Members of the public may address the City Council on any item shown on the agenda or matter of the Council’s authority after completion of “Request to Address the Council Form” available in the lobby of the Council Chambers. This form must be completed 15 minutes prior to the scheduled meeting time.

Pursuant to Section 54957.5 of the California Government Code, Any writings (Except for those writings which are exempt from disclosure) which are distributed to all or a majority of the members of the City Council are available for public inspection in the lobby of the City Council Chambers and in the office of the City Clerk during regular business hours.

COMPTON CITY COUNCIL
AGENDA
03/01/2022
5:30 PM

OPENING

MOMENT OF SILENCE

PLEDGE OF ALLEGIANCE

ROLL CALL

PUBLIC COMMENTS ON AGENDA ITEMS AND NON-AGENDA MATTERS

REGULAR AGENDA

CITY MANAGER'S REPORT

1. LEGISLATION UPDATE REPORT - Caliph & Mel Assagai, California Policy Solutions

NEW BUSINESS

2. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON ACTING

AS THE HOUSING SUCCESSOR AGENCY OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AMENDMENT OF

THE PROPERTY MAINTENANCE SERVICES AGREEMENT WITH NEW WEST

LANDSCAPING AND INCREASE THE OPEN PURCHASE ORDER TO PROVIDE

COMPENSATION FOR ADDITIONAL SERVICES RENDERED DURING FISCAL YEAR 2021-2022 ($14,400)
-2- City Council Agenda 3/1/2022
5:30 PM

3. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON APPROVING A THREE (3) YEAR EMPLOYMENT AGREEMENT WITH THOMAS

THOMAS TO SERVE AS CITY MANAGER OF THE CITY OF COMPTON
($221,000.00)

4. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ISSUE ANNUAL PURCHASE ORDERS TO INSIGHT PUBLIC SECTOR, INC. FOR MICROSOFT SOFTWARE LICENSES COVERING A THIRTY SIX (36) MONTH TERM IN AN AMOUNT NOT TO

EXCEED TWO HUNDRED FOURTEEN THOUSAND NINE HUNDRED AND
EIGHTY-FOUR DOLLARS ($214,984.00)

5. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH

EMERGENCY PLANNING CONSULTANTS (EPC) TO REVISE AND UPDATE THE CITY'S HAZARD MITIGATION PLAN ($45,000) AND TO AMEND THE FISCAL YEAR 2021-2022 REVENUE BUDGET TO APPROPRIATE

ANTICIPATED GRANT REVENUE OF THIRTY THREE THOUSAND SEVEN HUNDRED FIFTY ($33,750.00)

6. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO A THIRD AMENDMENT

TO THE PROFESSIONAL SERVICES AGREEMENT WITH AND ESTABLISH A

PURCHASE ORDER FOR INTERWEST CONSULTING GROUP TO PROVIDE ON-CALL CIVIL AND TRAFFIC ENGINEERING SERVICES ($343,520)

7. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO AMEND THE PROFESSIONAL

SERVICES AGREEMENT WITH AND ESTABLISH A PURCHASE ORDER FOR

JMD TO PROVIDE ADDITIONAL STREET DESIGN SERVICES FOR THE COMPTON BOULEVARD STREET IMPROVEMENT PROJECT, CIP# 18-03 ($932,644.98)

COUNCIL COMMENTS

ADJOURNMENT
NEXT REGULAR MEETING: 3/8/2022 @ 5:30 PM
Visit our website at http://www.comptoncity.org
March 1, 2022
TO: HONORABLE MAYOR AND COUNCIL MEMBERS
FROM: CITY MANAGER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON ACTING

AS THE HOUSING SUCCESSOR AGENCY OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AMENDMENT OF

THE PROPERTY MAINTENANCE SERVICES AGREEMENT WITH NEW WEST

LANDSCAPING AND INCREASE THE OPEN PURCHASE ORDER TO

PROVIDE COMPENSATION FOR ADDITIONAL SERVICES RENDERED
DURING FISCAL YEAR 2021-2022 ($14,400)

SUMMARY
Staff requests that the City Council of the City of Compton (“City”) acting as Housing Successor Agency authorize the City Manager to enter into an amendment to the FY 2021-22 Property Maintenance Services agreement with New West Landscaping (“New West”) to provide compensation for additional landscape maintenance services on Housing Successor Agencyowned properties rendered during Fiscal Year 2021-2022 and increase the current purchase order by the amount of Fourteen Thousand Four Hundred Dollars ($14,400.00).

BACKGROUND
The City acting as the Housing Successor Agency has provided landscaping services, property maintenance and management activities on Housing Successor Agency-owned parcels. The intent is to prepare the subject sites for future housing development while ensuring public safety and discouraging vandalism and illegal dumping on the Housing Successor Agency-owned parcels.

On May 19, 2021, an RFP was released by the City to solicit proposals for landscape and maintenance services. New West was determined to be the lowest most responsible bidder to the RFP for landscape and maintenance from a total of four proposals.

On September 7, 2021, the Council adopted Resolution 25,537, which authorized the City Manager to enter into a contract with New West Landscaping for property maintenance and landscaping services for Housing Successor Agency owned parcels in Fiscal Year 2021-22. The resolution authorized a purchase order in the amount of $13,500 for Fiscal Year 2021-22. The executed contract authorized the City Manager to extend the contract for one fiscal year at his/her discretion.

STATEMENT OF ISSUE
Currently, New West provides bi-weekly service to Housing Successor Agency owned properties per its contract. The Property Maintenance Services Contract between New West and the City states in Section 1 “Services include but are not limited to abatement of all dumped materials and debris, weed abatement, trash removal, shrub and tree trimming, and removal and disposal of all materials abated.”

2. Unfortunately, due a significant amount of constant illegal dumping, vandalism and the rise in homeless encampments has been occurring on Housing Successor Agency-owned properties, staff recommends an increase to the maintenance schedule to once a week; in order to minimize and abate the large amount of illegal dumping of trash, debris, construction materials and other waste.

The proposed contract amendment for $14,400 is more cost effective and efficient due to the fact the city receives on average 1-2 calls per week regarding illegal dumping which averages $500- $1,000 per call. Whereas, the amendment for these services will cover all calls related to the Housing Successor Agency properties. The original contract was awarded through an RFP process; as a result, the proposed additional services would only require an amendment to the original contract.

FISCAL IMPACT
This contract amendment will not impact the General Fund. The Housing Successor Agency FY 2021-2022 Budget has funds available in the amount of $14,400 in account #1205-920-000-4269.

RECOMMENDATION
Staff recommends that the City Council adopt the attached Resolution.

RONERICK D. SIMPSON

CITY MANAGER
RESOLUTION NO.________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON ACTING AS

THE HOUSING SUCCESSOR AGENCY OF THE CITY OF COMPTON AUTHORIZING

THE CITY MANAGER TO ENTER INTO AN AMENDMENT OF THE PROPERTY

MAINTENANCE SERVICES AGREEMENT WITH NEW WEST LANDSCAPING AND

INCREASE THE OPEN PURCHASE ORDER TO PROVIDE COMPENSATION FOR ADDITIONAL SERVICES RENDERED DURING FISCAL YEAR 2021-2022 ($14,400) WHEREAS, the City of Compton acting as Housing Successor Agency provides landscaping services and property maintenance and management activities to prepare the City owned sites for future housing development while ensuring public safety and discouraging vandalism and illegal dumping on the Agency-owned parcels; and WHEREAS, on May 19, 2021, an RFP was released by the City to solicit proposals for landscape and maintenance services. New West Landscaping (“New West”) was determined to be the lowest most responsible bidder to the RFP for landscape and maintenance from a total of four proposals; and
WHEREAS, on September 7, 2021, the City Council adopted Resolution 25,537, which authorized the City Manager to enter into a contract with New West for property maintenance and landscaping services for Fiscal Year 2021-22 on Housing Successor Agency owned parcels; and WHEREAS, Resolution 25,537 authorized a purchase order of $13,500 for Fiscal Year 2021-22 and the executed contract authorized the Executive Director to extend the contract for one fiscal year at his/her discretion; and
WHEREAS, because of the increasing volume of illegal dumping, vandalism and the rise in homeless encampments that occurs on City-owned properties, staff recommends that New West increase its service to once weekly from bi-weekly to keep the properties free from trash, debris, construction materials and other waste.; and
WHEREAS, during the FY 2021-22 annual budget process, staff allocated $13,500 for the landscape and maintenance services contract; and
WHEREAS, due a significant amount of constant illegal dumping, vandalism and the rise in homeless encampments has been occurring on Housing Successor Agency-owned properties, staff recommends an increase to the maintenance schedule to once a week; in order to minimize and abate the large amount of illegal dumping of trash, debris, construction materials and other waste; and
WHEREAS, the proposed contract amendment for $14,400 is more cost effective and efficient due to the fact the city receives on average 1-2 calls per week regarding illegal dumping which averages $500-$1,000 per call; and
WHEREAS, the amendment for these services will cover all calls related to the Housing Successor Agency properties. The original contract was awarded through an RFP process; as a result, the proposed additional services would only require an amendment to the original contract.
.

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON, HEREBY RESOLVES AS FOLLOWS:

Section 1. That the City Manager, upon the advice and approval of the City Attorney is hereby authorized to enter into an amendment of the property maintenance services agreement with New West Landscaping to provide Fourteen Thousand Four Hundred Dollars (14,400.00) in compensation for services during Fiscal Year 2021-2022.

Resolution No. __________

Page 2 ends

Section 2. That funds for this expenditure are available in the Housing Successor Agency’s Fiscal Year 2021-2022 budget in Account No. 1205-920-000-4269.

Section 3. That the current purchase order is authorized to be increased by the amount of $14,400.

Section 4. That a certified copy of this Resolution shall be filed in the offices of the City Manager, City Attorney, City Controller, Housing Successor Agency and City Clerk.

Section 5. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this day _______ of __________________, 2022.
_____________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
___________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
CITY OF COMPTON: ss
I, Alita Godwin, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the Council signed by the Mayor and attested by the City Clerk at the regular meeting thereof held on the ________ day of ____________________, 2022.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCIL MEMBERSNOES: COUNCIL MEMBERSABSENT: COUNCIL MEMBERSABSTAIN: COUNCIL MEMBERS- ___________________________________

CITY CLERK OF THE CITY OF COMPTON

FIRST AMENDMENT TO

PROPERTY MAINTENANCE SERVICES AGREEMENT

BETWEEN

NEW WEST LANDSCAPING AND

THE CITY OF COMPTON
This FIRST AMENDMENT to the Property Maintenance Services Agreement is made by and between THE CITY OF COMPTON, (hereinafter referred to as “CITY”) and NEW WEST LANDSCAPING (hereinafter referred to a “CONTRACTOR”).

RECITALS:

WHEREAS, on September 7, 2021, the City Council adopted Resolution No. 25,537, which authorized the City Manager to enter into a Property Maintenance Services Agreement with New West Landscaping for Fiscal Year 2021-22 to provide property maintenance and landscaping services on specified Housing Successor Agency-owned properties at a total compensation in the amount of $13,500.00; and
WHEREAS, pursuant to the provisions of the Property Maintenance Services Agreement, New West Landscaping is to render services which include, but are not limited to: abatement of all dumped materials and debris, weed abatement, trash removal, shrub and tree trimming, and removal and disposal of all materials abated on specified parcels on a bi-weekly basis; and WHEREAS, due to the amount of illegal dumping and rise in homeless encampments that has occurred on vacant Housing Successor Agency-owned properties, the Contractor has been called upon to provide services on a weekly basis instead of on a bi-weekly basis; and WHEREAS, the parties desire to amend the original Agreement with the Contractor to provide additional compensation in the amount of $14,400.00 to provide those additional services contracted for during the 2021-2022 Fiscal Year; and
WHEREAS, by Resolution No. ______, adopted on the ___ day of ____, 2022, the City Council authorized the City Manager to amend the Property Maintenance Services Agreement with New West Landscaping to provide additional compensation in the amount of $14,400.00 for services rendered during the 2021-2022 Fiscal Year.

WITNESSETH:

That the City and Contractor, for the consideration, terms and conditions herein described, mutually agree to amend the original Agreement as follows:

AMENDMENTS

1. The parties agree to amend Section 2 – Compensation of the original Agreement to revise the maximum amount of compensation payable to Consultant for services performed and completed pursuant to the Agreement during the 2021-2022 Fiscal Year by providing additional available compensation in the not-to-exceed amount of Fourteen Thousand Four Hundred Dollars ($14,400.00).

2. The parties agree to amend Section 3 – Commencement of Services of the original Agreement to revise the agreed compensation of $13,500 to $27,900.

3. Except as provided for above, all other terms and conditions of the original Agreement and any amendments thereto between the City and the Consultant all remain in effect.

IN WITNESS WHEREOF, the authorized representatives of the parties have executed this FIRST AMENDMENT to the above-identified PROPERTY MAINTENANCE SERVICES AGREEMENT.

First Amendment to Property Maintenance Services Agreement – New West Landscaping Housing Successor Agency Properties/Resolution No. ______ 2 NEW WEST LANDSCAPING/CONTRACTOR
Dated: _______________ By ___________________________________ Keith Dickerson, Owner

CITY OF COMPTON
Approved by:

Dated: _______________ By ____________________________________ Ronerick D. Simpson, City Manager
Approved as to form:

By _________________________________ Dated: ______________ Eric J. Perrodin, City Attorney
ATTEST:

Dated: _______________ By __________________________________ Alita Godwin, City Clerk
March 1, 2022
TO: HONORABLE MAYOR AND COUNCIL MEMBERS
FROM: CITY ATTORNEY
RE: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
COMPTON APPROVING A THREE (3) YEAR EMPLOYMENT

AGREEMENT WITH THOMAS THOMAS TO SERVE AS CITY
MANAGER OF THE CITY OF COMPTON ($221,000.00)

SUMMARY
The City Council will consider adoption of a Resolution that will approve a three (3) year (i.e., March 14, 2022 through March 13, 2025) Employment Agreement with Thomas Thomas to serve as City Manager for the City of Compton.

BACKGROUND
The Compton City Charter provides that the City Council shall appoint the City Manager of the City of Compton, who shall be chosen on the basis of his/her executive and administrative qualifications and be paid a salary commensurate with his/her responsibilities as chief administrative officer of the City. The City Manager shall be responsible to the City Council for the proper administration of all affairs of the City of Compton excepting such matters for which elective officers are made responsible by the Compton City Charter.

STATEMENT OF ISSUE
On February 15, 2022, the City Council met in closed session during a duly noticed City Council meeting and by a unanimous decision voted to appoint and offer employment to the position of City Manager of the City of Compton for a term of three (3) years to Thomas Thomas; which offer was accepted, effective as of March 14, 2022.

Mr. Thomas will bring many years of government experience, including over twenty-five (25) years of city/county management experience, including responsibilities in all phases of government operation and services.

At the request of the City Council, and in conformance with the directions provided, the professional firm of Ralph Andersen & Associates was employed to negotiate the contractual terms of the proposed Employment Agreement with Mr. Thomas.

Adoption of the attached Resolution will approve the terms and conditions of the Employment Agreement between the City and Mr. Thomas.

3. Staff Report - Resolution Approving Employment
Agreement with Thomas Thomas as City Manager
March 1, 2022, Page 2
2 The basic contractual terms of the Employment Agreement include the following:

Term: March 14, 2022 through March 13, 2025.

Compensation: $18,416.66 monthly salary (based on maximum annual salary of $221,000.00). Possible annual merit increase
of not more than a cost-of-living adjustment.

Use of City Vehicle or Monthly Auto Allowance of
$650.00.

Use of City-owned/paid cellular phone or Monthly
Allowance of $100.00.

Various Employee Benefits (e.g. CalPERS
participation; vacation, sick and personal leave
accrual; medical, dental, visual and life insurance
coverage; education reimbursement).

Severance compensation for early termination of
employment by the City.

FISCAL IMPACT
The salary range for the position of City Manager is set at Two Hundred TwentyOne Thousand Dollars ($221,000.00) in the 2021-2022 Fiscal Year budget. The salary rate for this position; which may be subject to an annual salary increase of not more than a cost-of-living adjustment, subject to the discretion of the City Council; for the remaining term of the Employment Agreement will be appropriated in future City budgets.

Compensation for the position of City Manager during the 2021-2022 Fiscal Year has been allocated within the City’s 2021-2022 Fiscal Year budget in Account No. 1001-510-000-4101.

RECOMMENDATION
It is recommended that the City Council take action on the attached Resolution.

ERIC J. PERRODIN

CITY ATTORNEY
RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON APPROVING A THREE (3) YEAR EMPLOYMENT AGREEMENT WITH

THOMAS THOMAS TO SERVE AS CITY MANAGER OF THE CITY OF
COMPTON ($221,000.00)
WHEREAS, Section 703 of the Compton City Charter provides that the City Council shall appoint the City Manager of the City of Compton; and WHEREAS, Section 705 of the Compton City Charter provides that the City Manager shall be chosen on the basis of his/her executive and administrative qualifications and be paid a salary commensurate with his/her responsibilities as chief administrative officer of the City; and
WHEREAS, Section 706 of the Compton City Charter confers upon the City Manager responsibility to the City Council for the proper administration of all affairs of the City of Compton excepting such matters for which elective officers are made responsible by the Compton City Charter; and
WHEREAS, on February 15, 2022, the City Council, during a duly noticed City Council meeting, met in closed session and by a unanimous decision voted to appoint Thomas Thomas to the position of City Manager for a term of three (3) years, effective as of March 14, 2022; and
WHEREAS, the City Council tendered an offer of employment to Thomas Thomas as City Manager of the City of Compton; which offer of employment was accepted; and desire to enter into an employment agreement with Thomas Thomas setting forth certain terms and conditions of his employment as City Manager of the City of Compton; and WHEREAS, the professional firm of Ralph Andersen & Associates; contracted for providing professional services for this matter; and the City Attorney’s Office have completed the negotiations of the contractual terms of the City Manager’s Employment Agreement and is now presenting the attached Employment Agreement for City Council action.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. That the City Council of the City of Compton hereby approves the attached Employment Agreement between the City of Compton and Thomas Thomas, confirming appointment and employment of Thomas Thomas to serve as City Manager for the City of Compton for a term effective March 14, 2022 through March 13, 2025.

Section 2. That the monthly salary payable to Thomas Thomas during the term of his services as City Manager of the City of Compton shall be Eighteen Thousand, Four Hundred Sixteen Dollars and Sixty-Six Cents ($18,416.66), unless the provisions of the Employment Agreement are amended by the affirmative vote of at least three (3) members of the City Council.

Section 3. That the funds to pay the compensation for the position of City Manager are allocated in the Fiscal Year 2021-2022 budget in Account No. 1001-510- 000-4101. Funding for the remainder of the term of the Employment Agreement shall be allocated in future City budgets.

Section 4. That a certified copy of this Resolution and the attached Employment Agreement, upon execution, shall be filed in the offices of the City Clerk, City Manager, City Attorney and the City Controller.

Section 5. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

Resolution No. __________

Page 2 ends

ADOPTED this _________ day of ____________, 2022.
________________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
____________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF COMPTON )
I, Alita Godwin, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council, signed by the Mayor, and attested by the City Clerk at the regular meeting thereof held on the __________ day of ______________, 2022.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCIL MEMBERSNOES: COUNCIL MEMBERSABSTAIN: COUNCIL MEMBERSABSENT: COUNCIL MEMBERS- ____________________________________

CITY CLERK OF THE CITY OF COMPTON

Page 1 of 11 ends

EMPLOYMENT AGREEMENT

BETWEEN

CITY OF COMPTON
AND

THOMAS THOMAS
[Position: City Manager]
This Employment Agreement is made by and between the City Council of the City of Compton (hereinafter “Council”) on behalf of the City of Compton (hereinafter “City”), and Thomas Thomas (hereinafter “Thomas” and/or “City Manager”). The City Council, City and Thomas are sometimes individually referred to as a “Party” and collectively as “Parties.”

RECITALS
WHEREAS, the Compton City Charter provides that the City Council shall appoint the City Manager of the City of Compton, who shall be chosen on the basis of his/her executive and administrative qualifications and be paid a salary commensurate with his/her responsibilities as chief administrative officer of the City; and WHEREAS, the City Manager position is vital to the daily functioning of the City’s government, requiring specialized skills and experience and pursuant to Section 706 of the Compton City Charter is responsible to the City Council for the proper administration of all affairs of the City of Compton excepting such matters for which elective officers are made responsible by the Charter; and
WHEREAS, the Parties wish to have Thomas perform the services of City Manager, an Unclassified Service position which requires specialized skills and expert professional or technical services, for a definite period of time, unless this Agreement is otherwise terminated prior thereto; and
WHEREAS, on February 15, 2022, the Council, during a duly noticed City Council meeting, met in closed session and unanimously voted to appoint Thomas to the position of City Manager of the City of Compton; and
WHEREAS, it is the desire of the City Council to establish the terms and conditions of Thomas’ services to the City through this Agreement; and WHEREAS, on March __, 2022, the Council adopted Resolution No. ______, which approved this Employment Agreement between the City and Thomas for the position of City Manager of the City.

NOW, THEREFORE, Thomas and the City, for the consideration, terms and conditions herein described, mutually agree as follows:

Section 1. Employment and Term of Service

1.1 Employment. It is understood and agreed between the Parties that the Council hereby agrees to employ Thomas in the Unclassified Service position of City Manager of the City of Compton and Thomas hereby accepts such employment.

Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 2 of 11 ends

1.2 Term of Service.
a. The term of this Employment Agreement shall begin on March 14, 2022, and shall end on March 13, 2025, unless extended in writing by mutual agreement of the Parties.
b. Thomas agrees that he shall not accept any other employment during the term of this Agreement without the express written prior consent of the City Council. In consideration of the agreed term and the other provisions of this Agreement, the Parties mutually agree to waive Compton Municipal Code Section 2-2.9 (Limitation on Removal) in all circumstances where it may otherwise apply, if any.

1.3 City Manager’s Commitments.
a. Duties and Authority.
(1) The City Manager shall be the chief executive officer of the City and be responsible to the City Council for the proper administration of all affairs of the City, excepting such matters for which elective officers are made responsible by the Compton City Charter. (2) The City Manager shall perform all of the duties of the City Manager as set forth in the Compton City Charter, the Compton Municipal Code and City policies and procedures approved by the City Council, as may be provided from time to time. The City Manager shall also perform other legally permissible and proper duties and functions as the City Council may assign from time to time.
(3) The City Council may also designate the City Manager as the chief executive officer of other City-related legal entities. Such other legal entities could include, but not be limited to financing authorities and joint powers authorities. b. Hours of Work.
(1) The City Manager is an exempt employee but is expected to engage in those hours of work that are necessary to fulfill the obligations to the City Manager’s position.

The City Manager does not have set hours of work as the City Manager is expected to be available at all times, and shall be available for attendance at City Council and other meetings as necessary. The City Manager shall be permitted such reasonable “time off” as is customary for exempt employees of the City so long as the time off does not interfere with normal business.

(2) Thomas agrees that his position is that of an exempt employee for purposes of the Fair Labor Standards Act (“FLSA”).
c. Ownership of Materials. Thomas understands and agrees that all data, studies, reports and other documents prepared by or on his behalf while performing his duties during the term of this Agreement shall be furnished to and become the property of the City, without restriction or limitation on their use. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other materials either created by or on his behalf or provided to him in connection with the performance of this Agreement shall be held confidential by Thomas Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 3 of 11 ends

to the extent permitted by applicable law, and except as may be required by any governmental agency or court of competent jurisdiction. Such materials shall not, without the prior consent of a majority of the City Council, be used by Thomas for any purposes other than the performance of his duties. Provided, further that no such materials may be disclosed to any person or entity not connected with the performance of services under this Agreement, except as required by law, any governmental agency, subpoena or an order issued by a court of competent jurisdiction.
d. Disability or Inability to Perform. In the event the City Manager becomes mentally or physically incapable of performing the City Manager’s functions and duties with reasonable accommodation and it reasonably appears such incapacity will last for more than two (2) months, the City Council may terminate the City Manager. If the City Council does elect to terminate the City Manager due to incapacity, the City Manager shall receive severance benefits provided in Section 3 below.

1.4 City Council Commitments.
a. The City Council sets policy for the governance and administration of the City and it implements its policies through the City Manager. b. The City Council commits to spending time, the frequency of which shall be determined by the City Council in its discretion, to work with the City Manager and staff on setting goals and priorities for the City government.
c. In accordance with applicable provisions of the Compton City Charter, the Compton Municipal Code and City policies and procedures, except for the purpose of inquiry, the City Council and its members shall deal with all subordinate City employees, officers, contractors and consultants solely through the City Manager or the City Manager’s designee, and neither the City Council nor any member thereof shall give orders to any subordinate of the City Manager, either publicly or privately.

Section 2. Compensation and Reimbursement
The City agrees to provide the following compensation and reimbursements to the City Manager during the term of this Employment Agreement:

2.1 Compensation. It is agreed that for the services to be rendered by Thomas pursuant to this Agreement, effective as of March 14, 2022, Thomas shall receive a monthly salary in the amount of Eighteen Thousand Four Hundred Sixteen Dollars and Sixty-Six Cents ($18,416.66), paid at the same intervals and in the same manner as regular City employees for the term of this Employment Agreement. Thomas shall be compensated on a pro-rata bases for any partial month he serves as City Manager. It is understood that the maximum salary payable per year of services rendered by Thomas, exclusive of other benefits specified within this Employment Agreement, shall not exceed Two Hundred Twenty One Thousand Dollars ($221,000.00). An annual salary increase of not more than a cost-of-living adjustment may be considered by the City Council if the City’s financial position makes such an increase feasible and is approved by the affirmative vote of at three (3) members of the City Council.

2.2 Required Employer Costs.

Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 4 of 11 ends

a. Federal Insurance Contributions Act (FICA), if applicable, to the same extent provided other City employees.
b. Unemployment Compensation to the same extent provided other City employees.
c. California Public Employees Retirement System (CalPERS).

The City contracts with the California Public Employees’ Retirement System (“CalPERS”) for retirement benefits. The City shall be responsible to pay the Employer’s (as determined by CalPERS) share for participation in the CalPERS System. The Employee (Thomas) shall be responsible at least fifty percent (50%) of the total normal cost rate or the current contribution rate of similarly situated employees, whichever is greater. Employee shall be enrolled in the 2.0% at 62 retirement formula. (The Parties to this Employment Agreement have determined that Thomas is a "New Member" upon review and interpretation of the City of Compton's Miscellaneous Employee's Memorandum of Agreement and California Government Code Section 7522.04(f) definition of "New Member."). d. The cost of any fidelity or other bonds required by law for the City Manager. e. Workers’ Compensation to the same extent provided other employees of the City.

2.3 Benefits.
a. Leave Allowances. During the term of this Employment Agreement, Thomas shall be entitled to accrue and use the following types of leave:
(1) Accumulate Personal Leave days at the rate of 10 hours per month for a maximum of 120 hours per year of employment. Personal leave days accrued may not be carried over and must be used no later than the conclusion of each calendar year (i.e.

December 31st), unless changed by City Council resolution. (2) City holidays designated pursuant to Council resolution each fiscal year.

City holidays that are designated as floating holidays may not be carried over and must be used no later than the conclusion of each fiscal year (i.e. June 30th), unless changed by City Council resolution.
(3) Accumulate Vacation Leave days at the rate of 15 hours per month for a maximum of 180 hours per year of employment. After at least one (1) year of continuous service as City Manager, Thomas shall be entitled to cash out up to eighty (80) hours of accrued, but unused vacation hours per calendar year thereafter. (4) Accumulate Sick Leave days at the rate of 10 hours per month for a maximum of 120 hours per year of employment. There shall be no limit on the number of sick leave hours that Thomas may accumulate.
b. Health Benefits.

Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 5 of 11 ends

During the term of this Employment Agreement, Thomas shall be entitled to receive the same health coverage and benefits (i.e. medical, vision, dental insurance coverage) as the Chief Executive Management Employees in the City service. c. Automobile Allowance.

During the term of this Employment Agreement, Thomas shall have at all times during his employment as City Manager with the City, exclusive use for work-related and incidental personal activities, an automobile provided to him by the City. City shall pay all liability, property damage and comprehensive insurance coverage and for the purchase, operation (including all fuels and lubricants), maintenance, repair and regular replacement of said automobile while Thomas is employed as City Manager. Alternatively, Thomas may elect to receive an automobile allowance of no less than $650 per month. Thomas shall not be entitled to both the use of a City-provided automobile and an automobile allowance. d. Cellular Phone Allowance.

During the term of this Employment Agreement, Thomas shall be entitled to receive a cellular phone allowance of $100.00 per month or a City-provided and paid cellular phone, including the cost of monthly billing charges. Thomas shall not be entitled to both a cellular phone allowance and provision of a City-provided and paid cellular phone. e. Education Reimbursement
During the term of this Employment Agreement, Thomas shall be entitled to receive the same educational reimbursement benefits as the Chief Executive Management Employees in the City service.
f. Life Insurance.

During the term of this Employment Agreement, the City shall pay, on behalf of Thomas, life insurance coverage with a principal amount of $100,000 and a conversion privilege.

2.4 During the term of this Employment Agreement, Thomas may participate in all appropriate local, state and national professional organizations, seminars, conferences and professional development courses that are reasonable and beneficial to the City. City shall pay for all reasonable associated expenses necessary for said participation.

2.5 Reimbursement for Legal Actions.

Thomas shall be fully compensated and reimbursed pursuant to Section 2.1, above, for time spent and costs incurred while representing the City in any legal action during or after the term of this Agreement.

2.6 Moving and Relocation Expense.

The City is providing in its offer of employment a moving and relocation lump-sum payment in an amount not-to-exceed Thirteen Thousand Dollars ($13,000) to Thomas. This amount will be paid to Thomas with his paycheck on the first applicable pay period.

Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 6 of 11 ends

Thomas agrees to reimburse the City if he voluntarily terminates his employment prior to the completion of two (2) years of service according to the following rates and schedule:
100% if employed for less than 6 months;
75% if employed for 6 months, but less than 12 months;
50% if employed for 12 months, but less than 18 months; 25% if employed 18 months, but less than 24 months.

Thomas also acknowledges that this payment provided for non-deductible moving and relocation expenses and will be included in his gross income as wages and subject to withholding of all applicable taxes.

I hereby certify my acceptance of the payback rates and schedule listed above and agree to reimburse the City in the event of my voluntary termination prior to the completion of two (2) years of service. I understand that my employment with the City is considered at-will, meaning that either the City or I may terminate this employment relationship at any time with or without cause, subject to any notice requirements as provided for in this agreement. ___________________________________________ _______________ Thomas Thomas, City Manager Date
Section 3. Termination or Separation

3.1 Termination. The Council may terminate Thomas’s services with or without cause, and without right of advance notice, hearing or appeal, by motion of the Council adopted by at least three affirmative votes pursuant to section 703 of the Compton City Charter, at any time during the term of this Employment Agreement.
a. In the event that Thomas is terminated without cause by the Council prior to the expiration of this Employment Agreement, he shall be entitled to receive severance compensation as follows:
(1) If terminated within the first twelve (12) months of this Employment Agreement, Thomas shall be entitled to receive severance compensation equal to twelve (12) month’s salary, in addition to the full monetary value of any earned but unused vacation leave accumulated during the period of his service pursuant to this Employment Agreement. Thomas’s entitlement to earned, but unused sick leave accumulated during the period of his service shall be governed by those provisions applicable to Chief Executive Management Employees in the City service.
(2) If terminated within any time after the first twelve (12) month of this Employment Agreement, Thomas shall be entitled to receive severance compensation equal to six (6) month’s salary, in addition to the full monetary value of any earned but unused vacation leave accumulated during the period of his service pursuant to this Employment Agreement. Thomas’s entitlement to earned, but unused sick leave accumulated during the period of his service shall be governed by those provisions applicable to Chief Executive Management Employees in the City service.

Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 7 of 11 ends

(3) If terminated at any time during the term of this Employment Agreement due to his committing of any act of misfeasance or malfeasance, or due to the filing by any government agency with appropriate authority, of a criminal complaint charging him with any felony or misdemeanor involving moral turpitude, then the City shall only be obligated to pay the full monetary value of any earned but unused vacation accumulated during the period of his service pursuant to this Employment Agreement.

3.2 Voluntary Separation. Thomas may terminate this Agreement at any time with or without cause, provided however, that he shall reasonably provide the City Council with at least ninety (90) days advance written notice prior to the effective date of the termination, if practicable, unless the Parties mutually agree in writing to a shorter period.

3.3 Transfer of Responsibilities. After Notice of Voluntary Separation or Termination, Thomas shall cooperate with the City, as requested by the City, to effect a transition of City Manager responsibilities and duties and ensure that the City is aware of all matters being handled by Thomas.

Section 4. Assembly Bill 1344 Provisions

4.1 The Parties agree to fully comply with the California Government Code sections that are part of AB 1344 (Government Code Section 53243), made effective January 1, 2012, and to fully comply with other applicable law as it exists as of the date of execution of this Agreement and as it may be amended from time to time thereafter.

4.2 AB 1344 generally provides limits on local agency employee reimbursement requirements. These provisions are included in the following California Government Code sections, which are hereby incorporated into the terms of this Agreement:
(a) Section 53243. Reimbursement of paid leave salary. The City shall be fully reimbursed any paid leave salary paid to the City Manager pending an investigation if the City Manager is convicted of a crime involving an abuse of office or position; as defined by Section 53243.4.
(b) Section 53243.1. Reimbursement of legal criminal defense funds. The City shall be fully reimbursed any funds provided for the legal defense of the City Manager if the City Manager is convicted of a crime involving an abuse of office or position; as defined by Section 53243.4.
(c) Section 53243.2. Reimbursement of cash settlement. The City shall be fully reimbursed any cash settlement related to the termination of the City Manager if the City Manager is convicted of a crime involving an abuse of office or position; as defined by Section 53243.4.
(d) Section 53243.3. Reimbursement of non-contractual payments. If, in the absence of a contractual obligation, the City provides payments described above, the City shall be fully reimbursed any such payments if the City Manager is convicted of a crime involving an abuse of office or position; as defined by Section 53243.4.

Thomas has reviewed, is familiar with, and agrees to comply fully with each of these provisions if any of these provisions are applicable to Thomas, including that Thomas Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 8 of 11 ends

agrees that any cash settlement related to the termination that Thomas may receive from the City shall be fully reimbursed to the City if Thomas is convicted of a crime involving an abuse of his office or position.

4.3 AB 1344 also includes California Government Code Section 3511.2.

Notwithstanding any other provisions of this Agreement, it shall be prohibited for the City or through the Agreement or any amendment thereto to provide an automatic renewal hereof that provides for an automatic compensation increase in excess of a cost-of-living adjustment or a maximum cash settlement in excess of certain limits established by Section 3511.2.

Government Code, Section 3511.2 is hereby incorporated into the terms of this Agreement.

Section 5. General Provisions

5.1 Amendments. This Employment Agreement may be amended in writing, signed by Thomas, the majority of the Council and “Approved As To Form” by the City Attorney.

5.2 Conflict of Interest.
a. The City Manager shall not engage in any business or transaction or shall have a financial or other personal interest or association, direct or indirect, which is in conflict with the proper discharge of official duties or would tend to impair independence of judgment or action in the performance of official duties. Personal as distinguished from financial interest includes an interest arising from blood or marriage relationships or close business, personal or political associations.
b. The City Manager shall also comply with the conflict of interest provisions of the California Government Code and any Conflict of Interest Code applicable to the City Manager’s City employment.
c. The City Manager is responsible for submitting to the City Clerk the appropriate Conflict of Interest Statements at the time of appointment, during employment and at the time of separation from the position.

5.3 Indemnification. In accordance with and to the extent provided by California’s Tort Claims Act (Government Code Section 825 et seq.) and Government Code Sections 995-996.5, the City shall defend and indemnify Thomas against and for all losses sustained by Thomas in direct consequences of the discharge of the City Manager’s duties on the City’s behalf for the period of the City Manager’s employment. This section shall not apply and the City shall not be obligated to indemnify or represent Thomas in any legal matters if the City Council determines that the defense of the action or proceeding by the City would create a conflict of interest between the City and Thomas; or for acts or failure to act because of fraud, corruption or actual malice without entering into a reimbursement agreement with the City approved by the City Council in a form approved by the City Attorney. If the City Council or court of competent jurisdiction determines that Thomas committed actual fraud, corruption or actual malice, then the City shall not provide for the defense of such legal action and Thomas shall reimburse the City all costs plus interest to the City in providing such defense. This section shall also apply to any intentional tort or crime committed by Thomas, to any action outside the course and scope of the services provided by Thomas under this Agreement, or any other intentional or malicious conduct or gross negligence of Thomas.

Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 9 of 11 ends

5.4 Effect of Waiver. The failure of either party to insist on strict compliance with any of the terms, covenants or conditions of this Agreement by the other party shall not be deemed a waiver of that term, covenant or condition, nor shall any waiver or relinquishment of any right or power at any one time or times be deemed a waiver or relinquishment of that right or power for all or any other times.

5.5 Entire Agreement. The terms and conditions of this Agreement represent the entire understanding between the City and Thomas regarding Thomas’s employment as the City Manager, and all preliminary negotiations and agreements are deemed a part hereof.

No verbal agreement or implied covenant shall be held to vary the provisions of this Agreement.

5.6 Independence of Parties. Each party hereto has had the opportunity to receive independent legal advice with respect to the contents and advisability of making this Employment Agreement and executes this Agreement after having the opportunity to consult with legal counsel.

No provision of this Employment Agreement shall be interpreted for or against any party because that party or his/its legal representative drafted the provisions. This Agreement shall be deemed to have been drafted by all parties hereto. Each party hereto expressly covenants that the terms of this Employment Agreement are fair and have been freely negotiated by and between each of the parties.

5.7 Arbitration of Salary Dispute. Should a dispute arise between the parties hereto specifically concerning the amount of salary or period for which salary is to be paid, the parties agree that the dispute shall be submitted to binding arbitration. Such arbitration shall be conducted by a mutually agreed arbitrator. Each party hereto shall bear one-half of the costs of the arbitration, except each party shall bear their own costs for legal representation and witness fees. The parties agree that any disputes resolved by arbitration shall be final and binding. Any other disputes arising out of Thomas’s employment as City Manager, not specifically referenced herein, shall not be subject to the provisions of this section.

5.8 Severability. If any provision, or any portion thereof, contained in this Employment Agreement is held to be unconstitutional, invalid, or unenforceable, the remainder of this Employment Agreement, or portion thereof, shall be deemed severable, shall not be affected, and shall remain in full force and effect.

5.9 Jurisdiction and Venue. This Employment Agreement shall be construed in accordance with the laws of the State of California, and the Parties agree that venue shall be in Los Angeles County, California.

5.10 Notice. Any notice, amendments or additions to this Employment Agreement, including change of address during the term of this Agreement, which the City Manager or the City shall be required, or may desire, to make shall be in writing and shall be sent by prepaid first class mail or hand-delivered to the respective Parties as follows:

If to the City: City Clerk
City of Compton
205 South Willowbrook Avenue
Compton, California 90220
Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 10 of 11 ends

With copy to: City Attorney
City of Compton
205 South Willowbrook Avenue
Compton, California 90220
If to the City Manager: Thomas Thomas, City Manager
‘ City of Compton
205 South Willowbrook Avenue
Compton, California 90220
[or other address provided in writing to the
City Clerk and City Attorney]

6.0 Effective Date. This Employment Agreement shall become effective March 14, 2022, on approval of the City Council and signed by a majority of the City Council members, Thomas, the City Clerk and the City Attorney.

IN WITNESS WHEREOF, the Parties have executed this Employment Agreement. _______________________________ Dated: _______________
Thomas Thomas
City of Compton
A Municipal Corporation
Dated: _______________ ____________________________________ Emma Sharif, Mayor
Dated: _______________ ____________________________________ Michelle Chambers, Council Member
First Council District
Dated: _______________ ____________________________________ Isaac Galvan, Council Member
Second Council District
Employment Agreement – Thomas Thomas
City Manager Position – Effective 03/14/22 – 03/13/25
[Resolution No. ]

Page 11 of 11 ends

Dated: _______________ ___________________________________ Jonathan Bowers, Council Member
Third Council District
Dated: _______________ ___________________________________ Lillie Darden, Council Member
Fourth Council District
Approved as to form:

By ______________________________ Dated: _________________ Eric J. Perrodin, City Attorney
ATTEST:

Dated: _______________ By _________________________________ Alita Godwin, City Clerk
February 22, 2022
TO: MAYOR AND COUNCIL MEMBERS
FROM: CITY MANAGER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ISSUE ANNUAL PURCHASE
ORDERS TO INSIGHT PUBLIC SECTOR, INC. FOR MICROSOFT
SOFTWARE LICENSES COVERING A THIRTY SIX (36) MONTH TERM

IN AN AMOUNT NOT TO EXCEED TWO HUNDRED FOURTEEN

THOUSAND NINE HUNDRED AND EIGHTY-FOUR DOLLARS
($214,984.00)

SUMMARY
Adoption of this resolution will authorize the City Manager to accept the proposal of Insight Public Sector, Inc. (“Insight”), create a purchase order in an amount not to exceed Seventy One Thousand Six Hundred and Sixty-Two dollars ($71,662.00) per fiscal year and execute any supporting documents for the purchase of Microsoft Corporation Software Licenses.

BACKGROUND
The Internal Services Department oversees purchasing and maintaining software licenses to support the City’s computer network. The Microsoft Windows Software License is one of the main licenses needed to sustain the network since the system (servers, desktops, software, etc.) is a Windows-based platform. The current licenses were purchased through an agreement with SHI International, Inc. under Resolution No. 25,503 during the June 22, 2021, City Council Meeting. The current agreement has a one-year term, and the licenses are set to expire at the end of February 2022.

In anticipation of the renewal, staff conducted a thorough assessment of the current and future needs of the City’s licensing needs and has ascertained that three hundred (300) license renewals are needed to maintain the computer network. Software licenses are not issued directly through Microsoft, Inc., but through authorized retailers that supply technical support as well as the licenses.

STATEMENT OF ISSUE
The Internal Services Department solicited proposals for the purchase of Microsoft Corporation Software Licenses. The following proposals were received:

4. Staff Report – Resolution Authorizing Purchase Order INSIGHT PUBLIC SECTOR, INC. / Renewal of Microsoft Licenses February 22, 2022, Page 2

COMPANIES PROPOSAL AMOUNT ANNUAL AMOUNT
Insight Public Sector Inc. $214,983.39 $71,662.00
Crayon $222,351.15 $74,118.00
SHI International Corporation $231,956.43 $77,319.00
Staff has reviewed the proposals and determined that Insight Public Sector, Inc. provided the best proposal for licensing at $214,984.00, or $71,662.00 annually.

The proposals are based on a three-year term and will span from March 2022 through February 2025. Staff recommends that the City Council approve the proposed resolution and authorize the City Manager to issue a purchase order for the next three fiscal years in an amount not to exceed $71,662.

ALTERNATIVE
None proposed.

FISCAL IMPACT
Funds for this expenditure are available in the 2021-2022 Fiscal Year budget of the Internal Services Department in Account No. 1001-620-IT0-4222 ($71,662) and will be budgeted the 2022-2023 and 2023-2024 Fiscal Year Budgets.

RECOMMENDATION
It is staff’s recommendation that the City Council adopt the attached Resolution.

RONERICK SIMPSON

CITY MANAGER
RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ISSUE ANNUAL PURCHASE
ORDERS TO INSIGHT PUBLIC SECTOR, INC. FOR MICROSOFT
SOFTWARE LICENSES COVERING A THIRTY SIX (36) MONTH TERM

IN AN AMOUNT NOT TO EXCEED TWO HUNDRED FOURTEEN

THOUSAND NINE HUNDRED AND EIGHTY-FOUR DOLLARS
($214,984.00)
WHEREAS, the Internal Services Department recommends purchase of Microsoft Corporation Software Licenses that are used for City network infrastructure as it is a Windows-based platform; and
WHEREAS, the current set of licenses were purchased through SHI International, Inc. via Resolution No. 25,503 during the June 22, 2021 Council Meeting and set to expire at the end of February 2022 and need to be renewed to remain in compliance with Microsoft Corporation regulations; and
WHEREAS, the cost to bring the City in compliance with Microsoft is $214,983.39, or $71,662 per year. The City will pay Insight Public Sector, Inc., a direct distributor for Microsoft Corporation $71,662, this current fiscal year, to bring the City current with all Microsoft Software Licenses. These licenses will be valid from March 1st, 2022 to February 28, 2025; and
WHEREAS, The Internal Services Department solicited proposals for the purchase of Microsoft Corporation Software Licenses. The following three proposals were received:

COMPANIES

PROPOSAL

AMOUNT ANNUAL
AMOUNT
Insight Public Sector Inc. $214,983.39 $71,662.00
Crayon $222,351.15 $74,118.00
SHI International Corporation $231,956.43 $77,319.0
WHEREAS, Staff has reviewed the proposals and has determined that Insight Public Sector, Inc. provided the best proposal in the amount of $214,983.39; and WHEREAS, resolution number 25,001 dated April 23, 2019 states a purchase order in amount greater than $25,000.00 must be submitted to the City Council by resolution for approval.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. That the proposal for INSIGHT Public Sector INC. in the amount of Two Hundred and Fourteen Thousand Nine Hundred and Eighty-Three Dollars and Thirty-Nine Cents ($214,983.39), for purchase of Microsoft Software Licenses is hereby accepted and all other proposals are rejected.

Section 2. That the City Manager is authorized to issue a purchase order to Insight Public Sector, Inc. in the amount not to exceed $71,662.00 per fiscal year.

Section 3. That funds for these expenditures are available in the Fiscal Year 2021-2022 Budget in Account No. 1001-620-IT0-4222. Funding for the remaining years will be allocated in future City budgets.

Section 4. That a copy of this Resolution shall be filed in the offices of the City Clerk, City Attorney, City Manager, Internal Services and the City Controller.

RESOLUTION NO. _________________

Page 2 ends

Section 5. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this _________ day of _________________, 2022.

MAYOR OF THE CITY OF COMPTON
ATTEST:
___________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF COMPTON )
I, Alita Godwin, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council of the City of Compton, signed by the Mayor and attested by the City Clerk at a regular meeting thereof held on this ________ day of ________________, 2022.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCILMEMBERSNOES: COUNCILMEMBERSABSTAIN: COUNCILMEMBERSABSENT: COUNCILMEMBERS- ___________ ___

CITY CLERK OF THE CITY OF COMPTON

March 1, 2022
TO: HONORABLE MAYOR AND COUNCIL MEMBERS
FROM: FIRE CHIEF
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT

WITH EMERGENCY PLANNING CONSULTANTS (EPC) TO REVISE
AND UPDATE THE CITY’S HAZARD MITIGATION PLAN ($45,000)
AND TO AMEND THE FISCAL YEAR 2021-2022 REVENUE BUDGET

TO APPROPRIATE ANTICIPATED GRANT REVENUE OF THIRTY
THREE THOUSAND SEVEN HUNDRED FIFTY DOLLARS ($33,750.00)

SUMMARY
The attached Resolution authorizes the City Manager to enter into an agreement with Emergency Planning Consultants to revise and update the City’s Natural Hazard Mitigation Plan.

BACKGROUND
Hazard mitigation planning reduces loss of life and property by minimizing the impact of disasters. It begins with state, tribal and local governments identifying natural disaster risks and vulnerabilities that are common in their area. After identifying these risks, longterm strategies are developed for protecting people and property from similar events.

Mitigation plans are key to breaking the cycle of disaster damage and reconstruction.

Pursuant to the Disaster Mitigation act of 2000, local government agencies must adopt a Hazard Mitigation Plan and update it every five years to remain eligible for various pre-and-post disaster grants and community assistance from the Federal Emergency Management Agency (FEMA). The City adopted a Natural Hazard Mitigation Plan and updated the Plan on December 13, 2011. The Plan has since expired on April 11, 2016, and needs to be updated as soon as possible. Failure to do so may have a detrimental financial impact on the City.

The Compton Fire Department submitted a grant proposal to California Operations Emergency Services (Cal OES) to receive a reimbursement for Seventy-Five (75%) percent of the cost for the update and completion of the City’s Hazard Mitigation Plan; the proposal was approved December 19, 2019.

5. STATEMENT OF THE ISSUE
On November 18, 2020, Staff published a Request for Proposals (RFP) to solicit formal bids and received the following quotes: IEM ($33,710.71); Emergency Planning Consultants ($45,000.00); Interwest Consulting Group ($45,000.00); AARC Consultants, LLC ($61,895.00); and CMTS, LLC ($44,640.00).

Earlier this year, staff reached out to the above vendors and asked if the proposals submitted and opened on January 14, 2021 were still valid due to the time delay for the completion of the selection process along with completing the staff report and resolution. To wit: Emergency Planning Consultants ($45,000.00) and AARC Consultants, LLC ($61,895.00) have confirmed to be the same. The remaining three (3) vendors, IEM ($33,710.71), Interwest Consulting Group ($45,000.00) and CMTS, LLC ($44,640.00), informed us that the proposals submitted would need to be amended and are no longer valid. These vendors also indicated that their respective amended proposals would be higher than their initial proposals.

After reviewing all of the proposals, staff has determined that Emergency Planning Consultants (EPC) was the lowest and most responsible bidder and that the needs of the Department would best be met by contracting with Emergency Planning Consultants (EPC). EPC has done extensive work with writing FEMA-approved Hazard Mitigation Plans in Southern California; including 16 out of 25 cities in Area E. EPC also successfully facilitated the City’s prior and existing Natural Hazard Mitigation Plans and already has the knowledge about our organizational features and characteristics of Compton.

City Council approval is needed because the expenditure is in excess of $5,000.00 Dollars.

FINANCIAL IMPACT
The total cost for this update is Forty-Five Thousand Dollars ($45,000.00). Funds for this expenditure is available in the 2021-2022 Fiscal Year budget in Account No. 1001- 690-000-4269.

Once completed, the City will be reimbursed Thirty-Three Thousand Seven Hundred Fifty Dollars and Zero Cents ($33,750.00) and will be deposited under “Other State Grants” in Account No. 1001-000-0000-3569, which we would like to request an appropriation to amend the Revenue Budget for this account in the FY 2021-2022 Budget. The City’s portion of 25% of the cost is Eleven Thousand Two-Hundred Fifty Dollars and Zero Cents ($11,250.00). These funds are available in the 2021-2022 Fiscal Year budget in Account No. 1001-690-000-4269.

RECOMMENDATION
It is recommended that the City Council approve the attached resolution.

RONERICK D. SIMPSON

CITY MANAGER
RESOLUTION NO. _________________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH

EMERGENCY PLANNING CONSULTANTS (EPC) TO REVISE AND UPDATE THE CITY’S HAZARD MITIGATION PLAN ($45,000) AND TO AMEND THE FISCAL YEAR 2021-2022 REVENUE BUDGET TO APPROPRIATE

ANTICIPATED GRANT REVENUE OF THIRTY THREE THOUSAND SEVEN HUNDRED FIFTY DOLLARS ($33,750.00)
WHEREAS, prior to November 1, 2004, every state, county, city and special district must submit a Natural Hazard Mitigation Plan to prevent the consequences of and plan for natural disasters as mandated in the Disaster Mitigation Act of 2000 (DMA 2000); and
WHEREAS, the City of Compton’s Natural Hazard Mitigation Plan was completed in 2011, and Local Multi-Hazard Mitigation Planning Guidance §201.6(c)(4)(i) requires that all Hazard Mitigation Plans be reviewed and updated every five years; and WHEREAS, any affected jurisdiction that fails to meet this requirement runs the risk of not being properly reimbursed for natural disasters by FEMA; and WHEREAS, in an effort to ensure that the City’s Natural Hazard Mitigation Plan update is completed in an expeditious manner and results in a document that is acceptable to State and Federal officials, staff has determined that the hiring of a consultant would be preferable; and
WHEREAS, on November 18, 2020, Staff published a Request for Proposals (RFP) to solicit formal bids and received the following quotes: IEM ($33,710.71); Emergency Planning Consultants ($45,000.00); Interwest Consulting Group ($45,000.00); AARC Consultants, LLC ($61,895.00); and CMTS, LLC ($44,640.00); and WHEREAS, earlier this year, staff reached out to the above vendors and asked if the proposals submitted and opened on January 14, 2021 were still valid due to the time delay for the completion of the selection process along with completing the staff report and resolution. To wit: Emergency Planning Consultants ($45,000.00) and AARC Consultants, LLC ($61,895.00) have confirmed to be the same. The remaining three (3) vendors, IEM ($33,710.71), Interwest Consulting Group ($45,000.00) and CMTS, LLC ($44,640.00), informed us that the proposals submitted would need to be amended and are no longer valid; and
WHEREAS, after reviewing all of the proposals, staff has determined that Emergency Planning Consultants (EPC) was the lowest and most responsible bidder and that the needs of the Department would best be met by contracting with Emergency Planning Consultants (EPC); and
WHEREAS, EPC has done extensive work with writing FEMA-approved Hazard Mitigation Plans in Southern California; including 16 out of 25 cities in Area E. EPC also successfully facilitated the City’s prior and existing Natural Hazard Mitigation Plans and already has the knowledge about our organizational features and characteristics of Compton; and
WHEREAS, staff has recommended that the City enter a contract with Emergency Planning Consultants (EPC) to revise and update the City’s Hazard Mitigation Plan at a cost of Forty-Five Thousand Dollars ($45,000); and WHEREAS, staff was awarded a grant from Cal OES that would pay SeventyFive Percent (75%) of the fees in the amount of Thirty-Three Thousand Seven Hundred Fifty Dollars and Zero Cents ($33,750.00), once it is completed; and WHEREAS, funds in the amount of Forty-Five Thousand Dollars and Zero Cents ($45,000.00) will be available for this expenditure in Account No. 1001-690-000-4269.

RESOLUTION NO. _____________

Page 2 ends

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the City Manager is authorized to enter into a contract with and issue a purchase order in an amount not to exceed Forty-Five Thousand Dollars and Zero Cents ($45,000.00) to Emergency Planning Consultants for services up to and including the preparation of the City’s Natural Hazard Mitigation Plan revision and update in accordance with the Disaster Management Act of 2000.

SECTION 2. That funds for this expenditure is available in the Fire Department’s 2021-2022 Fiscal Year budget in Account No. 1001-690-000-4269.

SECTION 3. That Cal OES will reimburse the City in the amount of Thirty-Three Thousand Seven Hundred Fifty Dollars and Zero Cents ($33,750.00) for the completion of the update.

SECTION 4. That the funds of the reimbursement be deposited under “Other State Grants” in Account No. 1001-000-000-3569, and where the revenue budget for FY2021-2022 shall be amended to reflect the added appropriation of Thirty-Three Thousand Seven Hundred Fifty Dollars and Zero Cents ($33,750.00).

SECTION 5. That a copy of this resolution shall be forwarded to the offices of the City Clerk, City Manager, City Attorney, City Controller and the Fire Department.

SECTION 6. That the Mayor shall sign and the City Clerk shall attest to the adoption of this resolution.

ADOPTED this _________ day of __________________________ 2022. _______________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
___________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
CITY OF COMPTON: ss
I, Alita Godwin, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council, signed by the Mayor, and attested by the City Clerk at a regular meeting thereof held on the _______ day of ________________, 2022.

That the Resolution was adopted by the following vote, to wit:

AYES: COUNCIL MEMBERSNOES: COUNCIL MEMBERSABSENT: COUNCIL MEMBERSABSTAIN: COUNCIL MEMBERS- ___________________________________
RESOLUTION NO. _____________

Page 2 ends

CITY CLERK OF THE CITY OF COMPTON

March 1, 2022
TO: MAYOR AND CITY COUNCIL
FROM: CITY MANAGER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

COMPTON AUTHORIZING THE CITY MANAGER TO ENTER

INTO A THIRD AMENDMENT TO THE PROFESSIONAL

SERVICES AGREEMENT WITH AND ESTABLISH A PURCHASE

ORDER FOR INTERWEST CONSULTING GROUP TO PROVIDE

ON-CALL CIVIL AND TRAFFIC ENGINEERING SERVICES
($343,520)

SUMMARY
Staff is recommending the City Council adopt the attached resolution authorizing the City Manager to enter into a third (3rd) amendment to the professional services agreement with Interwest Consulting Group to continue to provide on-call civil and traffic engineering services to the Public Works (Engineering) Department and establishing a purchase order in the amount not to exceed Three Hundred Forty Three Thousand Five Hundred and Twenty Dollars ($343,520).

BACKGROUND
The City’s Public Works (Engineering) Department (“Department”) is responsible for, among other matters, performing civil and engineering services on behalf of the City, including assuring the successful and timely completion of many government and private projects within the City. Due to the voluminous nature of the projects and assignments and the insufficient number of personnel, for certain services and projects, the Department needs to employ the expert services of an independent consultants.

On July 21, 2020, pursuant to Resolution No. 25,321, City Council authorized the City Manager to enter into a professional services agreement with Interwest Consultant Group in the amount of $150,000 to assist the Department by providing on-call and traffic engineering services.

On April 13, 2021, pursuant to Resolution No. 25,445, City Council authorized the City Manager to enter into an amendment to the professional services agreement (1st Amendment) with Interwest Consulting Group (“Interwest”) in the amount of $175,000 to assist the Department by providing the following on-call and traffic engineering services:

6. Staff Report – Resolution Authorize 3rd Amendment
Agreement with Interwest Consulting Group
(On-Call) Civil and Traffic Engineering Services
March 1, 2022, page 2 of 4
 Review and provide recommendations for implementation of the Capital Improvement Project #18-01 – Phase 1 and Phase 2.
 Review and provide recommendations and/or approvals for Traffic Impact Analyses for public and private projects
 Perform warrant studies for traffic signal and/or stop sign installations (including field review, research and review collision data, and provide recommendations). Conformance with Federal, state and local regulations, particularly the California Manual on Uniform Traffic Control Devices requirements and general compliance with City standards, ordinances and regulations
 Consultant will stamp and wet sign the approval of ALL engineering documents/plans/maps for accuracy and adequacy
 GIS mapping
 Conceptual Engineering and presentations for Grants and Regional Transportation Planning
 Develop Traffic Control Plans for Capital Improvement Projects On November 2, 2021, pursuant to Resolution No. 25,572, City Council authorized the City Manager to enter into an amendment to the professional services agreement (2nd Amendment) with Interwest Consulting Group (“Interwest”) in the amount of $269,292.50 to provide on-call and traffic engineering services.

Said on-call and engineering assistance services were authorized to be performed until the agreed compensation amount of $269,292.50 was exhausted, at which time the agreement would terminate.

STATEMENT OF ISSUE
The previously agreed upon compensation of $269,292.50 has been exhausted, however, the Department’s need for assistance still exist due to staffing shortages and lack of adequate in-house expertise. Thus staff is requesting to amend the current agreement with Interwest to continue to provide assistance as-needed and for specific projects, which include, but are not limited to the following:

1. Artesia Boulevard Bridge Closure Project Mitigation for Compton

2. Rosecrans Bridge Mitigation (Financial Assistance)

3. Street Renaming Projects

4. Coordinating of the United States Army Core of Engineers (“USACE”) regarding the fence below the Artesia bridge for repair and clean-up of the area adjacent to Compton Creek

5. Annual Residential Street Rehabilitation – CIP #`18-01 Phase 2 (Design & Construction Services)

6. Compton Boulevard Corridor (Willowbrook Avenue to Central Avenue) HSIP Cycle 8 grant
Staff Report – Resolution Authorize 3rd Amendment
Agreement with Interwest Consulting Group
(On-Call) Civil and Traffic Engineering Services
March 1, 2022, page 3 of 4

7. Compton Boulevard Corridor (Willowbrook Avenue to East City Limits) HSIP Cycle 7 grant

8. 20 Pedestrian Heads – Request For Proposal, Construction Implementation

9. Compton Boulevard over Compton Creek Projects

10.Multi-Grade Crossing at 408 & 412 Alondra (Horse Crosswalk) Project

11.SR-91/Central Metro Project Development for Compton with Gateway Cities/Metro

12.Release of Bonds from Development projects

13.Los Angeles Permit Group

14.Private Development Projects including:
a. 1650 West 134th Street Vacation Case No. 20-001
b. 2320 North Parmelee Avenue Grading and Civil Plans
c. Gas Company 27” L765 Project on Atlantic Avenue and Linsley Street d. 927 Santa Fe Avenue Grading/Drainage Plan
e. 439 Carlin Avenue
f. 2600 Wilmington Avenue
g. 809 Pine Street – PC3
h. 15200 Gibson Avenue
i. 308 East Compton Boulevard
j. 1950 North Central Avenue
k. 701 North Wilmington Avenue – School Site
l. KBK Development – 501/601 E. Compton Blvd.
m. LandSpire Development – 1434 W. Compton Blvd.
n. Olson Development – 250 N. Central Ave. & 1950 N. Central Ave.

15.Intelligent Transportation System (“ITS”) coordination with Metro (signal projects)

16.Industrial Waste Permits

17.Atlantic Corridor Master Plan

18.I-710 TAC coordination for Early Action Funding of future projects in Compton

19.Integrated Corridor Management (“ICM”) Project for Compton

20.Traffic Engineering including assisting with City policy and implementation of speed bumps, stop signs, permit studies, street renaming, etc.

21.Construction Management and Inspection Services for Fire Stations Nos. 1 through 4 Driveway and Apron Improvement Project (CIP# 20-01) Interwest is uniquely qualified to perform civil and traffic engineering services and project management services for the City. Interwest currently provides municipal engineering, transportation planning, program and project management, and Geographic Information Systems (“GIS”) services.

Staff Report – Resolution Authorize 3rd Amendment
Agreement with Interwest Consulting Group
(On-Call) Civil and Traffic Engineering Services
March 1, 2022, page 4 of 4
Given Interwest’ s engineering expertise and management of capital improvement projects, coupled with the reduction of City workforce and lack of expertise in City staff, it is recommended that the City amend the agreement with Interwest to continue providing civil and traffic engineering consultant services to the Department.

FISCAL IMPACT
Funding in the amount not to exceed Three Hundred and Forty Three Thousand Five Hundred Twenty Dollars ($343,520) for this expenditure are available in Account No. 1004-610-000-4269.

RECOMMENDATION
Staff recommends the City Council adopt the attached Resolution.

JOHN STRICKLAND, PROJECT MANAGER

PUBLIC WORKS ENGINEERING DEPARTMENT
APPROVED FOR FORWARDING:

RONERICK D. SIMPSON

CITY MANAGER
RESOLUTION NO. _____________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO A THIRD

AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH

AND ESTABLISH A PURCHASE ORDER FOR INTERWEST CONSULTING

GROUP TO PROVIDE ON-CALL CIVIL AND TRAFFIC ENGINEERING
SERVICES ($343,520)
WHEREAS, the City’s Public Works (Engineering) Department (“Department”) is responsible for, among other matters, performing civil and engineering services on behalf of the City, including assuring the successful and timely completion of many government and private projects within the City; and
WHEREAS, due to the voluminous nature of the projects and assignments and the insufficient number of personnel, for certain services and projects, the Department needs to employ the expert services of independent consultants; and WHEREAS, on July 21, 2020, pursuant to Resolution No. 25,321, City Council authorized the City Manager to enter into a professional services agreement with Interwest Consultant Group in the amount of $150,000 to assist the Department by providing on-call and traffic engineering services; and WHEREAS, on April 13, 2021, pursuant to Resolution No. 25,445, City Council authorized the City Manager to enter into an amendment to the professional services agreement (1st Amendment) with Interwest Consulting Group (“Interwest”) in the amount of $175,000 to assist the Department by providing on-call and traffic engineering services; and
WHEREAS, on November 2, 2021, pursuant to Resolution No. 25,572, City Council authorized the City Manager to enter into an amendment to the professional services agreement (2nd Amendment) with Interwest Consulting Group (“Interwest”) in the amount of $269,292.50 to provide on-call and traffic engineering services; and WHEREAS, said on-call and engineering assistance service were authorized to be performed until the agreed compensation amount of $269,520.50 was exhausted, at which time the agreement would terminate; and
WHEREAS, the agreed upon compensation of $269,520.50 has been exhausted; however, the Department’s need for assistance still exist due to staffing shortages and lack of adequate in-house expertise and thus staff is requesting to amend the current agreement with Interwest to continue to provide assistance as-needed and for specific projects; and
WHEREAS, Interwest is uniquely qualified to perform civil and traffic engineering services and project management services for the City and given Interwest’ s engineering expertise and management of capital improvement projects, coupled with the reduction of City workforce and lack of expertise in City staff, it is recommended that the City amend the agreement with Interwest to continue providing civil and traffic engineering consultant services to the Department at a cost not-to-exceed $343,520; and WHEREAS, funding for this expenditure in the amount of Three Hundred Forty Three Thousand Five Hundred Twenty Dollars are available in Fiscal Year 2021-2022 budget in Account No. 1004-610-000-4269.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the City Manager, on the advice and approval of the City Attorney is hereby authorized to enter into a Third (3rd) Amendment to the professional services agreement with Interwest Consulting Group to continue to provide on-call civil and traffic engineering consultant services to the Public Works (Engineering) Department.

Resolution No. __________

Page 2 ends

SECTION 2. That a purchase order in the amount of $343,520 is hereby authorized to be established for Interwest Consulting Group.

SECTION 3. That funds in the amount of $343,520 are available in the Fiscal Year 2021-2022 budget in Account No. 1004-610-000-4269.

SECTION 4. That copies of this Resolution shall be filed in the offices of the City Manager, City Controller, City Clerk, City Attorney and the Public Works (Engineering) Department.

SECTION 5. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this _________ day of _____________, 2022.
________________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
____________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
CITY OF COMPTON: ss
I, Alita Godwin, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Compton, signed by the Mayor and attested by the City Clerk, at a regular meeting thereof, held on the ____________ day of ________________, 2022.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCILMEMBERSNOES: COUNCILMEMBERSABSTAIN: COUNCILMEMBERSABSENT: COUNCILMEMBERS- ___________________________________

CITY CLERK OF THE CITY OF COMPTON
January 13, 2022
Michael L. Antwine II
Assistant City Manager
City of Compton
205 S. Willowbrook Ave.

Compton, CA 90220
Re: Letter Proposal for Extension of On-Call Civil Engineering and Traffic Services Dear Mr. Antwine,
We are pleased to present this letter of proposal to the City of Compton for estimated costs of Interwest services for (i) The Four (4) Fire Stations Aprons Project; (ii) Public Works Director and City Engineer Advisory Support; (iii) Plan Review Services; and (iv) Traffic Engineering Services. We understand that the work will be on an as-needed basis; however, should you desire additional support, we would be happy to assist you with that as well. Below, please find the schedules of costs as per discussions with Ernesto Munoz.

Schedules are calculated retroactively from January 1, 2022 and are forecasted through June 30, 2022.

The sum totals of all scheduled estimates through the specified period is $343,520.

FOUR (4) FIRE STATIONS APRONS IMPROVEMENT PROJECT

CLASSIFICATION TIME REQUIREMENT HOURLY BILLING RATE ESTIMATED COST Inspector 25 Weeks x 8 Hrs Per Day $135 $135,000
Construction Manager 26 Weeks x 10 Hrs Per Wk $160 $41,600 CM Support 26 Weeks x 8 Hrs Per Wk $95 $19,760

PUBLIC WORKS DIRECTOR/CITY ENGINEER SUPPORT

CLASSIFICATION TIME REQUIREMENT HOURLY BILLING RATE ESTIMATED COST PW Director/CE Advisor 26 Weeks x 10 Hrs Per Wk $165 $42,900

PLAN REVIEW SERVICES

CLASSIFICATION TIME REQUIREMENT HOURLY BILLING RATE ESTIMATED COST RCE Review 26 Weeks x 4 Hrs Per Wk $165 $17,160
Plan Check 26 Weeks x 10 Hrs Per Wk $85 $22,100

TRAFFIC ENGINEERING SERVICES

CLASSIFICATION TIME REQUIREMENT HOURLY BILLING RATE ESTIMATED COST Traffic Engineer 20 Weeks x 10 Hrs Per WK $175 $35,000
Associate Traffic Engineer 24 Weeks x 10 Hrs Per Wk $125 $30,000 We appreciate the opportunity to continue serving the City of Compton. Should you have any questions, please do not hesitate to contact me, Elizabeth O’Neil at [email protected] / 310.500.5830, or Jim Ross at [email protected] / 714.742.1551.

Sincerely,
Paul Meschino
Vice President of Operations
[email protected]
1 Jenner, Suite 160, Irvine, CA 92618 - 714.899.9039
Billing Rates
The rates displayed in the fee schedule below reflect Interwest’s current fees.

Hourly rates are typically reviewed yearly on July 1 and may be subject to revision unless under specific contract obligations.

CLASSIFICATION HOURLY BILLING RATE
Engineering
Principal in Charge ....................................................................................................................................230 Principal Engineer .....................................................................................................................................205 Project Manager.........................................................................................................................................185 Traffic Engineer..........................................................................................................................................175 Supervising Engineer.................................................................................................................................175 Senior Engineer .........................................................................................................................................165 Licensed Land Surveyor............................................................................................................................175 Engineering Associate III ...........................................................................................................................135 Engineering Associate II ............................................................................................................................125 Engineering Associate I .............................................................................................................................115 Senior Engineering Technician .................................................................................................................115 Engineering Technician III.........................................................................................................................105 Engineering Technician II............................................................................................................................95 Engineering Technician I.............................................................................................................................85 Student Trainee...........................................................................................................................................40 Grading Plans Examiner............................................................................................................................150 Construction Management
Construction Manager ..............................................................................................................................165 Assistant Construction Manager ..............................................................................................................145 Supervising Public Works Observer..........................................................................................................160 Senior Public Works Observer...................................................................................................................150 Public Works Observer III ..........................................................................................................................140 Public Works Observer II ...........................................................................................................................130 Public Works Observer I ............................................................................................................................115

THIRD AMENDMENT
TO

PROFESSIONAL SERVICES AGREEMENT

BETWEEN

CITY OF COMPTON
AND

INTERWEST CONSULTING GROUP
This THIRD AMENDMENT to the Professional Services Agreement is made by and between the CITY OF COMPTON, a municipal corporation of the State of California (hereinafter referred to as “CITY”) and INTERWEST CONSULTING GROUP (hereinafter referred to as “CONSULTANT”).

RECITALS:

WHEREAS, due to the voluminous nature of the projects and assignments that the Public Works (Engineering) Department (“Department”) is responsible for handling, the City has a need to employ the services of an experienced and professional engineering consulting firm to assist the Department by providing certain civil and traffic engineering services; and WHEREAS, on July 21, 2020, pursuant to Resolution No. 25,321, City Council authorized the City Manager to enter into a professional services agreement with Consultant (“Interwest Consulting Group”) to assist the Department by providing on-call and traffic engineering services; and WHEREAS, on April 13, 2021, pursuant to Resolution No. 25,445, City Council authorized the City Manager to enter into a First Amendment to the professional services agreement with Consultant (“Interwest Consulting Group”) to assist the Department by providing on-call and traffic engineering services; and
WHEREAS, on November 2, 2021, pursuant to Resolution No. 25,572, City Council authorized the City Manager to enter into a Second Amendment to the professional services agreement with Consultant (“Interwest Consulting Group”) to assist the Department by providing on-call and traffic engineering services; and
WHEREAS, said on-call and engineering assistance service were authorized to be performed until the agreed compensation amount of $269,292.50 has been exhausted, at which time the agreement would terminate; fund have been exhausted with Interwest; however, the Department’s need for assistance still exist due to staffing shortages and lack of adequate in-house expertise, thus the parties desire to amend the original Agreement to extend the term of the Agreement, continue and expand the scope of services and provide additional compensation in the amount of $343,520 for the additional services rendered during the extended Agreement term’ and
WHEREAS, by Resolution No. ___________, adopted on the ___ day of _________, 2022, the City Council authorized the City Manager to enter into a Third (3rd) amendment to the professional services agreement with Consultant; and
NOW, THEREFORE, Consultant and City, for the consideration, terms and conditions herein described, do hereby mutually agree to amend the original Agreement as follows:

AMENDMENTS:

1. The parties agree to amend Section 1 – Services to be rendered by Consultant of the original Agreement to authorize the continued performance of the services specified within the original Agreement and expand the scope of services to include performance of the following services:
 Artesia Boulevard Bridge Closure Project mitigation for Compton  Rosecrans Bridge Mitigation (financial assistance)
First Amendment to Professional Services Agreement – Interwest Consulting Group On-Call Civil and Traffic Engineering Services
Public Works/Resolution No. _______
2  Street Renaming Projects
 Coordinating of the United States Army Core of Engineers (USACE) regarding the fence below the Artesia bridge for repair and clean-up of the area adjacent to Compton Creek  Annual Residential Street Rehabilitation Phase 2 (Design & Construction)  Compton Boulevard Corridor (Willowbrook Avenue to Central Avenue) HSIP Cycle 8 grant  Compton Boulevard Corridor (Willowbrook Avenue to East City Limits) HSIP Cycle 7 grant  20 Pedestrian Heads – Request For Proposal, Construction Implementation  Compton Boulevard over Compton Creek Projects
 Four Fire Stations Driveway Apron Improvement Projects (CM & Inspection)  Multi-Grade Crossing at 408 & 412 Alondra (Horse crosswalk) Project  SR-91/Central Metro Project Development for Compton with Gateway Cities/Metro  Release of Bonds for Development Projects
 Los Angeles Permit Group
 Private Development Projects including:
a. 1300 Atlantic Avenue – Ryder Truck Sales
b. 1650 West 134th Street Vacation Case No. 20-001
c. 2320 North Parmelee Avenue Grading and Civil Plans
d. Gas Company 27” L765 Project on Atlantic Avenue and Linsey Street e. 927 Santa Fe Avenue Grading/Drainage Plan
f. 501/601 Compton Boulevard
g. 439 Carlin Avenue
h. 2600 Wilmington Avenue
i. 809 Pine Street –PC3
j. 15200 Gibson Avenue
k. 308 East Compton Boulevard
l. 1950 North Central Avenue
m. 701 North Wilmington Avenue – School Site
 Intelligent Transportation System (ITS) coordination with Metro (signal projects)  Industrial Waste Permits
 Atlantic Corridor Master Plan
 I-710 TAC coordination for Early Action Funding of future projects in Compton  Integrated Corridor Management (ICM) Project for Compton  Traffic Engineering including assisting with City policy and implementation of speed bumps, stop signs, permit studies, street renaming, etc.

2. The parties agree to amend Section 2 – Duration of Contract of the original Agreement to extend the term of the Agreement to provide that the Agreement shall terminate on exhaustion of the authorized maximum compensation of Three Hundred Forty Three Thousand Five Hundred Twenty ($343,520), unless otherwise extended or terminated.

3. The parties agree to amend Section 3 – Compensation of the original Agreement to provide additional compensation to Consultant for services rendered during the extended term of the original Agreement, as specified above, in the not-to-exceed amount of Three Hundred Forty Three Thousand Five Hundred Twenty ($343,520).

4. Except as provided for above, all other terms and conditions of the original Agreement and any amendments thereto between the City and the Contractor all remain in effect.

IN WITNESS WHEREOF, the authorized representatives of the parties have executed this THIRD AMENDMENT to the above-identified PROFESSIONAL SERVICES AGREEMENT.

First Amendment to Professional Services Agreement – Interwest Consulting Group On-Call Civil and Traffic Engineering Services
Public Works/Resolution No. _______
3 INTERWEST CONSULTING GROUP/CONSULTANT
Dated: _______________ By ___________________________________________ Paul Meshchino, Vice-President of Operations
Approved by:

Dated: _______________ By ___________________________________________ Ronerick D. Simpson, City Manager
Approved as to form:

By _________________________________ Dated: ______________ Eric J. Perrodin, City Attorney
ATTEST:

Dated: ___________________ By _____________________________________ Alita Godwin, City Clerk
MARCH 1, 2022
TO: MAYOR AND CITY COUNCIL
FROM: CITY MANAGER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

COMPTON AUTHORIZING THE CITY MANAGER TO AMEND

THE PROFESSIONAL SERVICES AGREEMENT WITH AND

ESTABLISH A PURCHASE ORDER FOR JMD TO PROVIDE

ADDITIONAL STREET DESIGN SERVICES FOR THE COMPTON
BOULEVARD STREET IMPROVEMENT PROJECT, CIP# 18-03
($932,644.98)

SUMMARY
Adoption of this resolution will authorize the City Manager to amend the professional services agreement with and establish a purchase order for JMD to provide additional street design services for the Compton Boulevard Street Improvement Project, CIP# 18-03 and authorize the establishment of a purchase order in the amount of $932,644.98.

BACKGROUND
The City of Compton maintains approximately 173 centerline miles of pavement within the City limits. In July 2015, the City secured a Highway Safety Improvement Program (HSIP) Cycle 7 grant in the amount of $1,691,098 to reconstruct Compton Boulevard within City boundaries. This grant will focus on the installation of raised medians and Class II bicycle lanes along Compton Boulevard from Willowbrook Avenue to the eastern City limits.

In August 2016, the City was awarded the HSIP Cycle 8 grant in the amount of $1,168,200. This grant will address systemic issues along the Compton Boulevard Corridor by installing bike lanes and lighting along Compton Boulevard from Willowbrook Avenue to Central Avenue as well as enhancing pedestrian crossings at 15 intersections.

The HSIP is a core Federal-aid program with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads. Overall, the Compton Boulevard Street Improvement Project proposed improvements will focus primarily on improving safety through roadway paving which is in poor condition as well as improving raised medians islands, adding Class II bicycle lanes, enhancing pedestrian crossings, improving parkways, sidewalks and curb ramps which do not meet ADA standards.

7. Staff Report – Resolution Amending Agreement with JMD/Street Design Services Compton Blvd. Street Improvement Project (CIP #18-03)
March 1, 2022

Page 2 of 6 ends

On March 28, 2018, the City solicited proposals from qualified consulting firms to provide pavement resurfacing design services on Compton Boulevard from City limit east to City limit west and on April 26, 2018, the City received four proposals from qualified engineering firms and the proposal submitted by JMD was the most qualified consultant for the Compton Boulevard Street Improvement Project.

On September 18, 2018, pursuant to Resolution No. 24,862, City Council authorized the City Manager to enter into a professional services agreement with JMD to provide design services for the Compton Boulevard Street Improvement Project in the amount of $535,167.02.

JMD has extensive experience developing Plans, Specifications, & Estimates designs for local arterials in the City of Compton and throughout Southern California. Such projects include roadway rehabilitation, safety enhancements, beautification and widening projects requiring roadway improvement, grading crossing, traffic signal installation/modification, traffic signal interconnection, street lighting, signing and striping, and worksite traffic control plans.

The consultant was responsible for providing professional design and engineering services for the preparation of preliminary design and the final plans, specifications and estimates, bid package including design support services during construction pursuant to the HSIP project which includes 1). Upgrading/adding segment lighting with LED, 2). Providing higher visibility crosswalks, 3). Adding Class II Bikeway with outer land paving only, and 4). Adding raised median islands.

Services to be rendered included, but were not limited to the task and deliverables below:

Phase 0 Project Initiation and Management
Task I-1 Project Administration, coordination and meetings, project related correspondence, meeting agendas,
meeting minutes, schedule, progress reports and
invoices
Phase I Preliminary Design (30%) – Plans, Specifications, & Estimates Task I-2 Research/Data Collection/Utility Coordination
Task I-3 Geotechnical Analysis/Report
Task I-4 Surveying/ROW Engineering/Base Plans
Task I-5 Pavement Engineering/Traffic Index Calculations Task I-6 Landscape Concept
Task I-7 Community Outreach
Task I-8 Right of Entry (ROE) Permit Application
Task I-9 Diagnostic Meetings
Staff Report – Resolution Amending Agreement with JMD/Street Design Services Compton Blvd. Street Improvement Project (CIP #18-03)
March 1, 2022

Page 3 of 6 ends

Phase 2 60% Design
Task II-1 Preliminary Plans
Task II-2 Notice of Intent and SWPPP Construction Booklet Task II-3 Construction Bit items and Opinion of Probable Construction Cost
Task II-4 Specifications
Task II-5 Easement/License Coordination (Optional)
Task II-6 Construction and Maintenance (C&M) Agreement
Task II-7 CPUC Application
Phase 3 90% Design
Task III-1 Address/Incorporate Comments and Prepare 90% Submittal
Phase 4 Final (100%) Design
Task IV Address/Incorporate Comments and Prepare Final
Submittal
Phase 5 Post Design
Task V-1 Bidding and Preconstruction Assistance
Task V-2 Design Support During Construction
Task V-3 As-Built Plans

STATEMENT OF ISSUE
On December 6, 2018, JMD was authorized to proceed with the design services for the Compton Boulevard Street Improvement Design project. The proposed schedule for design services was projected to be approximately 13 months.

After a comprehensive review, City staff determined the additional improvements were necessary to include the improvement of substandard curb ramps (114), a drainage analysis to include the construction of storm drains, catch basins, and replacing discolored curb ramps (23) and intersection pavement (3) along Compton Boulevard.

The Current HSIP Safety Enhancement Project Compared to the Full Rehabilitation of Compton Boulevard being proposed is as follows:

Staff Report – Resolution Amending Agreement with JMD/Street Design Services Compton Blvd. Street Improvement Project (CIP #18-03)
March 1, 2022

Page 4 of 6 ends

Current Scope of Work Compared to Proposed Added Scope of Work Current HSIP Safety Enhancements Full Rehabilitation of Compton

1. Upgrading/Adding Segment Lighting with
LED

1. Providing Standard Storm Drain
Facilities due to Flat Grades

2. Provide Higher Visibility Crosswalks 2. Upgrading/Adding ADA Compliant (114 Curb Ramp)
Facilities

3. Adding Class II Bikeway with Outer Lane
Paving Only

3. Providing Full Width Roadway
Paving

4. Adding Raised Median Island 4. Removing Colored Concrete at Ramps/Intersections
JMD proposes that the additional designs services will cost an additional $932,644.98. An analysis of the original proposal and the additional work is as follows:

Compton Boulevard Design Services Analysis
Task Description Original Cost Amendment
Costs
Phase 0 - Project Initiation and Management
I-1 Project Administration,
Coordination and Meetings
(maximum of 6 meetings)
$14,068.09 $14,270.33
Phase I - Preliminary Design
I-2 Research/Data Collection/Utility
Coordination
$10,330.74 $12,068.93
I-3 Geotechnical Analysis/Report $41,139.00 $15,425.98
I-4 Surveying $92,474.31 $25,805.98
I-5 Pavement Engineering/Traffic
Index Calculations
$ 5,772.16 0
I-6 Hydrology/Hydraulics
Analysis/Report
$ 5,189.00 $60,715.17
I-7 Community Meetings $ 7,024.44 0
I-8 Railroad Right of Entry Permit
Application
$12,319.57 0
I-9 Diagnostic Meetings $ 2,439.62 0
Phase II – 60% Design
II-1a Title Sheet $ 3,116.65 $ 3,060.20
II-1b Typical Sections and Detail Plans $ 6,233.30
II-1c Roadway Improvement Plans $66,169.15 $68,711.96
II-1d Grade Crossing Plan $ 5,080.41
II-1e Intersection Plans $26,581.12 $14,448.76
Staff Report – Resolution Amending Agreement with JMD/Street Design Services Compton Blvd. Street Improvement Project (CIP #18-03)
March 1, 2022

Page 5 of 6 ends

Task Description Original Cost Amendment
Costs
II-1f Curb Ramp (114, 49 Color and 49
Tactile Improvements)
$32,182.70 $169,417.91
II-1g Storm Drain Plans and Details $22,533.91 $64.843.05 II-1h Street Lighting Plans $24,329.00 0
II-1i Traffic Staging Plans $24,329.00 0
II-1j Landscaping and Irrigation Plans $15,359.00 0
II-1k Hardscape Plans $15,359.00 0
II-2 Notice of Intent and SWPPP
Construction Booklet
$ 7,219.82 0
II-3 Construction Bid Items and Opinion
of Probable Construction Cost
$ 3,988.96 0
II-4 Specifications $ 3,663.87 0
II-5 Easement/License Coordination $ 1,384.01 0
II-6 Construction & Maintenance
Agreement
$ 1,051.01 0
II-7 CPUC Application $ 1,734.05 0
II-1l Traffic Control Plans- Storm Drain n/a $71,423.25 II-1m Landscaping and Irrigation Plans n/a $42,000.00
II-1n Hardscape Plans n/a $42,000.00
II-3 Construction Bid Items and Opinion
of Probable Construction Cost
n/a $ 3,647.15
II-4 Specifications n/a $ 4,268.95
Phase III – 90% Design
III-1 Address/Incorporate Comments
and Prepare 90% Submittal
$45,707.86 $195,975.27
Phase IV – Final Design
IV-1 Address/Incorporate Comments
and Prepare Final Submittal
$22,196.33 $65,389.91
Phase V – Post Design
V-1 Bidding and Preconstruction
Assistance
$ 5,057.98
V-2 Design Support During
Construction
$ 7,429.35 $ 8,693.33
V-3 As-Built Plans $ 3,703.62 $ 4,292.60
Escalation
(3 Years)
n/a $46,186.26
Total Estimated Design Cost $ 535,167.03 $932,644.98
Total Combined Design Cost $1,467,812.01
Staff Report – Resolution Amending Agreement with JMD/Street Design Services Compton Blvd. Street Improvement Project (CIP #18-03)
March 1, 2022

Page 6 of 6 ends

The additional engineering services are needed to enhance the current project and cover essential rehabilitation designed to correct existing substandard conditions and meeting standard capacity. The additional services will provide Compton Boulevard with the following improvement ultimately yielding a pavement life of 20 years.

It is estimated that the total construction cost will be approximately $16,456,908.94 and the estimated new design costs will be approximately $1,467,812 which exceeds JMD’s current contract by $932,644.98.

Therefore, in order to amend the professional services agreement with JMD to provide additional engineering design services in the amount of $932,644.98, City Council’s authorization is necessary.

ALTERNATIVE
There are no other alternatives being recommended at this time. The City’s pavement condition is in dire need of immediate rehabilitation. The pavement design services will address these needs and develop the necessary construction documents to begin the roadway pavement rehabilitation required on Compton Boulevard pursuant to the HSIP Cycle 7 & 8 Grants.

FISCAL IMPACT
Funds in the amount of $932,644.98 are available in the Public Works 2021-2022 fiscal year budget in Account No. 1900-710-000-4262 ($600,000) and Account No. 3031-710-000-4300 ($332,644.98).

RECOMMENDATION
Staff recommends the City Council adopt the attached Resolution.

JOHN STRICKLAND, PROJECT MANAGER

PUBLIC WORKS ENGINEERING DEPARTMENT
APPROVED FOR FORWARDING:

RONERICK D. SIMPSON

CITY MANAGER
RESOLUTION NO. ____________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO AMEND THE PROFESSIONAL

SERVICES AGREEMENT WITH AND ESTABLISH A PURCHASE ORDER

FOR JMD TO PROVIDE ADDITIONAL STREET DESIGN SERVICES FOR THE COMPTON BOULEVARD STREET IMPROVEMENT PROJECT, CIP# 18-03 ($932,644.98)
WHEREAS, adoption of this resolution will authorize the City Manager to amend the professional services agreement with and establish a purchase order for JMD to provide additional street design services for the Compton Boulevard Street Improvement Project, (CIP# 18-03) and authorize the establishment of a purchase order in the amount of $932,644.98; and
WHEREAS, the City of Compton maintains approximately 173 centerline miles of pavement within the City limits; and
WHEREAS, in July 2015, the City secured a Highway Safety Improvement Program (HSIP) Cycle 7 grant in the amount of $1,691,098 to reconstruct Compton Boulevard within City boundaries and this grant will focus on the installation of raised medians and Class II bicycle lanes along Compton Boulevard from Willowbrook Avenue to the eastern City limits; and
WHEREAS, in August 2016, the City was awarded the HSIP Cycle 8 grant in the amount of $1,168,200 and this grant will address systemic issues along the Compton Boulevard Corridor by installing bike lanes and lighting along Compton Boulevard from Willowbrook Avenue to Central Avenue as well as enhancing pedestrian crossings at 15 intersections; and
WHEREAS, the HSIP is a core Federal-aid program with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads and overall, the Compton Boulevard Street Improvement Project proposed improvements will focus primarily on improving safety through roadway paving which is in poor condition as well as improving raised medians islands, adding Class II bicycle lanes, enhancing pedestrian crossings, as well as improving some parkways, sidewalks and curb ramps which do not meet ADA standards; and
WHEREAS, on March 28, 2018, the City solicited proposals from qualified consulting firms to provide pavement resurfacing design services on Compton Boulevard from City limit east to City limit west and on April 26, 2018, the City received four proposals from qualified engineering firms and the proposal submitted by JMD was the most qualified consultant for the Compton Boulevard Street Improvement Project; and WHEREAS, on September 18, 2018, pursuant to Resolution No. 24,862, City Council authorized the City Manager to enter into a professional services agreement with JMD to provide design services for the Compton Boulevard Street Improvement Project in the amount of $535,167.02; and
WHEREAS, JMD has extensive experience developing Plans, Specifications, & Estimates designs for local arterials in the City of Compton and throughout Southern California and such projects include roadway rehabilitation, safety enhancements, beautification and widening projects requiring roadway improvement, grading crossing, traffic signal installation/modification, traffic signal interconnection, street lighting, signing and striping, and worksite traffic control plans; and
WHEREAS, the consultant performed and was responsible for providing professional design and engineering services for the preparation of preliminary design and the final plans, specifications and estimates, bid package including design support services during construction pursuant to the HSIP project which includes 1).

Upgrading/adding segment lighting with LED, 2). Providing higher visibility crosswalks, Resolution____________

Page 2 ends

3). Adding Class II Bikeway with outer land paving only, and 4). Adding raised median islands; and
WHEREAS, services to be rendered included, but were not limited to the task and deliverables below:
 Phase 0 Project Initiation and Management
 Phase 1 Preliminary Design (30%) – Plans, Specifications, & Estimates
 Phase 2 60% Design
 Phase 3 90% Design
 Phase 4 Final (100%) Design
 Phase 5 Post Design
WHEREAS, on December 6, 2018, JMD was authorized to proceed with the design services for the Compton Boulevard Street Improvement design project and the proposed schedule for design services was projected to be approximately 13 months; and
WHEREAS, after a comprehensive review, City staff determined the additional improvements were necessary to include the improvement of substandard curb ramps (114), a drainage analysis to include the construction of storm drains and catch basins, replacing the discolored curb ramps (23) and intersection pavement (3) along Compton Boulevard; and
WHEREAS, the Current HSIP Safety Enhancement Project Compared to the Full Rehabilitation of Compton Boulevard being proposed is as follows:

Current Scope of Work Compared to Proposed Added Scope of Work Current HSIP Safety Enhancements Full Rehabilitation of Compton

1. Upgrading/Adding Segment Lighting with
LED

1. Providing Standard Storm Drain
Facilities due to Flat Grades

2. Provide Higher Visibility Crosswalks 2. Upgrading/Adding ADA Compliant (114 Curb Ramp)
Facilities

3. Adding Class II Bikeway with Outer Lane
Paving Only

3. Providing Full Width Roadway
Paving

4. Adding Raised Median Island 4. Removing Colored Concrete at Ramps/Intersections; and
WHEREAS, JMD proposes that the additional designs services will cost an additional $904,287.21 and an analysis of the original proposal and the additional work is as follows:

Resolution____________

Page 3 ends

Compton Boulevard Design Services Analysis
Task Description Original Cost Amendment
Costs
Phase 0 - Project Initiation and Management
I-1 Project Administration, Coordination
and Meetings (maximum of 6
meetings)
$14,068.09 $14,270.33
Phase I - Preliminary Design
I-2 Research/Data Collection/Utility
Coordination
$10,330.74 $12,068.93
I-3 Geotechnical Analysis/Report $41,139.00 $15,425.98
I-4 Surveying $92,474.31 $25,805.98
I-5 Pavement Engineering/Traffic Index
Calculations
$ 5,772.16 0
I-6 Hydrology/Hydraulics Analysis/Report $ 5,189.00 $60,715.17 I-7 Community Meetings $ 7,024.44 0
I-8 Railroad Right of Entry Permit
Application
$12,319.57 0
I-9 Diagnostic Meetings $ 2,439.62 0
Phase II – 60% Design
II-1a Title Sheet $ 3,116.65 $ 3,060.20
II-1b Typical Sections and Detail Plans $ 6,233.30
II-1c Roadway Improvement Plans $66,169.15 $68,711.96
II-1d Grade Crossing Plan $ 5,080.41
II-1e Intersection Plans $26,581.12 $14,448.76
II-1f Curb Ramp (114, 49 Color and 49
Tactile Improvements)
$32,182.70 $169,417.91
II-1g Storm Drain Plans and Details $22,533.91 $64.843.05 II-1h Street Lighting Plans $24,329.00 0
II-1i Traffic Staging Plans $24,329.00 0
II-1j Landscaping and Irrigation Plans $15,359.00 0
II-1k Hardscape Plans $15,359.00 0
II-2 Notice of Intent and SWPPP
Construction Booklet
$ 7,219.82 0
II-3 Construction Bid Items and Opinion of
Probable Construction Cost
$ 3,988.96 0
II-4 Specifications $ 3,663.87 0
II-5 Easement/License Coordination $ 1,384.01 0
II-6 Construction & Maintenance
Agreement
$ 1,051.01 0
II-7 CPUC Application $ 1,734.05 0
II-1l Traffic Control Plans- Storm Drain n/a $71,423.25 II-1m Landscaping and Irrigation Plans n/a $42,000.00
II-1n Hardscape Plans n/a $42,000.00
II-3 Construction Bid Items and Opinion of
Probable Construction Cost
n/a $ 3,647.15
II-4 Specifications n/a $ 4,268.95
Phase III – 90% Design
III-1 Address/Incorporate Comments and
Prepare 90% Submittal
$45,707.86 $195,975.27
Phase IV – Final Design
IV-1 Address/Incorporate Comments and
Prepare Final Submittal
$22,196.33 $65,389.91
Phase V – Post Design
V-1 Bidding and Preconstruction
Assistance
$ 5,057.98
V-2 Design Support During Construction $ 7,429.35 $ 8,693.33 V-3 As-Built Plans $ 3,703.62 $ 4,292.60
Escalation
(3 Years)
n/a $46,186.26
Total Estimated Design Cost $ 535,167.03 $932,644.98
Total Combined Design Cost $1,467,812.01
Resolution____________

Page 4 ends

and;
WHEREAS, the additional engineering services are needed to enhance the current project and cover essential rehabilitation designed to correct existing substandard conditions and meeting standard capacity. The additional services will provide Compton Boulevard with the following improvement ultimately yielding a pavement life of 20 years; and
WHEREAS, it is estimated that the total construction cost will be approximately $16,456,908.94 and the new estimated design cost will be approximately $1,467,812 which exceeds JMD’s current contract by $932,644.98; and WHEREAS, funds in the amount of $932,644.98 are available in the Public Works 2021-2022 fiscal year budget in Account No. 1900-710-000-4262 ($600,000) and Account No. 3031-710-000-4300 ($332,644.98); and
WHEREAS, in order to amend the professional services agreement with JMD to provide additional engineering design services, City Council’s authorization is necessary.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the City Manager, upon the advice and approval of the City Attorney is hereby authorized to amend the professional services agreement with JMD to provide additional street design services for the Compton Boulevard Street Improvement Project (CIP#18-03) in the amount not to exceed $932,644.98.

SECTION 2. That funds in the amount of $932,644.98 are available in the Public Works 2021-2022 fiscal year budget in Account No. 1900-710-000-4262 ($600,000) and Account No. 3031-710-000-4300 ($332,644.98).

SECTION 3. That a purchase order in the amount of Nine Hundred Four Thousand Two Hundred Eighty Seven Dollars and Twenty One Cents ($932,644.98) shall be established for JMD for services to be rendered.

SECTION 4. That copies of this Resolution shall be filed in the offices of the City Manager, City Controller, City Clerk, City Attorney and the Public Works Department.

SECTION 5. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this _______ day of _______________, 2022.
________________________________

MAYOR OF THE CITY OF COMPTON
Resolution No. _______

Page 5 ends

ATTEST:
____________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
CITY OF COMPTON: ss
I, Alita Godwin, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council of the City of Compton, signed by the Mayor and attested by the City Clerk, at a regular meeting thereof held on the _______ day of ___________________, 2022.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCIL MEMBERSNOES: COUNCIL MEMBERSABSTAIN: COUNCIL MEMBERSABSENT: COUNCIL MEMBERS- ____________________________________

CITY CLERK OF THE CITY OF COMPTON
18645 East Gale Avenue, Suite 212, City of Industry, CA 91748 (626) 820-1137 Tel ● (626) 820-1136 Fax
www.jmdiaz.com
December 20, 2021
Mr. John Strickland Jr.

Project Manager
City Clerk’s Office
City of Compton
205 South Willowbrook Avenue
Compton, CA 90220 2021.1112.0077.00
SUBJECT: Proposal to Provide Additional Street Design Services for Compton Boulevard, CIP #18-01 From City Limit East to City Limit West in the City of Compton

Dear Mr. Strickland:

JMD is pleased to submit this proposal to provide additional professional engineering design services for the proposed Compton Boulevard Street Design Services in the City of Compton. Our proposal, which remains in effect for a period of 90 days, has been prepared in accordance with the City’s Request for Proposal, issued April 11, 2018 and outlines our qualifications, approach and scope of services for the subject project.

JMD is a full-service engineering firm, with extensive City of Compton experience, which specializes in providing multimodal roadway, streetscape, traffic, lighting, railroad, rail transit and highway engineering services to cities and agencies with major arterials, truckways, freeways and railroad facilities including:
 City of Compton
 City of Commerce
 City of Industry
 City of Irwindale
 City of Los Angeles
 City of Pico Rivera
 City of Santa Fe Springs
 City of Vernon
 County of Los Angeles
 Port of Los Angeles
 Port of Long Beach
 Caltrans
Experience on Similar Projects - JMD has prepared preliminary and final design as well as provided construction oversight of a variety of highway, truckway and transportation projects. In Compton, JMD has provided citywide street improvements projects (e.g., Compton’s Citywide Street Projects), corridor vision projects (e.g., Central Avenue), regional highway projects (e.g., SR-91 Freeway Improvement Projects) and railroad/rail/transit projects (e.g., Long Beach Blue Line). Overall, JMD has designed nearly 40 miles of local streets in the central Los Angeles Basin and specifically within the Gateway Cities as outlined below:
 Central Avenue, Phase II, Street Improvements (1.2 mile), City of Compton  Central Avenue, Phase I, Street Improvements (1 mile), City of Compton  Citywide Street Maintenance Program (7 miles), City of Compton  CDBG Various Street Improvements (2 miles), City of Compton  Atlantic Avenue (1 mile), Los Angeles County and City of Compton  Telegraph Road Rehabilitation (3.2 miles), City of Commerce  Marine Avenue Roadway Improvements (1 mile), County of Los Angeles  Prairie Avenue Roadway Improvements (1 mile), County of Los Angeles  Mealy Street Freight Rail Connector (0.5 mile), City of Compton/LACMTA  Santa Ana Street Streetscape (0.5 mile), City of Anaheim Redevelopment Agency  Market Street Streetscape Project (0.3 miles), City of Inglewood  Rosecrans Avenue Overpass, City of Compton/LACMTA
 Long Beach Blue Line Light Rail Transit Project – Compton Bl. and Willowbrook Ave. (3 miles), LACMTA  Pedestrian Gate Installation – Design Review and Inspection, LA Metro/City of Compton Mr. John Strickland Jr.

December 20, 2021

Page 2 ends

Project Understanding, Approach and Scope of Work to Develop Project Efficiently – Our Project Team uniquely understands the current Compton Boulevard Safety Enhancement Project, funded with Highway Safety Improvement Program (HSIP) funds, and the need to reconstruct Compton Boulevard and convert it into the main thoroughfare that it is and should be in standard adherence and capacity. As such, additional engineering services are needed to enhance the current project and cover essential rehabilitation designed to correct existing substandard conditions and meeting standard capacity. The additional services will provide Compton Boulevard with the following improvements ultimately yielding a pavement life of 20 years.

Current HSIP Safety Enhancement Project Full Rehabilitation of Compton Boulevard

1. Upgrading/Adding Segment Lighting with LED 1. Providing Standard Storm Drain Facilities due to Flat Grades

2. Providing Higher Visibility Crosswalks 2. Upgrading/Adding ADA Compliant (114 Curb Ramp) Facilities

3. Adding Class II Bikeway with Outer Lane Paving Only 3. Providing Full Width Roadway Paving

4. Adding Raised Medians Islands 4. Removing Colored Concrete at Ramps/Intersections We have assembled a comprehensive project team with extensive streetscape, roadway, traffic and grade crossing engineering knowledge, experience and expertise to assist the City of Compton in achieving the goals of this project in a timely manner. The JMD Team offers unique understanding of project issues, a cost-effective project approach and comprehensive scope of work to develop the project with minimal project impacts to local residents, businesses and commuters as well as provide optimum effectiveness.

We have assigned one of our most qualified Project Managers, Juan M. Diaz, MBA, PE, who has over 35 years of highway, roadway, traffic, transit and rail engineering experience in the transportation planning and engineering industry. Mr. Diaz has unique and extensive local knowledge and City of Compton experience. He has designed and managed miles of roadways and highways as well as hundreds of grade crossings and grade separations for various local agencies and railroads including the Cities of Compton, Commerce, County of Los Angeles, Union Pacific Railroad Company (UPRR), Metro and Caltrans facilities. Mr. Diaz’s knowledge and expertise also includes arterials, freeway mainlines, HOV lanes, interchanges and truckways as well as projects involving State routes, local streets, rail/bus transit corridors and railroads. In addition, Mr. Diaz’ diverse experience provides unique insight on multidiscipline projects involving multiple stakeholders and funding insight for projects in the region. Furthermore, Mr. Diaz is known for his ability to manage highly sensitive regional projects involving multiple stakeholders (i.e. commercial, industrial and residential parties) and multilingual outreach capabilities.

Complementing the JMD Team are expert firms with local Compton experience including MIG, Inc., Geo-Advantec, Inc. and FHA Consulting Engineers to provide needed Landscape Architecture, Geotechnical, and Surveying expertise, respectively.

Experience in Federally Funded Project Requirements and Process - Our Project Team has been involved on numerous projects involving Federally funded project requirements and processes. These projects include major roadways, parking lots, rail stations and other public works facilities. The following are among the most recent projects involving Federally funded requirements and procedures including PS&E packaging:
 Metrolink Station and Pedestrian Improvements, City of Covina  Oxnard Transportation Center, City of Oxnard
 East Fourth Street Parking Lot, City of Oxnard
Mr. John Strickland Jr.

December 20, 2021

Page 3 ends

Our proposal has been organized to meet the requirements required by the City and includes the following sections:

Section 1 Introduction
Section 2 Project Experience
Section 3 Key Personnel
Section 4 Understanding, Approach and Scope
Section 5 Cost Proposal
We are excited about the possibility of serving the City of Compton on this project and firmly believe we have numerous benefits to offer including:
 A Proven Team with extensive Streetscape/Roadway/Crossing experience.  A Project Manager and Team with local knowledge and City of Compton experience.  An Experienced Project Manager with miles of roadway analysis and design experience.  A responsive, innovative and cost-effective project approach and a reputation for quality.

We appreciate the opportunity to submit our proposal and qualifications for your consideration on this important project and look forward to your favorable reply.

Should you have any questions regarding this proposal, please contact me at (626) 820-1137.

Sincerely,
JMDiaz, Inc.

Juan M. Diaz, MBA, PE
President/CEO
Enclosures
City of Compton
Additional Street Design Services for Compton Boulevard I-1

1. INTRODUCTION
JMDiaz, Inc. (JMD), a California corporation, offers a
full range of transportation planning and civil
engineering covering highways, roadways, land
development, traffic and rail projects for local agencies, schools, railroads and private entities in California.

Originally founded and 100% owned by Juan M. Diaz
in 2001, JMD serves clients from its offices in the City of Industry, Anaheim and San Diego, California.

Currently, JMD has a staff of 26 professionals and
administrative staff.

Through the proven experience of its professionals and
technical staff, JMD has earned a reputation of quality, commitment and responsiveness by providing
innovative and timely design solutions on projects
sponsored by private developers and public agencies.

JMD’s reputation is complemented by its values and
commitment to improve quality of life as expressed in
its mission statement:
“To provide responsive, innovative and effective
solutions that improve quality of life.”
In addition to its comprehensive qualifications, JMD is also certified with local agencies as a:
• Disadvantaged Business Enterprise (DBE)
• Minority Business Enterprise (MBE)
• Small Business Enterprise (SBE)
• Community Business Enterprise (CBE)
Services
JMD offers a wide range of services covering planning,
engineering and management for public and private
sector clients. These services, outlined to the right,
cover all phases of project development from
conceptual design through construction. Such depth of
services is one of JMD’s unique and distinguishing
characteristics that have contributed to its success.

Location
JMD is located at the address shown below.

City of Industry
18645 East Gale Avenue, Suite 212
City of Industry, CA 91748
Phone (626) 820-1137 ● Fax (626) 820-1136
Planning
• Highways
Project Study Reports/Project Reports/PSREs
PEERs/Fact Sheets
• Civil
Master Plans
Concept Design
Feasibility Studies
• Land Development
Master Plans
Traffic Impact Studies
• Rail
Rail Corridor/Feasibility Studies
Rail Safety Studies/Grade Crossing Analysis
Quiet Zones
• Structures
Grade Separation Feasibility Studies
• Traffic
Traffic Impact Studies
Warrant Analysis
Safe Route to School Studies
Engineering
• Highway/Roadway Design
Mainlines/Ramps/Interchanges
Roadway Rehabilitation/Streetscapes
Bikeways/Trails
• Land Development
Residential/Commercial Sites
Campus Expansions/Master Plans
• Rail Design (Light, Commuter & Freight)
Mainline/Industry/Shoofly Alignment
Grade Crossings/Stations/Quiet Zones
• Structures
Rail/Highway Grade Separations
Pedestrian Bridges
• Traffic/Transit Design
Signing and Striping
Traffic Signals/Lighting/Traffic Control/CCTV
Bus Rapid Transit Corridors/Stations
Management
• Project Management
• Program Management
• Construction Management
City of Compton
Additional Street Design Services for Compton Boulevard I-2
Subconsultants
Role: Landscape Architecture
MIG, Inc., founded in 1982, is a multidisciplinary firm that specializes in urban planning and design, public
outreach, consensus building and facilitation, and
communications. The firm offers a full range of
services, including master planning, site planning,
streetscape design, zoning, conceptual design, transitoriented development planning, and policy planning.

MIG’s work is characterized by a dedication to quality, a flexible approach, creativity in planning and design, and a commitment to completing projects on time and
within budget. The firm has worked extensively with
public agencies and municipalities in California,
nationally and internationally on design and planning
for future change.

The diversity of the MIG staff of 160 provides a base of knowledge that bridges technical expertise and values,
and facilitates the exchange of information among all
parties engaged in the planning process. Staff
backgrounds encompass urban and regional planning,
urban design, strategic planning, public participation, higher education planning, environmental design and
research, landscape architecture, communications,
graphic design, and public policy.

MIG’s unique combination of planning and design
expertise allows them to conduct technical planning in
a highly interactive process involving all constituent
groups. This process generates a clear and collective
vision of development and growth in a dynamic, yet
stable environment. Through MIG’s participatory
planning and design process, client goals and
community interests work together to frame key issues.

Plans created through this approach enjoy broadbased support and are readily implemented.

Role: Geotechnical
Geo-Advantec, Inc. (GAI), provides a full range of
responsive and quality geotechnical engineering,
materials testing, and inspection services for all
phases of projects from conceptual design through
construction. The principals of the company have
worked for more than 30 years each in the industry.

Their philosophy is to provide the highest quality
services to clients. Therefore, they have assembled a
team of highly experienced and specialized engineers
and geologists who have worked on a variety of
projects nationwide and worldwide. They assure the
highest level of practice standards to maintain client
trust through providing accurate analyses and
informed recommendations.

Currently, GAI has a team of more than 25 registered
civil and geotechnical engineers, geologists, field and laboratory technicians, and in-house special soil
inspectors. The team has a wide range of skills on
public and private sector projects including educational and municipal buildings, roadways and transportation
related structures, public infrastructure facilities,
pavement rehabilitation projects, utility lines,
commercial, and industrial facilities and structures
throughout Southern California. During the past three
years, Geo-Advantec has completed more than $3
Million worth of geotechnical engineering and
testing/inspection contracts for different cities,
municipalities, and public projects during the past three years. GAI’s principal engineers and inspectors have
worked effectively on state and federally funded
projects in California in the past two decades.

GAI’s proposed key personnel assigned to City
contracts has worked successfully on numerous new
pavement, pavement rehabilitation, retrofit projects
such as FDR (full depth reclamation), underground
utilities, public parking structures and building, park facilities, and traffic signals projects for cities
throughout Southern California.

Role: Surveying and ROW Engineering (Optional)
FHA Consulting Engineers, is a small and well
established civil engineering firm offering professional land surveying and mapping services throughout
California. FHA applies state-of the-art land surveying techniques and instruments to produce high quality
products that can be relied on for further use by its
public sectors and private clients. FHA was established in January 2003 in Orange County, California and its
main office is located in the City of Irvine.

City of Compton
Additional Street Design Services for Compton Boulevard II-1

2. PROJECT EXPERIENCE
The JMD Team has prepared preliminary and final
design for miles of highways, arterials and truckways
as well as hundreds of rail crossings and grade
separations for local Cities and Counties in Southern
California. In Compton, JMD has performed design for
over 10 miles of local arterials and streets. The JMD
Team’s related project experience is briefly described
below.

On-Call Pavement Design Services, CDBG No. 13-01
City of Compton
JMD is providing pavement design services to the City
of Compton on an on-call basis as part of the City
Community Development Block Grant (CDBG)
program. Project tasks include engineering review,
design and recommended services to achieve
rehabilitation of City identified streets, and the services shall also include the development and preparation of
the necessary construction documents to affect the
proposed street improvements. An engineer’s estimate
was also prepared to assist the City with
implementation of its Capital Improvement Program.

Client: City of Compton
Reference: Mr. Glen W.C. Kau
1315 Valley Drive
Hermosa Beach, CA 90254
(310) 318-0238 Tel.
[email protected]
Duration: 2013 - 2014
Design Fee: $16,000
Construction: $1,610,000 (est.)
Personnel: J.Diaz, S.Itagaki, G.Andrade, A.Abad
Team: JMDiaz, Inc. (Prime)
2014 Street Resurfacing Project, CIP 14-01
City of Compton
JMD provided pavement resurfacing for 65 streets in
the City of Compton. Tasks included installation of
slurry seal, cape seal, ADA access ramps, speed
humps and AC pavement, curb and gutter, driveway,
and sidewalk removal and replacement as well as
signing and striping.

Client: City of Compton
Reference: Mr. Glen W.C. Kau
1315 Valley Drive
Hermosa Beach, CA 90254
(310) 318-0238 Tel.
[email protected]
Duration: June, 2014 - October, 2014
Design Fee: $80,000
Construction: $2,100,000
Personnel: J.Diaz, A.Abad, S.Yazdi
Team: JMDiaz, Inc. (Prime)
Central Avenue Street Corridor Transportation Study
& Conceptual Design Plans, City of Compton
JMD, along with subconsultant MIG, Inc., prepared a
Transportation Study/PSRE to seek local, State and
Federal transportation funds for the improvement of
Central Avenue Corridor between Artesia Boulevard
and El Segundo Boulevard in the City of Compton. This
Transportation Study/PSRE and Conceptual Plans,
considered Phase I of the project, will allow the City to evaluate transportation needs in the key corridor and
provide base conceptual engineering plans for the
redesign of the corridor focusing on a safe,
sustainable, integrated and efficient transportation
system. JMD developed three alternatives which
City of Compton
Additional Street Design Services for Compton Boulevard II-2
consider conventional, complete and green street
elements to best address local access and circulation
needs on Central Avenue. Such mix of alternatives
also increased the likelihood of obtaining project
funding. The ultimate recommendation consisted of a
combination complete and green street concept which
provides a Class IV protected bikeway to address
safety issues related to unsafe crossings including
school crossings.

Client: City of Compton
Reference: Mr. Glen W.C. Kau
1315 Valley Drive
Hermosa Beach, CA 90254
(310) 318-0238 Tel.
[email protected]
Duration: 2014-2015
Design Fee: $260,000
Personnel: J.Diaz, S.Itagaki, A.Abad
Team: JMDiaz, Inc. (Prime)
MIG, Inc. - Landscaping
Central Avenue Rehabilitation, Phases 1 and 2
City of Compton
JMD, along with subconsultant FHA Consulting
Engineers, is currently providing pavement design
services to the City of Compton for the rehabilitation
of Central Avenue between 131st Street and Compton
Boulevard (Phase 1) as well as between Compton
Boulevard and Memorial Park Cemeteries (Phase 2).

Tasks include engineering review, pavement design,
preparation of plans, specifications and estimates as
well as design support during construction.

Client: City of Compton
Reference: Mr. John Strickland, Project Manager
205 South Willowbrook Avenue
Compton, CA 90220
(310) 605-5505 Tel.
[email protected]
Duration: 2015-Present
Personnel: J. Diaz, A. Abad
Team: JMDiaz, Inc. (Prime)
FHA Consulting Engineers - Survey
Telegraph Road Rehabilitation
City of Commerce
JMD is currently preparing preliminary and final design plans for the rehabilitation of Telegraph Road, between Atlantic Boulevard and the Rio Hondo Channel
(approximately 3 miles) in the City of Commerce.

Rehabilitation improvements include street
reconstruction and resurfacing. In addition, the project includes surface improvements at the Los Nietos
Subdivision, a Union Pacific Railroad (UPRR) grade
crossing, towards the east end of the project. JMD is
responsible for developing roadway, "hot spot"
intersection, grade crossing, signing and striping and
traffic control plans for the City but including Caltrans due to the proximity to I-5. Close coordination with
Metro (funding), Caltrans, UPRR and the California
Public Utilities Commission (CPUC) is an important
element of the project.

City of Compton
Additional Street Design Services for Compton Boulevard II-3
Client: City of Commerce
Reference: Mr. Wendell Johnson, PE
205 South Willowbrook Avenue
Compton, CA 90220
(562) 279-6878 Tel.
[email protected]
Duration: 2013 - Ongoing
Design Fee: $109,725
Const. Cost: $1,220,000 (est.)
Personnel: J.Diaz, S. Itagaki, G. Andrade
Team: JMDiaz, Inc. (Prime)
Metro Blue Line Pedestrian Swing Gate Installation
City of Compton
JMD reviewed the design plans for the installation of
pedestrian gates along Metro’s Long Beach Blue Line.

JMD’s review included compliance with CPUC, Metro,
UPRR and ADA standards and/or requirements. Close
coordination with Metro and former Compton Public
Works Director, Glen W. C. Kau was also provided.

Client: City of Compton
Reference: Mr. Glen W.C. Kau
1315 Valley Drive
Hermosa Beach, CA 90254
(310) 318-0238 Tel.
[email protected]
Duration: 2014-2015
Personnel: J.Diaz, S.Itagaki, G.Andrade
Team: JMDiaz, Inc. (Prime)
2013-2014 Great Streets Improvements Project
City of San Gabriel
JMD provided design and construction
management/inspection services to the City of San
Gabriel for various high priority projects citywide.

Proposed streets for rehabilitation include Fairview
Avenue, North Circle Drive, South Circle Drive, Abbot
Avenue, W. Chestnut Avenue, Alley (North), Alley
(South), Bradbury Drive, N. Mission Drive and W.

Sycamore Drive.

Client: City of San Gabriel
Reference: Mr. Daren Grilley
Public Works Director/City Engineer
917 East Grand Avenue
San Gabriel, CA 91776
(626) 308-2825
[email protected]
Duration: 2013-2014
Design Fee: $165,000 (est.)
Personnel: J.Diaz, S.Itagaki
Team: JMDiaz, Inc. (Prime)
Commuter Bikeway Project
City of El Segundo
JMD prepared preliminary and final design, of new
commuter bikeways (Class I, II and III) along four
streets in the City of El Segundo. The four priority
bikeway corridors were:
• Class I – Metro’s Harbor Subdivision adjacent to
Aviation Boulevard, from Imperial Highway to
Rosecrans Avenue.
• Class II and III – Douglas Street, from Imperial
Highway to Rosecrans Avenue.
• Class II – Nash Street, from Imperial Highway to
El Segundo Boulevard.
• Class II – El Segundo Boulevard, from Aviation
Boulevard to Sepulveda Boulevard.

The new bikeways will serve as attractive and viable
commuter alternatives for employees and visitors of El
Segundo’s commercial and industrial centers. The
bikeways will also link El Segundo destinations and
employment centers to the regional transit system (i.e.

Crenshaw LRT and Green Line).

City of Compton
Additional Street Design Services for Compton Boulevard II-4
Client: City of El Segundo
Reference: Ms. Stephanie Katsouleas
Director of Public Works
1400 Highland Avenue
Manhattan Beach, CA 90266
(310) 802-5000 Tel.
[email protected]
Cost (Eng): $150,000
Cost (Const): $1.5M
Duration (Eng): 2014-2016
Personnel: J.Diaz, S.Itagaki, A.Abad, G.Andrade
Team: JMDiaz, Inc. (Prime)
Yorba Linda Landscape and Maintenance
Assessment District Landscape Transition Design,
City of Yorba Linda
MIG, Inc. worked with the City of Yorba Linda on
developing transition landscape plans for their
medians, parkways and side slope areas that are part
of the Landscape Maintenance Assessment District.

Working closely with the Public Works Director and
Maintenance Manager, MIG has prepared conceptual
re-landscaping plans for three prominent
demonstration sites that occur along major arterial
streets for the community’s review and approval. In
addition, MIG prepared alternative conceptual
landscape plans for typical medians, parkways, lower
slopes, upper slopes, greenbelts and fallow areas.

With over 400 acres of community landscapes, the City
is looking for a measured approach that can be
promptly implemented in phases to replace their urgent
irrigation shutoff and mulch approach which was taken
to significantly reduce the City’s water demands. MIG
has also been contracted to perform public outreach
services to engage the community in the design
process and help to reshape landscape goals into
more sustainable solutions that the community can
support.

Rather than spend a large part of the budget on
construction document design, the City has
commissioned MIG to create a variety of drought
tolerant landscape plan prototypes that the City can
select and bid with detailed performance specifications for targeted implementation by experienced landscape
contractors. This creative approach to construction is a rather bold step to have more flexibility and resource
accountability in this new regenerative, “watershedbased” landscape design.

Client: City of Yorba Linda
Reference: Mr. Michael Wolfe, Public Works Director
4845 Casa Loma Avenue
Yorba Linda, CA 92886
(714) 961-7175 Tel.
[email protected]
Personnel: S.Lang
Team: MIG, Inc. (Prime)
Commerce Way and Sheila Street Connectivity
and Beautification Project, City of Commerce
JMD and subconsultants Geo-Advantec, Inc. and
FHA Consulting Engineers are currently developing
preliminary and final design for a Beautification Project on Commerce Way from Eastern Avenue to
Washington Boulevard. The project includes roadway
rehabilitation, signage, striping, landscaping and
lighting improvements. Two BNSF grade crossings are
being eliminated thus requiring coordination with BNSF
and CPUC staff. The project is an important part of the City’s complete streets strategy designed to provide
community amenities, such as pedestrian linkages and
bikeways to local parks and City Hall.

City of Compton
Additional Street Design Services for Compton Boulevard II-5
Client: City of Commerce
Reference: Ms. Maryam Babaki
Director of Public Works
2535 Commerce Way
Commerce, CA 90040
(323) 722-4805 x2337 Tel.
[email protected]
Cost (Eng): $80,000
Cost (Const): $1.1M
Duration (Eng): 2017-2018
Personnel: J.Diaz, S.Itagaki, A.Abad
Team: JMDiaz, Inc. (Prime)
Geo-Advantec, Inc. - Landscaping
FHA Consulting Engineers - Survey
Geotechnical Testing and Inspection Services for
Wilmington Avenue, City of Compton
Geo-Advantec, Inc. performed as the testing
laboratory for the project and work comprised of
providing field and batch plant inspection for RHMA,
testing and inspection of the subgrade and sampling
and testing of concrete. The project involved repaving
of Wilmington Avenue, which included both grinding 4
inches of the existing A.C. pavement and replacing
with 2 inches of rubberized asphalt over 2 inches of
asphalt base. The project also included the removal
and replacement of existing curb and gutter, sidewalks, the construction of four new cross gutters and the
construction of 29 new ADA ramps.

Client: City of Compton
Reference: Mr. Fred Alamolhoda
LAE Associates
650 N. Rose Drive, # 182
Placentia, CA 92870
(714) 793-2840 Tel.
[email protected]
Team: Geo-Advantec, Inc. - Landscaping
Imperial Highway Rehabilitation, Median
Landscaping, and Traffic Signal Modifications,
City of La Mirada
FHA Consulting Engineers prepared PS&E
documents for pavement rehabilitation and overlay,
pavement removal and reconstruction, raised median
construction, median landscaping and installation of
new irrigation system on two segments of Imperial
highway between Downey Avenue and the West City
Limit and between Bellflower Boulevard and East City
Limit. The work included field walk and field
measurements, preparation of base map, assessment
of pavement conditions for selection of a suitable
method of rehabilitation of existing deteriorated
pavement. Identified damaged, raised, or sunken curb
and gutter, cross gutter and developed solutions to
improve drainage, sidewalk, ADA curb access ramps,
and driveway. Prepared plans for replacing metal pipes
(CMP) with RCP, utility adjustments, demolition and
revamp of concrete facilities and assisted in providing construction support during construction and utility
adjustments, median landscaping and irrigation
system demolition and revamp, installation of SWPPP
filters and implementation of post construction BMP.

City of Compton
Additional Street Design Services for Compton Boulevard III-1

3. KEY PERSONNEL
Project Team
The JMD Team, illustrated below, is composed of highly qualified staff with local City of Compton knowledge and experience and which specialize in streetscape, roadway, traffic, rail, transit and highway engineering projects. Each member of the team has produced streetscape, roadway, grade crossing, utility, traffic signal, signing and striping, traffic control and street lighting projects for a variety of clients and in AutoCAD and MicroStation digital platforms. The Project Team has StreetSaver and Micro Paver software experience. Resumes of our key personnel, illustrated below, are included on the following pages.

Organization Chart
City of Compton
Additional Street Design Services for Compton Boulevard IV-1

4. UNDERSTANDING, APPROACH AND SCOPE
Project Understanding
The City of Compton, who maintains approximately
173 centerline miles of pavement within the City limits, has secured Highway Safety Improvement Program
(HSIP) funds to reconstruct Compton Boulevard, within
City boundaries. The HSIP is a core Federal-aid
program with the purpose of achieving a significant
reduction in traffic fatalities and serious injuries on all public roads.

The proposed improvements will focus primarily on
improving safety through roadway paving which is in
poor condition as well as improving raised median
islands, adding Class II bicycle lanes and enhancing
pedestrian crossings, as well as improving some
parkways, sidewalks and curb ramps which do not
meet ADA standards.

The City applied and obtained an HSIP Cycle 7 and
Cycle 8 grants. Cycle 7 covers the installation of raised medians and Class II bicycle lanes along Compton
Boulevard, from Willowbrook Avenue to the eastern
City limits. Cycle 8 addresses systemic issues along
the Compton Boulevard Corridor by installing bicycle
lanes and lighting along Compton Boulevard from
Willowbrook Avenue as well as enhancing pedestrian
crossings at 15 intersections.

The City is, therefore, procuring the services of a
qualified consultant that can provide professional
engineering design services in a responsive, cost
effective and timely manner. The selected consultant
may ultimately provide review, professional design and
estimate, and engineering services for the
development and preparation of construction
documents.

JMD has extensive experience developing PS&E
design for local arterials in the City of Compton and
throughout Southern California. Such projects include
roadway rehabilitation, safety enhancements,
beautification and widening projects requiring roadway
improvement, grade crossing, traffic signal
installation/modification, traffic signal interconnect, street lighting, signing and striping, and worksite traffic control plans. Some of these projects include
conventional, complete and green street elements
designed to improve transportation access and
circulation in a sustainable and well-funded manner.

JMD anticipates enhancing safety by implementing
applicable conventional and complete street elements,
illustrated on the following page, to best address local access and circulation needs on Compton Boulevard.

Green street elements are less likely due to the safety focus of funding grants obtained. JMD has performed
similar services on Central Avenue in the City of
Compton and is uniquely qualified and experienced to
develop a regionally significant, safe, multimodal,
aesthetically pleasing and sustainable corridor on
Compton Boulevard to meet current Federal funding.

Key Issues
The JMD Team has carefully reviewed the subject RFP
requirements, complemented by field reviews and local
knowledge, and has identified key issues to be
addressed for the project. Key issues are briefly
discussed below.

ADA
Compton Boulevard has curb ramps and sidewalks,
which do not fully meet Americans with Disabilities Act (ADA) requirements. To comply, proposed
improvements will require that curb ramps be provided
at all intersections being modified as well as midblock crossings where pedestrian access is legally provided.

Consequently, careful review and identification of
effective solutions will be required where existing
sidewalk widths do not currently meet ADA criteria,
particularly where traffic signal or lighting equipment prevents meeting ADA walkway requirements. JMD's
traffic engineering staff have developed creative and
innovative solutions to address unique design
constraints.

City of Compton
Additional Street Design Services for Compton Boulevard IV-2
City of Compton
Additional Street Design Services for Compton Boulevard IV-3
Access and Circulation
Access and circulation are vital elements to any City
which serves local and regional traffic. Compton
Boulevard is a perfect example which serves local
businesses, commercial centers as well as regional
commuter and goods movement traffic. Such
conditions and needs require careful planning of the
proposed Compton Boulevard Street Design Services
project to avoid local and regional impacts.

JMD is uniquely qualified to assist the City in planning and designing such construction as a result of its local knowledge, history and Compton project experience
which includes the design of local streets, CDBG
improvements and regional projects such as the Long
Beach (Blue Line) Light Rail Transit Project which
included the Rosecrans Avenue Overpass.

Safety
Compton Boulevard is a primary east-west corridor
which carries a large volume of vehicles and has
numerous crosswalks without stop signs. JMD has
experience identifying high risk locations and reducing risk by either improving visibility, shortening crosswalk lengths, adding bulb-outs as well as providing signage, lighting or a combination of these methods to ensure
pedestrian safety crossing Compton Boulevard.

Right of Way
Accurate right of way boundaries are essential due to
the high cost of acquiring right of way. In the case of Compton Boulevard, avoiding right of way acquisition
will be important especially when considering the
modification of curb ramps which currently do not have
the required landing at the top of ramps. JMD staff are highly experienced in working with local agencies to
avoid costly right of way acquisition associated with
providing ADA compliant curb ramps and sidewalk.

Drainage/Utilities
Compton Boulevard has various locations involving
drainage (ponding) and utility conflicts. Drainage in
Compton is a significant challenge to the extremely flat (near 0%) grades on City streets. In addition, the
presence of overhead and underground utilities will
require careful coordination to minimize conflicts and
avoid relocation as much as possible. Some of these
utilities may require protection, relocation or removal.

In addition, these utilities may require exposure and
permanent support during construction.

The JMD Team has experience designing
improvements involving a vast number of utilities and
will provide timely coordination to avoid unnecessary
and costly utility conflicts. We will coordinate required utility work with the City and the various utility owners and be proactive at the beginning of the project in
City of Compton
Additional Street Design Services for Compton Boulevard IV-4
obtaining accurate utility data for necessary
notifications, reviews and processing requirements.

Existing Pavement
Existing asphalt and concrete pavement within
Compton Boulevard shows varying degrees of
rehabilitation needs. In fact, JMD has the City’s
Pavement Condition Index (PCI) Report covering
citywide street segments which indicates that Compton
Boulevard has a very poor average PCI of 27 at Central
Avenue.

JMD has unique solutions (e.g., Full Depth
Reclamation) to maximize pavement rehabilitation
investments by local agencies for arterials with asphalt and concrete pavement. In fact, JMD designed the
reconstruction (i.e., relying on FDR) of nearly two miles of roadway along Central Avenue, within the City of
Compton, containing asphalt concrete and concrete
pavement and extending perpendicular to Compton
Boulevard.

Base Mapping
An accurate representation of existing conditions is
critical to providing a design that is constructible.

Attention to detail during the collection of base data will result in minimal changes during the construction
phase. Coordination of new work with existing
improvements becomes critical in providing a
seamless project. In an urban environment there are
many existing improvements such as pull boxes, meter
vaults, catch basins, existing landscaping, driveways,
hardscape and other small improvements that can
cause significant problems during construction if not
addressed during the design phase. Our base plan
preparation efforts, which include field walks before the preliminary and final plan submittal phases, will
minimize potential for oversight in this area. Any
potential conflicts will be identified upfront and
discussed with City staff early for timely resolution.

Existing Landscaping
Existing landscaping and hardscape elements along
Compton Boulevard will need to be evaluated and
addressed to eliminate sidewalk panel uplifting
conditions caused by major tree roots. In addition,
sustainable and aesthetically pleasing landscaping
that fits within the City's preferred corridor cross
section for Compton Boulevard will be developed to
provide the City of Compton with a corridor that meets
current trends with conventional and complete street
amenities, as appropriate.

Traffic Control During Construction
Commuter, commercial and truck traffic volumes along
Compton Boulevard will require providing adequate
traffic control during construction via alternative
roadway facilities, such as parallel streets with
adequate capacity to handle a portion of displaced
traffic during construction.

Responsiveness
The City’s workload and schedule will require
immediate responsiveness by JMD to ensure that the
project schedule is maintained. JMD will provide such
responsiveness by providing a Project Manager who
understands the critical path in the roadway design
City of Compton
Additional Street Design Services for Compton Boulevard IV-5
process and has the working relationships with the key
decision makers at the City, County, Caltrans,
LACMTA, UPRR, ACTA and CPUC to streamline
project development activities.

JMD believes that the success of this project will
depend upon adequately addressing these key issues
during preparation of the preliminary and final submittal package.

Approach
JMD’s approach is to be Service-Oriented and keep
the City informed throughout the project. We will meet
with City staff first to verify the City’s expectations for the project and our proposed scope, schedule and
process.

Once we are issued a Notice to Proceed for each
phase, we will begin three initial tasks including: 1)
collection of existing conditions via field reviews and photo logging of existing conditions; 2) letters of
notification will be sent to impacted utility owners
requesting verification of existing facilities and
proposed improvements; 3) preparation of a
preliminary base map which will be utilized to develop
and validate an understanding of the conceptual plans
and for use as the base plan sheets for the plan
preparation. JMD will present the base map to the City
during a brief job walk to identify existing constraints and define or adjust the proposed improvements. The
purpose of this jobwalk will be to make adjustments in
the phasing and to verify and finalize the specific
improvements to be designed based on the availability
of project funding.

After approval of the base mapping and
conceptual/preliminary plan sheets by the City, JMD
will proceed with preparation of the final improvement
plans for each respective phase when authorized to
proceed by the City. Plans will be prepared to include
title sheet, typical sections and details, roadway, grade crossing, signing and striping, street lighting, traffic control, landscape, irrigation and storm water pollution protection plans, as appropriate. JMD will prepare the
bid item list and opinion of probable construction cost.

JMD will process the submittal packages with the City
for approval.

All plans will be delivered to the City in CAD format
along with a CD for future use by the City.

Specifications, bid items and construction cost
estimates will be prepared using electronic word
processing (MS Word) and spreadsheet (MS Excel)
formats.

JMD will utilize existing information available from
previous plans, studies, reports, investigations and
analyses as a basis to begin any design work. This
information will be augmented and updated, where
required. Because they are typically on a project
schedule’s critical path and may require substantial
lead time, the following tasks will begin immediately
upon receipt of Notice to Proceed:
 Research and Data Collection
 Utility Identification and Coordination
 Identification of Right-of-Way Requirements
JMD will meet with City staff responsible for review of design elements of the 30%, 60%, 90% and 100%
plans as we are working on them. Draft copies of this
work will be submitted for significant work items before the milestone submittal date with a follow-up meeting
to solicit input. This early coordination gives us a clear understanding of what the reviewers expect while
giving the reviewers a preview of what will be submitted before the actual submittal is made.

Design of transportation improvements on existing
facilities in typically highly urban setting presents some unique issues and requires experienced design
techniques. Such issues may include:
 Utility location/relocation
 Existing conditions and compliance with current
standards (Knowing when to upgrade existing
facilities to current design standards and that
impact on the project schedule and costs)
 Construction staging and traffic control
Based on our past experience, we understand the
complexity of retrofitting existing transportation
facilities while maintaining basic services, traffic flow and minimizing impacts to roadway improvement
projects.

We believe that the success of any project will depend
upon adequately addressing key issues during the
project development process and preparation of the
preliminary and final plans and estimates package.

Once the preliminary phase work tasks have been
City of Compton
Additional Street Design Services for Compton Boulevard IV-6
completed, reviewed and approved by the City, JMD
will incorporate comments and begin work on the final
design phase, which includes the preparation of final
plans, specifications and estimate.

Scope of Work
Our proposed scope of work has been specified as
follows:

Phase 0 – Project Initiation and
Management
Task I-1 – Project Administration, Coordination
and Meetings
The JMD Team will meet with City staff and confirm the
project scope, establish key communication personnel,
refine time schedules and finalize design criteria. After review of the process to be followed, agreement on the
design concept and schedule will be reached. This will
avoid confusion and delays later in the project
development process and facilitate timely review and
approval of submittals.

Meetings between the City and JMD will be held to
keep all parties informed, resolve issues and
successfully complete the project. Written progress
reports will be prepared monthly to assess project
progress, identify issues and outline planned work
tasks and submittals. A monthly schedule, in MS
Project, will also be provided.

Coordination meetings with City staff will include
agencies such as Los Angeles County to provide
sufficient advance notification prior to the
commencement of construction activities.

This task assumes up to one (1) kickoff meeting and
five (5) coordination meetings.

Deliverable(s): Project related correspondence,
meeting agendas, meeting minutes, schedule,
progress reports and invoices.

Phase 1 – Preliminary Design (30%)
Task I-2 – Research/Data Collection/Utility
Coordination
JMD will obtain documentation available from the City
and/or County records pertaining to this project. We
will assemble, sort and review existing available
information on the project area, including "as-built"
plans, maps, studies, existing right-of-way and utility information in order to become familiar with the project, ascertain the completeness and accuracy of available
information and determine additional information
requirements. Although not anticipated, JMD can
assist in coordinating any easement documents for any
traffic signal equipment that may be located on private property. Field reviews will be performed, as
necessary, to verify that existing information is correct or to identify existing facilities unavailable during
research.

Due to the straightforward nature of the project, field review(s) for the project could consist of the following:
 The project site will be field inventoried to
determine proposed locations of signal
equipment, signing and striping adjacent to the
intersection, right-of-way, curb and gutter,
sidewalk and miscellaneous topographic features.

City and County right of way boundaries will be
identified, if any. This inventory will also identify
potential utility conflicts.
 Any recommended additions or deletions to the
project will be developed at this time. A
recommendation will be made regarding
improvements necessary to achieve the City’s
objectives.
 After determination of the desired objectives for
the roadway improvements, affected agencies will
be contacted regarding specific requirements that
they have and also if they have committed to
related improvements which would be
implemented within the time frame of the City’s
project. Any concurrent projects encountered will
be identified.

JMD will coordinate with utility companies involved to
identify existing underground and overhead utility lines that may interfere with the proposed improvements.

JMD will send a preliminary notice to each utility
company with facilities in each project area. The
notices will request plans for any existing or planned
improvements, prior rights information and, if required, a preliminary cost estimate and schedule for each
company for any required relocation. JMD will also
review the information obtained from the City and utility companies and make recommendations of the
locations for underground investigations, including
potholing, to determine utility locations and depth. This task assumes three (3) pothole locations.

City of Compton
Additional Street Design Services for Compton Boulevard IV-7
Task I-3 – Geotechnical Analysis/Report
JMD’s geotechnical subconsultant, Geo-Advantec,
Inc., will conduct geotechnical investigations specific to Compton Boulevard, between North Willowbrook
Avenue and Long Beach Boulevard, and prepare a
geotechnical report documenting project findings. This
segment needs analysis to address pavement
improvements conducted by the City. The report will
yield an R-value that will allow JMD to determine the
appropriate Traffic Index and subsequent pavement
structural section for Compton Boulevard.

Task I-4 – Surveying
JMD’s surveying subconsultant, FHA Consulting
(FHA), will perform the following tasks for the Compton Boulevard segment between N. Willowbrook Avenue
and Long Beach Boulevard:
 Perform design surveys in the field along Compton
Boulevard from westerly to easterly City Limit
lines, all with cross sections every 50 feet.
 Provide AutoCAD .dwg digital file of survey points
including break lines.

Utilizing the survey data and base mapping provided
by FHA, JMD will prepare base plans for the project.

Task I-5 – Pavement Engineering/Traffic Index
Calculations (Not Included – See HSIP Scope)
As an optional task, JMD may conduct pavement
engineering to determine the optimal pavement
section(s) for Compton Boulevard. Determining the
most appropriate and economical pavement
rehabilitation strategy for the roadway pavement is not always as simple as it sometimes seems. Each project
of this type has its own unique characteristics and
potential pitfalls. From a technical standpoint,
determining the thickness of a structural section based on the R-value and Traffic Index (TI) is a straight
forward process. However, determining the best
pavement rehabilitating approach is based on a
combination of factors including economical (project
cost vs. benefit), practical (desired life cycle,
constructability, urban set up) and even political
factors.

It has typically been JMD’s experience that the design
of the final pavement rehabilitation strategy requires a detailed review of the Geotechnical Report. Due to our
extensive experience in pavement rehabilitation
projects, evaluating and considering refinements to the general recommendations in the Geotechnical Report
is one of JMD’s specialties. As a result, we will develop the "Best Fit" and most cost-effective rehabilitation
strategy for the City to consider for this project.

The rehabilitation strategy will be based on the
information contained in the pavement
evaluation/geotechnical report prepared by our
geotechnical subconsultant. This report will consider
subsurface and surface conditions and properties to
evaluate existing pavement and make general
recommendations for rehabilitation.

JMD’s pavement engineering approach to this project
is to provide comprehensive yet efficient investigations so that cost effective pavement rehabilitation methods
are achieved. As such, a field mapping/survey of the
entire pavement surface within the subject streets will be performed for the purpose of identifying areas of
distress, degree of distress to allow categorizing the
street areas so that appropriate subsurface
investigations can be implemented.

The investigation will identify areas of variable distress based on field survey/observations. Based on past
experience and an initial site visit of the streets, three categories of pavement distress are anticipated and
the corresponding economical rehabilitation measures
are described as follows in accordance with the PCI
graph below:

Category 1: Fair/Good Pavement Condition
This category is generally assigned to street pavement
sections that appear to be in fair-good condition with
minimal or more distress related cracks and adequate
pavement section. Pavement rehabilitation for this
category may include:
 1.5” of AC overlay
 Cape sealing
 Slurry sealing
 Localized R&R (minimum)
City of Compton
Additional Street Design Services for Compton Boulevard IV-8
Category 2: Poor Pavement Condition
This category is generally assigned to street sections
with acceptable subgrade conditions while pavement
surface is characterized with severe alligator cracks
and poor ride quality. Depending on actual AC
thickness for each section, pavement rehabilitation for this category may include:
 2.0”-3.0” of mill and overlay (HMA or ARHM) to
meet required life span
 Stress Absorbing Membrane Interlayer (SAMI)
 Localized R&R
Category 3: Failed/Very Poor Pavement Condition
This category is generally assigned to pavement
sections with severe alligator cracking and pavement
failure caused primarily by subgrade/base failure.

Depending on existing AC/AB thicknesses for each
section, pavement rehabilitation for this category may
include:
 Complete removal of existing pavement and
placement of new 20-year service life pavement
section on top of properly prepared/treated
subgrade
 Pulverize existing AC/AB and, if necessary,
remove subgrade to a depth sufficient to allow for
placement of a new HMA layer on top of the
properly pulverized and/or cement treated AB and
properly compacted subgrade
Pavement evaluation and design will be generally in
accordance with Caltrans Highway Design Manual and
applicable City standards.

Existing conditions to be considered during design
include:
 Existing subgrade properties, especially the
presence of clayey soils
 Excessive subgrade moisture due to natural
causes or excessive irrigation runoff by local
homeowners
 Existing AC thickness
 Required structural sections or overlay thickness
 Extent of failed areas
 Pavement cross falls
 Existing concrete pavement conditions
 Crack treatment in overlay areas
 Construction considerations
 Consideration for using geofabrics for stabilization
of soft clay or decrease reflective cracking and/or
increase roadway structural section strength and
bridge soft soil stratum
 Construction phasing considerations
Based on our preliminary field observations, we
envision several options including the following:

1. Mill and overlay using Asphalt Rubber Hot mix
(ARHM) with localized R&R where needed

2. Cold In Place Recycling (CIPR) with addition
of ARHM of wearing surface

3. Full Depth Reclamation (FDR) with cement
treated base
JMD will complement pavement options with designs
intended to improve rideability.

JMD will develop 10-ft grids for major intersections to prevent "birdbaths" and provide smooth transition for
the vehicles crossing the intersection.

JMD will present the City with viable strategies that
would be recommended as alternatives for pavement
upgrades using Value Engineering (cost benefit
analysis) spreadsheets with detailed cost breakdowns
for each strategy including comparisons based on the
life span.

Task I-6 – Hydrology/Hydraulic Analysis/Report
JMD will conduct hydrology and hydraulics analyses to
determine existing flow rates on Compton Boulevard
as well as propose and size drainage facilities
(applicable storm drain, catch basins, etc.) to handle
the necessary flows in accordance with current
standards. JMD will prepare a hydrology and hydraulic
report for the project.

Task I-7 Landscaping Concept (Not Included – See
HSIP Scope)
As an optional task, JMD’s landscape architect
subconsultant, MIG, Inc., will develop the landscaping
City of Compton
Additional Street Design Services for Compton Boulevard IV-9
concept for Compton Boulevard that ties hardscape,
lighting and site furnishings designs.

Task I-8 Community Meetings (Not Included – See
HSIP Scope)
As an optional task, JMD will assist the City with
community outreach efforts with local businesses and
residents to inform the public. In addition, JMD will
provide project notification by mail to adjacent property owners prior to construction efforts.

Meetings
JMD will attend three (3) meetings, including
meetings/briefings with City Staff, Traffic Commission
and City Council. The meetings will explain the
purpose and need of the project as well as present
design and engineering considerations. The meetings
also will be a forum to obtain feedback from both
stakeholders and city representatives about potential
impacts and other options or variations that may be
explored. Meetings will be located in surrounding
schools for ease of access and a large public meeting
held in the Council Chambers to present the final
findings and recommendations.

Task I-8 Right of Entry (ROE) Permit Application
(Not Included – See HSIP Scope)
As an optional task, JMD can prepare a Right of Entry
(ROE) permit application required to allow the City and JMD Team to enter Metro, UPRR and/or ACTA railroad
corridor to conduct field activities within 25 feet from the nearest track. The cost for obtaining flagging and
Railroad Protective Liability Insurance (RLPI), are not included in this task.

Task I-9 Diagnostic Meetings (Not Included – See
HSIP Scope)
As an optional task, JMD can schedule up to two
diagnostic meetings with the City of Compton, Metro,
UPRR, ACTA and CPUC to evaluate and discuss
existing conditions and proposed grade crossing
improvements at up to two crossings. The initial
diagnostic meeting presents the preliminary design
plans to all parties for the purpose of obtaining input from all rail entities prior to beginning final design
efforts. The initial diagnostic meeting will confirm the basis for the proposed improvements and initiate the
agency and railroad review process. This task provides
two diagnostic related meetings.

Phase 2 – 60% Design
Task ll-1 – Preliminary Plans
After review and approval of the detailed
recommendations, JMD will prepare preliminary
construction plans for the proposed roadway
improvements. JMD will develop a conceptual exhibit
to confirm that the proposed roadway improvements
will not encroach within City or County right of way. In addition, plans will comply with the regulations and
standards of the City and State of California, as
applicable. The following outlines the specific details of the design plans:

Title Sheet
JMD will prepare a title sheet containing a vicinity map, general and construction notes, construction legend,
list of affected utilities, a drawing list and other details covering the project limits.

Typical Sections and Detail Plans (Not Included - in
Original Project)
JMD will prepare typical sections and details at
appropriate scales to illustrate existing and proposed
roadway and structural pavement sections as well as
provide miscellaneous construction sections and
details.

Roadway Improvement Plans
JMD will prepare detailed roadway plans consisting of
plan and profile at a scale of 1”=20’, on City title block and detailing existing and proposed roadway features
and details. The roadway plans will include
recommended access ramps, driveways, and sidewalk
improvements.

Grade Crossing Plan (Not Included - in Original
Project)
JMD will prepare a detailed grade crossing plan
consisting of plan only at a scale of 1”=20’, on City title block and detailing existing and proposed grade
crossing protection, features and details. The grade
crossing plan will be prepared for the Long Beach Blue
Line crossing to comply with Metro, UPRR and CPUC
requirements.

Intersection Plans
JMD will prepare detailed intersection plans at a scale of 1”=10’, including intersection grids with elevations.

The intersection plans will detail proposed widening
and include curb ramps as well as replace colored
concrete with gray concrete.

City of Compton
Additional Street Design Services for Compton Boulevard IV-10
Curb Ramp Details
JMD will prepare curb ramp details at a scale of 1”=10’, illustrating curb ramp modifications, tactile warning
strips and landings in accordance with ADA
requirements.

Storm Drain Plans and Details
JMD will prepare storm drain plans for proposed storm
drain lines and catch basin improvements. The plans
will consist of plan and profile and will be prepared at a scale of 1”=20’ (horizontal) and 1”=4’ (vertical). The
plans will detail catch basin relocations.

Cross Sections (Not Included – See HSIP Scope)
JMD will prepare cross sections every 50 feet detailing proposed improvement limits and earthwork quantities.

Signing and Striping Plans (Not Included - in Original
Project)
JMD will prepare detailed signing and striping plans at a scale of 1”=40’ using the City-provided title block.

These plans will identify existing and proposed signing and striping features including bikeway features, if any.

In lieu of traffic signal modification plans, loop
replacements, due to paving improvements, will be
shown on signing and striping plans.

Street Lighting Plans (Not Included - in Original
Project)
JMD will analyze illumination levels required and
prepare street lighting plans at a scale of 1”=40’ and
detailing the proposed undergrounding of existing
roadway lighting with standard pull boxes and light
standards. Lighting plan designs will be coordinated
with our landscape architect, MIG, to ensure that
proposed trees do not conflict and impede illumination
levels required for proposed lighting.

Traffic Staging Plans (Not Included - in Original
Project)
JMD will prepare traffic staging plans, at 1”=40’, for up to two construction phases for roadway segments and
up to nine construction stages at major intersections.

Traffic Control Plans
JMD will prepare traffic control plans for storm drain
improvements at a scale of 1”=40’ for up to two
construction phases for roadway segments and up to
nine construction stages at major intersections.

Landscaping and Irrigation Plans
Our landscape architect subconsultant, MIG, will
prepare landscaping and irrigation plans at appropriate scales to detail proposed landscaping features and
related irrigation within proposed sidewalks and raised median islands, as appropriate.

Hardscape Plans
Our landscape architect subconsultant, MIG, will
prepare hardscape plans at appropriate scales to detail proposed hardscape features including street furniture
and decorative paving.

Considering the City’s parade route (Alameda Street to
Bullis Road) and the City’s interest in avoiding fully
landscaped medians islands on the route, this proposal
assumes 30 medians as follows:
 10 - Fully Raised and Landscaped Medians
 6 - Parade Route Non-Raised Medians
 4 - Parade Intersections w/Non-Raised Medians
 10 - Other Raised Medians w/minor improvements
Optional Drawings
The following drawings are not currently included in
this proposal due to the straightforward nature of the
project as confirmed with City staff. JMD, however, can prepare optional plans described below following
negotiation and scope amendment with City staff.

Traffic Signal Modification Plans
JMD will prepare traffic signal modification plans for
each signalized intersection modified. The traffic signal modification plans will be prepared at a scale of 1”=20’ and will include equipment schedules, conductor
schedules as well as detail signal equipment
modifications and traffic signal loop replacement.

Traffic Signal Interconnect Plans
JMD will prepare traffic signal interconnect plans
covering signalized intersections. The traffic signal
interconnect plan will be prepared at a scale of 1”=40’ and will include interconnected signal details.

Utility Relocation Plans
Due to the limited nature of the rehabilitation
improvements, JMD has assumed that major utility
relocation plans will not be necessary and are,
therefore, not included in this proposal. However, JMD
will identify potential conflicts, if any, with the City.

Storm Water Pollution Prevention Plans (SWPPP) -
Optional
If the City prefers SWPPP be prepared by the design
consultant and not the Contractor, JMD may prepare
storm water pollution prevention plans for the project.

City of Compton
Additional Street Design Services for Compton Boulevard IV-11
Deliverables
The following are the estimated plan sheets and
related quantities for the project:

Plan Sheets Qty
Title Sheet 1
Typical Sections and Detail Plans -
Roadway Improvement Plans 19
Grade Crossing Plan -
Intersection Plans 4
Curb Ramp Details 23
Storm Drain Plans and Details 18
Cross Sections -
Signing and Striping Plans -
Street Lighting Plans -
Traffic Staging Plans -
Traffic Control Plans 34
Landscaping and Irrigation Plans 4
Hardscape Plans 4
Total* 107
* Not including cross sections.

Task II-2 Notice of Intent and SWPPP Construction
Booklet (Not Included – See HSIP Scope)
As an optional task, JMD can prepare a notice of intent (NOI) to be filed with the State Water Resources
Control Board (SWRCB). In addition, JMD will prepare
a Storm Water Pollution Prevention Plan (SWPPP)
booklet designed to provide a guide for the Contractor
to follow. The booklet would include items such as Best Management Practices (BMPs) to be followed for the
project.

Task ll-3 Construction Bid Items and Opinion of
Probable Construction Cost
JMD will prepare a list of construction bid item
quantities and construction cost estimates for the
project elements, which will include a proposed item
list, estimated quantities, and current unit cost resulting in line-item cost estimates. At the first plan check, a preliminary cost estimate will be developed for
comparison with previous project budget estimates.

Back-up of cost estimate calculations showing
quantities and unit costs per sheet will be provided to the City for review with each submittal. During final
design, JMD will prepare a final estimate to validate
construction bids by contractors during the bidding
process.

Tasks II-4 Specifications
JMD will prepare technical specifications and Bid
Package using Greenbook format as provided by the
City. JMD will provide hard copy and digital (MS Word)
formatted specifications to the City. This task assumes that the City will provide boilerplate and ultimate
packaging of the specifications.

Task II-5 Easement/License Coordination (Not
Included – See HSIP Scope)
As an optional task, JMD can coordinate with Metro,
UPRR and ACTA for the preparation of easements or
licenses required for new improvements to be
constructed within Metro, UPRR or ACTA property,
respectively. The easements or licenses are assumed
to be prepared and executed by Metro, UPRR and/or
ACTA.

Task II-6 Construction and Maintenance (C&M)
Agreement (Not Included – See HSIP Scope)
As an optional task, JMD can coordinate the
preparation of a Construction and Maintenance (C&M)
agreement defining the roles and responsibilities of the City, Metro, UPRR and/or ACTA, if any. The C&M
agreement will define payment responsibilities for
construction of the grade crossing improvements and
require an estimate for railroad signal improvements to be prepared by Metro and/or ACTA.

Task II-7 CPUC Application (Not Included – See
HSIP Scope)
As an optional task, JMD can prepare one (1)
application to be submitted to the CPUC for the
proposed grade crossing modifications. There are two
types of applications that can be prepared depending
on the extent of the improvements. The preparation of
a CPUC application would cover the ultimate (i.e.,
permanent) improvements and not interim
improvements during construction.

Due to the proposed improvements, this task assumes
a General Order 88B (i.e., GO 88B) application will be
required. The application will include exhibits detailing the proposed crossing protection and improvements.

Phase 3– 90% Design
Task lll-1 – Address/Incorporate Comments and
Prepare 90% Submittal
JMD will address and incorporate review comments
provided by the City departments for the project. We
anticipate a submittal of six (6) sets of plans (hard
copies and digital pdf) for each submittal to the City for City of Compton
Additional Street Design Services for Compton Boulevard IV-12
review. Separate plan sets will be submitted to utility agencies for review and comment.

Phase 4 – Final (100%) Design
Task lV-1 – Address/Incorporate Comments and
Prepare Final Submittal
JMD will address and incorporate review comments
provided by the City departments for the project.

JMD will submit sealed original ink on mylar plan
sheets and digital engineering plans and drawings on
CDs in CAD format; sealed original hard copy and CD
in MS Word and Excel format of the bid items, cost
estimates, calculations and notes generated by the
project.

The following are the proposed deliverables:

1. One (1) set of original plans on 24”x36” mylar
sheets, two (2) sets of reproducible half size plans,
and one (1) set of specifications, construction bid
items and cost estimates.

2. Digital files of final documents in AutoCAD, MS
Word and Excel format.

Phase 5 – Post Design
Task V-1 – Bidding and Preconstruction
Assistance (Not Included – See HSIP Scope)
JMD will assist in answering questions regarding
omissions or conflicts in the design during the bidding process, pre-bid meeting and preconstruction meeting.

This task includes the preparation of minutes and
addenda regarding omissions or conflicts in the design
as well as answering questions, in writing, during the
bid process. JMD will verify and evaluate bids,
including accuracy/quality checks as well as provide
input to the recommended lowest bidder for contract
award. This task assumes two (2) meetings.

Task V-2 – Design Support During Construction
JMD will assist the City by reviewing Requests for
Information (RFIs) and shop drawings as well as
design adjustments related to the project’s
construction activities. This task assumes four (4)
meetings.

Task V-3 – As-Built Plans
Upon construction completion, JMD will assist the City
by preparing as-built plans and including design
modifications recorded during construction. The asbuilt plans will be submitted to the City for record purposes.

The process flow chart on the following page
illustrates proposed tasks and their sequence:

Exceptions to the Contract
JMD has reviewed the sample professional services
agreement in the RFP and can execute it without
exceptions once updated for the subject project.

Assumptions
 Environmental documentation and permitting
assessment are not included in this proposal.
 Right of Way acquisition is not proposed.

City of Compton
Additional Street Design Services for Compton Boulevard IV-13
City of Compton
Additional Street Design Services for Compton Boulevard IV-14
Proposed Schedule
JMD proposes the following design and construction schedule. In order to adhere to the City’s requested timeline, JMD proposes continually working through phases while the City reviews the previous phase’s plans.

Fee Proposal
JMD’s fee proposal to provide additional street design services for Compton Boulevard is located on the following page.

City of Compton
Additional Street Design Services for Compton Boulevard V-1

5. COST PROPOSAL
JMD’s proposed fee is included on the following page.

ADA and Drainage Improvements

PIC/ SR SR DES

PROJECT QA/QC TRAFFIC PROJ ENG CAD

DESCRIPTION MANAGER MANAGER ENG ENG ANALYST DRAFTER CLERICAL INTERN TASK $212.99 $176.00 $169.02 $153.16 $96.37 $77.72 $34.38 $65.12 PHASE 0 - PROJECT INITIATION AND MANAGEMENT
I-1 Project Administration, Coordination and Meetings (maximum of 6 meetings)b 40 0 0 20 0 0 20 0 80 $ 2,000.00 $ 14,270.33 * Deliveries/Mileage/Reproduction

PHASE I - PRELIMINARY DESIGN
I-2 Research/Data Collection/Utility Coordination 4 0 0 24 24 24 0 24 100 $ 1,800.00 $ 12,068.93 * Deliveries/Mileage/Reproduction I-3 Geotechnical Analysis/Report 2 0 0 0 0 0 0 0 2 $ 15,000.00 $ 15,425.98 * GEO Advantec I-4 Surveying 2 0 0 0 0 0 0 0 2 $ 25,380.00 $ 25,805.98 * FHA Consulting I-5 Pavement Engineering/Traffic Index Calculations (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - * NDS (Traffic Counts) I-6 Hydrology/Hydraulics Analysis/Report 12 60 0 120 140 160 20 40 552 $ - $ 60,715.17 I-7 Landscaping Concept (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - I-8 Community Meetings (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - I-9 Railroad Right of Entry (ROE) Permit Application (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - I-10 Diagnostic Meetings (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - PHASE II - 60% DESIGN
II-1a Title Sheet (1 sheet) 1 1 1 4 4 16 0 4 31 $ - $ 3,060.20 II-1b Typical Sections and Detail Plans (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-1c Roadway Improvement Plans (19 sheets) 16 40 0 140 180 180 8 80 644 $ - $ 68,711.96 II-1d Grade Crossing Plan (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-1e Intersection (Color Removal) Plans (4 sheets) 2 12 0 20 40 60 2 4 140 $ - $ 14,448.76 II-1f Curb Ramp (114 ADA, 49 Color and 49 Tactile Improvements) Details (23 sheets) 8 80 200 300 360 360 4 170 1482 $ - $ 169,417.91 II-1g Storm Drain Plans and Details (18 sheets) 40 60 0 100 120 160 36 80 596 $ - $ 64,843.05 II-1h Cross Sections (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-1i Signing and Striping Plans (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-1j Street Lighting Plans (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-1k Traffic Staging Plans (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-1l Traffic Control Plans - Storm Drain (34 sheets) 12 40 80 100 140 160 16 100 648 $ - $ 71,423.25 II-1m Landscaping and Irrigation Plans (4 sheets) 0 0 0 0 0 0 0 0 0 $ 42,000.00 $ 42,000.00 * MIG II-1n Hardscape Plans (4 sheets) 0 0 0 0 0 0 0 0 0 $ 42,000.00 $ 42,000.00 * MIG II-2 Notice of Intent and SWPPP Construction Booklet (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-3 Construction Bid Items and Opinion of Probable Construction Cost 2 4 0 8 8 0 0 8 30 $ - $ 3,647.15 II-4 Specifications 2 4 0 8 8 8 0 8 38 $ - $ 4,268.95
II-5 Easement/License Coordination (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-6 Construction & Maintenance (C&M) Agreement (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - II-7 CPUC Application (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - PHASE III - 90% DESIGN $ 195,952.56
III-1 Address/Incorporate Comments and Prepare 90% Submittal 20 60 200 300 400 500 16 360 1856 $ - $ 195,975.27 * Deliveries/Mileage/Reproduction PHASE IV - FINAL DESIGN $ 65,317.52
IV-1 Address/Incorporate Comments and Prepare Final Submittal 16 40 60 100 120 160 8 80 584 $ - $ 65,389.91 * Deliveries/Mileage/Reproduction

PHASE V - POST DESIGN
V-1 Bidding and Preconstruction Assistance (Not Included - See HSIP Scope) 0 0 0 0 0 0 0 0 0 $ - $ - V-2 Design Support During Construction 12 0 0 12 16 16 12 12 80 $ 320.00 $ 8,693.33 V-3 As-Built Plans 1 0 0 8 16 16 2 0 43 $ - $ 4,292.60
152 401 541 1,244 1,576 1,820 124 970 6,828
ESCALATION (3 YEARS) $ 46,186.26
$ 128,500 $ 932,644.98
Notes:
a Rates are subject to a 5% annual increase on January 1. b Potholing is not included.
c Does not include CPUC Permitting.
d Assumes half the length of Compton Boulevard for storm drain design. e Does not include major (i.e., sewer lines and other gravity flow systems) utility relocation and adjustment. p-077jmdfee.xls

TOTAL ESTIMATED DESIGN COST (WITH ESCALATION)
TOTAL
LABOR
HOURS
DIRECT
COSTS*
TOTAL

COSTS REMARKS

TOTAL ESTIMATED LABOR HOURS
December 20, 2021
Fee Proposala-d
Compton Boulevard Rehabilitation (West to East City Boundaries) City of Compton
Submitted by: JMD
Concept
• Roadway Alignment
• Streetscape Amenities (furniture, etc.)
• Traffic Signal Equipment
• Left Turn Pocket Lengths/Median Dimensions
• Gateway Monument Details
Analysis
• Left Turn Pocket
• Traffic LOS
60%
Plans
90%
PS&E
100%
PS&E
Base
Plans
Geotech
Report
Data
Collection
Field
Surveying

HSIP & REHAB

STREETSCAPE
Complete Not Complete

COMPTON BOULEVARD RECONSTRUCTION

FIRST AMENDMENT
TO

PROFESSIONAL SERVICES AGREEMENT

BETWEEN

CITY OF COMPTON
AND
JMD, INC.

This FIRST AMENDMENT to the Professional Services Agreement is made by and between the CITY OF COMPTON, a municipal corporation of the State of California (hereinafter referred to as “CITY”) and JMD, INC. (hereinafter referred to as “CONSULTANT”).

RECITALS:

WHEREAS, the City maintains approximately 173 centerline miles of pavement within its boundaries and there is a need to provide pavement resurfacing design services located on Compton Boulevard; and
WHEREAS, the City has secured funds from the Highway Safety Improvement Program Grants Cycle 7 which will entail the installation of raised medians and Class II bicycle lanes along Compton Boulevard from Willowbrook Avenue to the eastern City limits and the Highway Safety Improvement Program Grant Cycle 8 which will address systemic issues along the Compton Boulevard Corridor by installing bike lanes and lighting along Compton Boulevard from Willowbrook Avenue to the western City boundaries as well as enhancing pedestrian crossings at 15 intersections; and
WHEREAS, the Highway Safety Improvement Program is a core Federal-aid program with the purpose of achieving a significant reduction in traffic fatalities and serious injuries on all public roads; and
WHEREAS, the City has determined that it will be prudent to engage the services of a professional and experienced engineering firm to act as the City’s Engineer for this Project and be responsible to provide design and engineering services for the Compton Boulevard Street Improvement project, including design support services during construction; and WHEREAS, there is a need to amend the original agreement to provide additional design services and provide additional compensation in the amount of $932,644.98.

WHEREAS, by Resolution No. _____, adopted on the ___ day of _________ 2022, the City Council authorized the City Manager to enter into a first (1ST ) amendment to the professional services agreement with Consultant; and
WHEREAS, Consultant warrants that it is specifically trained, experienced, competent, and has the resources to provide such services which will be required by this project; and WHEREAS, Consultant is willing to render such professional services subject to the terms and conditions set forth in this Agreement.

NOW, THEREFORE, Consultant and City, for the consideration, terms and conditions herein described, do hereby mutually agree to amend the original Agreement as follows:

First Amendment to Professional Services Agreement – JMD Compton Boulevard Street Improvement Project
Public Works/Resolution No. ______
2 AMENDMENTS:

1. The parties agree to amend Section 1 – Services to be rendered by Consultant of the original Agreement to authorize the continued performance of the services specified within the original Agreement and expand the scope of services to include performance of the following services:

Phase 0 Project Initiation and Management
Task I-1 Project Administration, coordination and meetings, project related correspondence, meeting agendas,
meeting minutes, schedule, progress reports and
invoices
Phase I Preliminary Design (30%) – Plans, Specifications, & Estimates Task I-2 Research/Data Collection/Utility Coordination
Task I-3 Geotechnical Analysis/Report
Task I-4 Surveying/ROW Engineering/Base Plans
Task I-5 Pavement Engineering/Traffic Index Calculations Task I-6 Landscape Concept
Task I-7 Community Outreach
Task I-8 Right of Entry (ROE) Permit Application
Task I-9 Diagnostic Meetings
Phase 2 60% Design
Task II-1 Preliminary Plans
Task II-2 Notice of Intent and SWPPP Construction Booklet Task II-3 Construction Bit items and Opinion of Probable Construction Cost
Task II-4 Specifications
Task II-5 Easement/License Coordination (Optional)
Task II-6 Construction and Maintenance (C&M) Agreement
Task II-7 CPUC Application
Phase 3 90% Design
Task III-1 Address/Incorporate Comments and Prepare 90% Submittal
Phase 4 Final (100%) Design
Task IV Address/Incorporate Comments and Prepare Final
Submittal
Phase 5 Post Design
Task V-1 Bidding and Preconstruction Assistance
Task V-2 Design Support During Construction
Task V-3 As-Built Plans
First Amendment to Professional Services Agreement – JMD Compton Boulevard Street Improvement Project
Public Works/Resolution No. ______
3 2. The parties agree to amend Section 2 – Duration of Contract of the original Agreement to extend the term of the Agreement to provide that the Agreement shall terminate on exhaustion of the authorized maximum compensation of Nine Hundred Thirty Two Thousand Six Hundred Forty Four Dollars and Ninety Eight Cents ($932,644.98), unless otherwise extended or terminated.

3. The parties agree to amend Section 3 – Compensation of the original Agreement to provide additional compensation to Consultant for services rendered during the extended term of the original Agreement, as specified above, in the not-to-exceed amount of Nine Hundred Thirty Two Thousand Six Hundred Forty Four Dollars and Ninety Eight Cents ($932,644.98).

4. Except as provided for above, all other terms and conditions of the original Agreement and any amendments thereto between the City and the Contractor all remain in effect.

IN WITNESS WHEREOF, the authorized representatives of the parties have executed this FIRST AMENDMENT to the above-identified PROFESSIONAL SERVICES AGREEMENT.

JMD/CONSULTANT
Dated: _______________ By ___________________________________________ Juan M. Diaz, MBA, P.E., President
Approved by:

Dated: _______________ By ___________________________________________ Ronerick D. Simpson, City Manager
Approved as to form:

By _________________________________ Dated: ______________ Eric J. Perrodin, City Attorney
ATTEST:

Dated: ___________________ By _____________________________________ Alita Godwin, City Clerk