AUGUSTINE
GENERAi EKG/KEER/KG, INC.

August, 1 2022

CITY OF CORONA

DEPARTMENT OF PUBLIC WORKS
400 S. VICENTIA AVE
CORONA, CA. 92880
CA. LICENSE #1092409
DIR# 1000920033
RE: Proposal for Installation of 6" Waterline on Brae Burn, Oakland Hills & Cypress Point Work: Augustine General Engineering (AGE) will provide all labor, materials and equipment to install approximately 1630LF of 6" DI restrained waterline, (4) fire hydrants and (30) 1" water services on Brae Burn, Oakland Hills & Cypress Point in the City of Corona. The work will replace the existing 6" waterline, services and appurtenances which have had multiple failures in the past. Augustine will provide construction services as follows:
• USA DigAlert Notification.
• Provide utility verification for protection and alignment. Need to establish a clear alignment for installation. No sewer main or laterals were observed on these streets. Utility crossings are estimated at (35).
• Mobilization of equipment and materials.
• Trench asphalt saw cutting andi or grinding.
• Installation of approximately 16301f of 6" DI restrained mainline pipe w/ (4) 6" X 6" fire hydrant tees, and (1) 6" DI MJ end cap for testing. SE30 sand bedding per STD 406 w/ 3" poly warning tape. Pipe shall be double wrapped w/ polyethylene encasement and shall be installed with a minimum of 36" of cover.

Trenches to be backfilled w/ Class II base.
• Installation of (4) fire hydrants per STD 412. (Approximately 30' - 40' long) • Installation of (30) 1" water services per STD 414. Services range in length from 15' to 60' +/-. Total estimated length of services is 800LF +/-. Service runs to angle meter. • Provide trench shoring.
• Provide traffic control and onsite trucking.
• Provide chlorination, de-chlorination, leakage testing, flushing and bacteria testing. • Furnish and install (1) 8" x 6" connection onto existing 8" waterline on Brae Burn. • Perform system connection.
• Connect (30) new service lines to existing meters.
• Abandon existing 6" watermain in place. Abandon existing fire hydrants. Provide concrete bulkheads at all areas where existing main is cut.
• Provide 2" temporary asphalt over trenches during construction. • Install 5" base paving per STD 150. (Final overlay optional by City) Final overlay estimated at 54,000SF@ 2".
• Haul away existing spoils to Plant 1.

Construction Materials & Work Breakdown:

Pipeline Materials (See attached take off & quote)
SE30 Sand {720 ton Estimated)
Temporary Asphalt {115 Tons Estimated)
Class II Full Trench (1100 Tons Estimated)
Base Paving Asphalt (260 Tons Estimated)
Concrete (5 Yards Estimated)
Bacteria Testing
Labor
Equipment
Insurance
Traffic Control
Shoring
Grinding/ Saw cutting
On Site Trucking
Spoil Haul Away to Plant 1
6" Abandonment @ Existing Valve
Chlorination/ De-chlorination/ Flushing
Total Pipeline : $633,968.00
2" Grind & Overlay - $109,000.00
Bonding @ 2% - $15,250.00
Complete Total - $758,218.00
Exclusions:
■ Permits/ Permit fees
■ Engineered Plans/ Traffic control Plans
■ Survey
■ Inspection fees
■ Compaction/ concrete testing
■ SWPPP
■ Asphalt grind & Overlay (Optional at City Discretion) ■ Builders Risk Insurance/ Insurance beyond $2,000,000 aggregate ■ Water fees
■ Striping
Notes:

1. Estimated time for completion - (30-35) working days

2. All labor per prevailing wage rates.

3. City to operate all valves.

4. City to provide any replacement water meters.

5. City to provide hydrant meter and water for construction.

6. Pricing was prepared per Augustine's conceptual understanding of the work needed. Field potholing will be necessary to establish pipeline/ appurtenant alignment. Please note that there are multiple options for performing this work, and final pricing can be negotiated based on the actual construction platform determined by the City.

7. All work can be performed as a T&M if preferred by City.

8. Service parts beyond angle meter to be provided by City, including replacement boxes, if needed.

9. Asphalt grind and overlay optional at City request.

10. Due to industry material shortages and continual pricing changes, lead times of all materials and final pricing are subject to delays and potential increases. Pricing is valid for (30) days from quote date. It is anticipated that Ductile Iron pipe has long lead times at present. Optional PVC pipe and fittings may have up to a six week lead time for acquisition.

Augustine General Engineering would like to thank The City of Corona for the opportunity to bid on this project. If you have any questions or need any clarifications, please feel free to call anytime at 909-208- 2069.

Mike Lowen
Augustine General Engineering
Accepted by:. _________________ _ Date:. _____ _
Acceptance of proposal is an agreement of all terms and conditions outlined above.

AUGUST/Kl
GIKIRAI. IKGIKIIRIKG, /KC.
8780 19TH ST. BOX #298
ALTA LOMA CA. 91701
[email protected]
909-208-2069

CITY OF CORONA- BURN BRAE, CYPRESS POINT, OAKLAND HILLS WATERLINE REPLACEMENT MATERIAL TAKE OFF:

CONNECTION:
2 -6" DI MJ COUPLING
6- 6
11 DI MEGALUGS W/ ACC KIT
2-6
11 PVC MEGALUGS W/ ACC KIT
1-6" HYMAX COUPLING -DI X AC PIPE
3 -6" FL X MJ ADAPTOR
4 -6" N,B&G KITS-316SS/ 1/16" GARLOCK 3000 FF (FLANGE KIT) 1-6" DI FLANGED TEE
1-6" FL X MJ GATE VALVE
1-8" VALVE CAP-"WATER"
1-8" X 18" SLIP CAN
1-8" DEBRIS CAP (PLUG INSIDE RISER PIPE)
1-6" BLIND FLANGE
MAINLINE:
6 -6" DI 45° MJ ELBOW
3 -6
11 DI 90° MJ ELBOW
4 -6" X 6
11 DI MJ X MJ X FL TEE
1-6" DI FLANGED TEE
2 -6" FL X MJ GATE VALVE
20LF -8" CL150 C900 PVC PIPE
2-8" VALVE CAP-"WATER"
2 -8" X 18" SLIP CAN
2 -8" DEBRIS CAP (PLUG INSIDE RISER PIPE)
3 -6" N,B&G KITS-316SS/ 1/16" GARLOCK 3000 FF (FLANGE KIT) 1-6" FL X MJ ADAPTOR
35-6" DI MEGALUG W/ ACC KIT
1-6" DI MJ END CAP W/ 2" THREADED OUTLET
1638LF -6" DI PIPE CL350
93-6
11 FIELD LOCK GASKETS
4000LF-8 MIL V-BIO POLYSLEEVE FOR 6" DI PIPE-BLUE OR CLEAR (DOUBLE WRAP) 1-GALLON BITUMASTIC
2-ROLL 8-MIL POLY WRAP
1-QUART ANTI SEIZE
3000LF-3" WIDE BLUE NON DETECTABLE WARNING TAPE
END CAP TESTING:
2 -2" X 12" GALV NIPPLE
2-2" GALV 90 ELBOW
1-2" X 30" GALV NIPPLE
1-2" GALV COUPLING
1-2" THREADED BRASS VALVE W/ HAND WHEEL
1-2" GALV PLUG
1-2" GALV STR ELL
FIRE HYDRANT PER STD 412 (4):
4-6
11 FL X MJ GATE VALVE
20LF -811 CL150 C900 PVC PIPE
4-8
11 VALVE CAP-"WATER"
4 -811 X 18" SLIP CAN
4-8" DEBRIS CAP (PLUG INSIDE RISER PIPE)
4 -6" N,B&G KITS-316SS/ 1/16" GARLOCK 3000 FF (FLANGE KIT) 12-6" DI MEGALUG W/ ACC KIT
144LF -611 CL350 DI PIPE
4 -6" DI MJ 90 ELBOW
4-6" FIELD LOCK GASKET
4 -6" X 96" DI SPOOL PE X FL (8 HOLE FLANGE)
4-CLOW FIRE HYDRANT MODEL 850 W/ 8 HOLE PATTERN
4 -6" X 6" BREAK OFF SPOOL-8 HOLE X 8 HOLE
8-3/4" BREAK OFF BOLTS/ 1/16" GARLOCK 3000 FF (8 HOLE SETS) SILICON FILLED 4 -BLUE DOT REFLECTORS
1" WATER SERVICE PER STD. 414 (30): (NEW SERVICE TO BE RUN TO EXISTING METER) 30-6" X 1" BRASS SERVICE SADDLE -JONES J969-IP
30 -1" CORP STOP -Ml P X COMP -JON ES J 1935SG
800LF -1" TYPE "K" SOFT COPPER
30 -1" ANGLE METER -JONES E1963WSG -COMPRESSION

METERS PROVIDED BY CITY
OPTIONAL: (IF CITY ELECTS TO REPLACE)
30-DFW DFWPW6C4-12-4F LLPDE METER BOX AND HOPE COVER W/ READING LID H-20 RATING LABELED "WATER" -16 5/15" X 31 ¾" X 12" INSIDE DIMENSIONS 30-1" BRASS METER TAIL PIPE
30 -1" METER VALVE -JONES E1900W
30-1" X 3" BRASS NIPPLE
30-1" BRASS UNION
30-1" X 12" BRASS NIPPLE
ABANDONMENTS:
1-6" HYMAX END CAP

INLAND WATER WORKS SUPPLY CO
2468 Miramonte Drive
San Bernardino, CA 92405
909-883-8941
Fax 909-881-4041
Quotation

QUO TATI ON DATE QUOTE NUMBER
07/27/2022 S1058081
JOB NAME PAGE NO. I 1 of 7
QUO TE TO: SHIP TO:

AUGUSTINE GENERAL ENGINEERING
8780 19TH ST
BOX#298

AUGUSTINE GENER AL ENGINEERING

BURN BRAE, CYPRESS POINT, OAKLAND

HILLS WATERLINE REPLACEMENT
ALTA LOMA, CA 91701 AL TA LOMA, CA 91701

JOB BID DATE AND TIME AGENCY

N/A N/A

ORDER QTY
N/A

DESCRIPTION
··TO OUR VALUED BUSINESS PARTNERS REGARDING PRICIN ••

DUE TO CURRENT SUPPLY CHAIN DISRUPTIONS, MATERI ALS
ARE SUBJECT TO PRICING AT TIME OF SHIPMENT.

MATERI AL AVA ILABILITY AND TIMELINESS OF
SHIPMENTS CANNO T BE GUARANTEED.

THIS TERM SUPERSEDES ALL OTHER CONTRACTUAL
PROVISIONS.

WE STRONGLY ADVISE YO U TO PUT PROTECTIVE WORDING
REGARDING MATERIAL PRICING AND LDs
DUE TO LONG LEAD TIMES IN YOUR BID SUBMISSION.

THANK YOU AND GO OD LUCK ON THIS BID!
MATER IAL TAKE OFF:

CONNECTION:
2ea DOMMJSL06LACC
6" DOMESTIC MJ LONG SLEEVE LACC
6EA EBM 1106DEC
6" EBM 1106DEC MEGA LUG KIT

FITTING RESTRAINT FOR DIP
2ea EBM2006PEC
6" EBM 2006PEC MEGA LUG KIT
FITTING RESTRAINT FOR C900
1 ea 860-54-0163-16
6" HYMN< 2 FLIP COUPLING
642-768 RANGE
** Continued on Next Page*
Printed By: LUZSAN on 7/2712022 3:43:59 PM
WRITER

LUCY SANCHEZ

UNIT PRICE EXT PRICE
141.094/ea 282.19

63.520/ea 381 .12

73.065/ea 146.13
329.550/ea 329.55

INLAND WATER WORKS SUPPLY CO
2468 Miramonte Drive
San Bernardino, CA 92405
909-883-8941
Fax 909-881-4041
QUOTE TO:

AUGUSTINE GENERAL ENGINEERING
8780 19TH ST
BOX#298
ALTA LOMA, CA 91701

JOB BID DATE AND TIME AGENCY

N/A N/A NIA

ORDER QTY DESCRIPTION
3ea DOMMJFA06LACC
6" DOMESTIC MJ X FLG ADAPTER LACC
4ea BNSDOM316SS6-8
6" - 8" DOMESTIC 316SS BOLT & NUT
SET
4ea GRNA06
6" NON ASB NSF61 RING GASKET 1/16
1ea DOMFT06
6" DOMESTIC FLG TEE 124238
1 ea A2362-1906
6" MUELLER A-2362 MJ X FLG RW GATE
VALVE DI BODY C509 E381 OPEN LEFT
2" OP NUT LACC
1ea VBC86W
8" X 6" Cl VALVE BOX CAP "WATER"
1 ea GVCT0818
8" X 18" GALVANIZED TOP SECTION
1 ea DC825BLLD8
8" DEBRIS CAP DC825BL W/ LD8
1ea DOMBF06
6" DOMESTIC BLIND FLANGE
MAINLINE:
6ea DOMMJ4506LACC
6" DOMESTIC MJ 45 ELL LACC 072867
3ea DOMMJ9006LACC
6" DOMESTIC MJ 90 ELL LACC 072225
4ea DOMMJFT06LACC
6" DOMESTIC MJ X FLG TEE LACC
** Continued on Next Page *
Prinled By: LUZSAN on 7127/2022 3:43:59 PM
Quotation

QUOTATION DATE QUOTE NUMBER
07/27/2022 S1058081
JOB NAME PAGE NO. I 2 of 7
SHIP TO:

AUGUSTINE GENERAL ENGINEERING

BURN BRAE, CYPRESS POINT, OAKLAND

HILLS WATERLINE REPLACEMEN T
AL TA LOMA, CA 91701
WRITER

LUCY SANCHEZ

UNIT PRICE
127.699/ea
251.875/ea

5.000/ea
450.965/ea
881.023/ea

64.200/ea

18.500/ea

60.000/ea
124.127/ea
132.164/ea
160.740/ea
286.653/ea

EXT PRICE
383.10
1007.50

20.00 450.97
881.02

64.20 18.50

60.00 124.13
792.98
482.22
1146.61

INLAND WATER WORKS SUPPLY CO
2468 Miramonte Drive
San Bernardino, CA 92405
909-883-8941
Fax 909-881-4041
QUOTE TO:

AUGUSTINE GENERAL ENGINEERING
8780 19TH ST
BOX#298
ALTA LOMA, CA91701

JOB BID DATE AND TIME AGENCY

N/A N/A N/A

ORDER QTY DESCRIP TION
1ea DOMFT06
6" DOMESTIC FLG TEE 124238
2ea A2362-1906
6" MUELLER A-2362 MJ X FLG RW GATE
VALVE DI BODY C509 E381 OPEN LEFT
2" OP NUT LACC
20ft PVCDR1808B
8" PVC DR18 C900 PIPE BLUE
Bea VBC86W
8" X 6" Cl VALVE BOX CAP "WATER"
2ea GVCT0818
8" X 18" GALVANIZED TOP SECTION
2ea DC825BLLD8
8" DEBRIS CAP DC825BL W/ LD8
3ea BNSDOM316SS6-8
6" -8" DOMESTIC 316SS BOLT & NUT
SET
3ea GRNA06
6" NON ASB NSF61 RING GASKET 1/16
1ea DOMMJFA06LACC
6" DOMESTIC MJ X FLG ADAPTER LACC
35EA EBAA 1106DEC
6" EBAA 1106DEC MEGA LUG KIT

FITTING RESTRAINT FOR DIP
1ea DOMMJCPT06LACC
6" X 2" DOMESTIC MJ TAPT CAP LACC
1638ft DITJPC35006
6" PC350 T J DUCTILE IRON PIPE
** Continued on Next Page*
Printed By: LUZSAN on 7/27/2022 3:43:59 PM
Quotation

QUOTATION DATE QUOTE NUMBER
07/27/2022 S1058081
JOB NAME PAGE NO. l 3 of 7
SHIP TO:

AUGUSTINE GENERAL ENGINEERING

BURN BRAE, CYPRESS POINT, OAKLAND

HILLS WATERLINE REPLACEMENT
ALTA LOMA, CA 91701
WRITER

LUCY SANCHEZ

UNIT PRICE EXT PRICE
450.965/ea 450.97
881.023/ea 1762.05

25.812/ft 516.24

64.200/ea 513.60

18.500/ea 37.00

60.000/ea 120.00
251.875/ea 755.63

5.000/ea 15.00
127.699/ea 127.70

63.520/ea 2223.20
102.695/ea 102.70

24.433/f
t 40021.25

INLAND WATER WORKS SUPPLY CO
2468 Miramonte Drive
San Bernardino, CA 92405
909-883-8941
Fax 909-881-4041
QUOTE TO:

AUGUSTINE GENERAL ENGINEERING
8780 19TH ST
BOX#298
ALTA LOMA, CA 91701

JOB BID DATE AND TIME AGENCY

NIA N/A NIA

ORDER QTY DESCRIPTION
93ea GUSFL06
6" FIELD LOK GASKET
Bea PWVB1O0308X500
3" - 8" X 500' V-BIO POLY WRAP FOR
3" THRU 8" PIPE
1ea K50G
HYTECH HT50 LOW voe BI TUMASTIC
2ea PWC3X 100
3' X 100' CLEAR POLY WRAP 8 Ml L
1 ea AERVOE9120
AERVOE 9120 1202 CAN ANTI SEIZE
3ea TAPENONDETWTR3
3" WIDE NON-DECT TAPE "WATER"
END CAP TESTING:
2ea GN2X12
2" X 12" GALVANIZED NIPPLE
2ea G902
2" GALVANIZED 90 ELL
1ea GN2X30
2" X 30" GALVANIZED NIPPLE
1ea GCPLG2
2" GALVANIZED COUPLING
1ea MILUP10502
2" MIL NL UP105 BRASS GATE VLV
1ea GP2
2" GALVANIZED PLUG (CORED)
1ea GST902
2" GALVANIZED 90 ST ELL
** Continued on Next Page *
Printed By: LUZSAN on 7/27/2022 3:43:59 PM
Quotation

QUOTATION DATE QUOTE NUMBER
07/27/2022 S1058081
JOB NA ME PAGE NO. I 4 of 7
SHIP TO:

AUGUSTINE GENERAL ENGINEERING

BURN BRAE, CYPRESS POINT, OAKLAND

HILLS WATERLINE REPLACEMENT
ALTA LOMA, CA 91701
WRITER

LUCY SANCHEZ

UNIT PRICE

68.311/ea
312.155/ea

56.000/ea

35.000/ea

17.000/ea

18.000/ea

15.000/ea

20.250/ea

40.100/ea

17.000/ea
165.000/ea

11.000/ea

8.000/ea

EXT PRICE
6352.92
2497.24

56.00 70.00

17.00 54.00

30.00 40.50

40.10 17.00
165.00

11.00 8.00

INLAND WATER WORKS SUPPLY CO
2468 Miramonte Drive
San Bernardino, CA 92405
909-883-8941
Fax 909-881-4041
QUOTE TO:

AUGUSTINE GENERAL ENGINEERING
8780 19TH ST
BOX#298
ALTA LOMA, CA 91701

JOB BID DATE AND TIME AGENCY

N/A N/A N/A

ORDER QTY DESCRIPTION
FIRE HYDRANT PER STD 412 (4)
4ea A2362-1906
6" MUELLER A-2362 MJ X FLG RW GATE
VALVE DI BODY C509 E381 OPEN LEFT
2" OP NUT LACC
20ft PVCDR1808B
8" PVC DR18 C900 PIPE BLUE
4ea VBC86W
8" X 6" Cl VALVE BOX CAP "WATER"
4ea GVCT0818
8" X 18" GALVANIZED TOP SECTION
4ea DC825BLLD8
8" DEBRIS CAP DC825BL W/ LD8
4ea BNSDOM316SS6-8
6" - 8" DOMESTIC 316SS BOLT & NUT
SET
4ea GRNA06
6" NON ASB NSF61 RING GASKET 1/16
12EA EBAA1106DEC
6" EBAA 1106DEC MEGA LUG KIT

FITTING RESTRAINT FOR DIP
144ft DIT JPC35006
6" PC350 TJ DUCTILE IRON PIPE
4ea DOMMJ9006LACC
6" DOMESTIC MJ 90 ELL LACC 072225
4ea GUSFL06
6" FIELD LOK GASKET
** Continued on Next Page *
Printed By: LUZSAN oo 7/27/20'22 3:43:59 PM
Quotation

QUOTATION DATE QUOTE NUMBER
07/27/2022 S1058081
JOB NAME PAGE NO. I 5 of 7
SHIP TO:

AUGUSTINE GENERAL ENGINEERING

BURN BRAE, CYPRESS POINT, OAKLAND

HILLS WATERLINE REPLACEMENT
AL TA LOMA, CA 91701
WRITER

LUCY SANCHEZ

UNIT PRICE EXT PRICE
881.023/ea 3524.09

25.812/ft 516.24

64.620/ea 258.48

18.500/ea 74.00

60.000/ea 240.00
251.875/ea 1007.50

5.000/ea 20.00

63.520/ea 762.24

24.433/ft 3518.35
160.740/ea 642.96

68.311/ea 273.24

INLAND WATER WORKS SUPPLY CO
2468 Miramonte Drive
San Bernardino, CA 92405
909-883-8941
Fax 909-881-4041
QUOTE TO:

AUGUSTINE GENERAL ENGINEERING
8780 19TH ST
BOX#298
ALTA LOMA, CA 91701

JOB BID DATE AND TIME AGENCY

NIA NIA NIA

ORDER QTY DESCRIPTION
4ea SPOOLDIF0696
6" X 96" DI FLG SPOOL
4ea CLOW850DSY8H
CLOW 850 DI HYD 8H SAFETY YELLOW

1.5PN
4ea HE68HDOM
6" BO HYDRANT EXTENSION 8 HOLE

DOMESTIC
Bea SFBOBNS68H
SILICONE FILLED BREAK OFF BNS 8H
Bea GRNA06
6" NON ASB NSF61 RING GASKET 1116
4ea BLUEDOT

BLUE DOT MARKER ONLY
2ea BLUEDOTGLUE

EPOXY KIT FOR BLUE DOT
1" WATER SERVICE PER STD. 414
(30): (NEW SERVICE TO BE RUN TO

EXISTING METER
30ea J9696X11P
6" X 1" IP J-969 DOUBLE STRAP

BRASS SADDLE WISS
30ea E1935SG1
1" JJ NL MIP X CTSSG B CORP
800ft CPKS1100
1" K SOFT COPPER TUBE 100' COILS
30ea E1963WSG1
1" JJ NL CTSSG B AMS LW
** Continued on Next Page *
Printed By: LUZSAN on 7/27/20'12 3:43:59 PM
Quotation

QUOTATION DATE QUOTE NUMBER
0712712022 S1058081
JOB NAME PAGE NO. I 6 of 7
SHIP TO:

AUGUSTINE GENERAL ENGINEERING

BURN BRAE, CYPRESS POINT, OAKLAND

HILLS WATERLINE REPLACEMENT
ALTA LOMA, CA 91701
WRITER

LUCY SANCHEZ

UNIT PRICE EXT PRICE
996.966/ea 3987.86
2523.929lea 10095.72
255.294/ea 1021.18

59.375lea 475.00

5.000lea 40.00

7.000lea 28.00

18.000lea 36.00
202.089lea 6062.67
100.436lea 3013.08

9.6601ft 7728.00
185.913lea 5577.39

INLAND WATER WORKS SUPPLY CO
2468 Miramonte Drive
San Bernardino, CA 92405
909-883-8941
Fax 909-881-4041
QUOTE TO:

AUGUSTINE GENERAL ENGINEERING
8780 19TH ST
BOX #298
ALTA LOMA, CA 91701

JOB BID DATE AND TIME AGENCY

NIA N/A N/A

ORDER QTY DESCRIPTION

METER PROVIED BY CITY
OPTIONAL" (IF CITY ELECTS TO

REPLACE)
30ea DFWPW6C4-12-BODY
16 5/16 x 31 3/4 x 12 H DFW METER

BOX ONLY
30ea DFWPW6C-4F _6450_NHK-LID
30 1/2 X 17 5/8 DFW LID
30ea E1301X2.63
1" X 2 5/8" JJ NL MTR CPLG
1ea E1900W1
1" JJ NL FIP X FIP B CURB LW
30ea DOMBN1X3
1" X 3" DOMESTIC BRASS NIPPLE
30ea BU1
1" NL BRASS UNION
30ea DOMBN1X12
1" X 12" DOMESTIC BRASS NIPPLE
ABANDONMENTS:
1ea HY867-56-06165-16
6" HYMAX GRIP END CAP (6.50-7.20)
NP T2 232PSI
Quotation

QUOTATION DATE QUOTE NUMBER
07/27/2022 S1058081
JOB NAME PAGE No. l 7 of 7
SHIP TO:

AUGUSTINE GENERAL ENGINEERING

BURN BRAE, CYPRESS POINT, OAKLAND

HILLS WATERLINE REPLACEMENT
AL TA LOMA, CA 91701
WRITER

LUCY SANCHEZ

UNIT PRICE
167.614/ea
146.829/ea

22.567/ea
133.977/ea

7.000/ea

75.350/ea

25.000/ea
293.981/ea

EXT PRICE
5028.42
4404.87
677.01
133.98
210.00
2260.50
750.00
293.98
***THANK YOU FOR THE OPPORTUNITY TO BID!*** Subtotal
S&H Charges
Estimated Tax
125235.08

0.00 9705.72
Amount Due 134940.80