February 4, 2025
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: CITY MANAGER
SUBJECT: A REQUEST TO SCHEDULE A JOINT PUBLIC HEARING – HOUSING AUTHORITY 2025 PHA ANNUAL PLAN AND 2025-
2029 ADMINISTRATIVE PLAN

SUMMARY
Staff is requesting a Joint Public hearing between the City Council and the Urban Community Development Commission for Tuesday, April 1, 2025 at 5:45 p.m.

DISCUSSION
The United States Department of Housing and Urban Development (HUD) requires all Public Housing Agency (PHA) to develop and implement an Annual Plan. The Annual Plan provides details about the PHA’s immediate operations, programs and services and notifies HUD of changes that were not included in the Five-Year Plan.

Likewise, HUD requires PHAs to update their Five-Year Administrative Plan every five years. Staff is currently updating the Five-Year Administrative Plan also.

The information that the PHA must submit to HUD under both, are the discretionary policies of the various plan components or elements (i.e., programs, operations, and strategies for meeting local housing needs and goals) and not the statutory or regulatory requirements that govern these components.

RECOMMENDATION
Staff respectfully requests a joint public hearing be scheduled for Tuesday, April 1, 2025, at 5:45 p.m. in the Council Chambers located at 205 South Willowbrook Avenue, Compton, California 90220.

CECIL FLOURNOY, EXECUTIVE DIRECTOR

COMPTON HOUSING AUTHORITY

COMMUNITY DEVELOPMENT DEPARTMENT
APPROVED FOR FORWARDING:

WILLIE HOPKINS JR.

CITY MANAGER
February 4, 2025
TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS
FROM: PUBLIC WORKS STREET MAINTENANCE DEPARTMENT
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ESTABLISH PURCHASE

ORDERS TO ONE OR MORE VENDORS (JANKOVICH, SC FUELS AND
WOOD OIL) FOR THE PURCHASE OF GASOLINE FOR THE CITY’S

FLEET IN AN AMOUNT NOT TO EXCEED TWO HUNDRED THOUSAND
DOLLARS ($200,000)

SUMMARY
The adoption of this resolution will authorize the City Manager to establish purchase orders to one or more vendors (Jankovich, SC Fuels and Wood Oil) for the purchase of gasoline for the City’s fleet in an amount not to exceed Two Hundred Thousand Dollars ($200,000).

BACKGROUND
The Fleet Operations Division is responsible for the management and leadership of the mechanics shop and other field personnel. The Fleet Maintenance Division works with departments to meet vehicle and equipment readiness requirements and performs maintenance/repairs of vehicles and equipment used by City personnel.

The Fleet Operations - Fuel Division is responsible for the acquisition of unleaded and diesel fuel for citywide use. The Fuel Division manages delivery of fuel to city sites and conducts daily fuel site inspections to meet local, state and federal reporting requirements and repairs, monitors and maintains fuel sites.

The price and availability of fuel has been unpredictable during previous fiscal years and has caused the Public Works Department to request the ability to purchase from multiple fuel vendors during the fiscal year. The Public Works Department is requesting the authority to obtain the lowest fuel prices per gallon from three (3) fuel providers:

Jankovich, SC Fuels and Wood Oil who all provide fuel service to commercial and local government fueling stations.

STATEMENT OF THE ISSUE
The Public Works Street Maintenance Department (Department) is responsible for providing regular and diesel fuel for the City’s fleet of vehicles and equipment. The Department is requesting the ability to purchase fuel for Fiscal Year 2024-2025 in an amount not to exceed Two Hundred Thousand Dollars ($200,000).

1. Staff Report – Resolution Authorizing P.O.

Various vendors for purchasing fuel
February 4, 2025, Page 2
The funding will be allocated to one or more of the following vendors:
 Jankovich
 SC Fuels
 Wood Oil
Staff solicited the following fuel quotes:

Company Name Red Diesel Fuel - Cents per 7600
gallons (Margin over OPIS Daily
Average)
87 Regular Fuel - Cents per 7600
gallons (Margin over OPIS Daily
Average)
Jankovich 0.0716 0.0700
SC Fuels 0.02 0.06
Wood Oil 0.18 0.18
OPIS (Oil Price Information Service) is a company providing pricing and news information for petroleum pricing, news and analysis for gasoline, diesel, ethanol, biodiesel, LP-gas, jet fuel, crude, natural gas, etc. (OPIS is the only provider of U.S. spot, rack and retail prices for petroleum supplier information).

FISCAL IMPACT
Funding in the amount of Two Hundred Thousand Dollars ($200,000) is available in the Department’s Fiscal Year 2024-2025 Budget in Account No. 6000-720-000-4228.

ALTERNATIVE
No other alternative is being proposed.

RECOMMENDATION
Staff recommends that the City Council approves the attached Resolution.

DAMION TIMMONS

STREET SUPERINTENDENT
APPROVED FOR FORWARDING:

WILLIE A HOPKINS, JR.

CITY MANAGER
RESOLUTION NO. ___________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ESTABLISH PURCHASE ORDERS

TO ONE OR MORE VENDORS (JANKOVICH, SC FUELS AND WOOD OIL) FOR THE PURCHASE OF GASOLINE FOR THE CITY’S FLEET IN AN

AMOUNT NOT TO EXCEED TWO HUNDRED THOUSAND DOLLARS
($200,000)
WHEREAS, this resolution will authorize the City Manager to establish purchase orders to one or more vendors (Jankovich, SC Fuels and Wood Oil) for the purchase of regular and diesel fuel for the City’s fleet in an amount not to exceed Two Hundred Thousand Dollars ($200,000); and
WHEREAS, the Public Works Street Maintenance Department (Department) – Fleet Operations Division is responsible for the acquisition of fuel for citywide use; and
WHEREAS, the Division manages delivery of fuel to city sites and conducts daily fuel site inspections to meet local, state and federal reporting requirements and repairs, monitors and maintains fuel sites; and
WHEREAS, the price and availability of fuel has been unpredictable during the previous fiscal years which has caused the Department to request the ability to purchase from multiple fuel vendors; and
WHEREAS, the Department is requesting the authority to obtain the lowest fuel costs from three (3) fuel providers: Jankovich, SC Fuels and Wood Oil; and WHEREAS, staff solicited the following fuel quotes from providers:

Company Name Red Diesel Fuel - Cents per 7600
gallons (Margin over OPIS Daily
Average)
87 Regular Fuel - Cents per 7600
gallons (Margin over OPIS Daily
Average)
Jankovich 0.0716 0.0700
SC Fuels 0.02 0.06
Wood Oil 0.18 0.18
WHEREAS, funding for this expenditure is available in the Department’s Fiscal Year 2024-2025 Budget in Account No. 6000-720-000-4228.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the City Manager is hereby authorized to establish purchase orders to one or more fuel vendors (Jankovich, SC Fuels and Wood Oil) to purchase regular and diesel fuel for the City’s fleet in an amount not to exceed Two Hundred Thousand Dollars ($200,000).

SECTION 2. That funding for this expenditure is available in the Department’s Fiscal Year 2024-2025 Budget in Account No. 6000-720-000-4228.

SECTION 3. That a copy of this Resolution shall be filed in the offices of the City Clerk, City Manager, City Controller, City Attorney and Public Works Street Maintenance Department.

SECTION 4. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this ______ day of _______________, 2025.

Resolution No. ______________

Page 2 ends

_______________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
___________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF COMPTON )
I, Satra D. Zurita, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council of the City of Compton, signed by the Mayor and attested by the City Clerk at a regular meeting thereof held on this ________ day of ____________________, 2025.

That said Resolution was adopted by the following vote to wit:

AYES: COUNCIL MEMBERSNOES: COUNCIL MEMBERSABSENT: COUNCIL MEMBERSABSTAIN: COUNCIL MEMBERS- ____________________________________

CITY CLERK OF THE CITY OF COMPTON

February 4, 2025
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: PUBLIC WORKS STREET MAINTENANCE DEPARTMENT
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

ACCEPTING THE PROPOSAL FROM NEW WEST LANDSCAPING FOR
COMPTON PAR 3 GOLF COURSE LANDSCAPE MAINTENANCE

SERVICES, TO AUTHORIZE THE CITY MANAGER TO ENTER INTO A ONE-YEAR SERVICE AGREEMENT WITH TWO (2) ONE-YEAR

EXTENSION OPTIONS AND TO ESTABLISH A PURCHASE ORDER IN

AN AMOUNT NOT TO EXCEED THIRTY THOUSAND NINE HUNDRED
SIXTY DOLLARS ($30,960.00)

SUMMARY
Adoption of this resolution will accept the proposal from New West Landscaping for Compton Par 3 Golf Course Landscape Maintenance Services, authorize the City Manager to enter into a one-year service agreement with two (2) one-year extension options and to establish a purchase order in an amount not to exceed Thirty Thousand Nine Hundred Sixty Dollars ($30,960.00).

BACKGROUND
The Compton Par 3 Golf Course, a City-owned facility located at 6400 E Compton Boulevard, spans approximately 12 acres. It features a 9-hole layout with a total length of 1,345 yards and a par of 27.

The landscape maintenance of the Compton Par 3 Golf Course is overseen by the Public Works Street Maintenance Department (Department), which is dedicated to keeping the course in excellent condition year-round. However, the Department is currently facing challenges in maintaining the course efficiently due to limited resources. Additional support is required on a weekly basis to complete essential tasks such as mowing, pruning, aeration, fertilizing and spraying.

STATEMENT OF THE ISSUE
The Compton Par 3 Golf Course is a vital recreational amenity. Regular maintenance is essential to preserve its condition, enhance user experience and ensure safety. The Department advertised a Request for Proposal for Compton Par 3 Golf Course Landscape Maintenance Services on September 4, 2024, through The Bulletin newspaper, Planet Bids and the City’s website.

As a result of the Request for Proposal, five (5) landscaping firms submitted their proposals by the stipulated deadline of September 19, 2024.

2. Staff Report – Compton Par 3 Golf Course Maintenance Services February 4, 2025, Page 2
Landscaping Firm Submitters

1. Swayzer Landscapes

2. BSI Sports Turf Management

3. K B Services

4. Four Seasons Landscaping

5. New West Landscaping
All five (5) landscaping firms:
 Submitted their proposals on time
 Submitted their bid price sheets
 Met some or all of the minimum requirements for landscape maintenance services Schedule of Compensation:

Swayzer Landscapes $408,000 / annually
BSI Sports Turf Management $184,104 / annually
K B Services $150,852 / annually
Four Seasons Landscaping $68,400 / annually
New West Landscaping $30,960 / annually
The Street Superintendent and staff carefully evaluated each proposal and conducted telephone interviews with the firms to assess staffing, equipment and services. After a thorough review, the panel determined that New West Landscaping is the lowest, most responsive and responsible bidder for providing landscape maintenance services at the Compton Par 3 Golf Course.

The selection of the most responsive and qualified firm was based on the completeness of the proposals, a demonstrated understanding of the scope of services, the quality of similar work previously completed, responsiveness to the RFP requirements and familiarity with the City and location.

RECOMMENDATION
Staff recommends the City Council accepts the bid submitted by New West Landscaping and authorize the City Manager to enter into a one-year service agreement with two (2) one-year options for extension and to establish a purchase order in the amount of Thirty Thousand Nine Hundred Sixty Dollars ($30,960) for Compton Par 3 Golf Course landscape maintenance services.

Staff Report – Compton Par 3 Golf Course Maintenance Services February 4, 2025, Page 3

FISCAL IMPACT
The Department has funds available in the Fiscal Year 2024-2025 Budget in the amount of Thirty Thousand Nine Hundred Sixty Dollars ($30,960) in Account No. 2502-720-000- 4266. Additionally, funds will be allocated in future fiscal year budgets for these services.

DAMION TIMMONS

STREET SUPERINTENDENT
APPROVED FOR FORWARDING:

WILLIE A HOPKINS, JR.

CITY MANAGER
RESOLUTION NO.____________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

ACCEPTING THE PROPOSAL FROM NEW WEST LANDSCAPE FOR
COMPTON PAR 3 GOLF COURSE LANDSCAPE MAINTENANCE SERVICES,

TO AUTHORIZE THE CITY MANAGER TO ENTER INTO A ONE-YEAR
SERVICE AGREEMENT WITH TWO (2) ONE-YEAR EXTENSION OPTIONS

AND TO ESTABLISH A PURCHASE ORDER IN AN AMOUNT NOT TO EXCEED THIRTY THOUSAND NINE HUNDRED SIXTY DOLLARS ($30,960.00) WHEREAS, the Compton Par 3 Golf Course is a City-owned facility located at 6400 E Compton Boulevard and spans approximately 12 acres. It features a 9-hole layout with a total length of 1,345 yards and a par of 27; and WHEREAS, the Public Works Street Maintenance Department (Department) oversees the landscape maintenance of the golf course. The Department is currently facing challenges in maintaining the course efficiently due to limited resources; and WHEREAS, additional support is required on a weekly basis to complete essential tasks such as mowing, pruning, aeration, fertilizing and spraying; and WHEREAS, the Department advertised a Request for Proposal for Compton Par 3 Golf Course Landscape Maintenance Services on September 4, 2024, through the Bulletin newspaper, Planet Bids and the City’s website; and WHEREAS, as a result of the Request for Proposal, five (5) landscaping firms submitted their proposals by the stipulated deadline of September 19, 2024:

Landscaping Firm Submitters

1. Swayzer Landscapes $408,000 / annually

2. BSI Sports Turf Management $184,104 / annually

3. K B Services $150,852 / annually

4. Four Seasons Landscaping $ 68,400 / annually

5. New West Landscaping $ 30,960 / annually
WHEREAS, the Street Superintendent and staff carefully evaluated each proposal. After a thorough review, the panel determined that New West Landscaping is the lowest, most responsive and responsible bidder for providing landscape maintenance services at the Compton Par 3 Golf Course; and
WHEREAS, the selection of the most responsive and qualified firm was based on the completeness of the proposals, a demonstrated understanding of the scope of services, the quality of similar work previously completed, responsiveness to the RFP requirements and familiarity with the City and location.

WHEREAS, funds for this expenditure are available in the Fiscal Year 2024-2025 Budget in account 2502-720-000-4266. Additionally, funds will be allocated in future fiscal year budgets for these services.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

Section 1. That the proposal from New West Landscaping is hereby accepted.

Section 2. That the City Manager is hereby authorized to enter into a one-year service contract (i.e. March 1, 2025 – February 28, 2026) with two (2) one-year extension options for New West Landscaping for providing landscape maintenance services for the Compton Par 3 Golf Course.

Section 3. That a purchase order is authorized to be established for New West Landscaping in an amount not to exceed Thirty Thousand Nine Hundred Sixty Dollars ($30,960).

Resolution No.__________

Page 2 ends

Section 4. That funds for this expenditure are available in the Fiscal Year 2024- 2025 Budget in Account No. 2502-720-000-4266. Additionally, funds will be allocated in future fiscal year budgets for these services.

Section 5. That a copy of this Resolution shall be filed in the offices of the City Clerk, City Attorney, City Manager, City Controller, and Public Works Street Maintenance Department.

Section 6. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this ______ day of _____________, 2025.
____

MAYOR OF THE CITY OF COMPTON
ATTEST:
___________________________________

CITY CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF COMPTON )
I, Satra D. Zurita, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council of the City of Compton, signed by the Mayor and attested by the City Clerk at a regular meeting thereof held on this _____ day of ________________, 2025.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCILMEMBERSNOES: COUNCILMEMBERSABSTAIN: COUNCILMEMBERSABSENT: COUNCILMEMBERS- _________ _______________

CITY CLERK OF THE CITY OF COMPTON

SERVICES AGREEMENT

BETWEEN

CITY OF COMPTON
AND

NEW WEST LANDSCAPING
This AGREEMENT is made by and between the CITY OF COMPTON, a municipal corporation of the State of California (hereinafter referred to as “CITY”) located at 205 South Willowbrook Avenue, Compton, California 90220, and NEW WEST LANDSCAPING (hereinafter referred to as “CONTRACTOR”) located at 1301 W Brazil Street, Compton CA 90220.

RECITALS:

A. City is a municipal corporation duly organized and validly existing under the law of the State of California with the power to carry on its business as it is now being conducted under the statutes of the State of California and the Charter of City.

B. Contractor is a firm duly organized and in good standing in the State of California.

Contractor represents that it is duly licensed by the State of California and has the background, knowledge, experience and expertise to perform the obligations set forth in this Agreement.

C. City and Contractor enter into this Agreement for the purpose of retaining New West Landscaping (Contractor) to perform that work required pursuant to the Agreement herein.

D. Authorization to enter into this Agreement is pursuant to (Resolution No.) adopted by the City Council on (Date).

AGREEMENT:

That the City and Contractor, for the consideration, terms and conditions herein described, mutually agree as follows:

1. SCOPE OF SERVICES TO BE PROVIDED:

The minimum services primarily consist of all tasks necessary for providing all maintenance, supplies, equipment and staff to perform all normal functions required to maintain quality conditions, including but not limited to greens mowing, cup changing, moving tee markers, grooming, maintaining quality turf grass, fertilizing, spraying, aerification, seeding, mowing and purchasing materials and supplies to maintain the Compton Par 3 Golf Course in the highest possible standard.

Performance Guidelines
A. The selected contractor agrees to perform all maintenance work as designated by the Public Works Street Superintendent.

B. The contractor will be required to perform and complete the services in a thorough and workmanlike manner and must furnish and provide all necessary labor, tools, implements, equipment, materials and supplies. All work specified in this Agreement shall be done by qualified and trained personnel. All of the contractors’ personnel shall wear uniforms with the company name and logo clearly printed on them. The contractor shall always have competent qualified supervision present on the job that work is being performed. The contractor and his/her employees shall conduct themselves in a proper, efficient and courteous manner at all times and shall cause Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
2 the least possible annoyance to the public.

C. At the end of each working day the contractor shall clean the worksite and all grounds and remove all rubbish and debris. All areas maintained during each workday shall be left in a neat, orderly and presentable condition.

D. All work performed shall be subject to the direct supervision of the Public Works Street Superintendent, or a duly appointed representative, and in all respects shall meet with their approval as conforming with the provisions and requirements prescribed thereof.

E. The Street Superintendent or a duly appointed representative will make periodic inspections of all maintenance work performed by the contractor. If the work has not been properly performed in accordance with all terms of the specifications and contract, the contractor will receive notification from the Street Superintendent regarding work performance deficiencies.

F. The contractor will supply picture documentation, at no cost to the City, digital quality pictures depicting “before and after” conditions when requested by the Street Superintendent or a duly appointed representative.

G. Should any direct or indirect damage or injury result to any public or private property by or on account of any act, omission, neglect or misconduct in the execution of the work or as a consequence of the non-execution thereof, on the part of the contractor or any of their employees or agents, such property shall be restored, by and at the expense of the contractor, to a condition equivalent to that existing before the damage or injury occurred, by repairing or rebuilding the same, or by otherwise making good such damage or injury, in an acceptable manner, determined by the Street Superintendent.

H. The contractor shall obtain all required permits and follow all local, state and federal regulations.

I. The City reserves the right, at its discretion, to perform maintenance services with its own employees or another contractor during the term of the contract.

Emergency Response Service
A. The contractor shall be required to provide emergency on call response services.

Emergency work shall begin within two (2) hours of the initial notification.

B. The contractor shall be required to provide 24-hour emergency phone numbers and names of at least two (2) contact persons. Should the contact persons or their phone numbers change during the course of the contract, those changes shall be submitted to the City within two (2) working days.

Minimum Specifications and Related Maintenance
A. All greens, fairways and roughs shall be mowed a minimum of one (1) time a week (four (4) times a month).

B. Maintain the edges of all turf areas and walkways, trimming around hazards and trees.

C. Apply fertilizers and soil amendments as needed to maintain healthy turf.

D. Periodic aeration of greens, fairways and tees.

E. Monitor and adjust irrigation systems to ensure proper watering. Perform routine Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
3 maintenance and repairs on irrigation components.

F. All greens will receive preventative spraying of herbicides and insecticides as needed.

G. Damaged or bare areas shall be properly prepared and re-seeded or new sod shall be applied as directed by the City.

H. Pruning, shaping and maintenance of trees and shrubs.

I. Planter areas and flower beds will be properly cultivated as needed and will be kept free of weeds, trimmings and other debris.

J. Ensure drainage systems are clear and functioning properly.

K. Control and eradicate rodents and other animal pests as necessary to prevent hazards, holes and destruction of grounds.

L. The contractor shall remove and responsibly dispose of all waste from the work performed.

Contractor will be responsible for the professional quality, technical accuracy and coordination of the services. Contractor will, without additional compensation, correct or revise and errors or deficiencies in the services.

Contractor agrees to perform all the said work and furnish all the said materials at its own cost and expense, as are necessary to complete in a good worker-like and substantial manner and to the satisfaction of the City.

1.1 Key Personnel.
.a Contractor’s Representative. Contractor hereby designates Keith Dickerson, Sole Proprietor, who shall be deemed to be Contractor’s agent with express authority to bind Contractor with respect to all matters requiring Contractor’s approval or authorization.
.b City’s Representative. City hereby designates the Street Superintendent or his/her designated representative as City’s Representative for this Agreement.

2. COMPENSATION:

The method of payment for the services rendered pursuant to this Agreement shall be base at the unit price rates specified within the Contractor’s Proposal, which is incorporated herein. It is understood and agreed between the parties that the maximum compensation payable for the services to be provided by the Contractor during each contract year of this Agreement shall be limited to a not-to-exceed amount of Thirty Thousand Nine Hundred Sixty Dollars ($30,960.00).

The total sum paid to the Contractor will include compensation for all work, including travel, materials, supplies, vendor services, expenses and subcontracted work. No additional compensation will be paid to the Contractor, unless there is a change in the scope of the services or the scope of the project. In the instance of a change in the scope of services or scope of the project, adjustment to the compensation may be negotiated between the Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
4 Contractor and the City. Adjustment in the compensation will not be effective until authorized and approved by contract amendment.

Progress payments may be made in arrears based on the percentage of work and deliverables completed by the Contractor. If Contractor fails to perform the required services according to schedule or other provisions of this Agreement, the City shall have the right to delay payment and/or terminate this Agreement in accordance with the provisions noted herein.

Contractor shall be reimbursed within thirty (30) days, or as promptly as fiscal procedures may permit, upon receipt by the City of itemized and detailed invoices for services completed. Invoices shall be submitted no later than 45 calendar days after the performance of work for which the Contractor is billing. Invoices shall be delivered or mailed to the Street Superintendent, Public Works Street Maintenance Department at the following address: City of Compton, 205 South Willowbrook Avenue, Compton, California 90220.

The Contractor is required to comply with all federal, state and local laws and ordinances applicable to the work.

In the event of termination, the Contractor shall be entitled to compensation for the undisputed reasonable value of services performed to the effective date of termination; provided, however, that the City may condition payment of such compensation upon the Contractor’s delivery to the City of any and all City property, documents, reports, records, materials and work product associated with the performance of this Agreement.

3. TERM OF AGREEMENT:

The term of this Agreement shall be for one (1) year (March 1, 2025 – February 28, 2026) with two (2) one-year extension options, unless the Agreement is extended or terminated as provided herein.

4. SAFETY:

4.1 Contractor shall have overall responsibility for safety precautions and programs in the performance of the services.

4.1 Contractor shall seek to avoid injury, loss or damage to persons or property by taking reasonable steps to protect:
.a Employees and all other persons at the location where services are rendered (“Site”);
.b Materials and equipment on the Site or off the Site at locations for use in performance of the work; and
.c The assigned project Site and all property located at the Site, whether or not said property or structures are part of the project or involved in the work.

Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
5 4.2 Contractor shall designate an individual at the Site of the assigned project in the employ of Contractor who shall act as Contractor’s designated safety representative with a duty to prevent accidents.

4.3 Losses not insured under property insurance which may arise from the performance of the work, to the extent of the negligence attributed to such acts or omissions of Contractor or anyone for whose acts Contractor may be liable, shall be promptly remedied by Contractor at Contractor’s cost and without reimbursement by City as a cost of work, or in any other manner.

4.4 If City deems any part of the work or Site unsafe, City may require Contractor, without assuming responsibility for Contractor’s safety program, to immediately stop performance of the work or take corrective measures. Neither City’s order nor Contractor’s action in response thereto shall be the basis for adjustment in the contract price or contract time.

5. INDEMNITY:

Contractor shall indemnify and save harmless the City, its officials, officers, employees, agents and volunteers (collectively hereafter the CITY) against any and all damages to property or injuries to or death of any person or persons, including property and employees or agents of the City and shall defend, indemnify and save the City from any and all liability or expense, including defense costs and legal fees, and claims, demands, suits, actions or proceedings of any kind or nature, including Worker’s Compensation claims, of or by anyone whomsoever in any way resulting from or arising out of the negligent or intentional acts or omissions of the Contractor in the performance of this Contract, including operations of subcontractors and acts or omissions of employers or agents of the Contractor or its subcontractors.

This indemnification and hold harmless obligation do not extend to claims arising out of the sole negligence or willful misconduct of the City.

6. INSURANCE:

6.1 Contractor, by executing this Agreement, hereby certifies:
(1) “I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for Worker’s Compensation or to undertake selfinsurance in accordance with the provisions of that Code and I will comply with such provisions before commencing the performance of the work of this Contract.” (2) Contractor further agrees to require all subcontractors to carry Worker’s Compensation Insurance as required by the Labor Code of the State of California.

6.2 Without limiting Contractor’s indemnification of the City, Contractor shall provide and maintain at its own expense during the term of this Agreement the following program(s) of insurance covering its operations hereunder. Evidence of such insurance, which Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
6 shall be provided by insurer(s) satisfactory to the City’s Risk Manager, shall be delivered to the City. Such evidence shall express conditions that the City is to be given written notice at least thirty (30) days in advance of any termination or implementation of a reduction of limits or material change of insurance coverage as specified herein, including at least ten (10) day notice of any non-payment of premium(s). Failure on the part of the Contractor to procure or maintain insurance shall constitute a material breach upon which the CITY may immediately terminate this Agreement.

All insurance required hereunder shall be primary with respect to any insurance maintained by the City and shall not call on the City’s program for contributions. Program(s) of insurance shall include:

1. General Liability. Contractor shall provide and maintain at its own expense during the term of this Agreement a policy of Commercial General Liability Insurance, inclusive of personal injury liability and broad form property damage coverage, in an amount not less than One Million Dollars ($1,000,000.00) per occurrence. The coverage shall be written on an occurrence basis. Claims made coverage is not acceptable.

2. Workers’ Compensation Insurance. Contractor shall provide and maintain at its own expense during the term of this Agreement a program of Workers’ Compensation Insurance and Employer’s Liability Insurance in an amount and form to meet all applicable requirements of the State Labor Code and which specifically covers all persons providing services by or on behalf of the Contractor and all risks to such persons under the Agreement.

3. Automotive Liability. A program of insurance with a limit of liability of not less than One Million Dollars ($1,000,000.00) for each accident. Such insurance shall include coverage for all “owned”, “hired” and “non-owned” vehicles, or coverage for “any auto”.

4. Insurance Endorsements. The liability insurance policy(ies) shall be endorsed with the following language:
. a The City of Compton and its respective elected and appointed officers, officials, employees, agents and volunteers are to be named and covered as “additional insureds” with respect to liability arising out of the activities of the Contractor. . b The insurer waives all rights of subrogation against the City. .c Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City.
. d Identity of the insured(s).

Insurance coverage specified herein constitutes the minimum requirements and said requirements shall in no way lessen or limit the liability of the Contractor under the terms of the Agreement. The Contractor is advised that the City does not carry Contractor’s Risk insurance, and the Contractor shall obtain its own coverage. Contractor shall procure and maintain, at its own costs and expense, any additional kinds and amounts of insurance that, in its own Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
7 judgment, may be necessary for its proper protection of the work. Contractor shall ensure any and all contracts with its Trade Contractors performing services under this Agreement meet the insurance requirements of this Agreement.

6.3 Waiver of Subrogation. Required insurance coverages shall not prohibit Contractor from waiving the right of subrogation prior to a loss. Contractor shall waive all subrogation rights against the indemnified parties. Policies shall contain or be endorsed to contain such provisions.

6.4 Deductible. Any deductible or self-insured retention must be approved in writing by the City and shall protect the indemnified parties in the same manner and to the same extent as they would have been protected had the policy or policies not contained a deductible or self-insured retention.

6.5 Evidence of Insurance. The Contractor, concurrently with the execution of the Contract, and as a condition precedent to the effectiveness thereof, shall deliver certified copies of the required policies to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf. At least fifteen (15) days prior to the expiration of any such policy, evidence of insurance showing that such insurance coverage has been renewed or extended shall be filed with the City. If such coverage is cancelled or reduced, Contractor shall, within ten (10) days after receipt of written notice of such cancellation or reduction of coverage, file with the City evidence of insurance showing that the required insurance has been reinstated or has been provided through another insurance company or companies.

6.6 Acceptability of Insurers. Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A:VII and authorized to do business in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.

6.7 Insurance for Subcontractors. All subcontractors shall be included as additional insured’s under the Contractor’s policies, or the Contractor shall be responsible for causing subcontractors to purchase the appropriate insurance in compliance with the terms of these Insurance Requirements, including adding the City as an “additional insured” to the subcontractor's policies.

7. NONDISCRIMINATORY EMPLOYMENT PRACTICES:

During the performance of this Contract, the Contractor agrees not to discriminate against any employee or applicant for employment because of race, sex, creed, color, religion, age, sexual orientation, marital status, national origin, political affiliation, handicap or belief in accordance with requirements of City, State or Federal laws and regulations. The Contractor will take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, sex, creed, color, religion, age, sexual orientation, marital status, national origin, political affiliation, handicap or belief. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoffs or termination; rates of pay or other forms of Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
8 compensation and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth provisions of this nondiscrimination clause.

In the event of the Contractor’s noncompliance with the nondiscrimination clauses of this Contract, this Contract may be canceled, terminated or suspended in whole or in part.

8. SUCCESSOR AND ASSIGNS:

City and the Contractor each binds themselves, their partners, successors, assigns and legal representatives to the other party hereto and to partners, successors, assigns and legal representatives of such other party in respect to all covenants, agreements and obligations contained in the Contract Documents. Neither party to the Agreement shall assign the Contract or sublet it in whole or part without the written consent of the other, nor shall the Contractor assign any monies due or to become due to it hereunder, without the previous written consent of the City. Any attempted assignment of this Contract without the written consent of both parties is void.

9. INDEPENDENT CONTRACTOR STATUS:

Contractor, its officers, employees, subcontractors, agents and volunteers (collectively hereinafter the CONTRACTOR), is a wholly independent Contractor and not an officer, employee, subcontractor or agent of the City. Neither the City nor any of its officers, employees, agents or volunteers shall have any control over the conduct of the Contractor, except as expressly set forth in this Agreement. Contractor expressly warrants that while engaged in carrying out and complying with any terms and conditions of this Agreement that Contractor shall not at any time or in any manner, represent that Contractor is in any manner officers, employees, agents or volunteers of the City. Contractor shall obtain no rights to retirement, health care or any other benefit that accrue to City officials, officers, or employees.

Contractor expressly waives any claim to such rights.

10. SUBCONTRACTING:

Except as may be agreed to by the City, Contractor will not subcontract any portion of the services without prior written approval of City Manager or his/her designee. If Contractor subcontracts any of the services, Contractor will be fully responsible to City for the acts, errors and omissions of Contractor's subcontractor and of the persons either directly or indirectly employed by the subcontractor, as Contractor is for the acts and omissions of persons directly employed by Contractor. Nothing contained in this Agreement will create any contractual relationship between any subcontractor of Contractor and City. Contractor will be responsible for payment of subcontractors. Contractor will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to Contractor's work unless specifically noted to the contrary in the subcontract and approved in writing by City.

11. OTHER CONTRACTORS:

The City reserves the right to employ other Contractors in connection with the services.

Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
9 12. PERMITS AND LICENSES:

Contractor, at its sole expense, shall obtain and maintain during the term of this Agreement, all appropriate business and professional permits, licenses and certificates that may be required in connection with the performance of services by Contractor.

Prior to or at the time of execution of this Agreement, the Contractor shall purchase a business license permit in conformance with Section 9-1.2 of the Compton Municipal Code.

13. TERMINATION:

Notwithstanding any other provisions of this Agreement, this Agreement may be terminated as follows:

13.1 If the Contractor becomes insolvent; that is, it has ceased to pay its debts in the ordinary course of business or cannot pay its debts as they become due, whether or not it has committed an act of bankruptcy, and whether or not insolvent within the meaning of the federal Bankruptcy law, then, the City may, without prejudice to any other right or remedy and after giving the Contractor five (5) days written notice, terminate this Agreement.

13.2 If the Contractor persistently or repeatedly refuses or fails, except in cases for which extensions of time are provided, to supply enough properly skilled workers, property or material, or if he fails to make prompt payment to subcontractors or for materials or labor, or he persistently disregards laws, ordinances, rules, regulations or orders of any public authority having jurisdiction, then, the City may, without prejudice to any other right or remedy and after giving the Contractor five (5) days written notice, terminate this Agreement.

13.3 If the Contractor fails to perform or breaches any material obligation under this Agreement, then, the City may, without prejudice to any other right or remedy and after giving the Contractor five (5) days written notice, terminate this Agreement.

If the City gives notice of termination, Contractor shall cease immediately all work in progress unless otherwise directed in writing by the City. Upon termination, Contractor shall furnish to the City a final invoice for work performed.

14. FORCE MAJEURE:

In the event that performance by either party is rendered impossible (permanently or temporarily) due to acts of war, acts of terrorism, fires, floods, epidemics, quarantine restrictions, or other natural occurrences, strikes, work slowdowns, lockouts (other than lockout by Contractor or any of Contractor’s subcontractors), or other similar acts to those described above or other causes beyond the reasonable control of such party, and without fault or negligence, said event shall excuse performance by such party, or in the case of temporary impossibility, shall excuse performance only for a period commensurate with the period of impossibility. Notwithstanding the foregoing, City shall have the right to terminate this Contract upon any event that renders performance impossible. In such case, City shall be responsible Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
10 for payment of all expenses incurred to the point at which this Contract is terminated.

15. WAIVERS:

A waiver by either party to this Agreement of any breach of any term, covenant or condition contained herein shall not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant or condition contained herein, whether of the same or a different character.

16. AMENDMENTS:

This Agreement may be modified or amended only by written document executed by both Contractor and City’s City Manager and approved as to form by the City Attorney. Such document shall expressly state that it is intended by the parties to amend the terms and conditions of this Agreement.

17. NOTICE:

All notices, demands or requests to be given under this Agreement shall be given in writing and conclusively shall be deemed received when: (a) delivered personally, or (b) on the fifth day after the deposit thereof in the United States mail, postage prepaid and addressed as hereinafter provided, or (c) one business day after sent by facsimile transmission.

Contractor: New West Landscaping
1301 West Brazil Street
Compton, California 90220
Attn: Keith Dickerson, Owner
(310) 617-9667
[email protected]
City: City of Compton
205 South Willowbrook Avenue
Compton, California 90220
Attn: Damion Timmons, Public Works Street
Superintendent
(310) 605-5691
[email protected]

18. CONTRACTOR’S BOOKS AND RECORDS:

Contractor shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to work, services, expenditures and disbursements charges to the City for the period and to the extent required by laws relating to audits of public agencies and their expenditures.

Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
11 Contractor shall maintain all documents and records which demonstrate performance under this Agreement for the period and to the extent required by laws relating to audits of public agencies and their expenditures.

Any records or documents required to be maintained pursuant to this Agreement shall be made available for inspection or audit, at any time during regular business hours, upon written request by the City or a designated representative. Copies of such documents shall be provided to the City, at its expenses, for inspection when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records shall be available at Contractor’s address indicated for receipt of notices in this Agreement.

19. EXAMINATION AND AUDIT:

This Contract shall be subject to examination and audit of the City, State Auditor of the State of California and/or any duly authorized representative of the federal government, at the request of the City, or as part of any audit of the City, for a period of three (3) years, or longer if required by law, after final payment under this Agreement.

20. EXTENT OF AGREEMENT:

This Agreement constitutes the entire understanding and agreement of the parties. This Agreement integrates all of the terms and conditions mentioned herein or incidental hereto and supersedes all negotiations or previous agreements between the parties with respect to all and any part of the subject matter hereof. Nothing contained in this Agreement shall create any contractual relations between any subcontractor and the City.

Incorporated herein and made a part hereof are the CITY’s “Request for Proposal for Compton Par 3 Golf Course Landscape Maintenance Services for the City of Compton” and the CONTRACTOR’s Proposal for “Compton Par 3 Golf Course Landscape Maintenance Services” (dated September 14, 2024).

21. GOVERNING LAW, JURISDICTION AND VENUE:

This Agreement shall be governed by and construed under the laws of the State of California. In the event of litigation between the parties, venue shall lie exclusively in a court of competent jurisdiction in the County of Los Angeles, state of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county.

Should any part of this Agreement be declared by a final decision by a court or tribunal of competent jurisdiction to be unconstitutional, invalid, or beyond the authority of either party to enter into or carry out, such decision shall not affect the validity of the remainder of this Agreement, which shall continue in full force and effect, provided that the remainder of this Agreement, absent the unexcised portion, can be reasonably interpreted to give effect to the intentions of the parties.

22. WAIVER OF JURY TRIAL:

Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
12 Contractor voluntarily waives its right to a jury trial of any cause of action, claim, counterclaim or cross-complaint in any action, proceeding or hearing on any matter whatsoever arising out of, or in any way connected with, this Agreement, the relationship between City and Contractor, Contractor’s performance on each project, or the enforcement of any remedy under any law, statute or regulation now or hereafter in effect. Contractor shall include this provision for waiver of jury trial right in its contracts with its subcontractors who provide work on any assigned projects, waiving the right of a jury trial in any action involving City as a party, whether by joinder, consolidation, counter-claim, cross-complaint or otherwise.

23. FEDERAL AND STATE WITHHOLDING TAXES:

Contractor shall be responsible for paying when due all federal and state income withholding taxes for all earning under this Agreement. Contractor agrees to indemnify City for any claims, costs, losses, fees, penalties, interest, or damages suffered by City resulting from Contractor’s failure to comply with this provision. Contractor shall be responsible for paying all federal and state income withholding taxes for all earning under this Agreement.

24. CERTIFICATIONS:

CERTIFICATIONS OF CONTRACTOR
I, Keith Dickerson, HEREBY CERTIFY that I am the Owner, and duly authorized representative of the CONTRACTOR firm of NEW WEST LANDSCAPING, and that, except as hereby expressly stated, neither I nor the above firm that I represent have:
.a employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above consultant) to solicit or secure this agreement; nor .b agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out the agreement; nor .c paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above consultant) any fee, contribution, donation, or consideration of any kind, for or in connection with, procuring or carrying out this agreement.

DEBARMENT AND SUSPENSION CERTIFICATION
The Contractor, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:
 is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal, State or local agency; and  has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal, State or local agency within the past 3 years; and  does not have a proposed debarment pending; and
 has not been indicted, convicted, or had a civil judgment rendered against he/she/it by a Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
13 court of competent jurisdiction in any matter involving fraud or official misconduct in connection with obtaining, attempting to obtain, or performing a public (Federal, state or local) transaction or contract under a public transaction; violation of Federal or state antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property within the past 3 years; and
 are not presently indicted or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in the preceding paragraph; and
 have not had one or more public transactions (Federal, State or local) terminated for cause or default within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space. [Supply exceptions on separate page]
For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.
[Attach separate page]
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction.

The above certifications are part of this contract. Signing this agreement on the signature portion thereof shall also constitute signature of the above Certifications. ___________________________________________ ___________________ Keith Dickerson, Owner Date

25. MISCELLANEOUS:

No provision of this Agreement is to be interpreted for or against either party because that party or that party’s legal representative drafted such provision.

Should either party hereto, or any representative, successor or assign of either party hereto, resort to litigation to enforce the provisions of this Agreement, the party or parties prevailing in such litigation shall be entitled, in addition to such other relief as may be granted, to recover its or their reasonable attorney’s fees and costs in such litigation from the party or parties against whom enforcement is sought.

IN WITNESS WHEREOF, Contractor has executed this Agreement and the City, by its City Manager, who is authorized to do so, has executed this Agreement.

Services Agreement – New West Landscaping
Compton Par 3 Golf Course Landscaping Maintenance Services Resolution No. _________
14 NEW WEST LANDSCAPING

CONTRACTOR
Dated: ________________ By _____________________________ Keith Dickerson, Owner

CITY OF COMPTON
Recommended for Approval:

By __________________________________ Dated: _____________________ Damion Timmons, Street Superintendent
Public Works Street Maintenance
Department
Approved by:

Dated: __________________ By______________________________________ Willie A Hopkins, Jr., City Manager
Approved as to form:

By __________________________________ Dated: _____________________ Eric Perrodin, City Attorney
ATTEST:

Dated: ___________________ By _____________________________________ Satra Zurita, City Clerk

February 4, 2025
TO: MAYOR AND CITY COUNCIL MEMBERS
FROM: CITY CONTROLLER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

COMPTON AUTHORIZING THE CITY MANAGER TO ISSUE A

PURCHASE ORDER OF SEVENTY-FOUR THOUSAND FIVE-HUNDRED
NINETY-THREE DOLLARS ($74,593) FOR EADIE AND PAYNE’S

INVOICES FOR PROVIDING NEEDED SERVICES BEYOND THE TERMS OF THE AGREEMENT.

SUMMARY
Staff is requesting that the City Council consider adopting a Resolution authorizing the City Manager to issue a Purchase Order for Seventy-Four Thousand Five-Hundred Ninety-Three Dollars ($74,593) for invoices received from Eadie and Payne LLC. for providing needed services for the City beyond the terms of the agreement.

BACKGROUND
In accordance to Section 1419 of the Compton City Charter, the employment of a qualified accountant at the beginning of each fiscal year, who shall examine the books, records, inventories and reports of all officers and employees who receive, handle or disburse public funds and of such other officers, employees and departments as the City Council may direct, is to be completed.

In June 2023, Resolution No. 25,856 authorized the City Manager to accept the proposal of the Independent Auditor, Eadie and Payne LLC., and enter into a contract to provide the necessary services. (Please see Attachment A for the Professional Services Agreement notating the services to be provided.)

STATEMENT OF ISSUE
During the FY2021-2022 audit process, additional time and services beyond the agreement were needed. Eadie and Payne LLC. extended their services to ensure the City’s needs were met.

For the FY2021-2022 audit, out of scope services including the following areas were obtained on an urgent basis:

5. Staff Report – Resolution Authorizing Issuance of Purchase Order for Audit Services Provided Outside of the Agreement ($74,593)
Eadie and Payne, LLP
February 4, 2025
2  Preparation of Unaudited Financial Statements for required continuing financial bond-disclosures.
 Audit work on the City’s newly implemented Cost Allocation Plan, which satisfied a State Auditor finding as well
 Additional rushed audit work on Payroll and Benefit transactions targeting areas of troubled staffing in the Controller’s Dept
 Additional audit work regarding Process Walkthroughs of the Cash Receipts and Utility Billing cycles, including Utility Billing testing  Additional audit work on past Fixed Asset transactions  Additional Auditor/City staff meetings to speed up the audit process  Additional audit work to obtain supporting documents for Section 8 program for the Single Audit
These additional needed services resulted in a balance due of $51,024 for out of scope services for invoice #145502. A balance due of $24,246 also existed from invoice #XXXX also resulting from the additional work mentioned above.

Therefore, the following invoices are outstanding:

Invoice #’s Invoice Date Invoice Amount
145386 A 9/9/2024 $24,246
145502 10/7/2024 $51,024
Please see attachment B for invoices
Currently, Purchase Order #23FY1086, which is used to cover the expenditures for the FY2021-2022 audit services, has a remaining balance of $677. Staff is requesting that City Council authorize the City Manager to issue an additional Purchase Order for the amount of Seventy-Four-Thousand Five-Hundred Ninety-Three Dollars ($74,593) for invoices received from Eadie and Payne LLC. for providing needed services for the City beyond the terms of the agreement.

FISCAL IMPACT
Funds for this expenditure are available within Account No.1001-650-000-4266 in the Fiscal Year 2024-2025 City Controller’s Department Budget.

Staff Report – Resolution Authorizing Issuance of Purchase Order for Audit Services Provided Outside of the Agreement ($74,593)
Eadie and Payne, LLP
February 4, 2025
3 RECOMMENDATION
Staff recommends that the City Council adopt the attached Resolution.

APPROVED FOR FORWARDING:

SHARON RAHBAN NAVIZADEH

CITY CONTROLLER FORWARDED TO CITY MANAGER
RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

COMPTON AUTHORIZING THE CITY MANAGER TO ISSUE A PURCHASE

ORDER OF SEVENTY-FOUR THOUSAND FIVE-HUNDRED NINETY-THREE DOLLARS ($74,593) FOR EADIE AND PAYNE’S INVOICES FOR PROVIDING NEEDED SERVICES BEYOND THE TERMS OF THE AGREEMENT.

WHEREAS, in accordance to Section 1419 of the Compton City Charter, the employment of a qualified accountant at the beginning of each fiscal year, who shall examine the books, records, inventories and reports of all officers and employees who receive, handle or disburse public funds and of such other officers, employees and departments as the City Council may direct, is to be completed; and WHEREAS, in June 2023, Resolution No. 25,856 authorized the City Manager to accept the proposal of the Independent Auditor, Eadie and Payne LLC., and enter into a contract to provide the necessary services; and
WHEREAS, During the FY2021-2022 audit process, additional time and services beyond the agreement were needed. Eadie and Payne LLC. extended their services to enure the City’s needs were met; and
WHEREAS, for the FY2021-2022 audit, out of scope services pertaining to the City’s bonds were needed. To assist with this matter, the City Controller solicited the services of Eadie and Payne LLC., resulting in a balance due of $51,024 for out of scope services; and
WHEREAS, in addition to the services for the bonds, the duration for the FY2021- 2022 audit services went beyond the estimated time allocation. Constant correction of errors led to the exhaustion of the estimated hours for audit services before the FY2021- 2022 audit was complete. The additional time to complete the audit resulted in an additional $24,246 invoice from Eadie and Payne LLC. for continued services provided; and
WHEREAS, the following invoices are outstanding:

Invoice #’s Invoice Date Invoice Amount
145386 A 9/9/2024 $24,246
145502 10/7/2024 $51,024
WHEREAS, Purchase Order #23FY1086, which is used to cover the expenditures for the FY2021-2022 audit services, has a remaining balance of $677. Staff is requesting that City Council authorize the City Manager to issue an additional Purchase Order for the amount of Seventy-Four-Thousand Five-Hundred Ninety-Three Dollars ($74,593) for invoices received from Eadie and Payne LLC. for providing needed services for the City beyond the terms of the agreement from account 1001-650-000-4266; and WHEREAS, funds for this expenditure are available within Account No.1001- 650-000-4266 in the Fiscal Year 2024-2025 City Controller’s Budget:

Account Code Account Name Amount
1001-650-000-4266 General Fund $74,593
Controller’s Department
Other Professional Services
WHEREAS, staff recommends the City Council to adopt the attached Resolution to authorize the City Manager to issue an additional Purchase Order for the amount of Seventy-Four-Thousand Five-Hundred Ninety-Three Dollars ($74,593) for invoices received from Eadie and Payne LLC. for providing needed services for the City beyond Resolution No. _________

Page 2 ends

2 the terms of the agreement.; and

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the City Manager is hereby authorized to issue an additional Purchase Order for the amount of Seventy-Four-Thousand Five-Hundred Ninety-Three Dollars ($74,593) for invoices received from Eadie and Payne LLC. for providing needed services for the City beyond the terms of the agreement from account 1001-650-000- 4266.

SECTION 2. That funds for this expenditure are available within Account No.1001-650-000-4266 in the Fiscal Year 2024-2025 City Controller’s Budget:

Account Code Account Name Amount
1001-650-000-4266 General Fund $74,593
Controller’s Department
Other Professional Services
SECTION 3. That a duly copy of the Resolution shall be filed with the offices of the City Manager, City Clerk, City Attorney, and City Controller.

SECTION 4. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this ____________ day of _____________, 2025.
________________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
________________________________

CLERK OF THE CITY OF COMPTON

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss

CITY OF COMPTON )
I, Satra D. Zurita, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council of the City of Compton, signed by the Mayor and attested by the City Clerk at a regular meeting thereof held on this ___________ day of ________________, 2025.

Resolution No. _________

Page 3 ends

3 That said Resolution was adopted by the following vote, to wit:

AYES: COUNCILMEMBERS -
NOES: COUNCILMEMBERS -
ABSTAIN: COUNCILMEMBERS -
ABSENT: COUNCILMEMBERS -
____________________________________

CITY CLERK OF THE CITY OF COMPTON

February 4, 2025
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: CITY MANAGER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON AMENDING THE PUBLIC WORKS ENGINEERING DEPARTMENT’S
2024-2025 FISCAL YEAR BUDGET AND AUTHORIZE THE CITY

MANAGER TO ENTER INTO A PROFESSIONAL SERVICES
AGREEMENT WITH NV5, INC. TO PROVIDE ENGINEERING DESIGN

SERVICES FOR THE CENTER AVENUE GREEN STREET AND STORM
DRAIN IMPROVEMENT PROJECT, CIP# 24-04 AND ESTABLISH A
PURCHASE ORDER IN THE AMOUNT OF $945,688.

SUMMARY
Adoption of this Resolution will amend the Public Works Engineering Department’s 2024- 2025 fiscal year budget and authorize the City Manager to enter into professional services agreement with NV5, Inc. to provide design engineering services pursuant to the Center Avenue Green Street Improvement Project, CIP# 24-04 and establish a purchase order in the amount of $945,688.

BACKGROUND
Section 19.56, subdivision (e) (19) of the Budget Act of 2021 appropriated $10,000,000 from the State General Fund to Caltrans, to be allocated to the City of Compton for the Center Avenue Green Street Improvement Project.

On June 24, 2022, the City of Compton entered into a Funds Transfer Agreement with the California Department of Transportation (Caltrans) in the amount of $10,000,000 for the development of the Center Avenue Green Street Improvement Project.

The Center Avenue Green Street Improvement Project (Project) is an infrastructure project proposed by the City of Compton. The primary objective of the Project is to provide flood protection, improve water quality, and enhance recreational opportunities in the City that currently lack adequate drainage and green space.

The project will extend and expand the existing storm drain system with the construction of catch basins, lateral line, and gravity mains along Center Avenue. Additionally, several structural Low Impact Development (LID) Best Management Practices (BMPs) will be installed, yielding multi-benefits that will improve water quality, water resilience, and watershed protection in the adjacent Compton Creek and downstream into the Los Angeles River.

6. Staff Report – Center Avenue Green Street and Storm Drain Improvement Project, CIP# 24-04, Professional Services Agreement – NV5, Inc.

February 4, 2025

Page 2 ends

The Project targets and enhances a highly urbanized residential area within the City that experience extensive street flooding during storm events. The proposed Project will entail the extension and expansion of the existing storm drain system infrastructure (i.e catch basins, lateral lines, and gravity mains) in the project area, in addition to restoration of the existing road surface.

The proposed Project will also include the installation of structural Low Impact Development (LID) Best Management Practices (BMPs) along Center Avenue; and from Center Avenue along Alondra Boulevad to Compton Creek, which will be specifically designed to capture and/or treat stormwater flow that would otherwise contribute to the current flooding problem. Examples of potential LID BMPs include drywells, parkway bioswales, permeable pavement, and tree wells. Geotechnical investigations will be conducted in the project area to ensure that the existing soil characteristics are suitable for infiltration. The completion of the proposed Project will yield multi-benefits including flood mitigation, improve water quality, increased water supply, water conservation, watershed protection, and the creation of a new natural resource within the City.

The proposed project area is along South Center Avenue from West Greenleaf Boulevard to Alondra Boulevard, South Center Avenue from Alondra Boulevard to South Wilmington Avenue, and along Alondra Boulevard from South Center Avenue to Compton Creek. This encompasses a potential capture area of approximately 150 acres consisting largely of single-family residences.

Installation of LID BMPs along Alondra Boulevard will connect the Center Avenue Green Street project to the City’s Alondra Gateway Park project, which in part of the Compton Creek Implementation Plan’s multi-objective effort to transform the existing Compton Creek right-of-way into a multi-benefit publicly accessible (32,000 sf) green space.

STATEMENT OF THE ISSUE
An essential component of this project is to obtain the services of a qualified and experienced engineering firm to provide design engineering services. On November 13, 2024, staff solicited proposals from qualified design engineering firms to prepare the construction plans, specifications and estimates pursuant to the Center Avenue Green Street Improvement Project.

Staff Report – Center Avenue Green Street and Storm Drain Improvement Project, CIP# 24-04, Professional Services Agreement – NV5, Inc.

February 4, 2025

Page 3 ends

On December 4, 2024, the City received two proposals comprising of NV5, Inc and JMD. A panel of Public Works staff reviewed the submitted proposals. Each consultant was rated based upon their qualifications, experience, a demonstrable understanding of the scope of services, approach, resources and the proposed schedule for project implementation.

The two respondent to the RFP are listed below:

Rank Firm Location Amount
1 NV5 Irvine, CA $945,688
2 JMD City of Industry $779,398
The scope of work required for the preparation of plans, specifications, and estimates for the Center Avenue storm drain project include the following, but not limited to:
 Conduct inventory and assessment of existing storm drain infrastructure, including pipes, culverts, catch basins, and outfalls
 Conduct a geotechnical investigation in the project area to ensure that existing soil characteristics are suitable for infiltration and provide structural/integrity assessment of existing storm drain facilities
 Evaluate the condition, capacity, and performance of the storm drain system and identify flood-prone areas and drainage issues
 Perform underground utility research and request current underground utility asbuilt with original plans and develop an updated substructure plan  Perform technical specifications, construction drawings, probable cost estimate, and any other documents deemed necessary as determined by the consultant, and approved by the City’s Engineer
 Conduct comprehensive inventory of existing drainage facilities including review of as-built from the LA County Public Works Flood Control District and Caltrans  Design Low Impact Developments (LID) Best Management Practices (BMPs) to improve water quality, water resilience and watershed protection in the adjacent Compton Creek and mitigate the effects of erosion and the inherent potential for sedimentation and other pollutants entering the storm water system Staff Report – Center Avenue Green Street and Storm Drain Improvement Project, CIP# 24-04, Professional Services Agreement – NV5, Inc.

February 4, 2025

Page 4 ends

 Perform hydraulic calculations to determine deficiencies in the existing storm drain system including acceptable street capacities based on the LA County requirements
 Identify street segments, and develop complete and comprehensive construction documents
 Prepare Bid Sheet explanations to align with the new construction cost estimate provided
The evaluation process was based upon on several factors including the completeness of the proposal, consultant’s demonstrated understanding of the scope of services, quality of similar work previously performed by the firm, personnel assigned, resources required to perform the required services, and the proposed schedule of work. Given the unique nature of the project, fees for the project were not considered until after the selection of the most qualified firms.

The panel evaluation process resulted in the selection of NV5, Inc. to prepare the construction plans, specifications and estimates for improvement project. NV5, Inc. selection was based on several factors. NV5’s demonstrated its multifaceted technical knowledge that combines engineering design for flood control, drainage, green infrastructure, and citywide experience necessary to deliver the project in the most cost efficient and cost-effective manner. The design portion is estimated to take approximately 467 days.

Addtionally, NV5’s extensive experience and strong existing relationship with the City infrastructure improvement needs, in light of staff shortage has enabled the firm to provide sufficient cost and time efficient services on previous City projects which included: the Emergency Sewer Line Replacement, the Pearl Avenue Sewer Replacement, and the Annual Residential Streets Rehabilitation, Phase 1 and Phase 2.

Therefore, in order to amend the Public Works Engineering Department’s 2024-2025 fiscal year budget and authorize the City Manager to enter into professional services agreement with NV5, Inc. to provide design engineering services pursuant to the Center Avenue Green Street Improvement Project, CIP# 24-04 and establish a purchase order in the amount of $945,686, City Council authorization is necessary.

Staff Report – Center Avenue Green Street and Storm Drain Improvement Project, CIP# 24-04, Professional Services Agreement – NV5, Inc.

February 4, 2025

Page 5 ends

FISCAL IMPACT
The Public Works Engineering Department’s 2024-2025 fiscal year budget will be amended from fund balance as follows:

Increase Expenditures:

Account No. Description Amount
2789-710-040-4300 State Grants $945,688
Capital Outlay
Funds in the amount of $945,688 will be available in the Public Works Engineering Department’s 2024-2025 Fiscal Year budget in Account No. 2789-710-040-4300.

ALTERNATIVE
Council can reject the proposals. However, due to the desire of the City to move forward with this project, no other alternatives is being proposed at this time.

RECOMMENDATION
Staff recommends the City Council adopt the attached Resolution.

JOHN D. STRICKLAND, JR.,

DIRECTOR OF PUBLIC WORKS
APPROVED FOR FORWARDING:

WILLIE A. HOPKINS, JR.

CITY MANAGER

CENTER AVENUE GREEN STREET AND STORM DRAIN PROJECT MAP
RESOLUTION NO. _______

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON AMENDING THE PUBLIC WORKS ENGINEERING DEPARTMENT’S 2024- 2025 FISCAL YEAR BUDGET AND AUTHORIZE THE CITY MANAGER TO ENTER INTO A PROFESSIONAL SERVICES AGREEMENT WITH NV5, INC.

TO PROVIDE ENGINEERING DESIGN SERVICES FOR THE CENTER

AVENUE GREEN STREET AND STORM DRAIN IMPROVEMENT PROJECT, CIP# 24-04 AND ESTABLISH A PURCHASE ORDER IN THE AMOUNT OF $945,688.

WHEREAS, adoption of this resolution will amend the Public Works Engineering Department’s 2024-2025 fiscal year budget and authorize the City Manager to enter into a professional services agreement with and establish a purchase order with NV5, Inc. to provide design engineering services for the Green Street Improvement Project, CIP# 24- 04 in the amount of $ 945,688; and
WHEREAS, section 19.56, subdivision (e) (19) of the Budget Act of 2021 appropriated $10,000,000 from the State General Fund to Caltrans, to be allocated to the City of Compton for the Center Avenue Green Street Improvement Project; and WHEREAS, on June 24, 2022, the City of Compton entered into a Funds Transfer Agreement with the California Department of Transportation (Caltrans) in the amount of $10,000,000 for the development of the Center Avenue Green Street Improvement Project; and
WHEREAS, the Center Avenue Green Street Improvement Project (Project) is an infrastructure project proposed by the City of Compton; and WHEREAS, the primary objective of the Project is to provide flood protection, improve water quality, and enhance recreational opportunities in the City that currently lack adequate drainage and green space; and
WHEREAS, the project will extend and expand the existing storm drain system with the construction of catch basins, lateral line, and gravity mains along Center Avenue; and
WHEREAS, several structural Low Impact Development (LID) Best Management Practices (BMPs) will be installed, yielding multi-benefits that will improve water quality, water resilience, and watershed protection in the adjacent Compton Creek and downstream into the Los Angeles River; and
WHEREAS, the Project targets and enhances a highly urbanized residential area within the City that experience extensive street flooding during storm events and the proposed Project will entail the extension and expansion of the existing storm drain system infrastructure (i.e catch basins, lateral lines, and gravity mains) in the project area, in addition to restoration of the existing road surface; and WHEREAS, the proposed Project will also include the installation of structural Low Impact Development (LID) Best Management Practices (BMPs) along Center Avenue; and from Center Avenue along Alondra Boulevard to Compton Creek, which will be specifically designed to capture and/or treat stormwater flow that would otherwise contribute to the current flooding problem; and WHEREAS, examples of potential LID BMPs include drywells, parkway bioswales, permeable pavement, and tree wells; and
WHEREAS, Geotechnical investigations will be conducted in the project area to ensure that the existing soil characteristics are suitable for infiltration; and RESOLUTION NO.______________

Page 2 ends

WHEREAS, the completion of the proposed Project will yield multi-benefits including flood mitigation, improve water quality, increased water supply, water conservation, watershed protection, and the creation of a new natural resource within the City; and
WHEREAS, the proposed project area is along South Center Avenue from West Greenleaf Boulevard to Alondra Boulevard, South Center Avenue from Alondra Boulevard to South Wilmington Avenue, and along Alondra Boulevard from South Center Avenue to Compton Creek; and
WHEREAS, this encompasses a potential capture area of approximately 150 acres consisting largely of single-family residences; and WHEREAS, installation of LID BMPs along Alondra Boulevard will connect the Center Avenue Green Street project to the City’s Alondra Gateway Park project, which in part of the Compton Creek Implementation Plan’s multi-objective effort to transform the existing Compton Creek right-of-way into a multi-benefit publicly accessible (32,000 sf) green space; and
WHEREAS, an essential component of this project is to obtain the services of a qualified and experienced engineering firm to provide design engineering services and on November 13, 2024, staff solicited proposals from qualified design engineering firms to prepare the construction plans, specifications and estimates pursuant to the Center Avenue Green Street Improvement Project; and
WHEREAS, on December 4, 2024, the City received two proposals comprising of NV5, Inc and JMD; and
WHEREAS, a panel of Public Works staff reviewed the submitted proposals and each consultant was rated based upon their qualifications, experience, a demonstrable understanding of the scope of services, approach, resources and the proposed schedule for project implementation; and
WHEREAS, the two respondents to the RFP are listed below:

Rank Firm Location Amount
1 NV5 Irvine, CA $945,688
2 JMD City of Industry $779,398;
and
WHEREAS, the scope of work required for the preparation of plans, specifications, and estimates for the Center Avenue storm drain project include the following, but not limited to:
 Conduct inventory and assessment of existing storm drain infrastructure, including pipes, culverts, catch basins, and outfalls
 Conduct a geotechnical investigation in the project area to ensure that existing soil characteristics are suitable for infiltration and provide structural/integrity assessment of existing storm drain facilities
 Evaluate the condition, capacity, and performance of the storm drain system and identify flood-prone areas and drainage issues
 Perform underground utility research and request current underground utility asbuilt with original plans and develop an updated substructure plan RESOLUTION NO._____________

Page 3 ends

 Perform technical specifications, construction drawings, probable cost estimate, and any other documents deemed necessary as determined by the consultant, and approved by the City’s Engineer
 Conduct comprehensive inventory of existing drainage facilities including review of as-built from the LA County Public Works Flood Control District and Caltrans  Design Low Impact Developments (LID) Best Management Practices (BMPs) to improve water quality, water resilience and watershed protection in the adjacent Compton Creek and mitigate the effects of erosion and the inherent potential for sedimentation and other pollutants entering the storm water system  Perform hydraulic calculations to determine deficiencies in the existing storm drain system including acceptable street capacities based on the LA County requirements
 Identify street segments, and develop complete and comprehensive construction documents
 Prepare Bid Sheet explanations to align with the new construction cost estimate provided; and
WHEREAS, the evaluation process was based upon on several factors including the completeness of the proposal, consultant’s demonstrated understanding of the scope of services, quality of similar work previously performed by the firm, personnel assigned, resources required to perform the required services, and the proposed schedule of work and given the unique nature of the project, fees for the project were not considered until after the selection of the most qualified firms; and WHEREAS, the panel evaluation process resulted in the selection of NV5, Inc. to prepare the construction plans, specifications and estimates for improvement project; and
WHEREAS, NV5, Inc. selection was based on several factors:

NV5’s demonstrated its multifaceted technical knowledge that combines engineering design for flood control, drainage, green infrastructure, and citywide experience necessary to deliver the project in the most cost efficient and costeffective manner. The design portion is estimated to take approximately 467 days.

NV5’s extensive experience and strong existing relationship with the City infrastructure improvement needs, in light of staff shortage has enabled the firm to provide sufficient cost and time efficient services on previous City projects which included: the Emergency Sewer Line Replacement, the Pearl Avenue Sewer Replacement, and the Annual Residential Streets Rehabilitation Project, Phase 1 and Phase 2; and
WHEREAS, the Public Works Engineering Department’s 2024-2025 fiscal year budget will be amended from fund balance as follows:

Increase Expenditures:

Account No. Description Amount
2789-710-040-4300 State Grants $945,688; and
Capital Outlay
RESOLUTION NO.______________

Page 4 ends

WHEREAS, funds in the amount of $945,688 will be available in the Public Works Engineering Department’s 2024-2025 Fiscal Year budget in Account No. 2789- 710-040-4300; and
WHEREAS, in order to amend the Public Works Engineering Department’s 2024-2025 fiscal year budget, authorize the City Manager to enter into professional services agreement with NV5, Inc. to provide design engineering services pursuant to the Center Avenue Green Street Improvement Project, CIP# 24-04 and establish a purchase order in the amount of $945,686, City Council authorization is necessary.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the City Manager, upon the advice and approval of the City Attorney is hereby authorized to enter into a professional services agreement with and establish a purchase order with NV5, Inc. to provide design engineering services for the Center Avenue Green Street Improvement Project Improvement Project, CIP# 24-04 in the amount of $ 945,688.

SECTION 2. That the Public Works Engineering Department’s 2024-2025 fiscal year budget will be amended from fund balance as follows:

Increase Expenditures:

Account No. Description Amount
2789-710-040-4300 State Grants $945,688
Capital Outlay
SECTION 3. That funds in the amount of $945,688 are available in the Public Works Engineering Department’s 2024-2025 Fiscal Year budget in Account No. 2789- 710-040-4300.

SECTION 4. That a purchase order in the amount of $945,688 shall be established for NV5 Inc. for services to be rendered.

SECTION 5. That copies of this Resolution shall be filed in the offices of the City Manager, City Controller, City Clerk, City Attorney and the Public Works Engineering Department.

SECTION 6. That the Mayor shall sign and the City Clerk shall attest to the adoption of this Resolution.

ADOPTED this ______ day of ____________ 2025.
_______________________________

MAYOR OF THE CITY OF COMPTON
ATTEST:
___________________________________

CITY CLERK OF THE CITY OF COMPTON
RESOLUTION NO.______________

Page 5 ends

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
CITY OF COMPTON: ss
I, Satra D. Zurita, City Clerk of the City of Compton, hereby certify that the foregoing Resolution was adopted by the City Council of the City of Compton, signed by the Mayor and attested by the City Clerk at a regular meeting thereof held on this ________ day of __________________, 2025.

That said Resolution was adopted by the following vote, to wit:

AYES: COUNCILMEMBERSNOES COUNCILMEMBERSABSTAIN COUNCILMEMBERSABSENT COUNCILMEMBERS- ___________________________________

CITY CLERK OF THE CITY OF COMPTON

PROFESSIONAL SERVICES AGREEMENT

BETWEEN

CITY OF COMPTON
AND
NV5, INC
This AGREEMENT is entered by and between the CITY OF COMPTON, a municipal corporation of the State of California (hereinafter referred to as “CITY”) located at 205 South Willowbrook Avenue, Compton, California 90220, and NV5, Inc. (hereinafter referred to as “CONSULTANT”), located at 163 Technology Drive, Suite 100, Irvine, California 92618, (each a “Party” and collectively, the “Parties”).

RECITALS:

WHEREAS, on June 24, 2022, the City of Compton entered into a Funds Transfer Agreement with the California Department of Transportation (Caltrans) in the amount of $10,000,000 for the development of the Center Avenue Green Street Improvement Project.

WHEREAS, the Center Avenue Green Street Improvement Project (Project) is an infrastructure project proposed by the City of Compton; and WHEREAS, the primary objective of the Project is to provide flood protection, improve water quality, and enhance recreational opportunities in the City that currently lack adequate drainage and green space; and
WHEREAS, the project will extend and expand the existing storm drain system with the construction of catch basins, lateral line, and gravity mains along Center Avenue; and
WHEREAS, several structural Low Impact Development (LID) Best Management Practices (BMPs) will be installed, yielding multi-benefits that will improve water quality, water resilience, and watershed protection in the adjacent Compton Creek and downstream into the Los Angeles River; and
WHEREAS, the Project targets and enhances a highly urbanized residential area within the City that experience extensive street flooding during storm events and the proposed Project will entail the extension and expansion of the existing storm drain system infrastructure (i.e catch basins, lateral lines, and gravity mains) in the project area, in addition to restoration of the existing road surface; and WHEREAS, the proposed Project will also include the installation of structural Low Impact Development (LID) Best Management Practices (BMPs) along Center Avenue and from Center Avenue along Alondra Boulevard to Compton Creek, which will be specifically designed to capture and/or treat storm water flow that would otherwise contribute to the current flooding problem; and
Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
2 WHEREAS, an essential component of this project is to obtain the services of a qualified and experienced engineering firm to provide design engineering services; and WHEREAS, by Resolution No. __________, adopted on the ___ day of _______________ 2025, the City Council authorized the City Manager to enter into a contract with NV5, Inc. to perform the services required herein; and WHEREAS, Consultant warrants that it is specifically trained, experienced, competent, and has the resources to provide such services which will be required by this project; and
WHEREAS, Consultant is willing to render such professional services subject to the terms and conditions set forth in this Agreement.

NOW, THEREFORE, Consultant and City, for the consideration, terms and conditions herein described, mutually agree as follows:

AGREEMENT:

1. SCOPE OF SERVICES TO BE RENDERED BY CONSULTANT
It is the mutual understanding of the parties that the CONSULTANT shall perform engineering services to prepare construction plans, design specifications for Center Avenue Green Street Improvement Project” that are defined as scope of work and incorporated hereby, but not be limited to the assessment of the existing infrastructure system, identification of the existing deficiencies, and recommendations for a capital improvement program but also but also to improve the system with the associated costs and budgeting requirements for these improvements. .

In the event of a conflict between the provisions of Exhibit “A” and the terms of this Agreement, the terms of this agreement shall prevail. The City shall have the right to modify the scope of work to delete tasks in whole or in part. and incorporated hereby.

Generally, and as further described in the CONSULTANT’S proposal, the scope of work includes the following tasks:
 Conduct inventory and assessment of existing storm drain infrastructure, including pipes, culverts, catch basins, and outfalls
 Conduct geotechnical investigation in the project area to ensure that existing soil characteristics are suitable for infiltration and provide structural/integrity assessment of existing storm drain facilities.
 All calculations, reports, and plans must be signed and stamped by a California Registered Civil Engineer. All such registrations shall be current Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
3  Evaluate the condition, capacity, and performance of the storm drain system and identify flood-prone areas and drainage issues.
 Perform underground utility research and request current underground utility asbuilt with original plan, and develop an updated substructure plan  Perform technical specifications, construction drawings, probable cost estimate, and any other documents deemed necessary as determined by the consultant, and approved by the City Engineer.
 Conduct comprehensive inventory of existing drainage facilities including review of as-built from the LA County Public Works Flood Control District and Caltrans.  Design Low Impact Developments (LID) Best Management Practices (BMPs) to improve water quality, water resilience and watershed protection in the adjacent Compton Creek mitigate the effects of erosion and the inherent potential for sedimentation and other pollutants entering the storm water system  Perform hydraulic calculations to determine deficiencies in the existing Storm drain system including acceptable street capacities based on the LA County requirements
 Identify street segments, and develop complete and comprehensive construction documents.
 Prepare Bid Sheet and Bid Sheet explanations to align with the new construction cost estimate provided.

At the completion of the project, CONSULTANT shall provide the CITY ten (10) hard copy sets of reports, and manuals developed as part of the operation and maintenance plan.

All work produced shall be provided by CONSULTANT in an electronic format acceptable to the CITY.

It is understood and agreed that CONSULTANT has the professional skills, experience and knowledge necessary to perform the services agreed to be performed under this Agreement and that CITY relies upon the qualifications of CONSULTANT to perform the scope of work in a skillful and professional manner.

CONSULTANT agrees to perform all said work within the Agreement budget and furnish all the necessary materials to complete said services in a manner consistent with that degree of care and skill ordinarily exercised by members of the same profession currently practicing under similar circumstances and to the reasonable satisfaction of the CITY.

Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
4 CONSULTANT services hereunder shall be performed in good, workmanlike and professional manner. CONSULTANT shall be responsible for correcting and completing all errors and omissions related to the services provided by CONSULTANT for this Agreement at no additional cost to the CITY, conditioned however, upon the CITY promptly advising CONSULTANT in writing, within one (1) year following completion of CONSULTANT services under this Agreement, of any errors and omissions. “Errors” and “Omissions” for purposes of this paragraph are defined to mean a failure by CONSULTANT to meet the standards of its profession as set forth in the preceding paragraph.

Acceptance by CITY of the work performed under this Agreement does not operate as a release of CONSULTANT from such professional responsibility for the services performed.

Project Boundaries
Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
5 2. ASSIGNMENT OF PERSONNEL
CONSULTANT has, or will secure, all personnel required to perform the services under this Agreement. CONSULTANT shall make available other qualified personnel of the firm as may be required to complete services. The CITY has the right to approve or disapprove any proposed changes in CONSULTANT’S staff providing service to the CITY. The CITY and CONSULTANT agree such personnel are employees only of CONSULTANT and shall not be considered to be employees of the CITY in any way whatsoever.

Jeffrey M. Coper, PE, Principal-In-Charge of CONSULTANT, shall be primarily responsible for representing CONSULTANT in performance of this Agreement.

3. PROJECT MANAGEMENT & ADMINISTRATION
Mathew Moore, PE will serve as the Project Manager, overseeing the development and execution of the project, tracking the budget and schedule, and serving as the main point of contact for the CITY's project manager. Mr. Moore, PE, will support David Niknaff, PE with Quality Assurance/Quality Control. CONSULTANT proposes to conduct a Scoping Kickoff Workshop with the CITY to confirm the project objectives and future needs, review the status of existing/historical data and validate the project’s approach for success. The intention of the meeting is for the CITY and CONSULTANT team to unify on the CITY's project goals and objectives, understand the extent of available data, and align the level of effort to achieve the project’s overall goal most efficiently and effectively.

4. DURATION OF CONTRACT
CONSULTANT agrees to commence the services provided for herein upon written Notification to Proceed from the CITY and in a diligent and professional manner, until the project is complete or within schedule from receipt of the Notice to Proceed.

5. COMPENSATION
The method of payment for this Contract will be based on time and materials, not to exceed (NTE) amount. The total NTE price paid the CONSULTANT will include compensation for all work, including travel and equipment. No additional compensation will be paid to the CONSULTANT, unless there is a change in the scope of the work or the scope of the project. In the instance of a change in the scope of work or scope of the project, adjustment to the total lump sum compensation will be negotiated between the CONSULTANT and the CITY. Adjustment in the total lump sum compensation will not be effective until authorized and approved by the CITY.

Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
6 Payments will be made monthly in arrears based on the hours of work completed by the CONSULTANT. If CONSULTANT fails to submit an acceptable invoice by the 10th of the month following a month when services were rendered, the CITY shall have the right to delay payment. CONSULTANT shall furnish to the CITY an invoice(s) for work performed, itemizing cost of tasks and hours of work completed. CITY agrees to pay CONSULTANT within 30 days of receipt of invoice(s).

The CONSULTANT is required to comply with all federal, state and local laws and ordinances applicable to the work. This includes compliance with prevailing wage rates and their payment in accordance with California Labor Code, Section 1775.

For services performed CITY agrees to pay and CONSULTANT agrees to accept in full payment for this work, the maximum not-to-exceed sum of up to Nine Hundred Forty Five Thousand Six Hundred Eighty Eighty Dollars ($945,688).

In the event of termination, the CONSULTANT shall be entitled to compensation for the reasonable value of services performed to the effective date of termination; provided, however, that the CITY may condition payment of such compensation upon CONSULTANT delivery to the CITY of any and all CITY property, documents, reports, records, materials and work product associated with the performance of this Agreement.

6. OWNERSHIP OF MATERIALS
All electronic and hardcopy Computer Aided Drafting (CAD) drawings, reports, documents, or other material prepared, developed or discovered by CONSULTANT during the course of providing services pursuant to this Agreement shall be solely the property of the CITY and may be used, reused or otherwise disposed of by the CITY without the permission of the CONSULTANT. Upon completion, expiration or termination of this Agreement, CONSULTANT shall turn over to the CITY all drawings, reports, documents, or other materials prepared, developed or discovered by CONSULTANT during the course of providing services pursuant to this Agreement.

CITY acknowledges that any and all information produced by under this Agreement, including plans, specifications, data, reports, construction documents or electronic files (“documents”), are instruments of professional service. Nevertheless, such documents shall become the property of the CITY upon completion of work and payment of monies due to the CONSULTANT. In the event the CITY consents to, allows, authorizes or approves of changes the CITY recognizes that such changes and the results thereof are not the responsibility of the CONSULTANT. CITY agrees, to the extent permitted by law, to indemnify and hold harmless the CONSULTANT, its officers, directors, employees and sub consultants (collectively “Consultant”) against any claims, damages, liability of costs, including reasonable attorneys’ fees and defense costs, arising from or connected with the unauthorized modification of the documents by the CITY or any person or entity that obtains the documents from or through the CITY. This provision shall also apply to documents delivered to CITY after termination if applicable.

Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
7 7. INDEPENDENT CONTRACTOR STATUS
CONSULTANT, its officers, employees, sub consultants, subcontractors, agents and volunteers (collectively hereinafter the “Consultant”), is a wholly independent Consultant and not an officer, employee, subcontractor or agent of the CITY. Neither the CITY nor any of its officers, employees, agents or volunteers shall have any control over the conduct of the CONSULTANT, except as expressly set forth in this Agreement.

CONSULTANT expressly warrants that while engaged in carrying out and complying with any terms and conditions of this Agreement that CONSULTANT shall not at any time or in any manner, represent that CONSULTANT is in any manner officers, employees, agents or volunteers of the CITY. shall obtain no rights to retirement, health care or any other benefit that accrue to CITY officials, officers, or employees expressly waives any claim to such rights.

8. SUCCESSORS, ASSIGNMENT AND DELEGATION
CITY and the CONSULTANT each binds itself, its partners, successors, assigns and legal representatives to the other hereto and to partners, successors, assigns and legal representatives of such other party in respect to all covenants, agreements and obligations contained in this Agreement.

The expertise and experience of CONSULTANT are material considerations for this Agreement. CONSULTANT shall not assign or transfer any interest in this Agreement or the performance of any of CONSULTANT’S obligations under this Agreement without the prior written consent of the CITY. Any attempted assignment or transfer of any of CONSULTANT’S rights, duties or obligations arising under this Agreement shall be null and void.

9. NONDISCRIMINATORY EMPLOYMENT PRACTICES
During the performance of this Agreement, CONSULTANT agrees not to discriminate against any employee or applicant for employment because of race, sex, creed, Color, religion, age, sexual orientation, marital status, national origin, political affiliation, handicap or belief in accordance with requirements of CITY, State or Federal laws and regulations will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, sex, creed, color, religion, age, sexual orientation, marital status, national origin, political affiliation, handicap or belief in accordance with requirements of CITY, State or Federal laws and regulations. Such actions shall include, but not be limited to the following:
employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoffs or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The CONSULTANT agrees to post in conspicuous places, available to employees, notices setting forth the provisions of this nondiscrimination clause.

Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
8 In the event of CONSULTANT’S non-compliance with the non-discrimination clause of this Agreement, this Agreement may be immediately canceled, terminated or suspended in whole or in part.

10. SUBCONTRACTING
CONSULTANT’S services are unique and personal. Except as may be specified in CONSULTANT’S Proposal and agreed to by the CITY, CONSULTANT will not subcontract any portion of the services without prior written approval of City Manager or his/her designee. If CONSULTANT subcontracts any of the services, CONSULTANT will be fully responsible to CITY for the acts, errors and omissions of CONSULTANT’S subcontractor and of the persons either directly or indirectly employed by the subcontractor, as CONSULTANT is for the acts and omissions of persons directly employed by CONSULTANT. Nothing contained in this Agreement will create any contractual relationship between any subcontractor of CONSULTANT and CITY.

CONSULTANT will be responsible for payment of subcontractors. CONSULTANT will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to CONSULTANT’S work unless specifically noted to the contrary in the subcontract and approved in writing by CITY.

11. OTHER CONSULTANTS The City reserves the right to employ other consultants in connection with the services.

12. INDEMNIFICATION
CONSULTANT shall indemnify and save harmless the CITY, its officials, officers, employees, agents and volunteers (collectively hereinafter the “CITY”), against any and all damages to property or injuries to or death of any person or persons, including property and employees or agents of the CITY and shall defend, indemnify and save the CITY from any and all liability and expense including reasonable defense costs and legal fees, and claims, demands, suits, actions or proceedings of any kind or nature, including Workers’ Compensation claims, of or by anyone whomsoever in any way resulting from or arising out of the negligent or intentional acts or omissions for CONSULTANT, its officers, employees, sub consultants, subcontractors or agents in the performance of the duties undertaken by CONSULTANT pursuant to this Agreement.

This indemnification and hold harmless obligation does not extend to claims arising out of the sole negligence or willful misconduct of the CITY. Notwithstanding the foregoing, with respect to any professional liability claim or lawsuit, this indemnity does not include providing the primary defense of CITY, provided, however, CONSULTANT shall be responsible for CITY’S defense costs to the extent such costs are incurred as a result of CONSULTANT’S negligence, recklessness or willful misconduct.

Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
9 13. INSURANCE
A. Without limiting the CONSULTANT’S indemnification of the CITY, CONSULTANT shall obtain and maintain, at its cost and expense, for the duration of the Agreement and any and all amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the services by CONSULTANT or CONSULTANT’S agents, representatives, employees or subcontractors. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California.

Such evidence shall specifically identify this Agreement and shall contain express conditions that the CITY is to be given written notice at least thirty (30) days in advance of any termination or implementation of a reduction of limits or material change of insurance coverage as specified herein. Failure on the part of the Consultant to procure or maintain insurance shall constitute a material breach upon which the CITY may immediately terminate this Agreement. All insurance required hereunder shall be primary with respect to any insurance maintained by the CITY Coverages and Limits. CONSULTANT will maintain the types of coverages and minimum limits indicated below, unless the Risk Manager or City Manager, in consultation with the City Attorney approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on CONSULTANT’S indemnification obligations under this Agreement. CITY, its officers2, agents, volunteers and employees make no representation that the limits of the insurance specified to be carried by CONSULTANT pursuant to this Agreement are adequate to protect CONSULTANT. The coverage will contain no special limitations on the scope of its protection to the below-designated insured’s except for Workers Compensation and errors and omissions insurance. CONSULTANT will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. If CONSULTANT believes that any required insurance coverage is inadequate, CONSULTANT will obtain such additional insurance coverage, as CONSULTANT deems adequate, at CONSULTANT’S sole expense.

13.1 Commercial General Liability Insurance. $1,000,000 combined single-limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

13.2 Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

13.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
10 $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if CONSULTANT has no employees and provides, to CITY’ S satisfaction, a declaration stating this.

13.4 Professional Liability. Errors and omissions liability appropriate to CONSULTANT’S profession with limits of not less than $1,000,000 per claim. The coverage shall also provide an extended two (2) year reporting period commencing upon termination or cancellation of this Agreement.

Endorsements. For Commercial General Liability Insurance and Automobile Liability Insurance, CONSULTANT will ensure that the policies are endorsed to name the City of Compton and its respective elected and appointed officers, officials, employees, agents and volunteers as “additional insureds” with respect to liability arising out of the activities of the CONSULTANT. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the CITY. Prior to CITY’S execution of this Agreement, CONSULTANT shall furnish certificates of insurance and endorsements to CITY.

Waiver of Subrogation. The policies shall contain a waiver of subrogation for the benefit of CITY.

14. PERMITS AND LICENSES
CONSULTANT, at its own expense, during the term of this Agreement, shall obtain and maintain all appropriate business and professional permits, licenses and certificates that may be required in connection with the performance of services by the CONSULTANT.

Upon execution of this Agreement, the CONSULTANT shall show evidence of a business license permit in conformance with Section 9-1.2 of the Compton Municipal Code.

15. MAINTENANCE AND RECORDS
CONSULTANT will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. CONSULTANT will allow a representative of CITY during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement. CONSULTANT will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years, or longer if required by law, from the date of final payment under this Agreement.

16. WARRANTIES
CONSULTANT represents and warrants (i) that CONSULTANT has no obligations, legal or otherwise, inconsistent with the terms of this Agreement or with CONSULTANT’S undertaking this relationship with CITY, (ii) that the performance of the services called for by this Agreement do not and will not violate any applicable law, Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
11 rule or regulation or any proprietary or other right of any third party, (iii) that CONSULTANT will not use in the performance of his responsibilities under this Agreement any confidential information or trade secrets of any other person or entity and (iv) that CONSULTANT has not knowingly entered into or will enter into any agreement (whether oral or written) in conflict with this Agreement.

17. GENERAL COMPLIANCE WITH LAWS
CONSULTANT will keep fully informed of federal, state and local laws and ordinances and regulations which in any manner affect those employed by CONSULTANT, or in any way affect the performance of the services by CONSULTANT. CONSULTANT will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of the services with all applicable laws, ordinances and regulations. In the event the CONSULTANT encounters any conflict between such laws and ordinances, CONSULTANT shall notify the CITY in writing and the parties agree to work cooperatively to resolve the conflict.

18. TERMINATION
In the event of the CONSULTANT’S failure to prosecute, deliver, or perform the services, after giving written notice of default and two (2) days to correct the same, then, in addition to any other remedies, CITY may terminate this Agreement for nonperformance by notifying CONSULTANT in writing. CONSULTANT has five (5) business days to deliver any documents owned by CITY and all work in progress to CITY address contained in this Agreement. CITY will make a determination of fact based upon the work product delivered to CITY and of the percentage of work that CONSULTANT has performed which is usable and of worth to CITY in having the Agreement completed. Based upon that finding CITY will determine the final payment of the Agreement. In the event CITY elects to terminate, CITY will have the right to immediate possession of all Work Product and work in progress prepared by CONSULTANT, whether located at CONSULTANT’S place of business, or at the offices of a sub consultant.

The CITY ‘S obligation is payable only from funds appropriated for the purpose of this Agreement. All funds for payments after the end of the current fiscal year are subject to the CITY’S legislative appropriation for this purpose. In the event this Agreement extends into succeeding fiscal year periods and the City Council does not allocate sufficient funds for the next succeeding fiscal year payments, this Agreement shall terminate immediately upon written notice from the CITY.

Either Party, upon tendering fifteen (15) calendar days written notice to the other Party, may terminate this Agreement for convenience. In this event and upon request of CITY, CONSULTANT will assemble the Work Product without charge and put it in order for proper filing and closing and deliver it to CITY. CONSULTANT will be paid for work performed to the termination date; however, the total shall not exceed the lump sum fee Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
12 payable under this Agreement. CITY will make the final determination as to the portions of tasks completed and the compensation to be made.

19. COVENANTS AGAINST CONTINGENT FEES
CONSULTANT warrants that CONSULTANT has not employed or retained any company or person, other than a bona fide employee working for CONSULTANT, to solicit or secure this Agreement, and that CONSULTANT has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, CITY will have the right to terminate this Agreement for nonperformance, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee.

20. CLAIMS AND LAWSUITS
By signing this Agreement, CONSULTANT agrees that any Agreement claim submitted to CITY must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation.

CONSULTANT acknowledges that if a false claim is submitted to CITY by CONSULTANT, it may be considered fraud and CONSULTANT may be subject to criminal prosecution. CONSULTANT acknowledges that California Government Code sections 12650 et seq., the False Claims Act, applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity.

These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of information. If CITY seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees. CONSULTANT acknowledges that the filing of a false claim may subject CONSULTANT to an administrative debarment proceeding as the result of which CONSULTANT may be prevented to act as a CONSULTANT on any public work or improvement for a period of up to five (5) years. CONSULTANT acknowledges debarment by another jurisdiction is grounds for CITY to terminate this Agreement.

21. CERTIFICATIONS
The CONSULTANT, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal, State or local agency; has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal, State or local agency within the past 3 years; does not have a proposed debarment pending; and has not been indicted, convicted, or had a civil Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
13 judgment rendered against he/she/it by a court of competent jurisdiction in any matter involving fraud or official misconduct in connection with obtaining, attempting to obtain, or performing a public (Federal, state or local) transaction or contract under a public transaction; violation of Federal or state antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property within the past 3 years; and are not presently indicted or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in the preceding paragraph; and have not had one or more public transactions (Federal, State or local) terminated for cause or default within the past 3 years.

This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction. The above certifications are part of this contract. Signing this agreement on the signature portion thereof shall also constitute signature of the above Certifications.
______________________________________ ___________________ Jeffrey M. Cooper PE, Principal-In-Charge (Date)

22. JURISDICTION, VENUE and GOVERNING LAW
Any action at law or in equity brought by either of the Parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of Los Angeles, State of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county. This Agreement will be governed by the laws of the State of California.

23. TESTIMONY
CONSULTANT will testify at CITY’S request if litigation is brought against CITY in connection with CONSULTANT’S services under this agreement. Unless the action is brought by CONSULTANT, or is based upon CONSULTANT’S actual or alleged negligence or other wrongdoing, CITY, upon prior written agreement with CONSULTANT, will compensate CONSULTANT for time spent in preparation for testimony, testimony, and travel at CONSULTANT’S standard hourly rates at the time of actual testimony.

24. WAIVERS
The waiver by either Party of any breach or violation of any term, covenant, or condition of this Agreement or of any applicable law will not be deemed to be a waiver of such term, covenant, condition or law or of any subsequent breach or violation of same or of Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
14 any other term, covenant, condition or law. The acceptance by either Party of any fee or other payment which may become due under this Agreement will not be deemed to be a waiver of any preceding breach or violation by the other Party of any term, covenant, or condition of this Agreement or any applicable law.

25. AUTHORITY
The individuals executing this Agreement and the instruments referenced in it on behalf of CONSULTANT each represent and warrant that they have the legal power, right and actual authority to bind CONSULTANT to the terms and conditions of this Agreement.

26. SEVERABILITY
If any term, provision, condition or covenant of this Agreement or its application to any party or circumstances shall be held, to any extent, invalid or unenforceable, the remainder of this Agreement, or the application of the term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected, and shall be valid and enforceable to the fullest extent permitted by law.

27. AMENDMENTS
This Agreement may be modified or amended only be written document executed by both CONSULTANT and CITY’S City Manager and approved as to form by the City Attorney. Such document shall expressly state that it is intended by the parties to amend the terms and conditions of this Agreement.

28. CONFIDENTIALITY
All documents, reports, information, data, and exhibits prepared or assembled by CONSULTANT in connection with the performance of the services pursuant to the Agreement are confidential until released by the CITY to the public, and the CONSULTANT will not make any of these documents or information available to any individual or organization not employed by the CONSULTANT or the CITY without the written consent of the CITY before any such release.

29. ENTIRE AGREEMENT
This Agreement, together with any other written document referred to or contemplated by it embody the entire Agreement and understanding between the parties relating to the subject matter of it. The City Manager is authorized, in consultation with the City Attorney, to agree to non-material amendments to this Agreement. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both parties.

Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
15 30. NOTICES
Any notices required or permitted under this Agreement shall be effective when delivered in person; and effective one (1) business day after delivery by facsimile transmission; and effective five (5) days after mailing by U.S. Mail, postage prepaid and properly addressed as follows:

To NV5, Inc.: Jeffrey M. Cooper, PE,
Senior Vice President,
163 Technology Drive, Suite 100, Irvine,
California 92618
(949) 585-0477
To City: City of Compton
205 South Willowbrook Avenue
Compton, California 90220
Attn: Director, Public Works Department
(310) 605-5505
(310) 605-6326 – fax
Copy to: City of Compton
205 South Willowbrook Avenue
Compton, California 90220
Attn: City Manager
(310) 605-5585

31. MISCELLANEOUS
No provision of this Agreement is to be interpreted for or against either party because that party or that party’s legal representative drafted such provision.

Should either party hereto, or any representative, successor or assign of either party hereto, resort to litigation to enforce the provisions of this Agreement, the party or parties prevailing in such litigation shall be entitled, in addition to such other relief as may be granted, to recover its or their reasonable attorney’s fees and costs in such litigation from the party or parties against whom enforcement is sought.

Professional Services Agreement – NV5, Inc.

Engineering Design Services
Center Avenue Green Street Improvement Project CIP# 24-04 Public Works/Resolution No. ______
16 IN WITNESS WHEREOF, CONSULTANT has executed this Agreement, and the CITY, by its City Manager, who is authorized to do so, has executed this Agreement.

CONSULTANT:

NV5
By: ________________ Dated:

Jeffrey M. Cooper, PE, Principal-In-Charge

CITY OF COMPTON
Approved by:

By: _____________________________ Dated: ______________ Willie Hopkins, City Manager
Approved as to form:

By:___________________________ Dated: ______________
Eric J. Perrodin, City Attorney
ATTEST:

By: _____________________ Dated: _____________
Satra D. Zurita, City Clerk

PROPOSAL
Submitted by NV5, Inc.
133 Technology Drive, Suite 200, Irvine, CA 92618
City of Compton
Center Avenue Green Street & Storm Drain Improvements
December 4, 2024
133 Technology Drive, Suite 200 | Irvine, CA 92618 | www.nv5.com | Office: 949.585.0477 | Fax: 949.409.8182 PN: 2820224-0002252.00
Jeffrey M. Cooper, PE
EVP, Chief Operating Officer

COMPANY INFORMATION/CONTACT
Name: NV5, Inc.

Address: 133 Technology Drive, Suite 200,
Irvine, CA 92618
Telephone Number: (949) 585-0477
Email of Contact: [email protected]
December 4, 2024
City of Compton
Attn: Kofi Sefa-Boakye
Public Works Engineering Department
205 South Willowbrook Avenue
Compton, CA 90220
SUBJECT: Engineering Services for the Center Avenue Green Street and Storm Drain Improvements Project
Dear Mr. Sefa-Boakye,
NV5, Inc. is excited to have the opportunity to provide Engineering Services to the City of Compton (City) for its Center Avenue Green Street and Storm Drain Improvements Project. Our team has the technical knowledge and experience to deliver your project in the most cost-efficient and cost-effective manner. NV5’s strengths include the following:

Current Partnership: Our extensive experience and strong existing relationship with the City give us the ability to continue providing engineering services for your capital improvement projects. We operate with a working knowledge of your staff, processes and environment, enabling us to provide outstanding cost- and time-efficient services. NV5 has worked with the City on several projects, including the Emergency Sewer Line Replacement, the Pearl Avenue Sewer Replacement, and the Annual Residential Streets Rehabilitation, Phase 1 and Phase 2.

Relevant Experience: We have a proven track record of successfully providing engineering design services for storm drain improvement projects to municipalities throughout Southern California. Included in this proposal are samples of NV5’s relevant project experience with local cities.

Proposed Team: NV5 offers the City a team of dedicated professionals with proven capability and expertise. We are proposing Matthew Moore, PE, as Project Manager. Mr. Moore brings more than 28 years of experience in the drainage and water resources field, including providing engineering design for flood control, drainage, green infrastructure, water quality, and erosion-control facilities. Mr. Moore will be joined by David Niknafs, PE, as QA/QC Manager, and Luanne Bean, PE, and Tamara O’Neal, PE, for Constructability Review duties. Mr. Niknafs and Ms. Bean have extensive experience working with the City.

Subconsultants: NV5 has a strong and successful working relationship with our subconsultants AirX and Compass Consulting, who we have worked with on numerous projects for various agencies throughout Southern California.

Proposal Authorization and Validity: This proposal has been signed by Jeffrey M. Cooper, PE, a company officer authorized to bind the firm.

Statement: All information submitted with this proposal is true and correct.

NV5 looks forward to the opportunity to work with the City and help you achieve your goals and objectives. If you need further information, we may be reached by phone at (949) 585-0477, or electronically at [email protected] and [email protected]. Thank you for your time and consideration.

Sincerely,
NV5, Inc.

Matthew Moore, PE, QSD, ENV SP
Director of Water Resources

TABLE OF CONTENTS
A & B: General Experience & Project Understanding 04
C. Qualifications and Experience (Project Manager & Project Team) 06 D. Project Approach and Resources 25
E. Project Schedule and Management 40
Cost Proposal and Estimated Fee 43
Consultant Agreement 53
Table of Contents
WHAT MAKES NV5

UNIQUELY QUALIFIED

TO PROVIDE ENGINEERING
SERVICES TO THE CITY?
Strong Design
Background
+ Relevant
Experience
Understanding
+ Delivering
Upon the Needs
of the City
Ability to
Maintain
Close Working
Relationships
with City
Staff
Able to
Oversee,
Manage + Control
Schedules
and Cost
Dedicated +
Qualified
Team Members
who the City
Knows
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 3 Beryl Street Drainage and
Street Improvements
CITY OF REDONDO BEACH | REDONDO BEACH, CA
NV5 provided engineering design services for the Beryl Street Drainage and Street Improvements project, including the preparation of plans, specifications and estimates. The project included roadway, intersection and drainage improvements, including green street elements; modifications to catch basins; pedestrian crossing enhancements through curb ramp and pedestrian signal upgrades; incorporation of Living Street Design principles, traffic calming elements; and signing and striping. The scope of work included field investigation, topographical survey, utility coordination, providing various pavement rehabilitation and site improvement alternatives, conceptual design options, CEQA documentation, and bid and construction support.

DATES: 2020-2022 AGENCY CONTACT: DANIEL GRUEZO, CIVIL ENGINEER, 310.318.0661 X2279, [email protected]
Local Drainage Evaluation/Master Drainage Plan Update
CITY OF IMPERIAL BEACH | IMPERIAL BEACH, CA
NV5 was contracted by the City in 2020 to evaluate storm drain design alternatives to eliminate, or minimize, the flooding at four localized areas of concern (AOC) for the City of Imperial Beach Local Drainage Evaluation Project. The study provides hydraulic and hydrologic analyses for four large drainage areas in the City of Imperial Beach for the 2-, 5-, 10-, and 100-year storm events using 1D and 2D modeling. This study is intended to be used as a planning tool for future storm drain improvements within the City and provides additional analysis of larger storm events that were not previously analyzed in the City’s Master Drainage Plan.

DATES: 2020-2022 AGENCY CONTACT: JUAN LARIOS, PUBLIC WORKS DIRECTOR, 619.424.2214, [email protected] A & B: GENERAL EXPERIENCE & PROJECT UNDERSTANDING
North La Brea Avenue “Green Street”
Improvements
CITY OF INGLEWOOD | INGLEWOOD, CA
NV5 team provided comprehensive design services and final plans, specifications and cost estimates for this “Green Street” improvement project. The project mitigated existing distressed asphalt paving and addressed stormwater runoff issues. Other improvements included: repair of damaged sidewalks, curbs and gutters, cross gutters, alley gutters and driveway approaches; relocation of water meter and other utility boxes; landscape and root pruning; installation of pavement markers and striping to current standards; and reconstruction of media/channelization islands.

DATES: 2017-2018 AGENCY CONTACT: ELOY CASTILLO, PRINCIPAL ENGINEER, 310-412-8716, [email protected]
Relevant Experience
NV5 has provided engineering design and other services for projects similar in scope to the Center Avenue Green Street and Storm Drain Improvements Project. Our team has an outstanding track record for completing projects efficiently and within budget. Here are some relevant examples:

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 4 Lake Drive Storm Drain Replacement
CITY OF ENCINITAS | ENCINITAS, CA
NV5 is providing engineering design services for the Lake Drive Storm Drain Replacement Project, which involves the replacement of approximately 2,000 feet of failed 48-inch corrugated metal pipe (CMP) with new reinforced concrete pipe (RCP) through an environmentally sensitive canyon area between Lake Drive and Interstate 5 (I-5). Design hydraulic analysis revealed the original pipe was significantly undersized, resulting in the failure of the system within the canyon. NV5 recommended that a new detention basin be constructed to attenuate the peak flows through the canyon. During the design period, due to significant rainfall events, a large sinkhole developed at the top of the project limits. NV5 worked closely with the City and emergency construction crews to produce an emergency “interim” design to collect and convey the drainage. The emergency response and “interim” design was subsequently recognized for awards by the San Diego chapters of both the APWA and ASCE.

DATES: 2021-CURRENT AGENCY CONTACT: MATT WIDELSKI, PRINCIPAL ENGINEER, 760.633.2777, [email protected]
Annual Residential Streets Rehabilitation,
Phase 1 and Phase 2
CITY OF COMPTON | COMPTON, CA
NV5 provided engineering design services for the preparation of plans, specifications and estimates for the City’s annual residential street rehabilitation projects. The scope of work included: review and analysis of the City’s existing Pavement Management Study; research of the City’s existing street plan information; performing necessary soil investigations and coring samples; utilities notification and coordination; topographic survey; field review; and improvements to street pavement, street drainage, curb and gutter, sidewalk, and ADA curb ramps.

DATES: 2019-2021 AGENCY CONTACT: JOHN STRICKLAND, PROJECT MANAGER, 310.605.5505, [email protected]
A & B: GENERAL EXPERIENCE & PROJECT UNDERSTANDING
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 5

ENVIRONMENTAL

COMPASS CONSULTING
Julie Gilbert

UTILITY SURVEYS
AIRX

LANDSCAPE

ARCHITECTURE
Thomas Grace, EIT

HYDROLOGY &

HYDRAULICS
Andrea Thomas, PE
Matthew Moore, PE (LID)

STREET DESIGN & LID
Padma Asam, PE, QSD/P,

ENV SP, LEED AP
Jennifer Peterson, PE, CFM,

QSD/P, CPESC, LEED AP
Art Biscocho
Brad Shin, EIT
Matthew Ronquillo
Michael Rocco
Harsho Sanyal, QISP

PROJECT

ENGINEERS/

DESIGNERS

PROJECT MANAGER
Matthew Moore, PE, ENV

SP, QSD/P, TOR

PRINCIPAL-IN-CHARGE
Jeffrey M. Cooper, PE
Organization Chart
Our team of experts bring direct, relevant, successful and current experience working on projects of similar scope and complexity. We are equipped with the resources to provide the CITY with the requested Engineering Services for your project. Shown below are team roles and responsibilities.

C: QUALIFICATIONS & EXPERIENCE

QA/QC MANAGER
David Niknafs, PE
Carl Henderson, Ph.D.,
PE, GE

GEOTECH
Mike Smyth, RLA, ASLA
J Braley, PLS
SURVEY

SUBCONSULTANTS

CONSTRUCTABILITY
REVIEW
Luanne Bean, PE
Tamara O’Neal, PE
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 6 Project Experience
BMP Feasibility Study
KROGER COMPANY | COMPTON, CA
Design Lead. Mr. Moore prepared a stormwater best management practice feasibility study for the Kroger-Ralphs Compton Distribution Facility. The facility is enrolled under and subject to the California Industrial General Permit. In an effort to remain in compliance with permit provisions, additional BMPs are required for the site to meet the water quality requirements of the permit. The site currently employs a variety of site control and structural treatment controls. However, additional advanced treatment BMPs with media filtration are likely required to meet the water quality discharge requirements. This feasibility study presents BMP sizing requirements, siting options, and BMP recommendations for implementation.

Lake Drive Storm Drain Improvements Project
CITY OF ENCINITAS | ENCINITAS, CA
Technical Design Lead. Mr. Moore is providing technical oversight and direction on the preparation of final design Plans, Specifications, and Estimate (PS&E) for this project, which consists of removal and replacement of approximately 2,000 LF of existing 48-inch Corrugated Metal Pipe (CMP) and associated appurtenances from the curb inlet along Lake Drive west through the canyon to I-5 (just before crossing under the freeway). The existing improvements will be replaced with new pipes and appurtenances of similar size and a suitable material. The new storm drain will generally follow the same alignment to preserve existing hydraulic conditions and minimize site disturbances as much as possible.

Los Angeles County Alondra Park Multibenefit
Stormwater Capture Project*
LOS ANGELES COUNTY | LOS ANGELES, CA
Project Manager. Mr. Moore led the design for this multidiscipline design project.

The project will revitalize an existing park with new stormwater infrastructure, new soccer and multipurpose turf fields, two rehabilitated baseball fields, landscaping, and lighting. The project will capture and treat dry-weather and stormwater runoff from a 4,495-acre drainage area, with up to 34 acre-feet of runoff during a single storm event, by retaining runoff in a subsurface storage system. The project also includes Low Impact Development features, including the planting of native and droughttolerant vegetation and trees, bioswales and permeable pavements. Project funding is provided through Measure W, County of Los Angeles, local municipalities, and Caltrans.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

MATTHEW MOORE, PE, ENV SP, QSD/P, TOR
Project Manager
Mr. Moore brings more than 28 years of experience in water resources, including hydrologic and hydraulic engineering design for flood control, drainage, green infrastructure, water quality, and erosion control facilities. His work includes FEMA Flood Insurance Rate Map letters of map amendment/revision (LOMA/R) review for FEMA and preparation of floodplain studies and LOMRs for developers and municipalities. He has extensive experience in hydrologic and hydraulic analyses, including preparation of storm drainage plans and stormwater quality best management practices (BMP) design and documentation. Mr. Moore served on the technical advisory committee for the development of the first San Diego County LID Manual and the San Diego County Hydrology Manual update.

CONTACT INFO
[email protected]

EXPERIENCE
28 years

EDUCATION
M.S. Civil Engineering
B.S. Civil Engineering

LICENSES/CERTIFICATES
Civil Engineer (CA)
No. 56780
Envision Sustainability
Professional (CA)
No. 10891
Qualified SWPPP
Developer/Qualified
SWPPP Practitioner
No. 00046 (CASQA)
Trainer of Record for QSD/
QSP No. 00046

AFFILIATIONS
American Society of Civil
Engineers
* = project performed
while employed at a
different firm
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 7 C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM
Interstate 105 Widening and Improvements*
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LA METRO) | LOS ANGELES, CA Drainage and Water Quality Design Lead. Mr. Moore was the drainage and water quality design lead for this freeway widening and improvement project in central Los Angeles for both the preliminary environmental documentation stage and the design phase through 100 percent submittal to the reviewing agencies. He co-authored the project approval/ environmental document phase water quality assessment report in support of the environmental document. He clearly identified existing project conditions and regulations, project impacts, and construction and operations phase design features required for regulatory compliance and impact minimization. Following environmental document approval, Mr.

Moore led the drainage analysis and design for the project mainly including inlet and pipe replacement along the length of the freeway.

Mid-Coast Corridor Transit Project Drainage Design*
SAN DIEGO ASSOCIATION OF GOVERNMENTS | SAN DIEGO, CA
Drainage and Water Quality Design Lead. Mr. Moore was the Drainage and Water Quality Design Lead for the MidCoast Corridor Transit Project. His responsibilities included drainage and water quality design for the civil improvements consisting of new tracks (at grade and elevated), stations, roadways, retaining walls and bridges. Floodplain analyses were conducted for longitudinal and transverse (bridges) encroachments. Water quality design consists of post-construction Low Impact Development and hydromodification management features to comply with various MS4 permits (City, Caltrans, UCSD) and the Caltrans permit. Drainage and water quality designs were reviewed and coordinated with Caltrans District 11, UCSD, and the City of San Diego. Project challenges included fitting post-construction water quality BMPs within constrained right-of-way with existing utilities.

State Route 76 Floodplain Analysis and Drainage Design* COUNTY OF SAN DIEGO/GRANITE CONSTRUCTION | SAN DIEGO COUNTY, CA Drainage Lead. Mr. Moore was the drainage lead for engineering construction drawings for a 2.3-km widening and realignment of State Route 76 along San Luis Rey River and bridge widening along a river tributary east of Interstate 15.

Mr. Moore’s duties included the preparation of hydrology and hydraulic analyses, reports, and storm drain design for final engineering construction drawings, including Rational Method and Unit Hydrograph Method hydrology calculations, culvert, ditch and inlet design and analysis using WSPG-W and hydraulic floodplain calculations and mapping using HECRAS; bridge scour analysis using HEC-18; sediment transport and scour protection design along San Luis Rey River using HEC-6 and HEC-23; and FEMA CLOMR/LOMR preparation and processing.

Green Streets and Green Parking Lots Design Guidelines and Standards* COUNTY OF SAN DIEGO | SAN DIEGO, CA
Project Manager. Mr. Moore was the Project Manager for the development of Green Streets and Green Parking Lots technical guidance documents, standard drawings, and specifications. The goal of the guidelines and standards are to educate and assist developers and County staff in implementing sustainable green infrastructure. The guidebooks and standards provide a consistent approach to green infrastructure design and implementation. Development of the guidelines, standard drawings and specifications included input from a diverse group, including client, stakeholders, and the public, to evaluate overlapping interests and regulations. The information is now included as part of the County’s Best Management.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 8 Project Experience
Annual Residential Street Rehabilitation, Phase 1 and Phase 2 CITY OF COMPTON | COMPTON, CA
Project Manager. Mr. Niknafs was responsible for providing professional engineering design services, including preparing plans, specifications and estimates for the City’s annual residential street rehabilitation projects. Scope of work included: review and analysis of the City’s existing Pavement Management Study; research of the City’s existing street plan information; performing necessary soil investigations and coring samples; utilities notification and coordination; topographic survey; field review; and improvements to street pavement, street drainage, curb and gutter, sidewalk, and ADA curb ramps.

Wilmington Avenue Pedestrian and Bicycle Improvements
CITY OF COMPTON | COMPTON, CA
Project Manager. Mr. Niknafs was responsible for providing professional design engineering services, including plans, specifications, cost estimates and related bid documents for the Wilmington Avenue Safe Streets Pedestrian/Bicycle Improvement Project. The project included pavement rehabilitation on Wilmington Avenue from El Segundo Boulevard to Rosecrans Avenue. Scope of work consisted of various pedestrian and bicycle improvements; the installation of wider and colored crosswalks; countdown pedestrian signals; enhanced pedestrian lighting; the installation of Class II bike lanes with wayfinding signage and Class I bike paths; and the installation of four solar-powered speed feedback signs for speed control and attainment.

North La Brea Avenue “Green Street” Improvements
CITY OF INGLEWOOD | INGLEWOOD, CA
Project Manager. Mr. Niknafs was responsible for providing comprehensive design services and delivering final plans, specifications and estimates for this “Green Street” improvement project. The project consisted of the street rehabilitation of North La Brea Avenue from the northerly side of Florence Avenue to the City limits, located north of 64th Street. The purpose of the project was to mitigate existing distressed asphalt paving and addressed stormwater runoff issues. As part of the design process, our team evaluated all available design alternatives and developed an NPDES/ MS4-compliant stormwater management plan that takes advantage of a network of pervious surfaces within the parking lanes and green areas with the median and parkway. Other improvements included repair of damaged sidewalks, curbs and gutters, cross gutters, alley gutters and driveway approaches.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

DAVID NIKNAFS, PE
QA/QC Manager
Mr. Niknafs has more than 30 years of civil engineering experience in the public and private sectors working on various capital improvement projects and has extensive experience working as a project director and project manager. He has managed numerous public works and development projects, including roadways, bridges, drainage, sewer, water, underground utilities, building facilities and related infrastructure improvement projects. He is in charge of providing overall project direction to the project technical team and providing resource allocation; preparing and administering budgets; preparing and monitoring project schedules; managing production of preliminary design and final design; preparing various detailed technical reports; providing oversight and performing quality control.

CONTACT INFO
[email protected]

EXPERIENCE
30 years

EDUCATION
M.S. Civil Engineering
B.S. Civil Engineering

LICENSES
Civil Engineer (CA)
No. 42697

AFFILIATIONS
American Public Works
Association (APWA)
American Society of Civil
Engineers (ASCE)
Transportation &
Development Institute
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 9 Project Experience
Pearl Avenue Sewer Replacement
CITY OF COMPTON | COMPTON, CA
Project Manager/Senior Engineer. Ms. Bean is serving as Project Manager and Lead Constructability Review Engineer for the preparation of updated engineering design plans, specifications and construction cost estimates for the Pearl Avenue Sewer Replacement. There are 29 plan sheets and a full set of construction specifications prepared in the old CSI format signed and sealed by the City’s former Public Works Director from January 2016. The City requested NV5 to perform a constructability review on the existing plans, discuss with the City any cost-savings recommendations, update construction costs estimate, update construction specifications, and incorporate updated underground utility research on the current set of plans. NV5 is also providing survey services.

Diversion Pipeline
CITY OF CULVER CITY | CULVER CITY, CA
Project Manager/Construction Manager. Ms. Bean oversaw the construction management, inspection and engineering services for the construction of sewer main diversion pipes reversing sewer flow via conventional cut and cover as well as trenchless jack-and-bore methods to abandon Mesmer and Overland Sewer Pump Stations. This also involved extensive permits and coordination with Caltrans, the City of Los Angeles, and the City of Culver City for these jack-and-bore pipelines underneath the I-405 and Route 90.

Drilling & Equipping of New Water Wells
LONG BEACH UTILITIES DEPARTMENT | LONG BEACH, CA
Project/Construction Manager. Ms. Bean is serving as Project/Construction Manager for the project. As a subconsultant to Wood Rodgers, NV5 is providing Construction Management and Inspection Services for the drilling and equipping of two separate potable water supply wells, with a design capacity of 2,500 gallons per minute.

Located within a City Park, the project requires coordination with residents and management of unhoused individuals. Final well design includes two separate wells housed within a CMU building, with a submersible turbine pump and motor, electrical and SCADA equipment, piping, valving and appurtenances, electrical, instrumentation and control, connection to existing water distribution system, and site restoration.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

LUANNE BEAN, PE
Constructability Review
Ms. Bean has more than 35 years of experience in the engineering, design, and construction of water and wastewater projects. As a Registered Civil Engineer and a former Class A General Engineering Contractor, Ms. Bean has seen construction from both sides of the fence. Her technical skills include specialized structural analysis and design of large 600-MGD water treatment plants, pipelines up to 12 feet in diameter, mechanical analysis, SCADA & I&C oversight and coordination, diesel generator design and AQMD permitting, the preparation of engineering plans, specifications and cost estimates, as well as construction management. She has held various positions with many public agencies, including Structural Discipline Director for Southern Nevada Water Authority’s $6B CIP program, for which she specialized in structural and forensic analysis, Project Manager for the Metropolitan Water District, and Project Officer in charge of disaster funding across three states and five counties for FEMA.

CONTACT INFO
[email protected]

EXPERIENCE
35 years

EDUCATION
M.S. Civil Engineering
B.S. Civil Engineering

LICENSES
Civil Engineer (CA)
No. 50129
Former Class A General
Engineering Contractor

REGISTRATIONS

FEMA OPS - I
HAZMAT First Responder/
Operations Level
DOT Offers of Bulk
and Non-Bulk HAZMAT
Packages
Nuclear Waste Safety
for Workers
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 10 Project Experience
Plan Check & Traffic Engineering Services
CITY OF COMPTON | COMPTON, CA
Plan Check Engineer. Ms. O’Neal is providing professional plan check services for the City’s Public Works Department. Services include technical plan check for engineering documents and plans and review of maps and legal descriptions for conformance with Federal, State and local regulations, particularly the California Subdivision Map Act and general compliance with City Standards, Ordinances and Regulations, including the Low Impact Development requirements identified in City of Compton Ordinance 2,252 (including maintaining database Excel spreadsheet for BMPs tracking through the various stages of development).

Lake Drive Storm Drain Replacement
CITY OF ENCINITAS | ENCINITAS, CA
Project Manager. Ms. O’Neal is managing the team providing engineering design services for the Lake Drive Storm Drain Replacement Project, which involves the replacement of approximately 2,000 feet of failed 48-inch corrugated metal pipe (CMP) with new reinforced concrete pipe (RCP) through an environmentally sensitive canyon area between Lake Drive and Interstate 5 (I-5). The existing system collects runoff from the surrounding developed area and conveys it down a steep slope through a natural canyon and west toward I-5. Design hydraulic analysis revealed the original pipe was significantly undersized. Due to the undersized pipe and downstream constraints, designing a new detention basin was necessary to attenuate the peak flows through the canyon. During the design period, due to significant rainfall, a large sinkhole developed at the top of the project limits, eventually affecting a portion of Lake Drive and local utilities, prompting an emergency response by the City. NV5 worked closely with the City and the emergency construction crews to produce an emergency “interim” design to collect and convey the drainage. At the same time, the failed slope and adjacent roadway were reconstructed.

On-Call Plan Check + Public Works Inspection Services
CITY OF BEAUMONT | BEAUMONT, CA
Project Manager. Ms. O’Neal is providing the City with review of as-needed private development projects and public works inspection services. Reviews include improvement, sewer and storm drain plans, hydrology and hydraulic reports, water quality reports, geotechnical reports, structural calculations and cost estimates. NV5 is assisting the City with the development of checklists, standard notes, unit price lists and other documents to standardize and streamline the review/inspection process.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM
TAMARA O’NEAL, PE
Constructability Review
Ms. O’Neal has more than 28 years of experience in municipal and private engineering services, including capital improvement and development review project management, sewer rehabilitation design and planning, stormwater quality regulatory, reporting and review services, asset management, floodplain development services and environmental restoration services. In addition to having direct public agency employment experience, Ms. O’Neal has provided extension of staff services on a consultant basis for numerous cities, as well as water and sanitation districts in San Diego, Orange, Riverside and Los Angeles counties.

CONTACT INFO
[email protected]

EXPERIENCE
28 years

EDUCATION
B.S. Civil Engineering

LICENSES/CERTIFICATES
Civil Engineer (CA)
No. 69107
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 11 Project Experience
Oak Knoll Road Improvements
CITY OF POWAY | POWAY, CA
Project Engineer. Ms. Asam performed plan and profile design, storm drain system design and driveway profile design. The 1-mile road improvement project stretched through a variety of zoned areas that required the roadway design width to vary throughout its length and meet the unique needs of each zoned area — commercial, high density, and residential. Roadway improvements included necessary demolition, relocation of overhead utilities, pavement rehabilitation, pavement overlay, curb, gutter, sidewalks, on-street parking, signage and striping, traffic control, signal modifications, drainage, traffic calming, retaining walls and landscaping.

Alley Paving Improvements
CITY OF IMPERIAL BEACH | IMPERIAL BEACH, CA
Ms. Asam prepared alley improvement, drainage improvement plans and specifications for an award-winning “Green Streets” project. Incorporating Low Impact Development techniques and complying with new stormwater regulations, the project paved 22, 20-foot-wide alleys to provide improved access to residences whose homes front the alleyways. The improved alley design called for a ‘V’-shaped cross-section with a 2-foot strip of pervious concrete along the center flowline with filtration material and an underdrain connecting to an existing storm drain system. In instances where no outfall was available, the underdrain was connected to a new dry well structure, which provided additional water quality benefits. In addition to providing an all-weather driving surface, drainage improvements, and water quality enhancements, the project repaired deteriorating sewer mains and relocated existing overhead utility poles within the City’s right-of-way.

On-Call Plan Check Services
CITY OF LAKE ELSINORE | LAKE ELSINORE, CA
Plan Check Engineer. Ms. Asam provided review of Water Quality Technical Reports, grading plans, tract improvement plans, parcel mergers and lot line adjustments.

Other tasks included reviewing hydrology and hydraulic data output calculations in conjunction with proposed storm drain design and reviewing NPDES documents for conformance to jurisdictional requirements and the City’s Standard Urban Stormwater Management Plan as needed and as required by the Regional Water Quality Control board.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

PADMA ASAM, PE, QSD/P, ENV SP, LEED AP
Project Engineer/Designer
Ms. Asam has 17 years of design experience in public work projects, including design of roadway widening and alignments, retaining walls, pedestrian ramps, engineering reports and utility undergrounding. She is adept in the design standards of various local public agencies in Southern California. Ms. Asam has extensive experience reviewing grading plans, street and storm drain improvement plans, utility plans, tract maps, structural plans and details and stormwater-related documents. She has extensive experience working with local funding agencies to prepare and administer grant applications on behalf of local agency clients. In addition to submitting progress reports, applications for funding, and closeout documentation, she has coordinated public outreach efforts and developed strong working relationships with Caltrans Local Assistance staff.

CONTACT INFO
[email protected]

EXPERIENCE
17 years

EDUCATION
M.S. Structural
Engineering
B.S. Civil Engineering

LICENSES/CERTIFICATES
Civil Engineer (CA)
No. 83896
Qualified SWPPP
Developer/ Qualified
SWPPP Practitioner
No. 27085
Envision Sustainability
Professional
LEED Accredited
Professional
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 12 Project Experience
Lake Drive Storm Drain Replacement
CITY OF ENCINITAS | ENCINITAS, CA
Project Engineer. Ms. Peterson is providing engineering design services for the Lake Drive Storm Drain Replacement Project, which involves the replacement of approximately 2,000 feet of failed 48-inch corrugated metal pipe (CMP) with new reinforced concrete pipe (RCP) through an environmentally sensitive canyon between Lake Drive and Interstate 5 (I-5). Design hydraulic analysis revealed the original pipe was significantly undersized, resulting in the failure of the system. Designing a new detention basin was necessary to attenuate the peak flows through the canyon. During the design period, due to significant rainfall, a large sinkhole developed, eventually affecting a portion of Lake Drive and local utilities, prompting an emergency response by the City. NV5 worked with the City and the emergency construction crews to produce an emergency “interim” design to collect and convey the drainage.

Alley Paving Improvements
CITY OF IMPERIAL BEACH | IMPERIAL BEACH, CA
Project Engineer. Ms. Peterson was responsible for design and support calculations for pervious pavement sections for an award-winning “Green Streets” project.

Incorporating Low Impact Development techniques and complying with new stormwater regulations, the project paved 22, 20-foot-wide alleys to provide improved access to residences whose homes front the alleyways. The improved alley design called for a ‘V’- shaped cross-section with a 2-foot strip of pervious concrete along the center flowline with filtration material and an underdrain connecting to an existing storm drain system.

The project provided an all-weather driving surface, drainage improvements, and water quality enhancements.

Revelle College Drive Educational Stormwater Treatment
UNIVERSITY OF CALIFORNIA SAN DIEGO (UCSD) | SAN DIEGO, CA Project Manager. The goal of this project was to design an educational stormwater and water quality treatment system for this 6-acre drainage basin by diverting runoff from the existing storm drain system into a proposed bioretention basin. As project manager for NV5 and the civil work, Ms. Peterson worked closely with UCSD and the Landscape Architect to develop a concept from which grading and landscape plans were prepared. The final design consisted of a series of bioretention basins that students could walk through and signage about how stormwater was being treated.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

JENNIFER PETERSON, PE, CFM, QSD/P, CPESC, LEED AP
Project Engineer/Designer
Ms. Peterson is a senior project manager with 27 years of focused experience working in the water resources field and managing stormwater projects — from the planning stages all the way through design and construction. She has managed stormwater inspection staff throughout California and provides assistance to other offices and project managers in preparing technical documents and addressing challenging issues related to the State’s General Construction Permit, and Phase I and II Municipal (MS4) Permits. She has managed stormwater programs for various agencies throughout the state, which has included preparation and review of technical water quality documents, creating tools and processes for efficient plan check reviews, stormwater training, review and editing of technical specifications, and management of various stakeholders and subconsultant staff.

CONTACT INFO
jennifer.peterson
@nv5.com

EXPERIENCE
27 years

EDUCATION
B.S. Civil Engineering
(Environmental)

LICENSES/CERTIFICATES
Civil Engineer (CA)
No. 67821
Qualified SWPPP
Developer/Qualified
SWPPP Practitioner
(CA) No. 00502 (CASQA)
Certified Floodplain
Manager
Certified Professional
in Erosion & Sediment
Control
LEED Accredited
Professional
AWARDS + HONORS
2024 Outstanding
Service Award for
contributions to CASQA’s
Construction General
Permit Training Team
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 13 Project Experience
North La Brea Avenue “Green Street” Improvements
CITY OF INGLEWOOD | INGLEWOOD, CA
Project Designer. Mr. Biscocho prepared plans, specifications and estimates for for this “Green Street” improvement project. The project consisted of the street rehabilitation of North La Brea Avenue from the northerly side of Florence Avenue to the City limits, located north of 64th Street. The purpose of the project was to mitigate existing distressed asphalt paving and addressed stormwater runoff issues. As part of the design process, our team evaluated all available design alternatives and developed an NPDES/MS4-compliant stormwater management plan that takes advantage of a network of pervious surfaces within the parking lanes and green areas with the median and parkway. Other improvements included repair of damaged sidewalks, curbs and gutters, cross gutters, alley gutters and driveway approaches.

Beryl Street Drainage and Street Improvements
CITY OF REDONDO BEACH | REDONDO BEACH, CA
Project Engineer. Mr. Biscocho provided engineering design services for the Beryl Street Drainage and Street Improvements project, including the preparation of plans, specifications and estimates. The project included roadway, intersection and drainage improvements, including green street elements; modifications to catch basins; pedestrian crossing enhancements through curb ramp and pedestrian signal upgrades; incorporation of Living Street Design principles, traffic calming elements to enhance safety, mobility, and access for users to accommodate a variety of transportation modes; and signing and striping.

Annual Residential Street Rehabilitation (Phases 1 and 2) CITY OF COMPTON | COMPTON, CA
Project Designer. Mr. Biscocho was responsible for preparing plans, specifications and estimates for the City’s annual residential street rehabilitation projects. Scope of work included review and analysis of the City’s existing Pavement Management Study; research of the City’s existing street plan information; performing necessary soil investigations and coring samples; utilities notification and coordination; topographic survey; field review; and improvements to street pavement, street drainage, curb and gutter, sidewalk, and ADA curb ramps.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

ART BISCOCHO
Project Engineer/Designer
Mr. Biscocho has more than 30 years of experience as a Project Designer. He has a demonstrated ability to manage multiple projects from planning to construction closeout. He has a wealth of knowledge of the overall operational experience working with municipal agencies, and his qualifications include the ability to review and prepare construction plans, specifications and cost estimates; provide engineering counter assistance; process permits; and establish, maintain and foster positive working relationships with agency staff.

CONTACT INFO
[email protected]

EXPERIENCE
30 years

EDUCATION
B.S. Civil Engineering
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 14 C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM
Project Experience
FY 2023-24 Street Rehabilitation
CITY OF PLACENTIA | PLACENTIA, CA
Project Engineer. Mr. Shin is providing engineering design services for the City’s FY 2023-24 Street Rehabilitation project as part of our on-call contract with the City. The project includes repaving or slurry seal for various streets within the City. In general, the work consists of asphalt overlay, slurry seal; replacement of damaged sidewalk, curb, and gutter; and new signing, striping, markings, and pavement legends. The work includes the preparation of two bid packages – one for residential/local streets and one for arterial streets. NV5 will prepare storm drain improvement plans for the intersection of Walnut Avenue and Center Street based on the Storm Drain Master Plan Update and prepare preliminary and final bid packages and cost estimates for the project.

Cherry Avenue and Other Roads, Fontana Area
COUNTY OF SAN BERNARDINO | FONTANA, CA
Project Engineer. Mr. Shin is providing engineering design services, including preparation of final plans, specifications and cost estimates for the project, which involves pavement rehabilitation to Cherry Avenue and other roads (approximately

14.72 miles) and for the replacement of existing ADA ramps at 42 locations in the Fontana area. NV5 will review the existing topographic to ensure new ramps drain properly and identify and address localized drainage issues within the project footprint.

Hacienda Avenue Spa Zone Street Improvements
CITY OF DESERT HOT SPRINGS | DESERT HOT SPRINGS, CA
Project Engineer. Mr. Shin is providing engineering design services for the City’s Hacienda Avenue Spa Zone Street Improvements project. The improvement project extends from Tamar Drive to the city limits. The purpose of the project is to provide pedestrian and bicycle safety infrastructure improvements. There are currently no bike lanes along this 1.9-mile segment of Hacienda Avenue. The project proposes to construct 10,341 feet of sidewalks, 9,450 square feet of safety medians, 42 ADA ramps, 8,528 feet of buffered bike lanes, 8,872 feet of standard Class II bike lanes, 99 streetlights, 17 crosswalks, and one intersection safety improvement. The scope of work includes utility coordination; topographic and right-of-way surveys and preparation of base maps, legal descriptions and plats; pavement investigation and recommendations; preparation of preliminary and final plans, specifications and estimates; environmental documentation; and bid and construction support.

BRAD SHIN, EIT
Project Engineer/Designer
Mr. Shin has experience working on various public improvement and private land development projects related to street, planning, grading, sewer, water, drainage, stormwater and erosion design for construction of residential, commercial, industrial and infrastructure facilities. He is experienced in preparing engineering construction documents (plans, specifications, reports, and calculations) and in utilizing AutoCAD Civil 3D, Hydroflow, Microsoft Office Programs, Bluebeam, CivilD, EPANET, and WSPG.

Mr. Shin has 10 years of experience as a project manager in South Korea, where he participated in coordination meetings with internal design teams and external consultants, contractors and public agencies during implementation of public land development and infrastructure projects.

CONTACT INFO
[email protected]

EXPERIENCE
16 years

EDUCATION
B.S. Civil Engineering

LICENSES/CERTIFICATES
Engineer-in-Training
(CA) No. 171980
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 15 Project Experience
Plan Check & Traffic Engineering Services
CITY OF COMPTON | COMPTON, CA
Assistant Engineer. Mr. Ronquillo is assisting the team that is providing professional plan check services and traffic engineering services for the City’s Public Works Department. Services include technical plan check for engineering documents and plans and review of maps and legal descriptions for conformance with Federal, State and local regulations, particularly the California Subdivision Map Act and general compliance with City Standards, Ordinances and Regulations, including the Low Impact Development requirements identified in City of Compton Ordinance 2,252 (including maintaining database Excel spreadsheets for BMPs tracking through the various stages of development). NV5 also performs various Traffic Engineering Services.

FY 2023-24 Street Rehabilitation
CITY OF PLACENTIA | PLACENTIA, CA
Assistant Engineer. Mr. Ronquillo is assisting the team responsible for providing engineering design services for the City’s FY 2023-24 Street Rehabilitation project as part of our on-call contract with the City. The project includes repaving or slurry seal for various streets within the City. In general, the work consists of asphalt overlay, slurry seal; replacement of damaged sidewalk, curb, and gutter; and new signing, striping, markings, and pavement legends. The work includes the preparation of two bid packages – one for residential/local streets and one for arterial streets. NV5 will prepare storm drain improvement plans for the intersection of Walnut Avenue and Center Street based on the Storm Drain Master Plan Update and prepare preliminary and final bid packages and cost estimates for the project. NV5 will also provide construction support services.

Hacienda Avenue Spa Zone Street Improvements
CITY OF DESERT HOT SPRINGS | DESERT HOT SPRINGS, CA
Assistant Engineer. Mr. Ronquillo is assisting the team responsible for providing engineering design services for the City’s Hacienda Avenue Spa Zone Street Improvements project. The improvement project extends from Tamar Drive to the city limits. The purpose of the project is to provide pedestrian and bicycle safety infrastructure improvements. There are currently no bike lanes along this 1.9- mile segment of Hacienda Avenue. The project proposes to construct 10,341 feet of sidewalks, 9,450 square feet of safety medians, 42 ADA ramps, 8,528 feet of buffered bike lanes, 8,872 feet of standard Class II bike lanes, 99 streetlights, 17 crosswalks, and one intersection safety improvement. The scope of work includes utility coordination; topographic and right-of-way surveys and preparation of base maps, legal descriptions and plats; pavement investigation and recommendations; preparation of preliminary and final plans, specifications and estimates; environmental documentation; and bid and construction support.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

MATTHEW RONQUILLO
Project Engineer/Designer
Mr. Ronquillo is an Assistant Engineer experienced in the plan check, design and administration of public works projects. He is skilled in AutoCAD, ArcGIS, Civil 3D, structural analysis, and analyzing design and contract documents. He is well-versed in the Greenbook, Standard Plans for Public Works Construction, and interpreting City standards.

CONTACT INFO
matthew.ronquillo
@nv5.com

EXPERIENCE
2 years

EDUCATION
B.S. Civil Engineering
A.S. Engineering
A.A. Science &
Mathematics
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 16 Project Experience
Lake Drive Storm Drain Replacement
CITY OF ENCINITAS | ENCINITAS, CA
Project Designer. Mr. Rocco is providing engineering design services for the Lake Drive Storm Drain Replacement Project, which involves the replacement of approximately 2,000 feet of failed 48-inch corrugated metal pipe (CMP) with new reinforced concrete pipe (RCP) through an environmentally sensitive canyon between Lake Drive and Interstate 5 (I-5). Design hydraulic analysis revealed the original pipe was significantly undersized, resulting in the failure of the system. Designing a new detention basin was necessary to attenuate the peak flows through the canyon. During the design period, due to significant rainfall, a large sinkhole developed, eventually affecting a portion of Lake Drive and local utilities, prompting an emergency response by the City. NV5 worked with the City and the emergency construction crews to produce an emergency “interim” design to collect and convey the drainage.

Alley Paving Improvements
CITY OF IMPERIAL BEACH | IMPERIAL BEACH, CA
Senior Designer. Mr. Rocco was responsible for the preparation of plans, specifications, and construction estimates of an award-winning “Green Streets” project. Incorporating Low Impact Development techniques and complying with new stormwater regulations, the project paved 22, 20-foot-wide alleys to provide improved access to residences whose homes front the alleyways. The improved alley design called for a ‘V’-shaped cross-section with a 2-foot strip of pervious concrete along the center flowline with filtration material and an underdrain connecting to an existing storm drain system. The project provided an all-weather driving surface, drainage improvements, and water quality enhancements.

Revelle Stormwater Treatment Facility
UC SAN DIEGO | SAN DIEGO, CA
Revelle College received a grant for a water quality demonstration and water conservation (turf removal) project to be located on a site near the south end of the campus at the corner of North Torrey Pines Road and Revelle College Drive. Following completion of the topographic survey by NV5, NV5 staff developed a preliminary design that intercepted flow from an existing storm drain system and conveyed it along a meandering sidewalk via a shallow, landscaped bioswale to a series of four biofiltration basins that treated the flows, incorporated enhanced wall elements and stepped down toward Torrey Pines Road to preserve the architectural character of the proposed landscape improvements and amenities.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

MICHAEL ROCCO
Project Engineer/Designer
Mr. Rocco is a Senior Civil Designer with more than 22 years of experience. He is highly proficient in AutoCAD and AutoCAD Civil3D. He has experience working on projects in all phases, from concept to construction. He excels in the development of complete plan sets, understands the importance of plan presentation and construction details, effectively uses digital terrain model surfaces and field data provided by survey teams, and is able to review geotechnical data to assist with earthwork quantity calculations.

His experience includes construction management and field inspection. He has the technical experience to lead plan development for roadway geometric layout, site design, grading, retaining walls, striping, signing, and traffic control.

CONTACT INFO
[email protected]

EXPERIENCE
22 years

EDUCATION
AutoCAD University
NV5 Project Manager
Course

LICENSES/CERTIFICATES
CADD Drafting & Technical
Drawing Certificates

AFFILIATIONS
American Public Works
Association (APWA)
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 17 C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

CONTACT INFO
[email protected]

EXPERIENCE
2 years

EDUCATION
M.S. Civil Engineering
(concentration on
Water Resources
& Environmental
Engineering)
B.S. Civil Engineering

LICENSES/CERTIFICATES
Engineer-In-Training (EIT),
New York, No. 096647

AFFILIATIONS
California Stormwater
Quality Association
(CASQA)
New York Water and
Environmental Association
(NYWEA)
* = project performed
while employed at a
different firm

HARSHO SANYAL, QISP
Project Engineer/Designer
Mr. Sanyal brings two years of dedicated experience in the environmental industry, specializing in stormwater management. His professional background is rooted in New York and New Jersey, where he has adeptly authored reports detailing compliance with stormwater quality and quantity standards set forth by the New Jersey Department of Environmental Protection. Additionally, Mr. Sanyo has demonstrated expertise in compliance within Flood Hazard Areas (FHAs). His comprehensive understanding of environmental regulations, coupled with a proven track record, positions him as a valuable asset in navigating the complexities of stormwater management within regulatory frameworks.

Mr. Sanyal’s project portfolio encompasses extensive hydraulic and hydrologic modeling, crucial for evaluating peak flows and flow depths on project sites. To achieve these objectives, he proficiently utilizes a diverse range of software, including Hydraflow Hydrographs, HEC-RAS, PCSWMM, InfoWorks ICM, and StormCAD.

Additionally, he demonstrates proficiency in leveraging ArcGIS for hydrologic analysis and mapping data. Complementing his analytical skills, he has actively contributed field support during inspections of sewer networks and green infrastructure projects.

Project Experience
Canoe Brook PFAS Pilot Study*
NEW JERSEY AMERICAN WATER | MILLBURN, NJ
Stormwater Engineer. Mr. Sanyal determined the watershed area of Canoe Brook and analyzed land cover across delineated subcatchments. He built a hydrologic model to calculate peak flow across 2-, 10- and 100-year storms, as well as Design Flood flows.

He built an HEC-RAS model to calculate water surface profiles and limits of inundation.

He authored an initial draft of a Flood Hazard Area (FHA) permit report. The purpose of this project was to determine the FHA at the site due to Canoe Brook, as there were no such flood plans available from FEMA or NJDEP at this location. These updated elevations would be used for the design of a PFAS treatment facility at the site.

NJTA Interchange 17*
NEW JERSEY TURNPIKE AUTHORITY | SECAUCUS, NJ
Stormwater Engineer. Mr. Sanyal delineated the project into subcatchments, analyzed land cover, and determined peak flows with a hydrologic model. He sized detention basins to meet stormwater quality requirements. He analyzed gutter flow with StormCAD to determine the required gutter size. He drafted flow and subcatchment figures for reports with MicroStation. The purpose of the project was to relocate a ramp that merges onto the New Jersey Turnpike. As a result of this relocation, impervious surface and motor vehicle surface were altered, leading to new requirements for stormwater management.

Sydney Metro*
CITY OF SYDNEY | SYDNEY, NSW, AU
Hydrology Engineer. Mr. Sanyal delineated project area subcatchments and created shape files for overland flow. He generated an InfoWorks ICM model and generated hydrologic results across the project area. The purpose of the project is to construct a metro line connecting the Sydney area, facilitating fast transport. Hydrologic analysis was being done near track and node locations to determine construction parameters.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 18 C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM
Project Experience
Project Management, Construction Management & Inspection Services CITY OF POWAY | POWAY, CA
Project Manager/Construction Manager. Ms. Thomas’ responsibilities included maintaining responsible charge of approximately 50 Capital Improvement projects during all phases of a project life cycle, managing and maintaining productive working relationships across departments to productively include all stakeholders, and setting up procedures and creating training materials in support of Virtual Project Management software for department use on all capital projects. She also prepared and delivered presentations to City Council in support of resolution adoptions, contract awards, project acceptance, and funding requests. Ms. Thomas also managed multiple construction projects concurrently, including field inspections, RFIs, and change orders, coordinated and delivered the design, contract negotiations, contracts, and construction of Poway’s Annual Pavement Management Program. The program coordinates separate, concurrent, and time-constrained construction contracts for asphalt repair, slurry coating, and striping improvements.

Pedestrian Improvements at B Street Cruise Terminal
PORT OF SAN DIEGO | SAN DIEGO, CA
Project Engineer. Ms. Thomas is providing engineering design services for pedestrian improvements at the B Street Cruise Terminal at the Port. The Port is seeking to reconstruct existing surface improvements and establish an operational separation between pedestrian traffic along the embarcadero/“boardwalk” area and the front of the existing Cruise Ship Terminal Building. The proposed project will replace and reconfigure aging surface improvements to allow for improved pedestrian queuing and access movements during peak use times. The proposed project will include removing and reconstructing existing AC pavement, existing curb and gutter, and sidewalk and pedestrian ramp improvements. The project will incorporate the use of removable pedestrian barriers to be placed as needed by District staff during designated times.

Engineering and Capital Improvement Projects
CITY OF SAN DIEGO | SAN DIEGO, CA
Associate Civil Engineer. Ms. Thomas was responsible for managing federal grant projects citywide from allocation to completed construction, reviewing and evaluating plans for tenant improvements, ADA improvements, and grant applications. She also prepared RFPs, specifications and bid advertisements, coordinated environmental permit processes and funding documents on behalf of grant awardees for City Council approval, and reviewed projects in progress for emerging stormwater regulation and compliance with SWPPPs and BMPs.

ANDREA THOMAS, PE
Street Designer
Ms. Thomas has over 23 years of experience in the civil engineering field, including project management, construction management, customer service, payroll/project accounting, and labor and contract compliance.

CONTACT INFO
[email protected]

EXPERIENCE
23 years

EDUCATION
M.S. Civil Engineering
B.S. Civil Engineering

LICENSES/CERTIFICATES
Civil Engineer (CA)
No. 68926

AFFILIATIONS
American Society of Civil
Engineers
WateReuse San Diego and
Inland Empire Chapters
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 19 Project Experience
Lake Drive Storm Drain Replacement
CITY OF ENCINITAS | ENCINITAS, CA
Project Engineer. Mr. Grace is providing engineering design services for the Lake Drive Storm Drain Replacement Project, which involves the replacement of approximately 2,000 feet of failed 48-inch corrugated metal pipe (CMP) with new reinforced concrete pipe (RCP) through an environmentally sensitive canyon between Lake Drive and Interstate 5 (I-5). Design hydraulic analysis revealed the original pipe was significantly undersized, resulting in the failure of the system. Designing a new detention basin was necessary to attenuate the peak flows through the canyon. During the design period, due to significant rainfall, a large sinkhole developed, eventually affecting a portion of Lake Drive and local utilities, prompting an emergency response by the City. NV5 worked with the City and the emergency construction crews to produce an emergency “interim” design to collect and convey the drainage.

On-Call Plan Check + Public Works Inspection Services
CITY OF BEAUMONT | BEAUMONT, CA
Project Manager. Mr. Grace is part of the team providing the City with review of asneeded private development projects. Reviews include improvement, grading, and erosion control plans, sewer and storm drain plans, hydrology and hydraulic reports, water quality reports, geotechnical reports, structural calculations, and cost estimates.

NV5 has also been providing stormwater management support for construction, MS4, and Industrial permits as staff extension to the City. We assisted the City with a recent RWQCB audit and have represented the City at the Riverside County Technical Advisory Committee (TAC) meetings, which discuss overall stormwater compliance topics within the region. NV5 has helped write stormwater guidance for developers and City staff to use as well as their Local Implementation Plan (LIP), and their annual stormwater progress report.

Bradley Road Bridge Over Salt Creek, Preliminary Drainage Study CITY OF MENIFEE | MENIFEE, CA
Project Engineer. This project consists of improving Bradley Road between Rio Vista Drive and Potomac Drive within the City of Menifee, Calif. This improvement consists of providing an all-weather crossing at Salt Creek in lieu of the existing two-pipe culvert dip crossing. Such an improvement is necessary for the surrounding communities that get stranded even after a five-year storm event as the roadway gets completely flooded and becomes impassable. This is a safety concern to the senior citizen community because emergency vehicles cannot reach them without having to go through a lengthy detour. Duties included: hydrologic and hydraulic analyses.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

THOMAS GRACE, EIT
Hydrology & Hydraulics
Mr. Grace is a registered Engineer-in-Training with over 24 years of experience specializing in hydrologic and hydraulic engineering for urban drainage facilities, flood control improvements, floodplain studies and water quality compliance documentation.

His work includes preliminary and final engineering design phases, as well as SWPPP and SUSMP documentation. He is skilled in using HEC-RAS, Auto-CAD, WSPG, HECHMS, FlowMaster, CulvertMaster, HY-8, CivilCAD, AES Model, Pond Pack, StormCAD, and SWMM.

CONTACT INFO
[email protected]

EXPERIENCE
24 years

EDUCATION
B.S. Civil Engineering

LICENSES/CERTIFICATES
Engineer in Training, CA
No. 103177
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 20 Project Experience
Foothill Boulevard, Verdugo Boulevard, and Angeles Crest Highway Landscape Median Replacement
CITY OF LA CAÑADA FLINTRIDGE | LA CAÑADA FLINTRIDGE, CA Sr. Landscape Architect. Our team is providing engineering and landscape architectural design services to our client, who is interested in reducing maintenance, capturing stormwater, and improving the roadside aesthetics on a mile of existing streets running through the center of town. The existing median landscapes are a mix of turf grasses, degraded shrub beds, and street trees, little of which is indigenous.

The replacement landscaping will feature tree protection, and the removal of the turf, shrubs, and aged underground irrigation systems. Once the site soils have been repaired and the new irrigation system installed, the medians will be planted with compatible groupings of native, drought-tolerant shrub and ground-cover plants. To improve the stormwater capture and pre-treatment, the finish grades will be modified to slope inward from the curbs, which should aid in the on-site retention and infiltration without affecting the roadway base and sub-base conditions.

Broadway Creek Restoration
CITY OF EL CAJON | EL CAJON, CA
Sr. Landscape Architect. Mr. Smyth managed the design and production of preliminary and final planting and permanent irrigation designs and contract documents for the Broadway Creek Restoration project. The existing creek had been channelized to minimize flood damage to neighboring properties and was in a degraded condition following years of high-flow erosion and the establishment of invasive species. To improve aesthetic and functional values within the channel, the bottom was opened to promote groundwater recharge and slow high flow rates.

First San Diego River Improvements*
CITY OF SAN DIEGO | SAN DIEGO, CA
Landscape Designer. Mr. Smyth was responsible for developing the preliminary design needed to gain land use approval for the widening of the existing channel between SR163 and I-5. Following land use and design review approvals, Mr. Smyth prepared the final planting and irrigation contract plans for the 3.2-mile-long improvements located in Mission Valley. Designed as a flood control project for a consortium of federal, state and local agency funding partners, the project was deemed a priority after historic flooding caused extensive damage to adjacent properties, while creating a more future higher-density development and build-out. Important landscape design elements included invasive vegetation removal, homogeneous emergent, riparian and upland vegetative communities, waterfowl habitat, and miles of new, paved, multi-use path.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

MIKE SMYTH, RLA, ASLA
Landscape Architecture
Mr. Smyth has decades of professional landscape architecture experience working throughout the Western United States and manages NV5’s Landscape Architecture Studio, which provides service center support to the entire company. In addition to his conventional landscape architecture experience, Mr. Smyth is also experienced in the many facets of environmental design, including wetland mitigation and riparian restoration, and stormwater facility vegetation to comply with water quality standards.

He is very experienced at providing bid and construction support services, as well as post-construction monitoring services.

CONTACT INFO
[email protected]

EXPERIENCE
37 years

EDUCATION
B.S. Landscape
Architecture

LICENSES/CERTIFICATES
Registered Landscape
Architect
(CA) No. 3231
(CO) Pending
(OR) No. 0317
(WA) No. 1070
(AZ) No. 56354

AFFILIATIONS
American Society of
Landscape Architects
(ASLA)
Council of Landscape
Architectural Registration
Boards (CLARB) No. 0773
DHS Federal Emergency
Response Official (FEMA
CERT)
* = project performed
while employed at a
different firm
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 21 Project Experience
FY 2022-23 Pavement Management Program Implementation
CITY OF GLENDALE | GLENDALE, CA
Survey Manager. Mr. Braley is providing surveying services as part of the team that is providing engineering design services for the City’s Fiscal Year 2022-23 Pavement Management Program Implementation project. Improvements include selective removal and repair of concrete curbs and gutters, sidewalks, driveways, cross gutters, catch basins, bus pads, and alley aprons; pavement repairs, including full-depth reconstruction, rubberized asphalt pavement wearing course (ARHM); crack seal; Asphalt Rubber Aggregate Membrane (ARAM); and Slurry Seal Type II; sewer point repairs based on City-provided CCTV videos; utility pull box relocation; storm drain infrastructure analysis and design, including hydrology and hydraulic analysis if needed; installation of survey well monuments; tree plantings, including coordinating with the City for tree species and locations; and review of the City’s Bicycle Master Plan and design of plans according to recommendations.

Park Manor Reservoir Slope Repair and Debris Mitigation CITY OF GLENDALE WATER AND POWER | GLENDALE, CA
Survey Manager. Mr. Braley is providing surveying services as part of the team that is providing engineering design services for the Park Manor Reservoir Slope Repair and Debris Mitigation project. Park Manor Reservoir is a 3.5-million-gallon, concrete-lined, potable water reservoir near the Glendale Freeway. The project addresses erosion that has occurred on the top of the slope and a catch basin that is consistently blocked with debris received from the hillside. Engineering design services include slope repair and maintaining a 10-foot to 12-foot-wide road and crest at the top to mitigate further erosion. The design will also include debris mitigation to prevent debris from washing into the catch basin. Services include meetings and coordination; topographic survey; geotechnical investigation; preparation of preliminary and final plans, specifications and cost estimate; and bidding, construction and post-construction support.

On-Call Plan Check Services
CITY OF SEAL BEACH | SEAL BEACH, CA
Plan Check Engineer. Mr. Braley is part of the NV5 team providing on-call engineering plan check services to the City for land development projects, including grading, drainage, street improvements, hydrology reports, Water Quality Management Plans (WQMP), National Pollutant Discharge Elimination System (NPDES) reports, and Storm Water Pollution Prevention Plans (SWPPP); utilities permits/plans; surveying; and subdivision projects, including lot line adjustments, tract maps, parcel maps and certificates of compliance.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM

J BRALEY, PLS
Survey
Mr. Braley has more than 45 years of experience as a Land Surveyor in California, Oregon, Washington, Nevada, and Virginia for public works agencies, institutional agencies, and private land developers. He has a strong background in right-of-way mapping, boundary and title-related issues as well as topographic surveys, horizontal and vertical control, final monument and construction staking. Mr. Braley was the survey project manager on several large projects, including the mapping for over 100 sections, resolving the boundaries on over 1,800 parcels within those sections, and resolved boundaries for 30 miles of the Los Angeles Aqueduct.

CONTACT INFO
[email protected]

EXPERIENCE
45 years

EDUCATION
General Education courses
Land Survey courses
Land Surveying
Fundamentals
AutoCAD Level 1 & Level 2
Global Positioning Survey
course
GIS course

LICENSES/CERTIFICATES
Professional Land Surveyor
(CA) No. 8446
Professional Land Surveyor
(NV) No. 19903
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 22 Project Experience
FY 2022-23 Pavement Management Program Implementation
CITY OF GLENDALE | GLENDALE, CA
Geotechnical Project Manager. Dr. Henderson is providing geotechnical engineering services as part of the team that is providing engineering design services for the City’s Fiscal Year 2022-23 Pavement Management Program Implementation project.

Improvements include selective removal and repair of concrete curbs and gutters, sidewalks, driveways, cross gutters, catch basins, bus pads, and alley aprons; pavement repairs, including full-depth reconstruction, rubberized asphalt pavement wearing course (ARHM); crack seal; Asphalt Rubber Aggregate Membrane (ARAM); and Slurry Seal Type II; sewer point repairs based on City-provided CCTV videos; utility pull box relocation; storm drain infrastructure analysis and design, including hydrology and hydraulic analysis if needed; installation of survey well monuments; tree plantings, including coordinating with the City for tree species and locations; and review of the City’s Bicycle Master Plan and design of plans according to recommendations.

Beryl Street Drainage and Street Improvements
CITY OF REDONDO BEACH | REDONDO BEACH, CA
Geotechnical Project Manager. Dr. Henderson provided geotechnical engineering services as part of the team that provided engineering design services for the Beryl Street Drainage and Street Improvements project, including the preparation of plans, specifications and estimates. The project included roadway, intersection and drainage improvements, including green street elements; modifications to catch basins; pedestrian crossing enhancements through curb ramp and pedestrian signal upgrades; incorporation of Living Street Design principles, traffic calming elements to enhance safety, mobility, and access for users to accommodate a variety of transportation modes; and signing and striping.

Annual Residential Street Rehabilitation
CITY OF COMPTON | COMPTON, CA
Geotechnical Project Manager. Dr. Henderson provided geotechnical engineering services for the project. The scope of work includes review and analysis of the City’s existing Pavement Management Study; research of the City’s existing street plan information; performing necessary soil investigations and coring samples; utilities notification and coordination; topographic survey; field review; and improvements to street pavement, street drainage, curb and gutter, sidewalk, and ADA curb ramps.

C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM
CARL HENDERSON, Ph.D., PE, GE
Geotechnical Engineer
Dr. Henderson has more than 25 years of experience performing geotechnical evaluations for a wide variety of projects, including water and wastewater, bridges, highways, roadways, embankments, levees, buildings, land development, commercial and industrial facilities. He has extensive experience with embankment construction and stability evaluations for many large roadway construction projects in California.

Over the last 12 years, he has served as the Senior Geotechnical Project Manager and Geotechnical Project Manager for some of the largest highway and bridge projects within San Joaquin County.

CONTACT INFO
[email protected]

EXPERIENCE
25 years

EDUCATION
Ph.D. Civil Engineering
M.S. Civil Engineering
(Geotechnical)
B.S. Civil Engineering

LICENSES/CERTIFICATES
Geotechnical Engineer (CA)
No. 2886
Civil Engineer (CA)
No. 71115

AFFILIATIONS
American Public Works
Association (APWA) -
Member
American Indian Science
and Engineering Society
(AISES) - Member
National Society of Black
Engineers (NSBE) –
Lifetime Member
Society of American
Military Engineers (SAME)
- Member
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 23 C: QUALIFICATIONS & EXPERIENCE OF PROJECT TEAM
Subconsultants
NV5 will enlist the following subconsultants to assure all requirements of the project are completed by an expert in the field and finished in a timely and cost-effective manner.

AirX Utility Surveyors, Inc. (AirX) has been providing quality Subsurface Utility Engineering (SUE) services in Southern California for over seventeen years and is one of San Diego’s SUE technology leaders. Our areas of operation include the San Diego, Los Angeles, Riverside, San Bernardino, Imperial and Orange Counties. We are federally certified “Woman-Owned Small Business” (#WOSB170968) by the SBA; state certified “Small Business Enterprise” (#36366) with California DGS; “Women’s Business Enterprise” (#10050096) with the CPUC; San Diego Small Local Business Enterprise (#11AU0373) in San Diego; and certified by the County of Los Angeles as a Community Business Enterprise (#85737). AIRX offers a comprehensive package that includes: vacuum excavation; locating services (with USA callout ticket support as needed); ground penetrating radar (GPR); video inspection (CCTV) of ducts, sewer & storm drains; right of way & traffic control plans and permit processing; traffic control equipment & personnel; report documentation; and road surface repairs. It is our goal to provide Clients with superior, quality services tailored to meet their needs and project requirements.

Compass Consulting Enterprises, Inc (Compass) is a full-service environmental consulting firm, serving the project life cycle from concept to construction and restoration. Compass’ project management team members have more than 25 years of experience in providing a variety of environmental services throughout Southern California. Compass was founded in July 2020 by Julie Gilbert, a veteran environmental planner with more than 25 years of experience in the sectors of public works, transportation, public utilities, public relations, and private development. Ms. Gilbert’s career highlights include serving as a senior environmental planner for the County of San Bernardino Department of Public Works, where she prepared the State and Federal environmental documents for multiple County road and flood control projects.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 24 D: PROJECT APPROACH & RESOURCES
Project Understanding
We understand that the City of Compton (City) entered
into a $10 million funding agreement with the California Department of Transportation (Caltrans) that authorized transfer of State funds to the City for the implementation of this Project. The funds transfer agreement was executed on June 24, 2022, and the City has since secured the
funding allocation.

The primary objectives of this multi-benefit project include:
1) the expansion and extension of the City’s existing
storm drain system with the construction of catch basins, lateral pipes, and gravity storm drain mainline along
Center Avenue; 2) installation of several structural Low Impact Development (LID) water quality Best Management
Practices (BMPS); and 3) ancillary pavement replacement within the limits of the storm drain improvements. Project implementation will result in multiple benefits including flood mitigation and water quality and water resilience improvements within the Compton Creek and Los Angeles
River watersheds.

PROJECT SETTING
The Project analysis and design focus area will be
predominately within S. Center Avenue from W. Greenleaf Boulevard to Alondra Boulevard and S. Center Avenue
from Alondra Boulevard to W. Laurel Street, and Alondra Boulevard from S. Center Avenue to Compton Creek. The
potential water quality capture area is approximately 150 acres of predominately residential development (See
Figure 1 below for Project Location).

Figure 1. Project Vicinity Map (with 150 acre watershed) City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 25 D: PROJECT APPROACH & RESOURCES
Existing main line storm drains within
the project area are shown on Figure
2 (at right) and consist of the following
systems:
• S. Wilmington Avenue (BI 2602,
Line D)
○ South of Compton Boulevard:
48-inch to 60” Reinforced
Concrete Pipe (RCP) on west side
of Wilmington flowing north to
Compton
• Alondra Boulevard (BI 2602, Line
E)
○ Wilmington Avenue to Compton
Creek: 33-inch to 48-inch RCP on
south side of Alondra Boulevard
flowing east to creek
• W. Greenleaf Boulevard (BI0422,
Line J)
○ Wilmington Avenue to Oleander
Street: 69-inch to 78” RCP on
south side of Greenleaf. There
is a 39-inch RCP lateral stub at
Center Avenue.

There are several local drainage
features within the project vicinity that
drain the local and collector roads that
include curb and gutter, cross gutters,
ribbon gutters, catch basins, small
diameter storm drain pipes, and outlets
to Compton Creek (See Figure 3 at
right).

Figure 2. Storm Drain Mainlines in Project Vicinity
Figure 3. Local Storm Drains in Project Vicinity
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 26 D: PROJECT APPROACH & RESOURCES
The project area consists of gently sloping or nearly flat terrain with drainage from the residential areas generally toward the collector roads and associated mainline storm drains or toward Compton Creek. Based on a review of the Federal Emergency Management Agency (FEMA) flood insurance rate maps, the Project area is not located within a FEMA mapped floodplain. Based on a review of aerial photos and street views, the intersections along S. Center Avenue in the residential neighborhood between Greenleaf Boulevard and Alondra Boulevard generally do not have any notable drainage features (with the exception of the two catch basins east of the S. Center Avenue and W. Raymond Street). Due to the general lack of curb, gutter, and drainage infrastructure, the roadway intersections along S. Center Avenue in this neighborhood, which is categorized as a two-lane collector road, experience shallow flooding and associated poor pavement conditions (See Figure 4 below).

Figure 4. Intersection of S. Center Avenue and W. Tichenor Street The residential neighborhood north of Alondra Boulevard is a more recent development than south of Alondra Boulevard with the street sections containing curb and gutter, cross gutters, and several catch basins. Intersection flooding does not appear to be an issue in this neighborhood (See Figure 5 below).

Figure 5. Intersection of S. Center Avenue and W. Cypress Street City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 27 D: PROJECT APPROACH & RESOURCES
An update of the Citywide Pavement Management Program
(PMP) was issued in 2024. This report provides Pavement Condition Indices (PCI) for each roadway section in the City network, along with recommended maintenance
and repair strategies and a forecasted maintenance and
rehabilitation report based on 2024 roadway inspections.

A summary of the pavement conditions within the Project vicinity is shown in Figure 6 below. Note that S. Center Ave. has very poor PCI scores south of Alondra Blvd. (PCI < 40), and poor (PCI 41-59) to fair (PCI 60-74) scores
north of Alondra Blvd. Alondra Blvd. east of S. Center Ave. is rated as very good. The maintenance type assigned to S. Center Ave. from W. Greenleaf Blvd. to W. Laurel St. is Asphalt Rubber Hot Mix (ARHM) in Fiscal Year 2026-2027.

Alondra Blvd. from S. Center Ave. to Compton Creek is
not scheduled for near term maintenance. Although the
primary focus of the Project based on the Caltrans funding agreement project description is not PMP implementation, the PMP report information can help inform and prioritize future drainage and roadway upgrades in the Project
Figure 6. 2024 Pavement Condition Index Exhibit
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 28 D: PROJECT APPROACH & RESOURCES
Project Approach and Resources
The main objective of the project design approach is to first satisfy the Project objectives set forth in the funding agreement with Caltrans. These objectives are focused
on flood mitigation, water quality improvements, and
enhanced recreational opportunities in areas that currently lack adequate drainage and green space. Secondary
project benefits will be realized by roadway surface
replacement in the vicinity of Project elements, particularly along S. Center Avenue.

The general project design approach will consist of the following primary scope elements which are discussed in more detail below.

Scope Elements
• Project Management
• Data Collection and Review
• Survey and Topography
• Utility Research and Mapping
• Geotechnical Study
• Drainage Study and Stormwater Management Plan
• Conceptual Design
• Environmental Compliance (CEQA)
• Final Design (PS&E)
• Bid and Construction

PROJECT MANAGEMENT
Prior to initiating preliminary design development, the NV5 team will conduct a kick-off meeting with the City’s project manager to clarify scope tasks, deliverables, assumptions, budget, schedule, invoicing, reporting, and roles and
responsibilities. In coordination with the City, the NV5 team will establish regular monthly project progress check-in meetings and milestone deliverable review meetings. NV5 project management will also consist of project schedule tracking and updates, monthly invoicing and progress
reports, agency and other coordination as needed.

Deliverables:

Meeting agendas and minutes, monthly progress reports

DATA COLLECTION AND REVIEW
Prior to initiating field visits or activities, the NV5 team will collect reports, storm drain, street, and other improvement plan drawings that are readily available online, or obtained by research at the City, County, and Caltrans offices. It is anticipated that the initial data obtained will be storm drain, sewer, water and street record drawings, floodplain mapping, hydrology and hydraulic reports, watershed
studies, and other background information. This will
include a comprehensive inventory of existing drainage
facilities including review of as-built record drawings obtained from the Los Angeles County Public Works Flood Control District and Caltrans. Following this initial data collection and review effort, members of the NV5 design team will conduct on-site field review and data collection to verify the location of drainage facilities, drainage patterns, roadway conditions, and items that require detailed field survey information. NV5 designers will collect information on existing project vicinity drainage, roadway, and other features using handheld GPS data recorders, cameras,
and portable computers to log and record the information for later review at the office and to coordinate with the NV5 survey group prior to their field survey work. The data collected in the field by the designers will be cataloged and mapped in a GIS and/or platform for future reference by the entire design team and the City.

Note that the RFP requested the following information:
“Describe options available for data gathering, rating
Calculations, photo or video features, retrieval of data, report capabilities, mapping abilities, etc. Also, describe options available and recommend actions for maintaining the information (by the City), once turned over and
accepted. Describe process of analysis to be used to
make recommendations for roadway improvements and
projections related to annual allocation needs, impact of not funding needs, etc. Describe impact each alternate
item would have on collection process of project.” The NV5 team will gather field data using standard data retrieval procedures using handheld GPS units and/or tablets with data transferred to a GIS application for storage, display, and mapping. The team will work with the City to format the data so that it can be utilized by the City.

Deliverables:

GIS, CAD, photos, and notes of design field investigations

SURVEY AND TOPOGRAPHY
NV5 Survey will perform a topographic survey of the areas shown on the attached Exhibit A and prepare a CAD/
Civil 3D drawing of planimetrics and a Civil 3D surface based on the survey. Said survey will be based on existing published horizontal and vertical control. Street Rightof-Way information will be shown based from record GIS mapping information only.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 29 D: PROJECT APPROACH & RESOURCES
NV5 Survey will provide the following Survey services.

Survey Task 1
• Project Research
NV5 will research and obtain existing GIS locations
showing the approximate street right-of-way.

Horizontal control will be established per California
State Plane Coordinates Zone 5, US Survey Feet.

Vertical control will be established per Los Angeles
County record benchmarks at or near the project site.
• Horizontal, Vertical, Boundary Control, Aerial Targets NV5 will establish horizontal and vertical control from GPS Observations processed through OPUS NGS
Online service. Horizontal Datum will be California
State Plane Coordinates Zone V US Survey feet and
Vertical Datum will be NAVD 88 derived from L.A.

County Benchmarks at or near the site. Boundary
control will be provided from record maps and
monuments of record found during the field survey
and research process. Aerial targets will be set per
locations provided by aerial consultant RJ Lung.
• Topographic Design Survey (See Survey Exhibit A on
page 31)
NV5 will conduct a field survey (see yellow areas
on Exhibit A) of existing topographic features that
includes all surface features: roadways, driveways,
curb ramps, sidewalks, curb and gutter, trees and
other vegetation, existing striping, traffic signals, light poles, power poles, pull boxes, manholes, storm drain
inlets, fire hydrants, and any other surface-visible
utilities. The extents of the survey will be within the limits as shown on Exhibit A. Limits of survey will be
from back of sidewalk to back of sidewalk along the
street right-of-way. Design level survey will be merged with aerial survey to provide continuity between
Design & Aerial survey data.

Any survey monuments that are found during the
field survey will be located and shown on the plans.

The inverts on gravity utilities will be measured if
accessible.

Survey Task 2
• Aerial Topography Survey (See Survey Exhibit A on
page 31)
NV5 shall coordinate with our Aerial Mapping
Consultant (RJ Lung & Associates) to provide aerial
flight and topographic mapping of the project area
(see green area on Exhibit A). NV5 shall place the
required number of photo control targets to support
the aerial photogrammetry (topographic mapping
standards in accordance with FGDC Geospatial
Positioning Accuracy Standards, Part 4: Architecture,
Engineering, Construction, and Facilities Management
(FGDC-STD-007.4-2002), nominally with a plotting
scale of 1”= 40’ and equivalent vertical accuracy for

1.0 contour intervals.

The aerial photogrammetry will include the following:

1. 40 scale mapping with one-foot (1.00’) contour
intervals

2. Spot elevations at approximate 50-foot grid
Deliverables
Deliverables shall be a Version 2022 AutoCAD
Civil3D file along with a PDF exhibit of the work area.

Mapping will be in conformance with FGDC Geospatial
Positioning Accuracy Standards, Part 4: Architecture,
Engineering, Construction, and Facilities Management
(FGDC-STD-007.4-2002), nominally with a plotting
scale of 1”= 20’’ and equivalent vertical accuracy for
1’ contour intervals.

QA/QC & Accuracy
All work will be directed, overseen, and checked by a
licensed Land Surveyor.

Horizontal and vertical accuracy of design survey
points will be +/-0.05’. Surface contours will have an
accuracy appropriate to a one-foot contour interval,
i.e., +/-1.0 feet.

Horizontal and vertical accuracy of aerial survey data
will be +/- 0.20 feet.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 30 D: PROJECT APPROACH & RESOURCES
Survey Exhibit A
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 31 D: PROJECT APPROACH & RESOURCES

UTILITY RESEARCH AND MAPPING
NV5’s utility lead (AirX) will research existing utility infrastructure including franchise utilities. The goal
is to identify all utilities that may be impacted by the improvement project, including research of the Prior Rights to clearly identify parties responsible for relocation of applicable utilities. The NV5 team routinely engages in utility company coordination for various design projects in the Region so are aware of most providers and their
requirements. NV5 will provide the City with verification of utility company review of design plans and/or verification of utility research. NV5 will lead the utility coordination effort and maintain a log of utilities and status. Utility location and potholing recommendations and exhibits will be prepared at this stage for City review prior to engaging utility location contractors. It is anticipated that the utility coordination effort will be focused along S. Center Avenue, Alondra Boulevard, and at the intersections of S. Center Avenue and W. Greenleaf Boulevard and Center Avenue
and Alondra Boulevard — intersections where there a
number of existing underground and overhead utilities.

Deliverables:

Subsurface utility 2D basemap, utility record drawings, and log of utility company coordination

GEOTECHNICAL STUDY
The purpose of the geotechnical investigation will be
to provide geotechnical information for the proposed
improvements and provide recommendations, from
a geotechnical standpoint, regarding storm drain and
utility installation, pavement structural evaluation, and pavement replacement along S. Center Avenue and
Alondra Boulevard. Our proposed scope of services for the geotechnical investigation will include the following:
• Review of preliminary project plans, if available.
• Prepare traffic control plans and obtain a right-of-way, and boring permits from the City of Compton and the
County of Los Angeles
• Site visit and mark-out of proposed boring locations.

As required by the state of California, NV5 will notify Underground Service Alert of the locations of our
planned exploration prior to drilling. NV5 will also
utilize a private utility locator to mark utilities at the proposed boring locations. Any available subsurface
utility information should also be provided to NV5 prior to initiating field exploration to reduce the potential for damaging existing utilities at the site.
• Perform a field investigation of the underlying
geotechnical subsurface conditions at the site by
advancing up to nine (9) exploratory borings at depths
between 10 to 20 feet below ground surface (bgs) or
practical refusal at select locations along the project alignments within public right-of-way.
○ Borings will be drilled using a hollow-stem auger
truck-mounted drill rig.
○ The exploratory borings will be logged and sampled
by a qualified geologist or an engineer from NV5.
○ Borings performed in paved areas within the public
right-of-way are assumed to require hot patching
in accordance with permit requirements. Please
note that budget has been included for asphalt
hot patching, assuming approximately nine (9)
locations. NV5 assumes hot patching of 8-inch
diameter bore holes with 5-7 inches of asphaltic
concrete (AC) (material: PG64-10 hot-mix), rolled for
compaction and smoothness, SS1H tack bonding oil
to existing asphalt edges, not requiring edge overlay.
• Conducting up to four (4) infiltration tests at
depths up to 5 feet below ground surface (bgs) or
practical refusal at select locations along the project alignments within public right-of-way.
• Traffic control for borings located in the public rightof-way will be provided in accordance with W.A.T.C.H Manual for Traffic Control and permit requirements.

NV5 has assumed that approximately six (6) days
of traffic control will be required for the following
activities:
• Field exploration (exploratory borings), and
• Hot patching
• Based on NV5’s review of the preliminary project
information, it is understood that the exploration
locations will be in the public right-of-way and traffic control will be required. The services of a traffic
control subcontractor have been included for all nine
(9) locations.
• Appropriate laboratory testing of representative
samples of the soils encountered. Laboratory tests
may include in-situ moisture content and density,
soil classification (sieve analysis), Atterberg Limits, sand equivalent, expansion index, direct shear tests,
R-value and corrosivity testing.
• Evaluate the accumulated information and develop
conclusions and recommendations addressing the
geotechnical aspects of the project.
• Preparation of a geotechnical report summarizing
the results of our geotechnical investigation and
presenting recommendations, from a geotechnical
standpoint, regarding the proposed construction. The
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 32 D: PROJECT APPROACH & RESOURCES
report will discuss the current site conditions, geologic hazards and general geotechnical conditions affecting
the project site. Items addressed will include the
following:
○ Existing pavement sections
○ Recommendations regarding trench excavatability
○ Stability of temporary excavations
○ Trench bottom stability
○ Modulus of soil reaction
○ Groundwater
○ Pipe backfill and compaction
○ Suitability of existing soils for use as backfill
materials
○ Soil corrosivity
○ Lateral bearing capacity and thrust block design
parameters
○ Seismic design parameters
○ Stormwater Infiltration
○ Pavement Design
• Geotechnical review of technical specifications for
adherence with the Geotechnical Investigation report
and the field conditions encountered during the
investigation. Sections to be reviewed will include
earthwork, foundations, pipeline backfill and concrete.

Subsequent to the review, NV5 will prepare a letter
indicating the results of the review.

Deliverables:

Draft and Final Geotechnical Report

DRAINAGE STUDY AND STORMWATER

MANAGEMENT PLAN
The NV5 team will utilize the information gathered from the previous tasks to prepare a drainage study of the
project area to determine the locations of deficiencies, if any, within the mainline storm drains located in Alondra Boulevard and W. Greenleaf Boulevard, as well as the local and collector street flow capacities, location of sumps, and extent of surface ponding locations along and adjacent
to S. Center Avenue. The hydrology and hydraulic analysis will utilize Los Angeles County Public Works criteria and methodology to evaluate existing drainage patterns and
storm drain pipes, surface runoff rates and volumes, and proposed storm drain catch basin and pipe design flow
rates. Hydrology calculations will utilize County-approved hydrology software such as the Watershed Modeling
System (WMS), XP-SWMM, or HydroCalc. Detailed storm
drain hydraulic calculations will be performed using the WSPG-W computer program.

If the original hydrology studies for the existing storm drain systems in Alondra Boulevard and Greenleaf Boulevard
cannot be located, hydrology studies will be conducted
to calculate expected peak 50-year flow rates within
these systems to evaluate existing condition hydraulic
grade lines, capacity, and potential flooding concerns.

The baseline analysis of the existing mainline storm drain will allow us to determine potential project impacts on the existing storm drain systems and potential need for upgrades.

Based on the existing topography and storm drain pipe
sizes in Alondra Boulevard and W. Greenleaf Boulevard, it is expected that a proposed storm drain system in Center Avenue will need to be split with connections to both the Alondra Boulevard and W. Greenleaf Boulevard storm
drains. Note that the as-built record drawings indicate that there should be an existing 39-inch RCP lateral stub-out at the intersection of S. Center Avenue and W. Greenleaf Boulevard (See Figure 7 on page 34).

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 33 D: PROJECT APPROACH & RESOURCES
Figure 7. S. Center Avenue Drainage Areas
The draft drainage study will inform the preliminary storm drain design including the preferred location and size of inlets, laterals, and mainline pipes along S. Center Avenue.

The draft drainage study will also evaluate the 85thpercentile, 24-hour storm event runoff volumes and peak flow rates to be used for the LID structural BMP design and documented in a Project Stormwater Management
Plan (SWMP). The SWMP will utilize an appropriate report template and identify the regional and project area surface and groundwater quality conditions, the minimum water
quality treatment requirements, and provide a stepwise approach for the selection of the recommended project LID structural BMPs, operation and maintenance
requirements and schedule for the BMPs. A variety of LID structural BMPs will be considered that will be specifically designed to capture and/or treat stormwater flow that
would otherwise contribute to the current flooding problem and water quality issues within Compton Creek. Potential LID BMPs consist of bio-retention/infiltration planters, flow through bio-filtration planters or swales; tree wells; dry wells; and permeable pavement. Selection of the LID BMPs and landscape vegetation will consider long-term
water quality treatment effectiveness, operation and
maintenance ease and costs, and aesthetic value within
the neighborhood.

Deliverables:

Draft and Final Hydrology and Hydraulics Reports; Draft and Final Stormwater Management Plan
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 34 D: PROJECT APPROACH & RESOURCES
CONCEPTUAL DESIGN (30% LEVEL PLANS)
Upon completion of the tasks above including draft
reports, the NV5 design team will prepare conceptual
design plans for City review and approval. The conceptual design plans will provide the conceptual design layout of the proposed storm drain system including catch basin/
inlet types, locations, and sizes; storm drain pipe locations and sizes; LID structural BMP types, locations, and sizing; conceptual landscape features and vegetation types;
and recommended street improvements. The 30% level
conceptual plans will also identify locations of potential temporary construction access easements, if required.

The objective of the 30% level conceptual plans is to allow project stakeholders to review and provide input on the main project construction element locations, types, and sizes, and to provide enough design level information
for environmental studies (CEQA analysis). It is currently anticipated that the project subsurface and surface design elements will be focused along S. Center Avenue and
Alondra Boulevard east of S. Center Avenue.

Based on an initial review of the Project area, the following are some key Project design considerations that will
require discussion and coordination with the City at the conceptual design level.
• S. Center Avenue south of Alondra Boulevard is a
relatively flat-sloped, narrow roadway and right-of-way, with no existing or continuous curb or gutter.
○ Early coordination with the City on the expected
street section is critical to the design of the storm
drain and LID BMP features.
○ This creates potential challenges for grading and
ADA requirements.
• Residential area construction along the narrow
roadway could require significant community and
resident notification, input, and interaction.
• Existing storm drain capacity of the main line in
Alondra Boulevard may be limited due to relatively
small pipe size with the flat slope. A proposed
storm drain system in S. Center Avenue will require
connections to both the Alondra Boulevard storm
drain and the W. Greenleaf Boulevard storm drain
systems to distribute the flows, so as to avoid overburdening either system, with the goal of avoiding any storm drain upsizing of either existing system,
especially including storm drain outfall modifications
that could trigger costly and lengthy environmental
analysis and permitting.

Deliverables:
30% Level Conceptual Design Plans and Cost Estimate
including the following sheets: Title, Notes, Survey/Topo, Demolition and Utility Relocations, Grading, Storm Drain Improvements, LID BMP details and landscape planting
palette, Street Improvements, Landscape Planting.

ENVIRONMENTAL COMPLIANCE (CEQA)
The City did not identify California Environmental Quality Act (CEQA) compliance as part of the Request for Proposal (RFP); however, it will be needed to complete this Project.

The following scope of work is provided assuming that
the City does not plan to prepare and process the CEQA
documents internally. Compass Consulting can lead the
CEQA environmental analysis if requested by the City.

The primary objectives of CEQA are to (1) inform decision makers and the public about the potential, significant
environmental effects of proposed projects and activities; (2) identify ways to avoid or mitigate environmental
damage; (3) avoid or reduce environmental impacts by
requiring implementation of an environmentally preferable alternative or feasible mitigation measures; and (4)
disclose to the public the reasons for approval of projects with significant environmental effects through the use of a statement of overriding considerations, where applicable. (CEQA Guidelines, § 15002.)
CEQA defines a “project” as an activity that (1) is a
discretionary action by a governmental agency and (2)
will either have a direct or reasonably foreseeable indirect impact on the environment. (Pub. Res. Code, § 21065.

The Center Avenue Green Street Storm Drain Project
is a discretionary project in that the City has discretion over the design, funding, and construction of the project.

The Project will have a direct and indirect impact on the environment in that it will require the construction of new storm drain pipelines and other facilities.

The required CEQA review process can result in
three different determination/document types — an
exemption, an Initial Study with Negative Declaration or Mitigated Negative Declaration (IS/ND or IS/MND), or
an Environmental Impact Report (EIR). The anticipated
significant impacts (or lack thereof) associated with the project governs the “level” of determination or document to be prepared.

The most common exemption under CEQA is the
Categorical Exemption (CE). The CEQA Guidelines (§§
15301-15333) list 33 categories (or classes) of projects that qualify for exemption. These classes are project types that are common and typically have no significant impacts associated with them. If a project fits within any of these classes, it can be considered categorically exempt and
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 35 D: PROJECT APPROACH & RESOURCES
generally needs no further CEQA analysis. It is important when assessing a potential project for a CE that the project “fit” directly within the confines of the intent of the CE. In general, modifications to existing facilities are covered by various CEs. The CEs most closely matching the Project
description include the following:
• Section 15301 - Class 1: Existing Facilities: Consists of the operation, repair, maintenance, permitting,
leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no
expansion of use beyond that existing at the time
of the lead agency’s determination. The types of
“existing facilities” itemized below are not intended
to be all-inclusive of the types of projects which might fall within Class 1. The key consideration is whether
the project involves negligible or no expansion of an
existing use. An example can be existing facilities
by both investor and publicly-owned utilities used to
provide electric power, natural gas, sewerage, or other public utility services.
• Section 15302 – Class 2: Replacement or
Reconstruction. Class 2 consists of replacement or
reconstruction of existing structures and facilities
where the new structure will be located on the
same site as the structure replaced and will have
substantially the same purpose and capacity as the
structure replaced.

There are instances, however, where a project may
not qualify for an exemption even if it fits into one of the 33 exempt classes. These are called exceptions to
the categorical exemptions. These exceptions apply to
projects that: are located in certain specified sensitive environments (applies only to Classes 3, 4, 5, 6, and
11); are located on a site included on any list compiled pursuant to California Government Code § 65962.5
(“Cortese List”); may damage scenic resources within
an officially designated state scenic highway; may
cause a substantial adverse change in the significance
of a historical resource; may have a significant effect on the environment due to unusual circumstances, or
may contribute to significant cumulative impacts (CEQA
Guidelines § 15300.2). To determine if an exception exists, technical studies are often prepared.

Given that the scope of work for the Project would add
sections of storm drain, and add low-impact development features, catch basins, etc., and because of the large area of the City affected by the Project, Compass, at this stage, does not believe that a Section 15301 – Class 1 Existing Facilities or Section 15302 – Class 2: Replacement or
Reconstruction Exemption would apply.

It should be noted that the final determination of the level of determination rests with the City as the Lead Agency.

Compass recommends that Public Works discuss with
City Planning the level of determination for this Project.

For proposal scoping purposes, the worst case scenario
of an Initial Study/Mitigated Negative Declaration is
assumed. If the City Planning Department agrees that an Exemption would be appropriate, Compass would adjust
the scope and cost accordingly and provide a reduced
scope of work and fee.

Additionally, because Caltrans is involved in funding,
it is unknown at this time what it may require for
environmental compliance. Compass will discuss with
Caltrans what it anticipates as being required for their CEQA compliance and coordinate its decision with the
City. As discussed, an Initial Study is the most “safe” assumption for the purposes of this RFP until it is
determined otherwise.

Task 1: Kick-off, Design Reviews, Site Visit, and
Project Description
The Project Description serves as the basis for all
of the CEQA documentation and any permitting.

A thorough Project Description helps the project
proceed smoothly and will ensure that the CEQA
documents and permitting are assessing the same
parameters. Compass will work with the clients and
the City to prepare a thorough Project Description
that will cover all aspects of the project design,
construction, and operations. Compass can also
assist with designing the project to avoid or minimize
potential impacts. Compass will attend a kick-off
meeting with the Project Team to finalize the Project
Description and document the environmental
conditions. Compass will prepare a Project Description
for use in the CEQA Initial Study.

This deliverable assumes one set of consolidated
revisions.

Task 2: Technical Studies
The Initial Study will require a number of studies to be prepared to support the analysis. Compass will rely on
the following studies prepared by the design team:
• Soils/Geotechnical
• Hydrology/Water Quality Management Plan
• Phase 1 Environmental Site Assessment –
hazardous waste (if applicable)
The following studies are also required to support
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 36 D: PROJECT APPROACH & RESOURCES
the Initial Study Analysis, and Compass proposes to
complete these studies.

It should be noted that even if a CEQA Exemption
is determined to be the acceptable compliance
documentation, that these technical studies would
still be required to ensure that there are no significant impacts.

1. Air Quality and Greenhouse Gas Assessment/
Energy – Subconsultant: MD Acoustics. This
study identifies the air quality and greenhouse gas
emissions that would be used during construction.

In general, the scope of services includes the
following:
• Evaluate the existing conditions of the project
study area; this will include gathering background
air quality data, local wind patterns in the study
area and identifying applicable rules, plans, and
thresholds of significance.
• Identify construction-related air quality impacts
from associated construction activities at the
project site which may include demolition, import/
export of fill dirt, mass grading, etc.
• Quantify and disclose greenhouse gas (GHG)
emissions that will be emitted as a result of
construction activity. The analysis will discuss
project design/mitigation measures that will help
reduce greenhouse gas emissions resulting from
the proposed project and determine if the project
has a significant impact on greenhouse gas
emissions.
• Summarize the results of the study in an air quality
and greenhouse gas evaluation report addressing
the potential impacts associated with the
development. These reports will also summarize
the recommended air quality and greenhouse gas
mitigation measures applicable to the proposed
project.

The CEQA Initial Study requires that energy
consumption of a project be analyzed. Therefore, an
energy consumption study for construction will be
performed.

2. Biological Resources Report – Subconsultant
Jennings Environmental. The Initial Study
requires the preparation of a Biological Resources
Assessment. Compass will prepare this report,
consistent with current standards. It should be
noted that an arborist-level survey is not included
at this time. The Biological Resources Report would
address the number of street trees that would need
further evaluation by an arborist to determine if the
excavation of new sewer lines would impact any Tree
Protection Zone. A line item for an arborist estimate
is provided in this task, but the actual costs and
scope would be based on a recommendation by the
biologist.

3. Cultural Resources Assessment/Paleontological
Resources Assessment – Subconsultant CRM
Tech. This task generally includes the following:
records searches (archaeological and historical,
paleontological), request of a sacred lands
file search from the Native American Heritage
Commission, a field survey, and a final report.

Native American tribal consultation will also be
required in accordance with AB52, but the City
will lead the consultation with the tribes. The
cultural resources study will include a search of
Native American resources to assist in the City’s
consultation.

4. Noise Study – Subconsultant: MD Acoustics
(Reserved). CEQA requires the identification of noise
from the project. At this time, based on the scope
of work in the RFP, there would be no pile driving
or other construction methods that would require
a noise study. Because the scope of work would
be developed during the design and engineering
phase, this line item is being reserved in the event
construction methods would require a construction
noise analysis.

Task 3: Prepare CEQA Initial Study

1. Administrative Draft Initial Study. Upon approval
of the Project Description by the Client, Compass
will prepare an Administrative Draft Initial Study for
the Project, using the latest 2024 CEQA checklist
with mitigation and supporting documentation as
required. The Administrative Draft includes a draft
and one set of revisions for Client review prior to
sending for review by the City.

Overall, the Initial Study will analyze the Project
under the following criteria, as required by the 2024
CEQA Checklist:
• Aesthetics
• Agriculture and Forestry
• Air Quality
• Biological Resources
• Cultural Resources
• Energy
• Geology and Soils
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 37 D: PROJECT APPROACH & RESOURCES
• Greenhouse Gases
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use /Planning
• Mineral Resources
• Noise
• Population and Housing
• Public Services
• Recreation
• Traffic and Circulation
• Tribal Cultural Resources
• Utilities
• Wildfire
• Mandatory Findings of Significance
Deliverable:

Administrative Draft Initial Study/Mitigated Negative
Declaration, assuming one round of consolidated
comments.

2. Screencheck Draft Initial Study. Once the Client
has approved the Administrative Draft Initial Study,
Compass will prepare a Screencheck Draft to the
City for City staff review and comment. Comments
will be incorporated into a second version of the
Screencheck Draft. Once the City approves the
Screencheck Draft, Compass will assemble the Final
Draft ISMND for public review. This task assumes
two sets of revisions from the City, including
revisions to technical studies if required.

3. Mitigation Monitoring and Reporting Program
(MMRP). The Screencheck Draft will include a
Draft Mitigation Monitoring and Reporting Program.

Compass will provide the MMRP to the client prior
to submittal to the City with the Screencheck Draft
Initial Study.

Task 4: Notices and Circulation for Public Review
Upon approval of the Final Draft ISMND for public review, Compass will finalize the document and prepare notices
for the City to conduct a 20- or 30-day public review,
depending on their direction. Compass assumes that
it will prepare the Notice of Intent, but the City would provide the mailing to all affected residents as well as provide a notice in the newspaper. This task includes the preparation of the Notice of Completion and the State
Clearinghouse Summary Form for the City’s submittal to
the State Clearinghouse. It should be noted that Compass can submit the documentation to the State Clearinghouse, however, the City Planning Department would need to
provide Compass access to the City’s State Clearinghouse account. Therefore, it is recommended that the Public
Works Department representative for this project obtain a contact in the City Planning Department to coordinate the public circulation submittal. Compass will work with the City to achieve the final results.

Task 5: Final Initial Study
Upon completion of the public review period, Compass will review any public comments received on the document
and discuss any substantive changes that should be made to the project or the ISMND as a result of the comments received. Compass will make any revisions to the ISMND
as determined necessary and prepare a Final ISMND
and Final MMRP. Compass will prepare the Notice of
Determination (NOD) to be filed with the County Clerk of the Board and State Clearinghouse. The final document is what the City would take to the Planning Commission and/ or City Council for approval.

Task 6: Project Management, Meetings,
and Public Hearing

1. CEQA Document Management. Compass
recommends our attendance at up to three meetings
with City staff throughout the project design and
environmental review process. This includes
coordination with the subconsultants and the Client
for Project revisions and questions and quality
assurance/quality control of subcontractor reports.

2. Project Management, Meetings and Coordination.

This task assumes attendance of up to 12 video
calls with the engineering team to finalize the
design and discuss revisions. In addition to meeting
attendance, project management activities will
include schedule management, and contract
management. Compass will coordinate with the City
and the applicant throughout the project to discuss
results of analyses, obtain additional information
as necessary, resolve any contract administration
issues, and provide schedule updates. This task
also assumes Compass’ attendance at one public
hearing to assist the City during the adoption of the
IS/MND.

The Project Engineer will provide all engineering data
in GIS format for use in graphic analysis.

3. Subconsultant Management. This task includes
coordinating subconsultants and reviewing/revising
their reports for client submittal.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 38 D: PROJECT APPROACH & RESOURCES

FINAL DESIGN
Once the City approves the conceptual design and the
Project has received a notice of determination under
CEQA, NV5’s design team will prepare the construction bid documents for 60%, 90%, and 100% submittal reviews
by the City. The construction bid documents will include detailed construction plans, technical specifications,
the engineer’s estimate of probable construction costs
(PS&E). The Plan packages will include 1”=40’ scale
design drawings and appropriate design details for existing utility, survey, and topographic base sheets, demolition and utility relocations, storm drain street improvements, LID structural BMPs, grading plans, landscape planting
and irrigation, traffic control and staging, temporary water pollution control, and log of borings.

The construction cost estimate will require frequent
updates as the design progresses to ensure that the unit price information is up to date based on the best available cost information and the project construction budget stays within the allocated Project funding.

Deliverables:
60%, 90%, 100% design level plans, specifications and
estimate in electronic format. Final signed hardcopy plans shall also be provided.

BID AND CONSTRUCTION
Bid Support
NV5 will assist the City with the preparation of Bid
Documents including: signed plans, specifications, and
cost estimate; geotechnical report; hydrology/hydraulics report; environmental studies; and environmental
permits. During the bidding process, NV5 will also prepare responses to the bidder’s questions as needed, and assist the City with the contractor selection process, as needed.

Deliverables:

1. Bid Package Materials (signed plans, specs,
estimate, reports, studies, permits – PDF format).

2. Responses to bidder’s questions (Word Document or
Excel File and PDF).

Engineering Services During Construction
NV5 will provide engineering support services during
construction including: response to requests for
information (RFIs); review of submittals/shop drawing;
prepare and process plan revisions; attendance at
construction meetings (as needed); preparation of as-built record drawings. This scope of work does not include NV5 construction management services or day-to-day on-site
deputy field inspection, monitoring, and reporting.

Deliverables:

1. RFI responses

2. Submittal/Shop drawing reviews

3. As-built record drawings
Optional Services
Construction Management Services: If requested, the
NV5 construction management team led by Luanne Bean
can provide a scope and fee for construction management services for consideration by the City.

Public Outreach: If requested, NV5 can prepare a scope
and fee to prepare and implement a construction phase
Public Outreach Plan and initiate outreach to address
community concerns and implement ways to minimize
construction impact. This could include meetings, mailers, and informational exhibits and fact sheet distribution.

ASSUMPTIONS AND EXCLUSIONS (NOT ALREADY

LISTED ABOVE)

1. Scope of work is based on Center Ave. Green Street
project fact sheet and Caltrans funding agreement
scope.
a. The scope of work does not include pavement
management assessment or recommendations for
the areas outside of the Center Ave and Alondra
storm drain/LID design and construction (refer to
pavement management studies)

2. Project Area per Center Avenue Project Information
Sheet ~ 150 ac drainage area.

3. No sewer house lateral work outside of right of way.

4. No permanent property acquisition.

5. All final construction elements are within existing
right of way. However, temporary access easements
may be required.

6. All Project costs including project construction,
management, design and permitting costs to be
within the $10M Caltrans funding limits.

7. NO modifications to existing storm drain outfalls
to Compton Creek (for permitting and schedule
reasons)

8. Pavement recommendation studies and design for
areas outside of the construction package limits are
excluded.

9. It is assumed that the S. Center Avenue street
section will remain similar to the existing condition
with road surface replacement in kind or per the
2024 PMP recommendations, with no continuous
curb and gutter construction south of Alondra Blvd,
unless requested by the City.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 39 E: PROJECT SCHEDULE & MANAGEMENT
Project Schedule and Management
A detailed Project schedule included on page 41 includes the expected durations of the scope tasks described above.

Note that the RFP includes a request that “the respondent shall demonstrate and provide specific examples of its ability to complete the design of a road reconstruction project of this size and nature within a predetermined schedule proved by the owner, which is 2 months as anticipated. Describe impact each alternate item would have on project schedule.” However, the RFP does not describe or indicate what the alternate items should include. A two-month design schedule does not appear to be feasible based on the nature of this Project which entails more than road reconstruction as it includes a significant storm drain and LID BMP design effort with associated data collection, reports, and environmental clearance. The schedule presented with this proposal provides our best and reasonable estimate of the likely Project schedule based on estimate hours, task duration, and critical path items.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 40 E: PROJECT SCHEDULE & MANAGEMENT
ID Task Name Duration Start Finish
1 Notice to Proceed 0 days Mon 2/10/25 Mon 2/10/25
2 Project Management 467 days Mon 2/17/25 Tue 12/1/26
3 Kick-Off Meeting 1 day Mon 2/17/25 Mon 2/17/25
4 Monthly Meetings 456 days Tue 3/4/25 Tue 12/1/26
27 Data Collection & Review 30 days Mon 2/24/25 Fri 4/4/25 28 Office 15 days Mon 2/24/25 Fri 3/14/25
29 Field 15 days Mon 3/17/25 Fri 4/4/25
30 Survey & Topo 34 days Tue 4/8/25 Fri 5/23/25
31 Office Work 5 days Tue 4/8/25 Mon 4/14/25
32 Field & Aerial 29 days Tue 4/15/25 Fri 5/23/25
33 Utility Research & Mapping 34 days Tue 4/8/25 Fri 5/23/25 34 NV5 Research 14 days Tue 4/8/25 Fri 4/25/25
35 AirX 19 days Tue 4/29/25 Fri 5/23/25
36 Geotechnical Study 63 days Tue 4/8/25 Thu 7/3/25
37 Research 9 days Tue 4/8/25 Fri 4/18/25
38 Field Investigation 20 days Mon 4/21/25 Fri 5/16/25
39 Review & Analysis 20 days Mon 5/19/25 Fri 6/13/25
40 Draft Report 14 days Mon 6/16/25 Thu 7/3/25
41 Drainage & SWMP 65 days Tue 4/8/25 Mon 7/7/25
42 Existing H&H 20 days Tue 4/8/25 Mon 5/5/25
43 Conceptual H&H 25 days Tue 5/6/25 Mon 6/9/25
44 Draft H&H / SWMP 20 days Tue 6/10/25 Mon 7/7/25
45 Conceptual Design 105 days Mon 6/2/25 Fri 10/24/25
46 Plans 70 days Mon 6/2/25 Fri 9/5/25
47 Estimate 5 days Mon 9/8/25 Fri 9/12/25
48 City Review 10 days Mon 9/15/25 Fri 9/26/25
49 Concept Revisions 20 days Mon 9/29/25 Fri 10/24/25
50 Environmental (CEQA) 120 days Mon 10/27/25 Fri 4/10/26 51 Kick-off 1 day Mon 10/27/25 Mon 10/27/25
52 Technical Studies 20 days Tue 10/28/25 Mon 11/24/25
53 CEQA Initial Study 60 days Tue 11/25/25 Mon 2/16/26
54 Admin Draft Initial Study 20 days Tue 11/25/25 Mon 12/22/25 55 Screencheck Draft Initial Study 10 days Tue 1/20/26 Mon 2/2/26 56 MMRP 10 days Tue 1/20/26 Mon 2/2/26
57 Final Draft IS 5 days Tue 2/10/26 Mon 2/16/26
58 Notices & Public Review 20 days Tue 2/17/26 Mon 3/16/26 59 Final Initial Study 19 days Tue 3/17/26 Fri 4/10/26
60 Updates 15 days Tue 3/17/26 Mon 4/6/26
2/10

D J F M A M J J A S O N D J F M A M J J A S O N D J
Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress

Page 1 ends

Project: Compton-CenterAve-R
Date: Mon 12/2/24
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 41 E: PROJECT SCHEDULE & MANAGEMENT
ID Task Name Duration Start Finish
61 NOD 4 days Tue 4/7/26 Fri 4/10/26
62 Final Design 170 days Mon 4/13/26 Fri 12/4/26
63 60% PS&E 60 days Mon 4/13/26 Fri 7/3/26
64 City Review 60% 10 days Mon 7/6/26 Fri 7/17/26
65 90% PS&E 40 days Mon 7/20/26 Fri 9/11/26
66 City Review 90% 10 days Mon 9/14/26 Fri 9/25/26
67 100% PS&E 30 days Mon 9/28/26 Fri 11/6/26
68 City Review 100% 10 days Mon 11/9/26 Fri 11/20/26
69 Final Plans 10 days Mon 11/23/26 Fri 12/4/26
70 Bid & Construction (TBD)

D J F M A M J J A S O N D J F M A M J J A S O N D J
Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026 Half 1, 2027 Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress

Page 2 ends

Project: Compton-CenterAve-R
Date: Mon 12/2/24
Client Name | Project Name NV5 | 42

COST PROPOSAL & ESTIMATED FEE
Cost Proposal and Estimated Fee
A cost proposal is provided starting on page 44 that identifies cost components by task, staff classification and hourly rate, and is summarized and totaled as “Not-to-Exceed.” The cost proposal includes a spreadsheet detailing hours by position for the tasks described above, with subtotals by task and the overall total fee estimate. Note that the RFP requested separate fees associated with two alternate items, however, these two alternate items were not described in the RFP. The Conceptual Design task includes hours to evaluate drainage and LID structural BMP design options with a recommended option to be advanced with the 30% conceptual design submittal.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 43

COST PROPOSAL & ESTIMATED FEE
Project Name: Center Avenue Green Street and Storm Drain Project Number:

Client/Owner: City of Compton
Project Manager: Matthew Moore
Prepared By: Matthew Moore
Proj/Prop No.:

Date: December 3, 2024

ITEM TOTAL
1 Project Management $34,412
2 Data Collection and Review $20,928
3 Survey and Topography $65,705
4 Utility Research and Mapping $55,978
5 Geotechnical Study $82,153
6 Drainage Study and Stormwater Plan $44,240
7 Conceptual Design (30%) $227,208
8 Environmental Compliance (CEQA) $80,000
Subtotal Conceptual Design $576,212
9 Final Design $305,558
10 Bid and Construction Support $29,506
Other Direct Costs $3,500
TOTAL NOT-TO-EXCEED FEE $949,188
$86 $141
$95 $166
$105 $183
$111 $193
$128 $198
$150
$165
$167
$198
$155
$330
$132 $445
$150 $240
$170
$185
$240
$240
$250
$270

1.10 x Cost

1.10 x Cost
$400
CA Office: 163 Technology Drive, Suite 100, Irvine, CA 92618

1.10 x Cost
Per Accepted
IRS Rate
SURVEYING:

Construction Manager - FSCM
Survey Manager - FSSM
3-Person Survey Crew - FS3P
2-Person Survey Crew - FS2P
Principal - OSPP
Associate - OSAP
Engineering Aid/Planning Aid - OSEPA
TECHNICAL SERVICE:

OFFICE SERVICES:

CADD Technician III - OSCT3
Junior Field Engineer - FSJFE
Assistant Field Engineer - FSTFE
Associate Field Engineer - FSEFE
CADD Technician I - OSCT1 Senior Field Engineer - FSSFE Project Administrator - OSPAD
Project Assistant - OSPA
Other Expenses-Including Subconsultants &
Purchased Services Through Subcontracts - EOTH
Milage - Outside Local Area - EMIL
Litigation Support - ELIT
Design Supervisor - OSDS
Subsistence - ESUB
Plotting and In-House Reproduction - EPHP
Structural Engineer - OSSTP
Manager - OSMP
EXPENSES:

Senior Engineer/Planner/Surveyor - OSSP
Associate Engineer/Planner/Surveyor - OSEEP
Assistant Engineer/Planner/Surveyor - OSTSP
CADD Technician II - OSCT2
Junior Engineer/Planner/Surveyor - OSJP
PROFESSIONAL:

FEE SUMMARY

BASIC BILLING RATES
FIELD SERVICES:

CONSTRUCTION MANAGEMENT:
1-Person Survey Crew - FS1P
1-Person Survey Crew (GPS)(Robotic) - FS1R
Senior CADD Technician/Designer - OSSCT
FILE: 20241202_FEE_Compton_CenterAve_GreenSt_v2.xlsm
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 44

COST PROPOSAL & ESTIMATED FEE
NV5 Page 1 of 4
Phase Task Task/Sub OSPP OSAP OSMP OSSP OSEEP OSTSP OSCT2 PSPE PSSE PSPR FSSM FS2P HOURS FEE $270 $250 $240 $185 $170 $150 $128 $245 $185 $135 $240 $330

1.00 Project Management

1.1 Project Meetings 2 6 24 8 8 24 4 4 4 2 86 $16,512

1.2 Monthly Invoicing and Reporting 24 24 $5,760

1.3 PM Coordination 2 8 40 50 $12,140
Subtotal 160 $34,412

2.00 Data Collection and Review

2.1 Office Data Collection and Review 4 4 24 16 48 $7,288

2.2 Field Review and Data Collection 8 8 32 32 80 $13,640 Subtotal 128 $20,928

3.00 Survey and Topography
3-1.1 Project Research 1 4 2 7 $1,250
3-1.2 Horizontal, Vertical, Boundary Control, Aerial Targets 2 20 22 $7,080 3-1.3 Topographic Design Survey 10 24 16 100 150 $42,140 3-2.1 Aerial Topography Survey (RJ Lung & Assoc) 0 $15,235 Subtotal 179 $65,705

4.00 Utility Research and Mapping

4.1 NV5 Research, Coordination, & Mapping 2 2 4 16 16 40 $5,978

4.2 Utility Research and Mapping (AirX) 0 $50,000
Subtotal 40 $55,978

5.00 Geotechnical Study

5.1 Geotechnical Project Management 8 12 20 $3,100

5.2 Geotechnical Analysis and Report 4 16 48 68 $10,420

5.2.1 Geotechnical Subs, Lab, Fees (See Separate Sheet) 0 $68,633 Subtotal 88 $82,153
OSPP OSAP OSMP OSSP OSEEP OSTSP OSCT2 PSPE PSSE PSPR FSSM FS2P TOTAL - THIS PAGE 4 14 102 18 59 124 36 4 28 64 22 120 595 $259,176 TOTAL - ALL PAGES 6 154 230 346 533 1638 1340 6 32 74 32 120 4,511 $945,688 TOTAL COST BY LABOR CATEGORY $1,620 $38,500 $55,200 $64,010 $90,610 $245,700 $171,520 $1,470 $5,920 $9,990 $7,680 $39,600 Center Avenue Green Street and Storm Drain,

PAGE TOTALS

TASK DESCRIPTION LABOR CODE/STAFF HOURS TOTALS
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 45

COST PROPOSAL & ESTIMATED FEE
NV5 Page 2 of 4
Phase Task Task/Sub OSPP OSAP OSMP OSSP OSEEP OSTSP OSCT2 PSPE PSSE PSPR FSSM FS2P HOURS FEE $270 $250 $240 $185 $170 $150 $128 $245 $185 $135 $240 $330

6.00 Drainage Study and Stormwater Plan

6.1 Existing Conditions Hydrology 4 40 44 $6,680

6.2 Existing Conditions Hydraulics 4 40 44 $6,680

6.3 Conceptual Phase Proposed Hydrology 4 20 24 $3,680

6.4 Conceptual Phase Proposed Hydraulics 4 20 24 $3,680

6.5 Conceptual Phase LID BMP Design 4 16 20 $3,080

6.6 Conceptual Phase Draft Hydrology & Hydraulics Report 1 1 4 8 14 $2,305

6.7 Conceptual Phase Draft Stormwater Management Plan 1 1 4 8 14 $2,305

6.8 Final Design Phase Hydrology and Hydraulics 4 40 44 $6,680

6.9 Final Design Phase LID Design 4 16 20 $3,080

6.10 Final Design Phase Hydrology & Hydraulics Report 1 1 4 16 22 $3,505

6.11 Final Design Phase SWMP 1 1 2 12 16 $2,565
Subtotal 286 $44,240

7.00 Conceptual Design (30%)

7.1 Base Sheets (Title, Notes, Survey, Topo) 2 2 2 16 60 80 162 $23,310

7.2 Demolition and Utility Relocations 4 4 8 24 70 80 190 $28,260

7.3 Grading 2 2 2 24 80 80 190 $27,670

7.4 Storm Drain Improvemetns 4 4 8 60 100 80 256 $38,880

7.5 LID BMP Details 4 4 16 20 60 60 164 $25,000

7.6 Street Improvements 8 8 16 40 80 80 232 $35,920

7.7 Landscape 8 8 16 40 100 80 252 $38,920

7.8 Construction Cost Estimate 2 2 4 4 32 16 60 $9,248
Subtotal 1506 $227,208
OSPP OSAP OSMP OSSP OSEEP OSTSP OSCT2 PSPE PSSE PSPR FSSM FS2P TOTAL - THIS PAGE 0 34 38 76 270 818 556 0 0 0 0 0 1,792 $271,448 TOTAL - ALL PAGES 6 154 230 346 533 1638 1340 6 32 74 32 120 4,511 $945,688 Center Avenue Green Street and Storm Drain,

PAGE TOTALS

TASK DESCRIPTION LABOR CODE/STAFF HOURS TOTALS
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 46

COST PROPOSAL & ESTIMATED FEE
NV5 Page 3 of 4
Phase Task Task/Sub OSPP OSAP OSMP OSSP OSEEP OSTSP OSCT2 PSPE PSSE PSPR FSSM FS2P HOURS FEE $270 $250 $240 $185 $170 $150 $128 $245 $185 $135 $240 $330

8.00 Environmental Compliance (CEQA) 0 $80,000
8-1 Kick-off, Design Reviews, Site Visit, and Project Desc. 8-2.1 Air Quality and Greenhouse Gas
8-2.2 Biological Resources
8-2.3 Cultural/Paleontological Resources
8-2.4 Noise Study
8-3 CEQA Initial Study
8-3.1 Administrative Draft Initial Study
8-3.2 Screencheck Draft Initial Study
8-3.3 Mitigation Monitoring and Reporting Program
8-4 Notices and Circulation for Public Review
8-5 Final Initial Study
8-6 Project Management, Meetings and Public Hearing
Subtotal 0 $80,000
OSPP OSAP OSMP OSSP OSEEP OSTSP OSCT2 PSPE PSSE PSPR FSSM FS2P TOTAL - THIS PAGE 000000000000 0 $80,000
TOTAL - ALL PAGES 6 154 230 346 533 1638 1340 6 32 74 32 120 4,511 $945,688

PAGE TOTALS

TASK DESCRIPTION LABOR CODE/STAFF HOURS TOTALS
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 47

COST PROPOSAL & ESTIMATED FEE
NV5 Page 4 of 4
Phase Task Task/Sub OSPP OSAP OSMP OSSP OSEEP OSTSP OSCT2 PSPE PSSE PSPR FSSM FS2P HOURS FEE $270 $250 $240 $185 $170 $150 $128 $245 $185 $135 $240 $330

9.00 Final Design

8.1 60%, 90%, 100% PS&E Submittals
Title & General Notes Sheets (4) 1 1 2 16 16 36 $5,308
Survey Control and Boundary Map (2) 1 1 2 4 4 16 8 36 $6,108 ROW and TCE Sheets (2) 4 2 2 8 20 40 76 $11,330
Existing Utility Plan (8) 1 1 2 4 12 16 36 $5,388
Utility Relocation Plan (8) 4 4 8 16 40 72 $10,960
Demo, Site Prep Plans (8) 2 2 8 16 40 68 $9,980
Rough Grading Plan (8) 2 2 8 40 60 112 $16,140
Detail Grading (4) 2 2 8 60 60 132 $19,140
Construction Details (2) 1 1 4 4 40 40 90 $13,030
Storm Drain Plan & Profile (12) 8 12 40 44 60 80 244 $39,000 Street Improvements (12) 16 8 40 40 60 80 244 $39,360
Temp Traffic Control (12) 16 4 40 80 40 180 $29,480
Landscape Planting & Irrigation (20) 16 20 40 60 80 80 296 $48,640 Erosion & Sediment Control (10) 1 1 8 40 40 90 $13,090
Boring Logs (1) 1 1 8 1 1 2 14 $2,214

9.2 Specifications 16 8 12 16 60 1 1 4 118 $20,830

9.3 Cost Estimate 8 4 8 40 40 100 $15,560
Subtotal 1944 $305,558

10.00 Bid and Construction Support

10.1 Bid Support 2 2 8 8 8 12 12 2 4 2 60 $10,526

10.2 Engineering Services During Construction 4 8 12 16 40 40 120 $18,980 Subtotal 180 $29,506
OSPP OSAP OSMP OSSP OSEEP OSTSP OSCT2 PSPE PSSE PSPR FSSM FS2P TOTAL - THIS PAGE 2 106 90 252 204 696 748 2 4 10 10 0 2,124 $335,064 TOTAL - ALL PAGES 6 154 230 346 533 1638 1340 6 32 74 32 120 4,511 $945,688 Center Avenue Green Street and Storm Drain,

PAGE TOTALS

TASK DESCRIPTION LABOR CODE/STAFF HOURS TOTALS
City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 48

COST PROPOSAL & ESTIMATED FEE
Sr. Staff Engineer/Geologist 12 hrs. @ $135.00 hr. $1,620.00 Senior Engineer/Geologist 8 hrs. @ $185.00 hr. $1,480.00 LA County Boring Permit Fees 1 LS @ $406.00 LS $406.00
Compton ROW Permit Fees 1 LS @ $672.50 LS $672.50
Private Utility Clearance (GPRS) 1 LS @ $2,700.00 LS $2,700.00 Truck Charge 1 days @ $120.00 day $120.00
FIELD EXPLORATION (1 mobilizations- 2 Days)
Drilling Subcontractor- HSA borings 1 LS @ $18,000.00 LS $18,000.00 Mob/Per Diem 4 days @ $250.00 LS $1,000.00
Sr. Staff Engineer/Geologist 24 hrs. @ $135.00 hr. $3,240.00 Senior Engineer/Geologist 12 hrs. @ $185.00 hr. $2,220.00 Truck Charge 4 days @ $120.00 day $480.00
Traffic Control Subcontractor 4 days @ $2,300.00 day $9,200.00 Percolation Testing- Sr. Staff Engineer/Geologist 24 hrs. @ $135.00 hr. $3,240.00 Percolation Testing- Materials and Rental 1 LS @ $1,000.00 LS $1,000.00

LABORATORY TESTING
Moisture Content & Dry Unit Weight 25 tests @ $42.00 ea. $1,050.00 Sieve Analysis 15 tests @ $135.00 ea. $2,025.00
Atterberg Limits 15 tests @ $160.00 ea. $2,400.00
Sand Equivalent 3 tests @ $100.00 ea. $300.00
Expansion Index 3 tests @ $170.00 ea. $510.00
Direct Shear 2 tests @ $270.00 ea. $540.00
pH and Resistivity 3 tests @ $180.00 ea. $540.00
Sulfate Content 3 tests @ $85.00 ea. $255.00
Chloride Content 3 tests @ $85.00 ea. $255.00
R-Value 3 tests @ $340.00 ea. $1,020.00
HOT PATCHING (One Mobilization 2 Days)
Mob/Per Diem 1 days @ $250.00 LS $250.00
Sr. Staff Engineer/Geologist 24 hrs. @ $135.00 hr. $3,240.00 Senior Engineer/Geologist 8 hrs. @ $185.00 hr. $1,480.00 Truck Charge 2 days @ $120.00 day $240.00
Traffic Control Subcontractor 2 days @ $2,300.00 day $4,600.00 Hot Patching Subcontractor (Joe's) 9 each @ $850.00 each $7,650.00

ANALYSIS AND REPORT
Sr. Staff Engineer/Geologist 48 hrs. @ $135.00 hr. $6,480.00 Senior Engineer/Geologist 16 hrs. @ $185.00 hr. $2,960.00 Senior Principal Engineer 4 hrs. @ $245.00 hr. $980.00
$82,153.50

ESTIMATED BREAKDOWN OF COST

GEOTECHNICAL INVESTIGATION
S. Center Ave and Alondra Blvd Storm Drain Improvements Compton, California

SITE RECONAISSANCE, MARKOUT, PRIVATE UTILITY CLEARANCE, ROW PERMITS, PRE-CON MEETING AND

PROJECT MANAGEMENT
Total Estimated Cost for Main Geotechnical Investigation City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 49

COST PROPOSAL & ESTIMATED FEE
NV5 Direct Costs
Phase Task Type Quantity Unit Unit Cost Cost
1 1B Site Meeting With Utility Vendors 40 MILES $0.67 $26.80 3 3A Kick-off Meeting, 4 In-person mtgs 373 MILES $0.67 $249.91 4 4D Meetings with City Staff (3 in person) 240 MILES $0.67 $160.80 4 4E Site Visits (2) 160 MILES $0.67 $107.20
4 4A 30% 24x36 Hardcopies (~60shts/set) 120 PLOTS $3.00 $360.00 4 4A 60% 24x36 Hardcopies (~100 shts/set) 200 PLOTS $3.00 $600.00 5 5A 90% 24x36 Hardcopies (~120 shts/set) 240 PLOTS $3.00 $720.00 5 5B 24x36 Mylars (~120 shts/set) 120 PLOTS $10.00 $1,200.00 5 5B 8.5 x 11 Hardcopy Specs & Estimate 500 COPIES $0.15 $75.00 TOTAL $3,500
Center Avenue Green Street and Storm Drain,

DESCRIPTION TOTALS
NV5 6/16 20241202_FEE_Compton_CenterAve_GreenSt_v2.xlsm - 12/3/2024 City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 50

COST PROPOSAL & ESTIMATED FEE
Project Name: Center Avenue Green Street and Storm Drain Project Number:

Client/Owner: City of Compton
Project Manager: Matthew Moore
Prepared By: Matthew Moore
Proj/Prop No.:

Date: December 3, 2024
Task Fee Assumptions
Design 1.       Scope of work is based on Center Ave Green Street project fact sheet and Caltrans funding agreement scope. a.       The scope of work does not include pavement management assessment or recommendations for the areas outside of the Center Ave and Alondra storm drain/LID design and construction (refer to pavement management studies)

2.       Project Area per Center Ave Project Information Sheet ~ 150 ac drainage area.

3.       No sewer house lateral work outside of right of way.

4.       No permanent property acquisition.

5.       All final construction elements within existing right of way. However, temporary access easements may be required.

6.       All Project costs including project construction, management, design and permitting costs to be within the $10M Caltrans funding limits.

7.       NO modifications to existing storm drain outfalls to Compton Creek (for permitting  and schedule reasons)

8.       Pavement recommendation studies and design for areas outside of the construction package limits are excluded.

9.       It is assumed that the S. Center Avenue street section will remain similar to the existing condition with road surface replacement in kind or per the 2024 PMP recommendations, with no continuous curb and gutter construction south of Alondra Blvd.

10. Up to 15 utility pothole locations were assumed for budgeting purposes.

11. Connections to the Los Angeles County Flood Control District (LACFCD) storm drain facilities will require coordination and permitting.  Hours have been allocated for LACFCD permit processing, however, it is assumed that the permit fees will be paid by the City, since the permit fee amounts are not currently known.

12. Up to 10 RFIs and 10 submittal reviews are assumed for construction phase engineering design support.

Survey

1. This proposal and fee presume that NV5 will be allowed access to the site during normal working hours and the Notice to Proceed will include all areas included in the contract.

2. This proposal excludes utility, research, mark-out and potholing. Only surface appurtenances of existing utilities will be surveyed.

3. Filing/recording any Records of Survey or Corner Records is excluded from the fixed fee portion of this proposal.

4. No property corners will be set as part of this survey.

5. Plotting of easements is excluded from this proposal.

6. No title reports are to be reviewed as a part of this proposal.

7. Areas blocked by parked vehicles or other obstructions will be excluded from this survey.

8. This scope and fee do not provide information of existing pavement conditions, damaged sidewalks, damaged curb and gutters, or red curb locations.

9. Pothole locations are excluded from this proposal.

10. Any item not specifically included in this proposal is specifically excluded.

11. This project is a Prevailing Wage project
Geotechnical
NV5’s geotechnical engineering services will be performed using the degree of care and skill ordinarily exercised under similar soil circumstances by a registered geotechnical engineer with experience in the southern California area. No other warranty either express or implied will be made as to the conclusions and professional advice issued as a result of the proposed evaluation. NV5 services do not include an evaluation of the presence of hazardous materials or contaminated soils. If such materials are encountered or are suspected during the field reconnaissance, you will be notified immediately. Final assessment of the site conditions should be considered a professional opinion based on data obtained.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 51

COST PROPOSAL & ESTIMATED FEE
Project Name: Center Avenue Green Street and Storm Drain Project Number:

Client/Owner: City of Compton
Project Manager: Matthew Moore
Prepared By: Matthew Moore
Proj/Prop No.:

Date: December 2, 2024
Client Project Manager: - Kofi Sefa-Boakye Ph. #:

NV5 Project Manager: - Matt Moore Ph. #: 858-922-4889
Job Code Job Description Phone Number
OSPP - Principal - Jeff Cooper
OSAP - Associate -
Tamara O'Neal
David Niknafs
Luanne Bean
OSMP - Manager - Matthew Moore
OSSP - Senior Engineer/Planner/Surveyor -
Padma Asam (Civil);
Jennifer Peterson (Civil)
Mike Smyth (Landscape)
Andrea Thomas (Civil);
OSEEP - Associate Engineer/Planner/Surveyor -
Tom Grace (Civil)
Art Biscocho (Civil)
Brad Shin (Civil)
Matthew Ronquillo (Civil)
OSTSP - Assistant Engineer/Planner/Surveyor - Harsho Sanyal (Civil) Sarah Seitz (Civil)
OSCT2 - CADD Technician II - TBD
PSPE - Sr Principal
Engineer/Geologist/Professional - Carl Henderson
PSSE - Senior Engineer/Geologist/Professional - Paul Cunningham PSPR - Sr. Staff Engineer/Geologist - Drew McPeak
FSSM - Survey Manager - J Braley
FS2P - 2-Person Survey Crew - TBD
Employee Name
CA Office: 163 Technology Drive, Suite 100, Irvine, CA 92618

PERSONNEL
Project Manager
Employee List
FILE: 20241202_FEE_Compton_CenterAve_GreenSt_v2.xlsm City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 52

CONSULTANT AGREEMENT
NV5 will execute the contract according to the City’s standard consultant agreement and takes no exception to the City’s contractual requirements.

City of Compton | Center Avenue Green Street & Storm Drain Improvements NV5 | 53 February 4, 2025
TO: HONORABLE MAYOR AND COUNCIL MEMBERS
FROM: CITY MANAGER
SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO A FIVE-YEAR

AGREEMENT WITH AND ISSUE A PURCHASE ORDER TO ENVISIO

FOR INTERNAL-AUDIT-REPORTING SOFTWARE SERVICES AND

OPTIONAL PERFORMANCE METRIC REPORTING SOFTWARE
SERVICES ($151,095).

SUMMARY
Adoption of this resolution will authorize the City Manager to enter into a five-year agreement and issue a purchase order to Envisio for software services related to internalaudit-reporting and for performance metrics software services ($151,095).

BACKGROUND
The City of Compton Single Audit Report of Fiscal Year 2019-2020 stated the following (below) audit findings and recommendations related to Internal Audit Operations of the City:

Audit Finding #2014-118B – Information:

Criteria: Development or revision of information systems is based on the strategic plan linked to the entity’s overall strategy, and is responsive to achieving City-wide objectives.

Recommendation: We recommend the City have development or revision of information systems based on the City’s overall strategy. These systems should also be responsive to achieving City-wide objectives.

Audit Finding #2014-119B – Information:

Criteria: Management supports the development of necessary information systems and shows its support by committing appropriate resources.

Recommendation: We recommend that City Management support the development of necessary information systems, including committing appropriate resources.

Audit Finding #2014-126B – On Going Monitoring:

Criteria: Communications from external parties are corroborated with internally generated data and able to indicate problems with internal control.

Condition: Internal Control issues noted in prior years’ reviews and audits had not been addressed by management. – SCO Finding 14:

Recommendation: We recommend the City adopt formal governance processes and procedures to provide appropriate oversight of internal audit functions and activities, and respond in a timely manner to recommendations.

7. Staff Report
Envisio
February 4, 2025
2 Audit Finding #2014-133B – Separate Evaluation:

Criteria: The evaluations are conducted by the City Auditor’s Office, who has sufficient resources, ability, and independence
Condition: The City does not have a City Auditor’s Office Recommendation: We recommend that once an internal control unit has been established that the City ensures that they have the necessary resources, ability, and independence.

Audit Finding #2014-136B - Report Deficiencies:

Criteria: Deficiencies are reported to the person directly responsible and to a person at least one level higher.

Condition: Deputy Treasurer admitted to embezzling money from the City’s cash receipts on 12/15/16. The Mayer Hoffman McCann CPA firm reported that it was unable to reach an opinion n whether the City’s FY2010-11 June financial statements were free of material misstatements, due to their inability to obtain sufficient evidence from the Mayor or the City with respect to the Mayor’s concerns of fraud on 7/24/12. Governance practices recommended by the FY2011-12 Civil Grand Jury Report were not implemented, such as: develop a strategic plan, develop and report on performance measures, develop specific goals for the City’s executive and conduct annual evaluation of City’s executive.

The City Council failed to exercises oversight over the City’s financial and operational activities. Prior years’ audit and review finding and recommendation were not implemented. Related Finding SCO 3, 7, 17.

Recommendation: We recommend that issues and deficiencies are directly communicated to the Responsible Personnel and elevated to someone at least a level higher.

Audit Finding #2014-137B – Report Deficiencies:

Criteria: The identified transactions or events are investigated to determine causes and correct problems:

Condition: Prior years’ audit and review issues had not been corrected. SCO Finding 17.

Recommendation: We recommend the City develop a priority schedule of the identified audit findings and establish an estimated completion date to allow the City to focus on the items that need more immediate attention. Going forward, we recommend that an audit committee be responsible overseeing the response to audit findings and the implementation of the City’s corrective action plans.

Audit Finding #2014-110B – Common Categories of Control Activities:

Criteria: Managers review performance reports
Recommendation: We recommend that City Management review performance reports to gain an understanding where additional training or other corrective actions are necessary.

Other audit findings that are related are:

Audit finding # 2014 – 102B Risk Identification, #2014 – 103B Risk Identification, #2014- 104B – Risk Identification, #104-124B – On-going Monitoring, #2014-134B Separate Evaluation; #2014-135B Report Deficiencies; Audit Finding #2014-086B – Management Staff Report
Envisio
February 4, 2025
3 Philosophy and Operating Style; Audit Finding #2014-100B – Risk Identification; Audit Finding #2014-129B – On-going Monitoring; Audit Finding #: 2014-065A (Also SCO Finding 17); Audit Finding #2014-121B – Communication; #2014-088B – Management Philosophy and Operating Style; Audit Finding #2014-123B – Communication; Audit Finding #2014-101B – Risk Identification;
The City needs technical expertise to advance the goals and policies of the Mayor and Council in order to actively respond, implement, and report the status of corrective action or of City department performance metrics.

The Single Audit report itself was approximately 239 pages, which included approximately 227 pages of audit findings related to a variety of operational areas of the City. The findings spanned various departments and activities of the City as well, and spanned various responsible parties tasked with implementing corrective action plans.

Although many of the corrective actions plans have been implemented or are still in progress, staff recommends that the proper organization of the findings, corrective action plans, and progress related to the Single Audit, or related to any other audit of the City, should be made available electronically, and in an organized fashion, to those responsible for oversight, evaluation, and testing. Many of the recommendations shown above also support the need for greater communication and greater effectiveness in oversight in regards to corrective action plans and audit findings.

Due to this need, City Controller staff searched for a software platform capable of organizing the City’s various audit findings across multiple audits, which would also be able to report, sort, and filter on the following attributes of those audit findings:
 Finding Number and Title
 Criteria
 Condition
 Recommendation
 Cause
 Effect
 Repeated Finding (Y/N)
 Recommendation
 City’s Response
 Corrective Action Plan
 Planned Implementation Date
 Responsible Persons
 Auditor comment on Corrective Action Plan Progress
 City’s comment on Corrective Action Plan Progress
Currently, the data regarding these audit findings is only contained in a report which cannot be sorted or filtered. Additionally, the existing report is not flexible or tailorable for Staff Report
Envisio
February 4, 2025
4 varied audiences. Also as time progresses, and corrective action plans get implemented, the past audit findings get omitted from newer reports.

However, due to the high turnover of staff at the City, it is important for all audit findings, and their corrective action plans to be organized and continuously evaluated and monitored in a user-friendly reporting format. This will assist the City and staff to prevent repeated audit findings, or prevent new audit findings in the future. It will also assist in City-resource-planning to identify areas of high risk.

Additionally, the City is also in need of an organized data gathering and reporting platform for Departmental Performance Metrics reporting. Per Audit Finding #2014-110B – Common Categories of Control Activities, the Auditor has recommended that City Management review performance reports to gain an understanding of where additional training or other corrective actions are necessary. City Management monitoring of performance metrics allows for risk identification and increased levels of communication between departments and City Management.

STATEMENT OF THE ISSUE
City staff in the Controller’s office have reached out for quotes from vendors who could possibly provide a software solution to organize and provide reporting on the City’s various audit findings, corrective action plans, performance metrics, and their attributes that need a user-friendly-reporting mechanism. Staff searched Planet Bids library and website, and Google for suitable software.

The vendors contacted were: Responsiveness
 Auditfindings.com No license in California, not responsive  isoTracker Solutions Ltd Software for auditing only, not audit finding reporting, not responsive
 PPC’s Workpapers for Local Governm Software for auditing only, not audit Thompson Reuters finding reporting, not responsive
 My Audit Spot Platform Not Based in the USA, no customer services, not responsive
 Envisio Bid received, responsive to City’ s needs
The search for this specialized reporting software ended with Envisio, after contacting various other possibilities that were not responsive to the City’s needs. Envisio Solutions Inc. is a cloud-based Strategic Planning, Performance Management, Project Management & Reporting Software for government agencies. Their proprietary software and services provide unique capabilities not offered elsewhere. Envisio Solutions Inc. is the sole vendor offering a specialized solution designed for the public sector and Staff Report
Envisio
February 4, 2025
5 government agencies. The software also has a Proprietary aggregation algorithm ensuring real-time updates and visual representation of progress and status.

The cost of the Envisio software for audit finding organization and reporting, with optional services for performance metrics development and platform build is as follows:

Audit Finding Organization and Reporting
Year 1 Price
Annual Software Subscription + One-time Professional Services $18,500 USD
Year 2 Price
Annual Software Subscription (includes 5% annual increase) $15,225 USD
Year 3 Price
Annual Software Subscription (includes 5% annual increase) $15,986 USD
Year 4 Price
Annual Software Subscription (includes 5% annual increase) $16,785 USD
Year 5 Price
Annual Software Subscription (includes 5% annual increase) $17,624 USD
Subtotal: $84,120
OPTIONAL SERVICE A: Performance Metrics
Implementation & Build Services: for Performance Measure Implementation and Performance Measure Build
$27,150
Subtotal: $27,150
OPTIONAL SERVICE B: Performance Metrics
Consulting Services: Performance Measurement Full Facilitation Service for 14 Departments
$39,825
Subtotal: $39,825
Grand Total: $151,095
The platform also has add-on capacity for performance metrics data accumulation and reporting to varied levels of stakeholders.

The cost for the optional add-on module for a performance metrics platform is a one-time fee of $27,150. There would be no additional annual maintenance fee.

Further, the optional cost of using Envisio’s consulting services to build and help City Management by designing useful Performance Metrics would also be a one-time optional cost of $39,825. These would be consulting services and also would not have an additional annual maintenance fee.

Staff is requesting for the agreement to be approved in the amount of $84,120 for five years, with optional services for performance metrics development of $27,150 and/or second optional services of $39,825, for a total of $151,095. Staff is also requesting a Staff Report
Envisio
February 4, 2025
6 purchase order to be approved for the first year in the amount of $18,500 for the audit finding platform.

FISCAL IMPACT
An agreement for five years is being requested for approval for Envisio for an amount of One-Hundred Fifty-One Thousand Ninety-Five Dollars ($151,095.00) .

A Purchase Order payable to Envisio is also being requested to be issued in the amount of Eighteen-Thousand Five-Hundred Dollars ($18,500.00) for the first year of services.

The remaining annual payments shall be budgeted within future City budgets in the City Controller’s and City Manager’s Department Budgets. Funds are available in the following accounts within the FY2024-2025 City Controller Department’s Budget:

Account Code Account Name Amount
1001-650-000-4222 General Fund, City Controller Dept $18,500.00 Software Services

RECOMMENDATION
Staff recommends the adoption of the attached Resolution.

APPROVED FOR FORWARDING:

SHARON RAHBAN NAVIZADEH

CITY CONTROLLER FORWARDED TO CITY MANAGER
RESOLUTION NO. __________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COMPTON

AUTHORIZING THE CITY MANAGER TO ENTER INTO A FIVE-YEAR

AGREEMENT WITH AND ISSUE A PURCHASE ORDER TO ENVISIO FOR

INTERNAL-AUDIT-REPORTING SOFTWARE SERVICES AND OPTIONAL PERFORMANCE METRIC REPORTING SOFTWARE SERVICES ($151,095).

WHEREAS, The City of Compton Single Audit Report of Fiscal Year 2019-2020 stated the following (below) audit findings and recommendations related to Internal Audit Operations of the City:

Audit Finding #2014-118B – Information:

Criteria: Development or revision of information systems is based on the strategic plan linked to the entity’s overall strategy, and is responsive to achieving City-wide objectives.

Recommendation: We recommend the City have development or revision of information systems based on the City’s overall strategy. These systems should also be responsive to achieving City-wide objectives.

Audit Finding #2014-119B – Information:

Criteria: Management supports the development of necessary information systems and shows its support by committing appropriate resources.

Recommendation: We recommend that City Management support the development of necessary information systems, including committing appropriate resources.

Audit Finding #2014-126B – On Going Monitoring:

Criteria: Communications from external parties are corroborated with internally generated data and able to indicate problems with internal control.

Condition: Internal Control issues noted in prior years’ reviews and audits had not been addressed by management. – SCO Finding 14:

Recommendation: We recommend the City adopt formal governance processes and procedures to provide appropriate oversight of internal audit functions and activities, and respond in a timely manner to recommendations.

Audit Finding #2014-133B – Separate Evaluation:

Criteria: The evaluations are conducted by the City Auditor’s Office, who has sufficient resources, ability, and independence
Condition: The City does not have a City Auditor’s Office Recommendation: We recommend that once an internal control unit has been established that the City ensures that they have the necessary resources, ability, and independence.

Audit Finding #2014-136B - Report Deficiencies:

Criteria: Deficiencies are reported to the person directly responsible and to a person at least one level higher.

Condition: Deputy Treasurer admitted to embezzling money from the City’s cash receipts on 12/15/16. The Mayer Hoffman McCann CPA firm reported that it was unable to reach an opinion n whether the City’s FY2010-11 June financial statements were free of material misstatements, due to their inability to obtain sufficient evidence from the Mayor or the City with respect to the Mayor’s concerns of fraud on 7/24/12.

Governance practices recommended by the FY2011-12 Civil Grand Jury Report were not implemented, such as: develop a strategic plan, develop and report on performance measures, develop specific goals for the City’s executive and conduct annual evaluation of City’s executive. The City Council failed to exercises oversight over the City’s financial and operational activities. Prior years’ audit and review finding and recommendation were not implemented. Related Finding SCO 3, 7, 17.

Recommendation: We recommend that issues and deficiencies are directly communicated to the Responsible Personnel and elevated to someone at least a level higher.

Audit Finding #2014-137B – Report Deficiencies:

Resolution No. _________

Page 2 ends

2 Criteria: The identified transactions or events are investigated to determine causes and correct problems:

Condition: Prior years’ audit and review issues had not been corrected. SCO Finding

17. Recommendation: We recommend the City develop a priority schedule of the identified audit findings and establish an estimated completion date to allow the City to focus on the items that need more immediate attention. Going forward, we recommend that an audit committee be responsible overseeing the response to audit findings and the implementation of the City’s corrective action plans.

Audit Finding #2014-110B – Common Categories of Control Activities:

Criteria: Managers review performance reports
Recommendation: We recommend that City Management review performance reports to gain an understanding where additional training or other corrective actions are necessary.

Other audit findings that are related are:

Audit finding # 2014 – 102B Risk Identification, #2014 – 103B Risk Identification, #2014-104B – Risk Identification, #104-124B – On-going Monitoring, #2014-134B Separate Evaluation; #2014-135B Report Deficiencies; Audit Finding #2014-086B – Management Philosophy and Operating Style; Audit Finding #2014-100B – Risk Identification; Audit Finding #2014-129B – On-going Monitoring; Audit Finding #:
2014-065A (Also SCO Finding 17); Audit Finding #2014-121B – Communication; #2014-088B – Management Philosophy and Operating Style; Audit Finding #2014- 123B – Communication; Audit Finding #2014-101B – Risk Identification; WHEREAS, the City needs technical expertise to advance the goals and policies of the Mayor and Council in order to actively respond, implement, and report the status of corrective action or of City department performance metrics.

WHEREAS, staff recommends that the proper organization of the findings, corrective action plans, and progress related to the Single Audit, or related to any other audit of the City, should be made available electronically, and in an organized fashion, to those responsible for oversight, evaluation, and testing.

WHEREAS, currently, the data regarding these audit findings is only contained in a report which cannot be sorted or filtered. Additionally, the existing report is not flexible or tailorable for varied audiences. Also as time progresses, and corrective action plans get implemented, the past audit findings get omitted from newer reports.

WHEREAS, due to the high turnover of staff at the City, it is important for all audit findings, and their corrective action plans to be organized and continuously evaluated and monitored in a user-friendly reporting format. This will assist the City and staff to prevent repeated audit findings, or prevent new audit findings in the future. It will also assist in Cityresource-planning to identify areas of high risk.

WHEREAS, the City is also in need of an organized data gathering and reporting platform for Departmental Performance Metrics reporting. Per Audit Finding #2014-110B – Common Categories of Control Activities, the Auditor has recommended that City Management review performance reports to gain an understanding of where additional training or other corrective actions are necessary. City Management monitoring of performance metrics allows for risk identification and increased levels of communication between departments and City Management.

WHEREAS, City staff in the Controller’s office have reached out for quotes from vendors who could possibly provide a software solution to organize and provide reporting on Resolution No. _________

Page 3 ends

3 the City’s various audit findings, corrective action plans, performance metrics, and their attributes that need a user-friendly-reporting mechanism. Staff searched Planet Bids library and website, and Google for suitable software.

WHEREAS, The search for this specialized reporting software ended with Envisio, after contacting various other possibilities that were not responsive to the City’s needs.

Envisio Solutions Inc. is the sole vendor offering a specialized solution designed for the public sector and government agencies. The software also has a Proprietary aggregation algorithm ensuring real-time updates and visual representation of progress and status.

WHEREAS, The cost of the Envisio software for audit finding organization and reporting, with optional services for performance metrics development and platform build is as follows:

Audit Finding Organization and Reporting
Year 1 Price
Annual Software Subscription + One-time Professional Services $18,500
Year 2 Price
Annual Software Subscription (includes 5% annual increase) $15,225
Year 3 Price
Annual Software Subscription (includes 5% annual increase) $15,986
Year 4 Price
Annual Software Subscription (includes 5% annual increase) $16,785
Year 5 Price
Annual Software Subscription (includes 5% annual increase) $17,624
Subtotal: $84,120
OPTIONAL SERVICE A: Performance Metrics
Implementation & Build Services: for Performance Measure Implementation and Performance Measure Build
$27,150
Subtotal: $27,150
OPTIONAL SERVICE B: Performance Metrics
Consulting Services: Performance Measurement Full Facilitation Service for 14 Departments
$39,825
Subtotal: $39,825
Grand Total: $151,095
WHEREAS, staff is requesting for the agreement to be approved in the amount of $84,120 for five years, with optional services for performance metrics development of $27,150 and/or second optional services of $39,825, for a total of $151,095.

WHEREAS, staff is also requesting a purchase order to be approved for the first year in the amount of $18,500 for the audit finding platform.

WHEREAS, it is recommended that the City Council adopt the attached Resolution to approve the agreement, and to authorize the City Manager to open a purchase order to Envisio Solutions Inc, for audit finding organization and reporting, with optional services for performance metrics development and platform build.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COMPTON DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. That the City Manager is hereby authorized to enter into a professional services agreement with Envisio Solutions Inc, for audit finding organization and reporting, with optional services for performance metrics development and platform build for five years in the amount not to exceed One-Hundred Fifty-One Thousand Ninety-Five Dollars ($151,095.00).

Resolution No. _________

Page 4 ends