ORANGE\DDERLETH\55191.2 PTEAM 03102022
CITY OF CORONA
FIRST AMENDMENT TO
MAINTENANCE/GENERAL SERVICES AGREEMENT
WITH AUGUSTINE GENERAL ENGINEERING, A PARTNERSHIP
((ON-CALL / EMERGENCY – ESSENTIAL SYSTEMS REPAIR SERVICES FOR POTABLE WATER – RECLAIMED WATER - WASTEWATER – RFP 21-057RH)
1. PARTIES AND DATE.
This First Amendment to the Maintenance/General Services Agreement (“First Amendment”) is made and entered into this 2nd day of February, 2022 by and between the City of Corona (“City”) and Augustine General Engineering, a California general partnership (“Contractor”). City and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this First Amendment.
2. RECITALS.
2.1 Agreement. City and Contractor entered into that certain Maintenance/General Services Agreement dated June 16, 2021 (“Agreement”), whereby Contractor agreed to provide On-Call / Emergency – Essential Systems Repair Services for Potable Water – Reclaimed Water – Wastewater.
2.2 Call-Out Services – Prado Dam Spillway Project. Pursuant to the terms of the Agreement, City has identified certain work to assign to Contractor associated with installing manhole covers, raising and extending air vacs and construction of lift station concrete curbing for the Prado Dam Spillway Project (“Utility Retrofit Work”). The Utility Retrofit Work is to be funded with monies obtained by the City pursuant to the Reimbursement Agreement, entered into between the City and the Orange County Flood Control District on or about January 11, 2022.
2.3 Amendment. City and Contractor desire to amend the Agreement for the first time to (1) ensure that the Utility Retrofit Work is performed pursuant to all required provisions of the Reimbursement Agreement; and (2) increase the compensation by $175,860 for fiscal year ending June 30, 2022, in exchange for Contractor performing the Utility Retrofit Work.
3. TERMS.
3.1 Utility Retrofit Work. The Parties agree that the Utility Retrofit Work described in Exhibit “D” attached hereto and incorporated herein by reference is hereby assigned to Contractor pursuant to the terms of the Agreement. Contractor shall be entitled, also pursuant to the terms of the Agreement, to the compensation set forth in Exhibit “D” in exchange for performing the Utility Retrofit Work.
3.2 Reimbursement Agreement Provisions. Contractor shall perform all such Utility Retrofit Work in conformance with all applicable requirements of the Reimbursement Agreement attached hereto as Exhibit “E” and incorporated herein by reference. Contractor DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA 2 (BB&K: 9-10)
ORANGE\DDERLETH\55191.2 PTEAM 03102022
expressly agrees that the compensation for the Retrofit Work set forth in Exhibit “D” shall include all costs associated with compliance with the Reimbursement Agreement requirements.
While it shall be Contractor’s sole responsibility to research and ensure compliance with all requirements of the Reimbursement Agreement, for reference purposes only such requirements shall include, but are not limited to:
3.2.1 Federal and State Prevailing Wage. Contractor and its subcontractors shall comply with the higher of the state or federal prevailing wage rates for workers performing work on federally funded or assisted construction contracts covered by the Davis-Bacon Act.
3.2.2 Davis-Bacon Act. The requirements set forth in the Davis-Bacon Act, 40 U.S.C. 3141 et seq, are incorporated herein by this reference. For covered contracts in excess of $2,000 for the construction, alteration or repair of public buildings and public works, such requirements include, but are not limited to requiring Contractor and its subcontractors to pay their laborers and mechanics employed under contract no less than the locally prevailing wages and fringe benefits for corresponding work on similar projects in the area set forth in the Department of Labor Federal Wage Determination in Exhibit “F” attached hereto and incorporated herein by reference. Contractors and subcontractors are required to pay all mechanics and laborers employed directly on the site of work, unconditionally not less than once per week.
3.2.3 Contract Work Hours and Safety Standards Act. The requirements set forth in the Contract Work Hours and Safety Standards Act, 40 U.S.C. 3701 et seq. are incorporated herein by this reference. Such requirements include, but are not limited to, (1) for covered contracts in excess of $100,000 Contractor and its subcontractors must pay laborers and mechanics, including guards and watchmen, at least one and one-half times their regular rate of pay for all hours worked in excess of 40 in a week; (2) Contractor shall post in a prominent and accessible place at the work site the Davis-Bacon employee rights poster, form WH1321 Rev 10/17; (3) provide weekly statement of wages and fringe benefits statements paid to each employee engaged in covered work; and (4) maintain payroll records for each covered worker for a minimum of three years.
3.2.4 Copeland Anti-Kickback Act. The requirements set forth in the Copeland Anti-Kickback Act, 18 U.S.C. 874 and 40 U.S.C. 3145 are incorporated herein by this reference.
For covered contracts in excess of $2,000, such requirements include, but are not limited to, (1) prohibiting Contractor and its subcontractors performing work from any way inducing an employee to give up any part of the compensation to which he or she is entitled; and (2) Contractors and subcontractors paying their employees on a weekly basis and submitting payroll reports of the wages paid to their laborers and mechanics, during the preceding payroll period.
Each payroll submitted shall be accompanied by a Statement of Compliance signed by the Contractor or subcontractor.
3.2.5 Reporting Requirements. Upon execution of this Agreement and until three years following final disbursement, Contractor and its subcontractors shall maintain records pertaining to this Agreement for each covered worker and make available for inspection to the City upon request.
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA 3 (BB&K: 9-10)
ORANGE\DDERLETH\55191.2 PTEAM 03102022
3.3 Rates & Total Compensation. Section 3.3.1 (Rates & Total Compensation) of the Agreement is hereby deleted in its entirety and replaced with the following:
“3.3.1 Rates & Total Compensation. Contractor shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit “C” attached hereto and incorporated herein by reference.
The total compensation, including authorized reimbursements, shall not exceed Three Hundred Seventy-five Thousand Eight Hundred Sixty Dollars ($375,860.00) per fiscal year ending June 30, 2022 and Two Hundred Thousand Dollars ($200,000.00) per fiscal year ending June 30, 2023 (“Total Compensation”), without written approval of City’s Representative. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement.”
3.4 Continuing Effect of Agreement. Except as amended by this First Amendment, all provisions of the Agreement shall remain unchanged and in full force and effect.
From and after the date of this First Amendment, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement as amended by this First Amendment.
3.5 Adequate Consideration. The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this First Amendment.
3.6 Counterparts. This First Amendment may be executed in duplicate originals, each of which is deemed to be an original, but when taken together shall constitute but one and the same instrument.
[SIGNATURES ON FOLLOWING PAGE]
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA 4 (BB&K: 9-10)
ORANGE\DDERLETH\55191.2 PTEAM 03102022
CITY’S SIGNATURE PAGE
FOR
FIRST AMENDMENT TO
MAINTENANCE/GENERAL SERVICES AGREEMENT
WITH AUGUSTINE GENERAL ENGINEERING, A PARTNERSHIP
((ON-CALL / EMERGENCY – ESSENTIAL SYSTEMS REPAIR SERVICES FOR POTABLE WATER – RECLAIMED WATER - WASTEWATER – RFP 21-057RH) IN WITNESS WHEREOF, the Parties have entered into this First Amendment to Maintenance/General Services Agreement as of the date noted on the first page of the Amendment.
CITY OF CORONA
By: _________________________
Tom Moody
Director of Utilities
Reviewed By: _________________________
Savat Khamphou
Public Works Director/City Engineer
Reviewed By: _________________________
Vernon R. Weisman, P.E.
District Engineer
Reviewed By: _________________________
Scott Briggs
Purchasing Specialist V
Attest:
_________________________
Sylvia Edwards, City Clerk
City of Corona, California
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA ORANGE\DDERLETH\55191.2 PTEAM 03102022
CONTRACTOR’S SIGNATURE PAGE
FOR
FIRST AMENDMENT TO
MAINTENANCE/GENERAL SERVICES AGREEMENT
WITH AUGUSTINE GENERAL ENGINEERING, A PARTNERSHIP
((ON-CALL / EMERGENCY – ESSENTIAL SYSTEMS REPAIR SERVICES FOR POTABLE WATER – RECLAIMED WATER - WASTEWATER – RFP 21-057RH) IN WITNESS WHEREOF, the Parties have entered into this First Amendment to Maintenance/General Services Agreement as of the date noted on the first page of the Amendment.
AUGUSTINE GENERAL ENGINEERING
a California general partnership
By: _________________________
Michael T. Lowen
General Partner
By: _________________________
Augustine Mendez
General Partner
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA ORANGE\DDERLETH\55191.2 PTEAM 03102022
EXHIBIT "D"
DESCRIPTION OF UTILITY RETROFIT WORK
Provide all labor, materials and equipment to install manhole covers, raising and extension of existing air vacs and construction of an 18-inch curb around the existing lift station as follows:
• USA DigAlert notification
• Mobilization of equipment and materials
• Remove and replace twenty-one (21) 24-inch and one (1) 36-inch manhole ring and covers within the Prado Dam flood zone. Manhole covers provided are Alhambra Foundry model #A-1254-B and A-1251-B6 water tight bolt down lids. All work to be performed pursuant to City of Corona standard 302.
• Removal of three (3) existing 1-inch air vacs up to an additional 12-inches in height • Extend one (1) 2-inch air vac approximately 200 ft from its existing location to a new point above the flood zone height. Work to include R&R of existing asphalt, SE30 sand bedding, backfill and compaction, installation of concrete pads and haul away spoils and asphalt
• Installation of 100 linear feet of 18-inch curbing around existing lift station • Provide traffic control
• Demobilization of equipment
Total Compensation for Utility Relocation Work: $175,860.00 Manhole cover R & R $118,295.00
Raise three (3) existing air vacs $1,800.00
Extension of existing two-inch air vac $33,465.00
Lift Station Curbing $18,800.00
Bond Costs $3,500.00
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA 7 (BB&K: 9-10)
ORANGE\DDERLETH\55191.2 PTEAM 03102022
EXHIBIT "E"
REIMBURSEMENT AGREEMENT
[ATTACHED ON FOLLOWING PAGES]
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA ´ 0 2,000 4,000
Feet
ORANGE COUNTY PUBLIC WORKS 1 inch = 4,000 feet 1:48,000
PRADO DAM UTILITY RELOCATIONS
EXHIBIT A
New Inundation@Elev 566-ft
Prado Existing Basin@Elev 556-ft
Highways
Jurisdictional Boundary
NAD83 State Plane California Zone 6
NGVD29
10/15/2021
OCPW 2015 Topo, Tetra Tech, Bing Maps
Map Projection:
Vertical Datum:
Map Created:
Data Sources:
EXHIBIT A
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA ´ 0 550 1,100
Feet
ORANGE COUNTY PUBLIC WORKS 1 inch = 1,100 feet 1:13,200
PRADO DAM UTILITY RELOCATIONS
EXHIBIT B
XY RW Flow Meter
$K Lift Station (Impacted)
"J Air Vac (Impacted)
!H Sewer Manholes
!H Sewer Manholes (Impacted)
!H Sewer Manholes (Impacted/Sealed)
Highways
Jurisdictional Boundary
New Inundation@Elev 566-ft
Prado Existing Basin@Elev 556-ft
Alcoa Levee Alignment
Levee Road Grading
NAD83 State Plane California Zone 6
NGVD29
10/14/2021
OCPW 2015 Topo, Corona GIS, Bing Maps
Map Projection:
Vertical Datum:
Map Created:
Data Sources:
EXHIBIT B
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA 8 (BB&K: 9-10)
ORANGE\DDERLETH\55191.2 PTEAM 03102022
EXHIBIT "F"
DEPARTMENT OF LABOR FEDERAL WAGE DETERMINATION
[ATTACHED ON FOLLOWING PAGES]
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA "General Decision Number: CA20210025 11/12/2021
Superseded General Decision Number: CA20200025
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
County: Riverside County in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a
classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor
requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/01/2021
1 01/08/2021
2 01/22/2021
3 03/05/2021
4 03/19/2021
5 04/30/2021
6 06/25/2021
7 07/23/2021
8 07/30/2021
9 08/06/2021
10 08/20/2021
11 10/01/2021
12 10/08/2021
13 10/15/2021
14 10/22/2021
15 10/29/2021
16 11/12/2021
ASBE0005-002 09/01/2021
Rates Fringes
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
protective coverings,
coatings, and finishes to all
types of mechanical systems).....$ 47.25 24.45
Fire Stop Technician
(Application of Firestopping
Materials for wall openings
and penetrations in walls,
floors, ceilings and curtain
walls)...........................$ 32.09 19.66
---------------------------------------------------------------- ASBE0005-004 07/05/2021
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)....$ 22.40 13.07
---------------------------------------------------------------- BOIL0092-003 01/01/2021
Rates Fringes
BOILERMAKER......................$ 46.03 38.81
---------------------------------------------------------------- * BRCA0004-011 05/01/2020
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 41.48 18.63
*The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the
standard San Bernardino/Riverside County hourly wage rate ---------------------------------------------------------------- BRCA0018-004 06/01/2019
Rates Fringes
MARBLE FINISHER..................$ 33.43 14.11
TILE FINISHER....................$ 28.23 12.65
TILE LAYER.......................$ 40.07 18.36
---------------------------------------------------------------- BRCA0018-010 09/01/2020
Rates Fringes
TERRAZZO FINISHER................$ 33.66 14.20
TERRAZZO WORKER/SETTER...........$ 41.60 14.73
---------------------------------------------------------------- CARP0213-001 07/01/2021
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA Rates Fringes
CARPENTER
(1) Carpenter, Cabinet
Installer, Insulation
Installer, Hardwood Floor
Worker and acoustical
installer...................$ 51.60 16.28
(2) Millwright..............$ 52.10 16.48
(3) Piledrivermen/Derrick
Bargeman, Bridge or Dock
Carpenter, Heavy Framer,
Rock Bargeman or Scowman,
Rockslinger, Shingler
(Commercial)................$ 51.73 16.28
(4) Pneumatic Nailer,
Power Stapler...............$ 51.85 16.28
(5) Sawfiler...............$ 51.69 16.28
(6) Scaffold Builder.......$ 42.80 16.28
(7) Table Power Saw
Operator....................$ 51.70 16.28
FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a
substitute for back forms (which work is performed by
piledrivers): $0.13 per hour additional.
---------------------------------------------------------------- CARP0213-002 07/01/2021
Rates Fringes
Diver
(1) Wet.....................$ 834.40 16.28
(2) Standby.................$ 445.84 16.28
(3) Tender..................$ 437.84 16.28
(4) Assistant Tender........$ 413.84 16.28
Amounts in ""Rates' column are per day
---------------------------------------------------------------- CARP0213-004 07/01/2021
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 51.60 16.28
STOCKER/SCRAPPER............$ 22.16 8.62
---------------------------------------------------------------- CARP0721-001 07/01/2021
Rates Fringes
Modular Furniture Installer......$ 21.85 7.15
---------------------------------------------------------------- ELEC0440-001 12/28/2020
Rates Fringes
ELECTRICIAN
INSIDE ELECTRICIAN..........$ 46.75 3%+23.67
INTELLIGENT TRANSPORTATION
SYSTEMS
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA Electrician................$ 36.99 3%+23.18
Technician.................$ 27.75 3%+23.18
ZONE PAY: Zone A: Free travel zone for all contractors
performing work in Zone A.
Zone B:Any work performed in Zone (B) shall add $12.00 per hour to the current wage scale. Zone (B) shall be the area from the eastern perimeter of Zone (A) to a line which runs north and south begininng at Little Morongo Canyon (San Bernardino/Riverside County Line), Southeast along the
Coachella Tunnels, Colorado River Aqueduct and Mecca
Tunnels to Pinkham Wash then South to Box Canyon Road, then southwest along Box Canyon Road to Highway 195 west onto 195 south to Highway 86 to Riverside/Imperial County Line. ---------------------------------------------------------------- ELEC1245-001 06/01/2021
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 60.19 21.94
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment)...........$ 48.08 20.73
(3) Groundman...............$ 36.76 20.33
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0018-001 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 59.32 35.825+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0012-003 07/01/2020
Rates Fringes
OPERATOR: Power Equipment
(All Other Work)
GROUP 1....................$ 48.25 27.20
GROUP 2....................$ 49.03 27.20
GROUP 3....................$ 49.32 27.20
GROUP 4....................$ 50.81 27.20
GROUP 5....................$ 48.96 25.25
GROUP 6....................$ 51.03 27.20
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA GROUP 8....................$ 51.14 27.20
GROUP 9....................$ 49.29 25.25
GROUP 10....................$ 51.26 27.20
GROUP 11....................$ 49.41 25.25
GROUP 12....................$ 51.43 27.20
GROUP 13....................$ 51.53 27.20
GROUP 14....................$ 51.56 27.20
GROUP 15....................$ 51.64 27.20
GROUP 16....................$ 51.76 27.20
GROUP 17....................$ 51.93 27.20
GROUP 18....................$ 52.03 27.20
GROUP 19....................$ 52.14 27.20
GROUP 20....................$ 52.26 27.20
GROUP 21....................$ 52.43 27.20
GROUP 22....................$ 52.53 27.20
GROUP 23....................$ 52.64 27.20
GROUP 24....................$ 52.76 27.20
GROUP 25....................$ 52.93 27.20
OPERATOR: Power Equipment
(Cranes, Piledriving &
Hoisting)
GROUP 1....................$ 49.60 27.20
GROUP 2....................$ 50.38 27.20
GROUP 3....................$ 50.67 27.20
GROUP 4....................$ 50.81 27.20
GROUP 5....................$ 51.03 27.20
GROUP 6....................$ 51.14 27.20
GROUP 7....................$ 51.26 27.20
GROUP 8....................$ 51.43 27.20
GROUP 9....................$ 51.60 27.20
GROUP 10....................$ 52.60 27.20
GROUP 11....................$ 53.60 27.20
GROUP 12....................$ 54.60 27.20
GROUP 13....................$ 55.60 27.20
OPERATOR: Power Equipment
(Tunnel Work)
GROUP 1....................$ 50.10 27.20
GROUP 2....................$ 50.88 27.20
GROUP 3....................$ 51.17 27.20
GROUP 4....................$ 51.31 27.20
GROUP 5....................$ 51.53 27.20
GROUP 6....................$ 51.64 27.20
GROUP 7....................$ 51.76 27.20
PREMIUM PAY:
$3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval
Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp
Pendleton
Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator
operator-inside; Engineer Oiler; Forklift operator
(includes loed, lull or similar types under 5 tons;
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank operator); Concrete mixer operator-skip type; Conveyor operator;
Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd.
without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -
drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling
(above ground tunnel); Power concrete curing machine
operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck
GROUP 5: Equipment Greaser (Grease Truck/Multi Shift).
GROUP 6: Articulating material hauler; Asphalt plant
engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator,
bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45'
maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track
maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete,
Clary-Johnson-Bidwell or similar); Micro tunnel system
(below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator
(crawler and wheel type, over 3/4 yd. and up to and
including 1-1/2 yds.); Slip form pump operator (power
driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and
including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine
operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or
similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar type);
Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired
earth-moving equipment operator (single engine,
caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck);
Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self-
propelled curb and gutter machine operator; Shuttle buggy; Skiploader operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor
compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity,
manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull
(compaction) operator
GROUP 9: Heavy Duty Repairman
GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar
types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail
locomotive operator (diesel, gas or electric); Motor
patrol-blade operator (single engine); Multiple engine
tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment)
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified.
GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or
similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment operator
operating equipment with push-pull system (single engine, up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.)
GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple
engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system
(multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, up to and including 25 yds. struck)
GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any
combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment
operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction
units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating in tandem
(scrapers, belly dumps, and similar types in any
combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)
GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, up to and including 25 yds. struck)
GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, Caterpillar, Euclid, Athey Wagon and
similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck)
GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar type, over 50 cu. yds. struck)
CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross carrier
operator (jobsite)
GROUP 4: Bridge-type unloader and turntable operator;
Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile
operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar
gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane
repair; Tugger hoist operator (3 drum)
GROUP 8: Crane operator (up to and including 25 ton
capacity); Crawler transporter operator; Derrick barge
operator (up to and including 25 ton capacity); Hoist
operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to and
including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry
GROUP 11: Crane operator (over 100 tons and up to and
including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc)
GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and
including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)
TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. without
attachment)
GROUP 2: Power-driven jumbo form setter operator
GROUP 3: Dinkey locomotive or motorperson (up to and
including 10 tons)
GROUP 4: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons)
GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading
shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator
ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below:
That area within the following Boundary: Begin in San
Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 6, T25S, R42E, MDM. Continue W along the Inyo and San
Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.
Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.
Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.
Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM.
Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM
$1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below:
That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM.
Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM.
Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W.
Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM.
$2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below:
That area within the following Boundary: Begin at the
intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM.
Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM.
Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM.
Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM.
REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE
---------------------------------------------------------------- ENGI0012-004 08/01/2020
Rates Fringes
OPERATOR: Power Equipment
(DREDGING)
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA (1) Leverman................$ 56.40 30.00
(2) Dredge dozer............$ 50.43 30.00
(3) Deckmate................$ 50.32 30.00
(4) Winch operator (stern
winch on dredge)............$ 49.77 30.00
(5) Fireman-Oiler,
Deckhand, Bargeman,
Leveehand...................$ 49.23 30.00
(6) Barge Mate..............$ 49.84 30.00
---------------------------------------------------------------- IRON0433-006 07/01/2020
Rates Fringes
IRONWORKER
Fence Erector...............$ 34.58 24.81
Ornamental, Reinforcing
and Structural..............$ 41.00 33.45
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0300-005 03/01/2021
Rates Fringes
Asbestos Removal Laborer.........$ 37.49 21.88
SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and
disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaffolding,
fabrication of temporary wooden barriers and assembly of decontamination stations.
---------------------------------------------------------------- LABO0345-001 07/01/2021
Rates Fringes
LABORER (GUNITE)
GROUP 1.....................$ 46.50 20.42
GROUP 2.....................$ 45.55 20.42
GROUP 3.....................$ 42.01 20.42
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a
Bosn'n's Chair or suspended from a rope or cable shall
receive 40 cents per hour above the foregoing applicable classification rates. Workers doing gunite and/or
shotcrete work in a tunnel shall receive 35 cents per hour above the foregoing applicable classification rates, paid on a portal-to-portal basis. Any work performed on, in or above any smoke stack, silo, storage elevator or similar type of structure, when such structure is in excess of
75'-0"" above base level and which work must be performed in whole or in part more than 75'-0"" above base level, that work performed above the 75'-0"" level shall be compensated for at 35 cents per hour above the applicable
classification wage rate.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Rodmen, Nozzlemen
GROUP 2: Gunmen
GROUP 3: Reboundmen
---------------------------------------------------------------- LABO1184-001 07/01/2021
Rates Fringes
Laborers: (HORIZONTAL
DIRECTIONAL DRILLING)
(1) Drilling Crew Laborer...$ 38.89 17.10
(2) Vehicle Operator/Hauler.$ 39.06 17.10
(3) Horizontal Directional
Drill Operator..............$ 40.91 17.10
(4) Electronic Tracking
Locator.....................$ 42.91 17.10
Laborers: (STRIPING/SLURRY
SEAL)
GROUP 1.....................$ 40.10 20.12
GROUP 2.....................$ 41.40 20.12
GROUP 3.....................$ 43.41 20.12
GROUP 4.....................$ 45.15 20.12
LABORERS - STRIPING CLASSIFICATIONS
GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician
GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and
preparation of surface for coatings. Traffic control
person: controlling and directing traffic through both
conventional and moving lane closures; operation of all related machinery and equipment
GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This
category includes all traffic related surface preparation DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA (sandblasting, waterblasting, grinding) as part of the
application process. Traffic protective delineating system installer: removes, relocates, installs, permanently
affixed roadside and parking delineation barricades,
fencing, cable anchor, guard rail, reference signs,
monument markers; operation of all related machinery and equipment; power broom sweeper
GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all
related machinery and equipment
---------------------------------------------------------------- LABO1184-002 07/01/2020
Rates Fringes
LABORER (TUNNEL)
GROUP 1.....................$ 42.54 21.04
GROUP 2.....................$ 42.86 21.04
GROUP 3.....................$ 43.32 21.04
GROUP 4.....................$ 44.01 21.04
LABORER
GROUP 1.....................$ 36.39 21.04
GROUP 2.....................$ 36.94 21.04
GROUP 3.....................$ 37.49 21.04
GROUP 4.....................$ 39.04 21.04
GROUP 5.....................$ 39.39 21.04
LABORER CLASSIFICATIONS
GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike-off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or
water pipeline laborer; Laborer, asphalt-rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator
(walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete; Railroad maintenance, repair track person and road beds; Streetcar and railroad construction track laborers; Rigging and signaling; Scaler; Slip form raiser; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations
GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and
installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curbs, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water
pipeline wrapper - pot tender and form person; Guinea
chaser; Headerboard person - asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer(lead); Tank DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA scaler and cleaner; Tree climber, faller, chain saw
operator, Pittsburgh chipper and similar type brush
shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay-kold,
creosote, lime caustic and similar type materials
(""applying"" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating
machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Wacker and similar type; Trenching machine, hand-propelled
GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Head rock
slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize
concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster
(nozzle person), water blasting, Porta Shot-Blast
GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person; Dump
person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.) GROUP 2: Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic
tools (except driller); Bull gang mucker, track person; DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA Concrete crew, including rodder and spreader
GROUP 3: Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; Jumbo person; Kemper and other pneumatic concrete placer operator; Miner, tunnel (hand or machine); Nozzle person; Operating of
troweling and/or grouting machines; Powder person (primer house); Primer person; Sandblaster; Shotcrete person; Steel form raiser and setter; Timber person, retimber person, wood or steel; Tunnel Concrete finisher
GROUP 4: Diamond driller; Sandblaster; Shaft and raise work ---------------------------------------------------------------- LABO1184-004 07/01/2021
Rates Fringes
Brick Tender.....................$ 35.82 20.45
---------------------------------------------------------------- LABO1414-001 08/05/2020
Rates Fringes
LABORER
PLASTER CLEAN-UP LABORER....$ 36.03 21.01
PLASTER TENDER..............$ 38.58 21.01
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0036-001 07/01/2020
Rates Fringes
Painters: (Including Lead
Abatement)
(1) Repaint (excludes San
Diego County)...............$ 29.59 17.12
(2) All Other Work..........$ 33.12 17.24
REPAINT of any previously painted structure. Exceptions:
work involving the aerospace industry, breweries,
commercial recreational facilities, hotels which operate commercial establishments as part of hotel service, and sports facilities.
---------------------------------------------------------------- PAIN0036-008 10/01/2021
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 43.63 22.92
---------------------------------------------------------------- PAIN0036-015 01/01/2020
Rates Fringes
GLAZIER..........................$ 43.45 23.39
FOOTNOTE: Additional $1.25 per hour for work in a condor, from the third (3rd) floor and up Additional $1.25 per
hour for work on the outside of the building from a swing stage or any suspended contrivance, from the ground up
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA ---------------------------------------------------------------- PLAS0200-009 08/04/2021
Rates Fringes
PLASTERER........................$ 45.77 18.39
---------------------------------------------------------------- PLAS0500-002 07/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.50 25.91
---------------------------------------------------------------- PLUM0016-001 09/01/2021
Rates Fringes
PLUMBER/PIPEFITTER
Work ONLY on new additions
and remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space.................$ 52.20 24.38
Work ONLY on strip malls,
light commercial, tenant
improvement and remodel
work........................$ 39.91 22.71
All other work except work
on new additions and
remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space and work on
strip malls, light
commercial, tenant
improvement and remodel
work........................$ 53.83 25.36
---------------------------------------------------------------- PLUM0345-001 09/01/2021
Rates Fringes
PLUMBER
Landscape/Irrigation Fitter.$ 36.85 24.75
Sewer & Storm Drain Work....$ 40.94 22.13
---------------------------------------------------------------- ROOF0036-002 08/01/2021
Rates Fringes
ROOFER...........................$ 42.07 18.92
FOOTNOTE: Pitch premium: Work on which employees are exposed to pitch fumes or required to handle pitch, pitch base or pitch impregnated products, or any material containing coal tar pitch, the entire roofing crew shall receive $1.75 per hour ""pitch premium"" pay.
---------------------------------------------------------------- SFCA0669-002 04/01/2021
Rates Fringes
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA SPRINKLER FITTER.................$ 41.27 26.23
---------------------------------------------------------------- SHEE0105-003 07/01/2021
LOS ANGELES (South of a straight line drawn between Gorman and Big Pines)and Catalina Island, INYO, KERN (Northeast part, East of Hwy 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES Rates Fringes
SHEET METAL WORKER
(1) Commercial - New
Construction and Remodel
work........................$ 50.23 29.60
(2) Industrial work
including air pollution
control systems, noise
abatement, hand rails,
guard rails, excluding
aritechtural sheet metal
work, excluding A-C,
heating, ventilating
systems for human comfort...$ 48.28 29.46
---------------------------------------------------------------- TEAM0011-002 07/01/2020
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 32.59 30.59
GROUP 2....................$ 32.74 30.59
GROUP 3....................$ 32.87 30.59
GROUP 4....................$ 33.06 30.59
GROUP 5....................$ 33.09 30.59
GROUP 6....................$ 33.12 30.59
GROUP 7....................$ 33.37 30.59
GROUP 8....................$ 33.62 30.59
GROUP 9....................$ 33.82 30.59
GROUP 10....................$ 34.12 30.59
GROUP 11....................$ 34.62 30.59
GROUP 12....................$ 35.05 30.59
WORK ON ALL MILITARY BASES:
PREMIUM PAY: $3.00 per hour additional.
[29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, El Centro Naval Facility, Fort Irwin, Marine Corps
Logistics Base at Nebo & Yermo, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception,
Vandenberg AFB]
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Truck driver
GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom
GROUP 3: Driver of vehicle or combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less than 16 yds. water level; Erosion control driver
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete truck, less than 6-1/2 yds. water level
GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work;
Slurry truck driver
GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump truck, 16 yds. to 25 yds. water level
GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver
GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder
GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over
GROUP 10: Dump truck - 50 yds. or more water level; Water pull - single engine with attachment
GROUP 11: Water pull - twin engine; Water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments
GROUP 12: Boom Truck 17K and above
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
---------------------------------------------------------------- DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA negotiated/CBA rate of the union locals from which the rate is based.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION"
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA
DocuSign Envelope ID: 30C8AA0B-E5B8-4620-A172-9FA07F7F4CEA Certificate Of Completion
Envelope Id: 30C8AA0BE5B84620A1729FA07F7F4CEA Status: Completed Subject: Please DocuSign: First Amendment - Augustine Prado Dam Utility Retrofit - Final 01-20-2022.pdf Source Envelope:
Document Pages: 43 Signatures: 2 Envelope Originator:
Certificate Pages: 2 Initials: 0 Carolyn Appelt
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
400 S Vicentia Ave
Corona, CA 92882
[email protected]
IP Address: 52.243.155.252
Record Tracking
Status: Original
1/20/2022 5:06:19 PM
Holder: Carolyn Appelt
[email protected]
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: City of Corona, CA Location: DocuSign Signer Events Signature Timestamp
Michael Lowen
[email protected]
GENERAL PARTNER
Security Level: Email, Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address: 137.25.166.126
Sent: 1/20/2022 5:10:15 PM
Viewed: 1/21/2022 7:30:01 AM
Signed: 1/21/2022 7:32:34 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Augustine Mendez
[email protected]
GENERAL PARTNER
Security Level: Email, Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address: 137.25.166.126
Sent: 1/21/2022 7:32:37 AM
Viewed: 1/21/2022 7:33:15 AM
Signed: 1/21/2022 7:33:33 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Purchasing
[email protected]
Security Level: Email, Account Authentication
(None)
Sent: 1/21/2022 7:33:39 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 1/20/2022 5:10:15 PM
Certified Delivered Security Checked 1/21/2022 7:33:15 AM Signing Complete Security Checked 1/21/2022 7:33:33 AM
Completed Security Checked 1/21/2022 7:33:39 AM
Payment Events Status Timestamps