Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Mobilization 1 LS $154,245.00 $154,245.00 $114,000.00 $114,000.00 $27,000.00 $27,000.00 $98,415.00 $98,415.00 $27,000.00 $154,245.00 2 Temporary Construction Fencing with Windscreen 350 LF $8.00 $2,800.00 $20.00 $7,000.00 $8.00 $2,800.00 $12.00 $4,200.00 $8.00 $20.00 3 Traffic Control 1 LS $15,000.00 $15,000.00 $4,000.00 $4,000.00 $3,000.00 $3,000.00 $7,333.33 $7,333.33 $3,000.00 $15,000.00 4 Construction Surveying and Staking 1 LS $1,500.00 $1,500.00 $6,160.00 $6,160.00 $3,500.00 $3,500.00 $3,720.00 $3,720.00 $1,500.00 $6,160.00 5 Clear and Grub 15,125 SF $1.00 $15,125.00 $1.00 $15,125.00 $2.20 $33,275.00 $1.40 $21,175.00 $1.00 $2.20 6 Remove Turf 6,290 SF $2.00 $12,580.00 $1.00 $6,290.00 $1.00 $6,290.00 $1.33 $8,386.67 $1.00 $2.00 7 Remove Decomposed Granite (D.G.) Paving 2,315 SF $4.00 $9,260.00 $2.00 $4,630.00 $5.50 $12,732.50 $3.83 $8,874.17 $2.00 $5.50 8 Remove Wood Header 1,100 LF $5.00 $5,500.00 $3.00 $3,300.00 $3.00 $3,300.00 $3.67 $4,033.33 $3.00 $5.00 9 Remove Concrete Paving 5,420 SF $4.00 $21,680.00 $4.50 $24,390.00 $5.61 $30,406.20 $4.70 $25,492.07 $4.00 $5.61 10 Remove Boulders 3 EA $500.00 $1,500.00 $400.00 $1,200.00 $1,028.00 $3,084.00 $642.67 $1,928.00 $400.00 $1,028.00 11 Furnish and Install Decorative Permeable Concrete Pavers 3,240 SF $35.00 $113,400.00 $30.00 $97,200.00 $45.00 $145,800.00 $36.67 $118,800.00 $30.00 $45.00 12 Construct 4” Pedestrian Concrete Paving 140 SF $20.00 $2,800.00 $19.00 $2,660.00 $40.00 $5,600.00 $26.33 $3,686.67 $19.00 $40.00 13 Construct 18” Integral Color Concrete Band 380 LF $40.00 $15,200.00 $40.00 $15,200.00 $58.00 $22,040.00 $46.00 $17,480.00 $40.00 $58.00 14 Construct 6” Concrete Mow Curb 1,100 LF $20.00 $22,000.00 $25.00 $27,500.00 $40.00 $44,000.00 $28.33 $31,166.67 $20.00 $40.00 15 Furnish and Install ‘Organic-Lock’ Stabilized Disintegrated Granite (D.G.) Paving 2,300 SF $18.00 $41,400.00 $10.00 $23,000.00 $16.50 $37,950.00 $14.83 $34,116.67 $10.00 $18.00 16 Construct 6’ Ht. Tubular Steel Fence 11 LF $350.00 $3,850.00 $990.00 $10,890.00 $1,050.00 $11,550.00 $796.67 $8,763.33 $350.00 $1,050.00 17 Construct Tubular Steel Double Access Gates 1 LS $10,000.00 $10,000.00 $16,500.00 $16,500.00 $15,000.00 $15,000.00 $13,833.33 $13,833.33 $10,000.00 $16,500.00 18 Furnish and Install Drip Irrigation at Shrub Areas 3,590 SF $4.84 $17,375.60 $14.00 $50,260.00 $4.80 $17,232.00 $7.88 $28,289.20 $4.80 $14.00 19 Furnish and Install Bubblers for Trees 14 EA $336.30 $4,708.20 $34.00 $476.00 $12.20 $170.80 $127.50 $1,785.00 $12.20 $336.30 20 Remove and Replace Remote Control Valves 8 EA $1,256.70 $10,053.60 $427.00 $3,416.00 $8.80 $70.40 $564.17 $4,513.33 $8.80 $1,256.70 21 Furnish and Install Controller Assembly 1 EA $22,066.00 $22,066.00 $24,780.00 $24,780.00 $21,000.00 $21,000.00 $22,615.33 $22,615.33 $21,000.00 $24,780.00
BASE BID SCHEDULE A
BANDINI PARK
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 1 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
22 Furnish and Install P.O.C. Assembly and Backflow Assembly 1 EA $19,257.60 $19,257.60 $23,906.00 $23,906.00 $27,000.00 $27,000.00 $23,387.87 $23,387.87 $19,257.60 $27,000.00 23 Furnish and Install Spare Hunter I-40 Rotors and Swing Joints 12 EA $507.40 $6,088.80 $152.00 $1,824.00 $475.00 $5,700.00 $378.13 $4,537.60 $152.00 $507.40 24 Modify Existing Irrigation System for Turf Areas 12,001 SF $2.41 $28,922.41 $1.00 $12,001.00 $2.00 $24,002.00 $1.80 $21,641.80 $1.00 $2.41 25 Specialty Labor for Point of Connection Assembly and Controller Assembly 1 LS $2,360.00 $2,360.00 $3,000.00 $3,000.00 $7,700.00 $7,700.00 $4,353.33 $4,353.33 $2,360.00 $7,700.00 26 Furnish and Install 36” Box Trees 3 EA $2,537.00 $7,611.00 $1,965.00 $5,895.00 $1,600.00 $4,800.00 $2,034.00 $6,102.00 $1,600.00 $2,537.00 27 Furnish and Install 20’ BTH Phoenix dactylifera ‘Medjool’ Date Palm Trees 11 EA $4,366.00 $48,026.00 $5,300.00 $58,300.00 $5,400.00 $59,400.00 $5,022.00 $55,242.00 $4,366.00 $5,400.00 28 Furnish and Install 5 Gallon Shrub Plantings 253 EA $34.22 $8,657.66 $44.00 $11,132.00 $53.00 $13,409.00 $43.74 $11,066.22 $34.22 $53.00 29 Furnish and Install 1 Gallon Shrub Plantings 184 EA $10.03 $1,845.52 $12.00 $2,208.00 $45.00 $8,280.00 $22.34 $4,111.17 $10.03 $45.00 30 Turf Replacement (5’ Wide at New Hardscape) 4,000 SF $2.95 $11,800.00 $2.00 $8,000.00 $3.00 $12,000.00 $2.65 $10,600.00 $2.00 $3.00 31 Furnish and Install Mulch (3” Layer) 33 CY $295.00 $9,735.00 $100.00 $3,300.00 $140.00 $4,620.00 $178.33 $5,885.00 $100.00 $295.00 32 90-Day Landscape Maintenance Period 3,591 SF $1.65 $5,925.15 $3.00 $10,773.00 $2.00 $7,182.00 $2.22 $7,960.05 $1.65 $3.00 33 Furnish and Install Waste Receptacles 2 EA $2,500.00 $5,000.00 $4,500.00 $9,000.00 $3,550.00 $7,100.00 $3,516.67 $7,033.33 $2,500.00 $4,500.00 34 Furnish and Install Uplighting at Existing Park Sign 2 EA $2,500.00 $5,000.00 $3,795.00 $7,590.00 $4,000.00 $8,000.00 $3,431.67 $6,863.33 $2,500.00 $4,000.00 35 Furnish and Install Pedestrian Lighting 7 EA $3,500.00 $24,500.00 $7,755.00 $54,285.00 $8,500.00 $59,500.00 $6,585.00 $46,095.00 $3,500.00 $8,500.00 36 Furnish and Install Conduit, Wiring, and Pullboxes 1 LS $15,000.00 $15,000.00 $64,515.00 $64,515.00 $66,700.00 $66,700.00 $48,738.33 $48,738.33 $15,000.00 $66,700.00 $701,772.54 $733,706.00 $761,193.90 $732,224.15
1 Mobilization 1 LS $149,767.00 $149,767.00 $63,000.00 $63,000.00 $27,000.00 $27,000.00 $79,922.33 $79,922.33 $27,000.00 $149,767.00 2 Temporary Construction Fencing with Windscreen 320 LF $8.00 $2,560.00 $20.00 $6,400.00 $8.00 $2,560.00 $12.00 $3,840.00 $8.00 $20.00 3 Traffic Control (Access to Existing Residences – Includes detour plan during construction with local access only) 1 LS $15,000.00 $15,000.00 $45,000.00 $45,000.00 $25,000.00 $25,000.00 $28,333.33 $28,333.33 $15,000.00 $45,000.00 4 Construction Surveying and Staking 1 LS $1,500.00 $1,500.00 $6,160.00 $6,160.00 $6,500.00 $6,500.00 $4,720.00 $4,720.00 $1,500.00 $6,500.00 5 Stormwater Pollution Protection 1 LS $10,000.00 $10,000.00 $35,000.00 $35,000.00 $7,500.00 $7,500.00 $17,500.00 $17,500.00 $7,500.00 $35,000.00 TOTAL BASE BID SCHEDULE A AMOUNT IN NUMBERS:
BASE BID SCHEDULE B
LEONIS ST. PEDESTRIAN TUNNEL
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 2 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
6 Remove Median at Nobel St 1,818 SF $10.00 $18,180.00 $6.00 $10,908.00 $6.70 $12,180.60 $7.57 $13,756.20 $6.00 $10.00 7 Remove Asphalt Paving 11,500 SF $3.00 $34,500.00 $4.00 $46,000.00 $4.20 $48,300.00 $3.73 $42,933.33 $3.00 $4.20 8 Remove Concrete paving 1,140 SF $4.00 $4,560.00 $5.00 $5,700.00 $6.70 $7,638.00 $5.23 $5,966.00 $4.00 $6.70 9 Remove Concrete Curb and Gutter 470 LF $15.00 $7,050.00 $20.00 $9,400.00 $16.10 $7,567.00 $17.03 $8,005.67 $15.00 $20.00 10 Remove Parkway Drain Structure 150 SF $15.00 $2,250.00 $7.00 $1,050.00 $20.10 $3,015.00 $14.03 $2,105.00 $7.00 $20.10 11 Remove Guardrail 1 LS $3,000.00 $3,000.00 $1,000.00 $1,000.00 $3,050.00 $3,050.00 $2,350.00 $2,350.00 $1,000.00 $3,050.00 12 Remove Existing Caltrans Light Fixtures at Pedestrian Tunnel 16 EA $500.00 $8,000.00 $495.00 $7,920.00 $190.00 $3,040.00 $395.00 $6,320.00 $190.00 $500.00 13 Unclassified Excavation 1 LS $35,000.00 $35,000.00 $63,163.00 $63,163.00 $72,000.00 $72,000.00 $56,721.00 $56,721.00 $35,000.00 $72,000.00 14 Construct Parkway Drain (4.5” Slab) 130 SF $40.00 $5,200.00 $140.00 $18,200.00 $150.00 $19,500.00 $110.00 $14,300.00 $40.00 $150.00 15 Construct Parkway Drain (4.0” Slab) 250 SF $40.00 $10,000.00 $80.00 $20,000.00 $102.00 $25,500.00 $74.00 $18,500.00 $40.00 $102.00 16 Construct Maintenance Hole in Parkway Drain 1 EA $1,000.00 $1,000.00 $4,000.00 $4,000.00 $250.00 $250.00 $1,750.00 $1,750.00 $250.00 $4,000.00 17 Furnish and Install Parkway Drain Face Plate Assembly 1 EA $1,500.00 $1,500.00 $6,000.00 $6,000.00 $550.00 $550.00 $2,683.33 $2,683.33 $550.00 $6,000.00 18 Adjust Valve Cover to Grade 3 EA $700.00 $2,100.00 $400.00 $1,200.00 $500.00 $1,500.00 $533.33 $1,600.00 $400.00 $700.00 19 Adjust Maintenance Manhole to Grade 2 EA $2,000.00 $4,000.00 $900.00 $1,800.00 $3,500.00 $7,000.00 $2,133.33 $4,266.67 $900.00 $3,500.00 20 Construct 4” Pedestrian Concrete Paving 1,250 SF $18.00 $22,500.00 $22.00 $27,500.00 $12.00 $15,000.00 $17.33 $21,666.67 $12.00 $22.00 21 Construct 6” Vehicular Concrete Paving (Residence Driveways) 590 SF $20.00 $11,800.00 $32.00 $18,880.00 $20.00 $11,800.00 $24.00 $14,160.00 $20.00 $32.00 22 Construct 4” Hot Mix Asphalt (HMA) Paving 245 TN $250.00 $61,250.00 $214.00 $52,430.00 $190.00 $46,550.00 $218.00 $53,410.00 $190.00 $250.00 23 Construct 6” Crushed Aggregate Base 245 CY $190.00 $46,550.00 $160.00 $39,200.00 $215.00 $52,675.00 $188.33 $46,141.67 $160.00 $215.00 24 Construct 6” Concrete Curb 90 LF $70.00 $6,300.00 $30.00 $2,700.00 $68.00 $6,120.00 $56.00 $5,040.00 $30.00 $70.00 25 Construct 6” Concrete Curb and Gutter 215 LF $90.00 $19,350.00 $45.00 $9,675.00 $108.00 $23,220.00 $81.00 $17,415.00 $45.00 $108.00 26 Construct Concrete V-Gutter 62 LF $60.00 $3,720.00 $120.00 $7,440.00 $165.00 $10,230.00 $115.00 $7,130.00 $60.00 $165.00 27 Construct ADA Curb Ramp Complete with Detectable Warning Surface 1 LS $8,500.00 $8,500.00 $3,914.00 $3,914.00 $3,000.00 $3,000.00 $5,138.00 $5,138.00 $3,000.00 $8,500.00 D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 3 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
28 Furnish and Install ADA Parking Signage 1 LS $2,000.00 $2,000.00 $3,300.00 $3,300.00 $900.00 $900.00 $2,066.67 $2,066.67 $900.00 $3,300.00 29 Furnish and Install Parking Striping 1 LS $5,000.00 $5,000.00 $3,207.00 $3,207.00 $5,400.00 $5,400.00 $4,535.67 $4,535.67 $3,207.00 $5,400.00 30 Furnish and Install Wheel Stop 5 EA $200.00 $1,000.00 $85.00 $425.00 $76.00 $380.00 $120.33 $601.67 $76.00 $200.00 31 Furnish and Install Sign and Post 8 EA $300.00 $2,400.00 $605.00 $4,840.00 $464.00 $3,712.00 $456.33 $3,650.67 $300.00 $605.00 32 Furnish and Traffic Striping – Double Yellow 320 LF $8.00 $2,560.00 $3.85 $1,232.00 $14.50 $4,640.00 $8.78 $2,810.67 $3.85 $14.50 33 Furnish and Install Removable Steel Security Bollards 2 EA $2,500.00 $5,000.00 $3,250.00 $6,500.00 $3,000.00 $6,000.00 $2,916.67 $5,833.33 $2,500.00 $3,250.00 34 Power Wash and Re-Galvanize Existing Caltrans Chain Link Fence 385 LF $10.00 $3,850.00 $55.00 $21,175.00 $58.00 $22,330.00 $41.00 $15,785.00 $10.00 $58.00 35 Furnish and Install Bubblers for Trees 12 EA $613.60 $7,363.20 $1,030.00 $12,360.00 $1,250.00 $15,000.00 $964.53 $11,574.40 $613.60 $1,250.00 36 Remove and Replace Remote Control Valves 3 EA $448.40 $1,345.20 $400.00 $1,200.00 $880.00 $2,640.00 $576.13 $1,728.40 $400.00 $880.00 37 Furnish and Install Controller Assembly 1 EA $13,570.00 $13,570.00 $16,000.00 $16,000.00 $21,000.00 $21,000.00 $16,856.67 $16,856.67 $13,570.00 $21,000.00 38 Furnish and Install P.O.C. Assembly and Backflow Assembly 1 EA $18,408.00 $18,408.00 $19,354.00 $19,354.00 $27,000.00 $27,000.00 $21,587.33 $21,587.33 $18,408.00 $27,000.00 39 Specialty Labor for Point of Connection Assembly and Controller Assembly 1 LS $2,360.00 $2,360.00 $2,000.00 $2,000.00 $7,700.00 $7,700.00 $4,020.00 $4,020.00 $2,000.00 $7,700.00 40 Furnish and Install 36” Box Trees 13 EA $1,351.10 $17,564.30 $1,780.00 $23,140.00 $1,600.00 $20,800.00 $1,577.03 $20,501.43 $1,351.10 $1,780.00 41 Furnish and Install 9” or less Decorative Rock Rubble 20 TN $205.32 $4,106.40 $150.00 $3,000.00 $660.00 $13,200.00 $338.44 $6,768.80 $150.00 $660.00 42 Furnish and Install ¾” Decorative Gravel 30 TN $448.40 $13,452.00 $250.00 $7,500.00 $485.00 $14,550.00 $394.47 $11,834.00 $250.00 $485.00 43 Furnish and Install Landscape Boulders (3’ – Qty. 15 / 4’ – Qty. 9 / 5’ – Qty. 6) 39 TN $486.16 $18,960.24 $300.00 $11,700.00 $510.00 $19,890.00 $432.05 $16,850.08 $300.00 $510.00 44 90-Day Landscape Maintenance Period (Trees Only) 1 LS $1,864.40 $1,864.40 $1,000.00 $1,000.00 $3,000.00 $3,000.00 $1,954.80 $1,954.80 $1,000.00 $3,000.00 45 Furnish and Install LED Light Fixtures in Pedestrian Tunnel 16 EA $1,500.00 $24,000.00 $2,145.00 $34,320.00 $2,300.00 $36,800.00 $1,981.67 $31,706.67 $1,500.00 $2,300.00 46 Relocate Existing Light – Construct New Foundation 1 EA $7,500.00 $7,500.00 $18,293.00 $18,293.00 $18,000.00 $18,000.00 $14,597.67 $14,597.67 $7,500.00 $18,293.00 $647,440.74 $704,186.00 $691,187.60 $680,938.11
1 Mobilization 1 LS $19,577.00 $19,577.00 $73,000.00 $73,000.00 $18,700.00 $18,700.00 $37,092.33 $37,092.33 $18,700.00 $73,000.00 TOTAL BASE BID SCHEDULE B AMOUNT IN NUMBERS:
BASE BID SCHEDULE C
BANDINI ELEMENTARY SCHOOL PARKWAY (LEONIS ST.)
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 4 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
2 Temporary Construction Fencing with Windscreen 1,200 LF $8.00 $9,600.00 $20.00 $24,000.00 $8.00 $9,600.00 $12.00 $14,400.00 $8.00 $20.00 3 Traffic Control 1 LS $10,000.00 $10,000.00 $27,000.00 $27,000.00 $15,000.00 $15,000.00 $17,333.33 $17,333.33 $10,000.00 $27,000.00 4 Construction Surveying and Staking 1 LS $1,500.00 $1,500.00 $6,160.00 $6,160.00 $5,000.00 $5,000.00 $4,220.00 $4,220.00 $1,500.00 $6,160.00 5 Clear and Grub 2,140 SF $3.00 $6,420.00 $1.00 $2,140.00 $110.00 $235,400.00 $38.00 $81,320.00 $1.00 $110.00 6 Remove Trees 3 EA $1,500.00 $4,500.00 $2,000.00 $6,000.00 $515.00 $1,545.00 $1,338.33 $4,015.00 $515.00 $2,000.00 7 Construct 4” Integral Color Pedestrian Concrete Paving 1,770 SF $23.00 $40,710.00 $31.00 $54,870.00 $15.00 $26,550.00 $23.00 $40,710.00 $15.00 $31.00 8 Furnish and Install Drip Irrigation System under Trees 1 LS $47,436.00 $47,436.00 $117,990.00 $117,990.00 $50,000.00 $50,000.00 $71,808.67 $71,808.67 $47,436.00 $117,990.00 9 Furnish and Install Controller Assembly 1 EA $18,054.00 $18,054.00 $20,160.00 $20,160.00 $21,000.00 $21,000.00 $19,738.00 $19,738.00 $18,054.00 $21,000.00 10 Furnish and Install P.O.C. Assembly 1 EA $21,830.00 $21,830.00 $13,530.00 $13,530.00 $27,000.00 $27,000.00 $20,786.67 $20,786.67 $13,530.00 $27,000.00 11 Specialty Labor for P.O.C. and Controller Assembly 1 LS $2,360.00 $2,360.00 $2,000.00 $2,000.00 $7,700.00 $7,700.00 $4,020.00 $4,020.00 $2,000.00 $7,700.00 12 Furnish and Install 36” Box Trees 14 EA $1,669.70 $23,375.80 $2,195.00 $30,730.00 $1,600.00 $22,400.00 $1,821.57 $25,501.93 $1,600.00 $2,195.00 13 Furnish and Install 5 Gallon Plantings 48 EA $35.40 $1,699.20 $30.00 $1,440.00 $53.00 $2,544.00 $39.47 $1,894.40 $30.00 $53.00 14 Furnish and Install Mulch (3” Layer) 3 CY $1,026.60 $3,079.80 $150.00 $450.00 $140.00 $420.00 $438.87 $1,316.60 $140.00 $1,026.60 15 90-Day Landscape Maintenance Period 370 SF $14.16 $5,239.20 $8.00 $2,960.00 $16.00 $5,920.00 $12.72 $4,706.40 $8.00 $16.00 $215,381.00 $382,430.00 $448,779.00 $348,863.33
1 Mobilization 1 LS $7,246.00 $7,246.00 $41,000.00 $41,000.00 $3,500.00 $3,500.00 $17,248.67 $17,248.67 $3,500.00 $41,000.00 2 Temporary Construction Fencing with Windscreen 750 LF $8.00 $6,000.00 $20.00 $15,000.00 $8.00 $6,000.00 $12.00 $9,000.00 $8.00 $20.00 3 Traffic Control 1 LS $5,000.00 $5,000.00 $15,000.00 $15,000.00 $7,500.00 $7,500.00 $9,166.67 $9,166.67 $5,000.00 $15,000.00 4 Construction Surveying and Staking 1 LS $1,500.00 $1,500.00 $6,160.00 $6,160.00 $2,500.00 $2,500.00 $3,386.67 $3,386.67 $1,500.00 $6,160.00 5 Clear and Grub 1,470 SF $3.00 $4,410.00 $1.00 $1,470.00 $10.00 $14,700.00 $4.67 $6,860.00 $1.00 $10.00 6 Construct 4” Integral Color Pedestrian Concrete Paving 1,300 SF $23.00 $29,900.00 $29.00 $37,700.00 $15.00 $19,500.00 $22.33 $29,033.33 $15.00 $29.00 TOTAL BASE BID SCHEDULE C AMOUNT IN NUMBERS:
BASE BID SCHEDULE D
BANDINI ELEMENTARY SCHOOL PARKWAY (COUTS AVE.)
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 5 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
7 Furnish and Install Drip Irrigation System under Trees 1 LS $21,240.00 $21,240.00 $41,000.00 $41,000.00 $25,000.00 $25,000.00 $29,080.00 $29,080.00 $21,240.00 $41,000.00 8 Furnish and Install 5 Gallon Plantings 21 EA $36.58 $768.18 $30.00 $630.00 $53.00 $1,113.00 $39.86 $837.06 $30.00 $53.00 9 Furnish and Install Mulch (3” Layer) 2 CY $967.60 $1,935.20 $150.00 $300.00 $140.00 $280.00 $419.20 $838.40 $140.00 $967.60 10 90-Day Landscape Maintenance Period 170 SF $10.03 $1,705.10 $9.00 $1,530.00 $16.00 $2,720.00 $11.68 $1,985.03 $9.00 $16.00 $79,704.48 $159,790.00 $82,813.00 $107,435.83
1 Mobilization 1 LS $200,568.00 $200,568.00 $88,000.00 $88,000.00 $51,000.00 $51,000.00 $113,189.33 $113,189.33 $51,000.00 $200,568.00 2 Temporary Construction Fencing with Windscreen 600 LF $8.00 $4,800.00 $20.00 $12,000.00 $8.00 $4,800.00 $12.00 $7,200.00 $8.00 $20.00 3 Construction Surveying and Staking 1 LS $1,500.00 $1,500.00 $6,160.00 $6,160.00 $6,500.00 $6,500.00 $4,720.00 $4,720.00 $1,500.00 $6,500.00 4 Clear and Grub 35,680 SF $1.00 $35,680.00 $0.60 $21,408.00 $1.75 $62,440.00 $1.12 $39,842.67 $0.60 $1.75 5 Remove Concrete Paving 12,260 SF $4.00 $49,040.00 $5.00 $61,300.00 $5.30 $64,978.00 $4.77 $58,439.33 $4.00 $5.30 6 Remove Concrete Handball Court Walls 168 LF $225.00 $37,800.00 $100.00 $16,800.00 $193.00 $32,424.00 $172.67 $29,008.00 $100.00 $225.00 7 Furnish and Install Decorative Permeable Concrete Pavers 4,365 SF $35.00 $152,775.00 $30.00 $130,950.00 $45.00 $196,425.00 $36.67 $160,050.00 $30.00 $45.00 8 Construct 18” Integral Color Concrete Band 668 LF $40.00 $26,720.00 $40.00 $26,720.00 $58.00 $38,744.00 $46.00 $30,728.00 $40.00 $58.00 9 Construct 4” Pedestrian Concrete Paving 1,987 SF $20.00 $39,740.00 $22.00 $43,714.00 $12.00 $23,844.00 $18.00 $35,766.00 $12.00 $22.00 10 Construct 6” Concrete Mow Curb 1,886 LF $20.00 $37,720.00 $23.00 $43,378.00 $40.00 $75,440.00 $27.67 $52,179.33 $20.00 $40.00 11 Furnish and Install ‘Organic-Lock’ Stabilized Disintegrated Granite (D.G.) Paving 6,560 SF $18.00 $118,080.00 $10.00 $65,600.00 $16.50 $108,240.00 $14.83 $97,306.67 $10.00 $18.00 12 Furnish and Install Drip Irrigation at Shrub Areas 11,900 SF $3.54 $42,126.00 $7.00 $83,300.00 $3.00 $35,700.00 $4.51 $53,708.67 $3.00 $7.00 13 Furnish and Install Bubblers for Trees 3 EA $1,380.60 $4,141.80 $35.00 $105.00 $2,000.00 $6,000.00 $1,138.53 $3,415.60 $35.00 $2,000.00 14 Remove and Replace Remote Control Valves 13 EA $590.00 $7,670.00 $485.00 $6,305.00 $880.00 $11,440.00 $651.67 $8,471.67 $485.00 $880.00 15 Furnish and Install Controller Assembly 1 EA $18,290.00 $18,290.00 $20,180.00 $20,180.00 $21,000.00 $21,000.00 $19,823.33 $19,823.33 $18,290.00 $21,000.00 16 Furnish and Install P.O.C. Assembly 1 EA $50,740.00 $50,740.00 $66,689.00 $66,689.00 $27,000.00 $27,000.00 $48,143.00 $48,143.00 $27,000.00 $66,689.00 TOTAL BASE BID SCHEDULE D AMOUNT IN NUMBERS:
BASE BID SCHEDULE E
BRISTOW PARK
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 6 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
17 Furnish and Install Drip Irrigation at Planted Pots 16 EA $371.70 $5,947.20 $40.00 $640.00 $400.00 $6,400.00 $270.57 $4,329.07 $40.00 $400.00 18 Furnish and Install Spare Hunter I-40 Rotors and Swing Joints 24 EA $165.20 $3,964.80 $150.00 $3,600.00 $475.00 $11,400.00 $263.40 $6,321.60 $150.00 $475.00 19 Modify Existing Irrigation System for Turf Areas 7,900 SF $5.42 $42,818.00 $1.00 $7,900.00 $2.50 $19,750.00 $2.97 $23,489.33 $1.00 $5.42 20 Specialty Labor for Point of Connection Assembly and Controller Assembly 1 EA $2,950.00 $2,950.00 $2,000.00 $2,000.00 $7,700.00 $7,700.00 $4,216.67 $4,216.67 $2,000.00 $7,700.00 21 Furnish and Install 36” Box Trees 3 EA $5,192.00 $15,576.00 $3,385.00 $10,155.00 $1,600.00 $4,800.00 $3,392.33 $10,177.00 $1,600.00 $5,192.00 22 Furnish and Install 24” Box Trees 5 EA $607.70 $3,038.50 $1,200.00 $6,000.00 $1,000.00 $5,000.00 $935.90 $4,679.50 $607.70 $1,200.00 23 Furnish and Install 15 Gallon Plantings 4 EA $107.38 $429.52 $273.00 $1,092.00 $300.00 $1,200.00 $226.79 $907.17 $107.38 $300.00 24 Furnish and Install 5 Gallon Plantings 418 EA $30.68 $12,824.24 $123.00 $51,414.00 $53.00 $22,154.00 $68.89 $28,797.41 $30.68 $123.00 25 Furnish and Install 1 Gallon Plantings 1,023 EA $1.62 $1,657.26 $18.00 $18,414.00 $45.00 $46,035.00 $21.54 $22,035.42 $1.62 $45.00 26 Turf Replacement (5’ Wide Along New Hardscape) 2,224 SF $2.66 $5,915.84 $2.50 $5,560.00 $3.00 $6,672.00 $2.72 $6,049.28 $2.50 $3.00 27 Furnish and Install Mulch (3” Layer) 121 CY $223.02 $26,985.42 $85.00 $10,285.00 $140.00 $16,940.00 $149.34 $18,070.14 $85.00 $223.02 28 Pot Planter Preparation (Backfill, Soil Prep, Drainage, and Mulch) 16 EA $265.50 $4,248.00 $63.75 $1,020.00 $3,000.00 $48,000.00 $1,109.75 $17,756.00 $63.75 $3,000.00 29 Furnish and Install 9” or less Decorative Rock Rubble 90 TN $188.80 $16,992.00 $125.00 $11,250.00 $660.00 $59,400.00 $324.60 $29,214.00 $125.00 $660.00 30 Furnish and Install ¾” Decorative Gravel 40 TN $320.96 $12,838.40 $300.00 $12,000.00 $485.00 $19,400.00 $368.65 $14,746.13 $300.00 $485.00 31 Furnish and Install Landscape Boulders (3’- Qty. 49 / 4’ – Qty. 32 / 5’ Qty. 20) 129 TN $495.60 $63,932.40 $300.00 $38,700.00 $510.00 $65,790.00 $435.20 $56,140.80 $300.00 $510.00 32 90-Day Landscape Maintenance Period 1 LS $9,735.00 $9,735.00 $43,190.00 $43,190.00 $15,000.00 $15,000.00 $22,641.67 $22,641.67 $9,735.00 $43,190.00 33 Furnish and Install 36” Dia. Precast Concrete Pots 16 EA $2,500.00 $40,000.00 $3,000.00 $48,000.00 $2,700.00 $43,200.00 $2,733.33 $43,733.33 $2,500.00 $3,000.00 34 Furnish and Install Waste Receptacles 10 EA $2,500.00 $25,000.00 $4,500.00 $45,000.00 $3,200.00 $32,000.00 $3,400.00 $34,000.00 $2,500.00 $4,500.00 35 Furnish and Install Uplighting at Existing Park Sign 2 EA $2,500.00 $5,000.00 $3,795.00 $7,590.00 $4,500.00 $9,000.00 $3,598.33 $7,196.67 $2,500.00 $4,500.00 36 Furnish and Install Pedestrian Lighting 18 EA $3,000.00 $54,000.00 $7,496.50 $134,937.00 $10,000.00 $180,000.00 $6,832.17 $122,979.00 $3,000.00 $10,000.00 37 Furnish and Install Conduit, Wiring, and Pullboxes 1 LS $25,000.00 $25,000.00 $85,195.00 $85,195.00 $85,000.00 $85,000.00 $65,065.00 $65,065.00 $25,000.00 $85,195.00 TOTAL BASE BID SCHEDULE E AMOUNT IN NUMBERS: $1,206,243.38 $1,236,551.00 $1,470,816.00 $1,304,536.79 D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 7 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
1 Mobilization 1 LS $172,737.00 $172,737.00 $90,000.00 $90,000.00 $41,000.00 $41,000.00 $101,245.67 $101,245.67 $41,000.00 $172,737.00 2 Temporary Construction Fencing with Windscreen 2,000 LF $6.00 $12,000.00 $20.00 $40,000.00 $8.00 $16,000.00 $11.33 $22,666.67 $6.00 $20.00 3 Construction Surveying and Staking 1 LS $1,500.00 $1,500.00 $6,160.00 $6,160.00 $14,000.00 $14,000.00 $7,220.00 $7,220.00 $1,500.00 $14,000.00 4 Clear and Grub 30,900 SF $1.00 $30,900.00 $1.00 $30,900.00 $2.00 $61,800.00 $1.33 $41,200.00 $1.00 $2.00 5 Remove Trash Receptacle 1 EA $500.00 $500.00 $250.00 $250.00 $470.00 $470.00 $406.67 $406.67 $250.00 $500.00 6 Construct 6” Concrete Mow Curb 3,242 LF $18.00 $58,356.00 $23.00 $74,566.00 $40.00 $129,680.00 $27.00 $87,534.00 $18.00 $40.00 7 Furnish and Install ‘Organic-Lock’ Stabilized Disintegrated Granite (D.G.) Paving 9,034 SF $18.00 $162,612.00 $10.00 $90,340.00 $16.50 $149,061.00 $14.83 $134,004.33 $10.00 $18.00 8 Construct 42” Ht. 3-Rail Wood Lodge Pole Fencing 150 LF $100.00 $15,000.00 $193.00 $28,950.00 $203.00 $30,450.00 $165.33 $24,800.00 $100.00 $203.00 9 Furnish and Install Drip Irrigation at Shrub Areas 9,210 SF $2.95 $27,169.50 $12.00 $110,520.00 $4.80 $44,208.00 $6.58 $60,632.50 $2.95 $12.00 10 Furnish and Install Bubblers for Trees 5 EA $247.80 $1,239.00 $40.00 $200.00 $700.00 $3,500.00 $329.27 $1,646.33 $40.00 $700.00 11 Remove and Replace Remote Control Valves 22 EA $507.40 $11,162.80 $463.00 $10,186.00 $880.00 $19,360.00 $616.80 $13,569.60 $463.00 $880.00 12 Furnish and Install Controller Assembly #1 1 EA $20,650.00 $20,650.00 $19,720.00 $19,720.00 $23,500.00 $23,500.00 $21,290.00 $21,290.00 $19,720.00 $23,500.00 13 Furnish and Install P.O.C. Assembly #1 1 EA $27,966.00 $27,966.00 $45,520.00 $45,520.00 $35,000.00 $35,000.00 $36,162.00 $36,162.00 $27,966.00 $45,520.00 14 Furnish and Install Controller Assembly #2 1 EA $18,880.00 $18,880.00 $19,720.00 $19,720.00 $23,500.00 $23,500.00 $20,700.00 $20,700.00 $18,880.00 $23,500.00 15 Furnish and Install P.O.C. Assembly #2 1 EA $9,558.00 $9,558.00 $9,440.00 $9,440.00 $30,000.00 $30,000.00 $16,332.67 $16,332.67 $9,440.00 $30,000.00 16 Spare Hunter I-40 Rotors and Swing Joints 24 EA $155.76 $3,738.24 $150.00 $3,600.00 $475.00 $11,400.00 $260.25 $6,246.08 $150.00 $475.00 17 Modify Existing Irrigation System for Turf Areas 50,000 SF $2.04 $102,000.00 $0.70 $35,000.00 $1.00 $50,000.00 $1.25 $62,333.33 $0.70 $2.04 18 Specialty Labor for Point of Connection Assemblies and Controller Assemblies 1 LS $5,900.00 $5,900.00 $2,000.00 $2,000.00 $7,700.00 $7,700.00 $5,200.00 $5,200.00 $2,000.00 $7,700.00 19 Furnish and Install 36” Box Tree 5 EA $3,776.00 $18,880.00 $4,866.00 $24,330.00 $1,600.00 $8,000.00 $3,414.00 $17,070.00 $1,600.00 $4,866.00 20 Furnish and Install 5 Gallon Plantings 1,908 EA $23.60 $45,028.80 $44.00 $83,952.00 $53.00 $101,124.00 $40.20 $76,701.60 $23.60 $53.00 21 Furnish and Install 1 Gallon Plantings 1,725 EA $9.44 $16,284.00 $15.00 $25,875.00 $45.00 $77,625.00 $23.15 $39,928.00 $9.44 $45.00
BASE BID SCHEDULE F
ROSEWOOD PARK
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 8 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
22 Turf Replacement (5’ Wide Along New Hardscape) 8,550 SF $2.95 $25,222.50 $2.00 $17,100.00 $3.00 $25,650.00 $2.65 $22,657.50 $2.00 $3.00 23 Furnish and Install Mulch (3” Layer) 85 CY $269.04 $22,868.40 $100.00 $8,500.00 $140.00 $11,900.00 $169.68 $14,422.80 $100.00 $269.04 24 90-Day Landscape Maintenance Period 20,270 SF $0.59 $11,959.30 $1.30 $26,351.00 $0.62 $12,567.40 $0.84 $16,959.23 $0.59 $1.30 25 Furnish and Install Waste Receptacles 4 EA $2,500.00 $10,000.00 $4,500.00 $18,000.00 $3,550.00 $14,200.00 $3,516.67 $14,066.67 $2,500.00 $4,500.00 26 Furnish and Install Uplighting at Existing Park Sign 2 EA $3,000.00 $6,000.00 $3,795.00 $7,590.00 $4,000.00 $8,000.00 $3,598.33 $7,196.67 $3,000.00 $4,000.00 27 Furnish and Install Pedestrian Lighting 14 EA $3,000.00 $42,000.00 $7,496.50 $104,951.00 $7,900.00 $110,600.00 $6,132.17 $85,850.33 $3,000.00 $7,900.00 28 Furnish and Install Conduit, Wiring, and Pullboxes 1 LS $20,000.00 $20,000.00 $90,766.00 $90,766.00 $95,000.00 $95,000.00 $68,588.67 $68,588.67 $20,000.00 $95,000.00 $900,111.54 $1,024,487.00 $1,155,295.40 $1,026,631.31
1 Mobilization 1 LS $3,900.00 $3,900.00 $70,000.00 $70,000.00 $2,000.00 $2,000.00 $25,300.00 $25,300.00 $2,000.00 $70,000.00 2 Traffic Control 1 LS $15,000.00 $15,000.00 $10,000.00 $10,000.00 $1,500.00 $1,500.00 $8,833.33 $8,833.33 $1,500.00 $15,000.00 3 Remove Existing Caltrans Light Fixtures in Freeway Underpass 12 EA $500.00 $6,000.00 $825.00 $9,900.00 $360.00 $4,320.00 $561.67 $6,740.00 $360.00 $825.00 4 Furnish and Install LED Light Fixtures in Freeway Underpass 12 EA $1,500.00 $18,000.00 $2,585.00 $31,020.00 $2,800.00 $33,600.00 $2,295.00 $27,540.00 $1,500.00 $2,800.00 $42,900.00 $120,920.00 $41,420.00 $68,413.33
1 Furnish and Install Booster Pump 1 EA $54,000.00 $54,000.00 $57,600.00 $57,600.00 $55,000.00 $55,000.00 $55,533.33 $55,533.33 $54,000.00 $57,600.00 2 Specialty Labor for Booster Pump 1 LS $2,500.00 $2,500.00 $2,000.00 $2,000.00 $15,000.00 $15,000.00 $6,500.00 $6,500.00 $2,000.00 $15,000.00 3 Furnish and Install 9’X16’ Cantilever Shade Trellis 2 EA $50,000.00 $100,000.00 $34,500.00 $69,000.00 $33,500.00 $67,000.00 $39,333.33 $78,666.67 $33,500.00 $50,000.00 4 Furnish and Install 8’ Recycled Plastic Bench 3 EA $4,000.00 $12,000.00 $4,700.00 $14,100.00 $2,000.00 $6,000.00 $3,566.67 $10,700.00 $2,000.00 $4,700.00 $168,500.00 $142,700.00 $143,000.00 $151,400.00
1 Construct 3’ Ht. Concrete Low Mural Wall 70 LF $500.00 $35,000.00 $1,383.00 $96,810.00 $500.00 $35,000.00 $794.33 $55,603.33 $500.00 $1,383.00
ADDITIVE BID SCHEDULE A -
BANDINI PARK
TOTAL ADDITIVE BID SCHEDULE A AMOUNT IN NUMBERS:
ADDITIVE BID SCHEDULE B -
LEONIS ST. PEDESTRIAN TUNNEL
TOTAL BASE BID SCHEDULE F AMOUNT IN NUMBERS:
BASE BID SCHEDULE G
710 FREEWAY UNDERPASS AT TRIGGS ST.
TOTAL BASE BID SCHEDULE G AMOUNT IN NUMBERS:
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 9 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
2 Furnish and Install Decorative Mosaic Tile Artwork on Low Mural Wall 1 LS $20,000.00 $20,000.00 $144,265.00 $144,265.00 $30,000.00 $30,000.00 $64,755.00 $64,755.00 $20,000.00 $144,265.00 3 Furnish and Install 4” Perforated Pipe Trench Drain for Low Mural Wall 24 LF $150.00 $3,600.00 $75.00 $1,800.00 $100.00 $2,400.00 $108.33 $2,600.00 $75.00 $150.00 4 Furnish and Install 4” PVC Pipe Drain Connector for Pipe Trench Drain 80 LF $100.00 $8,000.00 $65.00 $5,200.00 $50.00 $4,000.00 $71.67 $5,733.33 $50.00 $100.00 5 Construct Curb Drain 2 EA $1,500.00 $3,000.00 $1,500.00 $3,000.00 $1,000.00 $2,000.00 $1,333.33 $2,666.67 $1,000.00 $1,500.00 $69,600.00 $251,075.00 $73,400.00 $131,358.33
1 Furnish and Install 9’X16’ Cantilever Shade Trellis by Poligon 2 EA $50,000.00 $100,000.00 $36,800.00 $73,600.00 $36,000.00 $72,000.00 $40,933.33 $81,866.67 $36,000.00 $50,000.00 2 Furnish and Install 8’ Recycled Plastic Bench w/ Back and End Armrests 13 EA $4,000.00 $52,000.00 $4,700.00 $61,100.00 $4,000.00 $52,000.00 $4,233.33 $55,033.33 $4,000.00 $4,700.00 3 Furnish and Install Recycled Plastic Arm Chair 10 EA $2,500.00 $25,000.00 $2,000.00 $20,000.00 $1,700.00 $17,000.00 $2,066.67 $20,666.67 $1,700.00 $2,500.00 4 Furnish and Install Recycled Plastic Coffee Table 5 EA $2,500.00 $12,500.00 $2,000.00 $10,000.00 $1,800.00 $9,000.00 $2,100.00 $10,500.00 $1,800.00 $2,500.00 $189,500.00 $164,700.00 $150,000.00 $168,066.67
1 Furnish and Install 8’ Recycled Plastic Bench w/ Back and End Armrests 6 EA $4,000.00 $24,000.00 $4,700.00 $28,200.00 $4,000.00 $24,000.00 $4,233.33 $25,400.00 $4,000.00 $4,700.00 2 Furnish and Install Recycled Plastic Arm Chair 12 EA $2,500.00 $30,000.00 $2,000.00 $24,000.00 $1,500.00 $18,000.00 $2,000.00 $24,000.00 $1,500.00 $2,500.00 3 Furnish and Install Recycled Plastic Coffee Table 6 EA $2,500.00 $15,000.00 $2,000.00 $12,000.00 $1,600.00 $9,600.00 $2,033.33 $12,200.00 $1,600.00 $2,500.00 $69,000.00 $64,200.00 $51,600.00 $61,600.00
$3,793,553.68 $4,362,070.00 $4,651,504.90 $4,269,042.86 Apparent Low
Bidder 1
Apparent Low
Bidder 2
Apparent Low
Bidder 3
$3,793,553.68 $4,362,070.00 $4,651,504.90
$3,788,449.68 $4,362,070.00 $5,051,504.90
$5,104.00 $0.00 -$400,000.00
$168,500.00 $142,700.00 $143,000.00
BID RANKING
TOTAL BASE BID AMOUNT CALCULATED BASED ON UNIT PRICES
TOTAL BASE BID AMOUNT INDICATED BY BIDDER
TOTAL BASE BID AMOUNT
(BASE BID SCHEDULE A + BASE BID SCHEDULE B + BASE BID SCHEDULE C + BASE BID SCHEDULE D + BASE BID SCHEDULE E + BASE BID SCHEDULE F + BASE BID SCHEDULE G) The award of Contract is based on this amount.
TOTAL ADDITIVE BID SCHEDULE B AMOUNT IN NUMBERS:
TOTAL ADDITIVE BID A AMOUNT
CALCULATION CORRECTIONS TO BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON CALCULATED
BID AMOUNT
TOTAL ADDITIVE BID SCHEDULE C AMOUNT IN NUMBERS:
ADDITIVE BID SCHEDULE C -
BRISTOW PARK
TOTAL ADDITIVE BID SCHEDULE C AMOUNT IN NUMBERS:
ADDITIVE BID SCHEDULE D -
ROSEWOOD PARK
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 10 of 14 Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price
1. BID TABULATION
BID TABULATION
Apparent Low Bidder 1 Apparent Low Bidder 2
HIGHEST
UNIT BID
PRICE
Vido Samarzich, Inc. Environmental Construction,
Inc.
LOWEST
UNIT BID
PRICE
Bid Item and Description
PROJECT NAME: PATHWAYS FOR HOPE PROJECT
AVERAGE BID VALUES
Apparent Low Bidder 3
C.S. Legacy Construction, Inc.
$69,600.00 $251,075.00 $73,400.00
$189,500.00 $164,700.00 $150,000.00
$69,000.00 $64,200.00 $51,600.00
$4,290,153.68 $4,984,745.00 $5,069,504.90
32.95% $1,250,000.00 19.40% $846,030.00 24.97% $1,161,425.40 Marina Landscape,
Inc.
$1,100,000.00 Hardy & Harper $47,775.00 Bravo Sign & Design $27,334.40 DB Electric, Inc. $150,000.00 Wolverine Fence
Company
$70,400.00 ACE Concrete
Cutting, Inc.
$299,710.00
Crosstown
Electrical
$598,875.00 ABC Resources, Inc. $12,921.00
Bulldog Paving $128,980.00 Onyx Paving
Company, Inc.
$72,000.00
CMB Structures,
Inc.
$38,785.00
Wolverine Fence
Company
$70,400.00
Caseland Surveying,
Inc.
$41,400.00
Crosstown
Electrical
$598,875.00
TOTAL $1,250,000.00 TOTAL $846,030.00 TOTAL $1,161,425.40 TOTAL BASE BID SCHEDULE A + BASE BID SCHEDULE B + BASE BID SCHEDULE C + BASE BID SCHEDULE D + BASE BID SCHEDULE E + BASE BID SCHEDULE F + BASE BID SCHEDULE G + ADDITIVE BID SCHEDULE A + ADDITIVE BID SCHEDULE B + ADDITIVE BID SCHEDULE C + ADDITIVE BID SCHEDULE D
SUBCONTRACTORS
TOTAL ADDITIVE BID B AMOUNT
SUBCONTRACTOR % AND AMOUNT SHOWN IN THE BID
TOTAL ADDITIVE BID C AMOUNT
TOTAL ADDITIVE BID D AMOUNT
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJBID TABULATION 11 of 14 APPARENT LOW BID AMOUNT: $3,793,553.68
REVIEW RESULT CHECKED BY DATE
YES CITY CLERK 4/9/24
YES KV 4/11/24
N/A KV 4/11/24
YES KV 4/11/24
NO KV 4/11/24
PRIME CONTRACTOR LICENSE STATUS: Vido Samarzich, Inc. 433210 KV 4/11/24 SUB CONTRACTOR LICENSE STATUS: Marina Landscape, Inc. 492862 KV 4/11/24 SUB CONTRACTOR LICENSE STATUS: DB Electric, Inc. 1010474 KV 4/11/24
PRIME CONTRACTOR DIR REGISTRATION
STATUS: Vido Samarzich, Inc. 1000013213 KV 4/11/24
SUB CONTRACTOR DIR REGISTRATION STATUS: Marina Landscape, Inc. 1000000079 KV 4/11/24 SUB CONTRACTOR DIR REGISTRATION STATUS: DB Electric, Inc. 1000909891 KV 4/11/24
PRIME CONTRACTOR DEBARMENT STATUS
FROM STATE CONTRACTS: Vido Samarzich, Inc. NOT FOUND IN ACTIVE DEBARRED LIST KV 4/11/24
SUB CONTRACTOR DEBARMENT STATUS FROM
STATE CONTRACTS: Marina Landscape, Inc. NOT FOUND IN ACTIVE DEBARRED LIST KV 4/11/24
SUB CONTRACTOR DEBARMENT STATUS FROM
STATE CONTRACTS: DB Electric, Inc. NOT FOUND IN ACTIVE DEBARRED LIST KV 4/11/24
PRIME CONTRACTOR DEBARMENT STATUS
FROM FEDERAL CONTRACTS: Vido Samarzich, Inc. NOT FOUND IN ACTIVE DEBARRED LIST KV 4/11/24
SUB CONTRACTOR DEBARMENT STATUS FROM
FEDERAL CONTRACTS: Marina Landscape, Inc. NOT FOUND IN ACTIVE DEBARRED LIST KV 4/11/24
SUB CONTRACTOR DEBARMENT STATUS FROM
FEDERAL CONTRACTS: DB Electric, Inc. NOT FOUND IN ACTIVE DEBARRED LIST KV 4/11/24 REFERENCE CHECK ACCEPTABLE:
Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) Print-out from DIR Web Page attached (http://www.dir.ca.gov/dlse/debar.html) Print-out from DIR Web Page attached (https://efiling.dir.ca.gov/PWCR/Search) Print-out from DIR Web Page attached (https://efiling.dir.ca.gov/PWCR/Search) Print-out from DIR Web Page attached (http://www.dir.ca.gov/dlse/debar.html) Print-out from DIR Web Page attached (http://www.dir.ca.gov/dlse/debar.html) Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) Print-out from SAM Web Page attached (https://www.sam.gov/SAM/) Print-out from SAM Web Page attached (https://www.sam.gov/SAM/) Print-out from DIR Web Page attached (https://efiling.dir.ca.gov/PWCR/Search) Print-out from SAM Web Page attached (https://www.sam.gov/SAM/)
2. REVIEW OF APPARENT LOW BID
APPARENT LOW BID SUBMITTED BY: Vido Samarzich, Inc.
ITEM REVIEWED/CHECKED REMARKS
TOTAL BID PRICES CALCULATED CORRECTLY: Arethmetic errors but unit prices were confirmed to be correct.
BID STAMPED AS RECEIVED PRIOR BID TIME:
BID BOND IN PROPER AMOUNT:
ALL ADDENDA ACKNOWLEDGED:
ANY APPARENT DISCREPANCY IN THE SUBMITTAL: Arethmetic errors but unit prices were confirmed to be correct.
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJREVIEW OF APPARENT LOW BID 12 of 14
REFERENCE PROJECT OWNER AND
REFERENCE NAME
TELAMOUNTDATE COMPLETEDDID THE CONTRACTOR DO QUALITY WORKDID THE CONTRACTOR STAY ON SCHEDULEDID THE CONTRACTOR ASK FOR UNNECESSARY CHANGE ORDERSDID THE CONTRACTOR FILE CLAIMS AGAINST YOUWILL YOU HIRE THE CONTRACTOR AGAIN
REMARKS
Santa Ana Blvd and 5th St
Protected Bike Lane
City of Santa Ana
Sean Thomas 714-647-5655 $6,100,000.00 2023 Y Y N N Y GDB 4/12/2024 Ocean Blvd Sidewalk
Improvements
City of Newport Beach
Michael Sinacori 714-552-5336 $514,000.00 2022 Y Y N N Y GDB 4/11/2024 Annual Sidewalk
Improvement Project
City of Pico Rivera
Nadia Carrasco 562-801-4221 $375,000.00 2022 Left VM at 4:01 PM GDB 4/11/2024 Safe Routes to School
Project
City of Monrovia
James Merrell 760-220-0722 $356,000.00 2022 Left VM at 4:02 PM GDB 4/11/2024 Local Street Curb Ramp
Improvements Phase II
City of Santa Ana
Gerardo Lechuga 714-552-5336 $399,000.00 2020 Y Y N N Y GDB 4/11/2024 Etiwanda Corridor
Improvements Project
City of Rialto
Fred Alipanah 714-381-2410 $1,098,000.00 2020 Y N N N Y Delays on the project were due to City GDB 4/11/2024
3. REFERENCE CHECK OF APPARENT LOW BIDDER
Vido Samarzich, Inc.
REFERENCE DATA FOR APPARENT LOW BIDDER
REFERENCE CHECK FOR APPARENT LOW BIDDER
CHECKED BY
DATE
Answer "YES" if satisfied or "NO" if not satisfied
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJREF CHECK 13 of 14 Vido Samarzich, Inc.
$3,793,553.68
4. LOWEST RESPONSIVE BID
LOWEST RESPONSIVE BID SUBMITTED BY:
IN THE AMOUNT OF:
D:\Dropbox (Transtech Engineers)\JOBRECRD\2022\220730 COM CLEAN CA GRANT PROJECT SUPPORT\WIP\Design Phase\Bid Analysis\0.0 BID ANALYSIS, COM, PATHWAYS FOR HOPE PROJLOWEST RESPONSIVE BID 14 of 14
Copyright © 2024 State of California
Data current as of 4/11/2024 3:12:12 PM
Home | Online Services | License Details
Contractor's License Detail for License # 433210
DISCLAIMER: A license status check provides information taken from the CSLB license database. Before relying on this information, you should be aware of the following limitations.
Business Information
VIDO SAMARZICH INC
6829 BILLINGS PLACE
RANCHO CUCAMONGA, CA 91701
Business Phone Number:(909) 987-6377
Entity Corporation
Issue Date 12/31/1982
Expire Date 12/31/2024
License Status
This license is current and active.
All information below should be reviewed.
Classifications
A - GENERAL ENGINEERING
Bonding Information
Contractor's Bond
This license filed a Contractor's Bond with AMERICAN CONTRACTORS INDEMNITY COMPANY.
Bond Number: SC6046818
Bond Amount: $25,000
Effective Date: 01/01/2023
Contractor's Bond History
Bond of Qualifying Individual
The qualifying individual VIDO SAMARZICH certified that he/she owns 10 percent or more of the voting stock/membership interest of this company; therefore, the Bond of Qualifying Individual is not required.
Effective Date: 12/31/1982
Workers' Compensation
This license has workers compensation insurance with the INSURANCE COMPANY OF THE WEST Policy Number:WSD5071349
Effective Date: 05/22/2023
Expire Date: 05/22/2024
Workers' Compensation History
CSLB complaint disclosure is restricted by law (B&P 7124.6) If this entity is subject to public complaint disclosure click on link that will appear below for more information. Click here for a definition of disclosable actions.
Only construction related civil judgments reported to CSLB are disclosed (B&P 7071.17). Arbitrations are not listed unless the contractor fails to comply with the terms. Due to workload, there may be relevant information that has not yet been entered into the board's license database.
Back to Top Conditions of Use Privacy Policy Accessibility Accessibility Certification Contractor Information
Legal Entity Name
VIDO SAMARZICH, INC.
Legal Entity Type
Corporation
Status
Active
Registration Number
1000013213
Registration effective date
11/3/2023
Registration expiration date
6/30/2024
Mailing Address
6829 BILLINGS PLACE RANCHO CUCAMONGA 91701 …
Physical Address
6829 BILLINGS PLACE RANCHO CUCAMONGA 91701 …
Email Address
Trade Name/DBA
License Number(s)
CSLB:433210
CSLB:433210
Registration History
Legal Entity Information
Corporation Number:
President Name: Vido Samarzich
Vice President Name:
Treasurer Name:
Secretary Name:
CEO Name:
Agent of Service Name: Vido Samarzich
Agent of Service Mailing Addre… 6829 Billings Place Rancho Cucamonga 91701 CA United States of America Workers Compensation
Effective Date Expiration Date
6/6/2018 6/30/2019
5/24/2017 6/30/2018
6/13/2016 6/30/2017
6/29/2015 6/30/2016
3/1/2015 6/30/2015
7/1/2019 6/30/2020
7/1/2020 6/30/2021
7/1/2021 6/30/2022
7/1/2022 6/30/2023
11/3/2023 6/30/2024
Do you lease employees
through Professional
Employer Organization
(PEO)?:
No
Please provide your current
workers compensation
insurance information
below:
PEO Information
PEO
Name
PEO
Phone
PEO
Email
Insured by Carrier
Policy Holder Name: Vido Samarzich, Inc.
Insurance Carrier: PREFERRED PROFESSIONAL INSURANCE COMPANY Policy Number: ON11274 02
Inception date: 5/22/2023
Expiration Date: 5/22/2024
Data current as of 4/11/2024 3:13:39 PM
Home | Online Services | License Details
Contractor's License Detail for License # 492862
DISCLAIMER: A license status check provides information taken from the CSLB license database. Before relying on this information, you should be aware of the following limitations.
Business Information
MARINA LANDSCAPE INC
3707 W GARDEN GROVE BLVD
ORANGE, CA 92868
Business Phone Number:(714) 939-6600
Entity Corporation
Issue Date 06/03/1986
Expire Date 06/30/2024
License Status
This license is current and active.
All information below should be reviewed.
Classifications
Bonding Information
Contractor's Bond
This license filed a Contractor's Bond with PHILADELPHIA INDEMNITY INSURANCE COMPANY.
Bond Number: PB11510401244
Bond Amount: $25,000
Effective Date: 04/04/2023
Contractor's Bond History
Bond of Qualifying Individual
The qualifying individual ROBERT BRUCE COWAN certified that he/she owns 10 percent or more of the voting stock/membership interest of this company; therefore, the Bond of Qualifying Individual is not required.
Effective Date: 12/10/2019
BQI's Bond History
Workers' Compensation
This license has workers compensation insurance with the FEDERAL INSURANCE COMPANY Policy Number:54310011
Effective Date: 08/01/2019
Expire Date: 08/01/2024
Workers' Compensation History
CSLB complaint disclosure is restricted by law (B&P 7124.6) If this entity is subject to public complaint disclosure click on link that will appear below for more information. Click here for a definition of disclosable actions.
Only construction related civil judgments reported to CSLB are disclosed (B&P 7071.17). Arbitrations are not listed unless the contractor fails to comply with the terms. Due to workload, there may be relevant information that has not yet been entered into the board's license database. A - GENERAL ENGINEERING
C27 - LANDSCAPING
C36 - PLUMBING
B - GENERAL BUILDING
C-61 / D49 - TREE SERVICE
C-61 / D59 - HYDROSEED SPRAYING
C29 - MASONRY
C-61 / D34 - PREFABRICATED EQUIPMENT
2 Copyright © 2024 State of California
Other
Personnel listed on this license (current or disassociated) are listed on other licenses.
Back to Top Conditions of Use Privacy Policy Accessibility Accessibility Certification 2 Copyright © 2024 State of California
Data current as of 4/11/2024 3:20:03 PM
Home | Online Services | License Details
Contractor's License Detail for License # 1010474
DISCLAIMER: A license status check provides information taken from the CSLB license database. Before relying on this information, you should be aware of the following limitations.
Business Information
D B ELECTRIC INC
7056 ARCHIBALD ST STE 102-404
EASTVALE, CA 92880
Business Phone Number:(951) 427-3400
Entity Corporation
Issue Date 01/21/2016
Reissue Date 01/27/2017
Expire Date 01/31/2025
License Status
This license is current and active.
All information below should be reviewed.
Classifications
C10 - ELECTRICAL
Bonding Information
Contractor's Bond
This license filed a Contractor's Bond with WESTERN SURETY COMPANY.
Bond Number: 66861164
Bond Amount: $25,000
Effective Date: 03/30/2024
Contractor's Bond History
Bond of Qualifying Individual
The qualifying individual DAVID FERNANDEZ certified that he/she owns 10 percent or more of the voting stock/membership interest of this company; therefore, the Bond of Qualifying Individual is not required.
Effective Date: 01/27/2017
Workers' Compensation
This license has workers compensation insurance with the PALOMAR SPECIALTY INSURANCE COMPANY Policy Number:PSIC0701316801
Effective Date: 09/01/2023
Expire Date: 09/01/2024
Workers' Compensation History
Miscellaneous Information
CSLB complaint disclosure is restricted by law (B&P 7124.6) If this entity is subject to public complaint disclosure click on link that will appear below for more information. Click here for a definition of disclosable actions.
Only construction related civil judgments reported to CSLB are disclosed (B&P 7071.17). Arbitrations are not listed unless the contractor fails to comply with the terms. Due to workload, there may be relevant information that has not yet been entered into the board's license database. 01/27/2017 - LICENSE REISSUED TO ANOTHER ENTITY
Back to Top Conditions of Use Privacy Policy Accessibility Accessibility Certification Contractor Information
Legal Entity Name
MARINA LANDSCAPE, INC.
Legal Entity Type
Corporation
Status
Active
Registration Number
1000000079
Registration effective date
7/1/2022
Registration expiration date
6/30/2025
Mailing Address
3707 W. GARDEN GROVE BLVD. ORANGE 92868 CA…
Physical Address
3707 W. GARDEN GROVE BLVD. ORANGE 92868 CA…
Email Address
Trade Name/DBA
License Number(s)
CSLB:492862
CSLB:492862
Registration History
Legal Entity Information
Corporation Number:
President Name: Robert B. Cowan
Vice President Name: Ali Tavakoli
Treasurer Name: Robert B. Cowan
Secretary Name: Robert B. Cowan
CEO Name: Robert B. Cowan
Agent of Service Name: Robert B. Cowan
Agent of Service Mailing Addre… 3707 W. Garden Grove Blvd. Orange 92868 CA United States of America Workers Compensation
Effective Date Expiration Date
5/11/2018 6/30/2019
5/23/2017 6/30/2018
5/25/2016 6/30/2017
6/15/2015 6/30/2016
7/2/2014 6/30/2015
7/1/2019 6/30/2022
7/1/2022 6/30/2025
Do you lease employees
through Professional
Employer Organization
(PEO)?:
No
Please provide your current
workers compensation
insurance information
below:
PEO Information
PEO
Name
PEO
Phone
PEO
Email
Insured by Carrier
Policy Holder Name: MARINA LANDSCAPE, INC.
Insurance Carrier: Federal Insurance Company
Policy Number: 54310011
Inception date: 7/31/2021
Expiration Date: 8/1/2022
Contractor Information
Legal Entity Name
DB Electric, Inc.
Legal Entity Type
Corporation
Status
Active
Registration Number
PW-LR-1000909891
Registration effective date
7/1/2022
Registration expiration date
6/30/2024
Mailing Address
7056 Archibald Avenue Ste. 102-404 Eastvale 92880 C…
Physical Address
7696 Hall Avenue Eatvale 92880 CA United States of A…
Email Address
Trade Name/DBA
License Number(s)
CSLB:1010474
Registration History
Legal Entity Information
Corporation Number:
President Name: David Fernandez
Vice President Name: Brad Blokzyl
Treasurer Name: David Fernandez
Secretary Name: Brad Blokzyl
CEO Name: David Fernandez
Agent of Service Name: George Teats
Agent of Service Mailing Addre… 540 N. Golden Circle Dr, Suite 206 Santa Ana 92705 CA United States of America Workers Compensation
Effective Date Expiration Date
7/1/2022 6/30/2024
Do you lease employees
through Professional
Employer Organization
(PEO)?:
No
Please provide your current
workers compensation
insurance information
below:
PEO Information
PEO
Name
PEO
Phone
PEO
Email
Insured by Carrier
Policy Holder Name: DB Electric, Inc.
Insurance Carrier: State Compensation Insurance Fund
Policy Number: 9236994-21
Inception date: 9/1/2021
Expiration Date: 9/1/2022
DLSE Debarments
The following is a list of contractors barred from bidding on, accepting, or performing any public works contracts, either as a contractor or subcontractor. Please refer to the “Period of Debarment” for status of debarment period as noted below:
As part of your due diligence, we suggest that you also check:
Contractor status at the Contractors State License Board (CSLB) The Federal debarment list at the Excluded Parties List System Name of contractor Period of debarment
MICHAEL FLOORING, INC.;
BENNY MICHAEL
CSLB License Number: 874947
5/30/2023 through 5/30/2026
Decision SC 7278
The debarment order is currently
stayed by order of the Kern County
Superior Court
TOBO CONSTRUCTION, INC.;
JIMI WAN CHAE; MONICA SHIUN OH;
KYUNG JIN YOON,
CSLB License Number: 758012
5/10/2023 through 5/10/2026
Decision SC 7250
G M Climate Control, Inc.
CSLB License Number: 967267
3/2/2023 through 9/2/2024
Decision 40-71536-603
MINAKO AMERICA CORPORATION DBA MINCO
CONSTRUCTION;
AND REFAAT HILMAY MINA,
CSLB License Number: 612429
9/27/2021 through 9/26/2022
Decision LB 6333
GRFCO, INC. DBA ONSITE KRUSHING;
GARCIA JUAREZ CONSTRUCTION, INC.;
GEORGE ROBERT FROST; AND JAMES CRAIG JACKSON
5/21/2021 through 5/20/2024
Decision LB 6629
CSLB License Number: 291013 and 84801
ECS CONTRACTORS, INC. dba ECS ELECTRIC, INC.;
UMAR KHALID RANA, an indvidual and CEO/RMO of ECS
CONTRACTORS, INC.; and KANWAL SAJJAD RANA, an
indvidual and RMO of ECS CONTRACTORS, INC.
CSLB License Number: 975222
3/1/2020 through 3/1/2023
Decision LB 5590
Avi Shechter, Individually
DBA Avi Shechter
CSLB Number: 908891 and 1018353
5/6/2019 through 5/5/2022
Decision LB 6328
Patrick Kim, Individually
DBA Ritecon Plumbing
CSLB Number: 991018
8/21/2018 through 8/20/2019
Decision LB 6762
Bighorn Construction, Inc.
CSLB Number: 597866
5/5/2018 through 5/4/2021
Decision LB 6658
Doug Parks, Individually dba
Doug Parks and Son Plumbing
CSLB Number: 411825
10/11/2017 through 10/10/2019
Decision SC 5807
Worthington Construction, Inc.;
Dale Worthington, an individual and CEO/RMO of
Worthington Construction, Inc.; and,
Holi Jeanne Worthington, an individual and Officer of
Worthington Construction
CSLB Number: 714836
6/15/2018 through 9/16/2019
Decision LB 5267
RMV Construction, Inc., A California Corporation; and
Robert
Michael Vasil II a.k.a. Robert Michael Vasil a.k.a.
Mike Vasil, an Individual and CEO/RMO President of RMV
Construction, Inc.
CSLB Number: 892389
4/1/2017 through 8/18/2018
Decision LB 5266
Gewargis Youkhanis Narso, an individual dba
GEHVAC and Technologies, a sole proprietorship,
And GEHVAC Co., a sole proprietorship
CSLB Number: 899312 and 1013848
2/1/2017 through 1/31/2020
Decision 40-48480-516
Joseph Brothers Enterprise, Inc.; Ken Joseph Individually and as CEO
CSLB Number: 849169
4/3/2018 through 10/3/2019
Decision SC 6390
Dave Cook Concrete Construction, Inc., and David William Cook
34231 Camino Capistrano #102
Capistrano Beach, CA 92624-1189
CSLB Number: 461897
3/1/2017 through 2/29/2020
Decision LB 6207
Bannaoun Engineers Constructors Corporation; Omar
Maloof, An Individual
P.O. Box 16599
Beverly Hills, CA 90209-2599
CSLB Number: 827829
05/12/17 through 05/11/20
Decision SC 5517
Evans Roofing Co., Inc.
2020 South Yale Street
Santa Ana, CA 92706
CSLB Number: 610549
10/31/16 through 10/30/19
Decision LB 6270
Guillermo Ibaibarriaga dba Sierra Nevada Stucco and 2K
Roofing
Sierra Nevada Stucco
P.O. Box 8472
Reno, NV 89502
CSLB Number: 915812
2K Roofing
820 Kuenzli Street
Reno, NV 89502
CSLB Number: 954551
05/14/17 through 05/13/20
Decision SC 6037
Del Norte Construction, And Trinidad Manuel Canales, an Individual
PO Box 5101
Oxnard, CA 93030
5020 Wooley Rd.
Oxnard, CA 93030
CSLB Number: #945723
6/01/16 through 5/31/17
Decision LB 5533
Diversified Building & Electric Company, Inc.
409 Tennant Station
Morgan Hill, CA 95037
Denis Andrew Maris, Individually and Doing Business as
Diversified Electric Company
CSLB Number: #765312
2/15/16 through 8/15/17
Decision SC 5714
Fast Demolition, Inc.
601-C East Palomar Street #123
Chula Vista, CA 91911
CSLB Number: #792729
Rogelio Medina Vazquez., an individual and in his capacity as Responsible Managing Officer of FAST DEMOLITION,
INC.
4/1/44 through 3/31/47
Decision LB5742
4/1/41 through 3/31/44
Decision LB5665
4/1/36 through 3/31/39
Decision LB5740
4/1/33 through 3/31/37
Decision LB5651
4/1/33 through 3/31/37
Decision LB5739
4/1/24 through 3/31/27
Decision LB5741
4/1/30 through 3/31/33
Decision LB5743
4/1/27 through 3/31/30
Decision LB5666
4/1/21 through 3/31/24
Decision LB5667
4/1/18 through 3/31/21
Decision LB5668
4/01/15 through 3/31/18
Decision LB5345
Amerivet Plumbing, Inc.; Walter Edward Jacob Kuhlmann
III, Individually And dba Amerivet Plumbing Services
CSLB Number: #969048 and #919761
8/6/15 through 8/5/18
Decision SC 5756
Ultimate Inc., And, Enrique Vera, an Individual
PO Box 571117
Tarzana, CA 91356-1117
CSLB Number: #949229
12/1/15 through 11/30/18
Decision LB 5655 & LBS659
Travioli Construction, Inc.
PO Box 231
Visalia, CA 93274
CSLB Number: #936832
9/11/15 through 3/10/17
Decision SC 5800
Integrity Sheet Metal, Inc.
319 McArthur Way
Upland, CA 91786
CSLB #726770
William Ben Hicks, an individual;
Margaret Mary Hicks, an individual
2/01/15 through 1/31/18
Decision LB 5596
L A Builders, Inc., a California Corporation
15635 Saticoy Street, #H
Van Nuys, CA 91406
CSLB #748591
Alon Gamliel, an individual
2/01/15 through 1/31/18
Decision LB5 171
USA Wall Systems, Inc.
8309 Sunshine Lane
Riverside, CA 92508
CSLB #929610
Edward Eugene Brammer, an individual
and in his capacity as President/CEO/RMO
4/01/15 through 3/31/18
Decision LB 5323
Daughter Construction
formerly dba Hy Carpentry Construction
15407 Thornlake Avenue
Norwalk, CA 90650
CSLB #979297
Sharon Jin Yoo, an individual;
Dae Hyun Yoo, an individual
and in his capacity as manager/supervisor for Sharon Jin Yoo and in his capacity as General Partner for HY
Construction, a General Partnership.
4/01/15 through 3/31/18
Decision LB 5466, LB5467, LB5468 &
LB5520
RDA Construction, Inc.
1692 W. Bullard Ave.,
Fresno, CA 93711
CSLB# 383306
12/15/14 through 12/14/16
Decision 40-40508-522 & 44-40509-
522
Titan Electrical Construction, Inc.
Lucas Oliver Stickney, an individual
Jamie Noel Furr, an individual
630 Natoma Street
San Francisco, CA 94103
CSLB# 919516
11/3/14 through 11/2/17
Decision SC 5539
Ramos Painting
Carlos Ray Ramos, an individual
P.O. Box 3871
Paso Robles, CA 93447
CSLB# 753575
11/3/14 through 11/2/15
Decision SC 5518
Dick Emard Electric.
dba Emard Electric Luke Richard Emard, an individual and RMO
5930 Key Court, Suite A
Loomis, CA 95650
CSLB# 794007
11/3/14 thorough 11/2/17
Decision SC 5521
Nixon Electric
Gordon Fulton Nixon, an individual
5624 Faust Ave.
Woodland Hills, CA 91367
CSLB# 796802
8/1/14 through 7/31/17
Decision LB 4495
Neris General Contractors, a California Corporation
Efren Neri, an individual
Servando Neri, an individual
Rebeca Neri, an individual
Luis Abelardo Castro, an individual
6087 California Ave.
Long Beach, CA 90805
CSLB# 797967
2/28/14 through 2/27/17
Decision LB 4511, LB4512 & LB4521
Southland Construction
Reza Mohammedi, an individual
3943 Irvine Blvd., #405, Irvine, CA 92602
CSLB# 663784 (expired)
10/14/14 through 10/13/17
Decision SAC 5492
National Drywall Corporation,
A Dissolved California Corporation
603 S. Milliken Avenue, Suite F
Ontario, CA 91761
CSLB #834335
8/4/14 through 8/3/17
Decision SAC 5506
Miguel Contreras, an Individual and
Responsible Managing Officer/CEO/President
Dora Maria Contreras, an Individual and
Agent/Officer of the Corporation
Tadros & Youssef Construction, Inc.
Kamel Shaker Tadros & Makram Youssef Youssef,
Individually
1221 E 8th Street, Unit A, Upland, CA 91786
CSLB# 698182 (expired)
5/10/14 through 5/9/17
Decision SAC 5308
Serenity Fire Protection
417 S. Associated Road, Brea, CA 92821
CSLB# 902927
5/1/14 through 4/30/17
Decision LB 4202
Don Kelly Construction , Inc.
Don Kelly, Individual and Lisa Kelly, Individual
171 Northview Ridge Lane, P.O. Box 10760, Bozeman, MT
59719
3/25/14 through 3/24/17
Decision LB 4484
Aldan, Inc.
P.O. Box 9428, Brea, CA 92822
CSLB #949229
2/28/14 through 2/27/17
Decision LB5175
Russell/Thompson, Inc.
James Jean Russell & Valery Alena Thompson, Individually 4684 Oak Glen Dr., Redding, CA 96001
CSLB# 915036 (revoked)
10/31/13 through 10/31/16
Decision SC 5309
Ayodejia A. Ogundare, Individual
Dba Pacific Engineering Company
6310 Stewart Way, Bakersfield, CA 93308
5/15/2013 through 5/15/2014
Decision SAC 1039
CLSB#710322
Wallcrete Industries, Inc.; Garit David
Wallace and Amber Anderson, Individuals
400 Kansas, Redlands, CA 92373
CSLB#834220
7/29/12 through 7/28/15
Decision SAC 5175
FEI Enterprises, Inc
Gabriel Fedida, Individual
5749 Venice Blvd., Los Angeles, CA 90019
CSLB#659252
6/14/12 through 6/13/15
Decision SC 5198
Jeffrey Alan Mott and Michelle Mott, individuals
Dda Integrity Landscape
3756 Independence Avenue
Sanger, CA 93637
CSLB#774222
3/29/12 through 3/28/15
Decision SC 5160
Jensen Drywall & Stucco
Jeffrey E. Jensen
3714 Lynda Place
National City, CA 91950-8121
CSB # 664168 Exp. 2/18/11 (expired)
3/31/11 through 3/30/13
Decision SC 5095
All West Construction, Inc.
Donald Kent Russell
495 N. Marks Ave.
Fresno, CA 93706
CSB # 592321 Exp. 4/3/12 (suspended)
3/31/11 through 3/30/13
Decision se 5013
Country Builders, Inc.
Weldon Offill, individually
5915 Graham Ct.
Livermore, CA 94550
CSB # 699574 Exp. 11/30/12 (active)
3/1/11 through 2/28/14
Decision SC 5053
Addendum SC 5053
Sutter Foam & Coating, Inc.
909 A. George Washington
Yuba City, CA 95993
CSB # 732014 Exp. 1/31/09 (inactive)
David Alvin Trexler, an individual
909 A. George Washington
Yuba City, CA 95993
Kenneth A. Trexler, an individual
2603 Lago Lane
Marysville, CA 95901
7/1/10 through 6/30/13
Decision SAC 5012
Soo Dong Kim, an individual,
dba Soo Kim Electric Company
16224 Ridgeview Lane
La Mirada, CA 90638
CSB # 568103 Exp. 8/1/09 (inactive)
Hyo Nam Jung, an individual,
dba Lucid Electric
18621 Well Street
Rowland Heights, CA 91748
CSB # 914692 Exp. 4/3/10
4/19/10 through 4/18/13
Decision SAC 1064
Southwest Grading,
dba Southwest Grading Services, Inc.,
22031 Waite Street
Wildomar, CA 92595
David Walter Cholewinski, an individual
22031 Waite Street
Wildomar, A 92595
29970 Technology Drive, Ste. 205
Murrieta, CA 92563
CSB #840416 Exp. 6/30/10
3/18/10 through 3/17/13
Decision SAC 1058
S.J. Cimino Electric, Inc., a California corporation,
3267 Dutton Ave.
Santa Rosa, CA 95404
Salvatore Joseph Cimino, RMO, CEO and President of S.J. 10/15/09 through 10/14/12
Decision SAC 1052
Cimino Electric, Inc. and sole owner of S.J. Cimino
Electric, an individual
5825 Heights Rd.
Santa Rosa, CA 95401
CSB #343802 Exp. 2/28/10
CSB #294141 Exp. 9/30/13 (inactive)
Cedar Development Corporation
Serghon Gabriel Afram, individually
12477 Feather Dr
Mira Loma, CA 91752
CSB # 839898 Exp. 6/30/10 (suspended)
8/5/09 through 8/4/12
Decision SAC 1042
All Floors Commercial and Residential Flooring, Inc.
Salvador Elias Perea, individually
750 E. McGlincy Lane, #103
Campbell, CA 95008
CSB #430969 Exp. 7/31/09
5/14/09 through 5/13/12
Decision SAC 1040
1-AMD Construction, Inc.
Alberto Mordoki, individually
Mirella Mordoki, individually
5300 Beach Blvd., Suite 110-416
Buena Park, CA 90621
CSB #787533, revoked
3/16/09 through 3/15/12
Decision SAC1037
Updated: August 2023
An official website of the United States government Here’s how you know Home Search Data Bank Data Services Help
Search All Words e.g. 1606N020Q02 Search Results Saved Searches Select Domain
Entity Information
All Entity Information
Entities
Disaster Response Registry
Responsibility / Qualification
Exclusions
Filter By
Keyword Search
For more information on how to use our keyword search, visit our help guide Simple Search Search Editor
e.g. 123456789, Smith Corp
Any Words
All Words
Exact Phrase
"Vido Samarzich"
Classification
Excluded Individual
Excluded Entity
Federal Organizations
Exclusion Type
Exclusion Program
Location
Dates
"Marina Landscape"
"DB Electric"
Reset
No matches found
We couldn't find a match for your search criteria.
Please try another search or go back to previous results.
Go Back
Our Website
About This Site
Our Community
Release Notes
System Alerts
Our Partners
Acquisition.gov
USASpending.gov
Grants.gov
More Partners
Policies
Terms of Use
Privacy Policy
Customer Service
Help
Check Entity Status
WARNING
SAM.gov
An official website of the U.S. General Services Administration Disclaimers
Freedom of Information Act
Accessibility
Federal Service Desk
External Resources
Contact
This is a U.S. General Services Administration Federal Government computer system that is "FOR OFFICIAL USE ONLY." This system is subject to monitoring. Individuals found performing unauthorized activities are subject to disciplinary action including criminal prosecution.
This system contains Controlled Unclassified Information (CUI). All individuals viewing, reproducing or disposing of this information are required to protect it in accordance with 32 CFR Part 2002 and GSA Order CIO 2103.2 CUI Policy.