CITY OF CORONA
FINANCE DEPARTMENT – PURCHASING DIVISION
===============================================
February 7, 2022
SUBJECT: Notice Inviting Bids, NIB 22-046CA
Addendum No. 2
Harrison Emergency Shelter - Phase 2
This Addendum No. 2 to the subject Notice Inviting Bids (NIB) provides a revised bid schedule, answers to questions received, ADA ramp drawings, replaces a technical specification section, and extends the bid and RFI dates.

All provisions of and attachments to this Addendum No. 2 are hereby incorporated by reference into the subject NIB. Contractors shall account for all provisions pursuant to this Addendum No. 2 in submitting their bids. Each contractor shall acknowledge receipt of this Addendum in their bid.

1. Bid & Contract Documents:

Notice Inviting Bids, paragraph 1, page 1 is hereby deleted in its entirety and replaced with the following:

The City of Corona, Public Works Department (“City”) will receive sealed bids for the Harrison Emergency Shelter – Phase 2, NIB 22-046CA through the City’s PlanetBids electronic bidding system no later than March 3, 2022, 2:00 p.m. Bids submitted after this time will not be accepted by the electronic bidding system. At said time it will be bidder’s responsibility to log into the PlanetBids system for the City of Corona to view the apparent low bidder for the project.

Bids shall be valid for 60 calendar days after the bid opening date. Bids must be submitted on the City’s Bid Forms.

2. Bid & Contract Documents:

Instructions to Bidders, Section 3 Interpretation of Contract Documents, first paragraph, is hereby deleted in its entirety and replaced with the following:

Discrepancies in, and/or omissions from the Plans, Specifications or other Contract Documents or questions as to their meaning shall be immediately brought to the attention of the City by submission of a written request for an interpretation or correction to the City. Such submission, if any, must be sent through the City’s PlanetBids electronic bidding system: https://www. planetbids. com/portal/portal. cfm?CompanyID=39497 utilizing the Questions & Answers tab. Questions must be submitted no later than 5:00 p.m., February 16, 2022.

3. Revised Bid Schedule:

The Bid Schedule is hereby deleted in its entirety and replaced with the Revised Bid Schedule appended to this Addendum 2. Revisions impact the following line items:

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 2 of 15 ends

3g. Remove and dispose of existing folder shower seat from existing Men’s and Women’s Restrooms.
6d. New Pass through cabinet per Project Plans at Unisex restrooms in the West Wing.
8d. New lavatory and sensor faucets in the Existing and New Unisex Restrooms per Project Plans. Provide new Plastisol insulated trap wrap.

Manufactured by Brocar Products, Inc. or approved equal. 8k. Per Sheet A-2a – relocate existing urinals, shall include all new necessary fittings per Key Note 25.
9l. Existing Electrical Outlet to be relocated at higher elevation on same wall per Electrical Drawings - Delta 3 - 1/18/22
11e. Existing Electrical Outlet to be relocated at higher elevation on same wall per Electrical Drawings - Delta 3 - 1/18/22
13a. 27 – New wall mounted Automatic Door Opener at entrance door. Full powered automatic oor shall comply with current codes. Add button and magnetized opener that automatically opens and remains open in a power outage situation.
14c. 24 – Relocate sink and countertops. Provide new Plastisol insluted trap wrap. Manufactured by Brocar Products, Inc. or approved equal. 14d. 25 – Relocate existing urinals. DELETE
14e. 26 – New privacy screen, to match new partitions at relocated urinals. 14j. Demolition Note E: Remove and dispose of existing partitions and doors per Detail 2.
15g. 22 – Remove and dispose of existing partition and door per demo plan Detail 17 (ADA Stall). Provide new toilet partitions and door. 18a. Remove and install four (4) exterior ADA ramps located on north, east and south sides of building per City Approved Plan to meet all current Federal, State and Local Codes.

19. Server/Data Cabinet per Sheet A-2.1. Key Note 8.

4. Technical Specifications Revision:

Delete the following specification section in its entirety and replace with the revised section appended to this Addendum 2.

Section 10 21 13 Toilet Compartments

5. Project Drawings:

Add the following plan sheets appended to this Addendum 2.

Harrison Emergency Shelter – ADA Ramps Reconstruction, prepared by Pettit, Sheets T-1 through A-3.2 (11 sheets total)

6. Questions and Answers:

Question 1: “Is there any pre-qualification required for bidding on this project?” Answer: No. Please refer to bid documents for requirements. All contractors must meet and submit all required documents with their bid as stated in bid documents.

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 3 of 15 ends

Question 2: “Was the project required any special labor agreement, as PLA or CWA?” Answer: No. Please refer to bid documents for all prevailing wages and labor contract requirements.

Question 3: “For the Demo, was there Asbestos/Lead Paint existed in the building? If so, provide a Test Report.”
Answer: Lead, asbestos and mold survey was performed by A-Tech Consulting. All mold was abated during Phase I. There is no lead paint found and asbestos was only found in roofing shingles which was replaced as part of Phase 1. Test survey results will be available to the awarded contractor.

Question 4: “In the Special Conditions, the City had a Franchise Agreement with Waste Management Company. Will the Dumpster be provided by the City or Contractor?”
Answer: Contractor is responsible for scheduling and payment for the dumpster.

Question 5: “Was there a 50% minimum Prime Contractor’s Self Performance requirement per Greenbook? If so, what were the specialty items.”
Answer: Please refer to bid documents section “Designation of Subcontractors”.

Question 6: “There were Deferred Submittal Items on Plan T-1 for Fire Alarm, Fire Sprinkler, Security Alarm System, and (4) Exterior Ramp & Landings. Were these items under this project/contract?”
Answer: Fire alarm, fire sprinklers and security alarm are not part of this bid.

Question 7: “Was there (E) Fire Alarm System? If so, provide the panel information and the current service/monitoring contractor’s contact information?” Answer: Fire alarm, fire sprinklers and security alarm are not part of this bid. During construction, contractor to coordinate with project manager.

Question 8: “Was there (E) Fire Sprinkler System? If so, provide the as-built plan to acknowledge the existing system?”
Answer: Fire alarm, fire sprinklers and security alarm are not part of this bid. Existing plans can be provided upon request after award of contract.

Question 9: “Was there (E) Security Alarm System? If so, provide the as-built plan and the required (N) Security Alarm System details.”
Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 4 of 15 ends

Answer: Fire alarm, fire sprinklers and security alarm are not part of this bid. Existing plans can be provided upon request after award of contract.

Question 10: “Bid Schedule listed “Estimated QTY” at each bid item. It was difficult to match with Plan Keynotes due to different QTY, SF, and LF from the plan. Please provide the referenced Keynotes with plan numbers on the bid schedule for covering all project scopes of works. Or Area/Section Name, at least.” Answer: All quantities provided in the bid documents are for bidding purposes only.

Contractor will be only paid for field measured quantities for lump sum item as lump sum, sq. ft for submitted sq. ft. price and each item will be paid on submitted each item price etc.

Question 11: “Bid Schedule #12i, 12j,12k, 12l, 12m, 12n, & 12r were referred to the pictures; however, there was no picture provided in the bid package. Please provide the pictures.”
Answer: Refer to attached Exhibit 'A’. Please note these areas were pointed out during the mandatory job walk.

Question 12: “Bid Schedule #4b was listed 45min rated door; however, there was no 45-min rated door in the door schedule on Plan A-8. Please clarify.” Answer: There are no 45-min fire rated doors in project. Please refer to Door Schedule on sheet A-8.

Question 13: “Provide the complete Door Hardware Set information. The Technical Spec Section 080671 was not listed.”
Answer: Please refer to Door Schedule of Sheet A-8. All doors hardware shall be Schlage or approved equal.

Question 14: “Bid Schedule #4d was listed 3070 SC Door; however, there was no 3070 door in the door schedule on Plan A-8. Please clarify.”
Answer: The SC doors are 3’-0”x 6’-8”.

Question 15: “Bid Schedule 11c called for 1” conduit. Would it be just stub-out for the future work per Plan? Please advise.”
Answer: This will be a stub out for future work to be performed by others.

Question 16: “Bid Schedule #12p &12q were required to replace (E) Light Fixtures. Please provide the (E) fixtures’ model number with manufacture information.” Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 5 of 15 ends

Answer: Not Available. Off the shelf matching models will be accepted upon approval.

Question 17: “Bid Schedule #12s called for hiding exposed wiring. What was the proximate LF and locations?”
Answer: Not Available, please refer to your job walk notes. See attached picture provide in Exhibit ‘A’.

Question 18: “Bid Schedule #12i, 12k, 12l, 12m called for repairing flooring, wall, and counter.

What was the SF? And What Finish Project (Name and Model #)?” Answer: Please see attached pictures in Exhibit ‘A’. This is a field condition and was mentioned in the mandatory job walk.

Question 19: “Bid Schedule #16a called for the backup generator. What was the specification?” Answer: Generator shall be sized to provide back-up power to the building in case of power outage. The unit shall be Caterpillar or approved equal with automatic transfer switch. The generator shall be sized appropriately to power the entire building.

Please refer to electrical drawings for existing electrical load at Plan No E-0.2 Rev

1. This will be design and built portion of the project. Contractor to provide plans, specification and pull all necessary building permits.

Question 20: “There were many “IF Not or IF New” uncleared (E) conditions on the plan as G/N 1 on G-2, Note 3 on A-1, Keynote 10, 23, 28 on A-2a Keynote 12&14 on A-2. The uncleared scopes called notes with “IF Not or IF New” were not appropriated for Bid Project to propose the correct cost. Please revise the keynotes clearly for the bidders to bid correctly.”
Answer: G/N 1 & 2 on G-2 were scope of work for Phase 1; not for Phase 2. You can omit.

Note 3 on A-1 was corrected; it is existing. You can omit. Keynotes 10, 23, 28 on A-2a to be field verified by Contractor. Keynotes 12 & 14 on A-2 to be field verified by Contractor.

Question 21: “There were many (N) scope Products called as “Selected by Owner” on Plan A-2a & A-3; and “Selected by Client” on A-2.1 & A-3.1. Will these items be provided by either Owner or Client and install by contractor (OFCI)? Or CFCI? Please Clarify it. There was no Product Details (Mfg. Name and Model Number in the Bid Spec.).”
Answer: Contractor to provide submittals for Owner/Client to select colors and approval of submittals. All products will contractor furnish and contractor installed.

Question 22: “Keynote 3 on A-1 called for (N) Sliding Gate. Provide the detail plan.” Answer: Keynote 3 on A-1 was corrected; it is existing. You can omit.

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 6 of 15 ends

Question 23: “Demo Keynote B on A-2a called for Demo the Portion of Low Wall. Please indicate the demo’d portion. Also, the field note called the (N) cubicles will be provided by the Owner. The scope of demo the (E) Low Wall/Cubicles was not clear. Do we have to demo the entire low walls in the area and the Owner install (N) cubicles? Please clarify the scope.”
Answer: The wall to be demolished is the one with the Keynote B. It is too close to the existing exterior door latch frame. Code requires 12” minimum dimension from door latch frame to low partition wall. In the East Dorm, there are two low walls that are affected by this. Both low walls are adjacent to existing doors.

Question 24: “Keynote 10 on A-2 called for (N) Card Reader to match exist. Please Provide the Model Number.”
Answer: Not a part of this bid. To be installed by Security contractor that was bid separately.

Question 25: “Keynote 21 on A-2 called for (N) Key Pad coordinate with Owner. Is it OFCI or CFCI? Please provide the Model Number.”
Answer: Not a part of this bid. To be installed by Security contractor that was bid separately.

Question 26: “Keynote 9 on A-2a and the Field Note on A-2 called Remove and Replace the (E) Ramps and Landings under separate submittal. Was this scope under this project? If yes, please provide the survey plan with elevation and detail plans. Also, (N) Handrails would be required?”
Answer: The ramps, landings, hand-railings, and walkways are to be done under drawing provided with this addendum to bid. Plans are currently in plan check with building department. See attached plans.

Question 27: “Keynote 16 pm A-3 called for (N) FRP. Was it required to Demo (E) FRP and Install (N) FRP?”
Answer: No. This FRP is for new restroom with new FRP to match the existing FRP in the Unisex #2.

Question 28: “Fire Department Note 25 on G-1 called “Open Burning Prohibited” in the project site; however, Welding called out on detail 5/A-3. Please verify it.” Answer: Note 25 on G-1 “Open Burning Prohibited” is a general note for the owner. It is so no occupant will make a fire anywhere on the property. The welding called out on detail 5/A-3 is for the installation of the grab bars inside the restrooms. Not related.

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 7 of 15 ends

Question 29: “Plan M-1 called for (N) EF-1 with duct to roof cap. Was it intention to connect the (N) duct to the existing roof cap? If not, please provide the detail plan for the roof penetration and install (N) roof cap.”
Answer: Yes, install new bathroom exhaust fan with roof cap. Please refer to Plan No, M-1.

Question 30: “There was the Patio Cover plan by Duralum. Was this patio cover already contracted with the Owner and Duralum separately? And the contractor prepare for the (4) footings only? Or the award contractor should purchase and install the entire Patio Cover with the 3rd party’s structure calculation and separate permit per the bid schedule #10? Please confirm the scope.”
Answer: Contractor to purchase and install the Duralum or approved equal patio cover.

Contractor must obtain all related permits from Building Department with Duralum or approved equal structural calculation. (No fee permit) Refer to Duralum drawings and specifications sheets:

Patio Cover Shop Drawings – New Patio Cover Designed by Duralum Products G0.1 V3.12 Title Sheet, Design Loads and General Notes
G0.2 V3.12 IAPMO Approval
SP1 00 Canopy Site Plan
S1.3 V3.12 Solid Panel Structures: Type C
S1.5 V3.12 Solid Panel Structures: Tributary Width to Beams S3.1F V3.12 Solid Panel Structures: Freestanding Covers Max Span and Min Fasteners
Patio Cover Shop Drawings – New Patio Cover Designed by Duralum Products S3.2 V3.12 Solid Panel Structures: Cross Sections
S3.3 V3.12 Solid Panel Structures: Duraking and T6 Pan Max Spans and Min Fasteners
S4.1 V3.12 Solid Panel Structures: Beam Profiles
S4.3 V3.12 Solid Panel Structures: Column Profiles
S6.3 V3.12 Solid Panel Structures: Connection Details
S7.1 V3.12 Solid Panel Structures: Foundation Details
S7.2 V3.12 Solid Panel Structures: Foundation Details
S8.20.1 V3.12 Solid Cover Structures: Beam Spans, Foundation Sizes 20 PSF LL/SL, 110 MPH
Question 31: “There was Concrete Slab removal for (N) Sewer Lines per D-11 & P-1. After the scope done, who has responsibility to patch the floor finishes on the NIC area? Please Advise.”
Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 8 of 15 ends

Answer: The Contractor is responsible.

Question 32: “Please provide the Finish Schedule on the Plan and the material specifications. It was not in the bid package.”
Answer: All paint, FRP and flooring shall match existing.

Question 33: “Please provide complete required product/equipment/fixture specification for the items required under the project with Mfg. Name and Model numbers.” Answer: Contractor to submit submittals for approval by the City and color schemes. Please refer to technical provisions.

Question 34: “Will the form titled "Contractor and Subcontractor Registration Form" be required to be completely filled out with the sub-contractors information at time of bid? Or can we provide this form with the required information filled out after the bid due date?”
Answer: All subcontractor required information shall be filled out and submitted with the bid documents.

Question 35: “The Owner’s instructions in the Jobwalk, The Deferred Submittal Items on Plan T-1, Fire Sprinkler, Fire Alarm, Security System modification were not under this project and out of scopes. Please Confirm.”
Answer: Yes, they are NOT part of this contract.

Question 36: “Per KN10/A-1, It stated (E) Fire Riser, Fire Backflow upgraded. It was related with the Building Fire Sprinkler System that was not required scope under this project per the instruction during the Jobwalk. Please Confirm it is required under this project scope. If so, please provide a detail plan.” Answer: Not part of this contract.

Question 37: “KN3/A-1 for the Existing Chain-Link Rolling Gate modification was not part of this project. Please Confirm.”
Answer: Completed in Phase I. Not part of this project.

Question 38: “Per KN 36/A-1, it stated that Construct 2” RP Backflow; however, there was an (E) backflow adjacent to the building. Was the (N) backflow required under this project? Refer the Note #4 on A-1. Please Confirm that it was NOT part of the Scope under this project.”
Answer: See Bid Item 11b.

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 9 of 15 ends

Question 39: “KN 37/A-1 called for 1”DIA underground conduit to gate (Two Locations). Was it called for conduit stubbed out at the nearest location without any connection per plan? What was the recommended depth underground buried? Please Confirm.” Answer: 18” minimum electrical conduits. See response to Question 15.

Question 40: “KN10 & Demo Note B on A-2a, it called for removing (E) Gyp board and Install (N) Gyp board at (E) low wall metal studs. Was this scope for only (2) walls as indicated on plan; or all the low walls in the East Dorm as “TYP”? Also, the Field Note on Plan stated that Premanufactured Cubicles Provided by Owner. Please Clarify the scope of work for (N) Gyp Board Wall or Cubicles provided by Owner.”
Answer: Contractor to remove 2 low walls per plans.

Question 41: “The Owner’s instructions in the Jobwalk, All Items called “Selected by Owner” and “Selected by Client” on Project Plan would be Provided and Installed by Owner and Client (OFOI). Please Confirm.”
Answer: Please refer to plans and specification and refer to Question 21.

Question 42: “Per KN 9/A-2a, please provide Demo & Construction plans for (N) Ramp and Landings with (N) Guard-Rail/Handrail.”
Answer: See response to Question 26.

Question 43: “KN 8/A-2a called for Existing Handrail. Due to Remove and Replace the Ramps and Landings, the (E) Handrails could not be remained per KN 9/A-2a. Please Clarify the Scope for (E) Railings.”
Answer: See response to Question 26.

Question 44: “KN 23/A-2a & KN 16/A-3.1 called for modifying slop to 8.3% max. and Add Floor Finish to match exist. There was no opportunity to survey the existing slope during Jobwalk. Please advise if the existing ramp have to be Demo’d and Installed New with the matching finishes for the Fair Bidding purpose.” Answer: KN 23/A-2a - See response to Question 26.

Question 45: “KN 20/A-2a called for (N) Wall Mounted ADA Automatic Door Actuator. Please provide its specification with Mfg. Name and Model Number.” Answer: The door actuator and bush button shall be Record or approved equal.

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 10 of 15 ends

Question 46: “KN 10/A-2 called for (2) Card Readers and KN 21/A-2 called for (3) Keypad.

These items were related with the Security System that were not required under this project per the instruction in the jobwalk. Please Confirm that these items were required under this project. If so, provide their specifications with Mfg. Name and Model Numbers..”
Answer: Not part of this bid.

Question 47: “KN15/A-2 called for “Change of Swing” of the existing door. Please provide its modification detail plan. It is recommended to replace the Door and Door Frame to New; and use the existing hardware. Please Advise.”
Answer: Provide new door and frame with required swing per Bid Item No. 4e.

Question 48: “The Owner’s instructions in the Jobwalk, All Furniture and Cabinetry on Plan A2.1 will be furnished and installed by the Client. Please Confirm.” Answer: All cabinetries shall be furnished and installed by the Contractor or his subcontractor. These cabinets shall be made of melamine and compressed board.

Submittal for color and style to be approved by the Owner.

Question 49: “There were Field Note for Portion of (E) Stainless Steel Table to be remove to accommodate clearance requirement at (2) locations on A-3.1. Per the Site Survey during Jobwalk, it was recommended to replace with (N) shorter/smaller table instead of modifying (E) Tables due to their table configuration and finish surface quality on its corner rips. Please advise.”
Answer: Please bid per plans.

Question 50: “KN 5&6 and Demo Note A&C on Plan A-6 called for relocating the (E) Security Devices. Were these scopes under the project requirement? These were related with Fire Alarm and Security Systems that were not under this project. Please Confirm.”
Answer: Not part of this bid.

Question 51: “On the New Ramp detail per 9/A-7, Please Provide the Post Anchoring Detail (Surface Mounts or post in Concrete Footings).”
Answer: Posts shall be anchored in concrete. Engineer of record is also open to surface mount option.

Question 52: “KN 3/M-1 called for (N) EF. Please provide its detail construction plan including the duct and roof cap connection.”
Answer: See Response to Question 29.

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 11 of 15 ends

Question 53: “What was the (N) Canopy Concrete Footing Size?” Answer: Check the Duralum Shop drawings. Sheet S7.1.

Question 54: “Please Confirm that No Rebar Assemble was required in the Canopy Concrete Footings per Plan.”
Answer: Verify with Duralum Shop Drawings.

Question 55: “The Owner’s instructions in the Jobwalk, the backup generator (Bid Schedule #16a) was not part of and under this project. Please Confirm.” Answer: See response to Question 19.

Question 56: “Bid Schedule No. 12a, 12b, 12c, & 12d were not indicated on the project plan.

Please provide detail plans or advise what plan number these items can be found.” Answer: These are field conditions and are not detailed on the plans. Please refer to your pre-bid job walk notes. Please see attached pictures in Exhibit ‘A’.

Question 57: “Bid Schedule No. 12f called for S.S. Rod. Please Provide its Specification with Mfg. Name and Model Number.”
Answer: Contractors to provide submittals from standard supply store for city approval and installation for stainless steel/ or chrome platted curtain rod for shower curtains.

Question 58: “The given bid schedule (Total of 127 items) was difficult to match and the QTY with “LS” could not be justified and confirmed on the Plan. Also given scope items contained “Not in Contract” items. Please Revise the Bid Schedule with the correct scope items clearly per project plan under this contract for the fair bidding purpose.”
Answer: Revised Bid Schedule is appended to this Addendum 2.

Question 59: “Was the Gio. Tech Soil Report available for the excavation per Plan?” Answer: Geotechnical Report is not available.

Question 60: “The Owner’s instructions in the Jobwalk, the complete (N) Canopy product and Engineering Structure Calculation would be provided by the Owner and installed by contractor per KN 17 & 18/A-1. Please Confirm.”
Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 12 of 15 ends

Answer: Contractor to furnish and install. Please refer to Question 30.

Question 61: “Is there hard specifications for the washroom accessories? We are having a hard time locating this information in the spec book and in the matrix it states that the owner will choose.”
Answer: No. All accessories shall be Bradley or approved equal. Contractor to submit submittals for approval.

Question 62: “Please RFI AIA for hard spec's for the washroom accessories. Nothing in the spec book and in matrix it states that owner will choose.”
Answer: Refer to Question 61.

Question 63: “The provided Reference Only Plan, Page 40 ~ 42 of 42 were not readable. Would you provide a clear format with size of 36”X24” size.”
Answer: The approved set of plans are provided with bid set on PlanetBids.

Question 64: “Has any asbestos inspection already been done?” Answer: Please refer to Question 3.

Question 65: “For the toilet compartments and washroom accessories, in Matrix notes it states color and style to be chosen by owner. Could you please specify what color and style the owner wants?”
Answer: Contractor to submit submittals and color scheme for City’s approval. Existing compartment panels are steel and painted.

Question 66: “Keynote #8 on A2.1 refers to new server/data cabinet with door louvered and cabinet to have a fan to be selected by client. Does client have a part number or preference we can use?”
Answer: Not available. Contractor to provide a fan and louvers for air circulation.

Question 67: “Is there a fiber or copper backbone that needs to be ran back to building Demarcation point for service to new Communications room?” Answer: Contractor to install data points with conduit terminated in the attic with pull string. Data cabling is not part of this contract.

Question 68: “Does all the voice data cables terminate on a category 6 patch panel in data cabinet or does the voice need to be terminated on wall field?” Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 13 of 15 ends

Answer: Not part of this contract. See Question 67.

Question 69: “On sheet E2.2 it shows 17 new Voice Data locations and 2 existing locations.

Since all the cable was cut from existing communications room should we count the 2 existing drop locations as new?”
Answer: Refer to Question 67.

Question 70: “Who currently services the fire alarm system for the shelter? What is the current FA System installed? Please advise.”
Answer: HCI Systems, Inc.

Question 71: “Please confirm that contractor will only be responsible for fire sprinkler deferred submittal. If not what other plan submittals is the contractor responsible for?” Answer: Not part of this contract.

Question 72: “Per plan page D1.1 note D to cut concrete slab, please confirm that this is concrete and not a raised foundation. If raised foundation, please provide a detail for the access.”
Answer: Existing floors are elevated and filled with dirt.

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 14 of 15 ends

Harrison Emergency Shelter – Phase 2
Addendum 2
NIB 22-046CA

Page 15 of 15 ends

Question 73: “Confirm in the restrooms that only the walls that have work being done will have the FRP replaced. Some of the FRP has been painted and cannot not be matched.” Answer: Yes.

Question 74: “Please provide door hardware manufacture.” Answer: Schlage or approved equal.

Question 75: “Please provide backing details and locations.” Answer: Details are provided on Sheet A-31.

Carol Appelt
Carol Appelt
Purchasing Specialist V
City of Corona
Finance Dept. – Purchasing Division
400 South Vicentia Ave., Suite 320
Corona, CA 92882
Telephone: 951-279-3620
EXHIBIT ‘A’

PHOTOGRAPHS
Exhibit A “Pictures”
Bid Item 12 n.

Bid Item 12 m

Bid item 12 l

Bid item 12 k.

Bid item 12k – water stains clean with soup water.

Bid item 12j. water stain clean with soupy water.

REVISED BID SCHEDULE
1 REVISED BID SCHEDULE
Contractor shall complete the Electronic Bid Schedule found in the Line Items tab within the PlanetBids electronic bidding system and enter its bid prices there to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project. A copy of the Bid Schedule below is provided for reference purposes only and need not be completed.

The Bidder understands that these quantities are estimates only and are given solely for the purpose of facilitating the comparison of Bids and that the Contractor’s compensation will be computed on the basis of the actual quantities in the completed Work.

Item Description Est
Qty Unit Unit Cost Total Cost
1 Mobilization, demobilization, general
conditions, not to exceed 10% of total bid
price.
1 LS
$ $
2 Stipulated allowance has been set aside as
an allowance for City to reimburse
Contractor for field orders. Payment will
be made as directed by Field Order in
accordance with Extra Work, Article 50 of
the General Conditions.
1 LS
$10,000.00 $ 10,000.00
3 Interior Demolition and Concrete Work
3a Remove and dispose of existing doors and
frames.
2 EA
$ $
3b
Demo wall for new door opening, remove
section of wall, remove drywall only
(protect metal studs in place) and dispose
of demolished materials.
1 LS
$ $
3c Remove and dispose of low wall, cut for
pass through cabinet. 1 LS
$ $
3d
Remove and dispose of existing flooring
where proposed new plumbing trenches
impact existing areas. Remove flooring in
full size tiles.
900 SF
$ $
3e Saw cut, demo slab for plumbing trenches,
remove and dispose of existing concrete. 1 LS
$ $
2 Item Description Est
Qty Unit Unit Cost Total Cost
3f
Following installation of sewer and drain
piping, backfill plumbing trenches with
clean native soil or sand to top of grade,
compact to 90%, place 4” of concrete to
be level with existing top of slab with
smooth finish.
1 LS
$ $
3g
Remove and dispose of existing folding
shower seat from existing Men’s and
Women’s Restrooms.
1 LS
$ $
4 Finish Carpentry and
Doors & Hardware
4a
3068 wood, solid core doors and frames: 1-
hr rated, self closing. Includes all
hardware and adjustments.
1 EA
$ $
4b
3068 wood, solid core doors and frames:
45-min rated, self closing. Includes all
hardware and adjustments.
2 EA
$ $
4c
3068 wood, solid core doors and frames:
standard non-rated door, self closing.

Includes all hardware and adjustments.
1 EA
$ $
4d Install new 3070 solid core door. Includes
all hardware and adjustments.
1 LS $ $
4e
Install new 3036 glass door at reception
area. Includes all hardware and
adjustments.
1 LS
$ $
4f Adjust or change swing on existing
door(s). Per Project Plans.
1 LS $ $
5 Finishes
5a New metal stud walls. 383 SF $ $
5b New drywall to walls, restore ceilings for
full height walls. 766 SF
$ $
5c
Additional modifications/drywall to walls,
restore ceilings for full height walls. Per
Project Plans.
1 LS
$ $
5d Patch/repair, restore drywall to all areas
where disturbed. Per Project Plans 1 LS
$ $
5e Provide and install new insulation in walls
per Project Plans.
383 SF
$ $
5f Paint to new drywall 872 SF $ $
3 Item Description Est
Qty Unit Unit Cost Total Cost
5g
Paint to existing walls and ceilings at areas
disturbed. 1,233 SF
$ $
5h FRP Wainscot per Project Plans. 80 SF $ $
5i
Restore ceramic plank tile flooring to
match existing (at areas impacted by
plumbing trenches).
900 SF
$ $
5j
Restore and install, in kind, new tile floor
to restrooms (at areas impacted by
plumbing trenches).
128 SF
$ $
5k Restore cove base, in kind, (at areas
impacted by plumbing trenches).
30 LF
$ $
6 Specialties
6a Toilet Accessories per Project Plans. 1 LS $ $
6b
Provide and install new toilet accessories
to existing Unisex #2 Bathroom per Project
Plans.
1 LS
$ $
6c
Remove, dispose and replace existing signs
per Project Plans. Provide and install new
as required by Project Plans.
1 LS
$ $
6d
New Pass through cabinet per Project
Plans at Unisex restrooms in the West
Wing.
1 LS
$ $
6e Per Sheet A-2a – New toilet partitions. 1 LS
$ $
6f Plexiglass screen at Reception Desk per
Project Plans.
1 LS
$ $
7 Millwork, Cabinets, Countertops and
Appliances
7a New Reception Desk per Project Plans. 1 LS $ $
7b Cabinets – Upper. 33 LF
$ $
7c Cabinets – Lower. 30 LF $ $
7d Quartz Countertops. 70 SF $ $
4 Item Description Est
Qty Unit Unit Cost Total Cost
7e Refrigerator (Manufacturer and Model)
(STIPULATED allowance $3,000.00).
1 LS $ 3,000.00 $ 3,000.00
8 Plumbing
8a Excavate and install new piping in trench
drain per Project Plans.
53 LF
$ $
8b Connect new fixtures to existing drain per
Project Plans.
1 LS
$ $
8c New Water Closet in New Unisex
Restroom per Project Plans.
1 EA
$ $
8d
New lavatory and sensor faucets in the
Existing and New Unisex Restrooms per
Project Plans. Provide new Plastisol
insulated trap wrap. Manufactured by
Brocar Products, Inc. or approved equal
2 EA
$ $
8e New Cast Iron waste/vents. 2 EA $ $
8f
New sinks and auto sensor faucets in the
New Behavioral Office, Doctor’s Office,
Staff Room and the New Triage/Oral Care
Room.
4 EA
$ $
8g
Provide and install new Insta-Hot water
heaters at the new sinks in the New
Behavioral Office, Doctor’s Office, Staff
Room and the New Triage/Oral Care
Room.
4 EA
$ $
8h Remove, dispose of existing lavatory and
faucets in existing Unisex #2.
1 EA $ $
8i Install new folding shower seat in Men’s
Restroom.
1 EA $ $
8j Install new stainless steel handrails per
Project Plans. 1 LS $ $
8k
Per Sheet A-2a – relocate existing urinals,
shall include all new necessary fittings per
Key Note 25.
2 EA
$ $
9 Mechanical and Electrical
9a
Relocate electrical switch, smoke detector,
card reader, security camera to new
locations as shown on Project Plans.
1 LS
$ $
9b Remove and dispose of light fixture in
existing Storage Room.
1 EA $ $
9c Provide and install new electrical outlets per
Project Plans. 3 EA $ $
5 Item Description Est
Qty Unit Unit Cost Total Cost
9d
Provide and install new outlets for added
desks, countertops and workstations per
Project Plans.
1 LS
$ $
9e Provide and install new 6” LED downlights
per Project Plans.
3 EA $ $
9f Provide and install new 6” LED downlight
surface mounted per Project Plans. 4 EA $ $
9g Provide and install new 6” LED downlight
wall mounted per Project Plans. 1 EA $ $
9h Provide and install card readers per Project
Plans. 2 EA $ $
9i Tie into existing fire alarm and security
systems, and test. 1 LS $ $
9j Provide and install new exhaust fan in new
restroom per Project Plans. 1 LS $ $
9k
Miscellaneous electrical coordination with
existing, materials, work and testing for the
complete installation of all electrical work.
1 LS
$ $
9l
Existing Electrical Outlet to be relocated at
higher elevation on same wall per Electrical
Drawings - Delta 3 - 1/18/22
1 LS
10 New Patio Cover and Concrete Ramp
10a
Provide and install complete new patio
cover system manufactured by Duralum
Products or approved equal. Coordinate all
work with the Project Plans and cover
manufacturer’s installation instructions.

Include permit.
1 LS
$ $
10b
Sawcut, demolish and dispose of existing
concrete slab to accommodate the new patio
cover footings. (West end Parking lot)
2 EA
$ $
10c Remove and dispose of chain link fence as
shown on Project Plans. 1 LS $ $
10d Sawcut, demolish and dispose of asphalt
paving at ramp locations per Project Plans. 60 SF
$ $
10e Provide concrete ramp per Project Plans. 60 SF $ $
10f Over excavation for elevated section over V
gutter, dowel as needed.
1 LS
$ $
10g Railing with painted finish. 12 LF $ $
6 Item Description Est
Qty Unit Unit Cost Total Cost
11 Sitework
11a Restore in kind, landscaping and any
disrupted irrigation lines. 1 LS $ $
11b
Provide, install, test new 2” back flow
device, per City of Corona Standard No.
428.
1 LS
$ $
11c Provide new 1” underground conduit,
restore disrupted area in kind. 40 LF
$ $
11d Provide new warning strips on stair treads. 13 EA $ $ 11e
Remove and dispose of existing grass as
shown on Sheet D1.1 - Demolition Note A.

Construct new 6" concrete slab with
dowels.
1 LS
12 Additional Items not Included Above
12a Remove, dispose and replace all screens and
frames, in kind, on exterior windows. 24 EA
$ $
12b Remove, dispose and replace exterior vinyl
windows with cracks and stains. 5 EA
$ $
12c
Remove, use existing when possible,
replace chain link privacy slats not correctly
installed where chain link fence has been
repaired. Near block wall at east side of
building.
1 LS
$ $
12d Repair block wall on east side of building,
stucco to match building color. 1 LS
$ $
12e
Replace FRP between handicapped shower
and bathroom stalls in large Men’s restroom
on east side of building (section has existing
holes and stains).
8 EA
$ $
12f
Provide and install stainless steel shower
curtains rods and curtains (commercial
quality) at all shower stalls and bathtub
stalls. Color of curtain to be determined by
Owner.
1 LS
$ $
12g
Remove, dispose and replace tile in the
Staff and ADA restrooms in the east and
west wings to match tile floor in other areas
of the building.
1 LS
$ $
7 Item Description Est
Qty Unit Unit Cost Total Cost
12h
Remove and replace missing, damaged,
cracked or stained grout in flooring
throughout the building.
40 LF
$ $
12i Remove stains on flooring near door next to
ice maker (see picture).
1 LS
$ $
12j Prep and paint floor drain near service drain
next to the pantry in kitchen. (picture) 1 LS
$ $
12k Clean and repair damaged metal flooring in
the Walk In Freezer (picture) 1 LS
$ $
12l Clean stains on the exterior walls of Walk
In Freezer. (see picture) 1 LS
$ $
12m Repair east serving counter from kitchen to
dining room (see picture).
1 LS
$ $
12n Repaint attic accesses and surrounding
drywall where scuffed up (pictures).
1 LS
$ $
12o
Patch, repair, and paint damaged drywall
surfaces as a result of security system
revisions (2’ X 2’ each).
40 EA
$ $
12p Repair broken or inoperable recessed light
fixtures in building. 20 EA
$ $
12q Repair inoperable light in hallway leading
to the Men’s Dorm. 3 EA
$ $
12r
Repair open receptacle hole on south wall in
Behavioral Health Room of the Clinic
Wing. (see picture)
1 EA
$ $
12s
Install electrical box to hide exposed wiring
for the low voltage system and verify
voltage.
1 LS
$ $
12t Replace worn/dirty switch plate covers in
kind, at various locations in building.
40 EA
$ $
12u
Install self-tapping sheet metal (for exterior
use) screw on each side of the caps of
existing patio cover. Provide additional
caps to match existing if necessary.
1 LS
$ $
13 Sheet A-2 – Keynotes
Bid price shall include all materials, tools,
labor and supervision to provide a complete
and functional product.
8 Item Description Est
Qty Unit Unit Cost Total Cost
13a
27 – New Wall Mounted Automatic Door
Opener at entrance door. Full powered
automatic oor shall comply with current
codes. Add button and magnetized opener
that automatically opens and remains open
in a power outage situation.
1 EA
$ $
13b 28 – New Tactile Sign at entrance door. 1 EA
$ $
14 Sheet A-2a - Keynotes
Bid price shall include all materials, tools,
labor and supervision to provide a complete
and functional product.
14a 22 – Adjust countertop height. 1 EA $ $
14b 23 – Adjust ramp slope to meet current
ADA standards. 1 EA
$ $
14c
24 – Relocate sink and countertops. Provide
new Plastisol insluted trap wrap.

Manufactured by Brocar Products, Inc. or
approved equal.
1 EA
$ $
14d 25 – Relocate existing urinals. DELETE 1 LS $ $
14e 26 – New privacy screen to match new
partitions at relocated urinals. 1 LS
$ $
14f 27 – Turn handrail. 1 LS $ $
14g 28 – Adjust height of sprayer. 1 LS
$ $
14h 29 – Adjust sink height and waterproof seal
any resulting holes in mounting surface. 1 LS $ $
14i 30 – Provide new lower shelf behind folding
seat.
1 LS $ $
14j Demolition Note E: Remove and dispose of
existing partitions and doors per Detail 2. 1 LS
15 Sheet A-3.1 - Keynotes
Bid price shall include all materials, tools,
labor and supervision to provide a complete
and functional product.
15a 16 – Adjust ramp slope to meet current
ADA standards. 1 EA
$ $
15b 17 – Provide new wall mounted grab bar. 1 EA
$ $
15c 18 – Provide new folding shower seat 1 EA $ $
15d 19 – Turn handrail extension 90° 1 EA $ $
9 Item Description Est
Qty Unit Unit Cost Total Cost
15e 20 – New Stainless Steel handrail 1 EA $ $
15f 21 – Relocate existing SS handrail. 1 EA $ $
15g
22 – Remove and dispose of existing
partition and door per demo plan Detail 17
(ADA Stall). Provide new toilet partitions
and door.
1 LS
$ $
15h 23 – Provide new sign. 1 EA $ $
15i 24 – Adjust height of sprayer. 1 EA $ $
15j
25 – Provide new low stud partition wall
behind folding seat. 1 LS
$ $
15k
Per Kitchen Plan, Detail 20 - remove and
turnover to the City the Stainless Steel sink
in the Kitchen. Provide and install new
Stainless Steel sink and fittings as required
for installation.
1 LS
$ $
15l
Per Kitchen Plan, Detail 20 – relocate
existing commercial refrigerator, install
new power outlet. Clean floor prior to the
placement of equipment.
1 LS
$ $
15m
Per Kitchen Plan, Detail 20 – relocate
existing toastmaster to new location. Clean
floor prior to placement of equipment.
1 LS
$ $
15n
Per Kitchen Plan, Detail 20 – remove and
turnover to the City the existing rack located
at east end of kitchen. Clean vacated area
following removal of rack.
1 LS
$ $
15o
Per Kitchen Plan, Detail 20 – remove
portion of stainless steel table to meet
access clearance requirements. Table
located at east end of kitchen.
1 LS
$ $
15p
Per Kitchen Plan, Detail 20 – remove
stainless steel counter and turnover to the
City. Install new counter, repair
surrounding area as needed. Counter is
located on south wall of kitchen.
1 LS
$ $
10 Item Description Est
Qty Unit Unit Cost Total Cost
15q
Per Kitchen Plan, Detail 20 – remove
portion of stainless steel table to meet
access clearance requirements. Table
located near the door at the south side of
kitchen.
1 LS
$ $
15r
Per Kitchen Plan, Detail 20 – remove and
dispose of self closer from exterior door
located on north wall of Kitchen.
1 LS
$ $
16 Emergency Generator
Bid price shall include all materials, tools,
labor and supervision to provide a complete
and functional product.
16a
Provide and install emergency backup
generator to power entire facility in the
event of a power outage with auto transfer
switch. Contractor to submit plans and
obtain permit from Building Department
and Project Manager. Include system
testing.
1 LS
$ $
17 Kitchen Door Replacement
Bid price shall include all materials, tools,
labor and supervision to provide a complete
and functional product.
17a Provide and install Kitchen door per Project
Plans. 1 LS
$ $
18 ADA Ramp Improvements
Bid price shall include all materials, tools,
labor and supervision to provide a complete
and functional product.
18a
Remove and install four (4) exterior ADA
ramps located on north, east and south sides
of building per City Approved Plan to meet
all current Federal, State and Local Codes.
6,500 SF
$ $
18b
Restore in kind, surrounding landscape and
irrigation damaged or revised due to ADA
improvements above.
1 LS
$ $
18c
Restore in kind, any exterior building
finishes damaged or revised due to ADA
improvements above.
1 LS
$ $
18d Miscellaneous items not included in ADA
improvements above. 1 LS $ $
19 Server/Data Cabinet per Sheet A-2.1. Key
Note 8. 1 EA $ $

REVISED TECHNICAL SPECIFICATION
SECTION 10 21 13

TOILET COMPARTMENTS
SECTION 10 21 13

TOILET COMPARTMENTS
PART 1 GENERAL

1.1 SUMMARY
A. Work includes installation of toilet partitions per Project Plans.

1.2 REFERENCES
A. ASTM International:

1. ASTM A424 - Standard Specification for Steel, Sheet, for Porcelain Enameling.

2. ASTM A666 - Standard Specification for Austenitic Stainless-Steel Sheet, Strip, Plate, and Flat Bar.

B. Federal Specification Unit:

1. FS A-A-60003 - Partitions, Toilet, Complete.

1.3 SUBMITTALS
A. Submittal procedures.

B. Samples: Submit 6x6 inch in size illustrating panel finish, color, and sheen.

1.4 COORDINATION
A. Coordinate Work with placement of support framing and anchors in wall and floor.

PART 2 PRODUCTS

2.1 METAL TOILET COMPARTMENTS
A. Product Description: Floor mounted and overhead braced and wall mounted.

2.2 COMPONENTS
A. Stainless Steel Sheet: ASTM A666, Type 304.

B. Panels, and Pilasters: Sheet steel faces, pressure bonded to sound deadening core, formed and closed edges, mitered and welded corners ground smooth.

2.3 ACCESSORIES
A. Pilaster Shoes: ASTM A666 type 304 stainless steel with No. 4 finish, 3 inch high, concealing floor and ceiling fastenings.

B. Head Rails: Hollow stainless-steel tube, 1 x 1-5/8 inch size, with anti-grip profile and cast socket wall brackets.

C. Brackets: Stainless steel.

REMOVE CURRENT AND

INSERT NEW SECTION
Project No. 75025289
REV: 02/01/2022
Harrison Emergency Shelter - Phase 2
City of Corona
D. Attachments, Screws, and Bolts: Stainless steel.

1. For attaching panels and pilasters to brackets: Through-bolts and nuts.

2.4 FACTORY FINISHING
A. Stainless Steel Compartments: AISI No. 4 finish, with grain running long dimension of component.

Compartments shall be powered coated to match existing colors in the restrooms.

PART 3 EXECUTION

3.1 EXAMINATION
A. Coordination and project conditions.

B. Verify field measurements.

C. Verify correct location of built-in framing, anchorage, and bracing.

3.2 INSTALLATION
A. Maintain 3/8 to 1/2 inch space between wall and panels and between wall and end pilasters.

B. Attach panel brackets securely to walls using anchor devices.

C. Attach panels and pilasters to brackets.

D. Field touch-up of scratches or damaged enamel finish will not be permitted. Replace damaged or scratched materials with new materials.

3.3 ERECTION TOLERANCES
A. Maximum Variation From Indicated Position: 1/4 inch.

B. Maximum Variation From Plumb: 1/8 inch.

END OF SECTION
Project No. 75025289
REV: 02/01/2022
Harrison Emergency Shelter - Phase 2
City of Corona
SECTION 113013

RESIDENTIAL APPLIANCES
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Kitchen appliances.

1.02 RELATED REQUIREMENTS
A. Section 260583 - Wiring Connections: Electrical connections for appliances.

1.03 SUBMITTALS
A. See Section 013000 - Administrative Requirements, for submittal procedures.

B. Product Data: Manufacturer's data indicating dimensions, capacity, and operating features of each piece of residential equipment specified.

C. Copies of Warranties: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.

1.04 WARRANTY
A. See Section 017800 - Closeout Submittals, for additional warranty requirements.

B. Provide five (5) year manufacturer warranty on refrigeration system of refrigerators.

PART 2 PRODUCTS

2.01 KITCHEN APPLIANCES
A. Provide Equipment Eligible for Energy Star Rating: Energy Star Rated.

B. Refrigerator, Type [____]: Free-standing,.

1. Capacity: Total minimum storage of 18 cubic ft (0.51 cu m); minimum 15 percent freezer capacity.

2. Energy Usage: Minimum 20 percent more energy efficient than energy efficiency standards set by U.S. Department of Energy (DOE).

3. Features: Include glass shelves, automatic icemaker, light in freezer compartment, indoor water and ice dispenser, and [____].

4. Exterior Finish: Porcelain enameled steel, color as indicated.

5. Manufacturers:
a. Frigidaire Home Products; [____]: www.frigidaire.com/#sle. b. GE Appliances; [____]: www.geappliances.com/#sle.
c. Whirlpool Corp; [____]: www.whirlpool.com/#sle.
d. Hotpoint.
e. Substitutions: See Section 016000 - Product Requirements.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verify utility rough-ins are provided and correctly located.

3.02 INSTALLATION
A. Install in accordance with manufacturer's instructions.

3.03 ADJUSTING
A. Adjust equipment to provide efficient operation.

3.04 CLEANING
A. Remove packing materials from equipment and properly discard.

B. Wash and clean equipment.

END OF SECTION 113013
Project No. 75025289
REV: 02/01/2022
Harrison Emergency Shelter - Phase 2
City of Corona

REMOVE CURRENT AND

INSERT NEW SECTION
SECTION 223000

PLUMBING EQUIPMENT
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Water heaters. See approved plans Sheet P-1

1.02 REFERENCE STANDARDS
A. ICC (IPC) - International Plumbing Code Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

B. NFPA 70 - National Electrical Code Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

C. UL 1995 - Heating and Cooling Equipment Current Edition, Including All Revisions.

1.03 ADMINISTRATIVE REQUIREMENTS
A. Preinstallation Meeting: Conduct a preinstallation meeting one week prior to the start of the work of this section; require attendance by all affected installers.

B. Sequencing: Ensure that utility connections are achieved in an orderly and expeditious manner.

1.04 SUBMITTALS
A. See Section 013000 - Administrative Requirements for submittals procedures.

B. Product Data:

1. Provide electrical characteristics and connection requirements.

PART 2 PRODUCTS

2.01 WATER HEATERS
A. Tankless Electric:

1. Manufacturers:
a. Chronomite, Inc; [_____]: www.chronomite.com/#sle.

2. Type: Automatic, electric.

3. Performance:

4. Electrical Characteristics:

5. Controls: Automatic water thermostat with externally adjustable temperature range from 120 to 170 degrees F (49 to 77 degrees C), flanged or screw-in nichrome elements, enclosed controls and electrical junction box and operating light. Wire double element units so elements do not operate simultaneously.

6. Accessories:
a. Water Connections: Brass.
b. Dip Tube: Brass.
c. Drain valve.
d. Anode: Magnesium.
e. Temperature and Pressure Relief Valve: ASME labeled.

END OF SECTION 223000

REMOVE CURRENT AND

INSERT NEW SECTION
Project No. 75025289
REV: 02/01/2022
Harrison Emergency Shelter - Phase 2
City of Corona
SECTION 224001

PLUMBING FIXTURES - SERVICE SINKS
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Service sinks.

1.02 RELATED REQUIREMENTS
A. Section 079200 - Joint Sealants: Sealing joints between fixtures and walls and floors.

B. Section 114000 - Foodservice Equipment: Food service sinks.

C. Section 123600 - Countertops: Counters for sinks and lavatories.

D. Section 223000 - Plumbing Equipment.

1.03 REFERENCE STANDARDS
A. ADA Standards - Americans with Disabilities Act (ADA) Standards for Accessible Design 2010.

B. ASME A112.6.1M - Floor-Affixed Supports for Off-the-Floor Plumbing Fixtures for Public Use 1997 (Reaffirmed 2017).

C. ASME A112.18.1 - Plumbing Supply Fittings 2018, with Errata.

D. ASME A112.18.9 - Protectors/Insulators for Exposed Waste and Supplies on Accessible Fixtures 2011 (Reaffirmed 2017).

E. ASME A112.19.3 - Stainless Steel Plumbing Fixtures 2017, with Errata.

F. FM (AG) - FM Approval Guide current edition.

G. ICC A117.1 - Accessible and Usable Buildings and Facilities 2017.

H. ITS (DIR) - Directory of Listed Products current edition.

I. NSF 61 - Drinking Water System Components - Health Effects 2020.

J. NSF 372 - Drinking Water System Components - Lead Content 2020.

K. UL (DIR) - Online Certifications Directory Current Edition.

1.04 SUBMITTALS
A. See Section 013000 - Administrative Requirements for submittal procedures.

B. Product Data: Provide catalog illustrations of fixtures, sizes, rough-in dimensions, utility sizes, trim, and finishes.

C. Manufacturer's Instructions: Indicate installation methods and procedures.

D. Maintenance Data: Include fixture trim exploded view and replacement parts lists.

E. Warranty: Submit manufacturer warranty and ensure forms have been completed in Owner's name and registered with manufacturer.

F. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.

1. See Section 016000 - Product Requirements for additional provisions.

1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing the type of products specified in this section, with minimum three years of documented experience.

1.06 DELIVERY, STORAGE, AND HANDLING
A. Accept fixtures on site in factory packaging. Inspect for damage.

B. Protect installed fixtures from damage by securing areas and by leaving factory packaging in place to protect fixtures and prevent use.

1.07 WARRANTY
A. See Section 017800 - Closeout Submittals for additional warranty requirements.

INSERT NEW SECTION
Project No. 75025289
REV: 02/01/2022
Harrison Emergency Shelter - Phase 2
City of Corona
B. Provide five year manufacturer warranty for electric water cooler.

PART 2 PRODUCTS

2.01 GENERAL REQUIREMENTS
A. Potable Water Systems: Provide plumbing fittings and faucets that comply with NSF 61 and NSF 372 for maximum lead content; label pipe and fittings.

2.02 REGULATORY REQUIREMENTS
A. Comply with applicable codes for installation of plumbing systems.

B. Comply with UL (DIR) requirements.

C. Perform work in accordance with local health department regulations.

D. Provide certificate of compliance from Authority Having Jurisdiction indicating approval of installation.

2.03 SERVICE SINKS
A. Manufacturers:

1. Elkay Manufacturing Company; [______]: www.elkay.com/#sle.

B. Self-Standing, Double-Bowl, Stainless Stee Sink: 30 gal (113.5 L) capacity with fitted drain and stopper. Minimum 6" high SS back splash Size as indicated on drawings. Sheet A-3.1 C. Trim: ASME A112.18.1 exposed wall type supply with cross handles, spout wall brace, vacuum breaker, hose end spout, strainers, eccentric adjustable inlets, integral screwdriver stops with covering caps and adjustable threaded wall flanges.

D. Two-Lever Handle Service Faucet:

1. Type: Wall-mount spout faucet with union inlets and mounting plate.

2. Spray Type: Full stream spray at 1.8 gpm (6.8 Lpm), maximum.

3. ASME A112.18.1, ADA Standards, and NSF 61 compliant assembly.

4. Materials: Ceramic disc cartridge valve on brass body with polished chrome finish.

5. Products:
a. Elkay.
b. Substitutions: See Section 016000 - Product Requirements.

END OF SECTION 224000
Project No. 75025289
REV: 02/01/2022
Harrison Emergency Shelter - Phase 2
City of Corona

ADA RAMPS RECONSTRUCTION DRAWINGS