CA\DD\07000.35100\10273509.2
RESOLUTION NO. 2022-118
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CORONA, CALIFORNIA, AMENDING THE CITYWIDE
MASTER FEE RECOVERY SCHEDULE
WHEREAS, Corona Municipal Code Section 3.02.040 provides that the City Council shall adopt a fee and services schedule and percentage of cost recovery by resolution; and WHEREAS, on March 16, 2022, the City Council adopted Resolution No. 2022-021 to update the fees set forth in the Citywide Master Fee Recovery Schedule (excluding Community Services’ fees); and
WHEREAS, on November 20, 2018, the City Council adopted Resolution No. 2018-125 to update the fees set forth in the Citywide Master Fee Recovery Schedule (excluding all building related fees); and
WHEREAS, the City Council desires to amend the Master Fee Recovery Schedule to do the following: (1) add a column titled “Fee Discount/Waiver (CMC 3.02)” and identify the specific fees to which the fee discounts and waivers provided for in CMC Sections 3.02.080 and
3.02.090 apply; and (2) amend the Public Improvement Plan Check Fee (PW-190); and WHEREAS, the fees adopted by this Resolution include California Proposition 26 Article XII C Section 1(e) exemption categories.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF CORONA, CALIFORNIA, AS FOLLOWS:
SECTION 1. Amendment of Master Fee Recovery Schedule. The Master Fee Recovery Schedule, adopted pursuant to Resolution No. 2018-125 and 2022-021, is hereby revised and updated to amend and establish the fees and charges and the corresponding cost recovery percentages set forth in Exhibit 1 attached hereto and incorporated herein by reference.
SECTION 2. CEQA Findings. The resolution is exempt pursuant to Section 15273(a) of the Guidelines for the California Environmental Quality Act (CEQA), which states that CEQA does not apply to the establishment, modification, or approval of rates, tolls, fares and other charges that are for the purpose of meeting operating expenses. This action updates certain fees that are established for the purpose of meeting the operating expenses of the City in providing the services performed specifically at the request of the applicant. Therefore, this action is exempt from CEQA and not further environmental analysis is required.
SECTION 3. Effective Date of Fee Updates. The Mayor shall sign the Resolution and the City Clerk attest thereto, and this Resolution shall take effect and be in force for immediate approval on December 7, 2022; provided, however, that footnotes 1 and 3 noted in the fee discount/waiver column shall not be effective until the effective date of Ordinance 3356 which implements them.
PASSED, APPROVED AND ADOPTED this 7th day of December, 2022.
CA\DD\07000.35100\10273509.2
2 Mayor of the City of Corona, California
ATTEST:
City Clerk of the City of Corona, California
CA\DD\07000.35100\10273509.2
3 CERTIFICATION
I, Sylvia Edwards, City Clerk of the City of Corona, California, do hereby certify that the foregoing Resolution was regularly passed and adopted by the City Council of the City of Corona, California, at a regular meeting thereof held on the 7th day of December, 2022 by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Corona, California, this 7th day of December, 2022.
City Clerk of the City of Corona, California
[SEAL]
CA\DD\07000.35100\10273509.2
4 EXHIBIT 1
AMENDED PORTIONS OF MASTER FEE RECOVERY SCHEDULE
[SEE ATTACHED 39 PAGES]
PLANNING DIVISION
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
1 1 PL-BZ-010 Ancillary Game Arcade Review Flat Fee $ 1,057 100% Plus Scanning Fee 56
1 1 PL-BZ-030 Cul-de-Sac Waiver Flat Fee 663 100%
Plus Scanning Fee 56
1 1 PL-BZ-045 Conditional Use Permit - Minor Flat Fee 2,980 100% Plus Scanning Fee 56
1 1 PL-BZ-070 Model Home Permit Review Flat Fee 1,447 100% Plus Scanning Fee 56
1 1 PL-BZ-080 Moved Building Review Flat Fee 2,696 50 - 100% Plus Scanning Fee 56
Moved Historic Building Review at 50% of Fee 1,348
Moved Historic Building Scanning Fee at 50% of Fee 23
1 1 PL-BZ-090 Non-Conforming Building Review Flat Fee 1,235 100% Plus Scanning Fee 56
1 1 PL-BZ-100 Parcel Map Waiver Review Flat Fee 2,962 100% Plus Scanning Fee 56
2 1 PL-BZ-130 Special Use Permit Flat Fee 100%
New 1,143
Renewal 446
1 1 PL-BZ-140 Medical Office in Residential Zone Review Flat Fee 1,175 100% Plus Scanning Fee 56
1 1 PL-BZ-150 Certificate of Compliance Review Flat Fee 2,397 100% Plus Scanning Fee 56
1 1 PL-BZ-170 Tentative Tract Map Rephasing Review Flat Fee 2,045 100% 1 1 PL-BZ-180 Film Permit Review Flat Fee 883 100%
1 1 PL-BZ-190 Telecommunications Facilities Review Flat Fee 1,179 100% Plus Scanning Fee 56
Plus per application if Maintenance Services is involved 115 1 2 PL-BZ-200 Public Notice Fee for Minor CUPs Flat Fee 131 100% 1 1 PL-CC-010 Agricultural Preserve Cancellation Flat Fee 1,872 100% Plus Scanning Fee 56
Plus Digitized Mapping Per Acre - Less than 50 Acres 246 Plus Digitized Mapping Per Acre - 50 Acres or More 588
1 1 PL-CC-020 Amended Map Review Flat Fee 4,516 100%
Plus Scanning Fee 56
1 1 PL-CC-040 Density Bonus Agreement Review Flat Fee 1,451 100% Plus Scanning Fee 56
1 1 PL-CC-070 Study Review Deposit + Full Cost Deposit + Full Cost 100% Deposit with Charges at Full Cost
1 1 PL-CC-090 Historic Property Preservation Flat Fee 2,082 100% Plus Scanning Fee 56
Plus Recording Fee for Land Current Fee
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
PLANNING DIVISION
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
1 1 PL-DP-010 Minor Specific Plan Amendment DPR Flat Fee 3,230 100% 1 1 PL-DP-011 Major Specific Plan Amendment DPR Flat Fee 6,937 100% 1 1 PL-DP-012 Specific Plan DPR Flat Fee 14,706 100%
1 1 PL-DP-020 Tentative Tract Map DPR Base Fee 6,172 100% Plus per Lot Per Lot 15
1 1 PL-DP-030 Parcel Map DPR Flat Fee 4,506 100%
1 1 PL-DP-050 Multi Unit Development Plan Review Base Fee 5,536 100% Plus per Dwelling Unit Per Dwelling Unit 15 100%
1 1 PL-DP-060 Commercial / Industrial / All Other Plan DPR Flat Fee 4,369 100% 1 1 PL-DP-070 Parcel Map / Tract Map Extension of Time DPR Flat Fee 2,322 100% 1 1 PL-DP-150 Extension of Time DPR Flat Fee 663 100%
1 1 PL-MS-010 Banner Review Flat Fee 56 100%
1 3 PL-MS-020 Garage Sale Permit Flat Fee 10 18%
Up to 3 Days
1 6 PL-MS-060 Promotional Construction Sign Permit Review Flat Fee 56 100% 1 1 PL-MS-080 Sign Permit Review Flat Fee 84 100%
1 1 PL-MS-090 Removal of Illegal Sign Flat Fee 156 100% Per Sign
1 2 PL-MS-100 Title Company Zoning Letters Flat Fee 233 100% Per Request
1 1 PL-MS-140 Sign Reface Review Flat Fee 28 100%
1 1 PL-MS-150 Substantial Conformance Review Flat Fee 1,720 100% 1 1 PL-MS-160 Minor Modification (Precise Plan) Flat Fee 1,339 100% Plus Scanning Fee 56
1 3 PL-MS-170 Code Enforcement Re-inspection Flat Fee 235 100% Per inspection for every inspection after the first two inspections 1 1 PL-MS-175 Public Notice Sign Processing Flat Fee 155 100% Per Application
1 1 PL-MS-180 Digitized Mapping Flat Fee 100%
Per Acre - Less than 50 Acres 246
Per Acre - 50 Acres or More 588
1 1 PL-MS-190 Scanning Services Flat Fee 56 100%
Scanning the plans and maps of new development
1 1 PL-MS-200 General Plan Maintenance 5% of Bldg Permit Fee 5% of Bldg Permit Fee 100% 1 1 PL-MS-210 Cottage Food Industry Permit Flat Fee 56 100%
PLANNING DIVISION
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
1 1 PL-MS-220 Planning Director Modification Flat Fee 1,134 100% CMC 16.12.070 - non substantive change in COA
1 1 PL-MS-230 Short Term Residential Rental Permit Flat Fee 56 100% 1 1 PL-MS-240 Short Term Residential Rental Permit Renewal Flat Fee 28 100% 1 1 PL-MS-250 Surface Mine Annual Inspections Deposit + Full Cost Deposit + Full Cost 100% 1 1 PL-PC-010 Annexation Request Review Deposit + Full Cost 100% Deposit with Charges at Full Cost Deposit + Full Cost
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-015 Community Facility Plan Amendment Flat Fee 4,200 100% Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-020 Architectural Review Flat Fee 2,776 100%
Plus Scanning Fee 56
1 1 PL-PC-030 Change of Zone Review Flat Fee 5,696 100% Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-040 Conditional Use Permit - Major Flat Fee 7,201 100% Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-050 Modification to Major CUP Flat Fee 4,194 100% Plus Scanning Fee 56
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee 1 1 PL-PC-060 Development Agreement Review Deposit + Full Cost 100% Deposit with Charges at Full Cost Deposit + Full Cost
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee 1 1 PL-PC-065 Environmental Categorial Exemption Flat Fee 265 100% 1 1 PL-PC-070 Environmental Impact Assessment Flat Fee 7,512 100% Plus Cost of Legal Ad Current Fee
1 1 PL-PC-075 Environmental Impact Report Review - Deposit + Full Cost 100% Deposit set at 30% of contract amount with charges at full cost Deposit + Full Cost Plus Cost of Legal Ad Current Fee
1 1 PL-PC-080 General Plan Amendment Review Base Fee 7,488 100% Plus per Acre Per Acre 16
Plus Digitized Mapping Per Acre - Less than 50 Acres 246 Plus Digitized Mapping Per Acre - 50 Acres or More 588
Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-110 Residential Parcel Map Review Flat Fee 5,917 100% Plus Scanning Fee 56
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee 1 1 PL-PC-120 Commercial / Industrial Parcel Map Review Flat Fee 7,188 100% Plus Scanning Fee 56
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee
PLANNING DIVISION
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
1 1 PL-PC-150 Precise Plan Review Base Fee 7,884 100%
Plus per Dwelling Unit Per Dwelling Unit 15
Plus Scanning Fee 56
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee 1 1 PL-PC-160 Precise Plan Modification Review Base Fee 5,449 100% Plus per Dwelling Unit Per Dwelling Unit 100% 15
Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-170 Reversion to Acreage Flat Fee 6,493 100%
Plus Scanning Fee 56
1 1 PL-PC-180 Similar Use Review Flat Fee 2,180 100%
Plus Scanning Fee 56
1 1 PL-PC-190 Specific Plan Review - deposit with charges at full cost Deposit + Full Cost 100% Deposit with Charges at Full Cost Deposit + Full Cost
Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-200 Specific Plan Amendment Review - minor revision Flat Fee 100% Minor Revision 4,996
Major Revision 8,476
Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-230 Sphere of Influence Amendment Deposit + Full Cost 100% Deposit with Charges at Full Cost Deposit + Full Cost
Plus Digitized Mapping Per Acre - Less than 50 Acres 246 Plus Digitized Mapping Per Acre - 50 Acres or More 588
Plus Scanning Fee 56
1 1 PL-PC-240 Surface Mining Permit Deposit + Full Cost 100% Deposit with Charges at Full Cost Deposit + Full Cost
Plus Digitized Mapping Per Acre - Less than 50 Acres 246 Plus Digitized Mapping Per Acre - 50 Acres or More 588
Plus Scanning Fee 56
1 1 PL-PC-245 Surface Mining Reclamation Plan Deposit + Full Cost 100% Deposit with Charges at Full Cost Deposit + Full Cost
Plus Digitized Mapping Per Acre - Less than 50 Acres 246 Plus Digitized Mapping Per Acre - 50 Acres or More 588
Plus Scanning Fee 56
1 1 PL-PC-250 Tentative Tract Map Review Base Fee 10,481 100% Plus per Lot Per Lot 35
Plus Scanning Fee 56
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee 1 1 PL-PC-270 Resubmitted Parcel Map Flat Fee 4,824 100% Plus Scanning Fee 56
1 1 PL-PC-280 Resubmitted Tract Map Review Base Fee 5,791 100% Plus per Lot Per Lot 35
Plus Scanning Fee 56
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee
PLANNING DIVISION
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
1 1 PL-PC-290 Major Variance Review Base Fee 5,512 100% Plus per Lot Per Lot 20
Plus Scanning Fee 56
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee 1 1 PL-PC-300 Waiver or Modification Review Flat Fee 2,265 100% 1 1 PL-PC-310 Zone Text Amendment Review Flat Fee 5,252 100% Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-PC-340 Appeal to the Planning Commission Flat Fee 3,190 100% 1 1 PL-PC-350 Extension of Time - PP Flat Fee 2,263 100% 1 1 PL-PC-360 Extension of Time - CUP Flat Fee 2,263 100% 1 1 PL-PC-370 Historic Resource Nomination Flat Fee 300 10% Plus Scanning Fee 56
Plus Cost of Legal Ad Current Fee
1 1 PL-ZA-010 Alcoholic Beverage Application Review Flat Fee 926 100% Plus Scanning Fee 56
1 1 PL-ZA-060 Minor Variance Review Flat Fee 2,101 100% Plus Scanning Fee 56
1 1 PL-ZA-070 Parking Determination Review Flat Fee 1,913 100% Plus Scanning Fee 56
1 1 PL-ZA-080 Commercial / Industrial Freeway Sign Review Flat Fee 1,142 100% Plus Scanning Fee 56
1 1 PL-ZA-090 Temporary Use Permit Flat Fee 56 100%
1 1 PL-ZA-100 Zoning Administrator Application Flat Fee 1,142 100% Plus Scanning Fee 56
1 1 PL-ZA-120 Adult Use Planning Permit Flat Fee 5,468 100% Plus Scanning Fee 56
1 1 PL-ZA-130 Minor Modifications to Telecommunication Facilities Flat Fee 678 100% 1 1 PL-ZA-140 Donation Collection Container Permit Flat Fee 182 100% 1 1 PL-ZA-150 Smoking Lounges Ancillary Use Application Fee Flat Fee 442 100% Fee Discount / Waiver Notes:
1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).
2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).
3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
PUBLIC WORKS
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
1 2 PW-010 Processing Alley/Street Vacations - Summary Flat Fee 100% Summary $ 2,233
Plus legal public fee Current Fee
Plus county filing fee Current Fee
Standard 3,229
Plus legal public fee Current Fee
Plus county filing fee Current Fee
1 2 PW-045 Minor Plan Check Revision Flat Fee 1,428 100% 3 2 PW-095 Utility Services Encroach Permit Flat Fee 100% Annual Blanket Permit 104
Blanket Permit Inspection, per day 143
New Construction - Plan Check 622
New Construction - Inspection, per day 291
New Construction - Permit Inspection, per day 291
Permit fees will double if inspection is not notified prior to working or if the work is not permitted.
1/3 6 PW-100 Erosion Control Plan Check Flat Fee 100%
10 Acres or Less 763
10 to 50 Acres 1,358
Over 50 Acres (base, plus $3 per each acre over 50) 1,909 Plus scanning fee, per sheet 27
1 6 PW-110 Parcel Map Plan Check Fee + Deposit 3,264 100% Plus scanning fee, per sheet 27
Deposit with charges at set fee
1 6 PW-120 Tract Map Plan Check Fee + Deposit 5,162 100% Plus scanning fee, per sheet 27
Deposit with charges at set fee
1/3 6 PW-160 Grading Inspection Flat Fee 100%
101-1,000 CY 759
Plus each additional 250 CY up to 5,000 CY 158
Plus each additional 1,000 CY over 5,000 CY 63
Per CMC 15.36.030
Or deposit with charges at actual costs if using outside services for inspections
1/3 6 PW-180 Precise Grading Plan Check Flat Fee 100%
Single Family Residence , less than 1,000 CY and 1 Acre 3,777 One Residential Building above limits 4,717
All Others less than 1 acre (Base Fee) 6,931
All Others Base Fee plus per Acre, 1-5 Acres Per Acre 1,065 All Others Base Fee Plus 5 Acres, Plus Per Acre more than 5 Acres Per Acre 652
All Others 1-5,000 CY 6,990
All Others 5,000 - 15,000 CY (Prop. 50,000 limit) 9,390 All Others more than 15,000 CY (plus $5 per 1,000 CY) (Prop. >50,000) 9,793
Plus scanning fee, per sheet 27
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
PUBLIC WORKS
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
1/3 6 PW-190* Public Improvement Plan Check
Base Fee + % of
Valuation 100%
Base/Minimum Fee (Proposed Fee Amount: $1,700) -
$0-$20K 20%
$20,001-$100k 3.50%
$100,001-$500K 2.5%
Over $500k 1%
Plus scanning fee, per sheet 27
Public Improvement Plan Check - Traffic
TS/Comm/etc. 1-3 sht Flat Fee 3,714
TS/Comm/etc. 3-6 sht Flat Fee 7,240
1 2 PW-220 Lot Line Adjustment Flat Fee 100%
Up to 2 lots 3,423
Over 2 lots 3,618
Plus per lot over 2 lots 1,104
Plus scanning fee, per sheet 27
3 6 PW-230 Right of Way Construction Inspection Flat Fee 100% Permit Issuance 54
Driveway - Residential 111
Driveway - Commercial 206
Sidewalk - 0 to 100 SF 153
Sidewalk - 101 to 1,000 SF 238
Sidewalk - 1,001 SF or More 301
Plus per SF Over 1,001 0.10
Surface Repair - 0-100 SF 161
Surface Repair - 101 - 1,000 SF 556
Surface Repair - 1,001 SF or More 683
Plus per SF Over 1,001 0.05
Curb Drain 79
Temporary Construction Material 79
Monitoring Well 256
Crane Operation 256
Other 126
3 2 PW-233 Utility Service Encroach Plan Check Flat Fee 141 100% Plus per sheet 184
1 2 PW-270 Stockpile / Borrow Site Permit Flat Fee 1,685 100% 1 6 PW-301 Public Drain Improvement Inspection Fee + Percentage 100% $2,000 - $100,000 Valuation 954
Plus percentage of valuation amount over $2,000 up to $100,000 15.23% $100,001 - $500,000 Valuation 14,397
Plus percentage of valuation amount over $100,000 up to $500,000 1.50% Over $500,000 Valuation and Over 19,865
Plus percentage of valuation amount over $500,001 1.00% 1 6 PW-302 Private Drain Improvement Inspection Fee + Percentage 100% $2,000 - $100,000 Valuation 649
Plus percentage of valuation amount over $2,000 up to $100,000 15.77% $100,001 - $500,000 Valuation 14,220
Plus percentage of valuation amount over $100,000 up to $500,000 1.49% $500,001 Valuation and Over 19,471
Plus percentage of valuation amount over $500,001 1.10% 1 2 PW-305 Waiver of Improvement Requirements Flat Fee 830 100% *Fee Currently does not include a base/minimum fee. Proposing to include a base/minimum fee in the amount of $1,700. Fee will be charged as follows: Base Fee + % of Valuation.
PUBLIC WORKS
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
1 2 PW-360 Stockpile Plan Check Flat Fee 2,327 100%
Plus scanning fee, per sheet 27
1 2 PW-370 Landscape and Irrigation Plan Review (LMD) Fee + Deposit 2,912 100% Plus scanning fee, per sheet 27
Deposit with charges at set fee
1 2 PW-480 Water Quality Management Plan Review Flat Fee 3,337 100% 1 2 PW-485 Revised Water Quality Management Plan Check Flat Fee 1,147 100% 1 2 PW-490 Water Quality Management Plan Inspection Flat Fee 763 100% 1 6 PW-510 Deferral / Waiver of Impact Fees Flat Fee 1,877 100% Plus actual cost for legal review and advertising (if set for public hearing) Full Cost 1 2 PW-511 Waiver of Permits Fee Request Flat Fee 931 100% 1 1 PW-540 Bond Substitution Flat Fee 1,361 100%
1 1 PW-550 Bond Reduction Flat Fee 1,735 100%
1 2 PW-610 Retaining Wall Plan Check Fee + Deposit 1,878 100% Deposit with charges at set fee
1 2 PW-660 Plan Check Time Extension Fee Flat Fee 925 100% 3 2 PW-1005 Address Issuance Flat Fee 100%
Per Address, 1-5 (Base Fee) 472
Base Fee, plus per address, 6-40 34
Base Fee, plus 40 addresses, plus per address, 41-150 19 Base Fee, plus 150 addresses, plus per address, over 150 9 3 2 PW-1015 Traffic Control Plan Review Flat Fee 100%
Preliminary Review (MUTCD/WATCH) 93
Minor with Plans (Utility) 713
Major - TCP (1-5 sheets) 1,350
Major - TCP (6-20 sheets) 2,901
Major - TCP (>20 sheets) 5,078
3 2 PW-1025 Fire Flow Report Flat Fee 335 100%
Fee Discount / Waiver Notes:
2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).
3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).
FIRE DEPARTMENT
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
2 3 FR-060 Special Fire Permit Inspection Per Inspection 175 100% Late Payment Fee - 30+ Days Penalty 75
2 3 FR-070 Fire Prevention Division Inspection Per Inspection 50 - 100% A1 & A4 Occupancies 250
A1 & A4 Occupancies - CUPA Program Discount 125
A2 & A3 Occupancies 155
A2 & A3 Occupancies - CUPA Program Discount 80
E Occupancies 1-100 Students 180
E Occupancies 1-100 Students - CUPA Program Discount 90 E Occupancies 101-999 Students 270
E Occupancies 101-999 Students - CUPA Program Discount 135 E Occupancies 1,000-3,000 Students 365
E Occupancies 1,000-3,000 Students - CUPA Program Discount 180 E Occupancies 3,001+ Students 595
E Occupancies 3,001+ Students - CUPA Program Discount 300 I Occupancies (except I2) 270
I Occupancies (except I2) - CUPA Program Discount 135
I2 Occupancies 640
I2 Occupancies - CUPA Program Discount 320
B, M & U Occupancies 1-5,000 SF 135
B, M & U Occupancies 1-5,000 SF - CUPA Program Discount 65 B, M & U Occupancies 5,001-10,000 SF 180
B, M & U Occupancies 5,001-10,000 SF - CUPA Program Discount 90 B, M & U Occupancies 10,001+ SF 270
B, M & U Occupancies 10,001+ SF - CUPA Program Discount 135 F, H & S Occupancies 1-5,000 SF 180
F, H & S Occupancies 1-5,000 SF - CUPA Program Discount 90 F, H & S Occupancies 5,001-100,000 SF 270
F, H & S Occupancies 5,001-100,000 SF - CUPA Program Discount 135 F, H & S Occupancies 100,001-300,000 SF 365
F, H & S Occupancies 100,001-300,000 SF - CUPA Program Discount 180 F, H & S Occupancies 300,001+ SF 455
F, H & S Occupancies 300,001+ SF - CUPA Program Discount 230 Multi-Family Residential - Housing Unit Fire Inspection Fees Per Calendar Year:
3-4 Units 210
3-4 Units - CUPA Program Discount 105
5-9 Units 395
5-9 Units - CUPA Program Discount 200
10-49 Units 535
10-49 Units - CUPA Program Discount 265
50-99 Units 765
50-99 Units - CUPA Program Discount 385
100-199 Units 1,045
100-199 Units - CUPA Program Discount 520
200-299 Units 1,180
200-299 Units - CUPA Program Discount 590
300-399 Units 1,320
300-399 Units - CUPA Program Discount 660
400-499 Units 1,460
400-499 Units - CUPA Program Discount 730
500-599 Units 1,690
500-599 Units - CUPA Program Discount 845
600+ Units 2,105
600+ Units - CUPA Program Discount 1,055
Per Health and Safety Code section 13146 standard
Multi-Family Residential - Housing Unit Fire Inspection Fees
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
FIRE DEPARTMENT
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
FR-070 (cont.) Per Calendar Year:
Common Area Fire Inspection 440
Common Area Fire Inspection - CUPA Program Discount 220 Per Health and Safety Code section 13146 standard
1/3 1/6 FR-250 New Sprinkler Plan Check / Inspection 100% Plan Check: Per Plan Check
1 - 100 Heads 395
101 - 500 Heads 445
501+ Heads 495
PC Phasing, each additional model, 1-100 heads 20% of PC Fee 85 Inspection: Per 2 Inspections
1 - 100 Heads 505
101 - 500 Heads 595
501+ Heads 710
After 2nd Inspection - Original Fee
1 1/6 FR-255 FR-255 TI Sprinkler Plan Check / Inspection 100% Plan Check: Per Plan Check
1 - 20 Heads 260
21 - 100 Heads 310
101+ Heads 410
PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
1 - 20 Heads 240
21 - 100 Heads 475
100+ Heads 595
After 2nd Inspection - Original Fee
1 1/6 FR-257 Underground Fire Line Plan Check / Inspection 100% Plan Check: Per Plan Check
0 - 500 linear feet 350
501 - 1,000 linear feet 450
1,000+ linear feet 550
PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
0-500 linear feet 535
501-1,000 linear feet 770
1,000+ linear feet 1,000
After 2nd Inspection - Original Fee
1 1/6 FR-260 High Pile Storage Plan Check Per Plan Check 100% 0 - 500 square feet 300
501 - 2,500 square feet 350
2,501 - 20,000 square feet 400
20,001 - 500,000 square feet 500
500,001+ square feet 550
1 1/6 FR-270 Fire Alarm Plan Check / Inspection 100%
Plan Check: Per Plan Check
Over the Counter 200
Standard 450
PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
Over the Counter 215
Standard 390
Plus Each Device Over 9, per device 6
After 2nd Inspection - Original Fee
Waterflow Monitoring
Plan Check Per Plan Check 300
Inspection Per Inspection 270
FIRE DEPARTMENT
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
1 1/6 FR-280 Fire Suppression System Plan Check / Inspection 100% Plan Check: Per Plan Check
Over the Counter 200
Standard 300
PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
Over the Counter 215
Standard 270
After 2nd Inspection - Original Fee
1 2 FR-410 Expired Permit / Extension Per Extension 115 100% 1 1 FR-420 Expedited Plan Check
1.5x Regular
Plan Check Fee
1.5x Regular
Plan Check Fee 100%
Fee Discount / Waiver Notes:
2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).
3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).
BUILDING DIVISION
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
1/3 6 BL-010 Building and Other Inspection Flat Fee 100% Building Inspection Table A
Miscellaneous Inspection Table B
Plumbing Inspection Table C
Electrical Inspection Table D
Mechanical Inspection Table E
Tenant Improvement Table F
Minimum 123
1/3 6 BL-020 Building Plan Checking Flat Fee 100%
Building Plan Check Table A
Miscellaneous Plan Check Table B
Plumbing Plan Check Table C
Electrical Plan Check Table D
Mechanical Plan Check Table E
Tenant Improvement Table F
Minimum 123
After 3 plan checks, each plan check charged at the fully allocated hourly rate for all staff involved plus any outside costs. Full Cost 1/3 6 BL-030 Building Occupancy Inspection Flat Fee 683 100% 1 6 BL-035 Tenant Occupancy Inspection Flat Fee 604 100% 1 6 BL-036 Post Occupancy Inspection Flat Fee 267 100%
1 6 BL-037 Mobile Home Park Cert of Occupancy Flat Fee 170 100% 1 6 BL-070 Post Fire Building Inspection Flat Fee 842 100% 1 6 BL-080 Special Building Inspection / Re-Inspection Deposit + Full Cost Deposit + Full Cost 100% Deposit with charges at Full Cost
1 6 BL-100 Temporary Connection of Utilities Fee + Deposit 347 100% Plus guarantee deposit per agreement 2,000
Deposit is forfeited if terms of the agreement are not met 1/3 6 BL-130 Landscape Plan Check Flat Fee 100%
Fence & Wall Review 969
Front Yard Review 681
Plus actual contracted costs Actual Cost
HOA, Slopes, Fuel Modification Review 1,012
Plus actual contracted costs Actual Cost
Model Home Review 816
Plus actual contracted costs Actual Cost
Commercial/Industrial Review 816
Plus actual contracted costs Actual Cost
City Park Review 931
Minimum 123
1 2 BL-150 OSHPD3 Certification Flat Fee 109 100%
1 2 BL-160 Building Permit/Plan Extension Flat Fee 76 100% 1 2 BL-170 Recordation Fee Actual Cost Actual Cost 100% 1 2 BL-180 Fee for all other services not identified above Per Hour 149 100% 1 2 BL-190 Request for Duplication of Plans Fee Flat Fee 56 100%
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
BUILDING DIVISION
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption Reference Number Service Name Fee Description Current Fee Recovery
Level
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
1 2 BL-200 Additional Plan Checks Flat Fee 147 100%
1 2 BL-220 Temporary Certificate of Occupancy Fee + Deposit 100% SFR and TI's 2,000 sq ft or less $1,707 + $2,000 Deposit TI's 2,000-5,000 sq ft $1,707 + $5,000 Deposit
All others and TI's over 5,000 sq ft
$1,707 + $10,000
Deposit
Fee Discount / Waiver Notes:
2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).
3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).
BUILDING DIVISION ‐ Table A: New Construction
Service Name Current Fee Current Fee
A‐1 Theater 1,000 s.f. I‐A, I‐B, II‐A $ 1, 6,969.10 $ 568.90 A‐1 Theater 1,000 s.f. II‐B, III‐A, V‐A 1, 5,807.58 307.42 A‐1 Theater 1,000 s.f. III‐B, IV, V‐B 1, 4,646.07 045.94 A‐1 Theater 5,000 s.f. I‐A, I‐B, II‐A 3, 10,814.12 137.81 A‐1 Theater 5,000 s.f. II‐B, III‐A, V‐A 2, 9,011.77 614.84 A‐1 Theater 5,000 s.f. III‐B, IV, V‐B 2, 7,209.41 091.87 A‐1 Theater 10,000 s.f. I‐A, I‐B, II‐A 5, 11,294.75 334.27 A‐1 Theater 10,000 s.f. II‐B, III‐A, V‐A 4, 9,412.29 445.23 A‐1 Theater 10,000 s.f. III‐B, IV, V‐B 3, 7,529.83 556.18 A‐1 Theater 20,000 s.f. I‐A, I‐B, II‐A 7, 12,976.94 687.62 A‐1 Theater 20,000 s.f. II‐B, III‐A, V‐A 6, 10,814.12 406.35 A‐1 Theater 20,000 s.f. III‐B, IV, V‐B 5, 8,651.30 125.08 A‐1 Theater 50,000 s.f. I‐A, I‐B, II‐A 9, 16,581.65 256.53 A‐1 Theater 50,000 s.f. II‐B, III‐A, V‐A 7, 13,818.04 713.77 A‐1 Theater 50,000 s.f. III‐B, IV, V‐B 6, 11,054.43 171.02 A‐1 Theater 100,000 s.f. I‐A, I‐B, II‐A 10, 23,070.12 982.32 A‐1 Theater 100,000 s.f. II‐B, III‐A, V‐A 9, 19,225.10 151.93 A‐1 Theater 100,000 s.f. III‐B, IV, V‐B 7, 15,380.08 321.55 A‐2 Nightclub 1,000 s.f. I‐A, I‐B, II‐A 1, 6,488.47 255.12 A‐2 Nightclub 1,000 s.f. II‐B, III‐A, V‐A 1, 5,407.06 045.94 A‐2 Nightclub 1,000 s.f. III‐B, IV, V‐B 4,325.65 836.75 A‐2 Nightclub 5,000 s.f. I‐A, I‐B, II‐A 10,573.81 2,667.14 A‐2 Nightclub 5,000 s.f. II‐B, III‐A, V‐A 8,811.50 2,222.61 A‐2 Nightclub 5,000 s.f. III‐B, IV, V‐B 7,049.20 1,778.09 A‐2 Nightclub 10,000 s.f. I‐A, I‐B, II‐A 10,814.12 4,706.71 A‐2 Nightclub 10,000 s.f. II‐B, III‐A, V‐A 9,011.77 3,922.26 A‐2 Nightclub 10,000 s.f. III‐B, IV, V‐B 7,209.41 3,137.81 A‐2 Nightclub 20,000 s.f. I‐A, I‐B, II‐A 12,976.94 6,589.39 A‐2 Nightclub 20,000 s.f. II‐B, III‐A, V‐A 10,814.12 5,491.16 A‐2 Nightclub 20,000 s.f. III‐B, IV, V‐B 8,651.30 4,392.93 A‐2 Nightclub 50,000 s.f. I‐A, I‐B, II‐A 16,341.34 7,844.52 A‐2 Nightclub 50,000 s.f. II‐B, III‐A, V‐A 13,617.78 6,537.10 A‐2 Nightclub 50,000 s.f. III‐B, IV, V‐B 10,894.22 5,229.68 A‐2 Nightclub 100,000 s.f. I‐A, I‐B, II‐A 22,829.81 10,197.87 A‐2 Nightclub 100,000 s.f. II‐B, III‐A, V‐A 19,024.84 8,498.22 A‐2 Nightclub 100,000 s.f. III‐B, IV, V‐B 15,219.87 6,798.58 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. I‐A, I‐B, II‐A 7,930.35 1,412.01 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. II‐B, III‐A, V‐A 6,608.63 1,176.68 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. III‐B, IV, V‐B 5,286.90 941.34 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. I‐A, I‐B, II‐A 12,256.00 2,824.03 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. II‐B, III‐A, V‐A 10,213.33 2,353.35 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. III‐B, IV, V‐B 8,170.67 1,882.68 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. I‐A, I‐B, II‐A 12,736.63 5,020.49 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. II‐B, III‐A, V‐A 10,613.86 4,183.74 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. III‐B, IV, V‐B 8,491.09 3,346.99 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. I‐A, I‐B, II‐A 14,178.51 7,060.06 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. II‐B, III‐A, V‐A 11,815.43 5,883.39 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. III‐B, IV, V‐B 9,452.34 4,706.71 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. I‐A, I‐B, II‐A 17,062.28 8,472.08 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. II‐B, III‐A, V‐A 14,218.56 7,060.06 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. III‐B, IV, V‐B 11,374.85 5,648.05 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. I‐A, I‐B, II‐A 19,225.10 10,982.32 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. II‐B, III‐A, V‐A 16,020.92 9,151.93 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. III‐B, IV, V‐B 12,816.73 7,321.55 A‐4 Arena 5,000 s.f. I‐A, I‐B, II‐A 12,256.00 2,667.14 A‐4 Arena 5,000 s.f. II‐B, III‐A, V‐A 10,213.33 2,222.61 A‐4 Arena 5,000 s.f. III‐B, IV, V‐B 8,170.67 1,778.09 A‐4 Arena 10,000 s.f. I‐A, I‐B, II‐A 12,736.63 4,706.71 A‐4 Arena 10,000 s.f. II‐B, III‐A, V‐A 10,613.86 3,922.26 A‐4 Arena 10,000 s.f. III‐B, IV, V‐B 8,491.09 3,137.81 A‐4 Arena 20,000 s.f. I‐A, I‐B, II‐A 15,139.77 6,746.28 A‐4 Arena 20,000 s.f. II‐B, III‐A, V‐A 12,616.47 5,621.90 A‐4 Arena 20,000 s.f. III‐B, IV, V‐B 10,093.18 4,497.52 A‐4 Arena 50,000 s.f. I‐A, I‐B, II‐A 19,225.10 8,158.30 A‐4 Arena 50,000 s.f. II‐B, III‐A, V‐A 16,020.92 6,798.58 A‐4 Arena 50,000 s.f. III‐B, IV, V‐B 12,816.73 5,438.86 Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
BUILDING DIVISION ‐ Table A: New Construction
Service Name Current Fee Current Fee
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
A‐4 Arena 100,000 s.f. I‐A, I‐B, II‐A 10, 26,674.83 790.21 A‐4 Arena 100,000 s.f. II‐B, III‐A, V‐A 8, 22,229.02 991.84 A‐4 Arena 100,000 s.f. III‐B, IV, V‐B 7, 17,783.22 193.47 A‐5 Stadium 1,000 s.f. I‐A, I‐B, II‐A 1, 5,527.22 412.01 A‐5 Stadium 1,000 s.f. II‐B, III‐A, V‐A 1, 4,606.01 176.68 A‐5 Stadium 1,000 s.f. III‐B, IV, V‐B 3,684.81 941.34 A‐5 Stadium 5,000 s.f. I‐A, I‐B, II‐A 2, 8,410.98 667.14 A‐5 Stadium 5,000 s.f. II‐B, III‐A, V‐A 2, 7,009.15 222.61 A‐5 Stadium 5,000 s.f. III‐B, IV, V‐B 1, 5,607.32 778.09 A‐5 Stadium 10,000 s.f. I‐A, I‐B, II‐A 4, 8,651.30 706.71 A‐5 Stadium 10,000 s.f. II‐B, III‐A, V‐A 3, 7,209.41 922.26 A‐5 Stadium 10,000 s.f. III‐B, IV, V‐B 3, 5,767.53 137.81 A‐5 Stadium 20,000 s.f. I‐A, I‐B, II‐A 6, 10,093.18 746.28 A‐5 Stadium 20,000 s.f. II‐B, III‐A, V‐A 5, 8,410.98 621.90 A‐5 Stadium 20,000 s.f. III‐B, IV, V‐B 4, 6,728.79 497.52 A‐5 Stadium 50,000 s.f. I‐A, I‐B, II‐A 8, 12,736.63 158.30 A‐5 Stadium 50,000 s.f. II‐B, III‐A, V‐A 6, 10,613.86 798.58 A‐5 Stadium 50,000 s.f. III‐B, IV, V‐B 5, 8,491.09 438.86 A‐5 Stadium 100,000 s.f. I‐A, I‐B, II‐A 10, 14,418.83 668.54 A‐5 Stadium 100,000 s.f. II‐B, III‐A, V‐A 8, 12,015.69 890.45 A‐5 Stadium 100,000 s.f. III‐B, IV, V‐B 9,612.55 7,112.36 B Office 1,000 s.f. I‐A, I‐B, II‐A 9,372.24 1,725.79 B Office 1,000 s.f. II‐B, III‐A, V‐A 7,810.20 1,438.16 B Office 1,000 s.f. III‐B, IV, V‐B 6,248.16 1,150.53 B Office 5,000 s.f. I‐A, I‐B, II‐A 15,380.08 3,608.48 B Office 5,000 s.f. II‐B, III‐A, V‐A 12,816.73 3,007.06 B Office 5,000 s.f. III‐B, IV, V‐B 10,253.39 2,405.65 B Office 10,000 s.f. I‐A, I‐B, II‐A 15,860.71 6,275.61 B Office 10,000 s.f. II‐B, III‐A, V‐A 13,217.26 5,229.68 B Office 10,000 s.f. III‐B, IV, V‐B 10,573.81 4,183.74 B Office 20,000 s.f. I‐A, I‐B, II‐A 18,984.79 8,942.75 B Office 20,000 s.f. II‐B, III‐A, V‐A 15,820.66 7,452.29 B Office 20,000 s.f. III‐B, IV, V‐B 12,656.52 5,961.83 B Office 50,000 s.f. I‐A, I‐B, II‐A 23,791.06 10,825.43 B Office 50,000 s.f. II‐B, III‐A, V‐A 19,825.88 9,021.19 B Office 50,000 s.f. III‐B, IV, V‐B 15,860.71 7,216.95 B Office 10,000 s.f. I‐A, I‐B, II‐A 27,876.40 13,492.57 B Office 10,000 s.f. II‐B, III‐A, V‐A 23,230.33 11,243.81 B Office 10,000 s.f. III‐B, IV, V‐B 18,584.26 8,995.04 B Office 200,000 s.f. I‐A, I‐B, II‐A 49,264.32 24,161.11 B Office 200,000 s.f. II‐B, III‐A, V‐A 41,053.60 20,134.26 B Office 200,000 s.f. III‐B, IV, V‐B 32,842.88 16,107.40 B Office 500,000 s.f. I‐A, I‐B, II‐A 56,473.73 29,652.27 B Office 500,000 s.f. II‐B, III‐A, V‐A 47,061.44 24,710.22 B Office 500,000 s.f. III‐B, IV, V‐B 37,649.15 19,768.18 B Office 1,000,000 s.f. I‐A, I‐B, II‐A 79,784.17 37,967.45 B Office 1,000,000 s.f. II‐B, III‐A, V‐A 66,486.80 31,639.54 B Office 1,000,000 s.f. III‐B, IV, V‐B 53,189.44 25,311.64 B Medical Office 1,000 s.f. I‐A, I‐B, II‐A 9,852.86 1,725.79 B Medical Office 1,000 s.f. II‐B, III‐A, V‐A 8,210.72 1,438.16 B Medical Office 1,000 s.f. III‐B, IV, V‐B 6,568.58 1,150.53 B Medical Office 5,000 s.f. I‐A, I‐B, II‐A 15,860.71 3,608.48 B Medical Office 5,000 s.f. II‐B, III‐A, V‐A 13,217.26 3,007.06 B Medical Office 5,000 s.f. III‐B, IV, V‐B 10,573.81 2,405.65 B Medical Office 10,000 s.f. I‐A, I‐B, II‐A 16,341.34 6,275.61 B Medical Office 10,000 s.f. II‐B, III‐A, V‐A 13,617.78 5,229.68 B Medical Office 10,000 s.f. III‐B, IV, V‐B 10,894.22 4,183.74 B Medical Office 20,000 s.f. I‐A, I‐B, II‐A 19,465.41 9,099.64 B Medical Office 20,000 s.f. II‐B, III‐A, V‐A 16,221.18 7,583.03 B Medical Office 20,000 s.f. III‐B, IV, V‐B 12,976.94 6,066.43 B Medical Office 50,000 s.f. I‐A, I‐B, II‐A 24,271.69 10,825.43 B Medical Office 50,000 s.f. II‐B, III‐A, V‐A 20,226.41 9,021.19 B Medical Office 50,000 s.f. III‐B, IV, V‐B 16,181.13 7,216.95 B Medical Office 100,000 s.f. I‐A, I‐B, II‐A 34,605.18 13,021.90 B Medical Office 100,000 s.f. II‐B, III‐A, V‐A 28,837.65 10,851.58 B Medical Office 100,000 s.f. III‐B, IV, V‐B 23,070.12 8,681.26
BUILDING DIVISION ‐ Table A: New Construction
Service Name Current Fee Current Fee
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
B Restaurant <50 occupants 1,000 s.f. I‐A, I‐B, II‐A 8,170.67 2,824.03 B Restaurant <50 occupants 1,000 s.f. II‐B, III‐A, V‐A 6,808.89 2,353.35 B Restaurant <50 occupants 1,000 s.f. III‐B, IV, V‐B 5,447.11 1,882.68 B Restaurant <50 occupants 2,000 s.f. I‐A, I‐B, II‐A 10,093.18 3,294.70 B Restaurant <50 occupants 2,000 s.f. II‐B, III‐A, V‐A 8,410.98 2,745.58 B Restaurant <50 occupants 2,000 s.f. III‐B, IV, V‐B 6,728.79 2,196.46 B Restaurant <50 occupants 5,000 s.f. I‐A, I‐B, II‐A 11,535.06 4,392.93 B Restaurant <50 occupants 5,000 s.f. II‐B, III‐A, V‐A 9,612.55 3,660.77 B Restaurant <50 occupants 5,000 s.f. III‐B, IV, V‐B 7,690.04 2,928.62 B Restaurant <50 occupants 10,000 s.f. I‐A, I‐B, II‐A 13,697.88 10,511.65 B Restaurant <50 occupants 10,000 s.f. II‐B, III‐A, V‐A 11,414.90 8,759.71 B Restaurant <50 occupants 10,000 s.f. III‐B, IV, V‐B 9,131.92 7,007.77 E Educational 1,000 s.f. I‐A, I‐B, II‐A 7,209.41 1,255.12 E Educational 1,000 s.f. II‐B, III‐A, V‐A 6,007.84 1,045.94 E Educational 1,000 s.f. III‐B, IV, V‐B 4,806.28 836.75 E Educational 5,000 s.f. I‐A, I‐B, II‐A 10,814.12 2,667.14 E Educational 5,000 s.f. II‐B, III‐A, V‐A 9,011.77 2,222.61 E Educational 5,000 s.f. III‐B, IV, V‐B 7,209.41 1,778.09 E Educational 10,000 s.f. I‐A, I‐B, II‐A 11,294.75 4,706.71 E Educational 10,000 s.f. II‐B, III‐A, V‐A 9,412.29 3,922.26 E Educational 10,000 s.f. III‐B, IV, V‐B 7,529.83 3,137.81 E Educational 20,000 s.f. I‐A, I‐B, II‐A 13,457.57 6,746.28 E Educational 20,000 s.f. II‐B, III‐A, V‐A 11,214.64 5,621.90 E Educational 20,000 s.f. III‐B, IV, V‐B 8,971.71 4,497.52 E Educational 50,000 s.f. I‐A, I‐B, II‐A 17,062.28 8,001.41 E Educational 50,000 s.f. II‐B, III‐A, V‐A 14,218.56 6,667.84 E Educational 50,000 s.f. III‐B, IV, V‐B 11,374.85 5,334.27 E Educational 100,000 s.f. I‐A, I‐B, II‐A 23,791.06 10,354.76 E Educational 100,000 s.f. II‐B, III‐A, V‐A 19,825.88 8,628.97 E Educational 100,000 s.f. III‐B, IV, V‐B 15,860.71 6,903.17 F‐1, F‐2 Industrial, Moderate/Low Hazard 1,000 s.f. I‐A, I‐B, II‐A 6,248.16 1,255.12 F‐1, F‐2 Industrial, Moderate/Low Hazard 1,000 s.f. II‐B, III‐A, V‐A 5,206.80 1,045.94 F‐1, F‐2 Industrial, Moderate/Low Hazard 1,000 s.f. III‐B, IV, V‐B 4,165.44 836.75 F‐1, F‐2 Industrial, Moderate/Low Hazard 5,000 s.f. I‐A, I‐B, II‐A 9,372.24 2,667.14 F‐1, F‐2 Industrial, Moderate/Low Hazard 5,000 s.f. II‐B, III‐A, V‐A 7,810.20 2,222.61 F‐1, F‐2 Industrial, Moderate/Low Hazard 5,000 s.f. III‐B, IV, V‐B 6,248.16 1,778.09 F‐1, F‐2 Industrial, Moderate/Low Hazard 15,000 s.f. I‐A, I‐B, II‐A 9,852.86 4,706.71 F‐1, F‐2 Industrial, Moderate/Low Hazard 15,000 s.f. II‐B, III‐A, V‐A 8,210.72 3,922.26 F‐1, F‐2 Industrial, Moderate/Low Hazard 15,000 s.f. III‐B, IV, V‐B 6,568.58 3,137.81 F‐1, F‐2 Industrial, Moderate/Low Hazard 20,000 s.f. I‐A, I‐B, II‐A 11,535.06 5,804.94 F‐1, F‐2 Industrial, Moderate/Low Hazard 20,000 s.f. II‐B, III‐A, V‐A 9,612.55 4,837.45 F‐1, F‐2 Industrial, Moderate/Low Hazard 20,000 s.f. III‐B, IV, V‐B 7,690.04 3,869.96 F‐1, F‐2 Industrial, Moderate/Low Hazard 50,000 s.f. I‐A, I‐B, II‐A 13,697.88 6,746.28 F‐1, F‐2 Industrial, Moderate/Low Hazard 50,000 s.f. II‐B, III‐A, V‐A 11,414.90 5,621.90 F‐1, F‐2 Industrial, Moderate/Low Hazard 50,000 s.f. III‐B, IV, V‐B 9,131.92 4,497.52 F‐1, F‐2 Industrial, Moderate/Low Hazard 100,000 s.f. I‐A, I‐B, II‐A 14,418.83 8,942.75 F‐1, F‐2 Industrial, Moderate/Low Hazard 100,000 s.f. II‐B, III‐A, V‐A 12,015.69 7,452.29 F‐1, F‐2 Industrial, Moderate/Low Hazard 100,000 s.f. III‐B, IV, V‐B 9,612.55 5,961.83 S‐1, S‐2 Low/Mod Hazard Storage 1,000 s.f. I‐A, I‐B, II‐A 4,806.28 3,922.26 S‐1, S‐2 Low/Mod Hazard Storage 1,000 s.f. II‐B, III‐A, V‐A 4,005.23 3,268.55 S‐1, S‐2 Low/Mod Hazard Storage 1,000 s.f. III‐B, IV, V‐B 3,204.18 2,614.84 S‐1, S‐2 Low/Mod Hazard Storage 5,000 s.f. I‐A, I‐B, II‐A 7,209.41 5,177.38 S‐1, S‐2 Low/Mod Hazard Storage 5,000 s.f. II‐B, III‐A, V‐A 6,007.84 4,314.48 S‐1, S‐2 Low/Mod Hazard Storage 5,000 s.f. III‐B, IV, V‐B 4,806.28 3,451.59 S‐1, S‐2 Low/Mod Hazard Storage 10,000 s.f. I‐A, I‐B, II‐A 7,930.35 6,589.39 S‐1, S‐2 Low/Mod Hazard Storage 10,000 s.f. II‐B, III‐A, V‐A 6,608.63 5,491.16 S‐1, S‐2 Low/Mod Hazard Storage 10,000 s.f. III‐B, IV, V‐B 5,286.90 4,392.93 S‐1, S‐2 Low/Mod Hazard Storage 20,000 s.f. I‐A, I‐B, II‐A 8,651.30 8,628.97 S‐1, S‐2 Low/Mod Hazard Storage 20,000 s.f. II‐B, III‐A, V‐A 7,209.41 7,190.81 S‐1, S‐2 Low/Mod Hazard Storage 20,000 s.f. III‐B, IV, V‐B 5,767.53 5,752.64 S‐1, S‐2 Low/Mod Hazard Storage 50,000 s.f. I‐A, I‐B, II‐A 10,814.12 11,139.21 S‐1, S‐2 Low/Mod Hazard Storage 50,000 s.f. II‐B, III‐A, V‐A 9,011.77 9,282.68 S‐1, S‐2 Low/Mod Hazard Storage 50,000 s.f. III‐B, IV, V‐B 7,209.41 7,426.14 S‐1, S‐2 Low/Mod Hazard Storage 100,000 s.f., II‐B, III‐A, V‐A I‐A, I‐B, II‐A 15,620.39 14,590.80 S‐1, S‐2 Low/Mod Hazard Storage 100,000 s.f., II‐B, III‐A, V‐A II‐B, III‐A, V‐A 13,016.99 12,159.00 S‐1, S‐2 Low/Mod Hazard Storage 100,000 s.f., II‐B, III‐A, V‐A III‐B, IV, V‐B 10,413.60 9,727.20
BUILDING DIVISION ‐ Table A: New Construction
Service Name Current Fee Current Fee
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
S‐2 Parking Garage 5,000 s.f. I‐A, I‐B, II‐A 4, 7,690.04 706.71 S‐2 Parking Garage 5,000 s.f. II‐B, III‐A, V‐A 3, 6,408.37 922.26 S‐2 Parking Garage 5,000 s.f. III‐B, IV, V‐B 3, 5,126.69 137.81 S‐2 Parking Garage 10,000 s.f. I‐A, I‐B, II‐A 6, 11,775.37 118.72 S‐2 Parking Garage 10,000 s.f. II‐B, III‐A, V‐A 9,812.81 5, 098.93 S‐2 Parking Garage 10,000 s.f. III‐B, IV, V‐B 4, 7,850.25 079.15 S‐2 Parking Garage 50,000 s.f. I‐A, I‐B, II‐A 8, 12,256.00 001.41 S‐2 Parking Garage 50,000 s.f. II‐B, III‐A, V‐A 10,213.33 6, 667.84 S‐2 Parking Garage 50,000 s.f. III‐B, IV, V‐B 5, 8,170.67 334.27 S‐2 Parking Garage 100,000 s.f. I‐A, I‐B, II‐A 18,984.79 11, 923.66 S‐2 Parking Garage 100,000 s.f. II‐B, III‐A, V‐A 15,820.66 9, 936.39 S‐2 Parking Garage 100,000 s.f. III‐B, IV, V‐B 12,656.52 7, 949.11 S‐2 Parking Garage 500,000 s.f. I‐A, I‐B, II‐A 23,070.12 17, 885.49 S‐2 Parking Garage 500,000 s.f. II‐B, III‐A, V‐A 19,225.10 14, 904.58 S‐2 Parking Garage 500,000 s.f. III‐B, IV, V‐B 15,380.08 11, 923.66 S‐2 Parking Garage 1,000,000 s.f. I‐A, I‐B, II‐A 30,279.53 35, 770.99 S‐2 Parking Garage 1,000,000 s.f. II‐B, III‐A, V‐A 25,232.94 29, 809.16 S‐2 Parking Garage 1,000,000 s.f. III‐B, IV, V‐B 20,186.36 23,847.33 U Utility/Misc 500 s.f. I‐A, I‐B, II‐A 2,403.14 1,412.01 U Utility/Misc 500 s.f. II‐B, III‐A, V‐A 2,002.61 1,176.68 U Utility/Misc 500 s.f. III‐B, IV, V‐B 1,602.09 941.34 U Utility/Misc 2,000 s.f. I‐A, I‐B, II‐A 3,604.71 2,039.57 U Utility/Misc 2,000 s.f. II‐B, III‐A, V‐A 3,003.92 1,699.64 U Utility/Misc 2,000 s.f. III‐B, IV, V‐B 2,403.14 1,359.72 U Utility/Misc 4,000 s.f. I‐A, I‐B, II‐A 4,085.33 4,236.04 U Utility/Misc 4,000 s.f. II‐B, III‐A, V‐A 3,404.44 3,530.03 U Utility/Misc 4,000 s.f. III‐B, IV, V‐B 2,723.56 2,824.03 U Utility/Misc 8,000 s.f. I‐A, I‐B, II‐A 4,806.28 5,491.16 U Utility/Misc 8,000 s.f. II‐B, III‐A, V‐A 4,005.23 4,575.97 U Utility/Misc 8,000 s.f. III‐B, IV, V‐B 3,204.18 3,660.77 U Utility/Misc 20,000 s.f. I‐A, I‐B, II‐A 6,007.84 6,903.17 U Utility/Misc 20,000 s.f. II‐B, III‐A, V‐A 5,006.54 5,752.64 U Utility/Misc 20,000 s.f. III‐B, IV, V‐B 4,005.23 4,602.12 U Utility/Misc 40,000 s.f. I‐A, I‐B, II‐A 9,131.92 8,315.19 U Utility/Misc 40,000 s.f. II‐B, III‐A, V‐A 7,609.94 6,929.32 U Utility/Misc 40,000 s.f. III‐B, IV, V‐B 6,087.95 5,543.46 U Utility/Misc (Associated w R‐3 structures) 500 s.f. I‐A, I‐B, II‐A 961.26 627.56 U Utility/Misc (Associated w R‐3 structures) 500 s.f. II‐B, III‐A, V‐A 801.05 522.97 U Utility/Misc (Associated w R‐3 structures) 500 s.f. III‐B, IV, V‐B 640.84 418.37 U Utility/Misc (Associated w R‐3 structures) 2,000 s.f. I‐A, I‐B, II‐A 1,441.88 941.34 U Utility/Misc (Associated w R‐3 structures) 2,000 s.f. II‐B, III‐A, V‐A 1,201.57 784.45 U Utility/Misc (Associated w R‐3 structures) 2,000 s.f. III‐B, IV, V‐B 961.26 627.56 U Utility/Misc (Associated w R‐3 structures) 4,000 s.f. I‐A, I‐B, II‐A 1,682.20 1,882.68 U Utility/Misc (Associated w R‐3 structures) 4,000 s.f. II‐B, III‐A, V‐A 1,401.83 1,568.90 U Utility/Misc (Associated w R‐3 structures) 4,000 s.f. III‐B, IV, V‐B 1,121.46 1,255.12 U Utility/Misc (Associated w R‐3 structures) 8,000 s.f. I‐A, I‐B, II‐A 1,922.51 2,510.24 U Utility/Misc (Associated w R‐3 structures) 8,000 s.f. II‐B, III‐A, V‐A 1,602.09 2,091.87 U Utility/Misc (Associated w R‐3 structures) 8,000 s.f. III‐B, IV, V‐B 1,281.67 1,673.50 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 1,000 s.f. I‐A, I‐B, II‐A 7,209.41 1,568.90 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 1,000 s.f. II‐B, III‐A, V‐A 6,007.84 1,307.42 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 1,000 s.f. III‐B, IV, V‐B 4,806.28 1,045.94 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 5,000 s.f. I‐A, I‐B, II‐A 10,814.12 3,137.81 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 5,000 s.f. II‐B, III‐A, V‐A 9,011.77 2,614.84 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 5,000 s.f. III‐B, IV, V‐B 7,209.41 2,091.87 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 10,000 s.f. I‐A, I‐B, II‐A 11,294.75 5,177.38 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 10,000 s.f. II‐B, III‐A, V‐A 9,412.29 4,314.48 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 10,000 s.f. III‐B, IV, V‐B 7,529.83 3,451.59 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 50,000 s.f. I‐A, I‐B, II‐A 16,581.65 9,099.64 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 50,000 s.f. II‐B, III‐A, V‐A 13,818.04 7,583.03 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 50,000 s.f. III‐B, IV, V‐B 11,054.43 6,066.43 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 100,000 s.f. I‐A, I‐B, II‐A 22,589.49 11,766.77 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 100,000 s.f. II‐B, III‐A, V‐A 18,824.58 9,805.64 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 100,000 s.f. III‐B, IV, V‐B 15,059.66 7,844.52 H‐5 HPM, 1,000 s.f. I‐A, I‐B, II‐A 10,573.81 1,255.12 H‐5 HPM, 1,000 s.f. II‐B, III‐A, V‐A 8,811.50 1,045.94 H‐5 HPM, 1,000 s.f. III‐B, IV, V‐B 7,049.20 836.75
BUILDING DIVISION ‐ Table A: New Construction
Service Name Current Fee Current Fee
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
H‐5 HPM, 5,000 s.f. I‐A, I‐B, II‐A 2, 16,341.34 667.14 H‐5 HPM, 5,000 s.f. II‐B, III‐A, V‐A 2, 13,617.78 222.61 H‐5 HPM, 5,000 s.f. III‐B, IV, V‐B 1, 10,894.22 778.09 H‐5 HPM, 10,000 s.f. I‐A, I‐B, II‐A 4, 17,062.28 549.82 H‐5 HPM, 10,000 s.f. II‐B, III‐A, V‐A 3, 14,218.56 791.52 H‐5 HPM, 10,000 s.f. III‐B, IV, V‐B 3, 11,374.85 033.21 H‐5 HPM, 20,000 s.f. I‐A, I‐B, II‐A 6, 20,186.36 589.39 H‐5 HPM, 20,000 s.f. II‐B, III‐A, V‐A 5, 16,821.96 491.16 H‐5 HPM, 20,000 s.f. III‐B, IV, V‐B 4, 13,457.57 392.93 H‐5 HPM, 50,000 s.f. I‐A, I‐B, II‐A 7, 25,232.94 844.52 H‐5 HPM, 50,000 s.f. II‐B, III‐A, V‐A 6, 21,027.45 537.10 H‐5 HPM, 50,000 s.f. III‐B, IV, V‐B 5, 16,821.96 229.68 H‐5 HPM, 100,000 s.f. I‐A, I‐B, II‐A 10, 35,806.75 197.87 H‐5 HPM, 100,000 s.f. II‐B, III‐A, V‐A 8, 29,838.96 498.22 H‐5 HPM, 100,000 s.f. III‐B, IV, V‐B 6, 23,871.17 798.58 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 1,000 s.f. I‐A, I‐B, II‐A 9,852.86 1, 725.79 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 1,000 s.f. II‐B, III‐A, V‐A 8,210.72 1, 438.16 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 1,000 s.f. III‐B, IV, V‐B 6,568.58 1, 150.53 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 5,000 s.f. I‐A, I‐B, II‐A 15,860.71 3, 451.59 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 5,000 s.f. II‐B, III‐A, V‐A 13,217.26 2,876.32 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 5,000 s.f. III‐B, IV, V‐B 10,573.81 2,301.06 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 10,000 s.f. I‐A, I‐B, II‐A 16,341.34 6,118.72 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 10,000 s.f. II‐B, III‐A, V‐A 13,617.78 5,098.93 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 10,000 s.f. III‐B, IV, V‐B 10,894.22 4,079.15 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 20,000 s.f. I‐A, I‐B, II‐A 19,465.41 8,628.97 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 20,000 s.f. II‐B, III‐A, V‐A 16,221.18 7,190.81 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 20,000 s.f. III‐B, IV, V‐B 12,976.94 5,752.64 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 50,000 s.f. I‐A, I‐B, II‐A 24,271.69 10,354.76 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 50,000 s.f. II‐B, III‐A, V‐A 20,226.41 8,628.97 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 50,000 s.f. III‐B, IV, V‐B 16,181.13 6,903.17 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 100,000 s.f. I‐A, I‐B, II‐A 34,605.18 13,335.68 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 100,000 s.f. II‐B, III‐A, V‐A 28,837.65 11,113.06 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 100,000 s.f. III‐B, IV, V‐B 23,070.12 8,890.45 I‐4, I‐2.1 Day Care/Outpatient 1,000 s.f. I‐A, I‐B, II‐A 9,852.86 1,568.90 I‐4, I‐2.1 Day Care/Outpatient 1,000 s.f. II‐B, III‐A, V‐A 8,210.72 1,307.42 I‐4, I‐2.1 Day Care/Outpatient 1,000 s.f. III‐B, IV, V‐B 6,568.58 1,045.94 I‐4, I‐2.1 Day Care/Outpatient 5,000 s.f. I‐A, I‐B, II‐A 15,620.39 3,294.70 I‐4, I‐2.1 Day Care/Outpatient 5,000 s.f. II‐B, III‐A, V‐A 13,016.99 2,745.58 I‐4, I‐2.1 Day Care/Outpatient 5,000 s.f. III‐B, IV, V‐B 10,413.60 2,196.46 I‐4, I‐2.1 Day Care/Outpatient 10,000 s.f. I‐A, I‐B, II‐A 16,341.34 5,648.05 I‐4, I‐2.1 Day Care/Outpatient 10,000 s.f. II‐B, III‐A, V‐A 13,617.78 4,706.71 I‐4, I‐2.1 Day Care/Outpatient 10,000 s.f. III‐B, IV, V‐B 10,894.22 3,765.37 I‐4, I‐2.1 Day Care/Outpatient 20,000 s.f. I‐A, I‐B, II‐A 19,465.41 8,158.30 I‐4, I‐2.1 Day Care/Outpatient 20,000 s.f. II‐B, III‐A, V‐A 16,221.18 6,798.58 I‐4, I‐2.1 Day Care/Outpatient 20,000 s.f. III‐B, IV, V‐B 12,976.94 5,438.86 I‐4, I‐2.1 Day Care/Outpatient 50,000 s.f. I‐A, I‐B, II‐A 24,271.69 9,727.20 I‐4, I‐2.1 Day Care/Outpatient 50,000 s.f. II‐B, III‐A, V‐A 20,226.41 8,106.00 I‐4, I‐2.1 Day Care/Outpatient 50,000 s.f. III‐B, IV, V‐B 16,181.13 6,484.80 I‐4, I‐2.1 Day Care/Outpatient 100,000 s.f. I‐A, I‐B, II‐A 34,605.18 11,766.77 I‐4, I‐2.1 Day Care/Outpatient 100,000 s.f. II‐B, III‐A, V‐A 28,837.65 9,805.64 I‐4, I‐2.1 Day Care/Outpatient 100,000 s.f. III‐B, IV, V‐B 23,070.12 7,844.52 M Mercantile 1,000 s.f. I‐A, I‐B, II‐A 6,728.79 2,667.14 M Mercantile 1,000 s.f. II‐B, III‐A, V‐A 5,607.32 2,222.61 M Mercantile 1,000 s.f. III‐B, IV, V‐B 4,485.86 1,778.09 M Mercantile 5,000 s.f. I‐A, I‐B, II‐A 10,333.49 4,079.15 M Mercantile 5,000 s.f. II‐B, III‐A, V‐A 8,611.24 3,399.29 M Mercantile 5,000 s.f. III‐B, IV, V‐B 6,888.99 2,719.43 M Mercantile 10,000 s.f. I‐A, I‐B, II‐A 10,814.12 6,118.72 M Mercantile 10,000 s.f. II‐B, III‐A, V‐A 9,011.77 5,098.93 M Mercantile 10,000 s.f. III‐B, IV, V‐B 7,209.41 4,079.15 M Mercantile 20,000 s.f. I‐A, I‐B, II‐A 12,736.63 9,256.53 M Mercantile 20,000 s.f. II‐B, III‐A, V‐A 10,613.86 7,713.77 M Mercantile 20,000 s.f. III‐B, IV, V‐B 8,491.09 6,171.02 M Mercantile 50,000 s.f. I‐A, I‐B, II‐A 15,860.71 11,923.66 M Mercantile 50,000 s.f. II‐B, III‐A, V‐A 13,217.26 9,936.39 M Mercantile 50,000 s.f. III‐B, IV, V‐B 10,573.81 7,949.11
BUILDING DIVISION ‐ Table A: New Construction
Service Name Current Fee Current Fee
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
M Mercantile 100,000 s.f. I‐A, I‐B, II‐A 15, 18,023.53 375.25 M Mercantile 100,000 s.f. II‐B, III‐A, V‐A 12, 15,019.61 812.71 M Mercantile 100,000 s.f. III‐B, IV, V‐B 10, 12,015.69 250.17 M Mercantile 200,000 s.f. I‐A, I‐B, II‐A 20, 20,186.36 238.85 M Mercantile 200,000 s.f. II‐B, III‐A, V‐A 16, 16,821.96 865.71 M Mercantile 200,000 s.f. III‐B, IV, V‐B 13, 13,457.57 492.57 R‐1 Apartments/Hotel Transient 1,000 s.f. I‐A, I‐B, II‐A 8,410. 2, 98 980.92 R‐1 Apartments/Hotel Transient 1,000 s.f. II‐B, III‐A, V‐A 7,00 2, 9.15 484.10 R‐1 Apartments/Hotel Transient 1,000 s.f. III‐B, IV, V‐B 5,607. 1, 32 987.28 R‐1 Apartments/Hotel Transient 5,000 s.f. I‐A, I‐B, II‐A 12,976 5, .94 648.05 R‐1 Apartments/Hotel Transient 5,000 s.f. II‐B, III‐A, V‐A 10,8 4, 14.12 706.71 R‐1 Apartments/Hotel Transient 5,000 s.f. III‐B, IV, V‐B 8,651. 3, 30 765.37 R‐1 Apartments/Hotel Transient 10,000 s.f. I‐A, I‐B, II‐A 13,457.57 9, 413.42 R‐1 Apartments/Hotel Transient 10,000 s.f. II‐B, III‐A, V‐A 11, 7, 214.64 844.52 R‐1 Apartments/Hotel Transient 10,000 s.f. III‐B, IV, V‐B 8,971 6, .71 275.61 R‐1 Apartments/Hotel Transient 20,000 s.f. I‐A, I‐B, II‐A 15,860.71 13, 178.79 R‐1 Apartments/Hotel Transient 20,000 s.f. II‐B, III‐A, V‐A 13, 10, 217.26 982.32 R‐1 Apartments/Hotel Transient 20,000 s.f. III‐B, IV, V‐B 10,57 8, 3.81 785.86 R‐1 Apartments/Hotel Transient 50,000 s.f. I‐A, I‐B, II‐A 19,946.04 15, 845.92 R‐1 Apartments/Hotel Transient 50,000 s.f. II‐B, III‐A, V‐A 16, 13, 621.70 204.93 R‐1 Apartments/Hotel Transient 50,000 s.f. III‐B, IV, V‐B 13,29 7.36 10,563.95 R‐1 Apartments/Hotel Transient 100,000 s.f. I‐A, I‐B, II‐A 28,116.71 20,395.74 R‐1 Apartments/Hotel Transient 100,000 s.f. II‐B, III‐A, V‐A 23,430.59 16,996.45 R‐1 Apartments/Hotel Transient 100,000 s.f. III‐B, IV, V‐B 18,744.47 13,597.16 R‐2 Multi‐Family Residential Apartment ‐ Perm 1,000 s.f. I‐A, I‐B, II‐A 8,410.98 2,824.03 R‐2 Multi‐Family Residential Apartment ‐ Perm 1,000 s.f. II‐B, III‐A, V‐A 7,009.15 2,353.35 R‐2 Multi‐Family Residential Apartment ‐ Perm 1,000 s.f. III‐B, IV, V‐B 5,607.32 1,882.68 R‐2 Multi‐Family Residential Apartment ‐ Perm 5,000 s.f. I‐A, I‐B, II‐A 12,015.69 5,334.27 R‐2 Multi‐Family Residential Apartment ‐ Perm 5,000 s.f. II‐B, III‐A, V‐A 10,013.07 4,445.23 R‐2 Multi‐Family Residential Apartment ‐ Perm 5,000 s.f. III‐B, IV, V‐B 8,010.46 3,556.18 R‐2 Multi‐Family Residential Apartment ‐ Perm 10,000 s.f. I‐A, I‐B, II‐A 12,256.00 9,413.42 R‐2 Multi‐Family Residential Apartment ‐ Perm 10,000 s.f. II‐B, III‐A, V‐A 10,213.33 7,844.52 R‐2 Multi‐Family Residential Apartment ‐ Perm 10,000 s.f. III‐B, IV, V‐B 8,170.67 6,275.61 R‐2 Multi‐Family Residential Apartment ‐ Perm 20,000 s.f. I‐A, I‐B, II‐A 14,418.83 11,452.99 R‐2 Multi‐Family Residential Apartment ‐ Perm 20,000 s.f. II‐B, III‐A, V‐A 12,015.69 9,544.16 R‐2 Multi‐Family Residential Apartment ‐ Perm 20,000 s.f. III‐B, IV, V‐B 9,612.55 7,635.33 R‐2 Multi‐Family Residential Apartment ‐ Perm 50,000 s.f. I‐A, I‐B, II‐A 17,783.22 13,963.24 R‐2 Multi‐Family Residential Apartment ‐ Perm 50,000 s.f. II‐B, III‐A, V‐A 14,819.35 11,636.03 R‐2 Multi‐Family Residential Apartment ‐ Perm 50,000 s.f. III‐B, IV, V‐B 11,855.48 9,308.82 R‐2 Multi‐Family Residential Apartment ‐ Perm 100,000 s.f. I‐A, I‐B, II‐A 24,271.69 17,571.71 R‐2 Multi‐Family Residential Apartment ‐ Perm 100,000 s.f. II‐B, III‐A, V‐A 20,226.41 14,643.10 R‐2 Multi‐Family Residential Apartment ‐ Perm 100,000 s.f. III‐B, IV, V‐B 16,181.13 11,714.48 R‐2.1 Residential Care/Assist Living Facility 1,000 s.f. I‐A, I‐B, II‐A 10,093.18 3,922.26 R‐2.1 Residential Care/Assist Living Facility 1,000 s.f. II‐B, III‐A, V‐A 8,410.98 3,268.55 R‐2.1 Residential Care/Assist Living Facility 1,000 s.f. III‐B, IV, V‐B 6,728.79 2,614.84 R‐2.1 Residential Care/Assist Living Facility 5,000 s.f. I‐A, I‐B, II‐A 14,418.83 5,020.49 R‐2.1 Residential Care/Assist Living Facility 5,000 s.f. II‐B, III‐A, V‐A 12,015.69 4,183.74 R‐2.1 Residential Care/Assist Living Facility 5,000 s.f. III‐B, IV, V‐B 9,612.55 3,346.99 R‐2.1 Residential Care/Assist Living Facility 10,000 s.f. I‐A, I‐B, II‐A 14,899.45 6,589.39 R‐2.1 Residential Care/Assist Living Facility 10,000 s.f. II‐B, III‐A, V‐A 12,416.21 5,491.16 R‐2.1 Residential Care/Assist Living Facility 10,000 s.f. III‐B, IV, V‐B 9,932.97 4,392.93 R‐2.1 Residential Care/Assist Living Facility 20,000 s.f. I‐A, I‐B, II‐A 17,783.22 8,472.08 R‐2.1 Residential Care/Assist Living Facility 20,000 s.f. II‐B, III‐A, V‐A 14,819.35 7,060.06 R‐2.1 Residential Care/Assist Living Facility 20,000 s.f. III‐B, IV, V‐B 11,855.48 5,648.05 R‐2.1 Residential Care/Assist Living Facility 50,000 s.f. I‐A, I‐B, II‐A 21,628.24 11,139.21 R‐2.1 Residential Care/Assist Living Facility 50,000 s.f. II‐B, III‐A, V‐A 18,023.53 9,282.68 R‐2.1 Residential Care/Assist Living Facility 50,000 s.f. III‐B, IV, V‐B 14,418.83 7,426.14 R‐2.1 Residential Care/Assist Living Facility 100,000 s.f. I‐A, I‐B, II‐A 29,558.59 14,433.91 R‐2.1 Residential Care/Assist Living Facility 100,000 s.f. II‐B, III‐A, V‐A 24,632.16 12,028.26 R‐2.1 Residential Care/Assist Living Facility 100,000 s.f. III‐B, IV, V‐B 19,705.73 9,622.61 R‐3 Single Family Residential 2,000 s.f. I‐A, I‐B, II‐A 3,364.39 1,098.23 R‐3 Single Family Residential 2,000 s.f. II‐B, III‐A, V‐A 2,803.66 915.19 R‐3 Single Family Residential 2,000 s.f. III‐B, IV, V‐B 2,242.93 732.15 R‐3 Single Family Residential 3,000 s.f. I‐A, I‐B, II‐A 4,325.65 1,255.12 R‐3 Single Family Residential 3,000 s.f. II‐B, III‐A, V‐A 3,604.71 1,045.94 R‐3 Single Family Residential 3,000 s.f. III‐B, IV, V‐B 2,883.77 836.75
BUILDING DIVISION ‐ Table A: New Construction
Service Name Current Fee Current Fee
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
R‐3 Single Family Residential 5,000 s.f. I‐A, I‐B, II‐A 6,248.16 1,725.79 R‐3 Single Family Residential 5,000 s.f. II‐B, III‐A, V‐A 5,206.80 1,438.16 R‐3 Single Family Residential 5,000 s.f. III‐B, IV, V‐B 4,165.44 1,150.53 R‐3 Single Family Residential 10,000 s.f. I‐A, I‐B, II‐A 6,969.10 2,353.35 R‐3 Single Family Residential 10,000 s.f. II‐B, III‐A, V‐A 5,807.58 1,961.13 R‐3 Single Family Residential 10,000 s.f. III‐B, IV, V‐B 4,646.07 1,568.90 R‐3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. I‐A, I‐B, II‐A 10,093.18 2,196.46 R‐3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. II‐B, III‐A, V‐A 8,410.98 1,830.39 R‐3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. III‐B, IV, V‐B 6,728.79 1,464.31 R‐3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. I‐A, I‐B, II‐A 14,418.83 3,451.59 R‐3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. II‐B, III‐A, V‐A 12,015.69 2,876.32 R‐3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. III‐B, IV, V‐B 9,612.55 2,301.06 R‐3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. I‐A, I‐B, II‐A 14,899.45 4,706.71 R‐3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. II‐B, III‐A, V‐A 12,416.21 3,922.26 R‐3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. III‐B, IV, V‐B 9,932.97 3,137.81 R‐3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. I‐A, I‐B, II‐A 17,783.22 6,589.39 R‐3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. II‐B, III‐A, V‐A 14,819.35 5,491.16 R‐3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. III‐B, IV, V‐B 11,855.48 4,392.93 R‐3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. I‐A, I‐B, II‐A 21,628.24 7,844.52 R‐3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. II‐B, III‐A, V‐A 18,023.53 6,537.10 R‐3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. III‐B, IV, V‐B 14,418.83 5,229.68 R‐3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. I‐A, I‐B, II‐A 29,558.59 10,197.87 R‐3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. II‐B, III‐A, V‐A 24,632.16 8,498.22 R‐3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. III‐B, IV, V‐B 19,705.73 6,798.58 R‐4 Residential Care/Assisted Living Facility 1,000 s.f. I‐A, I‐B, II‐A 10,093.18 1,568.90 R‐4 Residential Care/Assisted Living Facility 1,000 s.f. II‐B, III‐A, V‐A 8,410.98 1,307.42 R‐4 Residential Care/Assisted Living Facility 1,000 s.f. III‐B, IV, V‐B 6,728.79 1,045.94 R‐4 Residential Care/Assisted Living Facility 5,000 s.f. I‐A, I‐B, II‐A 14,418.83 2,824.03 R‐4 Residential Care/Assisted Living Facility 5,000 s.f. II‐B, III‐A, V‐A 12,015.69 2,353.35 R‐4 Residential Care/Assisted Living Facility 5,000 s.f. III‐B, IV, V‐B 9,612.55 1,882.68 R‐4 Residential Care/Assisted Living Facility 10,000 s.f. I‐A, I‐B, II‐A 14,899.45 4,706.71 R‐4 Residential Care/Assisted Living Facility 10,000 s.f. II‐B, III‐A, V‐A 12,416.21 3,922.26 R‐4 Residential Care/Assisted Living Facility 10,000 s.f. III‐B, IV, V‐B 9,932.97 3,137.81 R‐4 Residential Care/Assisted Living Facility 20,000 s.f. I‐A, I‐B, II‐A 17,783.22 6,118.72 R‐4 Residential Care/Assisted Living Facility 20,000 s.f. II‐B, III‐A, V‐A 14,819.35 5,098.93 R‐4 Residential Care/Assisted Living Facility 20,000 s.f. III‐B, IV, V‐B 11,855.48 4,079.15 R‐4 Residential Care/Assisted Living Facility 50,000 s.f. I‐A, I‐B, II‐A 21,628.24 7,373.84 R‐4 Residential Care/Assisted Living Facility 50,000 s.f. II‐B, III‐A, V‐A 18,023.53 6,144.87 R‐4 Residential Care/Assisted Living Facility 50,000 s.f. III‐B, IV, V‐B 14,418.83 4,915.90 R‐4 Residential Care/Assisted Living Facility 100,000 s.f. I‐A, I‐B, II‐A 29,558.59 9,413.42 R‐4 Residential Care/Assisted Living Facility 100,000 s.f. II‐B, III‐A, V‐A 24,632.16 7,844.52 R‐4 Residential Care/Assisted Living Facility 100,000 s.f. III‐B, IV, V‐B 19,705.73 6,275.61 U Detached Access. Structure 2,000 s.f. I‐A, I‐B, II‐A 3,845.02 2,039.57 U Detached Access. Structure 2,000 s.f. II‐B, III‐A, V‐A 3,204.18 1,699.64 U Detached Access. Structure 2,000 s.f. III‐B, IV, V‐B 2,563.35 1,359.72 U Detached Access. Structure 3,000 s.f. I‐A, I‐B, II‐A 4,806.28 2,196.46 U Detached Access. Structure 3,000 s.f. II‐B, III‐A, V‐A 4,005.23 1,830.39 U Detached Access. Structure 3,000 s.f. III‐B, IV, V‐B 3,204.18 1,464.31 U Detached Access. Structure 5,000 s.f. I‐A, I‐B, II‐A 6,969.10 3,294.70 U Detached Access. Structure 5,000 s.f. II‐B, III‐A, V‐A 5,807.58 2,745.58 U Detached Access. Structure 5,000 s.f. III‐B, IV, V‐B 4,646.07 2,196.46 U Detached Access. Structure 10,000 s.f. I‐A, I‐B, II‐A 7,690.04 4,392.93 U Detached Access. Structure 10,000 s.f. II‐B, III‐A, V‐A 6,408.37 3,660.77 U Detached Access. Structure 10,000 s.f. III‐B, IV, V‐B 5,126.69 2,928.62 Footnotes:
1. Shells pay 70% of the full fees.
2. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged based on current billable hourly rates for City of Corona reviews and actual hourly contracted rates for consultant reviews.
3. Where plans are incomplete or changed so as to require additional plan checks, an additional plan check fee shall be charged at the rate established by the fee schedule and minimum hours as determined by the Building Official.
BUILDING DIVISION ‐ Table B: Miscellaneous Fees
Service Name Current Fee Current Fee
Minimum Fee
Plan Check or Building Inspection $ 123.00 $ 123.00 If fee < $123 ‐ Staff will charge $123
If fee > $123 ‐ Staff will charge fee
Fence ‐ First 100 lineal feet (wood, vinyl, w.iron, etc.) 103.13 98.06 Each additional 100 lineal feet 9.78 13.07 All masonry wall heights measured from top of footing to top of wall Masonry Wall ‐ City Standard ‐ First 100 lineal feet 127.59 196.11 Each additional 100 ft. 9.78 22.23 Masonry Wal l‐ Special Design ‐ ≤ 6ft high ‐ First 100 lineal feet 325.44 196.11 Each additional 100 ft. 61.69 65.37 Retaining Wall ‐ City Standard ‐ First 100 lineal feet 127.59 130.74 Each additional 100 ft. 19.57 65.37 Retaining Wall ‐ Special Design ‐≤6 ft. high ‐ First 100 lineal feet 325.44 196.11 Each additional 100 ft. 61.69 98.06 Retaining Wall ‐ Special Design ‐ over 6 ft. high per 1,000 sq. ft. 602.07 392.23 Combo ‐ Wall per City Std 6 ft. wall over 2 ft. retaining first 100 lineal feet 127.59 163.43 Each additional 100 ft. 19.57 98.06 Combo Wall ‐ Special Design ‐ First 100 lineal feet 723.14 326.85 Each additional 100 linear feet 61.69 65.37 Fireplace ‐ Masonry ‐ Freestanding ‐ previously approved engineered 154.39 130.74 Fireplace ‐ Special Design ‐ Freestanding 376.70 326.85 Residential Patio Cover ‐ City Std ‐ lattice first 500 sq. ft. 178.85 261.48 Each additional 500 sq ft ‐ 65.37 Residential Patio Cover City Std ‐ Solid roof ‐ first 500 sq. ft 178.85 261.48 Each additional 500 sq. ft. ‐ 78.45 Residential Patio Cover Special Design ‐ Lattice ‐ first 500 sq. ft. 376.70 261.48 Each additional 500 sq ft 61.69 78.45 Residential Patio Cover Special Design ‐ Solid roof ‐ first 500 sq. ft. 376.70 261.48 Each additional 500 sq. ft. 61.69 98.06 Commercial Patio Cover Special Design ‐ Lattice ‐ first 500 sq. ft. 376.70 261.48 Each additional 500 sq ft 61.69 78.45 Commercial Patio Cover Special Design ‐ Solid roof ‐ first 500 sq. ft. 376.70 261.48 Each additional 500 sq. ft. 61.69 98.06 Patio Enclosure First 500 sq. ft. ‐ ICC 136.15 196.11 Each additional 500 sq. ft. ‐ 98.06 Patio Enclosure First 500 sq. ft. ‐ Conventional/Special Design 191.62 196.11 Each additional 500 sq. ft. ‐ 98.06 Balcony ‐ City Standard ‐ first 500 sq. ft. 227.77 261.48 Each additional 500 sq. ft. ‐ 98.06 Balcony ‐ Special Design ‐ first 500 sq. ft. 438.40 261.48 Each additional 500 sq. ft. 61.69 65.37 Residential Garage ‐ wood frame ‐ first 500 sq. ft. 814.76 392.23 each additional 500 sq ft 61.69 261.48 CITY OF CORONA
Plan Check Only
(with PME Included) Inspection Only
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
BUILDING DIVISION ‐ Table B: Miscellaneous Fees
Service Name Current Fee Current Fee
CITY OF CORONA
Plan Check Only
(with PME Included) Inspection Only
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
SFR Carport ‐ City Standard ‐ Solid Roof ‐ first 500 sq. ft. 252.44 261.48 Each additional 500 sq. ft. ‐ 78.45 SFR Carport ‐ Special Design ‐ first 500 sq. ft. 376.70 261.48 Each additional 500 sq. ft. 61.69 65.37 MFR/Comm Carport ‐ first 500 sq. ft. 376.70 261.48 Each additional 500 sq. ft. 61.69 65.37 Storage Shed:
Wood frame first 500 sq. ft. 415.01 261.48 Each additional 500 sq. ft. (any material) 61.69 65.37 Masonry 538.40 392.23 Metal/Other 229.93 261.48 Loft ‐ Special Design ‐ first 500 sq. ft. 474.54 392.23 Each additional 500 sq. ft. ‐ 98.06 Garage Conversion ‐ Conventional Construction ‐ first 500 sq. ft. 415.01 522.97 Each additional 500 sq. ft. (see Note 1) ‐ 98.06 Garage Conversion ‐ Special Design ‐ first 500 sq. ft. 538.40 37.30 Each additional 500 sq. ft. (see Note 2) ‐ ‐ Existing Garage Conversion into Accessory Dwelling Unit ADU 1,250.28 784.45 Each Additional 500 sq ft ‐ 98.06 New Accessory Dwelling Unit ADU
Fee as a new SFD per sq. ft.
Swimming Pool ‐ Private ‐ First 800 sq. ft. 476.36 653.71 Each additional 500 sq. ft. 30.85 196.11 Swimming Pool Fiberglass / Vinyl 102.05 522.97 Swimming Pool ‐ Public ‐ First 800 sq. ft. 938.15 653.71 Each additional 500 sq. ft. 30.85 196.11 Swimming pool grotto or additional structural/water features ‐ each 123.39 196.11 Swimming pool misc structure or code upgrade/modifications 123.39 196.11 Ponds/Fountains 200 sq. ft. or less 123.39 261.48 Room Addition Single Family Dwelling ‐ first 500 sq. ft. 907.30 653.71 Each additional 500 sq. ft. 130.85 196.11 Foundation Repair /seismic upgrade/per 200 lineal feet of foundation 246.78 196.11 Window Residential ‐ New / Changeout / Skylights 100.00 98.06 Window Non‐Residential ‐ New / Changeout / Skylights (Each 50) 222.47 98.06 Re‐roof ‐ Residential comp over 1 existing layer
First 3,000 sq. ft. 79.77 98.06 Each additional 1,500 sq. ft. 12.34 13.07 Re‐roof Residential ‐ Special Design ‐ Tile, etc.
First 3,000 sq. ft. 110.61 98.06 Each additional 1,500 sq. ft. 24.68 13.07 Re‐roof ‐ Non Residential
First 50,000 sq. ft. 138.56 163.43 Each additional 50,000 sq. ft. 12.34 98.06 Swimming pool / Spa permit includes: slide /rock features/ 1 electrical pool panel/2 pumps/pool lights/filter/treatment systems/all piping and electrical wiring‐Heaters not included‐see Mechanical fee schedule (Table E)/Additional electrical panels or motors per Electrical fee schedule (Table D)
BUILDING DIVISION ‐ Table B: Miscellaneous Fees
Service Name Current Fee Current Fee
CITY OF CORONA
Plan Check Only
(with PME Included) Inspection Only
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
Storage Racks 6 ft. and Higher ‐ Interior
First 500 lineal feet 515.02 130.74 Each additional 500 ft. 65.37 61.69 Storage Racks 6 ft and Higher ‐ Exterior
First 500 lineal feet 676.44 130.74 Each additional 500 ft. 65.37 ‐ Cell Site / Commercial Antenna Structure ‐ Each 814.76 196.11 Flag Pole ‐ City Standard ‐ Each 65.37 69.16 Silo ‐ Per 5,000 Cu. Ft. Volume 799.83 261.48 Miscellaneous Plan Check ‐ Includes 3 Plan Checks / Inspections Only Additional charges per hour begin at 4th review or inspection 1, 306.02 392.23 Single Family Dwelling and Garage Fire Damage
Up to 30% Fire Damage Miscellaneous ‐ includes 3 plan checks/inspections only 539.59 392.23 30%‐70% Fire Damage 1,023.29 784.45 70%‐100% Fire Damage (Fee for new single family dwelling and new garage will apply) ‐ 980.56 Commercial / Industrial Canopy
First 1,000 sq. ft. 938.15 392.23 Each additional 1,000 sq. ft. 98.06 89.64 Fueling Station Canopy per 2,000 sq. ft. 938.15 392.23 Sign ‐ Non‐Electrical 200 sq. ft. or less
Wall Mounted 61.69 130.74 Monument 6 ft. high or less 123.39 130.74 Pole sign 200 sq. ft. or less and 20 ft. high or less 370.17 196.11 Each additional 200 sq. ft. and/or each additional 20 ft. height 61.69 65.37 Sign ‐ Electrical ‐ see Electrical fees
Site Accessibility Improvements:
Per Ramp 474.35 130.74 Per Stairway 493.55 261.48 Per Accessible Parking Stall 493.55 130.74 Per Elevator / Lift 493.55 522.97 Parking lot restripe per 100 parking spaces 246.78 130.74 Demolition:
Pool Demo without Compaction Report 61.69 98.06 Pool Demo with Compaction Report 352.98 65.37 Residential Demo (Interior Only) 123.39 65.37 Residential Demo 414.67 65.37 Non‐Res Demo (Interior Only) 123.39 65.37 Non‐Res Demo 414.67 65.37 Demising Wall per 1,000 sq. ft. 406.56 261.48 Manufactured Home
First Section 12'x60' (720 sq. ft.) 671.14 196.11 Each additional section 61.69 32.69 Manufactured Home Foundation System
First Section 12'x60' (720 sq. ft.) 401.16 261.48 Each additional section 61.69 32.69 Commercial Coach / Manufactured Building
first Section 12'x60' (720 sq. ft.) 794.53 261.48 Each additional section 61.69 65.37
BUILDING DIVISION ‐ Table B: Miscellaneous Fees
Service Name Current Fee Current Fee
CITY OF CORONA
Plan Check Only
(with PME Included) Inspection Only
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
Foundation System for Commercial Coach / Manufactured Building First Section 12'x60' (720 sq. ft.) 715.83 261.48 Each additional section 32.69 61.69 Vault
Underground 65.37 629.67
Above Ground 65.37 567.98
Bleachers per 1,000 sq. ft. 770.07 261.48 Certified Access Specialist Program (CASP) Review ‐ Per Hour 123 .39 130.74 Code Compliance Inspection ‐ Per Hour ‐ 130.74 Footnotes:
3. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.
Note 2: Same as Note 1, but with Engineering.
1. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged based on current billable hourly rates for City of Corona reviews and actual hourly contracted rates for consultant reviews.
2. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.
4. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees. * Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.
Note 1: This item applies to the conversion of an existing garage into a habitable space such as: a bedroom, guest room, living room, family room, etc., but not an Accessory Dwelling Unit (ADU).
BUILDING DIVISION ‐ Table C: Plumbing
Service Name Current Fee Current Fee
Minimum Fee
Plan Check or Building Inspection $ 123.00 $ 123.00 If fee < $123 ‐ Staff will charge $123
If fee > $123 ‐ Staff will charge fee
Plumbing Fee Per Each Fixture
Water Closet(Toilet)/Bidet 13.07 15.95 Lavatory/Sink 13.07 15.95
Kitchen Sink 13.07 15.95
Bathtub 13.07 15.95
Shower 13.07 15.95
Dishwasher 13.07 15.95
Laundry Tray or Mop Sink 13.07 15.95 Urinal & Waterless Urinal 13.07 15.95 Clothes washer 13.07 15.95
Floor Sink or Floor Drain 13.07 15.95 Water Heater‐storage tank 100 Gal or less 32.69 62.77 Water Heater‐storage tank over 100 Gal 52.30 111.69 Water Heater‐Gas‐instantaneous 199,000 btu or less 133.17 196.11 Water Heater‐Electrical instantaneous (insta hot) 13.07 15.95 MISC fixtures Per fixture 13.07 15.95 Each Gas Outlet 6.54 15.95
Hose Bibb 9.81 13.49
Lawn Sprinkler valve/Backflow device 3.92 13.49 Building Sewer/Trailer park sewer‐per unit 3.92 13.49 Septic Tank/Leach field 65.37 24.46 Septic Tank Demolition 65.37 40.63 Interceptor‐Grease, oil, sand etc. 256.56 130.74 Water Softener 26.15 24.46
Solar or Hydronic Systems 129.19 130.74 Water Repipe‐Single Family Dwelling 97.84 196.11 Misc piping per 300 lineal ft 40.63 65.37 Medical Gas/Air outlets each 22.12 9.81 Gray Water System 133.17 196.11 Roof Drains ‐ per building 133.17 196.11 CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
Plan Check Only
(with PME Included) Inspection Only
BUILDING DIVISION ‐ Table C: Plumbing
Service Name Current Fee Current Fee
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
Plan Check Only
(with PME Included) Inspection Only
Commercial Reclaimed water system 133.17 196.11 Water Service 13.07 15.95
Pressure Regulator (1.34) 15.95 Hot Water Recirculation System 32.69 40.63 Backflow valves 6.54 22.12
Sump Pump ‐ Per Building 256.56 196.11 Sewage Ejection System/Grinder Pump ‐ Per Site 379.95 196.11 Swimming pool misc piping/retrofit/repair 32.69 40.63 Above Ground Storage Tank Install (0‐660 gallons) 65.37 449.99 Above Ground Storage Tank Install (661+ gallons) 652.08 130.74 Footnotes:
2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.
1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.
3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees noted above. * Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.
BUILDING DIVISION - Table D: Electrical
Service Name Current Fee Current Fee
Minimum Fee
Plan Check or Building Inspection $ 123.00 $ 123.00
If fee < $123 - Staff will charge $123
If fee > $123 - Staff will charge fee
Single Family Residential
New Service - Single Family Dwelling 225 amps or less service 256.56 392.23 (includes Circuits, Outlets, Switches, etc. no sub-panels included) Sub-Panels - Single family Single phase 225 amps or less 133.17 98.06 Service Change-Out -Single Family Single phase 73.38 196.11 Residential rewire without panel change out minimum fee up to 1,500 square feet (includes Circuits, Outlets, Switches, etc. no sub-panels included) 55.89 261.48
Residential rewire without panel change out minimum fee from 1,500 to 5,000 square feet (includes Circuits, Outlets, Switches, etc. and 1 sub-panels included) 55.89 326.85 Residential rewire with panel change out minimum fee up to 1,500 square feet (includes Circuits, Outlets, Switches, etc. no sub-panels included) 55.89 326.85
Residential rewire with panel change out minimum fee from 1,500 to 5,000 square feet (includes Circuits, Outlets, Switches, etc. and 1 sub-panels included) 55.89 392.23
New Service - Single Family Single phase Services 400 amps or less 379.95 392.23 New Service - Single Family Single phase Services 600 amps or less 379.95 392.23 New Service - Single Family Single phase Services 1200 amps or less 379.95 326.85 New Service - Single Family Single phase Services each additional 1000 amps 133.17 130.74 New Services - Commercial/Industrial and all three phase (Circuits, Outlets, Switches, etc. no sub-panels included) 225 Amps or less 256.56 261.48
400 Amps 379.95 392.23
600 Amps 503.34 522.97
800 Amps 503.34 522.97
1000 Amps 503.34 522.97
1200 Amps 503.34 522.97
1600 Amps 503.34 522.97
each 1000 Amps over 1600 318.26 261.48
Commercial/Industrial and all three phase - "Service Only" change out (Service panel only does not include wiring new circuits) 225 Amps or less 102.88 196.11
400 Amps 133.17 261.48
600 Amps 256.56 261.48
800 Amps 256.56 261.48
1000 Amps 256.56 261.48
1200 Amps 256.56 287.63
1600 Amps 256.56 326.85
each 1000 Amps over 1600 133.17 130.74
Sub-panels, motor control panels etc.
Commercial/Industrial and all three phases
225 Amps or less 256.56 261.48
400 Amps 256.56 261.48
600 Amps 256.56 392.23
800 Amps 379.95 392.23
1000 Amps 379.95 522.97
1200 Amps 379.95 522.97
1600 Amps 379.95 522.97
each 1000 Amps over 1600 194.87 130.74
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
NON-MARKET BASED FEES
MASTER FEE RECOVERY SCHEDULE
BUILDING DIVISION - Table D: Electrical
Service Name Current Fee Current Fee
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
NON-MARKET BASED FEES
MASTER FEE RECOVERY SCHEDULE
Other misc electrical Items
Transformer - each 133.17 130.74
Generator - Permanent - each 1000 amps 256.56 196.11
Generator - Temporary - more than 8 kW 24.46 32.69
Solar - Photovoltaic - Residential 15 KW or Less 314.71 130.74 Solar - Photovoltaic - Residential each additional KW above 15 KW 8.23 6.54 Solar - Photovoltaic - Commercial 50 KW or Less 629.26 261.48 Solar - Photovoltaic - Commercial each additional KW between 51 KW and 250 KW 4.11 2.18 Solar - Photovoltaic - Commercial each additional kW above 250 KW 1.86 1.86 Temporary Power Pole 92.06 22.23
Temporary Power Pole - additional receptacle pole - 26.15 130.74
Light Standard - First 5 poles 194.87 32.69
each additional 5 poles 40.63 32.69
Electrical Sign - per sign 200 sq ft or less/includes 2 sign transformers Wall mounted 200 sq ft or less 97.84 196.11
Monument 6 ft high or less and 200 sq ft or less 256.56 196.11 Pole/monument sign 200 sq ft or less and 20 ft high or less 379.95 196.11 Each additional 200 sq ft and/or each additional 20 ft height and/or each additional 2 sign transformers 40.63 98.06 Cell site Electrical per commercial panels schedule
Hazardous Locations Misc Electrical 256.56 261.48
Fuel Cell- Power Generating System-Each 200 amp ac output 581.70 261.48 Electric Vehicle Charging Station:
Commercial 140.64 65.37
Residential 109.79 65.37
EV-only Main Service Panel 40.63 65.37
Electrical Meter Reset 24.46 65.37
Misc Electrical circuits-Residential (added to existing panel) 9.78 196.11 Misc Electrical Circuits-Non Residential (added to existing panel) 256.56 196.11 Swimming pool pump motor 86.15 130.74
Footnotes:
2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.
3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar photovoltaic fees noted above. * Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.
1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.
BUILDING DIVISION ‐ Table E: Mechanical
Service Name Current Fee Current Fee
Minimum Fee
Plan Check or Building Inspection $ 123.00 $ 123.00 If fee < $123 ‐ Staff will charge $123
If fee > $123 ‐ Staff will charge fee
A/C Unit ≤ 100,000 BTU 52.30 263.10
A/C Unit > 100,000 BTU 65.37 263.10
FAU Furnace or Heat Pump < 100,000 BTU 52.30 263.10 FAU Furnace or Heat Pump > 100,000 BTU 65.37 263.10 Refrigeration Unit 52.30 201.40
Condensors 52.30 97.45
Boilers 100,000 BTU or less 426.84 261.48 Boilers 500,000 BTU or less 426.84 261.48 Boilers 1,000,000 BTU or less 550.23 261.48 Boilers 1,750,000 BTU or less 550.23 392.23 Boilers over 1,750,000 BTU 550.23 522.97 Compressors 32.69 176.73
Evaporative Coolers ‐ Residential 140.64 130.74 Evaporative Coolers ‐ Commercial / Industrial 171.48 130.74 Air Handling Unit 324.79 130.74 Environmental Air Duct / Vent Fan single duct / Res range exhaust 6.54 15.95 Type 1 or 2 Hood / Duct system 348.18 261.48 Miscellaneous Duct Work 65.37 133.17
Special Equipment ‐ Spray Booth (Exterior of Bldg) 654.05 196.11 Special Equipment ‐ Spray Booth (Interior of Bldg) 492.63 196.11 Unlisted Equipment (Minimum or by the hour) 503.22 130.74 Wall Heater 133.17 130.74 Commercial Unit Heater 171.48 196.11 Cooling Tower / Chiller 671.30 392.23 Dryer Duct 19.04 9.81 Fueling Station Dispenser / Equipment 654.05 196.11 Underground Storage Tank (1 tank) 746.26 196.11 Underground Storage Tank (2 tanks) 804.85 196.11 Underground Storage Tank (3 tanks) 917.30 196.11 CITY OF CORONA
Plan Check Only
(with PME
Included)
Inspection Only
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
BUILDING DIVISION ‐ Table E: Mechanical
Service Name Current Fee Current Fee
CITY OF CORONA
Plan Check Only
(with PME
Included)
Inspection Only
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
Underground Storage Tank (add'l tank over 3) 32.69 125.50 Above Ground Storage Tank Install (0‐660 gallons) 65.37 409.63 Above Ground Storage Tank Install (661+ gallons) 611.72 130.74 Package wall unit heat / cooling ≤ 100,000 BTU 133.17 130.74 Fireplace ‐ Listed Mechanical per unit 32.69 119.33 Decorative Gas Appliance 13.07 94.66
Product ‐ Conveying Duct System‐Dust, Vapor, Central Vacuum system (PC based on dust collection) 536.31 196.11 Fan ‐ coil unit ‐ residential 65.37 40.63 Fan ‐ Whole House 98.06 133.17
Dust Collection System 412.92 261.48 Process piping system ‐ 0‐500 ft 256.56 261.48 Process piping system ‐ 501‐1,000 ft 256.56 392.23 Process piping system ‐ 1,000+ ft 626.73 784.45 Solar or Hydronic systems 65.37 250.18
Swimming Pool Solar System 65.37 211.87 Thermal Energy Storage System 311.88 196.11 Residential FAU Change out (Same Location) 98.06 71.48 Residential A/C Condensor Change Out 65.37 71.48 Combo: Residential FAU and/or A/C Condensor Change Out (Same Location) 71.48 130.74 Non‐Residential FAU Change out (Same Location) 71.48 130.74 Non‐Residential A/C Condensor Change Out 71.48 130.74 Swimming Pool Heater 38.67 130.74 Industrial Ovens 379.95 196.11 Footnotes:
2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.
1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.
3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees noted above. * Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
A‐1 Theater 1,000 s.f. I‐A, I‐B, II‐A $ 2,090.73 $ 470.67 $ 3,484.55 $ 784.45 A‐1 Theater 1,000 s.f. II‐B, III‐A, V‐A 1,742.27 392.23 2,903.79 653.71 A‐1 Theater 1,000 s.f. III‐B, IV, V‐B 1,393.82 313.78 2,323.03 522.97 A‐1 Theater 5,000 s.f. I‐A, I‐B, II‐A 3,244.24 941.34 5,407.06 1,568.90 A‐1 Theater 5,000 s.f. II‐B, III‐A, V‐A 2,703.53 784.45 4,505.88 1,307.42 A‐1 Theater 5,000 s.f. III‐B, IV, V‐B 2,162.82 627.56 3,604.71 1,045.94 A‐1 Theater 10,000 s.f. I‐A, I‐B, II‐A 3,388.42 1,600.28 5,647.37 2,667.14 A‐1 Theater 10,000 s.f. II‐B, III‐A, V‐A 2,823.69 1,333.57 4,706.14 2,222.61 A‐1 Theater 10,000 s.f. III‐B, IV, V‐B 2,258.95 1,066.85 3,764.92 1,778.09 A‐1 Theater 20,000 s.f. I‐A, I‐B, II‐A 3,893.08 2,306.29 6,488.47 3,843.81 A‐1 Theater 20,000 s.f. II‐B, III‐A, V‐A 3,244.24 1,921.91 5,407.06 3,203.18 A‐1 Theater 20,000 s.f. III‐B, IV, V‐B 2,595.39 1,537.52 4,325.65 2,562.54 A‐1 Theater 50,000 s.f. I‐A, I‐B, II‐A 4,974.49 2,776.96 8,290.82 4,628.26 A‐1 Theater 50,000 s.f. II‐B, III‐A, V‐A 4,145.41 2,314.13 6,909.02 3,856.89 A‐1 Theater 50,000 s.f. III‐B, IV, V‐B 3,316.33 1,851.31 5,527.22 3,085.51 A‐1 Theater 100,000 s.f. I‐A, I‐B, II‐A 6,921.04 3,294.70 11,535.06 5,491.16 A‐1 Theater 100,000 s.f. II‐B, III‐A, V‐A 5,767.53 2,745.58 9,612.55 4,575.97 A‐1 Theater 100,000 s.f. III‐B, IV, V‐B 4,614.02 2,196.46 7,690.04 3,660.77 A‐2 Nightclub 1,000 s.f. I‐A, I‐B, II‐A 1,946.54 376.54 3,244.24 627.56 A‐2 Nightclub 1,000 s.f. II‐B, III‐A, V‐A 1,622.12 313.78 2,703.53 522.97 A‐2 Nightclub 1,000 s.f. III‐B, IV, V‐B 1,297.69 251.02 2,162.82 418.37 A‐2 Nightclub 5,000 s.f. I‐A, I‐B, II‐A 3,172.14 800.14 5,286.90 1,333.57 A‐2 Nightclub 5,000 s.f. II‐B, III‐A, V‐A 2,643.45 666.78 4,405.75 1,111.31 A‐2 Nightclub 5,000 s.f. III‐B, IV, V‐B 2,114.76 533.43 3,524.60 889.05 A‐2 Nightclub 10,000 s.f. I‐A, I‐B, II‐A 3,244.24 1,412.01 5,407.06 2,353.35 A‐2 Nightclub 10,000 s.f. II‐B, III‐A, V‐A 2,703.53 1,176.68 4,505.88 1,961.13 A‐2 Nightclub 10,000 s.f. III‐B, IV, V‐B 2,162.82 941.34 3,604.71 1,568.90 A‐2 Nightclub 20,000 s.f. I‐A, I‐B, II‐A 3,893.08 1,976.82 6,488.47 3,294.70 A‐2 Nightclub 20,000 s.f. II‐B, III‐A, V‐A 3,244.24 1,647.35 5,407.06 2,745.58 A‐2 Nightclub 20,000 s.f. III‐B, IV, V‐B 2,595.39 1,317.88 4,325.65 2,196.46 A‐2 Nightclub 50,000 s.f. I‐A, I‐B, II‐A 4,902.40 2,353.35 8,170.67 3,922.26 A‐2 Nightclub 50,000 s.f. II‐B, III‐A, V‐A 4,085.33 1,961.13 6,808.89 3,268.55 A‐2 Nightclub 50,000 s.f. III‐B, IV, V‐B 3,268.27 1,568.90 5,447.11 2,614.84 A‐2 Nightclub 100,000 s.f. I‐A, I‐B, II‐A 6,848.94 3,059.36 11,414.90 5,098.93 A‐2 Nightclub 100,000 s.f. II‐B, III‐A, V‐A 5,707.45 2,549.47 9,512.42 4,249.11 A‐2 Nightclub 100,000 s.f. III‐B, IV, V‐B 4,565.96 2,039.57 7,609.94 3,399.29 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. I‐A, I‐B, II‐A 2,379.11 423.60 3,965.18 706.01 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. II‐B, III‐A, V‐A 1,982.59 353.00 3,304.31 588.34 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. III‐B, IV, V‐B 1,586.07 282.40 2,643.45 470.67 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. I‐A, I‐B, II‐A 3,676.80 847.21 6,128.00 1,412.01 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. II‐B, III‐A, V‐A 3,064.00 706.01 5,106.67 1,176.68 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. III‐B, IV, V‐B 2,451.20 564.81 4,085.33 941.34 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. I‐A, I‐B, II‐A 3,820.99 1,506.15 6,368.31 2,510.24 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. II‐B, III‐A, V‐A 3,184.16 1,255.12 5,306.93 2,091.87 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. III‐B, IV, V‐B 2,547.33 1,004.10 4,245.54 1,673.50 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. I‐A, I‐B, II‐A 4,253.55 2,118.02 7,089.26 3,530.03 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. II‐B, III‐A, V‐A 3,544.63 1,765.02 5,907.71 2,941.69 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. III‐B, IV, V‐B 2,835.70 1,412.01 4,726.17 2,353.35 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. I‐A, I‐B, II‐A 5,118.68 2,541.62 8,531.14 4,236.04 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. II‐B, III‐A, V‐A 4,265.57 2,118.02 7,109.28 3,530.03 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. III‐B, IV, V‐B 3,412.46 1,694.42 5,687.43 2,824.03 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. I‐A, I‐B, II‐A 5,767.53 3,294.70 9,612.55 5,491.16 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. II‐B, III‐A, V‐A 4,806.28 2,745.58 8,010.46 4,575.97 A‐3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. III‐B, IV, V‐B 3,845.02 2,196.46 6,408.37 3,660.77 A‐4 Arena 5,000 s.f. I‐A, I‐B, II‐A 3,676.80 800.14 6,128.00 1,333.57 A‐4 Arena 5,000 s.f. II‐B, III‐A, V‐A 3,064.00 666.78 5,106.67 1,111.31 A‐4 Arena 5,000 s.f. III‐B, IV, V‐B 2,451.20 533.43 4,085.33 889.05 Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
A‐4 Arena 10,000 s.f. I‐A, I‐B, II‐A 3,820.99 1,412.01 6,368.31 2,353.35 A‐4 Arena 10,000 s.f. II‐B, III‐A, V‐A 3,184.16 1,176.68 5,306.93 1,961.13 A‐4 Arena 10,000 s.f. III‐B, IV, V‐B 2,547.33 941.34 4,245.54 1,568.90 A‐4 Arena 20,000 s.f. I‐A, I‐B, II‐A 4,541.93 2,023.88 7,569.88 3,373.14 A‐4 Arena 20,000 s.f. II‐B, III‐A, V‐A 3,784.94 1,686.57 6,308.24 2,810.95 A‐4 Arena 20,000 s.f. III‐B, IV, V‐B 3,027.95 1,349.26 5,046.59 2,248.76 A‐4 Arena 50,000 s.f. I‐A, I‐B, II‐A 5,767.53 2,447.49 9,612.55 4,079.15 A‐4 Arena 50,000 s.f. II‐B, III‐A, V‐A 4,806.28 2,039.57 8,010.46 3,399.29 A‐4 Arena 50,000 s.f. III‐B, IV, V‐B 3,845.02 1,631.66 6,408.37 2,719.43 A‐4 Arena 100,000 s.f. I‐A, I‐B, II‐A 8,002.45 3,237.06 13,337.41 5,395.10 A‐4 Arena 100,000 s.f. II‐B, III‐A, V‐A 6,668.71 2,697.55 11,114.51 4,495.92 A‐4 Arena 100,000 s.f. III‐B, IV, V‐B 5,334.97 2,158.04 8,891.61 3,596.74 A‐5 Stadium 1,000 s.f. I‐A, I‐B, II‐A 1,658.16 423.60 2,763.61 706.01 A‐5 Stadium 1,000 s.f. II‐B, III‐A, V‐A 1,381.80 353.00 2,303.01 588.34 A‐5 Stadium 1,000 s.f. III‐B, IV, V‐B 1,105.44 282.40 1,842.41 470.67 A‐5 Stadium 5,000 s.f. I‐A, I‐B, II‐A 2,523.29 800.14 4,205.49 1,333.57 A‐5 Stadium 5,000 s.f. II‐B, III‐A, V‐A 2,102.75 666.78 3,504.58 1,111.31 A‐5 Stadium 5,000 s.f. III‐B, IV, V‐B 1,682.20 533.43 2,803.66 889.05 A‐5 Stadium 10,000 s.f. I‐A, I‐B, II‐A 2,595.39 1,412.01 4,325.65 2,353.35 A‐5 Stadium 10,000 s.f. II‐B, III‐A, V‐A 2,162.82 1,176.68 3,604.71 1,961.13 A‐5 Stadium 10,000 s.f. III‐B, IV, V‐B 1,730.26 941.34 2,883.77 1,568.90 A‐5 Stadium 20,000 s.f. I‐A, I‐B, II‐A 3,027.95 2,023.88 5,046.59 3,373.14 A‐5 Stadium 20,000 s.f. II‐B, III‐A, V‐A 2,523.29 1,686.57 4,205.49 2,810.95 A‐5 Stadium 20,000 s.f. III‐B, IV, V‐B 2,018.64 1,349.26 3,364.39 2,248.76 A‐5 Stadium 50,000 s.f. I‐A, I‐B, II‐A 3,820.99 2,447.49 6,368.31 4,079.15 A‐5 Stadium 50,000 s.f. II‐B, III‐A, V‐A 3,184.16 2,039.57 5,306.93 3,399.29 A‐5 Stadium 50,000 s.f. III‐B, IV, V‐B 2,547.33 1,631.66 4,245.54 2,719.43 A‐5 Stadium 100,000 s.f. I‐A, I‐B, II‐A 4,325.65 3,200.56 7,209.41 5,334.27 A‐5 Stadium 100,000 s.f. II‐B, III‐A, V‐A 3,604.71 2,667.14 6,007.84 4,445.23 A‐5 Stadium 100,000 s.f. III‐B, IV, V‐B 2,883.77 2,133.71 4,806.28 3,556.18 B Office 1,000 s.f. I‐A, I‐B, II‐A 2,811.67 517.74 4,686.12 862.90 B Office 1,000 s.f. II‐B, III‐A, V‐A 2,343.06 431.45 3,905.10 719.08 B Office 1,000 s.f. III‐B, IV, V‐B 1,874.45 345.16 3,124.08 575.26 B Office 5,000 s.f. I‐A, I‐B, II‐A 4,614.02 1,082.54 7,690.04 1,804.24 B Office 5,000 s.f. II‐B, III‐A, V‐A 3,845.02 902.12 6,408.37 1,503.53 B Office 5,000 s.f. III‐B, IV, V‐B 3,076.02 721.70 5,126.69 1,202.83 B Office 10,000 s.f. I‐A, I‐B, II‐A 4,758.21 1,882.68 7,930.35 3,137.81 B Office 10,000 s.f. II‐B, III‐A, V‐A 3,965.18 1,568.90 6,608.63 2,614.84 B Office 10,000 s.f. III‐B, IV, V‐B 3,172.14 1,255.12 5,286.90 2,091.87 B Office 20,000 s.f. I‐A, I‐B, II‐A 5,695.44 2,682.82 9,492.39 4,471.37 B Office 20,000 s.f. II‐B, III‐A, V‐A 4,746.20 2,235.69 7,910.33 3,726.14 B Office 20,000 s.f. III‐B, IV, V‐B 3,796.96 1,788.55 6,328.26 2,980.92 B Office 50,000 s.f. I‐A, I‐B, II‐A 7,137.32 3,247.63 11,895.53 5,412.72 B Office 50,000 s.f. II‐B, III‐A, V‐A 5,947.77 2,706.36 9,912.94 4,510.60 B Office 50,000 s.f. III‐B, IV, V‐B 4,758.21 2,165.09 7,930.35 3,608.48 B Office 10,000 s.f. I‐A, I‐B, II‐A 8,362.92 4,047.77 13,938.20 6,746.28 B Office 10,000 s.f. II‐B, III‐A, V‐A 6,969.10 3,373.14 11,615.16 5,621.90 B Office 10,000 s.f. III‐B, IV, V‐B 5,575.28 2,698.51 9,292.13 4,497.52 B Office 200,000 s.f. I‐A, I‐B, II‐A 14,779.30 7,248.33 24,632.16 12,080.55 B Office 200,000 s.f. II‐B, III‐A, V‐A 12,316.08 6,040.28 20,526.80 10,067.13 B Office 200,000 s.f. III‐B, IV, V‐B 9,852.86 4,832.22 16,421.44 8,053.70 B Office 500,000 s.f. I‐A, I‐B, II‐A 16,942.12 8,895.68 28,236.87 14,826.13 B Office 500,000 s.f. II‐B, III‐A, V‐A 14,118.43 7,413.07 23,530.72 12,355.11 B Office 500,000 s.f. III‐B, IV, V‐B 11,294.75 5,930.45 18,824.58 9,884.09 B Office 1,000,000 s.f. I‐A, I‐B, II‐A 23,935.25 11,390.24 39,892.08 18,983.73 B Office 1,000,000 s.f. II‐B, III‐A, V‐A 19,946.04 9,491.86 33,243.40 15,819.77 B Office 1,000,000 s.f. III‐B, IV, V‐B 15,956.83 7,593.49 26,594.72 12,655.82
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
B Medical Office 1,000 s.f. I‐A, I‐B, II‐A 2,955.86 517.74 4,926.43 862.90 B Medical Office 1,000 s.f. II‐B, III‐A, V‐A 2,463.22 431.45 4,105.36 719.08 B Medical Office 1,000 s.f. III‐B, IV, V‐B 1,970.57 345.16 3,284.29 575.26 B Medical Office 5,000 s.f. I‐A, I‐B, II‐A 4,758.21 1,082.54 7,930.35 1,804.24 B Medical Office 5,000 s.f. II‐B, III‐A, V‐A 3,965.18 902.12 6,608.63 1,503.53 B Medical Office 5,000 s.f. III‐B, IV, V‐B 3,172.14 721.70 5,286.90 1,202.83 B Medical Office 10,000 s.f. I‐A, I‐B, II‐A 4,902.40 1,882.68 8,170.67 3,137.81 B Medical Office 10,000 s.f. II‐B, III‐A, V‐A 4,085.33 1,568.90 6,808.89 2,614.84 B Medical Office 10,000 s.f. III‐B, IV, V‐B 3,268.27 1,255.12 5,447.11 2,091.87 B Medical Office 20,000 s.f. I‐A, I‐B, II‐A 5,839.62 2,729.89 9,732.71 4,549.82 B Medical Office 20,000 s.f. II‐B, III‐A, V‐A 4,866.35 2,274.91 8,110.59 3,791.52 B Medical Office 20,000 s.f. III‐B, IV, V‐B 3,893.08 1,819.93 6,488.47 3,033.21 B Medical Office 50,000 s.f. I‐A, I‐B, II‐A 7,281.51 3,247.63 12,135.84 5,412.72 B Medical Office 50,000 s.f. II‐B, III‐A, V‐A 6,067.92 2,706.36 10,113.20 4,510.60 B Medical Office 50,000 s.f. III‐B, IV, V‐B 4,854.34 2,165.09 8,090.56 3,608.48 B Medical Office 100,000 s.f. I‐A, I‐B, II‐A 10,381.55 3,906.57 17,302.59 6,510.95 B Medical Office 100,000 s.f. II‐B, III‐A, V‐A 8,651.30 3,255.47 14,418.83 5,425.79 B Medical Office 100,000 s.f. III‐B, IV, V‐B 6,921.04 2,604.38 11,535.06 4,340.63 B Restaurant <50 occupants 1,000 s.f. I‐A, I‐B, II‐A 2,451.20 847.21 4,085.33 1,412.01 B Restaurant <50 occupants 1,000 s.f. II‐B, III‐A, V‐A 2,042.67 706.01 3,404.44 1,176.68 B Restaurant <50 occupants 1,000 s.f. III‐B, IV, V‐B 1,634.13 564.81 2,723.56 941.34 B Restaurant <50 occupants 2,000 s.f. I‐A, I‐B, II‐A 3,027.95 988.41 5,046.59 1,647.35 B Restaurant <50 occupants 2,000 s.f. II‐B, III‐A, V‐A 2,523.29 823.67 4,205.49 1,372.79 B Restaurant <50 occupants 2,000 s.f. III‐B, IV, V‐B 2,018.64 658.94 3,364.39 1,098.23 B Restaurant <50 occupants 5,000 s.f. I‐A, I‐B, II‐A 3,460.52 1,317.88 5,767.53 2,196.46 B Restaurant <50 occupants 5,000 s.f. II‐B, III‐A, V‐A 2,883.77 1,098.23 4,806.28 1,830.39 B Restaurant <50 occupants 5,000 s.f. III‐B, IV, V‐B 2,307.01 878.59 3,845.02 1,464.31 B Restaurant <50 occupants 10,000 s.f. I‐A, I‐B, II‐A 4,109.37 3,153.50 6,848.94 5,255.83 B Restaurant <50 occupants 10,000 s.f. II‐B, III‐A, V‐A 3,424.47 2,627.91 5,707.45 4,379.85 B Restaurant <50 occupants 10,000 s.f. III‐B, IV, V‐B 2,739.58 2,102.33 4,565.96 3,503.88 E Educational 1,000 s.f. I‐A, I‐B, II‐A 2,162.82 376.54 3,604.71 627.56 E Educational 1,000 s.f. II‐B, III‐A, V‐A 1,802.35 313.78 3,003.92 522.97 E Educational 1,000 s.f. III‐B, IV, V‐B 1,441.88 251.02 2,403.14 418.37 E Educational 5,000 s.f. I‐A, I‐B, II‐A 3,244.24 800.14 5,407.06 1,333.57 E Educational 5,000 s.f. II‐B, III‐A, V‐A 2,703.53 666.78 4,505.88 1,111.31 E Educational 5,000 s.f. III‐B, IV, V‐B 2,162.82 533.43 3,604.71 889.05 E Educational 10,000 s.f. I‐A, I‐B, II‐A 3,388.42 1,412.01 5,647.37 2,353.35 E Educational 10,000 s.f. II‐B, III‐A, V‐A 2,823.69 1,176.68 4,706.14 1,961.13 E Educational 10,000 s.f. III‐B, IV, V‐B 2,258.95 941.34 3,764.92 1,568.90 E Educational 20,000 s.f. I‐A, I‐B, II‐A 4,037.27 2,023.88 6,728.79 3,373.14 E Educational 20,000 s.f. II‐B, III‐A, V‐A 3,364.39 1,686.57 5,607.32 2,810.95 E Educational 20,000 s.f. III‐B, IV, V‐B 2,691.51 1,349.26 4,485.86 2,248.76 E Educational 50,000 s.f. I‐A, I‐B, II‐A 5,118.68 2,400.42 8,531.14 4,000.70 E Educational 50,000 s.f. II‐B, III‐A, V‐A 4,265.57 2,000.35 7,109.28 3,333.92 E Educational 50,000 s.f. III‐B, IV, V‐B 3,412.46 1,600.28 5,687.43 2,667.14 E Educational 100,000 s.f. I‐A, I‐B, II‐A 7,137.32 3,106.43 11,895.53 5,177.38 E Educational 100,000 s.f. II‐B, III‐A, V‐A 5,947.77 2,588.69 9,912.94 4,314.48 E Educational 100,000 s.f. III‐B, IV, V‐B 4,758.21 2,070.95 7,930.35 3,451.59 F‐1, F‐2 Industrial, Moderate/Low Hazard 1,000 s.f. I‐A, I‐B, II‐A 1,874.45 376.54 3,124.08 627.56 F‐1, F‐2 Industrial, Moderate/Low Hazard 1,000 s.f. II‐B, III‐A, V‐A 1,562.04 313.78 2,603.40 522.97 F‐1, F‐2 Industrial, Moderate/Low Hazard 1,000 s.f. III‐B, IV, V‐B 1,249.63 251.02 2,082.72 418.37 F‐1, F‐2 Industrial, Moderate/Low Hazard 5,000 s.f. I‐A, I‐B, II‐A 2,811.67 800.14 4,686.12 1,333.57 F‐1, F‐2 Industrial, Moderate/Low Hazard 5,000 s.f. II‐B, III‐A, V‐A 2,343.06 666.78 3,905.10 1,111.31 F‐1, F‐2 Industrial, Moderate/Low Hazard 5,000 s.f. III‐B, IV, V‐B 1,874.45 533.43 3,124.08 889.05 F‐1, F‐2 Industrial, Moderate/Low Hazard 15,000 s.f. I‐A, I‐B, II‐A 2,955.86 1,412.01 4,926.43 2,353.35 F‐1, F‐2 Industrial, Moderate/Low Hazard 15,000 s.f. II‐B, III‐A, V‐A 2,463.22 1,176.68 4,105.36 1,961.13 F‐1, F‐2 Industrial, Moderate/Low Hazard 15,000 s.f. III‐B, IV, V‐B 1,970.57 941.34 3,284.29 1,568.90
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
F‐1, F‐2 Industrial, Moderate/Low Hazard 20,000 s.f. I‐A, I‐B, II‐A 3,460.52 1,741.48 5,767.53 2,902.47 F‐1, F‐2 Industrial, Moderate/Low Hazard 20,000 s.f. II‐B, III‐A, V‐A 2,883.77 1,451.24 4,806.28 2,418.73 F‐1, F‐2 Industrial, Moderate/Low Hazard 20,000 s.f. III‐B, IV, V‐B 2,307.01 1,160.99 3,845.02 1,934.98 F‐1, F‐2 Industrial, Moderate/Low Hazard 50,000 s.f. I‐A, I‐B, II‐A 4,109.37 2,023.88 6,848.94 3,373.14 F‐1, F‐2 Industrial, Moderate/Low Hazard 50,000 s.f. II‐B, III‐A, V‐A 3,424.47 1,686.57 5,707.45 2,810.95 F‐1, F‐2 Industrial, Moderate/Low Hazard 50,000 s.f. III‐B, IV, V‐B 2,739.58 1,349.26 4,565.96 2,248.76 F‐1, F‐2 Industrial, Moderate/Low Hazard 100,000 s.f. I‐A, I‐B, II‐A 4,325.65 2,682.82 7,209.41 4,471.37 F‐1, F‐2 Industrial, Moderate/Low Hazard 100,000 s.f. II‐B, III‐A, V‐A 3,604.71 2,235.69 6,007.84 3,726.14 F‐1, F‐2 Industrial, Moderate/Low Hazard 100,000 s.f. III‐B, IV, V‐B 2,883.77 1,788.55 4,806.28 2,980.92 S‐1, S‐2 Low/Mod Hazard Storage 1,000 s.f. I‐A, I‐B, II‐A 1,441.88 1,176.68 2,403.14 1,961.13 S‐1, S‐2 Low/Mod Hazard Storage 1,000 s.f. II‐B, III‐A, V‐A 1,201.57 980.56 2,002.61 1,634.27 S‐1, S‐2 Low/Mod Hazard Storage 1,000 s.f. III‐B, IV, V‐B 961.26 784.45 1,602.09 1,307.42 S‐1, S‐2 Low/Mod Hazard Storage 5,000 s.f. I‐A, I‐B, II‐A 2,162.82 1,553.21 3,604.71 2,588.69 S‐1, S‐2 Low/Mod Hazard Storage 5,000 s.f. II‐B, III‐A, V‐A 1,802.35 1,294.35 3,003.92 2,157.24 S‐1, S‐2 Low/Mod Hazard Storage 5,000 s.f. III‐B, IV, V‐B 1,441.88 1,035.48 2,403.14 1,725.79 S‐1, S‐2 Low/Mod Hazard Storage 10,000 s.f. I‐A, I‐B, II‐A 2,379.11 1,976.82 3,965.18 3,294.70 S‐1, S‐2 Low/Mod Hazard Storage 10,000 s.f. II‐B, III‐A, V‐A 1,982.59 1,647.35 3,304.31 2,745.58 S‐1, S‐2 Low/Mod Hazard Storage 10,000 s.f. III‐B, IV, V‐B 1,586.07 1,317.88 2,643.45 2,196.46 S‐1, S‐2 Low/Mod Hazard Storage 20,000 s.f. I‐A, I‐B, II‐A 2,595.39 2,588.69 4,325.65 4,314.48 S‐1, S‐2 Low/Mod Hazard Storage 20,000 s.f. II‐B, III‐A, V‐A 2,162.82 2,157.24 3,604.71 3,595.40 S‐1, S‐2 Low/Mod Hazard Storage 20,000 s.f. III‐B, IV, V‐B 1,730.26 1,725.79 2,883.77 2,876.32 S‐1, S‐2 Low/Mod Hazard Storage 50,000 s.f. I‐A, I‐B, II‐A 3,244.24 3,341.76 5,407.06 5,569.61 S‐1, S‐2 Low/Mod Hazard Storage 50,000 s.f. II‐B, III‐A, V‐A 2,703.53 2,784.80 4,505.88 4,641.34 S‐1, S‐2 Low/Mod Hazard Storage 50,000 s.f. III‐B, IV, V‐B 2,162.82 2,227.84 3,604.71 3,713.07 S‐1, S‐2 Low/Mod Hazard Storage 100,000 s.f., II‐B, III‐A, V‐A I‐A, I‐B, II‐A 4,686.12 4,377.24 7,810.20 7,295.40 S‐1, S‐2 Low/Mod Hazard Storage 100,000 s.f., II‐B, III‐A, V‐A II‐B, III‐A, V‐A 3,905.10 3,647.70 6,508.50 6,079.50 S‐1, S‐2 Low/Mod Hazard Storage 100,000 s.f., II‐B, III‐A, V‐A III‐B, IV, V‐B 3,124.08 2,918.16 5,206.80 4,863.60 S‐2 Parking Garage 5,000 s.f. I‐A, I‐B, II‐A 2,307.01 1,412.01 3,845.02 2,353.35 S‐2 Parking Garage 5,000 s.f. II‐B, III‐A, V‐A 1,922.51 1,176.68 3,204.18 1,961.13 S‐2 Parking Garage 5,000 s.f. III‐B, IV, V‐B 1,538.01 941.34 2,563.35 1,568.90 S‐2 Parking Garage 10,000 s.f. I‐A, I‐B, II‐A 3,532.61 1,835.62 5,887.69 3,059.36 S‐2 Parking Garage 10,000 s.f. II‐B, III‐A, V‐A 2,943.84 1,529.68 4,906.41 2,549.47 S‐2 Parking Garage 10,000 s.f. III‐B, IV, V‐B 2,355.07 1,223.74 3,925.12 2,039.57 S‐2 Parking Garage 50,000 s.f. I‐A, I‐B, II‐A 3,676.80 2,400.42 6,128.00 4,000.70 S‐2 Parking Garage 50,000 s.f. II‐B, III‐A, V‐A 3,064.00 2,000.35 5,106.67 3,333.92 S‐2 Parking Garage 50,000 s.f. III‐B, IV, V‐B 2,451.20 1,600.28 4,085.33 2,667.14 S‐2 Parking Garage 100,000 s.f. I‐A, I‐B, II‐A 5,695.44 3,577.10 9,492.39 5,961.83 S‐2 Parking Garage 100,000 s.f. II‐B, III‐A, V‐A 4,746.20 2,980.92 7,910.33 4,968.19 S‐2 Parking Garage 100,000 s.f. III‐B, IV, V‐B 3,796.96 2,384.73 6,328.26 3,974.55 S‐2 Parking Garage 500,000 s.f. I‐A, I‐B, II‐A 6,921.04 5,365.65 11,535.06 8,942.75 S‐2 Parking Garage 500,000 s.f. II‐B, III‐A, V‐A 5,767.53 4,471.37 9,612.55 7,452.29 S‐2 Parking Garage 500,000 s.f. III‐B, IV, V‐B 4,614.02 3,577.10 7,690.04 5,961.83 S‐2 Parking Garage 1,000,000 s.f. I‐A, I‐B, II‐A 10,731.30 15,139.77 9,083.86 17,885.49 S‐2 Parking Garage 1,000,000 s.f. II‐B, III‐A, V‐A 7,569.88 8,942.75 12,616.47 14,904.58 S‐2 Parking Garage 1,000,000 s.f. III‐B, IV, V‐B 6,055.91 7,154.20 10,093.18 11,923.66 U Utility/Misc 500 s.f. I‐A, I‐B, II‐A 720.94 423.60 1,201.57 706.01 U Utility/Misc 500 s.f. II‐B, III‐A, V‐A 600.78 353.00 1,001.31 588.34 U Utility/Misc 500 s.f. III‐B, IV, V‐B 480.63 282.40 801.05 470.67 U Utility/Misc 2,000 s.f. I‐A, I‐B, II‐A 1,081.41 611.87 1,802.35 1,019.79 U Utility/Misc 2,000 s.f. II‐B, III‐A, V‐A 901.18 509.89 1,501.96 849.82 U Utility/Misc 2,000 s.f. III‐B, IV, V‐B 720.94 407.91 1,201.57 679.86 U Utility/Misc 4,000 s.f. I‐A, I‐B, II‐A 1,225.60 1,270.81 2,042.67 2,118.02 U Utility/Misc 4,000 s.f. II‐B, III‐A, V‐A 1,021.33 1,059.01 1,702.22 1,765.02 U Utility/Misc 4,000 s.f. III‐B, IV, V‐B 817.07 847.21 1,361.78 1,412.01 U Utility/Misc 8,000 s.f. I‐A, I‐B, II‐A 1,441.88 1,647.35 2,403.14 2,745.58 U Utility/Misc 8,000 s.f. II‐B, III‐A, V‐A 1,201.57 1,372.79 2,002.61 2,287.98 U Utility/Misc 8,000 s.f. III‐B, IV, V‐B 1, 961.26 098.23 1,602.09 1,830.39
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
U Utility/Misc 20,000 s.f. I‐A, I‐B, II‐A 1,802.35 2,070.95 3,003.92 3,451.59 U Utility/Misc 20,000 s.f. II‐B, III‐A, V‐A 1,501.96 1,725.79 2,503.27 2,876.32 U Utility/Misc 20,000 s.f. III‐B, IV, V‐B 1,201.57 1,380.63 2,002.61 2,301.06 U Utility/Misc 40,000 s.f. I‐A, I‐B, II‐A 2,739.58 2,494.56 4,565.96 4,157.59 U Utility/Misc 40,000 s.f. II‐B, III‐A, V‐A 2,282.98 2,078.80 3,804.97 3,464.66 U Utility/Misc 40,000 s.f. III‐B, IV, V‐B 1,826.38 1,663.04 3,043.97 2,771.73 U Utility/Misc (Associated w R‐3 structures) 500 s.f. I‐A, I‐B, II‐A 288.38 188.27 480.63 313.78 U Utility/Misc (Associated w R‐3 structures) 500 s.f. II‐B, III‐A, V‐A 240.31 156.89 400.52 261.48 U Utility/Misc (Associated w R‐3 structures) 500 s.f. III‐B, IV, V‐B 192.25 125.51 320.42 209.19 U Utility/Misc (Associated w R‐3 structures) 2,000 s.f. I‐A, I‐B, II‐A 432.56 282.40 720.94 470.67 U Utility/Misc (Associated w R‐3 structures) 2,000 s.f. II‐B, III‐A, V‐A 360.47 235.34 600.78 392.23 U Utility/Misc (Associated w R‐3 structures) 2,000 s.f. III‐B, IV, V‐B 288.38 188.27 480.63 313.78 U Utility/Misc (Associated w R‐3 structures) 4,000 s.f. I‐A, I‐B, II‐A 504.66 564.81 841.10 941.34 U Utility/Misc (Associated w R‐3 structures) 4,000 s.f. II‐B, III‐A, V‐A 420.55 470.67 700.92 784.45 U Utility/Misc (Associated w R‐3 structures) 4,000 s.f. III‐B, IV, V‐B 336.44 376.54 560.73 627.56 U Utility/Misc (Associated w R‐3 structures) 8,000 s.f. I‐A, I‐B, II‐A 576.75 753.07 1, 961.26 255.12 U Utility/Misc (Associated w R‐3 structures) 8,000 s.f. II‐B, III‐A, V‐A 480.63 627.56 1, 801.05 045.94 U Utility/Misc (Associated w R‐3 structures) 8,000 s.f. III‐B, IV, V‐B 384.50 502.05 640.84 836.75 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 1,000 s.f. I‐A, I‐B, II‐A 2,162.82 470.67 3,604.71 784.45 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 1,000 s.f. II‐B, III‐A, V‐A 1,802.35 392.23 3,003.92 653.71 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 1,000 s.f. III‐B, IV, V‐B 1,441.88 313.78 2,403.14 522.97 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 5,000 s.f. I‐A, I‐B, II‐A 3,244.24 941.34 5,407.06 1,568.90 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 5,000 s.f. II‐B, III‐A, V‐A 2,703.53 784.45 4,505.88 1,307.42 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 5,000 s.f. III‐B, IV, V‐B 2,162.82 627.56 3,604.71 1,045.94 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 10,000 s.f. I‐A, I‐B, II‐A 3,388.42 1,553.21 5,647.37 2,588.69 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 10,000 s.f. II‐B, III‐A, V‐A 2,823.69 1,294.35 4,706.14 2,157.24 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 10,000 s.f. III‐B, IV, V‐B 2,258.95 1,035.48 3,764.92 1,725.79 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 50,000 s.f. I‐A, I‐B, II‐A 4,974.49 2,729.89 8,290.82 4,549.82 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 50,000 s.f. II‐B, III‐A, V‐A 4,145.41 2,274.91 6,909.02 3,791.52 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 50,000 s.f. III‐B, IV, V‐B 3,316.33 1,819.93 5,527.22 3,033.21 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 100,000 s.f. I‐A, I‐B, II‐A 6,776.85 3,530.03 11,294.75 5,883.39 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 100,000 s.f. II‐B, III‐A, V‐A 5,647.37 2,941.69 9,412.29 4,902.82 H‐1, H‐2, H‐3, H‐4 High Hazards/Explosives 100,000 s.f. III‐B, IV, V‐B 4,517.90 2,353.35 7,529.83 3,922.26 H‐5 HPM, 1,000 s.f. I‐A, I‐B, II‐A 3,172.14 376.54 5,286.90 627.56 H‐5 HPM, 1,000 s.f. II‐B, III‐A, V‐A 2,643.45 313.78 4,405.75 522.97 H‐5 HPM, 1,000 s.f. III‐B, IV, V‐B 2,114.76 251.02 3,524.60 418.37 H‐5 HPM, 5,000 s.f. I‐A, I‐B, II‐A 4,902.40 800.14 8,170.67 1,333.57 H‐5 HPM, 5,000 s.f. II‐B, III‐A, V‐A 4,085.33 666.78 6,808.89 1,111.31 H‐5 HPM, 5,000 s.f. III‐B, IV, V‐B 3,268.27 533.43 5,447.11 889.05 H‐5 HPM, 10,000 s.f. I‐A, I‐B, II‐A 5,118.68 1,364.95 8,531.14 2,274.91 H‐5 HPM, 10,000 s.f. II‐B, III‐A, V‐A 4,265.57 1,137.45 7,109.28 1,895.76 H‐5 HPM, 10,000 s.f. III‐B, IV, V‐B 3,412.46 909.96 5,687.43 1,516.61 H‐5 HPM, 20,000 s.f. I‐A, I‐B, II‐A 6,055.91 1,976.82 10,093.18 3,294.70 H‐5 HPM, 20,000 s.f. II‐B, III‐A, V‐A 5,046.59 1,647.35 8,410.98 2,745.58 H‐5 HPM, 20,000 s.f. III‐B, IV, V‐B 4,037.27 1,317.88 6,728.79 2,196.46 H‐5 HPM, 50,000 s.f. I‐A, I‐B, II‐A 7,569.88 2,353.35 12,616.47 3,922.26 H‐5 HPM, 50,000 s.f. II‐B, III‐A, V‐A 6,308.24 1,961.13 10,513.73 3,268.55 H‐5 HPM, 50,000 s.f. III‐B, IV, V‐B 5,046.59 1,568.90 8,410.98 2,614.84 H‐5 HPM, 100,000 s.f. I‐A, I‐B, II‐A 10,742.02 3,059.36 17,903.37 5,098.93 H‐5 HPM, 100,000 s.f. II‐B, III‐A, V‐A 8,951.69 2,549.47 14,919.48 4,249.11 H‐5 HPM, 100,000 s.f. III‐B, IV, V‐B 7,161.35 2,039.57 11,935.58 3,399.29 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 1,000 s.f. I‐A, I‐B, II‐A 2,955.86 517.74 4,926.43 862.90 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 1,000 s.f. II‐B, III‐A, V‐A 2,463.22 431.45 4,105.36 719.08 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 1,000 s.f. III‐B, IV, V‐B 1,970.57 345.16 3,284.29 575.26 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 5,000 s.f. I‐A, I‐B, II‐A 4,758.21 1,035.48 7,930.35 1,725.79 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 5,000 s.f. II‐B, III‐A, V‐A 3,965.18 862.90 6,608.63 1,438.16 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 5,000 s.f. III‐B, IV, V‐B 3,172.14 690.32 5,286.90 1,150.53
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
I‐1, I‐2, I‐3 Institutional, Hospital, Jail 10,000 s.f. I‐A, I‐B, II‐A 4,902.40 1,835.62 8,170.67 3,059.36 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 10,000 s.f. II‐B, III‐A, V‐A 4,085.33 1,529.68 6,808.89 2,549.47 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 10,000 s.f. III‐B, IV, V‐B 3,268.27 1,223.74 5,447.11 2,039.57 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 20,000 s.f. I‐A, I‐B, II‐A 5,839.62 2,588.69 9,732.71 4,314.48 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 20,000 s.f. II‐B, III‐A, V‐A 4,866.35 2,157.24 8,110.59 3,595.40 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 20,000 s.f. III‐B, IV, V‐B 3,893.08 1,725.79 6,488.47 2,876.32 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 50,000 s.f. I‐A, I‐B, II‐A 7,281.51 3,106.43 12,135.84 5,177.38 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 50,000 s.f. II‐B, III‐A, V‐A 6,067.92 2,588.69 10,113.20 4,314.48 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 50,000 s.f. III‐B, IV, V‐B 4,854.34 2,070.95 8,090.56 3,451.59 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 100,000 s.f. I‐A, I‐B, II‐A 10,381.55 4,000.70 17,302.59 6,667.84 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 100,000 s.f. II‐B, III‐A, V‐A 8,651.30 3,333.92 14,418.83 5,556.53 I‐1, I‐2, I‐3 Institutional, Hospital, Jail 100,000 s.f. III‐B, IV, V‐B 6,921.04 2,667.14 11,535.06 4,445.23 I‐4, I‐2.1 Day Care/Outpatient 1,000 s.f. I‐A, I‐B, II‐A 2,955.86 470.67 4,926.43 784.45 I‐4, I‐2.1 Day Care/Outpatient 1,000 s.f. II‐B, III‐A, V‐A 2,463.22 392.23 4,105.36 653.71 I‐4, I‐2.1 Day Care/Outpatient 1,000 s.f. III‐B, IV, V‐B 1,970.57 313.78 3,284.29 522.97 I‐4, I‐2.1 Day Care/Outpatient 5,000 s.f. I‐A, I‐B, II‐A 4,686.12 988.41 7,810.20 1,647.35 I‐4, I‐2.1 Day Care/Outpatient 5,000 s.f. II‐B, III‐A, V‐A 3,905.10 823.67 6,508.50 1,372.79 I‐4, I‐2.1 Day Care/Outpatient 5,000 s.f. III‐B, IV, V‐B 3,124.08 658.94 5,206.80 1,098.23 I‐4, I‐2.1 Day Care/Outpatient 10,000 s.f. I‐A, I‐B, II‐A 4,902.40 1,694.42 8,170.67 2,824.03 I‐4, I‐2.1 Day Care/Outpatient 10,000 s.f. II‐B, III‐A, V‐A 4,085.33 1,412.01 6,808.89 2,353.35 I‐4, I‐2.1 Day Care/Outpatient 10,000 s.f. III‐B, IV, V‐B 3,268.27 1,129.61 5,447.11 1,882.68 I‐4, I‐2.1 Day Care/Outpatient 20,000 s.f. I‐A, I‐B, II‐A 5,839.62 2,447.49 9,732.71 4,079.15 I‐4, I‐2.1 Day Care/Outpatient 20,000 s.f. II‐B, III‐A, V‐A 4,866.35 2,039.57 8,110.59 3,399.29 I‐4, I‐2.1 Day Care/Outpatient 20,000 s.f. III‐B, IV, V‐B 3,893.08 1,631.66 6,488.47 2,719.43 I‐4, I‐2.1 Day Care/Outpatient 50,000 s.f. I‐A, I‐B, II‐A 7,281.51 2,918.16 12,135.84 4,863.60 I‐4, I‐2.1 Day Care/Outpatient 50,000 s.f. II‐B, III‐A, V‐A 6,067.92 2,431.80 10,113.20 4,053.00 I‐4, I‐2.1 Day Care/Outpatient 50,000 s.f. III‐B, IV, V‐B 4,854.34 1,945.44 8,090.56 3,242.40 I‐4, I‐2.1 Day Care/Outpatient 100,000 s.f. I‐A, I‐B, II‐A 10,381.55 3,530.03 17,302.59 5,883.39 I‐4, I‐2.1 Day Care/Outpatient 100,000 s.f. II‐B, III‐A, V‐A 8,651.30 2,941.69 14,418.83 4,902.82 I‐4, I‐2.1 Day Care/Outpatient 100,000 s.f. III‐B, IV, V‐B 6,921.04 2,353.35 11,535.06 3,922.26 M Mercantile 1,000 s.f. I‐A, I‐B, II‐A 2,018.64 800.14 3,364.39 1,333.57 M Mercantile 1,000 s.f. II‐B, III‐A, V‐A 1,682.20 666.78 2,803.66 1,111.31 M Mercantile 1,000 s.f. III‐B, IV, V‐B 1,345.76 533.43 2,242.93 889.05 M Mercantile 5,000 s.f. I‐A, I‐B, II‐A 3,100.05 1,223.74 5,166.75 2,039.57 M Mercantile 5,000 s.f. II‐B, III‐A, V‐A 2,583.37 1,019.79 4,305.62 1,699.64 M Mercantile 5,000 s.f. III‐B, IV, V‐B 2,066.70 815.83 3,444.50 1,359.72 M Mercantile 10,000 s.f. I‐A, I‐B, II‐A 3,244.24 1,835.62 5,407.06 3,059.36 M Mercantile 10,000 s.f. II‐B, III‐A, V‐A 2,703.53 1,529.68 4,505.88 2,549.47 M Mercantile 10,000 s.f. III‐B, IV, V‐B 2,162.82 1,223.74 3,604.71 2,039.57 M Mercantile 20,000 s.f. I‐A, I‐B, II‐A 3,820.99 2,776.96 6,368.31 4,628.26 M Mercantile 20,000 s.f. II‐B, III‐A, V‐A 3,184.16 2,314.13 5,306.93 3,856.89 M Mercantile 20,000 s.f. III‐B, IV, V‐B 2,547.33 1,851.31 4,245.54 3,085.51 M Mercantile 50,000 s.f. I‐A, I‐B, II‐A 4,758.21 3,577.10 7,930.35 5,961.83 M Mercantile 50,000 s.f. II‐B, III‐A, V‐A 3,965.18 2,980.92 6,608.63 4,968.19 M Mercantile 50,000 s.f. III‐B, IV, V‐B 3,172.14 2,384.73 5,286.90 3,974.55 M Mercantile 100,000 s.f. I‐A, I‐B, II‐A 5,407.06 4,612.57 9,011.77 7,687.62 M Mercantile 100,000 s.f. II‐B, III‐A, V‐A 4,505.88 3,843.81 7,509.80 6,406.35 M Mercantile 100,000 s.f. III‐B, IV, V‐B 3,604.71 3,075.05 6,007.84 5,125.08 M Mercantile 200,000 s.f. I‐A, I‐B, II‐A 6,055.91 6,071.65 10,093.18 10,119.42 M Mercantile 200,000 s.f. II‐B, III‐A, V‐A 5,046.59 5,059.71 8,410.98 8,432.85 M Mercantile 200,000 s.f. III‐B, IV, V‐B 4,037.27 4,047.77 6,728.79 6,746.28 R‐1 Apartments/Hotel Transient 1,000 s.f. I‐A, I‐B, II‐A 2,523.29 894.27 4,205.49 1,490.46 R‐1 Apartments/Hotel Transient 1,000 s.f. II‐B, III‐A, V‐A 2,102.75 745.23 3,504.58 1,242.05 R‐1 Apartments/Hotel Transient 1,000 s.f. III‐B, IV, V‐B 1,682.20 596.18 2,803.66 993.64 R‐1 Apartments/Hotel Transient 5,000 s.f. I‐A, I‐B, II‐A 3,893.08 1,694.42 6,488.47 2,824.03 R‐1 Apartments/Hotel Transient 5,000 s.f. II‐B, III‐A, V‐A 3,244.24 1,412.01 5,407.06 2,353.35 R‐1 Apartments/Hotel Transient 5,000 s.f. III‐B, IV, V‐B 2,595.39 1,129.61 4,325.65 1,882.68
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
R‐1 Apartments/Hotel Transient 10,000 s.f. I‐A, I‐B, II‐A 4,037.27 2,824.03 6,728.79 4,706.71 R‐1 Apartments/Hotel Transient 10,000 s.f. II‐B, III‐A, V‐A 3,364.39 2,353.35 5,607.32 3,922.26 R‐1 Apartments/Hotel Transient 10,000 s.f. III‐B, IV, V‐B 2,691.51 1,882.68 4,485.86 3,137.81 R‐1 Apartments/Hotel Transient 20,000 s.f. I‐A, I‐B, II‐A 4,758.21 3,953.64 7,930.35 6,589.39 R‐1 Apartments/Hotel Transient 20,000 s.f. II‐B, III‐A, V‐A 3,965.18 3,294.70 6,608.63 5,491.16 R‐1 Apartments/Hotel Transient 20,000 s.f. III‐B, IV, V‐B 3,172.14 2,635.76 5,286.90 4,392.93 R‐1 Apartments/Hotel Transient 50,000 s.f. I‐A, I‐B, II‐A 5,983.81 4,753.78 9,973.02 7,922.96 R‐1 Apartments/Hotel Transient 50,000 s.f. II‐B, III‐A, V‐A 4,986.51 3,961.48 8,310.85 6,602.47 R‐1 Apartments/Hotel Transient 50,000 s.f. III‐B, IV, V‐B 3,989.21 3,169.18 6,648.68 5,281.97 R‐1 Apartments/Hotel Transient 100,000 s.f. I‐A, I‐B, II‐A 8,435.01 6,118.72 14,058.35 10,197.87 R‐1 Apartments/Hotel Transient 100,000 s.f. II‐B, III‐A, V‐A 7,029.18 5,098.93 11,715.30 8,498.22 R‐1 Apartments/Hotel Transient 100,000 s.f. III‐B, IV, V‐B 5,623.34 4,079.15 9,372.24 6,798.58 R‐2 Multi‐Family Residential Apartment ‐ Perm 1,000 s.f. I‐A, I‐B, II‐A 2,523.29 847.21 4,205.49 1,412.01 R‐2 Multi‐Family Residential Apartment ‐ Perm 1,000 s.f. II‐B, III‐A, V‐A 2,102.75 706.01 3,504.58 1,176.68 R‐2 Multi‐Family Residential Apartment ‐ Perm 1,000 s.f. III‐B, IV, V‐B 1,682.20 564.81 2,803.66 941.34 R‐2 Multi‐Family Residential Apartment ‐ Perm 5,000 s.f. I‐A, I‐B, II‐A 3,604.71 1,600.28 6,007.84 2,667.14 R‐2 Multi‐Family Residential Apartment ‐ Perm 5,000 s.f. II‐B, III‐A, V‐A 3,003.92 1,333.57 5,006.54 2,222.61 R‐2 Multi‐Family Residential Apartment ‐ Perm 5,000 s.f. III‐B, IV, V‐B 2,403.14 1,066.85 4,005.23 1,778.09 R‐2 Multi‐Family Residential Apartment ‐ Perm 10,000 s.f. I‐A, I‐B, II‐A 3,676.80 2,824.03 6,128.00 4,706.71 R‐2 Multi‐Family Residential Apartment ‐ Perm 10,000 s.f. II‐B, III‐A, V‐A 3,064.00 2,353.35 5,106.67 3,922.26 R‐2 Multi‐Family Residential Apartment ‐ Perm 10,000 s.f. III‐B, IV, V‐B 2,451.20 1,882.68 4,085.33 3,137.81 R‐2 Multi‐Family Residential Apartment ‐ Perm 20,000 s.f. I‐A, I‐B, II‐A 4,325.65 3,435.90 7,209.41 5,726.50 R‐2 Multi‐Family Residential Apartment ‐ Perm 20,000 s.f. II‐B, III‐A, V‐A 3,604.71 2,863.25 6,007.84 4,772.08 R‐2 Multi‐Family Residential Apartment ‐ Perm 20,000 s.f. III‐B, IV, V‐B 2,883.77 2,290.60 4,806.28 3,817.66 R‐2 Multi‐Family Residential Apartment ‐ Perm 50,000 s.f. I‐A, I‐B, II‐A 5,334.97 4,188.97 8,891.61 6,981.62 R‐2 Multi‐Family Residential Apartment ‐ Perm 50,000 s.f. II‐B, III‐A, V‐A 4,445.80 3,490.81 7,409.67 5,818.02 R‐2 Multi‐Family Residential Apartment ‐ Perm 50,000 s.f. III‐B, IV, V‐B 3,556.64 2,792.65 5,927.74 4,654.41 R‐2 Multi‐Family Residential Apartment ‐ Perm 100,000 s.f. I‐A, I‐B, II‐A 7,281.51 5,271.51 12,135.84 8,785.86 R‐2 Multi‐Family Residential Apartment ‐ Perm 100,000 s.f. II‐B, III‐A, V‐A 6,067.92 4,392.93 10,113.20 7,321.55 R‐2 Multi‐Family Residential Apartment ‐ Perm 100,000 s.f. III‐B, IV, V‐B 4,854.34 3,514.34 8,090.56 5,857.24 R‐2.1 Residential Care/Assist Living Facility 1,000 s.f. I‐A, I‐B, II‐A 3,027.95 1,176.68 5,046.59 1,961.13 R‐2.1 Residential Care/Assist Living Facility 1,000 s.f. II‐B, III‐A, V‐A 2,523.29 980.56 4,205.49 1,634.27 R‐2.1 Residential Care/Assist Living Facility 1,000 s.f. III‐B, IV, V‐B 2,018.64 784.45 3,364.39 1,307.42 R‐2.1 Residential Care/Assist Living Facility 5,000 s.f. I‐A, I‐B, II‐A 4,325.65 1,506.15 7,209.41 2,510.24 R‐2.1 Residential Care/Assist Living Facility 5,000 s.f. II‐B, III‐A, V‐A 3,604.71 1,255.12 6,007.84 2,091.87 R‐2.1 Residential Care/Assist Living Facility 5,000 s.f. III‐B, IV, V‐B 2,883.77 1,004.10 4,806.28 1,673.50 R‐2.1 Residential Care/Assist Living Facility 10,000 s.f. I‐A, I‐B, II‐A 4,469.84 1,976.82 7,449.73 3,294.70 R‐2.1 Residential Care/Assist Living Facility 10,000 s.f. II‐B, III‐A, V‐A 3,724.86 1,647.35 6,208.11 2,745.58 R‐2.1 Residential Care/Assist Living Facility 10,000 s.f. III‐B, IV, V‐B 2,979.89 1,317.88 4,966.48 2,196.46 R‐2.1 Residential Care/Assist Living Facility 20,000 s.f. I‐A, I‐B, II‐A 5,334.97 2,541.62 8,891.61 4,236.04 R‐2.1 Residential Care/Assist Living Facility 20,000 s.f. II‐B, III‐A, V‐A 4,445.80 2,118.02 7,409.67 3,530.03 R‐2.1 Residential Care/Assist Living Facility 20,000 s.f. III‐B, IV, V‐B 3,556.64 1,694.42 5,927.74 2,824.03 R‐2.1 Residential Care/Assist Living Facility 50,000 s.f. I‐A, I‐B, II‐A 6,488.47 3,341.76 10,814.12 5,569.61 R‐2.1 Residential Care/Assist Living Facility 50,000 s.f. II‐B, III‐A, V‐A 5,407.06 2,784.80 9,011.77 4,641.34 R‐2.1 Residential Care/Assist Living Facility 50,000 s.f. III‐B, IV, V‐B 4,325.65 2,227.84 7,209.41 3,713.07 R‐2.1 Residential Care/Assist Living Facility 100,000 s.f. I‐A, I‐B, II‐A 8,867.58 4,330.17 14,779.30 7,216.95 R‐2.1 Residential Care/Assist Living Facility 100,000 s.f. II‐B, III‐A, V‐A 7,389.65 3,608.48 12,316.08 6,014.13 R‐2.1 Residential Care/Assist Living Facility 100,000 s.f. III‐B, IV, V‐B 5,911.72 2,886.78 9,852.86 4,811.30 R‐3 Single Family Residential 2,000 s.f. I‐A, I‐B, II‐A 1,009.32 329.47 1,682.20 549.12 R‐3 Single Family Residential 2,000 s.f. II‐B, III‐A, V‐A 841.10 274.56 1,401.83 457.60 R‐3 Single Family Residential 2,000 s.f. III‐B, IV, V‐B 672.88 219.65 1,121.46 366.08 R‐3 Single Family Residential 3,000 s.f. I‐A, I‐B, II‐A 1,297.69 376.54 2,162.82 627.56 R‐3 Single Family Residential 3,000 s.f. II‐B, III‐A, V‐A 1,081.41 313.78 1,802.35 522.97 R‐3 Single Family Residential 3,000 s.f. III‐B, IV, V‐B 865.13 251.02 1,441.88 418.37 R‐3 Single Family Residential 5,000 s.f. I‐A, I‐B, II‐A 1,874.45 517.74 3,124.08 862.90 R‐3 Single Family Residential 5,000 s.f. II‐B, III‐A, V‐A 1,562.04 431.45 2,603.40 719.08 R‐3 Single Family Residential 5,000 s.f. III‐B, IV, V‐B 1,249.63 345.16 2,082.72 575.26
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
R‐3 Single Family Residential 10,000 s.f. I‐A, I‐B, II‐A 2,090.73 706.01 3,484.55 1,176.68 R‐3 Single Family Residential 10,000 s.f. II‐B, III‐A, V‐A 1,742.27 588.34 2,903.79 980.56 R‐3 Single Family Residential 10,000 s.f. III‐B, IV, V‐B 1,393.82 470.67 2,323.03 784.45 R‐3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. I‐A, I‐B, II‐A 3,027.95 658.94 5,046.59 1,098.23 R‐3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. II‐B, III‐A, V‐A 2,523.29 549.12 4,205.49 915.19 R‐3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. III‐B, IV, V‐B 2,018.64 439.29 3,364.39 732.15 R‐3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. I‐A, I‐B, II‐A 4,325.65 1,035.48 7,209.41 1,725.79 R‐3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. II‐B, III‐A, V‐A 3,604.71 862.90 6,007.84 1,438.16 R‐3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. III‐B, IV, V‐B 2,883.77 690.32 4,806.28 1,150.53 R‐3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. I‐A, I‐B, II‐A 4,469.84 1,412.01 7,449.73 2,353.35 R‐3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. II‐B, III‐A, V‐A 3,724.86 1,176.68 6,208.11 1,961.13 R‐3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. III‐B, IV, V‐B 2,979.89 941.34 4,966.48 1,568.90 R‐3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. I‐A, I‐B, II‐A 5,334.97 1,976.82 8,891.61 3,294.70 R‐3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. II‐B, III‐A, V‐A 4,445.80 1,647.35 7,409.67 2,745.58 R‐3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. III‐B, IV, V‐B 3,556.64 1,317.88 5,927.74 2,196.46 R‐3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. I‐A, I‐B, II‐A 6,488.47 2,353.35 10,814.12 3,922.26 R‐3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. II‐B, III‐A, V‐A 5,407.06 1,961.13 9,011.77 3,268.55 R‐3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. III‐B, IV, V‐B 4,325.65 1,568.90 7,209.41 2,614.84 R‐3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. I‐A, I‐B, II‐A 8,867.58 3,059.36 14,779.30 5,098.93 R‐3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. II‐B, III‐A, V‐A 7,389.65 2,549.47 12,316.08 4,249.11 R‐3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. III‐B, IV, V‐B 5,911.72 2,039.57 9,852.86 3,399.29 R‐4 Residential Care/Assisted Living Facility 1,000 s.f. I‐A, I‐B, II‐A 3,027.95 470.67 5,046.59 784.45 R‐4 Residential Care/Assisted Living Facility 1,000 s.f. II‐B, III‐A, V‐A 2,523.29 392.23 4,205.49 653.71 R‐4 Residential Care/Assisted Living Facility 1,000 s.f. III‐B, IV, V‐B 2,018.64 313.78 3,364.39 522.97 R‐4 Residential Care/Assisted Living Facility 5,000 s.f. I‐A, I‐B, II‐A 4,325.65 847.21 7,209.41 1,412.01 R‐4 Residential Care/Assisted Living Facility 5,000 s.f. II‐B, III‐A, V‐A 3,604.71 706.01 6,007.84 1,176.68 R‐4 Residential Care/Assisted Living Facility 5,000 s.f. III‐B, IV, V‐B 2,883.77 564.81 4,806.28 941.34 R‐4 Residential Care/Assisted Living Facility 10,000 s.f. I‐A, I‐B, II‐A 4,469.84 1,412.01 7,449.73 2,353.35 R‐4 Residential Care/Assisted Living Facility 10,000 s.f. II‐B, III‐A, V‐A 3,724.86 1,176.68 6,208.11 1,961.13 R‐4 Residential Care/Assisted Living Facility 10,000 s.f. III‐B, IV, V‐B 2,979.89 941.34 4,966.48 1,568.90 R‐4 Residential Care/Assisted Living Facility 20,000 s.f. I‐A, I‐B, II‐A 5,334.97 1,835.62 8,891.61 3,059.36 R‐4 Residential Care/Assisted Living Facility 20,000 s.f. II‐B, III‐A, V‐A 4,445.80 1,529.68 7,409.67 2,549.47 R‐4 Residential Care/Assisted Living Facility 20,000 s.f. III‐B, IV, V‐B 3,556.64 1,223.74 5,927.74 2,039.57 R‐4 Residential Care/Assisted Living Facility 50,000 s.f. I‐A, I‐B, II‐A 6,488.47 2,212.15 10,814.12 3,686.92 R‐4 Residential Care/Assisted Living Facility 50,000 s.f. II‐B, III‐A, V‐A 5,407.06 1,843.46 9,011.77 3,072.44 R‐4 Residential Care/Assisted Living Facility 50,000 s.f. III‐B, IV, V‐B 4,325.65 1,474.77 7,209.41 2,457.95 R‐4 Residential Care/Assisted Living Facility 100,000 s.f. I‐A, I‐B, II‐A 8,867.58 2,824.03 14,779.30 4,706.71 R‐4 Residential Care/Assisted Living Facility 100,000 s.f. II‐B, III‐A, V‐A 7,389.65 2,353.35 12,316.08 3,922.26 R‐4 Residential Care/Assisted Living Facility 100,000 s.f. III‐B, IV, V‐B 5,911.72 1,882.68 9,852.86 3,137.81 U Detached Access. Structure 2,000 s.f. I‐A, I‐B, II‐A 1,153.51 611.87 1,922.51 1,019.79 U Detached Access. Structure 2,000 s.f. II‐B, III‐A, V‐A 961.26 509.89 1,602.09 849.82 U Detached Access. Structure 2,000 s.f. III‐B, IV, V‐B 769.00 407.91 1,281.67 679.86 U Detached Access. Structure 3,000 s.f. I‐A, I‐B, II‐A 1,441.88 658.94 2,403.14 1,098.23 U Detached Access. Structure 3,000 s.f. II‐B, III‐A, V‐A 1,201.57 549.12 2,002.61 915.19 U Detached Access. Structure 3,000 s.f. III‐B, IV, V‐B 961.26 439.29 1,602.09 732.15 U Detached Access. Structure 5,000 s.f. I‐A, I‐B, II‐A 2,090.73 988.41 3,484.55 1,647.35 U Detached Access. Structure 5,000 s.f. II‐B, III‐A, V‐A 1,742.27 823.67 2,903.79 1,372.79 U Detached Access. Structure 5,000 s.f. III‐B, IV, V‐B 1,393.82 658.94 2,323.03 1,098.23 U Detached Access. Structure 10,000 s.f. I‐A, I‐B, II‐A 2,307.01 1,317.88 3,845.02 2,196.46 U Detached Access. Structure 10,000 s.f. II‐B, III‐A, V‐A 1,922.51 1,098.23 3,204.18 1,830.39 U Detached Access. Structure 10,000 s.f. III‐B, IV, V‐B 1,538.01 878.59 2,563.35 1,464.31 Footnotes:
1. 30% is for non‐structural review as determined by the Building Official.
2. 50% is for structural review as determined by the Building Official.
BUILDING DIVISION ‐ Table F: Tenant Improvements
Service Name
Non‐Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
Current Fee Current Fee
Plan Check Only
(with PME
included) Inspection Only
Plan Check Only
(with PME
included) Inspection Only
30%
50%
CITY OF CORONA
Non Structural Structural
MASTER FEE RECOVERY SCHEDULE
NON‐MARKET BASED FEES
3. Minor rounding differences may occur as the actual permits are based on a percentage of Table A.
4. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged based on current billable hourly rates for City of Corona reviews and actual hourly contracted rates for consultant reviews.
5. Where plans are incomplete or changed so as to require additional plan checks, an additional plan check fee shall be charged at the rate established by the fee schedule and minimum hours as determined by the Building Official.