1 8207 BROOKGREEN RD.

DOWNEY, CALIFORNIA 90240
562/708-0016 562/708-3586
Lic. # 951234

CEM No. 1.1
July 24, 2022
Okan Demirci PE, QSD/P
Project Manager
City of Temple City
Proposal
Project: 5555 Jillian St., Commerce Ca
Subject: Proposal for Design and Installation of Charging Stations Scope of work: Furnish and install labor, materials and equipment for:
• Evaluate electrical power requirements and perform load calculations • Design the necessary infrastructure for the installation and electrical distribution to support the operation of (2) Terra 54V-50KW DCFC charging station (self-contained units)
• Design the necessary infrastructure for the installation and electrical distribution to support the operation of (2) CS-60 Level 2 charging stations (wall mounted, nonnetworked)
• Obtain (No Fee Permit) permit from the City of Commerce building and safety department.
• Develop the design including details for the electrical equipment mounting, and provide details for the protective barrier post fabrication and installation • Provide design/detail for equipment anchoring including seismic calculations • Prepare necessary drawings to submit to the City of Commerce Building and Safety department and SCE Utility for approval. Respond to City and/or SCE comments for necessary or required revisions.
• Develop and provide the City the project asbuilt Plans upon completion of project. •
• Supply and install electrical conduit, wiring and distribution system as designed and per approved permit.
• Install and anchor (2) Terra 54V-50KW DCFC charging station (self-contained units) and cord management system furnished by the City
• Install and anchor (2) CS-60 Level 2 charging stations (wall mounted, non-networked) and cord management system
• Supply and install (8) protective barrier post (as per design and approved permit) • Call for and coordinate for City of Commerce Building and Safety permit and any other required inspection).
• Provide startup/testing/commission and reports for all installation in this project. •
• Run conduit and conductors from electrical room to chargers. Distance to no exceed 200 LF.

Note: Excludes permits fees, plan check fees, inspection fees. Also excludes any concrete demo and footings for the chargers and/or bollards if required. Excludes any repairs or reinstallation for bird screen.

Lump Sum Price: $75,000.00
2 Option 1 – (2) footings for the (2) Terra 54V charging stations Option 1 Lump Sum Price - $6,000.00
Option 2 – (2) FastStart P-34a platforms for the (2) Terra 54V charging stations Option 2 Lump Sum Price - $1,000.00 plus Material cost of P-34a Required time: TBD
Please contact our office with any concerns regarding this matter.

Respectfully,
Pedro Lopez
Estimator
O: 562 659-8213

← All documents from this meeting