UP UP UPUP UP UPUPUP UPUP UP UP
426.51'
7 cars
455.47'
5'
L
24' 0" aisle
.
8' setback
Landscape (typ)
Patio (typ)
14' setback14' setback
Farm Bureau Road 2' Landscape
84.45'
Visibility Triangle - no
obstructions taller than 3'
6' wood fence along
property line
6' wood fence along
property line
Transformer
6' wood fence along
property line
Light Bollard(typ)
Light Sconce(typ)
Condenser(typ) Light Bollard(typ)
Light Sconce(typ)
Condenser(typ)
5' setback
for Fence
15' portion
for 3' high Fence
DW
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F F
22' deep x 20' Wide 22' deep x 20' Wide 22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide Fire Access
Storm Drain
Easement
22' deep x 20' Wide22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide 22' deep x 20' Wide Covered Refuse
Enclosure
Storage
KitchenLiving
Bath
Entry
24' aisle 18'-0" 3'-0" Landscape
9'-0" Stall
(typ)
Accessible Path
Electric Vehicle
Stall
DW
F
22' deep x 20' Wide
26'0"
33'6"
11'0"
7'3" Clr
Up
6'6" Clr
Storage
KitchenLiving
Bath
Entry
41'0"
7'6"
18"
36"
48"
W
W
23'0"
Dn
15'6"5'3" 5'3"
13'6"
26'0"
13'6"
2'6"
13'6"
7'6"
2'0"
45'6"
Bedroom 2
Den
Bath Bath
Bedroom 1
Closet
Closet
Closet
Open
UP UP UPUP UP UPUPUP UPUP UP UP
426.51'
7 cars
455.47'
5'
24' 0" aisle
8' setback
Landscape (typ)
Patio (typ)
14' setback14' setback
Farm Bureau Road 2' Landscape
84.45'
Visibility Triangle - no
obstructions taller than 3'
6' wood fence along
property line
6' wood fence along
property line
Transformer
6' wood fen
property lin
Light Bollard(typ)
Light Sconce(typ)
Condenser(typ) Light Bollard(typ)
Light Sconce(typ)
Condenser(typ)
5' setback
for Fence
15' portion
for 3' high Fence
DW
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F F
22' deep x 20' Wide 22' deep x 20' Wide 22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide Fire Access
22' deep x 20' Wide22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide 22' deep x 20' Wide Covered Refuse
Enclosure
Storage
KitchenLiving
Bath
Entry
24' aisle 18'-0" 3'-0" Lands
9'-0" Stall
(typ)
Accessible Path
Electric Vehicle
Stall
JOHNSON
LY M A N
ARCHITECTS
1375 Locust Street, #202, Walnut Creek, CA 94596
925.930.9690 930.9039 fax A1
10.12.21 Concord
1536 Farm Bureau Road
California
Ground Level
1/16" = 1'0"
0' 16' 48'
Ground Level Second Level
Fence Plan
All fencing shown in red is 6' high wood fencing
6' high wood fencing (typ)
6' high wood fencing (typ)
All units to designed to be adaptable, with all doors 3'0", and accessible path thro ughout Ground level
UP UP UPUP UP UPUPUP UPUP UP UP
DW
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F F
22' deep x 20' Wide 22' deep x 20' Wide 22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide 22' deep x 20' Wide22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide22' deep x 20' Wide 22' deep x 20' Wide 22' deep x 20' WideStorage KitchenLiving
Bath
Entry
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
UP
W
Bedroom 2
Den
BathBath
Bedroom 1
Closet
Closet
Closet
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
W
UP
W
UP
W
Bedroom 2
Den
BathBath
Bedroom 1
Closet
Closet
Closet
JOHNSON
LY M A N
ARCHITECTS
1375 Locust Street, #202, Walnut Creek, CA 94596
925.930.9690 930.9039 fax A2
Overall Elevation
3/32"= 1'0"
Concord
1536 Farm Bureau Road
California
Overall South Elevation
Group A Group B
Overall North Elevation
Group AGroup B
0' 10.67' 32'
Ground Level Plan
Second Level Plan
9.15.21
JOHNSON
L YMAN
ARCHITECTS
1375 Locust Street, #202, Walnut Creek, CA 94596
925.930.9690 930.9039 fax A3
9.15.21Concord
1536 Farm Bureau Road
California
Vertical
Grooved Siding
Vertical
Siding
Horizontal
Siding
Dark Anodized
Window Frames
Property
Line
Vertical
Battens
Projecting
Canopy
Covered Refuse
Enclosure
Vertical
Grooved Siding
Property
Line
21'0"
21'0"
23'0"
8'6"
Vertical
Battens
Vertical
Siding
Projecting
Canopy
21'0"
21'0"
21'0"
23'6" 23'6"
Frosted Glass
Garage Door
Vertical
BattensProjecting Canopy
at Entry (typ)
North Elevation
South Elevation
East Elevation
West Elevation
1/8"= 1'0" 1/8"= 1'0"
1/8"= 1'0" 1/8"= 1'0"
1/8"= 1'0"
Elevations - Group A
0' 24'8'
JOHNSON
L YMAN
ARCHITECTS
1375 Locust Street, #202, Walnut Creek, CA 94596
925.930.9690 930.9039 fax A4
North Elevation
South Elevation
Vertical
Grooved Siding
23'0"
Concord
1536 Farm Bureau Road
California
Vertical
Siding
East Elevation
Elevations - Group B
Horizontal
Siding
21'0"
Vertical
Battens
Projecting Canopy
at Entry (typ)
24'0"
Frosted Glass
Garage Door
West Elevation
Property
Line
Vertical
Battens
Projecting
Canopy
Covered Refuse
Enclosure
Vertical
Grooved Siding
Property
Line
21'0"
21'0" 21'0"
23'0"
8'6"
Vertical
Battens
Vertical
Siding
Projecting
Canopy
21'0"
Dark Anodized
Window Frames
1/8"= 1'0" 1/8"= 1'0"
1/8"= 1'0" 1/8"= 1'0"
0' 8' 24'
1/8"= 1'0"
9.15.21
Adjacent
Residential
Vertical
Grooved
Siding
19' 0"
JOHNSON
L YMAN
ARCHITECTS
1375 Locust Street, #202, Walnut Creek, CA 94596
925.930.9690 930.9039 fax CBConcord
1536 Farm Bureau Road
California
Section/Materials
Property
Line
Vertical
Siding
Vertical Battens
Vertical
Battens
Composite Siding
New Tech Slats
Vertical Siding
Ceraclad Gray Allura Cedar
AluminumWindow
Dark Anodized
Rear Yard
14' setback
10' 0"
23' 6"
21' 0"
Horizontal
Siding
Typical Elevation/SectionSection A
A
A
0' 12'
1/4"= 1'0"
4'
Vertical Grooved Siding
Ceraclad
Composite Siding
Ceraclad Beige
Colors/Materials
Roof Plan 1/16"= 1'0"
Garage
Built Up Roof (typ) Built Up Roof (typ)
Wall Lights
Visa Sconce
CB5515 - Shine
Wall Lights
Patio
6' high wood
fence
5' wide access
path for Fire
Department
Light Bollard
Bega - 8" x47" tall
84-668
9.15.21 Site Light
Bega - 15' tall
99-596
Transformer
JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT
JT
JT
P>P>P>P>P>P>P>P>P>P>P>P>P> <P<P<P<P<P<P
UP UPUP UP UPUP UP UPUP UPUPUP
P>P>P>P><P<P
P> P> P>
P> P> P>
P> P> P>
<P
JT
FARM BUREAU ROAD
LAVETTA WAY
ACACACACACACACACACACACAC
PROPOSED
GAS METER
LOCATIONS
VINES CLIMBING WIRE
TRELLISES (TYPICAL)
(SEE DETAIL 2/L2)
STORMWATER
BIO-TREATMENT
BASINS
STORMWATER
BIO-TREATMENT
BASINS
TRASH
ENCLOSURE
6 FT. HEIGHT WOOD FENCE ON
RETAINING WALL AT PROPERTY LINES
(SEE WOOD FENCE DETAIL1/L2)6 FT. HEIGHT WOOD FENCE BETWEEN
EACH PRIVATE RESIDENCE PATIO
(SEE WOOD FENCE DETAIL 1/L2)
4 FT. WIDE CONCRETE
WALKWAY ACCESS ALONG
NORTH PROPERTY LINE
DECORATIVE PERMEABLE
PAVERS IN DRIVEWAY
DECORATIVE PERMEABLE
PAVERS IN DRIVEWAY
6 FT. HEIGHT WOOD FENCE ON
RETAINING WALL AT PROPERTY LINES
(SEE WOOD FENCE DETAIL 1/L2)
LOW PLANTING AT PROPERTY
LINE WITH VINES ATTACHED
TO FENCE
LOW PLANTING AT PROPERTY
LINE WITH VINES ATTACHED
TO FENCE
SECONDARY BROADLEAF
EVERGREEN TREES
(BRONZE LOQUAT)
PRIMARY BROADLEAF
EVREGREEN TREES
(HOLLY OAK)
FLOWERING ACCENT
TREES (REDBUDS)
SCREEN PLANTING
AROUND TRANSFORMER
4'
DECIDUOUS CANOPY TREE
(CHINESE PISTACHE)
D
D
D
D
J
J
J
J
A.C. CONDENSER
AT EACH PRIVATE PATIO
PRELIMINARY
LANDSCAPE PLAN
L1L1 REFER TO SHEET L2 FOR TREE IMAGES
FARM BUREAU IMPROVEMENTS
1540, 1538 & 1536 FARM BUREAU
CONCORD, CALIFORNIA
RW Stover & Associates, Inc.
Landscape Architecture
Ph: 925.933.2583
1620 North Main Street, Suite 4
Walnut Creek, CA 94596
CONCEPTUAL PLANT MATERIALS LIST:
BOTANICAL NAMECOMMON NAMEMATURE WATERSIZE
(*) INDICATES BASIN CONTRA COSTA C3 BASIN PLANTSSIZE (HxW)USAGE DECIDUOUS CANOPY TREE:
PISTACIA CHINENSISCHINESE PISTACHE30'X30'LOW24" BOX
PRIMARY BROADLEAF EVERGREEN TREE:
QUERCUS ILEXHOLLY OAK50'X35'LOW24" BOX
SECONDARY BROADLEAF EVERGREEN TREE:
*ERIOBOTRYA DEFLEXABRONZE LOQUAT25'X25'MED24" BOX
FLOWERING ACCENT TREE:
*CERCIS OCCIDENTALISREDBUD (STANDARD)15'X15'LOW24" BOX
LARGE SHRUBS:
ARCTOST. 'HOWARD MCMINN'MCMINN MANZANITA6'x8'LOW5 GAL
LOROPETALUM 'BURGUNDY'FRINGE FLOWER5'x5'LOW5 GAL
WESTRINGIA FRUTICOSA'WYNYABBIE GEM'4'x4'LOW5 GAL
MEDIUM SHRUBS:
BUXUS SEMPER. 'GREEN TOWER'COLUMNAR BOXWOOD2'x8'MED5 GAL NANDINA 'FIREPOWER'FIREPOWER NANDINA2'x2'LOW5 GAL
*SALVIA GREGGIIAUTUMN SAGE2'x2'LOW5 GAL
TEUCRIUM F. 'COMPACTA'COMPACT GERMANDER3'x3'LOW5 GAL
ACCENT PERENNIALS/GRASSES:
*ACHILLEA FILIPENDULINAFERNLEAF YARROW2'x3'LOW5 GAL
ANIGOZANTHOS 'BUSH BABY'KANGAROO PAW2'x2'LOW1 GAL
DIETES BICOLORFORTNIGHT LILY3'x3'LOW1 GAL
ERIGERON KARV. 'MOERHEIMII'SANTA BARBARA DAISY18"x3'LOW1 GAL LOMANDRA LONG. 'BREEZE'DWARF MAT RUSH3'x3'LOW1 GAL
PENNISETUM 'BUNNY TAILS'DWARF FOUNTAIN GRASS3'x3'LOW1 GAL VINE:
CLYTOSTOMA CALLESTEGIODESLAVENDER TRUMPET VINE10'x10'MED5 GAL FICUS PUMILACREEPING EVERGREEN FIG10'x10'MED5 GAL
GELSEMIUM SEMPERVIRENSCAROLINA JESSAMINE10'x10'LOW5 GAL PANDOREA JASMINOIDESBOWER VINE10'x10'MED5 GAL
GROUND COVERS: @ 36" O.C. SPACING
COPROSMA 'KIRKII'CREEPING COPROSMA2'x10'LOW1 GAL
ROSMARINUS 'PROSTRATUS'PROSTRATE ROSEMARY2'x8'LOW1 GAL
BASIN GROUND COVERS: @ 36" O.C. SPACING
*DESCHAMPSIA CESPITOSATUFT HAIR GRASS3'x3'LOW1 GAL
*JUNCUS PATENSBLUE RUSH 18"x18"LOW1 GAL.
FARM BUREAU IMPROVEMENTS
1540, 1538 & 1536 FARM BUREAU
CONCORD, CALIFORNIA
RW Stover & Associates, Inc.
Landscape Architecture
Ph: 925.933.2583
1620 North Main Street, Suite 4
Walnut Creek, CA 94596
D
J
GENERAL NOTES:
1. ALL PLANTING SHALL BE WATERED BY A FULLY AUTOMATIC, WATER-CONSERVING IRRIGATION SYSTEM W/ WEATHER-BASE CONTROLLER.
2. ALL PLANTING AREAS (EXCEPT STORMWATER BASINS) SHALL RECEIVE A 3" LAYER OF FIRBARK MULCH DRESSING.
3. STORMWATER BASINS (BOTTOMS) SHALL RECEIVE A 2" LAYER OF RIVERWASHED PEBBLES.
4. PROPOSED TREES TO ALL BE 24" BOX SIZE.
5. TREES SPECIFIED FOR STORMWATER BASIN PLANTERS SELECTED FROM THE CONTRA COSTA COUNTY STORMWATER GUIDEBOOK SUGGESTED PLANT LIST.
6. LANDSCAPE PLAN IS IN COMPLIANCE WITH THE CITY STANDARDS:
SIGNED:_____________________________
TREE IMAGES
AND DETAILS
L2 FARM BUREAU IMPROVEMENTS
1540, 1538 & 1536 FARM BUREAU
CONCORD, CALIFORNIA
RW Stover & Associates, Inc.
Landscape Architecture
Ph: 925.933.2583
1620 North Main Street, Suite 4
Walnut Creek, CA 94596
QUERCUS ILEX
(HOLLY OAK)
*ERIOBOTRYA DEFLEXA
(BRONZE LOQUAT)
*CERCIS OCCIDENTALIS
(WESTERN REDBUD-STANDARD)
NO SCALE
VINE WIRE DETAIL
ITEM DESCRIPTIONS:
A - STAINLESS STEEL WIRE (12 GAUGE); EXTEND THRU EYEHOOKS B - 1"Ø EYE HOOK SET INTO BUILDING WALL SURFACE, SET AND SEAL WITH POLYURETHANE SEALANT; SET ON DIAGONAL 24" GRID
CENTERED ON WALL FACE
C - WALL WITH STUCCO FINISH
D - FINISH GRADE
B
C
A
SECTION:
24" O.C. TYPICAL
D
12"
4 ELEVATION:
SECTION VIEW:
HORIZONTAL BOARD WOOD FENCE DETAIL
NOTES:
1. ALL POSTS, RAILS AND MID SUPPORTS TO BE PRESSURE
TREATED DOUGLAS FIR.
2. ALL CAPS AND 1x4 BOARDS TO BE ROUGH SAWN
CLEAR HEART REDWOOD.
3. HOLD FENCE CAP AND FASCIA BOARDS LEVEL; STEP FENCE
HEIGHT TO MATCH GRADE AS NECESSARY, IN INCREMENTS
SO FASCIA BOARDS ALIGN LEVEL.
4. PROVIDE STAIN APPLICATION AS DIRECTED BY OWNER
1 2
3 6
1 2
3 5
7 DESCRIPTIONS:
1 2x6 CONTINUOUS REDWOOD CAP.
2 1x4 REDWOOD BOARDS SET WITH 1" GAP BETWEEN
BOARDS; OFFSET 1" ON OPPOSITE SIDES OF POSTS.
3 4x4 PTDF POSTS - SET AT 8" O.C. SPACING (MAX.).
4 2x4 PTDF VERTICAL MID SUPPORT BETWEEN CAP
AND BOTTOM RAIL - ONE PER SPAN BETWEEN POSTS.
5 2x4 PTDF BOTTOM RAIL LAID FLAT BETWEEN POSTS;
PROVIDE 3/4"Ø WEEP HOLES @ 24" O.C. BETWEEN POSTS.
6 TOP OF WALL.
7 NEW RETAINING WALL - REFER TO STRUCTURAL PLANS
8 'SIMPSON' #LCB44 COLUMN BASE WET-SET IN WALL;
SECURE POST WITH (2) 1-1/2"Ø THREADED RODS, WASHERS
AND HEX NUTS, CUT ROD ENDS FLUSH
9 2x8 PRESSURE TREATED DOUGLAS FIR KICKER BETWEEN
POSTS
7"
2'-6"
2'-8"
4 8'-0" O.C. MAX.
2'-8"
9 6'-0"
9 5
8 8
1 2
PISTACIA CHINENSIS
(CHINESE PISTACHE)
TREES
UPUPUP UPUPUP UP UPUP UPUPUP
.
Patio (typ)
Farm Bureau Road
Transformer
DW
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
F
DW
FF
deep [ 0
Wide
deep [ 0
Wide
deep [ 0
Wide
deep [ 0
Wide
deep [ 0
Wide
Fire Access
deep [ 0
Wide
deep [ 0
Wide
deep [ 0
Wide
deep [ 0
Wide
deep [ 0
Wide
deep [ 0
Wide
deep [ 0
Wide
Refuse
Storage
Kitchen
Living
Bath
(ntry
0.9 0.9
3.1 3.1
6.0 6.0
3.1 3.1
0.9 0.9
1 0.14 0.16 0.18 0.20 0.21 0.22 0.23 0.24 0.24 0.24 0.25 0.25 0.25 0.25 0.25 0.25 0.24 0.24 0.24 0.23 0.23 0.23 0.23 0.23 0.24 0.26 0.32 0.47 0.59 0.66 0.73 0.71 0.60 0.50 0.42 0.35 0.32 0.30 0.28 0.27 0.26 0.26 0.26 0.26 0.25 0.26 0.26 0.26 0.25 0.25 0.26 0.26 0.26 0.26 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.24 0.24 0.24 0.24 0.23 0.22 0.21 0.20 0.18 0.16 0.15 0.14 0.14 0.14 0.16 0.19 0.24 0.32 0.41 0.52 0.60 0.56 0.49 0.39
0.17 0.21 0.25 0.28 0.31 0.33 0.35 0.36 0.36 0.36 0.37 0.38 0.37 0.37 0.37 0.38 0.38 0.37 0.37 0.36 0.36 0.35 0.34 0.35 0.35 0.36 0.38 0.50 0.70 0.83 0.88 1.00 0.94 0.76 0.66 0.55 0.47 0.43 0.41 0.40 0.40 0.39 0.38 0.38 0.38 0.38 0.39 0.38 0.38 0.38 0.38 0.39 0.38 0.38 0.38 0.38 0.39 0.38 0.38 0.37 0.38 0.38 0.37 0.37 0.36 0.36 0.36 0.35 0.33 0.30 0.27 0.24 0.22 0.19 0.17 0.17 0.18 0.22 0.29 0.40 0.53 0.67 0.83 0.77 0.70 0.58
0.28 0.35 0.41 0.46 0.52 0.58 0.62 0.60 0.58 0.58 0.61 0.65 0.62 0.60 0.59 0.62 0.65 0.63 0.60 0.58 0.59 0.61 0.60 0.54 0.55 0.55 0.59 0.78 1.01 1.16 1.11 1.32 1.14 0.92 0.81 0.73 0.65 0.61 0.60 0.62 0.65 0.63 0.61 0.59 0.60 0.63 0.64 0.62 0.60 0.61 0.64 0.66 0.63 0.60 0.61 0.63 0.66 0.63 0.60 0.59 0.62 0.64 0.62 0.60 0.58 0.60 0.61 0.60 0.55 0.49 0.45 0.39 0.34 0.26 0.21 0.19 0.20 0.24 0.33 0.46 0.61 0.80 1.06 1.01 0.91 0.83
0.50 0.69 0.76 0.77 0.91 1.10 1.22 1.09 0.94 0.97 1.12 1.24 1.13 0.99 0.95 1.10 1.23 1.17 1.03 0.93 1.04 1.16 1.17 0.99 0.81 0.92 0.96 1.15 1.46 1.69 1.51 1.89 1.45 1.09 1.03 1.06 0.99 0.92 0.93 1.08 1.22 1.15 1.00 0.92 1.04 1.18 1.23 1.09 0.96 1.03 1.17 1.26 1.12 0.97 1.00 1.15 1.26 1.14 0.98 0.95 1.09 1.22 1.15 1.02 0.93 1.05 1.18 1.18 1.00 0.81 0.78 0.72 0.61 0.39 0.26 0.21 0.20 0.24 0.34 0.50 0.67 0.94 1.37 1.40 1.24 1.20
0.90 1.48 1.51 1.22 1.59 2.18 2.57 2.07 1.47 1.55 2.14 2.56 2.16 1.63 1.45 2.03 2.54 2.28 1.78 1.40 1.85 2.34 2.42 1.87 1.28 1.39 1.83 1.92 2.19 2.85 2.61 2.85 2.00 1.35 1.37 1.78 1.82 1.46 1.44 1.96 2.42 2.19 1.75 1.38 1.83 2.34 2.50 1.98 1.45 1.72 2.26 2.62 2.10 1.49 1.60 2.20 2.62 2.18 1.57 1.46 2.04 2.49 2.23 1.77 1.40 1.86 2.39 2.44 1.84 1.26 1.40 1.44 1.16 0.57 0.31 0.22 0.22 0.26 0.35 0.53 0.78 1.18 1.99 2.32 2.13 2.00
0.41 0.98 1.18 1.57 1.27 1.69 1.55 2.64 2.01 1.53 1.62 1.79 2.76 1.65 1.72 1.49 2.04 2.47 1.61 1.90 1.43 1.95 1.91 2.21 1.95 1.32 1.49 0.71 2.36 2.81 4.21 4.22 4.02 2.43 1.60 1.62 1.99 1.57 1.36 1.38 1.85 2.50 1.58 1.87 1.41 1.93 1.82 2.33 2.05 1.49 1.82 1.60 2.66 2.06 1.54 1.67 1.82 2.80 1.84 1.66 1.51 1.95 2.54 1.60 1.89 1.43 1.96 1.91 2.09 1.95 1.29 1.50 0.66 1.29 0.58 0.30 0.21 0.23 0.30 0.44 0.66 0.95 1.44 2.77 3.76 3.58 3.04
0.00 0.00 0.000.000.000.000.001.44 3.06 5.45 6.34 4.81 2.67 2.01 1.18 0.690.000.00 0.550.000.000.000.00 0.000.03 0.04 0.22 0.17 0.21 0.31 0.50 0.84 1.35 1.90 3.16 5.38 5.23 4.24
0.001.58 3.96 6.55 8.23 4.91 2.79 2.10 1.29 0.740.04 0.05 0.09 0.19 0.31 0.53 0.92 1.60 2.32 3.36 6.04 6.96 5.66
0.00 0.001.55 4.49 7.62 7.73 4.95 3.01 2.14 1.34 0.770.04 0.06 0.10 0.17 0.30 0.54 0.96 1.64 2.42 3.57 6.01 7.71 6.55
0.00 0.001.58 3.85 6.32 7.99 4.85 2.76 2.080.04 0.05 0.08 0.15 0.28 0.52 0.92 1.60 2.34 3.33 5.96 7.45 6.00
0.00 0.00 0.001.38 2.91 5.07 5.87 4.61 2.51 1.730.04 0.06 0.09 0.16 0.29 0.50 0.86 1.45 2.04 3.24 5.84 5.85 4.65
0.00 0.00 0.000.99 2.12 3.77 3.75 3.70 2.19 1.210.04 0.06 0.09 0.16 0.27 0.44 0.71 1.08 1.55 2.96 4.29 4.17 3.47
0.00 0.00 0.000.70 1.53 2.38 2.23 2.48 1.69 0.970.04 0.05 0.09 0.14 0.22 0.34 0.53 0.80 1.25 2.25 2.73 2.54 2.30
0.00 0.00 0.00 0.000.53 1.01 1.34 1.25 1.61 1.21 0.800.04 0.05 0.08 0.13 0.19 0.30 0.49 0.67 0.98 1.51 1.64 1.42 1.40
0.00 0.00 0.00 0.002.70 2.06 0.64 0.22 0.10 2.64 2.66 1.14 0.58 0.86 2.39 2.84 1.60 0.49 0.19 1.91 2.77 1.90 0.58 0.212.81 2.12 0.65 0.22 0.10 0.42 0.72 0.92 0.93 1.14 0.95 0.71 0.00 0.00 0.12 0.29 0.88 2.57 2.77 0.10 0.22 0.63 2.01 2.690.19 0.51 1.66 2.74 2.16 0.13 0.33 1.05 2.74 2.75 0.13 0.31 0.97 2.74 2.85 0.10 0.22 0.62 2.05 2.82 1.83 0.18 0.48 1.53 2.60 2.18 0.04 0.06 0.09 0.13 0.20 0.30 0.45 0.62 0.83 1.14 1.11 1.01 0.93
0.00 0.00 0.00 0.000.79 3.20 0.70 0.23 0.10 5.31 5.32 1.36 0.60 0.93 3.76 2.70 2.11 0.52 0.19 2.80 0.04 2.78 0.63 0.210.79 3.20 0.70 0.23 0.10 0.27 0.50 0.66 0.73 0.85 0.79 0.60 0.47 0.00 0.12 0.30 1.01 4.66 5.00 0.10 0.23 0.69 3.12 0.510.19 0.54 2.29 1.51 3.39 0.14 0.35 1.25 5.26 5.28 0.13 0.32 1.12 5.02 5.31 0.10 0.22 0.67 3.04 0.28 2.56 0.18 0.51 2.12 2.51 3.63 0.04 0.06 0.09 0.13 0.19 0.27 0.40 0.54 0.70 0.89 0.83 0.76 0.66
0.00 0.00 0.09 0.19 0.54 1.77 2.87 2.20 0.79 0.58 1.22 3.16 3.16 1.22 0.60 0.86 2.33 2.74 1.67 0.70 0.78 2.02 2.86 2.04 0.80 0.75 1.82 2.77 2.10 0.67 0.24 0.11 0.23 0.36 0.48 0.56 0.62 0.61 0.50 0.41 0.34 0.13 0.31 0.92 2.75 3.02 1.41 0.63 0.81 2.21 2.91 1.90 0.74 0.72 1.79 2.82 2.26 0.82 0.59 1.20 3.01 3.00 1.22 0.67 1.13 2.87 2.95 1.28 0.60 0.78 2.10 2.78 1.87 0.73 0.68 1.72 2.93 2.40 0.76 0.30 0.19 0.17 0.16 0.23 0.32 0.43 0.56 0.67 0.63 0.56 0.45
0.2 0.2
0.2 0.2
0.5 0.5
0.5 0.5
0.5 0.5
0.5 0.5 1
1 1
1 1
1 1
1 SITE PLAN - PHOTOMETRIC
PE-1
1/16"=1'-0"
1536 Farm Bureau Road
9-7-21
4457 Willow Road, Suite 100
Pleasanton, California 94588
phone: (925) 621-5300 fax: (925) 474-2159
[email protected]
ConcordCalifornia [email protected]
PHONE: 925.930.9690
EMAIL:
WWW.JOHNSONLYMAN.COMWEB PAGE:
Luminaire Schedule
SymbolQtyTagDescriptionLLFLuminaire
Lumens
Luminaire
Watts
Total
Watts
FilenameMounting
Height
BUG Rating
2ABega 99 5960.850935776.3152.699596_BEGA_IES.ies16B2-U0-G2 24BVisa Lighting Shine CB5515-L35K-L0.850153814336CB5515-L35K-L.ies6B0-U4-G1 12CBega 84 6680.85029863744484668_K4_BEGA_IES.ies3.9B1-U5-G2 1DFC Lighting FCW38013K15L0.85014871515F006172 FCW38013K15L.ies8B1-U1-G1 Calculation Summary
LabelCalcTypeUnitsGrid ZAvgMaxMinAvg/MinMax/Min
Refuse_FloorIlluminanceFc02.806.00.93.116.67
siteIlluminanceFc01.228.230.00N.A.N.A.
Drive + ParkIlluminanceFc1.348.20.26.7041.00
Pole Light
16 ft overall mtg ht
Bega S9-596
Ceiling Light
FC Lighting
FCW 380 13K15L
Farm Bureau Road Multifamily Project
Michael Hart, Assistant Planner
City Council
May 3, 2022
Location
2 Address: 1536, 1538, and 1540
Farm Bureau Road
APN: 114-280-049, -048, & -047
General Plan: Low-Density
Residential (LDR)
Zoning: Residential Single-Family
(RS-10)
Summary
• Background
• Project Summary
• Neighborhood Meeting
• General Plan
• Zoning
• Project Plans
• Recommended Action
3
Background
• July 22, 2021: Applicant submits application.
• August 3, 2021: Application reviewed by Development Advisory Committee (DAC).
• August 23, 2021: Project deemed incomplete.
• September 9, 2021: Applicant submits revised plans.
4
Background
• September 21, 2021: DAC reviews resubmittal.
• October 11, 2021: Application deemed incomplete for a second time. • November 16, 2021: Applicant hosts Neighborhood Meeting. 5
Project Summary
• Application Types: General Plan Amendment, Rezone, Design and Site Review
• Total Lot Size: 37,417 sq. ft (.86 acres)
• General Plan:
• Current: Low Density Residential (2.5-10 du/acre)
• Proposed: Medium Density Residential (11-32 du/acre)
• Zoning:
• Current: Residential Single-Family (RS-10)
• Proposed: Residential Medium Density (RM)
• Constructing two multifamily buildings, totaling 12 dwelling units (14 du/acre) 6
11-16-21 Neighborhood Meeting
• Too high density for neighborhood
• Loss of privacy for neighbors on Catherine Way
• Parking impacts throughout neighborhood
• Impacts to the existing sewer and water infrastructure 7
General Plan
8 • Current: Low Density
Residential (LDR)
• Proposed: Medium
Density Residential
(MDR)
Zoning
9 • Current: Residential
Single-Family (RS-10)
• Proposed: Residential
Medium Density (RM)
Existing Site
10
Site Plan
11
Floor Plans
12
Elevations – South
13
Elevations – North
14
Elevations – East and West
15
Recommended Action
16 • Direct staff to continue review and application processing of the proposed General Plan Amendment, Rezone, and
Design and Site Review.
Questions?
17
-----Original Message-----
From: Vikki Ohanis Chavez <[email protected]>
Sent: Tuesday, May 3, 2022 4:02 PM
To: Hart, Michael <[email protected]>
Subject: Tonight’s study session
I am not able to attend the study session tonight. I was at the last one/zoom/ and had hoped to make it.
I am in opposition to this ever happening. I surely hope this isn’t a last meeting prior to approval! So very bad for the location.
My family owns 1549 and 1561 across the street.
I stand by my comments last time about traffic on that part-slight turn-directly in front of proposed development. It is extremely hard to get out of the driveway that is there now.
This has been tried before as I mentioned…before you were working for the city.
Let’s improve the neighborhood as we have done on the 2 properties across from this project, not bring in more apartments, more cars, and more traffic on already busy Farm Bureau Road.
In addition, I can be in the living room at 1561 FB, and hear the trucks and a great deal of traffic day and night.
I heard much opposition to this last time.
Let me know what we can do.
You can actually read this as an opinion tonight.
Regards,
Vikki Chavez/trustee of
1549, 1561 Farm Bureau Road/Gazano family
Correspondence Received
after 3 p.m. on May 3, 2022
Agenda Item No. 5.a
Staff Report
Date: May 3, 2022
To: City Council
From: Valerie J. Barone, City Manager
Reviewed by: Karan Reid, Director of Finance
Prepared by: Kylie Hicks, Budget Analyst
[email protected]
(925) 671-3046
Subject: Considering the following:
1) Providing direction on adopting a base rate for sanitation and refuse fees; and
2) Adoption of a Resolution to update the City’s Master Fees and Charges Schedule by amending Exhibit A to Resolution No 78-6042 establishing fees and charges for various
municipal services in the City of Concord.
CEQA: Exempt/not a project per Public Resources Code
Section 21065, CEQA Guidelines Sections 15060(c)(2) or (3) 15378, and/or 15061(b)(3).
Report in Brief
Policy & Procedure No. 170 requires that certain fees and charges for City services be adjusted based on changes in labor costs. Staff received wage adjustments in FY 2021-
22. In addition to the fees that are adjusted based on changes in labor costs, staff is recommending fee adjustments in Finance, Parks & Recreation, Community Development, Sewer Service, Police, and Sanitation and Refuse to more fully recover costs based on recent analysis and market surveys. Staff also seeks direction from Council on adopting one of five scenarios for a 5-year phase-in of base rate increases for Sanitation and Refuse fees which will go into effect on July 1, 2022. These fee changes are discussed in detail in the body of this report.
6.a6.a6.a6.a6.a6.a6.a6.a
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
Recommended Action
1. Provide direction on adopting a base rate for Sanitation and Refuse Fees (Section VI).
2. Adopt a Resolution amending Exhibit A to Resolution No. 78-6042 establishing fees and charges for various municipal services in the City of Concord (Attachment 1).
The Resolution is written such that the fees and changes become effective July 1, 2022 as indicated on Attachment 1 with two exceptions: (1) Special Events fees which become effective September 1 of each year, and (2) certain fees in Parks & Recreation which become effective January 1 or June 1 of each year, as indicated in Exhibit A to Attachment 1, Pages 6-8, Schedule C.
Background
User fees and charges are collected to recover some or all costs incurred to provide a specific service from which one or more individuals obtain a benefit. Each year, the Concord City Council considers adjustments to fees through the adoption of a fees and charges resolution.
In support of the Council’s priority focus area on long-term financial stability, Council adopted Policy & Procedure 170, which sets cost recovery goals and established policy guidelines for setting and updating user fees and charges. Staff hourly rates are determined each year by using the current average cost for each position which may include up to a 3% cost of living increase due to new collective bargaining agreements reached in FY 2021-22. Therefore, fees that reflect hourly staff costs are proposed to be increased in this fee schedule, as required by P&P 170, to avoid requiring the General Fund to subsidize projects that benefit the individual.
The Policy also states that a comprehensive analysis of City costs and fees should be conducted at least every five years, the last comprehensive analysis was done in FY 2014-15, the next will be scheduled sometime in the next few years. In the interim, in order to avoid abrupt and significant increases of future fees, fees will be adjusted by annual changes in labor costs as approved by the City Council with the exception of Special Events Fees, which shall be adjusted by 3% per annum.1 Per policy, the annual adjustments are intended to allow the fees and charges to keep pace with costs of service delivery and to avoid large increases to fees in any given year.
Analysis
In accordance with Policy & Procedure No. 170, staff proposes establishing fee adjustments for FY 2022-23 to reflect the wage adjustments received by certain staff.
As part of the fee review process, staff analyzed the costs to provide the various 1 Policy & Procedure 170 was amended to adjust Special Events staff fees by 3% per year to ensure regular modest adjustments to the fees each year, creating predictability and avoiding cost spikes for special event applicants.
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
services in the Master Fee Schedule and are recommending adjustments consistent with the costs of providing the services. The Master Fee Schedule is reviewed and adjusted annually by the Council, to keep pace with costs and avoid major spikes in costs for services.
Other Fee Adjustments. In addition to fees that are proposed to increase based on changes in labor costs described above, below is a list of the most significant other proposed adjustments to the Master Fees and Charges schedule. The proposed fee changes conform to the City’s Policy and Procedure 170: User Fees and Charges Recovery. A detailed listing of the current fees and proposed changes are listed in the Attachment to Resolution 22-6042.1 Establishing Fees and Charges for Various Municipal Services in the City of Concord (Attachment 1).
I. Finance
Staff recommends increasing the Business, Professions, and Trades Fees to more accurately capture staff time spent on processing these licenses and permits.
Business, Professions, and Trades Fees (Page 5, Schedule B, various line items)
II. Parks and Recreation
Due to continued annual increases in minimum wage and additional increases in other costs of doing business, the Parks and Recreation Department is requesting fee changes to a few programs and services.
A. Preschool Programs
As part of the annual program evaluation process, fee studies were completed at the beginning of 2022, comparing fees of similar programs in the area. The proposed fees keep Concord’s Preschool program competitively priced in the marketplace while remaining an affordable option for Concord residents and other customers.
B. Camp Concord
Camp Concord utilizes the Active Network (SaaS) Recreation Management software system, which was approved by Council in 2017, to process and manage all Camp Concord reservations. The cost to the city for this technology can be as high as 4.25% of the group rental fees. One of the proposed changes includes significantly broadening the range for the Technology Fee charged to organizational user groups, enabling the city to more appropriately offset the direct costs incurred.
The proposed rental fees support continuing the new group rental operation model approved during the FY 2019-2020 budget process and are designed to enable the 29-acre resident camp facility, located in South Lake Tahoe, to
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
achieve the highest possible cost recovery goals while still making the camp affordable to non-profit and family groups.
C. Diablo Creek Golf Course – Enterprise Fund
The Parks & Recreation Department and Diablo Creek Golf Course’s contractual partner for golf course operations have prioritized maintaining and increasing customers as a top goal in an evolving golf market. Participation levels rose dramatically during the pandemic and the golf industry as a whole anticipates strong demand will continue across all sectors but particularly with youth. Diablo Creek has positioned itself as a high quality, consistent, full service municipal golf experience with an excellent location that has weathered the impacts of recession and benefited from other golf course closures. A green fee study of municipal golf courses located in neighboring communities was conducted last month and the analysis resulted in an opportunity to strategically propose moderate increases to selected green fee categories. The recommended rate increases will still position Diablo Creek Golf Course as a value oriented experience when compared to the closest community golf course options while assisting the recreation asset to remain financially sustainable as a stand-alone enterprise.
All Parks and Recreation Fees (Pages 6-8, Schedule C, various line items) III. Community Development
Planning Division
A. Table D
o Various Fee Increases Based on Hourly Rates
Multiple fees are directly based on employee hourly rates. These fees are updated to match new employee hourly rates per Table T1. Where multiple positions charge the same fee, an average of the position hourly rates is used.
o Preliminary Applications
Adding a new fee titled “SB 9 Eligibility Determination.” This fee would be a $3,000 deposit to pay for staff time to review applications to determine if projects are eligible for up to two additional units and/or a lot split under the provisions of Senate Bill 9.
o Small Wireless Facility
This is a cleanup item to clarify these fees are deposits based on conformance with the FCC Order #18-133, allowing the City to recover actual costs.
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
B. Table 3a. Inclusionary Housing
Pursuant to City Council Resolution 16-6042.4, the in lieu fee for inclusionary housing for market-rate ownership projects is to be increased to $10 per square foot.
Permit Center Fees (Pages 9-18, Schedule D, various line items) Building Division
C. Table D Various Fees Based on Hourly Rates
Multiple fees are directly based on employee hourly rates. These fees are updated to match new employee hourly rates per Table T1. Where multiple positions charge the same fee, an average of the position hourly rates is used.
D. Table 3a Various Fees Based on Hourly Rates
Multiple fees are directly based on employee hourly rates. These fees are updated to match new employee hourly rates per Table T1. Where multiple positions charge the same fee, an average of the position hourly rates is used.
E. Table 3a D.10 Residential Window/Door Replacement Inspection Fee These fixed fees are based off the hourly inspection rate, average time spent for each inspection and number of inspections per permit. After review of the average number of inspections performed on completed window permits over the past year, these fees were adjusted to accurately reflect the total inspection time spent for each type of window permit.
Permit Center Fees (Pages 9-23, Schedule D and Table 3a, various line items) IV. Annual Sewer Service Charge
The City Council adopted Resolution No. 19.6042.1 on April 23, 2019 amending Exhibit A to Resolution No. 78-6042 and adopting Ordinance No. 19-3 on May 28, 2019, establishing Annual Sewer Service Charges. The Director of Public Works has recommended that the City Council approve collection of established Annual Sewer Service Charges at a rate which is currently set by Resolution No. 20-6042.3 and adopted by the City Council of the City of Concord on June 2, 2020.
Annual Sewer Service Charge (Page 24, Table T4, various line items) V. Police
Due to increases in operating costs for taxicab companies and tow operators, staff recommends increases to the following fees to aid in cost recovery.
A. Taxicab Rates
The City of Concord taxicabs are regulated pursuant to Municipal Code
5.95.300(d). Although not a fee collected by the city, the Master Fee Schedule
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
sets the maximum rate taxicab companies may charge. The last adjustment of those fees occurred in 2014. There are five companies permitted to provide taxicab service in the City. There has been an expressed request to raise rates as a response to increased operating costs. These five companies were surveyed for input on rate increases. The proposed fee adjustments are an average of their responses. These proposed fees were found to be comparable to other regulated taxicab rates in the region.
B. Franchise Tow Fees
Tow operators who provide City-related towing services are part of the City of Concord Towing Services Franchise Program. Tow operators enter into a Franchise Tow Agreement with the City where Tow Operators are placed on the City’s Rotation List in exchange for payment of a Franchise Fee and adherence to the conditions and regulations imposed in that agreement. Increasing the Franchise Fee is recommended to cover the associated staff cost of operation and management of this program.
All Police Fees (Pages 25, Schedule E, various line items) VI. Sanitation and Refuse Fees
Mount Diablo Resource Recover (MDRR) is the City of Concord’s Franchise hauler, recycler, and disposer of the City’s waste. Waste disposal includes garbage, recyclables, organic materials, construction and demolition debris, and drop box services. Rates for these services must be adjusted in response to Senate Bill (SB) 1383, which went into effect on January 1, 2022. SB 1383 can be summed up as a requirement to divert food waste from being landfilled. In order for MDRR to divert food waste in compliance with SB 1383, it must complete operational changes and capital improvements including where solid waste is hauled, expansion and modification of existing facilities, new programs such as food waste recovery, education, and enforcement.
As discussed in further detail below, City staff negotiated the needed contract and rate modifications with MDRR while updating and seeking direction from the Infrastructure & Franchise Committee. Public meetings were held for this purpose on March 25, 2021, June 28, 2021, November 8, 2021, February 9, 2022 and March 23, 2022. The Infrastructure & Franchise Committee was unanimous on the need to increase rates in order to comply with the law; however, Committee members were not unanimous on the preferred approach for increasing rates. Council is being asked to choose one of five scenarios for increasing rates over the next five years, two of which are preferred by the Committee (additional details are below). These rates are reviewed and adjusted through a formal Base Year Rate Application that is submitted by MDRR.
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
R3, the City’s solid waste consultant, has completed its review of Mount Diablo Resource Recovery 2022 Base Year Rate Application. As a result of the review, R3 is recommending adjustments to MDRR’s Rate Application, from a one-time rate increase of 27.11% to a one-time increase of 21.55%. R3 has reviewed all adjustments with MDRR, and MDRR concurs with R3’s findings and is accepting of the resultant 21.55% one-time rate adjustment calculation. This 21.55% adjustment translates to a range of $7.57 – $12.56 increase to the monthly rate, depending on container size. Details regarding R3’s review methodology and specifics regarding the recommended adjustments are included in Attachment 3.
To summarize, R3’s recommended adjustments to the Rate Application include:
$9,100 reduction to incorporate overhead costs based on the allowances described in the City’s Rate Manual.
$60,300 increase in allowed costs to reimburse City for an additional half- time recycling coordinator/diversion specialist/city compliance officer for SB 1383 compliance and enforcement, debris box enforcement, and recycling theft prevention.
$762,000 decrease in 2022 tipping fee costs. Further increases to tipping fees will occur in 2023 and 2024 via the annual indexed rate adjustment process (called the “Refuse Rate Index” or “RRI”) and are due to City of Pittsburg approved increases in tipping fees for SB 1383 and other factors.
$398,600 reduction to MDRR’s profit calculation in accordance with the City’s Rate Setting Manual and the adjustments identified above. $330,500 increase in allowed costs for additional debris boxes for City clean-up events, as requested by the City.
$121,000 reduction in calculated City franchise fees resulting from the adjustments above.
Overall, the above represent a decrease of $900,000 in annual revenues needed to cover the cost of solid waste services as compared to those included in MDRR’s rate application, yielding a 21.55% one-time rate adjustment. That adjustment is generally comprised of the following categories:
Negotiated adjustments for increase services:
0.49% increase for an additional half-time enforcement officer, relating to implementation of SB 1383 requirements and enforcement of exclusive debris box rights
2.08% increase for additional debris boxes for City clean-up events, up to the maximum allowed under the agreement.
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
Standard cost increases since 2019 (no adjustments made in 2020 and 2021):
1.47% increase due to incorporating the additional costs of recycling into the base rate, replacing and reducing the prior temporary Residential Recycling surcharge
4.65% increase due to changing operating expenses, such as labor, trucking, and CPI on current tipping fees. It should be noted that no annual RRI rate adjustment was made in 2020 or 2021 to shield ratepayers from the impacts of the COVID-19 pandemic, so this incorporates increases spanning from 2019 to 2022.
Increases for unfunded state mandates:
5.58% increase due to long-term planned fleet update for compliance with California Air Resource Board (CARB) regulations.
7.28% increase due to implementing SB 1383, including: higher tipping fees to funding increase composting processing costs with introduction of food waste as well as needed capital improvements at the transfer station; additional organics collection routes; new color-compliant carts, lids and labels; new residential and multi-family food scrap pails; new outreach and education activities; and SB 1383 compliance services such as contamination audits and others included in the Amendment to the Franchise Agreement.
Note that the each of the above include any associated MDRR profits and City franchise fees. Overall, R3 found MDRR’s rate application to be complete and reasonable given the context of the changes in the solid waste marketplace that are driven by outside factors. These outside factors include new State regulations (SB 1383 and CARB), changes in the recycling marketplace (which previously prompted MDRR’s special extraordinary request for rate adjustment via the Recycling Surcharge), changes in City services, and normally expected changes in operating costs.
Though the adjusted one-time rate increase for 2022 would be 21.55% as calculated by R3, MDRR is agreeable to spreading the rate adjustment out over a five-year period. Staff, R3 and MDRR prepared four scenarios for a five-year rate adjustment. The Infrastructure & Franchise Committee reviewed the four scenarios, and recommended that the Council consider either Scenario 2, which provides for the lowest overall increase in 2022, or Scenario 4, which evens out the increase over the five-year period.
The scenarios for City Council consideration are below; the corresponding customer bill amounts for each scenario is provided in Attachment 4.
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
One-Time Increase – 21% increase in 2022 followed by four years of RRI ranging from 3.50 to 5.15%.
Scenario 1 – 14% increase in 2022 followed by four years of RRI plus
3.22%.
Scenario 2 – 3% increase in 2022 followed by four years of RRI plus
8.34%.
Scenario 3 – 6.6% increase in 2022 followed by four years of RRI plus
6.6%.
Scenario 4 – 9.76% increase in 2022 followed by RRI plus 4.61% in 2023 and 2024 and RRI plus 6.26% in 2025 and 2026 (with the intention of having the resulting rate adjustment in all five years be at or around
9.76%).
Each of these scenarios was developed to achieve the same overall amount of revenue to MDRR, amounting to $105.9 million from 2022 through 2026.
Additionally, the scenarios assume a base RRI of 3.5%, which is consistent with historical indexed rate adjustments. However, future RRI adjustments starting in 2023 will be impacted in two ways. First, the RRI in 2023 and 2024 will include the effects of known City of Pittsburg approved increases in tipping fees at the transfer station, which are estimated at an additional 1.65% each year. Second, it is likely that inflation will result in higher RRI increases, though the precise effects of inflation cannot be known at this time, and thus are not included in this analysis.
The City’s Rate Setting Manual caps annual RRI adjustments at 7%. With the combined effects of inflation and the known tipping fee adjustments in 2023 and 2024, it is possible that future RRI calculations will exceed 7%. If that becomes the case, it is anticipated that MDRR may request a special extraordinary adjustment to the rates, as it did previously for the now sunsetting Residential Recycling Surcharge.
To assist the Council in considering the four scenarios for spreading the rate increase out over five years, R3 prepared a comparison of the City’s current residential rates to the rates in surrounding communities. This comparison is shown in Table 1, below, and includes the City’s projected 2022 rates via a one- time 21.55% rate increase as well as the year 1 rate increases for each of the four phased-in rate increase scenarios. It should be noted that the City’s current residential rates are well below the average, ranging from $5.49 (14%) below the average for the 32-gallon monthly rate, $21.04 (31%) below for the 64-gallon rate, and $41.49 (42%) below the average for the 96-gallon monthly rate.
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
Table 1: Residential Solid Waste Rate Comparison
Jurisdiction 32 Gallon 64 Gallon 96 Gallon
Orinda $54.50 $102.23 $153.46
Kensington $49.04 $98.03 $147.07
Richmond $45.20 $85.29 $126.59
Hercules $41.67 $73.61 $106.56
Lafayette $38.94 $73.47 $110.19
San Ramon $42.05 $72.54 $115.53
Pinole $40.63 $72.47 $105.43
San Pablo $35.06 $67.87 $101.73
Concord (MDRR Proposed One-Time) $44.67 $60.39 $74.05
Oakley $41.69 $65.92 $66.13
Concord (R3 Adjusted) One-Time $42.71 $57.75 $70.82
Pittsburg $46.38 $55.89 $62.75
Danville $32.55 $55.36 $82.19
Concord (R3 Adjusted) Scenario 1 - Year 1 $40.06 $54.16 $66.42 Concord (R3 Adjusted) Scenario 4 - Year 1 $38.57 $52.15 $63.95 Antioch $31.92 $51.52 $60.51
Concord (R3 Adjusted) Scenario 3 - Year 1 $37.46 $50.65 $62.11 Walnut Creek $26.74 $50.51 $75.43
Concord (R3 Adjusted) Scenario 2 - Year 1 $36.19 $48.94 $60.01 Martinez $38.80 $47.68 $90.84
Concord (Current) $35.14 $47.51 $58.26
Pleasant Hill $31.66 $42.77 $63.61
Average without Concord $40.63 $68.55 $99.75
Concord's Current Rates Minus Average -$5.49 -$21.04 -$41.49 % Difference -14% -31% -42%
Notably, via all of the five-year rate adjustment scenarios, the City’s rate would remain below the average rates for the comparable communities.
Sanitation and Refuse Fees (Page 26, Schedule F, various line items)
City Council Agenda Report
Agenda Item No. 6.a
May 3, 2022
Environmental
Pursuant to the California Environmental Quality Act of 1970, Public Resources Code §21000, et seq., as amended and implementing State CEQA Guidelines, Title 14, Chapter 3 of the California Code of Regulations (collectively, “CEQA”), the updates to the City’s Master Fees and Charges Schedule do not constitute a “project” within the meaning of Public Resources Code Section 21065, 14 Cal Code Reg. Section 15060(c)(2), 15060(c)(3), or 15378 because the fiscal activities do not involve a commitment to a specific project, it has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment. In addition, the proposed amendments are categorically exempt pursuant to Section 15061(b)(3), “Review for Exemptions” of the CEQA Guidelines because there is no possibility that the updates to the City’s Master Fees and Charges Schedule may have a significant effect on the environment, and no unusual circumstances are present. Accordingly, further environmental review is required.
Financial Impact
Policy & Procedure No. 170 requires the annual updating of the City’s fees and charges.
The recommended fee updates listed in Attachment 1 could recover an additional $146,000 in FY 2022-23, which is offset by the costs of providing these fee services.
Public Contact
Notice of this hearing was published in the East Bay Times, as required by State Law and the Concord Municipal Code. The City Council Agenda was posted. Interested parties who have expressed an interest in this topic were notified as well as current contractors doing business with the City, the California Building Industry Association and NARI (National Association of the Remodeling Industry) of Diablo Valley, and the Concord Chamber of Commerce.
Attachments
1. Resolution Amending Resolution No. 78-6042
2. Policy and Procedure No. 170
3. R3 Consulting – Sanitation and Refuse Fees Base Year Rate Adjustment Final Report
4. Sanitation and Refuse Fees Phased-In Rate Increase by Dollar Amount
Res No. 22-6042.1 1
BEFORE THE CITY COUNCIL OF THE CITY OF CONCORD
COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA
A Resolution Amending Exhibit A to Resolution No.
78-6042 (Establishing Fees and Charges for Various
Municipal Services in the City of Concord) Resolution No. 22-6042.1 /
WHEREAS, the City Council provides a variety of municipal services; and WHEREAS, the City Council adopted Resolution No. 78-6042 on October 9, 1978, establishing a master resolution within which various municipal fees and charges would be located; and
WHEREAS, amendments to Exhibit “A” to Resolution No. 78-6042 are necessary to establish or delete various fees; and
WHEREAS, the Director of Finance has recommended that the City Council approve an amendment to certain fees which are currently set forth in Exhibit “A” to this Resolution No. 22- 6042.1; and
WHEREAS, the City Council has considered and provided direction to staff on which base rates to adopt for Sanitation and Refuse fees; and
WHEREAS, the City Council, at its meeting of May 3, 2022, received a report from the Director of Finance identifying the need for such changes; and WHEREAS, the City Council held public hearing on May 3, 2022, at which time any and all members of the public were afforded an opportunity to address the City Council regarding this matter; and
WHEREAS, upon close of the public hearings the City Council deliberated upon the information received during the course of the public hearings.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF CONCORD DOES RESOLVE AS FOLLOWS:
Section 1. The foregoing recitals are incorporated by reference. Pursuant to the California Environmental Quality Act of 1970, Public Resources Code §21000, et seq., as amended and implementing State CEQA Guidelines, Title 14, Chapter 3 of the California Code of Regulations Attachment 1
Res No. 22-6042.1 2
(collectively, “CEQA”), the updates to the City’s Master Fees and Charges Schedule do not constitute a “project” within the meaning of Public Resources Code Section 21065, 14 Cal Code Reg. Section Attachment 1 Res No. 21-XX 2 15060(c)(2), 15060(c)(3), or 15378 because the fiscal activities do not involve a commitment to a specific project, it has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment.
In addition, the proposed amendments are categorically exempt pursuant to Section 15061(b)(3), “Review for Exemptions” of the CEQA Guidelines because there is no possibility that the updates to the City’s Master Fees and Charges Schedule may have a significant effect on the environment, and no further environmental review is required. No unusual circumstances are present. This determination reflects the City’s independent judgment and analysis.
Section 2. Exhibit “A” to Resolution No. 78-6042 is amended as recommended.
Section 2. The fees established by this resolution shall become effective on July 1, 2022 as indicated in Exhibit “A” with two exceptions: 1) Special Events fees which become effective September 1 of each year, and 2) certain fees in Parks & Recreation which become effective January 1 or June 1 of each year.
Section 4. This resolution shall become effective immediately upon its passage and adoption. //
//
//
//
//
//
//
//
//
//
//
//
Res No. 22-6042.1 3
PASSED AND ADOPTED by the City Council of the City of Concord on May 3, 2022, by the following vote:
AYES: Councilmembers -
NOES: Councilmembers -
ABSTAIN: Councilmembers -
ABSENT: Councilmembers -
I HEREBY CERTIFY that the foregoing Resolution No. 22-XX was duly and regularly adopted at a regular meeting of the City Council of the City of Concord on May 3, 2022.
Joelle Fockler, MMC
City Clerk
APPROVED AS TO FORM:
Susanne Meyer Brown
City Attorney
Attachment: Exhibit A - Amendments to Fees and Charges for Various Municipal Services
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
A. Administrative Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21‐6042.1
Num Description Current Fee Deposit
Proposed
Changes
Effective
7/1/22
Date last
updated
A. Administrative Fees
1. Appeals to City Council 7/1/2016
1.1. Appeals requiring public notice (CMC 2.05.040) 138.00 7/1/2019 Plus Public Notification fee
1.2. Appeals where public notice is not required (CMC 2.05.050) 138.00 7/1/2019
2. City Employee Services 7/1/2016
2.1. Hourly rates charged for special services requested that are provided by City employees. These hourly rates will also be used to calculate compliance with the California Uniform Public Construction Cost Accounting Act. Table 1 7/1/2016
2.2. These hourly rates are used to calculate billable hourly rates. Billable hourly rates are defined to be the sum of the Productive Hourl
y rate plus the citywide indirect cost rate. Table 1 7/1/2016
3. City Employee Services – Special Events Blended Rates (P&P No. 143)
3.1. Public Works – Maintenance 106.00 109.00 7/1/2021
3.2. Public Works – Maintenance – Limited Services 26.00 27.00 7/1/2021
3.3. Police Officer 169.00 174.00 7/1/2021
3.4. Police Reserves (pass through) as quoted by Police Department Actual Costs 1/1/2017
3.5. Materials and Equipment at cost Actual Costs . 1/1/2017
3.6 A Discount of 20% provided to City of Concord residents and businesses (not applicable to Police Reserves and Materials and E
quipment)
3.7 Deposit of 25% required at least two weeks prior to Event Actual Costs 1/1/2017
4. City Franchise and Telecommunication Agreement Fees Hourly rates charged for staff time devoted to work on City franchise and telecommunication agreements. See A.2 7/1/2012
4.1. Deposit for small projects (replenish as needed) 5,000.00 7/1/2009
4.2. Deposit for large projects (replenish as needed) 10,000.00 7/1/2009
5. Copies including Public Records/Information 7/1/2016
5.1. Photo copy– page size not to exceed 11”x17” 4/28/1986
5.1.1. Each page 0.10 2/2/1999
5.2. Print from microfilm (each print) 3.00 7/1/2014
5.3. Print copy– oversized page exceeding 11”x17” such as maps, drawings, plans, etc.
5.3.1. Cost of production Actual Costs .
5.3.2. Or
Actual cost 7/1/2016
5.4. Extract of document and certification
(each page) 21.00 7/1/2018
5.5. Certifying documents, Live Certificates (each document) 34.00 7/1/2019
5.6. Budget (Vol. I and II), Capital Improvement Program, and Annual Financial Report (per copy) 100.00 7/1/2019
5.7. Business License Listings
5.7.1. Staff provided Electronic copy of business license list 52.00 7/1/2019
5.7.2. Business license list copied to CD 59.00 7/1/2019
6. Housing Rehabilitation Loan Fees
6.1. Loan Origination Fee 103.00 7/1/2019
6.2. Plus other loan administrative costs. This includes but is not limited to title, lien, registration appraisal, inspections and other loan
processing costs Actual Costs . 7/1/2007
7. Inspection/Abatement Warrants
7.1. Fee charged per warrant 465.00 7/1/2019
8. Mobile home Rent Review Fees
Exhibit A to Attachment 1
1
Date of Last Adoption: 4‐27‐2021
Res. No:21‐6042.1
Job Code Description
Current
Productive
Hourly Rate
Proposed
Changes
Effective
7/1/22
4156 Account Clerk I 67.62 69.65
4154 Account Clerk II 70.98 80.57
4155 Account Clerk III 95.58 97.37
3530 Accountant II 153.90 170.12
4153 Accounts Payable Team Leader 118.95 128.36
2307 Administrative Analyst 180.97 193.98
4586 Administrative Clerk II 94.59 95.24
4584 Administrative Clerk III 98.06 109.14
3711 Administrative Coordinator 141.41 157.41
4570 Administrative Secretary 103.59 113.34
2315 Administrative Services Manager 206.89 225.42
3114 Assistant Engineer 177.20 188.93
3134 Assistant Planner 117.46 133.16
3113 Associate Civil Engineer 189.06 206.19
3132 Associate Planner 143.76 155.68
4760 Automotive Parts Worker 97.15 110.37
2342 Budget Analyst 166.94 186.77
2324 Budget Officer 243.12 261.08
3375 Building Inspection Supervisor 180.15 192.08
3374 Building Inspector 139.38 147.79
9531 Camp Director 123.80 132.06
2130 Chief Building Official 238.75 264.20
1321 City Clerk 219.42 237.34
2120 City Engineer 268.02 286.96
3376 Code Enforcement Officer 120.47 129.83
2334 Community Relations Manager 178.11 191.23
7126 Community Service Officer 96.48 104.08
2377 Community Services Manager 147.97
2133 Concord Reuse Area Planner 228.01 255.63
3377 Construction Inspection Supervisor 168.30 179.41
3354 Construction Inspector 136.11 137.26
3759 Deputy City Clerk 161.76 180.81
2134 Economic Development Manager 209.76 225.17
3135 Economic Development Specialist 144.57 164.02
6412 Equipment Mechanic 120.51 132.43
4564 Exec.Assistant - Council/Mgr. 140.80 157.44
4566 Executive Legal Seretary 137.35 147.37
4569 Executive Secretary 118.34 129.69
2710 Facilities Maintenance Manager 230.73 247.88
6542 Facilities Maintenance Tech 112.15 119.40
2322
Financial Operations Manager 229.07 246.08
6722 General Laborer 56.02 57.70
6314 Heavy Equipment Operator I 110.78 123.09
6312 Heavy Equipment Operator II 115.04 131.08
2312 Housing Manager 211.83 225.57
3798 Housing Program Analyst 147.51 159.83
2356 Human Resources Analyst II 174.87 187.58
4580 Human Resources Specialist 126.54 135.68
4585 Human Resources Technician II 123.44 132.07
2331 Information Technology Manager 197.87 231.22
6616 Landscape Gardener 116.23 124.83
Table 1 - City Employee Hourly Rates for Services FY 2021-22 2022-23 2
Date of Last Adoption: 4‐27‐2021
Res. No:21‐6042.1
Job Code Description
Current
Productive
Hourly Rate
Proposed
Changes
Effective
7/1/22
Table 1 - City Employee Hourly Rates for Services FY 2021-22 2022-23 4351 Lead Dispatcher 149.21 161.33
6562 Lead Maintenance Collection System Worker 131.08
6552 Maintenance Collection System Worker 115.08
6532 Maintenance Electrician 144.68 158.61
6614 Maintenance Gardener 114.13 124.87
6522 Maintenance Painter 129.46 141.80
2727 Maintenance Superintendent 204.30
6426 Maintenance Utility Mechanic 127.01 139.23
6714 Maintenance Worker I 78.58 89.19
6712 Maintenance Worker II 98.10 107.10
2518 Parks Manager 214.55 240.41
4158 Payroll Specialist 138.65 154.54
4160 Payroll Technician 123.44 132.07
3341 Permit Center Technician I 78.66 88.94
3342 Permit Center Technician II 109.57 120.34
3343 Permit Center Technician III 110.31 120.97
3140 Plan Check Engineer 178.39 194.98
2123 Planning Manager 253.21 275.54
3336 Planning Technician 120.97
2921 Police Captain 380.18 408.92
4352 Police Dispatcher I 118.85 128.26
4353 Police Dispatcher II 138.87 153.30
2923 Police Lieutenant 326.13 357.78
7115 Police Officer 214.23 230.57
4554 Police Records Clerk III 95.84 103.57
2332 Police Records Manager 127.66 170.55
7114 Police Sergeant 271.94 291.11
2132 Principal Planner 209.06 225.17
3630 Program Assistant 117.07 126.37
2520 Program Manager 174.23 187.35
3701 Programmer Analyst 141.89 146.29
6114 Public Works Lead Worker 121.37 132.87
3378 Public Works Supervisor 157.99 169.80
2360 Purchasing Agent 178.61 201.07
3640 Recreation and Special Events Program Coordinator 124.37 133.46 2520 Recreation Program Manager 174.23 187.35
9555 Recycling Theft Prevent Spec 88.51 95.73
4569 Reuse Project Exec. Assistant 118.34 129.69
4159 Revenue Generation Team Leader 126.88 136.96
1706 Senior Assistant City Attorney 293.12 315.06
3369 Senior Building Inspector 150.30 160.08
2150 Senior Civil Engineer 222.41 236.20
7122 Senior Crimes and Intelligence Analyst 172.65 187.10 6130 Senior Equipment Mechanic 137.93 151.20
2338 Senior Financial Analyst 204.86 220.04
2352 Senior Human Resources Analyst 195.87 211.07
6120 Senior Maintenance Team Leader 124.65 140.54
3130 Senior Planner 162.70 176.30
3703 Senior Programmer Analyst 145.14 157.09
3706 Senior Systems Analyst 149.17 161.71
6510 Senior Traffic Signal Tech 154.78 169.76
3
Date of Last Adoption: 4‐27‐2021
Res. No:21‐6042.1
Job Code Description
Current
Productive
Hourly Rate
Proposed
Changes
Effective
7/1/22
Table 1 - City Employee Hourly Rates for Services FY 2021-22 2022-23 3570 Supervising Accountant 190.96 206.51
6324 Sweeper Operator 96.63 111.07
2327 Systems and Programming Manager 201.15 214.49
2329 Systems Manager 209.76 225.17
6511 Traffic Signal Technician 137.56 150.75
2118 Transportation Manager 244.78 259.12
2151 Transportation Program Mgr. II 209.68 226.01
6166 Tree Lead Worker 121.37 130.04
6615 Tree Trimmer 108.84 119.34
9557 Vehicle Abatement Officer 72.98 97.49
4
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
B. Business Professional Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21‐6042.1
Num Description Current Fee
Proposed
Changes
Effective
7/1/22
Date last
updated
B. Business, Professions and Trades Fees
1. Administrative Processing Fee for Business License or Permits 7/1/2016
1.1. Administrative processing fee renewal of license or permits in person or hard copy 21.00 22.00 7/1/2021
1.2. Administrative processing fee renewal of license or permits online 0.00 7/1/2016
1.3. Administrative processing fee issue of new license or permits in person or hard copy 21.00 22.00 7/1/2021
1.4. Administrative processing fee issue new license or permits online 0.00 7/1/2016
1.5. Business License Exemption Audit Fee 266.00 274.00 7/1/2021 5
Exhibit A. Resolution 78 6042
Fees and Charges for Various Municipal Services
C. Parks and Recreation Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21‐6042.1
Num Description Current Fee Deposit Date last
updated Proposed Changes
2.3.1.2.2. Weekday 16-30 Participants 250.00 6/1/2020
2.3.1.2.3. Weekend 1-15 Participants 165.00 6/1/2020
2.3.1.2.4. Weekend 16-30 Participants 295.00 6/1/2020
2.4. Technology Fee
2.4.1. Concord Communit y Pool
2.4.1.1. Swim Card/Pass $99 or less 3.00 6/1/2020
2.4.1.2. Swim Card/Pass $100 to 199 4.00 6/1/2020
2.4.1.3. Swim Card/Pass $200 or more 5.00 6/1/2020
2.4.1.4. Picnic Pavilion Rentals 6.00 6/1/2020
3 Athletic Fields & Courts
3.1. Field Reservations
3.1.1. Technology Fee (Per permit, based on group size & type (profit/non-profit) 2% to 5% of rental fees 7/1/2020
3.1.2. Cancellation/Reschedule/Permit Changes 30.00 7/1/2017
3.2. Reserved Use Fee – Resident/Concord Based Non-Profit /School 7/1/2008
3.2.1. Youth Groups/Pro grams (per field per hour) 15.00 1/1/2022
3.2.2. Adult Groups/Programs (per field per hour) 37.00 7/1/2017
3.3. Reserved Use Fee – Non Resident / Commercial / For Profit 7/1/2008
3.3.1. Youth & Adult Groups/Programs (per field per hour) 42.00 7/1/2017
3.4. Tournaments - Youth & Adult (per field per hour)
(Applies when entrance fees or team participation fees are charged.) 23.00 1/1/2020
3.4.1 Tournament: Cancellation Fee (Less than two (2) weeks notice) 100.00 7/1/2016
3.4.2 Technology Fee - per day 11.00 1/1/2020
3.5. Ballfield Prep - Infields (per prep) 40.00 7/1/2021
3.6. Field Lights 7/1/2012
3.6.1. Willow Pass Communit y Park (per field per hour) 36.00 7/1/2021
3.7. Baldwin Park Bocce Courts 7/1/2012
3.7.1. Reserved Use Fee – Resident (per court per hour) 15.00 7/1/2012
3.7.2. Reserved Use Fee – Non-Resident (per court per hour) 25.00 7/1/2012
3.7.3. Refundable Damage Deposit (Tournaments, Clinics, Special Events) 200.00 7/1/2012
3.7.4. Bocce equipment rental (per set) 5.00 7/1/2014
3.7.5 Technology Fee - per day 3.00 7/1/2019
3.8 Pickleball Courts
3.8.1 General Reserved Court Use
3.8.1.1. Annual Pass 72.00 7/1/2021
3.8.1.2. Court Rental - Passholder (per court, per hour) 6.00 7/1/2021
3.8.1.3. Court Rental - Non Passholder (per court, per hour) 10.00 7/1/2020
3.8.1.4. Technology Fee - per day 3.00 7/1/2018
3.8.2. Tournaments (Minimum length 4 hours)
3.8.2.1 Court Rental - per court, per hour (Minimum 8 courts) 6.00 7/1/2021
3.8.2.2. Technology Fee - per day 12.00 7/1/2020
3.8.3. Clinics/Events (non-tournament) (Minimum length 2 hours)
3.8.3.1. Court Rental - per court, per hour (Minimum 4 courts) 6.00 7/1/2021
3.8.3.2. Technology Fee - per day (7 or less courts) 7.00 7/1/2020
3.8.3.3. Technolo gy Fee - per day (8 or more courts) 12.00 7/1/2020
3.8.4. On going/Long Term Rentals
3.8.4.1. Court Rental - per court, per hour (subject to booking volume) 4.25-6.00 7/1/2021
3.8.4.2. Technolo gy Fee - per month 8.00 1/1/2022
3.9 Tennis Courts
3.9.1 General Reserved Court Use
3.9.1.1. Annual Pass 72.00 7/1/2021
3.9.1.2. Court Rental - Passholder (per court, per hour) 7.00 7/1/2021
3.9.1.3. Court Rental - Non Passholder (per court, per hour) 12.00 7/1/2020
3.9.1.4. Technology Fee - per day 3.00 7/1/2018
3.9.2. Tournaments (Minimum length 4 hours)
3.9.2.1. Court Rental - per court, per hour (Minimum 4 courts) 7.00 7/1/2021
3.9.2.2. Technology Fee - per day 12.00 7/1/2020
3.9.3. Clinics/Events-
(non-tournament) (Minimum length 2 hours)
3.9.3.1. Court Rental - per court, per hour (Minimum 2 courts) 7.00 7/1/2021
3.9.3.2. Technology Fee - per day 7.00 7/1/2020
3.9.4. Ongoing/Long Term Rentals
3.9.4.1. Court Rental - per court, per hour 7.00 7/1/2021
3.9.4.2. Technology Fee - per month 8.00 1/1/2022
4 Camp Concord Effective 10/1/22
4.1 Group Rental Rates
4.1.1. Per Person/per night: Subject to group size, nights, activities and meals 45.00 - 170.00 7/1/2021
46.00-175.00
4.1.2. Technology Fee - Organizations: per reservation based on group type (profit/non-profit) and group size 20.00-100.00
7/1/2020
100.00-1,000.00
4.1.3 Technology Fee - Non-Organizations: per person, per reservation based on
group structure 7.00 - 25.00 7/1/2021
5 Alcohol Use Permit 7/1/2016
6
Exhibit A. Resolution 78 6042
Fees and Charges for Various Municipal Services
C. Parks and Recreation Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21‐6042.1
Num Description Current Fee Deposit Date last
updated Proposed Changes
6.2.5.1.3.1 Saturday Package - Additional Hourly Rate
185.00 7/1/2021
6.2.5.1.4 Meeting rooms (per hour) (Friday evening, Saturday and Sunday Saturday) 61.00 7/1/2020
6.2.5.2. Weekday Rentals
6.2.5.2.1 Main Hall (per hour) (Monday - Friday before 5pm) 94.00 7/1/2020
6.2.5.2.2 Meeting Rooms (per hour) (Monday - Friday before 5pm) 50.00 7/1/2020
6.2.5.2.3 Main Hall - Weekday Package 9 hours 810.00 7/1/2021
6.2.5.2.3.1 Weekday Package - Additonal Hourly Rate
90.00 7/1/2021
6.2.5.3. Holiday Rentals
6.2.5.3.1. Main Hall (per hour) 248.00 7/1/2021
6.3. Senior Center
6.3.1. Refundable Damage Deposit - Wisteria Hall 750.00 7/1/2011
6.3.2. Refundable Damage Deposit - 1/2 Wisteria Hall 375.00 7/1/2018
6.3.3. Refundable Dama ge Deposit - Classroom (Full) 250.00 7/1/2011
6.3.4 Refundable Damage Deposit - 1/2 Classroom, Dianda and Garaventa Rooms 100.00 7/1/2011
6.3.5. Resident Rate
6.3.5.1. Weekend Rentals
(Friday, Saturday and Sunday)
6.3.5.1.1 Wisteria Hall (Saturday & Sunday, 9 hours, Includes stage and kitchen) 1,600.00 7/1/2019
6.3.5.1.2 Hourly rate (Friday, Saturday) 195.00 7/1/2018
6.3.5.1.3 Hourly rate (Sunday) 145,00 7/1/2018
6.3.5.1.4 Audio visual charge 50.00 7/1/2009
6.3.5.1.5 Lounge 125.00 7/1/2016
6.3.5.1.6 Hallway adjacent to Wisteria Hall 75.00 7/1/2016
6.3.5.1.7 1/2 Wisteria Hall (Friday & Saturday) per hour 110.00 7/1/2018
6.3.5.1.8 1/2 Wisteria Hall (Sunday) per hour 100.00 7/1/2018
6.3.5.2. Weekday (Per hour rental, minimum 2 hrs. between the hours of 8am - 5
pm)
6.3.5.2.1 Wisteria Hall 125.00 7/1/2008
6.3.5.2.2 1/2 Wisteria Hall - New 90.00 7/1/2018
6.3.5.3. Weekday and Weekend Rentals (Minimum 4 hours)
6.3.5.3.1 Classroom (Full) (per hour) 80.00 7/1/2008
6.3.5.3.2 1/2 Classroom (per hour) 40.00 7/1/2008
6.3.5.3.3 Audio visual charge 25.00 7/1/2011
6.3.5.3.4 Dianda and Garaventa Rooms (per hour) 25.00 7/1/2008
6.3.6. Non Resident Rate
6.3.6.1. Weekend Rentals (Friday, Saturday and Sunday)
6.3.6.1.1 Wisteria Hall (Saturday & Sunday, 9 hours, Includes stage and kitchen) 1,760.00 7/1/2020
6.3.6.1.2 Hourly rate (Friday, Saturday) 215.00 7/1/2020
6.3.6.1.3 Hourly rate (Sunday) 160.00 7/1/2020
6.3.6.1.4 Audio visual charge 55.00 7/1/2020
6.3.6.1.5 Lounge 140.00 7/1/2021
6.3.6.1.6 Hallway adjacent to Wisteria Hall 85.00 7/1/2021
6.3.6.1.7 1/2 Wisteria Hall (Friday & Saturday) per hour 125.00 7/1/2021
6.3.6.1.8 1/2 Wisteria Hall (Sunday) per hour 110.00 7/1/2020
6.3.6.2. Weekday (Per hour rental, minimum 2 hrs. between the hours of 8am - 5
pm)
6.3.6.2.1. Wisteria Hall 140.00 7/1/2021
6.3.6.2.2. 1/2 Wisteria Hall - New 100.00 7/1/2021
6.3.6.3. Weekday and Weekend Rentals (Minimum 4 hours)
6.3.6.3.1 Classroom (Full) (per hour) 90.00 7/1/2021
6.3.6.3.2 1/2 Classroom (per hour) 45.00 7/1/2021
6.3.6.3.3 Audio visual charge 30.00 7/1/2021
6.3.6.3.4 Dianda and Garaventa Rooms (per hour) 30.00 7/1/2021
6.4. Bud Hansen Wisteria Arbor
6.4.1. Refundable Damage Deposit 300.00 7/1/2008
6.4.2. Weekend Rentals (Available Saturday and Sunday 9am - 6pm)
6.4.2.1. Residents (3-hour continuous block) 600.00 7/1/2019
6.4.2.2. Non-Residents (3-hour continuous block) 660.00 7/1/2020
6.5. Facilit y Rental Technology Fee
6.5.1 Non Recurrin g Events 5% of rental fees 7/1/2020
6.5.2 Recurring Events - Annual contracts-ongoing monthly/weekly bookings - Monthl
y Fee 2%-5% of rental fees 7/1/2020
7 Diablo Creek Golf Course (P&P No. 56) 7/1/2016 Effective 7/1/22
7.1. Daily Green Fees
7.1.1. Weekda ys - Monday through Friday
7.1.1.1. 9 holes (resident) 23.00 7/1/2021
7.1.1.2. 9 holes (non-resident) 25.00 7/1/2021
7.1.1.3. 18 holes (resident) 30.00 7/1/2021
7.1.1.4. 18 holes (non-resident) 36.00 7/1/2021 37.00
7.1.1.5. Twilight/Late Rate (Approximately 4-5 hours before dusk) 22.00 7/1/2019 7
Exhibit A. Resolution 78 6042
Fees and Charges for Various Municipal Services
C. Parks and Recreation Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21‐6042.1
Num Description Current Fee Deposit Date last
updated Proposed Changes
7.1.1.6. Super Twilight (2-3 hours before dusk) 18.00 7/1/2019 20.00
7.1.1.7. Seniors (resident) 24.00 7/1/2020
7.1.1.8. Seniors (non-resident) 28.00 7/1/2021
7.1.1.9. Junior (18 years & under) (resident) 15.00 7/1/2019
7.1.1.10. Junior (18 years & under) (non-resident) 17.00 7/1/2019
7.1.1.11. First Tee Student 14.00 7/1/2020
7.1.2. Weekends–Saturday, Sunday and Holidays
7.1.2.1. 9 holes (resident) 25.00 7/1/2020
7.1.2.2. 9 holes (non-resident) 30.00 7/1/2021
7.1.2.3. 18 holes (resident) 40.00 7/1/2021 41.00
7.1.2.4. 18 holes (non-resident) 46.00 7/1/2021 48.00
7.1.2.5. Twilight/Late Rate (Approximately 4-5 hours before dusk) 25.00 7/1/2020
7.1.2.6. Super Twilight (2-3 hours before dusk) 22.00 7/1/2020 24.00
7.1.2.7. Junior (18 years & under) (resident) 18.00 7/1/2019
7.1.2.8. Junior (18 years & under) (non-resident) 20.00 7/1/2019
7.1.2.9. First Tee Student 16.00 7/1/2020
7.1.3. Tournaments
7.1.3.1. Weekday charge per player 35.00 7/1/2019
7.1.3.2. Weekend charge per player 46.00 7/1/2021
8 Group Picnics
8.1. Resident
8.1.1. Hillcrest, Meadow Homes, Ygnacio Valley 149.00 7/1/2019
8.1.2. Baldwin, Newhall 179.00 7/1/2019
8.1.3. Concord Community Park #1 256.00 7/1/2019
8.1.4. Concord Community Park #2 358.00 7/1/2019
8.1.5. Concord Community Park #3 - New 149.00 7/1/2019
8.2. Non-Resident
8.2.1. Hillcrest, Meadow Homes, Ygnacio Valley 190.00 7/1/2019
8.2.2. Baldwin, Newhall 220.00 7/1/2019
8.2.3. Concord Community Park #1 297.00 7/1/2019
8.2.4. Concord Community Park #2 400.00 7/1/2019
8.2.5. Concord Community Park #3 - New 190.00 7/1/2019
8.3. Refundable Damage Deposit 200.00 7/1/2008
8.4 Picnic Site Rental Technology Fee - per site, per day 5% of rental fees 7/1/2020 9 Motion Picture Permit Processing
9.1. Application filing fee for permit for filming of motion pictures for commercial and non-commercial purposes (non-refundable) 500.00 7/1/2019 10 Pre School Effective 1-1-2023
10.1. Two da ys per week (monthly installment)
10.1.1. Resident 167.00 1/1/2022 175.00
10.1.2. Non-Resident 197.00 1/1/2022 207.00
10.2. Three days per week (monthly installment)
10.2.1. Resident 237.00 1/1/2022 249.00
10.2.2. Non-Resident -- 267.00 1/1/2022 280.00
10.2.3. Five days per week (monthly installment) - New
10.2.4. Resident 420.00 1/1/2020 441.00
10.2.5. Non-Resident 450.00 1/1/2022 472.00
10.3. Registration Fee (non-refundable) 125.00 1/1/2022
10.4 Technology Fee - Per School Year
10.4.1 Two da y programs 54.00 7/1/2020
10.4.2 Three day programs 90.00 1/1/2022
10.4.3 Five day programs 108.00 1/1/2022
11 Special Events
11.1. Non-refundable Application/Permit Fee 250.00 7/1/2008
11.2. Refundable Damage Deposit : 7/1/2008
11.2.1. Cate gory I Event 1,500.00 7/1/2008
11.2.2. Cate gory II Event 1,000.00 7/1/2008
11.2.3. Cate gory III Event 500.00 7/1/2008
11.3. Event Estimated Fees Deposit (percent of cost) 25% 7/1/2008
11.4. Direct City Services (percent of cost) : 7/1/2008
11.4.1. Priorit y II through Priority IV (percent of cost) 80% 7/1/2008
11.4.2. Priority V (percent of cost) 100% 7/1/2008
12 Lifelong Learning, Enrichment & Recreation Activities
12.1. Activity Fee (Varies based on instructor/staff level, activity, destination, program hours,quantity of sessions & expenses) 5.00 & up 8/1/2018
12.1.1. Non-Resident Activity Fees (additional)
5.00 or 10% of
Activity Fee,
whichever is greater. 7/1/2020
12.1.2. Withdrawal Fee 5.00 7/1/2020
(Programs with specific cancellation fees; only higher fee applies, not both)
12.2. Technology Fee (per registration) 8/1/2018
12.2.1 Activities $1 to $20 3.00 8/1/2018
12.2.2 Activities $21 to $99 4.00 8/1/2018
12.2.3 Activities $100 to 199 6.00 1/1/2020
12.2.4 Activities $200 to $299 10.00 7/1/2021
12.2.5 Activities $300 or more 12.00 7/1/2021
8
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit D. Permit Center Fees
1. Administrative Permit (does not include design review)
1.1 New Use [B] Actual Hours &
Fixed Fee Actual Hours 279.00 n/a 209.68 Varies 1,200.00 7/1/2021
1.2 Change of Use/Tenant Fixed Fee 213.00 279.00 52.42 544.42 7/1/2021 215.00
1.3 Temporary Use Fixed Fee 450.00 279.00 52.42 781.42 7/1/2021 483.00
1.4 Home Based Business [E] Fixed Fee 53.00 n/a 53.00 7/1/2019
1.4.1 Tutoring or Client Based Home Based Busines s [F] Fixed Fee 321.00 n/a n/a 321.00 7/1/2019
1.5 Minor Exceptio n Fixed Fee 639.00 279.00 209.68 1,127.68 7/1/2021 645.00
1.6 Redacted
1.7 Sidewalk Café Pre-Application Review (also requires Encroachment Permit - see section 17
) Fixed Fee 319.50 279.00 n/a 209.68 808.18 7/1/2021 322.50
1.8 Vendor Permi t Fixed Fee 450.00 279.00 n/a 729.00 7/1/2021 483.00
1.9 Seasonal Outdoor Sales Fixed Fee 426.00 104.84 530.84 7/1/2021 430.00
1.10 Seasonal Outdoor Sales - Refundable Security Deposit [A] Security De
posit 2,500.00
1.11 Administrative Permit with DAC referral (in addition to aforementioned fee
(s)) [B] Actual Hours &
Fixed Fee Actual Hours 279.00 Actual Hours 600.00 7/1/2021
2. Animal Permit 530.00 530.00 7/1/2021 538.00
3. Annexation
3.1 Planning Revie
w [B] Actual Hours Actual Hours n/a n/a 25,000.00
3.2 Engineering Review:
3.2.1 Area of 2.5 acres or less Fixed Fee n/a 3,353.00 n/a 3,353.00 7/1/2019
3.2.2 Area larger than 2.5 acres, but not larger than 25 acres Fixed Fee n/a 4,751.00 n/a 4,751.00 7/1/2019
3.2.3 Area larger than 25 acres Fixed Fee n/a 6,427.00 n/a 6,427.00 7/1/2019
3.3 Out of area sewer service application (LAFCO application processing) Fixed Fee n/a 2,795.00 n/a 2,795.00 7/1/2019
4. Appeal [E] [F]
4.1 Staff Interpretation/Administrative Decision (+ Public Notification D.33) Fixed Fee 99.00 n/a n/a 99.00 138.00
4.2 To Planning Commission (+Public Notification D.33 Fixed Fee 99.00 n/a n/a 99.00 138.00
4.3 To City Council (+Public Notification D.33) Fixed Fee 99.00 n/a n/a 99.00 138.00
5. Application Acceptability Review/Pre-Submittal Meeting Fixed Fee 319.50 279.00 209.68 808.18 7/1/2021 322.50
6. Building Move/Relocation Application [B] Actual Hours Actual Hours Actual Hours n/a 1,500.00 NOTE: Encroachment and/or Building permits may be
required.
7. Building Permit, Plan Review & Inspection
7.1 Building Division Fees See Table
3a
7.2 Additional Plan Review - Planning & Engineering
NOTE: Includes required plan review for all construction codes adopted by the City. The fee includes one round of comments plus one back check. Additional plan review required following the back check will be charged based upon the plan review hourl
y rate.
7.2.1 Initial Application Revie w Fixed Fee 213.00 157.00 209.68 579.68 7/1/2021 215.00
7.2.2 Plot Plan (Final Grading and Drainage Review (single lot, part of subdivision)) Fixed Fee 213.00 279.00 492.00 7/1/2021 215.00
7.2.3 Other Plan Review as Required [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 1,500.00
7.3 Plot Plan (Final Grading and Drainage Improvements) Inspection (single lot, part of a subdivision [B] Actual Hours n/a Actual Hours n/a 1,500.00
7.3 Building Permit Stormwater Pollution Prevention Compliance Plan Review
Please refer to Section 39 for related fees
.
7.3.1 Coordination (1/2 hour) Fixed Fee n/a 140.00 n/a 140.00 7/1/2019
7.3.2 Additional time (per hour) [B] Actual Hours n/a Actual Hours n/a 500.00
7.3.3 C.3 service fee for permits increasing impervious surface Valuation- Based See Table 3a
8. Child Care Program See Table
3a
9. Condition Compliance and Mitigation Monitoring
9.1 Minor (Admin with no Design Review Board) Actual Hours & Fixed Fee Actual Hours 476.00 104.84 Varies 3,000.00 7/1/2021
9.2 Major (with Design Review Board) [B] Actual Hours Actual Hours Actual Hours Actual Hours 15,000.00
9.3 Stormwater Facility Certification [B] Actual Hours n/a Actual Hours 1,500.00
9.4 Specialized Condition Compliance - conducted by consultant [A] Cost + 20% Admin Fee
Cost + 20%
Admin Fee
10. Design and Site Review
10.1 Design and Site Revie w
10.1.1 Staff review (including Design and Site Review
Amendments) [B] Actual Hours &
Fixed Fee Actual Hours 558.00 179.00 Actual Hours 2,500.00 7/1/2021 195.00
10.1.2 Staff and DRB review (including Design and Site Review Amendments) [B] Actual Hours &
Fixed Fee Actual Hours 558.00 179.00 Actual Hours Varies 6,500.00 7/1/2021 195.00
10.1.3 Conceputal Design Review [B] Actual Hours
Actual Hours n/a n/a n/a $1,000 7/1/2020
10.2 Design and Site Review Extensio n Fixed Fee 639.00 639.00 7/1/2021 645.00
10.3 Mural Review (Fee waiver available for non-
profits/schools/student artists) Fixed Fee 200.00 200.00 7/1/2021 Proposed Changes Effective 7/1/22 Current Fees
9
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
16.10.1 Plan Review (if required) [B] Actual Hours Actual Hours Actual Hours n/a Minimum 1-Hr 7/1/2020
16.10.2 Inspections Fixed Fee 528.00 528.00 7/1/2021
16.10.3 Restoration Security Deposit = 100% cost to restore public right-of-way or watercourse to pre-encroachment condition.
Security
Deposit
100% of Restoration
Cost
Applicant must complete work and request refund of
deposit within 30 days from final inspection or 60 days from issuance (whichever is later) or deposit is
forfeited.
16.11 Other Inspection Charge
s
16.11.1 Reinspection, for reasons such as failure to schedule an inspection, work not ready for a requested inspection, and failed or improper work done without an inspection which must be redone (one hour minimum)
[B] Actual Hours n/a Actual Hours n/a
176.00
7/1/2019
16.11.2 Special inspection requests, other than regular business hours
(2 hour minimum charge) [B] Actual Hours n/a Actual Hours n/a 352.00 7/1/2021
16.11.3 Specialty inspection
16.11.3.1 Materials sampling, compaction testing and special materials testin
g [A] Cost + 20%
Admin Fee
Cost + 20%
Admin Fee
16.11.3.2 Sewer air Test and Televising (per call out) [A] Cost + 20% Admin Fee
Cost + 20%
Admin Fee
17. Environmental Review
17.1.1 Initial Study (staff prepared) [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 10,000.00 7/1/2019
17.1.2 Negative Declaration (staff prepared) [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 2,500.00 7/1/2019
17.1.3 Mitigated Negative Declaration (staff prepared) [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 5,000.00 7/1/2019
17.2 Consultant prepared environmental analysis [A] Cost + 20% Admin Fee
Cost + 20%
Admin Fee
17.3 Peer review by consultant [A] Cost + 20%
Admin Fee
Cost + 20%
Admin Fee
17.4 Staff review of consultant-prepared analysis/revie w 7/1/2018
17.4.1 Initial Study [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 5,000.00 7/1/2019
17.4.2 Negative Declaration [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 1,250.00 7/1/2019
17.4.3 Mitigated Negative Declaration [B] Actual Hours Actual Hours Actual Hours Actual Hours 5,000.00 7/1/2021
17.4.5 Environmental Impact Report [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 10,000.00 7/1/2019
17.5 Agency Filing Fees Actual Cost various n/a n/a Actual Cost
17.6 Document Processin g Fixed Fee 319.50 n/a n/a 319.50 7/1/2021 322.50
18. Flood Zone/FEMA/Drainage
NOTE: Includes one review and one revision
18.1 Flood Zone Verification Certificat e Fixed Fee n/a 157.00 n/a 157.00 7/1/2021
18.2 Flood Zone Verification Certificate (requiring additional analysis due to location of structure relative to flood
plain) Fixed Fee n/a 872.00 n/a 872.00 7/1/2021
18.3 Flood Elevation Certificat e Fixed Fee n/a 1,428.00 n/a 1,428.00 7/1/2019
18.4 Flood Zone Construction Permi t Fixed Fee n/a 715.00 n/a 715.00 7/1/2019
18.5 FEMA application review for LOMA's, CLOMA's, LOMR's, CLOMR's, et
c Fixed Fee n/a 2,297.00 n/a 2,297.00 7/1/2019
18.6 Drainage investigations (per hour ) [B] Actual Hours n/a Actual Hours n/a 1,500.00
19. General/Specific Plans
19.1 Plan Amendment [B] Actual Hours Actual Hours Actual Hours n/a 20,000.00
19.2 General Plan/Zoning Ordinance Reimbursement Fee (.0031 x Buildin
g Permit Valuation)
Valuation-
based 0.31% 0.31%
20. Grading and Erosion Control Permit
Note: No permit required for grading in an area < 50 cubic yards and not hillside For more detail and additional
exem
ptions see CMC 16.10.030 (b) and (c).
20.1 Grading Permit Processing, Administration & Other Fee s
20.1.1 Application Processing Fixed Fee n/a 157.00 n/a 157.00 7/1/2021
20.1.2 Filing fee exclusive of processing and inspection fees Fixed Fee n/a 78.00 n/a 78.00 7/1/2019
20.1.3 Pad certification Fixed Fee n/a 279.00 n/a 279.00 7/1/2019
20.1.4 Stockpile and erosion control monitoring (per calendar day) Per Day n/a 45.00 n/a 45.00 7/1/2019
20.1.5 Wet Season Work Authorization Per week n/a 90.00 n/a 90.00 7/1/2019 (October 15 - April 15) - Per Week
Note: Must obtain approval from inspector prior to commencing grading work during wet weather.
20.1.6 Refundable Security Deposit for Grading Permits
20.1.6.1 Erosion Control Deposit - 100% cost of grading, removal of associated nuisances/hazards, may
include installation of erosion & sediment control
measures.
Security
Deposit 100% of Project Cost
10
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
20.1.6.2 See Recycling Program fees and Performance
Security Deposit for information on additional
construction & demolition security deposit
requirements (Section 35).
See Section
35 20.2 Standard Grading Plan Review Fees
:
Note: All plan review fees include one initial submission and one revision. Any additional plan review required will be charged at an hourly rate, and will require an adequate deposit to a trust account
prior to commencement.
20.2.1 Single lot in (a non-hillside) location up to 100 cubic yards [B] Actual Hours & Fixed Fee Actual Hours 419.00 n/a 419.00 Minimum 1-Hr 7/1/2020
20.2.2 Single lot in (a hillside) location up to 100 cubic yards [B] Actual Hours & Fixed Fee Actual Hours 558.00 n/a 558.00 Minimum 1-Hr 7/1/2021
20.2.3 101-1,000 cubic yards, for the first 100 cubic yards Fixed Fee (Increment) n/a 558.00 n/a Varies 7/1/2021
20.2.4 Plus for each additional 100 cubic yards or fraction thereof Fixed Fee (Increment) n/a 140.00 n/a Varies 7/1/2019
20.2.5 1,001-10,000 cubic yards, for the first 1,000 cubic yards Fixed Fee (Increment) n/a 1,816.00 n/a Varies 7/1/2019
20.2.6 Plus for each additional 1,000 cubic yards or fraction thereo
f
Fixed Fee
(Increment) n/a 279.00 n/a Varies 7/1/2019
20.2.7 10,001-100,000 cubic yards, for the first 10,000 cubic yards
Fixed Fee
(Increment) n/a 4,332.00 n/a Varies 7/1/2019
20.2.8 Plus for each additional 1,000 cubic yards or fraction thereo
f
Fixed Fee
(Increment) n/a 111.00 n/a Varies 7/1/2019
20.2.9 Over 100,000 cubic yards, for first 100,000 cubic yards Fixed Fee (Increment) n/a 14,392.00 n/a Varies 7/1/2019
20.2.10 Plus each additional 10,000 cu yds Fixed Fee
(Increment) n/a 83.00 n/a Varies 7/1/2019
20.2.11 Additional plan review beyond one revision (see note [B] Actual Hours n/a Actual Hours n/a 1,500.00
20.3 Special Grading Plan Review Fees :
20.3.1 New Pool - Plan Review Fixed Fee 558.00 558.00 7/1/2021
20.4 Additional document review, including SWPPP's and Soils re
port
20.4.1 Geotechnical [B] Actual Hours n/a Actual Hours n/a 1,500.00
20.4.2 SWPPP [B] Actual Hours n/a Actual Hours n/a 1,500.00
20.4.3 Mylar Maps and Plans Security Deposit: $200/page OR Minimum: $500
(Plans)
Security
De
posit
$200/page, $500
minimum
20.5 Grading Permit Inspectio n
Note: The permit fee includes inspections made during the specified timeline only.
Up to 1,000 cubic yards: 30 days from date of permit
Over 1,000 up to 10,000 cubic yards: 60 days from date of permit
Over 10,000 up to 100,000 cubic yards: 90 days from date of permit
Over 100,000 cubic yards: 120 days from date of permit
20.5.1 Single lot in (a non-hillside) location up to 100 cubic yards Fixed Fee n/a 528.00 n/a 528.00 7/1/2021
20.5.2 Single lot in (a hillside) location up to 100 cubic yards Fixed Fee n/a 704.00 n/a 704.00 7/1/2021
20.5.3 101-1,000 cubic yards, for the first 100 cubic yards Fixed Fee (Increment) n/a 704.00 n/a Varies 7/1/2021
20.5.4 Plus for each additional 100 cubic yards or fraction thereof Fixed Fee (Increment) n/a 176.00 n/a Varies 7/1/2019
20.5.5 1,001-10,000 cubic yards, for the first 1,000 cubic yards Fixed Fee (Increment) n/a 2,288.00 n/a Varies 7/1/2021
20.5.6 Plus for each additional 1,000 cubic yards or fraction thereo
f
Fixed Fee
(Increment) n/a 352.00 n/a Varies 7/1/2021
20.5.7 10,001-100,000 cubic yards, for the first 10,000 cubic yards
Fixed Fee
(Increment) n/a 5,456.00 n/a Varies 7/1/2021
20.5.8 Plus for each additional 1,000 cubic yards or fraction thereo
f
Fixed Fee
(Increment) n/a 141.00 n/a Varies 7/1/2021
20.5.9 Over 100,000 cubic yards , for the first 100,000 cubic yards Fixed Fee (Increment) n/a 18,128.00 n/a Varies 7/1/2021
20.5.10 Plus for each additional 1,000 cubic yards or fraction thereo
f
Fixed Fee
(Increment) n/a 106.00 n/a Varies 7/1/2021
20.6 Special Grading Permit Inspection Fees
20.6.1 New Pool - Inspectio n Fixed Fee 528.00 528.00 7/1/2021
20.6.2 Pool Demolition - Inspection Fixed Fee 528.00 528.00 7/1/2021
21. Hillside Protection
21.1 Minor - SFR - 1 lot [B] Actual Hours Actual Hours Actual Hours 3,500.00 7/1/2021
21.2 Major - Res - > 1 lot; Non-Res [B] Actual Hours Actual Hours n/a n/a Actual Hours 7,500.00 7/1/2019
21.3 Hillside Protection Extensio n Fixed Fee 852.00 n/a n/a 805.00 7/1/2021 860.00
21.4 Administrative Hillside Development Use Permit Actual Hours Actual Hours 1,500.00 7/1/2021
22. Historic Preservation
22.1 Certificate of Appropriateness - Minor Alterations [B] Actual Hours Actual Hours n/a n/a 1,500.00 7/1/2021
22.2 Amendment to Certification of Appropriateness Fixed Fee 852.00 852.00 7/1/2021 860.00
22.3 Designation/Termination of Landmark Designatio n [B] Actual Hours Actual Hours n/a n/a 3,000.00 11
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
22.4 Certificate of Appropriateness - Major Alterations Actual Hours Actual Hours 3,500.00 7/1/2021
23. Improvements (Major)
23.1 Permit Processing, Administration & Other Fee s
23.1.1 Pre-Engineering (For initial meeting) [B] Actual Hours & Fixed Fee 558.00 Actual Hours Varies 1,000.00 7/1/2021
23.1.2 Pre-Engineering Traffic Review [B] Actual Hours & Fixed Fee 558.00 Actual Hours Varies 1,000.00 7/1/2021
23.1.3 Application Processing Fixed Fee n/a 157.00 157.00 7/1/2020
23.1.4 Filing fee exclusive of processing and inspection fees Fixed Fee n/a 78.00 78.00 7/1/2019
23.2 Improvement Plan Revie w
Note: Includes initial submission and two revisions
23.2.1 Base Cost (Improvements cost ≤ $100,000, plus cost per $5K increment) Fixed Fee Actual Hours 279.00 n/a Actual Hours 279.00 7/1/2021
23.2.2 per each addtl $5,000 increment, or fraction thereof Fixed Fee (Increment) Actual Hours 279.00 n/a Varies 7/1/2021
23.2.3 Base Cost (improvement cost $100,001 - $500,000, plus cost
per $10K increment)
Fixed Fee
(Increment) Actual Hours 5,859.00 n/a Varies 7/1/2021
23.2.4 per each addtl $10,000 increment more than $100,000, or fraction thereo
f
Fixed Fee
(Increment) Actual Hours 209.00 n/a Varies 7/1/2021
23.2.5 Base Cost (Improvement cost > $500,001, plus cost per $5K increment
)
Fixed Fee
(Increment) Actual Hours 14,229.00 n/a Varies 7/1/2021
23.2.6 per each addtl $20,000 increment more than $500,000, or fraction thereo
f
Fixed Fee
(Increment) Actual Hours 140.00 n/a Varies 7/1/2021
23.2.7 Plan Re-Chec k [B] Actual Hours n/a Actual Hours n/a 1,500.00
23.3 Improvement Inspectio n
*Note: The permit fee includes inspections made during the s
pecified timeline only.
23.3.1 Base Cost - Improvements ≤ $100,000, plus cost per $5K increment or less Fixed Fee n/a 528.00 n/a 528.00 7/1/2021 (30 days to complete - see note*)
23.3.2 per each addtl $5,000 increment, or fraction thereof Fixed Fee (Increment) n/a 352.00 n/a 352.00 7/1/2021
23.3.3 Base Cost - improvement cost $100,001 - $500,000, plus cost
per $5K increment Fixed Fee n/a 7,392.00 n/a 7,392.00 7/1/2021 (90 days to complete - see note* )
23.3.4 per each addtl $5,000 increment more than $100,000, or fraction thereo
f
Fixed Fee
(Increment) n/a 264.00 n/a 264.00 7/1/2021
23.3.5 Base Cost - Improvement cost > $500,001, plus cost of $5K increment Fixed Fee n/a 28,512.00 n/a 28,512.00 7/1/2021 (180 days to complet
e - see note*)
23.3.6 per each addtl $5,000 increment more than $500,000, or fraction thereo
f
Fixed Fee
(Increment) n/a 176.00 n/a 176.00 7/1/2019
23.3.7 C.3 service fee for permits increasing impervious surface (percent of valuation)
Valuation-
Based See Table 3a
23.4 Security Deposits and Bond Requirement
s
Note: Additional requirements may be identified in the
Conditions of Approval for each project
23.4.1 Mylar Maps and Plans Security Deposit: $200/page, minimum of $500 (to guarantee submission/return of final ma
ps/plans to City)
Security
Deposit
$200/page, $500
minimum
23.4.2 Improvement Security Deposit/Bond (if required): 110% of construction costs + 100% contractor/subcontractors/labor & material cost
s
Bond or
Security
De
posit
110% of Construction
Costs
23.4.3 Performance Bond (if required)
110% of construction costs or as determined by City
Engineer
Bond or
Security
De
posit
110% of Construction
Costs
23.4.4 See Recycling Program fees and Performance Security Deposit for information on additional Construction &
Demolition security deposit requirements
Security
Deposit
See Recycling Program
Fees
23.4.5 Fee associated with calling a bond (if required); to be funded from bond proceeds Actual Cost
Actual Hours
plus any
Outside Costs
Actual Cost
24. Inclusionary Housing See Table
3a
25. Map Reviews
25.1 Tentative Map
s
25.1.1 Tentative Parcel Map Review (also known as a Tentative Minor Subdivision Map)
Fixed Fee &
Actual Hours
(Planning &
Transportation)
Actual hours
2,795.00
n/a
Actual Hours
Varies
7,500.00
7/1/2019
25.1.2 Plus per lot Fixed Fee
(Increment) n/a 279.00 n/a Varies 7/1/2019
25.1.3 Amendment to Minor Subdivision Fixed Fee 2,556.00 837.00 n/a 3,393.00 7/1/2021 2,580.00
25.1.4 Extension to Minor Subdivisio n Fixed Fee 852.00 558.00 n/a 1,410.00 7/1/2021 860.00 12
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
25.1.5 Tentative Major Subdivision Map Review (Also known as a Tract Map)
Fixed Fee &
Actual Hours
(Planning &
Transportation)
Actual Hours
4,464.00
n/a
Actual Hours Varies 15,000.00
7/1/2021
25.1.6 Plus Per Lot Fixed Fee
(Increment) n/a 279.00 n/a 7/1/2019
25.1.7 Amendment to Major Subdivision Fixed Fee 2,556.00 1,674.00 n/a Actual Hours 4,230.00 7/1/2021 2,580.00
25.1.8 Extension to Major Subdivision Fixed Fee 958.50 558.00 n/a 1,516.50 7/1/2021 967.50
25.2 Parcel Maps (Minor Subdivision Maps) - recorded map process
25.2.1 Parcel Map processing fees Fixed Fee n/a 236.00 n/a 236.00 7/1/2021
25.2.2 Parcel Map review Fixed Fee 213.00 4,185.00 n/a 4,398.00 7/1/2021 215.00
25.2.3 Plus Per Lot Fixed Fee
(Increment) n/a 279.00 n/a 279.00 7/1/2021
25.2.4 Parcel Map Filin g Fixed Fee n/a 2,790.00 n/a 2,790.00 7/1/2021
25.2.5 Mylar Maps and Plans Security Deposit:
$200/page OR Minimum: $500 (Parcel Map) and $1,000
(Final Map)
[A] Security
Deposit
$200/page, $500
minimum
25.3 Final Maps (Major Subdivision or Tract Maps )
25.3.1 Final Map processing fees Fixed Fee n/a 236.00 n/a 236.00 7/1/2021
25.3.2 Final Map Review [B] Actual Hours &
Fixed Fee Actual Hours 5,580.00 n/a 5,580.00 Minimum 1-Hr 7/1/2021
25.3.3 Plus Per Lot Fixed Fee
(Increment) n/a 279.00 n/a 279.00 7/1/2021
25.3.4 Map Re-revie w Fixed Fee n/a 1,256.00 n/a 1,256.00 7/1/2021
25.3.5 Final Map Filing Fixed Fee n/a 2,790.00 n/a 2,790.00 x 7/1/2021
25.3.6 Mylar Maps and Plans Security Deposit:
$200/page OR Minimum: $500 (Parcel Map) and $1,000
(Final Map)
[A] Security
Deposit
$200/page, $500
minimum
25.4 Agreements
25.4.1 Subdivision Agreement Fixed Fee n/a 8,694.00 n/a 8,694.00 7/1/2019
25.4.2 Amendment to Subdivision Agreement Fixed Fee n/a 5,899.00 n/a 5,899.00 7/1/2019
25.4.3 Improvement Agreement Fixed Fee n/a 8,694.00 n/a 8,694.00 7/1/2019
25.4.4 Amendment of Improvement Agreement (Minor
Subdivisions
) Fixed Fee n/a 5,899.00 n/a 5,899.00 7/1/2019
25.5 Other Map Change s
25.5.1 Special engineering analysis performed by outside consultan
t [A] Cost + 20%
Admin Fee
Cost + 20%
Admin Fee
25.5.2 Charge for Filing of New Street Monuments (each ) Fixed Fee n/a 314.00 n/a 314.00 7/1/2021
25.5.3 Charge for new lot creation (per lot) Fixed Fee n/a 558.00 n/a 558.00 7/1/2021
25.5.4 Lot line adjustment (between 2 parcels) Fixed Fee 427.00 1,395.00 89.50 1,911.50 7/1/2021 430.00 97.50
25.5.5 Each additional parcel Fixed Fee n/a 279.00 n/a 279.00 7/1/2019
25.5.6 Parcel merge (between 2 parcels) Fixed Fee 427.00 1,395.00 n/a 1,822.00 7/1/2021 430.00
25.5.7 Each additional parcel Fixed Fee n/a 279.00 n/a 279.00 7/1/2019
25.5.8 Certificate of Compliance Fixed Fee n/a 1,395.00 n/a 1,395.00 7/1/2021
25.5.9 Certification of Correction Review Fixed Fee n/a 1,395.00 n/a 1,395.00 7/1/2021
25.5.10 Update of City Sanitary Sewer and Storm Drain Base Ma
ps
25.5.10.1 Minor Subdivisio n Fixed Fee n/a 558.00 n/a 558.00 7/1/2021
25.5.10.2 Major Subdivision Fixed Fee n/a 1,116.00 n/a 1,116.00 7/1/2021
25.6 Easement, Dedication, Vacation, Abandonmen t
25.6.1 Application for vacation or abandonment of property rights Fixed Fee 2,130.00 1,674.00 n/a 3,804.00 7/1/2021 2,150.00
25.6.2 Acceptance of easements and dedications
25.6.2.1 Acceptance by City Counci Fixed Fee n/a 2,790.00 n/a 2,790.00 7/1/2021
25.6.2.2 Acceptance by City Staff Fixed Fee n/a 1,395.00 n/a 1,395.00 7/1/2021
25.6.3 Reversion to acreage or record of survey filing fee Fixed Fee 213.00 837.00 n/a 1,050.00 7/1/2021 215.00
25.6.4 Assessment District Reapportionment (CMC 78-32)
25.6.4.1 Application Fee Fixed Fee n/a 279.00 n/a 279.00 7/1/2019
25.6.4.2 Review - Hearing Method Fixed Fee n/a 16,740.00 n/a 16,740.00 7/1/2021
25.6.4.3 Review - Alternative Method Fixed Fee n/a 837.00 n/a 837.00 7/1/2021
25.7 Development Plan Review and additional plan checking as re
quired, due to substantial plan alterations [B] Actual Hours n/a Actual Hours n/a 1,500.00
26. Neighborhood Preservation
26.1 Multi-Family Rental Inspection Program Fees See Table 3b
27. Off-Site Street Improvement Program (OSIP)
27.1 Single family unit (per dwelling uni t Per Unit n/a 3,251.00 n/a Varies
27.1.1 Accessory Dwelling Unit (750sqft to 1200sqft and larger than 40% of
primary dwelling) Per Unit n/a 1,626.00 n/a Varies
27.1.2 Accessory Dwelling Unit (750sqft to 1200sqft and 40% or smaller than
primary dwelling) Per Unit n/a 1,073.00 n/a Varies 7/1/2020
27.2 Multi family unit, including condominium and townhouse (per dwellin
g unit) Per Unit n/a 2,624.00 n/a Varies
27.3 Commercial (per gross sq. ft. ) Per G.S.F. n/a 8.81 n/a Varies
27.4 Office (per gross sq. ft. ) Per G.S.F. n/a 7.04 n/a Varies
27.5 Industrial (per gross sq. ft. ) Per G.S.F. n/a 2.98 n/a Varies
27.6 Mini-storage (per gross sq. ft. ) Per G.S.F. n/a 1.51 n/a Varies
28. Other Community Development Fees [C]
28.1 Abatement Hearing (by the Zoning Administrator Fixed Fee 1,704.00 n/a n/a 1,704.00 7/1/2021 1,720.00 13
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
28.2 New Street Name/Street Name Chang e
28.2.1 Planning Fixed Fee 2,484.00 279.00 n/a 2,763.00 7/1/2021 2,580.00 (includes 8 hrs for IT and coord with PD,Fire)
28.3 Continuance of Hearing Ite m
28.3.1 Continuance by Applicant Fixed Fee 1,704.00 n/a n/a 1,704.00 7/1/2021 1,720.00
28.3.2 Republication and renotification Actual Cost Actual Cost n/a n/a Actual Cost
29. Oversized Load Permit
29.1 A single day vehicle movement Fixed Fee n/a 16.00 n/a 16.00 State Mandated
29.2 Multiple movements of a vehicle for a one-year period (special conditions may apply) Fixed Fee n/a 90.00 n/a 90.00 State Mandated
30. Park Land
30.1 Rural Residential-Conservation/Low-Density Residential Desi
gnations;
Park Land Requirement - 697 sq.ft. (per unit
30.1.1 38961 Per Uni t n/a 11,910.00 n/a
30.1.2 39326 Per Uni t n/a 13,504.00 n/a
30.1.3 39692 Per Uni t n/a 15,098.00 n/a
30.1.4 40057 Per Uni t n/a 16,691.00 n/a
30.2 Medium-Density Designation; Park Land Requirement - 479 sq. ft.
30.2.1 38961 Per Uni
t n/a 8,170.00 n/a
30.2.2 39326 Per Uni t n/a 9,271.00 n/a
30.2.3 39692 Per Uni t n/a 10,370.00 n/a
30.2.4 40057 Per Uni t n/a 11,470.00 n/a
30.3 High-Density Designation; Park Land Requirement - 414 sq. ft. (per unit)
30.3.1 38961 Per Unit n/a 7,055.00 n/a
30.3.2 39326 Per Uni t n/a 8,009.00 n/a
30.3.3 39692 Per Uni t n/a 8,962.00 n/a
30.3.4 40057 Per Uni t n/a 9,914.00 n/a
30.4 Downtown, Seniors and Special Needs Housing Units; Park Land
Requirement - 305 sq. ft. (per unit
)
30.4.1 38961 Per Unit n/a 5,233.00 n/a
30.4.2 39326 Per Uni t n/a 5,924.00 n/a
30.4.3 39692 Per Uni t n/a 6,613.00 n/a
30.4.4 40057 Per Uni t n/a 7,304.00 n/a
30.5 Accessory Dwelling Unit (750sqft to 1200sqft and larger than 40% of primary dwelling)
- shall be fifty percent 7/1/2020
(50%) of the Rural Residential-Conservation/Low Density Residential Desi
gnation
(per unit)
30.5.1 38961 Per Unit n/a 5,955.00 n/a
30.5.2 39326 Per Uni t n/a 6,752.00 n/a
30.5.3 39692 Per Uni t n/a 7,548.00 n/a
30.5.4 40057 Per Uni t n/a 8,345.00 n/a
30.6 Accessory Dwelling Unit (750sqft to 1200sqft and 40% or smaller than
primary dwelling) n/a 5,508.00 n/a 7/1/2020
Per Unit
31. Parking, In-Lieu Payment
31.1 Per off-street parking space that a development is deficient; land use conversion of an existing building that requires additional parking and new commerical (or other non-residential
) development
Per Space 1,572.00 n/a n/a
31.2 Per off-street parking space that a development is deficient; new multifamily residential development.
**Projects submitted as of April 25, 2017, and building permits pulled by July 1, 2020, parking in-lieu fee at $1,572.
Per Space 25,000 7/1/2018
32. Preliminary Applications 7/1/2021
32.1 Nonresidential Project, and Non-SB 330 Residential Project Fixed Fee 1,704.00 1,960.00 419.36 4,083.36 7/1/2021 1,720.00
32.2 SB 330/Residential Project [B]
Actual Hours Actual Hours Actual Hours Actual Hours Varies 5,000.00 7/1/2021
32.3 SB 9 Eligibility Determination
Actual
Hours and
Fixed Fee Actual Hours
Actual
Hours 97.50 Varies 3,000.00
33. Public Notification
33.1 Minor (100-foot radius or posting site
) Fixed Fee 426.00 n/a n/a n/a 426.00 7/1/2021 430.00
33.2 Major (300-500 foot radius ) Fixed Fee 1,454.00 n/a n/a 1,454.00 7/1/2021 1,467.00
34. Public Support
34.1 Research, per hour after first 30 minutes [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 500.00 7/1/2019
34.2 Consultation, per hour after first 30 minutes [B] Actual Hours Actual Hours Actual Hours n/a Actual Hours 500.00 7/1/2019
35. Recycling - Construction & Demolition Projects
35.1 Program Fee (CMC 82-120) - Percentage assessed to the permit value of covered projects (CMC 18-116). This fee is capped at $4,500 and $18,000 for residential and commercial projects, respectively. This fee is non-refundable.
Valuation
Percentage 0.30% 0.30%
14
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
35.2 Request for Exemption for Small Collection Facilities for Nonprofit Organizations (CMC 82-113). Fixed Fee 250.00 250.00
35.3 Performance Security Fee (CMC 82-118) - Percentage assessed to the permit value of covered projects (CMC 18- 116). The minimum fee is $250 for projects under $10,000 in value and $500 for projects $10,000 in value, or greater. The maximum fee is ca
pped at $25,000.
[A] Security
Deposit
35.3.1 Permit Value - $0 - $49,99
9 1.5% 1.5%
35.3.2 Permit Value - $50,000 or mor e 2.0% 2.0%
36. Sewer Connection
(If new construction is necessary, a building or
encroachment
permit will also be required.
36.1 Application Processing Fee n/a 157.00 n/a 157.00 7/1/2020
36.2 Connection Fe e
36.2.1 Single Family Home or 3-Bedroom Multiple Dwelling Unit n/a 5,043.00 n/a
36.2.2 2-Bedroom Multiple Dwelling Unit n/a 3,731.00 n/a
36.2.3 1-Bedroom or Studio Multiple Dwelling Unit n/a 2,774.00 n/a
36.2.4 Accessory Dwelling Unit (750sqft to 1200sqft and larger than 40% of primary dwelling) n/a 2,522.00 n/a 7/1/2020
36.2.5 Accessory Dwelling Unit (750sqft to 1200sqft and 40% or smaller than primary dwelling and all ADUs smaller than 750 s
qft)
1,664.00 7/1/2020
36.2.6 All other uses n/a 1,009.00 n/a
36.2.7 Any connection where the main sewer was installed by the n/a Determined Individually n/a
36.2.8 Certificate of Entitlement to Reimbursement procedure n/a 175.00 n/a
36.2.9 Lateral Construction Area n/a Determined
Individually n/a
36.3 Main Trunk Reimbursement Fee s
36.3.1 Single Family Home or 3-Bedroom Multiple Dwelling Unit n/a Determined Individually n/a
36.3.2 2-Bedroom Multiple Dwelling Unit n/a Determined Individually n/a
36.3.3 1-Bedroom or Studio Multiple Dwelling Unit n/a Determined Individually n/a
36.3.4 Accessory Dwelling Unit n/a Determined
Individually n/a
36.3.5 All other uses n/a Determined
Individually n/a
36.4 Certificate of Entitlement Reimbursement Fee (CMC Article II, Section 110-40
) n/a 175.00 n/a
36.5 Sewer Service charge (annual ) n/a Table 4 n/a
37. Sidewalk Repair Administrative Fee Fixed Fee n/a 176.00 n/a 176.00 7/1/2019 (Sections 5600 et seq. of the CA Streets & Highways
Code)
37.1 Signage
37.1.1 Temporary Banne
r Fixed Fee 106.50 n/a n/a 106.50 7/1/2021 107.50
37.1.2 Master Sign Program (DRB & PC review) [B] Actual Hours & Fixed Fee Actual Hours n/a n/a 5,000.00 7/1/2021
37.1.3 Master Sign Program (staff review
) Fixed Fee 1,065.00 n/a n/a 1,065.00 7/1/2021 1,075.00
37.1.4 Sign Plan Fixed Fee 639.00 n/a 639.00 7/1/2021 645.00
37.1.5 Sign Plan Extension (PC review ) Fixed Fee 426.00 n/a n/a 426.00 7/1/2021 430.00
37.1.6 Sign Plan Extension (staff review ) Fixed Fee 213.00 n/a n/a 213.00 7/1/2021 215.00
38. Special Administration
38.1 Agreement processing not related to subdivisions
38.1.1 Council action not required Per Agreement n/a 2,232.00 n/a 2,232.00 7/1/2021
38.1.2 Council action required Per Agreement n/a 4,468.00 n/a 4,468.00 7/1/2021
38.2 Acceptance of new public improvements Fixed Fee n/a 2,232.00 n/a 2,232.00 7/1/2021
38.2.1 Address request/change Fixed Fee 51.50 n/a 51.50 7/1/2021 56.50 56.50
38.3 After-hours permit request review/approva Fixed Fee n/a 78.00 n/a 78.00 7/1/2021
38.3.1 After-hours Building Permit request review/approva Fixed Fee 51.50 n/a 51.50 7/1/2021 56.50 56.50
38.4 Permit extension reques t Fixed Fee n/a 157.00 n/a 157.00 7/1/2021
38.5 Project archiving and closeout (major projects only [B] Actual Hours n/a Actual Hours n/a 1,500.00
38.6 Penalties
38.6.1 Penalty for commencing work without permit (note: repeat offenders will be subject to increasing penalties at the discretion of the Cit
y Engineer)
Permit Fees
Doubled n/a 2X Permit
Fee n/a 2X Permit
Fee
38.6.2 Penalty for work done without scheduling the required inspection (note: repeat offenders will be subject to
increasing penalties at the discretion of the City Engineer) 1 additional
hour charged
per incident
n/a
176.00
n/a
176.00
7/1/2019
38.7.1 City Processing Fe
e Fixed Fee 370.00 370.00 7/1/2021 395.00 395.00
38.7.2 County Recording Fee Actual Cost Actual Cost Actual Cost 7/1/2021
39. Storm Water Treatment Controls
39.1 Permit Processing, Administration & Other Fee s
39.1.1 Pre-Engineering (For initial meeting) Fixed Fee n/a 558.00 n/a 558.00 7/1/2021
39.1.2 Application processing Fixed Fee n/a 157.00 n/a 157.00 7/1/2020 15
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
39.1.3 Filing fee exclusive of processing and inspection fees Fixed Fee n/a 78.00 n/a 78.00 7/1/2019
39.2 Storm Water Treatment Controls Plan Review *
Note: Includes initial submission and two revisions
39.2.1 Base Cost (Improvements cost ≤ $100,000, plus cost per $5K increment) Fixed Fee n/a 279.00 n/a 279.00 7/1/2019
39.2.2 per each addtl $5,000 increment, or fraction thereof Fixed Fee (Increment) n/a 279.00 n/a 7/1/2019
39.2.3 Base Cost (improvement cost $100,001 - $500,000, plus cost per $5K increment) Fixed Fee n/a 5,859.00 n/a 5,859.00 7/1/2021
39.2.4 per each addtl $5,000 increment more than $100,000, or fraction thereo
f
Fixed Fee
(Increment) n/a 209.00 n/a 7/1/2019
39.2.5 Base Cost (Improvement cost > $500,001, plus cost per $5K increment
) Fixed Fee n/a 22,579.00 n/a 22,579.00 7/1/2021
39.2.6 per each addtl $5,000 increment more than $500,000, or fraction thereo
f
Fixed Fee
(Increment) n/a 140.00 n/a 7/1/2019
39.2.7 Plan Re-Check (hourly ) [B] Actual Hours n/a 279.00 n/a 279.00 1,500.00 7/1/2019
39.3 Storm Water Treatment Controls 7/1/2019
39.3.1 Base Improvement cost ≤ $100,000, plus cost of $5K increment Fixed Fee n/a 355.00 n/a 355.00 7/1/2019
39.3.2 per each addtl $5,000 increment, or fraction thereof Fixed Fee (Increment) n/a 355.00 n/a 355.00 7/1/2019
39.3.3 Base Improvement cost $100,001 - $500,000, plus cost of $5K incremen
t Fixed Fee n/a 7,450.00 n/a 7,450.00 7/1/2019
39.3.4 per each addtl $5,000 increment more than $100,000, or fraction thereo
f
Fixed Fee
(Increment) n/a 266.00 n/a 266.00 7/1/2019
39.3.5 Improvement cost > $500,001, plus cost of $5K increment Fixed Fee n/a 28,736.00 n/a 28,736.00 7/1/2019
39.3.6 per each addtl $5,000 increment more than $500,000, or fraction thereo
f
Fixed Fee
(Increment) n/a 176.00 n/a 176.00 7/1/2019
39.3.7 Review of Operations & Maintenance Agreemen t Fixed Fee n/a 1,774.00 n/a 1,774.00 7/1/2019
39.3.8 Annual Inspection of Stormwater Treatment Contro Fixed Fee n/a 355.00 n/a 355.00 7/1/2019
40. TERPS (Terminal Instrument Procedures Study) [A] Cost + 20% Admin Fee
Cost + 20%
Admin Fee
41. Tree Preservation & Protection
41.1 Heritage Tree Designatio n Fixed Fee 1,706.00 n/a n/a 1,706.00 7/1/2021 1,722.00
41.2 Tree Removal [B] Actual Hours Actual Hours n/a n/a 1,500.00 7/1/2018
42. Use Permit
42.1 Minor Use Permi t
42.1.1 Existing building without hearing Fixed Fee 1,278.00 558.00 89.50 104.84 2,030.34 7/1/2021 1,290.00 97.50 2,038.34
42.1.2 Existing building with hearing Fixed Fee 1,706.00 837.00 89.50 314.52 2,947.02 7/1/2021 1,722.00 97.50 2,955.02
42.1.3 New Construction without hearing Fixed Fee 2,558.00 1,116.00 179.00 209.68 4,062.68 7/1/2021 2,580.00 195.00 4,078.68
42.1.4 New Construction with hearing Fixed Fee 4,263.00 1,953.00 179.00 419.36 6,814.36 7/1/2021 4,300.00 195.00 6,830.36
42.3 Home Based Business - Visiting Clientel e Fixed Fee 853.00 853.00 7/1/2021 860.00
42.5 Minor Use Permit Amendmen t
42.5.1 With hearing Fixed Fee 1,704.00 279.00 89.50 209.68 2,282.18 7/1/2021 1,722.00 97.50 2,290.18
42.5.2 Without hearing Fixed Fee 852.00 279.00 89.50 104.84 1,325.34 7/1/2021 860.00 97.50 1,333.34
42.6 Minor Use Permit Extensio n
42.6.1 With hearing Fixed Fee 853.00 n/a n/a 853.00 7/1/2021 860.00
42.6.2 Without hearing Fixed Fee 427.00 n/a n/a 427.00 7/1/2021 430.00
42.7 Major Use Permit
42.7.1 Existing Building [B] Actual Hours /
Fixed Fee Actual Hours Actual Hours Actual Hours 179.00 varies
3,000.00 7/1/2021
42.7.2 New Construction [B] Actual Hours /
Fixed Fee Actual Hours Actual Hours Actual Hours 179.00 varies
10,000.00 7/1/2021
42.7.3 Major Use Permit Amendment [B] Actual Hours /
Fixed Fee Actual Hours Actual Hours Actual Hours 179.00 varies
3,000.00
7/1/2021
42.7.4 Major Use Permit Extensio
n Fixed Fee 852.00 n/a n/a n/a 852.00 7/1/2021 860.00
42.8 Variance
42.8.1 Variance without hearin g Fixed Fee 1,706.00 558.00 89.50 209.68 2,563.18 7/1/2021 1,722.00 97.50 2,571.18
42.8.2 Variance with hearing [B] Actual Hours /
Fixed Fee
Actual Hours Actual Hours 89.50 Actual Hours
Actual Hours
3,000.00 7/1/2021
97.50 Varies
42.8.3 Reasonable Accommodation Fixed Fee 852.00 n/a n/a 852.00 7/1/2021 860.00
42.8.4 Variance Extension Fixed Fee 852.00 n/a n/a 852.00 7/1/2021 860.00
43. Zoning Amendment
43.1 Rezoning Application [B] Actual Hours Actual Hours n/a n/a Actual Hours 20,000.00
43.2 Zoning Text Amendment [B] Actual Hours Actual Hours n/a n/a Actual Hours 20,000.00
44. Zoning Verification Letter Fixed Fee 533.00 n/a n/a 533.00 7/1/2021 537.50
45. Other Fees
45.1 Refund processing fee (for overpayments < $15 - see notes section) Fixed Fee 17.00 State Law
45.2 Deposit forfeiture (security deposits or trust accounts left unclaimed after 4 years - see notes section)
Unclaimed
Deposit
Amount
Unclaimed Deposit
Amount
46. Hourly Rates with Overhead
16
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
46.1 Planning Service s
46.1.1 Planning Services - City Staff Hourly Rate 213.00 n/a n/a 213.00 7/1/2021 215.00
46.1.2 Expedited Planning Services - performed by consultant [A] Cost + 20% Admin Fee
Cost + 20%
Admin Fee
46.2 Engineering Service s
46.2.1 Processing Hourly Rate n/a 157.00 n/a 157.00 7/1/2020
46.2.2 Engineering Plan Check Hourly Rate n/a 279.00 n/a 279.00 7/1/2019
46.2.3 Engineering Inspection Hourly Rate n/a 176.00 n/a 176.00 7/1/2019
46.3 Building Division Service s
46.3.1 Processing [B] Hourly Rat e n/a n/a 103.00 103.00 7/1/2021 113.00 113.00
46.3.2 Plan Check [B] Hourly Rat e n/a n/a 179.00 179.00 7/1/2021 195.00 195.00
46.3.3 Inspection [B] Hourly Rat e n/a n/a 148.00 148.00 7/1/2021 158.00 158.00
46.4 Transportation Service s Hourly Rate 209.68 209.68 7/1/2021 47 Wireless Communication Facilities
47.1 Section 6409 Permit [D] Fixed Fee 1,065.00 279.00 89.50 1,433.50 7/1/2021 1,075.00 97.50 1,441.50
47.2 Administrative Permit [D] Fixed Fee 3,195.00 837.00 89.50 4,121.50 7/1/2021 3,225.00 97.50 4,129.50 17
Exhibit A to Attachment 1
Fees and Charges for Various Municipal Services
D. Permit Center Fees
Date of Last Adoption: 11‐9‐2021
Res. No: 21‐6042.2
Num Description (*) Fee Basis Plan Engr Bldg Tran Total Fee Deposit Date last updated Fee Basis Plan Engr Bldg Tran Total Fee Deposit Proposed Changes Effective 7/1/22 Current Fees
47.3 Minor Use Permit [D] Fixed Fee 6,390.00 1,674.00 89.50 8,153.50 7/1/2021 6,450.00 97.50 8,161.50
47.4 Master License Agreement Fee Fixed Fee 639.00 n/a n/a 639.00 7/1/2021 645.00
47.5 Pole-License Agreement Application Fixed Fee
500.00 for up to
five batched
applications
n/a n/a
500.00
11/9/2021 502.00 for up
to five
batched
applications
47.6 Pole-License Charge (MLA) Fixed Charge
per MLA
1545-2575 +
3% Annual
Escalation
n/a n/a
1545-2575 +
3% Annual
Escalation
11/9/2021
47.7 Pole-License Charge (PLA) Fixed charge
per PLA
295.04-384.96
+ 3% Annual
Escalation after
2030
295.04-
384.96 + 3%
Annual
Escalation
after 2030
11/9/2021
47.8 Small Wireless Facility Hourly Rate 1,065.00 279.00 89.50 1,366.00 1,433.50 11/9/2021 Actual Hours Actual
Hours
Actual
Hours 1,451.50
Notes
General:
Referenced in Schedule:
[C] Withdrawal application and refund of fee:
[D] Fixed fees include a maximum of two completeness reviews and two public meetings. Additional completeness reviews will be charged, based upon the adopted hourly rate. [E] Fee exempt from Technology Fee.
[F] City subsidized fee.
For services rendered by City staff which have no fee listed in this section of the fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for
the applicable City staff as provided in Table 1. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers required to process the specific application, including an administrative fee of 20% to cover the associated Citywide overhead costs.
Overpayment Information Any permit overpayment made by check of $15 or more will be processed for refund by check. Such refunds may take up to three weeks. Any permit overpayment made by check less than $15 will be forfeited by the applicant, as the cost to the City of processing such refunds exceeds the refund amount. Overpayments made by credit card follow the same guidelines unless the charge can be voided and correctly processed. [A] Security Deposits (also called Refundable Security Deposits) are required in an amount equal to the expected cost of restoring City property, public infrastructure or right-of-way to its original condition. Security deposits are refundable when the deposit condition has been satisfied, but may at that time be applied by the City to any unpaid fees, hourly charges, or other costs associated with the project, after construction or other pledged purposes have been met. Applicants must request refunds of security deposits within 30 days of acceptance by the City or 30 days of permit finalization (unless otherwise stated in the Master Fee Schedule.) Any deposits unclaimed after four years from the date of the deposit will be forfeited. [B] Trust Account Deposit Required. Fees billed on an hourly basis require an upfront deposit of estimated fees (see "Trust Account Information" below); the totals provided on this line item represent the required minimum
deposit. The Chief Building Official, City Engineer, Planning Manager or Economic Development Manager may adjust the required minimum deposit based on the project parameters and any additional information they may have. Additionally, all outside consultant costs required for the project are billed at actual cost plus 20% administrative costs to cover the City's costs of administering the requisite contract; a deposit to a trust account is required prior to any work commencing, and will be calculated based upon the consultant's estimate (including any contingency amount) plus 20%. Funds will be drawn down from the applicant's trust account as needed to pay the actual invoices and associated 20% admin fee on amounts paid.
Additional Trust Account Information Refunds of unused trust account balances will be provided upon request. Any amounts remaining in an inactive trust account will be forfeited by the depositor and/or applicant; if the remaining balance is $15 or less, account will be considered inactive after one year from date of last transaction, and in all other instances, the account will be considered inacti v
after four years from date of last transaction.
1) If written request to withdraw an application is submitted within three (3) workdays of filing an application, the full filing fee shall be refundable. (12-28-92) 2) If written request to withdraw an application is submitted after three (3) and within seven (7) workdays of filing an application, forty precent (40%) of the filing fee shall be refundable. (12-28-92) 3) If no written request for withdrawal is submitted by the time specified in 1) or 2) above, no part of the filing fee shall be refundable. (12-28-92) 18
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
T3a ‐ Building Division Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21.6042.1
Current Fee Proposed Update
Effective 7/1/22
A. Administrative Fee
Administrative Fee $51.50+0.000717V $56.50+0.000717V
where V= valuation of construction.
The administrative fee applies to each permit application or revision application.
This fee shall be paid at time of application.
The fee is a maximum of $500.
B. Technology Fee
A surcharge of the sum of administrative processing, plan review, and inspection fees.
10.5%
This fee applies to Building, Engineering and Planning Divisions.
C. Solar PV Permit (Residential and Commercial)
Base Plan Review Fee (0-15 kW) $89.50
Base Inspection Fee (0-15 kW) $222
Additional Plan Review Fee (per kW 15-50 kW) $2.56
Additional Inspection Fee (per kW 15-50 kW) $6.34
Additional Plan Review Fee (per kW over 50 kW) $0.90
Additional Inspection Fee (per kW over 50 kW) $1.11
(kW is AC kilowatts)
D. Work Item Based Fees
D.1 Reroof Permit Inspection Fee (Residential and Commercial) Inspection Fee $74 + 0.071A $79 + .079A
Where A = roof area in square feet.
D.2 Residential Furnace Replacement Inspection Fee $148.00 $158.00 Description
19
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
T3a ‐ Building Division Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21.6042.1
Current Fee Proposed Update
Effective 7/1/22 Description
D.3 Residential A/C Replacement Inspection Fee $148.00 $158.00 D.4 Residential HVAC Replacement Inspection Fee $222.00 $237.00 D.5 Commercial Electrical Service Replacement Inspection Fee $370.00 $395.00 D.6 Residential Electrical Service Replacement Inspection Fee $148.00 $158.00 D.7 Residential Sewer Line Replacement Inspection Fee $148.00 $158.00 D.8 Residential Water Heater Replacement Inspection Fee $148.00 $158.00 D.9 Residential Water Line Replacement Inspection Fee $148.00 $158.00 D.10 Residential Window/Door Replacement Inspection Fee (Single Family and Duplex Replacement Only) Retrofit (0-6 windows/doors) $222.00 $158.00
Retrofit (7+ windows/doors) $370.00 $237.00
New Construction (0-6 windows/doors) $296.00 $237.00
New Construction (7+ windows/doors) $444.00 $316.00
D.11 Residential In-Ground Pool (Single Family and Duplex Only) Plan Review Fee $268.50 $292.50
Inspection Fee $592.00 $632.00
D.12 Portable Spas and Portable Pools Placed at Grade (Single Family and Duplex Residential Only) Plan Review Fee $44.75 $48.74
Inspection Fee $74.00 $79.00
E. Not Used
F.
General Building Valuation-Based Fees
F.1. General Building Valuation-Based Plan Review Fees Includes required plan review for all construction codes adopted by the City. For projects where the scope of work only includes Plumbing, Electrical, and/or Mechanical work, use the Valuation-Based PEM Plan Review Fees table instead. The fee includes one round of comments plu s one back
check. Additional plan review required following the back check will be charged based upon the additional plan review hourly rate. This fee shall be paid at time of application.
20
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
T3a ‐ Building Division Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21.6042.1
Current Fee Proposed Update
Effective 7/1/22 Description
$100,000.01 to $500,000.00 Base Cost (for first $100,000) $1,282.35 Each additional $1,000 or fraction thereof $7.66
$500,000.01 to $1,000,000.00 Base Cost (for first $500,000) $4,345.76 Each additional $1,000 or fraction thereof $8.41
$1,000,000.01 and up Base Cost (for first $1,000,000) $8,549.03 Each additional $1,000 or fraction thereof $1.16
H. Additional Plan Review Fee (hourly) $179.00 $195.00 I. Additional Inspection Fees
I.1. When work is started prior to obtaining a permit Double the prescribed inspection fees.
I.2. Re-inspection Fees (hourly) $148.00 $158.00
I.3. Inspection Requests Outside Normal Business Hours (hourly - minimum 2 hours) $222.00
$444.00
J. Expedited Plan Review (Using Outside Consultants) Actual Cost + Admin
K. Construction Valuation
Where fees are based upon construction valuation, the Building Official may apply minimum valuations based upon the latest publication of International Code Council’s Building Valuation Data and/or upon the Building Official's published valuations for different project types. Final total valuation shall be set by the Building Official, as provided for in the City's adoption of the California Building Code. 21
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
T3a ‐ Building Division Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21.6042.1
Current Fee Proposed Update
Effective 7/1/22 Description
L. Appeal to Board of Appeal
Fee $115.00
Plus Public Notice Fees At Cost
M. Storm Water Pollution Prevention Compliance
Additional time above minimum (per hour with half hour minimum) $140 C3 service fee for permits increasing impervious surface area (percent of valuation) 0.12% N. Special service microfilm research request (hourly) $103.00 $113.00 P. Child Care Program (CMC 19.10.030) (PP 130)
0.50%
Q. Development Project Mitigation Fee for Fire Station No. 22 Mitigation fee $3,619.33
Plus Administrative fee $100.00
R. Recycling – Construction and Demolition Projects
R.1. Program Fee (CMC 8.20.390)
R.2. Performance Security Fee (CMC 8.20.370)
For Permit Value - $0 - $49,999, percentage assessed = 1.5% For Permit Value - $50,000 or more, percentage assessed = 2.0% S. Inclusionary Housing
S.1a In-lieu Fee per market-rate housing unit (project sizes 10 units or greater) 1 Ownership, as of January 1, 2019 $9 per square foot $10 per square foot S.1b In-Lieu Fee per market rate housing unit (project sizes 5-9 units) 1 Ownership, as of July 1, 2018*
5 units $4 per square foot
6-7 units $6 per square foot
8-9 units $8 per square foot
Non- restricted project fee due upon issuance of Certificate of Occupancy (percent of valuation) Percentage assessed to the permit value of covered projects (CMC 8.20.350). The fee is capped at $4,500 and $18,000 for residential and commercial projects, respectively. This fee is non-refundable. Percentage assessed = 0.3% Percentage assessed to the permit value of covered projects (CMC 8.20.350). The minimum fee is $250 for projects under $10,000 in value and $500 for projects $10,000 in value, or greater. The maximum fee is capped at $25,000. *For projects not deemed complete by July 1, 2018. For those projects deemed complete prior to July 1, 2018, the previous fee of $5,043 per unit will be a
pplied
22
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
T3a ‐ Building Division Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21.6042.1
Current Fee Proposed Update
Effective 7/1/22 Description
S.2 Rental Housing Impact Fee per market rate housing unit (projects of 10 units or greater) $0 S.3 Compliance Monitoring
Rental (annual) $38.00
Ownership (per change of ownership) $262.00
T. Building Code Enforcement
T.1. Reinspection Fee (hourly) $148.00 $158.00
T.1.1 Recording Notice of Substandard Conditions with County Recorders Office Fee $370.00 $395.00
County Recorders Fee At Cost
T.1.2 Issuance of First Notice of Violation or Notice and Order to Comply Fee $296.00 $316.00 T.1.3 Issuance of Subsequent Notices of Violation or Notice and Order to Comply Fee $148.00 $158.00 T.2. Summary Abatement
Fee At Cost
Plus Administrative fee (percent of cost) 30%
T.3. Public Nuisance Administrative Fines [per Gov. Code Sections 53069.4, 25132(b), and 36900(b)] First issuance in 12 months $100.00
Second issuance in 12 months $200.00
Third and subsequent issuance in 12 months $500.00
T.4. Building and Safety Code Violations [Per Gov. Code Sections 53069.4, 25132(c), and 36900(c)] First issuance in 12 months 130.00
Second issuance in 12 months 700.00
Third and subsequent issuance in 12 months 1,300.00
Third and subsequent issuance in 24 months if commercial property with visible refuse or unauthorized use 2,500.00 U. Building Division Services
Processing (hourly) $103.00 $113.00
Plan Review (hourly) $179.00 $195.00
Inspection (hourly) $148.00 $158.00
For services rendered by City staff which have no fee listed in this section of the fee schedule, the City Manager or the City Manager's designee shall determine the appropriate fee based on the established hourly rates for the applicable City staff as provided in Table 1. Additionally, the City will pass-through to the applicant any discrete costs incurred from the use of external service providers if required to process the specific application, including an administrative fee of 20% to cover the associated Citywide overhead costs. 1 For sale condo units shall be assessed the rental fees 23
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
T4 ‐ Annual Sewer Charge Fees
Date of Last Adoption: 4‐27‐2021
Res. No:21‐6042.1
Table 4 - Annual Sewer Service Charge (CMC 13.05.020(c)) (7-1-2021)* Service Type Current Fee
Proposed Changes
Effective 7/1/22
RESIDENTIAL OWNERS
1. Minimum rate for any premises $672.00 $717.00
2. Each single-family dwelling unit $672.00 $717.00
3. Each dwelling unit in a multiple dwelling structure $672.00 per unit $717.00 per unit
4. Mobile Home Park $672.00 per space $717.00 per space COMMERCIAL OWNERS—Charge based upon quantity of water used in cubic feet
1. Minimum rate for any premises $672.00 $717.00
2. Bowling Alleys $5.94/100Cu. Ft. $6.34/100Cu. Ft.
3. Car Washes $5.94/100Cu. Ft. $6.34/100Cu. Ft.
4. Health Studios and Gymnasiums $5.94/100Cu. Ft. $6.34/100Cu. Ft.
5. Hospitals--Convalescent $5.94/100Cu. Ft. $6.34/100Cu. Ft.
6. Multiple Lodging Structures (hotels, motels and rooming houses) $5.94/100Cu. Ft. $6.34/100Cu. Ft.
7. Laundromats and Laundries $5.94/100Cu. Ft. $6.34/100Cu. Ft.
8. Restaurants $11.82/100Cu. Ft. $12.61/100Cu. Ft.
Restaurants with pretreatment facilities approved annually $6.72/100Cu. Ft. $7.17/100Cu. Ft.
9. Bakeries Determined
Individually
10. All others $6.72/100Cu. Ft. $7.17/100Cu. Ft.
INSTITUTIONAL OWNERS
1. Minimum rate for any premises $672.00 $717.00
2. As defined in Section 110-31, except for Convalescent Hospitals $6.72/100Cu. Ft. $7.17/100Cu. Ft.
INDUSTRIAL OWNERS—Charge based upon quantity of water used and quality of effluent
1. Minimum rate for any premises $672.00 $717.00
2. Flow/Million Gallons $5,214.00 $5,563.00
3. Biochemical Oxygen Demand (B.O.D.) per thousand pounds $1,225.00 $1,307.00
4. Suspended Solid (S.S.) per thousand pounds $1,043.00 $1,113.00
SPECIAL DISCHARGE PERMITS, AS ISSUED BY THE DISTRICT
1. Charge based upon quantity of water used and quality of effluent Determined SPECIAL CONTRACTUAL AGREEMENT Determined
* The charges are set by separate City Ordinance under Concord Municipal Code Section 13.05.020(c) and are duplicated here for ease of reference. 24
Exhibit A. Resolution 78 6042
Fees and Charges for Various Municipal Services
E. Police Fees
Date of Last Adoption: 4-27-2021
Res. No:21-6042.1
Num Description Current Fee
Proposed
Changes
Effective
7/1/22
Deposit Date last
updated
12.2. Administrative processing fee See B,1 7/1/2004
12.3. Fingerprint processing fee See E.10 7/1/1995
13 Parking Enforcement
13.1. California Vehicle Code Table 5 7/1/2014
13.2. Concord Municipal Code Table 6 7/1/2014
13.3. Late Fees 7/1/2007
13.3.1. Sections 22507.8a, 22507.8b., 22507.8c, 22511.57a, 22511.57b, 22511.57c, 22522 (percent of fine) 20% 7/1/2007
13.3.2. All other sections (percent of fine) 100% 7/1/2007
13.3.3. Department of Motor Vehicles (DMV) hold (per hold) 10.00 7/1/2018
13.3.4. State Franchise Tax Board (FTB) fee - social security request 10.00 7/1/2018
13.3.5. State Franchise Tax Board (FTB) fee - percent of outstanding balance submittals 17.50% 7/1/2018 14 Police Reports
14.1. Per report 4 7/ 1/2007
14.2. Per copy .010 per page 7/1/2016
15 Processing of Photographs
15.1 . Handling fee 24.00 7/1/2018
15.2. 4 x 6 print 1.25 7/ 1/2018
15.3. 5 x 7 print 4.25 7/ 1/2018
15.4. 8 x 10 print 7.25 7/ 1/2018
15.5. Rush reprint orders (within 10 business days)
15.5.1. 4 x 6 (each print) 3.00 7/ 1/2018
15.5.2. 5 x 7 (each print) 7.00 7/ 1/2018
15.5.3. 8 x 10 (each print) 12.00 7/1/2018
15.6. Electronic Data Request (Existing)Copy of digital photo disk (each disk) 7.00 7/ 1/2018
15.7. Electronic Data Request (non-existing file) copy of producing disk & mailing…………….…… 36.00 7/1/2019 16 Public Motor Vehicle Permits
16.1. Vehicle Permit (CMC 5.95.140(a))
16.1.1. Annual permit fee – 1st vehicle 238.00 7/1/2019
16.1.2. Application processing fee for Taxi Business (includes State fee) 597.00 7/1/2019
16.1.3. Each additional vehicle 119.00 7/1/2019
16.1.4. Late payment penalty (per month) 20% 5/12/1986
16.1.4.1 Maximum (cumulative) 50% 5/12/1986
16.1.5. Reinspection fee (CMC 118-90(l)) 34.00 7/1/2016
16.1.6. Administrative processing fee See B.1
16.2. Driver Permits (CMC 5.95.210(a))
16.2.1. Application fee – New 72.00 7/1/2019
16.2.1.1 Plus State and FBI Livescan fee
16.2.2. Application fee – Renewal 36.00 7/1/2019
16.2.2.1 Plus State and FBI Livescan fee
16.2.3. Fingerprint processing fee See E.10
16.2.4. Administrative processing fee See B.1
16.2.5. Driver Transfer Fee 26.00 7/1/2019
16.2.6. Replacement Driver ID Card 12.00 7/1/2019
16.3. Taxicab Rates (CMC 5.95.300(d))
16.3.1. Drop fee 3.05 3.50 7/1/2014
16.3.2. Each 1/10th mile thereafter 0.30 0.35 7/1/2014
16.3.3. Or
Each mile thereafter 3.00 3.50 7/1/2014
16.3.4. Delivery – meter rate plus 4.25 5.00 7/1/2014
16.3.5. Waiting time, traffic delay per every 36 seconds 0.30 0.35 7/1/2014
16.3.6. Waiting time, traffic delay per hour 30.00 35.00 7/1/2014 17 Review of Local Criminal History
17.1. Summary information by individuals who may have records with Police Department (non-refundable) 26.00 7/ 1/2019 18 Rotation Towing Services (CMC 2.50.210)
18.1. Application and Administration Fees
18.1.1. Initial application fee for Rotational Tow Truck Business 216.00 7/1/2019
18.1.2. Driver Application Fee – New 72.00 7/1/2019
18.1.2.1 Plus State and FBI Livescan Fees
18.1.3. Driver Application Fee – Renewal 36.00 7/1/2019
18.1.4. Driver Transfer Fee 26.00 7/1/2019
18.1.5. Replacement I.D. card 12.00 7/1/2018
18.1.6. Franchise Fee Per Tow 50.00 65.00 7/1/2021
18.2. Maximum Rates Chargeable by Rotation List Towing Operators
18.2.1. Straight tow of one hour or less 200.00 7/1/2021
18.2.2. Tow with dolly or car carrier when necessary. Operator must indicate on tow bill why a dolly or car carrier was used 200.00 7/1/2021
18.2.3. Tow services exceeding one hour 200.00 7/1/2021
18.2.3.1 Or
Per 15-minute intervals 50.00 7/1/2021
18.2.4. Non-tow service call – per half hour 40.00 9/11/2012
18.2.5. Per towed mile outside the City limits 6.25 7/ 1/2009 No mileage may be charged for towing to an operator's lot located outside the City limits.
18.2.6. Daily storage fee from midnight to midnight – Class A 100.00 7/1/2021
18.2.7. Gate release charge for vehicle pickup before 8 a.m. or after 5 p.m. 100.00 7/1/2021
18.2.8. Release fee per vehicle 50.00 9/11/2012
18.2.9. Drop fee per vehicle 87.50 9/11/2012
18.2.10. Class B (26,001 GVW) tow of one hour or less 300.00 7/1/2021
18.2.11. Daily storage fee from midnight to midnight - Class B 100.00 7/1/2021 25
Exhibit A. Resolution 78-6042
Fees and Charges for Various Municipal Services
F. Sanitation and Refuse Fees
Date of Last Adoption: 4‐27‐2021
Res. No: 21‐6042.1
21.55% 14% 3% 6.60% 9.76%
Num Description Current Fee
[3]
One-Time
Increase
Base Rate
Option 1
Base Rate
Option 2 *
Base Rate
Option 3
Base Rate
Option 4 *
Date last
updated
F. Sanitation and Refuse Fees
1 Refuse Collection (CMC 8.20.210)
1.1. Collection of refuse once a week on a regular schedule up to 32 gallons, 64 gallons or 96 gallons, in containers supplied by the City’s Franchise Waste Hauler, each level of service includes 64 gallons of recycling and 96 gallons of yard waste per week: 1/1/2010
1.1.1. Single Family
1.1.1.1. 96 gallon refuse service 58.26 70.82 66.42 60.01 62.11 63.95 7/1/2022
1.1.1.2. 64 gallon refuse service 47.51 57.75 54.16 48.94 50.65 52.15 7/1/2022
1.1.1.3. 32 gallon refuse service 35.14 42.71 40.06 36.19 37.46 38.57 7/1/2022
1.1.1.4. 20 gallon refuse service [1] 28.86 35.08 32.90 29.73 30.76 31.68 7/1/2022
1.1.2. Condo/Townhouse [2] (No yard waste) - - - - -
1.1.2.1. 96 gallon refuse service 57.20 69.53 65.21 58.92 60.98 62.78 7/1/2022
1.1.2.2. 64 gallon refuse service 46.46 56.47 52.96 47.85 49.53 50.99 7/1/2022
1.1.2.3. 32 gallon refuse service 34.08 41.42 38.85 35.10 36.33 37.41 7/1/2022
1.2. Each additional recycling or yard waste container 11.96 14.54 13.63 12.32 12.75 13.13 7/1/2022
1.3. Low Income Senior [1]* 29.60 35.98 33.74 30.49 31.55 32.49 7/1/2022 *Low income senior is defined as 65 years of age, or older, and having an income below HUD (Housing and Urban Development) guideline for “Very Low Income” for the Oakland-Fremont area. 1/1/2010 Notes:
[1] This service is no longer available to new customers. [2]
This rate applies to residential customers living in an approved complex. [3] The rate includes a recycling surcharge that will remain in effect until the comprehensive rate review process has been completed and new rates take effect, approximately January 2022. * Option 2 and Option 4 were selected by the I&F Committee as the best options for Council consideration. 26
1 CITY OF CONCORD
Number:
Authority:
Effective:
Revised:
Reviewed:
Initiating Dept.:
170
Council Motion
04-26-2016
11-01-2016
FIN
USER FEES AND CHARGES RECOVERY
1. PURPOSE
To establish policy guidelines for setting and updating User Fees and Charges; establish cost recovery goals; and ensure compliance with State law.
2. GENERAL
California Constitution Articles XIIIC and XIIID [Prop 218], Article XIIIC §1(e) [Prop 26] and Article XIIIA [Proposition 13] have placed both substantive and procedural limits on cities’ ability to impose fees and charges. This policy establishes a process for Concord’s User Fees and Charges to be reviewed and updated on an ongoing basis to ensure that fees do not exceed the City’s costs of providing services; keep pace with changes in the costs of providing the services; and keep pace with changes in methods of levels of service delivery.
3. REVIEW AND UPDATE
A comprehensive analysis of City costs and fees should be conducted at least every five years. In the interim, fees will be adjusted by annual changes in labor costs as approved by the City Council with the exception of Special Events Fees, which shall be adjusted by 3% per annum. Fees may also be changed based on supplemental analysis whenever there have been significant changes in the method, level or cost of service delivery.
4. POLICY
It is the policy of the City of Concord to set User Fees and Charges based on cost recovery levels in lieu of fully subsidizing fee-related activities with General Fund dollars. The cost recovery levels are reflective of the following policy statements.
4.1 Community-wide vs. Private Benefit: The level of user fee cost recovery should consider the community-wide versus private-benefit nature of the program or activity. The use of general- purpose revenues is appropriate for community-wide services, while user fees are appropriate for services that are of special benefit to easily identified individuals or groups.
4.2 Service Recipient vs. Service Driver: The concept of the service recipient versus service driver is particularly important for regulated activities such as development review and police-issued permits. It could be argued that the applicant is not the beneficiary of the City's development review efforts and that the community is the primary beneficiary. However, the applicant is the driver of development review costs, and as such, cost recovery from the applicant is appropriate.
4.3 Consistency with City Goals and Policies: City policies and Council goals related to the community’s quality of life may also be factors in setting cost recovery levels. For example, fees can promote city-wide goals, facilitate environmental stewardship, encourage compliance
POLICY & PROCEDURE
Attachment 2
POLICY & PROCEDURE NO. 170
with City regulations (e.g. water heater permits, minor but important permits to ensure safety) or discourage certain actions (e.g. false alarms, which negatively impact law enforcement).
4.4 Elasticity of Demand for Services: The level of cost recovery and related pricing of services can significantly affect the demand and subsequent level of services provided. At full cost recovery, this has the specific advantage of ensuring that the City is providing services for which there is genuinely a market that is not overly-stimulated by low fees.
Conversely, high levels of cost recovery will negatively impact the delivery of services to lower income groups. This negative feature is especially pronounced, and works against public policy, if the services are specifically targeted to low income groups.
4.5 Availability of Services from the Private Sector: High cost recovery levels are generally sought in situations where the service is available from other sources in order to preserve taxpayer funds for core City services. Conversely, services that are not available from other sources and are typically delivered when residents experience an emergency typically have low or zero cost recovery levels (e.g. response to a 911 call).
It should be noted, that the current Master Fee Schedule for recreational services includes a lower rate for Concord residents than residents living outside of Concord.
4.6 Feasibility of Collection and Recovery: Although it may be determined that a high level of cost recovery may be appropriate for specific services, it may be impractical or too costly to estab- lish a system to identify and charge the user. Accordingly, the feasibility of assessing and col- lecting charges should also be considered in developing user fees, especially if significant pro- gram costs are intended to be financed from that source.
POLICY & PROCEDURE NO. 170
Target Cost Recovery Levels
Based on these policy statements, the following table overlays certain cost recovery levels grouped in low (0- 40%), medium (40.1% to 80%), and high (80.1% to 100%) cost recovery ranges. It is important to note that these groupings provide policy guidance and are not absolute. Some policy statements may weigh more heavily than others, which may result in a different cost recovery level grouping for particular fees. For example, fees for recre- ational activities are expected to be set in general at the medium cost recovery level. However, fees for recreational activities for which there is high demand may have a high cost recovery level due to high enrollment levels per class. It is important to note that User Fees and Charges will be reviewed at least biennially by the City Council as part of approval of the Master Fee Schedule.
Cost Recovery Levels Cost Recovery
Percentage Rate
Policy Considerations
(one or all may apply)
Low 0% - 40% • Public at-large benefits
• No intended relationship between fee
and benefit received
• Fee collection not cost effective would
discourage compliance
• No intent to limit use of service
• Affordability of service to low-income
residents
Medium 40.1% - 80% • Services share factors of both low and high recovery levels
High 80.1% - 100% • Individuals receive most of benefit of service
• Other alternative service providers
• Use is regulatory or specifically dis-
couraged
FINA
L REPORT
City of Concord
Submitted electronically on October 22, 2020
Submitted electronically: March 14, 2022
Base Year
Rate Adjustment
Attachment 3
1512 Eureka Road, Suite 220, Roseville, CA 95661 | p 916.782.7821 | f 916.782.7824 | www.r3cgi.com March 14, 2022
Mr. Craig Blythe
Administrative Services Manager
Public Works
1455 Gasoline Alley, Concord, CA 94520
submitted via email: [email protected]
SUBJECT: Review of Mt. Diablo Resource Recovery’s 2022 Base Year Rate Application
Dear Mr. Blythe,
R3 Consulting Group (R3) is engaged by the City of Concord (City) to review the 2022 Residential Base Year Rate Application from its franchised solid waste hauler, Mt. Diablo Resource Recovery (MDRR).
This report presents the results of R3’s review and our recommended adjustments to MDRR’s 2022 Base Year Rate Application. A copy of MDRR’s 2022 Base Year Rate Application is provided in Attachment 1 and a copy of the application with R3’s adjustments is provided in Attachment 2.
MDRR’s original 2022 Residential Base Year Rate Application calculated a required increase in revenues of approximately $4,300,000, which equated to a one-time rate increase of 27.11%. Based on our review we are recommending adjustments that would result in a one-time rate increase of
21.55%, with a revised projected additional revenue requirement of approximately $3,420,000.
In addition to a one-time rate increase scenario described above, MDRR proposed a 5-year schedule to phase the rate increase in over time, which will decrease the immediate impact to ratepayers such that the revenue generating outcomes of a 21.55% one-time rate increase are achieved over 5-years instead of one. Several equivalent alternatives for the 5-year phase-in schedule are included in this report.
* * * * * * *
We appreciate the opportunity to be of service to the City and would like to thank MDRR’s staff for their support during the review. Should you have any questions regarding this report or need any additional information, please do not hesitate to reach out directly.
Sincerely,
Jordan Muratsuchi | Sr. Project Analyst Garth Schultz | Principal R3 Consulting Group, Inc. R3 Consulting Group, Inc.
916.655.2104 | [email protected] 510.292.0853 | [email protected]
TABLE OF CONTENTS
City of Concord | Base Year Rate Adjustment TOC
1. Introduction
page 1
2. Review of Rate Application
page 3
3. Rate Adjustment Implementation
page 10
4. Comparison of Rates
page 13
5. Findings & Recommendations
page 14
Attachment 1:
MDRR’s 2022 Base Year Rate Application
Attachment 2:
Base Year Rate Application with Recommended Adjustments
1. INTRODUCTION
City of Concord | Base Year Rate Adjustment 1 of 14 Background
Service Areas
The City has an exclusive franchise agreement with MDRR to collect and remove for disposal and recycling, residential and commercial solid waste and recyclable materials. This contract has a 15-year term which automatically extends by 12 months at the end of every year until notice of termination.
In addition to the City, MDRR also services accounts in neighboring communities including Pittsburg, Oakley, Rio Vista, Brentwood, Bay Point, and Discovery Bay.
Overview of Rate Setting Process
Per Section 15 of the City’s Franchise Agreement (Agreement) with MDRR, the City and MDRR adopted the Rate Setting Manual for the purposes of determining collection rates which are fair to City of Concord residents while at the same time providing a fair return to the hauler. The Rate Setting Manual contains the methods of adjusting rates and describes the adjustment process between the City and MDRR.
That methodology primarily involves two distinct rate setting purposes:
》 Interim Year Rate Setting Process; and
》 Base Year Rate Setting Process.
Base year rate adjustments occur no more than every six (6) years with indexed based rate adjustments used to set the rates years between base rate adjustments.
Base Year Rate Setting Process
For the upcoming rate year (July 1, 2022 – June 30, 2023) the current rates are to be adjusted based on the Base Year Rate Setting Process.
With the Base Year Rate Application, the franchised hauler submits financial statements for the previously completed fiscal year, which serve as the base documents for the Rate Application.
The Base Year Rate Application is based on three years of data:
》 Actual results for the most recently completed year (2020 at the time the application was received), which are based on the audited financial statements; 》 Projected results for the current year (2021), which are to be based on year-to-date information available at the time the application is submitted; and 》 Projected results for the next year (2022 - the Base Year).
MDRR did not provide the current year (2021) projections at the time of submittal, but provided a Refuse Rate Index (RRI) rate increases to each cost category in a separate document. These RRI calculations assisted the review, however all expense projections are based on 2020 audited values. Therefore, all adjustments described in this report are based on the audited 2020 values, and not 2021 actuals.
Overall, per the Base Year Rate Application rate adjustment approach, rate adjustments are established based on the hauler’s projected revenue requirement.
The revenue requirement is defined as the sum of the following:
》 Allowed costs;
》 Allowable operating profit; and
》 Pass through costs.
Introduction
City of Concord | Base Year Rate Adjustment 2 of 14 Change in Base Year Frequency
The current Agreement allows for a base year rate adjustment no more than every six (6) years. It is R3’s understanding that the City and MDRR intend to amend the Agreement to allow for base year rate adjustments every five (5) years. MDRR’s base year rate application is based on a five-year schedule and thus R3’s review followed such methodology.
Change in Commercial Rates
The City’s commercial solid waste rates are set by MDRR. Although the base year rate application (and proposed rate adjustment) is focused entirely on the residential line of business, Scope of Analysis
Our review of the Base Year Rate Application included but was not limited to the following:
》 Reviewed the 2022 Base Year Rate Application for consistency with the Rate Setting Manual Methodology;
》 Reviewed the 2022 Base Year Rate Application for mathematical accuracy; 》 Reviewed MDRR’s 2019 and 2020 audited financial statements; 》 Reviewed 2021 and 2022 projected revenues and expenses for reasonableness, including general consistency with changes in reported revenues, accounts, and tonnages; and 》 Conducted a survey of rates in neighboring communities.
2. REVIEW OF RATE APPLICATION
City of Concord | Base Year Rate Adjustment 3 of 14 Allowable Operating Costs
Direct Labor
MDRR has a collective bargaining agreement (CBA) with its collection drivers that sets rates for wages and benefits. MDRR projected a overall 3.51% increase in Direct Labor costs for 2022 as compared to 2020. The largest portion of this increase is related to pension benefits.
Assessment
MDRR’s projected direct labor expense increase is in alignment with series data from the Bureau of Labor Statistics. These adjustments are based on MDRR’s CBA.
Adjustments
No adjustments.
Tipping Fee Profit (up to $51/ton)
Page I-5 of the Rate Setting Manual allows MDRR to claim operating profit on tipping fees up to $51/ton.
Any excess tipping fee cost is categorized as a pass-through cost (no profit allowed).
Assessment
MDRR is allowed to claim profit on up to $51/ton of tipping fees, however MDRR listed $55/ton in their rate application. During review of the application, MDRR agreed to adjust this limit to $51/ton.
Adjustments
Adjusted MDRR’s allowable profit on tipping fees from $55/ton to $51/ton.
Corporate Overhead
Page III-7 of the Rate Setting Manual limits corporate overhead expenses to a maximum of three percent (3%) of total operating costs.
Assessment
MDRR requested a corporate overhead expense allotment of three percent (3%) of total operating costs.
This equates to approximately 3.40% increase from 2020 corporate overhead costs.
Adjustments
Reduced corporate overhead costs by $9,107 in alignment with the reduction in total operating cost derived from other recommended adjustments.
Office Salaries
MDRR projected an increase in office salaires of 3.80% above 2020 expenses.
Assessment
MDRR’s requested increase in office salary expense is reasonable and in alignment with findings from the BLS.
Adjustments
No adjustments.
Review of Rate Application
City of Concord | Base Year Rate Adjustment 4 of 14 General and Administrative Costs
General and Administrative (G&A) costs represent a wide range of expenses for daily operational needs.
MDRR requested an overall increase in G&A expenses of 1.83% from 2020 expenses, which includes a 45% increase to gasoline. The increases to individual expense categories other than gasoline are relatively minor and are between 1.70% and 1.80%.
Assessment
We assessed each expense item included in G&A costs and noted only minor increases to expense items other than gasoline.
During the application review, MDRR noted that the requested 45% increase in gasoline expenses is not directly based off of industry data but rather an attempt to estimate the true costs when taking into account the current volatility in the economy and fuel prices. Furthermore, MDRR noted that when setting the 2021 (current) rates, a year-over-year review of fuel price indices demonstrated a decrease in prices.
Despite this year-over-year decrease, MDRR noted that they used a 20% increase in fuel projection when calculating 2021 rates in anticipation for a market rebound.
MDRR also requested a 65% increase for diesel and natural gas expenses for the same reasoning. The pandemic resulted in volatitlity particularly in fuel costs, which explain the abnormal annual shifts in cost.
While fuel prices plummeted in 2020, prices rebounded in 2021 and continue to remain high. MDRR noted to R3 that it would be open to discussing revised methods for calculating and projecting fuel expenses that more closely follows market trends.
After further examination of MDRR’s actual fuel expenses in 2020 and 2021, the original request for a 45% increase from 2020 fuel expenses was determined to be reasonable.
Adjustments
No adjustments.
Operating Ratio
The Rate Setting Manual establishes a range of from 88% to 92% for the target operating ratio (profit) used to calculate the Base Year rate adjustment.
Assessment
MDRR’s Rate Application set its 2022 profit level equal to an 90% operating ratio, consistent with the range set forth in the Rate Setting Manual, and at the general midpoint of what R3 observes in other such rate application processes we conduct. The total operating profit projected for the 2022 base year is $1,935,566.
Adjustments
No adjustments.
Review of Rate Application
City of Concord | Base Year Rate Adjustment 5 of 14 Pass-Through Costs (Not Allowable on Profit Ratio)
Trucking Charges
MDRR projected an overall increase of 3.87% to trucking charges, a pass-through expense category that includes rental equipment (majority of the expense), depreciation, and fuel charges.
Assessment
MDRR did not project an increase to rental equipment costs, projected a 3.7% increase in depreciation expenses, and is projecting a 45% increase in both diesel and compressed natural gas (CNG) costs.
Similar to the gasoline projection, MDRR noted that their fuel projection was based on an attempt to better anticipate fuel expenses in a time when the market continues to experience volatility.
An examination of the diesel price index from the BLS (U.S. city average) concurs with MDRR in demonstrating a year-over-year decrease (-20.86%) in diesel prices heading into 2021, and demonstrates a 63.98% year-over-year increase heading into 2022. In an attempt to reduce the unusual volatility experienced in 2020, the annual average change from 2019 to 2021 was calculated, resulting in an increase of 29.78%. Since MDRR received a 20% increase in fuel in the 2021 rates (as opposed to a decrease as demonstrated by BLS data), a base year diesel expense increase of 29.78% over 2020 expenses is reasonable and supported by industry data.
An examination of the CNG price records from Pacific Gas & Energy (U.S. city average) demonstrates an
18.28% year-over-year increase from 2019 to 2020 (which was used in setting 2021 rates through the RRI process) and a 17.53% year-over-year increase from 2020 to 2021. The annual average change from 2019 to 2021 results in an increase of 39.10%.
However after further examination of MDRR’s actual fuel expenses in 2020 and 2021, the original request for a 45% increase from 2020 fuel expenses was determined to be reasonable.
Adjustments
No adjustments.
Tipping Fees
MDRR requested a tipping fee increase of 1.61% over 2020 expenses resulting from a CPI rate increase.
In addition to the CPI increase, MDRR requested $115,264 in increased tipping fees for organic waste related to implementation of SB 1383.
Assessment
MDRR’s requested tip fee increase of 1.61% ties to the gate rate increase at the Recycling Center and Transfer Station, and was approved by City of Pittsburg Council Resolution in 2021. MDRR’s request for an additional $115,264 in organic waste tipping fees results from a $6.25/ton increase in the fees to match other materials.
MDRR is permitted to claim operating profit on tipping fees up to $51/ton, after which any additional tipping fees are to be treated as pass-through costs. As noted previously, MDRR originally listed profit on $55/ton in tipping fees, which after review was subsequently adjusted to $51/ton. After allocating $51/ton to operating costs, the remaining tipping fees are correctly categorized as pass-through costs.
Adjustments
No adjustments.
Review of Rate Application
City of Concord | Base Year Rate Adjustment 6 of 14 Franchise Fees
Section 17 of the franchise agreement sets the franchise fee at 13.5% of gross revenues for FY 2017/18 through FY 2021/22. The franchise agreement further defines “gross revenues” as revenue or compensation derived “without subtracting franchise fees or any other cost of doing business.” Thus, the calculation of franchise fees should include such estimated fees as part of gross revenues. Such calculation should be taken with an iterative approach. Additionally, Section 17 of the franchise agreement provisions for the re-examination of the City’s percentage (%) franchise fee during each base year review to confirm its reasonableness in relation to the residential rate structure.
MDRR projected 2022 base year franchise fees to be $6.4 million, which is a 20.21% increase from 2020 values.
Assessment
The adjustments discussed in this report affect the projected gross revenues which in turn affects the amount of franchise fees owed to the City. After making the adjustments herein, MDRR’s projected annual base year franchise fees were reduced to approximately $6.21 million.
Secondly, although MDRR estimated franchise fees based on 13.5% of gross revenues, the franchise fees were subtracted from the gross revenues which is not in alignment with Section 17.a. of the franchise agreement. After adjusting the calculation such that franchise fees are categorized as gross revenues, the projected annual base year franchise fees rose to approximately $6.29 million.
The projected $6.29 million in base year franchise fees represent a $930,000 or 17.45% increase over franchise fee payments in 2020, a large increase that is a result of an unusually high base rate request spurred largely by new SB 1383 related expenses.
Adjustments
Adjusted franchise fees from $6,412,075 to $6,290,494 in accordance with the above.
Additional Expenses to the Base Year Rate Application
In addition to the standard base year application, MDRR requested funding for additional expenses largely in relation to implementing SB 1383 requirements. These additional expenses include operating costs, capital expenditure costs, and tipping fee expenses.
Additional Operating Costs
After submission of the base year rate application, MDRR communicated that there were two additional expenses not accounted for in the application.
The first expense was an additional half-time allotment of code enforcement for the City. MDRR currently remits payment to the City to cover the cost of a half-time code enforcement officer, which is approximately $70,000. This additional half-time code enforcement work brings the total expense to that of a full-time code enforcement officer (fully loaded), which is approximately $133,363. Therefore, an additional $60,363 was added to G&A expenses in the rate application.
The second expense related to the debris box services provided annually to the City. MDRR provides up to 540 debris box collections for City usage as well as up to 300 debris box collections for the City’s Neighborhood Preservation events. In most years there has not been a need to service the full allotment and as such MDRR projected the number of debris box events based past years. However, for the base year projections MDRR requested funding to cover the total potential debris box collections. This resulted in an additional $330,580 in total expenses, including tipping fees and profit, and which was added to the total operating costs.
Review of Rate Application
City of Concord | Base Year Rate Adjustment 7 of 14 In addition, MDRR requested $743,497 for new vehicles, which was listed in the original application submittal.
Tipping Fees
MDRR sends all collected material to it’s Recycling Center and Transfer Station in the City of Pittsburg.
The City of Pittsburg recently approved a $16.25/ton increase to the tipping fee to fund processing and SB 1383 related expenses including organic processing infrastructure. However, this increase was approved as a three-year phase-in, with equivalent annual increases over the next three years.
MDRR allocates the $16.25/ton tip fee increase to four different expenses: On-site maintenance building ($0.75/ton), organics building & infrastructure ($4.75/ton), recyclables proceesing fee ($6.50/ton), and SB 1383 post collection operations ($4.25/ton).
Although the tip fee escalates evenly over the next three years, MDRR originally requested the full amount in the 2022 base year, which would result in overpayment of tipping fees to MDRR for the next two years. Upon review and discussion, MDRR agreed to include only the first year of the tip fee increase in the base year rate application, whereas the next two annual RRI adjustments will factor in the tip fee increase to fully recover costs.
For the 2023 and 2024 RRI calculations, this will be accomplished by MDRR including a additional $5.42 per ton for “Disposal Fees” in addition to the annual year over year increase in disposal fees. This will be accomplished by MDRR calculating the annual average of the 2022 gate rates PLUS $5.42 per ton divided by the annual average 2021 gate rate, yielding the percentage change in the Disposal Fees component of MDRR’s RRI application. The result is expected to be an approximate 1.65% above the baseline RRI increase in 2023 and 2024.
It should be noted that, per Page I-6 of the Rate Setting Manual, the annual RRI shall be capped at 7%.
As of the writing of this report, it is anticipated that inflation may result in higher RRI figures than have been experienced in recent years. The combined effects of inflation and the increases in disposal fees referenced above may result in a calculated RRI in 2023 and/or 2024 that exceeds the 7% cap. In the even that occurs, MDRR may request a special extraordinary adjustment to the rates, as described on Page I-7 of the Rate Setting Manual.
SB 1383 Expenses
MDRR requested $380,976 for SB 1383 G&A expenses pertaining to cart, lid, and label depreciation, food scrap pails, outreach and education, and contamination monitoring (lid flips).
Assessment
The pails, outreach and education, and monitoring expenses are projected as a single year expense, while carts, lids, and label depreciation are projected as annual expenses over the next five years. When calculating depreciation expenses for the base year application, MDRR included the incremental depreciation costs that will be incurred each of the next five years.
Additionally, the SB 1383 expenses included costs for additional labor ($83,473) and an additional collection route ($142,517). No adjustments were made to these expenses and they were determined to be reasonable.
Adjustments
Adjusted SB 1383-related additional Tipping Fees from $1,516,271 to $505,424.
Review of Rate Application
City of Concord | Base Year Rate Adjustment 8 of 14 Total Projected Expenses
MDRR’s total projected expenses are comprised of Allowable Costs (those from which profit can be generated on), Operating Profit, and Pass-through costs. The sum of these expenses yields the total revenue requirement - the total annual revenue required from rate payers. Table 1 shows the total adjustment for each major expense category and the total projected revenue requirement based on those adjustments.
Total Projected Revenues
MDRR projected a 0.74% increase in residential revenues at current rates for 2022 as compared to revenue from 2020. MDRR sets commercial rates and has proposed a 9.00% increase to those rates.
MDRR projected recycled material sales to amount to $131,794 in 2022, which is a calculated average of sales in 2019 and 2020. The total pre-based year rate adjustment revenue projected for 2022, including a
9.00% commercial rate increase, is 8.08% higher than 2020 reported revenues. These projected increases in non-residential ratepayer revenues offset the needed amount of residential rate revenue adjustment.
Original 2022 Adjustment Adjusted 2022
Direct Labor $7,893,950 $0 $7,893,950
Tipping Fees (Profit Allowed up to $51 a ton) $5,004,175 -$363,940 $4,640,235 Corporate Overhead $520,852 -$9,107 $511,745
Office Salaries $2,786,123 $0 $2,786,123
Other General and Admin Costs $1,677,489 $60,363 $1,737,852 Total 17,882,590$ -$312,685 $17,569,905
Total $1,986,954 -$34,743 $1,952,212
Trucking Charges $14,269,163 $0 $14,269,163
Regulatory Fees $50,000 $0 $50,000
Tipping Fees (Pass Through) $6,896,067 -$762,171 $6,133,895 Residential and Commercial Franchise Fee $6,412,075 -$121,581 $6,290,494 Total $27,627,304 -$883,752 $26,743,552
Total $0 $330,580 $330,580
47,496,848$ -$900,600 $46,596,249Revenue Requirem ent* Allowable Costs
Operating Profit
Pass-Through Costs
Additional Debrix Box Costs
Table 1: Adjustments to MDRR's Rate Application
Review of Rate Application
City of Concord | Base Year Rate Adjustment 9 of 14 Assessment
MDRR provided actual total revenues for years 2019 and 2020 in support of its projected revenues.
MDRR projects continued increases in number of accounts serviced and revenue. We assessed the reasonableness of MDRR’s projected residential and commercial revenues and based on our assessment we found MDRR’s revenue projections to be reasonable.
Adjustments
No adjustments.
3. RATE ADJUSTMENT IMPLEMENTATION
City of Concord | Base Year Rate Adjustment 10 of 14 In past practice, the base rate adjustment would go into full effect in the base rate year, with subsequent years (until the next base rate adjustment) being subject to rate adjustments via the RRI as outlined in the City’s franchise agreement. This base year, however, includes costs that are larger than historical requests due to implementing SB 1383 and maintaining satisfactory operations, and as such MDRR has proposed an alternative rate adjustment schedule that phases in the base adjustment over five (5) years.
MDRR presented this alternate as an option to spread out adjustment over several years, which is a common strategy particularly when facing a large rate increase not unlike the City’s situation. A common reason for phasing in a rate adjustment is to reduce negative perception by reducing the immediate impact on ratepayers. Phasing in a large rate increase over time tends to reduce negative public perception and stabilizes customer subscription migration.
Tables 2-5 below show four (4) scenarios outlining the rate differences in the adjustment methodologies between a one-time base year rate increase and different phased-in approaches. The phased-in rates in each scenario were designed based on the following criteria:
》 Scenario 1: Large increase in the first year (14.00%), followed by minimal adjustments (3.22%) plus projected RRI increase in the following years.
》 Scenario 2: Minimal increase in the first year (3.00%) followed by equivalent adjustments (8.34%) plus the projected RRI increase in the following years. 》 Scenario 3: Base year rate adjustment is evenly spread across rate years at 6.60%, plus the projected RRI increase in the following years.
》 Scenario 4: Total annual adjustments (base year phase-in plus projected RRI) are equivalent across all rate years at approximately 9.76% (depending on actual RRI values).
For each of these scenarios, the total 5-year projected revenue generation is approximately equal at $105.9 million in total from 2022 through 2026, and inclusive of an assumed 5.15% RRI in 2023 and 2024 (inclusive of the Disposal Fee adjustments noted in this report) and 3.5% in 2025 and 2026. As noted elsewhere in this report, the actual RRI values in future years may be higher as a result of inflation; for the purpose of this analysis we used the historical ~3.5% RRI value.
Scenario 1
As shown in Table 2, total five year revenue generation potential for a one-time increase in 2022 vs. a five-year phased-in increase is nearly identical. In a one-time rate increase, the City’s residential ratepayers would see an increase of 21.55% in 2022, followed by the normal projected RRI indexed rate adjustment methodology in the following years. Years 2023 and 2024 have higher projected RRI projections associated with the known tip fee increases at MDRR’s facility in the City of Pittsburg in those years.
Annual Revenue
Projected
Annual Revenue
Projected
One
Increase Projected RRI Projected
Increase 15,885,039$
Phased
Increase
Projected
RRI
Projected
Increase 15,885,039$
2022 21.55% 0. 00% 21.55% 19,308,821 14.00% 0.00% 14.00% 18,108,945 2023 5.15% 5.15% 20,303,225 3.22% 5.15% 8.37% 19,624,664 2024 5.15% 5.15% 21,348,841 3.22% 5.15% 8.37% 21,267,248 2025 3.50% 3.50% 22,096,051 3.22% 3.50% 6.72% 22,696,407 2026 3.50% 3.50% 22,869,412 3.22% 3.50% 6.72% 24,221,606 Total 21.55% 17.30% 38.85% 105,926,351 26.88% 17.30% 44.18% 105,918,869 One-Time Increase Phase-in Increase
Year
Table 2: Scenario 1 - One-Time Adjustment vs. Five-Year Phased Adjusment
Rate Adjustment Implementation
City of Concord | Base Year Rate Adjustment 11 of 14
As shown in Table 2 on the prior page, in the Scenario 1 phased-in approach, the City’s residential ratepayers would see a 14.00% increase in 2022, followed by annual increases of 3.22% plus the RRI adjustment (again, shown at an assumed 3.50% based on historical trends, but which will vary according to the annual RRI calculation).
Scenario 2
As shown in Table 3, Scenario 2 of the phased-in approach, the City’s residential ratepayers would see a minimal 3.00% increase in 2022, followed by annual increases of 8.34% plus the RRI adjustment.
Scenario 3
As shown in Table 4, Scenario 3 of the phased-in approach, the City’s residential ratepayers would see equal annual rate increases of 6.60%, plus the RRI adjustment.
Annual Revenue
Projected
Annual Revenue
Projected
One
Increase Projected RRI Projected
Increase 15,885,039$
Phased
Increase
Projected
RRI
Projected
Increase 15,885,039$
2022 21.55% 0.
00% 21.55% 19,308,821 3.00% 0.00% 3.00% 16,361,591 2023 5.15% 5.15% 20,303,225 8.34% 5.15% 13.49% 18,568,769 2024 5.15% 5.15% 21,348,841 8.34% 5.15% 13.49% 21,073,696 2025 3.50% 3.50% 22,096,051 8.34% 3.50% 11.84% 23,568,822 2026 3.50% 3.50% 22,869,412 8.34% 3.50% 11.84% 26,359,370 Total 21.55% 17.30% 38.85% 105,926,351 36.36% 17.30% 53.66% 105,932,248 Year
One-Time Increase Phase-in Increase
Annual Revenue
Projected
Annual Revenue
Projected
One
Increase
Projected
RRI
Projected
Increase 15,885,039$
Phased
Increase
Projected
RRI
Projected
Increase 15,885,039$
2022 21.55% 0.00% 21.55% 19,308,821 6.60% 0.00% 6.60% 16,933,452 2023 5.15% 5.15% 20,303,225 6.60% 5.15% 11.75% 18,923,133 2024 5.15% 5.15% 21,348,841 6.60% 5.15% 11.75% 21,146,601 2025 3.50% 3.50% 22,096,051 6.60% 3.50% 10.10% 23,282,407 2026 3.50% 3.50% 22,869,412 6.60% 3.50% 10.10% 25,633,930 Total 21.55% 17.30% 38.85% 105,926,351 33.00% 17.30% 50.30% 105,919,523 Year
One-Time Increase Phase-in Increase
Table 4: Scenario 3 - One-Time Adjustment vs. Five-Year Phased Adjusment Table 3: Scenario 2 - One-Time Adjustment vs. Five-Year Phased Adjusment
Rate Adjustment Implementation
City of Concord | Base Year Rate Adjustment 12 of 14 Scenario 4
As shown in Table 5, Scenario 4 of the phased-in approach, the City’s residential ratepayers would see a total increase (base-year adjustment plus RRI adjustment) of approximately 9.76% each of the five (5) rate years.
Another aspect to consider in these scenarios is the projected rates after this 5-year period. In terms of the phased-in approaches, Scenario 1 would result in the lowest total projected customer rates compared to the other scenarios. Scenario 2 would result in the highest total projected customer rates.
One-Time Base Year Rate Adjustment
Benefits
》 At the end of five years, the monthly customer rate will be lower than in taking a phased-in approach.
》 Simpler to implement and track.
Drawbacks
》 Large rate increase occurring in a single year.
》 Possible negative ratepayer perception and stronger opposition compared to a phased-in approach.
》 May lead to abnormal subscription migration.
Five-Year Phase-In of Base Year Rate Adjustment
Benefits
》 Less likely to lead to abnormal subscription migration. 》 Likely less negative ratepayer perception and less opposition compared to a one-time increase.
Drawbacks
At the end of five years, the monthly customer rate will be higher than if implementing a one-time increase.
Annual Revenue
Projected
Annual Revenue
Projected
One
Increase
Projected
RRI
Projected
Increase 15,885,039$
Phased
Increase
Projected
RRI
Projected
Increase 15,885,039$
2022 21.55% 0.00% 21.55% 19,308,821 9.76% 0.00% 9.76% 17,435,419 2023 5.15% 5.15% 20,303,225 4.61% 5.15% 9.76% 19,137,116 2024 5.15% 5.15% 21,348,841 4.61% 5.15% 9.76% 21,004,899 2025 3.50% 3.50% 22,096,051 6.26% 3.50% 9.76% 23,054,977 2026 3.50% 3.50% 22,869,412 6.26% 3.50% 9.76% 25,305,142 Total 21.55% 17.30% 38.85% 105,926,351 31.50% 17.30% 48.80% 105,937,553 One-Time Increase Phase-in Increase
Year
Table 5: Scenario 4 - One-Time Adjustment vs. Five-Year Phased Adjusment
4. COMPARISON OF RATES
City of Concord | Base Year Rate Adjustment 13 of 14 When setting new solid waste rates it is good practice to survey the rates of nearby communities to obtain perspective on the industry average. The City’s rates remain competitive among the surveyed jurisdictions below.
As shown in Table 6 below, the City’s current 32-gallon rate is approximately 13% lower than the surveyed average. The 32-gallon container is projected to have approximately 39% of the City’s customers subscribed to this level of service. The 64-gallon rate is ~30% lower than the surveyed average accounting for roughly 34% of the City’s customer base, and the 96-gallon residential rate is ~41% lower than the surveyed average with 24% of the City’s customers subscribing. The 96-gallon container is the least popular option among residential customers, however it is significantly lower in cost than nearby communities. The remaining 3% of City customers are projected to have low income senior citizen rates.
As for a phased-in approach, each of the four (4) scenarios are included in the table. The rate shown for year scenario is associated only with the year one increase. These phased-in rates for 2022 (year one) compare even more favorably to the average.
Table 6: Residential Solid Waste Rate Survey
Differences in rates between jurisdictions are the result of multiple different factors including differences in levels of service offerings. Nevertheless, one factor that helps to explain the City’s rate differences is the types of rate structures used among communities. Several surveyed communities have nearly directly linear rate structures, in which the cost of the container is directly proportional to the size. For each incremental increase in disposal capacity, customers pay an equally associated increase in price, which is known as a “Pay-As-You-Throw” (PAYT) rate structure. This type of rate structure typically results in lower rates for the smallest cart and higher rates for the largest cart when compared to rates in other jurisdictions. Additionally, jurisdictions are implementing SB 1383 on different schedules which affects the rates in each jurisdiction differently depending on when programs were implemented. Furthermore, some jurisdictions implemented SB 1383 while negotiating new contracts with haulers, which may have provided unseen benefits to those jurisdictions and the respective rates.
Jurisdiction 32 Gallon 64 Gallon 96 Gallon
Orinda $54.50 $102.23 $153.46
Kensington $49.04 $98.03 $147.07
Richmond $45.20 $85.29 $126.59
Hercules $41.67 $73.61 $106.56
Lafayette $38.94 $73.47 $110.19
San Ramon $42.05 $72.54 $115.53
Pinole $40.63 $72.47 $105.43
San Pablo $35.06 $67.87 $101.73
Concord (MDRR Proposed One-Time) $44.67 $60.39 $74.05
Oakley $41.69 $58.29 $66.13
Concord (R3 Adjusted) One-Time $42.71 $57.75 $70.82
Pittsburg $46.38 $55.89 $62.75
Danville $32.55 $55.36 $82.19
Concord (R3 Adjusted) Scenario 1 - Year 1 $40.06 $54.16 $66.42 Concord (R3 Adjusted) Scenario 4 - Year 1 $38.57 $52.15 $63.95 Antioch $31.92 $51.52 $60.51
Concord (R3 Adjusted) Scenario 3 - Year 1 $37.46 $50.65 $62.11 Walnut Creek $26.74 $50.51 $75.43
Concord (R3 Adjusted) Scenario 2 - Year 1 $36.19 $48.94 $60.01 Martinez $38.80 $47.68 $90.84
Concord (Current) $35.14 $47.51 $58.26
Pleasant Hill $31.66 $42.77 $63.61
Average without Concord $40.26 $68.05 $99.17
Concord's Current Rates Minus Average -$5.12 -$20.54 -$40.91 % Difference -13% -30% -41%
5. FINDINGS & RECOMMENDATIONS
City of Concord | Base Year Rate Adjustment 14 of 14 Recommended Rate Adjustment
MDRR’s original 2022 Base Year Rate Application calculated a required increase in revenues for 2022 of approximately $4,306,483, which equates to a rate increase of 27.11%. Based on our review we are recommending adjustments that would result in a one-time rate increase of 21.55%. That is based on a revised revenue increase requirement of approximately $3,423,782.
The difference between the adjusted rate adjustment and MDRR’s calculated rate adjustment is due to the following:
》 Reduced the amount of profit-allowed tipping fees by $363,940 to account for profit on up to $51/ton rather than the original $55/ton listed on the original rate application; 》 Reduced corporate overhead by $9,107, which is a result of overall reduction in allowable costs (corporate overhead is limited to 3% of the other allowable cost; 》 Increased other and general administrative costs by $60,363 for the additional cost of a City half- time code enforcement officer;
》 Reduced operating profit by $34,743 resulting from the above adjustments; 》 Reduced pass-through tipping fees by $762,171 as a result of only including one year of tipping fee adjustments (whereas the second and third years of tipping fee increases will be implemented through the RRI process) while reducing the amount of profit-allowed tipping fees as explained above;
》 Adjusted the calculation of franchise fees such that gross revenues include the franchise fees received; and
》 Reduced franchise fees by $121,581 as a result of the above adjustments.
Table 7, below, shows the City’s monthly residential rate impact of the recommended 21.55% rate increase.
Table 6 on the prior page demonstrates the impact to the monthly residential rates via the 5-year phased-in rate adjustment alternatives.
Table 7: Rate Adjustment for Single-Family Customers based on R3's Rate Application Revisions Via One-Time Increase
Service
Level
Current
Rate
Rate
Adjustment
New
Rate
32 gallon $35.14 $7.57 $42.71
64 gallon $47.51 $10.42 $57.75
96 gallon $58.26 $12.56 $70.82
City of Concord
Financial Information
Actual Audited Prior
Year 2019
Current Year
Audited 2020 Projected Base Year 2022
Add'l
Operating
Costs
Incremental Base
Rate Change
CapEx ‐ Phase 1
SEG Shop
Incremental Base
Rate Change
Cost of
Recycling
Incremental Base
Rate Change 1383 Costs
Incremental Base
Rate Change
8. Direct Labor 7,217,995$ 7,553,317$ 7, 810,477$ 7,810,477$ 7,810,477$ ‐ $ 7,810,477$ 83,473 $ 7, 893,950$
9. Tipping Fees (Profit Allowed up to $55 a ton) 5,235,663 5, 004,225 5, 004,175 5, 004,175 5, 004,175 ‐ 5, 004,175 ‐ 5, 004,175
10. Corporate Overhead 492,540 495,461 506,919 506,919 506,919 ‐ 506,919 ‐ 520,852
11. Office Salaries 2,416,571 2, 684,126 2, 786,123 2, 786,123 2, 786,123 ‐ 2, 786,123 ‐ 2, 786,123 12 Other General & Administrative Costs 1,547,754 1, 273,700 1, 296,513 ‐ 1, 296,513 1, 296,513 ‐ 1, 296,513 380,976 1, 677,489
13. Total Operating Costs 16,910,523$ 17,010,828$ 17,404,206.68$ ‐ $ 17,404,206.68$ 17,404,206.68$ ‐$ 17,404,206.68$ 464,449$ 17,882,589.61$
14. Operating Ratio 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0%
15. Allowable Operating Profit 1,878,947$ 1,890,092 1,933,801 ‐ 1,933,801 ‐ 1,933,801 ‐ 1,933,801 51,605 1,986,954
16. Trucking Charges 11,630,163 12,532,772$ 13,383,149$ 743,497$ 14,126,646 ‐$ 14,126,646 ‐$ 14,126,646 142,517$ 14,269,163$
17. Regulatory Fees 50,000 50,000 50,000 50,000 50,000 ‐ 50,000 ‐ 50,000
18. Tipping Fees (Pass Through) 5,040,792 5,101,775 5,379,795 5,379,795 69,982 5,449,777 606,509 6,056,286 839,781 6,896,067
19. Residential and Commercial Franchise Fee 5,356,494 5, 333,957 5, 954,195 116,037 6, 070,232 10,922 6, 081,154 94,657 6, 175,811 233,847 6, 412,075
20. Total Pass Through Costs 22,077,449 23,018,505 24,767,139 859,535 25,626,674 80,904 25,707,577 701,166 26,408,743 1,216,145 27,627,304
21. Total Operating Costs (Line 11) plus Operating Profit 40,866,919$ 41,919,425$ 44,105,146$ 859,535$ 44,964,681$ 80,904$ 45,045,585$ 701,166$ 45,746,751$ 1,732,200$ 47,478,950$ (Line 13) plus Total pass Through Costs (Line 18)
22. Residential Revenue
Current
Rate/Month Months Projected Accounts Total
23. Residential Legacy Mini Can 28.86$ 12 ‐ ‐ $ ‐ $ ‐ $ ‐ $ ‐$ ‐ $ ‐$
24. Residential Legacy Senior Citizen ‐$ 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
25. Residential Low Income Senior Citizen 29.60$ 12 913 324,298 324,298 324,298 ‐ 324,298 ‐ 324,298
26. Residential 32‐Gallon 35.14$ 12 11,499 4, 848,898 4, 848,898 4, 848,898 ‐ 4, 848,898 ‐ 4, 848,898
27. Residential 64‐Gallon 47.51$ 12 10,108 5, 762,773 5, 762,773 5, 762,773 ‐ 5, 762,773 ‐ 5, 762,773
28. Residential 96‐Gallon 58.26$ 12 7,079 4, 949,070 4, 949,070 4, 949,070 ‐ 4, 949,070 ‐ 4, 949,070
29. Residential Revenue Sub‐total 14,922,823 15,768,569 15, 885,039$ 15,885,039$ 15,885,039$ ‐ $ 15,885,039$ ‐ $ 15,885,039$
30. Less: Allowance for Uncollectible Residential Acco ‐ ‐ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 31 Total Residential Revenue (without Rate Change in Base Year) 14,922,823$ 15,768,569$ 15,885,039$ 15,885,039$ 15,885,039$ ‐ $ 15,885,039$ ‐ $ 15,885,039$
32. Commercial Revenue Increase 9.00% 24,913,426 24,033,721 27,155,634$ 27,155,634.05$ 27,155,634.05$ ‐ $ 27,155,634.05$ ‐ $ 27,155,634.05$
33. Less: Allowance for Uncollectible ‐ ‐ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ Commercial Accounts 24,913,426 24,033,721
34. Total Commercial Revenue 24,913,426$ 24,033,721$ 27,155,634$ 27,155,634$ 27,155,634$ ‐ $ 27,155,634$ ‐ $ 27,155,634$
35. Recycled Material Sales 121,081 142,507 131,794$ 131,794$ 131,794$ 131,794$ 131,794$
36. Total Revenue (Lines 31 + 34 + 35) 39,957,329$ 39,944,797$ 43,172,467$ 43,172,467$ 43,172,467$ ‐ $ 43,172,467$ ‐ $ 43,172,467$
37. Net Shortfall (Surplus) 909,589$ 1,974,628$ 932,679$ 859,535$ 1, 792,214$ 80,904 $ 1,873,118$ 701,166$ 2,574,284$ 1,732,200$ 4,306,483$
38. Total Residential Revenue Prior to Rate Change 15,885,039$ 15,885,039$ 15,885,039$ ‐$ 15,885,039$ ‐$ 15,885,039$
39. Percent Change in Existing Residential Rates (Line 37 ÷ 38) 5.87% 5.41% 11.28% 0.51% 11.79% 4.41% 16.21% 10.90% 27.11% Incremental Change
Fiscal Year: 2021 Page 2 of 3
Section VI ‐ Net Shortfall (Surplus)
Section VII ‐ Percent Change in Rates
Base Rate by Category
Section I ‐ Operating Costs
Section II ‐ Allowable Operating Profit
Section III ‐Pass Through Costs
Section IV ‐ Revenue Requirement
Section V ‐ Revenue without Rate Change in Base Year
https://r3cgi.sharepoint.com/Shared Documents/R3 Shared/+Projec ts/Concord FY 21‐22 ‐ 121054/Ratesetting/Rate app 2021/+Report/Attachment 1 ‐ Original 2021 Concord Base Rate ‐ City of Concord & R3 SubmittalPage 2 of 3 ‐ BS Act. 9.0%
City of Concord
133000
Financial Information
Actual Audited Prior
Year 2019
Current Year
Audited 2020 Projected Base Year 2022
Add'l
Operating
Costs
Incremental Base
Rate Change
CapEx ‐ Phase 1
SEG Shop
Incremental Base
Rate Change Cost of Recycling
Incremental Base
Rate Change 1383 Costs Incremental Base Rate Change
8. Direct Labor 7,217,995$ 7,553,317$ 7, 810,477$ 7,810,477$ 7,810,477$ ‐ $ 7,810,477$ 83,473 $ 7, 893,950$
9. Tipping Fees (Profit Allowed up to $51 a ton) 4,854,888 4, 640,281 4, 640,235 4,640,235 4, 640,235 ‐ 4, 640,235 4, 640,235
10. Corporate Overhead 481,116 484,543 496,000 497,811 497,811 ‐ 497,811 511,745
11. Office Salaries 2,416,571 2, 684,126 2, 786,123 2, 786,123 2, 786,123 ‐ 2, 786,123 2, 786,123 12 Other General & Administrative Costs 1,547,754 1, 273,700 1, 296,513 60,363 1,356,876 1, 356,876 ‐ 1, 356,876 380,976$ 1,737,852
13. Total Operating Costs 16,518,324$ 16,635,966$ 17,029,348.48$ 60,362.70$ 17, 091,522.06$ 17,091,522.06$ ‐$ 17,091,522.06$ 464,449$ 17,569,905.00$
14. Operating Ratio 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0% 90.0%
15. Allowable Operating Profit 1,835,369$ 1,848,441 1,892,150 6,707 1,899,058 ‐ 1,899,058 ‐ 1,899,058 51,605 1,952,212
16. Trucking Charges 11,630,163 12,532,772$ 13,383,149$ 743,497$ 14,126,646 ‐$ 14,126,646 ‐$ 14,126,646 142,517$ 14,269,163$
17. Regulatory Fees 50,000 50,000 50,000 50,000 50,000 ‐ 50,000 ‐ 50,000
18. Tipping Fees (Pass Through) 5,421,568 5,465,719 5,628,471 5,628,471 23,327 5,651,799 202,170 5,853,968 279,927 6,133,895
19. Residential and Commercial Franchise Fee 5,356,494 5, 333,957 5, 928,001 126,505 6, 054,506 3,641 6, 058,147 31,552 6, 089,699 146,471 6, 290,494
20. Total Pass Through Costs 22,458,224 23,382,448 24,989,621 870,002 25,859,624 26,968 25,886,592 233,722 26,120,313 568,915 26,743,552 956,537 0.17932969
21. Total Operating Costs (Line 11) plus Operating Profit 40,811,918$ 41,866,855$ 43,911,120$ 937,072$ 44,848,192$ 26,968$ 44,875,159$ 233,722$ 45,108,881$ 1,084,970$ 46,596,249$ (Line 13) plus Total pass Through Costs (Line 18)
22. Residential Revenue
Current
Rate/Month Months Projected Accounts Total
23. Residential Legacy Mini Can 28.86$ 12 ‐ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ ‐$
24. Residential Legacy Senior Citizen ‐$ 12 ‐ 0.030845637 ‐ ‐ ‐ ‐ ‐ ‐ ‐
25. Residential Low Income Senior Citizen 29.60$ 12 913 0.388492854 324,298 324,298 324,298 4,256 328,554 328,554
26. Residential 32‐Gallon 35.14$ 12 11,499 0.341498024 4,848,898 4, 848,898 4, 848,898 47,123 4, 896,021 4, 896,021
27. Residential 64‐Gallon 47.51$ 12 10,108 0.239163485 5,762,773 5, 762,773 5, 762,773 29,010 5, 791,783 5, 791,783
28. Residential 96‐Gallon 58.26$ 12 7,079 4, 949,070 4, 949,070 4, 949,070 ‐ 4, 949,070 4, 949,070
29. Residential Revenue Sub‐total 14,922,823 15,768,569 15, 885,039$ 15,885,039$ 15,885,039$ 80,389 $ 15,965,428$ 15,965,428$
30. Less: Allowance for Uncollectible Residential Acco ‐ ‐ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ 31 Total Residential Revenue (without Rate Change in Base Year) 14,922,823$ 15,768,569$ 15,885,039$ 15,885,039$ 15,885,039$ 80,389 $ 15,885,039$ 15,885,039$
32. Commercial Revenue Increase 9.00% 24,913,426 24,033,721 27,155,634$ 27,155,634.05$ 27,155,634.05$ ‐ $ 27,155,634.05$ ‐ $ 27,155,634.05$
33. Less: Allowance for Uncollectible ‐ ‐ ‐ $ ‐ $ ‐ $ ‐ $ ‐ $ Commercial Accounts 24,913,426 24,033,721
34. Total Commercial Revenue 24,913,426$ 24,033,721$ 27,155,634$ 27,155,634$ 27,155,634$ ‐ $ 27,155,634$ ‐ $ 27,155,634$
35. Recycled Material Sales 121,081 142,507 131,794$ 131,794$ 131,794$ 131,794$ 131,794$
36. Total Revenue (Lines 31 + 34 + 35) 39,957,329$ 39,944,797$ 43,172,467$ 43,172,467$ 43,172,467$ 80,389 $ 43,172,467$ 43,172,467$
37. Net Shortfall (Surplus) 854,588$ 1,922,058$ 738,653$ 937,072$ 1, 675,725$ 26,968 $ 1,702,692$ 153,333$ 1,936,414$ 1,084,970$ 3,423,782 $
38. Total Residential Revenue Prior to Rate Change 15,885,039 $ 15,885,039$ 15,885,039$ 80,389 $ 15,885,039$ ‐ $ 15,885,039$
39. Percent Change in Existing Residential Rates (Line 37 ÷ 38) 4.65% 5.90% 10.55% 0.17% 10.72% 1.47% 12.19% 9.36% 21.55% Incremental Change
Fiscal Year: 2021 Page 2 of 3
Section VI ‐ Net Shortfall (Surplus)
Section VII ‐ Percent Change in Rates
Base Rate by Category
Section I ‐ Operating Costs
Section II ‐ Allowable Operating Profit
Section III ‐Pass Through Costs
Section IV ‐ Revenue Requirement
Section V ‐ Revenue without Rate Change in Base Year
https://r3cgi.sharepoint.com/Shared Documents/R3 Shared/+Projec ts/Concord FY 21‐22 ‐ 121054/Ratesetting/Rate app 2021/+Report/Attachment 2 ‐ 2021 Concord Base Rate ‐ City of Concord & R3 SubmittalPage 2 of 3 ‐ BS Act. 9.0%
2022 32 ‐GAL 64‐GAL *9 6 ‐GAL
Current 35.14 $ 47.51 $ 58.26 $
21.55% One Time 42.71 $ 57.75 $ 70.82 $ One‐Time 7.57 $ 10.24 $ 12.56 $
3.22% Scenario 1 40.06 $ 54.16 $ 66.42 $ Scenario 1 4.92 $ 6.65 $ 8.16 $
3.00% Scenario 2 36.19 $ 48.94 $ 60.01 $ Scenario 2 1.05 $ 1.43 $ 1.75 $
6.60% Scenario 3 37.46 $ 50.65 $ 62.11$ Scenario 3 2.32 $ 3.14 $ 3.85 $
9.76% Scenario 4 38.57 $ 52.15 $ 63.95 $ Scenario 4 3.43 $ 4.64 $ 5.69 $ 2023 32 ‐GAL 64‐GAL 96‐GAL
5.15% One Time 44.91 $ 60.72 $ 74.47 $ One‐Time 2.20 $ 2.97 $ 3.65 $
8.37% Scenario 1 43.41 $ 58.69 $ 71.98 $ Scenario 1 3.35 $ 4.53 $ 5.56 $
13.49% Scenario 2 41.07 $ 55.54$ 68.11 $ Scenario 2 4.88 $ 6.60 $ 8.10 $
11.75% Scenario 3 41.86 $ 56.60 $ 69.41 $ Scenario 3 4.40 $ 5.95 $ 7.30 $
9.76% Scenario 4 42.33 $ 57.24 $ 70.19 $ Scenario 4 3.76 $ 5.09 $ 6.24 $ 2024 32 ‐GAL 64‐GAL 96‐GAL
5.15% One Time 47.22 $ 63.85 $ 78.30 $ One‐Time 2.31 $ 3.13 $ 3.84 $
8.37% Scenario 1 47.05
$ 63.61 $ 78.00 $ Scenario 1 3.63 $ 4.91 $ 6.02 $
13.49% Scenario 2 46.61 $ 63.03 $ 77.29 $ Scenario 2 5.54 $ 7.49 $ 9.19 $
11.75% Scenario 3 46.78 $ 63.25 $ 77.56 $ Scenario 3 4.92 $ 6.65 $ 8.16 $
9.76% Scenario 4 46.47 $ 62.83 $ 77.04 $ Scenario 4 4.13 $ 5.59 $ 6.85 $ 2025 32‐
GAL 64‐GAL 96‐GAL
3.50% One Time 48.88 $ 66.09 $ 81.04 $ One‐Time 1.65 $ 2.23 $ 2.74 $
6.72% Scenario 1 50.21 $ 67.88 $ 83.25 $ Scenario 1 3.16 $ 4.27 $ 5.24 $
11.84% Scenario 2 52.13 $ 70.50 $ 86.44 $ Scenario 2 5.52 $ 7.46 $ 9.15 $
10.10% Scenario 3 51.51 $ 69.64 $ 85.40 $ Scenario 3 4.72 $ 6.39$ 7.83 $
9.76% Scenario 4 51.00 $ 68.96 $ 84.56 $ Scenario 4 4.54 $ 6.13 $ 7.52 $ 2026 32 ‐GAL 64‐GAL 96‐GAL
3.50% One‐Time 50.59 $ 68.40 $ 83.88 $ One‐Time 1.71 $ 2.31 $ 2.84 $
6.72% Scenario 1 53.58 $ 72.44 $ 88.84 $ Scenario 1 3.37 $ 4.56 $ 5.59 $
11.84% Scenario 2 58.30 $ 78.84 $ 96.68 $ Scenario 2 6.17 $ 8.35 $ 10.23 $
10.10% Scenario 3 56.71 $ 76.67 $ 94.02 $ Scenario 3 5.20 $ 7.03 $ 8.63 $
9.76% Scenario 4 55.98 $ 75.69 $ 92.81 $ Scenario 4 4.98 $ 6.73 $ 8.25 $ *Sorted: One‐Time, Scenario 1, 2, 3, 4
INCREASE OVER PRIOR YEAR
Phased in Rate Increase Scenarios by Dollar Amount
INCREASE OVER CURRENT
INCREASE OVER PRIOR YEAR
INCREASE OVER PRIOR YEAR
INCREASE OVER PRIOR YEAR
Attachment 4
2022 32 ‐GAL 64‐GAL 96‐GAL
Current 35.14 $ 47.51 $ 58.26 $
21.55% One Time 42.71 $ 57.75 $ 70.82 $ One‐Time 7.57 $ 10.24 $ 12.56 $
14.00% Scenario 1 40.06 $ 54.16 $ 66.42 $ Scenario 1 4.92 $ 6.65 $ 8.16 $
3.00% Scenario 2 36.19 $ 48.94 $ 60.01 $ Scenario 2 1.05 $ 1.43 $ 1.75 $
6.60% Scenario 3 37.46 $ 50.65 $ 62.11 $ Scenario 3 2.32 $ 3.14 $ 3.85 $
9.76% Scenario 4 38.57 $ 52.15 $ 63.95 $ Scenario 4 3.43 $ 4.64 $ 5.69 $ 2023 32 ‐GAL 64‐GAL 96‐GAL
5.15% One Time 44.91 $ 60.72 $ 74.47 $ One‐Time 2.20 $ 2.97 $ 3.65 $
8.37% Scenario 1 43.41 $ 58.69 $ 71.98 $ Scenario 1 3.35 $ 4.53 $ 5.56 $
13.49% Scenario 2 41.07 $ 55.54$ 68.11 $ Scenario 2 4.88 $ 6.60 $ 8.10 $
11.75% Scenario 3 41.86 $ 56.60 $ 69.41 $ Scenario 3 4.40 $ 5.95 $ 7.30 $
9.76% Scenario 4 42.33 $ 57.24 $ 70.19 $ Scenario 4 3.76 $ 5.09 $ 6.24 $ 2024 32 ‐GAL 64‐GAL 96‐GAL
5.15% One Time 47.22 $ 63.85 $ 78.30 $ One‐Time 2.31 $ 3.13 $ 3.84 $
8.37% Scenario 1 47.05
$ 63.61 $ 78.00 $ Scenario 1 3.63 $ 4.91 $ 6.02 $
13.49% Scenario 2 46.61 $ 63.03 $ 77.29 $ Scenario 2 5.54 $ 7.49 $ 9.19 $
11.75% Scenario 3 46.78 $ 63.25 $ 77.56 $ Scenario 3 4.92 $ 6.65 $ 8.16 $
9.76% Scenario 4 46.47 $ 62.83 $ 77.04 $ Scenario 4 4.13 $ 5.59 $ 6.85 $ 2025 32‐GAL
64‐GAL 96‐GAL
3.50% One Time 48.88 $ 66.09 $ 81.04 $ One‐Time 1.65 $ 2.23 $ 2.74 $
6.72% Scenario 1 50.21 $ 67.88 $ 83.25 $ Scenario 1 3.16 $ 4.27 $ 5.24 $
11.84% Scenario 2 52.13 $ 70.50 $ 86.44 $ Scenario 2 5.52 $ 7.46 $ 9.15 $
10.10% Scenario 3 51.51 $ 69.64 $ 85.40 $ Scenario 3 4.72 $ 6.39 $ 7.83$
9.76% Scenario 4 51.00 $ 68.96 $ 84.56 $ Scenario 4 4.54 $ 6.13 $ 7.52 $ 2026 32 ‐GAL 64‐GAL 96‐GAL
3.50% One‐Time 50.59 $ 68.40 $ 83.88 $ One‐Time 1.71 $ 2.31 $ 2.84 $
6.72% Scenario 1 53.58 $ 72.44 $ 88.84 $ Scenario 1 3.37 $ 4.56 $ 5.59 $
11.84% Scenario 2 58.30 $ 78.84 $ 96.68 $ Scenario 2 6.17 $ 8.35$ 10.23 $
10.10% Scenario 3 56.71 $ 76.67 $ 94.02 $ Scenario 3 5.20 $ 7.03 $ 8.63 $
9.76% Scenario 4 55.98 $ 75.69 $ 92.81 $ Scenario 4 4.98 $ 6.73 $ 8.25 $ INCREASE OVER PRIOR YEAR
Phased in Rate Increase Scenarios by Dollar Amount
INCREASE OVER CURRENT
INCREASE OVER PRIOR YEAR
INCREASE OVER PRIOR YEAR
INCREASE OVER PRIOR YEAR
Agenda Item No. 6.a
Benched Attachment 4
May 3, 2022
Master Fee Schedule
Amendments
KYLIE HICKS, BUDGET ANALYST
MAY 3, 2022
CITY COUNCIL MEETING
Presentation Agenda
Background
Brief overview of recommended fee increases
Presentation on options for base rate Sanitation
and
Refuse Fee increase
Requested action from Council
2
Background
Policy and Procedure 170 – F ee Setting Policy
Sets cost recovery goals
Provides policy guidelines for setting and updating
f
ees and charges
Generally, fees to be adjusted by changes in labor
c
osts
3
Summary of Proposed Changes
Proposed fee adjustments are driven by the following:
Department recommendations
Incorporate wage adjustments
Operational costs
Cost recovery
4
Proposed Fee Adjustments
Recommended General Fund fee adjus tments
• Could recover additional $146, 000 in FY 2022-23
Proposed Amendments to Fee Schedule
• Attachment 1, Exhibit A
Effective July 1, 2022
5
Sanitation and Refuse Fees
Sanitation and Refuse Fees – Se lect and approve an option for phased-in rate increase.
Public Works staff and consultants from R3 will share further in
formation
6
Refuse and Sanitation
•Solid Waste: i ncludes garbage, recyclables, organic
materials, construction and demolition debris, and drop box services
•SB 1383: S hort-Lived Climate pollutants
•Rate increase scenarios
7
Concord City Council
2022 Base Year Rate
Adjustment
GARTH SCHULTZ, PRINCIPAL R3 CONSULTING GROUP
MAY 3, 2022
8
AGENDA
1. Rate Adjustment Background
2. Rate Review Outcomes
3. Factors Affecting Rate Increases
4. Comparison to Other Communities
5. 5-Year Rate Adjustment Options
9
10 •Base Year Rate Adjustment
◦ Base Year rate adjustment was last completed in 2016
◦ Expenses for the coming rate year are projected based on actual expenses in prior years plus projected changes
◦ Revenues prior to rate adjustments are based on current rates and subscription levels
◦ The difference between projected expenses and projected revenues at current rates yields a revenue shortfall (or surplus) ◦ Shortfall divided by current revenues yields percentage increase
11 •Unique Circumstances Related to COVID-19
◦ There was a significant increase in unpaid accounts across residential, multi-family, commercial, & roll off revenue (~$1 million / 1,436 accounts)
◦ Although allowed by the Rate Manual, un-collected revenue is not in MDRR’s Base Year rate request
◦ MDRR did not apply for Refuse Rate Index (RRI) and held rates flat
◦ MDRR’s Base Year rate request uses pre-pandemic commercial revenue numbers thus helping to lower the overall residential revenue requirement
Rate Review Outcomes
•Adjusted Base Year Rate Adjustment
◦ Recommended one-t ime increase of 21.55%
◦ Findings reviewed and agreed to by MDRR
◦ Adjustments included:
◦ Funding for City enforcement staffing (for SB 1383 and other solid waste c
ompliance matters)
◦ Funding for full usage of allotted clean-u p services to the City ◦ Phasing-i n of government approved increases in tipping expenses (for SB 1383 compliance, capital improvements, recycling)
◦ Reductions to corporate overhead costs
◦ Reductions to profit and franchise fees resulting from all other adjustments 12
Factors Affecting Rate Increases
•21.55% rate increase includes:
◦ 1.47% t o replace prior temporary recycling
surcharge
◦ 2.08% f und full allotment of City clean -up
services (any unused services will result in a credit in future rate years)
◦ 4.65% f or changing operating expenses,
and reflective of no rate adjustment since
2019
•Unfunded State Mandates (13.35%)
◦ 0.49% t o fund City enforcement position
(SB 1383 and other solid waste compliance matters)
◦ 5.58% f or compliance with California Air
Resource Board (CARB)
◦ 7.28% f
or SB 1383 implementation,
including
◦ New transfer station infrastructure and
c
omposting costs
◦ Additional organics collection routes
◦ New color- compliant carts, lids and labels
◦ New residential and multi- family food scrap
pails
◦ New outreach and education activities
◦ Contamination audits and others new
se
rvices
13
14 13.35%
1.47%
2.08%
4.65%
Unfunded Mandates Recycling Markets
City Clean-up Events Other Cost Increases
Impact of Unfunded Mandate
Comparison to Other Communities
•R3 compared Concord’s current rates to other cities
◦ Antioch, Danville, Hercules, Kensington, Lafayette, Martinez, Orinda, Oakley, P
inole, Pittsburg, Pleasant Hill, Richmond, San Pablo, San Ramon and Walnut Creek
•Concord’s current residential rates are well below average ◦ 32-g allon monthly rate is ~$5.50 or 14% below average (39% of customers) ◦ 64-g allon monthly rate is ~$21.00 or 31% below average (34% of customers) ◦ 96-g allon monthly rate is ~$41.50 or 42% below average (24% of customers) •Concord’s 2022 residential rates via any 5- year Option will remain below current averages
•Commercial rates are not regulated by City but also are below average 15
16 $54.16 $52.15
$50.65 $48.94 $47.51
$68.55
0 20
40 60
80 100
64-Gallon Residential Monthly Rates – Year 1
5-Year Rate Adjustment Options
17 •MDRR is willing to implement the rate
adjustment over 5 years
◦ Years 2 through 5 are in addition to the annual Indexed “RRI” Rate Adjustments
◦ RRI has historically been ~3.5% but will likely be higher in future years due to inflation and increases in tipping fees due to SB 1383 infrastructure improvements
◦ RRI capped at 7% per Rate Manual
18 One-Time Rate
•2023-2 026 rates adjusted by RRI
•Staff developed four alternative
scenarios to reduce the up-front
impact to rate payers
•Each scenario phases in the
$10.24/month one-time rate
increase over five years (plus
estimated annual RRI increase)
$10.24
$3.00 $3.10
$2.20 $2.30
$-
$2.00
$4.00
$6.00
$8.00
$10.00
$12.00
2022 2023 2024 2025 2026
One-Time
19 Est. Rate Increase over Prior Year by Scenario
(64-gallon Container)
$6.65
$4.53 $4.91
$4.27 $4.56
$-
$1.00
$2.00
$3.00
$4.00
$5.00
$6.00
$7.00
2022 2023 2024 2025 2026
Scenario 1
$1.43
$6.60
$7.49 $7.46
$8.35
$-
$1.00
$2.00
$3.00
$4.00
$5.00
$6.00
$7.00
$8.00
$9.00
2022 2023 2024 2025 2026
Scenario 2
20 Est. Rate Increase over Prior Year by Scenario
(64-gallon Container)
$3.14
$5.95
$6.65 $6.39
$7.03
$-
$1.00
$2.00
$3.00
$4.00
$5.00
$6.00
$7.00
$8.00
2022 2023 2024 2025 2026
Scenario 3
$4.64 $5.10
$5.60
$6.10
$6.70
$-
$1.00
$2.00
$3.00
$4.00
$5.00
$6.00
$7.00
$8.00
2022 2023 2024 2025 2026
Scenario 4
21 Est. 64-gal Rates by Scenario by Year
$-
$10
$20
$30
$40
$50
$60
$70
$80
2021 2022 2023 2024 2025 2026
One-Time Scenario 1 Scenario 2 Scenario 3 Scenario 4 Current Average
Recommended Action
Open Public Hearing
Take Public Testimony on Proposed Fees and Charges
Close Public Hearing
Council Selection of a Sanitation and Refuse Fee Option Adopt Resolution A mending Exhibit A to Resolution No. 78-6042
22
23 Option Current rate One-Time
Increase
Base Rate
Option 1
Base Rate
Option 2
Base Rate
Option 3
Base Rate
Option 4
Percentage 21.55% 14% 3% 6.60% 9.76%
Single Family
96 gallon
58.26 70.82 66.42 60.01 62.11 63.95
64 gallon 47.51 57.75 54.16 48.94 50.65 52.15
32 gallon 35.14 42.71 40.06 36.19 37.46 38.57
20 gallon 28.86 35.08 32.90 29.73 30.76 31.68
Condo/Townhouse (No yard waste)
96 gallon
57.20 69.53 65.21 58.92 60.98 62.78
64 gallon 46.46 56.47 52.96 47.85 49.53 50.99
32 gallon 34.08 41.42 38.85 35.10 36.33 37.41
Each additional
yard waste
container
11.96 14.54 13.63 12.32 12.75 13.13
Low income
Senior
29.60 35.98 33.74 30.49 31.55 32.49
Questions?
24
7.a
Staff Report
Date: May 3, 2022
To: City Council
From: Valerie J. Barone, City Manager
Prepared by: Valerie J. Barone, City Manager
[email protected]
(925) 671-3150
Subject: Considering the formation of a Council Ad Hoc Committee to develop recommendations for full Council review on the
American Recovery Plan Act (ARPA) Investment Plan—
specifically on spending categories, dollar allocations to spending categories, and process for allocating funds within each spending category; the Committee will exist until
recommendations are made to the full Council or the end of calendar year 2022, whichever comes first.
CEQA: Not a project/exempt pursuant to Public Resources Code Section 21065, CEQA Guidelines Sections 15060(c),
15061(b)(3), 15262, and/or 15378.
Report in Brief
The Council, at its meeting of April 26, 2022, directed staff to schedule the creation of an ad-hoc committee to support the development of an American Recovery Act Plan (ARPA) Investment Plan on the next available Council meeting of May 3, 2022.
Recommended Action
That the Mayor appoint two Councilmembers to serve on a Council Ad Hoc Committee until recommendations are forwarded to the full Council or December 31, 2022, whichever comes first, to make recommendations to the full Council on the ARPA Investment Plan, specifically including: spending categories, dollar allocations to spending categories, and process for allocating funds within each spending category.
City Council Agenda Report
Agenda Item No. 8.a
May 3, 2022
Background
Ad Hoc Committees
Pursuant to City of Concord – City Council Meeting Procedures Section 4.53.d, the Mayor may, from time to time, announce appointments to ad hoc advisory committees composed solely of less than a majority of the members of the City Council; the announcement of such appointments shall appear on the posted agenda, but shall not require approval from a majority of the City Council.
The use of Ad Hoc committees is permitted under the Brown Act so long as they:
Serve a limited or single purpose that is not perpetual; Are comprised solely of less than a quorum of the City Council (for a five member Council as in Concord, that means two Councilmembers.); Have a defined purpose and timeframe to accomplish that purpose; Dissolve once the specific task is complete or the time has expired; and Are advisory.
An Ad Hoc committee is not subject to notice and posting requirements, nor to holding public meetings, if the above requirements are followed.
Analysis
The proposed Ad Hoc committee meets all the requirements of City Council meeting procedures Section 4.53.d.
Financial Impact
Creation of the Ad Hoc Committee has no financial impact; however, matters discussed may result in City Manager actions or recommendations to the City Council that have a monetary effect.
Environmental Determination
Pursuant to Public Resources Code Section 21065, CEQA Guidelines Sections 15060(c), 15061(b)(3), 15262), and/or 15378, City Council action on this item is not subject to environmental review under the California Environmental Quality Act (CEQA) of 1970, as amended, because it will not result in a direct or reasonably foreseeable indirect physical change in the environment, and falls within the “common sense” exemption set forth in CEQA Guidelines Section 15061(b)(3), excluding projects where “it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment.”
Public Contact
The City Council Agenda was posted.