May 21, 2024

TO: MAYOR AND CITY COUNCIL MEMBERS
FROM: CITY MANAGER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

ORDERING THE LEVY AND COLLECTION OF ASSESSMENTS OF
THE SEWER SERVICE CHARGES FOR FISCAL YEAR 2024/2025

SUMMARY
This resolution will approve ordering the levy and collection of assessments of the Sewer Service Charges for fiscal year 2024/2025.

BACKGROUND
At the City Council meeting held on April 23, 2024, the City Council adopted resolutions Initiating Proceedings, Accepting the Preliminary Engineer’s Report, Declaring its Intent to Levy and Collect Assessments and Charges, and appoint a time and place for hearing protests for the Sewer Service Charge for fiscal year 2024/2025. The time for the hearing of protests was set for May 21, 2024 at 5:45 pm.

STATEMENT OF THE ISSUE
These funds are required to operate the sewer collection system in the City of Compton for fiscal year 2024/2025. The action of this meeting is to hold the noticed public hearing. The City Council receives public comment and makes any revisions deemed essential. Therefore, City Council authorization is necessary to order the levy and collection of assessments of the Sewer Service Charges for Fiscal Year 2024/2025.

FISCAL IMPACT
There is no impact to the General Fund. These assessments are collected for the City by the County Tax Collector, and usually nets the City of Compton approximately $913,506 annually. The fund will benefit the Sewer Enterprise Fund.

RECOMMENDATION
Staff recommends approval of the attached resolution.

JOHN D. STRICKLAND, JR.

DIRECTOR OF PUBLIC WORKS
APPROVED FOR FORWARDING:

WILLIE A. HOPKINS, JR.

CITY MANAGER

9. RESOLUTION NO._____________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

ORDERING THE LEVY AND COLLECTION OF ASSESSMENTS OF
THE SEWER SERVICE CHARGES FOR FISCAL YEAR 2023/2024
WHEREAS, the City Council of the City of Compton had by previous resolution initiated proceedings and declared its intention to levy and collect sewer service charges against lots and parcels of land within the City of Compton (hereinafter referred to as the “City”) for fiscal year 2023/2024; and
WHEREAS, the designated Assessment Engineer, Willdan Financial Services has prepared and filed with the City Clerk of the City of Compton and the City Clerk has presented to the City Council the Engineer’s Report (hereinafter referred to as the “Report”) in connection with the proposed levy and collection of sewer service charges upon eligible parcels of land within the City, and the City Council did by previous Resolution approve such Report; and
WHEREAS, the City Council desires to levy and collect service charges against parcels of land within the City for the fiscal year commencing July 1, 2023 and ending June 30, 2024, to pay the costs and expenses of operating, maintaining and servicing sewer facilities located within the City; and

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AND ORDER AS FOLLOWS:

SECTION 1. The above recitals are true and correct.

SECTION 2. Following notice duly given, the City Council has held a full and fair Public Hearing regarding its Resolution approving or amending the Report prepared in connection herewith; the levy and collection of service charges, and considered all oral and written statements, protests and communications made or filed by interested persons.

SECTION 3. Based upon its review (and amendments, as applicable) of the Report, a copy of which has been presented to the City Council and which has been filed with the City Clerk, the City Council hereby finds and determines that:
a) The land within the City will be benefited by the operation, maintenance and servicing of the sewer facilities within the boundaries of the City. b) The City includes all of the land receiving such benefit. c) The net amount to be charged upon the lands has been apportioned by a formula and method, which fairly distributes the net amount among chargeable parcels in proportion to the estimated benefit to be received by each parcel from the improvements and services for the fiscal year commencing July 1, 2023 and ending June 30, 2024.
d) The proposed charges for fiscal year 2023/2024 constitute a continuation of existing charges. That the charges are imposed exclusively to finance the maintenance, operation and servicing expenses for sewer facilities.

SECTION 4. The City Council hereby orders the proposed improvements to be made, which improvements are briefly described as the maintenance, operation, administration and servicing of the sanitary sewer system and repayment of a portion of the annual payment on the sewer bonds previously issued for the reconstruction of the sewer system and all appurtenant facilities related thereto.

RESOLUTION NO.____________
PAGE 2
SECTION 5. The County Auditor of Los Angeles County shall enter on the County Assessment Roll opposite each parcel of land the amount of levy, and such levies shall be collected at the same time and in the same manner as the County taxes are collected.

After collection by the County, the net amount of the levy shall be paid to the City Treasurer and placed in a special fund.

SECTION 6. The City Treasurer shall deposit all money representing charges collected by the County to the credit of a fund for the City of Compton Sewer Service Charge, and such money shall be expended only for the maintenance, operation and servicing of the improvements as described in the Report.

SECTION 7. The adoption of this Resolution constitutes the annual levy of the sewer service charge for the fiscal year commencing July 1, 2023 and ending June 30, 2024.

SECTION 8. The Assessment Engineer selected by the City Council is hereby authorized and directed to file a copy of the Resolutions and charges with the County Auditor of the County of Los Angeles no later than August 2023.

SECTION 9. Copies of this resolution shall be filed in the offices of the City Manager, City Controller, and Public Works Departments.

SECTION 10. The Mayor shall sign and the City Clerk shall attest to the adoption of this resolution.

ADOPTED this __________ day of ___________________, 2024. _______________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
___________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
CITY OF COMPTON: ss
I, Vernell McDaniel, City Clerk of the City of Compton, hereby certify that the foregoing resolution was adopted by the City Council of the City of Compton, signed by the Mayor, and attested by the City Clerk at a regular meeting thereof held on the ______ day of _________________, 2024.

That said resolution was adopted by the following vote, to wit:

AYES: COUNCIL MEMBERSNOES: COUNCIL MEMBERSABSTAIN: COUNCIL MEMBERSABSENT: COUNCIL MEMBERS- ___________________________________

CITY CLERK OF THE CITY OF COMPTON
May 21, 2024
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: CITY MANAGER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON AMENDING THE PUBLIC WORKS ENGINEERING DEPARTMENT’S
2023-2024 FISCAL YEAR BUDGET AND AUTHORIZING THE CITY

MANAGER TO ENTER INTO A SECOND AMENDMENT OF THE

PROFESSIONAL SERVICES AGREEMENT WITH AND ESTABLISH A
PURCHASE ORDER FOR BIGGS CARDOSA ASSOCIATES, INC.

STRUCTURAL ENGINEERS TO PROVIDE ADDITIONAL

PROFESSIONAL DESIGN ENGINEERING SERVICES FOR THE

ARTESIA BOULEVARD BRIDGE IN THE AMOUNT OF FORTY-NINE
THOUSAND FIVE HUNDRED EIGHTY-FOUR DOLLARS ($49,584.00)

SUMMARY
Adoption of this Resolution will amend the Public Works Engineering Department’s 2023- 2024 Fiscal Year budget. It will also authorize the City Manager to enter into a Second Amendment of the Professional Services Agreement with and establish a purchase order for Biggs Cardosa Associates, Inc. Structural Engineers (BCA) to provide additional professional design engineering services for the Artesia Boulevard Bridge in the amount of Forty-Nine Thousand Five Hundred Eighty-Four Dollars ($49,584.00).

BACKGROUND
The City of Compton is replacing a section of the Artesia Boulevard Bridge (State Bridge No.53C1744, Los Angeles County Bridge No. 2446), located approximately 600 feet west of Santa Fe Avenue within City limits. Specifically, the Project is located over Alameda Street and the Union Pacific Railroad and Alameda Corridor’s Right-of-Ways.

The primary focus of the Project was replacing the section of the bridge known as Span 10, initially presumed to be the sole area affected by the fire. This replacement was necessary due to the severe fire damage sustained to the bridge’s steel girders and supporting connections. The replacement will be an in-kind concept, using a steel superstructure with rolled steel girders.

On October 11, 2022, pursuant to Resolution No. 25,737, City Council authorized the City Manager to enter into a Professional Services Agreement with BCA to provide preliminary engineering services that consisted of the following: Coordination and Meetings, Project Administration, Environmental Documentation, Plans, Specifications and Estimates (PS&E), Technical Specifications Preparation, Cost Estimates, Structural Calculations,

10. Staff Report – Second Amendment of the Professional Services Agreement with BCA May 21, 2024

Page 2 ends

and an Independent Checks of the PS&E for the Artesia Boulevard Bridge in the amount of Two Hundred Seventy-One Thousand Eight Hundred Seventy-Eight Dollars ($271,878.00). All funds allocated pursuant to Resolution No. 25,737 have been exhausted.

On September 26, 2023, pursuant to Resolution No. 25,907, City Council authorized the City Manager to enter into a First Amendment to the Professional Services Agreement with BCA to provide additional design support services that consisted of the following:

Security Panel Re-Design, Engineering Support During Bidding and Construction, Construction Support, and As-Built Preparation in the amount of One Hundred TwentyFour Thousand Eight Hundred Twenty-Four Dollars ($124,824.00). All funds allocated pursuant to Resolution No. 25,907 have been exhausted.

On January 2, 2024, construction commenced to replace damaged portions of the Artesia Boulevard Bridge. Initially, the project focused solely on addressing the damage to Span

10. However, as work progressed, it became evident that Span 9 had also sustained significant fire-related damages, prompting the expansion of the project scope to encompass both spans.

STATEMENT OF ISSUE
On March 21, 2024, BCA submitted an updated proposal to encompass the additional work needed for Span 9. Specifically, BCA noted that the Resident Engineer detected that steel diaphragm framing and the concrete deck and haunch were deteriorated on the southern 75% of the existing Span 9, with deck and haunch deterioration extending up to 15’ to 20’ from the bent to the west.

The proposal submitted by BCA, proposed to evaluate the existing girders, make engineering calculations, provide sketches and direction to the Resident Engineer and Contractor for repair of the damage, meetings in the field, review shop drawings, respond to Request for Information (RFI’s), and produce as-built plan markups of the existing asbuilt plans, as well as any other required activities.

Additionally, the initial scope of work did not include coordination of utilities on and under the existing bridge, and when the construction notice was circulated the City was notified that a pipeline existed just east of Bent 10, and the concrete security panel wall would need to be replaced with a set of operable steel doors. So, to perform the necessary work, BCA will also need to design a detail custom steel doors with steel closure above the doors to replace the westernmost concrete panels in the original construction contract.

BCA proposed to provide these services on a time and materials basis for an additional amount of $49,584.00.

Therefore, in order to amend the Public Works Engineering Department’s 2023-2024 fiscal year budget and authorize the City Manager to enter into a Second Amendment of the Professional Services Agreement with and establish a purchase order for Biggs Cardosa Associates, Inc. Structural Engineers (BCA) to provide additional professional Staff Report – Second Amendment of the Professional Services Agreement with BCA May 21, 2024

Page 3 ends

design engineering services for the Artesia Boulevard Bridge in in the amount of FortyNine Thousand Five Hundred Eighty-Four Dollars ($49,584.00), City Council’s authorization is necessary.

ALTERNATIVE
There are no alternatives that are being recommended at this time. The progression and completion of the Project requires professional engineering services to be performed by BCA.

FISCAL IMPACT
The Public Works Engineering Department’s 2023-2024 Fiscal Year budget will be amended as follows:

Increase Revenue:

Account No. Description Amount
2789-710-041-3569 State Grants $49,584.00
Increase Expenditures:

Account No. Description Amount
2789-710-041-4300 State Grants/Capital Outlay $49,584.00 Funds in the amount of $49,584.00 will be made available in the Public Works Engineering Department’s 2023-2024 Fiscal Year budget in Account No. 2789-710-041- 4300.

RECOMMENDATION
Staff recommends the City Council adopt the attached Resolution.

JOHN D. STRICKLAND, JR.,

DIRECTOR OF PUBLIC WORKS
APPROVED FOR FORWARDING:

WILLIE A. HOPKINS, JR.,

CITY MANAGER
Staff Report – Second Amendment of the Professional Services Agreement with BCA May 21, 2024

Page 4 ends

RESOLUTION NO. ___________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON AMENDING THE PUBLIC WORKS ENGINEERING DEPARTMENT’S
2023-2024 FISCAL YEAR BUDGET AND AUTHORIZING THE CITY

MANAGER TO ENTER INTO A SECOND AMENDMENT OF THE

PROFESSIONAL SERVICES AGREEMENT WITH AND ESTABLISH A
PURCHASE ORDER FOR BIGGS CARDOSA ASSOCIATES, INC.

STRUCTURAL ENGINEERS TO PROVIDE ADDITIONAL

PROFESSIONAL DESIGN ENGINEERING SERVICES FOR THE

ARTESIA BOULEVARD BRIDGE IN THE AMOUNT OF FORTY-NINE
THOUSAND FIVE HUNDRED EIGHTY-FOUR DOLLARS ($49,584.00)
WHEREAS, this Resolution will amend the Public Works Engineering Department’s 2023-2024 Fiscal Year budget and authorize the City Manager to enter into a Second Amendment of the Professional Services Agreement with and establish a purchase order for Biggs Cardosa Associates, Inc. Structural Engineers (BCA) to provide additional professional design engineering services for the Artesia Boulevard Bridge in the amount of Forty-Nine Thousand Five Hundred Eighty-Four Dollars ($49,584.00); and WHEREAS, the City of Compton is replacing a section of the Artesia Boulevard Bridge (State Bridge No.53C1744, Los Angeles County Bridge No. 2446), located approximately 600 feet west of Santa Fe Avenue within City limits, specifically, the Project is located over Alameda Street and the Union Pacific Railroad and Alameda Corridor’s Right-of-Ways; and
WHEREAS, the primary focus of the Project was replacing the section of the bridge known as Span 10, initially presumed to be the sole area affected by the fire; and WHEREAS, the replacement was necessary due to the severe fire damage sustained to the bridge’s steel girders and supporting connections, and the replacement will be an in-kind concept, using a steel superstructure with rolled steel girders; and WHEREAS, on October 11, 2022, pursuant to Resolution No. 25,737, City Council authorized the City Manager to enter into a Professional Services Agreement with BCA to provide preliminary engineering services that consisted of the following: Coordination and Meetings, Project Administration, Environmental Documentation, Plans, Specifications and Estimates (PS&E), Technical Specifications Preparation, Cost Estimates, Structural Calculations, and Independent Checks of the PS&E for the Artesia Boulevard Bridge in the amount of Two Hundred Seventy-One Thousand Eight Hundred Seventy-Eight Dollars ($271,878.00); and
WHEREAS, on September 26, 2023, pursuant to Resolution No. 25,907, City Council authorized the City Manager to enter into a First Amendment to the Professional Services Agreement with BCA to provide additional design support services that consisted of the following: Security Panel Design, Engineering Support During Bidding RESOLUTION NO. ___________
PAGE 2
and Construction, Construction Support, and As-Built preparation in the amount of One Hundred Twenty-Four Thousand Eight Hundred Twenty-Four Dollars ($124,824.00); and WHEREAS, all funds allocated pursuant to Resolution No. 25,737 and Resolution No. 25,907 have been exhausted; and
WHEREAS, on January 2, 2024, construction commenced to replace damaged portions of the Artesia Boulevard Bridge, and initially, the project focused solely on addressing the damage to Span 10, and as work progressed, it became evident that Span 9 had also sustained significant fire-related damages, prompting the expansion of the project scope to encompass both spans; and
WHEREAS, on March 21, 2024, BCA submitted an updated proposal to encompass the additional work needed for Span 9, BCA noted that the Resident Engineer detected that steel diaphragm framing and the concrete deck and haunch were deteriorated on the southern 75% of the existing Span 9, with deck and haunch deterioration extending up to 15’ to 20’ from the bent to the west; and WHEREAS, the proposal submitted by BCA, proposed to evaluate the existing girders, make engineering calculations, provide sketches and direction to the Resident Engineer and Contractor for repair of the damage, meetings, review shop drawings, respond to Request for Information (RFI’s), and produce as-built plan markups of the existing as-built plans, as well as any other required activities; and WHEREAS, the initial scope of work did not include coordination of utilities on and under the existing bridge, and when the construction notice was circulated, the City was notified that a pipeline existed just east of Bent 10, and the concrete security panel wall would need to be replaced with a set of operable steel doors; and WHEREAS, to perform the necessary work, BCA will also need to design and detail custom steel doors with steel closure above the doors to replace the westernmost concrete panels in the original construction contract; and WHEREAS, BCA proposed to provide these services on a time and materials basis for an additional amount of $49,584.00; and
WHEREAS, the Public Works Engineering Department’s 2023-2024 Fiscal Year budget will be amended as follows:

Increase Revenue:

Account No. Description Amount
2789-710-041-3569 State Grants $49,584.00
RESOLUTION NO. ___________
PAGE 3
Increase Expenditures:

Account No. Description Amount
2789-710-041-4300 Capital Outlay $49,584.00; and
WHEREAS, funds in the amount of $49,584.00 will be made available in the Public Works Engineering Department’s 2023-2024 Fiscal Year budget in Account No. 2789- 710-041-4300.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. That the City Council authorizes the City Manager to execute all agreements and any amendments thereto with Biggs Cardosa Associates, Inc. Structural Engineers.

Section 2. That the City Manager, upon the advice of the City Attorney, is hereby authorized to enter into a Second Amendment of the Professional Services Agreement between the Biggs Cardosa Associates, Inc. Structural Engineers and the City of Compton.

Section 3. That the Public Works Engineering Department’s 2023-2024 Fiscal Year budget will be amended as follows:

Increase Revenue:

Account No. Description Amount
2789-710-041-3569 State Grants $49,584.00
Increase Expenditures:

Account No. Description Amount
2789-710-041-4300 State Grants $49,584.00
Section 4. That funds in the amount of $49,584.00 will be available in the Public Works Engineering Department’s 2023-2024 Fiscal Year in Account No. 2789-710-041- 4300.

Section 5. That a purchase order in the amount of $49,584.00, is authorized to be established for Biggs Cardosa Associates, Inc. Structural Engineers for additional services to be rendered on the Artesia Boulevard Bridge Repair Project, from Account No. 2789-710-041-4300.

Section 6. That a copy of this Resolution shall be filed in the offices of the City Manager, City Controller, City Clerk, City Attorney, and Public Works Engineering Department.

RESOLUTION NO. ___________
PAGE 4
Section 7. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this _______day of _____________, 2024.
_______________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
___________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF COMPTON )
I, Vernell McDaniel, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council, signed by the Mayor and attested by the City Clerk at a regular meeting thereof held this ______ day of ________________, 2024.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCIL MEMBERS –
NOES: COUNCIL MEMBERS –
ABSTAIN: COUNCIL MEMBERS –
ABSENT: COUNCIL MEMBERS –
___________________________________

CITY CLERK OF THE CITY OF COMPTON

SECOND AMENDMENT
TO

PROFESSIONAL SERVICES AGREEMENT

BETWEEN

CITY OF COMPTON
AND
BIGGS CARDOSA ASSOCIATES, INC.

This SECOND AMENDMENT to the Professional Services Agreement is made by and between the CITY OF COMPTON, a municipal corporation of the State of California (hereinafter referred to as “CITY”) and BIGGS CARDOSA ASSOCIATES, INC. (hereinafter referred to as “CONSULTANT”).

RECITALS:

WHEREAS, the City has a need to employ the services of an experienced and professional structural engineering consulting firm to provide professional design engineering services for the Artesia Boulevard Over Alameda Street and ACTA/UPRR Bridge Repair Project (CIP# 23-01); and
WHEREAS, on October 11, 2022, pursuant to Resolution No. 25,737, City Council authorized the City Manager to enter into a professional services agreement with and establish a purchase order for Biggs Cardosa Associates, Inc. Structural Engineers to provide professional design engineering services in the amount of $271,878; and WHEREAS, on May 31, 2023, Biggs Cardosa Associates, Inc. submitted a proposal requesting consideration of additional scope and fee for additional design and coordination support, and engineering support services during construction; and WHEREAS, the City has determined that it will be prudent to engage the services of a professional and experienced engineering firm to act as the City’s Engineer for this Project and be responsible to provide additional design and engineering services for the Artesia Boulevard Over Alameda Street and ACTA/UPRR Bridge Repair Project (CIP# 23-01), including design support services during construction; and
WHEREAS, by Resolution No. 25,907, adopted on the 26th day of September 2023, the City Council authorized the City Manager to enter into a First (1ST) Amendment to the professional services agreement with Consultant, which authorized an additional amount of $124,824.00; and WHEREAS, on January 2, 2024, construction commenced to replace damaged portions of the Artesia Boulevard Bridge, and as work progressed, it became evident that Span 9 had also sustained significant fire-related damages, prompting the expansion of the project scope to encompass both Span 9 & 10; and
WHEREAS, during ongoing construction activities, the Resident Engineer detected that the steel diaphragm framing and the concrete deck and haunch were deteriorated on the southern 75% of the existing Span 9, with deck and haunch deterioration extending up to 15’ to 20’ from the bent to the west; and
Second Amendment to Professional Services Agreement – Biggs Cardosa Associates, Inc.

Artesia Boulevard Over Alameda Street and ACTA/UPRR Bridge Repair Project (CIP# 23-01) Public Works/Resolution No.
2 WHEREAS, the initial scope of work did not include coordination of utilities on and under the existing bridge, and when the construction notice was circulated the City was notified that a pipeline existed just east of Bent 10, and the concrete security panel wall would need to be replaced with a set of operable steel doors; and
WHEREAS, on March 21, 2024, Biggs Cardosa Associates, Inc. submitted an updated proposal requesting consideration of additional scope and fee for additional design and coordination support, and engineering support services during construction related to the inclusion of Span 9; and
WHEREAS, there is a need to amend the original agreement to provide additional design support services for the second time during construction and provide additional compensation in the amount of $49,584.00; and
WHEREAS, by Resolution No.________, adopted on the ___
th day of May 2024, the
City Council authorized the City Manager to enter into a Second (2nd) Amendment to the professional services agreement with Consultant; and
WHEREAS, Consultant warrants that it is specifically trained, experienced, competent, and has the resources to provide such services which will be required by this project; and WHEREAS, Consultant is willing to render such professional services subject to the terms and conditions set forth in this Agreement.

NOW, THEREFORE, Consultant and City, for the consideration, terms and conditions herein described, do hereby mutually agree to amend the original Agreement as follows:

AMENDMENTS:

1. The parties agree to amend Section 1 – Services to be rendered by Consultant of the original Agreement to authorize the continued performance of the services specified within the original Agreement and expand the scope of services to include performance of the following services:

Span 9 Repair
Evaluate the existing girders, make engineering calculations, provide sketches and direction to the Resident Engineer and contractor for repair of the damage, meet in the field, review shop drawings, respond to RFI’s, and produce as-built plan markups of the existing as-built plans, as well as other required activities.

Deliverables:
 Site Meetings
 Design Calculations
 Memos, Sketches
 Shop Drawing/Submittal Reviews
 RFI Reponses
 As-Built Plans
 Coordination Meeting Attendance
Second Amendment to Professional Services Agreement – Biggs Cardosa Associates, Inc.

Artesia Boulevard Over Alameda Street and ACTA/UPRR Bridge Repair Project (CIP# 23-01) Public Works/Resolution No.
3 Steel Doors at Security Panels
Design and detail custom steel doors with steel closure above the doors, to replace the westernmost concrete panels in the original construction contract. Design of the steel doors and framing will be performed as well coordination with the utility owner, City, Resident Engineer and others.

Deliverables:
 Site Meetings
 Design Calculations
 Drawings
 Shop Drawing/Submittal Reviews
 RFI Responses
 As-Built Plans
 Coordination Meeting Attendance

2. The parties agree to amend Section 2 – Duration of Contract of the original Agreement to extend the term of the Agreement to provide that the Agreement shall terminate on exhaustion of the authorized maximum compensation of Forty-Nine Thousand Five Hundred Eighty-Four Dollars ($49,584.00), unless otherwise extended or terminated.

3. The parties agree to amend Section 3 – Compensation of the original Agreement to provide additional compensation to Consultant for services rendered during the extended term of the original Agreement, as specified above, in the not-to-exceed amount of FortyNine Thousand Five Hundred Eighty-Four Dollars ($49,584.00). Except as provided for above, all other terms and conditions of the original Agreement and any amendments thereto between the City and the Contractor all remain in effect.

IN WITNESS WHEREOF, the authorized representatives of the parties have executed this SECOND AMENDMENT to the above-identified PROFESSIONAL SERVICES AGREEMENT.

BIGGS CARDOSA ASSOCIATES, INC./CONSULTANT
Dated: _______________ By ___________________________________________ Eric Pheifer, Principal
Approved by:

Dated: _______________ By ___________________________________________ Willie A. Hopkins, Jr., City Manager
Second Amendment to Professional Services Agreement – Biggs Cardosa Associates, Inc.

Artesia Boulevard Over Alameda Street and ACTA/UPRR Bridge Repair Project (CIP# 23-01) Public Works/Resolution No.
4 Approved as to form:

By _________________________________ Dated: ______________ Eric J. Perrodin, City Attorney
ATTEST:

Dated: ___________________ By _____________________________________ Vernell McDaniel, City Clerk
March 21, 2024
City of Compton
Public Works Engineering Division
205 South Willowbrook Avenue
Compton, CA 90220
Attention: John Strickland, Project Manager
Amal Sedrak, PE, Acting City Engineer
Subject: Artesia Boulevard over Alameda/UPRR | Bridge Repair PS&E Extra Work Request 02
Dear Mr. Strickland and Ms. Sedrak:

Biggs Cardosa Associates, Inc. is submitting this Extra Work Request 02 for the Artesia Boulevard Overhead (State Bridge No. 53C1744, LA County Bridge No. 2446) to request consideration of additional scope and fee for additional design/coordination support, and engineering support during construction. Pursuant to Resolution No. 25,737 and the Professional Services Agreement, we are submitting this request for the City’s authorization and approval in writing.

Engineering Support During Construction
Unforeseeable issues have arisen during construction, which require attention from the design engineer, as further described below.

Span 9 Repair
BCA original scope of work included only the replacement of existing bridge Span 10. During demolition of existing Span 10, the Resident Engineer detected that steel diaphragm framing and the concrete deck and haunch were deteriorated on the southern 75% of the existing Span 9, with deck and haunch deterioration extending up to 15’ to 20’ from the bent to the west. On an emergency basis, Biggs Cardosa staff visited the site and met with LA County bridge inspection personnel and the RE, as well as with City staff.

BCA proposes to evaluated the existing girders, make engineering calculations, provide sketches and direction to the RE and contractor for repair of the damage, meet in the field and on the phone, review shop drawings, respond to RFI’s, and produce as-built plan markups of the existing as-built plans, as well as other required activities.

Deliverables:
 Site Meetings
 Design Calculations
Artesia Boulevard over Alameda/UPRR | Bridge Repair PS&E Extra Work Request 01

Page 2 ends

 Memos, Sketches
 Shop Drawing / Submittal Reviews
 RFI Responses
 As-Built Plans
 Coordination Meetings Attendance
Steel Doors at Security Panels
The original BCA scope was to perform structural engineering for replacement of Span 10. Our work did not include coordination of utilities on and under the existing bridge. When the construction notice was circulated, City was notified that a pipeline existed just east of Bent 10, and the concrete security panel wall would need to be replaced with a set of operable steel doors. To perform this work, BCA will need to design and detail custom steel doors with steel closure above the doors, to replace the westernmost concrete panels in the original construction contract. Design of the steel doors and framing will be performed as well coordination with the utility owner, City, RE and others.

Deliverables:
 Site Meetings
 Design Calculations
 Drawings
 Shop Drawing / Submittal Reviews
 RFI Responses
 As-Built Plans
 Coordination Meeting Attendance
Fee
We propose to provide the services outlined in this proposal on a time and materials basis for an additional not-to-exceed amount of $49,584. A detailed breakdown of our fee proposal is attached.

We look forward to continuing to work with you on this project. Should you have any questions, please do not hesitate to contact me.

Sincerely,

BIGGS CARDOSA
ASSOCIATES, INC.

Eric Pheifer, PE
Principal
Attachments:
 Fee Proposal
Artesia Boulevard Bridge | Extra Work Request 02 3/21/2024 Fee Proposal | Biggs Cardosa Associates
S.O.W. Phase / Task Principal Associate
Engineering
Manager
Senior
Engineer
Project
Engineer
Staff
Engineer
Assistant
Engineer
Junior
Engineer
$ 231.00 270.00 $ 200.00 $ 180.00 $ 165.00 $ 152.00 $ 139.00 $ 128.00 $ Engineering Support During Construction $ 49,368
Span 9 Repair $ 23,760
Site Meetings 16 0 16 3,696 $
Design Calculations 24 8 32 6,864 $
Memos, Sketches 16 4 20 4,356 $
Shop Drawing / Submittal Reviews 8 4 12 2,508 $
RFI Responses 4 4 8 1,584 $
As-Built Plans 4 8 12 2,244 $
Coordination meetings 8 4 12 2,508 $
Steel Doors at Security Panels 120 $ 25,608
Site Meetings 16 0 16 3,696 $
Design Calculations 24 8 32 6,864 $
Drawings 24 4 28 6,204 $
Shop Drawing / Submittal Reviews 8 8 16 3,168 $
RFI Responses 4 4 8 1,584 $
As-Built Plans 4 4 8 1,584 $
Coordination meetings 8 4 12 2,508 $
$ 49,368
$ 216
$ 216
Total Fee Extra Work Request 02 $ 49,584
Total
Hours
Labor
Subtotal
Subconsultant / Expenses
Labor Subtotal
Mileage (Site Visits During Construction)
Subconsultant / Expense Subtotal