 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
As demonstrated in Chapter 3, Environmental Analysis, of this Addendum, the proposed project would not result in new or more severe impacts than the approved project, and it would not trigger the need for preparation of a subsequent or supplemental EIR under the criteria in CEQA Guidelines Sections 15162(a) and 15163(a).
This Addendum demonstrates that no substantial changes are proposed to the approved project that would require major revisions to the certified EIR or substantially increase the severity of previously identified significant effects (see CEQA Guidelines Sec tion 15162[a][1]). Therefore, the impacts of the proposed project are within the levels and types of environmental impacts disclosed in the certified EIR.
As substantiated in Section 3 of this Addendum, the proposed project would not result in new significant impacts or substantially increase the severity of the impacts of the approved project due to substantial changes in circumstances since the certification of the EIR (see CEQA Gui delines Section 15162[a][2]).
In addition, no information that was not known and could not have been known at the time the General Plan EIR was certified has been revealed that shows new or substantially more severe significant impacts would result (see CEQA Guidelines Section 15162[a][3]). There are no new or considerably different mitigation measures that would substantially reduce one or more significant impacts of the approved project but that are not adopted.
Because this Addendum does not identify new or substantially more severe significant impacts, circulation for public review and comment is not necessary (CEQA Guidelines Section 15164[c]).
However, the City has considered this Addendum together with the pr eviously certified EIR prior to adoption of the proposed project, pursuant to CEQA Guidelines Section 15164(d).
1.7 CITY OF COLTON GENERAL PLAN (APPROVED
PROJECT)
1.7.1 Overview
The City of Colton incorporated in 2013 and the City Council adopted the City’s first locally prepared General Plan on May 2013. Prior to that time, the City was within the boundaries of San Bernardino County. The General Plan serves as the primary tool to guide the development and character of Colton.
The General Plan reflects consensus and compromise among citizens, businesses, and property owners. All cities and counties in California must prepare and adopt general plans and, per state law, they must include seven sections, or “elements:” Land Use, Housing, Circulation (Mobility), Noise,
1.0—Introduction
Meridian Consultants 6 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Safety, Open Space, and Conservation. The organization of these seven elements, and any optional elements, is determined by the local jurisdiction.
The elements contained in the City of Colton’s 2013 General Plan are:
• Air Quality
• Cultural Resources
• Housing
• Land Use
• Mobility
• Noise
• Open Space and Conservation
The General Plan expresses the Community’s values and broad consensus in the form of goals, policies, and programs. Goals are aspirational statements of intent that are not necessarily achievable within the 5- to 10-year planning period of this General Plan. Policies are statements that guide decision-making; they identify decisions the City must take to implement the General Plan and to make progress in achieving its goals. Programs are specific actions to be taken to carry out the General Plan’s intent.
1.7.2 Mobility Element
The Mobility Element guides the long -term circulation system of the City. Its goals and policies are designed to improve the local transportation system and create options for residents to move about the City. The Mobility Element balances the need for efficient traffic operations with the desire to maintain Colton as a safe and attractive community, with walkable neighborhoods, successful business districts, and distinctive streets. Policies within the Mobility and Land Use Elements shape the overall physi cal structure and form of Colton , so that key transportation corridors – such as Mount Vernon Avenue and Valley Boulevard – are able to accommodate new development and complement regional transportation while meeting local mobility needs.
The relevant section for the proposed Project including designating truck routes pursuant to AB 98 is Chapter: Goods Movement, Section: Truck Routes, available on page M -47 of the General Plan Mobility Element. The delivery of goods directly to and from Colton businesses is primarily provided by trucks on surface streets. Routes are designated based on the industrial districts served, access to freeways, industrial , and connector streets, and avoidance of residential neighborhoods. The following roadways serve as existing truck routes to support industrial business activity:
• Valley Boulevard
1.0—Introduction
Meridian Consultants 7 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Pepper Avenue
• Mount Vernon Avenue
• Colton Avenue
• Fairway Drive
• La Cadena Drive
• Rancho Avenue (south of Valley Boulevard)
• Washington Street
Designated truck routes are not included in the Mobility Element, as they may change over time to reflect changing land use patterns and to provide the best interests of businesses, truck drivers, and residential neighborhoods. When revising the designatio n of truck routes in Colton, as adopted by ordinance, routes must adhere to the following performance criteria:
1. Avoid unnecessary intrusions into residential neighborhoods to limit noise, vibration, and air quality impacts.
2. To the extent feasible, truck routes will not be provided on local streets and on streets with mostly residential frontage.
3. Truck routes must be located on roadways that provide direct and convenient access between Major Arterials and freeways (I -10 and I -215) and industrial and commercial businesses.
4. Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
1.7.3 Mobility Element Policies and Programs
The following Mobility Element policies and programs specifically apply to commercial trucks and routes.
Goals
Goal M-3: Develop a safe, efficient, and attractive street system that provides capacity to meet existing and future demand.
Goal M-5: Maintain an efficient network of goods and freight movement that supports the needs of Colton businesses while reducing truck and rail traffic impacts on residential neighborhoods.
Policies
1.0—Introduction
Meridian Consultants 8 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Policy M-3.2: Implement traffic-calming measures in Colton’s residential neighborhoods that are severely impacted by speeding, excessive vehicular volumes, truck traffic, and/or cut -through traffic. Use the City’s adopted traffic -calming policies to apply appropriate solutions.
Policy M-5.5: Vigorously enforce established truck routes to discourage truck shortcuts through residential neighborhoods.
Policy M-5.6: Ensure that the designated truck routes conform to the following performance criteria:
• Truck routes must avoid intrusions into residential neighborhoods to limit noise, vibration, and air quality impacts.
• To the extent feasible, truck routes will not be provided on local streets and on streets with mostly residential frontage.
• Truck routes must be located on roadways that provide direct and convenient access between Major Arterials and freeways (I -10 and I -215) and industrial and commercial businesses.
• Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
1.8 PRIOR ENVIRONMENTAL DOCUMENTATION: GENERAL
PLAN DRAFT EIR
The proposed Project is an amendment to the Mobility Element of the City of Colton General plan.
Therefore, this Addendum relies on the findings of the January 2013 Draft EIR and May 2013 Final EIR, and per CEQA Guidelines Section 15164, contains all the information necessary to ensure that the Addendum fully evaluates the proposed Project.
In accordance with CEQA Guidelines Section 15148 and 15150, this Addendum incorporates the 2013 Certified EIR (and its constituent parts) by reference. All documents incorporated by reference are available for review at the City of Colton, 659 N. La Cadena Drive, Colton, CA 92324.
A summary of the 2017 Certified EIR follows:
The City of Colton circulated the 2013 Draft EIR for a 45-day public review period. The EIR evaluated 17 topics in detail.
• Aesthetics
• Agriculture and Forestry Resources
1.0—Introduction
Meridian Consultants 9 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Air Quality
• Biological Resources
• Cultural Resources
• Geology and Soils
• Greenhouse Gas Emissions and Global Climate Change
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use and Planning
• Mineral Resources
• Noise
• Population and Housing
• Public Services
• Recreation
• Transportation and Traffic
• Utilities and Service Systems
All impacts of the Project were found to be less than significant with the implementation of the recommended mitigation measures except for the following:
• Air Quality (conflict with applicable air quality plan; violation of air quality standard or contribute substantially to air quality violation)
• Greenhouse Gas Emissions (long-term emissions; conflict with applicable plan, policy, or regulation)
• Recreation (existing parks and recreational facilities) • Transportation and Traffic (future level-of-service)
The City of Colton approved the General Plan and certified the General Plan Final EIR (State Clearinghouse No. 2012031037) on May 2013.
Meridian Consultants 0 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
2.0 PROJECT DESCRIPTION
2.1 PROJECT LOCATION
The proposed Project is located throughout most of the City of Colton, as it includes certain streets that large trucks (e.g., Big Rigs , Tractor-Trailers, or 18-wheelers) are authorized to drive on as they access locations that they deliver their goods to within the City.
The Project boundary is the same as the City’s Municipal Boundary as truck operations are mobile.
The City’s Municipal Boundary is shown in Figure 1: City of Colton Boundary, below.
2.2 PROJECT BACKGROUND
The proposed project for this Addendum is an amendment to the City of Colton General Plan’s Mobility Element. The amendment is required to comply with Assembly Bill 98 (AB 98, revised SB 415) namely to establish designated truck routes where properties fronting these roads at least 50 percent commercial and industrial, thereby lim iting sensitive receptors (i.e. residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes. The City’s existing truck routes are shown in Figure 2: Truck Routes Existing Conditions, below. The proposed truck routes, along with proposed General Plan Mobility text and policy updates represent the proposed project.
2.0—Project Description
Meridian Consultants 1 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 1 CITY OF COLTON BOUNDARY
2.0—Project Description
Meridian Consultants 2 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 2 TRUCK ROUTES EXISTING CONDITIONS
2.0—Project Description
Meridian Consultants 3 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
2.3 PROJECT CHARACTERISTICS
The proposed project for this Addendum is an amendment to the City of Colton General Plan’s Mobility Element. The amendment is required to comply with Assembly Bill 98 (AB 98, revised SB 415) namely to establish designated truck routes where properties fronting these roads at least 50 percent commercial and industrial, thereby lim iting sensitive receptors (i.e. , residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes.
The City of Colton’s (City) proposes a General Plan Amendment to update the 2013 Mobility Update to comply with Assembly Bill 98 (AB 98), which was signed by the Governor on September 30, 2024.
Subsequently, the Legislat ure passed Senate Bill 415 (SB 415) , legislation intended to clarify the regulations set forth in AB 98. SB 415 was signed by the Governor on October 3, 2025.
AB 98 and SB 415 add regulations for warehouse logistics developments that primarily handle, store, and distribute goods and these regulations must be implemented no later than January 1, 2026. As stated in Government Code Subsections 65098.1 (a)(4) and (5), (b)(4) and (5), (c)(4) and (5), and (d)(2) and (7), applicable new or expanded logistics use developments must implement the following:
• Have a separate entrance to the logistics use development or logistics park for heavy -duty trucks accessible via a truck route, arterial road, major thoroughfare, or a local road that predominantly serves commercial, agricultural, or industrial uses. A sep arate entrance for heavy-duty trucks may include a driveway with a lane dedicated to heavy -duty trucks and a lane dedicated for other vehicles.
• Locate truck entry, exit, and internal circulation away from sensitive receptors. Heavy -duty diesel truck drive aisles shall be prohibited from being used on sides of the building that are directly adjacent to a sensitive receptor property line.
In addition, Government Code Section 65098.1 establishes the deadline for complying with truck route requirements and Section 65302.02 provides specifications for designating truck routes. The City proposes to update the Mobility Element of the General Plan and amend Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal Code to ensure that any future or in - process applications for logistic use development, comply with these provisions of AB 98 and SB 415. To facilitate these updates t he City of Colton (City) proposes a General Plan Amendment to update the 2013 Mobility Element and the 2016 Truck Route Plan. The City has determined that an EIR Addendum (Addendum) is the appropriate environmental document to comply with the California Environmental Quality Act (CEQA). This is herein further known as the “Project”.
The EIR Addendum will supplement the City of Colton General Plan EIR (State Clearinghouse #2012031037). This EIR Addendum focuses on providing additional information and analysis necessary to address proposed changes within the Mobility Element of the General Plan Update and the amendment of Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal
2.0—Project Description
Meridian Consultants 4 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Code as to transportation diagrams and typical street cross sections included in the Truck Route Plan.
2.3.1 General Plan
The following text changes to the General Plan Mobility Element are proposed to better align with AB 98/SB 415 requirements. The proposed edits are shown in strike through text for deletions and double underlined text for additions.
General Plan Text Revisions
Recommended Changes to Page M-47 of the 2013 Mobility Element:
Truck Routes
The delivery of goods directly to and from Colton businesses is primarily provided by trucks on surface streets. The State of California Vehicle Code has established regulations on the use of local roads by trucks and other heavy vehicles. To protect residential neighborhoods from the impacts of the high volumes truck traffic, certain streets have been designated as truck routes by local ordinance. The City strives to connect local truck routes with other cities’ truck routes to form an integrated regional network for the movement of goods.
Routes are designated based on the industrial districts served, access to freeways, industrial, and connector streets, and avoidance of residential neighborhoods. Identifying truck routes is important not just to preserve dedicated routes to serve industrial districts and reduce land use conflicts, but also to allow for proper street construction and maintenance, given that heavy truck traffic impacts physical street conditions more quickly than automobile traffic.
Truck routes are listed below and shown on Figure M-8.1. will continue to be defined by ordinance via the Municipal Code and will require City Council approval for modification. Truck routes are subject to change based on vehicular traffic, changes to surrounding city truck routes, enforcement, and trucking demand through Colton. Modification to designated truck routes will require a General Plan Amendment to the Mobility Element and an update and dissemination of a new GIS truck map.
The specified portions of the following public streets are hereby designated as "Truck Routes. " Truck Routes. These truck routes provide access to businesses within and adjacent to the City.
1. Mt. Vernon Avenue (Washington Street to North City Limits)
2. Colton Avenue (Mt. Vernon Avenue to East City Limits)
3. Fairway Drive (Mt. Vernon Avenue to East City Limits)
2.0—Project Description
Meridian Consultants 5 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
4. Valley Boulevard (within Colton City Limits between Pepper Avenue and western City limit and between Rancho Avenue and its eastern terminus at Sperry Drive)
5. Pepper Avenue (within Colton City Limits)
6. La Cadena Drive (Valley Boulevard to South City Limits)
7. Agua Mansa Road (West City limits to Rancho Avenue)
8. 10. Riverside Avenue (within Colton City Limits)
9. 11. Iowa Avenue (La Cadena Drive to South City Limits)
10. 12. M Street (La Cadena Drive to Mt. Vernon Avenue)
12. 13. Barton Road (within Colton City Limits between La Cadena Drive and I-215)
13. 14. Washington Street (Mt. Vernon Avenue to East City Limits I-215)
14. 15. Hunts Lane (Washington Street Commercial Road to North City Limits)
15. 16. Rancho Avenue (La Cadena Drive to Valley Boulevard) The specified portions of the following public streets are hereby designated as “Local Truck Routes” .
Local truck routes provide access to businesses that require use of local roadways to access existing industrial uses. Local Truck Routes:
1. M Street (La Cadena Drive to Mt. Vernon Avenue)
2. Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive)
3. Laurel Street (Pennsylvania Avenue to La Cadena Drive)
4. La Cadena Drive (Laurel Street to Mt. Vernon Avenue)
5. Cooley Drive (Mt. Vernon Avenue to 514 feet north of Valleywood Street)
6. Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street)
7. Congress Street (Fogg Street to 8th Street)
8. 8th Street (Congress Street to Fogg Street)
Proposed Changes to Page M-56 of the 2013 General Plan Mobility Element Goods Movement
2.0—Project Description
Meridian Consultants 6 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
The efficient movement of goods and freight support the economic success of the City and local and regional businesses. The transportation system needs to respond to the needs of businesses to easily access regional routes and access local commercial and industrial business. The designation of truck routes and maintained rail lines and spurs are central to these needs.
Goal M-5: Maintain an efficient network of goods and freight movement that supports the needs of Colton businesses while reducing truck and rail traffic impacts on residential neighborhoods.
Policy M‐5.1: Work with railroad operators to limit the aesthetic, noise, vibration, traffic congestion, and air quality impacts of new projects on residential neighborhoods adjacent to railroad lines and railroad projects.
Policy M-5.2: Ensure that Colton Crossing design, construction activities, maintenance, and railroad operations do not create negative adverse impacts to surrounding residential properties.
Policy M-5.3: Maintain the Railroad Quiet Zones through Colton to limit locomotive horn blowing adjacent to residential neighborhoods.
Policy M-5.4: Support the abandonment or the realignment of railroad spurs that no longer serve industrial ‐support services and that create pedestrian safety conditions.
Policy M-5.5: Vigorously enforce established truck routes to discourage truck shortcuts through residential neighborhoods and study the feasibility of new alternative routes that avoid sensitive receptors. Designate Truck Routes in coordination with adjacent jurisdictions to accommodate the safe and efficient movement of trucks to truck -served uses. Establish Local Truck Rout es that permit access to local businesses only and prohibit through truck traffic.
Policy M-5.6: The City shall establish and maintain specific truck routes for the transport of goods, materials, or freight for storage, transfer, or redistribution to safely accommodate additional truck traffic and avoid residential areas and sensitive receptors, as de fined by Section 65098 of the California Government Code as follows: Truck routes shall maximize the use of interstate or state divided highways as preferred routes for truck routes and maximize use of arterial roads, major thoroughfares, and local roads that predominantly serve commercial or industrial uses when state or interstate highways are not utilized.
2.0—Project Description
Meridian Consultants 7 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Major or minor collector streets and local roads that predominantly serve commercial or industrial uses shall be used for truck routes only when strictly necessary to reach existing industrial uses. Truck routes shall be designated on streets that minimize exposure to sensitive receptors, including residential areas, schools, public parks, and hospitals. • Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
• The City shall install conspicuous signage to identify truck routes and additional signage for truck parking and appropriate locations for idling and parking.
• The City shall engage all economic segments of the community when changes or modifications to the City’s designated truck routes are being considered.
• The City shall maintain a GIS map of the designated truck routes and share the information with appropriate users.
Ensure that the designated truck routes conform to the following performance criteria:
• Truck routes must avoid intrusions into residential neighborhoods to limit noise, vibration, and air quality impacts.
• To the extent feasible, truck routes will not be provided on local streets and on streets with mostly residential frontage.
• Truck routes must be located on roadways that provide direct and convenient access between Major Arterials and freeways (I‐10 and I‐215) and industrial and commercial businesses.
• Truck routes must be located on roadways with the design and construction capacity to accommodate truck traffic.
2.3.2 Municipal Code
The City proposes to amend Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal Code. The following text changes to Title 10 of the Colton Municipal Code are proposed to better align with AB 98/SB 415 requirements. The proposed edits are shown in strike through text for deletions and double underlined text for additions.
2.0—Project Description
Meridian Consultants 8 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Municipal Code Text Revisions
Recommended Changes to Title 10 of the Colton Municipal Code:
Title 10 - VEHICLES AND TRAFFIC
Chapter 10.60 DESIGNATED TRUCK ROUTES
10.60.010 Title.
This Chapter shall be known as the Truck Route Ordinance. The City of Colton hereinafter shall be called "City. " This Chapter shall be applicable in the incorporated territory of the City. (Ord. No. O-20-16, § 1, 10-18-2016)
10.60.020 Designated.
A. The use of all streets within the City by any vehicle exceeding a gross weight of six fourteen thousand pounds, except upon the Truck Routes specified in the City of Colton General Plan Mobility Element Section 10.60.020(B) is prohibited. A vehicle in excess of six fourteen thousand pounds up to a maximum of fourteen thousand eighty thousand pounds, including its load, may utilize the streets and portions of streets designated as Truck Routes. Except as otherwise provided in Section 21101 et seq. and Sectio n 35701 et seq. of the California Vehicle Code, no vehicle in excess of fourteen eighty thousand pounds, including its load, shall utilize the streets and portions of streets designated as Truck Routes. Streets designated as Local Truck Routes in the City of Colton General Plan Mobility Element shall only be used by local businesses. Through truck traffic is not permitted on Local Truck Routes.
B. The specified portions of the following public streets are hereby designated as "Truck Routes. "
1. Mt. Vernon Avenue (Washington Street to North City Limits)
2. Laurel Street (Pennsylvania Avenue to La Cadena Drive)
3. La Cadena Drive (Laurel Street to Mt. Vernon Avenue)
4. Colton Avenue (Mt. Vernon Avenue to East City Limits)
5. Fairway Drive (Mt. Vernon Avenue to East City Limits)
2.0—Project Description
Meridian Consultants 9 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
6. Valley Boulevard (within Colton City Limits between Pepper Avenue and western City limit and between Rancho Avenue and its eastern terminus at Sperry Drive)
7. Pepper Avenue (within Colton City Limits)
8. La Cadena Drive (Valley Boulevard to South City Limits)
9. Agua Mansa Road (West City limits to Rancho Avenue)
10. Riverside Avenue (within Colton City Limits)
11. Iowa Avenue (La Cadena Drive to South City Limits)
12. M Street (La Cadena Drive to Mt. Vernon Avenue)
13. Barton Road (within Colton City Limitsbetween La Cadena Drive and I-215)
14. Washington Street (Mt. Vernon Avenue to East City LimitsI-215)
15. Hunts Lane (Washington Street Commercial Road to North City Limits)
16. Rancho Avenue (La Cadena Drive to Agua Mansa Road)
CB. The following street segment is proposed for restrictions to allow only trucks with a kingpin- to-rear-axle (KPRA) length of twenty-six feet or less:
1. Rancho Avenue (Valley Boulevard to Agua Mansa Road)
(Ord. No. O-20-16, § 1, 10-18-2016)
2.0—Project Description
Meridian Consultants 10 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 3 PROPOSED TRUCK ROUTE REMOVALS
2.0—Project Description
Meridian Consultants 11 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 4 PROPOSED TRUCK ROUTES PLAN
2.0—Project Description
Meridian Consultants 12 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
FIGURE 5 PROPOSED TRUCK ROUTE PLAN AND LAND USE MAP
Meridian Consultants 23 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
3.0 ENVIRONMENTAL ANALYSIS
3.1 APPROACH
This section summarizes the conclusions of the certified EIR and then evaluates whether the proposed project would meet the conditions described in CEQA Guidelines Section 15164 for preparation of an Addendum. The net change in environmental impacts for th e approved Project (buildout of the City in accordance with the adopted General Plan including the Mobility Element) in comparison to future conditions of the City upon implementation of the proposed Project (Mobility Element Amendment) are assessed. The a pproach to this section considers the limited topics that the proposed Project could impact. The proposed project:
• Would not alter any land use designations and therefore not permit any new land uses in comparison to the existing General Plan.
• Is limited to designating truck routes and assigning weight restrictions for some roadways and modifying applicable policies and implementation actions.
A primary objective of AB 98/SB 415 is to minimize the environmental impact of logistic facilities on surrounding communities, and in particular to sensitive receptors (residential, schools, daycare, etc.). As described in Section 2.0, Project Description, the approach reviewing truck routes focused on identifying potential roadways adjacent to residential and other sensitive receptors, that currently carry truck traffic, or are anticipated to accommodate future, area-wide growth in truck volumes. The team then considered the potential to divert these truck volumes to less sensitive roadways. If appropriately designed and implemented, the truck route designations would result in beneficial impacts to operational impacts including air quality (including health risk), and noise.
3.2 ENVIRONMENTAL TOPICS DETERMINED TO HAVE “NO
IMPACT”
Implementation of the Mobility Element Amendment would not result in direct, or reasonably foreseeable indirect, physical changes to the built environment or any ground disturbance that could impact environmental resources. The proposed Project would remove existing 2016 City Truck Routes on four (4) roadways, reclassify four (4) routes from a City Truck Route to a Local Truck Route, and designate four (4) additional routes as Local Truck Routes. The proposed update to the City’s truck route designations reflects current truck activity and access to truck -generating uses while minimizing trucks on roadways with sensitive receptors. It would not involve any proposed changes such as the re-classification of arterial, collector or other road types, or right-of-way modifications.
As such, there would be no potential for impacts to any of the following resources:
• Aesthetics
Meridian Consultants 24 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Agriculture and Forestry Resources
• Biological Resources
• Cultural Resources
• Geology and Soils
• Hydrology and Water Quality
• Mineral Resources
• Population and Housing
• Public Services
• Recreation
• Tribal Cultural Resources
• Utilities and Service Systems
• Wildfire
3.3 ENVIRONMENTAL TOPICS DETERMINED TO HAVE
“LESS THAN SIGNIFICANT IMPACT”
• Hazard or Hazardous Materials
Implementation of the Mobility Element would not result in potential significant Hazard or Hazardous Materials-related impacts. The City’s 2016 Truck Route Master Plan identifies higher capacity roadways that can accommodate truck traffic and separate it from residential areas.
Currently, residential development is located along all designated truck routes. The updated City Truck Routes’ reclassification of routes from a City Truck Route to a Local Truck Route would create designated local routes for trucks to access commercial businesses and reduce neighborhood cut- through truck traffic. Thus, the risks associated with routine transport of hazardous materials may be reduced in comparison to the existing Mobility Element. Further, the General Plan contains Policy M-
5.5, which enforces established truck routes and Policy M-5.6, which establishes truck routing performance standards. Adherence to these performance standards ensures that transport of hazardous materials is routed away from residential neighborhoods to the maximum extent possible.
The Project proposes to update the General Plan Mobility Element Policy M -5.5 and Policy M-5.6 to reflect recent updates to California Government Code Sections 65098 and 65302 , which would,
Meridian Consultants 25 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
ensure that federal and state regulations continue to govern the transport, use, and disposal of hazardous materials. Accordingly, potential impacts would be less than significant.
3.4 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
Given the characteristics of the project, therefore, the following environmental analysis focuses on the following environmental topics:
• Air Quality
• Greenhouse Gas Emissions
• Land Use and Planning
• Noise
• Transportation
These topics are reviewed relative to the General Plan land uses designations within the City as well as existing, specific sensitive receptors. Whether or not the General Plan land use designation for a parcel is consistent with the existing use, the designations represent the anticipated long-term land use for each parcel. Since this Addendum analyzes the long-term potential impact of the Project and designated truck routes in comparison to buildout conditions for the existing General Plan, the land use designations are an appropriate basis for this impact analysis.
The following section is formatted to address the CEQA Appendix G checklist for the four topics listed above. A summary of the impact conclusions under the General Plan EIR for each category is also provided, along with a list of any relevant mitigation me asures included in the General Plan EIR for the respective impact.
3.5 AIR QUALITY
3.5.1 Summary of Impacts Identified in the 2013 Gener al Plan EIR
The Air Quality section of the General Plan Draft EIR concluded that the following impacts would be significant and unavoidable even with implementation of General Plan policies. No feasible mitigation measures were identified:
• Air Quality Management Plan (AQMP) Consistency: As a policy document, no development is authorized or would directly occur from the General Plan Update, however development would occur within the planning area as guided by the policies of the General
Meridian Consultants 26 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Plan Update. It was estimated that emissions resulting from buildout under the General Plan Update would exceed South Coast Air Quality Management District (SCAQMD) daily operational thresholds after the first year of growth, and emissions would continue to increase proportionally as growth occurs long -term in the City. While the SCAQMD daily thresholds are not intended to be applied to the program -level; however, they do provide a guidepost for comparing incremental increases in emissions guided by the pro gram.
Additionally, the projected population growth is not completely accommodated by the capacity of the proposed General Plan, while the projected employment growth is accommodated. Therefore, the proposed General Plan is inconsistent with the growth projections used in the RTP/SCS and would be inconsistent with the 2012 AQMP.
• Long Term Operational Related Emissions : The projected long -term net increase in emissions associated with operations under the General Plan Update would exceed the SCAQMD thresholds and therefore, mitigation measures required by SCAQMD should be implemented to the greatest extent possible. The Project emissions with the recommended mitigation measures would be reduced to an extent. However, due to the General Plan’s inconsistency with the Southern California Association of Government’s (SCAG) population growth projections for the City, the potential still remains for an interference with the implementation of the AQMP. Thus, long -term impacts to air quality remain potentially significant and unavoidable.
The Air Quality section of the General Plan Draft EIR concluded that the following impacts would be less than significant with mitigation:
• Short-Term Construction Related E missions: As a policy document, no development is authorized or would directly occur from the adoption of the General Plan Update, however development would occur within the planning area as guided by the policies of the General Plan Update. Short-term criteria pollutant emissions w ould occur during site preparation, grading, building construction, paving, and painting/coating activities. Emissions would occur from use of construction equipment, worker, vendor, and hauling trips, and disturbance of on -site soils (fugitive dust). Short-term air quality impacts would be determined on a project-by-project basis; if significant, then mitigation measures would be required by SCAQMD Rules to reduce construction emissions and to be implemented on an individual basis.
• Carbon Monoxide (CO) Hot Spots: CO hotspots are typically associated with intersections with lower ratings of Level of Services (LOS), such as LOS E or F, which indicate high congestion and high amounts of idling vehicles that have the potential to generate a CO hotspot. There is one intersection within the City currently operating at LOS E, and there are 17 intersections within the City that are anticipated to operate at LOS E or F in either or both
Meridian Consultants 27 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
of the morning or evening peak hours without implementation of recommended circulation system improvements. Pursuant to General Plan policies, future development projects would be screened and analyzed pursuant to the CO Protocol to determine if a CO hotspot may occur at congested intersections. Mitigation may be required, if necessary, to alleviate traffic congestion and minimize the hotspot potential. With implementation of the proposed General Plan Update policies to require air quality analyses and traffic Level of Service (LOS) requirements, impacts related to carbon monoxide hotspots would be less than significant.
The Air Quality section of the General Plan Draft EIR concluded that the following impacts would be less than significant with the implementation of General Plan policies and the application of standard development practices without mitigation:
• Sensitive Receptors: Emissions from future development projects would have the potential to expose sensitive receptors to temporary, localized pollutant concentrations in excess of air quality standards. General Plan policies would require preparation of an air quality impact analysis for individual development projects where possible emissions could impact sensitive receptors, and such analysis would include project -specific mitigation measures, as appropriate. Furthermore, future construction activities w ould be subject to routine control measures as required by SCAQMD as well as guidelines set forth by the California Air Resources Board (CARB). With the implementation of General Plan Policies and existing regulations, impacts would not be significant.
• Toxic Air Contaminants: The General Plan land use plan includes an Industrial Park (IP), Light Industrial (LI), and Heavy Industrial (HI) land use categories that permit varying degrees of manufacturing, processing, and distribution activities. Future businesses of these types that may be developed within the designated industrial areas could result in emissions of a variety of toxic air contaminants. CARB has developed guidelines to assist local government agencies in siting new land uses that could be oc cupied by “sensitive individuals” at a safe distance from such sources. General Plan policies for future development includes preparation of air quality analysis, which would include health risk assessments where appropriate, which would address any potential impact that could occur in the City. With implementation of proposed General Plan programs and existing regulations that regulate and monitor toxic emitters, potential health impacts to sensitive receptors due to exposure to toxic air contaminants would be less than significant.
• Odors: There are multiple existing potential sources of odors within the City, including two wastewater treatment facilities, crematoriums, as well as light and heavy industrial uses.
Future development within the area of these and other potential odor sources would have to consider potential impacts individually. Pursuant to General Plan policies, future
Meridian Consultants 28 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
development would be evaluated in regards to potential impacts related to odors. While siting is the primary mitigation to prevent exposure to odors, odors can also be mitigated in similar fashion to air pollutant emissions (i.e. filtering). Impacts related to odors w ould be less than significant with implementation of the proposed General Plan policies.
3.5.2 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Conflict with or obstruct implementation of the applicable air quality plan? b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or State ambient air quality standard?
c) Expose sensitive receptors to substantial pollutant concentrations? d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
3.5.3 Environmental Impacts
a) Conflict with or obstruct implementation of the applicable air quality plan? No Impact. The Project proposes to remove existing 2016 City Truck Routes on four (4) roadways:
Valley Boulevard (between Pepper Avenue and western City limit), Barton Road (between La Cadena Drive and I-215), Washington Street (Mt. Vernon Avenue to I-215), and Hunts Lane (Commercial Road to North City Limits) . The Project also proposes the reclassification of four (4) routes, M Street (La Cadena Drive to Mt. Vernon Avenue), Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive), Laurel Street (Pennsylvania Avenue to La Cadena Drive), and La Cadena Drive (Laurel Street to Mt. Vernon Avenue) from a C ity Truck Route to a Local Truck Route. The reclassification would restrict truck access to only trucks accessing local commercial businesses and reduce neighborhood cut-through truck traffic. Trucks currently using reclassified Local Truck Routes as cut-through to other jurisdictions would instead remain on the freeways (I-10 and I-215) to reach their destination. The Project also designates four ( 4) additional road segments as Local Truck Routes, Cooley Drive (Mt. Vernon Avenue to the driveway north of V alleywood Street), Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street), Congress Street (Fogg Street to 8th Street), and 8th Street (Congress Street to Fogg Street). The Local Truck Route designation at the four (4) new road segments formalizes truck movements already occurring to access existing local commercial businesses. Count data was collected to confirm existing truck activity. At Cooley Drive east of Mt. Vernon Avenue 414 heavy-duty trucks were recorded. The Fogg Street, Congress Street, and 8 th Street Local Truck Routes are connected, representing one corridor for commercial businesses with 208 heavy-duty trucks were recorded accessing this corridor at Fogg Street south of M Street. Trucks currently rely on these routes; the Local Truck Route designation does not create new truck demand and ensures that trucks continue to operate only on these routes to access their
Meridian Consultants 29 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
businesses rather than dispersing and cutting through on nearby neighborhood streets where children are frequently present.
The proposed Project would not result in any land use or policy changes that would result in new development or population or employment growth beyond what was projected in the City’s General Plan. The Project would not change absolute number of truck trips. The Project would reroute existing truck trips or formalize routes already containing truck traffic . This change is anticipated to result in up to 50 trucks trips a day being rerouted from a roadway with more sensitive receptors to any City Truck Route with fewer sensitive receptors, including heavy truck trips. The proposed project would not alter the significant and unavoidable impacts identified in the General Plan EIR. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or State ambient air quality standard?
No Impact. As summarized above, the proposed Project would not result in any land use or policy changes that would result in new development or population or employment growth beyond what was projected in the City’s General Plan. Similarly , the proposed Project would remove existing 2016 City Truck Routes on four (4) roadways, reclassify four (4) routes from a City Truck Route to a Local Truck Route , and designate four (4) additional routes as Local Truck Routes . Trucks currently using reclassified Local Truck Routes as cut-through to other jurisdictions would instead remain on the freeways (I-10 and I-215) to reach their destination. Newly designated Local Truck Routes are currently used by trucks to access local commercial businesses. The Project would not change absolute number of truck trips. The Project would reroute existing truck trips or formalize routes already containing truck traffic and would not result in the generation of additional vehicle trips, including heavy truck trips. As a result, there would be no increase of any criteria pollutant emissions The implementation of the proposed project would not increase or alter criteria pollutant emissions. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
c) Expose sensitive receptors to substantial pollutant concentrations? No Impact. The General Plan EIR concluded that implementation of proposed policies and programs would provide sufficient protection for sensitive receptors. As summarized above, t he proposed Project would remove existing 2016 City Truck Routes on four (4) roadways, reclassify four (4) routes from a City Truck Route to a Local Truck Route, and designate four (4) additional routes as Local Truck Routes. The Project would reroute existing truck trips or formalize routes already containing truck traffic and would not result in the generation of additional vehicle trips, including heavy truck trips.
Meridian Consultants 30 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Trucks currently using reclassified Local Truck Routes as cut-through to other jurisdictions would instead remain on the freeways (I-10 and I-215) to reach their destination. Newly designated Local Truck Routes are currently used by trucks to access local commercial businesses. Consistent with AB 98, the proposed Project would not introduce additional exposure and limit sensitive receptors (i.e. residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes. The Project would not change absolute number of truck trips. The rerouted trucks would not result in an increase of over 50 trucks trips being rerouted to any City Truck Route. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people
No Impact. The proposed project does not include any direct or reasonably foreseeable indirect physical changes to the environment or development of any new uses. The Project would reroute existing truck trips and would not result in the generation of additional vehicle trips, including heavy truck trips. The Project would not change absolute number of truck trips. The rerouted trucks would not result in an increase of over 50 trucks trips being rerouted to any City Truck Route .
There would be no construction activities that could result in odor impacts, and operational changes to truck traffic would not result in new odor generation. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
3.5.4 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR did not identify any Air Quality mitigation measures.
3.6 GREENHOUSE GAS EMISSIONS
3.6.1 Summary of Impacts Identified in the 2013 General Plan EIR
The Greenhouse Gas section of the General Plan Draft EIR concluded that the following impacts would be significant and unavoidable even with implementation of General Plan policies. No feasible mitigation measures were identified:
• Long Term Operational Related Emissions: The projected long-term net increase in greenhouse gas (GHG) emissions from future development projects would result in GHG emissions from mobile, area, and operation sources. New development in the planning area guided by the proposed General Plan Update would generate approximately 24,502 metric tons of carbon dioxide equivalent (MTCO2e) after the first year of growth and would increase additively as growth occurs over the long term. This volume of GHG emissions would exceed
Meridian Consultants 31 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
the SCAQMD interim threshold. It should be noted that the interim thresholds are not intended to be applied to the program -level, however as discussed below, the General Plan Update would be inconsistent with the CARB Scoping Plan and the Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) based on SCAG’s growth projections. • Greenhouse Gas Reduction Plans: The proposed General Plan Update supports four of the action categories, in the CARB Scoping Plan, through energy efficiency, green building, recycling/waste, and water conservation through its policies. The proposed General Plan Update would directly support the implementation of the RTP/SCS in achieving mandated GHG reduction targets through its policies. However, t he General Plan Update is not consistent with the population growth forecasts of the RTP/SCS because it does not provide the capacity for residential development to accommodate the projected population growth.
This inability to accommodate the projected population growth would indirectly generate growth elsewhere in the region and thus could potentially alter transportation plans and models of the RTP/SCS determined to achieve the noted GHG reduction targets.
The Greenhouse Gas of the General Plan Draft EIR concluded that the following impacts would be less than significant with the implementation of General Plan policies and the application of standard development practices without mitigation:
• Short-Term Construction Related Emissions: As a policy document, no development is authorized or would directly occur from the General Plan Update, however development would occur within the planning area as guided by the policies of the General Plan Update.
Construction activities are short -term and cease to emit greenhouse gases upon completion, unlike operational emissions that are continuous year after year until operation of the use ceases. General Plan policies require analysis of GHG emissions and po tential climate change impacts for future development projects.
3.6.2 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment.
b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases.
3.6.3 Environmental Impacts
a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment.
Meridian Consultants 32 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
No Impact. The Project proposes to remove existing 2016 City Truck Routes on four (4) roadways:
Valley Boulevard (between Pepper Avenue and western City limit), Barton Road (between La Cadena Drive and I-215), Washington Street (Mt. Vernon Avenue to I-215), and Hunts Lane (Commercial Road to North City Limits). The Project also proposes the reclassification of four (4) routes, M Street (La Cadena Drive to Mt. Vernon Avenue), Laurel Street (Pennsylvania Avenue to La Cadena Drive), and La Cadena Drive (Laurel Street to Mt. Vernon Avenue), and Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive) from a City Truck Route to a Local Truck Route. The reclassification would restrict truck access to only trucks accessing local commercial businesses and reduce neighborhood cut-through truck traffic. The Project also designates four (4) additional road segments as Local Truck Routes, Cooley Drive (Mt. Vernon Avenue to the driveway north of Valleywood Street), Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street) , Congress Street (Fogg Street to 8 th Street), and 8th Street (Congress Street to Fogg Street) . Count data recorded 414 heavy-duty trucks currently using Cooley Drive and 208 heavy-duty trucks using the Fogg Street/Congress Street/8th Street corridor. The Local Truck Route designation allows local trucks to continue to operate only on these routes to access their businesses rather than dispersing and cutting-through on nearby neighborhood streets where children are frequently present. The Project would not change absolute number of truck trips. The Project would not alter land uses and would not result in an increase of over 50 trucks trips being rerouted to any City Truck Route, including heavy truck trips, which could generate additional GHG emissions. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project. b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases.
No Impact. As summarized above, t he proposed Project would reroute existing truck trips or formalize routes already containing truck traffic and would not result in an increase of over 50 trucks trips for any City Truck Route, including heavy truck trips, and would not result in any land use or policy changes that would result in new development or population or employment growth beyond what was projected in the City’s General Plan . No change in the level of significance, identified in the Certified EIR, would occur through operation of the proposed Project.
3.6.4 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR did not identify any Greenhouse Gas mitigation measures.
3.7 LAND USE & PLANNING
Summary of Impacts Identified in the 2013 General Plan EIR All of the potential Land Use and Planning impacts were determined to be Less Than Significant upon implementation of General Plan policies without Mitigation.
Meridian Consultants 33 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
• Physically Divide an Established Community: According to the 2013 General Plan EIR, the proposed Circulation Element would not establish any new transportation routes or facilities.
No other types of major corridors are planned that would require clearing of existing land uses. The proposed General Plan supports maintenance of established neighborhoods through the General Plan Land Use (LU) Policies, including Policy LU-1.6, LU-1.9, LU-6.1, LU-
6.2, LU-6.3, LU-6.4, and LU-6.5. With the implementation of the proposed LU policies , no impact would occur.
• Conflict with Applicable Land Use Plans, Policies, or Regulations: According to the 2013 General Plan EIR, the planning area is subject to a variety of federal, State and locally adopted plans designated to mitigate environmental impacts and preserve important resources. The 2013 General Plan EIR concluded that applicable land use plans, policies, and regulations would have a less than significant impact.
• Conflict with Any Applicable Habitat or Natural Community Conservation Plan: The 2013 General Plan EIR identified that portions of the City are located within Recovery Units of the adopted Delhi -Sands Flower -Loving Fly Recovery Plan . The City is not within any other adopted habitat conservation plan or natural community conservation plan. As discussed in the 2013 General Plan EIR’s Biological Resources section, t he Recovery Units of the Delhi - Sands Flower-Loving Fly Recovery Plan is designated as open space. Thus, it supports the objectives of the plan, and would have no effect upon the plan.
3.7.1 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Physically divide an established community?
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
3.7.2 Environmental Impacts
a) Physically divide an established community?
No Impact. As described above, the updated City Truck Routes’ reclassification of routes from a City Truck Route to a Local Truck Route would create designated local routes for trucks which maintain access to commercial businesses and reduce neighborhood cut-through truck traffic. The introduction of additional Local Truck Routes formally establishes routes trucks already use d to access local businesses while reducing surrounding neighborhood cut-through truck traffic on roadways where children are frequent ly present. The Project’s reclassification and designation of Local Truck Routes would not physically divide an established community. The Project’s reduction of neighborhood cut-through truck tr affic would improve the surrounding residential areas.
Meridian Consultants 34 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Furthermore, the Project proposes to update the General Plan Mobility Element Policy M -5.5 and Policy M -5.6, which would improve residential neighborhood conditions. Policy M-5.5 enforces established truck routes, in order to discourage truck shortcuts through residential neighborhoods.
Policy M -5.6 includes performance criteria for designated truck routes , which includes avoiding intrusions into residential neighborhoods. Thus, implementation of the Project would not physically divide an established community and would improve residential areas with compliance to AB 98 and SB 415. No impact would occur.
b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
No Impact. The Project would not conflict with any land use plan, policy or regulation adopted for the purpose of mitigating an environmental impact. As described above, the Project proposes to update the Mobility Element of the General Plan and amend Chapter 10.60 (2016 Truck Routes Master Plan) to Title 10 of the Colton Municipal Code in order to comply with AB 98/ SB 415. The Project’s reclassification of routes, designation of additional Local Truck Routes, and General Plan Mobility Element updates would minimize environmental impacts to local communities. The Local Truck Routes are aimed at reducing neighborhood cut-through truck traffic while maintaining truck access to local commercial businesses. The Project proposes to update the General Plan Mobility Element Policy M -5.5 and Policy M -5.6 to reflect recent updates to California Government Code Sections 65098 and 65302. Implementation of the Project would ensure compliance with AB 98 and SB 415 and would not conflict with any land use plans, policies or re gulations. No impact would occur.
3.7.3 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR did not include any Land Use and Planning mitigation measures.
3.8 NOISE AND VIBRATION
3.8.1 Summary of Impacts Identified in the 2013 General Plan EIR
The Nosie section of the General Plan Draft EIR concluded that the following impacts would be Less Than Significant upon implementation of General Plan policies without Mitigation. • Construction Noise: As a policy document, no development is authorized or would directly occur from the adoption of the General Plan Update, however development that would occur within the planning area as guided by the policies of the General Plan Update. Grading,
Meridian Consultants 35 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
paving, landscaping and building construction processes involve equipment and vehicles that are known to produce intrusive levels of noise. This would result in temporary increase in local noise levels near the active construction sites that could adversely affect neighboring land uses, particularly those where sensitive receptors are located. Continuing enforcement of the Municipal Code would reduce potential nuisance noise impacts. • Traffic Noise: Future population and employment growth within the planning area would result in increased traffic and the need for roadway and intersection improvements necessary to maintain desired levels of service. Increases in traffic could result in permanent increases in ambient noise levels, e.g., where a roadway segment is proposed to be expanded with additional travel lanes over the long-term to achieve level of service standards. Roadway noise could also increase on an existing roadway that would carry increasing traffic volumes.
In either set of circumstances, roadway noise levels could increase to beyond the levels considered acceptable for the adjacent land uses as defined by the City of Colton Noise Guidelines. Potential increases in noise levels along existing and proposed roadways would be assessed in conjunction with the City’s review of site-specific noise impact analyses. • Vibration: Development that would occur within the planning area as guided by the policies of the General Plan Update has the potential to generate perceptible vibration levels to sensitive receptors within 20 feet from the operation of heavy equipment. The proposed General Plan Update does not authorize any construction or other land altering activity that could result in construction-related vibration. Potential vibration due to future construction activities would be assessed in conjunction with the City’s routine review of site -specific geotechnical studies and the recommended grading and foundation design measures.
The Nosie section of the General Plan Draft EIR concluded that th ere would be no impacts with implementation of General Plan policies:
• Airport Noise: The City of Colton is not located within an airport land use plan area or within two miles of a public airport or private airstrip. The nearest airport is the San Bernardino International Airport is located approximately three miles east of Colton. The City is not located within the 65 dBA contour map for the San Bernardino International Airport. As such, the proposed project would not expose residents or workers within two miles of an airport to excessive noise levels associated with air traffic.
3.8.2 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan
Meridian Consultants 36 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
or noise ordinance, or applicable standards of other agencies? b) Generation of excessive groundborne vibration or groundborne noise levels? c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the p roject area to excessive noise levels?
3.8.3 Environmental Impacts
a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less than Significant Impact. Since the proposed project would not involve any new development, there would be no potential for substantial temporary or permanent noise levels related to construction activities. There would also be no noise generation changes with operations associated with development since there would be no land uses changes.
The potential for noise changes due to the proposed project would be limited to traffic noise, and in particular truck-related noise. Implementation of the proposed designated truck routes would be expected to reduce truck traffic along the following roadway segments within residential areas where 2016 City Truck Routes have been proposed for removal:
• Valley Boulevard (between Pepper Avenue and western City limit) • Barton Road (between La Cadena Drive and I-215)
• Washington Street (Mt. Vernon Avenue to I-215)
• Hunts Lane (Commercial Road to North City Limits)
The Project also proposes to reclassify routes from a City Truck Route to a Local Truck Route. The reclassification would create designated local routes for trucks to access commercial businesses and reduce neighborhood cut-through truck traffic. The following 2016 City Truck Routes are proposed to be reclassified as Local Truck Routes:
• M Street (La Cadena Drive to Mt. Vernon Avenue)
• Valley Boulevard (Rancho Avenue to its eastern terminus at Sperry Drive) • Laurel Street (Pennsylvania Avenue to La Cadena Drive) The removal of La Cadena Drive (Laurel Street to Mt. Vernon Avenue) as a Truck Route would restrict through trucks from using reclassified Local Truck Routes as cut-through to other jurisdictions and
Meridian Consultants 37 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
would require them to instead remain on the freeways (I -10 and I -215) to reach their destination.
Noise levels on the aforementioned Truck Routes would be reduced consistent with the reduction of truck traffic along these routes. The rerouting of existing truck traffic would result in no more than 50 truck trips per day being rerouted to the proposed Truck Routes.
The following additional routes are to be designated as Local Truck Routes:
• Cooley Drive (Mt. Vernon Avenue to the driveway north of Valleywood Street) • Fogg Street (Jefferson Lane to Congress Street and Congress Street to M Street) • Congress Street (Fogg Street to 8th Street)
• 8th Street (Congress Street to Fogg Street)
Count data recorded 414 heavy-duty trucks currently using Cooley Drive and 208 heavy-duty trucks using the Fogg Street/Congress Street/8 th Street corridor. The truck volumes at the aforementioned routes would be maintained with the truck route designation. Existing truck traffic rerouted to these routes would originate from other local -serving trucks accessing commercial businesses on other neighborhood streets fronted by a park and an elementary school . The rerouting of existing truck traffic would result in no more than 50 truck trips per day being rerouted to Local Truck Routes.
According to standard traffic noise modeling methodology (FHWA), a doubling in traffic volume results in an increase of approximately 3 dBA in roadway noise levels. 1 A 3 -dBA increase is considered a noticeable but marginal increase in noise and is at the threshold of perceptibility for most people. The rerouting of existing truck trips would not result in a doubling of traffic volumes on any of the Truck Routes. Any increases in noise levels would be negligible. Further, the proposed Truck Routes would be consistent with AB 98 requirements and would establish designated truck routes where properties fronting these roads at least 50 percent commercial and industrial, thereby limiting sensitive receptors (i.e. residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project. b) Generation of excessive groundborne vibration or groundborne noise levels?
1 Federal Highway Adminstration, Highway Traffic Noise: Analysis and Abatement Guidance, https://www.fhwa.dot.gov/environment/noise/regulations_and_guidance/analysis_and_abatement_guidance/revguidance.pdf . Accessed November 2025.
Meridian Consultants 38 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
Less than Significant Impact. Since the proposed project would not involve any new development, there would be no potential for substantial temporary or permanent excessive groundborne vibration. As discussed above, the potential for vibration changes due to the proposed project would be limited to traffic vibration, and in particular truck -related vibration. According to the F ederal Transit Administration,2 typical road traffic–induced vibration levels are unlikely to be perceptible by people. Trucks and buses typically generate ground-borne vibration velocity levels of approximately 63 VdB (at a 50-foot distance). The Project would not change the absolute number of truck trips. The rerouting of existing truck traffic would result in no more than 50 truck trips per day being rerouted to the proposed Truck Routes. The rerouting of existing truck trips would not result in a doubling of traffic volumes on any of the Truck Routes. Any increases in vibration levels would be negligible. Further, the proposed Truck Routes would be consistent with AB 98 requirements and would establish designated truck routes where propert ies fronting these roads at least 50 percent commercial and industrial, thereby limiting sensitive receptors (i.e. residences, schools, daycare facilities, parks and playgrounds, nursing homes, and hospitals) along truck routes. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
No Impact. The proposed Project does not include any development and would not expose people residing or working in the project area to airport noise. No change in the level of significance, identified in the General Plan EIR, would occur through operation of the proposed Project.
3.8.4 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR did not identify any Noise mitigation measures.
2 Federal Transit Administration. Transit Noise and Vibration Impact Assessment, FTA report no. 0123. September 2018 https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/research-innovation/118131/transit-noise-and-vibration-impact- assessment-manual-fta-report-no-0123_0.pdf. Accessed November 2025.
Meridian Consultants 39 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
3.9 TRANSPORTATION /TRAFFIC
3.9.1 Summary of Impacts Identified in the 2013 General Plan EIR
The Transportation section of the General Plan Draft EIR concluded that the following impacts would be Significant and Unavoidable even with implementation of General Plan policies. No feasible mitigation measures were identified:
• Individual and Cumulative Level of Service Standards and Traffic Load and Capacity: The 2013 General Plan EIR identified that with the intensities of development associated with the General Plan Update, nineteen (19) study intersections would operate at a deficient level of service (LOS) F . Conditions following the intersections would worsen to LOS F , or compound to worse LOS F operations, in the future due to long -term implementation of General Plan land use policies and new development, including the West Valley Specific Plan area and in the Pellissier Ranch/La Loma Hills area. Therefore, long-term implementation of the General Plan Update land use policy, in combination with regional contributions to traffic on the local road network, would result in significant and avoidable impacts to LOS standards and traffic load and capacity.
The Transportation and Traffic of the General Plan Draft EIR concluded that the following impacts would be Less Than Significant with the implementation of General Plan policies and Without Mitigation:
• Air Traffic Patterns, Traffic Levels, or Location: According to the 2013 General Plan EIR, future development proposed pursuant to the General Plan Update would not affect air traffic patterns due to Colton’s distance from Ontario International Airport. Therefore, impacts on air traffic patterns would be less than significant and no mitigation is required. • Design Features or Incompatible Uses: According to the 2013 General Plan EIR, intent of the Mobility Element includes provision of safe traffic conditions citywide, for all mobility modes. Therefore, the General Plan Update would include Policy M-1.2, M-3.2, M-3.6, and M-
4.1. With implementation of the proposed Mobility Element policies, street improvements would be designed in accordance with all applicable standards relating to vehicle traffic, bicycles, and pedestrian safety. Impacts would be less than significant and no mitigation is required.
• Emergency Access: According to the General Plan EIR, future development of the General Plan Update would be subject to the provisions of the City’s Fire Code with regard to providing adequate emergency access. The General Plan Update does not include policies that would
Meridian Consultants 40 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
change standards to emergency access or interfere with policy implementation. Therefore, impacts would be less than significant and no mitigation is required. • Parking Capacity: According to the 2013 General Plan EIR, the General Plan Update supports provision of adequate parking in future developments through Policy M-6.1 thru M-6.6.
Through implementation of these policies, in conjunction with the parking supply and design standards of the City’s Zoning Code, impacts to adequate parking would be less than significant. No mitigation is required.
• Adopted Policies, Plans, or Programs : According to the 2013 General Plan EIR, the General Plan Update would not interfere with any adopted plan or policy related to alternative transportation. The General Plan Update would include Policies M-1.1 through M-1.5, Policies M-2.1 through M-2.14, and Policy M-3.8, which would support alternative modes of transportation including public transit, bicycling, and walking. Additionally, the proposed Complete Streets Plan would promote development of street design that can accommodate diverse travel modes. Therefore, no adverse impact to alternative transportation plans, programs, or facilities would occur and impacts would be less than significant. No mitigation is required.
3.9.2 Thresholds of Significance
The Mobility Plan Update could result in a significant impact if it:
a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)? c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? d) Result in inadequate emergency access?
3.9.3 Environmental Impacts
a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? No Impact. In compliance with AB 98, the proposed project is an update to the General Plan Mobility Element. As described in Section 2.0, Project Description, the project complies with this legislation.
The project, including the designation of truck routes and weight restricted routes, would not conflict with any policies, plans or programs for transportation. b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)? No Impact . The General Plan EIR evaluated potential level of service impacts to the City’s transportation network but did not analyze potential Vehicle Miles Traveled (VMT) with and without
Meridian Consultants 41 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
the project. On September 27, 2013, SB 743 was signed into law and started the process to eliminate auto delay, level of service (LOS) and traffic congestion as the basis of determining significant impacts under CEQA. The Governor’s Office of Planning and Research developed alternative metrics and thresholds based on VMT. The guidelines were certified by the Secretary of the Natural Resources Agency in December 2018, and automobile delay, as described solely by level of service— or similar measures of vehicu lar capacity or traffic congestion —is not considered a significant impact on the environment. There was an opt-in period until July 1, 2020, for agencies to adopt new VMT-based criteria. The City of Colton published VMT Guidelines for General Plan Compliance analysis and CEQA VMT Analysis in June 2020.
The proposed project would not alter land uses and therefore would not change truck volumes as a whole, but rather shift no more than 50 truck trips onto parallel routes. Route changes as a result of designated truck routes and weight restrictions could affect the distance of some truck travel. This would be anticipated to be minimal. Regardless, the VMT methodology does not include heavy trucks. The model includes total VMT per capita for residential projects and VMT per employee for office and industrial projects. The proposed project would not impact VMT. c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? No Impact . The proposed project does not include circulation network modifications or improvements. Implementation would not result in impacts related to traffic hazards. d) Result in inadequate emergency access?
No Impact . The proposed project does not include circulation network modifications or improvements. The proposed Project would remove existing 2016 City Truck Routes on four (4) roadways and would, reclassify two four (24) routes from a City Truck Route to a Local Truck Route, and designate four (4) additional routes as Local Truck Route s. The Project would not change the absolute number of truck trips. The rerouting of existing truck traffic would result in no more than 50 existing truck trips per day bein g rerouted to the proposed Truck Routes and would not result in a significant increase of trips on designated evacuation routes. Implementation would not result in impacts related to emergency access.
3.9.1 Adopted Mitigation Measures Applicable to the
Proposed Project
The General Plan EIR includes mitigation measures to address the LOS impacts of implementing the General Plan. These measures are not applicable to the proposed Mobility Element update.
Meridian Consultants 42 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
4.0 FINDINGS
As summarized below, and for the reasons described in Section 3, Environmental Analysis, of this Addendum, the City of Colton has concluded that the proposed project meets the conditions of CEQA Guidelines Section 15164 and that therefore an Addendum to the certified EIR is the appropriate CEQA document to address the proposed project.
As previously discussed, under CEQA Guidelines Section 15164, an addendum to an EIR or MND may be prepared if only minor technical changes or additions are necessary or none of the conditions described in CEQA Guidelines Section 15162 calling for the preparation of a subsequent EIR or MND have occurred. The following restates the standards set forth in CEQA Guidelines Section 15162 as they relate to the proposed project.
1. No substantial changes are proposed in the project which would require major revisions of the previous EIR due to the involvement of new significant environmental effect or a substantial increase in the severity of previously identified significant effect.
The proposed project, the General Plan Update, is a focused effort undertaken specifically to comply with 2023 California legislation, AB 98 (and associated cleanup legislation enabled by SB 415). A primary objective of AB 98 is to minimize the environment al impact of logistic facilities on surrounding communities, and in particular to sensitive receptors (residential, schools, daycare, etc.). As summarized in Section 3.0, Environmental Analysis, The proposed project:
• Would not alter any land use designations and therefore not permit any new land uses in comparison to the existing General Plan.
• Is limited to designating truck routes and assigning weight restrictions for some roadways and modifying applicable policies.
As detailed in the Environmental analysis, Implementation of updated General Plan would not involve any new significant environmental effects or substantially increase the severity of any previously identified significant impact. On the contrary, the analy sis in this Addendum demonstrates that potential beneficial environmental impacts anticipated due to the proposed project.
2. No substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
Meridian Consultants 43 AB 98 Mobility Element Update
November 2025 City of Colton
23152.06300\44427883.1
This Addendum evaluates the potential incremental effects of the proposed project in comparison to baseline environmental conditions (buildout of the City in accordance with the 2013 General Plan).
There have been no substantial changes in circumstances since preparation of the General Plan EIR that would require major revisions to the EIR due to the involvement of new significant impacts or substantial increase in the severity of impacts previously identified.
3. No new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
a. The project will have one or more significant effects not discussed in the previous EIR or negative declaration
There have been no changes of substantial importance that would result in one or more significant effects not discussed in the original General Plan EIR. The proposed project would not result in any new significant effects relative to the original General Plan EIR. b. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
This Addendum reviews all environmental topics for the proposed project’s potential impacts. The project would result in beneficial impacts and would not result in any impacts more severe than the original General Plan EIR. c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
The proposed project would result in beneficial impacts to some categories and not affect the majority of impact categories. Implementation would not result in more severe impacts than the original General Plan EIR and no additional mitigation measures or alternatives were considered.
d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
See Response to condition C. No additional mitigation measures or alternatives were required or considered.
Exhibit A-2
of Ordinance #O-10-25
Title 10 - VEHICLES AND TRAFFIC
Chapter 10.60 DESIGNATED TRUCK ROUTES
Colton, California, Code of Ordinances
(Supp. No. 39)
Chapter 10.60 DESIGNATED TRUCK ROUTES
10.60.010 Title.
This Chapter shall be known as the Truck Route Ordinance. The City of Colton hereinafter shall be called "City." This Chapter shall be applicable in the incorporated territory of the City. (Ord. No. O-20-16, § 1, 10-18-2016)
10.60.020 Designated.
A. The use of all streets within the City by any vehicle exceeding a gross weight of six fourteen thousand pounds, except upon the Truck Routes specified in the City of Colton General Plan Mobility ElementSection
10.60.020(B) is prohibited. A vehicle in excess of six fourteen thousand pounds up to a maximum of fourteen thousandeighty thousand pounds, including its load, may utilize the streets and portions of streets designated as Truck Routes. Except as otherwise provided in Section 21101 et seq. and Section 35701 et seq. of the California Vehicle Code, no vehicle in excess of fourteen eighty thousand pounds, including its load, shall utilize the streets and portions of streets designated as Truck Routes. Streets designated as Local Truck Routes in the City of Colton General Plan Mobility Element shall only be used by local businesses. Through truck traffic is not permitted on Local Truck Routes.
B. The specified portions of the following public streets are hereby designated as "Truck Routes."
1. Mt. Vernon Avenue (Washington Street to North City Limits)
2. Laurel Street (Pennsylvania Avenue to La Cadena Drive)
3. La Cadena Drive (Laurel Street to Mt. Vernon Avenue)
4. Colton Avenue (Mt. Vernon Avenue to East City Limits)
5. Fairway Drive (Mt. Vernon Avenue to East City Limits)
6. Valley Boulevard (within Colton City Limitsbetween Pepper Avenue and western City limit and between Rancho Avenue and its eastern terminus at Sperry Drive)
7. Pepper Avenue (within Colton City Limits)
8. La Cadena Drive (Valley Boulevard to South City Limits)
9. Agua Mansa Road (West City limits to Rancho Avenue)
10. Riverside Avenue (within Colton City Limits)
11. Iowa Avenue (La Cadena Drive to South City Limits)
12. M Street (La Cadena Drive to Mt. Vernon Avenue)
13. Barton Road (within Colton City Limitsbetween La Cadena Drive and I-215)
14. Washington Street (Mt. Vernon Avenue to East City Limits I-215)
15. Hunts Lane (Washington Street Commercial Road to North City Limits)
16. Rancho Avenue (La Cadena Drive to Agua Mansa Road)
Exhibit-A-2 Amendments to
Chapter 10.60 of C.M.C.
of Resolution No. R-27-25
Formatted: Highlight
Formatted: Highlight
Formatted: Highlight
Formatted: Highlight
(Supp. No. 39)
CB. The following street segment is proposed for restrictions to allow only trucks with a kingpin -to-rear-axle (KPRA) length of twenty-six feet or less:
1. Rancho Avenue (Valley Boulevard to Agua Mansa Road)
(Ord. No. O-20-16, § 1, 10-18-2016)
City of Colton
AB 98 Mobility
Element Update
City Council Meeting
December 2, 2025
Basis for the GPA: AB 98 & SB 41 5
State law (Assembly Bill 98 and Senate Bill 41 5)
- AB 98 passed September 30, 2024
- SB 41 5 passed on October 3, 2025
Legislative objectives
- Designate truck routes in all California jurisdictions with Logistics Uses - Minimize the impact of heavy - duty trucks on sensitive receptors - Install “conspicuous” truck route, truck parking, and truck idling locations signage
- Maintain safe and efficient movement of goods
- Enforce approved truck routes
C olton AB 98 | S B 415 Mobility E lement U pdate
Warehouse C oncentration Region (W C R)
Deadline for compliance
January 1 , 2026
WCR Jurisdictions:
Unincorporated San Bernardino County
Unincorporated Riverside County
City of Chino City of Rancho Cucamonga
City of Colton City of Redlands
City of Fontana City of Rialto
City of Jurupa Valley City of Riverside
City of Moreno Valley City of San Bernardino
City of Ontario
City of Perris
*Cities of Loma Linda and Grand Terrace are only
required to adopt a truck route ordinance by
January 1 , 2030 if they plan to approve a logistics
use.
Legislative Requirements
Warehouse Concentration Region Checklist
Update General Plan to Incorporate Designated Truck Routes:
Review and update truck routes to avoid sensitive receptors where feasible Engage the community when updating truck routes
Coordinate truck route changes with adjacent jurisdictions Update code definitions and provisions in Senate Bill 41 5 (covered in Title 1 8 Zoning Code Amendment):
Zoning code requirements for logistics uses (250 ksf and up warehouses) Incorporate siting and design standards for logistics uses C olton AB 98 | S B 415 Mobility E lement U pdate
C onsiderations in Updating T ruck R outes
C olton AB 98 | S B 415 Mobility E lement U pdate
As required by State law (GOV CODE 65302.02)
- Ensure efficient and safe routes for goods movement
- Maximize the use of freeways, highways, and major roadways (arterials/collectors) - Local roads acceptable when properties fronting roadway are at least 50% commercial or industrial - Minimize exposure of sensitive receptors to truck routes - Engage the community to obtain input
Federal law (23 CFR 658.1 9(a))
- Regardless of State or County truck route designations, federal law allows heavy duty trucks to travel along local roads when necessary to serve businesses and obtain food/rest/repairs by the safest and most practical route
C ommunity Engagement
C olton AB 98 | S B 415 Mobility E lement U pdate
Online Survey Tool:
• English & Spanish Materials
• Community Survey Tool
• Website Materials
Community Engagement:
• 1 0/28 PC Workshop
• 1 1 /3 Public Meeting/Open House
• Coordination with S taff at Adjacent
Agencies
• 11/ 11 P C R e c o m m e n d a t i o n
• 1 1 /1 3 Reche Canyon Ad Hoc Meeting
General Plan Goods Movement Map (Figure M-8)
Recommended Title 1 0, Chapter 1 0.60 Updates
C olton AB 98 | S B 415 Mobility E lement U pdate
Title 1 0, Chapter 1 0.60 Changes:
• Truck routes will now be mapped and governed through the Mobility Element rather than by ordinance in Chapter 1 0.60.
• Chapter 1 0.60: “The use of all streets within the City by any vehicle exceeding a gross weight of six fourteen thousand pounds, except upon the Truck Routes specified in the City of Colton General Plan Mobility Element S ection 1 0.60.020(B) is p rohib ite d .” • Define L ocal Truck Routes: “ Streets designated as Local Truck Routes in the City of Colton General Plan Mobility Element shall only be used to access local businesses. Through truck traffic is not permitted on Local Truck Routes.”
• Re m ove d e xp lic it d e sig nation of truc k route s, whic h will b e shown in Mob ility Ele m e nt.
Existing Truck
R outes (201 6 T itle
1 0 Amendment)
Recommended
Truck Route
Remo val s
City Truck Route
Adjacent Jurisdiction Truck Route
Proposed Truck Route Removal
National Highway Freight Network
G eneral Plan Mobility Element Updates
C olton AB 98 | S B 415 Mobility E lement U pdate
Changes to Page M - 47:
• Designates routes pursuant to SB 41 5
• Lists truck routes in the General Plan Mobility Element • Adds truck route map to Mobility Element
• Creates a GIS truck route map for dissemination to facility operators and truck drivers • Adds a definition for “ Local Truck Routes” to Chapter 1 0.60 • “Local truck routes provide access to businesses that require use of local roadways to access existing industrial uses.”
• Recommends removal of current truck routes
• V al l ey B oul evard (Pepper A venue to R ancho A venue) • Washington/Barton east of I - 21 5 and Hunts L ane (south of Commercial Road) • Recommends designation of Local Truck Routes
• Changes three current truck routes to local serving only (Valley, M St, Laurel/ L aCadena) • A dds L ocal Truck A ccess Onl y to Fogg Street/8 th Street/Congress Street and Cool ey Dri ve
Proposed T ruck
Ro ut es
G eneral Plan Addendum
C olton AB 98 | S B 415 Mobility E lement U pdate
Key Findings:
• The environmental analysis
determined that the Project will not
result in additional impacts
• No additional mitigation measures
beyond those included in the
certified General Plan EIR are
required
• The EIR Addendum is included within
each of the recommended actions.
C olton AB 98 | S B 415 Mobility E lement U pdate
R ecommended Actions:
01 02
A dopt Resolution R-93-25 for A pproval of the G eneral Plan EIR A ddendum & approval of updated Tr u ck Ro u t e s , Tr u ck Ro u t e Ma p , and policies to the Mobility E lement; and A dopt Ordinance O-10-25 to Wa ive full reading, read by Title only and I ntroduce Ordinance No. O-10-25
A pproving G eneral Plan EIR A ddendum & Ame n d in g and updating Cha p t e r 10. 60 , Designated Tru ck Ro u t e s of Title 10 of the C olton Municipal Co d e.
Item: 1.
Staff Report
Meeting Date: December 2, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Isaac T. Suchil, City Clerk
Item Name: Minutes - Approval of Minutes for the City Council Regular Meetings Held on November 04, 2025, and on November 18, 2025; on File in the Office of the City Clerk.
Recommended Action:
Approval of Minutes for the City Council Regular Meetings Held on November 04, 2025, and November 18, 2025.
Background:
Minutes for the City Council regular meetings held on November 04, 2025 and November 18, 2025.
Issues/Analysis:
N/A
Fiscal Impacts:
N/A
Alternatives:
N/A
Attachments:
1. 2025-11-18- Draft Minutes
2. 2025-11-04- Draft Minutes
City of Colton
City Hall, Council Chambers
650 N. La Cadena Drive
Colton, CA 92324
City of Colton Website
Mayor Frank J. Navarro
Council Members:
David J. Toro – District 1
Kelly J. Chastain – District 2
Dr. Luis S. González – District 3
John R. Echevarria – District 4
City Clerk Isaac T. Suchil
City Treasurer Henry M. Razo
City Manager William R. Smith
City Attorney Carlos Campos
Minutes
City Council
Colton Utility Authority, Colton Public Financing Authority Colton Housing Authority
Regular Meeting
Tuesday, November 18, 2025 – 5:00 PM
City Hall, Council Chambers
Closed Session
5:00 p.m.
Closed Session Called to Order
Closed Session meeting was called to order at 5:00 P.M. in the Council Chamber of City Hall, with Mayor Frank J. Navarro presiding.
Roll Call
Council members present were Frank J. Navarro, David Toro, Kelly Chastain, Luis S. González, John Echevarria; also present was the City Clerk, Isaac T. Suchil.
Staff present was William R. Smith, City Manager and Carlos Campos, City Attorney. _____________________________________________________________________________________
______________________________________________________________________________ Public Comment - Closed Session
No public comment cards were submitted.
Closed Session
City Attorney Carlos Campos announced the City Council would meet in Closed Session to discuss Items 1 through 4.
1) Conference with Legal Counsel - Existing Litigation
Pursuant to Government Code Section 54956.9(d)(1)
Colton Housing Group LLC et al. v. City of Colton et al. San Bernardino County Superior Court Case No. CIVSB2521712.
2) Conference with Legal Counsel – Anticipated Litigation Significant Exposure to Litigation Pursuant to Government Code Section 54956.9(d)(2)/(e)(1)
One (1) Potential Case
3) Conference with Legal Counsel - Existing Litigation
Pursuant to Government Code Section 84956.9(d)(1)
City of Colton et al. v. Inland Memorial Inc. Cremation and Burial Society Inc.; Inland Memorial Inc.
San Bernardino Superior Court, Case No. CIVSB2300169
4) Public Employee Performance Evaluation
Job Titles: City Attorney & City Manager
City Attorney Oral Report on Closed Session Actions
City Attorney Campos announced that the City Council met in Closed Session and discussed Closed Session Items 1 through 3; direction was given but there was no reportable action.
Campos also reported that Closed Session Item #4 was not discussed but was continued and would be discussed at the next regular council meeting in Closed Session. _____________________________________________________________________________________
____________________________________________________
Open Session
6:00 P.M.
Open Session Called to Order
Mayor Frank J. Navarro called Open Session to order at 6:00 P.M.
Invocation
Pastor Don Duenez - Echoes of Love Church
Flag Salute
U.S.M.C Veteran – Tom Leon
Roll Call
Council members present were Frank J. Navarro, David Toro, Kelly Chastain, Luis S. González, and John Echevarria.
Also present was the City Clerk, Isaac T. Suchil; City Treasurer Heney M. Razo was not present.
Staff present were William R. Smith, City Manager and Carlos Campos, City Attorney.
Ceremonial Matters
Presentations, Awards, Proclamations
• Business Focus - Pizzadilly
Councilmember Gonzalez presented a Business Focus recognition certificate to owners Sherwin and Denise Marioano on behalf of the Mayor and City Council. • Proclamation - Small Business Saturday
Mayor Frank J. Navarro presented a proclamation declaring Saturday, November 29, 2025, Small Business Saturday. Mayor Navarro presented the proclamation to the Chamber of Commerce Board Members who were present:
o Christina Gaitan – Chamber Coordinator
o Shelley Burnach – Chamber Board Vice President
o Anna Juarez – Chamber Board Member
o Belen Cordero – Chamber Board Member
o Nelky Rodriguez – Chamber Board Secretary
o Frank Aguilar – Chamber Board Member
______________________________________________________________________________
Mayor and Council Items
Gift Disclosures
None were disclosed.
AB 1234 Oral Reports
City Clerk, Isaac T. Suchil, reported that he attended the League of CA Cities' New Law and Elections Seminar at the city’s expense, which took place on November 12-14, 2025, in Los Angeles.
Appointments
None
Mayor and Council Discussion Items
None
_____________________________________________________________________________ Public Hearings
There were no Public Hearing Items.
Business Items
1) Ordinance Increasing City Council Compensation - Waive Full Reading, Read by Title Only, and Pass First Reading of an Ordinance of the City Council of the City of Colton, California, Amending Colton Municipal Code Sections 2.12.030 and 2.12.050 Increasing City Council and Mayor Compensation, Ordinance No. O-11-25.
Staff Person: Bill Smith
Staff Presentation
City Manager, William R. Smith, presented for Council an overview of the agenda item.
Public Comment
The following community members addressed the Council:
• Gary Grossich, Colton Business Owner
Council Discussion
None
Motion/Vote
A motion was made by CM Chastain, with a second by MPT Echevarria, to waive full reading, read by title only, and approve Ordinance No. O-11-25.
Vote: Motion passed with Mayor Navarro and Council member González voting no.
Public Comment - Limit 3 Minutes
The following community members addressed the Council:
• Christine Gaitan, Colton Resident & Chamber Coordinator • Eugene Valdez, Colton Business Owner
Consent Calendar
Mayor Navarro presented the Consent Calendar Items 1 through 9.
Motion/Vote
A motion was made to approve the Consent Calendar by MPT Echevarria, with a second by CM Gonzalez.
Vote: Unanimous, Motion Passed
1) Warrants - Approve voucher numbers 222274 to 222401 dated 10/16/2025 and totaling $2,180,143.59; voucher numbers 222402 to 222524 dated 10/23/2025 and totaling $1,200,972.76; wires totaling $3,982,146.15; and a payroll disbursement listing dated 09/27/2025 to 10/10/2025 and totaling $1,689,223.02.
Staff Person: Stacey Dabbs
2) Contract Amendment - OMNI Cemetery Management - Approve Third Contract Amendment for OMNI Cemetery Management and Budget Adjustment, for Management of Hermosa Gardens Cemetery.
Staff Person: Deb Farrar
3) Contract Award - Compressed Air Specialties - Award Contract to Compressed Air Specialties for Self-Contained Breathing Apparatus (SCBA) Fill Station Replacement in the Fire Department.
Staff Person: Ray Bruno
4) Grant - Yuhaaviatam Nation - Approve a Resolution Accepting the Community Risk Assessment Grant from the Yuhaaviatam Nation and Amend the FY25/26 Budget to Account for the Receipt of Funding, Resolution No. R-88-25.
Staff Person: Ray Bruno
5) MOU - CPMA - Approve and Adopt the Memoranda of Understanding and Resolution with the City of Colton and the Colton Police Management Association (CPMA), Resolution No. R-87-25.
Staff Person: Thomas Cody
6) MOU - CPOA - Approve and Adopt the Memoranda of Understanding (MOU) and Resolution with the City of Colton and the Colton Police Officers Association (CPOA), Resolution No. R-86-25.
Staff Person: Thomas Cody
7) Notice of Completion - Fiscal Year 2024-25 Slurry Seal Project - Approve the Execution and Recordation of the Notice of Completion for the Fiscal Year 2024-25 Slurry Seal Project.
Staff Person: Chad Blais
8) Set Public Hearing - Right-of-Way Vacation - Set Public Hearing Date of December 16, 2025 to Approve the following Resolution of Intention to Vacate Certain Portions of Right- of-Way, the full width of the alley north of Valley Boulevard, from Mt. Vernon Avenue to 280 feet west of Mt. Vernon Avenue, and certain portions of right-of-way, approximately 234 square feet, on the west side of Mt. Vernon Avenue, north of Valley Boulevard, Resolution No. R-90-25.
Staff Person: Chad Blais
9) Utility Relocation Agreement - SCE - Approve a Utility Relocation Agreement with Southern California Edison (SCE) for the Barton Road Bridge Removal and Road Construction Project.
Staff Person: Chad Blais
______________________________________________________________________________
Mayor and Council Oral Reports and Comments
Comments from Mayor and Council on various issues and activities throughout the community can be viewed on our City of Colton Website (www.coltonca.gov).
City Manager's Reports
None
Adjournment
Mayor Navarro adjourned the Regular Council Meeting at 6:54 PM in memoriam for long-time Colton residents Robert Granado and Benjamin Valdez; a moment of silence was observed.
________________________________
Isaac T. Suchil, City Clerk
City of Colton
City of Colton
City Hall, Council Chambers
650 N. La Cadena Drive
Colton, CA 92324
City of Colton Website
Mayor Frank J. Navarro
Council Members:
David J. Toro – District 1
Kelly J. Chastain – District 2
Dr. Luis S. González – District 3
John R. Echevarria – District 4
City Clerk Isaac T. Suchil
City Treasurer Henry M. Razo
City Manager William R. Smith
City Attorney Carlos Campos
Minutes
City Council
Colton Utility Authority, Colton Public Financing Authority Colton Housing Authority
Regular Meeting
Tuesday, November 4, 2025 – 5:00 PM
City Hall, Council Chambers
Closed Session
5:00 p.m.
Closed Session Called to Order
Closed Session meeting was called to order at 5:00 P.M. in the Council Chamber of City Hall, with Mayor Frank J. Navarro presiding.
Roll Call
Council members present were Frank J. Navarro, David Toro, Luis S. González, John Echevarria; Council member Chastain joined closed session at 5:02pm.
Also present was the City Clerk Isaac T. Suchil.
Staff present were William R. Smith, City Manager and Carlos Campos, City Attorney.
Public Comment - Closed Session
There were no Public Comments.
____________________________________________________________________________________
Closed Session
City Attorney Carlos Campos announced the City Council would meet in Closed Session to discuss Items 1 through 3.
1) Conference with Legal Counsel - Existing Litigation
Pursuant to Government Code Section 54956.9(d)(1)
Colton Housing Group LLC et al. v. City of Colton et al. San Bernardino County Superior Court Case No. CIVSB2521712.
2) Conference with Legal Counsel
Workers Compensation Case No. ADJ19813543
Dooley vs. City of Colton
3) Conference with Labor Negotiators
City Representatives: Bill Smith, City Manager & Tom Cody, HR Director Employee Groups: IBEW Water/Waste Water (IBEW W/W)
City Attorney Oral Report on Closed Session Actions
City Attorney Campos announced that the City Council met in Closed Session and discussed Closed Session Items 1 through 3; direction was given but there was no reportable action.
Campos also reported on two previous Closed Session meetings:
At the March 4, 2025 City Council meeting the Council discussed Item No. A in Closed Session and, under Real Property Negotiations, the City Council authorized the acquisition of 4 parcels. The first three parcels were parcel Nos. 0276-121-14 and -20 and -21. The acquisition authority granted for the three parcels was $1,231,780. The fourth parcel was parcel No. 0276-122-06 and the acquisition authority for this parcel was $25,800. These acquisitions related to the Mount Vernon Avenue Grade Separation project; the Council's decisions were unanimous.
At the October, 21, 2025 City Council meeting the Council discussed Item No. 1 in Closed Session, and under Conference with Legal Counsel, in the administrative appeal of Steve Contreras, the Council authorized settlement in the amount of $130,000; this Council decision was unanimous.
____________________________________________________________________________________
Open Session
6:00 P.M.
Open Session Called to Order
Mayor Frank J. Navarro called Open Session to order at 6:00 P.M.
Invocation
Pastor Don Duenez - Echoes of Love Church
Flag Salute
Veterans of Foreign Wars (VFW) Member - Bernie Moyeda
Roll Call
Council members present were Frank J. Navarro, David Toro, Kelly Chastain, Luis S. González, John Echevarria; also present was the City Clerk Isaac T. Suchil.
Staff present were William R. Smith, City Manager and Carlos Campos, City Attorney.
Ceremonial Matters
There are no ceremonial matters.
Mayor and Council Items
Gift Disclosures
None reported.
AB 1234 Oral Reports
None reported.
Appointments
None
Mayor and Council Discussion Items
1) Further Discussion Regarding City Council Compensation.
Staff Presentation
The City Attorney, Carlos Campos, presented for Council an overview of the agenda item.
Public Comment
There were no Public Comments.
Council Discussion
Discernment and discussion between Mayor and Council members present, with clarification provided by staff: City Attorney, Carlos Campos, City Manager, William R. Smith, and Finance Director, Stacey Dabbs.
Motion/Vote
A motion was made by CM Chastain, with a second by CM Toro, to direct staff to bring back to council an ordinance that will increase the City Council's compensation by a fixed stipend amount of $1600/month with the auto allowance benefit being removed, for consideration.
Vote: Motion Passed with Mayor Frank J. Navarro and CM Luis S. Gonzalez voting no.
Public Hearings
There were no Public Hearing items.
Business Items
There were no Business items.
Public Comment - Limit 3 Minutes
The following community members addressed the Council:
• Leanne Uribe, Representative for 5th District County Supervisor, Joe Baca Jr’s Office • Alicia Hester, Colton Resident
Consent Calendar
Mayor Navarro presented the Consent Calendar Items 1 through 11.
Council Discussion
Council members present selected items for clarification by staff: CM Toro and MPT Echevarria; Community Services Director, Deb Farrar, provided the clarification needed.
Motion/Vote
A motion was made to approve the Consent Calendar by CM Gonzalez, with a second by CM Toro.
Vote: Unanimous, Motion Passed
1) Minutes - Approval of Minutes for the City Council Regular Meeting held on October 21, 2025, on File in the Office of the City Clerk.
Staff Person: Isaac T. Suchil
2) Warrants - Approve US Bank voucher dated 09/17/2025 and totaling $69,254.26; voucher numbers 221933 to 222010 dated 09/30/2025 and totaling $96,901.90; voucher numbers 222011 to 222152 dated 10/02/2025 and totaling $2,671,043.62; voucher numbers 222153 to 222273 dated 10/09/2025 and totaling $1,026,899.10; and a payroll disbursement listing dated 09/13/2025 to 09/26/2025 and totaling $1,307,805.56.
Staff Person: Stacey Dabbs
3) Authorized Positions List - Amend the Authorized Positions List to Add the Position of Assistant City Manager, Resolution R-91-25.
Staff Person: Bill Smith
4) City Clerk/City Treasurer Benefits - Approve a Resolution Amending Benefits for the City Clerk and the City Treasurer, Resolution R-85-25.
Staff Person: Carlos Campos
5) Continued Funding Application - California Department of Education (CDE) - Approve a Resolution for the CDE Continued Funding Application for the Early Childhood Education Program in the Community Services Department for Fiscal Year 2026-27, Resolution R- 84-25.
Staff Person: Deb Farrar
6) Contract Award - Scott Manufacturing Solutions, Inc. - Approve Contract Award to Scott Manufacturing Solutions, Inc. in the Amount of $191,541.14 for the Purchase of Four (4) 1200 kVAR Capacitor Banks for the Electric Utility.
Staff Person: Charles Berry
7) Contract Award - Three Peaks Corp - Award Contract to Three Peaks Corp for the Design/Build of Park Improvements at Elizabeth Davis Park.
Staff Person: Deb Farrar
8) Grant - Office of Traffic Safety - Approve and Adopt a Resolution Accepting Office of Traffic Safety (OTS) Grant for FY 25/26, Resolution R-79-25.
Staff Person: Anthony Vega
9) Grant Award - Homeland Security Grant (HSAP) - Approve Resolution and Budget Amendment to Approve and Accept the FY 2021 Homeland Security Grant Award, and Reflect Purchase of Malware/Cybersecurity Hardware and Related Equipment, Resolution No. R-70-25.
Staff Person: Anthony Vega
10) PD Service Dog Disposition - Authorize the Disposition of Police Service Dog "Boy" and Approve the Purchase by Sergeant Paul Grimes.
Staff Person: Anthony Vega
11) Purchase - Altec Industries, Inc. - Approve Purchase of one Altec HLIW-T Hot Line Insulator Wash Trailer.
Staff Person: Charles Berry
____________________________________________________________________________________ Mayor and Council Oral Reports and Comments
The Mayor and Council Members provided comments on various issues and activities occurring throughout the community. Comments were limited to five minutes per speaker. All comments made by the Mayor and Council can be heard and viewed on the City of Colton website at www.coltonca.gov .
City Manager's Reports
None to report.
Adjournment
Mayor Navarro adjourned the Regular Council Meeting at 07:13 PM in memoriam for Colton resident John Hernandez who recently passed away, and for San Bernardino County Sheriff Andrew Nunez and La Mesa Police Officer Lauren Craven, who were tragically killed while serving in the line of duty; a moment of silence was observed.
_________________________
Isaac T. Suchil, City Clerk
City of Colton
Item: 2.
Staff Report
Meeting Date: December 2, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Stacey Dabbs, Finance Director
Item Name: Warrants - Approve voucher numbers 222525 to 222599 dated 10/29/2025 and totaling $91,809.21; voucher numbers 222600 to 222761 dated 10/30/2025 and totaling $1,574,808.69; voucher numbers 222762 to 222864 dated 11/06/2025 and totaling $652,237.76.
Recommended Action:
Approve voucher numbers 222525 to 222599 dated 10/29/2025 and totaling $91,809.21; voucher numbers 222600 to 222761 dated 10/30/2025 and totaling $1,574,808.69; voucher numbers 222762 to 222864 dated 11/06/2025 and totaling $652,237.76.
Background:
The California Government Code requires that the legislative body ratify all vouchers issued in the course of conducting City business.
Issues/Analysis:
All vouchers and related backup documentation have been reviewed by the Finance Director and City Manager.
Fiscal Impacts:
None.
Alternatives:
1. Provide alternative direction to staff.
Attachments:
1. Fund Number and Title Legend
2. Voucher lists
City of Colton
Fund Number and Title Legend
Fund Title Fund Title
100 GENERAL FUND 701 LLMD #2
150 TREASURERS ACCOUNT GROUP 702 LLMD #1
206 COMMUN ITY CHILD CARE 703 CFO 87-1 DEBT SERV ICE
209 DSF FLY CONSERVATION 704 CFO 87-1 CONSTRUCT ION
210 SPECIAL GAS TAX 707 CFO 88-1 DEBT SERV ICE
211 LIBRARY GRANT FUND 708 CFO 88-1 CONSTRUCTION
212 STATE TRAFFIC RELIEF FUND 709 DSF FLY CONSERVATION
213 S.Y.E.T .P. GRANT 722 STORM WATER
214 POLLUT ION REDUCT ION FUND 733 CFO 89-1 CONSTRUCT ION 215 COMMUNITY DEV ACT FUND 734 CFO 89-2 CONSTRUCT ION
216 CDBG HOUS ING REHAB FUND 744 CFO 89-1 DEBT SERV ICE 217 DRUG/GANG INTERVENTION 745 CFO 89-2 DEBT SERV ICE
218 MEASURE I FUND 750 AQUA MANSA CFO
219 STATE AID- CAPITAL PROJECTS 754 SB COUNTY HOSPITAL
220 Vi Tep 762 TRUST AND AGENCY
225 MISC GRANTS 766 DEFERRED COMPENSAT ION
240 HOST CITY FEES - CIP 781 CFO 90-1 DEBT SERVICE
247 Quimby In Lieu Fees 782 CFO 90-1 CONSTRUCT ION
248 PARK DEVELOPMENT FUND 850 Redeve lopment Obligation Retirement Fund 249 TRAFF IC IMPACT FUND 851 Successor Agency Administration 250 NEW FAC ILITIES DEVELOPMENT FEE 855 Hous ing Auth - RM PARK DEVELOPMENT 251 CIVIC CENTER DEVELOPMENT FEE 856 Housing Auth - RANCHO MED BOND PROCEEDS 252 FIRE FAC ILITY DEVELOPMENT FEE 857 LMI Asset Fund
253 POLICE FACILITY DEVELOPMENT FEE 864 Housing Auth - LOW/MOD BOND PROCEEDS 261 ASSET FORFEITURE 865 Housing Auth - RANCHO MED CHFA 326 AD 94-1 DEBT SERVICE 866 ECONOM IC DEVELOPMENT
332 1971 SEWER BONDS, A & C 867 Consolidation Proj_08 -09 350 PFA Debt Fund 870 Housing Auth - RM PARK OPERAT IONS 357 POB-Non Enterprise 871 Successor Agcy-RANCHO/M ILL PROJECT AREA 358 PENS ION OBLIGATION DEBT SERV ICE 872 Succe ssor Agcy-RANCHO/MILL DEBT SERV ICE 359 CORP YARD DEBT SERV ICE 873 Successor Agcy-RDA II PROJECT FUND 363 1978-2 ASSESSMENT DIST . 874 Housing Auth - LOW/MOD DEBT SERV ICE 364 WATER IMPRVMNT DIST A 875 Housing Auth - LOW/MOD BOND PROCEEDS 379 AD 1979-1 DEBT SERV ICE 876 Successor Agcy-SANTA ANA RIV BND PROCEED 427 AD 94-1 CONSTRUCT ION 877 Successor Agcy-SANTA ANA RIVER CIP 450 Capita l Improvement Project s 878 RDA FIXED ASSETS GROUP 451 Colton Crossing Fund 879 Successor Agcy-WEST VALLEY CIP 453 STREET IMPROVEMENTS PRGM 881 Successor Agcy-MT VERNON BOND PROCEEDS 457 CAP ITAL IMPROVEMENT 882 Successo r Agcy-MT VERNON CIP 469 EQU IPMENT REPLACEMENT 885 Successor Agcy -MT VERNON DEBT SERV ICE 520 ELECTR IC UTILITY 886 RDA ADM INISTRAT ION
521 WATER UTILITY 887 COOLEY RANCH - now 894
522 WAS TEWATER UTILITY 888 MT VERNON - now 882
523 SOLID WASTE 889 WEST VALLEY - now 879
524 CEMETERY 890 Successor Agcy-RDA - LONG TERM DEBT GRP 525 RECYCLING 891 Successo r Agcy-RDA I DEBT SERV ICE FUND 526 PUBLIC BENEFIT FUND 892 Successor Agcy-RDA I - CAP ITAL PROJECTS 527 WASTEWATER UTILITY - GRAND TERRACE 893 Successor Agcy -RDA II DEBT SERV ICE FUND 551 WATER DEVELOPMENT 894 Successor Agcy -COOLEY RANCH PRO JECT 552 SEWER DEVELOPMENT 895 Successor Agcy-COOLEY RANCH DEBT SERV 560 CEMETARY ENDOWMENT CARE 896 SANTA ANA RIVER - now 877 605 Facility & Equipment Maintenance Fund 897 Successor Agcy-SANTA ANA RIVER DEBT SVC 606 INFORMATION SERV ICES FUND 898 Housing Auth - LOW/MOD CAPITAL PROJECTS 607 INSURANCE FUND 899 Successor Agcy-WEST VALLEY PRJ - DBT SV 608 AUTOMOT IVE SHOP 941 GENERAL LONG -TERM DEBT
610 AUTOMOT IVE SHOPS 958 GENERAL FIXED ASSETS
990 GASB 34
Item: 3.
Staff Report
Meeting Date: December 2, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Chad Blais, PW & Utility Services Director Item Name: Agreement - Caltrans - Approve Agreement with Caltrans for the I-10/ Mt.
Vernon Avenue Interchange Project and Other Interchanges within the City of Colton along the I-10 Corridor.
Recommended Action:
It is recommended that the City Council:
1. Approve the Freeway Maintenance Agreement with Caltrans for the I-10/ Mt. Vernon Avenue Interchange Project (Project) and other interchanges within the City of Colton along the I-10 Corridor.
2. Authorize the City Manager to execute the Freeway Maintenance Agreement with Caltrans.
Background:
Freeway interchanges within the City of Colton along I-10 corridor include Pepper Avenue Overcrossing, Rancho Avenue Overcrossing, La Cadena Dr. Undercrossing, 9th Street Undercrossing, Mt. Vernon Ave. Overcrossing and small section of Hunts Lane Undercrossing.
Caltrans and the City of Colton jointly maintain these interchange facilities and the original freeway maintenance agreement was executed on December 23, 1986.
The I-10/Mount Vernon Avenue Interchange Project is currently out for bid and anticipated to be under construction by April 2026. This is a joint project by the City of Colton, San Bernardino County Transportation Authority (SBCTA) and Caltrans. SBCTA is the lead agency for the project. The scope of the project includes replacing the existing bridge with four lanes, two northbound left-turn pockets, sidewalk and bikelane. Also included in the project is community identification with the City of Colton name and logo on the bridge. Caltrans approved the community identification concept on 3/11/2021. Attached to the proposed freeway maintenance agreement is the project's visual rendering that includes the concept of community identification.
The estimated cost (environmental, right of way and construction) of the I-10/Mount Vernon
Avenue Interchange Project is $103,283,164. The project construction is anticipated to be completed by July 2028.
Issues/Analysis:
Caltrans and the City of Colton entered into a freeway maintenance agreement on December 23, 1986 for the segment of I-10 corridor from Rancho Avenue to Hunts Lane. Since the I-10/ Mt.
Vernon Avenue Interchange Project will be constructed soon and needs modification to the existing freeway maintenance agreement, the City of Colton and Caltrans staff agreed to include Rancho Ave., La Cadena Drive, 9th Street and Hunts Lane interchanges into the agreement.
Pepper Ave. has a separate freeway maintenance agreement since it is a newly constructed interchange. The Freeway Maintenance Agreement (Exhibit A) identifies each agency’s roles and responsibilities for the maintenance of the freeway, local streets and frontage roads. The main responsibility for the City is maintenance of community identification, street surface of overcrossing/undercrossing, signs, striping, lighting, graffiti removal, and landscaping/irrigation (local streets only).
Fiscal Impacts:
Maintenance of local streets within the I-10 corridor interchanges is part of City’s annual public works maintenance budget. There is no additional fiscal impact for this action.
Alternatives:
1. Provide alternative direction to staff.
Attachments:
1. Exhibit A - Mt Vernon - Freeway Maintenance Agreement 2025
TR 08-25-OI01
SBD-10-PM 20.2/20.8 – R21.9/24.7
FREEWAY MAINTENANCE AGREEMENT
WITH
CITY OF COLTON
This Freeway Maintenance Agreement (“AGREEMENT”) is made by and between the State of California, acting by and through the Department of Transportation (“STATE”), and the City of Colton (“LOCAL AGENCY”); each may be referred to individually as a “PARTY,” and jointly as “PARTIES.”
RECITALS
1. WHEREAS, a Freeway Agreement dated December23, 1986 was executed between LOCAL AGENCY and STATE, to document the und erstanding between PARTIES regarding the planned circulation f eatures of the Interstate 10 (I-10) and the adjustments of the loc al street and road system required for the development of that portion of I-1 0 within the jurisdictional limits of the LOCAL AGENCY; and, a plan Map for su ch freeway was attached to the Freeway Agreement showing the delin eation of STATE Highway and LOCAL AGENCY’s streets and roadways; and
2. WHEREAS, pursuant to the above Freeway Agreement an d the attached Map, LOCAL AGENCY has resumed or will resume contro l and maintenance over each of the affected relocated or reconstructed LOCAL AGENCY streets, frontage roads, and other STATE constructed local streets, except for those portions adopted as a part of the freeway proper.
3. WHEREAS, The PARTIES executed prior Freeway Maintenance Agreement(s) dated December 23, 1986. This AGREEMENT supersedes the prior Freeway Maintenance Agreement(s).
4. WHEREAS PARTIES hereto mutually desire to clarif y and define the PARTIES respective division of maintenance, and responsibilities as to their respective right of way and towards STATE HIGHWAY SYSTEM (SHS) facilities that include but are not limited to.
• Vehicular Undercrossing
• Vehicular Overcrossings
• Non-vehicular Overcrossings
• Non-vehicular Undercrossing
• Walls- Retaining Walls, Columns, Soundwalls
• Landscaped Areas
• Screening
• Interchange Operation
• Bicycle Paths