CITY OF CORONA
FINANCE DEPARTMENT – PURCHASING DIVISION
===============================================
February 23, 2022
SUBJECT: Notice Inviting Bids, NIB 22-046CA
Addendum No. 3
Harrison Emergency Shelter - Phase 2
This Addendum No. 3 to the subject Notice Inviting Bids (NIB) provides a revised bid schedule, answers to questions received, and drawings for new Alternate Bid Item 21. The bid due date and time as amended by Addendum 2 remains unchanged.
All provisions of and attachments to this Addendum No. 3 are hereby incorporated by reference into the subject NIB. Contractors shall account for all provisions pursuant to this Addendum No. 3 in submitting their bids. Each contractor shall acknowledge receipt of this Addendum in their bid.
1. Bid & Contract Documents:
Notice Inviting Bids, last paragraph, page 3 is hereby deleted in its entirety and replaced with the following:
Award of Contract: The City shall award the Contractor for the Project to the lowest responsive, responsible bidder as determined on the basis of the summation of the Total Base Bid Schedule and the Total Alternate Bid Schedules combined. However, the City may choose to award the Contract on the basis of the base bid alone or the base bid and any selected alternate bid item or combination of selected alternate bid items. The City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.
2. Bid & Contract Documents:
Bid Form, paragraph 7, page 2 is hereby deleted in its entirety and replaced with the following:
The basis of Award of this Contract shall be on the lowest responsive, responsible bid as determined on the basis of the summation of the Total Base Bid Schedule and the Total Alternate Bid Schedule combined. The City may choose to award the contract on the basis of the base bid alone or the base bid and any selected alternate bid item or combination of selected alternate items. In case of discrepancy between the unit price and the item cost set forth for a unit basis item, the unit price shall prevail and, shall be utilized as the basis for determining the lowest responsive, responsible bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the “Item Cost” column, then the amount set forth in the “Item Cost” column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the unit price.
Harrison Emergency Shelter – Phase 2
Addendum 3
NIB 22-046CA
3. Bid & Contract Documents:
Revised Bid Schedule appended to Addendum 2 is hereby deleted in its entirety and replaced with the Revised Bid Schedule appended to this Addendum 3. Revisions impact the following line items:
Delete: Section 18 ADA Ramp Improvements Line Items
18a. Remove and install four (4) exterior ADA ramps located on north, east and south sides of building per City Approved Plan to meet all current Federal, State and Local Codes.
18b. Remove and install four (4) exterior ADA ramps located on north, east and south sides of building per City Approved Plan to meet all current Federal, State and Local Codes.
18c. Restore in kind, any exterior building finishes damaged or revised due to ADA improvements above.
18d. Miscellaneous items not included in ADA improvements above.
Add: Alternate Bid Item A
20a. Remove and install four (4) exterior ADA ramps located on north, east and south sides of building per City Approved Plan to meet all current Federal, State and Local Codes.
20b. Remove and install four (4) exterior ADA ramps located on north, east and south sides of building per City Approved Plan to meet all current Federal, State and Local Codes.
20c. Restore in kind, any exterior building finishes damaged or revised due to ADA improvements above.
20d. Miscellaneous items not included in ADA improvements above.
Add: Alternate Bid Item B
21 Modify existing ADA Ramp Improvements per attached plans “Alternate Option to Addendum #2”
4. Project Drawings:
Add the following plan sheets appended to this Addendum 3.
Harrison Emergency Shelter – ADA Ramps Reconstruction, prepared by Pettit, Sheets D-1 through A-3.2 (8 sheets total) Labelled Alternate Option to Addendum 2
5. Questions and Answers:
Question 76: “There were Plans (A-4.1 & A-4.2) attached under Q&A 72 in Addendum 2. It was not readable and could not figure out what was for. Please clarify” Answer: There are no sheets A-4.1 or A-4.2 in Addendum #2. Please refer to project drawings posted to PlantBids for NIB 22-046CA.
Harrison Emergency Shelter – Phase 2
Addendum 3
NIB 22-046CA
Question 77: “Additional Question for Q&A 48, I understood all the cabinetry would be furnished and installed by the awarding contractor. How about the furniture (Desk, Chair, Printer, Refrigerator, & Work Station) as indicated on KN 1, 7, 10, 11, 13, & 14 on A-2.1? There was no information about the Furniture in the bid package.” Answer: Please refer to the Bid Schedule and plans for bid quantities.
Question 78: “Additional Question for Q&A 44, The Answer was not applicable to refer (Q&A 26) the exterior ramp. Please provide the existing Floor Finish Material Spec/Information for patching after completing the 8.3% ramp modification.” Answer: As stated previously, the exterior ramps, landings, walkways & railings are permitted under a separate application under Addendum #2. Addendum #2 was approved by the city yesterday (2/10/22). A copy of Addendum #2 will be made available by the City’s Project Manager.
Question 79: “Additional Question for Q&A 23 & 40, The answer was just removed 2 low walls.
Was the (N) wall required to install with 12” clearance per plan?” Answer: Yes, the new low wall shall match existing. The new location shall be 12” minimum clear from door latch frame. This applies to two low walls that are identified on sheet A-2a. Both low walls are adjacent to existing doors in the East Dorm.
Question 80: “Additional Question for Q&A 30 & 60, The Owner informed the Canopy was donated by Duralum already. Please double confirm that the awarding contractor must purchase and install the canopy?”
Answer: The Contractor shall purchase and install the Duralum or approved equal patio cover. Contractor must obtain all related permits from the Building Dept with the Duralum or approved equal structural calculations”.
Question 81: “Additional Question for Q&A 29 & 52, the Answer was referred Plan M-1; however, there was no details. Please provide its detail with Roof Penetration and Roof Cap Type.”
Answer: It is a standard bathroom exhaust fan with roof cap. If this contractor doesn’t know how to install a bathroom fan, a detail will be provided by a mechanical engineer.
Question 82: “Additional Question for Q&A 19 & 55, The Back Up Generator was required.
Would it be a permanent equipment? Also, where was the location? Where was the POC to the power line/conductor from the generator? No indication on the Plan. Please advise.”
Answer: The location of generator will be in the back of the building as close to the main feed at southeast corner.
Harrison Emergency Shelter – Phase 2
Addendum 3
NIB 22-046CA
Question 83: “The plans are missing the water distribution routing. Could you please provide this information?”
Answer: New connections to new restroom are to be made from existing water pipes from adjacent existing restroom.
Question 84: “Plumbing sheets do not call out fixtures. Could you please provide this information?”
Answer: Please refer standard specification section 10 21 13 provided through Addendum No. 2.
Question 85: “As per Q&A at Q#19 response - Generator set shall be “Caterpillar” but the location where it should be installed was not indicated anywhere in the electrical plans. Structural concrete pad will be constructed so we need a location without pipes/electrical lines underneath. Kindly clarify.”
Answer: Please refer to the response provided to Question 82.
Question 86: “Q&A at response for Q#47 regarding the changing of door swing – stated “Provide new door and frame with required swing per Bid Item No. 4e. The Bid Item No. “4e” is a low door, glass in metal frame while the door concerned is a 1- 1/2 Hour Fire-Rated Door as per the door schedule. Please confirm that the new door to be provided with the correct door swing should be as specified in the door schedule (1-1/2 hour fire rated) and not Bid Item No. 4e. Please clarify also if the existing hardware will be re-used or we will provide new hardware.” Answer: It was a typo. Please refer to bid schedule 4f and door schedule on plans.
Question 87: “Pass-thru cabinets were called-out under Bid Item No. 6d but there’s no detail in the Cabinetry Plan and elevations at Plan A-2.1 Kindly provide detailed drawings.” Answer: Please refer to Plan sheet A-3 rev 03.
Question 88: “Was the Bid Schedule 12b required to remove, dispose and replace the (5) entire Windows; or repair the damaged window frames at the exterior side only? It was impossible to repair the damaged exterior window frames only because it was the One-Body-Window Frame. According to the Market Search and the window manufacture’s recommendation, it should be replacing the entire windows. If the entire windows were required to replace, please provide the (N) Window Specification with Mfg. Name and Model/Size information.” Answer: Replace entire window. The frame is also damaged.
Harrison Emergency Shelter – Phase 2
Addendum 3
NIB 22-046CA
Question 89: “The Bid Schedule 12c was required to repair the chain link privacy slats with LS.
Please provide more detail information with the Pictures, QTY of Slats for the fair and accurate bid cost. It was not listed on the Project plan.” Answer: No pictures available at this time. Please refer to your job walk notes. About 4 linear feet of slats need to be replaced.
Question 90: “The Bid Schedule 12d was required to repair block wall. It was not showed on the project plan. Please provide more detail with Location, Picture, and Size/QTY of the Block Wall for the fair and accurate bid cost.”
Answer: Use a QTY of 12 SF of 8” CMU.
Question 91: “The Bid Schedule 12e was called for replacing FRP panels for QTY. 8ea. What was the 8ea? 8 FRP Panels? Please provide its detail information with Plan No. & Keynote for showing on the Project Plan for the location and size clarification.” Answer: Replace (2) 8’ x 4’ sheets of FRP.
Question 92: “For the Bid Schedule 12g, where we can find the scope keynote on the plan? We could not identify the locations/area for the listed “the Staff and ADA Restrooms in the east and west wings.” Also, it listed to match existing tile. Please provide the existing tile specification and quantities/SF of the replacing tiles for the fair and accurate bid cost.”
Answer: Contactor to match best product available as close to existing tiles.
Harrison Emergency Shelter – Phase 2
Addendum 3
NIB 22-046CA
Question 93: “The Bid Schedule 12p & 12q were called for repairing (23) broken or inoperable light fixtures. Provide the Light Fixtures’ information with Mfg. Name and Model No. Were these fixtures fixable? What if these were not fixable? The replacement cost will be added with COR after award? Please advise” Answer: These lights are recessed can lights.
Question 94: “For the Bid Schedule 12u, please provide the pictures with more information.” Answer: Reinstall detached rafter tail caps by duralum to be provided by owner using (2) sht metal #10 screws per cap.
Question 95: “For the Bid Schedule 11c and KN 37 on Plan A-1, Please Provide the detail Plan to show its POC each end for the (N) Underground 1” conduit for (40) LF.” Answer: Use standard capped 90 deg. stub up from horizontal u/g conduit, at both ends of run.
Question 96: “Wasn’t the Bid Schedule 12e already included in the Bid Schedule 5h? or different FRP?”
Answer: For bidding consistency, please provide pricing for both bid items.
Question 97: “What was the difference between the Bid Schedule 5i and 5j? Please advise with the Tile Specification.”
Answer: Two different areas. Please provide bid for each bid line item.
Carol Appelt
Carol Appelt
Purchasing Specialist V
City of Corona
Finance Dept. – Purchasing Division
400 South Vicentia Ave., Suite 320
Corona, CA 92882
Telephone: 951-279-3620
REVISED BID SCHEDULE
1 ADDENDUM 3 - REVISED BID SCHEDULE
Contractor shall complete the Electronic Bid Schedule found in the Line Items tab within the PlanetBids electronic bidding system and enter its bid prices there to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project. A copy of the Bid Schedule below is provided for reference purposes only and need not be completed.
The Bidder understands that these quantities are estimates only and are given solely for the purpose of facilitating the comparison of Bids and that the Contractor’s compensation will be computed on the basis of the actual quantities in the completed Work.
Item Description Est
Qty Unit Unit Cost Total Cost
1 Mobilization, demobilization, general
conditions, not to exceed 10% of total
bid price.
1 LS
$ $
2 Stipulated allowance has been set aside
as an allowance for City to reimburse
Contractor for field orders. Payment
will be made as directed by Field Order
in accordance with Extra Work, Article
50 of the General Conditions.
1 LS
$10,000.00 $
10,000.00
3 Interior Demolition and Concrete
Work
3a Remove and dispose of existing doors
and frames. 2 EA
$ $
3b
Demo wall for new door opening,
remove section of wall, remove
drywall only (protect metal studs in
place) and dispose of demolished
materials.
1 LS
$ $
3c Remove and dispose of low wall, cut
for pass through cabinet. 1 LS
$ $
3d
Remove and dispose of existing
flooring where proposed new plumbing
trenches impact existing areas.
Remove flooring in full size tiles.
900 SF
$ $
3e
Saw cut, demo slab for plumbing
trenches, remove and dispose of
existing concrete.
1 LS
$ $
2 Item Description Est
Qty Unit Unit Cost Total Cost
3f
Following installation of sewer and
drain piping, backfill plumbing
trenches with clean native soil or sand
to top of grade, compact to 90%, place
4” of concrete to be level with existing
top of slab with smooth finish.
1 LS
$ $
3g
Remove and dispose of existing
folding shower seat from existing
Men’s and Women’s Restrooms.
1 LS
$ $
4 Finish Carpentry and
Doors & Hardware
4a
3068 wood, solid core doors and
frames: 1-hr rated, self closing.
Includes all hardware and adjustments.
1 EA
$ $
4b
3068 wood, solid core doors and
frames: 45-min rated, self closing.
Includes all hardware and adjustments.
2 EA
$ $
4c
3068 wood, solid core doors and
frames: standard non-rated door, self
closing. Includes all hardware and
adjustments.
1 EA
$ $
4d Install new 3070 solid core door.
Includes all hardware and adjustments. 1 LS $ $
4e
Install new 3036 glass door at
reception area. Includes all hardware
and adjustments.
1 LS
$ $
4f Adjust or change swing on existing
door(s). Per Project Plans. 1 LS $ $
5 Finishes
5a New metal stud walls. 383 SF $ $
5b New drywall to walls, restore ceilings
for full height walls. 766 SF
$ $
5c
Additional modifications/drywall to
walls, restore ceilings for full height
walls. Per Project Plans.
1 LS
$ $
5d
Patch/repair, restore drywall to all
areas where disturbed. Per Project
Plans
1 LS
$ $
5e Provide and install new insulation in
walls per Project Plans. 383 SF
$ $
3 Item Description Est
Qty Unit Unit Cost Total Cost
5f Paint to new drywall 872 SF $ $
5g Paint to existing walls and ceilings at
areas disturbed. 1,233 SF
$ $
5h FRP Wainscot per Project Plans. 80 SF $ $
5i
Restore ceramic plank tile flooring to
match existing (at areas impacted by
plumbing trenches).
900 SF
$ $
5j
Restore and install, in kind, new tile
floor to restrooms (at areas impacted
by plumbing trenches).
128 SF
$ $
5k Restore cove base, in kind, (at areas
impacted by plumbing trenches). 30 LF
$ $
6 Specialties
6a Toilet Accessories per Project Plans. 1 LS $ $
6b
Provide and install new toilet
accessories to existing Unisex #2
Bathroom per Project Plans.
1 LS
$ $
6c
Remove, dispose and replace existing
signs per Project Plans. Provide and
install new as required by Project
Plans.
1 LS
$ $
6d
New Pass through cabinet per Project
Plans at Unisex restrooms in the West
Wing.
1 LS
$ $
6e Per Sheet A-2a – New toilet partitions. 1 LS
$ $
6f Plexiglass screen at Reception Desk
per Project Plans. 1 LS
$ $
7 Millwork, Cabinets, Countertops
and Appliances
7a New Reception Desk per Project Plans. 1 LS $ $
7b Cabinets – Upper. 33 LF $ $
7c Cabinets – Lower. 30 LF $ $
4 Item Description Est
Qty Unit Unit Cost Total Cost
7d Quartz Countertops. 70 SF $ $
7e Refrigerator (Manufacturer and Model)
(STIPULATED allowance $3,000.00). 1 LS $ 3,000.00 $ 3,000.00 8 Plumbing
8a Excavate and install new piping in
trench drain per Project Plans. 53 LF
$ $
8b Connect new fixtures to existing drain
per Project Plans. 1 LS
$ $
8c New Water Closet in New Unisex
Restroom per Project Plans. 1 EA
$ $
8d
New lavatory and sensor faucets in the
Existing and New Unisex Restrooms
per Project Plans. Provide new
Plastisol insulated trap wrap.
Manufactured by Brocar Products, Inc.
or approved equal
2 EA
$ $
8e New Cast Iron waste/vents. 2 EA $ $
8f
New sinks and auto sensor faucets in
the New Behavioral Office, Doctor’s
Office, Staff Room and the New
Triage/Oral Care Room.
4 EA
$ $
8g
Provide and install new Insta-Hot
water heaters at the new sinks in the
New Behavioral Office, Doctor’s
Office, Staff Room and the New
Triage/Oral Care Room.
4 EA
$ $
8h Remove, dispose of existing lavatory
and faucets in existing Unisex #2. 1 EA $ $
8i Install new folding shower seat in
Men’s Restroom. 1 EA $ $
8j Install new stainless steel handrails per
Project Plans. 1 LS $ $
8k
Per Sheet A-2a – relocate existing
urinals, shall include all new necessary
fittings per Key Note 25.
2 EA
$ $
9 Mechanical and Electrical
9a
Relocate electrical switch, smoke
detector, card reader, security camera
to new locations as shown on Project
Plans.
1 LS
$ $
5 Item Description Est
Qty Unit Unit Cost Total Cost
9b Remove and dispose of light fixture in
existing Storage Room.
1 EA
$$
9c Provide and install new electrical
outlets per Project Plans.
3 EA
$$
9d
Provide and install new outlets for
added desks, countertops and
workstations per Project Plans.
1 LS
$$
9e Provide and install new 6” LED
downlights per Project Plans.
3 EA
$$
9f
Provide and install new 6” LED
downlight surface mounted per Project
Plans.
4 EA
$$
9g
Provide and install new 6” LED
downlight wall mounted per Project
Plans.
1 EA
$$
9h Provide and install card readers per
Project Plans.
2 EA
$$
9i Tie into existing fire alarm and security
systems, and test.
1 LS
$$
9j Provide and install new exhaust fan in
new restroom per Project Plans.
1 LS
$$
9k
Miscellaneous electrical coordination
with existing, materials, work and
testing for the complete installation of
all electrical work.
1 LS
$$
9l
Existing Electrical Outlet to be
relocated at higher elevation on same
wall per Electrical Drawings - Delta 3 -
1/18/22
1 LS
10 New Patio Cover and Concrete Ramp
10a
Provide and install complete new patio
cover system manufactured by Duralum
Products or approved equal. Coordinate
all work with the Project Plans and
cover manufacturer’s installation
instructions. Include permit.
1 LS
$$
10b
Sawcut, demolish and dispose of
existing concrete slab to accommodate
the new patio cover footings. (West end
Parking lot)
2 EA
$$
10c Remove and dispose of chain link fence
as shown on Project Plans.
1 LS
$$
6 Item Description Est
Qty Unit Unit Cost Total Cost
10d
Sawcut, demolish and dispose of
asphalt paving at ramp locations per
Project Plans.
60 SF
$ $
10e Provide concrete ramp per Project
Plans. 60 SF $ $
10f Over excavation for elevated section
over V gutter, dowel as needed. 1 LS
$ $
10g Railing with painted finish. 12 LF $ $
11 Sitework
11a Restore in kind, landscaping and any
disrupted irrigation lines. 1 LS $ $
11b
Provide, install, test new 2” back flow
device, per City of Corona Standard No.
428.
1 LS
$ $
11c Provide new 1” underground conduit,
restore disrupted area in kind. 40 LF
$ $
11d Provide new warning strips on stair
treads. 13 EA $ $
11e
Remove and dispose of existing grass as
shown on Sheet D1.1 - Demolition Note
A. Construct new 6" concrete slab with
dowels.
1 LS
12 Additional Items not Included Above
12a
Remove, dispose and replace all screens
and frames, in kind, on exterior
windows.
24 EA
$ $
12b Remove, dispose and replace exterior
vinyl windows with cracks and stains. 5 EA
$ $
12c
Remove, use existing when possible,
replace chain link privacy slats not
correctly installed where chain link
fence has been repaired. Near block
wall at east side of building.
1 LS
$ $
12d
Repair block wall on east side of
building, stucco to match building
color.
1 LS
$ $
7 Item Description Est
Qty Unit Unit Cost Total Cost
12e
Replace FRP between handicapped
shower and bathroom stalls in large
Men’s restroom on east side of building
(section has existing holes and stains).
8 EA
$ $
12f
Provide and install stainless steel
shower curtains rods and curtains
(commercial quality) at all shower stalls
and bathtub stalls. Color of curtain to
be determined by Owner.
1 LS
$ $
12g
Remove, dispose and replace tile in the
Staff and ADA restrooms in the east and
west wings to match tile floor in other
areas of the building.
1 LS
$ $
12h
Remove and replace missing, damaged,
cracked or stained grout in flooring
throughout the building.
40 LF
$ $
12i Remove stains on flooring near door
next to ice maker (see picture). 1 LS
$ $
12j
Prep and paint floor drain near service
drain next to the pantry in kitchen.
(picture)
1 LS
$ $
12k Clean and repair damaged metal
flooring in the Walk In Freezer (picture) 1 LS $ $
12l Clean stains on the exterior walls of
Walk In Freezer. (see picture) 1 LS
$ $
12m Repair east serving counter from
kitchen to dining room (see picture). 1 LS
$ $
12n Repaint attic accesses and surrounding
drywall where scuffed up (pictures). 1 LS
$ $
12o
Patch, repair, and paint damaged
drywall surfaces as a result of security
system revisions (2’ X 2’ each).
40 EA
$ $
12p Repair broken or inoperable recessed
light fixtures in building. 20 EA
$ $
12q Repair inoperable light in hallway
leading to the Men’s Dorm. 3 EA
$ $
12r
Repair open receptacle hole on south
wall in Behavioral Health Room of the
Clinic Wing. (see picture)
1 EA
$ $
8 Item Description Est
Qty Unit Unit Cost Total Cost
12s
Install electrical box to hide exposed
wiring for the low voltage system and
verify voltage.
1 LS
$ $
12t Replace worn/dirty switch plate covers
in kind, at various locations in building. 40 EA
$ $
12u
Install self-tapping sheet metal (for
exterior use) screw on each side of the
caps of existing patio cover. Provide
additional caps to match existing if
necessary.
1 LS
$ $
13 Sheet A-2 – Keynotes
Bid price shall include all materials, tools, labor
and supervision to provide a complete and
functional product.
13a
27 – New Wall Mounted Automatic
Door Opener at entrance door. Full
powered automatic oor shall comply
with current codes. Add button and
magnetized opener that automatically
opens and remains open in a power
outage situation.
1 EA
$ $
13b 28 – New Tactile Sign at entrance door. 1 EA
$ $
14 Sheet A-2a - Keynotes
Bid price shall include all materials, tools, labor
and supervision to provide a complete and
functional product.
14a 22 – Adjust countertop height. 1 EA $ $
14b 23 – Adjust ramp slope to meet current
ADA standards. 1 EA
$ $
14c
24 – Relocate sink and countertops.
Provide new Plastisol insluted trap
wrap. Manufactured by Brocar
Products, Inc. or approved equal.
1 EA
$ $
14e 26 – New privacy screen to match new
partitions at relocated urinals. 1 LS $ $
14f 27 – Turn handrail. 1 LS $ $
14g 28 – Adjust height of sprayer. 1 LS $ $
14h
29 – Adjust sink height and waterproof
seal any resulting holes in mounting
surface.
1 LS
$ $
14i 30 – Provide new lower shelf behind
folding seat. 1 LS $ $
9 Item Description Est
Qty Unit Unit Cost Total Cost
14j
Demolition Note E: Remove and
dispose of existing partitions and doors
per Detail 2.
1 LS
15 Sheet A-3.1 - Keynotes
Bid price shall include all materials, tools, labor
and supervision to provide a complete and
functional product.
15a 16 – Adjust ramp slope to meet current
ADA standards. 1 EA
$ $
15b 17 – Provide new wall mounted grab
bar. 1 EA
$ $
15c 18 – Provide new folding shower seat 1 EA $ $
15d 19 – Turn handrail extension 90° 1 EA $ $
15e 20 – New Stainless Steel handrail 1 EA $ $
15f 21 – Relocate existing SS handrail. 1 EA $ $
15g
22 – Remove and dispose of existing
partition and door per demo plan Detail
17 (ADA Stall). Provide new toilet
partitions and door.
1 LS
$ $
15h 23 – Provide new sign. 1 EA $ $
15i 24 – Adjust height of sprayer. 1 EA $ $
15j 25 – Provide new low stud partition
wall behind folding seat. 1 LS
$ $
15k
Per Kitchen Plan, Detail 20 - remove
and turnover to the City the Stainless
Steel sink in the Kitchen. Provide and
install new Stainless Steel sink and
fittings as required for installation.
1 LS
$ $
15l
Per Kitchen Plan, Detail 20 – relocate
existing commercial refrigerator, install
new power outlet. Clean floor prior to
the placement of equipment.
1 LS
$ $
15m
Per Kitchen Plan, Detail 20 – relocate
existing toastmaster to new location.
Clean floor prior to placement of
equipment.
1 LS
$ $
15n Per Kitchen Plan, Detail 20 – remove
and turnover to the City the existing 1 LS
$ $
10 Item Description Est
Qty Unit Unit Cost Total Cost
rack located at east end of kitchen.
Clean vacated area following removal
of rack.
15o
Per Kitchen Plan, Detail 20 – remove
portion of stainless steel table to meet
access clearance requirements. Table
located at east end of kitchen.
1 LS
$ $
15p
Per Kitchen Plan, Detail 20 – remove
stainless steel counter and turnover to
the City. Install new counter, repair
surrounding area as needed. Counter is
located on south wall of kitchen.
1 LS
$ $
15q
Per Kitchen Plan, Detail 20 – remove
portion of stainless steel table to meet
access clearance requirements. Table
located near the door at the south side of
kitchen.
1 LS
$ $
15r
Per Kitchen Plan, Detail 20 – remove
and dispose of self closer from exterior
door located on north wall of Kitchen.
1 LS
$ $
16 Emergency Generator
Bid price shall include all materials, tools, labor
and supervision to provide a complete and
functional product.
16a
Provide and install emergency backup
generator to power entire facility in the
event of a power outage with auto
transfer switch. Contractor to submit
plans and obtain permit from Building
Department and Project Manager.
Include system testing.
1 LS
$ $
17 Kitchen Door Replacement
Bid price shall include all materials, tools, labor
and supervision to provide a complete and
functional product.
17a Provide and install Kitchen door per
Project Plans. 1 LS
$ $
18 ADA Ramp Improvements
Bid price shall include all materials, tools, labor
and supervision to provide a complete and
functional product.
11 Item Description Est
Qty Unit Unit Cost Total Cost
18a
Remove and install four (4) exterior
ADA ramps located on north, east and
south sides of building per City
Approved Plan to meet all current
Federal, State and Local Codes.
6,500 SF
$ $
18b
Restore in kind, surrounding landscape
and irrigation damaged or revised due to
ADA improvements above.
1 LS
$ $
18c
Restore in kind, any exterior building
finishes damaged or revised due to
ADA improvements above.
1 LS
$ $
18d Miscellaneous items not included in
ADA improvements above. 1 LS $ $
19 Server/Data Cabinet per Sheet A-2.1.
Key Note 8. 1 EA $ $
ALTERNATE BID ITEM A
20 ADA Ramp Improvements
Bid price shall include all materials, tools, labor
and supervision to provide a complete and
functional product.
20a
Remove and install four (4) exterior
ADA ramps located on north, east and
south sides of building per City
Approved Plan to meet all current
Federal, State and Local Codes.
6,500 SF
20b
Restore in kind, surrounding landscape
and irrigation damaged or revised due to
ADA improvements above.
1 LS
20c
Restore in kind, any exterior building
finishes damaged or revised due to
ADA improvements above.
1 LS
20d Miscellaneous items not included in
ADA improvements above. 1 LS
ALTERNATE BID ITEM B
21 Modify existing ADA per attached
plans “Alternate Option to Addendum
#2”
1 LS
ADA RAMPS RECONSTRUCTION DRAWINGS
ALTERNATE OPTION TO ADDENDUM 2